﻿Fiscal Year 1987
'-' 
4 . - 
rr 
i- scalSYear188 
(1 Octobe 19 - 30 Septembe1 9 
S A S 
S S.- 0 -. - 6 
0uI 
S

FY 1987 STATISTICAL HIGHLIGHTS 
ITEM 
APPROPRIATIONS ($ Millions) 
Navigation ........................................... 
Flood Control Total .................................... 
Flood Control 
Mississippi River and Tributaries' ................... ... 
Multipurpose including power ................ .......... 
Beach Erosion Control .................................. 
Total New W ork� ...................................... 
Other W ork' .......................................... 
T O T A L ............................................. 
NAVIGATION (Calandar Year)* 
Ton-Miles of Commerce (Millions) 
Foreign, Coastal Ports ................................. 
Foreign, Great Lakes Ports .............................. 
Domestic, Coastal (Intraterritory not compiled) ............. 
Domestic, Great Lakes ................................. 
Domestic, Inland ...................................... 
Dome sticL,o cal ....................................... 
T O T A L ............................................. 
Tons of Commerce (Millions) 
Foreign Coastal Ports .................................. 
Foreign Great Lakes Ports .............................. 
Domestic, Coastal and Intraterritory ...................... 
Domestic, Great Lakes ................................. 
Dom estic, Inland ...................................... 
Dom estic, Local ....................................... 
T O T A L ............................................. 
FLOOD DAMAGES PREVENTED ($ Billions) .............. . 
FLOOD DAMAGES SUSTAINED ($ Billions) ................ 
POWER 
Inatalled (Cumulative in millions of kw) ................... . 
Generated (Billions of kwh) ............................... 
RESERVOIR STORAGE (Millions of acre-feet) 
All Purposes ........................................... 
Flood Control (Maximum) ................................ 
W ater Supply ........................................... 
Irrigation .............................................. 
PUBLIC ATTENDANCE AT RESERVOIRS 
(Billions of vistior hours, calendar years) ................... . 
1987 1986 1985 1984 1983 1982 1981 1980 1979 1978 
443 299 
787 673 
304 257 577 552 607 485 395 357 
676 647 832 774 772 873 802 895 
(206) (227) (225) (203) (291) (177) 
69 93 112 171 221 247 
23 17 12 25 5 7 
1,322 1,082 1,104 1,127 1,685 1,580 
1,813 1,658 1,797 1,561 1,734 1,417 
3,135 2,740 2,901 2;688 3,419 2,997 
(211) (158) (188) 
538 358 155 
9 12 12 
1,905 1,567 1,719 
1,296 1,233 1,070 
3,201 2,790 2,789 
47,274.2 44,769.3 46,509.0 45,287.0 51,262.7 58,929.2 60,569.8 59,940.5 58,925.6 
24,235.2 27,171.9 32,249.3 24,309.4 27,165.5 35,294.0 33,679.6 43,146.4 42,108.8 
580,888.7 10,976.5 593,923.0 649,749.4 632,707.1 634,765.3 631,149.2 532,290.2 540,373.2 
43,198.2 48,183.9 49,784.4 43,088.1 35,623.3 62,148.4 61,749.1 77,971.9 76,284.0 
248,116.9 232,707.5 242.855.4 225,628.2 217,026.7 231,184.1 227,343.0 217,090.2 209,266.2 
1,192.2 1,102.0 1,157.1 1,099.6 1,111.7 1,315.6 1,596.4 1,710.2 1,339.8 
944,910.4 964,911.1 966,478.2 989,161.7 964,897.0 1,023,636.5 1,016,085.1 931,846.4 928,297.6 
791.4 723.0 744.5 702.7 769.2 823.9 860.8 919.7 875.5 
45.7 51.3 58.7 48.4 50.4 62.3 60.6 73.8 70.6 
312.0 313.2 311.1 312.8 312.9 322.0 333.2 308.7 308.6 
87.4 92.0 98.0 83.5 72.1 115.4 115.2 143.6 142.7 
560.5 534.7 542.5 487.1 495.5 520.7 535.0 535.0 534.5 
77.4 74.2 81.1 73.1 75.6 93.2 94.2 93.1 89.5 
1,874.4 1,788.4 1,835.9 1,707.6 1,776.7 1,938.4 1,999.0 2,073.9 2,021.4 
5.2 27.3 10.8 16.8 23.2 4.3 1.2 7.3 19.4 6.3 
1.5 6.0 .5 4.0 2.1 1.0 1.8 3.6 1.1 1.5 
20.5 20.5 20.1' 20.1' 19.7' 19.7' 
74.0 80.7 88.3 91.2 88.2 75.8 
273.6 273.6 272.1 270.6 269.0 
123.3 123.3 123.0 123.0 123.0 
9.5 9.5 9.2 9.2 9.2 
7.8 7.8 7.8 7.8 7.8 
506 502 482 480 480 
19.2' 19.0' 19.0' 17.9 
77.3 77.8 81.2 83.6 
268.5 263.3 263.3 262.9 
122.7 120.4 120.4 120.1 
9.1 8.9 7.8 7.7 
7.8 7.8 7.8 7.8 
469 457 449 439 
FUNDING 
General Investigation .................................... 136,287 128,972 
Consruction (General) ................................... 1,152,150 919,345 
Operations Maintenance General .......................... 1,389,846 1,319,973 
Flood Control, MIssissippi River & Tributary ................ 310,797 314,760 
General Expense ........................................ 115,000 107,000 
Flood Control & Coastal Emergencies ...................... 10,000 25,000 
Revolving Fund......................................... 12,000 7,000 
Permanent Appropriations ................... ............ ',000 8,000 
TOTAL ............................................. 3,135,080 2,830,050 
1,784,1992.0 
'Included in Flood Control Total. 
'Advance engineering and design, and construction. (Including major rehabilitation projects.) 
Savings and slippage applied to projects. 
'Operation and maintenance, surveys, administration and misc. programs and activities. 
'Includes New Melones and Spettisham, built by the Corps and operated by others. 
*For further information on waterborne commerce, see Warterborne Commerce of the United 
States, published annually. It may be obtained by writing the District Engineer, U.S. Army 
Engineer District, New Orleans, P.O. Box 60267, New Orleans, Louisiana 70160. (Note: 1986 
navigation figures were not available as of press time, and will be included in the FY 1987 
Annual Report on Civil Works Activities.)

DEPARTMENT OF THE ARMY 
.OFFICE OF THE ASSISTANT SECRETARY $ 
WASHINGTON, DC 20310 0 
NOV 3 0 1988 
TO : THE PRESIDENT OF THE SENATE 
AND THE SPEAKER OF THE HOUSE OF REPRESENTATIVES 
SUBJECT: Annual Report of the Secretary of the Army on 
Civil Works Activities for FY 1987 
I am submitting Volume II of the Annual Report on Civil 
Works Activities for the Fiscal Year 1987 in accordance with 
Section 8 of the Rivers and Harbors Act of 1888 and Section 
925(b) of the Water Resources Development Act of 1986. 
This volume of field reports contains narrative summaries 
and statistics on water resources development projects of the 
Army Corps of Engineers where there has been activity between 
October 1986 and September 1987. 
Robert W. Page 
Assistant Secretary of the Army 
(Civil Works) 
HECSA Technmlal Libra~

CONTENTS 
Page 
NEW ENGLAND DIVISION ............... ....................................................... 1-1 
NORTH ATLANTIC DIVISION: 
New York, NY, District .......................................................................... 2-1 
Philadelphia, PA, District ........................................................................ 3-1 
Baltimore, MD, District ......................................................................... 4-1 
Norfolk, VA, District.................................................................................. 5-1 
SOUTH ATLANTIC DIVISION: 
Wilmington, NC, District ................................................................. ....... 6-1 
Charleston, SC, District ........................................................................... 7-1 
Savannah, GA, District ........................................................................... 8-1 
Jacksonville, FL, District ................................................................ ....... 9-1 
M obile, AL, District ......................................................... ......... 10-12.......... 
LOWER MISSISSIPPI VALLEY DIVISION: 
New Orleans, LA, District........................................................................ 11-1 
Vicksburg, MS, District ........................................................................ 12-1 
Memphis, TN, District .......................................................................... 13-1 
St. Louis, MO, District ............................................................................ 14-1 
SOUTHWESTERN DIVISION: 
Galveston, TX, District ........................................................................... 15-1 
Fort Worth, TX, District.......................................................................... 16-1 
Albuquerque, NM, District ....................................................................... 17-1 
Little Rock, AR, District......................................................................... 18-1 
Tulsa, OK, District................................................................................ 19-1 
MISSOURI RIVER DIVISION: 
Kansas City, MO, District ........................................................................ 20-1 
Omaha, NE, District .............................................................................. 21-1 
OHIO RIVER DIVISION: 
Ohio River........................................................................................ 22-1 
Nashville, TN, District ........................................................................... 23-1 
Louisville, KY, District......................................................................... 24-1 
Huntington, W V, District......................................................................... 25-1 
Pittsburgh, PA, District .......................................................................... 26-1 
NORTH CENTRAL DIVISION: 
St. Paul, M N , District............................................................................ 27-1 
Rock Island, IL, District.......................................................................... 28-1 
Mississippi River between Missouri River and Minneapolis, MN .................................... 29-1 
Chicago, IL, District.............................................................................. 30-1 
Detroit, M I, District.............................................................................. 31-1 
Buffalo, NY, District ............................................................................. 32-1 
SOUTH PACIFIC DIVISION: 
Los Angeles, CA, District......................................................................... 33-1 
San Francisco, CA, District....................................................................... 34-1 
Sacramento, CA, District ......................................................................... 35-1 
PACIFIC OCEAN DIVISION:....................................................................... 36-1

NORTH PACIFIC DIVISION: 
Portland, OR, District.......................................................................... 37-1 
Seattle, W A, District........................................................................... 38-1 
W alla W alla, W A , D istrict........................................................................ 39-1 
A laska D istrict ............................................... .................................. 40-1 
Board of Engineers for Rivers and Harbors .......................................................... 41-1 
M ississippi River Comm ission....................................................................... 42-1 
Natural Disaster Preparedness, Response & Recovery Activities........................................ 43-1 
California Debris Commission ...................................................................... 44-1 
W aterways Experiment Station ..................................................................... 45-1 
Permanent International Association of Navigation Congresses ...................................... 46-1 
Investigations of Projects Under Federal Power Actrc o...................................................... 47-1 
Regulatory Sunken Vessel Removal and National Emergency Preparedness ........................... 48-1 
International Boundary W aters Boards.............................................................. 49-1 
Construction Engineering Research Laboratory ...................................................... 50-1 
Engineer Topographic Laboratories ................................................................. 51-1 
Cold Regions Research Engineering Laboratory...................................................... 52-1 
W ater Resources Support Center.................................................................... 53-1 
APPENDICES: 
Flood Control Reservoirs Operable September 30, 1987............................................. A-1 
Flood Control Projects Under Construction During Fiscal Year 1987 .................................. B-1 
Navigation Locks and Dams Operable September 30, 1987.......................................... C-1 
Navigation Projects Under Construction September 30, 1987........................................ D-1 
Multipurpose Projects Including Power In Operation September 30, 1987 ............................ E-1 
Multipurpose Projects Including Power Under Construction September 30, 1987..................... F-1 
Flood Damages Prevented (By Region and by District) During Fiscal Year 1987..................... G-1 
IN D E X ..................... ......... ........................................... I-1

NEW ENGLAND DIVISION* 
The New England Division, an operating division with 
both district and division functions, comprises all of New 
England except western Vermont and small portions of 
Massachusetts and Connecticut along their western 
boundaries, and includes small portions of southeastern 
New York, all embraced in the drainage basins tributary 
to Long Island Sound and the Atlantic Ocean east of the 
New York-Connecticut State line. It also includes Fishers 
Island, NY. 
IMPROVEMENTS 
Navigation Page 
1. Aquatic Plant Control ...................... 1-3 
2. Black Rock Harbor, CT .................... 1-3 
3. Bristol Harbor, Bristol, RI ................. 1-3 
4. Cape Cod Canal, MA ....................... 1-3 
5. Chatham (Stage)Harbor, MA ............... 1-4 
6. Connecticut River Below 
Hartford, CT ............................... 1-4 
7. Cuttyhunk Harbor, MA .................... 1-5 
8. Green Harbor, MA ......................... 1-5 
9. Hampton Harbor, NH ...................... 1-5 
10. Harbor of Refuge, Block Island, RI .......... 1-6 
11. Hyannis Harbor, MA ....................... 1-6 
12. Jonesport Harbor, ME ..................... 1-6 
13. Kennebec River, ME ....................... 1-7 
14. Milford Harbor, CT ........................ 1-7 
15. New Haven Harbor, CT .................... 1-7 
16. Newburyport Harbor, MA ................. 1-8 
17. Plymouth Harbor, MA ..................... 1-8 
18. Point Judith Pond and Harbor 
of Refuge, Point Judith, RI ................. 1-9 
19. Portsmouth Harbor and 
Piscataqua River, ME and NH ............. 1-9 
20. Rockport Harbor, ME ..................... 1-10 
21. Rockport Harbor and Pigeon 
Cove, Rockport, MA ....................... 1-10 
22. Rye Harbor, NH .......................... 1-11 
23. Sesuit Harbor, MA ........................ 1-11 
24. Reconnaissance and condition 
surveys ................................... 1-11 
25. Other authorized navigation 
projects ................................... 1-11 
26. Navigation activities pursuant to 
Section 107, Public Law 86-645 
(Preauthorization) ......................... 1-11 
27. Authorized bridge alteration ............... 1-11 
Beach Erosion Control 
28. Revere Beach, MA ........................ 1-11 
29. Inspection of completed beach 
erosion control projects .................... 1-12 
30. 
31. 
Page 
Other authorized beach erosion 
control projects ............................ 1-12 
Beach erosion control activities 
pursuant to Section 103, Public 
Law 87-874 (Preauthorization) .............. 1-12 
Flood Control 
32. 
33. 
33A. 
33B. 
34. 
35. 
35A. 
35B. 
35C. 
35D. 
35E. 
35F. 
35G. 
35H. 
35I. 
35J. 
35K. 
35L. 
35M. 
35N. 
350. 
35P. 
35Q. 
35R. 
35S. 
36. 
37. 
37A. 
37B. 
Big River Reservoir, RI ................... 1-12 
Blackstone River Basin, MA and RI ......... 1-12 
Clear River, Burrillville, RI ............... 1-13 
West Hill Dam, MA ....................... 1-13 
Charles River (Natural Valley 
Storage Areas), MA ....................... 1-13 
Connecticut River Basin, VT, 
NH, MA and CT .......................... 1-13 
Ball Mountain Lake, VT .................. 1-14 
Barre Falls Dam, MA ..................... 1-14 
Beaver Brook, Keene, NH ................. 1-14 
Birch Hill Dam, MA ...................... 1-15 
Colebrook River Lake, CT ................. 1-15 
Conant Brook Dam, MA ................... 1-15 
Knightville Dam, MA ..................... 1-15 
Littleville Lake, MA ...................... 1-15 
Mill Brook, Brownsville, VT ............... 1-15 
North Hartland Lake, VT ................. 1-16 
North Springfield Lake, VT ................ 1-16 
Otter Brook Lake, NH .................... 1-16 
Riverdale, West Springfield, MA ........... 1-16 
South River, Conway, MA ................. 1-17 
Surry Mountain Lake, NH ................ 1-17 
Townshend Lake, VT ....................... 1-17 
Tully Lake, MA ........................... 1-17 
Union Village Dam, VT ................... 1-18 
West Springfield, MA ..................... 1-18 
Gulf Street, Milford, CT ................... 1-18 
Housatonic River Basin, CT and MA ........ 1-18 
Black Rock Lake, CT ...................... 1-19 
Covered Bridge, Housatonic 
River, Sheffield, MA ...................... 1-19 
1-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Page 
37C. Hancock Brook Lake, CT .................. 1-19 
37D. Hop Brook Lake, CT ...................... 1-19 
37E. Northfield Brook Lake, CT ................ 1-19 
37F. Thomaston Dam, CT ...................... 1-19 
38. Machias River, Machias, ME ............... 1-20 
39. Marginal Way, Oqunquit, ME .............. 1-20 
40. Merrimack River Basin, NH and MA ....... 1-20 
40A. Blackwater Dam, NH ..................... 1-20 
40B. Edward MacDowell Lake, NH ............. 1-21 
40C. Franklin Falls Dam, NH .................. 1-21 
40D. Hopkinton-Everett Lakes, NH ............. 1-21 
41. New Bedford, Fairhaven, and 
Acushnet, M A ............................. 1-21 
42. New London, CT .......................... 1-21 
43. Pleasant Point, Perry, ME ................ 1-22 
44. Roughans Point, Revere, MA ............... 1-22 
45. Saint John River Basin, ME ............... 1-22 
46. Stamford, CT ............................. 1-22 
47. Thames River Basin, CT, RI 
and M A ................................... 1-23 
47A. Buffumville Lake, MA .................... 1-23 
47B. East Brimfield Lake, MA ................. 1-23 
47C. Hodges Village Dam, MA ................. 1-23 
47D. Mansfield Hollow Lake, CT ................ 1-23 
47E. West Thompson Lake, CT ................. 1-24 
47F. Westville Lake, MA ....................... 1-24 
48. Town Brook, Quincy and 
Braintree, MA ............................ 1-24 
49. Inspection of completed flood 
control projects ............................ 1-24 
50. Flood control reservoir 
operations ................................. 1-25 
51. Hurricane barrier operations .............. 1-26 
52. Other authorized flood 
control projects ............................ 1-26 
53. Flood control work under 
special authorization ...................... 1-26 
54. Deauthorized projects ..................... 1-27 
General Investigations 
55. Surveys ................................... 1-27 
56. Collection and Study of Basic Data ......... 1-27 
57. 
58. 
Continuation of Planning 
and Engineering .......................... 1-28 
Advance Engineering and Design .......... 1-28 
Tables 
Table 1-A Cost & Financial 
Statement .......................... 1-30 
Table 1-B Authorizing Legislation .............. 1-39 
Table 1-C Other Authorized 
Navigation Projects .................. 1-45 
Table 1-D Other Authorized Beach 
Erosion Control Projects .............. 1-49 
Table 1-E Other Authorized 
Flood Control Projects ................ 1-50 
Table 1-F Other Authorized Multiple- 
Purpose Projects including Power ...... 1-51 
Table 1-G Deauthorized Projects ................ 1-52 
Table 1-H' Navigation Activities 
Pursuant to Sec. 107 .................. 1-54 
Table 1-I Beach Erosion Activities 
Pursuant to Sec. 103 .................. 1-54 
Table 1-J Flood Control Activities 
Pursuant to Sec. 205 .................. 1-55 
Table 1-K Blackstone River Basin ............... 1-55 
Table 1-L Connecticut River Basin ............... 1-56 
Table 1-M Housatonic River Basin ............... 1-57 
Table 1-N Merrimack River Basin ............... 1-59 
Table 1-0 Thames River Basin .................. 1-60 
Table 1-P Boston Harbor, MA ................... 1-60 
Table 1-Q Reconnaissance and 
Condition Surveys .................... 1-61 
1-2 
Page

NEW ENGLAND DIVISION 
1. AQUATIC PLANT CONTROL 
Location. The program is conducted in all navigable 
waters, tributary streams, connecting channels and associated 
waters under the New England Division jurisdiction. 
Existing project. The purpose of the program is to provide 
technical assistance in the eradication or control of 
aquatic plants that are causing or have the potential to 
cause major economic problems in the above waterways. 
The plant control is done in the interest of navigation, 
flood control, drainage, agriculture, fish and wildlife conservation, 
public health and research. The program is 
administered by the Chief of Engineers, under the direction 
of the Secretary of the Army, and in cooperation with 
other Federal and State agencies. (See Table 1-B at end 
of chapter for Acts authorizing existing program). 
Local cooperation. Local interests must contribute 50 
percent of the cost of controlling the aquatic plants, and 
in addition must hold the United States free from damages 
that may occur from control operations. 
Operations during fiscal year. On request, technical 
information was provided to local interests on specific 
aquatic weed problems. Information was also provided to 
the Waterways Experiment Station on the degree of the 
problems in the Division, as well as the existence and status 
of State laws pertaining to the regulation of problem 
aquatic plants. We continue to work closely with the States. 
2. BLACK ROCK HARBOR, CT 
Location. On north shore of Long Island, about 51 miles 
east of New York City. (See National Ocean Survey Chart 
12369). 
Existing project. Black Rock Harbor and Cedar Creek 
Channel, 18 feet deep and 100 to 200 feet wide from the 
18-foot contour in Black Rock Harbor to the heads of both 
branches of Cedar Creek, about 2.4 miles. (See Table 1-B 
at end of chapter for Act authorizing existing project). 
Local cooperation. Fully complied with. 
Terminal facilities. There are 6 waterfront facilities 
serving Black Rock Harbor. Facilities are adequate for 
existing commerce. 
Operations during fiscal year. Maintenance: Field 
Verification Program (FVP) studies continued. The FVP 
is monitoring the impact of disposal of contaminated material 
from the harbor on open water, a wetland area, and 
an upland site. In conjunction with the FVP, $23,000 was 
expended to extend existing lease for the upland and 
wetland sites. 
3. BRISTOL HARBOR, BRISTOL, RI 
Location. Bristol Harbor is on the east side of upper 
Narragansett Bay, in Bristol County, about 13 miles 
southeast of Providence, Rhode Island. (See National 
Ocean Survey Charts 13224, 13221 and 13218). 
Existing project. The project provides for an offshore 
breakwater 1,600 feet long located about 400 feet west of 
the Coast Guard pier and extending generally in a northwesterly 
direction. Construction has not begun. Revised 
plan developed during advance engineering and design 
recommends an A-frame type breakwater 1,250 feet long. 
Total estimated cost (June 1986) of the modified plan is 
$4,600,000 of which $1,996,000 is non-Federal cost. (See 
Table 1-B at end of chapter for Act authorizing existing 
project). 
Local cooperation. Local interests are required to provide, 
without cost to the United States, all lands, easements 
and rights-of-way necessary for construction; hold 
and save the United States free from damages due to 
construction and subsequent maintenance of the project 
and provide a cash contribution currently estimated at 50 
percent of project cost based on project benefits. 
Terminal facilities. The developed waterfront of 
Bristol Harbor is concentrated along a half-mile stretch 
of east shore of harbor. In this section, there are six privately 
owned landings, two owned by the town, one by the 
State, and one by the Federal government. All private 
landings are of granite construction and have truck 
access. Two have gasoline and one has diesel oil service; 
and are used primarily for landing shellfish. Town and 
State piers are open to public, and include facilities for 
about 50 small boats and finger piers for larger craft. 
Operations during fiscal year. New work: As a result 
of economic update studies conducted as a part of the 
preparation of the General Design Memorandum, which 
showed insufficient benefits to warrant project implementation 
at this time, the project was placed in the 
"inactive" category as of February 6, 1987. 
4. CAPE COD CANAL, MA 
Location. This waterway is a sea level canal; extending 
from head of Buzzards Bay, MA, to a point on Cape Cod 
Bay about 15 miles southeast of Plymouth Harbor, MA. 
In general direction canal trends from Buzzards Bay 
easterly to Cape Cod Bay. (See National Ocean Survey 
Chart 13246). 
Existing project. For description of existing project 
see Annual Report for 1975. (See Table 1-B at end of 
chapter for Acts authorizing existing project). Navigational 
improvements were completed in April 1963, 
with completion of East Boat Basin extension. Initial 
recreational development consists of public use facilities 
at various locations, which were completed in February 
1965. Improvements to public use facilities at the East 
Boat Basin were completed in May 1974. Construction of 
public use facilities at Bourne Scenic Park were completed 
in May 1976. Canal is crossed by two high-level 
highway bridges and a vertical-lift railroad bridge. 
Initial major rehabilitation of Bourne Highway Bridge 
was completed in December 1965. Minor rehabilitation of 
stone breakwater was completed in October 1963. 
Local cooperation. Fully complied with. Local 
interests must also bear 50 percent of future recreational 
development in accordance with 1965 Federal Water 
Project Recreation Act. 
Terminal facilities. There are seven terminals on the 
canal, of which three are privately owned. Four are used 
for receipt and freezing of fish and two are used for 
receipt and storage of oil. Seventh terminal is State pier, 
1-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
owned by Commonwealth of Massachusetts, and on north 
bank of canal at Bourne Neck. Terminals are adequate 
for purposes for which they are used. 
Operations during fiscal year. Maintenance: A continuing 
contract, awarded last fiscal year, for the 
installation of suspension cables and other repair work on 
the Bourne and Sagamore Bridges was completed in July 
1987 with $1,467,100 expended this fiscal year. A contract 
for the consolidated shop building was awarded in 
September 1986 and was 88 percent complete ending the 
fiscal year. Contract payments of $682,100 were made in 
fiscal year 1987. $595,167 was expended for maintenance 
dredging of isolated shoals in the canal, with the work 
being performed in October 1986 by the Governmentowned 
hopper dredge MC FARLAND. Approximately 
177,000 cubic yards of material was removed and disposed 
of at the Cleveland Ledge disposal site in Buzzards 
Bay. A contract for architectural engineering to prepare 
plans and specifications for rehabilitation on the railroad 
bridge in the amount of $48,000 was awarded and completed 
in fiscal year 1987. Other fiscal year 1987 costs 
for work accomplished by hired labor and contract were: 
resource management facilities $50,000; replacement 
parts for computerized electronic traffic control system 
$47,800; replacement of project maintenance equipment 
$73,900; engineering and design $230,400; supervision 
and administration of contracts $165,300; operation and 
maintenance of railroad bridge, tower and signal system 
$91,500; vessel traffic control activities $1,077,600; operation 
of recreation areas $358,700; supervision and administration 
by Division Office $79,000; real estate activities 
$97,300 and operating costs for roads, bridges and project 
facilities $682,200. 
5. CHATHAM (STAGE) HARBOR, MA 
Location. At northeastern corner of Nantucket Sound, 
about 16 miles east of Hyannis Harbor, MA and 66 miles 
south of Providence Harbor, RI at northern extremity of 
Cape Cod. (See National Ocean Survey Chart 13237). 
Previous project. For details see Annual Report for 
1942. 
Existing project. An entrance channel 10 feet deep and 
150 feet wide from Chatham Roads into upper harbor. (See 
Table 1-B at end of chapter for Acts authorizing existing 
project). Construction of existing project was initiated in 
September and completed in October 1957. By 1961, a 
break in barrier beach connecting Morris and Monomoy 
Islands caused Federal Channel to fill in completely. Local 
interests dredged an emergency channel to obtain 8-foot 
depth in June 1962 and performed additional dredging in 
1963. Minimal maintenance dredging by the Federal 
Government in April and May 1964 provided access to 
inner harbor for 1964 boating season. A new 10-foot 
channel through Harding Beach to Morris Island was 
completed in July 1965. 
Local cooperation. Fully complied with. 
Terminal facilities. The town operates a wharf on the 
north side of the inner harbor which is leased out to commercial 
users. Facilities are adequate for existing 
commerce. 
Operations during fiscal year. Maintenance: A contract 
for maintenance dredging of the entrance channel 
was awarded in March 1987 and completed in June 1987 
with disposal on a portion of Harding Beach west of the 
channel. A total of 117,000 cubic yards of material was 
removed at a cost of $616,000. Hired labor costs of $74,213 
were incurred for preparation of plans and specifications, 
an environmental assessment, supervision and inspection, 
plotting and surveys. 
6. CONNECTICUT RIVER BELOW 
HARTFORD, CT 
Location. Has its source in Connecticut Lake in northern 
New Hampshire, flows southerly 380 miles and 
empties into Long Island Sound at Saybrook, CT, 14 miles 
west of New London. Hartford, now head of commercial 
navigation, is 52 statute miles, by channel, from mouth. 
(See National Ocean Survey Charts 12373 and 12377). 
Previous project. For details see Annual Reports for 
1915 and 1938. 
Eightmile River, CT, elimination as separate project: 
Provides for a channel 8 feet deep and 75 feet wide from 
deep water in Connecticut River to Hamburg and for 
turning basin of same depth, 150 feet wide, approximately 
300 feet long at Hamburg. Project was adopted by 
River and Harbor Act of 1910. Costs and expenditures 
were $9,000 all for new work. In accordance with River 
and Harbor Act of 1950, project for Connecticut River 
below Hartford was modified to include project for 
Eightmile River. Aforementioned Act also provided for 
an anchorage basin 6 feet deep and about 6.5 acres in area 
in upper cove in Hamburg. A channel 15 feet deep and 
150 feet wide for a distance of 52 miles upstream to 
Hartford; two riprap jetties at the mouth of the river; and 
dikes, training walls, revetments and other regulatory 
works along the river between Hartford and Gildersleeve 
Island. The project provides for small-boat improvements 
at Wethersfield Cove; Eightmile River; Essex; and North 
Cove, Old Saybrook. For a more detailed description of 
project see page 7 of Annual Report for 1974. (See Table 
1-B at end of chapter for Acts authorizing existing project). 
Existing project was completed in September 1965 
with the construction of channel and anchorage in North 
Cove, Old Saybrook, CT. For further details, see Annual 
Report for 1974. 
Local cooperation. Fully complied with. 
Terminal facilities. Along both Connecticut and 
Eightmile Rivers there are two or three wharves at each 
river town, one or more in each town being open to public 
use. At Hartford and Middletown there is about one-half 
of wharf frontage along west bank of river. Facilities are 
adequate for existing commerce. 
Operations during fiscal year. Maintenance: Scheduled 
major maintenance dredging was deferred due to 
relatively minor shoaling despite significant spring floods. 
Dredging of isolated shoals in Calves Island, Brockway, 
Glastonbury 2 Piers and Pistol Point Bars was accomplished 
in July 1987 by the Government-owned hopper 
dredge CURRITUCK, at a rental cost of $93,986. 
1-4

NEW ENGLAND DIVISION 
Additional charges were pending at the end of the fiscal 
year. Charges of $3,965 were incurred for the leasing of 
electronic positioning equipment. Approximately 57,000 
cubic yards of material was removed and placed in riverine 
disposal sites, returning the project to adequate navigable 
depth. Hired labor costs of $57,729 were incurred for preparation 
of plans and specifications, environmental assessment, 
supervision and inspection and surveys. In addition, 
$25,658 was expended for a report completed previously 
by the National Marine Fisheries Service on Shortnose 
Sturgeon research in the river. Work under a contract 
awarded last fiscal year for maintenance dredging of the 
entrance to Wethersfield Cove was completed in November 
1986. Approximately 200 cubic yards of material was 
removed and disposed of in the river downstream from the 
entrance. Contract payments this fiscal year were $10,600 
for a total lump sum contract cost of $14,600. 
7. CUTTYHUNK HARBOR, MA 
Location. At eastern end of Cuttyhunk Island, at western 
entrance to Buzzards Bay, about 14 miles south of New 
Bedford Harbor, MA. (See National Ocean Survey Chart 
13229). 
Existing project. A channel generally 75 feet wide and 
10 feet deep from outer harbor to westerly terminal in 
Cuttyhunk Pond, about 3,500 feet; an anchorage in inner 
harbor 10 feet deep, 900 feet long, and 800 feet wide; and 
maintenance of existing jetties and stone dikes. Existing 
project was completed in 1939. (See Table 1-B at end of 
chapter for Acts authorizing existing project). 
Local cooperation. Fully complied with. Disposal areas 
for maintenance will be furnished when required. 
Terminal facilities. Two town wharves of timber and 
pile construction, having total berthing space of 400 feet, 
are open to public use. Limited mechanical-handling 
facilities are available. Facilities are adequate for existing 
commerce. 
Operations during fiscal year. Maintenance: An emergency 
maintenance dredging contract for the entrance 
channel was awarded in May 1987. The lump sum contract 
of $54,160 was completed in June 1987. Approximately 
8,500 cubic yards of material was removed by hydraulic 
dredge and used to nourish the beach south of the entrance 
channel. Hired labor costs of $26,840 were incurred for 
preparation of plans and specifications, supervision and 
inspections, surveys and plotting. 
8. GREEN HARBOR, MA 
Location. On west side of Massachusetts Bay within 
the town of Marshfield about 30 miles southeast of Boston 
and 9 miles north of Plymouth Harbor. (See National 
Ocean Survey Chart 13253) 
Existing project. Provides for channel 6 feet deep (8 
feet at entrance), 100 feet wide extending about 4,000 feet 
from deep water to head of navigation with small turning 
basin at upstream limit; 5-acre anchorage near Town 
Pier, 6 feet deep; sealing, rebuilding in part, and a 200 
foot extension of existing west jetty at elevation +12, with 
dike to beach berm at elevation +14 feet, and raising east 
jetty to elevation +14. (See Table 1-B at end of chapter for 
Act authorizing existing project). Construction was completed 
in October 1969. 
Local cooperation. Fully complied with. 
Terminal facilities. Major terminal facility is Town 
Pier in village of Brant Rock. Facility is a bulkheaded, 
earth-filled landing and parking area about 290 feet wide, 
extending 210 feet into harbor. A marina service is south 
of Town Pier; and a facility for recreational craft has been 
developed on south side of harbor near head of navigation. 
Operations during fiscal year. Maintenance: A contract 
in the amount of $234,000 was awarded in February 
1987 for maintenance dredging of the entrance channel. 
A total of 27,000 cubic yards of material was removed at 
a cost of $157,950. Disposal was in open water off Green 
Harbor Beach. The contractor left the work site in June 
1987; surveys later revealed significant remaining shoals. 
Dredging was resumed in July but was halted due to environmental 
concerns. Work remained incomplete through 
the end of the fiscal year while surveys and probings were 
being performed and evaluated. Hired labor costs of 
$65,590 were incurred for an environmental assessment, 
preparation of plans and specifications, supervision and 
inspection, surveys and plotting. Additional hired labor 
costs of $24,714 were incurred for analysis of alternatives 
and preparation of a report on entrance modification by 
the Waterways Experiment Station. 
9. HAMPTON HARBOR, NH 
Location. On New Hampshire seacoast 13 miles south 
of Portsmouth Harbor, 5 miles north of mouth of Merrimack 
River at Newburyport, MA. (See National Ocean 
Survey Chart 13278). 
Existing project. Extending north jetty 1,000 feet, raising 
outer 300 feet of south jetty and constructing a 180-foot 
spur to high ground, and dredging to provide a channel 8 
feet deep and 150 feet wide across entrance bar. (See Table 
1-B at end of chapter for Act authorizing existing project). 
Project was completed in November 1965. 
Local cooperation. Fully complied with. 
Terminal facilities. There are seven piers in Hampton 
Harbor. State of New Hampshire maintains three pile and 
timber piers, two in Hampton about 1,500 feet north of 
entrance and one in Seabrook one-half mile south of entrance. 
Hampton pier has a 6-foot walkway to a float that 
has depths of 4 to 6 feet. Seabrook pier has a float and a 
water depth of about 3 feet at outer end. One landing is 
open to the public. Facilities are adequate for exsisting 
commerce. 
Operations during fiscal year. Maintenance: A contract 
for maintenance dredging of the 8-foot channel was 
awarded in June 1987 and completed in September 1987. 
A total of 21,389 cubic yards of material was removed at 
a cost of $256,240. Disposal was in open water off the north 
end of Hampton Beach. Hired labor costs of $51,737 were 
incurred for preparation of plans and specifications, 
environmental assessment, supervision and inspection 
and surveys. 
1-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
10. HARBOR OF REFUGE, BLOCK 
ISLAND, RI 
Location. On east side of Block Island, near south end 
of inner curve of shoreline 13 miles south-southwest from 
Point Judith Harbor and about 25 miles southeasterly 
from Stonington Harbor, CT. (See National Ocean Survey 
Chart 13217). 
Existing project. For description of existing project, 
see Annual Report for 1976. (See Table 1-B at end of 
chapter for Acts authorizing existing project). Completed 
in 1916 except for inactive portion. 
Local cooperation. None required. 
Terminal facilities. Two wharves in harbor, both steel 
sheetpile bulkhead which comprises southern and eastern 
limits of basin. Total docking space amounts to 500 feet. 
No mechanical-handling facilities are available. One wharf 
owned by town and open to public, is considered inadequate 
for present general needs of boating in harbor. There is 
limited room for expansion of terminal facilities. 
Operations during fiscal year. Maintenance: An emergency 
dredging contract for the entrance channel was 
awarded in May 1987 and completed in June 1987. Approximately 
16,200 cubic yards of material was removed by 
hydraulic dredge and deposited on Crescent Beach. Total 
lump sum contract was $150,000. Hired labor costs of 
$15,200 were incurred for supervision and inspection, 
preparation of plans and specifications, plotting, and 
surveys. 
11. HYANNIS HARBOR, MA 
Location. On south shore of Cape Cod about 16 miles 
west of Chatham, Massachusetts and 20 miles northeast 
of Vineyard Haven, Massachusetts. (See National Ocean 
Survey Chart 13237). 
Existing project. A stone breakwater 1,170 feet long, 
lying about 0. 7 mile off shore, dredging to 15.5 feet deep 
in protected area behind brealkwater; a channel 12 feet 
deep with widths of 150 and 100 feet in outer and inner 
harbors respectively, an anchorage area 12 feet deep and 
about 5 acres in area adjacent to inner harbor channel 
north of Harbor Bluff; and a riprap jetty 1,000 feet long 
extending south from Dunbar Point. Mean spring tidal 
ranges in outer harbor 3.1 and 3.7 feet, respectively. 
Breakwater was completed in 1882 and dredging behind 
breakwater in 1906. Rehabilitation was necessary to restore 
breakwater to its designed purpose of providing a 
harbor of refuge. Restoration was completed in November 
1961. Construction of 12-foot channel and anchorage was 
initiated in May and completed in November 1959. 
Commonwealth of Massachusetts constructed the jetty extending 
south from Dunbar Point in 1962. (See Table 1-B 
at end of chapter for Acts authorizing existing project). 
Local cooperation. Fully complied with. 
Terminal facilities. There are two town wharves in the 
inner harbor. One has a bulkhead frontage of about 800 
feet. Other private landings are available. Facilities are 
adequate for existing commerce. 
Operations during fiscal year. Maintenance: The 
fiscal year 1985 maintenance dredging contract had not 
been closed out at the end of the fiscal year pending 
resolution of claims. Hired labor costs of $6,490 were 
incurred for supervision and inspection associated with 
the contract claim. 
12. JONESPORT HARBOR, ME 
Location. Jonesport Harbor is situated on the north 
side of Moosabec Reach in Washington County, Maine 
about 190 miles northeast of Portland, Maine, and about 
40 miles southwest of the Canadian border at Eastport, 
Maine. 
Existing project. Provides for a combined rubble 
mound and cellular steel sheet pile breakwater, 1,200 feet 
in length; a 15-acre anchorage composed of 9 acres, 6 feet 
deep, and 6 acres, 8 feet deep; and an entrance channel 
100 feet wide and 8 feet deep. Latest approved cost estimate 
(September 1987) is $9,000,000. (See Table 1-B at 
end of chapter for Act authorizing existing project). 
Local cooperation. Consistent with the cost sharing 
and financing concepts contained in the Water Resources 
Development Act of 1986 (Public Law 99-662), local interests 
are required to provide without cost to the United 
States, all lands, easements, and rights-of-way required 
for construction and subsequent maintenance of the 
project and for aids to navigation upon the request of the 
Chief of Engineers, including suitable areas determined 
by the Chief of Engineers to be required in the general 
public interest for initial and subsequent disposal of spoil, 
and also necessary retaining dikes, bulkheads, and 
embankments therefor or the costs of such retaining 
works; hold and save the United States free from damages 
that may result from the construction and maintenance of 
the project; provide, maintain, and operate necessary 
mooring facilities and utilities including a public landing 
in Sawyer Cove with berthing depths alongside the landing 
commensurate with the depth provided in the entrance 
channel and including an adequate access road, parking 
area, and suitable related facilities open to all on equal 
terms, including transients; accomplish without cost to the 
United States such utility or other relocations or alterations 
as necessary for project purposes; reserve spaces 
within the harbor adequate for the accommodation of 
transient craft; regulate the use, growth, and free development 
of the harbor facilities with the understanding 
that said facilities will be open to all on equal terms, 
including transients; establish regulations prohibiting 
discharge of pollutants into the waters of Jonesport Harbor 
by users thereof, which regulations shall be in accordance 
with applicable laws or regulations of Federal, 
State, and local authorities responsible for pollution prevention 
and control; pay 10 percent of project cost during 
construction; and pay an additional 10 percent of project 
costs within a period of 30 years following completion. 
Terminal facilities. There are thirteen privately 
owned wharves in the harbor, twelve of which are used 
by local fishermen and one which is used for receiving 
about three million gallons of petroleum annually. 
Operations during fiscal year. New work: Local 
interests obtained financing as required under the Local 
Cooperation Agreement. Construction bids were received 
1-6

NEW ENGLAND DIVISION 
in July and a contract in the amount of $7,175,726 for 
construction of the project was awarded on September 4, 
1987. Work had not started at fiscal year end. 
13. KENNEBEC RIVER, ME 
Location. Drains a large number of lakes and minor 
streams, and flows from Moosehead Lake about 150 miles 
southerly and discharges into Atlantic Ocean about 25 
miles east of Portland. (See National Ocean Survey Chart 
13298). 
Previous projects. For details see Annual Reports for 
1915 and 1938. 
Existing project. A channel 27 feet deep and not less 
than 500 feet wide, extending from mouth to bridge at 
Bath; thence to Gardiner a channel not less than 150 feet 
wide, 17 feet deep at Beef Rock Shoal, at foot of Swan 
Island, 18 feet deep through rock at Lovejoy Narrows, 
near head of Swan Island, decreasing to 16 feet deep at 
Gardiner; channel west of Swan Island, 100 feet wide, 12 
feet deep, except at upper shoal, where depth was to be 
15 feet; and channel 125 feet wide and 11 feet deep from 
Gardiner upstream to Augusta at head of navigation. 
Section of river included in project is about 44 miles long. 
Work includes dredging, rock excavation, and two riprap 
training walls. (See Table 1-B at end of chapter for Acts 
authorizing existing project). 
Local cooperation. None required. 
Terminal facilities. Wharves suitable for landing or 
loading are at Bath, Woolwich, Richmond, Randolph, 
Gardiner, Hallowell, and Augusta. Rail connections are 
available at some wharves. Depths alongside range from 
12 to 25 feet. Many facilities are equipped with mechanism 
for handling passengers and freight. Facilities are 
considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: Payment 
of an additional $17,151 was made for demobilizing 
the Government-owned hopper dredge MC FARLAND 
for maintenance dredging performed last fiscal year. 
Hired labor costs of $799 were incurred for plotting 
surveys. 
14. MILFORD HARBOR, CT 
Location. On north shore of Long Island Sound, about 
8 miles west of New Haven Harbor, CT. (See National 
Ocean Survey Chart 12370). 
Previous projects. For details, see Annual Report for 
1915 and Annual Report for 1938. 
Existing project. Provides for a channel, an anchorage 
and two riprap jetties. For further detailed description, 
see Annual Report for 1974. Project is complete except for 
following inactive portions: an 8-foot east basin 
anchorage and Section 107 6-foot anchorage. Burns Point 
jetty was repaired in 1963. (See Table 1-B at end of 
chapter for Acts authorizing existing project). 
Local cooperation. Specifically authorized project. 
Fully complied with for completed portion. Disposal 
areas are required for maintenance. 
Terminal facilities. Three bulkhead wharves near 
entrance are used by oyster industry. City wharf and 
launching ramp near head of navigation are open to public 
use. Connecticut State Shellfish Commission operates 
a small wharf not open to public. There are several yacht 
landings. Facilities are adequate for existing traffic. 
Operations during fiscal year. Maintenance: Hired 
labor costs of $24,999 were incurred for preparation of 
plans and specifications and surveys in connection with 
proposed maintenance dredging. Work includes reorienting 
project limits to resolve longstanding encroachment 
problems. Contributed Funds in the amount of $200,000 
were received from the city of Milford to cover the initial 
cost of realignment dredging. 
15. NEW HAVEN HARBOR, CT 
Location. On north shore of Long Island Sound, about 
75 miles east of New York City. (See National Ocean 
Survey Chart 12371). 
Previous project. For details, see Annual Report for 
1915 and 1938. 
Existing project. A main channel 35 feet deep, 400 to 
800 feet wide, from Long Island Sound to Tomlinson 
Bridge; two anchorage basins below Tomlinson Bridge of 
16- and 15-foot depths; a pile-and-riprap dike about 4,200 
feet long, to contract tidal flow at Fort Hale bar; a 
channel 12 feet deep and 100 to 150 feet wide, from 
southwest corner of 16-foot anchorage basin via City 
Point and West Haven wharf front to Kimberly Avenue 
Bridge; thence 12 feet deep and prevailing width of 75 
feet up West River to about 600 feet upstream of 
Kimberly Avenue Bridge, and an anchorage basin 6 feet 
deep in West River opposite Mars wharf; a channel 100 
feet wide and 12 feet deep from 15-foot anchorage basin 
toward Brewery Street, about 300 feet; a channel in 
Quinnipiac River 22 feet deep and 250 to 400 feet wide to 
a point about 1,000 feet above Ferry Street, thence 16 feet 
deep and 200 feet wide to Grand Avenue, with turning 
basin 22 feet deep, 200 to 800 feet wide, and 700 feet long 
at mouth of Mill River; a channel up Mill River 12 feet 
deep, 200 feet wide to junction of two branches above 
Chapel Street, thence to Grand Avenue, 100 feet wide in 
East Branch and generally 125 feet wide in West Branch; 
and removal of certain obstructive rocks in Morris Cove. 
Modification authorized by 1986 Water Resources 
Development Act provides for: deepening the main ship 
channel to 40 feet; widening main ship channel from 400 
to 500 feet; widening ship channel bend at Southwest 
Ledge from 500 feet to a minimum of 780 feet, straightening 
the channel bend downstream of the existing 
turning basin and; revising the configuration of the existing 
35-foot deep turning basin to provide a common, 
smaller 40-foot turning basin. 
Total estimated cost (October 1986) for new work is 
$27,200,000 exclusive of $4,205,246 for new work completed 
before 1953 and amounts expended on previous 
projects. The 22-foot channel and turning basin is to be restudied. 
Estimated cost (1960) of this portion is $980,000. 
(See Table 1-B at end of chapter for Acts authorizing 
existing project). 
Local cooperation. Fully complied with for completed 
work. Assurances for 1986 modifications have not been requested. 
Local interests must provide all lands, easements, 
rights-of-way, and dredged material disposal areas necessary 
for construction and later maintenance of the project; 
1-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
pay 100 percent of the costs for local improvements, presently 
estimated at $1,140,000; pay 25 percent of project 
costs allocated to deep draft navigation during construction, 
presently estimated at $6,515,000; and pay an additional 
10 percent of project costs within the 30-year period 
following construction, offset by a credit for the value of 
lands, easements, rights-of-way, relocations (except utility 
relocations) and dredged material disposal areas. 
Terminal facilities. Port of New Haven is served by 24 
waterfront facilities; most are within city limits of New 
Haven. Improved waterways within port area along 
which facilities are located include West River, Main 
Harbor, West and East Branches of Mill River, and 
Quinnipiac River channels. Facilities are all privately 
owned and operated with exception of city wharf and 
U.S. Coast Guard wharf. Depths alongside piers and 
wharves range from 35 to zero feet at mean low water. 
Some of the facilities have rail connections and all are 
accessible by paved streets. Facilities are adequate for 
existing commerce. (For further details see Ports of 
Southern New England No. 4, revised 1983). 
Operations during fiscal year. New work: Planning, 
engineering and design effort for this improvement was 
initiated this year. Efforts were focused on an update of 
project economics and studies of the project's impact on 
the oyster beds in New Haven Harbor. The Congressional 
authoritization required a report within one year on the 
impacts to the oyster industry, and that report was 
essentially complete by fiscal year end. Services of the 
Waterways Experiment Station were utilized in conjunction 
with the oyster beds study as well as for ship 
simulation model studies. 
16. NEWBURYPORT HARBOR, MA 
Location. On south bank of Merrimack River, about 
2.5 miles above mouth, and about 48 miles by water north 
of Boston. (See National Ocean Survey Chart 13282). 
Existing project. Two jetties, one projecting 4,118 feet 
from the north shore, the other projecting 2,445 feet from 
the south shore, converging until 1,000 feet apart, then 
extending seaward 1,000 feet parallel to axis of channel; 
partially closing Plum Island Basin by a timber dike; 
channel 12 feet deep and 400 feet wide through bar, 
thence 9 feet deep and 200 feet wide to and including a 
widened turning basin in front of wharves. (See Table 1- 
B at end of chapter for Acts authorizing existing project). 
Existing project was completed in August 1958, with the 
improvement of 12-foot channel and outer harbor. North 
jetty was completed in 1914; south jetty was completed, 
except for a length of about 30 feet at its outer end, in 
1905. Required rehabilitation in these jetties completed in 
September 1970. Plum Island Basin was partially closed 
in 1883 by construction of a timber dike. North Rock was 
removed on 1901. 
Local cooperation. Fully complied with. 
Terminal facilities. Marinas, a yacht club, public 
landings, and a commercial fish pier extend along a 
frontage of the south bank of Merrimack River below 
highway bridge and one town pier and four marinas on 
the north side of river. Terminal facilities are adequate 
for existing commerce. 
Operations during fiscal year. Maintenance: A contract 
for maintenance dredging was awarded in July 1987 
and completed in September 1987. Contract costs were 
$288,464 with 156,265 cubic yards of material removed by 
hopper dredge and disposed of in open water off Plum 
Island Beach. Hired labor costs of $54,637 were incurred 
for preparation of an environmental assessment, plans and 
specifications, supervision and inspection and surveys. 
17. PLYMOUTH HARBOR, MA 
Location. Harbor is 45 miles by water south of Boston. 
Its outer anchorage, the "Cow Yard," is common to 
Plymouth, Duxbury, and Kingston. (See National Ocean 
Survey Chart 13253). 
Previous projects. For details, see Annual Report for 
1815 and 1938. 
Existing project. Provides for: protecting by riprap 
sections of Long Beach damaged by storm of November 
1898, and restoring Eel River to its former course; dredging 
a channel 18 feet deep and 200 feet wide, increased at 
entrance and on curves, from the bay to town wharves, 
formerly in areas south of State pier, a distance of about 
2.5 miles, with a suitable turning basin at inner end; 
dredging a channel 150 feet wide, 15 feet deep, extending 
northwesterly about 0.3 miles from a point off site of 
northerly Craigs wharf (now State pier) with a turning 
basin 300 feet square, and of same depth, at its northwesterly 
end; maintenance of area dredged to 18 feet deep 
by the Commonwealth of Massachusetts, connecting 15- 
foot channel with 18-foot channel in vicinity of State pier; 
a rubblestone breakwater extending 1,400 feet easterly 
from a point north of Town wharf, and thence southeasterly 
for 2,100 feet; an anchorage 8 feet deep and 60 
acres in area inside breakwater; and elimination of 
authorized 18-foot anchorage from existing project; 
recreational development, to provide for sport fishing 
from breakwater, consisting of stone causeway about 360 
feet long from westerly end of breakwater to land, guardrail 
along top of breakwater and causeway, footbridge 
spanning a navigation opening through breakwater, and 
public access, parking and sanitary facilities for sport 
fisherman use. (See Table 1-B at end of chapter for Acts 
authorizing existing project.) Project is complete. Construction 
of anchorage 8 feet deep and 60 acres in area 
inside breakwater was completed in 1967. Construction of 
the rubblestone breakwater was completed in 1971. 
Rehabilitaion of Long Beach Dike was completed in 1971. 
Local cooperation. Fully complied with. 
Terminal facilities. There are three wharves of pile 
and timber construction; one is owned by the State, one 
by the town, and the third by Plymouth Yacht Club. State 
and town wharves are open to public use. In addition, 
there are two boatyards with marine railway facilities 
along waterfront, equipped for boat building and repairs. 
Local interests will maintain existing public landings 
open to all on equal terms, and provide all necessary 
mooring facilities in anchorage. 
Operations during fiscal year. Maintenance: A continuing 
contract was awarded in August 1987 for maintenance 
dredging of existing Federal channel. Hired 
labor costs of $39,406 were incurred for preparation of 
1-8

NEW ENGLAND DIVISION 
plans and specifications and surveys. Contractor earnings 
this fiscal year were $20,000 for mobilization costs. 
Dredging had not started at close of fiscal year. 
18. POINT JUDITH POND 
AND HARBOR OF REFUGE, 
POINT JUDITH, RI 
Location. Point Judith marks southwestern entrance 
to Narragansett Bay. Harbor lies in shallow bight west of 
point, about 14 miles southwest of Newport Harbor, RI, 
and 33 miles east of New London Harbor, CT. Point Judith 
Pond is a shallow salt pond, with a length north and south 
of about 4 miles, lying in rear of sandy beach of Rhode 
Island shore, just west of Point Judith Harbor by a narrow 
opening through sand dunes. (See National Ocean Survey 
Charts 13218 and 13219). 
Previous project. For details see Annual Report for 
1948. 
Existing project. For description of existing project 
see Annual Report for 1977. (See Table 1-B at end of 
chapter for Acts authorizing existing project). All work 
for project authorized prior to 1949 was completed in 
1950. Breakwaters were completed in 1914 and dredging 
of shoals in project area was done in 1921. Main and east 
shore arm breakwater had deteriorated and required 
restoration to project design. In 1962 reconstruction of 
east arm breakwater and main breakwater dock facilities 
were completed. Rehabilitation required for remainder 
of breakwater restoration was completed in October 1963. 
The extension of the 15-foot channel was completed in 
April 1977. 
Local cooperation. Fully complied with. 
Terminal facilities. Consist of one town wharf of steel 
sheetpile bulkhead construction which comprises 
southern and eastern limits of basin. Total docking space 
amounts to 500 feet. No mechanical handling facilities 
are available. Wharf is owned by the town and open to the 
public. State of Rhode Island maintains two State piers, 
one in Galilee and one in Jerusalem, each having about 
500 feet of berthing space. A facility comprising a bulkhead 
with 15 finger piers projecting channelward there 
from provides berthing space of about 4,000 linear feet. 
This facility is used for receipt of fish and fish products. 
Mechanical handling facilities including fish pumps, are 
available for discharge of cargo. In addition, there are 
approximately 10 small privately owned wharves used in 
the fishing business and passenger traffic. Facilities are 
adequate for existing commerce. 
Operations during fiscal year. Maintenance: Payment 
of $739,293 for contract claims was made to the contractor 
relative to the main breakwater repair contract which 
was terminated in fiscal year 1984. Further payments, if 
any, are pending results of audit. Total contract cost 
through the end of the fiscal year was $1,950,702. Costs of 
$126,974 were incurred during the fiscal year for an audit 
performed by the Chicago Distrct relating to the contract 
claim. A payment of $1,476 was made this fiscal year for 
the removal and disposal of stockpiled stones for a total 
contract cost of $3,690. 
19. PORTSMOUTH HARBOR AND 
PISCATAQUA RIVER, 
ME AND NH 
Location. Piscataqua River forms a portion of boundary 
between Maine and New Hampshire. Mouth of this river 
is called Portsmouth Harbor. It is 45 miles northeast of 
Boston Harbor, MA and 37 miles southwest of Portland 
Harbor, ME. (See National Ocean Survey Chart 13278). 
Previous project. For details see Annual Report for 
1892. 
Existing project. Removal of ledge rock areas in 
vicinity of Gangway Rock, southwest point of Badgers 
Island and Boiling Rock to 35 feet deep; widening 35-foot 
channel at bends by removal of ledge rock areas in 
vicinity of Henderson Point, Gangway Rock, Badgers 
Island, Maine-New Hampshire Interstate Bridge and 
Boiling Rock; and extending channel from above Boiling 
Rock to a point about 1,700 feet above Atlantic Terminal 
Sales dock in Newington generally 400 feet wide, and 35 
feet deep below mean low water with manuevering basins 
above Boiling Rock and at head of project; channel 6 feet 
deep, 100 feet wide from Little Harbor through Rye-New 
Castle drawbridge, then northerly between mainland and 
Leach's Island to deep water in vicinity of Shapleigh and 
Goat Islands, channel 75 feet wide 6 feet deep up Sagamore 
Creek to public landing on downstream side of Sagamore 
Avenue bridge and anchorage strip, 6 feet deep, 75 feet 
wide, totalling 3 acres, adjacent to channel in Sagamore 
Creek. Public Law 86-645, Sec. 107, 1960 River and Harbor 
Act, as amended in 1965 and by Chief of Engineers, 
December 23, 1965 authorized construction of the 6-foot 
channels and anchorages. Modification authorized by 1986 
Water Resources Development Act provides for: widening 
of the 35-foot deep channel from 600 feet to 1,000 feet 
between two vertical lift bridges; widening northern limit 
of 35-foot deep channel adjacent to Badgers Island by 100 
feet; and widening southern limit of existing 35-foot deep 
channel at Goat Island from 400 to 550 feet. Total estimated 
cost (October 1986) for new work is $18,400,000 exclusive 
of $5,384,043 for new work completed before 1971 and 
amounts expended on previous projects. (See Table 1-B at 
end of chapter for Acts authorizing existing project). 
Local cooperation. Fully complied with for completed 
work. Assurances for 1986 modification are being 
processed. Local interests must pay the initial 25 percent 
of project costs concurrent with project construction and 
reimburse the additional 10 percent within the 30-year 
period following completion of construction. In addition, 
local interests must do the following, for which there is no 
estimate of cost: provide all lands, easements and rightsof-
way necessary for construction and later maintenance 
of the project including suitable areas determined by the 
Chief of Engineers to be required in the general public 
interest for initial and later disposal of dredged material 
and including necessary retaining dikes, bulkheads, 
and embankments therefor, or the costs of such retaining 
works; provide and maintain adequate terminal and 
transfer facilities open to all on equal terms; provide and 
maintain adequate depths in berthing areas and local 
access channels serving the terminals; accomplish all alter- 
1-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
ations and relocations of transportation facilities (excluding 
railroads, combined highway and railroad and publicly 
owned highway bridges and approaches thereto), storm 
drains, sewer outfalls, utilities and other structures and 
improvements made necessary by the project; prohibit the 
erection of any structure, within a distance to be determined 
by the Chief of Engineers, from the bottom edge of 
the proposed channel and turning basin. 
Terminal facilities. Waterfront terminals are chiefly on 
south bank of Piscataqua River in Portsmouth and 
Newington. U.S. Navy Yard is on opposite bank at Kittery, 
Maine. Eighteen piers, wharves, and landings represent 
available terminals for handling the port's waterborne 
commerce. Navy Yard is not used for commercial activities. 
On Maine side of river are a town landing and two 
docks. On New Hampshire side there are 13 terminals, 6 
of which include a public landing, 2 docks, 3 facilities used 
for vessel mooring and landings, are at Portsmouth. In 
addition there are a number of private recreational boat 
docks. Terminal facilities are considered adequate for 
existing commerce. (See Port Series 1 for Ports of Searsport 
and Portland, Maine, and Portsmouth, NH) 
Operations during fiscal year. New work: Preconstruction 
engineering and design, including the preparation 
of contract plans and specifications, was essentially 
completed during the year. A Local Cooperation Agreement 
was drafted and reviewed by all parties during the 
year, and at year end a final copy was with the project 
sponsor, the State of New Hampshire, for signature. The 
New Hampshire Legislature appropriated the sponsor's 
portion of construction costs as required under the terms 
of the Local Cooperation Agreement. Funds to initiate 
construction were appropriated by Congress this year. 
20. ROCKPORT HARBOR, ME 
Location. On the westerly side of Penobscot Bay, about 
6 miles north of Rockland, Maine. (See National Ocean 
Survey Charts 13305 and 13307). 
Previous project. For details see Annual Report for 
1915. 
Existing project. Remove the ledge at the entrance to 
the depth of 15 feet at mean low tide, thereby widening 
the entrance channel about 250 feet. The mean range in 
tides is 9.8 feet. Project was completed in December 1913. 
Local cooperation. None required. 
Terminal facilities. The major facility is a town 
operated marine park. There is a Rockport Boat Club, 
apprenticeshop, marine and a town operated commercial 
bulkhead. Facilities are adequate for existing commerce. 
Operations during fiscal year. Maintenance: A continuing 
contract was awarded in July 1987 for maintenance 
dredging with work to be performed after late September. 
Hired labor costs of $11,805 were incurred for preparation 
of plans and specifications, plotting and surveys. Contractor 
earnings this fiscal year were $19,999 for mobilization 
costs. Dredging had not started at the end of the 
fiscal year. 
21. ROCKPORT HARBOR and 
PIGEON COVE, ROCKPORT, MA 
Location. The town of Rockport is located on the seaward 
end of Cape Ann on the northeast Massachusetts 
coast about 35 miles north of Boston. The town is bordered 
by the city of Gloucester to the west, Essex Bay to the 
north, Massachusetts Bay to the south, and Sandy Bay to 
the east. (See National Ocean Survey Charts 13278 and 
13279). 
Existing project. Rebuilding the two breakwaters at 
entrance of harbor with rubblestone to a height of 18.5 feet 
and removing the principal rocks in the harbor. This work 
was completed in 1905. Current modification: An access 
channel -10 feet deep at mean low water (MLW) by 80 feet 
wide, leading from deep water outside the existing Federal 
breakwaters 1,100 feet to the town wharf at the center of 
the harbor. At the wharf the 10-foot channel branches to 
form two 40-foot-wide channels leading to the north and 
south inner anchorage basins which are separated by the 
wharf. The North Basin would have an area of 1.7 acres 
and a depth of -8 feet MLW. The South Basin would have 
an area of 1.3 acres and a depth of -8 feet MLW. Two 
additional outer harbor anchorages, both 8 feet deep at 
MLW would be located along the 80-foot wide access 
channel between the breakwaters and the town wharf. 
The plan of improvement developed for Pigeon Cove 
consists of a 75-foot wide channel -10 feet deep MLW 
extending from deep water outside the breakwater 550 
feet across the southeast end of the cove to the public pier 
and offloading facilities. An anchorage area north of the 
channel would be dredged to -8 feet deep MLW. (See Table 
1-B at end of chapter for Acts authorizing existing project). 
Local cooperation. For the current modification: contribute 
in cash, prior to construction, 3.3 percent of the 
first cost of construction; provide, maintain and operate 
without cost to the United States, an adequate public 
landing with provisions for the sale of motor fuel, lubricants 
and potable water open and available to the use of 
all on equal terms; provide without cost to the United 
States all necessary lands, easements and rights-of-way; 
hold and save the United States free from damages that 
may result from construction, operation, and maintenance 
of the project, except for damages due to the fault or 
negligence of the United States or its contractors; accomplish 
without cost to the United States alterations and 
relocations as required in sewer, water supply, drainage 
and other utility facilities; provide and maintain mooring 
facilities as needed for transient and local vessels as well 
as necessary access roads, parking areas and other needed 
public-use shore facilities; assume full responsibility for 
all project costs in excess of the Federal statutory cost 
limitations; establish regulations prohibiting the discharge 
of untreated sewage, garbage, and other pollutants 
in the waters of the harbor. 
Terminal facilities. There are four commercial 
wharves, one of granite, the others of timber construction. 
There is one yacht club with a public landing. Facilities 
are adequate for present commerce. 
1-10

NEW ENGLAND DIVISION 
Operations during fiscal year. New work: Work on 
the improvement dredging contract awarded last fiscal 
year was begun in late October 1986 and completed in 
July 1987. Contract earnings to date are $876,697; current 
contract amount is $962,947 but final contract figure 
is yet to be determined pending review of liquidated 
damages assessment, time delays, and possible claims. 
22. RYE HARBOR, NH 
Location. On Atlantic coast of New Hampshire about 
five miles south of Portsmouth Harbor. It is a natural 
cove of about 39 acres protected by two breakwaters. (See 
National Ocean Survey Chart 13283). 
Existing project. Provides for dredging a channel 100 
feet wide and 10 feet deep for 600 feet through entrance, 
thence 8 feet deep for 1,700 feet within harbor; dredging 
two 5-acre anchorages, one 8 feet deep and the other 6 feet 
deep; and maintaining existing breakwaters. Project 
depths refer to mean low water. Mean range of tide is 8.4 
feet. Existing project was essentially completed in October 
1962. Removal of ledge encountered during dredging 
process was completed in July 1964. (See Table 1-B at end 
of chapter for Act authorizing existing project). 
Local cooperation. Fully complied with. 
Terminal facilities. Much of the shoreline around Rye 
Harbor is undeveloped State property. Private ownership 
is limited to about 500 feet on the north shore west of 
Ragged Neck State Park, and to the south shore between 
the bridge and breakwater. State docking facilities and a 
boat launching ramp are available at the head of the 
harbor. Primarily, berthing is in the Federal and State anchorages. 
Facilities are adequate for existing commerce. 
Operations during fiscal year. Maintenance: Scheduled 
maintenance dredging was deferred pending resolution 
of ongoing disputes concerning the disposal site 
provided by the State. $350,000 in Contributed Funds for 
disposal site construction and State of New Hampshire 
maintenance and improvement dredging was returned to 
the State. Hired labor costs of $40,967 were incurred for 
preparation of plans and specifications, field surveys, 
plotting, and sampling and testing. 
23. SESUIT HARBOR, MA 
Location. Sesuit Harbor is located on the north shore 
of Dennis in Barnstable County, about 85 miles southeast 
of Boston, MA. The town of Dennis is bordered on the 
north by Cape Cod Bay, Brewster and Harwich on the 
east, Nantucket Sound on the south, and Yarmouth on the 
west. Land area within the town is 20.66 square miles and 
has a tidal shoreline of 29.8 miles. (See National Ocean 
Survey Chart 13250). 
Existing project. Provides for a channel 6 feet deep 
below mean low water and 100 feet wide from deep water 
in Cape Cod Bay to a point opposite the Dennis Yacht Club 
thence reducing in width to 80 feet at the entrance to the 
inner harbor basin, for a total channel length of 2,400 
feet. (See Table 1-B at end of chapter for Act authorizing 
existing project). Project was completed in August 1982. 
Local cooperation. Local interests are responsible for 
fifty percent of the project construction costs, as well as the 
costs for dredging of all berthing areas outside the limits 
of the Federal project. They would also be responsible for 
provision of necessary lands, easements, rights-of-way; any 
necessary vegetation of disposal areas; holding the United 
States free from damages due to construction and maintenance 
of additional berthing spaces as required for 
expansion of the project support facilities during the life 
of the project as well as establish regulations prohibiting 
disposal of pollutants into the waterway. Required contributions 
have been received. 
Operations during fiscal year. Maintenance: Hired 
labor costs of $4,745 were incurred for preparation of 
plans and specifications for maintenance dredging of the 
project. Bids for the work were opened in July 1987. Contract 
award was deferred pending resolution of questions 
concerning the apparent low bidder's ability to perform 
the work. 
24. RECONNAISSANCE AND 
CONDITION SURVEYS 
(See Table 1-Q at end of chapter). 
25. OTHER AUTHORIZED 
NAVIGATION PROJECTS 
(See Table 1-C at end of chapter). 
26. NAVIGATION ACTIVITIES 
PURSUANT TO SECTION 107, 
PUBLIC LAW 86-645 
(PRE AUTHORIZATION) 
(See Table 1-H at end of chapter). 
Alterations of Bridges 
27. AUTHORIZED BRIDGE 
ALTERATION 
Location. Chelsea Street Highway Bridge, MA. Construction 
was completed in October 1961 with a Federal 
cost of $138,518. In addition non-Federal contributed 
funds amounted to $8,062. For details see page 63 of 
Annual Report for 1962. 
28. REVERE BEACH, MA 
Location. In the city of Revere, Suffolk County, Massachusetts, 
approximately 7 miles north of the main entrance 
channel to Boston Harbor and 6 miles northeast of the city 
of Boston. (See National Oceanic and Atmospheric Administration 
Chart No. 13275 and U.S. Geological Survey Maps, 
Boston Bay quadrangle). 
Existing project. Placement of sandfill along 13,000 
feet of beach. The top of the sandfill will be placed at 18 
feet above mean low water, including a 50-foot wide 
berm, sloping one-foot vertical in 15 feet horizontal to 
meet the existing beach. The total width of the beach will 
1-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
extend approximately 300 feet, of which, about 185 feet 
is above the mean high water line. The estimated total 
first cost (October 1986) of the project is $7,110,000 of 
which 35 percent is non-Federal. (See Table 1-B at end of 
chapter for Acts authorizing existing project). 
Local cooperation. Formal assurances have not been 
requested. Consistent with the cost sharing and financing 
concepts contained in the Water Resources Development 
Act of 1986 (P.L. 99-662), local interests are required to: 
contribute in cash 35 percent of the cost of construction 
of the project, presently estimated at $2,490,000; 
contribute in cash 35 percent of the periodic nourishment 
cost for an initial period of 50 years, now estimated at 
$22,500 annually, such contribution to be prior to each 
nourishment operation; assure the continued performance 
of the periodic nourishment and repair of the project 
after the first 50 years and during the economic life as 
may be required to serve the intended purpose; assure 
that water pollution that would endanger the health of 
bathers would not be permitted; hold the United States 
free from damages due to construction of the project; provide 
all necessary lands, easements and rights-of-way for 
the initial construction and subsequent nourishment of 
the project; assure continued public ownership of the 
shore and its administration for public use during the 
economic life of the project. 
Operations during fiscal year. New work: Advance 
engineering and design continued with focus on coordination 
with local interests on availability and suitability of 
sandfill source, satisfying environmental and permit requirements, 
and the preparation of a Local Cooperation 
Agreement. Although initial construction funds were 
appropriated this fiscal year, the Local Cooperation 
Agreement had not been executed by fiscal year end and 
hence construction had not been initiated. 
29. INSPECTION OF COMPLETED 
BEACH EROSION CONTROL 
PROJECTS 
Inspections of beach erosion projects were not conducted 
in fiscal year 1987. 
30. OTHER AUTHORIZED BEACH 
EROSION CONTROL 
PROJECTS 
(See Table 1-D at end of chapter). 
31. BEACH EROSION CONTROL 
ACTIVITIES PURSUANT TO 
SECTION 103, PUBLIC LAW 
87-874 (PREAUTHORIZATION) 
(See Table 1-I at end of chapter). 
Flood Control 
32. BIG RIVER RESERVOIR, RI 
Location. Dam would be located just upstream of the 
existing Flat River Reservoir in Coventry, Rhode Island, 
where Ifarkney Hill Road crosses the Big River. The reservoir 
would be in communities of Coventry and West Greenwich, 
Rhode Island. (See Geological Survey Maps for Hope 
Valley, Slocum, Crompton and Coventry Center, RI). 
Existing project. Dam would be rolled-earth 2,240 feet 
long with height of 70 feet over streambed. Total storage 
capacity provided by the reservoir would be 95,400 acrefeet 
consisting of 12,300 acre-feet of conservation storage, 
73,600 acre-feet of water supply storage and 9,500 acrefeet 
of flood control storage which is equivalent to six 
inches of runoff from the 29.7 square mile watershed 
above the dam. Outlet works located in the left abutment 
would consist of an intake channel, a gatehouse of twinwell 
design to provide for flood control regulation and 
releases for water supply, conduits, outlet structure and 
outlet channel to the upstream end of Flat River Reservoir. 
The spillway would be located in a rock cut in the left 
abutment and would consist of a chute-type spillway with 
a 400-foot uncontrolled concrete weir. Discharge would be 
directly into the upstream end of Flat River Reservoir. 
Operation of the proposed Big River Reservoir in combination 
with the existing water supply facilities at Scituate 
Reservoir would provide a safe yield for water supply 
purposes of about 113 MGD. Total estimated cost (October 
1986) for new work is $34,630,000 for construction and 
$54,270,000 for lands and damages (including road and 
utility relocations), a total of $88,900,000. (See Table 1-B 
at end of chapter for Act authorizing existing project). 
Local cooperation. Formal assurances have not been 
requested. Local interests must provide: 5 percent of the 
total costs allocated to flood control presently estimated at 
$374,000; all lands, easements rights-of-way and relocations 
allocated to flood control but limited such that the 
value is 45 percent of total cost allocated to flood control, 
presently estimated at $3,366,000; bear all costs of operation, 
maintenance and replacement for flood control facilities 
presently estimated at $106,000 annually; pay all 
costs allocated to municipal and industrial water supply, 
presently estimated at $79,660,000 for construction and 
$420,000 annually for operation, maintenance and major 
replacements; pay one-half of the separable costs allocated 
to recreation, presently estimated at $660,000, and bear all 
costs of operation, maintenance and replacement of recreation 
facilities, presently estimated at $88,000. 
Operations during fiscal year. New work: None. 
33. BLACKSTONE RIVER BASIN, 
MA AND RI 
Works covered by this plan include a dam and reservoir 
on West River and local protection works at three cities on 
Blackstone River. Flood Control Act of 1944 authorized 
plan for a reservoir on West River and local protection 
works at Worcester, MA, and Woonsocket and Pawtucket, 
RI, substantially in accordance with House Document 624, 
78th Congress, 2nd session. Flood Control Act of 1960 
authorized a local flood protection project at lower Woonsocket, 
RI, substantially in accordance with Senate Document 
87, 85th Congress, 2nd session. Local protection 
nonstructural project authorized in 1982 for Belmont Park 
section of Warwick, RI along the Pawtuxet River. Streambank 
protection projects on the Blackstone River in 
Millbury, MA and on the Clear River in Burrillville, RI 
1-12

NEW ENGLAND DIVISION 
were authorized in 1985. (See Table 1-K at end of chapter 
on reservoir and local protection projects, Blackstone River 
Basin, for projects comprising authorized plan). 
33A. CLEAR RIVER, 
BURRILLVILLE, RI 
Location. The town of Burrillville is located in the 
northwest corner of Rhode Island. The main stem of the 
Clear River originates in the northwest corner of Rhode 
Island and flows easterly for 8 miles to its confluence with 
the Branch River. 
Existing project. Remove approximately 60 linear feet 
of granite retaining wall, which has been damaged from 
erosion, and construct a new mortared stone wall. (See 
Table 1-B at end of chapter for Act authorizing existing 
project). 
Local cooperation. Fully complied with. 
Operations during fiscal year. New work: The construction 
contract awarded last fiscal year was completed 
in October 1986. Final contract amount was $108,884. 
33B. WEST HILL DAM, MA 
Location. Dam is on West River, MA, 3 miles above its 
confluence with Blackstone River and 2.5 miles northeast 
of Uxbridge, MA. (See Geological Survey maps - 
Blackstone, MA and RI, Milford, MA and Grafton, MA). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Work on contract for dam and 
appurtenant structures was initiated in June 1959 and 
completed in June 1961. Construction of recreational facilities 
was completed in June 1967. 
Local cooperation. Section 3, Flood Control Act of 1944 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. A contract to construct 
restroom access and repair the dam road was 
awarded in November 1986 and completed in August 1987. 
Contract amount was $42,166. 
34. CHARLES RIVER (NATURAL 
VALLEY STORAGE AREAS), MA 
Location. The Charles River extends inland from 
Boston Harbor southwesterly toward the Massachusetts- 
Rhode Island border and is some 80 miles long with a 
watershed covering 307 square miles. 
Existing project. The project provides for Federal 
aquisition and protection of 17 natural valley storage areas 
totalling 8,102 acres in what is known as the Middle and 
Upper watershed of the Charles River. The aquisition in 
fee or by easement of the major natural valley storage 
areas within the Charles River watershed is intended as 
a multiple-purpose project for flood control, recreation, 
and fish and wildlife management. The latest cost 
estimate for new work is $9,000,000. (See Table 1-B at end 
of chapter for Act authorizing existing project). Land 
aquisition is complete. 
A total of 3,210 acres have been aquired in fee at a cost 
of $2,152,683 and restrictive easements have been obtained 
for 4,892 acres at a cost of $591,193. 
Local cooperation. Local interests are required to prevent 
modifications or alteration of existing roadways, 
utilities, bridges, culverts, and any other improvements 
that might affect the drainage characteristics of the natural 
storage areas; adopt and enforce regulations to restrict 
development of flood plan lands; and operate and maintain 
the existing dams along the Charles River. Local assurances 
have been received. 
Operations during fiscal year. New Work: Resolution 
of remaining condemnation cases continued. Of 22 tracts 
remaining to be settled at the beginning of the fiscal year, 
19 were resolved. Fiscal year costs totalled $46,706 including 
$17,550 for fee/easement aquisition, $9,356 in hired 
labor costs for miscellaneous project administration activities, 
and $19,800 for condemnation trial activity. Maintenance: 
Contract costs of $165,500 for boundary marking 
were incurred. Hired labor costs for project surveillance 
and inspection as well as land use administration were 
$83,200. 
35. CONNECTICUT RIVER BASIN 
VT, NH, MA and CT 
Location. Works covered by this project are a series of 
dams and reservoirs on tributaries of Connecticut River 
in Vermont, New Hampshire and Massachusetts, within 
a radius of 230 miles from Hartford, CT and local protection 
works at several cities in the basin. 
Existing project. Flood Control Act of 1936, as 
amended by Act of May 25, 1937, authorized construction 
of 10 reservoirs on tributaries of Connecticut River in 
accordance with plans in House Document 412, 74th 
Congress, 2nd session, as the same may be revised upon 
further investigation of 1936 flood. Flood Control Act of 
1938 approved a general comprehensive plan for control 
of floods and other purposes in Connecticut River Valley, 
as set forth in House Document 455, 75th Congress, 2nd 
session, and authorized $11,524,000 for construction of 
local flood protection projects in the plan. Act of October 
15, 1940, modified Act of June 18, 1938, to provide 
additional protection at East Hartford, CT, as set forth in 
House Document 653, 76th Congress, 3rd session. Act of 
August 18, 1941, modified comprehensive plan approved 
in 1938 to include improvements recommended in House 
Document 653, 76th Congress, 3rd session, and House 
Document 724, 76th Congress, 3rd session, with such 
further modifications as may be found justifiable in 
discretion of Secretary of the Army and Chief of 
Engineers. Latter Act also authorized to be appropriated 
additional $6 million for local protection works and $10 
million for reservoirs. Act of October 26, 1942, further 
modified plan by including construction of Gully Brook 
conduit at Hartford, CT. Flood Control Act of 1944 
authorized expenditure of $30 million in addition to previous 
authorzation for comprehensive plan approved in 
1938 and modified plan by directing specific consideration 
of an alternative plan of Vermont State Water Conser- 
1-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
vation Board instead of Williamsville Reservoir in West 
River Basin, VT; directing consultation with affected 
States during course of investigations and transmission of 
proposal and plans to each affected State for written views 
and recommendations for reservoir projects heretofore 
authorized for construction at Cambridgeport, Ludlow, 
South Tunbridge, and Gaysville, and resubmission of 
projects or modifications for construction of Sugar Hill 
site. Flood Control Act of 1950 modified project for flood 
control at Hartford, CT, authorized by Flood Control Act 
of 1938, as amended to include Folly Brook dike and 
conduit. Flood Control Act of 1954 modified plan for flood 
control in Connecticut River Basin to provide for 
construction of a reservoir on Otter Brook at South Keene, 
NH, in lieu of any reservoir or reservoirs heretofore 
authorized. This Act further modified plan for West River 
Basin of Connecticut River in Vermont to consist of three 
reservoirs at Ball Mountain, The Island, and Townshend 
sites, in lieu of plan of eight reservoirs authorized in Flood 
Control Act of 1944. Flood Control Act of 1958 modified 
plan for flood control in Connecticut River Basin to include 
construction of Littleville Reservoir on Middle Branch of 
Westfield River, MA and Mad River Reservoir on Mad 
River, above Winsted, CT. Flood Control Act of 1960 
included authorization in Connecticut River Basin of plan 
for flood protection on Chicopee River, MA, substantially 
in accordance with House Document 434, 86th Congress; 
plan for flood protection on Westfield River, MA, 
substantially in accordance with Senate Document 109, 
86th Congress; plan for flood control and related purposes 
on Farmington River, CT, substantially in accordance 
with House Document 443, 86th Congress. Flood Control 
Act of 1968 included authorization in Connecticut River 
Basin of plan for construction of Beaver Brook Reservoir, 
on Beaver Brook in Keene, NH, substantially in accordance 
with Senate Document 60, 90th Congress; and plan 
for protection on Park River, CT, substantially in accordance 
with Senate Document 43, 90th Congress. Flood 
Control Act of 1970 deauthorized the construction of a 
reservoir at Claremont, NH. The Water Resources 
Development Act of 1976 deauthorized the construction of 
Gaysville Lake, Vermont project. Flood control projects at 
Cambridgeport Lake, Brockway Lake, Victory Lake, 
South Tunbridge Lake, Ludlow Lake and The Island 
Lake, Vermont; Honey Hill Lake, West Canaan Lake, and 
the Alternative to Sugar Hill Reservoir, New Hampshire, 
were deauthorized in August 1977 in accordance with 
Section 12 of the Water Resources Development Act of 
1974. The authorization for Beaver Brook Lake, New 
Hampshire project expired in April 1978 due to lack of 
local cooperation. Local protection projects at Gardner, 
MA, Hartford, VT, and Wethersfield, CT authorized and 
constructed in accordance with Section 205 of 1948 Flood 
Control Act. Local protection project at Keene, NH authorized 
in accordance with Section 205 of 1948 Flood Control 
Act, is under construction. Emergency streambank erosion 
control projects at Brownsville, VT and Conway, MA 
authorized in accordance with Section 14 of the 1946 Flood 
Control Act were completed in 1987. (See Table 1-L at end 
of chapter for reservoirs and local protection works for 
Connecticut River Basin). Water Resources Development 
Act of 1986 modified the comprehensive plan for the control 
of flood-waters in the Connecticut River Basin, Vermont, 
New Hampshire, Massachusetts, and Connecticut, 
authorized by Section 5 of the Act of June 22, 1936 (49 Stat. 
1572) by authorizing the design, construction, operation, 
and maintenance of facilities at Townshend Dam, West 
River, Vermont to enable upstream migrant adult Atlantic 
salmon to bypass that dam and Ball Mountain Dam, Vermont, 
and to provide at both Townshend and Ball Mountain 
Dams facilities as necessary for the downstream 
passage of juvenile Atlantic salmon. The estimated 
project cost is $1,000,000. 
35A. BALL MOUNTAIN LAKE, VT 
Location. Dam is on West River, 29 miles above its 
junction with Connecticut River at Brattleboro, VT. It is 
2 miles north of village of Jamaica, VT. (See Geological 
Survey map for Londonderry, VT). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam and appurtenant 
works was initiated in May 1957 and completed in 
November 1961. Construction of initial recreation facilities 
was initiated in June 1975 and completed in June 1977. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. 
35B. BARRE FALLS DAM, MA 
Location. Dam is on Ware River in town of Barre, MA, 
31.9 miles above confluence of Ware and Swift Rivers. It 
is 13 miles, northwest of Worcester, MA. (See Geological 
Survey maps for Barre, MA, and Wachusett Mountain, 
MA). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam and appurtenant 
works was initiated in May 1956 and completed in 
May 1958. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. A contract to paint 
and repair flood control gates was awarded in August 1986 
and completed in September 1987. The contract amount 
was $63,436. A contract awarded in October 1986 for pavement 
repairs at two projects was completed in September 
1987. Total contract amount was $156,360. Pending final 
payment, $96,310 was the Barre Falls portion. The contract 
to repair the gatehouse masonry, awarded in May 1986, 
was 96 percent complete at fiscal year end. A contract 
for bridge restoration was awarded in August 1987. Work 
had not started at fiscal year end. 
35C. BEAVER BROOK, KEENE, NH 
Location. Keene is located in southwestern New 
Hampshire approximately 15 miles north of the Massachusetts 
border and 12 miles east of the Vermont border. 
Existing project. Consists of structural modifications 
to the outlet of the Three Mile Swamp and widening the 
1-14

NEW ENGLAND DIVISION 
Beaver Brook channel in the reach between Water Street 
and Marlboro Street. (See Table 1-B at end of chapter for 
Act authorizing existing project). 
Local cooperation. Fully complied with. 
Operations during fiscal year. New Work: Additional 
contract costs for construction completed last fiscal year 
have increased earnings to date to a total of $1,870,999. 
Final contract amount is still pending. 
35D. BIRCH HILL DAM, MA 
Location. Dam is on Millers River, 27.3 miles above its 
junction with the Connecticut River. It is 1.3 miles east of 
South Royalston, MA and 7.5 miles northwest of city of 
Gardner, MA. (See Geological Survey maps for Royalston 
and Winchendon, MA-NH and Templeton, MA). 
Existing project. For description of completed inprovement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam and appurtenant 
works was initiated in June 1940 and completed in 
February 1942. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Local interests have contributed $32,000 as their 
required 50 percent cost sharing of recreational development 
in accordance with 1965 Federal Water Project 
Recreation Act. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. A contract to repaint 
floodgates and replace gate seals was awarded in March 
1987 in the amount of $84,695. At fiscal year end the 
contract was 15 percent complete. 
35E. COLEBROOK RIVER LAKE, CT 
Location. Damsite is in town of Colebrook, Litchfield 
County, CT, on West Branch Farmington River about 3.9 
miles upstream from its confluence with Still River at 
Riverton, CT, and about 1.5 miles upstream from Goodwin 
(Hogback) Dam. (See Geological Survey map for 
Winsted, CT). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam and appurtenant 
works was initiated in May 1965 and completed in 
June 1969. Construction of recreation facilities was 
initiated in August 1969 and completed in June 1970. 
Local cooperation. Water supply contract was signed by 
Hartford Connecticut Metropolitan Water District. Repayment 
is being made in accordance with provisions of 1958 
Water Supply Act. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. A contract to 
replace the emergency generators at various locations was 
awarded in July 1987. Work had not started at fiscal year 
end. Another contract for pavement repairs at various 
locations was awarded in November 1986. The contract 
amount was $133,550 of which $30,845 is the Colebrook 
River Lake portion thru this fiscal year. 
35F. CONANT BROOK DAM, MA 
Location. Site is in south central part of Massachusetts 
in town of Monson. Damsite, across Conant Brook, is about 
2 miles southeast of community of Monson. (See Geological 
Survey map for Monson, MA). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam, highway 
relocations, and appurtenances was initiated in June 1964 
and completed in December 1966. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. 
35G. KNIGHTVILLE DAM, MA 
Location. Dam is on Westfield River, 27.5 miles above 
its confluence with Connecticut River. It is 4 miles north 
of town of Huntington, MA, and about 12 miles west of 
city of Northampton, MA. (See Geological Survey map 
for Westhampton, MA). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam and appurtenant 
works was initiated in August 1939 and completed 
December 1941. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. A contract to replace 
emergency generators at various locations was awarded in 
July 1987. Work had not started at fiscal year end. 
35H. LITTLEVILLE LAKE, MA 
Location. Dam is on Middle Branch of Westfield River, 
1 mile above its confluence with main stem of Westfield 
River and 25.2 miles above confluence of Westfield River 
with Connecticut River, in town of Chester. (See Geological 
Survey map for Chester, MA). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam and appurtenances 
was initiated under a multicomponent contract in 
June 1962 and completed in September 1965. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, and Title III, Water Supply Act of 1958 applies 
and fully complied with. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. A contract for pavement 
repairs was awarded in August 1986 and completed 
in June 1987. Contract amount was $149,164. 
35I. MILL BROOK, BROWNSVILLE, VT 
Location. The project is located along Mill Brook behind 
the Gleanor Grange Hall in the village of Brownsville, 
Vermont. The village is located in the town of West Wind- 
1-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
sor, Vermont in Windsor County, about 12 miles north of 
Springfield, Vermont and 9.5 miles northwest of Claremont, 
New Hampshire. 
Existing project. The streambank stabilization project 
consists of concrete grid block protection placed along 120 
feet of eroded streambank. The grid block is 8 inches thick, 
placed on a 1-foot gravel layer on a slope 1 vertical to 1- 
5 horizontal. The grid block is to be anchored 5 feet below 
the streambed and will extend approximately 8 feet above 
the channel bed. (See Table 1-B at end of chapter for Act 
authorizing existing project). 
Local cooperation. Provide without cost to the United 
States, all lands, easements, rights-of-way, and utility 
relocations necessary for project construction; hold and 
save the United States free from damages due to the 
construction, operation, and maintenance of the project, 
except where such damages are due to the fault or negligence 
of the United States or its contractors; maintain and 
operate the project after completion without cost to the 
United States; assume the resposibility for all costs in 
excess of the Federal limitation of $250,000; prevent future 
encroachment which might interfere with proper 
functioning of the project. 
Operations during fiscal year. New work: A construction 
contract was awarded last fiscal year in the amount 
of $48,735. Work began in June 1987 and continued thru 
September 1987. Ending fiscal year the contract was 77 
percent complete. 
35J. NORTH HARTLAND LAKE, VT 
Location. Dam is on Ottauquechee River, 1.5 miles above 
its junction with Connecticut River and 1 mile northwest 
of North Hartland, VT. Reservoir extends upstream 5.5 
miles. (See Geological Survey map for Hanover NH-VT). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam was initiated 
in June 1958 and completed in June 1961. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. 
35K. NORTH SPRINGFIELD LAKE, VT 
Location. Dam is in town of Springfield, VT, on Black 
River, 8.7 miles above its junction with Connecticut River, 
and 3 miles northwest of Springfield, VT. (See Geological 
Survey maps for Ludlow, VT and Claremont, NH). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam was initiated 
in May 1958 and completed in November 1960. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. The contract for 
remedial measures for seepage control, completed in June 
1986; required supplemental payments this fiscal year of 
$16,080. Final contract amount was $826,080. 
35L. OTTER BROOK LAKE, NH 
Location. Dam is on Otter Brook, 2.4 miles upstream 
from its junction with The Branch, which flows 2.5 miles 
to Ashuelot River at Keene. (See National Ocean Survey 
maps for Keene, NH-VT, and Monadnock, NH). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report 
for 1975. Project is complete. Construction of dam and 
appurtenant works was initiated in September 1956 and 
completed in August 1958. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. A contract for 
surface treatment of the access road, awarded last fiscal 
year, was completed in October 1986. Contract amount 
was $32,405. 
35M. RIVERDALE, 
WEST SPRINGFIELD, MA 
Location. The town of West Springfield is situated in 
southwestern Massachusetts about 90 miles west of 
Boston and 135 miles northwest of New York City, on the 
west bank of Connecticut River. Riverdale is in the northern 
portion of the town of West Springfield. 
Existing project. The plan of improvement involves 
the construction of approximately 12,700 feet of earth 
levee, two pumping stations and three stop-log storage 
structures. The levee provides protection against a flood 
greater than any of record reduced by the approved plan 
of reservoirs. The grades are all points above the maximum 
stage of the greatest flood of record, that of March 
1936. A modification authorized in 1987 calls for the expansion 
of the gravity outflow and pumping capacity of 
the existing Riverdale Pumping Station. This includes 
adding a 24-inch, diesel powered pump into the existing 
station. The proposed project also includes jacking a separate 
5-foot diameter, reinforced concrete culvert through 
the dike, running parallel to the existing culvert to increase 
the gravity outflow capacity. During emergenices, 
the gate could be operated manually from a new bridge 
and tower structure on the river side of the dike. An existing 
9-foot diameter culvert, about 400 feet downstream on 
Bagg Brook will be replaced with a realigned 8-foot x 13- 
foot corrugated metal arch and a 50-foot long transition 
aligned to tie smoothly into the existing downstream 
channel. Project cost estimate for the modification is 
$736,000. (See Table 1-B at end of chapter for Acts 
authorizing existing project). 
Local cooperation. Formal assurances have been 
requested. The local sponsor shall be solely responsible for 
operating, maintaining, replacing, and rehabilitating the 
project; provide, during the period of construction, a cash 
contribution of 5 percent of total project costs, currently 
estimated to be $36,800; provide all lands, easements, 
rights-of-way, and dredged material disposal areas, and 
perform all relocations and alterations of buildings, utilities, 
highways, sewers, and related and special facilities 
determined by the Government to be necessary for construction 
of the project, currently estimated to be $2,000; 
1-16

NEW ENGLAND DIVISION 
provide during the period of construction an additional 
cash contribution of 20 percent, presently estimated at 
$145,200, so that the total contribution equals 25 percent 
of total project costs; prescribe and enforce regulations to 
prevent obstruction of or encroachment on the project that 
would reduce the level of protection it affords, or that 
would hinder operation and maintenance; and the local 
sponsor will assume full responsibility for all project costs 
in excess of $5 million. 
Operations during fiscal year. New work: Work continued 
on the project design, the preparation of plans and 
specifications, and obtaining a water quality permit from 
the Commonwealth of Massachusetts. Coordination with 
the town of West Springfield continued toward completing 
the Local Cooperation Agreement. 
35N. SOUTH RIVER, CONWAY, MA 
Location. The South River originates below the Lower 
Reservoir in Ashfield, Massachusetts and joins the Deerfield 
River in Conway. The river is approximately 15 miles 
long and flows in a southeasterly direction through 
Conway. The town of Conway is located in Franklin County 
in western Massachusetts within the 655 square mile 
Deerfield River drainage basin. It is situated approximately 
five miles west of Interstate 91 between the communities 
of Greenfield and Shelburne Falls to its north, 
and Northampton to its south. 
Existing project. The plan at Site 2 calls for clearing 
and grubbing of the existing slope and refilling the 
eroded areas with compacted random fill. Slope protection 
consisting of a 3-foot thick uniform stone layer underlain 
by filter layers of 1-foot thick stone bedding and 1- 
foot thick gravel bedding would be placed on the random 
fill. The plan at Site 3 calls for clearing and grubbing the 
existing terraced slope and refilling the eroded areas 
with compacted random fill. Slope protection would be 
provided for the lower bank consisting of a 2-foot thick 
uniform stone layer underlain by a 1-foot thick gravel 
bedding layer and continuing to the top of the bank with 
loam and seed. (See Table 1-B at end of chatper for Act 
authorizing existing project). 
Local cooperation. Provide without cost to the United 
States all lands, easements, rights-of-way, and utility 
relocations necessary for project construction; hold and 
save the United States free from damages due to the 
construction, operation, and maintenance of the project, 
except where such damages are due to the fault or negligence 
of the United States or its contractors; maintain 
and operate the project after completion without cost to 
the United States; assume responsibility for all costs in 
excess of the Federal cost limitation of $250,000; prevent 
future encroachment which might interfere with proper 
functioning of the project. 
Operations during fiscal year. New work: The construction 
contract awarded last fiscal year was completed 
in May 1987. Final contract amount was $75,087. 
350. SURRY MOUNTAIN LAKE, NH 
Location. Dam is on Ashuelot River, 34.6, miles above 
its junction with Connecticut River and 5 miles north of 
Keene, NH. (See Geological Survey maps for Keene and 
Bellows Falls, NH-VT). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report 
for 1975. Project is complete. Construction of dam and 
appurtenant works was initiated in August 1939 and completed 
in June 1942. Initial phase of additional recreational 
facilities completed in September 1969, secondary 
phase in 1980. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. 
35P. TOWNSHEND LAKE, VT 
Location. Dam is on West River, 19.1 miles above its 
junction with Connecticut River at Brattleboro, VT, and 
about 2 miles west of Townshend, VT. Reservoir extends 
upstream about 4 miles. (See Geological Survey maps for 
Saxtons River, VT, and Londonderry, VT). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam and appurtenant 
works was initiated in November 1958 and completed 
in June 1961. Initial phase of additional recreational 
facilities completed in October 1969. Secondary phase completed 
in September 1971. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. The contract 
awarded last fiscal year to replace the emergency 
generator was completed in February 1987. Contract 
amount was $42,213. Another contract awarded last fiscal 
year for pavement repairs in the recreation area was 
completed in October 1986. Final contract amount was 
$43,384. A contract for pavement repairs, awarded in July 
1987, in the amount of $98,333, was 32 percent complete 
at fiscal year end. Another contract for pavement repairs 
was awarded in July 1987 but work had not started at fiscal 
year end. 
35Q. TULLY LAKE, MA 
Location. Dam is on East Branch of Tully River, 3.9 
miles above its junction with Millers River. It is 1 mile 
north of Fryville, MA and 3.5 miles north of Athol, MA. 
(See Geological Survey map for Royalston, MA-NH). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report 
for 1975. Project is complete. Construction of dam and 
appurtenant works was initiated in March 1947 and 
completed in September 1949. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Local interests must also bear 50 percent of future 
recreational development, in accordance with 1965 
Federal Water Project Recreational Act. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. A contract for 
1-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
pavement repairs at various locations was awarded in 
October 1986 and completed in September 1987. Contract 
amount was $156,360. Pending final payment, $50,243 
was the Tully Lake portion. Another contract to repaint 
the floodgates and replace gate seals was awarded in April 
1987 and completed in September 1987. The contract 
amount was $39,850. 
35R. UNION VILLAGE DAM, VT 
Location. Dam is on Ompompanoosuc River, 4 miles 
above its junction with Connecticut River. It is one-fourth 
mile north of Union Village, VT and 11 miles north of 
White River Junction, VT. (See Geological Survey maps 
for Strafford, VT and Mount Cube, NH-VT). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam was initiated 
in March 1947 and completed in June 1950. 
Local Cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. 
35S. WEST SPRINGFIELD, MA 
Location. The West Springfield local protection works 
are located in the town of West Springfield, MA. The 
project is on the west bank of the Connecticut River, 76 
miles above its mouth. (See Geological Survey maps for 
Springfield South and West Springfield, MA-CT). 
Existing project. This project consists of a system of 
earth levees and concrete floodwalls approximately 24,500 
feet in length. The system starts at high ground, in the 
vicinity of Harrison Place, and extends downstream 
along the Connecticut River and up the north bank of the 
Westfield River to high ground at the Boston & Albany 
Railroad. The work involved raising 13,700 feet of existing 
levee, constructing 2,300 feet of floodwall, improving 2,400 
feet of river bank, and treating 6,100 feet of existing levee 
foundation. Three pumping stations with appurtenant 
drainage facilities were also constructed for the disposal 
of interior drainage. The project, with the approved plan 
of reservoirs, is designed to protect against a flood greater 
than any of record. The levee and floodwall grades are, at 
all points, above the maximum stage of the greatest flood 
of record, that of March 1936. 
A modification to the project was authorized in October 
1982 providing for the raising of the floodwall sections by 
one foot and the provision of a flood forecasting system. 
The project is a unit of the comprehensive plan of flood 
control and other purposes in the Connecticut River Basin 
and was authorized by the Flood Control Act approved 
June 28, 1938. The project is complete. Construction of 
the prior project work was initiated in March 1939 and 
completed in July 1942 with the exception of foundation 
treatment along the Westfield River south of Agawam 
Bridge, which was initiated in May 1947 and completed 
in November 1947, and relief well and drainage system, 
which was initiated in August 1952 and completed in July 
1953. (See Table 1-B at end of chapter for Acts authorizing 
existing project). 
Local cooperation. Fully complied with. 
Operations during fiscal year. New work: Local 
interests continued aquisition of easements needed for 
installation of field equipment that will become part of 
flood warning system. 
36. GULF STREET, MILFORD, CT 
Location. The city of Milford, is located in the southwest 
corner of New Haven County, in southwestern Connecticut. 
The erosion site at Gulf Street is located immediately 
to the southeast of Milford Harbor and the site at 
Trumbull Avenue is located immediately to the southwest 
of Milford Harbor. 
Existing project. Shoreline protection measures will 
consist of construction of stone slope protection for the 140- 
foot long reach of shoreline, roadway and associated utilities. 
(See Table 1-B at end of chapter for Act authorizing 
existing project). 
Local cooperation. Provide without cost to the United 
States all lands, easements, rights-of-way and utility relocations 
necessary for project construction; hold and save 
the United States free from damages due to the construction, 
operation and maintenance of the project, except 
where such damages are due to the fault or negligence of 
the United States or its contractors; maintain and operate 
the project after completion without cost to the United 
States; assume responsibility for all costs in excess of the 
Federal cost limitation of $250,000; prevent future 
encroachment which might interfere with proper functioning 
of the project. 
Operations during fiscal year. New work: The construction 
contract, awarded last fiscal year in the amount 
of $174,200, was completed in August 1987. Final contract 
cost is pending determination of final quantities. 
37. HOUSATONIC RIVER BASIN, 
CT and MA 
Seven flood control reservoirs on tributatries of the 
Naugatuck River, principal tributary of the Housatonic 
River, and three local protection projects have been specifically 
authorized as part of an overall plan for flood control 
in the Housatonic River Basin. The Naugatuck and Housatonic 
Rivers converge 12 miles above mouth of Housatonic 
River. A project for emergengy snagging and clearing of 
the Blackberry River, a tributary of the Housatonic River, 
was authorized under authority contained in Section 208 
of the 1954 Flood Control Act. Emergency bank protection 
projects at: Alford, Green River, MA; Sheffield, MA; 
Salisbury, CT; and Squantz Pond, Fairfield, CT were 
authorized under authority provided by Section 14 of the 
1948 Flood Control Act. Projects for local flood protection 
for: West Branch, Torrington, CT; East Branch, Torrington, 
CT; Pittsfield, MA; and Waterbury - Watertown, CT 
1-18

NEW ENGLAND DIVISION 
were authorized under authority provided by Section 205 
of the 1948 Flood Control Act. (See Table 1-M on dams, 
reservoirs, and local protection projects for Housatonic 
River Basin). 
37A. BLACK ROCK LAKE, CT 
Location. Damsite is on Branch Brook about 2 miles upstream 
from its confluence with Naugatuck River in towns 
of Thomaston and Watertown, CT. (See Geological Survey 
map for Thomaston, CT). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Road relocation completed in 
November 1967. Contract for construction of dam and 
appurtenances was awarded in July 1967 and completed 
in July 1971. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. However, local interests must establish encroachment 
lines downstreaam of dam to permit efficient reservoir 
operation. State legislation requires establishment of 
such lines. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. A contract for pavement 
repairs at various locations was awarded in November 
1986. The contract amount was $133,550, of which 
$19,999 was the Black Rock Lake portion thru this fiscal 
year. 
37B. COVERED BRIDGE, HOUSATONIC 
RIVER, SHEFFIELD, MA 
Location. The town of Sheffield is located in the southwestern 
corner of Berkshire County, Massachusetts, 
approximately 7.5 miles east of the Massachusetts - New 
York state line and about 4.2 miles north of the Massachusetts 
- Connecticut state line. 
Existing project. Construct a 70-foot long stone apron 
to protect the slopes and bottom of the bridge channel. Also, 
a total of approximately 500 linear feet of riprap to be 
located upstream and downstream from the bridge on both 
riverbanks. (See Table 1-B at end of chapter for Act authorizing 
existing project). 
Local cooperation. Fully complied with. 
Operations during fiscal year. New work: A construction 
contract awarded last fiscal year was started in October 
1986 and continued thru September 1987. Contract 
costs thru September 1987 were $162,382. 
37C. HANCOCK BROOK LAKE, CT 
Location. Dam is on Hancock Brook in town of Plymouth, 
CT, about 3.4 miles above its confluence with Naugatuck 
River. (See Geological Survey map for Waterbury, CT). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam and appurtenant 
structures was initiated in July 1963 and completed 
in August 1966. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. However, local interests must establish encroachment 
lines downstream of dam to permit efficient reservoir 
operation. State legislation requires establishment of 
such lines. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. 
37D. HOP BROOK LAKE, CT 
Location. Damsite is on Hop Brook in city of Waterbury 
and towns of Middlebury and Naugatuck, CT, about 1.4 
miles upstream of confluence of Naugatuck River and Hop 
Brook. (See Geological Survey map for Waterbury, CT). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam and appurtenant 
structures was initiated in December 1965 and 
completed in December 1968. Construction of a public use 
facility was completed in November 1973. Construction of 
an additional restroom was completed in 1980. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. However, local interests must establish encroachment 
lines downstream of dam to permit efficient reservoir 
operation. State legislation requires establishment of 
such lines. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. 
37E. NORTHFIELD BROOK LAKE, CT 
Location. Dam is on Northfield Brook about 1.3 miles 
upstream from its confluence with Naugatuck River, in 
town of Thomaston, CT. (See Geological Survey map for 
Thomaston, CT). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam and appurtenances 
was initiated in May 1963 and completed in 
October 1965. Construction of recreation facilities was 
initiated in November1966 and completed in August 1967. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. However, local interests must establish encroachment 
lines downstream of dam to permit efficient reservoir 
operation. State legislation requires establishment of 
such lines. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. 
37F. THOMASTON DAM, CT 
Location. On Naugatuck River about 30.4 miles above 
its junction with Housatonic River and about 1.6 miles 
north of Thomaston, CT. Reservoir extends upstream about 
6.4 miles. (See Geological Survey map for Thomaston, CT). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam and appurtenant 
works was started in May 1958 and completed in 
November 1960. 
Local cooperation. Section 3, Flood Control Act of 1944 
applies 
1-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. A contract to repaint 
the access and service bridges was awarded in May 1987 
and completed in August 1987. Contract amount was 
$24,480. A contract for pavement repairs at various locations 
was awarded in November 1986. The contract amount 
was $133,550, of which $49,580 was the Thomaston Dam 
portion thru this fiscal year. 
38. MACHIAS RIVER, MACHIAS, ME 
Location. The town of Machias is a coastal community 
located about 83 miles east of Bangor, Maine and 46 miles 
southwest of the U.S. - Canadian border town of Eastport, 
Maine. 
Existing project. The plan calls for the construction of 
250 linear feet of stone slope protection along the north 
bank of the river, adjacent to the municipal parking lot. 
The project includes a 50-foot extension upstream of the 
municipal parking lot to tie the upstream end of the stone 
protection into stable natural banking. Project is 
complete. (See Table 1-B at end of chapter for Act authorizing 
existing project). 
Local cooperation. Provide without cost to the United 
States all lands, easements, rights-of-way and utility 
relocations necessary for project construction, estimated 
to be $2,000; hold and save the United States free from 
damages due to construction, operation and maintenance 
of the project, except where such damages are due to the 
fault or negligence of the United States or its contractors; 
maintain and operate the project after completion without 
cost to the United States; assume responsibility for all 
costs in excess of the Federal cost limitation of $250,000; 
prevent future encroachment which might interfere with 
proper functioning of the project. 
Operations during fiscal year. New work: A construction 
contract in the amount of $115,220 was awarded in 
September 1986 and completed in June 1987. 
39. MARGINAL WAY, OGUNQUIT, ME 
Location. The town of Ogunquit is located within York 
County along the coast of southern Maine about 15 miles 
north of Portsmouth, New Hampshire and 40 miles 
southwest of Portland, Maine. Marginal Way is a public 
footpath that starts near the center of town and follows the 
edge of the ocean atop rugged cliffs to Perkins Cove. The 
walkway is about a mile and a half long and was constructed 
in 1926. 
Existing project. Construction of 240 linear feet of 42- 
inch thick stone slope protection along the unprotected 
portion of the walkway which is adjacent to and just north 
of the rebuilt section. Project is complete. (See Table 1-B 
at end of chapter for Act authorizing existing project). 
Local cooperation. Provide without cost to the United 
States all lands, easements, rights-of-way, and utility relocations 
necessary for project construction, estimated to be 
$2,000; hold and save the United States free from damages 
due to the construction and maintenance of the project, 
except where such damages are due to the fault or negligence 
of the United States or its contractors; maintain the 
project after completion without cost to the United States; 
assume responsibility for all costs in excess of Federal cost 
limitation of $250,000; insure that erosion conditions along 
portions of Marginal Way, outside the limits of the proposed 
Corps project, are protected and properly maintained; 
maintain Marginal Way as a public walkway. 
Operations during fiscal year. New work: The construction 
contract awarded last fiscal year was completed 
in April 1987. Final contract amount was $193,590. 
40. MERRIMACK RIVER BASIN, 
NH AND MA 
Works covered by comprehensive plan are on Merrimack 
River and its tributaries in New Hampshire and 
Massachusetts. Flood Control Act of 1936 authorized 
construction of a system of flood control reservoirs in 
Merrimack River Basin for reduction of flood heights in 
Merrimack Valley. Flood Control Act of 1938 approved 
general comprehensive plan for flood control and other 
purposes as approved by Chief of Engineers pursuant to 
preliminary examinations and surveys authorized by Act 
of June 22, 1936, and modified project to provide in 
addition to construction of a system of flood control reservoirs, 
related flood control works which may be found 
justified by the Chief of Engineers. All operations pertaining 
to flood control in Merrimack River Basin are now 
carried on under and reported under projects for individual 
units of comprehensive plan referred to above. No further 
expenditures are contemplated under general project 
for flood control in Merrimack River Basin. For final cost 
and financial summary, see Annual Report for 1946. 
A comprehensive plan for development of water resources 
of the North Nashua River Basin, a principal tributary 
of the Merrimack River, was authorized by 1966 
Flood Control Act substantially in accordance with Senate 
Document 113, 89th Congress. Plan provides for construction 
of coordinated system for four reservoirs and three 
local protection projects for flood protection, water supply, 
recreation and allied purposes. Water Resources Development 
Act of 1986 deauthorized two of the reservoirs and 
one of the local protection projects. 
The 1966 Flood Control Act also authorized construction 
of Saxonville local protection project substantially in 
accordance with Senate Document 61, 89th Congress. An 
emergency bank protection project at Amesbury, MA was 
authorized under authority provided by Section 14 of the 
1948 Flood Control Act. (See Table 1-N at end of chapter 
for reservoirs and related flood control works for Merrimack 
River Basin). 
40A. BLACKWATER DAM, NH 
Location. Dam is on Blackwater River, NH, 8.2 miles 
above confluence with Contoocook River and 118.8 miles 
above mouth of Merrimack River. It is in the town of 
Webster, just above village of Swetts Mills, 12.5 miles by 
highway northwest of Concord, NH. (See Geological Survey 
maps for Penacook and Mount Kearsarge, NH). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete except for construction of public 
facilities. Construction of dam and appurtenant works was 
initiated in May 1940 and completed in November 1941. 
1-20

NEW ENGLAND DIVISION 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. The contract to replace 
the emergency generator at three damsites, awarded 
last fiscal year, was completed in December 1986. Total 
contract amount was $69,663, of which $20,700 was the 
Blackwater Dam portion thru this fiscal year. 
40B. EDWARD MACDOWELL LAKE, NH 
Location. Dam is on Nubanusit Brook, a tributary of 
Contoocook River, one-half mile upstream from village of 
West Peterborough, NH, and 14 miles east of Keene, NH. 
(See Geological Survey map for Peterboro and Manadnock, 
NH). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Comstruction of dam and appurtenant 
works was initiated in March 1948 and completed 
in March 1950. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. The contract 
awarded last fiscal year to repaint the service bridge and 
floodgate was completed in August 1987. Contract amount 
was $22,000. A contract was awarded in July 1987 to 
resurface the access road and was 70 percent complete at 
fiscal year end. 
40C. FRANKLIN FALLS DAM, NH 
Location. Dam is on Pemigewasset River, NH, main 
tributary of Merrimack River, and about 2/2 miles upstream 
of Franklin, NH. (See Geological Survey maps for 
Penacook and Holderness, NH). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report 
for 1975. Project is complete. Construction of dam and 
appurtenant works was initiated in November 1939 and 
completed in October 1943. 
Local cooperation. Section 2, Flood Control Act of 
1938 applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. A contract to 
replace the gatehouse roof was awarded in September 
1987. Work had not started at close of fiscal year. 
40D. HOPKINTON-EVERETT LAKES, 
NH 
Location. Hopkinton Dam is on Contoocook River, NH, 
17.3 miles above its junction with Merrimack River and 
about one-half mile upstream from village of West Hopkinton. 
Everett Dam is on Piscataquog River, NH, 16 
miles above its junction with Merrimack River and about 
1.3 miles southeast of village of East Weare. Two interconnecting 
canals were provided to enable the two reservoir 
areas to function as one. (See Geological Survey map 
for Hillsboro, NH, and Concord, NH). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report 
for 1975. Project is complete. Construction of two dams 
and appurtenant works was initiated in November 1959 
and completed in December 1962. Construction of 
recreation facilities was initiated in November 1974 and 
completed in September 1975. 
Local cooperation. Section 2, Flood Control Act of 
1938 applies. Local interests must also bear 50 percent of 
future recreational development in accordance with 1965 
Federal Water Project Recreation Act. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. The contract 
awarded last fiscal year to replace the emergency generator 
at three damsites was completed in December 1986. 
The contract amount was $69,663 of which $9,334 was the 
Hopkinton-Everett Lakes portion thru this fiscal year. A 
contract was awarded in July 1987 for restroom renovations. 
Work had not started at close of fiscal year. 
41. NEW BEDFORD, FAIRHAVEN, AND 
ACUSHNET, MA 
Location. Main harbor barrier is across New Bedford 
and Fairhaven Harbor in vicinity of Palmer Island. 
Supplemental dikes and walls are provided in Clark Cove 
area of New Bedford and Fairhaven. (See Geological 
survey maps for New Bedford North, New Bedford South, 
Marion, and Sconticut Neck, MA and National Ocean 
Survey Charts 13230, 13070 and 13218). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of barrier and appurtenances 
was initiated in October 1962 and completed 
in January 1966. Construction of the pumping station was 
initiated in October 1962 and completed in June 1964. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Maintenance: Operating 
costs included $100,600 for project operations and 
$17,600 for administrative activities. 
42. NEW LONDON, CT 
Location. In the city of New London, CT, about 45 miles 
southeast of Hartford, CT, and 50 miles southwest of 
Providence, RI. (See Geological Survey map for New 
London, CT). 
Existing project. The hurricane protection project 
consists of approximately 715 feet of rock-faced earthfill 
dike and 800 feet of I-walls around the northerly shore of 
Shaw Cove and the regrading of approximately 21 acres 
of land along the west shore of the cove to elevation 12.5 
feet mean sea level. Top of dike and floodwalls will be 14.5 
feet mean sea level. Appurtenant structures will include 
a street gate, pressure conduit and a pumping station to 
discharge interior drainage. Last estimate (December 
1984) for the project is $11,560,000 for construction and 
$1,140,000 for lands and damages including relocations, 
a total of $12,700,000 for new work. Total includes local 
1-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
costs of $1,140,000 for lands and relocations and a 
$2,310,000 cash contribution. (See Table 1-B at end of 
chapter for Act authorizing existing project). Project is 
under construction and is approximately 99 percent 
complete. 
Local cooperation. Local interests must: (a) Provide 
lands and rights-of-way for construction; (b) make alterations 
and relocations; (c) bear 30 percent of construction 
cost with credit allowed for (a) and (b); (d) hold the United 
States free from damages; and (e) maintain and operate 
all works. Assurances have been provided. 
Operations during ficscal year. New work: Administrative 
closeout of Part VI contract continued. Continued 
efforts to obtain values for project real estate from city of 
New London in order to ascertain appropriate project 
cost-sharing. The city still has not provided the required 
information. 
43. PLEASANT POINT, PERRY, ME 
Location. The town of Perry is located within Washington 
County along the coast of northeastern Maine about 
126 miles east of Bangor, Maine and 20 miles south of 
Calais, Maine. 
Existing project. The project consists of 800 linear feet 
of stone slope protection. The stone is placed on a slope of 
1 vertical to 2 horizontal and extends from mean high tide 
up to the height of expected storm wave runup. A gravel 
walkway will run along the top of the stone protection. 
Project is complete. (See Table 1-B at end of chapter for 
Act authorizing existing project). 
Local cooperation. Provide without cost to the United 
States, all lands, easements, rights-of-way, and utility 
relocations necessary for project construction; hold and 
save the United States free from damages due to the 
construction, operation and maintenance of the project, 
except where such damages are due to the fault or 
negligence of the United States or its contractors; maintain 
and operate the project after completion without cost 
to the United States; prevent future encroachment which 
might interfere with proper functioning of the project. 
Operations during fiscal year. New work: The construction 
contract awarded last fiscal year was completed 
in June 1987. Final contract amount was $123,418. 
44. ROUGHANS POINT, REVERE, MA 
Location. The city of Revere is located in Suffolk 
County on the Massachusetts coast about 2 miles 
northeast of the East Boston section of the city of Boston. 
Roughans Point is a low-lying, ocean front area of Revere. 
The area has 55 acres which lie below elevation 10 feet 
NGVD. 
Existing project. Consists of stabilizing the existing 
facilities along the shore with a 4,080-foot long armor 
stone revetment to dissipate incoming waves. The revetment 
would extend from a point 400 feet north of Eliot 
Circle southerly to a point 200 feet south of the intersection 
of Winthrop Parkway and Leverett Avenue. The plan 
also calls for "backwater" protection by constructing an 
earth berm one foot high and 200 feet long on the existing 
median strip between Bennington Street and State Road. 
Interior drainage improvements consist of a new intake 
structure at the existing pump station, a new gravity 
drain and two sluice gates. The total estimated project 
cost (October 1986) is $9,400,000. (See Table 1-B at end of 
chapter for Act authorizing existing project). 
Local cooperation. Formal assurances have not been 
requested. Local interests must provide without cost to 
the United States all lands, easements, and rights-of-way 
necessary for construction of the structural elements of 
the project, including ponding areas, borrow areas, and 
disposal areas for excavated material; hold and save the 
United States free from damages due to construction, 
operation, and maintenance of the project, not including 
damages due to the fault or negligence of the United 
States or its contractors; bear all costs of operation, maintenance 
and replacements, presently estimated at $13,000 
annually; pay 35 percent of project costs allocated to 
storm damage reduction, presently estimated at 
$3,290,000; provide and maintain necessary access roads, 
parking areas, and other public use facilities, open and 
available to all on equal terms; accomplish without cost 
to the United States all alterations and relocations of 
buildings, streets, storm drains, utilities, highway 
bridges, and other structures made necessary by construction 
of the project; and prior to initiation of construction 
prescribe and enforce regulations to prevent 
obstruction or encroachment on the interior ponding 
easment areas. 
Operations during fiscal year. New work: Work included 
subsurface exploration, wave analysis and initiation 
of project design as part of the General Design 
Memorandum (GDM). 
45. SAINT JOHN RIVER BASIN, ME 
Comprehensive plan for water resources development 
within the basin was comprised of the multiple-purpose 
Dickey and Lincoln School Reservoirs on the upper Saint 
John River. Projects were authorized by Flood Control 
Act of 1965 substantially in accordance with plans included 
in report of Department of Interior and Corps of 
Engineers dated August 1964 which is supplement to 
July 1963 report of International Passamaquoddy Tidal 
Power Project and Upper Saint John River Hydroelectric 
Power Development. The Dickey Dam component of the 
project was deauthorized by Public Law 97-128 on 29 
December 1981 and the project in its entirety was 
deauthorized by the Water Resources Development Act of 
1986 (Public Law 99-662) on November 17, 1986. Local 
protection project at Fort Kent authorized by Chief of 
Engineers on September 25, 1975 in accordance with 
Section 205 of 1948 Flood Control Act. (See Table 1-F at 
end of chapter for authorized multiple-purpose projects 
including power). 
46. STAMFORD, CT 
Location. In Fairfield County on north shore of Long 
Island Sound, about 30 miles east of New York City and 
20 miles southwest of Bridgeport, CT. (See Geological 
Survey map for Stamford, CT). 
1-22

NEW ENGLAND DIVISION 
Existing project. For description of completed improvement 
see Annual Report for 1974. (See Table 1-B at 
end of chapter for Act authorizing existing project). Project 
was completed in 1969. Local interests still owe a 
substantial amount based on claims settlements, including 
interest payment under the Contract Disputes Act. 
Local cooperation. Local interests will provide lands, 
easements, and rights-of-way; make modifications to 
existing storm drainage system which may be required to 
obtain full benefits of protection plan, all necessary modifications 
to existing sanitary sewer facilities required to 
prevent entry of tidal-waters, and all changes, alterations 
and additions to or relocations of any buildings and utilities 
made necessary by construction of project; bear 30 
percent of total first cost, estimated at $4,340,000 and 
consisting of cost items listed above plus a cash contribution 
estimated at $3,150,000; contribute in cash, in lieu of 
cost of annual maintenance and operation of tidal portion 
of East Branch barrier which is to be operated and 
maintained by the United States, an amount estimated at 
$880,000; maintain and operate all works after completion 
with exception of tidal portion of East Branch barrier 
and aids to navigation; and hold the United States 
free from damages. Assurances received and cash contributions 
have been deposited except for $662,000 
outstanding which is local share of final claims settlement 
including interest payment. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. New work: A 
strong request was again made to the city of Stamford 
for payment of the $662,000 still outstanding as a result 
of claims settlement. 
47. THAMES RIVER BASIN, CT, 
RI, AND MA 
Works covered by this plan are a series of dams and 
reservoirs on tributaries of Thames River in Massachusetts 
and Connecticut, within a radius of 45 miles from 
Norwich, CT, and a channel enlargement on Shetucket 
River where it discharges into Thames River at Norwich. 
Flood Control Act of August 18, 1941, approved plan for 
a system of reservoirs and channel improvements in 
Thames River Basin in accordance with House Document 
885, 76th Congress, 3rd session, and authorized $6 million 
for initiation and partial accomplishment of project. 
Flood Control Act of December 22, 1944, authorized completion 
of approved plan. Flood Control Act of July 14, 
1960, authorized project for West Thompson Reservoir, 
substantially as recommended in Senate Document 41, 
86th Congress, 2nd session. (See Table 1-0 at end of chapter 
on reservoirs and local protection districts, Thames 
River Basin, for projects comprising approved plan). 
47A. BUFFUMVILLE LAKE, MA 
Location. Dam is on Little River, 1.3 miles above its 
junction with French River and 8 miles northeast of 
Southbridge, MA. Reservoir extends upstream about 1.7 
miles northerly and 1.9 miles southerly. (See Geological 
Survey maps for Webster, MA and CT, and Leicester, 
MA). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report 
for 1975. Project is complete. Construction of dam and 
appurtenant works was initiated in September 1956 and 
completed 1958. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. 
47B. EAST BRIMFIELD LAKE, MA 
Location. Dam is on Quinebaug River, 64.5 miles above 
its confluence with Shetucket River and 1 mile southwest 
of village of Fiskdale, MA. (See Geological Survey maps 
for Whales, MA and CT, Southbridge, MA and CT, East 
Brookfield, MA, and Warren, MA). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam and appurtenant 
works was initiated in May 1958 and completed in 
June 1960. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. The contract 
awarded last fiscal year to replace the emergency generator 
was completed in November 1986. Final contract 
amount was $24,500. 
47C. HODGES VILLAGE DAM, MA 
Location. Dam is on French River, 15 miles above its 
confluence with Quinebaug River, at Hodges Village in 
town of Oxford, MA, about 5 miles north of Webster, MA. 
(See Geological Survey maps for Webster, MA, and CT, 
Leicester, MA, Worcester South, MA, and Oxford, MA). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report 
for 1975. Project is complete. Construction of dam and 
appurtenant works, initiated in March 1958, was 
completed in December 1959. 
Local cooperation. Section 2, Flood Control Act of 
1938 applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. A contract for 
pavement repairs was awarded in July 1987. Work had 
not started at fiscal year end. 
47D. MANSFIELD HOLLOW LAKE, CT 
Location. Dam is at Mansfield Hollow, CT, on Natchaug 
River, 5.3 miles above its confluence with Willimantic 
River. It is 4 miles northeast of city of Willimantic, CT. 
(See Geological Survey maps for Spring Hill and 
Willimantic, CT). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam, initiated in 
1949, was completed in May 1952. 
1-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. A contract for 
pavement repairs to the access road was awarded in May 
1987 and completed in August 1987. Final contract amount 
was $24,185. 
47E. WEST THOMPSON LAKE, CT 
Location. Dam is on Quinebaug River in town of Thompson, 
CT. Site is in village of West Thompson, 2 miles 
upstream from city of Putnam, CT. (See Geological Survey 
map, for Putnam, CT). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam, road relocation, 
and appurtenances was initiated in August 1963 
and completed in October 1965. Initial phase of recreation 
facilities was completed in May 1976. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. The contract 
awarded last fiscal year for construction of a storage building 
was completed in December 1986. Final contract 
amount was $57,960. 
47F. WESTVILLE LAKE, MA 
Location. Dam is on Quinebaug River, 56.7 miles above 
its confluence with Shetucket River, in towns of Sturbridge 
and Southbridge, MA, and 1.3 miles west of center 
of Southbridge. (See Geological Survey maps for Southbridge, 
MA and RI, and East Brookfield, MA). 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report for 
1975. Project is complete. Construction of dam and appurtenant 
works was initiated in April 1960 and completed in 
August 1962. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance activities. A contract to repaint 
the floodgates was awarded in April 1987 and completed 
in September 1987. Final contract amount was $68,850. 
48. TOWN BROOK, QUINCY and 
BRAINTREE, MA 
Location. The project is located in the city of Quincy 
and the town of Braintree on the south side of Massachusetts 
Bay, along the eastern shore of Massachusetts, 7 
miles south of Boston in Norfolk County. The watershed 
is approximately 4.5 square miles. 
Existing project. Provides for the construction of a 12- 
foot diameter, 4,060-foot long, concrete lined tunnel in 
bedrock approximately 190 feet below ground, intake and 
outlet structures, and improvements to the Town River 
downstream of the outlet shaft. New reinforced concrete 
box outlets will be constructed under the Southern 
Artery and an adjacent automobile dealer parking lot. In 
conjunction with this, the left bank of the Town River 
below the Southern Artery will be widened to provide 
sufficient channel capacity. The tunnel and its appurtenances 
will be supplemented by modifications to the Old 
Quincy Reservoir Dam, located at the headwaters of 
Town Brook which will include a new spillway and outlet 
structure. The estimated total project cost (October 1986) 
is $28,400,000. (See Table 1-B at end of chapter for Act 
authorizing existing project). 
Local cooperation. Formal assurances have not been 
requested. Local interests are required to provide all 
lands, easements, and rights-of-way, presently estimated 
at $250,000; provide safety modifications to Old Quincy 
Dam to insure its structural integrity, presently estimated 
at $270,000; pay a cash contibution of 23 percent 
of the costs allocated to flood control, presently estimated 
at $6,580,000 so that the total contribution of local interests 
is equal to 25 percent of costs allocated to flood control; 
and bear all costs of operation, maintenance, and 
replacements, presently estimated at $8,400 annually. In 
addition, local interests must do the following, for which 
there is no estimate of cost: prescribe and enforce regulations 
to prevent encroachment on both the improvements 
and unimproved channels, and manage all projectrelated 
channels to preserve capacities for local drainage 
as well as for project functions. 
Operations during fiscal year. New work: The 
feature Design Memorandum (DM) on the tunnel, 
conduits, and shafts was approved by Chief of Engineers 
in November 1986. The last planned feature Design 
Memorandum for the project (the Old Quincy Dam 
reconstruction) was completed and approved in June 
1987. Revised plans and specifications for the Town River 
improvements were essentially completed and were 
coordinated with the MDC, applicable utilities, and the 
city of Quincy. 
49. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
In accordance with provisions of the Flood Control Act 
of 1936. as amended, local flood protection works constructed 
with Federal funds are transferred to local 
interests to operate and maintain. To insure compliance 
with regulations prescribed for their operation and maintenance, 
regular inspections of the following projects 
were made during the fiscal year: 
CONNECTICUT: October 1986 and May 1987 - 
Ansonia, Derby, East Hartford, Hartford, New London, 
Pawcatuck, Stamford; April 1987 - Bridgeport, Colchester/
East Hampton, East Branch, Hall Meadow, Mad 
River, North Canaan, Salisbury, Sucker Brook, Torrington, 
Waterbury, Winsted, Woodbury; May 1987 - Danbury, 
New Fairfield, Norwalk, Wethersfield. 
MAINE: May 1987 - Beals, Blaine, Castine, Cherryfield, 
Fort Kent, Harpswell, Hartland, Indian Island, 
Islesboro, Lubec, Whiting. 
MASSACHUSETTS: October 1986 and April 1987 - 
Gardner, Haverhill, Lowell, Springfield; October 1986 
and May 1987 - Charles River Dam, Fitchburg, Holy- 
1-24

NEW ENGLAND DIVISION 
oke, Northampton, Saxonville, West Springfield; April 
1987 - Alford, Canton, Huntington, Lancaster, Lee, 
Pittsfield, Scituate, Sheffield, Three Rivers, West 
Warren, Worcester; May 1987 - Amesbury, Blackstone, 
Chicopee, Hayward Creek, Millbury, Quincy, Ware, 
Weymouth-Braintree. 
NEW HAMPSHIRE: October 1986 - Beaver Brook, 
Keene; October 1986 and May 1987 - Nashua; April 1987 
- Lincoln, Shelburne, Wilton; May 1987 - Charlestown, 
Farmington, North Stratford, West Stewartstown. 
RHODE ISLAND: October 1986 and April 1987 - 
Woonsocket. 
VERMONT: April 1987 - Weston; May 1987 - 
Saxtons River. 
50. FLOOD CONTROL 
RESERVOIR OPERATIONS 
A coordinated system of reservoirs, many of which are 
multipurpose in nature and all containing significant 
amounts of storage for flood control purposes, has been 
established in five major flood producing basins in New 
England. During periods of flood flows, regulation of 
reservoirs is fully coordinated within each basin dependent 
upon its location in the watershed, its available storage 
capacity and origin of the flood. In addition to flood 
control releases, water supply, flow augmentation and 
hydropower releases were made from selected reservoirs. 
During the period 31 March to 8 April 1987, a pair of 
intense rainstorms hit most of New England, causing 
major flooding in Connecticut, Massachusetts, New 
Hampshire, Vermont and Maine. These two storms, 
augmented by snowmelt in the mountains and northern 
areas, resulted in the most widespread flooding in about 
50 years. The storms created two separate and significant 
flood peaks, especially in southern and central regions. 
Basin conditions prior to the flooding were the result of 
minimal precipitation and sunny, clear weather during 
February and March. This resulted in a substantial reduction 
of snow cover throughout New England from the nearrecord 
highs of late January, and was especially true in 
southern New England where the snow pack had mostly 
disappeared. However, significant amounts of snow still 
remained in higher elevations of western Massachusetts 
and Connecticut and the hilly and mountainous areas of the 
three northern states. In the week before the first storm, 
windy and sunny weather reduced water content in the 
snow pack by 2 to 3 inches in the Connecticut River Basin 
and up to 3 inches in the Merrimack River Basin. This 
condition increased flows on the mainstems of the 
Merrimack and Connecticut Rivers to about 40 to 50 percent 
of channel capacity on 30 March. 
Flood control gates at Corps reservoirs were throttled to 
minimum releases on 30 March, as a precautionary measure 
to a forcasted storm. During the next two days an 
extremely intense storm system buffeted the entire New 
England area with heavy rainfall, strong southerly winds 
and temperatures in the fifties and sixties. Precipitation 
totals amounted to 3 to 5 inches of rain in southern and 
coastal areas and 2 to 3 inches over much of northern New 
England with its remaining snowpack containing 3 to 5 
inches of water equivalent. 
This rainfall caused significant rises in all rivers, but 
water levels remained below flood stage in the smaller 
basins of southern New England such as the Blackstone, 
Thames and Naugatuck, because of Corps reservoirs and 
dry antecedent conditions with no snowmelt. Active 
snowmelt in the hills and mountains of northern and 
central Vermont and New Hampshire, however, combined 
with the rainfall to create flood conditions along the 
mainstems and tributaries within the Connecticut and 
Merrimack Basins. The entire length of the Connecticut 
River from White River Junction, Vermont to Long Island 
Sound rose to several feet above flood stage, and the 
Pemmigewasset River upstream of Franklin Falls Dam 
and the Merrimack River at Lowell, Massachusetts also 
experienced flood conditions. 
Corps reservoirs reduced stages significantly during this 
flood, as flood control storage utilized ranged from about 
30 to 70 percent at reservoirs in the Connecticut River 
Basin and between about 40 and 75 percent at reservoirs 
in the Merrimack River Basin. Regulation at Corps 
reservoirs in the remaining basins resulted in lesser 
amounts of flood control storage. 
Just as runoff from this first storm was being released 
from flood control storage, another intense storm was 
forecast for New England. Because of this, releases from 
Corps reservoirs were throttled to a minimum again, just 
as a large slow moving storm hit southern and much of 
central New England with heavy rainfall ranging from 4- 
7 inches. Resulting inflows into already partially full 
reservoirs resulted in record pool levels at 21 projects and 
near record amounts at 8 others. In six cases (Knightville, 
Townshend, Ball Mountain, Surry Mountain, Otter Brook, 
and Edward MacDowell) flood control storage was 
exceeded resulting in uncontrolled spillway discharge. 
The extensive runoff created widespread flooding conditions 
particularly within the middle and lower reaches of 
the Merrimack and Connecticut River Basins. At Lowell, 
Massachusetts the Merrimack River rose to its highest 
level since September 1938, and the Nashua, Concord and 
Spicket Rivers experienced serious flooding. In the Connecticut 
River Basin the mainstem again rose several feet 
above flood levels from Brattleboro, Vermont to its mouth, 
and flooding was experienced in the West, Ashuelot, 
Deerfield, Westfield and Farmington River watersheds. 
Within the Naugatuck, Shetucket, Quinebaug, French and 
Blackstone River watersheds the main rivers rose to bank 
full capacities, but no significant flooding was experienced 
in areas located downstream of Corps reservoirs. 
A tabulation of damages prevented by Corps projects by 
states during these two floods is given below: 
Connecticut .......................... $224,164,000 
Massachusetts .......................... 201,684,000 
New Hampshire ...................... 14,397,000 
Rhode Island ............................... 9,975,000 
M aine .................................... 7,605,000 
Vermont .................................. 4,771,000 
1-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Connecticut River Basin 
Storages at Corps reservoirs for the March-April event 
exceeded 100 percent at Knightville, Townshend, Ball 
Mountain, Surry Mountain and Otter Brook. In addition 
to these projects, storage at many of the other reservoirs 
in the basin exceeded the previous maximum. These 
included Littleville - 89 percent, North Springfield - 82 
percent, Birch Hill - 80 percent, Barre Falls - 72 percent, 
North Hartland - 71 percent and Tully - 62 percent. 
Regulation for canoe activities occurred at Ball 
Mountain and Townshend - October 1986 and May 1987, 
Birch Hill and Tully - April 1987 and Knightville and 
Littleville - March and April 1987. 
Non-flood releases were made from Colebrook Lake for 
low flow augmentation in July and August 1987 and for 
water supply throughout the year. Non-flood releases from 
North Hartland Lake have been controlled by the Vermont 
Electric Generation and Transmission Cooperative for 
hydropower throughout fiscal year 1987. 
Merrimack River Basin 
The March-April flood not only resulted in spillway discharge 
at Edward MacDowell Lake but also in record 
levels at other reservoirs in the basin. Levels reached 95 
percent of storage at Hopkinton-Everett and 90 percent 
of storage at Blackwater. At Franklin Falls, the 76 
percent storage represented the second greatest level at 
the project. 
Blackwater Dam was regulated for canoe races in 
April 1987. 
Thames River Basin 
Reservoir levels in the Thames River Basin as a result 
of the flood of March-April rose to record levels at three 
of the six reservoirs in the basin. Those experiencing 
record levels were West Thompson - 60 percent, Hodges 
Village - 59 percent and Buffumville - 58 percent. East 
Brimfield and Westville experienced reservoir levels of 
47 and 48 percent of capacity which were nearly equal to 
the maximum levels experienced during the flood of 1984. 
Other regulation activities in the basin included 
regulation for canoeing at Mansfield Hollow in June and 
September, East Brimfield, Westville and Hodges Village 
in April. Also the permanent pool at West Thompson 
was raised on several occasions during fiscal year 1987 to 
accommodate AKC retreiver trials and powerboat competitions. 
Water supply releases were made from East 
Brimfield during August. 
Naugatuck River Basin 
Regulation of reservoirs in the Naugatuck River Basin 
during the March-April floods resulted in a record level 
at the East Branch reservoir of 31 percent. Other levels 
experienced during this flood were Black Rock - 41 
percent, Hancock Brook - 37 percent, Hop Brook - 35 
percent and Thomaston - 34 percent. 
Blackstone River Basin 
As a result of the flood of March-April, the reservoir 
level at West Hill Dam reached 67 percent of capacity, 
which exceeded the previous maximum level experienced 
in 1984. 
51. HURRICANE BARRIER 
OPERATIONS 
Five hurricane barriers are situated along the southern 
coast of New England, protecting coastal communities from 
tidal flooding associated with hurricanes for severe coastal 
storms. The Corps operates the navigational elements of the 
Stamford, Connecticut and New Bedford-Fairhaven, 
Massachusetts barriers. The Fox Point, Rhode Island and 
the Pawcatuck and New London, Connecticut barriers are 
operated by the local communities. A brief resume of 
operations for the fiscal year follows: 
Stamford Barrier. The barrier gates were operated on 
sixteen occasions for coastal storms and prevented $150,000 
in damages during fiscal year 1987. 
New Bedford Barrier. The New Bedford Barrier was 
operated on five occasions for coastal storms and prevented 
$575,000 in damages during fiscal year 1987. 
Fox Point Hurricane Barrier. The Fox Point 
Hurricane Barrier was not operated during fiscal year 1987 
and did not experience damaging tidal flood conditions. 
Pawcatuck Hurricane Barrier. The Pawcatuck 
Hurricane Barrier was not operated during fiscal year 1987 
and did not experience damaging tidal flood conditions. 
New London Hurricane Barrier. The New London 
Hurricane Barrier was not operated during fiscal year 1987 
and did not experience damaging tidal flood conditions. 
52. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 1-E at end of chapter). 
53. FLOOD CONTROL WORK 
UNDER SPECIAL AUTHORIZATION 
Flood control activities pursuant to Section 205. Public 
Law 858, 80th Congress, as amended (preauthorization). 
(See Table 1-J at end of chapter). 
Snagging and clearing activities pursuant to Section 208 
of the 1954 Flood Control Act. 
Blackstone River, Millbury, MA ................. $4,000 
H artford, VT ..................................... 6,500 
Kennebec River, Bingham, ME .................. 7,500 
Saco River, Conway, NH ........................ 5,000 
Suncook River, NH ............................... 3,500 
Emergency Bank Protection activities pursuant to Section 
14 of the 1946 Flood Control Act. 
Fiscal year costs were as follows: 
Baker Brook, Rumney, NH ..................... $3,500 
Belfast, M E ................... ............... 19,840 
1-26

NEW ENGLAND DIVISION 
Blackstone River, Millbury, MA ................. 1,696 
Bottom Brook, Northfield, MA ................... 5,700 
Clear River, Burrillville, RI ................... 113,034 
(See Section 33A of Text) 
Connecticut River, Chesterfield, NH .............. 3,435 
Connecticut River, Middletown, CT ............. 16,479 
Covered Bridge, Sheffield, MA ................ 194,832 
(See Section 37B of Text) 
Farmington River, CT .......................... 35,436 
Gulf Street, Milford, CT ....................... 189,474 
(See Section 36 of Text) 
Herring River, Scituate, MA ..................... 6,970 
Machias River, Machias, ME .................. 134,143 
(See Section 38 of Text) 
Manet Beach, Quincy, MA ......................... 483 
Marginal Way, Ogunquit, ME ................. 201,427 
(See Section 39 of Text) 
Mason, NH .................... ................ .. 8,300 
Mill Brook, Brownsville, VT .................... 60,335 
(See Section 351 of Text) 
Narraguagus River, Milbridge, ME ............... 4,800 
Newbury Neck, Surry, ME ...................... 3,518 
North River, Colrain, MA ....................... 17,500 
North River, Shelburne, MA ..................... 5,500 
Northumberland, NH ............................ 6,000 
Perley Brook, Fort Kent, ME ................... 11,945 
Pleasant Point, Perry, ME ..................... 137,797 
(See Section 43 of Text) 
Roosevelt International Park, Lubec, ME ......... 41,990 
Russell, M A ..................................... 4,000 
Sandy Point, West Haven, CT .................... 7,500 
Smith River, Grafton, NH ...................... 7,126 
South River, Ashfield, MA ...................... 17,500 
South River, Conway, MA ...................... 90,887 
(See Section 35N of Text) 
Surf Street, Saco, ME .......................... 23,863 
Emergency flood control activities - repair, flood 
fighting, and rescue work (Public Law 99, 84th Cong., and 
antecedent legislation). 
Federal costs for fiscal year were $146,307 for disaster 
preparedness. 
Streambank Erosion Control Evaluation and Demonstration 
Act of 1974 as amended in 1976 (Section 32 of the 
Water Resources Development Act of 1974. P.L. 93-251). 
There were no fiscal year costs for demonstration project 
proposals. Total costs to 30 September 1987 were 
$1,204,996. 
54. DEAUTHORIZED PROJECTS 
(See Table 1-G at end of chapter). 
The Water Resources Development Act of 1986 (Public 
Law 99-662), signed on November 17, 1986, deauthorized 
a number of unconstructed projects or portions of 
projects. They included: 
Connecticut - Bridgeport Harbor-Black Rock Harbor, 
Connecticut River below Hartford, Mystic River, 
Silver Beach to Cedar Beach, Stonington Harbor, 
Thames River, New Haven Harbor, and Milford 
Harbor. 
Maine - Bar Harbor, Dickey-Lincoln School, Kennebec 
River, and Rockland Harbor. 
Massachusetts - Edgartown Harbor, Fall River Harbor, 
Ipswich River, Nantucket Harbor of Refuge Anchorage, 
New Bedford and Fairhaven Harbor, Newburyport 
Harbor, Nookagee Lake, Pleasant Bay, Salem 
Harbor, Winthrop Beach, Lynn Harbor, Monoosnoc 
Brook, Monoosnoc Lake, and Town Neck Beach. 
Rhode Island - Great Salt Pond, Harbor of Refuge, 
Block Island, Pawcatuck River, Little Narragansett 
Bay, Providence River and Harbor, and Westerly Hurricane 
Protection. 
General Investigations 
55. SURVEYS 
Costs for the fiscal year for surveys from regular funds 
were $1,619,894 of which $132,409 was for two navigation 
studies; $231,594 for two flood damage prevention 
studies; $893,199 for four comprehensive studies; $5,308 
for review of three completed or deferred projects; 
$357,384 for coordination studies. 
56. COLLECTION AND STUDY OF 
BASIC DATA 
The Division Engineer is the U.S. member on Saint 
Croix River Board of Control. Annual inspections are 
made of conditions on the Saint Croix River and a continuing 
program of compilation of basic hydrologic information 
is carried out. Division Engineer's representatives 
during the past year kept closely in touch with developments 
in the basin and cooperated with their Canadian 
counterparts assisting in development of basins' resources. 
Total costs for the fiscal year were $15,114. Total costs to 
30 September 1987 were $194,537. 
Flood plain studies comprise compilation and dissemination, 
upon responsible local request, of information on 
floods and potential flood damages, including indentification 
of areas subject to inundation by floods of various 
magnitudes and frequencies, and general criteria for 
guidance in use of flood plain area; and engineering advice 
to local interests for their use in planning to ameliorate 
flood hazard. Total costs for the fiscal year were $185,774. 
Total costs to 30 September 1987 are $5,130,399. 
1-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
57. CONTINUATION OF PLANNING 
AND ENGINEERING 
Total costs for continuation of Planning and Engineering 
were $181,221 of which $258 was for channels and 
harbors and $180,963 for local protection. 
The channels and harbor study was at Portsmouth, 
New Hampshire. The continuing local protection studies 
were for Town Brook in Quincy, Massachusetts and for 
Roughans Point in Revere, Massachusetts. 
58. ADVANCE ENGINEERING 
AND DESIGN 
Advance Engineering and design costs were $290,357 
for navigation projects at Bristol Harbor, RI and New 
Haven Harbor, CT. 
1-28

NEW ENGLAND DIVISION 
MAXIMUM STORAGE FOR NEW ENGLAND DIVISION 
FLOOD CONTROL RESERVOIRS DURING THE MARCH-APRIL 1987 FLOOD 
PEAK 
DRAINAGE PEAK STAGE FLOOD CONTROL 
PROJECT AREA STAGE RANKING STORAGE UTILIZED 
ACRE- MILLION PERCENT 
SQ. MI. FEET GALLONS INCHES FULL 
Connecticut River Basin 
UNION VILLAGE 126 97.8 4 12,600 4,100 1.9 34 
NORTH HARTLAND 220 135.8 1 48,800 15,900 4.2 71 
NORTH SPRINGFIELD 158 85.2 1 40,300 13,200 4.8 82 
BALL MOUNTAIN 172 213.9 1 54,300 17,700 5.9 100+ 
TOWNSHEND 106 (net) 98.6 1 35,000 11,400 6.2 100+ 
SURRY MOUNTAIN 100 66.1 1 32,800 10,700 6.1 100+ 
OTTER BROOK 47 99.4 1 18,100 5,900 7.3 100+ 
BIRCH HILL 175 33.8 1 40,500 13,200 4.3 80 
TULLY 50 35.3 1 12,600 4,100 4.8 62 
BARRE FALLS' 55 801.4 1 16,700 5,400 5.6 72 
CONANT BROOK 7.8 17.7 6 250 80 0.6 6 
KNIGHTVILLE 162 132.4 1 51,500 16,800 6.3 100+ 
LITTLE VILLE1 52 571.7 1 21,000 6,800 7.7 89 
COLEBROOKI 118 732.8 5 43,0002 14,0002 6.72 41 
MAD RIVER 18 74.5 2 2,360 770 2.5 26 
SUCKER BROOK 3.4 24.9 2 340 110 1.9 24 
Merrimack River Basin 
FRANKLIN FALLS1 1000 375.4 2 116,100 37,800 2.2 76 
BLACKWATERI 128 564.1 1 40,900 13,300 6.0 90 
HOPKINTONEVERETTI 
446 (net) 415.8 1 154,000 50,200 6.5 95 
MACDOWELL1 44 949.8 1 16,200 5,300 7.0 100+ 
Naugatuck River Basin 
THOMASTON 70.7 (net) 75.6 3 14,300 4,700 2.7 34 
BLACK ROCK 20.4 79.0 3 3,600 1,200 3.6 41 
HOP BROOK 16.4 50.5 4 2,500 800 3.0 35 
HANCOCK BROOK 12 19 (est) 2 1,400 460 2.2 37 
NORTHFIELD BROOK 5.7 62 (est) 2 750 240 2.5 32 
HALL MEADOW 17.2 21.6 2 1,800 590 2.0 19 
EAST BRANCH 9.3 39.8 1 1,330 430 3.2 31 
Thames River Basin 
EAST BRIMFIELD 67.5 26.0 2 14,000 4,600 3.9 47 
WESTVILLE 32 (net) 49.2 2 5,300 1,700 3.1 48 
WEST THOMPSON 74 (net) 40.9 1 15,400 5,000 3.9 60 
HODGES VILLAGE 31.1 27.4 1 7,900 2,600 4.8 59 
BUFFUMVILLE 26.5 32.5 1 6,500 2,100 4.7 58 
MANSFIELD HOLLOW 159 46.8 4 25,500 8,300 3.0 50 
Blackstone River Basin 
WEST HILL 28 25.5 1 8,350 2,700 5.6 67 
NOTES: (1) Elevation of the pool is in feet MGVD. 
(2) Volume of runoff stored during flood event 
1-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 1-A COST AND FINANCIAL STATEMENT 
See 
Section 
In Text Project 
1. Aquatic Plant 
Control 
2. Black Rock 
Harbor, CT 
3. Bristol Harbor 
Bristol, RI 
4. Cape Cod Canal, 
MA 
(Contributed 
Funds) 
5. Chatham (Stage) 
Harbor, MA 
(Contributed 
Funds) 
6. Connecticut River 
below Hartford, 
CT 
(Contributed 
Funds) 
7. Cuttyhunk 
Harbor, MA 
(Contributed 
Funds) 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Minor rehab. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Total Cost 
to 
FY84 FY85 FY86 FY87 Sept. 30, 1987 
7,995 
79,359 
242,071 
4,865,718 
5,311,711 
14,269 
509,000 
509,225 
1,775,602 
3,387,864 
40,000 
35,241 
22,900 
22,180 
-531 
6,469,630 
6,765,682 
30,000 
31,931 
23,000 
23,000 
113,000 
64,396 
6,093,171 
6,101,729 
168 
-400 
42 
177,567 
179,124 
19,880 
19,880 
129,792 
118,673 
20,516 
20,654 
12,000 257,496 
8,770 251,423 
10,300 1,561,559 
23,750 1,555,714 
-35,000 316,288 
13,604 316,288 
- 1,654 
- 1,654 
- 32,786,2191,2 
- 32,786,2191,2 
5,850,021 92,546,605 
5,709,255 92,136,029 
- 115,432 
- 115,432 
- 390,677 
- 390,677 
- 26,609,000 
- 26,609,000 
- 266,70541 
- 266,70541 
692,982 2,612,95542 
692,995 2,612,95542 
- 43,500 
- 43,500 
- 1,541,1853,4 
- 1,541,1853,4 
228,904 14,973,2056 
229,000 14,962,1645 
- 60,000 
- 60,000 
- 130,410 
- 130,410 
- 27,167 
- 27,167 
87,095 1,051,16943 
87,095 1,051,16943 
- 11,643 
- 11,643 
1-30

NEW ENGLAND DIVISION 
TABLE 1-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
In Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
8. Green Harbor, 
MA 
(Contributed 
Funds) 
9. Hampton Harbor, 
NH 
(Contributed 
Funds) 
10. Harbor of Refuge, 
Block Island, RI 
11. Hyannis Harbor, 
MA 
(Contributed 
Funds) 
12. Jonesport Harbor, 
ME 
(Contributed 
Funds - Required) 
13. Kennebec River, 
ME 
14. Milford Harbor, CT 
(Contributed 
Funds) 
(Contributed 
Funds - Other) 
15. New Haven 
Harbot, CT 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
- 254,512 
- 254,512 
154,525 
192,598 
254,900 
264,505 
58,116 310,696 2,075,995 
44,232 268,600 2,008,979 
168,000 
9,658 168,000 
317,558 
311,599 
-6,000 
- - 200,000 
- - 200,000 
4,000 299,800 2,062,016 
3,587 299,749 2,061,510 
- 193,761 
- 193,761 
- 576,856 
- 576,856 
16,105 
16,105 
18,398 
18,398 
25,000 
13,889 
357,454 
339,813 
40,000 
3,725 
14,664 192,442 1,534,397 
14,664 192,442 1,534,397 
15,184 
16,473 
205,000 2,860,000 
261,017 38,658 
- 80,000 
22,003 422,302 
22,003 421,393 
22,082 
22,082 
57,390 
57,390 
- 484,499 
- 484,499 
2,000 643,1956 
6,490 631,3336 
- 103,001 
- 103.001 
3,370,000 
539,837 
80,000 
- 1,599,9407 
- 1,599,9407 
38,188 2,253,246 
39,097 2,253,246 
35,275 
35,274 
- 200,000 
90,50644 
90,50644 
715,03445 
715,03345 
11,380 
11,380 
200,000 
- 600,000 4,805,2468 
- 276,753 4,481,9998 
648,500 
971,281 
106,071 
103,063 
22,564 
25,795 
15,514 12,805,2389 
16,214 12,805,1889 
1-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 1-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
In Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
16. Newburyport Harbor, 
MA 
17. Plymouth Harbor, 
MA 
(Contributed 
Funds - Required) 
18. Point Judith Pond 
and Harbor of 
Refuge, RI 
(Contributed 
Funds) 
19. Portsmouth Harbor and 
Piscataqua River, 
ME and NH 
(Contributed 
Funds - Required) 
20. Rockport Harbor, ME 
21. Rockport Harbor 
and Pigeon Cove 
Rockport, MA 
(Contributed 
Funds - Required) 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Major Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
569,225 
569,225 
-19,652 
6,305 
236 
236 
-125,695 
612,029 
21,243 
24,225 
10,395 
10,395 
-358,831 
644,031 
34,909 
36,759 
343,200 4,438,661 
343,100 4,438,048 
- 1,415,524 
- 1,415,524 
- 2,127,21812 
- 2,127,21812 
- 70,000 994,90146 
- 69,405 994,30646 
426,000 
425,264 
- 573,000 
- 541,611 
- 894,475 
- 894,475 
- 2,714,51011 
- 2,714,51011 
927,000 4,769,884 
920,741 4,759,129 
- 1,926,000 
- 1,926,000 
- 17,587 
- 17,587 
- 13,605 
889,482 
889,033 
748 
1,844 
- 200,258 5,584,30110 
13,349 138,211 5,522,25410 
2,800 
2,800 
12,121 1,949,080 
12,121 1,949,080 
- 99,707 
- 99,707 
- 32,00047 
- 32,00047 
- 31,640 
- 31,596 
2,258 
105,000 
85,406 
86,160 
86,116 
50,000 1,127,000 1,562,000 
47,420 1,058,356 1,470,881 
- 39,000 
39,000 
39,000 
39,000 
1-32

TABLE 1-A (Continued) 
See 
Section 
In Text Project 
22. Rye Harbor, NH 
(Contributed 
Funds - Required) 
(Contributed 
Funds - Other) 
23. Sesuit Harbor, MA 
(Contributed 
Funds - Required) 
28. Revere Beach, MA 
(Contributed 
Funds) 
33A. Clear River, 
Burrillville, RI 
33B. West Hill Dam, 
MA 
34. Charles River 
(Natural Valley) 
Storage Areas), MA 
35A. Ball Mountain 
Lake, VT 
35B. Barre Falls Dam, 
MA 
35C. Beaver Brook, 
Keene, NH 
NEW ENGLAND DIVISION 
COST AND FINANCIAL STATEMENT 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Total Cost 
to 
FY84 FY85 FY86 FY87 Sept. 30, 1987 
22,173 
22,173 
15,804 
15,804 
32,093 
32,093 
4,887 
4,887 
- 230,000 
- 195,093 
- 50,000 
- 40,704 
182,000 
171,654 
125,000 
118,167 
132,000 
120,973 
4,000 
3,872 
354,000 
341,628 
252,000 
240,017 
50,000 
22,795 
212,700 
196,959 
140,000 
177,899 
144,000 
149,099 
336 
698 
588,800 
456,093 
416,600 
378,002 
44,819 
44,819 
19,817 
19,817 
34,807 
130,000 
7,180 
264,000 
243,999 
191,000 
96,871 
198,000 
156,239 
606,000 
660,207 
405,000 
334,097 
236,000 1,775,000 
223,473 1,731,994 
- 130,342 
- 130,342 
52,077 180,530 
51,644 180,097 
- 61,338 
- 61,338 
- 81,548 
- 81,548 
- 226,306 
- 226,306 
9,704 50,212 
9,050 49,558 
- 124,588 
- 124,588 
125,000 608,71213 
124,486 608,09813 
- 142,965 
- 142,965 
-10,000 170,000 
113,034 160,918 
- 2,306,90214 
- 2,306,90214 
360,200 3,084,434 
338,096 3,016,161 
0 8,606,000 
46,706 8,520,893 
226,100 700,100 
248,942 675,253 
- 11,039,29815 
- 11,039,29815 
337,200 5,814,939 
352,118 5,727,710 
- 1,967,819 
- 1,967,819 
436,400 4,123,027 
476,702 4,027,121 
240,000 2,526,000 
330,001 2,525,869 
1-33

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 1-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
In Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
35D. Birch Hill Dam, MA 
(Contributed 
Funds) 
35E. Colebrook River 
Lake, CT 
35F. Conant Brook 
Dam, MA 
35G. Knightville Dam, 
MA 
35H. Littleville Lake, 
MA 
351. Mill Brook, 
Brownsville, VT 
35J. North Hartland 
Lake, VT 
35K. North Springfield 
Lake, VT 
35L. Otter Brook 
Lake, NH 
35M. Riverdale, West 
Springfield, MA 
(Contributed 
Funds) 
35N. South River, 
Conway, MA 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
230,000 230,800 217,000 
204,543 261,717 215,317 
- 4,815,67916 
- 4,815,67916 
363,500 4,131,227 
281,087 4,039,812 
- 32,00017 
- 32,00017 
- 14,263,971 
- 14,263,971 
107,000 
104,747 
150,900 
159,338 
190,000 
185,002 
308,100 2,307,544 
275,495 2,263,685 
- 2,950,530 
- 2,950,530 
82,000 
76,250 
59,000 
55,768 
588,000 349,400 
465,260 490,983 
126,000 
115,990 
296,000 
301,828 
237,000 248,800 464,000 
251,701 250,330 290,889 
- 15,000 
- 10,694 
38,000 
23,188 
301,000 329,700 279,000 
281,472 325,812 264,351 
312,000 818,000 861,000 
309,613 715,240 972,541 
2,000 
2,525 
339,000 
321,897 
112,500 1,193,180 
102,705 1,164,231 
- 3,415,64018 
- 3,415,64018 
384,000 5,312,904 
319,196 5,238,295 
- 7,013,412 
- 7,013,412 
268,500 3,478,391 
426,542 3,455,946 
45,000 
60,335 
98,000 
94,217 
- 7,312,2251's 
- 7,312,225's19 
298,300 4,071,115 
323,690 4,049,446 
- 6,831,52620 
- 6,831,52620 
559,000 6,541,097 
504,542 6,473,762 
- - - 4,360,44821 
- - - 4,360,44821 
401,300 356,000 299,100 4,018,714 
333,319 448,103 299,796 3,999,136 
- 20,000 
- 7,125 
- 44,500 
- 7,735 
50,000 
28,263 
105,000 1,263,000 
109,734 1,254,859 
- 25,000 
- 25,000 
45,000 139,500 
90,887 126,885 
1-34

NEW ENGLAND DIVISION 
TABLE 1-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
In Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
350. Surry Mountain 
Lake, NH 
35P. Townsend Lake, 
VT 
35Q. Tully Lake, MA 
(Contributed 
Funds) 
35R. Union Village 
Dam, VT 
35S. West Springfield, 
MA 
(Contributed 
Funds) 
36. Gulf Street, 
Milford, CT 
37A. Black Rock Lake, 
CT 
37B. Covered Bridge, 
Housatonic River, 
Sheffield, MA 
(Contributed 
Funds - Required) 
37C. Hancock Brook 
Lake, CT 
37D. Hop Brook Lake, 
CT 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
- - - - 2,833,61022 
- - - - 2,833,61022 
394,000 391,300 280,000 289,100 4,782,543 
403,328 373,176 294,216 282,718 4,752,306 
- - - - 7,398,41323 
- - - - 7,398,41323 
289,000 673,900 472,000 456,300 5,532,771 
266,179 569,734 541,835 469,469 5,471,315 
- - - - 1,666,75224 
- - - - 1,666,75224 
285,000 371,900 313,000 323,000 3,922,986 
279,572 297,333 310,633 397,130 3,897,446 
- - - - 40,00017 
- - - - 40,00017 
- - - - 4,095,16025 
- - - - 4,095,16025 
293,000 250,700 
284,628 243,528 
- 112,162 
13,000 
12,169 
- 48,500 
- 38,921 
181,000 
178,239 
35,000 
33,286 
162,000 
170,351 
660 
216,000 
243,036 
37 
190,000 
10,309 
191,000 
172,852 
50,000 
2,073 
- 180,000 
79,000 
77,599 
382,000 
379,251 
94,400 
96,252 
375,400 
321,003 
84,000 
80,751 
531,000 
499,564 
251,900 3,777,456 
245,621 3,762,911 
- 1,793,72448 
649 1,762,25148 
- 13,000 
11,500 250,000 
189,474 238,704 
- 8,182,300 
- 8,182,300 
213,400 2,384,009 
203,952 2,354,574 
153,000 
194,832 
175,999 
250,000 
242,833 
180,000 
175,999 
- 4,178,911 
- 4,178,911 
68,700 1,144,349 
62,798 1,135,125 
- 6,151,56226 
- 6,151,56226 
523,900 4,454,785 
542,357 4,365,174 
1-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 1-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
In Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
37E. Northfield Brook 
Lake, CT 
37F. Thomaston Dam, 
CT 
38. Machias River, 
Machias, ME 
39. Marginal Way, 
Ogunquit, ME 
40A. Blackwater Dam, 
NH 
40B. Edward MacDowell 
Lake, NH 
40C. Franklin Falls 
Dam, NH 
40D. Hopkinton-Everett 
Lakes, NH 
41. New Bedford, 
Fairhaven and 
Acushnet, MA 
(Contributed 
Funds) 
42. New London, CT 
(Contributed 
Funds-Required) 
(Other 
Contributed 
Funds) 
43. Pleasant Point, 
Perry, ME 
44. Roughans Point, 
Revere, MA 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
129,000 
117,350 
254,000 
236,598 
167,000 
165,282 
205,000 
207,435 
325,000 
336,139 
429,000 
428,898 
202,000 
330,791 
825,000 
625,839 
300,000 
93,884 
84,750 
58,208 
156,800 
151,456 
588,500 
405,293 
32,500 
13,081 
193,200 
197,527 
232,600 
229,583 
200,000 
202,038 
343,000 
533,544 
53,500 
31,996 
- 2,850,51227 
- 2,850,51227 
165,300 1,813,011 
173,108 1,797,769 
- 14,282,112 
- 14,282,112 
621,400 4,914,167 
352,751 4,625,309 
113,500 167,000 
134.143 166.139 
30,000 187,500 250,000 
22,784 201,427 237,292 
- - 1,319,74628 
- - 1,319,74628 
248,000 216,000 3,066,985 
213,093 239,615 3,054,759 
- - 2,014,25329 
- - 2,014,25329 
277,000 379,700 3,751,092 
254,523 349,964 3,680,613 
- - 7,950,48730 
- - - 7,950,48730 
562,100 367,000 389,122 5,783,259 
563,698 438,508 361,738 5,740,621 
- - - 21,452,44031 
- - - 21,452,44031 
568,800 512,500 528,722 6,717,262 
489,672 502,046 568,737 6,649,191 
227,750 120,000 
230,766 115,033 
350,000 
540,331 
65,000 
218,246 
37,640 
124,061 
54,932 
6,500 
3,500 
63,000 
46,949 
- 11,510,088 
- 11,510,088 
122,400 3,682,264 
119,269 3,671,802 
- 6,513,76332 
- 6,513,76332 
- 9,272,046 
24,802 9,267,992 
- 2,255,00033 
-21 2,251,29333 
- 222,250 
- 219,250 
130,000 193,000 
137,797 184,746 
15,779 183,000 284,901 
- 74,673 106,972 
483,680 
181,645 
1-36

NEW ENGLAND DIVISION 
TABLE 1-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
In Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
46. Stamford, CT 
(Contributed 
Funds-Required) 
(Other 
Contributed 
Funds) 
47A. Buffumville Lake, 
MA 
47B. East Brimfield 
Lake, MA 
47C. Hodges Village 
Dam, MA 
47D. Mansfield Hollow 
Lake, CT 
47E. West Thompson 
Lake, CT 
47F. Westville Lake, 
MA 
48. Town Brook, 
Quincy and Braintree, MA 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
190,000 
364,097 
297,000 
305,796 
164,000 
137,426 
308,000 
291,612 
207,000 
204,938 
480 
320,000 
376,345 
210,000 
207,808 
312,400 
292,103 
- - 9,911,300 
- 22 9,900,640 
156,000 123,100 2,581,472 
185,598 117,216 2,567,863 
- - 3,367,97034 
- - 3,367,45334 
- - 210,000 
- - 209,969 
- - 2,998,60335 
- - 2,998,60335 
243,000 213,400 3,302,722 
256,020 202,934 3,281,956 
- - - 7,057,04336 
- - - 7,057,04336 
191,100 215,000 254,400 2,775,083 
208,938 211,889 225,428 2,732,371 
195 - - 4,461,26837 
195 - - 4,461,26837 
350,800 271,500 484,400 3,468,488 
350,711 295,212 383,725 3,343,613 
- - - 6,447,16438 
- - - 6,447,16438 
239,500 178,000 335,400 3,426,197 
244,183 173,872 322,863 3,408,035 
- - - 7,001,22039 
- - - 7,001,22039 
317,300 423,000 318,400 3,675,398 
301,293 423,571 322,774 3,656,569 
243,000 373,300 
199,852 377,556 
- 20,740 
382,000 
342,850 
250,000 
217,001 
- 5,684,68340 
- 5,684,68340 
409,900 3,478,996 
461,487 3,431,238 
350,000 620,740 
345,011 562,012 
1-37

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 1-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
In Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
1 Includes $6,138,157 from Public Works Funds and 
$4,849,740 from Emergency Relief Funds. 
2 Includes $389,929 Code 711 funds and $511,089 Code 713 
funds. 
3 Includes $287,374 for previous projects. 
4 Excludes $9,000 for subproject "Eightmile River, CT". 
5 Includes $366,348 for previous projects. 
6 Excludes $129,757 expended for rehabilitation; breakwater 
repaired in 1961. 
7 Includes $509,411 for previous projects. 
8 Includes $331,626 for previous projects. Includes $290,877 
National Industrial Recovery Funds and $59,207 Public Works 
Funds. 
S9 Includes $32,570 for previous projects. 
10 Includes $130,393 for previous projects. 
11 Includes $12,000 for previous project. 
12 Includes $188,647 for previous projects. 
13 Excludes $73,800 for previous project. 
14 Includes $18,310 Code 711 funds. 
15 Includes $504,060 Code 711 funds. 
16 Includes $618,469 Code 711 funds and $32,000 Code 713 
funds. 
17 Recreational cost sharing. 
18isI ncludes $199,303 Code 711 funds. 
19 Includes $229,436 Code 711 funds. 
20 Includes $59,536 Code 711 funds. 
21 Includes $364,688 Code 711 funds. 
22 Includes $470,077 Code 711 funds. 
23 Includes $245,168 Code 711 funds. 
24 Includes $3,695 Code 711 funds and $115,138 Code 713 funds. 
25 Includes $88,932 Code 711 funds. 
26 Includes $143,538 Code 711 funds. 
27 Includes $20,000 Code 711 funds. 
28 Includes $2,881 Code 711 funds. 
29 Includes $6,432 Code 711 funds. 
o30 Includes $4,671 Code 711 funds. 
31 Includes $179,728 Code 711 funds. 
32 Cash for construction only. Excludes $164,020 expended to 
date for land condemnation. 
33 Excludes $22,517 expended to date for land condemnations. 
34 Cash for construction only. Excludes $199,410 expended to 
date for land condemnations. 
35 Includes $71,943 Code 711 funds. 
36 Includes $207,700 Code 711 funds. 
37 Includes $6,255 Code 711 funds and $40,353 Code 713 funds. 
38 Includes $68,717 Code 711 funds. 
39 Includes $315,420 Code 711 funds. 
40 Includes $67,667 Code 711 funds. 
41 Includes $7,889 for previous project. 
42 Includes $83,276 for maintenance of previous project. 
43 Excludes $50,000 Contributed Funds expended for 
maintenance. 
44 Includes $42,340 for previous project. 
45 Includes $3,160 for previous project. 
46 Includes $2,013 for previous projects. In addition $400 was 
expended for maintenance from Contributed Funds. 
47 Excludes $15,000 expended for previous project. 
48 Includes $245,000 Public Works Funds. 
1-38

NEW ENGLAND DIVISION 
TABLE 1-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
AQUATIC PLANT CONTROL (See Section 1 of Text). 
Control and progressive eradication of obnoxious Aquatic Plant 
growths from the waters and streams in the U.S. 
Research and planning costs to be borne by U.S. 
Provided for continued research. 
H. Doc. 37, 85th Cong., 1st sess. 
Public Law 87-874, 87th Cong. 
H. Doc. 251, 89th Cong. 
July 3, 1930 
August 13, 1968 
Jan. 21, 1927 (Sec. 2) 
Included in Public 
Works Administration 
program, 
Sept. 6, 1933 
June 26, 1934 (Permanent 
Appropriations 
Repeal Act) 
Included in Public 
Works Administration 
program 
Apr. 29, 1935 
Included in Emergency 
Relief Program, 
May 28, 1935 
Aug. 30, 1935 
Mar. 2, 1945 
July 3, 1958 
Mar. 2, 1945 
June 10, 1872 
Mar. 3, 1881 
June 25, 1910 
Feb. 27, 1911 
Mar. 2, 1919 
Aug. 30, 1935 
May 24, 1937 
Mar. 2, 1945 
July 14, 1960, 
as amended 
BLACK ROCK HARBOR, CT 
(See Section 2 of Text). 
(Authorized and constructed as part of the 
Bridgeport Harbor, CT project). 
Black Rock Harbor 18 feet deep and 100 to 200 feet wide from 
the 18-foot contour in harbor to the heads of both branches of 
Cedar Creek, about 2.4 miles. 
BRISTOL HARBOR, BRISTOL, RI 
(See Section 3 of Text). 
Construction of a rubblestone breakwater 1,600 feet long 
CAPE COD CANAL, MA. (See Section 4 of Text). 
Purchase canal from Boston, Cape Cod & New York 
Canal Co., in accordance with contract dated July 29, 
1921, executed by that company. 
Construct 3 bridges and widen canal to 250 feet 
Operation and care of works of improvement provided 
for the funds from War Department appropriations for 
rivers and harbors. 
Construct a mooring basin. 
Dredging and bank protection. 
Existing project for main canal adopted. 
15-foot channel and turning basin in Onset Bay. 
Extend East Boat Basin for an area of about 4.3 acres to 
a depth of 8 feet. 
CHATHAM (STAGE) HARBOR, MA 
(See Section 5 of Text) 
Entrance Channel 10 feet deep, 150 feet wide from Chatham 
Roads into upper harbor. 
CONNECTICUT RIVER BELOW HARTFORD, CT 
(See Section 6 of Text). 
Jetties at the mouth 
The Hartford dike. 
Channel and turning basin in Eightmile River. 
Present project dimensions of channel over Saybrook Bar. 
Dikes, training walls, and revetments 
Present project dimensions of channel and additional 
dikes, training walls, revetments, and accessory works. 
Park River declared nonnavigable. 
Channel and anchorages, North Cove, Old Saybrook 
Channel and anchorage in Essex Cove. 
Channel and anchorage in Wethersfield Cove. 
H. Doc. 281, 71st Cong., 2nd sess. 
H. Doc. 174, 90th Cong., 1st sess. 
H. Doc. 139, 67th Cong., 2nd sess. 
H. Doc. 795, 71st. Cong., 3rd sess. 
Do. 
Do. 
Do. 
Rivers and Harbor Committee 
Doc. 15, 74th Cong., 1st sess. 
H. Doc. 431, 77th Cong., 1st 
sess. 
H. Doc. 168 85th Cong. 1st 
sess. 
H. Doc. 456, 77th Cong., 1st sess. 
Annual Report 1942. 
Present project dimensions approved 
by Chief of Engineers, Dec. 22, 1887. 
Present project dimensions authorized 
by Chief of Engineers in 1889. 
H. Doc. 327, 60th Cong., 1st sess. 
H. Doc. 1294, 61st. Cong.,3rd sess. 
H. Doc. 132, 65th Cong., 1st sess.' 
H. Doc. 49, 73rd Cong., 1st sess. 
Ltr. Sec. War, Apr. 21, 1937. 
H. Doc. 368, 76th Cong., 1st sess.' 
P.L. 86-645, Sec. 107, Authorized by 
Chief of Engineers, October 18, 1961. 
P.L. 86-645, Sec. 107, Authorized by 
Chief of Engineers, Nov. 15, 1960. 
1-39 
July 3, 1958 
Oct. 23, 1962 
Oct. 27, 1965

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 1-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 26, 1937 
July 14, 1960, as 
amended 
July 14, 1960, as 
amended in 1965 
July 11, 1870 
Aug. 2, 1882 
Aug. 5, 1886 
June 3, 1896 
Mar. 2, 1827 
July 11, 1871 
Aug. 5, 1886 
Mar. 2, 1945 
Oct. 27, 1965 
June 13, 1902 
Mar. 2, 1907 
Mar. 4, 1913 
Oct. 17, 1940 
June 2, 1874 
Oct. 16, 1879 
June 13, 1902 
August 26, 1937 
July 14, 1960 
CUTTYHUNK HARBOR, MA (See Section 7 of Text) 
Channel 10 feet deep, 75 feet wide. 
Anchorage 10 feet deep, 900 feet long, 800 feet wide. 
Maintenance of existing jetties and stone dikes. 
GREEN HARBOR, MA (See Section 8 of Text) 
Channel 6 feet deep, 100 feet wide from deep water to head 
of navigation; anchorage near town pier; sealing 
rebuilding in part and extension of existing west jetty. 
HAMPTON HARBOR, NH (See Section 9 of Text) 
Extending north jetty 1,000 feet, raising outer 300 feet 
south jetty and constructing 180-foot spur to high 
ground, channel 8 feet deep, 150 feet wide across 
entrance bar. 
HARBOR OF REFUGE, BLOCK ISLAND, RI 
(See Section 10 of Text). 
The main breakwater 
Repairs to basin walls and cliff protection east of 
harbor. 
Breakwater inclosing inner harbor. 
Raising crest of main breakwater and making it 
sandtight. 
HYANNIS HARBOR, MA (See Section 11 of Text) 
Breakwater. 
Present dimensions of breakwater. 
Dredging behind breakwater. 
Channel, anchorage and jetty. 
JONESPORT HARBOR, ME (See Section 12 of Text). 
A steel sheetpile breakwater 1200 feet in length. 
A 15-acre anchorage composed of 9-acres; 6 feet deep and 
6 acres 8 feet deep. 
An entrance channel 100 feet wide and 8 feet deep. 
KENNEBEC RIVER, ME (See Section 13 of Text). 
Channel between Augusta and Gardiner, ME 
Channel below Gardiner, ME 
Channel west of Swan Island. 
27-foot channel from mouth of Bath. 
MILFORD HARBOR, CT (See Section 14 of Text). 
East jetty at the mouth of the river. 
West jetty at the mouth of the river. 
Entrance channel. 
Anchorage west of channel and present project dimensions 
of channel above Merwin's Wharf 
6-foot anchorage west of 8-foot channel. 
H. Doc. 81, 75th Cong., 1st sess. 
P.L. 86-645, Section 107. Authorized 
by Chief of Engineers, Dec. 15, 1965. 
P.L. 86-645, Section 107. Authorized 
by Chief of Engineers, Feb. 18, 1964. 
Annual Report 1868, p. 785 and 
S. Misc. Doc. 81, 40th Cong., 
2nd sess. 
S. Ex. Doc. 26, 47th Cong., 
1st sess. 
S. Doc. 27, 48th Cong., 2nd 
sess. and Annual Report 
1885, p. 610. 
H. Doc. 83, 54th Cong., 1st 
sess. 
S. Doc. 32, 18th Cong., 2nd sess. 
H. Doc. 63, 41st Cong., 2nd sess. 
H. Ex. Doc. 96, 48th Cong., 2nd 
sess. 
H. Doc. 98, 77th Cong., 1st 
sess.' 
H. Doc. 481, 94th Cong., 2nd sess. 
Authorized by H. Res. 23 Sept. 76 and 
S. Res. 1 Oct. 76 pursuant to Sec. 201 
of cited Act. 
H. Doc. 262, 56th Cong., 1st sess.1 
H. Doc. 321, 59th Cong. 2nd sess.' 
H. Doc. 746, 62nd Cong., 2nd sess.' 
S. Doc. 55, 77th Cong., 1st sess.' 
H. Ex. Doc. 107, 42nd Cong., 3rd sess., 
and Annual Report 1873, p. 1042. 
Authorized by Dept., Oct. 16, 1879, 
Annual Report for 1879, p. 342. 
H. Doc. 280, 56th cong., 1st sess. 
H. Doc. 77, 75th Cong., 1st sess. 
P.L. 86-645, Section 107, Authorized 
by Chief of Engineers, Feb. 13, 1961. 
1-40

NEW ENGLAND DIVISION 
TABLE 1-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 2, 1882 
Mar. 3, 1899 
July 25, 1912 
Do. 
July 3, 1930 
Aug. 30, 19352 
Mar. 2, 1945 
July 24, 1946 
Aug. 16, 1949 
Aug. 9, 1955 
Nov. 17, 1986 
June 14, 1880 
June 25, 1910 
Mar. 3, 1899 
Mar. 4, 1913 
Sept. 22, 1922 
Oct. 23, 1962 
July 9, 1965 
Sept. 16, 1890 
Mar. 2, 1907 
June 25, 1910 
Mar. 2, 1919 
June 30, 1948 
July 14, 1960, 
as amended 
Sept. 3, 1954 
Oct. 23, 1962 
July 14, 1960, 
as amended 
Nov. 17, 1986 
NEW HAVEN HARBOR, CT (See Section 15 of Text) 
Sandy Point dike. 
The 16-foot anchorage basin. 
Present project dimensions of channels in Mill River. 
Present project dimensions of West River channel and 
anchorage. 
18- and 16-foot channels in Quinnipiac River. 
25-foot channel 
30-foot channel and anchorage and present location 
of 16-foot anchorage. 
35-foot main channel, elimination of 30-foot anchorage, 
present location and extent of 16-foot anchorage 
Brewery Street channel declared nonnavigable. 
Abandonment of upper end of West River. 
Deepen main ship channel to 40 feet; widen main ship channel 
to 500 feet; widen at Southwest Ledge to minimum of 780 feet; 
straighten channel downstream of turning basin. 
NEWBURYPORT HARBOR, MA (See section 16 
of Text). 
Construction of rubblestone jetties. 
Dredging the bar at entrance to harbor. 
PLYMOUTH HARBOR, MA (See Section 17 of Text). 
Beach protection. 
Dredging 18-foot channel. 
Dredging 15-foot extension, including turning basin. 
Rubblestone breakwater. Anchorages are 8 feet deep inside 
breakwater. Elimination of authorized 18-foot anchorage 
from existing project. 
Recreational development. 
POINT JUDITH POND AND HARBOR 
OF REFUGE, POINT JUDITH, RI 
(See Section 18 of Text). 
The main breakwater. 
Present dimensions of eastern shore arm. 
Western shore arm. 
Removing 3 shoals from the harbor arm. 
Abandons project for entrance to Point Judith Ponds, and 
authorizes channels and anchorages in lower pond and 
upper pond. 
Extension of existing 15-foot channel. 
PORTSMOUTH HARBOR & PISCATAQUA RIVER, 
ME and NH (See Section 19 of Text). 
Removal of ledge rock; widening 35-foot channel; extending 
channel and maneuvering basins above Boiling Rock and at 
head of project. 
Modified existing project for widening and extending 
35-foot channel 
Construct 6-foot channels and anchorages 
Widen 35-foot channel to 1,000 feet between two vertical lift 
bridges; widen northern limit of 35-foot channel by 100 feet and 
widen southern limit to 550 feet at Goat Island. 
Plans approved by a Board of 
Engineers, Oct. 2, 1882. 
H. Doc. 82, 55th Cong., 1st sess. 
H. Doc. 26, 62nd Cong., 1st sess. 
H. Doc. 535 62nd Cong., 2nd sess. 
H. Doc. 686, 69th Cong., 2nd sess. 
H. Doc. 479, 72nd Cong., 2nd sess. 
H. Doc. 307, 76th Cong., 1st sess. 
H. Doc. 517, 79th Cong., 2nd sess.' 
Annual Report 1910, p. 59. 
Annual Report for 1899, p. 1089. 
H. Doc. 1194, 62nd Cong., 3rd sess. 
H. Doc. 996, 66th Cong., 3rd sess. 
H. Doc. 124, 87th Cong., 2nd sess. 
H. Doc. 66, 51st Cong., 1st sess. 
H. Doc. 60, 58th Cong., 2nd sess. 
H. Doc. 911, 60th Cong., 1st sess. 
H. Doc. 2001, 64th Cong., 2nd sess. 
S. Doc. 15, 80th Cong., 1st sess. 
PL 86-645, Section 107, Authorized by 
Chief of Engineers, Sept. 29, 1976. 
Annual Report 1892 H. Doc. 556, 
82nd Cong., 2nd sess. 
H. Doc. 482, 87th Cong., 2nd sess. 
P.L. 86-645, Sec. 107. Authorized by 
Chief of Engineers, December 23, 
1965 
1-41

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 1-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 11, 1888 
June 25, 1910 
July 14, 1960, 
as amended 
July 14, 1960, 
as amended 
July 14, 1960, 
as amended 
Sept. 3, 1954 
Oct. 27, 1965 
Nov. 17, 1986 
July 24, 1946, 
as amended 
Mar. 7, 1974 
June 30, 1948, 
as amended 
July 24, 1946, 
as amended 
June 30, 1948, 
as amended 
ROCKPORT HARBOR, ME (See Section 20 of Text). 
Dredge an area about 400 feet by 600 feet in front of wharves at the 
head of the harbor to a depth of 12 feet at mean low tide and for 
removal of a small ledge. 
Remove the ledge at the entrance to a depth of 15 feet at mean low 
tide; widening the entrance channel to 250 feet. 
ROCKPORT HARBOR AND PIGEON COVE, ROCKPORT, 
MA (See Section 21 of Text). 
An access channel - 10 feet deep by 80 feet wide. Two outer harbor 
anchorages between the breakwater and the town wharf. 
Pigeon Cove consists of 75-foot wide channel - 10 feet deep; 
dredge anchorage area north of channel to -8 feet. 
RYE HARBOR, NH (See Section 22 of Text). 
Dredge channel 100 feet wide and 10 feet deep for 600 feet 
through entrance, thence 8 feet deep within harbor; dredge 
2 anchorages and maintain existing breakwaters. 
SESUIT HARBOR, MA(See Section 23 of Text). 
Channel 6 feet deep and 100 feet wide. 
REVERE BEACH, MA (See Section 28 of Text). 
Placement of sandfill for protection and improvement. 
Raising and widening of about 13,000 feet of beach by 
placement of sandfill 
BIG RIVER RESERVOIR, RI (See Section 32 of Text) 
Construct rolled-earth dam. 
CLEAR RIVER, BURRILLVILLE, RI 
(See Section 33A of Text.) 
Remove approximately 60 linear feet of granite retaining 
wall, damaged from erosion, and construct a new 
mortared stone wall. 
CHARLES RIVER (NATURAL VALLEY STORAGE 
AREAS), MA (See Section 34 of Text). 
Federal acquisition and perpetual protection of 17 crucial 
natural valley storage areas totalling 8,422 acres in what 
is known as the Middle and Upper watershed of the 
Charles River. 
BEAVER BROOK, KEENE, NH (See Section 35C of Text). 
Construct improvements to reduce the damaging 
effects of floods. 
MILL BROOK, BROWNSVILLE, VT 
(See Section 35I of Text). 
Clear lower portion of bank and fill with compacted gravel. 
Protect bank with layer of "tri-lock" grid blocks extended 
approximately 9 feet above channel bed. 
RIVERDALE, WEST SPRINGFIELD, MA 
(See Section 35M of Text). 
Construct improvements to existing pumping station 
River and Harbor Act. H. Ex. 
Doc. 141, 50th Cong., 1st sess. 
River and Harbor Act. H. Doc. 963, 
60th Cong. 1st sess. 
P.L. 86-645, Section 107. Authorized by 
Chief of Engineers, March 27, 1986. 
H. Doc. 439, 86th Cong., 2nd sess. 
P.L. 86-645, Sec. 107. Authorized by 
Chief of Engineers, February 6, 1980. 
H. Doc. 146, 82nd Cong., 1st sess. 
H. Doc. 211, 91st Cong., 2nd sess. 
Authorized by H. Res. 15 Dec. 70 and 
S. Res. 17 Dec. 70 pursuant to 
Section 201 of 1965 Flood Control 
Act. 
P.L. 79-526, Section 14. Authorized by 
Chief of Engineers, May 15, 1985. 
Chief of Engineers report dated 
December 6, 1972. 
P.L. 80-858, Section 205. Authorized 
by Chief of Engineers, June 21, 1985. 
P.L. 79-526, Section 14. Authorized by 
Chief of Engineers, July 23, 1986. 
P.L. 80-858, Section 205, Authorized by 
Chief of Engineers, June 13, 1986. 
1-42

NEW ENGLAND DIVISION 
TABLE 1-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 24, 1946, 
as amended 
June 28, 1938 
June 30, 1948, 
as amended 
July 24, 1946, 
as amended 
July 24, 1946, 
as amended 
July 24, 1946, 
as amended 
July 24, 1946 
as amended 
July 3, 1958 
Oct. 23, 1962 
Oct. 22, 1976 
July 24, 1946, 
as amended 
Nov. 17, 1986 
SOUTH RIVER, CONWAY, MA (See Section 35N of Text) 
Site 2 protection consisting of 3-foot thick uniform stone 
layer; site 3 terraced slope refilled with compacted 
random fill. 
WEST SPRINGFIELD, MA 
(See Section 35S of Text). 
A system of earth levees and concrete floodwalls approx. 
24,500 feet long. Work involves raising 13,700 feet of 
existing levee; constructing 2,300 feet of floodwall; 
improving 2,400 feet of river bank; treating 6,100 feet of 
existing levee foundation. Three pumping stations with 
appurtenant drainage facilities also constructed. 
Raise the floodwall section of the West Springfield 
project by 1 foot in combination with a flood forecasting 
system. 
GULF STREET, MILFORD, CT (See Section 36 of Text). 
Construction of stone slope protection. 
COVERED BRIDGE, HOUSATONIC RIVER, 
SHEFFIELD, MA (See Section 37B of Text). 
Construct 70-foot long stone apron. On both banks 
upstream and downstream of bridge, place 
riprap along 500 linear feet. 
MACHIAS RIVER, MACHIAS, ME 
(See Section 38 of Text). 
Construct 250 linear feet of stone slope along north bank 
adjacent to the municipal parking lot. 
MARGINAL WAY, OGUNQUIT, ME 
(See Section 39 of Text) 
Place 2-foot layer of armor stone along the 150-foot section 
of walkway. Construct 150 linear feet of 42-inch thick stone 
slope along walkway. 
NEW BEDFORD, FAIRHAVEN AND ACUSHNET, 
MA (See Section 41 of Text). 
Hurricane barriers in New Bedford Harbor. 
NEW LONDON, CT (See Section 42 of Text). 
Hurricane barrier protecting city of New London from 
tidal damage. 
PLEASANT POINT, PERRY, ME (See Section 43 of Text) 
Construct precast concrete modular wall stacked to 6-foot 
height along 600 feet of shorefront. 
P.L. 79-526, Section 14. Authorized 
by Chief of Engineers, April 1, 
1986. 
H. Doc. 455, 75th Cong., 2nd sess. 
P.L. 80-858, Section 205. 
Authorized by Chief of Engineers, 
October 5, 1982. 
P.L. 79-526, Section 14. Authorized by 
Chief of Engineers, September 11, 
1984. 
P.L. 79-526, Section 14. Authorized by 
by Chief of Engineers, July 24, 
1984. 
P.L. 79-526, Section 14. Authorized 
by chief of Engineers, July 29, 1986. 
P.L. 79-526, Section 14. Authorized 
by Chief of Engineers, May 7, 1986. 
S. Doc. 59, 85th Cong., 1st sess. 
H. Doc. 478, 87th Cong., 2nd sess. 
P.L. 79-526, Section 14. Authorized 
by Chief of Engineers, July 31, 1986. 
ROUGHANS POINT, REVERE, MA 
(See Section 44 of Text). 
Stabilize existing facilities along the shore with a 4,080-foot long 
armor stone revetment. Construct earth berm 1-foot high and 
200 feet long on existing median strip between Bennington Street 
and State Road. 
1-43

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 1-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
STAMFORD, CT (See Section 46 of Text). 
July 14, 1960 Hurricane barrier protecting areas of Stamford from H. Doc. 210, 86th Cong., 1st sess. 
tidal damage. 
TOWN BROOK, QUINCY & BRAINTREE, MA 
(See Section 48 of Text). 
Nov. 17, 1986 Construct 12-foot diameter, 4,060-foot long, concrete lined tunnel H. Doc. 39, 99th Cong., 1st sess. 
in bedrock approximately 190 feet below ground. 
1 Contains latest maps. 
2 Also Public Works Administration, September 6, 1933. 
1-44

NEW ENGLAND DIVISION 
TABLE 1-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to September 30, 1987 
Full Report Contributed 
See Annual Operation and Funds Expended 
Project Report for Construction Maintenance (Construction) 
Andrews River, MA1,6,15 
Apponaug Cove, RI' 
Bagaduce River, ME3,4, 5 
Bar Harbor, ME 1' 
Bass Harbor, ME1,"6 
Bass Harbor Bar, ME' 
Beals Harbor, ME 1' 
Belfast Harbor, ME' 
Bellamy River, NH1,3, 4 
Beverly Harbor, MA' 
Boothbay Harbor, ME 1' 
Boston Harbor, MA",22 
Branford Harbor, CT' 
Bridgeport Harbor, CT' 
Bucks Harbor, Machiasport, ME' 6 
Bucksport Harbor, ME 1' 
Bullocks Point Cove, RI' 
Bunker Harbor, ME",6 
Buttermilk Bay Channel, MA1,6 
Camden Harbor, ME 1' 
Canapitsit Channel, MA', 4 
Cape Porpoise Harbor, ME 1' 
Carvers Harbor, Vinalhaven, ME 1' 
Cathance River, ME'1, 3 
Clinton Harbor, CT' 
Coasters Island Harbor, RI"4 
Cobscook Bay, ME1,3, 4 
Cocheco River, NH',, 4 
Cohasset Harbor, MA' 
Connecticut River (above Hartford), 
CT8 
Corea Harbor, Gouldsboro, ME', 6 
Criehaven Harbor, ME 1' 
Cross Rip Shoals Nantucket Sound, 
MA' 
Damariscotta River, ME', 4 
Deer Island Thoroughfare, ME',4 
Dorchester Bay and Neponset 
River, MA" 
Duck Island Harbor, CT' 
Duxbury Harbor, MA' 
East Boothbay Harbor, ME 1' 
Eastport Harbor, ME' 
Edgartown Harbor, MA' 
Essex River, MA' 
Exeter River, NH', 4 
Fall River Harbor, MA' 
Falmouth Harbor, MA' 
Fivemile River Harbor, CT' 
Frenchboro Harbor, ME' 
Georges River, ME 1' 
Gloucester Harbor and Annisquam 
River, MA' 
Great Salt Pond, Block Island, RI' 5 
Greenwich Bay, RI' 
Greenwich Harbor, CT' 
Guilford Harbor, CT' 
Harraseeket River, ME', 4 
Hay (West Harbor), Fisher's 
Island, NY' 
Hendrick's Harbor, ME 1 
Hingham Harbor, MA' 
Housatonic River, CT6 
Ipswich River, MA 
Island End River, Chelsea, MAI,6 
Isle Au Haut Thoroughfare, ME 1 
Isle of Shoals Harbor, ME and NH' 
1954 
1906 
1916 
1968 
1953 
1978 
1953 
1984 
1978 
1948 
1913 
1984 
1978 
1969 
1978 
1978 
1983 
1983 
1893 
1969 
1983 
1896 
1931 
1957 
1954 
1983 
1969 
1983 
1980 
1977 
1981 
1964 
1912 
1932 
1965 
1920 
1959 
1971 
1897 
1951 
1953 
1984 
1978 
1983 
1976 
1907 
1979 
1969 
1985 
1960 
1899 
1977 
1964 
1884 
1985 
1911 
1866 
1913 
1979 
1932 
1984 
1939 
$ 219,042 
156,8742 
28,000 
406,591 
188,859 
4,076 
184,880 
61,56132 
34,643 
246,048 
18,000 
25,313,08333 
9,537 
4,491,11949 
277,420 
18,421 
170,902 
95,372 
163,855 
102,400 
9,113 
175,037 
190,438 
21,000 
104,957 
5,500 
4,173 
119,089 
267,76738 
116,324 
797,954 
40,776 
24,200 
5,000 
40,000 
94,584 
482,166 
421,29729 
6,500 
638,67547 
65,61435 
21,759 
27,454 
6,164,75740 
123,763 
35,490 
657,345 
25,788 
1,296,93436 
189,037 
2,000 
198,758 
137,222 
30,963 
8,401 
28,204 
28,316 
859,691 
5,618 
311,850 
137,653 
80,691 
$ 421,477 $ 187,500 
23,429 
39 
2,187 
21,475 
12,175 
104,272 
252,763 
16,821 
22,983 
9,890,81319 
1,013,268 
2,002,41250 
16,838 
13,593 
76,667 
28,406 
183,74946 
125,936 
12,279 
347,865 
9,021 
953,027 
13,161 
42,617 
219,713 
15,822 
73,150 
8,125 
54,328 
905 
304,621 
399,546 
798,722 
17,238 
192,624 
48,699 
83,93814 
3,032 
2,064,76734 
287,622 
188,802 
24,616 
228,937 
1,458,475 
550,235 
6,527 
204,872 
1,230,576 
5,309 
31,120 
6,325 
156,022 
2,437,499 
32,947 
163,280 
643,364 
1-45 
100,000 
147,887 
123,757 
69,323 
20,000 
127,000 
35,00030 
10,000 
35,000 
25,500 
100,000 
25,500 
222,010 
314,50048

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 1-C (Continued) OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to September 30, 1987 
Full Report Contributed 
See Annual Operation and Funds Expended 
Project Report for Construction Maintenance (Construction) 
Josias River, ME 1 1977 115,565 122,173 26,813 
Kennebunk River, ME' 1985 261,417 1,234,403 88,917 
Kingston Harbor (North Plymouth), 
MA' 1895 8,940- 
Lagoon Pond, Martha's Vineyard, 
MA1, 6 1976 99,098 9,089 80,990 
Lamprey River, NH, 4 1913 19,980 33,563 
Little Harbor. NH,4, 26 1977 133.227 266,119 
Little Harbor, Woods Hole, MA', 4 1906 18,000 5,224 
Lubec Channel, ME1 1956 380,322 23,941 
Lynn Harbor, MA' 1956 755,576 206,203 
Machias River, ME' 1972 32,000 185,217 
Malden River, MA1, 2
0 1922 104,853 45,097 62,000 
Matinicus Harbor, ME 1 1962 14,00021 8,989 
Medomak River, ME 1 1953 17,000 92,359 
Menemsha Creek, MA' 1981 56,926 629,644 12,500 
Merrimack River, MA' 1940 369,891 158,224 
Mianus River, CT' 1985 132,435 659,390 46,500 
Moosabec Bar, ME 1 1930 11,400 25,227 
Mystic River, CT' 1957 197,582 125,012 14,000 
Mystic River, MA1 1986 3,222,777 1,964,740 
Nantucket (Harbor of Refuge), MA' 1965 502,66123 458,705 
Narraguagus River, ME 1 1969 821,144 71,087 
New Bedford and Fairhaven 
Harbors, MA' 1953 1,857,618 708,967 20,385 
New Harbor, ME 1 1966 118,62024 26,944 7,015 
New Haven Breakwater, CT' 1950 1,242,246 40,273 
New London Harbor, CT' 1986 638,77417 1,813,465 
Newport Harbor, RI' 1953 733,524 128,223 
Niantic Bay and Harbor, CT1,6 1972 66,464 71,570 67,500 
Northeast Harbor, ME 1 1954 138,942 51,047 
Norwalk Harbor, CT 1 1983 531,12939 3,723,52042 34,500 
Owl's Head Harbor, ME is 1968 124,158 13,867 4,383 
Patchogue River, CT1,22 1984 355,445 621,988 56,694 
Pawcatuck River, Little Narragansett 
Bay and Watch Hill Cove, RI & CT' 1978 318,78731 656,506 20,000 
Pawtuxet Cove, RI' 1975 295,356 152,105 295,356 
Penobscot River, ME' 1985 501,020 877,567 
Pepperell Cove, ME' 1969 171,351 26,553 
Pig Island Gut, ME1, 6 1966 191,753 46,460 
Pleasant River, ME 1 1892 3,500 217 
Pollock Rip Shoals, Nantucket 
Sound, MA' 1956 1,083,504 846,590 
Portland Harbor, ME 1 1985 9,588,71027 7,903,331 
Potowomut River, RI' 1882 5,000 50 
Providence River & Harbor, RI' 1976 25,417,02228 3,830,502 
Provincetown Harbor, MA 5 1985 3,548,95441 1,053,966 760,000 
Red Brook Harbor, Bourne, MA6,s 1972 38,764 - 
Richmond Harbor, ME1,"4 1883 20,000 - 
Richmond's Island Harbor, ME1,4 1882 119,844 1,808 
Rockland Harbor, ME 1 1976 1,948,462 452,800 255,000 
Rockport and Old Harbors 
Rockport, MA 1986 22,000 194,963 
Royal River, ME1,6 1986 336,704 670,29512 49,562s" 
Saco River, ME,' 1986 1,064,983 1,676,752 
St. Croix River, ME 1 1950 179,550 36,392 19,892 
Sakonnet Harbor, RI' 1983 764,651 180,016 21,928 
Sakonnet River, RI1,o 1909 38,427 9,549 
Salem Harbor, MA 1969 1,693,202 437,788 
Sandy Bay (Harbor of Refuge), 
Cape Ann, MA" 1922 1,925,553 16,060 
Sasanoa River, ME1,3, 4 1915 35,000 124 
Scarboro River, ME 1 1976 392,635 1,239,293 10,000 
Scituate Harbor, MA 1971 379,851 131,507 69,976 
Searsport Harbor, ME 1966 572,56816 31,120 
Seekonk River, RI' 1954 672,214 793,234 67,792 
South Bristol Harbor, ME' 1971 89,593 11,052 2,663 
1-46

NEW ENGLAND DIVISION 
TABLE 1-C (Continued) OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to September 30, 1987 
Full Report Contributed 
See Annual Operation and Funds Expended 
Project Report for Construction Maintenance (Construction) 
Southport Harbor, CT1 1962 96,9277 251,842 18,525 
Southwest Harbor, ME 1 1962 180,042 66,540 7,501 
Stamford Harbor, CT 5 1980 892,82437 1,683,02045 169,636 
Stockton Harbor, ME1,3,4 1915 33,000 23,216 
Stonington Harbor, CT1 1959 377,328 123,060 
Stonington Harbor, MEl,6 1985 898,500 5,067 
Stony Creek, Branford, CT',6 1978 112,487 274,413 92,000 
Sullivan Falls Harbor, ME 1 1914 19,871 - 
Taunton River, MA 5 1948 442,895 32,917 
Tenants Harbor, ME 1 1920 18,750 13,292 
Thames River, CT 1 1967 1,471,919 1,588,546 
Union River, ME3,15 1912 146,855 119,515 
Vineyard Haven, MA 1 1943 27,186 8,699 
Wareham Harbor, MA 5 1896 95,997 10,296 
Warren River, RI' 1890 5,000 - 
Warwick Cove, RI1',6 1975 155,430 51,196 107,220 
Wellfleet Harbor, MA' 1981 157,63425 904,469 32,000 
Wells Harbor, ME 1 1979 360,973 1,615,162 212,000 
Westcott Cove, CT' 1978 55,960 217,309 21,000 
Westport Harbor and 
Saugatuck River, CT5 1972 19,308 180,824 
Westport River, MA 4 ,9 1942 - - 
Weymouth Back River, MA' 1944 48,740 7,184 20,000 
Weymouth-Fore & Town Rivs., MAI,22 1979 and 1983 30,194,61343 1,339,06844 630,133 
Wickford Harbor, RI1,22 1973 233,410 70,435 49,094 
Wilson Point Harbor, CT',4 1895 54,177 - 
Winnipesaukee Lake, NH' 1952 7,500 29,870 
Winter Harbor, ME",6 1976 162,937 - 
Winthrop Harbor, MA' 1895 8,992 38,515 
Wood Island Harbor, and 
Pool at Biddeford, ME 1 1957 143,112 72,977 12,000 
Woods Hole Channel, MA' 1940 230,000 51,718 
York Harbor, ME' 1977 239,654 351,090 32,161 
1 Completed. 
2 Excludes costs of $137,583 for local cooperation require 
ments, which includes $104,583 cash contribution. 
3 Abandonment recommended in H. Doc. 467, 69th 
Congress, 1st session. 
4 No commerce reported. 
5 Completed except for inactive portion. 
6 Authorized by the Chief of Engineers (Public Law 86- 
645, Sec. 107). 
7 Includes $37,714 Emergency Relief Funds. Excludes 
$18,525 Contributed Funds, of which $1,785 was for work 
outside approved project. 
8 Inactive. 
9 Awaiting local cooperation. Improvement to be 
restudied. 
1o Commerce included under Tiverton Harbor, RI. 
11 Authorized work remaining on project is comprised of 
an incomplete and an inactive portion. 
12 Excludes $20,000 expended from Contributed Funds, 
Other. 
3 Recommendation for abandonment of existing project 
made in H. Doc. 467, 69th Congress, 1st session. Portion of 
project authorized by the Chief of Engineers (P.L. 86-645, Sec. 
107) is complete. 
14 Excludes $5,000 Contributed Funds expended. 
15 Improvement adequate for commerce. 
16 Costs to local interests for berth improvements are estimated 
to be $60,000. 
17 Includes $40,800 for previous project. 
18 Abandonment recommended in H. Doc. 411, 64th 
Congress, 1st session, and in River and Harbor Committee Doc. 
3, 65th Congress, 1st session. 
19 Includes $17,879 for previous projects. Excludes $17,767 
Contributed Funds. 
20 Under State maintenance. 
21 Excludes $114,327 expended for rehabilitation; breakwater 
repaired in 1962. 
22 Portion of project authorized by Chief of Engineers. 
23 Excludes $211,649 expended for rehabilitation; jetty 
repaired in 1963. 
24 All assurances of local cooperation have not been 
fulfilled. Public landing at Back Cove has not been constructed. 
Portion of project authorized by Chief of Engineers (Public Law 
86-645, Sec. 107). 
25 Includes $11,350 for previous project. 
26 H. Doc. 467, 69th Cong., 1st sess. recommended 
eliminating maintenance dredging. 
27 Includes $692,435 for previous projects. 
28 Final fund adjustment made FY 1978 ($52,323.28). 
29 Includes $37,000 for new work for previous project. 
30 Excludes local requirements of $65,000 consisting of 
$13,000 for public wharf and $52,000 for additional construction 
costs. 
3' Includes $133,357 for previous project. 
32 Includes $22,000 for previous projects. 
u Includes $1,465,123 for previous projects. Includes 
$935,303 Emergency Relief Funds and $1,030,806 Public Works 
Funds. 
34 Includes $81,410 for previous project. 
35 Includes $15,614 for new work for previous projects. 
1-47

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 1-C OTHER AUTHORIZED NAVIGATION PROJECTS 
36 Includes $21,000 for previous projects. 
3z Includes $135,143 for previous project. 
38 Includes $10,000 for previous project. 
39 Includes $162,517 for previous project. 
40 Includes $330,204 for previous project. 
41 Includes $215,801 for previous project. 
42 Includes $66,120 for previous projects. 
43 Includes for previous projects $735,900 (Weymouth, 
Fore R.) and $25,000 (Town R.). 
44 Includes for previous project $5,250 (Weymouth, Fore 
River) and $12,577 (Weymouth, Town River). 
45 Includes $59,420 for previous project. 
46 Includes $35,214 from previous project. 
47 Excludes $141,530 expended Contributed Funds, Other. 
48 Excludes $829,000 Contributed Funds, Other expended. 
49 Includes $378,450 for previous project. 
50 Includes $11,949 for maintenance of previous project. 
51 Excludes $18,000 Contributed Funds, Other. 
1-48 
- -C- I I

NEW ENGLAND DIVISION 
TABLE 1-D OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
For Last 
Full Report Cost to Amount 
See Annual Sept. 30, 1987 Expended by 
Project Report For Construction Local Interest 
Burial Hill Beach, Westport, CT' 1958 $ 5,810 $ 11,612 
Calf Pasture Beach Park, Norwalk, CT' 1964 56,386 120,179 
Clark Point Beach, New Bedford, MA' 1982 228,081 228,080 
Cliff Walk, Newport, RI6 1984 405,491 955,237 
Compo Beach, Westport, CT' 1962 84,544 169,089 
Cove Island, Stamford, CT' 1961 47,131 94,262 
Cummings Park, Stamford, CT' 1963 26,886 53,771 
Guilford Point Beach (Jacobs Beach), Guilford, CT' 1961 15,620 31,241 
Gulf Beach, Milford, CT' 1958 21,303 42,606 
Hammonasset Beach, Madison, CT' 1956 163,183 326,366 
Hampton Beach, Hampton, NH1 1966 260,868 385,641 
Jennings Beach, Fairfield, CT' 1956 14,401 28,802 
Lighthouse Point Park (Area 9), CT' 1961 3,930 7,859 
Lynn-Nahant Beach, MA 1986 50,000 - 
Middle Beach, CT 1 1958 8,810 17,620 
Misquamicut Beach, Westerly, RI 3 1963 14,512 29,024 
Nantasket Beach, MA 4 1971-- 
North Scituate Beach, Scituate, MA 1 1969 106,552 106,552 
Oak Bluffs Town Beach, Martha's Vineyard, MA' 1976 273,334 198,583 
Oakland Beach, Warwick, RI' 1982 559,200 181,175 
Plum Island, MA' 1977 118,882 104,875 
Prospect Beach, West Haven, CT 1 1958 104,573 240,819 
Quincy Shore Beach, Quincy, MAx 1962 621,440 1,242,880 
Sand Hill Cove Beach, RI' 1959 40,143 82,000 
Sasco Hill Beach, Fairfield, CT' 1961 23,759 47,518 
Seaside Park, CT 1 1958 150,000 329,921 
Sherwood Island State Park, Westport, CT' 1983 1,186,830 889,330 
Short Beach, CT' - 5 - 
Silver Beach to Cedar Beach, CT 1964 62,560 270,695 
Southport Beach, CT 1 1960 17,631 35,263 
Town Beach, Plymouth, MA 1964 5,490 10,981 
Wallis Sands State Beach, Rye, NH 1 1966 65,131 435,942 
Wessagusset Beach, Weymouth, MA' 1971 180,944 200,208 
Willard Beach, South Portland, ME 1983 171,000 - 
Winthrop Beach, MA' 1960 176,567 353,134 
Woodmont Shore, Milford, CT' 1961 53,838 111,6792 
S Completed. 
2 Excludes $118,215 expended for work beyond scope of 
project. 
3 Additional Federal participation will be required based 
on Public Law 87-874. 
4 Project inactive. 
s Project completed at no cost to Federal Government by 
using fill from Federal navigation improvement at Housatonic 
River. 
6 Completed except for inactive portion. 
1-49

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 1-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Contributed 
Project Report for Construction Funds 
Alley Bay, Beals, ME3,4,1� 
Alford, Green River, MA3,4 
Amesbury, Powwow River, MA3,4 
Ansonia-Derby, CT3 
Bagaduce River, ME 3,4,10 
Blackstone River, Millbury, MA3,4,1�0 
Bound Brook, Scituate, MA3,4 
Canton, MA 3 ,4 
Charles River Dam, MA 3 
Charlestown, NH3,4 
Cherryfield, ME 3,4 
Chicopee, MA3 
Chicopee Falls, MA 3 
Cocheco River, NH3,4 
Connecticut River, North Stratford, NH3,4 
Connecticut River, W. Stewartstown, NH3, 4 
Danbury, CT3 
Derby, CT3 
East Branch Dam, CT3 
East Hartford, CT3 
Fitchburg, MA (See No. Nashua River) 
Folly Brook, Wethersfield, CT3,4 
Fort Kent, ME3,4 
Fox Point Barrier, RI3 
Gardner, MA 3,4 
Hall Meadow Brook Dam, CT 3 
Hartford, CT 3 
Hartford, White River, VT, 4 
Hayward Creek, Braintree-Quincy, MA3,4 
Holmes Bay, Whiting, ME3,4,1� 
Holyoke, MA3 
Housatonic River, Pittsfield, MA3,4 
Housatonic River, Salisbury, CT3,4,10� 
Housatonic River, Sheffield, MA3,4,10 
Huntington, MA3,4,1� 
Island Avenue, Quincy, MA3,4 
Islesboro (The Narrows), ME3,4,10� 
Johnson Bay, Lubec, ME3,4,10 
Keene, NH 3,4 
Lancaster, Israel River, NH3,4 
Lee, Housatonic River, MA3,4,10 
Little River Dike, Westfield, MA3 
Lowell, MA 3 
Lower Woonsocket, RI 3 
Mad River Lake, CT 3 
Merriconeag Sound, Harpswell, ME3,4,10 
Nashua, NH 3 
Nonewaug River, Woodbury, CT3,4,10 
Northampton, MA 3 
North Canaan, Blackberry River, CT3,4 
North Nashua River, Fitchburg, MA 3 
North Nashua River, Lancaster, MA3,4,10 
Norwalk, CT3,4 
Norwich, CT 3 
Park River, Hartford, CT 3 
Pawcatuck, CT 3 
Pawtuxet River, Warwick, RI 3,4 
Penobscot River, Old Town, ME3,4 
Phillips Lake, MA 
Port 5 Facility, Bridgeport, CT3,4,1o 
Prestile Stream, Blaine, ME,4,1o 
Salmon River, Colchester, CT 3,4 
Sand Cove, Gouldsboro, ME 
Saxonville, MA 3 
Sebasticook River, Hartland, ME 3,4 
Shelburne, Androscoggin River, NH3,4,1o 
Smelt Brook, Weymouth-Braintree, MA3,4 
1979 
1977 
1978 
1977 
1985 
1986 
1974 
1964 
1981 
1976 
1963 
1954 
1978 
1963 
1982 
1976 
1978 
1977 
1973 
1951 
1979 
1979 
1976 
1970 
1970 
1960 
1973 
1979 
1980 
1953 
1985 
1982 
1981 
1960 
1983 
1985 
1985 
1955 
1982 
1976 
1945 
1977 
1973 
1980 
1950 
1985 
1950 
1977 
1981 
1979 
1952 
1960 
1986 
1966 
1986 
1986 
1982 
1986 
1980 
1983 
1984 
1981 
1985 
1977 
1978 
$ 190,500 
41,419 
132,113 
18,266,040 
129,500 
248,650 
47,300 
180,6705 
41,170,921 
113,330 
203,000 
1,433,6007 
2,183,912 
183,100 
180,000 
54,703 
13,143,000 
7,582,642 
1,959,836 
2,135,447 
220,284 
1,997,820 
11,112,801 
495,691 
2,572,357 
6,094,1009 
332,236 
2,235,470 
207,390 
3,418,000 
739,003 
102,800 
202,608 
3,900 
172,000 
165,500 
163,082 
44,100 
551,606 
37,852 
5,000 
490,60011 
6,600,681 
4,773,020 
107,681 
270,0008 
222,500 
680,00017 
73,865 
3,235,00023 
81,671 
52,150 
1,209,000 
60,157,274 
644,311 
3,171,309 
178,045 
300,000 
227,500 
73,674 
247,100 
127,500 
4,218,700 
1,857,475 
37,657 
1,803,739 
1-50 
21 
4,576 
92,891 
5,554,08715 
385 
411,29222 
24,447 
13 
1,266,63820 
327 
- 16 
7,637 
3,679,50014 
15,500 
2,781,100 
24,447 
-_ 1 
,-3, 62 
-2 
-_ 1 
-1,0 
-_

NEW ENGLAND DIVISION 
TABLE 1-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Contributed 
Project Report for Construction Funds 
Springdale, MA3 1952 700,000 - 
Springfield, MA 3 1950 577,00018 5,350 
Squantz Pond, New Fairfield, CT3,4 1983 116,296 - 
Stony Brook, Wilton, NH 3,4 1973 19,500 - 
Sucker Brook Dam, CT3 1976 2,227,712 58,800 
Three Rivers, MA 3 1970 1,577,18912- 
Torrington, East Branch, CT3,4 1963 389,200 - 
Torrington, West Branch, CT3,4 1963 228,300 - 
Trumbull Lake, CT1 1983 1,498,799 - 
Village of Saxtons, VT3 ,4,10 1985 140,500 - 
Ware, MA3,4 1963 400,000 - 
Waterbury-Watertown, CT3,4 1963 263,300 - 
Weston, VT3,4 1957 13,000 1,800 
West Branch, Westfield River, Huntington, MA3,4 1983 116,492 - 
West Warren, MA3,4 1964 389,200 41,000 
Whitmanville Lake, MA 1979 605,023 - 
Winsted, CT 3 1954 245,500 - 
Woonsocket, RI3 1962 4,040,000 224, 500 
Worcester Diversion, MA 3 1978 5,086,859 79,300 
1 Inactive. 15 Excludes $1,674,567 Contributed Funds, Other. 
2 Excludes $1,146,828 expended from Contributed 16 Excludes $259,408 Contributed Funds, Other. 
Funds, Other. 17 Excludes $280,000 Public Works Administration funds. 
3 Completed. 18 Excludes $355,000 Public Works Administration funds. 
4 Authorized by Chief of Engineers. 19 Excludes $406,653 Contributed Funds, Other. 
5 Reflects FY1967 settlement of outstanding claims. 20 Excludes $488,920 Contributed Funds, Other. 
6 Excludes $8,503 Contributed Funds, Other. 21 Excludes $727,460 Contributed Funds, Other. 
Includes $295,000 Public Works Administration funds. 22 Excludes $12,000 expended for land condemnations and 
8 Excludes $147,366 Flood Control and Coastal Emergency $25,184 Contributed Funds, Other for relocations. 
funds expended. 23 Excludes $1,370,000 Public Works Administration 
9 Excludes $835,000 Public Works Administration funds. funds expended on Fitchburg, MA. 
O10 Emergency Bank Protection. 
11 Excludes $794,374 Public Works Administration funds. 
12 Excludes $565,168 Contributed Funds, Other. 
13 Excludes $3,000 Contributed Funds, Other. 
14 Cash for construction only. Excludes $245,000 
expended for land condemnation. 
TABLE 1-F OTHER AUTHORIZED MULTI-PURPOSE PROJECTS 
INCLUDING POWER 
For Last Cost to September 30, 1987 
Full Report 
See Annual Contributed 
Project Report for Construction Funds 
Passamaquoddy Tidal Power Project, ME 1 1935 6,384,394 
1 Work discontinued in 1937. Facilities transferred to War Assets Administration. 
1-51

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 1-G DEAUTHORIZED PROJECTS 
For Last Funds Expended 
Full Report 
See Annual Date Contributed 
Project Report For Deauthorized Federal Funds 
Alternative for Sugar Hill Reservoir - Aug 1977 $ - $ - 
Andover Lake, CT - Aug 1977 - - 
Bagaduce River, ME (uncompleted portion) - Oct 1978 - - 
Baker Brook, MA 1972 Nov 1979 94,000 - 
Bar Harbor, ME (uncompleted portion) 1932 Nov 1986 - - 
Beards Brook Reservoir, NH 1949 Aug 1977 78,000 - 
Beaver Brook Lake, NH 1973 Apr 1978 378,300 - 
Bennington Reservoir, NH 1949 Aug 1977 205,000 - 
Black Rock Harbor, CT (uncompleted portion) 1986 Nov 1986 - - 
Brant Rock Beach, Marshfield, MA 1961 Nov 1979 -- 
Bridgeport Harbor, CT (uncompleted portion) 1980 Nov 1979 - - 
Brockway Lake, VT 1946 Aug 1977 - - 
Cambridgeport Lake, VT - Aug 1977 -- 
Chicopee, MA (uncompleted portion) 1954 Aug 1977 -- 
Claremont Lake, NH 1968 Dec 1970 242,700 - 
Clyde, RI 1948 Apr 1951 8,800 - 
Connecticut River below Hartford 
CT (uncompleted portion) 1979 Oct 1978 - - 
Cotuit Harbor, MA 1962 Oct 1978 8,541 - 
Dickey - Lincoln School Lakes, ME 1984 Nov 1986 26,285,298 - 
Edgartown Harbor, MA (uncompleted portion) 1978 Nov 1986 - - 
Fall River Harbor, MA (uncompleted portion) 1984 Nov 1986 - - 
Fivemile River Harbor, CT (uncompleted portion) 1969 Oct 1978 - - 
Gaysville Lake, VT 1970 Oct 1976 206,600 - 
Great Salt Pond, Block Island, RI 
(uncompleted portion) 1983 Nov 1986 -- 
Greenwich Point Beach, CT 1959 Oct 1978 -- 
Harbor of Refuge, Block Island, RI 
(uncompleted portion) 1983 Nov 1986 - - 
Housatonic River, CT (uncompleted portion) 1979 Nov 1979 - - 
Honey Hill Lake, NH 1949 Aug 1977 92,000 - 
Ipswich River, MA (uncompleted portion) 1969 Nov 1986 - - 
Kennebec River, ME (uncompleted portion) 1986 Nov 1986 - - 
Ludlow Lake, VT - Aug 1977 - - 
Lynn Harbor, MA (uncompleted portion) 1956 Nov. 1986 - - 
Manchester Harbor, MA 1949 Nov 1979 23,986 - 
Marblehead Harbor, MA 1968 Oct 1978 43,711 - 
Mattapoisett Harbor, MA 1950 Oct 1978 -- 
Milford Harbor, CT (uncompleted portion) 1981 Nov 1986 - - 
Monoosnoc Brook, MA 1967 Nov 1986 - - 
Monoosnoc Lake, MA 1967 Nov 1986 - - 
Mountain Brook Dam, NH 1949 Aug 1977 57,000 - 
Mystic, CT 1968 Aug 1972 67,700 - 
Mystic River, CT (uncompleted portion) 1986 Nov 1986 -- 
Nantucket, Harbor of Refuge, MA 
(uncompleted portion) 1965 Nov 1986 - - 
Napatree Beach, RI - Nov 1979 -- 
Narragansett Pier, RI 1966 Nov 1970 115,590 - 
New Bedford and Fairhaven Harbors, MA 
(uncompleted portion) 1953 Nov 1986 -- 
Newburyport Harbor, MA (uncompleted portion) 1986 Nov 1986 - - 
New Haven Harbor, CT (uncompleted portion) 1986 Nov 1986 - - 
Nookagee Lake, MA 1976 Nov 1986 563,677 - 
North Andover and Lawrence, MA 1949 Aug 1977 20,000 - 
North Hampton Beach, North Hampton, NH 1963 Nov 1981 - - 
Norwalk-Wilton, CT 1973 Nov 1979 - - 
Pawcatuck River, Little Narragansett Bay, RI 1978 Nov 1986 
and CT (uncompleted portion) 
Pawcatuck River, RI & CT (uncompleted portion) 1979 Nov 1979 - - 
Pawtucket, RI 1949 Nov 1977 - - 
Pepperell Cove, ME (uncompleted portion) 1969 Nov 1981 - - 
Pleasant Bay, MA 1971 Nov 1986 - - 
Point Judith, RI 1968 Nov 1977 198,477 - 
Pontiac Diversion, RI 1948 Apr 1951 24,200 - 
Providence River and Harbor, RI 
(uncompleted portion) 1976 Nov 1986 
1-52

NEW ENGLAND DIVISION 
TABLE 1-G (Continued) DEAUTHORIZED PROJECTS 
For Last Funds Expended 
Full Report 
See Annual Date Contributed 
Project Report For Deauthorized Federal Funds 
Provincetown Beach (Herring Cove), MA 1961 Oct 1978 -- 
Provincetown Harbor, MA (uncompleted portion) 1979 Oct 1978 -- 
Rockland Harbor, ME (uncompleted portion) 1976 Nov 1986 -- 
Saco River, ME (uncompleted portion) 1979 Oct 1979 - - 
Sakonnet Harbor, RI (uncompleted portion) 1982 Jun 1982 176,000 - 
Salem Harbor, MA (uncompleted portion) 1969 Nov 1986 - - 
Sandy Bay, Cape Ann, MA (uncompleted portion) 1922 Oct 1978 - - 
Silver Beach to Cedar Beach, CT1 1964 Nov 1986 - - 
South Coventry Lake, CT 1951 Aug 1977 96,000 - 
South Tunbridge Lake, VT - Aug 1977 - - 
Stamford Harbor, CT (2 projects 
uncompleted portions) 1979 Oct 1978 - - 
Stonington Harbor, CT (uncompleted portion) 1959 Nov 1986 - - 
Stonington Harbor, ME 1961 Nov 1979 2,543 - 
Stratford, CT 1973 Mar 1977 934,500 - 
Sugar Hill Reservoir, NH 1946 Dec 1944 - - 
Thames River, CT (uncompleted portion) 1967 Nov 1986 - - 
The Island Lake, VT - Aug 1977 - - 
Thumperton Beach, Eastham, MA 1961 Nov 1979 - - 
Town Neck Beach, Sandwich, MA 1961 Nov 1986 - - 
Wareham-Marion, MA 1965 Aug 1977 81,715 - 
Victory Lake, VT 1967 Aug 1977 168,400 - 
West Brookfield Reservoir, MA 1948 July 1960 67,000 - 
West Canaan Lake, NH 1948 Aug 1977 92,000 - 
Westerly, RI 1966 Nov 1986 - - 
Westfield, MA 1967 Sep 1969 507,200 - 
Westport, CT 1965 Feb 1970 29,634 - 
Westport Harbor and Saugatuck River, CT 
(uncompleted portion) 1972 Nov 1979 - - 
Williamsville Reservoir, VT 1949 Dec 1944 146,500 - 
Winthrop Beach, MA (uncompleted portion) 1960 Nov 1986 - - 
1 Walnut Beach and impermeable groins. 
1-53

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 1-H 
Study Identification
NAVIGATION ACTIVITIES PURSUANT TO SECTION 107, 
PUBLIC LAW 86-645 (PREAUTHORIZATION) 
Fiscal Year 
Costs 
Bar Harbor, ME 
Bass Harbor, Tremont, ME 
Bass River, MA 
Bucks Harbor, Machiasport, ME 
Gloucester Harbor, Gloucester, MA 
Green Harbor, Marshfield, MA 
Lubec Harbor, ME 
Nasketucket Bay, Fairhaven, MA 
Nantucket Inner Harbor - Polpis, MA 
New London Harbor, CT 
Noank Harbor, Groton, CT 
North Cove, Old Saybrook, CT 
Northeast Harbor, Mt. Desert, ME 
Oak Bluffs Harbor, Oak Bluffs, MA 
Perkins Cove, Ogunquit, ME 
Pig Island Gut, Beals, ME 
Pine Point Harbor, Scarborough, ME 
Pines River, Revere, MA 
Plymouth Harbor, Plymouth, MA 
Provincetown Harbor, MA 
Point Judith Pond, RI 
Saugus and Pine Rivers, MA 
Scituate Harbor, MA 
Stonington Harbor, CT 
Taylor Point, Bourne, MA 
Winthrop Harbor, MA 
Wood Island Harbor, Biddeford, ME 
TABLE 1-I BEACH EROSION ACTIVITIES PURSUANT TO SECTION 103, 
PUBLIC LAW 78-874 (PREAUTHORIZATION) 
Study Identification 
Columbia Point Beach, MA 
Conimicut Beach, Warwick, RI 
Kennebunk Beach, Kennebunk, ME 
Lighthouse Park Beach, CT 
Mosman Park Beach, ME 
North Nantasket Beach, Hull, MA 
Ocean Grove Beach, Swansea, MA 
Prospect Beach, West Haven, CT 
South Middle Beach, Yarmouth, MA 
Sea Gull Beach, Yarmouth, MA 
Town Beaches, CT 
West Haven Beaches, CT 
Woodmont Beach, CT 
1-54 
$ 6,278 
39,113 
13,348 
7,409 
22,069 
19,384 
5,000 
18,059 
17,766 
4,494 
1,920 
4,171 
5,392 
470 
43,558 
15,583 
20,209 
2,443 
17,353 
24,957 
35,834 
32,279 
10,001 
19,949 
13,633 
53,213 
44,752 
Fiscal Year 
Costs 
$ 5,000 
24,224 
4,143 
7,500 
7,500 
40,402 
7,375 
46,301 
15,000 
202 
16,166 
4,487 
33,072 
I - I I I I _ 
I _ - 
I - -

NEW ENGLAND DIVISION 
TABLE 1-J FLOOD CONTROL ACTIVITIES PURSUANT TO SECTION 205, 
PUBLIC LAW 80-858 (PREAUTHORIZATION) 
Fiscal Year 
Study Identification Costs 
Aroostook River, Fort Fairfield, ME $ 73,163 
Assabet River, Berlin, MA 7,500 
Beaver Brook, Londonderry, NH 5,771 
Bell island, Norwalk, CT 3,074 
Canton, E 7,500 
Connectict River, Northampton, MA 6,366 
Housatoni River, Shelton, CT 5,362 
Industrial Area, Waterbury, CT 77,732 
Lake Massasecum, Bradford, NH 7,094 
Mad River, Waterbury, CT 7,069 
Millers River, Athol, MA 6,000 
Minnewawa River, Marlborough, NH 7,171 
Pemigewasset River, Holderness, NH 11,786 
Pemigewasset River, Plymouth, NH 5,000 
Piscataquog River, Goffstown, NH 5,110 
Point of Pines, Revere, MA 22,719 
Quinnipiac River, Wallingford, CT 104,140 
Randolph, ME 7,500 
Rippowam River, Stamford, CT 44,967 
Spicket River, Lawrence, MA 7,500 
Spicket River, Methuen, MA 5,500 
Spicket River, Salem, NH 10,269 
Springfield, MA 24,797 
Sugar River, Claremont, NH 5,000 
Ten Mile River, Cheshire, CT 29 
Wepawaug River, Milford, CT 11,367 
West River, New Haven, CT 209,861 
Winnipesaukee River, NH 247,460 
TABLE 1-K BLACKSTONE RIVER BASIN, MA AND RI 
(See Section 33 of Text) 
RESERVOIR 
Miles 
Above Estimated Federal Cost 
Mouth of 
Black- Reservoir Lands 
stone Height Capacity and 
Name Nearest City River (feet) Type (acre-feet) Construction Damages' Total 
West Hill2 Worcester, MA 25.8 51 Earthfill 12,400 $1,366,902 $940,000 $2,306,902 
1 Includes highway, railroad, and utility relocations. 
2 See individual report for details. 
1-55

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 1-K (Continued) LOCAL PROTECTION PROJECTS 
Miles 
Above Estimated Cost 
Mouth of 
Black- Lands 
stone and 
Location River Type of Structure Construction Damages' Total 
Worcester, MA 48 Diversion tunnel and channel $4,923,500 $1,179,0002 $6,102,500 
Woonsocket, RI 15 Channel improvement 3,740,100 1,069,0003 4,809,100 
Lower Woonsocket, RI 13 Flood wall, conduits and 
channel improvement 8,356,239 435,000 8,791,239 
Blackstone River, Millbury, MA 32 Slope protection '250,000 - 250,000 
Clear River, Burrillville, RI 23 Retaining wall 170,000 - 170,000 
Pawtuxet River, Warwick, RI - Land acquisition 4,125,000 - 4,125,0004 
1 Includes relocations. 
2 $158,000 Federal; $1,021,000 non-Federal. 
3 $300,000 Federal; $769,000 non-Federal. 
4 $3,300,000 Federal; $825,000 non-Federal. 
TABLE 1-L CONNECTICUT RIVER BASIN, VT, NH, MA AND CT 
(See Section 35 of Text) 
DAMS AND RESERVOIRS 
Miles 
Above Estimated Federal Cost 
Mouth of 
Conne- Reservoir Lands 
cticut Height Capacity and 
Name Nearest City River (feet) Type (acre-feet) Construction Damages' Total 
Vermont: 
Union Village2 White River 228.4 170 Earthfill 38,000 $3,186,860 $ 908,300 $4,095,160 
Junction 
North Hartland2 White River 211.7 185 Earthfill 71,400 6,349,225 963,000 7,312,225 
Junction 
North Spiringfield 2 Springfield 191.3 120 Earthfill 50,600 4,781,526 2,050,000 6,831,526 
Ball Mountain2 Brattleboro 178.2 265 Rockfill- 54,600 10,689,298 350,000 11,039,298 
earth 
Townsend2 Brattleboro 168.3 133 Earthfill 33,200 5,520,413 1,878,000 7,398,413 
New Hampshire: 
Surry Mountain2 Keene 174.4 86 Earthfill 32,500 2,448,610 385,000 2,833,610 
Otter Brook2 Keene 171.2 133 Earthfill 18,300 2,982,048 1,378,400 4,360,448 
Massachusetts: 
Birch Hill 2 Gardner 153.3 56 Earthfill 49,900 1,740,679 3,075,000 4,815,679 
Tully2 Athol 148.7 62 Earthfill 22,000 1,298,752 368,000 1,666,752 
Barre Falls2 Worcester 130.2 62 Rockfill- 24,000 1,928,819 39,000 1,967,819 
earth 
Knightville2 Northampton 102.8 160 Earthfill 49,000 2,594,440 821,200 3,415,640 
Littleville2 Northampton 102.0 150 Earthfill 32,400 5,863,412 1,150,000 7,013,412 
Conant Brook2 Springfield 122.0 85 Rockfill- 3,740 1,935,530 1,015,000 2,950,530 
earth 
Connecticut: 
Colebrook River 2 Winsted 116.0 223 Rockfill- 98,500 8,341,971 5,922,000 14,263,971 
earth 
Mad River Winsted 120.0 178 Earthfill 9,700 4,773,020 2,210,0004 6,983,020 
Sucker Brook Winsted 118.5 68 Earthfill 1,480 2,227,712 180,000' 2,407,712 
SIncludes highway, railroad, and utility relocations. 
2 For details, see individual report. 
3 Non-Federal cost. 
4 Non-Federal $670,000; Federal $1,540,000. 
1-56

NEW ENGLAND DIVISION 
TABLE 1-L (Continued) LOCAL PROTECTION PROJECTS 
Miles 
Above Estimated Cost 
Mouth of 
Conne- Lands 
cticut and 
Location River Type of Structure Construction Damages1 Total 
Beaver Brook, Keene, NH 170.4 Channel improvement $ 2,525,869 - $ 2,525,869 
Charlestown, NH 181 Riverbank protection 113,330 - 113,330 
Chicopee, MA 80 Wall and levee 1,434,000 $ 250,000 1,684,000 
Chicopee Falls, MA 83 Wall and levee 2,600,000 70,000 2,670,000 
East Hartford, CT 52 Wall and levee 2,135,447 271,000 2,406,447 
Folly Brook, Wethersfield, CT 50 Channel improvement 220,284 - 220,284 
Gardner, MA 163 Dam and levee 495,691 35,000 530,691 
Hartford, CT 52 Wall and levee 6,930,0004 1,150,000 8,080,000 
Hartford, VT 216 Channel improvement 332,236 - 332,236 
Holyoke, MA 85 Wall and levee 3,418,000 150,000 3,568,000 
Huntington, MA 100 Riverbank protection 3,900 - 3,900 
Israel R., Lancaster, NH 314 Gabion overflow weir 551,606 - 551,606 
Keene, NH 167 Channel improvement 44,100 - 44,100 
Mill Brook, Brownsville, VT 200.3 Streambank stabilization 94,217 - 94,217 
Northampton, MA 94 Wall and levee 960,0005 150,000 1,110,000 
North Stratford, NH 345 Slope protection 180,000 - 180,000 
Park River, CT2 51 Conduit 60,164,740 1,300,000 61,464,740 
Riverdale, MA 80 Wall and levee 1,138,000 50,000 1,188,000 
Salmon R., Colchester, CT2 38 Slope protection 247,100 - 247,100 
South River, Conway, MA 107 Slope protection 126,885 - 126,885 
Springdale, MA 84 Wall and levee 700,000 57,000 757,000 
Springfield, MA 76 Wall and levee 932,0006 272,000 1,204,000 
Three Rivers, MA 98 Wall and levee 1,577,189 700,000 2,277,189 
Ware, MA 110 Channel improvement 400,000 85,000 485,000 
Weston, VT 195 Channel improvement 13,000 2,000 15,000 
West Springfield, MA 76 Wall and levee 1,579,0003 30,000 1,609,000 
West Warren, MA 111 Wall and levee 389,200 64,000 453,200 
Winsted, CT 115 Channel improvement 245,500 30,000 275,500 
1 To be borne by local interests. Also includes local interests 4 Includes $835,000 Public Works Administration funds. 
portion of relocation. 5 Includes $280,000 Public Works Administration funds. 
2 For details see individual report. 6 Includes $355,000 Public Works Administration funds. 
3 Includes $245,000 Public Works Administration funds. 
TABLE 1-M HOUSATONIC RIVER BASIN, CT AND MA 
(See Section 37 of Text) 
DAMS AND RESERVOIRS 1 
Miles 
Above Estimated Federal Cost 
Mouth of 
Nagua- Reservoir Lands 
tuck Height Capacity and 
Name Nearest City River (feet) Type (acre-feet) Construction Damages 2 Total 
Hall Meadow 4 Torrington, CT 41.0 73 Rock and 8,620 $2,572,357 $1,290,0008 $3,862,357 
earthfill 
East Branch5 Torrington, CT 43.7 92 Earthfill 4,350 1,959,836 1,290,0003 3,249,836 
Thomaston Torrington, CT 30.5 142 Rock and 42,000 6,382,112 7,900,000 14,282,112 
earthfill 
Northfield Brook Torrington, CT 30.6 118 Earthfill 2,432 1,875,512 975,000 2,850,512 
Black Rock Waterbury, CT 29.0 154 Earthfill 8,700 5,223,700 2,958,600 8,182,300 
Hancock Brook Waterbury, CT 25.0 57 Earthfill 4,030 1,593,911 2,585,000 4,178,911 
Hop Brook Waterbury, CT 15.9 97 Earthfill 6,970 2,701,562 3,450,000 6,151,562 
1 For details of projects, see individual reports. 
2 Includes highway, railroad, and utility relocations. 
3 Includes cost of lands borne by local interests. 
4 For last full report, see Annual Report for 1970. 
5 For last full report, see Annual Report for 1973. 
1-57

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 1-M (Continued) LOCAL PROTECTION PROJECTS1 
Miles 
Above Estimated Cost 
Mouth of 
Housa- Lands 
tonic and 
Location River Type of Structure Construction Damages 2 Total 
Alford, Green River, MA 111.0 Earth dike and stone slope $ 41,419 $ - $ 41,419 
protection 
Ansonia-Derby, CT 13.0 Wall, levee, channel 18,266,040 1,178,000 19,444,040 
improvement and pumping 
station 
Danbury, CT 56.0 Walls, channel improvement 13,143,000 1,862,000 15,005,000 
and bridge replacememt 
Derby, CT 12.0 Walls, levees and pumping 7,582,642 647,000 8,229,642 
station 
North Canaan, Blackberry 83.0 Snagging and clearing 73,865 - 73,865 
River, CT project 
Pittsfield, MA 133.0 Stone arch culvert 739,003 85,000 824,003 
Salisbury, CT 76.0 Gabionade with slope 102,800 - 102,800 
protection 
Sheffield, MA 96.0 Stone slope protection 202,608 - 202,608 
Squantz Pond, New 43.0 Timber Bulkhead 116,296 - 116,296 
Fairfield, CT 
Torrington, East Branch, CT 51.0 Dike and channel 389,200 - 389,200 
improvement 
Torrington, West Branch, CT 52.0 Walls, dikes and channel 228,300 - 228,300 
Waterbury- Watertown, CT 32.0 Wall, dike and channel 263,300 - 263,300 
1 For details of projects, see individual reports. 
2 To be borne by local interests. Includes relocations. 
1-58

NEW ENGLAND DIVISION 
TABLE 1-N MERRIMACK RIVER BASIN, NH, AND MA 
(See Section 40 of Text) 
RESERVOIRS 
Miles 
Above Estimated Federal Cost 
Mouth of 
Merri- Reservoir Lands 
mack Height Capacity and 
Name Nearest City River (feet) Type (acre-feet) Construction Damages' Total 
Franklin Falls2 Franklin, NH 118.2 140 Earthfill 154,000 $ 6,190,487 $ 1,760,000 $ 7,950,487 
Blackwater 2 Concord, NH 118.8 75 Earthfill 46,000 766,746 553,000 1,319,746 
Hopkinton-Everett 2,4 Concord, NH 87.3 115 Earthfill 157,300 12,715,440 8,737,000 21,452,440 
Edward MacDowell2 Keene, NH 161.3 67 Earthfill 12,800 1,708,253 306,000 2,014,253 
Phillips Fitchburg, MA 105.4 48 Earthfill 1,600 13,450,000 7,350,000 20,800,0003 
Whitmanville Fitchburg. MA 110.6 76 Earthfill 9,350 11,590,000 6,210,000 17,800,000 
1 Includes highway, railroad, and utility relocations. 4 Substituted for Bennington and Beards Brook. Distance 
2 For details, see individual report. and height are for Everett Dam. Distance and height for 
3 Based on "large" Phillips plan which would eliminate Hopkinton Dam are 118 miles and 76 feet, respectively. 
Nookagee Lake. 
LOCAL PROTECTION PROJECTS 
Miles 
Above Estimated Cost 
Mouth of 
Merri- Lands 
mack and 
Location River Type of Structure Construction Damages' Total 
Amesbury, Powwow and 3.0 Wall and reventment $ 132,113 $ - $ 132,113 
Merrimack Rivers, MA 2 
Nashua, NH2 55.0 Wall and levee 270,000 3,000 273,0004 
Lowell, MA2 39.0 Wall and levee 490,6005 90,000 580,600 
North Nashua River, MA2,3 100.5 Channel improvement 3,235,000 - 3,235,000 
Saxonville, MA2 69.0 Wall, levee, channel 4,218,700 530,000 4,748,700 
1 To be borne by local interests. 
2 Project completed. 
a Excludes $1,370,000 Public Works Administration funds 
expended on Fitchburg, MA. 
4 Excludes $15,000 expended from Contributed Funds. 
5 Excludes $794,374 Public Works Administration funds. 
1-59

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 1-0 THAMES RIVER BASIN, CT, RI AND MA 
(See Section 47 of Text) 
RESERVOIRS 
Miles 
Above Estimated Federal Cost 
Mouth 
of Reservoir Lands 
Thames Height Capacity and 
Name Nearest River (feet) Type (acre-feet) Construction Damages1 Total 
Hodges Village2 Webster, MA 74.5 55 Earthfill 13,000 $1,317,268 $3,144,000 $4,461,268 
Buffumville2 Webster, MA 74.4 66 Earthfill 12,700 2,157,603 841,000 2,998,603 
East Brimfield2 Southbridge, MA 82.8 55 Earthfill 30,000 1,337,043 5,720,000 7,057,043 
Westville2 Southbridge, MA 75.2 80 Earthfill 11,000 2,284,683 3,400,000 5,684,683 
West Thompson2 Putman, CT 59.3 70 Earthfill 25,600 5,036,220 1,965,000 7,001,220 
Mansfield Hollow2 Willimantic, CT 40.0 70 Earthfill 52,000 4,107,164 2,340,000 6,447,164 
1 Includes highway, railroad, and utility relocations. 
2 For details, see individual report. 
LOCAL PROTECTION PROJECTS 
Miles Estimated Cost 
Above 
Mouth of Lands 
Thames and 
Location River Type of Structure Construction Damages' Total 
Norwich, CT 15.0 Channel improvements $1,209,000 $72,000 $1,281,000 
1 Borne by local interests. 
TABLE 1-P BOSTON HARBOR, MA 
Total Federal Cost for Existing Project to September 1987 
Funds New Work Maintenance Total 
Regular $21,881,851 $9,166,295 $31,048,146 
Public Works 1,030,806 - 1,030,806 
Emergency Relief 935,303 - 935,303 
$23,847,960 $9,166,2951 $33,014,255 
1 Excludes $17,767 contributed funds. 
1-60

NEW ENGLAND DIVISION 
TABLE 1-Q RECONNAISSANCE AND CONDITION SURVEYS 
Date Survey Date Survey 
Project Conducted Project Conducted 
Massachusetts 
Connecticut River below 
Hartford, Wethersfield Cove 
Housatonic River 
Annisquam River 
Dec 1986 Boston Harbor, Reserve Channel 
Dec 1986 Boston Harbor, 35-foot Anchorage 
and Channel; 40-foot Main Channel 
Cuttyhunk Harbor 
EdgartownIarbor, Martha's Vineyard 
Lagoon Pond, Tisbury, Martha's Vineyard 
Menemsha Creek, Martha's Vineyard 
Nantucket Harbor 
Newburyport Harbor 
Salem Harbor, South River 
and Derby Wharf 
Salem Harbor 
Vineyard Haven Harbor 
New Hampshire 
Kennebec River, Vicinity of 
Doubling Point 
Kennebec River, Vicinity of 
Popham Point 
Saco River 
Wells Harbor 
Wood Island Harbor and 
the Pool at Biddeford 
Nov 1986 
Nov 1986 
Sep 1987 
May 1987 
Mar 1987 
Portsmouth Harbor, Piscataqua 
River, Vicinity of Simplex Pier 
Rhode Island 
Block Island, Entrance to 
Great Salt Pond 
1-61 
Connecticut 
Maine 
Jun 1987 
Mar 1987 
Mar 1987 
Sep 1987 
Oct 1986 
Oct 1986 
Oct 1986 
Dec 1986 
Sep 1987 
Jun 1987 
Jun 1987 
Oct 1986 
Mar 1987 
Jun 1987

NEW YORK, N.Y. DISTRICT* 
This district comprises western Vermont, small 
portions of western Massachusetts and Connecticut, eastern 
New York including Long Island, and northeastern New 
Jersey, embraced in the drainage basins tributary to Lake 
Champlain and St. Lawrence River system east thereof and 
to the Atlantic Ocean from New York-Connecticut State line 
to, but not including Manasquan Inlet, N.J. It exercises 
jurisdiction, however, over all matters pertaining to improvement 
of Great Lakes to Hudson River waterway. Under the 
direction of the Secretary of the Army, the District Engineer, as 
Supervisor of New York Harbor, also exercises jurisdiction 
under the laws enacted for the preservation of the tidal waters 
of New York Harbor, its adjacent or tributary waters, and the 
waters of Long Island Sound. 
IMPROVEMENTS 
Aquatic Plant Control ................................................................. 2-2 
Bay Ridge-Red Hook Channels. N.Y..................................2-2 
Bronx River, N.Y ........................................................................ 2-2 
Browns Creek, N.Y.....................................................................2-3 
East Chester Creek, N.Y............................................................2-4 
East Rockaway Inlet, N.Y........................................................2-4 
ire Island to Jones Inlet, N.Y.................................................2-5 
Hudson River, N.Y.....................................................................2-5 
Jones Inlet, N.Y ........................................................................... 2-6 
Kill Van Kull-Newark Bay, N.J. & N.Y.............................2-7 
Lake Montauk Harbor, N.Y.....................................................2-7 
Long Island Intra Coastal W/W, N.Y...................................2-8 
Moriches Inlet, N.Y..................................................................... 2-8 
Narrows of Lake Champlain, N.Y.......................................2-8 
Newark Bay, Hackensack & Passaic 
Rivers, N.J ......................................................................... 2-9 
New York and New Jersey Channels................................2-10 
New York Harbor-Collection and 
Removal of drift..............................................................2-11 
18. New York Harbor-Entrance Channels & 
Anchorage areas ............................................................. ..2-11 
Raritan River, NJ.................................................................2-12 
Rondout Harbor, N.Y.................................................................2-13 
Shark River, NJ...........................................................................2-13 
Shinnecock Inlet, N.Y.................................................................2-14 
Westchester Creek, N.Y............................................................2-14 
Supervisor of New York Harbor...........................................2-15 
Reconnaissance and Condition Surveys............................2-15 
Other authorized navigation projects................................2-15 
Navigation work under special authorization................. 2-16 
32. 
33. 
34. 
35. 
36. 
37. 
38. 
39. 
40. 
Ardsley, N .Y................................................................................... 2-17 
Liberty State Park Levee and Seawall, NJ...... ............. 2-18 
Passaic River Basin, N.J. & N.Y. Phase I...........................2-18 
Sawmill River Elmsford-Greenburgh, N.Y......................2-19 
Inspection of completed flood control projects...............2-19 
Other authorized flood control projects.............................2-19 
Dam Safety Program................................................................2-19 
Flood control work under special authorization.............2-20 
Emergency streambank and shoreline 
protection under special authorization...................2-20 
General Investigations 
41. 
42. 
43. 
Surveys.....................................................................................2-20 
Collection and study of basic data........................................2-20 
Deauthorized projects ............................................................... 2-20 
Tables 
Table 2-A Cost & Financial Statement.....................................2-21 
Table 2-B Authorizing Legislation ............................................. 2-26 
Table 2-C Hudson River, N.Y. Features of Lock 
and Dam Included in Existing Project............2-31 
Table 2-D Total Costs for Existing Project..............................2-31 
Table 2-E Supervisor of New York Harbor 
Statement of Activities........................................... 2-31 
Table 2-F Reconnaissance and Condition Surveys............2-32 
Table 2-G Other Authorized Navigation Projects...............2-33 
Table 2-H Other Authorized Beach Erosion Control 
P jts2-3 
Beach Erosion Control 
28. East Rockaway Inlet to Rockaway Inlet and 
Jamaica Bay, N.Y. (Part I)..........................................2-16 
29. Sandy Hook to Barnegat Inlet, N.......................................2-16 
30. Other Authorized Beach erosion control projects..........2-17 
31. Beach erosion control work under 
special authorization.......................................................2-17 
l ec : ......................................................................... c Table 2-I Other Authorized Flood Control Projects..........2-35 
Table 2-J Surveys ............................................................................. 2-36 
Table 2-L Costs for Flood Plain Management Services...2-36 
Table 2-M Deauthorized Projects................................................2-36 
Table 2-N Section 107 Continue Reconnaissance 
Repcrt.........................................................................2-37 
Table 2-0 Section 103 Continue Reconnaissance 
Rep .......................................................................... 2-38 
Table 2-P Section 205 Continue and Complete 
Reconnaissance Reports ..................................... 2-38 
Table 2-Q Section 14 Complete Reconnaissance 
Report and Planss and Specs ............................. 2-38 
2-1 
Navigation Page Flood Control 
1. 
2. 
3. 
4. 
5. 
6. 
7. 
8. 
9. 
10. 
11. 
12. 
13. 
14. 
15. 
16. 
17. 
Page 
19. 
20. 
21. 
22. 
23. 
24. 
25. 
26. 
27.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987, 
Navigation 
1. AQUATIC PLANT CONTROL 
Location. Navigable waters, tributary streams, 
connecting channels, and other allied waters in 
New York District. 
Existing Project. Provides for control and progressive 
eradication of water-hyacinth, alligatorweed, 
Eurasian water milfoil, and other obnoxious 
aquatic plant growths, from the navigable waters, 
tributary streams, connecting channels, and other 
allied waters of the United States, in the combined 
interest of navigation, flood control, drainage, 
agriculture, fish and wildlife conservation, public 
health, and related purposes, including continued 
research for development of the most effective and 
economic control measures. (See Table 2-B for 
Authorizing Legislation.) 
Local cooperation. Local interests were required 
to provide 30 percent of the cost of the program except 
as modified by 1962 River and Harbor Act and agree 
to hold the United States free from damages. The 
Water Resources Development Act of 1986 changed 
the local responsibility from 30% to 50%. However in 
FY 87 the States involved in the program were 
permitted to keep the cost sharing at 30% by order of 
the Secretary of the Army. Starting FY 88 local 
sponsors must be prepared to contribute 50% of the 
costs. 
Operations and results during period. FY1987 has 
been the sixth year of a ten year control program, 
started in FY 1982, for the removal of nuisance 
aquatic plants in Lake Champlain. This work was 
performed for the removal of water chestnut in the 
southern part of the lake and Eurasian milfoil in St. 
Albans Bay at a cost of $243,000. 
Condition as of September 30. Reconnaissance 
report covering the aquatic plant problems of the 
North Atlantic Division area was completed in 
August 1967. Planning for the water chestnut control 
in the Hudson-Mohawk basin was completed by the 
New York District, contracts for $189,363 
accomplished during FY 1970 through FY 1976. The 
General Design Memorandum for this program was 
completed in March 1982 by the State of Vermont. 
The total Federal cost of this control program to date 
is $1,229,350. 
2. BAY RIDGE AND RED HOOK 
CHANNELS, N.Y. 
Location. These channels lie along east shore of 
Upper Bay, New York Harbor and, with Buttermilk 
Channel, form an easterly channel along Brooklyn 
waterfront from the Narrows to East River. (See 
National Ocean Survey Charts 12327 and 12334). 
Previous projects. For details see Annual Reports 
for 1915 and 1938, pages 1768 and 195, respectively. 
Existing projects. A channel 1,200 feet wide and 40 
feet deep at mean low water from the Narrows to Bay 
Ridge Avenue, Brooklyn, thence 1,750 feet wide to 
junction of Bay Ridge and Red Hook channels, 
thence 1,200 feet wide through Red Hook Channel to 
junction with Buttermilk Channel and a channel of 
same depth extending into Gowanus Bay from 
junction of Bay Ridge Channel with Red Hook 
channel, narrowing uniformly in width to about 500 
feet at 28th Street, Brooklyn. Section included in 
project is 4 miles long. Mean tidal range, 4.7 feet; 
mean range of spring tides, 5.6 feet; irregular 
fluctuations due to wind and atmospheric pressure 
vary from 3.9 feet below mean low water up to 5.2 feet 
above mean high water. New work for completed 
project cost $4,277,197, exclusive of amounts 
expended on previous projects. (See Table 2-B for 
Authorizing Legislation). 
Local cooperation. None required. 
Terminal facilities. See Port Series No. 5, revised 
1978. Vol. 2. 
Operations and results during period. A 
continuing contract in the amount of $2,746,622 for 
the removal of approximately 823,000 cubic yards of 
material, except ledge rock, lying above the plane of 
40 feet below mean low water in specified sections of 
Bay Ridge and Red Hook Channels, N.Y. with 
satisfactory disposal of the dredged material at the 
EPA approved Mud Dump site in the Atlantic Ocean 
was awarded on September 8, 1986 to Gulf Coast 
Trailing Company. Operations and Maintenance 
funds in the amount of $48,776 was expended on 
engineering and design and surveys. A total of 
351,694 cubic yards of material was removed during 
FY 1987 from the Red Hook Section of the project of 
which 87,593 cubic yards was excess over depth and 
side slopes. The dredging work commenced on 24 
October, 1986 and completed 23 February 1987. 
Operations and maintenance funds in the amount of 
$2,847,961 was expended on engineering and design, 
supervision and administration, and contract work 
for this project. 
Condition as of September 30. Work under 
existing project was commenced March 1901 and 
completed June 1940. 
3. BRONX RIVER, N.Y. 
Location. Empties into a shallow bay in north 
shore of East River, 11 miles by water northeast of the 
Battery, New York City. (See National Ocean 
Survey Chart 12339.) 
Previous projects. For details see Annual Report 
for 1915, page 1762, and Annual Report for 1938, page 
166. 
Existing project. A channel 10 feet deep at mean 
low water and 100 feet wide to extend from deep water 
in East River to the head of navigation at the dam at 
East 172nd Street, involving the first dredging from 
2-2

NEW YORK, N.Y. DISTRICT 
East River at Randall Avenue to a width of 200 feet; 
thence to Spofford Avenue, 150 feet; thence to Watson 
Avenue, 125 feet; thence to railroad bridge near 
Westchester Avenue, 100 feet, except in southern 
approach to bridge, where it is to be 140 feet. Section 
included in project is about 2.4 miles long. Mean 
tidal range is 6.9 feet in the estuary; mean range of 
spring tides, 8.2 feet; irregular fluctuations due to 
wind and barometric pressure vary from 4 feet below 
mean low water up to 8.5 feet above mean high water. 
New work for completed active portion of project as 
described above cost $1,080,910, exclusive of amounts 
expended under previous projects, and exclusive of 
$10,000 contributed by local interests. Channel 
widening from Westchester Avenue to East 172d 
Street is considered inactive and excluded from 
foregoing description of existing project and cost 
estimate. (See Table 2-B for Authorizing 
Legislation.) 
Local cooperation. River and Harbor Act of 1913, 
provides that any right-of-way that may be 
necessary for the execution of the project shall be 
furnished free of cost to the United States. Right-ofway 
within bulkhead lines below Westchester 
Avenue Bridge was accepted by Chief of Engineers 
June 1920, and above the Westchester Avenue Bridge 
October 28. On September 10, 1940, the Chief of 
Engineers approved releases from damages 
furnished by adjoining property owners between 
Westchester Avenue and East 172nd Street. On 
November 12, 1940, the Chief of Engineers approved 
an agreement under which City of New York would 
reimburse the United States for cost of a retaining 
wall to protect adjoining property in reach of river 
between Westchester Avenue and New York, New 
Haven and Hartford Railroad bridge in lieu of 
furnishing additional right-of-way. On October 28, 
1940, the Secretary of War authorized the acceptance 
of $10,000 from the city of New York to defray the cost 
of retaining wall. Additional right-of-way required 
in the section below East 172d Street has not been 
furnished. City of New York indicated it does not 
feel justified in acquiring any additional land 
along the river. 
Terminal facilities. See Port Series No. 5, revised 
1978, Vol. 2. 
Operations and results during period. A lump 
sum contract in the amount of $671,313 for the 
removal of all material except ledge rock lying 
above the plane of 10 and 12 feet below mean low 
water in specified sections of Bronx River, N.Y. 
with satisfactory disposal of the dredged material at 
the EPA approved Mud Dump site in the Atlantic 
Ocean, was awarded on 24 April 1986, to Weeks 
Dredging Company. The dredging work 
commenced on 5 August 1986 and was substantially 
completed on 10 October 1986. However, due to hard 
material encountered under and above the Bruckner 
Boulevard Bridge, probing was required to 
determine depths attainable. Following completion 
of probing, the work was substantially completed on 
5 February 1987. Operations and Maintenance 
funds in the amount of $11,516 as of 30 September 1987 
was expended for engineering and design, 
supervision and administration for this project 
during FY 1987. 
Condition as of September 30. Work under entire 
existing project is about 82 percent complete. Active 
portion of existing project was commenced in 1914 
and completed in 1941. Work remaining under 
existing project consists of widening reach between 
Westchester Avenue Bridge and East 172d Street. 
Channel between 172d Street and the upper limit of 
authorized project was filled in by City of New York 
under a Department of the Army permit and is no 
longer a waterway. 
4. BROWNS CREEK. N.Y. 
Location. A narrow, crooked tidal stream 
emptying into Great South Bay, near Sayville, Long 
Island, N.Y., about 15 miles by water northeast of 
Fire Island Inlet, and about 65 miles by water east of 
New York City. (See National Ocean Survey Chart 
12352.) 
Existing project. A channel 100 feet wide and 6 feet 
deep at mean low water from 6-foot contour in Great 
South Bay for 1,850 feet, and thence, with same width, 
4 feet deep for 1,350 feet; also for two stone jetties to 
protect the entrance, east jetty to be 448 feet long and 
west jetty 700 feet long. Section included in project is 
about 0.6 mile. Mean tidal range, 0.6 feet; mean 
range of spring tides 0.7 feet; irregular fluctuations 
due to wind and atmospheric pressure vary from 1.8 
feet below mean low water up to 3.2 feet above mean 
high water. Cost of new work for completed portion 
of project is $33,976. Dredging of channel to a depth 
of 4 feet for 3,300 feet northward to upper limit of 
project and extension of jetties; east jetty to 1,400 feet 
long and west jetty 1,600 feet long were deauthorized 
in 1977. (See Table 2-B for Authorizing 
Legislation.) 
Local cooperation. None required. 
Terminal facilities. Numerous terminals, 
including several ferries, with a total available 
dockage of 7,980 feet, are scattered along shore of 
creek between its mouth and head of improved 
channel. Three are publicly owned; all are open to 
the public. None has rail connections. Facilities 
are considered adequate for existing commerce. 
Operations and results during the period. A 
continuing contract in the amount of $117,132 for the 
removal of approximately 20,392 cubic yards of 
material, except ledge rock lying above the planes of 
6 feet and 4 feet below mean low water with disposal 
of the dredged material on a confined upland 
disposal site was awarded to Gibson & Cushman 
Dredging Corporation on 26 September 1986. 
2-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Operations and maintenance funds in the amount of 
$18,412 was expended on engineering design and 
surveys. A total of 24,751 cubic yards of material 
was removed, of which 6,580 cubic yards was excess 
over depth and side slopes. The work commenced on 
12 November 1986 and completed on 15 December 
1986. Operations and maintenance funds in the 
amount of $149,588 was expended on engineering 
and design, supervision and administration, and 
contract work for this project during FY 1987. 
Condition as of September 30. Work under 
existing project was commenced August 1891 and 
completed July 1927. East jetty was completed to a 
length of 448 feet in 1893. West jetty was completed to 
a length of 492 feet in 1892 and extended in 1927 to a 
total length of 700 feet. Six-foot channel has been 
completed. Four-foot channel has been.completed for 
1,350 feet. 
5. EAST CHESTER CREEK, N.Y. 
Location. This creek, also known as Hutchinson 
River, is a small tidal stream emptying into East 
Chester Bay, an indentation in north shore of Long 
Island Sound immediately north of Throgs Neck, 12 
miles southwest of Connecticut State line and 21 
miles by water northeast of the Battery, New York 
City. (See Coast and Geodetic Survey Chart 12366) 
Previous projects. For details see Annual Reports 
for 1915, 1929, 1938 and 1949, pages 1761, 167,163, and 
208, respectively. 
Existing project. A channel 10 feet deep at mean 
low water and generally 150 feet wide from Long 
Island Sound through East Chester Bay to a point 700 
feet below Boston Post Road Bridge, and thence 70 
feet wide extending to a point where the creek divides 
into a Y, thence approximately 1,000 feet into east 
branch of the Y and approximately 500 feet into west 
branch of the Y; a passing basin south of Boston Post 
Road Bridge; widening channel at Boston Post Road 
Bridge; and construction of a check dam.,at head of 
navigation. Section included in project is 5 miles. 
Mean tidal range, 7.3 feet in the estuary; mean 
range of spring tides, 8.6 feet; irregular fluctuations 
due to wind and atmospheric pressure vary from 3.9 
feet below mean low water up to 8.1 feet above mean 
high water. Estimate of cost for new work is 
$2,550,000 (October 1976) exclusive of amounts 
expended on previous projects and inclusive of an 
estimated $40,000 non-Federal cost for lowering 
utilities, (See Table 2-B for authorizing legislation.) 
Local cooperation. River and Harbor Act of May 
17, 1950, provides that local interests furnish lands, 
rights-of-way, and suitable areas for disposal of 
dredged material during construction and future 
maintenance, and hold the United States free from 
damages. City of New York has complied with 
requirements. Assurances are yet to be received 
from other local interests concerned with 
improvement. 
Terminal facilities. See Port Series No. 5, revised 
1965, Vol. 2, Part 2. 
Operations and results during period. Operations 
and results during period. Operations and 
maintenance funds in the amount $47,489.00 was 
expended on reconnaissance surveys, engineering 
and design and bulkhead stability analysis study 
for the maintenance of the "Y" shaped portion of this 
project, authorized under Water Resources Act of 
1988. 
Condition as of September 30. No work has been 
accomplished under the existing project. Work 
under the 1930 project was completed in August 1941. 
6. EAST ROCKAWAY INLET, N.Y. 
Location. On south shore of Long Island between 
main body of island and western end of Long Beach. 
It is 10 miles east of Rockaway Inlet and about 27 
miles by water south and east from the Battery, New 
York City. (See National Ocean Survey Chart 
12353.) 
Existing project. A channel 12 feet deep at mean 
low water and 250 feet wide from 12-foot contour in 
Long Beach Channel protected by a jetty. Mean tidal 
range, 4.3 feet; mean range of spring tides, 5.2 feet; 
irregular fluctuations due to wind and atmospheric 
pressure vary from 3.9 feet below mean low water up 
to 5.6 feet above mean high water. New work for 
completed project cost $603,969, including $100,000 
contributed funds. (See Table 2-B for Authorizing 
Legislation.) 
Local cooperation. Complied with. 
Terminal facilities. There are 39 terminals in 
Oceanside, Island Park, Long Beach, and East 
Rockaway. Nine of these are oil terminals, one of 
which has a railroad spur. Other terminals are 
repair and mooring docks with a berthage of 7,655 
feet. Of these, 21 have marine railways and 1 has 
mechanical-handling facilities. There are public 
wharves at East Rockaway and Woodmere. 
Waterfront on north side of Long Beach has been 
bulkheaded. Facilities are considered adequate for 
existing commerce. 
Operations and results during period. Operations 
and maintenance funds in the amount of $49,360.00 
was expended during FY 1987 on engineering and 
design to accomplish dredgning in FY 1988. 
Condition as of September 30. Work under 
existing project began February 1933 and is 100 
percent complete. East jetty, 4,250 feet long, was 
completed in July 1834. Project channel was 
completed in May 1935. 
2-4

NEW YORK, N.Y. DISTRICT 
7. FIRE ISLAND TO JONESINLET, 
N.Y. 
Location. On south shore of Long Island, about 50 
miles by water south and east of the Battery, New 
York City. Fire Island Inlet is the main entrance 
into Great South Bay from the Atlantic Ocean. (See 
National Ocean Survey Chart 12352.) 
Existing project. A jetty at Fire Island Inlet 
extending generally southwest and south for 5,000 
feet from high ground on Democrat Point at the west 
end of Fire Island and a channel generally parallel 
to the jetty 18 feet deep and 500 feet wide from a 
littoral reservoir (sediment trap) in the ocean to deep 
water in the inlet. Mean tidal ranges at the ocean 
and inlet ends of Democrat Point are 4.1 ft. and 2.4 
ft. respectively. Irregular fluctuations due to wind 
and atmospheric pressure vary from 2.5 feet below 
mean low water up to 6.2 feet above mean high water 
on the ocean side. (See Table 2-B for Authorizing 
Legislation.) 
Local cooperation. Requires cost sharing and 
lands, easements & rights-of-way. 
Terminal facilities. None within the area 
immediately adjacent to the Federal improvements. 
Operations and results during the period. At the 
request of local interests, maintenance dredging of 
the project channel was postponed in 1979 until the 
completion of an Inlet Dynamic Study. The 
residents of Oak Beach contend that dredging the 
Inlet exposes Oak Beach to direct wave attack thereby 
causing an erosion problem. The Inlet Dynamic 
Study was completed in 1985; study results showed 
the project to be economically justified, that there 
were no significant salinity effects on Great South 
Bay and that there were no anticipated adverse 
effects on wildlife or the environment. 
Condition as of September 30. Work under the 
existing project was commenced in late 1973. As a 
result of three consecutive dredging operations 
completed in 1977, the project channel was brought to 
the approximate authorized dimension at that time. 
Due to the aforementioned local concerns 
maintenance has been deferred since 1979 which has 
allowed the complete shoaling of the authorized 
project channel. To facilitate navigation in this 
period the existing natural channel was dredged in 
FY 1985 and in FY 1987. In FY 1987 sand was 
deposited offshore of Gilgo Beach by hopper dredge. 
422,460 cy was dredged at a cost of $882,000 operations 
and maintenance funds. 0 & M funds of $320,400 
was also expended on a continuing contract for jetty 
repair work. Plans and specifications for the 
authorized project are being prepared and 
alternative courses of action are still being 
examined. 
8. HUDSON RIVER, N.Y. 
Location. Originates in Adirondack Mountains, 
about 250 miles in a direct line and 315 miles along 
its course from the Battery, New York City, and 
flows generally southerly into New York Bay. 
Section under improvement extends from New York 
City about 156 miles to Waterford. (See National 
Ocean Survey Charts 12335,12341,12343,12347,12348, 
and 14786.) 
Previous projects. For details see Annual Reports 
for 1915 and 1938, pages 1764 and 226, respectively. 
Existing projects. A channel 600 feet wide from 
New York City to Kingston and thence 400 feet wide 
to Albany, with widening at bends, a turning basin 
700 feet wide and 1,200 feet long at Albany, and 2 
anchorages, 1 near Hudson and 1 near Stuyvesant, 
each 400 feet wide and an average length of 2,400 
feet; all with depths of 32 feet in soft material and 34 
feet in rock to 2,200 feet south of the Mall Bridge; 
thence 27 feet deep and 400 feet wide to 900 feet south of 
the Mall Bridge, thence 14 feet deep at lower low 
water and generally 400 feet wide to Federal lock at 
Troy; and thence of same depth and 200 feet wide to 
southern limit of State barge canal at Waterford; 
and removal of State dam at Troy and construction 
of a lock and dam about 2.5 miles below Waterford. 
Channel is to be formed by dredging and rock 
excavation, and maintained by dredging and 
constructing new, and raising and repairing old, 
longitudinal dikes, built partly under previous 
projects and partly by the State of New York. Mean 
range of pool elevation above Federal dam at Troy, 
in seasons of moderate rains, is about 2.2 feet, as 
determined in 1934. Mean tidal range is about 4.8 
feet between May and October and 5.1 feet between 
July and September at Albany, extreme range due to 
freshets is 33.1 and 25.9 feet, respectively normal 
pool level above Federal dam from Troy to 
Waterford is 14.33 feet above mean sea level. In 
tidal section of river below dam, assumed lowest low 
water plane from Troy to Albany is 3 feet below 
mean sea level. (See Table 2-C for features of lock 
and dam included in existing project.) New work 
for completed project cost $39,050,019 exclusive of 
amounts of expended on previous projects. 
Widening to form harbors at Albany and Troy, 
N.Y., to 12 feet deep at a cost of $522,000 (1954) and 
completion of 27-foot channel at Albany at a cost of 
$642,000 (1957) was placed in deferred for restudy 
category. All three features of work are excluded 
from foregoing description of existing project and 
cost estimate. Construction of mooring facilities has 
been authorized. (See Table 2-B for Authorizing 
Legislation.) 
Local cooperation. Complied with except that local 
interests must furnish suitable soil disposal areas 
for future maintenance as required. 
Terminal facilities. See Port Series No. 6. 
2-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Operations and results during period. A contract 
in the amount of $2,964,000 was awarded on August 
18, 1986 to North American Trailing Company for 
removal of approximately 497,500 cubic yards of 
material. The 3,600 cubic yard hopper dredge Sugar 
Island began work on 25 September 1986 and 
completed work on 22 November 1986. The 2,178 
cubic yard hopper dredge Northerly Island assisted 
with the work during the period of 27 October through 
13 November 1986. A total of 572, 132 cubic yards 
dredged material was removed consisting of 349,310 
cubic yards of material above grade and 222,822 of 
allowable over depth. Seeding and other restoration 
work of the dikes and areas disturbed outside the 
exterior dike limits began on June 24, 1987 and 
completed June 26, 1987. Operations and 
maintenance funds in the amount of $2,874,594 was 
expended to accomplish dredging under this 
contract. A continuing contract in the amount of 
$995,250 for the removal of approximately 162,500 
cubic yards of material, except ledge rock lying 
above the plane of 32 feet below mean low water in 
specified areas of Haverstraw Bay area of Hudson 
River with satisfactory disposal of the dredged 
material at the EPA approved Mud Dump site in the 
Atlantic Ocean and awarded on 13 August 1987 to 
Weeks Marine, Inc. Operations and maintenance 
in the amount of $756,223 was expended on 
engineering and design, supervision and 
administration, surveys and contract work during 
FY 1987 for this project. 
Government plant and hired labor were employed 
through the fiscal year in the removal of stumps, 
snags and other obstructions which constituted a 
potential hazard to navigation at a cost of $152,539 for 
maintenance in FY 1987. Government plant and 
hired labor were employed through the fiscal year 
performing dredging and project condition surveys 
at a cost of $212,228 for maintenance in FY 1987. 
Funds in the amount of $24,499 were expended for 
environmental testing and funds in the amount of 
$26,800 were expended for Stream Gauges during FY 
1987. Government plant and hired labor were 
employed throughout the fiscal year with operation 
and maintenance of the Troy Lock and Dam 
including the associated buildings and grounds. 
Operation of the Lock was suspended for the 1986 
navigation season on December 1, 1986 and was 
resumed for the 1987 navigation season on May 4, 
1987. Total cost incurred for the operation and 
maintenance of the Troy Lock and Dam and the 
associated building and grounds was $605,924 for FY 
1987. In addition, contracts in the amounts of 
$103,631 and $57,342 respectively were completed for 
modifications to the Electrical System and 
Fabrication of Pivot Castings at the Troy Lock. An 
on-going A/E contract was also modified in the 
amount of $96,724 for design of required repairs to 
insure continued operability and safety of the Troy 
Lock and Dam. 
Condition as of September 30. Work under 
existing project began in July 1910 and was 
substantially completed in November 1965. New 
lock and dam at Troy, removal of dam at Troy and 
construction of 15,545 linear feet of dikes also are 
complete. In reconstruction of old dikes 39,676 
linear feet were raised to adopted crest height. 
Channel from New York City to Albany is complete 
to a depth of 32 feet except for the 1,500 linear-foot 
section at the northern end of the 32-foot project which 
has never been dredged to project depth. 
Additionally, the 1,300 linear feet of the 27-foot 
project remains undredged. Channel from Albany 
to Waterford is complete to a depth of 14 feet except for 
a small part of the widening to form a harbor at 
Troy. Work remaining under the project consists of 
completion of the 12-foot harbor at Troy and 
dredging the 27-foot and the remainder of the 32-foot 
channels at Albany which are not deemed necessary 
at this time; and reconstruction of dikes. 
9. JONES INLET, N.Y. 
Location. A small inlet on south shore of Long 
Island connecting Hempstead Bay with Atlantic 
Ocean, 37 miles by water southeast of the Battery, 
New York City. (See National Ocean Survey Chart 
12352.) 
Existing project. An entrance jetty and a channel 
12 feet deep and 250 feet wide, from that depth in the 
ocean through the inlet to Loop Causeway Bridge over 
Long Creek. Section included in project is about 2.1 
miles long. Mean tidal range varies from 4.2 feet at 
ocean entrance to 3.1 feet at Loop Causeway Bridge; 
mean range of spring tide varies from 5 to 3.7 feet, 
respectively; irregular fluctuations due to wind and 
atmospheric pressure vary from 3.9 feet below mean 
low water up to 8.5 feet above mean high water. (See 
Table 2-B for Authorizing Legislation.) 
SLocal cooperation. Complied with except that local 
interests must furnish suitable spoil-disposal areas 
for future maintenance as required, and must 
maintain a channel 12 feet deep and generally 200 
feet wide from Loop Causeway Bridge over Long 
Creek to head of navigation in Freeport Creek at 
Mill Road. 
Terminal facilities. Within area tributary to 
Jones Inlet there are a number of privately owned 
small wharves and numerous boat repair and 
storage yards. The latter are equipped for repair of 
pleasure craft and fishing vessels. In addition, 
there are nine public wharves open to the public free 
of charge, with a total dockage of 2,180 feet. 
Additional terminals would have to be constructed 
for receipt of commercial freight in any sizable 
quantity. 
Operations and results during period. A contract 
in the amount of $963,830 for the removal of 
approximately 367,000 cubic yards of material with 
2-6

NEW YORK, N.Y. DISTRICT 
satisfactory disposal of the dredged material 
offshore of the beach was awarded on 19 June 1987 
and completed on 27 August 1987. Removed 449,005 
cubic yards of material. Operations and 
maintenance funds in the amount of $1,342,412 was 
expended on engineering and design, supervision 
and inspection, and contract work for this project 
during FY 1987. 
Condition as of September 30. Work under 
existing project was commenced August 1953 and 
completed June 1959. JONES INLET - JETTY 
REHABILITATION ($34,500). The purpose of this 
study is to develop a feasible and cost effective 
design for rehabilitation of the Jones Inlet Jetty to 
insure structural stability and maximize the sand 
trapping efficiency of the structure. Inlet 
hydrographic and existing jetty condition surveys 
have been performed. Preliminary design and cost 
estimates for alternative schemes have been 
developed and the superior scheme recommended. 
JONES INLET - MAINTENANCE 
MODIFICATIONS ($49,264). The purpose of this 
study is to develop feasible and cost efficient 
alternative which would minimize channel 
maintenance requirements. Existing tidal/inlet 
hydraulics, inlet/bay stability, jetty impoundment 
rates, etc., have been evaluated. Several methods of 
shoaling analysis were reviewed and the most 
applicable used. Preliminary design layouts and 
cost estimates for a deposition basin and navigation 
channel have been developed and the superior 
scheme recommended. 
10. KILL VAN KULL - NEWARK BAY 
CHANNEL, N.J. & N.Y. 
Location. The project includes Kill Van Kull 
connecting upper New York Bay with Newark Bay, 
and channels in lower Newark Bay serving Port 
Newark and Elizabeth Marine Terminal. These 
terminals are located on the west shore of Newark 
Bay. (See National Ocean Survey Chart 12333.) 
Existing project. Deepening the existing Kill Van 
Kull channel and channels in lower Newark Bay, 
including turning and maneuvering areas. The 
deepening to be done from the existing 35 foot depth 
incrementally to 40 feet and then 44 feet. The 
Federal cost of construction is estimated at 
$195,000,000 with an additional $147,000,000 to be 
contributed by local interests (Oct 87 P.L.). 
Local cooperation. The Port Authority of New 
York and New Jersey, the local cooperating agency, 
has entered into a local cooperation agreement with 
the Government which was executed on 30 May 1986. 
A supplemental agreement was executed on 21 May 
1987. 
Terminal facilities. See Port Series No. 5, Vol. 2. 
Operations and results during period, and 
condition as of Sept. 30. Contract No. 1 is proceeding 
successfully. Plans and Specs for FY 88 contracts 
are being developed. 
11. LAKE MONTAUK HARBOR, N.Y. 
Location. On east end of Long Island, about 3 
miles by land west of Montauk Point and 125 miles 
by water east of New York City. It is land-locked on 
the east, south and west sides and is connected to the 
north with Block Island Sound by an artificial inlet. 
(See National Ocean Survey Chart 13209) 
Existing project. A channel 12 feet deep and 150 
feet wide extending from 12-foot contour in Block 
Island Sound to same depth in existing yacht basin 
east of Star Island; a boat basin 10 feet deep, 400 feet 
wide, and 900 feet long, northwest of Star Island; 
repair and extension shoreward of the east and west 
jetties; and addition of sport fishing facilities on top 
of both jetties. Section included in the project is 0.7 
miles long. Mean tidal range, 1.9 feet; mean range 
of spring tides, 2.2 feet; irregular fluctuations due to 
wind and atmospheric pressure vary from 2 feet 
below; mean low water up to 7 feet above mean high 
water. For latest published map see project 
document. (See Table 2-B for Authorizing 
Legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are fourteen marinas 
and mooring facilities for recreational boats. In 
addition, two terminals are used for commercial 
fishing vessels. None of the terminals have rail 
connections or are equipped with freight handling 
devices. Terminals are considered adequate for 
existing commerce. 
Operations and Results during fiscal year. A 
contract in the amount of $100,000 for the removal of 
5,361 cubic yards of material, except ledge rock, 
lying above the plane of 12 feet below mean low water 
with disposal of the dredged material on the beach 
was awarded on 2 September 1987 to Gibson and 
Cushman Dredging Corporation. Operations and 
maintenance funds in the amount of $124,806 was 
expended on engineering and design, supervision 
and inspection and contract work for this project 
during FY 1987. 
Condition as of September 30. Work under 
existing project was commenced August 1942 and 
was completed November 1968. Dredging entrance 
channel and shoreward extension of west jetty were 
performed from August 1942 to January 1943, at the 
request of the Navy Department with Navy funds. 
Extension of east jetty and repair of both jetties, 
provision of sport fishing facilities on both jetties 
and dredging the boat basin was completed 
November 1968. 
2-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
12. LONG ISLAND INTRACOASTAL 
WATERWAY, N.Y. 
Location. Extends from East Rockaway Inlet, on 
the south side of Long Island, to Great Peconic Bay at 
eastern end of Long Island. Section included under 
this project extends from Great South Bay opposite 
Patchogue to the south end of Shinnecock Canal. 
(See National Ocean Survey Chart 12352.) 
Existing project. A channel 100 feet wide and 6 feet 
deep at mean low water from the federally improved 
channel in Great South Bay, opposite Patchogue to 
south end of Shinnecock Canal. Section included in 
project is 34 miles long. Mean tidal range varies 
from 1 foot in Shinnecock Bay to 0.7 foot in 
Patchogue Bay; mean range of spring tides varies 
from 1.2 feet to 0.8 foot; irregular fluctuations due to 
wind and atmospheric pressure vary from 1.8 feet 
below mean low water to 12 feet above mean high 
water. (See Table 2-B for Authorizing Legislation.) 
Local cooperation. Complied with except local 
interests must furnish suitable spoil-disposal areas 
for future maintenance as required. 
Terminal facilities. There are 17 boat repair and 
storage yards within the area immediately adjacent 
to the Federal improvement. There is ample room 
for expansion and development of terminals when 
future commerce warrants. 
Operations and results during period. A 
continuing contract in the amount of $1,880,930.50 
for the removal of approximately 158,475 cubic yards 
of material, except ledge rock lying above the plane 
of 6 and 10 feet below mean low water in specified 
sections within the Bellport Bay reach, Narrow Bay 
reach, Moriches Bay reach and Quantuck Bay reach, 
of Long Island Intracoastal Waterway, New York, 
with disposal of the dredged material on nearby 
beaches and on confined upland area was awarded 
on 2 September, 1987 to Gibson and Cushman 
Dredging Corporation. Operations and maintenance 
funds in the amount of $769,107 was expended 
on engineering and design, supervision and 
inspection, and contract work for this project during 
FY 1987. 
Condition as of September 30. Original work 
under the existing project was commenced Oct 1939 
and completed Sept 1940. 
13. MORICHES INLET, N.Y. 
Location. On the south shore of Long Island, about 
80 miles by water east of the Battery, New York City. 
It is an opening through the narrow sandy barrier 
beach on the south shore of Long Island which 
separates the Atlantic Ocean from a series of 
interconnected bays. (See National Ocean Survey 
Chart 12352.) 
Existing project. Provides for a channel, 10 feet 
deep at mean low water and 200 feet wide extending 
from that depth in the Atlantic Ocean to Moriches 
Bay, a distance of 0.7 mile; thence a channel 6 feet 
deep and 100 feet wide to the Long Island Intracoastal 
Waterway, a distance of 1.1 miles; rehabilitation of 
the existing jetties and revetments. Estimate of cost 
of work is $13,050,000 (October 1987 P.L.) including 
$50,000 from Coast Guard and $4,550,000 to be 
contributed by local interests. (See Table 2-B for 
Authorizing Legislation.) 
Local cooperation. In accordance with the project 
authorization, local interests are required to furnish 
all easements, rights-of-way including relocations 
that are necessary for improvements at an overall 
35% cost sharing basis. The annual Operations and 
Maintenance cost is estimated to be $1,860,000, of 
which the local share is 50% or $930,000 per year. An 
Agreement of Local Cooperation was executed on 30 
June 1986. The New York State Department of 
Environmental Conservation is the local sponsor. 
Terminal facilities. No terminals are within the 
area immediately adjacent to the Federal 
improvement. However, numerous public and 
private terminals facilities are available in 
Moriches Bay and in the connecting canals. 
Several yacht clubs, boatyards, and public wharfs 
and landings,, and numerous private landings are 
located in Moriches Bay. The yacht clubs and 
boatyards have equipment for servicing boats. 
There are boat basins open to the public. The 
facilities existing in the bay are considered 
adequate for present and probable future needs under 
present conditions of Moriches Inlet. There is room 
for expansion should future commerce warrant. 
Operations and results during period. Preconstruction 
planning resumed in October 1977. 
Coordination continued with Federal, State and 
local agencies on current problems and need for all 
project purposes (i.e. navigation; beach erosion 
control; water quality improvement). A post 
authorization change was approved in September 
1983 to allow construction of each project purpose 
separately which clarified authority to defer all 
purposes except navigation. In January 1980, a 
breach occurred adjacent to the eastern jetty. 
Emergency funds ($11.3 million) were authorized 
under the authority of PL84-99 to close the breach. 
About 1,185,000 yards of sand fill were used to effect 
closure of the breach by March 1981. 
Condition as of September 30. Construction has not 
been initiated. Preconstruction planning (advance 
engineering and design) has been completed and 
contract plans and specifications were completed in 
January 1985. 
14. NARROWS OF LAKE 
CHAMPLAIN, N.Y. & V.T. 
Location. This waterway, 37 miles long, 
comprises southern end of Lake Champlain and 
extends from Whitehall to Crown Point, N.Y. at 
2-8

NEW YORK, N.Y. DISTRICT 
southern extremity of lake, northerly to Benson 
Landing, Vt. (See N. O. S. Chart 14784.) 
Previous projects. For details, see Annual Reports 
for 1931, and 1963, pages 256 and 177, respectively. 
Existing project. A channel extending from 
Whitehall, N.Y., at head of Lake Champlain, to 
Benson Landing, 12 feet deep at low lake level and 
generally 150 feet wide, and installation of fender 
booms at Putts Rock, Putts Leap, Narrows near 
Dresden, Pulpit Point and Cedar Mountain. 
Reference plane of low lake level is 93 feet above 
mean sea level. Section included in project is about 
13.5 miles. Usual annual variation of lake level is 
5.8 feet and extreme variation varies from 0.6 foot 
below up to 8.8 feet above low lake level. 
Widening channel throughout its entire length to 
project width of 20 feet is inactive and excluded from 
foregoing description of existing project and cost 
estimate. (See Table 2-B for Authorizing 
Legislation.) 
Local cooperation. None required. 
Terminal facilities. In Whitehall Harbor 
consisting of three timber wharves, aggregating 
4,200 feet in length. State of New York constructed a 
barge canal terminal at Whitehall, just south of 
terminus of canal, which has been equipped with a 5- 
ton hand-operated derrick and a storehouse. 
Facilities are considered adequate for present 
commerce. 
Operations and results during period. 
Government plant and hired labor were employed 
intermittently during the fiscal year in removal of 
stumps and snags that posed a potential hazard to 
navigation at a cost of $14,139. Government plant 
and hired labor were employed in replacing 
deteriorated fender booms at a cost of $6,102. 
Operations and maintenance funds in the amount of 
$10,139 were expended on engineering and design 
for future maintenance of this project. 
Condition as of September 30. Work under the 
existing project was commenced June 1919 and is 
about 77 percent complete. A channel 12 feet deep at 
low lake level and least a width of 150 feet has been 
excavated throughout the length of the improvement, 
except at the Elbow, where the width is 110 feet. 
Fender booms have been placed at the elbow. (Putts 
Leap and Putts Rock). 
15. NEWARK BAY, HACKENSACK 
AND PASSAIC RWERS, N.J. 
Location. Newark Bay is an estuary about 1.25 
miles wide and 6 miles long extending southerly 
from confluence of Hackensack and Passaic Rivers 
to New York and New Jersey Channels. 
Hackensack River rises near Haverstraw, 
Rockland County, N.Y. and flows about 45 miles 
into Newark Bay. Passaic River rises in highlands 
of northeastern New Jersey and flows about 80 miles 
into Newark Bay. (See National Ocean Survey 
Charts 12333 and 12337.) 
Previous projects. For details see 1926 Annual 
Report, pages 265 and 266; and Annual Reports for 
1929,1938,1954, and 1976, pages 301,244,134, and 2-11 
respectively. 
Existing project. A main channel 700 feet wide to 
the branch channel to Port Newark, thence 500 feet 
wide to a turning basin 1,300 feet long and 900 feet 
wide at the junction of the Hackensack and Passaic 
River channels, length about 4.7 miles; a 
maneuvering area south of the former Central 
Railroad of New Jersey Bridge 2,200 feet long and 
300 feet wide with depths of 38 feet in the south half 
and 35 feet in the north half; a combined bend cutoff 
and maneuvering area at the south side of the 
junction with Elizabeth branch channel; and 
widening of bends at the Kill Van Kull and Port 
Newark Channels. (Authorized depth 35 feet except 
as noted above.) (adopted 1966.) 
At Port Newark - A branch channel 800 feet wide 
leading to an inshore channel 400 feet wide 1.6 miles 
(adopted 1945). Authorized depth 37 feet in rock and 
35 feet in soft material; a pierhead channel 200 feet 
wide along the east bulkhead between the Port 
Newark and Elizabeth branch channels, length 
4,100 feet. Authorized depth 35 feet (adopted 1962). 
At Elizabeth Marine Terminal - A branch 
channel 500 feet wide, length about 1.4 miles; a 
pierhead channel along the east bulkhead 290 feet 
wide, length about 1.1 miles; a south channel along 
the south bulkhead 290 feet wide, length about 2,600 
feet; a southern approach area just above former 
Central Railroad of New Jersey Bridge enlarged for 
turning and maneuvering, with a maximum length 
of about 2,700 feet and width (between the pierhead 
channel and Newark Bay channel) of about 800 feet. 
Authorized depth 35 feet (adopted 1962). 
Local cooperation. River and Harbor Act of 1954 
provides local interests furnish lands, rights-ofway, 
and suitable spoil-disposal areas for initial 
construction and future maintenance; provide 
depths commensurate with channel depth in 
approaches and berths at terminals of companies 
which would use improvement; and hold the United 
States free from damages. River and Harbor Act of 
1962 provides that local interests must provide lands, 
easements and rights-of-way for maintenance and 
construction, hold United States free from damages, 
provide and maintain adequate public terminal and 
transfer facilities, and accomplish without cost to the 
United States, removal or relocation of pipelines, 
cable and other utilities. Assurances were furnished 
by Port of New York Authority and accepted June 12, 
1964. Local cooperation required by previous 
modifications is fully compiled with. 
2-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Terminal facilities. See Port Series No. 5, revised 
1978, Vol. 2. 
Operations and results during period. A 
continuing contract in the amount of $1,180,300 for 
the removal of approximately 300,000 cubic yards of 
material above the plane of 35 feet below mean low 
water in specified areas of Port Newark Bay 
Channel, and Main Channel of this project with 
disposal of the dredged material at the EPA approved 
Mud Dump site in the Atlantic Ocean was awarded 
on 7 August 1987 to Weeks Marine, Inc. Operations 
and maintenance funds in the amount of $799,434 
was expended on engineering and design, 
supervision and inspection and contract work for 
this project during FY 1987. 
Condition as of September 30. Work under the 
active portion of project began June 1976 and is 100 
percent complete. Work remaining to complete 
existing project consists of; deepening the 
Hackensack River channel to depths of 32 feet and 15 
feet. 
Work was initiated for modification of project 
consisting of additional widening at junction with 
Kill Van Kull by deepening to 37 feet a triangular 
area at the eastern end of the 30 foot channel south of 
Shooters Island. Two contracts for the removal of all 
material including ledge rock to 37 feet mean low 
water were completed at a total cost of $4,402,631. 
16. NEW YORK AND NEW JERSEY 
CHANNELS 
Location. Extends from deep water northwest of 
Sandy Hook, through Lower New York bay and 
Raritan bay, to Perth Amboy, and thence through 
Arthur Kill, lower Newark Bay, and Kill Van Kull 
to deep water in Upper New York Bay. This route is 
approximately along boundary line between states of 
New York and New Jersey. (See National Ocean 
Survey Charts 12333,12331, and 12327.) 
Previous projects. For details see 1963 Annual 
Report pages 184 and 185. 
Existing project. A channel through Lower New 
York Bay, Raritan Bay, Arthur Kill, lower Newark 
Bay, and Kill Van Kull to Upper New York Bay and 
Raritan Bay and in Arthur Kill to a point 1,000 feet 
north of Smith Creek, widened to 800 feet in vicinity 
of Seguine Point and Wards Point, respectively; 
thence 500 wide to a point 1,000 feet south of Piles 
Creek; thence 500 to 600 feet wide and passing north 
of Shooters Island and protected by a dike on its 
northern side to junction of channel into Newark 
Bay; thence 800 feet wide through Kill Van Kull to 
Constable Hook; thence 1,000 feet wide from a point 
opposite the east end of Constable Hook to a point near 
the intersection with the, channel along New Jersey 
pierhead line; and thende 1,400 feet wide through 
Kill Van Kull to Upper New York Bay; with an 
anchorage 38 feet deep to accommodate five vessels 
south of Perth Amboy, all with suitable easing at 
bends and junctions. Section included in project is 
30.8 miles long. In addition, construction of a dike 
north of Shooters Island and two secondary channels 
30 feet deep and 400 feet wide, one south of Shooters 
Island and the other in Raritan Bay connecting with 
Raritan River, were completed under previous 
projects and maintained under existing project. A 
triangular area at the eastern end of the 30 foot 
channel south of Shooters Island was deepened to 35 
feet in order to provide additional widening in the 
vicinity of Bergen Point and is included in the 
Newark Bay project. All depths refer to plane of 
mean low water. Mean range of tides varies 
between 4.7 and 5.1 feet; mean range of spring tides, 
5.7 to 6.3 feet; irregular fluctuations due to wind and 
atmospheric pressure vary from 3.9 feet below mean 
low water up to 6.9 feet above mean high water. 
Anchorage at Sandy Hook, and cutoff at junction of 
Main Ship Channel are deferred for restudy and 
excluded from foregoing description and cost 
estimate. (See Table 2-B for Authorizing 
Legislation.) 
Local cooperation. Fully complied with except for 
the middle section of Arthur Kill where local interest 
must furnish spoil disposal areas for maintenance. 
Terminal facilities. See Port Series No. 5, revised 
1978, Vol. 2. 
Operations and results during period. A contract 
in the amount of $510,136 was awarded on 7 May 1987 
to Weeks Marine, Inc. for the removal of 
approximately 136,400 cubic yards of material, 
except ledge rock, lying above the planes of 35 feet 
below mean low water, in specified areas of channel 
North of Shooters Island with disposal of the dredged 
material at EPA approval Mud Dump site in the 
Atlantic Ocean. A total of 202,234 cubic yards of 
material was removed, of which 48,003 cubic yards 
was excess side slopes and over-depth. The work 
commenced on 12 May 1987 and completed on 6 June 
1987. Operations and maintenance funds in the 
amount of $792,986 was expended on engineering 
and design, supervision and administration and 
contract work for this project. 
Conditions as of September 30. Work under active 
portion of existing project began in October 1933. 
Work completed consists of providing authorized 
project depth and widths throughout entire channel 
from Lower New York Bay to Upper New York Bay 
and providing depths of 37 and 25 feet in Perth 
Amboy Anchorage. In addition to above mentioned 
work, construction of dike north of Shooters Island, 
two secondary channels 30 feet deep and 400 feet 
wide, one south of Shooters Island, the other in 
Raritan Bay connecting with Raritan River were 
completed under previous projects. Work 
remaining under existing project consists of 
dredging cutoff at junction of Main Ship Channel to 
2-10

NEW YORK, N.Y. DISTRICT 
dimensions authorized by River and Harbor Acts of 
August 30, 1935, and May 17, 1950, dredging 
anchorage in vicinity of Sand Hook. (See Table 2-D 
for total cost for existing project to September 30, 
1987.) 
17. NEW YORK HARBOR - 
COLLECTION AND REMOVAL 
OF DRIFT 
Location. Applies to Lower and Upper Bays, New 
York Harbor; East River, Harlem River, Hudson 
River Channel, N.Y., New York and New Jersey 
Channels, Newark Bay, N.J. and their tributaries. 
Existing project. Provides for collection, removal 
and disposal of drift, derelict vessels, deteriorated 
shore structures and debris along shores of New 
York Harbor and tributary waters, and for the repair 
of certain other piers, wharves and shore structures. 
Work authorized before Act of 1970 was restricted 
solely to removal of drift from waterways and was 
funded as a maintenance activity. Estimate of first 
cost under the 1987 Supplemental Appropriations Act 
is $134,600,000 (October 87 P.L.) including 
$25,930,000 cash contribution from local interests 
plus $56,770,000 to be contributed for repair and 
disposal of deteriorated shore structures in use. (See 
Table 2-B for Authorizing Legislation.) 
Local cooperation. Local cooperation conditions of 
the plans currently under review by the Chief of 
Engineers provide that local interests must furnish 
all lands, easements- and rights-of-way required for 
the improvement; hold the United States free from 
damages; enact and enforce local legislation to 
prevent creation of sources of drift, contribute in 
cash one third of the first cost of the Federal work, 
and make necessary repairs to deteriorated 
structures in use so as to eliminate them as a source 
of drift. These conditions are subject to approval by 
the Secretary of the Army and the President, as 
stipulated in Section 113 of the authorizing law, 
Public Law 91-611. 
Operations and results during period. New work: 
A total of five Liberty State Park Contracts were 
completed at a cost of $4,649,000. East River- 
Manhattan Waterfront contract was completed at a 
cost of $1,478,000. A contract for the removal of Piers 
17 and 18 on the East River was completed at a cost of 
$220,000. The City of Elizabeth contract was 
completed at a cost of $792,000. The Stapleton, Staten 
Island contract was completed at a cost of $2,910,000. 
A contract for the City of Hoboken was completed at a 
cost of $2,160,100. Work along the Jersey City South 
waterfront was completed at a cost of $956,000. 
Contract Number One at Weehawken to Edgewater 
was completed at a cost of $1,599,000. A continuing 
contract was awarded for Brooklyn Reach One at an 
estimated cost of $4,165,000. Weehawken to 
Edgewater contract No. 2 was awarded at an 
estimated cost of $5,449,000. Hoboken Pier B contract 
was awarded at an estimated cost of $632,000. The 
Bayonne (mainland) contract was awarded for the 
base bid only in the amount of $221,000. 
Engineering and design is in progress for Brooklyn 
Reach 2 and the Arthur Kill reach in New York. In 
the State of New Jersey Arthur Kill Reach and Jersey 
City North Reach are being investigated. 
Maintenance. U.S. Debris Boats Driftmaster, 
Gelberman and Hayward and auxiliary plant were 
assigned the task of removing and disposing of 
floating debris that is a hazard to navigation. 
Removal and disposal of 645,942 cubic feet (5,046 
cords) of floating debris consisting mainly of 
driftwood, ranging in size from small blocks to 
large timbers, including pilings, pieces of 
wreckage, derelict vessels and sections of 
deteriorated pier structure was accomplished at a 
cost of $2,988,000 in FY 1987. 
Conditions as of September 30. For work 
authorized by the 1974 Water Resources Development 
Act, removal of drift sources has been completed in 
New Jersey at Liberty State Park, the City of 
Elizabeth, Hoboken, and parts of Jersey City, 
Weehawken, and Edgewater. In New York City, 
work has been completed along the Manhattan side 
of the East River inclusive of Piers 17 and 18, 
Stapleton, Staten Island. Removal work is currently 
underway at Brooklyn. 
18. NEW YORK HARBOR - 
ENTRANCE CHANNELS AND 
ANCHORAGE AREAS 
Location. In Upper and Lower bays, New York 
Harbor is 330 miles southwest by water of Boston 
Harbor, Mass., and 165 miles northwest of entrance 
to Delaware Bay, N.J. The Upper Bay extends about 
5.5 miles southerly from junction of Hudson and 
East Rivers opposite the Battery, New York City to the 
Narrows. Lower Bay extends about 9 miles from the 
Narrows to the sea. (See National Ocean Survey 
Charts 12327,12334,12335, and 12349). 
Existing project. Ambrose Channel 45 feet deep 
and 2,000 feet wide, extending about 10.2 miles from 
sea to deep water in the Lower bay; Anchorage 
Channel, an extension of Ambrose Channel, with 
same depth and width, in the Upper bay, opposite 
anchorage grounds, about 5.7 miles long; a 
southerly entrance channel, Sandy Hook Channel 
(East Section) 35 feet deep and generally 800 feet 
wide extending 3.4 miles from 35-foot ocean contour 
to Bayside Channel along an alignment generally 
west of the South Channel; and elimination from 
authorized project of that portion of Bayside-Gedney 
Channel east of junction with new southerly 
entrance channel; for Bayside Channel 35 feet deep 
and 800 feet wide, extending about 3.7 miles from 
junction with new southerly entrance to junction 
2-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
with Main Ship Channel; Main Ship Channel 30 feet 
deep and 1,000 feet wide, extending about 5.3 miles 
from Bayside Channel to deep water in Lower bay; a 
channel along New Jersey pierhead line connecting 
Kill Van Kull with deep water in Anchorage 
Channel, south of Liberty Island anchorage, 20 feet 
deep for 500 feet wide with widening at bends to 800 
feet and about 3 miles long; an anchorage in 
vicinity of Liberty (Bedloes) Island (about 160 acres 
in extent) 20 feet deep; and for removal of Craven 
Shoal to 30 feet deep; for a channel 16 feet deep, 200 
feet wide, and about 2.3 miles long, extending from 
bell buoy 23 to Hoffman and Swinburne Island; for 
an anchorage area in Red Hooks Flats to depths of 
45, 40 and 35 feet and an anchorage area in 
Gravesend Bay to 47 feet deep. Project depths refer to 
mean low water. Mean tidal range is 4.7 feet at Fort 
Hamilton; mean range of spring tides, 5.7 feet; 
irregular fluctuations due to wind and atmospheric 
pressure vary from 3.9 feet below mean low water up 
to 6.2 feet above mean high water. 
Local cooperation. Fully complied with. 
Terminal facilities. See Port Series No. 5, revised 
Vol. 2. 
Operations and results during period. The U.S. 
Army Corps of Engineers dredge "McFarland" was 
employed from September 1987 to October 1987 to 
restore project dimensions in Sandy Hook Channel. 
Removed 285,250 cubic yards, place measurement, of 
material at a cost of $1,080,000. 
Condition as of September 30. Work under 
existing project began in 1885 and is 100 percent 
complete. Main Ship and Bayside-Gedney 
Channels were completed to 30 feet deep in February 
1891. Deepening of Bayside-Gedney Channel to 35 
feet for a width of 800 feet was completed in June 
1939. Ambrose Channel was completed to 40 feet deep 
for a width of 2,000 feet in April 1914 and 
substantially completed to 45 feet deep for a width of 
2,000 feet in 1951. Relocation of Anchorage Channel 
was completed to 40 feet deep in October 1932. Center 
800 feet was dredged to 45 feet in June 1947 and 
westerly 600-foot strip in April 1948. Easterly 600- 
foot strip was substantially completed in June 1953. 
Channel between Staten Island and Hoffman and 
Swinburne Islands was completed in December 1920 
up to within 300 feet of southerly limits of the project. 
Dredged channel meets all needs of navigation and 
no further work of improvement is contemplated for 
the present. Channel along New Jersey pierhead 
line from Kill Van Kull to Anchorage Channel was 
completed in March 1939. Widening at bends near 
southerly and northerly ends authorized in 1948 was 
completed to depths of 45, 50, and 35 feet in October 
1976. Anchorage Channel was relocated to the 
westward in 1982. Red Hook Flats Anchorage was 
accordingly increased in area. No dredging was 
required. Liberty (Bedloes) Island anchorage was 
completed to 20 feet in October 1944. Sandy Hook 
Channel (east section) was completed to a depth of 35 
feet in June 1963. Gravesend Bay Anchorage was 
completed to a 47-foot depth in November 1977. 
19. RARITAN RIVER, N.J. 
Location. Rises in north-central part of New 
Jersey and flows generally southeasterly into 
Raritan Basin, between Perth Amboy and South 
Amboy, about 24 miles by water south of the Battery, 
New York City. (See National Ocean Survey Chart 
12332.) 
Previous projects. For Details see Annual Reports 
for 1915, 1918, and 1938, pages 1777, 359, and 259 
respectively. 
Existing projects. A channel 25 feet deep and 300 
feet wide extending 5.8 miles from turn in New 
York and New Jersey Channels near Great Beds 
Light to Government wharf on Main Channel, 
widened to 600 feet for 1,000 feet long opposite wharf to 
form a turning basin of same depth; thence a 
channel 15 feet deep and 200 feet wide 3 miles to 
Washington Canal; thence 10 feet deep in soft 
material, 11 feet deep in rock, and generally 100 feet 
wide with widening at bends 5 miles to Delaware 
and Raritan Canal entrance at New Brunswick, 
and a South Channel 25 feet deep and 300 feet wide 0.8 
mile from junction with Main Channel at Keasby to 
upper limit of Titanium Pigment Co. property; 
thence 15 feet deep and 150 feet wide 0.4 mile to dock 
of Middlesex County Sewerage Authority; thence 10 
feet deep and 150 feet wide 2 miles to a point 1,300 feet 
below upper junction with Main Channel at Crab 
Island. Plane of reference is mean low water. 
Mean range of tides is 5.1 feet at mouth of river and 
5.6 feet at New Brunswick; mean range of spring 
tides, 6.1 and 6.6 feet respectively. Irregular 
fluctuations due to winds and atmospheric pressure 
vary from 3.6 feet below mean low water up to 6.9 feet 
above mean high water. New work for completed 
portion of project, consisting of channels described 
above cost $1,237,000, exclusive of amounts expended 
on previous projects and including $66,000 
contributed by local interests. Dredging South 
Channel to 10 feet deep and 150 feet wide for 1,300 feet 
to upper junction with Main Channel at Crab Island 
is inactive and excluded from foregoing description 
and cost estimate. (See Table 2-B for Authorizing 
Legislation.) 
Local cooperation. Complied with except local 
interests must furnish spoil-disposal areas for 
maintenance to 25-foot channel from New York & 
Long Branch Railroad bridge to junction of Main 
and South Channels, and in South Channel to 
Titanium Pigment Co. property. River and Harbor 
Act of 1962, provides local interests furnish spoildisposal 
areas and necessary retaining dikes, 
bulkheads and embankments therefore, required for 
2-12

NEW YORK, N.Y. DISTRICT 
maintenance of improvement, and hold the United 
States free from damages. 
Terminal facilities. See Port Series No.5, revised 
1965, Vol. 2, Part 2, pages 274-279 and 281. 
Operations and results during period. A contract 
in the amount of $2,105,400 for the removal of 
approximately 660,000 cubic yards of material, 
except ledge rock lying above the plane of 25 feet 
below mean low water with disposal of the dredged 
material at EPA approved Mud Dump site in the 
Atlantic Ocean was awarded on 22 April 1987 to 
Atlantic Trailing Company. A total of 721,983 cubic 
yards of material was removed, of which 119,976 
cubic yards was excess overdepth and side slopes. 
The work commenced on 14 July 1987 and completed 
on 27 September 1987. Operations and maintenance 
funds in the amount of $2,345,369 was expended on 
engineering and design, supervision and 
inspection, and contract work for this project during 
FY 1987. 
Conditions as of September 30. Entire existing 
project is about 96 percent complete. Work under 
active portion of existing project was commenced 
September 1919 and completed July 1941. A shoal 
along northerly channel line in vicinity of Victory 
Bridge was eliminated by relocation of channel in 
February 1959. Main Channel dredged 25 feet deep 
and 300 feet wide from junction with New York and 
New Jersey Channels to and including a turning 
basin of same depth opposite Government wharf, 
thence 15 feet deep and 200 feet wide to mouth of 
Washington Canal, thence 10 and 11 feet deep and 
100 feet wide to Delaware and Raritan Canal outlet 
locks at New Brunswick. South Channel dredged 25 
feet deep and 300 feet wide for 3,200 feet, thence 10 feet 
deep and 150 feet wide for 12,400 feet to within 1,300 
feet of junction with Main Channel to Crab Island. 
Model study of Raritan River was completed in 
March 1952. Work remaining under existing 
project is dredging South Channel to 10 feet deep and 
150 feet wide for 1,300 feet to upper junction with 
Main Channel at Crab Island. 
20. RONDOUT HARBOR, N.Y. 
Location. Comprises tidal mouth about 3.5 miles 
long, of Rondout Creek, whose source is about 18 
miles west of Rondout. Creek empties into Hudson 
River from the west, about 89 miles north of the 
Battery, New York City, and 55 miles south of 
Albany. 
Existing project. A channel 100 feet wide, 
widening at bends, and 14 feet deep from deep water 
in Hudson River to highway bridge, 1.3 miles above 
mouth, thence 12 feet deep to 3.5 miles above mouth, 
two parallel dikes 350 feet apart to maintain 
channel, and a branch dike to extend upstream from 
outer end of north dike to protect that dike from 
running ice in Hudson River. Mean tidal range, 
3.7 feet; mean range of spring tides, 4.2 feet; extreme 
range, 8.2 feet; irregular fluctuations due to freshets 
vary from 2 feet below mean low water up to 2.5 feet 
above mean high water. New work for completed 
project cost $131,140. (See Table 2-B for Authorizing 
Legislation.) 
Local cooperation. River and Harbor Act of 1965 
provides local interests furnish lands, easements, 
and rights-of-way for construction and future 
maintenance of the Federal project as modified and 
for construction and maintenance of aids to 
navigation upon request of the Chief of Engineers, 
including suitable spoil-disposal areas and 
necessary retaining dikes, bulkheads and 
embankments therefore or the costs of such 
retaining works; hold the United States free from 
damages, and provide and maintain depths in 
berthing areas serving terminals commensurate 
with depths provided in related project areas. 
Assurances of local compliance were furnished by 
town of Ulster on June 9, by city of Kingston on June 
17, and by town of Esopus on June 20,1966. 
Terminal facilities. Seventeen timber wharves 
with available dockage of 12,132 feet along 
waterway. Four terminals are equipped with 
transfer facilities; all are privately owned. 
Terminals adequate for present needs of commerce. 
(For latest full description see Port and Terminal 
Facilities at the Ports on Upper Hudson River, 1941, 
Corps of Engineers.) 
Operations and results during fiscal year. 
Operations and maintenance funds in the amount of 
$70,814.00 was expended on surveys and 
engineering and design for rehabilitation of dikes 
at Rondout Harbor, N.Y. 
Condition at end of fiscal year. Work under 
existing project was commenced April 1873 and is 
about 87 percent complete. Part of diking originally 
proposed was not built because it was deemed of 
doubtful usefulness. Two parallel dikes of an 
aggregate length of about 5,000 feet, generally 350 
feet apart, with a now obsolete spur from the old 
lighthouse south of south dike, were built across the 
bar at mouth of creek. A branch dike about 1,000 feet 
long, extending northerly from outer end of north 
dike, was also constructed. Work remaining 
consists of removal of shoals in the 12 and 14 foot 
projects and rehabilitation of deteriorated sections of 
the parallel and branch dikes. 
2L SHARK RIVER 
Location. A small stream entering Atlantic 
Ocean 20 miles south of Sandy Hook on the New 
Jersey coast. Forty miles by water south of the 
Battery, New York City. (See National Ocean 
Survey Chart 12326.) 
Existing project. A 1.7 mile channel 18 feet deep at 
mean low water and 150 feet wide across the bar at 
2-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
entrance to inlet; thence 12 feet deep and generally 
100 feet wide through main channel and south 
channel to Route 35 bridge; thence 8 feet deep and 100 
feet wide to upper limit of the Belmar municipal boat 
basin, with additional depths and widths where 
necessary and practicable to produce satisfactory 
current velocities at bridges: and an anchorage 12 
feet deep over about 7.3 acres east of Route 4-N 
bridge. Mean tidal range at mouth is 4 feet; mean 
range of spring tides 4.8 feet; irregular fluctuations 
due to wind and atmospheric pressure vary from 2.6 
feet below mean low water up to 8.4 feet above mean 
high water. New work for completed project cost was 
$150,000. (See Table 2-B for Authorizing 
Legislation.) 
Local cooperation. Fully complied with except that 
local interests are required to furnish suitable spoildisposal 
areas for maintenance. 
Terminal facilities. Two yacht basins are located 
on south shore of lower portion of Shark River. One 
is publicly owned and has a berthage of 2,600 feet. 
Several boatyards, boathouses, and landings for 
commercial and recreational craft are located in the 
lower portion of Shark River. 
o 
Operations and results during fiscal year. A 
continuing contract for maintenance dredging of 
channel to restore projects depth was awarded in FY 
1981. Work was completed February 24, 1982. 
Expended $29,985 in Fiscal Year 1984 for 
Modification of Contract for survey costs. 
Operations and maintenance funds in the amount of 
$24,041 was expended on reconnaissance surveys for 
this project during Fiscal Year 1987. 
Condition at end of fiscal year. Work under the 
existing project was commenced June 1947 and was 
completed October 1947. 
22. SHINNECOCK INLET, N.Y. 
Location. On the south shore of Long Island, about 
95 miles east of the Battery, New York City. It is an 
opening through the sandy barrier beach, connecting 
Shinnecock Bay with the Atlantic Ocean. (See 
National Ocean Survey Chart 12352.) 
Existing project. Provides for a channel 10 feet 
deep (mlw) and 200 feet wide extending through the 
inlet to Shinnecock Bay for a distance of about 0.7 
mile; thence a channel 6 feet deep and 100 feet wide to 
the Long Island Intracoastal Waterway, a distance 
of about 1 mile; rehabilitation of the existing jetties 
and revetments. Estimate of cost for work is 
$12,100,000 (October 87 P.L.) of which the Federal 
share is $9,700,000 and non-Federal share is 
$2,700,000. 
Local cooperation. The navigation improvement 
will accrue both recreational and commercial 
benefits which result in a first cost allocation of 71 
percent Federal and 29 percent non-Federal. The 
authorizing document also requires that local 
authorities: provide without cost to the United States, 
all lands easements, rights-of-way, and suitable 
disposal areas for the initial work and for 
subsequent maintenance, when and as required; 
hold and save the United States free from damages 
due to the construction and maintenance of the 
project; maintain and operate the works after 
completion in accordance with regulations 
prescribed by the Secretary of the Army; provide and 
maintain suitable terminal facilities when and as 
required for the accommodation of vessels that 
would navigate the inlet and adjacent bays, open to 
all on equal terms; maintain, for the duration of the 
economic life of the project, continued public 
ownership of the publicly owned shores and their 
administration for public use, and continued 
availability for public use of the privately owned 
shores upon which a portion of the Federal share of 
the costs is based. The New York State Department 
of Environmental Conservation expressed their 
intent to provide required items of local cooperation 
by letter dated 8 September 1986. 
Terminal facilities. Shinnecock Bay, and 
adjacent ocean area, constitute an important marine 
fishery. The public fishing facility includes three 
docks, one of which, the Shinnecock Fishermens 
Cooperative, stores and market the catch for the 
fishermen. 
Operations and results during period. Work was 
completed on a draft General Design Memorandum. 
Condition as of September 30. No Federal 
construction has been done. Preconstruction 
engineering and design is continuing. 
23. WESTCHESTER CREEK, N.Y. 
Location. A tidal stream flowing into East River 
from north at a point 14 miles by water northeast of 
the Battery, New York City. (See National Ocean 
Survey Chart 12336.) 
Previous projects. For details see Annual Reports 
for 1921 and 1938, pages 238 and 164, respectively. 
Existing project. A 2.6 mile channel 12 feet deep at 
mean low water, 100 feet wide for 2,000 feet through 
the estuary; thence 80 feet wide for 3,000 feet; and 
thence 60 feet wide 8,800 feet to head of navigation at 
East Tremont Avenue (Fort Schuyler Road), with 
widening at bends, and two turning basins, one near 
upper end of channel, the other near Eastern 
Boulevard (Unionport) Bridge. Mean tidal range, 7 
feet; mean range of spring tides, 8.4 feet; irregular 
fluctuations due to wind and atmospheric pressure 
vary from 3.9 feet below mean low water up to 8.4 feet 
above mean high water. New work for completed 
active portion of the project cost $98,751 exclusive of 
amounts expended on previous projects. Dredging 
turning basin to a depth of 12 feet below mean low 
water, 250 by 1250 feet in extend, 500 feet downstream 
from head of navigation, is inactive and excluded 
2-14

NEW YORK, N.Y. DISTRICT 
from foregoing description and cost estimate. (See 
Table 2-B for Authorizing Legislation.) 
Local cooperation. River and Harbor Act of 1954 
provides that local interests agree to furnish lands, 
easements, and rights-of-way for construction and 
maintenance and furnish suitable spoil-disposal 
areas for initial work and future maintenance as 
required; hold the United States free from damages; 
and provide and maintain a suitable bulkhead or 
other works approved by Chief of Engineers for 
retaining the east bank of the turning basin 
alongside Hutchinson River Parkway; and that 
local interests give assurances they will construct a 
public wharf when required. Requirements under 
prior acts have been fully complied with. 
Terminal facilities. See Port Series No. 5, revised 
1978, Vol. 2. 
Operations and results during period. A lump 
sum contract in the amount of $719,217 for the 
removal of all material, except ledge rock, lying 
above the plane of 12 feet below mean low water with 
satisfactory disposal of dredged material at the 
EPA's approved Mud Dump Site in the Atlantic 
Ocean was awarded on 24 April 1986 to Weeks 
Dredging Company. The dredging work 
commenced on 22 July 1986 and was completed on 10 
October 1986. Operations and maintenance funds in 
the amount of $17,756 was expended for engineering 
and design, and supervision and administration 
during FY 1987 for this project. 
Conditions as of September 30. Work under the 
entire existing project is about 82 percent complete. 
Work under active portion of existing project 
commenced March 1932 and was relocated by city of 
New York in 1941. Head of navigation is at East 
Tremont Avenue, Bronx, about 2.6 miles above the 
mouth. Work remaining under existing project 
consists of dredging to 12 feet below mean low water 
a turning basin 250 by 250 feet in extent to be 500 feet 
downstream from head of navigation. 
24. SUPERVISOR OF NEW YORK 
HARBOR (PREVENTION OF 
OBSTRUCTION AND 
INJURIOUS DEPOSITS) 
The District Engineer, New York District, was 
designated Supervisor of New York Harbor under 
the provisions of the River and Harbor Act of June 29, 
1888 (33 U.S.C. 441-451), as amended July 12, 1952. 
Under this Act, the Supervisor of New York Harbor 
is charged with the mission of preventing the deposit 
of obstructive and injurious materials in New York 
Harbor and its adjacent and tributary waters, 
including Long Island Sound. The River and 
Harbor Act of August 18, 1894 (33 U.S.C. 452) makes 
it unlawful for any person or persons to engage in 
fishing or dredging for shellfish in any of the 
channels leading to and from New York Harbor, or 
to interfere in any way with the safe navigation of 
those channels by ocean steamships and ships of 
deep draft; the River and Harbor Act of March 3, 1899 
(33 U.S.C. 403, 307, 409) prohibits obstructions to 
navigable waters such as unauthorized structures, 
unauthorized fill, deposit of refuse, and willful or 
negligent abandonment of vessels. Other laws 
relating to the supervision of New York Harbor and 
its tributary waters are the Clean Water Act, the 
Marine Protection, Research and Sanctuaries Act of 
1972, the Coastal Zone Management Act of 1969, the 
Fish and Wildlife Act of 1956, the Federal Power Act 
of 1920, the National Historic Preservation Act of 
1966, the Endangered Species Act of 1973, the 
Deepwater Port Act of 1972, the Wild and Scenic 
Rivers Act, and the Land and Water Conservation 
Fund Act. 
Direct supervision of the waters under jurisdiction 
of the New York District was accomplished by 
means of a patrol vessel whose scope of duty includes 
surveillance of the waterfront for unauthorized 
construction or fill, surveillance of the 3-mile limit 
of tows enroute to dumping grounds in the Atlantic 
Ocean to ensure that material is not illegally 
deposited in the waters of New York Harbor, and 
investigation of wrecks and abandoned vessels. In 
addition to the patrol vessels, whose range of patrol 
was limited to New York Harbor, inspectors 
utilizing government vehicles equipped with twoway 
radios patrolled shorefront facilities and 
property. These inspectors operate out of field offices 
located at Melville, New York and one inspector 
working at the New York District Office. Their 
duties include inspection of authorized construction, 
fill or excavation in waterways, including wetland 
areas, to ensure that work is performed in 
accordance with the Corps permit. The inspectors 
also patrol all waterways in their respective areas 
and inform the public of the Corps role and 
jurisdiction as well as provide assistance in the 
preparation of permit applications. (See Table 2-E at 
end of chapter.) 
25. RECONNAISSANCE AND 
CONDITION SURVEYS 
(See Table 2-F at end of chapter.) 
26. OTHER AUTHIORIZED 
NAVIGATION PROJECTS 
(See Table 2-G at end of chapter.) 
2-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
27. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation Activities pursuant to Section 107, 
Public Law 645, 86th Congress as amended (Preauthorization). 
(See Table 2-N at end of chapter.) 
Beach Erosion Control 
28. EAST ROCKAWAY INLET TO 
ROCKAWAY INLET & 
JAMAICA BAY, N.Y. (PT.1) 
Location. Atlantic coast of New York City, 
between East Rockaway and Rockaway Inlets, and 
the lands within and surrounding Jamaica Bay. 
The coastal area (about 10 miles long) is a peninsula 
in Queens County separating the ocean and the bay. 
(See National Ocean Survey Charts 12327,12350, and 
12326.) 
Existing project. The project provides for 
approximately 8.7 million cubic yards of sand fill 
including the advanced placement of a two year 
supply of beach nourishment of the shore protection 
works for 10 years after completion of the initial 
beach fill. Federal participation (50 percent) 
includes first cost and periodic beach nourishment, 
the total estimated at $25,400,000 (Oct. 1986 P.L.) 
Local cooperation. Local interests must provide 
lands and rights-of-way, including borrow areas; 
bear 50 percent of total first cost presently estimated 
at $25,400,000 consisting of a cash contribution of 
$8,813,500 the final apportionment of cost to be made 
after actual costs and values have been determined 
and $16,586,500 for periodic nourishment, hold the 
United States free from damages; maintain, during 
economic life of project, continued public ownership 
and use of non-Federal publicly-owned shores upon 
which Federal participation in beach protection is 
based; maintain and operate all works after 
completion, control water pollution to the extent 
necessary to safeguard the health of bathers; local 
cooperation agreement was executed by the State May 
17, 1974 and approved for Secretary of Army May 21, 
1974. On May 22, 1974 sent to State an approved 
Escrow Agreement. 
Operations and results during period. Plans and 
Specs for periodic nourishment Contract No. 5 are 
underway. The contract is scheduled to be awarded 
in May 88. 
Condition as of September 30. Advance 
engineering and design is completed. Final 
Environmental Impact Statement on file with 
Council of Environmental Quality on April 16, 1971. 
Initial beach restoration completed in FY 1977. 
Contract for first increment of periodic nourishment 
was completed in August 1982. Contract for 
construction of stone groin at Beach 149th Street was 
completed in September 1982. Contract for third 
periodic nourishment contract No. 4. is completed. 
The fifth nourishment contract is scheduled for 
summer 1988. This is the final nourishment 
contract in which Federal participation is 
authorized. 
29. SANDY HOOK TO BARNEGAT 
INLET, N.J. 
Location. The northern portion of the Atlantic 
coast of New Jersey extending from Sandy Hook 
southerly to Barnegat Inlet, Length about 48 miles. 
Erosion has seriously reduced the width of most 
beaches in the study area with consequent exposure 
of the shore to storm damage. Because of this erosion 
of the shore the area does not provide sufficient 
recreational beaches for the proper accommodation 
of the present and prospective tributary population. 
SECTION I - SEA BRIGHT TO 
OCEAN TOWNSHIP, N.J. 
Location. That portion of the Atlantic coast of New 
Jersey in Monmouth County extending from Sea 
Bright southerly to Ocean Township - length about 
12 miles. Sea Bright is about 30 miles by water south 
of the Battery, New York City. 
Authorized project. Provides for Federal 
participation in the restoration and protection of the 
shore from Sea Bright to Ocean Township by 
artificial placement of sand to widen the beach to a 
minimum width of 100 feet at an elevation of 10 feet 
above mean low water and by the construction of 23 
new groins and the extension of 14 existing groins 
in the Sea Bright - Ocean Township section. The 
project provides for Federal participation in periodic 
nourishment costs for a period of 10 years from the 
year that the total quantity of fill placed has equalled 
that required to restore the beach to project 
dimensions in that section. Total estimated Federal 
cost is $91,000,000. Total estimated non-Federal for 
all requirements of local cooperation is $12,000,000. 
(See Table 2-B for Authorizing Legislation.) 
Local cooperation. Reconstruction of the sea wall 
at Sea Bright and Monmouth was funded by the State. 
In addition the State provided funds in the amount of 
$100,000 for a limited analysis by the New York 
District with a view to deferring certain construction 
elements. 
Operations and results during period, and 
Condition as of September 30. Construction has not 
been initiated, but the project is in active status with 
work continuing on the preparation of General 
Design Memorandum and Environmental Impact 
Statement. 
2-16

NEW YORK, N.Y. DISTRICT 
SECTION II- ASBURY PARK TO 
MANASQUAN, N.J. 
Location. That portion of the Atlantic coast of New 
Jersey in Monmouth County extending from Asbury 
Park southerly to Manasquan - length about 9 
miles. 
Recommended project. Provides for Federal 
participation in the restoration and protection of the 
shore from Asbury Park to Manasquan by artificial 
placement of sand to widen the beach to a minimum 
width of 100 feet at an elevation of 10 feet above mean 
low water. The project provides for Federal 
participation in periodic nourishment costs for a 
period of 10 years from the year that the total quantity 
of fill placed has equalled that required to restore the 
beach to project dimensions in that section. Total 
estimated Federal cost is $21,000,000. Total 
estimated non-Federal cost for all requirements of 
local cooperation is $20,600,000. (See Table 2-B for 
Authorizing Legislation.) 
Operations and results during period, and 
Conditions as of September 30. The project is in 
active status with work on the Preconstruction 
Engineering & Design (PED) effort initiated in FY 
1987. The PED effort which is continuing will result 
in the development of a General Design 
Memorandum (GDM), Environmental Impact 
Statement (EIS), as well as the Plans and 
Specifications. 
30. OTHER AUTHORIZED BEACH 
EROSION CONTROL PROJECTS 
(See Table 2-H at end of chapter.) 
31. BEACH EROSION CONTROL 
WORK UNDER 
SPECIAL AUTHORIZATION 
Beach Erosion Control activities pursuant to 
Section 103 Public Law 826, 84th Congress as 
amended (preauthorization). 
(See Table 2-0 at the of chapter.) 
Flood Control 
32. ARDSLEY, N.Y. 
Location. The Village of Ardsley in Westchester 
County, New York is located on the Saw Mill River 
approximately 5 miles upstream from its junction 
with the Hudson River. (See U.S. Geological Survey 
Map, White Plains, N.Y.) 
Existing project. The Federal flood control project 
provides for relocation of the existing channel from 
the upstream limit of the project downstream for 
approximately 1,000 feet, and approximately 290 feet 
of concrete channel upstream of the new Ashford 
Avenue Bridge. Upstream of the concrete channel 
along the left bank of the Saw Mill River, 425 feet of 
floodwall will be constructed running north of the 
Conrail Bridge. Ponding areas, drainage ditches 
and other drainage structures will be provided. The 
total estimated Federal cost for the project is 
$4,830,000 exclusive of land, relocations and other 
work to be provided by local interests at an estimated 
cost of $1,610,000 (October 1987 P.L.). 
Local cooperation. In accordance with cost 
sharing and financing concepts reflected in S.1567, 
local interests are required to furnish all lands, 
easements and rights-of-way including relocations 
that are necessary for flood control improvements 
presently estimated at $840,000 and operate and 
maintain the project at an estimated cost of $82,000; 
interests pay 25 percent of the costs allocated to flood 
control for a total cost of $1,610,000 project cost but not 
less than that required by project authorization 
presently estimated at $1,610,000. The New York 
State Department of Environmental Conservation, 
the local sponsor, in an 11 December 1973 letter, 
indicated its intent to comply with the items of local 
cooperation and reaffirmed this on 15 August 1979 
and 23 August 1985. The State of New York, in a 18 
October 1985 letter, expressed this willingness to 
assume responsibility as local sponsor in 
accordance with the Cost Sharing and financing 
concepts agreed to by the Administration and 
Senator Majority Leadership Compromise as 
reflected in WRDA 1986. 
Operation and results during period. Preconstruction 
planning continued. 
Condition as of September 30. Plan of Study 
approved in March 1979. Construction has not been 
initiated. The lowest reach of the project was 
awarded 25 September 1987 and construction is 
expected to begin in late December 1987 or early 
January 1988. Construction of the middle and upper 
reaches will commence once the required Real 
Estate is received from the State. 
33. LIBERTY STATE PARK 
LEVEE AND SEAWALL, N.J. 
Location. At Liberty Park, in Jersey City, Hudson 
County, New Jersey, directly behind Ellis Island 
and Statue of Liberty, in Upper New York Bay. (See 
National Ocean Survey Chart 12334.) 
Existing project. Construction of a levee and sea 
wall, and pedestrian walkways; over 
environmentally sensitive areas. The construction 
of the levee project will allow the creation of a large 
Greenpark to include a wetlands preserve, an 
inland water course and boat basin, a marina, an 
amphitheater, indoor and outdoor recreation 
facilities, picnic areas, historic areas, community 
facilities, restaurants, plaza, and many other areas 
2-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
for both active and passive recreational and 
aesthetic benefit to visitors. The stone armored levee 
will also serve as a settlement-free base for 
subsequent construction of a tree-lined promenade, 
the Liberty walk, curving along the water's edge. 
The Federal cost of construction is estimated at 
$19,100,000; with an additional $19,100,000 
contribution by local interests including lands, 
certain relocations, utilities, and interior drainage. 
Local cooperation. In accordance with the project 
authorization, local interests are required to furnish 
all land, easements and rights-of-way including 
relocations, save those existing utilities passing 
through the proposed levee, necessary for the flood 
control improvements and to operate and maintain 
the project at an annual cost estimated to total 
$58,000. The State will assume all costs for 
construction of an interior drainage system to 
provide (10) year level of protection estimated to be 
$5,100,000. Local interests have agreed to 
voluntarily pay 50% of project cost. The New Jersey 
Department of Environmental Protection is the local 
sponsor. The local cooperation agreement was 
executed on 26 June 1986. 
Operation and results during period and 
Conditions as of September 30. Phase I is completed. 
A contract for the levee and seawall was awarded in 
February 1987 and will be completed in January 
1988, approximately one year ahead of schedule. 
Contract documents for the pedestrian walkways 
contract are being finalized and it is intended to 
advertise this contract in January 1988. 
34. PASSAIC RIVER BASIN, 
N.J. & N.Y. 
Location. The Passaic River Basin, comprising 
787 square miles in northeastern New Jersey and 
148 square miles in southern New York State, is 
located in the greater New York City Metropolitan 
area. The Passaic River Basin is roughly elliptical 
in shape 26 miles long and 56 miles wide - and 
contains portions of Bergen, Essex, Morris, Passaic, 
Hudson, Somerset, Sussex and Union Counties in 
New Jersey. The Basin also includes parts of 
Orange and Rockland Counties in New York. 
Previous projects. Two Federal flood control 
projects have been completed by the Corps of 
Engineers in Passaic River Basin. A $67,400 
desnagging, debris removal, and channel 
restoration project was completed in 1951 along 
Beaver Brook and the Pequannock Township Ditch, 
tributaries of the Pompton River in Pequannock 
Township, N.J. Along the Pompton River, a 
channel clearing project including shoal removal 
and channel restoration was implemented in the 
two-mile reach from the Delaware, Lackawanna 
and Western Railroad Bridge to the Erie Railroad 
(Greenwood Lake Branch) Bridge. This work, in 
Pequannock Township, Wayne Township and 
Lincoln Park Borough, N.J., was completed in 1954 
at a cost of $50,000. 
Existing project. The project was authorized for 
Phase I advance engineering and design study in 
Section 101(a) of the Water Resources Development 
Act of 1976 in accordance with the February 18, 1976 
report of the Chief of Engineers. The estimate of 
Federal cost under the authorizing legislation is 
$1,170,000,000 (October 1987 P.L.), plus a $235,000,000 
cash contribution from local interests and 
$155,000,000 for items of work to be contributed by 
local interests. The recommended plan for flood 
protection, navigation, hurricane protection and 
recreation, included a flood detention reservoir, 
channel diversions and modifications, levees and 
floodwalls, and streambank filling and grading. 
These works would provide protection against storm 
with a recurrence interval of 235 years, which is 20 
percent larger than the October 1903 flood of record. 
Six independent tributary local protection plans 
were also recommended. However, because of a 
lack of public support for structural components of 
the project in the New Jersey portion of the Basin, the 
entire project was reformulated during the Phase I 
study. 
The House Public Works Committee Report (94- 
1702) on the 1976 Water Resources Development Act 
directed "...the reformulation of the plan for water 
management and flood control for the entire Passaic 
Basin." This report further stated that local 
opposition to any plan which relies upon extensive 
use of dikes, dams and levees, such as those proposed 
in previous survey reports, mandates that the 
following alternatives, or any combination thereof, 
shall be the only ones surveyed and considered: (a) 
A full range of nonstructural flood control 
alternatives to include land acquisition, flood plain 
mapping, flood-proofing, developing early warning 
systems and relocation of buildings; (b) A tunnel 
diversion plan; (c) A system of tunnels addressing 
the needs of the entire basin; (d) Plans that combine 
local protection works where locally acceptable and 
nonstructural solutions including improvements to 
stream carrying capacity in accordance with 
different needs in the Lower Basin and in the 
Central Basin; (e) Evaluation of fulfilling water 
supply objectives together with flood control; (f) 
Aquifer recharge and underground storage; and (g) 
Reservoir management in the headwaters. The 
Phase I Study considered these alternatives in the 
formulation of revised plans. 
Conditions as of September 30. The reformulation 
study was initiated in October 1977 under the 
existing authorization and Congressional Guidance 
in House Report 94-1702. The Study schedule runs 
through September 1988 at an estimated cost of 
$21,000,000. A wide range of feasible Basin-wide 
alternative plans were developed. These 
2-18

NEW YORK, N.Y. DISTRICT 
alternatives, which were presented for extensive 
public review, included tunnel diversions, channel 
modifications, levees and floodwalls, and 
nonstructural measures. In April 1984, the Passaic 
Basin experienced flooding estimated to be the worst 
in 40 years. In June 1984, the State of New Jersey 
selected a dual inlet diversion tunnel plan as the 
local option for detailed plan formulation. A draft 
Phase I General Design Memorandum and draft 
Environmental Impact Statement, recommending 
the Pompton River/Passaic River Dual Inlet Tunnel 
Diversion Plan, were completed during FY 1986. 
Local protection plans were completed for tributary 
flood damage areas along the Ramapo and Mahwah 
Rivers at Mahwah, N.J., and Suffern, N.Y., Molly 
Ann's Brook at Haledon, Prospect Park and 
Paterson, N.J., the Ramapo River at Oakland, N.J., 
and the Lower Saddle River in Bergen County, N.J. 
These projects were authorized in the Water 
Resources Development Act of 1986. 
35. SAW MILL RIVER AT ELMSFORD 
AND GREENBURGH, N.Y. 
Location. On the Saw Mill River in the town of 
Greenburgh, N.Y. One portion known as Babbitt 
Court lies along the river immediately south of the 
Village of Elmsford. The second portion of the 
project, known as the Elmsford-Greenburgh area, is 
north of the Village of Elmsford, separated from 
Babbitt Court by approximately 4,000 feet. (See U.S. 
Geological Survey Map, White Plains, N.Y.) 
Existing project. The project provides for 
approximately 2.6 miles of 20 foot wide channel 
improvement along the Saw Mill River from the 
upper reaches in the Town of Greenburgh 
downstream to approximately Exit 7A of the New 
York State Thruway, with an additional 675 feet of 
channel modification along the tributary Mine 
Brook. A diversion channel will be constructed 
south of the Saw Mill River Parkway. The total 
estimated Federal cost (October 1987 P.L.) for the 
project is $4,680,000 exclusive of land, relocations 
and other work to be provided by local interests at an 
estimated cost of $1,570,000. (See Table 2-B for 
Authorizing Legislation.) 
Local cooperation. Local interests must provide 
lands and rights-of-way for construction, including 
borrow, ponding, and waste disposal areas; hold the 
United States free from damages; maintain and 
operate completed works; provide all alterations, 
relocations, and necessary replacements of existing 
facilities, including bridges, highways, sewers, 
utilities, and railroad modifications and 
relocations other than bridges and bridge 
approaches; protect the channel and other flood 
works from future encroachment or obstruction, 
including waste disposal which would reduce or 
otherwise impair their flood-carrying capacity, to 
compensate for any loss in ponding area 
effectiveness due to modification of or encroachment 
upon such areas; take appropriate measures to 
control development in partially protected areas and 
fringe areas not included in the project with a view 
toward preventing an undue increase in the flood 
damage potential; and at least annually, notify 
those affected that flooding will still be possible from 
large floods. New York State is Local Cooperating 
Agency. The New York State Department of 
Environmental Conservation, by letter dated June 
12, 1974, indicated the State's intention to cooperate 
in the proposed plan, and agreed to the current 
Administration's cost sharing by letter dated 11 
June 1986. 
Operation and results during period. During 
Phase I preconstruction planning the authorized 
project was found to be no longer economically 
justified. Phase I project reformulation to develop 
an alternative plan of improvement has been 
completed. 
Condition as of September 30. Plan of Study 
approved January 28, 1977. Preconstruction 
planning started in February 1977. The final Phase 
I General Design Memorandum was approved in 
March 1986. The final Phase II General Design 
Memorandum is scheduled for submission in April 
1988. 
36. INSPECTION OF COMPLETED 
FLOOD CONTROL PRECTS 
Inspections of completed flood control works and 
beach erosion and hurricane protection projects were 
performed to determine the extend of compliance by 
local interests with the requirements of operation 
and maintenance. 
37. OTHER AUTHORIZEDi 
FLOOD CONTROL PROJECTS 
(See Table 2-I at end of chapter.) 
38. DAM SAFETY PROGRAM 
Beginning in FY 1985 the New York District 
performed a two phase modification to Waterbury 
Dam in an attempt to drastically reduce or totally 
eliminate a long existing seepage problem at the 
dam. The first phase of construction is the addition 
of 48 inch pipe to the two existing 54 inch pipes that 
comprise the existing outlet works of the dam. This 
work was completed in July 1985 at a cost of $513,400. 
The second phase of work is the partial rebuilding of 
the toe of the dam to include a seepage filter and 
monitoring system and to fill voids by means of 
sand injection and to fill voids in the river gorge by 
grouting. The seepage filter was completed on 11 
November 1986 at a cost of $933,100. The sand 
injection and gorge grouting work was completed on 
2-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
17 December 1986 at a cost of $1,604,367. The sand 
injection and gorge grouting work was done by the 
Baltimore District for the New York District. In FY 
1987 the New York District completed inundation 
mapping, lands downstream of spillway studies, 
and seismic studies at Waterbury Dam, Vermont. 
Additionally, lands downstream from spillways 
studies and inundation mapping was completed for 
East Barre Dam, Vermont and Wrightsville Dam, 
Vermont. These studies were completed at a FY 1987 
cost of $105,000. 
39. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Natural Disaster and Emergency Flood Control 
Activities. (Pursuant to Public Law 84-99 and 
antecedent legislation) provides for advance 
preparation, emergency operations, rehabilitation, 
emergency drinking water, advance measures and 
drought assistance. 
Under disaster preparedness, the New York 
District completed revisions of various emergency 
manuals and pamphlets, attended meetings and 
seminars dealing with emergency response and 
preparation, provided in-house training to District 
employees in emergency operations activities, and 
purchased supplies and equipment to maintain its' 
flood fighting and response capability. 
Under emergency operations, the New York 
District provided technical assistance and sandbags 
to local, county and state governmental 
organizations which requested such aid during 
several minor storm/flood events. 
The New York District completed a rehabilitation 
report on damage to the North Ellenville Flood 
Control Project caused by the storm of 3-4 April 1987. 
The report recommended the repair and shoring of 
the floodwalls in specified sections as well as 
removal of rock outcrops within the channel. The 
work was subsequently approved by OCE. An 
emergency contract will be let under Rehabilitation 
Code 910-300 in FY 88. 
The District received a mission assignment from 
the Federal Emergency Management Agency 
(FEMA) under the provisions of PL93-288 to assist 
FEMA forces in the preparation of detailed damage 
survey reports for upstate New York counties 
following the Presidential Disaster Declaration 
resulting from the rain of March 30, 31 and 3, 4 April 
1987 in the Hudson River Basin (FEMA 792-DRNY). 
33 applicants in 3 of the 5 counties were 
surveyed for damages by District forces, including 
State agencies county and local governments. 
40. EMERGENCY STREAMBANK 
AND SHORELINE PROTECTION 
Activities pursuant to Section 14, Public Law 526, 
79th Congress as amended (Preauthorization). 
(See Table 2-Q at end of chapter.) 
41. SURVEYS 
(See Table 2-J at end of chapter.) 
42. COLLECTION AND STUDY 
OF BASIC DATA 
Costs for the period of $103,558 for flood plain 
management services are set forth in Table 2-L at 
the end of chapter. 
43. DEAUTHORIZED PROJECTS 
A total of 23 projects were deauthorized by 
Congressional Action pursuant to Section 12 of 
Public Law 93-251, Water Resources Development 
Act of 1976. (See Table 2-M at end of chapter.) 
2-20

NEW YORK, N.Y. DISTRICT 
TABLE 2-A 
See 
Section 
in Text Projects 
COST AND FINANCIAL STATEMENT 
Funding FY 84 FY85 FY 86 FY 87 Total Cost to 
September 30,1987 
1. Aquatic Plant 
Control 
2. Bay Ridge & Red 
Hook Channels, N.Y. 
3. Bronx River, N.Y. 
4. Browns Creek, N.Y. 
5. East Chester Creek, 
N.Y. 
6. East Rockaway Inlet 
7. Fire Island To 
Jones Inlet, N.Y. 
8. Hudson River, N.Y. 
New Work 
Approp 
Cost 
New Work 
Aprop. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
100,0( 
43,9I 
1,339,0( 
1,339,0( 
185,000 
176,102 
DO 
73 
00 7,059,000 
00 7,056,993 
- 60,000 
- 59,390 
- 199,790 
- 199,790 
220,000 170,000 
277,065 182,791 
164,000 2,842,000 
159,069 2,847,961 
837,000 
826,094 
- 717,000 
- 716,771 
- 390,034 2,030,000 
3,937 377,768 2,042,166 
- 1,695,700 
21,005 1,681,761 
-0- 
11,516 
18,412 148,000 
18,412 149,588 
- 50,000 
- 47,489 
50,000 
49,360 
60,000 
58,340 
425,000 
438,934 
1,293,806 1 
1,278,432 2 
5,523,297 
5,528,29727 
33,010,988 
33,010,011 
1,149,946 
1,149,946 
2,844,853 
2,844,853 5 
33,97630 
33,97630 
673,529 
673,369 
592,056 
592,056 
1,521,042 
1,519,302 
83,969 
533,334 4 
7,572,736 
7,571,946 
594,355 
594,35528 
5,185,404 
5,240,137 
- 44,249,8036,7,8 
- 44,249,865 
758,400 
1,299,002 
673,000 1,792,600 4,545,900 
,579,097 1,873,853 4,549,347 
33,921,315 
33,819,626 
2-21 
-~---' --- --- - - c 
- I''

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 2-A (Continued) 
See 
Section 
in Text Projects 
COST AND FINANICIAL STATEMENT 
Funding FY 84 FY85 FY 86 FY 87 Total Cost to 
September 30, 1987 
9. Jones Inlet, N.Y. 
10. Kill Van Kull-Newark 
Bay, N.J. & N.Y 
(Required 
Contributed 
Funds) 
11. Lake Montauk Harbor 
12. Long Island 
Intracoastal 
Waterway, N.Y. 
13. Moriches Inlet, N.Y. 
(Required 
Contributed 
Funds) 
14. Narrows of Lake 
Champlain, N.Y. 
15. Newark Bay, 
Hackensack & 
Passaic Rivers, N.J. 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Appr. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
98,000 1,709,966 
98,000 1,699,398 
-- 1155,00,00 00 
- 1,822,53010 
- 1,822,530 
128,500 
137,883 
240,000 
254,025 
1,354,000 
1,342,512 
7,100,000 
1,504,912 
3,869,000 
195,133 
203,000 
203,000 
70,862, 
100,000 
81,283 
- 125,000 
- 124,805 
450,000 
449,913 
15,000 
-0- 
975,000 776,000 
971,074 769,107 
95,000 2,475,000 
64,000 167,509 
-0- 
-0- 
-0- 
-0- -0- 
29,000 
28,744 
30,000 
29,326 
82,000 
82,930 
- 
1,196,615 
36,000 
30,379 
- - - 630,000 
- - - 630,000 
3,866,000 (295,000) 955,000 803,000 
3,936,107 (296,200) 956,975 799,434 
12,619,576 
12,607,002 
7,340,000 
1,773,937
- 
3,869,000 
195,133 
791,68037 
791,68037 
974,709 
974,514 
235,964 
235,964 
5,454,862 1 
5,456,956 1 
3,616,000 
1,243,791 
9,422 
9,422 
4,586,615 
681,81112 
681,811 
1,057,695 
1,052,053 
29,014,510 
9,014,51122,23 
29,009,036 
24,010,861 
2-22 
sl ---- -- L- -- I

NEW YORK, N.Y. DISTRICT 
TABLE 2-A (Continued) 
See 
Section 
in Text Projects 
COST AND FINANICIAL STATEMENT 
Funding FY 84 FY85 FY 86 FY 87 Total Cost to 
September 30, 1987 
16. New York and New 
Jersey Channels 
17. New York Harbor- 
Collection and 
Removal of Drift 
(Required 
Contributed 
Funds) 
18. New York Harbor- 
Entrance Channel 
and Anchorage Areas 
19. Raritan River, N.J. 
20. Rondout Harbor, 
N.Y. 
21. Shark River, N.J. 
(Other 
Contributed 
Funds) 
New Work 
Approp. 
Cost 
Maint. 
Aprop. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint & Oper 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New York 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
- 73,053,435 
- 73,052,43515,16,17 
8,704,000 1,162,000 1,332,000 794,000 
8,386,840 1,096,073 1,397,900 792,986 
7,102,359 
41,450,560 
454,773 
454,773 
2,700,000 
2,960,800 
2,700,000 
2,960,800 
1,380,950 
1,250,972 
1,930,000 2,105,000 3,657,000 
1,801,315 2,351,181 1,992,556 
2,820,000 
2,786,239 
707,096 
537,350 
3,210,000 3,145,000 
3,278,166 2,987,798 
470,459 
1,830,700 181,077 
32,991,000 
20,563,479 
42,192,89619 
42,387,718 
24,424,000 
23,471,670 
6,464,328 
7,424,32229 
- 45,009,71020 
- 45,009,710 
8,739,000 3,4419,900 
9,132,502 3,508,699 
4,033,000 2,013,000 
4,130,537 2,022,305 
42,395,524 
45,224,780 
- 1,,551,47021 
- 1,551,47025 
180,000 1,119,000 
177,126 1,119,269 
20,000 2,350,000 
22,004 2,345,369 
- 58,000 
- 58,000 
30,000 
29,295 
75,000 
70,814 
- 24,536 
- 24,041 
13,782,703 
13,777,671 
142,437 
142,437 
275,437 
271,251 
150,000 
150,000 
1,149,940 
1,149,322 
437,500 
335,083 
2-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 2-A (Continued) 
See 
Section 
in Text Projects 
COST AND FINANICIAL STATEMENT 
Funding FY84 FY 85 FY 86 FY 87 Total Cost to 
September 30, 1987 
22. Shinnecock Inlet, N.Y. 
23. Westchester Creek, 
N.Y. 
24. Supervisor of New 
York Harbor 
28. East Rockaway Inlet 
to Rockaway Inlet 
and Jamaica Bay, 
N.Y. (PI) 
(Required 
Contributed 
Funds) 
29. Sandy Hook to 
Barnegat, Int., NJ. 
32. Ardsley, N.Y. 
33. Liberty State Park 
and Seawall, N.J. 
(Required 
Contributed 
Funds) 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib 
Cost 
- 200,000 
- 200,000 
-0- 
200,000 
200,000 
-0- 
151 173 
- 175,9339 
- 175,933 
- 950,000 
- 932,244 
483,006 
526,571 
2,900,000 
2,918,123 
560,000 
564,738 
-0- 3,871,31111 
17,756 3,871,311 
577,000 600,000 
576,363 593,071 
2,250,000 3,445,000 
2,224,852 3,212,342 
50,000 
96,784 
- 2,316,000 3,145,000 -0- 
3,967 2,251,199 2,909,104 162,226 
- 1,300,000 1,435,000 2,300,000 
- 1,252,310 1,435,815 2,186,594 
45,000 
32,325 
15,000 
-0- 
- 20,000 
- -0- 
83,000 300,000 
83,000 237,963 
25,000 7,175,000 
20,250 6,093,751 
- 7,170,000 
- 5,999,657 
28,740,447 
29,215,827 
21,395,356 
21,180,553 
17,120,961 
19,438,942 
5,035,000 
4,873,704 
743,000 
653,287 
7,400,043 
6,294,089 
7,170,000 
5,999,657 
2-24 
--

NEW YORK, N.Y. DISTRICT 
1. Of which $12,500 is for North Atlantic Division 
Accounts. 
2. Of which $12,127 is for North Atlantic Division 
Accounts. 
3. Include $1,040,000 for new work and $1,040,000 
expended for the portion under construction general. 
4. Excludes $1'00,000 for new work expended from 
contributed funds and includes $82,600 for new work 
expended from public work fund. 
5. Includes $68,036 for new work and $216,931 for 
maintenance for previous projects. 
6. Includes $5,112,694 for new work for previous project. 
7. Includes $238,350 for new work expended from public 
works funds and $311,461 emergency relief runds. 
Excludes $81,373 expended from contributed funds. 
8. Excludes $454,273 expended between August 18 1915 
and June 30, 1935, for operation and care of lock and 
dam at Troy, N.Y., under permanent indefinite 
appropiation. Excludes $23,735 reimbursement for 
repairs to Troy Lock. 
10. Excludes $1,882,530 for new work expended from 
contributed funds. 
11. Includes $66,000 for maintenance for previous projects. 
12. Includes $115,000 for new work expended from 
contributed funds. 
15. Includes $ 12,809,975 for new work for previous 
projects and $6,621 for new work for Lemon Creek, 
Staten Island, N.Y. 
16. Excludes $7,712 for new work expended from 
contributed funds. 
17. Includes $807,000 for new work expended from public 
works funds and $2,023,308 for new work expended 
from emergency relief funds. 
18. Includes $1,160,380 for maintenance for previous project, 
and $1,621 for maintenance of Lemon Creek, Staten 
Island, N.Y. 
19. Includes $2,491,206 expended to date for construction of 
a land-based overfire air pit incinerator ($1,493,393 in 
maintenance funds and $997,813 in O&M funds). 
20. Includes $116,530 applied to removing wrecks authorized 
by acts prior to adoption of existing projects. 
21. Includes $673,155 for new work for previous project. 
22. Includes $1,836,403 for new work expended from 
contributed funds. 
23.: Excludes $285,600 for new work expended from 
contributed funds. 
24. Includes $1,490,715 for maintenance for previous 
projects. 
25. Excludes $292,685 for new work expended from 
Ordinance funds and $66,000 for new work expended 
from contributed funds. 
26. Includes $111,419 for maintenance for previous projects 
and $64,560 extended from public works funds. 
27. Include $1,246,100 for new work for previous projects 
and $64,560 extended from public works funds. 
28. Excludes $90,190 for new work expended from 
contributed funds. 
29. Includes $400,000 Jobs Bill funds. 
30. Includes $200,000 Jobs Bill funds. 
37. Excludes $104,805 for new work expended from 
contributed funds. 
2-25 
TABLE 2-A (Continued) COST AND FINANICIAL STATEMENT 
-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 2-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
River and Harbor 
Act of 1958 
AQUATIC PLANT CONTROL (See Section 1 of Text) 
Control and Progressive Eradication of obnoxious Aquatic 
Plant growths 
H. Doc. 37, 85th Cong., 
1st seas. 
Section 104 and Harbor Provided that all research and Planning cost to be borne fully 
Act of 1958 by the United States. 
Section 302 River and 
Harbor act of 1965 
Mar. 3, 1899 
Mar. 2, 1907 
July 3,1930 
Mar. 4,1913 
Sept. 19,1890 
May 17,1950 
July 3,1930 
Aug. 26,1937 
May 17,1950 
1958 River and 
Harbor Act 
1962 River and 
Harbor Act 
June 25,1910 
Mar. 3,1925 
July 3,1930 
July 1,1935 
Aug. 30, 1935 
Modified project to include control of waterchestnut. 
BAY RIDGE AND RED HOOK CHANNELS, N.Y. 
(See Section 2 of Text) 
Channel 40 feet deep and 1,200 feet wide. 
Dredging to obtain first a depth of 35 feet, subsequently 
increasing depth of 40 feet for full width. 
Widening of Bay Ridge Channel to 1,780 feet. 
BRONX RIVER, N.Y. (See Section 3 of Text) 
Channel 10 feet deep and 100 feet wide from East River 
to Dam at East 177th Street. 
BROWNS CREEK, N.Y. (See Section 4 of Text) 
6 foot channel for 1,850 feet and 4 feet 
for 1,350 feet, and 2 jetties. 
EAST CHESTER CREEK, N.Y. (See Section 5 of Text) 
Channel 10 feet deep and 150 to 70 feet wide. 
EAST ROCKAWAY INLET, N.Y. (See Section 6 of Text) 
Channel 12 feet deep and 250 feet wide, and a jetty. 
FIRE ISLAND TO JONES INLET, N.Y. 
(See Section 7 of Text) 
Construction of jetty. 
Channel 10 feet deep. 
Three dredging operations with sand serving as 
nourishment to the beaches westerly of the inlet. 
Extension of existing jetty, a littoral reservoir, a navigation 
channel and dikes, sand deposit on westery beaches. 
HUDSON RIVER, N.Y. (See Section 8 of Text) 
Channel 12 feet deep from Hudson to Waterford, remove State 
lock and dam at Troy and construct a new lock and dam. 
Channel 27 feet deep fromHudson to Albany, N.Y. 
Channel 27 feet below Hudson 
Operation and care of lock and dam at Troy were included 
in project. 
Relocation of 12-foot channel between Troy and Waterford 
H. Doc. 337, 54th Cong. 2d 
Sess. (Annual Report 
1899, P. 1177). 
Rivers and Harbors Committee 
Doc. 44, 71st Cong. 
2d sess. 
H. Doc. 897, 62d Cong. 
2d sess. 
H. Ex Doc. 22, 51st Cong. 
2d sess. 
H. Doc. 749, 80th Cong., 
2d sess. 
H. Doc. 19, 71st Cong., 
1st ses. 
Rivers and Harbor Committee 
Doc. 33, 75th Cong.1st sess. 
H. Doc. 762, 80th Cong., 
2d sess. 
H. Doc. 411, 84th Cong., 
2d ses. 1 
H. Doc. 115, 89th Cong., 
1st ses. 
H. Doc. 719, 61st Cong., 
2d sess. 
H. Doc. 350, 68th Cong., 
1st seas. 
H. Doc. 210, 70th Cong., 
1st ses. 
S. Doc. 155, 72nd Cong., 
2d sess. 
2-26

NEW YORK, N.Y. DISTRICT 
TABLE 2-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
June 20,1938 
Sep. 3,1954 
P.L. 89-72 
Mar. 2,1945 
Deepen channel between Albany and Waterford to 14 feet 
with no change in depths for harbors in front of Albany 
and Troy. 
Deepen channel between New York City and Albany to 32 
feet and construct a turning basin and 2 anchorages. 
Mooring facilities. 
JONES INLET, N.Y. (See Section 9 of Text) 
Construction of jetty and channel 12 feet deep and 250 feet wide. 
H. Doc. 572, 75th Cong., 
3d sess. 
H. Doc. 228, 83d Cong. 
1st sess. 
H. Doc. 409, 77th Cong. 
FY 1985 Supplemental 
Appropriations Act 
(PL99-88) 
Mar. 2,1945 
Aug. 26,1937 
July 14,1960 
Aug. 8,1917 
Mar. 2,1907 
Feb. 27,1911 
July 25,1912 
Jan. 21,1927 
July 3,1930 
Mar. 22,1945 
Mar. 2,1945 
Sept. 3,1954 
Oct. 23, 1962 
Nov. 7,1966 
KILL VAN KULL-NEWARK BAY, N.J. & N.Y. 
(See Section 10 of Text) 
Deepening existing 35 foot channels in increments 
to 40 feet and then 44 feet. 
LAKE MONTAUK HARBOR, N.Y. 
(See Section 11 of Text) 
Channel 12 feet deep and 150 feet wide, 10 foot boat basin; H. Doc. 369. 76th Cong., 
repair and extension of two jetties; and addition of sport fishing 1st sess. 
facilities on top of jetties. 
LONG ISLAND INTRACOASTAL WATER, N.Y. 
(See Section 12 of Text) 
Channel 6 feet deep and 100 feet wide. 
MORICHES INLET, N.Y. (See Section 13 of Text) 
Channel 10 feet deep and 200 feet wide in inlet and 6 feet 
deep and 100 feet wide in the Bay, and 2 jetties. 
NARROWS OF LAKE CHAMPLAIN, N.Y. AND 
VERMONT (See Section 14 of Text) 
Channel 12 feet deep and 150 feet wide. H 
NEWARK BAY, HACKENSACK AND PASSAIC RIVERS, N.J. 
(See Section 15 of Text) 
16-foot channel in Passaic River H 
Widening 16-foot channel in Passaic River 
20-foot channel in Passaic River. 
10-foot channel in Passaic River. 
30-foot channel in Passaic River. 
35 and 37 feet in main channel of Newark Bay and branch 
channel to an inshore channel at Port Neward terminal and 
remove portion of rock area at Bergen Point to same depths. 
Modification of local cooperation for 10-foot channel in 
Passaic River 
34-32 foot channel in Hackensack River including approach 
channel in Newark Bay from branch channel at Port 
Newark Terminal and a 25-foot turning basin. 
35-foot channels at Port Elizabeth. 
Widening 35-foot channel in Newark Bay, provision of two 
maneuvering areas, widening entrance into Port Elizabeth 
and Port Newark branch channels, deepening and widening 
Newark Bay 32-foot channel, and provision of a turning basin 
at junction of Hackensack and Passaic Rivers; and deepening 
12-foot channel in Hackensack River to 15 feet. 
H. Doc 181, 75th Cong., 
1st sess. 
H. Doc. 126, 86th Cong., 
1st sess. 
. Doc. 1387, 62d Cong., 
3d sess. 
. Doc. 441, 59th Cong., 
2d sess. 
. Doc. 441, 59th Cong., 
2d sess. 
. Doc. 707, 62d Cong., 
. Doc. 284, 60th Cong., 
H
HH 
2d sess. 
H. Doc. 156, 71st Cong., 
2 sess. 
S. Doc 250, 79th Cong., 
2d sess. 
H. Doc. 430, 76th Cong., 
1st sess. 
H. Doc. 252, 82d Cong., 
1st sess. 
H. Doc. 289, 88th Cong., 
2d sess. 
H. Doc. 494, 89th Cong., 
2d sess.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 2-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Additional widening at junction with Kill Van Kull 
by deepening to 35 feet a triangular area at the eastern 
end of the 30-foot channel south of Shooters Island. 
NEW YORK AND NEW JERSEY CHANNELS 
(See Section 16 of Text) 
Anchorage off Perth Amboy to 35 feet. 
Channels 35 feet deep from lower bay to upper bay, except 
between vicinity of Smith Creek and vicinity of Piles Creek 
to 30 feet with anchorage 38 feet deep at Sandy Hook and 
Perth Amboy. 
Channel 35 feet deep from vicinity of Smith Creek to 
vicinity of Piles Creek. 
Widen entrance to Kill Van Kull to 1,400 feet narrowing 
to a minimum width of 1,000 feet. 
Report on file in the Office of 
the Chief of Engineers. 
Rivers and Harbors Committee 
Doc. 17, 71st Cong., 2d sess. 
H. Doc. 133, 74th Cong., 
1st sess. 
H. Doc. 233, 81st Cong., 
1st sess. 
H. Doc. 108, 89th Cong., 
1st sess. 
NEW YORK HARBOR, COLLECTION AND REMOVAL 
OF DRIFT (See Section 17 of Text) 
Allotment from appropriations made for New York Harbor and 
its immediate tributaries may be used for collection and 
removal of drift in these waterways. 
Carrying on this work as a separate and distinct project. 
Increase scope of project to include removal and disposal P.L. 91-611, 91st 
of derelict vessels, some deteriorated shore structures and Cong., H.R. 19877 
debris along shores; and the repair of other shore structures; 
all subject to approval by Secretary of the Army and the President. 
Removal and disposal of derelict vessels, some deteriorated P.L. 93-251, 93rd Cong., 
shore structures and debris along shores and the repair 
of other shore structures. 
July 5,1884 
Mar. 3,1899 
June 25,1910 
Aug. 8,1917 
Aug. 8,1917 
Mar 2, 1919 
Jul. 3,1930 
Jul. 3,1930 
Jul. 3,1930 
NEW YORK HARBOR, ENTRANCE CHANNELS 
AND ANCHORAGE AREAS (See Section 18 of Text) 
Main-Ship-Bayside-Gedney to 30 feet for width of 1,000 
feet (dimensions fixed by Secretary of War, De. 27,1886 
by authority of Act of Aug. 5, 1886). 
Ambrose Channel (East Channel) to 40 feet. 
Maintenance of entrance channel under 1 head. 
Anchorage Channel, extension of Ambrose Channel 
into Upper Bay 
Removal of Craven Shoal 
RARITAN RIVER, N.J. (See Section 19 of Text) 
Channel 15 feet deep and 200 feet wide to Washington canal 
10 feet deep and 150 feet wide to canal locks and 
10 feet deep thru South Channel.7 
Channel 25 feet deep and 300 feet wide up to New York and 
Long Branch Railroad bridge. 
Channel 10 feet deep in earth and 11 feet in rock to 
New Brunswick. Width reduced to 100 feet. 
Relocation of lower reach to South Channel. 
Annual Reports 1887, p.6 2 
and 1888, p. 6 3 
H. Doc. 159, 55th Cong., 
3d sess. (Annual Report 
1899, p. 1279) 
H. Doc. 518, 63d Cong., 
2d sess. 
H. Doc. 557, 64th Cong., 
1st sess. 
H. Doc. 1341, 62d Cong., 
3d. sess. 
H. Doc. 127, 70th Cong., 
1st sess. 
H. Doc. 454, 70th Cong., 
2d sess. 
Rivers and Harbors Committee 
Doc. 31, 71st Cong., 
2d sess. 
2-28 
Sept. 6,1933 
Aug. 30,1935 
May 28, 1935 
May 17, 1950 
Oct. 27, 1965 
Mar.4,1915 
July 3, 1930 
Dec. 31, 1970 
Mar. 7,1974

NEW YORK, N.Y. DISTRICT 
TABLE 2-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 26,1937 
Oct. 17,1940 
Oct. 23,1962 
June 10,1872 
Aug. 30,1935 
Oct. 27,1965 
Mar. 2,1945 
July 14,1960 
Sept. 22,1922 
1965 Flood Control Act 
1974 Water Resources 
Development Act 
July 3,1958 
Section 201 
Flood Control Act 
of 1965 
1976 Water Resources 
Development Act 
Channel 25 deep and 300 feet wide to junction of main and 
south channels, thence of same depth on South Channel to 
Titanium Pigment Co. 
Channel 25 feet deep and 300 feet wide from junction of main 
south channels to government wharf, including a turning 
basin. 
In South Channel, maintenance of 15-foot channel to dock of 
Middlesex County Sewerage Authority. 
RONDOUT HARBOR, N.Y. (See Section 20 of Text) 
Parallel dikes, branch dike, and entrance channel, 
14 feet deep. 
Extension of 14-foot channel and for 12-foot channel., 
Extend 12-foot channel from mile 1.8 to 3.5. 
SHARK RIVER, NJ. (See Section 21 of Text) 
Channel 18 feet deep, 150 feet wide across entrance bar, 12 feet 
deep 100 feet wide to Route 35 bridge, 8 feet deep 100 feet wide 
to upper limit of Belmar boat basin; and 12-foot anchorage 
SHINNECOCK INLET, N.J. (See Section 22 of Text) 
Channel 10 feet deep and 200 feet wide in Inlet, and 
6 feet deep and 100 feet wide in the Bay, and 
2jetties. 
WESTCHESTER CREEK, N.Y. (See Section 23 of Text) 
Channel 12 feet deep and two turning basins. 
EAST ROCKAWAY INLET TO ROCKAWAY INLET 
AND JAMAICA BAY, N.Y. (PART 1). 
(See Section 28 of Text) 
Hurricane barrier, dikes, levees, floodwalls, fill, placement, 
stoplog structures, stairways, ramps, road raising, fishing 
platforms, annual nourishment. 
Authorized beach erosion control aspect to be constructed 
independent of the hurricane flood protection aspect of 
the project. 
SANDY HOOK TO BARNEGAT INLET, N.J. 
(See Section 29 of Text) 
Restoration of beach to minimum width of 100 feet at 
height of 10 feet above mlw, and construction of 23 
new groins and extension of 14 existing groins. 
ARDSLEY, N.Y. (See Section 32 of Text) 
Channel improvement, concrete flume, flood walls, levees, 
various drainage structures. 
LIBERTY STATE PARK LEVEE AND SEAWALL, NJ. 
(See Section 33 of Text) 
Approximately 7,000 feet of seawall and elevated pedestrian 
walkway. 
Rivers and Harbors Committee 
Doc. 74, 74th Cong., 
2d sess. 
Report on file in the Office. 
Chief of Engineers 
(report not printed) 
H. Doc. 455, 86th Cong., 
2d sess. 
S. Ex. Doc. 35, 42d 
Cong., 2d sess. Annual 
Report 1872, p. 810 
Rivers and Harbors Committee 
Doc. 17, 73d Cong., 2d sess. 
H. Doc. 288, 89th Cong., 
1st sess. (contains latest 
published map.) 
H. Doc. 102, 76th Cong., 
1st sess. 1 
H. Doc. 126, 86th Cong. 
1st sess. 
FY 83 Supplemental 
Appropriations Act 
Rivers and Harbors Committee 
Doc. 8, 67th Cong., 
2d sess. 
H. Doc. 215, 89th Cong., 
1st sess. 
H. Doc. 332, 85th Cong., 
2d sess., modified by Appr. 
Act for Energy and Water Dev. 
for FY 85. 
H. Doc. 215/89/1. 
2-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 2-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
1976 Water Resources 
Development Act 
Section 101(a) 
1965 Flood Control Act 
PASSAIC RIVER BASIN, N.J. & N.Y., PHASE I 
(See Section 34 of Text) 
Advanced engineering and design study, involving 
reformulation of plans for flood control and water 
resource management. 
SAW MILL RIVER AT ELMSFORD AND 
GREENBURGH, N.Y. (See Section 35 of Text) 
Levees, floodwalls, channel improvement. 
H. Rpt. 94-1702 
H. Doc. 94-465, 94th Cong., 
2d sess. 
2-30

NEW YORK, N.Y. DISTRICT 
TABLE 2-C HUDSON RIVER, N.Y. 
FEATURES OF LOCK AND DAM INCLUDED IN EXISTING PROJECT 
(See Section 8 of Text) 
Location: 
Below Waterford 
Above Battery, New York City 
Locks: 
Clear Width 
Greatest length available for full width 
Lift at lowest stages 
Depth on miter sills: 
Upper (at normal pool level) 
Lower (at lowest low water) 
2.2 miles 
152.6 miles 
44.4 feet 
492.5 feet 
17.3 feet 
16.3 feet 
13.0 feet 
Character of foundation: Rock 
Kind of dam: Fixed Crest 
Type of construction: Concrete 
Completed: 1917 
Cost: $1,463,014 
TABLE 2-D TOTAL COSTS FOR EXISTING PROJECT TO 
SEPTEMBER 30, 1987 
See 
Section Operation 
of Text Project Funds New York Rehabilitation Maintenance and Cost Total 
8. Hudson River, Regular $38,560,839 - $3,685,725 $863,621 $43,110,185 
N.Y. - Public Works 238,350 - - - 238,350 
Emergency Relief 311,461 - - - 311,461 
TOTAL $39,110,650 - $3,685,725 $863,621 $43,659,996 
16. N.Y. and N.J. Regular $57,412,152 - $ 792,986 - $58,205,138 
Channels Public Works 807,000 - - - 807,000 
Emergency Relief 2,023,308 - - - 2,023,308 
Contributed 7,712 - - - 7,712 
TOTAL $60,250,172 - $792,986 - $61,043,158 
TABLE 2-E SUPERVISOR OF NEW YORK HARBOR 
(See Section 24 of Text) 
STATEMENT OF ACTIVITIES-FY 1987 
1. Number of Patrols 
a. Shore 345 
b. Vessel 250 
Air (helicopter) 1 
Total 596 
2. Number of Inspections 
a. Shore Facilities 546 
b. Vessels 49 
Total 595 
3. Disposition of Cases 
a. Voluntary Restoration 63 
b. After-the-fact Permit Applications Accepted 23 
c. Permit not required or already under permit 297 
d. Submitted for litigation to OCE or US Attorney 3 
a Cases pending as of October 1,1982 220 
Total 606 
2-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
RECONNAISSANCE AND CONDITION SURVEYS 
FY 1987 
NAME OF PROJECT 
NEW JERSEY 
Cheesequake Creek................................................. 
Newark Bay Hackensack & Passaic Rivers. 
Raritan River ............................................................. 
Sandy Hook Bay at Leanardo............................ 
Shrewsbury River ................................................... 
NEW YORK 
* 
.Jan. 1987 
Sep. 1987 
* 
Browns Creek ................................................................................................................................................. 
Bronx River................................................. 
Coney Island Channel............................. 
Coney Island Creek.................................. 
Eastchester Creek...................................... 
East River...................................................... 
East Rockaway Inlet................................ 
Echo Bay Harbor.................................... 
Fire Island Inlet.......................................... 
Flushing Bay & Creek.............................. 
Glen Cove Creek........................................ 
Great South Bay......................................... 
Hudson River Channel........................... 
Huntington Harbor.................................. 
Jamaica Bay ................................................ 
Jones Inlet.................................................... 
Keyport Harbor ......................................... 
Lake Montauk Harbor ............................ 
Long Island Intracoastal Waterway. 
Mamaroneck Harbor .............................. 
Matawan Creek ......................................... 
Mattituck Harbor...................................... 
Milton Harbor ............................................. 
New Rochelle Harbor ........................... 
New York Harbor..................................... 
New York & New Jersey Channels.. 
Northport Harbor ..................................... 
Saugerties Harbor .................................... 
Westchester Creek .................................... 
. 
..Sep. 1986 
* 
..Oct. 1986 
* 
.May 1987 
.Oct. 1986 - Mar, Jul 1987 
* 
.Feb., Jul., Aug. 1987 
Jun.. Jul. 1987 
......Mar. 1987 
.....Apr. 1987 
* 
...... Jun., Jul. 1987 
...... Apr., Oct. 1987 
...A.p.r.. . 1987 
....... Mar. 1987 
.......Aug., Sep., Oct. 1986 
...D.ec... 1986 
...A.p.r.. 1987 
...... Aug., Sep. 1987 
...D.e.c... 1987 
.Dec. 1986-Jan., Mar. 1987 
.Dec. 1986-Feb., Mar. 1987 
* 
.1May 1987 
* 
*Items for which no date is furnished reflects costs for gathering data only. 
Total cost of Reconnaissance and Condition Surveys in Fiscal Year 1987 was $1,069,248. 
2-32 
TABLE 2-F 
DATE SURVEY CONDUCTED 
" 
............................................................... 
...................................................................................... 
....................................................................... 
....................................................................... 
.................................................................... 
....................................................................... 
....................................................................... 
I ~

NEW YORK, N.Y. DISTRICT 
TABLE 2-G OTHER AUTHORIZED NAVIGATION PROJECTS 
Cost to Sept, 30, 1987 
For Last 
Full Report 
See Annual Operation and 
Projects Report For Construction Maintenance 
Burlington Harbor Vt.1' 
Buttermilk Channel, N.Y. 
Channel between North and South Hero Island, 
Lake Champlain, Vt.1,2 
Coney Island Channel, N.Y. 
East Chester Creek, N.Y. 
East River, N.Y. 
Echo Bay Harbor, N.Y.' 
Flushing Bay and Creek, N.Y. 
Glen Cove Creek, N.Y. 
Gordons Landing, Lake Champlain, Vt.1,2 
Gowanus Creek Channel, N.Y. 
Great Chazy River, N.Y. 
Great Kills Harbor, N.Y.1,2 
Great Lakes to Hudson River Waterway, N.Y. 
Great South Bay, N.Y.' 
Greenport Harbor, N.Y.1' 
Harlem River, N.Y.1 
Hempstead Harbor, N.Y. 
Hudson River Channel, N.Y. 
Huntington Harbor, N.Y. 
Jamaica Bay, N.Y. 
Keyport Harbor, N.J. 
Larchmont Harbor, N.Y. 
Lemon Creek, N.Y. (Inactive)2,3 
Little Neck Bay, N.Y.1 
Mamaroneck harbor, N.Y. 
Manhasset Bay, N.Y. (Inactive)3 
Matawan Creek, N.J. 
Mattituck Harbor, N.Y. 
Milton Harbor, N.Y. 
Newtown Creek, N.Y. 
New Rochelle Harbor, N.Y.1,2 
Northport Harbor, N.Y.' 
Orowoc Creek, N.Y.(Inactive)3 
Otter Creek, Vt. 
Peconic River, N.Y.' 
Peekskill Harbor, N.Y.1' 
Plattsburgh Harbor, N.Y. 
Port Chester Harbor, N.Y. 
Port Henry Harbor, N.Y.1' 
Port Jefferson Harbor 
Raritan River to Authur Kill Cutoff Channel, N.J. 
Rouses Point, Lake Champlain, N.Y.' 
Sag Harbor, N.Y.1 
St. Albans Harbor, Lake Champlain, Vt.1,2 
Sandy Hook Bay, N.J. 
Sandy Hook Bay at Leonardo, NJ.1,2 
Saugerties Harbor, N.Y.1,2 
Sheepshead Bay, N.Y.1 
Shoal Harbor & Compton Creek, N.J. 
Shooters Island, N.Y. & N.J. 
Shrewsbury River, NJ. 
Staten Island Rapid Transit Railway Co. 
bridge across Arthur Kill, N.Y. 
1966 
1986 
1909 
1973 
1985 
1985 
1953 
1984 
1986 
1892 
1972 
1980 
1962 
1976 
1974 
1953 
1969 
1969 
1980 
1953 
1985 
1985 
1970 
1937 
1969 
1981 
1948 
1984 
1981 
1984 
1986 
1971 
1956 
1949 
1977 
1953 
1951 
1986 
1985 
1931 
1977 
1972 
1895 
1964 
1917 
1985 
1967 
1968 
1948 
1984 
1983 
1986 
1973 
2-33 
706,414 9 
4,590,20111 
31,000 
111,371 
592,05 6 
32,723,70012 
64,584 
2,102,905 7 
29,760 
34,750 
346,831 
18,000 
137,30115 
266,857 
74,681 
3,616,119 
39,468 
6,771,87027 
91,081 
4,545,753 
40,475 
76,065 
6,621 
1,741,21019 
513,764 
21,000 
177,925 32 
151,373 18 
1,168,354 
73,214 8 
78,64423 
60,254 
25,000 
19,400 
198,415 
433,470 
69,40625 
221,128 31 
810,500 
98,468 
121,80526 
3,125 
508,936 
56,470 
81,905 
33,828 
124,57220 
100,000 
1,145,457 
7,730,476 
283,556 
4,269,773 
1,288 
294,109 
1,519,302 
4,458,80012 
21,571 
4,352,089 
59,760 
115 
255,291 
292,919 
88,029 
457 
1,290,469 
21,720 
480,777 
76,49716 
24,970,637 
57,527 
2,632,160 
848,130 
267,768 
1,621 
537 
551,677 
4,636 
237,097 
935,786 
986,520 
1,675,292 
152,411 
11,487 
4,951 
27,059 
116,509 
66,037 
256,415 
1,060,100 
1,299 
359,294 
2,019,141 
249 
11,710 
385 
3,902,330 
93,964 
169,18128 
5,364 
1,104,940 21 
2,473,888

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 2-G (Continued) OTHER AUTHORIZED NAVIGATION PROJECTS 
Cost to Sept 30, 1987 
For Last 
Full Report 
See Annual Operation and 
Projects Report For Construction Maintenance 
Sumpawanus (Babylon Creek) Inlet, N.Y. 1,2 1895 7,000 13 
Tarrytown Harbor, N.Y. 1 1974 69,836 431,199 
Wallabout Channel, N.Y. 1 1953 18,174 36,312 
Wappinger Creek, N.Y.1,2 1950 13,000 44,691 
Washington Canal and South River, N.J.1 1953 206,116 212,827 30 
Waycake Creek, N.J.2,3 1949 - 2,781 
Woodbridge Creek, N.J.1 1953 48,823 178,398 
1. Completed. 
2. No commerce reported. 
3. Awaiting local cooperation. 
5. A portion of this project is classified "inactive." 
6. Includes $69,036 for new work and $26,921 for 
maintenance for previous project. Excludes $10,000 
for new work expended from contributed funds. 
7. Excludes $419,879 for new work expended from 
contributed funds and $580,425 contributed funds 
other and $8,752 expended by the Worlds Fair 
Corp. for riprap protection of rubble dike. 
8. Includes $43,175 for new work for previous 
projects. 
9. Includes cost of maintenance prior to July 1, 1886. 
Excludes $1,425,133 for rehabilitation. 
11. Includes $77,182 for new work for previous 
projects. 
12. Includes $6,187,690 for new work and $37,664 for 
maintenance for previous projects. 
13. Includes $4,813,400 for new work expended from 
emergency relief funds. 
14. Excludes $94,366 for rehabilitation. 
15. Excludes $104,805 for new work expended from 
contributed funds. 
16. Included $64,034 for maintenance of previous 
projects. 
17. Excludes $19,546 for new work expended from 
contributed funds and $31,454 to be contributed. 
18. Excludes $119,276 required contributed funds and 
$72,619 other contributed funds. 
19. Excluded $1,741,210 for new work expended from 
contributed funds. 
20. Includes $17,000 for new work for previous 
projects. 
21. Includes $169,700 for maintenance for previous 
projects. 
23. Excludes $15,000 for new work expended from 
contributed funds. 
24. Includes $16,369 for maintenance for previous 
projects. 
25. Excludes $1,000 for new work expended from 
contributed funds. 
26. Excludes $66,758 for rehabilitation. 
27. Includes $668,820 public works funds. 
28. Includes $15,000 for maintenance for previous 
projects. 
30. Includes $84,934 for maintenance for previous 
projects. 
31. Includes costs for new work $171,427 and 
maintenance $10,646 for previous projects. 
32. Excludes $34,580 for new work from contributed 
funds. 
2-34 
- -- --

NEW YORK, N.Y. DISTRICT 
TABLE 2-H OTHER AUTHORIZED BEACH EROSION 
CONTROL PROJECTS 
Cost to Sept. 30, 1987 
For Last 
Full Report 
See Annual Operation and 
Projects Report For Construction Maintenance 
Atlantic Coast of N.J., Sandy Hook to Barnegat Inlets 1959 - - 
Fire Island Inlet to Jones Inlet, N.Y. 1981 18,044,667 217,899 
North Shore of Long Island, Suffolk County, N.Y. 1979 8,880,000 - 
Perth Amboy, N.J. 1966 - - 
TABLE 2-I OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Construction to Sept. 30, 1987 
Full Report 
See Annual Operation and 
Projects Report For Construction Maintenance 
Adams, Hossic River Basin, Mass.1 1964 6,282,3072 - 
Bennington, Vt. 1974 670,000 - 
Byram River at Pemberwick, Conn.1,3 1959 363,515- 
East BarreDam, Winooski River, Vt.1 1963 2,878,334- 
East Rockaway Inlet to Rockaway Inlet 
and Jamaica Bay, N.Y. (Part II) 1976 1,185,365- 
Elizabeth, NJ. 1985 54,165,128 - 
Fire Island to Montauk Point N.Y. 1984 12,441,8646 143,753 
Herkimer, N.Y. 1973 1,206,9819 - 
Hoosic Falls, Hoosic River Basin, N.Y.'1 1956 1,064,626 - 
Lamoille River, Vt.: Hardwich Dams 4,5,6 1939 - - 
Missisquoi River at Richford, Vt. 1,3 1965 238,169 - 
North Adams, Hoosic River Basin, Mass. 1968 15,412,1027 - 
North Ellenville, N.Y. 1978 3,900,650 - 
Rahway, N .J. 1971 973,1426 - 
Rahway, South Branch, N.J. 1979 15,863,723 - 
Raritan Bay and Sandy Hook Bay, N.J. 1981 11,061,256 262 
Rosendale, N.Y. 1975 3,684,966 - 
Rutland, Otter Creek, Vt.4 1963 211,015 - 
Sandburg Creek, Spring Glen, N.Y. 1976 109,702 - 
South Amsterdam, Mohawk River, N.Y.1 1967 1,564,976 - 
South Ellenville, N.Y. 1984 289,702 - 
South Orange, N.J. 1981 6,857,484 - 
Staten Island, N.Y. 1983 644,998 - 
Wappinger Creek at Pleasant Valley, N.Y.1, 3 1959 142,075 - 
Waterbury Reservoir, Winooski River Basin, Vt. 1976 886,769 8,200 
Winooski River, Vt.1 1940 5,897,427 - 
Wrightsville Dam, Winooski River Basin, Vt. 1970 1,549,929 - 
Yonkers, N.Y. 1984 13,641,77110 
2-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
1. Completed. 6. Includes $3,788,341 contributed funds. 
2. Excludes costs of $913,360 under other contributed funds. 7. Excludes cost of $21,000 under other contributed funds. 
3. Authorized by Chief of Engineers pursuant to Sec. 205, 8. Excludes cost of $51,500 under otheer contributed funds. 
Public Law 858, 80th Cong., as amended. 9. Uncompleted portion has been deauthorized on August 
4. Inactive. 5,1977. 
5. Includes $213,507 emergency relief funds. 10. Includes $622,871 contributed funds. 
TABLE 2-J SURVEYS 
(See Section 41 of Text) 
Study Class Cost 
Navigation Studies 
Flood Control Studies 
Beach Erosion Studies 
Special Studies1 
Total Surveys 
$1,154,650 
4,478,207 
49,998 
371,269 
6,054,124 
1Includes review of Authorized Projects, Inspection of Dams, Coordination Studies with Other Agencies, Planning 
Assistance to States, International Water Studies Investigations, Review of FERC Licenses and Preconstruction Engineering 
and Design. 
TABLE 2-L COSTS FOR FLOOD PLAIN MANAGEMENT SERVICES 
(See Section 42 of Text) 
Studies and Services Cost 
Flood Plain Technical Services $41,624 
Flood Plain Management Unit 61,934 
Total 103,558 
TABLE 2-M DEAUTHORIZED PROJECTS 
(See Section 43 of Text) 
For Last 
Full Report Date Federal Contributed Operation 
See Annual And Funds Funds and 
Projects Report For Authority Expended Construction Expended Maintenance 
Bronx River, N.Y.4 ,6 
Brown's Creek, N.Y. 
Cheesequake Creek, N.J.4,6 
Coney Island Creek, N.Y. 4 ,6 
East Rockaway (Debs) Inlet, N.Y. 
Elizabeth, NJ. 
Glen Cove Harbor, N.Y. 
1981 
1980 
1953 
1952 
1963 
1948 
1966 
Aug. 1982 
Aug. 1977 
Aug. 1982 
Aug. 1982 
Aug. 1977 
Aug. 1977 
Aug. 1977 
1,149,946 
33,976 
40,000 
69,489 
3503,96913 
60,481 
165,882 
1,159,94612 
33,976 8 
40,000 
69,489 
100,000 
60,481 
165,882 4,11 
10,000 
829,421 
1,947,8536 
505,369 
30,675 
1,622 
- 
59,391 
2,455 
2-36

NEW YORK, N.Y. DISTRICT 
TABLE 2-M (Continued) DEAUITHORIZED PROJECTS 
For Last 
Full Report Date Federal Contributed Operation 
See Annual And Funds Funds and 
Projects Report For Authority Expended Construction Expended Maintenance 
Hudson River, NY( to Albany4,18 1982 Aug.1982 - - - - 
Huntington Harbor, N.Y. 1953 Aug. 1977 49,035 68,5814,5,14 19,546 51,566 
Irvington Harbor, N.Y. 1947 Aug.1977 - - - - 
Lamoille River, Vt. 1939 Aug.1977 49,837 49,837 - - 
Newark Bay, Hackensack 
and Passaic Rivers, N.1.J6 1982 Aug. 1982 - - - - 
New York and New Jersey 1982 Aug. 1982 - - - - 
Channels4,17 
Portchester Harbor, N.Y. 2,3 1967 Aug.1977 433,470 433,4704 - 441,656 
Proctor, Otter Creek, Basin, Vt.6,7 1937 Aug. 1977 - - - - 
Rahway River, 7,9 1948 Aug. 1982 - 37,0004 - 307 
Raritan River, N.J.4 6 1981 Aug. 1982 1,551,470 1,617,4701s 66,000 10,113,903 
Rome Mohawk River, N.Y.6 ,7 1959 Aug. 1982 7,000 7,000 - - 
Swanton Harbor, Vt. (Inactive)6 1888 Aug. 1977 - 70,5004 - 235 
Ticonderoga River, N.Y.1,6 1895 Nov. 1983 167,760 16,500 - 1,260 
Waterbury (1941 Act), Vt.7,6 1951 Nov. 1981 9,253 9,253 - - 
Waterford, N.Y.6,7 1939 Aug. 1982 - - - - 
Westchester Creek, N.Y. 1981 Aug. 1982 175,933 175,933 - 2,921,311 
1. No commerce reported. 10. Under Section 12 Public Law 93-251. 
2. Completed. 11. Includes $93,882 for Rehabilitation. 
3. A portion of this project is classified "inactive." 12. Includes $10,000 expended from contributed funds. 
4. Uncomplete portion deauthorized. 13. Includes $100,000 expended from contributed funds. 
5. Excludes $19,546 for new work expended from 14. Includes $19,546 expended from contributed funds. 
contributed funds and $31,454 to be contributed. 15. Includes $66,000 expended from contributed funds. 
6. Inactive. 16. 1912 authorization. 
7. Entire project deauthorized. 17. 1935 authorization. 
8. Excludes $71,423 for rehabilitation. 18. 1910 construction dikes. 
9. Deferred. 
TABLE 2-N SECTION 107 
(See Section 27 of Text) 
Name of Project Cost to Sept. 30, 1987 
CONTINUE RECONNANISSANCE REPORT 
Belford Harbor, N.J. $5,000 
2-37

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 2-0 SECTION 103 
(See Section 31 of Text) 
Name of Project Cost to Sept. 30, 1987 
CONTINUE RECONNAISSANCE REPORT 
Asharoken Beach, Huntington, J.Y. $10,000 
TABLE 2-P SECTION 205 
(See Section 39 of Text) 
Name of Project Cost to Sept. 30, 1987 
CONTINUE RECONNAISSANCE REPORT 
Great Chazy River, Champlain, N.Y. $10,000 
Hackensack River, N. Milford, N.J. 2,000 
McGregory Brook, Peekskill, N.J. 7,500 
CONTINUE DETAILED PROJECT STUDIES 
Missisquoi River, Vt. $16,600 
COMPLETE DETAILED PROJECT STUDIES 
Elizabeth River, Hillside, N.J. $16,500 
Sauquoit Creek, Whitesboro, N.Y. 5,900 
COMPLETE PLANS AND SPECIFICATIONS 
Ramapo River, Monroe, N.Y. $9,000 
TABLE 2-Q SECTION 14 
(See Section 40 of Text) 
Name of Project Cost to Sept. 30, 1987 
COMPLETE RECONNAISSANCE REPORT 
Green Brook, Somerset, N.J. $5,000 
COMPLETE PLANS AND SPECIFICATIONS 
Green Brook, Green Brook, N.J. $21,900 
2-38

PHILADELPHIA, PA DISTRICT * 
This district comprises a portion of southeastern New 
York, eastern Pennsylvania, western and southern New 
Jersey, northern and southeastern Delaware, and a small 
Part of northeastern Maryland embraced in the drainage 
Navigation Page 
1. Barnegat Inlet, NJ ........................ 3-2 
2. Cape May Inlet 
to Lower Twp., NJ........ .................. 3-2 
3. Cohansey River, NJ ....... ................. 3-3 
4. Cold Spring Inlet, NJ ....................... 3-3 
5. Delaware River between 
Philadelphia, PA and Trenton, NJ ........... 3-4 
6. Delaware River, PA, NJ, and DE 
Philadelphia to the Sea.................... 3-4 
7. Delaware River in Vicinity 
of Camden, NJ............................ 3-5 
8. Indian River Inlet and Bay, DE ............. 3-6 
9. Inland Waterway, Rehoboth Bay to 
Delaware Bay, DE........ .................. 3-6 
10. Inland Waterway from Delaware River 
to Chesapeake Bay, DE, and MD ............ 3-7 
11. Maurice River, NJ.......................... 3-8 
12. Mispillion River, DE....................... 3-8 
13. Murderkill River, DE ...... ................. 3-9 
14. Navigation Work Under Special 
Authorization............................. 3-9 
15. New Jersey Intracoastal Waterway .......... 3-9 
16. Salem River, NJ .......................... 3-10 
17. Schuylkill River, PA ........................ 3-11 
18. Waterway from Indian River Inlet 
to Rehoboth Bay, DE ...................... 3-11 
19. Wilmington Harbor, DE .................. 3-12 
Beach Erosion Control Page 
20. Shoreline Erosion Control.................... 3-12 
21. Beach Erosion Control Work 
Under Special Authorization ............... 3-13 
basins tributary to the Atlantic Ocean from Manasquan 
River, NJ inclusive, to south boundary of Delaware. It also 
includes Chesapeake and Delaware Canal and approach 
channel thereto in Chesapeake Bay and Elk River, MD. 
Flood Control Local Protection Page 
22. Beltzville Lake, PA........................3-13 
23. Blue Marsh Lake, PA......................3-13 
24. Delaware Coast Protection, DE ............. 3-14 
25. Flood Control Work Under Special 
Authorization ....... ....................... 3-14 
26. Emergency Bank Protection................ 3-14 
27. Francis E. Walter Dam, PA ................. 3-14 
28. General Edgar Jadwin Dam and 
Reservoir, PA ............................. 3-15 
29. Inspection of Completed Flood 
Control Projects...........................3-15 
30. Inspection of Non-Federal Levees ........... 3-16 
31. Prompton Lake, PA .................... 3-16 
32. Reconnaissance and Conditions 
Surveys .................................. 3-16 
33. National Emergency Preparedness.......... 3-16 
General Investigations Page 
34. Surveys ................................... 3-16 
35. Collection and Study of Basic Data ......... 3-16 
TABLES 
TABLE 3-A 
TABLE 3-B 
TABLE 3-C 
TABLE 3-D 
TABLE 3-E 
TABLE 3-F 
TABLE 3-G 
Page 
Cost and Financial Statement......3-17 
Authorizing Legislation........... 3-20 
Other Authorized 
Navigation Projects............... 3-25 
Other Authorized Beach 
Erosion Control Projects .......... 3-27 
Other Authorized Flood 
Control Projects..................3-27 
Multiple Purpose Project 
Including Power.................. 3-28 
Deauthorized Projects ............ 3-28 
*All costs and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also appear at the 
end of this chapter. 
3-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
NAVIGATION 
1. BARNEGAT INLET, NJ 
Location: On the east coast of New Jersey about 50 
miles south of Sandy Hook, between Island Beach on the 
north and Long Beach on the south (See U.S.Coast and 
Geodetic Chart Nos. 825 and 1216). This inlet is main 
entrance to Barnegat Bay, largest of the bays on New 
Jersey coast which are separated from the ocean by 
narrow barrier beaches. 
Previous Project: None 
Existing project: The existing project, adopted as 
HD 73-19 in 1935 and modified as HD 74-85 in 1937 and 
HD 79-358 in 1946, provides for a channel eight feet 
deep through the inlet and ten feet deep through the 
outer bar, protected by two converging stone jetties and 
a channel of suitable hydraulic characteristics 
extending in a northwesterly direction from the gorge in 
the inlet to Oyster Creek channel and through the latter 
channel to deep water in the bay. The project was 
modified in 1946 to provide for the maintenance of a 
channel eight feet deep and 200 feet wide to connect 
Barnegat Light Harbor with the main inlet channel. 
The project length is about 4.5 miles. (For details see 
page 203, Annual Report 1964.) 
The Supplemental Appropriation Act of 1985 
contained language stating that the existing project has 
not worked as projected and, in fact, has created a 
hazard to navigation. As a result, the following 
administratively approved modifications are to be 
constructed as design deficiency correction measures: a 
new south jetty 4,270 feet in length along an alignment 
generally parallel to the existing north jetty, extending 
from the existing groin located near the Barnegat 
Lighthouse to the tip of the existing south jetty; a 
navigation channel 300 feet wide to a depth of 10 feet 
below mean low water from the outer bar in the Atlantic 
Ocean to the north end of the existing sand dike in 
Barnegat Bay; remove the shoal located between the 
north jetty and the proposed navigation channel; jetty 
sport fishing facilities on the new jetty. All dredged 
material from initial construction would be placed on 
the shores of Barnegat Light between the existing and 
new south jetties, and would be stabilized by vegetation 
and sand fence. Dredged material from maintenance 
operations would be placed on the down draft beaches, 
the area between the existing and new south jetties, or 
in other locations as determined by a shoreline 
monitoring program. Estimated cost for new work 
(October 1985) Federal share is $11,000,000 and 
non-Federal is $25,800,000. (See Table 3-A at end of 
chapter for total cost for existing project to Sept. 30, 
1987.) 
Local cooperation: Fully complied with. A local 
cooperation agreement for the approved modification 
was executed on 19 May 1986 and a modification to the 
local cooperation agreement was executed on 20 March 
1987. 
Terminal facilities: There are four docks or 
terminals in inner harbor at Barnegat Light which 
furnish adequate facilities for present commerce of 
locality. 
Operations during fiscal year: Maintenance, 
contract: Work included velocity readings, subsurface 
explorations, surveys and tide gaging. 
New Work, contract: Initiate construction of new 
South Jetty. 
Maintenance, hired labor: Work included general 
maintenance and surveys. Work also included 
maintenance dredging by U. S. Government Side 
Casting Dredge FRY from 7 October 1986 to 31 October 
86 removing 25,245 cubic yards of material at a cost of 
$103,267; and from 12 February 87 to 14 April 87 
removing 157,290 cubic yards of material at a cost of 
$282,100. There was maintenance dredging by Dredge 
CURRITUCK from 28 May 1987 to 4 July 1987 
removing 96,990 cubic yards of material at a cost of 
$169,400. 
New Work, hired labor: Engineering and design, 
and supervision and administration. 
2. CAPE MAY INLET TO LOWER 
TWP., NJ 
Location: The proposed project is located in Cape 
May County and extends along the beach front from the 
northern side of Cape May Inlet to the boundary of 
Lower Township, and Cape May City. 
Existing project: The plan, as presented in HD 
94-641, was authorized for the Phase I Design 
Memorandum Stage of Advance Engineering and 
Design by Section 101a of the Water Resources 
Development Act of 1976, proposes the following 
features: breakwater on the updrift side of Cape May 
Inlet; beachfill from Cape May Inlet to Cape May Point; 
provision of a dune with sand fence and grass from Cape 
May Inlet to Wilmington Avenue; construction of two 
groins in Cape May City and seven groins in Lower 
Township; inclusion of all groins comprising the 
existing project; and periodic nourishment of the 
beaches and maintenance of the dune and dikes. 
The Phase I GDM, completed in August 1980 and 
approved by the Chief of Engineers in December 1981, 
determined that only beach erosion control measures in 
Cape May City are warranted. The plan proposed in that 
document for Cape May Inlet to Lower Township would 
provide; a weir-breakwater at Cape May Inlet with 
construction being deferred pending demonstration of 
need; two new groins at Trenton and Baltimore Avenues 
in Cape May City; placement of beachfill between Cape 
3-2

PHILADELPHIA, PA. DISTRICT 
May Inlet and the terminal groin at Third Avenue in 
Cape May City; maintenance of two new groins and 
existing groins in Cape May; periodic beach 
maintenance with material obtained from deposition 
basin on the northeast side of Cape May Inlet; and 
institution of a beach monitoring program in Lower 
Township area. Project estimate costs (October 1985) is 
Federal, $17,900,000. 
The existing authority is for Phase I studies as 
provided by Section 101(a) of the Water Resources 
Development Act of 1976 in accordance with the 
provision of House Document 94-641. Continuation of 
planning and engineering for this proposed project was 
initiated in October 1977. The Phase I GDM was 
completed in August 1980 and approved by the Chief of 
Engineers in December 1981. Phase II AE&D studies 
were completed in July 1983. The project was authorized 
for separable elements under Section 501(a) of the 
Water Resources Development Act of 1986, PL 99-662. 
(See Table 3-A at end of chapter for total cost for 
existing project to Sept. 30, 1987.) 
Local cooperation: The State of New Jersey 
furnished a letter of intent on 6 May 1981 regarding 
their willingness to comply with the above items of local 
cooperation. In addition, a draft Section 221 local 
cooperation agreement has been coordinated with letter 
of intent on 31 May 1983 regarding compliance with the 
items of local cooperation. 
Operations during fiscal year: New work, 
contract: Beach surveys, planemetric mapping, and 
groin surveys. 
New work, hired labor: Work included benefit 
reevaluation. 
3. COHANSEY RIVER, NJ 
Location: Rises in Salem County, NJ, flows 
southerly and southwesterly 27 miles through 
Cumberland County, and empties into Delaware Bay 
about 62 miles below Philadelphia, PA.(See Coast and 
Geodetic Survey Chart 1218). 
Previous projects: For details see page 1785, 
Annual Report for 1915, and page 348, Annual Report 
for 1938. 
Existing project: A channel 12 feet deep, 100 feet 
wide from that depth in Delaware Bay through a neck of 
land at the mouth and within the river to the south side 
of Glass Street in Bridgeton, 19 miles above the mouth; 
thence a channel 8 feet deep, 100 feet wide to Broad 
Street; and thence 75 feet wide to Commerce Street 
Bridge, 19.25 miles above the mouth; and a turning 
basin 12 feet deep and 800 feet long formed by widening 
the channel on the south side to a maximum width of 
250 feet just below Glass Street. Section included in 
project is about 19.5 miles long. All depths refer to the 
plane of mean low water. Extreme tidal range is from 
about 2 feet below mean low water to about 3 feet above 
mean high water. Completed project cost $110,756 for 
new work, exclusive of amounts expended on previous 
projects.(See Table 3-B at end of chapter for Acts 
authorizing existing project. See Table 3-A at end of 
chapter for total cost for existing project to Sept. 30, 
1987.) Existing project was completed in 1939. 
Local cooperation: Complied with except local 
interest must furnish suitable spoil-disposal areas for 
required maintenance. 
Terminal facilities: Twenty wharves, of which 16 
are at Bridgeton and 4 at Greenwhich. Facilities 
considered adequate for existing commerce. 
Operations during fiscal year: Maintenance, 
contract: Work included cultural resource and 
maintenance dredging by Paz Brothers, Inc. from 1 
October 1986 to 9 December 1986 removing a total of 
114,000 cubic yards of material at a cost of $400,000. 
Maintenance, hired labor: Work 
supervision and administration. 
included 
4. COLD SPRING INLET, NJ 
Location: In Cape May County, southern New 
Jersey, about 3 miles east of Cape May City and about 
16 miles northeast of Delaware breakwater. Inlet 
connects Cape May Harbor and New Jersey Intracoastal 
Waterway with the Atlantic Ocean and is about 1 mile 
long. (See Coast and Geodetic Survey Charts 234, 827 
and 1219). 
Existing project: An entrance channel 25 feet deep 
and 400 feet wide, protected by two parallel jetties, and 
extending from the 25-foot depth curve in the Atlantic 
Ocean to a line 500 feet harborward of a line joining the 
inner ends of the jetties, thence 20 feet deep and 300 feet 
wide to deep water in Cape May Harbor. The total 
length of the section included in the project is about 2.25 
miles. Extreme tidal range, due to ocean storms, is 
about 11 feet. Project was completed in 1942.(For details 
see page 238, Annual Report for 1962. See table at end of 
chapter for Acts authorizing existing project. See Table 
3-A at end of chapter for total cost for existing project to 
Sept. 30, 1987.) 
Local cooperation: Complied with Act of 1907, 
except work of deepening and enlarging inner harbor 
which is 80 percent complete. 
Terminal facilities: See page 238 Annual Report 
for 1962. 
3-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Operations during fiscal year: Maintenance, 
contract: Work included subsurface testing and 
surveys. 
Maintenance, hired labor: Work included general 
maintenance, hydrology studies, environmental and 
sand bypassing studies, study management, 
engineering and design, and plans and specifications. 
Also maintenance dredging by Dredge CURRITUCK 
from 30 July 1987 to 16 August 1987 removing a total of 
14,432 cubic yards of material at a cost of $71,450. 
5. DELAWARE RIVER BETWEEN 
PHILADELPHIA, PA, AND 
TRENTON, NJ 
Location: Rises in southeastern New York, flows 
generally southerly 367 miles, forming boundary line 
between New York and New Jersey on the east and 
Pennsylvania and Delaware on the west, and empties 
into Delaware Bay.(See U.S.Coast and Geodetic Survey 
Charts 1218, 280, 294, 295, and 296.) 
Previous projects: For details see page 1778 of 
annual report for 1915, page 311 of Annual Report for 
1924, page 220 of Annual Report for 1934, and page 296, 
Annual Report for 1938. 
Existing project: A channel from Allegheny 
Avenue, Philadelphia, 23.5 miles to upstream end of 
Newbold Island 40 feet deep and 400 feet wide, with 
suitable widening of bends, including relocation of 
channel at Delair Railroad bridge, and reconstruction of 
bridge, thence 5.5 miles to upper end of Trenton Marine 
Terminal, 35 feet deep and 300 feet wide, with a turning 
basin 800 feet wide and 1,700 feet long at the terminal; 
and maintenance of a channel 12 feet deep and 300 feet 
wide from upper end of 34-foot channel to Penn Central 
railroad Bridge at Trenton, dredged under a previous 
project. Project also provides for an auxiliary channel 20 
feet deep and 200 feet wide east of Burlington Island, 
extending easterly from main channel to upper end of 
U.S. Pipe and Foundry Co.'s property at East 
Burlington, with a turning basin 450 feet wide at upper 
end; for initial excavation, only, of a cross channel 8 feet 
deep and 200 feet wide through artificial island opposite 
Delanco, NJ, and for construction of such bank 
protection works as may be necessary. Section included 
in project is about 30.5 miles long, excluding auxiliary 
channel east of Burlington Island, which is 1.4 miles 
long, and cross channel opposite Delanco. Lower end is 
about 55 miles above river mouth at Liston Point and 
about 105 miles above Harbor of Refuge at mouth of 
Delaware Bay. Freshets, which occur usually during 
February and March, attain a height of 9 to 20 feet 
above mean low water in the vicinity of Trenton. 
Navigation is occasionally suspended during a portion of 
winter months due to ice. Existing project is 90 percent 
complete. A 40-foot channel under the 1954 modification 
from Allegheny Avenue to upper end of Newbold Island 
was completed April 1964. Work remaining is dredging 
from upper end of Newbold Island to Trenton Marine 
Terminal and widening turning basin at terminal which 
is in deferred category.(See Table 3-B at end of chapter 
for Acts authorizing existing project. See Table 3-A at 
end of chapter for total cost for existing project to Sept. 
30, 1987.) 
Local cooperation: Modification authorized by 
1954 River and Harbor Act provides local interests must 
provide suitable terminal facilities, furnish lands and 
rights-of-way for construction and future maintenance, 
and hold the United States free from damages. Local 
interest complied with requirements, except city of 
Trenton has not provided suitable terminal facilities. 
Terminal facilities: There are 21 piers, wharves, 
and docks from Allegheny Avenue, Philadelphia, PA to 
Trenton, NJ facilities are considered adequate for 
existing commerce. (For details see Port Series No. 8 
(revised 1966) Corps of Engineers.) 
Operations during fiscal year: Maintenance, 
hired labor: Work included general maintenance, 
surveys, environmental monitoring, engineering and 
design, and supervision and administration. 
6. DELAWARE RIVER, PA, NJ, 
AND DE, PHILADELPHIA TO 
THE SEA 
Location: See U.S.Coast and Geodetic Survey 
Charts 1218, 394, 295, and 280. 
Previous projects: For details see page 1779 of 
Annual Report for 1915, and page 299, Annual Report 
for 1938 
Existing project: Provides for a channel from deep 
water in Delaware Bay to a point in the bay, near Ship 
John Light, 40 feet deep and 1,000 feet wide; thence to 
Philadelphia Naval Base, 40 feet deep and 800 feet wide, 
with 1,200-foot width at Bulkhead Bar and 1,000-foot 
width at other bends; thence to Allegheny Avenue, 
Philadelphia, PA, 40 feet deep and 500 feet wide 
through Horseshoe Bend and 40 feet deep and 400 feet 
wide through Philadelphia Harbor, along west side of 
channel; and for anchorages at Reedy Point, Deepwater 
Point, Marcus Hook, and Mantua Creek, each 40 feet 
deep and 2,300 feet wide with respective length of 8,000, 
5,200, 12,650, and 11,500 feet; anchorage at Gloucester 
30 feet deep and about 3,500 feet long. Project also 
provides for construction of dikes and training works for 
regulation and control of tidal flow; for maintenance of 
an area on north side of channel opposite Philadelphia 
Naval Base between Shipway 3 and Schuylkill River to 
40 feet deep and width of 150 feet on Mifflin Range and 
200 feet on West Horseshoe Range; and for maintenance 
of any areas dredged by local interests to 35 feet deep 
3-4

PHILADELPHIA, PA. DISTRICT 
between channel and a line 100 feet channelward of 
pierhead line between Point House wharf and 
Philadelphia Naval Base, when in opinion of Chief of 
Engineers such areas are so located as to be of benefit to 
generate navigation. Section included in project is about 
96.5 miles long. All depths refer to plane of mean low 
water. Under influence of heavy and long-continued 
winds extreme tidal range is about 14 feet. Normal 
maximum velocity of tidal currents in the dredged 
channel varies between 2 and 3.5 miles per hour. Storm 
tides may increase maximum to as much as 4.5 miles 
per hour. Estimated cost for new work is $71,630,000 
(July 1972) exclusive of amounts expended on previous 
projects. Channel to 37 deep and 500 feet wide through 
Horseshoe Bend and 37 feet deep and 60 feet wide 
through Philadelphia Harbor along east side of channel 
and Port Richmond anchorage to 37 feet deep, except for 
that portion of channel which forms a part of 40 feet 
deep and 400 feet wide channel portion is to be restudied 
and excluded from foregoing cost estimate. Estimated 
cost (July 1960) of this portion of project is $2,951,000. 
Existing project, excluding work deferred for restudy, is 
about 66 percent complete. The 40-foot channel from 
Naval Base to the sea was completed in 1942. Dredging 
Naval Base to Allegheny Avenue to 40 feet deep was 
completed in 1962. Enlarging anchorage at Marcus 
Hook was completed in 1967. Work remaining is to 
construct new anchorages at Reedy Point and 
Deepwater Point, and enlarge Mantua Creek 
anchorage, channel dredging from 35 to 37 feet deep 
over a width of 500 feet through Horseshoe Bend and 
about 600 feet through Philadelphia Harbor, and 
deepening Port Richmond Anchorage to 37 feet, all of 
which have been deferred for restudy.(See Table 3-B at 
end of chapter for Acts authorizing existing project. See 
Table 3-A at end of chapter for total costs for existing 
project to Sept. 30, 1987.) 
Local cooperation: Requirements under 1938 
River and Harbor Act for maintaining channel and 
anchorage in Philadelphia Harbor annually by cities of 
Philadelphia and Camden were removed (see 1962 
Annual Report for details). 
Terminal facilities: There are 217 piers, wharves, 
and docks between Allegheny Avenue, Philadelphia and 
the sea, 135 oi the waterfront of Philadelphia, Camden, 
and Gloucester, and 82 below Philadelphia. Facilities 
are considered adequate for existing commerce.(For 
further details see Port Series Nos. 7, revised 1967, and 
8, revised 1966-Corps of Engineers.) 
Operations during fiscal year: Maintenance, 
contract: Work included lease and general 
maintenance of equipment, disposal area well testing 
and surveys. There was snag clearing maintenance of 
disposal area, rock removal, aerial mapping, and 
construction of bentonite trench at Penns Grove disposal 
area. There was maintenance dredging by Norfolk 
Dredging Company from 1 October 1986 to 20 December 
1986 removing a total of 2,058,271 cubic yards of 
material at a cost of $3,087,406; and by American 
Dredging Company from 12 June 1987 to 30 September 
1987 removing 1,300,000 at a cost of $2,000,000. Also, 
from 26 December 1986 to 4 March 1987 unclassified 
excavation was done by American Dredging Company 
removing 9,000 square yards of material at a cost of 
$1,844,968. 
Maintenance, hired labor: Work included general 
maintenance, surveys, disposal area well testing, short 
nose sturgeon studies, and, environmental coordination 
at Penns Grove. There was also, preparation of 
environmental document, BCR update, National Park 
drainage, construction of dikes, sluices and pipelines, 
disposal ditching, and plans and specifications on 
maintenance dredging. Aerial mapping, design of dike 
for Artificial Island and Killcohook, disposal area 
management planning, design of disposal area handling 
basin, and supervision and administration was done. 
Work included maintenance dredging by U.S. 
Government Hopper Dredge MCFARLAND from 24 
October 1986 to 11 November 1986 removing 60,441 
cubic yards of material at a cost of $516,906 and from 11 
August 1987 to 17 September 1987 removing 428,765 at 
a cost of $1,653,078. 
7. DELAWARE RIVER IN 
VICINITY OF CAMDEN, NJ 
Location: Camden, NJ, on east bank of Delaware 
River, is directly opposite city of Philadelphia, PA. It is 
about 51 miles above mouth of river and about 101 miles 
above Harbor of Refuge at mouth of Delaware Bay. (See 
U.S. Coast Guard and Geodetic Survey Charts Nos. 295 
and 280.) 
Previous projects: Adopted by River and Harbor 
Act of June 25, 1910. No work was done on this project, 
for further details, see page 321, Annual Report for 
1932. 
Existing project: The existing project which is a 
modification to the Delaware River from Philadelphia to 
the Sea project was adopted as House Document No. 
63-1120 in 1919 and modified by House Document No. 
70-111 in 1930 and House Document No. 77-353 in 1945. 
It provides for dredging in front of Camden to a depth of 
18 feet from Cooper Point to Berkley Street and 30 feet 
from the latter point to Newton Creek, with the depth 
increased to 37 feet in front of the Beckett Street marine 
terminal. These depths extend from the ship channel in 
Delaware River to a line parallel with and 50 feet 
distant from the established pierhead line. The project 
length is about four miles. Project depths are well 
maintained in 30-foot depth section of channel. Work 
was initiated to dredge the project depth of 37 feet in 
front of the Beckett Street Marine Terminal in FY 1987. 
Estimated cost for New Work (October 1985) is Federal, 
$3,220,000 and non-Federal, $1,545,000. (See Table 3-B 
at end of chapter for Acts authorizing existing project. 
3-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
See Table 3-A at end of chapter for total costs for 
existing project to Sept. 30, 1987.) 
Local cooperation: A Local Cooperation 
Agreement for the 37 foot project was executed on 28 
April 1987. 
Terminal facilities: There are 55 piers, wharves, 
and docks near project area along Delaware River 
waterfront at Camden and Gloucester, NJ, including 3 
oil terminals on Petty Island. Facilities are considered 
adequate for existing commerce. 
Operations during fiscal year: New work, 
contract: Work included initiating dredging of the 37 
foot project. 
New work, hired labor: Work included plans and 
specifications, preparation of draft and final LCA, and 
supervision and administration. 
8. INDIAN RIVER INLET AND 
BAY, DE 
Location: Indian River rises in Sussex County, DE, 
and flows easterly 13 miles into Indian River Bay which 
is a shallow lagoon 6 miles long and 2 miles wide on the 
Delaware Coast about midway between Cape Henlopen 
and the Maryland State line. The inlet is an opening 
through the barrier beach separating Indian River Bay 
and the Atlantic Ocean (See U.S.Coast and Geodetic 
Survey Chart No.1219.) 
Previous projects: Adopted by River and Harbor 
Act of August 2, 1882. For further details see page 744, 
Annual Report for 1888. 
Existing project: This provides for the fixation of 
the inlet by the construction of two parallel jetties of 
steel-sheet pile and stone design extending to 
approximately the 14-foot depth curve in the ocean, and 
for dredging an entrance channel 15 feet deep and 200 
feet wide, for a distance of 7,000 feet inshore from the 
jetties; thence a channel 9 feet deep, 100 feet wide in the 
bay, and 80 feet wide in the river, to and including a 
turning basin 9 feet deep, 175 feet wide, and 300 feet 
long at Old Landing; thence a channel 4 feet deep and 60 
feet wide to the highway bridge at Millsboro. The project 
also provides that the interior channel dimensions may, 
at the discretion of the Chief of Engineers, be modified 
as found desirable to increase the hydraulic efficiency of 
the channel, without increasing the cost. The total 
length of the section included in the project is about 
13.75 miles. All depths refer to the plane of mean low 
water. The extreme tidal range at the highway bridge is 
about 6 feet. Existing project was completed in 1951. For 
details see Annual Report for 1963.(See Table 3-B at end 
of chapter for Acts authorizing existing project. See 
Table 3-A at end of chapter for total costs for existing 
project to Sept. 30, 1987.) 
Local cooperation: Fully complied with except 
that local interest are required to furnish suitable areas 
for disposal of dredged material during maintenance as 
and when needed, and provide terminal facilities. 
Terminal facilities: There is a privately owned 
basin with berthing facilities for small boats located .75 
miles west of the highway bridge near the inlet and .25 
miles north of the inlet channel, connected therewith by 
a channel 6 feet deep and 40 feet wide; a U.S. Coast 
Guard wharf on the north side of the inlet channel in the 
same locality; and two wharves at Oak Orchard in 
Indian River Bay. The facilities are considered adequate 
for existing commerce. 
Operations during fiscal year: Maintenance, 
contract: Work included aerial mapping and repair to 
South Jetty. 
Maintenance, hired labor: Work included BCR 
update, hydrologic monitoring, and engineering and 
design. 
9. INLAND WATERWAY, 
REHOBOTH BAY TO 
DELAWARE BAY, DE 
Location: A tidal canal in southeasterly part of 
Sussex County, DE It extends 12 miles northward from 
Rehoboth Bay through high land west of town of 
Rehoboth to Gordon Lake; thence through marshes back 
of Cape Henlopen to Lewes River; thence down Lewes 
River to its junction with Broadkill River near its 
mouth. An entrance to the waterway from Delaware 
Bay is about 4 miles above Cape Henlopen.(See 
U.S.Coast and Geodetic Survey Charts 379, 1218, and 
1219.) 
Previous projects: A canal along a slightly 
different route formed a part of projected waterway from 
Chincoteague Bay, Va. to Delaware Bay, begun in 1886 
and abandoned in 1905. 
Existing project: This provides for an entrance 
channel near Lewes 10 feet deep and 200 feet wide 
protected by two parallel jetties 500 feet apart; thence a 
channel 10 feet deep and 100 feet wide to South Street 
Bridge at Lewes, and a basin of the same depth 1,200 
feet long and up to 375 feet in width at the latter point; 
thence a channel 6 feet deep and 50 feet wide (40 feet 
wide through Deep Cut near Rehoboth Bay) to Rehoboth 
Bay; a channel 6 feet deep and 100 feet wide from the 
entrance to Broadkill River; two parallel rubble jetties 
725 feet long at the Rehoboth Bay entrance; and the 
construction of one highway bridge and one railroad 
Bridge at Rehoboth. The total length of the section 
included in the project is about 12 miles. 
3-6

PHILADELPHIA, PA. DISTRICT 
The extension of the jetties at the Delaware Bay 
entrance is considered to be inactive and is excluded 
from the foregoing cost. The cost of the portion was last 
revised in 1960 and was estimated to be $816,000. 
Existing project is about 70 percent complete. For 
details on completed work see page 241 of Annual 
Report for 1963. Work remaining, extension of existing 
jetties at Delaware Bay entrance, is considered inactive. 
The Sheet Pile Jetty at the Delaware Bay entrance was 
removed during FY 1987. (See Table 3-A at end of 
chapter for total costs for existing project to Sept. 30, 
1987. See Table 3-B at end of chapter for Acts 
authorizing existing project.) 
Local cooperation: Complied with except local 
interest must furnish suitable terminal facilities and 
necessary spoil-disposal areas. 
Terminal facilities: See page 228, Annual Report 
1962. 
Operations during fiscal year: Maintenance, 
contract: Work included maintenance dredging by 
Garden State Dredging Company from 20 December 
1986 to 18 March 1987 removing 24,318 cubic yards of 
material at a cost of $148,636. Removal of sheet pile 
jetty at Delaware Bay entrance was accomplished. 
Maintenance, hired labor: Work included survey on 
maintenance dredging, plans and specifications, and 
supervision and administration. 
10. INLAND WATERWAY FROM 
DELAWARE RIVER TO 
CHESAPEAKE BAY, DE, AND 
MD 
Location: The Waterway begins at Reedy Point on 
Delaware River, about 41 miles below Philadelphia, PA, 
and passes through the sea level Chesapeake and 
Delaware Canal, a distance of 14 miles, to Back Creek, 
at Chesapeake City, MD. It then passes for 5 miles down 
Back Creek, thence 9 miles down Elk River to 
Chesapeake Bay and thence 18 miles down Chesapeake 
Bay to a point near Pooles Island. A branch channel 
connects Delaware River at Delaware City, DE, with 
main channel at a point about 1.5 miles west of Reedy 
Point. (See U.S.Coast and Geodetic Survey Charts 294, 
1226, 570, and 572.) 
Previous projects: For details see Annual Report 
for 1934, page 242, and Annual Report for 1938, page 
312. 
Existing project: A channel 35 feet deep and 450 
feet wide from Delaware River through Elk River and 
Chesapeake Bay to water of natural 35-foot depth in 
Chesapeake Bay including a cutoff at Penn Central 
Railroad crossing, and having a maximum radius of 
curvature of 7,000 feet at bends; a high-level, fixed 
railroad bridge with vertical clearance of 135 feet and 
horizontal clearance of 600 feet at the railroad crossing 
over the cutoff (economic study of railroad crossing 
requested by Office of Management and Budget resulted 
in construction of a single track vertical lift bridge in 
lieu of a high-level fixed railroad bridge); high-level 
fixed highway bridges over canal at Reedy Point, St. 
Georges, Summit, and Chesapeake City; a bascule 
drawbridge across Delaware City Branch Channel; 
extension of entrance jetties at Reedy Point; and 
anchorage in Elk River, 35 feet deep and 1,200 feet wide, 
with an average length of 3,700 feet; enlargement of 
anchorage and mooring basin in Back Creek to afford an 
area about 400 feet wide, 1000 feet long, and 12 feet 
deep; dredging Delaware City Branch Channel to 8 feet 
deep and 50 feet wide, and deepening existing basin to 
same depth; revetment of banks of canal as required 
between Delaware and Elk Rivers, and on banks of 
Delaware City Branch Channel east of Fifth Street 
Bridge; and construction of bulkheads. Total of section 
included in project, excluding Delaware City Branch 
Channel, which is about 2 miles long, is about 46 miles. 
All depths refer to plane of low water in Delaware River. 
Extreme tidal range is from 6.3 feet above mean high 
water to 3 feet below mean low water. Existing project is 
about 89 percent completed. Channel 27 feet deep and 
250 to 400 feet wide. Delaware River to Pooles Island, 
completed in 1938. High-level fixed highway bridges 
were completed at St. Georges (4-lane) in 1942; at 
Chesapeake City (2-lane) in 1949; and at Summit 
(4-lane) in 1960. Relocation of Penn Central Railroad 
bridge was completed December 21, 1965. Enlargement 
to 35 feet deep and 450 feet wide St. Georges and 
Summit bridges and Summit and Goose Island was 
completed on June 20, 1972 and February 18, 1972, 
respectively. Removing the old Penn Central railroad 
bridge was completed on January 21, 1972. Channel 
work for Part II is about 87 percent complete. Work 
remaining consists of completing channel enlargement 
to 35 feet deep and 450 feet wide between Reedy Point 
Bridge and St. Georges Bridge; widening and deepening 
the channel between Delaware River and Reedy Point 
Bridge, the completion of recreation facilities, and 
miscellaneous completion items. Deepening of the 
Delaware City Branch Channel from 6 to 8 feet from a 
point 400 feet east of Fifth Street Bridge to its junction 
with the canal has been deferred for study. 
Original cost of canal including purchase was 
$10,709,755; estimated cost of new work for 
modifications of 1935 and 1954 is $139,574,000 (October 
1985). Total estimated cost of new work includiig 
original purchase is $147,534,000. Portion of project 
comprising completion of Delaware City Branch 
Channel from a point 400 feet east of Fifth Street Bridge 
to its junction with canal is to be restudied and excluded 
from foregoing estimate. Estimated cost of this portion 
is $145,000 (July 1954).(See Table 3-A at end of chapter 
for total costs for existing project to Sept. 30, 1987. See 
Table 3-B at end of chapter for Acts authorizing existing 
project.) 
3-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Local cooperation: River and Harbor Act of 1954 
provided that local interests furnish lands and 
rights-of-way required for bridges. Assurances accepted 
and approved February 16,1955. Requirements for 
Summit and Reedy Point Bridges have been met. 
Terminal facilities: Ample mooring facilities at 
eastern and western ends of canal and bulkheads at 
Delaware City and St. Georges were constructed by the 
United States. A small-boat harbor was provided and a 
wharf constructed at Chesapeake City. Facilities are 
considered adequate for existing commerce. 
Operations during fiscal year: Maintenance, 
contract: Work included finalization of sludge 
monitoring document, environmental monitoring, 
painting of Chesapeake City Bridge and St. Georges 
Bridge, repair to 5th St Bridge and night lighting. 
Installation of computer on Reedy Point Bridge was 
accomplished. There was also maintenance dredging by 
Norfolk Dredging Company from 1 October 1986 to 23 
December 1986 and 15 July 1987 to 30 September 1987 
removing a total of 3,418,252 at a cost of $6,009,878. 
Rehabilitation, design memo, and repairs on Summit 
Bridge. 
Maintenance, hired labor: Work included 
maintenance dredging by U.S Government Hopper 
Dredge MCFARLAND 11 November 1986 to 15 
December 1986 removing a total of 418,961 cubic yards 
of material at a cost of $1,739,858. There was also 
dredging from 29 June 1987 to 10 August 1987 
removing a total of 333,347 cubic yards of material at a 
cost of $1,739,845. Work included general maintenance 
and design of disposal areas and bridges, maintenance of 
rip-rap, roadways, canal banks, night lighting, building 
and grounds, banks, auxiliary roads and traffic 
controlled TV. Also accomplished was environmental 
drainage of disposal areas, lease of equipment, bridge 
inspections, trash removal, engineering surveys, 
environmental monitoring, advance maintenance 
dredging and commercial activity studies, Summit 
Bridge Deck overlay. Pipelines were submerged, plans 
and specifications accomplished. Sub-surface testing of 
disposal areas, Reedy Point Bridge computer 
installation, repair of 5th St. Bridge, engineering and 
design, and supervision and administration were 
completed. 
11. MAURICE RIVER, NJ 
Location: This river rises in Gloucester County, NJ 
flows southerly and southwesterly 33 miles through 
Cumberland County, and empties into Delaware Bay 
through Maurice Cove about 87 miles below 
Philadelphia, PA. (See U.S. Coast and Geodetic Survey 
Chart No. 1218.) 
Previous projects: Adopted by the River and 
Harbor Act of August 2, 1982, and modified in 1890 and 
1892. For further details, see page 1785, Annual Report 
for 1915. 
Existing project: The existing project adopted as 
HD 59-644 in 1910 and modified as HD 73-275 in 1935. 
This provides for a channel 8 feet deep and 150 feet wide 
in Delaware Bay across Maurice Cove to the mouth; 
thence a channel 7 feet deep, 100 feet wide to the fixed 
bridge at Millville, a distance of twenty one and one-half 
miles, including a turning basin 7 feet deep at Millville. 
The total length of the section included in the project is 
about 24 miles. All depths refer to the plane of mean low 
water. The extreme tidal range is from about 1 foot 
below mean low water to about 1 foot above mean high 
water. Work remaining to be done is the deepening of 
the entrance channel from 7 feet to 8 feet, and the 
dredging of a channel 7 feet deep, 60 feet wide and 650 
feet long in the upper end of the project. The entrance 
channel portion of the project has been made inactive 
due to a problem with local cooperation, whereas the 
unconstructed portion at the upper end of the channel 
was deauthorized 2 November 1979, under Section 12, 
PL 93-251. (See Table 3-A at end of chapter for total 
costs for existing project to September 30, 1987.) 
Local cooperation: Fully complied with. 
Terminal facilities: There are numerous wharves 
and piers at the several towns along the river. Public 
wharves are located at Millville, Mauricetown, 
Dorchester, and Bivalve. Several boat yards with 
railways and repair and construction facilities are also 
located along the river. Most of the wharves at Millville 
and Bivalve have railroad connections. The facilities are 
considered adequate for existing commerce. 
Operations during fiscal year: Maintenance, 
hired labor: Work included engineering and design. 
12. MISPILLION RIVER, DE 
Location: Rises in Kent and Sussex Counties, DE, 
flows northeasterly 15 miles along the boundary line 
between the two counties and empties into Delaware 
Bay about 16 miles above Cape Henlopen.(See Coast 
and Geodetic Survey Chart 1218.) 
Previous projects: For details see page 1786, 
Annual Report for 1915, page 448 of Annual Report for 
1918, and page 327 of Annual Report for 1938. 
Existing project: Project is about 31 percent 
complete. Four cutoffs for 6-foot channel were completed 
in 1923; 6-foot channel from Delaware Bay to Milford in 
1924; and jetties at the mouth in 1939. Work remaining 
is dredging channel to 9-foot depth, 80 feet wide in 
Delaware Bay to the mouth, thence 60 feet wide to 
Milford, with the provision of three cutoffs to eliminate 
bends, and a turning basin at Milford. Controlling 
depths at mean low water; in October 1964 from 
3-8

PHILADELPHIA, PA. DISTRICT 
Delaware Bay to mouth 7.1 feet, and thence to fixed 
highway bridge at Milford, 6.1 feet. For details see page 
243 of Annual Report for 1957. (See Table 3-A at end of 
chapter for total costs for existing project to Sept. 30, 
1987.) 
Local cooperation: Assurances required by 1954 
River and Harbor Act have not been furnished. For 
details see page 243, Annual Report for 1957. Prior 
requirements fully complies with. 
Terminal facilities: For details see page 244, 
Annual Report for 1957. 
Operations during fiscal year: Maintenance, 
hired labor: Work included maintenance dredging, 
engineering and design, and supervision and 
administration. 
13. MURDERKILL RIVER, DE 
Location: Rises in Kent County, DE, flows 
northeasterly 19 miles through county, and empties into 
Delaware Bay about 25 miles above Cape Henlopen. 
(See U.S. Coast and Geodetic Survey Chart no. 1218.) 
Existing project: Provides for a channel 7 feet deep 
at mean low water, 150 feet wide in Delaware Bay to 
mouth, and thence 80 feet wide to Frederica, 7.5 miles 
above mouth. Total length of section included in project 
is about 8.5 miles. Extreme tidal range is from about 1 
foot below mean low water to about 2 feet above mean 
high water. 
Estimated cost for new work revised in 1954 is 
$38,000. Portion comprising widening channel to project 
width throughout its length is to be restudied and 
excluded from foregoing cost estimate. Estimated cost of 
this portion last revised in 1954 was $86,000. Project 
was authorized by River and Harbor Act of July 13, 1892 
(H. Ex. Doc. 21,52d Cong., 1st Sess. See page 981 
Annual Report for 1892). Latest published map is in 
House Document 1058, 62d Congress 3d Session. 
Existing project about 30 percent complete, including 
revision to be restudied. Channel 7 feet deep and 60 feet 
wide was completed in 1911. Work remaining is 
widening the channel to project width. (See Table 3-A at 
end of chapter for total costs for existing project to Sept. 
30, 1987.) 
Local cooperation: None required. 
Terminal facilities: There are a number of light 
timber wharves on both sides of river near mouth and 
two wharves at Frederica, all privately owned. Facilities 
are considered adequate for existing commerce. 
Operations during fiscal year: Maintenance, 
contract: Work included maintenance dredging by 
Garden State Dredging Company from 1 October 1986 
to 30 November 1986 removing a total of 17,770 cubic 
yards of material at a cost of $137,320. 
Maintenance, hired labor: Work included 
maintenance dredging, plans and specifications, and 
supervision and administration. 
14. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation Activities Pursuant To Section 107, 
Public Law 86-645 (Preauthorization) 
Name of Project Cost to 30 Sep 1987 
Detail Project Reports 
Schuylkill River-Fairmount Park, PA 
Reconnaissance Reports 
Gardners Basin, NJ 
Wills Hole Thorofare, Pt. Pleasant, NJ 
Plans and Specifications 
Wilmington Harbor, DE 
$1,375 
$6,287 
$4,624 
$61,532 
15. NEW JERSEY INTRACOASTAL 
WATERWAY 
Location: A sea level inland water route 
approximately parallel with New Jersey coast, extends 
from Atlantic Ocean at Manasquan Inlet, about 26 miles 
south of Sandy Hook, NJ to Delaware Bay about 3 miles 
above Cape May point. Waterway extends through inlet 
and up Manasquan River about 2 miles; thence by Point 
Pleasant Canal through high ground for 2 miles to head 
of Barnegat Bay. It then passes through a series of bays, 
lagoons, and thoroughfares along New Jersey coast to 
Cape May Harbor; thence across Cape May County to 
Delaware Bay through a land cut by way of New 
England Creek basin.(See U.S.Coast and Geodetic 
Survey Charts, 234, 795, 825, 826, 827, 1216, 1217, 
1218, and 1219.) 
Existing project: This provides for a channel 12 
feet deep at mean low water and generally 100 feet wide, 
extending from the Atlantic Ocean at Manasquan Inlet, 
NJ to Delaware Bay above Cape May, NJ, by the further 
improvement of Manasquan River and Inlet, NJ, and 
the present New Jersey Intracoastal Waterway, and by 
the construction of a canal of similar dimensions from 
Cape May Harbor to Delaware Bay via the New 
England Creek basin, with adequate jetties at the 
Delaware Bay entrance. The total length of the project is 
about 117 miles. Normal tide range in sections of the 
waterway remote from inlets is 0.5 foot. 
3-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Estimated cost for new work is $71X549 (July 1969), 
exclusive of $1,824,940 Navy Department funds and 
$99,000 contributed by local interests. Portion of project 
extending from Manasquan River to Cape May Harbor 
is to be restudied and excluded from new work costs 
estimate. Estimated cost of this portion is $6,470,000 
(July 1954). Existing project was adopted by 1945 River 
and Harbor Act (H.Doc 133, 76th Cong., 1st Sess.) Latest 
published map is in project document. River and Harbor 
Act of 1946 (Public Law 525,79th Cong., 2nd Sess., as 
extended by Public Law 240,82d Cong.), authorized use 
for a period not to exceed 6 years, of funds from 
appropriations heretofore or hereafter made for 
maintenance and improvement of rivers and harbors, 
for maintenance of canal from Cape May Harbor to 
Delaware Bay constructed as an emergency wartime 
project with Navy Department funds, including cost of 
maintaining temporary railroad and seashore highway 
bridges over canal. 
Existing project is about 25 percent complete. A canal 
12 feet deep and 100 feet wide from Cape May Harbor to 
Delaware Bay was completed in 1942 as well as two 
parallel stone jetties at Delaware Bay entrances and a 
temporary highway and a railroad bridge in 1944, all 
with Navy Department funds. Work remaining consists 
of dredging a channel 12 feet deep and 100 feet wide 
from Atlantic Ocean at Manasquan Inlet to Cape May 
Harbor, has been deferred for restudy; however, the 
project between Ottens Harbor and Richardson Channel 
and from that point to Cape May are being maintained 
to 10 feet and 12 feet, respectively, since they were 
originally dredged to these depths by the State. Section 
860 of the Water Resources Development Act of 1986 
authorized a 15 foot depth in the Vicinity of Cape May 
Harbor, titled as Cold Spring Inlet. (See Table 3-A at 
end of chapter for total costs for existing project to Sept. 
30, 1987.) 
Local cooperation: The project is subject to the 
conditions that the State of New Jersey cede to the 
United States all right, title, and interest that it has 
acquired to lands, easements, rights-of-way, and 
structures other than bridges for the Bayhead- 
Manasquan Canal; that the State of New Jersey furnish, 
free of cost to the United States, all lands, easements, 
rights-of-way, and disposal areas required for 
construction of the Cape May Canal and for 
improvement of the proposed waterway and for their 
subsequent maintenance; that local interests provide, 
maintain, and operate suitable bridges over the 
waterway; that the State of New Jersey -donate to the 
United States the navigation aids in use on the present 
New Jersey Intracoastal Waterway; and that the State 
of New Jersey hold and save the United States and its 
agents free from any claims for damages resulting from 
the work of improvement. Compliance with these 
conditions was completed January 15, 1954, except that 
local interests are required to furnish disposal areas for 
the construction and the subsequent maintenance of the 
proposed improvement. 
Terminal facilities: See Annual Report for 1962. 
Operations during fiscal year: Maintenance, 
contract: Work included Pt. Pleasant bulkhead coating 
and Phase 2, bank stabilization of Cape May South, 
repair bulkhead of fence, field survey of Cape May 
Canal, lease equipment. There was maintenance 
dredging by Barnegat Bay Dredging Company from 24 
March 1987 to 28 September 1987 removing a total of 
250,000 cubic yards of material at a cost of $944,333. 
Maintenance, hired labor: Work included general 
maintenance, BCR update, engineering and design, and 
supervision and administration. 
16. SALEM RIVER, NJ 
Location: This river rises in Salem County, NJ, 
flows through the county westerly 13 miles, thence 
southerly 7 miles to the City of Salem, and thence 
westerly 3 miles , emptying into Delaware River about 
45 miles below Philadelphia, PA. It is joined at Salem by 
Little Salem River, or Fenwick Creek, from the east. 
(See U.S. Coast and Geodetic Survey Chart No. 294.) 
Previous project: The River and Harbor Act of 
July 11, 1870, provided for a survey and the original 
project was adopted by River and Harbor Act of March 3, 
1871, and modified in 1878, and a subsequent project 
adopted by River and Harbor Act of March 2, 1907. For 
further details see page 1784, Annual Report for 1915; 
page 349 of Annual Report for 1924; and page 346 of 
Annual Report for 1938. 
Existing project: This provides for a channel 12 
feet deep at mean low water, 150 feet wide in Delaware 
River across Salem Cove to the mouth, thence 100 feet 
wide to the fixed highway bridge in Little Salem River 
at Salem, 2 1/4 miles above the mouth. It also provides 
for a cutoff to eliminate a large horseshoe bend between 
the mouth and Salem. The total length of the section 
included in the project is about 4 miles. The mean tidal 
range is 5.4 feet. The extreme tidal range is from about 1 
foot below mean low water to about 2 feet above mean 
high water. 
The estimate of cost for new work is $51,825 exclusive 
of amounts expended on previous projects and $51,825 
contributed by local interests. The portion of the project 
comprising the deepening of Little Salem River to 12 
feet is to be restudied and is excluded from the foregoing 
estimate. The estimated cost of this portion revised in 
1953 is $28,000 excluding an equal amount to be 
contributed by local interests. 
The existing project is about 64 percent completed. 
The dredging of the channel from Penns Neck Bridge to 
project dimensions, including the cutoff, was completed 
in 1928. The channel from Penns Neck Bridge to the 
3-10

PHILADELPHIA, PA. DISTRICT 
fixed highway bridge in Little Salem River was dredged 
to a depth of 9 feet under a previous project. The work 
remaining to be done is the deepening of the channel in 
Little Salem River from 9 feet to 12 feet. 
The controlling depths at mean low water were as 
follows: In January 1961, Delaware River to Penns 
Neck Highway Bridge 12.0 feet; and thence in December 
1956 to the fixed highway bridge at Salem, 0.9 feet. 
The existing project was adopted by the River and 
Harbor Act of March 3, 1925 (H.Doc. 110, 68th Cong. 1st 
Sess.). The latest published map is in the document. 
Section 859 of the Water Resources Development Act 
of 1986 authorized a project depth of 20 feet. 
Local cooperation: The existing project required 
local interest contribute 50 percent of the estimated 
costs of new work and that a right-of-way for the 
proposed cutoff shall be conveyed to the United States 
free of cost. The contributions thus far made provided 
the right-of-way for the cutoff and 50 percent of the cost 
of the 12-foot channel up to a point 225 feet above the 
county (Penns Neck) highway bridge, amounting to 
$51,825. 
Terminal facilities: There are 9 wharves on the 
river all at Salem, NJ. Eight wharves are privately 
owned and one is owned by the City. The facilities are 
considered adequate for existing commerce. 
Operations during fiscal year: Maintenance, 
hired labor: Work included environmental monitoring, 
engineering and design, and supervision and 
administration. 
17. SCHUYLKILL RIVER, PA 
Location: Rises in Schuylkill County, PA, flows 
generally southeasterly 150 miles, and empties into 
Delaware River at Philadelphia, PA (See U.S.Coast and 
Geodetic Survey Charts 295 and 280.) 
Previous project: For details see page 325, Annual 
Report for 1932. 
Existing project: This provides for a channel 33 
feet deep and 400 feet wide in Delaware River to the 
mouth and within the river to 29th Street, .75 mile 
above the mouth; thence the same depth and 300 feet 
wide to Passyunk Avenue Bridge, 3.5 miles above the 
mouth; thence 26 feet deep and 300 feet wide to Gibson 
Point, 4.5 miles above the mouth; and thence 22 feet 
deep and 200 feet wide to University Avenue Bridge, 6 
miles above the mouth, including widening at bends. 
The total length of the section included in the project is 
about 6.5 miles. All depths refer to the plane of mean 
low water. The extreme tidal range, due to freshets and 
prolonged heavy winds, is about 14 feet. 
The cost for new work for the completed existing 
project was $2,809,007. Existing project was completed 
in September 1962. For details see Annual Report for 
1962. (See Table 3-A at end of chapter for total costs for 
existing project to Sept. 30, 1987. See Table 3-B at end of 
chapter for acts authorizing existing project.) 
Local cooperation: The River and Harbor Act of 
July 24, 1946, imposed the condition that the City of 
Philadelphia agree to remove 60,000 cubic yards, place 
measurement, of material annually from that portion of 
those portions of the project which the District Engineer 
may designate until such time as adequate municipal 
sewage-treatment works are constructed and placed in 
effective operation. Compliance with this condition has 
been met through the completion of sewage-treatment 
works by the City of Philadelphia. All other 
requirements have been fully complied with. 
Terminal facilities: There are 38 wharves, piers, 
and docks within limits of improvement. Facilities are 
considered adequate for existing commerce. (For further 
details see Port Series No. 7, Revised 1967, Corps of 
Engineers.) 
Operations during fiscal year: Maintenance, 
hired labor: Work included general maintenance, 
environmental monitoring, and engineering and design. 
18. WATERWAY FROM INDIAN 
RIVER INLET TO REHOBOTH 
BAY, DE 
Location: In southeasterly part of Sussex County, 
connects Rehoboth Bay with Indian River Bay by way of 
Big Ditch. (See U.S. Coast and Geodetic Survey Chart 
No. 1219.) 
Previous projects: None 
Existing project: This provides for a channel 6 feet 
deep and 100 feet wide from water of 6-foot depth in 
Rehoboth Bay to water of the same depth in Indian 
River Bay by way of Big Ditch. The total length of the 
section included in the project is about 2.7 miles. The 
mean tidal range in the vicinity of the project in 
Rehoboth Bay is 0.5 foot; in Indian River Bay 0.9 foot. 
The extreme tidal range is from 1.5 feet below mean low 
water to about 2.5 feet above mean high water. Cost for 
new work for completed project was $90,908, exclusive 
of $20,000 contributed by local interests. Existing 
project was adopted by River and Harbor Act Cong., 1st 
Sess.) The latest published map is in the project 
jocument. (See Table 3-A at end of chapter for total 
zosts for existing project to Sept. 30, 1987.) 
Local cooperation: The act authorizing the project 
provides that local interests shall give assurances 
satisfactory to the Secretary of the Army that they will 
3-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
(a) provide without cost to the United States all lands, 
easements, initial work and subsequent maintenance 
when and as required; (b) hold and save the United 
States free from damages due to the construction and 
subsequent maintenance of the project, including such 
damages as may occur to public or leased oyster beds; 
and (c) make a cash contribution of $20,000 toward the 
construction of the project. Assurances of local 
cooperation were approved on February 27, 1956. 
Conditions of local cooperation have been complied with 
expect that local interests are required to furnish 
suitable spoil-disposal areas for subsequent 
maintenance as required. 
Terminal facilities: There are no terminal or 
transfer facilities in the area that are fully open to 
public use. However, existing facilities that are 
available on a limited basis are adequate for the present 
demand, and can be expected to expand to meet future 
needs. 
Operations during fiscal year: Maintenance, 
hired labor: BCR review. 
19. WILMINGTON HARBOR, DE 
Location: Formed by Christina River, which rises 
in New Castle County, DE, flows northeasterly 16 miles, 
passing through the City of Wilmington, DE, and 
empties into Delaware River about 29 miles below 
Philadelphia, PA (See U.S. Coast and Geodetic Survey 
Chart 294.) 
Previous projects: For details see page 1785 of 
Annual Report for 1915 and page 308 of Annual Report 
for 1938. 
Existing project: This provides for a channel 35 
feet deep and 400 feet wide from west edge of Delaware 
River ship channel to Lobdell Canal, a distance of about 
1.2 miles; thence 21 feet deep and 250 feet wide for the 
distance of .8 mile to the mouth of Brandywine River; 
thence the same depth and 200 feet wide for a distance of 
about 2.2 miles to a point approximately 4.2 miles from 
the Delaware River shipchannel; thence decreasing a 
depth of 10 feet in a distance of 750 feet to Penn Central 
Railroad bridge No.4; and thence 7 feet and 100 feet 
wide for a distance of of about 5.6 miles to Newport, DE, 
approximately 9.9 miles above Delaware River ship 
channel, including a turning basin 35 feet deep opposite 
the Wilmington Marine terminal and extending 
upstream from the mouth to Lobdell Canal, 200 feet 
wide, 2,900 feet long on the north side of the channel 
and decreasing to a length of 2,000 feet on the north side 
of the basin. It also provides for the removal of about 
1,200 feet of the outer end of a stone-filled, 
pile-and-timber crib jetty constructed 2,150 feet long on 
the north side of the entrance; for a steel sheet-pile jetty 
2,300 feet long, with 120-foot inshore wing, on the south 
side of the entrance, and for a V-shaped stone-filled 
pile-and-timber jetty at the mouth of Brandywine River 
430 feet along the north side of Brandywine and 260 feet 
long on the Christina. Depths refer to the plane of mean 
low water. The extreme tidal range, due to prolonged 
heavy winds, is about 13 feet. Existing project was 
completed in 1962. (For details see page 222, Annual 
Report 1962.) Authority from Section 107 of the River 
and Harbor Act of July 1960 approved channel and 
turning basin deepened from 35 to 38 feet and the 
turning basin widened from 200 to 320 feet. (See Table 
3-A at end of chapter for total costs for existing project to 
Sept. 30, 1987. See Table 3-B at end of Chapter for Acts 
authorizing existing project.) 
Local cooperation: Fully complied with. 
Terminal facilities: There are 18 piers, wharves, 
and docks within limits of the improvement. Facilities 
considered adequate for existing commerce. (For further 
details see Port Series No.8, revised 1966-Corps of 
Engineers.) 
Operations during fiscal year: Maintenance, 
contract: Work included mixing zone contract, water 
quality and shad monitoring, cultural resource 
investigation, lease of equipment, construction of dikes 
and sluices, construction of disposal area, subsurface 
testing, investigation of sunken vessel, and USGS 
Stream Gaging. There was maintenance dredging by 
American Dredging Company from 25 April 1987 to 17 
June 1987 removing a total of 520,864 cubic yards of 
material at a cost of $494,299. 
Maintenance, hired labor: Work included general 
maintenance, disposal area and dredge monitoring, 
environmental coordination for reef design, 
predeployment for reef, installation and maintenance of 
Stream Gaging by USGS, ditching, engineering and 
design, and supervision and administration. 
Beach Erosion Control: 
20. SHORELINE EROSION 
CONTROL DEMONSTRATION 
Location: Demonstration projects were undertaken 
at a total of 16 sites nationwide, 6 of which are located in 
the Delaware Bay and include Pickering Beach, Kitts 
Hummock, Slaughter Bowers Beach, Broadkill Beach, 
and Lewes, Delaware. The latter three sites were only 
monitored as there are presently Federal and State 
projects in progress. 
Existing project: Section 54 of Water Resources 
Development Act of 1974 authorized a nationwide, 5 
year program to test and evaluate low cost shoreline 
erosion control measures, both structural and 
vegetative, which can be implemented by individual 
private property owners. The emphasis of the program 
was not to solve individual problems, so much as to 
3-12

PHILADELPHIA, PA. DISTRICT 
explore the effectiveness of various ways to control 
erosion at different types of shorelines, and provide this 
information to private and public landowners. The 
construction and evaluation at all sites are completed 
and information dissemination has been started. 
Development and dissemination of public information 
guide books. As such we are the repository of these guide 
books. 
Operations during fiscal year: Maintenance, 
hired labor: Dissemination of reports as requested by 
OCE.
21. BEACH EROSION CONTROL 
WORK UNDER SPECIAL 
AUTHORIZATION 
Beach erosion control activities pursuant to Section 
103, Public Law 87-874 (Preauthorization). 
Name of project Cost to 30 Sep 1987 
Detailed Project Reports 
North Shore-Indian River Inlet 
South Shore-Indian River Inlet 
$ 7,428 
12,308 
Flood Control 
22. BELTZVILLE LAKE, PA 
Location: Damsite is on Pohopoco Creek about 4.5 
miles upstream from its confluence with Lehigh River 
and 4 miles east of Lehighton, PA (See Geological 
Survey Quadrangle Map for Lehighton, PA-1960.) 
Existing project: This is a multiple-purpose 
development project providing water supply, flood 
control, and recreation. Plan of improvement provides 
for an earth and rock fill dam 4,200 feet long rising 170 
feet above creekbed; a spillway around the north end of 
dam; and gate control outlet works discharging through 
a conduit on rock along right abutment. The lake, a unit 
of comprehensive plan for flood control and other 
purposes of Delaware River Basin, has a reservoir 
capacity of 68,250 acre-feet at spillway crest level with 
1,390 acre-feet of inactive storage, 39,830 acre-feet for 
water supply and recreation, and 27,030 acre-feet for 
flood control. The cost of project was $22,931,400 
including $6,100,000 required non-Federal 
reimbursement for costs allocated to water supply 
storage during life of project. The construction of the 
dam and appurtenances was completed in 1971. (See 
Table 3-A at end of chapter for total costs for existing 
project to Sept. 30, 1987.) 
Local cooperation: Project was approved subject to 
certain requirements of cooperation by local interests as 
defined in approved House Document. Resolution of 
Delaware River Basin Commission providing 
assurances of repayment of water supply and pollution 
control costs was accepted June 7, 1965. A contract for 
repayment of water supply costs was signed October 
16,1966. 
Operations during fiscal year: Maintenance, 
contract: Work included recreation safety program, 
USGS Stream Gaging equipment, snow survey 
program, repair and maintenance of specific gages, 
water quality testing and monitoring, bulkhead water 
quality monitoring, monumentation survey, and repair 
outlet channel side slope. 
Maintenance, hired labor: Work included operation 
and maintenance of reservoir, instrumentation and 
surveillance, safety inspection, dam safety training, 
USGS Stream Gaging, installation of WCDS equipment. 
Work also included reservoir regulation data collection, 
water quality testing and monitoring, repair and extend 
drainage ditch, clean trash rack, test and evaluation of 
emergency bulkhead, engineering and design, and 
supervision and administration. 
23. BLUE MARSH LAKE, PA 
Location: Dam site is on Tulpehocken Creek about 
1.5 miles upstream from its confluence with Plum Creek 
and about 6 miles northwest of Reading, PA(See 
Geological Survey Quadrangle Sheet, Bernville, PA) 
Existing project: This is a multiple-purpose 
development project providing water supply, flood 
control, and recreation. Construction started in 1974 
and was completed in 1980. The dam is 1,775 feet long 
and rises 98 feet above creekbed, with spillway about 
1,500 feet south of dam, and gate-controlled outlet 
works discharging through a conduit on rock along right 
abutment. The lake, a unit of comprehensive plan for 
flood control and other purposes of Delaware River 
Basin, has a capacity of 50,010 acre-feet at spillway 
crest level, with 3,000 acre-feet of inactive storage, 
14,620 acre-feet for water supply and recreation, and 
32,390 acre-feet for flood control.(For details see H.Doc 
533 87th Cong., 2nd Sess.) Cost of project $63,163,791. 
Existing project was authorized by 1962 Flood Control 
Act. (See Table 3-A at end of chapter for total costs for 
existing project to Sept. 30, 1987.) (H. Doc. 533, 87th 
Cong., 2d Sess., contains latest published maps.) 
Local cooperation: Project was approved subject to 
certain requirements by local interests, as prescribed in 
House Document cited above. Delaware River Basin 
Commission on December 29, 1964, adopted a 
preliminary resolution providing for repayment of water 
supply costs. 
Operations during fiscal year: Maintenance, 
contract: Work included maintenance, recreation 
safety program, sewage treatment plant, drill well for 
recreation area, sewage vacuum system, USGS Stream 
3-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Gaging, snow survey and NOAA Weather Service 
Cooperation. Work also included maintenance and 
repair of specific gages, water quality testing and 
monitoring, installation of computer terminal and 
peripherals, lawn maintenance, janitorial services, 
trash removal, replacements of piezometers, purchase 
and repair of water equipment, and cost incurred for 
Lower Heidelberg Township police department. 
Maintenance, hired labor: Work included operation 
and maintenance of reservoir and recreation area, 
annual safety inspection, instrumentation and 
surveillance, installation of WCDS equipment, reservoir 
regulation data collection, water quality testing and 
monitoring. There was joint use of water facilities, 
erosion control, repair access road, plans and 
specifications on treatment plant roof, engineering and 
design, and supervision and administration. Also 
incurred were costs for seasonal employment at 
recreation area. 
24. DELAWARE COAST 
PROTECTION, DE 
Location: The project is located in Sussex County, 
Delaware, on the Atlantic Ocean and starts 
immediately south of Delaware Bay extending in a 
southerly direction a distance of 24.5 miles to Fenwick 
Island on the Delaware-Maryland border. 
Previous Project: The previous project, adopted as 
HD 85-216 in 1958 and modified by P.L. 87-874 in 1962, 
provided for Federal participation in the cost of 
restoration and subsequent periodic nourishment, and 
the initial periodic nourishment was completed in 1957 
by local interests. The second increment of beach 
replenishment by local interest was completed in 1963. 
Existing project: Provides a plan of improvement 
which consists of the construction of dunes and beach 
fill; the construction of bulkheads at Rehoboth and 
Dewey beaches; periodic nourishment of the beaches; 
placement of sand fences; planting dune grass; and 
maintenance' and replacement of existing 
structures.(For details, see S. Doc. 90, 90th Cong. 2d 
Sess.) Estimated cost of project (October 1985) 
$11,600,000 includes $2,700,000 required non-Federal 
costs. The construction of the feeder beach north of 
Indian River Inlet was completed in 1973 and nourished 
in 1978, and 1984. Other work undertaken has been 
engineering and design associated for the remaining 
portion of the project. (See Table 3-A at end of chapter 
for total costs for existing project to Sept. 30, 1987.) 
Local cooperation: Assurances of local cooperation 
were provided by the State of Delaware, January 13, 
1981. 
Operations during fiscal year: New work, 
contract: Work included subsurface testing. 
New work, hired labor: Work included planning 
management and engineering and design. 
25. FLOOD CONTROL WORK 
UNDER SPECIAL 
AUTHORIZATION 
Flood control activities pursuant to Section 205, 
Public Law 838, 80th Congress, as amended 
(Preauthorization). 
Name of Project Cost to 30 Sept. 1987 
Reconnaissance Reports 
Palmerton, PA 
Plans and Specifications 
Delaware River, Port Jervis, NY 
Pennypack Creek, Hatboro, PA 
Construction 
Poquessing Creek, Bucks Co. PA 
$ 21,097 
$ 91,552 
$ 1,164 
$507,279 
Emergency flood control activities-repair, flood 
fighting, and rescue work (Public Law 99, 84th 
Congress, and antecedent legislation). 
Fiscal year costs were $ 177,448 for disaster 
preparedness. 
26. EMERGENCY BANK 
PROTECTION 
Emergency Bank Protection Section 14, 
79-526. 
Darby Creek-Lansdowne Borough, PA 
Construction 
Delaware River, Ft. Mifflin, PA 
Reconnaissance Report 
Plans & Specifications 
Perkiomen Creek - Berks County, PA 
Construction 
Ridley Creek - Philadelphia, PA 
Reconnaissance Report 
Plans & Specifications 
Public Law 
$117,522 
7,500 
37,242 
40,519 
7,500 
31,288 
27. FRANCIS E. WALTER DAM, 
PA 
Location: Reservoir is in northeastern Pennsylvania 
on Lehigh River between White Haven and 
Stoddartsville. Dam is about 0.4 mile below mouth of 
Bear Creek, about 60 miles above confluence of Lehigh 
River and Delaware River at Easton, PA(See Geological 
Survey Quadrangle Sheet, Stoddartsville, PA) 
3-14

PHILADELPHIA, PA. DISTRICT 
Existing project: Plan of improvement authorized 
by 1946 Flood Control Act (H. Doc 587,79th Cong.,2d 
Sess.) provided for a single-purpose flood control 
reservoir. Modification of project, authorized by 1962 
Flood Control Act (H. Doc.522,87th Cong., 2d Sess.), 
provides for a multiple-purpose development for water 
supply and recreation in addition to present 
single-purpose flood control project. Plan of 
improvement requires altering spillway, increasing 
height of dam, extending outlet tunnel by addition of a 
concrete conduit, and constructing new dikes and 
raising existing dikes. Modified dam will rise 263 feet 
above riverbed and be 3,500 feet long. Reservoir 
modification, a unit of comprehensive plan for flood 
control and other purposes of Delaware River Basin, will 
have a reservoir capacity of 180,000 acre-feet spillway 
crest level with 2,000 acre-feet of inactive storage, 
70,000 acre-feet for water supply and recreation and 
108,000 acre-feet for flood control. Estimated Federal 
cost of new work (October 1985) is $14,700,000 
including $100,300,000 required non-Federal 
reimbursement for costs allocated to water supply 
storage during life of project after use of this storage is 
initiated. Project as authorized under the 1946 Flood 
Control Act was completed June 1961. Settlement for 
lands was completed October 1962. The advance 
engineering and design for the modified project is now 
underway. (See Table 3-A at end of chapter for total 
costs for existing project to Sept. 30, 1987.) 
Local cooperation: None required under 1946 
Flood Control Act. Under 1962 Flood Control Act, 
project was approved subject to certain requirements by 
local interests, as defined in House Document 522 cited 
above. The Delaware River Basin Commission 
reiterated its sponsorship for the modified project in 
August 1982. 
Operations during fiscal year: Maintenance, 
contract: Work included general maintenance, 
analysis mapping, USGS Stream Gaging and snow 
surveys, NOAA Weather Service, water quality testing 
and monitoring, and monumentation of surveys. 
Maintenance, hired labor: Work included operation 
and maintenance of reservoir and recreation facilities, 
instrumentation and surveillance of reservoir, safety 
inspection, initial reservoir filling plan, emergency 
planning, USGS Cooperative Stream Gaging, 
installation of WCDS equipment, reservoir regulation 
data collection, water quality testing and monitoring, 
engineering and design, and supervision and 
administration. 
28. GENERAL EDGAR JADWIN 
DAM AND RESERVOIR, PA 
Location: In Dyberry Creek valley in central part of 
Wayne County, PA, between borough of Honesdale and 
village of Tanners Falls. Dam is about 3 miles above 
confluence of Dyberry Creek and'Lackawaxen River in 
Honesdale and 29 miles above confluence of 
Lackawaxen and Delaware Rivers. (See Geological 
Survey Quadrangle Sheet, Honesdale, PA) 
Existing project: A single-purpose flood control 
reservoir with a capacity of 24,500 acre-feet formed by 
an earth embankment, about 1,225 feet long at crest and 
rising 109 feet above creek bed. It also has a tunnel with 
intake structure and a chute-type spillway with a 
stilling basin in left abutment. Reservoir controls runoff 
from a drainage area of 65 square miles which is 91 
percent of watershed of Dyberry Creek and 39 percent of 
Lackawaxen River watershed above Honesdale, PA. 
Construction of project was authorized by 1948 Flood 
Control Act (H.Doc. 113, 80th Cong., 1st Sess.). Federal 
cost of new work was $ 4,064,510. Non-Federal funds not 
required. Project completed in June 1960. 
Local cooperation: Assurances of Compliance with 
requirements of local cooperation were accepted July 30, 
1956. For details see page 251, Annual Report for 1962. 
Operations during fiscal year: Maintenance, 
contract: Work included instrumentation survey, 
USGS Stream Gaging, NOAA Weather Service, repair 
specific gages, and water control data equipment. 
Maintenance, hired labor: Work included operation 
and maintenance of the reservoir, instrumentation and 
surveillance, safety inspection, dam safety plan, 
inundation mapping, dam break analysis, safety 
training, water quality and data collection, reservoir 
regulation data collection, cut and reshape ditches, 
supervision and administration, and engineering and 
design. 
29. INSPECTION OF 
COMPLETED FLOOD 
CONTROL PROJECTS 
To ascertain whether local interests were 
maintaining and operating completed projects as 
required, inspections were made as follows: 
PROJECT INSPECTION 
DATES 
Lehigh River at Allentown, PA 6 November 1986 
19 May 1987 
Lehigh River at Bethlehem, PA 13 November 1986 
27 May 1987 
Delaware River at East Branch, NY 5 November 1986 
15 May 1987 
Rancocas Creek at Mount Holly, NJ 14 November 1986 
26 May 1987 
Chester River at Chester, PA 10 November 1986 
15 May 1987 
Beach Erosion & 
Hurricane Protection 23 & 25 September 1987 
3-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Local interests are satisfactorily maintaining and 
operating projects in accordance with regulation. Costs 
during the period were $9,555. Total costs were 
$114,437. 
30. INSPECTION OF 
NON-FEDERAL LEVEES 
Inspection of non-Federal levees was conducted at a 
cost of $2,233 at the following site: 
Stroudsburg, East Stroudsburg, PA 
Hawley, PA 
2 June 1987 
3 June 1987 
31. PROMPTON LAKE, PA. 
Location: In Lackawaxen River Valley in central 
part of Wayne County, PA, between borough of 
Prompton and village of Aldenville. Dam is within 
corporate limits of Prompton, 4 miles upstream from 
Honesdale, PA, and approximately 30 miles "above 
confluence of Lackawaxen and Delaware River. (See 
Geological Survey Quadrangle Sheet, Honesdale, PA) 
Existing project: Plan of improvement authorized 
by 1948 Flood Control Act (H. Doc. 113, 80th Cong., 1st 
Sess.) provides for a single-purpose flood control 
reservoir. Modification of project authorized by 1962 
Flood Control Act (H.Doc 522, 87th Cong., 2d Sess.) 
provides for a multiple-purpose development for water 
supply and recreation in addition to present 
single-purpose flood control project. Plan of 
improvement requires construction of control tower 
with gates and service bridge, placing an impervious 
blanket on valley walls and floor upstream from dam, 
widening spillway, and clearing land and relocating 
roads in reservoir. Dam, completed under 1948 Flood 
Control act which will not be modified, is 1,230 feet long 
and rises 140 feet above riverbed. Existing spillway, cut 
into rock of right abutment, will be modified and present 
uncontrolled outlet works discharging into a concrete 
conduit along right bank, and will be provided with 
gates and a control tower. Reservoir modification, a unit 
of comprehensive plan for flood control and other 
purposes of Delaware River basin has a capacity of 
52,000 acre-feet: 3,500 acre-feet for inactive storage, 
28,200 acre-feet for water supply and recreation, and 
20,300 acre-feet for flood control. Estimated Federal cost 
of new work (October 1985) is $43,300,000 including 
$5,200,000 required non-Federal reimbursement for 
costs allocated to water supply storage during life of 
project after use of this storage is initiated. Project as 
authorized under the 1948 Flood Control Act was 
completed in November 1960. (For details, see page 358, 
Annual Report for 1963.) Work accomplished under the 
1962 Flood Control Act was advanced engineering and 
design. 
Local cooperation: Prbject modification was 
approved subject to certain requirements by local 
interests, as defined in House Document 522 cited 
above. Assurances of compliance under Flood Control 
Act of 1948 have been met. Delaware River Basin 
Commission on March 18, 1966, gave their view that the 
need for water supply was not urgent at that time. 
However recent studies conducted by DRBC have 
determined that there is now a need for water supply. In 
August 1983, DRBC expressed their strong support for 
the project modification.: Preconstruction planning has 
resumed 
Operations during fiscal year: Maintenance, 
contract: Work included instrumentation survey, 
USGS Cooperative Stream Gaging, NOAA Weather 
Service, repair and maintenance of specific gages, water 
quality monitoring and testing, and installation of 
seismograph. 
Maintenance, hired labor: Work included operation 
and maintenance of reservoir, instrumentation and 
surveillance, periodic inspection, dam safety training, 
disposal area break analysis, reservoir regulation data 
collection, water quality monitoring and testing, cut and 
reshape ditch, engineering and design, and supervision 
and administration. 
32. RECONNAISSANCE AND 
CONDITION SURVEYS 
Project 
Murderkill 
Mispillion 
Salem River 
L & R Canal 
Date Survey Conducted 
15 April 1987 
14-17 April 1987 
18 February 1987 
22 September 1987 (Partial) 
24 June 1987 
33. NATIONAL EMERGENCY 
PREPAREDNESS 
The total fiscal year cost for this category amounted to 
$117,822. 
GENERAL INVESTIGATIONS 
34. SURVEYS 
Cost for the period were $906,053 for navigation 
studies; $149,716 for flood control studies: $1,154,110 
for special studies: a total of $2,209,879. 
35. COLLECTION AND STUDY 
OF BASIC DATA 
Cost and expenditures during the period for flood 
plain information studies were $202,237. 
3-16

PHILADELPHIA, PA. DISTRICT 
TABLE 3-A COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Projects Funding FY84 FY85 FY86 FY87 SEPT. 30, 1987 
1. Barnegat Inlet, 
NJ 
(Regular 
Funds) 
(Contributed 
Funds) 
2. Cape May Inlet 
to Lower Twp., NJ 
3. Cohansey River, 
NJ 
(Regular 
Funds) 
4. Cold Spring Inlet, 
NJ 
(Regular 
Funds) 
(Contributed 
Funds) 
5. Delaware River 
Between Philadelphia, 
PA and 
Trenton, NJ 
(Regular 
Funds) 
(Contributed 
Funds) 
6. Delaware River 
PA, NJ and DE 
Philadelphia 
to the Sea 
(Regular 
Funds)* 
7. Delaware River 
Vicinity of Camden, 
NJ (Regular 
Funds)* 
(Contributed Funds) 
8. Indian River 
Inlet and Bay, 
DE 
(Regular 
Funds) 
(Contributed 
Funds) 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
210,000 
206,975 
670,000 
694,337 
(3,000) 
15,951 
112,000 
112,554 
298,125 
298,476 
15,000 
3,022 
289,000 
286,860 
66,000 
65,367 
(1000) 
(1,385) 
3,328,000 
3,321,857 
110,000 
61,094 
515,000 
509,472 
1,434,000 
1,424,916 
266,000 
264,703 
3,005,000 
3,009,484 
4,425,000 
1,442,663 
619,000 
624,227 
1,992,000 
226,659 
150,000 
130,150 
132,000 
137,808 
158,000 
151,386 
261,000 
260,475 
5,208,849 
2,162,603 
11,144,135 
11,141,552 
2,292,000 
526,659 
300,000 
280,150 
146,75620 
146,75620 
2,404,931 
2,401,022 
879,275 
879,275 
2,814,507 
2,806,210 
1,134,346 
1,134,346 
150,000 8 
150,0008 
72,147,8001 
72,147,8001 
33,102,8602 
33,100,6742 
15,000 
15,000 
57,879,8723 
57,879,8723 
21,533,300 25,051,286 14,309,000 14,655,000 338,599,1684 
21,639,766 25,051,908 14,287,846 14,662,843 338,567,6484 
- - - 508,324 
- - - 508,324 
- - - 1,610,000 2,074,906's 
- - - 1,173,708 1,638,6141s 
- - - 362,962 
- - - 362,799 
- - - 970,000 985,000 
- - - 708,330 723,330 
- - - 511,2106 
- - - 511,210 
4,000 22,000 64,000 30,000 2857923 
4,171 20,617 65,196 30,145 2,857,881 
- - - 1,323,775 
- - - 1,323,775 
- - - 210,000 
- - - 210,000 
3-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 3-A (continued) COSTAND FINANCIAL STATEMENT 
See 
Section 
in Text Projects Funding FY84 FY85 FY86 FY87 SEPT. 30, 1987 
9. Inland Waterway New Work 
Rehoboth Bay 
to Delaware 
Bay, DE 
(Regular 
Funds) 
(Contributed 
Funds) 
10. Inland Waterway 
from Delaware 
River to Chesapeake 
Bay, DE 
and MD 
(Regular Funds) 
11. Maurice River, NJ 
(Regular Funds)* 
12. Mispillion 
River, DE 
(Regular 
Funds) 
13. Murderkill 
River, DE 
(Regular 
funds) 
14. New Jersey 
Intracoastal 
Waterway 
(Regular 
Funds) 
(Contributed 
Funds) 
15. Salem River, NJ 
(Regular Funds) 
(Contributed 
Funds) 
16. Schuylkill 
River, PA 
(Regular 
Funds) 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
30,000 
32,572 
19,000 
16,346 
208,000 
208,523 
335,800 
338,986 
10,488,275 12,068,000 11,129,053 21,925,400 
10,666,460 11,940,091 11,295,557 21,846,350 
- - - 15,000 
- - - 14,943 
11,000 
11,000 
159,000. 
160,280 
1,121,000 
1,152,487 
1,241,000 
1,244,884 
7,500 
7,500 
111,000 
110,600 
979,000 
981,788 
1,693,000 
1,641,466 
211,000 
210,107 
153,000 
149,713 
2,563,300 
2,560,237 
125,000 
125,433 
37,000 
34,758 
253,491 
41,000 
43,653 
2,533,000 
2,478,900 
40,000 
36,000 
104,000 
97,895 
561,514 
561514 
1,867,778 
1,868,833 
60,000 
60,000 
132,535,5926 
132,532,6006 
181,490,1607 
181,365,7127 
6,095,000 
6,065,412 
143,98416 
143,98416 
162,050 
161,993 
385,34817 
385,34817 
1,618,566 
1,608,094 
253,491 
37,630 
37,630 
1,309,355 
1,308,720 
71,5499 
71,5499 
24,678,87210 
24,621,48010 
1,196,581 
1,196,581 
99,000 
99,000 
107,63419 
107,634 
1,403,00422 
1,398,78922 
51,825 
51,825 
3,334,00711 
3,334,00711 
2,6171,034 
26,164,714 
3-18

PHILADELPHIA, PA. DISTRICT 
TABLE 3-A (continued) COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Projects Funding FY84 FY85 FY86 FY87 SEPT. 30, 1987 
17. Waterway from New Work 
Indian River Inlet Approp. - - - 90,908 
to Rehoboth Bay, Cost - - - 90,908 
DE (Regular Maint. 
Funds) Approp. - - - 18,000 265,497 
Cost - - - 12,336 253,833 
18. Wilmington New Work 
Harbor, DE Approp. - - - 1,954,72512 
(Regular Cost - - - 1,954,72512 
Funds) Maint. 
Approp. 2,006,000 3,226,600 4,207,700 13,826,200 48,831,664 
Cost 2,069,777 3,215,739 4,217,572 13,768,314 48,765,444 
(Contributed New Work 
Funds) Approp. - - - 60,000 
Cost - - - 60,000 
19. Beltzville Lake, New Work 
PA Approp. - - - 100 22,931,932 
(Regular Cost - - - 700 22,931,830 
Funds) Maint 
Approp. 655,800 521,000 515,000 617,500 5,935,675 
Cost 713,170 521,407 496,875 635,506 5,933,770 
20. Blue Marsh New Work 
Lake, PA Approp. - - - 63,180,300 
(Regular Cost 3,212 5,479 (1551) (1730) 63,165,988 
Funds) Maint. 
Approp. 1,002,200 1,186,000 1,053,000 1,106,322 7,668,522 
Cost 1,068,725 1,167,543 1,058,095 1,122,178 7,644,812 
21. Delaware Coast New Work 
Protection Approp 775,000 200,000 550,000 3,003,95321 
(Regular Funds) Cost 455,165 120,542 148,701 9,080 2,205,97221 
Maint. 
Approp. 88,000 - - 215,350 
Cost 88,000 - - 215,350 
(Contributed Funds) New Work 
Approp. (921) - - 1,033,473 
Cost 11,538 614,809 1,052 1,033,473 
22. Francis E. New Work 
Walter Dam, PA Approp. - - - 11,503,432's13 
(Regular Cost - 1,460 - 11,503,43213 
Funds) Maint. 
Approp. 383,700 422,000 460,000 474,500 5,468,021 
Cost 388,882 421,975 449,970 465,297 5,437,920 
* Total Adjusted to correct discrepancies in prior years. 
** For Construction, General funds only on legislative Phase I 
AE&D, or support work for Phase II AE&D. 
1. Includes $2,489,173 for new work for previous projects, $105,000 
for preauthorization studies and minus $142,015 adjustment 
(new work) to Delaware River, Philadelphia to Sea project from 
this project under 1954 modification. 
2. Included $552,720 for maintenance for previous projects, and 
$685,000 Jobs Bill Funds. 
3. Excludes $12,976,054 for new work for previous projects and 
$142,015 adjustment from Delaware River, Philadelphia to 
Trenton, NJ under 1954 modification. 
4. Includes $1,025,409 for maintenance of previous projects, and 
$8,000 Jobs Bill funds. 
5. Excludes $10,000 for previous project. 
6. Includes $10,709,755 for new work for previous projects. 
7. Includes $6,903,748 for maintenance for previous projects, and 
$9,500 Jobs Bill funds. 
8. Includes $50,000 Navy Department Funds. 
9. Excludes $1,824,940 Navy Department Funds. 
10. Excludes $286,953 Navy Department funds expended for 
maintenance. 
11. Includes $525,000 for previous projects. 
12. Includes $402,121 for new work for previous project, and 
$206,177 emergency relief funds. 
13. Includes $40,000 appropriated and expended under Code 710 
Recreation Facilities. 
14. Includes $63,000 appropriated and $61,551 expended under Code 
710 Recreation Facilities, excludes $23,600 preauthorization 
studies under 1948 modification. 
15. Excludes $219,500 expenditures under AE&D. 
16. Incl. $43,000 New Work funds expended on previous projects. 
17. Includes $148,798 for new work on previous projects. 
18. Includes $61,172 for maintenance on previous projects. 
19. Includes $55,809 for new work funds expended on previous 
project. 
20. Includes $36,000 for new work for previous projects. 
21. Includes $704,000 AE&D. 
22. Includes $1,285 for reconnaissance and condition survey in fiscal 
year 1957, $1,792 operation and maintenance cost incurred for 
preparation of environmental impact statement, and $48,000 
expended for maintenance on previous project. 
3-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 3-A (continued) COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Projects Funding FY84 FY85 FY86 FY87 SEPT. 30, 1987 
23. General Edgar New Work 
Jadwin Dam and Approp. - - - 4,073,105 
Resevoir, PA Cost - - - 4,073,105 
(Regular Maint. 
Funds) Approp. 74,200 243,000 222,000 155,500 1,768,064 
Cost 88,156 242,742 210,796 156,995 1,758,027 
24. Prompton Lake New Work 
PA Approp. - - - 4,609,48314 
Cost - - - 4,609,48314 
Maint. 
Approp. 298,000 353,000 287,000 296,000 2,996,162 
Cost 306,608 348,359 295,841 282,282 2,980,006 
TABLE 3-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug 30, 1935 
Aug 26, 1937 
July 24, 1946 
July 2, 1985 
Nov 17, 1986 
Mar 2, 1907 
Aug 26, 1937 
Mar 2, 1907 
Mar 2, 1945 
July 3, 1930 
BARNEGAT INLET, NJ (See Section 1 of Text) 
An 8-foot depth through inlet to Oyster Creek 
Channel across inner bar, 10-foot depth through 
outer bar and for jetties. 
A channel of suitable hydraulic characteristics from 
gorge to Oyster Creek Channel, and thence to deep 
water in bay. 
Maintenance dredging of channel to connect main inlet 
channel with Barnegat City Harbor. 
Construction of a parallel, 4270 foot rubble mound 
south jetty and dredging a channel 10 feet deep, 300 
feet wide, and 11,300 feet long. 
CAPE MAY INLET TO LOWER TOWNSHIP, NJ 
(See Section 2 of Text) 
Consists of beach fill; dune fill; new groins; maintenance 
of existing groins; rehabilitation of an 
existing seawall; and a breakwater with weir and 
deposition basin at Cape May Inlet. 
Project may be constructed separately or in combination 
with any other feature of the project. 
COHANSEY RIVER, NJ (See Section 3 of Text) 
Channel 7 feet deep over entire project. 
Channel 12 feet deep to Glass Street, thence 8 feet 
to Commerce Street with turning basin. 
COLD SPRING INLET, NJ (See Section 4 of Text) 
An inlet channel 25 feet deep and jetties. 
A 20-foot channel to deep water in harbor 
DELAWARE RIVER BETWEEN PHILADELPHIA, PA AND 
TRENTON, NJ (See Section 5 of Text) 
A channel 28 feet deep, 300 feet wide between 
Allegheny Ave., Philadelphia, PA and Delair Bridge 
Rivers and Harbors 
Committee Doc. 19, 
73d Con.,2d sess.1 
Rivers and Harbors 
Committee Doc. 85, 
74th Con.,2d sess.1 
H. Doc.358, 79th Cong 
2d sess. 
H. Doc.236, 99th Cong 
2d sess. 
Rivers & Harbors 
Act of 1968 
WRDA of 1986 
H. Doc.645, 59th Cong 
1st sess. 
Senate Committee print, 
75th Cong., 1st sess. 
H. Doc.388, 59th Cong 
2nd sess. 
H. Doc.262, 77th Cong 
1st sess. 
Rivers and Harbors 
Committee Doc. 3, 
71st Cong., 1st sess. 
3-20

PHILADELPHIA, PA. DISTRICT 
TABLE 3-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug 30, 1935 
Aug 30, 19352 
Aug 26, 1937 
July 24, 1946 
Sept 3, 1954 
June 25, 1910 
July 3, 1930 
Aug 30, 19353 
June 20, 19384 
Mar 2, 19455 
Mar 2, 19455 
Mar 2, 19455 
Sept. 3, 1954 
July 3, 1958 
Mar 2, 1945 
Channel 25 feet deep from Delair Bridge to Trenton, 
NJ, and maintenance of 12-foot channel from upper 
end of 25-foot project to Penn Central R.R. Bridge 
at Ferry St., Trenton. 
Auxiliary channel, 20 feet deep east of Burlington 
Island. 
A cross channel 8 feet deep, opposite Delanco, NJ 
Anchorage at mouth of Biles Creek 
A channel 40 feet deep and 400 feet wide between 
Allegheny Ave., Philadelphia, PA, and upstream end 
of Newbold Island, thence 35 feet deep to Trenton 
Marine Terminal and turning basin to 800 feet wide. 
Relocate channel at railroad bridge at Delair and 
suitably reconstruct bridge. Construct necessary 
bank protection works; and eliminate authorized 
anchorage near mouth of Biles Creek, PA 
DELAWARE RIVER, PA, NJ, AND DE, PHILADELPHIA 
TO THE SEA (See Section 6 of Text) 
Channel 35 feet deep from Allegheny Ave., 
Philadelphia, PA to Delaware Bay. 
Anchorages 35 feet deep at Port Richmond and Mantua 
Creek, a 30 foot anchorage at Gloucester, NJ and 
extend 1,000 foot channel in Philadelphia Harbor to 
Horseshoe Bend. 
An anchorage 35 feet deep at Marcus Hook, PA 
A channel 37 feet deep from Philadelphia - Camden 
Bridge to Navy Yard, thence 40 feet deep to deep 
water in Delaware Bay. 
A 37-foot depth channel from Allegheny Ave., 
Philadelphia, PA to Philadelphia-Camden Bridge 
A 37-foot depth in an enlargement of anchorage near 
Mantua Creek and Marcus Hook. 
Maintain enlarged channel opposite Philadelphia 
Navy Yard. 
A channel from Allegheny Ave., to Naval Base 40 feet 
deep, 400 feet wide along west side of channel 
through Philadelphia Harbor and 500 feet wide through 
Horseshoe Bend. 
Anchorages at Reedy Point, Deepwater Point, Marcus 
Hook, and Mantua Creek 40 feet deep and 2,300 feet 
wide with mean lengths of 8,000, 5,200, 13,650 and 
11,500 feet respectively. 
DELAWARE RIVER IN VICINITY OF CAMDEN, NJ 
(See Section 7 of Text) 
Located in Camden, NJ on east bank of Delaware River 
directly opposite City of Philadelphia, PA. Project 
will permit ready access and egress of deep draft 
vessels transporting general cargo and coal exports 
to and from Beckett Street Terminal. 
Rivers and Harbors 
Committee Doc. 11, 
73d Cong., 1st sess. 
Rivers and Harbors 
Committee Doc. 66, 
74th Cong., 1st sess 1 
Rivers and Harbors 
Committee Doc. 90, 
74th Cong.,2d sess. 
H. Doc. 679, 79th 
Cong., 2d sess. 
H. Doc. 358, 83d 
Cong., 2d sess. 
H. Doc. 733, 61st Cong. 
2d sess. 
H. Doc. 304, 71st Cong. 
2d sess.' 
Rivers and Harbors 
Committee Doc.5, 73d 
Cong., 1st sess. 
S. Doc. 159, 75th Cong. 
3d sess. 
H. Doc. 580, 76th Cong. 
1st sess. 
H. Doc. 340, 77th Cong. 
1st sess.1 
Specified in Act. 
H.Doc. 358, 83rd Cong. 
2d sess.' 
H. Doc. 185, 85th Cong. 
1st sess. 
74th Cong., 1st sess.1 
H. Doc 353, 77th Cong. 
1st, Sess. 
3-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 3-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug 26, 1937 
Mar 2, 1945 
July 25, 1912 
Aug 30, 1935 
Mar 2, 1945 
Aug 30, 1935 
Aug 7, 1939 
Sept 3, 1954 
Aug 30, 1935 
Mar 2, 1919 
Aug 26, 1937 
Sep 3, 1954 
July 13, 1982 
A channel 9 feet deep, 80 feet wide from like 
depth in Delaware Bay to the landward end of the 
jetties and thence 60 feet wide to Milford, 
including 3 cutoffs, with a turning basin at Milford. 
MURDERKILL RIVER, DE (See Section 13 of Text) 
A channel 7 feet deep at low water from Frederica 
to the 7 foot curve in Delaware Bay, 80 feet wide 
down to the mouth, and 150 feet wide at bottom and 
250 feet wide at top from the mouth to the 7 foot 
curve in the bay. Embankment of dredged material 
on each side to a height of at least 2 feet above 
high spring tides. 
INDIAN RIVER INLET AND BAY, DE (See Section 8 of text) 
A 15-foot inlet channel, steel and stone jetties, 
6 foot channel from end of inlet channel to deep 
water in the bay and authority to modify interior 
inlet channel. 
A 9-foot channel from inlet to Old Landing, including 
basin, and 4-foot channel to highway bridge at 
Millsboro. 
INLAND WATERWAY, REHOBOTH BAY TO DELAWARE BAY, DE 
(See Section 9 of text) 
For a 6-foot depth canal to connect Rehoboth Bay and 
Delaware Bay. 
For a 6-foot depth entrance near Lewes, for jetties, 
for widening the canal from Broadkill River to 
Lewes and basin. 
For a 10-foot depth from Delaware Bay to Lewes and 
in basin, and for extending jetties.6 
INLAND WATERWAY FROM DELAWARE RIVER TO 
CHESAPEAKE BAY, DE & MD (See Section 10 of Text) 
A sea level channel 27 feet deep, 250 feet wide from 
Delaware River to Elk River and 400 feet wide down 
Elk River and Chesapeake Bay to deep water at or 
near Pooles Island; alter existing bridges over 
canal; enlarge Delaware City Branch Channel to 8 
feet deep and 50 feet wide, with a basin same depth 
and revetment of both banks east of Fifth Street; 
enlarge anchorage and mooring basin in Back Creek to 
400 feet wide, 1,000 feet long and 12 feet deep; 
extend jetties at Reedy Point; and construct bulkheads. 
Construct a 4-lane high-level fixed highway bridge 
at or near St. Georges. 
A channel 35 feet deep and 450 feet wide from 
Delaware River through Elk River and Chesapeake 
For an 8-foot depth and width increased to 150 feet 
in Delaware Bay. 
MISPILLION RIVER, DE (See Section 12 of Text) 
A 6-foot depth and extension of south jetty. 
Extension of north jetty. 
3-22 
Rivers and Harbors 
Committee Doc. 41, 
75th Cong. 1st sess. 
H. Doc. 330, 76th 
Cong., 1st sess.' 
H. Doc. 823, 60th Cong., 
1st sess. and Rivers 
and Harbors 
Committee Doc. 51, 
61st Cong., 3d sess. 
Rivers and Harbors 
Committee Doc. 56, 
75th Cong., 2st sess.' 
H. Doc. 344, 77th Cong., 
1st sess.1 
H. Doc. 201, 72d Cong., 
1st sess. and Rivers 
and Harbors 
Committee Docs. 18 
and 24, 736 Cong., 
2d sess. 
Public Law 310, 76th 
Cong., 1st sess. 
S. Doc. 123, 83d Cong. 
2d sess. 
H.Doc.275, 73d Cong. 
2d sess.1. 
H. Doc. 678, 62d Cong. 
2d sess. 
Rivers and Harbors 
Committee, Doc. 83 
74th Cong., 2d sessi 
S. Doc 229, 81st Cong., 
2d sess' 
H.Ex.Doc 21, 52d Cong., 
1st Sess. (See page 981 
Annual Report of 1892.)

PHILADELPHIA, PA. DISTRICT 
TABLE 3-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 1, 1954 
Nov 17, 1986 
July 3, 1930 
Aug 30, 1935 
Nov 17, 1986 
Aug 8, 1917 
July 3, 1930 
July 24, 1946 
NEW JRSEY INTRACOASTAL WATERWAY 
(See Section 15 of text) 
A channel 12 feet deep at mean low water and 
generally 100 feet wide, extending from the Atlantic 
Ocean at Manasquan Inlet, NJ, to Delaware Bay above 
Cape May, NJ. Construction of a canal of similar 
dimensions from Cape May Harbor to Delaware Bay via 
the New England Creek basin, with adequate jetties at 
the Delaware Bay entrance. 
To increase the depth of the 2,000 foot reach of the 
Waterway in Cape May County to 15 feet. 
SALEM RIVER, NJ (See Section 16 of Text) 
A channel of 10-foot depth from Delaware River 
Masters Sand Plant 
Extension of project to Clements Bridge. 
A channel of 20-foot depth 
SCHUYLKILL RIVER, PA (See Section 17 of Text) 
Depths of 35 feet from mouth to Girard Point 
thence 30 feet, 26, and 22 feet to University 
Avenue Bridge, Philadelphia. 
A depth of 30 feet instead of 35 feet between the 
mouth and the conditional restoration and 
maintenance of the channel below Passyunk Ave., 
by the United States. 
H.Doc 133, 76th Cong., 
1st Sess. 
Rivers and Harbors 
Committee Doc. 525 
79th Cong., 2d sess. 
WRDA of 1986 
H.Doc 217, 70th Cong. 
1st Sess.1 
Rivers and Harbors 
Committee Doc. 15 
73d Cong., 1st sess.' 
WRDA of 1986 
H. Doc. 1270, 64th 
Cong., 1st sess. 
Rivers and Harbors 
Committee Doc. 40, 
71st Cong., 2d sess 1 
A depth of 33 feet from the channel in Delaware H. Doc. 699, 79th Cong., 
River to Passyunk Ave., restoration of the project 2d sessi 
channel dimensions between Passyunk Ave., and 
University Ave., and full maintenance of the entire 
project. 
May 17, 1950 
June 3, 1896 
July 25, 1912 
Sep 22, 1922 
July 3, 1930 
July 1960 
WATERWAY FROM INDIAN RIVER INLET 
TO REHOBOTH BAY, DE (Section 18 of Text) 
Provides for a channel 6 feet deep and 100 feet wide 
from water of 6-foot depth in Rehoboth Bay to water of 
the same depth in Indian River Bay by way of Big Ditch. 
WILMINGTON HARBOR, DE (See Section 19 of Text) 
Depths of 21,10 and 7 feet and jetties. 
Purchase or construct a dredge and auxiliaries 
including a wharf and depot, and maintenance of 
project. 
Entrance channel and basin with 25-foot depth and 
construction by local interests of new south jetty. 
A 30-foot depth between Delaware River and Lobdell 
Canal and modification or removal of a portion of 
north jetty. 
Approved channel and turning basin deepened from 35 
to 38 feet and the turning basin widened from 200 
to 320 feet. 
H.Doc. 304, 81st Cong., 
1st sess. 
H. Doc. 66, 54th Cong., 
1st sess. 
Annual Report, 1897 
p. 12501 
H. Doc. 359, 62d Cong., 
2nd sess. 
H. Doc. 114, 67th Cong., 
1st sess. and S. 
Committee Print, 68th 
Cong., 1st sess. 
Rivers and Harbors 
Committee Doc. 20, 
71st Cong. 2d sess. 
Rivers and Harbors 
Committee, Section 
107 
3-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 3-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug 30, 19358 Rivers and Harbors 
Committee Doc. 32 
73d Cong., 2d sess. 
H. Doc. 658, 76th Cong., 
3rd sess. 
S. Doc. 88, 86th Cong., 
2d sess. 
Oct 17, 1940 
Completion of new south jetty by the United States 
subject to provision that city of Wilmington 
reimburse the United States for cost, without 
interest, of any part of structure that may 
subsequently be occupied and utilized for city 
activities. 
Permit temporary occupancy by city of Wilmington 
of any part of south jetty for city activities 
under revocable license, provided occupied portion 
of jetty is properly maintained without expense to 
the United States. 
A 35-foot depth between Delaware River ship channel 
and Lobdell Canal including turning basin of same 
depth, opposite Wilmington Marine Terminal, 200 feet 
wide, 2,900 feet long on north side of channel, and 
2,000 feet long on north side of basin. 
BELTZVILLE LAKE, PA (See Section 22 of Text) 
Provides for multiple-purpose development for water 
supply flood control and recreation 
BLUE MARSH LAKE, PA (See Section 23 of Text) 
Provides for multiple purpose development for water 
supply, flood, control, and recreation. Site is 
located on Tulpehocken Creek about 11/2 miles upstream 
from its confluence with Plum Creek and about 
six miles northwest of Reading, PA. 
DELAWARE COAST PROTECTION (Section 24 of Text) 
Provides for Federal participation in the cost 
of restoration and subsequent periodic nourishment, 
not to exceed 10 years, of the shore from Rehoboth 
Beach to Indian River Inlet. 
Project is modified to authorize the construction 
of sand bypass facilities and stone revetment erosion 
control measures at Indian River Inlet, DE. 
FRANCIS E. WALTER DAM, PA (Section 27 of Text) 
Provided for a single-purpose flood control reservoir 
Provides for a multiple-purpose development for 
water supply and recreation. 
GENERAL EDGAR JADWIN DAM AND RESERVOIR, PA 
(Section 28 of Text) 
A single-purpose flood control reservoir with a 
capacity of 24,500 acre-feet formed by an earth 
embankment. 
PROMPTON LAKE, PA (Section 29 of Text) 
Provides for a single-purpose flood control reservoir. 
Provides for multiple-purpose development for water 
supply and recreation in addition to present singlepurpose 
flood control project. 
H. Doc 587, 79th Cong., 
2d sess. 
H. Doc 522, 87th Cong., 
2d sess. 
H. Doc 113, 80th Cong., 
1st sess. 
H. Doc. 113, 80th Cong., 
1st sess. 
H. Doc 522, 87th Cong., 
2d sess. 
Contains latest published maps. 
Also Public Works Administration, September 6, 1933, and 
Emergency Relief Administration, May 28, 1935 
Also Public Works Administration. 
Channel 37 feet deep and 600 feet wide from Naval Base to 
Philadelphia-Camden Bridge, deferred for restudy. 
5. Chanel 37 feet deep and 600 feet wide from 
Philadelphia-Camden Bridge to Allegheny Ave. deferred for 
restudy. 
6. Extension of jetties considered to be active. 
7. The 10 and 12 foot anchorages are considered inactive. 
8. Also May 28,1935,under Emergency Relief Administration. 
3-24 
H. Doc .522, 87th Cong., 
2d sess. 
H. Doc. 522, 87th Cong., 
2d sess. 
H. Doc. 90, 90th Cong 
2nd sess. 
WRDA of 1986 
Sec. 869 
July 14, 1960 
Nov 17, 1986 
1. 
2. 
3. 
4.

PHILADELPHIA, PA. DISTRICT 
TABLE 3-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Completed Projects Status Report for Construction Maintenance 
Active Projects 
Absecon Creek, NJ1 COMPLETED 1969 11,935 167,682* 
Absecon Inlet, NJ COMPLETED 1984 534,209 2,939,312 
Appoquinimink River, DE COMPLETED 1934 36,973 41,270 
Big Timber Creek, NJ' COMPLETED 1962 58,6652 53,916* 
Broadkill River, DE COMPLETED 1976 68,228 243,641 
Cedar Creek, Sussex City, DE COMPLETED - 256,100 - 
Cooper River, NJ' COMPLETED 1962 33,102 379,244* 
Delaware River, Pennsville, NJ COMPLETED - 256,624 - 
Double Creek, NJ' COMPLETED 1912 7,800 _ 
Harbor of Refuge COMPLETED 1985 516,230 1,104,769 
Inland Waterway from Chincoteague 
Bay to Delaware Bay COMPLETED 1981 168,41213 98,36014 
Little River, DE COMPLETED 1980 12,016 288,310 
Mantua Creek, NJ COMPLETED 1966 169,687 339,340* 
**Neshaminy State Park Harbor, PA COMPLETED 1968 128,20316 54,601 
Oldmans Creek, NJ COMPLETED 1941 31,188 32,125 
**Pepper Creek, DE1 COMPLETED 1965 138,0945 1,797* 
Raccoon Creek, NJ COMPLETED 1981 83,66515 341,734 
St. Jones River, DE 1961 - - 
Delaware Bay to Lebanon"" COMPLETED - 207,102 66,093 
Jetties and entrance at mouth - - - 
Manasquan River, NJ COMPLETED 1986 8,006,80718,20 3,417,55719 
Murderkill River, NJ COMPLETED 1986 37,630 1,265,067 
Schuylkill River above Fairmount 
Dam, PA' COMPLETED 1955 4,291,810 _ 
Smyrna River, DE 1949 -- 
Delaware River to Wharf at 
Smyrna Landing" COMPLETED - 198,844 197,327 
Wharf at Smyrna Landing to 
fixed bridge. SEE TABLE 3-G - - 
Toms River, NJ 1950 -- 
Channel 5 feet deep' COMPLETED - 10,050 33,311 
Channel 12 feet deep8 SEE TABLE 3-G - - - 
Tuckerton Creek, NJ COMPLETED 1986 60,242 638,860 
Woodbury Creek, NJ' COMPLETED 1940 27,09312 56,474 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Inactive Projects Status Report for Construction Maintenance 
Alloway Creek, NJ' INACTIVE 1931 21,398 35,761 
Aquatic Plant Control INACTIVE 1975 87,594 - 
Chester River, PA3 INACTIVE 1931 6,000 1139 
Dennis Creek, NJ' INACTIVE 1897 4,701 - 
Goshen Creek, NJ 1 INACTIVE 1905 15,359 870 
Ice Harbor at Marcus Hook, PA16 INACTIVE 1928 208,964 14,336 
Ice Harbor at New Castle, DE 1 6 INACTIVE 1898 224,704 - 
Leipsic River, DE' INACTIVE 1931 36,956 32,345 
Little Egg Harbor, NJ' 4 INACTIVE -' 15,048- 
Maurice River, NJ-Channel 8 feet 
deep, Delaware Bay to mouth INACTIVE 1948 -- 
3-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
OTHER AUTHORIZED 
NAVIGATION PROJECTS (Cont 
For Last 
Full Report 
See Annual 
Cost to September 30, 1987 
Operation and 
Deferred Projects Status Report for Construction Maintenance 
St. Jones River, DE 1961 - - 
Delaware Bay to Lebanon"1'1 - 207,102 66,093 
Jetties and new entrance at 
mouth9 DEFERRED - - - 
Completed. 
Excludes $50,000 contributed funds expended for new 
work. 
Includes $6,000 new work and $63 maintenance funds 
expended on previous projects. 
Abandonment recommended in House Doc. 467, 69th 
Congress, 1st Sess. 
Maintenance assumed by local interests. 
Harbor not now required by commerce. 
Last appropriation for project was in 1852. No 
information is at hand relative to work done. 
Includes $3,000 for new work for previous projects. 
Deferred 
Includes $54,590 new work and $28,935 maintenance 
funds expended on previous projects. 
11. 
12. 
13. 
14. 
15. 
16. 
17. 
18. 
19. 
20. 
Includes $55,085 new work and $22,723 maintenance 
funds expended on previous projects. 
Includes $2,950 new work funds expended on previous 
projects. 
Entire amount expended on previous projects repealed 
in 1905. 
Excludes $2,000 contributed funds and includes $25,330 
for maintenance for previous projects. 
Includes $757 new work funds expended on previous 
projects. 
xcludes $327,957 contributed funds allotted expended 
for new work. 
Excludes $38,988 non-Federal funds. 
Includes $39,000 for new work for previous projects. 
Includes $2,054 for maintenance for previous projects. 
Includes $555,600 for previous project. 
***OPrpoejreacttiso nau athnodr imzeadin bteyn tahnec eC hfiigeuf re includes cost incurred for preparation of environmental impact statements. of Engineers. 
3-26 
TABLE 3-C 
1. 
2. 
3. 
4. 
5. 
6. 
7. 
8. 
9. 
10.

PHILADELPHIA, PA. DISTRICT 
TABLE 3-D 
OTHER AUTHORIZED 
BEACH EROSION CONTROL PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Corson Inlet and Ludlam Beach, NJ ACTIVE* 1978 314,400 - 
Great Egg Harbor Inlet and Peck Beach, NJ ACTIVE* 1978 387,882 
Townsend Inlet and Seven Mile Beach, NJ ACTIVE* - - 
Absecon Island* ACTIVE -- 
Brigantine Island* ACTIVE - - 
Corson Inlet and Ludlam Beach, NJ ACTIVE * 1978 314,400 - 
Great Egg Harbor Inlet and Peck 
Beach, NJ ACTIVE * 1978 387,882 - 
Hereford Inlet* ACTIVE - - 
Long Beach Island* ACTIVE - - 
Townsend Inlet and Seven Mile 
Beach, NJ ACTIVE * - -- 
Atlantic City, NJ INACTIVE 1972 2,083,289 1 
Ocean City, NJ INACTIVE 1969 395,8313 1 
Stone Harbor, NJ INACTIVE 1961 - 1 
Barnegat Light, NJ DEFERRED 1964 70,908 1 
Cape May City, NJ DEFERRED 1961 22,9572 1 
Long Beach Island, NJ DEFERRED 1964 40,665 1 
North Wildwood, NJ DEFERRED 1961 - 1 
Rehoboth Beach to Indian River 
Inlet, DE4 1965 326,116 1 
Ventnor, Margate and Longport, NJ DEFERRED 1961 -- 1 
1. Operation and maintenance required under Public 3. Excludes cost of $1,146,325 to local interests and 
Works Acceleration Program for by law to be assumed by $272,766 Federal participation expended under 
local interests. Extension of five existing groins Extension of five existing groins completed 11 May 1964. 
completed 4. This project was included in and modified by the 
2. Excludes $58,585 Accelerated Public 11 May 1964. Delaware Coast project. 
Works funds expended for extension 
* NO CURRENT YEAR FUNDS. 
OTHER AUTHORIZED 
TABLE 3-E FLOOD CONTROL PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Allentown, Lehigh River, PA COMPLETED 1961 1,615,581 -1 
Bethlehem, Lehigh River, PA COMPLETED 1966 4,520,995 - 
Mt. Holly, NJ COMPLETED 1946 283,655 -1 
Pottstown, PA ACTIVE 1984 487,366 - 
Tamaqua, PA4 ACTIVE 1984 524,373 - 
Hay Creek, Birdsboro, PA INACTIVE 1984 335,299 - 
Maintenance assumed by local interest as required by 
authorizing project. 
New project deferred. 
3. $1,316,464 expended for pre-construction planning only. 
4. Transferred to Baltimore Dist. in 1982. 
3-27 
1. 
2.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 3-F MULTIPURPOSE PROJECT INCLUDING POWER 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Report for Construction Maintenance 
Tocks Island Lake, PA, NJ and NY2 1979 65,106,2601 
Tocks Island (Relocation of U.S. Route 209 only) PA2 1979 195,223 
1. Includes $3,489,088 for AE&D. Corps' authority to proceed with the project. Legislation 
2. National Parks and Recreation Act of 1978 terminated would be required to proceed with the project. 
TABLE 3-G DEAUTHORIZED PROJECTS 
For Last Full Date Federal Contributed 
Report See Annual And Funds Funds 
Navigation Projects Report For Authority Expended Expended 
Appoquinimink River, DE1 1931 3 Oct 78 
HD 95-351 $ 78,243- 
Aquashicola Reservoir, PA 1963 17 Nov 86 
PL 99-662 46 Stat. 
918 - - 
Chester River, 17 Nov 86 
Delaware County, PA 1931 PL 99-662 52 Stat. 
323- 
Delaware River, Mouth of 5 Aug 77 
Neversink 1917 HD 94-192 - - 
Maurice River, NJ 1948 Section 12 PL 93-251 
Millville fixed bridge to upper end of project 2 
Maiden Creek Reservoir, PA 1963 17 Nov 86 
PL 99-662 46 Stat. 918 -- 
Oldmans Creek, NJ 1941 2 Nov 79 
Section 12 PL 93-251 $ 63,313- 
Rancocas River, NJ4 1942 2 Nov 79 
Section 12 PL 93-251 $ 57,590- 
Smyrna River, DE5 1949 2 Nov 79 
Wharf at Smyrna Landing to fixed bridge. HD 95-157 $396,169- 
Toms River, NJ6 1950 2 Nov 79 
Channel 12 feet deep Section 12 PL 93-251 $43,361- 
Trexler Lake, PA 1981 17 Nov 86 
PL 99-662 76 Stat. 1180 -- 
Flood Control Projects 
2 Nov 79 
Lehigh River at Bethlehem, Section 12 PA7 1966 PL 93-251 $4,520,995 
1. Includes $36,973 new work, and $41,270 for maintenance. 
2. There is no need now for this portion of the project. 
3. Includes $31,188 new work, and $32,125 for maintenance. 
4. Includes $44,500 new work, and $13,090 for maintenance. 
5. Includes $143,759 new work, $55,085 previous project, $174,602 
for maintenance, and $22,723 maintenance, previous project. 
6. Includes $10,050 new work, and $33,311 for maintenance. 
7. Maintenance assumed by local interest. 
3-28

BALTIMORE, MD DISTRICT * 
This district comprises the watershed of Susquehanna 
River and its tributaries from headwaters in south 
central New York State through central Pennsylvania to 
its mouth in Chesapeake Bay; watershed of the Potomac 
River and its tributaries from headwaters in Maryland, 
eastern West Virginia, and Northern Virginia to its 
mouth in Chesapeake Bay; District of Columbia; and 
southwestern portion of Delaware. It includes that portion 
of Chesapeake Bay and its tributaries north of Smith 
Point, MD, on western shore of the bay, and includes that 
portion of Maryland between Chesapeake Bay and 
Atlantic Ocean. 
IMPROVEMENTS 
Navigation 
1. Baltimore Harbor and 
Channels, MD and VA ............... 
2. Baltimore Harbor, MD, 
Collection and Removal of Drift ....... 
3. Cambridge Harbor, MD ................ 
4. Claiborne Harbor, MD ............... 
5. Fishing Creek, MD.................. 
6. Herring Bay and Rockhold 
Creek, MD ....................... 
7. Herring Creek, MD .................... 
8. Island Creek, St. Georges 
Island, MD...................... 
9. Lower Thorofare, Deal 
Island, MD ......................... 
10. Nanticoke River (Including 
Northwest Fork), DE & MD .......... 
11. Ocean City Harbor and Inlet and 
Sinepuxent Bay, MD ................ 
12. Parish Creek, MD................... 
13. Potomac and Anacostia 
Rivers, DC, Collection 
and Removal of Drift ................ 
14. Potomac River-Aquatic 
Plant Control, MD, VA, DC........... 
15. Prevention of Obstructions 
and Injurious Deposits, 
Baltimore Harbor, MD............... 
16. St. Patricks Creek, MD ................ 
17. Shallow Creek, MD.................. 
18. Slaughter Creek, MD................. 
19. Tred Avon River, MD ................. 
20. Twitch Cove and Big 
Thorofare, MD.................... 
21. Upper Thorofare, MD ................. 
22. Washington Harbor, DC ............... 
23. Wicomico River, MD .................. 
Page 
4-3 
4-4 
4-4 
4-4 
4-5 
4-5 
4-5 
4-6 
4-6 
4-6 
4-7 
4-7 
Navigation (cont'd) 
24. Reconnaissance and Condition Surveys... 
25. Navigation work under special 
authorization ....................... 
Beach Erosion Control 
26. Beach Erosion Control Work 
under special authorization ........... 
Flood Control 
27. Jennings Randolph Lake, MD and WV... 
28. Fourmile Run, VA.................... 
29. Cumberland, MD, and Ridgeley, WV ..... 
30. Lackawanna River Basin, PA ........... 
30A. Aylesworth Creek Lake, PA ............ 
31. Raystown Lake, Raystown Branch, 
Juniata River, PA ................... 
32. Southern New York Flood 
32A. 
32B. 
4-7 32C. 
32D. 
4-8 32E. 
32F. 
32G. 
4-8 32H. 
4-8 321. 
4-8 32J. 
4-9 32K. 
4-9 32L. 
32M. 
4-9 32N. 
4-10 33. 
4-10 34. 
4-10 
Page 
4-11 
4-11 
4-11 
4-11 
4-11 
4-11 
4-12 
4-12 
4-12 
Control Projects ................. 4-12 
Addison, NY ....................... . 4-13 
Almond Lake, NY .................... 4-13 
Arkport Dam, NY ................... 4-13 
Avoca, NY ........................... 4-13 
Binghamton, NY.................... 4-13 
Canisteo, NY ....................... . 4-14 
Corning, NY ....................... . 4-14 
East Sidney Lake, NY................. 4-15 
Elmira, NY ....................... 4-15 
Hornell, NY........................ 4-15 
Lisle, NY .......................... 4-16 
Oxford, NY ........................ 4-16 
Whitney Point Lake, NY ............... 4-16 
Whitney Point Village, NY ............. 4-16 
Stillwater Lake, Lackawanna River, PA.. 4-16 
Susquehanna River Flood Control 
Projects, NY and PA ................ 4-17 
4-1 
l~l--Ll )~I l Il sa-n----r- ~--sr~ _ _ I_~ _ _ _ _ _ _

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Flood Control (cont'd) Page 
34A. Cowanesque Lake, PA ................. 4-17 
34B. Tioga-Hammond Lakes, PA ............ 4-17 
35. West Branch of Susquehanna River, PA . 4-18 
35A. Alvin R. Bush Dam, PA ............... 4-18 
35B. Curwensville Lake, PA................ 4-18 
35C. Foster Joseph Sayers Dam, PA ......... 4-18 
36. Francis E. Walter Dam, PA ............ 4-18 
37. Tamaqua, PA ....................... 4-19 
38. Wyoming Valley, PA .................. 4-19 
39. York, Indian Rock Dam, PA ............ 4-19 
40. Inspection of Completed Flood 
Control Projects ................... 4-20 
41. Scheduling Flood Control Reservoir 
Operations ....................... . 4-20 
42. Flood Control Work under special 
authorization ..................... . 4-20 
Water Supply 
43. Washington Aqueduct ................ :4-20 
General Investigations 
44. Surveys .......................... 4-21 
General Investigations (cont'd) Page 
45. Collection and Study of Basic Data ...... 4-21 
16. Pre-construction Engineering and 
Design ............................. 4-21 
Tables 
Table 4-A Cost and Financial Statement ...... 
Table 4-B Authorizing Legislation ........... 
Table 4-C Other Authorized 
Navigation Projects .............. 
Table 4-D Other Authorized Beach Erosion 
Control Projects ................. 
Table 4-E Other Authorized Flood 
Control Projects................ 
Table 4-F Not Applicable 
Table 4-G Deauthorized Projects ............ 
Table 4-H Reconnaissance and 
Condition Surveys ............... 
Table 4-I Inspection of 
Completed Projects .............. 
4-22 
4-28 
4-33 
4-35 
4-36 
4-37 
4-38 
4-39 
4-2

BALTIMORE, MD DISTRICT 
Navigation 
1. BALTIMORE HARBOR AND 
CHANNELS, MD AND VA 
Location. Baltimore Harbor is at the head of the 
navigable portion of Patapsco River about 12 miles 
from Chesapeake Bay. The Patapsco River rises near the 
town of Westminster in Carroll County, MD, and flows 
generally southeast for about 65 miles to enter Chesapeake 
Bay. (See National Ocean Survey Chart 12278.) 
Existing Project. 
a. A uniform main channel depth of 50 feet between 
Cape Charles, VA, and Fort McHenry at Baltimore, MD, 
with dimensions as follows: (1) Cape Henry Channel: 50 
feet deep and 1,000 feet wide from the 50-foot depth curve 
in the Atlantic Ocean to that depth in Chesapeake Bay, 
a distance of 3.0 miles; (2) York Spit Channel: 50 feet deep 
and 1,000 feet wide connecting the 50-foot depth curves 
in Chesapeake Bay near York Spit, a distance of 18.4 
miles; (3) Rappahannock Shoal Channel: 50 feet deep and 
1,000 feet wide connecting the 50-foot depth curves in 
the Chesapeake Bay opposite the Rappahannock River, 
a distance of 10.3 miles; and (4) Baltimore Harbor 
Approach Channels: 50 feet deep and generally 800 feet 
wide, widened at the approach and bends, from the 50- 
foot depth curve in Chesapeake Bay opposite the mouth 
of the Magothy River to Fort McHenry on the Patapsco 
River, a distance of 20.2 miles. 
b. Branch channels with dimensions as follows: (1) 
Connecting Channel to Chesapeake and Delaware Canal 
Approach Channel: 35 feet deep, 600 feet wide, and 15.6 
miles long from the Cutoff Angle in the main channel to 
the 35-foot depth curves in the natural channel on the 
east side of Chesapeake Bay which is part of the inland 
waterway from Delaware River to Chesapeake Bay. The 
channel includes the Brewerton Extension and Swan 
Point and Tolchester Sections; (2) Curtis Bay: 50 feet 
deep, 600 feet wide, and 2.3 miles long from the main 
channel to and including a turning basin at the head of 
Curtis Bay; (3) Curtis Creek: (a) a channel, 35 feet deep 
and generally 200 feet wide, from the 50-foot channel in 
Curtis Bay to 750 feet downstream of the Pennington 
Avenue Bridge; (b) a channel, 22 feet deep and generally 
200 feet wide, from the 35-foot channel to and along the 
marginal wharf of the Curtis Bay Ordnance Depot; (c) 
an irregular shaped 3-acre basin, with a depth of 18 feet, 
adjacent to the head of the 22-foot channel; (d) a basin, 
15 feet deep and 450 feet wide, from the end of the 22-foot 
channel to the end of the marginal wharf; and (e) a channel, 
22 feet deep and 200 feet wide, from the 22-foot 
channel south of the Baltimore and Ohio Railroad Bridge 
to the vicinity of Arundel Cove, a distance of 2,800 feet, 
thence 100 feet wide in Arundel Cove for a distance of 
2,100 feet, with an anchorage basin, 700 feet square, adjacent 
to the channel and southwest of the wharf of the 
Coast Guard Depot at Curtis Bay; (4) Middle Branch: (a) 
Ferry Bar East Section: a channel, 42 feet deep and 600 
feet wide, from the main channel at Fort McHenry to 
Ferry Bar, a distance of 1.5 miles; (b) Ferry Bar West 
Section: a channel, 35 feet deep and 400 feet wide, from 
the Ferry Bar East Section to Ferry Bar, a distance of 
0.8 mile; (c) Spring Garden Section: a channel, 27 feet 
deep and 250 feet wide, from Ferry Bar to and including 
a turning and anchorage basin immediately below the 
Western Maryland Railway Bridge, a distance of 1.0 mile; 
and (5) Northwest Branch: Federal maintenance of 
39-foot or 35-foot deep channels after either depth has 
been provided by local interests: (a) East Channel: a channel, 
49 feet deep, 600 feet wide, and 1.0 mile long with 
a turning basin at the head of the channel from that 
depth existing at the time of construction; and (b) West 
Channel: a channel, 40 feet deep, 600 feet wide, and 1.3 
miles long with a turning basin at the head of the channel 
from that depth existing at the time of construction. 
c. The following anchorages: (1) Quarantine Anchorage: 
35 feet deep, 3,500 feet long, and 600 feet wide; 
(2) Riverview Anchorage No. 2: 30 feet deep, 2,400 feet 
long, and 1,200 feet wide; (3) Riverview Anchorage No. 
1: 35 feet deep, 4,500 feet long, and 1,500 feet wide; and 
(4) Fort McHenry Anchorage: 35 feet deep, 3,500 feet 
long, and 400 feet wide. 
The mean range of tide is 2.8 feet at the Cape Henry 
Channel, 2.3 feet at the York Spit Channel, 1.4 feet at 
the Rappahannock Shoal Channel, 0.8 foot at the 
Craighill Entrance, 0.9 foot in the Cutoff Section, 1.1 feet 
at Fort McHenry, and 1.2 feet at Pooles Island in the 
upper Chesapeake Bay. Depths refer to mean low water. 
Estimated cost for new work is $379,541,000 which includes: 
$8,330,000 for completed work through the River 
and Harbor Act of 1945; $38,411,000 for work completed 
under the River and Harbor Act of 1958 of which 
$33,991,000 is Corps of Engineers, $60,000 is U.S. Coast 
Guard and $4,360,000 is non-Federal; and $332,800,000 
(October 1987 prices) for work authorized by the River 
and Harbor Act of 1970, of which $450,000 is U.S. Coast 
Guard and $332,350,000 is Corps of Engineers and non- 
Federal. 
Widening 35-foot depth from Port Covington Channel 
from 150 to 400 feet to Ferry Bar, widening 27-foot depth 
channel from 150 to 250 feet to Hanover Street Bridge, 
and providing a channel 27 feet deep by 250 feet wide 
to Western Maryland Railway Bridge with an anchorage 
and turning basin at upper end is considered inactive and 
is excluded from the foregoing estimate. Estimated cost 
(1954) of this portion is $1,603,000. 
Local cooperation. Requirements are described in full 
on page 4-3 of Fiscal Year 1982 Annual Report. 
Terminal facilities. The Port of Baltimore has 45 miles 
of waterfront of which 25 miles are industrially developed. 
There are 94 covered and open overseas piers for 
the loading and discharging of 173 ships, providing 84 
general cargo, 65 specialized cargo, and 24 public bulk 
cargo berths. The existing ground storage is equivalent 
to 53,700 railroad cars of cargo. There are 31 public 
general merchandise warehouses, with 4.9 million square 
feet of storage space and 4.7 million cubic feet of cold 
storage space. Eight ship-building, ship repair, and ship 
dismantling yards are available for handling up to 90 vessels. 
The three grain elevators in the port have a capacity 
of about 13 million bushels. Latest description of 
terminal facilities is in "Port Series No. 10 (revised 1983)" 
on Port of Baltimore, MD, (issued by Board of Engineers 
for Rivers and Harbors). 
4-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Operations and results during fiscal year. New Work, 
Baltimore District: Remaining work under the River and 
Harbor Act of 1958, deepening and widening the Connecting 
Channel (Brewerton Channel Eastern Extension), 
from 27 feet deep and 400 feet wide to 35 feet deep and 
450 feet wide, by contract, which commenced on August 
22, 1986, was completed on December 21, 1986. A total 
of 3,978,440 cubic yards was dredged and deposited in 
Hart-Miller Island at a cost of $8,522,364. Construction 
of the work authorized by the River & Harbor Act of 1970 
was initiated in February 1987. New work dredging, by 
contract, of 13,845,600 cubic yards from the Craighill 
Angle, Craighill Upper Range, Fort McHenry Channel, 
Curtis Bay Channel, and East and West Channels, Northwest 
Branch at a cost of $50,817,500 commenced on June 
2, 1987 and was approximately 38% complete as of 
September 30, 1987. 
New Work Norfolk District: New work dredging, by 
contract, of 5,003,400 cubic yards from the Rappahannock 
Shoal Channel at a cost of $4,957,700 commenced 
on March 12, 1987 and was essentially completed 
on May 28, 1987. New work dredging, by contract, of 
4,999,900 cubic yards from the York Spit Channel at a 
cost of $9,299,810 commenced on April 2, 1987 and was 
79% complete as of September 30, 1987. 
Maintenance, Baltimore District: Condition surveys of 
the project channels were made. Maintenance dredging 
of the Brewerton Channel Eastern Extension, Swan 
Point and Tolchester Channels, by contract, which began 
on July 11, 1986 and was completed on December 21, 
1986. A total of 1,908,736 cubic yards of material was 
dredged and deposited in the Hart-Miller Island containment 
facility at a cost of $5,585,000. Maintenance dredging 
of 878,100 cubic yards, by contract, from the Craighill 
Angle, Craighill Upper Range, Fort McHenry Channel, 
and Curtis Bay Channel at a cost of $3,081,500 
commenced on June 2, 1987 in conjunction with new 
work dredging of the work authorized under the River 
and Harbor Act of 1970 and was 74% complete as of 
September 30, 1987. 
Maintenance, Norfolk District: A condition survey 
of the Cape Henry Channel was made. Maintenance 
dredging of 6,300 cubic yards from the Rappahannock 
Shoal Channel at a cost of $6,200 commenced on March 
12, 1987 and was essentially completed on May 28, 
1987. Maintenance dredging of 21,100 cubic yards from 
the York Spit Channel at a cost of $39,250 commenced 
on April 2, 1987 and was 79% complete as of September 
30, 1987. 
2. BALTIMORE HARBOR, MD 
COLLECTION AND REMOVAL 
OF DRIFT 
Location. Project applies to Baltimore Harbor, MD, 
and its tributaries. 
Existing project. Provides for collection and removal 
of drift from Baltimore Harbor and its tributary waters, 
and authorizes the Secretary of the Army to allot such 
amounts as may be necessary for work from appropriations 
for maintenance and improvement of existing river 
and harbor works or other available appropriations, and 
that this work shall be carried as a separate and distinct 
project. It is wholly a work of maintenance. Purpose of 
work is to afford relief from variable conditions of obstruction. 
Local cooperation. None required. 
Terminal facilities. See Section 1 of this text. 
Operations and results during fiscal year. Maintenance: 
Operations, by hired labor, consisted of collection 
and disposal of 19,440 cubic feet of driftwood, 
ranging from small blocks up to timbers of large 
dimensions. 
3. CAMBRIDGE HARBOR, MD 
Location. This harbor is a tidal estuary on the south 
side of Choptank River about 18 miles above its mouth. 
It is approximately 70 miles southeast of Baltimore 
Harbor. (See Coast and Geodetic Survey Chart 1225.) 
Previous project. For details see page 1789 of Annual 
Report for 1915, page 424 of Annual Report for 1924, and 
page 373 of Annual Report for 1938. 
Existing project. Provides for a channel 150 feet wide 
and 25 feet deep at mean low water from that depth in 
the Choptank River for an approximate distance of 2,000 
feet; then widen into a triangular shaped turning basin 
25 feet deep, 1,400 feet long and 750 feet wide; then 
continue with a channel 150 feet wide and 16 feet deep 
to the Market Street Bridge over Cambridge Creek; then 
100 feet wide and 16 feet deep to the head of the harbor 
with a turning basin of the same depth and irregular 
dimensions comprising approximately 2.4 acres; an 
anchorage basin 10 feet deep, 400 feet long and 175 feet 
wide on the west side of the channel; another basin of 
the same depth, 225 feet long, and 200 feet wide on the 
east side of the channel below the bridge; and a channel 
60 feet wide and 7 feet deep from that depth in the 
Choptank River to the municipal boat basin north of the 
harbor entrance. 
Local cooperation. Fully complied with except local 
interests are to furnish spoil disposal areas for future 
maintenance. 
Terminal facilities. The waterfront of Cambridge is 
generally built of solid bulkhead wharves and pile and 
timber piers, only a few of which have mechanical freighthandling 
facilities. With the exception of a municipally 
owned terminal which is open to the public, the wharves 
are privately owned. There are town marine railways with 
boat-repair shops, five oil and gasoline terminals, two 
large fertilizer companies and one large packing house 
located on the shore of Cambridge Creek. 
Operations and results during fiscal year. Maintenance: 
Engineering and design work was accomplished 
in connection with proposed maintenance dredging. 
4. CLAIBORNE HARBOR, MD 
Location. The harbor is located on the eastern side of 
Eastern Bay, an arm of Chesapeake Bay, about 42 miles 
4-4

BALTIMORE, MD DISTRICT 
southeast of Baltimore Harbor. (See U.S. Coast and 
Geodetic Survey Chart No. 1225.) 
Existing project. This provides for a channel 14 feet 
deep from the vicinity of the harbor wharves to deep 
water in Eastern Bay with widths of 100 feet at mean 
low water for a distance of 1,800 feet to the bend opposite 
the existing Black Beacon, thence widening in a distance 
of 260 feet to 150 feet to the 14-foot depth in 
Eastern Bay, with necessary widening at the bends. The 
total length of the channel is about 4,400 feet. The project 
also provides for a 250-foot extension of the jetty built 
by the railway company. 
Terminal facilities. There are two solid bulkhead 
wharves, with open pile piers at their outer ends, served 
by this improvement. 
Operations and results during fiscal year. Maintenance: 
A maintenance dredging contract was completed 
on March 29, 1987. A total of 18,000 cubic yards 
of material was removed. Rehabilitation of revetment 
(500 L.F. ) was completed February 3, 1987. 
5. FISHING CREEK, MD 
Location. A narrow winding tidal stream which enters 
Chesapeake Bay from the west 56 miles south of Baltimore 
and about 26 miles south of Annapolis, MD. (See 
U.S. Coast and Geodetic Survey Chart 12266.) 
Existing project. A channel 7 feet deep with widths 
of 100 and 60 feet from deep water in the Chesapeake 
Bay to an anchorage of same depth, 120 feet wide and 
400 feet long, located in marsh 500 feet above mouth of 
creek, and twin stone jetties at entrance; north jetty is 
about 1,050 feet long, and south jetty about 1,100 feet 
long. The mean range of tide is about 1 foot. Cost of new 
work for the completed project was $111,242. 
Local cooperation. Fully complied with except that 
local interests are to furnish spoil disposal areas as needed 
for future maintenance. 
Terminal facilities. Seven hundred feet of bulkhead 
wharf are available on the south side of the entrance 
channel running west from bay shore, and the U.S. Navy 
Department constructed a pile-and-timber wharf on west 
side of basin. 
Operations and results during fiscal year. Maintenance: 
Engineering and design work was accomplished 
in connection with proposed maintenance dredging. 
6. HERRING BAY AND 
ROCKHOLD CREEK, MD 
Location. Herring Bay is a wide-mouthed indentation 
on the west side of Chesapeake Bay about 20 miles below 
Annapolis, MD. It is about 3 miles long from north to 
south and penetrates the shore for a depth of about 1 
mile. Rockhold Creek, which is about 2.5 miles long, is 
an estuary which extends northward from the northerly 
end of Herring Bay. (See U.S. Coast and Geodetic Survey 
Chart 1225.) 
Existing project. Provides for channel 7 feet deep and 
60 feet wide from 7-foot contour in Herring Bay to 
vicinity of county wharf on Rockhold Creek, with turning 
basin of same depth, 100 feet wide and 150 feet long 
at head of channel, and a stone breakwater approximately 
900 feet long east of entrance channel. Mean 
range of tide is about 1.5 feet and extreme tidal range 
about 4 feet. The Federal cost of new work for completed 
project was $50,591. 
Local cooperation. Fully complied with except local interests 
are to furnish disposal areas for future maintenance 
as needed. 
Terminal facilities. Consists of a public wharf on Rockhold 
Creek about 600 feet below the county bridge, open 
to all, together with a few private landing stages. No 
freight-handling devices are installed on any of the 
wharves which are considered adequate for existing 
commerce. 
Operations and results during fiscal year. Maintenance: 
A maintenance dredging contract was awarded 
on August 11, 1987, to remove approximately 36,000 
cubic yards of material. 
7. HERRING CREEK, MD 
Location. Herring Creek in St. Marys County, MD., is 
a small tidal stream 1 miles in length which flows in 
a westerly direction and enters the north bank of the 
Potomac River 16 miles upstream of its mouth at 
Chesapeake Bay and 92 miles downstream from 
Washington, DC (See U.S. Coast and Geodetic Survey 
Chart No. 557.) 
Existing project. This provides for an entrance channel 
6 feet deep, 60 feet wide, and approximately 1,630 
feet long extending from deep water in the Potomac River 
to deep water within the creek, a turning basin of irregular 
shape 6 feet deep adjacent to the proposed public 
wharf, and riprap-stone jetties on the upstream and 
downstream sides of the entrance channel 770 and 650 
feet long, respectively. The plane of reference is mean low 
water. The tidal ranges are: Mean, 1.6 feet; irregular, 1.9 
feet; and extreme, approximately 7 feet. The project was 
modified in 1986 under Section 111 of the River and Harbor 
Act of 1968. The modification consists of constructing 
250 feet of beachfill, 2,187 linear feet of stone 
revetment and upgrading 350 linear feet of existing revetment 
along the Tall Timbers waterfront south of the 
project inlet to preclude shoreline erosion induced by the 
project jetties. 
Local cooperation. The Local Cooperation Agreement 
(LCA) includes the following provisions: 
1. The Local Sponsor will assume full responsibility 
for initial project costs in excess of the $1,000,000 
Federal Cost Limitation. 
2. Compliance with the Uniform Relocation Assistance 
and Real Property Acquisitions Policies Act of 1970. 
3. Provide without cost to the United States, when 
and as required all lands, easements, rights-of-way 
and soil-disposal areas necessary for the construction 
and subsequent maintenance of the project. 
4-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
4. Hold and save the United States free from damages 
to other property resulting from the improvement. 
Terminal facilities. There are a number of small 
wharves and landings within the creek, all privately 
owned. The facilities are considered adequate for present 
commerce. 
Operations and results during fiscal year. New work: 
The contract for construction of the project modification 
was completed on June 9, 1987. 
8. ISLAND CREEK, ST. GEORGES 
ISLAND, MD 
Location. Island Creek in St. Marys County, MD., is 
a tidal estuary three-fourths of a mile long, flowing in a 
southeasterly direction and entering the right bank of 
St. Marys River at its junction with the Potomac River, 
11 miles upstream of the Chesapeake Bay and 97 miles 
downstream from Washington, DC. It lies entirely within 
the lower half of St. Georges Island. (See U.S. Coast and 
Geodetic Survey Chart 557.) 
Existing project. Provides for a channel 5 feet deep, 
50 feet wide, and 2,000 feet long from the St. Marys River 
through the entrance to Island Creek and a turning basin 
5 feet deep, 200 feet wide, and 500 feet long within 
the creek. The plane of reference is mean low water. The 
tidal ranges are: Mean, 1.5 feet; irregular, 2.5 feet; and 
extreme, approximately 7 feet. Costs of Federal new work 
for the completed project were $6,230. 
Local cooperation. Fully complied with except local interests 
are to furnish spoil disposal areas for future maintenance 
as needed. 
Terminal facilities. On Island Creek there are five 
small private landings or stagings which are considered 
adequate for present commerce. 
Operations and results during fiscal year. Maintenance: 
A maintenance dredging contract was awarded 
on September 1, 1987 to remove approximately 9,000 
cubic yards of material. 
9. LOWER THOROFARE, DEAL 
ISLAND, MD 
Location. This is a tidal waterway, about 1.5 miles long 
and from one-eighth to one-half mile wide, branching off 
from Tangier Sound between Deal Island and Little Deal 
Island, MD. It is about 12 miles north of Crisfield Harbor, 
MD. (See U.S. Coast and Geodetic Survey Chart 78.) 
Previous project. The original project was dated March 
3, 1881. For further details see page 1790 of Annual 
Report for 1915. 
Existing project. Provides for a channel 60 feet wide 
and 7 feet deep from that depth in Tangier Sound to and 
including a mooring basin of the same depth, 100 feet 
wide and 300 feet long, in the marsh at the head of the 
cove at Wenona. The cost for new work for the completed 
project was $39,658, exclusive of amounts expended 
under previous projects. 
Local cooperation. Fully complied with except local interests 
are required to furnish spoil disposal areas for future 
maintenance as needed. 
Terminal facilities. There are three packing-house 
wharves and a small marine railway above the head of 
the project channel at Wenona. The facilities are privately 
owned but are open to the public for transaction of 
business with the owners. Present facilities are adequate 
for existing commerce. Sufficient areas are available for 
the construction of additional terminals when and as required. 
Operations and results during fiscal year. New Work: 
Construction was completed on July 24, 1987 for a 750 
L.F. stone jetty and 900 L.F. breakwater. Maintenance: 
A maintenance dredging contract was completed on 
January 3, 1987. A total of 42,000 cubic yards of material 
was removed. 
10. NANTICOKE RIVER (INCLUDING 
NORTHWEST FORK), DE & MD 
Location. Headwaters of Nanticoke River consist of 
numerous branches rising mainly in the northern portion 
of Sussex County, DE. The river is about 50 miles long 
and flows southwesterly from its source to Tangier 
Sound. 
Northwest Fork is a branch of Nanticoke River which 
rises in Kent County, DE, and flows past Federalsburg, 
MD, generally southerly through Dorchester County, 
MD, to its junction with the main river opposite Riverton, 
MD. It is about 30 miles long. (See Coast and 
Geodetic Survey Chart 77.) 
Existing project. Nanticoke River: Channel 12 feet deep 
and 100 feet wide from the 12-foot depth curve in Tangier 
Sound to the highway bridge at Seaford, DE, with a turning 
basin at the upper end. Disjointed sections included 
in the project is about 4 miles long, extending over 32 
miles of river; lower end of the first section of the project 
is about 8 miles above the mouth of the river. Mean range 
of tide is 3.4 feet, and the extreme tidal range is 4.3 feet. 
Northwest Fork: Dredging a channel 6 feet deep and 
60 feet wide at mean low water from upper Browns wharf 
to within one-half mile of the southern boundary of town 
of Federalsburg, with a turning basin at the upper end. 
Section included in the project is about 4 miles long, and 
its lower end is 11.75 miles above the mouth of the river. 
Mean range of tide is 2.6 feet. 
Local cooperation. Local interests must furnish spoil 
disposal areas for future maintenance and hold the 
United States free from damages. 
Terminal facilities. Waterfront at Seaford consists 
largely of unconnected pile-and-timber bulkhead wharves 
with earthfills. One public wharf is used as a launching 
ramp. Remaining wharves are privately owned. A rail 
siding extends along a considerable portion of waterfront 
and offers facilities for interchange of rail and water 
traffic. Existing terminals are reasonably adequate for 
present and prospective commerce. 
Terminal facilities on Northwest Fork are all privately 
owned and open to general public use. They consist of 
4-6

BALTIMORE, MD DISTRICT 
one solid bulkhead wharf of 80-foot frontage and 3 landings 
each with 60-foot frontages. Depths of water are 
from 2 to 8 feet. Landings are log revetments backed by 
earthfill and are in poor condition. 
Operations and results during fiscal year. Maintenance: 
Engineering and design was accomplished in 
connection with proposed maintenance dredging. 
11. OCEAN CITY HARBOR AND 
INLET AND SINEPUXENT BAY, MD 
Location. Ocean City is on a barrier island between 
Sinepuxent Bay and Atlantic Ocean about 35 miles south 
of entrance to Delaware Bay. (See U.S. Coast and 
Geodetic Survey Chart 1220.) 
Existing project. This provides for an inlet channel 300 
feet wide and 16 feet deep from the 16-foot depth curve 
in Atlantic Ocean through the inlet to the channel in the 
Isle of Wight Bay, protected on the south side by a stone 
jetty with a top elevation of 8.8 feet above mean low 
water and a top width of 18 feet, and on the north side 
by a stone jetty with a top elevation of 9 feet above mean 
low water and a top width of generally 20 feet, thence 
generally 200 feet wide and 16 feet deep to the project 
harbor; a depth of 14 feet and 150 feet wide to the head 
of the harbor, a length of approximately 3,400 feet; a 
channel 6 feet deep and 150 feet wide in Sinepuxent Bay 
from the inlet to Green Point, and thence 100 feet wide 
in Chincoteague Bay; and for a channel 6 feet deep and 
125 feet wide from the inlet channel to a point opposite 
North Eighth Street in Ocean City, thence 75 feet wide 
into the Isle of Wight Bay. Depths in the inlet channel 
and harbor refer to project datum. Depths in the bay 
channels refer to mean low water. 
The elevation of mean low water in the bays above 
mean low water in the ocean at Ocean City varies from 
about 0.8 foot in the vicinity of the inlet to 1.7 feet at 
their heads. The mean range of ocean tide is 3.4 feet. The 
extreme range is from 3 feet below mean low water to 
about 3.5 feet above mean high water, a total of 9.9 feet. 
In the bays the mean range of tide varies from approximately 
2.5 feet at the inlet to 0.3 foot at their heads. 
Greater fluctuations are caused by prolonged high winds. 
Federal cost of new work for the completed project was 
$1,190,530, exclusive of $500,000 contributed by local 
interests and exclusive of $3,700,000 for rehabilitating 
the south jetty. 
Local cooperation. Fully complied with except local 
interests must furnish spoil disposal areas for future 
maintenance as needed. 
Terminal facilities. On bay side of Ocean City: two 
storage basins, for pleasure and small commercial craft, 
and numerous privately owned pile-and-timber piers and 
bulkhead wharves. At project harbor: a public landing 
about 1,000 feet long, several privately constructed bulkhead 
wharves open to the public for transaction of business 
with the owners, and a boat repair yard with a 
marine railway capable of handling boats up to about 150 
tons. All piers and wharves are accessible by highway. 
Port facilities have been expanded to include all available 
space in the Fish Harbor. 
Operations and results during fiscal year. New Work: 
Construction claim for the jetty rehabilitation was paid 
at a total cost of $497,000, fiscally completing the 
project. Maintenance: Engineering and design was accomplished 
in connection with proposed maintenance 
dredging. 
12. PARISH CREEK, MD 
Location. A small branch of West River, an estuary 
of Chesapeake Bay on Maryland western shore, at Shadyside, 
MD., about 7 miles south of mouth of Severn River. 
(See U.S. Coast and Geodetic Survey Chart No. 1225.) 
Existing project. Provides for a channel 8 feet deep and 
50 feet wide, widened at ends, from deep water in West 
River to head of south fork of Parish Creek, and an anchorage 
basin at junction of north fork having a depth 
of 6 feet and an area not exceeding 1 acres. Mean tidal 
range is about 2 feet. 
Cost of new work for completed project was $19,170 
exclusive of $1,000 contributed by local interests. Average 
annual maintenance cost for past 5 years was $6,000. 
Existing project was adopted by River and Harbor Act 
of August 30, 1935. (See H. Doc. 185, 72d Cong., 1st 
Sess., which contains latest published map.) 
Local cooperation. Local interests must contribute 
$1,000 toward cost of improvement, furnish suitable 
spoil-disposal areas, and provide a suitable water freight 
terminal at head of Parish Creek, open to all on equal 
terms. Total funds required to complete project were 
provided by Works Progress Administration. Local interests 
furnished disposal areas. Not fully complied with 
in that a public wharf has not been provided. 
Terminal facilities. There are numerous timber piers, 
one bulkhead wharf, two marine railways, 300 feet of concrete 
bulkhead and 350 feet of timber bulkhead on Parish 
Creek. Piers and bulkheads are privately owned, but 
open to the public for transaction of business with owners. 
Facilities are considered adequate for existing 
commerce. 
Operations and results during fiscal year. Maintenance: 
A maintenance dredging contract was completed 
on June 13, 1987. A total of 42,000 cubic yards 
of material was removed. 
13. POTOMAC AND ANACOSTIA 
RIVERS, DC COLLECTION AND 
REMOVAL OF DRIFT 
Location. Project applies to the Potomac and 
Anacostia Rivers, Washington, DC and their tributaries. 
Existing project. Collection and removal of drift from 
the waters of the Potomac and Anacostia Rivers and 
their tributaries in the Washington area from the head 
of tidewater to Mount Vernon, VA. Total length of 
4-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
project, considering both sides of the waterway, is about 
50 miles. 
Local cooperation. None required. 
Terminal facilities. See Section 23 of this text. 
Operations and results during fiscal year. Maintenance: 
Operations by hired labor consisted of collection 
and disposal of 294,840 cubic feet of driftwood, ranging 
from small blocks up to timbers of large dimensions. 
14. POTOMAC RIVER AQUATIC PLANT 
CONTROL, MD, VA, DC 
Location. The project is located in the Potomac River 
and its tributaries with the northern boundary at Chain 
Bridge in Washington, DC extending southward to the 
U.S. Route 301 Bridge (See U.S. Coast and Geodetic 
Chart 12289). 
Existing project. On July 2, 1986 the Chief of Engineers 
under the authority of Section 302 of the 1965 
River and Harbor Act, as amended, authorized the control 
of hydrilla and other nuisance plants using mechanical 
harvesting to clear a 60 foot wide, 6 foot deep 
connecting channel from open waters to eligible public 
use areas. 
Local cooperation. The Local Cooperation Agreement 
(LCA) was signed on June 6, 1986 between the Corps, 
MD, VA, DC and Metropolitan Washington Council of 
Governments. The LCA which must be reexecuted annually 
expires on September 30, 1986 includes the following 
provisions: 1. Local sponsors share 50 percent of 
the program cost; 2. Local sponsors provide lands, easements, 
and rights-of-way; 3. Metropolitan Washington 
Council of Governments is responsible for coordinating 
local interests. 
Terminal facilities. There are 75 marina activities between 
DC and the U.S. Route 50 Bridge providing approximately 
3,400 commercial and recreational boat slips 
and 50 boat ramps. 
Operations and results during fiscal year. New Work: 
Harvesting operations resulted in 43 acres of nuisance 
aquatic plants at 17 sites in Maryland and 19 acres at 
10 sites in Virginia. There were no harvesting operations 
conducted in District of Columbia this fiscal year. 
15. PREVENTION OF OBSTRUCTIONS & 
INJURIOUS DEPOSITS, 
BALTIMORE, MD 
Location. Project applies to tidal waters of the harbor 
of Baltimore and its adjacent and tributary waters and 
to all tidal waters of Chesapeake Bay and in Maryland. 
Existing project. Patrol and inspection throughout the 
project location to detect violations of sections 13 and 
15 of the River and Harbor Act of March 3, 1899 and 
to investigate obstructions to navigation pursuant to 
Federal regulations (33 CFR 209.109). 
Local cooperation. None required. 
Operations and results during fiscal year. Maintanance: 
Operations, by Supervisor of Harbor of Baltimore 
included inspections of approximately 75 Federal 
navigation channels within the project location to insure 
channels are not obstructed to general navigation by 
debris, sunken vessels/wrecks and/or fishing appurtenance. 
There were no detailed investigations of sunken 
vessels/wrecks resulting in no declarations of "Hazards 
to Navigation" issued. 
16. ST. PATRICKS CREEK, MD 
Location. St. Patricks Creek in St. Marys County, MD 
is a small tidal stream 1 1/2 miles long which flows in a 
southeasterly direction and enters the west side of St. 
Clement Bay at its junction with the Potomac River. The 
creek is 33 miles upstream from the Chesapeake Bay and 
83 miles downstream from Washington, DC (See U. S. 
Coast and Geodetic Survey Chart No. 558). 
Existing project. Provides for an entrance channel 7 
feet deep, 60 feet wide, and approximately 2,450 feet long 
from deep water in St. Clement Bay to deep water within 
the creek. The plane of reference is mean low water. The 
tidal ranges are: mean, 1.9 feet; irregular, 2.5 feet; and 
extreme, approximately 7 feet. 
The cost to the Federal Government for new work for 
the completed project was $15,752, exclusive of $1,000 
contributed by local interests. The latest (1950) approved 
estimate for the annual cost of maintenance is $4,800. 
Local cooperation. The existing project was approved 
subject to the provisions that (a) local interests contribute 
$1,000 in cash toward the cost of new work; (b) hold 
and save the United States free from any damage resulting 
from construction and maintenance of the improvement; 
(c) furnish releases from damages to oyster 
grounds; (d) furnish free of cost to the United States 
suitable spoil-disposal areas for new work and subsequent 
maintenance, when and as required; and (e) agree 
to provide a suitable public wharf with access road open 
to all on equal terms. Items (a) through (d) have been fully 
complied with. Local interests have initiated action to 
complete item (e). 
Terminal facilities. There are 41 small wharves and 
stagings located in the creek. All are privately owned, 
but one is open to the public. There is also one marine 
railway in the creek. The terminal facilities are considered 
adequate for present commerce. 
Operations and results during fiscal year. Maintenance: 
A maintenance dredging contract was completed 
on May 5, 1987. A total of 10,000 cubic yards of 
material was removed. 
17. SHALLOW CREEK, BALTIMORE, MD 
Location. Shallow Creek is a tidal water tributary of 
the Chesapeake Bay and is located directly adjacent to 
Fort Howard Veteran's Hospital in southeast Baltimore 
County, approximately 10 miles southeast of Baltimore, 
Maryland. 
Existing project. Provides for a channel 50 feet wide 
and 5 feet deep from that depth in Chesapeake Bay to 
4-8

BALTIMORE, MD DISTRICT 
and including a turning basin of the same depth, 100 feet 
wide and 100 feet long at the head of the channel. Total 
project length is 4,000 feet. 
Local cooperation. Fully complied with except local interests 
are required to provide or pay to the Government 
the full cost of providing dredged material disposal areas 
for future maintenance as needed. 
Terminal facilities. There are a number of small 
wharves and landings within the creek, all privately 
owned. The facilities are considered adequate for present 
commerce. 
Operations and results during fiscal year. New Work: 
A maintenance dredging contract was awarded on July 
10, 1987 for removal of approximately 36,000 cubic yards 
of material and construction of a 14.5 acre disposal site. 
18. SLAUGHTER CREEK, MD 
Location. This is a waterway about 8 miles long and 
tidal throughout connecting with Little Choptank River 
5 miles from its mouth. It lies in Dorchester County, MD, 
between Taylors Island and the mainland of the eastern 
shore of Chesapeake Bay. (See U.S. Coast and Geodetic 
Survey Chart 1225.) 
Existing project. This provides for dredging a channel 
7 feet deep and 100 feet wide at mean low water through 
the bar at the mouth, a distance of about one-third of a 
mile, the lower end of the section extending about 900 
feet into Little Choptank River. The mean range of tide 
is about 1.5 feet and the extreme tidal range is 2.9 feet. 
The cost for new work, made in 1911, is $4,140. 
Local cooperation. None required. 
Terminal facilities. There is one solid bulkhead wharf 
about 300 feet long, served by this improvement. It is 
privately owned but open to general public use, and is 
considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
A maintenance dredging contract was completed 
on May 30, 1987. A total of 15,000 cubic yards of 
material was removed. Dredged material was used in conjunction 
with oyster shell culch as a beneficial use of 
dredged material demonstration to rehabilitate an existing 
unproductive oyster bar. 
19. TRED AVON RIVER, MD 
Location. This stream, formerly called Treadhaven 
Creek, rises in Talbot County, MD, flows southerly and 
empties into Choptank River 10 miles above its mouth. 
It is about 10 miles long and is a tidal estuary with very 
little natural flow. Draining area is 36 square miles. (See 
U.S. Coast and Geodetic Survey Chart 78.) 
Previous project. For details see page 397 of Annual 
Report for 1951. 
Existing project. Provides for a channel 12 feet deep 
and 150 feet wide in Tred Avon River from that depth 
in river near Peach Blossom Creek to Easton Point, 
thence a channel of same depth and width and about 
1,400 feet long in the North Fork, thence a channel of 
same width and 8 feet deep and about 700 feet long with 
a turning basin of same depth at upper end. Project also 
provides for a turning basin in South Fork 12 feet deep 
and 250 feet wide and 600 feet long on east side of main 
channel at Easton Point. Section included in project is 
about 2 miles long, and its lower end is about 7.5 miles 
above mouth. Mean range of tide is about 2 feet. 
Local cooperation. Requirements are described in full 
on page 4-11 of Fiscal Year 1979 Annual Report. 
Terminal facilities. Five large terminals for receiving 
and distributing petroleum products, and a marina with 
stalls and ships, marine railway, a launching ramp, and 
a 6-ton travel-lift at Easton Point. These facilities are in 
good condition. 
Operations and results during fiscal year. Maintenance: 
A maintenance dredging contract was awarded 
on November 25, 1986, to remove approximately 130,000 
cubic yards of material. Protest of the contract award 
delayed dredging until August 1987 and is scheduled to 
be completed in fiscal year 1988. 
20. TWITCH COVE AND BIG 
THOROFARE, MD 
Location. A tidal waterway about 4 miles long traversing 
Smith Island, MD, southeasterly from Chesapeake 
Bay on the west to Tangier Sound on the east. (See U.S. 
Coast and Geodetic Survey Chart 1224.) 
Existing project. A channel 7 feet deep at mean low 
water and 60 feet wide from Twitch Cove on Tangier 
Sound through Big Thorofare, thence through canal at 
Ewell, MD, thence through Levering Creek and Big 
Thorofare to vicinity of Swan Point, thence of same depth 
and 100 feet wide through offshore bar to deep water in 
Chesapeake Bay, with twin stone jetties at entrance, 
north jetty is about 2,080 feet long, and south jetty about 
1,800 feet long; and anchorage basin 7feet deep, 100 feet 
wide, and 700 feet long connecting with west side of 
existing project channel at Ewell; extension of existing 
project channel in Levering Creek, 6 feet deep, 60 feet 
wide, and 1,000 feet long; and a channel 4 feet deep and 
25 feet wide around point between Big Thorofare and 
Tylers River. Mean range of tide is 1.7 feet, and extreme 
tidal range is 3 feet. Federal cost of new work for completed 
project was $193,175. 
Local cooperation. Fully complied with, except that 
local interests are to furnish spoil disposal areas for 
future maintenance as needed. 
Terminal facilities. Numerous privately owned pileand-
timber wharves and bulkheads at Ewell are open to 
the public for business transactions with the owners. A 
county wharf is also at west end of town. Five crab 
houses are on Levering Creek, and one oyster house on 
project waterway west of Town of Ewell. 
Operations and results during fiscal year. Maintenance: 
A maintenance dredging contract was completed 
August 7, 1987. A total of 24,000 cubic yards of 
material was removed and used in conjunction with a 
longard tube as a beneficial use of dredged material 
demonstration. 
4-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
21. UPPER THOROFARE, DEAL 
ISLAND, MD 
Location. Natural waterway lying between Deal Island 
and mainland of Somerset County, MD., on eastern shore 
of Chesapeake Bay. (See U.S. Coast and Geodetic Survey 
Chart 1224.) 
Previous project. For details see page 277 of Annual 
Report for 1962. 
Existing project. Entrance channel from Tangier 
Sound 9 feet deep and 100 feet wide, thence of irregular 
width to and along south shore of Thorofare, protected 
by two stone breakwaters at entrance, north breakwater 
is about 410 feet long and south breakwater about 310 
feet long, with a turning basin at inner end 9 feet deep 
on south side of channel to within 50 feet of bulkhead 
along south shore, an anchorage area 6 feet deep and 150 
feet wide extending across waterway parallel to highway 
bridge to within 50 feet of bulkhead on south shore, and 
an anchorage area 650 feet long, 300 feet wide, and 9 feet 
deep on north side of channel between breakwater and 
6-foot anchorage. Mean range of tide is about 2 feet. Cost 
of new work for completed project was $62,116. 
Local cooperation. Fully complied with. 
Terminal facilities. A small packing-house wharf on 
shore of Tangier Sound south of project channel: two 
small packing houses along approach channel at which 
seafood is landed; and a public wharf at turning basin 
with a suitable road connecting it with the road system. 
Operations and results during fiscal year. Maintenance: 
A maintenance dredging contract was completed 
January 3, 1987. A total of 100,182 cubic yards 
of material was removed. 
22. WASHINGTON HARBOR, DC 
Location. Within District of Columbia at junction of 
Anacostia River with Potomac River which flows southeasterly 
108 miles to Chesapeake Bay. It is southerly 202 
miles by water from Baltimore, MD, and northerly 195 
miles from Norfolk, VA. (See U.S. Coast and Geodetic 
Survey Chart 12289.) 
Existing projects. A combination and extension of 
latest projects for Potomac River at Washington, DC, 
and Anacostia River, DC. The Washington Harbor 
project provides for a channel in the Potomac River from 
Giesboro Point to Key Bridge, a second channel from 
Giesboro Point to the end of Washington Channel, and 
a third channel from the mouth of the Anacostia River 
to the foot of 15th Street, SE, with turning basins opposite 
the Naval Weapons Plant (800 feet wide and 2,400 
feet long) and at the head of the Anacostia Channel (400 
feet square). Channel dimensions are 24 feet deep and 400 
feet wide except upstream from Anacostia Bridge where 
the width is reduced to 200 feet and from Giesboro Point 
to a point 3,000 feet downstream of Arlington Memorial 
Bridge and above Easby Point where channel dimensions 
are 20 feet deep and 200 feet wide. Channel lengths including 
turning basins are: Virginia Channel, 5,000 feet; 
Washington Channel, 10,000 feet; and Anacostia River, 
15,000 feet; and operation and maintenance of the inlet 
gates and lock and the outlet gates of the Tidal Basin 
constructed under a previous project to flush Washington 
Channel. Plane of reference is low-water datum which 
is 0.35 foot below mean low tide as observed from 1932 
to 1942. Tidal ranges are: mean, 2.9 feet; irregular, 4.5 
feet; and extreme, 10.7 feet. Federal cost of new work for 
the completed project was $162,006. 
Local cooperation. None required. 
Terminal facilities. There are four wharves generally 
of bulkhead type on Virginia Channel that are privately 
owned and not open to the public except by special 
arrangement. On Washington Channel there are four 
piers under jurisdiction of District of Columbia, two of 
which are open to the public and one open to the public 
by special arrangement. In Anacostia River there are four 
privately owned piers and eight governmental piers and 
slips. None of the piers are open to the public except by 
special arrangement. Terminal facilities are considered 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
The tidal basin gates were inspected and maintained 
by hired labor. 
23. WICOMICO RIVER, MD 
Location. Wicomico River has its source in northern 
part of Wicomico County, MD, and flows generally southwardly 
emptying into Monie Bay, a tributary of Tangier 
Sound on the east side of Chesapeake Bay about 85 miles 
southeast of Baltimore. Webster Cove is site of improved 
small-boat harbor on southeast bank of Wicomico River 
about 3 miles above the mouth. (See U.S. Coast and 
Geodetic Survey Charts 567 and 1224.) 
Existing project. Channel 14 feet deep and 150 feet 
wide from Chesapeake Bay to Salisbury, section included 
in project is 37 miles long, including about 12 miles 
from mouth of river to Chesapeake Bay; 14 feet deep in 
channels and turning basins in north and south prongs 
with channel widths of 100 feet, and a channel 6 feet deep 
and 60 feet wide extending from 6-foot contour in 
Wicomico River to and including a basin in Webster Cove 
of same depth, 100 feet wide and 400 feet long; and 
extension of basin 200 feet long and 100 feet wide on each 
side. Plane of reference is mean low water. Mean range 
of tide is about 3 feet and extreme tidal range is 4.4 feet. 
Cost of new work for completed project was $421,609, 
exclusive of amounts expended on previous project. 
Local cooperation. Fully complied with, except that 
local interests are to furnish spoil disposal areas for 
future maintenance as needed and hold the United States 
free from such damages as may occur to public or leased 
oyster beds. 
Terminal facilities. Present waterfront at Salisbury 
consists of pile-and-timber bulkheads with earthfills. 
Some wharves have warehouses and factories with 
mechanical freight-handling facilities and rail sidings. All 
terminals are privately owned. A shipyard, with two 
marine railways with capacities of 1,200 and 500 tons, 
respectively, is on right bank of river below prongs. Areas 
for development of new terminals on north prong are 
4-10

BALTIMORE, MD DISTRICT 
limited. Areas for considerable expansion of terminal 
facilities are available on main river. There is a pileand-
timber wharf about 4 miles above mouth of river at 
Mount Vernon. A wharf of similar construction is at 
White Haven. There is a county wharf at head of basin 
in Webster Cove, a pile-and-timber pier at oyster house 
on southwest side of basin, a T-shaped pile-and-timber 
pier at cafe on southwest side of basin and several small 
timber piers on walkways that local interests constructed 
around the basin. Fueling facilities are available at the 
T-shaped pier. Sufficient areas are available for construction 
of additional facilities when required. 
Operations and results during fiscal year. Maintenance: 
A maintenance dredging contract was awarded 
on August 31, 1987, to remove approximately 37,000 
cubic yards of material. 
24. RECONNAISSANCE AND CONDITION 
SURVEYS 
(See Table 4-H at end of chapter.) 
25. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Section 107, Public 
Law 86-645 (preauthorization). 
Fiscal year costs were $12,133 for Island Creek, St. 
Marys Co., MD; and $34,971 for Long Point Channel, 
Chester River, MD. 
Aquatic Plant Control pursuant to Sec. 302 of Public 
Law 89-298, as amended (preauthorization). 
Fiscal year costs were $24,992 for Chesapeake Bay 
(Hydrilla), MD. 
Beach Erosion Control 
26. BEACH EROSION 
CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Beach Erosion Control pursuant to Sec. 103 of Public 
Law 727, as amended (preauthorization). 
Fiscal year costs were $9,834 for town of North Beach, 
MD. 
Flood Control 
27. JENNINGS RANDOLPH LAKE, 
MD & WV 
Location. Project is located on the North Branch 
Potomac River on the state line between Garrett County, 
MD, and Mineral County, WV. The damsite is located 
approximately 7.9 miles upstream from the confluence 
with Savage River at Bloomington, MD. It is also about 
5 air miles southwest of the tritowns of Luke and 
Westernport, MD, and Piedmont, WV. (See Geological 
Survey quadrangle sheets, "Kitzmiller" and "Westernport," 
MD.) 
Existing project. The improvement consists of a rolled 
earth and rock fill dam with an impervious core and an 
800-foot long dike on the left bank. Top of dam is 296 
feet above streambed with a total length of 2,130 feet. 
When filled to spillway crest, the reservoir will extend 
about 6.6 miles upstream and inundate 965 acres. Flood 
control storage of 36,200 acre-feet is provided. Storage 
available for low flow augmentation for water supply and 
water quality improvement is 92,000 acre-feet. The reservoir 
controls a drainage area of 263 square miles. Recreation 
facilities are provided for picnicking, camping and 
boating. Estimated cost (October 1986) of new work is 
$176,270,300 of which $58,521,700 is required non- 
Federal reimbursement. 
Local cooperation. See page 4-15 of the 1977 Annual 
Report for requirements. A water supply contract 
between the Federal Government and the Washington 
Suburban Sanitary Commission in concert with the Fairfax 
County Water Authority, VA, and the District of 
Columbia has been executed for repayment of all water 
supply costs. The first of 50 annual payments began in 
July 1981. Federally approved water quality standards 
put into effect by Maryland, Virginia, West Virginia, and 
the District of Columbia are considered satisfactory 
assurances of intent to control pollution. Satisfactory 
assurances have been received from Maryland, West 
Virginia, and Virginia that they will protect downstream 
channels from encroachment that would adversely affect 
operation of the project. 
Operations and results during fiscal year. New 
Work: The project became operational for water supply, 
flood control, and for water quality control in July 1981. 
The project was rededicated in May 1987 in honor of 
retired Senator Jennings Randolph of West Virginia. A 
construction claim was paid this year at a cost of $55,000. 
Maintenance: Normal operation and maintenance of the 
project continued. 
28. FOURMILE RUN,VA 
Location. The project is located in the City of Alexandria 
and in Arlington County, VA, on Fourmile Run immediately 
above its confluence with the Potomac River 
at Washington, DC. (See Geological Survey Quadrangle 
sheets for Alexandria, VA, Annandale, VA, Falls Church, 
VA, and Washington West, DC, MD and VA.) 
Existing project. Provides for construction of a floodwall 
protection system, an improved channel, and 
replacement of two highway and four railroad bridges. 
Local cooperation. Requirements are described in full 
on page 4-17 of Fiscal Year 1977 Annual Report. 
Operations and results during fiscal year. New 
Work: Construction contract claim was paid this year 
at a cost of $700,000, fiscally completing the project. 
29. CUMBERLAND, MD, AND 
RIDGELEY, WV 
Location. On North Branch of Potomac River, 21 miles 
upstream from its junction with the South Branch of the 
4-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Potomac River and 197 miles upstream from Washington, 
DC. (See Geological Survey Quadrangles, Frostburg 
and Flintstone, MD, WV, and PA.) 
Existing project. Channel improvements of North 
Branch of Potomac River from the Western Maryland 
Railway bridge in South Cumberland upstream to the 
mouth of Wills Creek, with levees and fill along the left 
bank and levees along the right bank from downstream 
corporate limits of Ridgeley, WV, to a point about 150 
feet above Johnson Street Bridge; channel improvements 
along Wills Creek from its mouth upstream to a point 
in the Narrows about 500 feet upstream from the highway 
bridge on U.S. Highway 40; levee and flood wall in 
West Cumberland, MD, on the left bank of the North 
Branch of the Potomac River from the mouth of Wills 
Creek upstream to Kelly Boulevard; levee and flood wall 
in Ridgeley, WV, on the right bank of the North Branch 
of the Potomac River from Carpenter Avenue upstream 
to Patapsco Street near the upstream corporate limits 
of Ridgeley, WV; interior drainage facilities in Cumberland 
and West Cumberland, MD, and Ridgeley, WV; 
removal of the Chesapeake and Ohio Canal dam and construction 
of a new industrial dam on the North Branch 
of the Potomac River immediately above mouth of Wills 
Creek; and alteration and reconstruction of highway and 
railroad bridges. Federal costs of new work for the completed 
project were $15,633,970, which includes $49,998 
emergency relief funds and is exclusive of $197,513 public 
works acceleration funds. Estimated cost to local interests 
is $2,900,000 of which $1,402,001 is contributed 
funds and $1,497,999 is for lands and damages. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Removal of gravel deposits, grass cutting of 
areas channelward of levees, and removal of brush and 
debris from channel were accomplished as required in 
channel area. 
30. LACKAWANNA RIVER BASIN, PA 
Flood Control Act of 1962 authorized construction of 
Aylesworth Creek Lake, Fall Brook Lake, and local protection 
works on Lackawanna River at Scranton, PA, 
substantially as recommended by the Chief of Engineers 
(S. Doc. 141, 87th Cong., 2d Sess.). The Basin includes 
an area of 346 square miles in northeastern Pennsylvania. 
30A. AYLESWORTH CREEK LAKE, PA 
Location. Project is located in Lackawanna County on 
Aylesworth Creek about one mile above its confluence 
with the Lackawanna River, near the community of East 
Jermyn, PA. 
Existing project. Provides for an earthfill dam with a 
maximum height of 90 feet above streambed and a top 
length of 1,200 feet. The spillway located adjacent to the 
left abutment is an open cut channel 80 feet wide with 
a concrete sill. The outlet works consist of a 3-foot 
diameter uncontrolled conduit. Project controls a 
drainage area of 6.2 square miles and provides flood control 
storage of 1,700 acre-feet equivalent to 5.1 inches of 
runoff from the drainage areas. The lake will extend 
about 4,600 feet and inundate 87 acres when filled to spillway 
crest. Recreation facilities constructed by local 
interest include a bathing beach, bathhouse, and picnic 
area. Federal cost of new work was $2,268,200 of which 
$2,153,559 was for construction and $114,641 for lands 
and damages. In addition $52,200 Federal and $52,200 
non-Federal funds were expended for construction of 
bathhouse facilities under the recreation facilities for 
completed projects program. 
Local cooperation. None required. The Aylesworth 
Creek Reservoir Park Authority, representing the 
Boroughs of Archbald and Jermyn, operate and maintain 
limited day use facilities including a small beach. In 
September 1978 a cost-sharing agreement for construction 
of bathhouse facilities was signed. The cost for the 
facilities which were completed in July 1979 was $104,400 
of which $52,200 was Federal and $52,200 was non- 
Federal. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of the 
project continued. 
31. RAYSTOWN LAKE, RAYSTOWN 
BRANCH, JUNIATA RIVER, PA 
Location. Dam site is on Raystown Branch, about 5.5 
miles upstream from its confluence with Juniata River. 
Project is about 10 miles south of Huntingdon, PA. (See 
Geological Survey Quadrangle sheets, Huntingdon, Mt. 
Union, Broad Top and Everett, PA.) 
Existing project. The rock and earthfill dam rises 225 
feet above streambed with a gated concrete spillway and 
auxiliary spillway in the right abutment. The reservoir 
has a storage capacity of 762,000 acre-feet, of which 
248,000 acre-feet are for flood control, 476,000 acre-feet 
for recreation and water quality control, and the balance 
for sediment reserve. At full flood control pool elevation, 
the reservoir would inundate 10,800 acres and extend 34 
miles upstream. Recreation facilities are provided for 
boating, fishing, camping, swimming, hunting, and 
picnicking. Federal cost for new work was $77,408,700 
of which $46,120,931 was for construction and 
$31,287,769 was for lands and damages including 
relocations. A hydroelectric plant is being constructed 
on the Raystown Lake project and is scheduled to be 
completed May 1988. The construction licensee is 
Allegheny Electric Cooperative, Inc. 
Local cooperation. None required. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of the 
project continued. 
32. SOUTHERN NEW YORK FLOOD 
CONTROL PROJECTS 
Authorized plan provides for construction of reservoirs 
and related flood control works for protection of towns 
in New York and Pennsylvania. The improvements are 
4-12

BALTIMORE, MD DISTRICT 
located in the upper watershed of the Susquehanna River 
to and including the Chemung River. 
32A. ADDISON, NY 
Location. At confluence of Tuscaroroa Creek and 
Canisteo River in the City of Addison, NY. (See Geological 
Survey map for Addison, NY.) 
Existing project. Provides for construction of about 
3,100 feet of earth levee and 700 feet of concrete flood 
wall on the right bank of the Canisteo River, extending 
from high ground on Steuben Street near the Baltimore 
& Ohio Railroad to the mouth of Tuscarora Creek; 
removal of existing dam, mill, and raceway from the 
channel; construction of about 2,200 feet of earth levee 
on the left bank of Tuscarora Creek, extending from Tuscarora 
Street to Canisteo River; construction of 4,600 feet 
of earth levee on the right bank of Tuscarora Creek, extending 
from high ground at the southwest edge of the 
village to high ground at the southeast edge of the village; 
and appurtenant drainage structures. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of the 
project continued. 
32B. ALMOND LAKE, NY 
Location. Dam is located two miles upstream from 
Hornell, NY, on Canacadea Creek, a tributary of the 
Canisteo River. (See Geological Survey map for Hornell, 
NY.) 
Existing project. The dam is an earthfill structure, 
1,260 feet long rising 90 feet above the streambed, with 
a concrete spillway and a gated outlet conduit in the left 
abutment. The outlet works consist of three 5-foot by 
10-foot service gates and three emergency gates of the 
same size. The reservoir has a storage capacity of 14,640 
acre-feet at spillway crest. The project controls a draining 
area of 56 square miles, 36 percent of the watershed 
of the Canisteo River upstream from Hornell, NY. Recreation 
facilities include a boat-launching ramp and dock, 
bathing beach, picnic area, and tent and trailer camping 
area. 
Local cooperation. None required. Local interests have 
developed recreational facilities at the lake in conjunction 
with the Federal Government. These facilities are 
operated and maintained by the Steuben County Board 
of Supervisors. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of project 
continued. 
32C. ARKPORT DAM, NY 
Location. Dam is located five miles upstream from 
Hornell, NY, on the Canisteo River, a tributary of the 
Chemung River which flows into the Susquehanna River. 
(See Geological Survey map for Arkport, NY.) 
Existing project. The dam is an earthfill structure, 
1,200 feet long, exclusive of spilway, rises 113 feet above 
the streambed, with a concrete spillway and an ungated 
outlet in the right abutment. The outlet structure consists 
of an 8-foot diameter reinforced concrete lined conduit, 
660 feet long. A cast iron nozzle is placed in the 
lower end of the conduit, reducing the outlet size to 4 feet 
4 inches. The reservoir has a storage capacity of 7,950 
acre-feet at spillway crest. The project controls a 
drainage area of 31 square miles, 20 percent of the 
watershed of the Canisteo River upstream from Hornell. 
Local cooperation. None required. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of the 
project continued. 
32D. AVOCA, NY 
Location. On the Cohocton River at the Village of 
Avoca, NY, about 30 miles upstream from the confluence 
of the Cohocton and Chemung Rivers. (See Geological 
Survey map for Avoca, NY.) 
Existing project. Provides for improvement and realignment 
of about 8,300 feet of Cohocton River channel, 
extending from above the Erie Railroad to below the 
junction of Main Street and U.S. Highway 15; construction 
of about 8,500 feet of earth levee on left bank of the 
Cohocton River, extending from high ground above 
Alexander Avenue to about 1,300 feet below the junction 
of Main Street and U.S. Highway 15; and 4,500 feet 
of earth levee on the right bank of Salmon Creek, extending 
from high ground above Alexander Avenue to the 
Erie Railroad; a new highway bridge for U.S. Highway 
15 over Cohocton River, raising of the Erie Railroad 
bridge 4 feet; and appurtenant drainage structures. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of the 
project continued. 
32E. BINGHAMTON, NY 
Location. At the confluence of the Chenango and 
Susquehanna Rivers in the City of Binghamton, NY. (See 
Geological Survey map for Binghamton, NY.) 
Existing project. Provides for construction of earth 
levees, concrete flood walls, and appurtenant drainage 
structures, consisting of about 850 feet of channel 
excavation and about 1,375 feet of earth levee along 
Phelps Creek, Town of Port Dickinson; new concrete wall 
on the right bank of the Chenango River, extending 
downstream from high ground near the city limits to an 
existing flood wall below DeForest Street, a distance of 
about 520 feet; about 150 feet of concrete wall just below 
Cutler Dam; about 180 feet of concrete wall at the pumphouse 
near McDonald Avenue; raising existing earth 
levees on the right bank of Chenango River, extending 
from Cutler Dam downstream for about 1,220 feet; about 
2,915 feet of earth levee on the left bank of Chenango 
River north of the city limits in the Village of Port 
4-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Dickinson, extending from Church Street to high ground 
just north of the city line; about 3,900 feet of earth levee 
on the left bank of Chenango River, extending from 
DeForest Street to Cutler Dam; new concrete flood walls 
and riverbank revetment for about 5,570 feet extending 
on the left bank of Chenango River from Cutler Dam to 
the junction with the Susquehanna River; about 540 
feet of new concrete flood wall and raising about 1,085 
feet of concrete flood wall on the right bank of the 
Susquehanna River, extending from the Delaware, Lackawanna 
& Western Railroad downstream to Tompkins 
Street Bridge; about 1,940 feet of earth levee; about 1,940 
feet of concrete flood wall and capping about 125 feet of 
concrete flood wall, on the right bank of the Susquehanna 
River from Stuyvesent Street to mouth of Chenango 
River; about 8,380 feet of earth levee, about 2,180 feet 
of new concrete flood wall and raising about 125 feet of 
existing flood wall on the left bank of the Susquehanna 
River extending from Pierce Creek to high ground at 
State Highway 17; a debris dam and flume between 
Corbett and Hotchkiss Streets and a concrete pressure 
conduit, 1,060 feet long to carry flow of Park Creek from 
Vestal Avenue to the Susquehanna River; about 665 feet 
of levee extending from the Erie Railroad to high ground 
along the right bank of Chamberlain Creek near the 
mouth; closure structures at Erie Railroad and at Court 
Street; a weir, a drop structure, and about 1,800 feet of 
earth levee, about 2,235 feet of channel excavation, about 
645 feet of channel paving and raising, about 470 feet 
of existing concrete flood wall, and about 200 feet of new 
concrete flood wall for improvement of Pierce Creek from 
its mouth to about 1,000 feet above Conklin Avenue; and 
appurtenant drainage structures. Improvement, supplemented 
by authorized flood control dams above the 
area, will provide protection for the City of Binghamton 
against a flood discharge about 20 percent greater than 
the maximum flood of record, which occurred in July 
1935 on the Chenango River and in March 1936 on the 
Susquehanna River. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New Work: 
Plans and specifications for correction of the underseepage 
at the First Ward Area, Front Street Levee were 
completed and the locals have acquired the lands, easements, 
and rights-of-way for construction. Bid opening 
was held in September 1987 and no bids were received. 
Contract will be readvertised. Maintenance: Normal operation 
and maintenance of the project continued. 
32F. CANISTEO, NY 
Location. On Purdy and Bennetts Creeks in the Town 
of Canisteo, NY, situated along the south side of the 
Canisteo River, at the confluence of Bennetts Creek and 
the Canisteo River. (See Geological Survey map for 
Canisteo, NY.) 
Existing project. Provides for construction of about 
8,000 feet of earth levees on the right bank of the 
Canisteo River, extending from high ground 1,570 feet 
west of State Highway Route 21 above the Town to a 
point at the intersection of Ordway Lane and East Main 
Street; about 7,400 feet of earth levee on the left bank 
of Purdy and Bennetts Creeks, extending from the Main 
Street Bridge to high ground above Greenwood Street; 
1,000 feet of earth levee on the right bank of Bennetts 
Creek extending upstream from the Main Street Bridge; 
a concrete check dam with wing levees from Greenwood 
Street; a new highway bridge at Greenwood Street; 
alterations to existing timber check dams in Bennetts 
Creek; channel excavation in Bennetts and Purdy Creeks; 
and appurtenant drainage structures. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of the 
project continued. 
32G. CORNING, NY 
Location. On the Chemung River in the City of Corning, 
NY, about 44 miles upstream from the confluence 
of Chemung River and North Branch of Susquehanna 
River. (See Geological Survey map for Corning, NY.) 
Existing project. Flood protection for this community 
was originally authorized by the Flood Control Act of 
1936. Plan of improvement provides for construction of 
a pumping station, earth levees, and concrete flood walls, 
consisting of: about 4,300 feet of earth levee, enlargement 
of about 8,610 feet of existing earth levee and 
about 3,100 feet of concrete flood wall on the right bank 
of the Chemung River, extending from the Erie Railroad 
Bridge to high ground at Park Avenue below the City; 
about 200 feet of concrete flood walls; about 2,500 feet 
of earth levees and enlargement of about 11,500 feet of 
existing earth levee on the left bank of the Chemung and 
Cohocton Rivers, extending from the Erie Railroad 
Bridge over Cohocton River to the mouth of Post Creek; 
about 2,500 feet of earth levee and enlargement of about 
4,700 feet of existing earth levee on the right bank of Post 
Creek from its mouth to Watkins Street; realignment of 
about 3,000 feet of channel, about 8,800 feet of earth 
levee, about 3,000 feet of channel excavation, a pressure 
conduit about 400 feet long, a drop structure and a weir 
for improvement of Cutler Creek, extending from its 
mouth to high ground at Deckertown Road and Hornby 
Road; and appurtenant drainage structures. Flood protection 
on Monkey Run was authorized by the Flood 
Control Act of 1950. Plan of improvement provides for 
construction of 2,010 feet of open flume, 2,320 feet of 
pressure conduit storm sewers, and appurtenant facilities 
between the existing improved channel above Sixth 
Street and the Chemung River at a point immediately 
east of Pine Street East. Modified improvement will provide 
protection for the City of Corning against a flood 
discharge in Chemung River approximately equal to the 
maximum flood of record, which occurred in May 1945, 
and on tributary streams against floods of greater 
magnitude than known to date. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Normal operaton and maintenance of the project 
continued. 
4-14

BALTIMORE, MD DISTRICT 
32H. EAST SIDNEY LAKE, NY 
Location. Dam is located near East Sidney, NY, on the 
Ouleout Creek, about five miles above the confluence of 
the creek with the Susquehanna River. (See Geological 
Survey map for Franklin, NY.) 
Existing project. The dam is an earthfill and concrete 
structure, 2,010 feet long, including spillway, rises 130 
feet above the streambed and consists of a concrete 
gravity-type section with a compacted earth-dike section 
at the right abutment. The outlet works consist of five 
rectangular conduits each 3.5 feet by 5.85 feet and 105 
feet long. The reservoir has a storage capacity of 33,500 
acre-feet at spillway crest. The project controls a 
drainage area of 102 square miles which is 93 percent of 
the Ouleout Creek drainage area, and 5 percent of the 
watershed of the Susquehanna River upstream from 
Binghamton, NY, exclusive of the separately controlled 
Chenango River. Recreation facilities include a bathing 
beach, picnic and camping areas, and boat-launching and 
docking facilities. 
Local cooperation. None required. The Town of Sidney, 
NY, cooperated in the development of recreation facilities 
and operates and maintains.all the facilities with the 
exception of the recreational pool, which is the responsibility 
of the Federal Government. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of the 
project continued. 
321. ELMIRA, NY 
Location. On the Chemung River in the City of Elmira, 
NY, about 27 miles upstream from the confluence of the 
Chemung River and North Branch of Susquehanna 
River. (See Geological Survey map for Elmira, NY.) 
Existing project. Provides for about 17,700 feet of 
earth levees, and about 4,100 feet of concrete flood wall 
on the right bank of the Chemung River, extending from 
South Hoffman Street to a point below the city near the 
upper end of Big Island; about 12,100 feet of earth levee 
and about 6,300 feet of concrete wall on the left bank of 
the Chemung River extending from Durland Avenue to 
the Delaware, Lackawanna & Western Railroad at the 
mouth of Newton Creek; about 10,000 feet of earth levee 
on right bank of Newton Creek, extending from about 
the intersection of Delaware, Lackawanna & Western 
Railroad and East Church Street to high ground near 
intersection of Sullivan and Warren Streets; about 4,300 
feet of earth levee on the right bank of Divan Creek; 
about 2,000 feet of concrete conduit enclosing Hoffman 
Brook from West Second Street to the Chemung River; 
clearing islands and riverbanks of trees and brush for 
about 3.5 miles in the Chemung River; about 14,300 feet 
of earth levee on the left bank of Seely Creek, extending 
from the Erie Railroad to high ground approximately 
1,000 feet northwest of the intersection of South Broadway 
and Pennsylvania Avenue; a pumping plant for disposal 
of interior drainage; an interceptor sewer about 
6,000 feet long varying in size from 48 to 96 inches in 
diameter; and appurtenant structures. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of the 
project continued. 
32J. HORNELL, NY 
Location. On the Canisteo River in the City of Hornell, 
NY, about 42 miles upstream from the confluence of the 
Canisteo and Tioga Rivers. (See Geological Survey map 
for Canisteo, NY.) 
Existing project. Provides for channel realignment and 
earth levees, concrete flood walls, and check dams consisting 
of: realignment of about 4,600 feet of the 
Canisteo River channel, and about 5,800 feet of earth 
levee on its right bank, extending from Seneca Street upstream 
to the junction of the Pittsburgh, Shawmut & 
Northern Railroad and the Erie Railroad; about 4,500 feet 
of earth levee, extending on both sides of Seneca Street 
from the Canisteo River to Wrightman Avenue and the 
junction of Cleveland Avenue and Bethesda Drive; about 
7,200 feet of earth levee, about 2,500 feet of concrete flood 
wall, and raising about 1,500 feet of existing concrete 
flood wall, on the right bank of the Canisteo River, and 
about 12,000 feet of channel improvement, extending 
from Seneca Street to the Erie Railroad; about 2,500 feet 
of earth levee, about 2,100 feet of concrete flood wall on 
the left bank of the Canisteo River extending from a point 
opposite Walnut Street to the Erie Railroad; a ring-earth 
levee about 2,800 feet long around the sewage-disposal 
plant on the left bank of the Canisteo River; about 4,500 
feet of realignment and improvement of the Canisteo 
River Channel with about 4,500 feet of earth levee on its 
right bank extending from Cedar Street downstream to 
about 1,400 feet above East Avenue; about 2,400 feet of 
channel paving, 1,400 feet of earth levee, raising about 
1,900 feet of concrete flood wall, and construction of one 
check dam on Canacadea Creek; about 1,600 feet of 
channel paving and construction of three check dams on 
Chauncey Run with about 300 feet of new wall and about 
300 feet of capping; a weir, a check dam, 3,030 feet of 
channel paving, 4,800 feet of flood walls and levees, and 
related work on existing walls, on Crosby Creek; removal 
of 6 bridges, erection of 4 bridges, miscellaneous bridge 
structures, and 3 drop structures; and appurtenant 
drainage structures and small stream control works. 
Improvement, supplemented by Arkport and Almond 
Reservoirs above the area, provides protection for the 
City of Hornell against a flood discharge approximately 
double the maximum flood of record, which occurred in 
July 1935. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of the 
project continued. A contract was awarded in September 
1987 to remove the concrete weir at Cedar Street. 
Removal of the weir will help regain the original channel 
flow capability. 
4-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
32K. LISLE, NY 
Location. On the Tioughnioga River in the Village of 
Lisle, NY, about 12 miles upstream from the confluence 
of the Tioughnioga and Chenango Rivers. (See Geological 
Survey map for Lisle, NY.) 
Existing project. Provides for channel realignment and 
construction of earth levees and concrete flood walls, consisting 
of: relocation of about 3,000 feet of Dudley Creek 
Channel, extending from 1,200 feet west of the intersection 
of Cortland and Main Streets to the confluence with 
Tioughnioga River, realignment of some 5,700 feet of 
Tioughnioga River Channel east of the Village; about 
4,150 feet of earth levee and 970 feet of concrete wall on 
the right bank of Dudley Creek and Tioughnioga River; 
realignment of some 5,700 feet of Tioughnioga Street to 
the railroad crossing on River Street; raising about 1,860 
feet of the Delaware, Lackawanna & Western single track 
railroad over the levee; relocation of about 1,600 feet of 
Cortland Street; a new bridge over relocated Dudley 
Creek; and appurtenant drainage structures. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of the 
project continued. 
32L. OXFORD, NY 
Location. On the Chenango River in the Village of 
Oxford, NY, about 40 miles upstream from the confluence 
of the Chenango and Susquehanna Rivers. (See 
Geological Survey map for Oxford, NY.) 
Existing project. Provides for earth levees and clearing 
of Chenango River Channel, consisting of about 2,100 
feet of earth levees on the left bank of the Chenango 
River, extending from high ground near Cemetery Drive 
and running mostly along the railroad to high ground 
near Main Street; removal of dam and island below Main 
Street; raising the Delaware, Lackawanna & Western 
Railroad over the levee; and appurtenant closure and 
drainage structures. Improvement provides protection 
for the Village of Oxford on the left bank against a flood 
discharge substantially larger than the maximum flood 
of record, which occurred in July 1935. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of the 
project continued. 
32M. WHITNEY POINT LAKE, NY 
Location. Dam is located near Whitney Point, NY, on 
the Otselic River about 0.7 mile upstream from its confluence 
with Tioughnioga River. (See Geological Survey 
map for Whitney Point and Willet, NY.) 
Existing project. The dam is an earthfill structure, 
4,900 feet long, exclusive of a spillway, rises 95 feet above 
the streambed, with a concrete spillway and gated outlet 
in the left abutment. The outlet works consist of three 
5-foot by 10-foot gates and one emergency gate of the 
same size. The reservoir has a storage capacity of 86,440 
acre-feet at spillway crest. The project controls a 
drainage area of 255 square miles, the entire watershed 
of Otselic River, or 16 percent of the Chenango River 
watershed upstream from Binghamton, NY. Recreation 
facilities, constructed in cooperation with local interests, 
provide for swimming, picnicking, camping, boating, fishing, 
and hunting. 
Local cooperation. None required. Local interests operate 
and maintain all of the recreation facilities. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of the 
project continued. 
32N. WHITNEY POINT VILLAGE, NY 
Location. On the Tioughnioga River at the confluence 
of the Tioughnioga and Otselic Rivers, tributaries of the 
Susquehanna River. (See Geological Survey map for 
Whitney Point, NY.) 
Existing project. Provides for channel realignment and 
earth levees, consisting of realignment of about 1,800 feet 
of Tioughnioga River Channel, above the confluence with 
Otselic River; about 7,100 feet of earth levee along the 
right bank of the Tioughnioga River, extending from high 
ground on Main Street above the village to Collins Street 
just below the Village; and appurtenant drainage 
structures. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of the 
project continued. 
33. STILLWATER LAKE 
LACKAWANNA RIVER, PA 
Location. Dam is on the Lackawanna River, 39 miles 
from the mouth of the stream and about 4 miles upstream 
from Forest City, Susquehanna County, PA (See Geological 
Survey Quadrangle sheet, Honesdale, PA.) 
Existing project. Dam is earthfill type, rising 77 feet 
above the streambed, with a controlled outlet conduit and 
side channel spillway in the left abutment. Reservoir 
capacity is 12,000 acre-feet, of which 11,600 acre-feet is 
flood control storage and the remainder utilized to maintain 
the existing water supply reservoir for Forest City, 
PA, at this site. Reservoir area is 422 acres,and the pool 
extends about 2.1 miles upstream. Reservoir controls 52 
percent of the watershed above Carbondale, 26 percent 
above Olyphant, and 17 percent above Scranton. Federal 
cost of new work, completed in 1965, was $5,725,700 of 
which $4,500,500 was for construction and $1,225,200 
was for lands and damages. 
Local cooperation. None required. Section 2, Flood Control 
Act of June 28, 1938, applies. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of project 
continued. 
4-16

BALTIMORE, MD DISTRICT 
34. SUSQUEHANNA RIVER FLOOD 
CONTROL PROJECTS, NY AND PA 
Plan of improvement authorized by the 1958 Flood 
Control Act provides for construction of Cowanesque 
Lake, PA, Tioga-Hammond Lakes, PA, local protection 
works at Elkland, PA, and Nichols, NY, and channel 
improvements at Cortland, NY. This project plan supplemented 
the comprehensive flood control program for 
Southern New York and Northern Pennsylvania which 
included the Southern New York flood control project 
and Stillwater, Genegantslet, and South Plymouth 
Reservoirs. 
34A. COWANESQUE LAKE, PA 
Location. Dam is on the Cowanesque River about 2.2 
miles above its confluence with Tioga River at Lawrenceville, 
PA. (See Geological Survey map for Tioga, PA.) 
Existing project. The project constructed under the 
Flood Control Act of 1958 provides for an earthfill dam 
3,100 feet long and rising 151 feet above the streambed, 
an uncontrolled spillway in the right abutment, a gated 
conduit in the Valley floor, and flood control storage is 
82,000 acre-feet. Relocation of the Town of Nelson to a 
new townsite was authorized by Section 121 of the Water 
Resources Development Act of 1976. The Federal cost 
of this new work was $106,030,700 of which $61,743,600 
was for construction and $44,287,100 was for lands and 
damages and relocations (which includes $5,755,000 for 
relocation of the Town of Nelson). Within the discretionary 
authority of the Chief of Engineers the project was 
modified in March 1983 in accordance with the Water 
Supply Act of 1958, as amended, and the Flood Control 
Act of 1944, as amended. The modification provides for 
reallocating 25,600 acre-feet of present flood control 
storage for water supply storage by raising the permanent 
pool from elevation 1,045 to 1,080 mean sea level. 
Other features include modifying the existing intake 
tower and two access ramps, stabilizing the reservoir 
slope near the relocated Town of Nelson, replacing 
existing day-use recreation facilities, and expanding both 
day-and overnight-use recreation facilities to accommodate 
an expected increase in annual visitation due to the 
larger pool. Estimated cost (October 1986) of the modification 
is $53,114,000 of which $970,000 is Federal (for 
expanded recreation facilities) and $52,144,000 is non- 
Federal (which includes $39,414,000 for reimbursement 
of the cost of existing flood control storage reallocated 
to water supply storage, $11,760,000 cash contribution 
for the water supply modification, and $970,000 cash contribution 
for expanded recreation facilities). 
Local cooperation. The Water Resources Development 
Act of 1976, which authorized relocation of the Town of 
Nelson, provides that before the Secretary of the Army 
acquires any real estate property for the new townsite, 
appropriate non-Federal interests shall furnish binding 
contractual commitments that all lots in the new townsite 
will be either occupied when available, replacements 
for open space and vacant lots in the existing town, or 
will be purchased by non-Federal interests at the fair 
market value. The required contractual agreement for 
local cooperation was executed with Nelson Township on 
August 25, 1977. The March 1983 project modification 
(discussed above) requires non-Federal interests repay 
100 percent of the investment cost of project modifications 
allocated to water supply, to terrestial wildlife 
habitat mitigation, and to in-kind replacement recreation, 
plus the allocated share of the project's original cost 
(escalated to current price levels). Additionally, they are 
required to pay annual costs of operation, maintenance, 
and major replacements allocated to water supply and 
to provide 50 percent of the cost of expanded recreation 
facilities, as well as, all operation, maintenance, and 
replacement costs for the expanded facilities. Water 
supply and recreation contracts were executed by the 
Assistant Secretary of the Army (Civil Works) and the 
Susquehanna River Basin Commission on June 30, 1986. 
Operation and results during fiscal year. New Work: 
Modification to relocate the Town of Nelsonconstruction 
claim was paid at a cost of $170,000, fiscally 
completing the project. Modification of Cowanesque 
Lake: Contracts were awarded for the slope modification 
and tower and access ramp modification. Cultural and 
historical work progressed as well as continuing engineering 
and design of the remaining plans and specification 
packages. Maintenance: Normal operation and maintenance 
of the project continued. 
34B. TIOGA-HAMMOND LAKES, PA 
Location. The dams are located in Tioga County, PA, 
upstream from the confluence of the Tioga River and 
Crooked Creek. Tioga Dam is located on the Tioga River 
and Hammond Dam on Crooked Creek, approximately 
opposite the Tioga damsite, about 3.3 miles above its 
mouth and less than one mile from the Village of 
Brooklyn. (See Geological Survey map for Tioga, PA.) 
Existing project. Tioga Dam is 2,600 feet long, rising 
140 feet above the streambed, with a controlled outlet 
conduit. Hammond Dam is 5,900 feet long, and has a 
maximum height of 121.5 feet above the streambed, with 
a concrete spillway. Both dams are of earth and rockfill 
construction. The Tioga-Hammond Lakes project controls 
a total drainage area of 402 square miles, with Tioga 
Dam controlling 280 square miles of the Tioga River 
Basin and Hammond Dam controlling 122 square miles 
of the Crooked Creek Basin. Recreation facilities are 
provided for swimming, camping, picnicking, boating, 
and fishing. Estimated Federal cost (October 1986) of 
new work is $193,120,000 of which $125,029,000 is for 
completed construction, $60,591,000 is for lands and 
damages and relocations and $7,500,000 is for construction 
of the Mill Creek recreation facilities. 
Local cooperation. None required on the completed 
portion of the project; however, construction of the Mill 
Creek Area recreation facilities relies on local interests 
providing specialized facilities including buildings, 
lodges, demonstration centers, and non-water oriented 
equipment and accepting full responsibility for operation 
and maintenance of the entire recreation area. 
4-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Operations and results during fiscal year. New Work: 
Planning for the joint development of the Mill Creek 
Recreation Area continued by the Baltimore District and 
Mansfield University including preparation of plans and 
specifications for construction of the Federal project. 
Progress was slowed down due to non-Federal sponsor 
lack of funds. Non-Federal sponsor is having a fund raising 
campaign. Maintenance: Normal operation and maintenance 
of the project continued. 
35. WEST BRANCH OF 
SUSQUEHANNA RIVER, PA 
A system of three flood control reservoirs, in the headwaters 
of the West Branch Susquehanna River, PA, are 
known as Curwensville, Alvin R. Bush (formerly known 
as Kettle Creek) and Foster Joseph Sayers (formerly 
known as Blanchard) on the West Branch about 2.5 miles 
upstream from Curwensville, PA; on Kettle Creek 8.4 
miles above the mouth and 17 miles upstream from 
Renovo, PA; and on Bald Eagle Creek about one mile upstream 
from Blanchard, PA, respectively. 
In accordance with the terms of local cooperation, the 
Commonwealth of Pennsylvania furnished assurances 
that it will coordinate operation of George B. Stevenson 
Reservoir (formerly known as First Fork Reservoir) with 
operation of Curwensville, Alvin R. Bush, and Foster 
Joseph Sayers Reservoirs to secure optimum flood 
control benefits from system operation. George B. 
Stevenson Reservoir on the First Fork Sinnemahoning 
Creek in Cameron and Potter Counties, PA, was constructed 
by the Commonwealth of Pennsylvania at a first 
cost of $12,240,000 and an estimated $30,000 annually 
for operation and maintenance. 
35A. ALVIN R. BUSH DAM, PA 
Location. Alvin R. Bush Dam (formerly Kettle Creek 
Dam) is located on Kettle Creek about 8.4 miles above 
the mouth and 15 miles upstream from Renovo, PA. (See 
Geological Survey map for Keating, PA.) 
Existing project. Dam is an earthfill structure,about 
1,350 feet long, rises 165 feet above the streambed, with 
an uncontrolled spillway located in rock adjacent to the 
right abutment, and has a horseshoe-shaped outlet tunnel 
with 3 service gates. The reservoir has a storage capacity 
of 75,000 acre-feet at spillway crest. The project controls 
a drainage area of 226 square miles or about 92 percent 
of the Kettle Creek watershed. 
Local cooperation. None required. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of the 
project continued. 
35B. CURWENSVILLE LAKE, PA 
Location. Dam is on the West Branch of the Susquehanna 
River approximately 2.5 miles upstream from 
Curwensville, Clearfield County, PA. (See Geological 
Survey map for Curwensville, PA.) 
Existing project. Dam is an earthfill structure, about 
1,850 feet long, rises 131 feet above the streambed, and 
has an open-cut concrete sill 1,750 feet from the left 
abutment. The outlet works, located in the left abutment, 
consist of a 15-foot diameter circular outlet conduit with 
3 slide control gates 5.5 feet wide and 12 feet high. The 
reservoir has a storage capacity of 124,200 acre-feet at 
spillway crest. The project controls a drainage area of 
365 square miles, or about 98 percent of the West Branch 
Susquehanna River at Curwensville and about 75 percent 
at Clearfield. Recreation facilities include a seasonal 
recreational pool of 790 acres, access roads, parking 
areas, beach area, boat dock, and launching ramp. 
Local cooperation. None required. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of project 
continued. 
35C. FOSTER JOSEPH SAYERS DAM, PA 
Location. Dam is located on Bald Eagle Creek in Centre 
County, PA, about one mile upstream from Blanchard 
and about 14 miles above the confluence of Bald Eagle 
Creek with the West Branch Susquehanna River at Lock 
Haven, PA. (See Geological Survey map for Howard, 
PA.) 
Existing project. Dam is an earthfill structure, about 
6,835 feet long, rises 100 feet above the streambed, and 
has an open-cut concrete chute and uncontrolled concrete 
weir 600 feet wide located in rock in a saddle adjacent 
to the left abutment. The outlet works, located in the left 
abutment, consist of a 15-foot diameter circular outlet 
conduit with two hydraulically-operated wheel gates 7 
feet wide and 15 feet high. The reservoir has a storage 
capacity of 99,000 acre-feet at spillway crest. The project 
controls a drainage area of 339 square miles or 88 percent 
of the drainage area above Beech Creek and 43 percent 
of the Bald Eagle Creek drainage area. Recreation 
facilities include a summer recreation pool of 1,730 acres, 
a conservation pool of 630 acres for the preservation of 
fish life, access roads, parking areas, boat docks and 
launching ramps, and camping areas. 
Local cooperation. None required. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of the 
project continued. 
36. FRANCIS E. WALTER DAM, PA 
Location. Reservoir is in northeastern Pennsylvania on 
Lehigh River between White Haven and Stoddartsville. 
Dam is about 0.4 mile below mouth of Bear Creek, about 
60 miles above confluence of Lehigh River and Delaware 
River at Easton, PA. (See Geological Survey Quadrangle 
Sheet, Stoddartsville, PA.) 
Existing project. Plan of improvement authorized by 
1946 Flood Control Act (H. Doc 587, 79th Cong. 2d Sess.) 
provided for a single-purpose flood control reservoir. 
4-18

BALTIMORE, MD DISTRICT 
Modification of project, authorized by 1962 Flood Control 
Act (H. Doc. 522, 87th Cong., 24 Sess.), provides for a 
multiple-purpose development for water supply and 
recreation in addition to present single-purpose flood control 
project. Plan of improvement requires altering spillway, 
increasing height of dam, extending outlet tunnel 
by addition of a concrete conduit, and constructing new 
dikes and raising existing dikes. Modified dam will rise 
264 feet above riverbed and be 3,500 feet long. Reservoir 
modification, a unit of comprehensive plan for flood 
control and other purposes of Delaware River Basin, 
will have a reservoir capacity of 181,000 acre-feet spillway 
crest level with 3,000 acre-feet of inactive storage, 
70,000 acre-feet for water supply and recreation and 
108,000 acre-feet for flood control. Estimated Federal 
cost of new work (October 1987) is $124,000,000 including 
$112,100,000 required non-Federal reimbursement for 
costs allocated to water supply storage during life of 
project after use of this storage is initiated. Project as 
authorized under the 1946 Flood Control Act was completed 
June 1961. Settlement for lands was completed 
October 1962. The advance engineering and design for 
the modified project is complete. 
Local cooperation. None required under 1946 Flood 
Control Act. Under 1962 Flood Control Act, project was 
approved subject to certain requirements by local 
interests, as defined in House Document 522 cited above. 
The Delaware River Basin Commission reiterated its 
sponsorship for the modified project in October 1985. 
Operations and results during fiscal year. New 
Work: Engineering and design continued on the project 
modification. The Geology, Soils, Embankment FDM 
and Real Estate FDM were approved this year with the 
Outlet Works Tower FDM submitted for approval. 
37. TAMAQUA, PA 
Location. The authorized project is located in Tamaqua 
Borough and Walker Township, Pennsylvania. Both 
municipalities are within Schuylkill County. 
Existing project. The project as authorized provides 
for a 2,930-foot long tunnel, 10 feet in diameter with appurtenant 
structures, through Sharp Mountain. The 
tunnel would extend from Wabash Creek on the west 
boundary of Tamaqua to the Little Schuylkill River just 
south of its confluence with Wabash Creek. The proposed 
improvement includes an intake structure, a stilling 
basin, and a 70-foot long highway bridge. The Phase I 
portion of the advance engineering and design was completed 
in 1981. The findings from that phase resulted in 
the addition of a small dry detention dam to the project 
plan. Phase II of advance engineering and design was 
completed in 1984 and reduced the level of protection to 
100-year. This reduced the tunnel's diameter to 9 feet. 
Estimated cost of project (October 1987) is $11,7.0,000 
including $2,925,000 required non-Federal costs. The 
local sponsor, by letter of October 2, 1985, requested the 
project be constructed in two stages. It was also requested 
that the tunnel be constructed first followed by 
the dam. Estimated cost of tunnel only project (October 
1987) is $8,740,000 including $2,185,000 required non- 
Federal costs. 
Local cooperation. The Borough of Tamaqua is the 
local sponsor. The Borough, by letter of June 25, 1968, 
indicated its intention to comply with the items of local 
cooperation. The assurance was reaffirmed by the 
Borough on September 2, 1977, September 2, 1980, and 
again on October 2, 1985. 
Operations and results during fiscal year. New Work: 
Contracted with architect-engineer to separate tunnel 
contract documents from combined tunnel and dam 
documents. Continued coordination with local sponsor 
towards developing a financial plan and draft Local 
Cooperation Agreement. 
38. WYOMING VALLEY, PA 
Location. The project is located in Luzerne County, PA, 
on the Susquehanna River. The project area is limited 
to the four existing Federal flood control projects. These 
levee improvements are in Plymouth, Kingston- 
Edwardsville, Swoyersville-Forty Fort, and Wilkes-Barre 
and Hanover Township. 
Existing project. The four projects were constructed 
during the period 1935 through 1976 and consist of levee, 
sheet piling, flood wall, and associated interior drainage 
structures along both banks of the Susquehanna River 
which provide flood control benefits estimated at $46.1 
million annually. Remedial measures to protect against 
levee failure under future high discharge conditions consist 
of: weighted filter drains on the landside of the 
levees to protect against erosion due to seepage in certain 
areas; stability berms and toe protection on the riverside 
of the levees in certain areas to stabilize the riverbank 
and protect against erosion due to river flows; stabilization 
of sheet piling in certain areas; and additional relief 
wells to control the underseepage in other areas. 
Local cooperation. Lands and relocations for construction 
of the existing projects at an estimated cost of 
$1,000,000 were provided by the Boroughs of Kingston, 
Edwardsville, Plymouth, the City of Wilkes-Barre, 
Hanover Township, and Luzerne County. These entities 
also operate and maintain the existing projects. Updated 
assurances were obtained during preparation of the 
General Design Memorandum. Additional local costs in 
connection with the proposed remedial work are expected 
to be minor. 
Operations and results during fiscal year. New 
Work: Phase II construction was completed in May 
1987. Phase I was completed in September 1986. Completion 
of the Phase II work concluded the overall construction 
of the project. 
39. YORK, INDIAN ROCK DAM, PA 
Location. On Codorus Creek 10 miles above its confluence 
with the Susquehanna River. Codorus Creek has 
tributary branches in York County in the south and 
central parts of Pennsylvania. (See Geological Survey 
Quadrangle sheets, Pennsylvania-York and Hanover.) 
4-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Existing project. Indian Rock Dam is an earth and 
rockfill dam about 1,000 feet long at the top, rising 83 
feet above the streambed, with a reservoir providing for 
control storage of 28,000 acre-feet. Dam is on the main 
branch of Codorus Creek about 3 miles above York. Outlet 
works are in the right abutment and the uncontrolled 
spillway is on the right bank. Reservoir will control entire 
drainage area of the main branch of Codorus Creek 
and 41 percent of the drainage area above York. Improvements 
in Codorus Creek in the vicinity of and through 
the City of York provide for 22,969 feet of channel extending 
from 300 feet above Richland Avenue to a point 
downstream from the Pennsylvania Railroad crossing 
known as Black Bridge. Improvements, which will increase 
channel capacity to 24,000 cubic feet per second, 
include widening and deepening the channel, bank protection, 
removal of York Roller Mill Dam, and a low water 
channel about 3,900 feet long in the vicinity of York 
Roller Mill Dam. Cost of new work for the completed 
project was $5,061,167, of which $4,566,446 (regular 
funds) and $11,588 (emergency relief funds) were for construction 
and $483,133 (regular funds) was for lands and 
damages. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, applies. 
Operations and results during fiscal year. Maintenance: 
Normal operation and maintenance of the 
project continued. 
40. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Projects in New York, Pennsylvania, Maryland, 
District of Columbia, and Virginia were inspected during 
the period by hired labor. See Table 4-I. 
41. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Operations and results during fiscal year. The operation 
of George B. Stevenson Dam, PA, was coordinated 
with the operation of Alvin R. Bush, Curwensville, and 
Foster Joseph Sayers Dams in the West Branch Susquehanna 
River Basin in order to secure optimum flood control 
benefits from the system operation. Costs during the 
period were $37,583. 
Supplemental instructions for the operation of Savage 
River Dam, MD, were provided, during periods of high 
water, to insure maximum protection for downstream 
localities. Costs during the period were $42,850. 
42. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency flood control activities-repair, flood fighting, 
and rescue work (Public Law 99, 84th Congress, and 
antecedent legislation). 
Cost for the period was $561,507 of which $289,891 was 
for Disaster Preparedness Program, and $271,616 was 
for Rehabilitation and Emergency operations. 
Flood control activities pursuant to Section 205, Public 
Law 858, 80th Congress, as amended (pre-authorization). 
Fiscal year costs were $69,783 for Conklin-Kirkwood 
NY. Non-structural study for Conklin-Broome (Ice Jam) 
NY; $19,754 for Hyndman, PA; $7,352 for Tunkhannock 
Creek, Tunkhannock, PA; and $30,953 for Hills Point 
Rd., MD; $76,080 for Gwynns Falls, Baltimore, MD; 
$9,337 for Isle of Wight Bay, Ocean City, MD; $11,736 
for Spring Brook Creek, Pittston Township, PA; and 
$9,446 for Potomac River, Sportsmans, Berkeley, WV. 
Water Supply 
43. WASHINGTON AQUEDUCT 
Location. The diversion dam and raw water supply intakes 
at Great Falls, the two collecting conduits, part of 
Dalecarlia receiving reservoir, the booster pumping station 
and the Little Falls raw water pumping station are 
located in Maryland. All other structures of the water 
supply system including parts of the raw water collecting 
system, two purification plants, pumping stations, 
storage reservoirs, and transmission mains are in the District 
of Columbia. Federal owned water mains are maintained 
in Virginia and Maryland. 
Existing project. Control of the water supply system 
is vested in Chief of Engineers (See Acts of March 3, 
1859, and March 2, 1867, November 22, 1973 and Sec. 
1800 of Revised Statutes). The project includes: administration; 
operation and maintenance of the collection, 
purification, pumping, and transmission facilities; protection 
of the water supply system; engineering; and construction 
of major water system additions and 
improvements. 
Authority to supply water to Arlington County, the 
City of Falls Church, and other jurisdictions in Virginia 
is contained in Public Law 119, 69th Congress, approved 
April 14, 1926; and Public Law 118, 80th Congress, June 
26, 1947. 
Local cooperation. Requirements are described in full 
on page 4-19 of the Fiscal Year 1981 Annual Report. 
Operations and results during fiscal year. An uninterrupted 
and adequate supply of purified water was 
furnished to the District of Columbia; Arlington County, 
and Falls Church, VA; and to Federal establishments in 
the District of Columbia, Arlington County, VA and 
Montgomery and Prince Georges Counties in Maryland. 
Total consumption for Fiscal Year 1987 was 71,958 
million gallons; the maximum daily consumption was 276 
million gallons and average daily consumption was 197 
million gallons. The average amount furnished Arlington 
pCeoru dnatyy . aTnhde FCaollrsp sC ohfu Ercnhg, iVneAe rws aws a4s1 r.2e immbilulirosne dg ainll otnhse 
amount of $5,699,941 fo r furnished to the Virginia 
communities by the Washington Aqueduct. 
The treated water delivered to the 1.1 million consumers 
served by the Washington Aqueduct met or surpassed 
all Water Quality standards promulgated by the 
U.S. Environmental Protection Agency under the Safe 
Drinking Water Act (P.L. 93-523.) 
4-20

BALTIMORE, MD DISTRICT 
General Investigations 
44. SURVEYS 
Federal costs for the fiscal year were $1,183,478 of 
which $828,628 was for flood damage prevention studies, 
$105,112 for shoreline protection studies, $42,166 for 
special studies, $80,000 for special investigations, and 
$127,572 for coordination with other agencies and non- 
Federal interests. 
Non-Federal contributed costs for the fiscal year were 
$38,567 for shoreline protection studies. 
45. COLLECTION AND STUDY OF 
BASIC DATA 
Costs for flood plain management activities and 
general planning guidance during the period was 
$246,678. Providing assistance and guidance to local 
interests on methods and procedures for preventing 
and reducing flood damages was in progress at end of 
fiscal year. 
46. PRE-CONSTRUCTION ENGINEERING 
AND DESIGN 
Susquehanna Basin at Harrisburg, PA-The authorized 
project provides for an impervious railroad embankment/
floodwall line of protection 3,800 feet long, a pump 
station and floodgates for interior drainage, a dry detention 
dam along Asylum Run (a small tributary of Paxton 
Creek), an enlarged earth and concrete channel for Paxton 
Creek about 4 miles long, and minor recreation and fish 
and wildlife facilities. Preparation of a General Design 
Memorandum continued during the fiscal year. Estimated 
planning and engineering cost is $4,600,000. Total 
costs during the fiscal year were $523,582. 
Lock Haven, PA-The authorized project provides for 
36,600 feet of levee, 1,000 feet of flood wall, five closure 
structures, one pumping station, non-structural flood 
control measures for Woodward Township, and minor 
recreation facilities. Preparation of a Phase II General 
Design Memorandum continued during the fiscal year. 
Estimated planning and engineering cost is $3,881,000. 
Total costs during the fiscal year were $843,733. 
Wyoming Valley, PA (Levee Raising)-The authorized 
project provides for raising the existing levees and flood 
walls between 3 and 5 feet, modifying closure structures, 
relocating utilities, and providing some new flood walls 
and levees to maintain the system's integrity. The plan 
also includes raising four other local protection projects, 
removing an abandoned railroad bridge, and providing 
non-structural measures to mitigate any significant induced 
damages and the potential of a catastrophic failure 
of an existing project. Preparation of a Phase II General 
Design Memorandum continued during the fiscal year. 
The estimated planning and engineering cost is 
$7,700,000 and costs during the fiscal year were 
$721,347. 
Atlantic Coast of Maryland & Assateague Island, 
VA-The authorized project provides for constructing 
a steel sheet pile bulkhead about 1.8 miles, and constructing 
a sand dune about 6.3 miles for hurricane protection. 
Preparation of a combined General Design Memorandum 
continued during the fiscal year. The estimated planning 
and engineering cost is $2,600,000 and costs during the 
fiscal year were $620,722. 
Francis E. Walter Dam, PA-(Modification)-The 
authorized project would provide for modifying the 
existing single purpose flood control project by raising 
the existing dam 30 feet thereby adding water supply and 
recreation purposes. Pre-construction planning was completed 
at a total cost of $5,688,000. Total costs during 
the fiscal year were $175,936. 
Washington, DC & Vicinity-The authorized project 
would provide for raising the grade of a portion of P 
Street, filling an area near the Lincoln Memorial (along 
23rd Street) regrading the area adjacent to 17th Street 
and constructing a removable closure structure across 
17th Street. These measures were authorized to restore 
the design level of protection of the existing project and 
to reduce the need for emergency closure in the event of 
a flood. Preparation of a combined General Design 
Memorandum continued during the fiscal year and total 
costs were $412,768. Estimated preconstruction planning 
cost is $2,300,000. 
4-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 4-A COST AND FINANCIAL STATEMENT 
See Total 
Section to 
in Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
1. Baltimore Harbor 
and Channels, 
MD and VA 
2. Baltimore Harbor 
MD Collection 
& Removal of 
Drift 
3. Cambridge 
Harbor, MD 
4. Claiborne 
Harbor, MD 
5. Fishing Creek, 
MD 
6. Herring Bay & 
Rockhold Creek, 
MD 
7. Herring 
Creek, MD 
8. Island 
Creek, St. Georges 
Island, MD 
9. Lower Thorofare, 
Deal Island, 
MD 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Contributed 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Contributed 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Contributed 
Approp. 
Cost 
770,000 
1,055,174 
12,865,0002 
13,035,8148 
455,000 
555,821 
15,637,000' 
15,637,0126 
5,904,000 
5,585,736 
7,440,7918 
7,440,790' 
25,579,000 
25,840,645 
5,992,2048 
5,992,027' 
- 17,674,000 
- 17,198,010 
202,000 
202,323 
24,000 
'24,000 
205,000 
201,424 
95,129 
95,127 
80,450 
80,450 
19,310 
19,310 
20,000 
20,000 
236,000 
239,574 
68,000 
68,000 
432,750 
432,748 
20,000 
20,000 
503,200 
478,502 
14,000 
14,000 
1,369,000 
117,978 
164,500 
164,499 
217,000 
217,002 
10,000 
10,000 
423,600 
423,599 
49,700 
49,702 
138,000 
137,999 
398,500 
423,195 
79,100 
79,100 
215,359 
210,742 
132,900 
132,899 
373,500 
1,612,421 
126,500 
126,501 
350,000 
264,348 
4-22 
78,334,7121 
78,205,7951 
79,409,85510 
79,409,67310 
17,674,000 
17,198,010 
3,504,210 
3,504,209 
195,97411 
195,97411 
688,258 
688,258 
42,97412 
42,97412 
682,333 
682,330 
111,242 
111,242 
1,422,100 
1,422,100 
50,591 
50,591 
612,248 
612,247 
1,186,500 
1,186,497 
145,329 
145,329 
225,665 
221,048 
23,836 
23,836 
475,010 
475,009 
1,787,15818 
1,775,057" 
631,942 
631,942 
350,000 
264,348

BALTIMORE, MD DISTRICT 
TABLE 4-A (Continued) COST AND FINANCIAL STATEMENT 
See Total 
Section to 
in Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
10. Nanticoke River 
River (Including 
Northwest Fork), 
DE & MD 
11. Ocean City Harbor 
and Inlet and Sinepuxent 
Bay, MD 
12. Parish Creek, 
MD 
13. Potomac and 
Anacostia Rivers, 
DC, Collection & 
Removal of Drift 
14. Potomac River- 
Aquatic Plant 
Control, MD, 
VA, DC 
15. Prevention of 
Obstructions & 
Injurious Deposits, 
Baltimore Harbor, 
MD 
16. St. Patricks 
Creek, MD 
17. Shallow 
Creek, MD 
18. Slaughter 
Creek, MD 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Contributed 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Contributed 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
2,000 - 
22,944 - 
935,000 781,000 
2,106,987 709,961 
1,750,000 1050,000 
2,734,267 1,056,190 
- - 
- 31,578 
- 31,578 
352,000 410,000 
353,227 394,333 
770,000 115,000 
188,269 694,703 
162,000 51,000 
162,000 50,949 
- 8,354 
- 8,354 
4-23 
51,800 
51,800 
422,600 
493,639 
38,000 
47,143 
19,400 
19,400 
417,000 
432,664 
378,000 
323,826 
54,363 
35,825 
84,000 
84,040 
15,000 
15,000 
43,500 
7,600 
143,13415 
143,13415 
636,577 
636,577 
350,19314 
350,19314 
9,663,608 
9,663,608 
4,335,000 
4,334,999 
19,17016 
19,17016 
443,148 
443,148 
6,701,375 
6,701,113 
1,427,000 
1,363,048 
231,363 
139,669 
4,541,040 
4,541,040 
15,752 
15,752 
133,402 
133,402 
273,500 
228,195 
219,843 
212,717 
4,140 
4,140 
591,570 
591,570 
12,100 
12,102 
497,000 
497,399 
329,314 
329,314 
481,200 
480,942 
164,000 
156,250 
177,000 
103,844 
85,000 
85,011 
86,800 
86,800 
230,000 
220,595 
219,843 
212,717 
143,540 
143,540 
40,000 
40,000

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 4-A (Continued) COST AND FINANCIAL STATEMENT 
See Total 
Section to 
in Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
19. Tred Avon, New Work 
MD Approp. 
Cost 
Maint. 
Approp. 
Cost 
Contributed 
Approp. 
Cost 
20. Twitch Cove & New Work 
Big Thorofare, Approp. 
MD Cost 
Maint. 
Approp. 
Cost 
21. Upper Thorofare, New Work 
MD Approp. 
Cost 
Maint. 
Approp. 
Cost 
22. Washington Harbor, New Work 
DC Approp. 
Cost 
Maint. 
Approp. 
Cost 
23. Wicomico River, New Work 
MD Approp. 
Cost 
Maint. 
Approp. 
Cost 
27. Jennings Randolph New Work 
Lake, MD & WV Approp. 
Cost 
Maint. 
Approp. 
Cost 
28. Fourmile Run, New Work 
VA Approp. 
Cost 
Contributed 
Approp. 
Cost 
29. Cumberland, MD New Work 
and Ridgeley, Approp. 
WV Cost 
Maint. 
Approp. 
Cost 
30A. Aylesworth Creek New Work 
Lake, PA Approp. 
Cost 
Maint. 
Approp. 
Cost 
17,000 
17,000 
36,000 
36,000 
27,569 
27,569 
10,000 
10,000 
63,000 
77,569 
134,000 
915,074 
-100,000 
582,603 
988,978 
1,005,530 
29,294 
162,656 
162,656 
45,000 
45,000 
72,925 
75,636 
206,782 
206,782 
681,000 
681,000 
1,900,000 
1,974,750 
1,160,200 
1,163,471 
43,000 
43,000 
55,000 
55,000 
358,500 
358,498 
44,000 
44,000 
49,000 
49,001 
26,678 
1,759,000 
1,759,018 
704,400 
704,399 
171,300 
171,299 
351,400 
351,398 
99,100 
99,102 
523,310 
523,310 
814,243 
814,242 
171,300 
171,299 
193,175 
193,175 
2,289,211 
2,298,209 
62,446 
62,446 
805,041 
805,041 
3,191,0776 
3,191,07716 
47,800 4,842,2961718 
47,800 4,842,2961718 
366,000 
365,999 
55,000 
55,000 
1,121,700 
1,111,628 
471,60919 
471,60919 
6,328,737 
6,328,735 
176,325,300 
176,321,783 
177,392,000 
177,378,411 
700,000 52,480,000 
700,000 52,480,000 
108,429 
108,429 
55,930 
55,930 
113,500 
113,424 
61,000 
61,000 
101,000 
101,071 
3,393,809 
3,393,809 
64,000 
63,998 
116,900 
116,104 
15,633,97020 
15,633,97020 
703,229 
703,227 
2,320,400 
2,320,400 
1,080,502 
1,079,699 
4-24

BALTIMORE, MD DISTRICT 
TABLE 4-A (Continued) COST AND FINANCIAL STATEMENT 
See Total 
Section to 
in Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
31. Raystown Lake, 
Raystown Branch, 
Juniata River, PA 
32A. Addison, NY 
32B. Almond Lake, 
NY 
32C. Arkport Dam, 
NY 
32D. Avoca, NY 
32E. Binghamton, NY 
32F. Canisteo, NY 
32G. Corning, NY 
32H. East Sidney Lake, 
NY 
321. Elmira, NY 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
1,741,000 2,125,500 2,108,000 2,149,000 
1,778,456 2,077,231 2,138,283 2,160,024 
16,049 
16,124 
160,772 
164,920 
78,363 
87,246 
18,300 
18,300 
28,300 
28,398 
25,800 
25,802 
25,600 
25,600 
300,118 
302,918 
20,400 
20,400 
17,200 
17,200 
379,500 
379,362 
130,700 
130,621 
23,526 
23,525 
18,000 
18,000 
53,474 
53,472 
53,900 
53,900 
262,100 
262,095 
25,900 
25,900 
14,100 
14,091 
234,000 
234,127 
148,000 
148,073 
24,300 
24,300 
383,000 
40,480 
35,200 
35,200 
25,900 
25,874 
38,500 
38,500 
330,000 
329,995 
28,300 
28,297 
9,300 
9,309 
324,800 
322,169 
199,900 
199,401 
31,300 
31,300 
-320,000 
20,392 
28,700 
28,700 
27,800 
27,827 
50,100 
50,100 
378,800 
378,421 
27,600 
27,603 
4-25 
77,408,770 
77,408,770 
19,916,295 
19,909,266 
827,050 
827,050 
187,455 
187,455 
5,760,211 
5,760,211 
3,347,640 
3,344,995 
1,910,00021 
1,910,00021 
1,791,074 
1,790,566 
436,37422 
436,374"2 
411,961 
411,960 
3,015,00023 
3,012,87223 
442,481 
442,481 
1,183,111"4 
1,183,11124 
645,935 
645,934 
3,322,000" 
3,322,00026 
691,658 
691,658 
6,049,504 
6,049,504 
3,826,119 
3,825,724 
6,883,305 
6,883,305 
292,149 
292,149

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 4-A (Continued) COST AND FINANCIAL STATEMENT 
See Total 
Section to 
in Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
32J. Hornell, NY 
32K. Lisle, NY 
32L. Oxford, NY 
32M. Whitney Point 
Lake, NY 
32N. Whitney Point 
Village, NY 
33. Stillwater Lake, 
Lackawanna 
River, PA 
34A. Cowanesque Lake, 
PA 
34B. Tioga-Hammond 
Lakes, PA 
35A. Alvin R. Bush 
Dam, PA 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Contributed 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
85,051 
176,056 
25,400 
25,453 
15,900 
15,900 
265,843 
266,070 
33,200 
33,253 
201,340 
201,680 
106,170 
106,168 
19,800 
19,800 
17,600 
17,600 
304,800 
304,721 
20,500 
20,500 
211,700 
211,631 
670,000 1,065,000 
722,340 853,691 
743,904 932,800 
754,305 938,312 
-60,000 
23,487 
35,000 
30,000 
135,900 
135,901 
26,100 
26,098 
11,300 
11,290 
644,000 
643,908 
18,400 
18,380 
218,000 
218,056 
195,000 
418,395 
894,200 
897,042 
90,000 
65,546 
242,400 
242,399 
28,600 
28,602 
9,100 
9,110 
403,800 
398,680 
16,600 
16,620 
223,800 
223,206 
622,000 
197,929 
974,300 
970,947 
1,277,000 
577,849 
360,000 
265,978 
1,144,289 1,540,700 1,329,800 1,412,600 
1,166,973 1,540,278 1,330,248 1,403,881 
403,810 
572,896 
427,300 
427,275 
463,000 
452,583 
537,700 
546,080 
4,558,69826 
4,558,69826 
3,232,533 
3,232,529 
661,19927 
661,19927 
670,722 
670,722 
131,00028 
131,00028 
209,832 
209,832 
5,421,539 
5,421,539 
4,498,940 
4,493,641 
424,096 
424,096 
340,261 
340,261 
5,725,700 
5,725,700 
2,284,009 
2,283,396 
108,582,700 
108,155,797 
5,643,654 
5,639,653 
1,277,000 
577,849 
19,104,800 
18,981,324 
9,867,254 
9,858,466 
7,103,001 
7,103,001 
4,668,322 
4,666,251 
4-26

TABLE 4-A (Continued) COST 
BALTIMORE, MD DISTRICT 
AND FINANCIAL STATEMENT 
See Total 
Section to 
in Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
35B. Curwensville Lake, New Work 
PA Approp. - - - - 20,396,060 
Cost - - - - 20,396,060 
Maint. 
Approp. 405,491 491,100 628,000 456,300 6,445,689 
Cost 405,237 492,316 628,049 455,574 6,444,934 
35C. Foster Joseph New Work 
Sayers Dam, PA Approp. - - - - 30,887,06329 
Cost - - - - 30,887,06329 
Maint. 
Approp. 446,722 472,300 424,000 549,400 5,455,484 
Cost 449,450 472,515 423,980 549,169 5,455,224 
36. Francis E. Walter New Work 
Approp. - - - 1,441,000 1,441,000 
Cost. - - - 1,057,656 1,057,656 
37. Tamaqua, PA New Work 
Approp. - - - 50,000 50,000 
Cost - - - 34,712 34,712 
37. Wyoming Valley, New Work 
PA Approp. 2,190,000 6,800,000 740,000 -550,000 12,690,000 
Cost 3,205,348 2,686,198 3,531,080 881,410 12,680,457 
39. York, Indian New Work 
Rock Dam, PA Approp. - - - - 5,061,16730 
Cost - - - - 5,061,16730 
Maint. 
Approp. 373,344 534,000 548,000 384,300 5,251,51731 
Cost 379,530 523,994 557,982 384,227 5,251,41291 
Contributed 
Approp. - 85,000 - - 85,000 
Cost - - 81,849 2,002 83,851 
1. Includes $8,764,003 for previous projects. 
2. Includes $40,000 for sections of project in Norfolk 
District. 
3. Includes $200,691 for sections of project in Norfolk 
District. 
4. Includes $88,000 for sections of project in Norfolk 
District. 
5. Includes $88,001 for sections of project in Norfolk 
District. 
6. Includes $967,791 for sections of project in Norfolk 
District. 
7. Includes $967,791 for sections of project in Norfolk 
District. 
8. Includes $127,604 for sections of project in Norfolk 
District. 
9. Includes $127,518 for sections of project in Norfolk 
District. 
10. Includes $399,802 for previous projects. 
11. Excludes $3,998 contributed funds and includes 
$61,321 for previous project. 
12. Project deferred for restudy. 
13. Includes $5,000 for previous project. 
14. Includes $283,008 public works funds and $67,185 
emergency relief funds; excludes $500,000 contributed funds. 
15. Includes $19,170 Works Progress Administration 
funds. 
16. Includes $3,029,001 for previous project. 
17. Includes $1,831,609 for previous project. 
18. Excludes $4,000 for emergency dredging under provisions 
of Section 3, 1945 River and Harbor Act. 
19. Includes $50,000 for previous project and excludes 
$14,000 contributed funds. 
20. Includes $49,998 emergency relief funds. 
21. Includes $62,577 emergency relief funds. 
22. Includes $109,944 emergency relief funds. 
23. Excludes $163,096 contributed funds. 
24. Includes $207,520 rehabilitation funds. 
25. Excludes $34,729 contributed funds. 
26. Includes $250,899 emergency relief funds and excludes 
$15,000 contributed funds. 
27. Includes $71,557 emergency relief funds. 
28. Includes $73,465 emergency relief funds. 
29. Excludes $263,900 contributed funds in accordance 
with the Tri-party Agreement for construction of sanitary 
system for public use. 
30. Includes $11,588 emergency relief funds. 
31. Includes $15,000 for deferred maintenance. 
4-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 4-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
BALTIMORE HARBOR AND CHANNELS, MD and VA 
Aug. 8, Branch channel 35 feet deep to head of Curtis Bay, and one 35 feet deep and 
1917 400 feet wide Fort McHenry to Port Covington entrance channel, thence 
150 feet wide to Ferry Bar, and thence 27 feet deep and 150 feet wide to 
Hanover Street Bridge, widen approaches and bends, and enlarge anchorage 
basin near entrance. Inclusion of Patapsco River and tributaries into one 
project for Baltimore Harbor. 2 
Jan. 21, 
1927 
Jul. 3, 
1930 
Change in location of anchorage near upper end of Fort McHenry Channel. 
Increased anchorage facilities. 
Jul. 3, For 37-foot depth in that portion of channel to Baltimore lying between 37-foot 
1930 depth curve near Baltimore Light to Sparrows Point entrance channel; widen 
angle between Fort McHenry and Ferry Bar section; and for width of 400 
feet in Curtis Bay section. 
Oct. 17, For 22-, 18-, and 15-foot channels in Curtis Creek from 22-foot depth below 
1940 Pennington Avenue Bridge to upper end of marginal wharf of U.S. Ordnance 
Depot. 
Mar. 2, Uniform main channel 39 feet deep from the ocean through York Spit section 
1945 and Craighill entrance to Fort McHenry, additional anchorage area, 2,400 
feet long, 1,200 feet wide, and 30 feet deep; a connecting channel 400 feet 
wide and 27 feet deep from Cutoff Brewerton Angle in main channel to Inland 
Waterway from Delaware River to Chesapeake Bay; a channel in Curtis Creek 
200 feet wide and 35 feet deep from head of existing 35-foot project channel 
in Curtis Bay to a point in the creek about 750 feet below Pennington 
Avenue Bridge. 
Mar. 2, A channel 22 feet deep and 200 feet wide from 22-foot depth curve south of 
1945 Baltimore & Ohio R.R. bridge about 2,800 feet to vicinity of Arundel Cove, 
thence 100 feet wide in Arundel Cove for about 2,100 feet; with an anchorage 
basin about 700 feet square adjacent to channel southwesterly of Coast 
Guard wharf. 
Jul. 3, Main channel 42 feet deep and 1,000 feet wide in Cape Henry section at 
1958 entrance to Chesapeake Bay and in York Spit section; 42 feet deep and 800 
feet wide in Rappahannock Spit section and in approach channel to Baltimore 
Harbor from Craighill entrance to Fort McHenry, with widening at entrance 
and bends; channels 42 feet deep and 600 feet wide in Curtis Bay and Ferry 
Bar sections of harbor; a connecting channel 35 feet deep and 600 feet wide 
from main channel to approach channel to Chesapeake and Delaware Canal; 
and for three disjointed sections of channels of same depth and width in 
Chesapeake Bay leading to Chesapeake and Delaware Canal; and to provide 
Federal maintenance of 39-foot depth in Northwest Branch, in areas dredged 
to that depth by local interests. 
Dec. 31, Deepening of the Cape Henry Channel to 50 feet at the existing width of 
1970 1,000 feet, with widening at bends; deepening of the Spit Channel to 50 feet 
at the existing width of 1,000 feet, with widening at bends; enlargement of 
the Rappahannock Shoal Channel to a depth of 50 feet and a width of 1,000 
feet; deepening of the main ship channel from Chesapeake Bay to Fort 
McHenry to a depth of 50 feet at the existing width of 800 feet, with widening 
at bends and at the Craighill Entrance; deepening of the Curtis Bay 
Channel to a depth of 50 feet at the existing width of 600 feet, and deepening 
of the 950-foot wide and 980-foot long turning basin at the head of channel 
to the same depth; deepening of the Northwest Branch-East Channel to 
a depth of 49 feet from the depth existing at the time of construction at a 
width of 600 feet, and deepening of the 950-foot wide and 950-foot long turning 
basin at the head of the channel to the same depth; and deepening and 
extension of the Northwest Branch-West Channel to a depth of 40 feet from 
the depth existing at the time of construction, at a width of 600 feet, and 
with an irregularly shaped turning basin at the head of the channel 40 feet 
deep and about 2,000 feet long with a maximum width of 1,150 feet. 
H. Doc. 799, 
64th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 11, 
70th Cong., 1st Sess. 
H. Doc. 86, 85th 
Cong., 1st Sess. 
Adopted as a national 
defense project. (No 
printed report.) 
H. Doc. 741, 
79th Cong., 2nd Sess. 
In accordance with 
plans on file in the 
Office, Chief of 
Engineers 
H. Doc. 86, 
85th Cong., 1st Sess. 
H. Doc. 181, 
94th Cong., 1st Sess. 
4-28 
1.

BALTIMORE, MD DISTRICT 
TABLE 4-B (Continued) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
BALTIMORE HARBOR, MD-COLLECTION AND REMOVAL OF 
DRIFT 
Jun. 30, Collection and removal of drift from Baltimore Harbor and its tributary 
1948 waters. 
CAMBRIDGE HARBOR, MD 
Mar. 3, Channel 12 feet deep and 150 feet wide to the drawbridge 10 feet deep and 
1925 100 feet wide from the bridge to the upper end of the harbor with a turning 
basin. 
Aug. 26, Channel 14 feet deep from that depth in Choptank River to the head of the 
1937 harbor with widths of 150 feet below the Market St. Bridge in Cambridge 
and 100 feet above, and a turning basin of the same depth at the head of the 
channel; for an anchorage basin 10 feet deep, 400 feet long, and 175 feet wide 
on the west side of the channel and a second basin of the same depth 225 
feet long and 200 feet wide on the east side of the channel; and a channel 
60 feet wide and 7 feet deep from that depth in Choptank River to the 
municipal boat basin. 
Jun. 30, Modification providing for deepening of the channel in Choptank River and 
1948 Cambridge Creek to 16 feet, with a turning basin of the same depth and of 
irregular dimensions comprising approximately 2.4 acres. 
Jun. 16, Modification providing for Federal maintenance of locally constructed channel 
1978 150 feet wide and 25 feet deep, from that depth in the Choptank River to 
and including a irregularly shaped turning basin of the same depth, with 
such modifications as in the discretion of the Chief of Engineers may be 
advised at an added first cost to the United States presently estimated at 
$257,000. 
CLAIBORNE HARBOR, MD 
Jun. 13, A channel 12 feet deep and 300 feet wide from deep water to the railroad 
1902 pier in the harbor, and thence shoreward along the south side of the pier 
with a width of 195 feet and a length of 500 feet. An extension of the present 
jetty. 
FISHING CREEK, MD 
Aug. 26, A channel 7 feet deep with widths of 100 feet and 60 feet from deep water in 
1937 Chesapeake Bay to an anchorage of the same depth, 120 feet wide and 
400 feet long, located in the marsh 500 feet above the mouth of the creek 
and twin stone jetties at the entrance. 
HERRING BAY & ROCKHOLD CREEK, MD 
Jul. 3, A channel 60 feet wide, 5 feet deep, from the 6-foot contour in Herring Bay 
1930 to the 3-foot contour in Rockhold Creek. 
Jun. 20, For the present project channel dimensions, 7 feet deep and 60 feet wide, 
1938 the turning basin 7 feet deep, and a stone breakwater 900 feet long. 
HERRING CREEK, MD 
Jul. 3, Provides for an entrance channel 6 feet deep and 60 feet wide with a 
1950 turning basin of irregular shape and 6 feet deep, and riprap stone jetties 
on the upstream and downstream sides of the entrance channel 770 and 650 
feet long, respectively. The project length is 1,630 feet. 
Mar. 7, 
1986 
Sec 111 
Constructing 250 feet of beachfill, 2,187 linear feet of stone revetment, 
and upgrading 350 feet of existing revetment along the Tall Timbers 
waterfront. 
ISLAND CREEK, ST. GEORGES ISLAND, MD (See Section 9 of Text) 
Mar. 2, A channel 5 feet deep and 50 feet wide through the entrance to Island 
1945 Creek with an anchorage basin of same depth, 200 feet wide, and 500 feet 
long in the creek. 
River and Harbor Act 
of 1948 
H. Doc. 210, 
68th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 7, 
75th Cong., 1st Sess. 
H. Doc. 381, 
80th Cong., 1st Sess. 
H. Doc. 355, 
95th Cong., 2 Sess. 1 
H. Doc. 81, 
56th Cong., 1st Sess. 
H. Doc. 241, 
75th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 34, 
71st Cong., 2nd Sess. 
H. Doc. 595, 
75th Cong., 3rd 
Sess. 
H. Doc. 159 
84th Cong., 1st Sess.' 
Detailed Project 
Report 
July 18, 1985 
H. Doc. 99, 
76th Cong., 1st Sess. 
4-29 
4. 
5. 
6.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 4-B (Continued) 
See Date 
Section Authorizing 
in Text Act 
AUTHORIZING LEGISLATION 
Project and Work Authorized 
Jun. 25, 
1910 
Mar. 2, 
1945 
Mar. 7, 
1986 
Sec 107 
Jun. 3, 
1896 
Jun. 25, 
1910 
Jun. 25, 
1910 
Mar. 2, 
1945 
9. 
OCEAN CITY HARBOR & INLET & SINEPUXENT BAY, MD 
Aug. 30, Construction of an inlet between the Atlantic Ocean and Sinepuxent Bay, 
19358 10 feet deep and 200 feet wide, protected by jetties; a channel 8 feet deep 
and 100 feet wide from the inlet to Ocean City, 6 feet deep and 150 feet 
wide to Green Point, and 100 feet wide into Chincoteague Bay. 
Aug. 30, Modification providing a 10-foot by 100-foot channel from the inlet to the 
1935 west side of the bay with two turning basins; a channel 6 feet deep and 125 
feet wide from the inlet channel to opposite North 8th Street, Ocean City, 
and 75 feet wide into Isle of Wight Bay. 
Sep. 3, Modification providing for raising the north jetty to an elevation 9 feet 
19456 above mean low water, and a channel 300 feet wide and 16 feet deep from 
the ocean through the inlet to the Isle of Wight Bay Channel, thence 200 
feet to the project harbor, and a depth of 14 feet in the project harbor. Channel 
depths refer to project datum. 
PARISH CREEK, MD 
Aug. 30, Provide a channel 8 feet deep and 50 feet wide, widened at its ends, from 
1935 deep water in West River to the head of the south fork of Parish Creek, 
and an anchorage basin at the junction with the north fork of Parish Creek, 
having a depth of 6 feet and an area not exceeding 1.5 acres. 
POTOMAC & ANACOSTIA RIVERS, DC-COLLECTION & 
REMOVAL OF DRIFT 
Oct. 27, Collection and removal of drift from waters of the Potomac and Anacostia 
1965 Rivers and their tributaries in the Washington, DC area from the head of 
the tidewater to Mount Vernon, VA. 
POTOMAC RIVER AQUATIC PLANT 
CONTROL, MD, VA, DC 
Jul. 2, Control of Hydrilla and other nuisance plants using mechanical harvesting 
1986 to clear a 60 foot wide, 6 foot deep connecting channel from open waters to 
eligible public use areas. 
PREVENTION OF OBSTRUCTIONS & INJURIOUS DEPOSITS, 
BALTIMORE HARBOR, MD 
Aug. 28, Continuous patrol and inspection of Baltimore Harbor, Chesapeake Bay, 
1958 and its tributaries to prevent and detect violations, and issue permits as 
required for transporting and depositing waste materials in navigable 
waters. (The project is limited to the tidal waters of Chesapeake Bay and 
its tributaries that lie within the State of Maryland.) 
LOWER THOROFARE, DEAL ISLAND, MD 
A channel 6 feet deep, 80 feet wide, from Tangier Sound to the wharves 
at Wenona; widening the angles and the end to furnish anchorage basins. 
Modified to provide a channel 60 feet wide, 7 feet deep from Tangier Sound 
to and including a mooring basin 7 feet deep, 100 feet wide, 300 feet long, 
in the marsh at the head of the cove at Wenona. 
Constructing a stone breakwater within Lower Thorofare, and a stone jetty 
on Deal Island to reduce channel maintenance. 
NANTICOKE RIVER (INCLUDING NORTHWEST FORK), DE & MD 
A 9-foot channel, 100 feet wide up to Seaford, DE, with a turning basin. 
Slight widening between bridges in harbor at Seaford, DE. 
A channel 6 feet deep, 60 feet wide in Northwest Fork, together with turning 
basin. 
A channel 12 feet deep, 100 feet wide from 12-foot contour in Tangier Sound 
to highway bridge at Seaford, DE. 
4-30 
10. 
Documents 
H. Doc. 76, 
60th Cong., 1st Sess. 
H. Doc. 238, 
76th Cong., 1st Sess.' 
Detailed 
Project Report. 
Mar. 8, 1984 
H. Doc. 323, 
53rd Cong., 3rd Sess., 
and Annual Report, 
1985, p. 1165. 
H. Doc. 674, 
61st Cong., 2nd Sess. 
H. Doc. 869, 
60th Cong., 1st Sess.s 
S. Doc. 69, 
77th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 38, 
72nd Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 60, 
74th Cong., 1st Sess. 
H. Doc. 444, 
82nd Cong., 2nd Sess. 
H. Doc. 185, 
72nd Cong., 1st Sess. 
H. Doc. 286, 
89th Cong., 1st Sess. 
State Design 
memorandum 
July 2, 1986 
River and Harbor Act, 
June 29, 1888 as 
amended by Public 
Law 85-802, dated 
August 28, 1958 
11. 
12. 
13. 
14. 
15. 
v

BALTIMORE, MD DISTRICT 
TABLE 4-B (Continued) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
16. 
17. 
Jun. 20, 
1938 
Present project dimensions of main channel with twin jetties at entrance. 
May 17, Anchorage basin 7 feet deep, 100 feet wide and 700 feet long on west side 
1950 of project channel at Ewell, MD, and an extension of existing project 
channel in Levering Creek, 6 feet deep, 60 feet wide, and 1,000 feet long. 
UPPER THOROFARE, DEAL ISLAND, MD 
Aug. 30, A 9-foot channel 75 feet wide protected by breakwater at entrance, with 
1935 turning basin at inner end and anchorage area 6 feet deep and 150 feet 
wide. 
Aug. 26, Widen entrance channel to 100 feet, extend 9-foot turning basin and 6-foot 
1937 anchorage, and dredging an additional anchorage area on north side of 
channel. 
WASHINGTON HARBOR, DC 
Aug. 30, Provides for: (a) Virginia Channel, from Giesboro Point to area for 25,000 
1935 square feet; (b) Washington Channel, from Haines Point to head of Washington 
Channel, 24 feet deep and 400 feet wide; (c) Anacostia River from 
Giesboro Point to Anacostia Bridge, 24 feet deep and 400 feet wide, with 
turning basin 800 feet wide and about 2,400 feet long of same depth opposite 
Naval Weapons Plant; (d) Anacostia River from Anacostia Bridge 24 feet 
deep and 200 feet wide to turning basin 400 feet square of same depth at 
foot of 15th Street SE Channel lengths including turning basins are: Virginia 
Channel, 25,000 feet; Washington Channel, 10,000 feet; and Anacostia River, 
15,000 feet; and (e) operation and maintenance of inlet gates and lock and 
outlet gates of Tidal Basin constructed under a previous project to flush 
Washington Channel. 
ST. PATRICKS CREEK, MD 
May 17, Entrance channel 7 feet deep, 60 feet wide and approximately 2,450 feet 
1950 long from deep water in St. Clement Bay to deep water within the creek. 
SHALLOW CREEK 
May 22, Dredging a navigation channel, 5 feet deep at mean low water, 50 feet wide, 
1986 and 2,700 feet long from the Patapsco River to a turning basin, 100 feet 
wide by 100 feet long at the head of creek. 
SLAUGHTER CREEK, MD 
Jul 25, A channel 7 feet deep and 100 feet wide at mean low water through the 
1912 bar at the mouth, a distance of about one-third of a mile, the lower end 
of the section extending about 900 feet into Little Choptank River. 
TRED AVON RIVER, MD 
Jul. 25, Restore the channel, formerly dredged from Peach Blossom Creek to Easton 
1912 Point, to 8 feet deep at mean low water, and 150 feet wide, widening out 
at the upper end. 
Mar. 2, A channel 8 feet deep and 150 feet wide up the North Fork, with a turning 
1919 basin at the upper end. 
Oct. 27, A 12-foot channel from a point near Peach Blossom Creek to Easton Point, 
1965 thence 1,400 feet in North Fork and a turning basin 12 feet deep and 250 
feet wide and 600 feet long in the South Fork. 
TWITCH COVE AND BIG THOROFARE, MD 
Jul. 25, A channel 4 feet deep and 25 feet wide from Tangier Sound into Big 
1912 Thorofare River, and one of same dimensions around point between said 
river and Tyler River. 
Jul. 3, A channel 5 feet deep at mean low water and 25 feet wide from Twitch 
1930 Cove on Tangier Sound through Big Thorofare River to a point on Levering 
Creek about 800 feet north of canal at Ewell, MD. 
Aug. 30, A channel 7 feet deep and 60 feet wide from Twitch Cove through Big 
1935 Thorofare River to a point on Levering Creek about 800 feet north of 
canal at Ewell, MD. 
4-31 
H. Doc. 671, 
80th Cong., 2nd 
Sess.' 
Detailed Project 
Report Jan. 1986 
H. Doc. 87, 
62nd Cong., 1st Sess. 
H. Doc. 399, 
62nd Cong., 2nd Sess? 
H. Doc. 26, 
63rd Cong., 1st Sess.' 
H. Doc. 225, 
89th Cong., 1st Sess.' 
H. Doc. 285, 
62nd Cong., 2nd Sess. 
H. Doc. 313, 
71st Cong., 2nd Sess. 
Rivers and Harbors 
Committee Doc. 67, 
74th Cong., 1st Sess. 
Rivers & Harbors 
Committee Doc. 49, 
75th Cong., 2nd Sess.' 
H. Doc. 340, 
81st Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 37, 
72nd Cong., 1st Sess. 
H. Doc. 76, 
75th Cong., 1st Sess.' 
Rivers and Harbors 
Committee Doc. 22, 
74th Cong., 1st Sess.' 
18. 
19. 
20. 
21. 
22.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 4-B (Continued) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
23. 
Oct. 23, 
1962 
Jun. 25, 
1970 
Jul. 17, 
1970 
Mar. 7, 
1974 
29. 
Jun. 22, 
1936 
Jul. 24, 
1946 
JENNINGS RANDOLPH LAKE, MD & WV 
Construction of Bloomington Lake project. 
FOURMILE RUN, VA 
Construction of a levee and floodwall protection system with associated 
interior drainage facilities, an improved channel and replacement of two 
highway and four railroad bridges. 
Modification providing for channel capacity of 27,000 c.f.s.; increase channel 
bottom widths along Fourmile Run; deletion of pumping stations, ponding 
areas, and levees, except for a short levee on Long Branch; and the addition 
of recreation as a project feature. 
CUMBERLAND, MD AND RIDGELEY, WV 
Levees, retaining walls, movable dam, and channel clearing for Cumberland, 
West Cumberland and South Cumberland, MD and Ridgeley, WV. 
Levees, wall, channel improvement, remove Chesapeake and Ohio Canal 
Dam and construct new industrial dam. 
LACKAWANNA RIVER BASIN, PA 
Oct. 23, Construction of Aylesworth Creek Lake, Fall Brook Lake, and local pro- 
1962 tection works on Lackawanna River at Scranton, Pennsylvania. 
Oct.23, 
1962 
Jun. 22, 
1936 
modified 
by Acts 
of Jun. 
28, 1938; 
Aug. 18, 
1941; 
Dec. 22, 
1944; 
May 17, 
1950; and 
Jul. 3, 
1958 
RAYSTOWN LAKE, RAYSTOWN BRANCH, JUNIATA RIVER, PA 
Construction of dam and appurtenant facilities. 
SOUTHERN NEW YORK FLOOD CONTROL PROJECTS 
Construction of detention reservoirs and related flood control works for 
protection of Binghamton, Hornell, Corning and other towns in New York 
and Pennsylvania. 
WICOMICO RIVER, MD 
Sep. 19, Channel 9 feet deep from Main Street Bridge to about 2 miles below. 
1890 
Jun. 25, Extend 9-foot depth into north prong from Main Street Bridge to the 
1910 Salisbury Dam and turning basin. 
Mar. 2, Extend 9-foot depth into south prong to head of navigation at Cathell Street, 
1919 including a turning basin, and extend project down to mouth of river in 
Monie Bay. 
Jul. 3, A 12-foot channel below the Main Street Bridge. 
1930 
Aug. 26, A 14-foot channel, 150 feet wide; depths of 14 feet in the north and south 
1937 prongs and a basin 6 feet deep at Webster Cove and approach channel 
thereto of the same depth. 
Sep. 3, Enlarge existing basin at Webster Cove, by dredging an extension 6 feet 
1954 deep, 100 feet wide, and 200 feet long on each side of existing basin to 
form a T-shaped harbor. 
H. Doc. 101, 
73rd Cong., 1st Sess. 
Report on file in 
Office, Chief of 
Engineers. 
S. Doc. 141, 
87th Cong., 2nd Sess. 
H. Doc. 565, 
87th Cong., 2nd Sess. 
H. Doc. 702, 
77th Cong., 2nd Sess. 
4-32 
i
i 
27. 
28. 
30. 
31. 
32. 
H. Doc. 20, 
51st Cong., 1st Sess., 
and Annual Report 
1890, p. 947, 
H. Doc. 569, 
61st Cong., 2nd Sess. 
H. Doc. 1509, 
63rd Cong., 3rd Sess. 
Senate Committee 
Print, 75th Cong., 
3rd Sess.1 
H. Doc. 619, 
81st Cong., 2nd Sess. 
H. Doc. 469, 
87th Cong., 2nd Sess. 
H. Doc. 358, 
91st Cong., 2nd Sess. 
e

BALTIMORE, MD DISTRICT 
TABLE 4-B (Continued) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
33. STILLWATER LAKE, LACKAWANNA RIVER, PA 
Aug. 18, Construction of a flood control reservoir. H. Doc. 702, 
1941 77th Cong., 2nd Sess. 
34. SUSQUEHANNA RIVER FLOOD CONTROL PROJECTS, NY AND PA 
Jul. 3, Construction of Cowanesque and Tioga-Hammond reservoirs, local flood H. Doc. 394, 
1958 protection works at Elkland, PA, and Nichols, NY and channel improve- 84th Cong., 2nd Sess. 
ment at Cortland, NY. 
Oct. 22, Modification in connection with the construction of Cowanesque Lake to 
1976 relocate the Town of Nelson, PA, to a new townsite. 
Mar. 1, Modification of Cowanesque Lake to include water supply as provided by 
1983 Section 4 of the Flood Control Act of 1944 (PL 78-534) and Section 301 of 
Water Supply Act of 1958 (PL 85-500). 
35. WEST BRANCH OF SUSQUEHANNA RIVER, PA 
Sep. 3, Construction of three flood control reservoirs. H. Doc. 29, 
1954 84th Cong., 1st Sess. 
36. FRANCIS E. WALTER DAM, PA 
Oct. 23, Modification to the existing flood control project by adding 23 billion gallons H. Doc. 522, 
1962 of water supply storage by raising the dam and the permanent pool. 87th Cong., 2nd Sess. 
37. TAMAQUA, PA 
Mar. 7, The improvement will consist of constructing a nine-foot diameter tunnel Secretary of Army 
1974 under the Borough. Report on Development 
in Appalachia 
dated April 12, 1971. 
38. WYOMING VALLEY, PA 
Jun. 22, Construction of a levee and flood wall protection system with associated H. Doc. 308, 
1936 interior drainage facilities at Plymouth, Kingston-Edwardsville, Swoyersville- 69th Cong. 1st Sess. 
Forty Fort, and Wilkes-Barre and Hanover Township. 
39. YORK, INDIAN ROCK DAM, PA 
Jun. 22, Construction of Indian Rock Dam and channel improvements on Codorus H. Doc. 702, 
1936 Creek. 77th Cong., 2nd Sess. 
1. Contains latest published maps. September 16, 1933. The site chosen for the inlet under this 
2. Exclusive of portion considered inactive. Inactive por- authorization was that opened just south of Ocean City by 
tion is widening 35-foot depth channel from 150 to 400 feet from natural forces during a severe storm in August 1933. This 
Port Covington to Ferry Bar, widening 27-foot depth channel eliminated the necessity for an 8-foot channel from the inlet to 
from 150 to 250 feet to Hanover Street Bridge, and providing Ocean City. 
a channel 27 feet deep by 250 feet wide to Western Maryland 4. Included in Emergency Relief program 1935. 
Railway Bridge with an anchorage and turning basin at the 5. Raising of the north jetty to an elevation of 9 feet above 
upper end. mean low water was accomplished with maintenance funds in 
3. Included in Public Works Administration program 1956. 
OTHER AUTHORIZED NAVIGATION PROJECTS 
TABLE 4-C 
Cost to September 30, 1987 
For Last 
Full Report 
See Annual Operation and 
Project Status Report Construction Maintenance 
Accotink Creek, VA' 
Anacostia River and Flats2 
Annapolis Harbor, MD 
Completed 
Deferred 
Completed 
1878 
1953 
1946 
$ 5,000 
3,910,582 
34,2508 
$- 
15,623 
4-33

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
OTHER AUTHORIZED NAVIGATION PROJECTS 
TABLE 4-C (Continued) 
Cost to September 30, 1987 
For Last 
Full Report 
See Annual Operation and 
Project Status Report Construction Maintenance 
Aquia Creek, VA Inactive 1928 52,465' 11,770 
Back Creek, MD Completed 1946 23,061 23,072 
Betterton Harbor, MD Inactive 1960 3,482 - 
Black Walnut Harbor, MD Completed 1982 32,631 420,346 
Bonum Creek, VA 6 Completed 1982 202,0006 155,314 
Branson Cove, 
Lower Machodoc River, VA Completed 1950 15,755 17,675 
Breton Bay, MD' Inactive 1950 47,9248 12,621 
Broad Creek River, DE Completed 1964 64,510' 114,373 
Broad Creek, MD Completed 1962 28,227 81,219 
Chester River, MD Completed 1986 70,49510 1,364,473 
Choptank River, MD11 Completed 1979 96,796 94,095 
Corsica River, MD Completed 1948 39,07112 90,735 
Crisfield Harbor, MD Completed 1980 349,15418 570,320"1' 
Cypress Creek, MD Completed 1947 3,057 10,528 
Duck Point Cove, MD Completed 1982 25,289 302,535 
Elk and Little Elk Rivers, MD" Completed 1932 90,12116 53,808" 
Fishing Bay, MD Completed 1985 33,874 715,592 
Goose Creek, MD 5 Completed 1973 75,900 8,312 
Honga River and Tar Bay 
(Barren Island Gaps), MD Completed 1985 66,11918 2,998,926 
Island Creek, MD Completed 1948 6,230 54,828 
Knapps Narrows, MD Completed 1985 46,12119 562,583 
La Trappe, MD Completed 1980 8,064 40,475 
Little Creek, Kent Island, MD Completed 1958 23,00020 7,327 
Little Wicomico River, MD Completed 1986 81,88521 1,383,261 
Lowes Wharf, MD Completed 1986 21,000 317,829 
Lower Machodoc Creek, VA Completed 1904 9,916 25,143 
Madison Bay, MD5 Completed 1977 125,550 32,087 
Manokin River, MD22 Completed 1919 34,788" 43,534 
Middle River and Dark Head Creek, MD Completed 1947 38,715"4 34,355 
Monroe Bay and Creek, VA Completed 1982 12,460 207,685 
Muddy Hook and Tyler Coves, MD 5 Completed 1984 64,001 391,708 
Nan Cove, MD5 Completed 1965 34,861" 22,498 
Nanticoke River at Bivalve, MD15 Completed 1983 240,817 142,131 
Nanticoke River, MD Completed 1971 73,243 76,89526 
Neabsco Creek, MD Inactive 1978 14,600 - 
Neale Sound, MD Completed 1982 12,60027 308,777 
Neavitt Harbor, MD5 Completed 1968 36,500 28,084 
Nomini Bay and Creek, VA25 Completed 1946 78,446 42,063 
Northeast River, MD Completed 1984 28,48929 928,474 
Occoquan Creek, VA'5 Completed 1971 66,253s0 176,920 
Patuxent River, MD'5 Completed 1905 14,0008' - 
Pocomoke River, MD Inactive 1985 191,72632 1,537,535 
Potomac River and Tributaries at and 
below Washington, DC, Elimination 
of Waterchestnut Completed 1977 - 184,394 
Potomac River at Alexandria, VA Completed 1965 95,214 506,394 
Potomac River at Lower Cedar Point, MD Completed 1920 10,234 6,216 
Potomac River at Mt. Vernon, VA'5 Completed 1984 17,000 314,083 
Potomac River below Washington, DC Completed 1984 153,836 1,876,673 
Potomac River North Side 
of Washington Channel, DC' Completed 1956 1,744,692" 27,46126 
Queenstown Harbor, MD Completed 1985 72,858"s 321,803 
Rhodes Point to Tylerton, MD Completed 1986 304,000 711,194 
Rock Hall Harbor, MD Completed 1982 1,072,500" 77,113 
Shad Landing State Park, MD Completed 1966 33,531"s 14,921 
St. Catherines Sound, MD Completed 1981 29,94737 271,618 
St. Georges Creek, MD Completed 1985 147,650 - 
4-34

BALTIMORE, MD DISTRICT 
OTHER AUTHORIZED NAVIGATION PROJECTS 
TABLE 4-C (Continued) 
Cost to September 30, 1987 
For Last 
Full Report 
See Annual Operation and 
Project Status Report Construction Maintenance 
St. Jeromes Creek, MD Completed 1982 44,35738 400,243 
St. Michaels Harbor, MD5 Completed 1964 16,72337 7,742 
St. Peters Creek, MD 5 Completed 1963 46,74039 17,084 
Smith Creek, MD Completed 1936 5,252 8,551 
Susquehanna River 
above and below Havre De Grace, MD Completed 1985 293,5704� 929,018 
Susquehanna River at Williamsport, PA5 Completed 1974 57,03141 41,437 
Tilghman Island Harbor, MD Completed 1983 424,80042 378,783 
Town Creek, MD Completed 1950 43,220 29,368 
Tuckahoe River, MD Completed 1980 9,727 23,489 
Tyaskin Creek, MD Completed 1923 16,29743 54,302 
Upper Machodoc Creek, VA Completed 1971 20,281 34,777 
Warwick River, MD Completed 1984 22,041" 145,911 
1. Unconstructed portion of the project was deauthorized 23. Includes $2,000 expended outside project limits. 
August 5, 1977. 24. Excludes $111,581 expended by Navy Department and 
2. Project deferred for restudy. $54,000 from contributed funds. 
3. Includes $8,476 for previous project. 25. Excludes $565 contributed funds. 
4. Includes $31,065 for previous project. 26. Excludes $101,162 Public Health Service funds expend- 
5. Authorized by Chief of Engineers. ed for waterchestnut removal. 
6. Unconstructed portion of the project is inactive. 27. Excludes $1,000 contributed funds. 
7. Excludes $3,998 contributed funds. 28. Unconstructed portion of the project was deauthorized 
8. Includes $37,500 for previous project. November 6, 1977. 
9. Includes $50,000 for previous project. 29. Includes $20,640 for previous project. 
10. Includes $38,041 for previous project. 30. Includes $25,000 for previous project. 
11. Authorization for the unconstructed portion of the 31. Includes $10,617 for previous project. 
project was withdrawn by the Chief of Engineers January 32. Unconstructed portion of the project is inactive. In- 
22, 1979. cludes $20,500 for previous project. 
12. Includes $30,000 for previous project. 33. Excludes $389,000 contributed funds. 
13. Includes $87,740 for previous project. 34. Includes $19,000 for previous project. 
14. Includes $2,839 for previous project. 35. Excludes $672,880 contributed funds. 
15. Unconstructed portion of the project was deauthorized 36. Excludes $24,125 contributed funds. 
November 2, 1979. 37. Excludes $600 contributed funds. 
16. Includes $79,626 for previous project and excludes 38. Includes $26,500 for previous project. 
$8,414 contributed funds. 39. Excludes $6,984 contributed funds. 
17. Includes $24,321 for previous project. 40. Unconstructed portion of the project was deauthorized 
18. Excludes $2,200 contributed includes $27,668 emer- November 6, 1977. Includes $22,905 Works Progress funds and 
gency relief funds. $97,390 for previos project. 
19. Includes $46,121 public works funds. 41. Excludes $40,000 contributed funds. 
20. Excludes $1,100 contributed funds. 42. Excludes $16,409 contributed funds. 
21. Excludes $5,000 contributed funds. 43. Includes $10,158 for previous project. 
22. Abandonment recommended in 1926 (H. Doc. 467, 69th 44. Includes $6,000 for previous project. 
Cong., 1st sess.) 
OTHER AUTHORIZED BEACH 
TABLE 4-D EROSION CONTROL PROJECTS 
Cost to September 30, 1987 
For Last 
Full Report 
See Annual Operation and 
Project Status Report Construction Maintenance 
Oxford, MD1 Completed 1978 $ 97,750' - 
Colonial Beach, VA Active 1986 518,030 - 
1. Authorized by Chief of Engineers. 
2. Excludes $80,648 contributed funds. 
3. Excludes $414,977 contributed funds. 
4-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
TABLE 4-E 
Cost to September 30, 1987 
For Last 
Full Report 
See Annual Operation and 
Project Status Report Construction Maintenance 
Anacostia River and Tributaries, Flood Protection 
and Navigation Improvements, DC and MD Completed 1980 $ 6,042,325 $1,417,655 
Anacostia River and Tributaries, 
Prince Georges Co., MD' Completed 1977 1,000,0008 - 
Bainbridge, NY *,4 Completed 1959 382,000 - 
Bath, NY5 Completed 1970 638,332 - 
Bayard, WV' Completed 1965 55,2188 - 
Black Walnut Point, MD Completed 1985 200,500 - 
Bridgewater, VA' Completed 1953 136,500 - 
Bull Run, PA Completed 1984 2,742,000 - 
Conklin-Kirkwood, NY' Completed 1955 71,000 - 
Cortland, NY7 Completed 1970 324,486 - 
Elkland, PA Completed 1971 1,297,850 - 
Endicott Johnson City and Vestal, NY Completed 1979 7,034,5348 - 
Forest Heights, MD' Completed 1964 430,000' - 
Greene, NY' Completed 1951 37,000 - 
Kingston-Edwardsville, PA Completed 1979 4,731,3941� - 
Kitzmiller, MD' Completed 1965 501,50011 - 
Latta Brook Rd., NY Completed 1984 115,500 - 
Lock Haven, PA12 Active 1980 450,000 - 
Nichols, NY Completed 1974 1,487,800 - 
Norwich, NY' Completed 1950 94,500 - 
Painted Post, NY' Completed 1970 414,181 - 
Plymouth, PA Completed 1958 1,911,68914 - 
Savage River Dam, MD Completed 1954 2,271,93915 33,999 
Scranton, PA" Completed 1971 2,006,800 - 
Sunbury, PA Completed 1953 6,063,00017 - 
Swoyersville-Forty Fort, PA Completed 1968 2,728,113 - 
Tyrone, PA 8 Deferred 1980 6,401,016 - 
Unadilla, NY Completed 1970 1,000,000"' - 
Upper Marlboro, MD' Completed 1965 590,013 - 
Verona Lake, VA2� * Deferred 1978 992,000 - 
Washington, DC and Vicinity Completed 1953 331,92721 - 
Wilkes-Barre, Hanover Township, PA Completed 1958 3,853,457" - 
Williamsport, PA Completed 1979 12,964,893" - 
1. Local interests will not accept operation and maintenance 
responsibility of the project until the severe erosion 
and sedimentation of the project caused by tropical storm Eloise 
is corrected and the project is restored to design condition. 
2. Excludes $357,022 contributed funds. 
3. Authorized by Chief of Engineers. 
4. Unit of Southern New York Flood Control Projects. 
5. Excludes $182,672 Public Works Acceleration funds 
and $4,290 contributed funds. 
6. Unit of Susquehanna River Flood Control Projects. 
7. Excludes $154,694 contributed funds. 
8. Excludes $87,720 contributed funds. 
9. Includes $1,162,548 emergency relief funds and excludes 
$225,877 emergency relief funds expended prior to adoption 
of project. 
10. Excludes $6,616 contributed funds. 
11. Authorized for Phase I design memorandum stage of 
advanced engineering and design. 
12. Excludes $481,000 for Phase I funded under General 
Investigations beginning October 1, 1978. 
13. Includes $4,357 emergency relief funds. 
14. Includes $200,000 expended from contributed funds. 
15. Unit of Lackawanna River Basin Projects. 
16. Excludes $140,504 contributed funds. 
17. The unconstructed portion of the project was reclassified 
to the deferred category January 8, 1981. 
18. Excludes $132,578 contributed funds. 
19. Authorized for the design memorandum stage of advanced 
engineering and design. 
20. Cost of previous project. Includes $106,500 emergency 
relief funds. 
21. Includes $872,715 emergency relief funds. Excludes 
$36,375 emergency relief funds expended for new work before 
adoption of project. 
22. Includes $1,887 emergency relief funds and excludes 
$110,835 contributed funds. 
4-36

BALTIMORE, MD DISTRICT 
DEAUTHORIZED PROJECTS 
TABLE 4-G 
For Last 
Full Report Date Federal Contributed 
See Annual and Funds Funds 
Project Report For Authority Expended Expended 
Almond Village, NY"12 
Baltimore Harbor & Channels, MD 
(Ferry Bar & Spring Garden Channel) 
Broadwater Creek, MD 
Cadle Creek, MD2 
Channel Connecting Plain 
Dealing Creek and Oak 
Creek, MD 
Coan River, VA 
Copes Corner Lakes, NY2 
Cuckold Creek, MD 4 
Cunninghill Cove, MD 4 
Davenport Center Lake, NY 2 
Fall Brook Lake, PA'5 
Genegantslet Lake, NY 
1970 
1920 
1949 
1949 
1940 
1937 
1970 
1978 
1977 
1970 
1970 
1954 
1950 
1937 
1950 
1950 
1949 
1941 
Governors Run, MD 
Harpers Ferry, WV 
Hellens Creek, MD 
Lake Ogleton, MD 
Mill Creek, MD 
Moorefield, WV 
May 26, 1953 
1941 Flood 
Control Act 
Nov. 17, 1986 
1986 Water 
Res. Dev. Act 
Nov. 6, 1977 
1974 Water 
Res. Dev. Act 
Nov. 6, 1977 
1974 Water 
Res. Dev. Act 
Aug. 5, 1977 
1974 Water 
Res. Dev. Act 
Aug. 5, 1977 
1914 Water 
Res. Dev. Act 
May 6, 1981 
1974 Water 
Res. Dev. Act 
Jan. 22, 1979 
1960 River 
and Harbor Act 
Jan. 22, 1979 
1960 River 
and Harbor Act 
May 6, 1981 
1974 Water 
Res. Dev. Act 
May 6, 1981 
1974 Water 
Res. Dev. Act 
May 6, 1981 
1974 Water 
Res. Dev. Act 
Aug. 5, 1977 
1974 Water 
Res. Dev. Act 
Aug. 5, 1977 
1974 Water 
Res. Dev. Act 
Nov. 6, 1977 
1974 Water 
Res. Dev. Act 
Nov. 6, 1977 
1974 Water 
Res. Dev. Act 
Nov. 6, 1977 
1974 Water 
Res. Dev. Act 
Oct. 3, 1978 
1974 Water 
Res. Dev. Act 
4-37 
$ 24,6223 
787,710 
212 
112 
106,7003 
5,720 
11,200 
286,4003 
46,100 
214,5783 
7,9283

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
DEAUTHORIZED PROJECTS 
TABLE 4-G (Continued) 
For Last 
Full Report Date Federal Contributed 
See Annual and Funds Funds 
Project Report For Authority Expended Expended 
Saint Georges Creek, MD 1971 Sep. 23, 1986 $ -- 
1974 Water 
Res. Dev. Act 
Sixes Bridge Lake, MD & PA6 1974 Dec. 29, 1981 -- 
1974 Water 
Res. Dev. Act 
South Plymouth Lake, NY 1953 May 6, 1981 100,036 - 
1974 Water 
Res. Dev. Act 
Waterway from Little Choptank River to 1939 Aug. 5, 1977 305- 
Choptank River, MD 1974 Water 
Res. Dev. Act 
West Oneonta Lake, NY 2 1970 May 6, 1981 189,100- 
1974 Water 
Res. Dev. Act 
1. Local cooperation withdrawn, project authorization 5. Unit of Lackawanna River Basin Projects. 
expired May 26, 1953. 6. Authorized for the design memorandum stage of ad- 
2. Unit of Southern New York Flood Control Projects. vanced engineering and design. 
3. Cost for preliminary work only. 
4. Project authorization was withdrawn by the Chief of 
Engineers. 
RECONNAISSANCE AND CONDITION SURVEYS 
TABLE 4-H 
Date Survey 
Project Completed 
MARYLAND 
Black Walnut Harbor December 1986 
Corsica River December 1986 
Crisfield Harbor September 1987 
Duck Point Cove December 1986 
Fishing Bay April 1987 
Knapps Narrows December 1986 
Madison Bay April 1987 
Middle River and Dark Head Creek January 1987 
Muddy Hook and Tyler Coves December 1986 
Nanticoke River at Bivalve April 1987 
Neale Sound November 1986 
Northeast River June 1987 
Shad Landing State Park June 1987 
Tyaskin Creek April 1987 
VIRGINIA 
Bonum Creek May 1987 
Lower Machodoc Creek November 1986 
Potomac River at Mt. Vernon May 1987 
4-38

BALTIMORE, MD DISTRICT 
INSPECTION OF COMPLETED PROJECTS 
TABLE 4-I 
Date Inspected 
MARYLAND 
Anacostia River Basin 
Forest Heights 
Upper Marlboro 
NEW YORK 
Bainbridge 
Bath 
Cincinnatus 
Conklin-Kirkwood 
Corning-Monkey Run 
Cortland 
Endicott-Johnson City & Vestal 
Greene 
Nichols 
Norwich 
Oneonta 
Owego 
Painted Post 
Port Dickinson 
Sherburne 
Unadilla 
PENNSYLVANIA 
Elkland 
Kingston-Edwardsville 
Milton 
Plymouth 
Swoyersville-Forty Fort 
Wilkes-Barre-Hanover Twp. 
Williamsport 
VIRGINIA 
Fourmile Run 
WEST VIRGINIA 
Bayard 
Ridgeley 
November 1986 
November 1986 
November 1986 
October 1986 
October 1986 
October 1986 
October 1986 
October 1986 
October 1986 
October 1986 
October 1986 
October 1986 
October 1986 
October 1986 
October 1986 
October 1986 
October 1986 
October 1986 
October 1986 
October 1986 
September 1987 
September 1987 
September 1987 
September 1987 
September 1987 
October 1986 
October 1986 
September 1987 
September 1987 
4-39 
Proj-ect I 
--

NORFOLK, VA DISTRICT * 
This district comprises the State of Virginia, except the 
Potomac, Roanoke and Ohio River Basins; the entire area 
on the eastern shore of Virginia except for the project for 
Pocomoke River, Maryland and Virginia. On the west shore 
of Chesapeake Bay, all waterways south of Smith Point, 
Virginia, at the mouth of the Potomac River except the 
project for Little Wicomico River, Virginia. North Carolina, 
only the Chowan River Basin downstream to and including 
the mouth of the Meherrin River, and the Dismal Swamp 
Canal Route of the Atlantic Intracoastal Waterway to the 
Albemarle Sound. West Virginia, only the James River 
Basin. 
IMPROVEMENTS 
NAVIGATION PAGE 
1. Atlantic Intracoastal 
Waterway between Norfolk, VA 
and St. Johns River, FL ................... 5-2 
2. Baltimore Harbor and 
Channels (Norfolk District) ............... 5-2 
3. Cape Charles City 
H arbor, VA ............................... 5-3 
4. Chincoteague Inlet, VA ................... 5-3 
5. Finney Creek at 
Wachapreague, VA ....................... 5-4 
6. Hampton Roads and Harbors 
of Norfolk and Newport News, 
VA (Collection and Removal 
of D rift) .............. .................... 5-4 
7. James River, VA .......................... 5-4 
8. Little Machipongo River, VA .............. 5-5 
9. Lynnhaven Inlet, VA ..................... 5-5 
10. Meherrin River, VA ....................... 5-6 
11. Norfolk Harbor and 
Channels (Deepening), VA ................ 5-6 
a. Atlantic Ocean Channel, VA ............ 5-6 
b. Channel to Newport News, VA .......... 5-6 
c. Norfolk Harbor Channels, VA ........... 5-7 
d. Thimble Shoal Channel, VA ............. 5-8 
12. Parker Creek, VA .......................... 5-8 
13. Quinby Creek, VA ........................ 5-8 
14. Rudee Inlet, VA ............................ 5-8 
15. Supervision of the Harbor of 
Hampton Roads (Prevention of 
Obstructive and Injurious Deposits) ........ 5-9 
16. Tangier Channel, VA .................... 5-10 
17. Waterway on the Coast of VA ............. 5-10 
18. Navigation Work Under 
Special Authorization .................... 5-10 
19. Virginia Beach, VA ...................... 5-11 
20. Beach Erosion Control Work 
Under Special Authorization .............. 5-11 
FLOOD CONTROL PAGE 
21. Gathright Dam and 
Lake Moomaw, VA ....................... 5-12 
22. Richmond, VA ........................... 5-12 
23. Saxis Island, VA ......................... 5-12 
24. Scottsville, VA ........................... 5-12 
25. Virginia Beach Streams, 
Canal Number 2, VA ..................... 5-13 
26. Flood Control Work Under 
Special Authorization .................... 5-13 
27. Emergency Flood Control 
Activities ............................. 5-13 
GENERAL INVESTIGATIONS 
28. Surveys ................ ................. 5-13 
29. Collection and Study of 
Basic D ata ............... ............... 5-13 
TABLES 
Table 5-A Cost and Financial Statement .... 5-14 
Table 5-B Authorizing Legislation .......... 5-18 
Table 5-C Data Relative to the 
Completed Locks ................ 5-22 
Table 5-D Other Authorized Navigation 
Projects ......................... 5-23 
Table 5-E Other Authorized Beach Erosion 
Control Projects ................. 5-24 
Table 5-F Other Authorized Flood 
Control Projects .................. 5-24 
Table 5-G Reconnaissance and 
Condition Surveys ............... 5-25 
5-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. ATLANTIC INTRACOASTAL 
WATERWAY BETWEEN 
NORFOLK, VA AND ST. 
JOHNS RIVER, FL 
(NORFOLK DISTRICT) 
Location. Two inland water routes approximately paralleling 
Atlantic coast south of Norfolk, VA between a point in 
Southern Branch of Elizabeth River, VA, 2,500 feet upstream 
of Norfolk & Western Railway bridge and Virginia-North 
Carolina state line in North Landing River, a distance of 
27.2 miles; and 64.6 miles between mouth of Deep Creek, 
VA and mouth of Pasquotank River, NC. These routes are 
shown on National Ocean Service Chart 12206. 
Existing project. A channel 12 feet deep at mean low 
water and 90 to 250 feet wide following Southern Branch of 
Elizabeth River, 5.2 miles, Virginia Land Cut, 8.3 miles, and 
North Landing River, 13.7 miles; and construction of tidal 
guard lock at Great Bridge, VA. It also provides channels 10 
feet deep at mean low water and 90 to 100 feet wide in Deep 
Creek, 3.1 miles, Turners Cut, 4.3 miles and Pasquotank 
River, 35.1 miles; maintaining Dismal Swamp Canal, 22.1 
miles, to about 9 feet deep mean canal level over a width of 
50 feet; protection of banks in Turners Cut with sheet piling, 
and cutting certain sharp points in Pasquotank River to 
shorten its course. (See Table 5-C at end of chapter on Data 
Relative to Completed Locks included in Project.) 
Project includes operating and care of completed locks, 
dams and bridges, under maintenance. Southern Branch of 
Elizabeth River and Deep Creek sections of the two routes 
are tidal, mean range being about 3 feet with extremes of 
minus 3.5 and plus 9.6 feet. Remaining sections are nontidal 
with fluctuations of 1 to 2 feet in level due to winds. Cost for 
new work for completed project was $3,396,276. Protection 
of canal property at Great Bridge portion is considered 
inactive and excluded from foregoing cost. Estimated cost 
of this portion (1954) is $265,000. For details of previous 
projects, see page 476 of Annual Report for FY 1938. (See 
Table 5-B for Authorizing Legislation.) 
Local cooperation. None required. 
Terminal facilities. Existing facilities are considered 
adequate. See Annual Report for FY 1970. 
Operations during fiscal year. Maintenance: Work on 
the 5-year maintenance and repair contract, awarded Feb 
83, is 92% complete and progressing satisfactorily. Other 
operations performed included repairs to the bridge deck at 
Great Bridge and bulkhead replacement at Deep Creek and 
Great Bridge. Ordinary operation and maintenance of the 
project was accomplished to include care of locks and dams, 
condition and operation studies, outgranting, engineering 
and design, supervision and administration. 
2. BALTIMORE HARBOR 
AND CHANNELS 
(NORFOLK DISTRICT) 
Existing project. Provides for deep water approach 
channels in Baltimore Harbor. Northern portion including 
Baltimore Harbor is under jurisdiction of Baltimore District. 
Portion under jurisdiction of Norfolk District is more fully 
described below. 
2A. CAPE HENRY CHANNEL, VA 
Location. At mouth of Chesapeake Bay opposite Cape 
Henry. (See National Ocean Service Chart No. 12222.) 
Existing project. A channel about 2.3 miles long, 1,000 
feet wide, and 50 feet deep at mean low water through shoal 
at mouth of Chesapeake Bay opposite Cape Henry. Under 
ordinary conditions mean range of tide 2.5 feet and extreme 
3 feet. Extremes of irregular fluctuation due to combined 
effect of wind and tides, referred to mean low water, are 
minus 2 feet and plus 9.5 feet. (See Table 5-B for Authorizing 
Legislation.) 
2B. RAPPAHANNOCK SHOAL 
CHANNEL, VA 
Location. In lower Chesapeake Bay opposite mouth of 
Rappahannock River and about 50 miles northerly from 
Atlantic Ocean at entrance of Chesapeake Bay. (See 
National Ocean Service Chart No. 12225.) 
Existing project. A channel about 9.9 miles long, 1,000 
feet wide, and 50 feet deep at mean low water between 
contours of that depth in Chesapeake Bay, opposite 
Rappahannock River. Under ordinary conditions mean tidal 
range is 2.5 feet and extreme 3 feet. Extremes of irregular 
fluctuation due to combined effect of wind and tides, 
referred to mean low water, are minus 2 feet and plus 9.5 
feet. (See Table 5-B for Authorizing Legislation.) 
2C. YORK SPIT CHANNEL, VA 
Location. In lower Chesapeake Bay opposite mouth of 
York River and about 20 miles northerly from Atlantic 
Ocean at entrance of Chesapeake Bay. (See National Ocean 
Service Chart No. 12221.) 
Existing project. A channel about 18.2 miles long, 1,000 
feet wide, and 50 feet deep at mean low water between 
contours of that depth in Chesapeake Bay opposite York 
Spit. Under ordinary conditions mean tidal range is 2.5 feet 
and extreme 3 feet. Extremes of irregular fluctuation, due to 
combined effect of wind and tides, referred to mean low 
water, are minus 2 feet and plus 9.5 feet. For details of 
previousprojects see Annual Report for 1932. (See Table 5- 
B for Authorizing Legislation.) 
Local cooperation. None required. 
Terminal facilities. These three channels form the 
access between lower and upper Chesapeake Bay. 
5-2

NORFOLK, VA DISTRICT 
Operations during fiscal year. New Work and 
Maintenance: Dredging was performed on York Spit 
Channel between Apr - Jun 1987. A total of 1,576,752 cubic 
yards of credited material were removed. Other operations 
performed included condition studies, engineering and 
design and supervision and inspections. 
3. CAPE CHARLES CITY 
HARBOR, VA 
Location. Town of Cape Charles, VA is on Chesapeake 
Bay on west side of peninsula separating the bay from 
Atlantic Ocean. It is about 11 miles north of the southern 
extremity of the peninsula and 45 miles south of Maryland- 
Virginia State line. Cape Charles City Harbor is an artificial 
land-locked harbor on the south side of the town. (See 
National Ocean Service Chart 12222). 
Existing project. A channel 18 feet deep and 500 feet 
wide from that depth in Chesapeake Bay through Cherrystone 
Bar and inlet to the entrance to Cape Charles City 
Harbor, a distance of 2.71 miles; a basin in the harbor of the 
same depth 400 to 800 feet wide and 3,000 feet long; a 
channel 10 feet deep, 100 to 180 feet wide and 260 feet long 
connecting a basin of same depth 180 feet wide and 420 feet 
long at head of Mud Creek, and a harbor of refuge on the 
north side of Mud Creek, 7 feet deep, 200 to 250 feet wide, and 
375 feet long connected to Mud Creek with an entrance 
channel 7 feet deep and 60 feet wide. Project also provides for 
protective works in form of a stone jetty on north side of 
harbor entrance and sand mole 1,350 feet long south of 
harbor entrance. All depths are referred to mean low water. 
Mean tidal range is 2.3 feet with extremes of 2.5 feet below 
and 8 feet above mean low water. Cost for new work for 
completed project was $628,644, including $6,000 from 
contributed funds. Widening the basin an additional 200 
feet is considered inactive and excluded from foregoing cost. 
Estimated cost of this portion (1954) is $207,000. 
Local cooperation. Items of local cooperation in connection 
with Harbor of refuge have been complied with. 
Terminal facilities. The Pennsylvania Railroad owns a 
wooden pier 200 feet long and two transfer ships in the outer 
harbor. On the south side of the harbor, Bay Shore Concrete 
owns an 800-foot bulkhead. A bulkhead providing 200 feet of 
berthing space is on the south side of the main harbor and is 
owned by a fish plant. There are about 1400 feet of cityowned 
bulkhead open to the public. The Coast Guard owns a 
100-foot pier on Mud Creek. The harbor of refuge should 
accommodate about 50 boats when berthing facilities are 
completed. 
Operations during fiscal year. Maintenance: Ordinary 
operation and maintenance was performed consisting 
of condition surveys, engineering and design and supervision 
and inspections. 
4. CHINCOTEAGUE INLET, VA 
Location. Chincoteague Inlet at the southern end of 
Assateague Island provides access to the Atlantic Ocean 
from the inland waterway near the town of Chincoteague, 
VA. (See National Ocean Service Chart 12211). 
Existing project. Provides for a channel 12 feet deep and 
150 feet wide across the ocean bar in the Atlantic Ocean and 
to the mouth of the inlet, a channel 9 feet deep and 100 feet 
wide from the inlet through the canal and then along 
Chincoteague Channel to a point approximately 2,000 feet 
north of the state highway bridge to Chincoteage, a distance 
of about 6.6 miles. Mean range of tide is about 3 feet. All 
depths are referred to mean low water. (See Table 5-B for 
Authorizing Legislation.) 
Local cooperation. For details see Annual Report for 
1974. 
Terminal facilities. Existing facilities at Chincoteague 
are considered adequate for current and prospective traffic. 
Operations during fiscal year. Maintenance: Dredging 
was accomplished between Feb - Jul 1987. There were 
200,000 cubic yards of credited material removed. Other 
work performed consisted of condition surveys, budgeting 
and scheduling, and engineering and design. 
5. FINNEY CREEK AT 
WACHAPREAGUE, VA 
Location. The town of Wachapreague is located on the 
eastern shore of Virginia in Accomack County. Finney 
Creek, a tidual estuary, establishes the eastern boundary of 
the town's limits. 
Existing project. A channel 6 feet deep, 60 feet wide and 
3,000 feet long starting at the 6-foot contour with the 
junction of the Waterway on the Coast of VA and terminating 
at the town-owned public landing. 
Local cooperation. The Local Sponsor (County of Accomack) 
shall: 
(a) Provide and maintain at its own expense all project 
facilities other than those for general navigation. 
(b) Provide all lands, easements, and rights-of-way, including 
dredged material disposal areas and perform all 
relocations or alterations of facilities (except relocations or 
alterations of highway and railroad bridges), determined to 
be necessary for construction, operation, or maintenance of 
the project. 
(c) Perform or assure performance of all utility relocations 
or alterations determined necessary for construction, operation, 
or maintenance of the project. 
(d) Provide during the period of construction, a cash 
contribution equal to 10 percent of the total costs of construction 
of the general navigation facilities assigned to 
commercial navigation. 
5-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
(e) Provide, during the period of construction 50 percent of 
the total costs of the general navigation facilities assigned 
to recreational navigation. 
(f) Repay with interest, over a period not to exceed 30 
years, following the completing of the project, an additional 
0-10 percent of the total costs of construction of the general 
navigation facilities assigned to commercial navigation, 
depending on the value of items provided pursuant to 
paragraph b. above, to the extent such items are allocated to 
general navigation facilities assigned to commercial navigation. 
(g) Pay 100 percent of the cost of operating and maintaining 
the general navigation features of the project assigned 
to recreational navigation. 
(h) Assume full responsibility for all Project costs in 
excess of the Federal cost limitation of $4,000,000. 
Terminal facilities. 
Virginia Institute of Marine Science Laboratory (State 
owned under direction of William and Mary University) 
Public Dock and Landing (Owned by the Town of Wachapreague, 
VA 23480) 
Tyler's Marine Railway (Dave Tyler, RFD, Accomack, VA 
23301) 
Public Landing (Owned by the Town of Wachapreague, 
VA 23480) 
Clam House (Dr. Donald J. Amrien, 204 Willow St., 
Chincoteague, VA 23336) 
Ed Aigner's Marina (Tom Richardson, Wachapreague, 
VA 23480) 
Earl and Ray's Marine Railway (Earl and Ray Packer, 
Wachapreague, VA 23480) 
Wachapreague Lodge and Marina 
Wachapreague Marina and Restaurant (Z. R. Lewis, P. O. 
Box 360, Wachapreague, VA 23450) 
Operations during fiscal year. New Work. Plans and 
specifications for construction were completed this fiscal 
year. 
6. HAMPTON ROADS HARBOR 
OF NORFOLK AND 
NEWPORT NEWS, VIRGINIA 
COLLECTION AND REMOVAL OF DRIFT 
Location. Hampton Roads is a natural harbor 300 miles 
south of New York and 180 miles south of Washington, D.C. 
Its principal tributaries are James River, affording a natural 
deep harbor at Newport News, VA; Elizabeth River, with 
its Southern, Eastern, and Western Branches providing 
harbors for Norfolk and Portsmouth, VA; and Hampton 
Creek, serving the harbor at Hampton, VA. (See National 
Ocean Service Charts No. 12248, 12245 and 12253.) 
Existing project. Collection and removal of drift in 
Hampton Roads and its tributary waters authorizes the 
Secretary of the Army to allot necessary amounts of work 
from appropriations for maintenance and improvement of 
existing river and harbor works or from other available 
appropriations and that this work shall be carried on as a 
separate and distinct project. It is wholly a work of maintenance. 
The purpose of work is to afford relief from variable 
conditions of obstruction. No advance estimate of the 
amount of work is required. (See Table 5-B for Authorizing 
Legislation.) 
Local cooperation. None required. 
Terminal facilities. See Norfolk Harbor, VA and Channel 
to Newport News, VA. 
Operations during fiscal year. Maintenance: Operation 
of the project resulted in collection and disposal of 
63,560 cubic feet of a variety of floating refuse. Operations 
were performed using government plant and hired labor. 
7. JAMES RIVER, VA 
Location. The river is formed by junction of the Cowpasture 
and Jackson Rivers in Botetourt County, VA, flows 
easterly 340 miles and empties into Hampton Roads at 
Newport News, VA. (See National Ocean Service Charts No. 
12248 and 12251.) 
Existing project. A channel 35 feet deep and 300 feet 
wide from the mouth to Richmond Deepwater Terminal, 
and a channel 18 feet deep and 200 feet wide from the 
deepwater terminal to Richmond Lock; a mooring basin 35 
feet deep, 180 to 220 feet wide and 2,100 feet long along 
side the channel opposite waterfront at Hopewell; enlargement 
of the turning basin at Richmond Deepwater Terminal 
to 825 feet wide, 2,770 feet long and 35 feet deep; a turning 
basin minR ichmond Harbor 200 feet wide, 600 feet long and 
18 feet deep; and construction of spur and training dikes. 
Depth of channels are referred to mean low water. Total 
length of channel included in the project is 87 miles, which is 
the navigable section. Mean tidal ranges under ordinary 
conditions for different parts of the river are: mouth, 2.6 
feet; Jamestown, 2 feet; City Point, 2.6 feet; and Richmond, 
3.2 feet. Spring tide ranges under ordinary conditions at the 
same localities are mouth, 3.1 feet; Jamestown, 2.4 feet; 
City Point, 3 feet; Richmond, 3.2 feet. Ordinary fluctuations 
5-4

NORFOLK, VA DISTRICT 
of stage at Richmond, due to floods are 6 to 12 feet above 
mean low water. Extreme fluctuations are 16 to 32 feet. 
Flood heights below Richmond diminish rapidly. The extreme 
according to available information is about 11 feet 
lower at Dutch gap, 14 miles below and 17 to 18 feet lower, 
20 miles below. The estimated (1971) total cost for new work 
is $71,145,940 including required non-Federal cost for conditions 
of local cooperation imposed by the River and 
Harbor Act of 1930, 1945, and 1950, estimated (1939) to be 
$1,949,700; and by the River and Harbor Act of 1962, 
estimated (1971) to be $2,950,000. For previous projects, 
see Annual Report for 1938. (See Table 5-B for Authorizing 
Legislation). 
Local cooperation: Fully complied with for conditions 
imposed by River and Harbor Act of 1962. 
Terminal facilities: River commerce at Richmond is 
handled by city-owned terminals, city wharf, Richmond 
dock, and 16 privately-owned wharfs within or in the 
immediate vicinity of Richmond Harbor. The city's Upper 
Terminal, located on the north bank within the manufacturing 
section of Richmond, provides for 750 feet of concrete 
wharf and 80,000 square feet of warehouse and transit shed. 
The other terminal is located approximately 4 miles downstream 
from the Upper Terminal which provides about 1,250 
feet of wharf and 2 concrete warehouses with about 190,000 
square feet of floor space. This deepwater terminal at the 
head of the 25-foot deep improved channel serves oceangoing 
vessels and larger ships engaged in coastwide trading. 
Below the deepwater terminals the improvement is 
served by 42 wharves. Richmond terminals and wharves 
together with wharves between Richmond and the river's 
mouth are adequate for river's commerce. 
Operations during fiscal year. Maintenance: Dredging 
was performed on the Shoals to Hopewell, and the 
Richmond Deepwater Terminal between Jul - Aug 1987. A 
total of 117,237 cubic yards of material was removed. Other 
operations performed included condition surveys, budgeting 
and scheduling, engineering and design and supervision 
and inspection. 
8. LITTLE MACHIPONGO RIVER, VA 
Location. This river, locally known as 1 arting Creek, 
has its source in the marsh of Bell Neck, Northampton 
County Va., flows in a southerly and easterly direc n 
about 5 miles, and empties into Great Machipongo River, 
about 12 miles by water from Great Machipongo inlet, and 
about 28 miles by water from Cape Charles, Va. The drainage 
area is about 11 square miles. No information is 
available as to the discharge of this stream. The length of 
the tidal reach is about 2 miles. The Great Machipongo Inlet 
and the Great Machipongo River are the waterways connecting 
with the Atlantic Ocean, and have a controlling 
depth of 16 feet. Willis Wharf, a town with a population of 
about 500, is located on the west bank about 1 mile above its 
junction with the Great Machipongo River. The high-water 
width varies from about 450 feet at the mouth to 350 feet at 
Willis Wharf. (See National Ocean Service Chart No. 1221.) 
Existing project. This project provides for a channel 
8 feet deep at mean low water and 80 feet wide from the town 
of Willis Wharf to deep water in the river below. The mean 
range of tide is about 0.7 foot below mean low water to about 
2 feet above mean high water. (See Table 5-B for Authorizing 
Legislation) 
Local cooperation: None required. 
Terminal facilities, at the town of Willis Wharf, there 
are three wharves with a total wharfage space of about 300 
feet, five bulkheads with a total wharfage space of about 
1,140 feet, and two marine railways which will accommodate 
vessels up to 50 feet in length. All facilities are privately 
owned, being used for packing seafoods and servicing 
fishing vessels. The wharves have no railroad connections, 
but are served by local roads connecting with the country 
and State highway system. The facilities are considered 
adequate for existing commerce. 
Operations during fiscal year. Maintenance: Dredging 
was performed Jun 1987. There were 29,467 cubic yards 
of credited material removed. Other operations performed 
included before and after dredging surveys, engineering 
and design and supervision and inspections. 
9. LYNNHAVEN INLET, VA 
Location. On south shore of Chesapeake Bay, 5 miles 
west of Cape Henry, and 10 miles east of Norfolk, VA. Inlet 
connects Lynnhaven Roads, a part of Chesapeake Bay, with 
a network of inland waters in northern half of city of VA 
Beach. (See National Ocean Service Chart No. 1222.) 
Existing project. An entrance channel from Chesapeake 
Bay through Lynnhaven Inlet, 10 feet deep and 150 feet 
wide; a mooring and turning basin inside of Lynnhaven Inlet, 
10 feet deep, 1,100 feet long, and 750 feet wide; a channel 9 
feet deep and 90 feet wide to extend from the mooring and 
turning basin into Broad Bay via Long Creek-Broad Bay 
Canal and a channel through the Narrows connecting Broad 
and Linkhorn Bays, 6 feet deep and 90 feet wide. Depths are 
referred to mean low water. Mean ranges of tide in Lynnhaven 
Inlet is about 2 feet with extreme fluctuations of 1.5 feet 
below and 9.5 feet above mean low water. Range in 
Lynnhaven Bay is a little more than 2 feet, in Broad and 
Linkhorn Bays, fluctuations in water level are caused by 
local winds. (See Table 5-B for Authorizing Legislation.) 
Local cooperation. Complied with, except local interests 
must furnish spoil-disposal areas as needed for future 
maintenance. For details see page 308 of Annual Report for 
1965. 
5-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Terminal facilities. Existing facilities are considered 
adequate. For details, see Annual Report for 1970. 
Operations during fiscal year. Maintenance: Dredging 
was performed or the Entrance Channel, the Turning 
Basin, Long Creek, and Broad Bay Channel during May 
-Jun, 1987. A total of 233,549 cubic yards of material were 
removed. Other operations performed included engineering 
and design, supervision and inspection, and before and 
after dredging surveys. 
10. MEHERRIN RIVER 
Location. Rises in Lunenberg County, VA, flows southeasterly 
about 126 miles and empties into the Chowan River, 
NC, about 39 miles above Albemarle Sound, NC. (See U.S. 
Geological Survey, Winton Quadrangle, NC.) 
Existing project. A channel 10 feet deep from the mouth 
of the State highway bridge at Murfreesboro, about 10.5 
miles, with a cut-off channel through Devil's ElboV4 miles 
above the mouth, 80 feet wide through the cutoff and 100 feet 
wide and 500 feet long, at Murfreesboro. The entire stream is 
nontidal and, except during freshets, its water surface rises 
and falls as winds raise or lower the water level of Albemarle 
Sound. Freshets cause variations of water level from 3 to 4 
feet in the navigable portion of the river. 
The estimate of cost for new work, revised in 1935, 
exclusive of amount expended on previous projects, is 
$46,000. The latest (1950) approved estimate of annual cost 
of maintenance is $3,500. 
Local cooperation. Fully complied with. 
Terminal facilities. The nature and use of private 
wharves, piers and berthing areas has changed since 
project authorization. The project originally provided for 
steamboat lines making regular triweekly trips from Murfreesboro 
to various points on the Chowan River, Albemarle 
Sound, and their tributaries. The commerce carried by the 
vessels consisted of peanuts, fish, cotton, cotton seed, 
fertilizer, tobacco, grain, lumber, and general merchandise. 
The Smith Douglas fertilizer plant and the Standard Oil 
company plant were the major developments located at the 
town clock in Murfreesboro. 
Today the fertilizer facilities are still in use, however the 
use of the Standard Oil Company facilities has changed. 
The Town of Murfreesboro and its historical association 
have plans to promote historical attractions in the downtown 
area. To this end they have acquired the former 
Standard Oil Company site and are making plans for 
providing a terminal for local town boats. Once the tourists 
reach the terminal they will be transported into town to view 
historical attractions. Work incidental to site clearing and 
preparation is planned in FY 88. 
Operations during fiscal year. FY 87 funds were 
expended for permit evaluation and initial work for potential 
snagging and clearing. 
11. NORFOLK HARBOR AND 
CHANNELS (DEEPENING), VA 
The four projects, Atlantic Ocean Channel, VA; Channel 
Newport News, VA; Norfolk Harbor, VA; and Thimble Shoal 
Channel, VA, are grouped under the above heading for 
construction purposes only. Estimated Federal cost (1987) 
for new work for all three projects is $117,000,000, exclusive 
of amounts expended for previous projects. Details of each 
project are given below. 
11A. ATLANTIC OCEAN CHANNEL, VA 
Location. The Atlantic Ocean Channel is located offshore 
of Virginia Beach, VA in the Atlantic Ocean. It 
extends southeastward from a point approximately 3.5 
nautical miles offshore of Cape Henry to approximately 10 
nautical miles offshore of Rudee Inlet, Virginia Beach, VA. 
Previous project. None. 
Existing project. A channel 57 feet deep at mean low 
water, 1,000 feet wide and approximately 10 miles long 
between 57-foot contours in the mouth of the Chesapeake 
Bay and the Atlantic Ocean. 
Local cooperation. See "Norfolk Harbor" writeup. 
Operations during fiscal year. New Work: Preparation 
of the General Design Memorandum for construction was 
completed. 
11B. CHANNEL TO NEWPORT NEWS, VA 
Location. West of north entrance to Norfolk Harbor 
Channel, connects deep water in James River with Hampton 
Roads. (See National Ocean Service Chart 400.) 
Previous project. For details see Annual Report for 
1938. 
Existing project. Dredging a channel 55 feet deep at 
mean low water and 800 feet wide from Norfolk Harbor 
Channel in Hampton Roads to Newport News, a distance of 
about 4.5 miles, and two deep-draft anchorage berths opposite 
Newport News 45 feet deep over a 1,200-foot swinging 
radius. Under ordinary conditions mean tidal range is 2.7 
feet and extremes 2.1 and 3 feet. Extremes of irregular 
fluctuations due to combined wind and tides, referred to 
mean low water, are minus 2 feet and plus 9.5 feet. 
Local cooperation. See "Norfolk Harbor" Writeup. 
Terminal facilities. See Port Series No. 11, (Revised 
1971, Part II) on Ports of Hampton Roads, prepared by 
Board of Engineers for Rivers and Harbors. 
Operations during fiscal year. New Work: Preconstruction 
engineering and design, using Government plant 
and hired labor, was completed for deepening the channel to 
55 feet. Deepening the channel to an intermediate depth of 
50 feet is scheduled for construction during 1988. 
5-6

NORFOLK, VA DISTRICT 
11C. NORFOLK HARBOR CHANNELS, VA 
Location. Norfolk, VA is 187 miles south of Baltimore, 
MD and 30 miles from entrance to Chesapeake Bay at Cape 
Charles and Cape Henry. Harbor extends 18.3 miles from 
40-foot contour in Hampton Roads to a point 2,500 feet above 
Norfolk and Western Railway bridge over a Southern 
Branch of Elizabeth River. (See National Ocean Service 
Chart Nos. 400 and 452.) 
Previous projects. For details see Annual Report for 
1938. 
Existing project. 
HAMPTON ROADS AND ELIZABETH RIVER: A channel 
55 feet deep and 1,500 feet wide from that depth in 
Hampton Roads to a point approximately 6.3 miles upstream 
from the Hampton Roads Bridge-Tunnel; thence 55 
feet deep and 800 feet wide to Lamberts Point; thence 45 feet 
deep and 750 feet wide to the junction of Southern Branch 
and Eastern Branch. 
SOUTHERN BRANCH: A channel 45 feet deep and 450 
feet wide from the junction with the Eastern Branch to the 
Norfolk and Portsmouth Belt Line Railway Bridge; thence 
45 feet deep and 375 feet wide to the Norfolk and Western 
Railway Bridge; thence 40 feet deep and 250 feet to 500 feet 
wide to the U.S. Routes 460 and 13 highway bridge; thence 
35 feet deep and 250 feet to 300 feet wide to a point 0.8 miles 
above Interstate 64 high level bridge. Project includes an 
approach and turning basin 45 feet deep opposite the 
Norfolk Naval Shipyard; a turning basin at the mouth of St. 
Julians Creek 40 feet deep, 400 to 600 feet long, and 800 feet 
wide; a turning basin at the mouth of Milldam Creek 40 feet 
deep and 800 feet square and a turning basin at the mouth of 
Mains Creek, the upstream end of the project, 35 feet deep 
and 800 feet square. 
EASTERN BRANCH: A channel 25 feet deep and 500 feet 
wide from the junction of the branches to Norfolk and 
Western Railway Bridge, from the Norfolk and Western 
Railway Bridge a channel 25 feet deep and 200 feet wide to 
the Campostella Bridge, channel 25 feet deep and 200 feet 
wide to the Norfolk and Western Railway Bridge Bridge 
(formerly Virginian), including a turning basin 25 feet deep 
and approximately 5.5 acres in size located at the upstream 
end of the project. 
WESTERN BRANCH: A channel 24 feet deep and 300 feet 
wide to a point 0.78 mile from the 40-foot channel, thence 24 
feet deep and 200 feet wide for a distance of .38 mile; thence 
18 feet deep and 150 feet wide for 0.57 mile to a point 0.34 mile 
above the West Norfolk Bridge. 
SCOTTS CREEK: A channel 12 feet deep at mean low 
water and 100 feet wide from the 40-foot channel for a 
distance of 0.73 mile. 
ANCHORAGES: Three fixed mooring anchorage facilities 
with a depth of 55 feet, each capable of accommodating 
two large vessels simultaneously; two anchorages opposite 
Sewells Point, 45 feet deep over a swing radius of 2,300 feet; 
anchorage area on the west side of the 55 foot channel 
opposite Lamberts Point aggregating 173 acres consisting 
of oen space 1,500 feet square and 38 feet deep, one space 
1,500 feet square and 35 feet deep, and one space 3,000 feet 
long, 1,000 feet wide and 20 feet deep; and a 45 acre 
anchorage, 12 feet deep, near Pinners Point. 
DISPOSAL AREA: A disposal area of about 2,500 acres 
adjacent to and north of Craney Island, inclosed by stonefaced 
levee of sand; rehandling basin, approach and exit 
channels connecting rehandling basin and Norfolk Harbor 
55-foot channel and hopper dredge unloading facility. 
Local cooperation. The local sponsor (Commonwealth 
of VA) shall: 
(1) Provide without cost to the United States all lands, 
easements, and rights-of-way necessary for implementation 
and later maintenance of the project and for aids to navigation 
upon the request of the Chief of Engineers; including 
suitable areas determined by the Chief of Engineers to be 
required in the public interest for initial and later disposal of 
dredged material; 
(2) Accomplish without cost to the United States, all 
alterations and relocations of buildings, transportation 
facilities, tunnels, storm drains, utilities, and other structures 
and improvements including pier modifications made 
necessary by plan implementation, except for altering or 
replacement costs for obstructive railroad and public highway 
bridges, such costs to be apportioned in accordance 
with the principles of Section 6 of the Bridge Alteration Act 
of 21 Jun 1940, as amended; 
(3) Provide and maintain without cost to the United States 
depths in berthing areas and local access channels serving 
the terminals; 
(4) Hold and save the United States free from damages due 
to implementation, operation, and maintenance of the 
project except where such damages are due to the fault or 
negligence of the United States or its contractors; 
(5) Prohibit the erection of any structures within a distance 
to be determined by the Chief of Engineers from the 
botton edge of the proposed 55-foot, 45-foot, and 40-foot 
channels and turning basin; and 
(6) Provide without cost to the United States, all retaining 
dikes, wasteweirs, bulkheads, and embankments, or the 
costs of such retaining works required for the project 
including all monitoring features and stilling basins. 
Terminal facilities. See Port Series No. 11, (revised 1971, 
Part II) on Ports of Hampton Roads, prepared by Board of 
Engineers for Rivers and Harbors. 
Operations during fiscal year. New Work: The first 
phase of deepening the channel to 50-feet over an outbound 
width of 650 to 800 feet is in progress. Preconstruction 
engineering and design is in progress for deepening the 
40-foot channel to 45 feet over its existing 750 foot width 
from Lamberts Point to the junction of Southern and 
Eastern Branch. 
Preconstruction engineering and design is in progress for 
5-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
deepening the 40-foot channel to 45-feet over its existing 375 
to 450 foot width between the junction of the branches and 
the N & W RR Bridge, for deepening the 35-foot channel to 40 
feet over its existing 250 to 500 foot width from the N & W RR 
Bridge to U.S. Routes 460 and 13 highway bridge, for 
deepening the existing turning basin at the Norfolk Naval 
Shipyard from 40 to 45 feet and deepening the existing 
turning basin at St. Julians Creek from 35 to 40 feet, and for 
constructing the new 40-foot turning basin near Milldam 
Creek. 
Preconstruction engineering and design is completed for 
anchorage improvements in Hampton Roads. Enlarging 
the easternmost anchorage opposite Sewells Point to provide 
a swinging radius of 1,400 feet and depth of 45 feet, and 
construction of a new 55-foot anchorage near the Hampton 
Roads Bridge-Tunnel with a swinging.radius of 1,500 feet 
have been recommended. 
MAINTENANCE: Operation and maintenance of the 
Craney Island portion of the project consisted of dredging 
1,681,024 cubic yards of credited material from the 
Rehandling Basin, operation and maintenance of roads, 
service facilities, rental equipment and government plant, 
engineering and design and supervision and inspection. 
11D. THIMBLE SHOAL CHANNEL, VA 
Location. In lower portion of Chesapeake Bay between 
Hampton Roads and the ocean, 20 miles northeast of center 
of Norfolk Harbor, extending southeasterly 13.4 miles from 
a point 1 miles east of Thimble Shoal Lighthouse toward 
entrance to Chesapeake Bay. (See National Ocean Service 
Chart No. 1222.) 
Previous projects. For details see Annual Report for 
1966. 
Existing projects. Provides for dredging a channel 55 
feet deep at mean low water, 1,000 feet wide and approximately 
13.4 miles long between 55-foot contours in lower 
Chesapeake Bay. 
Local cooperation. See "Norfolk Harbor" writeup. 
Terminal facilities. Project serves an an entrance 
channel to Hampton Roads. See "Norfolk Harbor," "Newport 
News Channel, VA," etc. 
Operations during fiscal year. New Work and Maintenance: 
Preconstruction engineering, and design was 
completed for deepening the channel from 45 to 55 feet. 
Deepening the channel from 45 to an intermediate depth of 
50 feet over an outbound width of 650 feet was in progress at 
year end. Dredging was performed during Mar - May 1987. 
There were 1,380,687 cubic yards of credited material 
removed. Other operations performed included condition 
surveys, budgeting and scheduling and engineering and 
design. 
12. PARKER CREEK, VA 
Location. Parker Creek empties into the western side of 
Metomkin Bay in Accomack County, Virginia. It is on the 
ocean side of Virginia's Eastern Shore, about 20 miles south 
of Maryland-Virginia State line. 
Existing project. The existing project, authorized under 
Section 107 of the 1960 River and Harbor Act, provides for 
establishment and maintenance of a channel 40 feet wide 
and 5 feet deep at mean low water from the same depth in 
Metomkin Bay into the mouth of the creek, a distance of 
about 2,200 feet or 0.5 mile. The existing project was 
completed in 1964 at a cost of $15,530 to the Federal 
Government and $1,350 to local interests. 
Local cooperation. Fully complied with. Non-Federal 
contributions amounted to $1,350. 
Terminal facilities. There are 9 small privately owned 
boat landings and two small public landings on the creek. 
Local interests have also constructed a 50-foot public dock 
with adequate shore facilities. These facilities are deemed 
adequate for existing and prospective commerce. 
Operations during fiscal year. Maintenance: Dredging 
was performed between Sep - Oct 1986. There was 37, 185 
cubic yards of material removed. Other operations performed 
included quantity surveys and supervision and 
inspection. 
13. QUINBY CREEK, VA 
Location. A natural channel on Atlantic Ocean side of 
Delmarva Peninsula about 32 miles north of Cape Charles; 
and about 33 miles south of Chincoteague, Va. Creek 
extends in a generally southeasterly direction between 
Quinby Landing at Quinby, VA and head of Tony Rock 
Drain, in Upshur Bay, a distance of 6,900 feet (See National 
Ocean Service Chart No. 12210). 
Existing project. Provides for a channel 8 feet deep in 
Upshur Bay to a point 600 feet bayward from Quinby 
Landing, thence 60 feet wide to Quinby Landing, a total 
distance of about 6,900 feet and a turning and mooring 
basin of the same depth, 200 feet wide and 400 feet long 
opposite public terminal and landing. Mean range of tide is 
4.4 feet. Existing project was adopted by River and Harbor 
Act of 1950. (H. Doc. 241, 81st. cong., 1st sess. which contains 
latest published map.) Project is complete, for details see 
Annual Report for 1964. 
Local cooperation. Fully complied with for initial construction. 
Local interests provide spoil disposal areas for 
maintenance. 
Terminal facilities. There are two open-pile wooden 
wharves and about 125 feet of wooden bulkhead at Quinby, 
VA, which are privately owned. In addition, a number of 
berthing spaces, a wooden dock and launching ramp were 
5-8

NORFOLK, VA DISTRICT 
constructed and open to all on equal terms. These facilities 
are connected to the State Highway system by a suitable 
access road and are considered adequate. 
Operations during fiscal year. Maintenance: Dredging 
was accomplished Oct - Dec 1986. There were 64,293 
cubic yards of credited material removed. Engineering and 
design and supervision and inspection was performed to 
include before and after dredging surveys. 
14. RUDEE INLET, VA 
Location. Rudee Inlet is located on the Atlantic Ocean at 
Virginia Beach in an area where boating is a major activity. 
It provides a gateway to a variety of oceanic pursuits 
varying from pleasure cruising to commercial deep sea 
fishing. 
Existing project. An entrance channel 10-ft deep, 110 to 
72-ft wide and 1605-ft long; an inner channel 7-ft deep, 72 to 
53-ft wide and 2,495-ft long including a safety area 7-ft deep, 
and approximately 1.9 acres in size and a turning basin 7-ft 
deep, 175-ft wide and 1,570-ft long; a sand trap 18 ft-deep and 
approximately 3.3 acres in size; and a weir and jetty system 
at the mouth of the inlet. 
Local cooperation. The Local Sponsor (The City of 
Virginia Beach) shall: 
(a) Share in paying the total project construction costs, on 
the following basis: 
50% of the cost of general navigation facilities of the 
project assigned to recreational navigation 
10% of the cost of general navigtion facilities of the 
project assigned to commercial navigation; 
(b) Provide without cost to the United States all lands, 
easements, and rights-of-way required for construction and 
subsequent maintenance of the project and for aids to 
navigation upon request of the Chief of Engineers, including 
suitable areas determined by the Chief of Engineers to 
be required in the general public interest for initial and 
subsequent disposal of dredged material, and also necessary 
retaining dikes, bulkheads, and embankments therefore, 
or the cost of such retaining works; 
(c) Hold and save the United States free from damages due 
to the construction, operation and maintenance of the 
project, including, but not limited to failure of shoreline and 
waterway structures such as bulkheads; except where such 
damages are due to the fault or negligence of the United 
States or its contractors; 
(d) Provide, maintain, and operate without cost to the 
United States at least one adequate public landing with 
mooring facilities, and provisions for the sale of engine fuel, 
lubricants, and potable water as needed for transient and 
local crafts as well as necessary access roads, parking areas, 
and other needed public-use shore facilities if the needs of 
traffic so require and none is available. All of the facilities, 
at all times throughout the period of cooperation, shall be 
open and available to the use of everyone on equal terms. It 
is agreed that the presently existing privately operated 
facilities satisfy these conditions; 
(e) Accomplish without cost to the U.S. alterations and 
relocations as required of buildings, sewer, water supply, 
drainage, and other utility facilities; 
(f) Enforce such management techniques for controlling 
erosion and sediment, non-point pollution and runoff in the 
watershed areas of Rudee Inlet, Lake Rudee, Owl Creek, and 
Lake Wesley which have been developed by the Virginia 
State Water Control Board and the Hampton Roads Water 
Quality Agency and promulgated in the Best Management 
Handbook-Urban Planning Bulletin 321 of the Virginia 
State Water Control Board; 
(g) Assume full responsibility for all project construction 
costs in excess of the Federal cost limitation for Section 107 
projects; 
(h) The City in acquiring lands, easements, and rights-ofway 
for project construction, operation and maintenance 
will comply with the provisions of the "Uniform Relocation 
Assistance and Real Property Acquisition Policies Act of 
1970," Public Law 91-646, approved January 2, 1971, and; 
(i) The city will comply with Section 601 of Title VI of the 
Civil Rights Act of 1964, Public Law 88-352, to wit: that no 
person shall be excluded from participation in, denied the 
benefits of, or be subjected to discrimination in connection 
with the project on the grounds of race, color or national 
origin. 
Operations during fiscal year. New Work: Plans and 
specifications were completed and items of local cooperations 
were secured for construction. 
15. SUPERVISOR OF NORFOLK HARBOR 
(PREVENTION OF OBSTRUCTIVE 
AND INJURIOUS DEPOSITS) 
The District Engineer, Norfolk District, was designated 
Supervisor of the harbor of Hampton Roads under the 
provisions of the River and Harbor Act of June 29, 1888 (33 
U.S.C. 441-451) as amended July 12, 1952. Under this Act, the 
Supervisor of the harbor of Hampton Roads is charged with 
the mission of preventing the deposit of obstructive and 
injurious materials in the tidal waters of the harbors of 
Norfolk, Portsmouth, Newport News, Hampton Roads, and 
their adjacent and tributary waters, so much of the Chesapeake 
Bay and its tributaries as lies within the State of 
Virginia, and so much of the Atlantic Ocean and its 
tributaries as lies within the jurisdiction of the United 
States within or to the east of the State of Virginia. The 
River and Harbor Act of March 3,1899 (33 U.S.C. 403,407,409) 
as amended prohibits obstructions to navigable waters such 
as unauthorized structures, unauthorized fill, deposit of 
refuse, and sinking of vessels. Other laws relating to the 
supervision of Norfolk Harbor and its tributary waters are 
the Clean Water Act, the Marine Protection, Research and 
Sanctuaries Act of 1972, the Coastal Zone Management Act 
5-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
of 1969, the Fish and Wildlife Act of 1956, the Federal Power 
Act of 1920, the National Historic Prevention Act of 1966, 
the Endangered Species Act of 1973, the Deepwater Port Act 
of 1972, the Wild and Scenic Rivers Act, and the Land and 
Water Conservation Fund Act. 
Direct supervision of the waters under the jurisdiction of 
the Norfolk District was accomplished by means of two 
patrol vessels performing inspections, debris removal, investigation 
and removal of sunken or abandoned vessels 
and navigational hazards, and support for Federal dredging 
projects. In addition, surveillance of the harbor was 
performed regarding the Corps' regulatory program, using 
also two small outboard craft, motor vehicles from land and 
occasional chartered aerial reconnaissance. This regulatory 
surveillance involved compliance surveys of permitted 
dredging, and evaluation of navigational impacts of proposed 
piers and other structures. 
16. TANGIER CHANNEL, VA 
Location. A tidal channel about 2 miles long extending 
from Tangier Island, Virginia, northeasterly to deepwater 
in Tangier Sound, Chesapeake Bay and northwesterly to 
deepwater on Chesapeake Bay. (See National Ocean Service 
Chart No. 12228.) 
Existing project. A channel 8 feet deep at mean low 
water and 100 feet wide from 8-foot contour to Tangier 
Sound to day marker No. 4, and thence 8 feet deep and 60 feet 
wide to the town of Tangier, with an anchorage basin 
adjacent of town 400 feet square and 7 feet deep. A channel 7 
feet deep and 60 feet wide for about 4,000 feet from the 
anchorage basin northwesterly across Tangier Island to 
Chesapeake Bay. Mean range of tide is 1.7 feet and extreme 
tidal range 4.7 feet. (See Table 5-B for Authorizing 
Legislation.) 
Local cooperation. Complied with except that interests 
must furnish spoil disposal area as needed for future 
maintenance. 
Terminal facilities. Accomack County constructed a 
public dock in 1961. There are four privately owned docks 
adjacent to existing project and two marine railways. 
Operations during fiscal year. Maintenance: Condition 
surveys and engineering and design were accomplished. 
17. WATERWAY ON THE COAST 
OF VIRGINIA 
Location. Between barrier beach along Atlantic Ocean 
on the east and Virginia portion of mainland peninsula on 
the west. It extends for 83.7 miles from south end of 
Chincoteague Bay through a number of creeks, throughfares, 
and bays to enter Chesapeake Bay in the vicinity of 
Fisherman Island, just south of Cape Charles on the 
southern tip of the peninsula. (See National Ocean Service 
Chart Nos. 12211, 12210, and 12221.) 
Existing projects. An inland waterway 6 feet deep at 
mean low water and 60 feet wide from Chesapeake Bay to 
Chincoteague Bay, VA. Mean range of tide is about 3 feet. 
Greater fluctuations in water level are caused by high winds 
and storms. A modification of the project approved during 
1970 under Section 201 of the Flood Control Act of 1965 
authorizes relocation of portions of the waterway and 
widening of 100 feet. (See Table 5-B for Authorizing 
Legislation.) 
Local cooperation. Complied with except that local 
interests are to furnish spoil disposal areas for future 
maintenance. 
Terminal facilities. Existing facilities are considered 
adequate. For details see Annual Report for 1969. 
Operations during fiscal year. Maintenance: Dredging 
was accomplished at Magothy Bay during Mar - Apr 
1987 and Burton's Bay in Apr 1987. A total of 126,718 cubic 
yards of material were removed. 
Other work performed included a long term disposal 
analysis, before and after dredging surveys, condition 
studies, engineering and design and supervision and 
inspection. 
18. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
STUDY/PROJECT 
Meachim's Creek, VA 
Hunting/Guilford 
Creeks, VA 
Scotts Creek, VA 
Little Machipongo 
River, VA 
Bennett Creek, VA 
Kings Creek, VA 
FY 87 
EXPENDITURES 
STATUS 
7,455 Appraisal Report determine 
negative. 
7,964 Reconnaissance study 
terminated due to lack of 
local cooperation. 
24,964 Favorable reconnaissance 
study completed. 
1,434 Plans and specifications 
initiated. 
2,383 Detailed Project Study 
completed. 
600 Detailed Project Report 
determined negative. 
5-10

NORFOLK, VA DISTRICT 
BEACH EROSION CONTROL 
9. VIRGINIA BEACH, VA 
Location. On the Atlantic Seaboard, 22 miles north of 
virginia-North Carolina State line, 3.5 miles south of Cape 
tenry, and 19 miles east of Norfolk, VA. (See National 
Ocean Service Chart 12207.) 
Existing project. Federal participation in restoration 
and protection of shore of Virginia Beach between Rudee 
Inlet and 49th Street by artificial placement of sand to 
provide a minimum beach width of 100 feet at elevation 7 
leet above mean low water, and maintenance of such beach 
by periodic replenishment of losses to insure continuous 
protection; including construction of a groin system to be 
undertaken at such times as estimated annual charges 
therewith would be less than the annual cost of beach 
replenishment alone. The United States shall participate in 
the first cost of the project to the full extent of its proportionate 
share of cost as a landowner, plus one third total first 
cost of restoring and protecting all publicly-owned sections 
of the shore. The 1962 modification provided that the United 
States shall further participate in periodic beach nourishment 
of the beach in the amount of one third the cost for 25 
years from date of commencement of operations in placing 
an initial quantity of nourishment material equal to deficiency 
in the design beach at that time. Section 103 of the 
1962 River and Harbor Act increased Federal participation 
to one-half of the cost incurred after October 23, 1962. 
Estimated Federal cost (1987) is $5,000,000. Estimated cost 
to local interests is $5,000,000. Construction of the groin 
system is not included in the above estimate. The 1962 
estimate for this work was $549,000 Federal cost and 
$531,000 cost to local interests. 
The 1974 modification which provides for structural and 
nonstructural improvements was authorized for construction 
by the Water Resources Development Act of 1986. 
Structural measures will be provided for the 6 mile reach of 
shoreline between Rudee Inlet and 89th Street. This will 
include maintaining the beach at elevation 5.4 feet and a 
width of 100 feet and construction of a stepped-face concrete 
seawall just seaward of the existing bulkhead from Rudee 
Inlet to 58th Street, and raising and strengthening sand 
dunes from 58th to 89th Streets. The estimated cost (1987) of 
the structural improvements are Federal $26,120,000 and 
non-Federal $14,220,000. (See Table 5-B for Authorizing 
Legislation.) 
Local cooperation. Requirements are described in full 
on page 5-11 of Annual Report for FY 81 and for 1962 
modification. For the 1974 modification, local sponsor (The 
City of Virginia Beach) is required to: 
(a) Provide, without cost to the United States, all lands, 
easements, and rights-of-way necessary for construction, 
operation and maintenance of the project; 
(b) Accomplish without cost to the United States such 
utility and other relocations; and alterations as may be 
necessary for project purposes; 
(c) Share in paying the total project construction costs as 
follows. If the costs of lands, easements, rights-of-way, 
relocations and alterations provided by the city for the 
functions of hurricane protection and tidal flooding protection 
are equal to or less than 35 percent of all final first 
costs allocated to said functions, provide a cash amount 
necessary to equal 35 percent of said final costs. The 
allocations shall be based on conditions existing at the time 
of construction; 
(d) Hold and save the United States free from claims for 
damages that may result from construction and subsequent 
operation, maintenance, and public use of the project, except 
where such damages are due to the fault or negligence of the 
United States or its contractors' 
(e) Maintenance and repair of the project and assure the 
local share of periodic beach nourishment, i.e., 50 percent of 
the cost of annual beach nourishment, during the useful life 
of the project as required to serve the project's intended 
purpose; 
(f) Assure continued conditions of public ownership and 
public use of the shore area included within the project 
during the useful life of the project; 
(g) Provide and maintain for the use and benefit of the 
general public throughout the entire project area convenient 
access to the beach, sufficient on and off street parking, and 
other necessary public use facilities needed to accommodate 
reasonably expected beach visitation open to all on equal 
terms; 
(h) Enforce existing ordinances, and any amendments 
thereto which are designed to prohibit unwise future development 
in those areas that would be inundated. 
Operations during fiscal year. New Work: The project, 
as authorized by the River and Harbor Act of 1962, expired 
Feb 87. A re-evaluation report, to extend federal participation 
from 25 years to 50 years, was initiated Jun 87 
with the receipt of $96,000. The report is anticipated to be 
submitted for Division review Jan 88. 
The 1974 modification project is in the preconstruction 
engineering and design phase. The final General Design 
Memorandum is scheduled for completion Sep 30, 1988. 
Completion of the preconstruction engineering and design 
effort through plans and specification is scheduled for Jun 1, 
1989. 
20. BEACH EROSION CONTROL WORK 
UNDER SPECIAL AUTHORIZATION 
None this fiscal year. 
5-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
FLOOD CONTROL 
21. GATHRIGHT DAM AND 
LAKE MOOMAW, VA. 
Location. Site of proposed Gathright Dam is on Jackson 
River, a tributary of James River at mile 43.4 and Alleghany 
County. Gathright Dam site is in reach of Jackson River 
known as the Gorge. About 19 miles upstream from Covington, 
VA at the elevation at the top of the conservation pool. 
Gathright Reservoir will extend upstream about 9 miles (see 
Falling Spring and Mountain Grove, Virginia-West Virginia 
quadrangles of geological survey.) 
Existing project. Gathright Dam consists of a 1,172-foot 
long rolled rock fill dam with an impervious core, with a top 
at elevation 1,684.5; outlet works consisting of a concrete 
intake structure located in the right bank 500 feet upstream 
from the axis of the dam: a 1,075-foot long outlet tunnel 
through the right abutment and a stilling basin; and a 2,450- 
foot long fixed crest emergency spillway excavated in a low 
saddle in the divide at Fortney Branch, about 2.5 miles 
south of the dam. Discharges through the maximum conservation 
pool elevation 1,582 will be provided for water quality 
control. The reservoir area at elevation 1,582 will be 2,530 
acres. A total of 302,000 acre-feet of storage between elevation 
1,582 and the spillway crest (elevation 1,663.5) will be 
reserved for flood control. At the spillway crest the reservoir 
will have an area of 4,540 acres. Last approved estimated 
Federal cost (1979) is $83,000,000. (See Table 5-B for Authorizing 
Legislation.) 
Local cooperation. None required. 
Operations during fiscal year. New Work: $300,000 
paid to W. G. Construction Corp. to finance settlement of 
project claim for time and associated delay costs. 
Maintenance: Operations performed this fiscal year 
consisted of care of service and recreational facilities, water 
contrpl management, testing and monitoring, supervision 
and administration and engineering and design. 
22. RICHMOND, VA. 
Location. The city of Richmond, the capital of Virginia, 
is located in the Piedmont Plateau and is bordered on the 
north by Henrico County and on the south by Chesterfield 
County. The James River flows directly through Richmond 
separating its business district into two areas, the Shockoe 
Creek area on the north bank and the industrial-commercial 
complex on the south bank. 
Previous project. None. 
Existing project. The project will provide a system of 
floodwalls and levees on both sides of the river in the 
downtown area, which would protect against a flood higher 
than that which occurred in June 1972 which is the maximum 
flood of recent record. The project to be constructed is 
that generally described in House Document 98-178, 98th 
Congress, 2nd Session with modifications recommended by 
the Assistant Secretary of the Army on February 21, 1984. 
The present construction cost of the project is now estimated 
at $90,300,000. 
Local Cooperation. Fully complied with. For details see 
Annual Report for 1986. 
Operations during fiscal year. New Work: Preconstruction 
engineering and design continued with economic 
studies, hydraulics and hydrology, geotechnical investigations, 
subsurface explorations and structural engineering. 
Construction is scheduled for Feb 88 with the first phase 
demolition at the southside alignment and completion 
scheduled for Sep 1993. 
23. SAXIS ISLAND, VA. 
Location. Located adjacent to the town of Saxis, VA, in 
Accomack County. This Eastern Shore island is approximately 
80 miles north of Norfolk, VA, and 100 miles 
southeast of Washington, D.C. 
Previous project. None. 
Existing project. Shoreline erosion threatens a public 
landing owned by Accomack County and located at the 
southern end of Saxis Island. The threatened public landing 
is currently protected by a timber bulkhead which is in 
danger of immediate failure due to erosion. Consideration 
was given to a cantilever steel sheet pile wall and an 
anchored timber system. However, the recommended plan 
provides for construction of an anchored timber bulkhead 
along the northern and western portions of the landing. 
Local cooperation. Fully complied with. For details see 
Annual Report for 1986. 
Operations during fiscal year. New Work: Construction, 
initiated the end of Fiscal Year 86, was completed this 
fiscal year. 
24. SCOTTSVILLE, VA. 
Location. The town of Scottsville, VA is located in 
Albemarle and Fluvanna Counties, on the north bank of the 
James River, 185 miles above its mouth. 
Previous project. None. 
Existing project. The town encompasses 130 acres and 
the 1980 population was 250. It includes small commercial 
establishments and dwellings including many of historical 
value. A relatively large tire manufacturing plant is located 
adjacent to the town in Albemarle County and is the largest 
employer in the area with about 270 employees. 
5-12

NORFOLK, VA DISTRICT 
Local cooperation. Requirements are described in full 
on page 5-11 of FY 85 Annual Report. 
Operations during fiscal year. New Work: Construction, 
initiated in FY 85, is continuing. Work performed 
consisted of engineering and design and supervision and 
inspection. 
25. VIRGINIA BEACH STREAMS 
CANAL NUMBER 2, VA 
Location. The canal number 2 watershed with a 
drainage area of about 37 square miles lies within the city of 
Virginia Beach. The city consists of 255 square miles of 
primarily low, flat terrain with about 75 percent of the area 
below elevation 15 feet, mean sea level. The existing canal, 
from the Eastern Branch of the Lynnhaven River to the 
North Landing River is about 12 miles long and follows a 
north-south alignment. (See National Ocean Survey Chart 
No. 12205.) 
Existing project. The project will provide for 
channelization of an existing canal for a length of 1.1 miles. 
The canal bottom width will range from 45 feet to 80 feet and 
a depth from -4 feet mean sea level to -8 feet mean sea level 
with a flow capacity great enough to carry a 100 year flood. 
Its construction will require dredging 741,000 cubic yards of 
material. 
Local cooperation. Requirements are described in full on 
page 5-14 of FY 81 Annual Report. Requirements may 
change if legislation is enacted regarding new cost-sharing 
proposals. 
Operations during fiscal year. New Work: Plans and 
specifications were completed in preparation for construction 
and the items of local cooperation were secured. 
26. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION. 
The District was reimbursed for 9 unfavorable Initial 
Appraisal Reports: Jackson River at Scottsville, VA; Jackson 
River at Covington, VA; Jackson River, Industrial Park, 
VA; Piney River, VA; St. Mary's River, VA; Little Calfpasture 
River, VA; Glasgow River, VA; Goshen, VA; and 
Ramsey's Draft, VA. Total expenditures amounted to 
$67,065. 
27. EMERGENCY FLOOD CONTROL 
ACTIVITIES. 
During FY 87 $132,649 was spent on the National Emergency 
Preparedness Program. 
GENERAL INVESTIGATIONS 
28. SURVEYS. 
Total cost of surveys during the fiscal year amounted to 
$452,575. Work performed consisted of: Flood Control 
Studies,; Supplemental Preauth Studies Flood Control, 
121,303; Review of Authorized Projects, 58,289; Shoreline 
Protection Studies, 52,625; Coordination Studies with Other 
Agencies, 42,000; Special Investigations, 35,000; FERC 
Licensing, 3,000; and Navigation Studies, 2,998 
29. COLLECTION AND STUDY 
OF BASIC DATA. 
During the fiscal year, cost of collection and study of Basic 
Data was $119,383, consisting of $52,389 for Management 
Service Unit, $57,055 for Technical Service, and $9,939 on a 
Hurricane Evacuation Study. 
5-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 5-A COST AND FINANCIAL STATEMENT 
See Total Cost 
Sect. Project Funding FY 84 FY 85 FY 86 FY 87 To 30 Sep 1987 
in Tect 
1. Atlantic Intracoastal 
Waterway, between 
Norfolk, VA and the 
St. John's River, FL 
(Norfolk Dist) 
(Regular Funds) 
2. Baltimore Harbor and 
Channels 
(Norfolk Dist) 
(Regular Funds) 
3. Cape Charles City 
Harbor, VA 
(Regular Funds) 
4. Chincoteague Inlet, 
VA (Regular Funds) 
(Contributed Funds) 
5. Fi.nney Creek at 
Wachapreague, VA 
6. Hampton Roads and 
Harbors of Norfolk 
and Newport News, 
VA Collection and 
Removal of Drift 
(Regular Funds) 
7. James River, VA 
(Regular Funds) 
(Contributed Funds) 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
Major Rehab 
Approp 
Cost 
Recreation 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
1,213,817 2,570,649 1,964,374 2,699,229 
2,343,728 2,521,787 1,931,265 2,723,252 
40,000 
200,690 
32,724 
33,977 
1,381,182 
1,484,896 
169,526 
221,568 
88,000 
88,001 
968,902 
967,792 
113,223 
113,222 
918,015 
917,618 
178,241 
178,209 
127,604 
127,518 
495,612 
184,301 
65,107 1,041,410 
65,508 1,041,409 
24,500 
20,861 
185,105 
185,163 
814,658 1,538,877 2,311,895 
1,076,147 1,430,155 2,312,981 
56,000 
19,755 31,512 
63,000 
15,127 
3,639 
260,000 
257,865 
935,997 
1,045,823 
8,063 
5-14 
3,688,3721 
3,688,372 
47,868,5642 
47,806,539 
479,947 
479,947 
59,871 
59,871 
8,015,0733 
8,015,073 
9,773,992 
9,772,796 
622,6444 
622,644 
1,102,543 
791,231 
227,000 
227,000 
6,485,924 
6,485,923 
3,850 
3,850 
24,500 
24,500 
3,200,984 
3,198,849 
7,639,9045 
7,639,904 
29,459,478 
29,458,412 
413,456 
368,913

NORFOLK, VA DISTRICT 
TABLE 5-A (Cont.) COST AND FINANCIAL STATEMENT 
See Total.Cost 
Sect. Project Funding FY 84 FY 85 FY 86 FY 87 To 30 Sep 1987 
In Text 
8. Little Machipongo 
River, VA 
(Regular Funds) 
9. Lynnhaven Inlet, VA 
10. Meherrin River, VA 
(Regular Funds) 
11. Norfolk Harbor 
and Channels 
(Deepening), VA 
(Regular Funds) 
(Contributed Funds) 
11A. Atlantic Ocean 
Channel, VA 
(Regular Funds) 
(Contributed Funds) 
11B. Channel to 
Newport News, VA 
(Regular Funds) 
(Contributed Funds) 
11C. Norfolk Harbor, VA 
(Regular Funds) 
(Contributed Funds) 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
67,500 
39,163 
5,590 
5,590 
83,414 
83,372 
11,000 
28,579 
64,811 
64,809 
2,424 
84,934 
84,735 
510,456 
510,498 
1,434 
243,262 
243,463 
670,611 
670,607 
5,173 
5,173 
91,809 2,075,000 4,615,000 
- 2,042,215 2,625,036 
- - 2,945,000 
- - 2,239,892 
19,201 
19,202 
1,400,715 
1,400,335 
208,750 
218,413 
316,470 
320,816 
(2,589) 
(2,459) 
19,203 1,278,130 
- 1,214,701 
(8,897) 
625 
178,371 
130,937 
(100) 
(100) 
54,000 
49,784 
386,827 
386,484 
4,627,375 3,816,880 5,369,398 3,031,795 
9,369,636 3,739,813 4,840,919 3,259,794 
- - - 134,500 
- - - 112,104 
93,500 
86,600 
473,590 
473,590 
445,354 
445,354 
2,768,646 
2,768,642 
54,764 
54,764 
6,781,8096 
4,667,251
.6
-6 
2,945,0006 
2,239,8926 
_6 
_6 
219,0546 
219,038 
.6 
514,0436 
451,753 
5,718,660 
5,718,410 
54,0006 
49,784 
1,684,1606 
1,601,185 
77,929,4497 
77,548,900 
134,5006 
112,104 
5-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 5-A (Cont.) COST AND FINANCIAL STATEMENT 
See Total Cost to 
Sect. Project Funding FY 84 FY 85 FY 86 FY 87 30 Sep 1987 
In Text 
11D. Thimble Shoal 
Channel, VA 
(Regular Funds) 
(Contributed Funds) 
12. Parker Creek, VA 
(Regular Funds) 
13. Quinby Creek, VA 
(Regular Funds) 
14. Rudee Inlet, VA 
(Regular Funds) 
15. Supervision of 
Harbor of Hampton 
Roads, VA 
(Regular Funds) 
16. Tangier Channel, VA 
(Regular Funds) 
17. Waterway on the 
Coast of VA 
(Regular Funds) 
19. Virginia Beach, VA 
(Regular Funds) 
(Contributed Funds) 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
39,979 
69,860 
34,203 
65,729 
65,729 
21,000 
20,999 
129,000 
156,489 
230,912 
274,501 
425 
247,759 
247,229 
536,348 
536,346 
175,000 
547,251 
430,000 
384,330 
212,000 
211,272 
9,747 
271,650 4,058,699 
288,285 2,106,990 
188,611 
169,820 
2,756,500 
2,078,004 
29,329 
29,328 
40,766 
30,766 
30,000 
29,482 
260,225 
261,036 
76,399 
76,401 
76,419 
76,421 
292,910 
302,910 
10,000 
545 
354,000 
348,498 
7,915 
7,915 
1,048,097 1,027,841 
900,425 1,174,569 
330,000 
361,017 
605,000 
569,030 
5-16 
4,364,5526 
2,395,275 
11,214,344 
11,195,552 
2,756,5006 
2,078,004 
34,000 
15,530 
224,392 
224,392 
104,176 
104,176 
1,064,883 
1,064,883 
235,000 
224,993 
5,457,824 
5,452,322 
116,550 
116,550 
2,422,744 
2,422,744 
850,498 
850,498 
11,938,570 
11,936,817 
4,875,195 
4,806,060 
204,683 
204,683

NORFOLK, VA DISTRICT 
TABLE 5-A (Cont.) COST AND FINANCIAL STATEMENT 
See Total Cost to 
Sect. Project Funding FY 84 FY 85 FY 86 FY 87 30 Sep 1987 
In Text 
21. Gathright Dany and New Work 
Lake Moomaw, VA Approp - - - 300,000 80,970,527 
(Regular Funds) Cost - - - 298,670 80,969,197 
Maint 
Approp 820,000 870,000 880,842 919,322 8,177,164 
Cost 914,128 852,484 851,948 916,775 8,120,267 
22. Richmond, VA New Work 
(Regular Funds) Approp - - 1,613,179 1,153,000 2,766,179 
Cost - - 1,602,465 1,055,916 2,658,381 
23. Saxis Island, VA New Work 
(Regular Funds) Approp - 37,700 20,000 215,900 273,600 
Cost - 21,670 14,693 237,237 273,600 
24. Scottsville, VA New Work 
(Regular Funds) Approp 213,500 3,090,000 100,000 3,403,500 
Cost 47,345 151,884 722,029 1,024,288 1,945,546 
25. Virginia Beach New Work 
Streams, Canal Approp - 15,000 408,000 1,200,000 2,043,000 
Number 2, VA Cost 10,864 7,088 43,661 28,022 491,683 
1 Includes $292,096 for previous projects. 
2 Includes $52,804 for previous projects. 
3 Costs prior to 1942 are included in the project "Baltimore Harbor and Channels, MD (Baltimore District). Costs listed are for York 
Spit Channel, VA; Cape Henry Channel, VA and Rappahannock Channel, VA 
4 Includes $445,291 military funds expended from new work dredging on existing project and $83,041 expended military funds for 
construction of a wharf. 
5 Includes $763,000 for previous projects. 
6 Excludes previous projects. See Annual Report for FY 1986. 
SIncludes $72,039 for previous projects. 
5-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 5-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
ATLANTIC INTRACOASTAL WATERWAY BETWEEN 
NORFOLK, VA. AND ST. JOHNS RIVER, FLA. 
(NORFOLK DISTRICT) (See Section 1 of Text) 
Mar. 3, 1899 Existing project dimensions and original route, waterway 
from Norfolk, Va. to sounds of North Carolina 
July 25, 1912 
July 25, 1912 
Mar. 3, 1925 
Original route to Norfolk-Beaufort Inlet section 
Purchase of Albemarle & Chesapeake Co. Canal 
Purchase of Lake Drummond Canal (Dismal Swamp Canal) 
July 3, 1930 Construct a tidal lock at Great Bridge at a cost not to exceed 
$500,000 
June 26, 1934 Operating and care of works of improvement provided for with 
funds from War Department appropriations for rivers and 
harbors 
Mar. 2, 1945 Construct dikes for protection of canal property against 
floodtides 
H. Doc. 317, 54th Cong., 1st sess. 
AR 1896 
H. Doc. 131, 55th Congs., 3d sess. 
AR 1899 
H. Doc. 391, 62d Congs., 2d sess. 
H. Doc. 589, 62d Cong., 2d sess. 
Rivers & Harbors Comm. Doc. 
67th Cong., 2d sess. 
S. Doc. 23. 71st Cong., 1st sess.' 
Not available 
H. Doc. 117, 76th Cong., 1st sess. 
July 3, 1958 
Dec. 31, 1970 
July 3, 1958 
Dec. 31, 1970 
Mar. 3, 1905 
Mar. 4, 1913 
July 3, 1930 
Mar. 2, 1945 
July 3, 1958 
Dec. 31, 1970 
Sept. 19, 1890 
July 14, 1960 
(Sec. 107) 
July 14, 1960 
(Sec. 107) 
BALTIMORE HARBOR AND CHANNELS (NORFOLK 
DISTRICT) (See Section 2 of Text) 
CAPE HENRY CHANNEL, VA. (See Section 2 of Text) 
A channel 42 feet deep, 1,000 feet wide 
Channel depth increased to 50 feet 
RAPPAHANNOCK SHOAL CHANNEL, VA. 
(See Section 2 of Text) 
Channel 42 feet deep and 800 feet wide 
Channel width increased to 1,000 feet and depth increased 
to 50 feet. 
YORK SPIT CHANNEL, VA. (See Section 2 of Text) 
Channel 35 feet deep, 600 feet wide 
Channel width increased to 1,000 feet 
Channel depth increased to 37 feet 
Channel depth increased to 39 feet 
Channel depth increased to 42 feet 
Channel depth increased to 50 feet 
CAPE CHARLES CITY HARBOR, VA (See Section 3 of Text) 
Dredging a channel through Cherrystone Inlet and bar 
CHINCOTEAGUE INLET, VA (See Section 4 of Text) 
Existing Project 
FINNEY CREEK AT WACHAPREAGUE, VA 
(See Section 5 of Text) 
Construct a channel 6 feet deep, 60 ft wide and 3,000 ft long 
H Doc. 86, 85th Cong., 1st sess. 
Chief of Engineers Report Sept. 21, 19i 
H Doc. 86. 85th Cong., 1st sess. 
Chief of Engineers Report, Sept. 21, 1970 
H. Doc. 186, 57th Cong., 2d sess. 
H. Doc. 190, 62d Cong., 3d sess. 
H. Doc. 29, 71st Cong., 1st sess. 
H. Doc. 741, 79th Cong., 2d sess. 
H. Doc. 86, 85th Cong., 1st sess. 
Chief of Engineers Report Sept. 21, 1970 
Unknown 
Approved in 1972 
Approved in 1986 
HAMPTON ROADS AND HARBORS OF NORFOLK AND 
NEWPORT NEWS, VA. COLLECTION AND REMOVAL 
OF DRIFT (See Section 6 of Text) 
Collection and removal of floating debris in Hampton Roads andSpecified in Act 
its tributary waters. 
5-18 
May 17, 1950

NORFOLK, VA DISTRICT 
TABLE 5-B (Cont.) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
and training dikes 
Extension of improvement to Richmond lock gate 
Form a turning basin by widening channel at Richmond 
Channel 25 feet deep mouth to Richmond Deepwater Terminal 
Removal of Trigg cofferdam 
Turning basin at Richmond Harbor 
Maintaining turning basin at Richmond Deepwater Terminal 
Channel depth increased to 35 feet to Richmond Deepwater 
Terminal 
LITTLE MACHIPONGO RIVER, VA (See Section 8 of Text) 
Jul. 3, 1930 Existing Project. 
Oct. 23, 1962 
July 14, 1960 
(Sec. 107) 
LYNNHAVEN INLET, VA (See Section 9 of Text) 
Existing Project 
Long Creek, Lynnhaven Inlet Modification 
MEHERRIN RIVER, VA (See Section 10 of Text) 
Mar. 2, 1907 Removal of Shoals and obstructions to make river safely 
navigable for vessels of less than 7-foot draft 
Aug. 30, 1935 
Oct. 17, 1986 
Oct. 17, 1986 
Mar. 2, 1907 
June 25, 1910 
Aug. 8, 1917 
Sept. 3, 1954 
Oct. 27, 1965 
Oct. 17, 1986 
Present project dimensions 
NORFOLK HARBOR AND CHANNELS (DEEPENING), VA 
(See Section 11 of Text) 
ATLANTIC OCEAN CHANNEL, VA 
(See Section 11A of Text) 
Construct a 60 foot channel 
CHANNEL TO NEWPORT NEWS, VA 
(See Section 11B of Text) 
Deepen existing 45-foot channel 
to 55-feet 
NORFOLK HARBOR CHANNEL, VA 
(See Section 11C of Text) 
Hampton Roads and Elizabeth River 
Channel 30 feet deep to Navy Yard 
Depth of 35 feet to Navy Yard. 
Depth of 40 feet and width of 750 feet to mouth of Southern 
Branch. 
Widen 40-foot channel to 1,500 feet from 40-foot contour in 
Hampton Roads to a point just south of Norfolk 
International Terminal. 
45 feet deep Ft. Wool to Lambert Point, 800 feet wide Norfolk 
International Terminal to Lambert Point. 
Deepen existing 45 foot channel to 55 feet deep 
JAMES RIVER, VA. (See Section 7 of Text) 
July 5, 1884 Channel 22 feet deep from mouth of Richmond and construct spur 
H. Doc. 1013, 99th Cong., 
2nd Sess. 
H. Doc. 381, 59th Cong., 1st sess. 
H. Doc. 551, 61st Cong., 2d sess. 
H. Doc. 140, 65th Cong., 1st sess. 
S. Doc. 122, 83rd Cong., 2d sess. 
H. Doc. 187, 89th Cong., 1st sess. 
H. Doc. 1013, 99th Cong., 2nd Sess. 
5-19 
S. Ex. Doc. 714, 47th Cong., 1st sess. 
H. Doc. 234, 56th Cong., 1st sess. 
H. Doc. 234, 56th Cong., 1st sess. 
H. Doc. 314, 71st Cong., 2d sess. 
Rivers & Harbors Comm. Doc. 68 
74th Cong., 1st sess. 2 
H. Doc. 738, 77th Cong., 2d sess. 
H. Doc. 191, 81st Cong., 1st sess. 
H. Doc. 586, 87th Cong.,2d sess. 
H. Doc. 260, 71st Cong., 2d sess. 
H. Doc. 580, 87th Cong., 2nd Ses. 
Approved in 1982 
H. Doc. 137, 59th Cong., 
1st Ses. 
Rivers and Harbors Committee 
Doc. 43, 74th Cong. 1st Sess. 
(Contains latest published map) 
H. Doc. 1013, 99th Cong., 2nd Sess. 
June 13, 1902 
Mar. 3, 1905 
July 3, 1930 
Aug. 26, 1937 
Mar. 2, 1945 
May 17, 1950 
Oct. 23, 1962

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 5-B (Cont.) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
June 25, 1910 
Aug. 8, 1917 
Mar. 30, 1925 
Aug. 30, 1935 
June 30, 1948 
Oct. 27, 1965 
Oct. 22, 1976 
Oct. 17, 1986 
SOUTHERN BRANCH 
Channel with a depth of 22 and 25 feet. 
Depth of 40 feet and width of 450 feet from mouth to Belt Line 
RR Bridge. 
Channel 30 feet deep and 375 feet wide to Virginia Ry bridge: 
thence 25 feet deep and generally 200 feet wide to Norfolk & 
Western RR Bridge. 
Depth of 25 feet and width of 200 feet from Norfolk & Western 
RR bridge to a point 2,500 feet above with a turning basin 500 
feet square. 
Approach and turning area 40 feet deep and a maximum width 
of 830 feet opposite Norfolk Naval Shipyard: thence a channel 
35 feet deep and 375 and 250 feet wide to a point 1900 feet 
above Norfolk & Western RR bridge and a turning basin 35 
feet deep and 600 feet at upstream end 
45 feet deep Belt Line bridge to Old Virginia bridge, 35-foot 
deep turning basin opposite St. Julians Creek. 
Extend existing 35-foot project to a channel 35 feet deep and 
250 feet wide upstream 1.5 miles to the Norfolk and 
Portsmouth Belt Line RR bridge and a turning basin at the 
mouth of Mains Creek 35 feet deep and 800 feet square. 
Deepen existing 40-foot portions to 45-feet deep 
Deepen portion of the 35-foot, from mile point 15 to 
Gilmerton Bridge, to 40 feet deep 
H. Doc. 551, 61st Cong., 2d sess. 
H. Doc. 140, 65th Cong., 1st sess. 
H. Doc. 226, 68th Cong., 1st sess. 
H. Doc. 182, 73d Cong., 2d sess. 2 
H. Doc. 545, 80th Cong., 2d sess. 
H. Doc. 187, 89th Cong., 1st sess. 
H. Doc. 355, 94th Cong., 2d sess. 
H. Doc. 1013, 99th Cong., 2nd Sess. 
EASTERN BRANCH 
Mar. 2, 1907 Width of 500 feet and depth of 25 and 22 feet. 
Removel of shoals at mouth. 
Mar. 3, 1925 Depth of 25 feet and width of 200 feet from Norfolk & Western 
RR bridge to Virginia RR bridge. 
July 3, 1930 30-foot channel to a point opposite terminal of Imperial 
Tobacco Co. in Berkley. 
Mar. 2, 1945 Depth of 25 feet and width of 300 feet from Norfolk & Western 
RR bridge to Campostella bridge. 
WESTERN BRANCH 
Mar. 4, 1913 Channel 24 feet deep and 300 & 400 feet wide to West 
Norfolk highway bridge. 
July 3, 1930 For 18-foot channel to a point about 3,000 feet above West 
Norfolk highway bridge. 
July 3, 1930 
June 25, 1910 
Aug. 8, 1917 
Sept. 3, 1954 
Oct. 27, 1965 
Oct. 17, 1986 
SCOTTS CREEK 
Channel 12 feet deep and 100 feet wide toa point 100 feet above 
the Atlantic Coast Line RR bridge. 
ANCHORAGES 
30-foot anchorage at Lambert Point 
12-foot anchorage at Pinner Point 
An anchorage 38 feet deep and 1,500 feet square: anchorage 
35 feet deep and 1,500 feet square: and an anchorage 20 
feet deep, 1,000 feet wide and 3,000 feet long. 
Two anchorages opposite Sewells Point 45 feet deep with 
1,200-foot swinging radius. 
Construct a 55-foot anchorage and increase the radius 
to 1500 feet for an existing 45-foot anchorage 
H. Doc. 373, 59th Cong., 1st sess. 
Specified in act 
H. Doc. 226, 68th Cong., 1st sess. 
H. Doc. 37, 71st Cong., 1st sess. 3 
H. Doc. 224, 76th Cong., 1st sess. 
H. Doc. 556, 62nd Cong., 2d sess. 
H. Doc. 265, 70th Cong., 1st sess. 
H. Doc. 189, 70th Cong., 1st sess. 
H. Doc. 551, 61st Cong., 2d sess. 
H. Doc. 605, 63rd Cong., 2d sess.' 
S. Doc. 122, 83rd Cong., 2d sess.' 
H. Docs. 187 & 143, 89th Cong., 1st sess. 
H. Doc. 1013, 99th Cong., 2nd Sess. 
5-20

NORFOLK, VA DISTRICT 
TABLE 5-B (Cont.) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 8, 1917 
Sep. 3, 1954 
Oct. 27, 1965 
Oct. 17, 1986 
Jul. 14, 1960 
(Sec. 107) 
May 17, 1950 
Oct. 17, 1986 
Mar. 2, 1919 
Jan. 3, 1934 
(P.W.A. Act) 
& Aug. 30, 1935 
Mar 2, 1945 
Jul. 14, 1960 
(Sec. 107) 
June 25, 1910 
Mar. 2, 1945 
Oct. 27, 1965 
(Sec. 107) 
Sept. 3, 1954 
Oct. 23, 1962 
Mar. 7, 1974 
July 24, 1946 
Aug. 15, 1985 
Oct. 17, 1986 
July 24, 1946 
1948 (Sec. 205) 
Oct. 27, 1965 
(Sec. 201) 
THIMBLE SHOAL CHANNEL, VA 
(See Section 11D of Text) 
A channel 40-feet deep and 750 feet wide 
Channel width increased to 1,000 feet with side 
channels on either side 32-feet deep and 450 feet wide. 
A channel 45 feet deep and 100 feet wide 
Deepen existing 45-foot channel to 55-feet 
PARKER CREEK, VA (See Section 12 of Text) 
Existing Project 
QUINBY CREEK, VA (See Section 13 of Text) 
Existing Project 
RUDEE INLET, VA (See Section 14 of Text) 
Project Authorized 
TANGIER CHANNEL, VA (See Section 16 of Text) 
Channel from Tangier Sound and anchorage 
Modified project dimensions 
Channel across Tangier Island 
WATERWAY ON THE COAST OF VIRGINIA 
(See Section 17 of Text) 
Existing project adopted. 
Project modified. 
Project widened to 100 feet, partially relocated, and 
incorporated in Delaware Bay-Chesapeake Bay Waterway 
in Delaware-Maryland-Virginia 
H. Doc. 140, 65th Cong., 1st Sess. 
H. Doc. 122, 83rd Cong., 2nd Sess. 
H. Doc. 187, 89th Cong., 1st Sess. 
H. Doc. 1013, 99th Cong., 2nd Sess. 
Approved in 1964. 
H. Doc. 241, 81st Cong., 1st Session 
H. Doc. 1013, 99th Cong., 2nd Sess. 
H. Doc. 107, 63rd Cong., 1st Sess. 
Rivers and Harbors Comm. 
Doc. 51, 72nd Cong., 2d sess. 
H. Doc. 141, 77th Cong., 1st sess. 
Approved in 1964 
H. Doc. 957, 60th Cong. 1st Sess. 
H. Doc. 268, 76th Cong., 1st Sess. 
Approved in 1970 
VIRGINIA BEACH, VA (See Section 19 of Text) 
Project authorized. H. Doc. 186, 83rd Cong., 1st Sess. 
Project modified. H. Doc. 382, 87th Cong., 2nd Sess. 
Project modification authorized for Phase I Advanced H. Doc. 365, 92nd Cong., 2nd Sess 
Engineering and Design. 
GATHRIGHT DAM AND LAKE MOOMAW, VA (See Section 21 of Text) 
Project authorized. H. Doc. 325, 61st Cong., 2nd Sess. 
RICHMOND, VA (See Section 22 of Text) 
Existing project. 
Project authorized for construction. 
SAXIS ISLAND, VA (See Section 23 of Text) 
Existing project. 
SCOTTSVILLE, VA (See Section 24 of Text) 
Project approved. 
VA. BEACH STREAMS, CANAL NO.2, VA. BEACH, VA. 
(See Section 25 of Text) 
Project authorized. 
H. Doc. 178, 98st Cong., 2nd Sess. 
H. Doc. 1013, 99st Cong., 2nd Sess. 
Approved in 1986. 
H. Doc. 551, 84th Cong., 1st Sess. 
H. Doc. 640, 94th Cong., 2nd Sess. 
5-21 
1 Contains latest published map. 3 For latest published map. See H. Doc. 1246. 62d Cong., 3d Sess. 
2 Included in Emergency Relief Administration Program May 23, 1935. 
>.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 5-C 
ATLANTIC INTRACOASTAL WATERWAY BETWEEN 
NORFOLK VA. AND ST. JOHNS RIVER, FLORIDA: 
DATA RELATIVE TO THE COMPLETED LOCKS 
(See Section 1 of Text) 
Dimensions 
Greatest 
Length Depth on 
Width Avail- Year 
of able Miter Sills Opened 
Miles Chain- for Full Character to 
from Location ber Width Lift Upper Lower of Navi- Cost 
Norfolk, Va. feet (feet) (feet) (feet) (feet) Foundation gation 
12.4 Albemarle and Chesa- 75 600 2.7 Piles in sand 1932 $499,913 
peake Canal (Great and shells 
Bridge, Va.) 
10.7 Dismal Swamp Canal 52 300 12 12 12 Natural earth 1940 $348,879 
(Deep Creek) with cutoff 
walls 
33.1 Dismal Swamp Canal 52 300 12 12 13 Natural earth 1941 $372,556 
(South Mills, N.C.) with cutoff walls 
'16 feet at mean low water 
5-22

NORFOLK, VA DISTRICT 
TABLE 5-D OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Full Cost to Sept. 30, 1987 Additional Expenditure 
Project Report, See For New Work 
Annual Report Expended From 
For Construction Maintenance Contributed Funds 
Appomattox River, Va. 1 1980 $870,341 $863,140- 
Aberdeen Creek, Va.2 1975 109,643 200,893- 
Blackwater River, Va. 
Active portion2 
11 1975 342,118 151,735 19,300 
Broad Creek, Va.2 1986 27,888 568,418 500 
Carters Creek, Va 
Active portion2 
3 1951 28,398 3,277- 
Channel to Newport News, Va. 1985 8,955,974 5,720,969- 
Channel from Phoebus, Va. 
to deepwater in Hampton Roads2 1944 11,500 32,442 1,200 
Channel connecting York River, Va 
Back Creek to Slaights Wharf 2 1950 14,855 36,874 2,500 
Chesconessex Creek, Va.2 1968 25,516 31,889- 
Chincoteague Bay, Va. 1984 25,126 371,984- 
Chincoteague Harbor of Refuge, Va. 1985 49,396 132,327- 
Chowan River, N.C. 2 1975 107,220 - 5,700 
Cockrells Creek, Va.4 1949 - - - 
Cranes Creek, Va. 1986 6,274 394,556- 
Davis Creek, Va.2 1971 97,612 158,323 4,000 
Deep Creek, Accomack Co., Va. 1974 83,000 39,675- 
Deep Creek, Newport News, Va.2 1980 288,278 2,054,201- 
Dymers Creek, Va.2 1953 5,582 4,610- 
Greenvale Creek, Va.2 1986 20,003 223,125- 
Hampton Creek, Va. 1981 186,237 1,116,952 62,969 
Horn Harbor, Va.2 1964 13,987 88,488- 
Hoskins Creek, Va.2 1977 44,100 622,801 500 
Jackson Creek, Va.2 1971 8,500 34,437- 
Jarvis Creek, Va.4 1979 39,259 -- 
Kings Creek, Va.4 1957 5,593 -- 
Lafayette River, Va.2 1982 242,047 153,598 188,962 
Little River (Creek), Va.2 
13 1966 168,623 442,033 16,955 
Locklies Creek, Va.2 1928 11,581 9,560- 
Millford Haven, Va.2 1950 24,568 32,322- 
Mill Creek, Va.2 1937 5,445 4,346- 
Mulberry Creek, Va.2 1950 2,393 2,458- 
Nandua Creek, Va.2 1950 6,988 39,804- 
Nansemond River, Va.6 1978 167,477 426,777- 
Newport News Creek, Va.2 1962 135,600 147,570- 
Nottoway River, Va.2 1986 44,295 8,734 43,000 
Occohannock Creek, Va. 
Active portion2 1951 13,859 78,283 
Onancock River, Va.2 5 1963 187,914 427,233 
Oyster Channel, Va.2 1984 119,117 630,353 
Pagan River, Va.2 
6 1950 51,425 284,381 
Pamunky River, Va. 
Active portion2 1964 31,376 161,183 
Parrotts Creek, Va.2 1957 37,045 37,771 
Portsmouth Harbor, Va. Channel to 
Nansemond Ordnance Depot 2 1947 165,566 66,162 
Queens Creek2 1979 26,949 101,803 
Rappahannock River, Va. 9 10 12 1983 414,633 1,958,360 
Rappahannock Riverat 
Bowlers Wharf, Va.4 1950 
5-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Starlings Creek, Va. 
Taskinas Creek, Va. 
Totuskey Creek, Va. 
Tylers Beach, Va.2 
Urbanna Creek, Va.2 7 
Whitings Creek, Va. 
Winter Harbor, Va.2 
Willoughby Channel, Va.2 
Wishart Point Channel, Va.2 
York River, Va. 
Active portion2 
1Includes $22,500 for previous projects. 
2Completed. 
31n addition, $700 for maintenance was expended from 
contributed funds. 
4lnactive. 
5lncludes $33,549 for new work and $24,754 for maintenance 
for previous projects. 
6lncludes $20,671 for new work for previous projects. 
TABLE 5-E OTHER AUTHORIZED BEA( 
71n addition, $61,087 was expended for rehabilitation. 
8lncludes $30,000 for new work and $7,000 for maintenance 
for previous projects. 
91n addition, $168,091 was expended for rehabilitation. 
10lncludes $197,146 for previous new work projects. 
"Includes $15,000 for new work for previous projects. 
12lncludes $113,500 for previous maintenance projects. 
13Federal funds expended by the U.S. Navy for new work. 
CH EROSION CONTROL PROJECTS 
For Last Full Cost to Sept. 30, 1987 Additional Expenditure 
Project Report, See For New Work 
Annual Report Expended From 
For Construction Maintenance Contributed Funds 
Anderson Park, 1979 S471,474 - $176,671 
Newport News, Va. 
Hampton Institute 1976 . $156,906 - $175,845 
TABLE 5-F OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Full Cost to Sept. 30, 1987 Additional Expenditure 
Project Report, See For New Work 
Annual Report1 Expended From 
For Construction Maintenance Contributed Funds 
Buena Vista, Va. 1977 $ 417.900- 
Newmarket Creek, Va. 1970 1,000,000 12,283 $550,097 
Norfolk Floodwall, Va. 1973 1,851,933 32,877 516,256 
Richmond Filtration Plant, Va. 1985 478,224 - - 
Salem Church Lake, Va. 1976 1,896,716 - - 
'Preconstruction planning terminated. 'lncludes $144,785 for previous projects. 
5-24 
1981 
1975 
1970 
1982 
1963 
1971 
1981 
1953 
1975 
1986 
66,242 
7,479 
167,869 
261,201 
55,724 
21,630 
171,334 
8,500 
118,762 
180,904 
603,632 
135 
450,693 
404,943 
106,868 
112,333 
291,048 
42,485 
102,244 
204,854 
2,000 
500 
2,973 
30,625

NORFOLK, VA DISTRICT 
TABLE 5-G RECONNAISSANCE AND CONDITION SURVEYS 
PROJECT NAME MONTH/YEAR TYPE OF SURVEY 
Atlantic Intracoastal Waterway 
Dismal Swamp Canal 
Baltimore Harbors and Channels, VA 
Cape Henry Channel 
Broad Creek, VA 
Channel to Newport News, VA 
Newport News Anchorage 
Chincoteague Bay, VA 
Chincoteague Inlet, VA 
Cranes Creek, VA 
Davis Creek, VA 
Deep Creek, Newport News, VA 
Horn Harbor, VA. 
James River, VA 
Richmond Harbor to DWT 
City Point Shoal 
Jordan PT - Windmill PT - Harrison PT 
Richmond Harbor 
DWT to Hopwell 
Little Creek, VA 
Newport News Creek, VA 
Norfolk Harbor, VA 
Eastern Branch Elizabeth River 
Western Branch Elizabeth River 
Oyster Channel, VA 
Queens Creek, VA 
Tangier Channels, VA 
Tylers Beach, VA 
Urbanna Creek, VA 
Waterway on the Coast of VA 
Metompkin Bay 
Horn Harbor 
Onancock River 
Magothy Bay 
Eckichy Marsh Channel 
Chesapeake Bay to Magothy Bay 
Northam Narrows and Kegotank Bay 
Gargathy Inlet 
Feb87 
Jun 87 
Jul 87 
Nov 86 
Oct 86 
Mar87 
Jun 87 
Oct 86 
Dec 86 
May 87 
Nov 86 
Nov 86 
Dec 86 
Apr87 
Feb87 
Jun 87 
May 87 
May 87 
Jun 87 
Oct 86 
Oct 86 
Oct 86 
Dec 86 
Jul 87 
Oct 86 
Oct 86 
Oct 86 
Nov 86 
Feb 87 
Jul 87 
Apr87 
Feb 87 
Recondition 
Condition 
Condition 
Condition 
Condition 
Condition 
Condition 
Condition 
Condition 
Condition 
Condition 
Condition 
Condition 
Condition 
Condition 
Condition 
Recondition 
Condition 
Condition 
Condition 
Condition 
Condition 
Condition 
Condition 
Condition 
SCondition 
Condition 
Condition 
Condition 
Condition 
Condition 
Condition 
5-25

WILMINGTON, N. C., DISTRICT * 
This district comprises central and eastern North 
Carolina and a portion of south-central Virginia, embraced 
in drainage basins tributary to the Atlantic Ocean from 
the southern boundary of Virginia to the Shallotte River, 
inclusive, with exception of the Meherrin River Basin 
above Murfreesboro, N. C., the Chowan River Basin above 
the confluence of the Nottaway and Blackwater Rivers, 
and the Pasquotank River and its tributaries for navigation 
only. Also included are those portions of the Yadkin- 
Pee-Dee and Catawba River basins within the state of 
N. C. as well as a portion of the Atlantic Intracoastal 
Waterway from the northern boundary of North Carolina 
to Little River, S. C., and a portion of the waterway from 
Norfolk, Va., to the Sounds of North Carolina, south of the 
north shore of Albemarle Sound. 
IMPROVEMENTS 
Navigation Page 
1. Aquatic Plant Control 
(R & H Act of 1965)....... ................... 6-2 
2. Atlantic Intracoastal Waterway 
Between Norfolk, Va. and St. Johns 
River, Fla. (Wilmington District)........ ...... 6-2 
3. Beaufort Harbor, N. C........ ................ 6-4 
4. Belhaven Harbor, N. C.......................6-4 
5. Cape Fear River, N. C. Above Wilmington....... 6-5 
6. Channel from Back Sound to 
Lookout Bight, N. C.........................6-5 
7. Far Creek, N. C................. ............ 6-5 
8. Lockwoods Folly River, N. C.. ............... 6-6 
9. Manteo (Shallowbag) Bay, N. C................6-6 
10. Morehead City Harbor, N. C...................6-7 
11. Ocracoke Inlet, N. C.........................6-8 
12. Shallotte River, N. C........................6-8 
13. Silver Lake Harbor, N. C.....................6-8 
14. Waterway Connecting Pamlico Sound 
and.Beaufort Harbor, N. C...................6-8 
15. Wilmington Harbor, N. C.....................6-9 
Flood Control 
16. Ararat River, Mount Airy, N. C............... 6-10 
17. Cape Fear River Basin, N. C..................6-10 
17A. B. Everett Jordan Dam and Lake, N. C.........6-10 
17B. Randleman Lake, N. C.......................6-11 
18. Carolina Beach and Vicinity, N. C............6-11 
19. Neuse River Basin, N. C....................6-12 
19A. Falls Lake, N. C...................... .6-12 
20. Scuppernong River, N. C.....................6-12 
21. Stuart, Va....... ..................... 6-13 
Page 
22. Yadkin River Basin, N. C. and S. C............. 6-13 
22A. W. Kerr Scott Dam and 
Reservoir, N. C............. ............... 6-13 
23. Inspection of Completed 
Flood Control Projects.....................6-14 
24. Flood Control Work Under 
Special Authorization......................6-14 
Multiple-Purpose Projects, 
Including Power 
25. Roanoke River Basin, Va. and N. C............6-14 
25A. John H. Kerr Dam and Reservior, 
Va. and N. C................... ............ 6-14 
25B. Philpott Lake, Va................ ........... 6-15 
26. Scheduling Flood Control 
Reservoir Operations......................6-15 
General Investigations 
27. Surveys ..... ................. ........... 6-16 
28. Collection and Study of Basic Data........... 6-16 
29. Continuation of Planning 
and Engineering...........................6-17 
30. Preconstruction Engineering and Design..... 6-17 
Tables Page 
Table 6-A Cost and Financial Statement......... 6-18 
Table 6-B Authorizing Legislation.............6-22 
Table 6-C Other Authorized 
Navigation Projects................6-25 
Table 6-D Other Authorized Beach Erosion 
Control Projects...................6-26 
6-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Page 
Other Authorized Flood Control 
Projects................. ........... 6-27 
Not Applicable 
Deauthorized Projects............... 6-28 
Reconnaissance and 
Condition Surveys ................... 6-29 
Table 6-I Navigation Work Under 
Special Authorization...............6-29 
Table 6-J Dams and Reservoirs................6-30 
Table 6-K Flood Control Work Under 
Special Authorization................ 6-31 
Navigation 
1. AQUATIC PLANT CONTROL (RIVER AND HARBOR 
ACT OF 1965) 
Location. Navigable waters, tributary streams, connecting 
channels, and other allied waters in Wilmington 
District. 
Existing project. The existing project provides for control 
and progressive eradication of water-hyacinth, 
alligatorweed, Eurasian watermilfoil, and other obnoxious 
aquatic plant growths from navigable waters, tributary 
streams, connecting channels, and other allied waters of 
the United States, in the combined interest of navigation, 
flood control, drainage, agriculture, fish and wildlife conservation, 
public health, and related purposes, including 
continued research for development of the most effective 
and economic control measures in cooperation with other 
Federal and State agencies in accordance with the report 
of the Chief of Engineers, House Document 251, 89th Congress, 
1st session. The project was authorized by Section 
302, 1965 River and Harbor Act (H.D. 25, 89th Cong., 1st 
sess.). The Act provides that research and planning costs 
shall be borne fully by the United States. 
Local cooperation. Local interests must agree to hold 
the United States free from damages that may occur from 
operations performed in connection with this project, and 
participate to the extent of 30 percent (50 percent after FY 
1987) of the cost of the program. Requirements are being 
met. 
Operations and results during fiscal year. New work: 
Operations for FY87 included chemical and biological control 
efforts on 209 acres of hydrilla and chemical control on 
94 acres of alligatorweed. The only chemical hydrilla control 
site was Big Lake in William B. Umstead Park where 
14 acres of hydrilla were treated with Sonar. Three Lakes 
were stocked with triploid grass carp, including Lake 
Wheeler, Fred Bond Park Lake, and Lake Rogers. Triploid 
grass carp were first introduced into Lake Wheeler in the 
fall of 1985 at a rate of 20 fish per vegetated acre to control 
a 100-acre infestation of hydrilla with marginal results. 
Lake Wheeler was restocked (at the same rate) in the spring 
of FY87. Two new sites, Fred Bond Park Lake (25 acres 
of hydrilla) and Lake Rogers (70 acres of hydrilla) were 
stocked at a rate of 20 fish per vegetated acre in FY 87. 
All alligatorweed control in FY 87 was by the application 
of rodeo herbicide. The Scuppernong River and 
navigable tributaries remained under maintenance control 
with only 8 acres requiring treatment. Major drainage 
canals in the Scuppernong Basin required an additional 12 
acres of treatment. Alligatorweed in the Little River Basin 
required limited applications that totaled about 5 acres. 
The Pasquotank River Basin was added as a treatment 
area in FY86. Excellent results from last year's treatment 
on the Pasoquotank River (over 40 percent reduction in 
the infested area) reduced our FY87 treatment needs to 15 
acres. New alligatorweed treatment areas for FY87 included 
the Lumber River, New River and major tributaries, 
and Sweetwater Creek (a tributary to the Roanoke River). 
The Lumber River and Sweetwater Creek were heavily infested 
with alligatorweed, with reaches from 90 to 100 percent 
covered. FY87 treatment acres at these sites were 37 
to 17, respectively. The New River had a relatively minor 
infestation (about 3 acres); however, herbicide application 
was made to preclude significant weed problems from occurring 
in the future. 
Planning efforts included investigations and the preparation 
of Supplement to the Environmental Assessment 
for the inclusion of new alligator weed control sites in the 
Lumber River, New River, and Roanoke River Basins and 
studies for inclusion of Lake Rogers as a hydrilla control 
site. Studies for the inclusion of Egeria sp. as a new problem 
plant species are ongoing. Several reconnaissance investigations 
of aquatic weed problems in response to requests 
by others were also made in FY87. Control work 
was accomplished for $42,595. Planning was accomplished 
at a Federal Cost of $31,339. 
Condition at end of fiscal year. No hydrilla is known to 
be growing in any of the Umstead State Park Lakes at this 
time; however, tubers are present and regrowth is expected. 
It appears that all three lakes in Umstead State 
Park may require herbicide treatment in FY88. The sterile 
triploid grass carp stocked in Lake Wheeler provided control 
throughout the FY87 recreation season and long-term 
control is expected.Some weed reduction may occur by 
FY88 in Fred Bond Lake and Lake Rogers; however, good 
control is not expected until the following year. 
Alligatorweed is under maintenance control in the Scuppernong 
River, Little River, New River and their major 
tributaries. These sites should require only spot 
treatments in FY88. The Scuppernong River Canals, Pasquotank 
River, Lumber River, and Sweetwater Creek will 
require extensive weed-control operations. 
Investigations of acquatic weed problems, in response to 
requests by county governments and municipalities, may 
result in the addition of new treatment sites and species in 
future years. 
2. ATLANTIC INTRACOASTAL WATERWAY 
BETWEEN NORFOLK, VA., AND ST. JOHNS 
RIVER, FLA. (WILMINGTON DISTRICT) 
6-2 
Tables 
Table 6-E 
Table 6-F 
Table 6-G 
Table 6-H

WILMINGTON, N. C., DISTRICT 
Location. The project is located on the east coast of the 
United States, between Norfolk, Va., and St. Johns River, 
Florida. The section within Wilmington District begins at 
the Virginia-North Carolina State line and extends 
generally southerly and southwestwardly to Little River, 
S. C., a total of 308 statute miles. (See Coast and Geodetic 
Survey Charts 830 to 842, inclusive.) 
Previous projects. For details see Annual Reports for 
1915, 1926, 1932, and 1938. 
Existing project. The authorized project provides for a 
waterway, 12 feet deep, with widths varying from 90 feet 
in land cuts to 300 feet in open waters; the construction, 
operation and maintenance of suitable bridges; saltwaterintrusion 
preventive measures in the vicinity of Fairfield, 
N. C.; a channel in Peltier Creek, 6 feet deep and 50 feet 
wide from the Intracoastal Waterway in Bogue Sound to 
and including a basin in Peltier Creek, 6 feet deep, 200 feet 
wide, and 600 feet long; a channel, 6 feet deep and 90 feet 
wide between the Intracoastal Waterway and the gorge in 
Bogue Inlet, then 8 feet deep and 150 feet wide across the 
ocean bar; a channel, 12 feet deep and 90 feet wide to a 
turning basin, 200 feet wide and 350 feet long, at 
Swansboro; a channel, 6 feet deep and 90 feet wide in New 
River Inlet, and a connecting channel of the same dimensions 
to the Intracoastal Waterway near the mouth of New 
River; a channel, 10 feet deep, and 90 feet wide in New 
River, between the Intracoastal Waterway and the 
Seaboard Coastline Railroad bridge at Jacksonville, N. C.; 
a channel through New Topsail Inlet, 8 feet deep and 150 
feet wide and a channel from New Topsail Inlet to the Intracoastal 
Waterway by way of Old Topsail Creek, 7 feet 
deep and 80 feet wide; a channel, 7 feet deep and 80 feet 
wide, in Banks Channel, from New Topsail Inlet, paralleling 
the barrier beach, to the Atlantic Intracoastal Waterway; 
a channel, 14 feet deep and 400 feet wide, across the 
ocean bar at Masonboro Inlet, with suitable jetties at the 
entrance, thence 12 feet deep and 90 feet wide to the channel 
of the Intracoastal Waterway at Wrightsville by way 
of Banks and Motte Channels; a turning basin, 15 feet 
deep, 300 feet wide, and 700 feet long, on the east side of 
Banks Channel near Masonboro Inlet, with three 15-pile 
dolphins therein; a channel, 8 feet deep and 150 feet wide 
across the ocean bar at Carolina Beach Inlet to the Atlantic 
Intracoastal Waterway; a channel, 6 feet deep, 80 feet 
wide, and 8,000 feet long, to and including a turning basin 
of the same depth, 130 feet wide and 180 feet long, at 
Carolina Beach; a yacht basin, 230 feet wide, 450 feet long, 
and 12 feet deep, at the town of Southport, connected to 
the waterway by a suitable channel of the same depth; and 
maintenance of the general navigation features of the 
North Carolina State Ports Authority Small-Boat Harbor 
at Southport, consisting of an entrance channel, 150 feet 
wide and 400 feet long, an eastern harbor-access channel, 
70 feet wide and 430 feet long, a western harbor-access 
channel, 60 feet wide and 185 feet long, to a turning basin, 
180 feet wide and 550 feet long, all to a depth of 6 feet. A 
modification providing for the replacement of five Federally 
owned and operated highway bridges was authorized in 
December 1970. A modification providing for 100 percent 
Federal funding for Walter B. Jones (formerly Wilkerson 
Creek) and Joseph P. Knapp (formerly Coinjock) bridges 
was authorized in October 1976. A modification providing 
for 100 percent Federal funding at Core Creek, Hobucken, 
and Fairfield bridges was authorized in November 1986. 
Estimated Federal cost is $60,700,000 (1987). The tidal lock 
at Snow's Cut was deauthorized September 23, 1986, 
under authority of Sec. 12, PL 93-251. The 12 feet deep 
channel in Peltier Creek was deauthorized by the Water 
Resources Development Act of 1986. The south jetty at 
Masonboro Inlet has an estimated Federal cost of 
$9,210,000 (1987) and is complete except for the training 
wall. A Section 111 project to mitigate damages caused by 
the north jetty was authorized in October 1980 and was 
completed in April 1981. Length of channels and basins 
total 347.7 miles. Plane of reference is mean low water. 
In the waterway north of Neuse River, variations in 
water surface due to winds seldom exceed 2 feet above or 
below mean stage. Between Beaufort and the Cape Fear 
River, normal tidal range varies from 3.5 feet at the inlets 
to 1 foot at points between. Average range of tide is 4 feet 
on the ocean side of Bogue Inlet and 2.5 feet just inside the 
inlet. At New River, tidal range varies from 3.5 feet at the 
inlet to 1 foot at the head of the marshes and zero at Tar 
Landing, 31 miles above. From Cape Fear River, N. C., to 
Little River, S. C., mean tidal range varies between 4.7 
feet in Cape Fear River and 4 feet at the intermediate inlets, 
and 2 feet at points midway between the inlets. On October 
15, 1954 (Hurricane Hazel), the tide at Holden Beach 
reached an elevation of 17.6 feet. (See Table 6-B for 
Authorizing Legislation.) 
Local cooperation. Fully complied with to date except 
for the uncompleted modifications. The State of North 
Carolina has agreed to keep the bridges toll free and upon 
completion of each bridge, accept maintenance, replacement, 
and ownership responsibilities thereof. They have 
withdrawn their offer to contribute 25 percent of the first 
cost. The Water Resources Acts of 1976 and 1986 modified 
the terms of local cooperation to delete the non-Federal 
cost-sharing requirement for all five bridges. 
Operations and results during fiscal year. New work: 
Joseph P. Knapp Bridge (formerly Coinjock) was completed 
at a cost of $85,503. Design of Core Creek Bridge 
was initiated at a cost of $26,951. The supplement for the 
Masonboro Inlet South Jetty GDM cost $1,258. 
Maintenance: Through Channel - During intermittent 
periods the U. S. debris boat Snell conducted clearing and 
snagging operations and maintained dredging ranges and 
mooring facilities at a cost of $147,750. Between December 
12, 1986 and May 8, 1987, the contract dredges Northwood 
II and Hampton Roads removed 389,283 cubic yards from 
shoals in the through channel and at inlet crossings at a 
cost of $1,214,344. Between January 23 and September 30, 
1987, the contract dredge Richmond removed 301,252 
cubic yards from shoals in the through channel between 
Swansboro and the South Carolina state line at a cost of 
$1,269,675. Between March 24 and September 10, 1987, the 
contract dredges Clinton and Cherokee removed 524,741 
cubic yards from shoals in the through channel at a cost of 
$1,662,270. Costs in connection with prior and current year 
pipeline dredging was $6,070. Design costs for dredging in 
FY 1988 was $14,490. Marking of easements along the 
AIWW cost $19,016. Easement and boundary surveys in 
6-3

REPORT OF TIE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Onslow County cost $1,164. Disposal area stabilization at 
Swansboro and Sneads Ferry cost $278,420. Mosquito control 
in disposal areas cost $36,526. Archeological investigations 
of sounds and inlets cost $1,935. Structural repairs to 
three remaining bridges cost $511,727. Emergency repairs 
to Fairfield Bridge cost $333,725. Condition and operation 
studies cost $380,372. Periodic inspection of three remaining 
bridges cost $55,369. Three highway bridges and 
utilities were operated and maintained at a cost of 
$489,851. Bogue Inlet - During intermittent periods the 
U. S. sidecasting dredge Merritt removed 163,639 cubic 
yards from shoals in Bogue Inlet and channel at a cost of 
$331,535. During intermittent periods the U. S. hopper 
dredge Currituck removed 96,983 cubic yards from shoals 
in Bogue Inlet at a cost of $174,116. Costs in connection 
with the Snell was $1,446. Condition and operation studies 
cost $16,260. Carolina Beach Inlet - During intermittent 
periods the U. S. sidecasting dredge Merritt removed 
28,917 cubic yards from shoals in Carolina Beach Inlet at a 
cost of $45,089. During intermittent periods the U. S. hopper 
dredge Currituck removed 240,275 cubic yards from 
shoals in Carolina Beach Inlet at a cost of $379,315. During 
intermittent periods the U. S. sidecasting dredge Fry 
removed 1,036 cubic yards from shoals in Carolina Beach 
Inlet at a cost of $8,100. Monitoring of Carolina Beach Inlet 
cost $45,393. Marine archeological survey of wrecks cost 
$17. Condition and operation studies cost $34,881. Masonboro 
Inlet - Prior year pipeline dredging cost was $945. 
Monitoring at Masonboro Inlet was $57,695. Condition and 
operation studies cost $844. New River Inlet - During intermittent 
periods the U.S. sidecasting dredge Fry removed 
94,785 cubic yards from shoals in New River at a cost of 
$265,249. During intermittent periods the U. S. sidecasting 
dredge Merritt removed 100,839 cubic yards from shoals 
in New River Inlet at a cost of $254,898. During intermittent 
periods the U. S. hopper dredge Currituck removed 
28,955 cubic yards from shoals in New River Inlet at a cost 
of $44,751. Archeological investigations cost $1,680. Condition 
and operation studies cost $31,635. New Topsail Inlet 
- During intermittent periods the U. S. sidecasting 
dredge Fry removed 102,033 cubic yards from shoals in 
New Topsail Inlet at a cost of $180,152. During intermittent 
periods the U. S. sidecasting dredge Merritt removed 
50,286 cubic yards from shoals in New Topsail Inlet at a 
cost of $95,596. During intermittent periods the U. S. hopper 
dredge Currituck removed 33,015 cubic yards from 
shoals in New Topsail Inlet at a cost of $110,865. Costs in 
connection with the Snell was $1,446. Condition and operation 
studies cost $30,726. 
Condition at end of fiscal year. The project was completed 
in September 1983 except for the training wall, three tieup 
dolphins at Masonboro Inlet and the three remaining 
bridges. Coinjock Bridge was completed on November 13, 
1986. Design of Core Creek Bridge was initiated in FY 
1987.Total cost for existing project to September 30, 1987 
was $124,474,339, of which $41,737,731 was for new work 
including $86,851 in contributed funds and $82,736,608 was 
for maintenance, including $667,300 in contributed funds. 
3. BEAUFORT HARBOR, N. C. 
Location. The project is just inside Beaufort Inlet, adjacent 
to Morehead City Harbor. (See Coast and Geodetic 
Survey Chart 420.) 
Previous projects. For details see Annual Reports for 
1915 and 1938. 
Existing project. The authorized project provides for 
stopping erosion at Beaufort Inlet by jetties and sand 
fences at Fort Macon and Shackleford points and other 
shore protection; channels 15 feet deep at mean low water 
and 100 feet wide in Bulkhead and Gallants Channels, except 
for a depth of 12 feet in the upper 5,000 feet of 
Gallants Channel; a harbor of refuge in Town Creek 12 feet 
deep, 400 feet wide, and 900 feet long connected to 
Gallants Channel by a channel 12 feet deep, 150 feet wide, 
and 1,400 feet long; a basin 12 feet deep, 600 feet wide in 
front of the town of Beaufort except for a channel 15 feet 
deep, 100 feet wide through the basin; a stone bulkhead 
from Town Marsh across Bird Shoal to the west end of 
Carrot Island; a channel 14 feet deep, 70 feet wide, and 
1,900 feet long from Bulkhead Channel to a turning basin 
14 feet deep, 150 feet wide and 300 feet long near the upper 
end of Morgan Creek; and a channel in Taylors Creek 
15 feet deep, 100 feet wide, extending about 2.6 miles 
easterly from about opposite Marsh Street in Beaufort to 
Lennoxville Point at North River, except for an 800-footlong 
section at the east end which is 12 feet deep. Total 
length of channels is 7.3 miles. Average tidal range is 2.5 
feet at Beaufort and 3.5 feet at the inlet. (See Table 6-B for 
Authorizing Legislation.) 
Local cooperation. Fully complied with to date. 
Terminal facilities. There are fifty waterfront facilities 
with a total frontage of 2,000 feet. These facilities are adequate 
for present commerce. 
Operations and results during fiscal year. Maintenance: 
Between December 9, 1986 and March 23, 1987, the contract 
dredgeRichmond removed 147,573 cubic yards from 
shoals in Bulkhead Channel, Taylors Creek and Morgan 
Creek at a cost of $380,490. Between September 1 and 10, 
1987, the contract dredge Clinton removed 33,195 cubic 
yards from shoals in Gallants Channel at a cost of $38,592. 
Condition and operation studies cost $24,918. Contributed 
funds of $116,142 were expended on dikes for pipeline 
dredging. 
Condition at end of fiscal year. The project was completed 
in October 1965 except for the Morgan Creek 
modification which was completed November 12, 1983. 
(For further details see Annual Report for 1962.) Costs 
under existing project to September 30, 1987, were 
$827,040 for new work, including $34,000 contributed 
funds and $3,615,035 for maintenance, including $284,975 
contributed funds, a total of $4,442,075. 
4. BELHAVEN HARBOR, N. C. 
Location. The town of Belhaven is at the junction of 
Pantego Creek and Pungo River, about 11 miles above the 
mouth of the latter. The harbor consists of the lower 
6-4

WILMINGTON, N. C., DISTRICT 
reaches of Pantego Creek and is about 6,000 feet long. 
Pungo River forms part of the Intracoastal Waterway between 
Norfolk and the St. Johns River. Norfolk is 130 miles 
north of Belhaven and Beaufort 66 miles south. (See U. S. 
Coast and Geodetic Survey Chart No. 123.) 
Existing project. This provides for a channel 12 feet 
deep at mean low water and 100 feet wide, extending from 
deep water in Pungo River to a point about 800 feet east of 
the highway bridge, with a turning basin 800 feet long and 
300 feet wide at the upper end; and for the construction of 
timber breakwaters at the mouth of Pantego Creek. Pungo 
River is a nontidal stream with little slope. Variations in 
the water surface, due to winds, seldom exceed 2 feet 
above or below mean stage. The project was authorized by 
River and Harbor Acts of July 3, 1930 and June 20, 1938. 
Local cooperation. Fully complied with. 
Terminal facilities. There are 12 wharves along the 
town waterfront, all of timber construction; one is owned 
by the town and is open to all without charge; four have 
rail connections. The facilities are considered adequate for 
existing commerce. 
Operations and results during fiscal year. Maintenance: 
Repair of timber breakwaters cost $63,200. 
Condition at end of fiscal year. The project was completed 
in September 1940. 
5. CAPE FEAR RIVER, N. C. 
ABOVE WILMINGTON 
Location. The river is formed by confluence of the Deep 
and Haw Rivers at Moncure, Chatham County, N. C., and 
empties into the Atlantic Ocean at Cape Fear, near the 
southern extremity of the State. (See Coast and Geodetic 
Survey Chart 426.) 
Previous projects. For details see Annual Reports for 
1915 and 1938. 
Existing project. The authorized project provides for a 
channel 25 feet deep and 200 feet wide from Wilmington to 
a turning basin 400 feet wide and 550 feet long at Navassa 
(2.9 miles); a channel 12 feet deep and 140 feet wide from 
Navassa to mileboard 30 at Acme, with five channel 
cutoffs, 12 feet deep and 150 feet wide to eliminate sharp 
bends; a channel 8 feet deep from mileboard 30 to 
Fayetteville by constructing three locks and dams and by 
dredging river shoals; and recreational facilities at the 
locks and dams. Total length of the project channels is 
113.9 miles. The project was authorized by River and 
Harbor Acts of June 25, 1910; June 26, 1934; August 30, 
1935; August 26, 1937; October 27, 1965; and Section 4, 
Flood Control Act of 1944. For further details see Annual 
Reports for 1962 and 1970. 
Local cooperation. Fully complied with. 
Terminal facilities. There are twelve waterfront 
facilities on the river, with a total frontage of 1,190 feet. 
Operations and results during fiscal year. Maintenance: 
During intermittent periods the U. S. debris boat Snell 
snagged and cleared and maintained the buoy systems at 
the locks at a cost of $310,089. Between October 23, 1986 
and February 10, 1987, the contract dredge Buxton 
removed 79,492 cubic yards from shoals in the river 
channel at a cost of $273,227. Design for future years 
pipeline dredging cost $19,489. Design of portages at the 
locks cost $2,566. Repair and installation of dikes at lock 
and dam no. 1 cost $169,380. Perimeter security fences at 
lock and dam nos. 1 and 2 cost $19,336. Periodic inspection 
of locks and dams cost $10,328. Condition and operation 
studies cost $73,917. Operation and maintenance of three 
locks and dams cost $233,388. 
Condition at end of fiscal year. The project was 
completed in June 1970. Total costs of existing project to 
September 30, 1987, were $17,316,918 of which $3,610,454 
(including $1,226,385 public works) was for new work and 
$13,706,464 for maintenance. 
6. CHANNEL FROM BACK SOUND TO LOOKOUT 
BIGHT, N. C. 
Location. The project is located on the coast of North 
Carolina, 8 miles east of Beaufort Inlet. (See Coast and 
Geodetic Survey Chart 420.) 
Existing project. The authorized project provides for a 
channel 100 feet wide and 7 feet deep from Back Sound, 
through Shackleford Banks to Lookout Bight. The project 
was authorized by River and Harbor Acts of August 26, 
1937, and March 2, 1945. For details see Annual Report for 
1959. 
Local cooperation. Fully complied with. 
Terminal facilities. Not required. 
Operations and results during fiscal year. Maintenance: 
The dredge Currituck incurred cost of $626. The debris 
boat Snell incurred cost of $1,446. Disposal ara stabilization 
at Bardens Inlet cost $46,075. Condition and operation 
studies cost $14,566. 
Condition at end of fiscal year. The project was completed 
in May 1965. 
7. FAR CREEK, N.C. 
Location. Flows easterly from Englehard into Pamlico 
Sound, about 95 miles south of Norfolk, Va. (See Coast and 
Geodetic Survey Chart 1232). 
Existing project. A channel 12 feet deep and 80 to 100 
feet wide from Pamlico Sound to highway bridge at 
Englehard, with a turning basin 12 feet deep, 200 feet wide 
and 900 feet long at the head. Project was authorized by 
River and Harbor Acts of July 3, 1930, and May 17, 1950. 
For further details see Annual Report for 1962. 
Local cooperation. Fully compiled with. 
Terminal facilities. Project is served by 12 waterfront 
facilities with a total frontage of 2,300 feet, all privately 
owned. Existing facilities are adequate for present commerce. 
Operations and results during fiscal year. Maintenance: 
Condition and operation studies cost $100. 
Condition at end of fiscal year. Project completed June 
1957. 
6-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
8. LOCKWOODS FOLLY RIVER, N. C. 
Location. The project is located on the south coast of 
North Carolina about 12 miles west of Cape Fear River. 
(See Coast and Geodetic Survey Chart 1236 and Geological 
Survey Map of North Carolina.) 
Existing project. The authorized project provides for a 
channel 100 feet wide and 6 feet deep at low water from 
the ocean to the bridge at Supply 12.5 miles above, to be 
obtained by dredging through oyster rocks and mudflats. 
The completed river portion of the project above the 
waterway was reclassified to the active category in 1971. 
Lunar tidal ranges in Lockwoods Folly River are 4.5 feet 
at the inlet and 2 feet at the head of navigation at Supply. 
The existing project was authorized by the 1890 River and 
Harbor Act. (See Annual Report for 1887, page 1099.) A 
modification to enlarge the channel from 6 to 12 feet deep 
and from 100 to 150 feet wide across the ocean bar for a 
distance of 4,700 feet was approved by the Chief of 
Engineers on June 3, 1980, under Section 107 of the 1960 
River and Harbor Act. During dredging operations it 
became apparent that establishment of the 12-foot project 
would not be possible with currently available equipment. 
Therefore, the Chief of Engineers, on December 20, 1983, 
approved the District's recommendation that further construction 
activity for the Lockwoods Folly Inlet project be 
suspended until suitable equipment becomes available and 
that the project be maintained at an 8-foot project depth in 
the interim. 
Local cooperation. For the new modification local 
interest must: (a) pay, contribute in kind, or repay with 
interest, one-half of the first costs of construction allocated 
to recreational boating ; (b) hold and save the United 
States free from damages resulting from changes in 
groundwater levels, saltwater intrusion, or wave action 
due to the construction works, except damages due to the 
fault or negligence of the United States or its contractor; 
(c) provide without cost to the United States all lands, 
easements, and rights-of-way necessary for the 
construction and subsequent maintenance of the project 
and for aids to navigation upon the request of the Chief of 
Engineers and, (d) provide depths in berthing areas 
commensurate with the project depths, and provide 
service facilities. 
Terminal facilities. Thirty-one piers and wharves on the 
Atlantic Intracoastal Waterway at Holden Beach, about 
1.25 miles west of Lockwoods Folly Inlet, with a total 
frontage of about 1,980 feet available. At Dixons Landing, 
about 2 miles upstream of the inlet, there are five wharves 
with a total frontage of 240 feet. Numerous natural 
landings are used for loading and unloading small boats. 
Berthing space in the vicinity of Lockwoods Folly Inlet 
totals about 2,220 feet. Facilities are considered adequate 
for present commerce. 
Operations and results during fiscal year. Maintenance: 
During intermittent periods the U. S. hopper dredge 
Currituck removed 51,613 cubic yards from shoals in 
Lockwoods Folly Inlet at a cost of $80,889. During 
intermittent periods the U. S. sidecasting dredge Fry 
removed 67,710 cubic yards from shoals in Lockwoods 
Folly Inlet at a cost of $161,514. General archeological 
investigations cost $1,334. Archeological investigations of 
the blockade runner Bendigo cost $5,101. Condition and 
operation studies cost $31,856. 
Condition at end of fiscal year. The active portion of the 
project was completed in June 1965 except for the latest 
modification. Work was initiated on the latest modification 
on September 23, 1982, with a depth of 8 feet being 
reached in October 1982. The project will be maintained at 
the 8-foot depth until suitable equipment for deepening to 
12 feet becomes available. 
9. MANTEO (SHALLOWBAG) BAY, N. C. 
Location. The project is located on the northeastern side 
of Roanoke Island, North Carolina. (See Coast and 
Geodetic Survey Chart 1229.) 
Existing project. The authorized project provides for a 
channel 14 feet deep and 400 feet wide from the Atlantic 
Ocean through Oregon Inlet with connecting 12-foot channels, 
100 feet wide, to Pamlico Sound, Manteo, and Wanchese; 
and a channel 6 feet deep and 100 feet wide connecting 
the Manteo-Oregon Inlet Channel with Albemarle 
Sound. Length of channels is 25.4 miles. A newly authorized 
modification provides for stabilization of Oregon Inlet 
with a dual rubble-mound jetty system, including means 
for sand transfer to the downdrift beach; a channel, 20 feet 
deep and 400 feet wide, through the ocean bar at Oregon 
Inlet; a channel, 14 feet deep and 120 feet wide, from the 
gorge in Oregon Inlet to and through Roanoke Sound to 
and including a 15-acre basin of the same depth at Wanchese; 
and a channel 10 feet deep and 100 feet wide from 
the 12 foot deep channel in Manteo (Shallowbag) Bay 
through Roanoke and Albemarle Sounds to deepwater 
near the northern end of Croatan Sound. The 12 foot 
Croatan Sound channel has been deferred due to lack of 
economic justification. The estimated Federal cost for the 
modification is $80,000,000 (1987). The project was 
authorized by River and Harbor Acts of June 25, 1910; October 
17, 1940; May 17, 1950; and December 31, 1970; and 
under Section 107 of the 1960 River and Harbor Act. 
Local cooperation. For the new modification, local interests 
must: (a) provide all lands, easements, and rightsof-
way for construction and subsequent maintenance of the 
project, including suitable areas required for initial and 
subsequent disposal of spoil and also necessary retaining 
dikes, bulkheads, and embankments therefor, or the cost 
of such retaining works; (b) hold and save the United 
States free from damages due to the construction works 
and subsequent maintenance; (c) continue to provide and 
maintain adequate terminal and transfer facilities, open to 
all on equal terms, in accordance with plans approved by 
the Chief of Engineers; (d) provide and maintain necessary 
mooring and berthing facilities in any enlarged basin, open 
to all on equal terms, in accordance with plans approved by 
the Chief of Engineers; (e) provide and maintain depths in 
berthing areas and local access channels serving the terminals 
commensurate with depths provided in the related 
project areas; (f) accomplish such alterations as required in 
sewer, water supply, drainage, electrical powerlines, 
6-6

WILMINGTON, N. C., DISTRICT 
telephone lines, or other utility facilities as well as their 
maintenance; (g) establish a competent and properly constituted 
public body empowered to regulate the use, 
growth, and free development of the harbor facilities, with 
the understanding that said facilities will be open to all on 
equal terms; (h) and establish regulations prohibiting the 
discharge of untreated sewage, garbage, and other 
pollutants in the water of the harbor by the users thereof, 
which regulations shall be in accordance with applicable 
laws or regulations of Federal, State, and local authorities 
responsible for pollution prevention and control; (i) pay 
one-half of the separable and joint costs allocated to 
recreational navigation presently estimated at 
$11,800,000, and bear all costs of operation, maintenance 
and replacement of recreational navigation facilities 
presently estimated at $1,230,000 annually; (j) pay 10 percent 
of the costs allocated to navigation during construction 
presently estimated at $7,600,000; (k) pay an additional 
10 percent of the costs allocated to navigation within a 
period of 30 years following completion of construction offset 
by a credit allowed for the value of lands, easements, 
rights-of-way, relocations (except utility relocations), and 
dredged material disposal areas presently estimated at 
$6,800,000. Reasonable assurances have been received. 
The State of N. C. has constructed the Wanchese Harbor 
portion and was reimbursed under Sec. 215, PL 90483. 
Terminal facilities. The project is served by 33 waterfront 
facilities with a total frontage of 3,320 feet. Additional 
wharves and facilities will be provided with the 
enlarged basin at Wanchese. 
Operations and results during fiscal year. New work: 
Engineering and design for the modification cost $158,185. 
Maintenance: During intermittent periods the U.S. 
sidecasting dredge Schweizer removed 340,253 cubic 
yards from shoals in Oregon Inlet and west of the bridge at 
a cost of $1,111,725. During intermittent periods the U.S. 
sidecasting dredge Merritt removed 19,960 cubic yards 
from shoals in Oregon Inlet at a cost of $39,584. During intermittent 
periods the U.S. sidecasting dredge Fry removed 
84,743 cubic yards from shoals in Oregon Inlet at a cost 
of $313,577. During intermittent periods the U. S. hopper 
dredge Currituck removed 41,400 cubic yards from shoals 
in Oregon Inlet at a cost of $127,189. During intermittent 
periods the U. S. debris boat Snell repaired dredging 
ranges and mooring facilities at a cost of $69,144.Between 
January 20 and April 20,1987, the contract dredge Clinton 
removed 272,689 cubic yards from shoals in Old House 
Channel at a cost of $594,938. Between April 9 and May 22, 
1987, the contract dredge Enterprise removed 249,093 
cubic yards from shoals in Old House Channel and west of 
the bridge at a cost of $586,994. Between March 11 and 
June 2, 1987, the contract dredge A tchafalaya and 
Mermentau removed 365,906 cubic yards from shoals in 
Oregon Inlet at a cost of $679,094. Between June 5 and July 
22, 1987, the contract dredge Nermentau removed 
533,183 cubic yards from shoals in Oregon Inlet at a cost of 
$814,874. Cost in connection with prior years dredging was 
$34,777. Expansion of disposal islands cost $25,011. Project 
monitoring cost $50,268. Condition and operation studies 
cost $158,422. Contributed funds of $156,000 were expended 
for diking for pipeline dredging. 
Condition at end of fiscal year. The project is complete 
except for the latest modification. (For further details, see 
Annual Report of 1962.) 
10. MOREHEAD CITY HARBOR, N. C. 
Location. The project is located on the northern shore of 
Bogue Sound, adjacent to Beaufort Inlet. (See Coast and 
Geodetic Survey Chart 420.) 
Previous project. For details see page 470 of Annual 
Report for 1935. 
Existing project. The authorized project provides for 
deepening of the channel, from the 42-foot-depth contour in 
the Atlantic Ocean through the ocean bar to the gorge in 
Beaufort Inlet, to 42 feet over a bottom width of 450 feet, 
thence to a depth of 40 feet in the east leg of the turning 
basin including the 1,200-foot diameter turning area, with 
widths of 600 feet in the cutoff channel, and 400 feet wide 
to the turning basin and connecting shallow-draft channels. 
Project deepening was completed on August 2, 1978. Jetties 
at Beaufort Inlet were reclassified to the "active" 
category on March 8, 1972. The jetties were deauthorized 
by the Water Resources Development Act of 1986. In 
general the project as it now exists was authorized by the 
1958 River and Harbor Act (S.D. 54, 84th Cong., 1st sess.) 
and the River and Harbor Act of December 31, 1970. For 
further details see Annual Report for 1962. 
Local cooperation. Fully complied with. 
Terminal facilities. Twenty-six waterfront facilities 
serve the port, with a total frontage of 1,250 feet. Marine 
terminals provide 5,300 feet of berthing space, with a 
depth alongside of 35 feet, and facilities for transfer of 
cargoes between rail and water carriers. Improvements to 
facilities were completed in 1969. For further details see 
Port Series No. 12, revised 1987, Corps of Engineers. 
Operations and results during fiscal year. Maintenance: 
Between December 9, 1986 and March 23, 1987, the contract 
dredge Enterprise removed 351,588 cubic yards from 
shoals in the basin and channels at a Federal cost of 
$508,728. Between April 7 and May 6, 1987, the contract 
dredge Sugar Island removed 534,555 cubic yards from 
shoals in the ocean bar at a cost of $922,921. Cost adjustments 
for prior year dredging caused a decrease of 
$6,140. Ocean dumping monitoring cost $2,349. Monitoring 
at Morehead City Harbor cost $23,353. Condition and 
operation studies cost $144,592. Contributed funds of 
$47,455 were expended for diking for pipeline dredging. 
Contributed funds of $252,215 were expended for State 
Ports dredging. 
Condition at end of fiscal year. The existing project is 
complete except for the jetties. (For further details, see 
Annual Report for 1962.) Total cost of the existing project 
to September 30, 1987, was $49,289,990 of which $6,501,569 
was for new work (including $553,477 public works funds) 
and $42,788,421 for maintenance, including $1,173,924contributed 
funds. 
6-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
11. OCRACOKE INLET, N. C. 
Location. The inlet connects Pamlico Sound with the 
Atlantic Ocean, about 30 miles southwest of Cape Hatteras 
and 43 miles northeast of Cape Lookout. (See U.S. Coast 
and Geodetic Survey Chart No. 1232.) 
Existing project. The authorized project provides for a 
channel across the ocean bar 18 feet deep and 400 feet 
wide. Construction of a jetty extending from Ocracoke 
Island to the Atlantic Ocean was deauthorized by the 
Water Resources Development Act of 1986. The project 
was authorized by the River and Harbor Act of July 14, 
1960. For further details, see Annual Report for 1962. 
Local cooperation. Fully complied with. 
Terminal facilities. None required. 
Operations and results during fiscal year. Maintenance: 
The Schweizer incurred cost of $794. Condition and operation 
studies cost $10,703. 
Condition at end of fiscal year. Construction was completed 
in August 1971. 
12. SHALLOTTE RIVER, N. C. 
Location. A small stream in Brunswick County, N. C., 
rising in the large swamp country between Cape Fear and 
Waccamaw Rivers, known as Green Swamp. Stream is 
about 30 miles long and flows southerly into Atlantic 
Ocean and 20 miles west of mouth of Cape Fear River. (See 
Coast and Geodetic Survey Chart 835.) 
Previous project. For details see page 1806 of Annual 
Report for 1915. 
Existing project. A channel 4 feet deep at mean low 
water and 36 feet wide from the mouth to town of 
Shallotte. Section under improvement is 9 miles long. 
River is tidal, range varying from 5 feet at mouth to 3 feet 
at Shallotte. Hurricane Hazel in 1954 caused a tide about 
16 feet above mean sea level in the river at Shallotte Point. 
Project authorized by River and Harbor Acts of March 4, 
1913, and January 21, 1927. 
Local cooperation. None required. 
Terminal facilities. A marine railway and shop at 
Shallotte Point and another in town of Shallotte with 
facilities for building and repairing boats up to about 60 
feet long. On Shallotte River, there are 17 docks varying 
from 16 to 321 feet of frontage, providing 1,334 feet of 
wharf and docking space. 
Operations and results during fiscal year. Maintenance: 
Costs in connection with FY88 pipeline dredging was 
$2,440. Project condition surveys cost $19. 
Condition at end of fiscal year. Project completed in 
1929. 
13. SILVER LAKE HARBOR, N. C. 
Location. The project is located at the southwest end of 
Ocracoke Island, a portion of the Outer Banks on the 
southeast coast of North Carolina, separating Pamlico 
Sound from the Atlantic Ocean. (See Coast and Geodetic 
Survey Chart No. 1232.) 
Existing project. The authorized project provides for 
basin depths of 12 feet in Silver Lake Harbor; an entrance 
channel 12 feet deep and 60 feet wide, from the basin to 
Teaches Hole Channel; a channel, 12 feet deep and 150 feet 
wide, from the entrance channel through Big Foot Slough 
Bar to the 12-foot contour in Pamlico Sound; a channel, 12 
feet deep and 150 feet wide, from the entrance channel 
through Teaches Hole Channel to the gorge in Ocracoke 
Inlet; a channel, 12 feet deep and 150 feet wide, across 
Bluff Shoal; and for rubble-mound training walls on the 
north and south sides of the entrance channel, 300 feet and 
400 feet long, respectively. Mean tidal ranges are 1.9 feet 
in the throat of Ocracoke Inlet and 1 foot at Ocracoke. 
Variations in the water surface of Pamlico Sound are 
generally due to winds and seldom exceed 1 or 2 feet above 
or below mean stage. Severe storms have raised the water 
surface as much as 7 feet above normal water level at 
Ocracoke. (See Table 6-B for Authorizing Legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Twelve waterfront facilities serve 
the harbor. These facilities are adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
During intermittent periods the U. S. sidecasting dredge 
Schweizer removed 59,148 cubic yards from shoals in 
Teaches Hole channel at a cost of $139,994. During intermittent 
periods the U. S. sidecasting dredge Merritt 
removed 23,819 cubic yards from shoals in Teaches Hole 
channel at a cost of $43,400. Between October 13 and 
November 22, 1986, the contract dredge Hampton Roads 
removed 233,281 cubic yards from shoals in Big Foot 
Slough and Teaches Hole channels at a cost of $672,834. 
Condition and operation studies cost $18,772. 
Condition at end of fiscal year. The project was completed 
July 28, 1970. (For further details see Annual 
Report for 1961.) 
14. WATERWAY CONNECTING PAMLICO SOUND 
AND BEAUFORT HARBOR, N. C. 
Location. The project is located in Core Sound, west of 
the outer banks of eastern North Carolina. (See Coast and 
Geodetic Survey Charts Nos. 420 and 1233.) 
Existing project. The authorized project provides for a 
through channel to Core Sound 7 feet deep and 75 feet 
wide from Pamlico Sound to Beaufort Harbor; an alternative 
route of the same dimensions through Back Sound 
by way of channels at the east and west ends of Harkers 
Island; a channel 7 feet deep and 70 feet wide from the 
through channel to the local harbor at Cedar Island, including 
the authorized passage and future maintenance of 
a channel through the existing private basin, and an access 
channel 6 feet deep, 50 feet wide and about 400 feet long to 
a basin the same depth, 60 feet by 100 feet; a channel 7 feet 
deep and 75 feet wide from the through channel to Atlantic; 
a channel 7 feet deep and 75 feet wide, with a basin 200 
feet by 500 feet, the same depth, at Sealevel; a channel 5 
feet deep and 75 feet wide, with basin 150 feet by 130 feet, 
6-8

WILMINGTON, N. C., DISTRICT 
the same depth, at Davis; a channel 6 feet deep and 60 feet 
wide with a basin 100 feet by 600 feet, the same depth, at 
Marshallberg; an entrance channel 6 feet deep and 60 feet 
wide, from Back Sound to harbor of refuge 120 feet by 250 
feet, the same depth in Brooks Creek at the west end of 
Harkers Island; and a channel 7 feet deep and 70 feet wide, 
from the existing side channel at Atlantic, N.C., to the 
mouth of Little Port Brook; thence 7 feet deep and 50 feet 
wide, along the Brook to a basin 600 feet long, 180 feet 
wide, and 7 feet deep, with a breakwater, beginning at a 
point between the mouth of Little Port Brook and White 
Point, running along the channel approximately 2,000 feet. 
Plane of reference is mean low water. The length of the 
authorized channels is about 50.6 miles. (See Table 6-B for 
authorizing legislation.) 
Local cooperation. Fully complied with to date for completed 
portion. 
Terminal facilities. Sixteen small wharves serve the 
waterway. Additional facilities are needed along Core 
Sound. 
Operations and results during fiscal year. Maintenance: 
Condition and operation studies cost $9,600. Project condition 
surveys cost $12,278. 
Condition at end of fiscal year. The project was completed 
in September 1972. (For further details, see Annual 
Report for 1961.) 
15. WILMINGTON HARBOR, N. C. 
Location. The project is located on the Cape Fear River, 
on southeast coast of North Carolina, between the Atlantic 
Ocean and Wilmington, North Carolina. (See Coast and 
Geodetic Survey Chart No. 426.) 
Previous projects. For details, see page 1804 of Annual 
Report for 1915 and page 533 of Annual Report for 1938. 
Existing project. The authorized project provides for a 
channel 40 feet deep and 500 feet wide from the Atlantic 
Ocean through the ocean bar and entrance channels to 
Southport, thence 38 feet deep and 400 feet wide to the 
upper end of the anchorage basin (foot of Castle Street) at 
Wilmington, thence 32 feet deep and 400 feet wide, to 
Hilton Bridge over Northeast (Cape Fear) River; a 38-footdeep 
anchorage basin at Wilmington; a 32-foot-deep 
turning basin opposite the principal terminals; a channel 
12 feet deep and 100 feet wide, about 3 miles long, in Cape 
Fear River; and a channel 25 feet deep and 200 feet wide 
from Hilton Bridge over Northeast (Cape Fear) River to a 
point 1.66 miles above, including a turning basin of the 
same depth, 700 feet wide and 500 feet long, at a point 1.25 
miles above the bridge. The project was authorized by 
River and Harbor Acts of July 3, 1930; March 2, 1945; May 
17, 1950; October 23, 1962; and March 10, 1964; under 
Section 107 of the 1960 River and Harbor Act. A modification 
to widen the existing anchorage basin by 100 feet 
was authorized on July 13, 1982, under Sec. 5 of the Cong. 
Appro. Act of March 4, 1915. A modification to widen the 
38-foot by 400-foot Fourth East Jetty Chanel to 500 feet; 
deepen the 32-foot by 400-foot channel between Castle 
Street and the N. C. 133 bridge to 35 feet; deepen and 
widen the 32-foot by 1000-foot by 800-foot turning basin 
just above the mouth of the Northeast (Cape Fear) River 
to 35 feet by 1,000 feet by 900 feet; and environmental 
improvements to include acquiring, by easements or fee 
title, about 1,800 acres of wetlands, river bluffs and 
ecotones and provision for a minimum number of specially 
designed corridors across the wetlands for industrial 
access to the river was authorized by the Water Resources 
Development Act of November 17, 1986 (PL 99-662). The 
estimated Federal cost is $7,700,000. (For further details of 
authorization, see 1962 Annual Report.) 
Local cooperation. Fully complied with to date except 
for latest modification. In accordance with the cost sharing 
and financing concepts reflected in the Water Resources 
Development Act of 1986, the non-Federal sponsor must (1) 
provide all lands, easements, rights-of-way, and dredged 
material disposal areas including necessary retaining 
dikes presently estimated at $418,000, and bear all 
operation and maintenance costs for dikes presently 
estimated at $4,000 annually; (2) pay 25 percent of the first 
costs allocated to fish and wildlife enhancement presently 
estimated at $1,200,000, and pay 25 percent of the costs of 
operation, maintenance, and replacement of fish and 
wildlife facilities presently estimated at $14,000 annually; 
(3) and pay 35 percent of the costs allocated to deep draft 
navigation during construction (partially offset by a credit 
for lands, easements, rights-of-way, relocations, and 
dredged material disposal areas), presently estimated at 
$1,500,000. 
Terminal facilities. Forty-three principal wharves, piers, 
and docks at port of Wilmington, with a berthing space of 
about 20,000 linear feet serve the harbor. These facilities 
handle general cargo and petroleum products. For further 
details, see Port Series No. 12, revised 1987, Corps of 
Engineers. 
Operations and results during fiscal year. Maintenance: 
Cost adjustments on the debris boat Snell resulted in 
reduction in cost of $1,950. Between January 2 and February 
4, 1987, the U. S. hopper dredge McFarland removed 
662,862 cubic yards from shoals in the ocean bar at a cost of 
$1,332,850. Between January 14 and April 15, 1987 the contract 
dredge Hampton Roads removed 1,097,060 cubic 
yards from shoals in the anchorage basin at a Federal cost 
of $657,581. Design for fiscal year 1988 bucket and barge 
dredging cost $46,233. Environmental analysis of proposed 
dredged material disposal sites cost $81,154. Ocean dumping 
monitoring cost $1,227. Condition and operation 
studies cost $240,021. Contributed funds of $55,107 were 
expended for State Ports dredging. Contributed funds of 
$31,555 were expended for design of Eagle Island dikes. 
Condition at end of fiscal year. The active portion of the 
project was completed October 1982 except for latest 
modification. (For further details, see Annual Report for 
1962.) Total cost of the existing project to September 30, 
1987, was $70,657,429 of which $14,089,612 was for new 
work and $56,567,817 was for maintenance, including 
$3,605,467 contributed funds. 
6-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Flood Control 
16. ARARAT RIVER, MOUNT AIRY, N. C. 
Location. Ararat River is a tributary of the Yadkin 
River and is located in Surry County, N. C. The river flows 
through Mount Airy, N. C., to its confluence with the 
Yadkin River. The entire project borders Mt. Airy. (See 
USGS quadrangle sheets, Mount Airy, North, Va. and 
N. C. and Mount Airy, South, N. C.) 
Existing project. The project consists of approximately 
5,100 feet of industrial area dike construction, approximately 
6,700 feet of channel improvement, approximately 
1,800 feet of floodwall/dike at the Pine Street commercial 
area, and a flood warning system. The project was approved 
by the Chief of Engineers on August 10, 1983, under 
Section 205, 1948 Flood Control Act, as amended. The 
estimated Federal construction cost is $4,000,000 (1986). 
Local cooperation. Local interest must: (a) provide 
without cost to the United States all lands, easements, and 
rights-of-way, including suitable borrow and spoil disposal 
areas and suitable conservation lands to partially compensate 
for loss of fish and wildlife resources as determined by 
the Chief of Engineers, necessary for the construction of 
the project; (b) accomplish without cost to the United 
States all alterations and relocations of buildings, 
transportation facilities, storm drains, utilities, and other 
structures and improvements made necessary by the construction; 
(c) hold and save the United States free from 
damages due to the construction works, except damage 
due to the fault or negligence of the United States or its 
contractors; (d) maintain and operate the project after 
completion in accordance with regulations prescribed by 
the Secretary of the Army; (e) prescribe and enforce 
regulations to prevent obstruction or encroachment on 
channels and interior ponding areas which would reduce 
their flood-carrying capacity or hinder maintenance and 
operation, and control development in the project area to 
prevent an undue increase in the flood damage potential; 
and (f) assume full responsibility for all project costs in excess 
of the Federal cost limitation of $4 million. Formal 
assurances have been received. 
Operations and results during fiscal year. New work: 
Project construction was completed at a Federal cost of 
$308,711. Contributed funds of $878,385 were expended for 
construction. 
Condition at end of fiscal year. The project was completed 
April 30, 1987, and was turned over to the local 
sponsor for operation and maintenance on January 29, 
1987. 
17. CAPE FEAR RIVER BASIN, N. C. 
Location. Work covered by this project consists of a 
series of dams and reservoirs on tributaries of the Cape 
Fear River in North Carolina within a radius of 100 miles 
from Raleigh, North Carolina. (See Geological Survey Map 
of North Carolina.) 
Existing project. Public Law 88-253, approved 
December 30, 1963, authorized three principal dams and 
reservoirs and a series of smaller reservoirs on tributaries 
of the Cape Fear River in accordance with the comprehensive 
plans in House Document 508, 87th Congress, 2d 
session. The act also provides that the appropriate 
agencies of the Departments of the Army and Agriculture 
shall conduct joint investigations and surveys and prepare 
a report on the upper tributaries of the Cape Fear River in 
the interest of watershed protection and flood prevention, 
and the conservation, development, utilization, and 
disposal of water. The report was prepared in compliance 
with provisions of Public Law 87-639. The study was 
unfavorable and has been submitted to Congress. No 
further action will be taken. A list of the dams and 
reservoirs included in the comprehensive plan follows. 
(See Table 6-J on Dams and Reservoirs). Estimates of cost 
as given are based on 1960 price levels, except the ones for 
B. Everett Jordan Dam and Lake, and Randleman Lake, 
which were revised in 1987, and Howards Mill Lake in 
1980. These three projects have been authorized for 
construction in accordance with the above authorization. 
Howards Mill Lake was reclassified to the "deferred" 
category in October 1980 due to the current lack of 
economic justification. 
Local cooperation. Requirements are given in the 
individual project reports. 
17A. B. EVERETT JORDAN DAM AND LAKE, N. C. 
Location. The project is located on the Haw River, N. C., 
4.3 miles above its mouth, and 2.5 miles north of Moncure, 
N.C. 
Existing project. The project provides for an earth dam 
1,330 feet long with a maximum height of 112 feet above 
the streambed, an uncontrolled, unpaved chute spillway, 
and a controlled 19-foot diameter outlet structure. Some 
saddle dikes are required beyond the spillway. The 
reservoir has a gross storage capacity of 753,500 acre-feet, 
of which 538,400 acre-feet is for flood control and a 
conservation pool of 215,100 acre-feet for water-quality 
control, water supply, and sedimentation. The reservoir 
will be operated as a unit of a coordinated system for 
control of floods in the Cape Fear River Basin and for 
water supply, water-quality control, and other purposes. 
Estimated cost for new work is $138,330,000 (1987), 
consisting of $80,040,000 for construction, and $58,290,000 
for lands and damages, including highway, railroad, and 
utility relocations. The existing project was authorized by 
Public Law 88-253 approved December 30, 1963 (H.D. 508, 
87th Cong., 2d sess.) 
Local cooperation. Local interests must protect 
downstream channels from encroachments and obstructions 
which would adversely affect operation of the 
project; reimburse the Federal Government for all costs 
allocated to municipal and industrial water supply, 
presently estimated at $3,900,000 and bear all annual costs 
for operation, maintenance, and major replacements 
allocated to municipal and industrial water supply, an 
amount presently estimated at $40,000 annually; and 
contribute toward the cost of the ranger security 
buildings, an amount presently estimated at $330,000. 
6-10

WILMINGTON, N. C., DISTRICT 
Assurances that these obligations for water storage would 
be assumed have been received from the Department of 
Natural and Economic Resources, State of North Carolina. 
In addition, the State of N. C. has leased the project for 
public park, recreational, fish, wildlife, and other natural 
resource management purposes and the estimated cost to 
the State for O&M under this lease is $795,000 annually. 
Operations and results during fiscal year. New work: 
Construction of wildlife subimpoundments was continued 
at a cost of $1,746,330. Poplar Point recreation area was 
continued at a cost of $3,784,355. The Tailrace access area 
was continued at a cost of $339,107. The management 
center was completed at a cost of $106,687. The N. C. 
maintenance center and security building was initiated at 
a cost of $475,496. Ebenezer Church recreation area as 
initiated at a cost of $10,000. Crosswinds recreation area 
was initiated at a cost of $20,000. Seaforth recreation area 
was initiated at a cost of $484,813. Total Federal 
expenditures were $8,662,787 including the above items. 
Contributed funds of $20,000 were expended for the 
maintenance center security building. Status of plans and 
specs: Poplar Point, Parkers Creek and Crosswinds 
security buildings, 100 percent; and rehabilitate Mason 
House, 100 percent. Maintenance: Water quality studies 
were conducted at a cost of $26,385. Periodic inspections 
cost $19,903. Automatic gate control system cost $4,627. 
Sedimentation surveys cost $3,266. Normal operation and 
maintenance cost $772,849. Maintenance and operation of 
dams cost $66,678. 
Condition at end of fiscal year. All facilities are bascially 
complete except for Public Service Gasline, recreation 
facilities, and project operations facilities. Impoundment 
was completed in February 1982 with dedication on May 1, 
1982. Project completion is scheduled for September 1989.' 
17B. RANDLEMAN LAKE, N. C. 
Location. The project is located on Deep River, N. C., 
about 15 miles south of Greensboro and about 2 miles 
upstream from the town of Randleman. The damsite and 
about two-thirds of the reservoir would lie in Randolph 
County. The upper one-third of the reservoir would lie in 
Guilford County. 
Existing project. The authorized project provides for 
construction of an earth dam 2,300 feet long with a maximum 
height of 110 feet above the streambed to create a 
reservoir with gross storage of 108,000 acre-feet, consisting 
of 46,000 acre-feet for flood control and a conservation 
pool of 62,000 acre-feet for water supply, water-quality 
control and sedimentation. Randleman Lake is the second 
project of the comprehensive plan of development for the 
Cape Fear River Basin, providing reservoir storage for 
flood control, water supply, and recreation. Estimated 
cost of new work is $111,000,000 (1987), consisting of 
$54,362,600 for construction and $56,638,000 for lands and 
damages, including relocations. The existing project was 
authorized by the 1968 Flood Control Act (H.D. 343, 90th 
Cong., 2d sess.). 
Local cooperation. Based on the termination of Federal 
interest in the project by the ASA(CW), no local cooperation 
is required. 
Operations and results during fiscal year. New work: 
Advance engineering and design cost $26,402. The State of 
N. C. was reimbursed $387,064 and AT&T has been reimbursed 
$39,397 for costs incurred under an advance participation 
agreement. Project coordination and completion 
of design effort prior to termination cost $46,018. 
Condition at end of fiscal year. Preconstruction planning 
was completed in FY 1982. The Piedmont Triad Regional 
Water Authority plans to build a water supply and possible 
recreation facility at Randleman. All pertinent data 
that may be useful in the construction has been provided. 
18. CAROLINA BEACH AND VICINITY, N. C. 
Location. The project is in New Hanover County, about 
15 miles southeast of Wilmington, N. C., on the peninsula 
which separates lower Cape Fear River from the Atlantic 
Ocean. (See Coast and Geodetic Survey Map 834.) 
Existing project. The authorized project provides for 
construction of a dune with a base generally bordering at 
or near the building line, with a crown width of 25 feet at 
an elevation of 15 feet above mean low water, together 
with integral construction of a beach berm with a crown 
width of 50 feet at elevation 12, extending about 31,800 
feet from the northern limits of Carolina Beach to the 
southern limits of Kure Beach; initial deposition of sufficient 
material north of Carolina Beach to serve as a feeder 
beach; and Federal participation in the cost of beach 
nourishment for a period not to exceed 10 years from the 
year of completion of initial placement. Along the northern 
2,050 feet, the project includes a rock revetment at elevation 
12 fronted by a 130-foot-wide berm at elevation 8. The 
area south of Carolina Beach was reclassified to the active 
category, June 1985. Approved estimated Federal cost for 
new work is $15,200,000 (1987). The project was authorized 
by the 1962 Flood Control Act (H.D. 418, 87th Cong. 2d 
sess.). 
Local cooperation. Local interests must: (a) Provide 
lands, easements, and rights-of-way for construction; 
(b) make required relocations and alterations of streets, 
utilities, or structures; (c) contribute 37.9 percent of the 
total first cost, with credit allowed for (a) and (b); 
(d) hold the United States free from damages; (e) maintain 
all works after completion; (f) maintain continued public 
ownership of the shore; (g) adopt and enforce appropriate 
ordinances to provide for preservation of improvement 
and its protective vegetation; (h) control water pollution to 
extent necessary to safeguard health of bathers; and 
(i) at least annually inform interests affected that project 
will not provide any substantial protection from ocean 
surges higher in elevation than that of Hurricane Hazel, 
October 15, 1954. Requirements have been fulfilled to date 
for the town of Carolina Beach portion of the project only. 
Operations and results during fiscal year. New work: 
Design for the second increment of renourishment cost 
$17,840. 
Condition at end of fiscal year. Project construction was 
completed August 12, 1982, except for grassing which was 
6-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
completed in September 1983. The first increment of 
renourishment was completed in June 1985. A contract for 
the second increment is scheduled for award in January 
1988. 
19. NEUSE RIVER BASIN, N. C. 
Location. Works covered by this project consist of a 
series of dams and reservoirs in the Neuse River Basin in 
North Carolina within a radius of 50 miles from Raleigh, 
North Carolina. (See Geological Survey Map of North 
Carolina.) 
Existing project. The Flood Control Act of 1965 
authorized construction of the Falls project as the key project 
in the recommended general plan of development of 
the Neuse River Basin. The plan will serve as a guide for 
immediate and future development of the basin's water 
resources as set forth in House Document 175, 89th Congress, 
1st Session. A list of projects included in the general 
plan of development follows. (See Table 6-J on Dams and 
Reservoirs.) Estimated costs as given are based on 1963 
price levels, except for Falls Lake which was revised in 
1987. 
19A. FALLS LAKE, N. C. 
Location. The project is on the Neuse River about 10 
miles north of the city of Raleigh, North Carolina. 
Existing project. The authorized project provides for an 
earth dam 1,915 feet long with a maximum height of 92 
feet above streambed. The dam has a 30-foot top width. An 
uncontrolled chute spillway, 100-feet wide, is located in the 
east abutment. The reservoir has a gross storage capacity 
of 335,620 acre-feet, of which 220,880 acre-feet is for flood 
control, 34,970 acre-feet for water supply for the city of 
Raleigh, 54,700 acre-feet for water-quality control, and 
25,070 acre-feet for sediment storage. The reservoir will be 
operated as the initial unit of a coordinated system for control 
of floods in the Neuse River Basin for water supply, 
water quality control, recreation, and other purposes. 
Estimated cost of new work is $165,000,000, (1987) consisting 
of $73,403,000 for construction and $91,597,000 for 
lands and damages, including highway, railroad, and utility 
relocations. The project was authorized by the 1965 Flood 
Control Act (H.D. 175, 89th Cong., 1st sess.) 
Local cooperation. Local interests must prevent encroachment 
on downstream channels that would interfere 
with the operation of the reservoir; pay the United States 
in accordance with the Water Supply Act of 1958, as 
amended, the entire amount of construction cost allocated 
to water supply, presently estimated at $12,400,000 and 
entire amount of operation, maintenance, and replacement 
costs allocated to water supply, presently estimated at 
$91,000 annually, the final amounts to be determined after 
actual costs are known; administer project land and water 
areas for recreation and fish and wildlife enhancement; 
pay, contribute in kind, or repay (which may be through 
user fees), with interest, one-half of the separable cost of 
the project allocated to recreation and one-fourth of the 
separable cost allocated to fish and wildlife enhancement, 
the amount involved currently being estimated at 
$18,600,000, and, bear all costs of operation, maintenance, 
and replacement of recreation and fish and wildlife lands 
and facilities, the amount involved currently being 
estimated at $1,261,000 on an average annual basis. Formal 
assurances have been received. The N. C. Department 
of Natural and Economic Resources has been authorized 
by an act of legislation to assure payment of all non- 
Federal costs allocable to water supply in all Federal projects 
as required by law. The State will require repayment 
of water supply costs, by the users. A contract between 
the city of Raleigh and the United States for water-supply 
storage space was approved by the Secretary of the Army 
on September 11, 1972. A contract agreement for cost 
sharing of recreational lands and facilities in accordance 
with P.L. 89-72 was approved by the Secretary of the Army 
on September 11, 1972. A contract agreement in accordance 
with Section 221 of P.L. 91-611 was executed on October 
10, 1972. 
Operations and results during fiscal year. New work: 
Real estate deficiency payments cost $1,395,376. Rolling 
View campground and recreation facilities were continued 
at a cost of $2,781,163. Sandling Beach miscellaneous 
features, were initiated at a cost of $58,111. Tailrace access 
area was initiated at a cost of $130,719. Total Federal expenditures 
were $5,969,059, including the above items. 
Status of plans and specs: Fish and wildlife subimpoundments, 
97 percent; Mangum House rehabilitation, 100 percent; 
and State maintenance center and security building, 
99 percent. Maintenance: Water quality studies were conducted 
at a cost of $173,737. Repairs to the dam cost 
$56,333. Borrow area repairs cost $210,046. Emergency 
lighting system cost $2,222. Periodic inspections cost 
$26,312. Normal operation and maintenance cost $796,108, 
for a total of $1,264,758. Maintenance and operation of 
dams cost $66,678. 
Condition at end of fiscal year. Reservoir filling was 
completed on December 7, 1983. Dedication ceremonies 
were held on April 30, 1983. Dam, access road, clearing, 
main operations area, all relocations and 46 percent of the 
recreation facilities are completed. Recreation facilities, 
fish and wildlife facilities and State management and O&M 
facilities are the major items remaining. 
20. SCUPPERNONG RIVER, N.C. 
Location. The stream rises in the east-central portion of 
Washington County, N. C., flows east into Tyrrell County, 
and thence north into Albemarle Sound, a total distance of 
about 22 miles. (See Geological Survey quadrangle sheet, 
Creswell, N. C.) 
Existing project. The project provides for excavating a 
70-foot-bottom-width channel, with depths ranging from 9 
feet to 12 feet, along Scuppernong River from Spruills 
Bridge to the confluence with Mauls Creek, a distance of 
2.0 miles, and excavating a 45-foot-bottom-width channel, 
with depths ranging from 6 feet to 8 feet, along Mauls 
Creek from Scuppernong River to County Road 1163, a 
distance of 1.8 miles. Total project length is 3.8 miles. 
Estimated Federal cost of construction is $509,000 (1984). 
6-12

WILMINGTON, N. C., DISTRICT 
Project was approved by the Chief of Engineers, October 
31, 1966 (with modification adding Mauls Creek approved 
June 16, 1967), under Section 205, 1948 Flood Control Act, 
as amended. 
Local cooperation. Local interests must provide lands, 
easements, rights-of-way, utility relocations and alterations, 
and highway or highway-bridge construction and 
alterations necessary for construction; hold the United 
States free from damages; maintain and operate project 
after completion; contribute, in cash, 31.4 percent of construction 
costs, currently estimated at $141,000; and prevent 
future encroachment. Formal request has not been 
made. 
Operations and results during fiscal year. New work: 
Project reanalysis cost $921. 
Condition at end of fiscal year. Project reanalysis and 
environmental studies have been completed. The project 
has been terminated due to the State of N. C. not issuing a 
water quality certification. 
21. STUART, VA. 
Location. The project is located on the South Mayo 
River at Stuart, Va., above and below Route 8 highway. 
(See USGS quadrangle sheet, Stuart, Va.) 
Existing project. The recommended plan consists of a 
100-foot-bottom-width high flow diversion channel combined 
with downstream river widening. A wier will be placed 
across the entrance to the diversion channel and a bench 
channel design will be used for the downstream river 
widening. The South Mayo River above Route 8 highway 
will be widened to a 50-foot bottom width, using a 
trapezoidal channel design and the commercial site northwest 
of Route 8 will be filled to the elevation of approximately 
the 200-year frequency flood. All river widening, 
except for a short distance above Route 8, will be done on 
the north bank. Estimated Federal cost of construction is 
$2,280,000. The project was approved by the Chief of 
Engineers on February 1, 1985, under Section 205, 1948 
Flood Control Act, as amended. 
Local cooperation. Local interests must provide all 
lands, easements, rights-of-way, including suitable borrow 
and spoil disposal areas, and all alterations and relocations 
of buildings, transportation facilities, storm drains, 
utilities, and other structures and improvements 
necessary for construction; hold and save the United 
States free from damages; maintain and operate the project 
after completion; assume full responsibility for all project 
costs in excess of the Federal cost limitation of $4 
million; prescribe and enforce regulations to prevent 
obstruction or encroachments; continue to enforce flood 
plan regulations that comply with FEMA guidelines; and 
at least annually, inform affected interests regarding the 
limitations of the protection afforded by the project. Formal 
assurances have been received. 
Operations and results during fiscal year. New work: 
Construction continued at a cost of $1,623,188. 
Condition at end of fiscal year. A construction contract 
was awarded May 16, 1986, and is scheduled for completion 
in November 1987. 
22. YADKIN RIVER BASIN, N. C. AND S. C. 
Location. The river rises on the eastern slope of the 
Blue Ridge Mountains in western North Carolina, flows 
generally easterly about 100 miles to the vicinity of Donnaha, 
North Carolina, thence southeasterly 104 miles to its 
confluence with Uwharrie River near Badin, North 
Carolina, where its name changes to Great Pee Dee River. 
(See U.S. Geological Survey map of North Carolina.) 
Existing project. The Flood Control Act of July 24,1946, 
authorized construction of four flood control dams in the 
Upper Yadkin River Basin, two on the Yadkin River above 
Wilkesboro, North Carolina, and two on Reddies River, a 
tributary stream. Studies made subsequent to authorization 
established the economic advantage of providing 
needed flood-control storage in only two reservoirs, one on 
the Reddies and one on the Yadkin. Present planning considers 
only the two-reservoir plan, W. Kerr Scott Dam and 
Reservoir constructed 1962 and Reddies River Lake. W. 
Kerr Scott was transferred to the Wilmington District 
from Charleston in fiscal year 1980. Any future work on 
Reddies River will also be done by the Wilmington 
District. (See Table 6-J on Dams and Reservoirs.) 
22A. W. KERR SCOTT DAM AND RESERVOIR, N. C. 
Location. W. Kerr Scott Dam and Reservoir is on 
Yadkin River, North Carolina, about 6 miles upstream 
from Wilkesboro. At full flood-control pool elevation (1,075 
feet mean sea level), the reservoir extends 15.7 miles 
upstream to the Wilkes-Caldwell County line. 
Existing project. The project consists of a rolled earthfill 
dam 1,740 feet long, with top of dam at elevation 1,107.5 
feet mean sea level or about 148 feet above streambed 
elevation; a spillway near the north abutment of the dam 
in a rock cut with crest elevation 1,075; and outlet works 
consisting of an intake structure, control tower, and a circular 
concrete conduit 12.25 feet in diameter through the 
base of the dam near the south abutment. The reservoir 
has a gross capacity of 153,000 acre-feet of which 112,000 
acre-feet are reserved for flood control, 33,000 acre-feet 
will be used as required for water supply, and 8,000 acrefeet 
being contained in the minimum pool. Estimated cost 
is $9,110,000 (1983) for new work. The existing project was 
authorized by the 1946 Flood Control Act. 
Local cooperation. Requirements fully satisfied. For 
details, see page 413 of Annual Report for 1963. 
Operations and results during fiscal year. Maintenance: 
Paving of recreational roads cost $8,833. Rehabilitation of 
campsites was accomplished at a cost of $49,135. Normal 
operation and maintenance cost $1,128,116 for a total of 
$1,186,084. Maintenance and operation of dams cost 
$66,678. 
Condition at end of fiscal year. The project was commenced 
in August 1960 and placed in operation for flood 
control and water storage purposes in August 1962. 
6-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
23. INSPECTION OF COMPLETED FLOOD CONTROL 
PROJECTS 
To determine the extent of compliance with approved 
regulations for maintenance and operation, inspections 
were made for the following projects during fiscal year 
1987: Ellis Swamp, Gates County, N. C.; Gapway Swamp, 
Columbus County, N. C.; Old Field Swamp, Robeson County, 
N. C.; Gardners Creek, Martin County, N. C.; New 
River, Onslow County, N. C.; Pungo Creek, Beaufort County, 
N. C.; South Creek, Beaufort County, N. C.; Pungo 
River, Beaufort County, N. C.; and Filberts Creek, Edenton, 
N. C.; Pantego and Cucklers Creek, Beaufort County, 
N. C.; White Oak Dike, Bladen and Pender Counties, N. C.; 
Ellerbe Creek, Durham County, N. C.; Pasquotank Dike, 
Pasquotank County, N. C.; Perquimans River, Perquimans 
County, N. C.; Core Creek, Craven County, N. C.; 
Princeville Dike, Edgecombe County, N. C.; Swift Creek, 
Pitt County, N. C.; Carolina Beach, New Hanover County, 
N. C.; Wrightsville Beach, New Hanover County, N. C.; 
Goldsboro, Neuse River, Wayne County, N. C.; Broad 
Creek, Beaufort County, N. C.; Little Rockfish Creek, 
Hope Mills, N. C.; Black River, Harnett County, N. C.; Lick 
Run, Roanoke, Va.; Deep Creek, Edgecombe County, N. C.; 
Joyce Creek, Camden County, N. C.; Ararat River, Surry 
County, N.C.; and Leith Creek, Scotland County, N. C. 
Responsible local officials were advised of inadequacies in 
maintenance and operation on local flood protection works 
where appropriate. Cost for the period was $35,000. Total 
cost to September 30, 1987, was $374,559, charged to 
operations. 
24. FLOOD CONTROL WORK UNDER SPECIAL 
AUTHORIZATION 
Flood control activities pursuant to Section 205, Public 
Law 858, 80th Congress, as amended (preauthorization). 
(See Table 6-K.) 
Emergency flood control activities and hurricane flood 
and shore-protection activities at Federally authorized 
projects (Public Law 99, 84th Congress, and antecedent 
legislation). 
National Emergency Preparedness Program cost 
$85,157. Disaster Preparedness Program cost $102,794. 
Field surveys for the February - April 1985 flooding on the 
Roanoke River cost $11,261. 
Multiple-Purpose Projects, Including Power 
25. ROANOKE RIVER BASIN, VA. AND N. C. 
Location. The project is on the Roanoke River and its 
tributaries in Virginia and North Carolina within a radius 
of 100 miles from Danville, Virginia. 
Existing project. The Flood Control Act of 1944 approved 
a general plan for the comprehensive development of 
the Roanoke River Basin for flood control and other purposes, 
and authorized construction of John H. Kerr and 
Philpott Reservoirs. (See Table 6-J for a list of dams and 
reservoirs included in the comprehensive plan.) 
Local cooperation. None required. John H. Kerr and 
Philpott Reservoirs are the only projects in the comprehensive 
plan that have been authorized for construction. 
(See Table 6-J on Dams and Reservoirs.) 
25A. JOHN H. KERR DAM AND RESERVOIR, VA. 
AND N. C. 
Location. The project is on Roanoke River, about 178.7 
river miles above its mouth, in Mecklenburg County, 
Virginia, and 20.3 miles downstream from Clarksville, 
Virginia. The reservoir extends upstream on Roanoke 
River 56 miles and on Dan River 34 miles. 
Existing project. The authorized project provides for a 
concrete gravity dam with wing and saddle dikes on the 
right and left banks, with a total length of about 22,285 
feet. The reservoir is operated as a unit of a coordinated 
system of reservoirs in the Roanoke River Basin for 
control of floods, generation of hydroelectric power, 
regulation of low-water flow, and for other purposes. The 
power installation is 204,000 kilowatts. (For further details 
see Annual Report for 1962.) Estimated cost is $67,529,000 
(1983) for construction and $24,521,000 for lands and 
damages, including relocation of highways, railroads, and 
utilities, a total of $92,050,000 for new work. The existing 
project was authorized by the 1944 Flood Control Act. 
Local cooperation. None required. 
Operations and results during fiscal year. New work: 
Cost-sharing with the State of N. C. at various sites cost 
$373. Maintenance: Cost adjustments on preservation of 
archeological sites at Satterwhite Point caused a decrease 
of $40. Stability analysis of the dam cost $3,497. 
Construction of the management center was completed at 
a cost of $638,346. Design and repair of highway bridge 
cost $356,301. Study on impact of water withdrawals cost 
$196. Work on the South Boston litigation cost $26,602. 
Work on the fire protection system for the powerhouse 
cost $76,904. Work on the fire extinguishing and 
suppression system cost $2,842. Dam break model analysis 
cost $161. Replacement of the powerhouse computer was 
initiated at a cost of $34,966. Real estate work in the South 
Boston area cost $7,472. Periodic inspection of the dam 
bridge cost $5,900. Final guide taking line study cost 
$10,097. Flood damage and benefit updating system cost 
$936. Construction of a washhouse at Longwood and a 
dump station and washhouse at Northland Park was 
completed at a cost of $2,450. Investigation and stability 
analysis of earth dikes cost $2,485. Design of courtesy 
docks cost $22,774. Replacement of guard rail at Island 
Creek dam cost $48,380. Design of Northbend Park water 
system improvements cost $76,828. Design for 
recreational road paving cost $16,236. Design for 
replacement of powerhouse roof cost $3,278. Normal 
operation and maintenance cost $3,969,483 for a total of 
$5,306,094. Maintenance and operation of dams cost 
$66,678. 
Condition at end of fiscal year. Project is complete 
except for additional recreational facilities. Production of 
power and protection from floods are provided by project. 
6-14

WILMINGTON, N. C., DISTRICT 
25B. PHILPOTT LAKE, VA. 
Location. On Smith River, Virginia, 44.3 miles above its 
junction with Dan River, and 35 miles upstream from 
Virginia-North Carolina State line in Franklin and Henry 
Counties. 
Existing project. The authorized project provides for a 
concrete gravity dam 892 feet long and with a maximum 
height of 220 feet. Reservoir is operated as a unit of a coordinated 
reservoir system for flood control in the Roanoke 
River Basin, generation of hydroelectric power, regulation 
of low-water flow, and for other purposes. The powerhouse 
has a total installation of 14,000 kilowatts. (For further 
details see Annual Report for 1962.) Federal cost estimate 
is $13,933,000 (1983) for construction and $1,157,000 for 
lands and damages, a total of $15,090,000. Existing project 
was authorized by 1944 Flood Control Act. 
Local cooperation. None required. 
Operations and results during fiscal year. Maintenance: 
Construction of management and visitors center was continued 
at a cost of $369,604. Sluice bulkhead was completed 
at a cost of $356. Replacement of the powerhouse computer 
was initiated at a cost of $10,596. Condition survey of 
a crack cost $12,400. Normal operation and maintenance 
cost $1,299,709, for a total of $1,692,665. Maintenance and 
operation of dams cost $66,678. 
Condition at end of fiscal year. The project is complete 
except for additional recreational facilities, and is providing 
power and flood protection. 
26. SCHEDULING FLOOD CONTROL RESERVOIR 
OPERATIONS 
B. Everett Jordan Dam and Lake, located in the Cape 
Fear River Basin, North Carolina, began fiscal year 1987 at 
elevation 211.60 feet, MSL or 4.40 feet below normal pool. 
The spring and summer of 1986 turned out to be the worst 
drought the Cape Fear River Basin has experienced over 
the period of record going back to 1908. Declining inflows 
lowered the lake elevation to 207.85 feet MSL or 8.15 feet 
below normal pool on November 12, 1986, utilizing 67% of 
the total conservation pool storage. This is the lowest level 
for Jordan Lake since impoundment in February of 1982. 
As a result of the drought conditions and a rapidly declining 
lake level, the State of North Carolina temporarily 
lowered the downstream water quality target flow at Lillington, 
N. C. Above average rainfall during November and 
December, along with reduced downstream target flows 
helped to produce a steady rise in Jordan Lake. On 
January 3,1987, Jordan Lake was at the normal pool elevation 
of 216.00 feet MSL. On January 23 and April 19, two 
major flood peaks occurred in which Jordan Lake reached 
elevation 221.70 and 226.80 feet MSL respectively. A third 
flood peak of 230.15 feet MSL on March 4 was the maximum 
elevation for the fiscal year and since impoundment 
in February 1982. At this point, 49% of the flood control 
pool storage was utilized. During the months of May 
through the middle of July, the reservoir level fluctuated 
near normal pool. However in late July, a gradual lake 
level drawdown began as a result of below average rainfall. 
Jordan Lake had fallen to elevation 212.28 feet MSL 
by September 7 when heavy rainfall refilled the lake to 
near normal pool. Jordan Lake ended the fiscal year at 
elevation 214.39 feet MSL or 1.61 feet below normal pool. 
Flood damages prevented during fiscal year 1987 were 
$7,665,000 which makes the cumulative total since impoundment 
of the project equal to $11,367,000. Total cost 
of functional operation for the period was $146,190. 
Falls Lake, located in the Neuse River Basin, North 
Carolina, began fiscal year 1987 at elevation 248.26 feet 
MSL or 1.84 feet below normal pool. Below normal rainfall 
and continuing drought conditions experienced during 
most of 1986 produced a gradual drawdown of the lake to 
elevation 245.95 feet MSL on November 26 which was the 
minimum level for the fiscal year. Rainfall during late 
December and early January ended the drought conditions 
and brought the lake level back to near the normal pool 
level of 250.1 feet MSL. Above normal rainfall during mid- 
January resulted in a lake level rise to elevation 255.14 
feet MSL on January 24. The lake level returned to normal 
by mid-February. Very heavy rainfall caused Falls Lake to 
rise to elevation 258.55 feet MSL on March 3 which was 
the maximum elevation for the fiscal year and also the 
highest level since permanent impoundment began in 
January 1983. Heavy rainfall occurred again during mid- 
April and resulted in a rise of the lake level to elevation 
254.94 feet MSL on April 18. The lake level remained near 
normal through May and most of June. Below normal rainfall 
from May through early September caused a gradual 
drawdown of the lake level to elevation 247.31 feet MSL on 
September 6. After rising slightly above elevation 248.0 
feet MSL during mid-September, Falls Lake ended the 
fiscal year at 247.51 feet MSL. Total flood and conservation 
storage utilized during the year was 54 percent and 45 
percent respectively. Flood damage prevented during 
fiscal year 1987 were $12,839,000 which makes the 
cumulative total since inception of the project equal to 
$21,558,000. Total cost of functional operation for the 
period was $122,631. 
John H. Kerr Dam and Reservior, located in the 
Roanoke River Basin, Virginia and North Carolina, began 
fiscal year 1987 at elevation 295.38 feet MSL or 4.12 feet 
below rule curve. Below normal rainfall and drought conditions 
experienced during most of 1986 continued through 
October causing the minimum elevation of the fiscal year 
of 294.05 feet MSL or 4.55 feet below rule curve on October 
14. The reservoir level gradually rose to rule curve on 
November 19. Above normal rainfall with periods of heavy 
rainfall occurred over the Roanoke River Basin during 
November 1986 to April 1987 and marked the end of the 
drought conditions. Minor rises in reservoir level occurred 
in December and January. Increasing inflows in March and 
April produced sharp reservoir rises to 312.49 feet MSL on 
March 6 and 319.61 feet MSL on April 29, respectively. 
The latter reservoir peak was the maximum elevation of 
the fiscal year and also the maximum elevation since impoundment 
in 1952. During this flood, five tainter gates 
were opened 1 foot on April 29 to prevent the reservoir 
level from rising above top of flood pool elevation, 320 feet 
6-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
MSL. All tainter gates were closed on April 30. The reservoir 
level was lowered to the rule curve elevation of 301.7 
feet MSL on June 2. After a minor rise on July 16, the 
reservoir level gradually dropped to elevation 295.95 feet 
MSL on August 28 or 3.55 feet below rule curve. Heavy 
rainfall in September caused a reservoir level rise to 
307.31 feet MSL on September 14. The reservoir level was 
at 300.40 feet MSL or 0.90 feet above rule curve at the end 
of the fiscal year. The 13-foot minimum stage required in 
the lower Roanoke River at Weldon for striped bass fish 
spawning was met from April 15 to June 19 by flood 
releases and fish augmentation flows from John H. Kerr. 
The total flood and current contractual power pool storage 
utilized during the fiscal year was 97 percent and 86 percent, 
respectively. Gross generation for the fiscal year 
amounted to 660,733,700 kilowatts hours and net marketed 
power revenue was $5,884,683 making a cumulative total 
since inception of $126,098,711. Flood damage prevented 
by John H. Kerr project during the fiscal year was 
$63,000,000 which makes the cumulative total since the 
project began equal to $139,207,000. The total cost of functional 
operation for the fiscal year was $255,776. 
Philpott Lake, located on the Smith River in the Dan 
River Basin, Virginia, began fiscal year 1987 at elevation 
963.81 feet MSL or 7.69 feet below the rule curve. Below 
normal rainfall during October, and continuing drought 
conditions lowered the lake level to the minimum elevation 
for the fiscal year of 962.21 feet MSL or 9.29 feet below the 
rule curve on October 31. From November to January, the 
lake level gradually recovered and returned to the rule 
curve by mid-January as rainfall was above normal. The 
lake level remained near the rule curve for the last half of 
January and through February. During the first week in 
March, heavy rainfall raised the lake level to 979.05 feet 
MSL on March 2 but a gradual drawdown returned the 
lake level to slightly above the rule curve by the end of the 
month. Excessive rainfall during the month of April raised 
the lake level to 979.09 feet MSL on April 17 and to 977.11 
feet MSL on April 25. A new record high rainfall amount of 
10.84 inches for the month of April was recorded for the 
area above Philpott Dam. From May through August, 
below normal rainfall produced a gradual drawdown of the 
lake to slightly below the rule curve. The lake level rose to 
the maximum elevation for the fiscal year, 979.52 feet MSL 
or 7.29 feet above the rule curve, on September 8 following 
heavy rainfall in the area. The rainfall gage at Philpott 
Dam received 8.28 inches of rain on September 8 which 
sets a new maximum daily amount for the period of record. 
Philpott Lake ended the fiscal year at 971.74 feet MSL or 
0.24 feet above the rule curve. The floods in March, April 
and September required water to be released through the 
sluice gates. Maximum controlled flood and dependable 
capacity power pool storage utilized during the fiscal year 
was 49 percent and 55 percent respectively. Flood 
damages prevented during the fiscal year were 
$120,165,000 which makes the cumulative total since inception 
of the project equal to $142,835,000. The project 
prevented $106,663,000 in flood damages during the 
September flood. Gross generation amounted to 37,104,130 
kilowatt-hours and power revenue was $1,337,038 for a 
cumulative total of $16,012,260 since inception. Total cost 
of functional operation for the period was $108,879. 
W. Kerr Scott Dam and Reservoir ,located in the 
Yadkin-Pee Dee River Basin, North Carolina, began fiscal 
year 1987 at elevation 1,025.62 feet MSL or 4.38 feet below 
normal pool. Below normal rainfall, declining inflows, and 
continuing drought conditions caused the reservoir level 
to drop to the minimum elevation of the fiscal year of 
1,023.78 feet MSL on October 25 or 6.22 feet below normal 
pool. Scott Reservoir returned to normal pool elevation 
1,030.00 feet MSL on November 27. After a rise to 1,036.60 
feet MSL on December 25, the reservoir level returned to 
normal pool on December 29 and remained near normal 
pool until February 28. Observed rainfall and inflows in 
March and April were above normal and maximum 
reservoir elevation for the fiscal year was on March 2 at 
1,047.03 feet MSL or 17.03 feet above normal pool. Additional 
rises of 1,036.50 feet MSL and 1,038.95 feet MSL 
occurred on April 16 and April 26, respectively. W. Kerr 
Scott Reservoir level was at normal pool on April 29 and 
remained near normal pool until July 15. Below normal 
rainfall caused a gradual reservoir level drop to elevation 
1,025.64 feet MSL on September 5. Heavy rainfall and 
increasing inflows caused a slight rise to 1,029.49 feet MSL 
on September 14 and W. Kerr Scott Resevoir ended the 
fiscal year at 1,027.46 feet MSL or 2.54 feet below normal 
pool. The total flood and conservation pool storage utilized 
during the fiscal year was 27 percent and 24 percent, 
respectively. Flood damages prevented during fiscal year 
1987 were $4,208,000 which makes the cumulative total 
since inception of the project equal to $64,292,000. Total 
cost of functional operation for the period was $93,495. 
General Investigations 
27. SURVEYS 
Cost for the period was $932,085, of which $78,748 was 
for navigation studies, $675,813 was for flood control 
studies, $56,280 was for beach erosion studies, $80,000 for 
Special Investigations, $3,133 for FERC licenses review, 
$3,000 for soil conservation service, $8,681 for hydrologic 
studies, and $26,430 for cooperation with states. 
28. COLLECTION AND STUDY OF BASIC DATA 
Flood plain information studies, as authorized by Section 
206, 1960 Flood Control Act, as amended, comprise 
compilation and dissemination, upon the request of a State 
or a political subdivision thereof, of information on floods 
and flood damages, including identification of areas subject 
to inundation by floods of various magnitudes and frequencies, 
and general criteria for guidance of Federal and non- 
Federal interests and agencies in the use of flood plain 
areas; and provide advice to other Federal agencies and 
local interests for their use in planning to ameliorate the 
flood hazard. Total costs for the period were $237,616. 
Total costs to September 30, 1987 were $4,046,649. 
6-16

WILMINGTON, N. C., DISTRICT 
29. CONTINUATION OF PLANNING 
AND ENGINEERING 
Continuation of Planning and Engineering for the 
Roanoke River Upper Basin, Virginia, Headwaters Area 
cost $212,740. 
30. PRECONSTRUCTION ENGINEERING AND 
DESIGN 
Preconstruction engineering and design (PED) for Wilmington 
Harbor, Northeast (Cape Fear) River, N. C., was initiated 
at a cost of $296,547. PED was initiated on Roanoke 
River Upper Basin, Virginia, Headwaters area at a cost of 
$289,264. 
6-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 6-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
1. Aquatic Plant Control 
(R&H Act of 1965) 
(Regular Funds) 
(Contributed Funds) 
2. Atlantic Intracoastal 
Waterway between 
Norfolk, Va. & St. 
Johns River, Fla. 
(Regular Funds) 
(Contributed Funds) 
3. Beaufort Harbor, N.C. 
(Regular Funds) 
(Contributed Funds) 
4. Belhaven Harbor, N.C. 
5. Cape Fear River, 
N. C. above 
Wilmington 
6. Channel from Back 
Sound to Lookout 
Bight, N. C. 
7. Far Creek, N. C. 
8. Lockwoods Folly 
River, N. C. 
(Regular Funds) 
(Contributed Funds) 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
Maint: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
Maint: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
70,000 
43,591 
876,080 
3,934,987 
3,760,711 
4,011,260 
1,551 
29,051' 
14,000 
-23,849 
186,771 
43,500 
44,344 
46,000 
50,440 
4,800,000 
4,057,998 
5,205,000 
5,345,207 
76,400 
76,379 
34,000 
1,106 
1,106 
424,400 
423,514 
136,200 
138,455 
517,800 
519,195 
146,400 
146,585 
- 636,000 
- 636,140 
-156,545 
-78,833 
361,000 
356,941 
92,65011 
235,600 
232,291 
100,000 
83,917 
6,469,000 
7,324,248 
9,777,600 
9,563,186 
718,630 
653,300 
58,000 
73,934 
135,000 
113,712 
8,742,100 
8,535,338 
-65,330 
411,400 
383,421 
31,809 
31,8091 
41,986,9732 
41,849,5872 
82,826,7603 
82,176,942 3 
86,851 
86,851 
667,300 
667,300 
- - 818,0405 
- - 818,0405 
51,200 444,000 3,342,9146 
51,221 444,000 3,342,9146 
- - 34,000 
- - 34,000 
- 116,142 284,975 
- 116,142 284,975 
- - 126,687 
- - 126,687 
13,800 73,200 127,606 
13,800 63,200 117,606 
- - 3,759,573' 
- - 3,759,573' 
618,000 967,000 13,720,614 8 
468,696 1,111,720 13,714,642 8 
13,000 
12,754 
63,000 
62,713 
1,100 
100 
746,200 287,500 
746,165 280,694 
88,328 
88,328 
2,332,171 
2,330,443 
164,642 
164,642 
1,183,004 
1,182,004 
241,2729 
241,27210 
3,673,346 
3,651,051 
92,650 
92,650 
6-18

WILMINGTON, N. C., DISTRICT 
TABLE 6-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
9. Manteo (Shallowbag) 
Bay, N. C. 
(Regular Funds) 
(Contributed Funds) 
10. Morehead City 
Harbor, N. C. 
(Regular Funds) 
(Contributed Funds) 
11. Ocracoke Inlet, N. C. 
12. Shallotte 
River, N. C. 
13. Silver Lake 
Harbor, N. C. 
(Regular Funds) 
(Contributed Funds) 
14. Waterway Connecting 
Pamlico Sound and 
Beaufort Harbor, N.C. 
(Regular Funds) 
(Contributed Funds) 
15. Wilmington Harbor, N. C. 
(Regular Funds) 
(Contributed Funds) 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Contrib: 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Contrib. 
Cost 
500,000 
407,323 
3,004,500 
3,981,556 
10,000 
1.906 
59,000 
169,188 
5,145,900 
5,166,545 
963,940 
965.826 
3,459,011 1,794,000 
3,554,083 1,745,676 
- 270,954 
- 55,000 
5,000 
5,435 
-208 
-208 
40,000 
154,087 
6,259 
8,224 
14,100 
14,741 
109,007 
4,126,500 
4,315,962 
6,262,000 
6,310,359 
261,550 
122,543 
11,000 
12,438 
165,000 
158,185 
4,598,700 
4,605,597 
156,000 
156,000 
1,E 
1, 
1,188 
1,188 
391,400 
338,255 
198,833 
198,837 
2,521,850 3,902,000 
2,513,647 3,997,363 
- 580,284 
255,004 553,500 
168,000 
177,145 
232,732 
232,732 
2,590,000 
2,553,489 
452,560 
398,651 
7,649,94512 
7,632,26412 
38,667,107 
38,653,219 
1,227,940 
1,221,732 
- 6,546,05313 
- 6,546,05313 
639,000 41,942,27314 
595,803 41,899,05414 
-54,579 1,174,636 
299,670 1,173,924 
- 346,240 
- 346,240 
11,700 919,844 
11,497 918,440 
- 18,181 
- 18,181 
39,519 210,475 
2,459 173,415 
- 184,284 
- 184,284 
831,000 4,481,618 
875,000 4,481,618 
- 75,000 
- 75,000 
- 502,567 
- 502,567 
22,878 2,412,199 
21,878 2,411,199 
- 2,452 
- 2,452 
- 18,715,22615 
- 18,715,226's 
2,322,500 53,569,82018 
2,357,116 53,564,9641" 
338,215 4,120,76017 
86,662 3,784,5187 
6-19 
f

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 6-A (Continued) 
See 
Section 
in Text Project 
16. Ararat River, N.C. 
(Regular Funds) 
(Contributed Funds) 
17A. B. Everett Jordan 
Dam and Lake, N. C. 
(Regular Funds) 
(Contributed Funds) 
17B. Randleman Lake, N. C. 
18. Carolina Beach and 
Vicinity, N. C. 
(Regular Funds) 
(Contributed Funds) 
19A. Falls Lake, N. C. 
20. Scuppernong River, N.C. 
21. Stuart, Va. 
22A. W. Kerr Scott Dam 
and Reservoir, N. C. 
25A. John H. Kerr Dam 
and Reservoir, VA & N.C. 
25B. Philpott Lake, Va. 
COST AND FINANCIAL STATEMENT 
Total Cost to 
Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
260,00018 
226,746 18 
12,300 
5,800,000 
5,304,189 
632,900 
601,634 
250,000 
298,513 
-295,000 
-120,714 
267,796 
1,450,000 
4,688,430 
601,000 
584,999 
33,776 
30,81222 
60,000 
35,771 
1,172,716 
1,268,670 
225,000 
76,081 
4,001,091 
4,128,796 
80,000 
118,049 
1,158,300 
1,223,739 
2,000,000 
280,590 
1,000,000 
22,366 
6,041,000 
6,145,290 
822,400 
789,652 
86,195 
803,000 
835,817 
992,200 
898,787 
5,200,000 
4,388,394 
917,200 
901,339 
43,000 
39,76722 
115,000 
127,330 
1,103,200 
1,130,085 
4,550,000 
4,579,003 
4,047,200 
4,168,199 
-50,000 
30,222 
1,368,100 
1,315,095 
997,540 
2,765,469 
1,103 
8,109,000 
8,595,667 
814,400 
879,704 
27,356 
-40,739 
-52,624 
40,789 
2,694,000 
3,876,795 
1,748,000 
1,461,526 
14,830 
570,000 
202,768 
1,216,100 
1,159,355 
5,400 
199,367 
6,857,000 
6,576,725 
-5,400 
22,770 
2,089,000 
2,082,671 
292,460 
308,711 
-110,446 
878,385 
9,834,000 
8,662,787 
911,000 
893,708 
100,000 
20,000 
490,000 
498,881 
17,840 
7,045,000 
5,969,059 
1,164,000 
1,331,436 
-650 
92122 
1,540,000 
1,623,188 
1,236,000 
1,252,762 
373 
5,222,900 
5,372,772 
1,672,000 
1,759,343 
6-20 
4,000,000 
4,000,000 
901,854 
901,854 
123,991,641 
120,389,664 
5,237,35619 
5,158,50220 
1,821,389 
1,741,389 
4,660,588 
4,643,067 
7,898,533 
7,866,932 
5,694,96521 
5,694,96521 
142,059,996 
140,268,566 
5,439,20019 
5,241,678 20 
234,032 
234,032 
2,330,00023 
2,031,53324 
8,841,326 
8,841,326 
13,802,54825 
13,658,26726 
94,402,927 
94,398,316 
65,074,942 27 
64,533,769 28 
14,796,384 
14,796,384 
20,617,306 29 
20,491,97130 
i

WILMINGTON, N. C., DISTRICT 
TABLE 6-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
1. Includes $2,369 refund to local interests in FY 82. 
2. Includes $198,707 for previous projects. 
3. Includes $107,634 for previous projects. 
4. Includes $13,934 refund to local interests. 
5. Includes $25,000 for previous projects. 
6. Includes $12,854 for previous projects. 
7. Includes $149,119 for previous projects. 
8. Includes $8,178 for previous projects. 
9. Includes preauthorization study funds: FY 64, $3,000; 
FY 65, -$2,755; FY 71, $8,000; FY 72, $2,000; FY 74, $9,000; FY 
75, $25,000; FY 76 & 76T, $20,000; FY 77, $2,500; FY 78, $8,800; 
FY 79, $3,000; FY 81, $1,680; and preconstruction planning 
funds: FY 80, $15,000 and FY 81, $19,320. 
10. Includes preauthorization study costs: FY 64, $219; FY 
65, $26; FY 71, $8,000; FY 72, $1,448; FY 73, $552; FY 74, $9,000; 
FY 75, $11,925; FY 76 & 76T, $27,977; FY 77, $7,598; FY 78, 
$7,449; FY 79, $4,351; FY 81, $1,680; and preconstruction planning 
costs: FY 80, $5,686 and FY 81, $1,471. 
11. Includes $69,145 refund to local interests. 
12. Adjusted by $6,361 to reflect actual cost. 
13. Includes $44,484 for previous projects. 
14. Includes $284,557 for previous projects. 
15. Includes $4,625,614 for new work on previous projects. 
16. Includes $602,614 for previous projects. 
17. Includes refunds to local interests: FY 78, $92,374; FY 
79, $8,000; FY 80, $14,007; FY 81, $1,847; FY 82, $2,823; FY 85, 
$60,000. 
18. Includes $6,924 preauthorization costs. 
19. Includes maintenance and operation of Dams funds: 
FY 87, $66,678. 
20. Includes maintenance and operation of Dams costs: FY 
87, $66,678. 
21. Includes refunds to local interests: FY 83, $400,000; FY 
84, $128,345; FY 85, $82,600. 
22. Preauthorization cost. 
23. Includes preauthorization study funds: FY 83, $45,000; 
FY 84, $9,986; and preconstruction funds: FY 84, $50,014; FY 
85, $115,000. 
24. Includes preauthorization study costs: FY 83, $42,496; 
FY 84, $12,490; and preconstruction costs: FY 84, $23,281; FY 
85, $127,330. 
25. Includes Special Recreation Use Fees funds: FY 74, 
$4,000; FY 75, $5,500; FY 76 & 76T, $3,600; FY 77, $5,800; FY 
78, $7,200; FY 79, $8,000; FY 80, $10,000; FY 81, $10,000; FY 82, 
$11,040; FY 83, $7,000; FY 84, $9,000; and maintenance and 
operation of Dams funds; FY 87, $66,678. 
26. Includes Special Recreation Use Fees costs: FY 74, 
$4,000; FY 75, $4,400; FY 76 & 76T, $4,666; FY 77, $5,193; FY 
78, $6,824; FY 79, $7,506; FY 80, $11,312; FY 81, $9,688; FY 82, 
$9,727; FY 83, $7,000; FY 84, $8,444; FY 85, $2,379; and 
maintenance and operation of Dams costs: FY 87, $66,678. 
27. Includes Special Recreation Use Fees funds: FY 74, 
$35,000; FY 76 & 76T, $48,000; FY 77, $51,400; FY 78, $115,100; 
FY 79, $63,000; FY 80, $60,000; FY 81, $80,000; FY 82, $67,160; 
FY 83, $77,759; FY 84, $73,000; and maintenance and operation 
of Dams funds: FY 79, $167,646; FY 87, $66,678. 
28. Includes Special Recreation Use Fees costs: FY 75, 
$35,000; FY 76 & 76T, $13,606; FY 77, $85,692; FY 78, $114,604; 
FY 79, $1,120; FY 80, $118,718; FY 81, $83,760; FY 82, $67,160; 
FY 83,$77,759; FY 84, $67,850; FY 85, $5,149; and maintenance 
and operation of Dams costs: FY 79, $167,350; FY 80, $296; FY 
87, $66,678. 
29. Includes Special Recreation Use Fees funds: FY 75, 
$47,000; FY 78, $40,400; FY 79, $22,000; FY 80, $25,000; FY 81, 
$20,000; FY 82, $20,240; FY 83, $21,000; FY 84, $19,000; and 
maintenance and operation of dams funds: FY 87, $66,678. 
30. Includes Special Recreation Use Fees costs: FY 75, 
$13,741; FY 76 & 76T, $31,666; FY 77, $1,593; FY 78, $39,771; 
FY 79, $22,629; FY 80, $24,619; FY 81, $20,381; FY 82, $20,240; 
FY 83, $21,000; FY 84, $19,000; and maintenance and operation 
of Dams costs: FY 87, $66,678. 
6-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 6-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 25, 1912 
July 25, 1912 
August 8, 1917 
July 18, 1918 
Jan. 21, 1927 
July 3, 1930 
March 4, 19332 
June 26, 19343 
August 26, 1937 
August 26, 1937 
June 20, 1938 
June 20, 1938 
March 2, 1945 
June 30, 1948 
May 17, 1950 
May 17, 1950 
September 3, 1954 
Nov. 29, 1963, 
sec. 107 
July 14, 1960 
April 7, 1966, 
sec. 107 
July 14, 1960 
Nov. 7, 1966 
Nov. 7, 1966 
Dec. 31, 1970 
ATLANTIC INTRACOASTAL WATERWAY BETWEEN 
NORFOLK, VA., and ST. JOHNS RIVER, 
FLA. (See Section 2 of text) 
Original route of the Norfolk-Beaufort Inlet section. 
Purchase of canal. 
Change in route; following changes approved by 
Secretary of War, April 14, 1919: 
Albemarle Sound-Pamlico Sound section: Changed from 
"Alligator River-Rose Bay route" to "Alligator River- 
Pungo River route." 
Pamlico Sound-Neuse River Section: Changed from 
"Pamlico Sound-Brant Shoal Neuse River route" to 
"Goose Creek-Bay River route." 
Alligator River-Pungo route (proposed land cut connecting 
the rivers): Changed from a straight line to a bent 
line approaching nearer town of Fairfield, N. C. 
A 12-foot channel 90 feet wide from Beaufort to Cape 
Fear River, N. C., including highway bridge and tidal 
lock.4 
An 8-foot channel 75 feet wide from Cape Fear River to 
Winyah Bay, S. C. 
Construct a suitable bridge near Fairfield, N. C. 
Operating and care of works of improvements provided 
for with funds from War Department appropriations for 
rivers and harbors. 
Increasing dimensions of waterway to 12 feet deep and 
90 feet wide. 
A 12-foot side channel 90 feet wide to Swansboro. 
A yacht basin near Southport, 12 feet deep, 230 feet 
wide, and 450 feet long, with connecting channel. 
A 6-foot channel 90 feet wide from New River Inlet to 
Inland Waterway. 
Six mooring basins.5 
A 12-foot channel in New River. 6 
Vicinity of Fairfield - drainage. 
Masonboro Inlet and connecting channels, including jetties 
at the inlet.7 
A 12-foot channel and basin in Peltier Creek.8 
A 6-foot channel 90 feet wide from Intracoastal Waterway 
to Bogue Inlet gorge. 
An 8-foot channel 150 feet wide through New Topsail Inlet, 
thence a 7-foot channel 80 ft. wide to Intracoastal 
Waterway by way of Old Topsail Creek; and a 7-foot 
channel 80 feet wide in Banks Channel from New Topsail 
Inlet, paralleling barrier beach, to Intracoastal 
Waterway. 
Maintenance of a channel, 6 feet deep, 80 feet wide, and 
8,000 feet long, from the through channel of the waterway 
to and including a basin of the same depth, 130 feet 
wide and 180 feet long at Carolina Beach. 
Maintenance of general navigation features of N. C. 
State Ports Authority Small Boat Harbor at Southport. 
Replacement of Federally-owned and operated highway 
bridges at Coinjock, Fairfield, Wilkerson Creek, 
Hobucken, and Core Creek. 
H. D. 391, 62d Cong., 2d sess. 
H. D. 589, 62d Cong., 2d sess. 
H. D. 1478, 63d Cong., 3d sess. 
and H. D. 1136, 64th Cong., 1st 
sess.' 
Approved by Secretary of War, 
May 15, 1919. 
H. D. 450, 69th Cong., 1st sess. 
H. D. 41, 71st Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 5, 72d Cong., 1st sess. 
Rivers and Harbors Committee, 
Doc. 6, 75th Cong., 1st sess.1 
Rivers and Harbors Committee 
Doc. 16, 75th Cong., 1st sess.1 
H. D. 549, 75th Cong., 3d sess.1 
H. D. 691, 75th Cong., 3d sess.' 
H. D. 660, 76th Cong., 3d sess.1 
H. D. 421, 80th Cong., 1st sess.' 
H. D. 723, 80th Cong., 2d sess.' 
H. D. 341, 81st Cong., 1st sess.' 
H. D. 379, 81st Cong., 1st sess.1 
Detailed Project Report 
April 1963. 
Detailed Project Report 
July 1965 
H. D. 515, 89th Cong., 2d sess.' 
H.D. 514, 89th Cong., 2d sess.' 
H. D. 142, 92nd Cong., 1st sess. 
6-22

WILMINGTON, N. C., DISTRICT 
TABLE 6-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
October 22, 1976 
August 13, 1968 
February 18, 1982, 
sec. 107 
July 14, 1960 
September 7, 1983, 
sec. 107 
July 14, 1960 
March 3, 1881 
March 2, 1907 
March 3, 1925 
July 3, 1930 
March 2, 1945 
May 17, 1950 
May 21, 1965, 
sec. 107 
July 14, 1960 
August 12, 1983, 
sec. 107 
July 14, 1960 
July 3, 1930 
Oct. 17, 1940 
Feb. 7, 1967 
sec. 107 
July 14, 1960 
August 30, 1935 
August 26, 1937 
March 2, 1945 
March 2, 1945 
Modification of terms of local cooperation to allow for 
full Federal funding of Wilkerson Creek and Coinjock 
Bridges. 
Mitigation of damages caused by north jetty at Masonboro 
Inlet. 
An 8-foot channel 150 feet wide through Carolina Beach 
Inlet to the Intracoastal Waterway. 
An 8-foot channel 150 feet wide from the gorge in 
Bogue Inlet through the ocean bar. 
BEAUFORT HARBOR, N. C. (See Section 3 of text) 
A 9-foot channel 200 feet wide through Bulkhead Channel 
to Beaufort; a 6-foot channel 100 feet wide to North 
River and Core Sound; and construct jetties on 
Shackleford Point. 
Repairs to Fort Macon jetties and additional jetties and 
shore protection. 
Bulkhead across Bird Shoal. 
Increase in depth to 12 feet in Bulkhead Channel, 
Gallants Channel, and in front of Beaufort. 
Increase in width and length of basin in front of 
Beaufort, all to 12 feet deep. 
Increase in depth to 12 feet and in width to 100 feet in 
Taylors Creek; transfer to Beaufort Harbor project. 
Channels 15 feet deep, 100 feet wide in Bulkhead, 
Gallants and Taylors Creek channels, and through turning 
basin in front of Beaufort; and harbor of refuge in 
Town Creek, 12 feet deep, 400 feet wide, and 900 feet 
long connected to Gallants Channel by channel 12 feet 
deep, 150 feet wide, and 1,400 feet long. 
A channel 14 feet deep, 70 feet wide, and 1,900 feet long, 
from Bulkhead Channel to a turning basin 14 feet deep 
150 feet wide, and 300 feet long near the upper end of 
Morgan Creek. 
SILVER LAKE HARBOR, N. C. (See Section 13 of 
text) 
Entrance channel, 5 feet deep and 50 feet wide, from 
Pamlico Sound to the 3-foot contour in the lake, and 
training wall at entrance. 
Channel, 10 feet deep, and anchorage basin of same 
depth, 100 feet wide across Big Foot Slough and 60 feet 
wide in entrance. 
Basin depth of 12 feet in Silver Lake Harbor; channels 
12 feet deep, 150 feet wide, in Teaches Hole and Big 
Foot Slough Channels and across Bluff Shoal; entrance 
channel, same depth, 60 feet wide; and training wall on 
south side of entrance channel. 
WATERWAY CONNECTING PAMLICO SOUND AND 
BEAUFORT HARBOR, N. C. (See Section 14 of text) 
A 7-foot channel 75 feet wide from Pamlico Sound to 
Beaufort Harbor via Wainright Channel. 
A 7-foot channel 75 feet wide to Atlantic. 
Channels 7 feet deep, 75 feet wide, at east and west 
ends of Harkers Island and side channel 5 feet deep, 75 
feet wide, with basin 150 by 130 feet, same depth, at Davis. 
A 7-foot side channel 75 feet wide, with basin 200 feet by 
500 feet, same depth, at Sealevel. 
H. D. 597, 94th Cong., 2d sess. 
Approved by OCE Oct. 2, 1980 
Detailed Project Report 
June 1980 
Detailed Project Report 
May 1983 
Annual Report, 1881, p. 1013 
Specified in act. 
Rivers and Harbors Committee 
Doc. 8, 68th Cong., 2d sess.' 
H. D. 776, 69th Cong., 2d sess. 1 
H. D. 334, 76th Cong., 1st sess.' 
H. D. 111, 81st Cong., 1st sess.1 
Detailed Project Report 
April 1965 
Detailed Project Report 
June 1983 
Rivers and Harbors Committee 
Doc. No. 3, 70th Cong., 1st sess. 
H. D. 325, 76th Cong., 1st sess.' 
Detailed Project Report 
July 9, 1965 
H. D. 485, 72d Cong., 2d sess.' 
Rivers and Harbors Committee 
Doc. 92, 74th Cong., 2d sess.' 
H. D. 99, 77th Cong., 1st sess.' 
S. D. 247, 77th Cong., 2d sess.' 
6-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 6-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
May 17, 1950 A 6-foot side channel 60 feet wide, with basin 100 feet by H. D. 68, 81st Cong., 1st sess.1 
about 600 feet, same depth, at Marshallberg. 
July 11, 1963, A side channel 7 feet deep, 70 feet wide to local harbor at Detailed Project Report 
sec. 107 Cedar Island and an access channel 6 feet deep, 60 feet Dec. 12, 1968 
July 14, 1960 wide and about 400 feet long to a basin same depth, 60 by 
100 feet. 
Sept. 22, 1967, An entrance channel 6 feet deep, 60 feet wide, from Back Detailed Project Report 
sec. 107 Sound to harbor of refuge 120 by 250 feet, same depth, at March 13, 1967 
July 14, 1960 west end of Harkers Island in Brook Creek. 
Feb. 24, 1969, A channel 7 feet deep, 70 feet wide, from existing side Detailed Project Report 
sec. 107 channel at Atlantic to a basin 600 by 180 feet, same depth, Dec. 21, 1967 
July 14, 1960 with a breakwater, between mouth of Little Port Brook 
and White Point. 
April 3, 1975, Deepening the existing 5-foot channel and basin at Davis Detailed Project Report 
sec. 107 to 7 feet. Feb. 8, 1974 
July 14, 196010 
1. Contains latest published maps. 
2. Public Law No. 443, 72d Cong. 
3. Permanent Appropriations Repeal Act. 
4. Tidal lock in land cut between Myrtle Sound and Cape 
Fear River, deauthorized September 23, 1986, under authority 
of Sec. 12, PL 93-251. 
5. Deauthorized August 5, 1977 under authority of Sec. 
12, PL 93-251. 
6. A 12-foot by 90-foot channel in New River from Intracoastal 
Waterway to and including a basin at Jacksonville, 
N.C. 
7. Jetties on each side of Masonboro Inlet. 
8. A 6-foot by 50-foot channel provided under Section 3, 
River and Harbor Act of March 2, 1945; 12-foot by 90-foot project 
deauthorized November 17, 1986 under authority of Sec. 
1002, PL 99-662. 
9. Included in the Public Works Administration Program, 
Jan. 3, 1934. 
10. Deauthorized by the Chief of Engineers March 31, 
1982. 
6-24

WILMINGTON, N. C., DISTRICT 
TABLE 6-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Report for Construction Maintenance 
Aquatic Plant Control1 
(R& H Act of 1958 and 1962) 
Atlantic Beach Channels, N. C. 
Avon Harbor, N. C.1 
Bay River, N. C.' 
Black River, N. C. 
Cashie River, N. C. 
Channel Connecting Thoroughfare Bay 
with Cedar Bay, N. C.' 
Channel from Pamlico Sound to Rodanthe, N. C.' 
Chowan River, N. C. 
Contentnea Creek, N. C.' 
Drum Inlet, N. C.' 
Edenton Harbor, N. C.' 
Fishing Creek, N. C.' 
Knobb's Creek, N. C.', 2 
Mackay Creek, N. C.' 
Neuse River, N. C.' 
Newbegun Creek, N. C. 
Northeast (Cape Fear) River, N. C.1 
Pamlico and Tar Rivers, N. C.' 
Pembroke Creek, N. C. 
Perquimans River, N. C.' 
Roanoke River, N. C.', ' 
Rollinson Channel, N. C.' 
Scuppernong River, N. C.' 
Smith Creek, Pamlico County, N. C.' 
Smiths Creek (Wilmington), N. C.' 
South River, N. C.' 
Stumpy Point Bay, N. C.' 
Swift Creek, N. C.' 
Trent River, N. C.', s 
Wallace Channel, Pamlico Sound, N. C. 
Waterway - Norfolk, Va. to Sounds of N. C. 
Waterway Connecting Swanquarter 
Bay with Deep Bay, N. C. 
Wrights Creek, N. C.1 
1969 
1976 
1986 
1950 
1969 
1950 
1975 
1975 
1950 
1941 
1979 
1960 
1922 
19613 
19383 
1982 
19283 
1950 
1986 
1976 
19103 
1983 
1986 
1950 
1984 
1950 
1936 
1984 
1940 
1968 
1965 
1976 
1984 
1984 
70,664 
29,101, 
74,096 
44,382 
12,358 
40,403 
69,610 
42,029 
64,395 
166,119 
73,750 
22,715 
80,500 
13,375 
477,2238 
4,802 
10,688 
674,651 
60,000 
13,750 
404,584 
589,105 
81,164 
113,273 
8,507 
12,452 
268,381 
1,600 
115,199 
132,834 
751,196 
911,099 
68,325 
66,630 
438,035 
49,627 
124,846 
15,905 
25,615 
5,685 
32,247 
1,050,579 
47,642 
8,633 
48,969 
6,273 
328,607 
247 
61,139 
822,978 
414 
550,409 
1,376,151 
80,682 
37,712 
18 
23,686 
736,815 
5,422 
143,579 
85,221 
2,893,812 
182,725 
166,602 
1. Completed. 
2. Transferred from Norfolk District (FY 1970); Meherrin 
River, N. C., Transferred to Norfolk District. 
3. Report of Norfolk District. 
4. Includes $2,055 refund to local interests. 
5. 8-foot modification deauthorized August 5, 1977, under 
authority of Sec. 12, PL 93-251. 
6. Includes $1,959 refund to local interests on Dawson 
Creek, N.C. 
7. 50-mile long channel above Palmyra Landing to Weldon 
deauthorized November 17, 1986, under authority of Sec. 1002, PL 
99462. 
6-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
TABLE 6-D 
For Last Cost to September 30, 1987 
Full Report 
Project See Annual Operation and 
Report For Construction Maintenance 
Fort Fisher and Vicinity, N. C. 1984 490,000 
Fort Macon Park, N. C.' 1973 620,000 - 
1. Uncompleted portion of project was deauthorized 
November 17, 1986, under authority of Sec. 1002, PL 99-662. 
6-26

WILMINGTON, N. C., DISTRICT 
TABLE 6-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Report For Construction Maintenance 
Black River, Harnett County, N. C.' 
Broad Creek, Beaufort County, N. C.' 
Brunswick County Beaches, N. C. 
(Cape Fear to North Carolina - 
South Carolina State Line)" 
Conetoe Creek, N. C.' 
Contentnea Creek, N. C.' 
Core Creek, N. C.' 
Deep Creek, Edgecombe County, N. C.' 
Ellerbe Creek, Durham County, N. C.' 
Ellis Swamp, Gates County, N. C.' 
Filberts Creek, N. C.' 
Gapway Swamp, N. C. & S. C.',' 0 
Gardners Creek, N. C.' 
Genoa Sewer Facility, Wayne County, N. C.' 
Goldsboro, Neuse River, N. C. 
Howards Mill Lake, N. C.12 
Joyce Creek, Camden County, N. C.' 
Leesville, Va. - Roanoke River, Sec. 32, Demo Project 
Leith's Creek, Scotland County, N. C.',' 
Lick Run, Roanoke, Va.' 
Little Rockfish Creek, Hope Mills, N. C.' 
Little Sugar Creek, Charlotte, N. C.','0 
New River, N. C.' 
New River, Onslow County, N. C.' 
Northeast (Cape Fear) River, N. C.' 
Old Field Swamp, N. C.',' 0 
Pantego Creek and Cucklers Creek, N. C. 
Pasquotank River, N. C. 
Perquimans River, N. C.' 
Pungo Creek, N. C.' 
Pungo River, N. C.' 
Reddies River Lake, N. C.'" 
Roaring River Lake, N. C.' 
Simmons Bay, N. C.' 0 
South Creek, N. C.' 
Swift Creek, Pitt and Craven Counties, N. C.' 
Tar River, N. C 
Tar River, N. C.' 
Tar River and tributaries, N. C.' 
Tar River, Princeville, N. C. 
Trent River, N. C.' 
Waccamaw River & Seven Creeks, N.C. & S.C.',' 0 
White Oak Dike, Bladen and Pender 
Counties, N. C.' 
Wrightsville Beach, N.C. 
1984 
1972 
1976 
1960 
1939-1943 & 1958 
1965 
1984 
1963 
1971 
1970 
1969 
1972 
1985 
1984 
1980 
1984 
1986 
1982 
1974 
1978 
1979 
1950 & 1956 
1972 
1961 
1969 
1963 
1960 
1961 
1972 
1971 
1980 
1978 
1963 
1971 
1966 
1964 
1947 
1943 
1967 
1953 
1961 
1963 
1983 
1. Project authorized by Chief of Engineers under special 
continuing authority. 
2. Includes $17,356 refund to local interests. 
3. Adjusted to reflect actual cost. 
4. Includes $3,081 refund to local interests. 
5. Includes $116,508 refund to local interests. 
6. Includes $1,519 refund to local interests. 
7. Includes $387 refund to local interests. 
8. Includes $338 refund to local interests. 
9. Adjusted $3,000 to include preauthorization cost prior to 
FY 1960. 
10. Transferred from Charleston District, FY 1980. 
11. Reclassified to inactive category February 3, 1976. 
12. Reclassified to deferred category October 2, 1980. 
13. Includes $61,585 refund to local interests. 
14. Transferred from Charleston District, FY 1984. 
15. Includes $1,057 refund to local interests. 
6-27 
475,574 
283,846 
572,114s 
29,867 
50,889 
236,2239 
394,055 
223,413 
138,1176 
37,7773 
374,005 
54,5976 
167,800 
50,430 
698,400 
606,189's 
364,425 
430,151 
1,280,317 
113,657 
763,022 
51,896 
580,977 
95,873 
86,600 
517,948 
80,931 
6,366 
582,270 
296,6022,3 
985,800 
370,000 
186,435 
194,367' 
611,096 
81,266 
18,624 
22,660 
390,249 
64,769 
67,821 
214,286 
3,013,188'3 
- 
623,687 
61,473 
-
-147

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 6-G DEAUTHORIZED PROJECTS 
For Last Full Report Federal Contributed 
See Annual Report Date Funds Funds 
Project For Deauthorized Expended Expended 
Adkin Branch, N. C. 
AIWW - Mooring Basins 
AIWW - Peltier Creek, 
12-foot project 
AIWW - Tidal Lock in Snows Cut 
Bodie Island, N. C. 
Cape Lookout, N. C. 
Conoho Creek, N. C. 
Contentnea Creek, N. C. 
Davis, N. C. 
Fort Macon State Park, 
N. C., Remaining Work 
Harbor of Refuge, N. C. 
Hominy Swamp, N. C. 
Hyde County Dike, N. C. 
MacKay Creek, N. C. 
Mann's Harbor, N. C. 
Mill Creek, N. C. 
Mocassin Swamp, N. C. 
Morehead City Harbor, N. C., 
Jetties at Beaufort Inlet 
Moyock Creek, N. C. 
Nahunta Swamp, N. C. 
Neuse River, N. C. 
Neuse River Barrier, N. C. 
Neuse River, 300 ft.-wide 
channel in front of 
New Bern 
North River Dike, N. C. 
Ocracoke Inlet Jetty, N. C. 
Ocracoke Island, N. C. 
Roanoke River, 50 mile long 
Channel from Palmyra 
Landing to Weldon 
Rockfish Creek, N. C. 
Six Runs Creek, N. C. 
Sweetwater Creek, N. C. 
Thoroughfare Swamp, N. C. 
Topsail Beach and 
Surf City, N. C. 
Tranters Creek, N. C. 
Trent River, Basins and 
Access Channels at 
New Bern, N. C. 
1. Deauthorized under authority of Sec. 12, PL 93-251. 
2. Deauthorized pursuant to the continuing authority provided 
the Chief of Engineers under Sec. 205 of the 1948 FC Act, as 
amended. 
3. Deauthorized pursuant to the continuing authority provided 
the Chief of Engineers under Sec. 208 of the 1954 Flood Control 
Act. 
4. Deauthorized pursuant to the continuing authority provided 
the Chief of Engineers under Sec. 107 of the R&H Act of 1960 
as amended. 
5. Deauthorized under authority of Sec. 1002, PL 9-662. 
6-28 
1982 
None 
None 
None 
None 
None 
1974 
1972 
1982 
1973 
1934 
1973 
None 
1976 
1973 
1973 
1973 
1986 
1973 
1973 
None 
None 
None 
None 
1986 
1975 
1983 
1976 
1971 
1973 
1976 
None 
1974 
None 
8 Sep. 812 
5 Aug. 771 
17 Nov. 865 
23 Sept. 861 
5 Aug. 77' 
5 Aug. 77' 
31 Mar. 782 
31 Mar. 783 
31 Mar. 82' 
17 Nov. 86 s 
1 Nov. 81' 
31 Mar. 782 
5 Aug. 77' 
31 Mar. 782 
31 Mar. 78^ 
31 Mar. 782 
31 Mar. 782 
17 Nov. 86 s 
31 Mar. 782 
31 Mar. 782 
31 Mar. 78' 
5 Aug. 77' 
5 Aug. 77' 
5 Aug. 77' 
17 Nov. 865 
17 Nov. 86 s 
17 Nov. 86 s 
31 Mar. 782 
31 Mar. 782 
31 Mar. 782 
31 Mar. 782 
5 Aug. 77' 
11 Jan. 852 
5 Aug. 77' 
219,477 
79,782 
4,250 
25,419 
1,396,653 
107,472 
130,900 
7,265 
116,395 
36,680 
64,416 
65,673 
30,911 
- 
129,592 
157,721 
64,977 
64,584 
132,767 
139,339

WILMINGTON, N. C., DISTRICT 
TABLE 6-H RECONNAISSANCE AND CONDITION SURVEYS 
Project Date Survey Conducted 
Rollinson Channel, N. C. August 1987 
Smiths Creek, Pamlico County, N. C. August 1987 
Waterway Connecting Pamlico Sound and Beaufort Harbor, N. C. September 1987 
NAVIGATION WORK UNDER SPECIAL AUTHORIZATION 
Navigation Activities Pursuant to Section 107, Public Law 86-645 (preauthorization) 
TABLE 6-I 
Study Identification Fiscal Period Cost 
Harkers Island Harbor,N. C. 137,670 
Walters Slough, N. C. 2,136 
White Oak River, N. C. 7,207 
Wilmington Harbor, N. C., Passing Lane' 39,740 
1. Includes $7,500 reimbursement to the revolving fund. 
6-29

TABLE 6-J DAMS AND RESERVOIRS 
See Miles Height Reservoir Power Estimated 
Section Project Name Nearest City River Above of Type Capacity Development Construe- Cost Lands Total 
in Text Mouth Dam (ft) (acre-feet) (kilowatts) tion and Damages 
17. Cape Fear B. Everett Jordan
2 
River Basin, Howards Mill
2 , 1 4 
N.C. Randleman
2 
Small reservoirs 
19. Neuse River Falls
2 
Basin, N.C. Wilson Mills 
Beulahtown 
Bakers Mills 
Little Buffalo 
Buckhorn 
Wiggins Mill 
Stantonsburg 
Great Swamp 
Black Creek 
Aycock Swamp 
Hillsboro 
Orange 
22. Yadkin River W. Kerr Scott, N.C. 
Basin, N.C.&S.C. 
S 25. Roanoke River John H. Kerr, Va., and 
O Basin, Va. and N.C. 
2 
N.C. Philpott, Va.
2 
Gaston, Va. and N.C. 
6 
Roanoke Rapids, N.C. 
7 
Smith Mountain, Va.
8 
Leesville, Va.
9 
Taber, Va. 
Melrose, Va. 
Randolph, Va. 
Stuart, Va. and N.C. 
Schoolfield, Va. and N.C. 
Moncure, N.C. 
Carthage, N.C. 
Randleman, N.C. 
Falls, N.C. 
Wilson Mills, N.C. 
Kenly, N.C. 
Princeton, N.C. 
Kenly, N.C. 
Wilson, N.C. 
Wilson, N.C. 
Stantonsburg, N.C. 
Fremont, N.C. 
Wilson, N.C. 
Fremont, N.C. 
Durham, N.C. 
Durham, N.C. 
Wilkesboro, N.C. 
Boydton, Va. 
Bassett, Va. 
Roanoke Rapids, N.C. 
Roanoke Rapids, N.C. 
Altavista, Va. 
Altavista, Vs. 
Altavista, Va. 
Brookneal, Va. 
Chase City, Va. 
Spray, N.C. 
Danville, Va. 
Haw 
Deep 
Deep 
Various 
Neuse 
Neuse 
Little 
Little 
Little Buffalo Creek 
Contentnea Creek 
Contentnea Creek 
Tisnot Swamp 
Great Swamp 
Black Creek 
Aycock Swamp 
Eno 
Little 
Yadkin-Pee Dee 
Roanoke 
Roanoke 
Roanoke 
Roanoke 
Roanoke 
Roanoke 
Roanoke 
Roanoke 
Roanoke 
Roanoke 
Roanoke 
4.3 
55.0 
85.0 
404.0 
178.7 
336.2 
144.9 
137.0 
314.2 
293.7 
275.0 
262.9 
227.8 
297.2 
265.9 
112 E 
106 E 
110 E 
20 to 70 + E 
92 E 
81 CG,E 
50 E 
53 E 
51 E 
63 E 
42 E 
36 E 
39 E 
33 E 
37 E 
136 E 
107 E 
148 E 
753,500 
233,000 
108,000 
923,000 
335,620 
201,000 
81,000 
36,000 
13,000 
119,000 
35,000 
48,000 
18,000 
17,000 
7,000 
123,000 
57,000 
153,000 
- 80,040,000 
- 18,874,000 
- 54,362,000 
- 73,403,000 
- 5,749,343 
144 CG,E 2,808,000 204,000 67,529,000 24,521,000 
220 CG
1 1 
108 CG,E 
75 CG 
244 CG 
95 CG,E 
54 CG 
110 CG,E 
147 CG,E 
138 E 
126 CG,E 
249,800 
432,000 
59,300 
825,000 
76,900 
34,000 
120,000 
350,000 
163,000 
248,000 
14,000 
54,000 
83,000 
41,000 
20,000 
12,000 
43,000 
48,000 
15,000 
80,000 
13,933,000 
27,000,000 
31,300,000 
28,000,000 
9,100,000 
8,000,000 
17,700,000 
22,100,000 
9,000,000 
27,800,000 
1. Includes highway, railroad, and utility relocations. 
2. For details, see individual report. 
3. Includes $3,900,000 presently allocated to water supply to be reimbursed in the future by 
local interests and $330,000 cash contribution for construction of ranger security buildings. 
4. Includes $12,400,000 presently allocated to water supply and $18,600,000 recreation and fish 
and wildlife to be reimbursed in the future by local interests. 
5. Exclusive of transmission lines. 
6. Construction completed in 1963 by Virginia Electric and Power Co. 
7. Based on modified plan developed in fiscal year 1949. Construction completed June 1955 by 
Virginia Electric and Power Co. 
8. Construction completed in February 1966 by Appalachian Power Co. 
9. Construction completed in June 1963 by Appalachian Power Co. 
10. Includes cost of earth dam on Whipping Creek. 
11. Authorizing legislation provided for earth dam; concrete gravity dam constructed. 
12. Includes $1,600,000 presently allocated to recreation and fish and wildlife. 
13. Includes $66,405,000 presently allocated to water supply, $7,951,000 allocated to recreation 
and $7,444,000 to flood control to be paid by local interests during construction. 
14. Reclassified to the deferred category October 2, 1980. 
Key 
E - Earth 
CG - Concrete Gravity
58,290,500 
14,726,000 
56,638,000 
91,597,000 
3,360,657 
138,330,000' 
33,600,000 
' 
111,000,000'" 
38,454,000 
165,000,000 
13,000,000 
9,300,000 
6,600,000 
1,100,000 
17,300,000 
6,700,000 
5,100,000 
1,800,000 
1,500,000 
550,000 
8,100,000 
3,500,000 
9,110,000 
92,050,0005 
15,090,000 
30,500,000 
32,100,000 
31,800,000 
10,100,000 
9,700,000 
23,700,000 o 
26,800,000 
10,100,000 
36,000,000 
0
0
'Si 
0
0
Iai 
x0 
1,157,000 
3,500,000 
800,000 
3,800,000 
1,000,000 
1,700,000 
6,000,000 
4,700,000 
1,100,000 
6,400,000

WILMINGTON, N. C., DISTRICT 
FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
Flood Control Activities Pursuant to Section 205, 
Public Law 858, 80th Congress, as amended 
TABLE 6-K (Preauthorization) 
Study Identification Fiscal Period Cost 
Blackberry Creek, Henry County, VA.2 7,500 
Buffalo Creek, Lee County, N. C.' 7,500 
Carolina Beach, N. C. 55,206 
Carvins Creek, Roanoke, VA. 49,492 
Chapel Hill, N. C. 21,947 
Crabtree Creek & Trib., Wake County, N. C. 128,751 
Dan River-Madison Wastewater Treatment Plant, Madison, N. C. 3 35,586 
Great Coharie Creek, N. C. 49,888 
Grifton, N. C.2 7,500 
Jordan Creek, Henry County, VA.2 7,500 
Little Creek, Jacksonville, N. C.2 7,500 
Lower Creek, Lenoir, N. C.' 67,544 
Peters Creek, Roanoke, VA. 89,120 
Siler City Streams, N. C.2 7,500 
Soules Swamp, Whiteville, N. C.2 5,500 
Tinker Creek and Tributaries, VA. 31,068 
1. Includes $40,000 contributed funds. 
2. Reimbursement to revolving fund. 
3. Section 14 project. 
6-31

CHARLESTON, S.C., DISTRICT * 
This district comprises all of South Carolina (except 
local watersheds draining into the Savannah River). It 
embraces the drainage basins tributary to the Atlantic 
Ocean between Little River and Port Royal Sound, 
except watersheds of Mackey and Skull Creeks, and 
excluding Hilton Head Island. 
IMPROVEMENTS 
Navigation 
1. Aquatic Plant Control, SC ................. 7-1 
2. Atlantic Intracoastal Waterway Between 
Norfolk, VA and St. Johns River, FL ....... 7-2 
3. Charleston Harbor, SC .................... 7-2 
4. Cooper River, Charleston Harbor, SC ....... 7-3 
5. Cooper River Seismic Modification, SC ...... 7-3 
6. Folly River, SC ........................... 7-4 
7. Georgetown Harbor, SC .................... 7-4, 
8. Jeremy Creek, SC ......................... 7-4 
9. Little River Inlet, SC & NC ................ 7-5 
10. Murrells Inlet, SC ......................... 7-5 
11. Port Royal Harbor, SC .................... 7-5 
12. Shipyard River, SC ....................... 7-6 
13. Town Creek, SC .......................... 7-6 
14. Reconnaissance And Condition Surveys ...... 7-6 
15. Other Authorized Navigation Projects ....... 7-6 
16. Navigation Work Under Special 
Authorization ............................. 7-6 
Beach Erosion 
17. Other Authorized Beach Erosion 
Control Projects .......................... 7-6 
18. Beach Erosion Work Under Special 
Authorization ............................. 7-6 
Flood Control 
19. Cooper River, Pompion Hill Chapel, SC ...... 7-7 
20. Scotts Creek, SC .......................... 7-7 
21. Inspection of Completed Flood Control 
Projects .................................. 7-7 
Navigation 
1. AQUATIC PLANT CONTROL, S.C. 
Location. The project includes all public waters in 
the State of South Carolina. 
Existing Project. The project provides for the control 
and progressive eradication of noxious aquatic 
plant growths from public waters in the combined 
interest of navigation, flood control, drainage, agriculture, 
fish and wildlife conservation, and public 
health. 
22. Other Authorized Flood Control Projects .... 7-7 
23. Flood Control Work Under Special 
Authorization ............................. 7-7 
Miscellaneous 
24. Streambank Erosion Under Special 
Authorization ............................ 7-7 
General Investigations 
25. Active Investigations ...................... 7-7 
Tables 
Table 7-A Cost and Financial Statement ..... 7-8 
Table 7-B Authorizing Legislation ........... 7-10 
Table 7-C Other Authorized Navigation 
Projects .......................... 7-13 
Table 7-D Navigation Work Under Special 
Authorization ..................... 7-13 
Table 7-E Other Authorized Beach Erosion 
Projects ........................... 7-13 
Table 7-F Other Authorized Flood Control 
Projects .......................... 7-14 
Table 7-G Flood Control Work Under 
Special Authorization .............. 7-14 
Table 7-H Active General Investigations ...... 7-15 
*All costs and financial statements for projects are 
listed at the end of this chapter. All other tables are referenced 
in text and also appear at the end of this 
chapter. 
Local Cooperation. Local interests must agree to 
hold the United States free from damages that may 
occur from operations performed in connection with 
this project and contribute 30 percent of the cost of field 
operations. The South Carolina Water Resources Commission 
is designated as the State's lead agency for 
aquatic plant management and meets local interest 
requirements. 
Operations and results during fiscal year. Aquatic 
plants now infest approximately 40,000 acres, with the 
7-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
worst problems being in Lake Marion. During FY 87, 
3,821 acres of aquatic plants in 30 water bodies were 
treated with herbicides. Grass carp were purchased 
and stocked in five lakes having a total surface area of 
108 acres. 
The cost of field operations in FY 87 was $467,853 and 
included $421,295 for the application of herbicides, 
$6,675 for the purchase and stocking of grass carp, 
$11,159 for aquatic plant surveys, and $28,724 for program 
management by the contractor. The cost of 
planning and contract administration was $134,790. 
Condition at the end of fiscal year. The project is 
ongoing. Federal costs for the project to date have been 
$2,715,092 for new work. 
2. ATLANTIC INTRACOASTAL WATERWAY 
BETWEEN NORFOLK, VA. AND ST. JOHNS 
RIVER, FL (CHARLESTON DISTRICT) 
Location. The project starts near Little River at the 
North Carolina-South Carolina state line and extends 
generally south along the coast of South Carolina 62 
miles to Winyah Bay; thence 63.5 miles to Charleston; 
thence 84.5 miles to and including Port Royal Sound; a 
total of 210 miles (See National Ocean Survey Charts 
Nos. 11513, 11521, 11531, 11534, and 11535.) 
Previous projects.For further details see page 613 of 
Annual Report for 1932. 
Existing project. The project provides for a waterway 
twelve feet deep and not less than 90 feet wide with 
a branch channel of the same dimensions to McClellanville 
and construction of three bridges crossing the 
waterway in Horry County, South Carolina. (See table 
at end of chapter for acts authorizing existing project.) 
Local cooperation. Requirements fully satisfied. 
Terminal facilities. There are rail-water terminals 
at Georgetown, Charleston, Johns Island, and Port 
Royal and numerous open-pile wharves mostly for 
shipping agricultural products, fish, oysters, pulpwood, 
wood products, and petroleum products. Marinas are 
located at convenient intervals along the waterway 
where limited supplies and repair facilities are available 
for both commercial vessels and pleasure craft. 
Facilities are considered adequate for existing commerce 
and recreation requirements. 
Operations and results during fiscal year. Maintenance: 
FY 87 cost for contract maintenace dredging 
performed in FY 86 was -$3,706. The mosquito abatement 
control contract costs were $55,196. The cost of 
operating the Snagboat Snell in the Winyah Bay to 
Little River area was $109,540. Costs of $22,000 were 
also incurred for contract dike management. Condition 
and operation studies, natural resource management, 
inspections and reports, real estate, project operations 
management, lands and damages, water control 
management, engineering and design, and supervision 
and administration costs were $491,125. 
Condition at end of fiscal year. Existing project was 
completed in 1940; three bridges were completed in 
1936. Federal costs of existing project to date have been 
$7,345,888 for new work and $45,659,375 for maintenance, 
for a total of $53,005,263. 
3. CHARLESTON HARBOR, S.C. 
Location. The harbor is located on the coast of South 
Carolina about 15 miles south of the midpoint of the 
coastline, 50 miles southwest of Winyah Bay, S.C., and 
80 miles northeast of the mouth of Savannah River. (See 
National Ocean Survey Charts Nos. 11521 and 11524.) 
Previous projects. For further details see page 1808 
of Annual Report for 1915; page 579 of Annual Report 
for 1926; and page 562 of Annual Report for 1938. 
Existing project. The existing project provides for a 
channel 35 feet deep with varying widths from the 
Atlantic Ocean to the mouth of Goose Creek, a total of 
26.3 miles, together with a 35-foot depth by 500-foot 
width channel via Town Creek. Also, a ten foot depth by 
110-foot width channel on the Mount Pleasant side of the 
harbor into Shem Creek to U.S. Highway 17 Bridge, 
and a 30-foot anchorage basin in the lower harbor 
between Castle Pinckney and Fort Moultrie. A 40-foot 
channel estimated to cost $6,060,000 (1960) was 
authorized to be executed when found necessary in the 
interest of national defense from the 40-foot contour in 
Atlantic Ocean to U.S. Naval Base. For further details 
see page 425 of Annual Report for 1962. The project as 
authorized by the 1986 Water Resources Development 
Act provides for deepening of the 35-foot channel to 40 
feet (42 feet in the ocean bar and entrance channel) from 
the 42-foot ocean contour to Goose Creek, a total distance 
of 26.9 miles, construction of one turning basin, 
modification of existing turning basins, deepening and 
modification of the anchorage basin, deepening Shipyard 
River to 38 feet, maintain the Wando River 
channel to 35 feet at federal expense and the deepening 
of this channel to 40 feet if economically justified. (See 
table at end of chapter for acts authorizing existing 
project.) 
Local cooperation. Local interests have fully complied 
with their responsibility to date but are experiencing 
difficulty in securing disposal areas for 
dredged material for continued future maintenance. 
Terminal facilities. Piers and slips extend for about 
one mile along the eastern waterfront of the City of 
Charleston with an additional mile of marginal 
wharves. The South Carolina State Ports Authority 
operates eight piers for fruit, wood, cold storage 
facilities and general cargo, a grain elevator and a beltline 
railway which serves the entire Cooper River 
waterfront. Modern facilities are also at wharves of 
seven major petroleum companies including storage 
tank farms. Modern facilities for marine repairs and 
servicing are available at Detyens Shipyard, located 
approximately ten miles northeast of Charleston on the 
Wando River. The U.S. Navy Department has modern 
facilities for maintenance of naval vessels including 
nuclear-powered submarines. Loading docks and 
storage areas for missile-carrying type vessels have also 
been constructed and are being operated by the U.S. 
7-2

CHARLESTON, SOUTH CAROLINA DISTRICT 
Navy. For further details see Port Series No. 13, 1980, 
Corps of Engineers. 
Operations and results during fiscal year. Maintenance: 
Contract maintenance dredging was performed 
by pipeline dredge during July-September 
1987 in the upper and lower Wando River, removing 
391,591 cubic yards of material. Total FY 87 cost for 
dredging was $800,000. Dike management costs were 
$1,091,558 including the cost of $833 for the Riverine 
Utility Craft operation. The cost of mosquito abatement 
for FY 87 was $75,876. Condition and operation studies, 
water control management, natural resource management, 
inspections and reports, real estate, project 
operations management, lands and damages, engineering 
and design, and supervision and administration 
costs were $956,972. 
Condition at end of fiscal year. Jetties protecting 
the entrance channel across the bar were completed in 
1895. The existing project was completed in October 
1962 except for the national defense portion. Federal 
costs under the existing project to date have been 
$3,328,349 for new work and $93,637,472 for maintenance, 
a total cost of $96,965,821. 
4. COOPER RIVER, CHARLESTON HARBOR, 
S.C. 
Location.Cooper River is located in Charleston and 
Berkeley Counties, S.C., and empties into the Atlantic 
Ocean at Charleston (See National Ocean Survey 
Charts Nos. 11521 and 11524.) 
Existing project. The major cause of the shoaling 
problem in Charleston Harbor was the diversion of 
fresh water from the Santee River through Pinopolis 
Dam into the salt water of Charleston Harbor, which 
caused density currents which traps sediments resulting 
in a phenomenal rate of depostion. The most 
practical solution of the shoaling problem was to divert 
most of the Santee River waters above Pinopolis Dam 
back into the lower Santee River through a canal 
beginning at Lake Moultrie and extending to the Santee 
River in the vicinity of St. Stephen, South Carolina. The 
project for Cooper River as authorized by the 1968 River 
and Harbor Act provided that the discharge through 
the existing Pinopolis Hydroplant be reduced to a flow 
which would not establish a density current in the 
harbor. This flow was estimated at 3,000 cubic feet per 
secon (cfs) during the design phase of the project, but 
after operational tests this flow is estimated at 4,500 cfs. 
The excess water impounded in Lake Moultrie is being 
directed through a new canal above St. Stephen, South 
Carolina, to enter the Santee River at a point well below 
the Lake Marion Spillway (Wilson Dam). A new hydroelectric 
facility was constructed on the new canal at the 
edge of the swamp adjacent to the Santee River. This 
plant replaces those features made less effective at 
Pinopolis through curtailment of flows. The average 
flow of 11,100 cfs at the new powerplant, plus the 4,500 
cfs average release planned for Pinopolis, approximates 
the historical average flow at Pinopolis. The three 
generators at the new plant are rated at 28,000 kilowatts 
each, for a total of 84,000 kilowatts. In the interest 
of fish and wildlife resources of the area, the plan includes 
a herring lift at the new powerhouse site and a 
relocated fish hatchery. 
Estimated cost of the project (1985) is $191,500,000, 
all Federal. (See table at end of chapter for acts 
authorizing existing project.) 
Local cooperation. None required. 
Operations and results during fiscal year. New 
Work: Funds were received for initiation of construction 
during FY 75. Costs during FY 87 were $5,869 for 
lands and damages, $23,890 for the fishlift contract, 
$304,713 for the powerplant, $1,950 for cultural resources, 
and $90,165 for engineering and design and 
supervision and administration. Maintenance: Funds of 
$3,863,929 were spent for maintenance of completed 
work and included $1,991,095 paid to the South 
Carolina Public Service Authority for power losses 
incurred as a result of this project. 
Condition at end of fiscal year. Preconstruction 
planning was completed at the end of FY 74. The 
General Design Memorandum was completed in 
January 1972 and work is proceeding on schedule on 
other phases of the project. Construction was initiated 
March 1977. The project is 99% complete. The poweron-
line date was March 1985. Federal costs for the 
existing project to date have been $189,761,061 for new 
work and $9,650,669 for maintenance, a total of 
$199,411,730. 
5. COOPER RIVER SEISMIC MODIFICATION, 
S.C. 
Location. The Cooper River Seismic Project is 
located in Berkeley County, South Carolina, about 50 
miles north of Charleston, South Carolina. 
Existing project. The Santee-Cooper Project was 
constructed in the early 1940's using the latest state-ofthe-
art design for that time. The project is currently 
licensed by the Federal Energy Regulatory Commission 
(FERC) as project number 199.. FERC requires 
that the project receive independent inspections at least 
once every five years. It was during the 1977 inspection 
that the seismic deficiency of both the West and North 
Dams was noted. This was confirmed again in the 1982 
inspection. As a result of studying the possible consequences 
of the loss of both dams, the S.C. Congressional 
Delegation introduced legislatien which was approved 
in the 1983 Supplemental Appropriation Act to provide 
$2 million for design and $20 million for construction of 
remedial measures. The design and construction 
responsibility was assigned to the U.S. Army Corps of 
Engineers. The Corps began to study various alternatives 
to provide remedial measures for the liquifiable 
foundation of the West Dam in August 1983. 
Current estimated cost of the project is $22,000,000, 
all Federal. 
Local cooperation. None required. 
Condition at end of fiscal year. In September 1987, 
the final design was submitted to FERC for approval 
and is under review. This project will be ready to be 
7-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
advertised in early FY 88.The plans and specifications 
are complete. 
6. FOLLY RIVER, S.C. 
Location. The project begins in Folly River and Folly 
Creek north of the Town of Folly Beach and follows a 
southwesterly course into the Atlantic Ocean. (See 
National Ocean Survey Chart No. 11521.) 
Existing project. The project provides: an entrance 
channel, eleven feet deep by 100 feet wide extending 
from the Stono River one mile through the ocean bar; a 
channel within Folly River nine feet deep and 80 feet 
wide, extending three miles downstream from U.S. 
Highway 171 to the confluence of Folly and Stono 
Rivers; and a channel within Folly Creek nine feet deep 
by 80 feet wide, extending three miles downstream 
from Highway 171 to the confluence with Folly River. 
Local cooperation. Requirements fully satisfied. 
Operations and results during fiscal year. Maintenance: 
Maintenance dredging was performed (a) in 
the entrance bar by the sidecaster dredge, Fry, removing 
36,709 cubic yards at a cost of $131,983, (b) in 
Folly River during August-September 1987 removing 
40,374 cubic yards at a cost of $131,174. Condition and 
operations studies, water control management, inspections 
and reports, project operations management, 
engineering and design, and supervision and administration 
costs were $80,523. 
Condition at end of fiscal year. The existing project 
was completed in FY 1979. Federal costs for the existing 
project to date have been $337,736 for new work and 
$1,514,159 for maintenance, a total of $1,851,895. 
7. GEORGETOWN HARBOR, S.C. 
Location. The harbor is located on the coast of South 
Carolina 50 miles northeast of Charleston Harbor and 
90 miles southwest of the entrance to Cape Fear River, 
North Carolina. (See National Ocean Survey Chart No. 
11532.) 
Previous projects. For further details see page 1806 
of Annual Report for 1915; page 549 of Annual Report 
for 1938; and page 442 of Annual Report for 1944. 
Existing project. The authorizations provide for a 
channel 27 feet deep with varying widths of 600 feet to 
400 feet from the Atlantic Ocean to and including a 
turning basin at the U.S. Highway 17 bridge over 
Sampit River, with a side channel 2,400 feet long and 
not less than 200 feet wide leading to a turning basin at 
the upper end of the built-up portion of the city waterfront, 
a total of 17.9 miles. The project also provides for 
the continued maintenance to a depth of 18 feet and a 
width of 400 feet for the bypassed portion of Sampit 
River opposite the City of Georgetown. (See table at end 
of chapter for acts authorizing existing project.) 
Local cooperation. Fully satisfied. 
Terminal facilities. Terminal facilities at the Port of 
Georgetown, suitable for oceangoing vessels, consist of 
one marginal concrete pier and one of creosoted-timber 
construction. For intracoastal waterway traffic there 
are a number of smaller wharves and landings along 
the Georgetown waterfront on the old channel. For 
further details, see Port Series No. 13, 1980, Corps of 
Engineers. 
Operations and results during fiscal year. Maintenance: 
Maintenance dredging was performed (a) in 
the Sampit River during September 1986-January 
1987, removing a total of 1,341,300 cubic yards of 
material in FY 87 at a cost of $354,546, (b) in upper 
Winyah Bay from May 1987-September 1987 removing 
425,373 cubic yards of material at a cost of $782,454, (c) 
in Georgetown entrance channel from August 1987- 
September 1987 removing 648,183 cubic yards of 
material at a cost of $1,275,000, and (d) costs of $100,000 
were incurred for dredging an estimated 50,000 cubic 
yards in Sampit River. Contract dike management 
costs were $271,500 and mosquito abatement costs were 
$8,010. Water control management, natural resources 
management, condition and operation studies, inspections 
and reports, project operations management, 
income credits to operations, funds returned to the US 
Treasury by CE, engineering and design and supervision 
and administration costs were $450,388. 
Condition at end of fiscal year. The existing project 
was completed in 1951. The jetties were completed in 
1903-1904. Federal costs for the existing project to date 
have been $4,615,903 for new work and $46,073,165 for 
maintenance, a total of $50,689,068. 
8. JEREMY CREEK, S.C. 
Location. Jeremy Creek is located at McClellanville, 
S.C. approximately 40 miles northeast of Charleston 
and 20 miles southwest of Georgetown. (See National 
Ocean Survey Charts Nos. 11531 and 11518. 
Existing project. The dredging of Jeremy Creek or 
"Side Channel to McClellanville" was authorized as a 
part of the channel from Charleston to McClellanville 
(or part of what is now the Atlantic Intracoastal Waterway) 
by the River and Harbor Act of 2 March 1907 and 
provided for a waterway twelve feet deep at mean low 
water and a width of not less than 90 feet. A turning 
basin twelve feet deep and 150 feet in diameter was 
authorized 11 January 1982. 
Local cooperation. Local requirements have been 
met by the S.C. Coastal Council. 
Terminal facilities. There are three shrimping 
facilities, one oyster packing shed, a crabbing operation, 
an icehouse, a fuel dock and a public launching 
ramp located on Jeremy Creek. The commercial 
facilities are privately owned, but are open to all on an 
equal basis. The existing facilities are considered adequate 
for present and near future commerce. There are 
areas along the east bluff shore available for the expansion 
of existing facilities or the construction of new 
ones. 
Operations and results during fiscal year. 
Engineering and design costs were $4,073. 
Condition at end of fiscal year. Federal costs of 
existing project to date have been $49,987 for new work 
and $7,073 for maintenance, a total of $57,060. 
7-4

CHARLESTON, SOUTH CAROLINA DISTRICT 
9. LITTLE RIVER INLET, N.C. AND S.C. 
Location. The project is located near the North 
Carolina-South Carolina state line. Little River enters 
the Atlantic Ocean at Little River Inlet at the state line 
and affords the only connection between the Atlantic 
Intracoastal Waterway and the ocean along 68 miles of 
coastline from Shallotte, N.C. to Georgetown, S.C. (See 
National Ocean Survey Chart No. 11535.) 
Existing project. The project provides for an entrance 
channel twelve by 300 feet across the ocean bar; 
thence a ten by 90-foot inner channel to the Atlantic Intracoastal 
Waterway. The entrance channel is stabilized 
by jetties extending seaward 3,200 feet and 3,000 
feet long on the north and south sides of the inlet, 
respectively. 
Emergency dredging on an annual basis was 
authorized by the Water Resources Act of 1974. Previous 
work was done under the authority of the River 
and Harbor Act of 1945, Section 3, P.L. 79-14. 
Local cooperation. Requirements fully satisfied. 
Terminal facilities. There are eight marinas, 
numerous private docks, and several public boat ramps 
located in or near Little River. It is expected that 
existing facilities will expand and new ones will be 
added as demands for services exceed current capacity. 
Operations and results during fiscal year. New 
Work: None. Maintenance: A 5-year monitoring program 
was initiated in 1981 to provide information for 
management of the project and to determine the effect 
of the project on nearby coastal areas. Charleston District 
(SAC) collects the data and Coastal Engineering 
Research Center (CERC) performs data analysis and 
interpretation. Following conclusion of the initial fiveyear 
monitoring plan (February 1986), CERC presented 
results of their preliminary analysis to SAC and 
South Atlantic Division at a meeting in Charleston on 
8 April 1986. The data indicated that coastal processes 
in the vicinity of the inlet have not reached an equilibrium 
condition and recommended continued monitoring 
at a reduced level. Condition and operation studies, 
water control management, inspections and reports, 
project operations management, and supervision and 
administration costs were $55,353. 
Condition at end of fiscal year. The initial construction 
contract was awarded 14 January 1981. The 
project was completed in FY 1984. Federal costs for the 
existing project were $17,037,428 for new work and 
$2,276,569 for maintenance, a total of $19,313,997. 
10. MURRELLS INLET, S.C. 
Location. The project is located on the coast of South 
Carolina, in Georgetown County, about 13 miles southwest 
of the City of Myrtle Beach. The inlet is the ocean 
entrance through a barrier beach to several tidal 
streams in the Murrells Inlet-Garden City estuarine 
area. (See National Ocean Survey Chart No. 11535.) 
Existing project. The project provides for an entrance 
channel twelve by 300 feet across the seaward 
bar; thence a ten by 90-foot inner channel to a turning 
basin at the old Army crashboat dock. The entrance 
channel will be stabilized by ocean jetties extending 
seaward 3,445 feet and 3,319 feet on the north and south 
sides of the inlet, respectively. The recreational project 
includes a walkway on the south jetty with access road 
and parking area. Emergency dredging on an annual 
basis was authorized by the Water Resources Act of 
1974. Previous work was done under the authority of 
the River and Harbor Act of 1945, Section 3, P.L. 79-14. 
Local cooperation. Requirements fully met. 
Terminal facilities. There are five marinas and 
numerous private docks located about the Murrells 
Inlet Harbor. There are several public boat ramps in 
the area. Facilities are expected to be expanded and 
new ones added as demands for services outstrip 
capacity. 
Operations and results during fiscal year. New 
Work: Costs of $342 were incurred. Maintenance: No 
maintenance dredging performed. A monitoring program 
was initiated in April 1978 to provide site specific 
information for proper management of the project and 
to provide data on coastal response to the project. 
Charleston District collects most of the data and Coastal 
Engineering Research Center (CERC) performs data 
analysis and interpretation. The monitoring program 
has been adjusted several times based on CERC's 
recommendations. Currently the program includes 
daily littoral environmental observations (LEO), annual 
aerial photography, jetty surveys and site inspections, 
semi-annual surveys of beaches and the 
deposition basis. Channel surveys are not scheduled but 
are conducted on an "as needed" basis. 
Results of the monitoring program have led to 
recommendations for dredging the deposition basin, 
nourishment of a reach of eroded beach at North Litchfield 
Beach and erosion protection of a section of the 
south jetty sand dike. This maintenance work is 
scheduled for completion during FY 1988. Natural 
resource management, inspections and reports, project 
operations management, condition and operation 
studies, water control management costs and engineering 
and design, supervision and administration costs 
were $125,715. 
Condition at end of fiscal year. The existing project 
was completed in 1981. Federal costs for the existing 
project to date have been $13,407,465 for new work and 
$1,214,485 for maintenance, a total of $14,621,950. 
11. PORT ROYAL HARBOR, S.C. 
Location. The harbor is located on the coast of South 
Carolina 47 miles southwest of Charleston Harbor and 
23 miles northeast of Savannah River, Georgia. (See 
National Ocean Survey Chart No. 11516.) 
Existing project. The authorized project provides 
for a channel from the ocean through Port Royal Sound 
to Port Royal, South Carolina, 27 feet deep and 500 feet 
wide across the ocean bar and in Port Royal Sound for 
approximately 12.7 miles, thence 24 feet deep and 300 
feet wide in Beaufort River and Battery Creek for approximately 
8.3 miles to and including a turning basin 
7-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
27 feet deep and 600 feet wide opposite the wharf of the 
South Carolina State Ports Authority. (See the table at 
the end of the chapter for acts authorizing the existing 
project.) 
Local cooperation. Requirements fully satisfied. 
Terminal facilities. The South Carolina State Ports 
Authority constructed a marginal concrete wharf and 
operates modern terminal facilities which are considered 
adequate for present commerce of the port. 
Operations and results during fiscal year. Maintenance: 
Cost incurred in FY 87 for dredging accomplished 
in FY 86 is $-5,400. Natural resource management, 
condition and operation studies, water quality 
management, inspections and reports, and project 
operation management, engineering and design and 
supervision and administration costs were $56,785. 
Condition at end of fiscal year. The existing project 
was completed in 1959. Federal costs for the existing 
project to date have been $1,786,100 for new work and 
$6,857,793 for maintenance, a total of $8,643,893. 
12. SHIPYARD RIVER, S.C. 
Location. This waterway is a tidal tributary of 
Charleston Harbor, South Carolina. It has its source 
about one-half mile below the U.S. Naval Base, whence 
it flows southerly about three miles and empties into the 
Cooper River about three-fourths miles above Drum 
Island. (See National Ocean Survey Chart No. 11524.) 
Previous projects. For details, see page 610 of 
Annual Report for 1932 and page 463 of Annual Report 
for 1944. 
Existing project. The authorized project provides 
for a channel 30 feet deep from Cooper River to 
Macalloy Corporation's plant, including two turning 
basins, one opposite Gulf Oil Corporation Terminal and 
another at the upper end of project. (See table at end of 
chapter for acts authorizing existing project.) 
Local cooperation. Requirements fully satisfied. 
Terminal facilities. In the lower three-quarters of a 
mile of the channel are large marginal wharves of the 
Gulf Oil Corporation and Shipyard River Terminal 
Company. These wharves accommodate deep-draft, 
oceangoing vessels for handling petroleum products, 
coal and fertilizer materials. In the upper channel is 
Macalloy Corporation's wharf for handling ores. For 
further details see Port Series No. 13, 1980, Corps of 
Engineers. 
Operations and results during fiscal year. Maintenance: 
Condition and operations studies, water control 
management, inspections and reports, project 
operations management, supervision and administration, 
and engineering and design costs were $32,891. 
Condition at end of fiscal year. The existing project 
was completed in 1951. Federal costs under the existing 
project to date have been $487,824 for new work and 
$8,920,275 for maintenance for a total of $9,408,099. 
13. TOWN CREEK, S.C. 
Location. Town Creek Channel begins at the AIWW 
directly south of the Town of McClellanville in Charleston 
County, S.C. The channel follows Five Fathom 
Creek in a southerly direction to the Atlantic Ocean. 
(See National Ocean Survey Chart No. 11531.) 
Existing project. The project provides a channel ten 
feet deep by 80 feet wide from the AIWW to the mouth 
of Five Fathom Creek, a distance of 6.2 miles. The project 
includes an entrance channel twelve feet deep by 
100 feet wide across the ocean bar, a distance of 4.0 
miles. (See table at end of chapter for acts authorizing 
existing projects.) 
Local cooperation. Requirements fully satisfied. 
Operations and results during fiscal year. Maintenance: 
Maintenance dredging performed by the sidecaster 
dredge Schweizer resulted in costs of $375,845. 
Condition and operations studies, water control 
management, project operations management, engineering 
and design, supervision and administration 
costs were $59,777. 
Condition at end of fiscal year. The existing project 
was completed in 1975. Federal costs under the existing 
project to date have been $219,521 for new work and 
$2,650,016 for maintenance, a total of $2,869,537. 
14. RECONNAISSANCE AND CONDITION 
SURVEYS 
Costs of $29,138 were incurred for condition surveys 
on Adams Creek, S.C., Ashley River, S.C., Village 
Creek, S.C. and Waccamaw River, S.C. & N.C. 
15. OTHER AUTHORIZED NAVIGATION 
REPORTS 
(See Table 7-C.) 
16. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION 
Navigation Work Under Special Authorization Pursuant 
to Section 107, Public Law 86-645, as amended 
(Preauthorization) and Section III, Public Law 90-433, 
as amended. (See Table 7-D.) 
Snagging and clearing for navigation (Sec. 3 of 1934 
River and Harbor Act, Public Law 14, 79th Congress.) 
None. 
Beach Erosion 
17. OTHER AUTHORIZED BEACH EROSION 
CONTROL PROJECTS 
(See Table 7-E.) 
18. BEACH EROSION WORK UNDER 
SPECIAL AUTHORIZATION 
Beach erosion control activities pursuant to Section 
103, 1960 River & Harbor Act, as amended, consisted of 
7-6

CHARLESTON, SOUTH CAROLINA DISTRICT 
one reconnaissance study on Pawleys Island, S.C. FY 
1987 costs on this study were $9,003. 
Flood Control 
19. COOPER ISLAND, POMPION HILL 
CHAPEL, S.C. 
Location. This project is located entirely within 
Berkeley County, South Carolina near the City of 
Charleston. 
Existing project. The authorized project consists of 
bank stabilization of approximately 200 feet of bank on 
the East Branch of the Cooper River. The project is 
adjacent to the Pompion Hill Chapel. The project was 
authorized on 23 July 1986 under general authorities 
contained in Section 14 of the 1946 Flood Control Act, as 
amended. 
Local cooperation. Requirements fully satisfied. 
Operations and results during fiscal year. A contract 
was awarded on 24 September 1986 and was completed 
on 11 January 1987. Costs for work completed in 
association with this project were $196,506. 
Condition at the end of the fiscal year. The project 
has been turned over to the sponsor for operation and 
maintenance. Total cost of this project to date is 
$211,100. 
20. SCOTTS CREEK, S.C. 
Location. Scotts Creek is located entirely within the 
limits of Newberry County, South Carolina. The 
authorized project is located within the corporate limits 
of the City of Newberry, South Carolina. 
Existing project. The authorized project consists of 
channel excavation and bank stabilization of 1.05 miles 
of the creek. The project extends from approximately 
500 feet downstream of the crossing of O'Neal Street to 
the crossing of Nance Street. The project was 
authorized on 14 November 1975 under general 
authorities contained in Section 205 of the 1948 Flood 
Control Act, as amended. 
Local cooperation. Local interests must provide 
lands, easements, rights-of-way, utility relocations of 
highway bridge alterations necessary for construction; 
hold and save the United States free from damages; 
maintain and operate the project after completion; prevent 
future encroachments; notify affected interests 
annually that improvements will not provide complete 
flood protection; and prevent unwise future flood plain 
development. 
Operations and results during fiscal year. The construction 
contract for the project awarded on 14 May 
1986 was completed 25 July 1987. This work consisted 
of channel improvements. Costs for FY 87 were 
$425,138. 
Condition at the end of fiscal year. The project has 
been completed and will be turned over to the sponsor 
for operation and maintenance. The construction contract 
is being held open until the establishment of 
acceptable stands of turf and shrubs is verified. 
21. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
To determine the extent of compliance with approved 
regulations for maintenance and operation, inspections 
were made of the following projects during the period: 
Eagle Creek, Sawmill Branch, Cow Castle Creek, Cowpens 
Swamp, Crabtree Swamp, Gapway Swamp, 
Simpson Creek, Todd Swamp, Buck Creek, Edisto 
River, Shot Pouch Creek, Turkey Creek, Kingstree 
Branch, and Wilson Branch. All projects are located 
primarily in South Carolina. Responsible local officials 
were advised of inadequacies in maintenance and 
operation on local flood protection works when 
appropriate. Cost for the period was $32,380. 
22. OTHER AUTHORIZED FLOOD CONTROL 
PROJECTS 
(See Table 7-F.) 
23. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood Control Activities Pursuant to Section 205, 
Public Law 858, 80th Congress, as amended (Preauthorization). 
(See Table 7-G). 
Emergency Flood Control Activities - Repair, Flood 
Fighting and Rescue Work (Public Law 99, 84th 
Congress, and Antecedent Legislation). 
(See Table 7-G). 
Federal costs for FY 1987 were $139,082 for Flood 
Control and Coastal Emergencies and $119,277 for the 
National Emergency Preparedness Program. 
Miscellaneous 
24. STREAMBANK EROSION UNDER 
SPECIAL AUTHORIZATION 
The only streambank erosion activity pursuant to 
Section 14 of the 1946 Flood Control Act (as amended) 
was Atlantic Intracoastal Waterway (AIWW), Myrtle 
Beach Wastewater Treatment Facility, S.C. FY 1987 
costs for this project were $21,589. 
General Investigations 
25. ACTIVE INVESTIGATIONS 
See Table 7-H which covers: Surveys, Collections, and 
Study of Basic Data, and Research and Development 
Activities. 
7-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 7-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
1 Aquatic Plant 
Control, SC 
(Regular Funds) 
(Contributed Funds) 
2 Atlantic Intracoastal 
Waterway 
Between Norfolk, 
Va. and the St. 
Johns River, FL 
3 Charleston Harbor, 
SC 
4 Cooper River, 
Charleston Harbor, 
SC 
5 Cooper River Seismic 
Modification, SC 
6 Folly River, SC 
7 Georgetown Harbor, 
SC 
8 Jeremy Creek, SC 
9 Little River Inlet, 
SC and NC 
(Regular Funds) 
(Contributed Funds) 
New Work: 
Approp. 
Cost 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
196,000 
193,631
00 
0
0O 
2,055,000 
2,099,453
00 
4,796,500 
6,994,476 
11,270,000 
11,657,195 
480,000 
511,898 
1,300,000 
1,174,744
00 
00 
110,000 
250,173
00 
1,945,000 
2,495,612 
331,000 
863,027 
-180,000 
344,186
0 
140,000 
658,000 
657,623
00 
00 
3,224,700 
3,251,183
00 
5,366,000 
5,201,014 
12,910,000 
11,336,085 
2,556,000 
1,839,765 
900,000 
894,513
00 
00 
259,000 
257,359
0
0 
1,796,500 
1,814,224
0 
-29,255 
78,552 
124,428 
31,920 
31,927 
638,000 
585,625
00 
00 
3,024,000 
3,080,530
00 
4,476,000 
4,575,020 
4,700,000 
5,804,764 
2,948,000 
3,349,732 
198,00 
233,086
00 
00 
334,000 
325,791
0
0 
3,242,000 
3,263,966
00 
00 
-33,000 
437 
87,000 
94,771
00 
566,000 
602,643
00 
00 
754,000 
674,155
00 
2,831,000 
2,924,406
0 
426,587 
3,572,000 
3,863,929 
745,000 
749,898
00 
00 
328,000 
343,680
00 
3,544,000 
3,241,898
0
0 
5,000 
4,073
00 
52,000 
55,353
00 
2,733,605 
2,715,092 
52,028 
52,028 
7,455,378'/ 
7,455,3781/ 
45,846,0042/ 
45,728,7972/ 
10,165,564$/ 
10,165,564/ 
94,111,587'/ 
94,039,461'/ 
191,482,583 
189,761,061 
9,851,000 
9,650,669 
3,243,000 
3,091,816
00 
337,736 
337,736 
1,516,000 
1,514,159 
7,061,755/ 
7,061,755/ 
46,537,7806/ 
46,187,7216/ 
49,987 
49,987 
8,000 
7,073 
17,037,428 
17,037,428 
2,277,676 
2,276,569 
1,521,920 
1,521,920 
7-8

CHARLESTON, S.C. DISTRICT 
TABLE 7-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
10 Murrells Inlet, SC New Work: 
(Regular Funds) Approp. 0 0 0 0 13,419,240 
Cost 12,758 4,127 -24 342 13,407,465 
(Contributed Funds) Approp. 0 0 0 0 1,380,000 
Cost 104,225 0 0 0 1,379,148 
Maint: 
Approp. 0 78,000 107,600 118,100 1,284,2697/ 
Cost 38,647 83,886 103,438 125,715 1,281,4857/ 
11 Port Royal Harbor, New Work: 
SC Approp. 0 0 0 0 1,786,100 
Cost 0 0 0 0 1,786,100 
Maint: 
Approp. 0 8,000 892,000 52,000 6,858,408 
Cost 0 3,814 896,186 51,385 6,857,793 
12 Shipyard River, New Work: 
SC Approp. 0 0 0 0 491,9748/ 
Cost 0 0 0 0 491,9748/ 
Maint: 
Approp. 15,000 691,000 106,000 34,500 8,926,692 
Cost 420,227 707,639 107,700 32,891 8,920,275 
13 Town Creek, SC New Work: 
(Regular Funds) Approp. 0 0 0 0 219,521 
Cost 0 0 0 0 219,521 
(Contributed Funds) Approp. 0 0 0 0 8,600 
Cost 0 0 0 0 8,600 
Maint: 
Approp. 345,000 178,000 325,000 422,000 2,651,000 
Cost 420,739 -2,201 525,242 435,622 2,650,016 
19 Cooper River, Pompion New Work: 
Hill Chapel, SC Approp. 0 0 46,100 165,000 211,100 
Cost 0 0 14,594 196,506 211,100 
20 Scott's Creek, SC New Work: 
Approp. 0 0 326,000 219,000 545,000 
Cost 0 0 114,511 425,138 539,649 
1/ Includes $109,490 for new work for previous project. 
Z/Includes $69,422 for maintenance of previous projects. 
/Includes $6,586,455 for previous projects. $3,328,349 for the 
existing project, and $250,760 for Phase I to deepen harbor. 
4/ Includes $401,989 for maintenance of previous projects. In 
addition, $600 for maintenance expended from contributed 
funds. 
5/ Includes $2,445,852 for new work for previous projects. 
6/ Includes $114,556 for maintenance of previous projects. 
7/ Includes $67,000 accomplished under authority of Section 3, 
P. L. 79-11 incurred through FY 73. 
8/ Includes $4,150 for new work on previous projects. 
7-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 7-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
R&H Act of Oct. 27, 1965 
R&H Act of Sep. 19, 1890 
R&H Act of June 13, 1902 
R&H Act of Mar. 2, 1907 
R&H Act of Mar. 2, 1907 
R&H Act of Mar. 3, 1925 
R&H Act of Mar. 3, 1925 
R&H Act of July 3, 1930 
R&H Act of Aug. 30, 19351 
R&H Act of Aug. 30, 19352 
R&H Act of Aug. 30, 19352 
R&H Act of Aug. 26, 1937 
R&H Act of Mar. 2, 1945 
R&H Act of June 18, 1878 
R&H Act of Aug. 8, 1917 
R&H Act of July 18, 1918 
R&H Act of Jan. 21, 1927 
R&H Act of Oct. 17, 1940 
R&H Act of Mar. 2, 1945 
R&H Act of Sep. 3, 1945 
R&H Act of July 14, 1960 
AQUATIC PLANT CONTROL, SC 
(See Section 1 of text.) 
Provides for control and progressive eradication of 
water hyacinth, alligatorweed, Eurasian water-milfoil 
and other obnoxious acquatic plant growths from 
navigable waters, tributary streams, connecting 
channels, and other allied waters of the U.S., in combined 
interest of navigation, flood control, drainage, 
agriculture, fish and wildlife conservation, public 
health and related purposes, including continued research 
for development of most effective and economic 
control measures in cooperation with other Federal and 
state agencies. 
ATLANTIC INTRACOASTAL WATERWAY BETWEEN 
NORFOLK, VA., AND ST. JOHNS 
RIVER, FL. 
(See Section 2 of text.) 
Channel from Minim Creek to Winyah Bay. 
Channel from Charleston to a point opposite 
McClellanville. 
Branch channel to McClellanville. 
Extending the channel to Minim Creek, thence through 
the Esterville-Minim Canal to Winyah Bay. 
Cut across the Santee Delta at Four Mile Creek. 
Widening and deepening the waterway from Charleston 
to Beaufort. 
A waterway eight feet deep and 75 feet wide from Cape 
Fear River to Winyah Bay. 
Construction of bridges across the waterway in Horry 
County, S.C. 
Cutoff between Ashepoo and Coosaw Rivers. 
Enlarging the channel from Winyah Bay to Charleston 
including the branch channel to McClellanville, to 
depth of ten feet and bottom width of 90 feet. 
Increasing dimensions of waterway to twelve feet deep 
and 90 feet wide. 
Anchorage Basin 125 feet wide, 335 feet long, twelve 
feet deep, near Myrtle Beach, S.C.4 
(Deauthorized by 1986 WRDA) 
CHARLESTON HARBOR, S.C. 
(See Section 3 of text.) 
2 jetties.5 
Increase in depth to 30 feet with width of 500 feet 
between the jetties and 1,000 feet seaward thereof. 
The 40-foot channel to the Naval Base. 
Act provided that the 40-foot channel should not be 
undertaken "until the proposed new drydocks at this 
navy yard, carrying a depth of 40 feet of water over the 
blocks, has been authorized." This dock was authorized 
in the Naval Appropriations Act approved July 1, 1918 
(40 Stat. L. 725). 
A 30-foot channel from the sea to Goose Creek via Cooper 
River, together with a 30-foot channel through Town 
Creek for commercial purposes. The act also provided 
that the 40-foot channel be prosecuted only as found 
necessary for national defense. 
The 35-foot channel depth from the sea to the head of the 
project via Cooper River and Town Creek, also a channel 
in Shem Creek to Mount Pleasant, 110 feet wide and ten 
feet deep, including a turning basin at the upper end. 
An anchorage area 30 feet deep in the water area 
between Castle Pinckney and Fort Moultrie. 6 
(Deauthorized by 1986 WRDA) 
Deepen the 30-foot channel north and east of Drum 
Island to 35 feet. 
Shem Creek Channel modified by extending 1,150 feet 
upstream and downstream from mouth to Atlantic 
Intracoastal Waterway. 
Sec. 302, 1965 Rivers and Harbors 
Act (H.D. 251, 89th Cong., 1st Sess.) 
Annual Report, 1889, p. 1184. 
H.D. 84, 56th Cong., 1st sess. 
and Annual Report 1900, p. 1908 
Annual Report 1903, p. 1133. 
H.D. 178, 63rd Cong., 1st sess. 
H.D. 237, 68th Cong., 1st sess. 
S.D. 178, 68th Cong., 2nd sess. 
H.D. 41, 71st Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 14, 72nd Cong., 1st sess. 
H.D. 129, 72nd Cong., 1st sess. 
Rivers and Harbors Committee, 
Doc. 11, 72nd Cong., 1st sess. 
Rivers and Harbors Committee, 
Doc. 6, 75th Cong., 1st sess.3 
H.D. 327, 76th Cong., 1st sess. 
Annual Report 1878, pp. 553-572. 
H.D. 288, 62nd Cong., 2nd sess. 
H.D. 1946, 64th Cong., 2nd sess., 
pt. 1, pp. 21-29, 57, 58, and 61-63. 
H.D. 249, 69th Cong., 1st sess. 
H.D. 259, 76th Cong., 1st sess. 
H.D. 156, 77th Cong., 1st sess. 
S.D. 136, 83rd Cong., 2nd sess.3 
H.D. 35, 86th Cong., 1st sess. 
7-10

TABLE 7-B 
CHARLESTON, SOUTH CAROLINA DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Water Resources Development 
Act of Oct. 22, 1976 
Water Resources Development 
Act of 17 Nov. 1986 
R&H Act of Aug. 13, 1968 
Authorized by Chief of Engrs. 
on Dec. 23, 1977 under 
authority of Section 107 R&H 
Act of 1960, as amended. 
R&H Act of Aug. 5, 1886 
R&H Act of June 25, 1910 
R&H Act of Mar. 2, 1945 
R&H Act of June 30, 1948 
R&H Act of Mar. 2, 1907 
Authorized by Chief of Engrs. 
on 11 Jan 1982 under 
authority of Section 107 R&H 
Act of 1960, as amended. 
R&H Act of 1945, Sec. 3 
Auth. by Senate Public Works 
Comm. and the House Public 
Works Comm. on Oct. 12, 1972, 
under auth. of Sec. 201, P.L. 
89-298, 1965 FC Act. 
Water Resources Development 
Act of 1974. 
Project is authorized for the Phase I design 
memorandum stage of Advanced Engineering and 
Design. 
Deepening 35 foot channel to 40 feet (42 feet in the ocean 
bar and entrance channel) from the 42 foot ocean 
contour to Goose Creek, a distance of 26.9 miles, 
construction of one turning basin, modification of 
existing turning basins, deepening and modification of 
the anchorage basin, deepening Shipyard River to 38 
feet, maintain the Wando River Channel to 35 feet at 
Federal expense and the deepening of this channel to 
40 feet if economically justified. 
COOPER RIVER, CHARLESTON, S.C. 
(ST. STEPHEN PROJECT) 
(See Section 4 of text.) 
Redivert most of the Santee River waters above 
Pinopolis Dam into the Lower Santee River through a 
canal beginning at Lake Moultrie and extending to the 
Santee River in the vicinity of St. Stephen, South 
Carolina. 
COOPER RIVER SEISMIC MODIFICATION, 
S.C. 
(See Section 5 of text.) 
Install a closure structure in the diversion canal 
between Lake Marion and Lake Moultrie and construct 
such measures as necessary to improve the seismic 
stability of the Pinopolis West Dam on the Cooper River. 
FOLLY RIVER, S.C. 
(See Section 6 of text.) 
Consists of stable all-tide channel nine feet deep and 80 
feet wide in Folly River and an entrance channel at 
Stono Inlet 100 feet wide and eleven feet deep. 
GEORGETOWN HARBOR, S.C. 
(See Section 7 of text.) 
Jetties and earthen dike to protect south jetty. 
Previous project channel dimensions and training wall. 
27-foot channel from ocean, including a turning basin 
in Sampit River. 
Cutoff and side channel in Sampit River. 
JEREMY CREEK, S.C. 
(See Section 8 of text.) 
To provide a waterway twelve feet deep at mean low 
water and a width of not less than 90 feet. 
Turning basin twelve feet deep with a diameter 
of 150 feet. 
LITTLE RIVER INLET, N.C. AND S.C. 
(See Section 9 of text.) 
Provides for an entrance channel twelve feet by 300 feet 
across the ocean bar; thence ten feet by 90-foot inner 
channel to the Atlantic Intracoastal Waterway. 
Authorized emergency dredging operations as the Chief 
of Engineers determines necessary to maintain channel 
depths sufficient to permit free and safe movement of 
vessels until such time as the authorized project is 
constructed. 
7-11 
H.D. 436, 94th Cong., 2nd sess. 
H.D. 99-1013, 99th Cong., 2nd sess., 
P.L. 99-662. 
Rivers and Harbors Act of 1968, 
S.D. 88, 90th Cong. 
H.D. 3069, 98th Cong., 1st sess. 
Detailed Project Report 
H.Ex. Doc. 258 48th Cong., 2nd 
sess., and Annual Report 1885, pp. 
1154-1170, and H. Ex. Doc. 117, 
50th Cong., 2nd sess., and Annual 
Report 1889, pp. 1110-1111. 
H.D. 395, 58th Cong., 2nd sess. and 
Annual Report 1904, pp. 1591-1605. 
H.D. 211, 76th Cong., 1st sess. 
H.D. 21, 81st Cong., 1st sess. 
Annual Report 1903, p. 1133. 
Detailed Project Report 
P.L. 79-14 
H.D. 362, 92nd Cong. 
H.D. 10203, 93rd Cong., 2nd sess.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 7-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
R&H Act of 1945, Sec. 3 
Auth. by the House Committee 
on Public Works on Nov. 10, 
1971 and the Senate Committee 
on Public Works on 
Nov. 18, P.L. 89-298, 1965 FC 
Act. 
Water Resources Development 
Act of 1974. 
R&H Act of Sept. 3, 1954 
R&H Act of July 25, 1912 
R&H Act of Mar. 3, 1925 
R&H Act of July 3, 1930 
R&H Act of Aug. 30, 1935 
R&H Act of Aug. 26, 19372 
R&H Act of Mar. 2, 1945 
Auth. by Chief of Engrs. on 
Feb. 12, 1974 under Auth. of 
Sec. 107 of R&H Act of 1960, 
as amended. 
Auth. under Sect. 14 of the 
1946 Flood Control Act, as 
amended. 
Auth. under Sect. 205 of the 
1948 Flood Control Act, as 
amended. 
MURRELLS INLET, S.C. 
(See Section 10 of text.) 
Provides for an entrance channel twelve feet by 300 feet 
across the seaward bar, thence ten by 90-foot inner 
channel to a turning basin at the old Army crash boat 
dock. 
Authorized emergency dredging operations as the Chief 
of Engineers determines necessary to maintain channel 
depths sufficient to permit free and safe movement of 
vessels until such time as the authorized project is 
constructed. 
PORT ROYAL HARBOR, S.C. 
(See Section 11 of text.) 
A channel from the ocean through Port Royal Sound to 
Port Royal, S.C.; 27 feet deep and 500 feet wide across 
the ocean bar and in Port Royal Sound for approximately 
12.7 miles; thence 24 feet deep and 300 feet wide in 
Beaufort River and Battery Creek for approximately 
8.3 miles to and including a turning basin 27 feet deep 
and 600 feet wide opposite wharf of the S.C. State Ports 
Authority. 
SHIPYARD RIVER, S.C. 
(See Section 12 of text.) 
Channel depth of 15 feet and width of 100 feet. 
Deepening of channel to 18 feet from deep water in 
Cooper River upstream 1-1/16 miles. 
Channel depths of twelve to twenty feet. 
28-feet from Cooper River to Gulf Oil Corp's terminal, 
and the deepening of the channel above that point to 
twenty feet from the depth of twelve feet previously 
authorized without loval cooperation. 
Enlargement of the channel to a depth of 30 feet and a 
width of 200 feet up to the Gulf Oil Corp's terminal, 
with a turning basin 30 feet deep at the latter point. 
Extension of the existing 30-foot channel to vicinity of 
the Pittsburg Metallurgical Co. Plant, with a turning 
basin at the upper end. 
TOWN CREEK, S.C. 
(See Section 13 of text.) 
An entrance channel twelve feet deep by 100 feet wide 
across the ocean bar a distance of 4.0 miles and a channel 
ten feet deep by 80 feet wide from the mouth of Five 
Fathom Creek to the Atlantic Intracoastal Waterway, a 
distance of 6.2 miles. 
COOPER RIVER, POMPION HILL CHAPEL, S.C. 
(See Section 19 of text.) 
Provides for bank protection of the Pompion Hill 
Chapel. 
SCOTTS CREEK, S.C. 
(See Section 18 of text.) 
Provides for clearing and channel excavation of 1.05 
miles of channel. 
P.L. 79-14 
H.D. 137, 92nd Cong. 
H.D. 10203, 93rd Cong., 2nd sess. 
Rivers and Harbors Act, H.D. 469, 
81st Cong., 2nd sess. 
S.D. 350, 62nd Cong., 2nd sess. 
H.D. 288, 68th Cong., 1st sess. 
Rivers & Harbors Committee Doc. 
Rivers & Harbors Committee 
Doc. 43, 73rd Cong., 2nd sess. 
Rivers & Harbors Committee 
Doc. 38, 75th Cong., 1st sess. 
H.D. 93, 79th Cong., 1st sess. 
Detailed Project Report. 
Letter Report. 
Detailed Project Report. 
1/ Included in Public Works Administration Program September 
6, 1933. 
/ Included in Emergency Relief Administration Program 
May 28, 1935. 
3/ Contains latest published maps. 
4/ Inactive. 
5/ Completed under previous projects. 
6/ For national defense. 
7-12

CHARLESTON, SOUTH CAROLINA DISTRICT 
OTHER AUTHORIZED NAVIGATION PROJECTS 
Project 
Adams Creek, S.C. 1 
Aquatic Plant Control, N.C. and S.C. 1 5 
Archers Creek, S.C. 
Ashley River, S.C. 1 
Edisto River, S.C. 1 2 
Great Pee Dee River, S.C. 1 3 
Mingo Creek, S.C. 1 2 
Lynches River and Clark Creek, S.C. 1 
Salkahatchie River, S.C. 1 2 4 
Santee River, N.C. & S.C. 1 
Village Creek, S.C. 
Waccamaw River, N.C. & S.C. 1 
Wateree River, S.C. 
For Last 
Full Report 
See Annual 
Report For 
1978 
1968 
1914 
1955 
1938 
1950 
1950 
1982 
1896 
1950 
1985 
1978 
1940 
Construction 
$125,697 
379,680 
20,646 
260,996 
33,103 
183,712 
29,050 
9,500 
15,841 
99,750 
26,500 
262,814 
60,000 
Operation & 
Maintenance 
$ 18,280 
530,852 
900 
269,673 
7,150 
84,170 
180,633 
105,116 
278,170 
151,784 
1/ Completed. 
2/ No commerce reported. 
3/ Curtailment recommended in 1926 (H.D. 467, 69th Cong., 1st Session.) 
4/ Abandonment recommended in 1926 (H.D. 69th Cong., 1st Session.) 
5/ Pilot Program. 
NAVIGATION WORK UNDER SPECIAL AUTHORIZATION 
TABLE 7-D 
(See Section 15 of Text) 
Study Identifications Section Fiscal Year Costs 
Brookgreen Gardens, S.C. 107 $34,399 
Calabash Creek, N.C. 107 26,748 
Charleston Harbor, S.C. 111 72,631 
North Edisto River, S.C. 107 7,400 
OTHER AUTHORIZED BEACH EROSION PROJECTS 
TABLE 7-E 
(See Section 6 of the Text) 
For Last 
Full Report 
See Annual Operations & 
Project Report For Construction Maintenance 
Hunting Island Beach, S.C. 1984 $2,872,7171 -- 
1/ Excludes $1,249,336 contributed funds. 
7-13 
TABLE 7-C

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 7-F OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last 
Full Report 
See Annual Operation & 
Project Report For Construction Maintenance 
Buck Creek, N.C. & S.C. 1 2 1970 $ 298,167 -- 
Cow Castle Creek, S.C. 1 2 1985 250,000 -- 
Cowpens Swamp, S.C. 1 2 1960 18,679 -- 
Crabtree Swamp, S.C. 1 2 1969 97,000 -- 
Eagle Creek, S.C. 1 2 1986 1,245,063 -- 
Edisto River, S.C. 1 3 1947 6,379 -- 
Edisto River, North Fork, S.C. 1 2 1969 127,660 -- 
Edisto River, Vicinity Canaday's Landing, S.C. 1 2 1958 3,160 -- 
Gapway Swamp, S.C. 1969 339,197 -- 
Kingstree Branch, Williamsburg County, S.C. 1 1978 247,242 -- 
Leith's Creek, S.C. 1 2 1982 430,951 -- 
Reddies River Lake, N.C. 1980 985,800 -- 
Reedy River, S.C. 1 3 1974 4,500 -- 
Roaring River, Wilkes County, N.C. 14 1978 370,000 -- 
Saluda River, S.C. 1 2 1963 99,000-- 
Sawmill Branch, S.C. 1 2 1971 248,605 -- 
Shot Pouch Creek, Sumter County, S.C. 1 2 1971 77,400-- 
Simpson Creek, S.C. 1 2 1957 81,000 -- 
Todd Swamp, S.C. 1 2 1964 29,000 -- 
Turkey Creek, Sumter County, S.C. 1 2 1974 319,669 -- 
Wilson Creek, Sumter County, S.C. 1 2 1985 277,111 -- 
1/ Authorized by Chief of Engineers. 3/ Discontinued due to lack of interest. 
2/ Completed. 4/ Phase I only. 
TABLE 7-G FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
PREAUTHORIZATION STUDIES (See Section 23 of Text) 
Study Identifications Section Fiscal Year Costs 
Brushy Creek, Greenville, S.C. 208 $ 686 
Camp Branch/Lynches Lake, Lake City, S.C. 205 32,359 
Cane Creek, S.C. 205 6,784 
Crooked Creek, Bennettsville, S.C. 205 2,519 
Gilder Creek, S.C. 205 7,500 
Hemingway Creek, S.C. 205 2,322 
Hopkins Creek, S.C. 205 31,590 
Jeffries Creek, S.C. 205 7,375 
Kinley Creek, Lexington County, S.C. 205 29,912 
Langston Creek, S.C. 205 7,486 
Socastee Creek, Horry County, S.C. 205 7,893 
Stoop Creek, S.C. 205 3,999 
Welcome Creek, S.C. 205 41,363 
7-14

CHARLESTON, SOUTH CAROLINA DISTRICT 
ACTIVE GENERAL INVESTIGATIONS 
ITEM 
FLOOD DAMAGE PREVENTION STUDIES (CATEGORY 120) 
Gills Creek, S.C. 
Sugar Creek Basin, S.C. & N.C. 
SHORELINE PROTECTION STUDIES (CATEGORY 130) 
Myrtle Beach, S.C. 
REVIEW OF AUTHORIZED PROJECTS (CATEGORY 160) 
MISCELLANEOUS ACTIVITIES (CATEGORY 170) 
Special Investigations 
FERC Licensing Activities 
COORDINATION STUDIES WITH OTHER AGENCIES (CATEGORY 180) 
Department of Agriculture, SCS 
Planning Assistance to States 
FLOOD PLAIN MANAGEMENT SERVICES (CATEGORY 250) 
HYDROLOGIC STUDIES (CATEGORY 260) 
Hydrologic studies 
FISCAL YEAR COSTS 
TOTAL (CATEGORY 100) 
TOTAL (CATEGORY 200) 
CONTINUATION OF PLANNING AND ENGINEERING (CATEGORY 400) 
Charleston Harbor Deepening, S.C. 
TOTAL (CATEGORY 400) 
ADVANCE ENGINEERING & DESIGN (CATEGORY 600) 
Charleston Harbor Deepening, S.C. 
TOTAL (CATEGORY 600) 
TOTAL GENERAL INVESTIGATIONS 
7-15 
TABLE 7-H 
$ 272,427 
26,068 
$ 328,636 
$ 2,681 
$ 49,303 
5,243 
$ 2,454 
90,631 
$ 777,443 
$ 216,678 
2,422 
$ 219,101 
$ 228,771 
$ 228,771 
$ 77,434 
$ 77,434 
$1,302,749 
__ __ _L I I_ __ I_ I_ _ _I I _ __ _ _ __ 
- -- --

SAVANNAH, GA, DISTRICT * 
The District comprises drainage basins that flow 
into the Atlantic Ocean between Port Royal Sound, 
SC, and Cumberland Sound, GA and FL, and 
includes the Atlantic Intracoastal Waterway between 
these points. This area covers the headwaters of the 
Savannah River in southwestern North Carolina, 
eastern Georgia, and a small portion of northeastern 
Florida. 
IMPROVEMENTS 
Navigation 
1. Altamaha, Oconee, and Ocmulgee 
Rivers................................8-1 
2. Aquatic Plant Control ................. 8-2 
3. Atlantic Intracoastal Waterway 
Between Norfolk, VA and St. Johns 
River, FL, (Savannah District) .......... 8-2 
4. Brunswick Harbor, GA ................ 8-3 
5. Savannah Harbor, GA ................. 8-4 
6. Savannah River Below 
Augusta, GA .......................... 8-5 
7. Reconnaissance and Condition 
Surveys ............................. 8-5 
8. Other Authorized Navigation 
Projects ............................. 8-5 
9. Navigation Work Under Special 
Authorization ......................... 8-5 
Beach Erosion Control 
10. Beach Erosion Control Work 
Under Special Authorization ......... 8-5 
11. Tybee Island, GA ..................... 8-5 
Flood Control 
12. Broadway Lake, Anderson County, 
SC ................................. 8-6 
13. Inspection of Completed Flood 
Control Projects .................... 8-7 
14. Other Authorized Flood Control 
Projects ............................ 8-7 
15. Flood Control Work Under Special 
Authorization ....................... 8-7 
Emergency Streambank and Shoreline Protection 
16. Emergency Streambank and Shoreline 
Protection Under Special 
Authorization ....................... 8-7 
Navigation 
1. ALTAMAHA, OCONEE, AND 
OCMULGEE RIVERS, GA 
Location. These rivers are entirely within the State 
of Georgia. (See National Oceanic and Atmospheric 
Administration Survey Map of Georgia, formerly 
U.S. Geological Survey Map of Georgia.)For full 
de-scription of these rivers, see page 636, Annual 
Report for 1932. 
8-1
Multiple-Purpose Projects 
Including Power 
17. Savannah River Basin, GA 
and SC .......................... ... 8-7 
17A. J. Strom Thurmond Dam 
and Reservoir, GA and SC 
(Formerly Clarks Hill Lake, 
GA and SC) .......................... 8-7 
17B. Hartwell Lake, GA and SC ............ 8-8 
17C. Richard B. Russell Dam and Lake, 
GA and SC (Formerly Trotters 
Shoals Lake, GA and SC) ............ 8-8 
18. West Point Lake, Chattahoochee 
River Basin, GA and FL .............. 8-9 
General Investigations 
19. Surveys ............................. 8-9 
20. Collection and Study of 
Basic Data .......................... 8-9 
21. Research and Development ........... 8-9 
22. Continuation of Planning 
and Engineering .................... 8-9 
Tables 
Table 8-A Cost and Financial Statement ... 8-11 
Table 8-B Authorizing Legislation ......... 8-12 
Table 8-C Other Authorized Navigation 
Projects ...................... 8-16 
Table 8-D Other Authorized Flood Control 
Projects ...................... 8-16 
Table 8-E Savannah River Basin, GA and 
SC Dams and Lakes .......... 8-17 
Previous projects. Prior projects for the Altamaha 
Riverhave been adopted, and expenditures made 
under them, by River and Harbor Acts of March 3, 
1881, and September 19,1890; for the Oconee River 
by River and Harbor Acts of June 18,1878, September 
19,1890, and March 3,1905; for the Ocmulgee River, 
by River and Harbor Acts of August 14, 1876, and 
September 19, 1890. 
For Further Details, see page 1815, Annual Report 
for 1915, and page 589, Annual Report for 1938.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Existing project. The authorized project provides 
for an appropriation of $40,000 annually for the 
Altamaha, Oconee, and Ocmulgee Rivers, to maintain 
a 3-foot depth during ordinary summer low water 
and to gradually increase channel depth, so far as 
practicable without sacrificing the maintenance 
work. This project covers the entire Altamaha River 
(including a channel between the river and Darien, 
GA) a length of 137 miles, the lower 139 miles of the 
Oconee River has a mean tidal range of 6.4 feet at its 
mouth which gradually decreases to mile 33, where 
there is no perceptible tidal effect. At Doctortown, 
mile 59, ordinary floods attain a height of about 10 
feet above low water, and at extreme floods, a height 
of about 15 feet above low water. 
On the Oconee River at Dublin the ordinary 
fluctuations attain a hight of 22 feet, and the extreme 
fluctuations aheight of 32 feet, above low water. On 
the Ocmulgee River at Macon the ordinary fluctuations 
attain a height of 15 feet, and the extreme 
fluctuations a height of 25 feet, above low water. 
There is no approved estimated cost for improvement 
or for maintenance. 
Published maps of these rivers are in the following 
documents; Altamaha River, HED 283, 51st Cong., 
2d sess.; Oconee River, HED 211, 51st Cong., 1st 
sess.; Ocmulgee River, HED 215, 51st Cong., 1st 
sess.; and Lower Altamaha River and Darien Harbor, 
GA, HD 610, 77th Cong., 2d sess. (See Table 8-B for 
Authorizing Legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Along these rivers there are 
numerous natural shore landings which are considered 
ample for existing commerce. Facilities for 
recreational boats have been constructed at several 
points. 
Operations and results during fiscal year. Maintenance: 
Total maintenance costs for this fiscal year 
were $3,684. 
Condition at end of fiscal year. The existing project 
is such that the percentage of completion cannot be 
stated. Channel depths have been increased by 
excavating rock shoals and sandbars, by constructing 
contraction and bank-protection works, 
and by closing cutoffs. Navigation has been 
rendered safer by removing obstructions. Many of 
the closing dams and contractions and bankprotection 
works need repairs. The notice of 
availability on the Final Environmental Statement 
appeared in the Federal Register October 21, 1977. 
2. AQUATIC PLANT CONTROL 
Location. Navigable waters, tributary streams, connecting 
channels, and other allied waters in Savannah 
District. 
Existing project. The project provides for control 
and progressive eradication of water-hyacinth, 
lyngbya, alligator weed, Eurasian water milfoil, and 
other noxious aquatic plants from navigable waters, 
tributary streams, connecting channels, and other 
allied waters of the United States, in the combined 
interests of navigation, flood control, drainage, 
agriculture, fish and wildlife conservation, public 
health, and related purposes. The project provides 
for continued research for developing the most 
effective and economic control measures in cooperation 
with other Federal and State agencies in 
accordance with report of Chief of Engineers, H.D. 
251, 89th Cong., 1st sess. The authorizing act 
provides that research costs Shall be borne fully by 
the United States. (See Table 8-C for Authorizing 
Legislation.) 
Local cooperation. Local interests must agree to 
hold the United States free from damages that may 
occur from operations performed in connection 
with this project and participate to the extent of 50 
percent of the cost of the planning and actual 
control operations of the program. Requirements 
are being met. 
Operations and results during fiscal year. Georgia 
Game and Fish Division, Department of Natural 
Resources, who maintain surveillance of potential 
aquatic plant problem areas, reported nuisance 
aquatic plant infestations in Lakes Jackson, 
Blackshear, and Worth. 
A large portion of the funds for aquatic plant control 
were used in the construction of a fish fence and 
stocking of grass carp at Little Ocmulgee State 
Park. Cost during the fiscal year was $143,065. The 
Final Environmental impact Statement was filed 
with EPA on August 6, 1979, and its notice of 
availability appeared in the Federal Register August 
17, 1979. (See Table 8-A for Cost and Financial 
Statement.) 
3. ATLANTIC INTRACOASTAL WATERWAY 
BETWEEN NORFOLK, VA AND THE ST. JOHNS 
RIVER, FL (SAVANNAH DISTRICT) 
Location. This 161-mile section of waterway connects 
Port Royal Sound, SC with Cumberland Sound, 
GA and FL. (See NOAA charts 11489-11507, formerly 
Coast and Geodetic Survey Charts 838-841, inclusive.) 
8-2

SAVANNAH, GA, DISTRICT 
Previous project. (Between Savannah, GA and 
Fernandina, FL) For details see pages 1814, 1821 
-1823 of Annual Report for 1915 and page 585 of 
Annual Report for 1938. 
Existing project. The project provides for a 
waterway 12 feet deep at mean low water and not 
less than 90 feet wide between Port Royal Sound, 
SC and Savannah, GA; 12 feet deep at mean low 
water, with widths of 90 feet in land cuts and narrow 
streams and 150 feet in open waters between Savannah, 
GA and Cumberland Sound, GA and FL; and a 
suitable anchorage basin at Isle of Hope, GA. Mean 
tidal range between Port Royal, SC and Cumberland 
Sound, GA and FL is from 6 to 8 feet with 
fluctuations from 1.5 to 2.5 feet due to winds and 
lunar phases. (See Table 8-B for Authorizing 
Legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Exclusive of adequate terminal 
facilities at ports of entry, this improvement serves 
numerous wharves, some of which are open to the 
public on equal terms. Facilities are considered 
ample for existing commerce. 
Operations and results during fiscal year. 
Maintenance: Two dredges worked the waterway 
during this fiscal year, removing a total of 1,272,602 
cubic yards of material. The length of the Savannah 
District's portion of the waterway was cleaned by 
the dredges Northwood and Hampton Roads. Total 
maintenance costs of the waterway were $1,536,950. 
Condition at end of fiscal year. The main channel 
of the existing project, completed in 1941, is maintained 
at 12 feet. The former main channel, now an alternate 
route through the westerly end of the south channel 
and northerly end of Wilmington River, will be 
maintained to a depth of 7 feet mean low water for 
traffic points north and south of Savannah Harbor. 
Relocation of the main channel from the Frederica 
to Mackay River near St. Simons Island, GA was 
accomplished after construction of a new bridge for 
the Torras Causeway. The notice on the Final 
Environmental impact Statement appeared in the 
Federal Register October 29, 1976. Costs of existing 
completed project to September 30, 1987, were 
$19,027,074 of which $958,096 was for new work 
and $18,068,978 was for maintenance. (See Table 
8-A for Cost and Financial Statement.) 
4. BRUNSWICK HARBOR, GA 
Location. The harbor entrance is 70 statute miles 
south of the entrance to Savannah Harbor, GA and 
25 statute miles north of the entrance to Fernandina 
Harbor, FL. (See NOAA Chart 11215, formerly Coast 
and Geodetic Survey Chart 447.) 
Previous projects. For details see page 1818 of 
Annual Report for 1915 and page 591 of Annual 
Report for 1938. 
Existing project. The project provides for a stone 
jetty 4,350 feet long at the entrance to East River and 
the following channels: 32 feet deep and 500 feet 
wide across the bar; 30 feet deep and 400 feet wide 
through St. Simons Sound, Brunswick River and 
East River to the foot of Second Avenue; 30 feet 
deep and 300 feet wide in Turtle River to the Allied 
Chemical Co. wharf, formerly the Atlantic Refining 
Co.; 27 feet deep and 350 feet wide in East River 
from Second Avenue to its confluence with Academy 
Creek; 24 feet deep and 150 feet wide from St. 
Simons Sound to the mouth of Mill Creek; and a 
channel in Terry Creek 10 feet deep and 80 feet wide 
from its mouth to a point immediately above the 
wharf of the former Glynn Canning Company. All 
depths refer to mean low water. Mean tidal range on 
the bar is 6.5 feet, at the city of Brunswick 7.3, and 
7.6 feet at the upper end of the harbor. For further 
details see Annual Report for 1962. 
Local cooperation. Complied with to date. 
Terminal facilities. Eighteen wharves and piers, 
almost all privately owned, have a berthing space of 
7,530 linear feet. The Port of Brunswick and the 
State of Georgia have a transit shed and modern 
docks with 1,640 feet of berthing space (three 
general cargo berths) on East River. For further 
details see Port Series No. 14, Corps of Engineers 
(revised 1982). 
Operations and results during fiscal year. 
Maintenance: During 1987, contractdredgesArlington 
and Cherokee removed a total of 478,777 cubic 
yards of material from the harbor while the 
government hopper dredge McFarland removed 
87,455 cubic yards of material from the Bar 
Channel. 
Of the total $2,974,663 spent on the harbor during 
this fiscal year, the hopper dredge McFarland was 
rented for $1,555,129 and $545,535 was spent on 
contract dredges for the Terry Creek and East River 
projects. An additional $75,345 was spent to 
reimburse the Glynn County Mosquito Control 
Commission for work done in the vicinity of Andrews 
island. 
Expenditures for surveys totaled $178,810 for dykes 
8-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
and dredging, and $83,153 for S&I.Other expenditures 
included $18,825 for depot operations, project 
management totaled $88,072, and $165,816 for E&D. 
Total operation and maintenance cost amounted to 
$2,974,663. (See Table 8-A for Cost and Financial 
Statement.) 
Condition at end of fiscal year. The existing project 
was completed in December 1960. General condition 
of the harbor works is satisfactory, providing 
maintenance dredging continues. The notice on the 
Final Environmental Impact Statement appeared in 
the Federal Register October 3, 1975. Authorized 
depths were maintained throughout the fiscal year. 
Costs for existing completed project to September 
30, 1987 were $62,482,208 of which $4,573,433 was 
for new work and $57,908,775 was for maintenance. 
(See Table 8-A for Cost and Financial Statement.) 
5. SAVANNAH HARBOR, GA 
Location. Harbor entrance is 75 statute miles south 
of Charleston Harbor, SC and 70 statute miles north 
of Brunswick Harbor, GA. (See NOAA Chart 11512, 
formerly Coast and Geodetic Survey Chart 440.) 
Previous projects. For details see page 1810 of 
Annual Report for 1915 and page 578 of Annual 
Report for 1938. 
Existing project. The project provides for a channel 
40 feet deep and 600 feet wide across the ocean bar 
about 7.0 miles; 38 feet deep and 500 feet wide to the 
Seaboard Coast Line terminal; 38 feet deep and 400 
feet wide to the vicinity of Garden City (Georgia 
Ports Authority terminal) and 36 feet deep and 400 
feet wide to the vicinity of Savannah Sugar Refinery 
of Savannah Foods and Industries, Inc. about 22.6 
miles; and 30 feet deep and 200 feet wide to a point 
1,500 feet below the Atlantic Coastal Highway 
bridge, about 1.5 miles, a total length of 31.1 miles; 
Fig Island and Marsh Island Turning Basins 34 feet 
deep by 900 feet wide by 1,000 feet long in the 
vicinity of the Seaboard Coast Line terminal, and 
American Oil Company terminal; Kings Island Turning 
Basin 38 feet deep by 1,500 feet wide by 1,600 feet 
long in the vicinity of Garden City terminal of the 
Georgia Port Authority; Argyle Island and Port 
Wentworth Turning Basins 30 feet deep by 600 feet 
wide by 600 feet long near Savannah Sugar Refinery 
terminal and at the extreme upper limit of the project 
near Continental Can Company terminal; and a 
1,200 foot long by 1,050 foot wide by 40 foot deep 
Oyster Bed Island Turning Basin in the vicinity of 
Georgia Ports Authority LASH facility. The project 
also provides for sediment control works consisting 
of a tide gate structure across Back River; a sediment 
basin 40 feet deep, 600 feet wide, about 2 miles long, 
with an entrance channel 38 to 40 feet deep and 300 
feet wide; a drainage canal across Argyle Island 15 
feet deep and 300 feet wide; control works and 
canals for supplying fresh water to the Savannah 
National Wildlife Refuge; and facilities to mitigate 
damages to presently improved areas other than 
refuge lands. Mean range of tide is 7.9 feet at the 
upper end of the harbor and 6.9 feet at the lower end. 
Extreme ranges are about 11.1 and 10.7. feet, 
respectively. 
Local cooperation. Local interests must provide 
suitable disposal areas and retaining dikes for 
construction and future maintenance of the project. 
The Chatham County Board of Commissioners, as 
local assurers, have met all requirements to date. 
Terminal facilities. Sixty-one piers and wharves 
adequately serve existing waterborne commerce of 
the port. These facilities, with use of dolphins, have 
a combined berthing space of 46,930 linear feet with 
water depths alongside ranging up to 38 feet at 
mean low water. Included in the berthing space are 
six container berths with 271 acres of handling area. 
All have railway and highway connections. LASH 
facilities are located at the entrance to the harbor 
and have depths ranging up to 38 feet mean low 
water. The berthing space of LASH facilities is 
included in the above combined berthing space. For 
further details, see Port Series No. 14, Corps of 
Engineers (revised 1982) and Annual Report for 
1962. 
Maintenance. The contract dredge Enterprise 
removed a total of 1,337,398 cubic yards of material 
from the harbor and the Fig Island Turning Basin. 
Additionally, the dredges Cherokee and Jim Bean 
removed 3,863,402 cubic yards of material from the 
sediment basin and pumped to Disposal Area 13. 
Total operational costs for the harbor were $624,675 
including such items as salinity monitoring, surveying, 
cultural resource surveys, and $54,988 of 
general overhead expenses. Total operation and 
maintenance costs for the fiscal year amounted to 
$2,799,769 of which $71,614 was spent on the 
operation of the Tidegate structure. 
Condition at the end of the fiscal year. Training 
walls, jetties, and other structures are in faircondition. 
Authorized channels.are maintained by a planned 
dredging program with work at critical areas when 
necessary. The notice on the Final Environmental 
8-4

SAVANNAH, GA, DISTRICT 
Impact Statement appeared in the Federal Register 
June 25, 1976. Notices of availability on two Final 
Supplements to the Environmental Impact Statement 
appeared in the Federal Register September 25, 
1978, and January 8, 1980. 
Costs of existing projects to September 30, 1987 
were $191,722,029, of which $46,185,743 was for 
new work and $145,536,286 was for maintenance. 
(See Table 8-A for Cost and Financial Statement.) 
6. SAVANNAH RIVER BELOW AUGUSTA, GA 
Location. Savannah River is formed by the confluence 
of the Tugaloo and Seneca Rivers on the 
boundary line between South Carolina and Georgia. 
It flows southeast 314 miles, forming the boundary 
line between the two states, and empties into the 
Atlantic Ocean 16.6 miles below Savannah, GA. 
(See NOAA Charts 11514 and 11515, formerly 
Geological Survey maps of South Carolina and 
Georgia.) 
Previous project. For details see page 1813 of 
Annual Report for 1915 and page 581 of Annual 
Report for 1938. 
Existing project. The authorized project provides 
for a channel 9 feet deep and 90 feet wide (at 
ordinary summer flow of 5,800 second-feet at 
Augusta, GA) from the upper end of the Savannah 
Harbor to the head of navigation at Augusta, 3 miles 
above Fifth Street Bridge, a total distance of about 
181 miles. A lock and dam is located approximately 
15 miles below the upper limit of the project at New 
Savannah Bluff. Improvement is to be obtained by 
construction of contraction works, closure of cutoffs, 
bank protection, dredging, removal of snags, over 
hanging trees and wrecks, and open-river regulation. 
Mean tidal variation at the mouth of the river is7 feet. 
Freshet variation above the normal pool level 
(elevation 114.5 mean sea level) of New Savannah 
Bluff Lock and Dam at miles 187 is ordinarily about 
13 feet with an extreme of 34 feet. Latest approved 
project cost estimate for providing a 9-foot channel 
(September 1963) is $6,576,000 exclusive of amounts 
expended on previous projects. For further details 
see Annual Report for 1962. 
Local cooperation. Complied with to date. 
Terminal facilities. The only water terminals 
served by this improvement are at Augusta, Sylvania, 
and at or near Savannah. Augusta provided a 
municipal dock valued at $50,000 and Georgia Ports 
Authority constructed a state port at Augusta, GA 
costing about $418,000. These facilities were expanded 
in 1965 at an additional cost of about 
$250,000. These are supplemented by natural landings 
along the river and extensive facilities at Savannah. 
Operations and results during fiscal year. Maintenance: 
Effective April 30,1987 an agreement was 
signed with the city of Augusta, GA to turn over 
operation and maintenance of the lock and recreation 
area. 
Condition at the end of the fiscal year. In general, 
open-channel works are in good condition. The 
notice on the Final Environmental Impact Statement 
appeared in the Federal Register February 18, 1977. 
The total cost for the year was $788,320. There were 
no dredging projects during this fiscal year. Inspection 
of completed works amounted to $11,540, 
while $11,259 was spent to update the remote 
control facilities at the lock. 
7. RECONNAISSANCE AND CONDITION SURVEYS 
Survey Section performed project condition surveys 
on the following active O&M navigation projects: 
Savannah Harbor 
Brunswick Harbor 
AIWW 
Savannah River Below Augusta 
General regulatory function expenditures for the 
fiscal year were $1,551,368. 
8. OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Table 8-C.) 
9. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION 
As specified by the authorizing document for BelIville 
Point, GA, $20,000 was transferred to the Georgia 
Department of Natural Resources for use in their 
Oyster Seeding Program. Costs for Bellville totaled 
$27,205. The Valona, GA detailed project study was 
restored in fiscal year 87 for a total expense of 
$4,383. 
Beach Erosion Control 
10. BEACH EROSION CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
A reconnaissance investigation was initiated on the 
shoreline erosion problems at Crooked River State 
Park, GA at a F.Y cost of $11,549. 
11. TYBEE ISLAND, GA 
Location. Tybee Island is located directly south of 
8-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
the Savannah River entrance, about 17 miles east of 
the city of Savannah, GA. (See NOAA Charts 11512, 
11513, and 11509, formerly U.S. Coast and Geodetic 
Survey Charts Nos. 440, 1240, and 1241, and on 
maps included in HD 92-105, 92nd Cong.) The only 
portion of the island that has been developed is 
bounded on the north by the south channel of the 
Savannah River, on the east by the Atlantic Ocean, 
and on the south and west by Tybee Creek and other 
small tidal streams. This area, hereinafter referred to 
as "Tybee Island," is occupied by the city of Tybee 
Island. The ocean face of this area has had a wide 
sandy beach. The Tybee Island is about 3.5 miles 
long from its northerly tip to the mouth of Tybee 
Creek with an average width of about 0.5 mile. 
Behind the beach lies a line of sand dunes, a number 
of which have been removed during the years to 
make room for improvements and for various other 
reasons. Those that remain are from 10 to 20 feet 
high. The ground elevation west of the dunes is from 
10 to 18 feet and slopes westward to the salt marsh. 
Existing project. The approved project plan of 
improvement provides for an 800 foot rock groin at 
the north end of the island, with a 225 foot tie-in to 
high ground. An additional 1,200 foot extension of 
this groin is deferred, as are two additional intermediate 
groins (480 feet long); these will be 
added at a later date, if needed. The plan also 
provides for the initial restoration of approximately 
13,300 feet of beach, from the vicinity of 18th Street 
to the terminal groin located at the northern end of 
the island. Periodic nourishment will be provided as 
needed to maintain suitable beach dimensions. In 
1981, the plan was modified and now calls for the 
addition of a groin at the south end and modification 
and rehabilitation of the north rock groin and 
renourishment. 
Local cooperation. Local interests must: (a) contribute 
in cash the required percentage of the first 
cost (including costs for construction, engineering 
and design, and administration; and excluding the 
cost of lands, easements, rights-of-way and relocation) 
of all items of work to be provided by the Corps of 
Engineers. The local contribution is presently 
estimated at 51.0 percent to be paid in a lump sum 
prior to start of construction or in installments prior 
to the start of pertinent work items in accordance 
with construction schedules as required by the 
Chief of Engineers, the final apportionment of cost 
to be made after the actual costs have been determined; 
(b) provide maintenance and repair of the 
groins, and provide (after the first 10 years of project 
life) periodic nourishment of the restored beach as 
may be required to serve the intended purpose 
during the life of the project; (c) provide without 
cost to the United States all lands, easements, 
rights-of-way, and relocations required for construction 
and subsequent nourishment of the project; 
(d) hold and save the United States free from claims 
for damages that may result from construction, 
maintenance, and nourishment of the project; (e) 
control water pollution to the extent necessary to 
safeguard the health of bathers; and (f) provide 
without cost to the United States access and facilities 
necessary for realization of the public benefits upon 
which Federal participation is based, and maintain 
continued public use of the beach and administer it 
for public use during the life of the project, and 
provide further that construction on the project 
shall not be started until local interests furnish lands 
for beach access and parking, satisfactory to the 
Chief of Engineers, for the reach from First Street to 
the terminal groin. To date, local cooperation is 
being provided as required. 
Condition at the end of the fiscal year. In February 
1987, the first periodic renourishment contract was 
awarded, calling for the placement of approximately 
1 million cubic yards of sand on two reaches of the 
island; the south end from the mouth of Tybee 
Creek to 14th Street, and the north end from the 
North terminal groin to about 6th Street. The contract 
was completed in May 1987 at a contract cost of 
$1,988,843. 
FLOOD CONTROL 
12. BROADWAY LAKE, ANDERSON COUNTY, SC 
Location. The Broadway Lake is located about 4 
miles southeast of Anderson, South Carolina. It is 
formed at the junction of Broadway Creek and Neals 
Creek in the headwaters of Rocky River, a tributary 
of the Savannah River. 
Existing project. The authorization provides for the 
U.S. Army Corps of Engineers to undertake a 
demonstration project for the removal of silt and 
aquatic growth from an existing lake known as 
Broadway Lake, owned by Anderson County, South 
Carolina. This lake has a surface area of about 1 
square mile and a tributary area of about 44 square 
miles with an existing dam and concrete spillway. 
The spillway is 50 feet wide, about 19 feet high, and 
flanked by earth on the west side. The total length of 
the dam is about 610 feet. The National Dam Safety 
Inspection Program determined that the dam did 
not meet the safety criteria. Since the repairs of the 
dam, spillway, and low-level outlet are not the 
authority of the demonstration project, the U.S. 
Army Corps of Engineers withheld implementation 
8-6

SAVANNAH, GA, DISTRICT 
of the project pending repairs to the dam by the 
state or local authorities. 
Local cooperation. The local interests have made 
the necessary repairs to the dam and have also 
removed the silt and aquatic weeds on their own. 
Operations and results during the fiscal year. The 
project is inactive. The Detailed Project Report was 
returned for the District to notify appropriate 
interests that the U.S. Army Corps of Engineers can 
no longer participate in primary recreation projects. 
Since local interests have completed the project ort 
their own, it has been identified for deauthorization 
under proceedures specified in PL 99-662, section 
1001(b) dated November 17, 1986. 
13. INSPECTION OFCOMPLETED FLOOD CONTROL 
PROJECTS 
Expenditures for inspections of completed flood 
control projects amounted to $18,135. 
14.OTHERAUTHORIZE DFLOO D CONTROLPROJECTS 
(See Table 8-D.) 
15. FLOOD CONTROL WORK UNDER SPECIAL 
AUTHORIZATION 
Flood control activities pursuant to Section 205, 
Public Law 858, 80th Cong., as amended (preauthorization 
studies). Preauthorization studies continued 
through fiscal year 87 on Placentia Canal, GA 
and Springfield Canal, GA. The Draft Preliminary 
Report on Placentia Canal continued at a fiscal year 
cost of $24,934. Detailed project studies continued 
in fiscal year 87 on Springfield Canal, GA at a cost of 
$75,022; Casey Canal, GA at a cost of $1,950; and 
Federal Prison Creek, GA costs were $13,316. The 
total fiscal year costs for preauthorization studies 
was $115,222. 
Emergency flood control activities - repair, flood 
fighting, and rescue work (Public Law 99, 84th 
Cong. and antecedent legislation). Revisions to 
emergency manuals, emergency planning, inspection, 
supplies, emergency operations, and exercises fiscal 
year costs were $290,766. 
Emergency Streambank and Shoreline Protection 
16. EMERGENCY STREAMBANK AND SHORELINE 
PROTECTION UNDER SPECIAL AUTHORIZATION. 
Under authorization of Section 14, Flood Control 
Act of 1946 as amended, $7,500 was expended for 
an initial assessment during the fiscal year. 
Multiple-Purpose Projects Including Power 
17. SAVANNAH RIVER BASIN, GA AND SC 
Location. Works covered by this project consist of 
a series of 11 dams and lakes on the Savannah River 
and its tributaries in GA and SC. (See Geological 
Survey maps of GA and SC.) 
Existing project. The Flood Control Act of 1944 
approved the general plan for comprehensive 
development of the Savannah River basin for Flood 
control and other purposes (H.D. 657, 78th Cong., 
2d sess.) and authorized construction of the J. 
Strom Thurmond Dam and Reservoir Project on the 
Savannah River in Georgia and South Carolina as 
the initial step of this development. The Flood 
Control Act of 1950 authorized construction of 
Hartwell Lake under the general plan. Trotters 
Shoals which will replace Goat Island and Middieton 
Shoals was authorized for construction by 
the Flood Control Act of 1966 at an estimated cost of 
$84,900,000. J. Strom Thurmond Dam and Reservoir 
and Hartwell Lake are the only projects in the 
comprehensive plan that have Ibeen constructed. 
(See Table 8-E on Dams and Lakes.) 
Duke Power Company has completed construction 
on the Keowee-Toxaway power complex on the 
Keowee River in the headwaters of Hartwell Lake 
and construction of the Jocassee pump-storage 
power project in the headwaters of the Keowee- 
Toxaway project. The Keowee-Toxaway power complex 
is located on the Newry-Old Pickens site 
identified in the approved comprehensive plan. 
Individual reports on J. Strom Thurmond Dam and 
Reservoir, Hartwell, and Richard B. Russell Lakes 
follow. 
Local cooperation. None required. 
17A. J. Strom Thurmond Dam and Reservoir, 
(Formerly Clarks Hill Lake) GA AND SC 
Location. J. Strom Thurmond Dam and Reservoir 
is locatedat mile 237.7 on the Savannah River about 
22 miles upstream from Augusta, GA. (See Geological 
Survey maps of GA and SC.) 
Existing project. The authorized project provides 
for construction of J. Strom Thurmond Dam and 
Reservoir, the final cost of which was $79,156,300. 
The dam has a concrete section 2,282 feet long with 
a maximum height of 200 feet and a controlled 
spillway 1,096 feet long. The concrete section is 
flanked on the west side by a rolled-earth embankment 
of 2,069 feet and on the east side by a 
similar embankment of 1,329 feet. The total length 
8-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
of the dam is 5,680 feet. The lake covers 70,000 acres 
at maximum power pool elevation 330. It provides a 
total storage capacity of 2,900,000 acre-feet allocated 
as follows: flood control 390,000 acre-feet; hydropower- 
1,405,000 acre-feet; dead storage 1,465,000 
acre-feet. Seven 40,000-kilowatt genera-tors have a 
combined generating capacity of 280,000 kilowatts 
with an average annual output of 700 million kilowatthours 
of electrical energy. 
Local cooperation. None required. 
Operations and results during fiscal year. Gross 
generations of electric energy for the period was 
551,255,700 kilowatt-hours, most of which was 
delivered to the Southeastern Power Administration. 
Prevented flood damages totaled $1,083,900. 
Maintenance: Operation and maintenancecostsduring 
the fiscal year amounted to $7,806,286. The notice 
of availability on the Final Environmental Impact 
Statement on J. Strom Thurmond Dam and Reservoir 
Operation and Maintenance appeared in the December 
18, 1981 Federal Register. In fiscal year 1987, 
7,725,000 persons visited the facility. 
Condition at the end of the fiscal year. Construction 
is complete except for providing additional 
recre-ational development. (See Table 8-A for Cost 
and Financial Statement.) 
17B. HARTWELL LAKE, GA AND SC 
Location. Hartwell Lake is on the Savannah River 
305 miles above its mouth and 89 miles upstream 
from Augusta, GA. (See Geological Survey maps of 
GA and SC.) 
Existing project. The dam is a concrete gravity-type 
structure, 1,900 feet long with a maximum height of 
204 feet and a controlled spillway 568 feet in length. 
The concrete section is flanked on the east and west 
abutments by earth embankments totaling 13,390 
feet in length and by a saddle dike 2,590 feet long 
also on the west side. Total length of the dam is 
17,880 feet. At maximum conservation pool elevation 
of 660 feet the lake covers 55,950 acres. Total 
capacity of the lake is 2,843,000 acre-feet of storage 
allocated as follows: flood control 293,000 acre-feet 
hydropower; 1,416,000 acre-feet dead storage; 
1,134,000 acre-feet. Four 66,000 kilowatt generators 
having generating capacity of 264,000 kilowatts 
were installed initially with provisions for a future 
unit. A fifth 80,000 kilowatt generating unit has been 
installed which increased the rated capacity to 
344,000 kilowatts. 
Local cooperation. None required. 
Operations and results during the fiscal year. Cost 
of activities during this fiscal year amounted to 
$6,792,606. A credit of $17,301 was received for cost 
sharing (Code 713) at the 1-85 Destination Park. 
The fiscal year upper diversion dam rehabilitation 
cost amounted to $6,848. Gross generation of 
electrical energy for the period amounted to 
350,151,300 kilowatt hours, most of which was 
delivered to the Southeastern Power Administration. 
Flood damages prevented were estimated to be 
$510,100,000. 
Maintenance. Operation and maintenance costs 
during the fiscal year amounted to $6,792,607. The 
notice on the Final Environmental Impact Statement 
on the operation and maintenance of Hartwell Dam 
and Lake appeared in the Federal Register on 
August 21, 1978. Approximately 12,900,000 persons 
visited the lake in fiscal year 1987. 
17C. RICHARD B. RUSSELL DAM AND LAKE, GA 
AND SC (FORMERLY TROTTERS SHOALS LAKE, 
GA AND SC) 
Location. Richard B. Russell Dam is on the Savannah 
River 275.1 miles above its mouth, 29.9 miles below 
Hartwell Dam and about 37.4 miles above Clarks Hill 
Dam. (See NOAA Survey maps of GA and SC.) 
Existing project. The authorized project provides 
for construction of Richard B. Russell Dam and 
Lake substantially in accordance with the recommendations. 
The latest approved (fiscal year 1987) 
cost estimate for the project is $554,000,000 of 
which $439,811,000 is for construction; $28,580,000 
for lands and damages; $4,683,000 for cultural 
resources; and $83,926,000 for engineering/design 
and supervision/administration. Approval was received 
January 1977 to include minimum provisions 
for pumped storage. A notice of availability of a 
Final Environmental Impact Statement covering 
pumped storage was published in the Federal 
Register on February 18,1977 and October 26,1979. 
A notice of availability on the Final Supplement of 
the Environmental Impact Statement on Fish and 
Wildlife Mitigation for the Russell project appeared 
in the Federal Register on December 11, 1981. 
Scheduled contract awards for fiscal year 88 and 
fiscal year 89 include:Oxygen Producing Facility; 
Rock Excavation Tailrace Area; Anti-Fish Entrainment 
(Bar Racks); Remaining Recreation 
Facilities, SC; Calhoun Falls State Park, SC; McCalla 
State Park, SC; Powerhouse Construction; Governors; 
8-8

SAVANNAH, GA, DISTRICT 
15 KV Disconnect Switch, Schedule D; Tailrace 
Dredging; and Switchyard Equipment. 
During fiscal year 87,362,970,000 kilowatts of power 
were generated. 
Maintenance. The operation and maintenance cost 
for the fiscal year amounted to $3,827,383. These 
funds were for management of the lake activities. 
Condition at the end of fiscal year. The project is 
79 percent complete. 
Costs of project to September 30, 1987 were 
$457,524,499 of which $445,799,509 was used for 
new work and $11,724,990 for maintenance. (See 
Table 8-A for Cost and Financial Statement.) 
18. WEST POINT LAKE, CHATTAHOOCHEE RIVER 
Location. The West Point Lake is located on the 
Chattahoochee River, 2.8 miles upstream from West 
Point, GA and was authorized by the Flood Control 
Act of 1962 (H.D. 570, 87th Cong., 2d sess.). The 
project was designed and constructed for flood 
control, power, recreation, fish and wildlife development, 
and stream flow regulation for downstream 
navigation. Design and construction was accomplished 
by the Savannah District, U.S. Army Corps 
of Engineers for the Mobile District, U.S. Army 
Corps of Engineers. For more detail, see the Mobile, 
AL, District's Report of the Chief of Engineers, U.S. 
Army 1987. 
General Investigation 
19. SURVEYS 
Fiscal year costs were $1,275,454 of which $502,091 
was for navigation studies; $627,244 for flood control 
studies; $72,300 for special investigations; $72,783 
for coordination with other agencies; $1,037 for 
coordination of FERC Licenses, and $1,010 for 
inspection of dams. 
20. COLLECTION AND STUDY OF BASIC DATA 
Work continued under the Flood Plain Management 
Services on the compilation of flood information, 
potential flood damages, and identification of those 
areas subject to inundation. Fiscal year expenditures 
for Flood Plain Management Services were $94,104 
while expenditures for Technical Services were 
$62,736. 
Flood Plain Management Services included responses 
to other Federal agencies to aide them in fulfilling 
the requriements of EO 11988 (Management of Base 
Flood Area). Through the Technical Services Program, 
flood problems in several areas were analyzed and 
possible improvements were identified. During fiscal 
year 87, the Flood Plain Management Services 
Branch continued the Coastal Georgia Hurricane 
Evacuation Study. This study is a three year joint 
effort of the state of Georgia, local officials, Federal 
Emergency Management Agency, and the U.S. 
Army Corps of Engineers. Funds available for the 
study in fiscal year 87 were $135,000 of which 
$75,000 came from the U.S. Army Corps of Engineers 
Flood Plain Management Program funds. Fiscal 
year expenditures were $80,804. The hydrologic 
studies costs were $5,029. 
21. RESEARCH AND DEVELOPMENT 
No funds were expended for research and development 
during the fiscal year. 
22. CONTINUATION OF PLANNING AND ENGINEERING 
Lake Lanier Reregulation Dam. In fiscal year 87, 
the Lake Lanier Reregulation Dam General Design 
Memorandum was completed at a cost of $209,567. 
The recommended project is the construction of a 
reregulation dam on the Chatahoochee River, 6.3 
miles down river of Buford Dam. Project benefits are 
hydropower and water supply. 
Savannah River Basin at Oates Creek, GA. Oates 
Creek is a major drainage outlet for flood waters 
from an urban area of Augusta, GA. A flood control 
study of Oates Creek was authorized and completed 
as part of the Savannah River Basin study. The 
Oates Creek study area is located just south of 
Augusta, in Richmond County. 
The recommended plan is a channel and bridge 
modification flood control plan and has received 
support from Federal, state, and local governmental 
agencies with no environmental opposition. The 
local sponsor, Richmond County, expressed 
support for the project and intent to participate 
financially. The plan consists of improvements to 
approximately 12,300 feet of channel and consists 
of concrete-lined channels, grass-lined channels, a 
lw levee, modifications of bridges and culverts, 
and relocation of utilities. The CP&E effort began in 
October 1983 and consisted of the preparation of a 
General Design Memorandum (Sept. 1986). Upon 
the completion and approval of the General Design 
Memorandum, negotiations were initiated with the 
local sponsor to develop a Local Cooperation 
Agreement (LCA). The LCA package was approved 
by Richmond County in August 1987 and was 
forwarded to the U.S. Army Corps of Engineers 
8-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Office of the Chief of Engineers for approval. Fiscal 
year expenditures were $52,832. 
Savannah Harbor Widening. The Savannah Harbor 
Widening project is designed to increase the width 
of the navigation channel from 400 to 500 feet along 
a 5.6 miles section of the Savannah River. During 
fiscal year 87 plans and specifications were prepared 
and the Chatham County Commissioners, local 
sponsor, started acquiring property. A LCA has 
been signed. Fiscal year expenditures were $598,582. 
8-10

SAVANNAH, GA, DISTRICT 
TABLE 8-A 
See 
Section 
in Text 
COST AND FINANCIAL STATEMENT 
Project Funding FY 84 FY 85 FY 86 FY 87 
1. Altamaha, Oconee 
and Ocmulgee Rivers, 
GA 
2. Aquatic Plant 
Control (1965 
R&H Act) 
3. Atlantic Intracoastal 
Waterway between 
Norfolk, VA, and the 
St. Johns River, FL 
4. Brunswick Harbor, 
GA 
5. Savannah Harbor, 
GA 
6. Savannah River 
below Augusta, 
GA 
11. Tybee Island, GA 
12. Broadway Lake, 
SC 
13. Inspection of 
Completed Flood 
Control Works 
17.A J. Strom Thurmond 
Dam and Reservoir, 
GA and SC 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
- 4,000 
- 269 46 3,684 
9,000 30,000 50,000 205,000 
11,488 11,433 58,950 143,065 
934,000 1,088,000 608,000 1,531,800 
914,900 950,290 752,177 1,536,950 
- - - 
8,636,530 1,800,000 8,101,443 
9,605,206 1,896,159 8,110,481 
4,207,000 10,238,200 3,635,000 
8,049,868 10,084,654 3,528,413 
3,050,000 
2,974,663 
2,866,500 
2,799,769 
821,457' 
821,457' 
1,917,9823 
1,917,9812.3 
546,159 
470,572 
958,096' 
958,096' 
18,088,7215 
18,068,9785 
4,573,6086 
4,573,433' 
58,086,894' 
57,908,7757 
46,187,721' 
46,185,743' 
145,957,640' 
145,536,286' 
- - - - 6,740,031' � 
- - - - 6,740,031' � 
627,000 804,000 543,000 804,000 16,924,492 
884,597 759,000 550,830 788,320 16,817,908 
- 386,949 1,053,000 387,000 
- 307,887 209,486 1,225,729 
13,000 -15,000 18,500 21,000 
59,775 15,387 29,646 18,135 
- - 
932,843 5,612 
6,673,800 7,554,000 6,386,( 
7,040,063 7,746,130 6,288,f 
4,357,249" 
4,352,270" 
99,000 
99,000 
205,018 
201,866 
- - 84,841,29012 
- - 84,840,263'2 
000 7,997,022 77,159,054'3 
836 7,739,609 76,125,153'3 
8-11 
Total Cost 
to 
SepL 30,1987I

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 8-A 
See 
Section 
in Text Project 
COST AND FINANCIAL STATEMENT 
Funding FY 84 FY 85 FY 86 FY 87 
17.B Hartwell Lake, GA 
and SC 
17.C Richard B. Russell 
Dam and Lake, GA 
and SC (Formerly 
Trotters Shoals) 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
-450,000 
1,282,815 
4,803,000 
5,031,036 
1,450,000 
2,463,415 
270,000 
213,815 
6,986,600 
6,863,402 
-100,000 
138,899 
36,300,000 21,400,000 
35,491,655 22,368,222 
1,231,300 2,870,000 
1,005,621 3,055,270 
-35,000 
355,807 
6,404,500 
6,208,294 
69,000 
82,425 
- 
-29,515 
6,823,622 
6,725,929 
6,849 
9,310,000 19,000,000 
7,217,141 9,753,114 
3,734,000 3,599,922 
3,233,598 3,760,665 
115,937,98514,.15 
115,782,898"1415 
69,188,026"6 
68,358,65916 
6,619,000 
6,559,773 
445,799,509 
433,630,084 
12,159,222 
11,724,990 
1. Includes $760,610 for previous projects. 
2. Includes $111,950 for previous projects. 
3. Does not include $69,356 contributed funds. 
4. Includes $194,497 for previous projects. 
5. Includes $134,798 for previous projects. Does not 
include $35,000 appropriated but unexpended of contributed 
funds in FYs 86 and 87. 
6. Includes $643,465 for previous projects and 
$97,521 expended from Public Works Funds for existing 
project. Does not include $10,000 contributed funds. 
7. Includes $54,414 for previous projects, $4,995 
expended from Public Works Funds for existing project, 
and $2,150,000 under 1983 Job Bill Act. Does not include 
contributed funds by Brunswick and Georgia Port Authority. 
8. Includes $7,260,384 for previous projects. Does 
not include $46,847 for removal of sunken vessels or 
contributed funds. 
9. Includes $298,894 for previous projects and 
$855,941 contributed funds. 
10. Includes $93,480 for previous projects and 
TABLE 8-B AUTHORIZI 
$1,634,562 from Public Works Fund. 
11. Does not include $3,756,758 contributed funds. 
12. Does not include $395,634 accelerated Public 
Works Funds. Includes $4,558,613 appropriated under 
Code 710. Also includes $1,000,000 expended under the 
1983 Job Bill Act. 
13. Includes $316,760 under special recreation use 
fees and $736,000 under the 1983 Job Bill Act. 
14. Includes $17,515,000 appropriated for construction 
of 5th Unit of which $17,469,002 has been 
expended. 
15. Does not include $276,200 accelerated Public 
Works Funds. Includes $4,861,000 appropriated under 
Code 710 of which $4,817,985 has been expended and 
$545,000 expended under the 1983 Job Bill Act. 
16. Includes $576,019 expended special recreation 
use fees. 
NG LEGISLATION 
See Date of 
Section Authorized 
in Text Act Project and Work Authorized Documents 
1. July 25, 1912 
and March 2, 1945 
Oct. 27, 1965 
Section 302 
ALTAMAHA, OCONEE AND OCMULGEE RIVERS, GA. 
Channel 3 feet deep and 60 to 100 feet wide. 
Provides for control and progressive eradication of 
noxious aquatic plant growths. 
HD 443, 62d Cong., 2d sess. 
HD 610, 77th Cong., 2d sess. 
HD 251, 89th Cong., 1st sess. 
8-12 
Total Cost to 
Sept. 30, 1987 I I _

SAVANNAH, GA, DISTRICT 
TABLE 8-B (continued) 
See 
Section 
in Text 
AUTHORIZING LEGISLATION 
Date of 
Authorized 
Act Project and Work Authorized 
ATLANTIC INTRACOASTAL WATERWAY 
BETWEEN NORFOLK, VA., AND ST. JOHNS 
RIVER, FLA., (SAVANNAH DISTRICT) 
3. June 3, 1896 Section from Beaufort, S.C. to Savannah, Ga. Route No. 2 
adopted. 
Mar. 3, 1899 Route No. 1 adopted. 
July 13, 1892 Section from Savannah, Ga. to Fernandina, Fla. Original 
7-foot channel. 
Mar. 3, 1905 Provided for Skidaway NarrQws. 
July 25, 1912 Incorporated alternative routes previously improved as 
separate projects and the auxiliary channels. 
Aug. 8, 1917 Section fromm Cumberland Sound, Ga. and Fla. to St. Johns 
River, Fla. Consolidation of the 3 sections shQwn above, 
into "Waterway between Beaufort, S.C. and St. Johns River, 
Fla." 
Mar. 2, 1919 Section from Beaufort, S.C. to Cumberland Sound, Ga. 
and Fla. Removing logs and snags from Generals Cut. 
Mar. 2, 1919 Improving Back River to provide a channel 7 feet deep and 
150 feet wide. 
Mar. 3, 1925 Channel 75 feet wide between Beaufort, S.C., and 
Savannah, Ga. 
July 3, 1930 Channel from Baileys Cut to Dover Creek. 
Aug. 26, 1937 A 7-foot protected channel around St. Andrews Sound. 
Aug. 26, 1937 A 12-foot channel between Beaufort, S.C., and Savannah, 
Ga. via Beaufort River and Port Royal Sound. 
June 20, 1938 A 12-foot channel between Savannah, Ga., and Fernandina, 
Fla., various cutoffs; and anchorage basin at Thunderbolt, 
Ga. 
Mar. 2, 1945 An alternate route 9 feet deep and 150 feet wide in that 
part of Frederica River, Ga., not now traversed by the main 
route, at no additional cost to the United States. 
Oct. 15, 1981 Main channel relocated from Frederica River to 
Mackay River in the vicinity of Torras Causeway. 
BRUNSWICK HARBOR, GA 
4. Mar. 3, 1879 Construction of East River jetty. 
Mar. 2, 1907 Channels in the inner and outer harbors of 30-foot depth 
at mean high water, with widths varying from 150 
feet in Academy Creek to 400 feet across 
the outer bar, extension of training wall in East River 
and construction of two spurdikes. 
Mar. 2, 1919 Channels 27 feet deep at mean low water over the 
bar and at Brunswick point; and 24 feet deet at 
mean low water in the inner harbor and provides 
for a cut from Academy Creek to Turtle River, if 
deemed advisable. 
July 3, 1930 A channel in Back River 230 feet deep and 150 feet wide. 
July 3, 1930 Increased Channel dimensions of the bar, Brunswick Point, 
East River, and Turtle River, as given in the then 
existing project. 
June 20, 1938 A 10-foot channel in Terry Creek. 
May 17, 1950 Increased channel dimensions of the bar, St. Simons 
Sound, Brunswick River, East River, and Turtle River, 
as given in the existing project. 
Oct. 22, 1976 Provides for Phase I AE&D studies for deepening portions 
of existing harbor (East River and Entrance Channel) and 
for provision of a navigation channel to Colonels Island. 
Oct. 17, 1986 Incorporated Georgia Port Authority's 30 foot by 8000 foot 
channel in South Brunswick River serving Colonel's 
Island into Brunswick Harbor Navigation Project 
HD 295, 53d Cong., 3d sess. 
HD 295, 53d Cong., 3d sess. 
HD 41, 52d Cong., 1st sess. 
HD 450, 58th Cong., 2d sess. 
HD 1236, 60th Cong., 2d sess. 
HD 581, 63d Cong., 2d sess. 
HD 1391, 62d Cong., 3d sess.' 
SD 178, 68th Cong., 2d sess. 
SD 43, 71st Cong., 2d sess.' 
Senate committee print, 74th 
Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 6, 75th Cong., 1st sess. 
HD 618, 75th Cong., 3d sess. 
HD 114, 77th Cong., 1st sess. 
Project authorized by 
Chief of Engineers under the 
Small Navigation Project 
Authority, Sec. 107, PL 
86-645 as amended. 
Annual Report, 1980, p.959 
HD 407, 59th Cong., 1st sess. 
HD 393,64th Cong., 1st sess. 
SD 57, 71st Cong., 2d sess.' 
SD 132, 71st Cong., 2d sess.' 
HD 690, 75th Cong., 3d sess.' 
HD 110, 81st Cong., 1st sess.' 
Report of Chief of Engineers 
dated Aug. 18, 1976. 
HR 6, 99th Cong. 2d sess. 
Section 846 
8-13 
Documents 
I I I L I C 
I - -- - _

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 8-B (continued) AUTHORIZING LEGISLATION 
See Date of 
Section Authorized 
in Text Act Project and Work Authorized Documents 
5. Mar. 2, 1907 
June 25, 1910 
July 25, 1912 
Aug. 8, 1917 
Jan. 21, 1927 
Jan. 21, 1927 
July 3, 1930 
Aug. 30, 1935 
Mar. 2, 1945 
Nov. 7, 1945 
July 24, 1946 
Sep. 3, 1954 
Oct. 23, 1962 
Oct 27, 1965 
SAVANNAH HARBOR, GA. 
Tentative provisions for a 26-foot channel from the 
Quarantine Station to the Seaboard Air Line Ry. Bridge 
Definite provision for the 26-foot channel. 
A 21-foot channel from the Seaboard Air Line Ry. Bridge 
to the foot of Kings Island. 
A 30-foot depth from the sea to the Quarantine Station. 
A 21-foot channel above Kings Island. 
Channel 30 feet deep, with general width 50 feet, from the 
ocean to the Quarantine Station, thence 26 feet deep, 
general width 400 feet, to the Seaboard Air Line Ry. Bridge, 
thence 21 feet deep and 300 feet wide to Kings Island. 
Widening at West Broad and Barnard Streets; anchorage 
basin; mooring dolphins; regulating dam across South 
Channel; relocation of the Inland Waterway; dredging 
Drakies Cut to 13 feet; widening to 525 ft. at Kings Island; 
extension of training walls, revetments, and jetties. 
Consolidation of projects relating to Savannah Harbor. 
Channel 26 feet deep and 300 feet wide from the Seaboard 
Air Line Ry. Bridge to the foot of Kings Island. 
Authorized the 30-foot project and eliminated from the project 
(a) the relating dam across South Channel; (b) the 
relocation of the Inland Waterway; and (c) the further 
extension of training walls, revetments, and jetties. 
Deepening the channel and turning basin above the Seaboard 
Air Line Ry. Bridge from 26 to 30 feet and widening 
the channel opposite the Atlantic Coast Line Terminals to a 
maximum of 550 feet for a length of 5,000 feet. 
Deepening the channels to 36 feet deep and 500 feet wide 
across the ocean bar; 34 feet deep and generally 400 feet 
wide, increased to 550 feet opposite the Atlantic Coast 
Line Terminals, with a turning basin 34 feet deep at the 
Mexican Petroleum Corp. Refinery; and with such modifi- 
Ecantgioinnese rths ereof as the Secretary of War and the Chief of may consider desirable. 
Extending channel 30 feet deep, 200 feet wide, upstream 
from Atlantic Creosoting Terminal to a point 1,500 feet 
below the Atlantic Coastal Highway Bridge, with turning 
basin 30 feet deep at upper end. 
Deepening the channel to 34 feet and widening to 400 feet 
from the upper end of the presently authorized 34-foot 
channel in the vicinity of the American Oil Company 
Refinery wharf, to the Savannah Sugar Refining Corp. 
with a turning basin at the upper end of the proposed 
improvement, made by widening the channel to 600 feet 
for a length of 700 feet and providing approaches. 
Enlargement of turning basin near Kings Island to a width 
of 900 feet and a length of 1,000 feet, with suitable 
approaches, at a depth of 34 feet. 
Deepening the bar channel from 36 feet to 40 feet, the 
channel between the bar channel and Garden City Terminal 
from 34 feet to 38 feet, and the channel from the Garden 
City Terminal to the vicinity of the Savannah Sugar Refining 
Corp., from 30 feet to 36 feet; widening the bar channel 
from 500 feet to 600 feet, the channel between Fort Pulaski 
and Atlantic Coast Line Terminal from 400 feet to 500 feet, 
and the channel between Garden City Terminal and the 
Savannah Sugar Refining Corp. from 200 feet to 400 feet; 
providing necessary wideners of the bends; constructing a 
new turning basin 900 feet wide by 1,000 feet long by 34 
feet deep opposite the Atlantic Coast Line Terminals; and 
enlargement of existing turning basin at the American Oil 
Company Terminal from 600 feet wide by 600 feet long to 
900 feet wide by 1,000 feet long. 
HD 181, 59th cong.,,lst less. 
HD 563, 62d Cong., 2d sess. 
HD 1471, 64th Cong., 2dsess. 
HD 261, 69th Cong., 1st sess. 
HD 262, 69th Cong., 1st sess. 
SD 39, 71st Cong., 1st sess. 
HD 276, 73d Cong., 2d sess. 
HD 283, 76th Cong., 1st sess.1 
HD 227, 79th Cong., 1stesess.1 
HD 678, 79th Cong., 2d sess.' 
HD 110, 83d Cong., 1st sess.' 
SD 115, 87th Cong., 2d sess. 
HD 226, 89th Cong., 1st sess. 
8-14

SAVANNAH, GA, DISTRICT 
TABLE 8-B (continued) AUTHORIZING LEGISLATION 
See Date of 
Section Authorized 
in Text Act Project and Work Authorized Documents 
Oct. 27, 1965 
SPWC Resolution 
June 15, 1976 
and HPWTC of 
June 9, 1976 
under authority 
of Sec. 201 of 
Flood Control 
Act of 1965 
Oct. 17 1986 
Sep. 19 1980 
June 25, 1910 
July 3, 1930 
Aug. 30, 1935 
Aug. 26, 1937 
May 17, 1950 
11. SPWC Resolution 
June 22, 1971 and 
HPWC of June 23, 
1972 under authority 
of Sec. 201 
of FC Act of 1965 
Oct. 17, 1986 
12. Water Resources 
Development Act 
of March 7, 1974. 
16A. Flood Control Act 
of Dec. 22, 1944 
Oct. 17, 1986 
January 1988 
16B. Flood Control Act 
of May 17, 1950. 
Flood Control Act 
of July 3, 1958. 
Water Resources 
Development Act 
of 1976. 
18C. Flood Control Act 
of Nov. 7, 1966. 
Water Resources 
Development Act 
of 1986 
Providing sediment control works consisting of tide 
gate structure across Back River; sediment basin 40 
eet deep, 600 feet wide about 2 miles long, with entrance 
channel 38 to 40 feet deep and 300 feet wide; drainage canal 
across Argyle Island 15 feet deep and 300 feet wide; control 
works and canals for supplying fresh water to Savannah 
National Wildlife Refuge; and facilities to mitigate damages 
to presently improved areas other than refuge lands. 
Provided for modification of the existing project to include 
(1) incorporation of the LASH Turning Basin as an 
element of the existing Federal navigation project for 
maintenance purposes, (2) enlargement of Kings Island 
Turning Basin to 1,500 feet by 1,600 feet by 38 feet. 
Savannah Harbor widening as described in Report of Chief of 
Engineers date Dec. 19,1978. Widen channel from 
400 feet to 500 feet between Kings Island Turning 
Basin and Fig Island Turning Basin. 
Allows planning, engineering and design to remove 
drift and debris as part of operations and maintenance 
SAVANNAH RIVER BELOW AUGUSTA, GA. 
For a 5-foot channel. 
Special improvement by bank protection work of 20 or 25 
miles of the river immediately below Augusta. 
The present 6-foot channel project and Lock and Dam. GA. 
Provision made for locating the lock and dam at New 
Savannah Bluff. 
Conditions of local cooperation modified. 
Provides for a 9-foot channel. 
TYBEE ISLAND, GA. 
Project will provide for beach erosion control, consisting 
of beach restoration, groin 
nourishment. 
Extends authority for renourishment with 
Federal participation from 15 to 50 years. 
BROADWAY LAKE, S.C. 
Provided for undertaking a demonstration project for the 
removal of silt and aquatic growth from Broadway Lake. 
J. STROM THURMOND DAM AND RESERVOIR 
Approved the general plan for the comprehensive development 
of the Savannah River Basin and provided for construction 
of the Project. 
Recreation and fish and wildlife added as project purposes. 
Name changed. (Formerly Clarks Hill Lake). 
HARTWELL LAKE, GA. AND S.C. 
Provided for construction of Hartwell Project. 
Provided for the completion of the Hartwell Project. 
Provides for installation of 5th unit. 
RICHARD B. RUSSELL DAM AND LAKE, GA. 
Provided for construction of the Trotters Shoals Project. 
Authorized mitigation plan. 
HD 223, 89th Cong., 1st sess. 
HD 94-520, 94th Cong. 
dated June 8, 1976. 
HD 6,99th Cong., 2d sess. 
Dated Oct 17, 1986 
Section 201 
Section 867 
HD 255, 51st Cong., 2d sess. 
& Annual Report, 1980 p.1328 
HD 962, 60th Cong., 1st sess. 
HD 101, 70th Cong., 1st sess. 
Senate Committee Print, 
73d Cong., 2d sess. 
Rivers and Harbors Comn., 
Doc. 39, 75th Cong., 1st sess. 
SD 6, 81st Cong., 1st sess. 
HD 105, 92d Cong. 
HR 699th Cong., 2d sess. 
Dated Oct 17, 1986 
Section 867 
PL 93-251, 93d Cong. 
HD 657, 78th Cong., 2d sess. 
PL 534, 78th Cong., 2d sess. 
HR 699th Cong., 2d sess. 
Section 864 
HJR 376 
HD 657, 78th Cong., 2d sess. 
PL 516, 81st Cong., 2d sess. 
PL 85-500, 85th Cong. 
2d sess. 
PL 94-587, Sec. 182b. 
85th Cong. 
SD 52, 89th Cong., 1st sess. 
HR 6 99th Cong., 2d sess. 
dated Oct. 17, 1986 
Section 601 
1C. otan laes pulihe mas -81-5- - --- ~IL~- .- I-- 
1. Contains latest published maps. 8-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 8-C OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 8 in text) 
For Last Cost to Sept. 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report for Construction Maintenance 
Aquatic Plant Control (R&H Act 1962) Completed 1968 $25,700- 
Bellville Point, GA Completed 1986 -- 
Cedar Point, GA Completed 1982 656,233- 
Darien Harbor, GA Completed 1975 199,723 185,433 
Fancy Bluff Creek, GA1 Completed 1935 8,000 7,200 
St. Marys River, GA and FL, and Completed 1951 15,688 69,936 
North River, GA 
Sapelo Harbor, GA 2'3 Completed 1929 17,906 19,594 
Satilla River, GA1'5 Completed 1951 9,452 57,172 
Savannah River above Augusta, GA2'3'4 See Notes 1929 69,600 5,870 
Savannah River at Augusta, GA 2'3'5 See Notes 1929 200,556 17,444 
1. Channel adequate for commerce. 5. Excludes $185,000 contributed funds ($172,151 
2. Project recommended for abandonment in for construction and $12,849 for operation and 
H.D. 467, 69th Cong., 1st sess. maintenance). 
3. No commerce reported. 6. Water Resources Development Act of 1986 
4. About84percentcompleted.Owingtoconstruction Authorized demonstration project on the Umbrella 
of two power dams which submerged much of the Creek - Dover Creek for the purpose of reducing 
work under the present and former projects, this shoaling. Monitor for 10 years, develop a hydrodyimprovement 
cannot be completed as originally namic model. 
planned. 
TABLE 8-D OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 14 In text) 
For Last Cost to Sept. 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report for Construction Maintenance 
Augusta, Savannah River, GA Completed 1941 $643,016 $38,242 
Curry Creek Dam and Lake, GA1 See Note 1974 - - 
Dunn Branch, Woodbine, Camden Completed 1977 132,640 5,219 
County, GA 
Macon, GA Completed 1955 380,043 38,243 
Oates Creek, GA Authorized N/A 2 - 
Peacock Creek, Liberty County, GA Completed 1976 582,163 5,219 
1. Feasibility report completed. Project not authorized 
for construction. 
2. Authorized by HR 6, Water Resource Development 
Act of 1986 dated Oct. 17, 1986. First Federal cost of 
$9,600,000 and non-federal cost of $4,100,000. 
8-16

SAVANNAH, GA, DISTRICT 
TABLE 8-E SAVANNAH RIVER BASIN, GA AND SC 
DAMS AND LAKES 
(See Section 16 In text) 
Estimated Cost 
Name River Federal Non-Federal Total 
J. Strom Thurmond Dam 
& Reservoir, GA and SC Savannah $79,156,0004 $79,156,0001' 
Hartwell, GA and SC Savannah 89,240,000 89,240,0002 
Goat island, GA and SCs Savannah 36,400,000 36,400,0003 
Middleton Shoals, GA and SCs Savannah 16,500,000 16,500,0003 
Chattooga Units (4), GA and SC Chattoga 41,700,000 41,700,0003 
Tallow Hill, GA Broad 39,000,000 39,000,0003 
Anthony Shoals, GA Broad 18,100,000 18,100,0003 
Newry-Old Pickens, SC6 Keowee 29,500,000 29,500,0003 
1. Final cost. (Excludes $127,000 for preauthorization 
stud2y.. ) Approved Aug. 1963. (Excludes $73,000 for preauthorization 
study.) 
3. Approved July 1954. 
4. Excludes Code 710 funds. 
5. Replaced by Richard B. Russell Dam and Lake 
(formerly Trotters Shoals Lake). 
6: Site of Duke Power Co. Keowee-Toxaway Project. 
8-17

JACKSONVILLE, FLA. DISTRICT * 
JACKSONVILLE, FLA. DISTRICT 
With the exception of a small area in the northeastern 
section of Florida, his district comprises a 
portion of south-central Georgia and all of peninsular 
Florida, embracing the watersheds tributary to 
the 
Atlantic Ocean and the Gulf of Mexico from, and including 
the harbor at Fernandina, Florida, to and including 
the Aucilla River. It also includes Puerto Rico 
and the Virgin Islands. 
IMPROVEMENTS 
Navigation P 
1. Aquatic Plant Control (R&H Act 
of 1965) ... ........................ 
2. Arecibo Harbor, PR................... 
3. Atlantic Intracoastal Waterway 
between Norfolk, Va. and St. 
Johns River, Fla...................... 
4. Bakers Haulover Inlet, Fla. ............ 
5. Canaveral Harbor, Fla ................ 
6. Channel from Naples to 
Big Marco Pass ..................... 
7. Charlotte Harbor, Fla. ................ 
8. Cross Florida Barge Canal ............. 
9. Eau Gallie Harbor, Fla................ 
10. Fernandina Harbor, Fla............... 
11. Fort Myers Beach, Fla................. 
12. Fort Pierce Harbor, Fla............... 
13. Intracoastal Waterway, Caloosahatchee 
River to Anclote River, Fla............ 
14. Intracoastal Waterway, Jacksonville 
to M iami, Fla ....................... 
15. Jacksonville Harbor, Fla............... 
16. Jacksonville Harbor (Mill Cove), Fla .... 
17. John's Pass, Fla ..................... 
18. Longboat Pass, Fla................... 
19. Manatee Harbor, Fla ................. 
20. Mayaguez Harbor, P.R................. 
21. Melbourne Harbor, Fla. ............... 
22. Miami Harbor, Fla .................. 
23. New Pass, Sarasota, Fla. .............. 
24. Okeechobee Waterway, Fla............. 
25. Oklawaha River, Fla.................. 
26. Palm Beach Harbor, Fla. .............. 
27. Ponce de Leon Inlet, Fla............... 
28. Ponce Harbor, P.R.................... 
29. Port Everglades Harbor, Fla........... 
30. Removal of Aquatic Growth From 
Navigable Waters in the State of Florida. 
31. St. Augustine Harbor, Fla ............. 
32. St. Johns River, Jacksonville to 
Lake Harney, Fla.................... 
33. St. Lucie Inlet, Fla................... 
34. San Juan Harbor, P.R... ............ 
35. Tampa Harbor, Fla................... 
age
22 
223 
3445556 
6
77
89
99 
10 
10 
10 
11 
11 
12 
12 
13 
13 
14 
14 
15 
15 
15 
16 
17 
Navigation (cont.) Page 
36. Navigation Projects on which 
Reconnaissance and Condition Surveys 
only were Conducted during Period ..... 18 
37. Other Authorized Navigation 
Projects ........................... 18 
38. Navigation Work under Special 
Authorization....................... 18 
Beach Erosion Control 
39. Brevard County, Fla.................. 18 
40. Broward County, Fla. Beach Etosion 
Control and Hillsboro Inlet, Fla., 
Navigation Project.................... 19 
41. Dade County, Fla .................... 19 
42. Dade County, N. of 
Haulover Beach, Fla.................. 20 
43. Duval County, Fla ................... 20 
44. Palm Beach County, Fla. from Martin 
Country line to Lake Worth Inlet and 
from South Lake Worth Inlet to 
Broward County line ................. 20 
45. Pinellas County, Fla.................. 21 
46. Other Authorized Beach Erosion 
Control Projects ..................... 21 
47. Beach Erosion Control Activities 
under Special Authorization............ 21 
Flood Control 
48. Central and Southern Florida .......... 22 
49. Four River Basins, Fla................. 23 
50. Portugues and Bucana Rivers, P.R....... 23 
51. Inspection of Completed Flood 
Control Projects ..................... 24 
52. Other Authorized Flood Control 
Projects ........................... 24 
53. Flood Control Work under Special 
Authorization ...................... . 24 
General Investigations 
54. Surveys............................ 24 
55. Collection and Study of Basic Data...... 24 
*All cost and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and 
also appear at the end of this chapter. 
9-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. AQUATIC PLANT CONTROL 
(R&H ACT OF 1965) 
Location. Navigable waters, tributary streams, 
connecting channels, and other allied waters in 
Florida. 
Existing project. The authorized project provides 
for control and progressive eradication of water hyacinth, 
alligatorweed, Eurasian water-milfoil, and 
other noxious aquatic plant growths from navigable 
waters, tributary streams, connecting channels, and 
other allied waters of the United States, in combined 
interest of navigation, flood control, drainage, 
agriculture, fish and wildlife conservation, public 
health, and related purposes, including continued 
research for development of most effective and economical 
control measures in cooperation with other 
Federal and State agencies in accordance with report 
of Chief of Engineers, House Document 251, 89th 
Congress, 1st session. The Water Resource Development 
Act of 1986 amends the R&H Act of 1965 and 
requires the local sponsor to share 50 percent of planning 
costs and 50 percent of research cost that are 
local in nature. The cost of research that is regional 
or national in scope shall be borne fully by the United 
States. 
Local cooperation. Local interests must hold the 
United States free from damages that may occur 
from operations performed in connection with this 
project and contribute 30 percent of cost of operations. 
Compliance with requirements of local cooperation 
is on schedule. 
Operations and results during fiscal year. New 
work: There were 12,411 acres of hyacinth and/or 
water lettuce, 6,305 acres of hydrilla and 1,201 acres 
of minor plant controlled during the period. Costs 
incurred for engineering and design and supervision 
and administration were $112,813 and $49,207, 
respectively, and $2,408,220 for operations. 
Condition at end of fiscal year. Operations by the 
Corps and the State of Florida are in progress, water 
hyacinths within Florida are under maintenance control. 
Hydrilla is continuing to spread throughout the 
state and is causing major problems in some areas. 
2. ARECIBO HARBOR, P. R. 
Location. The harbor is located on the north shore 
of Puerto Rico about 40 miles west of San Juan Harbor. 
(See NOAA Nautical Chart No. 25668.) 
Previous project. For details see page 504 of 1956 
Annual Report. 
Existing project. The project provides for a channel 
25 feet deep and 400 feet wide, with flare at entrance 
and widening at inner end to form a 
maneuvering area, and a stone breakwater 1,200 feet 
long. Place of reference is mean low water. Mean tidal 
range is 1.1 feet. (See Table 9-B for Authorizing 
Legislation.) 
Local cooperation. Fully complied with to date. 
Non Federal contribution for new work was 
$288,000. 
Terminal facilities. A bulkhead wharf 688 by 220 
feet providing a deep water berthing space of approximately 
500 feet, and a 300 by 100 foot transit shed. 
Facilities are considered adequate for existing 
commerce. 
Operations and results during fiscal year. Maintenance: 
Condition and operation studies for the year 
cost $433. Supervision and administration costs were 
$33. 
Condition at end of fiscal year. Project was completed 
in 1944. Breakwater was repaired in 1952. 
Wave action has since caused damage. Total Federal 
costs under existing project through September 30, 
1987 were $1,128,075 for new work and $4,286,698 
for maintenance, a total of $5,414,773. 
3. ATLANTIC INTRACOASTAL WATERWAY 
BETWEEN NORFOLK, VA. AND ST. 
JOHNS RIVER, FLA. (JACKSONVILLE 
DISTRICT) 
Location. That part of Intracoastal Waterway between 
southerly limit of Fernandina Harbor, Florida, 
at junction of Lanceford Creek and Amelia River, 
and St. Johns River, Fla. (See NOAA Nautical Chart 
No. 11489.) 
Previous project. For Details see page 605 of 1938 
Annual Report. 
Existing project. Channel 12, 90 to 150 feet wide 
from Fernandina Harbor to St. Johns River about 
22 miles long. Plane of reference is mean low water. 
Mean tidal range is 6 feet at Fernandina and 3.8 feet 
at St. Johns River. (See Table 9-B for Authorizing 
Legislation.) 
Existing project was authorized by River and Harbor 
Acts of 1913 (HD 898/62/2) and 1938 (HD 
618/75/3). 
Local cooperation. Fully complied with to date. 
Terminal facilities. There is a commercial marina 
located at Sisters Creek. No other facilities exist 
along this section of the waterway and none are currently 
reqtuired. 
Operations and results during fiscal year. None. 
Condition at end of fiscal year. Project was completed 
in 1941. Total costs under the existing project 
to September 30, 1987, have been $263,659 for 
new work and $5,300,742 for maintenance, a total 
of $5,564,401. 
9-2

JACKSONVILLE, FLA. DISTRICT 
4. BAKERS HAULOVER INLET, FLA. 
Location. The Harbor connects the Intracoastal 
Waterway and the Atlantic Ocean and is located 2 
miles north of Miami Beach in Dade County, Florida. 
Existing project. The authorized project provides 
for an entrance channel 11x200 feet, thence 8x100 
feet to the Intracoastal Waterway, and a marina basin 
8x200 feet. The length of the project is 1.02 miles. 
Plane of reference is mean low water. 
Operations and results during fiscal year. None. 
Condition at end of fiscal year. The project was 
completed in December 1964. Project depths have 
been restored. 
5. CANAVERAL HARBOR, FLA. 
Location. The harbor is located on the east coast 
of Florida in Canaveral Bight, about 146 miles south 
of the entrance to Jacksonville Harbor and 69 miles 
north of the entrance to Fort Pierce Harbor. (See 
NOAA Nautical Chart Nos. 11478 and 11484.) 
Existing project. The authorized project provides 
for maintenance of the 44-foot-deep entrance channel 
and 35-foot-depth turning basin; construction and 
operation of a sand transfer plant; relocation of the 
perimeter dike about 4,000 feet westward and extension 
of the harbor westward; two entrance jetties 100 
feet long (constructed of native stone core and 
granite sides and cap); a lock; a channel and turning 
basin 31 feet deep near the relocated dike; and a 
barge canal 12 by 125 feet from the turning basin 
to the Atlantic Intracoastal Waterway. Plane of reference 
is mean low water (ocean) for harbor dike and 
lock, and mean low water (Banana River) for barge 
canal. The project is about 11.5 miles long. 
Mean tidal range is 3.5 feet at the entrance and 
practically non-tidal in Banana and Indian Rivers. 
(See Table 9-C for Data Relative to Lock.) 
Estimated cost (Oct. 1984 price levels) of the 1962 
modification to the project is $16,900,000 Federal 
cost and $4,436,000 non-Federal cost ($138,000 contributed 
funds and $4,298,000 other costs); $700,000 
costs to NASA and $85,000 costs to U.S. Coast 
Guard. (See Table 9-B for Authorizing Legislation.) 
Local cooperation. Local interests must: provide 
all lands, rights-of-way, spoil-disposal areas, retaining 
dikes, and embankments; hold United States free 
from damages; provide and maintain four-lane bridge 
and roadway subject to Federal contribution of 65.3 
percent of cost of constructing bridge and 51.2 percent 
of constructing roadway; provide public terminal 
and transfer facilities; and make alterations as 
required in berthing facilities. For further details see 
Senate Document 140, 87th Congress, 2d session. 
Non-Federal contribution for new work is $1,106,000. 
Terminal facilities. Canaveral Harbor has 27 commercial 
waterfront facilities. The General Cargo Facilities 
consist of 1,900 feet of usable berthing space 
and 5 transit sheds with a total shed storage space 
capacity of 168,000 square feet. The Oil Handling Facilities 
operate with 3,760 feet of usable berthing 
space and 22 storage tanks providing a total of 
1,195,620 barrels of tank storage. Available warehouse 
storage includes 28,000 square feet of dry 
storage and 2,500,000 cubic feet of cold storage. Two 
hundred sixty-six acres of open storage is also 
available. 
Two cruise ship berths totaling 1200 feet long by 
41-foot depth and two 8800 square foot cruise terminals 
are also located on the south side. The western 
cruise ship berth is equipped with a roll on/off ramp 
and is adjacent to 20 acres of trailer storage area. 
Hoisting facilities consist of one 45-ton floating 
crane and crawler and mobile cranes, with capacities 
from 70 to 200 tons, available from local crane rental 
services. There are two water-front marine repair 
facilities with the nearest drydock facilities located 
at Port Everglades and Jacksonville. Two tugs with 
ratings of 1,600 and 2,250 horsepower are also available. 
There is no rail service available at the port. 
The nearest rail service is the Florida East Coast 
Railway located 9 miles away. 
Facilities are considered adequate for existing 
commerce. (See Port Series #16, Rev. 1982.) 
Operations and results during fiscal year. New 
Work: Harbor extension contract underway at a cost 
of $2,620,923. Engineering and design and supervision 
and administration costs were $183,020 and 
$116,574, respectively. 
Maintenance: Maintenance and operation of locks 
amounted to $302,296 for the fiscal year. District 
Communications Network cost was $36,250. Natural 
resource management cost $3,271. Condition and 
operation studies cost $92,159. Energy conservation 
was $3,058, and real estate management was $426. 
Continuing contracts from FY 86 for maintenance 
dredging of the entrance channel, the inner channel 
and the barge channel were all completed in FY 87 
at a total cost of $292,392. Engineering and design 
and supervision and administration costs were 
$122,585 and $175,698 respectively. 
Condition at end of fiscal year. The existing project 
is about 86 percent completed. The perimeter 
dike and jetties are in good condition. 
Work remaining to complete the project is completion 
of the harbor extension and construction of 
the sand transfer plant. 
6. CHANNEL FROM NAPLES TO 
BIG MARCO PASS, FLA. 
Location. Naples Bay is on the southwestern side 
of the Florida peninsula about 35 miles south of the 
mouth of the Caloosahatchee River and ap- 
9-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
proximately 1 mile inland and parallel to the Gulf of 
Mexico coastline. (See NOAA Nautical Chart No. 
11430.) 
Existing project. The authorized project provides 
for an interior channel 6 by 70 feet from Naples to 
Big Marco Pass; a channel 12 by 150 feet from the 
Gulf of Mexico to Gordon Pass, thence 10 by 100-70 
feet to a 10-foot-depth turning basin in the upper Naples 
Bay; and an 8-foot-depth turning basin at the 
municipal yacht basin. Plane of reference is mean low 
water. Mean tidal range is 2.1 feet. (See Table 9-B 
for Authorizing Legislation.) 
For further details see Annual Report of 1962. 
Local cooperation. Fully complied with to date. 
Contributed funds for new work were $159,975. 
Terminal facilities. Four seafood packing houses, 
4 marine repair yards; a municipal pier and basin for 
use by recreational boats; and numerous private piers 
and slips for both commercial and recreational craft 
are available. Facilities are considered adequate for 
existing commerce. 
Operations and results during fiscal year. None. 
Condition at end of fiscal year. The project is 
complete. 
7. CHARLOTTE HARBOR, FLA. 
Location. The Harbor is located on the west coast 
of Florida about 68 miles south of the entrance to 
Tampa Bay and 150 miles north of Key West. (See 
NOAA Nautical Chart No. 11429.) 
Previous projects. For details, see page 457 of 1959 
Annual Report. 
Existing project. The authorized project provides 
for a channel 32 by 300 feet, increased to 700 feet 
at the bend, from the Gulf of Mexico to Port Boca 
Grande, thence 10 by 100 feet from deep water at 
Port Boca Grande to and including a turning basin 
200 feet square at the municipal terminal at Punta 
Gorda. Plane of reference is mean low water. The 
project is about 29.5 miles long. 
Mean tidal range is one foot at Port Boca Grande 
and 1.4 feet at Punta Gorda. Extreme range is about 
3 feet at Port Boca Grande and 3.8 feet at Punta Gorda. 
Strong southwesterly winds raise water level 
about 1.5 feet; strong northerly and easterly winds 
lower it about one foot. (See Table 9-B for Authorizing 
Legislation.) 
Local cooperation. Local cooperation is fully complied 
with to date. Non-Federal contribution for new 
work was $15,563. 
Terminal facilities. Existing facilities consist of a 
phosphate wharf at Port Boca Grande and a 
municipal earthfill pier about 850 feet long at Punta 
Gorda, both open to the public. Railway connections 
are available at Port Boca Grande, and highway 
and railway connections are available at Punta Gorda. 
There is a tank farm at Port Boca Grande for storage 
and rehandling of bunker fuel oil and numerous facilities 
are available in the area for docking and servicing 
small craft. Facilities are considered adequate 
for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Dredging amounted to $-39,426. Condition 
and operation studies cost $47,303. District communications 
network costs were $13,000. Engineering 
and design and supervision and administration costs 
were $12,030 and $9,849, respectively. 
Condition at end of fiscal year. The project was 
completed in 1959. 
Ibtal costs under existing project through September 
30, 1987, have been $533,169 for new work and 
$11,530,739 for maintenance, a total of $12,063,908. 
In addition, $15,563 was expended from contributed 
funds for new work in Boca Grande entrance 
channel. 
8. CROSS FLORIDA BARGE CANAL 
Location. The proposed canal extends up the St. 
Johns River, past Palatka, thence up the valley of the 
Oklawaha River across the divide south of Ocala, and 
down the valley of the Withlacoochee River to the 
Gulf of Mexico, about 95 miles north of Tampa, 
Florida. 
Existing project. The authorized project provides 
for a lock canal with project depth of 12 feet and a 
minimum bottom width of 150 feet, with five locks 
and two earth dams. Project including the section in 
the St. Johns River is 184 miles long. (See Table 9D 
for Locks and Dams.) 
Operation and maintenance of the locks and dams 
is a Federal responsibility. Estimated cost of new 
work (1970) is $179,000,000 Federal, and $19,500,000 
non-Federal for lands, rights-of-way, and other costs. 
(See Table 9-B for Authorizing Legislation.) 
Local cooperation. Local interests must furnish 
lands and rights-of-way for construction of canal; hold 
the United States free from damages; and operate 
and maintain all highway bridges and roadways built 
in connection with project. 
Terminal facilities. None. 
Operations and results during fiscal year. (See Table 
9-E for work accomplished.) 
Regulation. 
a. Lake Ocklawaha. During the period the lake 
continued to be regulated at 18.0 feet, NGVD by discharging 
through the Rodman spillway. 
b. Lake Rousseau. During the period, the lake continued 
to be regulated at 27.5 ft., NGVD by discharging 
through the Inglis Main and Bypass Spillways. 
Condition at end of fiscal year. Construction of pro- 
9-4

JACKSONVILLE, FLA. DISTRICT 
ject commenced February 25, 1964, and is 36 percent 
completed. Inglis Lock, Dam, and Spillway; Rodman 
Dam and Spillway, Eureka Lock, Dam, and 
Spillway; Henry H. Buckman Lock; and canal from 
Palatka to Lake Ocklawaha and from Withlacoochee 
River to Gulf of Mexico, including Inglis Bypass 
Channel, are completed. Construction work on the 
project was terminated in FY 1971 by order of the 
President. A restudy report and environmental impact 
statement were completed in February 1977. 
9. EAU GALLIE HARBOR, FLA. 
Location. The Harbor is located on Indian River 
about midway of the State of Florida, 176 miles south 
of Jacksonville Harbor and 174 miles north of Miami 
Harbor. 
Existing project. The authorized project provides 
for a channel 8 x 100 feet from Indian River to and 
including a 300 x 600-foot turning basin in Eau Gallie. 
The project is about 2,700 feet long. Plane of 
reference is mean low water. The harbor is almost 
nontidal. 
Local cooperation. Fully complied with to date. 
Terminal facilities. A privately owned boatyard in 
Eau Gallie Harbor provides more than 600 feet of 
docking space used chiefly by pleasure boats. There 
are also two marine railways and repair and storage 
facilities available. The facilities are considered adequate 
for the present needs of navigation. 
Operations and results during fiscal year. None. 
Condition at end of fiscal year. The project was 
completed in 1939. In December 1982, the controlling 
depth of the channel was 5 feet. 
10. FERNANDINA HARBOR, FLA. 
Location. Entrance to the harbor is located on the 
northeast coast of Florida about 95 miles south of 
the entrance to Savannah Harbor, Georgia, and 22 
miles north of the entrance to Jacksonville Harbor, 
Florida. (See NOAA Nautical Chart No. 11503.) 
Existing project. The authorized project provides 
for a 32-foot-depth channel (maximum channel in active 
status: 28 feet) generally 300-400 feet wide from 
deep water in the ocean to the junction of Lanceford 
Creek with Amelia River; an 800-foot-wide turning 
basin at the first bend below Lanceford Creek; and 
two jetties, 19,150 and 11,200 feet long. Plane of 
reference is mean low water. The project is 7 miles 
long. Mean tidal range is 5.8 feet on the bar and 6 
feet in the inner harbor. (See Table 9-B for Authorizing 
Legislation.) 
Local cooperation. Fully complied with to date. 
Non-federal contribution for new work was $812,000. 
Terminal facilities. There are two large wharves 
operated by industrial plants; twelve wharves serving 
fishing boats, recreational craft, and other vessels; 
three oil handling wharves with pipelines; and 
a Municipal Marina and Sportsman's Wharf with 
public facilities for small craft. Total berthing space 
is approximately 4,065 feet. Most terminals are served 
by rail, and all have highway access. Facilities are 
considered adequate for existing commerce. (See 
Port Series No. 16 (Part 2), 1964.) 
Operations and results during fiscal year. New 
work: Engineering and design and supervision and 
administration costs were $39,511 and $8,169 respectively. 
Maintenance: Condition and operation studies cost 
$104,728. District communications network costs 
were $18,000. Real estate management costs $3,523. 
Engineering and design costs were $17,126. 
Condition at end of fiscal year. The active portion 
of the existing project is complete. Jetties are in poor 
condition and are badly in need of repair. Remaining 
work is to deepen the inner harbor channel and 
turning basin to 32 feet when and if the presently 
inactive 1950 authorization is reactivated. The entrance 
channel has been deepened to 40 feet for the 
Kings Bay project. 
11. FORT MYERS BEACH, FLA. 
Location. Fort Myers Beach is on Estero Island 
near the mouth of the Caloosahatchee River, about 
20 miles below Fort Myers and 110 miles south of 
Tampa, Florida. (See NOAA Nautical Chart No. 
11427.) 
Existing project. The authorized project provides 
for a channel 12 by 150 feet from that depth in San 
Carlos Bay into Matanzas Pass, thence 11 by 125 feet 
in Matanzas Pass to and including a turning basin 
2,000 feet upstream from the upper shrimp terminals. 
Plane of reference is mean low water. Project 
is 2.5 miles long. 
Mean tidal range is 1.7 feet. Spring range is about 
2.3 feet. Strong northerly winds lower the water surface 
1 to 2 feet; strong southerly winds have an opposite 
effect. (See Table 9-B for Authorizing 
Legislation.) 
Local cooperation. Fully complied with to date. 
Non-Federal contribution for new work was $1,095. 
Terminal facilities. There are three shrimppacking 
houses and several fish-packing houses, two 
marine railways, a fuel terminal and an ice manufacturing 
plant in the area. There are several commercial 
facilities for servicing shrimp boats. 
Recreationalcraft facilities include nine marinas, a 
boat motor testing laboratory which is closed, and 
numerous privately owned piers and wharves. All 
terminals have highway access. Facilities are considered 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Condition and operation studies cost 
9-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
$80,629. Dredging cost $260. Engineering and design 
and supervision and administration costs were 
$2,303 and $117 respectively. 
Condition at end of fiscal year. The project is 
complete. 
12. FORT PIERCE HARBOR, FLA. 
Location. On east coast of Florida, about 218 miles 
south of entrance to St. Johns River and about 124 
miles north of entrance to Miami Harbor. (See NOAA 
Nautical Chart No. 11475.) 
Existing project. A channel 350 feet wide at the 
27-foot contour in the ocean, tapering to a width of 
200 feet at Sta. 100+00, thence 200 feet wide to Sta. 
30+00, and thence flaring to a turning basin 900 feet 
wide. Entrance channel is 27 feet deep to Sta. 
130+00 and thence 25 feet deep to and including the 
turning basin. Project includes the maintenance of 
two jetties and shore revetments at the inlet. Length 
of project is about 3.5 miles. 
Mean tidal range is 2.6 feet at the entrance and 
0.7 foot at terminals. (See Table 9-B for Authorizing 
Legislation.) 
For further details see 1961 Annual Report. 
Local Cooperation. Fully complied with to date. 
Non-Federal contribution for new work was $18,574. 
Terminal facilities. Two earth-filled piers forming 
a slip 200 feet by 300 feet, with bulkhead wharf at 
inner end, affording berthing space of about 1,653 
feet. The south pier and bulkhead wharf are 
municipally owned. Facilities also include a cooling 
plant, a warehouse and a fruit packing house. The 
north pier is served by railway and both piers by highway 
connections. North of the turning basin local interests 
have provided deep-draft berthing and pier 
facilities. Also available is a bulkhead wharf with a 
depth of 25 feet with ample room for open storage 
and with tank storage for petroleum in the rear. Facilities 
are considered adequate for existing 
commerce. 
Operations and results during fiscal year. New 
Work: Engineering and design and supervision and 
administration costs were $57,816 and $10,548, 
respectively. 
Maintenance: Maintenance dredging costs were 
$350,099 and condition and operation studies were 
$22,500, Engineering and design costs and supervision 
and administration costs were $4,126 and 
$25,030 respectively. 
Condition at end of fiscal year. The project was 
completed in 1938 except for the fishing walkway 
atop the south jetty which was completed by local 
interests in 1968. Local interests installed lighting 
atop the jetty in 1969. 
The south jetty and revetments are in good condition. 
The north jetty is scheduled for repair in FY 86. 
13. INTRACOASTAL WATERWAY, CALOOSAHATCHEE 
RIVER TO ANCLOTE 
RIVER, FLA. 
Location. The Waterway extends from the mouth 
of the Caloosahatchee River at Punta Rassa, Florida, 
to the mouth of Anclote River, Florida, following 
in general an almost continuous series of 
protected inside waterways along the gulf coast of 
Florida. (See NOAA Nautical Charts Nos. 11411, 
11425 and 11427.) 
Previous projects. For details see page 767 of 1945 
Annual Report. 
Existing project. The authorized project provides 
for a channel 9 by 100 feet from Caloosahatchee 
River to Anclote River; deepening the existing channel 
at Caseys Pass to 9 feet; a channel 6 by 80 feet 
(Cats Point Channel) along the southeastern side of 
Boca Ciega Bay past Frenchman Creek and Gulfport; 
maintenance of bulkheads, revetments, and two jetties 
built at Caseys Pass under previous project; and 
improvement and maintenance of Sunshine Skyway 
Channel. Plane of reference is mean low water. The 
project includes about 160 miles of channels. 
Mean ranges of tide are 1.7 feet at Punta Rassa, 
1 foot at Port Boca Grande, 1.4 feet in Tampa Bay 
at Anna Maria, and 2 feet at entrance to Anclote 
River. Extreme ranges are about 4.5 feet at Punta 
Rassa, about 3 to 4 feet between Port Boca Grande 
and Corey Causeway over Boca Ciega Bay, and about 
5.5 feet at entrance to Anclote River. Southerly 
winds over the area generally raise water level by 1 
to 1.5 feet; northerly winds lower water level by 1 
to 2 feet. (See Table 9-B for Authorizing Legislation.) 
Local cooperation. Fully complied with to date. 
Non-Federal contribution for new work was $14,473. 
Terminal facilities. Existing facilities include one 
municipal concrete pier, one railway pier, one freight 
wharf, one marginal wharf 500 feet long on terminal 
island, and eleven privately owned landings, all 
at Sarasota. Municipal pier and freight wharf are 
open to the public. All piers have highway connections. 
There are six wharves along Boca Ciega Bay 
and a number of small privately owned piers and 
wharves at various points along waterway for use of 
commercial fishing boats and recreational craft. Facilities 
are considered adequate for existing 
commerce. 
Operations and results during fiscal year. Maintenance: 
Maintenance of channel slopes and berms 
cost $12,570. Real estate audits and administration 
costs were $9,719. Acquisition costs were $3,585. 
Bridge maintenance costs were $-589. District communications 
network cost $21,000. Condition and 
operations studies cost $53,139. Supervision and administration 
costs were $400. 
Condition at end of fiscal year. Existing project 
9-6

JACKSONVILLE, FLA. DISTRICT 
is complete. A contract to maintain the jetties at 
Casey's Pass was completed in 1983. 
Tobtal Federal costs under existing project through 
September 30, 1987 were $7,597,078 for new work 
and $5,526,631 for maintenance, a total of 
$13,123,709. In addition, $14,473 contributed funds 
were expended for Sunshine Skyway and Boca Ciega 
Bay channels. 
14. INTRACOASTAL WATERWAY, JACKSONVILLE 
TO MIAMI, FLA. 
Location. The waterway extends from Jacksonville 
to Miami, Florida, following the St. Johns River to 
the mouth of Pablo Creek and thence following in 
general an almost continuous series of protected inside 
waterways along the Atlantic coast of Florida 
to Miami. (NOAA Nautical Chart Nos. 11489, 11485, 
11472 and 11467.) 
Previous projects. For details, see pages 618-619 
of 1938 Annual Report. 
Existing project. The authorized project provides 
for a channel 12 by 125 feet from Jacksonville to Miami, 
modified to 10-foot-depth from Fort Pierce to 
Miami by Chief of Engineer's report of July 22, 1960; 
side channels at Sebastian and Daytona Beach and 
turning basins at Sebastian and Vero Beach, all to 
an 8-foot-depth; and operation and maintenance of 
the Palm Valley highway bridge. Project is 370 miles 
long, including 21 miles in Jacksonville Harbor. Mean 
range of the tide is 3.8 feet at St. Johns River, 0.7 
foot in the Indian River at Fort Pierce, 1.8 feet in 
Lake Worth at Port of Palm Beach terminals, 2.3 feet 
at the Port Everglades terminals, and 2 feet in Biscayne 
Bay. The extreme range is about 7 feet at St. 
Johns River, 1.5 feet at Fort Pierce, and 3 feet in Biscayne 
Bay. Plane of reference is mean low water. Tidal 
effect is imperceptible at points along waterway 
distant from inlets. (See Table 9-B for Authorizing 
Legislation.) 
Local cooperation. Fully complied with to date. 
Terminal facilities. There are a number of privately 
owned piers, wharves, and landings at various 
points along waterway. Terminals with railway connections 
are available at Jacksonville, Fort Pierce, 
West Palm Beach, Port Everglades, and Miami. 
Municipal piers or wharves have been constructed 
at Titusville, Cocoa, Melbourne, and Vero Beach for 
handling general freight and at St. Augustine, Daytona 
Beach, New Smyrna Beach, Eau Gallie, West 
Palm Beach, Delray Beach, Fort Lauderdale, and Miami 
for use of recreational craft. Yacht basins, open 
to the public, have been provided at Jacksonville 
Beach, Daytona Beach, Titusville, Eau Gallie, Vero 
Beach, Fort Pierce, West Palm Beach, Fort Lauderdale, 
Hollywood, and Miami. Facilities are considered 
adequate for existing commerce. (For further details 
on facilities at Jacksonville, see Port Series No. 15, 
1969, and at Palm Beach, Port Everglades, and Miami, 
see Port Series No. 16, Revised 1972.) 
Operations and results during fiscal year. Maintenance: 
The cost for maintenance dredging in FY 
87 was $2,617,820. The district communications network 
cost was $26,900 and permanent operating 
equipment was $2,073. Condition and operation 
studies cost was $74,060. Real estate management 
was $54,656. Engineering and design and supervision 
and administration costs were $33,891 and 
$162,622 respectively. The highway bridge near Palm 
Valley was operated and maintained at a cost of 
$121,147. 
Condition at end of fiscal year. The existing project 
as modified by the Chief of Engineers is complete 
except for construction of the channel and 
turning basin at Sebastian, Florida, which is in an 
inactive status. 
Total Federal costs under existing project through 
September 30, 1987, were $19,156,822 for new work: 
$29,287,386 for maintenance, a total of $48,444,208 
regular funds. In addition, $2,199,842 has been expended 
from public works funds for new work. 
15. JACKSONVILLE HARBOR, FLA. 
Location. The authorized project comprises the 
lower 24.9 miles of St. Johns River which empties 
into the Atlantic Ocean near the northeasterly corner 
of the Florida peninsula. (See NOAA Nautical 
Chart No. 11491.) 
Previous projects. For details, see page 607 of Annual 
Report, 1938. 
Existing project. The authorized project provides 
for a channel 38 by 400-1,200 feet from the ocean 
to mile 20 via Dame Point-Fulton Cutoff, thence 34 
feet to Commodore Point, and thence 30 feet deep 
to the F.E.C. Railway bridge at Jacksonville, including 
a 30 foot channel in Arlington Cut and in the 
Old Dame Point-Fulton Channel; maintenance of 
the existing 42 and 40-foot-depth entrance channel; 
maintenance of jetties at channel entrance; and construction 
of training walls and revetments. Plane of 
reference is mean low water. The project is about 26.8 
miles long. 
Mean tidal range is 5.3 feet on the bar, 4.9 feet at 
Mayport, 2.6 feet at Dame Point, and 1.1 feet at Jacksonville. 
The extreme range varies from about 9 feet 
on the bar to about 1.5 feet at Jacksonville. Strong 
northeasterly winds raise the water level about 2 feet 
at Mayport and Jacksonville. Strong southwesterly 
winds lower the water about 1.5 feet at Mayport and 
1 foot at Jacksonville. (See Table 9-B for Authorizing 
Legislation.) 
Local cooperation. Local interests have fully complied 
with requirements of local cooperation for work 
performed to date. For work authorized by the 1965 
9-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
River and Harbor Act, local interests were required 
to contribute 2.6 percent of the contract price plus 
supervision and administration for work provided by 
the Corps; provide all lands and rights-of-way; save 
the United States free from damages; and provide 
and maintain public terminal and transfer facilities. 
Assurances of local cooperation for this work were 
accepted February 11, 1966. 
Terminal facilities. Jacksonville Harbor has 84 
waterfront facilities. Available at the General Cargo 
Facilities are 11,140 feet of usable berthing space and 
12 transit sheds with a total storage space of 
1,009,800 square feet. The Oil Handling Facilities 
consist of 7,843 feet of usable berthing space and 179 
storage tanks providing a total of 8,478,900 barrels 
of tank storage. Warehouse storage at the port includes 
3,266,900 square feet of dry storage and 
4,071,100 cubic feet of cold storage. Available open 
storage is 223 acres. 
Four fixed cranes with capacities from 40 to 100 
tons are located at the port. Available locally are 
crawler and truck cranes with capacities up to 100 
tones. Various phases of marine repair work are accomplished 
by 7 waterfront repair facilities and 
numerous other companies located offwater. Drydock 
facilities consist of 6 floating drydocks with capacities 
from 800 to 33,000 tons. Floating equipment includes 
25 tugs with up to 3,300 horsepower and 16 
tank barges with capacities up to 20,700 barrels. 
Three major railroads furnish rail service from port 
docks to all points outside of Jacksonville. 
Facilities are considered adequate for existing 
commerce. (See Port Series #15, Rev. 1978.) 
Operations and results during fiscal year. New 
work: Supervision and administration cost was 
$378,927. 
Maintenance: Operation and maintenance of district 
communications network cost $18,000. Condition 
and operation studies cost $144,918. Real 
estate management $15,931. Acquisition costs were 
$8,057. Maintenance dredging costs were $3,497,653. 
Engineering and design and supervision and administration 
costs were $97,329 and $176,910, 
respectively. 
Condition at end of fiscal year. Construction of the 
modification to the project, authorized by 1965 River 
and Harbor Act, is completed. The north jetty is in 
fair condition and partially submerged at high tide. 
The south jetty was repaired in FY 1985 to prevent 
further damage to the Mayport Naval Station. Revetments 
and retaining walls were in poor condition. 
'Ttal Federal costs under existing project through 
September 30, 1987, were $44,165,055 for new work, 
$58,909,727 for maintenance a total of $103,074,782 
regular funds. In addition $290,013 has been expended 
from public works funds for new work. 
16. JACKSONVILLE HARBOR (MILL 
COVE), FLA. 
Location. The authorized project comprises the upper 
6 square miles of the Upper St. Johns River near 
the Jacksonville Harbor which empties into the Atlantic 
Ocean near the northeasterly corner of the 
Florida peninsula. (See NOAA Nautical Chart No. 
11491). 
Previous project. None. 
Existing project. The authorized project provides 
for a channel 38 feet deep by 400-1,200 feet wide 
from ocean to mile 20 via Dame Point-Fulton Cutoff, 
thence 34 feet to Commodore Point, and thence 30 
feet deep to the FEC railway bridge at Jacksonville, 
including a 30-foot channel in Arlington cut and in 
the old Dame Point-Fulton channel; maintenance of 
the existing 42 and 40 foot depth entrance channel; 
widening of channel by 100 feet near mile 5 and by 
200 feet near mile 7; maintenance of jetties at channel 
entrance; construction of training walls and revetments; 
a navigation and floodway channel 26x200 
feet along south side of Commodore Point: on approach 
and mooring basin 20 feet deep, 1,300 feet 
long at 20 foot depth contour and 600 feet long at 
pierhead line near Naval Reserve Armory in south 
Jacksonville; a depth of 24 feet between that depth 
contour and the pierhead line from Hogan Creek to 
the foot of Laura St.; and a depth of 28 feet to within 
60 feet of pierhead line between foot of Laura 
St. and St. Elmo W. Acosta (formerly Upper State) 
bridge. Length of project is about 26.8 miles. In addition 
the Navy has provided funds for a deeper Jax 
Harbor entrance channel 42 feet deep and 800 long. 
Intersecting with the Navy's Mayport entrance channel 
to the Mayport Trning basin also an extension 
of the existing project to provide 38 foot depth at 
the Navy fuel depot, Drummond Creek. 
Mean tidal range is 4.9 feet at entrance, 4.5 feet 
at Mayport, 3.0 feet at Dame Point, and 1.2 feet at 
Jacksonville. Strong northeasterly winds raise the 
water level about 2 feet at Mayport and Jacksonville. 
Strong southwesterly winds lower the water about 
1.5 feet at Mayport and 1 foot at Jacksonville (See 
Table 9-B for authorizing legislation.) 
Cost estimate for new work (Oct. 1987 price levels) 
was $4,160,000 Federal and $0 non-Federal cash 
contribution. 
Local cooperation. In conformance with Section 
221, Public Law 91-611, and prior to commencement 
of construction, the Jacksonville Port Authority, as 
local sponsor, must provide written agreement to the 
following local cooperation requirements: provide 
without cost to the United States all lands, easements, 
and rights-of-way required for construction 
and subsequent maintenance of the project; hold and 
save the United States free from damages that may 
result due to construction and maintenance other 
9-8

JACKSONVILLE, FLA. DISTRICT 
than damages due to the fault or negligence of the 
United States or its contractors; accomplish without 
cost to the United States such utility and other relocations 
or alterations as necessary for construction. 
Terminal facilities. None. 
Operations and results during fiscal year. New 
work: Engineering and design and supervision and 
administrations cost were $136,661 and $12,195, 
respectively. 
Maintenance: None. 
Condition at end of fiscal year. ToIbtal cost under 
existing project through September 30, 1987 were 
$148,856 Federal funds and $0 contributed funds for 
new work and $0 for maintenance, a total of 
$148,856. 
17. JOHNS PASS, FLA. 
Location. A natural inlet on the west coast of Florida 
connecting Boca Ciega Bay with Gulf of Mexico. 
The pass is located about 8 miles northwest of lower 
Tampa Bay directly across Boca Ciega Bay from St. 
Petersburg, Fla. (See NOAA Nautical Chart No. 
11411.) 
Existing project. Channel 10 by 150 feet in the 
gulf, thence 8 by 100 feet inside pass, and 6 by 100 
feet to the Intracoastal Waterway, and suitable protective 
measures over a frontage of approximately 
one thousand linear feet of shore along the north end 
of Treasure Island. Plane of reference is mean low 
water. Mean range of tide is 1.5 feet. Project is about 
2.6 miles long. 
Project was authorized December 2, 1964 by Chief 
of Engineers under Section 107 of the 1960 River 
and Harbor Act and by Section 110 of the 1966 River 
and Harbor Act. 
Local cooperation. Fully complied with to date. 
Non-Federal contribution for new work was $53,732. 
Terminal facilities. Only small marinas and repair 
yards for recreational craft in the general vicinity. 
Facilities are considered adequate for existing 
commerce. 
Operations and results during fiscal year. Maintenance: 
None. 
Condition at end of fiscal year. Project was completed 
in 1968. 
18. LONGBOAT PASS, FLA. 
Location. Longboat Pass is located on the west 
coast of Florida about 11 miles northwest of Sarasota 
and 23 miles south of St. Petersburg. Located in 
Manatee County, it is one of several natural inlets 
connecting Sarasota Bay, a tidal estuary, with the 
Gulf of Mexico. (See NOAA Nautical Chart No. 
11425.) 
Existing project. The authorized project provides 
for an entrance channel 12 by 150 feet from the Gulf 
to Longboat Pass Bridge, thence a channel 10 by 100 
feet from Longboat Pass Bridge along a north to northeasterly 
alinement to the Intracoastal Waterway 
and extending along Intracoastal Waterway to Cortez 
Bridge. The mean tidal range is 2.2 feet and the 
maximum tidal range is about 5 feet. Currents are 
predominantly tidal. 
(See Table 9-B for Authorizing Legislation.) 
Local cooperation. Fully complied with. See 1978 
Annual Report for detailed local cooperation requirements. 
Contributed funds for new work were 
$172,324. 
Terminal facilities. From Sarasota north to Tampa 
Bay there are about 28 small craft facilities including 
marinas, boat repair yards, and boat basins 
along the Intracoastal Waterway. Nine of them are 
located within 2 miles of Longboat Pass. Numerous 
private mooring piers and wharves also exist in the 
area. The marina and repair facilities appear adequate 
for the general boating needs of the area. 
Operations and results during fiscal year. Maintenance: 
None. 
Condition at end of fiscal year. Construction of the 
project is complete. 
19. MANATEE HARBOR, FLA. 
Location. The project is located in Manatee County 
on the east side of Tampa Bay 10 miles from The Gulf 
of Mexico. (See NOAA Nautical Chart No. 11414.) 
Existing project. The authorized project provides 
for maintenance of the existing 40-foot deep draft 
navigation channel and turning basis which extends 
from the Tampa Bay Channel to berthing facilities 
at Port Manatee. Also provide initial construction for 
a widener at the northwest end of the Manatee Harbor 
Channel and initial construction to deepen approximately 
6.6 acres adjacent to the southern 
berthing area to provide a larger turning basis. All 
material from the project will be placed on upland 
sites west and northeast of the port slip. 
Estimated cost of new work (Oct. 1987 price levels) 
$9,430,000 Federal and $12,300,000 non-Federal 
($3,170,000 contributed funds and $9,130,000 for 
other costs.) 
Local cooperation. Fully complied with to date. 
Terminal facilities. Existing facilities at Port 
Manatee consist of 675 acres of port operational 
lands; a ship basin 1,500 feet long by 788 feet wide; 
and an approximately 3-mile access channel, with a 
design width of 400 feet, which connects with the 
Federally authorized Tampa Bay Channel. The Manatee 
project was constructed between August 1968 
and February 1970. The required design depth was 
40 feet, and the dredging contractor was allowed a 
9-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
pay overdepth of 2 feet. Port Manatee also operates 
its own terminal railroad, which is licensed under the 
Interstate Commerce Commission, and publishes a 
switching tariff as a Class III railroad. It also maintains 
and operates two switch engines and about 
30,000 feet of track which connect with the Seaboard 
Coastline Railroad. 
Operations and results during fiscal year. None. 
Condition at end of fiscal year. Construction has 
not started. LCA will be negotiated in 3rd Quarter 
FY 1988. Construction scheduled to start early FY 
1989. 
20. MAYAGUEZ HARBOR, P.R. 
Location. The project is on the west cost of Puerto 
Rico, about 110 miles by water from San Juan Harbor. 
(See NOAA Nautical Chart No. 25673.) 
Existing project. The authorized project provides 
for a 30 by 1,000 foot approach channel to the deep 
water terminal, decreasing to a 500 foot width opposite 
westerly end of terminal, thence the same 
width to easterly end of terminal. (See Table 9-B for 
Authorizing Legislation.) 
Local cooperation. Fully complied with to date. 
Trminalfacilities. A modern deep water terminal 
is located in the northeast section of the harbor consisting 
of a bulkhead wharf about 1,270 feet long 
with a storage transit shed 800 by 60 feet immediately 
shoreward. The Puerto Rico Industrial Development 
Company, an agency of the Commonwealth of 
Puerto Rico, owns a bulkhead wharf of about 200 feet 
in line with the existing deep water terminal plant 
located within the industrial harbor area. In addition, 
Bumble Bee Packing Company, Inc., owns and operates 
a dock of about 200 feet for docking tuna fish 
boats. Facilities are considered adequate for existing 
commerce. 
Operations and results during fiscal year. Maintenance: 
None. 
Condition at end of fiscal year. Project was completed 
in 1934. 
21. MELBOURNE HARBOR, FLA. 
Location. The project is on Indian River about midway 
of the State of Florida, 179 miles south of Jacksonville 
Harbor and 171 miles north of Miami 
Harbor. 
Existing project. The authorized project provides 
for a channel 8 x 100 feet from Indian River to a 400- 
x 800-foot turning basin in Crane Creek. Project is 
about 3,150 feet long. Plane of reference is mean low 
water. The harbor is almost non-tidal. 
Terminal facilities. The Municipal Marina on the 
north end of the turning basin has a 350-foot steel 
bulkhead with eleven finger piers about 40 feet long 
each. There are also two privately owned storage and 
repair facilities and several privately owned boathouses 
and docks. The facilities are considered adequate 
for existing commerce. 
Operations and results during fiscal year. Maintenance: 
None. 
Condition at end of fiscal year. The project was 
completed in 1938. As of September 1984 channel 
depths as authorized were available throughout the 
project. 
22. MIAMI HARBOR, FLA. 
Location. Miami is near the northern end of Biscayne 
Bay, about 71 miles south of the entrance to 
Palm Beach Harbor. Miami River has its source in 
the Everglades and flows southeasterly to enter Biscayne 
Bay at Miami. (See NOAA Nautical Chart No. 
11468.) 
Existing project. The authorized project provides 
for a 38 by 500-foot channel from the ocean to the 
outer end of the north jetty, thence 36 by 400 feet 
through the entrance and across Biscayne Bay to and 
including a turning basin at the municipal terminals; 
a 36-foot depth turning basin at Fisher Island; two 
rubblestone jetties at the entrance; a channel 15 by 
200 feet from the mouth of Miami River to the turning 
basin at the municipal terminals; a channel 8 by 
200 feet from the mouth of Miami River to the Intracoastal 
Waterway and thence 100 feet wide to 
Government Cut; a channel 15 deep in Miami River 
varying in width from 250 feet at mouth to 90 feet 
inland; and a channel 12 by 100 feet from Miami to 
a harbor of refuge in Palmer Lake. Plane of reference 
is mean low water, except for 15-foot channel 
in Miami River where depths are based on flood 
conditions. Total length of the project is about 15.3 
miles. 
Mean tidal variation is 2.5 feet at entrance and 2 
feet in the bay. Extreme variation is about 4.5 feet 
at entrance and 3 feet in Biscayne Bay. Strong easterly 
winds raise the water level about 1.5 feet at entrance 
and 1 foot in the bay. Strong westerly winds 
lower water level about 1 foot at entrance and about 
0.5 foot in the bay. (See Table 9-B for Authorizing 
Legislation.) 
Local cooperation. Fully complied with. See 1978 
Annual Report for detailed local cooperation requirements. 
Assurances of local cooperation for the 1968 
modification to the project were accepted December 
18, 1968. 
Terminal facilities. There are 91 commercial 
waterfront facilities serving the port. The General 
Cargo Facilities include 21,373 feet of usable berthing 
space, 13 transit sheds with a total capacity of 
474,300 square feet, and 9 freight stations with a 
9-10

JACKSONVILLE, FLA. DISTRICT 
total storage capacity of 270,400 square feet. Oil Handling 
Facilities consist of 2,714 feet of usable berthing 
space and 36 storage tanks with a total storage 
capacity of 744,475 barrels. Available sharehouse 
storage includes dry storage at 1,450,500 square feet 
and cold storage at 11,204,000 cubic feet. There are 
117.1 acres of open storage at the port. 
Hoisting Facilities located at the port include two 
40-ton cranes and cranes with capacities up to 200 
tons available thru local rental. Twelve waterfront 
repair yards and two offwater yards serve the port. 
Drydock facilities available include 7 marine railways 
and 4 boat lifts with haulout capacities ranging from 
40 to 1,000 tons and lifting capacities ranging from 
70 to 500 tons. Nine tugs, with ratings up to 3,000 
horsepower, and thirteen tank barges, with capacities 
up to 35,000 barrels, are also available. Rail Facilities 
at the port are served by the Seaboard Coast 
Line and the Florida East Coast Railway. 
Facilities are considered adequate for existing 
commerce. (See Port Series #16, Rev. 1982.) 
Operations and results during fiscal year. New 
work: Contract for recreation facilities at Bay Front 
Park underway cost $1,599,131. Engineering and design 
and supervision and administration costs were 
$81,283 and $139,697, respectively. 
Maintenance: Condition and operations studies 
cost $1,356. Engineering and design costs were 
$-260. 
Condition at end of fiscal year. Construction of the 
modification to the project, authorized by River and 
Harbor Act of 1968, is complete. South and north jetties 
are in good condition. 
23. NEW PASS, SARASOTA, FLA. 
Location. Sarasota Bay is a tidal lagoon along the 
west coast of Florida immediately south of Tampa 
Bay. New Pass is a gulf inlet across the bay from 
Sarasota, Fla. (See NOAA Nautical Chart No. 11425.) 
Existing project. The authorized project provides 
for an entrance channel 10 feet deep and 150 feet 
wide in the Golf of Mexico diminishing to 8 by 100 
feet through New Pass and extending across Sarasota 
Bay to the Intracoastal Waterway with side channels 
to, and turning basins at, Payne Terminal and 
city pier. Place of reference is mean low water. Mean 
range of tide is 1.3 feet in Sarasota Bay; mean spring 
range is 1.7 feet. Project is about 4 miles long. (See 
Table 9-B for Authorizing Legislation.) 
Local cooperation. Fully complied with to date. 
Non-Federal contribution for new work amounted to 
$45,811. 
Terminal facilities. Consist of Payne Terminal, a 
slip 200 by 650 feet, and city pier, 400 feet long with 
two finger piers equipped with adequate facilities at 
each location. 
Operations and results during fiscal year. Maintenance: 
None. 
Condition at end of fiscal year. Project was completed 
in 1964. 
24. OKEECHOBEE WATERWAY, FLA. 
Location. The waterway traverses the southern 
part of the Florida peninsula via the Caloosahatchee 
River, Lake Okeechobee, and St. Lucie Canal, connecting 
coastal waterways along the Gulf and 
Atlantic Shores. (See NOAA Nautical Chart No. 
11428.) 
Previous projects. For details, see page 785 of 1949 
Annual Report. 
Existing project. The authorized project provides 
for replacing the old locks on the St. Lucie Canal by 
a single new lock; a channel 10 by 100 feet from Ft. 
Myers for about 5 miles upstream, thence 8 by 80 
to 100 feet to the Intracoastal Waterway, Jacksonville 
to Miami; near Stuart; an 8-foot depth basin at 
Stuart; a side channel at Ft. Myers; operation and 
care of St. Lucie Lock; and maintenance of features 
completed under previous projects as follows: a 12 
by 200-foot channel from the Gulf to Punta Rassa, 
thence 10 by 100 feet to Fort Myers with a 10-foot 
depth basin at Fort Myers; a 6 by 80foot channel 
along the south shore of Lake Okeechobee from 
Clewiston to St. Lucie Canal; a 6 by 60-foot channel 
in Taylor Creek from the town of Okeechobee to the 
Lake; and operation and care of Moore Haven and 
Ortona Locks. 
(See Table 9-B for Authorizing Legislation.) 
For further details see 1962 Annual Report. 
Local cooperation. Fully complied with for completed 
portion of project. Non-Federal contribution 
amounted to $503,700. 
Terminal facilities. There are 3 freight piers, 1 
municipal recreation pier, 4 privately owned piers, 
and a municipal yacht basin on the Caloosahatchee 
River near Fort Myers. The Corps has provided a 
boat basin, launching ramp, and a 120-foot wharf on 
the Caloosahatchee River about one-quarter mile below 
Ortona Lock. There are tie-up dolphins above and 
below all 5 locks. Commercial yacht basins are provided 
on the south side of the Caloosahatchee River 
about halfway between Ortona and Moore Haven 
Locks and about 3 miles east of LaBelle. A commercial/
municipal yacht basin is provided on the north 
side of the St. Lucie Canal at Indiantown. 
There are numerous small wooden-pile landings 
along the Caloosahatchee River on St. Lucie Canal, 
and on the St. Lucie River, including one railroad terminal 
pier, a municipal pier, and a pier for handling 
petroleum products at Stuart. Also, 550 feet of 
wharves have been provided on the west side of Taylor 
Creek immediately landward of Hurricane Gate 
9-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
No. 6 and 150 feet on the east side of the creek. A 
yacht basin has been provided on the west side of the 
creek immediately landward of the hurricane gate. 
The installations of Taylor Creek are privately 
owned, but are open to the public. A breakwater protected 
harbor is available at Pahokee. There is a 
440-foot marginal wharf on the Industrial Canal at 
Clewiston; a 125-foot wharf at LaBelle; a 150foot 
wharf at Belle Glade; a 125-foot wharf at Moore 
Haven; a 50-foot wharf at Alva; and a 30-foot wharf 
on Taylor Creek at the town of Okeechobee. A docking 
facility for loading raw sugar was constructed 
in 1967 on Herbert Hoover Dike near Belle Glade. 
All have highway and/or railway connections. Facilities 
are considered adequate for existing commerce. 
Operations and results during fiscal year. (See Table 
9-F for work accomplished.) 
Condition at end of fiscal year. The project is complete 
except for providing the 8-foot depth basin at 
Stuart, which is inactive. 
Tobtal Federal costs under the existing project 
through September 30, 1987, were $5,178,315 for 
new work, $25,681,184 for maintenance ($67,558 excluded 
which represents services rendered without 
reimbursement), a total of $30,859,499. 
25. OKLAWAHA RIVER, FLA. 
Location. The river has its source in a system of 
large lakes in the central part of the Florida peninsula 
and flows generally northerly, then easterly, 
emptying into St. Johns River 22 miles above Palatka. 
The extreme head of the system is considered to 
be Lake Apopka, 120 miles above the river's mouth. 
Previous projects. For details, see page 613 of 1938 
Annual Report. 
Existing project. The authorized project provides 
for a channel 6 feet deep from the river mouth to 
the head of Silver Springs Run; clearing a channel 
to Lake Griffin; maintaining dikes to obtain a navigable 
depth of about 4 feet to Leesburg and construction 
of a lock and dam at Moss Bluff. The 
project length is about 85.7 miles in the river and 
5.4 miles in Silver Springs Run. 
(See Table 9-B for Authorizing Legislation.) 
Local cooperation. Fully complied with to date. 
Terminal facilities. Several private and public landings 
and boat-launching ramps are located along the 
river. Public recreation-craft basins and boat launching 
ramps are near Silver Springs and State Road 
40 and 316 bridges. There is a municipal wharf on 
Lake Griffin at Leesburg. A dam has created Lake 
Ocklawaha (13,000 acres) with egress to the St. Johns 
River through Buckman Lock. Along the lake are 4 
launching ramps; Payne's Landing, Orange Springs, 
Kenwood Landing, and Rodman Recreation Area. Access 
below the dam is at the Oklawaha Boat launch 
ramp and at State Road 19. Facilities are considered 
adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Channel maintenance costs were $59,042. 
Real estate management costs were $-282. 
Condition at end of fiscal year. The project is complete 
except for providing a 6-foot depth channel 
from the mouth of the river to the head of Silver 
Springs run, which is in an inactive status. The Moss 
Bluff lock and dam structure was replaced under the 
Four River Basins, Fla., flood control project. 
Total Federal costs under the existing project 
through September 30, 1987 have been $311,352 for 
new work and $2,103,312. for maintenance, a total 
of $2,414,664. 
26. PALM BEACH HARBOR, FLA. 
Location. The authorized project is located on the 
east coast of Florida about 71 miles north of the entrance 
to Miami Harbor and about 264 miles 
southeasterly from the entrance to Jacksonville Harbor. 
(See NOAA Nautical Chart No. 11472.) 
Existing project. The authorized project provides 
for an entrance channel 35 by 400 feet merging with 
an inner channel 33 by 300 feet to and including a 
turning basin; tank revetment; and restoring jetties. 
Plane of reference is mean low water. The project 
is about 1.6 miles long. 
Mean range of tide in the ocean at the entrance 
is 2.8 feet and at the turning basin, 2.2 feet. Extreme 
range of tide is about 4.5 feet at the inlet and 3 feet 
at the terminals. Seven-foot tidal ranges have occurred 
during storms. For details, see 1962 Annual 
Report. (See Table 9-B for Authorizing Legislation.) 
Local cooperation. Fully complied with to date. For 
requirements, see 1961 Annual Report. Non-Federal 
contribution for new work was $509,506. 
Terminal facilities. The port has 13 commercial 
waterfront facilities. The General Cargo Facilities include 
5,156 feet of usable berthing space and 6 transit 
sheds with a total of 118,030 square feet storage 
capacity. The Oil Handling Facilities consist of 10 
storage tanks with a total capacity of 2,029,600 barrels. 
Usable berthing space in not available at the Oil 
Handling Facilities. Dry storage is available at 
150,500 square feet, cold storage at 19,200 cubic feet 
and open storage at 27.1 acres. 
Seven cranes with capacities from 15 to 230 tons 
are located at the port. There are no floating cranes, 
repair facilities or drydock facilities located at the 
port. A 100 ton vertical boat lift is located on the Intracoastal 
Waterway south of the port for heavy lifts. 
Two tugs with ratings of 900 and 1000 horsepower 
are available. The Palm Beach Belt Line which connects 
with the Florida East Coast Railway serves the 
port. 
9-12

JACKSONVILLE, FLA. DISTRICT 
Facilities are considered adequate for existing 
commerce. (See Port Series #16, Rev. 1982.) 
Operations and results during fiscal year. New 
work: Engineering and design and supervision and 
administration costs were $6,138 and $1,044, respectively. 
Maintenance: Management of natural resources 
cost $375. Condition and operation studies for the 
project totaled $87,159. Contract for dredging maintenance 
cost $612,762. Real estate management 
costs were $377. Engineering and design and supervision 
and administration costs were $26,262 and 
$58,342, respectively. 
Condition at end of fiscal year. The Project was 
completed in 1967. Jetties and revetment are in need 
of repair. The south jetty was completed in FY 86. 
27. PONCE DE LEON INLET, FLA. 
Location. Ponce de Leon Inlet is on the Atlantic 
coast of Florida about 65 miles south of St. Augustine 
Harbor and 57 miles north of Canaveral Harbor. (See 
NOAA Nautical Chart No. 11485.) 
Existing project. The authorized project provides 
for an entrance channel 15 by 200 feet across the 
ocean bar, thence 12 by 200 feet and 12 by 100 feet 
through the inlet; thence southward in Indian River 
North, 12 by 100 feet, and northward in Halifax 
River, 7 by 100 feet, each leg continuing to the Intracoastal 
Waterway; ocean jetties on the north and 
south of the inlet 4,200 and 2,700 feet long, respectively, 
and a weir in the north jetty with an impoundment 
basin inside the jetty. Plane of reference is 
mean low water. Mean range of tide is 4.1 feet in the 
ocean and 2.3 feet inside the inlet. The project is 
about 5 miles long. 
Local cooperation. Fully complied with to date. 
Non-Federal contribution for new work was 
$2,415,600. 
Terminal facilities. None in the immediate area. 
Operations and results during fiscal year. Maintenance: 
Real estate management costs were $6,357. 
Condition and operation studies cost $24,250. Engineering 
and design costs were $109,699. 
Condition at end of fiscal year. Construction of the 
project is complete. Repair of the north jetty was 
completed in FY 86. 
28. PONCE HARBOR, P. R. 
Location. Ponce Harbor is an open bay about midway 
on the south coast of Puerto Rico. From the 
center of the city of Ponce, the harbor is about 3 
miles south. (See NOAA Nautical Chart No. 25677.) 
Previous project. For details, see page 12 of Annual 
Report for 1975. 
Existing project. The authorized project provides 
for a seawall 362 feet long extending northwesterly 
across the rock reef from near the landward end of 
the municipal pier; dredging an area off the 
municipal pier, 30 feet deep and containing about 18 
acres; a breakwater 2400 feet long extending southwesterly 
from Punta Carenero; a channel 36 feet 
deep by 600 feet wide extending from the Caribbean 
Sea approximately 2.8 miles up to the port, thence 
a channel 400 feet wide by 36 feet deep into the harbor, 
and a 36-foot-deep, irregularly shaped turning 
basin with a diameter of 950 feet. Plane of reference 
is mean low water. Mean tidal range is 0.6 foot, extreme 
varies between about 1 foot below and 2 feet 
above mean low water. Estimated cost of new work 
(Oct. 1987 price levels) is $7,320,000 Federal 
($6,340,000 Corps and $10,000 U.S. Coast Guard) and 
$4,003,000 non-Federal (other costs). (See Table 9-B 
for Authorizing Legislation.) 
Local cooperation. Should provide all lands, easements 
and rights-of-way; provide and maintain at local 
expense depths in berthing areas and local access 
channels; hold United States free from any damages 
resulting from construction and maintenance of the 
project; relocate without cost to the United States 
all cables, sewer mains, water supply, drainage and 
other utility installations as required; provide adequate 
public terminal and transfer facilities open to 
all on equal terms. A letter has been received from 
mayor of Ponce, assuring compliance with local requirements 
and to cost share the project. A 25% contribution 
is required and an additional 10% 
reimbursement over 30 years from locals. 
Terminal facilities. The municipality of Ponce 
owns and operates the only deep-draft terminal facilities 
in Ponce Harbor, which consist of a municipal 
pier 515 feet long and 108 feet wide, and a bulkhead 
wharf 3,811 feet long. Both are equipped for transfer 
and storage of freight. A 40 ton container lift 
shore crane is available for the handling of loaded 
containers. The municipal pier has a steel transit 
shed 386 by 85 feet. The bulkhead wharf has four 
steel transit sheds totaling over 103,000 square feet. 
Three concrete and steel warehouses are available 
providing 800,000 square feet for general storage. 
Open storage areas for structural steel, lumber, and 
other bulk and package commodities are also provided. 
Bulk cement is handled and loaded into cement 
cargo ships by the use of a private pipeline loading 
facility. A tuna fish processing and canning factory 
is located on the premises, with direct access to the 
bulkhead wharf. Existing facilities are open to the 
public. 
Facilities are considered adequate for existing 
commerce. 
Operations and results during fiscal year. New 
Work: Engineering and design and supervision and 
administration costs were $68,581 and $9,279 respectively. 
9-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Maintenance: None. 
Condition at end of fiscal year. Construction of the 
1976 modification of the project has not commenced. 
South and north jetties are in fair condition. 
29. PORT EVERGLADES HARBOR, FLA. 
Location. The harbor is on the east coast of Florida 
about 23 miles north of Miami and about 48 miles 
south of Palm Beach Harbor, Florida. (See NOAA 
Nautical Chart No. 11470.) 
Existing project. The authorized project provides 
for an ocean entrance channel 45 by 500 feet through 
an ocean bar tapering to 42 by 450 feet between rubblestone 
entrance jetties, and continuing at that 
depth to an irregularly flared entrance and turning 
basin of same depth; enlarging Pier 7 channel to 36 
by 400 feet for distance of about 1,600 feet; maintenance 
of the locally dredged channel opposite 
Berth 18 to 36 feet deep over a length of 700 feet 
with varying widths of 200 to 150 feet; construction 
of a south jetty fishing walkway; and, maintenance 
of the jetties. Plane of reference is mean low water. 
The project is about 1.9 miles long. Mean range of 
tide is 2.5 feet at the entrance and 2.3 feet at the 
terminals; extreme range is about 4.5 feet with storm 
tides of about 6.5 feet. 
Estimated cost of new work (Oct. 1980 price levels) 
of the 1974 authorization is $33,800,000 Federal 
(Corps of Engineers) cost and $7,062,000 
non-Federal cost, $160,000 contributed funds and 
$6,902,000 other costs). (See Table 9-B for Authorizing 
Legislation.) 
Local cooperation. Local Cooperation has been fully 
complied with for work completed to date. For 
work under House Document 144/93/1, local interest 
must: provide all lands, easements, and rights-of-way; 
save United States free from damages; accomplish 
utility and other relocations or alterations; provide 
depths in berthing areas and local access channels 
serving the terminals commensurate with depths 
provided in the related project areas; establish regulations 
prohibiting discharge of pollutants into 
waters of the channel by users thereof; prohibit erection 
of any structure within 100 feet of project channel 
as authorized at time of construction; provide and 
maintain public terminal and transfer facilities; contribute 
50 percent of total first costs of recreational 
jetty fishing facility; and operate and maintain jetty 
fishing facility. Assurances of local cooperation for 
the 1974 authorization have been furnished by the 
local sponsor. 
Terminal facilities. There are 22 commercial 
waterfront facilities serving the port. The General 
Cargo Facilities include 13,807 feet of usable berthing 
space, 7 transit sheds with a total capacity of 
393,870 square feet, and 6 container yards with space 
for 3,965 containers. Oil Handling Facilities consist 
of 232 storage tanks with a total storage capacity of 
9,564, 800 barrels. There is no usable berthing space 
located at the Oil Handling Facilities. Dry storage 
is available at 225,000 square feet, cold storage at 
2,098,000 cubic feet and open storage at 100.3 acres. 
Hoisting facilities available from a local firm include 
5 cranes with capacities from 20 to 155 tons. 
No floating cranes or derricks for heavy lifts are 
available at the port. There are 2 marine repair yards. 
Drydock facilities include 2 drydocks with capacities 
of 2,200 and 3,200 tons and a 4,270-ton vertical boat 
lift. Three tugs with ratings up to 4,290 horsepower 
serve the port. The Port Everglades Belt Line connects 
with the Seaboard Coast Line railroad to serve 
the port. 
Facilities are considered adequate for existing 
commerce. (See Port Series #16, Rev. 1982,) 
Operations and results during fiscal year. New 
work: Contract underway for canals and channels 
cost $9,951,304. Engineering and design and supervision 
and administrations costs were $210,649 and 
$-63,326, respectively. 
Maintenance: None. 
Condition at end of fiscal year. Work required to 
complete the project is construction authorized in 
House Document 144/93/1. 
30. REMOVAL OF AQUATIC GROWTH 
FROM NAVIGABLE WATERS IN THE 
STATE OF FLORIDA. 
Location. Water hyacinth, hydrilla and water lettuce 
are found in freshwater streams and lakes in 
various parts of the district. 
Existing project. The authorized project provides 
for destruction or removal of aquatic growth in 
navigable waters of the State so far as they constitute 
an obstruction to navigation and commerce, using 
any mechanical, chemical or other means not 
injurious to cattle, and use of log booms to close 
sloughs and backwaters as an auxiliary means. No 
estimate of the final cost of work has been made. (See 
Table 9-B for Authorizing Legislation.) 
For further details, see 1962 Annual Report. 
Local cooperation. None required. 
Operations and results during fiscal year. Maintenance: 
Operations continued during the year. (See 
Table 9-B for Authorizing Legislation.) (See Table 9-G 
for spraying operations.) 
Condition at end of fiscal year. The project is for 
maintenance of navigable waterways. During the 
year 16,950 acres of floating vegetation (water hyacinths 
and/or water lettuce), 3,142 acres of hydrilla 
and 1,024 acres of minor plants were controlled in 
approximately 2,200 miles of waterways. Hyacinths 
9-14

JACKSONVILLE, FLA. DISTRICT 
in Lake Okeechobee and in St. Johns River 
Watershed are under maintenance control. 
31. ST. AUGUSTINE HARBOR FLA. 
Location. The harbor is on the east coast of Florida, 
about 35 miles south of the entrance to St. Johns 
River and about 180 miles north of Fort Pierce Harbor. 
(See NOAA Nautical Chart No. 11485.) 
Previous project. For details see page 412 of Annual 
Report for 1958. 
Existing project. The authorized project provides 
for a channel 16 feet by 200 feet along the best natural 
alinement as may exist from time to time across 
the new inlet bar, thence 12 feet deep to the Intracoastal 
Waterway; a sandtrap groin on the north 
side of the inlet extending seaward from the shore 
of Vilano Beach, and a sand-tight jetty on the south 
side of the channel extending seaward from the shore 
of Conch Island parallel to and coextensive with the 
groin, future landward extension of the groin and jetty; 
and a channel 10 by 100 feet in San Sebastian 
River from the Intracoastal Waterway to King Street 
Bridge, with a turning basin near the upper end. 
Length of the inlet channel is about 1.5 miles, and 
length of the San Sebastian River channel is about 
2.6 miles. Plane of reference is mean low water. The 
mean tidal range is 4.5 feet in the ocean at St. Augustine 
Inlet and 4.2 feet at the city waterfront. 
Strong northerly winds, mostly in the winter, lower 
the water surface about 1 foot. (See Table 9-B for 
Authorizing Legislation.) 
Local cooperation. Fully complied with to date. 
Non-Federal contribution for new work amounted to 
$137,500. 
Terminal facilities. There are several timber docks 
on the Matanzas waterfront of St. Augustine. In this 
area of the harbor is a concrete dock which serves 
as a municipal yacht pier. It has fuel facilities, 19 slips 
and accommodates boats up to 60 ft. in length. A 
large public boat ramp is also available. The principal 
terminals are the numerous shrimp docks in the San 
Sebastian River which flows southward through the 
city into the Matanzas River south of the bridge; 
these consist of timber wharves, with frame and corrugated 
iron warehouses thereon, and 9 marine railways 
for small boats. There is also a marine supply 
facility and several boat yards. The present terminals 
have highway connections and several of the shrimp 
docks have rail connections. They are considered adequate 
for existing commerce and recreational craft. 
Operations and results during fiscal year. None 
Condition at end of fiscal year. Project is completed 
except for the North Jetty which is in a deferred 
status. The groin is in good condition except for the 
300 feet which has subsided to about elevation 3.0 
feet, mean low water. The jetty is in good condition, 
but is submerged at high tide. Total Federal costs under 
the existing project through September 30, 1987 
were $1,405,131 for new work and $4,714,107 for 
maintenance, a total of $6,119,238. 
32. ST. JOHN'S RIVER, FLA., JACKSONVILLE 
TO LAKE HARNEY 
Location. Rises in marshes of Brevard County, Fla., 
near east coast, and flows northwesterly to Jacksonville, 
thence easterly into the Atlantic Ocean, 122 
miles south of Savannah River. River is about 285 
miles long, of which 161.5 miles are included in project. 
(See NOAA Nautical Chart No. 11492.) 
Previous projects. Adopted by River and Harbor 
Acts of June 14, 1880 and July 5, 1884. For further 
details see Annual Reports for 1915 and 1938. 
Existing project. Channel 13 feet deep and 200 feet 
wide from Florida East Coast Railway bridge at 
Jacksonville to Palatka, thence 12 by 100 feet to Sanford, 
and thence 5 by 100 feet to Lake Harney, with 
side channel to Enterprise and maintenance of two 
jetties. 
Existing project was authorized by River and Harbor 
Acts of March 2, 1945 (H. Doc. 445, 78th Cong., 
2d sess.) and July 24, 1946 (S. Do. 208, 79th Cong., 
2d sess.). For further details see Annual Report for 
1962. 
Terminal facilities. There are 36 piers and wharves 
along project, including municipal piers and wharves 
at Green Cove Springs and Palatka, 12 Navy piers 
at Green Cove Springs, a municipal recreational pier 
at Sanford, and 19 privately owned piers, 5 of which 
have nearby tank storage facilities for petroleum projects. 
Facilities are considered adequate for existing 
commerce. 
Operations and results during fiscal year. None. 
Condition at end of fiscal year. Active portion is 
complete. Condition of project as a whole is adequate 
for present needs of navigation. (For more detailed 
information refer to Annual Report for F.Y. 1963). 
33. ST. LUCIE INLET, FLA. 
Location. The inlet is on the east coast of Florida 
about 19 miles south of the entrance to Fort Pierce 
Harbor, Florida, and 100 miles north of the entrance 
to Miami Harbor, Florida. (See NOAA Nautical 
Chart No. 11472.) 
Previous project. For details see page 764 of Annual 
Report for 1949. 
Existing project. The authorized project provides 
for extending the north jetty about 500 feet and 
modifying existing jetty to provide a sand bypass 
weir section about 500 feet long;, excavation of a sand 
impoundment basin adjacent to the bypass weir in 
the north jetty; construction of a south jetty consisting 
of a rubblemound structure about 2,400 feet 
long with a walkway for recreational fishing;, chan- 
9-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
nel between existing bar cut and the Intracoastal 
Waterway 10 by 500 feet through the bar cut, tapering 
to 150 feet through the inlet, and 100 feet wide 
and 7 feet deep to the Intracoastal Waterway; and 
transfer of 380,000 cubic yards of material to the 
south beach during each two year maintenance period. 
Plane of reference is mean low water. Total 
project length is about 1.9 miles. Mean tidal range 
is 2.6 feet on the ocean side and about 1 foot on the 
land side of the inlet. 
The estimated cost of the 1974 modification (Oct. 
1979 price levels) to the project is $6,290,000 Federal 
cost and $2,525,000 nonFederal cost ($2,260,000 
contributed funds and $265,000 other costs). (See Table 
9-B for Authorizing Legislation.) 
Local cooperation. Local interests must: contribute 
19.9 percent of construction cost allocated to 
navigation in the combined project, 23.2 percent allocated 
to beach erosion, and 50 percent of construction 
cost of jetty fishing walkway; provide 39.8 
percent of the annual maintenance cost allocated to 
navigation and 23.2 percent of the annual costs for 
maintenance dredging allocated to beach erosion control 
for periodic beach nourishment and 100 percent 
of the annual jetty maintenance costs allocated to 
beach erosion control; maintain jetty fishing walkway; 
agree that each five years the amount of local 
cost sharing for maintenance is to be adjusted; provide 
all lands, easements, and rights-of-way; hold 
United States free from damages; provide marina 
with mooring facilities and utilities; provide and 
maintain depths in berthing area and local access and 
feeder channels commensurate with the depths 
provided in the project; accomplish such alterations 
as required in sewer, water supply, drainage, and 
other utility facilities, and take action to place in effect 
statutes and/or regulations which will protect 
the water quality for the authorized uses of the 
project. Assurances of local cooperation for the 1974 
modification were signed by the local sponsor on August 
24, 1978. 
Terminal facilities. A municipal pier provides facilities 
for docking and servicing charter fishing and 
small recreational craft. At Stuart there is a dock for 
handling bulk petroleum products and several marinas 
which provide facilities for mooring, servicing 
and minor repair of small craft. Facilities are considered 
adequate for existing commerce. 
Operations and results during fiscal year. New 
work: Engineering and design and supervision and 
administration costs were $2,898 and $269, respectively. 
Maintenance: Condition and operation studies cost 
$20,527. Engineering and design costs were $73,213. 
Condition at end of fiscal year. Work required to 
complete the project is construction authorized in 
House Document 294/93/1. Total Federal costs under 
existing project through September 30, 1987 
were $10,948,511 for new work (including $3,086,026 
contributed funds) and $4,797,674, for maintenance, 
a total of $15,746,185. 
34. SAN JUAN HARBOR, P. R. 
Location. San Juan Harbor is on the north coast 
of Puerto Rico about 35 miles from the island's east 
end and 1100 miles southeast of Miami, Florida. (See 
NOAA Nautical Chart No. 25670.) 
Previous projects. For details see Annual Reports 
for 1915, 1916, 1938. 
Existing project. Modification of the authorized 
project to provide the deepening of the Bar Channel 
to 48 feet and shifting its alinement 350 feet west; 
deepening Anegado and Army Terminal to 40 feet; 
deepening Graving Dock Channel, the Cruise Ship 
Basin, Puerto Nuevo Channel, and San Antonio 
Channel to 36 feet; and deepening Anchorage Area 
E to 38 feet while reducing its size and constructing 
six mooring dolphins within its limits. A 
1500-foot-long extension to San Antonio Channel 
would be added to the Federal project and Sabana 
approach deepened to 32 feet. 
Local cooperation. Should provide all lands, easements 
and rights-of-way; hold the United States free 
from any damages; provide and maintain depths in 
berthing areas and local access and feeder channels; 
provide alterations as required in sewer water supply, 
and other utility facilities. It is further recommended 
that local interests be reimbursed for work 
performed by them on the project subsequent to project 
authorization. Local interests have complied with 
authorization requirements to date. There was no 
non-Federal contribution required. 
Terminal facilities. There are 28 piers and bulkhead 
wharves in the harbor capable of docking deepdraft 
vessels, which have an aggregate berthing 
length of about 23,700 feet. Eleven piers and bulkhead 
wharves are on the north shore, two piers and 
a three-level ramp facility for roll-on/roll-off operations 
at Front Graving nel, Dock turning basin and chan- nine at the eastern side and three at the western 
side of the Army Terminal basin and channel, and 
three on the south shore of San Antonio Channel. 
One pier and bulkhead wharf are privately owned, 
seven are U.S. Government property, and 24 owned 
by the Commonwealth of Puerto Rico. Twenty piers 
and wharves are equipped with mechanical crane 
transfer facilities. Five wharves are equipped with 
a special crane for the handling of loaded containers. 
Twenty-four are open to general public. Pier No. 
6 has been repaired and improved in 1985. 
There is an aggregate length of about 1,339 feet 
of berthing space at Catano Point used principally 
by small vessels within the 18foot draft range. This 
space is also open to the public. In addition, there 
9-16

JACKSONVILLE, FLA. DISTRICT 
are 10 piers and bulkhead wharves with approximately 
6,910 feet of berthing space owned and 
operated by different agencies of the Federal Government. 
This space is not open to the public. 
Facilities are considered adequate for existing 
commerce. 
Operations and results during fiscal year. Maintenance: 
Condition and operation studies cost $1,052. 
Contract dredging cost $-13,699. 
Condition at end of fiscal year. Remaining work 
to complete project is modification authorized in 
1976. 
Total Federal costs under the existing project 
through September 30, 1987 were $13,027,284 for 
new work and $14,256,601 for maintenance, a total 
of $27,283,885 regular funds. In addition, $747,684 
was expended for new work and $44,730 for maintenance 
from public works funds and $100,000 for 
new work from contributed funds. Existing project 
includes the entrance channel and turning basin to 
Army Terminal which cost $1,543,712; this expenditure 
was made from military appropriations and 
is not included in above costs. 
35. TAMPA HARBOR, FLA. 
Location. Tampa Harbor is in a large natural indentation 
of the Gulf of Mexico about midway of the 
west coast of Florida. The entrance is about 220 miles 
north of Key West and about 330 miles southeast of 
Pensacola. (See NOAA Nautical Chart Nos. 11413 
and 11414.) 
Previous projects. For details see page 665 of 1938 
Annual Report. 
Existing project. The authorized project provides 
for a channel from the Gulf of Mexico to Port Sutton 
and Tampa; 46 by 700 feet from the Gulf of Mexico 
to Mullet Key; 44 by 600 feet in Mullet Key Cut 
Channel; 44 by 500 feet in Tampa Bay from Mullet 
Key Cut to Hillsborough Bay and Port Tampa Channels; 
44 by 500 feet in Hillsborough Bay from junction 
with Tampa Bay and Port Tampa Channels to 
the junction with Port Sutton entrance channel, 
thence 42 by 400 feet to the junction with Seddon 
and Garrison Channels; 44 by 400 feet in Port Sutton 
entrance channel; 42 by 400 feet in Sparkman 
Channel; 40 by 300 feet in Ybor Channel; 42 by 400 
feet in Port Tampa Channel; 44 by 400-500 feet in 
East Bay entrance channel; 44 by 300 feet in East 
Bay approach channel; 30 by 300 feet in Seddon and 
Garrison Channels; 30 by 200 feet in Alfia River; 9 
by 100 feet in Hillsborough River to a point 2,000 
feet above Columbus River bridge; a breakwater; turning 
basins at Port Sutton, Ybor Channel, Port Tampa, 
East Bay, mouth of Hillsborough River, and in 
Alafia River; and maintenance of a channel 12 by 200 
feet in Hillsborough River, 44 by 200 feet in Port Sutton 
terminal channel, and 34 x 300 in East Bay Channel. 
(The 46-foot and 44-foot depth portions of the 
project include a 5-foot underkeel clearance. Special 
studies on the project concluded that a 4-foot underkeel 
is sufficient. Therefore, a 1-foot overdepth has 
been placed in an inactive status, resulting in active 
project depths of 45 and 43 feet, respectively.) Plane 
of reference is mean low water. The project is about 
67 miles long, including 10 miles in Hillsborough 
River and 3.6 miles in Alafia River. 
Mean range of tide is 1.3 feet at the lower end of 
the bay, 1.6 feet at Port Tampa, and 1.8 feet at Tampa. 
Extreme range is about 3.8 feet at the lower end 
of the bay and 4.8 feet at Tampa. Strong southwesterly 
winds raise the water level about 1.5 feet. Strong 
northerly winds, which usually occur in the winter, 
lower the water level about 2 feet. Estimated cost 
of new work (Oct. 1987 price levels) of the 1970 
modification to the project is $211,141,000 Federal 
($208,856,000 Corps and $2,285,000 U.S. Coast 
Guard) cost and $18,361,000 non-Federal cost 
($13,829,000 contributed funds and $4,532,000 other 
costs). (See Table 9-B for Authorizing Legislation.) 
For further details, see 1962 Annual Report. 
Local cooperation. Local cooperation has been fully 
complied with for work completed to date. See 1978 
Annual Report for requirements for work authorized 
by the River and Harbor Act of 1970, HD 
401/91/2 and HD 150/91/1. Assurances of local 
cooperation for the 1970 authorization were approved 
by the Secretary of the Army on January 10, 
1973. The LCA for branch channels was signed 20 
June 1986. An amendment to the LCA reflecting 
cost sharing requirements of WRDA of 1986 for section 
6 was signed 31 Aug. 1987. 
Terminal facilities. There are 102 commercial 
waterfront facilities serving Tampa Harbor. The 
General Cargo Facilities consist of 7,226 feet of usable 
berthing space and 15 transit sheds with a total 
of 585,200 square feet of shed storage space. The Oil 
Handling Facilities include 16,440 feet of usable 
berthing space and 316 storage tanks for a total capacity 
of 11,610,350 barrels. Dry storage is available 
at 1,904,750 square feet, cold storage at 
14,309,000 cubic feet, and open storage at 59.4 acres. 
There are 2 wharves available for coal storage at 
750,000 tons total storage and grain elevators with 
a 3,400,000 bushel total capacity. One elevator on 
Ybor Channel is a 1,000,000 bushel capacity. 
Hoisting Facilities include 13 cranes, fixed and mobile, 
with capacities from 45 to 150 tons and other 
crawler and mobile cranes available locally. Marine 
repair yards include 9 waterfront repair facilities and 
numerous other offwater companies engaged in various 
phases or marine repair. There are 4 floating 
and 4 graving docks available at the port with capacities 
ranging from 548 to 5,400 long tons. Floating 
equipment includes 24 tugs with up to 3,350 horsepower 
and 4 companies with tank barges of capaci- 
9-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
ties up to 14,000 barrels. The Seaboard System Railroad 
serves the port. 
Facilities are considered adequate for existing 
commerce. (See Port Series #17 revised 1979.) 
Operations and results during fiscal year. New 
work: Engineering and design and supervision and 
administration costs were $42,340 and $-15,067, 
respectively. 
Maintenance: District Radio Communication Network 
cost was $25,000. Condition and operation 
studies was $161,087. Real estate management cost 
was $3,690. Engineering and design and supervision 
and administrative costs were $241,352 and $577 
respectively. 
Condition at end of fiscal year. Work authorized 
by the River and Harbor Act of 1970 (HD 401/91/2 
is 65 percent complete.) 
'Ibtal Federal costs under the existing project 
through September 30, 1987 were: Main project: 
$194,961,296 for new work and $19,632,731 for maintenance, 
a total of $214,594,027 regular funds. In addition, 
$853,050 was expended for new work from 
public works funds, $1,463,000 from emergency relief 
funds, and $1,029,180 from contributed funds. On 
Hillsborough River $270,466 was expended for new 
work. 
36. NAVIGATION PROJECTS ON WHICH 
RECONNAISSANCE AND CONDITION 
SURVEYS ONLY WERE CONDUCTED 
DURING PERIOD. 
(See Table 9-H.) 
37. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
(See Table 9-I.) 
38. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION 
Navigation Activities Pursuant to Section 107, 
Public Law 86-645 (Preauthorization) 
Fiscal year costs for Aguadilla Harbor, PR, 
$13,741; Benner Bay -Mangrove Lagoon, V.I., $2,105; 
Blount Island, Florida, $46; Cedar Island-Keaton 
Beach Channel, Florida, $41,961; Dunedin Pass, 
Florida, $82; North Lake Channel, Hollywood, Florida, 
$1,468; Pasco County, Small Boat Channel, Florida, 
$6,023; Rockhous Creek, Florida, $20,033; and 
Willoughby Creek, Florida, $319. 
Snagging and clearing for navigation (Sec. 3 of 
1945 River and Harbor Act, Public Law 14, 79th 
Congress.) 
No costs incurred. 
Beach Erosion Control 
39. BREVARD COUNTY, FLA. 
Location. The project is on the east coast of Florida 
at approximately the midpoint of the peninsula. 
(See NOAA Nautical Chart Nos. 11484 and 11476.) 
Existing project. The authorization provides for a 
protective and recreational beach with a berm 50 feet 
wide at elevation 10 feet above mean low water and 
a natural seaward slope as would be shaped by wave 
action, along 14,600 feet of beach at the city of Cape 
Canaveral and 10,600 feet of beach at Indialantic and 
Melbourne beach, and for periodic nourishment of 
the restored beach at Indialantic and Melbourne 
Beach limited initially to a period of 10 years. 
Nourishment of the restored beach at the city of 
Cape Canaveral would be provided by the authorized 
sand-transfer plant for construction at Canaveral 
Harbor. The project also provides for improvement 
of the Federally owned shores for beach erosion control 
or hurricane protection to be accomplished by 
the Federal agencies involved, subject to their own 
determination of economic justification. The areas 
involved include 4.9 miles of shore at Kennedy Space 
Center, 4.0 miles at Cape Kennedy Air Force Station, 
and 2.3 miles at Patrick Air Force Base. 
Mean tidal range in the area is 3.5 feet. Estimated 
cost of the project (Oct. 1987 price levels) is 
$8,650,000 Federal costs and $8,753,000 non-Federal 
cost ($8,650,000 cash contribution and $103,000 for 
lands). (See Table 9-B for Authorizing Legislation.) 
Local cooperation. Local interests must contribute 
50 percent of all first costs of the work and 50 percent 
of the nourishment cost at Indialantic and Melbourne 
Beach for the first 10 years of the project life; 
provide lands and rights-of-way; provide, after the 
first 10 years of project life, periodic nourishment of 
the restored beach at Indialantic and Melbourne 
Beach during project life; maintain continued public 
ownership of the shore upon which the amount of 
Federal participation is based; control water pollution; 
and hold the United States free from damages. 
Assurances of local cooperation were approved by the 
Secretary of the Army on July 9, 1973. 
Operations and results during fiscal year. New 
work: Engineering and design cost $13,667. 
Condition at end of fiscal year. Initial beach fill has 
been provided at Indialantic and Melbourne beaches. 
40. BROWARD COUNTY, FLA. BEACH 
EROSION CONTROL AND HILLSBORO 
INLET, FLA., NAVIGATION PROJECT 
Location. Broward County is on lower east coast 
of Florida, 300 miles south of Jacksonville and about 
30 miles north of Miami. Hillsboro Inlet is in northern 
part of Broward County. (See NOAA Nautical 
Chart No. 11466.) 
9-18

JACKSONVILLE, FLA. DISTRICT 
Existing project. The authorization provides for 
Federal participation toward cost of a shore restoration 
and protection project and a project to provide 
and maintain a channel adequate for small craft navigation. 
Plan provides for restoration of a protective 
and recreational beach at four locations generally 100 
feet wide with berm elevation of 10 feet above mean 
low water, a navigation channel 8 by 100 feet from 
the Intracoastal Waterway to a point 1,500 feet 
oceanward in Hillsboro Inlet, thence 10 by 150 feet 
in the ocean; jetties on north and south sides of ocean 
entrance; a permanently based floating dredge; and 
on a deferred basis, a trestle-mounted sandtransfer 
plant, if needed. Navigation portion of the project 
is in an inactive status. Mean range of tide in areas 
is 2.5 feet. Plane of reference is mean low water. Cost 
estimate for new work (Oct. 1987 price levels) is 
$25,700,000 Federal and $21,900,000 non-Federal 
contribution. (See Table 9-B for Authorizing Legislation.) 
Local cooperation. Local interests must contribute 
90.5 percent of the first cost of beach restoration in 
the reach between north county line and Hillsboro 
Inlet, 90 percent of first cost allocated to beach restoration, 
and 50 percent of first cost allocated to navigation 
for reach between Hillsboro Inlet and Port 
Everglades and 72.4 percent of beach restoration in 
reach between Port Everglades and south county 
line; provide all lands and rights-of-way; obtain approval 
of Chief of Engineers of plans and specifications 
if local interests construct beach erosion 
features; and furnish assurances that they will hold 
the United States free from damages, provide and 
maintain adequate public landing or wharf at Hillsboro 
Inlet, establish a public body to cooperate financially 
and to provide and operate local facilities for 
navigation, control water pollution, maintain ownership 
of publicly owned shores, and maintain all 
project works except the jetties (maintenance of the 
channel to revert to the United States if sand- transfer 
plant is constructed). Assurances of local cooperation 
were accepted November 22, 1968. 
Operations and results during fiscal year. New 
work: Engineering and design and supervision and 
administration costs were $12,687 and $2,084, 
respectively. 
Condition at end of fiscal year. Project was constructed 
by local interests and is complete. 
41. DADE COUNTY, FLA. 
Location. Dade County is on the southeast coast 
of Florida. Project area consists of that part of the 
Atlantic shoreline of the county from Government 
Cut north to Bakers Haulover Inlet and at Haulover 
Beach Park. (See NOAA Nautical Chart No. 11466.) 
Existing project. Project provides for a protective 
and recreational beach having a dune at elevation 
11.5 feet and a level berm 50 feet wide at elevation 
9 feet, mean low water, for beach erosion control and 
hurricane protection between Government Cut and 
Bakers Haulover Inlet; a protective and recreational 
beach with a berm elevation of 9 feet for beach 
erosion control at Haulover Beach Park; and Federal 
participation in the initial construction and in periodic 
nourishment of both the above reaches for the 
first 10 years of project life. Plane of reference is 
mean low water. Mean range of tide in the area is 
2.5 feet. 
Estimated cost of the project (Oct. 1987 price levels) 
is $48,800,000 Federal cost and $41,339,000 non- 
Federal cost ($39,500,000 cash contribution and 
$1,839,000 other costs). 
Project was authorized by Flood Control Act of 
1968 (HD 335/90/2). 
Local cooperation. Local interests must (a) contribute 
for the first cost of the work: between Government 
Cut and Bakers Haulover Inlet amounts 
ranging from 60.2 percent of the cost of the fill within 
the project limit with existing shorefront ownership, 
and 100 percent of the cost of fill required 
landward of the project limit; and for the work at 
Haulover Beach Park, contribute 21.3 percent of the 
entire first cost excluding costs for lands, easements, 
rights-of-way, relocations, and preproject work, but 
including credit for preproject work; (b) contribute 
in cost for the first 10 years of project life, amounts 
ranging from 88.9 percent of the nourishment cost 
for the beach, with existing ownership, to 60.7 percent 
with public ownership, and the entire maintenance 
cost for the dune, all between Government 
Cut and Bakers Haulover Inlet; (c) provide all lands 
and rights-of-way; (d) hold United States free from 
damages; (e) assure continued public ownership and 
use of the shore upon which the amount of Federal 
participation is based; (f) assure maintenance of the 
groin, and after the first 10 years of project life, periodic 
nourishment of the protective beach and maintenance 
of the dune during the economic life of the 
project; (g) assure that water pollution will not be 
permitted; (h) prevent removal or relocation by man 
of fill from the beach berm and dune; (i) prevent the 
erection of barriers to the littoral movement of 
material that would interfere with the nourishment 
of the beach; (j) maintain at the parks qualifying for 
70 percent Federal participation a zone that excludes 
permanent human habitation; (k) at least annually 
inform interests affected that the project will not 
provide complete protection from a hurricane tide 
level equal to or higher in elevation than that of the 
hurricane of September 1926; and (1)e stablish in public 
ownership for public use the beaches within 
project limits as a requirement for Federal participation 
in the allocated beach erosion control costs of 
improvement of shores presently in private ownership. 
Assurances of local cooperation were accepted 
9-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
January 16, 1973. A supplemental agreement for Bal 
Harbour portion was approved 30 June 1976. 
Operations and results during fiscal year. New 
work: A contract for Jetty Rehabilitation and Extension 
continued at a cost of $2,410,000. Engineering 
and design and supervision and administration costs 
were $97,320 and $50,916, respectively. 
42. DADE COUNTY, NORTH OF 
HAULOVER BEACH, FLA. 
Location. On the southeast coast of Florida. Project 
area consists of that part of the Atlantic shoreline 
extending 2.5 miles north of Haulover Beach Park. 
(See NOAA Nautical Chart No. 11466.) 
Existing project. The existing shore protection project 
for Dade County provides for Federal participation 
in the cost of construction of a beach fill for the 
purpose of erosion control and hurricane protection 
along 9.3 miles of shore between Government Cut 
and Bakers Haulover Inlet and for the construction 
of a beach fill for the purpose of erosion control along 
the 1.2 miles of shore fronting Haulover Beach Park 
and provides for protection and nourishment of 2.5 
miles of beach shore north of Haulover Beach Park 
and for extension of the period of Federal participation 
in the nourishment of the existing project from 
10 years to the life of the project. Cost estimate for 
new work (Oct. 1987 price levels) was $13,500,000 
Federal and $12,200,000 non-Federal cash contribution. 
(See Table 9-B for Authorizing Legislation.) 
Local cooperation. Consistant with the costsharing 
and financing concepts agreed to by the administration 
and the Senate Majority Leadership, local 
interests will be required to provide lands, 
easements and rights-of-way and relocations, pay 
50% of the separable and joint costs allocated to 
recreation, pay 35% of the cost allocated to storm 
damage prevention, hold the United States free from 
damages, control water pollution and furnish assurances 
that they will maintain continued public ownership 
of the shore upon which the amount of Federal 
participation is based during economic life of project. 
Assurances of local cooperation have been requested 
from local sponsors. 
Operations and results during fiscal year. New 
work: Engineering and design and supervision and 
administration costs were $37,591 and $7,718, 
respectively. 
Condition at end of fiscal year. Continuation of 
planning and engineering. 
43. DUVAL COUNTY, FLA. 
Location. On upper east coast of Florida, within 
20 miles of Florida-Georgia line. Ocean shoreline is 
about 16 miles long. (See NOAA Nautical Chart No. 
11488.) 
Existing project. Provides for Federal participation 
toward cost of constructing with artificial fill, a beach 
60 feet wide at elevation 11 feet above mean low 
water with a natural slope seaward, and for periodic 
nourishment for 10 years. Federal participation to be 
100 percent of the first cost of construction applicable 
to the Federal shore and 50 percent applicable 
to the other publicly owned shore and 55.5 percent 
of periodic nourishment cost for first 10 years of 
project life. Mean tidal range at south jetty in St. 
Johns River is 4.9 feet. 
Estimated cost of new work (Oct. 1987 price levels) 
$16,400,000 Federal and $13,934,000 non-Federal 
($11,600,000 contributed funds and $2,334,000 for 
other costs). 
Project was authorized by River and Harbor Act 
of 1965 (HD 273/89/1). 
Local cooperation. Local interests must contribute 
50 percent of first cost of constructing non-Federal 
publicly owned shores; contribute 44.5 percent of 
periodic nourishment costs for first 10 years of project 
life; provide all lands, rights-of-way, and relocations; 
hold the United States free from damages; 
control water pollution; and furnish assurances that 
they will maintain continued public ownership of the 
shore upon which the amount of Federal participation 
is based during economic life of project. Assurances 
of local cooperation were accepted on 
November 29, 1973. 
Operations and results during fiscal year. New 
work: A contract for beach nourishment continued 
at a cost of $1,385,023. Engineering and design and 
supervision and administration costs were $59,398 
and $72,820, respectively. 
Condition at end of fiscal year. Initial beach fill and 
four year advance nourishment has been completed. 
44. PALM BEACH COUNTY, FLA., 
Location. Palm Beach County is on east coast of 
Florida about 300 miles south of Jacksonville and 70 
miles north of Miami. Northerly reach of the project 
is separated from the southerly reach by Palm Beach 
Island. Project consists of about 12.2 miles of ocean 
coastline. (See NOAA Nautical Chart No. 11466.) 
Existing project. Provides for Federal participation 
toward the cost of local shore project for restoration 
of beaches to a general width of 100 feet with a berm 
elevation of 10 feet above mean low water, and periodic 
nourishment for 10 years from the year of initial 
nourishment, as follows: 54.4 percent of the cost 
for the Martin County line-Jupiter Inlet segment; 
54.4 percent of cost for Jupiter Inlet-Lake Worth 
Inlet segment; and 54.4 percent for South Lake 
Worth Inlet-Delray Beach segment, 44 percent of 
the cost for Delray Beach; and 52 percent of cost for 
Delray Beach-Boca Raton inlet segment. Mean 
range of tide is 2.8 feet in the Atlantic Ocean at Palm 
9-20

JACKSONVILLE, FLA. DISTRICT 
Beach and 2.3 feet at Boca Raton Inlet. Estimated 
cost (Oct. 1987 price levels) is $24,500,000 Federal 
and $26,900,000 cash contribution. (See Table 9-B for 
Authorizing Legislation.) 
Local cooperation. Local interests must obtain approval 
by Chief of Engineers of plans and specifications 
prior to commencement of work and furnish 
assurances that they will maintain public ownership 
of publicly owned shores, maintain protective measures 
and provide periodic nourishment of protective 
beaches, and control water pollution. 
Operations and results during fiscal year. New 
work: Engineering and design and supervision and 
administration costs were $52,294 and $6,599, 
respectively. 
Condition at end of fiscal year. Local interests provided 
initial beach fill at Delray Beach which was 
completed in August 1973. A periodic nourishment 
contract at Delray Beach was awarded in FY 1978 
by local interests and the contract has been completed. 
45. PINELLAS COUNTY, FLA. 
Location. Pinellas County is on the Gulf coast of 
Florida, about midway of the peninsula. It extends 
northerly about 39 miles from the main entrance to 
Tampa Bay to the vicinity of the mouth of Anclote 
river. (See NOAA Nautical Chart No. 11411.) 
Previous project. For details see page 429 of Annual 
Report for 1965. 
Existing project. The authorized project provides 
for Federal participation in preserving and protecting 
the shores of Pinellas County, Florida, by: restoration 
of 5,000 feet of beach at Clearwater Beach 
Island; restoration of 49,000 feet of beach at Sand 
Key; restoration of 9,200 feet of beach at Treasure 
Island; construction of 600 feet of revetment at Long 
Key; and advance nourishment of Long Key and periodic 
nourishment of each island. Estimated cost (Oct. 
1987 price levels) is $20,000,000 Federal funds and 
$21,762,000 non-Federal funds ($21,700,000 contributed 
funds and $62,000 other costs). (See Table 
9-B for Authorizing Legislation.) 
Local cooperation. Local interests must: (a) contribute 
in cash the required percentages of the first 
costs of work provided by the Corps of Engineers, 
the percentages varying with the type of beach 
ownership; 94.1 to 50 percent of the beach restoration 
at Clearwater Beach; 98.1 to 50 percent of the 
improvement at Sand Key; 94.3 to 50 percent of the 
improvement at Treasure Island; and 50 percent of 
the first cost of the revetment at Long Key; (b) contribute 
in cash an amount computed in accordance 
with the cost sharing provision contained in P.L. 826, 
84th Congress as amended by P.L. 87-874, for beach 
nourishment cost for the first 10 years of the project 
life; (c) provide lands, easements, and rights-ofway; 
(d) assure maintenance and repair of the stone 
revetment of Long Key; (e) assure periodic nourishment 
of the restored beaches; (f) assure public ownership 
of beaches; (g) assure against water pollution; 
(h) hold the United States free from damages; and 
(i) provide beach for public use. Assurances of local 
cooperation were accepted March 22, 1967. 
Operations and results during fiscal year. New 
work: Contract for Redington shore breakwater and 
groin cost $569,069. Contract for Long Key breakwater 
and beach nourishment costs were $801,000. 
Engineering and design and supervision and administration 
costs for the fiscal year were $366,842 
and $89,977, respectively. 
Condition at end of fiscal year. Construction of the 
project commenced in 1969 and is 28 percent completed. 
Total costs under existing project through 
September 30, 1987 were $5,441,215 Federal funds 
and $2,198,056 contributed funds for new work and 
$5,625 for maintenance. 
46. OTHER AUTHORIZED BEACH 
EROSION CONTROL PROJECTS 
(See Table 9-J.) 
47. BEACH EROSION CONTROL 
ACTIVITIES UNDER SPECIAL 
AUTHORIZATION 
Beach erosion control activities pursuant to section 
108, Public Law 87-874 (preauthorization) 
Reports incurring costs during the fiscal year were 
Boca de Congrejos, P.R., $340; Dorado Public Beach, 
P.R., $5,920; Dunedin Shores, Florida, $396; Guanica 
Public Beach, P.R., $3,020; Gulfport, Florida, 
$18,986; Isla de Cabras, P.R., $286; Key Biscayne, 
Fla., $648,324; Playa de Santa Isabel, P.R., $18; and 
Puerto Nuevo Beach, P.R., $617. 
Beach erosion control activities pursuant to section 
III, Public Law 90-483 Mitigation of Shore Damages 
Attributable to Navigation Projects 
No costs were incurred under the above authorization. 
Beach erosion control activities pursuant to Shoreline 
Erosion Control Act of1974, Public Law 93-251. 
No costs were incurred under the above authorization. 
Flood Control 
48. CENTRAL AND SOUTHERN FLORIDA 
Location. The project is located generally within 
the southeastern eighteen counties of Florida covering 
an area of about 15,200 square miles. It is comprised 
of the Upper St. Johns River basin in the 
northeastern section of project, Kissimmee River ba- 
9-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
sin in central section above the Lake Okeechobee- 
Everglades area in the central and southwestern section, 
and the east coast Everglades area in 
southeastern section. 
Previous projects. Completed works for control of 
Lake Okeechobee were included in and constructed 
under the navigation project for Okeechobee Waterway, 
Fla. (formerly Caloosahatchee River and Lake 
Okeechobee drainage area, Fla.) and under provisions 
of River and Harbor Acts of July 3, 1930, and August 
30, 1935. For further information, see Annual 
Reports, 1948 and 1949. 
Existing project. The authorized project is for flood 
relief and water conservation and provides principally 
for: an east coast protective levee extending from 
the Homestead area north to the eastern shore of 
Lake Okeechobee near the St. Lucie Canal; three 
conservation areas for water impoundment in the 
Everglades area west of the east coast protective levee 
with control structures to effect transfer of water 
as necessary; local protective works along the lower 
east coast; encirclement of the Lake Okeechobee 
agricultural area by levees and canals; enlargement 
of portions of Miami, North New River, Hillsboro, 
and West Palm Beach Canals; enlargement of the existing 
Lake Okeechobee levees and construction of 
new levees on the northeast and northwest shore of 
the lake; increased outlet capacity for improved control 
of Lake Okeechobee; floodway channels in the 
Kissimmee River basin, with suitable control structures 
to prevent over-drainage; an interrelated system 
of canals, levees, pumping stations, and 
structures in southwest Dade County to control 
water levels; and facilities for regulating floods in the 
Upper St. Johns River basin; a system of canals and 
control structures for gravity drainage of Martin 
County and distribution of available water supplies 
to portions of Martin and St. Lucie Counties; and 
works to improve the supply, distribution, and conservation 
of water resources in central and southern 
Florida, including the Lake Okeechobee agricultural 
area, Everglades National Park, and other relat- 
. ed areas. The project will provide water control and 
protection from recurrence of the devastating floodwaters 
from the Everglades and local sources, for the 
highly developed urban area along the lower east 
coast of Florida and for the productive agricultural 
areas around Lake Okeechobee (including towns 
around lake), in the Upper St. Johns and Kissimmee 
River basins, and in South Dade County. Project also 
provides for navigation improvements suitable for 
recreational craft, consisting of locks and channel 
dredging in the upper Kissimmee and St. Johns 
basins. 
The project includes a total of 990 miles of levees, 
978 miles of canals, 30 pumping plants, 212 floodway 
control and diversion structures, 56 railroad 
bridge relocations, and 2 highway bridge relocations. 
The project also provides that upon completion, local 
interests assume operation and maintenance of 
all completed works except levees, channels, locks, 
and control works for regulation of Lake Okeechobee 
and the main control structures of conservation 
areas, which will be operated and maintained by the 
United States. 
The principal features of the hurricane gates, constructed 
under previous projects for Okeechobee 
Waterway and maintained under existing project 
since July 1, 1950, are set forth in Table 9-K. See 
also Table 9-L for principal features of locks and 
dams. 
Estimated cost for new work (Oct. 1987 price levels) 
is $840,400,000 Federal funds ($838,000,000 
Corps and $2,400,000 U.S. Coast Guard) and 
$186,712,000 contributed funds, exclusive of river 
and harbor funds expended on previous projects. Local 
interests' costs in reviewing plans and specifications 
are expected to be $654,000. In addition, 
estimated cost to local interests of lands, rights-ofway, 
and relocations is $294,163,000. (See Table 9-B 
for Authorizing Legislation.) 
Local cooperation. (See Table 9-M for local cash 
contribution.) Local interests must also: provide 
lands, rights-of-way, and spoil disposal areas; hold the 
United States free from damages; bear the cost of 
maintenance and operation of all works except those 
having to do with regulation of Lake Okeechobee and 
the main control structures of conservation areas; 
construct and maintain lateral drainage facilities; 
prohibit encroachment on flood-carrying capacity of 
the improved channels; and assume cost of all new 
highway bridges, relocations of existing bridges and 
alterations to utilities incident to construction of the 
project. In addition, for small boat navigation channels, 
local interests must provide, maintain, and operate 
adequate public landings, sanitary and access 
facilities, and establish regulations prohibiting discharge 
of pollutants into the waters of the locks and 
channels by users thereof. 
Assurances of local cooperation have been accepted 
by the District Engineer for all items of work authorized 
to date except those for the Small Boat navigation 
feature added in 1970 under Section 201 of 
the Flood Control Act of 1965. 
Operations and results during fiscal year. (See Table 
9-N for work accomplished.) 
Operations and care. a. Features completed under 
previous navigation project for Okeechobee Waterway 
and being maintained under this project are: a 
levee about 70 miles long following in general the 
south shore of Lake Okeechobee and a north shore 
levee 15.8 miles long; spillways at Ortona and St. Lucie 
locks; 5 hurricane gates; 20 gated drainage culverts 
through the levee; and 16 spillways along St. 
Lucie Canal. 
9-22

JACKSONVILLE, FLA. DISTRICT 
b. Features completed under existing project that 
are to be maintained with operation and maintenance 
funds are: (1) Levees 47, 48, 49 and 50 - total length 
63 miles and enlargement of existing levees L-D1, 
L-D2, L-D3, L-D4, and L-D9, (2) spillway structures 
S-10, S-11, S-12, S-18C, S-77, and S-78 (3) C-43, Sec. 
4 (Caloosahatchee River), and (4) W. P. Franklin Lock 
and Dam. 
In addition to the actual facilities listed above it 
is necessary under operation and maintenance to 
continue meteorological studies, water level records, 
stream gaging stations, etc., for proper regulation 
of the level of Lake Okeechobee and storage of water 
in Conservation Areas 1, 2 and 3. 
Corps of Engineers - The Corps of Engineers operates 
and maintains the major outlets to Lake 
Okeechobee and Water Conservation Area Nos. 1, 
2A and 3A in central and southern Florida. 
South Florida Water Management District - 
SFWMD is responsible for operation and maintenance 
of the remainder of the project facilities, including 
major pumping stations, spillways, locks 
(except on Okeechobee Waterway), levees and 
culverts. 
Condition at end of fiscal year. The scheduled work 
of project is 81 percent complete. Planning for the 
entire project began in November 1948 and has been 
continued. For construction completed prior to Fiscal 
Year 1980 see Annual Reports for 1960-1979. 
Construction completed under existing project during 
the fiscal year is set forth in Table 9-0. All Federally 
maintained features of the project were 
generally in good condition at the end of the fiscal 
year. (For status of work under contract at end of 
fiscal year see Table 9P.) 
Total Federal costs under the existing project 
through September 30, 1987 were $300,617,159 for 
new work, $55,697,504 for maintenance, a total of 
$356,314,663. In addition, $53,412,653 has been expended 
from contributed funds for new work. 
49. FOUR RIVER BASINS, FLA. 
Location. The Four River Basins area covers about 
6,000 square miles within 14 counties in central and 
southwest peninsular Florida. Project includes all or 
part of the four main stream basins-the Hillsborough, 
Oklawaha, Withlacoochee, and Peace 
Rivers-and all of three smaller coastal basins north 
of Tampa, Florida, drained by the Pithlachascotee 
and Anclote Rivers and Lake Tarpon. 
Existing project. The authorized project provided 
for improvements for control of floods and drainage, 
and for water conservation through construction of 
necessary canals, levees, reservoirs, and control 
structures. More specifically, the project provided for: 
Green Swamp Area-a conservation area and three 
storage reservoirs with necessary canals and control 
structures; Hillsborough River-four flood-storage 
reservoirs, with necessary channels, control structures, 
and levees; Oklawaha River-a levee on the 
north shore of Lake Apopka, improvement of part 
of the river channel and a west bank levee below 
Moss Bluff lock and dam, and replacement of the lock 
and dam; Withlacoochee River-one flood-storage 
reservoir with outlet canals and control structures; 
Peace River-Peace Creek canal and control structures 
and improvements to the existing water control 
and drainage features; Gulf Coastal Areas-Lake 
Tarpon: outlet canal and control structure; Anclote 
River: control structure and channel improvement; 
Pithlachascotee River: reservoir with outlet canals 
and control structures. (See Table 9-Q on Moss Bluff 
Lock.) 
Estimated cost for new work (Oct. 1987 price level) 
is $153,000,000 Federal funds and $128,700,000 
non-Federal cost. ($32,000,000 contributed funds; 
$57,500,000 for lands and damages; and $39,200,000 
for relocations.) (See Table 9-B for Authorizing Legislation.) 
Local cooperation. Local interests must furnish all 
lands, and rights-of-way; provide all alterations or 
replacements of public and private utilities, roads, 
bridges (except railroad bridges), etc.; hold the United 
States free from damages; operate and maintain 
all project works after completion; construct and 
maintain such associated works as are necessary to 
realize benefits made available by the project works; 
and contribute in cash 17 percent of the first cost 
of construction and 50 percent of recreation costs. 
Operations and results during fiscal year. New 
work: Contract for Dead River recreation sites was 
completed at a cost of $556,393. Engineering and design 
and supervision and administration costs were 
$174,417 and $133,099, respectively. 
Condition at end of fiscal year. Construction of the 
project commenced April 18, 1966 and the scheduled 
work is 98 percent complete. See Table 9-R for 
construction of major features of the project completed 
to date. 
50. PORTUGUES AND BUCANA RIVERS P.R. 
(This project authorized as Lago de Cerrillos, Lago 
de Portugues, and Channel Improvement at Ponce.) 
Location. Portugues and Bucana Rivers originate 
on the southern slopes of Cordillera Central divide 
of Puerto Rico and flow from this central ridge of 
the island to the Carribean Sea. Their drainage areas 
are 22.6 and 31.4 square miles, respectively. Ponce, 
the second largest city in Puerto Rico, is located in 
the lower coastal area along Portugues River and is 
the only urban community in the two basins. 
Existing project. The authorized project provides 
for two multiple-purpose reservoirs for flood control, 
water supply, general recreation, and fish and wild- 
9-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
life enhancement-one on Portugues River and the 
other on Cerrillos River, a tributary to the Bucana 
River; enlargement of about 5.7 miles of the Bucana 
River, with an additional 0.2-mile tieback levee at the 
upstream terminus of the improvement; enlargement 
of 2.1 miles of the Portugues River, with an additional 
0.5 mile of tieback levee at the upstream terminus 
of the improvement; and a 1.3 mile diversion 
channel connecting Portugues River to lower Bucana 
River. Estimated cost of the project (Oct. 1987 price 
level) is $302,000,000 Federal cost and $99,200,000 
non-Federal cost ($18,000,000 contributed funds; 
$60,757,000 for lands and damages; $11,096,000 for 
relocations; and $9,347,000 for highway bridges and 
approaches). (See Table 9-B for Authorizing Legislation.) 
Local cooperation. Local interests must provide all 
lands, easements and rights-of-way; hold the United 
States free from damages; operate and maintain all 
project works after completion; repay construction 
cost allocated to water supply in accordance with 
Water Supply Act of 1958; pay one-half of the separable 
cost allocated to recreation and fish and wildlife 
enhancement; prohibit discharge of inadequately 
treated sewage and other pollutants into the reservoir; 
and prevent encroachment on downstream channels. 
Assurances of local cooperation have not been 
completed, except for Cerrillos Reservoir which was 
signed March 15, 1982. 
Operations and results during fiscal year. New 
work: Contract for Cerrillos Dam & Spillway continued 
at a cost of $20,352,000 hired labor costs were 
$68,327. Contract for Upper Portugues Channel Sections 
6E and 6F cost $1,692,000. Contract for Section 
7 continued at a cost of $159,000. Contracts for 
Bucana Debris Basin excavation and Portugues Channel 
improvement and debris control basin has respective 
costs of $684,000 and $219,000. Contract for 
Section 6D cost $73,000. Cultural resource investigations 
cost $287,000. Area office equipment cost 
$11,633. Engineering and design and supervision 
and administration costs were $3,375,098 and 
$2,540,943, respectively. 
Condition at end of fiscal year. Construction of the 
project commenced in September 1975 and is 60 percent 
complete. 
51. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Features transferred to the Central and Southern 
Florida Flood Control District and Southwest Florida 
Water Management District were inspected 
quarterly during the fiscal year at a total cost of 
$27,180. 
52. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 9-S.) 
53. FLOOD CONTROL WORK UNDER SPECIAL 
AUTHORIZATION 
Flood control activities pursuant to section 205, 
Public Law 685, 84th Congress, as amended 
(preauthorization). 
(See Table 9-T.) 
Emergency flood control activities-repairf,l ood 
fighting, and rescue work (Public Law 99, 84th Congress 
and antecedent legislation). 
Federal costs for the fiscal year were $115,950 for 
the Disaster Preparedness Program, and $137,311 
for national emergency and mobilization readiness 
plans. 
Emergency streambank and shoreline protection 
activities pursuant to Section 14, Public Law 526, 
79th Congress as amended (preauthorization.) 
Federal costs for the fiscal year were $142,172 for 
Barrio Barrero, Rincon, Puerto Rico; and $206,652 
for Highway 187, El Thrraplan, Puerto Rico. 
General Investigations 
54. SURVEYS 
Hired labor costs during the fiscal year (all Federal 
funds) were: navigation studies, $291,622, flood 
damage prevention studies $927,009, shoreline protection 
studies, $114,353 and special studies $0 for 
a total of $1,332,984. 
55. COLLECTION AND STUDY OF BASIC 
DATA 
The requirement for preparation of regular flood 
plain information studies has been rescinded. FPI 
studies that deal with land use changes will continue 
to be prepared. FPMS Unit Jacksonville, Fla., 
$60,026. Gold coast hurricane evacuation study, $0; 
and Technical services, $80,983. 
9-24

JACKSONVILLE, FLA. DISTRICT 
TABLE 9-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
1. 
2. 
Aquatic Plant 
Control (R&H 
Act of 1965) 
(Federal Funds) 
Arecibo Harbor, 
P.R. 
(Federal Funds) 
Atlantic 
Intracoastal 
Waterway 
between 
Norfolk, Va. and 
St. John's River, 
Fla. 
(Federal Funds) 
Bakers Haulover 
Inlet, Fla. 
(Federal Funds) 
Canaveral 
Harbor, Fla. 
(Federal Funds) 
(Contrib. Funds) 
Channel from 
Naples to Big 
Marco Pass, Fla. 
(Federal Funds) 
(Contrib. Funds) 
Charlotte 
Harbor, Fla. 
(Federal Funds) 
Cross-Florida 
Barge Canal 
(Federal Funds) 
Eau Gallie 
Harbor, Fla. 
(Federal Funds) 
2,106,000 2,626,000 2,300,000 2,516,000 24,310,670 
2,134,771 2,622,586 2,190,290 2,666,855 24,281,004 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
972,087 
1,048,073 
858 
1,531,000 
1,949,141 
76,370 
73,073 
1,564,000 
1,960,302 
-70,000 
458,802 
149,329 
122,033 
500,000 
246,727 
1,120,000 
1,114,598 
200,253 
190,474 
6,656 
-8,290 
16,241 
3,300,000 
241,023 
5,790,500 
5,628,309 
103,000 
83,296 
62,526 
2,024,000 
2,005,725 
310,000 
242,145 
1,593,000 
1,578,798 
375,000 
345,057 
1,128,0751 
1,128,0751 
0 4,286,699 
467 4,286,699 
361,2252 
361,2252 
5,300,742 
5,300,742 
243,2358 
243,2358 
185,688 
185,688 
341,000 
365,282 
8,429 
8,630 
7,525 
10,290 
148,000 
2,886,993 
3,853,000 
4,014,577 
33,523 
623,853 
642,523 
-116,918 
-99,761 
25,000 
82,642 
1,563,000 
1,603,791 
172,000 
202,624 
14,548,9104 
13,823,2844 
37,675,821 
37,638,665 
1,106,000 
1,079,623 
305,290 
305,290 
1,606,530 
1,606,531 
159,975 
159,975 
533,1696 
533,1696 
11,539,133 
11,530,739 
63,347,473 
63,197,386 
21,164,9636 
21,127,8206 
9,627 
9,627 
710,900 
705,668 
9-25 
2,979,000 
2,894,020 
1,034,500 
1,032,134 
43,100 
-22,317 
-20,216 
50,000 
42,756 
150,000 
10,931 
1,720,500 
1,745,887 
-2,616 
3. 
5. 
9.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 9-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
10. Fernandina 
Harbor, Fla. 
(Federal Funds) 
(Contrib. Funds) 
11. Fort Myers Beach 
Channel, Fla. 
(Federal Funds) 
12. Fort Pierce 
Harbor, Fla. 
(Federal Funds) 
(Contrib. Funds) 
13. Gulf Intracoastal 
Waterway, 
Caloosahatchee 
River to Anclote 
River, Fla. 
(Federal Funds) 
14. Intracoastal 
Waterway, 
Jacksonville to 
Miami, Fla. 
(Federal Funds) 
(Contrib. Funds) 
15. Jacksonville 
Harbor, Fla. 
(Federal Funds) 
(Contrib. Funds) 
16. Jacksonville 
Harbor (Mill Cove), 
Fla. 
(Federal Funds) 
17. Johns Pass, Fla. 
(Federal Funds) 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
-2,000 
- 116 
3,768,928 
4,368,503 
116 
-35 17,575 
2,261,000 577,562 
2,244,910 594,389 
35 - 
56,464 
46,375 
-134,834 
125,783 
170,300 
810,601 
709 
939,046 
936,138 
5,365,700 
8,048,812 
342 
37,419 
37,419 
77,214 
63,391 
125,000 
139,039 
929,962 
852,580 
7,355,000 
7,362,380
1 
342,839 
341,589 
367,561 
377,389 
136,675 
153,614 
88,200 
98,667 
391,036 
486,735 
61,000 
771,854 
781,020 
25,000 
268,015 
269,265 
9-26 
50,000 
62,193 
150,000 
143,378 
87,500 
81,006 
403,000 
401,755 
106,000 
99,824 
3,095,500 
3,093,169 
61,000 
4,000,300 
3,952,929 
25,000 
961,000 
148,856 
4,197,8167 
4,174,6997 
22,884,019 
22,875,722 
812,000 
811,054 
158,1408 
158,1408 
1,173,946 
1,167,191 
356,056 
356,056 
4,193,035 
4,188,852 
18,574 
18,574 
8,112,5579 
8,112,5579 
5,985,73810 
5,977,38010 
19,251,59811 
19,251,59811 
29,520,96712 
29,500,60812 
61,000 
61,000 
47,596,27813 
47,596,27813 
59,502,58914 
59,453,12714 
102,813 
102,813 
927,65415 
927,65415 
25,000 
25,000 
961,000 
148,856 
82,09816 
82,09816 
1,407,830 
1,407,830

JACKSONVILLE, FLA. DISTRICT 
TABLE 9-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
18. Longboat 
Pass, Fla. 
(Federal Funds) 
(Contrib. Funds) 
19. Manatee 
Harbor, Fla. 
(Federal Funds 
20. Mayaguez 
Harbor, P.R. 
(Federal Funds) 
21. Melbourne 
Harbor, Fla. 
(Federal Funds) 
22. Miami Harbor, 
Fla. 
(Federal Funds) 
J 
(Contrib. Funds) 
23. New Pass 
Sarasota, Fla. 
(Federal Funds) 
24. Okeechobee 
Waterway, Fla. 
(Federal Funds) 
(Contrib. Funds) 
25. Oklawaha 
River, Fla. 
(Federal Funds) 
26. Palm Beach 
Harbor, Fla. 
(Federal Funds) 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
340,000 
327,124 
41,025 
33,523 
76,000 
69,582 
100,000 
93,539 
57,259 
57,259 
2,439 
1,746,300 
1,720,400 
10,000 
18,107 
45,697 
208,803 
-3,984 
3,039 
228,000 
233,567 
1,000,000 
269,054 
116,512 
60,856 
894,000 
892,444 
262 
2,084,000 
2,022,254 
4,062 
7,594 
3,725,000 
3,721,562 
-: 
232,525 
245,401 
11,154 
11,632 
251,338 
252,188 
5,190,000 
3,871,286 
129,211 
183,359 
75,893 
77,449 
1,683,000 
1,779,336 
45,572 
48,143 
685,212 
711,384 
1,020,233 
1,020,233 
1,400,487 
1,400,487 
172,324 
172,324 
168,187 
168,187 
1,032,674 
1,032,674 
17,696 
17,696 
634,864 
634,863 
1,650,000 32,636,06617 
1,820,111 30,739,66717 
- 2,511,825 
1,097 2,511,414 
38,000 2,300,71018 
11,885 2,274,59518 
- 45,81119 
- 45,81119 
- 3,108,304 
- 3,108,304 
5,000 
4,940 
1,735,200 
1,795,491 
55,000 
58,759 
20,000 
7,183 
793,000 
780,280 
21,405,59020 
21,405,53020 
33,280,16621 
33,256,37721 
503,700 
503,700 
315,26422 
315,26422 
2,103,32028 
2,103,31128 
6,924,02124 
6,911,20424 
10,003,11825 
9,987,99425 
9-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 9-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
27. Ponce de Leon 
Inlet, Fla. 
(Federal Funds) 
(Contrib. Funds) 
28. Ponce Harbor, 
P. R. 
(Federal Funds) 
29. Port Everglades 
Harbor, Fla. 
(Federal Funds) 
30. Removal of 
Aquatic Growth 
(Federal Funds) 
31. St. Augustine 
Harbor, Fla. 
(Federal Funds) 
32. St. Johns 
River, Fla. 
Jacksonville 
to Lake Harney 
(Federal Funds) 
33. St. Lucie 
Inlet, Fla. 
(Federal Funds) 
(Contrib. Funds) 
34. San Juan 
Harbor, P. R. 
(Federal Funds) 
35. Tampa Harbor, 
Fla. (Main 
Project) 
(Federal Funds) 
(Contrib. Funds) 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work; 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
2,600,000 
2,742,016 
6,465,846 
6,477,022 
106,192 
108,285 13;2-,500 
140,306 
15,624 
25,025 
32,771 
38,000 
35,020 
1,533,415 
350,000 
304,179 
25,000 
6,187 
131 
2,500 
3,500,000 
4,165,925 
170,889 
216,660 
25,795 
23,506 
24,117 
53,000 
283,422 
36,810 
36,790 
200,000 
77,861 
10,200,00 
10,098,627 
1,953,277 
1,953,277 
15,367,086 
15,357,772 
2,415,600 
2,415,600 
1,379,000 
612,663 
682,90726 
530,55926 
1,327,870 
1,327,870 
54,508,77327 
54,345,58127 
1,598,480 
1,598,410 
2,622,000 2,465,000 2,474,000 2,738,000 30,749,370 
2,803,286 2,450,831 2,477,801 2,744,421 30,721,931 
80,000 
74,285 
33,615 
33,589 
514,688 
286,610 
273,332 
394,043 
176,942 
168,086 
150,725 
9,870,000 
9,352,559 
210,700 
463,233 
60,000 
63,490 
90,000 
74,992 
324,991 
320,979 
585 
2,075,000 
2,079,004 
233,983 
382,492 
170,229 
150,401 
17,015,000 
18,838,450 
170,000 
165,443 
100,000 
111,481 
367,049 
387,772 
16,039 
20,077 
30,986 
60,091 
57,293 
74,172 
2,339,241 
2,376,226 
1,354,000 
1,669,404 
255,000 
262,361 
11,543 
3,167 
92,000 
93,740 
-15,050 
-14,847 
200,000 
158,499 
430,000 
431,706 
44,450 
1,476,43428 
1,476,43428 
4,714,107 
4,714,107 
1,171,24329 
1,171,24329 
1,300,299so 
1,300,2993s0 
7,863,60231 
7,862,48531 
4,808,006 
4,797,674 
3,086,026 
3,086,026 
13,774,96882 
13,774,96832 
14,326,13133 
14,326,13138 
196,058,64334 
195,945,57234 
19,652,522>6 
19,649,83886 
1,074,412 
1,029,180 
9-28

JACKSONVILLE, FLA. DISTRICT 
TABLE 9-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
39. Brevard County, 
Fla. 
(Federal Funds) 
(Contrib. Funds) 
40. Broward County. 
Fla. Beach Erosion 
Control and Hillsboro 
Inlet, Fla., 
Navigation Project 
Federal Funds) 
(Contrib. Funds) 
41. Dade County, 
Fla. 
Federal Funds) 
Contrib. Funds) 
42. Dade County, 
N. of Haulover 
Beach, Fla. 
Federal Funds) 
Contrib. Funds) 
43. Duval County. 
Fla. 
Federal Funds) 
Contrib. Funds) 
44. Palm Beach 
County, Fla. from 
Martin County line 
to Lake Worth 
Inlet to Broward 
County line 
(Federal Funds) 
45. Pinellas County, 
Fla. 
(Federal Funds) 
(Contrib. Funds) 
48. Central and 
Southern Florida 
(Federal Funds) 
(Contrib. Funds) 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
-3,315 
3,637 
4,730,000 
4,773,650 
246,200 
50,000 
59,751 
17,945 
-1,797 
50,000 
-300,000 
279,393 
360,000 
33,204 
15,000 
3,598 
17,615 
940,000 
1,759,116 
741,000 
683,129 
135,000 
12,939 
13,667 
2,346,492 
2,288,416 
29,001 
29,001 
2,262,000 
2,257,081 
244,000 11,277,100 
14,771 11,015,254 
- 26,884 
- 26,884 
- 1,758,84136 
- 1,758,84136 
3,359,000 
3,191,419 
1.985,000 
1,601,237 
100,000 
45,309 
- 1,500,000 
1,000,000 
258,970 
200,000 
23,089 
2,350,000 
1,096,216 
2,370,000 
926,428 
300,000 2,050,000 
48,942 1,884,034 
700,000 
290,475 
-140,706 
217,566 
8,600,000 
11,422,711 
4,292,000 
4,550,595 
2,179,837 
1,652,885 
-130,000 
316,002 
368,342 
50,710 
8,400,000 
7,439,279 
4,073,000 
4,254,980 
1,770,263 
1,030,971 
-506,000 
1,221,457 
272,094 
-300,000 
35,599 
3,544,000 
2,881,443 
3,955,250 
1,862,188 
234,000 
58,893 
803,000 885,000 
943,102 746,218 
549,250 
439,840 
6,065,000 
7,814,088 
4,733,500 
4,916,056 
1,322,261 
813,118 
1,435,000 
407,100 
9,814,000 
9,487,398 
4,507,200 
4,517,244 
179,183 
1,025,861 
36,642,95685 
36,267,41287 
25,560,08538 
24,787,37038 
250,000 
58,248 
1,500,000 
12,456,900 
11,263,102 
10,667,650 
7,198,229 
4,154,834 
3,898,302 
13,621 
13,621 
4,797,693 
4,360,545 
5,625 
5,625 
4,537,641 
3,044,996 
301,935,39740 
300,617,15840 
55,741,661 
55,697,505 
55,552,819 
53,587,652 
9-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 9-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Thxt Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
49. Four River New Work: 
Basins, Fla. Approp. -1,600,000 1,050,000 903,000 566,000 72,946,09541 
(Federal Funds) Cost 764,489 564,734 1,714,126 581,791 72,822,98741 
(Contrib. Funds) New Work: 
Approp. 335,412 647,000 360,000 - 12,746,860 
Cost 335,379 359,508 347,003 259,425 12,629,902 
50. Portugues and New Work: 
Bucana Rivers, Approp. 18,700,000 22,600,000 20,949,000 39,697,000 181,071,568 
P. R. Cost 16,702,794 24,210,107 21,238,471 27,285,097 166,987,149 
(Federal Funds) 
9-30

JACKSONVILLE, FLA. DISTRICT 
1. Excludes $288,000 contributed funds for new work. 
2. Includes $97,566 for previous project. 
3. Excludes $243,235 contributed funds for new work. 
4. Excludes $700,000 contributed by NASA in connection with 
construction of lock. 
5. Includes $113,000 for new work on previous project; excludes 
$15,563 expended for new work on existing project from 
contributed funds. 
6. Excludes $113,744 for maintenance and operation of dams. 
7. Includes $174,880 expended for recreation facilities. 
8. Includes $10,128 cost for reconnaissance and detailed 
project report prepared under Sec 107 modification to the project. 
Excludes $1,095 contributed funds for new work. 
9. Includes $515,479 for new work for previous projects: 
$8,472 for new work on Sunshine Skyway Channel; and $9,707 
for new work for Cats Point Channel. Excludes $14,473 contributed 
funds for new work. 
10. Includes $450,749 for maintenance for previous project. 
11. Includes $94,776 for work for previous projects. Excludes 
$2,199,842 expended from public works funds for new work. 
12. Includes $213,222 for maintenance on previous projects and 
$3,179 operating and care under provisions of permanent indefinite 
appropriation. 
13. Includes $3,520,137 new work on previous project and 
$290,013 for new work expended from public works funds. 
14. Includes $543,399 maintenance on previous projects. 
15. Includes unused contributed funds of $64,136 returned to 
local interests. 
16. Project authorized December 2, 1964, by Chief of Engineers 
under Section 107 of 1960 R&H Act and by Section 110 of the 
1966 R&H Act. Cost of new work excludes $53,732 contributed 
funds. 
17. Includes $5,502,126 expended from public work funds for 
new work. Includes costs of $6,777,906 for recreation facilities. 
18. Includes $381,479 work-in-kind and $172,314 in costs for 
north jetty recreation facility. 
19. Excludes $45,811 contributed funds for new work. 
20. Includes $16,222,275 for new work under previous project, 
$626,925 for recreational facilities (Code 710), and $27,574 for 
reconnaissance and detailed project report prepared under Section 
107 modification to the project. 
21. Includes $7,581,150 for maintenance for previous projects. 
Excludes $1,000 for maintenance from contributed funds on 
previous projects, $67,558 which represents services rendered 
without reimbursement, and $113,744 for maintenance and operations 
of dams. 
22. Includes $3,912 for new work for previous projects. 
23. Includes $11,414 for operating and care under provisions 
for the permanent indefinite appropriation. 
24. Includes $80,000 new work from public works funds. Excludes 
$509,506 contributed funds. 
25. Includes $30,000 for maintenance from public works funds. 
26. Includes $11,588 expended for restudy, but excludes $21,960 
expended for new work from contributed funds. 
27. Excludes $1,033,069 contributed funds. 
28. Includes $71,303 for new work on previous project. Excludes 
$137,500 contributed funds. 
29. Baresford cutoff and completion of cutoffs and easing of 
bends in Putnam Lake and Volusia Counties in inactive status were 
deauthorized by Public Law 93-251 section 12. Includes $29,566 
for new work under previous project. 
30. Includes $25,838 under previous project. 
31. Includes $26,689 for new work under previous project. 
32. Includes $747,684 for new work under previous project. 
Excludes $100,000 expended for new work from contributed funds. 
33. Includes $44,730 in maintenance under previous project. 
34. Includes $853,050 for new work under previous project. 
Excludes $270,466 for new work for Hillsborough River and 
$13,939 for new work from contributed funds. Includes $215,000 
Appropriation and $139,792 cost for new work East Bay Channel. 
35. Includes $17,107 for maintenance under previous project. 
36. Excludes work-in-kind. 
37. Includes $2,294,134 for reimbursement costs to Bal Harbor. 
38. Excludes unused contributed funds of $17,969 returned to 
local interests. 
39. Excludes $300,083 in property for services furnished by 
local interests in lieu of cash contribution. 
40. Excludes $15,543 for property received without reimbursement 
and R&H Funds, expended on previous projects (see 
cost and financial statement for Okeechobee Waterway, Fla., 
project for these costs). Excludes $100,000 advanced by local interests 
toward federal costs. Includes $175,000 appropriation and 
$175,000 cost for new work at C&SF St. Johns Water Mgtm. 
District. 
41. Includes costs of $89,691 for recreation facilities at Moss 
Bluff and $2,638,272 at Lake Tarpon. 
9-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 9-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
October 27, 1965 
August 26, 1937 
March 4, 1913 
June 20, 1939 
July 14, 1960 
March 2, 1945 
October 23, 1962 
Report of the 
Chief of Engineers 
Oct. 1985 
June 20, 1938 
July 14, 1960 
July 25, 1912 
March 3, 1925 
July 3, 1930 
August 26, 1937 
May 17, 1950 
P.L. 675/77 
July 23, 1942 
November 17, 1986 
June 20, 1938 
AQUATIC PLANT CONTROL (See Section 1 of Text) 
Control and progressive eradication of obnoxious aquatic plants, and 
continued research to develop best method of control 
ARECIBO HARBOR, P.R. (See Section 2 of Text) 
Construction of breakwater 1,200 feet long and dredging channel 
25 feet deep and 400 feet wide with flare at entrance and widening 
at inner end to form a maneuvering area. 
ATLANTIC INTRACOASTAL WATERWAY BETWEEN 
NORFOLK, VA. AND THE ST. JOHNS RIVER, FLA. 
(See Section 3 of Text) 
Channel 7 x 100 feet 
Channel 12 feet deep and 90-150 feet wide with cut-offs 
BAKERS HAULOVER (See Section 4 of Text) 
Channel 11 x 200 feet in ocean entrance, thence 8 x 100 feet to 
Intracoastal Waterway; Marina basin 8 x 200 feet; reconstruction of 
jetties and protection of inlet shores. 
CANAVERAL HARBOR, FLA. (See Section 5 of Text) 
Entrance channel jetties, a turning basin enclosed by a dike, and a 
barge canal with a lock 
Maintain improved channel, turning basin, enlarge barge channel and 
lock, relocate dike, provide channel and turning basin west of 
35-foot turning basin, construct and operate sand-transfer plant 
Mitigation of fish and wildlife losses at Port Canaveral West 
Trning Basin Project. 
CHANNEL FROM NAPLES TO BIG MARCO PASS, FLA. 
(See Section 6 of Text) 
Interior channel 6 x 70 feet 
Channel 12 x 150 feet from the Gulf to Gordon Pass, thence 
10 x 100 feet to a point 400 feet south of U.S. Highway 41 Bridge, 
thence 10 x 70 feet to bridge and two turning basins 
CHARLOTTE HARBOR, FLA. (See Section 7 of Text) 
Channel 24 x 300 feet through Gulf through Boca Grande entrance 
Depth of 27 feet at entrance and width of 500 feet at the bend 
Channel 10 x 100 feet to Punta Gorda and a turning basin 
Depth of 30 feet at entrance and width of 700 feet at bend 
Depth of 32 feet in entrance channel 
CROSS-FLORIDA BARGE CANAL (See Section 8 of Text) 
Barge Canal 12 x 150 feet 
Establishment of the Cross Florida National Conservation Area. 
EAU GALLIE HARBOR, FLA. (See Section 9 of Text) 
Channel 8 x 100 feet and a turning basin 
H. Doc. 251, 89th Cong., 
1st sess. 
Rivers & Harbors Committee 
Doc. 43, 75th Cong., 1st sess. 
H.Doc. 898, 62nd Cong., 
2d sess. 
H.Doc. 618, 75th Cong., 
3d sess. 
H.Doc 189, 86th Cong., 
1st sess. 
H.Doc. 367, 77th Cong., 
1st sess. 
S.Doc. 140, 87th Cong., 
2d sess. 
P.L. 99-662, 17 November 1986 
99th Congress 2nd Sess. 
H.Doc. 596, 75th Cong., 
3d sess. 
H.Doc. 183, 86th Cong., 
1st sess. 
H.Doc. 699, 62nd Cong., 
2d sess. 
H.Doc. 113, 66th Cong. 
1st sess. 
Rivers and Harbors Committee 
Doc. 1, 70th Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 95, 74th Cong., 2d sess. 
H.Doc. 186, 81st Cong., 
1st sess. 
H.Doc. 109, 79th Cong., 
1st sess. 
P.L. 99-622 17 November 1986 
99th Congress. 2nd sess. 
H.Doc. 497, 75th Cong., 
3rd sess. 
9-32

TABLE 9-B (Continued) 
JACKSONVILLE, FLA. DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
June 14, 1880 
July 13, 1892 
March 2, 1907 
June 25, 1910 
March 3, 1925 
June 20, 1938 
March 2, 1945 
May 17, 1950 
July 14, 1960 
Auth. by Chief of 
Engineers 
December 6, 1968, 
under Sec. 107 of 
1960 R&H Act. 
Def. Act of 
March 4, 1931 
War Dept. Approp. 
Act, March 4, 1933 
August 30, 1935 
March 2, 1945 
June 30, 1948 
May 17, 1950 
September 3, 1954 
May 10-16, 1957 
Auth. March 1, 1962 
By Senate 
and House 
Public Works 
Committee 
Auth. by Chief of 
Engineers 
March 1, 1963, under 
Sec. 107 of 
1960 R&H Act 
FERNANDINA HARBOR, FLA. (See Section 10 of Text) 
Entrance jetties 
Raising and extending jetties to provide 19-foot depth 
Improvement of inner harbor to obtain 20- to 24-foot depth and 400- to 
600-foot channel width 
Combining improvement of Fernandina Harbor and Cumberland Sound 
under the general heading of Fernandina Harbor 
Provided for a 26-foot channel 
Provided for the 28-foot channel and turning basin 
Provided for reducing the maximum width of turning basin from 
1,000 to 800 feet, for shifting channel line in this vicinity 50 feet 
northwesterly and for including in authorized project small area 
dredged by Rayonier, Inc. 
Provided for 32-foot channel and turning basin 
FORT MYERS BEACH, FLA. (See Section 11 of Text) 
12- x 150 foot channel in San Carlos Bay, thence 11 x 125 feet 
in Matanzas Pass to upper shrimp terminals 
Extension of 11- x 125-foot channel easterly about 2,000 feet to and 
including a turning basin adjacent to natural deep water in 
Matanzas Pass 
FORT PIERCE HARBOR, FLA. (See Section 12 of Text) 
Expenditure of $20,000 for dredging channel, maintenance by 
local interests 
Expenditure of up to $30,000 for dredging channel 
Maintaining channels, jetties, and revetments, and enlarging channels 
and turning basin to existing project dimensions 
INTRACOASTAL WATERWAY, CALOOSAHATCHEE RIVER 
TO ANCLOTE RIVER, FLA. (See Section 13 of Tebxt) 
9- x 100-foot channel; deepening channel at Caseys Pass to 9 feet and 
construction of highway bridge at Venice 
Original route may be modified at no excess cost to U. S. 
Any route in Venice-Lemon Bay area may be used 
Use of alternate Route C-1 in Venice-Lemon Bay area 
Local interests to bear costs of Venice Avenue highway bridge and 
any other necessary crossing over Route C-1i 
Sunshine Skyway Channel to be improved and maintained to 
9 x 100 feet 
Annual Report 1879 
Annual Report 1891 & 1896 
H.Doc. 388, 59th Cong., 
1st sess. 
H.Doc. 227, 68th Cong., 
1st sess. 
H.Doc. 284, 77th Cong., 
1st sess. 
H.Doc. 284, 87th Cong., 
1st sess. 
H.Doc. 662, 80th Cong., 2d sess. 
H.Doc. 183, 86th Cong., 
1st sess. 
Specified in Act 
Specified in Act 
H. Doc. 252, 72nd Cong., 
1st sess. and Rivers and 
Harbors Committee Doc. 21, 
74th Cong., 1st sess. 
H. Doc. 371, 76th Cong., 
1st sess. 
Specified in Act 
Specified in Act 
Specified in Act 
H.Doc. 109, 85th Cong., 
1st sess. 
6- x 80-foot channel in Boca Ciega Bay 
January 21, 1927 
INTRACOASTAL WATERWAY, JACKSONVILLE TO 
MIAMI, FLA. (See Section 14 of lText) 
Channel 8 x 75 feet from Jacksonville to Miami H.Doc. 586, 69th Cong., 
2d sess. 
9-33

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 9-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 3, 1930 
PARA June 26, 1934 
August 26, 1937 
March 2, 1945 
Do. 
Do. 
July 3, 1958 
Chief of Engineers 
Report of July 22, 
1960, Mod. 12-foot 
channel 
March 2, 1907 
Report of the 
Chief of Engineers 
12 Feb 1982 
Auth. by Chief of 
Engineers December 
2, 1964 Under 
Sec. 107 of 1960 
R&H Act and Sec. 
110 of 1966 R&H 
Act. 
Auth. by Chief of 
Engineers 
April 20, 1976 under 
Sec. 107 of 
1900 R&H Act, as 
amended 
Report of the 
Chief of Engineers 
12 May 1980 
August 30, 1935 
August 20, 1937 
July 3, 1930 
Channel width of 100 feet 
Operation and care of Palm Valley Bridge 
Thrning basin at Jacksonville Beach 
Channel 12 x 125 feet 
Side channel and turning basin at Sebastian 
Thrning basin at Vero Beach 
Maintenance of side channel at Daytona Beach 
Channel 10 x 125 feet from Ft. Pierce to Miami 
JACKSONVILLE HARBOR, FLA. (See Section 15 of Text) 
ST. JOHNS RIVER, FLA. OPPOSITE THE CITY OF 
JACKSONVILLE 
The 24-foot area from Hogan Creek to Florida East Coast 
Railroad bridge 
JACKSONVILLE HARBOR (MILL COVE), FLORIDA 
(See Section 16 of Text) 
Enlarge weir structure and west opening controlling flow into 
Mill Cove, to reduce shoaling and improve navigation as well as 
circulation. 
JOHN'S PASS, FLA. (See Section 17 of iText) 
Channel 10 x 150 feet in the gulf, 8 x 100 feet inside pass, 
6 x 100 feet to IWW-2.6 miles long 
LONGBOAT PASS, FLA. (See Section 18 of Text) 
12- x 150-foot entrance channel from Gulf of Mexico to Longboat 
Bridge; 10- x 100-foot channel from Longboat Bridge northeasterly 
to IWW; channel from north channel to Cortez Bridge 
MANATEE HARBOR, FLORIDA (See Section 19 of Text) 
Provide for maintenance of the existing 40-ft. deep draft navigation 
channel and turning basin from Tampa Bay Channel to Port Manatee. 
Initial construction of a widener at Manatee Harbor and deepen 
area adjacent to berthing area. 
MAYAGUEZ HARBOR P.R. (See Section 20 of Telbxt) 
Approach channel 30 feet deep to and along deep water terminal 
MELBOURNE HARBOR, FLA. (See Section 21 of Text) 
Channel 8 x 100 feet and a turning basin 
MIAMI HARBOR, FLA. (See Section 22 of Text) 
MIAMI RIVER 
The 15-foot channel in Miami River, 150 feet wide at the mouth 
S.Doc. 71, 71st Cong., 
2d sess. 
Specified in Act 
H.Doc. 180, 75th Cong., 
1st sess. 
H.Doc. 740, 79th Cong., 
2d sess. 
H.Doc. 336, 76th Cong., 
1st sess. 
H.Doc. 261, 76th Cong., 
1st sess. 
H.Doc. 222, 85th Cong., 
1st sess. 
H.Doc. 663, 59th Cong., 
1st sess. 
P.L. 99-662 17 November 1986 
99th Congress, 2nd sess. 
P.L. 99-662 17 November 1986 
99th Congress, 2nd Sess. 
H.Doc. 215, 72nd Cong. 
1st sess. & River and 
Harbor Committee Doc. 1, 
73rd Cong., 1st sess. 
H.Doc. 390, 74th Cong., 
2nd sess. 
Specified in Act 
9-34

TABLE 9-B (Continued) 
JACKSONVILLE, FLA. DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
PWA Program 
September 6, 1933 
June 13, 1902 
March 2, 1907 
March 4, 1913 
March 3, 1925 
July 3, 1930 
August 30, 1935 
August 26, 1937 
March 2, 1945 
March 2, 1945 
July 14, 1960 
August 13, 1968 
Auth. by Chief of 
Engineers 
April 20, 1964 under 
Sec. 107 of 
1960 R&H Act 
PARA June 26, 1934 
August 26, 1937 
March 2, 1945 
Do. 
March 2, 1945 
Do. 
The channel at the Dinner Key Airport 
An 18-foot channel in a landcut across the peninsula and construction 
of the north jetty 
Construction of the south jetty and increase of channel width 
to 100 feet 
Modification of local cooperation requirements imposed by the Act of 
July 25, 1912 
A channel 25 feet deep with present widths from the ocean to 
Biscayne Bay, thence 200 feet wide across the bay to but not 
including the municipal turning basin, and extension of both jetties 
A channel width of 300 feet across the bay and enlarging the 
municipal turning basin, with expenditures thereon limited to 
$200,000 
A depth of 30 feet from the ocean to and in the turning basin, with 
the existing authorized project widths, including the 300-foot width 
in the channel across the bay 
Extending the turning basin 200 feet to the southward 
The Virginia Key improvement 
For incorporation of the project for Miami River in that for Miami 
Harbor, the widening at the mouth of Miami River to existing project 
widths; the channels from the mouth of Miami River to the turning 
basin and to Government Cut; and the channel from Miami 
River to the harbor of refuge, provided that local interest contribute 
one-third of the cost 
Deletion of Virginia Key development and the Dinner Key approach 
channel, widening the existing ship channel by easing the ocean 
bend and increasing the width of the 300-foot-wide section to 400 
feet, enlarging the existing turning basin 300 feet along both the 
south and northeasterly sides, and dredging a turning basin along 
the north side of Fisher Island about 39 acres in extent and 30 feet 
in depth 
Enlarging existing entrance channel to 38 x 500 feet, deepening 
existing 400-foot-wide channel across Biscayne Bay to 36 feet; 
deepeing existing turning basins at Biscayne Blvd. terminal and 
Fisher Island to 36 feet 
NEW PASS, SARASOTA, FLA. (See Section 23 of IText) 
10- x 150-foot entrance channel; 8- x 100-foot inner channels; and 
8-foot-deep turning basins at Payne Terminal and City Pier 
OKEECHOBEE WATERWAY, FLA. (See Section 24 of Telbxt) 
Operation and care of locks and dams provided for with funds 
from R&H appropriations 
New lock and weir structure in St. Lucie Canal 
Deepening to 8 feet from Ft. Myers to Jacksonville-Miami waterway 
near Stuart via channel across lake from Clewiston 
Channel to yacht basin at Ft. Myers and a basin at Stuart 
Deepening to 8 feet from Ft. Myers to Jacksonville-Miami waterway 
near Stuart via channel across lake from Clewiston 
Channel to yacht basin at Ft. Myers and a basin at Stuart 
S.Doc. 95, 72d Cong., 1st sess. 
and specified in Act 
H.Doc. 622, 56th Cong., 
1st sess. (Annual Report 
1900, p. 1987) 
Specified in Act 
Specified in Act 
H.Doc. 516, 67th Cong., 
4th sess. 
Rivers and Harbors Committee 
Doc. 15, 71st Cong., 2d sess. 
Sen. Comm. Print. 
73d Cong., 2d sess. 
Rivers and Harbors Committee 
Doc. 86, 74th Cong., 2d sess. 
S.Doc. 251, 79th Cong., 2d sess. 
H.Doc. 91, 79th Cong., 
1st sess. 
S.Doc. 71, 85th Cong., 
2d sess. 
S.Doc. 93, 90th Cong., 
2d sess. 
Specified in Act 
Rivers and Harbors Committee 
Doc. 28, 75th Cong., 1st sess. 
H.Doc. 696, 76th Cong., 
3d sess. 
H.Doc. 736, 79th Cong., 
2d sess. 
H.Doc. 696, 76th Cong., 
3d sess. 
H.Doc. 736, 79th Cong., 
2d sess. 
9-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 9-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Auth. by Chief of 
Engineers November 
5, 1968, under 
Sec. 107 of 1960 
R&H Act 
September 19, 1890 
March 2, 1907 
June 25, 1910 
July 25, 1912 
July 27, 1916 
PARA June 26, 1934 
March 13, 1934 
December 10, 1934 
August 30, 1935 
March 2, 1945 
May 17, 1950 
July 14, 1960 
Report of the 
Chief of Engineers, 
10 December 1985 
October 27, 1965 
March 3, 1925 
August 30, 1935 
March 2, 1945 
H.R. September 
23, 1976 
S.R. October 1, 
1976 
Enlarge existing 8- x 90-foot section of Okeechobee Waterway for 
about 5 miles upstream from Ft. Myers to 10 x 100 feet 
OKLAWAHA RIVER, FLA. (See Section 25 of Text) 
Clearing obstructions for channel 4 feet deep from mouth to Leesburg 
Channel 6 feet deep from mouth to head of Silver Springs Run 
Maintenance of levels in the lakes at head of river 
Acceptance of certain artificial waterways in lieu of portions 
of natural river bed 
Operation and care of lock and dam provided for with funds from 
appropriations for rivers and harbors 
PALM BEACH HARBOR, FLA. (See Section 26 of Text) 
Maintenance of improvement previously constructed by local interests 
Deepening the channels and turning basin, as constructed by local 
interests, to 20 feet 
Authorized the work previously approved by Public Works 
Administration and widening the channels to existing project 
dimensions enlarging the 700-foot-square turning basin eastward 
removing the obstructive point on south side of the inlet, revetting 
the banks of the inlet, and restoring existing jetties 
Deepening the channels and turning basin to 25 feet 
Extending the turning basin 550 feet southward over a 900-foot width, 
with a flare to the east; provided that local interests may be reimbursed 
not to exceed $305,000 for work done by them on this 
modification subsequent to July 1, 1949 
An entrance channel 35 feet deep, 400 feet wide, and 0.8 mile long, 
merging with an inner channel 33 feet deep, 300 feet wide and 0.3 
mile long, thence flaring into a turning basin, 1,400 feet north-south 
by a minimum of 1,200 feet east-west 
Assume maintenance 
PONCE DE LEON INLET, FLA. (See Section 27 of Text) 
Widening and deepening channels; jetties on north and south side 
of inlet; a weir in the north jetty and an impoundment basin inside 
the weir 
PONCE HARBOR, P.R. (See Section 28 of Text) 
Dredging 3 continuous areas, aggregating 153 acres, to depths of 30, 
18, and 9 feet, and construction of a seawall, costs to be shared by 
U.S. and local interests 
Modified conditions of local cooperation to provide that U.S. undertake 
all dredging at Federal expense and return local funds previously 
contributed for dredging, all other portions of the improvement 
hereafter to be at the expense of local interests 
Eliminate previously authorized 9-foot dredging area, and provided for 
dredging 30-foot-depth area and 18 acres off the municipal pier and 
for construction of the breakwater off Punta Carenero 
Eliminate previously authorized 18-foot and a portion of the 30-foot 
project outside the proposed 36-foot and a portion of the adjacent 
to the municipal bulkhead. Channel 36 x 600 feet from Caribbean 
Sea to harbor; channel 36 x 400 feet into harbor; and a 36-foot 
turning basin. 
Annual Report 1889, p. 1360 
H.Doc 782, 59th Cong., 
1st sess. 
Specified in Acts 
Specified in Act 
Specified in Act 
H.Doc. 185, 73d Cong., 
2d sess. 
Recommended by Chief of 
Engineers to Public 
Works Administration 
October 17, 1934 
H.Doc. 185. 73d Cong., 
2d sess. and Rivers and 
Harbors Committee Doc. 42, 
74th Cong., 1st sess. 
H.Doc. 530, 78th Cong., 
2d sess. 
H.Doc. 704, 80th Cong., 
2d sess. 
H.Doc. 283, 86th Cong., 
1st sess. (contains latest 
published map) 
P.L. 99-662 17 Nov 1986 
99th Cong. 2nd sess. 
H.Doc. 74, 89th Cong., 
1st sess. 
H.Doc. 532, 67th Cong., 
4th sess. 
Rivers and Harbors Committee 
Doc. 18, 72d Cong., 1st sess. 
H.Doc. 745, 79th Cong., 
2d sess. 
H.Doc. 532, 94th Cong., 
2d sess. 
9-36

TABLE 9-B (Continued) 
JACKSONVILLE, FLA. DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 3, 1930 
August 30, 1935 
June 20, 1938 
July 24, 1946 
July 3, 1958 
H.R. May 9, 1974 
S.R. May 31, 1974 
March 3, 1899 
June 13, 1902 
March 3, 1905 
June 20, 1938 
May 17, 1950 
March 3, 1899 
March 2, 1919 
June 14, 1880 
June 25, 1910 
July 3, 1930 
March 2, 1945 
March 2, 1945 
July 24, 1946 
March 2, 1945 
November 7, 1966 
PORT EVERGLADES HARBOR, FLA. (See Section 29 of Text) 
Maintenance of harbor constructed by local interests 
Enlarge entrance channel and complete turning basin to 
1,200 feet square 
Widen turning basin 350 feet on north side 
Widen turning basin 200 feet on north side, 500 feet on south side and 
enlarge flare at entrance channel 
Deepen and widen entrance channel on a new alinement and increase 
turning basin in size and depth 
Deepen and widen entrance channel, enlarge turning basin, widen 
Pier 7 channel, maintenance of Berth 18 channel, and planning for 
a south jetty fishing walkway with construction contingent upon 
need as developed by detailed postauthorization studies 
REMOVAL OF AQUATIC GROWTH FROM NAVIGABLE 
WATERS IN THE STATE OF FLORIDA (See Section 30 of Text) 
Construction and operation of a suitable vessel and use of log booms 
for removal of water hyacinths in the navigable waters of the State 
Extermination and removal of water hyacinths by any mechanical, 
chemical, or other means 
Prohibits use of any chemical process injurious to cattle 
ST. AUGUSTINE HARBOR, FLA. (See Section 31 of Text) 
Channel 27 x 200 feet protected by a groin 
Channel 16 x 200 feet across bar, and thence 12 feet deep to 
Intracoastal Waterway; jetty on south side of inlet; future landward 
extension of groin and jetty; and channel 10 x 100 feet in San Sebastian 
River 
ST. JOHNS RIVER, FLA., JACKSONVILLE TO 
LAKE HARNEY (See Section 32 of Text) 
A channel 13 feet deep and 200 feet wide from Jacksonville 
to Palatka 
The improvement of Deep Creek 
Two jetties at Volusia Bar (Maintenance only; new work completed 
under previous project.) 
A channel 100 feet wide, 8 feet deep from Palatka to Sanford with a 
side channel to Enterprise, and thence 5 feet deep to Lake Harney 
Cutoffs at Butcher Bend, Shake Creek, and Starks Landing, and 
easing bends at other points 
A channel 10 feet deep and 100 feet wide from Palatka to Sanford, 
with a side channel to Enterprise and with cutoffs and easing of 
bends 
Combining the two projects above into a single project for St. Johns 
River, Fla., Jacksonville to Lake Harney, and for a cutoff 5 feet 
deep and 75 feet wide between Lake Monroe and the vicinity of Osteen 
Bridge (Woodruff Creek Cutoff) 
A channel 12 feet deep and 100 feet wide from Palatka to Sanford, 
and in the branch to Enterprise 
ST. LUCIE INLET, FLA. (See Section 33 of Text) 
Channel 10 x 200 feet 
Modification to maintain existing channel 6 x 100 feet 
H.Doc. 357, 71st Cong., 
2d sess. 
Rivers and Harbors Committee 
Doc. 25, 74th Cong., 1st sess. 
H.Doc. 545, 75th Cong., 
3d sess. 
H.Doc. 768, 78th Cong., 
2d sess. 
H.Doc. 346, 85th Cong., 
2d sess. 
H.Doc. 144, 93d. Cong., 
1st sess. 
Annual Report 1899 
Specified in Act 
Specified in Act 
H.Doc. 555, 75th Cong., 
3d sess. 
H.Doc. 133, 81st Cong., 
1st sess. 
H.Doc. 523, 55th Cong., 2d sess. 
and Annual Report for 
1989, p. 1343 
H.Doc. 699, 63rd Cong., 2d sess. 
Annual Report for 1879, 
pp. 795-798 
H.Doc. 1111, 60th Cong., 
2d sess. 
H.Doc. 691, 69th Cong., 
2d sess. 
H.Doc. 603, 76th Cong., 
3d sess. 
H.Doc. 445, 78th Cong., 
2d sess. 
S.Doc. 208, 79th Cong., 
2d sess. 
H.Doc 391, 77th Cong., 
1st sess. 
H.Doc. 508, 89th Cong., 
2d sess. 
9-37

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 9-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
H.R. May 9, 1974 
S.R. May 31, 1974 
August 8, 1917 
September 22, 1922 
July 3, 1930 
August 30, 1935 
August 26, 1937 
October 17, 1940 
March 2, 1945 
July 3, 1958 
August 4, 1976 
Report of the 
Chief of Engineers 
23 Dec. 1982 
March 3, 1899 
March 3, 1905 
June 25, 1910 
Extending north jetty and modifying existing jetty to provide a sand 
bypass weir section; excavation of sand impoundment basin; 
construction of south jetty with walkway for recreational fishing; 
channel 10 x 500 feet thru bar cut, tapering to 150 feet thru the inlet, 
and 100 feet and 7 feet deep to the Intracoastal Waterway; and 
transfer of 380,000 cubic yards of material to the south beach during 
each two-year maintenance period 
SAN JUAN HARBOR, P.R. (See Section 34 of Text) 
Anchorage (inner harbor) area of 206 acres and San Antonio Channel 
to 30-foot depth 
Substitution of a 68-acre area 30 feet deep along southeasterly side of 
anchorage area, for one 25 acres in extent and of same depth extending 
easterly from eastern end of the San Antonio project channel 
Modified condition of local cooperation 
Entrance channel across outer bar 38 feet deep and 800 feet wide, and 
thence across bay to anchorage area (Anegado Reach Channel) 30 
feet deep and 700 feet wide and increasing anchorage area to 239 
acres to 30-foot depth 
Widening Anegado Reach Channel and increasing anchorage area to 
329 acres 
Removal to 8-foot depth of Anegado, Largo, and Capitanejo Shoals, 
and dredging to 30-foot depth the entrance channel and turning basin 
to the Graving Dock 
Maintenance of the 30-foot depth entrance channel and turning basin 
to the Army Terminal 
Deepening portions of entrance and approach channels and basins to 
Army Terminal and San Antonio Pier areas to 35-45 feet; new 
32-foot depth Puerto Nuevo Channel; new 36-foot depth anchorage 
A bar channel 48 by 800 feet, shifting the centerline 350 feet west; 
deepening Anegado Channel in steps from 46 to 40 feet while 
reducing width to 800 feet; deepening Army Terminal Channel and 
turning basin to 40 feet while widening the channel to 450 feet; 
deepening Puerto Nuevo Channel to 40 feet and widening it to 400 
feet; deepening Graving Dock Channel to 40 feet at existing 
400-foot width; deepenig San Antonio Channel to 38 feet at varying 
widths, minimum of 500 feet; deepening cruise ship basin to 36 
feet at an irregular width; maintaining Sabana Approach Channel at 
30 by 250 feet; provide a 38-foot depth in Anchorage Area "E" with 
irregular width; six mooring dolphins for vessels using the area. 
Modification of the authorized project to provide the deepening of the 
Bar Channel to 48 feet and shifting its alinement 350 feet to the 
west; deepening Anegado, and Army Terminal to 40 feet; deepening 
Graving Dock Channel, and Cruise Ship Basin, Puerto Nuevo Channel, 
and San Antonio Channel to 36 feet; and deepening Anchorage 
Area E to 38 feet while reducing its size and constructing six mooring 
dolphins within its limits. A 1500-foot-long extension to San Antonio 
Channel would be added to the Federal project and Sabana 
approach deepened to 32 feet. 
TAMPA HARBOR, FLA. (See Section 35 of Text) 
TAMPA BAY 
For a channel 27 feet deep from the Gulf of Mexico to Port Tampa, 500 
feet wide across the bar and 300 feet wide in the bay 
For a channel depth of 26 feet with sufficient width from the Gulf of 
Mexico to Port Tampa 
TAMPA AND HILLSBOROUGH BAYS 
For a depth of 24 feet in Hillsborough Bay 
H.Doc. 294, 93rd Cong., 
1st sess. 
H.Doc. 865, 63d Cong., 
2d sess. 
Specified in Act 
H.Doc. 45, 71st Cong., 
2d sess. 
R&H Comm. Doc. 38, 
74th Cong., 1st sess. 
R&H Comm. Doc. 42, 
75th Cong., 1st sess. 
H.Doc. 364, 76th Cong., 
1st sess. 
Specified in Act 
H.Doc. 38, 85th Cong., 
1st sess. 
H.Doc. 574, 94th Cong., 
2d sess. 
P.L. 99-662 17 Nov. 1986 
99th Cong. 2nd Sess. 
H.Doc. 52, 55th Cong., 
3d sess. (Also printed in 
Annual Report 1899, p. 1640) 
Channel dimensions specified 
in Act 
Specified in Act 
H.Doc. 634, 61st Cong., 
2d sess. 
9-38

TABLE 9-B (Continued) 
JACKSONVILLE, FLA. DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
August 8, 1917 
March 3, 1899 
September 22, 1922 
July 3, 1930 
August 30, 1935 
June 20, 1938 
Do. 
March 2, 1945 
Do. 
Do. 
May 17, 1950 
September 3, 1954 
October 23, 1962 
December 31, 1970 
Do. 
Do. 
Do. 
For a 27-foot depth from Gulf of Mexico up to and in the several 
channels of Hillsborough Bay, the widths to be 500 feet on the bar, 
300 feet in Tam a Ba Ybor, and Garrison Channels, and 200 feet 
in Hillsborough Bay, Sparkman, and Seddon Channels, with turning 
basins at the mouth of Hillsborough and at Ybor Estuary 
HILLSBOROUGH RIVER 
For a 12-foot channel to within 100 feet of the Lafayette St. highway 
bridge (maintenance only; new work completed under a previous 
project under the title Improving Hillsborough Bay, Fla.) 
TAMPA HARBOR 
Consolidation of the above projects to form a single project for 
Tampa Harbor 
Increasing the depth of Egmont Channel to 29 feet and the width of 
Sparkman Channel to 300 feet 
For a depth of 32 feet and a width of 600 feet on Egmont Bar, a depth 
of 30 feet and a width of 400 feet in Mullet Key Cut, and a depth of 
30 feet and a width of 300 feet in all other project channels in Tampa 
Harbor (except in Hillsborough River and in the channel leading 
to Alafia River); and for a turning basin 2,000 feet long and 500 
feet in maximum width at the entrance to the Port Tampa terminals 
For widening the bend between Sparkman Channel and Cut D of 
Hillsborough Bay Channel by 250 feet; widening Ybor Channel to 
400 feet and extending the turning basin at the west end of Garrison 
Channel (mouth of Hillsborough River) easterly for 300 feet 
For construction of a breakwater at Peter O. Knight Field, Davis 
Islands, its maintenance to be assumed by local interest 
For widening Sparkman Channel to 400 feet and Ybor Channel to 
500 feet; widening the bend between Sparkman and Garrison Channels 
an additional 250 feet to extend the turning basin westerly; 
and widening the bend between Seddon and Garrison Channels by 
150 feet (in lieu of 300 feet previously authorized) to extend the turning 
basin easterly 
For a channel 9 feet deep and 100 feet wide in the Hillsborough River 
for about 2.4 miles above the upper end of the existing 12-foot 
channel, and for the removal of obstructions thence to the Florida 
Avenue Bridge 
For a channel 25 feet deep and 150 feet wide from the Hillsborough 
Bay channel to and including a turning basin in the Alafia River 
(Revoked by Act of May 17, 1950) 
For deepening Egmont Channel to 36 feet; enlarging Mullet Key Cut, 
Tampa Bay Channel, Hillsborough Bay Channel, Port Tampa Channel 
and Port Tampa turning basin to present project dimensions; 
deepening Sparkman Channel and Ybor turning basin to 34 feet; a 
channel 30 feet deep and 200 feet wide from Hillsborough Bay 
Channel to and including a turning basin in Alafia River, 700 feet 
wide and 1,200 feet long (in lieu of the improvement previously 
authorized); and substantial widening at entrance, bends, and turns 
Extended removal of obstructions in Hillsborough River to City Water 
Works Dam. Maintenance of cleared channel to be assumed by local 
interests 
Channel and turning basin at Port Sutton 30 feet deep, Ybor Channel 
34 x 400 feet 
For federal maintenance of Port Sutton Channel, 280 feet wide and an 
irregularly shaped turning basin both to a depth of 34 feet 
Enlarge entrance channel across Egmont Bar to 46 x 700 feet from 
the Gulf to Mullet Key 
Enlarge Mullet Key Cut Channel to 44 x 600 feet 
Enlarge Tampa Bay Channel to 44 x 500 feet from Mullet Key Cut 
through Tampa Bay to the junction of Hillsborough Bay and Port 
Tampa Channels 
H.Doc. 634, 61st Cong., 
1st sess. 
H.Doc. 545, 55th Cong., 
2d sess. and Annual Report 
1898, pp. 1357-1360 
Specified in Act 
H.Doc. 100, 70th Cong., 
1st sess. 
S.Doc. 22, 72d Cong., 
1st sess. 
S.Doc. 164, 75th Cong., 
3d sess. 
Sen. Comm. Print. 
76th Cong., 1st sess. 
S.Doc. 183, 78th Cong., 
2d sess. 
H.Doc. 119, 77th Cong., 
1st sess. 
S.Doc. 16, 77th Cong., 
1st sess. 
H.Doc. 258, 81st Cong., 
1st sess. 
H.Doc. 567, 81st Cong., 
2d sess. 
H.Doc. 529, 87th Cong., 
2d sess. 
H.Doc. 150, 91st Cong., 
1st sess. 
H.Doc. 401, 91st Cong., 
2d sess. 
Do. 
Do. 
9-39

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 9-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
August 15, 1985 
Report of the 
Chief of Engineers 
25 Jan. 1979 
W.R.D.A. 
17 November 1986 
BEACH EROSION 
CONTROL PROJECTS 
August 13, 1968 
October 27, 1965 
Port of the 
Chief of Engineers 
2 April 1982 
August 13, 1968 
Enlarge Hillsborough Bay Channel to 44 x 500 feet from the junction 
with Tampa Bay and Port Tampa Channels to the junction with Port 
Sutton entrance channel, and thence deepening to a depth of 42 
feet at the existing width of 400 feet to the junction with Seddon 
and Sparkman Channels 
Enlarge Port Sutton entrance channel to 44 x 400 feet 
Enlarge Port Sutton turning basin to a depth of 44 feet and a turning 
diameter of 1,200 feet 
Deepening Sparkman Channel to 42 x 400 feet 
Deepening Ybor Channel to 40 x 300 feet 
Enlarge turning basin at the entrance to Ybor Channel to a depth of 
42 feet and an additional width of 200 feet on the southwest edge 
of the present basin 
Deepening Port Tampa Channel to 42 feet at its existing width from 
the junction with Hillsborough and Tampa Bay Channels to the 
turning basin 
Deepening the Port Tampa turning basin to 42 feet over its existing 
length of 2,000 feet and width of 900 feet 
An entrance channel in East Bay 44 x 400 feet and 500 feet north 
from the Port Sutton turning basin for a distance of about 2,000 
feet 
A turning basin in East Bay at a depth of 44 feet and with a turning 
diameter of 1,200 feet 
An approach channel in East Bay 44 x 300 feet north from the East 
Bay turning basin for a distance of about 2,500 feet 
Maintenance of Port Sutton Terminal channel to 44 x 200 feet for a 
distance of 4,000 feet 
Maintenance of East Bay channel to 34 x 300 feet for a 
distance of 5,500 feet 
TAMPA HARBOR BRANCH CHANNELS 
Enlarging Hillsborough Bay Cut D, Sparkman Channel, Port Tampa 
Channel and existing turning basins at the entrance to Ybor Channel 
and at Port Tampa, all to a depth of 41 ft. with varying lengths 
and widths and deepening Ybor Channel to a depth of 39 feet. This 
work will be associated with the Main Channel deepening. 
TAMPA HARBOR EAST BAY CHANNEL 
Maintenance dredging 
BREVARD COUNTY, FLA. (See Section 39 of Txt) 
Federal participation in cost of shore protection project 
BROWARD COUNTY, FLA., BEACH EROSION CONTROL AND 
HILLSBORO INLET, FLA., NAVIGATION PROJECT (See Section 
40 of Text) 
Improvement for beach erosion control in Broward County, Fla. and a 
combined beach erosion and navigation improvement to Hillsborough 
Inlet and the shore south thereof to Port Everglades 
CHARLOTTE COUNTY, FLORIDA 
Shoreline Protection 
DADE COUNTY, FLA. (See Section 41 of 'Tbxt) 
Federal participation in cost of shore protection and hurricane-flood 
control project 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
H.Doc. 236, 99th Cong., 
1st. sess. 
P.L. 99-662 17 November 1986 
99th Congress, 2nd Sess. 
P.L. 99-662 17 November 1986 
99th Congress, 2nd Sess. 
H.Doc. 352, 90th Cong., 
2d sess. 
H.Doc. 91, 89th Cong., 
1st sess. 
P.L. 99-662 17 November 1986 
99th Congress, 2nd Sess. 
H.Doc. 335, 90th Cong., 
2d sess. 
9-40

TABLE 9-B (Continued) 
JACKSONVILLE, FLA. DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
August 15, 1985 
Report of the 
Chief of Engineers 
27 Dec 1983 
October 27, 1965 
Report of the 
Chief of Engineers 
21 Dec 1981 
Report of the 
Chief of Engineers 
22 April 1984 
October 23, 1962 
November 7, 1966 
Report of the Board 
of Engineers for 
Rivers and Harbors 
23 April 1985 
Report of the 
Chief of Engineers 
28 Feb. 1986 
Report of the 
Chief of Engineers 
26 Feb. 1980 
FLOOD CONTROL 
PROJECTS 
June 30, 1948 
September 3, 1954 
July 14, 1960 
October 23, 1962 
Do. 
Do. 
Do. 
DADE COUNTY-NORTH OF HAULOVER BEACH, FLA. 
(See Section 42 of Text) 
Federal participation in cost of shore protection and hurricaneflood 
control project. 
Extending of existing shore protection project for Dade County to 
provide for protective beach fill and subsequent nourishment along 
2.5 miles of shore north of Haulover Beach Park. 
DUVAL COUNTY, FLA. (See Section 43 of Text) 
Federal participation in cost of shore protection project 
INDIAN RIVER COUNTY, FLORIDA 
Shoreline protection along 1.7 miles of Vero Beach, a 1.7 miles 
beach fill along Sebastian Inlet State Park and periodic nourishment 
of the new beaches. 
MONROE COUNTY, FLORIDA 
Modification of existing project from 6200-ft. long to 8770-ft. long 
beach fill stabilized with two groins and periodic nourishment. 
PALM BEACH COUNTY, FLA., FROM MARTIN COUNTY LINE 
TO LAKE WORTH INLET AND FROM SOUTH LAKE WORTH 
INLET TO BROWARD COUNTY LINE (See Section 44 of Text) 
Federal participation in cost of local shore protection project and 
sand-transfer plant 
PINELLAS COUNTY, FLA. (See Section 45 of Text) 
Federal participation in cost of shore protection project 
Restoration of 5,000 ft. of beach at Clearwater Beach Island, 49,000 ft. 
of beach at Sand Key, 9,200 ft. of beach at Treasure Island, and construction 
of 600 ft. of revetment at Long Key. Also, renourishment 
of each island. 
SARASOTA COUNTY, FLORIDA 
Shoreline protection along 12,600 ft. of shoreline on central Longboat 
and 21,100 ft. on Manasota Key in the vicinity of Venice, Florida 
and periodic nourishment of these areas. 
ST. JOHNS COUNTY, FLORIDA 
Shoreline protectin along 2.5 miles of problem area in the 
St. Augustine Beach and Coquina Gables area and periodic 
nourishment. 
CENTRAL AND SOUTHERN FLORIDA (See Section 48 of Text) 
First phase of comprehensive plan for flood control and other purposes 
Modification and expansion of authorization to include entire 
comprehensive plan of improvement 
Canals, levees, and water-control and drainage structures in the 
Nicodemus Slough area, Glades County 
Flood protection on Boggy Creek, near Orlando 
Flood protection in the Cutler Drain area, near Miami 
Flood control and drainage works for South Dade County 
Project for Shingle Creek between Clear Lake and Lake Tbhopekaliga 
for flood control and major drainage, including development of 
Reedy Creek Swamp 
H.Doc. 236, 99th Cong., 
1st sess. 
P.L. 99-662 17 November 1986 
99th Congess, 2nd sess. 
H.Doc. 273, 89th Cong., 
1st sess. 
P.L. 99-662 17 november 1986 
99 Congress, 2nd sess. 
P.L. 99-662 17 November 1986 
99th Congress, 2nd sess. 
H.Doc. 164, 87th Cong., 
1st sess. 
H.Doc. 519, 89th Cong., 
2d sess. 
P.L. 99-662 17 November 1986 
99th Contress, 2nd sess. 
P.L. 99-662 17 November 1986 
99th Congress, 2nd sess. 
P.L.. 99-662 17 November 1986 
99th Congress, 2nd sess. 
H.Doc. 643, 80th Cong., 
2d sess. (Contains latest published 
map) 
H.Doc. 643, 80th Cong., 
2d sess. 
S.Doc. 53, 86th Cong. 
1st sess. 
S.Doc. 125, 87th Cong., 
2d sess. 
S.Doc. 123, 87th Cong., 
2d sess. 
S.Doc. 138, 87th Cong., 
2d sess. 
S.Doc. 139, 87th Cong., 
2d sess. 
9-41

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 9-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Do. 
October 27, 1965 
Do. 
August 13, 1968 
Do. 
Approved 
December 17, 1970 
under the provisions 
of Section 
201 of the Flood 
Control Act of 
1965 
October 23, 1962 
December 31, 1970 
Improvement of easterly section of West Palm Beach Canal for flood 
control and major drainage 
Primary works for flood control and major drainage in southwest 
Dade County 
Primary works for flood control and major drainage in Hendry County 
Gravity drainage in Martin County and distribution of available water 
supplies to portions of Martin and St. Lucie Counties 
Improvement of supply, distribution, and conservation of water 
resources in Central and Southern Florida, including Lake Okeechobee 
agricultural area, Everglades National Park andother related 
areas. 
Navigation improvements suitable for recreational craft 
FOUR RIVER BASINS, FLA. (See Section 49 of Tbxt) 
Control of floods and improvement of drainage, and for water 
conservation through construction of necessary canals, levees, reservoirs, 
and control structures 
PORTUGUES AND BUCANA RIVERS, P.R. 
(See Section 50 of Txt) 
LAGO de CERRILLOS, P.R. 
Multiple purpose dam and lake for flood control, water supply, 
and recreation 
LAGO de PORTUGUES, P.R. 
Multiple purpose dam and lake for flood control, water supply 
and recreation 
PONCE, P.R. 
Diversion and enlargement of existing channels through Ponce for 
flood control 
S.Doc. 146, 87th Cong., 
2d sess. 
S.Doc. 20, 89th Cong., 
1st sess. 
H.Doc. 102, 88th Cong., 
1st sess. 
S.Doc. 101, 90th Cong., 
2d sess. 
H.Doc. 369, 90th Cong., 
2d sess. 
H.Doc. 394, 91st Cong., 
2d sess. 
H.Doc. 585, 87th Cong., 
2d sess. 
H.Doc. 422, 91st Cong., 
2d sess. 
9-42

JACKSONVILLE, FLA. DISTRICT 
TABLE 9-C CANAVERAL HARBOR, FLA. PROJECT 
DATA RELATIVE TO LOCK 
(See Section 5 of Text) 
Distance to nearest town 9.9 miles via 12-foot barge canal and 
Intracoastal Waterway 
Name of nearest town Cocoa, Fla. 
Distance from Intracoastal Waterway 6.5 miles 
Lock Dimensions 90' wide; 600' long' 
Lift Varies with tide 
Depth of sills (mlw, ocean) 14 feet 
Character of foundation Piles in sand 
Year completed and opened to navigation 1965 
Contract cost $2,966,539 
' 56 x 400 feet authorized. At request of NASA lock was constructed increased to 600 feet to be compatible with increased width. Opera- 
90 feet wide with NASA bearing additional cost ($700,000). Length tion and maintenance of lock is a Federal responsibility. 
TABLE 9-D CROSS-FLORIDA BARGE CANAL PROJECT 
LOCKS AND DAMS 
(See Section 8 of Text) 
Henry H. Buckman 
Lock 
Eureka Lock 
and Dam 
R. N. 
Bert Dosh 
Lock 
Nearest town 
(miles) 
Miles from Atlantic 
Intracoastal 
Waterway 
Lock dimensions (ft.)' 
Normal lift (ft.) 
Depth over sills 
at normal pool levels: 
Upper (ft.) 
Lower (ft.) 
Character of 
foundation 
Kind of dam 
Type const. 
Percent complete 
Estimated contract 
cost 
Palatka, 
11.2 
90.4 
84 x 600 
20 
14 
15 
Piles in 
sand 
Movable 
Earth3 
100 
$6.094.000 
'Clear width and greatest available length. 
2pool level varies with natural ground water profile from 
Sparr, 
15.8 
111.4 
84 x 600 
20 
17 
14 
Piles in 
sand 
Movable 
Earth3s 
100 
Ocala, 
8.9 
127.7 
84 x 600 
0-152 
16-312 
16 
Piles in 
sand 
None 
0 
Dunnellon, 
2.5 
156.5 
84 x 600 
12-272 
16-312 
18 
Rock 
None 
0 
$7,975,000 $7,430,000 $9,500,000 
Inglis, 
3.2 
168.6 
84 x 600 
28 
18 
15 
Rock 
Movable 
Earths 
100 
$7,800,000 
minimum elevation of 40 feet to maximum elevation of 55 feet. 
'With concrete spillway and movable gates. 
9-43 
Dunnellon 
Lock 
Inglis Lock 
and Dam

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 9-E CROSS-FLORIDA BARGE CANAL 
OPERATIONS AND RESULTS DURING FISCAL YEAR 
(See Section 8 of 'Tebxt) 
Work Performed Cost 
Operation and Maintenance: 
Operations of locks, operations and maintenance of 
dams, spillways reservoirs and bypasses, debris 
removal, performance monitoring system $ 502,442 
Contract maintenance of locks, grounds maintenance, 
trash removal, potable water testing 56,708 
Natural Resource Management 46,491 
Operation and maintenance of recreation facilities, 
sanitary facilities, service and maintenance of 
traffic counters and contract mainenance of grounds 296,874 
Condition and operations studies and periodic inspections 37,079 
Energy Conservation 801 
Water quality studies, data collection and processing, 
reimbursement to USGS, water control analysis, 
Lake Oklawaha and Inglis Bypass, and water 
management control 169,516 
Real Estate audits, inspections and outgrants 10,093 
OSHA medical exams 180 
Supervision and Administration 13,078 
Sub-Tobtal 1,133,262 
Maintenance: 
Maintenance of dams and spillways $ 9,908 
Maintenance of locks and lock repair contract 55,468 
Maintenance of roads, bridges 40,895 
Maintenance of permanent operating equipment (Recreation) 78,688 
Maintenance and purchase of non-recreational permanent operating 
equipment 177,078 
Bank stabilization-maintenance of slopes and berms, 
Rodman and Inglis dams, and bank 
stabilization contract. 120,399 
Maintenance of canals, clearing and snagging 89,421 
Engineering and Design 15,382 
Supervision and Inspection 446 
Real Estate encroachments 30,079 
Sub-Ibtal 617,764 
Income Credits -5,139 
Sub-Total 612,625 
Grand Total $1,745,887 
9-44

JACKSONVILLE, FLA. DISTRICT 
TABLE 9-F OKEECHOBEE WATERWAY 
OPERATIONS AND RESULTS DURING FISCAL YEAR 
(See Section 24 of Text) 
Work Performed Cost 
Operations and Maintenance: 
Operations: 
Operations of Locks, and Performance 
Monitoring System 405,837 
Contract maintenance buildings grounds, potable 
water testing, repair and replacement of project 
signs, operation and maintenance of District 
communications network 346,997 
Natural resource management 80,677 
Management of recreation areas and facilities 357,415 
Real estate management and energy conservation reports 33,992 
OSHA medical exams and inspections 1,370 
Condition and operation studies, periodic inspections 42,116 
Supervision and Administration 51,920 
Sub-Total 1,320,324 
Maintenance: 
Maintenance of locks and contract 
maintenance of locks 185,957 
Real estate acquisitions, surveys and encroachments 45,065 
Maintenance of recreational facilities and 
permanent operating equipment 55,989 
Maintenance of permanent operating equipment, nonrecreational 
80,608 
Bank Stabilization 345 
Contract operation of reservoir and dam maintenance 26,552 
Channel and canal maintenance 52,816 
Engineering and Design 37,115 
Supervision and Inspection 4,002 
Sub-Total 488,449 
Income Credits -7,325 
Total 1,801,448 
9-45

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 9-G REMOVAL OF AQUATIC GROWTH FROM NAVIGABLE WATERS 
IN THE STATE OF FLORIDA 
CONTROL OPERATIONS 
(See Section 30 of 'ext) 
Locality Acres Controlled Cost 
St. John's River and tributaries and 
Withlacoohee, Kissimmee and Crystal Rivers 15,627 $1,878,670 
Okeechobee Waterway and tributaries 3,978 599,361 
Acquisition and maintenance of airboats, 
engines, and work tools 35,150 
Income credits -402 
Operation of communications network 18,000 
OSHA medical exams -0- 
Engineering design 33,491 
Supervision and Administration 179,748 
Total 19,605 2,744,420 
TABLE 9-H NAVIGATION PROJECTS ON WHICH RECONNAISSANCE AND 
CONDITION SURVEYS ONLY WERE CONDUCTED DURING FISCAL YEAR 
(See Section 36 of 'Tebxt) 
Date Cost Incurred 
Survey During 
Project Conducted Period 
AIWW, Norfolk-St. Johns River, FL AUG 87 $159,929 
Anclote River, FL AUG 87 5,761 
Arecibo Harbor, PR OCT 86 731 
Bakers Haulover Inlet, FL JUN 86 2,098 
Cedar Keys Harbor, FL SEP 86 442 
Charlotte Harbor, FL JUL 87 888 
Christiansted Harbor, St. Croix, V.I. MAR 87 32 
Clearwater Pass, FL OCT 87 465 
Courtney Channel, FL AUG 86 486 
Crystal River, FL MAR 86 604 
Daytona Beach Side Channel, FL (IWW) JUL 87 7,968 
Horseshoe Cove, FL SEP 87 19,474 
IWW, Jacksonville-Miami, FL JUL 87 668 
Johns Pass, FL JUN 87 16,097 
Kissimmee River, FL JUL 86 1,030 
Largo Sound Channel, FL AUG 86 533 
Longboat Pass, FL AUG 87 232 
Miami Harbor, FL DEC 86 55,460 
Miami River, FL AUG 87 11,645 
New Pass, FL JUL 87 20,362 
New River, FL JUL 86 786 
Oklawaha River, FL NOV 84 1,018 
Pithlachascotee River, FL AUG 86 466 
Ponce De Leon Inlet, FL MAY 87 7,671 
Port Everglades Harbor, FL APR 87 25,694 
San Juan Harbor, PR OCT 86 2,088 
St. Lucie Inlet, FL JUL 86 4,036 
St. Johns River, Jacksonville to Lake Harney OCT 87 39 
Suwannee River, FL JAN 87 2,275 
Supervision and Administative Cost 12,709 
Total Costs 362,416 
9-46

JACKSONVILLE, FLA. DISTRICT 
OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 37 of Txt) 
For Last Cost to Sept. 30, 1987 
Full Report 
See annual Operation and 
Project Report For Construction Maintenance 
Anclote River, Fla. 1974 267,427 628,142 
Aquatic Plant Control, Fla. 
(R&H Acts of 1958 & 1962) 1968 2,619,7002- 
Atlantic Gulf Ship Canal, Fla. 1939 5,099,153- 
Bayport, Fla3 1972 58,4954 - 
Cedar Keys Harbor, Fla 1977 168,5696 70,240 
Christiansted Harbor. St. Croix. V.I.,6 1964 303,317 57,800 
Clearwater Pass, Fla.2 1 1980 46,3497 1,220,271 
Courtenay Channel, Fla' 1940 22,846 26,779 
Crystal River, Fla.? 1941 25,000 128,000 
Everglades Harbor, Fla.1 1964 221,5098 51,034 
Fajardo Harbor, P.R.3 1945 -- 
Guayanes Harbor, P.R.3 1945 -- 
Gulf Intracoastal Waterway 
St. Marks to Tampa Bay, Fla.3 1974 38,850 - 
Homosassa River, Fla.? 1937 3,9999 23,334 
Horseshoe Cove, Fla. 1977 347,521 137,493 
Hudson River, Fla.3 1974 9,889- 
Intracoastal Waterway, Miami to Key West, Fla.3 1963 243,079 28,046 
Key West Harbor, Fla? 1972 1,548,89210 534,623 
Kissimmee River, Fla.? 1931 23,479 112,954 
Lake Crescent and Dunns Creek, Fla.11 1931 10,276 9,035 
Largo Sound Channel, Fla. 1, 12 1966 117,44318 51,149 
Little Manatee River, Fla. 8, 11 1949 11,90314 - 
Manatee River, Fla. 6 1970 123,350 194,516 
New River Fla.? 1956 36,518 31,296 
Orange River, Fla. 1962 2,000 24,918 
Ozona, Fla., channel and turning basin' 1963 105,527 15,089 
Palm Beach, Fla., side channel and basin3 1946 - 
Pass-A-Grille Pass, Fla. 1, 16 1966 41,29717 60,268 
Pithlachascotee River, Fla. 1973 400,00018 261,401 
Rice Creek, Fla.? 1957 85,20819 18,814 
St. Petersburg Harbor, Fla. 1983 255,60820 1,570,45921 
St. Thomas Harbor. V.I.3 1949 1,989 - 
Steinhatchee River, Fla.1 1940 135,053 43,329 
Suwannee River, Fla. 6 1977 76,41822 219,261 
Withlacoochee River, Fla.6 1969 614,91228 370,305 
1. Complete. 
2. Excludes $918,205 contributed funds. 
3. Inactive. 
4. Includes $41,222 for reconnaissance and detailed project reports 
under Section 107 of the R&H Act of 1960. 
5. Includes $82,500 expended under previous project. Excludes 
$1,473 contributed funds. 
6. Project as modified by Chief of Engineers in report of June 
30, 1961, is complete. Previously authorized depth of 25 feet in inactive 
status. 
7. Excludes $42,783 contributed funds. 
8. Excludes $36,000 contributed funds. 
9. In addition, $1,000 expended from contributed funds. 
10. Includes $27,500 for new work under previous project. Excludes 
$35,371 contributed funds. 
11. Deauthorized by Public Law 93-251, Section 12. 
12. Authorized April 20, 1964 by Chief of Engineers under Section 
107 of 1960 R&H Act. 
13. Includes $25,008 for detailed project report but excludes $86,716 
expended from contributed funds. 
14. Expended on restudy. 
15. Inactive portion of project deauthorized by Public Law 93-251, 
Section 12. 
16. Authorized November 19, 1964 by Chief of Engineers under 
Sections 107 of R&H Act of 1960. 
17. Excludes $41,297 contributed funds. 
18. Excludes $215,728 contributed funds. 
19. Excludes $93,000 contributed funds. 
20. Includes $32,689 under previous project. 
21. Includes $20,532 under previous project. 
22. Includes $10,154 expended under previous project. 
23. Includes $30,000 expended under previous project. 
9-47 
TABLE 9-I

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 9-J 
OTHER AUTHORIZED BEACH EROSION PROJECTS 
(See Section 46 of Text) 
For Last Cost to Sept. 30, 1987 
Full Report 
See annual Operation and 
Project Report For Construction Maintenance 
Cape Florida State Park 1969 34,8621 - 
El Thque Beach, Ponce, P.R. 1985 1,396,730 - 
Key West, Fla. 1963 96,3402 3,794 
Lee County, Fla. 1971 - - 
Lido Key, Fla. 1971 - - 
Mullet Key, Fla. 1973 436,2018 1,656 
Manatee County, Fla. 1983 217,600 - 
Punta Salinas, P.R. 1984 855,5114 - 
Palm Beach County, Fla., from Lake Worth Inlet to 
South Lake Worth Inlet 1970 195,1406 6,257 
San Juan, Puerto Rico 1965 - - 
Virginia Key and Key Biscayne, Fla. 1978 1,667,2206 1,022 
1. Includes $2,462 cost of reconnaissance and detailed project 4. Excludes $360,000 contributed funds. 
reports but excludes $13,818 contributed funds. 5. Excludes $781,188 in property or services furnished by local 
2. Excludes $192,168 contributed funds. interests in lieu of cash contribution. 
3. Excludes $187,133 contributed funds. 6. Excludes $714,522 contributed funds. 
TABLE 9-K CENTRAL AND SOUTHERN FLORIDA PROJECT 
PRINCIPAL FEATURES OF HURRICANE GATES 
(See Section 48 of Text) 
Depth Character 
Over of Year 
Gate' Nearest Town Distance Sills Founda- Corn- Actual 
No. Name (miles) (ft.) tion pleted Cost 
2. Clewiston Fla. 0.5 10 Pile 1935 $309,748 
3. Lake Harbor, Fla. 0.5 10 Rock 1935 316,938 
4. Belle Glade, Fla. 4.0 10 Rock 1935 350,025 
5. Canal Point, Fla. 0.0 10 Rock 1935 262,465 
6. Okeechobee, Fla. 0.5 7 Pile 1936 373,273 
1All are 50 feet wide with available length unlimited. They are constructed 
of concrete with steel sector gates and have no lift. 
Gate No. 6 has an auxiliary culvert spillway with automatic control. 
Moore Haven Lock serves as Hurricane Gate Structure 1. 
9-48

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 9-L CENTRAL AND SOUTHERN FLORIDA PROJECT 
PRINCIPAL FEATURES OF LOCKS AND DAMS 
(See Section 48 of Text) 
Miles Elevation 
From Lock Normal of Normal Character Kind Kind 
Nearest Nearest Dimensions lift Pool Depth of of of of Percent Contract 
Town Town (ft.) (ft.) surface (ft.) sills (ft.) foundation Dam Construction Complete Cost 
W.P. Franklin At Olga 0 56 x 400 2.5 3.0 14 Piles in 
Lock and Dam1 
S-65 Lock 
S-65A Lock 
S-65B Lock 
S-65C Lock 
S-65D Lock 
c S-65E Lock 
Moore Haven 
Lock (HGS-1 
Mod.) 
S-310 
(HGS-2 Mod.) 
S-193 
(HGS-6 Mod.) 
S-308B 
(Port Mayaca) 
S-57 
S-58 
S-59 
S-60 
S-61 
S-62 
S-63 
S-63A 
S-96 
S-96A 
S-53 
S-55 
S-157 
S-158 
Frostproof 
Avon Park 
Sebring 
Sebring 
Okeechobee 
Okeechobee 
Hoore Haven 
Clewiston 
Okeechobee 
Pahokee 
Ashton 
Ashton 
Kissimmee 
Ashton 
St. Cloud 
Ashton 
Ashton 
Ashton 
Sebastian 
Sebastian 
Eau Gallie 
Christmas 
Sebastian 
Titusville 
23 
26 
20 
25 
14 
10
0.5 
0.5 
0.5 
11
9
5666 
10 
12 
14 
14 
16
8 
12
4 
15 
30 x 90 
30 x 90 
30 x 90 
30 x 90 
30 x 90 
30 x 90 
50 x 250 
50 x 60 
50 x 60 
56 x 400 
20 x 90 
20 x 90 
20 x 9Q 
20 x 90 
30 x 90 
20 x 90 
20 x 90 
20 x 90 
20 x 60 
20 x 60 
20 x 60 
20 x 60 
20 x 60 
20 x 60 
4.2 
6.3 
6.0 
7.2 
5.8 
4.6 
9.4 
5.0 
7.5 
4.0 
1.0 
2.0 
3.0 
2.0 
2.0 
3.0 
5.0 
4.5 
4.0 
7.5 
3.5 
10.0 
20.0 
4.5 
48.5-52.33 
46.3 
40.0 
34.0 
26.8 
21.0 
15.5-17.53 
15.5-17.53 
15.5-17.53 
15.5-17.53 
62.0 
64.0 
58.0 
64.0 
55.0 
61.0 
62.0 
57.0 
24.0 
25.0 
17.5 
14.0 
20.0 
4.0 
6
6
6
6
6
6 
11 
12.9 
7.5 
18
6
6
66666 
66 
6
6666 
clay 
Earth 
foundation, 
sand 
Earth 
foundation, 
sand 
Earth 
foundation, 
sand 
Earth 
foundation, 
sand 
Earth 
foundation, 
sand 
Earth 
foundation, 
sand 
Piles in 
sand 
Slab on 
sand 
Piles in 
sand and 
slab on sand 
Slab on 
sand 
Earth 
foundation, 
sand
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
Do. 
1Operation and care of W.P. Franklin Lock and Dam (S-79) is a Federal responsibility. 3The normal pool level varies seasonally between the two elevations. 2Estimated (Oct 1984). 
Movable Reinforced 
concrete 
None Reinforced 
concrete 
rigid frame 
None Reinforced 
concrete 
rigid frame 
None Reinforced 
concrete 
rigid frame 
None Reinforced 
concrete 
rigid frame 
None Reinforced 
concrete 
rigid frame 
None Reinforced 
concrete 
None Steel sheet pile 
lockwalls 
None Reinforced 
concrete 
None Reinforced 
concrete 
Fixed Reinforced 
concrete 
None Concrete and 
steel sheet 
pile 
None Do. 
None Do. 
None Do. 
None Do. 
None Do. 
None Do. 
None Do. 
None Do. 
None Do. 
None Do. 
None Do. 
None Do. 
None Do. 
Cz
r 
100 
100 
100 
100 
100 
100 
100
0 
100
0 
100
0
0
0
0 
100
000000000 
$3,803,655.00 
$1,211,464.70 
$1,531,489.91 
$1,068,396.69 
$1,357,246.12 
$1,242,908.51 
$1,320,039.84 
$369,0002 
$3,448,406 
$523,0002 
$8,308,700.00 
$2,004,0002 
$2,004,0002 
$2,000,0002 
$2,004,0002 
$689,217.00 
$2,004,0002 
$2,004,0002 
$1,962,0002 
$1,757,0002 
$1,672,0002 
$1,623,0002 
$1,664,0002 
$2,116,0002 
$1,913,0002

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 9-M CENTRAL AND SOUTHERN FLORIDA PROJECT 
LOCAL COOPERATION 
(See Section 48 of Text) 
Flood Control Act Work Authorized Cash Contributions1 
June 30, 1948 First phase of comprehensive plan 15.0 
Sept. 3, 1954 Second phase of comprehensive plan 20.0 
July 14, 1960 Nicodemus Slough area 31.5 
Oct. 23, 1962 West Palm Beach Canal 12.8 
Boggy Creek Basin 29.7 
Shingle Creek Basin 25.9 
South Dade County area 19.2 
Reedy Creek Swamp 50.0 
Oct. 27, 1965 Southwest Dade County 46.0 
Hendry County area 19.5 
Aug. 13, 1968 Martin County 
Flood Control Features 34.0 
Irrigation Features 49.0 
Backflow Features 20.0 
PL 89-72 Recreation Features 50.0 
Water Resources - St. Lucie 20.0 
Recreation Features 50.0 
Approved Dec. 17, 1970 Navigation improvements suitable for 50.0 
under Provisions of recreational craft 
Section 201 of 1965 
Flood Control Act 
1Computed on total contract cost and supervision and administration 
except for Reedy Creek Swamp and Recreation Features 
which are computed on all costs, including engineering and design 
and land. 
9-50

JACKSONVILLE, FLA. DISTRICT 
TABLE 9-N CENTRAL AND SOUTHERN FLORIDA PROJECT 
OPERATIONS AND RESULTS DURING FISCAL YEAR 
(See Section 48 of Text) 
Work Performed Cost 
New Work: 
Construction of: 
Railroad bridges $ 0 
Channels and canals 69,490 
Levees 4,020,054 
Floodway control and diversion structures 1,826,764 
Pumping Plants 0 
Buildings, grounds and utilities 0 
Cultural Resource Preservation 16,340 
Equipment operation 0 
Depreciation 0 
Engineering and design 3,559,251 
Supervision and administration 846,362 
Total cost 10,338,261 
Operations: 
Operation of locks, dams, reservoirs and performance system 479,374 
Maintenance, buildings and grounds, operation of District 
communications network, repair and replacement of project signs 252,487 
Patrol, inspection, and maintenance of Herbert Hoover Dike, 
HGS 3, 4, and 5, operation and maintenance of drainage 
ditches, culverts and 16 spillways, and mowing of levees 619,248 
Natural resource management 71,926 
Operation and Maintenance of recreation facilities, service 
and maintenance of traffic counters, master planning 306,173 
Condition and operation studies, periodic inspections, 
dam safety studies 87,881 
Water quality/water control studies, data collection, 
regulation of Lake Ockeechobee and three conservations areas 898,459 
Energy conservation 1,775 
Real Estate outgranting 7,443 
Supervision and Administration 86,155 
Sub-Total 2,810,921 
Maintenance: 
Real Estate encroachments and boundary monumentation contract 120,888 
Maintenance of locks 120,261 
Maintenance of non-recreational roads and bridges 160,061 
Repair and stabilization of Crown Road, Herbert Hoover Dike, 
removal of weeks, rebuilding and regrading of levee slopes, 
modification and maintenance of safety barriers, HGS 3, 4 and 5, 
cleaning landslide toe ditches, repair of culverts, replacement 
of fences, removal of trees, topping of trees, control of 
Melaleuca, replacement of rip rap on slopes and berms 575,227 
Maintenance of recreational facilities 28,739 
Maintenance of recreational roads and bridges 34,527 
Maintenance of hydrometrological network 46,660 
Maintenance and purchase of non-recreational permanent operating 
equipment 204,489 
Bank stabilization contract 234,390 
Maintenance of non-recreational roads and bridges 12,800 
Non-dredging channel maintenance and debris removal 3,093 
Engineering and Design 56,457 
Supervision and Inspection 109,434 
Income credits -2,704 
Sub-Total 1,709,026 
Total 4,517,243 
Special recreation user fees 80,860 
9-51

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 9-0 CENTRAL AND SOUTHERN FLORIDA PROJECT 
CONSTRUCTION COMPLETED UNDER EXISTING PROJECT DURING FISCAL YEAR 
(See Section 48 of Text) 
Date transferred to 
Flood Control District 
Construction for Operation and 
Feature Period Maintenance 
Channels and Canals: 
C-51 East End May 1982 - June 1987 
Structures: 
S-155 May 1982 - June 1987 
TABLE 9-P CENTRAL AND SOUTHERN FLORIDA PROJECT 
STATUS OF WORK UNDER CONTRACT AT END OF FISCAL YEAR 
(See Section 48 of Text) 
Construction Approx. % 
Feature Started Complete 
Levees: 
Herbert Hoover Dike Revetment 
1st Contract (4 miles) March 1983 100 
3rd Contract February 1985 45 
4th Contract July 1985 90 
5th Contract August 1986 25 
6th Contract December 1986 70 
Structures: 
HGS-4 Replacement (S-351) January 1986 70 
HGS-5 Replacement (S-352) April 1987 36 
9-52

JACKSONVILLE, FLA. DISTRICT 
FOUR RIVER BASINS, FLORIDA PROJECT 
MOSS BLUFF LOCK 
(See Section 49 of Text) 
Nearest town 
Name of nearest town 
Distance above mouth of River 
Lock dimensions 
Normal lift 
Elevation of normal pool surface 
Depth of sills 
Character of foundation 
Kind of dam 
Tyrpe of construction 
Percent complete 
Estimated Cost (including dam and spillway) 
20 miles 
Ocala, Fla. 
65.5 miles 
30 x 125 feet 
18.0 feet 
58 feet 
12 feet 
Piles in sand 
None 
Reinforced concrete 
100 
$1,990,138 
TABLE 9-R FOUR RIVER BASINS, FLORIDA PROJECT 
CONDITION AT END OF FISCAL YEAR 
(See Section 49 of Text) 
Date transferred to 
Construction Southwest Florida 
Feature Period for Operation and Maintenance 
Bridges: 
B-194 
Alteration of Facilities B-195 
B-594 
Alteration of Facilities B-196 
SCL RR Br., B-196 
Channels and Canals: 
C-135 
C-135, Sec. 1A 
C-135, Sec. 1B 
C-135, Sec. 1C & 2 
C-135, Sec. 3A 
C-135, Sec. 3B 
C-135, Sec. 4A 
C-136 
C-231, Phase I 
C-231, Phase II 
C-331 
C-531 
C-534 
C-135 
Structures: 
S-160 
S-161 
S-162 
S-353 
Moss Bluff Lock and Spillway 
S-551 
Levees: 
L-212, Sec. 1 
L-212, Sec. 2 
L-112 
L-112 & Floodway 
S-155 
S-163 
S-159 Middle & Lower 
S-159 Upper 
Recreation: 
Morris Bridge & 
Flint Creek Sites 
Dead River Sites 
July 1968 - Mar. 1970 
May 1971 - Jan. 1973 
Jan. 1973 - Jan. 1974 
Oct. 1972 - Jan. 1975 
Dec. 1972 - July 1975 
May 1967 - Dec. 1968 
July 1966 - Aug. 1967 
May 1968 - Sep. 1972 
Jan. 1971 - Dec. 1973 
Dec. 1972 - Apr. 1975 
Feb. 1975 - Aug. 1977 
Apr. 1976 - Jan. 1979 
Aug. 1975 - May 1977 
July 1973 - Apr. 1975 
July 1973 - Jan. 1974 
July 1967 - Sep. 1968 
Apr. 1966 - Jan. 1969 
June 1970 - July 1971 
March 1977 - Oct. 1980 
May 1967 - Dec. 1968 
Aug. 1975 - May 1977 
Apr. 1975 - June 1977 
July 1967 - Sep. 1968 
Apr. 1967 - Mar. 1969 
July 1970 - Feb. 1972 
June 1968 - July 1970 
July 1970 - Sep. 1971 
March 1977 - Oct. 1980 
May 1978 - July 1981 
May 1978 - July 1981 
May 1978 - July 1981 
April 1979 - Aug. 1981 
June 1979 - Sep. 1981 
December 1982 - August 1984 
March 1985 - July 1986 
Not transferred 
Do. 
Do. 
Do. 
July 1975 
Dec. 1968 
Oct. 1967 
Not transferred 
Not transferred 
Oct. 1977 
Not transferred 
Not transferred 
Nov. 1977 
Dec. 1975 
Dec. 1975 
Sep. 1968 
Apr. 1969 
Nov. 1971 
Dec. 1968 
Nov. 1977 
Apr. 1977 
Nov. 1968 
Dec. 1975 
Not transferred 
Dec. 1975 
Dec. 1975 
Oct. 1980 
Jan. 1983 
Jan. 1983 
Jan. 1983 
Oct. 1981 
Jan. 1985 
Dec. 1986 
9-53 
TABLE 9-Q 
_ ___

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 9-S OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 52 of Text) 
For Last Cost to Sept. 30, 1985 
Full Report 
See Annual Operation and 
Project Report For Construction Maintenance 
Arch Creek, Dade County, Fla. 1960 $66,4851- 
Biscayne Bay, Fla., Hurricane Protection2 1966 - - 
Hillsborough Bay, Fla.2 1969 - - 
Phillippi Creek Basin, Fla.2 1966 - - 
1. Excludes $11,734 cost of preauthorization studies. Project was 2. Deauthorized by Public Law 93-251, Section 12. 
authorized February 20, 1959, by Chief of Engineers under Section 
205 of the 1948 Flood Control Act as Modified by P.L. 685, 84th 
Congress. 
TABLE 9-T FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
PURSUANT TO SECTION 205, PUBLIC LAW 685, 
(PREAUTHORIZATION) 
(See Section 53 of Text) 
Study Identification Period Costs 
Detailed Project Report: 
Alligator Creek Basin, CL Fla. $ 6,566 
Bear Creek, Pinellas County, Fla. 2,643 
Curiosity Creek, Tampa, Fla. 7,396 
Crane Creek, Melbourne, Fla. 16,620 
Lagrange Gut, Frederiksted, VI. 7,485 
Manatee River, Manatee County, Fla. 7,489 
Naquabo River, P.R. 86,056 
Rio Anton Ruiz-Runta Santiago, P.R. 31,209 
Rio Cibuco, Vega Baja, P.R. 66,861 
Rio Descalabrada, Santa Isabel 6,090 
Rio Manati, Barceloneta, P.R. 2,043 
Rio Niqua, Arroyo, P.R. 47,250 
Rio Tallaboa-Penuelas, P.R. 432 
Sabana Grande, P.R. 497,027 
Savan Gut-St. Thomas, V.I. 1,317,650 
Seminole Basin-Largo, Fla. 13,581 
Sion Farm, St. Croix, V.I. 7,336 
Strawberry Hill, St. Croix, V.I. 7,475 
Sugar Creek, Valdosta, Ga. 21,519 
lhrpentine Run, St. Thomas, V.I. 52,372 
Wares Creek, Bradenton, Fla. 4,137 
9-54

MOBILE, AL., DISTRICT * 
This district comprises a small portion of southeastern 
Tennessee, western Georgia, western Florida, 
all of Alabama south of Tennessee River Basin, eastern 
Mississippi, and a small portion of southeastern Louisiana 
embraced in drainage basins tributary to the Gulf of 
Mexico, west of Aucilla River Basin, to and including 
the Pascagoula River Basin. The Pearl River Basin, 
Mississippi was included as part of the Mobile District 
until 1 October 1981, when responsibilities were transferred 
to Vicksburg District, Lower Mississippi Valley 
Division. A section of the Gulf Intracoastal Waterway 
from St. Marks, Florida, to Lake Borgne Light No. 29, 
Louisiana is also within Mobile District. 
IMPROVEMENTS 
Navigation 
1. Apalachicola Bay, FL .................. 
2. Aquatic Plant Control (R&H Act 
of 1965) ............................. 
3. Bayou Coden, AL .................... 
4. Bayou La Batre, AL ................ 
5. Biloxi Harbor, MS .................... 
6. Biloxi Harbor, East Harrison 
County Canal, MS .................... 
7. Black Warrior and Tombigbee 
Rivers, AL .......................... 
8. Bon Secour River, AL ................ 
9. Dauphin Island Bay, AL ............... 
10. Dog and Fowl Rivers, AL ............. 
11. East Pass Channel from Gulf of Mexico 
into Choctawhatchee Bay, FL ........... 
12. Fly Creek, Fairhope, AL ............... 
13. Gulf Intracoastal Waterway 
between Apalachee Bay, FL 
and Mexican Border (Mobile 
D istrict) ............................ 
14. Gulfport Harbor, MS ................. 
15. Mobile Harbor, AL .................. 
16. Panama City Harbor, FL ............. 
17. Pascagoula Harbor, MS ............. 
18. Pensacola Harbor, FL ................ 
19. Perdido Pass Channel, AL ........... 
20. Tombigbee River at 
Columbus Port, MS ................. 
21. Waterway Connecting Tombigbee and 
Tennessee Rivers, AL and MS ........ 
22. Other Authorized Navigation 
Projects ............................ 
23. Navigation Work Under Special 
Authorization ...................... 
24. Reconnaissance and Condition 
Surveys ............................ 
Page Deauthorized Projects 
10-3 25. Deauthorized Projects ............... 
Beach Erosion Control 
10-3 26. Other Authorized Beach Erosion 
1100--43 Control Project ..................... 
10-4 27. Beach Erosion Control Projects 
Under Special Authorization .......... 
10-5 Flood Control 
28. Okatibbee Lake, MS ................ 
10-5 29. Tallahala Creek Lake, Pascagoula 
10-6 River, M S ......................... 
10-6 30. Big Brown Creek and 
10-7 Tributary, Prentiss Co., MS .......... 
31. Boligee Canal Boligee, AL ............. 
10-7 32. Chattahoochee River, Eufaula, AL ..... 
10-7 33. Goodfood Creek, Chickasaw Co., MS ... 
34. Highway 39 Bridge, Gainesville, AL .... 
35. Houston School Rd. Bridge 
Itawamba Co., MS ................... 
10-8 36. Leaf and Bowie Rivers, 
10-9 Hattiesburg, MS .................... 
10-9 37. Martin Creek, Prentiss Co., MS ....... 
10-10 38. Murder and Burnt Corn Creeks, 
10-10 Brewton, AL ....................... 
10-11 39. Noxubee River Relief Bridge, 
10-11 Shuqualak, MS ..................... 
40. Sewerline Protection, 
10-12 Valley, AL ......................... 
41. Sope Creek, 
10-12 Marietta, GA ....................... 
42. Tallabinella Creek, 
10-13 Chickasaw Co., MS .................. 
43. Tombigbee River (East Fork), 
10-13 MS and AL ........................ 
44. Tombigbee River Tributaries, 
10-13 MS and AL ........................ 
10-1 
Page 
10-13 
10-13 
10-13 
10-13 
10-13 
10-14 
10-14 
10-14 
10-14 
10-14 
10-15 
10-15 
10-15 
10-15 
10-16 
10-16 
10-16 
10-16 
10-16 
10-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
45. Old Highway 82 Bridge, 
Columbus, MS ..................... 
46. Interstate 59 Bridges, 
Fosters, AL ........................ 
47. Inspection of Completed Flood 
Control Projects .................... 
48. Other Authorized Flood 
Control Projects .................... 
49. Flood Control Work Under 
Special Authorization ................ 
Multiple Purpose Projects 
Including Power 
50. Alabama-Coosa Rivers, 
AL and GA ........................ 
50A. Carters Lake, GA ................... 
0SOCB.l aiborne Lock and Dam, AL ......... 
SOC. Robert F. Henry Lock and Dam, AL ... 
SOD. Millers Ferry Lock and Dam, 
A L ................................ 
50E. Coosa River Navigation .............. 
Page 
51. Allatoona Lake, Coosa River 
10-17 Basin, GA .......................... 
52. Apalachicola, Chattahoochee, 
10-17 and Flint Rivers, 
AL, GA, and FL ..................... 
10-17 52A. Buford Dam, GA ................... 
52B. George W. Andrews Lock and 
10-18 Dam, AL and GA ................... 
52C. Jim Woodruff Lock and Dam, GA 
10-18 and FL ............................ 
52D. Walter F. George Lock and Dam, 
AL and GA ........................ 
52E. West Point Lake, Chattahoochee 
River Basin, GA and AL ............. 
53. Scheduling Flood Control 
10-18 Reservoir Operations ................ 
10-19 
10-19 
10-19 
General Investigations 
54. Surveys ... ....................... 
10-20 55. Collection and Study of Basic 
10-20 D ata .............................. 
Tables 
Table 10-A 
Table 10-B 
Table 10-C 
Table 10-D 
Table 10-E 
Table 10-G 
Table 10-H 
Table 10-I 
Table 10-J 
Cost & Financial 
Statement .................. 
Authorizing Legislation ....... 
Other Authorized 
Navigation Projects .......... 
Other Authorized Beach 
Erosion Control Projects ...... 
Other Authorized Flood 
Control Projects ............. 
Deauthorized Projects ........ 
Navigation Work Under 
Special Authorization ........ 
Beach Erosion Control 
Projects Under Special 
Authorization ............... 
Flood Control Work Under 
Special Authorization ......... 
10-25 
10-31 
10-41 
10-41 
10-42 
10-42 
10-43 
10-43 
10-43 
Table 10-K 
Table 10-L 
Table 10-M 
Table 10-N 
Table 10-0 
Table 10-P 
Reconnaissance and 
Condition Surveys ............ 10-44 
Alabama-Coosa Rivers, AL 
and GA Development Proposed 
Under Existing Project ........ 10-44 
Apalachicola, Chattahoochee, 
and Flint Rivers, AL, GA and FL, 
Locks and Dams and Multiple- 
Purpose Development Included 
in Existing Project ............ 10-45 
Black Warrior and 
Tombigbee Rivers, AL ........ 10-46 
Tennessee-Tombigbee 
Waterway, MS and AL ........ 10-47 
Completed Flood Insurance 
Studies and Flood Hazard 
Information Reports .......... 10-48 
10-2 
Page 
10-20 
10-21 
10-22 
.10-22 
10-22 
10-23 
10-23 
10-24 
10-24 
10-24

MOBILE, ALABAMA DISTRICT 
Navigation 
1. APALACHICOLA BAY, FL. 
Location. The project is on the coast of northwest 
Florida 160 miles east of Pensacola Harbor. (See Coast 
and Geodetic Survey Chart 11401.) 
PreVious project. For details, see page 1833, Annual 
Report for 1915, and page 689, Annual Report for 1938. 
Existing project. The authorized project provides for: 
(a) A channel 10 feet deep and 100 feet wide from the 
10-foot depth in Apalachicola Bay, across St. George 
Island, to within 300 feet of the gulf shore, thence 
increasing uniformly in width to 200 feet at the shore 
and continuing with that width to the 10-foot depth in 
the Gulf of Mexico, with twin jetties extending from the 
dune line to the outer end of the channel; (b) an inner 
bar channel, 10 feet deep and 100 feet wide, in Apalachicola 
Bay; (c) a boat basin 200 feet by 880 feet and 
nine feet deep at Apalachicola, Florida, with a connecting 
channel 9 feet deep and 80 feet wide through 
Scipio Creek to Apalachicola River; (d) a channel 
known as Link Channel, 10 feet deep and 150 feet wide, 
in Apalachicola Bay; (e) a channel generally parallel to 
the shore at Eastpoint, Florida, 6 feet deep, 100 feet 
wide, and about 6,000 feet long, and a connecting 
channel 6 feet deep and 100 feet wide to water at the 
same depth in St. George Sound, with twin breakwaters 
on either side parallel to the shore and having a total 
length of 5,300 feet; (f) a channel 10 feet deep and 100 
feet wide through Bulkhead Shoals, connecting 
Apalachicola Bay with St. George Sound; and (g) a 
6-foot by 100-foot channel about one mile long, generally 
parallel to the shore at Two Mile, Florida, with a 
6-foot by 100-foot connecting channel to water of the 
same depth in Apalachicola Bay. Mean range of tide 
throughout this harbor is 1.6 feet. Extreme range, 
except during storms, is about three feet. Plane of 
reference is mean low water. (See Table 10-B for 
authorizing legislation.) 
Local cooperation. Requirements have been fully 
complied with. 
Terminal facilities. Facilities consist of pile-andtimber 
wharves which are considered adequate for 
existing commerce. 
NOperations and results during fiscal year. New work: 
None. 
Maintenance: Condition surveys and other miscellaneous 
costs amounted to $55,015. 
Condition at end of fiscal year. The existing project, 
authorized by the 1954 River and Harbor Act, was 
completed in 1959, including reimbursement to local 
interests for approved work, as authorized by the 1958 
River and Harbor Act. Improvements at Two Mile 
except for modifications authorized in 1975 were completed 
in September 1964. Construction of the breakwater 
and channel improvements authorized in 1975 at 
Two Mile was completed in September 1977. Construction 
of breakwaters at Eastpoint authorized in 1983 was 
completed in March 1984. Total Federal costs under 
existing project as of September 30, 1987 were 
$1,898,848 for new work and $3,471,627 for maintenance, 
a total of $5,370,475. 
2. AQUATIC PLANT CONTROL (RIVER 
AND HARBOR ACT OF 1965) 
Location. Navigable water, tributary streams, connecting 
channels and other allied waters in Mobile 
District. 
Existing project. The authorized project provides for 
management and control of water hyacinth, alligatorweed, 
Eurasian watermilfoil, hydrilla, and other obnoxious 
aquatic plant growths from navigable water, 
tributary streams, connecting channels, and other allied 
waters of the United States, in the combined interest of 
navigation, flood control, drainage, agriculture, fish 
and wildlife conservation, public health, and related 
purposes, including continued research for development 
of the most effective and economical control 
measures to be administered by the Chief of Engineers, 
under the direction of the Secretary of the Army, in 
cooperation with other Federal and State agencies. 
Research and planning cost prior to construction shall 
be borne fully by the United States. (See Table 10-B for 
authorizing legislation.) 
Local cooperation. Local interests shall agree to hold 
and save the United States free from claims that may 
occur from control operations and to participate to the 
extent of 30 percent of such operations. Requirements 
are being met in the state of Alabama. 
Operations and results during fiscal year. Engineering 
and design costs and work on channels and 
canals amounted to $37,674. 
Condition at end of fiscal year. Total Federal costs 
under the existing project as of September 30, 1987 were 
$565,837. Contributed funds for maintenance amount 
to $21,225. 
3. BAYOU CODEN, AL 
Location. The project is located in a small tidal 
stream on the southern coast of Mobile County, Alabama, 
emptying into Mississippi Sound about 7.6 miles 
northwest of Cedar Point, the southern tip of western 
mainland shore of Mobile Bay. (See Coast and Geodetic 
Survey Chart 11376.) 
Previous project. For details see Annual Report for 
1945, page 843. 
Existing project. The project provides for a channel 
eight feet deep by 60 feet wide extending from La Belle 
Avenue bridge south for about 3,000 feet through the 
bayou to Portersville Bay, thence eight feet deep by 100 
10-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
feet wide extending about 2.3 miles westward across 
Portersville Bay to connect with the Bayou La Batre 
channel, and a turning basin eight feet deep by 60 feet 
wide by 100 feet long on the west side of the bayou 
channel about 500 feet south of the La Belle Avenue 
bridge. Mean tidal range is 1.75 feet, and extreme, 
except during storms, is 3.5 feet. Plane of reference is 
mean low water. (See Table 10-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Small privately-owned pile-andtimber 
piers used in connection with fishing industry in 
this locality are adequate for existing commerce. A 
marina which will accommodate about 12 small recreational 
craft, and a slip with facilities for loading oyster 
shells are located near the mouth of the bayou, and are 
maintained by the Alabama Department of Conservation. 
Operations and results during fiscal year. New work: 
None. 
Maintenance: Condition and operation studies cost 
$15,327. Supervision and administration of maintenance 
features cost $924. 
Condition at end of fiscal year. That portion of the 
project authorized prior to the 1969 modification was 
completed in 1956. Construction authorized in 1969 was 
initiated 31 March 1975 and completed 26 March 1976. 
Total Federal costs under existing project as of September 
30, 1987 were $325,051 for new work and 
$746,642 for maintenance, a total of$1,071,693. Contributed 
funds expended for new work amount to $100,000 
and $50,000 for maintenance. 
4. BAYOU LA BATRE, AL 
Location. Bayou La Batre is a tidal stream about 10 
miles long, emptying into Mississippi Sound on the 
southern coast of Mobile County, Al., about 10 miles 
northwest of Cedar Point, the southern tip of the 
western mainland shore of Mobile Bay. (See Coast and 
Geodetic Survey Chart 11373.) 
Previous project. For details see Annual Report for 
1945, page 844. 
Existing project. The authorized project provides for 
a 12-foot by 100-foot channel from the 12-foot depth in 
Mississippi Sound to a point about 2,800 feet south of 
the highway bridge, thence a channel 12 feet deep by 75 
feet wide to the bridge, an overall distance of about 
33,500 feet, with the channel widened at a point 0.6 mile 
below the bridge to provide a turning basin 12 feet deep 
and about 2.6 acres in area. Mean tidal range is 1.75 feet, 
and extreme, except during storms, is 3.75 feet. Plane of 
reference is mean low water. (See Table 10-B for 
authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Wooden wharves have been provided 
at seafood processing plants and public launching 
ramps are available. Facilities are considered adequate 
for existing commerce. 
Operations and results during fiscal year. Condition 
and operation studies cost $45,802. Water control 
management cost $4,386. Supervision and administration 
and other miscellaneous costs total $486. 
Condition at end of fiscal year. The existing project 
was modified December 30, 1966 under the discretionary 
authority of the Chief of Engineers to include a 
turning basin. The project was completed in March 
1967. Total Federal costs under existing project as of 
September 30, 1987 were $311,095 for new work and 
$3,065,996 for maintenance, a total of $3,377,091. 
Contributed funds from local interests for new work 
amount to $10,500. 
5. BILOXI HARBOR, MS 
Location. The project is located on Mississippi 
Sound in southeastern Mississippi, 32 miles by water 
west of Pascagoula Harbor, Mississippi, and 14 miles 
east of Gulfport Harbor, Mississippi (See Coast and 
Geodetic Survey Chart 11373.) 
Previous project. For details see page 584, Annual 
Report for 1962. 
Existing project. The authorized project provides for 
a continuous channel 12 feet deep, 150 feet wide and 23 
miles long from the Gulf Intracoastal Waterway through 
Mississippi Sound east of Deer Island, Biloxi Bay, Back 
Bay, Cranes Neck, and a land cut to Gulfport Lake, 
including a 500-foot by 2,600-foot basin in the lake, 
thence a 12-foot deep by 100-foot wide channel for 
about two miles westward from the west end of the lake, 
terminating in a 300-foot by 500-foot basin; a 12-foot by 
100-foot channel from the main channel in Big Lake to 
and up Bayou Bernard to the Air Force oil terminal at 
about mile 2.6; a 12-foot by 150-foot spur channel from 
the main channel in Biloxi Bay for about one mile, 
terminating in a 400-foot by 600-foot turning basin 
opposite Ott Bayou; continuation of maintenance of the 
12- by 150-foot lateral channel westward about 2.2 miles 
to Biloxi's south waterfront; a 10-foot by 150-foot 
channel from Mississippi Sound, passing west of Deer 
Island to a point where it connects to the 12-foot by 
150-foot lateral channel at Biloxi's south waterfront. 
Construction for the modifications lateral channel 
authorized by River and Harbor Act of Nov. 7, 1966 
was commenced in FY 1974 and completed in Feb. 
1975. Further modifications to the project Were authorized 
by the Chief of Engineers on 28 March 1979, which 
provided for a channel 10 feet deep, 100 feet wide and 
300 feet long extending northward from the Biloxi 
Lateral Channel, and into a rectangular basin, approximately 
300 by 370 feet. This work was completed 
in April 1980. 
Cost of modification as authorized by the 1966 River 
and Harbor Act was $664,390. That portion of the 
10-4

MOBILE, ALABAMA DISTRICT 
project providing for an entrance channel 6 feet deep, 50 
feet wide, and about 1,800 feet long into Old Fort 
Bayou, as authorized by the 1945 River and Harbor 
Act, is inactive. Estimated cost (1954) of this 
portion was $6,000. (See Table 10-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. A number of wooden piling-andtimber 
piers for small craft and fishing boats, a bulk 
gasoline terminal, several boat ways, and concrete 
products plant are available. 
Operations and results during fiscal year. New work: 
None. 
Maintenance: Contract dredging removed 412,900 
cubic yards of material at a cost of $216,218. Other work 
on channels and canals cost $67. Condition surveys cost 
$249,734. Engineering and design cost $16,859. Water 
control management and miscellaneous supervision 
and administration costs total $27,223. 
Condition at end of fiscal year. The existing project, 
prior to the modification authorized in 1966, was commenced 
in 1931 and completed in 1962. The 1966 
modification was completed in FY 4975. The 1979 
modification was completed in FY 1980. Total Federal 
costs under existing project as of 30 September 1987 
were $1,171,054 for new work and $8,102,769 for 
maintenance, a total of $9,273,823. Contributed funds 
for new work amount to $102,600. Contributed funds 
for maintenance amount to $238,640. 
6. BILOXI HARBOR, 
EAST HARRISON COUNTY 
CANAL, MS 
Location. Biloxi Harbor is located on Mississippi 
Sound in southeastern Mississippi, approximately 75 
miles east of New Orleans, Louisiana, and 45 miles west 
of Mobile Bay, Alabama. The City of Biloxi is situated 
on a peninsula bounded by Mississippi Sound on the 
south, Biloxi Bay on the east, and Back Bay of Biloxi on 
the north. 
Existing project. The project provides for the improvement 
and maintenance of the East Harrison County 
Canal to a 12-foot project depth, 130 feet wide, and 
about 2,100 feet long, and a 300- by 300-foot turning 
basin also to a 12-foot project depth. (See Table 10-B for 
authorizing legislation.) 
Local cooperation. Fully complied with. 
Operation and results during fiscal year. New work: 
Project construction was initiated and essentially completed 
during FY 1986. Minor administrative costs 
during FY 1987 total $723. 
Condition at end of fiscal year. Total cost of construction 
as of September 30, 1987 amounts to $216,483. 
7. BLACK WARRIOR AND 
TOMBIGBEE RIVERS, AL 
Location. Black Warrior River rises in northern Alabama 
above Birmingham and flows generally southwesterly 
to unite with the Tombigbee River at Demopolis, 
Alabama. Thence the Tombigbee flows south, uniting 
with the Alabama River to form the Mobile River 45 
miles above the head of Mobile Bay. Distance by water 
from Mobile to the vicinity of Birmingham is about 415 
miles. 
Previous project. For details see page 732, Annual 
Report for 1938. 
Existing project. The authorized project provides essentially 
for a channel 9 feet deep and 200 feet wide from the 
mouth of the Tombigbee River, 45 miles above Mobile, 
to the vicinity of Birmingham, via the Tombigbee and 
Black Warrior Rivers, to mile 430.4 on Sipsey Fork, 
mile 429.6 on Mulberry Fork and mile 407.8 on Locust 
Fork, and for maintenance by snagging of Mobile River 
above the mouth of Chickasaw Creek, a total waterway 
distance of about 408 miles. The total lift of 255 feet is 
accomplished by six locks and dams. The original 
construction program, consisting of 17 dams with 18 
lifts, was completed in 1915. Replacement of the 
original structures with new locks and dams, under the 
modernization program is as follows: William Bacon 
Oliver replaced locks 10, 11, and 12; Demopolis replaced 
locks 4, 5, 6, and 7; Armistead I. Selden replaced locks 8 
and 9; Coffeeville (Jackson) replaced locks 1, 2, and 3; 
and Holt replaced locks 13, 14, 15, and 16. Thus, 16 of 
the original locks have been replaced by five new locks. 
Bankhead Lock and Dam (Lock 17) rehabilitation to 
replace the original double lift lock with a single lift lock 
was completed in 1980. The Coffeeville Lock and Dam 
wildlife refuge, authorized in 1960, includes 4,250 acres 
within the reservoir area and along its boundaries. A 
replacement for the old Oliver Lock has been authorized 
and will be located 2,300 feet downstream. The replacement 
lock will have dimensions of 110 feet by 600 feet. A 
fixed crest spillway will extend 815 feet across the river. 
Minimum provision will be provided to allow construction 
of a hydropower plant. (See Table 10-B for 
authorizing legislation.) 
Tidal influence extends upstream from Mobile 101.6 
miles to the old lock 1, where tidal effect is apparent 
only at low stages of the river. At Mobile the mean and 
extreme tidal ranges are 1.5 and 3.6 feet, respectively. 
These are at times slightly increased by the effect of 
winds. The greatest fluctuation of river stages is at 
Demopolis, Ala., the maximum being 59.7 feet. Maximum 
fluctuations at other points are 40 feet at lock 
1,100.6 miles from Mobile; 57.8 feet at Tuscaloosa, 
346.1 miles from Mobile; 13 feet at Birmingport, 404.9 
miles from Mobile; and 27 feet at Cordova, 424.3 miles 
from Mobile. Ordinary fluctuations at these points are 
at old lock 1, 20 feet; at Demopolis, 35 feet; at 
Tuscaloosa, 40 feet; at Birmingport, four feet; and at 
Cordova, seven feet. Works of improvement reduced 
the amount of fluctuations at different points by three to 
10 feet. 
Local cooperation. Requirements of local cooperation 
have been fully complied with to date. 
10-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Terminal facilities. Docks, storage facilities, and handling 
equipment have been provided as required at most 
loading and unloading points along the waterway. 
These include facilities for handling petroleum and 
petroleum products, coal, ores, sand and gravel, pulpwood, 
manufactures, and various other commodities. 
While most terminal facilities are privately owned, 
many are available for use by the general public. 
Facilities are considered adequate for existing commerce. 
(See Table 10-N for existing locks and dams.) 
Operations and results during fiscal year. 
New work: Miscellaneous costs in connection with 
the modification of Franklin Ferry Bridge were $129,693. 
Construction costs for the new Oliver Lock and Dam 
total $12,759,767. Recreation facilities at Demopolis 
cost $29,220. Recreation attendance during CY 1986 
totaled 6,834,900. 
Maintenance: Contract dredging of the river system 
cost $6,280,871. Condition surveys cost $592,305. Engineering 
and design cost $416,951. Supervision and 
administration and other general charges for the overall 
river project totaled $2,087,020. 
Other maintenance costs for the system include: 
Coffeeville Lock and Dam, $565,573; Demopolis Lock 
and Dam, $947,524; Selden Lock and Dam, $459,820; 
Oliver Lock and Dam, $398,182; Bankhead Lock and 
Dam, $522,482; Holt Lock and Dam, $914,691; and 
reservoir operation, $1,808,187. 
Condition at end of fiscal year. Work on the project, 
commenced in 1887, was essentially completed in 1915. 
Since then three of the original locks and dams (10, 11 
and 12) were replaced by William Bacon Oliver (Tuscaloosa) 
Lock and Dam which was opened to navigation 
in August 1939; four original locks and dams (4,5,6 and 
7) were replaced by Demopolis Lock and Dam which 
was opened to navigation in August 1954; two original 
locks and dams (8 and 9) were replaced by Warrior Lock 
and Dam which was opened to navigation in October 
1957; three original locks and dams (1, 2 and 3) were 
replaced by Coffeeville Lock and Dam which was 
opened to navigation in August 1960; and four original 
locks and dams (13, 14, 15, and 16) were replaced by 
Holt Lock and Dam which was opened to navigation in 
June 1966. Rehabilitation of the spillway at John Hollis 
Bankhead Lock and Dam commenced in 1966, and 
physically completed 6 February 1970. Replacement of 
the double lift lock with a single lift lock at John Hollis 
Bankhead Lock and Dam commenced in April 1970 
and was completed in 1980. The cost to September 30, 
1987 for replacement of the lock was $47,258,651. The 
power plant at John Hollis Bankhead Lock and Dam 
was built and is operated by the Alabama Power Co. 
Engineering and design and land acquisition for the new 
Oliver Lock and Dam are essentially complete. Project 
construction began in November 1986 and is scheduled 
for completion in 1992. Total Federal costs under 
existing project as of September 30, 1987 were 
$122,838,504 for new work and $192,950,212 for maintenance, 
and $47,258,651 for major rehabilitation, a total 
of $240,208,863. 
8. BON SECOUR RIVER, AL 
Location. Rises 2 miles south of Foley, Ala., and 
flows southerly about 8 miles, emptying into Bon 
Secour Bay, an arm of Mobile Bay in southwest 
Alabama. 
Existing project. A 10- by 80-foot channel from Gulf 
Intracoastal Waterway through Bon Secour Bay to 
mouth of Bon Secour River and extending up river to 
vicinity of Swifts Landing, thence 6 by 80 feet up river to 
a point about 600 feet above Oak Landing with two 
turning and maneuvering areas 150 feet wide and 1,100 
to 1,200 feet long opposite Swifts Landing and ice loading 
dock. Plane of reference is mean low water. Overall 
length of improvement is about 4.7 miles. Mean tidal 
range is about 1.5 feet and extreme, except during 
storms, is 3.5 feet. Existing project was authorized by 
Chief of Engineers, May 16, 1963, under authority in 
Section 107, River and Harbor Act of 1960. 
Local cooperation. Fully complied with. 
Terminal facilities. A number of pile-and-timber 
marginal wharves used by the seafood industry and a 
marine ways are located along the existing project. 
These, together with numerous privately owned piers, 
are considered adequate for existing commerce. 
Operations and results during fiscal year. Maintenance: 
Condition surveys and supervision and administration 
cost $71,942. 
Condition at end of fiscal year. Project was commenced 
in July and completed in October 1964. Total 
Federal costs under existing project as of September 30, 
1987 were $118,615 for new work and $269,511 for 
maintenance, a total of $388,126. Contributed funds for 
new work amounted to $9,700. 
9. DAUPHIN ISLAND BAY, AL 
Location. The project is located between Dauphin 
and Little Dauphin Island on the west side of the 
entrance to Mobile Bay, about 30 miles south of 
Mobile, Alabama and 55 miles west of Pensacola, Florida. 
(See Coast and Geodetic Survey Chart 11376.) 
Existing project. The authorized project provides for: 
(a) A channel seven feet deep and 150 feet wide from 
Mobile Bay to an anchorage basin of the same depth, 
and about seven acres in area, in the marsh just north of 
Fort Gaines on Dauphin Island; a channel four feet 
deep and 40 feet wide from the anchorage basin to 
Dauphin Island Bay; and a jetty and revetment to 
protect the entrance channel; and (b) an anchorage 
basin seven feet deep and 500 feet square at Dauphin 
Island Village, with an entrance channel of like depth, 
100 feet wide and about 8,300 feet long, extending to the 
7-foot hydrographic contour in Mississippi Sound. 
Mean tidal range is 1.1 feet, and extreme, except during 
storms is about four feet. Plane of reference is mean low 
water. (See Table 10-B for authorizing legislation.) 
10-6

MOBILE, ALABAMA DISTRICT 
Local cooperation. Requirements of local cooperation 
have been fully complied with to date. 
Terminal facilities. Several privately-owned wharves 
for handling seafood, a public dock and mooring slip, 
and a pier for recreational craft are located on the 
village basin. A marina, public launching ramp, and a 
number of private piers are located on the bay. Facilities 
are considered adequate for existing commerce. 
Operations and results during fiscal year. New Work: 
None. 
Maintenance: Work on channels and canals cost 
$32,349. Condition surveys cost $28,830. Water control 
management and other miscellaneous costs amounted 
to $18,519. 
Condition at end of fiscal year. The project was 
completed in July 1959. Total Federal costs under 
existing project as of September 30, 1987 were $292,864 
for new work and $1,393,639 for maintenance, a total of 
$1,686,503. 
10. DOG AND FOWL RIVERS, AL 
Location. Dog and Fowl Rivers are primarily tidal 
streams emptying into the west side of Mobile Bay, 8.5 
and 17 miles, respectively, south of central Mobile. (See 
Coast and Geodetic Survey Chart 11376). 
Existing project. The Dog River project provides for 
a 7 by 100-foot channel to provide access to the Mobile 
ship channel. The total length to be dredged is 3,300 
feet. 
The Fowl River project provides for a channel eight 
feet deep and 100 feet wide from Mobile Bay into and up 
Fowl River to deep water about 6,700 feet above its 
mouth. Total length of the channel is about 2.6 miles. 
Plane of reference is mean low water. Mean range of 
tide is about 1.5 feet in Dog River. Extreme range 
during storms is about 3.6 feet. This segment of the 
project was completed in November, 1973. (See Table 
10-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Existing facilities consist of a 
boatyard for fabricating steel vessel hulls, nine marinas, 
four marine ways, a yacht basin on Dog River; two 
marinas on Fowl River, and numerous timber piers and 
docks on both rivers. Facilities are considered adequate 
for existing commerce. 
Operations and results during fiscal year. New work: 
Dredging of the Dog River Channel to specifications 
was completed in September 1986. The city of Mobile 
constructed the disposal dikes and contributed $81,150 
for the recreation use of the project. Federal costs 
during FY 1987 amounted to $60,784. 
Maintenance: Routine maintenance of channels and 
canals cost $21,143. Condition surveys and water 
control management cost $29,096. Supervision and 
administration and miscellaneous costs total $39,968. 
Condition at end of fiscal year. The existing Fowl 
River portion of the project was commenced in August 
1973 and completed in November 1973. Work on the 
Dog River channel was initiated and essentialy completed 
during FY 1986. Total Federal costs on the 
existing project as of September 30, 1987 were 
$2,271,046; $376,101 for new work and $1,894,945 for 
maintenance. Contributed funds for new work 
amounted to $195,250. 
11. EAST PASS CHANNEL FROM 
GULF OF MEXICO INTO 
CHOCTAWHATCHEE BAY, FL 
Location. East Pass Channel is located in the entrance 
from the Gulf into Choctawhatchee Bay at eastern end 
of Santa Rosa Island, 48 miles east of the entrance into 
Pensacola Bay and 49 miles west of the new entrance to 
St. Andrews Bay. (See Coast and Geodetic Survey 
Chart 11388.) 
Previous project. For details see page 672 of Annual 
Report for 1937. 
Existing project. The authorized project provides for 
a 12-foot by 180-foot channel from the Gulf of Mexico 
into Choctawhatchee Bay, and a 6-foot by 100-foot 
channel from East Pass Channel into Old Pass Lagoon. 
The project consists also of two converging jetties 
spaced 1,000 feet apart at the seaward end. The west 
jetty is provided with a low weir section 1,000 feet long 
to permit passage of littoral drift into a dredged 
deposition basin 500 feet by 1,500 feet located between 
the west jetty and the navigation channel. Mean range 
of tide is 1.3 feet; extreme range, except during storms, 
is 2.5 feet. Plane of reference is mean low water. (See 
Table 10-B for authorizing legislation.) 
Local cooperation. Responsibilities of local cooperation 
have been complied with to date. 
Terminal facilities. Small privately-owned pile-andtimber 
piers used in connection with the fishing industry 
in this locality are considered adequate for existing 
commerce. 
Operations and results during fiscal year. Maintenance: 
Contract dredging removed 357,100 cubic yards 
of material at a cost of $61,943. Condition surveys cost 
$111,614. Supervision and administration cost $116,180. 
Engineering and design and miscellaneous costs totaled 
$47,435. 
Condition at end of fiscal year. Construction of the 
1965 modification was commenced October 1967 and 
completed January 1969. Total Federal costs under 
existing project as of September 30, 1987 were $916,715 
for new work and $7,306,127 for maintenance, a total of 
$8,222,842. Contributed funds for new work from local 
interests amount to $398,000. 
12. FLY CREEK, AL 
Location. Fly Creek (Volanta Bayou) is a small 
stream about 4.5 miles long rising in Baldwin County, 
Ala., 3 miles east of town of Fairhope, from whence it 
flows northerly, thence westerly and southerly, to form 
an estuary on eastern shore of Mobile Bay just north of 
10-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Fairhope and about 13 miles southeast of Mobile, Ala. 
(See U.S. Coast and Geodetic Survey Chart No. 11376.) 
Existing project. Provides for a channel 6 feet deep, 
80 feet wide, and about 1,650 feet long from 6-foot 
depth in Mobile Bay to a turning basin of same depth, 
100 feet wide and 350 feet long, in Fly Creek. Mean tidal 
range in vicinity of project is about 1.3 feet, and 
extreme, except during storms, is 3.5 feet. 
Existing project was authorized by the River and 
Harbor Act of May 17, 1950, (H. Doc 194, 81st Cong., 
1st Sess.). The project document contains the latest 
published map. 
Local cooperation. Fully complied with. 
Terminal facilities. Fairhope Yacht Club has facilities 
for small recreational craft on both banks near mouth of 
creek, consisting of a small pile-and timber service 
wharf, several sheet metal boat sheds, boat slips, and 
other mooring facilities. There is also a marginal timber 
wharf and shed for commercial fishing boats on right 
bank of creek immediately above first bend. 
Operations and results during fiscal year. Maintenance:. 
Contract dredging removed 12,470 cubic yards 
of material from Fly Creek and Pass Drury at a cost of 
$38,558. Condition surveys cost $23,355. Supervision 
and administration and miscellaneous costs totaled 
$17,342. 
Condition at end of fiscal year. Project was commenced 
in August and completed in October, 1957. 
Total project costs as of September 30, 1987 amounted 
to $431,617 of which $29,000 was for new work and 
$402,617 for maintenance. 
13. GULF INTRACOASTAL 
WATERWAY BETWEEN 
APALACHEE BAY, FL 
AND MEXICAN BORDER 
(MOBILE DISTRICT) 
Location. The project extends westward from Apalachee 
Bay, Florida, along the Gulf coast to the Rigolets, 
Louisiana, via a series of coastal lakes, bays, sounds, 
and land cuts. (For further details see Annual Report 
for 1962.) 
Previous project. For details see page 906, Annual 
Report for 1930. 
Existing project. The authorized project provides for 
a waterway 12 feet deep and 125 feet wide at mean low 
water from Apalachee Bay, Florida, to Mobile Bay, 
Alabama, and 12 feet deep and 150 feet wide from 
Mobile Bay, Alabama to Rigolets, Louisiana (Lake 
Borgne Light No. 29), and for a tributary channel (Gulf 
County Canal), 12 feet deep, 125 feet wide and about six 
miles long connecting Intracoastal Waterway at White 
City, Florida, with St. Joseph Bay. The waterway 
between the 12-foot depth contours in Apalachee Bay 
and Lake Borgne Light No. 29 at the Rigolets is 379 
miles long. (See Table 10-B for authorizing legislation.) 
Local cooperation. Responsibilities of local cooperation 
have been fully complied with for the work 
authorized prior to 1966. For modification of the Gulf 
County Canal which was authorized by the 1966 River 
and Harbor Act, local interests must provide without 
cost to the United States all lands, easements, and 
rights-of-way required in connection with disposal of 
spoil, or the costs of such retaining works; hold and save 
the United States free from all damages due to construction 
and maintenance of the project including 
damages to wharves, piers, bridges, and other structures; 
provide and maintain at local expense adequate 
terminal and transfer facilities open to all on equal 
terms; provide and maintain without cost to the United 
States depths in berthing areas commensurate with 
depths provided in related project area; and accomplish 
without cost to the United States such alterations as 
required in sewer, water supply, drainage, and other 
facilities as well as their maintenance. 
Terminal facilities. Facilities are available for public 
use at Carrabelle, Apalachicola, Panama City, and 
Pensacola, Florida; Mobile and Bayou LaBatre, Alabama; 
and Pascagoula, Biloxi, Gulfport, Pass 
Christian, and Bay St. Louis, Mississippi. Facilities are 
considered adequate for existing commerce. 
Operations and results during fiscal year. 
Maintenance: 
Carrabelle-Apalachicola Bay section: Condition surveys, 
water control management and miscellaneous 
costs totaled $28,942. 
Apalachicola Bay - St. Andrew Bay section: Condition 
surveys cost $97,813. Routine maintenance of 
channels and canals cost $45,679. Supervision and 
administration and miscellaneous costs totaled $20,707. 
St. Andrew Bay - Choctawhatchee Bay section: Bank 
stabilization cost $362,063. Contract dredging removed 
149,200 cubic yards of material at a cost of $376,961. 
Condition surveys cost $103,045. Engineering and design 
cost $46,674. Supervision and administration and 
miscellaneous costs totaled $194, 819. 
Choctawhatchee Bay - Pensacola Bay section: Condition 
surveys cost $53,960. Water control management 
and supervision and administration costs totaled 
$19,914. 
Pensacola Bay - Mobile Bay section: Routine maintenance 
of channels and canals cost $504,563. Condition 
surveys cost $223,065. Supervision and administration 
and miscellaneous costs totaled $55,407. 
Mobile Bay - Rigolets section: Condition surveys, 
water control management and supervision and administration 
cost $189,274. In addition, compliance inspections 
cost $388,238; direct charges to Mobile Area 
Office cost $199,448; and direct charges to Panama City 
Area Office were $15,522. 
Condition at end of fiscal year. The existing project is 
complete except for the portion between Apalachicola 
10-8

MOBILE, ALABAMA DISTRICT 
Bay and St. Marks, Florida, which has been deauthorized. 
Modification of the Gulf County Canal to 
provide a 12-foot by 125-foot channel was commenced 
July 1968 and completed June 1969. Total costs of the 
existing project to September 30, 1987 were $54,515,480, 
of which $6,434,694 was for new work and $48,080,786 
for maintenance. 
14. GULFPORT HARBOR, MS 
Location. The project is located on Mississippi 
Sound in southeastern Mississippi, about 35 miles west 
of Pascagoula, Mississippi, and 60 miles east of New 
Orleans. (See Coast and Geodetic Survey Chart 11373.) 
Previous project. For details see page 747, Annual 
Report for 1938, and page 995, Annual Report for 1948. 
Existing project. The authorized project provides for: 
(a) A channel 32 feet deep, 300 feet wide, and about 
eight miles long across Ship Island Bar, a channel 30 feet 
deep, 220 feet wide, and about 11 miles long through 
Mississippi Sound, and an anchorage basin at Gulfport 
30 feet deep, 1,320 feet wide, and 2,640 feet long; and (b) 
maintenance of the existing commercial smallboat 
harbor about 26 acres in area, and a straight-approach 
channel, 100 feet wide and about 4,300 feet long, from 
deep water in Mississippi Sound to a small-boat basin, 
all at a depth of eight feet. Under ordinary conditions 
mean tidal range is about 1.75 feet, and extreme range, 
except during storms, is about 3.5 feet. Plane of 
reference is mean low water. It is proposed to modify the 
existing ship channel to 36 x 600 feet in Mississippi 
Sound, and 38 x 400 feet across the bar, with changes in 
the channel alignment and the entrance to the anchorage 
basin for safe and unrestricted navigation. (See Table 
10-B for authorizing legislation.) 
Local cooperation. Conditions of local cooperation 
have been fully complied with to date. 
Terminal facilities. Existing modern rail-connected 
terminal facilities at this port are considered adequate 
for existing commerce. (See Port Series 19, revised in 
1979.) 
Operations and results during fiscal year. Maintenance 
: Contract dredging removed a total of 4,212,100 
cubic yards of material from the outer bar, the sound 
and the harbor channel and anchorage basin, all at a 
cost of $1,331,434. Condition surveys cost $285,368. 
Engineering and design costs totaled $28,106. Supervision 
and administration and miscellaneous costs 
amounted to $89,006. 
Condition at end of fiscal year. The main harbor was 
commenced 1932 and completed April 1950. Maintenance 
for small boat harbor and approach channel, 
constructed by local interests in 1950, was authorized by 
1958 River and Harbor Act. Total Federal costs under 
existing project as of September 30, 1987 were $635,758 
for new work and $33,165,703 for maintenance, a total 
of $33,801,461. 
15. MOBILE HARBOR, AL 
Location. The project is located along the lower five 
miles of Mobile River, in southwestern Alabama, 91 
miles by water west of Pensacola Harbor, Florida, 90 
miles east of Gulfport Harbor, Mississippi, and 144 
miles by water northeast of mouth of Mississippi River. 
(See Coast and Geodetic Survey Chart 11376.) 
Previous project. For details see page 503, Annual 
Report for 1963. 
Existing project. The authorized project provides for: 
(a) A 42-foot by 600-foot channel about 1.5 miles long 
across Mobile Bar; (b) a 40-foot by 400-foot channel in 
Mobile Bay to mouth of Mobile River; (c) a 40-foot 
channel in Mobile River to highway bridge, varying 
from 500 to 775 feet wide; (d) a 25-foot channel from 
highway bridge to and up Chickasaw Creek to a point 
400 feet south of mouth of Shell Bayou, widths being 
500 feet in Mobile River and 250 feet in Chickasaw 
Creek; (e) a turning basin 40 feet deep, 2,500 feet long, 
and 800 to 1,000 feet wide, opposite Alabama State 
Docks; (f) a turning basin 40 feet deep, 1000 feet wide, 
and 1,600 feet long opposite Magazine Point; (g) a 
27-foot by 150-foot channel from Mobile Bay Channel 
along Arlington pier to a turning basin 800 feet long and 
600 feet wide opposite Brookley Complex ocean terminal, 
and continuing thence to a turning basin 250 feet 
wide and 800 feet long in Garrows Bend, thence a 22- 
foot by 150-foot channel to the causeway linking 
McDuffie Island to the mainland; (h) a channel 40 feet 
deep and 400 feet wide from the main ship channel in 
Mobile Bay and extending northwesterly for about 5.3 
miles to the shore of Mobile Bay, including an anchorage 
basin near the shoreline, thence a land cut 40 feet 
deep, 300 feet wide and 1.9 miles long to and including a 
42 acre trapezoid turning basin 40 feet deep, and a barge 
channel 12-by 100-feet, extending 6500 feet and terminating 
in a 300-by 300-foot turning basin; and (i) 
maintenance of Three Mile Creek by snagging, from its 
intersection with Industrial Canal to Mobile River. The 
project provides also for an anchorage area 32 feet deep, 
100 feet wide, and 2,000 feet long opposite site formerly 
occupied by the U. S. Quarantine Station at McDuffie 
(Sand) Island. Prior to widening the Mobile Bay 
Channel as authorized in 1954, the Quarantine Station 
anchorage area was maintained to a project width of 200 
feet. Construction by local interests of a solid-fill 
causeway across Garrows Bend Channel between 
McDuffie Island and the mainland is also provided for 
under existing project. Total length of the bay and river 
channels is about 41.7 miles. Plane of reference is mean 
low water. Under ordinary conditions mean tidal range 
at the lower end of the improvement is 1.2 feet and at the 
upper end 1.5 feet. Extreme tidal range is 3.4 feet at the 
lower end and 3.6 feet at the upper end. Further 
authorization provides for future development to deepen 
and widen entrance channel over the bar to 57 feet by 
700 feet about 7.4 miles long, deepen and widen bay 
channel to 55 feet by 550 feet about 27.0 miles long, 
deepen and widen an additional 4.2 miles of bay channel 
to 55 feet by 650 feet and provide 55 foot deep 
anchorage area and turning basin in vicinity of Little 
10-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Sand Island. All dredged material will be placed in an 
approved disposal area in the Gulf of Mexico. (See 
Table 10-B for authorizing legislation.) Although the 
authorized project is for the construction of a 55 foot by 
550 foot channel, the current proposed plan of improvement 
consists of deepening the entrance channel from 
42 feet to 47 feet for a distance of 6. 1 miles from the Gulf 
of Mexico to Mobile Bay; and deepening the bay 
channel from 40 feet to 45 feet from the mouth of the 
bay north for a distance of 31.2 miles to the McDuffie 
Coal Terminal. 
Local cooperation. A local cooperation agreement 
was signed by the local sponsor to construct the project 
in increments. The first increment is described above. 
Terminal facilities. Modern rail-connected terminal 
facilities at this port are considered adequate for 
existing commerce. (See Port Series No. 18, revised in 
1979.) 
Operations and results during fiscal year. New work: 
Engineering and design for Mobile Harbor cost 
$444,538. 
Maintenance: Contract dredging removed 833,950 
cubic yards of material from Mobile Harbor and 
Theodore ship channel at a cost of $2,837,449. Condition 
surveys cost $1,128,836. Water control management, 
engineering and design and supervision and administration 
cost $793,294. 
Condition at end of fiscal year. The existing project 
was commenced in 1931 and completed in July 1965 
except for the Theodore Channel portion, which was 
essentially completed in August 1981. For details see 
Annual Report for 1965. Total Federal costs under 
existing project as of September 30, 1987 were 
$61,952,193 for new work and $83,131,631 for maintenance, 
a total of $145,083,824. Contributed funds 
expended amounted to $7,745,408 for new work and 
$846,706 for maintenance. 
16. PANAMA CITY HARBOR, FL 
Location. The project is located on the northwest 
coast of Florida, 102 miles east of entrance to Pensacola 
Harbor. (See Coast and Geodetic Survey Chart 11389.) 
Previous project. For details see page 710, Annual 
Report for 1938. 
Existing project. The authorized project (as modified) 
provides for a channel about 3.7 miles long 
extending from deep water in St. Andrew Bay to the 
Gulf of Mexico, 300 feet wide and 40 feet deep in the bay 
and 450 feet wide, 42 feet deep and about 1.1 miles long 
in the approach channel in the Gulf, protected by two 
jetties, each about 700 feet long; branch channels 38 feet 
deep and 300 feet wide, leading from the inner end of the 
main entrance channel westward to the Port Authority 
terminal at Dyers Point and eastward to the Bay Harbor 
terminal, about 3.4 and 3.6 miles in length, respectively; 
turning and maneuvering areas comprising about 55 
acres opposite Dyers Point, and 42 acres opposite Bay 
Harbor, both at a depth of 38 feet; and an anchoring and 
loading basin for LASH type intermodal carriers, 40 
feet deep and containing about 177 acres in St. Andrew 
Bay near the inner end of the main entrance channel; a 
channel in Watson Bayou, 100 feet wide and 10 feet deep 
from that depth in St. Andrew Bay to the highway 
bridge, about 1.75 miles; channel 100 feet wide and 8 
feet deep in Grand Lagoon to a point about 2,400 feet 
east of State Highway 392 Bridge, with branches to 
serve terminal facilities. The east and west jetties have 
been reworked and are presently about 2,075 and 2,896 
feet long, respectively. Mean tidal range is about 
normally 1.3 feet and 3.0 feet extreme. (See Table 10-B 
for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Available terminal facilities are 
considered adequate for existing commerce. (See Port 
Series No. 19.) 
Operations and results during fiscal year. New work: 
None. 
Maintenance: Condition surveys cost $87,639. Engineering 
and design, water control management and 
miscellaneous costs totaled $36,090. 
Condition at end of fiscal year. The existing project 
(prior to modifications) was completed in November 
1949. Repairs to jetties were commenced in June 1961 
and completed October 1968. Modifications to the 
project at Grand Lagoon were completed in January 
1972. Total Federal costs under existing project as of 
September 30, 1987 were $1,434,485 for new work and 
$6,697,007 for maintenance, a total of $8,131,492. 
Contributed funds expended for new work amount to 
$80,000. 
17. PASCAGOULA HARBOR, MS 
Location. The project is located along lower 6.8 miles 
of Pascagoula River, the lower six miles of Dog River, 
and in Bayou Casotte (about four miles east of the 
mouth of Pascagoula River), in southeastern Mississippi, 
about 38 miles west of Mobile, Alabama, and 
about 100 miles east of New Orleans, Louisiana. (See 
Coast and Geodetic Survey Chart 11373.) 
Previous project. For details see page 741, Annual 
Report for 1938. 
Existing project. The authorized project provides for 
(a) An entrance channel 40 feet deep and 350 feet wide 
from the Gulf of Mexico through Horn Island Pass, 
including an impounding area for littoral drift, 40 feet 
deep, 200 feet wide, and about 1,500 feet long adjacent 
to the channel at the west end of Petit Bois Island; (b) a 
channel 38 feet deep and 350 feet wide in Mississippi 
Sound and Pascagoula River to the railroad bridge at 
Pascagoula, including a turning basin 2,000 feet long 
and 950 feet wide (including channel area) on the west 
side of the river below the railroad bridge; (c) a channel 
38 feet deep and 225 feet wide from the ship channel in 
Mississippi Sound to the mouth of Bayou Casotte, 
thence 38 feet deep and 300 feet wide for about one mile 
to a turning basin 38 feet deep, 1,000 feet wide, and 
10-10

MOBILE, ALABAMA DISTRICT 
1,750 feet long; (d) a 22-foot deep by 150-foot wide 
channel up Pascagoula River from the railroad bridge 
to the mouth of Escatawpa (or Dog) River, then up 
Escatawpa River to Highway 613 (formerly 63) bridge; 
(e) a 12-foot by 125-foot channel from the highway 
bridge, via Robertson and Bounds Lakes, to mile 6 on 
Escatawpa River; and (f) a 12-foot by 80-foot channel 
extending from deep water in the Pascagoula River 
(about one-half mile north of the railroad bridge) to a 
turning basin in Krebs Lake a distance of about 1,500 
feet, then along the south bank of the lake a channel 
10-foot by 60-foot and terminating at a second turning 
basin, a distance of 2,700 feet from the first. Under 
ordinary conditions mean tidal range is 1.75 feet, and 
extreme range is 3.75 feet. Plane of reference is mean 
low water. (See Table 10-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Modern rail-connected terminal 
facilities at this port are considered adequate for 
existing commerce. (See Port Series No. 19.) 
Operations and results during fiscal year. Maintenance: 
Contract dredging removed 503,800 cubic yards 
of material from the Channel, River and Sound at a 
total Federal cost of $1,882,792. Condition surveys cost 
$468,513.Water control management, supervision and 
administration, and miscellaneous costs totaled 
$242,666. 
Condition at end of fiscal year. The existing project 
was completed in August 1965 and the Krebs Lake 
project was completed in November 1983. Total Federal 
costs of existing project to September 30, 1987 were 
$5,668,543 for new work and $38,514,721 for maintenance, 
a total of $44,183,264. Contributed funds expended 
for maintenance amounted to $2,035,676. 
18. PENSACOLA HARBOR, FL 
Location. The project is located in a landlocked bay 
on the coast of northwest Florida about 50 miles east of 
the entrance to Mobile bay. (See Coast and Geodetic 
Survey Charts 490 and 11382.) 
Previous project. For details see Annual Report for 
1938. 
Existing project. The authorized project provides for: 
(a) A 35-foot by 500-foot entrance channel about five 
miles long, from the Gulf of Mexico to lower Pensacola 
Bay; (b) a 33-foot by 300-foot bay channel; (c) two 
33-foot by 300-foot parallel approach channels to 
opposite ends of the inner-harbor channel; (d) an innerharbor 
channel 500 feet wide, 33 feet deep, and 3,950 
feet long; (e) a 30-foot by 250-foot approach channel to 
the pierhead line south of Muscogee wharf; and (f) a 
15-foot by 100-foot entrance channel into Bayou Chico, 
thence a channel 14 feet deep, 75 feet wide, and about 
4,400 feet long to a turning basin 14 feet deep and 500 
feet square. Mean range of tide throughout the harbor is 
about 1.1 feet near the entrance and about 1.6 feet at the 
head of bay. Extreme tidal range, except during storms, 
is about three feet. Plane of reference is mean low water. 
Modification of the Bayou Chico project to provide for 
enlarging the entrance channel to 21 by 100 feet, the 
bayou channel to 20 feet by 100 feet, and deepening the 
turning basin to 20 feet has been deferred for restudy. 
(See Table 10-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Modern rail-connected terminal 
facilities at this port are considered adequate for existing 
commerce. (See Port Series No. 19, revised in 1979.) 
Operations and results during fiscal year. Maintenance: 
Condition surveys cost $83,330. Water control 
management and miscellaneous costs totaled $31,194. 
Condition at end of fiscal year. New work is completed 
except those features which are deferred for restudy. 
The modification authorized in 1962 was commenced 
in March and completed in May 1965. Total 
Federal costs of the existing project to September 30, 
1987 were $875,005 for new work and $6,164,147 for 
maintenance, a total of $7,039,152. 
19. PERDIDO PASS CHANNEL, AL 
Location. The project is located about midway 
between Pensacola, Florida and Mobile, Alabama. (See 
Coast and Geodetic Chart 11378.) 
Existing project. The existing project provides for a 
channel 12 feet deep and 150 feet wide for about 1,300 
feet from the Gulf of Mexico into the inlet, thence nine 
feet deep and 100 feet wide for about 2,200 feet to the 
highway bridge, where the channel branches into two 
arms, each having dimensions of 9 by 100 feet, one of 
which extends about 3,400 feet into Terry Cove and the 
other about 3,200 feet into the southern arm of Perdido 
Bay. The project also provides for two jetties spaced 600 
feet apart at the seaward end. The east jetty has a low 
weir section, 1,000 feet long to permit passage of littoral 
drift into a dredged deposition basin 800 feet by 1,200 
feet located between the east jetty and the navigation 
channel. Mean tidal range is 1.1 feet and extreme is 2.8 
feet. (See Table 10-B for authorizing legislation.) 
Local cooperation. Requirements of local cooperation 
have been fully complied with to date. 
Terminal facilities. Six marinas, numerous timber 
piers, docks, and several launching ramps are available. 
These facilities are considered adequate for existing 
commerce. 
Operations and results during fiscal year. Maintenance: 
Condition surveys cost $25,740. Water control 
management and miscellaneous costs totaled $1,690. 
Condition at end of fiscal year. The existing project 
was commenced in May 1968 and completed in March 
1969. Total Federal costs of the existing project to 
September 30, 1987 were $629,860 for new work and 
$5,974,854 for maintenance, a total of $6,604,714. Contributions 
from local interest amount to $510,000 for 
new work and $10,325 for maintenance. 
10-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
20. TOMBIGBEE RIVER 
AT COLUMBUS PORT, MS 
Location. The project is located in east-central 
Mississippi at the site of Lowndes County Industrial 
Park in Columbus, MS, about 131 miles northeast of 
Jackson, MS. The industrial park is located in the 
Aliceville Pool of the Tennessee-Tombigbee Waterway. 
The entrance to the project channel is located about 
4,000 feet upstream of the confluence of the Tenn-Tom 
Waterway and Luxapalila Creek. 
Existing project. The Tenn-Tom Waterway (TTWW), 
authorized in the River and Harbors Act of 1945, 
extends from Demopolis, AL to the Tennessee River in 
northeast Mississippi. The Columbus Port project 
provides for a navigation channel 100 feet wide by 9 feet 
deep from the juncture of the old Tombigbee River 
channel and the TTWW upstream for about 1.5 miles to 
the port. This reach of the TTWW is known as the 
Aliceville Lake. The work will also include construction 
of a 200-foot by 200-foot wide turning basin at the port. 
About one acre of land will be removed at the entrance 
to the proposed channel to enhance vessel access into 
the port. (See Table 10-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Construction of a public terminal 
and waterfront industrial park with road and rail access 
and appropriate utility services has been completed. 
Operations and results during fiscal year. New work: 
Construction costs total $452,535. 
Condition at end of fiscal year. Project construction 
was begun and essentially completed during FY 1987 at 
a Federal cost of $452,535. Contributed funds expended 
amounted to $53,000. 
21. WATERWAY CONNECTING 
TOMBIGBEE AND TENNESSEE 
RIVERS, AL AND MS 
Location. The waterway extends from mile 215 in 
Pickwick pool on the Tennessee River, southerly through 
northeastern Mississippi and western Alabama, a total 
of 234 miles, to the confluence of the Black Warrior and 
Tombigbee Rivers at Demopolis, Alabama. 
Location. For details see Annual Report for 1953. 
Existing project. The authorized project provides for 
a waterway 234 miles long, connecting the Tennessee 
and Tombigbee Rivers via the East Fork of Tombigbee 
River and Mackeys and Yellow Creeks. The plan of 
improvement consists of three sections. (1) the river 
section, a 9-foot by 300-foot channel for 149 miles 
between Demopolis and Amory, Mississippi; (2) the 
lateral canal section, 12 feet by 300 feet for 46 miles from 
Amory to Bay Springs; and (3) the divide section, a 
12-foot by 300-foot channel (except in the 27 mile-long 
divide cut in which the bottom width would be 280 feet) 
for 39 miles from Bay Springs through the dividing 
ridge to the Tennessee River; the total lift of 341 feet to 
be accomplished by 10 locks. (See Table 10-B for 
authorizing legislation.) 
Local cooperation. Local interests must make and 
maintain alterations in highways and highway bridges 
and in sewer, water-supply, and drainage facilities and 
provide and maintain suitable and adequate river and 
canal terminals. Officials of the State of Mississippi 
were notified of these requirements on December 13, 
1949, and officials of the State of Alabama were notified 
on December 20, 1949. Legislation enabling boards of 
supervisors of the various counties concerned to enter 
into agreements with the United States relative to 
navigation projects was adopted by the State of Mississippi 
in 1950. A compact between the States of Alabama, 
Mississippi, Tennessee, Kentucky and Florida has been 
formed for the purpose of promoting the project. The 
name of this organization is the Tennessee-Tombigbee 
Waterway Development Authority. 
During its 1962 session the Mississippi Legislature 
authorized the formation of the Tombigbee River 
Valley Water Management District. The District was 
organized in accordance with the enabling legislation 
and is empowered to fulfill the requirements of local 
cooperation for the portion of the project in Mississippi. 
A satisfactory resolution has been furnished. During its 
1967 session the Alabama Legislature authorized 
formation of a public corporation to be named the 
Tombigbee Valley Development Authority for the 
purpose of further development of the Tombigbee River 
and tributary streams. The organization was formed in 
accordance with the enabling legislation and in a 
referendum held 5 December 1967 the voters of Alabama 
authorized a bond issue not to exceed $10,000,000 to 
finance participation in this project and the Tombigbee 
River and Tributaries project. A satisfactory resolution 
has been furnished. 
Terminal facilities. Docks, storage facilities and handling 
equipment are still being developed along this new 
waterway. As of September 30, 1987, only twelve such 
facilities were operational, while four were under construction, 
and five more are planned. The operational 
facilities are handling grain, wood chips, and logs. 
When all facilities are complete, about half will be 
publicly owned and operated. Additional ports and 
terminals must be completed before the waterway can 
achieve its full potential. (See Table 10-N for existing 
locks and dams.) 
Operations and results during fiscal year. New work: 
Total cost of new work during the fiscal year was 
$15,256,360 of which $2,573 was for work on Demopolis 
Lake; $49,570 for Gainesville Lock and Dam; 
$4,521,358 for Aliceville Lock and Dam; $1,038,062 for 
Columbus Lock and Dam; $1,315,783 for Aberdeen 
Lock and Dam. Canal section cost included: Lock A, 
$124,022; Lock B, $3,316,692; Lock C, $171,019; Lock 
D, $142,792; Lock E, $1,104,712. Other costs associated 
with the overall project amounted to $3,469,777. Contributed 
funds amounted to $4,035. Maintenance: Contract 
dredging was performed on the river system and 
10-12

MOBILE, ALABAMA DISTRICT 
rocks removed from the bendways at a total cost of 
$3,855,879. Cost for operation of the completed portion 
of the project during the year amounted to $18,765,500, 
which included general charges of $10,593,387; Gainesville 
Lock and Dam, $498,598; Aliceville Lock and 
Dam, $526,544; Columbus Lock and Dam, $369,471; 
Aberdeen Lock and Dam, $369,185; Lock A, $306,333; 
Lock B, $324,514; Lock C, $313,581; Lock D, $345,771; 
Lock E, $321,817; Bay Springs, $1,110,384; lake charges 
of $3,685,915. Recreation attendance for CY 1986 
totaled 4,033,200 user days. 
Condition at end of fiscal year. Total Federal costs 
under the existing project as of September 30, 1987 were 
$988,386,269 for new work, and $65,829,802 for maintenance 
for a total of $1,054,216,071. Construction formally 
began December 12, 1972 and overall project is 
about 96 percent complete. The waterway was opened 
for navigation in January 1985. 
22. OTHER AUTHORIZED 
NAVIGATION PROJECTS 
(See Table 10-C.) 
23. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Section 107, Public 
Law 86-645, as amended (Preauthorization). Studies 
conducted under this authority amounted to $568,236. 
(See Table 10-H.) 
24. RECONNAISSANCE AND 
CONDITION SURVEYS 
(See Table 10-K.) 
25. DEAUTHORIZED PROJECTS 
(See Table 10-G.) 
Beach Erosion Control 
26. OTHER AUTHORIZED BEACH 
EROSION CONTROL PROJECT 
(See Table 10-D.) 
27. BEACH EROSION CONTROL 
PROJECTS UNDER 
SPECIAL AUTHORIZATION 
Studies conducted under Section 103,1962 River and 
Harbor Act, as amended, amounted to $11,541. (See 
Table 10-I.) 
Flood Control 
28. OKATIBBEE LAKE, MS 
Location. The project is located on Okatibbee Creek 
37.7 miles above its mouth, in Lauderdale County, 
Mississippi, seven miles northwest of Meridian. 
Existing project. The project provides for a dam and 
reservoir for flood control, water supply, water quality 
control, fish and wildlife, and recreation. The dam 
consists of a compacted earth fill 6,540 feet long with the 
top elevation 369.8 feet above national geodetic datum, 
with top width of 18 feet. The spillway, which is located 
1,500 feet east of the east end of the dam, is an unpaved 
free overflow type, 1,500 feet long with a fixed crest at 
elevation 359. A sluice intake structure near the center 
of the dam serves a 9.0-foot diameter concrete conduit. 
Storage allocated for water supply and water quality 
control varies seasonally from 21,400 acre-feet to 34,300 
acre-feet between a minimum elevation of 328 and topof-
conservation-pool elevation varying from 339 to 343. 
Storage varying from 46,500 to 59,500 acre-feet between 
the top of the conservation pool and elevation 352 has 
been reserved exclusively for storage of flood waters. 
(See Table 10-B for authorizing legislation.) 
Local cooperation. Complied with to date. 
Operations and results during fiscal year. New Work: 
Minor administrative costs total $283. 
Maintenance: Costs for the year for ordinary maintenance 
and recreational management amount to 
$1,020,843. Benefits attributed to flood control storage 
and regulation amounted to $694,835. Recreation attendance 
at the reservoir during CY 1986 totaled 
1,196,285 recreational user days. 
Condition at end of fiscal year. Construction began in 
June 1965, and was completed in November 1968. Total 
Federal costs of the existing project as of September 30, 
1987 were $9,739,455 for new work and $9,293,461 for 
maintenance, a total of $19,032,916. 
29. TALLAHALA CREEK LAKE, 
PASCAGOULA RIVER, MS 
Location. The project is on Tallahala Creek, 81,1 
miles above its mouth, in Jasper County, Mississippi, 13 
miles north of Laurel. 
Existing project. The project provides for a dam and 
reservoir for flood control, water supply, water quality 
control, recreation, and fish and wildlife enhancement. 
The dam will consist of a compacted earth fill 8,000 feet 
long, with top elevation 343.5 feet above national 
geodetic datum, or a maximum 71.5 feet above streambed 
elevation, with a top width of 18 feet, and a 300-foot 
long saddle dike with maximum height of 15 feet in the 
left abutment. The spillway which is 6,000 feet northeast 
of the left abutment, will consist of an unpaved, freeoverflow 
type, 500 feet long, with fixed crest at elevation 
335.0. A sluice intake structure near the center of the 
dam will serve an 8-foot diameter, horseshoe-shaped 
concrete conduit. The reservoir at maximum pool 
elevation 306.5 will have an area of 4,000 acres and a 
total capacity of 63,000 acre-feet of which 35,900 acrefeet 
between elevations 288.5 and 302.0 will be used for 
water supply, 20,000 acre-feet between elevations 302.0 
and 306.5 will be used for water quality improvement, 
and 7,100 acre-feet below elevation 288.5 will consist of 
10-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
dead storage. A volume varying seasonally from 50,000 
to 70,000 acre-feet between elevations 306.5 and 315.0 
will be reserved for flood storage. Estimated cost for 
1987 is $123,490,000 of which $62,540,000 is Federal 
and $60,950,000 non-Federal. (See Table 10-B for 
authorizing legislation.) 
Local cooperation. Local interests will be required to 
reimburse the United States for all costs allocated to 
water supply in accordance with the Water Supply Act 
of 1958, as amended; and one-half of the separable first 
cost of the project allocated to general recreation and 
fish and wildlife enhancement. In addition, local interests 
are required to reimburse the United States for the 
annual operation, maintenance and replacement cost 
allocated to water supply, and bear all cost of operation, 
maintenance and replacement of recreation and fish and 
wildlife areas and facilities for initial development. 
Operations and results during fiscal year. New work: 
Engineering and design costs total $18,833. 
Condition at end of fiscal year. Construction has not 
been initiated. 
30. BIG BROWN CREEK 
AND TRIBUTARY, 
PRENTISS COUNTY, MS 
Location. The project is located at the Marietta- 
Hazeldell Road bridges crossing Big Brown Creek and 
Big Brown Creek tributary located about 2.0 and 2.2 
miles, respectively, east-north-east of Marietta in 
Prentiss County, MS. 
Existing Project. The authorized project provides for 
emergency streambank protection to the banks and the 
bottoms of the channels to retard erosion at the 
described project site. The banks and bottoms will be 
graded and protected with 24 inches of riprap on six 
inches of bedding material and filter fabric. The placement 
of the riprap at the bridge crossing Big Brown 
Creek would begin 50 feet downstream from the centerline 
of the bridge and will extend upstream for 100 feet. 
The placement of the riprap at the bridge crossing Big 
Brown Creek tributary will begin 60 feet downstream 
from the centerline of the bridge and will extend 
upstream for 100 feet. 
Local cooperation. Fully complied with. 
Operation and results during fiscal year. New Work: 
Construction of project during FY 1987 cost $111,039. 
Condition at end of fiscal year. Project construction 
was initiated in FY 1986 and completed in FY 1987 at a 
total cost of $137,500. 
31. BOLIGEE CANAL, BOLIGEE, AL 
Location. Boligee, Alabama is located in southern 
Greene County about 40 miles west of Tuscaloosa, 
Alabama. Boligee Canal originates about five miles 
northeast of Boligee and flows southwesterly to a point 
north of Boligee where it turns west and flows for about 
1.5 miles before it enters a natural channel, approximately 
two miles upstream from its mouth on the 
Tombigbee River. 
Existing project. The authorized project provides for 
clearing and snagging Boligee Canal from its confluence 
with the Tombigbee River upstream to mile 5.84. Work 
will be done from within the channel and extend from 
top bank to top bank, an approximate width of 20 feet. 
(See Table 10-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New work: 
Minor costs associated with the project total $1,052. 
Condition at end of fiscal year. The project is 
essentially complete at a total cost of $163,606. 
32. CHATTAHOOCHEE RIVER, 
EUFAULA, AL 
Location. The project is located at the Alabama State 
Docks Barge Port on the Chattahoochee River in 
Eufaula, AL. 
Existing project. The authorized project provides for 
shoreline protection consisting of riprap placed on the 
slopes for 300 feet along the State Docks and a 60 linear 
foot sheet pile cutoff wall driven behind the docks 
wharf. Work will prevent further erosion and loss of fill 
material under the wharf. 
Local cooperation. Fully complied with. 
Operation and results during fiscal year. New work: 
Construction costs total $190,615. 
Condition at end of fiscal year. Construction was 
initiated in FY 1986 and essentially completed in FY 
1987 at a total cost of $204,780. 
33. GOODFOOD CREEK, 
CHICKASAW COUNTY, MS 
Location. The project is located at Goodfood Creek 
Road about 1.5 miles east of U.S. Forest Service's Davis 
Lake recreation area in the northern portion of Chickasaw 
County, MS. 
Existing project. The authorized project provides for 
bridge protection using riprap extending 30 feet up and 
downstream of the bridge. (See Table 10-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New work: 
Construction costs total $67,896. 
Condition at end of fiscal year. Project construction 
was initiated in FY 1986 and essentially completed in 
FY 1987. 
34. HIGHWAY 39 BRIDGE, 
GAINESVILLE, AL 
Location. The project is located on the Tombigbee 
River, upstream of the Highway 39 bridge in Gainesville, 
AL. 
10-14

MOBILE, ALABAMA DISTRICT 
Existing project. The authorized project provides for 
slope protection for a 2000-foot reach of the east bank 
of the Tombigbee River, immediately upstream of the 
existing Highway 39 bridge. (See Table 10-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New work: 
Construction costs total $62,867. 
Condition at end of fiscal year. Work on the project 
continued during FY 1987. Total cost of the project to 
date is $64,121 
35. HOUSTON SCHOOL ROAD BRIDGE, 
ITAWAMBA COUNTY, MS 
Location. Houston School Road Bridge crosses 
Tynes Branch, a Twenty Mile Creek tributary, and is 
located about two miles west of Houston in northwest 
Itawamba County, MS. 
Existing project. The project provides for bridge 
protection using riprap extending 62 feet downstream 
of centerline of bridge and extending upstream for 99 
feet. (See Table 10-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Operation and results during fiscal year. New work: 
Construction costs total $35,870. 
Condition at end of fiscal year. Project was initiated 
in FY 1986 and essentially completed in FY 1987. 
36. LEAF AND BOWIE RIVERS, 
HATTIESBURG, MS 
Location. The Leaf River forms the east boundary of 
the city of Hattiesburg, the county seat of Forrest 
County, located in south-central Mississippi. The river 
separated Hattiesburg from the smaller city of Petal. 
Bowie River flows southeasterly along the northern 
boundary of Hattiesburg and joins the Leaf River at the 
northeast corner of the city. 
Existing project. The project provides for channel 
snagging, overbank clearing within the flood plains, 
riprap protection of the Southern Railroad and River 
Avenue Bridge piers and removal of the Petal sewage 
lagoon. Work will also include installation of a flood 
warning system. (See Table 10-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New work: 
Project construction costs amounted to $292,108. 
Condition at end of fiscal year. The project was 
essentially completed in FY 1987. The remaining work 
consists of minor grassing and installation of the flood 
warning system. This work is scheduled to be completed 
in FY 1988. Total cost of construction as of September 
30, 1987 is $1,359,580. 
37. MARTIN CREEK, 
PRENTISS COUNTY, MS 
Location. The project is located at the Altitude Road 
bridge crossing Martin Creek about 6.7 miles eastsoutheast 
of Booneville in Prentiss County, MS. 
Existing project. The project provides for emergency 
streambank protection to the banks and the bottom of 
the channel to retard erosion at the Altitude Road 
bridge crossing Martin Creek. The banks and bottom 
will be graded and protected with 24 inches of riprap on 
6 inches of bedding material and filter fabric. Two 
hundred linear feet of barbed wire fence will have to be 
moved. Two acres of land will be required for construction 
of the project. (See Table 10-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Operation and results during fiscal year. New work: 
Project construction costs amounted to $63,691. 
Condition at end of fiscal year. The project was 
essentially completed in FY 1987 at a total cost of 
$78,335. 
38. MURDER AND BURNT CORN 
CREEKS, BREWTON, AL 
Location. The project is located in the city of 
Brewton, AL near the confluence of Murder and Burnt 
Corn Creeks in the commercial district of downtown 
Brewton. 
Previous project. A limited stream clearing and 
snagging project was completed in 1980 on portions of 
both creeks to remove obstructions to flows. This 
interim measure was undertaken to reduce flooding in 
Brewton and East Brewton. Further, an evacuation 
plan for East Brewton was implemented under the 
Section 205 authority. The project involved removal of 
damageable structures from the low-lying flood plain of 
Murder Creek. 
Existing project. The authorized non-structural project 
provides for the alleviation of flood problems at Brewton 
by the removal of 31 damageable structures from the 
10-year flood plains of Murder and Burnt Corn Creeks. 
(See Table 10-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New work: 
Real estate acquisitions during FY 1987 cost $427,607. 
Condition at end of fiscal year. Real estate purchases 
will continue through FY 1988. Total cost of project as 
of September 30, 1987 is $662,231. 
10-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
39. NOXUBEE RIVER RELIEF BRIDGE, 
SHUQUALAK, MS 
Location. The Noxubee River relief bridge is located 
on the Shuqualak-Mahorner Road near Shuqualak, 
Mississippi. The Noxubee River at this location flows 
through Noxubee County, which is located in east 
central Mississippi. The project is about 48 miles south 
of Columbus, Mississippi. 
Existing project. The project provides for streambank 
protection at Noxubee River relief bridge consisting 
of grading and protecting of banks with 24 inches of 
riprap on 6 inches of bedding material and filter fabric. 
This would preclude any erosion from high velocities or 
from sudden drawdown associated with receding floodwaters. 
(See Table 10-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Operation and results during fiscal year. New work: 
Construction costs total $87,810. 
Condition at end of fiscal year. Construction was 
initiated in FY 1986 and essentially completed in FY 
1987 at a total cost to date of $119,123. 
40. SEWERLINE PROTECTION, 
VALLEY, AL 
Location. Valley, Alabama is located on the west 
bank of the Chattahoochee River in the southeast 
corner of Chambers County. The West Point Lake and 
Dam is located approximately 11 miles up river from 
Valley and controls a drainage area of approximately 
3600 square miles. A sanitary sewage line and pumping 
station were built in 1972 to provide service from 
approximately 200 homes and several businesses 
located near Valley. This line serves as the only sewage 
transport for this area. 
Existing project. The project provides for the restoration 
of approximately 1600 linear feet of streambank. 
This will consist of placing approximately 1550 
cubic yards of No. 5 riprap on 4445 square yards of filter 
fabric. Any reshaping of the bank will be done by 
placing backfill material as opposed to cutting the 
existing streambank. The reshaped bank will then be 
grassed. (See Table 10-B for authorizing legislation.) 
Local coolperation. Fully complied with. 
Operation and results during fiscal year. New work: 
Minor costs associated with project total $2,924. 
Condition at end of fiscal year. Construction was 
initiated in FY 1985 and essentially completed in FY 
1986 at a total cost to date of $170,793. 
41. SOPE CREEK, 
MARIETTA, GA 
Location. The project is located in Marietta, Georgia 
in Cobb County which is in the north-central section of 
Georgia, just north-northwest of Atlanta. Sope Creek is 
a small tributary of the Chattahoochee River and flows 
generally from northwest to southeast from its beginning 
in the city of Marietta. 
Existing project. The project provides fors flood 
control measures along Sope Creek in Cobb County, 
Georgia. The project provides for both a structural and 
nonstructural component. The structural component 
provides for clearing and snagging of the creek. This 
would involve the clearing of all material, trees, shrubs 
and any underbrush less than 12 inches in diameter from 
a strip 30 feet wide on each side of the creek and 
removing all trees, shrubs and underbrush within the 
creek banks. Snagging would involve the removal of all 
fallen trees and debris which are in the creek. The 
nonstructural component provides for the evacuation 
of 13 structures located on the west side of the creek 
within the Fox Hill subdivision. The project provides 
for purchase and removal of the structures. (See Table 
10-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Operation and results during fiscal year. New Work: 
Project costs totaled $18,584. 
Condition at end of fiscal year. The nonstructural 
work was essentially completed in FY 1986. The 
clearing and snagging phase of the project will be 
readvertised in FY 1988. 
42. TALLABINELLA CREEK, 
CHICKASAW COUNTY, MS 
Location. The project is located along Tallabinella 
Creek at Pleasant Valley Road about 3.5 miles northwest 
of the city of Okolona in northeast Chickasaw 
County. 
Existing project. The project provides for bridge 
protection using riprap extending 30 feet up and 
downstream of the bridge. (See Table 10-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Operation and results during fiscal year. New work: 
Construction costs total $57,222. 
Condition at end of fiscal year. Project construction 
was initiated in FY 1986 and essentially completed in 
FY 1987. 
43. TOMBIGBEE RIVER (EAST FORK), 
MISS. AND ALA. 
Location. The project is located on the Tombigbee 
River and its tributaries between the junction of Browns 
and Mackeys Creek in Itawamba County, Mississippi, 
for a distance of 53 miles along the East Fork of the 
Tombigbee River, from Walkers Bridge at the junction 
of Browns and Mackeys Creeks to the Monroe County 
line, by clearing the banks of trees and underbrush to 
flood stage, the removal of drift jams and the excavation 
of 13 cutoff channels; and for additional channel 
improvements and related works for flood control of 
the Tombigbee River and tributaries above the mouth 
of and including the Noxubee River in accordance with 
plans approved by the Chief of Engineers, to protect 
people and valuable agricultural property from over- 
10-16

MOBILE, ALABAMA DISTRICT 
flow waters of the Tombigbee River. (See Table 10-B for 
authorizing legislation.) 
Local cooperation. Fully complied with on work 
done under the 1936 Flood Control Act. Work to be 
done under authority of the 1941 Flood Control Act 
requires local interest to provide all lands, easements, 
and rights-of-way for project construction; hold and 
save the United States free from damages due to construction 
of the project; and maintain and operate all 
the works after completion in accordance with regulations 
prescribed by the Secretary of the Army. 
Operations and results during fiscal year. Maintenance: 
Condition surveys cost $101,298. Routine maintenance 
of channels and canals cost $21,458. Engineering 
and design of maintenance features cost $2,490. 
Condition at end of fiscal year. The project for 
Itawamba County, as authorized in the 1936 Flood 
Control Act, was completed during fiscal year 1940. No 
work has been done on the extension of the project 
authorized in the 1941 Flood Control Act. The over-all 
project, as modified, is about 55 percent completed. 
Total Federal costs of the existing project as of September 
30, 1987 were $134,801 for new work and $2,503,340 
for maintenance, a total of $2,638,141. 
44. TOMBIGBEE RIVER 
TRIBUTARIES, MS AND AL 
Location. The Tombigbee River rises in extreme 
northeast Mississippi and flows southerly through 
eastern Mississippi and western Alabama, emptying 
into the Mobile River about 45 miles above its mouth at 
Mobile, Alabama. Tributaries to be improved for flood 
control are all in northeast Mississippi and northwest 
Alabama. 
Existing project. The authorized project provides for 
improvement of 22 tributaries of the Tombigbee River 
by means of channel clearing and snagging. Approved 
estimate of cost (1987) for new work is $50,47,000; 
consisting of $48,000,000 Federal funds, and $2,447,000 
non-Federal funds. (See Table 10-B for authorizing 
legislation.) 
Local cooperation. Local interests must furnish lands 
and rights-of-way for construction; make all roads, 
highway bridge, and utility changes, alterations, additions, 
and relocations necessary for the project; hold the 
United States free from damages; prevent future encroachments 
along the improved channels; maintain all 
works after completion, with the exception of Twenty 
Mile Creek from mile 11.7 to mile 22.0. 
Operations and results during fiscal year. New work: 
Provided riprap armor for bank stabilization and 
erosion control at Twenty Mile Creek at a total cost of 
$1,677,675. Engineering and design costs for Luxapalila 
Creek were $133,818. 
Condition at end of fiscal year. Construction commenced 
in July 1965, and is proceeding stream by 
stream as funds are made available. Federal cost of 
existing project as of September 30, 1987 was $20,034,481 
for new work. Contributed funds for new work amounted 
to $63,281. 
45. OLD HIGHWAY 82 BRIDGE, 
COLUMBUS, MS 
Location. The Old Highway 82 bridge is located at 
Columbus, Mississippi in east-central Mississippi and 
crosses the Tombigbee River at river mile 364.96. It is 
about 131 miles northeast of Jackson, Mississippi. 
Existing project. The project provides protection 
along the right descending bank. The slope protection 
would consist of 24 inches of riprap on 6 inches of 
bedding material and a filter fabric. The riprap placement 
would begin approximately 140 feet downstream 
of the centerline of the bridge and extend upstream 
along the right descending bank for 330 feet. (See Table 
10-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New Work: 
Minor miscellaneous costs total $5,532. 
Condition at end of fiscal year. Construction contract 
was awarded on 25 July 1985. Project was essentially 
completed in FY 1986. 
46. INTERSTATE 59 BRIDGES, 
FOSTERS, AL 
Location. The Interstate 59 bridges are located near 
the community of Fosters in Tuscaloosa County, Alabama 
and crosses over the Black Warrior River at 
navigation mile 320.5 The bridges are about 10 miles 
southwest of Tuscaloosa, Alabama. 
Existing project. The project provides streambank 
protective measures at the bridges. Bank stabilization 
would consist of placing riprap along a 195-foot reach 
of the left descending bank at the bridge. (See Table 
10-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Operation and results during fiscal year. New Work: 
Minor construction costs totaled $20,982. 
Condition at end of fiscal year. Construction contract 
was awarded on 13 September 1985. Project was 
essentially completed in FY 1986. 
47. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Local flood protection works for which inspection is 
performed under this heading consist of levee projects at 
West Point, Georgia, on the Chattahoochee River; 
Beaver Creek at Montezuma, Georgia, in the Flint 
River Basin; Elba and Geneva, Alabama in the Choctawhatchee 
River Basin; Rome, Georgia, and Little Wills 
Creek at Collinsville, Alabama, in the Alabama-Coosa 
10-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
River Basin. Channel rectification projects include 
Little Cove Creek, Glencoe, Alabama and Black Creek, 
Gadsden, Alabama in the Alabama-Coosa River Basin; 
Big Brown Creek, Donivan Creek, Twenty Mile Creek 
and Mantachie Creek, near Fulton, Mississippi, Burketts 
Creek and Stanifer Creek near Amory, Mississippi, 
Houlka Creek and Sakatonchee Creek in Chickasaw 
and Clay Counties, Mississippi, James Creek in Monroe 
County, Mississippi, and Luxapalila Creek, Lowndes 
County, Mississippi, all in the Tombigbee River Basin; 
Sowashee Creek, Meridian, Mississippi in the Pascagoula 
River Basin; Burnt Corn and Murder Creeks, 
Brewton, Alabama in the Conecuh River Basin; Autauga 
Creek, Prattville, Alabama; Poley Bridge, Goose Pond 
and Walnut Creeks, Clanton, Alabama; Pinchgut Creek, 
and Cahaba River, Trussville, Alabama; Town Creek, 
Americus, Georgia; and Lake Douglas in Bainbridge, 
Georgia. Shore protection arid erosion control projects 
include Harrison County, Mississippi; Leaf River, 
Mahned, Mississippi; Chattahoochee River at La 
Grange, Troup County, Georgia; Pumpkinvine Creek, 
Emerson, Georgia; and Chickasawbogue Creek, US 
Highway 43 Bridge, Linden, Alabama. The project at 
Rome and Montezuma, Georgia and Collinsville, Alabama 
include pumping stations. Inspections were made 
during FY 87 to determine the extent of compliance 
with approved regulations for maintenance and operation 
of the project. Responsible local officials were 
advised of inadequacies in the maintenance and operation 
of the local flood protection works under their 
jurisdiction where appropriate. Followup for compliance 
of the deficient projects continued during the 
year. Fiscal year costs were $67,064. Total cost to 
September 30, 1987, was $446,364 charged to maintenance. 
48. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 10-E) 
49. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood Control activities pursuant to Section 205, 
Public Law 858, 80th Congress, as amended (Pre-authorization). 
Snagging and Clearing for flood control pursuant to 
Section 208 of Flood Control Act of 1954, as amended. 
Emergency streambank and shoreline protection pursuant 
to Section 14 of the Flood Control Act of 1946, as 
amended. 
(See Table 10-J) 
Emergency flood control activities-repair, flood 
fighting, and rescue work under Public Law 99, 84th 
Congress, and antecedent legislation, and disaster relief 
and assistance under Public Law 288, 93d Congress. 
(See Table 10-J) 
Multiple-Purpose Projects Including Power 
50. ALABAMA-COOSA RIVERS, 
AL AND GA 
Location. Alabama River is formed 18 miles above 
Montgomery, Alabama, by the junction of the Coosa 
and Tallapoosa Rivers. It then flows southwesterly 
through Alabama 318 miles and unites with the Tombigbee 
River about 45 miles north of Mobile, in southwestern 
Alabama, to form the Mobile River. (See 
Geological Survey maps for central and southwest 
Alabama.) The Coosa River is formed at Rome, 
Georgia, in northwest Georgia, by the junction of the 
Oostanaula and Etowah Rivers, which have their 
sources in southeastern Tennessee and northern Georgia. 
From Rome the Coosa River flows southwesterly 
through Georgia and Alabama 286 miles and unites 
with the Tallapoosa River near Montgomery, Alabama, 
at about the center of the State, to form the Alabama 
River. (See Geological Survey maps for northeast Alabama, 
southeast Tennessee, and northwest Georgia.) 
Previous project. Projects for Alabama River: for 
details see page 1837, Annual Report for 1915; page 725, 
Annual Report for 1938; and page 592, Annual Report 
for 1944. Projects for Coosa River: for details see page 
1837, Annual Report for 1915; page 728, Annual 
Report for 1938; and page 594, Annual Report for 1944. 
Existing project. The authorized project provides for 
full development of the Alabama-Coosa Rivers and 
tributaries for navigation, flood control, power, recreation, 
and other purposes, in accordance with plans 
under preparation by Chief of Engineers, subject to 
modifications thereof which may be advisable for 
increasing development of hydroelectric power. (See 
Table 10-B for authorizing legislation.) Public Law 436, 
83rd Congress, suspended authorization of the comprehensive 
plan, insofar as it provides for development of 
hydroelectric power for Coosa River, to permit non- 
Federal interests to develop the Coosa River by construction 
of a series of dams in accordance with 
conditions of a license issued pursuant to Federal Power 
Act and in accordance with certain other provisions and 
requirements of the aforementioned public law. The 
present phase of improvement provides for construction 
of Robert F. Henry and Millers Ferry multiplepurpose 
improvements, Claiborne Lock and Dam, and 
supplemental channel work providing for a nine-foot 
deep navigation channel from the mouth of the Alabama 
River to Montgomery, Alabama, and for construction 
of Carters Dam, a multiple-purpose improvement 
on Coosawattee River, Georgia. 
Local cooperation. Requirements of local cooperation 
will be determined as formulation of plans for 
development of projects progress. No action in the 
matter of local cooperation has been initiated. 
Terminal facilities. On the east bank of the river a 
natural landing connects with city streets at Montgomery. 
Wofford Oil Company has a small wharf about 10 
miles below Montgomery equipped for handling petro- 
10-18

MOBILE, ALABAMA DISTRICT 
leum products. There are also various natural landings 
along the river. Facilities and natural landings on 
Alabama River are considered adequate for existing 
commerce. 
Operations and results during fiscal year. New work: 
Public use areas at Millers Ferry Lock and Dam cost 
$2,136. 
Maintenance: Contract maintenance dredging of the 
river system cost $2,654,574. General charges for engineering 
and design, condition surveys, supervision and 
administration and miscellaneous costs amounted to 
$1,223,027. Coosa River Reservoir operations cost 
$549,056 and lock operations $392,182. In addition, 
operation of Robert F. Henry Lock and Dam cost 
$2,040,427, Millers Ferry Lock and Dam, $2,608,238; 
Carters Lake, $2,923,539; all for a total maintenance 
cost of $12,391,043. 
Condition at end of fiscal year. Construction was 
initiated on Carters Dam in April 1962 on Millers Ferry 
Lock and Dam in April 1963, Claiborne Lock and Dam 
in May 1965, and Robert F. Henry Lock and Dam in 
March 1966. Carters Dam was essentially completed in 
FY 1980. The authorized nine-foot navigation channel 
to Montgomery, Alabama was opened to traffic in 
January 1972. Overall construction is essentially complete 
at Millers Ferry Lock and Dam. Construction of 
Robert F. Henry Lock and Dam is essentially complete. 
Total Federal costs of the existing project as of September 
30, 1987 are $425,619,426, including $305,735,490 
for new work and $119,883,936 for maintenance. (See 
Table 10-L.) 
50A. CARTERS LAKE, GA 
Location. The damsite is in Murray County, Georgia, 
on the Coosawattee River 26.8 miles above its junction 
with Conasauga River, one of the headwater tributaries 
of the Alabama-Coosa system. It is 60 miles north of 
Atlanta near the town of Carters, Georgia. The reservoir 
is in both Murray and Gilmer Counties. 
Existing project. The authorized project consists of a 
1,950-foot long rockfill dam across the river, three 
saddle dikes on the left bank, a 258-foot long high-level, 
gated spillway on the left bank, a power house on the 
right bank having two conventional units with a generating 
capacity of 125,000 kilowatts each and two pumpgenerating 
units of the same size, and a regulating dam 
2,855 feet long with a gated spillway 208 feet long 1.5 
miles downstream from the main dam. The lake has an 
area of 3,220 acres, at maximum power pool elevation 
1,072, total capacity of 472,800 acre-feet, of which 
134,900 acre-feet is usable for power and 95,700 acrefeet 
reserved for flood control and 242,200 acre-feet 
dead storage. For other information see description of 
Alabama-Coosa project. 
Operations and results during fiscal year. New Work: 
None. 
Maintenance: Operation and ordinary maintenance 
of the dam, reservoir, powerhouse, service and recreational 
activities and administration incidental thereto 
cost $2,923,539. Gross power generation amounted to 
544,719,000 kilowatt hours during FY 1987, of which 
157,935,000 were delivered to Southeastern Power 
Administration. Recreation attendance during CY 1986 
totaled 1,078,500 recreational user days. Reduced flood 
damages attributed to the Carters project and to the 
joint operation with Allatoona were $2,561,121 during 
FY 1987. 
Condition at end of fiscal year. Construction which 
commenced in April 1962 was essentially completed in 
September 1980. Total Federal costs of the existing 
project as of September 30, 1987 are $135,415,018, 
including $111,140,340 for new work and $24,274,678 
for maintenance. 
50B. CLAIBORNE LOCK AND DAM, AL 
Location.The site is in Monroe County at mile 81.8 
on the Alabama River, 15 miles northwest of Monroeville 
and 5.7 miles upstream from the U.S. Highway 84 
bridge. 
Existing project. The authorized project consists of a 
short earth dike on the right bank, a combination of a 
fixed-crest and gated spillway extending across the river 
channel and into the left bank, a navigation lock and 
mound on the left bank, and an earth dike extending 
across the left overbank to high ground. Normal upper 
pool is at elevation 35 and the minimum pool will be 
elevation 32 to provide storage for reregulation of 
Millers Ferry powerplant releases. The 60-mile long 
reservoir has an area of 5,850 acres and a volume of 
96,360 acre-feet. For other information see description 
of Alabama-Coosa projects. 
Operations and results during fiscal year. New work: 
none. Maintenance: none. Recreation attendance during 
CY 1986 totaled 784,200 user days. 
Condition at end of fiscal year. Construction began in 
May 1965 and was completed in FY 1976 at a total cost 
of $27,997,450. 
50C. ROBERT F. HENRY LOCK AND 
DAM, AL 
Location. The site is in Lowndes and Autauga 
Counties at mile 245.4 on the Alabama River, 26 miles 
west of Montgomery. 
Existing project. The authorized project provides for 
a navigation lock, a gated spillway, and a power plant 
located at mile 245.4. The normal upper pool is at 
elevation 125.0 and the minimum lower pool due to the 
Millers Ferry Lock and Dam is at elevation 80.0. The 
structures consist of earth dikes and a power plant on 
the right bank, a gated spillway in the river channel, a 
lock and mound on the left bank, and an earth dike 
extending upstream parallel to the Western Railway of 
Alabama. The total length of the structures is about 
14,962 feet with maximum height above the foundation 
10-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
at the power plant intake about 101 feet. The power 
plant contains four 17,000-kw. units. The 88-mile long 
reservoir has an area of 12,300 acres at normal pool level 
and a total capacity of 234,200 acre-feet. The lock has a 
chamber 84 feet wide and 600 feet long and provides a 
12-foot depth over the lower miter sill. For other 
information see description of Alabama-Coosa project. 
Operations and results during fiscal year. New work: 
None. 
Maintenance: Operation and maintenance costs amounted 
to $2,040,427. Gross power generation amounted 
to 288,767,000 kilowatt-hours during FY 1987, of 
which 282,189,000 were delivered to Southeastern Power 
Administration. Recreation attendance at R.E. "Bob" 
Woodruff Lake during CY 1986 totaled 2,699,800 user 
days. 
Condition at end of fiscal year. Construction began in 
March 1966 and is essentially complete. The first 
powerhouse unit was placed in operation in June 1975, 
with the last unit on line in November 1975. Total 
Federal costs of the project as of September 30, 1987 
were $102,231,619, including $83,360,800 for new work 
and $18,870,819 for maintenance. 
50D. MILLERS FERRY LOCK AND 
DAM, AL 
Location. The site is in Wilcox County at mile 142.2 
on the Alabama River, 10 miles northwest of Camden, 
Alabama, and 30 miles southwest of Selma. 
Existing project. The project consists of an earth dike 
on the right bank, a concrete, gravity-gated spillway in 
the river channel, a lock and mound on the left bank, an 
earth dike extending downstream paralleling the lock, 
to the powerhouse intake structure; a powerhouse, and 
anearth dike extending to high ground on the left bank. 
Normal upper pool is at elevation 80. The powerplant 
contains three 25,000 kilowatt units. The 103-mile long 
reservoir has an area of 17,200 acres at normal pool level 
and a total capacity of 331,800 acre-feet. The lock 
chamber is 84 by 600 feet with a 13-foot depth over the 
miter sills. For other information see description of 
Alabama-Coosa' project. 
Operations and results during fiscal year. Minor costs 
spent for public use facilities total $2,136. 
Maintenance: Operation and maintenance of lock, 
dam, powerhouse, reservoir, and administration incidental 
thereto cost $2,608,238. Gross power generation 
amounted to 330,334,000 kilowatt-hours during FY 
1987, of which 324,605,000 kilowatt-hours were delivered 
to Southeastern Power Administration. Recreation 
attendance at William "Bill" Dannelly Reservoir 
duriig CY 1986 totaled 2,399,600 user days. 
Condition at end of fiscal year. Construction began in 
April 1963. The lock was placed in temporary operation 
in June 1968 and opened to full use in November 1969. 
The powerhouse units were placed on line during April 
and May 1970. The project was essentially completed in 
1980. Total Federal costs of the project as of September 
30, 1987 were $63,124,643 for new work and $31,435,039 
for maintenance, a total of $94,559,682. 
50E. COOSA RIVER NAVIGATION 
Location. The Coosa River is one of the two major 
tributaries forming the Alabama River approximately 
18 miles northeast of Montgomery, Alabama. From its 
source at the juncture of the Etowah and Oostanaula 
Rivers in northwest Georgia, it flows southwesterly 
about 286 miles to join with the Tallapoosa River in 
forming the Alabama River. 
Existing project. The improvement of the Alabama- 
Coosa River for navigation to Rome, Georgia was 
authorized by Congress in the River and Harbor Act of 
1945. A report in House Document 320, transmitted to 
Congress on 27 January 1960, recommended that the 
navigation project for the Coosa River from Montgomery 
to Gadsden be accomplished after the waterway to 
Montgomery was assured. The plan of improvement 
identified in House Document 320 provided for a 
waterway 9 feet deep with widths of 200 feet to 
Montgomery, Alabama, and 150 feet to Rome, Georgia. 
The water-way to Montgomery has essentially been 
completed. The estimated 1987 cost for the waterway 
from Montgomery to Gadsden is $1,406,600,000 of 
which $1,349,400,000 is Federal and $57,200,000 non- 
Federal. Funding was initiated in FY 1978 for preconstruction 
planning. 
Operations and results during fiscal year. None. 
51. ALLATOONA LAKE, COOSA 
RIVER BASIN, GA 
Location. The project is on Etowah River in Bartow 
County, Georgia, about 48 miles upstream from Rome, 
Georgia, about five miles due east of Cartersville, 
Georgia, and about 2,000 feet downstream from mouth 
of Allatoona Creek. The reservoir extends about 28 
miles up the Etowah River at maximum power-pool 
elevation of 840 feet above mean sea level. 
Existing project. The authorized project provides for 
a dam and reservoir for flood control, regulation of 
streamflow for navigation, and development of hydroelectric 
power. Height above the river bottom of the 
concrete, gravity-type dam is about 190 feet, from 
elevation 690 feet to 880 feet national geodetic datum. 
The spillway, with crest at elevation 835, is controlled by 
nine tainter gates, 40 feet wide by twenty-six feet high, 
and two tainter gates, 20 feet wide by twenty-six feet 
high; having a combined discharge capacity of 321,000 
cubic feet per second with the water surface at elevation 
870.3. One 48-inch diameter sluicing conduit with a free 
discharge valve and four sluices, 5 feet-8 inches wide by 
10 feet high, are included in dam. Installed generating 
capacity consists of two 36,000 kilowatt units and one 
2,000 kilowatt unit, or a total of 74,000 kilowatts. 
Ultimate installed capacity will be 110,000 kilowatts. 
The reservoir, covering 19,200 acres at elevation 860, 
10-20

MOBILE, ALABAMA DISTRICT 
has a storage capacity of 670,000 acre-feet. The initial 
construction cost was $31,424,738, excluding the addition 
of recreation facilities at the completed project. 
(See Table 10-B for authorizing legislation.) 
Local cooperation. None required (Sec. 2, Flood 
Control Act of June 28, 1938, applies). 
Operations and results during fiscal year. New work: 
None. 
Maintenance: Operation and ordinary maintenance 
of the dam, reservoir, powerhouse, service and recreational 
activities, and administration incidental thereto 
cost $5,327,800. Gross power generation at Allatoona 
Reservoir amounted to 108,640,500 kilowatt-hours during 
FY 1987 of which 106,423,000 kilowatt-hours were 
delivered to Southeastern Power Administration. Recreational 
attendance at Allatoona Lake during CY 1986 
totaled 9,458,500 recreational user days. 
Condition at end of fiscal year. Construction of the 
existing project began in March 1944 and was completed 
in October 1955. Total Federal costs under existing 
project as of September 30, 1987 were $35,709,084 for 
new work and $5,327,800 for maintenance, a total of 
$41,036,884. 
52. APALACHICOLA, 
CHATTAHOOCHEE, AND FLINT 
RIVERS, AL, GA, AND FL 
Location. The Apalachicola River is formed at the 
southwest corner of the State of Georgia by the junction 
of the Chattahoochee and Flint Rivers and flows south 
108 miles emptying into Apalachicola Bay. Florida 
River enters the Apalachicola River from the east at 
mile 45.4 and the River Styx also enters from the east at 
mile 36.7 and Chipola River enters from the west at mile 
28.2. (See Coast and Geodetic Survey Chart 11401.) The 
Chattahoochee River, 418 miles long, rises in northeast 
Georgia and flows southwesterly to West Point, and 
thence southerly to join the Flint River at the southwest 
corner of Georgia, forming the Apalachicola River. 
(See Geological Survey maps for northwest Georgia.) 
The Flint River, 330 miles long, rises in west central 
Georgia, flows generally southeasterly to Albany, and 
thence southwest to the southwest corner of the State, 
where it joins the Chattahoochee River to form the 
Apalachicola River. (See Geological Survey maps for 
southwest Georgia.) 
Previous project. For details see page 484 of Annual 
Report for 1963. 
Existing project. The authorized project provides for 
development of the Apalachicola, Chattahoochee, and 
Flint Rivers for navigation, flood control, hydropower, 
and recreation. Navigation features of the existing 
project consist of a continuous 9-foot by 100-foot 
channel in the Apalachicola River from the intersection 
of the Gulf Intracoastal Waterway to the confluence of the 
Chattahoochee and Flint Rivers, 104 miles, thence to 
Columbus, Georgia, on the Chattahoochee River, 164 
miles, and to Bainbridge, Georgia, on the Flint River, 29 
miles, and a 3-foot by 100-foot channel on the Flint 
River from Bainbridge to Albany, Georgia, 74 miles, 
thence a channel suitable for light draft vessels at 
moderate stage to Montezuma, Georgia, 79 miles, to be 
accomplished by dredging, contraction works, and 
construction of three locks and dams (Jim Woodruff, 
George W. Andrews, and Walter F. George) along the 
9-foot depth channel, two multipurpose dams (West 
Point and Buford) on the Chattahoochee River. Three 
multipurpose dams (Lower Auchumpkee Creek, Lazer 
Creek, and Spewrell Bluff) on the Flint River were 
deauthorized in the Water Resources Development Act 
of 1986. The project also provides for minor improvements 
of certain streams tributary to the Apalachicola 
River, including a 9-foot by 100-foot side channel, 
approximately 2,000 feet long, from Apalachicola River 
to Apalachicola River Industrial Park at Blountstown, 
Fla. Plane side of reference is mean low water. Hydropower 
and flood control storage is provided at Sidney 
Lanier, Walter F. George, and West Point, and hydropower 
is provided at Jim Woodruff. For further details 
see Annual Report for 1962. (See Table 10-B for 
authorizing legislation.) 
Mean range of tide at the mouth of Apalachicola 
River is 1.6 feet. At the point where the river is formed 
the variation between low and high water is about 37 
feet. On the Chattahoochee River, variation between 
average low and high water is about 20 feet, and extreme 
fluctuation is 65.3 feet at Eufaula. On the Flint River the 
extreme fluctuation of stage due to flood is 40 feet, while 
average variation between low and high water is about 
21.5 feet. 
Local cooperation. Fully complied with to date. 
Terminal facilities. About 200 feet of public docks, in 
addition to private wharves, are available at Apalachicola, 
Florida. There are numerous constructed and 
natural landings along the entire system for launching 
small craft. For details of other terminal facilities, which 
are considered adequate for existing commerce, see 
individual project descriptions. See also Table 10-M on 
locks and dams and multiple-purpose development 
included in existing project. 
Operations and results during fiscal year. New work: 
Miscellaneous costs include $9,149 at West Point Dam; 
$2,041 at Buford Dam and $4,240 at Walter F. George. 
Maintenance: The contractor's dredge removed 
628,200 cubic yards (net) of material from the river 
system at a cost of $2,696,082. Other costs incidental to 
the overall project amounted to $2,205,698. Operation 
of George W. Andrews Lock and Dam cost $297,150. 
Operations and maintenance locks and dams: Buford 
Dam cost $9,107,400; Jim Woodruff Lock and Dam, 
$5,630,585; Walter F. George Lock and Dam, 
$6,823,873; and West Point Lake, $6,372,604. Total FY 
1987 cost for entire project was $33,144,582, of which 
$11,190 was for new work, and $33,133,392 waS for 
operation and maintenance. Detailed information on 
operations and costs applicable to the individual dam 
10-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
projects is presented under their respective project titles 
elsewhere in this report. 
Condition at end of fiscal year. Improvement of 
Apalachicola River channel by dredging to provide 
project dimensions throughout is complete. All major 
construction on Lake Sidney Lanier Dam, George W. 
Andrews Lock and Dam, Jim Woodruff Lock and 
Dam, and Walter F. George Lock and Dam, is complete. 
West Point is essentially complete with the 
exception of adding recreation facilities. Channel rectification 
in Apalachicola River was completed December 
1970. More detailed information concerning condition 
at the end of fiscal year for individual locks and 
dams and multiple-purpose developments comprising 
the system is presented under their respective project 
titles elsewhere in this report. Work remaining to 
complete the project consists of completion of recreational 
facihlities at Lake Sidney Lanier, George W. 
Andrews Lock and Dam, Jim Woodruff Lock and 
Dam, Walter F. George Lock and Dam and West Point 
Dam. (See Tables 10-A and 10-M for fiscal year costs 
and summaries of overall project.) 
52A. BUFORD DAM, GA 
Location. Buford Dam is on the Chattahoochee 
River about 348.9 miles above its mouth, 50 miles above 
Atlanta and five miles northwest of Buford, Georgia. 
The reservoir, Lake Sidney Lanier, extends about 47 
miles upstream along the Chattahoochee River, and 
about 21 miles up the Chestatee River, which enters the 
Chattahoochee River 14.5 miles above the dam. 
Existing project. The authorized project provides for 
a rolled-earth dam 1,630 feet long with crest at elevation 
1,106 feet national geodetic datum, or about 192 feet 
above streambed elevation; three earth saddle dikes 
with a total length of 5,406 feet; a chute spillway with 
crest at elevation 1,085; a powerhouse in a deep cut with 
steel penstocks in tunnels, and concrete intake structure 
at the upstream end of the tunnels; and a flood control 
sluice tunnel paralleling the power tunnels. The Lake 
Sidney Lanier reservoir has a gross capacity of 
2,554,000 acre-feet of which 637,000 acre-feet of storage 
is reserved for flood control storage. The power installations 
consist of one generating unit of 6,000 
kilowatts and two units of 40,000 kilowatts each, or a 
total of 86,000 kilowatts. (See Table 10-B for authorizing 
legislation.) 
Local cooperation. None required. 
Operations and results during fiscal year. New work: 
Miscellaneous costs total $2,041. 
Maintenance: Operation and maintenance cost 
$9,107,400. Gross power generation amounted to 
122,761,000 kilowatt-hours during FY 1987, of which 
119,910,000 were delivered to Southeastern Power 
Administration. Recreational attendance at Lake Sidney 
Lanier during CY 1986 totaled 16,604,300 recreational 
user days. Flood control benefits attributed to the 
project for FY 1987 amounted to $64,562. 
Condition at end of fiscal year. Construction commenced 
in March 1950 and was completed in June 1960. 
The reservoir was in useful operation for flood control 
in February 1956. The first power generating unit was 
placed on the line June 19, 1957; the second on July 26, 
1957; and the third on October 10, 1957. 
52B. GEORGE W. ANDREWS LOCK AND 
DAM, AL AND GA 
Location. The project is on the Chattahoochee River 
about 46.5 miles above its mouth and about one mile 
below the town of Columbia, Alabama, near the head of 
Jim Woodruff Reservoir. (See Geological Survey maps 
for southeast Alabama). The pool extends up the 
navigation channel about 28 miles upstream to Walter 
F. George Lock and Dam. 
Existing project. This single-purpose project provides 
for a concrete fixed-crest spillway 340 feet long extending 
into the right bank with a crest at elevation 102 feet 
national geodetic datum, a concrete gate spillway 
adjacent to the lock 280 feet long with crest at elevation 
82 feet national geodetic datum, a single-lift lock with 
usable chamber dimensions of 82 feet by 450 feet, and a 
maximum lift of 25 feet. Depths are 13 feet over the 
lower sill and 19 feet over the upper sill at normal pool 
elevation. The underlying foundation is limestone. The 
project provides for maintenance and care. The House 
Committee on Public Works, by resolution adopted 
May 19, 1953, approved the plan as proposed by the 
Chief of Engineers for a high dam at Walter F. George 
site and a low dam at the Fort Benning site and a high 
dam at the upper Columbia site, construction of which 
was authorized by the 1946 River and Harbor Act as the 
initiation and partial accomplishment of the plan for 
full development of the Apalachicola, Chattahoochee, 
and Flint River system. (See Table 10-B for authorizing 
legislation.) 
Local cooperation. Local interests must operate all 
movable span bridges, provide suitable public terminals, 
and hold the United States free from damages. 
These conditions are being complied with. 
Terminal facilities. At Columbia, Alabama, there is a 
public wharf with concrete deck for handling general 
cargo and a bulk petroleum terminal with an unloading 
dock. Facilities are considered adequate for existing 
commerce. 
Operations and results during fiscal year. Recreational 
attendance at George W. Andrews Lock and 
Dam during CY 1986 totaled 458,200 recreational user 
days. Maintenance: Operation and maintenance cost 
included under overall Apalachicola, Chattahoochee 
and Flint project. 
Condition at end of fiscal year. Construction of the 
lock and dam began in March 1959 and was completed 
in November 1963. 
52C. JIM WOODRUFF LOCK AND DAM, 
GA AND FL 
Location. The project is located on the Apalachicola 
10-22

MOBILE, ALABAMA DISTRICT 
River 107.6 miles above its mouth, about 1,000 feet 
below confluence of the Chattahoochee and Flint 
Rivers, and 1.5 miles northwest of Chattahoochee, Florida. 
Reservoir extends about 46.5 miles upstream along the 
Chattahoochee River to the vicinity of Columbia, 
Alabama, and about 47 miles upstream along Flint 
River, or 17 miles above Bainbridge, Georgia. (See 
Geological Survey maps for southwest Georgia.) 
Existing project. The authorized project provides for 
a concrete open-crest spillway 1,634 feet long on the 
right bank, with a crest at elevation 79 feet national 
geodetic datum; a single-lift lock with usable chamber 
dimensions of 82 by 450 feet, a maximum lift of 33 feet, 
and depth over the sills of 14 feet; a gated spillway 766 
feet long with the bridge at elevation 107 feet national 
geodetic datum, or about 67 feet above the streambed 
elevation; a powerhouse with an intake section constituting 
a portion of the dam; an earth section 506 feet 
long to accommodate the switchyard and substation; 
and an overflow dike section 2,130 feet long on the left 
bank, with a crest at elevation 85. The underlying 
foundation is limestone. At the normal pool elevation of 
77, the reservoir has a total capacity of 406,160 acrefeet. 
The power installation consists of three units of 
10,000 kilowatts each, or a total of 30,000 kilowatts. 
(See Table 10-B for authorizing legislation.) 
Local cooperation. Required cooperation is being 
fulfilled. Easements for rights-of-way and spoildisposal 
areas were provided as required along the 
Apalachicola River. Adequate public terminals were 
constructed by local interests at Bainbridge, Georgia, 
on the Flint River; and at Columbia, Alabama, on the 
Chattahoochee River. Facilities are being planned for 
other localities on the project. 
Terminal facilities. A public wharf with concrete deck 
for handling general cargo, a bulk storage terminal for 
petroleum, a grain elevator, and private riverside facilities 
at Bainbridge, Georgia, on the Flint River, are 
considered adequate for existing commerce. 
Operations and results during fiscal year. New work: 
None. 
Maintenance: Operation and maintenance cost 
$5,630,585. Gross power generation amounted to 
191,164,000 kilowatt-hours during FY 1987, of which 
187,482,000 were delivered to Southeastern 
Power Administration. Recreational attendance at 
Lake Seminole during CY 1986 totaled 4,189,600 
recreational user days. 
Condition at end of fiscal year. Construction of the 
lock was commenced in 1947, and completed in 1957. 
The lock was opened to navigation in May 1954, and the 
pool was raised to project level in January 1957. The 
first power-generating unit was placed on-the-line on 
February 1, the second on March 1, and the third on 
April 26, 1957. 
52D. WALTER F. GEORGE LOCK AND 
DAM, AL. AND GA. 
Location. The project is on the Chattahoochee River 
about 75.2 miles above its mouth and about 1.5 miles 
above Fort Gaines, Georgia. (See Geological Survey 
maps for southwest Georgia.) 
Existing project. The authorized project provides for 
a concrete dam, gated spillway, and single-lift lock, with 
earth embankments at either side. The non-overflow 
section of the dam includes a powerhouse and an intake 
structure. The gated spillway is 708 feet long with a fixed 
crest at elevation 163 feet national geodetic datum. The 
two earth embankments, of almost equal lengths, have a 
total length of 12,128 feet, with a crest elevation at 215, 
and a maximum height of about 68 feet. The nonoverflow 
section of the concrete dam is 200 feet long, 
with the deck of the powerhouse section at elevation 
208. The lock, with usable chamber dimensions of 82 
feet by 450 feet, has a lift of 88 feet with the normal 
upper pool elevation at 190. Depths are 13 feet over the 
lower sill and 18 feet over the upper sill at normal pool 
elevation. The underlying foundation is limestone. 
Total reservoir capacity is 934,400 acre-feet, with 244,400 
acre-feet reserved for power. The power installation 
consists of four units of 32,500 kilowatts each, or a total 
of 130,000 kilowatts. The project provides for maintenance, 
including operation and care. The approved 
(1987) estimate for rehabilitation work to control 
seepage is $14,500,000. (See Table 10-B for authorizing 
legislation.) 
Local cooperation. Local interests must maintain and 
operate all utility and highway facilities which may be 
relocated or otherwise altered as part of the improvement, 
provide suitable public terminal facilities, and 
hold the United States free from damages. Local 
agencies and other organizations have indicated their 
willingness and ability to comply. 
Terminal facilities. Public wharves at Eufaula and 
Phenix City, Alabama, and Columbus, Georgia, are 
considered adequate for existing commerce. 
Operations and results during fiscal year. New work: 
Miscellaneous costs total $4,240. Maintenance of the 
project for operation and care was $6,823,873. Gross 
power generation amounted to 430,839,000 kilowatthours 
during FY 1987, of which 424,424,000 were 
delivered to Southeastern Power Administration. 
Recreational attendance during CY 1986 totaled 
7,740,300 recreational user days. 
Condition at end of fiscal year. Construction was 
completed in 1963. The lock was opened to navigation 
in June 1963. The first power generating unit was placed 
on-the-line in March, the second in May, the third in 
September, and the fourth in November 1963. 
52E. WEST POINT LAKE, 
CHATTAHOOCHEE RIVER BASIN, 
GA AND AL 
Location. The damsite is on the Chattahoochee River 
2.8 miles upstream from West Point, Georgia, 201.4 
miles above the mouth of the Chattahoochee River, and 
10-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
309.2 miles above the mouth of the Apalachicola River. 
At the full power pool elevation of 635 feet above 
national geodetic datum, the reservoir would lie in 
Troup and Heard Counties, Georgia, and in Chambers 
and Randolph Counties, Alabama (See Geological 
Survey maps of Georgia and Alabama.) 
Existing project. The authorized project provides for 
flood control, power, recreation, fish and wildlife 
development, and streamflow regulation for downstream 
navigation. The project provides for a gravitytype 
concrete dam 896 feet long with earth embankments 
at either end 1,111 feet long on the east end and 
5,243 feet long on the west end. The total length of the 
dam and spillway is 7,250 feet. The main dam consists of 
a concrete non-overflow section, 185 feet long on the 
west side and an earth embankmeht retaining wall on 
the east side; a gravity concrete spillway 390 feet long, 
including piers and abutments, with six tainter gates, 
each 50 feet by 41 feet. A monolith intake-powerhouse 
section and erection bay 321 feet long is constructed 
directly west and adjacent to the spillway. At the full 
power-pool elevation of 635 the reservoir provides a 
total storage of 605,000 acre-feet of which 307,000 acrefeet 
is usable. During the critical flood season the 
reservoir is operated with maximum power pool elevation 
at 625 feet to provide flood storage between 
elevations 625 and 635. The initial power installation of 
73,375 kilowatts consisting of units 1, 2 and 3 were 
placed on operation in March and April, 1975. The 
ultimate installation is 108,375 kilowatts. (See Table 
10-B for authorizing legislation.) 
Local cooperation. None required. 
Operations and results during fiscal year. New work: 
Miscellaneous costs totaled $9,149. 
Maintenance: Operation and care of the project cost 
$6,372,604. Gross power generation amounted to 
170,424,000 kilowatt-hours during FY 1987, of which 
165,791,000 were delivered to Southeastern Power 
Administration. Recreational attendance during CY 
1986 totaled 6,977,900 recreational user days. 
Condition at end of fiscal year. Construction of the 
project, which was initiated in June 1966, was essentially 
complete at the end of FY 1984. 
53. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Mobile District monitors flood control operations of 
Alabama Power Company's Weiss, H. Neely Henry, 
and Logan Martin Dams on Coosa River, Alabama, 
and their Lewis Smith Dam on Sipsey Fork (headwaters 
of Black Warrior River, Alabama), for compliance with 
regulation plans prepared in accordance with Public 
Law 436, 83rd Congress, and Federal Power Commission 
licenses. Fiscal year cost for these activities on the 
Weiss, H. Neely Henry, and Logan Martin Dams are 
included under operation and maintenance costs for the 
Alabama-Coosa Rivers. Fiscal year cost for the Lewis 
Smith Dam is included under the overall operation and 
maintenance costs for the Black Warrior-Tombigbee 
Rivers System.
General Investigations 
54. SURVEYS 
Fiscal year cost was $1,874,114 of which $576,624 was 
for navigation studies; $1,082,228 for flood damage 
prevention studies; $121,066 for special studies; $20 for 
review of authorized projects; $31,779 for special 
investigations; $5,647 for coordination with the Federal 
Energy Regulatory Commission; $24,796 for 
coordination with other agencies and non-Federal 
interests; $31,953 for a supplemental preauthorization 
study at Dalton, GA. Continuation of planning and 
engineering included $7,163 for Mobile Harbor; 
$27,687 for Oliver Lock and Dam; $1,633 for Panama 
City Beaches; $6,635 for Sowashee Creek; $12,371 for 
Three Mile Creek; $589 for Village Creek; for a total of 
$56,078. 
Advance engineering and design includes $87,999 for 
Gulfport Harbor; $48,956 for Pascagoula Harbor; 
$134,489 for Fort Toulouse; and $117,881 for 
Moundville for a total of $389,325. 
Contributed funds required for an authorized 
Federal project included $85,131 for Bayou La Batre, 
AL and $35,293 for Mississippi Gulf Coast for a total of 
$120,424. 
55. COLLECTION AND STUDY OF 
BASIC DATA 
Collection and study of basic data continued during 
the fiscal year with the initiation of Flood Insurance 
studies, the cost of which was reimbursable by FEMA. 
In addition, Flood Plain Management services were 
performed at a cost of $207,289. (See Table 10-P for 
listings of studies completed during FY 1987.) For 
listing of previous reports see page 10-50 Annual Report 
for 1974, page 10-44 of FY 1975 Annual Report, page 
10-48 of FY 1978 Annual Report, page 10-43 of FY 1983 
Annual Report, and page 10-49 of FY 1986 Annual 
Report. 
Costs incurred for environmental data studies total 
$8,105. 
Minor costs associated with the National Program 
for inspection of non-Federal dams total $6. 
10-24

MOBILE, ALABAMA DISTRICT 
TABLE 10-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
1. Apalachicola Bay New Work: 
FL Approp. 
Cost 
Maint: 
Approp. 
Cost 
2. Aquatic Plant New Work: 
Control Approp. 
(Regular Funds) Cost 
(Contributed Funds) Maint: 
Contrib. 
Cost 
3. Bayou Coden, AL New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
(Contributed Funds) New Work: 
Contrib. 
Cost 
(Contributed Funds) Maint: 
Contrib. 
Cost 
4. Bayou La Batre, AL New Work: 
(Regular Funds) Approp. 
Cost 
Maint: 
Approp. 
Cost 
(Contributed Funds) New Work: 
Contrib. 
Cost 
5. Biloxi Harbor, MS New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
(Contributed Funds) New Work: 
Contrib. 
Cost 
(Contributed Funds) Maint: 
Contrib. 
Cost 
6. Biloxi Harbor, New Work: 
East Harrison Approp. 
County Canal, MS Cost 
7. Black Warrior & New Work: 
Tombigbee Rivers, Approp. 
AL Cost 
Maint: 
Approp. 
Cost 
Major Rehab 
Approp. 
Cost 
8. Bon Secour River, New Work: 
AL Approp. 
Cost 
Maint: 
Approp. 
Cost 
10,000 
16,632 
85,000 
77,296 
60,000 
41,082 
25,000 
22,778 
24,000 
22,460 
165,000 
151,489 
683,000 
689,170 
27,000 
36,475 
322,000 
325,982 
326,000 
326,248 
2,001,000 
2,014,130 
455,000 
455,263 
5,000 
41,048 
75,000 
96,785
- 
220,000 
224,570 
501,000 
514,885 
14,354 
3,605,000 
153,586 
15,962,000 
16,904,377 
19 
20,000 
22,452 
23,000 
26,531 
- 2,033,4611 
- 2,033,4611 
55,000 3,642,8072 
55,015 3,640,3942 
93,000 642,687 
37,674 565,837 
- 21,225 
- 21,225 
- 330,7013 
- 330,7013 
16,000 747,533 
16,251 746,642 
- 100,000 
- 100,000 
- 50,000 
- 50,000 
- 311,095 
- 311,095 
50,000 3,066,852 
50,674 3,065,996 
- 10,5004 
- 10,5004 
- 1,215,4365 
- 1,215,436 s 
510,000 8,200,1066 
510,101 8,199,2786 
- 102,600 
- 102,600 
72,104 238,640 
72,105 238,640 
-25,800 216,48333 
723 216,48333 
15,222,000 128,100,9427 
12,918,680 123,445,4357 
14,942,300 193,142,9768 
14,993,606 193,000,2128 
- 48,065,300 
- 47,258,651 
- 118,615 
- 118,615 
72,000 270,478 
71,942 269,511 
10-25 
- 166,536 
- 166,535 
61,300 140,000 
35,225 145,490 
35,000 2,850,000 
1,797,450 2,102,535 
14,087,000 8,424,000 
13,553,608 9,317,927 
- -62,000 
895 482

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 10-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
(Contributed Funds) New Work: 
Approp: 
Cost 
9. Dauphin Island, New Work: 
Bay, AL Approp. 
Cost 
- 9,700 
- 9,700 
- 292,864 
- 292,864 
10. Dog and Fowl 
Rivers, AL 
(Regular Funds) 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
(Contributed Funds) New Work: 
Contrib. 
Cost 
11. East Pass Channel New Work: 
From Gulf of Approp. 
Mexico into Chocta- Cost 
whatchee Bay, FL 
96,000 
93,672 
36,000 
39,417 
163,000 
165,309 
- 217,000 
- 124,622 
2,037 
191,000 
187,526 
2,200 
922,000 
925,433 
81,150 
55,893 
80,000 
79,698 
-20,000 
60,784 
91,000 
90,207 
25,257
- 916,715 
- 916,715 
12. 
13. 
(Regular Funds) Maint: 
Approp. 
Cost 
(Contributed Funds) New Work: 
Approp. 
Cost 
Fly Creek, AL New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Gulf Intracoastal New Work: 
Waterway between Approp. 
Apalachee Bay, FL Cost 
and Mexican Border 
Maint: 
Approp. 
Cost 
14. Gulfport Harbor, New Work: 
MS Approp. 
Cost 
Maint: 
Approp. 
Cost 
15. Mobile Harbor, AL New Work: 
Approp. 
Cost 
(Contributed Funds) New Work: 
Approp. 
Cost 
Regular Funds) Maint: 
Approp. 
Cost 
(Contributed Funds) Maint: 
Approp. 
Cost 
16. Panama City New Work: 
Harbor, FL Approp. 
Cost 
626,000 
610,614 
109,000 
106,550 
3,009,000 
4,536,371 
2,293,300 
3,281,516 
31,404 
485,000 
717,401 
2,908,700 
5,172,873 
695,000 
627,559 
15,00 
2,83 
5,141,00 
5,175,52 
2,285,00 
2,363,21 
15,00 
19,44 
4,805,00 
4,819,69 
805,00 
834,70 
588,000 
768,130 
1,000 
15,356 
3,502,000 
3,515,992 
0
)5S 
0
:5 
0 -112,000 
0 -70,000 
0 130,000 
8 89,275 
- 2,685,000 
- 1,968,039 
0 8,646,000 
'6 8,796,672 
0 - 
6 - 
425,500 7,394,660 
337,172 7,306,127 
- 398,000 
- 398,000 
- 29,000 
- 29,000 
80,000 403,621 
79,255 402,617 
- 6,480,2999 
- 6,480,2999 
2,967,000 48,195,72210 
2,926,095 48,145,92310 
- 904,775" 
- 904,775" 
1,733,000 33,166,80812 
1,733,914 33,165,70312 
1,015,000 69,262,9373's 
444,538 68,635,297's 
1,650,000 8,667,500 
1,612,400 7,745,408 
4,889,000 87,415,18314 
4,759,579 87,228,30214 
- 817,000 
- 846,706 
- 1,638,045's15 
- 1,638,045'15 
10-26 
1,395,026 
1,393,639 
387,695 
376,101 
1,896,593 
1,894,945 
197,450 
195,250

MOBILE, ALABAMA DISTRICT 
TABLE 10-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
Maint: 
Approp. 
Cost 
(Contributed Funds) New Work: 
Contrib. 
Cost 
17. Pascagoula Harbor, New Work: 
MS Approp. 
Cost 
(Regular Funds) Maint: 
Approp. 
Cost 
(Contributed Funds) Maint: 
Contrib. 
Cost 
Pensacola Harbor, New Work: 
FL Approp. 
Cost 
Maint: 
Approp. 
Cost 
Perdido Pass New Work 
Channel, AL Approp. 
Cost 
(Regular Funds) 
(Contributed Funds) 
Maint: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
Maint: 
Contrib. 
Cost 
761,000 
761,668 
435,000 
431,355 
617,000 
620,887 
125,000 
123,729 
7,212,33416 
7,210,61116 
- 80,000 
- 80,000 
- 6,572,985'7 
- 6,572,9857 
2,066,000 
4,587,968 
300,000 
496,024 
3,127,000 
3,150,431 
770,028 
735,831 
3,154,000 
3,162,738 
75,456 
75,456 
2,653,000 
2,593,971 
305,885 
279,250 
38,794,4208 
38,727,34518 
2,117,309 
2,035,676 
- 1,469,693'9 
- 1,469,693'9 
2,032,000 
1,967,593 
68,000 
145,898 
19,000 
20,328 
114,000 6,291,23820 
114,524 6,290,79520 
- 629,860 
- 629,860 
-62,000 
743,601 
60,000 
51,595 
936,000 
944,695 
28,000 5,976,217 
27,430 5,974,854 
- 510,000 
- 510,000 
- 10,325 
- 10,325 
20. Tombighee River New Work: 
Columbus Port, MS Approp. 
Cost 
(Contributed Funds) New Work: 
Contrib. 
Cost 
21. Waterway Con- New Work: 
necting Tombigbee Approp. 
and Tennessee Rivers Cost 
AL, and MS Maint: 
Approp. 
Cost 
28. Okatibbee Lake, 
MS 
29. Tallahala Creek 
Lake, Pascagoula 
River, MS 
30. Big Brown Creek, 
Prentiss County, 
MS 
31. Boligee Canal, 
Boligee, AL 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
- 490,000 
- 452,535 
- 53,000 
- 53,000 
155,107,000 
88,011,301 
7,456,000 
7,447,345 
620,000 
86,839 
1,008,000 
1,184,145 
1,809 
-19,750,000 
43,785,515 
10,291,000 
11,170,456 
-100 
421,348 
859,000 
8 13,827 
593 
26,496,000 
24,174,109 
13,159,425 
13,171,967 
119,906 
793,000 
877,052 
3,931 
- 52,500 
- 26,461 
- 163,600 
- 162,554 
-5,060,000 
15,256,360 
18,816,000 
18,765,500 
490,000 
452,535 
53,000 
53,000 
995,218,20021 
988,498,47521 
66,498,75622 
66,064,13322 
- 9,739,528 
283 9,739,455 
1,031,800 9,319,692 
1,020,843 9,293,461 
18,833 
85,000 
111,039 
1,052 
3,945,757 
3,945,459 
137,500 
137,500 
163,600 
163,606 
10-27 
18. 
19.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 10-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project Funding 
32. Chattahoochee New Work: 
River, Eufaula, AL Approp. 
Cost 
33. Goodfood Creek, New Work: 
Chickasaw Co., MS Approp. 
Cost 
34. Hwy. 39 Bridge, New Work: 
Gainesville, AL Approp. 
Cost 
35. Houston School Rd. New Work: 
Bridge, Itawamba Approp. 
Co., MS Cost 
36. Leaf and Bowie New Work: 
Rivers, Hattiesburg, Approp. 
MS Cost 
37. Martin Creek, New Work: 
Prentiss County, Approp. 
MS Cost 
38. Murder and Burnt New Work: 
Corn Creeks, Approp. 
Brewton, AL Cost 
39. Noxubee River New Work: 
Relief Bridge, Approp. 
Shuqualak, MS Cost 
40. Sewerline Protection New Work: 
Valley, AL Approp. 
Cost 
41. Sope Creek, New Work: 
Marietta, GA Approp. 
Cost 
42. Tallabinella Creek New Work: 
Chickasaw County, Approp. 
MS Cost 
43. Tombigbee River New Work: 
(East Fork), Approp. 
MS & AL Cost 
Maint: 
Approp. 
Cost 
44. Tombigbee River New Work: 
Tributaries, Approp. 
MS and AL Cost 
45. 
46. 
50. 
(Regular Funds) 
(Contributed Funds) New Work: 
Contrib. 
Cost 
Old Hwy 82 New Work: 
Bridge, Columbus, Approp. 
MS Cost 
Interstate 59 New Work: 
Bridges, Fosters, Approp. 
AL Cost 
Alabama-Coosa New Work: 
Rivers, AL and GA Approp. 
Cost 
Maint: 
Approp. 
Cost 
Total Cost to 
FY84 FY85 FY86 FY87 Sept. 30, 1987 
27,50 
10,34 
310,00 
9,92 
312,00 
463,70 
1,400,00 
2,494,13 
14,00 
13,16 
27,50 
18,56 
100,00 
608,67 
11,741,5(0 
13,176,9(0
0
1 14,54 
- 185,0( 
- 17,3 
0 1,110,0 
1 833,31 
0 449,0( 
1 452,2 
40 2,000,0( 
6 985,3: 
)0
5 3 
135,0(30 
4 35,1 
- 160,0( 
- 15,1' 
)0 
10 84,4 
)0 11,224,0 
)4 10,795,4 
- 52,500 
- 14,165 
- 37,500 
- 22,699 
- 50,000 
- 1,254 
- 42,300 
- 20,738 
- 1,340,000 
- 1,067,472 
- 32,500 
- 14,644 
- 550,000 
- 234,624 
- 25,000 
43 6,429 
D0 - 
87 150,482 
00 -20,000 
83 314,854 
- 35,000 
- 22,900 
00 153,000 
13 164,098 
00 2,297,000 
30 3,297,214 
64 - 
00 - 
17 84,286 
00 -17,500 
79 I 19,039 
- -293,000 
76 46,180 
06 9,346,000 
82 10,018,072 
184,100 236,600 
190,615 204,780 
60,000 97,500 
67,896 90,595 
50,000 100,000 
62,867 64,121 
20,000 62,300 
35,870 56,608 
155,000 1,495,000 
292,108 1,359,580 
55,000 87,500 
63,691 78,335 
390,000 940,000 
427,607 662,231 
69,000 123,500 
87,810 119,123 
-14,000 171,000 
2,924 170,793 
-165,000 1,235,000 
18,584 1,176,742 
50,000 85,000 
57,222 80,122 
- 134,801 
- 134,801 
125,000 2,505,100 
125,246 2,503,340 
3,027,000 21,633,225 
1,811,493 20,034,481 
- 94,700 
- 63,281 
-19,000 143,500 
5,532 143,499 
12,700 155,200 
20,982 155,200 
-49,000 309,448,63023 
2,136 309,447,97323 
12,541,400 123,185,36024 
12,391,043 122,658,26624 
10-28

MOBILE, ALABAMA DISTRICT 
TABLE 10-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
50A. Carters Dam and 
Reservoir, GA 
50B. Claiborne Lock and 
Dam, AL 
50C. Robert F. Henry 
Lock and Dam, AL 
50D. Millers Ferry Lock 
and Dam, AL 
50E. Coosa River, 
Montgomery to 
Gadsden, AL 
51. Allatoona Lake, 
Coosa River Basin, 
GA 
52. Apalachicola, 
Chattahoochee, 
and Flint Rivers, 
AL and GA 
52A. Lake Sidney 
Lanier, GA 
52B. George W. Andrews 
Lock and Dam, 
AL and GA 
52C. Jim Woodruff Lock 
and Dam, GA and 
FL 
52D. Walter F. George 
Lock and Dam, 
AL and GA 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Major Rehab: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
312 
- -106,000 
- 866 
2,522,500 2,321,000 2,437,000 
2,806,966 2,361,379 2,507,840 
- 111,140,340 
- 111,140,340 
3,064,800 24,531,100 
2,923,539 24,274,678 
27,997,450 
27,997,450 
-300,000 
239,173 
1,755,000 
1,994,862 
400,000 
306,625 
12,150 
1,759,000 
1,776,575 
51,806 
-187,000 
793 
1,858,000 
1,858,604 
38,776 
3,450,000 2,499,000 2,360,000 
3,774,011 2,544,735 2,392,094 
62,560 
70,000 
169,716 
4,776,000 
5,666,044 
1,702,000 
1,959,105 
20,520 
-7,000 
65,389 
5,149,000 
4,816.217 
-1,500 
28,177 
5,745 
7,671 
5,278,000 
5,746,764 
196 
- 83,360,800 
- 83,360,800 
2,024,800 18,962,578 
2,040,427 18,870,819 
- 63,125,300 
2,136 63,124,643 
2,585,000 31,545,965 
2,608,238 31,435,039 
-49,000 14,986,400 
- 14,986,400 
- 35,709,08525 
- 35,709,08425 
5,315,800 58,405,323 
5,327,800 58,161,917 
- 339,094,09326 
11,190 339,004,53226 
22,362,000 26,743,000 27,337,000 34,565,300 309,697,66427 
24,142,063 26,228,528 28,785,527 33,133,392 307,338,91027 
6,400,000 
4,439,449 
3,000 
166,190 
5,342,000 
6,298,978
30 
30 
-1,000 
292 
3,810,000 
4,057,310 
8,483 
4,105,313 
-1,500 
10,398 
6,948,000 
6,879,884
30 
30 
3,505 
4,1 19,000 
4,154,005 
-700,000 
468,153 
-2,038 
7,152,000 
7,328,659
30 
30 
796 
4,768,000 
4,910,998 
14,274 
- 10,500,000 
4,240 10,252,003 
- 53,030,03828 
2,041 53,037,41928 
9,729,900 72,573,807 
9,107,400 71,720,228 
- 13,038,42729 
- 13,038,42729 
30 
30 
- 48,017,85831 
- 47,978,7493' 
6,451,800 56,703,881 
5,630,585 55,749,756 
- 88,295,77932 
- 88,295,78032 
10-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 10-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY84 FY85 FY86 FY87 Sept. 30, 1987 
Maint: 
Approp. 4,620,000 5,779,000 7,063,000 6,894,800 69,064,364 
Cost 4,544,659 5,947,570 7,347,633 6,823,873 68,791,996 
Major Rehab: 
Approp. 6,400,000 - -700,000 - 10,500,000 
Cost 4,439,449 4,105,313 468,153 4,240 10,252,003 
52E. West Point Lake, New Work: 
Chattahoochee River Approp. 1,700,000 10,948 - - 131,557,359 
Basin, GA and AL Cost 1,784,140 - 1,432 9,149 131,510,509 
Maint: 
Approp. 3,103,000 3,934,000 5,266,000 6,368,800 36,000,100 
Cost 3,130,304 3,958,108 5,288,528 6,372,604 35,739,067 
1. Includes $134,613 for previous projects and $28,500 for DPR 
on Two-Mile. 
2. Includes $168,766 for previous projects. 
3. Includes $5,650 for previous projects. 
4. Cost for providing spoil dikes for work authorized by 1965 
River and Harbor Act. 
5. Includes $44,382 for previous projects of which $5,000 was 
contributed funds. 
6. Includes $96,509 for previous projects of which $10,200 was 
contributed funds. 
7. Includes $606,931 for previous projects and $1,075,899 for 
recreational facilities on completed projects. 
8. Includes $50,000 for previous projects. 
9. Includes $45,605 for previous projects. 
10. Includes $65,137 for previous projects. 
11. Includes $269,017 for previous projects. 
12. Includes 2,312,297 for previous projects and $442,836 Special 
O and M funds. 
13. Includes $6,683,104 for previous projects, $14,000 Public 
Work funds, and $41,242 Emergency Relief funds. 
14. Includes $4,096,681 for previous projects and $494,136 Special 
O and M funds. 
15. Includes $203,560 for previous projects, $581,959 Public 
Works funds, $457,467 rehabilitation of jetties under existing 
project and $48,001 for Grand Lagoon modification. 
16. Includes $513,604 for previous projects. 
17. Includes $904,442 for previous projects. 
18. Includes $412,624 for previous projects, $124,565 Special O 
and M funds, and $829,472 Emergency Work Funds. 
19. Includes $594,688 for previous projects. 
20. Includes $126,649 for previous projects. 
21. Includes $1,993,000 transferred to National Park Service; 
$210,249 GI funds expended during FY 1957 thru FY 1961. Previous 
project cost amounted to $197,651. 
22. Includes $234,331 for previous projects. 
23. Includes $3,692,483 for previous projects. 
24. Includes $2,978,050 for previous projects. 
25. Includes $3,347,489 for recreational facilities. 
26. Includes $1,883,193 Federal funds, $1,924 contributed funds 
for previous projects; and $809,553 for Lazer Creek design and 
$301,310 for Rysco Channel. 
27. Includes $2,246,233 for previous projects. 
28. Includes $8,233,325 for recreational facilities. 
29. Includes $84,014 for recreational facilities. 
30. Included under maintenance for overall Apalachicola, Chattahoochee 
and Flint Rivers project. 
31. Includes $1,515,822 for recreational facilities. 
32. Includes $2,441,029 for recreational facilities. 
33. Includes $35,045 for previous project costs. 
10-30

MOBILE, ALABAMA DISTRICT 
TABLE 10-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 2, 1907 
Jan. 21, 1927 
Sept. 3, 1954 
Sept. 3, 1954 
July 3, 1958 
Nov. 21, 1963' 
Feb. 5, 1975' 
Aug. II, 1983' 
July 3, 1958 
Oct. 23, 1962 
Oct. 27, 1965 
Mar. 2, 1945 
June 2, 1969' 
Oct. 27, 1965 
APALACHICOLA BAY, FL. (See Section 1 of Text) 
Channel 18 feet deep through West Pass and Link Channels, 
10 feet deep across the inner bar, and 9 feet deep 
through Bulkhead Shoals. 
Modify project to provide for channel 10 feet deep from 
mouth of inner bar channel to Gulf via Link and West 
Pass Channels, and 10-foot depth in Bulkhead Shoals 
Channel. 
At Eastpoint, Fl., a channel 6 feet deep, 100 feet wide, 
and about 6,000 feet long, parallel to shore, with 
connecting channel 6 feet deep and 100 feet wide to St. 
George Sound, and at Apalachicola, Fl., a small-boat 
basin 200 feet and 9 feet deep, with a connecting 
channel 9 feet deep and 80 feet wide through Scipio 
Creek to the Apalachicola River. 
Modify project to provide for a channel 10 feet deep and 
100 feet wide from the 10-foot depth in Apalachicola 
Bay across St. George Island to within 300 feet of the 
Gulf shore, thence increasing uniformly in width to 200 
feet at shore and continuing at this width to the 10-foot 
depth in the Gulf, with two jetties extending from the 
dune line on St. George Island to the outer end of 
channel, and for abandonment of West Pass Channel upon 
completion of channel through St. George Island. 
Modify improvement of Apalachicola Bay, Fl., authorized 
by River and Harbor Act of Sept. 3, 1954 to provide 
that the Secretary of the Army shall reimburse local 
interests for such approved work as they may have done 
based upon the reduction in the amount of material 
which will have to be removed to provide project 
dimensions at such time as Federal dredging of the 
channels is undertaken. 
A channel 6 feet deep, 100 feet wide and about I mile long, 
parallel to shore at Two Mile, Fl., with a 6-by 100-foot 
connecting channel to water of the same depth in 
Apalachicola Bay. 
A channel 6 feet deep and 100 feet wide extending from the 
eastern end of the existing Two Mile channel and 
generally paralleling the shoreline for a distance of 
about 9,000 feet to intersect with the Gulf Intracoastal 
Waterway about 1,650 feet south of Gorrie Bridge at 
Apalachicola, and a breakwater built to elevation 4.0 
feet above mean low water along the seaward side of the 
existing channel parallel to the shore at Two Mile. The 
total length of the breakwater of about 6,150 feet, 
includes two 860-foot legs paralleling the existing 
entrance channel. 
Modify Eastpoint project to include breakwaters with a 
total length of 5,300 feet. 
AQUATIC PLANT CONTROL (See Section 2 of Text) 
Aquatic plant control for N.C., S.C., Ga., Fl., Al., Ms., 
and La. 
Research and planning costs to be borne by U.S. 
Provided for continued research. 
BAYOU CODEN, AL. (See Section 3 of Text) 
Channel 4 by 40 feet. 
Channel 8 by 60 feet to connect with Bayou La Batre 
channel. 
BAYOU LA BATRE, AL. (See Section 4 of Text) 
A 12- by 100-foot channel from that depth in Mississippi 
Sound to a point about 2,800 feet south of the highway 
H. Doc. 422, 59th Cong., 
1st Sess. 
H. Doc. 106, 69th Cong., 
Ist Sess. 
H. Doc. 156, 82d Cong., 
Ist Sess. 
H. Doc. 557, 82d Cong., 
2d Sess. 
DPR(Sec. 107) 
DPR(Sec. 107) 
DPR(Sec. 107) 
H. Doc. 37, 85th Cong., 
Ist Sess. 
Public Law 87-874 
-%7tirCong. 
H. Doc. 251, 89th Cong., 
Ist Sess. 
H. Doc. 824, 77th Cong., 
2d Sess. 
DPR (Sec. 107) 
H. Doc. 327, 88th Cong., 
2d Sess. 
10-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 10-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 3, 1930 
June 20, 1938 
Mar. 2, 1945 
Mar. 2, 1945 
May 17, 1950 
July 14, 1960 
Nov. 7, 1966 
Mar. 28, 1979' 
August 8, 1985' 
July 5, 1884 
Mar. 3, 1899 
Sept. 19, 1890 
Sept. 19, 1890 
Mar. 2, 1907 
Mar. 3, 1909 
bridge, thence a channel 12 by 75 feet to the bridge, an 
overall distance of about 33,500 feet. 
BILOXI HARBOR, MS. (See Section 5 of Text) 
Channel 10 feet deep and 150 feet wide from Mississippi 
Sound west and north of Deer Island to deep water in 
Back Bay of Biloxi. 
Relocation of channel. 
Entrance channel 6 feet deep and 50 feet wide into Old 
Fort Bayou. 
Entrance channel 8 feet deep and 100 feet wide through 
Cranes Neck into Bayou Bernard. 
Maintain channel 6 feet deep and 40 feet wide from Biloxi 
Harbor to Ott Bayou. 
Continuous channel 12 feet deep from Mississippi Sound 
the Air Force terminal on Bayou Bernard via Back Bay 
and Cranes Neck. 
A 23-mile-long through channel 12 feet deep and 150 feet 
wide from the Gulf Intracoastal Waterway through: 
Mississippi Sound, Biloxi Bay (east of Deer Island), Back 
Bay, Big Lake, and via land cut to Gulfport Lake, 
including a 500- by 2,600-foot turning basin in the lake, 
thence, a channel 12 by 100 feet from the western end of 
Gulfport Lake for about 2 miles to a 300- by 500-foot 
turning basin; adoption for maintenance of a 12- by 150- 
foot spur channel from the main channel in Biloxi Bay, 
westward about I mile to a 400- by 600-foot turning basin 
opposite Ott Bayou, and abandonment of the existing 6- by 
40-foot channel into Ott Bayou; continuation of maintenance 
of the 12- by 150-foot lateral channel westward about 2.2 
miles from the main channel in Biloxi Bay to a point 
opposite Oak Street; continuation of maintenance of the 
channel west of Deer Island. 
A channel 10 feet deep; 100 feet wide and 300 feet 
long extending northward from the Biloxi Lateral Channel, 
and, into a rectangular basin approximately 300 feet 
by 370 feet. 
BILOXI HARBOR, EAST HARRISON COUNTY CANAL, MS 
(See Section 6 of Text) 
The project provides for the improvement and 
maintenance of the East Harrison County Canal. 
BLACK WARRIOR AND TOMBIGBEE RIVERS, AL. 
(See Section 7 of Text) 
Original appropriation for improving Black Warrior River. 
Original project for slack-water improvement authorized by 
Secretary of War, Apr. 19, 1887. 
Construction of the first locks between Tuscaloosa and 
Demopolis. 
(Maintenance of the section of Tombigbee River below 
lock 1 to its mouth (66 miles) included in the existing 
project.) 
Construction of locks and dams 1, 2, and 3. Merging of 
the individual project for the Black Warrior and Warrior 
Rivers and the Tombigbee River below Demopolis. 
Construction of locks and dams 14, 15, 16, and 17. 
Provides for reconstruction of obsolete structures, modified 
in plan and location, to provide efficient and economical 
maintenance and operation. 
H. Doc. 754, 69th Cong., 
2d Sess. 
H. Doc. 639, 75th Cong., 
3d Sess. 
H. Doc. 258, 76th Cong., 
1stS ess. 
H. Doc. 326, 76th Cong., 
Ist Sess. 
H. Doc. 256, 81st Cong., 
1stS ess. 
H. Doc. 271, 86th Cong., 
2d Sess. 
H. Doc. 513, 89th Cong., 
2d Sess. 
DPR (Sec. 107) 
DPR (Sec. 107) 
Annual Report, 1887, 
pt. 2, p 1302. 
H. Doc. 178, 56th Cong., 
2d Sess., and Annual 
Report, 1901, pt. 3, 
p. 1858 
H. Doc. 165, 57th Cong., 
1st Sess., and Annual 
Report, 1902, p. 1293 
Public Law 317 
10-32

MOBILE, ALABAMA DISTRICT 
TABLE 10-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 22, 1911 
Mar. 2, 1919 
Aug. 30, 1935 
Aug. 30, 1935 
Aug. 30, 1935 
June 26, 1934 
Dec. 22, 1944 
Mar. 2, 1945 
Mar. 2, 1945 
July 14, 1960 
Dec. 21, 1982 
July 30, 1983 
Aug. 15, 1985 
Nov. 17, 1986 
May 16, 1963' 
Mar. 2, 1945 
Sept. 3, 1954 
May 19, 19691 
Lift of lock 17 changed to 63 feet, and construction of locks 
and dams 18 and 19 eliminated from the project. 
Extension of slack-water improvement to Sanders Ferry 
on Mulberry Fork and Nichols Shoal on Locust Fork. 
Raising of various dams 2 feet and raising the lock walls 2 
feet at lock 1 to provide a minimum depth of 8 feet at 
low water, widening the channel to 150 feet where 
practicable. 
For snagging Mobile River from the mouth of Chickasaw 
Creek to the junction of the Alabama and Tombigbee 
Rivers. 
Increase channel dimensions to 9 by 200 feet; construct 
crest gates at lock and dam 17; add flashboards at all 
dams; Sunflower Bend Cutoff. 
Construction of a lock and dam below Tuscaloosa to replace 
original locks and dams 10, 11, and 12 
Operation and care of locks and dams provided for with 
funds from War Department appropriations for rivers 
and harbors. 
Recreation facilities. 
Construction of a lock and dam near Demopolis to replace 
existing dams 4, 5, 6, and 7. 
Provide increased spillway capacity at dam 1. 
Coffeeville Lock and Dam Wildlife Refuge. 
Provides for a wider navigation opening at the Franklin 
Ferry Bridge, Jefferson County, Al. 
Authorized to widen, as necessary for safe passage, 
the navigation opening of Franklin Ferry Bridge, Jefferson County, Al. 
Construction and land acquisition for Oliver Lock 
Replacement 
Construction of a lock and dam to replace the 
William Bacon Oliver Lock and Dam. 
BON SECOUR RIVER, AL. (See Section 8 of Text) 
A 10- by 100-foot channel from Gulf Intracoastal 
Waterway through Bon Secour Bay to mouth of Bon Secour 
River and extending up river to vicinity of Swift's 
Landing, thence 6 by 80 feet up river to a point 
600 feet above Oak Landing, with two turning and 
maneuvering areas 150 feet wide and 1,100 to 1,200 
feet long opposite Swift'Landing and ice loading 
dock. Overall length of improvement is about 4.7 
miles. 
DAUPHIN ISLAND BAY, AL. (See Section 9 of Text) 
A channel 7 feet deep and 150 feet wide from Mobile Bay to 
an anchorage basin of same depth, about 7 acres in area, in 
marsh just north of Fort Gaines on Dauphin Island; a 
channel 4 feet deep and 40 feet wide from anchorage basin 
to Dauphin Island Bay; and a jetty and revetment to protect 
entrance channel; and (b) an anchorage basin 7 feet deep 
and 500 feet square at Dauphin Island Village, with 
an entrance channel of like depth, 100 feet wide and 
about 8,300 feet long, extending to 7-foot hydrographic 
contour in Mississippi Sound. 
DOG AND FOWL RIVERS, AL. (See Section 10 of Text) 
To provide small craft navigation on west side of Mobile Bay. 
10-33 
H. Doc. 72, 62d Cong., 
1st Sess. 
Annual Report, 1918, 
p. 876 
H. Doc. 728, 71st Cong., 
3d Sess. 
H. Doc. 56, 73d Cong., 
1st Sess., and Rivers 
and Harbors Committee 
Doc.45, 73d Cong. 
Rivers and Harbors 
Committee Doc. 26, 
74th Cong., Ist Sess. 
H. Doc. 276, 76th Cong., 
1st Sess. 
H. Doc. 382, 76th Cong., 
Ist Sess. 
S. Doc. 50, 86th Cong., 
1t Sess. 
Public Law 97-377 
Public Law 98-63 
The Energy and Water 
Development Appropriation 
Act 1985 (P.L. 99-88) 
Water Resources 
Development Act of 
1986 (P.L. 99-662) 
DPR (Sec. 107) 
H. Doc. 333, 76th Cong., 
Ist Sess. 
H. Doc. 394, 82d Cong., 
2d Sess. 
DPR (Sec. 107)

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 10-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 3, 1930 
Oct. 24, 1951 
Oct. 27, 1965 
Oct. 1, 1980 
May 17, 1950 
June 25, 1910 
Aug. 30, 1935 
June 25, 1910 
Aug. 30, 1935 
July 3, 1930 
July 3, 1930 
July 3, 1930 
July 23, 1942 
June 17, 1943 
Mar. 2, 1945 
May 17, 1950 
Nov. 7, 1966 
EAST PASS CHANNEL FROM GULF OF MEXICO INTO 
CHOCTAWHATCHEE BAY, FL. (See Section 11 of Text) 
Maintenance of 6-foot channel by 100-foot channel from 
Choctawhatchee Bay into Gulf. 
Maintenance of 12-foot channel from Choctawhatchee Bay 
into Gulf, and maintenance of 6-foot channel into Old 
Pass Lagoon. 
Construction of twin jetties. 
(Present project dimensions.) 
Modifications to provide a channel length of 
approximately 3,800 feet in lieu of 2,000 feet from 
the East Pass Channel into Old Pass Lagoon, with 
no changes in width and depth. 
FLY CREEK, FAIRHOPE, AL (See Section 12 of Text) 
A channel 6 feet deep, 80 feet wide, and about 1,650 
feet long from 6-foot depth in Mobile Bay to a turning 
basin of same depth, 100 feet wide and 350 feet long, in Fly Creek. 
GULF INTRACOASTAL WATERWAY BETWEEN 
APALACHEE BAY, FL., AND MEXICAN BORDER 
(Mobile District) (See Section 13 of Text) 
APALACHICOLA RIVER TO ST. ANDREW BAY, FL. 
A channel 5 feet deep at mean low water and 65 feet 
wide at the bottom. 
A channel 9 feet deep at mean low water and 100 feet 
wide at the bottom. 
CHOCTAWHATCHEE BAY TO WEST BAY, FL. 
A channel 9 feet deep at mean low water and 100 feet wide 
at the bottom. 
A channel 6 feet deep at mean low water, with no 
reference to width. 
CHOCTAWHATCHEE BAY TO PENSACOLA BAY, FL. 
A channel 9 feet deep at mean low water and 100 feet 
wide at the bottom. 
PENSACOLA BAY, FL., TO MOBILE BAY, AL. 
A channel 9 feet deep at mean low water and 100 feet 
wide at the bottom. 
MOBILE BAY, AL., TO NEW ORLEANS, LA. 
A channel 300 feet wide and 10 feet from the 10 
foot contour in Mobile Bay to the 10-foot contour 
in Mississippi Sound. 
A channel 100 feet wide and 9 feet deep from Lake 
Pontchartrain to Mississippi Sound. 
APALACHEE BAY, FL., TO NEW ORLEANS, LA. 
A channel 12 feet deep and 125 feet wide at mean low 
water, except in the section between Mobile, Al., 
and New Orleans, La., where the width is to be 
150 feet. 
Conditional acquisition of Gulf County Canal, Fl. 
and enlargement of the canal to 9 feet deep and 100 
feet wide. 
Construction of a movable span in the Georgia, Florida 
& Alabama R.R. bridge crossing the Ochlockonee River. 
Abandonment and closure of original channel between 
Big Lagoon and Pensacola Bay and construction of a 
new channel to enter the bay north of original 
entrance. 
Authorized enlargement of Gulf County Canal to 12 by 
125 feet. 
H. Doc. 209, 70th Congress 
1st Sess. 
H. Doc. 470, 81st Cong., 
2d Sess. 
H. Doc. 194, 88th Cong., 
2d Sess. 
Energy and Water Development 
Appropriation 
Act, 1981 (P.L. 96-367) 
H. Doc. 194, 81st Cong., 
1st Sess. 
H. Doc. 670, 61st Cong., 
2d Sess. 
Rivers and Harbors 
Committee Doc. 52, 
72d Cong., 2d Sess. 
H. Doc. 259, 72d Cong., 
1st Sess. 
H. Doc. 565, 61st Cong., 
2d Sess. 
Rivers and Harbors 
Committee Doc. 42, 
73d Cong., 2d Sess. 
H. Doc. 42, 71st Cong., 
Ist Sess. 
Rivers and Harbors 
Committee Doc. 4, 
71st Cong., 1st Sess. 
H. Doc. 341, 71st Cong., 
2d Sess. 
Public Law 675, 77th 
Cong., 2d Sess., and 
H. Doc. 96, 79th 
Cong., Ist Sess. 
H. Doc. 257, 76th Cong., 
1st Sess., and Public 
Law 75, 78th Cong. 
1st Sess. 
H. Doc. 442, 76th Cong., 
1st Sess. 
H. Doc. 325, 81st Cong., 
Ist Sess. 
Public Law 89-789, 89th 
Cong. 2d Sess. 
10-34

MOBILE, ALABAMA DISTRICT 
TABLE 10-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 3, 1899 
Mar. 2, 1907 
Feb. 27, 1911 
Jan. 21, 1927 
July 23, 1930 
June 30, 1948 
July 3, 1958 
Aug. 15, 1985 
Aug. 26, 1937 
Mar. 2, 1945 
Sept. 3, 1954 
Sept. 3, 1954 
July 26, 1970 (SR) 
Dec. 15, 1970 (HR) 
GULFPORT HARBOR, MS. (See Section 14 of Text) 
A channel 19 feet deep and 300 feet wide from the 
anchorage basin at Ship Island to Gulfport, Ms., and an 
anchorage basin next to the shore end 19 feet deep and not 
less than 2,640 feet by 1,320 feet in area. 
Combined Ship Island Pass with Gulfport Harbor project. 
Increased depth to 26 feet and width to 300 feet across 
Ship Island Bar and depth to 19 feet in channel from 
anchorage basin at Ship Island to anchorage basin at 
Gulfport. 
Authorized relocation of channel across Ship Island Bar. 
Increased depth to 27 feet and width to 300 feet across 
Ship Island Bar, 26 feet deep and 220 feet wide through 
Ms. Sound and depth of 26 feet in the anchorage basin 
at Gulfport. 
Increased depth of 32 feet and width to 30 feet across 
Ship Island Bar, 30 feet deep and 220 feet wide through 
Ms. Sound, and a depth of 30 feet in the anchorage 
basin at Gulfport. 
Maintenance of the existing commercial small-boat harbor 
and an approach channel 100 feet wide and 4,300 feet 
long, from deep water in Ms. Sound to the small-boat 
basin, all at a depth of 8 feet. 
Modify the existing Ship Channel to 36 x 300 feet 
in Mississippi Sound, and 38 x 400 feet across the 
bar, with changes in the channel alignment and 
the entrance to the anchorage basin for safe and 
unrestricted navigation. 
MOBILE HARBOR, AL. (See Section 15 of Text) 
For improvement of Threemile Creek by snagging from 
Mobile River to the Industrial Canal. 
Adoption of existing channel through Garrows Bend from 
Choctaw Point to Arlington pier, 27 feet deep and 150 
feet wide, with 2 turning basins. Adoption of the 
existing channel alongside Arlington pier from the 
Mobile Bay Channel to turning basin at the inner end 
of Garrows Bend Channel, 27 feet deep and 150 feet wide. 
A channel 25 feet deep and generally 500 feet wide in 
Mobile River from the highway bridge to the mouth of 
Chickasaw Creek, then 25 feet deep and 250 feet wide in 
Chickasaw Creek to a point about 400 feet below Shell 
Bayou. 
Enlarging Mobile Bay Channel to 42 by 600 feet, 
Enlarging Mobile Bay Channel to 40 by 400 feet. 
Deepening Mobile River Channel below highway bridge to 
40 feet over present widths, including existing 
turning basins and anchorage areas. Widening river 
channel opposite Magazine Point to provide a 40- by 800- 
by 1,400-foot turning basin. The turning basin was 
further modified for maintenance by SAD letter of 
27 November 1973 under authority contained in 
ER-1130-2-307 to increase the turning basin's 
dimensions to 1000' x 1600'. 
Closure of Garrows Bend Channel by construction and 
operation of an earth-filled causeway across said channel 
(work to be done by local interests). 
To provide a channel 40 feet deep and 400 feet wide from 
the main ship channel in Mobile Bay and extending 
northwesterly for about 5.3 miles to the shore of Mobile 
Bay including an anchorage and turning basin 
near the shoreline, thence a land-cut 40 feet deep, 300 feet 
wide and about 1.9 miles long to and including a 
trapezoidal turning basin 40 feet deep and 
H. Doc. 120, 55th Cong., 
3d Sess. 
H. Doc. 2, 60th Cong., 
Ist Sess. 
H. Doc. 692, 69th Cong., 
2d Sess. 
H. Doc. 112, 81st Cong., 
1st Sess. 
S. Doc. 123, 84th Cong., 
2d Sess. 
The Energy and Water 
Development Approp. 
Act, 1985 (P.L. 99-88) 
Rivers and Harbors 
Committee Doc. 69, 
74th Cong., 1st Sess. 
H. Doc. 739, 79th Cong., 
2d Sess. 
H. Doc. 74, 83d Cong., 
1st Sess. 
H. Doc. 74, 83d Cong., 
2d Sess. 
(Under provision of 
Section 201 of the 
1965 Flood Control 
Act) 
10-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 10-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
approximately 42 acres, 40 feet deep; a barge channel 
12- by 100-feet extending 6500-feet and terminating in a 
300-foot by 300-foot terminal basin 
Aug. 15, 1985 
Aug. 30, 1935 
Mar. 2, 1945 
June 30, 1948 
Mar. 23, 1967' 
June 14, 1972 
Mar. 4, 1913 
Mar. 4, 1915 
May 17, 1950 
Sept. 3, 1954 
July 3, 1958 
July 14, 1960 
July 14, 1967 
Oct. 23, 1962 
Deepen and widen entrance channel over the bar to 57 by 
700 feet, a distance of about 7.4 miles, deepen 
and widen Mobile Bay Channel from mouth of 
bay to south of Mobile River, 55 by 550 feet a distance 
of about 27.0 miles, deepen and widen an additional 
4.2 miles of Mobile Bay Channel to 55 by 650 feet, 
provide 55 foot deep anchorage area and turning 
basin in vicinity of Little Sand Island, and construct 
a 1710 acre disposal area adjacent to the Brookley 
Industrial Complex. 
PANAMA CITY HARBOR, FL. (See Section 16 of Text) 
Channels 27 and 29 feet deep. Abandonment of project 
adopted by act of June 25, 1910. 
Maintenance of a channel in Watson Bayou 100 feet wide 
and 10 feet deep from that depth in St. Andrew Bay to 
the highway bridge. 
Channels 32 and 34 feet deep. 
A channel 8 by 100 feet in Grand Lagoon from St. Andrew 
Bay to a point about 2,400 feet east of State Highway 
392. Bridge with branches to serve shore facilities 
which terminate at the bridge. 
Channels 38, 40, 42 feet deep. 
PASCAGOULA HARBOR, MS. (See Section 17 of Text) 
Provides for through channel from the Gulf to mile 4 on 
Dog River, 25 by 300 feet through Horn Island Pass. 
thence 22 by 225 feet across Mississippi Sound and up 
150 feet in Pascagoula River above bridge, and up Dog 
River to mile 4, all subject to financial participation 
by local interests. 
Waived requirement for financial participation by local 
interests. 
Cutoff channel, 12 by 125 feet, from State Highway 63 
bridge to mile 4 on Dog River, via Robertson and 
Bounds Lakes. 
Modification to provide for channel dimensions of 35 by 
325 feet through Horn Island Pass, thence 30 by 275 feet 
across Mississippi Sound and up Pascagoula River to the 
railroad bridge, and a turning basin just below the 
bridge. 
Reimbursement of local interests for work done on Dog 
River cutoff ($44,000). 
Modification to provide for maintenance of 12- by 125-foot 
channel to mile 6 on Dog River, and maintenance of 30- by 
225-foot side channel from main ship channel in 
Mississippi Sound to the mouth of Bayou Casotte, thence 
30 by 300 feet in Bayou Casotte to a turning basin of the 
same depth I mile above the mouth. 
Deepening the Horn Island Pass channel to 38 feet and 
deepening the main ship channel in Mississippi Sound, 
the river channel to the railroad bridge, and the 
turning basin all to 33 feet. 
Enlarging Horn Island Pass Channel to 40 by 350 feet 
provision of an impounding area adjacent to and east of 
channel 40 feet deep, 200 feet wide, and about 1,500 feet 
long, enlarging main channel in Mississippi Sound and 
river channel to railroad bridge to 38 by 350 feet, and 
deepening turning basin in river and Bayou Casotte 
channels and basin to 38 feet. 
The Energy and Water 
Development Approp. Act 
1985 (P.L. 99-88) 
H. Doc. 33, 73d Cong., 
1st Sess. 
H. Doc. 555, 76th Cong., 
3d Sess. 
H. Doc. 559, 80th Cong., 
2d Sess. 
DPR (Sec. 107) 
H. Doc. 196, 92d Cong., 
2d Sess. 
H. Doc. 682, 62d Cong., 
2d Sess. 
River and Harbor 
Committee Doc. 12, 
63d Cong., 2d Sess. 
H. Doc. 188, 81st Cong., 
Ist Sess. 
H. Doc. 98, 86th Cong., 
1st Sess. 
H. Doc. 98, 86th Cong., 
Ist Sess. 
Chief of Engineers Report 
dated Nov. 3, 1960. 
H. Doc. 560, 87th Cong., 
2d Sess. 
10-36

MOBILE, ALABAMA DISTRICT 
TABLE 10-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Modification to provide for channel dimensions 12 x 80 feet 
extending about 2,750 feet from deep waters in the 
Pascagoula River into Krebs Lake to a turning basin, 
thence, along the south bank of the lake a channel with 
dimensions of 10 x 60 feet terminating at a second 
turning basin, a distance of about 2,750 feet. The 
project was constructed by hydraulic dredging with 
the disposal placed in an upland diked area. 
PENSACOLA HARBOR, FL. (See Section 18 of Text) 
A channel 30 feet deep at mean low water and 500 feet 
wide from the Gulf of Mexico to the dock line at the 
east end of the city of Pensacola, and also provided 
that $150,000 may be used in constructing or purchasing 
a seagoing suction dredge. 
Modified the existing project for the present inner 
channels and the deepening of the entrance channel 
to 32 feet. 
Improvement of Bayou Chico. 
June 13, 1902 
Aug. 30, 1935 
Aug. 26, 1937 
Mar. 2, 1945 
Aug. 27, 1962 
Oct. 27, 1965 
Jan. 20, 1987' 
July 24, 1946 
Oct. 23, 1962 
DPR (Sec. 107) 
H. Doc. 253, 72d Cong., 
Ist Sess. 
Rivers and Harbors 
Committee Doc. 96, 
74th Cong., 2d Sess. 
H. Doc. 743, 79th Cong., 
2d Sess. 
H. Doc. 528, 87th Cong., 
2d Sess. 
S. Doc. 94, 88th Cong., 
2d Sess. 
DPR (Sec. 107) 
H. Doc. 486, 79th Cong., 
2d Sess. 
H. Doc. 549, 87th Cong., 
2d Sess. 
10-37 
July 11, 1983' 
Modified improvement of Bayou Chico, FL. 
Maintenance of the entrance channel from the Gulf of 
Mexico to lower Pensacola Bay, a distance of about 5 
miles to dimensions of 35 feet deep and 500 feet wide; 
maintenance of a channel along the south side of the 
aircraft carrier mooring basin, a distance of about 2.5 
miles, to dimensions of 33 feet deep and 300 feet wide; 
a bay channel 33 feet deep, 300 feet wide, and about 2.1 
miles long; parallel approach channels to opposite ends 
of the inner-harbor channel, about 1.3 and 1.4 miles in 
length, each 33 feet deep, 300 feet wide, and flared at 
the junctions with the inner-harbor channel; and 
deepening the existing 500-foot wide inner-harbor channel 
to a depth of 33 feet and lengthening it to 3,950 feet. 
PERDIDO PASS CHANNEL, AL. (See Section 19 of Text) 
A 12- by 150-foot channel stabilized by twin rubblemound 
jetties, from the Gulf of Mexico into Perdido Pass, 
thence 9 by 100 feet into Perdido Bay with a spur channel 
of the same dimensions into Terry Cove. 
TOMBIGBEE RIVER AT 
COLUMBUS PORT, MS (See Section 20 of Text) 
Provides for a navigation channel 100 feet wide by 9 feet 
deep from the juncture of the old Tombigbee River channel and the Tenn-Tom 
Waterway upstream for about 1.5 miles to the port. Also, construction 
of a 200-foot by 200-foot wide turning basin. Will also include removal of 
about one acre of land at the entrance to the proposed channel. 
WATERWAY CONNECTING TOMBIGBEE AND 
TENNESSEE RIVERS, AL. AND MS. 
(See Section 21 of Text) 
A waterway connecting Tennessee and Tombigbee Rivers via 
East Fork of Tombigbee River, Mackeys and Yellow Creeks. 
Plan of improvement consists of three sections: river 
section, 9- by 300-foot channel for 149 miles between 
Demopolis and Amory, Ms.; canal section, 12 by 300 
feet for 46 miles from Amory to Bay Springs; divide section 
12 by 300 feet (except in the 27 mile-long divide cut in 
which bottom width would be 280 feet) for 39 miles from 
Bay Springs through dividing ridge to Tennessee. Total 
lift of 341 feet to be accomplished by 10 locks. Total 
length of project is 234 miles. 
OKATIBBEE LAKE, MS. (See Section 28 of Text) 
Provides for a dam and reservoir for flood control. 
water supply, water quality control, and recreation.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 10-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
June 7, 1968 
April 30, 19864 
March 24, 19863 
July 25, 19864 
May 6 19864 
July 2, 1986 
July 25, 19864 
October, 3 19852 
May 6, 1986 
April 18, 19862 
May 7, 19854 
TALLAHALA CREEK LAKE, PASCAGOULA RIVER, 
MS. (See Section 29 of Text) 
Provides for a dam and reservoir for flood control, water 
supply, water quality control, recreation, and fish and 
wildlife enhancement. 
BIG BROWN CREEK AND TRIBUTARY, PRENTISS 
COUNTY, MS (See Section 30 of Text) 
Emergency streambank protection to the banks and bottoms 
of the channels to retard erosion at the Marietta-Hazeldell 
Road Bridges crossing Big Brown Creek and Big Brown 
Creek tributary. 
BOLIGEE CANAL, BOLIGEE, AL 
(See Section 31 of Text) 
Clearing and snagging Boligee Canal from its confluence 
with the Tombigbee River upstream to mile 5.84. 
Work to be done from within channel and extend from 
top bank to top bank, an approximate width of 20 feet. 
CHATTAHOOCHEE RIVER, EUFAULA, AL 
(See Section 32 of Text) 
Shoreline protection consisting of riprap placed on the 
slopes for 300 feet along the State Docks and a 60 
linear foot sheet pile cutoff wall driven behind the 
docks wharf. Work will prevent further erosion and loss 
of fill material under the wharf. 
GOODFOOD CREEK, CHICKASAW COUNTY, MS 
(See Section 33 of Text) 
Bridge protection using riprap extending 30 feet up and 
downstream of the bridge. 
HIGHWAY 39 BRIDGE, GAINESVILLE, AL 
(See Section 34 of Text) 
Slope protection for a 2000-foot reach of the east bank of 
the Tombigbee River, immediately upstream of the 
existing Highway 39 Bridge. 
HOUSTON SCHOOL ROAD BRIDGE, ITAWAMBA 
COUNTY, MS (See Section 35 of Text) 
Bridge protection using riprap extending 62 feet downstream 
of centerline of bridge and extending upstream for 
99 feet. 
LEAF AND BOWIE RIVERS, HATTIESBURG, MS 
(See Section 36 of Text) 
Channel snagging; overbank clearing within the flood plains: 
riprap protection of the Southern Railroad and River 
Avenue Bridge piers, and removal of the Petal sewage 
lagoon. Work also includes installation of a flood 
warning system. 
MARTIN CREEK, PRENTISS COUNTY, MS 
(See Section 37 of Text) 
Emergency streambank protection to the banks and bottom of 
the channel to retard erosion at the Altitude Road Bridge 
crossing Martin Creek 
MURDER AND BURNT CORN CREEKS, 
BREWTON, AL (See Section 38 of Text) 
Non-structural project providing for the alleviation of 
flood problems at Brewton by the removal of 31 damageable 
structures from the 10-year flood plains of Murder 
and Burnt Corn Creeks. 
NOXUBEE RIVER RELIEF BRIDGE, SHUQUALAK, MS 
(See Section 39 of Text) 
The proposed project for streambank protection at Noxubee River relief 
bridge would consist of grading and protecting of banks with 24 
inches of riprap on 6 inches of bedding material and filter fabric. 
10-38 
H. Doc. 143, 90th Cong., 
Ist Sess. 
DPR (Sec. 14) 
DPR (Sec. 208) 
DPR (Sec. 14) 
DPR (Sec. 14) 
Urgent Supplemental 
Appropriations Act, 1986 
Public Law 99-349. 
DPR (Sec. 14) 
DPR (Sec. 205) 
DPR (Sec. 14) 
DPR (Sec. 205) 
DPR (Sec. 14)

MOBILE, ALABAMA DISTRICT 
TABLE 10-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
April 18, 1985 
August 23, 19842 
May 7, 19864 
Aug. 18, 1941 
July 23, 1958 
July 8, 1980 
July 19, 19844 
August 9, 19854 
Mar. 2, 1945 
June 28, 1954 
May 25, 1982 
Aug. 18. 1941 
Dec. 22, 1944 
SEWERLINE PROTECTION, VALLEY, AL 
(See Section 40 of Text) 
The project provides for the restoration of approximately 
1600 linear feet of streambank. This will consist of 
placing 1550 cubic yards of riprap on 4445 square yards 
of filter fabric. 
SOPE CREEK, MARIETTA, GA 
(See Section 41 of Text) 
The project provides for flood control measures along Sope 
Creek in Cobb County, Georgia, by clearing and snagging 
and evacuation of 13 structures. 
TALLABINELLA CREEK, CHICKASAW COUNTY, MS 
(See Section 42 of Text) 
Bridge protection using riprap extending 30 feet up and 
downstream of the bridge. 
TOMBIGBEE RIVER (EAST FORK), MS AND AL 
(See Section 43 of Text) 
Provides for alleviation of floods from the Tombigbee River 
by clearing, snagging, and excavation of 13 cut-off 
channels, and other related channel improvements. 
TOMBIGBEE RIVER TRIBUTARIES, MS AND AL 
(See Section 44 of Text) 
Provides for improvement of 22 tributaries of Tombigbee 
River. 
Extends project limits on Twenty Mile Creek and 
eliminates local cooperation for this remedial work. 
OLD HIGHWAY 82 BRIDGES, COLUMBUS, MS 
(See Section 45 of Text) 
The project provides restoration and stabilization along the 
right descending bank of the bridge. The stabilization 
would consist of 24 inches of riprap on 6 inches of 
bedding material and a filter fabric. The riprap 
placement would begin approximately 140 feet 
downstream of the centerline of the bridge and 
extend upstream along the right descending bank 
for 330 feet. 
INTERSTATE 59 BRIDGES, FOSTERS, AL 
(See Section 46 of Text) 
The project provides streambank protective measures at the 
bridges. Bank stabilization would consist of placing riprap 
along a 195-foot reach of the left descending bank 
at the bridge. 
MULTIPLE PURPOSE PROJECTS INCLUDING POWER 
ALABAMA-COOSA RIVERS, AL. AND GA. (See Section 
50 of Text) 
Provides for full development of Alabama-Coosa Rivers 
and tributaries for navigation, flood control, 
power, recreation, and other purposes. 
Authorized construction of Carters Lake, GA 
Claiborne Lock and Dam, AL, Jones Bluff Lock and 
Dam, AL, and Millers Ferry Lock and Dam, AL. 
Suspended comprehensive plan to permit non-Federal 
interests to develop Coosa River by constructing 
series of dams. 
Designated change of name from Jones Bluff to 
Robert F. Henry Lock and Dam. 
ALLATOONA LAKE, COOSA RIVER BASIN, GA 
(See Section 51 of Text) 
Provides for dam and reservoir for flood control, regulation 
of stream flow for navigation, development of hydroelectric 
power and recreation. 
DPR (Sec. 14) 
DPR (Sec. 205) 
DPR (Sec. 14) 
Special Report on Record 
in OCE. (Public Law 222,) 
77th Cong., 1st Sess. 
H. Doc. 167, 84th Cong., 
Ist Sess. 
PL (96-304) 
DPR (Sec. 14) 
DPR (Sec. 14) 
H. Doc. 414, 77th Cong., 
Ist Sess. 
Public Law 436, 83rd 
Cong. 
S.2034 97th 
Cong., 2d Sess. 
Public Law 228, 77th 
Cong., Ist Sess. 
H. Doc. 674, 76 Cong., 
3d Sess. 
10-39

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 10-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
APALACHICOLA, CHATTAHOOCHEE, AND FLINT 
RIVERS, AL., GA. AND FL. (See Section 52 of Text) 
Mar. 2, 1945 Development of Apalachicola, Chattahoochee, and Flint H. Doc. 342, 76th Cong., 
Rivers for navigation, flood control, hydropower, and 1st Sess. 
recreation. 
July 24, 1946 Modified general plan for full development of H. Doc. 300, 80th Cong., 
Apalachicola, Chattahoochee, and Flint River System Ist Sess. 
and authorized construction of Lake Sidney Lanier 
multipurpose reservoir. 
Dec. 22, 1944 Authorized recreation facilities. 
Jan. 27, 1981' Modified the existing project to provide for DPR (Sec. 107) 
nine foot deep by 100-foot wide side channel 
into the Apalachicola River Industrial Park, 
Blountstown, Fl. 
LAKE SIDNEY LANIER, GA. (See Section 52A of Text) 
July 24, 1944 Provision of recreation facilities. 
GEORGE W. ANDREWS LOCK AND DAM, AL. AND GA. 
(See Section 52B of Text) 
July 24, 1946 Construction of high dam at Walter F. George site H. Doc. 300, 80th Cong., 
and low dam at George W. Andrews site. 1st Sess. 
Dec. 22, 1944 Provided recreation facilities. 
JIM WOODRUFF LOCK AND DAM, GA. AND FL. 
(See Section 52C of Text) 
Dec. 22, 1944 Provided recreation facilities. 
WALTER F. GEORGE LOCK AND DAM, AL., AND GA. 
(See Section 52D of Text) 
May 19, 1953 Authorized construction of high dam at Walter F. George H. Comm. on 
site and low dam at Columbia site. Public Works 
WEST POINT LAKE, CHATTAHOOCHEE RIVER 
BASIN, GA. AND AL. (See Section 52E of Text) 
October 23, 1963 Authorized construction for flood control, power H. Doc. 570, 87th Cong., 
recreation, fish and wildlife development, and 2d Sess. 
streamflow regulation for downstream navigation. 
1. Authorized by Chief of Engineers under Section 107 of 1960 
River and Harbor Act. 
2. Authorized by Chief of Engineers under Section 205 of Flood 
Control Act of 1948. 
3. Authorized by Chief of Engineers under Section 208 of Flood 
Control Act of 1954. 
4. Authorized by Chief of Engineers under Section 14 of Flood 
Control Act of 1946. 
10-40

TABLE 10-C OTHER AUTHORIZED NAVIGATION 
(See Section 21 of Text) 
PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Report For Construction Maintenance 
Blackwater River, FL 1981 $41,650 $283,562 
Bluff Creek, MS' 1963 1,000 6,883 
Cahaba River, AL2 1894 45,000- 
Cadet Bayou, MS 1984 87,921 705,118 
Carrabelle Bar and Harbor, FL 1979 481,627 379,413 
Choctawhatchee River, FL and AL 1973 171,885 291,694 
Escambia-Conecuh Rivers, AL and FL 1981 208,499 1,102,094 
Holmes Creek, FL 1931 8,562 36,800 
LaGrange Bayou, FL 1972 289,496 82,693 
Leaf and Chickasawhay River, MS 2 1919 23,090 42,676 
Noxubee River, MS' 1902 47,528 14,472 
Ochlockonee (Ochlockney) River, GA and FL' 2 1900 5,000- 
Old Town Creek, MS I 2 1887 3,000- 
Oostanaula and Coosawattee River, GA' 2 1907 32,656- 
Panacea Harbor, FL 1979 122,383 92,352 
Pascagoula River, MS 1956 15,000 179,535 
Pass Christian Harbor, MS 1976 59,313 139,653 
Port St. Joe Harbor, FL 1984 1,960,862 2,885,1453 
Removing Water Hyacinths 1984 - 1,100,471 
St. Marks River, FL 1965 1,710,809 84,115 
Tallapoosa River, AL2 1893 43,972- 
Upper Chipola River, FL, from Marianna to 
its mouth' 2 1941 36,781 63,193 
Wolf and Jordan Rivers, MS 1979 29,195 481,515 
I. Abandonment recommended in H. Doc. 467, 69th Cong. 96-157, 1st Session. 
2. Uncompleted portion of project deauthorized by H. Doc. 3. Includes $80,000 contributed funds. 
TABLE 10-D OTHER AUTHORIZED BEACH EROSION CONTROL PROJECT 
(See Section 25 of Text) 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Report For Construction Maintenance2 
Harrison County, MS, shore protection' 1953 $1,133,000- 
1. Completed. 
2. Operation and maintenance is the responsibility of local 
interests. 
10-41

TABLE 10-E 
REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 48 of Text) 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Report For Construction Maintenance2 
Alabama River at Montgomery,. AL' 1965 $144,194- 
Armuchee Creek, GA 1966 115,547- 
Beaver Creek, Montezuma, GA 1958 149,815- 
Biloxi River at Lorraine Road, Harrison County, MS 1985 132,174- 
Black Creek, Gadsden, AL 1953 125,389- 
Black Warrior River, U.S. Hwy. 11 Bridge, Fosters, AL 1986 181,500- 
Burketts Creek, Amory, MS 1984 1,366,454- 
Chickasaw Bogue Creek, U.S. Highway 43 Bridge, Linden, AL 1985 121,718- 
Clanton, AL 1964 274,024- 
Collinsville, AL 1940 71,119- 
Gordons Creek, Hattiesburg, MS 1985 802,026- 
Houlka Creek, Chickasaw & Clay Counties, MS 1982 238,219- 
Jackson and East Jackson, MS 1979 7,190,200- 
Lake Douglas, Decatur County, GA 1970 164,998- 
Leaf River, County Road Bridge, Mahned, MS 1986 231,618- 
Little Cove Creek, Glencoe, AL 1965 113,849- 
Murder and Burnt Corn Creeks, Brewton, AL 1980 190,974- 
Murder Creek, East Brewton, AL 1986 903,474- 
Osborne Creek, Highway 362 Bridge, Prentiss County, MS 1985 250,000- 
Pearl River, Interstate 20 Bridges, Jackson, MS 1985 250,000- 
Prattville, Autauga Creek, AL 1946 649,280- 
Pumpkinvine Creek, Emerson, GA 1985 85,029- 
Rome, Coosa River, GA 1955 384,550- 
Sowashee Creek, Meridian, MS 1956 142,637- 
Sun Creek, Oktibbeha County, MS 1984 55,569- 
Town Creek, Americus, GA 1965 340,409- 
Trim Cane Creek, Oktibbeha County, MS 1984 145,519- 
Trussville, AL 1965 141,334- 
Twenty Mile Creek, Airport Road Bridge, Frankstown, MS 1986 215,860- 
West Point, Chattahoochee River, GA 1955 599,637- 
Wolf Creek, Highway 362 Bridge, Prentiss County, MS 1985 114,753- 
Wolf Creek, U.S. Hwy. 45 Bridge, Prentiss County, MS 1986 154,641- 
Yellow Jacket Creek, Hogansville, GA 1966 330,734- 
1. Engineering, design, supervision, and administration (no con- 2. Operation and maintenance is the responsibility of local 
struction work has been done. Includes $17,000 for pre- interests. 
authorization studies. 
TABLE 10-G DEAUTHORIZED PROJECTS 
(See Section 25 of Text) 
Year of Last Deauthorization Date 
Project Type Full Report Document Deauthorized 
Bayou Galere, MS' Navigation 1946 H. Doc. 192, 94th Cong., 5 Aug. 1977 
1st Sess., as amended. 
GIWW; Apalachicola Bay to Navigation 1986 Public Law 99-662, 17 Nov. 1986 
St. Marks River, FL 99th Congress 
Lazer Creek Lake, GA Hydroelectric power 1986 Public Law 99-662, 17 Nov. 1986 
99th Congress 
Lower Auchumpkee Creek Lake, Hydroelectric power 1986 Public Law 99-662, 17 Nov. 1986 
GA 99th Congress 
Pensacola Harbor Modification, FL Navigation 1986 Public Law 99-662, 17 Nov. 1986 
99th Congress 
Spewrell Bluff Lake, GA Hydroelectric power 1986 Public Law 99-662, 17 Nov. 1986 
99th Congress 
1. H. Doc. 96-157 deauthorized uncompleted portions of 
certain projects as shown in Table 10-C. 
10-42

MOBILE, ALABAMA DISTRICT 
TABLE 10-H NAVIGATION WORK UNDER SPECIAL AUTHORIZATION 
(See Section 23 of Text) 
Fiscal Year 
Study Authority 1987 Costs 
Ocean Springs Harbor, MS 107 28,707 
Shell Point, Wakulla County, FL 107 59 
Soldiers and Palmetto Creek, AL 107 $19,978 
South Fork Bon Secour River, AL 107 5,450 
Total $54,194' 
1. Excludes construction costs of $723 for Biloxi Harbor, Harrison 
County Canal, MS; $60,784 for Dog River Channel, AL and 
$452,535 for Tombigbee River, Columbus, MS. 
TABLE 10-I BEACH EROSION CONTROL PROJECT UNDER 
SPECIAL AUTHORIZATION (See Section 27 of Text) 
Fiscal Year 
Study Authority 1987 Costs 
Boggy Bayou Shoreline, Valparaiso, FL 103 $11,541 
Total $11,541 
TABLE 10-J FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
(See Section 49 of Text) 
Fiscal Year 
Study Authority 1987 Costs 
Big Wills Creek, Etowah County, AL 205 $ 7,317 
Chattahoochee River, Vinings, GA 205 18,223 
Cochgaleechee Creek, Phenix City, AL 205 1,868 
Collinsville, AL 205 7,378 
Cribbs Mill Creek, Tuscaloosa, AL 205 58,145 
Eslava Creek, Mobile, AL 205 181,328 
Five Mile Creek, Brookside, AL 205 12,864 
Glencoe, AL 205 62,866 
Greens Creek, Petal, MS 205 14,111 
Kinchafoonee Creek, Lee County, GA 205 2,632 
Magby Creek, Columbus, MS 205 4,703 
Mill Creek, Dalton, GA 205 12,503 
Mill Creek, Sumrall, MS 205 30,164 
Mixons Creek, Lamar County, MS 205 15,175 
Proctor Creek, Atlanta, GA 205 17,632 
Raccoon Creek, Baconton, GA 205 38,208 
Silver Creek, Rome, GA 205 19,842 
Sowashee Creek, Meridian, MS 205 226,458 
Three Mile Creek, Mobile, AL 205 218,592 
Tibbee Creek, Reform, AL 205 442 
Toulmins Spring Branch, Prichard, AL 205 8,531 
Trim Cane Creek, MS 205 15 
Upper Gordons Creek, Hattiesburg, MS 205 31,309 
Village Creek, AL 205 47,052 
Coosa River, Whartons Bend Road, AL 14 415 
Hurricane Creek, Marietta Hazel, MS 14 7,018 
St. Louis Bay Shoreline, Hancock County, MS 14 3,800 
Elliotts Creek, Moundville, AL 208 16,845 
Fish River, Baldwin County, AL 208 9,780 
Little Wills Creek, Attalla, AL 208 7,300 
Total $1,082,516 
10-43

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 10-K RECONNAISSANCE AND CONDITION SURVEYS 
(See Section 24 of Text) 
Cost During 
Project Date of Survey Fiscal Year 
Blackwater River, FL May, 1987 869 
Bon Secour, AL June, 1987 1,681 
Cadet Bayou, MS May, 1987 20,404 
Carrabelle Harbor, FL August, 1987 5,217 
Escambia Bay, FL July, 1987 26,316 
Fly Creek, AL September, 1987 2,090 
La Grange Bayou, FL August, 1987 5,556 
Panacea, FL August, 1987 869 
Panama City, FL December, 1986 24 
Pass Christian, MS June, 1987 36,863 
Pensacola Harbor, FL July, 1987 35,045 
Port St. Joe Harbor, FL March, 1987 12,279 
St. Marks River, FL August, 1987 3,882 
Wolf and Jordan Rivers, MS July, 1987 21,286 
Total $172,381 
TABLE 10-L ALABAMA-COOSA RIVERS, ALA. AND GA. 
DEVELOPMENT PROPOSED UNDER EXISTING PROJECT 
(See Sections 50 and 51 of Text) 
Claiborne Millers Ferry Robert F. Henry Carters Allatoona 
Proposed Structures Lock and Dam Lock and Dam Lock and Dam Lake Dam3 Dam 
Miles above mouth of river 81.1' 42.2' 245.4' 26.82 47.84 
Nearest town Claiborne, Ala. Camden, Ala. Benton, Ala. Carters, Ga. Cartersville, Ga 
Distance (miles) 7 10 3 2 4 
Greatest lock length available 
for full width (feet) 600 600 600 -- 
Width of lock chamber (feet) 84 84 84 - - 
Maximum lift (feet) 30 48 47 - - 
Elevation of normal pool surface 
(mean sea level) 35 80 125 1072 Varies seasonally 
Depth over sills at low water 13 Upper 15 Upper 15 -- 
(feet) Lower 13 Lower 12 
Character of foundation Rock Rock Rock Rock Rock 
Kind of spillway Gated and Gated Gated Gated Gated 
Fixed Crest 
Height of dam (feet) 95.5 99.5 94 451 190 
Type of construction Concrete Concrete Concrete Rock-fill Concrete 
Earth Core 
Total reservoir capacity 
(acre-feet) 96,360 331,800 234,200 472,800 670,050 
Power development (kw) - 75,000 68,000 500,000 74,000 
Percent complete 100 100 100 100 100 
Cost to date:5 $27,997,450 $63,124,643 $83,360,800 $111,140,340 $35,709,084 
I. Above mouth of Alabama River (river miles). 
2. Above mouth of Coosawattee River (river miles). 
3. Reregulation dam (Carters) 25.3 (river miles). 
4. 
5. 
10-A. 
Above mouth of Etowah River (river miles). 
Includes cost of added recreation facilities as shown in Table 
10-44

TABLE 10-M 
APALACHICOLA, CHATTAHOOCHEE, AND FLINT RIVERS, ALA., GA., 
AND FLA., LOCKS AND DAMS AND MULTIPLE-PURPOSE 
DEVELOPMENT INCLUDED IN EXISTING PROJECT 
(See Section 52 of Text) 
Existing Projects 
Jim George W. Walter F. Buford Dam 
Woodruff Andrews George Lake 
Lock Lock Lock West Point Sidney 
and Dam and Dam and Dam Lake Lanier 
Miles above mouth 107.6' 46.52 75.02 201.42 348.32 
Nearest town Chattahoochee, Columbia, Al. Ft. Gaines, West Point, Buford, Ga. 
Fl. Ga. Ga. 
Distance (miles) 1 1 2 2.8 5 
Greatest lock length 450 450 450 - - 
available for full width 
(feet) 
Width of chamber (feet) 82 82 82 -- 
Maximum lift (feet) 33 25 88 - - 
Elevation of normal pool 77 102 190(Summer) 635(Summer) 1070 
surface (msl) 185(Winter) 625(Winter) 
Depth over sills at low 14 13 13 -- 
water (feet) 
Character of foundation Limestone Limestone Limestone Rock Rock 
Kind of spillway Fixed-gated Fixed-gated Gated Gated Fixed 
Height of dam (feet) 67 62 114 95 192 
Type of construction Concrete Concrete Concrete Concrete Earth 
and Earth and Earth and Earth 
Total reservoir capacity 367,300 18,180 934,400 604,500 2,554,000 
(acre-feet) 
Power development 30,000 - 130,000 73,875 86,000 
(kilowatts) 
Percent complete 100 100 100 100 100 
Year opened to navigation 1954 1962 1963 - - 
Estimated cost: - - - - - 
Cost to date:3 $47,978,749 $13,038,427 $98,547,7834 $131,510,509 $53,037,419 
i. Above the mouth of Apalachicola River (river miles). 
2. Above mouth of Chattahoochee River (river miles). 
3. Includes cost of added recreational facilities as shown in Table 10-A. 
4. Includes $333,198 cost of land for wildlife refuge and $10,252,003 for major 
rehabilitation. 
10-45

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 10-N BLACK WARRIOR AND TOMBIGBEE RIVERS, ALA. 
(See Section 7 of Text) 
Armistead I. William John Hollis 
Coffeeville Demopolis Selden Bacon Oliver Holt Bankhead 
Lock Lock Lock Lock Lock Lock 
and Dam and Dam and Dam and Dam and Dam and Dam' 
Milesabove Mobile2 116.7 213.2 261.1 338.2 347.0 365.5 
Nearest town (Alabama) Coffeeville Demopolis Eutaw Tuscaloosa Tuscaloosa Oak Grove 
Distance (miles) 3)within city) 6 15 
Lock: 
Greatest length available 
for full width (feet) 600.0 600.0 600.0 450.0 600.0 600.0 
Width of chamber (feet) 110 110 110 95 110 110 
Maximum lift (feet) 34 40 22 28 64 68 
Depth over sills at low 
water (feet) 13.0 13.0 13.2 12.0 13.0 14.0 
Character of foundation Rock Rock Sand, clay Hard shale Shale, Sandstone 
sandstone 
Kind of spillway Fixed-Gated Fixed Gated Fixed Gated Gated 
Type construction 
Lock Concrete Concrete Concrete Concrete Concrete Concrete 
Dam Concrete Concrete Earth- Concrete Concrete Concrete 
Concrete 
Year completed 1965 1962 1962 1940 1969 1985 
Year opened to navigation 1960 1954 1957 1939 1966 1975 
Actual cost of lock and dam3 $21,597,264 $19,774,583 $13,295,553 $4,450,874 $28,100,000 $47,258,6514 
1. Single lift lock. 
2. Navigation mileage from foot of Government Street, Mobile, 
Al.
3. Excludes cost of adding recreation facilities. 
4. Cost to date (FY 87) for replacement of single lift lock which 
was essentially completed in FY 80. Excludes $1,435,636 cost of land 
submerged, damage to structures, and cost of spillway. Also 
excludes $3,824,859 cost of original double lift lock. 
10-46

MOBILE, ALABAMA DISTRICT 
TABLE 10-0 
TENNESSEE-TOMBIGBEE WATERWAY, ALABAMA AND MISSISSIPPI 
(See Section 21 of Text) 
Existing Projects 
Gainesville Aliceville Columbus Aberdeen Lock A Lock B Lock C Lock D Lock E Bay Springs 
Lock Lock Lock Lock and and and and and Lock and 
and Dam and Dam and Dam and Dam Spillway Spillway Spillway Spillway Spillway and Dam 
Miles above mouth' 266 307 335 358 371 376 39 398 407 412 
Nearest town Gainesville, AL Aliceville, AL Columbus, MS Aberdeen, MS Amory, MS Smithville, AL Fulton, MS Fulton, MS Belmont, MS Tupelo, MS 
Greatest lock length 600 600 600 600 600 600 600 600 600 600 
available for full 
width (feet) 
Width of Chamber (feet) 110 110 110 110 110 110 110 110 110 
Maximum lift (feet) 36 27 27 27 30 25 25 30 30 84 
Elevation of normal 109 136 163 190 220 245 270 300 330 (Summer)414 
pool surface (msl) (Winter)409 
Depth over sills at 15 15 15 15 15 18 18 18 18 18 
low water (feet) 
Character of foundation Mooreville Eutaw Form. Eutaw Form. Eutaw Form. Eutaw Form. Eutaw Form. Gordo Form. Eutaw Form. Gordo Form. Sandstone 
Chalk Sand & Clay Sand & Clay Sand Lam. Sand Sand & Clay Clay Sand Clay and Shale. 
Kind of spillway Fixed & Fixed & Gated Gated Gated Gated Gated Gated Gated N/ A 
Gated Gated 
Height of dam (feet) 56 57 57 57 46 48 53 52 44.5 103 
Type of construction Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete 
& Earth & Earth & Earth & Earth & Earth & Earth & Earth & Earth & Earth 
Total reservoir capacity 45,290 655 59,483 31,564 4,400 19,000 13,300 24,900 6,900 (Summer)180,000 
(acre-feet) (Winter) 143,000 
Percent complete 100 100 100 100 100 100 100 100 100 100 
Year opened to 1978 1979 1981 1984 1985 1985 1985 1985 1985 1985 
navigation 
Estimated Cost $103,214,000 151.255,000 182,650,000 128,262,000 102,685,000 96,905,000 71,375,000 98,205,000 88,173,000 147,000,000 
Cost to date $100,010,600 143,190,800 174,620,500 112,620,200 92,190,500 93,106,700 62,197,000 89,610,800 76,917,700 130,398,000 
1. Miles above Mobile, Alabama (Mile 0.00 is at Bankhead Tunnel on U.S. Highway 90) 
IH- 
0

TABLE 10-P COMPLETED FLOOD INSURANCE STUDIES AND FLOOD 
HAZARD INFORMATION REPORTS FOR FY 1982 THRU FY 1987' 
(See Section 55 of Text) 
Date Federal 
Study Requesting Agency Completed Cost 
Flood Insurance Studies 
Anniston, Alabama Federal Emergency Management Agency (FEMA) Apr 82 $80,900 
Calhoun County, Alabama Federal Emergency Management Agency (FEMA) Apr 82 61,200 
Cave Springs, Georgia Federal Emergency Management Agency (FEMA) Jan 84 22,500 
Columbus, Mississippi Federal Emergency Management Agency (FEMA) Feb 85 36,000 
Lowndes County, Mississippi Federal Emergency Management Agency (FEMA) Feb 85 229,000 
Aberdeen, Mississippi Federal Emergency Management Agency (FEMA) May 85 35,000 
Amory, Mississippi Federal Emergency Management Agency (FEMA) May 85 50,000 
Cherokee County, Georgia Federal Emergency Management Agency (FEMA) July 85 168,000 
Monroe County, Mississippi Federal Emergency Management Agency (FEMA) Oct 85 140,000 
Floyd County, Georgia Federal Emergency Management Agency (FEMA) Dec 85 330,000 
Dale County, AL Federal Emergency Management Agency (FEMA) Dec 86 82,000 
Lauderdale County, MS Federal Emergency Management Agency (FEMA) Mar 87 144,000 
Houston County, AL Federal Emergency Management Agency (FEMA) Apr 87 114,000 
St. Clair County, AL Federal Emergency Management Agency (FEMA) Jun 87 43,000 
Special Flood Hazard Information 
Chattahoochee River, Supplement Atlanta Reg. Planning Mar 82 5,000 
to Buford to Whitesburg Report Commission 
Oothcalooga Creek Gordon Co., GA Board of Jun 82 10,000 
Commissioners 
Canton Creek, Ga. City of Canton, Ga. Dec 82 3,000 
Oktasasi Creek, Ala. Alexander City, Ala. Jan 83 3,000 
Cordele Creek & City of Cordele, Ga. May 83 4,000 
Malcolm Branch, Ga. 
Hull Branch, MS East Central Planning and Jun 84 7,000 
Development District 
Percosin Creek & Tribs., GA City of Albany, GA Nov 84 14,000 
Coosawattee, Ellijay and Cartecay City of Ellijay, GA Jul 86 22,000 
Rivers, Vicinity of Ellijay, GA 
Rocky Creek and Basie Branch, MS Ellisville, MS Jan 87 19,000 
Springers Branch, MS Starkville, MS May 87 13,000 
Dixie Creek, GA La Grange, GA Jun 87 15,000 
Little Scooba Creek, MS Scooba, MS Jun 87 18,000 
1. For list of reports completed by Mobile District for FY 1965 
thru FY 1974, see FY 1974 Annual Report, page 10-50; reports 
completed in FY 1975 see FY 1975 Annual Report, page 10-44; and 
for reports completed in FY 1976 and FY 1977, see FY 1977 Annual 
Report, page 10-46. See page 10-48 FY 1978 Annual Report for FY 
1978 reports, and see page 10-43 FY 1984 Annual Report for FY 
1979 through FY 1984 reports 
10-48

NEW ORLEANS, LA, DISTRICT * 
District comprises a portion of Louisiana, including 
drainage area of Red River south of Fulton, AR, 
embraced in drainage basins tributary to Mississippi 
River and Gulf of Mexico, except Mississippi River 
above mile 325.5 above Head of Passes, drainage area 
of Ouchita-Black River Basin, and small eastern and 
western portions of Louisiana tributary to Pearl River 
and Sabine River and Lake. 
It includes sections of the Gulf Intracoastal Waterway 
from Lake Borgne Light 29 at the mouth of Pearl River 
to Sabine River, and the Passes of the Mississippi 
River. It exercises jurisdiction over flood control work 
on Mississippi River from mile 325.5 AHP to Gulf of 
Mexico; Atchafalaya River; and in Atchafalaya Basin; 
and maintenance of project navigation channel of 
Mississippi River below mile 325.5 AHP, under supervision 
of President, Mississippi River Commission 
(MRC), and Division Engineer, Lower Mississippi 
Valley Division. 
IMPROVEMENTS 
Navigation 
1. Leland Bowman Lock, LA 
(Replacement of Lock) 
(Formerly Vermilion Lock, LA ........ 
2. Mississippi River, Baton Rouge 
to Gulf of Mexico, LA ................ 
3. Mississippi River-Gulf Outlet, LA ...... 
4. Mississippi River Ship Channel, 
Gulf to Baton Rouge, LA .............. 
5. Waterway from Intracoastal 
Waterway to Bayou Dulac, LA 
(Bayous Grand.Caillou and 
LeCarpe, LA ........................ 
6. Navigation work under 
special authorization ................. 
Flood Control 
7. Grand Isle & vicinity, LA ............ 
8. Lake Pontchartrain and vicinity, 
LA, (hurricane protection) ............ 
Page Flood Control (cont.) 
9. Larose to Golden Meadow, LA 
(hurricane protection) ... ....... .. 
11-2 10. Morgan City and vicinity, LA 
(hurricane protection) ............. 
11-2 11. New Orleans to Venice, LA, 
11-3 (hurricane protection) ................. 
12. Inspection of completed flood 
11-4 control projects .. ........................... 
13. Flood control work under special 
authorization ........................ 
11-5 Tables 
Table 11-A 
11-5 Table 11-B 
Table 11-C 
11-5 
11-6 
Table 11-D 
Table 11-E 
Cost and Financial Statement .. 
Authorizing Legislation ...... 
Other Authorized Navigation 
Projects ....................... 
Other Authorized Flood 
Control Projects .............. 
Active General Investigations .. 
Page 
11-7 
11-8 
11-8 
11-9 
11-10 
11-11 
11-13 
11-16 
11-18 
11-20 
11-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. LELAND BOWMAN LOCK, LA 
(REPLACEMENT OF LOCK) 
(FORMERLY VERMILION 
LOCK, LA) 
Location. In the Louisiana section of the Gulf Intracoastal 
Waterway near Abbeville, Vermilion Parish, 
LA, about 163 miles west of Harvey Lock. 
Existing project. The present Leland Bowman 
Lock, located in the most heavily utilized section of the 
Gulf Intracoastal Waterway, is the controlling 
structure in both width and depth. The lock is used for 
navigation and flood control (prevention of salt water 
intrusion). The tumbler-type gates are unsatisfactory 
for the dual purpose. (Flood Control-Navigation) 
operation required, since once the gates are lowered to 
pass flood flows, they cannot be safely raised until the 
differential stage across the lock is reduced to about 
0.5 foot. The replacement lock also will provide a 
larger and more efficient outlet for floodwaters. 
Estimated cost for new work (October 1982) is 
$32,200,000 Federal and $240,000 non-Federal. The 
project was renamed "Leland Bowman Lock 
(Replacement)" by House Resolution 4284 dated Sep. 
21, 1981 (House Report 97-234.) 
Local cooperation. Provide all lands, easements 
and rights-of-way for construction of the project and 
hold and save the United States free from damages 
due to construction and maintenance works. The 
Vermilion Parish Police Jury furnished assurances 
covering all requirements of local cooperation, 
including PL 91-611 and PL 91-646, on Mar. 19, 1975. 
These assurances were in the process of being accepted 
by the United States, when the Water Resources 
Development Act of 1976 was enacted authorizing the 
110-foot-wide lock. Amended assurances of local 
cooperation were accepted on behalf of the United 
States by the Secretary of the Army on Jul. 5, 1977. 
The Vermilion Parish Police Jury on May 26, 1981 
granted right of entry for construction of project. 
Terminal facilities. None. 
Operations and results during fiscal year. Construction 
was initiated Oct. 15, 1981, and completed 
Mar. 9, 1985 at a cost of $26,781,241. 
Condition as of Sep. 30. The project is 100 percent 
complete. 
2. MISSISSIPPI RIVER, 
BATON ROUGE TO 
GULF OF MEXICO, LA 
Location. This reach of the river flows southeasterly 
through southeastern portion of Louisiana. At Head of 
Passes, approximately 233.1 miles below Louisiana 
Highway Commission bridge at Baton Rouge, river 
branches into three main passes: Southwest Pass, 
South Pass, and Pass a Loutre, two of which, 
Southwest Pass and South Pass, are improved under 
existing project. Head of Passes to mouths of 
Southwest and South Passes are 20.1 and 13.5 miles, 
respectively. Mouth of Southwest Pass is 141 miles 
west of Mobile, AL, and 349 miles east of Galveston, 
TX. Mouth of South Pass is 18.5 miles northeast of 
mouth of Southwest Pass. (Refer to NOAA Coast 
Charts Nos. 11361, 11364, and 11369; MRC alluvial 
valley map, and Zachary, Baton Rouge, White Castle, 
Donaldsonville, Thibodaux, Mount Airy, Bonnet 
Carr&, Hahnville, New Orleans, St. Bernard, 
Barataria, Pointe a la Hache, Black Bay, Empire, 
Forts, West Delta, East Delta, and Southwest Pass 
quadrangles and 1980 (48th edition) folio of flood 
control and navigation maps, Mississippi River, Cairo, 
IL, to Gulf of Mexico, LA, published by the MRC.) 
Previous projects. For details see page 552 of 
Annual Report for 1963. 
Existing project. Provides for channel dimensions 
as follows: Between a line one-tenth mile below Louisiana 
Highway Commission bridge at Baton Rouge 
129.3 miles to upper port limits of New Orleans, 40 by 
500 feet mean low water; within limits of port of New 
Orleans, where that authority has jurisdiction over 
both banks of river, a distance of 17.8 miles, 35 by 
1,500 feet, measured from a line generally 100 feet 
from face of left bank wharves, but not closer than 100 
feet to wharves on right bank; within 35- by 1,500-foot 
channel in port limits of New Orleans, 40 by 500 feet; 
from lower limits of port of New Orleans 86.7 miles to 
Head of Passes, 40 by 1,000 feet; Southwest Pass, 17.5 
miles from Head of Passes to jetty channel, 40 by 800 
feet; 4.1 miles in the Southwest Pass bar and jetty 
channel, 40 by 600 feet; South Pass from Head of 
Passes to outer ends of jetties, 13.5 miles, 30 by 450 
feet; and 1.2 miles in the South Pass bar channel, 30 by 
600 feet. Plane of reference below New Orleans is 
mean low gulf. Plane of reference above and through 
New Orleans is low water reference plane. General 
plan of improvement of Southwest Pass provides for 
constructing pass to uniform cross section with about 
1,420-foot surface width by means of jetties, spur 
dikes, and bulkheads; for channel maintenance by 
dredging from Cubits Gap, mile 3.5 AHP through the 
gulf entrance channel, mile 21.5 BHP; for construction 
of small revetted openings through narrow portions of 
banks of pass for purpose of strengthening and 
nourishment of banks; for closure of minor outlets not 
required for maintenance of banks; for construction of 
sills to prevent enlargement of the Venice Jump and 
Cubits Gap; for repairs to sill across Pass a Loutre and 
bank revetment at Head of Passes; for construction of 
dikes with a view to reducing width of river above 
Head of Passes; for construction of a submerged 
deflecting dike above Head of Passes; and for other 
minor work. East jetty is about 24,950 feet long and 
west jetty 19,699 feet. Jetties are composed of a 
substructure of brush mattresses, orginally built to 
about elevation of mean low gulf, surmounted with a 
superstructure of concrete blocks and large riprap 
and/or stone rubble mound of core and cover stone. 
11-2

NEW ORLEANS, LA, DISTRICT 
Spur dikes are constructed of round timber piles and/ 
or triangular prestressed concrete piles, with riprap at 
the landward ends to connect the dikes to the bank 
line. General plan of improvement of South Pass 
provides for construction and maintenance of jetties 
and spur dikes; for channel maintenance by dredging 
from Head of Passes through the Gulf Entrance 
Channel beyond mile 13.5 BHP; maintenance of a sill 
across Pass a Loutre, and for seaward extension of east 
jetty at mouth of pass; removal of west dike and 
construction of spur dikes and bank revetment at Head 
of Passes; removal of false point at head of South Pass 
to bottom elevation of minus 45 feet and revetment of 
new bank line and construction and maintenance of 
east and west headland structure at Head of Passes. 
East jetty foundation is 12, 070 feet long; inner east 
jetty is 11,170 feet long; west jetty is 7,820 feet long; 
and inner west jetty is 4,710 feet long. Jetties are 
composed of a substructure of brush mattresses 
surmounted by a superstructure of stone and/or 
concrete blocks and large riprap. Plane of reference is 
mean low gulf. Variation of water surface is 16 inches 
at mouths and 10 inches at head of the passes, due to 
tides. Extreme range of tides at mouths of passes due 
to hurricanes in about 10 feet. At New Orleans 
extreme range of water surface is about 20 feet due to 
floods. At Baton Rouge extreme range is about 45 feet 
due to floods. 
Estimated cost of existing project (October 1986) is 
$343,000,000 Federal. In addition, Coast Guard is to 
provide navigation aids at an estimated cost of $29,000 
and $2,000,000 Non-Federal pipeline relocations. 
Local cooperation. None required, except for modification 
of project in connection with Mississippi 
River-Gulf Outlet, which is reported separately. 
Terminal facilities. Piers, wharves, or docks serve 
the Port of New Orleans. Most wharves on east or left 
bank parallel riverbank forming nearly a continuous 
covered quay about 10 miles long. Public wharves 
controlled by Board of Commissioners, Port of New 
Orleans (the Dock Board), cover 62 percent of 
improved waterfront. These facilities include a 
shipside grain elevator, general cargo and cotton 
wharves, fruit landings, bunkering facilities, terminal 
warehouses, railroad terminals, marine railways, and 
drydocks. (For further details see Port Series No. 20, 
"The Port of New Orleans, LA" revised 1977.) A 
foreign trade zone is located in Port of New Orleans. 
City of Baton Rouge has a reinforced concrete dock for 
deep-sea vessels with mechanical-handling facility. 
Attached to downstream end of wharf is a floating 
wharf boat 231 by 40.5 feet, of 2,000-ton capacity. 
Facilities are served by a transfer boat and municipal 
terminal having a capacity of 40 cars per day. Private 
terminals for handling oil, grain, bauxite ore, and 
other products are at points on both sides of river 
between New Orleans and Baton Rouge. Facilities are 
considered adequate for existing commerce. (For 
further details, see "Port Facilities" included in "Flood 
Control and Navigation Maps of the Mississippi River, 
Cairo, IL, to the Gulf of Mexico, LA," published 
annually by the MRC, and Port Series No. 19, vol. 1, 
"Port St. Joe, FL, Pensacola, FL, Baton Rouge, LA, 
and Lake Charles, LA," revised 1979.) 
Operations and results during fiscal year. The 
Supplement II to the GDM was completed in March 
1986 and the environmental impact statement (EIS) 
for this supplement was completed in May 1986. 
Maintenance: (a) Baton Rouge to New Orleans: One 
dustpan dredge removed 5,133,000 cubic yards of 
shoal material at a cost of $2,672,000. 
(b) New Orleans Harbor: Two leased dredge contracts 
removed 5,368,000 cubic yards of material at 
a cost of $1,653,000. 
(c) Cubit's Gap (mile 3 AHP) through Southwest 
Pass: One hopper dredge and two cutterhead dredges 
removed 16,549,000 cubic yards of shoal material at 
a cost of $13,711,000. 
(d) Southwest Pass Channel Enlargement: One government 
hopper dredge and two cutterhead dredges 
removed 13,956,000 cubic yards of shoal material at 
a cost of $4,450,000. 
(e) Southwest Pass: Work was completed on two pile 
dike repair contracts at a total cost of $1,668,000. In 
addition, repairs were performed to a foreshore rock 
dike between miles 7.5 and 8.6 BHP on the right 
descending bank at a cost of $319,000. Hired labor 
repairs to pile dikes totalled $163,000, and hired labor 
repairs to the crib dike at the west headland of Head 
of Passes cost $300,000. 
Condition as of Sep. 30. The existing project is 50 
percent complete. Deepening Southwest Pass to 40 feet 
mean low gulf, as authorized by the modification of 
Mar. 2, 1945, was completed in September 1963. Deepening 
the channel to 40 feet mean low water from Baton 
Rouge to New Orleans and to 40 feet mean low gulf 
in New Orleans Harbor, as authorized by the modifications 
of Oct. 23, 1962, was completed in August 
1963. The foreshore dike Mile 0.5 to Mile 4.0 AHP on 
the right descending bank is complete. The foreshore 
dike Mile 0.6 to Mile 7.2 BHP on the left descending 
bank is complete. The foreshore dike Mile 0.8 to Mile 
4.7 BHP right descending bank is complete. The foreshore 
dike Mile 4.0 to Mile 3.0 AHP right descending 
bank is complete. 
3. MISSISSIPPI RIVER-GULF 
OUTLET, LA 
Location. In State of Louisiana and extends from 
existing Inner Harbor Navigation Canal at a point 
7,500 feet north of existing lock and about 11,000 feet 
from Mississippi River, to a turning basin south of 
Michoud, LA, and then as a land and water cut from 
turning basin south of Michoud, LA, southeasterly to 
and along south shore of Lake Borgne and through 
marshes to and through Chandeleur Sound to 38-foot 
contour in Gulf of Mexico. (Refer to NOAA Coast 
Charts Nos. 11340, 11360, 11363, 11369, 11371, and 
11-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
11373. Also see MRC 1980 (48th edition) folio of maps, 
Mississippi River-Cairo, IL, to Gulf of Mexico, LA.) 
Existing project. Provides for a seaway canal, 36 
by 500 feet, extending 76 miles as a land and water 
cut from Michoud southeasterly to and along south 
shore of Lake Borgne, and across Chandeleur Sound 
to Chandeleur Island and increasing gradually to 38 
by 600 feet in Gulf of Mexico, with protective jetties 
at entrance, a permanent retention dike through Chandeleur 
Sound, and a wing dike along islands as 
required. It also provides for an inner tidewater harbor 
consisting of 1,000- by 2,000-foot turning basin 36 feet 
deep at landward end of seaway canal, and a connecting 
channel 36 by 500 feet wide extending westerly along 
Gulf Intracoastal Waterway from turning basin to 
Inner Harbor Navigation Canal, including construction 
of a suitable highway bridge with approaches to 
carry Louisiana State Highway 47 (formerly 61) over 
channel. Plan further provides for future construction 
of a channel and lock in the vicinity of Meraux to 
furnish an additional connection between tidewater 
harbor and Mississippi River. Estimated cost for new 
work (October 1987) is $509,000,000 Federal and 
$273,800,000 non-Federal. This does not include modification 
for Mississippi River-Gulf Outlet, Michoud 
Canal, which is reported separately. The Federal cost 
excludes $45,000 for aids to navigation by U.S. Coast 
Guard. 
Local cooperation. Requirements of local cooperation 
are fully described on page 11-4 of FY 1986 
Annual Report. 
Terminal facilities. The only facility on the waterway 
is the Public Bulk Terminal of New Orleans 
constructed by Board of Commissioners, Port of New 
Orleans, on left descending bank at mile 63. Two newcontainer 
ship berths have begun operation at the 
Industrial Canal end of the seaway. 
Operations and results during fiscal year. New 
work by hired labor: Engineering and economic studies 
continued for the new lock and connecting channels 
feature. 
Maintenance dredging under three contracts in the 
Gulf Entrance Channel, Breton Sound and Michoud 
Canal include the removal of 15,206,134 cubic yards 
of material at a cost of $4,870,308. The U.S. Hopper 
Dredge Wheeler removed 2,042,213 cubic yards of 
material in the Gulf Entrance Channel at a cost of 
$2,723,007. 
Condition as of Sep. 30. Construction was initiated 
March 1958 and entire project is 75 percent complete. 
The channel was opened to navigation Jul. 25, 1963, 
and completed Jan. 20, 1968. Paris Road Bridge was 
opened to traffic Jul. 21, and completed Nov. 14, 1967. 
Approximately 3 miles of first- and second-lift stone 
dikes have been constructed on north side of channel 
and approximately 8.27 miles of first-lift and 7.34 miles 
of second-lift stone dikes have been constructed on south 
side of channel in Breton Sound. Principal work 
required to complete project, construction of new ship 
lock, raising and extending dikes and foreshore protection. 
Inner Harbor Navigation Canal to Bayou Bienvenue, 
is in a deferred status. The site for the lock 
remained the major problem. President Carter, as a 
result of his review of water resource projects in April 
1977, changed the site for the proposed shiplock to the 
Industrial Canal in Orleans Parish and recommended 
that, if justified, the existing lock should be replaced 
and expanded in place and that care should be taken 
to minimize dislocation of residents living adjacent to 
the site. These recommendations are being addressed 
in an Evaluation Report scheduled for completion in 
FY 1990. The foreshore protection, south bank, 
Chalmette Area, Station 367+00 to Station 1007+00 is 
complete. 
4. MISSISSIPPI RIVER 
SHIP CHANNEL, 
GULF TO BATON ROUGE, LA 
Location. The project is located in the southeastern 
portion of Louisiana below Baton Rouge, consisting of 
the Mississippi River and its outlets to the Gulf of 
Mexico. 
Existing project. Provides more efficient deep-draft 
navigation access to the New Orleans and Baton Rouge 
reaches of the Mississippi River via Southwest Pass 
by enlarging the existing channel to a project depth 
of 55 feet and enlarging the adjacent channel along 
the left descending bank in New Orleans Harbor to 
a 40-foot depth, a turning basin at Baton Rouge, and 
training works in the passes to reduce maintenance. 
Estimated cost of existing project (Oct. 1, 87) is 
$143,000,000 Federal and $344,000,000 non-Federal. 
In addition, Coast Guard is to provide navigation aids 
at an estimated cost of $3,027,000. 
Local cooperation. The cost sharing provisions contained 
in the Water Resources Development Act of 1986 
require that prior to initiation of construction, local 
interests, shall: (a) Provide to the Federal Government 
lands, easements, rights-of-way, and dredged material 
disposal areas, and perform the necessary relocations 
required for construction, operation and maintenance 
of the project; (b) Hold and save the United States free 
from damages due to the construction or operation and 
maintenance of the project except for damages due to 
the fault or negligence of the United States or its 
contractors; (c) Provide to the Federal Government, 
the non-Federal share of all other costs of construction 
of the project. These costs include 25 percent of the 
construction costs incurred for construction of the 
navigation channel to a depth of 45 feet, and 50 percent 
of the construction costs incurred for deepening the 
channel between 45 and 55 feet. In addition, the local 
sponsor shall repay the Government 10 percent of the 
construction costs over a 30-year period. The local 
sponsor may be permitted to include, toward sums to 
be reimbursed, all or part of the value of any lands, 
easements, rights-of-way, and dredged material disposal 
areas and relocations (other than utilities) contributed 
or expended by the non-Federal sponsor; (d) 
11-4

NEW ORLEANS, LA, DISTRICT 
Be responsible for 50 percent of the incremental maintenance 
below 45 feet on a channel depth greater than 
45 feet. 
A Local Cooperation Agreement (LCA) between the 
Government and the State of Louisiana was signed on 
June 30, 1986. A supplement to the LCA was signed 
on June 15, 1987, to comply with the cost sharing and 
financing concepts reflected in the Water Resources 
Development Act of 1986, Public Law 99-662. This 
agreement provides for the dredging of a 45-foot channel 
from the gulf to Mile 181.0 AHP. 
Terminal facilities. See Mississippi River, Baton 
Rouge to the Gulf of Mexico, LA. 
Operations and results during fiscal year. GDM 
Supplement No. 4 was completed in Dec. 1986. The 
GDM plan would eliminate the need for training works 
at Southwest Pass for the 45-foot channel. Construction 
was initiated on July 1, 1987, on the dredging of the 
channel to 45 feet from the Gulf to Mile 181.0 AHP. 
Two hopper dredge contracts were awarded from Mile 
21.0 BHP to the Gulf and Mile 18.8 BHP to Mile 21.0 
BHP. Two cutterhead dredging contracts were 
awarded for Mile 3.5 AHP to Mile 18.8 BHP. 
Condition as of Sep. 30. The dredging of Southwest 
Pass to 45 feet is completed from the Gulf to Mile 21.0 
BHP. Construction of the 45-foot channel is underway 
from Mile 18.8 BHP to 21.0 BHP and Mile 3.5 AHP 
to Mile 9.0 BHP. Completion is scheduled for Nov. 1987. 
This will provide a 45-foot channel to the Port of New 
Orleans. Studies are underway to determine the most 
economical plan to mitigate for saltwater intrusion 
caused by the deeper channel. Until these studies are 
complete, an interim plan has been developed that will 
provide for the barging of fresh raw water to three 
water treatment plants in Plaquemines Parish. The 
construction of mooring facilities for the barges at each 
of these plants is underway. 
5. WATERWAY FROM 
INTRACOASTAL WATERWAY 
TO BAYOU DULAC, LA 
(Bayous Grand Caillou and 
LeCarpe, LA) 
Location. Bayou LeCarpe is a tidal stream which 
rises about 1.5 miles southeast of Houma in Terrebonne 
Parish and flows southerly into Bayou Pelton, thence 
into Bayou Grand Caillou, which flows southwesterly 
into Caillou Bay, a total distance of about 40 miles. 
(Refer to Coast and Geodetic Survey Chart, No. 1116 
and Geological Survey maps of Houma, Dulac, Bayou 
DuLarge, and Dog Lake quadrangles.) 
Existing project. As modified, provides for a 10-' 
by 45-foot channel in Bayou LeCarpe from Gulf Intracoastal 
Waterway 2.6 miles to Houma navigation canal; 
a 5- by 40-foot channel through Bayou Pelton and Bayou 
Grand Caillou to Bayou Dulac, a distance of about 13.7 
miles. Between miles 2.6 and 5, this project coincides 
with or is adjacent to 15- by 150-foot Houma navigation 
canal. Normal range of tide is 3 to 10 inches; from 
winds, 1 to 3 feet. Cost of new work, completed in 
August 1964, was $129,662. 
Local cooperation. Requirements of local cooperation 
are fully described on page 11-5 of FY 1986 
Annual Report. 
Terminal facilities. Many terminal and transfer 
facilities are in Houma and along waterways which 
flow through area between Houma and Gulf of Mexico. 
All facilities are privately owned and operated. Facilities 
are adequate for existing commerce and for reasonably 
prospective commerce. Ample space exists for 
expansion of existing facilities or for construction of 
new wharves and appurtenances. 
Operations and results during fiscal year. Hired 
labor consisted of real estate activities, reconnaissance 
surveys, and water quality studies. One contract for 
maintenance dredging at Bayou LeCarpe was completed 
October 1986, included the removal of 65,217 
cubic yards at a cost of $359,800. 
Condition as of Sep. 30. The 5- by 40-foot channel 
was constructed from January 1938 to August 1938, 
and modification of October 23, 1962, for enlargement 
of 2.54 miles of Bayou LeCarpe to 10 feet by 45 feet 
was initiated in May and completed August 1964. 
6. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Sec. 107, Public 
Law 86-645, as amended (preauthorization.) 
Preauthorization studies costs as of Sep. 30, 1987, 
were $887,267 for Bayou Grand Caillou. 
Flood Control 
7. GRAND ISLE AND VICINITY, LA 
Location. In south Jefferson Parish, LA, along the 
Gulf of Mexico, about 50 miles south of New Orleans 
and 45 miles northwest of southwest pass (Mississippi 
River). 
Existing project. The project provides protection 
from waves driven by hurricanes that have a frequency 
of recurrence of up to once in every 50 years. The plan 
consists of a berm and vegetated dune extending the 
length of Grand Isle's gulf shore and a jetty to stabilize 
the western end of the island at Caminada Pass. The 
dune would have a 10-foot-wide crown at an elevation 
of 11.5 feet NGVD, 1 on 5 side slopes, and protective 
vegetation. The sandfill berm would slope from an 
elevation of 8.5 feet NGVD at the toe of the dune 180 
feet gulfward to an elevation of 3 feet NGVD and, from 
this point, would assume its natural slope to the offshore 
bottom. The jetty provided by the plan has a top width 
11-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
of 6 feet at an elevation of 4 feet mean sea level, 1 
on 2 side slopes, and extends approximately 3,600 feet 
along the western end of the island at Caminada Pass. 
Estimated cost of project (October 1987) is $17,587,000 
Federal and $10,980,000 non-Federal, including 
$6,419,000 contributed funds. 
Local cooperation. Local interests have the responsibility 
of providing rights-of-way, 30 percent of hurricane 
protection costs, 75 percent of beach erosion costs, 
and operation and maintenance of the completed work. 
The Louisiana Legislature, by Act 833 of 1982, authorized 
the Office of Public Works of the Louisiana 
Department of Transportation and Development to 
provide the non-Federal assurances for the Grand Isle 
Hurricane Protection and Beach erosion project. On 
Jan. 11, 1983, the Louisiana State Government authorized 
the Office of Public Works to execute the required 
assurances as a co-sponsor with the Town of Grand 
Isle. The required assurances were executed on March 
16, 1983, the construction rights-of-way were provided 
on May 4, 1983, and local interest provided a cash 
contribution of $2,100,000 on June 1, 1983, and $70,000 
in November 1985. An additional amount of $3,249,000 
will be required prior to project completion. The construction 
rights-of-way were provided on June 29, 1987. 
Maintenance of the project is the responsibility of the 
local assurer. The local assurer will receive Federal 
aid for repairing erosion and other damage to the 
project for a period of 15 years. The average annual 
Federal maintenance cost identified in the Act of 
Assurances is $44,000; however, this is not a fixed 
amount. Periodic nourishment to repair erosion will 
not necessarily be conducted every year, but as needed, 
with an estimated frequency of one in eight years on 
the average. It is estimated that the Federal share of 
the maintenance cost will be 25 percent for the 15- 
year period. 
Operations and results during the fiscal year. The 
repair and restoration of Grand Isle will be accomplished 
by two separate contracts. The jetty extensions 
and sand bar removal contract (partial fix) will consist 
of 500 feet extensions of the east and west jetties, 
removal of about 408,000 cubic yards of sand from the 
cuspate bar, and placement of the excavated sand on 
the eroded beach in the East End State Park. The dune 
repair and structural reinforcement contract (total fix) 
will accomplish all additional items of work necessary 
to fully restore the project, including the placement 
of one million plus cubic yards of sand to reconstruct 
the beach and dune, construction of offshore breakwaters, 
placement of a clay core in portions of the dune, 
and restoration of vehicular ramps, pedestrian crossovers 
and dune vegetation. The partial fix contract 
was awarded Sep. 16, 1987. 
Condition as of Sep. 30. The project is 80 percent 
complete. Partial fix contract was awarded Sep. 16, 
1987. 
8. LAKE PONTCHARTRAIN AND 
VICINITY, LA 
(HURRICANE PROTECTION) 
Location. In southeastern Louisiana, vicinity of New 
Orleans, in St. Charles, Jefferson, Orleans, St. Bernard, 
and St. Tammany Parishes, comprising lower land and 
water area between Mississippi River alluvial ridge 
and the Pleistocene escarpment to north and west. The 
dominant topographic feature is Lake Pontchartrain, 
a shallow landlocked tidal basin, about 640 square 
miles in area and averaging 12 feet deep, connecting 
with lesser Lake Maurepas to the west and through 
Lake Borgne and Mississippi Sound to the gulf to the 
east. The lake drains about 4,700 square miles of 
tributary area. (Refer to Geological Survey quadrangles 
Yscloskey and Malheureaux Point, Drum Bay, 
Door Point, Lake Eugenie, Oak Mound Bayou, Mitchell 
Keys, Lake Eloi, and Morgan Harbor; Engineer quadrangles 
Slidell, Covington, Ponchatoula, Springfield, 
Denham Springs, Donaldsonville, Mt. Airy, Bonnet 
Carre', Spanish Fort, Chef Menteur, Rigolets, St. Bernard, 
New Orleans, and Hahnville; and Coast and 
Geodetic Survey Charts No. 1115 and 1116. 
Existing project. Provides protection to the greatel 
New Orleans area and other communities bordering 
Lake Pontchartrain from the effects of hurricanegenerated 
floods. The project is comprised of two major 
features: The Chalmette Area Plan and the High Level 
Plan. The Chalmette Area Plan consists of a levee and 
floodwall system around the Chalmette area and along 
the Mississippi River Gulf Outlet, with connections to 
the Mississippi River levees. The High Level Plan will 
provide for heightening and strengthening the existing 
hurricane protection levee systems in Orleans Parish 
and the east bank of Jefferson Parish, repairing and 
rehabilitating the Mandeville Seawall in St. Tammany 
Parish; building a new mainline hurricane levee on 
the east bank of the St. Charles Parish just north of 
US Highway 61 (Airline Highway); raising and 
strengthening the existing levee which extends along 
the Jefferson-St. Charles Parish boundary between 
Lake Pontchartrain and Airline Highway; and deferring 
construction of the proposed Seabrook lock until 
its feasibility as a feature of the Mississippi River Gulf 
Outlet navigation project can be determined. Areas 
which will be enclosed by the levee and floodwall 
construction will be provided protection against tidal 
surge resulting from the Standard Project Hurricane 
(SPH). The estimated project cost for work (October 
1987) is $486,000,000 Federal and $208,000,000 non- 
Federal. 
Local cooperation. Provide all rights-of-way; bear 
30 percent of the first cost, consisting of fair market 
value of providing all lands, easements, and rightsof-
way, including borrow and spoil disposal areas for 
construction, accomplish alteration and relocation of 
roads, railroads, pipelines, cables, wharves, drainage 
structures, and other facilities; maintain and operate 
all works after completion; and hold and save the 
United States free from damages. See H. Doc. No. 231, 
11-6

NEW ORLEANS, LA, DISTRICT 
89th Cong., 1st sess. for more detailed requirements 
of local cooperation. 
Assuring Agency: The Orleans Levee District, Lake 
Borgne Basin Levee District, St. Bernard Parish Police 
Jury, Louisiana Office of Public Works, and Pontchartrain 
Levee District. The State of Louisiana formed 
the Jefferson Levee District and assigned to it the 
Jefferson Parish levees, previously the responsibility 
of the Pontchartrain Levee District. Basic assurances 
were received from the following: Orleans Levee District 
for the entire barrier plan and that portion of 
the Chalmette area plan in Orleans Parish; Pontchartrain 
Levee District for the barrier plan; Lake Borgne 
Levee District and St. Bernard Parish Police Jury for 
the Chalmette area plan in St. Bernard Parish. Supplemental 
assurances covering Public Law 91-646 have 
been received from the Orleans Levee District and the 
Pontchartrain Levee District. Lake Borgne Basin 
Levee District, St. Bernard Parish Police Jury, and 
the East Jefferson Levee District. The St. Tammany 
Parish portion of the project has been placed in an 
inactive status since the local sponsors have not provided 
acceptable assurances. Supplemental Assurances 
in connection with the High Level Plan were 
executed by the Orleans Levee District on May 29, 1985, 
and approved by the United States June 21, 1985. 
Supplemental Assurances for the High Level Plan were 
executed by the East Jefferson Levee District for the 
Jefferson Parish portion of the project on Jan. 16, 1987. 
Supplemental Assurances for the High Level Plan were 
executed by the Pontchartrain Levee District for the 
St. Charles Parish portion of the project on Apr. 20, 
1987, and accepted on behalf of the United States on 
Aug. 7, 1987. Supplemental Assurances for the High 
Level Plan are not required from St. Bernard Parish 
Police Jury and the Lake Borgne Basin Levee District 
for St. Bernard Parish. 
Operations and results during fiscal year. Preparation 
of design memorandums and plans and specifications 
continued by hired labor. Preparation of seven 
design memorandums are underway. Three are scheduled 
for completion in FY 88, two in FY 89 and two 
in FY 90. 
A Draft Reevaluation Report (including Draft Environmental 
Impact Statement) recommending the 
tentatively selected high level plan (lieu of Barrier 
Plan) was submitted by New Orleans District to the 
Lower Mississippi Valley Division in December 1983. 
The final Reevaluation Report was submitted to LMVD 
on Aug. 8, 1984. A Record of Decision was signed in 
February 1985 by the Office, Chief of Engineers. 
The final Environmental Impact Statement was filed 
with the Council on Environmental Quality on Jan. 
17, 1975. By Court Order dated Dec. 30, 1977, a revised 
Environmental Impact Statement was ordered. A draft 
revised Environmental Impact Statement for the High 
Level Plan and reevaluation report which documents 
the proposal to adopt that plan instead of the barrier 
plan was released to the public and filed with the 
Environmental Protection Agency on Dec. 16, 1983. 
The final revised Environmental Impact Statement 
was filed with the Environmental Protection Agency 
on Dec. 7, 1984. 
A draft mitigation report with corresponding EIS 
is currently being prepared. A series of public meetings 
and workshops were held to facilitate participation in 
mitigation plan formulation by other agencies, environmental 
groups, local sponsors, and other interested 
groups. Prior to selecting the tentative plan, the three 
final plans were presented to the public at a meeting 
on Jul. 29, 1985. 
Condition as of Sep. 30. Construction started May 
1967 and is 76 percent complete. 
Contract work continued on eight contracts. Plans 
and specifications are underway on six contracts scheduled 
for award in FY 1988. 
9. LAROSE TO GOLDEN MEADOW, 
LA (HURRICANE PROTECTION) 
Location. In coastal section of Louisiana, along 
Bayou Lafourche, and includes lands on both banks 
of the bayou from Larose to 2 miles south of Golden 
Meadow. (Refer to Geological survey quadrangles Cutoff, 
Lke Felicity, Bay Dosgris, Golden Meadow Farms, 
Bay Tambour, Mink Bayou, Caminada Pass, Leeville, 
Belle Pass, Pelican Pass, and Calumet Island; Engineer 
quadrangles New Orleans, Hahnville, Point-a-la- 
Hache, Barataria, and Fort Livingston; and Coast and 
Geodetic Survey Charts Nos. 1115 and 1116 
Existing project. Provides a loop levee about 40 miles 
long along both banks of Bayou Lafourche from Larose 
to South Golden Meadow; enlargement of 3 miles of 
existing levee at Golden Meadow; floodgates for navigation 
and hurricane protection in Bayou Lafourche at 
upper and lower bayou crossings; about 8 miles of low 
interior levees to regulate intercepted drainage. Estimated 
cost for new work (October 1987) is $69,400,000 
Federal and $29,700,000 non-Federal. 
Local cooperation. Provide without cost to the United 
States all lands, easements, and rights-of-way, 
including borrow areas and spoil disposal areas, and 
accomplish alterations to roads, pipelines, cables, 
wharves, oil wells, and any other facilities necessary 
for the construction of the project; all at an estimated 
cost of $14,050,000; bear 30 percent of the total project 
cost, a sum presently estimated at $29,700,000 consisting 
of the items listed above, and a cash contribution 
presently estimated at $15,695,000 or equivalent work 
specifically undertaken as an integral part of the 
project after authorization and in accordance with 
construction schedules as required by the Chief of 
Engineers; hold and save the United States free from 
damages due to the construction works; maintain and 
operate all the works after completion in accordance 
with regulations prescribed by the Secretary of the 
Army; and prevent any encroachment on ponding areas 
unless substitute storage capacity or equivalent pumping 
capacity is provided promptly without cost to the 
11-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
United States; comply with the provisions of the Uniform 
Relocations Assistance and Real Property Acquisition 
Policies Act of 1970 (Public Law 91-646) and 
with the provisions of Section 221 of the Flood Control 
Act of 1970 (Public Law 91-611) in acquiring real 
property. 
The Board of Commissioners of the South Louisiana 
Tidal Water Control Levee District executed the 
required Agreement of Local Cooperation on Nov. 13, 
1972, which was executed by the United States on Jul. 
10, 1973 and approved on behalf of the Secretary of 
the Army on Aug. 29, 1973. Section 38, Paragraph 1051 
et seq., Louisiana Revised Statutes created the South 
Lafourche Levee District. The South Lafourche Levee 
District assumed the rights and obligations of the South 
Louisiana Tidal Water Control Levee District with 
respect to this project. Local interests have requested 
and received funds from the State of Louisiana for 
right-of-way acquisition and relocations required to 
support construction work. 
Operations and results during fiscal year. Work 
continued on design memorandums and plans and 
specifications by hired labor forces. Four contracts 
were awarded and plans and specifications are underway 
on two contracts scheduled for award in FY 1988. 
Condition as of Sep. 30. Construction commenced 
in February 1975 and is 56 percent complete. 
10. MORGAN CITY AND 
VICINITY, LA 
(HURRICANE PROTECTION) 
Location. In south-central Louisiana, Morgan City 
proper, and the adjacent areas. It includes the land 
south of Grand Lake, Six Mile Lake, and Lake Palourde 
extending from Morgan City westward to Charenton 
drainage and navigation canal. Lower Atchafalaya 
River and Wax Lake Outlet, the principal outlets for 
Atchafalaya Basin Floodway, traverse the area. Gulf 
Intracoastal Waterway crosses the area in an east-west 
direction. Numerous bayous and artificial canals excavated 
for drainage purposes or for access to oil developments 
exist throughout the area. (See Engineer 
quadrangles Bayou Sale, Jeanerette, Foster, Belle Isle, 
Point Au Fer, Morgan City, and Lake Decade; and 
Coast and Geodetic Survey Chart 1116.) 
Existing project. Morgan City: Construction of 
about 5.6 miles of new levees along shore of Lake 
Palourde and west bank of Bayou Ramos and about 
0.5 mile of new levee from Southern Pacific railroad 
embankment near Wyandotte to tie in with Bayou 
Boeuf lock levee, and construction of three gravity 
drainage structures. 
Franklin and vicinity: Enlargement of about 21.6 
miles of back levee and construction of about 3.5 miles 
of new levees to effect a complete closure of area to 
be protected, construction of one floodgate and eight 
gravity drainage structures, and alteration of existing 
drainage facilities where necessary. Normal range of 
tide is 1.6 feet. Storm and hurricane tide have produced 
elevations up to 10 feet while northerly storms 
during winter depress the gulf level as much as 3 feet 
below mean sea level. During low water periods on 
Atchafalaya River, generally September through 
November, the effect of tide extends about 35 miles 
above Morgan City. 
Local cooperation. For details see page 11-8 of the 
FY 1986 Annual Report. 
Operations and results during period. The GDM 
for the Morgan City area was completed in FY 1985. 
Condition as of Sep. 30. Due to lack of financial 
local support this project has been moved to a defererd 
status. 
11. NEW ORLEANS TO VENICE, LA, 
HURRICANE PROTECTION 
Location. Includes land subject to inundation by 
hurricane tides extending along both banks of the 
Mississippi River below New Orleans from vicinity of 
Phoenix to Venice, LA. 
Existing project. Provides for improvements along 
Mississippi River below New Orleans, LA, for prevention 
of hurricane tidal flood damages by increasing 
heights of existing back levees and modifying existing 
drainage facilities where necessary in three separate 
reaches: Reach A, on the west bank from City Price 
to Empire, 15 miles, 4,340 acres protected; Reach B, 
on the west bank from Empire to Venice, 21 miles, 
4,900 acres protected; and Reach C, on the east bank 
from Phoenix to Bohemia (construction recently completed 
by local agency with credit given as equivalent 
work), 16 miles, 5,470 acres protected, and raising the 
river levee on the west bank (MR&T levee) from City 
Price to Venice, to a grade high enough to prevent 
over topping by tidal surges from the east, generally 
called the West Bank River Plan. Reach B was later 
divided into two units, Reach B-1 from Empire to Fort 
Jackson and Reach B-2 from Fort Jackson to Venice, 
LA, as a result of a request made by the local agency. 
Estimated cost of new work (October 1987) is 
$225,000,000 Federal and $96,000,000 non-Federal, 
including $76,050,000 cash contributions or equivalent 
work. 
Local cooperation. Provide all lands, easements and 
rights-of-way including borrow areas and spoil disposal 
areas necessary for the construction of the project, at 
costs presently estimated at $7,473,000; accomplish all 
necessary alterations and relocations to roads, pipelines, 
cables, wharves and other facilities required by 
the construction of the project at costs presently estimated 
at $12,477,000; bear 30 percent of the first cost, 
a sum presently estimated at $96,000,000, and cash 
contribution presently estimated at $76,050,000 to be 
paid either in a lump sum prior to initiation of construction 
or in installments prior to start of pertinent 
work items, in accordance with construction schedules 
11-8

NEW ORLEANS, LA, DISTRICT 
as required by the Chief of Engineers, or as a substitute 
for any part of the cash contribution, accomplish in 
accordance with approved construction schedules 
items of work of equivalent value as determined by 
the Chief of Engineers, the final apportionment of costs 
to be made after actual costs and values have been 
determined; hold and save the United States free from 
damages due to the construction works; maintain and 
operate all works after completion in accordance with 
regulations prescribed by the Secretary of the Army; 
prevent any encroachment on ponding areas unless 
substitute storage capacity or equivalent pumping is 
provided promptly; and at least annually, notify those 
affected that the project will not provide complete 
protection from tidal flooding and that further local 
actions must be taken during hurricane emergencies. 
Local interests are also required to comply with the 
provisions of the Uniform Relocation Assistance and 
Real Property Acquisition Policies Act of 1970 (PL 91- 
646), in acquiring real property. 
PL 91-611. Not applicable. Construction started prior 
to Jan. 1, 1972. 
PL 91-646. A constitutional amendment was provided 
by the Louisiana legislature on Feb. 1, 1972 
allowing local interests to comply. The estimated cost 
to local interests is $48,000. 
Assurances of local cooperation for Reaches A, B- 
1, B-2 and C, furnished by the Plaquemines Parish 
Commission Council were accepted on behalf of the 
United States on Apr. 14, 1965. Supplemental assurances 
covering provisions of the Uniform Relocations 
Assistance and Real Property Acquisition Policies Act 
of 1970, Public Law 91-646, furnished by the Plaquemines 
Parish Commission Council were accepted on 
behalf of the United States on Jun. 20, 1973. Local 
interests were requested to furnish separate assurances 
for the East Bank Barrier Levee on Jun. 10, 1975, Feb. 
23, 1976, and again on Aug. 19, 1983. By letter dated 
Feb. 5, 1985, the local sponsor requested the Corps of 
Engineers to defer further work on the design of Reach 
A and direct their efforts toward earliest possible 
construction of the East Bank Barrier Levee or a 
suitable alternative thereto. The Corps, with the concurrence 
of the local sponsor, has selected a West Bank 
Levee alternative to the East Bank Barrier. The local 
sponsor has indicated their willingness to provide the 
supplemental of local cooperation for the West Bank 
River Levee. A Local Cooperation Agreement was 
submitted to the local sponsor on Aug. 25, 1987, and 
a response is anticipated in the near future. By letter 
dated Jul. 28, 1987, the local sponsor also requested 
the Corps of Engineers to advance construction on 
Reach A, based on the results of the geotextile test 
section. 
All negotiations for relocations are the responsibility 
of local interests. These mainly consist of raising several 
petroleum and natural gas pipelines to the levee 
configuration and relocation of privately owned frame 
structures used as fishing and boating camps. To assure 
that there will be no delay in construction of levees, 
local interests are notified well in advance so that the 
owners of the pipelines can be advised. 
Assuring Agency: Plaquemines Parish Commission 
Council. Assurances for all reaches of the project, 
except the East Bank Barrier levee, have been 
furnished. 
Operations and results during fiscal year. A GDM 
recommending the West Bank River Levee in lieu of 
the East Bank Barrier Levee was completed and 
submitted to LMVD on Mar. 26, 1987. Plans and 
specifications for segments of Reaches A. B-1, B-2, C 
and West Bank River Levee were initiated and are 
continuing. 
Construction during FY 87 was initiated on two 
contracts and continued on three others. Plans and 
specifications were initiated on four construction items 
scheduled for award in FY 88. 
The final Environmental Impact Statement was filed 
with the Council on Environmental Quality on Jan. 
24,1975; however, during subsequent review, it became 
apparent that the final Environmental Impact Statement 
was deficient. A draft Environmental Impact 
Statement supplement was submitted to the Environmental 
Protection Agency on Mar. 23, 1984, and the 
final Environmental Impact Statement supplement 
with a Section 404 evaluation was filed with the 
Environmental Protection Agency on Apr. 12, 1985. 
A draft Supplemental Environmental Impact Statement 
(Supplement 11) for work on the West Bank River 
Levee was submitted to the Environmental Protection 
Agency on Aug. 5, 1987, and the final is scheduled 
for submittal in November 1987. 
The levee on the west bank from Tropical Bend to 
Venice would impact about 14,000 acres of which 
approximately 9,000 acres are marsh and 4,000 acres 
are shallow open waters. Although most of these 
impacts are temporary, about 1,000 acres of marsh 
would be permanently lost. To compensate for this loss, 
a mitigation plan has been formulated which would 
result in the creation of natural marsh on the Delta- 
Breton National Wildlife Refuge. 
Condition as of Sep. 30. Construction began on the 
project in September 1968 and the total project is 
approximately 37 percent complete. 
12. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Various hurricane protection projects, as well as 
small flood control projects, were inspected during FY 
1986. Also, periodic inspection and continuing evaluation 
of completed civil works structures was conducted 
in accordance with ER 1110-2-100, at various 
times during the year on an as-needed basis. 
Fiscal year costs for the period were $267,079. Total 
costs to Sep. 30, 1987, were $2,226,906. 
11-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
13. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Disaster preparedness, FY costs for the period were 
$161,450. Emergency Operations: Total costs to Sep. 
30, 1987 were $898,829. Rehabilitation costs for FY 
87 was $204. 
11-10

NEW ORLEANS, LA, DISTRICT 
TABLE 11-A COST AND FINANCIAL STATEMENT 
See 
Section Total Funds to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
1. Leland Bowman 
Lock, LA 
(Replacement 
of lock) 
2. Mississippi 
River, Baton 
Rouge to the 
Gulf of 
Mexico, LA 
3. Mississippi 
River-Gulf 
Outlet, LA 
(Regular Funds) 
(Contrib. Funds) 
4. Mississippi 
River Ship 
Channel-Gulf 
to Baton Rouge 
(Contrib. Funds) 
5. Waterway from 
Intracoastal 
Waterways to 
Bayou Dulac, 
LA (Bayou 
Grand Caillou & 
LeCarpe, LA) 
7. Grand Isle 
and Vicinity, 
LA 
(Contrib. Funds) 
8. Lake Pontchartrain 
and vicinity, 
LA (Hurricane 
Protection) (Regular 
Funds) 
(Contrib. Funds) 
9. Larose to Golden 
Meadow, LA 
Hurricane 
Protection) 
(Contrib. Funds) 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
$ 10,325,000 
8,341,621 2,578,556 447,155 280,357 
800,000 4,000,000 13,251,000 20,110,000 
878,037 1,192,445 16,022,664 15,429,842 
48,510,600 39,039,920 24,957,067 25,153,650 
47,713,135 41,229,463 25,630,318 25,117,781 
500,000 
1,664,718 
9,705,000 
10,169,620 
2,200,000 
1,286,205 
4,429,000 
4,515,392 
121,500 
77,500 
696,000 
6,933,000 
7,684,892 
6,663,500 
6,808,104 
594,000 
691,278 
8,340,000 
8,373,119 
631,000 3,730,000 
1,074,000 3,591,928 
- - - 1,070,453 
- - - 1,396,000 
1,423,000 2,832,000 1,240,276 849,700 
1,394,421 2,881,422 1,239,090 861,475 
40,000 
43,223 
4,161,000 
6,714,791 
2,110,000 
2,000,000 
228,000 
177,151 
-21,000 
-21,000 
432,000 
653,469 
100,000 
100,000 
56,395 532 
31,470 376,800 
30,669 377,601 
1,000,000 
735,330 
70,000 
70,000 
961,000 
42,691 
368,000 
8,800,000 11,158,000 20,358,000 13,375,000 
7,937,422 10,382,763 21,676,920 13,331,227 
325,000 
260,000 
195,000 
260,000 
510,988 
1,102,053 
281,518 
34,518 
5,700,000 5,865,000 4,221,000 4,813,000 
6,901,800 7,441,971 4,073,880 5,018,844 
182,000 
182,000 
250,000 
234,087 
$ 32,200,0101 
32,177,3331 
78,272,7972 
75,054,3942 
493,157,5613,5 
492,750,1634" 
88,867,200 
88,758,260 
110,654,080 
110,612,047 
1,240,4776 
1,196,4776 
9,074,000 
5,274,000 
1,070,453 
1,396,000 
10,740,776 
10,732,538 
637,622 
641,608 
1,276,032 
1,276,032 
10,303,500 
9,048,371 
2,648,000 
2,170,000 
194,971,000 
193,408,775 
4,602,690 
4,988,247 
47,001,000 
45,773,449 
2,521,721 
2,477,355 
11-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 11-A 
(Continued) 
COST AND FINANCIAL STATEMENT 
See 
Section Total Funds to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
10. Morgan City and New Work 
vicinity, LA Approp. 387,000 280,000 -79,000 - 1,953,000 
(Hurricane Cost 367,606 221,260 21,762 - 1,975,628 
Protection) 
11. Mississippi New Work 
River Delta at Approp. 2,830,000 1,920,000 971,000 4,908,000 59,268,000 
and below New Cost 3,581,564 1,630,947 1,449,660 4,546,692 58,866,809 
Orleans, LA (New 
Orleans to Venice, 
LA, Hurricane 
Protection) (Regular 
Funds) 
(Contrib. Funds) New Work 
Contrib. - - 1,368,989 340,000 5,125,419 
Cost 450,000 - 984,106 724,883 5,125,419 
1. Includes AE&D funds for replacement of Vermilion 
Lock. 
2. Includes $1,729,989 for previous project. 
3. Does not include allotment of $40,000 (9613123). 
4. Does not include expenditures of $63,370 (9613123). 
5. Includes $169,055 for previous projects and $3,379,676 
from permanent indefinite appropriation. 
6. Contributed by Board of Commissioners, Port of New 
Orleans, for providing fill for future industrial sites adjacent 
to turning basin and for dredging cable and pipeline 
crossings. 
11-12

NEW ORLEANS, LA, DISTRICT 
TABLE 11-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Water 
Resources 
Development 
Act, 1986 
WRD Act of 
1976, dated 
Oct. 22, 1976 
(PL 94-587) 
Mar. 2, 1945 
Oct. 23, 1962 
Mar. 29, 1956 
Oct. 22, 1976 
Water 
Resources 
Development 
Act, 1986 
Approp. Act of 
1985, dated 
Jul. 2, 1986 
(PL 99-88) 
LAKE CHARLES, LA 
The project for deepening of the project for navigation, Lake 
Charles, Louisiana, to a depth of 45 feet, at a total cost of 
$1,070,000. 
LELAND BOWMAN LOCK LA (REPLACEMENT OF 
LOCK) (FORMERLY VERMILION LOCK) (See Sec. 1 of 
Text) 
A replacement lock, 110 feet wide and 1,200 feet long, to accommodate 
present and projected marine traffic. 
MISSISSIPPI RIVER, BATON ROUGE TO GULF OF 
MEXICO, LA (See Sec. 2 of Text) 
Combines projects of Mississippi River, Baton Rouge to New 
Orleans, Mississippi River, South Pass, and Southwest Pass, 
adding thereto project for Mississippi River from New Orleans 
to Head of Passes, to provide a single project, "Mississippi 
River, Baton Rouge to the Gulf of Mexico," with channel 
dimensions as follows: Baton Rouge to New Orleans, 35 by 500 
feet; port limits of New Orleans, 35 by 1,500 feet; New Orleans 
to Head of Passes, 40 by 1,000 feet, Southwest Pass, 40 by 800 
feet; Southwest Pass Bar Channel, 40 by 600 feet; South Pass, 
30 by 450 feet; South Pass Bar Channel 30 by 600 feet. 
Deepen existing channel from 35 to 40 feet by 500 feet wide 
from one-tenth mile below Louisiana Highway Commission 
bridge at Baton Rouge to upper limits of Port of New Orleans, 
and also 40 by 500 feet within presently authorized 35- by 
1,500-foot channel in port limits of New Orleans. 
MISSISSIPPI RIVER-GULF OUTLET, LA (See Sec. 3 of 
Text) 
Construct a seaway canal 36 feet deep and 500 feet wide from 
Michoud to 38-foot contour in gulf and an inner tidewater harbor 
consisting of a 1,000- by 2,000-foot turning basin 36 feet 
deep and a connecting channel 36 feet deep and 500 feet wide 
to Inner Harbor Navigation Canal and provides, when economically 
justified, for construction of a lock to Mississippi River in 
the vicinity of Meraux, LA. 
Amends above Act making the construction of bridge relocations 
a Federal responsibility when required by the construction 
of the Mississippi River-Gulf Outlet channel. 
The Mississippi River-Gulf Outlet feature is modified to provide 
that the replacement and expansion of the existing industrial 
canal lock and connecting channels or the construction of an 
additional lock and connecting channels shall be in the area of 
the existing lock or at the Violet site. 
MISSISSIPPI RIVER SHIP CHANNEL, GULF TO 
BATON ROUGE, LA (See Sec. 4 of Text) 
Will provide more efficient deep-draft navigation access to the 
New Orleans and Baton Rouge reaches of the Mississippi River 
via Southwest Pass by enlarging the existing channel to a project 
depth of 55 feet and enlarging the adjacent channel along 
the left descending bank in New Orleans Harbor to a 40-foot 
depth, a turning basin at Baton Rouge, and training works in 
the passes to reduce maintenance. 
Public Law 99-662, Nov. 17, 
1986. 
Approved by Secretary of 
the Army, May 1967, 
under authority of the 
R&H Act of 1909. 
H. Doc. 215, 76th Cong.. 1st 
sess.1 
S. Doc. 36, 87th Cong., 1st 
sess. 
H. Doc. 245, 82d Cong., 1st 
sess. 
Sec. 186, Water Resources 
Development Act of 1976 
(PL 94-587 2d sess. 
Public Law 99-662, Nov. 17, 
1986. 
H. Doc. 2577, 99th Cong., 
1st sess. 
11-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 11-B 
(CONTINUED) 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Nov. 17, 1986 
(PL 99-662) 
Aug. 30, 1935 
Oct. 23, 1962 
Water 
Resources 
Development 
Act, 1986 
Adopted by 
Committee 
Resolutions 
Sep. 23, 1976, 
and Oct. 1, 
19762 
Oct. 27, 1965 
Water 
Resources 
Development 
Act, 1986 
Oct. 27, 1965 
Oct. 27, 1965 
Formalizes the cost sharing provisions of the project, permits 
the State of Louisiana to enact user fees to defray their portion 
of the project costs, and implements harbor maintenance fees 
to help pay for the Federal cost of the project. It also provides 
an option to the local sponsor to defer their initial payment for 
one year following initiation of construction. In terms of channel 
depths up to 45 feet, the cost sharing requirements are 75 
percent Federal and 25 percent non-Federal for construction 
and 100 percent Federal for maintenance. For channels deeper 
than 45 feet, the cost sharing requirements are 50 percent Federal 
and 50 percent non-Federal for both construction and 
maintenance. 
WATERWAY FROM INTRACOASTAL WATERWAY TO 
BAYOU DULAC, LA (Bayous Grand Caillou and LeCarpe, 
LA) (See Sec. 5 of Text) 
Channel 5 by 40 feet from Intracoastal Waterway at Houma 
through Bayou LeCarpe, Bayou Pelton, and Bayou Grand Caillou 
to Bayou Dulac, about 16,3 miles. 
Channel 10 by 45 feet in Bayou LeCarpe from Gulf Intracoastal 
Waterway to Houma navigation canal. 
BAYOU RIGOLETTE, LA 
A project to construct six additional floodgates at Bayou 
igolette, LA, adjacent to the existing drainage structure, at a 
total cost of $2,300,000. 
GRAND ISLE AND VICINITY, LA (See Sec. 7 of Text) 
To provide hurricane protection by placement of a berm and 
vegetated dune extending the length of Grand Isle's gulf shore 
and a jetty to stabilize the western end of the island at 
Caminada Pass. 
LAKE PONTCHARTRAIN AND VICINITY, LA 
(HURRICANE PROTECTION) (See. Sec. 8 of Text) 
Control of hurricane tides by construction of two independent 
units, the Lake Pontchartrain Barrier plan and the Chalmette 
Area plan. 
LAKE PONTCHARTRAIN, NORTH SHORE, LA 
The project for navigation, Lake Pontchartrain North Shore, 
LA: Report of the Chief of Engineers, dated February 14, 1979, 
at a total cost of $1,310,000, with an estimated first Federal 
cost of $655,000 and an estimated first non-Federal cost of 
$655,000. 
LAROSE TO GOLDEN MEADOW, LA (HURRICANE 
PROTECTION) (See Sec. 9 of Text) 
A loop levee about 36 miles long along both banks of Bayou 
Lafourche from Golden Meadow to Larose; enlargement of 3 
miles of existing levee at Golden Meadow; floodgates for navigation 
and hurricane protection in Bayou Lafourche at upper 
and lower bayou crossings; about 8 miles of low interior levees 
to regulate intercepted drainage; and seven multibarreled culverts 
controlled by flapgates. 
MORGAN CITY AND VICINITY, LA, HURRICANE 
PROTECTION (See Sec. 10 of Text) 
Construction of new levees along Lake Palourde and Bayou 
Ramos, levee to tie-in with Bayou Boeuf lock levee and three 
gravity drainage structures in Morgan City unit and enlargement 
of bank levee, construction of new levee, and construction 
of one floodgate and five gravity drainage structures in Franklin 
and vicinity unit. 
WRDA of 1986, 99th Cong., 
2d sess. 
H. Doc. 206, 72d Cong., 1st 
sess. 
Public Law 99-662, Nov. 17, 
1986. 
H. Doc. 639, 94th Cong., 2d 
sess. 
H. Doc. 231, 89th Cong., 1st 
sess. 
Public Law 99-662, Nov. 17, 
1986. 
H. Doc. 184, 89th Cong., 1st 
sess.i 
H. Doc. 167, 89th Cong., 1st 
sess. 
11-14

NEW ORLEANS, LA, DISTRICT 
TABLE 11-B 
(CONTINUED) 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
NEW ORLEANS TO VENICE, LA HURRICANE 
PROTECTION (See Sec. 11 of Text) 
Oct. 23, 1962 Improvements along Mississippi River below New Orleans, LA, H. Doc. 550, 87th Cong., 2d 
for prevention of hurricane tidal flood damages by increasing sess. 
heights of existing back levees and modifying existing drainage 
facilities where necessary in five separate reaches. 
WEST BANK HURRICANE PROTECTION LEVEE, 
JEFFERSON PARISH, LA 
Water Structural and nonstructural measures to prevent flood damage Public Law 99-662, Nov. 17, 
Resources to those areas identified in the Feb. 1984 draft Environmental 1986. 
Development Impact Statement for the West Bank Hurricane Protection 
Act, 1986 Levee, Jefferson Parish, LA, at a total cost of $61,500,000, with 
an estimated first Federal cost of $40,000,000 and an estimated 
first non-Federal cost of $21,500,000. Funds provided by non- 
Federal interest for interim hurricane protection may be considered 
beneficial expenditures and may be credited as part of 
the non-Federal contribution of the project pursuant to Section 
104 of this Act. 
1. Contains latest published map. 
2. Permanent Appropriation Repeal Act. 
11-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 11-C OTHER AUTHORIZED NAVIGATION PROJECTS 
Cost to Sep. 1987 
For Last Mo. and Yr. 
Full Report Operation Completed 
See Annual and Deauthorized 
Project Status Report For: Construction Maintenance or Reclassified 
Alteration of Berwick Bay Bridge1 
Amite River and Bayou Manchac, LA 
Aquatic Plant Control Program, LA 
Atchafalaya River Bayous Chene 
Boeuf, and Black, LA 
Atchafalaya River, Morgan City to Gulf 
of Mexico, LA 
Baton Rouge Harbor, 
Segment between Mi. 2.5 and 5.02 
Barataria Bay Water, LA 
Bayou Bonfouca, LA 
Bayou Dorcheat, Loggy Bayou and 
Lake Bisteneau, LA '", 6 
Bayou Dupre, LA7 
Bayou Grosse Tete, LA8 
Bayou Lacombe, LA 
Bayou Lafourche and Lafourche Jump 
Waterway, LA 
Bayou La Lautre, St. Malo, and 
Yscolskey, LA 
Bayou Plaquemine Brule, LA 
Bayou Queue de Tortue, LA 
Bayou Segnette Waterway, LA 
Bayou Teche, LA 
Bayou Teche & Vermilion River, LA 
Bayou Terrebonne, LA4,9 
Bayou Vermilion, LA4 
Big Pigeon and Little Pigeon 
Bayous, LA3 
Calcasieu River and Pass, LA 
Calcasieu River at Coon Island, LA1o 
Calcasieu River at 
Devil's Elbow, LA 
Cascasieu River Salt Water 
Barrier, LA11 
Cane River, LA3,6 
Chefuncte River and Bogue Falia, LA 
Cypress Bayou and Waterway between 
Jefferson, TX, and Shreveport, LA12 
Freshwater Bayou, LA 
Grand Bayou Pass, LA 
Gulf Intracoastal Waterway 
between Apalachee Bay, FL & 
Mexican Border 
Houma Navigation Canal, LA 
Inland Waterway from Franklin 
to Mermentau River, LA" 3 
Intracoastal Waterway from the 
Mississippi River to 
Bayou Teche, LA14 
Lake Borgne and Chef Menteur- 
Bulkheads and Jetties 
Lake Charles Deep Water Channel, 
LA15 
Little Caillou Bayou, LA 
Complete 
Complete 
Complete 
Complete 
Deauthorized 
Complete 
Complete 
Complete 
Deauthorized 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
1967 
1978 
1984 
1984 
1981 
19462 
1984 
1974 
1887 
1968 
1967 
1984 
1970 
1950 
1970 
1958 
1984 
1983 
1961 
1947 
1936 
1984 
1976 
1981 
1973 
1910 
1967 
1971 
1984 
1950 
1985 
1984 
1960 
1956 
19422 
1950 
1973 
$ - 
28,234 
12,687,204 
69,087 
69,087 1928 
30,354,630 44,568,522 
501,963 
1,572,685 
30,997 
5,000 
38,915 
1969 
4,716 
1,624,424 
96,916 
33,410 
33,355 
238,828 
754,330 
2,891,822 
120,089 
34,900 
27,807,310 
1,015,81410 
5,856,200 
4,197,262 
2,500 
58,342 
202,817 
7,116,224 
7,676 
20,008,457 
320,758 
104,1877 
123,454 
119,191 
829,756 
223,616 
36,780 
28,315 
239,717 
4,897,347 
1,668,036 
251,691 
200,169 
37,169 
101,758,663 
2,000 
463,401 
452,611 
16,278,840 
14,48012 
1914 
Nov. 1979 
Nov. 1963 
1931 
1939 
May 1981 
1938 
May 1956 
1915 
March 1923 
March 1957 
1916 
1896 
3 
Oct. 1968 
April 1974 
Sep. 1978 
Jan. 1968 
1959 
Dec. 1914 
Aug. 1968 
1939 
63,284,470 193,383,356 
- 18,950,290 
249,052 552,780 
- 11,699 
Nov. 1979 
77,761 
241,896 
751,485 1929 
11-16

NEW ORLEANS, LA, DISTRICT 
TABLE 11-C 
(CONTINUED) 
OTHER AUTHORIZED NAVIGATION PROJECTS 
Cost to Sep. 1987 
For Last Mo. and Yr. 
Full Report Operation Completed 
See Annual and Deauthorized 
Project Status Report For: Construction Maintenance or Reclassified 
Mermentau River, Bayou Nezpique, 
and Bay Des Cannes, LA Complete 1977 5,197,97516 114,519- 
Mermentau River, LA Complete 1985 4,672,579 19,065,687 Jul. 1952 
Mississippi River-Gulf Outlet, 
Michoud Canal, LA Complete 1976 2,499,555 - Nov. 1974 
Mississippi River Outlets, 
Venice, LA Complete 1986 10,008,100 10,732,538 Complete 
Navigation work under special 
authorization (Calcasieu Pass 
channel in Old River Bend 
at Cameron, LA)17 - 1957 - 139,755- 
Pass Manchac, LA Complete 1950 79,845 13,545 1912 
Petite Anse, Tigre, and 
Carlin Bayous, LA Inactive 1981 - 1,450,172 Nov. 1980 
Removal of Aquatic Growth, LA 1984 - 24,284,781 
Sulphur River, AR and TX3,6 - 1919 45,989 - - 
Tangipahoa River, LA - 1985 - 630,988- 
Tickfaw, Natalbany, Ponchatoula, 
and Blood Rivers, LA4 Complete 1973 8,115 92,163 1921 
Vinton Waterway, LA21 Deauthorized 1950 - - Nov. 1979 
Waterway from White Lake to 
Pecan Island, LAs -1948 10,904 0,742 
Waterway from Empire, 
LA, to Gulf of Mexico Complete 1981 1,068,142 1,005,238 Jun. 1950 
1. Transferred to Department of Transportation. Authorized 
under Truman-Hobbs Act. 
2. Date authorized. 
3. Completed. Date will be furnished when available. 
4. Includes previous project costs. 
5. No commerce reported. 
6. Abandonment recommended in H. Doc. 467, 69th 
Cong., 1st sess. 
7. Includes $56 cost incurred in 1969. 
8. Completed except that portion above mile 10.3 providing 
for widening from 40 feet to 60 feet, which is inactive. 
9. By Public Law 88-404, that portion of Bayou Terrebonne 
between point where Barrow Street crosses said 
stream and a line determined by prolonging and extending 
eastern right-of-way line of New Orleans Boulevard southerly 
to south bank of said stream was declared nonnavigable. 
10. Includes $66,000 contributed funds. 
11. Operation and maintenance of the structure reported 
under project "Calcasieu River and Pass, LA." 
12. Excludes $50,000 contributed funds. 
13. Not completed; incorporated in navigation project 
"Mermentau River, LA." 
14. Not completed; superseded for most of its length by 
present 12- by 125-foot Gulf Intracoastal Waterway, which 
coincides with or parallels it. 
15. Maintenance project; no future work schedules. 
16. Includes $57,555 ($29,974 of which was from Public 
Works funds) for new work on previous project. Includes 
$114,519 for maintenance of previous project. 
17. Work is under continuing authority. 
11-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 11-D OTHER AUTHORIZED FLOOD 
PROJECTS 
CONTROL 
For Last Cost to Sep. 1987 
Full Report Operation 
Mo. and Yr. See Annual and Mo. and Yr. 
Project Deauthorized Report For: Construction Maintenance Completed 
Aloha-Rigolette Area, Grant and 
Rapides Parishes, LA1 
Amite River and Tributaries, LA 
Bayou Bodcau, Red Chute, and Loggy 
Bayou, LA1, 12 
Bayou Choupique, LA3 
Bayou Nicholas, Coushatta, LA3 
Bayou Pierre in vicinity of 
Shreveport, LA 1,2,12 
Bayou Rapides, LA3 
Black Bayou Reservoir, LA 1,4,5,12 
Black Bayou-Pine Island Area, LA' 
Campti-Clarence Area in Natchitoches 
Parish, LA 
Choctaw Bayou and Tributaries, LA 1,7 ,12 
Colfax, Grant Parishes, LA1,7 
Cooper Lake and Channels, TX8 
East Point, LA 
Ferrells Bridge Dam-Lake O' the Pines, 
TXs,9 
Garland City, AR 12 
Grant Parish below Colfax, LA",9 
Harvey Canal, Bayou Barataria Levee, LA 
AHRe.m1,9p,1s2tead County Levee District No. 1, 
Maniece Bayou, AR. 1,2,12 
McKinney Bayou, Finn Bayou 
Segment, AR.' 0"12 
Natchitoches Parish, LA 1,2 
Pineville, Red River, LA 1", ,12 
Posten Bayou, AR. 11,12 
Red River Parish, LA" ,9 ,12 
Red River in vicinity of Shreveport, LA1,12 
Saline Point, LA",9 
Aug. 1977 
1956 
1964 
1948 
1954 
1964 
1951 
1952 
1945 
1963 
1978 
1977 
1938 
1979 
1969 
1979 
1976 
1941 
1979 
1941 
1970 
1963 10o 
1956 
1953 
1973 
1939 
1953 
1945 
$ 1,653,189 
3,034,2552 
319,200 
129,930 
70,717 
243,3362 
95,179 
336,063 
1,655,700 
741,892 
70,348 
20,839,300 
486,069 
14,175,197 
1,335,842 
38,809 
1,018,005 
88,006 
970,9322 
1,529,478 
232,426 
149,435 
3,908,000 
124,111 
8,301,021 
11-18 
Apr. 1955 
Feb. 1964 
Jan. 1948 
Mar. 1954 
Jun. 1964 
Jun. 1939 
Dec. 1951 
May 1963 
Jul. 1978 
Apr. 1976 
Aug. 1968 
Jul. 1974 
9 
Aug. 1969 
Aug. 196955 
Aug. 1955 
Dec. 1951 
9 
Mar. 1953

NEW ORLEANS, LA, DISTRICT 
TABLE 11-D OTHER AUTHORIZED NAVIGATION PROJECTS 
(CONTINUED) 
Cost to Sep. 1987 
For Last Mo. and Yr. 
Full Report Operation Completed 
See Annual and Deauthorized 
Project Status Report For: Construction Maintenance or Reclassified 
Twelvemile Bayou, LA3 1966 335,433 - May 1965 
Wright Patman Dam and Lake, TX8 - 1979 35,659,176 11,195,021 - 
1. Authorized under project "Red River Below Denison 
Dam."
2. In addition, the following was expended from con 
tributed funds: 
Amite River and tributaries ............. $ 430 
Bayou Pierre in vicinity of 
Shreveport, LA ........................ 89,047 
Choctaw Bayou and Tributaries, LA ...... 170,799 
Harvey Canal, Bayou Barataria 
Levee, LA ....... ...................... 425,209 
Maniece Bayou, AR....................39,293 
Natchitoches Parish, LA .............. . . 250,000 
3. Authorized by Chief of Engineers. (Sec. 205, 1948 
Flood Control Act, as amended.) 
4. Construction not initiated. 
5. Inactive. 
6. Includes $92,000 for preauthorization studies. 
7. Completed under provisions of Sec. 7, Flood Control 
Act 1928, as amended by Sec. 9, Flood Control Act 1936, 
and 
included in 1939 Annual Report of President, Mississippi 
River Commission, p. 2214. 
8. These projects transferred to the Fort Worth District, 
Southwestern Division, during FY 1979. 
9. Completed. Date will be furnished when available. 
10. Date authorized. 
11. Posten Bayou Project, authorized by Senate and 
House Resolutions, Dec. 17 and 15, 1970, deleted the plan 
authorized by the Flood Control Act dated Aug. 3, 1955. 
12. These projects transferred to the Vicksburg District 
during FY 1983. 
11-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 11-E ACTIVE GENERAL INVESTIGATIONS 
(96x3121) 
Federal Cost Totals by 
Item and CWIS Number FY 87 Categories 
SURVEYS (Category 100) 
Navigation (110) 
Bayou Lafourche & Lafourche-Jump Waterway, LA -1009 $ 21,575 
GIWW LA & TX Section -10032 355,608 
Mississippi River-Gulf Outlet, St. Bernard Parish, LA 
(Bank Erosion) -10241 100,567 
477,750 
Flood Control Studies (120) 
Aloha-Rigolette Area, LA -12123 9,226 
Amite River & Tributaries, LA -50100 361,016 
Lake Pontchartrain-West Shore, LA -79700 98,751 
Louisiana Coastal Area, LA, Hurricane Protection -12445 170,285 
Louisiana Coastal Area, LA, Land Loss & Marsh Creation -12348 91,343 
Louisiana Coastal Area, LA, Shore & Barrier Island Erosion -12354 109,812 
Louisiana Coastal Area, LA, Water Supply -12355 0 
Mermentau, Vermilion & Calcasieu Rivers & Bayou Teche, LA -34014 459,670 
Upper Bayou Teche, LA -12435 33,861 
West Bank of Mississippi River-Vicinity of New Orleans, LA -59360 291,118 
1,625,082 
Review of Authorized Projects (160) 
Deauthorization Review -77000 135 
Miscellaneous Activities (170) 
Special Investigations -17250 21,925 
Coordination Studies with Other Agencies (180) 
Planning Assistance to States (186) -51850 0 
Planning Assistance to States (186) -14822 46,316 
TOTAL (Category 100) $2,171,208 
COLLECTION AND STUDY OF BASIC DATA (Category 200) 
Flood Plain Management Services (250) 
Flood Plain Management Services 147,741 
South East Louisiana Hurricane Evacuation -83001 27,479 
TOTAL (Category 250) 175,220 
Coastal Data Collection (280) 
Re-evalhation of Section 54 Projects -53891 4,428 
TOTAL (Category 200) 179,648 
GRAND TOTAL GENERAL INVESTIGATIONS $2,350,856 
11-20

VICKSBURG, MS, DISTRICT* 
This district comprises western and central Mississippi, 
southern Arkansas, northern Louisiana, and a 
very small portion of southwestern Tennessee, embraced 
in drainage basins of eastern tributaries of 
Mississippi River south of Horn Lake Creek to and 
including Buffalo River; Pearl River Basin in Mississippi; 
independent tributaries of the Gulf of Mexico 
south of the Buffalo River Basin to the Mississippi- 
Louisiana state line; western tributaries of Mississippi 
River between White and Atchafalaya Rivers 
including Arkansas River Basin below a point 3 miles 
upstream from Pine Bluff and Arkansas River below 
mile 36.1 near Pendleton, Arkansas; Ouachita and 
Black Rivers in Arkansas and Louisiana; and Red 
River in Louisiana and Arkansas to the Texas- 
Arkansas state line. 
IMPROVEMENTS 
Navigation 
1. Ouachita and Black Rivers below 
Camden, AR ......................... 
2. Red River emergency bank 
protection ........................... 
3. Red River Waterway-Mississippi 
River to Shreveport, LA .............. 
4. Yazoo River, MS ..................... 
5. Navigation work under special 
authorization ........................ 
Flood Control 
6. Bayou Bartholomew and 
Tributaries, AR and LA .............. 
7. Bayou Bodcau and tributaries, 
AR and LA .......................... 
8. Lead Bayou, MS ..................... 
9. Ouachita River Levees, LA ........... 
10. Ouachita River and tributaries 
AR and LA ........................... 
11. Pearl River Basin, MS and LA ........ 
12. Pearl River, Slidell, St. Tammany 
Parish, LA .......................... 
13. Porter Bayou, MS .................... 
14. Red River Below Denison Dam 
(Vicksburg Dist.) ..................... 
15. Red River below Denison Dam, levees 
and bank stabilization 
(Vicksburg District) .................. 
Page Flood Control (cont) 
16. Red River Waterway-Shreveport, 
12-2 LA, to Index, AR ..................... 
17. Inspection of completed Flood 
12-2 Control Projects ...................... 
18. Flood control work under 
12-2 special authorization ................. 
12-3 
12-3 Tables 
Table 12-A 
12-4 
12-4 
12-5 
12-5 
12-5 
12-5 
12-6 
12-6 
Table 12-B 
Table 12-C 
Table 12-D 
Table 12-E 
Table 12-F 
Table 12-G 
12-7 Table 12-H 
12-7 
Table 12-I 
Cost and Financial 
Statement ...................... 
Authorizing Legislation ........ 
Ouachita and Black Rivers, 
AR and LA (9-Foot Project), 
Locks and Dams ........... 
Other Authorized Navigation 
Project ...... ................ 
Ouachita River and Tributaries 
Existing Project .............. 
Red River Below Denison Dam 
(Vicksburg District) 
New Projects ................. 
Red River Below Denison Dam 
(Vicksburg District) 
Incorporated Projects ......... 
Other Authorized Flood 
Control Projects ........... 
Active .General Investigations ... 
Page 
12-7 
12-7 
12-8 
12-9 
12-11 
12-14 
12-15 
12-17 
12-18 
12-19 
12-20 
12-22 
12-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. OUACHITA AND BLACK RIVERS 
BELOW CAMDEN, AR 
Location. Ouachita River rises in Polk County, AR, 
and flows southeasterly and southerly about 600 miles. 
Below its confluence with the Tensas and Little Rivers 
at Jonesville, LA, it is called Black River, which enters 
Red River 35.5 miles from the Mississippi River. 
Previous projects. See page 683 of Annual Report 
for 1962 for details. 
Existing project. See page 684 of Annual Report 
for 1962 for details of the old 6.5-foot navigation project. 
New work for completed project costs $7,064,031.68, 
exclusive of amounts expended under previous projects. 
Modified project and project for Red River below 
Fulton, AR, provide for a channel 9 feet deep and 100 
feet wide in Red River between Old River and mouth 
of Black River, and in Black and Ouachita Rivers from 
mouth of Black River to Camden, AR. This is being 
accomplished by construction of four new locks, 84 feet 
by 600 feet; new dams; channel realinement to accommodate 
the 9-foot draft tow; and measures to preserve 
Catahoula Lake for migratory waterfowl. The River 
and Harbor Act of 1970 authorized establishment of 
wildlife refuges along Bayou D'Arbonne (14,700 acres) 
in connection with Columbia Lock and Dam and at 
Felsenthal Lock and Dam (65,000 acres). The Bayou 
D'Arbonne refuge was increased to 18,000 acres at the 
request of the Bureau of Sport Fisheries and Wildlife. 
Estimated cost for new work for 9-foot navigation 
project is $274,702,000 including $258,000,000 Federal 
and $16,702,000 non-Federal for lands, damages, and 
relocations. 
Local cooperation. Local cooperation for all completed 
work in Louisiana has been furnished in a timely 
manner. It is anticipated that local interests in Louisiana 
will be able to supply the necessary rights-of-way 
for construction of the cutoffs and bend widenings. 
Local interests in Arkansas have furnished the rightsof-
way for the Felsenthal and H. K. Thatcher Locks 
and Dams, formerly called Calion Lock and Dam, and 
it is anticipated that the remaining rights-of-way will 
be furnished when needed. The city of Camden, AR, 
has furnished land for the Sandy Beach recreation area. 
All assurances from local interests including supplemental 
assurances (Public Law 91-646) have been 
accepted. 
Terminal facilities. Public loading docks are at 
Columbia, LA, and Camden and Crossett, AR. Privately 
owned docks and loading and unloading facilities 
are at Columbia, Monroe, and Sterlington, LA, and 
El Dorado, Calion, and Camden, AR. Two grainhandling 
ftcilities and a petroleum-loading facility are 
in the vicinity of Jonesville, LA, and a grain-handling 
facility is in the vicinity of Acme, LA. 
Operations and results during fiscal year. The 
following recreation facilities in the Felsenthal 
National Wildlife Refuge were completed: Shallow 
Lake Access Point, Pine Island Access Point, Pereogethe 
Lake Access Road, Calion Lock and Dam No. 
8, and Shallow Lake Access Road. Other construction 
contracts completed during FY 87 were: Beautification 
and Landscaping at Felsenthal, Calion Wastewater 
Disposal System, and Calion Access Channel Part II. 
The Vicksburg District initiated construction of the 
last three recreation projects in the Felsenthal National 
Wildlife Refuge (Crossett Harbor Phase II, Grand 
Marais Phase II, and H. K. Thatcher Access Site). 
Initiated construction of the beautification at H. K. 
Thatcher Lock and Dam. 
Maintenance dredging removed 1,650,195 cubic 
yards of material from the Ouachita-Black Waterway 
during FY 87. 
Condition as of Sep. 30. All four locks and dams 
associated with the project are complete and in operation. 
With the completion in FY 87 of Calion Access 
Channel Part II Construction Contract, nine-foot navigation 
depth is now provided for the entire project 
limits. 
2. RED RIVER EMERGENCY 
BANK PROTECTION 
Location. In northwest Louisiana, southwest Arkansas, 
and northeast Texas, along the Red and Old Rivers 
between the Mississippi River and the head of the levee 
system above Index, AR. 
Existing project. Provides for realigning the banks 
by means of cutoffs and training works and for stabilizing 
banks by means of revetments, dikes, and other 
methods as emergency conditions may require in 
advance of developing the design for the entire Red 
River Waterway project. Estimated cost for this work 
(October 1986) is $85,400,000 Federal and $2,182,000 
non-Federal, including a cash contribution of $7,000. 
Local cooperation. Fully complied with. For details 
see pages 11-19 to 11-20, Annual Report FY 80. 
Operations and results during fiscal year. Work 
by hired labor consisted of preparing plans and specifications, 
surveys, and general engineering. Completion 
of the Goose Lake realignment, river mile 407- 
L, and Little River Phase III revetment, river mile 
405-L. Oak Revetment Extension, river mile 347-R, is 
continuing. Fulton Upstream Extension, river mile 
402-L and Candler Lake Revetment, river mile 365- 
R were initiated. 
Condition as of Sep. 30. Construction was initiated 
in October 1972 and is 76% complete. 
3. RED RIVER WATERWAYMISSISSIPPI 
RIVER TO 
SHREVEPORT, LA 
Location. From east central to northwest Louisiana 
along the Red and Old Rivers between the Mississippi 
River and Shreveport, LA. 
12-2

VICKSBURG, MS, DISTRICT 
Existing project. Provide a navigation route from 
the Mississippi River at the junction with Old River 
via Old and Red River to Shreveport, LA, developing 
a channel approximately 236 miles long, 9 feet deep, 
and 200 feet wide. The development will include five 
locks and dams, realignment and contraction of the 
river as necessary to develop an efficient channel, and 
bank stabilization as necessary to hold the newly 
developed channel in position. Facilities to provide 
opportunities for recreation and for fish and wildlife 
development are an integral part of the project. Estimated 
cost for new work is $1,621,307,000 Federal and 
$87,464,000 non-federal, including $43,677,000 contributed 
funds. The Federal cost excludes $307,000 for 
aids to navigation by U.S. Coast Guard. 
Local cooperation. For details see page 11-21, 
Annual Report FY 80. 
The Red River Waterway Commission, governing 
body of the Red River Waterway District, executed 
an act of assurance for all project features in Louisiana 
on Feb. 26, 1969, supported by resolution dated Jan. 
30, 1969. The assurances were accepted for and on 
behalf of the United States on Apr. 15, 1969. The 
Commission furnished amended assurances covering 
the provisions of Public Law 91-646 on May 23, 1973, 
for the portion of the project within Louisiana which 
were accepted for and on behalf of the United States 
on Nov. 14, 1973. 
Terminal facilities. Local interests are to provide 
adequate terminal facilities along the waterway. The 
Corps entered into an agreement with the City of 
Alexandria, LA, whereby material excavated from the 
Philip Bayou Realignment could be used as fill for port 
construction at mile 109. Construction of the realignment 
and port fill are complete. 
Operations and results during fiscal year. Hired 
labor continued work on Design Memoranda, preparation 
of Plans and Specifications, Surveys, General 
Engineering, and Model Studies. The following sixteen 
bank stabilization items were awarded: Pool I - Hog 
Lake ACS, Pool 2- Wiggins Revetment Ph II, Darrow 
Realignment, Deloges Bluff Revetment, Colfax Revetment, 
Whittington Dikes, and Alexandria Front Revetment, 
Pool 3 - Socot Realignment, St. Maurice Realignment, 
Kadesh Realignment, Ile au Vaches 
Realignment, Lumbra Revetment, Campti Realignment 
and Smith Island Realignment, Pool 4 - Carrol 
Realignment Ph I, Pool 5, - Wilkerson Pt. (Rothschild) 
Realignment. Also initiated was the Lock and Dam 
No. 1, Ph I Recreation Site; Initial Construction Dredging 
in Pools 1 and 2; and Initial Excavation and 
Cofferdam work at Lock and Dam 3. 
Items continuing include John H. Overton Lock and 
Dam, reaching 94 percent completion in September 
1987, Lorran Lake Realignment, Joffrion Revetment, 
Cognac Revetment, Bayou Cocodrie. Dikes and Larto 
ACS, and Phase II Recreation facilities at Fort Buhlow. 
The following contracts were completed: Hadden Ft. 
DeRussy Capout, Phillip Bayou Realignment, Meade 
Realignment, Grand Bend Realignment, England Realignment, 
and the contract consisting of bank stabilization 
and a portion of the cofferdam at Lock and 
Dam No. 3. 
During FY 87, approximately 1,958,000 cubic yards 
of material were dredged in Pool 1 and below Pool 1. 
Condition as of Sep. 30. Construction was initiated 
in July 1973, and project is 44 percent complete. 
4. YAZOO RIVER, MS 
Location. Formed by junction of Tallahatchie and 
Yalobusha Rivers in Leflore County, MS, flows about 
169 miles southerly and southwesterly, and enters 
Mississippi River at Vicksburg, MS. (See Mississippi 
River alluvial valley quadrangle maps.) 
Previous projects. See page 681 of Annual Report 
for 1961 for details. 
Authorized project. The Yazoo River Navigation 
project consists of a 9-foot channel from its mouth to 
Greenwood, MS, mile 164.9 (present mileage), with a 
minimum width of 150 feet. The project includes a 
single lock (84 feet by 600 feet) and a dam located near 
Vicksburg, dredging and channel realinement; 600,000 
acre-feet of additional storage in Sardis Lake to augment 
low flows in the Yazoo River, and recreation 
features. 
Local cooperation. Requirements of local cooperation 
are fully described on page 12-3 of FY 80 Annual 
Report. 
Terminal facilities. At Greenwood there is a privately 
owned dock and a grain-loading facility. There 
are privately owned facilities for loading grain at 
Belzoni and Satartia. At Yazoo City there is a privately 
owned grain-loading facility, a private log-loading 
facility, a private dock to handle dry and liquid fertilizer, 
and a public terminal. 
Operations and results during fiscal year. No 
activity for the fiscal year. 
Condition as of Sep. 30. A portion of the river is 
navigable; however, in order for the entire system to 
be that way, alteration of the Sheppardtown Bridge 
will be necessary. No funds have been provided for 
this alteration. No work done on new authorization. 
Phase I studies are being deferred on the nine foot 
project due to lack of economic justification. 
5. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Sec. 107, Public 
Law 87-645, as amended (preauthorization). 
As stated in the FY 86 Annual Report, the following 
projects were terminated due to new policy guidance 
on small ports: Union County, AR; Greenwood Port, 
MS; Bastrop Port, LA; Yellow Bend, AR; and Two 
Bayou, AR. No work was perforemd on these projects 
12-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
in FY 87 due to the same policy guidance. In regard 
to Yellow Bend, AR, Congress has added $1,000,000 
to the FY 88 Senate Energy and Water Appropriations 
Bill. 
Flood Control 
6. BAYOU BARTHOLOMEW AND 
TRIBUTARIES, AR AND LA 
Location. Bayou Bartholomew rises in Jefferson 
County, AR, about 10 miles northwest of Pine Bluff 
and flows southerly about 370 miles to join the Ouachita 
River upstream from Sterlington, LA. 
Authorized project. Project includes ten waterretention 
lakes in the western tributaries of Bayou 
Bartholomew in Arkansas and six local levee units 
along the main stem of Bayou Bartholomew in Louisiana. 
However, because of public opposition to construction 
of the loop levees, preconstruction planning 
of the six loop levees has been deferred until such time 
as there is sufficient support by local interests. Channel 
improvements previously authorized are deferred. 
Latest approved (1979) estimated cost of new work is 
$46,913,000 including $44,800,000 Federal and 
$2,113,000 non-Federal. 
Local cooperation. Requirements of local cooperation 
are fully described on page 12-5 of Fiscal Year 
80 Annual Report. 
Operations and results during fiscal year. Preconstruction 
planning and design have been deferred 
pending favorable benefit-cost ratios. 
Condition as of Sep. 30. Preparation of general 
design memorandum has been deferred due to lack 
of economic justification. 
Status of studies: A re-evaluation study is underway 
to determine if there are any feasible alternatives. 
7. BAYOU BODCAU AND 
TRIBUTARIES, AR AND LA 
Location. In east bank flood plain of Red River. 
Bayou Bodcau rises in vicinity of Hope, AR, and flows 
southerly through Bayou Bodcau Reservoir and Bodcau 
Lake to join Cypress Bayou and form Red Chute Bayou, 
continues through Red Chute Bayou, Flat River, and 
Loggy Bayou to Red River, about 40 miles below 
Shreveport, LA. 
Authorized project. Cypress Bayou-Red Chute 
Bayou levee: Extend existing levee from about 8 miles 
southeast of Benton, LA, proceeding southerly to junction 
of Cross and Red Chute Bayous, and then parallel 
to Red Chute Bayou on the right descending bank to 
its junction with Cutoff Bayou for a total distance of 
approximately 25 miles; construct landside drainage 
channel and several culverts with flap gates to Red 
Chtte Bayou; construct approximately 5 miles of levee 
on left descending bank of Red Chute Bayou extending 
south from Louisiana Highway 612, and relocate utility 
lines as needed. 
Flat River-Loggy Bayou levee: Extend from lower 
end of existing Red River levee in vicinity of Ninock, 
LA, along high (left descending) bank of Red River 
to a point on right descending bank of Loggy Bayou, 
about 1 mile above its mouth, thence generally along 
right descending bank of Loggy Bayou, Red Chute, 
Cutoff Bayou, and Flat River to Taylortown to tie into 
existing Red River levee; close Flat River near its 
junction with Cutoff Bayou and install one 36-inch 
round corrugated metal pipe with automatic flap gate 
to drain isolated pockets and provide uninterrupted 
drainage; construct drainage structures on Flat River 
near its junction with Red Chute Bayou and along 
alignment of the Loggy Bayou in the vicinity of Grassy 
Lake; and make necessary utility relocations. 
Flat River channel improvement: Enlarge to average 
bottom width of 50 feet with flat side slopes and deepen 
by 2 to 6 feet from the confluence with Cutoff Bayou 
to junction with Cooper Bayou, 11.6 miles, including 
required relocations and modifications of utilities. 
The subject project was one of the Water Resources 
projects reviewed in March 1977 in accordance with 
the President's request. As a result of this review, the 
President recommended that project construction be 
halted and the project be deauthorized. Congress subsequently 
directed the Corps to take the following two 
actions: Construct levees on Red Chute Bayou below 
Cutoff Bayou that are required to prevent induced flood 
damage that would otherwise result from the abandonment 
of partly completed project. Initiate studies 
to determine if modifications to the authorized project 
would permit its completion in a form consistent with 
the current executive policy. 
Engineering and design work for the induced flood 
prevention plan below Cutoff Bayou and project modification 
studies were being conducted when President 
Reagan signed, on Dec. 4, 1981, the Energy and Water 
Development Appropriations Bill of 1982, which contained 
language that "reconfirmed without further 
study and analysis" the plan for flood control for the 
project as approved by the Flood Control Act of 1965. 
Resumption of construction was scheduled to begin 
in 1984. The project sponsor, however, requested that 
construction be delayed while a reevaluation of the 
project was made. 
The reevaluation study has been completed. A summary 
of study results was submitted in January 1987 
which recommended no further Federal action. The 
Lower Mississippi Valley Division approved the report 
and a notice of study termination was disseminated 
in June 1987. 
Local cooperation. For details see pages 11-24 and 
25, Annual Report for FY 80. 
Operations and results during fiscal year. New 
work by hired labor forces consisted of completion of 
the reevaluation study. 
12-4

VICKSBURG, MS, DISTRICT 
Condition as of Sep. 30. Construction was initiated 
in October 1974 and is 17 percent complete. Alternatives 
to provide flood protection are being considered 
and these efforts will continue. 
8. LEAD BAYOU, MS 
Location. Lead Bayou is a tributary of the Sunflower 
River in Bolivar and Sunflower Counties, MS, approximately 
30 miles from the Mississippi River near 
Cleveland, MS. 
Existing project. The plan of improvement was for 
enlargement of the existing Lead Bayou channel to 
provide a 1.5-year degree of protection to agricultural 
areas and a 10-year degree of protection to the small 
developed area near Cleveland, MS. Total estimated 
Federal cost is $1,526,000. 
Local cooperation. Fully complied with. The stabilization 
of one bridge has been accomplished by the 
Vicksburg District. 
Condition as of Sep. 30. The construction contract 
was completed Sep. 14, 1983. The stabilization of (1) 
bridge remains and will be accomplished by the Vicksburg 
District. 
9. OUACHITA RIVER LEVEES, LA 
Location. East bank of Ouachita River between 
Bastrop, LA, and Sandy Bayou. Loop levees on the west 
bank at West Monroe, Columbia, and Bawcomville. 
Existing project, There are 105.8 miles of levee on 
the east bank and 11.6 miles of levee in the three loops 
on the west bank. A letter report, approved by the Chief 
of Engineers, authorized gravel surfacing 40.3 miles 
of levee, enlargement of 40.4 miles of levee, and a 5.7- 
mile southward extension of the east bank levee. 
Approved (1979) estimated Federal cost is $9,400,000. 
Estimated non-Federal cost is $25,000. 
Local cooperation. Requirements and assurances of 
local cooperation are fully described on page 12-6 of 
FY 80 Annual Report. 
Condition as of Sep. 30. Item I of the Monroe to 
Sandy Bayou Levee enlargement project was completed 
July 7, 1978. Additional work was deferred 
pending results of a comprehensive study of the entire 
Ouachita River Levee System. A summary report 
indicating that it is economically feasible to raise 
portions of the existing levee to authorized grade and 
that complete rehabilitation of the levee system is 
necessary was approved by LMVD on Oct. 1, 1986. 
The study results were disseminated to the project 
sponsor and interested parties in October 1986. The 
Project was reclassified as an active project on May 
7, 1987. The summary report has been sent to the Office 
of the Chief of Engineers to meet engineering and 
budgetary requirements prior to resumption of 
funding. 
bridge remains and will be accomplished by the 
Vicksburg District. 
10. OUACHITA RIVER AND 
TRIBUTARIES, AR AND LA 
Location. Improvements comprising comprehensive 
projects are on main stem Ouachita River, AR and 
LA, on its tributaries, Caddo and Little Missouri 
Rivers, and in Pine Bluff, AR. Description of Ouachita 
River Basin is presented in greater detail on page 690 
of Annual Report for 1962. 
Existing project. The authorized general plan for 
flood control and other purposes in the Ouachita River 
Basin includes the projects listed in Table 12-F. The 
1966 Flood Control Act modified the Bayou Bartholomew 
and Tributaries, AR and LA, project to 
include ten water-retention lakes in the western tributaries 
of Bayou Bartholomew in Arkansas and six 
local levee units along the main stem of the bayou in 
Louisiana. 
Local cooperation. Fully complied with for completed 
features of comprehensive project. (See individual 
statements for further details.) 
Operations and results during fiscal year. Operations 
for Blakely Mt. Dam-Lake Ouachita, DeGray 
Lake, Narrows Dam-Lake Greeson, Bayou Bartholomew 
and Tributaries, Monroe Floodwall, and 
Ouachita River Levees are shown in individual reports 
in 1985 report and Monroe 84 report. 
Condition as of Sep. 30. Pertinent data on those 
features which are complete or not started are in Table 
12-F. Conditions of Blakely Mt. Dam-Lake Ouachita, 
DeGray Lake, and Narrows Dam-Lake Greeson are 
given in the individual reports in 1985 report. 
An overall basin study is ongoing. Interim study of 
the Ouachita River Levees is complete. The Interim 
Report recommended raising the levee to authorized 
grade. The Levee Project has been reclassified as 
active. Interim studies for Monroe-West Monroe and 
the Arkansas Lakes are continuing. Studies for Youngs 
Bayou and Chauvin Bayou in Monroe have been completed 
and a report recommending construction under 
Section 205 of the Flood Control Act of 1945 submitted 
to OCE, Construction of flood damage reduction measures 
for Monroe-West Monroe, Ouachita Parish, LA, 
is authorized in the Water Resources Development Act 
of 1986 subject to the review of the Secretary of Army. 
11. PEARL RIVER BASIN, MS AND LA 
Location. The basin comprises most of the Southcentral 
portion of Mississippi and a small part of 
southeast Louisiana. The Pearl River begins in 
Neshoba county, MS and flows southwesterly 113 miles 
to the vicinity of Jackson, MS, then southeasterly 233 
miles to the vicinity of Bogulasa, LA. At that point, 
12-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
the Pearl River splits into the East and West Pearl 
Rivers, and flows southerly 44 and 48 miles, respectively, 
before entering the Rigolets and Lake Borgne. 
Existing projects. The Jackson-East Jackson Flood 
Control Project provides for improvements of the Pearl 
River at Jackson, MS. This project includes two levee 
systems totaling 13.1 miles in length, with two pumping 
stations, four gated outlets, and 5.34 miles of channel 
rectification including three cutoffs with a total length 
of 2.2 miles in the Pearl River. This project was 
authorized by the Flood Control Act of July 14, 1960. 
Construction began in July 1964 and work was completed 
in FY 68. Total Federal cost of the project was 
$7,190,200. The FY 83 Jobs Bill authorized extension 
of the Jackson-East Jackson West Bank Levee system 
along the Fortification Street 1-55 exit. This extension 
was initiated and completed in FY 84. 
Public Law #98-63, dated July 29, 1983, authorized 
the vicinity of Jackson project. This authority provided 
for additional measures to prevent recurring flood 
damages along the Pearl River at Jackson and included 
3.3 miles of floodway clearing and enlarging the opening 
at the Highway 25 Bridge. This work has been 
completed. Mitigation lands for the clearing were 
purchased by the local sponsor in May 85 and the Corps 
has reimbursed the local sponsor to cover the cost of 
these lands. Total Federal Cost of this project is 
$1,800,000. 
Authorized projects. Public Law 99-88, dated 
August 15, 1985, authorized planning, design, engineering, 
and construction of a levee system in Slidell, 
LA, to protect 3,265 residential and commercial structures 
from floods in the West Pearl. 
Local cooperation. For the Jackson-East Jackson 
and vicinity of Jackson Projects, the requirements are 
as prescribed in Section 3 of the Flood Control Act 
of 1936, as amended. This Act requires that a local 
sponsor provide the easements, and rights-of-way 
necessary for construction of the project; hold and save 
the United States free from damages due to construction 
of the project; and maintain and operate all works 
after completion in accordance with regulations prescribed 
by the Secretary of the Army. The Slidell Levee 
Project authorization required cost-sharing and new 
guidelines for local cooperation. A Local Cooperation 
Agreement consistent with Public Law 99-88 was 
signed by the Slidell Local Sponsor and the Assistant 
Secretary of the Army for Civil Works on June 30, 
1986. The local sponsors are as follows: Jackson-East 
Jackson, Rankin-Hinds Pearl River Flood Control 
Drainage District; Vicinity of Jackson Project, Pearl 
River Basin Development District; Slidell Levee Project, 
St. Tamany Levee District. 
Condition as of Sep. 30. An overall basin study is 
underway. Flood control feasibility studies for Jackson, 
MS recommending the Shoccoe Dry Dam, and for 
Slidell, LA; recommending a 15 mile levee system, have 
been completed. Detailed engineering and design studies 
are underway for Shoccoe Dam and the Slidell 
levee system. Studies of various flood control measures 
for the Carthage - Leake County, MS, area have been 
completed. Several of these features were authorized 
by Public Law 99-662. Flood control feasibility studies 
for the remainder of the basin include major emphasis 
on Columbia, Picayune, and Monticello, Missisippi; 
Bogulusa, Louisiana, and the Bogue Chitto Subbasin. 
Navigation Studies are being conducted on the East 
and West Pearl Rivers. The navigation study for Port 
Bienville, MS, has been terminated due to withdrawal 
of the Hancock County Port and Harbor Commission 
as local sponsor. 
12. PEARL RIVER, SLIDELL, 
ST. TAMMANY PARISH, LA 
Location. The project is located in the southeastern 
portion of the State of Louisiana and consists of the 
area bounded by the West Pearl River on the east, 
Interstate 10 on the west, and Lake Pontchatrain on 
the south. 
Authorized project. The project is broken into two 
segments of levees. The segment north of 1-10 consists 
of 4.5 miles of levee, a pumping station, a floodgate, 
and other minor drainage structures. This levee protects 
the Slidell area north of 1-10 from flooding 
associated with a 200-year hydrological event on the 
Pearl River. The segment south of 1-10 consists of 10.5 
miles of levees, two pumping stations, floodgates, and 
other minor drainage structures. This levee protects 
the Slidell area south of 1-10 from flooding associated 
with a 200-year hydrological event on the Pearl River 
and provides the same level of protection against 
hurricane surges. These 2 levee segments total 15 miles 
of levee and would protect some 3,029 homes. 
Local cooperation. The project sponsor, St. Tammany 
Levee District, and the Assistant Secretary of 
the Army (Civil Works), in an agreement consistent 
with the Fiscal Year 1985 Supplemental Appropriation 
Act (PL 99-88) and Senate Report 1567, signed the 
Local Cooperation Agreement June 30, 1986. 
Operations and results during fiscal year. Continued 
engineering studies in preparation of General 
Design Memorandum. 
Condition as of September 30. Process of developing 
General Design Memorandum. No previous construction 
has taken place. 
13. PORTER BAYOU, MS 
Location. Porter Bayou is located in Bolivar and 
Sunflower Counties, MS. It lies approximately 25 miles 
east of the Mississippi River, is approximately 5 miles 
south of Cleveland, MS, and travels through the town 
of Shaw, MS. 
Existing project. The plan of improvement calls for 
selective snagging and clearing of Porter Bayou from 
mile 12.5 to mile 32.3. This plan provides a 0.5-year 
frequency protection for the Porter Bayou area. All 
12-6

VICKSBURG, MS, DISTRICT 
construction is being performed from one side of the 
stream, leaving the other side undisturbed. The total 
estimated Federal cost of the project is $1,214,000. 
Local cooperation. Fully complied with. 
Condition as of Sep. 30. The construction contract 
was completed November 16, 1983. A separate contract 
was let to biologically remove alligatorweed at Shaw, 
Mississippi, and follow-up with herbacide has been 
added. 
14. RED RIVER BELOW DENISON 
DAM (VICKSBURG DISTRICT) 
Location. On Red River and its tributaries below 
Denison Dam, in Oklahoma, Arkansas, Texas, and 
Louisiana. (Refer to Geological Survey State maps and 
folio "Maps of Red River"-1958 edition.) 
Existing project. Flood Control Act of 1946 
approved general plan for flood control on Red River 
below Denison Dam, TX and OK, which provides for 
construction of six flood control reservoirs in combination 
with existing or authorized Federal and non- 
Federal levee improvements, modified as required, and 
channel stabilization at locations where levee setbacks 
are impossible or uneconomical. This act further authorized 
incorporation of several separate existing projects 
for flood damage prevention along Red River 
below Denison, above jurisdiction of the MRC, into this 
project. By Public Law 780, 83d Cong., 2d sess., as 
amended by Public Law 218, 84th Cong., 1st sess., and 
Public Law 645, 86th Cong., 1st sess., plan of improvement 
was amended to include additional projects as 
indicated in following lists of reservoirs and local 
protection works considered in general flood control 
plan for the Red River below Denison Dam, and 
existing flood control projects incorporated into project 
in Vicksburg District. (See Table 12-H for new projects 
and Table 12-I for incorporated projects.) 
Local cooperation. See individual reports herein. 
15. RED RIVER BELOW DENISON 
DAM, LEVEES AND BANK 
STABILIZATION 
(VICKSBURG DISTRICT) 
Location. Along the main stem of the Red River from 
the head of the levee system immediately above Index, 
Ar, through the southwest corner of Arkansas to the 
vicinity of Boyce, LA, on the right bank, and Pineville, 
LA, on the left bank. 
Existing project. Raising and strengthening existing 
and authorized Red River levees to provide protection 
against flooding and bank protection works at 
locations where levee setbacks are impossible or uneconomical. 
The plan consists of raising and strengthening 
existing and authorized Red River levees to provide 
against a flood approximately 20 percent greater than 
the flood of 1945, the flood of record, as modified by 
authorized reservoirs. Bank protection works are to 
be constructed at locations where levee setbacks are 
impossible or uneconomical. Estimated cost for new work 
(October 1984) is $59,650,000 Federal and $1,560,000 non- 
Federal. 
Local cooperation. Requirements of local cooperation 
are fully described on page 12-10 of FY 1984 
Annual Report. 
Operations and results during fiscal year. Hired 
labor forces continued investigations, surveys, and 
preparation of plans and specifications. The Belcher 
realignment, river miles 299-306, and the Gahagan 
revetment, mile 225-L were completed. 
Condition as of Sep. 30. Construction was initiated 
in February 1948 and the levees are complete and bank 
stabilization is 98 percent complete. 
16. RED RIVER WATERWAY 
SHREVEPORT, LA, TO 
INDEX, AR 
Location. In northwest Louisiana, southwest Arkansas, 
and northeast Texas, along the Red River between 
Shreveport, LA, and Index, AR. 
Existing project. To provide for realigning the 
channels of Red River from Shreveport, LA, to the levee 
system near Index, AR, by means of dredging, cutoffs, 
and training works and for stabilizing its banks by 
means of revetments, dikes, and other methods. Facilities 
to provide opportunities for recreation and for fish 
and wildlife development are an integral part of the 
project. Estimated cost for new work (October 1985) 
is $217,000,000 Federal and $27,500,000 non-Federal. 
Local cooperation. Requirements and assurances of 
local cooperation are fully described on pages 12-10 
and 12-11 of Fiscal Year 1984 Annual Report. 
Operations and results during fiscal year. Hired 
labor forces continued reevaluation studies. 
Condition as of Sep. 30. Construction has not been 
initiated. Completion of a General Re-evaluation Study 
will be required prior to construction of the project. 
The engineering and economic feasibility of constructing 
the authorized project must be reviewed in 
light of changed conditions within the project area. 
17. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Inspection of completed work was accomplished at 
a cost of $214,565 for the fiscal year. Total cost as of 
Sep. 30, 1986, is $1,965,093. 
12-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
18. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency flood control activities-repair, flood 
fighting, and rescue work. (Public Law 99, 84th 
Cong., and antecedent legislation.) 
Disaster preparedness, FY costs for the period were 
$286,675. 
Rehabilitation, total expenditures during FY 86 
amounted to $646,838 which included work on the Red 
River below Denison Dam. 
Advance measures, FY 87 costs were $4,079. 
Total Public Law 99 cost during FY 87 was $937,592. 
Snagging and clearing of navigable streams and 
tributaries in the interest of flood control (Sec. 208 
of 1954 Flood Control Act, Public Law 780, 83d 
Cong.). 
No activity during the period. 
Emergency bank protection (Sec. 14 of 1956 
Flood Control Act, Public Law 780, 83d Cong.). 
Total FY 87 costs for emergency bank protection 
work was $1,155. 
Flood control activities pursuant to Sec. 205, 
Public Law 858, 80th Cong., as amended (preauthorization). 
During FY 1987, detailed studies were completed 
on Canal 43, Desha and Lincoln Counties, AR, at a 
cost of $1,333 and Three Mile Creek, Jackson, MS at 
a cost of $5,671. 
Detailed studies continued on Bayou Natchitoches, 
LA, at a cost of $79,151; Pearl-Flowood, MS $5,507; 
Lead Bayou, $59,619; and Canal 43, $1,333. 
12-8

VICKSBURG, MS, DISTRICT 
TABLE 12-A COST AND FINANCIAL STATEMENT 
See 
Section Total Funds to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
1. Ouachita and Black New Work 
Rivers below Cam- Approp. 
den, AR (6.5-foot Cost 
navigation project) 
Ouachita and Black New Work 
Rivers below Cam- Approp. 
den, AR (9-foot Cost. 
navigation project) Maint. 
Approp. 
Cost 
2. Red River 
Emergency Bank 
Protection 
(Contrib. Funds) 
3. Red River 
Waterway 
Mississippi 
River to Shreveport, 
LA 
(Contrib. Funds) 
4. Yazoo River, MS 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
12,700,000 
14,599,659 
4,486,300 
4,962,300 
4,000,000 
8,662,235 
4,962,000 
4,855,884 
6,098,000 
7,064,032 
3,375,000 
3,495,000 
5,630,000 7,000,000 1,270,000 
3,779,352 5,878,490 3,073,870 
91,313,000 87,090,000 91,585,000 
91,266,477 81,574,966 65,955,521 
-122,000 
169,900 
142,171 
186,237 
80,000 
80,927 
-66,000 
1,892,000 
1,537,703 
1,602,515 
861,437 
10,000 
64,744 
1,580,000 
1,864,677 
154,936 
153,230 
-147,000 
74,782 
66,200 
66,200 
7,814,000 
8,537,018 
5,235,000 
5,033,649 
2,355,000 
3,497,107 
68,000,000 398,724,000 
77,210,592 374,463,716 
1,121,100 
1,117,843 
3,000 
2,479 
6. Bayou Bartholomew New Work 
and Tributaries Approp. 
AK and LA Cost 
7. Bayou Bodcau 
and Tributaries, 
AR and LA 
8. Lead Bayou, 
MS 
9. Ouachita River 
Levees, LA 
11. Pearl River 
Vicinity of 
Jackson 
12. Pearl River, 
Slidell, St. Tammany 
Parish, LA 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
400,000 
331,125 
15,000 
162,003 
265,000 
445,448 
200,000 
234,820 
710,000 1,195,000 
43,737 1,820,453 
0 
187,980 
0 
2,428 
21,217 
15,000 437,000 
- 264,524 
-116,000 
72,417 
631,000 
372,065 
14,000 
69,619 
176,000 
175,956 
97,500 
116,973 
413,000 
232,288 
12-9 
5,248,6191 
5,248,6191 
224,436,000 
220,778,318 
74,373,467 
74,098,213 
19,617,0002 
18,269,220 
6,825 
6,825 
4,996,1003 
5,200,1653 
2,547,3563 
1,787,5043 
9,679,661 
9,341,826 
1,197,515 
1,196,781 
974,000 
974,000 
1,038,000 
1,037,952 
631,000 
372,065 
1,824,000 
1,822,799 
2,682,000 
2,682,000 
2,081,000 
2,061,363 
97,500 
116,973 
865,000 
496,812

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 12-A 
(CONTINUED) 
COST AND FINANCIAL STATEMENT 
See 
Section Total Funds to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
13. Porter Bayou, New Work 
MS Approp. -15,000 - - - 1,035,278 
Cost 270,363 5,391 - - 1,029,257 
15. Red River below New Work 
Denison Dam, Approp. 1,600,000 1,000,000 957,000 -963,000 8,254,700 
Levees and Bank Cost 1,356,651 1,871,520 2,286,507 185,772 7,206,089 
16. Red River Water- New Work 
way, Shreveport, Approp. 90,000 50,000 - - 140,0003 
LA, to Index, AR Cost 88,730 48,736 13,684 - 155,4853 
1. Includes $674,068 for new work on previousprojects. 
2. Includes $3,312,000 PL 98-8 Jobs Bill. Excludes 
$47,854,000 previously allocated to New Orleans District. 
3. Excludes New Orleans District allocation and cost. 
12-10

VICKSBURG, MS, DISTRICT 
TABLE 12-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
May 17, 1950 
Jul. 14, 1960 
Dec. 31, 1970 
Aug. 13, 1968 
Aug. 13, 1968 
Mar. 3, 1875 
Aug. 13, 1968 
Nov. 17, 1986 
Nov. 17, 1986 
May 17, 1950 
Nov. 7, 1966 
Oct. 27, 1965 
OUACHITA AND BLACK RIVERS BELOW CAMDEN, 
AR (See Section 1 of Text) 
Modification of existing project to provide for 9-foot channel and 
deepening canal to Felsenthall, AR. 
Modification of 9-foot project to provide four new locks and 
dams and channel improvements. 
Migratory waterfowl refuges on Bayou D'Arbonne in connection 
with the pool of the Columbia Lock and Dam and in the pool of 
the Felsenthal Lock and Dam. 
RED RIVER EMERGENCY BANK PROTECTION (See 
Section 2 of Text) 
Realining the banks by dredging cut-offs and training works 
and stabilizing banks by means of revetments and dikes. 
RED RIVER WATERWAY-MISSISSIPPI RIVER TO 
SHREVEPORT, LA (See Section 3 of Text) 
Develop a 9 by 200 feet, approximately 236 miles long from Mississippi 
River at junction of Old River via Old River and Red 
River to Shreveport, LA, consisting of realinement, bank stabilization, 
and construction five locks and dams. 
YAZOO RIVER, MS (See Section 4 of Text) 
Removal of obstructions to navigation from mouth to Greenwood, 
MS, 189 miles. 
Nine-foot channel from mouth to Greenwood, mile 154.9 (persent 
mileage), with a lock and dam near Vicksburg, channel 
improvements, alteration of bridges, additional storage space 
in Sardis Lake to augment low river flows, and recreation 
features. 
Authorized intermittent dredging and such other work as may 
be required on the Yazoo River in MS, from Greenwood south, 
to remove natural shoals so as to allow commerce to continue. 
The authorized navigation project is modified to provide that 
the Federal share of the cost of the alteration of the Shepardstown 
Bridge (mile 147.8) shall be 50 percent. 
BAYOU BARTHOLOMEW, AR AND LA (See Section 6 of 
Text) 
Authorized channel improvements on Bayou and Tributaries 
(see above). 
Modified 1950 authorization to include 10 lakes in the west 
escarpment in Arkansas and 6 local levees in Louisiana, and 
acquisition of lands for mitigation of fish and wildlife losses. 
The previously authorized channel improvement was deferred 
until it is determined that the quality and quantity of water 
downstream will not be adversely affected. 
BAYOU BODCAU AND TRIBUTARIES, AR AND LA (See 
Section 7 of Text) 
Extend Cypress Bayou-Red Chute Bayou levee construct 
stream closure landside drainage channel and three culverts 
on Red Chute Bayou, and clearing and snagging channel; 
extend Flat River-Loggy Bayou levee, close Flat River near 
3unction with Cutoff Bayou, and construct control structures on 
Flat River near junction with Red Chute Bayou; and enlarge 
Flat River channel to 20 to 35 feet, a distance of 11.6 miles. 
S. Doc. 117, 81st Cong., 1st 
sess. 
S. Doc. 112, 86th Cong., 2d 
sess. 
Report of the Chief of Engineers 
dated Nov. 25, 1970, 
and H. Doc. 92-109, 92d 
Cong., 1st sess. 
H. Doc. 304, 90th Cong., 2d 
sess. 
H. Doc. 304, 90th Cong., 2d 
sess. 
H. Doc. 342, 90th Cong., 2d 
sess. 
Public Law 99-662, 99th 
Cong., 2d sess. 
Public Law 99-662, 99th 
Cong., 2d sess. 
S. Doc. 117, 81st Cong., 1st 
sess. 
H. Doc. 506, 98th Cong., 2d 
sess. 
H. Doc. 203, 89th Cong., 1st 
sess. 
12-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 12-B 
(CONTINUED) 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Nov. 17, 1986 
Jun. 30, 1948, as 
amended 
Nov. 17, 1986 
May 17, 1950 
Jul. 14, 1960 
Jun. 13, 1983 
Jul. 29, 1983 
Aug. 15, 1985 
Nov. 17, 1986 
Nov. 17, 1986 
CANEY CREEK, MS 
Authorizes construction of such bank stabilization measures for 
Caney Creek in the vicinity of Jackson, MS, between McDowell 
Road and Raymond Road as the Secretary determines necessary 
for flood damage prevention and erosion control along 
approximately 3,000 feet of the creek. 
LEAD BAYOU, MS (See Section 8 of Text) 
Channel enlargement. 
MONROE AND WEST MONROE, LA, AND OUACHITA 
PARISH, LA 
Authorizes such structural and nonstructural measures as the 
Secretary deems feasible to prevent flood damage to the cities 
of Monroe and West Monroe, LA, and Ouachita Parish, LA. 
OUACHITA RIVER AND TRIBUTARIES, AR AND LA 
(See Section 10 of Text) 
Authorized DeGray Lake; Murfreesboro Lake; extension of 
floodwall at Monroe to partially close the existing gap; local 
protection at Bawcomville, LA (subsequently constructed 
under Sec. 6, Act of May 15, 1928, with local interests contributing 
one third of cost); Bayou Bartholomew channel 
improvement, including Deep Bayou and Overflow Creek; Pine 
Bluff local protection; local protection at Calion, AR; and incorporation, 
into the Ouachita River and Tributaries project, of all 
existing projects and portions thereof in the basin above the 
lower end of the levees on the east bank of the Ouachita River. 
In addition, the Chief of Engineers authorized on Nov. 14, 
1966, additional work on the levees. 
PEARL RIVER, MS AND LA (See Section 11 of Text) 
Construction of levee system and channel rectification, Pearl 
River, vicinity of Jackson, MS 
Accomplish the clearing and channel improvements at Hwy 35 
bridge on the Pearl River in the vicinity of Jackson, MS. 
Design and construct protection to prevent flooding along the 
Pearl River in the vicinity of Jackson, MS 
Planning, design engineering and construction of a levee system 
for Slidell LA, pending binding cost-sharing arrangements 
acceptable to the Secretary of the Army or under terms 
and conditions provided in subsequent legislation when 
enacted into law. 
Water Resources Development Act of 1986 authorized flood control 
project at Shoccoe, MS, as outlined in Report of Chief of 
Engineers dated March 17, 1986, and also several project features 
which would provide flood control to the upstream areas 
of the Pearl River Basin in MS. 
PEARL RIVER, SLIDELL, ST. TAMMANY PARISH, LA 
(See Section 12 of Text) 
Authorizes flood control improvements for Pearl River Basin, 
St. Tammany, LA, subject to a favorable Chief's report and 
approval by the Secretary of the Army for Civil Works. 
Public Law 99-662, 99th 
Cong., 2d sess. 
Sec. 205 of the Flood Control 
Act of 1948, as 
amended. Authorized by 
Chief of Engineers Jun. 
10, 1980. 
Public Law 99-662, 99th 
Cong., 2d sess. 
S. Doc. 117, 81st Cong., 1st 
sess. 
H. Doc. 441, 86th Cong., 1st 
sess. 
S. Doc. 153, 98th Cong., 1st 
sess. 
Public Law 98-63, 98th 
Cong., 1st sess. 
Public Law 99-88, 99th 
Cong., 2d sess. 
Public Law 99-662, 99th 
Cong., 2d sess. 
Public Law 99-662, 99th 
Cong., 2d sess. 
12-12

VICKSBURG, MS, DISTRICT 
TABLE 12-B 
(CONTINUED) 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Nov. 17, 1986 
Jun. 30, 1948, as 
amended 
Nov. 17, 1986 
Jul. 24, 1946 
Aug. 13, 1968 
Aug. 13, 1968 
PEARL RIVER BASIN, SHOCCOE DAM, MS 
Authorizes the Pearl River Basin, including Shoccoe, MS, for 
the construction of the Shoccoe Dam plus upstream flood control 
measures at east-central Leake County, south part of Carthage, 
MS, Highway 35 vicinity, upstream reservoirs on the 
Pearl River and upstream channels on the Pearl River and 
elsewhere in Leake County. 
PORTER BAYOU, MS (See Section 13 of Text) 
Selective snagging and clearing of Porter Bayou, MS from mile 
12.5 to mile 32.3 
RED RIVER WATERWAY, LA 
Water Resources Development Act of 1986 authorized for construction 
the project for mitigation of wildlife losses, Red River 
Waterway, LA, which may include all or such portion of any 
land adjacent to the Loggy Bayou Wildlife Management Area. 
RED RIVER BELOW DENISON DAM LEVEES AND 
BANK STABILIZATION (VICKSBURG DIST.) (See Section 
15 of Text) 
Levee and bank stabilization. 
Deauthorization of Morringsport Dam and Reservoir on Cypress 
Creek; realining and stabilizing the banks of the Red River; 
and recreational facilities from the Mississippi River to Denison 
Dam, OK and TX. 
RED RIVER WATERWAY-SHREVEPORT, LA, TO 
INDEX, AR (See Section 16 of Text) 
Provides for realinement of the channels of the Red River from 
Shreveport, LA, to Index, AR. 
Public Law 99-662, 99th 
Cong., 2d sess. 
Sec. 205 of the Flood Control 
Act of 1948, as 
amended. Authorized by 
Chief of Engineers, Feb. 
18, 1982. 
Public Law 99-662, 99th 
Cong., 2d sess. 
H. Doc. 602, 79th Cong., 2d 
sess. 
H. Doc. 304, 90th Cong., 2d 
sess. 
H. Doc. 304, 90th Cong., 2d 
sess. 
12-13 
- --

TABLE 12-C OUACHITA AND BLACK RIVERS, AR AND LA 
(9-FOOT PROJECT), LOCKS AND DAMS 
(See Section 1 of Text) 
Min. 
Depth 
Greatest on 
Available Lower 
Miles Length Max. Elev. Miter 
Above Width for Full Lift Normal Sill at 
Miles Mouth of Width at Pool Normal Pre- Total 
from of Lock of Lock Low Surface Pool Character cent Estimated 
Nearest Black Chamber Chamber Water (feet Level or Kind of Type of Com- Project 
Location Town River (feet) (feet) (feet) msl) (feet) Foundation Dam Construction plete Cost 
Jonesville, LA 10 25 84 600 30 34 14 Piling Moving Tainter gated dam; 1002 $ 43,100,000 
bascule gated 
navigation pass; 
steel mitering lock 
gates 
Columbia, LA 5 117 84 600 18 52 13 do do Tainter gated dam; 952 44,300,000 
fixed crest 
navigation pass; 
steel mitering lock 
gates 
Felsenthal, AR 1 227 84 600 18 701 13 Earth do Tainter gated dam; 882 99,300,000 
navigation pass 
with inflatable 
dam on crest; steel 
mitering lock 
gates 
Calion, AR 7 283 84 600 12 77 13 do do Tainter gated dam; 882 71,300,000 
H. K. hinged crest gated 
hatcher) navigation pass; 
steel mitering lock 
gates 
Estimated Federal Cost $258,000,000 
Estimated Non-Federal Cost 16,702,000 
Total Estimated Cost $274,702,000 
1. Fish and wildlife impoundment level. Navigation pool 2. The percent complete reflects all work within the pool. 
elevation .65. 
L'J 
O
mA
O
O
Lu] 
0
Au 
0I
0
O
0o

VICKSBURG, MS, DISTRICT 
TABLE 12-D OTHER AUTHORIZED NAVIGATION PROJECTS 
Cost to Sep. 1987 
For Last 
Full Report Operation 
See Annual and Mo. and Yr. 
Project Status Report For: Construction Maintenance Completed 
Bayou Bartholomew, LA and AR1, 2 , 3, 4 - 1931 $ 45,874 $ 42,857 1 
Bayous D'Arbonne and Corney, LA1, 2, 4 - 1941 19,000 37,804 1 
Big Black River, MS 1, 4, 5 - 1895 15,000 - 1 
Big Sunflower River, MS 1, 4, 6, 7 - 1942 560,027 459,328 1 
Boeuf River, LA1, 3, 4, 7, 8, 9 - 1949 30,000 103,737 1 
Claiborne County Port, MS - 1985 2,000,000 2,000,000 1 
Cypress Bayou and Waterway between 
Jefferson, TX, and Shreveport, LA15 Complete 1971 202,817 452,611 Dec. 1914 
Homochitto River, MS 4 - 1910 15,482 8,518 1 
Lake Providence Harbor, LA - 1985 208,537 2,586,573 15 
Little Missouri River, AR1, 4, 5 - 1873 19,992 - 1 
Little River, LA1, 4, 5, 10 - 1890 1,500 - 1 
Little Tallahatchie River, MS 1'7 - 1913 19,000 - 1 
Madison Parish Port, LA - 1985 655,999 529,031 1 
Mouth of Yazoo River, MS 1, 7,11 - 1953 1,179,211 217,266 1 
Ouachita and Black Rivers, AR and LA,12_1 
Felsenthal Canal 193712 1 
Overton-Red River Waterway, LA - 1985 - -350,500 1 
Pearl River, MS - 1985 1,354,400 1,306,423 1 
Red River below Fulton, AR1, 16,17,18 - 1978 1,963,806 2,147,890 1 
Red River Waterway 
LA, AR, OK, and TX1, 17, 18 - 1969__1 
Red River Waterway, Shreveport, LA 
to Daingerfield, TX 1976 70,000 - 1 
Removing snags and wrecks from - 1948 - 272,500 1 
Mississippi River below mouth of 
Missouri River and from 
Old and Atchafalaya Rivers 11 
Rosedale Harbor, MS - 1985 2,000,000 1,829,480 1 
Saline River, AR1, 3, 4, 5 - 1931 26,900 12,792 1 
Tallahatchie and Coldwater 
Rivers, MS 1 4 5 -1939 43,481 173,066 1 
12-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 12-D 
(CONTINUED) 
OTHER AUTHORIZED NAVIGATION PROJECTS 
Cost to Sep. 1987 
For Last 
Full Report Operation 
See Annual and Mo. and Yr. 
Project Status Report For: Construction Maintenance Completed 
Tensas River and Bayou 
Macon, LA1, 8, 12 1949 38,367 85,352 1 
Yalobusha River, MS 1,4 5, 14 - 1937 7,000 15,936 1 
1. Status and Date unavailable. 
2. Abandonment recommended in H. Doc. 1962, 64th 
Cong., 2d sess., and H. Doc. 467, 69th Cong., 1st sess. 
3. Channels adequate for existing commerce. 
4. Inactive project. No commerce. 
5. Abandonment recommended in H. Doc. 467, 69th 
Cong., 1st sess. 
6. Project curtailment recommended by elimination of 
work between Pentecost and mouth of Hushpuckena River. 
(Abandonment of entire project erroneously recommended 
in H. Doc. 467, 69th cong., 1st sess.) 
7. See report of Mississippi River Commission for operations 
in connection with Yazoo Basin. 
8. Report of New Orleans District, pp. 919-920 for 
Fiscal Year 1949. 
9. Project curtailment recommended by elimination of 
work above Girard, LA (Abandonment of entire project 
recommended erroneously in H. Doc. 467, 69th Cong., 1st 
sess.)
10. Due to decline of traffic, local interests not 
sufficiently interested to provide rights-of-way and dumping 
privileges. 
11. No additional funds available under this project. 
Work is being carried on under appropriation flood control, 
Mississippi River and tributaries. 
12. Year authorized. 
13. Inactive. Channel adequate for commerce. 
14. See report of Mississippi River Commission for 
operations in connection with Yazoo Basin flood control 
project including channel clearing and rectification and 
Grenada Lake on Yalobusha River. 
15. Excludes $50,000 contributed funds. 
16. Includes $1,553,878 for previous projects. 
17. Incorporated in the project "Red River Waterway- 
Mississippi River Shreveport, LA" Sept. 30, 1976. 
18. Emergency bank protection on this project is 
reported separately as "Red River Emergency Bank 
Protection." Two reaches, "Red River Waterway-Mississippi 
River to Shreveport, LA" and "Red River Waterway- 
Shreveport, LA, Daingerfield, TX," are also reported 
separately. 
12-16

VICKSBURG, MS, DISTRICT 
TABLE 12-E OUACHITA RIVER AND TRIBUTARIES: 
EXISTING PROJECT 
(See Section 10 of Text) 
For Last Estimated 
Full Report Federal 
See Annual New Work 
Project Report for: Cost 
Blakely Mt. Dam-Lake Ouachita, AR 1985 $ 44,100,000 
DeGray Lake, AR 1985 72,034,0002 
Narrows Dam-Lake Greeson, AR 1985 20,900,000 
Calion, AR 1960 970,9963 
Columbia, LA 1941 204,7403 
Existing levees and extensions thereto from Bastrop, LA, to mouth of 
Boeuf River and at West Monroe, LA 1961 3,025,1813 
Little Missouri River below Murfreesboro, AR 1957 354,8023 
Ozan Creek, AR 1957 57,7423 
Terre Noire Creek, AR 1948 123,7003 
Pine Bluff, AR, local protection 1954 172,5823 
Monroe, LA, floodwall extension (Plan B) 1984 2,561,0003 
Bayou Bartholomew and Tributaries, AR and LA (1) 44,800,000 
Ouachita River Levees (additional work) (1) 9,400,000 
Total $198,704,7434 
1. See individual reports herein. 
2. Includes $5,800,000 for water supply, to be 
reimbursed by local interests. 
3. Actual cost of completed project. 
4. Excludes the authorized Murfreesboro Lake, AR, 
project, which is inactive. The latest estimated cost (1954) 
was $4,190,000. 
12-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 12-F RED RIVER BELOW DENISON DAM 
(VICKSBURG DISTRICT): NEW PROJECTS 
(See Sec. 14 of Text) 
Drainage Conserva- Flood 
Area tion Control Estimated 
(square Storage (acre- Federal 
Project Stream miles) (acre-feet) feet) Cost 
Bayou Bodcau and tributaries, AR2 and LA - 1,158 - - $25,100,0003 
Bayou Nicholas-Coushatta, LA - - - - 70,7174 
Bayou Pierre in vicinity of Shreveport, LA5 - - - - 243,3363 
Caddo Lake, LA' Caddo Lake - - - 3,586,000 
Campti-Clarence Area in 
Natchitoches Parish, LA Red River - - - 1,950,0003 
Garland City, AR 16 - - - - 1,450,000' 
Maniece Bayou, AR - - - - 970,0323 
McKinney Bayou, AR7 8 - - - - 5,610,0003 
Posten Bayou, AR and LA2 6 69 - - - - 560,000 
Red River below Denison Dam levees 
and bank stabilization, TX, AR and LA1,3 - - - - 59,650,0003 
Total 99,191,885 
1. Details presented in individual report herein. 
2. Construction on this project not started. 
3. In addition, non-Federal funds are: 
Bayou Bodcau and tributaries, AR and LA ........................................................ $5,300,000 
Bayou Pierre in vicinity of Shreveport, LA (cash contribution)...........................................89,047 
Caddo Lake, LA ...................................................................................... 28,000 
Campti-Clarence Area in Natchitoches Parish, LA ..................................................... 480,000 
East Point .......................................................................................... 67,000 
G arland City, A R ...................................................................................... 6,000 
M aniece Bayou, AR (cash contribution) ............................................................... 18,000 
McKinney Bayou, AR (cash contribution) ............................................................ 508,000 
Red River below Denison Dam, levees and bank stabilization, TX, AR, and LA ....................... 1,560,000 
4. For last full report, see Annual Report for 1964. 
5. For last full report, see Annual Report for 1951. 
6. Inactive. 
7. Includes $4,330,200, Code 711, and $399,739 accelerated Public Work funds. 
8. Joint-use pool (sediment). 
9. Deauthorized by resolution Dec. 17, 1970, which also authorized new project "Posten Bayou, AR," under provision of 
Sec. 201 of Flood Control Act of 1965. 
12-18

VICKSBURG, MS, DISTRICT 
TABLE 12-G RED RIVER BELOW DENISON DAM 
(VICKSBURG DISTRICT): INCORPORATED PROJECTS 
(See Sec. 14 of Text) 
For Last 
Flood Estimated Full Report 
Control Federal See Annual 
Project Type of Work Act Cost Report For 
Aloha-Rigolette Area, Grant and Rapides 
Parishes, LA Levee and appurtenances 1941 $ 1,653,2371 1956 
Bayou Bodcau Reservoir, LA2 Flood-control reservoir 1938 5,120,7401 4 
Bayou Bodcau, Red Chute, and 
Loggy Bayou, LA Channel improvement 1941 319,2001 1948 
Bayou Pierre, LA Channel enlargement 1936 255,5291 4 
Black Bayou Lake, LA5 ' 6 Flood-control reservoir 1936 714,000 1945 
Colfax Grant Parish, LA Cutoff 1938 70,3481, 7 1938 
Grant Parish, below Colfax, LA Levees 1938 38,8091 1941 
Hempstead County levee district 
No. 1, AR Levee enlargement 1938 88,0061 1941 
Natchitoches Parish, LA Levee and appurtenances 1936 1,529,9271, 8 1956 
Pineville, Red River, LA Levee and appurtenances 1941 232,4261 1953 
Red River in vicinity of 
Shreveport, LA Bank protection 1944 3,908,0001 1953 
Red River Parish, LA Levee enlargement 1936 149,4351 1939 
Saline Point, LA Cutoff 1936 124,1111 1945 
Wallace Lake, LA Flood-control reservoir 1936 1,219,3711, 3 4 
Total $15,467,134 
1. Actual cost. 
2. Project transferred to Vicksburg District August, 
1982.
3. Includes amounts indicated for recreational facilities 
under Code 711, Bayou Bodcau Reservoir, LA, $1,027,000; 
Wallace Lake, LA, $17,164. 
4. Included in this report. 
5. Work not started. 
6. Inactive. 
7. Completed under provisions of Sec. 7 of Flood Control 
Act of 1928, as amended by Sec. 9 of Flood Control Act of 
1936, and included in 1939 Annual Report of President, 
Mississippi River Commission, p. 2214. 
8. In addition, $25,000 was expended from contributed 
funds. 
12-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 12-H OTHER AUTHORIZED 
FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 1987 
Mo. and Yr. Full Report Operation Mo. and Yr. 
If See Annual and If 
Project Deauthorized Report For: Construction Maintenance Completed 
Aloha-Rigolette Area, Grant and 
Rapides Parishes, LA' 
Bayou Bodcau, Red Chute, and 
Loggy Bayou, LA1 
Bayou Bodcau Reservoir, LA 
Bayou Pierre, LA 
Bayou Pierre in vicinity of 
Shreveport, LA1, 2 
Big Black River, MS3 
Big Choctaw Bayou, LA3, 4 
Black Bayou Reservoir, LA1, 5, 6 
Blakely Mt. Dam - Lake 
Ouachita, Ouachita River, AK 
Buffalo River, MS7 
Caddo Lake Dam, LA 
Campti-Clarence Area in 
Natchitoches Parish, LA 
Colfax, Grant Parishes, LA1 8 
DeGray Lake 
Caddo River, AR 
East Point, LA 
Garland City, AR 
Grant Parish below Colfax, LA1, 3 
Hempstead County Levee District 
No. 1, AR 1 3 
Homochitto River, MS 3 
Maniece Bayou, AR 1, 2 
McKinney Bayou Finn Bayou 
Segment, ARU 
Monroe Floodwall, LA 
Murfreesboro Dam and Lake 4 
Narrows Dam-Lake Greeson, 
Little Missouri River, AK 
Natchez Port Area, MS 3 , 4 
Natchitoches Parish, LA1, 2 
Pearl River, Jackson-East 
Jackson, MS 
Pineville, Red River, LA3, 4 
Posten Bayou, AR' � 
Poverty Point, LA 
Red River Parish, LA1,3 
Nov. 1986 
Aug. 1977 
1956 
1948 
1985 
1985 
1951 
1956 
1966 
1945 
1985 
1940 
1986 
1978 
1938 
1985 
1969 
1976 
1941 
1941 
1956 
1970 
19639 
1984 
1951 
1985 
1969 
1956 
1986 
1953 
1973 
1986 
1939 
$ 1,653,189 
319,200 
243,3362 
910,185 
248,823 
34,023,108 
$ - 
2,208,190 
83,866 
670,750 
Apr. 1955 
Jan. 1948 
Apr. 1961 
FY 1939 
Jun. 1939 
3
3 
47,108,075 Oct. 1955 
621,858 
1,655,700 
70,348 
72,033,992 
286,069 
1,335,841 
38,809 
88,006 
205,000 
970,9322 
2,560,000 
16,516,689 
538,000 
1,529,478 
290,000 
232,426 
250,000 
149,435 
- Jul. 1978 
31,092,018 Dec. 1971 
144,650 
Aug. 1968 
Jul. 1974 
3
3
3 
Aug. 1969 
33,663,952 May 1950 
- 5 
- Aug. 1955 
Dec. 1951 
Oct. 1985 
3 
12-20

TABLE 12-H 
(CONTINUED) 
VICKSBURG, MS, DISTRICT 
OTHER AUTHORIZED 
FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 1987 
Mo. and Yr. Full Report Operation Mo. and Yr. 
If See Annual and If 
Project Deauthorized Report For: Construction Maintenance Completed 
Red River in vicinity of 
Shreveport, LA1 1953 3,908,000 - Mar. 1953 
Saline Point, LA 1, 3 1945 124,111 
Twelvemile Bayou, LA4 1966 335,433 - May 1965 
Wallace Lake, LA 1985 - 571,890 Dec. 1946 
1. Authorized under project "Red River Below Denison 
Dam." 
2. In addition, the following was expended from contributed 
funds: 
Amite River and tributaries ............ $ 430 
Bayou Pierre in vicinity of 
Shreveport, LA .................... 89,047 
Choctaw Bayou and Tributaries, LA .... 170,799 
Harvey Canal, Bayou Barataria Levee, 
LA ............................... 425,209 
Maniece Bayou, AR ................... 39,293 
Natchitoches Parish, LA ............... 250,000 
3. Completion Date Unavailable. 
4. Authorized by Chief of Engineers under authority 
of Sec. 205 Flood Control Act of 1948, as amended. 
5. donstruction not initiated. 
6. Inactive. 
7. Deauthorized by Sec. 1002, Water Resources Development 
Act of 1986. 
8. Completed under provisions of Sec. 7 Flood Control 
Act of 1928, as amended by Sec. 9, Flood Control Act 1936, 
and included in 1939 Annual Report of President, Mississippi 
River Commission, p. 2214. 
9. Date authorized. 
10. Posten Bayou Project, authorized by Senate and 
House Resolutions, Dec. 17 and 15, 1970, deleted the plan 
authorized by the Flood control Act dated Aug. 3, 1955. 
12-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 12-I ACTIVE GENERAL INVESTIGATIONS 
(96x3121) 
Federal Cost Totals by 
Item and CWIS Number FY 87 Categories 
SURVEYS (Category 100) ($) ($) 
Flood Control Studies (120) 
Ouachita River Basin AR & LA -12046 $ 574,934 
Pearl River Basin, MS and LA -12234 666,938 
Pine Bluff Metro, AR -12015 0 
Subtotal 1,241,872 
Comprehensive Studies (150) 
Red River Below Denison Dan (153) -81129 102 
Miscellaneous Activities (170) 
Special Investigations (171 -17250 19,943 
Review of FERC Licenses 172) -53857 1,934 
Subtotal 21,877 
Coordination Studies with Other Agencies (180) 
Department of Agriculture, Soil Conservation Seryice (181) -51840 2,001 
Planning Assistance to States (186) -51850 0 
Technical and Engineering Assistance on Shoreline 
and Streambank (188) -51731 0 
Subtotal 2,001 
TOTAL (Category 100) 1,265,852 
COLLECTION AND STUDY OF BASIC DATA (Category 200) 
Inspection of Dams (230) 
Inventory of Dams 0 
Flood Plain Management Services (250) 
Flood Plain Management Services 177,819 
Hydrologic Studies (260) 
Hydrologic Studies (260) -53820 11,074 
Subtotal 188,893 
TOTAL (Category 200) 188,893 
CONTINUATION OF PLANNING & ENGINEERING (Category 400) 
Flood Control Projects (450) 
Pearl River, Slidell, LA (451)-12442 168,946 
Pearl River, Shoccoe Dam, MS (452)-12444 472,450 
Subtotal 641,396 
TOTAL (Category 400) 641,396 
ADVANCE E&D (Category 600) 
Navigation Projects (620) 
Locks and Dams, Yazoo River, MS (622) 
00083 0 
Flood Control Projects (650) 
Local Protection, Red River Waterway, 
Shreveport to Index (651) -75023 344,324 
Local Protection, Pearl River Vicinity 
of Jackson, MS (651) -75426 431 
Reservoirs Pearl River Shoccoe Dam, MS (652) -12444 585,088 
Subtotal 929,843 
TOTAL (Category 600) 929,843 
GRAND TOTAL GENERAL INVESTIGATIONS $3,025,984 
12-22

MEMPHIS, TN, DISTRICT* 
This district comprises a portion of southeastern 
Missouri and southern Illinois, western portions of 
Kentucky and Tennessee, a small portion of northern 
Mississippi, and the northeastern portion of Arkansas; 
includes area embraced in drainage basins of eastern 
tributaries of the Mississippi River south of Ohio River 
Basin to Nonconnah and Horn Lake Creeks, inclusive, 
and those of western tributaries south of Little River 
diversion channel and Commerce, MO, including St. 
Francis River Basin and White River and tributaries 
below Peach Orchard Bluff, AR, on the right bank and 
below Augusta, AR, on the left bank; also includes left 
bank Mississippi River levee from vicinity of Memphis 
south to about mile 620, and right bank levees from 
Cape Girardeau, MO, to about mile 605. 
IMPROVEMENTS 
Navigation 
1. Navigation work under special 
authorization ........................ 
Flood Control 
2. Hatchie River, Alcorn Co, MS ........ 
3. Humboldt, TN ...................... 
4. Nonconnah Creek Interceptor Sewer, 
M emphis, TN ....................... 
5. Turner Creek, Corinth, MS ........... 
6. Inspection of completed flood control 
projects ............................ 
Page Flood Control (cont.) 
7. Flood control work under special 
13-1 authorization ....................... 
Tables 
13-1 Table 13-A 
13-2 Table 13-B 
Table 13-C 
13-2 
13-2 
13-3 
Table 13-D 
Table 13-E 
Cost & Financial Statement .... 
Authorizing Legislation ...... 
Other Authorized Navigation 
Projects ..................... 
Other Authorized Flood Control 
Projects ..................... 
Active General Investigations .. 
Page 
13-3 
13-4 
13-4 
13-5 
13-6 
13-7 
Navigation 
1. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Sec. 107, Public 
Law 86-645, as amended (preauthorization). 
During this period $26,137 was expended on reconnaissance 
studies on DeValls Bluff Harbor, AR. 
Flood Control 
2. HATCHIE RIVER, ALCORN 
COUNTY, MISSISSIPPI 
Location. The project is located in Alcorn County in 
northeast Mississippi, along the Hatchie River 5 miles 
upstream of U.S. Highway 72. 
Existing project. Authorized under the authority of 
Section 208 of the 1954 Flood Control Act. The project 
consists of removal of a 1,000-foot-long massive logjam 
where the Hatchie River channel was completely 
blocked and stream flows were diverted into the 
adjacent bottomland hardwood forests. Timber will be 
restored or preserved on over 1,100 acres of valuable 
forests. 
Local cooperation. Provide without cost to the 
United States all lands, easements, and rights-of-way 
necessary for the construction, operation and maintenance 
of the project and all necessary modifications 
or relocations of roads, bridges, and utilities other than 
railroad bridges and bridge approaches; to the extent 
of the legal authority of the Hatchie Drainage District 
of Alcorn County, hold and save the United States free 
from all damages arising from the construction and 
operation of the completed works, except those 
damages due to the sole fault or negligence of the 
United States or its contractors; to the extent of the 
legal authority of the Hatchie Drainage District of 
Alcorn County, maintain and operate the completed 
works without cost to the United States in accordance 
with regulations prescribed by the Secretary of the 
13-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Army; prevent future encroachment which might 
interfere with proper functioning of the project for 
flood control after project construction; pay all costs 
associated with project features designated to be local 
interest responsibilities; assume full responsibility for 
all project costs in excess of the Federal cost limitation 
of $250,000; comply with the provisions of the Uniform 
Relocation Assistance and Real Property Acquisition 
Policies Act of 1970, Public Law 91-646; comply with 
the provisions of Section 221 of the Flood Control Act 
of 1970, Public Law 91-611; comply with the provisions 
of Section 601 of Title VI of the Civil Rights Act of 
1964 (Public Law 88-352) that no person shall be 
excluded from participation in, denied the benefits of 
or subjected to discrimination in connection with the 
project on the grounds of race, creed, or national 
origin. 
Local interests have furnished the required assurances. 
Condition as of Sep. 30. The channel blockage was 
removed in August 1985 and the remaining cleanup 
was completed in Feb. 1986. 
3. HUMBOLDT, TN 
Location. Humboldt is located in Gibson County, TN. 
Existing project. Authorized July 23, 1984, under 
the authority of Section 205 of the 1948 Flood Control 
Act, as amended. The project consists of clearing and 
snagging approximately 2,200 feet of existing channel 
and the construction of 2,600 feet of enlarged channel. 
The project will provide a 10-year level of protection 
for area residents and is expected to reduce average 
annual flood damages by 64 percent. The current 
estimated construction cost for the project is 
$1,110,000. The project assurances of local cooperation 
have been furnished. The construction contract for 
required channel improvement was awarded in July 
1986. It has been determined that no adverse 
environmental impacts will result from construction of 
the project. 
Local cooperation. Requirements of local cooperation 
are fully described on page 13-4 of FY 1984 
Annual Report. 
Condition as of Sep. 30. Channel work was completed 
Dec. 18, 1987. A contract for construction of 
a railroad drainage structure was awarded on June 
2, 1987. The work is expected to be completed in 
November 1987. 
4. NONCONNAH CREEK 
INTERCEPTOR SEWER, MEMPHIS, 
TENNESSEE 
Location. The project is located in southeastern 
Memphis, Tennessee, along the right (north) bank of 
Nonconnah Creek through a reach extending from 
about 600 feet upstream to 100 feet downstream of the 
Highway 78 (Lamar Ave.) bridge. 
Existing project. Authorized under the authority 
of Section 14 of the Flood Control Act of 1946. The 
project consists of providing bank protection along a 
700 foot reach of eroding creek bank to protect a major 
interceptor sewer line and the U.S. Highway 78 bridge. 
Protection is to be provided via grading and shaping 
the bank and armoring it with riprap stone. 
Local cooperation. Provide without cost to the 
United States all lands, easements, and rights-of-way 
necessary for construction of the project; provide 
without cost to the United States all necessary 
relocations and alterations of buildings and utilities, 
sewers, related and special facilities; to the extent of 
the legal authority of the City of Memphis, Tennessee; 
hold and save the United States free from all damages 
due to the construction, operation, and maintenance 
of the project, except damages due to the fault or 
negligence of the United States or its contractors; to 
the extent of the legal authority of the City of Memphis, 
Tennessee, maintain and operate the project works 
after completion without cost to the United States in 
accordance with regulations prescribed by the Secretary 
of the Army; comply with provisions of the Uniform 
Relocation Assistance and Real Property 
Acquisition Policies Act of 1970, Public Law 91-646; 
comply with the provisions of Section 221 of the Flood 
Control Act of 1970, Public Law 91-611; assume any 
construction costs in excess of $250,000, the monetary 
limit established in Section 27, Public Law 93-251; 
prevent future encroachment which might interfere 
with proper functioning of the project; if applicable, 
adjust all claims covering water rights; comply with 
the provisions of Section 601 of Title VI of the Civil 
Rights Act of 1964, Public Law 88-352. 
The city of Memphis, Tennessee has provided the 
required local cooperation assurances and rights-ofway. 
Condition as of Sep. 30. A contract for construction 
of the project was awarded on 30 September 1986. The 
work was completed on December 6, 1986. 
5. TURNER CREEK, CORINTH, 
MISSISSIPPI 
Location. The project is located in northcentral 
Mississippi in Alcorn County on the left and right banks 
of Turner Creek immediately downstream of Highway 
45B in Corinth, Mississippi. 
Existing project. Authorized under the authority 
of Section 14 of the Flood Control Act of 1946. The 
project consists of a timber retaining wall along 73 
feet of the right bank to control erosion which was 
threatening a city-owned community theater building 
and a 121-foot long left bank wall to protect a privatelyowned 
service station which might have been com- 
13-2

MEMPHIS, TN, DISTRICT 
promised due to deflection of flow from placement of 
the right bank wall. 
Local cooperation. Provide without cost to the United 
States all land, easements, and rights-of-way necessary 
for construction of the project; provide without 
cost to the United States all necessary relocations and 
alterations of buildings and utilities, sewers, related 
and special facilities; hold and save the United States 
free from all damages due to the construction, operation, 
and maintenance of the project, except damages 
due to the fault or negligence of the United States or 
its contractors; maintain and operate the project works 
after completion without cost to the United States in 
accordance with regulations prescribed by the Secretary 
of the Army; comply with provisions of the Uniform 
Relocation Assistance and Real Property Acquisition 
Policies Act of 1970, Public Law 91-646; comply 
with the provisions of Section 221 of the Flood Control 
Act of 1970, Public Law 91-611; assume any construction 
costs in excess of $250,000, the monetary limit 
established in Section 27, Public Law 93-251; prevent 
future encroachment which might interfere with 
proper functioning of the project; if applicable, adjust 
all claims covering water rights; comply with the 
provisions of Section 601 of Title VI of the Civil Rights 
Act of 1964, Public Law 88-352. 
The Tombigbee River Valley Water Management 
District provided the required local cooperation assurances 
and rights-of-way. 
Conditions as of Sep. 30. Construction was initiated 
on Sep. 29, 1986, and completed on March 20, 1987. 
6. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Inspected completed projects at a cost of $129,115 
in the period. Total cost as of Sep. 30, 1986, was 
$1,297,853. This included in-depth inspection of 
projects. 
7. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to Sec. 205, Public 
Law 858, 80th Cong., as amended (preauthorization). 
During this period $65,400 was expended on 
reconnaissance study on Ramsey Creek, Scott City, MO 
and $387 on Tuscumbia Rivers, MS. 
Emergency bank stabilization activities pursuant 
to Sec. 14, Public Law 526, 79th Cong., as amended. 
During FY 1987, $19,669 was expended on Perkins 
Street Bridge, Nonconnah Creek, Memphis, TN; $379 
on Quince Road Bridge, Nonconnah Creek lateral, 
Memphis, TN; and $546 on Fletcher Creek Stabilization, 
Memphis, TN. Monies on all of these projects were 
used to initiate reconnaissance studies pursuant to the 
authority. 
Emergency flood control activities - rehabilitation 
of private levee (Public Law 99, 84th Cong., 
and antecedent legislation). Federal cost was 
$251,150 for disaster preparedness in FY 87. This 
includes $11,003 for Phase I flood protection. 
Flood control activities pursuant to Sec. 208, 
Public Law 780, 83d Cong., as amended. No work 
was accomplished this period under this authority. 
13-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 13-A COST AND FINANCIAL STATEMENT 
See 
Section Total Funds to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
2. Hatchie River New Work 
Alcorn Co., MS Approp. $ - $ 62,676 $ 10,802 $ - $ 73,478 
Cost - 62,673 10,802 - 73,475 
3. Humboldt, TN New Work 
Approp. 155,000 - 333,333 707,000 1,195,333 
Cost 124,150 11,539 349,736 510,151 995,576 
4. Nonconnah Creek New Work 
Interceptor Approp. - - 30,000 204,000 234,100 
Sewer, Memphis, Cost - - 29,435 200,000 229,435 
TN 
5. Turner Creek New Work - - 
Corinth, MS Approp. - - 27,500 60,000 87,500 
Cost 27,500 67,743 95,243 
TABLE 13-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
HATCHIE RIVER (See Sec. 2 of Text) 
Sep. 24, 1954, Clearing and snagging within channel. Approved Jul 24, 19858 
as amended 
HUMBOLDT, TN (See Sec. 3 of Text) 
June 30, 1948, Channel improvement within the city of Humboldt. Approved Jul. 23, 19841 
as amended 
NONCONNAH INTERCEPTOR SEWER AND 
U.S. HIGHWAY 78 (See Sec. 4 of Text) 
Jul. 24, 1946, Stabilization - streambank caving. Approved Oct. 18, 19852 
as amended 
TURNER CREEK, CORINTH, MS 
Jul. 24, 1946, (See Section 5 of Text) Approved May 23, 19862 
as amended Stabilization - streambank caving. 
WHITE RIVER NAVIGATION TO BATESVILLE, AR 
Nov. 17, 1986 Dredge and maintain general navigation channel. Public Law 99-662, 
99th Congress 
1. Authorized under authority of Sec. 205 of the 1948 
Flood Control Act, as amended. 
2. Authorized under authority of Sec. 14 of the 1946 
Flood Control Act. 
3. Authorized under authority of Sec. 208 of the 1954 
Flood control Act, as amended. 
13-4

MEMPHIS, TN, DISTRICT 
TABLE 13-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sep. 1987 
Full Report Operation 
Mo. and Yr. See Annual and Mo. and Yr. 
Project Deauthorized Report For: Construction Maintenance Completed 
Caruthersville Harbor, MO - 1984 $768,992 $ 1,963,079 Dec 80 
Forked Deer River, TN, including South 
Fork1',2 - 1912 25,000 425,857 - 
Helena Harbor, AR - 1984 90,847 4,344,714 Sep 63 
Hickman Harbor, KY - 1984 149,827 3,739,720 Jan 63 
New Madrid Harbor, MO - 1984 196,373 385,509 Oct 70 
Obion River, TN 1' 3 - 1911 28,716 - - 
Osceola Harbor, AR - 1984 269,115 5,438,684 Nov 74 
Removing snags and wrecks from 
Mississippi River below mouth of Missouri 
River and from Old and Atchafalaya 
Rivers4�' 5 - 1948 - 318,833 4 
St. Francis and L'Anguille Rivers and 
Blackfish Bayou, AR 1 
2 - 1942 92,000 300,449 - 
White River, AR (below Newport) - 1984 169,994 18,562,372 - 
Wolf River (Memphis Harbor), TN - 1984 586,500 8,562,854 1959 
1. No commerce. 
2. Existing project is for maintenance only. 
3. Recommended for abandonment in H. Doc. 467, 69th 
Cong., 1st sess. 
4. Completion date not available. 
5. No funds available under this project. Work being 
carried on under "Appropriation, Flood Control, Mississippi 
River and tributaries. 
13-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 13-D OTHER AUTHORIZED 
FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 1987 
Full Report Operation 
Mo. and Yr. See Annual and Mo. and Yr. 
Project Deauthorized Report For: Construction Maintenance Completed 
Big Creek Canal, Millington, TN 
Big Creek and L'Anguille River, White 
River Basin, AR1 
Bradford, TN 
Clarendon to Laconia Circle, 
White River Basin, AR1 
Cottonwood Slough pumping plant, IL 2 
Drinkwater Sewer, MO 
Dyersburg, TN 2 
Dyersburg, TN (SW) 
Grays Creek Canal 
Shelby Co., TN 
Huntingdon, TN 
Long Lake Area 
Helena, AR 
Memphis, Wolf River, and 
Nonconnah Creek, TN 
Mounds and Mound City, 
Ohio River Basin, IL 4 
Nixon Creek, TN 2 
Nonconnah Blvd., 
Nonconnah Creek, TN 
N. Second St., Memphis, TN 
(Wolf River Bridge) 
Sandy Creek 
Jackson, TN 
St. Francis River 
Highway No.90 AR 
Treasure Island, MO 
US Hwy 51, Nonconnah Creek, TN 
W. Hickman, Area, Hickman, KY 
- 1977 $ 70,363 $ - 
6 May 81 
6 May 81 
Sep 1980 
Jul 1983 
1937 
1984 
1964 
1984 
1962 
1981 
1985 
1983 
1983 
1960 
1955 
1952 
1983 
1983 
1985 
1985 
1981 
1984 
1983 
95,061 
147,000 
1,494,828 
229,6493 
1,820,869 
155,280 
2,900,281 
61,281 
11,141,199 
1,132,704 
62,821 
249,999 
249,999 
238,000 
161,000 
861,528 
369,200 
1,674,180 
Dec 1983 
Feb 1964 
Jun 1980 
Jun 1962 
Oct 1976 
Aug 1985 
- May 1959 
Oct 19595 
Dec 1951 
Nov 1981 
Sep 1980 
Dec 1984 
Sep 1985 
Mar 1978 
Mar 1983 
Oct 1976 
1. Inactive, awaiting local cooperation. 
2. Authorized by Chief of Engineers under small project 
authority, Sec. 205, Flood Control Act of 1948, as amended. 
3. Includes $21,863 contributed funds. 
4. Work being completed under Mississippi River and 
Tributaries project. 
5. Exclusive of Cache River Pumping Station. 
13-6

MEMPHIS, TN, DISTRICT 
TABLE 13-E ACTIVE GENERAL INVESTIGATIONS 
(96x3121) 
Federal Cost Totals by 
Item and CWIS Number FY 87 Categories 
SURVEYS (Category 100) 
Miscellaneous Activities (170) 
Special Investigations (171) -17250 $ 33,620 
Coordination Studies with Other 
Agencies (180) 
Planning Assistance to States (186) - 14847 42,525 
TOTAL (Category 100) $ 76,145 
COLLECTIONS AND STUDY OF BASIC DATA (Category 200) 
Flood Plain Management Services (250) 
Flood Plain Management Services 234,684 
TOTAL (Category 200) $234,648 
GRAND TOTAL GENERAL INVESTIGATIONS $310,793 
13-7

ST. LOUIS, MO, DISTRICT * 
This district comprises those portions of southwestern 
Illinois and eastern Missouri embraced in 
drainage basin of Mississippi River and its western 
tributaries, exclusive of the Missouri River, from the 
mouth of the Ohio River to mile 300, and of its eastern 
tributaries to Hamburg Bay at mile 261 on left bank, 
exclusive of tributary basin of Illinois Waterway upstream 
of new La Grange Lock and Dam at mile 80.15 
above confluence of the Illinois and Mississippi Rivers. 
District also includes drainage basin in Missouri 
tributary to the Little River diversion channel. Report 
on the Mississippi River between the Missouri River 
and mile 300 is included in separate report on the 
Mississippi River between the Missouri River and 
Minneapolis, MN. Report on the portion of the Illinois 
River downstream of new La Grange Lock and Dam is 
included in report of the Chicago District on the Illinois 
Waterway, Illinois and Indiana. 
IMPROVEMENTS 
Navigation 
1. Illinois Waterway, IL 
(St. Louis Dist.) ................. 
2. Kaskaskia River, IL .............. 
3. Mississippi River between Missouri 
and Minneapolis, MN (St. Louis Dist.) 
S (Includes L&D 26 Replacement) ..... 
4. Mississippi River between Ohio 
and Missouri Rivers, MO, and IL .... 
5. Southeast Missouri Port, MO ........ 
Flood Control 
6. East St. Louis and vicinity, IL ...... 
7. Kaskaskia Island Drainage and 
Levee District, IL ................ 
8. Mauvaise Terre Drainage 
and Levee District, IL ............ 
9. Meramec River Basin, MO ......... 
9A. Meramec Park Lake, MO .......... 
9B. Pine Ford Lake, MO .............. 
10. McGee Creek Drainage and Levee 
District, IL ..................... 
11. Meredosia, IL, and Meredosia, 
Willow Creek, and Coon Run 
Drainage and Levee District, IL ..... 
12. Mississippi River Agricultural 
Area8, MO ..................... 
13. Nutwood Drainage and Levee 
District, IL .................... 
Page Flood Control (cont.) 
14. Perry County Drainage and Levee 
14-2 Districts Nos. 1, 2, and 3, MO ...... 
14-2 15. Rend Lake, Big Muddy River, IL .... 
16. Wood River Drainage and 
Levee District, IL ................ 
14-2 17. Inspection of completed flood 
control projects ................... 
14-2 18. Navigation work under 
14-3 special authorization .............. 
19. Flood control work under 
special authorization .............. 
14-3 
Multiple-Purpose Project 
14-3 Including Power 
20. Clarence Cannon Dam and Mark Twain 
14-4 Salt River, MO ................. 
14-4 
14-4 Tables 
14-4 Table 14-A 
Table 14-B 
14-5 Table 14-C 
Table 14-D 
Table 14-E 
Table 14-F 
14-5 
14-5 
14-5 
Cost and Financial Statement . 
Authorizing Legislation ...... 
Other Authorized 
Navigation Projects ......... 
Lakes, Levees, and 
Recreational Facilities ....... 
Other Authorized Flood 
Control Projects ........... 
Active General 
Investigations (96X3121) ..... 
Page 
14-6 
14-6 
14-6 
14-7 
14-7 
14-7 
14-7 
14-8 
14-10 
14-13 
14-13 
14-14 
14-16 
14-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. ILLINOIS WATERWAY, IL 
(ST. LOUIS DIST.) 
See report on Illinois Waterway, IL and IN, under 
Rock Island District. 
2. KASKASKIA RIVER, IL 
Location. The river rises in Champaign County, IL, 
about 5 miles northwest of Urbana, in east-central 
part of State. It flows southwesterly about 325 miles 
and empties into Mississippi River about 8 miles above 
RCihveesrt.e r, II, or about 118 miles above mouth of Ohio (See Cincinnati sheet of maps of United States 
published by Army Map Service, scale 1:500,000.) 
Previous project. For details see Annual Report for 
1896, page 171. 
Existing project. Improvement for navigation provides 
a channel 9 feet deep and 225 feet wide from 
mouth to Fayetteville, IL. Improvement consists of 
enlarging present channel where required, making 
overbank cutoffs to eliminate sharp bends, and construction 
of a dam at mile 0.8 with a single lock 84 
feet wide and 600 feet long, at an estimated total 
Federal project cost (1984) of $145,060,000. Non- 
Federal project cost is $7,665,000, of which $1,500,000 
is local contribution. 
Local cooperation. State of Illinois passed legislation 
authorizing Illinois Department of Public Works 
and Buildings to enter into assurances of local cooperation 
with the United States. These assurances have 
been furnished and were accepted on behalf of the 
United States on Sept. 10, 1965; these assurances were 
supplemented on Aug. 7, 1972, to incorporate the 
provisions of PL 91-646. 
Operations and results during fiscal year. Construction 
of remaining project items (Redressing and 
Revetment) was completed. 
A contract was awarded for replacement of the 
floating guidewall timber fenders. Hired labor performed 
operation and maintenance of the project. 
miles and empties into the Gulf of Mexico. Portion 
included in this report embraces the 195-mile section 
known as middle Mississippi, between tributary Ohio 
and Missouri Rivers about 974 to 1,169 miles from the 
gulf. See folder by Corps of Engineers of Navigation 
Charts, Middle and Upper Mississippi River, Cairo, 
IL, to Minneapolis, MN. 
Previous projects. For details see page 1879 of 
Annual Report for 1915, and page 1014 of Annual 
Report for 1938. 
Existing project. The existing project provides for 
obtaining and maintaining a minimum channel depth 
of not less than 9 feet, a minimum width of not less 
than 300 feet at low water, with additional widths in 
bends from mouth of Ohio River (about 974 miles from 
gulf) to northern boundary of city of St. Louis, mile 
191, thence 200 feet wide, with additional width in 
bends to mouth of Missouri River, mile 195; to be 
obtained: (1) by regulating works, for closing secondary 
channels, contracting river by building new 
banks where river width is excessive and protecting 
new and old banks from erosion where necessary to 
secure permanency at an estimated total Federal cost 
(1987) of $181,000,000; (2) by dredging to maintain 
project channels; (3) by construction of works authorized 
for Chain of Rocks reach in 1945 River and 
Harbor Act, which approved a comprehensive plan for 
development of the river at Chain of Rocks to provide 
for construction of a lateral canal at a cost of 
$59,720,600; and (4) by construction of a fixed-crest 
rock-fill dam about 900 feet below Chain of Rocks 
Bridge, authorized by 1958 River and Harbor Act, at 
cost of $4,353,000, excluding $7,000 costs to Coast 
Guard for aids to navigation. Estimated total Federal 
project cost (1986) is $245,073,600. A small boat harbor 
opposite Chester, IL, was deauthorized and excluded 
from foregoing cost estimate. See H. Doc. 669 (76th 
Cong., 3d sess.) for report of Chief of Engineers dated 
Feb. 27, 1940, containing a general plan for improvement 
of Mississippi River between Coon Rapids Dam 
and mouth of Ohio River for purposes of navigation, 
power development, flood control, and needs of 
irrigation. 
Local cooneration. None required. 
Terminal facilities. Existing facilities are con- 
3. MISSISSIPPI RIVER BETWEEN sidered adequate for existing commerce. 
MISSOURI RIVER AND MINNE- Operations and results during fiscal year. Reg- 
APOLIS MN (ST. LOUIS DIST.) ulating Works: Contract was continued on stone dike 
N (ST.and revetment construction as was engineering and (INCLUDES L&D 26 REPLACEMENT) design and supervision and administration. Construc- 
See separate section entitled "Mississippi River be- tion on existing project began in 1881 and project has 
tween Missouri River and Minneapolis, MN," printed been in beneficial use practically from its inception. 
in the Annual Report of the Chief of Engineers. . Projects on Dam 27 and Chain of Rocks are complete. 
Work on the project is about 76 percent complete. 
Channel as a whole has been greatly improved by the 
4. MISSISSIPPI RIVER BETWEEN work completed to date. Dredging is required at low 
OHIO AND MISSOURI RIVERS, stages to remove temporary shoals and maintain re- 
MO AND IL quired channel depths. River is generally above 10- 
foot stage, St. Louis gage, from latter part of February 
Location. Mississippi River rises in Lake Itasca, to the latter part of August, during which time project 
MN, and from that lake flows southerly about 2,340 channel depths generally prevail without dredging. 
14-2

ST. LOUIS, MO, DISTRICT 
Maintenance. Work consisted of 2,475 feet of dike 
and 20,443 feet of revetment repair. U.S. plant and 
hired labor performed channel dredging removing 
2,925,100 cubic yards of material from main channel. 
Condition and operation studies, recreation planning, 
engineering and design, and operation and maintenance 
of Lock and Dam 27 continued. 
5. SOUTHEAST MISSOURI PORT, 
MISSOURI 
Location. The project is located on the right bank 
of the Mississippi River at river mile 30 above the Ohio 
River in the counties of Scott and Cape Girardeau in 
Southeast Missouri. 
Existing project. Pursuant to Sec. 107, Public Law 
86-645, as amended, a slackwater channel, 2000 feet 
long, 230 feet wide and 9 feet deep is being constructed. 
This project will provide a navigation channel 
for development of a port and related facilities at 
this location. Total estimateed cost is $4,256,000 
(1,971,200 non-federal). 
Location cooperation. On May 22, 1987, a Local 
Cooperation Agreement was signed between the Port 
District and the St. Louis District, Corps of Engineers. 
Results during fiscal year: Construction work 
began on August 8, 1987. The contractor has completed 
an estimated 18 percent of the work by the end 
of the Fiscal Year 1987. 
Flood Control 
6. EAST ST. LOUIS AND VICINITY, IL 
Location. Project is in St. Clair and Madison Counties, 
IL, on the left bank of the Mississippi River 
between river miles 175 and 195 above the Ohio River. 
Project includes all bottomlands between bluffs on the 
east and Mississippi River and Chain of Rocks Canal 
on the west, and extends from Cahokia diversion channel 
on the north to Prairie du Pont Creek on the south. 
(See Corps of Engineers Navigation Charts, Middle 
and Upper Mississippi River, Cairo, IL, to Minneapolis, 
MN.) 
Existing project. The 1936 Flood Control Act authorized 
raising and enlarging existing levee systems by 
construction or reconstruction of 19.8 miles of levee, 
including 3.1 miles of floodwall, together with necessary 
appurtenant works consisting of gravity drainage 
structures, highway and railroad closure structures, 
alterations and reconstruction of existing pumping 
plants, alterations to railroad bridges and approaches 
at levee crossings, service roads on levee crown, and 
seepage control measures. Work under this authorizatio.
n provides the area protection against a flood of 
about 200-year frequency. The completed 10 miles of 
levee along Chain of Rocks Canal and Lock 27 provide 
flood protection on the landward side integral with 
and to the same degree as the East St. Louis levee. 
Final cost of work under this authorization is 
$22,550,100. The Flood Control Act of 1965 modified 
existing project to provide for channel improvements, 
diversion ditches, flood plain detention areas, a reservoir 
on Little Canteen Creek, and a pumping plant 
to considerably reduce damages resulting from interior 
flooding. This act also authorized reconstruction 
of a channel stabilization dam in Cahokia Creek diversion 
channel to provide protection to adjacent levees 
and bridges from scour and eventual loss. Post authorization 
studies have indicated that flood plain detention 
areas, the reservoir on Little Canteen Creek and 
other related flood control measures in the Cahokia- 
Harding Ditch Area are not economically feasible. 
Also, further studies of the channel stabilization dam 
in Cahokia Creek diversion channel have been 
deferred due to lack of support from the local sponsor 
of the project. Estimated total Federal project cost of 
work under this authorization is $33,600,000 (1985), 
$22,020,000 for Cahokia-Harding Ditch Area, and 
$11,580,000 for Blue Waters Ditch. Non-Federal cost 
is $20,770,000. 
Local cooperation. Local interests have fully complied 
with the requirements of local cooperation for 
work under the 1936 authorization. For work authorized 
by Flood Control Act of 1965 requirements of 
local cooperation are fully described on page 14-4 of 
Fiscal Year 1980 Annual Report. Formal assurances 
were accepted on the Blue Waters Ditch area on Jun. 
25, 1981. 
Operations and results during fiscal year. Construction 
of project modifications authorized by Flood 
Control Act of 1965 was continued. This work included 
ditching contracts and the Blue Waters Ditch pumping 
station. Work authorized by Flood Control Act of 
1936 is complete. The East St. Louis Pumping Station, 
which was constructed under the authority of the 
Flood Control Act of 1936, underwent major repairs 
to pumping units, gates and other equipment. 
7. KASKASKIA ISLAND DRAINAGE 
AND LEVEE DISTRICT, IL 
Location. In Randolph County, IL, on the right bank 
of the Mississippi River between miles 111 and 116 
above the mouth of the Ohio River. (See Paducah, KY, 
IL, MO, IN, map published by Army Map Service, 
scale 1:250,000.) 
Previous project. For details, see page 1375 of 
Annual Report for 1950. 
Existing project. Project area contains about 9,460 
acres only partially protected against flood stage of 
38.5 feet on the Chester, IL, gage. Flooding occurs 
about once in every 7.3 years with an average duration 
of 26 days, causing substantial damage. The 1962 
Flood Control Act (H. Doc. 519, 87th Cong., 2d sess.) 
provides for enlarging and raising the existing levee 
about 8 feet to provide protection against a flood 
having a frequency of once in 50 years. Estimated total 
14-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Federal project cost (1986) is $14,100,000. Non- 
Federal cost is $2,100,000. 
Local cooperation. Requirements of local cooperation 
are fully described on page 14-6 of Fiscal Year 
1980 Annual Report. Formal assurances from the 
Kaskaskia Island Drainage and Levee District were 
accepted on behalf of the United States on Jan. 23 1980. 
Operations and results during fiscal year. Preconstruction 
planning is complete. Construction is 
complete on the gravity drains. Plans and specifications 
for raising and enlarging the levee are complete 
and construction was continued on this item. 
8. MAUVAISE TERRE DRAINAGE 
AND LEVEE DISTRICT, IL 
Location. The levee district is in Scott County, IL 
on the left bank of the Illinois River between miles 
63.5 and 67.0 above the Mississippi River. (See Quincy, 
IL-MO, sheet of maps of the United States, published 
by Army Map Service, scale 1:250,000). 
Existing project. Project provides for raising a 
portion of the existing levee and construction of two 
railroad closure structures. Project will provide protection 
to 5,700 acres of land against a flood of 100- 
year frequency. Based on cost sharing requirements 
prior to enactment of PL 99-662, the estimated total 
Federal project cost (1987) is $1,840,000. Non-Federal 
cost is $185,000. Project was authorized by the Energy 
and Water Development Appropriation Act of 1985, 
Public Law 98-360, 98th Cong., 2nd Session. 
Local cooperation. The village of Naples, IL, signed 
a letter of intent, dated March 13, 1985, indicating a 
willingness to comply with the terms of local cooperation 
including provisions of the Uniform Relocations 
and Real Property Acquisition Policy Act of 1970 (PL 
91-646) and Section 221 of the Flood Control Act of 
1970 (PL 91-611). Local Cooperation requirements are: 
furnish without cost to the United States all lands, 
easements, and rights-of-way necessary and accomplish 
all relocations necessary for the construction of 
the project; hold and save the United States free from 
damages due to the construction works, save and 
except damages due to the fault or negligence of the 
United States or its contractor; and maintain and 
operate all the works after completion in accordance 
with regulations prescribed by the Secretary of the 
Army. It has been determined that cost sharing must 
be in accordance with the provisions of PL 99-662, 
which requires a substantial increase in cost of local 
cooperation. Details of local cost sharing have not been 
resolved. The Village of Naples is doubtful that they 
can assume responsibility for cost sharing as required 
by PL 99-662; however, they are still seeking resources 
necessary for the project to be undertaken and no 
decision has yet been reached to abandon the project. 
Operations and results during fiscal year. Planning 
was completed on all items. Further actions have 
been deferred pending a decision concerning local 
cooperation. 
9. MERAMEC RIVER BASIN, MO 
Location. The basin lies within the State of Missouri 
and comprises 3,980 square miles. The river is a west 
bank tributary of the Mississippi River at mile 161 
above mouth of Ohio River. Major streams in the basin 
include the Meramec, Big, and Bourbeuse Rivers. The 
basin extends about 100 miles southwesterly from St. 
Louis into the Ozark Highlands. (See St. Louis, MO, 
and Rolla sheets of maps of the United States, published 
by Army Map Service, scale 1:250,000.) 
Existing project. The project provides for the construction 
of Meramec Park and Union Lakes, authorized 
by the 1938 Flood Control Act; and Pine Ford, 
Irondale, and 1-38 Lake projects, and 19 angler-use 
sites, authorized by the 1966 Flood Control Act. Under 
the plan, Irondale and 1-38 Lakes will reduce flood 
damages in the upper Big and Bourbeuse Rivers. 
Meramec Park, Union, and Pine Ford Lakes will 
substantially reduce flooding in the lower basin area 
and will lower flood crests on the Mississippi River. 
Project will also provide water supply, water quality 
control, recreation, and fish and wildlife conservation. 
(See Table 14-D for additional data on this comprehensive 
project.) 
9A. MERAMEC PARK LAKE, MO 
Location. Proposed dam will be at mile 108.7 on 
Meramec River in Franklin County near Sullivan, 
MO. Reservoir will be mainly in Crawford, Franklin, 
and Washington counties, MO. (See St. Louis, MO, 
sheet of maps of the United States, published by Army 
Map Service, scale 1:250,000.) 
Operations and results during fiscal year. Project 
was deauthorized by Public Law 97-128. Land is being 
disposed of in accordance with deauthorizing act. 
9B. PINE FORD LAKE, MO 
Location. Proposed dam is on Big River at mile 43.8, 
about 45 miles southwest of St. Louis. The Big River 
is a tributary of the Meramec. Lake would extend 
about 34 miles up Big River. (See St. Louis, MO, sheet 
of maps of the United States, published by Army Map 
Service, scale 1:250,000.) 
Existing project. Project provides for construction 
of a compacted earth-fill dam with a concrete chute 
spillway. Dam will be 141 feet high and 2,070 feet long. 
Construction of new roads, improvements of existing 
roads, alterations to pipeline, power and telephone 
lines, and construction of recreational facilities are 
included. Maximum storage capacity will be 285,000 
acre-feet. Estimated total project cost (1984) is 
$147,000,000, of which $8,173,200 and $22,900,000 are 
local reimbursements for water supply and recreation 
and fish and wildlife respectively. 
Local cooperation. Local interests must contribute 
toward cost of project for storage allocation to water 
14-4

ST. LOUIS, MO, DISTRICT 
supply in accordance with the Water Supply Act of Operations and results during fiscal year. Project 
1958. has now been placed in the inactive category. 
Operations and results during fiscal year. Preconstruction 
planning previously funded but not 
completed. 
10. McGEE CREEK DRAINAGE 
AND LEVEE DISTRICT, IL 
Location. The levee district is in Brown and Pike 
Counties, IL, on the right bank of Illinois River 
between miles 67.2 and 75.1 above the Mississippi 
River. (See Kansas City sheet of maps of United States, 
published by Army Map Service, scale 1:500,000.) 
Existing project. Project provides for reconstruction 
of 14.7 miles of levee, construction of a new 
pumping plant, closure structure, and seepage control 
measures. Project will provide protection to about 
12,080 acres of agricultural land against a flood of 
about 50-year frequency. Estimated total Federal project 
cost (1983) is $25,500,000. Non-Federal cost is 
$930,000. Project was authorized by 1962 Flood Control 
Act (H. Doc. 472, 87th Cong., 2d sess.). 
Local cooperation. Requirements of local cooperation 
are fully described on page 14-9 of Fiscal Year 
1980 Annual Report. Local interests have executed 
assurances in compliance with Public Law 91-611 and 
Public Law 91-646. 
Operations and results during fiscal year. The 
project is essentially complete. 
11. MEREDOSIA, IL, AND MEREDOSIA, 
WILLOW CREEK, AND 
COON RUN DRAINAGE AND 
LEVEE DISTRICTS, IL 
Location. The levee district is in Morgan and Scott 
Counties, IL, on the left bank of the Illinois River 
between miles 67.0 and 72.2 above the Mississippi 
River. (See Quincy, IL-MO sheet of maps of the United 
States, published by Army Map Service, scale 
1:250,000.) 
Existing project. Project provides for construction 
of 11.0 miles of new or enlarged levee, a pumping 
plant, closure structure, and seepage control measures. 
Project will provide protection to 8,215 acres 
of land, 7,640 of which are highly productive agricultural 
lands, and 575 acres of noncrop and farmsteads 
against a flood of 50-year frequency. Estimated total 
Federal project cost (1986) is $12,100,000. Non- 
Federal cost is $1,030,000. Project was authorized by 
the 1962 Flood Control Act (H. Doc. 472, 87th Cong., 
2d sess.). 
Local cooperation. Requirements of local cooperation 
are fully described on page 14-9 of Fiscal Year 
1980 Annual Report. Local interests have indicated a 
willingness to meet the terms of local cooperation. 
12. MISSISSIPPI RIVER 
AGRICULTURAL AREA 8, MO 
Location. Area 8 is in Lincoln and Pike Counties, 
MO, on west bank of Mssissippi River between river 
miles 249 and 261 above the Ohio River. Small community 
of Elsberry lies within the area. (See Quincy 
sheet of maps of the United States, published by Army 
Map Service, scale 1:250,000.) 
Existing project. The 1966 Flood Control Act (H. 
Doc. 510, 89th Cong., 2d sess.) authorized the raising 
and enlarging of existing levees to provide 24.4 miles 
of riverfront, flank, and back levees and construction 
of appurtenant works consisting of drainage structure, 
highway and railroad closure structures, and alterations 
to existing pumping plants. The project has been 
reduced in scope to consist of replacing one existing 
drainage structure, replacing an obsolete stream 
driven pump unit with a new one of 150 cubic feet 
per second capacity, and rehabilitation of the pump 
station. Project will afford protection to the area 
against a flood of 50-year frequency. Estimated total 
Federal project cost (1980) is $2,400,000. Non-Federal 
cost is $20,000. 
Local cooperation. Fully complied with. See page 
14-10 of FY 1980 Annual Report. 
Operations and results during fiscal year. Project 
is complete. 
13. NUTWOOD DRAINAGE AND 
LEVEE DISTRICT, IL 
Location. The levee district is in Greene and Jersey 
Counties, IL, on the left bank of the Illinois River 
between miles 15.2 and 23.7 above the Mississippi 
River. (See Quincy, IL-MO, sheet of maps of the United 
States, published by Army Map Service, scale 
1:250,000.) 
Existing project. Project provides for raising and 
enlarging 11.4 miles of levee, construction of 1.0 mile 
of new levee, altering discharge line of pumping station, 
and construction of seepage control measures. 
Project will provide protection to 10,360 acres of land, 
9,635 of which are highly productive agricultural 
lands against a flood of 50-year frequency. Estimated 
total Federal project cost (1986) is $6,510,000. Non- 
Federal cost is $450,000. Project was authorized by 
the 1962 Flood Control Act (H. Doc. 472, 87th Cong., 
2d sess.). 
Local cooperation. Requirements of local cooperation 
are fully described on page 14-11 of Fiscal Year 
1980 Annual Report. Local interests have indicated a 
willingness to meet the terms of local cooperation. 
Operations and results during fiscal year. Preconstruction 
planning was continued under the gen- 
14-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
eral investigation appropriation. Construction has not 
begun. 
14. PERRY COUNTY DRAINAGE 
AND LEVEE DISTRICTS 
NOS. 1, 2, & 3, MO 
Location. Districts are in Perry County, MO, and 
Randolph County, IL, on the right bank of the Mississippi 
River between river miles 95 and 111 above the 
mouth of the Ohio River. (See Paducah, KY, IL, MO, 
IN, map published by Army Map Service, scale 
1:250,000.) 
Previous project. For details, see 475 of Annual 
Report for 1968. 
Existing project. Project area contains about 
26,881 acres protected from floods of the Mississippi 
River by levees. However, when Mississippi River 
stage exceeds 13 feet on the Chester, IL, gage, substantial 
damage results from impoundment of precipitation 
or seepage, or a combination thereof. 
Authorized project provides for construction of four 
pumping stations to reduce interior flooding. Estimated 
total Federal project cost (1982) is $8,812,000. 
Local cooperation. Requirements of local cooperation 
are fully described on page 14-11 of Fiscal Year 
1980 Annual Report. Assurances were furnished by 
local interests (presently, Boil Brule Levee District, 
MO). on Nov. 16, 1978, and were accepted Nov. 27, 
1978, by the District Engineer under delegated 
authority. 
Operations and results during fiscal year. Construction 
is essentially complete on all four pumping 
stations. 
15. REND LAKE, BIG MUDDY 
RIVER, IL 
Location. The lake is in Franklin and Jefferson 
Counties in southern Illinois. The dam is on Big Muddy 
River, 103.7 miles upstream from its confluence with 
the Mississippi River, and about 3 miles northwest of 
Benton, IL. (See Belleville sheet of maps of United 
States, published by Army Map Service, scale 
1:250,000, and Geological Survey quadrangle maps, 
1:62,500.) 
Existing project. The project provides for construction 
of an earth dam, ungated concrete spillway, 
relocation of roads and utilities, recreational facilities, 
access roads, and service facilities. In addition, two 
subimpoundment dams were constructed on upper 
arms of reservoir to enhance fish and wildlife value 
of project. Reservoir has an area of 24,800 acres, and 
a storage capacity of 294,000 acre-feet. Project provides 
flood control, water supply, low-flow regulations, 
conservation of fish and wildlife, recreation, and area 
development. Estimated total Federal project cost 
(1983) is $43,100,900, of which $12,197,700 is for lands 
and damages. Non-Federal local contribution for 
water supply is $9,941,300. Federal cost for code 711 
recreation facilities is $1,060,900. 
Local cooperation. Requirements of local cooperation 
are fully described on page 14-12 of Fiscal Year 
1980 Annual Report. Assurance of local cooperation 
and water supply contract have been executed and 
approved by the Secretary of the Army. 
Operations and results during fiscal year. Real 
estate activities in connection with project completion 
were performed. Lands acquired to date are 39,819 
acres in fee and 906 acres in easements. Project is 
essentially complete. 
Maintenance. Hired labor forces performed operation 
and maintenance of Rend Lake Reservoir. 
16. WOOD RIVER DRAINAGE AND 
LEVEE DISTRICT, IL 
Location. In Madison County, IL, on left bank of 
Mississippi River between river miles 195 and 203 
above Ohio River. District includes bottom lands between 
river and bluffs and extends from Cahokia 
diversion channel on the south to opposite lock and 
dam No. 26 at Alton, IL, on the north. Small industrial 
cities of Hartford, Wood River, Roxana, and East 
Alton and part of Alton riverfront, lie within the 
district. (See Corps of Engineers Navigation Charts, 
Middle and Upper Mississippi River, Cairo, IL, to 
Minneapolis, MN.) 
Existing project. The 1938 Flood Control Act 
authorized raising, enlarging, and extending existing 
levee system to provide 20.8 miles of levees and construction 
of appurtenant works consisting of gravity 
drainage structures, highway and railroad closure 
structures, alterations to existing or construction of 
new pumping plants; surfacing service road on levee 
crown, making necessary alterations to railroad tracks 
and bridges at levee crossings, seepage corrective 
measures and construction of a low-water dam at 
mouth of Wood River. Project will afford protection 
to this district against a flood of about 200-year frequency. 
Estimated total construction cost (1982) is 
$18,600,000 (excluding $23,000 contributed funds). 
Flood Control Act of 1965 modified 1938 Flood Control 
Act to provide for construction of a pumping station 
with collector ditches and necessary appurtenant facilities 
for removal of water impounded by existing levee. 
This portion of the project has been declared inactive. 
Local cooperation. Fully complied with for work 
authorized by 1938 Flood Control Act. 
Operation and results during fiscal year. Work 
authorized by the 1938 Flood Control Act is complete 
except for a closure structure. Construction was 
initiated on this item. 
14-6

ST. LOUIS, MO, DISTRICT 
17. INSPECTION OF COMPLETED 
FLOOD PROJECTS CONTROL 
Inspection of completed work was accomplished at 
a cost of $451,820 for the fiscal year. Total cost as of 
end of fiscal year is $5,911,239. 
18. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Sec. 107, Public 
Law 86-645, as amended (preauthorization). 
No activity during this Fiscal Year. 
19. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to Sec. 205, 
Public Law 858, 80th Cong., as amended (preauthorization). 
Preauthorization study costs for fiscal year were 
$17,391 for Columbia Levee and Drainage District, 
Monroe County, IL; $36,339 for Crooked Creek, Bollinger 
County, MO; $2,164 for E. Cape Girardeau Main 
Ditch, IL; $78,563 for St. Peters, MO; and $54,463 for 
Modoc Levee and Drainage District, IL; $5,500 for Big 
Muddy River, West Frankfort; $7,500 for Boise Brule 
Levee and Drainage District, MO; $6,628 for Lower 
Salt River Pike County, MO; and $9,540 for Mississippi 
Levee System, Monroe. 
The Water Resources Development Act of 1986 authorized 
construction of a levee approximately one-fifth 
of a mile long to be built in Meredosia, IL, at a total 
cost of $80,000. 
Emergency Bank Protection. 
Costs for fiscal year were $150,741 for Illinois River, 
Hardin, IL. 
Emergency flood control activities-repair, flood 
fighting, and rescue work (Public Law 99, 84th 
Cong., and antecedent legislation). 
Federal costs for the fiscal year were $117,903 for 
disaster preparedness, $451,820 for inspection of completed 
works and $1,054,694 for rehabilitation. 
Multiple-Purpose Project 
Including Power 
20. CLARENCE CANNON DAM AND 
RESERVOIR SALT RIVER, MO 
Location. Salt River rises in Schuyler County, about 
12 miles south of Missouri-Iowa State line. It flows 
southeasterly about 192 miles and empties into Mississippi 
River about 2 miles above Louisiana, MO, or 
about 284 miles above mouth of Ohio River. (See 
Kansas City and Quincy sheets of maps of United 
States published by Army Map Service, scale 
1:500,000, and Geological Survey quadrangle maps, 
1:250,000.) 
Previous project. For details, see page 645 of 
Annual Report for 1968. 
Existing project. Project provides for construction 
of a multiple-purpose reservoir, including power, flood 
control, water supply, navigation storage, pollution 
abatement, fish and wildlife conservation, and recreation. 
Dam consists of a compacted earth embankment 
with a concrete spillway controlled by tainter gates. 
Dam and spillway are about 1,700 feet long. Spillway 
structure consists of an ogee overflow section surmounted 
by four 50- by 30-foot tainter gates. Reservoir 
will have a storage capacity of 1,428,000 acre-feet for 
use of flood control, future domestic and industrial 
water supply, sediment storage, and power generation. 
Project plan provides for installation of one 27,000 KW 
conventional unit and one 31,000 KW reversible unit 
for pumped storage operations. Total Federal project 
cost estimate (1984) is $330,000,000 of which $22,420,000 
is for lands and damages; $14,300,000 for water 
supply; $76,000,000 for hydropower. 
Local cooperation. Requirements of local cooperation 
are fully described on page 14-13 of Fiscal Year 
1980 Annual Report. Assurances have been received 
from the State of Missouri and approved by the Chief 
of Engineers. 
Operations and results during fiscal year. Work 
is complete on all major items. Work remaining consists 
of minor items on recreation facilities. Lands 
acquired to date are 55,277 acres in fee and 10,068 
acres in easements. Project is essentially complete. 
14-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 14-A COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project 
2. Kaskaskia River 
IL (Regular 
Funds) 
(Contrib. Funds) 
4. Mississippi River 
Between Ohio and 
Missouri Rivers 
(Includes Chain 
of Rocks) 
5. Southeast Missouri 
Port, MO 
6. East St. Louis and 
Vicinity, IL 
(Contrib. Funds) 
7. Kaskaskia Island 
Drainage & Levee 
District, IL 
8 Mauvaise Terre 
Drainage & Levee 
District, IL 
9A. Meramec Park 
Lake, MO 
9B. Pine Ford 
Lake, MO 
10. McGee Creek 
Drainage & 
Levee District, 
IL 
11. Meredosia, IL, 
and Meredosia, 
Willow Creek and 
Coon Run Drainage 
& Levee Districts, 
IL 
12. Mississippi River 
Agricultural Area 
No. 8, IL 
13. Nutwood Drainage 
& Levee 
District, IL 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Total Funds to 
FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
$5,209,000 
3,885,032 
587,000 
911,518 
104,348
0 
2,610,000 
3,440,369 
7,490,000 
7,157,647
0
0 
2,597,000 
2,167,981
0 
158,733 
1,057,000 
451,595
00 
0 
16,897 
326,000 
412,597 
S.0 
366 
5,420,000 
5,366,819
00 
0 
5,634
0 
120 
$5,300,000 
6,419,905 
1,370,000 
1,345,081
0
0 
4,197,000 
4,571,548 
12,264,000 
12,217,020
00 
3,450,000 
2,858,126 
512,750 
16,250 
2,750,000 
2,807,469
0 
149,447
0 
36,346 
379,000 
362,268
0 
721 
1,780,000 
2,674,729 
$14,300,000 
14,204,126 
1,372,000 
1,177,658 
18,626
0 
3,541,000 
3,415,685 
9,545,000 
9,771,652
00 
1,890,000 
2,446,626 
119,000 
516,340 
957,000 
1,626,323
0 
337,089
0 
26,870 
426,000 
454,511 
-36,000 
341
0 
136,924 
00 
0 
4,063
0
0 
0
0
0 
169
00 
$ 15,000 
192,628
00 
00 
4,594,000 
4,667,633 
12,262,000 
12,566,762 
660,000 
480,601 
-112,000 
134,522
0 
99,176 
3,951,000 
4,073,697 
-15,000 
49,575
0 
24,467 
529,000 
505,528
00 
130,000 
75,145
00 
00 
00 
$147,415,0001 
147,181,7901 
11,731,256 
11,485,246 
1,158,356 
1,118,160 
179,098,6002 
178,934,7782 
227,218,1333 
227,027,7043 
660,000 
480,601 
16,847,3264 
16,540,9165 
961,750 
961,750 
12,658,000 
12,521,365 
585,000 
536,111 
30,568,0006 
30,567,2446 
4,044,600 
4,007,059 
3,644,001 
3,644,001 
25,050,300 
24,882,177 
370,000 
370,000 
2,137,000 
2,137,000 
670,000 
670,000 
14-8

ST. LOUIS, MO, DISTRICT 
TABLE 14-A 
(Continued) 
COST AND FINANCIAL STATEMENT 
See 
Section Total Funds to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
14. Perry County New Work 
Drainage & Levee Approp. 270,300 16,000 0 0 7,968,7007 
District Nos. 1, Cost 266,200 47,146 859 0 7,968,7007 
2, &3, MO 
15. Rend Lake, Big New Work 
Muddy, IL Approp. 0 - 0 0 43,700,900 
(Regular Funds) Cost 35,976 24,820 17,224 19,926 43,691,712 
Maint. 
Approp. 1,958,000 3,302,500 2,759,600 2,558,822 28,575,6228 
Cost 2,072,978 3,103,736 2,812,138 2,620,317 28,378,3438 
Code 711 Funds New Work 
Approp. 0 0 0 0 1,060,900 
Cost 0 0 0 0 1,060,900 
(Contrib. Funds) New Work 
Contrib. 0 0 0 0 9,941,2789 
Cost 0 0 0 0 9,941,2789 
Maint. 
Contrib. 304,348 300,000 300,000 532,627 4,018,930 
Cost 293,485 305,279 247,328 582,664 4,010,711 
16. Wood River New Work 
Drainage & Levee Approp. 1,000,000 0 118,000 500,000 17,207,82110 
District, IL Cost 424,513 362,773 416,517 463,192 17,130,45410 
20. Clarence Cannon New Work 10,240,300 3,622,000 820,000 673,000 312,692,02811 
Dam and Reservoir, Approp. 8,922,842 2,948,571 1,795,702 1,625,900 311,289,80411 
Salt River, MO Cost 
Maint. 
Approp. 2,074,000 3,260,500 3,929,600 4,077,322 20,157,982 
Cost 2,127,691 3,190,444 3,633,059 4,340,515 19,928,608 
1. Excludes $10,461 expended on previous project. 
2. Excludes previous project cost of $1,416,620. 
3. In addition $3,109 was expended for rehabilitation. 
4. Includes $8,072,326 for work authorized by Flood 
Control Act of 1965. 
5. Includes $7,921,939 for work authorized by Flood 
Control Act of 1965. 
6. Includes $200,000 for definite project under 1938 
Flood Control Act. 
7. Excludes $6,800,700 for previous project. 
8. Excludes $550,000 Area Development Administra 
tion Funds allotted to the State of Illinois for increased 
construction costs of Interstate Highway 57 to meet project 
requirements, and excludes $449,093 Area Redevelopment 
Administration Funds allotted to the Corps. 
9. Includes $6,103,711 credit to State of Illinois for 
work in kind. 
10. Funds are for work authorized by Flood Control Act 
of 1938. 
11. Includes $216,628 for definite project study under 
1938 Flood Control Act.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 14-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Oct. 23, 1962 
Jun. 3, 1896 
Jun. 13, 1902 
Mar. 2, 19071 
Mar. 3, 19051 
Jun. 25, 1910 
Jan. 21, 1927 
Jul. 3, 1930 
Mar. 2, 1945 
Sep. 3, 19543 
Jul. 3, 19584 
Oct. 21, 1978 
Dec. 29, 1981 
Aug. 15, 1985 
and Nov. 17, 
1986 
1960 River and 
Harbor Act as 
amended, 
Section 107 
Nov. 17, 1986 
Jun. 22, 1936 
Oct. 27, 1965 
Oct. 22, 1976 
Oct. 23, 1962 
Oct. 23, 1962 
KASKASKIA RIVER, IL (See Section 2 of Text) 
Construct canal, lock, and dam to provide a 9-foot navigation 
channel from mouth to Fayetteville, IL. 
MISSISSIPPI RIVER BETWEEN OHIO AND MISSOURI 
RIVERS (See Section 4 of Text) 
Project for regulating works in 1881. (To obtain a minimum 
depth of 8 feet.) 
Dredging introduced as part of the project. 
These acts practically abrogated that part of project for middle 
Mississippi which proposed regulating works. 
Regulating works restored to project and appropriations begun 
with a view to completion of improvement between Ohio and 
Missouri Rivers within 12 years at an estimated cost of $21 
million, exclusive of amounts previously expended. 
For 9 feet deep and 300 feet wide from Ohio River to northern 
Rivers and Harbors boundary of city of St. Louis. 
Project between northern boundary of St. Louis and Grafton 
(mouth of Illinois River) modified to provide a channel 9 feet 
deep and generally 200 feet wide with additional width around 
bends. 
Modified to provide construction of a lateral canal with lock at 
Chain of Rocks. 
Modified to provide construction of a small-boat harbor opposite 
Chester, IL. 
Modified to provide construction of a fixed crest rockfill dam 
900 feet below Chain of Rocks Bridge. 
LOCK AND DAM NO.26 (REPLACEMENT) 
Construct new Dam and a 1,200 Foot Lock approximately two 
miles downstream of the existing structure. 
Change name from "Lock and Dam No. 26" to "Melvin Price 
Lock and Dam" upon termination of service in U.S. Congress. 
Construct a second lock, 600 feet long the Lock and Dam No. 26. 
(Replacement) Project. 
SOUTHEAST MISSOURI PORT, MO (See Section 5 of Text) 
Construct harbor channel with adjacent landfill. 
CAPE GIRARDEAU, JACKSON METROPOLITAN 
AREA, MO 
As outlined in the Report of the Chief of Engineers dated Dec. 8, 
1984, the Water Resources Development Act of 1986 authorizes 
flood control and related recreational improvements in the 
Cape La Croix Creek Watershed. 
EAST ST. LOUIS AND VICINITY, IL (See Section 6 of Text) 
Raise and enlarge existing levee. 
Construct pumping plant and other modifications to reduce 
interior flooding. 
Construct Blue Waters Ditch as independent section. 
ELDRED AND SPANKEY DRAINAGE AND LEVEE 
DISTRICT, IL 
Raise and enlarge existing levee and other modifications. 
HARTWELL DRAINAGE AND LEVEE DISTRICT, IL 
Raise and enlarge existing levee and other modifications. 
S. Doc. 44, 87th Cong., 1st 
sess. 
Annual Report, 1881, p. 
1536. 
Committee Doc. 9, 69th 
Cong., 2d sess. 
Rivers and Harbors Committee 
Doc. 12, 70th Cong., 
1st sess. 
H. Doc. 231, 76th Cong., 1st 
sess. 
H. Doc. 230, 83d Cong., 1st 
sess. 
Public Law 95-502, 95th 
Cong. 
Public Law 97-118, 97th 
Congress. 
Public Law 99-88 and Public 
Law 99-662, 99th Cong. 
Public Law 99-662, 99th 
Cong., 2d Sess. 
Special report on record in 
OCE. 
H. Doc. 329, 88th Cong., 2d 
sess. 
Public Law 94-587, 94th 
Cong. 
H. Doc. 472, 87th Cong., 2d 
sess. 
H. Doc. 472, 87th Cong., 2d 
sess. 
14-10

TABLE 14-B 
(Continued) 
Acts 
Oct. 23, 1962 
Oct. 23, 1962 
Nov. 17, 1986 
Jul. 14, 1984 
Jun. 28, 1938 
Nov. 7, 1966 
Oct. 23, 1962 
Oct. 23, 1962 
Oct. 23, 1962 
Nov. 7, 1966 
Oct. 23, 1962 
Adopted by 
Senate and 
House Committee 
resolutions, 
Oct. 12, 19725 
Oct. 23, 1962 
ST. LOUIS, MO, DISTRICT 
AUTHORIZING LEGISLATION 
- --- ~ Work Authorized 
HILLVIEW DRAINAGE AND LEVEE DISTRICT, IL 
Raise and enlarge existing levee and other modifications. 
KASKASKIA ISLAND DRAINAGE AND LEVEE DISTRICT, 
IL (See Section 7 of Text) 
Raise and enlarge existing levee. 
MALINE CREEK, MISSOURI 
As outlined in the Report of the Chief of Engineers dated Nov. 
2, 1982, the Water Resources Development Act of 1986 authorizes 
flood control, recreation and environmental 
improvements. 
MAUVAISE TERRE DRAINAGE AND LEVEE 
DISTRICT, IL (See Section 8 of Text) 
Raise and enlarge existing levee and other modifications. 
MERAMEC RIVER BASIN, MO (See Section 9 of Text) 
Construct reservoirs and local protection project. 
Construct Pine Ford, Irondale, and 1-38 dams and 19 Angleruse 
sites. 
MCGEE CREEK DRAINAGE AND LEVEE DISTRICT, 
IL (See Section 10 of Text) 
Reconstruct existing levee and construct pumping plant to 
reduce flooding. 
MEREDOSIA, IL, AND MEREDOSIA, WILLOW CREEK 
AND COON RUN DRAINAGE AND LEVEE DISTRICTS, 
IL (See Section 11 of Text) 
Raise and enlarge existing levee and other modifications. 
MEREDOSIA LAKE AND WILLOW CREEK DRAINAGE 
AND LEVEE DISTRICT, IL 
Raise and enlarge existing levee and other modifications. 
MISSISSIPPI RIVER AGRICULTURAL AREA 8, MO (See 
Section 12 of Text) 
Raise and enlarge existing levee and alter pumping plant to 
reduce flooding. 
NUTWOOD DRAINAGE AND LEVEE DISTRICT, IL (See 
Section 13 of Text) 
Raise and enlarge existing levee and other modifications. 
PERRY COUNTY DRAINAGE AND LEVEE DISTRICTS 
NOS. 1, 2, & 3, MO (See Section 14 of Text) 
Construct pumping plants and other modifications to reduce 
interior flooding. 
REND LAKE, BIG MUDDY RIVER, IL (See Section 15 of 
Text) 
Construct dam at Benton, Ill., and subimpoundment dams on 
upper arms of reservoir. 
14-11 
Documents 
H. Doc. 472, 87th Cong., 2d 
sess. 
H. Doc. 519, 87th Cong., 2d 
sess. 
Public Law 99-662, 99th 
Cong., 2d Sess. 
Energy and Water Development 
Approp. 
Act of 1985, 98th Cong., 
2nd sess. 
Flood Control Committee 
Doc. 1, 75th Cong., 1st 
sess. 
H. Doc. 525, 89th Cong., 2d 
sess. 
H. Doc. 472, 87th Cong., 2d 
sess. 
H. Doc. 472, 87th Cong., 2d 
sess. 
H. Doc. 472, 87th Cong., 2d 
sess. 
H. Doc. 472, 87th Cong., 2d 
sess. 
H. Doc. 360, 92nd Cong., 2d 
sess. 
H. Doc. 541, 87th Cong., 2d 
sess.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL, WORKS ACTIVITIES FOR FY 1987 
TABLE 14-B 
(Continued) 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
STE. GENEVIEVE, MO 
Nov. 17, 1986 As outlined in the Report of the Board of Engineers for Rivers Public Law 99-662, 99th 
and Harbors dated Apr. 16, 1985, the Water Resources Devel- Cong., 2d Sess. 
opment Act of 1986 authorizes construction of a levee and a 
pumping plant to protect the city from Mississippi River and 
Gabouri Creek floods. 
WOOD RIVER DRAINAGE AND LEVEE DISTRICT, IL 
(See Section 16 of Text) 
Jun. 28, 1938 Construct reservoirs and local protection projects. Flood Control Committee 
Doc. 1, 75th Cong., 1st 
sess. 
CLARENCE CANNON DAM AND RESERVOIR, SALT 
RIVER, MO (See Section 20 of Text) 
Oct. 23, 1962 Modified act of 28 Jun. 1938 by deleting the reservoir therefrom H. Doc. 507, 87th Cong., 2d 
and reauthorizing it as a separate multiple-purpose project. sess. 
Oct. 27, 1965 Changes name of project from Joanna Dam to present Public Law 89-298, 89th 
designation. Cong. 
1. Also joint resolution, Jun. 29, 1906. 
2. Contains latest published map. 
3. Inactive. 
4. All work completed. 
5. Authorized under provision of Sec. 201 of the Flood 
Control Act of 1965. 
14-12

ST. LOUIS, MO, DISTRICT 
TABLE 14-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sep. 1987 
Full Report Operation 
Mo. and Yr. See Annual and Mo. and Yr. 
Project Deauthorized Report For: Construction Maintenance Completed 
Cuivre River, MO - 1883 $ 12,000 $ - 
Grafton Small Boat Harbor, IL Nov. 1977 19622 - - 
Mississippi River at Alton, IL 
Small Boat Harbor Nov. 1977 19582 - - - 
Moccasin Springs, MO - 1969 76,4363 - - 
Small Boat Harbor opposite Chester, IL Nov. 1977 19542 - - - 
Small Boat Harbor opposite Hamburg, IL Nov. 1977 19502 - - - 
Wabash Railroad Bridges, Illinois River, 
Meredosia, and Valley City, IL - 1961 2,653,194 1961 
1. Inactive. River declared nonnavigable by act of Mar. 2. Year authorized. 
23, 1900. 3. Excludes $56,605 contributed funds. 
TABLE 14-D LAKES, LEVEES, AND 
RECREATIONAL FACILITIES 
Estimated 
See Required Total Estimated 
Section Estimated Non-Federal Cost (Date to 
in Text Project Name Federal Cost Cost Revision) 
11. Meramec River Basin, MO Lakes: 
Union2 101,305,000 11,695,000 113,000,000 (1982) 
Pine Ford' 115,926,800 31,073,200 147,000,000 (1984) 
Irondale3 8,744,370 66,700,000 1982 
I-382 27,294,000 2,306,000 29,600,000 1982 
1. Separate reports are included herein. 
2. See 1979 Annual Report for details. 
14-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 14-E OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
Cost to Sep. 1987 
For Last 
Full Report Operation 
Mo. and Yr. See Annual and Mo. and Yr. 
Project Deauthorized Report For: Construction Maintenance Completed 
Angler-use sites, Meramec Basin, MO 
Big Swan Drainage and Levee District, 
Illinois River, IL' 
Cache River Diversion, IL 
Cape Girardeau, MO, 
reaches Nos. 1, 3, and 4 
Cape Girardeau, MO, No. 2 
Carlyle Lake, IL 
Chouteau, Nameoki, and Venice Drainage 
and Levee District, IL 
Clear Creek Drainage and 
Levee District, IL2 
Columbia Drainage and Levee 
District No. 3, IL 
Degognia and Fountain Bluff Levee and 
Drainage District, IL 
Dively Drainage & Levee District, IL 
East Cape Girardeau and Clear Creek 
Drainage District, IL 
Eldred, IL 
Emergency bank protection for certain 
highway and railroad facilities at Price 
Landing, MO (see Flood Control 
Act of 1944) 4 
Emergency repairs to levees on Mississippi, 
Illinois, and Kaskaskia Rivers and flood 
fighting and rescue work (Sec. 5, Flood 
Control Act of 1941, as amended)4 
Emergency protection for certain highway 
and railroad facilities at Chester, IL, bridge 
(Sec. 12, Flood Control Act of 1944) 
Emergency protection for Illinois approach, 
Chain of Rocks Bridge (Sec. 12, Flood 
Control Act of 1944) 
Fort Chartres and Ivy Landing Drainage 
District No. 5, IL 
Fort Chartres and Ivy Landing Drainage 
District No. 5 and Stringtown Drainage 
and Levee District No. 4, IL 
Grand Tower Drainage and 
Levee District, IL 
Harrisonville Levee and 
Drainage District IL 
Indian Creek Area, Illinois River, IL' 
Kaskaskia Island Drainage and 
Levee District, IL 
Keach Drainage and Levee District, IL' 
Lake Shelbyville, IL 
Levee Districts between Carlyle and 
New Athens, IL, Nos. 2, 5, 6, and 7 
Levee Districts between Carlyle and 
New Athens, IL, Nos. 3, 4, 8, 10, and 13 
Levee Districts between Cowden 
and Vandalia, IL 
Meredosia Lake and Willow Creek Drainage 
and Levee District, IL 
Miller Pond Drainage District, IL 
Oct. 1986 
Oct. 1986 
Oct. 1978 
Nov. 1979 
Oct. 1986 
Nov. 1981 
Oct. 1986 
Nov. 1979 
Nov. 1979 
Oct. 1978 
1967 $ 
1953 
1959 
1965 
1981 
1955 
1964 
1981 
1959 
1976 
1963 
19623 
1950 
1953 
1952 
1946 
1970 
1971 
1959 
1981 
1959 
1981 
1979 
1979 
1978 
1944 
1955 
2,837,114 
22,000 
5,157,805 
46,013,699 
185,700 
4,984,500 
2,818,000 
5,889,500 
1,720,000 
1,920,600 
1953 
39,692,401 
1964 
Oct. 1976 
1955 
1963 
55,415 
1,033,279 
50,000 
25,000 
1,154,800 
4,677,900 
5,829,000 
297,460 
47,927,562 
Aug. 1981 
1959 
1976 
1963 
Oct. 1949 
1951 
Jan. 1952 
Aug. 1945 
1958 
1959 
Mar. 1981 
- 1949 
36,936,298 Sep. 1978 
496,000 
249,738 
164,183 
1944 
1955 
14-14

ST. LOUIS, MO, DISTRICT 
TABLE 14-E 
(Continued) 
OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
Cost to Sep. 1987 
For Last 
Full Report Operation 
Mo. and Yr. See Annual and Mo. and Yr. 
Project Deauthorized Report For: Construction Maintenance Completed 
Mississippi River at St. Louis, MO - 1980 79,265,166 - Jan. 1980 
Mississippi River Agricultural Area 
No. 10, MO Nov. 1979 1967- 
Mississippi River Agricultural Area 
No. 12, MO - 1967- 
Mississippi River, Alton to Gale, IL, 
underseepage measures - - 85,422 - Oct. 1962 
North Alexander Drainage and 
Levee District, IL - 1957 939,569 - 1957 
Prairie du Pont Levee and 
Sanitary District, IL5 - 1970 6,005,127 - 1970 
Prairie du Rocher and vicinity, IL - 1959 3,882,600 - 1959 
Preston Drainage and Levee District, IL - 1959 1,866,910 - 1959 
Richland Creek, IL - 1969 401,000 -- 
Riverland Levee District, MO Aug. 1977 19363 -- 
Scott County Drainage and Levee District, 
Illinois River, IL Oct. 1986 - - 
Ste. Genevieve County Drainage and 
Levee District No. 1, MO Nov. 1977 19363 - 
St. Louis County Drainage and 
Levee District No. 1, MO Nov. 1977 19363 - - - 
Strington, Ft. Chartres and Ivy Landing, IL - 1957 2,123,700 - Aug. 1956 
Union Lake, MO6 - 1979 4,918,203 -- 
Urban areas at Alton, IL - 1960 192,000 -- 
Village of New Athens, IL - 1981 1,983,000 - Sep. 1981 
Valley City Drainage & Levee District, IL7 - 1967 91,952 - 1967 
Wiedmer Chemical Drainage and Levee 
District, MO Nov. 1977 19363 - 
1. Projects authorized or modified by Flood Control Act 
of Oct. 23, 1962 (see H. Doc. 472, 87th Cong., 2d sess., for 
details). 
2. Completed except for seepage control measures, which 
are inactive. 
3. Year authorized. 
4. Work complete, now performed under Public Law 99. 
5. Includes $5,235,927 for previous project. 
6. Includes $183,638 for definite project study under 
1938 Flood Control Act. Includes Highway 185 funds. 
7. Authorized by Chief of Engineers (Sec. 205, 1948 
Flood Control Act, as amended). 
14-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 14-F ACTIVE GENERAL INVESTIGATIONS 
(96x3121) 
Federal Cost Totals by 
Item and CWIS Number FY 87 Categories 
SURVEYS (Category 100) 
Flood Damage Prevention Studies (120) 
Alexander and Pulaski Counties, IL -12217 
St. Louis Metropolitan Area, MO & IL -55040 
Creve Coueur Crk, MO -12440 
Meramac R. Basin Missouri Study, Mo. -14056 
Sub-total 
Review of Authorized Projects (160) 
Vandlia D&LD No. 2 -77000 
Miscellaneous Activities (170) 
Special Investigations -17250 
Review of FERC Licenses -53857 
Sub-total 
Coordination Studies with Other Agencies (180) 
Dept. of Agric. - Soil Cons. Service -51840 
Plan Assist to State of Ill. -14817 
Plan Assist to State of Mo. -14829 
Sub-total
TOTAL (Category 100) 
COLLECTION AND STUDY OF BASIC DATA (Category 200) 
Flood Plain Management Services (250) -82030, and 82040 
Hydrology Studies (260) -53820 
TOTAL (Category 200) 
RESEARCH AND DEVELOPMENT (Category 300) 
Energy Management (372) -31372 
TOTAL (Category 300) 
CONTINUATION OF PLANNING & ENGINEERING (Category 400) 
St. Louis Harbor, Mo. & II. -10184 
Maline Creek, Mo. -12297 
TOTAL (Category 400) 
ADVANCE ENGINEERING AND DESIGN (Category 600) 
Cape Girardeau - Jackson -12356 
Maline Creek, MO -12297 
Meredosia IL, and Meredosia, 
Willow Creek & Coon Run D&LD, IL -00069 
Meremac River Basin, MO -75412 
Nutwood D&LD, IL -00623 
TOTAL (Category 600) 
GRAND TOTAL GENERAL INVESTIGATIONS 
$ 39,905 
638,933 
179,212 
64,141 
922,191 
500 
28,433 
3,059 
31,492 
2,763 
3,630 
12,542 
18,935 
156,568 
14,131 
17,825 
53,952 
29,545 
294,121 
368,089 
45,225 
12,003 
1,627 
$ 973,118 
$ 170,699 
$ 17,825 
$ 83,497 
$ 721,065 
$1,966,204 
14-16

GALVESTON, TX DISTRICT * 
Galveston District comprises drainage basins of all short 
streams arising in coastal plain of Texas and flowing into 
the Gulf of Mexico, including the entire basin of Buffalo 
Bayou, San Jacinto, San Bernard, Lavaca, Navidad, 
Mission, and Aransas Rivers. It embraces Agua Dulce, San 
Fernando, and Olmos Creek Basins draining into Baffin Bay, 
and coastal area south thereof to the Rio Grande and east 
of western Boundary of Starr County, Texas. It includes 
lower basins of major streams flowing into the Gulf of 
Mexico: Sabine River, Texas and Louisiana, downstream 
from U.S. Highway 190 crossing at Bon Wier, Texas; Neches 
River downstream from Town Bluff gaging station; Trinity 
River downstream from Texas State Highway 19 crossing 
at Riverside, Texas; Brazos River downstream from 
confluence with Navasota River; Colorado River 
downstream from northern boundary of Fayette County; 
Guadalupe River downstream from confluence with San 
Marcos River; San Antonio River downstream from 
confluence with Escondido Creek; Nueces River 
downstream from confluence with Frio and Atascosa River. 
IMPROVEMENTS 
Page Flood Control (cont.) 
Aquatic Plant Control (Southwestern 
Division) .............. .............. 
Brazos Island Harbor, TX .................. 
Channel to Port Bolivar, TX ............... 
Corpus Christi Ship Channel, TX ........... 
Double Bayou, TX .................... 
Freeport Harbor, TX ...................... 
Galveston Harbor and Channel, TX .......... 
Gulf Intracoastal Waterway between Apalachee 
Bay, FL, and the Mexican Border ........... 
Houston Ship Channel, TX ................. 
Matagorda Ship Channel, TX .............. 
Sabine-Neches Waterway, TX ............... 
Texas City Channel, TX .................... 
Trinity River and Tributaries, TX ............ 
Anahuac Channel, TX ..................... 
Channel to Liberty, TX .................... 
Wallisville Lake, TX ...................... 
Reconnaissance and Condition Surveys ...... 
Navigation Work Under Special Authorization . 
Beach Erosion Control 
Corpus Christi Beach, TX ................. 11 
Beach Erosion Work Under Special 
Authorization............................11 
Flood Control 
18. Buffalo Bayou and Tributaries, TX ........... 13 
19. Clear Creek, TX ......................... 13 
20. Lower Rio Grande Basin, TX .............. 14 
21. Port Arthur and Vicinity, TX Hurricane-Flood 
Protection .................. ............. 14 
22. Sims Bayou, TX ............. ............ 14 
23. Taylors Bayou, TX ....................... 15 
24. Texas City and Vicinity, TX Hurricane-Flood 
Protection .............. ............ 15 
25. Upper White Oak Bayou, TX .............. 15 
26. Vince and Little Vince Bayous, TX .......... 15 
27. Inspection of Completed Flood Control 
W orks..................................16 
28. Flood Control Work Under Special 
Authorization............................16 
29. Emergency Stream Bank and Shoreline Erosion 
Work Under Special Authorization ........... 16 
General Investigations 
30. 
31. 
32. 
Surveys ............................. 17 
Planning and Engineering ................. 17 
Collection and Study of Basic Data .......... 17 
Tables 
15-A Cost and Financial Statement .............. 19 
15-B Authorizing Legislation ................... 25 
15-C Other Authorized Navigation Projects ......... 37 
15-D Other Authorized Flood Control Projects ...... 37 
15-E Total Cost of Existing Projects .............. 39 
15-F Channel Dimensions......................41 
15-G Channel Dimensions, GIWW Tributary 
Channels ............. .............. 45 
15-H Dredging Operations ..................... 47 
15-1 
Navigation Page 
1. 
2. 
3. 
4. 
5. 
6. 
7. 
8. 
9. 
10. 
11. 
12. 
13. 
13A. 
13B. 
13C. 
14. 
15. 
16. 
17.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. AQUATIC PLANT CONTROL 
(SOUTHWESTERN DIVISION) 
1965 ACT 
Location. Navigable waters, tributary streams, connecting 
channels, and other allied waters in Texas and the Sabine 
River Watershed of Louisiana. 
Previous project. For details see page 699 of Annual 
Report for 1963. 
Existing project. A comprehensive project to provide for 
control and progressive eradication of water-hyacinth, 
alligatorweed, Eurasian watermilfoil, and other obnoxious 
aquatic plant growths, from navigable waters, tributary 
streams, connecting channels, and other allied waters in 
Texas in the combined interest of navigation, flood control, 
drainage, agriculture, fish and wildwife conservation, public 
health, and related purposes, including continued research 
for development of the most effective and economic control 
measures. Eradication work of hydrilla, water hyacinth and 
alligator weed continues in the Nueces River Basin, North 
Coastal Area, Guadalupe River Basin, Sabine River Basin, 
Trinity River Basin, Cypress Creek Basin, Neches River 
Basin, South Coastal Area, San Jacinto River Basin, Rio 
Grande Basin, Colorado River Basin and Brazos River 
Basin. 
Local cooperation. Sec. 302, 1965 River and Harbor Act, 
amended by Water Resources Development Act of 1986, 
applies. 
Operations during fiscal year. Eradication work by the 
State of Texas continued. Coordination of a Cooperative 
Agreement with the State for operations was initiated. 
Monitoring of the biological control nursery areas was 
continued during the year. Preliminary siting of a biological 
agent nursery for hydrilla control was accomplished. 
2. BRAZOS ISLAND HARBOR, TX 
Location. At extreme south end of coast of Texas, about 
7 miles north of mouth of Rio Grande and about 5 miles 
east of Brownsville, Texas. (See National Ocean Survey 
Chart 11301.) 
Previous project. For details see page 1017 of Annual 
Report for 1932. 
Existing project. Provides for channel dimensions in 
various sections of the waterway as shown in Table 15F. 
Project also provides for dual jetties at the gulf entrance, 
a north jetty 6,330 feet long, a south jetty 5,092 feet long, 
and 1,000-foot extension to existing north jetty and for 
maintenance of 3rd fishing harbor constructed by local 
interests. Under ordinary conditions, mean tidal range is 
about 1.5 feet, and extreme range is about 2 feet. All depths 
refer to mean low tide. To some extent, height of tides is 
dependent on the wind, and during strong "northers" in 
winter season, water surface in southern end of Laguna 
Madre may be raised 4 feet or more above mean low tide 
in the gulf. Estimated cost for new work is: Federal (Corps) 
$31,981,647, exclusive of amount expended on previous 
projects, and non-Federal $10,293,258, including $8,793,258 
contributed funds, $322,000 lands, $365,000 relocations, 
and $813,000 other costs, exclusive of amount expended on 
previous projects. (October 1, 1987 base price). 
Widening Brownsville Channel from Goose Island to 
Brownsville turning basin and deepening southeast corner 
of Brownsville turning basin to 36 feet was completed in 
April 1980. The 1,000-foot extension to existing north jetty 
was deauthorized under Section 1001 of the Water Resources 
Development Act of 1986. Work remaining consists of 
enlarging 14.8 miles of the existing Brownsville Channel 
from 36 feet by 200 feet to 42 feet by 300 feet and by 
enlarging 2.5 miles of the entrance channel from 38 feet 
by 300 feet to 44 feet by 400 feet. The turning basin would 
be enlarged to 1,200 feet at a depth of 36 feet and a north 
jetty park, jetty walkways and comfort stations would be 
constructed. (See Table 15-E for total cost of existing project 
to September 30, 1987.) 
Local cooperation. Complied with for the completed 
work. For the 42 foot project authorized by the Water 
Resources Development Act of 1986, local interests are 
required to provide lands, easements, rights-of-way, and 
material disposal areas; levees and spillways for disposal 
areas; modify or relocate utilities, roads, and other facilities, 
except railroad bridges; pay one-half of the separable and 
joint costs allocated to recreation; and bear all costs of 
operation, maintenance and replacement of recreation 
facilities, pay 25 percent of the costs allocated to deepdraft 
navigation, during construction, and pay an additional 
10 percent of the costs allocated to navigation within a period 
of 30 years following completion if not offset by credit 
allowed for lands, easements, rights-of-way, relocations and 
dredged material disposal areas. 
Terminal facilities. Numerous terminal facilities for bulk 
and liquid cargo are available. (See Port Series No. 26, 
revised 1980.) Facilities are adequate for existing commerce. 
Operations during fiscal year. New Work: See Section 
31, Planning and Engineering. 
Maintenance: Routine maintenance. Rehabilitation of the 
north and south jetties cost $2,805,999. (See Table 15-H 
for dredging operations.) 
3. CHANNEL TO PORT BOLIVAR, TX 
Location. Port Bolivar is at end of Bolivar Peninsula 
15-2

GALVESTON, TEXAS DISTRICT 
and 4 miles north of city of Galveston. Channel connects 
the port with channel in Galveston Harbor. (See National 
Ocean Survey Chart 11324.) 
Previous Project. For details see page 1856 of Appendix 
to Annual Report for 1915. 
Existing Project. Existing project dimensions for channel 
are shown in Table 15-F. (Also see Table 15-B for 
authorizing legislation.) 
Under ordinary conditions mean tidal range is about 1.3 
feet and extreme range about 2 feet. Height of tides is 
dependent largely on the wind, and during strong "northers" 
in the winter season water surface may be depressed as much 
as 2 feet below mean low tide. Enlargement of turning basin 
from 1,000 to 1,600 feet is inactive. A channel 14 feet deep, 
200 feet wide, and approximately 950 feet long is maintained 
across the east end of the turning basin to accommodate 
the Galveston-Port Bolivar ferry. Project is complete except 
for inactive portion. Project dimensions have not been 
maintained in the completed part since lesser dimensions 
are adequate for existing commerce. (See Table 15-E for 
total cost of existing project to September 30, 1987.) 
Local Cooperation. None required. 
Terminal facilities. Terminals are privately owned and 
consist of 2 slips and 2 piers. The piers, 400 feet wide by 
1,200 feet long and 210 feet wide by 1,200 feet long, are 
badly deteriorated and not in use. The slips are used as 
anchorage by shallow-draft vessels. A highway ferry landing 
owned by the State of Texas is located at south end of turning 
basin. Facilities are considered adequate for existing 
commerce. 
Operations during fiscal year. Routine maintenance. 
(See Table 15-H for dredging operations.) 
4. CORPUS CHRISTI SHIP CHANNEL, TX 
Location. This project, formerly known as the Port 
Aransas-Corpus Christi Waterway, Texas, was changed to 
Corpus Christi Ship Channel, Texas, by 1968 River and 
Harbor Act. This is a consolidation of old improvements 
of Port Aransas, Texas, and channel from Aransas Pass to 
Corpus Christi, Texas. Aransas Pass is on southern portion 
of Texas Coast,'180 miles southwest of Galveston and 132 
miles north of mouth of Rio Grande. Aransas Pass connects 
Corpus Christi Bay with the gulf. Waterway extends from 
deep water in the gulf through Aransas Pass jettied entrance, 
thence westerly 20.75 miles to and including a turning basin 
at Corpus Christi, thence westerly 1.75 miles through 
Industrial Canal to and including turning basin at Avery 
Point, thence westerly 4.25 miles to and including a turning 
basin near Tule Lake, thence northwesterly 1.8 miles to and 
including a turning basin at Viola, Texas. (See National 
Ocean Survey Charts 11308, 11309, 11311, and 11314.) 
Previous project. For details see page 1861 of Annual 
Report for 1915. 
Existing project. (See Table 15-F for existing project 
dimensions provided for in various channels and basins 
comprising this waterway.) 
Project also provides for two rubblestone jetties at Aransas 
Pass entrance, extending into the gulf from St. Joseph and 
Mustang Islands, project lengths of which are 11,190 and 8,610 
feet, respectively. Project further provides for a stone dike 
on St. Joseph Island about 20,991 feet long, connecting with 
north jetty and extending up this island to prevent a channel 
being cut around jetty. Project also provides for a breakwater 
at the entrance to the harbor area at Port Aransas, end for 
the realignment of the existing 12-foot by 100-foot project 
channel to Port Aransas. The breakwater consists of two 
overlapping sections. The one on the east side of the realigned 
entrance channel has a length of 830 feet and the second, 
located on the west side of the entrance channel, has a length 
of 1,290 feet. The channel to Port Aransas was relocated in 
the 300-foot clear distance between the overlapping sections. 
The portion of the channel remaining inside the breakwaters 
was widened to 150 feet. Under ordinary conditions, mean 
tidal range at Aransas Pass is about 1.1 feet and extreme range 
about 2 feet, and at Corpus Christi mean range about 1 foot 
and extreme about 1.5 feet. Heights of tides are dependent 
largely on strength and directions of winds, and during strong 
"northers" in the winter season water surface may be 
depressed as much as 3 feet below mean low tide. Estimated 
cost for new work is: Federal (Corps) $69,024,515, including 
$456,515 for Port Aransas Breakwaters and exclusive of 
amount expended on previous projects; and non-Federal 
$19,371,068 (includes $768 for Port Aransas Breakwaters) 
including $8,038,840 contributed funds and value of useful 
work performed, $3,320,228 lands, $6,027,000 relocations 
and $1,985,000 other cost. (October 1, 1987 base price.) 
The Port Aransas-Corpus Christi 40-foot project was 
completed in 1966. The Jewel Fulton Canal was completed 
in 1963. The Port Aransas Breakwaters were completed in 
July 1973. Work remaining consists of deepening deep-draft 
channels to 45 feet from Tule Lake Turning Basin through 
Viola Turning Basin, and constructing a mooring area at Port 
Ingleside with dolphins. Entrance and jetty channels have 
been dredged to project depth and width, and dredging of 
channel from Harbor Island through the Chemical Turning 
Basin at 45-foot depth has been completed. Initial mooring 
dolphins were completed in May 1979. Disposal area levees, 
Area 1 and Rincon were completed in August 1984. First 
stage disposal area levees, South Shore, were completed in 
September 1984. (See Table 15-E for total cost of existing 
project to September 30, 1987.) 
Local cooperation. Fully complied with except for 
provisions of Sec. 101 of 1968 River and Harbor Act and Sec. 
124 of Water Resources Development Act of 1976. 
Terminal facilities. Terminal facilities on Harbor Island 
at head of Aransas Pass, Ingleside, Corpus Christi, La 
Quinta, Avery Point, and Viola, are considered adequate for 
existing commerce. (See Port Series, No. 25, revised 1979, 
Corps of Engineers.) 
15-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Operations during fiscal year. New Work: Contract for 
berm stabilization of Rincon Levees was completed at a 
fiscal year cost of $118,045. Construction of retaining works 
at Suntide was initiated at a fiscal year cost of $730,330. 
(See Table 15-H for dredging operations.) 
Maintenance: Routine maintenance. (See Table 15-H for 
dredging operations.) 
5. DOUBLE BAYOU, TX 
Location. Enters upper Galveston Bay on the east side 
about 30 miles north of Galveston and about 8.25 miles 
south of Anahuac, Texas. 
Existing project. Project provides for a channel 7 feet 
by 125 feet from the mouth of Double Bayou to the 7-foot 
contour in Trinity Bay, a length of 3.9 miles; and a channel, 
known as West Fork, 7 feet by 100 feet for a length of 
2.0 miles. The project was completed in 1971. 
Under ordinary conditions mean tidal range is about 0.5 
feet and extreme range is about 1.2 feet. Height of tides 
is dependent largely on winds, and during strong north 
winds in the winter season, water surface may be depressed 
1.5 feet below mean low tide. (See National Ocean Survey 
Chart 11326.) 
Local cooperation. Fully complied with. 
Terminal facilities. Facilities are privately owned. At 
the mouth of the bayou is a timber wharf for loading oil 
barges. Between miles 1 and 1.5 above the mouth are 
timber wharf, a boat slip, and a marine railway owned 
by the Brown and Root Corporation. At mile 3 above the 
mouth is a small depot for handling oystershell. The facility 
consists of a timber bulkhead and hoppers for loading 
trucks. One-half mile above the mouth are several fishing 
vessel docks. 
Operations during fiscal year. Boutine maintenance. 
(See Table 15-H for dredging operations.) 
6. FREEPORT HARBOR, TX 
Location. Formed by improvement of Brazos River, 
Texas, from mouth to about 6 miles upstream to Freeport, 
Texas. (See National Ocean Survey Charts 11321 and 11322.) 
Previous projects. For details see page 1860 of Annual 
Report for 1915, and page 872 of Annual Report for 1938. 
Existing project. Existing project dimensions for various 
channels and basins are shown in Table 15-F on channel 
dimensions at end of chapter. 
Existing project also provides for: Dual jetties and a 
diversion canal for the Brazos River, including a dam, a 
lock in the dam and necessary auxiliary equipment. Also 
provides for rehabilitation of southwest jetty and the 
relocation of the northeast jetty (about 640 feet to the 
northeast); realignment of the channel between the Jetty 
Channel and Brazosport Turning Basin; realignment of the 
channel between Brazosport Turning Basin and Upper 
Turning Basin; relocation of Upper Turning Basin; and 
public use facilities adjacent to the Freeport Jetties. The 
30-foot channel from Upper Turning Basin to Stauffer 
Chemical Plant, including the turning basin, was 
deauthorized by Sec. 12 of PL 93-251. Construction of 
lock in diversion dam at local expense is considered 
inactive. 
The 38-36 foot project was completed in 1962. Work 
remaining consists of realigning, deepening and widening 
the Outer Bar and Jetty Channels; relocating the northeast 
jetty; rehabilitating the southwest jetty; realigning and 
deepening the harbor channel between the jetty channel 
and the Upper Turning Basin; relocating and enlarging the 
Upper Turning Basin; constructing a turning point near 
the northwesterly end of the jetty channel; enlarging 
Brazosport Turning Basin; deepening Brazos Harbor 
Channel; and enlarging and deepening Brazos Harbor 
Turning Basin, as authorized by the R&H Act of 1970. (See 
Table 15-E for total cost of existing project to September 
30, 1987.) 
Under ordinary conditions mean tidal range is about 1.5 
feet and extreme range is about 2.5 feet. Except under 
extreme conditions, rises on river and in diversion channel 
do not cause greater variations in water surface than those 
caused by tidal action. Estimated cost of new work is: 
$57,027,000 Federal (Corps); and $29,336,000 non-Federal, 
including $19,158,303 contributed funds, $360,249 
contributed work, $6,437,448 lands, $2,830,000 levees and 
spillways, and $550,000 relocations. (October 1, 1987 base 
price.). 
Local cooperation. Fully complied with except for 
Section 101 of River and Harbor Act of 1970, modified by 
the Water Resources Development Act of 1986. The Local 
Cooperation Agreement, executed 26 June 1986, requires 
that local interest provide lands, easements, rights-of-way, 
including land for recreation, and dredged material disposal 
areas, presently estimated at $8,950,000, modify or relocate 
utilities, roads, and other facilities, except railroad bridges, 
where necessary for construction of the project, presently 
estimated at $550,000, contribute in cash one-half of the 
separable and joint costs allocated to recreation, presently 
estimated at $370,000; and, during construction, pay 25 
percent of the construction costs allocated to deep-draft 
navigation, presently estimated at $18,030,000. 
Terminal facilities. Small privately owned wharves, two 
oil docks, one acid dock, two shell unloading docks and 
one caustic dock. Brazos River Navigation District has one 
large dock with four transit sheds over rail facilities 
permitting all-weather work. Facilities considered adequate 
for existing commerce. (See Port Series No. 26, revised 
1980, for additional facilities.) 
Operations during fiscal year. New Work: The initial 
contract for the 45 foot project, awarded in May 1987, was 
for construction of 3,700 feet of the North Jetty. Fiscal year 
cost was $999,650. 
15-4

GALVESTON, TEXAS DISTRICT 
Maintenance: Routine maintenance. (See Table 15-H for 
dredging operations.) 
7. GALVESTON HARBOR AND 
CHANNEL, TX 
Location. A consolidation of authorized improvements 
at Galveston, Texas, which includes projects formerly 
identified as Galveston Harbor, Texas; Galveston Channel, 
Texas; and Galveston seawall extension. Entrance to 
Galveston Harbor is on Gulf of Mexico on the northern 
portion of the Texas Coast. Galveston Channel extends from 
a point in Galveston Harbor between Bolivar Peninsula and 
Fort Point to and along wharf front Galveston, Texas, and 
is about 5 miles long and 1,200 feet wide. (See National 
Ocean Survey Chart 11324/5.) 
Previous projects. For details see page 1854 of Annual 
Report for 1915. 
Existing project. Provides for channel dimensions in 
sections of the waterway shown in Table 15-F. 
Also provided are: two rubble-mound jetties, the south 
one extending from Galveston Island and the north one 
extending from Bolivar Peninsula, for distances of 35,900 
feet and 25,907 feet, respectively, into the Gulf of Mexico; 
a concrete seawall from the angle at Sixth Street and 
Broadway, in the city of Galveston, to the south jetty, and 
a 16,300-foot extension of the concrete seawall in a 
southwesterly direction from 61st Street; for 11 groins along 
the gulf shore between 12th Street and 61st Street; and for 
maintenance of seawall from the angle at 6th Street and 
Broadway to the south jetty. Under ordinary conditions, mean 
tidal range in Galveston Harbor is 1.6 feet on outer bar and 
1.4 feet on inner bar with extreme ranges of 2.3 and 2.1 feet, 
respectively. Mean range in Galveston channel is about 1.3 
feet and extreme range about 2 feet under ordinary 
conditions. Height of tides in both Galveston harbor and 
channel is dependent largely on the wind, and during strong 
"northers" water surface may be depressed 2 feet below mean 
low tide. 
Existing project is complete. Dredging of Galveston 
channel to 36 foot depth was completed in November 1966. 
Dredging of the realigned entrance and Outer Bar Channel 
was completed in October 1967. Rehabilitation of the Beach 
Front Groins was completed June 1970. Dredging of 
Galveston channel to 40 feet was completed in March 1976. 
See Section 12. TEXAS CITY CHANNEL, TX regarding 
work authorized by Water Resources Development Act of 
1986. (See Table 15-E for total cost of existing project to 
September 30, 1987.) 
Local cooperation. Complied with. 
Terminal facilities. None on Galveston Harbor, which 
is entrance channel leading to terminal facilities on 
Galveston, Texas City, and Houston Ship Channels. 
Galveston Channel terminal facilities are mostly on south 
side of channel. Principal wharves, owned by the city of 
Galveston, extend from 10th to 41st Street (see Port Series 
No. 23, revised 1979). A containership terminal equipped 
with a crane capable of stacking containers three units high 
on the deck of any normal containership has been completed 
and placed into operation by the city of Galveston at Piers 
10 and 11, on the south side of Galveston Channel. The city 
of Galveston has also placed into operation a barge terminal 
equipped with two 35-ton and one 5-ton cranes for loading 
and unloading barges on Lash and Seabee ships at Pier 35 
and a docking and holding area for Lash and Seabee barges 
on Pelican Island, directly across the channel from Piers 35 
and 36. Present facilities are considered adequate for existing 
commerce. 
Operations during fiscal year. Routine maintenance. (See 
Table 15-H for dredging operations.) 
8. GULF INTRACOASTAL WATERWAY 
BETWEEN APALACHEE BAY, FL, 
AND MEXICAN BORDER 
Location. Extends from a point on Sabine River about 
3 miles below Orange, Texas, to Brownsville, Texas, about 
421 miles; a navigation channel, about 7 miles long, in 
Colorado River, extending from Matagorda, Texas, to Gulf 
of Mexico; a tributary channel in San Bernard River, 
extending from Intracoastal Waterway crossing to State 
highway bridge some 30 miles above crossing; a tributary 
channel in Colorado River extending from Intracoastal 
Waterway upstream 15.5 miles; a tributary channel extending 
about 14 miles from Intracoastal Waterway to Palacios, Texas; 
a tributary channel extending about 2 miles from Intracoastal 
Waterway to Rockport, Texas; a tributary channel extending 
about 6 miles from Intracoastal Waterway near Port Aransas, 
Texas, to town of Aransas Pass, Texas; a tributary channel 
about one-fourth mile long extending from Intracoastal 
Waterway near Port O'Connor, Texas, into Barroom Bay; 
a tributary channel extending about 38.8 miles from 
Intracoastal Waterway via Seadrift to a point in Guadalupe 
River 5.5 miles below Victoria, Texas; a harbor of refuge 
for small craft at Seadrift; a channel extending from gulf 
to Port Mansfield, Texas, about 11 miles; and a tributary 
channel in Arroyo, Colorado extending from Intracoastal 
Waterway to a point near Harlingen, Texas, about 31 miles; 
side channels in vicinity of Port Isabel, Texas, and a small 
boat basin at Port Isabel, Texas, and a tributary channel 
extending from Intracoastal Waterway main channel at a point 
in West Galveston Bay into Offatts Bayou about 2.2 miles 
with a west turnout (wye connection) 12 feet deep and 125 
feet wide between Offatts Bayou Channel and the Gulf 
Intracoastal Waterway. (See National Ocean Survey Charts 
11302, 11303, 11305, 11306, 11308, 11309, 11314, 11315, 11317, 
11319, 11322, 11326, and 11331.) 
Previous project. For details see page 1859 of Annual 
Report for 1915. (West Galveston Bay and Brazos River 
Canal, Texas.) 
15-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Existing project. Existing project dimensions provided 
for in main channel of waterway: A channel 12 feet deep 
(below mean low tide) and 125 feet wide from the Sabine 
River to Brownsville, Texas. Relocation of channel 12 feet 
deep by 125 feet wide in Matagorda Bay, miles 454.3 to 
471.3, relocation of channel 12 feet deep by 125 feet wide 
in Corpus Christi Bay, miles 539.4 to 549.7 (mileage is west 
of Harvey Lock, Louisiana); and alternate channel, 12 feet 
deep (below mean low tide) and 125 feet wide via Galveston 
Channel and Galveston Bay to the Galveston causeway; 
maintenance of existing channel 12 feet deep by 125 feet 
wide through Lydia Ann Channel, between Aransas Bay and 
Aransas Pass; provisions of such passing places, widening 
of bends, locks and guard locks, railway bridges over 
artificial cuts as are necessary, and the tributary channels 
shown in tabulation. The authorized channel 16 feet deep 
and 125 feet wide from Sabine River to Houston Ship 
Channel is inactive. (See Table 15-G on existing project 
dimensions provided for in tributary channels.) 
Removal of the railroad bridge across the canal at Mud 
Bayou was completed and operation and care of the facility 
was discontinued on April 14, 1969. Deepening the existing 
6 foot by 60 foot side channels at Port Isabel to 12 feet was 
completed February 22, 1972, Offatts Bayou channel was 
completed January 1974. Relocation of main channel across 
Corpus Christi Bay was completed in September 1976. The 
14 foot by 175 foot Channel to Aransas Pass was completed 
in April 1979. Dredging Chocolate Bayou Channel was dompleted in January 1981. Construction of a saltwater 
barrier in Chocolate Bayou was completed in February 1981. 
The 12 foot by 125 foot channel relocation route in 
Matagorda Bay has been deauthorized. The Harbor of 
Refuge at Seadrift, Texas, has been placed in the inactive 
category. Construction of jetties at mouth of Colorado River 
was completed in 1986. Active authorized work remaining 
consists of the following: Mouth of Colorado River, 
dredging a navigation channel from gulf to the GIWW; 
construction of an impoundment basin; constructing a 
turning basin at Matagorda, Texas; construction of a 
diversion dam and channel; construction of a dam at Tiger 
Island Cut; construction of an oyster cultch; and recreation 
facilities. (See Table 15-E for total cost of existing project 
to September 30, 1987.) 
Mean tidal variation is 0.5 foot at Orange, 1 foot at Port 
Arthur, 1.3 feet in Galveston Bay, 1.5 feet at Freeport, 1 
foot in Matagorda Bay, 1 foot in San Antonio Bay, 1 foot 
at Corpus Christi, 1.5 feet at Port Isabel, and 1.5 feet at 
Brownsville. Extreme ranges of tide under ordinary 
conditions are 1 foot at Orange, 1.5 feet at Port Arthur, 2 
feet in Galveston Bay, 2 feet at Freeport, 1.5 feet in 
Matagorda and San Antonio Bays, 1.5 feet at Corpus Christi, 
2 Feet at Port Isabel, and 1.5 feet at Brownsville. Height 
of tides is dependent largely on wind. Strong north winds 
have depressed water surface as much as 2 feet below mean 
low tide. Estimated cost for new work is: $79,264,000, 
Federal (Corps), including $8,414 for Port Isabel Side 
Channel, $46,559 for Port Isabel Small Boat Basin, 
$356,466 for Offatts Bayou, and $658,573 for Channel to 
Aransas Pass and excluding expenditures on previous 
projects; non-Federal $16,105,174 ($395,000 voluntarily 
expended on Gulf Intracoastal Waterway, $46,559 
contributed funds for Port Isabel, $49,665 contributed funds 
for Offatts Bayou, $347,950 contributed funds for channel 
to Aransas Pass, $3,500,000 contributed funds for Mouth 
of Colorado River, $4,699,000 lands for Gulf Intracoastal 
Waterway, $11,000 lands for Port Isabel, $4,242,000 
relocations for Gulf Intracoastal Waterway and $2,944,000 
other costs Gulf Intracoastal Waterway). (October 1, 1987 
base price.) 
Local cooperation. Fully complied with except for 
provisions of Section 101, 1968 River and Harbor Act. 
Non-Federal contributions are $395,000 for Gulf 
Intracoastal Waterway, $46,559 for Port Isabel, Texas, 
$49,665 for Offatts Bayou, Texas, $347,950 for Channel to 
Aransas Pass, Texas, and $3,500,000 for Mouth of Colorado 
River, Texas. 
Terminal facilities. There are terminal facilities at Aransas 
Pass, Port Arthur, Galveston, Port Isabel, and Brownsville. 
See Port Series No. 22 (revised 1981), Port Series No. 23 
(revised 1979), Port Series No. 25 (revised 1979) and Port 
Series No. 26 (revised 1980), Corps of Engineers. Local 
interests constructed terminal facilities at Port Mansfield and 
Port Harlingen. There are numerous privately owned piers 
and wharves along the waterway. A 330-foot navigation 
district owned general cargo dock, a 770-foot private dock 
and a 760-foot private timber trestle have recently been 
completed at the upper end of the Channel to Victoria. 
Facilities are adequate for existing commerce. 
Operations during fiscal year. New work: Contract for 
construction of jetty walkway at the Mouth of the Colorado 
River initiated at a fiscal year cost of $399,540. 
Maintenance: The Brazos River Floodgates were operated 
and maintained at a cost of $671,819, including engineering 
and design, supervision and administration, and real estate 
activities. The Colorado River Locks were operated and 
maintained at a cost of $380,465, including engineering and 
design and supervision and administration. (See Table 15-H 
for dredging operations.) 
9. HOUSTON SHIP CHANNEL, TX 
Location. Connects Galveston Harbor, at a point opposite 
Port Bolivar, with city of Houston, Texas, extending 50 miles 
northwesterly across Galveston Bay through San Jacinto 
River and Buffalo Bayou to a turning basin at head of Long 
Reach with light-draft channel 5 miles long from turning 
basin to Jenson Drive, Houston. (See National Ocean Survey 
Charts 11324/5, 11327, 11328, and 11329.) 
Previous project. For details see page 1856 of Annual 
Report for 1915. 
15-6

GALVESTON, TEXAS DISTRICT 
Existing project. Provides for channel dimensions in 
sections of the waterway shown in Table 15-F. 
Also provides for certain cut-offs, for easing sharp bends, 
an earthen dam across the upper end of Turkey Bend, and 
for off-channel silting basins as deemed necessary by the 
Chief of Engineers. Construction of 26,000 linear feet of 
pile dike to protect the channel in upper Galveston Bay was 
deauthorized by Sec. 12 of PL 93-251. The 40-foot project 
was completed in March 1966. Dredging a channel in Greens 
Bayou to Mile 1.57 was completed in 1970. Dredging Greens 
Bayou, Mile 1.57 to Mile 2.73, has been deauthorized. (See 
Table 15-E for total cost of existing project to September 
30, 1987.) 
Mean tidal range under ordinary conditions is 0.6 foot 
to 1.3 feet in lower part of Galveston Bay; 0.6 foot to 1.3 
feet in upper bay; and 0.5 to 1 foot in San Jacinto River 
and Buffalo Bayou. Extreme ranges under ordinary 
conditions are about 2 feet, 1.2 feet and 1 foot, respectively. 
Freshets caused rises of over 12 feet in Buffalo Bayou; 
however, this condition has not occurred since completion 
of Addicks and Barker Dams for flood control on upper 
watershed of Buffalo Bayou. Height of tides is dependent 
largely on the wind, and during strong "northers" in winter 
season the water surface may be depressed 2 feet below 
mean low tide. 
Local cooperation. Fully complied with. 
Terminal facilities. City of Houston and Port of Houston 
Authority operate modern terminals which supplement 
privately owned wharves, piers, and docks, as described in 
Port Series No. 24 (revised 1980), Corps of Engineers. 
Facilities are considered adequate for existing commerce. 
Operations during fiscal year. Routine maintenance. 
(See Table 15-H for dredging operations.) 
10. MATAGORDA SHIP CHANNEL, TX 
Location. This is a consolidation of shallow draft channel 
improvements of "Channel from Pass Cavallo to Port 
Lavaca, Texas," and deep draft channel improvements 
authorized under "Matagorda Ship Channel, Texas." Bar 
at Pass Cavallo is 125 miles southwest of Galveston entrance 
and 54 miles north of Aransas Pass. It connects Matagorda 
Bay with the gulf. Project extends across Matagorda Bay 
and Lavaca Bay to towns of Port Lavaca and Point Comfort. 
These two towns are on opposite sides of Lavaca Bay and 
both are about 26 miles northwest from Pass Cavallo. (See 
National Ocean Survey Chart 11316.) 
Existing project. Existing project dimensions provided 
for in various channels and basins are listed in Table 15-F 
on channel dimensions. 
Project also provides for dual jetties at entrance, south 
jetty extending 6,000 feet to 24-foot depth in the gulf and 
north jetty extending 5,900 feet to 24-foot depth. Under 
ordinary conditions mean tidal range is about 1 foot and 
extreme range about 2 feet. Height of tide is dependent 
largely on the wind, and during strong "northers" in winter 
season the water surface may be depressed 2 feet below 
mean low tide. Estimated cost for new work is: $18,058,777 
Federal (Corps), and $12,859,000 non-Federal, including 
$12,259,619 contributed funds, $182,000 for lands, $220,000 
for relocations, and $196,581 other costs. The project was 
completed in March 1967 
Local cooperation. Fully complied with. 
Terminal facilities. Privately owned facilities at Port 
Lavaca, municipally owned facilities at mouth of Lynn 
bayou, privately owned and publicly owned facilities at Point 
Comfort, Texas. These facilities are considered adequate 
for present commerce. Facilities at Point Comfort consist 
of a channel, turning basin with wharfs, oil dock and loading 
equipment, all owned by Aluminum Company of America; 
and a wharf built by local interest at Point Comfort turning 
basin. 
Operations during fiscal year. Routine maintenance. 
(See Table 15-H for dredging operations.) 
11. SABINE-NECHES WATERWAY, TX 
Location. This is a consolidation of old improvements 
of "Harbor at Sabine Pass and Port Arthur Canal" and 
"Sabine-Neches Canal, including Sabine River to Orange 
and Neches River to Beaumont, Texas." Sabine Pass is on 
Gulf of Mexico about 58 miles east of Galveston and 280 
miles west of Southwest Pass, Mississippi River. It connects 
Sabine Lake with gulf. Port Arthur canal extends '1 miles 
from near upper end of Sabine Pass to Port Arthur docks 
at mouth of Taylors Bayou. Near its upper end, Sabine- 
Neches canal joins and extends to mouths of Neches and 
Sabine Rivers. Waterway next extends up Neches River to 
Beaumont and up Sabine River to Orange. (See National 
Ocean Survey Charts 11341, 11342, and 11343.) 
Previous projects. For details see page 1863 of Annual 
Report for 1915, page 985 of Annual Report for 1916, and 
page 873 of Annual Report for 1926. 
Existing project. Existing project dimensions provided 
for in various channels and basins are set forth in Table 15-F 
on channel dimensions. Project also provides for two stone 
jetties at Sabine Pass entrance from the gulf, western jetty 
to be 21,905 feet long and eastern jetty 25,310 feet long. 
Project further provides for removal of guard lock in 
Sabine-Neches Canal, construction of suitable permanent 
protective works along Sabine Lake frontage owned by city 
of Port Arthur to prevent dredged material from entering 
Sabine Lake and to prevent erosion of material deposited, 
reconstruction of Port Arthur Bridge, and relocation of Port 
Arthur field office. Mean tidal variation at entrance is about 
1.5 feet, at Port Arthur about 1 foot, and at Orange and 
Beaumont about 0.5 foot. Prolonged north winds during 
winter season have depressed water surface as much as 3.4 
feet below mean low tide while tropical disturbances have 
caused heights as much as 8 feet above mean low tide. 
15-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Existing project is complete. Removal of obstructive 
bridge at Port Arthur was completed May 1969. The high 
level fixed bridge across Sabine-Neches Canal was 
completed October 1970. Deepening project to 40 feet was 
completed April 1972. (See Table 15-E for total cost of 
existing project to September 30, 1987.) 
Local cooperation. Complied with. 
Terminal facilities. See volume 2, Port Series No. 22 
(revised 1981), Corps of Engineers. Facilities are considered 
adequate for present commerce. 
Operations during fiscal year. Routine maintenance. 
Rehabilitation of levees, Sabine Lake South Disposal Area 
cost $1,388,995. (See Table 15-H for dredging operations.) 
12. TEXAS CITY CHANNEL, TX. 
Location. Texas City is on the mainland of Texas on 
west side of Galveston Bay, about 10 miles northwest of 
city of Galveston. (See National Ocean Survey Charts 
11324/5.) 
Previous projects. For details see page 1856 of Annual 
Report for 1915. 
Existing project. Provides for channel 40 feet deep, 400 
feet wide and about 6.75 miles long, from Bolivar Roads 
to a turning basin at Texas City, 40 feet deep, 1,000 feet 
to 1,200 feet wide and 4,253 feet long; and an Industrial 
Canal, 40 feet deep and 300-400 feet wide extending a 
distance of 1.7 miles southwestward from the south end 
of Texas City Turning Basin, and a turning basin, 40 feet 
deep, 1,000 feet wide and 1,150 feet long. 
Project also provides for easing the approach to the 
turning basin; a pile dike 28,200 feet long, parallel to and 
north of the channel; and a rubble-mound dike, 27,600 
feet long, along the southerly side of the pile dike. 
The 40-foot channel was completed in June 1967. 
Widening the Texas City Turning Basin; realigning the 
Texas City Turning Basin to a location 85 feet easterly 
from its present position; and enlargement through 
widening and deepening of the Industrial Canal and basins 
was initiated in July 1980 and completed in June 1982. 
The only work remaining is deferred construction 
consisting of widening the Industrial Canal from 250 feet 
to 300 feet at 40 foot depth. 
Work authorized by Water Resources Development Act 
of 1986 would modify the project by providing for 
deepening the Texas City Turning Basin to 50 feet, 
enlarging the 6.7-mile long Texas City Channel to 50 feet 
by 600 feet, deepening the existing 800-foot wide Bolivar 
Roads Channel and Inner Bar Channel to 50 feet, deepening 
the existing 800-foot wide Outer Bar and Galveston 
Entrance Channels 52 feet, and extending the Galveston 
Entrance Channel to a 52-foot depth for 4.1 miles at a 
width of 800 feet and a additional reach at a width of 600 
feet to the 52 foot contour in the Gulf of Mexico. 
Establishment of 600 acres of wetland and development 
of water-oriented recreational facilities on a 90-acre 
enlargement of the Texas City Dike are also proposed. (See 
Table 15-E for total cost of existing project to September 
30, 1987.) 
Under ordinary conditions mean tidal range is about 1.3 
feet and extreme range is about 2 feet. Height of tide is 
dependent largely on the wind and during strong "northers" 
water surface may be depressed 2 feet below mean low 
tide. Estimated cost for new work is $122,700,000 Federal 
(Corps), excluding expenditures on previous projects, and 
$73,893,700 non-Federal, including $61,827,741 contributed 
funds, $248,000 work contribution, $427,959 lands, 
$10,464,000 levees and spillways, $6,000 for removal of 
barge mooring facilities from Snake Island, $545,000 for 
berthing areas, and $375,000 relocations. 
Local cooperation. Fully complied with for completed 
work. For work authorized by the Water Resources 
Development Act of 1986, local interests are required to 
provide levees for desposal areas and wetlands; relocate 
utilities, roads, and other facilities, except railroad bridges; 
provide berthing areas; pay one-half of the separable and 
joint costs allocated to recreation; and bear all costs of 
operation, maintenance and replacement of recreation 
facilities, and, during construction, pay 25 percent of the 
costs allocated to deep-dragft navigation to a depth of 45 
feet plus 50 percent of the costs allocated to deep-draft 
navigation deeper than 45 feet; pay an additional 10 percent 
of the costs allocated to deep-draft navigation within a 
period of 30 years following completion if not offset by 
credit allowed for lands, easements, rights-of-way, 
relocations and disposal areas; and pay 50 percent of the 
costs incurred for operation and maintenance below the 
45-foot depth. 
Terminal facilities. Privately owned terminal facilities 
are on the mainland at inner end of this channel and are 
considered adequate for existing commerce. A deep-draft 
channel and turning basin extend about 1.9 miles 
southwestward from south end of Texas City Turning Basin 
have been constructed by local interests. See Port Series 
No. 23 (revised 1979), Corps of Engineers. 
Operations during fiscal year. New Work: See Section 
31, Planning and Engineering. 
Maintenance: Routine maintenance. (See Table 15-H for 
dredging operations.) 
13. TRINITY RIVER AND 
TRIBUTARIES, TX 
Location. The main stem of the Trinity River is formed 
at Dallas by the confluence of the West Fork and the Elm 
Fork at river mile 505.5. The mouth of the Trinity is about 
one-half mile west of Anahuac, Texas. (See Geological 
Survey base map, Texas, scale 1:500,000.) 
Previous project. For details of abandoned locks and 
dam construction see page 986 of Annual Report for 1932. 
15-8

GALVESTON, TEXAS DISTRICT 
Existing project. See individual detailed reports on 
Anahuac Channel, Channel to Liberty and Wallisville Lake. 
Project includes the existing Federal project designated as 
"Mouth of Trinity River, Texas," which was completed in 
1907 at a cost of $80,000 (no cost to local interest). Project 
is not being maintained. (See Table 15-E for total cost of 
existing project to September 30, 1986.) 
Local cooperation. See individual detailed reports on 
Channel to Liberty and Wallisville Lake. There is no local 
cooperation required for Anahuac Channel. 
Terminal facilities. Privately owned wharves and piers 
at Anahuac, Moss Bluff, Wallisville, and Liberty, Texas, 
are adequate for existing commerce. 
13A. ANAHUAC CHANNEL, TX 
Location. Extends from 6-foot depth in Galveston Bay 
to Anahuac, Texas, opposite mouth of Trinity River 38 miles 
north of Galveston, Texas. (See National Ocean Survey 
Chart 11323.) 
Existing project. No project dimensions authorized by 
1905 River and Harbor Act. A 6- by 80-foot channel, 16,000 
feet long was dredged in 1905. At present a 6- by 100-foot 
channel is maintained. Under ordinary conditions tidal range 
is 0.6 to 1.2 feet. Height of tide is dependent largely on wind. 
Strong north winds depress water surface 1.5 feet below 
mean sea level. Latest published map is in House Document 
440, 56th Congress, 1st Session. Project was completed in 
1911. 
Local cooperation. None required. 
Terminal facilities. Privately owned wharves and piers 
are the only terminal facilities at Anahuac. 
Operations during fiscal year. Routine maintenance. 
(See Table 15-H for dredging operations.) 
13B. CHANNEL TO LIBERTY, TX 
Location. Improvement is located in Galveston Bay and 
tidal reach of lower Trinity River. (See Geological Survey 
Maps for Anahuac, Cove, Moss Bluff, and Liberty, Texas.) 
Previous projects. For details see page 986 of Annual 
Report for 1932. 
Existing project. Provides for a 6-foot channel from 
Anahuac to Liberty which was completed in 1925. A 
navigable channel from the Houston Ship Channel near Red 
Fish Bar in Galveston Bay to Liberty, Texas, with depth of 
9 feet and width of 150 feet, extending along the east shore 
of Trinity Bay to the mouth of the Trinity River at Anahuac, 
thence in the river channel to a turning basin at Liberty, 
Texas, and a protective embankment along the west side of 
the channel in Trinity Bay. 
The 6-foot Channel to Liberty was completed in 1925. 
The 9-foot Channel to Liberty has been dredged from 
junction with Houston Ship Channel to a point one mile 
below Anahuac, Texas. Work remaining consists of dredging 
a 9- by 150-foot channel from one mile below Anahuac, 
Texas to Liberty, Texas. 
Local cooperation. Fully complied with for portion of 
"Channel to Liberty" between Houston Ship Channel and 
1 mile below Anahuac, Texas, as required by 1946 River 
and Harbor Act (H. Doc. 634, 79th Cong., 2nd Sess.), 
but not complied with for remaining portion of "Channel 
to Liberty" as required by River and Harbor Act of 1945 
(H. Doc. 403, 77th Cong., 1st Sess.) at an estimated total 
cost of $550,000, of which $460,000 is for lands and 
rights-of-way and $90,000 for pipeline relocations for 9- 
by 150-foot channel. 
Terminal facilities. Privately owned wharves and docks 
at Anahuac, Wallisville, Texas Gulf Sulphur Co.'s slip, Moss 
Bluff and Liberty, Texas, are adequate for existing 
commerce. 
Operations during fiscal year. Routine maintenance. 
(See Table 15-H for dredging operations.) 
D13C. WALLISVILLE LAKE, TX 
Location. Dam is at river mile 3.9, about 4 miles 
northwest of Anahuac, Texas. (See National Ocean Survey 
Chart 11323.) 
Existing project. Provides for construction of a dam 
and overflow spillway approximately 8 miles long to prevent 
salinity intrusion and create a 5,600-acre reservoir. The 
maximum pool elevation will be 4 feet above National 
Geodetic Vertical Datum. Project provides for an 84 foot 
by 600-foot navigation lock to facilitate navigation on 
Channel to Liberty. The sill has a depth of minus 16 feet 
below National Geodetic Vertical Datum. Project also 
provides for two recreational areas. Dam controls a 
drainage area of 1,262 square miles below Livingston Dam 
(non-Federal project at channel mile 99.2) and has a 
storage capacity of 58,000 acre-feet. Under ordinary 
conditions mean tidal range in bay is from 0.6 foot to 1.2 
feet. Height of tide is dependent largely on wind. Strong 
northerly winds depress water surface 1.5 feet below mean 
sea level. Total estimated cost of authorized project is 
$69,300,000 Federal (Corps). (October 1, 1987 base price.) 
A contract for construction of access road, Big Hog 
intake structure, intake canal and access bridge was 
completed in October 1968. Work started in July 1970 on 
construction of the lock and dam, roads, diversion channel, 
and navigation channel. Work was suspended in February 
1973 because of an injunction halting construction. 
Protective work on the lock and dam was permitted and 
was completed in April 1973. An exception to the injunction 
was granted for plugging oil wells which was completed 
in August 1973. Notice of appeal to the Court of Appeals 
for the Fifth Circuit was filed in April 1973. In August 
1974, the Court of Appeals reversed the judgment and 
remanded the case with directions that a revised or 
supplemental statement be prepared and judged anew. Final 
15-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
supplement to the Environmental Impact Statement for the 
modified project authorized in the Supplemental 
Appropriations Act, 1983 (PL 98-63) was submitted to the 
Environmental Protection Agency on September 21, 1983. 
In March 1986, the Court rendered it Memorandum of 
order continuing the injunction and directing the Corps to 
re-commence the administrative process at the time when 
the first departure from standard NEPA procedures occurred 
prior to the 1983 legislative action. The Corps and local 
sponsors perfected an appeal to the U.S. Court of Appeals 
and on May 11, 1987, the Court of Appeals ruled in favor 
of the Corps and dismissed the suit in its entirety. 
Local cooperation. Local interest must contribute an 
amount equal to cost allocated to water supply, one-half of 
cost allocated to salinity control and cost allocated to 
recreation less cost of basic facilities and less 15 percent of 
total project cost. Local interest contribution is estimated 
at $9,530,000. 
Operations during fiscal year. New Work: Plans and 
specifications for the non-overflow dam, Interstate 10 to the 
Lock site, were approved in May 1986. Further work has 
been deferred pending receipt of construction funds. 
Maintenance: Ranger surveillance, administration of 
project, and administration of duck blind permit program 
was conducted. 
14. RECONNAISSANCE AND 
CONDITION SURVEYS 
Reconnaissance and Condition Surveys were conducted 
on the following projects: 
Project 
Texas City Channel 
Date of Survey 
Mar-Jun 1987 
Fiscal 
Year 
Cost 
$37,622 
15. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Section 107, Public Law 
86-645 (preauthorization). 
Intitial reconnaissance studies of the feasibility of 
navigation channel improvements on the Gulf Intracoastal 
Waterway near Bridge Harbor Marina at Freeprot, Texas 
and on the Sabine River Channel at Orange, Texas were 
initiated at fiscal year cost of $3,338 and $1,104, 
respectively. 
Reconnaissance studies of the feasibility of navigation 
improvements on Matagorda and Lavaca Channels, Calhoun 
County, Texas were completed at a fiscal year cost of 
$8,945. Studies have been terminated. 
15-10

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Beach Erosion Control 
16. CORPUS CHRISTI BEACH, TX 
(RESTORATION PROJECT) 
Location. Corpus Christi Beach, a shore area having 
a length of about 2 miles, is located on the west side 
of Corpus Christi Bay in Nueces County at Corpus Christi, 
Texas. (See National Ocean Survey Charts 11309 and 11311.) 
Existing project. The plan of improvement provided 
for initial restoration of eroded areas of Corpus Christi 
Beach, over a shore length of 1.4 miles, located on the 
easterly side of Rincon Peninsula, with periodic 
nourishment as required. Construction was completed in 
March 1978. Periodic nourishment and construction of 
sand retention groin was completed in November 1985. 
Estimated cost of new work is $2,150,000 Federal (Corps) 
and $2,265,000 non-Federal consisting of $2,150,000 
Contributed funds, $43,000 relocations, and $72,000 lands. 
(October 1,1987 base price.) 
Local cooperation. Fully complied with. 
Operations during fiscal year. Monitoring of accretion 
and erosion was performed by field survey. 
17. BEACH EROSION WORK UNDER 
SPECIAL AUTHORIZATION 
Beach erosion activities pursuant to Section 103, Public 
Law 87-874: 
Initial appraisal studies of a beach erosion control project 
at Rockport, Texas, were completed at a fiscal year cost 
of $7,500. 
Reconnaissance studies of the feasibility of a beach 
erosion control project at Shoreacres, Texas, were initiated 
at a fiscal year cost of $14,137. 
15-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Flood Control 
18. BUFFALO BAYOU AND 
TRIBUTARIES, TX 
Location. Improvements are on Buffalo Bayou watershed, 
a part of San Jacinto River watershed, in Harris County, 
west and northwest of city of Houston, Texas. (See 
Geological Survey quadrangle sheets for Harris County.) 
Existing project. Provides for improvement of Buffalo 
Bayou and its tributaries above turning basin of Houston 
Ship Channel to control floods for protection of city of 
Houston, and prevent deposition of silt in turning basin of 
ship channel by construction of detention reservoirs, 
enlargement and rectification of channels and construction 
of control works. Estimated cost of new work is $149,700,000 
Federal (Corps) including $11,900,000 for recreational 
facilities at completed projects (Code 713 funds) and 
$10,800,00 for Dam Safety Assurance, and $98,791,000 non- 
Federal, consisting of $86,891,000 for lands and relocations, 
and $11,900,000 contributions for recreational facilities. 
(October 1, 1987 base price.) 
Construction of Barker Dam was completed in February 
1945. Construction of Addicks Dam and 7.4 miles of channel 
rectification downstream from Addicks and Barker Dams 
was completed in October 1948. Modification of Barker and 
Addicks Dams consisting of gating of two uncontrolled 
conduits in each dam, was completed in 1969. Channel 
rectification on White Oak Bayou was completed in 1976. 
Major rehabilitation of Addicks and Barker Dams to prevent 
seepage through the embankment was completed in 1982. 
Work remaining consists of rectification of approximately 
22 miles of main stem of Buffalo Bayou. Work under the 
Dam Safety Assurance program was initiated in Fiscal Year 
1986. Work to be accomplished includes raising 
approximately 32,400 feet of Addicks Dam 1 to 3 feet and 
raising approximately 57,600 feet of Barker Dam 3 to 5 feet 
and armor-plating low ends of both dams. A contract with 
the city of Houston for cost-sharing in the construction of 
recreation facilities at Cullen Park was entered into in 
November 1981. The lease for approximately 10,534 acres 
of land and water areas was approved in February 1983. 
Local cooperation. Section 203, 1954 Flood Control Act 
applies. Local interests have accomplished all required local 
cooperation on Brays Bayou and White Oak Bayou. On 
Buffalo Bayou, local interests purchased interests that the 
United States had in 7 miles of rectified channel below 
Barker and Addicks Dams for $256,651. Of the remaining 
required rights-of-way on Buffalo Bayou, local interests 
have acquired about 40 percent. About 53 percent of 
required bridge relocations and 3 percent of the required 
utility relocations have been accomplished. Advance of 
$4,400,000 by the Harris County Flood Control District was 
refunded in September 1956. Public Law 86-53 authorized 
reimbursement of $38,726 to Galveston, Houston and 
Henderson Railroad Company for bridge alterations at Brays 
Bayou. Non-Federal contributions totaled $63,661 for 
project betterments. Recreation development is subject to 
conditions of non-Federal cost-sharing under Federal Water 
Project Recreation Act of 1965. 
Operations during fiscal year. Recreation: Community 
Park West (Phase IB) and the velodrome were completed 
in November 1986. Grading and clearing for an archery 
range was performed by the City of Houston in March and 
April 1987. A construction contract was awarded for 
Community Park West (Phase 2), but no work was 
accomplished. 
Dam Safety Assurance: Raising Main Dam, Barker Dam, 
awarded in June 1986, continued during fiscal year 1987 at 
a cost of $782,800. Raising Main Dam, Addicks Dam, 
awarded in July 1986, continued during fiscal year 1987 at 
a cost of $722,980. Contract for armor plating the ends of 
the dams was awarded in May 1987. Fiscal year cost was 
$715,870. 
Maintenance: Routine operations and maintenance at 
Addicks and Barker Dams. 
19. CLEAR CREEK, TX 
Location. The project is located about midway between 
the two metropolitan centers of Houston, Texas, on the north 
and Galveston-Texas City on the south in Harris and 
Galveston Counties above and below existing Clear Lake. 
Existing Project. The authorized plan of improvement 
consists of an improved channel from Mile 3.8 to Mile 34.8 
to contain within its banks all flood flows up to and including 
that of a 100-year flood. The selected plan provides channel 
enlargement and easing of bends within the existing stream 
from Mile 3.8 to Mile 26.05 to contain at least the 10-year 
frequency storm, and additional outlet with gated structure 
from Clear Lake to Galveston Bay, restriction of 
development in the residual 100-year flood plain and 
measures to mitigate environmental effects. In 1986, at the 
request of Brazoria County Drainage District No. 4, that 
portion of the project upstream of the Brazoria/Galveston 
County line, approximate improved Mile 18.5, was placed 
in the "inactive" category. Estimated cost for new work, 
excluding "inactive" portion, is $44,900,000 Federal 
(Corps) and $40,470,000 non-Federal consisting of 
$5,170,000 cash contributions, $16,200,000 for lands, and 
$19,100,000 for relocations (October 1, 1987 base price). 
Local Cooperation. Local sponsors for the project are 
Galveston and Harris counties. The Local Cooperation 
Agreement, executed 30 June 1986, requires local interests 
to provide lands, easements, rights-of-way, and material 
15-12

GALVESTON, TEXAS DISTRICT 
disposal areas; modify or relocate building, pipelines, 
utilities, roads and other facilities, except railroad bridges, 
where necessary in the construction of the project; make 
a cash contribution for mitigation measures consistent with 
the non-Federal share of total project costs without 
mitigation measures; pay five percent of the total costs 
allocated to flood control; and bear all costs of operation 
and maintenance of flood control facilities. 
Operations during fiscal year. Engineering and Design 
is underway. 
20. LOWER RIO GRANDE 
BASIN, TX 
Location. The project is located in Willacy, Hidalgo 
and Cameron Counties. The basin is bounded on the east 
by the Gulf of Mexico, on the south by the Rio Grande 
which forms the international boundary between the United 
States and Mexico, on the west by Starr County, and on 
the north by Brooks and Kenedy Counties. 
Existing project. The authorized plan of improvement 
consists of channel improvements to: (1) provide drainage 
protection for the area in Hidalgo and Willacy Counties 
north of U.S. Highway 83, and for the area between U.S. 
Highway 83 and the Rio Grande in Hidalgo County; and 
(2) provide flood protection for the cities of McAllen, 
Edinburg, Raymondville, Edcouch, La Villa, and Lyford. 
Estimated cost for new work is $130,000,000 Federal 
(Corps) and $72,800,000 non-Federal consisting of 
$13,800,000 cash contribution, $31,000,000 for lands, and 
$28,000,000 for relocations (October 1, 1987 base price). 
Local cooperation. Local sponsors for the project are 
Hidalgo County Drainage District No. 1 and Willacy 
County Drainage District No. 1. In accordance with the 
cost-sharing and financing concepts of the Water 
Resources Development Act of 1986, local interests are 
required to provide lands, easements, and rights-of-way; 
modify or relocate buildings, pipelines, utilities, roads 
and other facilities, except railroad bridges; provide a cash 
contribution presently estimated at $13,800,000; and bear 
all costs of operation, maintenance, and replacement of 
flood control facilities. 
Operations during fiscal year. Phase I General Design 
Memorandum was approved by the Board of Rivers and 
Harbors in April 1983. Project is awaiting Planning and 
Engineering funds. 
21. PORT ARTHUR AND VICINITY, TX, 
(HURRICANE-FLOOD 
PROTECTION) 
Location. Port Arthur is on west shore of Sabine Lake 
in extreme southeast part of Texas, about 14 miles from 
the gulf. Area under consideration is comprised of about 
38,500 acres, and includes cities of Port Arthur and 
Groves, towns of Griffing Park, Pearl Ridge, and 
Lakeview, and adjacent industrial areas. 
Existing project. Authorized plan provides for raising 
and reconstructing 6.3 miles of existing concrete and steel 
sheet-pile seawall; constructing 0.3 mile of new concrete 
and sheet-pile seawall; raising and improving 3.0 miles 
of existing earth levees; constructing 20.3 miles of new 
earth levees and constructing five interior drainage 
pumping plants. Raising and strengthening of levees 
surrounding Gulf Oil Company's fresh water reservoir was 
placed in the "inactive" category in December 1980. The 
project was initiated in March 1966 and the active portion 
of the project was completed in 1984. Estimated cost for 
new work, excluding "inactive" portion, is $59,703,000 
Federal (Corps) and $26,036,000 non-Federal consisting 
of $16,016,000 cash contributions, $3,403,000 for lands, 
$6,168,000 for relocations, and $449,000 for pumping 
station betterments and levee realignment betterments. 
Local cooperation. Fully complied with. 
Operation during fiscal year. No work was performed. 
22. SIMS BAYOU, TX 
Location. The project is located in Harris County, in 
the southern portion of Houston, Texas. 
Existing project. The authorized plan of improvement 
provides for enlargement and rectification, with appropriate 
erosion control measures, of 19.31 miles of Sims Bayou 
to provide 25-year flood protection; environmental 
measures and reparian habitat improvement along the 
entire alignment; and recreational development to include 
27 miles of hike and bike trails connecting to existing 
public parks, together with picnic, playground, and other 
outdoor leisure facilities. Estimated cost for new work 
is $97,100,000 Federal (Corps) and $33,900,000 non- 
Federal consisting of $17,200,000 cash contributions, 
$11,960,000 for lands, and $4,740,000 for relocations 
(October 1, 1987 base price). 
Local cooperation. Local sponsor for the project is 
Harris County Flood Control District. In accordance with 
the cost-sharing and financing concepts reflected in the 
Water Resources Development Act of 1986, local interests 
are required to provide lands, easements, and rights-ofway; 
modify or relocate buildings, pipelines, utilities, 
roads, and other facilities, except railroad bridges, where 
necessary for the construction of the project; pay onehalf 
of the separable and joint costs allocated to recreation; 
and bear all costs of operation, maintenance and 
replacement of recreation facilities; and pay 12 percent 
of the costs allocated to flood control to bring the total 
non-Federal share of flood control costs to 25 percent; 
and bear all costs of operation, maintenance and 
replacement of flood control facilities. 
Operations during fiscal year. See Section 31, Planning 
and Engineering. 
15-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
23. TAYLORS BAYOU, TX 
Location. Watershed of Taylors Bayou is in extreme 
southeast corner of Texas adjoining basins of Neches River 
and Sabine Lake on the east. City of Port Arthur is about 
8 miles from the main stream of Taylors Bayou. 
Existing project. Improvement consists of enlarging and 
rectifying approximately 53 miles of natural and artificial 
channels on Taylors Bayou and tributary water courses. 
Phase I consists of constructing a gated structure to prevent 
saltwater intrusion and 2.9 miles of new diversion channel 
and enlarging 1.8 miles of Gulf Intracoastal Waterway and 
a 1.9 mile section of the Outfall Canal. Phase II consists 
of enlarging 6.0 miles of Taylors Bayou, 14.3 miles of 
Hillebrandt Bayou, 1.5 miles of Pivotot Bayou, 2.3 miles 
of Bayou Din, and 3.5 miles of Willow Marsh Bayou. Phase 
III consists of enlarging 7.0 miles of North Fork Taylors 
Bayou, 7.8 miles of South Fork Taylors Bayou and 4.4 miles 
of Mayhaw Bayou. The Phase III portion of the project was 
placed in the "inactive" category in November 1980. Initial 
contract on the "active" portion of the project was awarded 
in August 1982. Estimated cost for new work, excluding 
inactive portion, is $40,400,000 Federal (Corps) and 
$22,000,000 non-Federal, including $13,800,000 cash 
contribution, $4,360,000 lands, and $3,840,000 for 
relocations. (October 1, 1987 base price.) 
Local cooperation. Section 204, 1965 Flood Control Act, 
applies. 
Operation during fiscal year. Clean-up dredging of 
Outfall Canal cost $140,618. Channel rectification, Taylors 
Bayou to Hillebrandt and Taylors Bayou Diversion Channel 
(Sta. 135+00 to 152+00) cost $5,188,298. 
21. TEXAS CITY AND VICINITY, TX 
(HURRICANE-FLOOD PROTECTION) 
Location. On the west and southwest shore of Galveston 
Bay, about 9 miles northwest of Galveston, Texas. Project 
fronts on the west side of Galveston Bay and protects a land 
area of about 36 square miles. 
Existing project. Plan provides for construction of 
improvements for control of storm tides. Improvements 
consist of 15.9 miles of new levees, 1.3 miles of concrete 
floodwall, related drainage and stoplog structures, one tide 
control structure, and twQ pumping plants. The project was 
initiated in 1962, and physically completed in 1987. 
Estimated cost for new work is $37,982,000 Federal (Corps) 
and $16,627,000 non-Federal, including $13,937,000 cash 
contribution, $1,071,000 work contribution, and $1,363,000 
for lands, and $256,000 for ramps in lieu of closure 
structures and increased low flow pumping capacity for La 
Marque Pumping Plant. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Contract for upgrading 
a local sponsor's pumping station cost $169,640. 
25. UPPER WHITE OAK BAYOU, TX 
Location. The project is located in Harris County, in 
the northwest portion of Houston, Texas. 
Existing project. The authorized plan of improvement 
provides for channel improvements in White Oak Bayou 
from Mile 10.7 to Mile 19.9; on Cole Creek from its mouth 
to Mile 4.9; and on Vogel Creek from its mouth to Mile 
4.5. In addition, the project includes regulation of the 
residual 100-year flood plains along these streams and 
recreational development on project lands along White Oak 
Bayou, between Mile 14.6 and Mile 18.3. Estimated cost 
for new work is $70,200,000 Federal (Corps) and 
$23,900,000 non-Federal consisting of $13,100,000 cash 
contribution, $6,920,000 for lands, and $3,880,000 for 
relocations (October 1, 1987 base price). 
Local cooperation. Local sponsor for the project is 
Harris County Flood Control District. In accordance with 
the cost-sharing and financing concepts reflected in the 
Water Resources Development Act of 1986, local interests 
are required to provide lands, easements, and rights-ofway; 
modify or relocate buildings, pipelines, utilities, roads, 
and other facilities, except railroad bridges; make a cash 
contribution, which when combined with lands required 
for recreation equals one-half of the separable and joint 
costs allocated to recreation; and during construction, pay 
13 percent of the costs allocated to flood control to bring 
the total non-Federal share of flood control costs to 25 
percent. 
Operations during fiscal year. See Section 31, Planning 
and Engineering. 
26. VINCE AND LITTLE VINCE 
BAYOUS, TX 
Location. Watershed of Vince Bayou and tributary, Little 
Vince Bayou, has an area of about 17 square miles and lies 
entirely within Harris County. Vince Bayou is a minor 
tributary of Buffalo Bayou in San Jacinto River Basin on 
upper gulf coast of Texas. 
Existing project. Project provides for enlarging and 
rectifying channel of Vince Bayou from mouth to a point 
about 7.3 miles upstream and Little Vince Bayou from mouth 
to a point about 4.2 miles upstream, a total distance in both 
streams of about 11.5 miles. The project was initiated in 
1968. All work on Vince Bayou is complete. Estimated cost 
for new work is $19,313,000 Federal (Corps) and $17,300,000 
non-Federal, consisting of $5,100,000 for lands and 
$12,200,000 for relocations. (October 1, 1987 base price.) 
Local cooperation. Fully complied with. 
Operations during fiscal year. Contract for channel 
rectification on Little Vince Bayou, Mile 0 to Mile 0.7 was 
completed at a fiscal year cost of $222,292. Contract for 
channel rectification on Little Vince Bayou, Mile 2.7 to Mile 
3.1 was completed at a fiscal year cost of $875,187. Contract 
15-14

GALVESTON, TEXAS DISTRICT 
for channel rectification on Little Vince Bayou, Mile 3.1 to 
Mile 4.2 was initiated at a fiscal year cost of $604,540. Local 
sponsor, Harris County, was reimbursed $223,258 for 
Federal work eliminated by a locally constructed box culvert. 
27. INSPECTION OF COMPLETED 
FLOOD CONTROL WORKS 
Inspections of completed projects operated and maintained 
by local interests were made on the following projects. Fiscal 
year cost was $122,086. ,.. 
Project 
Uate Of 
Inspection 
Tranquitas Creek, Kingsvile, TX October 1986 
Highland Bayou Diversion Channel, TX October 1986 
Vince and Little Vince Bayou, TX December 1986 
Big Hog Bayou, Wallisville, TX December 1986 
Port Arthur Hurricane-Flood Protection, TX January 1987 
Little Cypress Bayou, Orange, TX January 1987 
Guadalupe River Flood Protection, Victoria, TX February 1987 
Brays Bayou Channel Rectification, Houston, TX April 1987 
Texas City Hurricane-Flood Protection, TX April 1987 
Colorado River, Flood Protection, 
Matagorda, TX May 1987 
Guadalupe River (Log Jams), TX May 1987 
Galveston Seawall, Galveston, TX June 1987 
Three River, Flood Protection, TX July 1987 
Lavaca-Navidad River Flood Protection, 
Halletsville, TX August 1987 
White Oak Bayou, Channel Rectification, 
Houston, TX August 1987 
Freeport Hurricane-Flood Protection, TX September 1987 
28. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to Section 205 of 1970 
Flood Control Act, Public Law 858, 80th Congress, as 
amended: 
A Local Cooperation Agreement was prepared for a flood 
control project at Kirbyville, Texas, at a fiscal year cost of 
$1,734. 
Initial reconnaissance studies of the feasibility of flood 
control projects on Baldridge Creek and Waelder Branch 
at Waelder, Texas; on Sam Bell Gully at Oakridge North, 
Texas; on the Lower Guadalupe River, Texas; at East 
Matagorda Bay, Texas; and on Buckners Creek in Fayette 
County, Texas were completed at fiscal year cost of $7,426, 
$3,595, $8,843, $8,939, and $10,000, respectively. All studies 
have been terminated. 
An initial reconnaissance study of the feasibility of a flood 
control project at Pinewood Estates, Texas was initiated at 
a fiscal year cost of $9,531. 
Reconnaissance studies of the feasibility of a flood control 
project at Taylor Lake Village were continued at a fiscal 
year cost of $32,274. 
Emergency flood control activiteis - repair, flood 
fighting, and rescue work (Public Law 99, 84th Congress 
and antecedent legislation). 
Costs were $199,184 for disaster preparedness and 
$16,417 for emergency operations. 
Rehabilitation work for Brays and White Oak Floodways 
cost $116,697. 
29. EMERGENCY STREAM BANK AND 
SHORELINE EROSION WORK 
UNDER SPECIAL AUTHORIZATION 
Stream bank and shoreline erosion activities pursuant to 
Section 14 of the 1946 Flood Control Act, Public Law 526, 
as amended: 
An appraisal report on the feasibility of bank stabilization 
measures on the Brazos River at East Columbia, Texas, was 
completed at a fiscal year cost of $7,470. The study has been 
terminated. 
15-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
General Investigations 
30. SURVEYS 
Fiscal year costs were $1,188,878 of which $130,332 was 
for navigation studies, $968,860 was for flood damage 
prevention studies, $1,358 was for shoreline protection 
studies, $6,173 was for coordination with other agencies, 
$23,739 was for Special Investigations, and $58,416 was 
for Planning Assistance to States. 
31. PLANNING AND ENGINEERING 
Brazos Island Harbor, Texas (42-Foot Project) - The 
project will provide for enlargement of the entrance channel 
from deep water in the Gulf of Mexico to the Laguna 
Madre to a depth of 44 feet and a width of 400 feet; 
enlargement of the Turning Basin Extension to a point 800 
feet beyond the grain elevator to a depth of 42 feet at widths 
varying from 325 to 400 feet; removal of Brownsville 
Navigation District Wharves 5, 6, and 9 to permit widening 
of the adjacent portion of the Turning Basin to 1,200 feet 
at a depth of 36 feet; construction of asphalt walkways with 
handrails on the crown of the North and South Jetties; and 
construction of park-type public use facilities at the inner 
end of the North Jetty. Estimated planning and engineering 
estimate is $1,230,000. Planning and engineering studies 
were initiated in Fiscal Year 1987. Fiscal year costs were 
$201,963. 
Sims Bayou at Houston, Texas - The project will 
provide for enlargement and rectification, with appropriate 
erosion control measures, of 19.31 miles of Sims Bayou 
to provide flood protection, environmental measures and 
riparian habitat improvement along the entire alignment; 
and recreational development consisting of hike-and-bike 
trails connecting public parks, as well as picnic and other 
day-use facilities. Estimated planning and engineering 
estimate is $2,300,000. Planning and engineering studies 
were initiated in Fiscal Year 1986. Fiscal year costs were 
$508,887. 
Texas City Channel, Texas (50-foot Project) - The 
project will provide for enlargement of Texas City Channel 
to 50 feet deep and 600 feet wide over its 6.7 mile length 
and enlargement of Galveston Harbor Channel to 50-52 
feet deep and 800 feet wide over the 10.5 mile length. The 
Galveston Entrance Channel would be extended 12.5 miles 
to the 52-foot bottom in the Gulf of Mexico. A 50-year 
dredged material disposal plan will be provided by a 
combination of containment of dredged material on Snake 
Island, establishment of 600 acres of wetland, enlargment 
of Texas City Dike, and deposition of dredged material 
in the Gulf. Ninety acres of water-oriented recreational 
facilities on the Texas City Dike are included as a part 
of the proposed project. Estimated planning and 
engineering estimate is $2,000,000. Planning and 
engineering studies were intitiated in Fiscal Year 1986. 
Fiscal year costs were $789,006. 
Upper White Oak Bayou and Tributaries, vicinity of 
Houston, Texas - The project will provide for channel 
improvements on White Oak Bayou from Mile 10.7 to Mile 
19.9; on Cole Creek from Mile 0 to Mile 4.9; and on Vogel 
Creek from Mile 0 to Mile 4.5, for a total of 18.6 miles. 
Project also provides for flood plain zoning and regulation 
on the residual 100-year flood plains on White Oak Bayou 
from Mile 19.9 to near Mile 25.5; on Cole Creek form 
Mile 4.9 to near Mile 6.9; and on Vogel Creek from Mile 
4.5 to near Mile 6.5; and includes recreational development 
along White Oak Bayou from near Mile 14.6 to near Mile 
18.3. Estimated planning and engineering estimate is 
$3,700,000. Planning and engineering studies were initiated 
in 1982. Fiscal year costs were $441,756. 
32. COLLECTION AND STUDY OF 
BASIC DATA 
Flood plain management and technical services were 
performed at a cost of $24,977 and $96,753, respectively. 
Hydrologic studies cost $7,774. 
15-16

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 15-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost To 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 198727 
1. Aquatic Plant Control 
(Southwestern Division) 
1965 Act 
2. Brazos Island 
Harbor, TX 
3. Channel to Port 
Bolivar, TX 
4. Corpus Christi 
Ship Channel, TX 
(Regular Funds) 
(Contributed Funds) 
5. Double Bayou, TX 
6. Freeport Harbor, TX 
7. Galveston Harbor 
and Channel, TX 
8. Gulf Intracoastal Waterway 
between Apalachee Bay, FL and 
the Mexican Border 
(Galveston District) 
New Work: 
Approp. 180,000 
Cost 130,816 
New Work: 
Approp. - 
Cost - 
Maint: 
Approp. 448,100 
Cost 2,091,003 
Major Rehab: 
Approp. - 
Cost - 
New Work: 
Approp. - 
Cost - 
Maint: 
Approp. (-)3,700 
Cost 535 
New Work: 
Approp. 3,100,000 
Cost 4,943,296 
Maint: 
Approp. 5,514,200 
Cost 6,826,376 
Major Rehab: 
Approp. - 
Cost - 
New Work: 
Contrib. 1,300,000 
Cost 1,397,580 
New Work: 
Approp. - 
Cost - 
Maint: 
Approp. - 
Cost 414 
New Work: 
Approp. (-)25,000 
Cost 29,224 
Maint: 
Approp. 1,891,650 
Cost 2,061,605 
Minor Rehab: 
Approp. - 
Cost - 
New Work: 
Approp. - 
Cost - 
Maint: 
Approp. 12,061,900 
Cost 12,337,285 
Major Rehab: 
Approp. - 
Cost - 
New Work: 
Approp. 2,300,000 
Cost 2,218,220 
Maint: 
Approp. 9,878,800 
Cost 13,015,122 
Major Rehab: 
Approp. - 
261,000 350,000 410,000 2,358,1001 
209,089 423,289 218,283 2,091,0011 
- - 263,000 12,120,5022 
- - 201,963 12,059,4652 
90,000 862,876 4,324,300 40,038,6613 
85,612 807,209 4,384.707 40,038,5603 
- - - 2,170,080 
- - - 2,170,080 
- - - 133,9254 
- - - 133,9254 
40,000 8,879 57,000 1,177,9015 
260 48,946 55,992 1,176,8925 
2,980,000 5,186,000 5,186,000 63,824,3596 
3,024,206 4,433,754 5,820,870 63,407,4746 
3,242,650 3,958,900 1,500,800 84,735,5787 
3,087,727 4,158,250 1,501,507 84,733,8377 
- - - 3,576,684 
- - - 3,576,684 
250,000 200,000 900,000 4,542,088 
395,274 63,401 966,167 4,297,014 
- - - 226,558 
- - - 226,558 
115,000 
63,743 
5,752,000 
6,079,286 
- 290,100 
- 290,038 
55,000 1,400,000 
143,688 1,312,905 
790,100 1,774,100 
801,255 1,752,328 
1,412,0788 
4,412,0168 
4,412,1529 
4,315,9639 
44,013,31510 
43,988,78610 
8,935 
8,935 
- - - 29,096,39211 
- - - 29,096,392" 
2,149,920 2,151,100 256,800 76,068,72312 
2,129,284 2,168,744 252,486 76,055,33012 
- - - 7,969,329 
- - - 7,969,329 
6,920,000 1,445,000 600,000 61,853,303 la 
7,515,223 1,407,010 601,461 61,741,977 la 
9,888,525 
10,452,810 
14,157,400 
13,885,258 
11,807,8! 
12,291,3 
93 207,212,04814 
28 207,095,66614 
- 434,638 
15-17 
-

GALVESTON, TEXAS DISTRICT 
COST AND FINANCIAL STATEMENT TABLE 15-A 
See 
Section Total Cost To 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 198727 
8. (Continued) 
9. Houston Ship 
Channel, TX 
(Regular Funds) 
10. Matagorda, Ship 
Channel, TX 
(Regular Funds) 
11. Sabine-Neches 
Waterway, TX 
(Regular Funds) 
12. Texas City 
Channel, TX 
13. Trinity River and 
Tributaries, TX 
(Includes Wallisville) 
16. Corpus Christi Beach, 
TX (Restoration Project) 
(Contributed Funds) 
18. Buffalo Bayou and 
Tributaries, TX 
19. Clear Creek, TX 
Cost - - - - 434,638 
Minor Rehab: 
Approp. - - - - 835,873 
Cost - - - - 835,873 
New Work: 
Approp. - - - - 35,760,3821s 
Cost - - - - 35,760,38215 
Maint: 
Approp. 6,640,880 3,912,500 3,303,100 4,573,100 102,748,72316 
Cost 8,161,017 4,302,086 3,269,155 4,625,738 102,735,83616 
New Work: 
Approp. - - - - 18,058,77717 
Cost - - - - 18,058,77717 
Maint: 
Approp. 2,745,800 434,000 3,110,545 1,898,700 38,368,288 
Cost 3,055,463 438,273 3,056,503 1,954,301 38,362,335 
New Work: 
Approp. - - - - 56,136,81518 
Cost - - - - 56,136,81518 
Maint: 
Approp. 13,419,700 6,028,900 4,859,500 8,801,900 138,702,42019 
Cost 14,438,456 6,216,929 4,930,766 8,830,303 138,700,04919 
New Work: 
Approp. - - 287,000 800,000 14,412,47220 
Cost - - 266,519 789,006 14,380,99720 
Maint: 
Approp. 583,700 1,353,000 1,955,900 756,300 21,964,56121 
Cost 393,238 1,554,590 1,963,470 755,245 21,963,43721 
Major Rehab: 
Approp. - - - - 726,158 
Cost - - - - 726,158 
New Work: 
Approp. 640,000 70,000 196,000 96,000 29,201,67622 
Cost 564,548 312,119 182,708 49,190 29,090,47022 
Maint: 
Approp. 399,500 444,000 1,930,800 856,800 10,633,40323 
Cost 430,108 358,725 2,001,202 811,757 10,568,43323 
New Work: 
Approp. 595,000 0 (-)120,000 - 2,030,641 
Cost 53,377 123,491 264,506 9,337 2,005,746 
New Work: 
Approp. 50,000 475,000 (-)60,000 - 2,038,345 
Cost 53,377 111,499 280,045 9,444 2,009,401 
New Work: 
Approp. - - - - 57,206,32424 
Cost - - - - 57,206,32424 
Recreation: 
Approp. - - - - 377,804 
Cost 2,953 167,072 98,400 86,703 370,536 
Maint: 
Approp. 1,924,600 1,038,000 1,452,700 1,166,600 18,405,413 
Cost 1,966,162 1,358,579 1,442,566 1,196,542 18,369,462 
Major Rehab: 
Approp. - - - - 12,475,000 
Cost 127 - - - 12,475,000 
Dam Safety: 
Approp. - - 1,471,000 5,210,000 6,681,000 
Cost - - 623,544 2,902,172 3,525,716 
New Work: 
Approp. 152,000 21,157 350,000 579,000 3,780,361 
Cost 226,687 58,330 331,139 572,718 3,731,519 
15-18

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 15-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost To 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 198727 
19. (Contributed Funds) New Work: 
(Continued) Approp. - - - 300,000 300,000 
Cost - - - 200,000 200,000 
21. Port Arthur and Vicinity, TX New Work: 
Hurricane-Flood Protection Approp. (-)276,000 - - - 59,702,509 
(Regular Funds) Cost 151,068 10,902 (-)2,599 26 59,682,066 
(Contributed Funds) New Work: 
Contrib. - - - - 16,291,97525 
Cost 64,957 2,293 1,517 - 16,237,64425 
22. Sims Bayou, TX New Work: 
Approp. - - 383,000 552,000 935,000 
Cost - - 300,776 508,887 809,663 
23. Taylors Bayou, TX New Work: 
(Regular Funds) Approp. 2,650,000 3,550,000 3,594,000 4,700,000 19,237,198 
� Cost 1,943,612 3,933,121 3,749,224 4,767,108 19,027,288 
(Contributed Funds) New Work: 
Contrib. 500,000 1,099,000 1,200,000 1,500,000 5,299,000 
Cost 425,850 1,284,523 1,138,507 1,745,394 5,264,640 
24. Texas City and Vicinity, TX New Work: 
Hurricane-Flood Protection Approp. - 122,000 300,000 - 37,982,400 
(Regular Funds) Cost 1,558,750 941,301 639,007 138,296 37,948,600 
(Contributed Funds) New Work: 
Contrib. 900,000 200,000 175,000 15,000 14,225,10026 
Cost 669,567 446,234 354,683 137,455 14,219,27426 
25. Upper White New Work: 
Oak Bayou, TX Approp. - - 253,000 539,000 792,000 
Cost - - 237,984 441,756 679,740 
26. Vince and Little Vince New Work: 
Bayous, TX Approp. 1,300,000 2,340,000 3,145,000 2,800,000 17,953,100 
Cost 2,499,132 1,953,848 3,203,495 2,464,974 17,229,627 
' Excludes $473,800 credit for contributed work. 
2 Includes $675,855 for previous projects. In addition, $1,806,619 
expended from contributed funds, of which $123,361 was for 
previous projects. 
3 In addition, $14,692 expended from contributed funds. 
4 Includes $48,711 for previous projects. 
s Includes $46,101 for previous projects. 
6 Includes $1,372,534 for previous projects. Includes $456,515 
for Sec. 107 project for Port Aransas Breakwaters. In addition $768 
expended from contributed funds for Port Aransas Breakwaters. 
7 Includes $62,452 for previous projects. In addition, $445,269 
expended from contributed funds. 
8 In addition $102,325 expended from contributed funds. 
9 Includes $147,098 for previous projects. In addition, $1,143,203 
expended from contributed funds. ($384,900 on 45' project.) 
10 In addition, $229,311 expended from contributed funds. 
" Includes $8,421,996 for previous projects. In addition, 
$3,648,932 expended from contributed funds. 
12 Includes $86,126 for previous projects. In addition, $2,099,360 
expended from contributed funds. 
13 Includes $706,709 for previous projects. Includes Sec. 107 
projects for Port Isabel Small Boat Basin ($46,559); Port Isabel 
Side Channel ($8,414); Offatts Bayou ($356,466); and Channel to 
Aransas Pass ($658,573). In addition contributed funds expended 
for Port Isabel Small Boat Basin ($46,559); Offatts Bayou ($49,665); 
Channel to Aransas Pass ($347,950); Chocolate Bayou ($658,310); 
and Mouth of Colorado River ($2,454,949). 
14 Includes $1,526,564 for previous projects. In addition, $22,672 
expended from contributed funds. 
's Includes $4,105,157 for previous projects. In addition, 
$2,591,939 expended from contributed funds, of which $1,209,179 
was for previous projects. 
16 Includes $1,213,142 for previous projects. In addition, 
$512,969 expended from contributed funds, of which $200,000 was 
for previous projects. 
17 In addition, $12,259,619 expended from contributed funds and 
$182,800 for contributed lands. 
18 Includes $5,180,832 for previous projects. In addition, 
$2,680,942 expended from contributed funds, of which $577,507 
was for previous projects. 
19 Includes $2,379,677 for previous projects. In addition, 
$2,868,071 expended from contributed funds. 
20 Includes $366,823 for previous projects. In addition, 
$1,023,819 expended from contributed funds, of which $99,000 was 
for mitigation measures. 
21 Includes $195,083 for previous projects. 
22 Includes $1,966,306 for previous projects. in addition, $66,000 
expended from contributed funds. 
23 Includes $543,662 for previous projects. 
24 Includes $4,400,000 of advanced funds repaid to Harris 
County Flood Control District. In addition, $63,661 contributed 
funds expended for Brays Bayou and $12,900 Federal funds and 
$19,104 contributed funds expended for enlargement of Clodine 
Ditch. 
25 Excludes $3,402,588 estimated value of contributed lands, 
$6,168,360 for relocations, and $217,000 credit given local sponsor 
for work-in-kind. 
26 Excludes $1,349,069 estimated value of contributed lands and 
$1,070,959 credit given local sponsor for work-in-kind. 
27 Includes funds ($12,544,400) provided by the Jobs Act (P.L. 
98-8, dated March 24, 1983) for projects listed in Table 15-I of 
Annual Report for 1985. 
15-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 15-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in ITet Act Project and Work Authorized Documents 
AQUATIC PLANT CONTROL 
1. Oct. .27, 1965 Provides for control of progressive eradication of aquatic plant growth 
from the navigable waters and streams in the U.S. 
Nov. 17, 1986 Amended cost sharing requirements to provide for 50 percent Federal 
and 50 percent non-Federal participation in control operations. 
2. Jun 3, 1930 
May 24, 1934 
(PWA) 
Aug. 30, 1935 
Aug. 26, 1937 
Mar. 2, 1945 
BRAZOS ISLAND HARBOR, TX 
Jetties and jetty channel, inside channels and basins. 
Local cooperation requirement modified to provide contribution of funds 
to cover cost of original dredging of all inside channels and basins. 
Deepen jetty channel to 31 feet and inner channels and Brownsville 
and Port Isabel turning basins to 28 feet. 
Enlarge Port Isabel turning basin. 
Mar. 2, 1945 Deepen entrance channel to 35 feet; deepen to 33 feet channel across 
Laguna Madre; deepen to 32 feet channels from Laguna Madre to 
turning basins at Brownsville and Port Isabel; widen turning basins; 
and dredging present shallow-draft channel south of Port Isabel from 
railroad bridge to Laguna Madre and connecting channel to Port Isabel 
turning basin. 
Jul. 24, 1946 Additional connecting channel between Port Isabel and Brownsville 
channels; and transfer shallow-draft channels at Port Isabel to GIWW. 
May 17, 1950 Deepen to 38 feet in outer bar channels and 36 feet in all other authorized 
channels and basins; extend existing turning basins at Brownsville and 
Port Isabel; and construct small-boat basin with a connecting channel 
next to Brownsville ship channel. 
Jul. 14, 1960 
Nov. 17, 1986 
Widen Brownsville Channel to 300 feet at a depth of 36 feet from former 
Goose Island passing basin to turning basin extension, thence at a width 
of 500 feet and same depth to turning basin proper, deepen to 36 feet 
in area in southeast corner of turning basin, maintain two existing basins 
of fishing harbor, and a connecting channel, and construct a third basin, 
with necessary connecting channel and extend Brazos Island Harbor 
north jetty seaward 1,000 feet. 27 
Enlargement of the entrance channel from deep water in the Gulf of 
Mexico to the Laguna Madre to a depth of 44 feet and a width of 400 
feet; enlargement of the Turning Basin Extension to a point 800 feet 
beyond the grain elevator to a depth of 42 feet at widths varying from 
325 to 400 feet; removal of Brownsville Navigation District Wharves 
5, 6, and 9 to permit widening of the adjacent portion of the Turning 
Basin to 1,200 feet at a depth of 36 feet; construction of asphalt walkways 
with handrails on the crown of the North and South Jetties, and 
construction of park-type public use facilities at the inner end of the 
North Jetty. 
CHANNEL TO PORT BOLIVAR, TX 
H.Doc. 251,89th Cong., 
1st Sess. 
Sec. 103(c), PL 99-662 
Rivers and Harbors 
Committee Doc. 16, 
71st Cong., 2nd Sess. 
Rivers and Harbors 
Committee Doc. 10, 
71st Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 32 
75th Cong., 1st Sess. 
H.Doc. 335, 76th Cong., 
1st Sess. 
H.Doc. 347, 77th Cong., 
1st Sess. 
H.Doc. 627, 79th Cong., 
2nd Sess. 
H.Doc. 192, 81st Cong., 
1st Sess. 
H.Doc. 428, 86th Cong., 
2nd Sess.' 
Sec. 201, PL 99-662 
3. Jun. 25, 1910 A channel 30 feet deep and 200 feet wide from deep water in Galveston H. Doc. 328, 61st Cong., 
Harbor extending to a turning basin 1,000 feet square and 30 feet deep.31 2nd Sess. 
Mar. 4, 1919 Enlargement, extension and protection of turning basin.31 
CORPUS CHRISTI SHIP CHANNEL, TX 
4. Mar. 3, 1899 Acquisition of old curvey portion of north jetty previously constructed 
by private parties. 
Jun. 13, 1902 Complete north jetty in accordance with builder's plans. 
H. Doc. 1122, 65th Cong., 
2nd Sess. 1 
Specified in Act. 
Specified in Act. 
15-20

GALVESTON, TEXAS DISTRICT 
AUTHORIZING LEGISLATION TABLE 15-B 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Mar. 3, 1905 
Mar. 2, 1907 
Complete north jetty in accordance with builder's plans. 
Connect old curve to St. Joseph Island, and construct south jetty. 
Feb. 27, 1911 Dredge roadstead in Harbor Island Basin to 20 feet deep and construct 
10,000 linear feet of stone dike on St. Joseph Island. 
Mar. 4,19132 Channel between jetties and Harbor Island Basin to 25 feet deep, extend 
jetties seaward, extend dike on St. Joseph Island 9,100 feet, and dredge 
approach channel 12 feet deep to town of Port Aransas. 
Sep. 23, 1922 Dredging channel from Aransas Pass to Corpus Christi, 25 feet deep, 
200 feet bottom width. 
Jul. 3, 19303 Deepen entrance channel from gulf to Harbor Island and provide an 
inner basin at Harbor Island of reduced area but greater depth. 
Jul. 3, 1930 Channel from Aransas Pass to Corpus Christi Channel with depth 30 
feet. 
Aug. 30, 19354 
Aug. 30, 1935 
Aug. 30, 1935 
Enlarge all channels from gulf to western end of basin dredged by 
Humble Oil and Refining Co., at its docks on Harbor Island. 
Maintain channel and maneuvering basin between breakwater and 
western shoreline of Corpus Christi Bay. 
Maintain 30-foot depth of approach channel, turning basin at Corpus 
Christi, Industrial Canal and turning basin at Avery Point. 
Aug. 30, 1935 Maintain and deepen to 32 feet channel from deep water at Port Aransas 
to and including turning basin at Corpus Christi. 
Jun. 20, 1938 Extend main turning basin at Corpus Christi westward 2,500 feet at 
its present width and depth, deepen existing Industrial Canal and turning 
basin to 32 feet and extend this canal at a depth of 32 feet and general 
width of 150 feet, westward along Nueces Bay shore to a turning basin 
32 feet by 900 feet, and 1,000 feet long near Tile Lake. 
Mar. 2, 1945 Provide depth of 34 feet in all project channels and basins from Port 
Aransas to and including Tle Lake turning basin, for a width of 250 
feet from Port Aransas to breakwater at Corpus Christi, for a width 
of 200 feet in Industrial Canal and in channel between Avery Point and 
Tule Lake turning basins, and widen Avery Point turning basin to 1,000 
feet. 
Jun. 30, 1948 Deepen entrance channel to 38 feet from gulf to outer end of jetty; 
38 feet decreasing to 36 feet thence to station 90 north jetty; and 36 
feet in all other deep water channels and basins except 2,000-foot 
undredged part of inner basin at Harbor Island, and a width of 400 
feet in channel from Port Aransas to Maneuvering basin at Corpus 
Christi. 
Sep. 3, 1954 An anchorage basin 12 feet deep, from 300 to 400 feet wide, and 900 
feet long in TuIbrtle Cove at Port Aransas, Texas. 
Sep. 3, 1954s Branch channel 32 feet by 150 feet, extending northerly from main 
channel in vicinity of Port Ingleside, along north shore of Corpus Christi 
Bay to Reynolds Metals Co. plant and turning basin 32 feet deep and 
800 feet square near plant in general vicinity of LaQuinta, Texas. 
Sep. 3, 1954 An entrance channel 36 by 400 feet on a tangent alignment from 400-foot 
channel in Corpus Christi Bay, near Corpus Christi breakwater to flared 
approach channel to Corpus Christi turning basin. 
Jul. 3, 1958 Deepen and widen LaQuinta Channel to 36 by 200 feet; enlarge 
LaQuinta turning basin to 36 by 800 by 1,000 feet; a flared entrance 
to channel; and widening at curves. 
Specified in Act. 
Rivers and Harbors 
Committee Doc. 5, 
59th Cong., 2nd Sess. 
H. Doc. 1094, 61st Cong., 
3rd Sess. 
H. Doc. 1125, 62nd Cong., 
3rd Sess. 
H. Doc. 321, 67th Cong., 
2nd Sess. 
H. Doc. 214, 70th Cong., 
1st Sess. 
Rivers and Harbors 
Committee Doc. 9, 
71st Cong., 1st Sess. 
Committee Does. 35, 
72nd Cong., 1st Sess., 
and 40, 73rd Cong., 
2nd Sess. 
H. Doc. 130, 72nd Cong., 
1st Sess. 
Rivers and Harbors 
Committee Does. 13 
74th Cong., 1st Sess. 
Rivers and Harbors 
Committee Does. 63 
74th Cong., 1st Sess. 
H. Doc. 574, 75th Congr., 
3rd Sess. 
H. Doc. 544, 78th Congr., 
2nd Sess. 
H. Doc. 560, 80th Congr., 
2nd Sess. 
H. Doc. 654, 81st Congr., 
1st Sess. 
H. Doc. 89, 83rd Congr., 
1st Sess. 
H. Doc. 487, 83rd Congr., 
2nd Sess. 
S. Doc. 33, 85th Congr., 
1st Sess. 
15-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 15-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Jul. 3, 1958 Deepen entrance channel to 42 feet from gult to outer end of jetty; 40 
feet in all other deep-water channels and basins except undredged 
northward extension to inner basin at Harbor Island and branch channel 
to LaQuinta; and widen Industrial Chanal to 400 feet with flared 
entrances to Corpus Christi and Avery Point turning basins. 
Jul. 3, 1958 Channel 40 by 200 feet extending 2.2 miles from Tule Lake turning 
basin to a turning basin 40 feet deep, 700 to 900 feet wide, 1,000 feet 
long at Viola, Texas. 
Jul. 3, 1958 Depth of 12 feet and a width of 100 feet in locally dredged Jewel Fulton 
Canal from LaQuinta Channel to a turning basin 12 by 200 by 400 feet, 
and assumption of maintenance by United States. 
Jul. 14, 1960 
(As amended by 
Dec. 31, 1970) 
Construction of a breakwater at entrance to harbor area at Port Aransas, 
and realignment of existing 12-foot by 100-foot project channel. 
Aug. 13, 1968 Provides for a project depth of 45 feet in the existing deep-draft channels 
and basins, for construction of a new deep-draft turning point, for 
construction of a deep draft mooring area and mooring facilities and 
for widening of the channels and basins at certain locations. The Act 
also deauthorized the undredged northward extension of Inner Basin 
at Harbor Island and the undredged west turnout (Wye connection) 
between the LaQuinta Channel and the main channel of the waterway. 
Oct. 22, 1976 Modified local cooperation requirements for 1968 Act. Shifted 
responsibility for cost of disposal areas and confinement works from 
sponsor to joint 75 percent Federal and 25 percent non-Federal 
responsibility 
DOUBLE BAYOU, TX 
H. Doc. 361, 85th Congr., 
2nd Sess. 
H. Doc. 361, 85th Congr., 
2nd Sess. 
H. Doc. 361, 85th Congr., 
2nd Sess. 
Sec. 107, PL 86-645 
S. Doc. 99, 90th Cong., 
2nd Sess.1 
Sec. 124, PL 94-587 
5. Mar. 3, 1899 
Jul. 14, 1960 
(As amended 
Oct. 25, 1965) 
6. Mar. 3, 1899 
Mar. 2, 1907 
Feb. 27, 1911 
Mar. 4, 1913 
Aug. 8, 1917 
Mar. 3, 19256 
A channel 6-feet deep and 100-feet wide through the bar at mouth of 
Double Bayou. 
7-foot by 125-foot channel from the 7-foot depth in Trinity Bay to the 
intersection of Double Bayou Channel with the channel to Liberty; and 
thence a 7- by 100-foot channel upstream for 2.0 miles. 
FREEPORT HARBOR, TX 
Dredging and other work necessary in judgment of Secretary of War 
for improving harbor; for taking over jetties and privately built works 
at mouth of river. 
Examination authorized. Work later confied to maintenance of jetties. 
Repairs to jetties and dredging. 
Construct seagoing hopper dredge. 
Purchase of one 15-inch pipeline dredge and equipment, its operation 
of 3 years, operation of seagoing dredge one-halftime for 3 years, and 
repairs to jetties. 
Diversion dam, diversion channel, and necessary auxiliary works. 
Jul. 3, 1930 Maintenance of diversion channel at expense of local interest. 
Aug. 30, 19357 
Aug. 30, 1935 
Deepening channels and basins. 
Maintenance of present project dimensions of channels and basins at 
Federal expense. 
H. Doc. 387, 55th Cong., 
2nd Sess. 
Sec. 107, PL 86-645 
Specified in Act. 
H. Doc. 1087, 60th Cong., 
2nd Sess. 
Specified in Act. 
Specified in Act. 
Specified in Act. 
Rivers and Harbors 
Committee Doc. 10, 
68th Cong., 2nd Sess. 
Rivers and Harbors 
Committee Doc. 18, 
70th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 15, 
72nd Cong., 1st Sess. 
Rivers and Harbors 
Committee Docs. 15, 
72nd Cong., 1st Sess., 
and 29, 73rd Cong., 
2nd Sess. 
15-22

GALVESTON, TEXAS DISTRICT 
AUTHORIZING LEGISLATION TABLE 15-B 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
May 17, 1950 Deepen outer bar channel to 38 feet from gulf to a point within jetties, 
thence 36 feet in authorized channels to and including upper turning 
basin. 
Jul. 3, 1958 Relocate outer bar channel on straight alignment with jetty channel and 
maintain Brazos Harbor entrance channel and turning basin (constructed 
by local interests). 
Oct. 5, 1961 Modification of HD 1469. Revoking certain provisions of local 
cooperation. 
Dec. 31, 1970 Relocation of entrance channel and deepen to 47 feet; enlargement to 
a depth of 45 feet and relocation of jetty channel and inside main 
channel; deepening to 45 feet of channel to Brazosport; enlargement 
of the widened area of Quintana Point to provide a depth of 45 feet 
with a 750-foot diameter turning area; Brazosport turning basin to 45 
feet deep with a 1,000 foot turning area; a new turning basin with a 
1,200 foot diameter turning area and 45 feet deep; deepening Brazosport 
channel to 36 by 750 feet diameter; flared approaches from Brazos 
Harbor Channel; relocation of north jetty and rehabilitation of south 
jetty. 
Nov. 17, 1986 Modified local cooperation requirements for the 1970 Act. 
7. Aug. 5, 1886 
GALVESTON HARBOR AND CHANNEL, TX 
Construct 2 rubblestone jetties at entrance to Galveston Harbor. 
Jun. 13, 1902 A channel 1,200 by 30 feet from Bolivar Roads (outer end of old inner 
bar near Fort Point) at 51st Street.8 
Mar. 3, 1905 Purchase or construct hydraulic pipeline dredge. 
Mar. 2, 1907 Extension of jetties to present project length and construction and 
operation of a dredge. 
Mar. 2, 1907 
Jun. 25, 19109 
Jul. 27, 1916 
Jul. 18, 1918 
Extension of Galveston Channel from 51st to 57th Sts., with depth of 
30 feet and width of 700 feet. 
Conditional extension of Galveston Channel between 51st and 57th Sts., 
30 feet deep and 1,000 feet wide. 
Extend seawall at Galveston from angle at 6th St. and Broadway to 
vicinity of Fort San Jacinto. 
Deepen harbor channel to 35 feet and widen to 800 feet. 
Sep. 22, 1922 Further extension of seawall at Galveston to a junction with south jetty; 
and repairing seawall in front of Fort Crockett reservation. 
Jan. 21, 1927 Deepen Galveston Channel to 32 feet; and maintain Galveston Harbor 
channels to dimensions of 800 feet wide, 35 feet deep on outer bar 
and 34 feet deep in inner bar.10 
Aug. 30, 1935"11 Maintain State Highway Ferry Landing Channels to dimensions of 12 
by 100 feet. 
Aug. 30, 1935 Construct 13 groins along gulf shore from 12th to 61st Sts. in city of 
Galveston at a limited cost of $234,000 (10 groins constructed). 
Aug. 30, 1935 Deepen Galveston Channel to 34 feet (Bolivar Roads to 43rd St.). 
Aug. 30, 1935 Deepen Galveston entrance channel to 36 feet. 
Apr. 4, 1938 Completion of project for construction of 13 groins. 
H. Doc. 195, 81st Cong., 
1st Sess. 
H. Doc. 433, 84th Cong., 
2nd Sess. 
PL 394, 87th Cong. 
H. Doc. 289, 93rd Cong., 
2nd Sess.2 
Sec. 101, PL 99-662 
H. Doc. 85, 49th Cong., 
1st Sess., and Annual 
Report, 1886, p. 1311. 
H. Doc. 264, 56th Cong., 
2nd Sess. 
Specified in Act. 
H. Doc. 340, 59th Cong., 
2nd Sess., and 
Rivers and Harbors 
Committee Doc. 11, 
59th Cong., 2nd Sess. 
H. Doc. 768, 59th Cong., 
2nd Sess. 
H. Doc. 328, 61st Cong., 
2nd Sess. 
H. Doc. 1390, 62nd 
Cong., 3rd Sess. 
H. Doc. 758, 65th Cong., 
2nd Sess. 
H. Doc. 693, 66th Cong., 
2nd Sess. 
H. Doc. 307, 69th Cong., 
1st Sess. 
River and Harbors 
Committee Doc. 31, 
72nd Cong., 1st Sess. 
H. Doc. 400, 73rd Cong., 
2nd Sess. 
Rivers and Harbors 
Committee Doc. 61, 
74th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 57, 
74th Cong., 1st Sess. 
PL 463, 75th Cong. 
15-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 15-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Jun. 30, 1948 Deepen Glaveston Harbor to 38 feet from gulf to a point 2 miles west 
of seaward end of north jetty; thence 36 feet to Bolivar Roads; revoking 
authority for maintenance of ferry channels; and Galveston channel to 
36 feet deep from Bolivar Roads to 43rd Street. 
May 17, 1950 Construct extension of Galveston Seawall from 61st Street, southwesterly 
16,300 feet along gulf shore. 
Jul. 3, 1958 Deepen Galveston Harbor to 42 feet from gulf to point 2 miles west 
of seaward end of north jetty and 40 feet thence to Bolivar Roads. 
Jun. 23, 1971 Deepen Galveston Channel to 40 feet from Bolivar Roads to 43rd Street. 
(House Res.) 
Nov. 18, 1971 
(Senate Res.) 
GULF INTRACOASTAL WATERWAY BETWEEN 
APALACHEE BAY, FL AND MEXICAN BORDER 12 
8. Mar. 2, 1907 Channel 4 by 100 feet from West Galveston Bay across Chocolate Bay 
to 4 feet of water in Chocolate Bay. 
Mar. 3, 1925 Channel 9 by 100 feet, Sabine River to Galveston Bay, and a 20-inch 
pipeline dredge. Such passing places, widening at bends, locks or guard 
locks and railway bridges over artificial cuts as are necessary. 
Jan. 21, 1927 Channel 9 by 100 feet, Galveston Bay to Corpus Christi. 
Aug. 26, 1937 Maintenance of a flood-discharge channel in Colorado River. 
Jun. 20, 193813 Channel 9 by 100 feet in San Bernard River, Texas. 
Jun. 20, 1938 Channel in Colorado River, 9 by 100 feet, with basin. 
Jun. 20, 1938 Channel 9 by 100 feet from Palacios through Trepalacios and Matagorda 
Bays. 
Jun. 20, 1938 Channel 9 by 200 feet from main channel to harbor at Rockport and 
improve harbor to 9-foot depth. 
Jun. 20, 1938 Channel 6 by 100 feet from main channel to Aransas Pass, Texas. 
Mar. 23, 1939 
Jul. 23, 1942 
Mar. 2, 1945 
Mar. 2, 19459 
Mar. 2, 1945 
Mar. 2, 1945 
Mar. 2, 194514 
Enlarge waterway to depth of 12 feet and a width of 125 feet from Sabine 
River to Corpus Christi. 
Enlarge waterway from Corpus Christi to vicinity ofMexican border 
to provide a depth of 12 feet and width of 125 feet throughout. 
Channel 6 by 60 feet from GIWW to a point in Chocolate Bayou near 
Liverpool. 
Channel 6 feet deep and 60 feet wide from main channel near Port 
O'Connor, Texas, in Barroom Bay. 
Enlarge channel from main channel to Aransas Pass, Texas, providing 
a depth of 9 feet and width of 100 feet. 
Channel 12 by 125 feet from main channel to Red Fish Landing, Texas, 
with basin. 
Channel 12 feet deep and 125 feet wide from main channel to vicinity 
of Harlingen, Texas, via Arroyo Colorado with basin. 
Jul. 24, 1946 Fill a portion of shallow-draft channel adjacent to Port Isabel Turning 
Basin, construct a channel to connect shallow-draft channel with main 
channel near shoreline of Laguna Madre, and enlarge shallow-draft 
channel west of this connection, all to 12-foot depth and bottom width 
of 125 feet. 
Jul. 24, 1946 Reroute main channel to north shore of Red Fish Bay between Aransas 
Bay and Corpus Christi Bay; deepen tributary channel from Port Aransas 
H. Doc. 561, 80th Cong., 
2nd Sess. 
H. Doc. 173, 81st Cong., 
1st Sess. 
H. Doc. 350, 85th Cong., 
2nd Sess. 
H. Doc. 121, 92nd Cong., 
1st Sess. 
(Sec. 201, PL 89-298) 
H. Doc. 445, 56th Cong., 
1st Sess. 
H. Doc. 238, 68th Cong., 
1st Sess. 
H. Doc. 238, 68th Cong., 
1st Sess. 
S. Committee print, 
75th Cong., 1st Sess. 
H. Doc. 640, 75th Cong., 
3rd Sess. 
H. Doc. 642, 75th Cong., 
3rd Sess. 
H. Doc. 564, 75th Cong., 
3rd Sess. 
H. Doc. 641, 75th Cong., 
3rd Sess. 
H. Doc. 643, 75th Cong., 
3rd Sess. 
H. Doc. 230, 76th Cong., 
1st Sess. 
PL 675, 77th Cong. 
H. Doc. 337, 76th Cong., 
1st Sess. 
H. Doc. 428, 76th Cong., 
1st Sess. 
H. Doc. 383, 77th Cong., 
1st Sess. 
S. Doc. 248, 78th Cong., 
2nd Sess. 
H. Doc. 402, 77th Cong., 
1st Sess. 
(See PL 14, 79th Cong.) 
H. Doc. 627, 79th Cong., 
2nd Sess. 
H. Doc. 700, 79th Cong., 
2nd Sess. 
15-24

GALVESTON, TEXAS DISTRICT 
AUTHORIZING LEGISLATION TABLE 15-B 
See Date 
Section Authorizing 
in Text .Act Project and Work Authorized Documents 
to Aransas Pass, Texas, 12 feet and extended basin at same depth. 
Deauthorized 6 by 60 foot channel in Chocolate Bayou and reauthorized 
the 4 by 100-foot channel. 
May 17, 1950 Alternate channel across South Galveston Bay between Port Bolivar 
and Galveston causeway. 
May 17, 1950 "Red Fish Landing" changed to "Port Mansfield, Texas." 
Jul. 12, 1952 Incorporate as part of Intracoastal Waterway a channel 9 by 100 feet 
from main channel via Seadrift to point on Guadalupe River 3 miles 
above Victoria, Texas, authorized by River and Harbor Act of 1945. 
Sep. 3, 195415 Small craft harbor 9 by 200 by 1,000 feet at Seadrift with an entrance 
channel 9 by 100 feet. 
Sep. 3, 1954 Widen tributary channel between Port Aransas and Aransas Pass, Texas, 
to 125 feet; straighten and widen to 125 feet connecting channel to Conn 
Brown Harbor, and maintain Conn Brown Harbor at Federal expense, 
all to 12 feet deep. 
Sep. 9, 1959 Improve channels and basins comprising channel to Port Mansfield 
constructed in part by Federal Government and in part by local interest; 
constructing turnout curves at Gulf Intracoastal Waterway intersection 
and bend easing at entrance to turning basin; construct parallel jetties 
at gulf entrance; maintenance of locally dredged jetty channel 16 by 
250 feet; and maintenance of small craft basin. 
Jul. 14, 1960 Entrance channel 7 feet deep by 75 feet wide from main channel to 
Gulf of Mexico to inside shoreline at Port Isabel, Texas, an inner channel 
6 feet deep by 50 feet wide from entrance channel to East Harbor Basin, 
and an irregular-shaped harbor basin 6 feet deep having a surface area 
of about 7 acres. 
Jul. 14, 1960 Deepen the existing 6-foot channel at Port Isabel to 12 feet and removing 
(As amended the submerged bars at each end of the island to a depth of -12 feet MLT. 
Dec. 31, 1970) 
Jul. 14, 1960 
(As amended 
Dec. 31, 1970) 
Deepening the existing channel to 12 by 125 feet, and extend 
southeasterly from the Gulf Intracoastal Waterway main channel in West 
Galveston Bay, into Offatts Bayou, a distance of 2.2 miles, and a west 
turnout 12 by 125 feet between the proposed Offatts Bayou Channel 
and the Gulf Intracoastal Waterway. 
Jul. 14, 1960 Deepening Aransas Pass tributary channel to 14 feet from mile 0 at 
(As amended Harbor Island to mile 6.1 at the city of Aransas Pass; widening to 175 
Dec. 31, 1970( feet between miles 3.5 and 4.6; and deepening Conn Brown Harbor, 
turning basin and connecting channel between Conn Brown Harbor and 
turning basin. 
Oct. 23, 196216 Improve main channel 16 feet deep and 150 feet wide from Sabine River 
to Houston Ship Channel; with two relocations; relocate main channel 
in Matagorda Bay and Corpus Christi Bay; and maintaining existing 
Lydia Ann Channel. 
Oct. 23, 1962 Deepen and widen channel to Palacios; construct two protective 
breakwaters; maintain and deepen existing basins; and deepen, enlarge 
and maintain existing approach channel to basin No. 2. 
Oct. 23, 1962 Eliminates requirement of local interest to construct bridge at mile 29.2 
turning basin at Victoria, and maintain turning basins at Victoria and 
Seadrift; provide: Federal construction of vertical-lift railroad bridge 
at Missouri-Pacific Railroad mainline crossing, mile 29.2; construction 
and future maintenance of basin near Victoria, Texas, and maintenance 
of basin constructed by local interests at Seadrift, Texas. 
Oct. 27, 196517 Modify existing Federal navigation project to provide a channel 
extending from Gulf Intracoastal Waterway through Chocolate Bay and 
Chocolate Bayou to project channel mile 8.2, thence to a turning basin 
near channel mile 13.2 and for salt water barrier in Chocolate Bayou 
about 3.7 miles upstream from basin (channel mile 16.9). 
Continued from 
previous page 
May 17, 1950 
15-25 
H. Doc. 768, 80th Cong., 
2nd Sess. 
H. Doc. 196, 81st Cong., 
1st Sess. 
PL 516, 81st Cong. 
PL 527, 82nd Cong. 
2nd Sess. 
H. Doc. 478, 81st Cong., 
2nd Sess. 
H. Doc. 376, 83rd Cong., 
2nd Sess. 
S. Doc. 11, 86th Cong., 
1st Sess. 
Sec. 107, PL 645, 
86th Cong. 
Sec. 107, PL 86-645 
Sec. 107, PL 86-645 
Sec. 107, PL 86-645 
H. Doc. 556, 87th Cong., 
2nd Sess. 
H. Doc. 504, 87th Cong., 
2nd Sess. 
H. Doc. 288, 87th Cong., 
2nd Sess. 
H. Doc. 217, 89th Cong., 
1st Sess.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 15-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Aug. 13, 1968 Entrance channel 15 feet deep and 200 feet wide at the mouth of 
Colorado River Channel protected by an east jetty 3,500 feet long 
extending to 12-foot depth and a west jetty 2,900 feet long extending 
to 5-foot contour; make channel 12 feet by 100 feet from gulf shore 
to Matagorda, including recreation facility, a turning basin 12 feet by 
300 feet wide and 1,450 feet long, and a new diversion channel 250 
feet wide and varying in depth from 20 to 23 feet including a closure 
dam across the present river channel 
Nov. 17, 1986 Modified 1968 authorization to provide that diversion features be 
constructed at Federal expense and operation and maintenance be shared 
75 percent Federal and 25 percent non-Federal. 
HOUSTON SHIP CHANNEL, TX 
9. Mar. 5, 1905 Easing or cutting off sharp bends and construction of a pile dike.' 8 
Mar. 2, 1919 A channel 30 feet deep, widen bend at Manchester and enlarge turning 
basin. 
Mar. 3, 1925 A light-draft extension of channel to mouth of White Oak Bayou.19 
Jul. 3, 1930 Widen channel through Morgan Point and to a point 4,000 feet above 
Baytown and widen certain bends. 
Aug. 30, 193511 
Aug. 30, 1935 
Mar. 2, 1945 
Deepen to 32 feet in main channel and turning basin, and a 400-foot 
width through Galveston Bay. 
Deepen to 34 feet in main channel and widen from Morgan Point to 
turning basin. 
Branch channel 10 by 60 feet behind Brady Island. 
Mar. 2, 1945 Widen channel from Morgan Point to lower end of Fidelity Island with 
turning points at mouth of Hunting Bayou and lower end of Brady Island. 
Mar. 2, 1945 Widen channel from lower end of Fidelity Island to Houston turning 
basin and dredge off-channel silting basins. 
Jun. 30, 1948 Deepen to 36 feet from Bolivar Roads to and including main turning 
basin at Houston, Texas, including turning points at Hunting Bayou and 
Brady Island. 
Jul. 3, 195820 
Jul. 14, 1960 
Deepen to 40 feet from Bolivar Roads to Brady Island, construct Clinton 
Island turning basin, a channel 8 by 125 feet at Five Mile Cut, and 
improve shallow-draft channel at Tbrkey Bend. 
Barbour Terminal at Morgan Point. 
Oct. 27, 1965 Restoring existing locally dredged channel from mile 0 to 0.34 to 36 
feet deep and dredging a 15-12 ft. channel from mile 0.34 to 2.81, in 
Greens Bayou. 2 1 
Nov. 17, 1986 Maintenance of Greens Bayou, Barbour Terminal Channel, and Bayport 
Ship Channel to forty-foot depths at Federal expense. 
MATAGORDA SHIP CHANNEL, TX 
10. Jun. 25, 1910 Channel to Port Lavaca, Texas 7 feet deep and 89 feet bottom width. 
Aug. 30, 1935 Extend 7-foot channel to shoreline of Lavaca Bay at mouth of Lynns 
Bayou. 
Aug. 26, 1937 Deepen and widen channel to present project dimensions. 
S. Doc. 102, 90th Cong., 
2nd Sess. 
Sec. 812, PL 99-662 
Rivers and Harbors 
Committee Doc. 35, 
61st Cong., 2nd Sess. 
H. Doc. 1632, 65th Cong., 
3rd Sess. 
H. Doc. 93, 67th Cong., 
1st Sess. 
H. Doc. 13, 71st Cong., 
1st Sess. 
Rivers and Harbors 
Committee Doc. 28, 
72nd Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 58, 
74th Cong., 1st Sess. 
H. Doc. 226, 76th Cong., 
1st Sess. 
H. Doc. 226, 76th Cong., 
1st Sess. 
H. Doc. 737, 79th Cong., 
2nd Sess. 
H. Doc. 561, 80th Cong., 
2nd Sess. 
H. Doc. 350, 85th Cong., 
2nd Sess.' 
Sec. 107, PL 86-645 
R. Doc. 257, 89th Cong., 
1st Sess. 
Sec. 819, PL 99-662 
H. Doc. 1082, 60th Cong., 
2nd Sess. 
Rivers and Harbors 
Committee Doc. 28, 
74th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 37, 
75th Cong., 1st Sess. 
15-26

GALVESTON, TEXAS DISTRICT 
AUTHORIZING LEGISLATION TABLE 15-B 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Extend channel 6 by 100 feet from Port Lavaca via Lavaca Bay, Lavaca 
and Navidad Rivers to Red Bluff, a distance of 20 miles. 
Mar. 2, 1945 A harbor of refuge 9 feet deep near Port Lavaca and an approach channel 
100 feet wide and equal depth. 
Jul. 3, 1958 Deepen to 12 feet and widen to 125 feet Port Lavaca Channel and 
approach channel to harbor of refuge; deepen to 12 feet Port Lavaca 
turning basin and basins at harbor of refuge. 
Jul. 3, 1958 An entrance channel 38 by 300 feet, a channel 36 by 200 feet, 22 miles 
long across Matagorda and Lavaca Bays to Point Comfort, Texas, a 
turning basin 36 feet deep and 1,000 feet square at Point Comfort, and 
dual jetties at entrance from gulf. 
H. Doc. 314, 76th Cong., 
1st Sess. 
H. Doc. 731, 79th Cong., 
2nd Sess. 
H. Doc. 131, 84th Cong., 
1st Sess. 
H. Doc. 388, 84th Cong., 
2nd Sess. 
11. Jul 25, 1912 
Sep. 22, 1922 
Sep. 22, 1922 
Mar. 3, 1925 
SABINE-NECHES WATERWAY, TX 
Existing project dimensions of jetties, a 26-foot channel through Sabine 
Pass, Port Arthur Canal and Port Arthur turning basin; and a 26-foot 
turning basin at Port Arthur. A depth of 25-feet in Sabine-Neches Canal, 
Neches River to Beaumont and Sabine River to Orange, including cutoffs 
and widening channels. 
Deepen channels to 30 feet from gulf to Beaumont, with increased 
widths and an anchorage basin in Sabine Pass. 
Deepen Port Arthur east and west turning basins and approach channel 
to 30 feet. Thke over and deepen to 30 feet channel connecting west 
turning basin with Thylors Bayou turning basin. For a 30-foot depth 
in channel from mouth of Neches River to cutoff in Sabine River near 
Orange. 
Removal of guard lock in Sabine-Neches Canal. 
Jan. 21, 1927 Widen Sabine Pass and jetty channel, Port Arthur Canal, and Sabine- 
Neches Canal. For dredging 2 passing places in Sabine-Neches Canal, 
easing of bends, removal and reconstructing Port Arthur field office, 
extending Beaumont turning basin upstream 200 feet above new city 
wharves, and an anchorage basin in Sabine Pass. 
Aug. 30, 1935"11 A depth of 32 feet in channels from gulf to Beaumont turning basin, 
including all turning basins at Port Arthur. 
Aug. 30, 1935" 
Aug. 30, 1935 
Aug. 26, 1937 
Aug. 26, 1937 
Jun. 20, 193822 
Deepen channels to 34 feet with increased widths from gulf to Beaumont 
turning basin. 
Construct suitable permanent protective works along Sabine Lake. 
Maintain Thylors Bayou turning basin. 
Maintain channel from Sabine River to Orange Municipal wharf. 
Dredging 500 feet from eastern end of Harbor Island and abandonment 
of channel south and west of Harbor Island. 
Increased widths of channels from gulf to Beaumont turning basin and 
channel connecting Port Arthur west turning basin and Thylors Bayou 
turning basin, deepen Beaumont turning basin and Beaumont turning 
extension to 34 feet; and dredge a new cutoff from Smith's Bluff cutoff 
to McFadden Bend. 
Oct. 17, 1940 Abandon Orange turning basin; dredge a channel 25 by 150 feet, suitably 
widened on bends to highway bridge, and dredge a cutoff channel 
opposite Orange. 
Mar. 2, 1945 Extend Beaumont turning basin upstream 300 feet. 
Mar. 2, 1945 Widen Port Arthur west turning basin to 600 feet. 
H. Doc. 773, 61st Cong., 
2nd Sess. 
H. Doc. 975, 66th Cong., 
3rd Sess. 
S. Doc. 152, 67th Cong., 
2nd Sess. 
H. Doc. 234, 68th Cong., 
1st Sess. 
H. Doc. 287, 69th Cong., 
1st Sess. 
Rivers and Harbors 
Committee Doc. 27, 
72nd Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 12, 
74th Cong., 1st Sess. 
Specified in Act. 
Rivers and Harbors 
Committee Doc. 3, 
75th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 20, 
75th Cong., 1st Sess. 
H. Doc. 581, 75th Cong., 
3rd Sess. 
S. Doc. 14, 77th Cong., 
1st Sess. 
H. Doc. 685, 76th Cong., 
3rd Sess. 
S. Doc. 60, 77th Cong., 
1st Sess. 
15-27 
Mar. 2, 1945

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 15-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Mar. 2, 1945 Dredge a channel from Beaumont turning basin to vicinity of 
Pennsylvania Shipyard. 
Jul. 24, 194623 Deepen Sabine Pass outer bar channel to 37 feet, Sabine Pass jetty 
channel to 36 feet at inner end, deepen to 36 feet Sabine Pass Channel, 
Port Arthur Canal, Port Arthur east and west turning basins, Taylors 
Bayou turning basin and channel from Port Arthur west turning basin 
to Taylors Bayou turning basin, deepen to 36 feet and widen to 400 
feet Sabine-Neches Canal from Port Arthur Canal to mouth of Neches 
River except through Port Arthur Bridge; deepen Neches River channel 
from mouth to Beaumont turning basin to 36 feet widening to 350 feet 
from Smith's Bluff to Beaumont turning basin; deepen junction area 
on Neches River at Beaumont turning basin to 36 feet; and widen 
Sabine-Neches Canal between Neches and Sabine Rivers to 150 feet. 
Jul. 24, 194624 Improve Cow Bayou, Texas, by construction of a channel 100 feet wide 
and 13 feet deep extending from navigation channel in Sabine River 
to a point 0.5 mile above county bridge at Orangefield, Texas, with a 
turning basin. 
Jul. 24, 1946 Improve Adams Bayou, Texas, to provide a channel 12 feet deep and 
100 feet wide extending from 12-foot depth in Sabine River to first county 
highway bridge across bayou. 
May 17, 1950 Deepen to 36 feet and widen to 400 feet the Sabine-Neches Canal near 
Port Arthur bridge; reconstruct Port Arthur Bridge and relocate Port 
Arthur field office. 
Sep. 3, 195425 Rectification of certain reaches of existing Sabine Pass Channel, Sabine- 
Neches Canal, and Neches River and Sabine River Channel; widen 
to 350 feet entrance channel to Port Arthur turning basins; widen curve 
at junction of Port Arthur and Sabine-Neches Canals; relocate and 
enlarge Sabine Pass anchorage basin to 34 by 1,500 by 3,000 feet; widen 
to 200 feet Sabine-Neches Canal from mouth of Neches River to mouth 
of Sabine River and Sabine River Channel to upper end of existing 
project at Orange, except for channel around Harbor Island at Orange; 
deepen to 30 feet Sabine River Channel from cutoff near Orange 
municipal slip to upper end of project, except around Harbor Island; 
and enlarge area at entrance to Orange municipal slip to provide a 
maneuvering basin. 
Oct. 23, 196226 Improve outer bar channel to 42 and 40 feet for all inland channels 
to Port Arthur and Beaumont; width of 500 feet in Port Arthur Canal 
and 400 feet in Neches River Channel to Beaumont with three turning 
points in Neches River; a channel, 12 by 125 feet, extending in Sabine 
River to Echo; and replace an obstructive bridge at Port Arthur, Texas. 
Deauthorization of uncompleted portion of channel between Port Arthur 
west turning basin and Taylors Bayou turning basin and enlargement 
of entrance channel to Port Arthur turning basins. 
TEXAS CITY CHANNEL, TX 
12. Mar. 4, 1913 A channel 300 by 30 feet and construct a pile dike 28,200 feet long 
north to channel. 
Jul. 3, 1930 A harbor 800 by 30 feet at Texas City, and construct a rubblemound dike. 
Aug. 30, 193511 Extension of rubblemound dike to shoreline. 
Aug. 30, 1935 Deepen channel and harbor to 32 feet. 
Aug. 30, 1935 Deepen channel and harbor to 34 feet. 
S. Doc. 158, 77th Cong., 
2nd Sess. 
H. Doc. 571, 79th Cong., 
2nd Sess. 
H. Doc. ')2, 79th Cong., 
2nd Sess. 
H. Doc. 626, 79th Cong., 
2nd Sess. 
H. Doc. 174, 81st Cong., 
1st Sess. 
S. Doc. 80, 83rd Cong., 
2nd Sess. 
H. Doc. 553, 87th Cong., 
2nd Sess.' 
H. Doc. 1390, 62nd 
Cong., 
3rd Sess. 
H. Doc. 107, 71st Cong., 
1st Sess. 
Rivers and Harbors 
Committee Doc. 4, 
73rd Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 46, 
73rd Cong., 2nd Sess. 
Rivers and Harbors 
Committee Doc. 62, 
74th Cong., 1st Sess. 
15-28

GALVESTON, TEXAS DISTRICT 
AUTHORIZING LEGISLATION TABLE 15-B 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Aug. 26, 1937 Extend harbor 1,000 feet southward, 800 by 34 feet. 
Jun. 30, 1948 Deepen channel and harbor to 36 feet, widen channel to 400 feet and 
harbor to 1,000 feet and changing name of project to "TEXAS CITY 
CHANNEL, TEXAS." 
Jul. 14, 1960 Deepen channel and turning basin to 40 feet and construct 16-foot 
Industrial Barge Canal. 
Oct. 12, 1972 Widen the existing main turning basin to 1,200 feet including relocation 
(Senate Res.) of the basin 85 feet to the east; providing a 40-foot deep channel in 
Oct.12, 1972 the Industrial Canal at widths of 300-400 feet, with a turning basin 
(House Res.) at the head of the canal 40 feet deep, 1,150 feet long, and 1,000 feet 
wide, and easing of the bend at the entrance to the canal, and 
deauthorization of shallow-draft Industrial Barge Canal not incorporated 
in the plan of improvement above. 
Nov. 17, 1986 Depening the Texas City Turning Basin to 50 feet, enlarging the 6.7 
mile long Texas City Channel to 50 feet by 600 feet; deepening the 
existing 800-foot wide Bolivar Roads Channel and Inner Bar Channel 
to 50 feet; deepening the existing 800-foot wide Outer Bar and Galveston 
Entrance Channels to 52 feet; extending the Galveston Entrance Channel 
to a 52 foot depth for 4.1 miles at a width of 800 feet and an additional 
reach at a width of 600 feet to the 52 foot contour in the Gulf of Mexico; 
and establishment of 600 acres of wetland and development of wateroriented 
recreational facilities on a 90-acre enlargement of the Texas 
City Dike. 
TRINITY RIVER AND TRIBUTARIES, TX 
Rivers and Harbors 
Committee Doc. 47, 
75th Cong., 1st Sess. 
H. Doc. 561, 80th Cong., 
2nd Sess. 1 
H. Doc. 427, 86th Cong., 
2nd Sess. 
H. Doc. 199, 92nd Cong., 
2nd Sess. 
(Sec. 201, PL 89-298) 
Sec. 201, PL 99-662 
13. Mar. 3, 1905 
Jul. 25, 1912 
Sep. 22, 1922 
Anahuac Channel. 
Six-foot channel to Liberty. 
Abandon improvements above Liberty and terminate all improvements 
by lock and dam, leaving a 6-foot channel from Liberty to mouth. 
Mar. 2, 1945 Provides for a navigable channel from the Houston Ship Channel near 
Red Fish Bar in Galveston and Trinity Bays to the mouth of Trinity 
River and 9 feet deep and 150 feet wide in the river section, with a 
turning basin at Liberty. 
Jul. 24, 1946 Modification of the project to provide for a channel 9 feet deep and 
150 feet wide from the Houston Ship Channel near Red Fish Bar in 
Galveston Bay extending along the east shore of Trinity Bay to the mouth 
of the Trinity River at Anahuac, including protective spoil embankment 
on the bay side of the channel in lieu of the 9 by 200-foot channel in 
Galveston and Trinity Bays. 
Oct. 23, 1962 Provides for the multiple-purpose Wallisville Reservoir, including a 
navigation lock in the Wallisville Dam at Channel Mile 28.30 and 
advancement of the Channel to Liberty from one mile below Anahuac 
(Mile 23.2) to the Texas Gulf Sulphur Company's slip at Channel Mile 
35.8, and incorporation into existing project Anahuac Channel and mouth 
of Trinity River projects. 
Oct. 27, 1965 Reevaluation of navigation benefits. 
Jul. 30, 1983 
16. Dec. 15, 1970 
(House Res.) 
Dec. 17, 1970 
(Senate Res.) 
Modified Wallisville Reservoir by reducing the size to 5,600 acres and 
confining the reservoir to east side of Trinity River. 
CORPUS CHRISTI BEACH, TX (RESTORATION PROJECT) 
Restoration and periodic nourishment of 1.4 miles of beach. 
H. Doc. 989, 66th Cong., 
3rd Sess. 
H. Doc. 403, 77th Cong., 
1st Sess. 
H. Doc. 634, 79th Cong., 
2nd Sess. 
H. Doc. 215, 87th Cong., 
1st Sess. 
H. Doc. 276, 89th Cong., 
1st. Sess. 
PL 98-63 
H. Doc. 415, 91st Cong., 
2nd Sess. 
(Sec. 201, PL 89-298) 
15-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 15-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
BUFFALO BAYOU AND TRIBUTARIES, TX 
18. Jun. 20, 1938 Barker and Addicks Reservoirs, Texas. 
Sep. 3, 1954 Clearing, straightening, enlarging and lining of Buffalo, Brays, and 
White Oak Bayous. 
Oct. 27, 1965 Extend upper limits of White Oak Bayou upstream about 2.1 miles from 
BRI RR bridge to mouth of Cole Creek. 
CLEAR CREEK, TX 
19. Aug. 13, 1968 Channel enlargement and rectification from upper end of Clear Lake 
at Mile 3.8 to improved channel Mile 34.8.30 
Nov. 17, 1986 Modified local cooperation requirements of the 1968 authorization. 
LOWER RIO GRANDE BASIN, TX 
20. Nov. 17, 1986 Channel improvements to provide drainage protection for the area in 
Hidalgo and Willacy Counties north of U.S. Highway 83, and for the 
area between U.S. Highway 83 and the Rio Grande in Hidalgo County; 
and to provide flood protection for the cities of McAllen, Edinburg, 
Raymondville, Edcouch, La Vila, and Lyford. 
PORT ARTHUR AND VICINITY, TX (HURRICANE-FLOOD 
PROTECTION) 
21. Oct. 23, 1962 Raising and reconstructing 6.3 miles of existing seawall; constructing 
0.3 mile of new seawall, 20.3 miles new levees and five pumping plants; 
and raising and improving 7.5 miles of existing levees. 28 
SIMS BAYOU, TX 
22. Nov. 17, 1986 Enlargement and rectification, with appropriate erosion control 
measures of 19.31 miles of Sims Bayou; environmental measures and 
riparian habitat along entire alignment, and recreational development. 
TAYLORS BAYOU, TX 
23. Oct. 27, 1965 Enlarging and rectifying channels; construction of diversion channel; 
a salt water gate; enlargement of GIWW 1.3 miles and alteration of 
State Highway 87 bridge. 29 
TEXAS CITY AND VICINITY, TX (HURRICANE-FLOOD 
PROTECTION) 
24. Jul. 3, 1958 Construction of improvements for control of storm tides, consisting of 
new and enlarged levees and floodwalls approximately 14.1 and 2.1 miles 
in length; related drainage and stoplog structures; a navigation opening 
and pumping plants. 
UPPER WHITE OAK BAYOU, TX 
25. Nov. 17, 1986 Channel improvements in White Oak Bayou from Mile 10.7 to Mile 
19.9; on Cole Creek from its mouth to Mile 4.9; and on Vogel Creek 
from it mouth to Mile 4.5; and recreational development on project 
lands along White Oak Bayou, between Mile 14.6 and Mile 18.3. 
VINCE AND LITTLE VINCE BAYOUS, TX 
H. Doc. 456, 75th Cong., 
2nd Sess. 
H. Doc. 250, 83rd Cong., 
2nd Sess. 1 
H. Doc. 169, 89th Cong., 
1st Sess. 
H. Doc. 351, 90th Cong., 
2nd Sess. 
Sec. 101, PL 99-662 
Sec. 401, PL 99-662 
H. Doc. 505, 87th Cong., 
2nd Sess.' 
Sec. 401, PL 99-662 
H. Doc. 206, 89th Cong., 
1st Sess.' 
H. Doc. 347, 85th Cong., 
2nd Sess. l 
Sec. 401, PL 99-662 
26. Oct. 23, 1962 Enlarging and rectifying channel of Vince Bayou and Little Vince Bayou 
upstream for a total of 11.5 miles for both streams. 
H. Doc. 441, 87th Cong., 
2nd Sess.' 
1 Contains latest published maps. 
2 Extension of north jetty 1,950 feet and south jetty 1,265 feet 
considered inactive 
3 Dredging 2,000 by 650-foot northerly extension of inner basin 
deauthorized. 
a Included in Public Works Administration program September 
6, 1933 and February 16, 1935. 
SWest leg of Wye junction with main channel deauthorized. 
6 Construction of lock in diversion dam at local expense 
considered inactive. 
SDredging upper .5 mile of channel to vicinity of Stauffer 
Chemical plant was deauthorized under Sec. 12 of PL 93-251. 
Included in Public Works Administration program September 6, 
1933. 
8 Dredging 43rd to 51st Streets was deauthorized under Sec. 12 
of PL 93-251. 
15-30

GALVESTON, TEXAS DISTRICT 
AUTHORIZING LEGISLATION 
9 Deauthorized under Sec. 12 of PL 93-251. 
o1D0e epening 43rd to 57th Streets was deauthorized under Sec. 
12 of PL 93-251 
11 Previously authorized September 6, 1933 by Public Works 
Administration. 
12 H. Doc. 230, 76th Cong., 1st Sess. and project documents 
contain latest published maps. 
13 Dredging upper 3.5 miles was deauthorized under Sec. 12 of 
PL 93-251. 
14 Dredging upper 5 miles was deauthorized under Sec. 1001 of 
PL 99-662. 
15 Inactive. 
16 Portion of 16-foot by 150-foot channel from Sabine River to 
Houston Ship Channel is inactive. Relocation of channel in 
Matagorda Bay deauthorized under Sec. 12 or PL 93-251. 
17 The 9 feet by 100 feet channel from Mile 8.2 to Mile 13.2 in 
Chocolate Bayou was deauthorized under Sec. 1001 of PL 99-662. 
18 Construction of pile dike was deauthorized under Sec. 12 of 
PL 93-251. 
19 Hill Street Bridge to mouth of White Oak Bayou was 
deauthorized under Sec. 12 of PL 93-251. 
20 Deepening channel to 40 feet from Southern Pacific Slip to 
Brady Island was deauthorized under Sec 12 of PL 93-251. 
21 The 12-foot channel from mile 1.65 to mile 2.81 deauthorized 
under Sec. 12 of PL93-251. 
22 Complete widening of channel between Port Arthur west 
turning basin and Taylors Bayou turning basin deauthorized by 1962 
R&H Act. 
23 Complete deepening of channel between Port Arthur west 
turning basin and Taylors Bayou turning basin deauthorized by 1962 
R&H Act. 
24 Channel extension above Cow Bayou turning basin near 
Orangefield was deauthorized under Sec. 12 of PL 93-251. 
25 Widening to 350 feet entrance channel to Port Arthur turning 
basin deauthorized by 1962 R&H Act. 
26 The 12-foot channel in Sabine River from Orange to Echo, 
Texas deauthorized under Sec. 12 of PL93-251. 
27 Jetty extension was deauthorized under Sec. 1001 of 
PL 99-662. 
28 Raising and strengthening of levees surrounding Gulf Oil 
Company's fresh water reservoir is inactive. 
29 Enlarging 7.0 miles of North Fork Taylors Bayou, 7.8 miles of 
South Fork Taylors Bayou and 4.4 miles of Mayhaw Bayou are 
inactive. 
30 Portion of project upstream of Brazoria/Galveston County line, 
approximately mile 18.5, in inactive category. 
31 Turning basin was deauthorized under Sec. 1001 of 
PL 99-662. 
15-31 
L I TABLE 15-B

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 15-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost To September 30, 1987 
Full Report 
See Annual Operation and 
Project Report For Construction Maintenance 
Aquatic Plant Control (1958 and 1962 River and Harbor Acts)6 1967 38,2521 - 
Bastrop Bayou, TX2 1931 9,920 27,129 
Brazos River, TX, Velasco to Old Washington3 1924 216,9894 223,010 
Cedar Bayou, TX7 1984 681,2635 2,089,3166 
Clear Creek and Clear Lake, TX 1982 66,934 537,139 
Corpus Christi, TX, Channel to Navy Seaplane Base 
Encinal Peninsula 1968 1,194,344 26,467 
Dickinson Bayou, TX 1954 33,942 57,553 
East Bay (Hanna Reef), TX8 1922 2,476 847 
Johnson Bayou, LA9 1933 2,261 54,042 
Little Bay, TX'� 1979 - 252,728 
Neches River and Trib., Salt Water Barrier 
at Beaumont, TX (Advance Engineering & Design) 1984 1,503,843 - 
Oyster Creek, TX 1922 6,942 7,556 
Sabine River and Tributaries, TX (Echo to Morgan Bluff)3 1971 - - 
1 Excludes $1,672 work contribution. 7 Mile 3 to Mile 11 deauthorized under Sec. 12 of PL 93-251. 
2 Widening from 60 feet to 100 feet at 4-foot depth was 8 In inactive category for maintenance. 
deauthorized under Sec. 12 of PL 93-251. 9 Channel adequate for existing commerce. 
3 Deauthorized under Sec. 1001 of PL 99-662. 10 Aransas County Navigation District, Rockport, TX., 
4 Includes $123,676 for previous projects. constructed project as authorized by 1950 River and Harbor Act 
5 Includes $39,087 for previous projects. In addition, $25,000 (H. Doc. 114, 81st Cong., 1st Sess.) in 1955 under Department 
expended from contributed funds. of Army permit. 
6 Includes $69,784 for previous projects. 
TABLE 15-D OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost To September 30, 1987 
Full Report 
See Annual Operation and 
Project Report For Construction Maintenance 
Arroyo Colorado, Rio Hondo, TX 1986 201,300 - 
Baytown, Texas' 1980 245,400 - 
Colorado River, Matagorda, Texas2 1963 273,757 - 
Freeport and Vicinity, Texas, Hurricane-Flood Protection 2 1984 29,285,0423 - 
Guadalupe River (Remove Log Jams), Texas2 1978 505,749 - 
Highland Bayou, Texas2 1984 12,254,390 - 
Lavaca-Navidad River, Texas: 
Hallettsville Project 1961 256,043 - 
General channel project 1952 21,086 - 
Liberty Local Protection Project, Texas6 1971 98,517 - 
Mill Creek, Texas' 1952 24,753 - 
Peyton Creek, Texas4 1975 66,377 - 
San Diego Creek, Alice, Texas2 1963 135,175 - 
Tranquitas Creek, Kingsville, Texas2 1956 130,239 - 
Three Rivers, Texas5 s 5,835,927 - 
1 Inactive. 
2 Completed. 
3 In addition, $8,695,438 expended from contributed funds, 
$1,126,905 estimated value of contributed lands, and $2,726,446 
for relocations by local interests. 
4 Deauthorized under Sec. 12 of PL 93-251. 
s See Annual Report for 1983, Fort Worth District, page 16-12. 
6 Deauthorized under Sec. 1001 of PL 99-662. 
15-32

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 15-E TOTAL COST OF EXISTING PROJECTS TO SEPTEMBER 30, 1987 
See 
Section 
in Text Project Funds New Work Maintenance Rehabilitation Total 
2. Brazos Island Harbor, TX 
3. Channel to Port Bolivar, TX 
4. Corpus Christi Ship 
Channel, TX 
6. Freeport Harbor, TX 
7. Galveston Harbor and 
Channel, TX 
8. Gulf Intracoastal Waterway 
between Apalachee Bay, FL 
and the Mexican Border 
(Galveston District) 
9. Houston Ship Channel, TX 
11. Sabine-Neches Waterway, TX 
12. Texas City Channel, Tx 
13. Trinity River and 
Tributaries, TX 
Regular 
Public Works 
Contributed 
Total cost of project 
Regular 
Total cost of project 
Regular 
Public Works 
Contributed 
Total 
Value of useful work 
performed 
Contributed land 
Total cost of project 
Regular 
Public Works 
Contributed 
Total 
Value of useful work 
performed 
Total cost of project 
Regular 
Channel 
Seawall 
Public Works 
Contributed 
Total cost of project 
Regular 
Public Works 
Contributed 
Total 
Value of useful work 
performed 
Contributed land 
Total cost of project 
Regular 
Public Works 
Contributed 
Total cost of project 
Regular 
Public Works 
Contributed 
Total 
Value of useful work 
performed 
Contributed land 
Total cost of project 
Regular 
Public Works 
Contributed 
Total cost of project 
Regular 
Contributed 
Total cost of project 
$ 8,535,050 
2,848,560 
1,683,258 
13,066,868 
85,214 
85,214 
61,710,653 
324,287 
4,297,782 
66,332,722 
1,716,695 
276,720 
68,326,137 
4,052,290 
116,575, 
1,143,203 
5,312,068 
360,249 
5,672,317 
11,920,187 
8,754,209 
3,648,932 
24,323,328 
60,568,791 
466,477 
3,557,433 
64,592,701 
395,000 
139,776 
65,127,477 
29,042,293 
2,612,932 
1,382,760 
33,037,985 
49,592,331 
1,363,652 
2,103,435 
53,059,418 
32,000 
116,760 
53,208,178 
13,877,878 
136,296 
1,023,819 
15,037,993 
27,124,164 
66,000 
27,190,164 
$ 40,038,560 
14,692 
40,053,252 
1,130,791 
1,130,791 
84,671,385 
445,269 
85,116,654 
85,116,654 
43.988,786 
229,311 
44,218,097 
44,218,097 
75,443,920 
512,163 
13,121 
2,099,360 
78,068,564 
205,569,102 
22,672 
205,591,774 
205,591,774 
101,522,694 
462,578 
101,985,272 
136,320,372 
2,868,071 
139,188,443 
139,188,443 
21,768,354 
21,768,354 
10,024,771 
10,024,771 
$ 2,170,080 
2,170,080 
3,576,684 
3,576,684 
3,576,684 
8,935 
8,935 
$ 50,743,690 
2,848,560 
1,697,950 
55,290,200 
1,216,005 
1,216,005 
149,958,722 
324,287 
4,743,051 
155,026,060 
1,716,695 
276,720 
157,019,475 
48,050,011 
116,575 
1,372,514 
49,539,100 
- 360,249 
8,935 49,899,349 
7,373,356 94,737,463 
595,973 9,862,345 
- 13,121 
- 5,748,292 
7,969,329 110,361,221 
1,270,511 267,408,404 
- 466,477 
- 3,580,105 
1,270,511 271,454,986 
- 395,000 
- 139,776 
1,270,511 271,989,762 
- 130,564,987 
- 2,612,932 
- 1,845,338 
- 135,023,257 
- 185,912,703 
- 1,363,652 
- 4,971,506 
- 192,247,861 
- 32,000 
- 116,760 
- 192,396,621 
726,158 36,372,390 
- 136,296 
- 1,023,819 
726,158 37,532,505 
- 37,148,935 
- 66,000 
- 37,214,935 
15-33

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1887 
TABLE 15-F CHANNEL DIMENSIONS 
Adopted Project Dimensions Improved Project Dimensions 
See Depth in Feet Bottom Depth in Feet Bottom 
Section (Below Mean Width (Below Mean Width Length 
in Text Project Section of Waterway Low Tide) (Feet) Low Tide) (Feet) Feet Miles 
2. Brazos Island 
Harbor, TX 
4. Corpus Christi 
Ship Channel, TX 
6. Freeport 
Harbor, TX 
7. Galveston Harbor 
and Channel, TX 
Outer Bar and Jetty Channel 44-42 
Padre Island to Long Island 42 
Long Island to Goose Island 42 
Goose Island to Turning Basin 
Extension 42 
Turning Basin Extension 42 
Brownsville Turning Basin 36 
Port Isabel Channel via East Turnout 36 
West Wye, from Brownsville Channel 36 
Port Isabel Turning Basin 36 
Fishing Boat Harbor: 
West Basin 15 
Middle Basin 15 
East Basin 15 
Connecting Channel 15 
Entrance Channel 15 
Aransas Pass Outer Bar Channel 
Channel 47 
Aransas Pass Jetty Channel 45 
Inner Basin at Harbor Island 45 
Channel to Port Aransas 12 
Port Aransas Turning Basin 12 
Anchorage Basin at Port Aransas 12 
Inner Basin to Mile 8.5 45 
Mile 8.5 to LaQuinta Junction 45 
LaQuinta Junction to Corpus 
Christi Turning Basin 45 
Corpus Christi Turning Basin 45 
Industrial Canal 45 
Avery Point Turning Basin 45 
Channel to Chemical Turning Basin 45 
Chemical Turning Basin 45 
Tule Lake Channel 45 
Tule Lake Turning Basin 45 
Viola Channel 45 
Viola Turning Basin 45 
Channel to LaQuinta 45 
LaQuinta Turning Basin 45 
Turning Point at LaQuinta 
Channel Junction 45 
Jewel Fulton Canal 12 
Jewel Fulton Turning Basin 12 
Mooring Area at Ingleside: 
Mooring Area (a) 45 
Mooring Area (b) 45 
Outer Bar Channel 47 
Jetty Channel 45 
Quintana Turning Basin 45 
Channel to Brazosport Turning Basin 45 
Brazosport Turning Basin 45 
Channel to Upper Turning Basin 45 
Upper Turning Basin 45 
Channel to Stauffer Chemical Plant 30 
Stauffer Turning Basin 30 
Brazos Harbor Channel 36 
Brazos Harbor Turning Basin 36 
Entrance Channel 52 
Outer Bar Channel 52 
Inner Bar Channel 50 
Anchorage Basin 36 
15-34 
400 
300 
300 
38-36 
36 
36 
2.1 
2.5 
9.6 
300 
500 
1,000 
200 
200 
1,000 
370-305 
370-305 
370 
270 
100 
36 
36 
36 
36 
36 
36 
15 
15 
15 
15 
15 
300 
200 
200 
200 
500 
1,200 
200 
200 
1,000 
370-305 
370-305 
370 
265 
100 
700 
600 
Irregular 
100 
2002 
300-400 
600-500 
500 
400 
1,000 
400 
1,000 
350 
1,0503 
200 
900 
200-250 
700-900 
300-400 
1,200 
1,2503 
100 
200 
150 
300 
200 
200-350 
744-800 
350-375 
600 
200 
500 
200 
525-675 
800 
800 
800 
2,875 
700 
600-730 
730-1,720 
100-150 
200-4002 
300-400 
600-500 
500 
400 
800 
400 
975 
400 
1,200 5 
300 
1,200 
300-350 
1,200 
300-400 
1,200 
1,2503 
100 
200 
47 
45 
45 
12 
12 
12 
45 
45 
40-45 
45 
45 
45 
45 
45 
40 
40 
40 
40 
45 
45 
45 
12 
12 
3.2 
1.3 
2,670 0.5 
1.4 
0.8 
1,300 0.2 
1,470 0.3 
1,200 0.2 
1,470 .03 
1,230 0.2 
770 0.1 
1.8 
1.0 
1,550 - 
0.1 
200 - 
900 0.2 
8.5 
3.6 
8.6 
5,423 1.0 
1.1 
1,150 0.2 
1,690 
1,000 
1,000 
800 
1,250 
400 
667 
600 
500 
675 
0.6 
0.3 
3.1 
0.2 
1.8 
0.2 
5.6 
0.1 
0.2 
0.8 
0.1 
0.8 
3.0 
0.8 
1.2 
0.1 
1.4 
0.1 
1.1 
0.1 
0.5 
0.1 
4.7 
1.7 
3.2 
1.8' 
150 
150 
400 
400 
7504 
400 
1,0004 
375 
1,2004 
200 
500 
200 
7504 
800 
800 
800 
2,8751' 
45 
38 
36 
36 
36 
36 
36 
30 
25 
30 
30 
42 
42 
40 
36

GALVESTON, TEXAS DISTRICT 
CHANNEL DIMENSIONS TABLE 15-F 
Adopted Project Dimensions Improved Project Dimensions 
See Depth in Feet Bottom Depth in Feet Bottom 
Section (Below Mean Width (Below Mean Width Length 
in Text Project Section of Waterway Low Tide) (Feet) Low Tide) (Feet) Feet Miles 
7. (Continued) 
9. Houston Ship 
Channel, TX 
Bolivar Roads Channel 50 800 40 800 - 1.0 
Bolivar Roads Channel to 43rd St. 
Bolivar Roads to Morgan Point 
Morgan Point to Boggy Bayou 
Boggy Bayou to Greens Bayou 
Greens Bayou to Sims Bayou 
Hunting Bayou Turning Point 
Clinton Island Turning Basin 
Sims Bayou to Southern Pacific Slip 
Southern Pacific Slip to 
Houston Turning Basin 
Houston Turning Basin 
Upper Turning Basin 
Brady Island Channel 
Barbour Terminal Channel 
Turning Basin 
Five-Mile Cut Channel 
Light-Draft Channel: 
Upper Turning Basin to Jensen Drive 
Turkey Bend Channel 
Greens Bayou Channel: 
Mile 0 to Mile 0.36 
Mile 0.36 to Mile 1.57 
Outer Bar and Jetty Channel 
Channel to Point Comfort 
Approach Channel to Turning Basin 
Turning Basin 
Channel to Port Lavaca 
Lynn Bayou Turning Basin 
Channel to Harbor of Refuge 
North-South Basin 
East-West Basin 
Channel to Red Bluff 
Sabine Bank Channel 
Sabine Pass Outer Bar Channel 
Sabine Pass Jetty Channel 
Sabine Pass Anchorage Basin 
Sabine Pass Channel 
Port Arthur Canal 
Entrance to Port Arthur Turning Basins 40 
Port Arthur East Turning Basin 40 
Port Arthur West Turning Basin 40 
Channel connecting Port Arthur West 
and Taylors Bayou Turning Basins 40 
Taylors Bayou Turning Basin 40 
Sabine-Neches Canal, Port Arthur 
Canal to Neches River 40 
Turning Point at Mile 19.5 40 
Neches River, Mouth to Maneuvering 
Area Beaumont Turning Basin 40 
Turning Point, Mile 31.1 40 
Turning Point, Mile 36.6 40 
Turning Point, Mile 40.3 40 
Channel Extension, Mile 40.3 36 
Maneuvering Area at Beaumont 
Turning Basin 40 
Beaumont Turning Basin 34 
Beaumont Turning Basin Extension 34 
Beaumont Turning Basin Extension to 
End of Project Channel Vicinity 
Bethlehem Steel Company 30 
1,125 
400 
400 
300 
300 
900-1,0009 
8009 
300 
300 
400-1,000 
150 
60 
100 
1,100 
125 
40 
40 
40 
40 
40 
40 
40 
40 
36 
36 
36 
10 
16 
16 
8 
10 
10 
36 
15 
38 
36 
36 
36 
12 
12 
12 
12 
12
6 
42 
42 
40 
40 
40 
40 
175 
100 
300 
300-2006 
200-300 
1,000 
125 
27-340 
125 
300 
250 
100 
800 
800 
800-500 
1,500 
500 
500 
275-678 
420 
600 
200-250 
150-1,000 
400 
9004 
400 
1,0004 
1,0004 
1,0004 
350 
Irregular 
500 
350 
200 
40 
40 
40 
40 
40 
40 
40 
40 
36 
36 
36 
10 
16 
16
8 
10 
10 
36 
15 
38 
36 
36 
36 
12 
12 
12 
12 
12 
6 
42 
42 
40 
40 
40 
40 
40 
40 
40 
40 
40 
40 
40 
40 
40 
40 
40 
36 
40 
34 
34 
1,125 
400 
400 
300 
300 
948-1,0009 
965-1,0709 
300 
300 
400-1,000 
150 
60 
100 
1,100 
125 
1,375 
1,592 
3,100 
1,000 
1,000 
60 
60 
175 
100 
300 
300-2006 
200-300 
1,000 
125 
27-340 
125 
300 
250 
100 
800 
800 
800-500 
1,500 
500 
500 
275-678 
370-547 
350-550 
3.9 
26.2 
12.8 
2.4 
5.3 
0.6 
2.9 
0.6 
0.2 
0.9 
1.5 
0.2 
1.9 
- 4.1 
- 0.8 
- 0.3 
- 1.3 
- 3.2 
- 20.9 
- 1.1 
1,000 
532 
1,682 
1,750 
3,000 
0.2 
4.1 
0.1 
1.9 
0.3 
0.3 
20.2 
14.7 
3.4 
4.1 
5.6 
6.2 
- 0.3 
1,765 0.3 
1,610 0.3 
200-250 - 0.6 
90-1,233 3,470 0.7 
400 - 11.2 
9004 _- 8 
400 
1,000 
1,000 
1,300 
350 
Irregular 
160-535 
300 
30 200 
700 
930 
1,530 
1,265 
18.3 
0.2 
1,300 0.2 
1,500 0.3 
- 0.4 
- 0.7 
15-42 
60 
60 
10. Matagorda Ship 
Channel, TX 
11. Sabine-Neches 
Waterway, TX 
15-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 15-F CHANNEL DIMENSIONS 
Adopted Project Dimensions Improved Project Dimensions 
See Depth in Feet Bottom Depth in Feet Bottom 
Section (Below Mean Width (Below Mean Width Length 
in Text Project Section of Waterway Low Tide) (Feet) Low Tide) (Feet) Feet Miles 
11. (Continued) Sabine-Neches Canal, Neches 
River to Sabine River 30 200 30 200 - 4.4 
Sabine River Channel, Mouth to 
Foot of Green Ave. 30 200 30 200 - 9.5 
Orange Turning Basin 30 Irregular 30 Irregular 1,550 0.3 
Orange Municipal Slip 30 200 30 150-200 2,435 0.5 
Old Channel Around Harbor Island 25 150-200 25 150-200 - 2.4 
Channel to Echo7 12 125 - - - - 
Adams Bayou 12 100 12 100 - 1.7 
Cow Bayou 13 100 13 100 - 7.0 
Orangefield Turning Basin 13 300 13 300 500 0.1 
1 Average. 
2 Includes 100-foot channel width. 
3 Includes 450-foot channel to Corpus Christi. 
a Diameter. 
s Includes 350-foot channel width. 
6 300-foot width through Matagorda Peninsula. 
7 Deauthorized. 
8 Included in channel length. 
9 Includes 300-foot channel width. 
15-36

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
GULF INTRACOASTAL WATERWAY 
APALACHEE BAY, FLORIDA TO MEXICAN BORDER 
EXISTING PROJECT DIMENSIONS, PROVIDED 
TABLE 15-G FOR IN TRIBUTARY CHANNELS 
Adopted Project Dimensions Improved Project Dimensions 
Depth in Feet Bottom Depth in Feet Bottom 
(Below Mean Width (Below Mean Width Length 
Tributary Channel Low Tide) (Feet) Low Tide) (Feet) Feet Miles 
Offats Bayou 
Main Channel 
West Wye 
Chocolate Bayou Channel1 
12-Foot Channel via 
East Turnout 2 
West Turnout 3 
9-Foot Channel 4 
Turning Basin 
San Bernard River Channel S 
Colorado River Channel 6 
Turning Basin 
Silting Basin 
Mouth of Colorado River 
Navigation Channel, GIWW to Gulf 
Turning Basin at Matagorda 
Channel to Palacios 8 
Turning Basin No. 1 
Turning Basin No. 2 
Connecting Channel 
Channel to Barroom Bay 9 
Channel to Victoria Main Channel via East Turnout 
Turning Basin 
West Turnout Channel 
Channel to Seadrift via South Turnout 
Turning Basin 
North Turnout Channel 
Harbor of Refuge at Seadrift Channel 
Basin 
Channel to Rockport 
Turning Basin 
Channel to Aransas Pass 
Turning Basin 
Channel to Conn Brown Harbor 
Conn Brown Harbor 
Channel to Port Mansfield to10 
Entrance Channel 
Approach Channel to Hopper Dredge Turning Basin 
Hopper Dredge Turning Basin 
Channel Across Padre Island and Laguna Madre 
Turnout Channels, East Side of Main Channel, GIWW 
North Turnout 
South Turnout 
Channel West Side of Main Channel, GIWW, to P.T. of 
Turnout Channels 
Turnout Channels, West Side of Main Channel, GIWW 
North Turnout 
South Turnout 
Channel from P.T. of Turnout Channels to Approach 
Channel to Main Turning Basin 
Approach Channel to Main Turning Basin 
Main Turning Basin 
Turning Basin Extension 
Small Craft Basin 
Shrimp Basin 
Channel to Harlingen via South Turnout from 
Main Channel, GIWW 
12 125 
12 125 
12 
12
999999 
15-12 
12 
12 
12 
12 
12
69999999999 
14 
14 
14 
14 
16 
16 
16 
14 
12 
12 
14 
12 125 2.3 - 
12 125 0.4 2,200 
125 
125 
100 
600 
100 
100 
400 
150 
12 
12
9999 
12 
12 
12 
12
999999 
99 
14 
14 
14 
14 
16 
16 
16 
14 
200-100 
350 
125 
200 
300 
150-480 
60 
100 
600(AVG) 
100 
100 
250 
100 
100 
200 
200 
475 
175 
300 
125 
300 
250 
100 
300 
100 
100 
100 
100 
12 200 
12 200 
14 
14 
14 
14
8 
12 
12 
125 
200 
400 
1,000 
160 
350 
125 
125 
125 
100 
100 
400 
150 
8.2 
0.8 
26.0 
15.5 
0.1 
1.0 
125 16.1 
200 0.1 
300 0.2 
130-400 0.1 
100 34.8 
500(AVG)0.1 
100 0.8 
100 2.0 
200 - 
100 0.5 
500 
635 
1,130 
800(AVG) 
230 
200 2.1 - 
342(AVG)0.2 1,225 
125-175 6.1 - 
300 0.4 2,212 
125 0.2 - 
300 0.3 1,800 
250 
100 
300 
100 
0.8 
0.4 
0.1 
7.7 
300 300 
12 100 0.6 
12 100 0.6 
14 100 0.3 
12 200 
12 200 
14 
14 
14 
14 
8 
12 
125 
200 
400 
1,000 
160 
350 
0.6 
0.6 
0.6 
0.3 
0.2 
0.1 
0.2 
0.3
1,250 
580 
860 
1,450 
12 12511 25.812 - 
15-37

GALVESTON, TEXAS DISTRICT 
GULF INTRACOASTAL WATERWAY 
APALACHEE BAY, FLORIDA TO MEXICAN BORDER 
EXISTING PROJECT DIMENSIONS, PROVIDED 
FOR IN TRIBUTARY CHANNELS TABLE 15-G 
Adopted Project Dimensions Improved Project Dimensions 
Depth in Feet Bottom Depth in Feet Bottom 
(Below Mean Width (Below Mean Width Length 
Tributary Channel Low Tide) (Feet) Low Tide) (Feet) Feet Miles 
Turning Basin near Rio Hondo 12 400 12 400 0.1 500 
North Turnout from Main Channel 12 200 12 200 0.7 - 
Port Isabel Side Channels 
Main Channel 12 125 12 125-90 0.6 - 
Main Channel 12 233-60 12 233-60 0.4 - 
South Leg 12 125 12 125 0.2 - 
Port Isabel Small Boat Harbor 
Entrance Channel 7 75 7 75 1.4 - 
Harbor Channel 6 50 6 50 0.3 - 
Boat Basin 6 Variable 6 72-501 0.2 1,308 
1 Includes the construction of a salt water barrier at Mile 16.9. 
2 Constructed 10 feet deep by 100 feet wide by local interests. 
East turnout channel constructed 150 feet wide. 
3 Constructed by local interests. 
4 Authorized to mile 13.2. Mile 8.2 to Mile 13.2 was 
deauthorized. 
5 Authorized to Mile 31 above mouth (channel mile 29.41). 
Upper 3.4 miles was deauthorized under Section 12 of PL 93-251. 
6 Includes a discharge channel from Matagorda, Texas, to the 
gulf which was dredged by local interests in 1939. (Maintenance 
will be discontinued upon completion of improvements authorized 
by R&H Act of 1968.) 
SAuthorized by R&H Act of 1968. Also provides for a dam 
across the present discharge channel, a new 250-foot 
wide by 20 to 23-feet deep discharge channel into Matagorda Bay, 
and a 15-foot by 200-foot wide entrance channel with parallel jetties 
from the gulf shoreline into the Gulf of Mexico. East jetty to be 
3,500 feet long and west jetty 2,900 feet long. 
8 Includes two protective breakwaters at entrance to turning 
basins. 
9 In the inactive category for maintenance. 
to1A0ls o provides for two stone jetties at the gulf entrance about 
1,000 feet apart. (North jetty constructed 2,300 feet long and south 
jetty constructed 2,270 feet long.) 
11 South turnout is 200 feet wide. 
12 Authorized to mile 31. Mile 25.8 to Mile 31 was deauthorized. 
15-38

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 15-H DREDGING OPERATIONS 
See 
Section 
in Thxt Project 
Brazos Island Harbor, TX 
(Maintenance)

Dredging Brownsville Channel 

December 29, 1986 to 
June 8, 1987 

1,169,359 

$1,130,809 
 
Channel to Port Bolivar, TX 
(Maintenance)
 
Dredging channel to Port Bolivar

August 4, 1987 to 
September 30, 1987

36,289

$55,500 
 
Corpus Christi Ship Channel, 
TX (New Work)

Dredging Chemical Turning Basin 
thru Tule Lake Turning Basin  

April 13, 1987 to 
September 30, 1987

646,404 

$3,551,912

Corpus Christi Ship Channel, 
TX (Maintenance) 

Dredging La Quinta Junction to 
Beacon 82
 
July 10, 1987 to 
September 30, 1987

1,835,184  

$1,088,000 

Double Bayou, TX 
(Maintenance) 

Dredging Double Bayou Channel 

June 6, 1987 to 
March 12, 1987

331,227

$253,418 

Freeport Harbor, TX 
(Maintenance) 

Dredging Outer Bar and Jetty 
Channel 

May 28, 1987 to 
July 23, 1987 

1,241,905

$1,049,913

Dredging Outer Bar Channel 
(Hopper Dredge WHEELER)

September 22, 1987 to 
September 30, 1987 

58,400

$397,662

Galveston Harbor and Channel, 
TX (Maintenance) 

Dredging Bolivar Roads to 
Ferry Landing 

October 1, 1986 to 
October 17, 1986

675,549 

$53,802

Gulf Intracoastal Waterway 
between Apalachee Bay, FL, 
and Mexican Border 
(Galveston District) 
(Maintenance) 

Dredging Channel to Victoria and 
Channel to Seadrift 

October 1, 1986 to 
October 23, 1986 

269,395

$150,395 

Dredging Matagorda Bay to San 
Antonio Bay 

October 1, 1986 to 
January 26, 1987


748,182 

$397,612

Dredging Texas City Junction to 
Galveston Causeway

October 1, 1986 to 
December 25, 1986 

97,008

$485,239 

Dredging Freeport Harbor to Cedar 
Lakes and San Bernard River 
Channel 

October 1, 1986 to 
December 6, 1986 

1,416,978 

$1,073,022 

Dredging Main Channel in 
Matagorda Bay

October 1, 1986 to 
January 1, 1987

40,956

$3,828  

Dredging Cow Bayou to Bastrop 
Bayou 

October 1, 1986 to 
April 27, 1987 

1,370,974

$955,487

Dredging Corpus Christi Bay to 
Mud Flats 

October 6, 1986 to 
December 7, 1986 

1,747,443

$878,700

Dredging Main Channel across 
Aransas Bay 

January 11, 1987 to 
January 28, 1987

797,489

$253,879

Dredging Colorado River to 
Matagorda Bay
 
March 5, 1987 to 
July 11, 1987 

2,171,451

$1,035,672

Emergency Dredging, Main 
Channel in Matagorda Bay 

April 20, 1987 to 
May 18, 1987

183,748 

$331,482

Emergency Dredging, Main 
Channel vicinity of F.M. 457 

May 6, 1987 to 
June 12, 1987 

81,482 

$172,408

Dredging Main Channel, Port Isabel 
to Mile 643 and Tributary Channels 

May 5, 1987 to 
September 19, 1987 

1,784,219

$1,423,890

Dredging High Island to Port 
Bolivar 

August 4, 1987 
September 30, 1987

227,364

$263,520

Emergency Dredging, Brazos 
River Crossing 

September 7, 1987 to 
September 30, 1987

167,319

$150,000

Houston Ship Channel, TX 
(Maintenance) 

Dredging Red Fish Reef to Morgan 
Point and Five Mile Cut 

October 1, 1986 to 
December 26, 1986 

3,619,951

$1,863,794

Dredging Greens Bayou to Sims 
Bayou 

February 8, 1987 to 
August 31, 1987

882,107

$1,572,981



15-39 

GALVESTON, TEXAS DISTRICT 
DREDGING OPERATIONS TABLE 15-H 

Matagorda Ship Channel, TX 
(Maintenance) 

Dredging Matagorda Peninsula to 
Point Comfort 

October 1, 1986 to 
January 1, 1987 

1,534,698

$97,484 

Dredging Channel to Port Lavaca  
and Harbor or Refuge 

January 3, 1987 to January 30, 1987 

929,584 

$277,495 

Sabine-Neches Waterway, TX  
(Maintenance) 

Dredging Port Arthur Canal  

January 12, 1987 to June 23, 1987 

2,025,807 

$1,300,845

Dredging Port Arthur Turning  
Basin and Junction Area 

August 18, 1987 to September 30, 1987 

721,086 

$1,211,000 


Dredging Sabine Pass Outer Bar 
and Sabine Bank Channel 
(Hopper Dredge WHEELER) 

July 11, 1987 to September 21, 1987 

3,972,320 

$3,902,100

Texas Dity Channel, TX 
(Maintenance) 

Dredging Texas City Channel 


April 3, 1987 to May 6, 1987

948,267 

$467,237 
 
Trinity River and Tributaries,  
TX (Maintenance) 

Dredging and snag  and debris removal, Anahuac Channel 
Channel to Liberty 

October 1, 1986 to December 22, 1986

225,482 

$136,199 
 
Emergency Dredging, Channel to 
Liberty 

April 10, 1987 to 
May 20, 1987 

22,736

$67,288 

Emergency Dredging, Anahuac 
Channel 

August 29, 1987 to 
September 30, 1987

147,410

$192,800 
 
 
15-40

FORT WORTH, TX, DISTRICT * 
District includes that portion of Texas south of Red 
River drainage basin exclusive of drainage basin of Rio 
Grande and its tributaries above and including Pecos 
River; exclusive of drainage basins to all short streams 
arising in coastal plain of Texas and flowing into the Gulf 
of Mexico, including entire basins of Buffalo Bayou, San 
Jacinto, San Bernard, Lavaca, Navidad, Mission, and 
Arkansas Rivers; exclusive of lower basins of major 
streams flowing into the gulf as follows: Sabine River, 
Texas and Louisiana, downstream from U.S. Highway 190 
crossing at Bon Wier, Texas; Neches River downstream 
from Town Bluff gaging station; Trinity River 
downstream from Texas State Highway 45 crossing at 
Riverside, Texas; Brazos River downstream from confluence 
with Navasota River; Colorado River downstream 
from gaging station at Austin; Guadalupe River 
downstream from confluence with San Marcos River; San 
Antonio River downstream from confluence with Escondido 
Creek; Nueces River downstream from confluence 
with Frio and Atascosa Rivers; and exclusive of Agua 
Dulce, San Fernando, and Olmos Creek basins draining 
into Baffin Bay; coastal area south thereof to Rio Grande 
and south to the northern boundaries of Newton, Jasper, 
Tyler, Polk, Trinity, Walker, Waller, Austin, Fayette, Gonzales, 
Karnes, Live Oak, Jim Hogg, Zapata; the northern 
and western boundaries of McMullan; and the western 
boundaries of Montgomery and Duval Counties, Texas. 
District also includes those portions of the Sulphur River 
and Cypress Creek Watershed located in the State of 
Texas; that portion of western Louisiana in Sabine River 
drainage basin upstream from U.S. Highway 190 crossing 
at Bon Wier, Texas. 
IMPROVEMENTS 
Navigation Page 
1. Trinity River Project, TX ............... 16-2 
Flood Control 
2. Aquilla Lake, TX ...................... 
3. Bardwell Lake, TX .................... 
4. Belton Lake, TX ....................... 
5. Benbrook Lake, TX ..................... 
6. Boggy Creek, TX ..................... 
7. Canyon Lake, TX ..................... 
8. Cooper Lake and Channels, TX .......... 
9. Elm Fork Floodway, TX ................ 
10. Ferrells Bridge Dam-Lake O'The Pines, TX 
11. Grand Prairie, TX (Landfill) ............ 
12. Grand Prairie, TX (Meyers Road) ......... 
13. Grapevine Lake, TX .................... 
14. Hords Creek Lake, TX ................. 
15. Joe Pool Lake, TX ..................... 
16. Lavon Lake, TX ...................... 
17. Lavon Lake Modification and East Fort 
Channel Improvement, TX ............. 
18. Lewisville Dam, TX .................... 
19. Millican Lake, TX .................... 
20. Navarro Mills Lake, TX ................ 
21. O. C. Fisher Dam and Lake, TX ......... . 
22. Proctor Lake, TX ...................... 
23. Ray Roberts Lake, TX ................. . 
24. San Antonio Channel Improvement, TX ... 
25. San Gabriel River, TX .................. 
26. Somerville Lake, TX ................... 
27. Stillhouse Hollow Dam, TX ............. 
28. Waco Lake, TX ....................... 
16-2 
16-3 
16-3 
16-3 
16-3 
16-4 
16-4 
16-5 
16-5 
16-6 
16-6 
16-6 
16-7 
16-7 
16-7 
16-8 
16-8 
16-8 
16-9 
16-9 
16-9 
16-9 
16-10 
16-10 
16-11 
16-11 
16-11 
Flood Control (cont) Page 
29. Wright Patman Dam and Lake, TX ....... 16-11 
30. Inspection of Completed Flood Control 
Projects ............................. 16-12 
31. Scheduling Flood Control Reservoir 
Operations .......................... 16-12 
32. Other Authorized Flood Control Projects ... 16-12 
33. Flood Control Work Under Special 
Authorization ........................ 16-12 
Multiple-Purpose Projects Including Power 
34. Belton Lake Modification, TX ........... 
35. Dam "A" Lake, TX .................... 
36. Rockland Lake, TX ................... 
37. Sam Rayburn Dam and Reservoir, TX ..... 
38. Tobwn Bluff Dam-B .A. Steinhagen Lake, TX 
39. Town Bluff Hydropower, TX ............. 
40. Whitney Lake, TX .................... 
16-12 
16-12 
16-12 
16-12 
16-13 
16-13 
16-13 
General Investigations 
41. Surveys ............................. 16-13 
42. Collection and Study of Basic Data ....... 16-13 
Tables 
Table 16-A Cost and Financial Statement .... 16-15 
Table 16-B Authorizing Legislation ......... 16-19 
Table 16-C Other Authorized Flood Control 
Projects ..................... . 16-22 
Table 16-D Inspection of Completed Flood 
Control Projects ................ 16-22 
Table 16-E Flood Control Work Under 
Special Authorization ........... 16-23 
16-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. TRINITY RIVER PROJECT, TX 
The project authorized by the River and Harbor Act of 
1965 (H. Doc 276, 89th Cong., 1st Sess.) consists of five major 
components: Multiple-Purpose Channel, Tnnessee Colony 
Lake, Dallas Floodway Extension, West Fork Floodway, 
and Water Conveyance Facilities. For the last full report on 
the project as authorized, see Annual Report of 1978. The 
project information present herein is based on the tentatively 
selected project plan presented in the Draft General 
Design Memorandum. The plan consists of three structural 
components: Dallas Floodway Extension, Tnnessee Colony 
Lake, and Channel to Liberty in the lower basin. The 
estimated cost of the improvements is $1,235,000 including 
$10/,000,000 non-Federal cost for land acquisition and 
relocation required for the local protection features (Oct. 
1, 1987, base price). 
Operations during fiscal year. Preconstruction planning 
continued. 
CHANNEL TO LIBERTY: 
Location. The Channel to Liberty begins at the Houston 
Ship Channel, crosses the bay area in an easterly direction 
to intersect the existing Double Bayou Channel turns northward 
along the coastline to Wallisville Lake and then continues 
northward through the lake area along the course 
of the Trinity River to RM 45 above Liberty, Txas. 
Existing project. The navigation portion of the channel 
will have a width of 200 feet with a depth of 12 feet and will 
extend from the Houston Ship Channel in Galveston Bay 
to the port of Liberty, Thxas. The flood control portion of the 
channel will have a bottom width of 200 feet with a depth 
of 30 feet, and will extend from Wallisville Lake to RM 45 
above Liberty, Txas. Estimated Federal cost of the improvements 
is $147,000,000 and estimated non-Federal cost 
is $44,000,000 for a total estimated cost of $191,000,000 
(Oct. 1, 1987, base price). 
Local cooperation. Local interests are required to: (a) 
provide, without cost to the Federal Government, all lands, 
easements and rights-of-way required for construction, 
operation and maintenance of the project, (b) accomplish, 
without cost to the Federal Government, all relocations and 
alterations to existing improvements, other than highway 
bridges over new land cuts and railroad bridges required 
for the construction of the project, (c) maintain and operate 
the flood control portion of the channel upstream of Liberty, 
Texas, and (d)reimburse the Federal Government for onehalf 
of the separable costs allocated to recreation and fish 
and wildlife enhancement. This reimbursement is presently 
estimated at $34,000, exclusive of interest. 
TENNESSEE COLONY LAKE: 
Location. The Tnnessee Colony dam site is located at 
River Mile 341.7 on the Trinity River about 22 miles west 
of Palestine, Texas. The lake would extend into Freestone, 
Anderson, Henderson, and Navarro Counties, and would 
control a drainage area of 12,302 square miles. 
Existing project. The plan of improvement provides for 
the construction of an earthfilled dam with a maximum 
height of 123 feet above the streambed and a total embankment 
length of 42,350 feet with a gated concrete spillway. 
The lake will have a total controlled storage of 3,455,000 
acre-feet and a water surface area of 114,400 acres at the 
top of the flood control pool and 68,100 acres at the top of 
the conservation pool. The total storage includes 2,269,500 
acre-feet for flood control, 1,040,000 acre-feet for conservation, 
and 145,500 acre-feet for sediment reserve. Estimated 
Federal cost of the improvement is $913,000,000 (Oct. 1, 
1983, base price). 
Local cooperation. Local interests are required to reimburse 
the Federal Government for costs allocated to water 
supply storage and one-half of the separable cost allocated 
to recreation and fish and wildlife enhancement. This reimbursement 
is presently estimated at $461,754,000 for water 
supply and $9,533,000 for recreation (excluding future 
recreation facilities), for a total cost of $471,287,000, exclusive 
of interest. 
DALLAS FLOODWAY EXTENSION: 
Location. Dallas Floodway Extension is located on the 
Trinity River in the City of Dallas, Dallas County, Txas. 
Existing project. The plan of improvement provides for 
extending the existing Floodway downstream about 9 miles 
to the confluence of the Trinity River and Five Mile Creek. 
The plan consists of a leveed floodway and flood conveyance 
improvement (channel) along the main stem, Five Mile 
Creek and White Rock Creek. Maintained free of encroachments, 
the levees and channels would provide Standard 
Project Flood protection for approximately 7,300 acres 
of urban lands currently subject to flooding. The estimated 
Federal cost is $68,000,000 and estimated non-Federal cost 
is $63,000,000 for a total estimated cost of $131,000,000 for 
the improvement (Oct. 1, 1983, base price). 
Local cooperation. Local interests are required to: (a) 
provide, without cost to the Federal Government, all lands, 
easements and rights-of-way necessary for construction, 
maintenance and operation of the project, (b) accomplish, 
without cost to the Federal Government, all alterations to 
existing improvements, other than railroad bridges required 
for the construction of the project, (c) maintain and 
operate the project after completion, and (d)reimburse the 
Federal Government for one-half of the separable costs 
allocated to recreation and fish and wildlife enhancement. 
This reimbursement is presently estimated at $1,878,000 
(excluding future recreation) exclusive of interest. 
Flood Control 
2. AQUILLA LAKE, TX 
Location. On Aquilla Creek in Hill County, Texas, with 
the dam at River Mile 23.3, about 6.8 miles southwest of 
Hillsboro, Teas, and about 24.0 miles north ofWaco,exas. 
16-2

FORT WORTH, TEXAS DISTRICT 
Existing project. For description of completed improvements 
and authorizing Acts see Annual Report for 
1984. Construction was started March 1977, and project 
was ready for beneficial use April 29,1983. Estimated cost 
is $46,100,000. 
Local cooperation. The Water Supply Act of 1958, as 
amended, and the Federal Water Project Recreation Act of 
1965 and Section 221, Flood Control Act of 1970 apply. A 
contract with the Brazos River Authority for water supply 
storage was approved by the Secretary of the Army, June 
29, 1976. To date, the Authority has paid $78,121 toward 
principal and $12,513 to operation and maintenance. 
Benefits accrued to Aquilla project: Accumulated flood 
damages prevented through FY 1987 were $1,234,000. 
Operations during fiscal year. Routine operation and 
maintenance continue. 
3. BARDWELL LAKE, TX 
Location. Dam is on Waxahachie Creek, 5 river miles 
upstream from its confluence with Chambers Creek, a 
tributary of the Trinity River, and about 5 miles south of 
Ennis, Ellis County, Texas. 
Existing project. For a description of completed improvement 
and authorizing act see Annual Report of 1969. Construction 
of project was started August 1963 and completed 
for beneficial use in November 1965. Estimated cost of project 
is $12,941,000. 
Local cooperation. Local interests must reimburse the 
Federal Government for costs allocated to increased water 
supply storage under the terms of the Water Supply Act of 
1958. A Contract was approved by the Secretary of the Army 
on June 24, 1963, and the Trinity River Authority, a 
State agency, agreed to fulfill all requirements of local 
cooperation. lb date the authority has paid $411,999 toward 
principal and $543,403 toward annual cost of operation and 
maintenance of project, including cost of operating 10-foot 
conduit. 
Operations during fiscal yean Routine operation and 
maintenance continued. Recreation facilities under Code 
710 remain. 
Benefits accrued to Bardwell project: Accumulated flood 
damages prevented through FY 1987 were $9,112,700. 
4. BELTON LAKE, TX 
Location. Dam is on Leon River about 16.7 miles above 
confluence of Leon and Lampasas Rivers and about 3 miles 
north of Belton, Texas. 
Existing project. For a description of completed improvement 
and authorizing acts see Annual Report of 1962. Construction 
started June 1949 and project was ready for 
beneficial use in March 1954. Raising water supply pool: 
Construction started in July 1970 and the pool raise is complete. 
Estimated cost of project is $18,410,000. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. A contract with Brazos River Authority, a State 
agency, for remaining water supply storage in reservoir was 
approved by Secretary of the Army on January 15, 1958, 
at an estimated cost of $1,602,822. To date $1,115,617 has 
been paid. Under the contract Brazos River Authority must 
also pay annually 11.2 percent of actual annual cost of 
operation and maintenance. To date $1,059,012 has been 
paid. An interim contract with Brazos River Authority for 
emergency use of water supply storage in project was approved 
by Secretary of the Army on January 2, 1957. 
Amount of $152,435 paid by authority on March 21, 1957 
for use of these facilities was credited to interest and principal 
payable under formal water supply contract. 
Operations during fiscal year. Routine operation and 
maintenance continued. Recreation facilities under Code 
710 remain. 
Benefits accrued to Belton project: Accumulated flood 
damages prevented through FY 1987 were $118,135,500. 
5. BENBROOK LAKE, TX 
Location. Dam is inThrrant County, Texas, on Clear Fork 
of Trinity River 15 river miles upstream from its confluence 
with West Fork of Trinity River about 10 miles southwest 
of downtown Fort Worth, Texas. 
Existing project. For description of completed improvement 
and authorizing acts see Annual Report for 1962. Construction 
of project was started May 1947 and ready for 
beneficial use in September 1952. Estimated cost of project 
is $14,544,000. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. No water supply storage is included in project. In 
1956, Congress passed legislation enabling the city of Fort 
Worth to purchase conservation storage space in Benbrook 
lake. Contracts have been negotiated with the city of Fort 
Worth and the Benbrook Water and Sewer Authority for the 
use of portions of the navigation storage for water supply 
purposes until such storage is required for Trinity River 
Navigation. To date $122,580 has been paid by the city of 
Fort Worth and $106,219 by Benbrook Water and Sewer 
Authority. A cost sharing contract with the city of Benbrook 
for Recreation Development was approved by the Secretary 
of the Army May 20,1977. To date, $18,171 has been paid. 
Operations during fiscal year. Routine operation and 
maintenance continued. Recreation facilities under Code 
710 remain. 
Benefits accrued to system consisting of Benbrook Lake, 
Clear Fork and West Fork Floodways: Accumulated flood 
damages prevented through FY 1987 are estimated at 
$51,449,400. 
6. BOGGY CREEK, AUSTIN, TX 
Location. The project is located on Boggy Creek in 
southeast portion of the city of Austin, Texas. 
Existing project. The recommended plan consists of concrete 
trapezoidal channel on Boggy Creek beginning just 
above Webberville Road and extending downstream about 
2.2 miles to just below Bolm Road. From there, a grass lined 
channel would extend further downstream and transition 
into the natural channel at Ed Bluestein Boulevard, 
a distance of about 1.7 miles. New bridges would be required 
at four street crossings and two railroad crossings. The plan 
calls for acquisition of 54 acres of land adjacent to the lower 
16-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
end of the channel to mitigate habitat losses and also to provide 
for environmental quality enhancement. About 2.25 
miles of trails along the channel and 0.95 miles in the Environmental 
Quality/mitigation area will also be provided. 
Estimated Federal cost is $15,300,000 and $10,600,000 
non-Federal cost (Oct. 1, 1987, base price). 
The proposed flood control channel will provide capacities 
for the 100 year flood. Design will provide for containment 
of flows within the banks of the improved channels. Bottom 
widths for the concrete channel will vary from 60 feet to 90 
feet, and top widths from 80 feet to 120 feet. 
Local cooperation. In accordance with the cost sharing 
and financing concepts reflected in the Water Resources 
Development Act of 1986, the City of Austin is required to 
provide lands, easements, rights-of-way, and material 
disposal areas, presently estimated at $4,708,000; modify 
or relocate buildings, utilities, roads and other facilities except 
railroad bridges, where necessary in the construction 
of the project presently estimated at $4,096,000; pay onehalf 
of the separable costs allocated to recreation, presently 
estimated at $327,000; and bear all costs of operation, 
maintenance, and replacement of recreation facilities, 
presently estimated at $30,000 annually; pay five percent 
of cost allocated to flood control, presently estimated at 
$1,276,000; and bear all cost of operation, maintenance, and 
replacement of flood control facilities presently estimated 
at $42,000 annually; pay 33 percent of the first costs 
allocated to environmental quality enhancement, presently 
estimated at $74,000; pay 37 percent ofthe separable first 
cost allocated to fish and wildlife mitigation, presently 
estimated at $119,000; and bear all costs of operation, 
maintenance, and replacement of fish and wildlife facilities 
presently estimated at $5,000. The city will alsobe required 
to hold and save the United States free from damages due 
to the construction work, operate and maintain all works 
after completion, prevent any obstruction or encroachment 
that would reduce the flow capacity of the project, provide 
and maintain adequate lateral drains and channels, 
publicize flood plain information for all streams in the 
watershed and adopt and enforce regulations to minimize 
damages to future developments within the 100-year flood 
plain, and administer and assure access to the recreational 
facilities and lands to all on an equal basis. 
Operations during fiscal yean A reevaluation of the Interim 
Survey Report was submitted May 5, 1982, and approved 
May 18, 1982. The Phase II General Design 
Memorandum was submitted in January 1984. Specific 
authorization for construction of Boggy Creek is found in 
FY 1985 Supplemental Act. In FY 1987 the Phase Icontract 
was awarded in May 1987. Engineering and Design 
continue. 
7. CANYON LAKE, TX 
Location. Dam is on Guadalupe River, 303 miles above 
its mouth, and about 12 miles northwest of New Braunfels, 
Comal County, Texas. 
Existing project. For a description of completed improvement 
and authorizing act see Annual Report of 1969. Construction 
started April 1958 and project completed for 
beneficial use June 1964. Estimated cost of project is 
$21,732,000, including $1,400,000 contributed by local 
interests. 
Local cooperation. Local interests (Guadalupe-Blanco 
River Authority) will utilize water impounded for water 
supply and streamflow regulation for development of electric 
power. In a formal contract approved by Chief of 
Engineers on October 24,1957, Guadalupe-Blanco River 
Authority agreed to fulfill all requirements of local cooperation. 
Required contribution of $1,400,000 was made in full 
by Guadalupe-Blanco River Authority. The estimated cost 
of the Water Storage contract is about $9,000,000. Tb date 
$1,340,900 has been paid. In addition, $22,848 was contributed 
for installation and operation of reservoir leakage 
gages. Under the contract the authority must pay 34.8 percent 
of actual annual cost of operation and maintenance. 
To date $949,719 has been paid. 
Operations during fiscal yean Regular funds: Routine 
operation and maintenance continued. Recreation facilities 
under Code 710 remain. 
Benefits accrued to Canyon project: Accumulated flood 
damages prevented through FY 1987 were $58,878,300. 
8. COOPER LAKE AND CHANNELS, TX 
Location. Cooper Dam is located in northeast Txas 
about 4 miles southeast of Cooper, 13.0 miles north of 
Sulphur Springs, and is at river mile 23.2 on the South 
Sulphur River. The South Sulphur River rises in Fannin 
County, Txas, and flows generally east for about 80 miles 
to its confluence with the North Sulphur River to form the 
Sulphur River. 
Existing project. The authorized plan of improvement 
consists of a multipurpose reservoir with levee and channel 
improvements on the Sulphur River. The reservoir consists 
of a rolled earthfill dam with a maximum height of 
about 45 feet, 28,070 feet long at its crest, a single conduit 
10.5 feet in diameter, 530 feet long, two 10.5 foot by 4.75 foot 
sluices, and a 700 foot wide uncontrolled concrete spillway. 
The reservoir surface area will be 22,740 acres at the top 
of the flood control pool, 19,305 acres at the top of the water 
supply pool, and 5,084 acres at the top of the sediment pool. 
The reservoir will contain 131,400 acre-feet of flood control 
storage, 273,000 acre-feet of municipal and industrial water 
supply storage, and 37,000 acre-feet of sediment storage. 
Construction of the project began in July 1958 and, to 
date, approximately 55 percent of the lands required for project 
construction have been acquired and 98 percent of the 
levees and 100 percent of the channel work have been completed. 
Approximately 14.8 miles of the South Sulphur 
River and 6.3 miles of the Middle Sulphur River channels 
have been excavated. Approximately 3.4 miles of levee embankment 
on the South Sulphur River and 7.3 miles on the 
Middle Sulphur River have been constructed upstream of 
the Cooper lake. About 10.5 miles of levee on the North 
Sulphur River, 8.2 miles of levee on the Sulphur River, 14 
miles of levee on Cuthand Creek, and 4.2 miles of levee on 
Brushy Creek were strengthened; 0.5 mile of levee on 
16-4

FORT WORTH, TEXAS DISTRICT 
Kickapoo Creek was enlarged; and 15.3 miles of new channel 
in Cuthand Creek, 0.8 mile of new channel in Brushy 
Creek, and 0.2 mile of cutoff channel in Kickapoo Creek 
were excavated; all downstream from Cooper Lake. 
Lack of funds and spending limitations prevented construction 
of the levees and channel work between April 
1964 and February 1971. Construction was started again, 
however, in May 1971. The Texas Committee on Natural 
Resources, et. al., secured an injunction to halt construction 
on the project pending preparation of an Environmental Impact 
Statement (EIS), required by the National Environmental 
Pblicy Act of 1969. A statement was prepared 
and filed on June 24,1977. The plan recommended, in the 
Final EIS, minimized further construction of the authorized 
channels and provided for construction of the lake and 
downstream levees. The sufficiency of the Final EIS was 
challenged in the court and in December 1978 the U.S. 
District Court for the Eastern District of Texas ruled the 
statement inadequate, citing five deficiencies and halting 
all further construction. A Supplemental EIS to comply 
with the court's decision was prepared and filed with the 
Environmental Protection Agency in March 1981. The 
recommended plan of improvement consists of the 
multipurpose lake, 0.9 mile of levee, and the acquisition of 
25,500 acres of wildlife mitigation lands. All remaining 
channel and levee work was deleted from the recommended 
plan. The Supplemental EIS was filed with the court in 
July 1981 and numerous motions, documents, affidavits, 
- and briefs were subsequently filed. Estimated Federal cost 
(Oct. 1,1987 base price) is $130,000,000, non-Federal cost 
for land for the levees is $227,000 and in addition 
$51,600,000 is to be reimbursed by water supply users over 
a 50-year period. The project was transferred to the Fort 
Worth District at the end of FY 1979. 
Local cooperation. Except for Cooper Lake, local interest 
must furnish lands and rights-of-way and alter and 
relocate highways and related facilities and utilities, except 
railroads, for construction; hold and save the United States 
free from damages; maintain and operate all works after 
completion, and preserve channel capacities by preventing 
encroachment. Local agencies furnished rights-of-way for 
the first two phases of work on the levees and channel 
downstream from Cooper Dam. Rights-of-way acquisition 
for the second phase was also essentially complete when 
construction was halted. 
Assuring agencies are the following counties in Txas: 
Delta, Hunt, Franklin, Lamar, Morris, Hopkins, Titus, and 
Red River. Basic assurances have been received. Supplemental 
assurances covering Public Law 91-646 have not 
been received from Delta, Lamar, Morris, or Hunt Counties 
Operations during fiscal yean After the Supplemental 
EIS was filed in July 1981, numerous motions, 
documents, affidavits, and briefs were filed through October 
1982. On December 30, 1982, the U.S. District Court issued 
a 95-page order continuing the permanent injunction. On 
March 22,1983, the order was revised and Judge William 
Wayne Justice issued an Amended Memorandum Opinion 
and a Permanent Injunction against the construction of 
Cooper Lake. The Government filed a Notice of Appeal with 
the court in May 1983. Since that time, several briefs have 
been filed with the New Orleans Fifth Circuit Court of Appeals. 
Current action centers on the Appeal and resolution 
of the litigation. On July 16,1984, litigation was resolved 
and the injunction was released. Contracts awarded during 
FY 1987 include the following: Initial Embankment and 
Diversion Channel, awarded December 1986; Relocation of 
United Telephone, awarded May 1987; Relocation of Delta 
County Road, awarded May 1987; Embankment, Spillway 
and Outlet Works, South Access Extension and Stilling 
Basin, and Levee Downstream were awarded July 1987; 
Relocation of Farmers Electric Coop, awarded August 1987; 
and Relocation of Hopkins County Road, awarded 
September 1987. Through FY 1987 the following is approximately 
complete: Levees and Channels, 98 percent; Real 
Estate, 55 percent; Embankments, Spillway and Outlets, 
0 percent. Land Acquisition and Engineering and Design 
continues. 
9. ELM FORK FLOODWAY, TX 
Location. The project is located in Dallas and Denton 
Counties, Txas. A portion of the improvement will be in 
and adjacent to the Cities of Dallas, Irving and Farmers 
Branch, Txas. 
Existing project. Improvement of the Elm Fork of the 
Trinity River from the mouth to Lewisville Dam and along 
Denton Creek, a tributary of the Elm Fork to Grapevine 
Dam. The plan of improvement provides for enlargement 
and realignment of about 22 miles of the Elm Fork, enlargement 
and realignment of about 20 miles of tributary channels, 
construction of about 39 miles of new levee, rehabilitation 
of about 2 miles of existing levees, modification of 14 
street and highway bridges, 4 railroad bridges and alteration 
of utilities. Estimated Federal cost of these modifications 
is $60,700,000, and non-Federal estimated cost is 
$88,600,000, a total of $149,300,000 (Oct 1, 1983, base 
price). 
Local cooperation. Local interests are required to provide, 
without cost to the Federal Government, except for the 
main channel thereof, all lands, easements, utilities and 
bridge relocations ,except railroad bridges, necessary for 
construction and operation of the project. Assurances were 
signed March 20, 1969 by the Trinity River Authority, a 
State agency, that they would provide items required of 
local interests. 
Operations during fiscal yean Preconstruction planning 
was suspended in 1973. Further Studies have been 
delayed until a definite plan has been accepted by local 
interests. 
10. FERRELLS BRIDGE DAMLAKE 
O' THE PINES, TX 
Location. Dam is on Cypress Creek in Marion, Harrison, 
Upshur, Morris, Camp, and Titus Counties, Texas, 8 miles 
west of Jefferson, Texas. 
Existing project. An earth-fill dam 10,600 feet long and 
77 feet high includes a 200-foot spillway with a capacity of 
16-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
68,200 cubic feet per second. Reservoir controls runoff from 
850 square miles of drainage area, and has a gross storage 
capacity of 842,100 acre-feet, including 587,200 acre-feet 
flood control storage, 3,800 acre-feet conservation storage, 
and 251,100 acre-feet for municipal and industrial water 
supply. Reservoir extends 28 miles upstream. Project affords 
substantial flood protection of Cypress Creek Valley 
from damsite to confluence with Red River and, together 
with operation of other reservoirs proposed in Red River 
Basin, will provide flood protection along main stem of Red 
River below Denison Dam. Construction commenced in 
January 1955 and was completed in June 1960. Estimated 
Federal cost of project is $17,231,700 (Oct. 1, 1983, base 
price), including $4,349,200 for Code 711 and $399,739 accelerated 
Public Works fund. This project transferred to the 
Fort Worth District as of the end of FY 1979. 
Local cooperation. None required. 
Operations during fiscal yean Routine operation and 
maintenance continued. Recreation facilities under Code 
710 remain. 
Benefits accrued to Ferrells Bridge Dam-Lake O' The 
Pines project: Accumulated flood damages prevented 
through FY 1987 were $6,139,000. 
11. GRAND PRAIRIE, TX, 
SANITARY LANDFILL 
Location. The project is located at a bend of the West Fork 
of the Trinity River, bxas, approximately 19,500 feet 
upstream of the confluence of the West Fork and Elm Fork 
of the Trinity River. This bend in the river is adjacent and 
north of the city of Grand Prairie sanitary landfill which 
lies within Dallas County and is located in northeast Grand 
Prairie. 
Existing project. For description of completed improvements 
and authorizing acts see Annual Report for 
1985. Construction was started September 1983 and completed 
in 1985. The total Federal and non-Federal cost of 
the project is $595,000. 
Local cooperation. In accordance with Section 14 of the 
Flood Control Act of 1946 as amended, the city of Grand 
Prairie is required to assume full responsibility for all project 
costs in excess of the Federal cost limitation of $250,000. 
In addition, the city is required to provide without cost to 
the United States all lands, easements, and rights-of-way 
necessary for construction and maintenance; bear the cost 
of all alteration and relocations of utilities, storm drains, 
roads, highway bridges, and community services; hold and 
save the United States free from damages due to construction 
work; operate and maintain all works after completion 
and prevent any obstruction or encroachment that would 
reduce the flow capacity of the project; publicize and notify 
all interested parties that the project will not provide protection 
from the occurrence of storms greater than the project 
design flood; comply with Public Law 91-646, approved 
January 2, 1971, and with the requirements of Section 
221, Public Law 91-611, approved December 31, 1970, as 
amended. 
12. GRAND PRAIRIE, TX, STREAMBANK 
EROSION AT MEYERS ROAD 
Location. The project is located at a bend of the West Fork 
of the Trinity River approximately 6.1 miles upstream of 
the confluence of the West Fork and Elm Fork of the Trinity 
River. This bend in the river is adjacent to Meyers Road 
which lies within Dallas County and is located in northeast 
Grand Prairie. More specifically Meyers Road is north oflInterstate 
Highway 30 and west of the city's sanitary landfill. 
Existing project. For description of completed improvements 
and authorizing acts see Annual Report for 
1985. Construction was started in January 1984 and completed 
in 1985. The total Federal and non-Federal estimated 
cost of the project is $300,000. 
Local cooperation. In accordance with Section 14 of the 
Flood Control Act of 1946 as amended, the city of Grand 
Prairie is required to assume full responsibility for all project 
costs in excess of the Federal cost limitation of $250,000. 
In addition, the city is required to provide without cost to 
the United States all lands, easements, and rights-of-way 
necessary for construction and maintenance; bear the cost 
of all alteration and relocations of utilities, storm drains, 
roads, highway bridges, and community services; hold and 
save the United States free from damages due to construction 
work; operate and maintain all works after completion 
and prevent any obstruction or encroachment that would 
reduce the flow capacity of the project; publicize and notify 
all interested parties that the project will not provide protection 
from the occurrence of storms greater than the project 
design flood; comply with Public Law 91-646, approved 
January 2,1971, and with the requirements of Section 
221, Public Law 91-611, approved December 31, 1970, as 
amended. 
13. GRAPEVINE LAKE, TX 
Location. Dam is in Tarrant County, Txas, on Denton 
Creek, 11.7 river miles upstream from its confluence with 
Elm Fork of Trinity River and about 20 miles northwest of 
City of Dallas, Txas. 
Existing project. For description of completed improvement 
and authorizing act, see Annual Report for 1962. Construction 
of project was started December 1947 and ready 
for beneficial use in July 1952. Estimated cost of project is 
$18,896,000, including $2,040,000 contributed by local 
interests. 
Local cooperation. A contract with Dallas County Park 
Cities Water Control and Improvement District No. 2 for 
50,000 acre-feet of water supply storage was approved by 
Secretary of the Army on March 21,1955. Park Cities paid 
the required $607,000. A contract with City of Dallas for 
85,000 acre-feet of water supply storage was approved by 
Secretary of the Army on March 17,1954. Dallas paid the 
required $1,433,026. A contract with City of Grapevine, 
Texas, for 1,250 acre-feet of water supply storage was approved 
by Secretary of the Army on September 14,1953, at 
an estimated cost of $22,654. A contract for Interim Use of 
Navigation Storage with city of Grapevine was approved 
16-6

FORT WORTH, TEXAS DISTRICT 
by Secretary of the Army on February 27, 1981, at an 
estimated cost of $684,000. To date, $62,228 has been paid. 
Above contracts include payment of operation and 
maintenance costs as follows: Dallas County Park Cities 
Water Control and Improvement District No. 2, a pro rata 
part of the actual annual cost, which part is to be not less 
than $2,000 nor more than $3,000; Dallas, 9.2 percent of 
actual annual cost; and Grapevine, its pro rata part of actual 
annual cost (estimated at $79.55 annually and included 
in total annual payment). Following operation and 
maintenance payments have been made: Park Cities 
$103,231, Dallas $482,169, and Grapevine $98,237. 
Operations during fiscal yean A contract for modification 
of Embankment and Spillway was awarded September 
30,1983 and continues. The proposed plan of improvement 
provides for spillway modification by construction of 
spillway chute and stilling basin and a berm on the 
downstream side of the main embankment and completion 
in FY 1987. Recreation facilities under Code 710 remain. 
Benefits accrued to system comprised of Lewisville Lake, 
Grapevine Lake and Dallas Floodway: Accumulated flood 
damages prevented through FY 1987 were $942,720,300. 
14. HORDS CREEK LAKE, TX 
Location. On Hords Creek, a tributary of Pecan Bayou, 
about 13.5 miles west of Coleman, Toxas, and about 27.8 
miles upstream from mouth of Hords Creek. 
Existing project. For description of completed improvement 
and authorizing acts see Annual Reportfor 1962. Construction 
of project was started January 1947 and completed 
for beneficial use in April 1948. Estimated cost ofproject 
is $4,337,000 including $105,000 contributed by local 
interests. 
Local cooperation. Fully complied with. 
Operations during fiscal yean Routine operation and 
maintenance continued. Recreation facilities under Code 
710 remain. 
Benefits accrued to Hords Creek project: Accumulated 
flood damages prevented through FY 1987 were $937,200. 
15. JOE POOL LAKE, TX 
Location. Dam site is located at River Mile 11.2 on 
Mountain Creek, a right bank tributary of the West Fork 
of the Trinity River, and is adjacent to the city limits of 
Grand Prairie, Dallas County, Txas, which is one of the 
rapid growing cities in the Dallas-Fort Worth Metropolitan 
area. 
Existing project. The project provides for construction 
of an earthfill dam with a maximum height of 108.5 feet 
above the streambed and a total length of 24,200 feet, including 
50-foot uncontrolled ogee type spillway, which will 
control 232 square miles of drainage area. The reservoir 
will have a total controlled storage of 304,000 acre-feet and 
a water surface area of 10,940 acres at the top of the flood 
control pool and 7,470 acres at the top of the conservation 
pool. The total storage includes 123,100 acre-feet for flood 
control, 142,900 acre-feet for conservation and 38,000 acrefeet 
for sediment reserve. Estimated cost of the project is 
$193,000,000 (Oct. 1,1987, base price) including $9,500,000 
non-Federal first cost. Project is a unit in the general comprehensive 
plan for development and control of the water 
resources of the Trinity River basin. 
Local cooperation. The Water Supply Act of 1958 as 
amended, and the Federal Water Project Recreation Act of 
1965 apply. Contracts for water supply storage and recreation 
with the Trinity River Authority were approved by the 
Acting Secretary of the Army, June 15, 1977. The recreation 
contract with Trinity Valley Authority was modified 
March 28,1979, to allow the Corps to participate with the 
State of Tbxas and approved by the Assistant Secretary of 
the Army March 21,1980. Recreation development contract 
with the State of Texas was approved by the Assistant 
Secretary of the Army March 21,1980. Reimbursement is 
currently estimated at $47,150,000 for water supply and 
$8,850,000 for recreation (excluding future recreation 
facilities) for a total of $56,000,000 exclusive of interest. 
Operations during fiscal yean The project has been 
under construction since FY 1975 and through FY 1986 is 
approximately 89 percent complete overall. Contracts 
awarded during FY 1987 include the following: Recreation 
Facilities, Part 3, Lynn Creek Park, awarded April 1987; 
Visitor Overlook and Toilet, awarded September 1987; 
Recreation Facilities, Part I, awarded September 1987; and 
Recreation Facilities, Loyd and Britton Park, awarded 
September 1987. Land Acquisition and Engineering and 
Design continue. Public Law 97-400, H.R. 7377, 97th Congress, 
effective December 31, 1982, changed the name of 
Lakeview Lake to Joe Pool Lake. Benefits accrued to Joe 
Pool Lake project: Accumulated flood damages prevented 
through FY 1987 were $1,764,800. 
16. LAVON LAKE, TX 
Location. Dam is in Collin County, Txas, on East Fork 
of Trinity River 55.9 miles above its confluence with Trinity 
River and about 22 miles northeast of Dallas, Txas. 
Existing project. For description of completed improvement 
and authorizing acts see Annual Report for 1962. Construction 
of project was started January 1948 and ready for 
beneficial use in September 1953. Project is complete. See 
following section for Lavon Lake Modification and East 
Fork Channel Improvement authorized by Flood Control 
Act of 1962. Estimated cost of project is $15,470,000. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. A contract with North Texas Municipal Water 
District for water supply storage, including cost of intake 
structure, was approved by Secretary of the Army July 8, 
1954, at an estimated cost of $1,405,753. Contract was 
revised in 1973 and final revised contract amount is 
$1,445,261.67. To date the district has paid $682,768. 
Under the contract North Texas Municipal Water District 
must pay annually 13.6 percent of actual annual cost of 
operation and maintenance. To date the district has paid 
$584,654. 
Operations during fiscal yean Routine operation and 
maintenance continued. 
16-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Benefits accrued to Lavon project: Accumulated flood 
damages preyented through FY 1987 were $91,035,100. 
17. LAVON LAKE MODIFICATION 
AND EAST FORK CHANNEL 
IMPROVEMENT, TX 
Location. Existing dam is in Collin County, Texas, on 
East Fork of Trinity River, 55.9 miles above its confluence 
with Trinity River and about 22.0 miles northeast of Dallas, 
Txas. Channel improvement of East Fork extends from its 
mouth to River Mile 31.8. 
Existing project. Reservoir modification provides for 
raising top of existing dam from elevation 502.0 to 514.0 
and lengthening existing dam from about 9,499 feet to 
about 19,493 feet; modification ofexisting concrete spillway 
structure; enlargement of existing reservoir area, involving 
acquisition of additional rights-of-way; relocation and 
alteration of highways, county roads, railroads and utilities; 
and provision of recreational facilities. East Fork Channel 
and floodway improvements consist of 25 miles of channel 
enlargement and straightening of the East Fork between 
River Mile 0.0 and 31.8; replacement of inadequate leveesluice 
structures; rehabilitation of existing levees; acquisition 
and clearing of land areas as required for rights-of-way 
along improved channel and existing levees; alteration of 
existing railroad, highway and county road bridges crossing 
the improved channel as well as relocation of existing 
utility lines; and strengthening and raising about 202,400 
linear feet of levees of seven existing levee districts. Reservoir 
will provide a total storage capacity of 748,200 acrefeet 
(275,600 are for flood control, 380,000 for water supply 
storage, and 92,600 for sedimentation reserve). 
Estimated Federal cost of the modification and improvement 
is $69,750,000 and estimated cost to local interests 
is $220,000 for lands and damages and relocations, a total 
of $69,970,000. Construction was initiated in May 1970 and 
ready for beneficial use in December 1975. 
Local cooperation. Local interests must reimburse the 
Federal Government for costs allocated to increased water 
supply storage under the terms of the Water Supply Act of 
1958. The North Txas Municipal Water District has contracted 
for 43 percent of the water supply (approved 
September 22,1967, by the Secretary of the Army) and to 
date $2,804,064 has been paid. North Trxas Municipal 
Water Supply District has submitted assurance to contract 
for 57 percent of future water supply. Reimbursement is currently 
estimated at $37,787,324. 
Levee Districts 4 and 5, which comprise the lower 10 miles 
of the East Fork Channel, entered into agreements as required 
by Section 221 of the Flood Control Act of 1970 on 
January 28, 1972 and have furnished all necessary construction 
easements. 
Levee Districts 6, 8, 10, 13, and 15, which comprise the 
upper 15 miles of the East Fork Channel, have declined to 
provide the necessary assurances. On December 8, 1972, 
this portion of the project was reclassified from "active" to 
"inactive" category. 
Operations during fiscal yean A construction contract 
for Levee Improvement, Increment I, East Fork was awarded 
May 1, 1981, and continues. Improvement of the lower 
ten miles of the East Fork Channel and Levees and total 
project are 99 percent complete. 
18. LEWISVILLE DAM, TX 
Location. Dam is in Denton County, Txas, on Elm Fork 
of Trinity River 30 river miles above its confluence with 
Trinity River and about 22 miles northwest of City of 
Dallas, Tbxas at a site downstream from old Garza Dam. 
Existing project. For description of completed improvement 
and authorizing acts see Annual Report for 1962. Construction 
of project was started November 1948 and ready 
for beneficial use in November 1954. Estimated cost of project 
is $25,902,000, including $3,677,000 contributed by 
local interests. 
Local cooperation. A contract with City of Dallas for 
415,000 acre-feet of water supply storage land rights and 
interests to Garza Dam and Reservoir was approved by the 
Secretary of the Army on July 16,1953. Local contributions 
have been made in full. A contract with city of Denton, 
Texas, for remaining 21,000 acre-feet of water supply 
storage was approved by the Secretary of the Army on May 
20, 1954, with an estimated cost of $250,064. Local contributions 
have been paid in full. Under above contracts, 
cities of Dallas and Denton must pay annually 21.9 and 1 
percent, respectively, of actual annual cost of operation and 
maintenance. To date Dallas has paid $3,000,210 and Denton 
$128,132. 
Operations during fiscal year. Routine operation and 
maintenance continued. Recreation facilities under Code 
710 remain. 
Benefits accrued to system comprised ofLewisville Lake, 
Grapevine Lake, and Dallas Floodway: Accumulated flood 
damages prevented through FY 1986 were $879,242,900. 
19. MILLICAN LAKE, TX 
Location. Dam is on the Navasota River at mile 24.1, approximately 
7.0 miles north of Navasota, Txas in Grimes 
and Brazos Counties, Toxas. This project would be the first 
of a two-stage development consisting of Millican and 
Navasota Dams, both of which would be units in the overall 
plan of improvement for the Brazos River Basin. 
Existing Project. The project provides for construction 
of a concrete and earthfill dam 25,300 feet long including 
a 472-foot gate-controlled spillway, rising 83 feet above the 
streambed. Without Navasota Lake in operation, the top 
of flood control pool (elevation 234.0) would provide 
1,557,400 acre-feet of storage space and cover a surface area 
of 66,000 acres. There would be 784,800 acre-feet of flood 
control; 680,200 acre-feet for water supply (surface area 
42,400 acres), and 92,400 acre-feet for sediment reserve. 
With Navasota Lake in operation, the top of flood control 
elevation and total storage would remain the same. The 
flood control pool would be 359,600 acre-feet, water supply 
storage would be 1,125,800 acre-feet (surface area 55,500 
acres) and sediment reserve would be 72,000 acre-feet. 
Estimated Federal cost of the project is $108,000,000 
16-8

FORT WORTH, TEXAS DISTRICT 
(Oct. 1,1987 base price)and $273,000,000 non-federal first 
cost for a total project cost of $381,000,000. 
Local cooperation. The Water Supply Act of 1958 as 
amended and the Federal Water Project Recreation Act of 
1965 applies. By letter dated December 9, 1974, the Brazos 
River Authority stated that they would be the state agency 
to cost share for both water supply and recreation. 
Operations during fiscal yeas Preconstructionplanning 
continued. 
20. NAVARRO MILLS LAKE, TX 
Location. Dam is in Navarro County, Texas, at River Mile 
63.9 on Richland Creek, a tributary of Trinity River, about 
16.0 miles southwest of Corsicana, 'Tbxas. 
Existing project. For description of completed improvement 
and authorization acts see Annual Report for 1965. 
Construction started December 1959 and project completed 
for beneficial use March 1963. Estimated cost of project is 
$13,154,000, including $300,000 contributed by local 
interests. 
Local cooperation. The Water Supply Act of 1958, as 
amended applies. A formal contract with the Trinity River 
Authority was approved March 3,1966, by the Secretary of 
the Army at an estimated cost of $2,260,800. lb date the 
Authority has paid $721,755 for water supply and $803,971 
for operation and maintenance. 
Operations during fiscal yean Routine operation and 
maintenance continued. Recreation facilities under Code 
710 remain. 
Benefits accrued to Navarro Mills project: Accumulated 
flood damages prevented through FY 1987 were 
$27,732,000. 
21. O. C. FISHER DAM AND LAKE, TX 
Location. Dam is on North Concho River, a tributary of 
Concho River, about 6.6 miles above mouth of North Concho 
River near city of San Angelo, Tbxas. 
Existingproject. For description of completed improvement 
and authorizing acts see Annual Report for 1962. 
Name was changed from San Angelo Dam and Reservoir to 
O.C. Fisher Dam and Lake January 3,1975 by Public Law 
93-634. Construction of project was started May 1947 and 
ready for beneficial use February 1952. Estimated cost of 
project is $17,111,000. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies A water-supply contract with Upper Colorado River 
Authority for water-supply storage in reservoir was approved 
by Secretary of the Army on October 11, 1948. The 
Authority has contributed $860,444 toward cost of project 
and $64,324towardoperationandmaintenancefor a50-year 
period. The Authority mustpay additional considerationof 
$1ayearforuseful life ofproject,beginningJanuary 1,1965. 
Operations during fiscal yean Routine operation and 
maintenance continued. Recreation facilities under Code 
710 remain. 
Benefits accrued to O. C. Fisher Dam and Lake project: AccumulatedflooddamagespreventedthroughFY 
1987 were 
$2,375,600. 
22. PROCTOR LAKE, TX 
Location. Dam is at River Mile 238.9 on Leon River, a 
tributary of Brazos River, about 8.0 miles northeast of Comanche 
in Comanche County, Toxas. 
Existing project. For description of completed improvement 
and authoriation act see Annual Report of 1969. Construction 
of project was started July 1960 and completed 
for beneficial use 1963. Estimated cost of project is 
$16,249,000. 
Local cooperation. The Water Supply Act of 1958 applies. 
A formal contract with the Brazos River Authority, 
a State agency, was approved by Secretary of the Army, July 
1,1960, and was modified and approved May 9,1966, at 
an estimated cost of $1,707,900. To date the Authority has 
paid $315,943 for water supply and $304,764 for operation 
and maintenance. 
Operations during fiscal year. Routine operation and 
maintenance were continued. Recreation facilities under 
Code 710 remain. 
Benefits accrued to Proctor project: Accumulated flood 
damages prevented through FY 1987 were $7,721,400. 
23. RAY ROBERTS LAKE, TX 
Location. Damsite is located at River Mile 60.0 on the 
Elm Fork of the Trinity River, Denton County, between 
Sanger and Aubrey, Txas and 30 miles upstream from 
Lewisville Dam. 
Existing project. The plan of improvement provides for 
construction of an earthfilled dam with a maximum height 
of 141 feet above the streambed, a length of 15,250 feet including 
an uncontrolled broadcrested spillway 100 feet 
long, controlling 682 square miles of drainage area. The 
lake will have a total controlled storage of 1,064,600 acrefeet. 
with a water surface area of 36,900 acres. The total 
storage includes 260,800 acre-feet for flood control, 749,200 
acre-feet for water supply, and 54,600 acre-feet for sediment 
reserve. Estimated Federal cost of the project is 
$292,000,000 (Oct. 1,1987, base price). Public Law 96-384, 
96th Congress, H.R. 8094, effective January 4,1981, changed 
the name of Aubrey Lake to Ray Roberts Lake. 
Local cooperation. The Water Supply Act of 1958 as 
amended and the Federal Water Project Recreation Act of 
1965 and Section 221, Flood Control Act of 1970 apply. Contracts 
with the cities of Dallas and Denton, Texas, for water 
supply storage and recreation were approved by the 
Secretary of the Army September 16, 1980. 
Operations during fiscal yean The project is about 80 
percent complete overall. Acquisition of real estate continues 
FY 1987 funds were used to award the following contracts: 
FM Road 423, Lewisville, awarded October 1986; 
Southwestern Bell Telephone FM 423, awarded October 
1986; Denton County Electric, awarded October 1986; Central 
Telephone, awarded March 1987; Alternate Recreation 
Facilities Part I, Lewisville, awarded August 1987; Clearing 
Part II, awarded October 1986; Lewisville Clearing, 
awarded September 1987; Boundary Delination Part IV, 
awarded August 1987; Plug Oil Wells, awarded June 1987; 
16-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Recreation Facilities Part I, Initial Facility, awarded March 
1987; and North Texas State University Mitigation, awarded 
September 1986. Deliberate Impoundment was June 30, 
1987. At the request of the City of Denton and the approval 
of the Secretary of the Army, the penstock was added to the 
embankment as a minimum facility for future hydropower. 
Engineering and design continue. 
24. SAN ANTONIO CHANNEL 
IMPROVEMENT, TX 
Location. Floodway is in city of San Antonio, Bexar 
County, Texas, on San Antonio River and San Pedro, 
Apache, Alazan, Martinez Creeks, and Espada Aqueduct 
located in vicinity of Six Mile Creek. 
Existing project. Provides for clearing, widening, 
deepening, and straightening about 34.9 miles of river and 
creek channels to carry standard project flood discharges, 
construction of channel walls, paving, conduit, and construction 
and alteration of railroad bridges. Estimated 
Federal cost of these modifications is $114,000,000 (Oct. 1, 
1987, base price), and estimated cost to local interests is 
$75,100,000 which includes $3,000,000 cash contributions 
and $72,100,000 for lands, damages, and construction, a 
total of $191,100,000. Existing project was authorized by 
1954 Flood Control Act. The Water Resources Act of 1976 
added authorization to the existing project for construction 
of flood control measures needed to preserve and protect the 
Espada Aqueduct located in the vicinity of Six Mile Creek. 
Construction was started in October 1957 and the project 
is about 83 percent complete. 
Local cooperation. Local interests must furnish lands 
and rights-of-way for construction, including purchase and 
removal of buildings, relocation or reconstruction of bridges 
(exclusive of railway bridges), channel dams where applicable, 
and utility lines; hold the United States free from 
damages; maintain and operate all works after completion; 
and provide a cash contribution for enhancement benefits 
of 2.65 percent of actual Federal construction cost. San Antonio 
River Authority furnished assurances that it will comply 
with all requirements of local cooperation. These 
assurances were acceptedby the District Engineer on April 
15,1957. b date $999,525 has been contributed by San Antonio 
River Authority. In addition, $30,000 has been contributed 
and accepted, under the authority of Civil Functions 
Appropriations Act of 1958, for vehicular crossings 
over the San Antonio channel. 
Operations during fiscal yean FY 1987 funds were used 
to award the following contracts: Phase II Inlet, Unit 
7-3-1, awarded September 1986, and Phase II Tunnels- 
Three Units, awarded September 1987. Engineering and 
design studies continued. 
Benefits accrued to San Antonio project: Accumulated 
damages prevented through FY 1987 were $117,514,900. 
25. SAN GABRIEL RIVER, TX 
Location. Project is a system of three reservoirs in 
Williamson County in the central portion of Brazos River 
Basin, which consists of Granger Dam at River Mile 31.9 
on San Gabriel River, about 7.0 miles east of Granger, 
Texas; North San Gabriel Dam at River Mile 4.3 on North 
Fork of San Gabriel River, about 3.5 miles northwest of 
Georgetown, Texas; and South Fork Dam at River Mile 4.7 
on South Fork of San Gabriel River, about 3.0 miles 
southwest of Georgetown, Texas. 
Existing project. Granger Lake was authorized by 1954 
Flood Control Act, and North (North San GabrielDam and 
Lake Georgetown) and South Fork Lakes were authorized 
by 1962 Flood Control Act. Estimated total Federal cost of 
project is $181,400,000 (Oct. 1, 1986, base price),and 
estimated non-Federal cost of $90,600,000 for a project total 
of $272,000,000. Plan of improvement provides for the 
following: Granger: An earthfilled dam 16,320 feet lon& including 
spillway with maximum height of 115 feet above 
streambed, which controls 709 square miles of drainage 
area. Reservoir provides a total storage capacity of 244,200 
acre-feet, of which 162,200 acre-feet are for flood control, 
37,900 acre-feet for water supply storage, and 44,100 acrefeet 
for sediment reserve. Estimated cost of project is 
$62,062,000. North San Gabriel Dam: A rockfill dam 6,700 
feet long, including spillway with maximum height of 164 
feet above streambed, which controls 246 square miles of 
drainage area. Reservoir provides a total storage capacity 
of 130,800 acre-feet of which 87,600 acre-feet are for flood 
control, 29,200 acre-feet for water supply storage, and 
14,000 acre-feet for sediment reserve. Estimated cost of project 
is $38,765,000. South Fork: A rockfill dam 5,620 feet 
long, including spillway with maximum height of 152 feet 
above streambed, which controls 123 square miles of 
drainage area. Reservoir provides a total storage capacity 
of 82,600 acre-feet (45,700 for flood control, 28,900 for water 
supply storage, and 8,000 for sediment reserve). Estimated 
cost of project is $171,173,000. Public Law 96-575, 96th Congress, 
H.R. 4941 effective January 4, 1981, changed the 
name of North Fork Lake to North San Gabriel Dam and 
Lake Georgetown. 
Local cooperation. Construction is subject to condition 
that local interests reimburse the Federal Government for 
costs allocated to water supply at Granger, Lake 
Georgetown, and South Fork Lakes. Reimbursement currently 
estimated at $13,315,000 for Granger, $6,295,000 for 
Lake Georgetown, and $50,563,000 for South Fork, for a 
total of $70,172,000 exclusive of interest. Brazos River 
Authority, a State agency, is the local interests' sponsor of 
project, and by letter dated April 18,1966, indicated its acceptance 
of the proposed plan of development and its willingness 
to pay for the costs allocated to water supply in each 
reservoir in the ultimate plan. Such water supply 
assurances for Granger and Lake Georgetown Lakes were 
approved May 24,1968 as satisfactory in accordance with 
requirements of the Water Supply Act of 1958, as amended. 
Contract negotiations for South Fork Lake will be deferred 
until the need for water supply develops and the reservoir 
is scheduled for construction. 
Operations during fiscal yean Through 1983 all work 
has been completed. Deliberate impoundment of water 
commenced at Granger and Lake Georgetown Lakes on 
16-10

FORT WORTH, TEXAS DISTRICT 
January 21, 1980 and March 3, 1980, respectively. In FY 
1982, studies on South Fork Lake were resumed inpreparation 
of General Design Memorandum to provide reaffirmation 
prior to construction. This reaffirmation is currently 
scheduled for submission in October 1986 and to be fully 
coordinated by February 1987. 
Benefits accrued to project consisting of Granger and 
Lake Georgetown: Accumulated flood damages prevented 
through FY 1987 were $19,022,200. 
26. SOMERVILLE LAKE, TX 
Location. Dam is on Yegua Creek 20 miles upstream 
from its confluence with Brazos River and about 2 miles 
south of Somerville, Texas. 
Existing project. For description of completed improvements 
and authorizing act see Annual Report of 1969. 
Construction started in June 1962 and project was ready 
for beneficial use in January 1967. Estimated cost of project 
is $30,227,000. 
Local cooperation. The Water Supply Act of 1958, as 
amended, applies. A contract with the Brazos River 
Authority, a State agency, for water supply storage approved 
May 10, 1962, by the Secretary of the Army, to date, 
$989,147 has been paid. Also under the contract, the 
authority must pay annually 28.655 percent of the actual 
annual cost of operation and maintenance. 
Operations during fiscal yean Routine operation and 
maintenance continued. Recreation facilities under Code 
710 remain. 
Benefits accrued to Somerville project: Accumulated flood 
damages prevented through FY 1987 were $32,194,000. 
27. STILLHOUSE HOLLOW DAM, TX 
Location. Dam is on Lampasas River 16 miles upstream 
from its confluence with Little River, a tributary of the 
Brazos River, and about 5 miles southwest of Belton, Texas. 
Existing project. For description of completed improvements 
and authorizing act see Annual Report of 1969. 
Construction was initiated in July 1962 and the project was 
ready for beneficial use in February 1968. Estimated cost 
of project is $23,670,000. 
Local cooperation. The Water Supply Act of 1958 applies. 
A contract with the Brazos River Authority, a State 
agency, for water supply storage was approved April 13, 
1962, by the Secretary of the Army, at an estimated cost of 
$6,912,430. To date the Authority has paid $1,254,854. Also 
under the contract the Authority must pay annually 27.748 
percent of the actual annual cost of operation and 
maintenance. To date the Authority has paid $601,477. 
Operations during fiscal yean Routine operation and 
maintenance continued. Recreation facilities under Code 
710 remain. 
Benefits accrued to Stillhouse Hollow Project: Accumulated 
estimate of flood damages prevented through 
FY 1987 is $25,306,200. 
28. WACO LAKE, TX 
its confluence with Brazos River, at City of Waco, McLennan 
County. Texas. 
Existing project. For description of completed improvements 
and authorizing act see Annual Report of 1969. 
Estimated cost of project is $50,853,000 including $250,000 
contributed by local interests and $2,500,000 other non- 
Federal cost. Construction was started in July 1958, and 
project was ready for beneficial use in February 1965. 
Local cooperation. Section G of the Flood Control Act 
of December 1944 applies. A contract with the Brazos River 
Authority, a State agency, for water supply storage and the 
contract with the City of Waco transferring the existing 
Lake Waco to the Government for their water storage, was 
approved by the Secretary of the Army on April 15, 1958. 
To date the Authority for their portion of the water supply 
storage has paid $1,619,716. Also under the contract the 
Authority and the City must pay 14.706 and 2.087 percent 
respectively of the actual cost of operation and 
maintenance. To date the Authority has paid $767,408 and 
the City has paid $121,552. A contract with the Brazos 
River Authority, for additional storage for municipal and 
industrial water supply, was approved by the Acting Assistant 
Secretary of the Army, September 28, 1984. 
Operations during fiscal yean Routine operations and 
maintenance continued. Recreation facilities under Code 
710 remain. 
Benefits accrued to Waco project: Accumulated 
flood damages prevented through FY 1987 were 
$60,053,900. 
29. WRIGHT PATMAN DAM 
AND LAKE, TX 
Location. Dam is on Sulphur River in Cass and Bowie 
Counties, Texas. Dam is 45 miles above mouth of Sulphur 
River, and about 8 miles southwest of Texarkana, Texas. 
Existing project. For description of completed improvements 
and authorizing act see Annual Report of 1984. 
Estimated cost of project is $51,945,000 which includes 
$5,449,100 Code 711, $399,939 accelerated public works 
funds, and $13,138,004 to be reimbursed by local interests, 
over a period not to exceed 50 years, for water supply 
storage, and including $2,092,040 for pro rata share of 
original reservoir cost. Construction was initiated in 
August 1948 and completed in March 1962, except real 
estate activities, construction under Code 711, and conversion 
of 120,000 acre-feet to water supply storage after completion 
of Cooper Reservoir. This project transferred to the 
Fort Worth District as of the end of FY 1979. 
Local cooperation. A contract with the city of Texarkana, 
Texas, for reserving water supply storage space was 
approved by the Secretary of the Army December 17,1968. 
To date the City has paid $391,138. 
Operations during fiscal yean Routine operation and 
maintenance continued. Recreation facilities under Code 
710 remain. 
Benefits accrued to Wright Patman project: Accumulated 
flood damages prevented through FY 1987 were 
$13,697,000. 
16-11 
Location. Dam is on Bosque River, 4.6 river miles above

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
30. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Inspection of completed local flood protection projects is 
made periodically in compliance with section 208.10, of title 
33, Code of Federal Regulations, which contains regulations 
for operation and maintenance of local floodprotection 
works approved by Secretary of the Army in accordance 
with authority in Section 3, Flood Control Act of 
June 22, 1936. See Table 16-D for inspections made this 
fiscal year. 
Inspection costs for FY from regular funds for 
maintenance were $119,436. 'Total costs to September 30, 
1987 were $730,639. 
31. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
In accordance with Flood Control Act of 1944 expenditures 
were made for scheduling flood control reservoir 
operations and preparation of reservoir regulation manual 
for Marshall Ford Dam, on the Colorado River, near City 
of Austin, 'bxas, and for preparation of reservoir regulation 
manual for Twin Buttes Dam, on Middle and South Concho 
Rivers near City of San Angelo, lbxas. Marshall Ford 
Dam was authorized by 1937 River and Harbor Act. Project 
was constructed jointly by Bureau of Reclamation and 
Lower Colorado River Authority and was completed during 
FY 1942. Twin Buttes Reservoir was authorized for construction 
by Department of Interior by Public Law 152, 
85th Congress. Construction was initiated in June 1960; 
closure of dam started in June 1962; deliberate impoundment 
was started January 23, 1963. 
Accumulated damages prevented by Marshall Ford Reservoir 
through FY 1987 were $190,093,400 and by Twin Buttes 
through FY 1987 were $418,000. Twin Buttes Reservoir 
consists of two separate pools, one on South Concho River 
and the other on Middle Concho River and Spring Creek. 
Equalizing channel between these two pools is at elevation 
1925.0. Costs for fiscal year from regular funds for operation 
of both reservoirs were $74,100,800. 
32. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 16-C.) 
33. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
(See Table 16-E.) 
Flood control activities pursuant to section 205, Public 
Law 858, 80th Congress, as amended (preauthorization); 
emergency streambank protection under section 14, Public 
Law 526, 79th Congress, as amended. 
Emergency flood control, hurricane-flood, and shore protection 
activities (Public Law 99, 84th Congress, and 
antecedent legislation). 
Fiscal year costs were $313,057 for disaster preparedness; 
no levee repair. 
Multi-Purpose Projects Including Power 
34. BELTON LAKE MODIFICATION, TX 
Location. For location of completed dam see Belton Lake, 
'Tbxas in this chapter. 
Existing project. The modification of Belton Lake to provide 
installation of hydroelectric power generating facilities 
was authorized by the Flood Control Act of 1954. The plan 
of improvement provides for reallocation of the gross 
storage capacity in Belton Lake to provide a power pool and 
the installation of hydroelectric power generatingfacilities. 
Operations during fiscal yean The modification is 
classified as deferred until the Chief of Engineers determines 
it is advisable. 
35. DAM A LAKE, TX 
Location. The dam would be located approximately 18 
miles west of Jasper and about 4 miles west of Horger, 'Thxas 
Existing project. The project is designed to be used as 
a run-of-river plant for the generation of power and to reregulate 
power surges from the proposed Rockland Lake. 
The last estimate of project cost was $3,220,000 in 1954. For 
last full report see Annual Report of 1952. 
Operations during fiscal yean The project is classified 
as deferred. 
36. ROCKLAND LAKE, TX 
Location. The dam would be located approximately 3 
miles west of Rockland, Tbxas, on the Neches River. 
Existing project. The project would control floods, 
generate hydroelectric power, and provide water supply for 
various uses. The last estimate of project cost was 
$767,000,000 (Oct. 1, 1985 base price), including 
$145,900,000 Federal cost and $621,100,000 non-Federal 
cost. For the last full report see Annual Report of 1952. 
Operations during fiscal yean The project was 
reclassified to active status December 2, 1982. 
37. SAM RAYBURN DAM AND 
RESERVOIR, TX 
Location. Dam is on Angelina River 25.2 miles upstream 
from its confluence with Neches River and about 10.0 miles 
northwest of Jasper, Thxas. 
Existing project. For description of completed improvements 
and authorizing act see Annual Report 1969. 
Construction was started August 1956 and project was 
ready for beneficial use in March 1965. Estimated cost of 
project is $68,683,000 including $3,000,000 contributed by 
local interests. 
Local cooperation. A contract with the Lower Neches 
Valley Authority, a State agency, to contribute $3,000,000 
toward the first cost and an additional $200,000 annually 
for 50 years after completion of the project was approved by 
the Secretary of the Army on January 22,1957. Contribution 
of $3,000,000 was made in full and annual payments 
to date of $3,800,000 have been made by the Authority. 
A contract with the City of Lufkin for water supply 
16-12

FORT WORTH, TEXAS DISTRICT 
storage was approved May 27,1969 by the Secretary of the 
Army at an estimated cost of $525,600. To date the City has 
paid $114,559. Also under the contract the City of Lufkin 
must pay annually 0.692 percent of the annual cost of operation 
and maintenance. To date the City has paid $116,926. 
Operations during fiscal yean Continued routine 
operation and maintenance. Recreation facilities under 
Code 710 remain. 
Benefits accrued to Sam Rayburn project: Accumulated 
flood damages prevented through FY 1987 were 
$127,494,400. 
38. TOWN BLUFF DAMB.
A. STEINHAGEN LAKE, TX 
Location. Dam is on Neches River about 12.4 miles below 
mouth of Angelina River, one-half mile north of Town Bluff, 
Texas, and 93.0 river miles north of Beaumont, Texas. 
Existing project. For description of completed improvement 
and authorizing acts see Annual Report for 1962. Construction 
started March 1947 and project was ready for 
beneficial use in April 1951. Estimated cost of project is 
$9,888,000, including $2,000,000 contribution by local 
interests. 
Local cooperation. Completed as required. 
Operations during fiscal yean Routine operation and 
maintenance continued. Recreation facilities under Code 
710 remain. 
39. TOWN BLUFF HYDROPOWER, TX 
Location. For location of completed dam see Town Bluff 
Dam-B.A. Steinhagen Lake, Texas in this chapter. 
Existing project. Installation of hydroelectric power 
generating facilities at Town Bluff Dam was authorized by 
the River and Harbor Act of 1945 (Public Law 79-14), March 
2, 1945, but deferred in the original construction. Town 
BluffDam was completed and placed in operation in 1951. 
A Feasibility Report was approved September 9,1983 and 
a Design Analysis Report completed in April 1982 indicated 
that installing hydropower at this project is now 
economically feasible. The hydropower facilities will include 
a 6,000 kilowatt power plant (two units at 3,000 
kilowatts each), intake and outlet facilities, and necessary 
switchgear equipment to be located in the main embankment 
at the old diversion channel and will be operated 
remotely from the Sam Rayburn project. The installation 
and operation of hydropower facilities will not result in the 
altering of the existing operation at Town Bluff. The project 
will produce an estimated 35,900 megawatt hours of 
energy per year. There is no Federal cost on this project. It 
is completely funded by Non-Federal funds. The estimated 
Non-Federal cost is $18,100,000. 
Local cooperation. A contract with the Sam Rayburn 
Municipal Fower Authority was approved by Secretary of 
the Army, June 28, 1985, relative to financing, escrow 
agreement, and power sales agreement. 
Operation during fiscal yean Plans and specifications 
were completed and construction on the turbine-generator 
was initiated in FY 1986. Construction on the powerhouse 
was initiated in FY 1987. Project completion date is 
scheduled for 1989. 
40. WHITNEY LAKE, TX 
Location. Dam is on Brazos River, about 442 miles above 
mouth of river, 5.5 miles southwest of Whitney, Texas, and 
about 38 miles upstream from City of Waco, Texas. 
Existing project. For description of completed improvement 
and authorizing acts see Annual Report for 1962. Construction 
of project was started June 1946 and ready for 
flood control use in December 1951. First power was placed 
on-the-line in June 1953. Raise power pool is complete. 
Estimated cost of project is $46,306,000. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. A contract with the Brazos River Authority, a State 
agency, for Water Supply Storage was approved by the 
Secretary of the Army November 3, 1982. To date the 
authority has paid $124,835. 
Operations during fiscal yean Continued routine 
operation and maintenance. Recreation facilities under 
Code 710 remain. 
Benefits accrued to Whitney project: Accumulated flood 
damages prevented throuth FY 1987 were $134,777,000. 
General Investigations 
41. SURVEYS 
Fiscal year costs were $763,314 for flood damage prevention 
studies, $93,118 for coordination with other agencies, 
and $0 for preauthorization studies Phase I for a total of 
$856,432. 
42. COLLECTION AND STUDY OF 
BASIC DATA 
Work was continued under the Flood Plain Management 
Services on the compilation of information on floods and 
potential flood damages, including identification of those 
areas subject to inundation. Fiscal year expenditures for 
these activities totaled $323,699. Fiscal year costs were 
$4,952 for hydrologic studies. 
16-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
This page intentionally left blank. 
16-14

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 16-A 
See 
Section 
in Text Project 
1. Trinity River 
Project, TX 
Includes Channel to 
Liberty, 'Tnnessee 
Colony Lake, and Dallas 
Floodway Extension 
2. Aquilla Lake, TX 
3. Bardwell Lake, TX 
4. Belton Lake, TX 
5. Benbrook Lake, TX 
6. Boggy Creek, TX 
(Federal Costs) 
(Contributed Funds) 
7. Canyon Lake, TX 
(Federal Funds) 
8. Cooper Lake and 
Channels, TX 
9. Elm Fork Floodway, TX 
10. Ferrells Bridge Dam 
Lake O' The Pines, TX 
11. Grand Prarie, TX 
Landfill 
(Contributed Funds) 
12. Grand Prairie, TX 
Myers Road 
COST AND FINANCIAL STATEMENT 
Total Cost To 
FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 17 
212,999 (-)20,000 (-)81,000 275,000 22,574,865 
216,206 53,412 161,064 235,826 22,535,638 
Funding 
New Work: 
Approp. 
Cost 
New Work: 
Aprop. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
AProp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
325,069 
249,000 
287,859 
561,200 
972,137 
57,000 
63,661 
1,236,000 
1,533,021 
(-)5,160 
2,457 
2,357,000 
2,098,363 
100,000 
79,858 
635,000 
1,065,277 
175,000 
319,458 
1,458,080 
2,502,913 
7,683 
412,000 
400,259 
1,124,800 
1,116,537 
(-)9,000 
(-)2,557 
1,622,600 
1,640,448 
58,974 
329,000 
327,291 
790,000 
789,322 
3,162 
1,278,600 
1,308,974 
1,355,200 
1,970,936 
5,000 
13,559 
1,113,000 
1,122,862 
792,000 
1,901,072 
1,424,500 
1,425,959 
11 
00 1 
86 1 
)00 1 
50 1 
,,-.. 
11 
66 
1,087,000 
1,068,610 
3,301,000 
3,181,603 
1,660,200 
1,697,636 
11 
S-218,800 (-)24,666 218,800 (-)24,666 
311,164 
211,600 
234,587 
1,247 
858 
32,589 
- 45,506,300 
13,509 45,504,976 
506,300 1,632,300 
519,866 1,610,384 
- 10,934,505 
- 10,934,505 
954,122 12,319,00918 
963,614 11,117,24718 
- 16,960,549 
- 16,960,5491 
,488,622 16,809,16418 
,481,234 16,623,88418 
- 13,130,463 
- 13,069,9912 
,100,522 17,328,93618 
,105,422 17,274,80218 
,045,000 2,065,000 
,102,585 2,031,337 
16,500 16,500 
- 19,088,524 
- 19,088,524 
,094,522 12,791,52618 
,095,387 12,520,90818 
,055,000 33,976,000 
,082,525 33,623,768 
- 662,400 
- 662,400 
- 14,175,1974 
- 14,175,197s 8 
,860,122 21,674,95318 
,854,337 21,635,11918 
- 250,000 
- 219,960 
- 345,000 
- 345,000 
- 250,000 
- 248,048 
16-15 
1,112,0 
1,140,1 
295,0 
215,9

TABLE 16-A 
See 
Section 
in bxt Project 
(Contributed Funds) 
13. Grapevine Lake, TX 
14. Hords Creek Lake, 
TX 
15. Joe Pool Lake, TX 
16. Lavon Lake, TX 
17. Lavon Lake 
Modification & East 
Fork Channel 
Improvement, TX 
18. Lewisville Dam, TX 
19. Millican Lake, TX 
20. Navarro Mills Lake, 
TX 
21. O. C. Fisher Dam 
and Lake, TX 
22. Proctor Lake, TX 
23. Ray Roberts Lake, TX 
FORT WORTH, TEXAS DISTRICT 
COST AND FINANCIAL STATEMENT 
Ibtal Cost To 
Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 17 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
8,040 
4,200,000 
5,371,807 
1,758,000 
1,743,680 
1,511 
250,000 
462,395 
1,450,600 
1,504,755 
40,000 
5,500,000 
5,165,510 
2,024,550 
2,730,034 
20,000 
18,076 
1,370,000 
1,792,382 
17,200,000 
14,842,702 
(-)14,000 
812 
1,691,150 
2,742,378 
220,000 
221,839 
755,160 
1,151,615 
2,928,000 
3,839,707 
70,000 
24,566 
(-)9,551 
2 
1,571 
1,572 
658 
650 
11,100 
5,739 
355 
354 
1,552,800 1,904,600 2,148 
1,515,928 1,945,384 2,152 
105,939 - 
2,912 
122,469 
4,274,500 
2,043,428 
36,993 
(-)184,000 
3,529 
2,054,600 
1,876,603 
23,008 
40,000
-== 
- 21,317,790 
,801 21,304,198' 
,122 19,943,890 '1
8 
,836 19,904,49418 
- 2,731,089* 
- 2,731,089 
,300 9,890,969 
,938 9,807,25618 
,000 170,889,000 
,280 165,017,256 
,800 463,800 
,030 459,948 
- 12,864,796 
- 12,864,796 
,322 20,763,94018 
,944 20,707,51418 
- 69,796,862 
184 69,796,862 
- 25,333,988 
- 25,333,988' 
3,899,822 29,251,32510o 1 
3,929,412 26,770,60410 16 
- 3,627,000 
- 3,627,000 
- - - - 9,846,759 
480 - - - 9,846,75911 
788,400 1,074,300 843,000 1,095,422 12,052,10015 
1,129,622 1,095,363 888,742 1,080,767 12,010,93611 
- - - - 16,027,467 
- - - - 16,027,467 
704,900 1,428,000 601,000 685,900 11,140,83111 
1,142,469 1,436,960 603,677 646,518 11,062,22515 
821,000 
1,522,872 
46,000,000 
44,353,854 
1,083,9 
1,107,1 
41,500,0 
40,690,9 
- - 
- 14,409 
00 1,081,000 
98 1,085,535 
00 44,118,000 
56 46,428,681 
938,0: 
942,5 
39,000,0 
33,801,1t 
36,3( 
25,7 
- 14,469,585 
- 14,469,585 
22 11,892,7541$ 
57 11,677,765' 
00 236,712,700 
89 229,537,095 
00 36,300 
54 25,754 
16-16 
- - 
- 1,924 
951,000 928,181 
1,055,580 980,194 
15,550,000 1,951,000 
14,593,636 7,404,030 
- 108,000 
- 105,918

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 16-A COST AND FINANCIAL STATEMENT 
See 
Section 
in Txt Project Funding 
36. Rockland Lake, TX New Work: 
Approp. 
Cost 
37. Sam Rayburn Dam New Work: 
and Reservoir, TX Approp. 
Cost 
Maint. 
Approp. 
Cost 
24. San Antonio Channel New Work: 
Improvement, TX Approp. 
(Federal Funds) Cost 
(Contributed Funds) New Work: 
Contrib. 
Cost 
25. San Gabriel River, New Work: 
TX Approp. 
Cost 
Granger Maint. 
Approp. 
Cost 
Lake Georgetown Maint. 
Approp. 
Cost 
26. Somerville Lake, TX New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
27. Stillhouse Hollow New Work: 
Dam, TX Approp . 
Cost 
Maint. 
Approp. 
Cost 
38. 'lbwn Bluff Dam- New Work: 
B. A. Steinhagen Approp. 
Lake, TX Cost 
Maint. 
Approp. 
Cost 
39. 'bwn Bluff New Work: 
Hydro ower, TX Contrib. 
(Contributed Funds) Cost 
28. Waco Lake, TX New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
39. Whitney Lake, TX New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
29. Wright Patman Dam New Work: 
and Lake, TX Approp. 
Cost 
Maint. 
Approp. 
Cost 
1 Excludes $47,309 receipts from reconveyance 
deposited to miscellaneous receipts. 
Total Cost To 
FY 84 FY 85 FY 86 FY 87 Sep. 30, 1986 " 
143 
3,126,800 
3,844,076 
(-)425,000 
989,645 
(-)20,000 
72,540 
709,900 
1,357,865 
475,000 
783,364 
110,000 
102,184 
2,266,800 
3,254,200 
745,300 
1,037,452 
1,011,100 
1,464,428 
1,825,300 
2,428,338 
2,594,5 
2,739,7 
808,01 
548,81 
200,0 
338,8 
1,211,7 
1,222,3 
939,0 
960,6 
17,5 
1,816,5 
1,838,9 
844,0 
843,9 
762,0 
788,2 
2,087,11 
2,093,71 
2,078,000 2,079,9 
2,807,910 2,035,3 
885,600 
1,379,767 
of land 
1,736,5 
1,744,7 
- 269,000 
- 251,649 
00 2,441,600 
58 2,455,388 
00 2,114,000 
01 2,119,855 
00 191,000 
97 181,784 
00 1,208,000 
10 1,202,657 
00 964,000 
70 980,679 
45 3,568 
00 1,563,600 
50 1,586,603 
00 841,000 
90 900,650 
00 859,000 
53 848,855 
- 1,761,000 
- 1,313,111 
00 1,838,800 
03 1,891,769 
00 2,484,600 
49 2,471,637 
00 1,541,600 
16 1,534,545 
1 
2 Excludes $322,346 receipts from reconveyance of land 
deposted to miscellaneous receipts. 
16-17 
- 269,000 
14,917 266,566 
- 60,670,957 
- 60,670,95612 
2,455,322 34,573,53616 
2,451,539 34,197,71416 
10,859,000 51,074,048 
5,985,903 45,912,914 
353,935 1,353,460 
- 999,525 
23,000 101,796,100 
36,593 101,796,100 
834,722 6,961,47818 
839,763 6,933,95318 
1,044,822 6,104,55416 
1,004,730 6,052,52416 
- 27,790,438 
27,790,436 
2,190,122 18,105,95818 
2,183,967 17,564,26218 
- 20,522,08413 
S 20,510,642 
921,122 11,170,34816 
886,513 11,092,57118 
- 6,602,737 
- 6,602,73714 
747,400 12,226,96818 
757,622 12,122,58818 
4,541,000 6,302,000 
4,417,320 5,730,431 
- 49,521,12115 
- 49,521,121 
1,772,722 18,558,78 '* 
1,800,333 18,440,6t65 1 
- 42,952,938 
- 42,952,93816 
2,428,122 31,876,00218 
2,490,316 31,492,6911 
- 35,731,626 
- 35,731,626 
2,023,322 22,728,01216 
I 1,945,964 22,587,3206

TABLE 16-A 
FORT WORTH, TEXAS DISTRICT 
COST AND FINANCIAL STATEMENT 
' Excludes $1,422,848 expended for new work from contributed 
funds, including $22,848 "Contributed Funds Other" for installation 
and operation of gages for leakage study. 
4 Includes $1,378,486 for Code 711, $52,808 for Code 713, and 
$399,739 accelerated Public Works Act funds. Excludes 
$1,711,200 contributed funds. 
* Includes $1,376,322 for Code 711, $52,808 for Code 713, and 
$399,739 accelerated Public Works Act funds. Excludes $4,137 
reimbursed in Fiscal Year 1973. 
* Claim Northeast Thxas Municipal Water District $16,546. 
Three payments of $12,410 less real estate charges of $1,325, 
making a total of $2,811 reimbursed in Fiscal Year 1972, Fiscal 
Year 1973, and Fiscal Year 1974. 
' Excludes $146,795 receipts from reconveyance of land 
deposited to miscellaneous receipts, and $2,040,026 for new work 
expended from contributed funds. 
* Excludes $105,079 expended from contributed funds. 
* Excludes receipts from reconveyance of land of $426,606 
which were deposted to miscellaneous receipts, and $3,676,661 
for new work expended from contributed funds. 
1o Includes $130,000 under appropriation 96X5125. 
11 Excludes $300,000 expended from contributed funds. 
12 Excludes $3 million expended from contributed funds. 
13 Includes receipts from disposals and revocation of funds 
related thereto. 
14 Excludes $2,000,000 contributed funds expended. 
16 Excludes $2,750,000 expended for contributed funds. 
1* Excludes $188,282 receipts from reconveyance of lands 
deposited to miscellaneous receipts. 
' Includes funds provided by the Jobs Act (PL 98-8, dated 
March 24, 1983) for projects listed in Table 16-F. 
i* Beginning Fiscal Year 1985 data shown on Table A includes 
Special Recreation Use Fees. Data for previous fiscal years have 
been changed to conform to the new procedure. 
16-18 
_ I _ _ _ _ LI L _ _ _ _ __ _ _ I__ _ _ __~I

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 16-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Aug. 13, 1968 
Mar. 31, 1960 
Jul. 24, 1946 
Sep. 3, 1954 
5. Mar. 2, 1945 
Jun. 22, 1936 
7. Mar. 2, 1945 
Sep. 3, 1954 
Aug. 3, 1955 
Mar. 2, 1945 
Oct. 27, 1965 
Jul. 24, 1946 
Jul. 24, 1946 
12. Jul. 24, 1946 
13. Mar. 2, 1945 
2. 
3. 
AQUILLA LAKE, TX 
Construction of a dam on Aquilla Creek, about 6.8 miles 
southwest of Hillsboro, Texas and about 24 miles north 
of Waco, Texas. 
BARDWELL LAKE, TX 
Construction of a dam on Waxahachie Creek about 5 miles 
south of Ennis, Texas. 
BELTON LAKE, TX 
Construction of a dam on the Leon River about 3 miles 
north of Belton, Texas. 
Modification (see Sec. 32 of Text) of the dam to provide for 
generation of hydroelectric power. 
BENBROOK LAKE, TX 
Construction of a dam on the Clear Fork of the Trinity 
River about 10 miles southwest of Fort Worth, Texas. 
BOGGY CREEK, TX 
Construction of a concrete trapezoidal channel on Boggy 
Creek beginning just above Webberville Road and 
extending downstream about 2.2 miles to just below Bolm 
Road. From there, a grass lined channel would extend 
further downstream and transition with the natural 
channel at Ed Bluestein Boulevard, a distance of about 
1.7 miles. 
CANYON LAKE, TX 
Construction of a dam on the Guadalupe River about 12 
miles northwest of New Braunfels, Texas. 
COOPER LAKE AND CHANNELS, TX 
Construction of earth-fill dam and reservoir area; channel 
clearing, realignment, and enlargement; enlargement 
and extension of existing levees; construction of appurtenant 
drainage works along main stem of Sulphur River 
above mile 126; channel clearing, realignment, and 
enlargement and levee enlargement and modification of 
appurtenant drainage works on Cuthand Creek below 
mile 24, on Sulphur River below mile 70, except in 
proposed Cooper Reservoir, miles 29 to 42, and on Middle 
Sulphur River below mile 8; channel clearing and 
realignment of Brushy Creek below mile 5; and levee 
enlargement on North Sulphur River between miles 1 
and 5. 
DAM "A" LAKE, TX 
Construction of a dam on the Neches River about 18 miles 
west of Jasper, Texas. 
ELM FORK FLOODWAY, TX 
Realignment and enlargement of the Elm Fork of the 
Trinity River and Denton Creek, and a parallel levee 
system from the existing Dallas levee system upstream 
to near the Dallas and Denton county lines. 
FERRELLS BRIDGE DAM-LAKE O' THE 
PINES, TX 
Provides for construction of an earth-f'll dam and reservoir 
area. 
GRAND PRAIRIE LANDFILL, TX 
Construction of a cutoff channel to eliminate an oxbow in 
the West Fork of the Trinity River. 
GRAND PRAIRIE, MEYERS RD, TX 
Slope Restoration with riprap side slopes along streambank 
of West Fork Trinity River, adacent to Meyers 
Road. 
GRAPEVINE LAKE, TX 
Construction of a dam on Denton Creek, a tributary of the 
Trinity River, about 20 miles northwest of Dallas, Texas. 
16-19 
S. Doc. 52, 90th Cong., 
1st Sess. 
H. Doc. 424, 82nd Cong., 
2nd Sess. 
H. Doc. 88, 81st Cong., 
1st Sess. 
H. Doc 535, 81st Cong., 
2nd Sess. 
H. Doc. 403, 77th Cong., 
1st Sess. 
Flood Control Act 
of 1936 (PL 738) 
H. Doc. 247, 76th Cong., 
1st Sess. 
H. Doc. 488, 83rd Cong., 
2nd Sess. 
S. Doc. 98, 76th Cong., 
1st Sess. 
H. Doc. 276, 89th Cong., 
1st Sess. 
H. Doc. 602, 79th Cong., 
2nd Sess. 
Flood Control Act of 
1946 
Flood Control Act of 
1946 
H. Doc. 403, 77th Cong., 
1st Sess. 
6. 
8. 
35. 
9. 
10. 
11.

TABLE 16-B 
See Date 
Section Auth< 
in Text Act 
FORT WORTH, TEXAS DISTRICT 
AUTHORIZING LEGISLATION 
orizing 
Project and Work Authorized 
14. Aug. 18, 1941 
15. Oct. 27, 1965 
16. Mar. 2, 1945 
17. Oct. 23, 1962 
Mar. 7, 1974 
18. Mar. 2, 1945 
19. Aug. 13, 1968 
20. Sep. 3, 1954 
Dec. 31, 1970 
21. Aug. 18, 1941 
22. Sep. 3, 1954 
23. Oct. 27, 1965 
36. Mar. 2, 1945 
37. Mar. 2, 1945 
24.. Sep. 3, 1954 
25. Sep. 3, 1954 
Jan. 3, 1975 
26. Sep. 3, 1954 
27. Sep. 3, 1954 
HORDS CREEK LAKE, TX 
Construction of a dam on Hords Creek, a tributary of 
Pecan Bayou, near the city of Coleman, Texas. 
JOE POOL LAKE, TX 
Construction of a dam on Mountain Creek, adjacent to the 
city limits of Grand Prairie, Texas, about 3 miles above 
the existing Mountain Creek Dam. 
LAVON LAKE, TX 
Construction of a dam on the East Fork of the Trinity 
River about 22 miles northeast of Dallas, Texas. 
LAVON LAKE MODIFICATION AND EAST FORK 
CHANNEL IMPROVEMENT, TX 
Enlarge Lavon Dam and enlargement and realignment of 
the lower 25 miles of the East Fork of the Trinity River, 
including rehabilitation of existing levees. 
Improvement of Collin County Road 115. 
LEWISVILLE DAM, TX 
Construction of a dam on the Elm Fork of the Trinity River 
near the city of Lewisville, Texas. 
MILLICAN LAKE, TX 
Construction of a dam on the Navasota River about seven 
miles north of Navasota, Texas. 
NAVARRO MILLS LAKE, TX 
Construction of a dam on Richland Creek, a tributary of 
the Trinity River, about 16 miles southwest of Corsicana, 
Texas. 
Alteration of FM Highway 3164 in Wolf Creek Park. 
O. C. FISHER DAM AND LAKE, TX 
Construction of a dam on the North Concho River just 
above San Angelo, Texas. 
PROCTOR LAKE, TX 
Construction of a dam on the Leon River about 8 miles 
northeast of Comanche, Texas. 
RAY ROBERTS LAKE, TX 
Construction of a dam on the Elm Fork of the Trinity River 
between Sanger and Aubrey, Texas, about 30 miles 
upstream from the existing Lewisville Dam. 
ROCKLAND LAKE, TX 
Construction of a dam on the Neches River approximately 
three miles west of Rockland, Texas. 
SAM RAYBURN DAM AND RESERVOIR, TX 
Construction of a dam on the Angelina River about 10 
miles northwest of Jasper, Texas. 
SAN ANTONIO CHANNEL IMPROVEMENT, TX 
Channel improvement of the San Antonio River and 
tributaries in and near the city of San Antonio, Texas. 
SAN GABRIEL RIVER PROJECT, TX 
Construction of: (1) a dam (Granger Dam and Lake) on the 
San Gabriel River about 7 miles east of Granger, Texas, 
(2) a dam (North Fork Lake) on the north Fork of the 
San Gabriel River about 3.5 miles northwest of 
Georgetown, Texas and (3) a dam (South Fork Lake) on 
the South Fork of the San Gabriel River about 3 miles 
southwest of Georgetown, Texas. 
SOMERVILLE LAKE, TX 
Construction of a dam on Yegua Creek about 2 miles south 
of Somerville, Texas. 
STILLHOUSE HOLLOW DAM, TX 
Construction of a dam on the Lampasas River about 5 
miles southwest of Belton, Texas. 
H. Doc. 370, 76th Cong., 
1st Sess. 
H. Doc. 276, 89th Cong., 
1st Seas. 
H. Doc. 533, 78th Cong., 
2nd Sess. 
H. Doc. 554, 87th Cong., 
2nd Sess. 
H. Doc. 403, 77th Cong., 
1st Sess. 
H. Doc. 341, 90th Cong., 
2nd Sess. 
H. Doc. 498, 83rd Cong., 
2nd Seas. 
H. Doc. 315, 76th Cong., 
1st Sess. 
H. Doc. 535, 81st Cong., 
2nd Sess. 
H. Doc. 276, 89th Cong., 
1st Sess. 
S. Doc. 98, 76th Cong., 
1st Sess. 
S. Doc. 98, 76th Cong., 
1st Sess. 
H. Doc. 344, 83rd Cong., 
2nd Sess. 
H. Doc. 535, 81st Cong., 
2nd Seas., and 
H. Doc. 591, 87th Cong., 
2nd Seas. 
H. Doc. 535, 81st Cong., 
2nd Seas. 
H. Doc. 535, 81st Cong., 
2nd Seas. 
16-20 
- -- -~- ---- - --~-DI---"I-- ~---YI~--"--~ Documents

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 16-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
38. Mar. 2, 1945 
39. Mar. 2, 1945 
Oct. 27, 1965 
28. Sep. 3, 1954 
40. Aug. 18, 1941 
29. Jul. 24, 1946 
TOWN BLUFF DAM-B. A. STEINHAGEN LAKE, TX 
Construction of a dam on the Neches River near Jasper, 
Texas. 
TOWN BLUFF HYDROPOWER, TX 
Construction of two units at 3,000 kilowatts each of hydroelectric 
power generating facilities connected with Town. 
Bluff Dam. B.A. Steinhagen Lake, Texas. 
TRINITY RIVER PROJECT, TX 
Construction of Tennessee Colony Dam located at river 
mile 339.2 on the Trinity River about 16 miles west of 
Palestine, Texas; a multiple purpose channel from the 
Houston, Texas ship channel to Fort Worth, Texas; a 
distance of approximately 363 miles, an extension of the 
existing Dallas, Texas, Floodway downstream approximately 
9.0 miles; a realignment and enlargement of the 
West Fork of the Trinity River from the mouth of the 
West Fork to the existing Fort Worth, Texas, Floodway, 
a distance of approximately 31 miles; and water 
conveyance facilities involving construction of about 98 
miles of pipeline from Tennessee Colony Lake to the 
existing Benbrook Lake. 
WACO LAKE, TX 
Construction of a dam on the northwest edge of Waco, 
Texas, below the confluence of the North, South, and 
Middle Bosque Rivers. 
WHITNEY LAKE, TX 
Construction of a dam on the Brazos River, about 19 miles 
southwest of Hillsboro, Texas. 
Raise the power pool 13.0 feet. 
WRIGHT PATMAN DAM AND LAKE, TX 
Construction of an earth-fill dam and reservoir. 
S. Doc. 98, 76th Cong., 
1st Sess. 
S. Doc. 98, 76th Cong., 
1st Sess. 
H. Doc. 276, 89th Cong., 
1st Sess., and 
H. Doc. 364, 90th Cong., 
2nd Sess. 
H. Doc. 535, 81st Cong., 
2nd Sess. 
H. Doc. 390, 76th Cong., 
1st Sess. 
H. Doc. 602, 79th Cong., 
2nd Sess. 
16-21

TABLE 16-C 
FORT WORTH, TEXAS DISTRICT 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 33 of Text) 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Report For Construction Maintenance 
Big Fossil Creek, TX3 1969 - - 
Big Sandy Lake, TX2 1986 - - 
Big Spring, TX2 1979 - - 
Brownwood Channel Improvement, TX5 - - - 
Carl L. Estes Dam and Lake, TX2 1979 - - 
Duck Creek Channel Improvement, TX4 1983 - - 
Fort Worth Floodway (Clear Fork), TX3 1971 - - 
Fort Worth Floodway (West Fork), TX3 1971 - - 
Greenville, TX3 1983 - - 
Lake Brownwood Modification, TX4 1983 - - 
Lake Fork Lake, Sabine River, TX5 - - - 
Navasota Lake, Navasota River, TX4 - - - 
Pecan Bayou Lake, Pecan Bayou, TX4 - - - 
Plainview Local Flood Protection Project, TX4 1979 - - 
Roanoak Lake, TX2 1979 - - 
Rutledge Hollow Creek Channel Improvement, Poteet, TX3 1969 - - 
Zacate Creek Channel, TX3 1983 - - 
Calloway Branch, Hurst, TX3 1986 - - 
I Deauthorized 1 Nov 81. 
2 Inactive. 
3 Completed. 
4 Recommended for deauthorization, H.R. 3678, August 23, 1983, 98th Congress, 1st Session. 
5 Deauthorized Nov 86. 
INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
TABLE 16-D (See Section 31 of Text) 
Location Dates of Inspection 
Big Fossil Creek 
Dallas Floodway 
East Fork 
Fort Worth Floodway 
Grand Prairie Landfill 
Grand Prairie Meyers Road 
Greenville 
Irving Floodway 
Munday 
Pleasanton 
Poteet 
San Antonio Floodway 
Sulphur River Levees 
Wheeler Creek 
Zacate Creek 
Sep. 26, 1986 
Jul. 31, 1986 
Sep. 4, 1986 
Oct. 1, 1987 
Jul. 24, 1987 
Jul. 24, 1987 
Jan. 14, 1987 
Jul. 28, 1986 
Dec. 5, 1986 
Jan. 23, 1987 & Aug. 16, 1987 
Jan. 21, 1987 
Aug. 18, 1987 
Aug. 23, 1985 
Apr. 23, 1987 
Jan. 22, 1987 
16-22 
- -- I -- -- - - I-I - -- 
- -- I -I --

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
TABLE 16-E (See Section 34 of Text) 
Project Cost 
Blockhouse Creek, Cedar Park, TX 
Bunker Hills Creek, Watauga, TX 
Burton Creek, Bryan, TX 
California Creek, Hamlin, TX 
Calloway Branch, Hurst, TX 
Chambers Creek, Everman, TX 
Delaware Creek, Dallas, TX 
Dry Branch, Irving, TX 
Dry Branch Creek, Grand Prairie, TX 
Elm Fork, Gainsville, TX 
Grassy Branch, Millsap, TX 
Little Walnut Creek, Austin, TX 
Lorean Branch, Hurst, TX 
Lower Walnut Creek, Austin, TX 
Pecan Creek, Gainesville, TX 
Singing Hills Creek, Watauga, TX 
South Mesquite, Mesquite, TX 
Spanish Oak Creek, Cedar Park, rTX 
Ten Mile Creek, De Soto, TX 
Ten Mile Creek, Duncanville, TX 
Upper Zacate Creek, Laredo, TX 
Walnut Creek, Sequin, TX 
Walnut Creek Tribs, Austin, TX 
Whitney Creek, Whitney, TX 
Zacate Creek, Laredo, TX 
$ 1,971 
5,465 
61,462 
886 
(-)120,090 
13,501 
5,295 
7,260 
66,453 
60,186 
7,394 
34,499 
113,541 
33,976 
16,531 
20,929 
43,300 
7,191 
61,656 
62,184 
7,500 
6,326 
23,701 
13,035 
172,048 
16-23 
-- -- -- -- -- --- -- II- ------ Y-~~--ap-----"--sll-U--------

ALBUQUERQUE, NM, DISTRICT* 
The district comprises the watershed of Canadian 
River and tributaries and the watershed of Arkansas 
River and tributaries in colorado including Colorado and 
New Mexico; the watershed of Rio Grande and 
tributaries including Pecos River and its tributaries 
upstream of Amistad Lake; and the watershed of 
Mimbres River and its tributaries in New Mexico. 
Note: The district watershed boundaries were revised 
in June 1986 to include the portion of New Mexico 
west of the Continental Divide. 
IMPROVEMENTS 
Flood Control 
1. Albuquerque Diversion Channels, NM. 
2. Conchas Lake, NM. ....... 
3. E1 Paso, TX. ......... 
4. John Martin Reservoir, CO. . 
5. Rio Grande Basin, NM . . . . . 
5A. Abiquiu Dam, NM . . . . . . . 
5B. Cochiti Lake, NM . . . . . . . 
5C. Galisteo Dam, NM . . . . . . . 
5D. Jemez Canyon Dam, NM. . . 
5E. Rio Grande Floodway, NM . . . 
5F. Truth or Consequences 
(Hot Springs) Unit, NM. .... 
6. Santa Rosa Dam and Lake, NM. 
Page 
17-1 
17-2 
17-2 
17-3 
17-3 
17-3 
17-4 
17-4 
17-5 
17-5 
... . 17-6 
. . . . . . 17-6 
7. Trinidad Lake, CO ................ 17-7 
8. Two Rivers Dam, NM . . . . . . . . . . . 17-7 
9. Inspection of completed flood 
control projects..............17-8 
10. Scheduling flood control 
reservoir operations . . . . . . . . . . . . 17-8 
11. Other authorized flood 
control projects . . . . . . . . . . . . . . 17-8 
12. Flood Control work under 
special authorizations . . . . . . . . . . . 17-9 
General Investigations 
13. Surveys..................17-9 
14. Collection and study of basic data . . . . . 17-9 
Flood Control 
1. ALBUQUERQUE DIVERSION 
CHANNELS, NM 
Location. In an area which comprises 'watersheds of 
ephemeral streams entering a 15-mile reach of Rio 
Grande from the east at Albuquerque, NM, and vicinity. 
Combined drainage area of tributaries is about 276 
square miles. Sandia range of the Rocky Mountains, 
which is about 12 miles east of Rio Grande, forms 
eastern border of watersheds. Crest of mountain range 
rises more than a mile over river to elevation of 
10,692 feet above mean sea level. (See Geological 
Survey Map, Albuquerque, NM, quadrangle, scale 
1:62,500.). 
Existing project. Improvements consist of north and 
south diversion channels on high ground east of and 
parallel to the valley. Channels are designed to carry 
floods equal in magnitude to standard project flood 
from all tributaries. For description of complete 
improvement and authorizing legislation see page 17-15 
of Annual Report for FY 1973. 
Local cooperation. Section 2 flood Control Act of 
1938 applies. For details of local cooperation requirements 
see page 17-2 of Annual Report for FY 1973. 
Operations and results during fiscal year. The 
North Diversion Channels prevented $6,786,000 in flood 
damages during FY 1987. The estimated total accumulated 
flood damages prevented were $56,487,900. Peak 
flood flows recorded during FY 1987 were: North 
Diversion Channel near Alameda 7,400 c.f.s.; South 
Diversion Channel: 500 c.f.s.. 
*All costs and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also appear at the end 
of this chapter. 
17-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Condition at end of fiscal year. Construction of the 
north and south diversion channels began in March 
1965, and was completed in March 1972. The South 
Diversion Channel is in good condition and well 
maintained by the local interests. The North Diversion 
Channel has experienced severe arching and cracking 
of the concrete lined portion. Construction to correct 
this problem was initiated and completed in FY 1987. 
2. CONCHAS LAKE, NM 
Location. Dam is in San Miguel County, NM, on 
Canadian River, about one-fourth mile downstream from 
confluence of Canadian and Conchas Rivers. (See 
Geological Survey State map of New Mexico, scale 
1:500,000, and Geological Survey topographic map.Tucumcari 
quadrangle, scale 1:250,000.) 
Existing project. A concrete gravity main dam 
section 1,250 feet long with a maximum height of 200 
feet above streambed located in Canadian River Canyon 
together with earth dikes on each side having an overall 
length of about 3.7 miles. Main section contains 
conduits in its base for release of water to maintain 
low flows and for drainage of reservoir, and an 
overflow, ungated spillway 300 feet long. Earth dikes 
vary in height up to 100 feet and north dike contains a 
concrete ogee-type emergency spillway 3,000 feet long. 
Reservoir has a gross storage capacity of 529,000 acrefeet 
(198-900 for flood control, 259,600 for water 
conservation and irrigation, and 70,500 dead storage). 
Dam controls 7,409 square miles of drainage area. (See 
page 17-16 of Annual Report of 1973 for authorizing 
legislation.) 
Local cooperation. None Required. 
Operations and results during fiscal year. Operation 
of reservoir continued. Reservoir was operated for 
storage of floodwaters and releases for irrigation 
purposes. $423,200 in sediment damages were prevented 
during FY 1987 while no flood damages were prevented. 
Estimated total accumulated flood and sediment damages 
prevented by the project through FY 1987 were 
$3,037,800. Estimated irrigation benefits for FY 1987 
were $240,800. Estimated total accumulated irrigation 
benefits through FY 1987 were $9,177,900. Pool 
elevation at start of FY 1987 was 4,196.34 feet with 
corresponding storage of 287,458 acre-feet. Total 
releases for reporting period were 247,820 acre-feet. 
Releases of 66,745 acre-feet were made to Arch Hurley 
Conservancy District and 2,097 acre-feet to Bell Ranch. 
Pool elevation on September 30, 1987 was 4,199.44 feet 
with corresponding storage of 315,283 acre-feet. 
Sediment deposition during the fiscal year was 3,779 
acre-feet. 
Condition at end of fiscal year. Existing project was 
essentially complete in 1940. Reservoir and appurtenances 
are in good condition and in operation. 
Irrigation of some lands under project was begun in 
November 1945. A cost sharing agreement between the 
Government and the State of New Mexico for 
additional Recreation Development at Conchas Lake was 
completed in August 1977. Costs of the facilities are 
50 percent State of New Mexico and 50 percent 
Federal. Construction of recreation facilities was 
initiated in FY 1978 and completed in FY 1983. 
3. EL PASO, TX 
Location. At El Paso, El Paso County, TX, which is 
on left bank of Rio Grande in the reach that forms 
part of international boundary between United States 
and Republic of Mexico. (Geological Survey map for El 
Paso, TX; New Mexico quadrangle, scale 1:250,000.) 
Existing project. Consists of a single-purpose flood 
control system of detention dams, diversion dikes, 
conduits and channels to collect, regulate and 
discharge arroyo runoff into Rio Grande. Runoff from 
tributary arroyos on eastern, southern, and western 
slopes of adjacent Franklin Mountains often inundates 
sections of city and its outlying suburban developments. 
Project is divided into three independent 
elements: Northwest area, Central area, and Southeast 
area. The project plan satisfies the 1933 U.S. and 
Mexico agreement on limited tributary discharge into 
the Rio Grande in El Paso, Texas. (See Table 17-B for 
authorizing legislation.) 
Local cooperation. Section 2 Flood Control Act of 
June 28, 1938 applies. 
Operations and results during fiscal year. Flood 
control dams in operation during FY 1987 and dates of 
completion of construction are as follows: Northgate 
and Range Dams (February 1973); Sunrise and Mountain 
Park Dams (October 1974); and Pershing Dam (March 
1977); Fort Bliss Diversion Channel (November 1978); 
Oxidation Pond and Buena Vista Diversion and 
Oxidation Pond Outlet Conduit (November 1980); 
Mulberry and Thorn Drive Dams (June 1982); Mesa Dam 
(September 1982); McKelligon Canyon Dam (October 
1982); Keystone Dam (September 1983); Keystone Outlet 
Conduit (March 1984); Highway Diversion Channel (May 
1985); Dam Safety Assurance Program to the existing 
Range and Northgate Dams (May 1986); and Borderland 
Diversion Channel (September 1986). During FY 1987 
flood flows and flood control storage were minimal; 
17-2

ALBUQUERQUE, NM, DISTRICT 
however, damages which would have resulted from 
these flows were prevented. The estimated total flood 
damages prevented since completion of Northgate and 
Range Dams in 1973 through FY 1987 were $22,700. 
Condition at end of fiscal year. Construction has 
temporarily ended in the Central Area. The only 
remaining work is the Pershing Dam, Dam Safety 
Assurance. The Central and Northwest Areas of the 
project are for all practical purposes 100 percent 
complete. 
The General Design Memorandum for the Southeast 
Area was completed in September 1987. 
4. JOHN MARTIN RESERVOIR, CO 
Location. On Arkansas River, 1,159 miles upstream 
from its mouth, 300 miles downstream from its source, 
in Bent County, about 18 miles upstream from the city 
of Lamar, CO. (See Geological Survey maps for Lamar 
and Las Animas, CO quadrangles, scale 1:125,000.) 
Existing project. A concrete and earthfill structure 
about 2.6 miles long with a maximum height of 106 feet 
above streambed and an overflow, gated spillway 1,174 
feet long. Total capacity of reservoir at spillway crest 
is 615,500 acre-feet (270,200 for flood control and 
345,300 for conservation and recreation storage). 
Reservoir controls a contributing drainage area of 18,130 
square miles and is operated as a unit of coordinated 
reservoir system for flood control in the Arkansas River 
Basin. Public Law 89-298 modified the act of June 22, 
1936 (49 Stat. 1570) to authorize 10,000 acre-feet of 
reservoir flood control storage space for fish and 
wildlife and recreation purposes. For detail of 
completed improvement and authorizing legislation see 
page 17-16 of Annual Report for FY 1973. 
Local cooperation. Section 3 Flood Control Act of 
June 22, 1936, applies. 
Operations and results during fiscal year. Routine 
maintenance and operation continued. Regulation of 
conservation storage continued under rules and 
regulations of Arkansas River Compact. $15,721,000 in 
flood damages and $369,900 in sediment damages were 
prevented during FY 1987. Estimated total flood and 
sediment damages prevented by project through FY 1987 
were $91,526,700. Estimated irrigation benefits for FY 
1987 were $585,600. Estimated total accumulative 
irrigation benefits were $23,274,200. Maximum pool 
elevation of 3,856.80 feet with corresponding storage of 
416,861 acre-feet occurred on May 31, 1987. Total 
releases for FY 1987 were 534,220 acre-feet. Releases 
attributed to irrigation benefits amounted to 148,904 
acre-feet. Sediment deposition was 3,303 acre-feet for 
FY 1987. 
Condition at end of fiscal year. Storage and 
operation of reservoir for irrigation began in March 
1943. Reservoir and appurtenances are in good 
condition and in operation. 
5. RIO GRANDE BASIN, NM 
Location. Improvements are on Rio Grande and 
tributaries in New Mexico. More definite locations and 
descriptions of individual projects are in following 
paragraphs and individual reports by projects. 
Existing project. The Flood Control Act of 1948 
authorized flood control phase of comprehensive plan 
of development of water resources of Rio Grande basin 
in New Mexico (H. Doc 243, 81st Cong., 1st sess.) with 
exception of Chiflo Dam and Reservoir and spillway 
gate structure at Chamita Dam. Although recommended, 
Chiflo Dam and Reservoir was deleted from 
authorized plan. It was excluded without prejudice to 
future consideration by Congress. It was requested at 
that time, by States of Colorado and Texas, that 
project be deferred for restudy regarding required 
storage and methods of operation. By the same act, 
Congress also authorized for construction irrigation 
phase of comprehensive plan as recommended by Bureau 
of Reclamation (H. Doc. 653, 81st Cong., 2nd sess.). 
The act also stipulated that work should be prosecuted 
in accordance with joint agreement approved by 
Secretary of the Army and Acting Secretary of the 
Interior on November 21, 1957. In addition, under that 
agreement Bureau of Reclamation was given responsibility 
for construction, operation, and maintenance of 
channel rectification, and drainage rehabilitation and 
extension phases of unified plan of improvement. 
Authority for Chamita Dam and Reservoir was 
abrogated when Cochiti Dam and Reservoir was 
authorized. (See Table 17-B for authorizing legislation 
and Table 17-C for existing projects.) 
All operations and costs for projects in authorized 
plan are individual reports on the following pages. 
5A. ABIQUIU DAM, NM 
Location. Project is one unit of flood control 
phase of comprehensive plan for Rio Grande and 
tributaries, New Mexico. Abiquiu Dam is on Rio Chama 
near the town of Abiquiu, NM, about 32 miles upstream 
from confluence of Rio Chama and Rio Grande. (See 
Geological Survey Map for plan and profile of Rio 
17-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Chama, NM, from mouth to mile 103, sheet 1, and 
Army Map Service, Aztec, NM; Colorado NJ 13-1, scale 
1:250,000.) 
Existing project. An earthfill dam 1,540 feet long, 
325 feet high, with a 12-foot diameter controlled 
outlet, and an uncontrolled spillway in a natural saddle 
about one mile north of left abutment. Reservoir 
provides 565,000 acre-feet of flood control and sediment 
storage. Total capacity at spillway crest is 1,212,000 
acre-feet. For detail description of completed improvements 
and authorizing legislation see Annual Report of 
1973. A major rehabilitation project was completed in 
September, 1980 and the recreation facilities were 
completed in FY 1981. 
Local cooperation. None required. 
Operations and results during fiscal year. Routine 
maintenance and operation continued. Storage and flows 
were regulated in accordance with Section 203, Flood 
Control Act of 1960. On October 1, 1986, the pool 
elevation was 6,245.38 feet. The maximum pool (6,261.06 
feet) and storage (402,258 acre-feet) occurred on June 
22, 1987. On September 30, 1987, the pool elevation 
was 6,235.98 feet with a corresponding storage of 
263,342 acre-feet. There was 2,370 acre-feet of sediment 
deposition during FY 1987. 
There were $38,890,700 in flood damages prevented 
during FY 1987. 
Sediment damages prevented were $265,400. Accumulated 
flood and sediment damages prevented by project 
since completion were $229,649,400 through FY 1987. 
Condition at end of fiscal year. Project was placed 
in operation in February 1963. Project structures are in 
good condition and in operation. 
5B. COCHITI LAKE, NM 
Location. Dam is at river mile 340 on Rio Grande 
(river mile 0 being at intersection of New Mexico-Texas 
State line with international boundary at El Paso, TX), 
near Pueblo de Cochiti, which is about 50 miles 
upstream from Albuquerque, NM. (See Geological Survey 
Maps, Cochiti Dam, NM, quadrangle and Santo Domingo 
Pueblo, NM, quadrangle, scale 1:24,000.) 
Existing project Consists of an earthfill dam about 
5.4 miles long with a maximum height of 251 feet above 
streambed. Project extends generally in an east-west 
line across Rio Grande to a point about 2 miles east 
of Rio Grande and then southward across Santa Fe 
River. An uncontrolled spillway with a 460-foot-long 
ogee-weir and a 160-foot notch 10.5 feet deep in the 
center is at the embankment on south side of Santa Fe 
River. Operational releases for flood control and 
irrigation are made through a 3-barrel gated conduit in 
left abutment on Rio Grande. Reservoir has a storage 
capacity of 492,500 acre-feet for flood control, 103,800 
acre-feet for sediment and 45,700 acre-feet for 
recreation within the sediment space, for a total of 
596,300 acre-feet. The project controls flood waters 
from a 11,695 square mile drainage area. For more 
improvement details see page 17-7 of Annual Report 
for 1980. See page 17-14 of fiscal year 1981 Annual 
Report for Authorizing Legislation. 
Local cooperation. None required. 
Operations and results during fiscal year. The 
project was completed in June 1975. On October 1, 
1986, the pool elevation was 5,330.67 feet with a 
corresponding storage of 51,158 acre-feet. The 
maximum pool elevation was 5,434.50 feet with a 
storage of 396,167 acre-feet on June 23, 1987. On 
September 30, 1987 the pool elevation was 5,398.10 feet 
with a corresponding storage of 217,130 acre-feet. 
There was 2,053 acre-feet of sediment deposition 
during FY 1987. There were $57,107,500 in flood 
damages prevented during FY 1987. Sediment damages 
prevented were $229,900. Accumulated total damages 
prevented are $251,845,300. 
Conditions at end of fiscal year. The dam and 
appurtenances were placed in operation in 1975. The 
Cochiti Recreation area was completed in 1976, with 
the Visitors Center completed in 1977. The Tetilla 
Peak recreation area was completed in 1981. Project 
structures are in good condition and in operation. 
5C. GALISTEO DAM, NM 
Location. Dam is at river mile 12 on Galisteo 
Creek, a tributary of Rio Grande. Reservoir will 
extend upstream from dam for about 4 miles to near 
village of Waldo, NM (See Geological Survey Map,. San 
Pedro 1, NM quadrangle, scale 1:24,000.) 
Existing project. Consists of an earthfill dam 2,820 
feet long with a maximum height of 158 feet above 
streambed. The outlet works consist of a 10-foot 
diameter uncontrolled outlet with a discharge capacity 
of 4,980 cubic feet per second with pool at spillway 
crest elevation. The spillway is a broad crested weir 
250 feet long in right abutment. The flood control 
storage is 89,000 acre-feet. For more details of 
completed improvements and authorizing legislation see 
17e4

ALBUQUERQUE, NM, DISTRICT 
page 17-17 of Annual Report for 1973. 
Local cooperation. None required. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. Operation of the 
project began on October 11, 1970. The reservoir was 
empty on October 1, 1986. No storage occurred during 
FY 1987. Peak inflow was 983 c.f.s. and maximum 
outflow was 993 c.f.s. There was 25 acre-feet of 
sediment deposition during the year and the reservoir 
was empty on September 30, 1987. Sediment damages 
prevented during the FY were $2,800 totaling $113,600 
through FY 1987. 
Condition at end of fiscal year. Project was placed 
in operation in October 1970. Project structures are in 
good condition and in operation. 
5D. JEMEZ CANYON DAM, NM 
Location. In Sandoval County, NM, on Jemez River 
about 2 miles upstream from confluence of Jemez River 
and Rio Grande; about 5 miles northwest of Bernalillo, 
NM (See Geological Survey map for Bernalillo quadrangle, 
scale 1:125,000.) 
Existing project. An earthfill dam 780 feet long with 
maximum height of 135 feet above streambed, and offchannel 
uncontrolled saddle spillway 400 feet wide, and 
a 13-f6ot diameter gated outlet in left abutment with 
discharge capacity of 8,340 cubic feet per second with 
pool at spillway crest elevation. The dam was raised 
14.1 feet and the spillway widened 28 feet in 1986 and 
1987 to provide adequate discharge capability and 
freeboard allowance to accommodate the revised 
probable maximum flood. Reservoir has a capacity of 
106,100 acre-feet (73,000 acre-feet for flood control and 
33,100 acre-feet for sediment control). For more 
detailed description of completed improvements and 
authorizing legislation see page 17-17 of Annual Report 
for 1973. 
Local cooperation. None required. 
Operations and results during fiscal year. On October 
1, 1986, the pool elevation was 5,197.92 feet with a 
corresponding storage of 31,089 acre-feet. The 
maximum pool elevation was 5,220.30 feet with a storage 
of 72,254 acre-feet on June 2, 1987. On September 30 
1987 the pool elevation was 5,195.46 feet with a 
corresponding storage of 27,676 acre-feet. The 
reservoir was regulated for sediment control during FY 
1987. Sediment deposition during FY 1987 was 1,146 
acre-feet. There were $1,851,000 in flood damages 
prevented during FY 1987. Sediment benefits during 
FY 1987 were $128,400. Estimated total accumulated 
flood and sediment damages prevented by the project 
through FY 1987 were $11,826,700. 
Condition at end of fiscal year. Project was placed 
in operation in October 1953. Project structures are in 
good condition and in operation. 
5E. RIO GRANDE FLOODWAY, NM 
Location. Project is one unit of flood control 
phase of comprehensive plan of improvement for Rio 
Grande Basin in New Mexico. It is on the Rio Grande 
and covers a section of the river commencing near 
Truth or Consequences (formerly Hot Springs) at about 
river mile 123 and extends upstream to Espanola, NM, 
about river mile 394. (See table 17-D on Rio Grande 
Floodway.) 
Existing project. Consists of flood protection and 
major drainage improvements by channel rectification, 
levee enlargement and construction, and bank 
stabilization work where needed to protect levees. 
Construction of project is a joint undertaking by 
Bureau of Reclamation and the Corps. Portions to be 
done by Corps will consist of levee enlargement, 
construction, and bank protection work, with channelrectification 
and drainage-rehabilitation work the 
responsibility of Bureau of Reclamation. Levees 
constructed by local interests exist through reach of 
river involved, but are not uniform as to grade, 
section, or standard of construction, and in many 
places are threatened by meandering river. (See Table 
17-D on existing project and Table 17-B for authorizing 
legislation.) 
Local cooperation. In addition to usual requirements, 
local interests are responsible for all highway, bridge, 
and public utility relocations or replacements required 
in construction of project. Local interests will also be 
required to comply with requirements of Section 221, 
1970 Flood Control Act and PL 91-646 Uniform 
Relocation Assistance Act of 1970. Total costs for all 
requirements for completed Albuquerque unit under 
terms of project authorization were $75,000. There 
were no non-Federal costs in connection with 
construction of Cochiti to Rio Puerco unit of floodway. 
Espanola Valley unit is in the deferred category. 
Neither the city of Espanola or Santa Clara Pueblo 
have not given indication they plan positive action to 
solve the flooding problem. For more details see page 
17-8 of Annual Report for 1980. 
17-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Operations and results during fiscal year. There 
were $1,148,300 in flood damages prevented by the 
completed floodway project during FY 1987. Estimated 
total accumulated flood damages prevented by the 
floodway project through FY 1987 amounted to 
$43,475,100. The peak flow of the Rio Grande through 
the middle valley was 7,840 c.f.s. at Albuquerque on 
July 24, 1987. The peak at San Acacia was 5,680 c.f.s. 
on July 22, 1987. 
Condition at end of fiscal year. Construction of 
Albuquerque unit of Rio Grande Floodway project is 
complete. The General Design Memorandum for the 
Bernalillo to Belen unit was completed in June 1986. 
San Acacia to Bosque del Apache unit was reclassified 
to the active category in July 1985. The General 
Design Memorandum for the Truth or Consequences Unit 
was completed in september 1987. The Espanola Valley 
unit was reclassified to deferred category on 17 October 
1973. 
5F. TRUTH OR CONSEQUENCES 
UNIT, NM 
Location. Vicinity city of Truth or Consequences, 
New Mexico. 
Proposed project. Authorized by the Flood Control 
Act of 1948 and 1950, is modified to provide that the 
Secretary is authorized to construct a flood control dam 
on Cuchillo Negro Creek, a tributary of the Rio Grande 
in lieu of the authorized floodway. The project will be 
constructed at an estimated total cost of $14,900,000 
($11,900,000 Federal and $4,000,000 Non-Federal) 1 
October 1987 price levels. (See Table 17-B for authorizing 
legislation.) 
Local cooperation. Water Resources Development Act 
of 1986 applies. 
Letter of intent has been received from the City of 
Truth or Consequences (dated April 23, 1986). 
Operations and results during fiscal year. The 
General Design Memorandum was completed in 
September 1987. 
6. SANTA ROSA DAM AND LAKE, NM 
Location. Lake is in Guadalupe County, on Pecos 
River, at river mile 766.4 approximately 7 miles north 
of Santa Rosa, NM (See U.S. Geological Survey map, 
Corazon, NM, sheet, scale 1:125,000.) 
Existing project Project operation began in 
November 1979. Authorized plan of improvement 
consists of an earth and rock fill dam 1,950 feet long 
and 212 feet maximum height above the streambed. 
Project purposes are flood control, irrigation and 
sediment retention. An unlined, open rock cut about 
1,000 feet back from the left abutment serves as an 
uncontrolled spillway. The outlet works, located in the 
left abutment, consists of a control tower, intake 
structure with gates, and a 10-foot diameter concrete 
lined tunnel with a terminal flip bucket energy 
dissipator. Storage capacity at the spillway crest is 
447,100 acre-feet which includes 80,100 acre-feet 
sediment reserve, 200,000 acre-feet irrigation and 
167,000 acre-feet flood control storage. Surface area 
of the reservoir at the spillway crest is 10,685 acres. 
Contributing drainage area at the dam site is 2,434 
square miles. 
For a more detailed report of the authorized project 
including the modification to existing Summer Lake see 
page 17-8 of fiscal year 1981 Annual Report. For 
authorizing legislation see page 17-14 of fiscal year 
1981 Annual Report. 
Local cooperation. In addition to first costs, 
operation and maintenance of both reservoirs will be 
responsibility of Federal Government; however, Carlsbad 
Irrigation District will be required to contribute to 
operation and maintenance costs an equal amount to 
what they now pay toward Sumner Lake. Carlsbad 
Irrigation District also has agreed to use Sumner Lake 
for flood control. Because they will realize equivalent 
benefits from storage capacity in Santa Rosa Dam and 
Lake, they will continue to fulfill their repayment 
obligation. The New Mexico Division of Parks manages 
the recreation facilities. Activities include camping, 
picnicking, boating and hiking. 
For more requirements and details on final approval 
in 1974 for transfer of irrigation storage from Sumner 
Lake to Santa Rosa Dam and Lake (formerly Los 
Esteros Lake) see page 17-5 of Annual Report for 
1980. 
Operations and results during fiscal year. The 
project was completed in late 1979 and reservoir 
operation for irrigation was started in March 1980. 
Pool elevation at start of fiscal year was 4,745.90 feet 
with storage of 105,371 acre-feet. Total releases for 
the fiscal year were 130,259 acre-feet. Pool elevation 
on September 30, 1987 was 4,747.50 acre-feet with a 
storage of 111,557 acre-feet. The maximum elevation 
was 4,749.75 feet with a storage of 120,647 acre-feet 
17-6

ALBUQUERQUE, NM, DISTRICT 
on May 8, 1987. There was 1,021 acre-feet of 
sediment deposition during the fiscal year. Sediment 
damages prevented during the fiscal year were 
$114,400. Releases attributed to irrigation benefits 
were 30,984 acre-feet Irrigation benefits for the 
fiscal year were $108,500 with an accumulative total of 
$1,117,900 through FY 1987. 
Condition at end of fiscal year. Construction 
contract for the recreation area was awarded in 
September 1979 and completed in October 1980. Design 
studies for spillway modification were initiated in FY 
1979 and construction was completed in FY 1982. 
7. TRINIDAD LAKE, CO 
Location. On Purgatoire River about 161 miles above 
its junction with Arkansas River. Project is about 4 
miles upstream from city of Trinidad, CO. (See 
Geological Survey map, Trinidad, CO, quadrangle, scale 
1:24,000.) 
Existing project Consists of an earthfill dam 6,610 
feet long, with a maximum height of 200 feet above 
streambed, an uncontrolled spillway 1,000 feet wide in 
left abutment, and a 10-foot diameter, gate-controlled 
conduit in right abutment with discharge capacity of 
5,870 c.f.s. with water surface at top of flood control 
pool. In 1985, a 3-foot high parapet wall on top of the 
upstream face of the dam and a supplemental 700-foot 
wide rock cut emergency spillway located on the right 
abutment were constructed to provide adequate 
discharge capability and freeboard allowance to 
accommodate the revised probable maximum flood. 
Reservoir provides for storage of 60,000 acre-feet for 
flood control, 39,000 acre-feet for sediment, 20,000 
acre-feet irrigation, and 4,500 acre-feet for recreation, 
a total of 123,500 acre-feet. Reservoir controls a 
drainage area of 671 square miles and will be operated 
for flood and sediment control, irrigation, and recreation 
purposes. For authorizing legislation see page 17- 
14 of fiscal year 1981 Annual Report. 
Local cooperation. Assurances of local cooperation 
received from City of Trinidad and Purgatoire River 
Water Conservancy District were formally accepted May 
11, 1967, after execution of irrigation repayment 
contract. For complete details of requirements and 
costs pertaining to the execution of the irrigation 
repayment contract and the addition of permanent 
storage for recreation facilities see page 17-9 of fiscal 
year 1980 Annual Report. 
Operations and results during fiscal year. The 
reservoir was operated for flood control and irrigation 
releases during the fiscal year. On October 1, 1986 
the pool elevation was 6,163.06 feet with a 
corresponding storage of 11,876 acre-feet. The 
maximum pool elevation was 6,222.54 feet with a 
corresponding storage of 61,668 acre-feet on June 22, 
1987. On September 30, 1987 the pool elevation was 
6,208.74 feet with a corresponding storage of 45,467 
acre-feet. Sediment deposition during FY 1987 was 729 
acre-feet. Sediment damages prevented during FY 1987 
was $272,600. Accrued sediment benefits are 
$1,974,700. Irrigation benefits for FY 1987 were 
$70,000. Accrued irrigation benefits through FY 1987 
were $1,088.000. Irrigation releases for the year were 
55,427 acre-feet. 
Conditions at end of fiscal year. The project was 
placed in operation in 1977. The recreation facilities 
were completed in 1980. The Dam Safety Assurance 
Contract was awarded in September 1982. Project 
features are in good condition and in operation. 
8. TWO RIVERS DAM, NM 
Location. About 14 miles southwest of Roswell, NM 
on Rio Hondo and Rocky Arroyo. Rio Hondo is 
formed at confluence of Rio Ruidoso and Rio Bonito, 
near village of Hondo, NM, in foothills region of Sierra 
Blanca in the southeastern part of Lincoln County, NM, 
and flows generally easterly to its confluence with 
Pecos River near Roswell, NM (See Geological Survey 
map, Hondo Reservoir quadrangle, scale 1:24,000.) 
Existing project. Diamond "A" Dam is an earthfill 
structure, 4,885 feet long and 98 feet high, with a 
gated outlet. Rocky Dam is an earthfill structure 2,940 
feet long and 118 feet high with an uncontrolled 
outlet. No provision is made for water storage except 
for flood control. Flood releases will be controlled so 
that flows through Roswell will not exceed Rio Hondo 
channel capacity which is about 1,000 c.f.s. Capacity 
of Two Rivers Reservoir at spillway crest is 168,000 
acre-feet, of which 18,000 acre-feet are provided for 
sediment reserve. Together these dams regulate runoff 
from 1,027 square miles of drainage area. For details 
of completed improvement and authorizing legislation 
see page 17-18 of Annual Report for 1973. 
Local cooperation. Section 2 Flood Control Act of 
1938 applies and compliance is satisfactory. 
Operations and results during fiscal year. Routine 
maintenance and operation continued. The reservoir 
was empty on October 1, 1986. The maximum pool 
elevation of 3,981.48 feet with a corresponding storage 
of 281 acre-feet occurred on April 22, 1987. There 
17-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
were no flood damages prevented during 1987. 
Sediment damages prevented were $176,600. Estimated 
total accumulated flood and sediment damages 
prevented through FY 1987 were $7,696,500. There 
were 1,577 acre-feet of sediment deposition during FY 
1987. The accrued sediment benefits through FY 1987 
are $834,600. 
Condition at end of fiscal year. Project is complete 
and was placed in operation July 1963. Project features 
are in good condition and in operation. 
9. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Included under this heading is inspection of completed 
flood control projects transferred to local interests for 
operation and maintenance. Projects in Texas, Colorado, 
and New Mexico were inspected. Federal costs for 
fiscal year were $104,600. 
An appropriation of $56,000 was provided through the 
Inspection of Completed Works program in FY 1987 to 
evaluate the performance of the Albuquerque North 
Diversion Channel project. 
10. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Pursuant to Section 7, Flood Control Act of 1944, 
four projects are operated by others for flood control. 
These projects are Platoro, Pueblo, Sumner, and Navajo 
Dams. 
Platoro Dam on Conejos River above the town of 
Platoro, Conejos County, CO controls runoff from 40 
square miles of high mountain area. Authorized 
purposes are irrigation storage and flood control. Total 
storage is 60,000 acre-feet with the top 6,000 acre-feet 
for flood control. The 54,000 acre-feet is joint use 
storage with flood control on a forecast basis during 
spring runoff. Platoro Dam was authorized by the 
Interior Appropriation Act of 1941. (see H Doc 693, 76th 
Cong., 3rd Sess.) Construction of project was completed 
by the Bureau of Reclamation in 1952. 
On October 1, 1986 storage in Platoro reservoir was 
52,137 acre-feet, elevation 10,026.0 feet. Maximum 
storage of 53,782 acre-feet, elevation 10,027.8 feet 
occurred on July 4, 1987. On September 30, 1987, 
storage was 43,961 acre-feet, elevation 10,016.7 feet. 
Peak flow at Mogote gage was 2,010 c.f.s. on June 10, 
1987. $551,800 in flood damages were prevented by the 
project during FY 1987. Total flood damages prevented 
to date are at $4,507,500. Total cost for activity, by 
the Corps of Engineers during FY 1987 was $13,582. 
Pueblo Dam is part of the Fryingpan-Arkansas 
project which was authorized under Public Law 87-590, 
87th Congress, HR 2206 on August 16, 1962. The 
project was completed in August 1975. Pueblo is 
operated by the Bureau of Reclamation and is located 
at river mile 1,293.7 on the Arkansas River in Pueblo 
County Colorado. Pueblo reservoir has 27,000 acre-feet 
exclusive flood space and 66,000 acre-feet joint use 
space. 
Operation of Pueblo Reservoir began on February 10, 
1974. Storage on October 1, 1986 was 251,996 acrefeet, 
elevation 4,877.74 feet. Maximum storage during 
the year was 271,010 acre-feet, elevation 4,881.87 feet 
on February 6, 1987. Storage on September 30, 1987 
was 229,777 acre-feet, elevation 4,872.65 feet. There 
were $90,200 in flood damages prevented in FY 1987. 
Total cost for FY 1987 activity, by the Corps of 
Engineers was $13,872. Total flood damages prevented 
to date are $2,852,100. 
Sumner Dam is located on the Pecos River at river 
mile 710.8 in DeBaca County, New Mexico. Sumner 
Dam was authorized as Alamogordo Dam by the 
Secretary of the Interior under a Finding of Feasibility 
approved by the President of the USA on 6 November 
1935, under the Federal Reclamation laws. The original 
project was completed in 1937. Modification work of 
raising the dam 16 feet, adding a spillway and limiting 
the service spillway floor to 56,000 c.f.s. was completed 
in 1957. A twenty-four inch bypass line was installed 
in 1977 to pass flows less than 100 c.f.s. Storage on 
October 1, 1986 was 50,571 acre-feet, elevation 4,260.7 
feet. Maximum storage for FY 1987 was 68,111 acrefeet, 
elevation 4,266.4 feet on December 25, 1986. 
Storage on September 30, 1987 was 36,803 acre-feet, 
elevation 4,255.3 feet. Total cost for FY 1987 activity, 
by the Corps of Engineers was $14,527. 
Navajo Dam and Reservoir is located on the San 
Juan River at river mile 298.6 in San Juan County, New 
Mexico. Navajo Dam was authorized as part of a 
Colorado River Storage Project by act of 84th 
Congress, 11 April 1956 (PL 485). The Bureau of 
Reclamation constructed and is responsible for 
operation of the project. Construction was initiated in 
June 1958 and the project was completed and placed in 
operation in March 1963. Storage on October 1, 1986 
was 1,508,900 acre-feet, elevation 6,072.35 feet. 
Maximum storage for FY 1987 was 1,572,400 acre-feet, 
elevation 6,076.78 feet on 7 November 1986. Storage 
17-8

ALBUQUERQUE, NM, DISTRICT 
on 30 September 1987 was 1,094,000 acre-feet, 
elevation 6,038.53 feet. Total Corps of Engineers cost 
for FY 1987 activity was $11,762. 
11. Emergency flood control activities; repair, flood 
fighting, and rescue work. (Public Law 99, 84th 
Cong., and antecedent legislation.) 
Federal costs for fiscal year 1987 were $155,356 for 
advance preparation, $13,244 for flood emergency 
operations, and there were no repair and restoration 
costs. 
12. Emergency bank protection (Sec. 14, 1946 Flood 
Control Act, Public Law 526, 79th Cong.) 
Federal costs during FY 1987 were: Arkansas River, 
Freemont County, CO $9,399; Canipa Creek at Acoma, 
NM $1,162; Fountain Creek, Stratmore Hill, CO $7,847; 
Gallup Sewage Treatment Plant, NM $5,633; Gila River, 
Redrock, NM $7,500; Ruidoso River City Road B-015, NM 
$4,628; Santa Fe River Reserve, NM $38,005; Alameda 
Street, Santa Fe, NM $7,500; Arroyo Mascaras, Santa 
Fe, NM $672; Fountain Creek, Colorado Springs, CO 
$2,035; Fountain Creek, Pueblo, CO $10,756; Fourmile 
Creek, Park Center Water System, Freemont County, 
CO $10,000; Fourmile Creek, Canyon City, CO $7,500; 
Rio Costilla, Amalia, NM $2,416 and Stratmoor Utility, 
Colorado Springs, CO $7,500. 
General Investigations 
13. SURVEYS 
Costs for the fiscal year were $735,664 for flood 
damage prevention studies, $23,265 for special studies 
(coordination studies with other agencies), and $55,968 
for preauthorization studies, Arkansas River and 
Tributaries above John Martin Dam, Colorado, Phase I. 
14. COLLECTION AND STUDY 
OF BASIC DATA 
Fiscal year costs were $190,578 for flood plain 
management and technical services. 
Hydrologic studies involving collection and study of 
basic data, such as stream flow data, collection of 
suspended sediment samples, recording rain gage data, 
hydrometeorological studies, and sedimentation studies 
continued. Costs during the fiscal year were $10,945. 
17-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 17-A COST AND FINANCIAL STATEMENT 
See 
Section 
In Text Project 
1. Albuquerque 
Diversion Channels 
Project, NM 
(Federal Funds) 
(Contributed Funds) 
(Other Contributed 
Funds) 
2. Conchas Lake, NM 
3. El Paso, TX 
4. John Martin 
Reservoir, CO 
5. Rio Grande Basin, 
NM 
5A. Abiquiu Dam, NM 
SB. Cochiti Lake, NM 
SC. Galisteo Dam, NM 
Total Cost5 
to 
Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
301,000 17,569,450 
277,737 17,546,187 
518,356 
518,356 
854,644 
854,644 
s 
31,900 
696,200 
366,107 
4,100,000 
4,267,354 
70,000 
95,377 
-2,912 
542 
805,000 
838,774 
941,000 
905,216 
7,350,000 3,538,000 
9,062,333 3,743,565 
- 13,821,4991 
- 13,821,4991 
679,322 13,245,694 
725,985 13,206,141 
598,000 58,615,294 
715,687 58,505,594 
10,022 
797,800 1,000,000 
875,971 1,020,695 
128,771 
-135,000 
1,771 
1,270,600 2,231,000 
1,292,150 2,368,302 
-9,600 
53,404 
706,900 
1,148,752 
5,000 
13,177 
100,000 
106,851 
955,000 1,085,222 
976,245 1,081,879 
14,318 
1,958,000 3,925,122 
2,032,253 3,682,277 
154 
1,014,000 
1,083,745 
9,287 
124,000 
142,277 
1,010,000 
996,402 
1,217,022 
1,208,537 
15,555,3582 
15,555,3582 
15,622,722 
15,596,558 
26,745,028 
26,745,028 
17,199,928 
16,860,193 
97,084,559 
97,084,559 
10,940,722 
10,893,153 
- 14,275,053 
- 14,275,053 
88,000 
97,215 
141,000 
135,193 
1,629,477 
1,620,905 
17-10

ALBUQUERQUE, NM, DISTRICT 
TABLE 17-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost5 
Section to 
In Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
5D. Jemez Canyon New Work 
Dam, NM Approp. -775 - 1,457,000 610,000 6,293,972 
Cost 36 - 1,457,797 601,864 6,284,633 
Maint 
Approp. 193,600 245,000 198,000 233,000 5,556,051 
Cost 342,025 269,016 201,545 195,877 5,513,144 
5E. Rio Grande New Work 
Floodway, NM Approp. 155,000 200,000 367,000 254,000 6,152,8683 
Cost 164,711 162,971 276,605 366,766 6,147,9563 
6. Santa Rosa Dam New Work 
& Lake, NM Approp. -60,000 - - - 41,041,562 
Cost 138,593 49,734 20,833 5,621 41,016,440 
Maint 
Approp. 500,000 622,000 491,000 621,000 3,773,200 
Cost 561,101 680,429 489,720 627,678 3,739,504 
7. Trinidad Lake, CO New Work 
Approp. 60,000 - - - 55,774,758 
Cost 369,297 384,730 20,746 23,344 55,774,583 
Maint. 
Approp. 290,000 535,000 459,000 441,000 4,304,500 
Cost 311,317 598,337 425,597 485,188 4,291,087 
8. Two Rivers Dam, NM New Work 
Approp. -3,625 - - - 4,847,244 
Cost 1,014 - - - 4,847,244 
Maint. 
Approp. 156,700 183,000 209,000 242,000 2,409,712 
Cost 198,258 188,678 214,225 240,312 2,401,255 
1Includes $3,492,696 maintenance and improvement Cochiti to Rio Puerco units and for preconstruction 
costs and $869,978 for emergency relief, excludes planning of Espanola Valley unit. Excludes $1,000,011 
$2,279,326, cost of initiating project under the appropriated funds transferred to Bureau of Reclamaauthority 
of Emergency Relief Appropriation Act of tion under memorandum of agreement between that 
1935 and $222,669, the cost for work performed with agency and the Corps. 
funds transferred to the Corps under Public Works 
acceleration Act of 1962. 4Starting in FY 1982, AE&D programs are funded 
2Excludes $59,977 emergency relief funds for new 
work. Includes $30,000 for Code 710. 
3Includes funds for completed Albuquerque and 
through GI appropriations. 
5lncludes funds (3,192,000) provided by Jobs Act 
(PL 98-8 March 24, 1983) for projects listed in Table 
17-F of FY 1985 Annual Report. 
17-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 17-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
In Text Act Project and Work Authorized Documents 
3. Oct. 27, 1965 
5. June 30, 1948 
May 17,1950 
July 14, 1960 
5E. June 30, 1948 
and 
May 17, 1950 
SF. June 30, 1948 
May 17, 1950 
November 17, 
1986 
EL PASO, TX 
A single-purpose flood control system of detention dams, 
diversion dikes and channels to collect, regulate and discharge 
arroyo runoff in the Rio Grande. Consists of four independent 
units (NW Area, Central Area, and two units, Copper 
System and Bluff Channel of the SE Area.) 
RIO GRANDE BASIN, NM 
Authorized to be appropriated $3,500,000 to be expended by the 
Dept. of the Army for partial accomplishment of approved 
general comprehensive plan for the Rio Grande Basin in NM 
and Colorado. 
Authorized to be appropriated an additional $39,000,000 for 
Department ofthe Army for prosecution of comprehensive plan 
for the Rio Grande Basin. 
Authorized Cochiti Dam on Rio Grande and Galisteo Dam on 
Galisteo Creek as additions to authorized comprehensive plan 
for Rio Grande Basin (Cochiti Dam was authorized in lieu of 
Low Chamita Dam of Chamita Reservoir Project on Rio Chama 
under "substitute plan"). Also authorized to be appropriated 
an additional $58,300,000 for Dept. of the Army for this 
addition to comprehensive plan for the Rio Grande Basin. 
RIO GRANDE FLOODWAY, NM 
Channel rectification, levee enlargement and construction, and 
bank stabilization on Rio Grande between river mile 123 and 
394 (See Table 17D.) 
TRUTH OR CONSEQUENCES UNIT, NM 
Approved comprehensive plan for Rio Grande Basin is set forth 
in the Report of the Chief of Engineers dated April 15, 1948, 
for flood control of Rio Grande Basin. 
In addition to previous authorizations, the completion of the 
plan approved in the Flood Control Act of 1948, for the Rio 
Grande Basin, at an estimated cost of $39,000,000. 
Modify previous authorizations to provide that the Secretary is 
authorized to construct a flood control dam on Cuchillo Negro 
Creek in lieu of the authorized floodwav. 
H. Doc. 207, 89th 
Cong., 1st 
sess. 1 
H. Doc. 243, 81st 
Cong., 1st sess. 
Public Law 516, 
81st Cong., 2nd 
sess. 
S. Doc. 94, 86th 
Cong. 
H. Doc. 243, 81st 
Cong., 1st 
sess.' and 
Public Law 516, 
81st Cong., 2nd 
sess. 
H. Doc. 243, 81st 
Cong., 1st sess. 
H. Doc. 243, 81st 
Cong., 1st sess. 
Public Law 662, 99th 
Cong., 2nd sess. 
Contains latest published maps. 
17-12

ALBUQUERQUE, NM, DISTRICT 
TABLE 17-C 
RIO GRANDE BASIN, NM 
RIO GRANDE BASIN, NM: EXISTING PROJECT 
(See Section 9 of Text) 
Drainage 
Miles Area Total 
Above Nearest (square Estimated 
Project River Mouth Town mile) Description Cost 
Abiquiu Dam Rio Chama 32 Espanola, 2,147 Earthfill 325 feet high, 26,797,096 
NM 1,212,000 acrefeet capacity 
Jemez Canyon Jemez 2 Bernalillo, 1,034 Earthfill 136 feet high, 106,100 4,217,206 
Dam NM acre-feet capacity 
Rio Grande Rio Grande 123 to 3941 - - Channel rectification, levee 25,744,0002 
Floodway enlargement and construction 
Cochiti Lake Rio Grande 3401 Cochiti,NM 11,695 Earthfill 251 feet high, 596,300 96,900,000 
acre-feet capacity 
Galisteo Dam Galisteo Creek 8 Waldo, NM 596 Earthfill 158 feet high, 89,000 14,340,280 
acre-feet capacity 
'River mile 0 is at intersection of New Mexico-Texas State Line with international boundary at El Paso, Texas. 
2Does not include non-Federal costs. 
3Includes $5,383,000 major rehabilitation, $138,900 for recreation facilities. 
RIO GRANDE FLOODWAY,NM 
TABLE 17-D EXISTING PROJECT 
(See Section 9E of Text) 
Location Estimated 
Reach (river miles)1 Cost 
Truth of Consequences unit (formerly Hot Springs) 123 to 129 $9,200,000 
San Acacia to Bosque del Apache unit 155 to 226 6,200,000 
(1960) 
Cochiti to Rio Puerco unit (not including Albuquerque unit) 236 to 340 2,658,000 
Albuquerque unit 286 to 305 3,130,0004 
Espanola Valley unit 366 to 394 456,000 
(1970) 
1River mile 0 being at intersection of New Mexico-Texas State line with international boundary at El Paso, Texas. 
2Deferred for restudy. 
3In addition, $1,650,000 incurred by the Bureau of Reclamation in this reach. 
41n addition, $ 75,000 incurred by local interest in this reach. 
51n addition, estimated cost to local interests is $69,000 (1970). 
17-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 17-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
Project 
Alamogordo diversion channel, Tularosa (dclosed) Basin, New Mexico 
Alpine, Texas3 
Cibolo Creek, Texas' 
Colorado Springs, Fountain que Bouille River, Colorado 
(Templeton Gap Floodway)1 
Creede, Willow Creek, Colorado (floodway)' 
Highway 12, Colorado 
Holly, Colorado' 
Las Animas, Colorado2 
Las Cruces New Mexico 2 
Pecos, Texas3 
Pinon Canyon Dam, Trinidad, Colorado (Sec.212)' 
Pueblo Arkansas River, Colorado (floodway levee extension)1 
Santa Fe River and Arroyo Mascaras, New Mexico 3 
Smith Creek, Colorado1 
Socorro diversion channel, tributaries of Rio Grande, New Mexico 
'Completed. 2Responsibility of local interests. 3lInactive. 
- -- -- 
Cost to September 30, 1987 
Construction 
189,356 
130,488 
829,500 
Operation & 
Maintenance 
For Last 
Full Report 
See Annual 
Report For 
1966 
1977 
1983 
1959 
1952 
1985 
1985 
1980 
1980 
1977 
1954 
1983 
1985 
1965 
4Deferred. 
17-14 
881,262 
219,789 
120,500 
2,021,400 
4,956,000 
4,752,310 
480,273 
130,678 
201,958 
1,123,900 
219,000 
2,259,328 
..

LITTLE ROCK, AR DISTRICT *
The civil works portion of this District covers an area 
of approximately 36,414 square miles in northern, western, 
and southwestern Arkansas and a portion of Missouri 
within the Arkansas, Little, and White River 
Basins. The District's responsibilities include those areas 
embraced in the drainage basin of the Arkansas River 
and its tributaries above and exclusive of Pine Bluff, AR, 
and below the mouth of the Poteau River, near Fort 
Smith, AR. The District has responsibility for planning, 
design, construction and operation and maintenance of 
the navigation portion of the McClellan-Kerr Arkansas 
River Navigation System in the State of Arkansas 
(including that portion below Pine Bluff). The District's 
responsibilities in the Little River Basin covers those 
AR, DISTRICT 
portions of the drainage basin of the Arkansas portion of 
Little River and its tributaries above its mouth near 
Fulton, AR. The District's responsibilities in the White 
River Basin cover those portions in southern Missouri 
and northern and eastern Arkansas embraced in the 
White River drainage basin and its tributaries above 
Peach Orchard Bluff, AR. The Memphis District is 
responsible for navigation maintenance on the White 
River below Newport, AR, to the mouth of Wild Goose 
Bayou, in Arkansas County, AR. The White River 
downstream from the mouth of Wild Goose Bayou is part 
of the McClellan-Kerr Arkansas River Navigation 
System. 
IMPROVEMENTS 
Navigation Page 
1. Arkansas River Basin, AR, OK, and KS .... 18-2 
2. Arthur V. Ormond Lock and Dam 
(No. 9), AR ................................ 18-2 
3. Bank Stabilization & Channel 
Rectification AR .......................... 18-2 
4. David D. Terry Lock and Dam 
(No. 6), AR ............................... 18-3 
5. James W. Trimble Lock and Dam 
(No. 13), AR .............................. 18-3 
6. Little Rock Slackwater Harbor, 
Arkansas River, AR ...................... 18-3 
7. Lock No. 2 and Wilbur D. Mills, 
Dam (No. 2), AR ......................... 18-3 
8. Lock and Dam No. 3, AR ................. 18-3 
9. Lock and Dam No. 4, AR ................. 18-3 
10. Lock and Dam No. 5, AR ................. 18-3 
11. Maintenance and Repair Fleet and 
Marine Terminals, AR .................... 18-3 
12. Murray Lock and Dam (No. 7), AR ........ 18-3 
13. Navigation Work Under Special 
Authorization ............................. 18-4 
14. Norrell Lock and Dam (No. 1) and 
Entrance Channel, AR .................... 18-4 
15. Other Authorized Navigation Projects ..... 18-4 
16. Toad Suck Ferry Lock and Dam 
(No. 8), AR ................................ 18-4 
Flood Control 
17. Blue Mountain Lake, AR .................. 18-4 
18. Clearwater Lake, MO ...................... 18-4 
19. DeQueen Lake, AR ....................... 18-4 
20. Dierks Lake, AR ......................... 18-5 
21. Flood Control Work under Special 
Authorization ............................. 18-5 
22. Fourche Bayou Basin, Little Rock, AR ...... 18-5 
23. Gillham Lake, AR ......................... 18-5 
24. Inspection of Completed Flood 
Control Projects .......................... 18-6 
25. Little Massard Creek, Fort Smith, AR ..... 18-6 
26. Little Red River & Tributaries, 
Clinton, AR .............................. 18-6 
27. Little River Basin (Little Rock District), 
A R ...................................... 18-6 
Flood Control (cont) 
28. Mill Creek, Fort Smith, AR ............... 18-6 
29. Millwood Lake, AR ....................... 18-6 
30. Nimrod Lake, AR ......................... 18-7 
31. Other Authorized Flood Control 
Projects...................................18-7 
32. Otter Creek & Tributaries, 
Shannon Hills, AR ........................ 18-7 
33. White River Basin (Little Rock District) 
AR & M O ................................ 18-7 
34. White River, Jacksonport, AR .............. 18-7 
Multiple-Purpose Projects Including Power 
35. Beaver Lake, AR ......................... 18-8 
36. Bull Shoals Lake, AR ..................... 18-8 
37. Dardanelle Lock and Dam (No. 10), AR ..... 18-8 
38. Greers Ferry Lake, AR ................... 18-8 
39. Norfork Lake, AR ........................ 18-9 
40. Ozark-Jeta Taylor Lock and Dam 
(No. 12), AR .............................. 18-9 
41. Table Rock Lake, MO ..................... 18-9 
General Investigations 
42. Surveys ................................... 18-9 
43. Collection and Study of Basic Data ........ 18-9 
44. Continuation of Planning and Engineering..18-10 
Cost & Financial Statement ....... 18-11 
Authorizing Legislation .......... 18-14 
Other Authorized 
Navigation Projects .............. 18-16 
Not Applicable 
Other Authorized Flood 
Control Projects ................. 18-17 
Not Applicable 
Deauthorized Projects ............ 18-18 
Arkansas River Basin; AR, OK, 
and KS: Navigation .............. 18-19 
Arkansas River Basin; AR, OK, 
and KS: Lakes .................. 18-22 
Little River Basin, AR: Lakes ..... 18-23 
White River Basin, AR and MO: 
Lakes ........................... 18-24 
Flood Control Work Under 
Special Authorization ............ 18-25 
Tables 
Table 18-A 
Table 18-B 
Table 18-C 
Table 18-D 
Table 18-E 
Table 18-F 
Table 18-G 
Table 18-H 
Table 18-I 
Table 18-J 
Table 18-K 
Table 18-L 
18-1 
_ __ C

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. ARKANSAS RIVER BASIN, AR, 
OK, AND KS 
Location. Arkansas River rises in Rocky Mountains 
near Leadville, CO, and flows southeastward 1,396 miles 
through Colorado, Kansas, Oklahoma, and Arkansas to 
join Mississippi River 559 miles above Head of Passes, 
LA. (See Geological Survey state maps, 1:24,000, and 
flood control and navigation maps of Mississippi River, 
Cairo, IL, to Gulf of Mexico, 1970 edition scale 1:62,500.) 
Previous projects. For details see page 1066, Annual 
Report for 1932, and pages 744, 864, and 881, Annual 
Report for 1943. 
Existing project. Provides for improvement of Arkansas 
River Basin by construction of coordinated developments 
for navigation, hydroelectric power, flood control, 
water supply, sediment control, recreation, and fish 
and wildlife propagation. McClellan-Kerr Arkansas 
River Navigation System provides a channel of 9 feet 
deep and 445.3 miles long, beginning at mouth of White 
River, which enters Mississippi River 599 miles above 
Head of Passes, LA, thence 9.8 miles upstream to mouth 
of Wild Goose Bayou; thence 9.2 miles by a land cut, 
designated as Arkansas Post Canal to mile 42 (1943 
survey) on Arkansas River; thence 376.0 miles along 
channel of latter stream to mouth of Verdigris River at 
navigation mile 395.0; thence 50.3 miles up Verdigris 
River to head of navigation at Catoosa, OK Waterway is 
canalized throughout its length by 17 locks and dams 
with total lift of 420 feet. Dardanelle, Ozark-Jeta Taylor, 
Robert S. Kerr, and Webbers Falls are multiple-purpose 
projects including power. Lock chambers are 110 by 600 
feet. A minimum channel width of 150 feet is provided 
for Verdigris River, 225 feet for San Bois Creek, 250 feet 
for Arkansas River, and 300 feet for Arkansas Post Canal 
and White River. Other coordinated developments consist 
of 15 lakes, of which 13 are in Tulsa District, Kansas 
and Oklahoma, and two in Little Rock District. Pertinent 
data and estimated Federal cost are summarized in 
Tables 18-H and 18-I, and Arkansas River Basin; AR, 
OK, and KS: Navigation Lakes. For authorization see 
Table 18-B, Authorizing Legislation. 
Local cooperation. For McClellan-Kerr Arkansas 
River Navigation System, local interests must provide 
adequate terminal and transfer facilities and bear increased 
cost of maintenance and operation of all altered 
rail and highway routes, including bridges and appurtenances, 
utilities, and other existing improvements, 
other than federally owned. For lakes see requirements 
for each individual lake. 
Terminal facilities. Public port facilities are in 
operation at Pine Bluff-Jefferson County, Little Rock, 
and Fort Smith, AR, and Muskogee and Catoosa (Tulsa- 
Rogers County), OK. Port authorities have been organized 
to develop public facilities at North Little Rock, 
Dardanelle-Russellville, Morrilton, Clarksville, Ozark 
and Van Buren, AR, and Sallisaw, OK. Terminal facilities 
are in operation or being built at 35 locations in 
Arkansas and at 25 locations in Oklahoma along the 
improved waterways. 
Operations and results during fiscal year. Continued 
operation and maintenance. (See Tables 18-H and 
18-I for navigation and lakes listings.) For details of 
McClellan-Kerr Arkansas River Navigation System and 
lakes in Oklahoma and Kansas, see the Tulsa District 
report. Details of McClellan-Kerr Arkansas River Navigation 
System and lakes in Arkansas are shown on the 
following pages. 
Condition at end of fiscal year. See Tables 18-H and 
18-I, Arkansas River Basin; AR, OK, and KS: Navigation/
Lakes for status for individual items, navigation 
project, lakes, and basin plan. The overall project is 99 
percent complete. Construction of the Holla Bend Closure 
(Arthur V. Ormond Lock and Dam) was completed 
in September 1987. Remaining work on the Arkansas 
River project in this District is continuation of rock 
removal in Pool 7, construction of meander cutoff levee 
between the Arkansas and White Rivers, land acquisition, 
continue detailed engineering studies to modify 
Wilbur D. Mills Dam (No. 2), to improve navigation at 
the Entrance Channel, and raising the existing North 
Little Rock floodwall and levee. 
2. ARTHUR V. ORMOND 
LOCK & DAM (NO. 9), AR 
Location, existing project, local cooperation, and 
terminal facilities. See Section 1. 
Operations and results during fiscal year. Continued 
operation and maintenance. Construction of Holla 
Bend closure structure (fish and wildlife mitigation) 
began in July 1986. Holla Bend Closure was completed in 
September 1987. Non-Federal hydropower is being developed 
at the project under the authority provided by 
the Federal Energy Regulatory Commission. 
Condition at end of fiscal year. Construction began 
in April 1965 and lock and dam was placed in operation 
in July 1969. 
3. BANK STABILIZATION & 
CHANNEL RECTIFICATION, AR 
Location. Several bank stabilization and channel 
rectification projects are laid out in various reaches 
extending from fixed point to fixed point on Arkansas 
River from 33.7 to 362 miles above mouth and across the 
Arkansas-White cutoff, a 4- to 5-mile natural channel 
joining Arkansas and White Rivers about 18 and 12 miles 
above their respective mouths. 
Existing project. Bank stabilization and channel 
rectification is a part of McClellan-Kerr Arkansas River 
Navigation System. For a complete description of reach 
and location of each bank stabilization and channel 
rectification project, see the Annual Report FY 81. Total 
Federal cost to date is $119,300,184 for existing project in 
Little Rock District. For authorization see Table 18-B, 
Authorizing Legislation. 
18-2

LITTLE ROCK, AR, DISTRICT 
4. DAVID D. TERRY LOCK AND 
DAM (NO. 6), AR 
Location, existing project, local cooperation, and 
terminal facilities. See Section 1. 
Condition at end of fiscal year. Construction began 
in January 1965 and lock and dam was placed in 
operation in August 1968. 
5. JAMES W. TRIMBLE 
LOCK AND DAM NO. 13, AR 
Location, existing project, local cooperation, and 
terminal facilities. See Section 1. 
Operations and results during fiscal year. Operation 
and maintenance continued. Non-Federal hydropower 
is being developed at the project under the 
authority provided by the Federal Energy Regulatory 
Commission. 
Condition at end of fiscal year. Construction began 
in October 1965 and lock and dam was placed in 
operation in April 1969. Bridge across dam was completed 
in July 1968. 
6. LITTLE ROCK SLACKWATER 
HARBOR, 
ARKANSAS RIVER, AR 
Location. On the right bank of the Arkansas River at 
navigation mile 111.5, Little Rock, AR, along the Arkansas 
River. 
Existing project. The Corps excavated an access 
channel 130 feet wide and 4,800 feet long with a 500-foot 
diameter turning basin at the landward end. The sponsor 
paid for the excavation of 50-foot berthing areas along 
the channel, provided the land and constructed levees to 
contain the excavated material. The sponsor will also 
extend utilities to the site and provide improvements 
necessary for use of the disposal area by water-oriented 
industry. Construction cost was $1,803,991: $763,869, 
Federal; $1,067,122, non-Federal. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. The 
project has been turned over to the Little Rock Port 
Authority for operation. 
Condition at end of fiscal year. Construction began 
in January 1987 and was completed in September 1987. 
7. LOCK NO. 2 AND WILBUR D. 
MILLS DAM (NO. 2), AR 
Location, existing project, local cooperation, and 
terminal facilities. See Section 1. 
Operations and results during fiscal year. Operation 
and maintenance continued. The barges that 
clogged the dam gates during the December 1982 flood 
revealed that, with a certain set of circumstances (higher 
than normal head combined with the clogged gates 
resulted in high current velocity that caused both upstream 
and downstream scouring), the structure could 
fail. This condition exists primarily because the structure 
was constructed on piling and designed for all of the 
gates to operate in unison. A model study by the Waterways 
Experiment Station determined the most feasible 
solution to this problem is to extend the stilling basin 
downstream. Studies are continuing on the type of 
extension. 
Condition at end of fiscal year. Construction began 
in May 1963. Lock was placed in operation in April 1967 
and dam was placed in operation in March 1968. Emergency 
repairs to the scour protection features and tainter 
gates at the dam that resulted from the barge accident in 
December 1982 were completed in FY 85. 
8. LOCK AND DAM NO. 3, AR 
Location, existing project, local cooperation, and 
terminal facilities. See Section 1. 
Operations and results during fiscal year. Operation 
and maintenance continued. 
Condition at end of fiscal year. Construction began 
in May 1963 and lock and dam was placed in operation in 
December 1968. 
9. LOCK AND DAM NO. 4, AR 
Location, existing project, local cooperation, and 
terminal facilities. See Section 1. 
Operations and results during fiscal year. Operation 
and maintenance continued. 
Condition at end of fiscal year. Construction began 
in May 1964 and lock and dam was placed in operation in 
December 1968. 
10. LOCK AND DAM NO. 5, AR 
Location, existing project, local cooperation and 
terminal facilities. See Section 1. 
Operations and results during fiscal year. Operation 
and maintenance continued. 
Condition at end of fiscal year. Construction began 
in November 1964 and lock and dam was placed in 
operation in December 1968. 
11. MAINTENANCE AND REPAIR 
FLEET AND MARINE 
TERMINALS, AR 
Location, existing project, local cooperation, and 
terminal facilities. See Section 1. 
Operations and results during fiscal year. Operation 
and maintenance continued. 
Condition at end of fiscal year. Construction of Pine 
Bluff Marine Terminal began March 1968 and it was 
placed in operation in April 1969. Construction of Dardanelle 
Marine Terminal began June 1968 and it was 
placed in operation in November 1969. 
12. MURRAY LOCK AND DAM 
(NO. 7), AR 
Location, existing project, local cooperation, and 
terminal facilities. See Section 1. 
18-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Operations and results during fiscal year. Excavation 
of the high rock in Pool 7 is 50 percent complete. 
Non-Federal hydropower is being developed at the 
project under the authority provided by the Federal 
Energy Regulatory Commission. Recreation facilities 
are complete except for cost sharing items under the 710 
program. Operation and maintenance continued. 
Condition at end of fiscal year. Construction began 
in November 1964 and lock and dam was placed in 
operation in October 1969. 
13. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Preauthorization studies under the small project continuing 
authorization program: Navigation activities, 
Section 107, Public Law 86-645, as amended. Little Rock 
Slackwater Harbor, Little Rock, AR FY 87 costs, 
$790,163 (For details see project writeup); Russellville- 
Dardanelle Port, AR costs, 0. 
14. NORRELL LOCK AND DAM 
(NO. 1) AND ENTRANCE 
CHANNEL, AR 
Location, existing project, local cooperation, and 
terminal facilities. See Section 1. 
Recommended modification. The Waterways Experiment 
Station (WES), Vicksburg, MS, is conducting a 
test model of an addition lock and dam in the White River 
Entrance Channel. This alternative is being tested to 
relieve restrictions on the navigation system during low 
flows. WES has determined that the other alternatives 
tested would not solve the low-flow problem. 
Operations and results during fiscal year. Operation 
and maintenance continued. 
Condition at end of fiscal year. Construction began 
in May 1963 and lock and dam was placed in operation in 
June 1967. 
15. OTHER AUTHORIZED 
NAVIGATION PROJECTS 
See Table 18-C, Other Authorized Navigation Projects. 
16. TOAD SUCK FERRY LOCK AND 
DAM (NO. 8), AR 
Location, existing project, local cooperation, and 
terminal facilities. See Section 1. 
Operations and results during fiscal year. Continued 
operation and maintenance. 
Condition at end of fiscal year. Construction began 
in July 1965 and lock and dam was placed in operation in 
November 1969. Conway water supply project was 
completed and transferred to that city for operation and 
maintenance in July 1983. 
Flood Control 
17. BLUE MOUNTAIN LAKE, AR 
Location. See Table 18-I, Arkansas River Basin, AR, 
OK, and KS: Lakes. 
Existing project. Estimated cost is $5,069,974. For 
further information see pages 906 and 907 of 1962 
Annual Report. For authorization see Table 18-B. 
Local cooperation. Section 2, Flood Control act of 
1938 applies. 
Operations and results during fiscal year. Operation 
and maintenance of project continued. Estimated 
monetary benefits at end of fiscal year attributed to Blue 
Mountain Lake for prevention of flood damages were 
$162,000 for a total of $19,047,000 through September 30, 
1987. 
Condition at end of fiscal year. Project is complete 
except for additional recreation sanitary facilities. Construction 
of project began in May 1940, and was placed in 
operation in March 1947. 
18. CLEARWATER LAKE, MO 
Location. See Table 18-K. White River Basin, AR 
& MO. 
Existing project. Estimated cost is $11,395,000. For 
further information see pages 897 and 898 of 1962 
Annual Report. For authorization see Table 18-B, Authorizing 
Legislation. 
Project modification. A contract was awarded in 
July 1987 to construct a seepage berm on the upstream 
face of the dam, a grout curtain on the right abutment, 
and a parapet wall along the dam. An additional 9 
acres of land will be required to widen the spillway 
from 190 feet to 370 feet. The parapet wall and the 
widened spillway will pass about 90 percent of the 
probably maximum floor. The estimated project cost is 
$10,700,000. 
Local cooperation. Section 2, Flood Control Act of 
1938 applies. 
Operations and results during fiscal year. Operation 
and maintenance of project continued. Total estimated 
monetary benefits attributed to Clearwater 
Lake for prevention of flood damages through September 
30,1987 totaled $74,772,000. Releases made from 
lake during low-water periods were sufficient to supply 
municipal water for Poplar Bluff and other usages. 
Condition at end of fiscal year. Project is complete 
except for addition and improvement to existing sanitary 
recreational facilities. Construction of project began in 
June 1940 and was ready for beneficial use in March 
1948. 
19. DEQUEEN LAKE, AR 
Location. On Rolling Fork River, river mile 22.8, a 
tributary of Little River, in Sevier County, about 4 miles 
northwest of DeQueen, AR. (See Geological Survey map 
for Chapel Hill, AR, quadrangle, scale 1:24,000.) 
18-4

LITTLE ROCK, AR, DISTRICT 
Existing project. An earthfill dam, 2,360 feet long, 
constructed to 160 feet above streambed. An uncontrolled 
spillway, 200 feet wide, is about 1,400 feet east of 
main embankment. Outlet works consist of a gated 
conduit, 12 feet in diameter. The lake controls 169 square 
miles of drainage area and provides a total storage of 
136,100 acre-feet (101,200 for flood control storage and 
34,900 for conservation and sedimentation reserve). Federal 
cost of project is $19,623,752. (See Table 18-B for 
authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 
1938, and Section 301, Water Supply Act of 1958, as 
amended, apply. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. Estimated monetary 
benefits attributed to DeQueen Lake for prevention 
of flood damages were $108,000 for a total of $4,672,000 
through September 30, 1987. 
Condition at end of fiscal year. Construction began 
April 1966 and project placed in useful operation in 
August, 1977. 
20. DIERKS LAKE, AR 
Location. On Saline River, river mile 56.6, a tributary 
of Little River, about 5 miles northwest of Dierks, 
Howard County, AR. (See Geological Survey map for 
Dierks Dam, AR, quadrangle, scale 1:24,000.) 
Existing project. An earthfill dam, 2,760 feet long, 
about 153 feet above streambed. An uncontrolled spillway 
800 feet wide is in a saddle at west end of dam. Outlet 
works consisting of a gated 6- by 9-foot oblong conduit, 
one 24-inch low-flow pipe, and one 30-inch water supply 
pipe are provided. The lake controls a drainage area of 
114 square miles and provides for storage of 67,100 acrefeet 
for flood control and 29,700 acre-feet for water 
supply, conservation, and sedimentation reserve, a total 
of 96,800 acre-feet. Federal cost of project is $16,002,781. 
(See Table 18-B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 
1938, and Water Supply Act of 1958, as amended, apply. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY 87 are estimated at $109,000; total 
cumulative flood damages prevented are estimated at 
$2,823,000. During the year, 238 acre-feet of water 
supply storage were withdrawn by Tr-Lakes Water 
District. 
Condition at end of fiscal year. Construction began 
in June 1968. The embankment closure was made on May 
8, 1975 and the project placed in useful operation. 
21. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
(1) Emergency bank protection, Section 14, Public 
Law 79-526. Fiscal year costs were $24,808: Black River 
Clober Bend, AR, $12,500; Black River Highway HH, 
Wayne County, MO, $163; Bryant River Warren Bridge, 
Ozark County, MO, $6,002; Swan Creek Bridge Taney 
County, MO, $6,144. 
(2) Floor control activities, Section 205, Public Law 
80-858. Fiscal year costs were $446,787 (for more information, 
see Table 18-L). 
(3) Snagging and clearing of navigable streams and 
tributaries in interest of flood control, Section 208, Public 
Law 73-780. Fiscal year costs were $31,997, White River, 
St. Paul, AR, project. 
(4) Emergency flood control activities, Rehabilitation 
work, under Public Law 84-99, of Crawford County 
Levee District is physically complete; FY 87 costs are 
$53,506. 
22. FOURCHE BAYOU BASIN, 
LITTLE ROCK, AR 
Location. On Fourche, Rock and Grassy Flat Creeks 
in vicinity of Little Rock, Pulaski County, AR. 
Existing project. The flood damage reduction channel 
project consists of widening, clearing and snagging 
with alteration of highway and railroad bridges. The 
project was authorized by the Water Resources Development 
Act of 1986 (PL 99-662). The estimated project 
cost is $22,900,000; $14,000,000 Federal, $8,900,000, 
non-Federal. 
Local cooperation. The city of Little Rock, the project 
sponsor, signed the .local cooperation agreement on 
August 20, 1987. 
Operations during the fiscal year. Funds have been 
provided ($360,000) to prepare plans and specifications 
for the first contract, to initiate design of other contract 
items, and to initiate construction. The first construction 
contract ($1,792,000) was awarded September 28, 1987. 
23. GILLHAM LAKE, AR 
Location. Damsite is on Cossatot River, river mile 
49.0, in Howard County, about 5 miles northeast of 
Gillham, Sevier County, AR. (See Geological Survey map 
for Gillham Dam, quandrangle, AR, quandrangle, scale 
1:24,000.) 
Existing project. For description of completed improvement 
see Page 19-12 of Annual Report for 1977 
(Tulsa District). Federal cost of project is $17,826,703. 
(See Table 18-B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 
1938, and Water Supply Act of 1958, as amended, apply. 
Tr-Lakes Water District furnished a resolution of intent 
to repay costs allocated to water supply storage. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY 87 are estimated at $188,000; total 
cumulative flood damages prevented are estimated at 
$4,933,000. During the year 664 acre-feet of water supply 
storage were withdrawn by Tr-Lakes Water District. 
Condition at end of fiscal year. Construction began 
in June 1968. The embankment closure was made on May 
8, 1975 and the project placed in useful operation. 
18-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
24. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Approved regulations for operation and maintenance 
of flood control works, Part 208 of Title 33, Code of 
Federal Regulations, provide for periodic inspection of 
completed projects transferred to local interests for 
operation and maintenance. Inspections of local flood 
protection projects were made to determine extent of 
compliance with approved regulations for maintenance 
and operation of these projects. Responsible officials of 
improvement districts concerned were advised of inadequacies 
in maintenance and operation of local flood 
protection works under their jurisdiction where appropriate. 
Cost for fiscal year was $70,528. Total cost 
through September 30, 1987, was $1,104,926. 
25. LITTLE MASSARD CREEK, 
FORT SMITH, AR 
Location. In southeast Fort Smith, near Highway 22 
and East of 1-540, Sebastian County, AR. 
Existing project. The flood damage reduction project 
consists of a 30-foot width earthen channel between river 
mile 1.104 and 1.49 and alteration of the 91st Street 
bridge over Little Massard Creek. 
Local cooperation. Fully complied with. 
Operations and results during the fiscal year. An 
O&M manual was prepared and furnished the city of 
Fort Smith. 
Condition at end of fiscal year. Construction began 
in 1983 and the city of Fort Smith assumed operation and 
maintenance of the project in July 1984. 
26. LITTLE RED RIVER AND 
TRIBUTARIES, CLINTON, AR 
Location. In Clinton, Van Buren County, AR, along 
the tributaries of the Little Red River. The city lies 
between the tributaries of Archey Fork and South Fork 
and is bisected by Town Branch. 
Existing project. The flood damage reduction project 
consists of 100-foot bottom-width channel for 1.35 miles 
on Archey Fork Creek and a 30(0-foot bottom-width 
channel for 1.99 miles on South Fork, Little Red River. 
Local cooperation. Fully complied with. 
Operations and results during the fiscal year. An 
O&M manual was prepared and furnished the city of 
Clinton. Mitigation measures to compensate for damages 
to the walleye pike fishery are being coordinated with the 
U.S. Fish and Wildlife Service and the Arkansas Game 
and Fish Commission. 
Condition at end of fiscal year. Construction of the 
project began in 1985 and was transferred to the city of 
Clinton in August 1986 for operation and maintenance. 
27. LITTLE RIVER BASIN 
(LITTLE ROCK DISTRICT), AR 
Location. Improvements are on Little River and 
tributaries, Arkansas. More definite location of individual 
items is shown in Table 18-J, Little River Basin. 
Existing project. Part of a six-lake system for flood 
control and other purposes in the Little River Basin. The 
system consists of four lakes in Arkansas: Millwood on 
the main stem, Dierks on the Saline River, DeQueen on 
the Rolling Fork River, and Gillham on the Cossatot 
River, and two lakes in Oklahoma: Broken Bow on the 
Mountain Fork River and Pine Creek on the Little River. 
Under a District boundary change, effective in October 
1980, the four projects in this system in Arkansas were 
reassigned from the Tulsa District to the Little Rock 
District. 
Local cooperation. Section 2, Flood Control Act of 
1938, and Section 301, Water Supply Act of 1958, as 
amended, apply. Tri-Lakes (DeQueen, Gillham, and 
Dierks) Water District furnished a resolution of intent to 
repay costs allocated to water supply storage. The Southwest 
Arkansas Water District is currently repaying costs 
allocated to water supply storage at Millwood Lake. 
Operations and results during fiscal year. Operation 
and maintenance of projects continued. See individual 
projects for details. 
Condition at end of fiscal year. Millwood, DeQueen, 
Gillham, and Dierks Lakes are complete and in operation. 
28. MILL CREEK, FORT SMITH, AR 
Location. In southwest Fort Smith, Sebastian 
County, AR. 
Existing project. The detailed project report was 
approved December 5, 1985. The plan of improvement 
consists of improving 3.9 miles of the Mill Creek channel 
and modifying six bridges. The estimated project cost is 
$6,833,000: $3,820,000, Federal; $3,013,000, non-Federal. 
The study, which began under the General Investigations 
Program, has been shifted to the Continuing 
Authority Program due to the size of the project. 
Local cooperation. Section 3, Flood Control Act of 
June 22, 1936, applies. 
Operations during the fiscal year. Plans and specifications 
are being prepared. 
29. MILLWOOD LAKE, AR 
Location. On Little River, river mile 16.0, approximately 
7 miles east of Ashdown, Little River County, 
AR, and about 2 miles northeast of Millwood, Little River 
County, AR. (See Geological Survey map for Red Bluff, 
AR, quadrangle, scale 1:24,000.) 
Existing project. For description of completed improvement 
and authorizing legislation see Annual Report 
for 1969 (Tulsa District). Federal cost of project is 
$46,100,082. (See Table 18-B for authorizing legislation.) 
Local cooperation. Completed as required. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. A total of 53,944 
acre-feet of water was released from the lake for water 
supply to Southwest Arkansas Water District. Estimated 
monetary benefits attributed to Millwood Lake 
18-6

LITTLE ROCK, AR, DISTRICT 
for prevention of flood damages for the fiscal year were 
$246,000, for a total of $6,402,000 to September 30, 1987. 
Condition at end of fiscal year. Construction began 
in September 1961 and the project was placed in full 
flood control operation in August 1966. Work required to 
complete project consists of additional recreational facilities 
under the cost sharing program. 
30. NIMROD LAKE, AR 
Location. See Table 18-I, Arkansas River Basin, AR, 
OK, and KS: Lakes. 
Existing project. Estimated cost is $4,005,627. For 
further information see pages 908 and 909 of 1962 
Annual Report. For authorization see Table 18-B. 
Local cooperation. Section 2, Flood Control Act of 
1938 applies. 
Operations and results during fiscal year. Operation 
and maintenance of project continued. Addition and 
improvement to existing recreation sanitary facilities 
continued. Flooding was prevented on an average of 
1,978 acres of improved land during fiscal year. 
Estimated monetary benefits at end of fiscal year 
attributed to Nimrod Lake for prevention of flood damages 
were $308,000, for a total of $11,870,000 through 
September 1987. Ninety-two acre-feet of water were 
withdrawn by the city of Plainview, AR, from Nimrod 
Lake. 
Condition at end of fiscal year. Project is complete 
except for addition and improvement to existing sanitary 
recreation facilities. Construction of project began in 
January 1940 and was ready for beneficial use in 
January 1942. 
31. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See Table 18-E, Other Authorized Flood Control 
Projects. 
32. OTTER CREEK AND 
TRIBUTARIES, 
SHANNON HILLS, AR 
Location. In Shannon Hills, Saline County, about 10 
miles southwest of Little Rock, AR. 
Existing project. The flood damage reduction project 
consisted of construction of a 50-foot channel upstream of 
Beechwood Street to about 2,000 feet downstream of the 
corporate limits, and the replacement of the bridge at 
Shannon Hills Drive in the community of Shannon Hills. 
Local cooperation. Fully complied with. 
Operations and results during the fiscal year. An 
O&M manual was prepared and furnished the city of 
Shannon Hills. 
Condition at the end of the fiscal year. Construction 
began in 1984 and the city of Shannon Hills assumed 
operation and maintenance of the project in December 
1985. 
33. WHITE RIVER BASIN 
(LITTLE ROCK DISTRICT), 
AR & MO 
Location. Improvements are on White River and 
tributaries, Arkansas and Missouri. More definite location 
of individual items is shown in Table 18-K, White 
River Basin. 
Existing project. A general comprehensive plan for 
flood control and other purposes in White River Basin. 
Plan now includes seven lakes, of which two are flood 
control only projects and five are multiple-purpose 
projects. Beaver, Table Rock, Bull Shoals, Norfork, 
Clearwater, Greers Ferry and Bell Foley lakes were 
selected and approved for construction by Chief of 
Engineers, and individual reports on six of these seven 
lakes are presented on subsequent pages. Bell Foley lake 
was reclassified to inactive in June 1977; reviewed for the 
purpose of deauthorization and placed in a deferred 
status in May 1985. Lakes in plan are listed in Table 
18-K, White River Basin. For authorization see Table 
18-B. 
Local cooperation. Section 2, Flood Control Act of 
1938 applies, Water Supply Act of 1958, as amended, 
applies to Beaver, Greers Ferry, and Norfork. 
Operations and results during fiscal year. Operation 
and maintenance of projects continued. Estimated 
monetary flood control benefits attributed to Beaver, 
Table Rock, Bull Shoals, Norfork, Greers Ferry, and 
Clearwater lakes for FY 87 totaled $9,870,000. A 
cumulative total of flood damages prevented by the 
lakes through September 30, 1987, is estimated at 
$279,020,000. 
Electric energy delivered to Southwestern Power 
Administration for marketing during the fiscal year 
totaled 1,385,979,700 kilowatt-hours. 
Water releases for fish hatcheries were: 28,960 acrefeet 
from Norfork Lake for Fish and Wildlife Service 
trout hatchery, 14,480 acre-feet from Table Rock Lake 
for Missouri Conservation Commission trout hatchery, 
and 14,480 acre-feet from Greers Ferry Lake for U.S. 
Fish and Wildlife Service trout hatchery. 
Withdrawals for water supply purposes were: Beaver 
Water District, 31,165 acre-feet from Beaver Lake; 
Water and Sewer Improvement District No. 3 of Mountain 
Home, AR, 2,430 acre-feet from Norfork Lake; the 
Community Water System, Cleburne County, AR, and 
the city of Clinton, AR, 1,856 acre-feet from Greers Ferry 
Lake. 
Condition at end of fiscal year. Beaver, Table Rock, 
Bull Shoals, Norfork, Clearwater, and Greers Ferry 
lakes are complete and in operation. Progress on these 
lakes is in individual reports. Bell Foley lake project has 
been placed in a deferred status. Water Valley and Lone 
Rock lakes have been deauthorized. 
34. WHITE RIVER, 
JACKSONPORT, AR 
Location. In the west-central part of Jackson County 
at Jacksonport, about 2 miles northwest of Newport at 
18-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
the confluence of the White and Black Rivers. 
Existing project. The flood damage reduction project 
consists of raising 5.1 miles of the existing levee and 
extending it about 1.4 miles to high ground to provide an 
approximate 100-year level of protection plus 3 feet of 
free board. 
Local cooperation. Fully complied with. 
Operations and results during the fiscal year. An 
O&M manual was prepared and furnished the city of 
Jacksonport. 
Condition at the end of fiscal year. Construction of 
the project began 1984 and the city of Jacksonport 
assumed operation and maintenance of the project in 
April 1986. 
Multiple-Purpose Projects Including Power 
35. BEAVER LAKE, AR 
Location. See table 18-K. White River Basin. 
Existing project. Estimated cost is $50,797,000. For 
further information see pages 788 and 789 of 1966 
Annual Report. For authorization see Table 18-B. 
Local Cooperation. Section 2, Flood Control Act of 
1938 and Water Supply Act of 1958, as amended, apply. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY 87 are estimated at $1,255,000; total 
cumulative flood damages prevented are estimated at 
$20,291,000. During the year, 155,106,700 kilowatt-hours 
of electrical energy were delivered to the Southwestern 
Power Administration for marketing. Water supply 
storage withdrawn during the year was 31,165 acre-feet. 
Condition at end of fiscal year. Project is complete 
except for addition and improvement to existing recreation 
sanitary facilities. Construction of project began in 
October 1959 and was placed in operation for flood 
control in December 1963, hydroelectric power generation 
with both units in May 1965, and water supply in 
January 1966. Since the dam was constructed there has 
been a seepage problem below Dike No. 1. Based on 
detailed investigation, it was determined that the limestone 
foundation under Dike No. 1 and 200 feet of the 
north end of the main dam embankment is the main 
problem. The plan of improvement is a concrete seepage 
cutoff in Dike No. 1 and the north end of the main dam. 
36. BULL SHOALS LAKE, AR 
Location. See Table 18-K, White River Basin, AR & 
MO. 
Existing project. Estimated cost with eight generating 
units is $96,356,000. For further information see 
pages 725 and 726 of 1965 Annual Report. For authorization 
see Table 18-B. 
Local cooperation. Section 2, Flood Control Act of 
1938 applies. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY 87 are estimated at $5,100,000; total 
cumulative flood damages prevented are estimated at 
$84,088,000. During the year, 566,883,000 kilowatthours 
of electrical energy were delivered to Southwestern 
Power Administration for marketing. 
Condition at end of fiscal year. Project is complete 
except for addition and improvement to existing recreation 
sanitary facilities. Construction of project began in 
April 1946 and was ready for beneficial use for flood 
control in June 1951 and generation of electrical energy 
in September 1952. Units 1 through 8 were placed in 
operation September 1952, September 1952, December 
1952, June 1953, January 1962, February 1962, August 
1963, and September 1963, respectively. 
37. DARDANELLE LOCK AND DAM 
(NO. 30), AR 
Location. See Table 18-H, Arkansas River Basin; AR, 
OK, and KS: Navigation. 
Existing project. Project is a unit of McClellan-Kerr 
Arkansas River Navigation System. Dam is 2,683 feet 
long and 68 feet high. It has a spillway with 20 tainter 
gates 50 feet long and 39 feet high. Navigation lock is 110 
by 600 feet with a lift of 54 feet. Powerhouse contains four 
31,000 kilowatt generators. Lake has a storage capacity 
of 486,200 acre-feet. Estimated cost is $86,507,000. (See 
Table 18-B for authorizing legislation.) 
Local cooperation. See Section 1. 
Operations and results during fiscal year. Continued 
operation and maintenance. Pool fluctuated within 
2-foot power pondage, elevation 336.0 to 338.0. Power 
generation continued. During FY 87, 831,194,100 kilowatt-
hours of electrical energy were delivered to the 
Southwestern Power Administration for marketing. 
Condition at end of fiscal year. Project is complete 
except for addition and improvement to existing recreation 
sanitary facilities. Construction began June 1957. 
Power units were placed on line April, May, and September 
1965, and January 1966. Lock was placed in 
operation in December 1969. Lock was unwatered, inspected, 
and repaired September 14-23, 1981. Information 
Center and resident office were completed in FY 85. 
38. GREERS FERRY LAKE, AR 
Location. See table 18-K, White River, AR & MO. 
Existing project. Estimated cost is $55,125,000. For 
further information see page 740 of 1964 Annual Report. 
(See Table 18-B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 
1938 and Water Supply Act of 1958, as amended, apply. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY 87 are estimated at $256,000; total 
cumulative flood damages prevented are estimated at 
$17,032,000. During the year, 105,292,600 kilowatthours 
of electrical energy were delivered to the Southwestern 
Power Administration for marketing. Water 
18-8

LITTLE ROCK, AR, DISTRICT 
supply storage withdrawn during the year was 1,856 
acre-feet. 
Condition at end of fiscal year. Project is complete 
except for addition and improvement to existing recreation 
sanitary facilities. Construction of project began in 
June 1957, was ready for beneficial use for flood control 
in January 1962, and power units 1 and 2 were placed in 
operation in March and May 1964, and water supply was 
placed in operation in April 1971. The visitors center was 
completed in June 1984 at a cost of $922,340. 
39. NORFORK LAKE, AR 
Location. See Table 18-K, White River Basin, AR 
& MO. 
Existing project. Total estimated cost is $111,624,000, 
including $38,700,000 for addition of power units 3 and 4, 
and $40,000,000 for highway bridge construction. For 
further information see page 896 of 1962 Annual Report. 
(See Table 18-B for authorizing legislation.) 
Local cooperation. Section 2, Flood Control Act of 
1938 and Water Supply Act of 1958, as amended, apply. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY 87 are estimated at $245,000; total 
cumulative flood damages prevented are estimated at 
$30,094,000. During the year, 126,506,400 kilowatthours 
of electrical energy were delivered to the Southwestern 
Power Administration for marketing. Water 
supply withdrawn by city at Mountain Home, AR, 
totaled 2,430 acre-feet. 
Condition at end of fiscal year. Project is complete 
except for addition and improvement to existing recreation 
sanitary facilities, and addition of power units 3 and 
4. Construction of project began in October 1940, ready 
for beneficial use for flood control in June 1943, and for 
generation of electrical energy with one unit in June 
1944. Second unit was added in February 1950. Water 
supply was added as a purpose in December 1969. 
Construction of two highway bridges over Norfork Lake 
to replace ferries was completed in November 1982. The 
bridges were transferred to the Arkansas Highway and 
Transportation Department for operation and maintenance 
in July 1984. 
40. OZARK-JETA TAYLOR LOCK AND 
DAM (NO. 12), AR 
Location. See Table 18-H, Arkansas River Basin, AR, 
OK, and KS: Navigation. 
Existing project. Project is a unit of McClellan-Kerr 
Arkansas River Navigation System. Dam is 2,480 feet 
long and 58 feet above streambed. It has a spillway with 
15 tainter gates 50 feet long and 46 feet high. Navigation 
lock is 110 by 600 feet with a lift of 34 feet. Powerhouse 
contains five 20,000 kilowatt generators. Lake has a 
storage capacity of 148,400 acre-feet. In addition, 1 foot of 
power pondage is provided in Pool No. 13 between 
elevations 391.0 and 392.0. Estimated cost is 
$86,167,000. For authorization see Table 18-B. 
Local cooperation. See Section 1. 
Operations and results during fiscal year. Delivered 
341,104,500 kilowatt-hours of electrical energy to Southwestern 
Power Administration for marketing. Continued 
operation and maintenance. 
Condition at end of fiscal year. Construction began 
in December 1964. Project is complete except for addition 
and improvement to existing recreation sanitary 
facilities. Lock and dam was placed in operation in 
November 1969. Power units were placed on line as 
follows: Unit 1, November 1972; unit 2, August 1973; unit 
3, October 1973; unit 4, December 1973, and unit 5, May 
1974. Work remaining consists principally of modifications 
to powerplant. 
41. TABLE ROCK LAKE, MO 
Location. See Table 18-K, White River Basin, AR & 
MO. 
Existing project. Estimated cost is $71,233,000. For 
further information see page 893of 1962 Annual Report. 
For authorization see Table 18-B. 
Local cooperation. Section 2, Flood Control Act of 
1938 applies. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY 87 are estimated at $3,014,000; total 
cumulative flood damages prevented are estimated at 
$52,743,000. During the year 432,191,000 kilowatt-hours 
of electrical energy were delivered to the Southwestern 
Power Administration for marketing. 
Condition at end of fiscal year. Project is complete 
except for addition and improvement to existing recreation 
sanitary facilities. Construction of project began in 
October 1954, was ready for beneficial use for flood 
control in November 1958, and for generation of electrical 
energy with units 1 and 2 in May 1959. Units 3 and 
4 were added in April and June 1961. 
General Investigations 
42. SURVEYS 
Fiscal year costs were $544,612: $17,426, navigation 
studies; $375,657, flood damage prevention studies; 
$10,776, comprehensive studies; $1,437, review of completed 
project; $37,946, special investigations; $3,000, 
review of FERC licenses; $98,370, coordination studies 
with other agencies. 
43. COLLECTION AND STUDY OF 
BASIC DATA 
Costs for these services for the fiscal year were 
$211,990. 
Flood plain management services (FPMS). The 
authority for the FPMS program is Section 206 of the 
1960 Flood Control Act, PL 86-645, as amended. 
Through technical services and planning guidance, the 
18-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
program encourages comprehensive flood plain management 
planning at all levels to reduce the potential for 
losses to life and property from floods. Federal and non- 
Federal agencies and the private sector are assisted with 
planning and development information for flood hazard 
areas. This assistance is in the form of local flood plain 
regulations, Federal Insurance Program requirements, 
and Executive Order 11988 guidelines. Such assistance 
may include factual flood information (available or 
determined) and interpretation on flood frequencies, 
extent of flooding, flood-water velocity, duration of flooding 
and floodway limits. Services accomplished during 
fiscal year: Technical services and planning guidance 
responses furnished during FY 87 totaled 19,100. This 
total included services to Federal and non-Federal agencies, 
individuals, realtors, corporations, lending institutions, 
engineers, architects, and others. Costs for providing 
these services during FY 87 totaled $209,863. 
Hydrologic studies. During the fiscal year, 109 stations 
were operated, 72 cooperatively with USGS and 37 
by the Corps. The total cost for streamflow and some 
sediment data from all sources of funding for FY 87 was 
$513,410, of which $377,400 was transferred to USGS. 
The District also participated in a cooperative program 
with National Weather Service for rainfall and/or river 
reporting stations for use in forecasting streamflow for 
flood warning and operation of lake projects. Records 
were also collected at certain hydroclimate rainfall 
stations under a cooperative program between the two 
agencies. For these services, $38,000 was transferred to 
the National Weather Service. 
44. CONTINUATION OF PLANNING 
AND ENGINEERING 
During this fiscal year, a total of $122,153 was expended: 
Fourche Bayou - vicinity of Little Rock, AR 
($54,713), and North Little Rock (Dark Hollow), AR 
($67,440). 
18-10

LITTLE ROCK, AR, DISTRICT 
TABLE 18-A COST AND FINANCIAL STATEMENT1 ,23, 
See 
Section Total to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 19872 
1. Arkansas River 
Basin, Ark., 
Okla., & Kans. 
3. Bank Stabilization 
& Channel 
Rectification, AR 
2, 4-5, Navigation 
7-10, 12, Locks & Dams, 
14, 16. AR 
6. Little Rock Slackwater 
Harbor, AR 
17. Blue Mountain 
Lake, AR 
18. Clearwater 
Lake, MO 
New Work 
Approp. 
Dams 
Navigation 
Cost 
Dams 
Navigation 
Maint. 
Approp. 
Dams 
Navigation 
Cost 
Dams 
Navigation 
Rehab. 
.Approp. 
Cost. 
New Work 
Contrib. 
Cost 
Special Funds 
Cost 
Other 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost. 
Other 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
$ 2,144,000 
-72,000 
2,216,000 
2,456,752 
71,746 
2,385,006 
40,244,566 
8,849,697 
31,394,869 
42,894,970 
8,881,670 
34,013,300 
3,450,000 
3,450,000 
2,464,283 
7,366 
2,456,917 
52,292,456 
10,730,500 
41,561,956 
53,144,241 
10,637,899 
42,506,342 
$ 971,000 
971,000 
1,072,738 
1,072,738 
51,802,900 
11,478,700 
40,324,200 
56,383,991 
12,196,588 
44,187,403 
$ 3,346,000 $1,464,552,127 
- 150,318,533 
3,346,000 1,314,233,594 
4,400,979 1,463,863,707 
- 150,279,504 
4,400,979 1,313,589,203 
53,820,069 653,804,8483 
11,386,703 144,242,993 
42,433,366 509,561,855 
54,463,823 656,253,7153 
11,676,676 144,182,613 
42,792,147 512,071,102 
- 291,106 
- 291,106 
- 1,609,842 
- 1,609,842 
- 19,926,755 
- 19,926,755 
- 531,336 
- 531,336 
- 119,300,184 
- 119,300,184 
- 4,561,666 
- 4,561,666 
2,220,000 
2,331,168 
12,302,000 
15,282,239 
2,600,000 493,000 3,154,000 425,176,473 
2,419,272 785,392 3,614,165 425,031,413 
11,466,000 12,237,000 18,739,150 205,942,9523 
16,019,197 15,261,530 18,913,983 208,482,1603 
- - - 973,385 
- - - 963,567 
- - - 531,336 
- - - 531,336 
- 110,000 842,000 
- 103,970 790,062 
952,0004 
894,0324 
- - - - 5,069,974 
- - - - 5,069,974 
627,000 656,000 624,000 701,722 10,522,0163 
675,029 652,016 636,896 693,553 10,506,7303 
- - - - 10,453,403 
- - - - 10,440,204 
1,469,000 1,342,000 1,419,000 1,540,922 22,088,4443 
1,633,639 1,366,720 1,391,455 1,555,704 22,073,84T7 
18-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 18-A (Continued) COST AND FINANCIAL STATEMENT 1,23, 
See 
Section 
in Text Project Funding FY 84 FY 85 FY 86 
Total to 
FY 87 Sept. 30, 19872 
19. DeQueen Lake, 
Little River 
Basin, AR 
20. Dierks Lake, 
Little River 
Basin, AR 
22. Fourche Bayou 
(Little Rock Dist.) 
23. Gillham Lake, 
Little River 
Basin, AR 
25. Little Massard Crk, 
Fort Smith, AR 
(Contributed Funds) 
26. Little Red River & 
Tributaries, 
27. Little River Basin, 
(Little Rock Dist.) 
28. Mill Creek, Fort 
Smith, AR 
29. Millwood Lake, 
Little River 
Basin, AR 
30. Nimrod Lake, 
AR 
32. Otter Creek & 
Tributaries, 
Shannon Hills, AR 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approx. 
Cost 
New York 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
-1,100
37 
515,000 
585,145 
14,770 
510,000 
595,000 
686,000 
634,524 
-1,600 
2,006 
495,000 
642,099 
77,400 
95,000 
77,725 
(1,456,000) 
92,952 
-2,700 
56,371 
3,513,000 
4,181,253 
39,558 
1,993,000 
2,358,113 
147 
705,000 
747,627 
(70,000) 
147,126 
671,000 809,000 
674,275 805,368 
195 
685,000 
721,135 
685,000 
683,107 
624,000 
649,813 
300,000 
297,042 
626,000 816,000 
574,264 841,872 
- 18,096 
1,138 339 
1,060,000 2,550,000 
777,727 2,815,619 
7,835 1,127 
3,539,500 3,336,000 
3,577,991 3,632,464 
- 162,000 
- 99,493 
7,640 
1,557,500 
1,608,317 
1,127 
1,323,600 
1,335,411 
812,000 922,000 
820,871 914,350 
- (24,796) 
10,050 - 
- 19,629,753 
- 19,623,752 
691,400 5,799,4303 
713,943 5,793,9333 
- 16,002,904 
- 16,002,781 
697,300 6,178,0033 
707,478 6,177,7203 
360,000 2,031,00@0 
343,750 1,958,4233 
- 17,827,111 
- 17,826,703 
766,722 5,387,2073 
814,460 5,383,1843 
- 110,0964 
-8,453 71,5454 
-5,775 89,225 
11,499 89,225 
- 3,911,50@ 
- 3,686,2985 
- 99,959,850 
- 99,544,384 
3,865,144 38,201,4243 
3,945,354 38,117,3913 
90,000 252,0004 
122,848 222,3414 
- 46,087,3823 
- 46,091,1483 
1,709,722 20,573,165 
1,712,473 20,765,5543 
- 4,092,826 
- 4,005,627 
916,722 12,386,165 
909,774 12,360,4883 
- 239,7045 
5,000 162,2044 
18-12 
_ __ _

LITTLE ROCK, AR, DISTRICT 
TABLE 18-A (Continued) COST AND FINANCIAL STATEMENT 1,23a, 
See 
Section Total to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 19872 
33. White River 
Basin (Little 
Rock District) 
34. White River, 
Jacksonport, AR 
35. Beaver Lake, 
AR 
36. Bull Shoals 
Lake, AR 
37. Dardanelle Lock 
& Dam (No. 10), 
AR 
38. Greers Ferry 
Lake, AR 
39. Norfork Lake, 
AR 
40. Ozark-Jeta Taylor 
Lock & Dam (No. 
12), AR 
41. Table Rock 
Lake, MO 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
20,700 
936,207 
15,455,000 
16,641,871 
(616,000) 
82,901 
-4,300 
3,933 
2,200,000 
2,326,174 
- - - 335,031,873 
288,799 160,297 9,005 334,758,666 
16,366,500 15,961,000 20,126,632 255,393,1113 
16,875,975 18,584,487 20,196,826 257,740,5323 
- 948,000 - 2,770,5005 
864,801 1,579,228 8,627 2,770,5005 
- - - 46,183,033 
4,039 - - 46,112,072 
2,555,500 3,043,600 3,416,922 34,591,3513 
2,563,211 3,082,886 3,382,140 34,516,7803 
- - - - 88,858,711 
- - - - 88,858,707 
3,386,000 3,889,500 4,754,600 4,435,922 54,345,2753 
3,625,680 4,210,600 4,754,193 4,430,634 58,850,1723 
- - - - 84,270,124 
- - - - 84,261,240 
3,198,000 3,541,000 3,751,000 4,284,300 47,788,1693 
3,372,791 3,575,685 3,633,834 4,425,056 47,686,1843 
- - - - 48,865,512 
77,853 - - - 48,865,512 
3,061,000 3,197,500 3,745,600 3,832,922 46,491,0603 
3,230,760 3,256,122 3,716,466 3,886,414 46,421,6833 
25,000 
847,235 - 159,899 
- 159,899 - 70,997,929 
378 70,716,087 
2,264,000 2,238,500 2,423,600 2,537,022 41,875,2133 
2,394,031 2,310,590 2,442,185 2,547,120 41,738,0213 
- - - - 85,629,412 
89 - - - 85,629,412 
2,923,000 2,608,000 2,295,000 3,526,400 39,117,8783 
3,537,134 2,839,221 2,322,962 3,525,398 39,092,2203 
- - - - 67,224,000 
19,330 - - - 67,224,000 
3,075,000 3,143,500 3,229,600 4,362,922 54,176,2883 
3,431,587 3,168,732 3,197,302 4,394,814 54,127,1503 
1. For more details on project funds, see text for individual projects. 
2. Includes funds (total cumulative amount $3,839,700 (excluding $236,700 expended for Continuing Authority projects)) provided in the 
Jobs Act (P.L. 98-8, March 24, 1983) for projects listed in Table 18-M of FY 85 Annual Report. 
3. Beginning data shown in Table 18-A includes special recreation use fees. Data for previous fiscal years have been changed to conform to the 
new procedure. 
4. Includes funds for plans and specifications. 
5. Includes total project funds. 
18-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 18-B AUTHORIZING LEGISLATION 
Date of 
Authorizing Act Project and Work Authorized Documents 
June 28, 1938 
August 18, 1941 
July 24, 1946 
July 24, 1946 
June 30, 1948 
May 17, 1950 
July 14, 1960 
November 17, 1986 
June 30, 1948 
July 14, 1960 
June 10, 1948 
June 30, 1948 
ARKANSAS RIVER BASIN, AR, OK, & KS 
(See Section 1 of Text) 
Approved General comprehensive plan: 
Mannford Reservoir, OK 
Oologah Lake, OK 
Canton Lake, OK 
Tenkiller Ferry Lake, OK 
Wister Lake, OK 
Blue Mountain Lake, AR 
Nimrod Lake, AR 
Modified comprehensive plan to include reservoirs in 
Grand (Neosho) River Basin, OK, and MO, and in 
Verdigris River Basin: 
Markham Ferry Reservoir, OK 
Fort Gibson Lake, OK 
Pensacola Reservoir Lake O' The Cherokees, OK 
Fall River Lake, KS 
Elk City Lake, KS 
Toronto Lake, KS 
Neodosha Lake, KS 
Authorized Chief of Engineers to provide in the Canton 
Lake 69,000 acre-feet of irrigation storage, subject to 
certain conditions. 
Approved multiple-purpose plan: 
Oologah Lake, OK 
Markham Ferry Reservoir, OK 
Fort Gibson Lake, OK 
Blackburn Reservoir, OK 
Mannford Reservoir, OK 
Taft Reservoir, OK 
Bank stabilization 
Dardanelle Lock and Dam, AR 
Eufaula Lake, OK 
Navigation locks and dams 
Ozark Lock and Dam, AR 
Short Mountain Lock and Dam, OK 
Webbers Falls Lock and Dam, OK 
Tenkiller Ferry Lake, OK 
Modified Arkansas River navigation comprehensive plan to 
include bank protection works at Bradens Bend, OK. 
Modified comprehensive plan authorized in 1938 Flood 
Control Act and multiple-purpose plan authorized in 
River and Harbor Act of 1946 to provide for substituting 
Keystone Lake for Mannford, Blackburn and Taft 
Reservoirs. 
Authorized incorporation of River and Harbor and Flood 
Control plans into a single plan of development and made 
all previous authorizations applicable to combined 
plan of development. 
Fourche Bayou Basin, Little Rock, AR 
(See Section 22 of Text.) 
Massard Creek, Fort Smith, AR 
(See Section 25 of Text.) 
Little Rock Slackwater Harbor, Arkansas River, 
Little Rock, AR (See Section 6 of Text.) 
Mill Creek Fort Smith, AR 
(See Section 28 of Text.) 
Otter Creek and Tributaries, Shannon Hills, AR. 
(See Section 32 of Text.) 
18-14 
Flood Control Conm. 
Doc. 1, 75th Cong., 
1st sess. 
H. Doc. 107 and 440, 
76th Cong. 1st sess. 
H. Doc. 758, 79th Cong., 
2d sess. 
S. Doc. 107, 81st Cong., 
1st sess. 
Water Resources 
Development Act of 
1986, P.L. 99-662, 
Sec. 401 
Section 205, P.L. 80-858. 
Authorized by Chief of 
Engineers 
Section 107, P.L. 86-645. 
Authorized by Chief of 
Engineers 
Section 205, P.L. 80-858. 
Authorized by Chief of 
Engineers 
Section 205, P.L. 80-858. 
Authorized by Chief of 
Engineers

LITTLE ROCK, AR, DISTRICT 
TABLE 18-B (Continued) AUTHORIZING LEGISLATION 
Date of 
Authorizing Act Project and Work Authorized 
July 24, 1946 
July 3, 1958 
June 28, 1938 
August 18, 1941 
September 3, 1954 
October 23, 1962 
March 1, 1974 
June 30, 1948 
October 22, 1976 
June 30, 1948 
RED RIVER BELOW DENISON DAM INCLUDING 
LITTLE RIVER BASIN, OK AND AR 
(See Section 27 of Text) 
Construct Boswell, Hugo, and Millwood Lakes, and Bank 
Stabilization. 
Modified Millwood: Construct Pine Creek, Lukfata, 
Broken Bow, DeQueen, Gillham, Dierks Lakes 
WHITE RIVER BASIN (LITTLE ROCK DISTRICT) 
(See Section 33 of Text) 
Approved comprehensive plan for White River Basin: 
Lone Rock Lake, AR, Norfork Lake, AR, 
Clearwater Lake, MO, Water Valley Lake, AR, 
Bell Foley Lake, AR, Greers Ferry Lake., AR, 
and White River emergency. 
Modified comprehensive plan to include Bull Shoals 
Lake, AR, and MO, Table Rock Lake, MO, and 
AR, and Norfork Lake, AR, and MO (power). 
Authorized power in Greers Ferry Reservoir and added 
Beaver Lake to the plan. 
Authorizing clearing and straightening of channel for 
Village Creek, Jackson and Lawrence Counties. 
Authorizing highway bridge construction across 
Norfork Lake. 
Little Red River and Tributaries, 
Clinton, AR (See Section 26 of Text.) 
White River Fish Hatchery, Arkansas provides for 
trout production facilities downstream from 
Beaver Dam. 
White River, Jacksonport, AR. 
(See Section 34 of Text.) 
H. Doc. 602, 79th Cong., 
2d sess. 
H. Doc. 170, 85th Cong., 
1st sess 
Flood Control Conm. 
Doc. 1, 75th Cong., 
1st sess. 
H. Doc. 917, 76th Cong., 
3d sess. 
H. Doc. 290, 77th Cong., 
1st sess. 
H. Doc. 499, 83d Cong. 
2d sess. 
H. Doc. 352, 87th Cong., 
2d sess. 
Flood Control Conm. 
Doc. 1, 75th Cong., 
1st sess. 
Section 205, P.L. 80-858. 
Authorized by Chief of 
Engineers 
Water Resources 
Development Act of 
1976, P.L. 94-587, 
Sec. 105 
Section 205, P.L. 80-858. 
Authorized by Chief of 
Engineers 
18-15 
Documents 
__ ~ 
__ ~ 
I

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 18-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sept. 30, 1987 
Full Report 
See Annual Operation and 
Project Report For Construction Maintenance 
Black River, AR, and MO ' 1950 $ 80,000 $ 930,324 
Current River, AR, and MO ' 1964 17,0002 132,178 
Upper White River, AR 3 4 1952 813,197 1,788,374 
White River, AR, (above Peach 
Orchard Bluff)' 5 1950 - 785,666 
1. Channel adequate for existing commerce. Completion 
not contemplated. 
2. Includes $7,000 for previous project. 
3. Federal operation and maintenance terminated June 
30, 1952, due to lack of commerce. Facilities at Locks and Dams 
Nos. 1, 2, and 3 disposed of in accordance with authority in 
Public Law 996, 84th Cong. 
4. Completed. 
5. Responsibility for maintenance of project downstream 
from Newport, AR, transferred to Memphis District in FY 62. 
18-16

LITTLE ROCK, AR, DISTRICT 
TABLE 18-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sept. 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Bell Foley Lake, White River, AR' Inactive 1975 $1,407,116 - 
Black River, Butler County Road 607, MO Completed 1985 44,500 - 
Black River, Poplar Bluff, MO, to 
Knobel, AR Completed 1958 584,315 - 
Carden's Bottom Drainage District No. 2, 
Arkansas River, AR Completed 1951 919,955 - 
Clarksville, AR Completed 1962 271,717 - 
Conway County Drainage and Levee District 
No. 1, Arkansas River, AR Completed 1959 187,440 - 
Conway County Levee Districts Nos. 1, 
2, and 8, Arkansas River, AR Completed 1952 1,018,840 - 
Conway County Levee District No. 6, 
Arkansas River, AR Completed 1952 390,952 - 
Crawford County Levee District, Arkansas 
River, AR Completed 1954 2,001,820 - 
Curia Creek Drainage District, Independence 
County, AR Completed 1983 117,899 - 
East Poplar Bluff and Poplar Bluff, MO Completed 1958 304,699 - 
Faulkner County Levee District No. 1, 
Arkansas River, AR Completed 1941 99,511 - 
Fort Smith, Arkansas River, AR Completed 1951 1,077,546 - 
From North Little Rock to Gillett, AR 
(above Plum Bayou) Completed 1954 845,300 - 
Fourche Creek, Little Rock, AR 2 Cancelled 1973 22,890 - 
Jackson County Levee District 2, White River, 
AR Completed 1986 131,699 - 
Little Red River, White County Road Bridge, 
Judsonia, AR Completed 1983 63,355 - 
Little Rock Levee, AR, East End 
Fourche Bayou Completed 1975 1,901,899 - 
McLean Bottom Levee District No. 3, 
Arkansas River, AR Completed 1950 422,549 - 
Near Dardanelle, Arkansas River, AR Completed 1953 198,069 - 
Newport, White River, AR Completed 1941 314,276 - 
North Little Rock, Arkansas River, AR Completed 1958 512,001 - 
Petit Jean River, AR Completed 1966 84,350 - 
Pine Mountain Lake, AR Inactive 1985 1,432,331 - 
Point Remove Levee and Drainage District, 
Conway County, AR Completed 1983 86,943 - 
Roland Drainage District, Arkansas River, 
AR Completed 1950 269,907 - 
Rolling Fork River, Sevier County, AR Completed 1983 64,500 - 
Skaggs Ferry, Black River, AR Completed 1941 81,023 - 
South Bank Arkansas River (Head Fourche 
Island to Pennington Bayou), AR Completed 1964 1,404,852 - 
South Bank, Arkansas River, Little Rock to 
Pine Bluff, AR, Tucker Lakes Completed 1961 409,115 - 
Swan Creek Bank Stab., Taney County, MO Completed 1986 76,800 - 
Van Buren, Arkansas River, AR Completed 1952 438,222 - 
Village Creek, White River, and Mayberry 
Levee Districts, AR" Completed 1972 1,567,156 - 
Village Creek, Jackson and 
Lawrence Counties, AR Inactive 1977 510,217 - 
West of Morrilton, Arkansas River, AR Completed 1962 1,269,959 - 
White River, at Hwy 14, /4 mile east 
of Oil Trough, AR Completed 1981 214,308 - 
White River Bank Stab., Batesville, AR Completed 1986 101,1(X) - 
1. Reclassified as inactive in Jun '77; reviewed & de- 3. Reclassified as inactive in Jul '85. 
ferred in May '85. 4. See H Doc. 577, 87th Cong., 2d sess., for description of 
2. Construction of project cancelled because local in- project. 
terests failed to provide right-of-way for construction and 5. Reclassified in Jun '77; inability of local interests to 
maintenance. meet local cooperation requirements. 
18-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 18-G DEAUTHORIZED PROJECTS 
For Last Funds Expended 
Full Report 
See Annual Date Federal Contributed 
Project Report For Authority Deauthorized Funds Funds 
Crooked Creek Lake 
& Levee, AR 1969 1968 FCA 1986 - 
Lone Rock, Buffalo 
River, AR 1959 1938 FCA 1977 $130,653 - 
Water Valley, Eleven 
Point River, AR & MO 1959 1983 FCA 1977 $414,011 - 
18-18 
- I-- ----

TABLE 18-H ARKANSAS RIVER BASIN; AR, OK, AND KS: NAVIGATION 
(See Section 1 of Text) 
Miles Elevation Char- Year 
Up- Upper Depth on Miter acter Opened 
stream Lock Pool Sill of Kind to Total 
from Miles to Dimension Lift (feet, Upper Lower Founda- of Type of Navi- Estimated 
Feature Mouth1 Nearest Town (feet) (feet) MSL) (feet) (feet) tion Dam Construction gation Cost 
LITTLE ROCK 
DISTRICT 
Norrell L&D No. 1 
Lock No. 2 
Wilbur D. Mills Dam 
(No. 2) 
L&D No. 3 
L&D No. 4 
L&D No. 5 
David D. Terry 
L&D (No. 6) 
Murray L&D (No. 7) 
Toad Suck Ferry 
L&D (No. 8) 
Arthur V. Ormond 
L&D (No. 9) 
10.3 
13.3 
40.5 
50.2 
66.0 
86.3 
108.1 
125.4 
155.9 
8 east of Arkansas 
Post, AR 
6 east of Arkansas 
Post, AR 
3 southeast Arkansas 
Post, AR 
5 north of Grady, AR 
7 east of Pine Bluff, 
AR 
4 southeast of 
Redfield, AR 
12 southeast of Little 
Rock, AR 
6 northwest of Little 
Rock, AR 
6 west of Conway, AR 
176.9 3 southwest of 
Morrilton, AR 
110 by 600 
110 by 600 
110 by 600 
110 by 600 
110 by 600 
110 by 600 
110 by 600 
110 by 600 
30 max. 
20 nom. 
28 max. 
20 
14 
17 
18 
18 
16 
142 
162 
182 
196 
213 
231 
249 
265 
110 by 600 19 -287 
16 
18 
18 
18 
18 
18 
18 
18 
15 
14 
14 
14 
14 
14 
14 
14 
Piles in 
sand 
Piles in 
sand 
Piles in 
sand 
Piles in 
sand 
Piles in 
sand 
Clay 
Piles in 
sand 
Shale 
Shale 
Fixed 
overflow 
Movable 
Movable 
Movable 
Movable 
Movable 
Movable 
Movable 
Concrete 
Gated concrete 
spillway with 
embankment 
ends 
Gated concrete 
spillway with 
embankment 
ends 
Gated concrete 
spillway with 
embankment 
ends 
Gated concrete 
spillway with 
embankment 
ends 
Gated concrete 
spillway with 
embankment 
ends 
Gated concrete 
spillway with 
embankment 
ends 
Gated concrete 
spillway with 
embankment 
ends 
18 14 Shale Movable Gated concrete 
spillway with 
embankment 
ends 
1967 
1967 
1968 
1968 
1968 
1968 
1968 
1969 
1969 
1969 
$34,265,00( 
43,869,000 
33,791,000 
40,831,000 
29,568,000 
62,585,000 
37,492,000 
56,912,000 
34,357,000 
I

TABLE 18-H 
(Continued) 
Miles 
Upstream 
Feature 
Dardanelle 
L&D (No. 10) 
L&D No. 11 
Ozark-Jeta Taylor 
L&D (No. 12) 
James W. Trimble 
L&D (No. 13) 
from 
Iouth' 
205.5 2 n
ARKANSAS RIVER BASIN; AR. OK, AND KS: NAVIGATION 
(See Section 1 of Text) 
Elevation Char- 
Uper Depth on Miter acter 
Lock Pool Sill of Kind 
Miles to Dimension Lift (feet, Upper Lower Founda- of 
Nearest Town (feet) (feet) MSL) (feet) (feet) tion Dam Co 
orthwest of 110 by 600 54 338 18 14 Movable Sandstone G 
Dardanelle, AR 
- Deleted 
256.8 1 east of Ozark, AR 
292.8 7 east of Fort Smith, 
AR 
110 by 600 34 370 18 15 Sandstone Movable 
and shale 
110 by 600 20 392 18 14 Sandstone Movable 
and shale 
Year 
Opened 
to 
Type of Navinstruction 
gation 
ated concrete 1969 
spillway with 
embankment 
ends 
Gated concrete 1969 
spillway with 
embankment 
ends 
Gated concrete 1969 
spillway with 
embankment 
ends 
TULSA DISTRICT3 
James W. Trimble 
L&D (No. 13) (part) 
W. D. Mayo 
L&D (No. 14) 
Robert S. Kerr 
L&D (No. 15) 
Webbers Falls 
L&D (No. 16) 
Chouteau L&D 
(No. 17) 
Newt Graham 
L&D (No. 18) 
319.6 
336.2 
366.6 
401.4 
421.6 
4 east of Redland, 
OK 
1 north of Cowlington, 
OK 
1 northwest of Gore, 
OK 
4 northwest of Okay, 
OK 
8 southwest of Inola, 
OK 
110 by 600 
110 by 600 
110 by 600 
110 by 600 
110 by 600 
20 
48 
30 
21 
21 
412 
460 
490 
511 
532 
14 
18 
19 
15 
15 
15 
14 
16 
14 
14 
Rock 
Rock 
Rock 
Rock 
Rock 
Movable 
Movable 
Movable 
Movable 
Movable 
Gated concrete 
spillway with 
embankment 
ends 
Gated concrete 
spillway with 
embankment 
ends 
Gated concrete 
spillway with 
embankment 
ends 
Gated concrete 
spillway with 
embankment 
ends 
Gated concrete 
spillway with 
embankment 
ends 
Total 
Estimated 
Cost 
$84,270,124 
85,629,412 
46,187,000 
1970 
1970 
1970 
1970 
1970 
1970 
6,858,000 
32,655,000 
94,578,237 
83,738,277 
31,619,000 
44,355,000 
0y
O 
c12 
0
0 z 
0
C12 
0 
1.

TABLE 18-H 
(Continued) 
ARKANSAS RIVER BASIN; AR, OK, AND KS: NAVIGATION 
(See Section 1 of Text) 
Additional features entering into cost of project 
Little Rock District: 
Bank stabilization and channel rectification, mile 33.7 to 362 and 
Arkansas-White Cutoff. 100 per cent complete .............. $119,300,184 
Maintenance and repair fleet and marine terminals., 
99 per cent complete ....... ................................ 7,500,000 
Total. Little Rock District .................. .............. 716,556,720 
Navigation aids (US Coast Guard)........................... 2,268,000 
Tulsa District:; 
Bank stabilization and channel rectification. Short Mountain 
to Fort Smith, complete ................................... 12,700,038 
Maintenance and repair fleet and marine terminals, 
com plete .................................................. 2,750,000 
Subtotal .................................. .............. $309,253,552 
Upstream Lakes. 
Oologah, 90.2 miles upstream from mouth, Verdigris River 
complete ....... ................................ $ 46,772,329 
Keystone, 638.8 miles upstream from mouth, Arkansas River, 
com plete ......... ........................................ 123,171,173 
Eufaula, 27 miles upstream from mouth, Canadian River, 
com plete ................................................ 123,350,747 
Subtotal .............................................. 293,294,249 
Total, Tulsa District....................... ............. 602,547,801 
Total Project Cost 99.8 percent complete ............... $1,319,104,521 
1. Navigation mileage from mouth of White River except 
Dam No. 2 is 40.5 miles above mouth of Arkansas River. 
2. Includes cost of entrance channel. 
3. Details in Tulsa District report.

TABLE 18-I ARKANSAS RIVER BASIN; AR, OK, AND KS: LAKES 
(See Section 1 of Text) 
Miles Drainage Height Reservoir Power Year or Total 
Above Area of Dam Capacity Development Percent Estimated 
Lake and State River Mouth Nearest Town (sq mi) (feet) Type (acre-feet) (kilowatts) Complete Cost 
Blue Mountain, AR Petit Jean 74.4 Paris, AR 488 115 Earthfill 257,900 - 1947 $ 5,069,97 
Canton, OK North Canadian 384.3 Canton, OK 12,483 68 Earthfill 383,300 - 1948 11,209,83 
Elk City, KS Elk 8.7 Independence, KS 634 
(Table Mound) 107 Earthfill 284,300 - 1966 19,052,99 
Eufaula, OK 1 2 Canadian 27.0 Eufaula, OK 47,522 114 Earthfill 3,798,000 90,000 1964 123,350,79 
Fall River, KS Fall 54.2 Fall River, KS 585 94 Earthfill 256,400 - 1949 10,550,87 
Fort Gibson, OK' Grand (Neosho) 7.7 Fort Gibson, OK 12,492 110 Concrete-gravity 1,284,400 45,000 1953 42,591,29 
Keystone, OK1 
2 3 Arkansas 538.8 Sand Springs, OK 74,506 121 Earthfill 1,836,500 70,000 1964 123,171,17 
Markham Ferry, OK Grand (Neosho) 47.4 Pryor, OK 11,533 90 Earthfill 444,500 100,000 1968 6,908,75 
Neodesha, KS5 Verdigris 222.8 Neodesha, KS 1,152 74 Earthfill 90,000 - 0 97.91 
Nimrod, AR Fourche La Fave 62.6 Plainview, AR 680 103 Concrete-gravity 336,010 - 1942 4,092,82 
Oologah, OK2 Verdigris 90.2 Claremore, OK 4,339 137 Earthfill 1,519,000 - 1974 46,722.32 
Pensacola, OK' 6 Grand (Neosho) 77.0 Disney, OK 10,298 147 Concrete arch 2,197.000 86,400 1940 52,12 
Tenkiller Ferry, OK' a Illinois 12.8 Gore, OK 1,610 197 Earthfill 1,230,800 34,000 1953 24,017,72 
Toronto, KS Verdigris 271.5 Toronto, KS 730 90 Earthfill 199,700 - 1960 13,896.32 
Wister, OK Poteau 60.9 Wister, OK 993 99 Earthfill 427,900 - 1949 10,501.22 
Subtotal, exclusive of Eufaula, Keystone, and Oologah, 93 percent complete 148,041,86 
Arkansas River Basin; AR, OK and KS: Navigation (Table 18-11) 1.319,104,52 
Total, Arkansas River Basin, 98 percent complete 1,467,146,38 
4
4
0
1
3
8
3
6
0
6
9
6
4
4
6
1
1
2 
1. Project includes facilities for production of hydroelectric 
power. 
2. Cost included in navigation project. 
3. Details in Tulsa District report. 
4. Constructed by State of Oklahoma under the name of 
Robert S. Kerr Dam (Lake Hudson). Estimate shown is for 
Federal participation. 
5. Inactive. Estimate is based on 1954 price levels. 
6. Constructed by State of Oklahoma under the name 
Grand River Dam (Lake O' The Cherokees). Estimate shown is 
for Federal participation. 
I)
C 
'O) 
0y

LITTLE ROCK, AR, DISTRICT 
TABLE 18-J LITTLE RIVER BASIN, AR: LAKES 
(See Section 27 of Text) 
Project River Site' Nearest Town 
DeQueen Lake' Rolling Fork River 22.8 DeQueen, AR 
Gillham Lake' Cossatot River 49.0 Gillham, AR 
Dierks Lake' Saline River 56.6 Dierks, AR 
Millwood Lake' Little River 16.0 Millwood, AR 
1. Project is reported separately herein. 
18-23

TABLE 18-K WHITE RIVER BASIN; AR, AND MO: LAKES 
(See Section 33 of Text) 
Miles Drainage Reservoir Power Total 
Above Area Height of Dam Above Streambed Capacity Development Estimated 
Lake River Mouth Nearest Town (sq mi) and Type (acre-feet) (kilowatts) Cost1 
Beaver2 White 609.0 Eureka Springs, AR 1,186 228 feet concrete-gravity and earthfill 1,952,000 112,000 $ 50,797,00 
Bell Foley3 Strawberry 27.2 Poughkeepsie, AR 519 136 feet concrete-gravity and earthfill 518,000 - 93,700,00 
Bull Shoals2 White 41&6 Mountain Home, AR 6,036 258 feet concrete-gravity 5,408,000 340,000 96,356,00 
Clearwater2 Black 257.4 Piedmont, MO 898 154 feet earthfill 413,000 - 11,395,00 
Greers Ferry2 Little Red 79.0 Heber Springs, AR 1,146 243 feet concrete-gravity 1,844,000 96,000 55,125,00 
Norfork2 North Fork 4.8 Norfork, AR 1,806 216 feet concrete-gravity 1,983,000 80,550 111,624,00 
Table Rock 2 White 523.8 Branson, MO 4,020 252 feet concrete-gravity and earthfill 3,462,000 200,000 71,233,00 
Total 15,580,000 828,550 490,230,00 
0
0
0
0
0
0
0
0 
1. Current FY price levels unless otherwise noted. 
2. For details, see individual reports. 
3. Inactive-placed in a deferred status in May 1985. Estimate 
based on 1982 price levels.

LITTLE ROCK, AR, DISTRICT 
TABLE 18-L FLOOD CONTROL WORK 
UNDER SPECIAL AUTHORIZATION 
(Section 205, PL 858, 80th Cong., as amended (Preauthorization) 
(See Section 21 of Text) 
Total Costs 
Study Identification Initiation Status Completion FY 87 through 
Date Date Costs Sept. 30, 1987 
Blossom Way Creeks, Rogers, AR1 Aug 1983 Recon 1 *Sep 1985 $ 18 $112,500 
Carter Creek & Spring River, Carthage, MO' Apr 1986 Appraisal' *Sep 1986 7,500 7,500 
Cloverdale Drain, Little Rock, ARI Dec 1983 DPR' *Sep 1986 980 97,500 
Crooked & Dry Jordan Creeks, Harrison, AR2 Sep 1984 Recon Jun 1988 46 85,000 
Current River & Tributary A, Van Buren, MO Aug 1985 Recon Mar 1988 32,933 45,699 
Holly & Dierks Creeks, Dierks, AR Aug 1983 Recon' *Feb 1987 7,977 47,499 
Hurricane Creek, Ashdown, AR Sep 1983 Recon Aug 1988 142 24,140 
Kelley Creek, Monett, AR3 Sep 1983 Recon 3 *Jul 1987 32,795 106,349 
Lost & Little Lost Creeks, Seneca, MO2 Aug 1983 DPR2 *Apr 1985 69 76,335 
McKenzie Creek, Piedmont, MO Sep 1983 DPR Jun 1988 47,852 162,873 
Mine & Dodson Creeks, Nashville, AR' Jan 1983 Recon' *Jan 1986 214 87,500 
Prairie Creek, Russellville, AR Nov 1983 Recon' *May 1987 237 56,201 
Spring River, Carthage, MO Apr 1986 Appraisal' *Sep 1986 7,500 7,500 
Sulphur Creek, Heber Springs, AR Aug 1983 Recon Oct 1987 38,927 56,497 
Taylor Loop Creek, Hwy 10, Little Rock, AR Sep 1986 Appraisal' *Nov 1986 7,500 7,500 
Tucker Creek, Conway, AR3 Sep 1984 Appraisal3 *Aug 1985 42,090 50,933 
White River, Batesville, AR Aug 1983 DPR Jan 1988 37,511 172,639 
White River, St. Paul, AR4 Aug 1985 Appraisal 4 *Sep 1986 7,500 7,500 
*Accomplished. 
1. No further studies recommended. 
2. City unable to provide assurances. 
3. Further study recommended. 
4. Further study recommended under Sec. 208, 1954 FCA. 
18-25

TULSA, OKLAHOMA, DISTRICT * 
The civil works portion of this District covers an area of 
approximately 160,000 square miles which includes 
Oklahoma and parts of Kansas and Texas within the 
Arkansas and Red River Basins. The District's responsibilities 
within the Arkansas River Basin cover southern 
Kansas, northern Oklahoma, and the Texas Panhandle. 
These areas are embraced in the drainage basin of the 
Arkansas River and its tributaries above the mouth of the 
Poteau River, extending to the Kansas-Colorado State 
line, exclusive of that portion of the South Canadian 
River Basin and its tributaries west of the Texas-New 
Mexico State line. The District's responsibilities within 
the Red River Basin cover the northern portion of Texas 
and the southern portion of Oklahoma. These areas are 
embraced in the drainage basin of the Red River and its 
tributaries above Fulton, AR. The District is also responsible 
for operation and maintenance of the McClellan- 
Kerr Arkansas River Navigation System in Oklahoma. 
IMPROVEMENTS 
Navigation 
1. McClellan-Kerr Arkansas River 
Navigation System, OK ............... 
2. Other Authorized Navigation Projects ... 
Flood Control 
3. Arcadia Lake, OK ................... 
4. Arkansas City, KS ................... 
5. Arkansas-Red River Basins Chloride 
Control Projects, KS, OK, and TX ...... 
5a. Area V, Estelline Springs ............. 
5b. Area VIII........................... 
6. Birch Lake, OK..................... 
7. Candy Lake, OK ..................... 
8. Canton Lake, OK .................... 
9. CopanLake,OK .................... 
10. Council Grove Lake, KS ............... 
11. El Dorado Lake, KS .................. 
12. ElkCityLake,KS .................. 
13. Fall River Lake, KS .................. 
14. Fort Supply Lake, OK ................ 
15. FryCreek, OK ...................... 
16. Great Bend, KS..................... 
17. Great Salt Plains Lake, OK ............ 
18. Halstead, KS .................. 
19. Heyburn Lake and Polecat Creek, OK ... 
20. Hugo Lake, OK ...................... 
21. Hulah Lake, OK ..................... 
22. John Redmond Dam and Reservoir, KS .. 
23. Kaw Lake, OK ...................... 
24. Lake Kemp, TX ..................... 
25. Lake Wichita, Holliday Creek, TX ...... 
26. Marion, KS ........................ 
27. Marion Lake, KS .................... 
28. Mingo Creek, OK .................... 
Page 
19-2 
19-2 
19-2 
19-2 
19-3 
19-3 
19-3 
19-3 
19-3 
19-4 
19-4 
19-4 
19-4 
19-4 
19-4 
19-4 
19-4 
19-5 
19-5 
19-5 
19-5 
19-5 
19-5 
19-6 
19-6 
19-6 
19-6 
19-6 
19-6 
19-6 
29. Oologah Lake, OK .................. . 
30. Optima Lake, OK ................... 
31. Parker Lake, OK .................... 
32. Pat Mayse Lake, TX ................. 
33. Pearson-Skubitz Big Hill Lake, KS ...... 
34. Pine Creek Lake, TX ................ 
35. Sardis Lake,OK ..................... 
36. Skiatook Lake, OK ................... 
37. Toronto Lake, KS ................... 
38. Upper Little Arkansas River, KS ....... 
39. Waurika Lake, OK .................. 
40. Wister Lake, OK.................... 
41. Other Authorized Flood Control Projects . 
42. Inspection of Completed Local Flood 
Protection Projects ................... 
43. Flood Control Work Under Special 
Authorization ....................... 
Multiple-Purpose Projects Including Power 
44. Broken Bow Lake, OK ............... 
45. Eufaula Lake, OK .................. 
46. Fort Gibson Lake, OK ................ 
47. Grand Lake O' the Cherokees, OK ...... 
48. Keystone Lake, OK .................. 
49. Lake Texoma (Denison Dam), OK 
andTX ........................... 
50. Robert S. Kerr Lock and Dam and 
Reservoir, OK ....................... 
51. Tenkiller Ferry Lake, OK ............. 
52. W.D. Mayo Lock and Dam, OK ......... 
53. Webbers Falls Lock and Dam, OK ....... 
19-1 
19-7 
19-7 
19-7 
19-7 
19-7 
19-7 
19-7 
19-8 
19-8 
19-8 
19-8 
19-8 
19-8 
19-8 
19-9 
19-9 
19-9 
19-9 
19-9 
19-9 
19-9 
19-9 
19-10 
19-10 
19-10

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
General Investigations 
54. Surveys ............................ 19-10 
55. Collection and Study of Basic Data ....... 19-10 
56. Continuation of Planning and 
Engineering ......................... 19-10 
57. Advanced Engineering and Design ....... 19-10 
Tables 
19-A Cost and Financial Statement............ 19-11 
19-B Authorizing Legislation ................ 19-16 
19-C Other Authorized Navigation Projects ..... 19-18 
19-D Not Applicable 
19-E Other Authorized Flood Control Projects... 19-18 
19-F Not Applicable 
19-G Deauthorized Projects ................ 19-19 
19-H Arkansas River Basin Multiple- 
Purpose Plan ........................ 19-19 
19-I Inspection of Completed Local Flood 
Protection Projects .................... 19-20 
19-J Not Applicable 
19-K Flood Control Work Under Special 
Authorization ........................ 19-21 
19-L General Investigations .... ............ .19-22 
Navigation 
1. McCLELLAN-KERR ARKANSAS 
RIVER NAVIGATION SYSTEM 
(Tulsa District Portion), OK. 
Location. The Tulsa District portion of the McClellan- 
Kerr Arkansas River Navigation System provides a navigation 
route up the Arkansas River from the Oklahoma- 
Arkansas State line to the head of navigation at Catoosa, 
OK, near Tulsa, OK. The total length of the Tulsa District 
portion of the system is 137 navigation miles. Descriptions 
and costs for the entire navigation system can be 
found in Little Rock District's entry in this Annual 
Report. 
Existing projects. The McClellan-Kerr Arkansas 
River navigation project is a component of the multiplepurpose 
plan for the Arkansas River Basin which provided 
for the improvement of the basin through the construction 
of coordinated developments for navigation, 
hydroelectric power, flood control, water supply, water 
quality control, sediment control, recreation, and fish and 
wildlife propagation. The McClellan-Kerr project consists 
of bank stabilization, channel straightening, and cutoffs 
as required. The navigation channel has a minimum 
depth of 9 feet and a minimum width of 250 feet on the 
Arkansas River, and a minimum width of 150 feet on the 
Verdigris River. The Tulsa District portion of the navigation 
system consists of the: Arkansas River Bank Stabilization 
and Channel Rectification, Chouteau Lock and 
Dam, Newt Graham Lock and Dam, Robert S. Kerr Lock 
and Dam, Robert S. Kerr Marine Terminal, Sans Bois 
Navigation Channel, W.D. Mayo Lock and Dam, Webbers 
FallsLock and Dam, and the pool in Oklahoma which was 
created by Lock and Dam 13 in Arkansas. The other parts 
of the multiple-purpose plan for the Arkansas River 
Basin are listed in table 19-H. 
Terminal facilities. Public port facilities are in 
operation at Muskogee and Catoosa, OK. At Sallisaw, OK 
a port authority has been active in seeking development 
of public facilities at that location. Other private commercial 
port facilities are complete and in operation at 
eight Oklahoma locations. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Operation and 
maintenance continued. 
2. OTHER AUTHORIZED 
NAVIGATION PROJECTS. 
See table 19-C. 
Flood Control. 
3. ARCADIA LAKE, OK. 
Location. On the Deep Fork River at river mile 213.8, 
in the metropolitan area of Oklahoma City and Edmond, 
OK, about 1.5 miles west of Arcadia, in Oklahoma 
County, OK. (See Arcadia, OK, Geological Survey map, 
scale 1:24,000.) 
Existing project. The plan of improvement provides 
for flood control, water supply, and recreation by construction 
of an earthfill dam approximately 104 feet high 
and 5,200 feet long with a high-level uncontrolled spillway. 
Outlet works will consist of a gated tower and 
conduit. The lake will have a total capacity of 92,000 acrefeet 
(27,380 for conservation, 64,430 for flood control, and 
190 for sedimentation reserve) and will control a drainage 
area of 105 square miles. Construction began in October 
1980. 
Local cooperation. Section 2, Flood Control Act of 
1938; the Water Supply Act of 1958; the Federal Water 
Project Recreation Act of 1965; and Section 221 of the 
Flood Control Act of 1970 apply. 
Operations and results during fiscalyear. The 
project is 94 percent complete as of September 30, 1987. 
Estimated cost is $89,700,000 (October 1987 price level). 
Work to complete the relocation of the Turner Turnpike 
and to complete the embankment, spillway, and recreation 
facilities, and the clearing of some project land was 
performed during the fiscal year. 
4. ARKANSAS CITY, KS. 
Location. On the confluence of the Arkansas and 
Walnut Rivers in southern Kansas, approximately 4 
miles north of the Kansas-Oklahoma State line at the 
crossroads of U.S. Highways 77 and 166 in Cowley County, 
OK. (See Arkansas City, KS Geological Survey Map, scale 
1:24,000.) 
Existing project. The project was authorized by the 
Water Resources Development Act of 1986 and is available 
for initiation of preconstruction engineering and 
design. The plan of improvement provides for raising and 
19-2

TULSA, OKLAHOMA, DISTRICT 
extending the existing horseshoe-shaped levee to provide 
standard project flood protection for the city. The lower 
Walnut River channel would be modified to a 350-footbottom 
width with 3-1 side slopes for 1.9 miles. 
Local cooperation. Non-Federal sponsors are 
required to contribute a minimum of 25 percent of the 
total project cost, with a minimum cash payment of 5 
percent; all lands, easements, rights-of-way, relocations, 
and dredged materials; and to operate and maintain the 
project after construction. 
Operations and results during fiscal year. Work to 
plan, design, and construct a standard flood protection 
project, by raising and extending the existing levee. 
Estimated project cost of the plan is $15,000,000 (October 
1987 price level). 
5. ARKANSAS-RED RIVER BASINS 
CHLORIDE CONTROL PROJECTS, 
KS, OK, AND TX. 
Location. On certain tributary streams of the 
Arkansas and Red Rivers in the western half of the Tulsa 
District. 
Existing project. Provided for studies involving control 
of water pollution caused by 15 natural salt sources 
identified in 1957 by the U.S. Public Health Service. The 
Arkansas and Red Rivers represent major national and 
regional water resources severely limited due to poor 
water quality primarily caused by the natural pollutant, 
sodium chloride. The Arkansas River is polluted by five 
naturally occurring salt sources located in northwestern 
Oklahoma and southwestern Kansas. The Red River 
Basin is polluted by ten naturally occurring salt sources 
located in northwestern Texas and southwestern Oklahoma. 
These studies included the construction and subsequent 
maintenance of an injection well and a ring dike 
used for data collection. Preauthorization studies 
completed in 1966 and 1970 recommended construction of 
project features at 13 of the 15 sites. For a detailed 
discussion of the chloride control projects, see page 19-4 of 
the Annual Report for 1983. 
Local cooperation. Descriptive text concerning local 
cooperation requirements is given on page 19-5 of the 
Annual Report for 1983. 
5a. AREA V, ESTELLINE SPRINGS. 
Location. Chloride Control Area V is located about 0.5 
mile east of Estelline, TX, on the Prairie Dog Town Fork 
of the Red River. 
Existing project. The plan of improvement consisted 
of an earthen dike, 9 feet high and 340 feet in diameter, 
around Estelline Springs. The springs were a salt water 
source which decreased the usability of the surface water 
in the area. Construction was started in 1963 and the 
structure was completed in 1964. 
5b. AREA VIII. 
Location. Chloride Control Area VIII is located at 
river mile 74.9 of the South Fork of the Wichita River in 
King County, TX, about 5 miles east of Guthrie, TX. 
Existing project. The plan of improvement consists of 
two low-flow collection dams with attendant pumping 
stations and pipeline facilities. These two structures (the 
Bateman Low Flow Dam and the Ross Ranch Low Flow 
Dam) will be equipped with an inflatable fabric-type weir 
located in the spillway section which would be deflated to 
pass relatively good quality high flows. The collected 
brines will be pumped to the storage reservoir behind the 
Truscott Brine Dam. This brine dam, located at river mile 
3.6 on Bluff Creek (a tributary of the North Fork of the 
Wichita River) about 3 miles northwest of Truscott, TX, 
would contain the collected brines from this area as well 
as future collections from Area X. Preconstruction planning 
for Area X is essentially complete and construction 
is awaiting approval from the Secretary of the Army and 
funding from Congress. 
Local cooperation. See page 19-5 of the Annual 
Report for 1983. 
Operations and results during fiscal year. 
Construction was initiated at Area VIII and Truscott 
Brine Dam in 1976. The project was completed in FY87. 
Estimated cost of the Area VIII project and Stage I development 
of Truscott Brine Dam is $50,833,000 (October 
1987 price level). 
6. BIRCH LAKE, OK. 
Location. On Birch Creek at river mile 0.8, about 1.5 
miles south of Barnsdall in Osage County, OK. (See 
Barnsdall, OK, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see the Annual Report for 1979. Construction 
began in November 1973 and the project was 
placed in useful operation in March 1977. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
7. CANDY LAKE, OK. 
Location. On Candy Creek, a tributary of Bird Creek 
in the Verdigris River Basin, at river mile 1.9. The 
damsite is about 1.5 miles northeast of Avant in Osage 
County, OK. (See Avant, OK, Geological Survey map, 
scale 1:24,000.) 
Existing project. The plan of improvement provides 
for an earthfill dam about 4,200 feet long, including an 
uncontrolled concrete spillway, with a maximum height 
of 103 feet above streambed. Outlet works will consist of a 
gated intake structure, a 10- by 11.25-foot conduit, and a 
stilling basin. An 18- by 24-inch low-flow pipe and an 18- 
inch water supply pipe will be provided. The lake will 
have a total capacity of 75,420 acre-feet (44,160 for conservation 
and sediment reserve and 31,260 for flood control). 
The drainage area above the damsite is 43 square 
miles. Candy Lake will be operated as a unit of a sevenlake 
system for flood control in the Verdigris River Basin 
in Oklahoma. Construction began in September 1976. 
Local cooperation. Section 2 of the Flood Control Act 
of 1938, the Water Supply Act of 1958, and Section 221 of 
the Flood Control Act of 1970 apply. 
Operations and results during fiscal year. The project 
was 13 percent complete when construction was 
19-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
delayed because the U.S. Justice Department decided to 
withdraw condemnation proceedings to acquire mineral 
rights. Estimated cost of the project was $38,300,000 
(October 1984 price level). The project was deferred in 
January 1984. 
8. CANTON LAKE, OK. 
Location. On the North Canadian River at river mile 
394;, about 2 miles north of Canton in Blaine County, OK. 
(See Canton, OK, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 590 of the Annual Report for 1969. 
Construction began in December 1940 and the project 
was placed in useful operation in April 1948. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
9. COPAN LAKE, OK. 
Location. On the Little Caney River, a tributary of the 
Caney River in the Verdigris River Basin, at river mile 
7.4, about 2 miles west of Copan in Washington County, 
OK. (See Copan, KS, Geological Survey map, scale 
1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-7 of the Annual Report for 
1983. Copan Lake is operated as a unit of a seven-lake 
system for flood control in the Verdigris River Basin in 
Oklahoma. Construction began in November 1972 and 
the project was placed in useful operation in April 1983. 
SLocal cooperation. Fully complied with. 
Operations and results during fiscal year. Copan 
Lake became operational in 1983. There are some real 
estate deficiencies remaining to be settled, some final 
contract payments, and construction of remaining recreation 
facilities, for which funds were provided in FY 86. 
10. COUNCIL GROVE LAKE, KS. 
Location. On the Grand (Neosho) River at river mile 
450, about 1.5 miles northwest of Council Grove in Morris 
County, KS. (See Council Grove Lake, KS, Geological 
Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 519 of the Annual Report for 1969. 
Construction began in June 1959 and the project was 
placed in useful operation in July 1964. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
11. EL DORADO LAKE, KS. 
Location. On the Walnut River, a tributary of the 
Arkansas River, at river mile 100.2, about 4 miles 
northeast of El Dorado in Butler County, KS. (See El 
Dorado, KS, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-7 of the Annual Report for 
1983. El Dorado Lake was authorized as a unit of a threelake 
system for flood control in the Walnut River Basin. 
Construction began in October 1973 and impoundment 
began in June 1981. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. The 
project is 99 percent complete. Work to complete the real 
estate activities and recreational facilities was performed 
during the fiscal year. 
12. ELK CITY LAKE, KS. 
Location. On the Elk River at river mile 8.7, about 7 
miles northwest of Independence in Montgomery County, 
KS. (See Table Mound, KS, Geological Survey map, scale 
1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 593 of the Annual Report for 1969. 
Construction began in February 1962 and the project was 
placed in useful operation in March 1966. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
13. FALL RIVER LAKE, KS. 
Location. On the Fall River at river mile 54.2, about 4 
miles northwest of Fall River in Greenwood County, KS. 
(See Severy, KS, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 953 of the Annual Report for 1969. 
Construction of the dam began in May 1946 and the project 
was placed in full operation in April 1949. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
14. FORT SUPPLY LAKE, OK. 
Location. On Wolf Creek, a tributary of the North 
Canadian River, at river mile 5.5, about 12 miles 
northwest of Woodward in Woodward County, OK. (See 
Fort Supply, OK, Geological Survey Map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 594 of the Annual Report for 1969. 
Construction began in October 1938 and the project was 
placed in full flood control operation in May 1942. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
15. FRY CREEK, OK. 
Location. On the north side of the city of Bixby in 
Tulsa County, OK. (See Bixby, OK, Geological Survey 
Map, scale 1:24,000.) 
Existing project. The project was authorized for construction 
by the Water Resorces Development Act of 1986. 
The plan of improvement includes enlarging both Fry 
Creeks in their upper reaches, merging the two creeks, 
and then diverting the combined creeks to the Arkansas 
River. A levee will be built to protect the area against 
flooding from Haikey Creek. About 4.3 miles of modified 
channels and diversions will be built and 20 acres of land 
for mitigation of fish and wildlife losses will be acquired. 
19-4

TULSA, OKLAHOMA, DISTRICT 
Local cooperation. Local interests are required to 
contribute lands, easements, rights-of-way, relocations, 
and dredged material, plus a cash contribution of five 
percent of the total cost, and to operate, maintain, and 
rehabilitate the project after construction. 
Operations and results during fiscal year. Work to 
complete preconstruction engineering and design plans 
continued. Total estimated project cost is $14,800,000 
(October 1987 price level). 
16. GREAT BEND, KS. 
Location. In Barton County, KS, on the north bank of 
the Arkansas River about 4.5 miles above its confluence 
with Walnut Creek. (See Great Bend, KS, Geological 
Survey map, scale 1:24,000.) 
Existing project. The plan, authorized by the Flood 
Control Act of 1965, provides for 6.2 miles of leveed 
channel to divert Walnut Creek flood flow around Great 
Bend into the Arkansas River upstream from the city; a 
1.5-mile leveed channel to divert Little Walnut Creek 
flood flow into the Walnut Creek diversion levees along 
the Arkansas; a tie-back levee 4.3 miles long on the 
Arkansas left bank upstream from the junction of the 
Walnut diversion channel; and appurtenant facilities. 
Local cooperation. In accordance with the cost sharing 
and financing concepts reflected in the Water 
Resources Development Act of 1986, the city of Great 
Bend, KS, agreed to participate in project construction. 
Operations and results during fiscal year. Work 
accomplished includes the completion of a design memorandum 
and plans and specifications, awarding of a construction 
contract for initial levee work, completion of a 
local cost sharing agreement, and continuation of engineering 
and design on other project features. Estimated 
cost of the project is $44,500,000 (October 1987 price 
level). 
17. GREAT SALT PLAINS LAKE, OK. 
Location. On the Salt Fork of the Arkansas River at 
river mile 103.3, about 12 miles east of Cherokee in 
Alfalfa County, OK. (See Jet, OK, Geological Survey map, 
scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 594 of the Annual Report for 1969. 
Construction of the project began in September 1938 and 
was completed in July 1941. The project was placed in full 
flood control operation in May 1941. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
18. HALSTEAD, KS. 
Location. In the city of Halstead in Harvey County, 
KS, along the Arkansas River. (See Halstead, KS, Geological 
Survey Map, scale 1:24,000.) 
Existing project. Provides for channel modification 
and construction of about 4 miles of levee in combination 
with clearing, snagging, straightening and widening 
approximately 3.6 miles of the Little Arkansas River 
channel to a 60-foot-bottom width in the vicinity of 
Halstead. Channel modification will be restricted to one 
side of the channel except in transition areas. Tree planting 
and revegetation will be done and ten pool riffle areas 
will be established to minimize environmental impacts. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. The project 
was authorized by the Water Resources Development 
Act of 1986. The authorizing document requires a report 
on the need for acquisition of additional land and access 
points to mitigate the adverse affects of the project on fish 
and wildlife habitat. The report was scheduled for completion 
in 1987. Other work in fiscal year 1987 included the 
design of drainage structures, gate closures, a levee, and 
channel modifications. Physical construction was delayed 
to allow the local sponsor to obtain the necessary financing 
for their share of the project. The plans and specifications 
and the contract award are scheduled to be completed 
in fiscal year 1988 pending execution of a cost 
sharing agreement. Estimated project cost is $7,500,000 
(October 1987 price level). 
19. HEYBURN LAKE AND 
POLECAT CREEK, OK. 
Location. On Polecat Creek, a minor tributary of the 
Arkansas River, at river mile 48.6, about 11 miles west of 
Sapulpa in Creek County, OK. (See Lake Heyburn, OK, 
Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 599 of the Annual Report for 1969. 
Construction started in March 1948 and the project was 
placed in useful operation in October 1950. Channel 
improvements below the lake were completed in September 
1952. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
20. HUGO LAKE, OK. 
Location. On the Kiamichi River at river mile 17.6, 
about 7 miles east of Hugo in Choctaw County, OK. (See 
Hugo Dam, OK, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-12 of the Annual Report for 
1977. Construction began in October 1967 and the project 
was placed in useful operation in January 1974. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
21. HULAH LAKE, OK. 
Location. On the Caney River at river mile 96.2, about 
15 miles northwest of Bartlesville, near Hulah, in Osage 
County, OK. (See Bowring, OK, Geological Survey map, 
scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 595 of the Annual Report for 1969. 
Construction began in May 1946 and was completed in 
June 1950. The project was placed in full flood control 
operation in September 1951. 
19-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
22. JOHN REDMOND DAM AND 
RESERVOIR, KS. 
Location. The dam is located on the Grand (Neosho) 
River at river mile 343.7, about 2 miles northwest of 
Burlington in Coffey County, KS. (See John Redmond 
Dam, KS, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 581 of the Annual Report for 1970. 
Construction was initiated in July 1959 and was completed 
in December 1965. The project was placed in flood 
control operation in July 1964. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
23. KAW LAKE, OK. 
Location. On the Arkansas River at river mile 653.7, 
about 8 miles east of Ponca City in Kay County, OK. (See 
Charley Creek West, OK, Geological Survey map, scale 
1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-13 of the Annual Report for 
1977. Construction began in June 1966 and the project 
was placed in operation in May 1976. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
24. LAKE KEMP, TX. 
Location. On the Wichita River at river mile 126.7, 
about 40 miles southwest of Wichita Falls, TX. (See 
Northeast Lake Kemp, TX, Geological Survey map, scale 
1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-14 of the Annual Report for 
1977. Construction began in May 1970 and the project was 
placed in useful operation in October 1972. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
25. LAKE WICHITA, HOLLIDAY 
CREEK, TX. 
Location. The project is located in Wichita and Archer 
Counties, TX. The Lake Wichita dam and the Holliday 
Creek channel are located in the city of Wichita Falls, TX. 
(See Wichita Falls, TX, Geological Survey map, scale 
1:24,000.) 
Existing project. The proposed plan includes the 
replacement of the existing Lake Wichita dam with an 
earthen dam approximately 16,000 feet long, a concrete 
spillway, an auxiliary spillway, and low-flow outlet works. 
The plan also includes channel improvements along Holliday 
Creek from the new spillway to the Wichita River, a 
distance of 9.3 miles. 
Local cooperation. The city has removed one bridge, 
initiated construction of a portion of the channelization, 
initiated acquisition of real estate necessary for construction 
of the project, and initiated engineering and design 
for the relocation of utilities, streets, and highway bridges. 
Operations and results during fiscal year. The 
project was authorized by the Water Resources Development 
Act of 1986 and was funded in fiscal year 1987 for 
initiation of construction. A Local Cooperation Agreement 
with the city of Wichita Falls has been signed. Estimated 
project cost is $41,200,000 (October 1987 price 
levels). 
26. MARION, KS. 
Location. On Mud Creek at Marion, the county seat of 
Marion County, KS. 
Existing project. For a description of the completed 
improvement, see page 19-6 of the Annual Report for 
1984. Construction began in June 1975 and was completed 
in May 1980. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. None. 
The city of Marion, KS, is responsible for project operation 
and maintenance. 
27. MARION LAKE, KS. 
Location. On the Cottonwood River at river mile 
126.7, about 3 miles northwest of Marion in Marion 
County, KS. (See Pilson, KS, Geological Survey map, 
scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 597 of the Annual Report for 1969. 
Construction began in June 1964 and the project was 
placed in flood control operation in February 1968. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
28. MINGO CREEK, OK. 
Location. On the right-bank tributary of Bird Creek 
in Tulsa County, OK. (See Tulsa, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. The recommended plan will consist 
of 23 detention sites which would capture peak flows and 
hold them temporarily until downstream flows subside. 
There would be about 9.4 miles of channelization in 
selected locations on the tributaries and main stem of 
Mingo Creek. This plan will provide a minimum of 65- 
year protection in the major damage area. 
Local cooperation. In accordance with the cost sharing 
and financing concepts reflected in the Water 
Resources Development Act of 1986, the non-Federal 
sponsor must provide lands, easements, rights-of-way, 
and dredged material disposal areas; modify or relocate 
buildings, utilities, roads, bridges (except railroad 
bridges), and other facilities where necessary in the construction 
of the project; pay five percent of the costs allocated 
to flood control; and bear all costs of operation, 
maintenance, and replacement of flood control facilities. 
The non-Federal sponsor has also agreed to make all re- 
19-6

TULSA, OKLAHOMA, DISTRICT 
quired payments concurrently with project construction. 
The local sponsor is the city of Tulsa, OK. On 26 August 
1983, the city adopted a Resolution of Assurance to provide 
a minimum share equal to 35 percent or the traditional 
lands, easements, and rights-of-way, whichever is 
greater, and will be required to assist in the actual 
financing of construction. The city has constructed 3.5 
miles of channeland placed two excavated detention facilities 
into flood control operation. 
Operations and results during fiscal year. Funds to 
initiate preconstruction engineering and design were appropriated 
in fiscal year 1985. Funds to initiate construction 
were appropriated in fiscal year 1987. Estimated 
project cost is $158,000,000 (October 1987 price level). 
29. OOLOGAH LAKE, OK. 
Location. On the Verdigris River at river mile 90.2, 
about 2 miles southeast of Oologah in Rogers County, OK. 
(See Oologah, OK, Geological Survey map, scale 
1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-15 of the Annual Report for 
1972. Construction began in July 1950 and was placed in 
standby status in October 1951. Construction was resumed 
in December 1955 and was completed in May 1963 
for initial development. Construction for ultimate (second 
stage) development was initiated in July 1967 and 
was completed in 1974. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
30. OPTIMA LAKE, OK. 
Location. On the North Canadian River at river mile 
623.2, about 4.5 miles northeast of Hardesty in Texas 
County, OK. (See Optima Dam, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. For a description of the existing 
improvement, see page 19-16 of the Annual Report for 
1979. Construction began in March 1966, impoundment 
began in October 1978, and construction was completed 
in 1981. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
31. PARKER LAKE, OK. 
Location. On Muddy Boggy Creek, a tributary of the 
Red River, about 23 miles east of Ada in Coal County, OK. 
(See Parker, OK, Geological Survey map, scale 1:24,000.) 
Existing project. Parker Lake is a multipurpose 
element in a plan of improvement for the Upper Muddy 
Boggy Creek Basin, OK. The project consists of an earthfill 
dam about 2,100 feet long, a gated outlet works for flood 
control and water supply, and a 600-foot-wide spillway. 
The lake created would have a total storage capacity of 
237,000 acre-feet and would yield 42 million gallons per 
day for municipal and industrial water supply. The project 
was authorized by the Water Resources Development 
Act of 1986. 
Local cooperation. The Oklahoma Water Resources 
Board, the local sponsor, has agreed to provide 5 percent 
of the costs allocated to flood control upfront and to reimburse 
the costs allocated to water supply over a 30-year 
period. 
Operation and results during fiscal year. Work to 
complete preconstruction engineering and design plans 
continued. Total estimated project cost is $47,200,000 
(October 1987 price level). 
32. PAT MAYSE LAKE, TX. 
Location. On Sanders Creek, a tributary of the Red 
River, at river mile 4.6, about 12 miles north of Paris in 
Lamar County, TX. (See Grant, TX, Geological Survey 
map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 584 of the Annual Report for 1970. 
Construction began in March 1965 and the project was 
placed in full flood control operation in September 1967. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
33. PEARSON-SKUBITZ BIG 
HILL LAKE, KS. 
Location. On Big Hill Creek at river mile 33.3, about 
4.5 miles east of Cherryvale, KS. (See Dennis, KS, Geological 
Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-11 of the Annual Report for 
1983. Construction began in April 1974 and impoundment 
began in March 1981. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
34. PINE CREEK LAKE, OK. 
Location. On the Little River at river mile 145.3, 
about 5 miles northwest of Wright City in McCurtain 
County, OK. (See Wright City, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 584 of the Annual Report for 1970. 
Construction began in February 1963 and the project was 
placed in useful operation in June 1969. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. Work to complete 
sanitary facilities at the park was conducted during the 
fiscal year. 
35. SARDIS LAKE, OK. 
Location. On Jackfork Creek, a tributary of the 
Kiamichi River, at river mile 2.8, about 2.5 miles north of 
Clayton in Pushmataha County, OK. (See Yanush, OK, 
Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-11 of the Annual Report for 
1983. Sardis Lake will be operated as a unit of a three- 
19-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
lake system for flood control in the Kiamichi River Basin. 
(The three-lake system includes Hugo and Tuskahoma 
Lakes.) Construction began in August 1975 and the project 
became operational in January 1983. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Estimated 
cost of the project is $67,144,000 (October 1987 price 
level). The project is 80 percent complete. Funds were 
provided in FY 86 to complete the remaining recreation 
facilities at full Federal expense. Work was initiated to 
improve an existing road from Daisy, OK, to the lake area. 
36. SKIATOOK LAKE, OK. 
Location. On Hominy Creek, a tributary of Bird Creek 
in the Verdigris River Basin, at river mile 14.3, about 5 
miles west of Skiatook in Osage County, OK. (See Avant 
S.E., OK, Geological Survey map, scale 1:24,000.) 
Existing project. The dam is an earthfill structure 
3,590 feet long, 143 feet high, with a crown width of 32 
feet. An uncontrolled 100-foot spillway is located in the 
right abutment. Outlet works consist of a controlled 
intake structure, a 10.5-foot-diameter tunnel stilling 
basin, a 2.5- by 5-foot low-flow sluice, and a 36-inch water 
supply pipe. The lake provides a total storage of 513,500 
acre-feet (319,400 for conservation storage, 182,300 for 
flood control, and 11,800 for sedimentation), and controls 
a 354-square-mile drainage area. Skiatook Lake is operated 
as a unit of a seven-lake system for flood control in 
the Verdigris River Basin in Oklahoma. Construction 
began in January 1974, impoundment began in October 
1984, and the project became operational in November 
1984. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. The 
project is 92 percent complete. Estimated cost of the project 
is $120,325,000 (October 1987 price level), including 
deferred recreational development at $9,000,000. Work to 
plug oil and gas wells, complete real estate activities, and 
construct embankment, access roads, and recreation 
facilities was performed during the fiscal year. 
37. TORONTO LAKE, KS. 
Location. On the Verdigris River at river mile 271.5, 
about 4 miles southeast of Toronto in Woodson County, 
KS. (See Fredonia, KS, Geological Survey map, scale 
1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 600 of the Annual Report for 1969. 
Construction began in November 1954 and the project 
was placed in full operation in March 1960. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
38. UPPER LITTLE ARKANSAS 
RIVER, KS. 
Location. The Upper Little Arkansas River watershed 
lies principally within McPherson, Rice, and Reno 
Counties northwest of Wichita in central Kansas. 
Water Resources Development Act of 1986. The recommended 
plan of protection consists of a system of 18 
small dams designed for 100-year sediment and 25-year 
flood control storage. The flood plain covers 65,000 acres 
along the main stem of the Little Arkansas River and 
tributaries. 
Local cooperation. Non-Federal sponsors are 
required to contribute a minimum of 25 percent of total 
project costs with a minimum cash payment of 5 percent; 
all lands, easements, rights-of-way, relocations, and 
dredged material; and to operate and maintain the project 
after construction. 
Operation and results during fiscal year. Work to 
complete plans for preconstruction engineering and 
design continued. Total estimated project cost is 
$12,800,000 (October 1987 price level). 
39. WAURIKA LAKE, OK. 
Location. On Beaver Creek, a tributary of the Red 
River, at river mile 27.0, about 6 miles northwest of 
Waurika in Jefferson County, OK. (See Hastings, OK-TX, 
Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-12 of the Annual Report for 
1983. Waurika Lake is operated as a unit of a coordinated 
lake system for flood control in the Red River Basin. Construction 
began in July 1971 and impoundment began in 
August 1977. 
Operations and results during fiscal year. Routine 
operations and maintenance continued. 
40. WISTER LAKE, OK. 
Location. On the Poteau River at river mile 60.9, 
about 2 miles south of Wister in LeFlore County, OK. (See 
Wister, OK, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 601 of the Annual Report for 1969. 
Construction began in April 1946 and was completed in 
May 1949. The project was placed in full flood control 
operation in October 1949. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
41. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS. 
See table 19-E. 
42. INSPECTION OF COMPLETED 
LOCAL FLOOD PROTECTION 
PROJECTS. 
Inspections of completed local flood protection projects 
operated and maintained by local interests are made to 
determine the extent of compliance with approved regulations 
for operations and maintenance. The inspections 
assist the Corps of Engineers to determine if the project 
provides the flood protection for which it was constructed. 
See Table 19-I for a list of projects inspected in FY 1987. 
Fiscal year cost was $104,888. 
Existing project. The project was authorized by the
19-8

TULSA, OKLAHOMA, DISTRICT 
43. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION. 
See Table 19-K for fiscal year 1987 expenditures for 
Small Flood Control Projects Not Specifically Authorized 
by Congress (Section 205); Emergency Streambank and 
Shoreline Projects; Snagging and Clearing; and Flood 
Control and Coastal Emergencies - Rehabilitation 
Projects. 
Multiple-Purpose Projects 
Including Power 
44. BROKEN BOW LAKE, OK. 
Location. On the Mountain Fork River at river mile 
20.3, about 9 miles northeast of Broken Bow in McCurtain 
County, OK. (See Broken Bow, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvements, see page 19-17 of the Annual Report for 
1971. Construction began in November 1961 and the 
project was placed in useful operation in October 1969. 
Power units 1 and 2 were placed in operation in January 
and June 1970, respectively. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
45. EUFAULA LAKE, OK. 
Location. On the Canadian River at river mile 27.0, 
about 12 miles east of Eufaula in McIntosh County, OK. 
(See Porum, OK, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 588 of the Annual Report for 1970. 
Construction began in December 1956 and the project 
was placed in full flood control operation in February 
1964. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. Work to plan, 
design, and construct a replacement bridge over Piney 
Creek was performed during the fiscal year. Negotiations 
are currently underway with the Local Cooperation 
Agreement and the state of Oklahoma to allow the 
initiation of construction of a bridge over Muddy Creek. 
46. FORT GIBSON LAKE, OK. 
Location. On the Grand (Neosho) River at river mile 
7.7, about 5 miles north of Fort Gibson in Muskogee 
County, OK. (See Fort Gibson Dam, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 604 of the Annual Report for 1969. 
Construction began in March 1942 but was held in abeyance 
during World War II. Construction resumed in May 
1946 and was completed in June 1950. The fourth generator 
was installed and the project placed in full operation 
in September 1953. The Water Resources Development 
Act of 1986 authorized the construction of hydropower 
units 5 & 6. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
47. GRAND LAKE O' THE 
CHEROKEES, OK. 
Location. On the Grand (Neosho) River at river mile 
77.0, near the town of Disney in Mayes County, OK. (See 
Spavinaw, OK, Geological Survey map, scale 1:24,000.) 
Existing project. Grand Lake O' the Cherokees is a 
Grand River Dam Authority project. For a description of 
the completed improvement, see page 606 of the Annual 
Report for 1969. 
Operations and results during fiscal year. Flood 
control operations at this project are controlled by the 
Corps. See Section 35 andTable 19-J for additional details. 
48. KEYSTONE LAKE, OK. 
Location. On the Arkansas River at river mile 538.8, 
near Sand Springs, OK, and about 15 miles west of Tulsa, 
OK. (See Keystone Dam, OK, Geological Survey map, 
scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 589 of the Annual Report for 1970. 
Construction began in January 1957 and the project was 
placed in flood control operation in September 1964. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
49. LAKE TEXOMA (DENISON DAM), 
OK and TX. 
Location. On the Red River at river mile 725.9, about 
5 miles northwest of Denison, TX. (See Denison Dam, 
OK, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 603 of the Annual Report for 1969. 
Lake Texoma is operated as a unit of a coordinated lake 
system for flood control in the Red River Basin. Construction 
started in August 1939 and was completed in February 
1944. Commercial power generation was started in 
March 1945. Authorized work is complete except for 
installation of the third, fourth, and fifth power units. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
50. ROBERT S. KERR LOCK AND DAM 
AND RESERVOIR, OK. 
Location. On the Arkansas River at navigation mile 
336.2, about 8 miles south of Sallisaw in LeFlore County, 
OK. (See Robert S. Kerr, OK, Geological Survey map, 
scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-21 of the Annual Report for 
1972. Robert S. Kerr Lock and Dam and Reservoir is a unit 
of the McClellan-Kerr Arkansas River Navigation System. 
Construction began in April 1964 and closure was 
completed in October 1970. The lock and dam became 
operational for navigation in December 1970. Generating 
units number 1, 2, 3, and 4 were placed in operation in 
19-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
October, July, September, and November 1971, respectively. 
Local cooperation. See section 1 of this report. 
Terminal facilities. Seven sites have been developed 
for handling coal, grain, construction aggregates, and 
miscellaneous cargo. The facilities are considered adequate 
for present traffic. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
51. TENKILLER FERRY LAKE, OK. 
Location. On the Illinois River at river mile 12.8, 7 
miles northeast of Gore in Sequoyah County, OK. (See 
Gore, OK, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 606 of the Annual Report for 1969. 
Construction began in June 1947 and was completed in 
July 1953. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
52. W.D. MAYO LOCK AND DAM, OK. 
Location. On the Arkansas River at navigation mile 
319.4, about 9 miles west of Fort Smith, AR, in LeFlore 
and Sequoyah Counties, OK. (See Fort Coffee, OK, 
Geological Survey map, scale 1:24,000.) 
Existing project. The proposed plan includes construction 
of a powerhouse which would contain six 7.34- 
megawatt bulb generating units for a total installed 
capacity of 44 megawatts. The installation would produce 
an average 171,417,300 kilowatt-hours of energy annually. 
The powerhouse would be located adjacent to the left 
side of the existing spillway in the overflow embankment. 
Approach and exit channels would be dredged to top of 
rock. Power would be transmitted by connection to an 
existing Southwestern Power Administration (SWPA) 
powerline about 3 miles northeast of the project. 
Local cooperation. The Water Resources Development 
Act of 1986 authorized the Cherokee Nation of Oklahoma 
to design and construct hydroelectric generating 
facilities at W.D. Mayo Lock and Dam on the Arkansas 
River in Oklahoma. The Act provides for design and initiation 
of construction within 3 years after a binding agreement 
is executed between the Secretary of the Army and 
the Secretary of Energy, acting through the SWPA and 
the Cherokee Nation. 
Operations and results during fiscal year. Work to 
complete plans for preconstruction engineering and design 
continued. The Federal Government will operate and 
maintain the project and the power will be marketed by 
SWPA. The total estimated project cost is $90,000,000 
(October 1987 price level). 
53. WEBBERS FALLS LOCK AND 
DAM, OK. 
Location. On the Arkansas River at navigation mile 
366.6, about 5 miles northwest ofWebbers Falls in Muskogee 
County, OK.(See Webbers Falls, OK, Geological 
Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-23 of the Annual Report for 
1977. Webbers Falls Lock and Dam is a unit of the 
McClellan-Kerr Arkansas River Navigation System. Construction 
began in January 1965, and the project was 
placed in useful operation in November 1970. The lock and 
dam became operational for navigation in December 1970. 
Generating units 1, 2, and 3 were placed in operation in 
August, September, and November 1973, respectively. 
Local cooperation. See section 1 of this report. 
Terminal facilities. Cargo pier, mooring dolphins, 
warehouse, terminal building, and fuel facility were built 
by the Muskogee City-County Port Authority. Liquid cargo 
loading facility and steel unloading facility were built 
by Frontier Steel Company to serve existing traffic. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
General Investigations 
54. SURVEYS. 
Fiscal year cost was $3,842,692 which included one 
navigation study, seven flood damage prevention studies, 
three comprehensive studies, two restudies of deferred 
projects, two reviews of completed projects, one review for 
deauthorization studies, inventory of dams - special 
investigations, and coordination with both Federal and 
non-Federal agencies. Table 19-L provides a specific list 
and respective fiscal year expenditures. 
55. COLLECTION AND STUDY OF 
BASIC DATA. 
Fiscal year cost was $238,798 which includes flood 
plain management services and hydrologic studies. Table 
19-L provides a specific list and respective fiscal year 
expenditures. 
56. CONTINUATION OF PLANNING AND 
ENGINEERING. 
Fiscal year cost was $243,584 which includes three 
local protection projects and one flood control reservoir. 
Table 19-L provides a specific list and respective fiscal 
year expenditures. 
57. ADVANCED ENGINEERING AND 
DESIGN. 
Fiscal year cost was $1,113,235 which includes one 
navigation project, two local protection projects and one 
flood control reservoir. Table 19-L provides a specific list 
and respective fiscal year expenditures. 
19-10

TULSA, OKLAHOMA, DISTRICT 
TABLE 19-A COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep 30, 1987' 
1. McClellan-Kerr Arkansas New Work 
River Navigation System, 
OK, (Tulsa District 
Portion)* 
3. Arcadia Lake, OK 
5. Arkansas-Red River Basins 
Chloride Control, OK 
and TX 
5a. Area V, Estelline Springs, 
TX 
5b. Area VIII, TX 
6. Birch Lake, OK 
7. Candy Lake, OK 
8. Canton Lake, OK 
9. Copan Lake, OK 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint . 
Approp 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
- 130,936,6389 
- 130,936,638' 
6,540,500 7,600,266 8,635,900 3,022,850 113,377,9612 
6,403,180 7,865,411 9,120,610 2,995,992 108,884,6832 
3,800,000 9,330,000 6,646,000 6,300,000 79,840,289 
8,967,266 9,687,358 11,417,121 6,092,367 79,518,244 
5,215 
6,000 
5,425 
437 
43,000 
42,891 
100 
-315 
182 
3,146 
4,410 
168,700 
142,836 
168,800 
142,521 
- 25,705,208 
330,844 26,035,536 
222,000 3,524,615 
222,000 3,637,940 
- 300,028 
- 300,028 
5,500 
4,791 
4,600 
4,233 
6,000 
5,882 
1,829,000 -33,000 943,000 
1,527,050 562,003 601,912 
- - 127,300 
- - 127,232 
177 
529,200 658,700 595,000 
489,132 735,047 611,520 
- 
2,908 
120 
1,663 8,285 
435 
1,660 
137,511 
152,179 
- 46,493,000 
- 45,630,415 
459,500 
457,269 
586,800 
584,501 
- 13,549,170 
- 13,549,296 
615,400 5,498,8012 
611,826 8,794,655 2 
- 4,949,9222 
47,590 4,919,4422 
- 11,209,834 
- 10,918,727 
1,048,700 1,695,800 1,188,500 1,146,922 16,910,794 
1,072,826 1,766,592 1,297,427 1,142,413 16,981,3952 
- 8,663,000 3,092,000 450,000 88,676,999 
- 104,440 8,531,025 1,050,879 725,909 89,506,659 
316,200 516,700 491,000 587,100 2,118,000 
305,573 507,386 501,204 609,896 2,103,067 
19-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 19-A 
(continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep 30, 19871 
10. Council Grove Lake, KS New Work 
11. El Dorado Lake, KS 
12. Elk City Lake, KS 
13. Fall River Lake, KS 
14. Fort Supply Lake, OK 
16. Great Bend, KS 
17. Great Salt Plains Lake, OK 
18. Halstead, KS 
19. Heyburn Lake, OK 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
- - 2,940 
66 -2,940 
- 11,810,509 
- 11,810,509 
615,866 864,200 856,000 1,420,122 10,159,7442 
565,348 899,513 876,525 1,444,285 10,126,1602 
5,300,000 2,370,000 
2,096,205 3,491,995 
319,000 
312,064 
741 
710,266 
734,948 
1,412,317 
- 90,371,468 
453,181 89,882,234 
355,700 319,800 329,100 1,975,200 
371,549 338,798 328,807 1,969,832 
- - - 19,052,990 
- - - 19,052,990 
601,700 870,500 
532,204 917,213 
654,300 8,987,7062 
686,243 8,950,8662 
- 10,550,873 
- 10,550,873 
651,020 791,600 835,800 
640,445 587,760 1,091,136 
696,600 9,243,195 
703,723 9,405,940 
- 7,724,134 
- 7,723,127 
476,000 624,000 
487,499 634,882 
671,000 
687,903 
622,600 8,786,8732 
619,807 8,756,3572 
- 220,000 
- 126,531 
220,000 
126,531 
- 4,626,270 
- 4,626,270 
272,900 458,000 
291,510 307,513 
479,200 
636,153 
370,600 5,535,907 
366,615 5,525,713 
- 250,000 
- 156,920 
-1,900 - - 
3,971 - - 
461,170 463,100 495,200 
431,927 600,987 531,820 
250,000 
156,920 
- 2,560,572 
- 2,560,572 
610,400 7,277,7232 
564,381 7,326,3482 
19-12

TULSA, OKLAHOMA, DISTRICT 
TABLE 19-A 
(continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep 30, 19871 
20. Hugo Lake, OK 
21. Hulah Lake, OK 
22. John Redmond Dam and 
Reservoir, KS 
23. Kaw Lake, OK 
24. Lake Kemp, TX 
25. Lake Wichita, 
Holliday Creek, TX 
26. Marion, KS 
27. Marion Lake, KS 
29. Oologah Lake, OK 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
Min Rehab 
Approp 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
20,000 
3,128 -279,088 
- - 37,759,742 
- 1,868 37,427,111 
985,721 1,186,900 1,217,600 2,712,122 13,091,2502 
1,447,283 1,103,885 1,264,286 2,597,490 12,761,8082 
-2,400 
15,130 2,500 
615,970 878,300 291,600 
484,631 835,107 497,400 
- 11,388,150 
- 11,182,433 
642,100 9,778,9792 
648,068 9,729,1372 
- - - - 135,718 
- - - - 135,718 
- - - - 28,151,515 
- - - - 28,151,515 
1,202,000 3,776,066 1,380,600 1,009,622 16,043,2772 
850,643 4,123,729 1,563,663 892,125 16,001,0572 
-71,900 
214,312 -4,518 143,616 
- 109,430,750 
5,264 109,426,562 
1,145,800 1,454,800 1,714,200 2,118,422 15,120,0902 
1,165,463 1,407,293 2,080,047 2,139,648 15,067,2832 
- - - - 7,637,702 
- - - - 7,637,702 
141,000 
130,672 
148,600 138,000 
136,531 172,196 
118,300 1,666,534 
120,895 1,665,178 
- 805,000 
- 677,910 
339 
71,000 
70,236 
7,227 29,616 
839 
797,434 986,600 719,300 
730,648 1,028,180 789,868 
-4,000 
30,049 
805,000 
677,910 
- 5,519,200 
1,931 486,980 
- 13,420,817 
- 13,420,817 
831,500 10,213,9462 
830,572 10,181,8212 
- 46,722,3293 
- 46,721,5563 
1,154,400 1,168,900 1,179,000 1,252,522 16,420,6262 
1,074,913 1,200,842 1,306,646 1,246,801 16,878,0272 
19-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 19-A 
(continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY84 FY 85 FY 86 FY87 Sep 30, 19871 
30. Optima Lake, OK New Work 
31. Parker Lake, OK 
32. Pat Mayse Lake, TX 
33. Pearson-Skubitz 
Big Hill Lake, KS 
34. Pine Creek Lake, OK 
35. Sardis Lake, OK 
36. Skiatook Lake, OK 
37. Toronto Lake, KS 
39. Waurika Lake, OK 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp. 
Cost 
Main 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
- 10,000 
1,201 
420,368 442,400 485,500 
455,925 455,332 490,736 
- 47,173,438 
- 47,273,438 
451,500 3,654,522 
448,801 3,684,694 
- 961,000 
- 55,496 
961,000 
55,496 
- 9,310,661 
- 9,310,661 
848,900 1,185,400 930,000 
620,839 1,347,577 1,018,712 
- -241,000 
45,090 -147,645 
548,000 603,900 797,600 
504,413 590,428 825,038 
188,400 134,740 
100,486 154,343 45,998 
865,870 927,600 924,900 
645,695 1,008,083 1,065,137 
1,288,000 - 122,000 7,453,000 
-27,969 696,504 1,055,291 
395,000 451,100 673,700 
378,047 451,528 671,787 
10,000,000 2,375,000 
8,804,556 5,499,255 1,041,357 
- 218,400 578,600 
- 202,153 524,973 
652,800 9,426,1092 
689,368 9,404,8572 
- 16,879,166 
- 16,879,165 
767,300 3,668,2002 
786,870 3,669,3902 
- 20,628,0492 
22,313 20,628,0492 
780,800 9,198,558 
768,370 9,117,598 
572,000 61,328,479 
3,607,419 57,348,562 
665,350 2,490,150 
690,076 2,477,438 
230,000 103,748,282 
509,874 103,668,657 
609,700 1,406,700 
639,033 1,366,159 
- 13,896,324 
- 13,896,324 
264,000 188,000 301,000 
268,588 213,803 292,120 
1,314 - 12,313 24,340 
776,500 727,100 938,200 
730,723 770,961 958,274 
400,500 4,761,003 
410,820 4,758,272 
- 67,080,050 
29,910 66,957,608 
901,922 6,503,2662 
899,739 5,488,9752 
19-14 
40

TULSA, OKLAHOMA, DISTRICT 
TABLE 19-A 
(continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep 30, 1987 
40. Wister Lake, OK 
44. Broken Bow Lake, OK 
45. Eufaula Lake, OK 
46. Fort Gibson Lake, OK 
47. Grand Lake O' the 
Cherokees, OK 
48. Keystone Lake, OK 
49. Lake Texoma (Denison 
Dam), OK and TX 
50. Robert S. Kerr Lock 
& Dam & Reservoir, OK 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
Min Rehab 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
- 10,501,226 
- 10,501,226 
500,614 735,900 718,400 
468,971 742,409 777,134 
774,500 9,208,959 
758,208 9,186,187 
- - - - 41,222,692 
- - - - 41,222,692 
1,213,463 1,527,500 1,274,100 1,334,022 15,212,441 
1,809,738 1,629,880 1,393,509 1,342,585 15,192,058 
- 850,000 478,000 
200 37,645 287,346 
192,000 123,350,7475 
786,814 122,931,3495 
2,495,070 2,737,100 3,137,400 3,771,922 42,489,2662 
2,619,134 2,849,316 3,319,004 3,751,284 39,481,2292 
- 14,000 
35,489 
- 42,591,2986 
6,625 - 43,497,7916 
2,378,281 2,685,400 2,898,800 3,239,622 39,038,2882 
2,391,757 2,645,762 3,187,330 3,144,482 40,286,1782 
- - - - 52,126 
- - - - 52,126 
500 
23,500 
1,800 100 6,200 
6,488 
232,608 
232,552 
- 123,170,1737 
- 123,170,675' 
2,148,600 2,953,264 2,681,300 3,081,022 33,208,8522 
2,163,686 3,041,800 2,844,576 3,033,653 33,227,1362 
54,400 
128,434 
- 68,168,9604 
15,512 - 68,019,1094 
5,006,165 6,254,300 5,070,800 4,593,222 70,782,0702 
5,444,478 6,640,360 5,433,240 4,534,606 70,639,2462 
- - - - 46,237 
- - - - 46,237 
- - - - 94,578,237 
- - - - 94,578,237 
2,234,200 2,562,400 2,452,000 2,413,300 33,713,1362 
2,014,661 2,669,319 2,510,997 2,531,516 33,307,7582 
19-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 19-A 
(continued) COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep 30, 1987' 
51. Tenkiller Ferry New Work 
Lake, OK Approp - 58,000 - - - 24,017,720 
Cost 35,249 - - - 24,057,7188 
Maint 
Approp 2,194,416 2,392,800 2,927,600 3,115,037 33,170,8142 
Cost 2,110,520 2,674,605 3,081,392 3,178,124 33,149,6752 
53. Webbers Falls Lock New Work 
& Dam, OK Approp - - - - 83,738,277 
Cost - - - - 83,738,701 
Maint 
Approp 1,869,900 2,282,026 3,561,800 2,341,900 34,460,9642 
Cost 2,252,816 2,445,589 3,867,890 2,368,464 34,563,3602 
*These figures represent the total investment for the Tulsa special funds. 
District in the McClellan-Kerr Arkansas River Navigation 4. Includes $433,539 Emergency Relief funds. Exchange 
System in Oklahoma. These values include all features of the $1,256,068 from special contributed funds. 
navigation system as listed in Section 1 of the text. Projects 5. Excludes $299,803 contributed funds and $13,211,728 
which include power are also shown in their respective section of special funds. 
this report. 6. Excludes $134,919 contributed funds. Includes $49,581 
1. Includes funds ($2,077,900) expended by the Jobs Act Public Works acceleration funds. 
(P.L. 98-8, dated March 24, 1983) for projects listed in Table 19-M 7. Excludes $5,366,231 special funds. 
of the Fiscal Year 1985 Annual Report. 8. Excludes $946 contributed funds. Includes $39,999 
2. Beginning fiscal year 1984, data shown on Table A Public Works acceleration funds. 
includes special recreation use fees. Data for previous fiscal 9. Corrected amount. Includes $12,700,038 for Bank 
years have been changed to conform to the new procedure. Stabilization and Channel Rectification. 
3. Excludes $81,460 contributed funds and $1,348,816 
TABLE 19-B AUTHORIZING LEGISLATION 
See Date of Project 
Section Authorizing and Work 
In Text Act Authorized Documents 
1. July 24, 1946 McCLELLAN-KERR ARKANSAS RIVER HD 79-758, PL 525 
NAVIGATION SYSTEM 
3. December 31, 1970 
October 22, 1976 
4. November 17, 1986 
October 23, 1962 
November 7, 1966 
December 31, 1970 
6. October 23, 1962 
7. October 23, 1962 
8. June 28, 1938 
July 24, 1946 
June 30, 1948 
9. October 23, 1962 
10. May 17, 1950 
11. October 27, 1965 
12. August 18, 1941 
13. August 18, 1941 
ARCADIA LAKE 
Change water quality to water supply 
ARKANSAS CITY 
ARKANSAS-RED RIVER BASINS CHLORIDE 
CONTROL 
Authorized Area V (Estelline Springs) 
Authorized Areas VII, VIII and X 
Authorized Areas I, II-III, VI, IX, XIII, XIV, and XV 
BIRCH LAKE 
CANDY LAKE 
CANTON LAKE 
Approved Irrigation Storage 
Approved Water Supply Storage 
COPAN LAKE 
COUNCIL GROVE LAKE 
EL DORADO LAKE 
ELK CITY LAKE 
FALL RIVER LAKE 
HD 91-299 
PL 94-587 
PL 99-662 
SD 87-107 
PL 89-789, SD 110 
PL 91-611 
HD 87-563 
HD 87-563 
HD 75-569 
HD 87-563 
HD 80-442 
HD 89-232 
HD 76-440 
HD 76-440 
19-16 
5. 
5.a 
5.b

TULSA, OKLAHOMA, DISTRICT 
TABLE 19-B 
(continued) AUTHORIZING LEGISLATION 
See Date of Project 
Section Authorizing and Work 
In Text Act Authorized 
14. 
15. 
16. 
17. 
18. 
19. 
20. 
21. 
22. 
July 30,1983 
45. July 3,1958 
October 23,1962 
46. July 24,1946 
June 22,1936 
November 17,1986 
November 17,1986 
June 22,1936 
November 17,1986 
July 24,1946 
July 24,1946 
June 22,1936 
May 17,1950 
February 15,1958 
October 23, 1962 
October 23,1962 
November 17,1986 
Section 201 
May 17,1950 
November 17,1986 
June 28,1938 
June 22,1936 
October 23,1962 
October 23, 1962 
November 10,1978 
July 3, 1958 
October 23,1962 
December 4,1981 
October 23,1962 
August 18,1941 
November 17,1986 
December 30,1963 
November 17,1986 
June 28,1938 
FORT SUPPLY LAKE 
FRY CREEK 
GREAT BEND 
GREAT SALT PLAINS LAKE 
HALSTEAD 
HEYBURN LAKE AND POLECAT CREEK 
HUGO LAKE 
HULAH LAKE 
JOHN REDMOND DAM AND RESERVOIR 
Authorized name change 
KAW LAKE 
LAKE KEMP 
LAKE WICHITA, HOLLIDAY CREEK 
MARION, KS 
MARION LAKE 
MINGO CREEK 
OOLOGAH LAKE 
OPTIMA LAKE 
PAT MAYSE LAKE 
PEARSON-SKUBITZ BIG HILL LAKE 
Authorized name change 
PINE CREEK LAKE 
SARDIS LAKE 
Authorized name change 
SKIATOOK LAKE 
TORONTO LAKE 
UPPER LITTLE ARKANSAS RIVER 
WAURIKA LAKE 
W. D. MAYO LOCK AND DAM 
WISTER LAKE 
Conservation pool elevation changed 
BROKEN BOW LAKE 
EUFAULA LAKE 
19-17 
Documents 
HD 74-308 
PL 99-662 
PL 99-662 
HD 74-308 
PL 99-662 
HD 80-290 
HD 79-602 
HD 74-308 
HD 80-442 
PL 85-327 
HD 87-143 
HD 87-144 
PL 99-662 
HD 91-256 
HD 80-442 
PL 99-662 
Committee Doc. 
No. 1, 75th 
Cong, 1st Session 
HD 74-308 
HD 88-71 
HD 87-472 
PL 95-265 
HD 85-170 
SD 87-145 
PL 97-88 
HD 87-563 
HD 76-440 
PL 77-228 
PL 99-662 
SD 88-33 
PL 88-253 
PL 99-662 
Committee Doc. 
No. 1, 75th 
Cong, 1st Session 
PL 98-63 
HD 85-170 
SD 87-137 
HD 79-758 
23. 
24. 
25. 
26. 
27. 
28. 
29. 
30. 
31. 
32. 
33. 
34. 
35. 
36. 
37. 
38. 
39. 
40. 
--

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 19-B 
(continued) AUTHORIZING LEGISLATION 
See Date of Project 
Section Authorizing and Work 
In Text Act Authorized Documents 
47. August 18,1941 FORT GIBSON LAKE HD 76-107 
July 24, 1946 Incorporated into the multiple-purpose plan 
for the Arkansas River Basin 
November 17,1986 Hydropower Units 5 and 6 PL 99-662 
48. August 18,1941 GRAND LAKE O' THE CHEROKEES HD 76-107 
July 24, 1946 Incorporated into the multiple-purpose plan PL 76-228 
for the Arkansas River 
49. May 17,1950 KEYSTONE LAKE SD 81-07 
50. LAKE TEXOMA (Denison Dam) 
June 28, 1938 Flood control and power HD 75-541 
October 17,1940 Navigation and regulating flows PL 76-868 
September 30, 1944 Authorized name PL 78-454 
August 14,1953 Water supply PL 83-273 
November 17, 1986 Recreation PL 99-662 
51. November 17,1986 PARKER LAKE PL 99-662 
52. July 24,1946 ROBERTS. KERR LOCK AND DAM AND RESERVOIR HD 79-758 
July 8,1963 Authorized name change PL 88-62 
53. June 28,1938 TENKILLER FERRY LAKE Committee Doc. 
No. 1, 75th 
Cong., 1st Sess. 
June 24,1946 Power HD 79-758 
54. July 24,1946 WEBBERS FALLS LOCK AND DAM HD 79-758 
TABLE 19-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Poteau River Navigation Project, OK and AR Complete 1983 536,952 0 
Red River from Fulton, AR, to Mouth of Washita River Complete 1924 378,574 182,157 
TABLE 19-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Arkansas River Project 
Augusta L.P.P., KS1 
Big Pine Lake, TX 
Boswell Lake, OK 
Cherry and Red Fork Creeks L.P.P., OK 
Crutcho Creek L.P.P., OK 
Enid L.P.P., OK 
Flat Rock Creek, Tulsa, L.P.P., OK 2 
Florence L.P.P., KS 
Hutchinson L.P.P., KS 
Deferred 
Complete 
Deferred 
Deferred 
Complete 
Deferred 
Complete 
Complete 
Complete 
Complete 
1986 
1938 
1984 
1952 
1970 
1972 
1963 
1975 
1965 
1956 
1,701,670 
261,448 
213,016 
743,612 
1,741,000 
369,782 
3,497,718 
84,217 
14,599 
19-18

TULSA, OKLAHOMA, DISTRICT 
TABLE 19-E 
(continued) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Iola L.P.P., KS Complete 1939 22,290 - 
Jenks L.P.P., OK Complete 1950 344,797 - 
Lukfata Lake, OK Inactive 1983 1,424,685 - 
Oklahoma City L.P.P., OK Complete 1960 8,047,512 - 
Red River Bank Stabilization Below Denison Complete 1953 222,105 - 
Sand Creek L.P.P., KS Complete 1968 545,996 - 
Sand Lake, OK Deferred 1963 - - 
Shidler Lake, OK Deferred 1983 568,191 - 
Tulsa/West Tulsa L.P.P., OK Complete 1954 2,785,070 - 
Turtle Creek L.P.P., Yukon, OK Deferred 1975 144,853 - 
Tuskahoma Lake, OK Inactive 1963 - - 
West Branch Chisholm Creek L.P.P., KS Complete 1965 364,200 - 
Wichita and Valley Center L.P.P., KS Complete 1960 12,247,379 - 
Winfield L.P.P., KS' Complete 1937 - - 
L.P.P. - Local Protection Project. 
1. Completed by Kansas Works Progress Administration. 
2. Federal cost limited to $1,000,000. 
TABLE 19-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Date Federal Contributed 
See Annual and Funds Funds 
Project Report For Authority Expended Expended 
Cedar Point Lake, KS 1980 November 17, 1986 0 0 
Public Law 99-662 
Cow Creek, Hutchinson, KS 1971 November 17, 1986 363,720 0 
Public Law 99-662 
El Dorado, West Branch, 1977 November 17, 1986 92,319 0 
Walnut River, KS Public Law 99-662 
Neodesha Lake, KS 1952 November 17, 1986 97,910 0 
Public Law 99-662 
Towanda Lake, KS 1981 November 17, 1986 392,361 0 
Public Law 99-662 
TABLE 19-H ARKANSAS RIVER BASIN MULTIPLE-PURPOSE PLAN 
(See Section 1 of Text) 
Feature River River Mile Nearest Town 
North Canadian 
Elk River 
Canadian 
Fall River 
394.3 
8.7 
27.0 
54.2 
Canton, OK 
Elk City, KS 
Eufaula, OK 
Fall River, KS 
19-19 
LAKES 
Canton 
Elk City 
Eufaula 
Fall River

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 19-H ARKANSAS RIVER BASIN MULTIPLE-PURPOSE PLAN 
(continued) (See Section 1 of Text) 
Feature River River Mile Nearest Town 
Fort Gibson Grand (Neosho) 7.7 Fort Gibson, OK 
Grand Lake 0' the Cherokees Grand (Neosho) 77.0 Disney, OK 
Keystone Arkansas 538.8 Sand Springs, OK 
Lake Hudson (Markham Ferry) Grand (Neosho) 47.4 Locust Grove, OK 
Neodesha Verdigris 222.8 Neodesha, KS 
Oologah Verdigris 90.2 Oologah, OK 
Tenkiller Ferry Illinois 12.8 Gore, OK 
Toronto Verdigris 271.5 Toronto, KS 
Wister Poteau 60.9 Wister, OK 
McCLELLAN-KERR ARKANSAS RIVER NAVIGATION SYSTEM, OK' 
(Tulsa District Portion) 
Bank Stabilization and Channel Rectification Verdigris and Arkansas N/A2 Fort Smith, AR, to Catoosa, OK 
Chouteau Lock and Dam (17), OK Verdigris 401.5 Okay, OK 
Lock and Dam 13, AR Arkansas 292.8 Fort Smith, AR 
Newt Graham Lock and Dam (18), OK Verdigris 421.6 Inola, OK 
Robert S. Kerr Lock and Dam (15), OK Arkansas 339.0 Sallisaw, OK 
Robert S. Kerr Marine Terminal, OK Arkansas 336.2 Cowlington, OK 
Sans Bois Navigation Channel, OK Sans Bois Creek 341.0 Keota, OK 
W. D. Mayo Lock and Dam (14), OK Arkansas 319.6 Redland, OK 
Webbers Falls Lock and Dam (16), OK Arkansas 366.6 Gore, OK 
1. Navigation miles - McClellan-Kerr Arkansas River Navigation System. 
2. As required for channel 9 feet deep. 
TABLE 19-I INSPECTION OF COMPLETED LOCAL FLOOD 
PROTECTION PROJECTS 
(See Section 42 of Text) 
Projects Inspected in Fiscal Year Inspection Date 
Cherry and Red Fork Creeks, OK December 1986 
Deep Fork River, OK April 1987 
Dodge City, KS October 1987 
Enid, OK November 1985 
Flat Rock Creek, OK December 1986 
Florence, KS December 1986 
Hutchinson, KS May 1987 
Iola, KS February 1987 
Jenks, OK October 1987 
Joe Creek, OK October 1987 
Lamed, KS December 1986 
Marion, KS December 1986 
Oklahoma City, OK November 1986 
Park City, KS May 1987 
Sand Creek, Newton, KS December 1986 
South Deer Creek, OK October 1986 
Tulsa/West Tulsa, OK October 1987 
Wichita and Valley Center, KS May 1987 
19-20

TULSA, OKLAHOMA, DISTRICT 
TABLE 19-K FLOOD CONTROL WORK 
UNDER SPECIAL AUTHORIZATION 
(See Section 43 of Text) 
Fiscal Year 
Study Identification/Name Cost 
SMALL FLOOD CONTROL PROJECTS NOT SPECIFICALLY 
AUTHORIZED BY CONGRESS (Section 205) 
Blackboy Creek, Tulsa, OK 3,565 
Caney River, Bartlesville, OK 19,348 
Coal Creek, Henryetta, OK 42,901 
Coweta Creek, Coweta, OK 14,895 
East Cache Creek, Lawton, OK 38,622 
Fort Gibson, OK 4,239 
Garden City, Tulsa, OK 4,171 
Haikey Creek, Tulsa, OK 6,662 
Lamed, KS 102 
Line Creek and Washita River 286 
Little Wichita River, Clay County, TX 4,757 
Main Branch Chisholm Creek, Park City, KS 6,936 
Merkle Creek, Norman, OK 44,400 
North Canadian River Wastewater Plant, Oklahoma City, OK 5,761 
Rock Creek, Sapulpa, OK 7,458 
Spunkey Creek, Catoosa, OK 10,000 
Squirrel Creek, North Canadian River, Shawnee, OK 35,019 
Squirrel Hollow Creek, Sand Springs, OK 36,304 
Tar Creek, Miami, OK 37,852 
Turkey Creek, Bartlesville, OK 40,044 
Whiskey and Rock Creeks, Independence, KS 19,894 
Whitewater and Walnut River, Augusta, KS 50,276 
TOTAL SMALL FLOOD CONTROL PROJECTS 433,491 
EMERGENCY STREAMBANK AND SHORELINE PROTECTION (Section 14) 
Baron Fork (Camp Egan), OK 170,665 
Camp Creek, Pawnee County, OK 799 
Chikaskia River, Blackwell, OK 9,906 
Coon Creek, Washington County, OK 3,915 
Deer Creek, Custer County, OK 5,544 
Labette County Bridge, Neosho, KS 3,888 
Murray County Bridge, OK 2,504 
North Canadian River, 11th Street Bridge, Yukon, OK 9,828 
North Canadian River, Okfuskee County (SR 84), OK 9,646 
North Pease River, Road 656 Bridge, Motley, OK 9,595 
Salt Fork, Red River, Elmer, OK 137,796 
Sewage Lagoon, Washita River, OK 196,688 
State Highway 48, North Canadian River, Okfuskee County, OK 6,689 
Verdigris River City Dam, Independence, KS 23,173 
Washington County Bridge, Caney River, OK 7,300 
Washita River, Anadarko, OK 101,789 
Washita River, Caddo County, OK 3 
Water Supply Wells, South Canadian River, OK 6,689 
TOTAL EMERGENCY STREAMBANK AND SHORELINE PROTECTION 706,418 
FLOOD CONTROL AND COASTAL EMERGENCIES, REHABILITATION 
Flood Control and Coastal Emergencies 5,194 
Joe Creek Channel Improvement, Tulsa County, OK 6,295 
Lawrence Levee 5,995 
Neosho Drainage District/R. King Levee 7,233 
Tulsa/West Tulsa Levee, OK 334,929 
Earl Maybee Levee, Bird Creek 434 
TOTAL FLOOD CONTROL AND COASTAL EMERGENCIES, REHABILITATION 360,080 
19-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 19-L GENERAL INVESTIGATIONS 
(See Sections 54, 55, 56, and 57 of Text) 
Fiscal Year 
Study Identification/Name Cost 
SURVEYS 
Navigation Studies 
Central Oklahoma Project 2,226 
Flood Damage Prevention Studies 
Arkansas River, Great Bend, KS, to Tulsa, OK 483,715 
Arkansas River Basin, AR and OK 227,254 
Canadian River Basin, OK, TX, and NM 163,462 
Grand (Neosho) River Basin, KS and OK 127,434 
Lake Texoma, OK and TX 95,258 
Red River Above Denison, TX and OK 172 
Verdigris River Basin 133,536 
Arkansas-Red River Basins Solar Energy Investigations 278 
Comprehensive Studies 
Arkansas River and Tributaries, South Central-Southeast Areas, OK 781,594 
Red River Basin, AR, TX, LA, and OK 1,256,523 
Review of Authorized Projects 
Restudy of Deferred Projects 
Lukfata Lake, OK 49,880 
Winfield, KS 83,551 
Review of Completed Projects 
Hugo Lake, OK 123,208 
Pine Creek Lake, OK 28,339 
Review for Deauthorization 
Crutcho Creek, OK 479 
Inventory of Dams - Special Investigations 51,747 
Coordination with Other Federal Agencies, States, and Non-Federal Interests 
Soil Conservation Service 3,630 
Bureau of Reclamation 5,666 
Planning Assistance to States - Texas 19,142 
Planning Assistance to States- Kansas 46,809 
Planning Assistance to States- Oklahoma 158,790 
TOTAL SURVEYS 3,842,692 
COLLECTION AND STUDY OF BASIC DATA 
Flood Plain Management Services 
Flood Plain Management Services 92,891 
Technical Services General 130,466 
Tulsa Forecast Maps 13,743 
Hydrologic Studies 
Storm Studies 1,698 
TOTAL COLLECTION AND STUDY OF BASIC DATA 238,798 
CONTINUATION OF PLANNING AND ENGINEERING 
Local Protection 
Arkansas River, Great Bend to Tulsa, Halstead 64 
Lake Wichita, Holliday Creek, McGrath Creek, TX - 272 
Lake Wichita, Holliday Creek, TX 29,875 
Flood Control Reservoirs 
Parker Lake, OK 213,916 
TOTAL CONTINUATION OF PLANNING AND ENGINEERING 243,584 
19-22

TULSA, OKLAHOMA, DISTRICT 
TABLE 19-L GENERAL INVESTIGATIONS 
(continued) (See Sections 54, 55, 56, and 57 of Text) 
Fiscal Year 
Study Identification/Name Cost 
ADVANCED ENGINEERING AND DESIGN 
Navigation Project 
Big and Little Sallisaw Creeks, OK 193 
Local Protection 
Great Bend, KS 325,646 
Mingo Creek, OK (CP&E) 564,073 
Flood Control Reservoirs 
Douglass Lake, KS 223,324 
TOTAL ADVANCED ENGINEERING AND DESIGN 1,113,235 
19-23

KANSAS CITY, MO., DISTRICT * 
The district comprises a portion of southwestern Iowa; 
northwestern, central, and western Missouri; northern Kansas; 
southern Nebraska; and a portion of northeastern 
Colorado embraced in drainage basin of the Missouri River 
and tributaries from Rulo, Nebraska, to the mouth. Report 
on navigation project for section of Missouri River from 
Sioux City, Iowa, to Rulo, Nebraska, is in report of Omaha 
District. 
IMPROVEMENTS 
Navigation 
1. Missouri River, Sioux City, IA to 
Mouth (Rulo, NE, to Mouth)......... 
Flood Control 
2. Blue River Channel, Kansas City, MO . 
3. Brush Creek, Kansas City, MO....... . 
4. Clinton Lake, Wakarusa River, KS .... 
5. Harlan County Lake, Republican 
River, NE ......................... 
6. Hillsdale Lake, Big Bull Creek, KS.... 
7. 
8. 
....... 20-2 
....... 20-2 
....... 20-2 
....... 20-2 
....... 20-3 
....... 20-3 
Kanopolis Lake, Smoky Hill River, KS ........ 20-3 
Little Blue River Channel Improvement, 
Little Blue River, MO ..................... 20-3 
9. Little Blue River Lakes, MO .............. 20-4 
10. Long Branch Lake, Little Chariton 
River, M O ............. .................. 20-4 
11. Melvern Lake, Marais des Cygnes 
(Osage) River, KS ........................ 20-4 
12. Milford Lake, Republican River, KS .......... 20-5 
13. Missouri River Levee System, IA, NE, 
KS, and MO (Rulo, NE to Mouth)............20-5 
14. Perry Lake, Delaware River, KS ............ 20-5 
15. Pick-Sloan Missouri Basin Program 
(Kansas City Dist.) .......................... 20-5 
16. Pomme de Terre Lake, Pomme de Terre 
River, M O ............... ................ 20-6 
17. Pomona Lake, One Hundred Ten Mile 
Creek, KS ................. .............. 20-6 
18. Rathbun Lake, Chariton River, IA............ 20-6 
19. Smithville Lake, Little Platte River, MO ...... 20-6 
20. Thttle Creek Lake, Big Blue River, KS ........ 20-6 
21. Wilson Lake, Saline River, KS .............. 20-7 
Flood Control (cont.) Page 
22. Scheduling Flood Control 
Reservoir Operations......................20-7 
23. Inspection of Completed Flood 
Control Projects..........................20-7 
24. Inspection of Non-Federal Levees ............ 20-7 
25. Flood Control Work Under Special 
Authorization ............................. 20-7 
Multiple Purpose Projects Including Power 
26. Harry S. Truman Dam and Reservoir, 
Osage River, MO .............. ............ 20-8 
27. Stockton Lake, Sac River, MO ............... 20-9 
General Investigations 
28. General Investigations.....................20-9 
Tables 
Table 20-A Cost & Financial Statement..........20-10 
Table 20-B Authorizing Legislation ............ 20-13 
Table 20-C Other Authorized Navigation 
Projects.............. ............ 20-16 
Table 20-D Not Applicable 
Table 20-E Other Authorized Flood Control 
Projects ............ ............. 20-17 
Table 20-F Not Applicable 
Table 20-G Deauthorized Projects .............. 20-18 
Table 20-H Missouri River Levee System ........ 20-19 
Table 20-I Kansas City District Projects 
Included in Pick-Sloan Missouri 
Basin Program ..................... 20-20 
Table 20-J Inspection of Completed Flood 
Control Projects .................... 20-20 
Table 20-K Active General Investigations ........ 20-21 
Table 20-L Flood Control Activities Under 
Special Authorization ............... 20-22 
20-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. MISSOURI RIVER, SIOUX CITY, IA, 
TO MOUTH (RULO, NE, TO MOUTH) 
Location. Jefferson, Madison, and Gallatin Rivers conjoin 
at Three Forks, Montana, to form the Missouri River, 
which flows southeasterly 2,315 miles (1960 mileage) across 
or along seven states to the Mississippi River, 17 miles above 
St. Louis. For description see page 1149, Annual Report 
for 1932. The river is commercially navigable from Sioux 
City Iowa, to the mouth, a distance of 732 miles. The portion 
of project in Kansas City District extends from Rulo, 
Nebraska, to the mouth, a distance of 498 miles. 
Previous Projects. For details see page 1891 of Annual 
Report for 1915, and pages 1153 and 1175 of Annual Report 
for 1938. 
Existing Project. A channel of 9-foot depth and width 
not less than 300 feet, obtained by revetment of banks, construction 
of permeable dikes to contract and stabilize the 
channel, cutoffs to eliminate long bends, closing minor channels, 
removal of snags, and dredging as required. The 
improved reach within the Kansas City District extends 
from the mouth to Rulo, Nebraska, a distance of 498.4 miles. 
The Bank Stabilization and Navigation features of the 
project were completed in September 1980. For the reach 
from Rulo, Nebraska, to the mouth, the total construction 
cost was $237,942,190 including $8,665,594 for previous 
project. River access sites have been completed at 11 locations. 
Ordinary and extreme fluctuations of stage are 16 
and 38 feet, respectively. 
Local cooperation. Cooperation from benefited localities 
may be required where any improvement may confer special 
benefit. The receipt of contributions from private parties 
are to be expended along with Government funds upon 
authorized work where such work would be in the interest 
of navigation, as authorized by 1915 Rivers and Harbors 
Act. Secretary of the Army approved general principle of 
cooperative construction on Missouri River below Kansas 
City on basis that 25 percent of cost of any special installation 
shall be paid by the United States and 75 percent by 
local interests. Total contributed by local interests in 
cooperation with the United States from 1918 to June 30, 
1964, was $675,663, of which $8,647 was returned to contributors. 
Local interests must share in cost of recreation 
facilities in accordance with provisions of the Federal Water 
Project Recreation Act of 1965. Local interests have contributed 
$171,816 for cost sharing on construction of recreation 
in addition to constructing portions of the facilities. 
Terminal facilities. A listing of terminal facilities are included 
in Missouri River Navigation Charts and can be obtained 
from Kansas City District Engineer for a small fee. 
Operations during fiscal year. The 1974 Base Line 
Study of the reach of the Missouri River in the Kansas City 
District estimated recreation use on the river at 1,250,000 
recreation days annually. The projected tonnage on the river 
for FY 1986 was approximately 2.3 million. Maintenance: 
Repair of dikes and revetments by contract (excluding sand, 
gravel, and waterway improvement materials). In addition, 
following work was accomplished by hired labor: Construction 
of environmental gaps and dike and revetment repair, 
real estate management, channel reconnaissance, condition 
studies, surveys and mapping, stream gauging, engineering 
and design, surveys and layout of construction, and 
supervision and administration. No dredging was necessary. 
Flood Control 
2. BLUE RIVER CHANNEL, 
KANSAS CITY, MO 
Location. Along the Blue River and tributaries in 
Jackson County, Missouri. 
Existing project. Preliminary plans consist of 12.5 miles 
of improved channel along the Blue River within Kansas 
City, Missouri. Estimated Federal cost through construction 
of the project (1987) is $174,000,000, and estimated 
non-Federal cost of lands, damages and relocations is 
$22,900,000. 
Local cooperation. Section 2, Flood Control Act of 
June 22, 1936 applies. The city of Kansas City, Missouri, 
passed a resolution of intent on December 9, 1975 to provide 
the required assurances of local cooperation when 
requested. The Section 221 agreement was signed by the 
Kansas City District Engineer on September 8, 1983. 
Operations during fiscal year. Preconstruction planning 
is complete and final designs are underway. The first and 
second channel contracts are complete. Relocation contracts 
had been negotiated with four railroad companies and construction 
is underway. 
3. BRUSH CREEK, KANSAS CITY, MO 
Location. A major tributary of the Blue River in westcentral 
Kansas City and extending into Johnson County, 
Kansas, draining a highly urbanized 29-square-mile area in 
the two states. 
Existing project. Preliminary plans consist of improving 
about 7,500 feet of the channel from near Roanoke 
Parkway downstream to near Troost Avenue in Kansas City. 
Estimated Federal cost through construction of the project 
(1987) is $13,100,000, and estimated non-Federal cost of 
lands, damages, and relocations is $4,300,000. 
Local cooperation. The city of Kansas City provided a 
letter of assurance, dated June 20, 1986, officially stating 
its intent and ability to cost share the project. 
Operations during fiscal year. Preconstruction engineering 
and design continues with activity in the Kansas 
City District and at the Waterways Experiment Station 
where model studies are underway to confirm design 
calculations. 
4. CLINTON LAKE, WAKARUSA 
RIVER, KS 
Location. Damsite is on Wakarusa River about 4 miles 
southwest of Lawrence, Kansas, in Douglas County. Lake 
extends into Shawnee and Osage Counties, Kansas. 
Exiting project. An earthfill dam about 9,250 feet long 
20-2

KANSAS CITY, MO., DISTRICT 
constructed to a height of about 114 feet with an uncontrolled 
spillway in left abutment. Total reservoir storage 
capacity 397,200 acre-feet (258,300 for flood control, 28,500 
for sediment reserve, and 110,400 of multipurpose storage 
for municipal and industrial waste supply and recreation). 
Cost of constructing the completed project was $57,415,433. 
Construction was initiated in January 1972, and the project 
was placed in operation in November 1977. 
Local cooperation. Section 2, Flood Control Act of 
June 28, 1938 applies. Reimbursement in the estimated 
amount of $6,768,000 is required for water supply storage 
in accordance with Water Supply Act of 1958. A contract 
was signed by the State on September 6, 1978 and was approved 
by the Secretary of the Army on October 30, 1978. 
Utilization of storage was initiated in December 1979. 
Repayment also began at that time. 
Operations during fiscal year. Visitation for FY 1987 
was 1,314,100 visitor days. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
5. HARLAN COUNTY LAKE, 
REPUBLICAN RIVER, NE 
Location. Dam is on main stem of Republican River 
about 235 miles above confluence of stream with Smoky 
Hill River. Site is in Harlan County, about 3 miles east of 
Republican City and 13 miles west of Franklin, Nebraska. 
Existing project. An earthfill dam about 107 feet above 
streambed with a total length of 11,827 feet, including a 
gate-controlled, concrete, gravity-type spillway section near 
center of dam. Reservoir provides storage capacity of 
850,000 acre-feet (500,000 for flood control and 350,000 for 
irrigation and sedimentation allowance). Initial cost of constructing 
the project was $45,279,532. Total Federal cost 
of project, including $1,017,623 for major rehabilitation 
work and $1,832,394 supplemental recreation development 
(Code 710), is $48,129,549. Construction of the project was 
initiated in August 1946. Project was placed in operation 
in December 1952. Major rehabilitation work was completed 
in FY 1968. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations during fiscal year. Visitation for FY 1987 
was 864,500 visitor days. Maintenance: Activities included 
ordinary operation and maintenance. 
6. HILLSDALE LAKE, BIG BULL 
CREEK, KS 
Location. The project is located approximately 12 miles 
above the mouth of Big Bull Creek, a tributary of the Marais 
des Cygnes River and about 15 miles southwest of the Kansas 
City metropolitan area in Miami County, Kansas. 
Existing project. An earthfill embankment about 11,600 
feet long (including approximately 3,300 feet of dike section) 
about 75 feet above rising valley flood plain. The 
spillway is gravity type uncontrolled and the outlet works 
are controlled. The total reservoir storage capacity is 
160,000 acre-feet (81,000 for flood control, 11,000 for sediment 
reserve, and 68,000 for multipurpose storage for water 
supply, water quality control, and recreation). Construction 
was initiated in December 1974 and project was placed in 
operation in October 1981. Federal cost of construction is 
$64,161,400. 
Local cooperation. Section 2, Flood Control Act 1938, 
applies. Local interests must make reimbursement of 
$23,342,756 for water supply storage in accordance with 
Water Supply Act of 1958. The Kansas Water Resources 
Board signed a contract in January 1974, approved by the 
Secretary of the Army in April 1974, for the entire 53,000 
acre-feet of water supply storage. Local interests have 
shown no interest in sponsoring recreational development 
at this time. Therefore, only minimum recreational facilities 
have been built. 
Operations during fiscal year. Visitation for FY 1987 
was 432,900 visitor days. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
7. KANOPOLIS LAKE, SMOKY 
HILL RIVER, KS 
Location. Dam is on Smoky Hill River about 19 miles 
west and 16 miles south of Salina, Kansas, and about 205 
river miles above mouth of stream. 
Existing project. An earthfill dam about 131 feet above 
streambed, having a total length of 15,360 feet, including 
4,070 feet of dike section on the left abutment and 2,550 
feet of dike section on right abutment. The reservoir provides 
storage capacity of 450,000 acre-feet, (400,000 for 
flood control and 50,000 for recreation and streamflow 
regulation). Outlet works and spillway are in right abutment. 
Initial cost of constructing the project was $12,327,735. 
Total Federal cost of project, including $249,492, supplemental 
recreational development (Code 710), is $12,577,227. 
Construction was initiated in June 1940 and project was 
placed in operation in May 1948. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations during fiscal year. Visitation for FY 1987 
was 530,500 visitor days. Maintenance: Activities included 
drain installation, acquisition of emergency rock stockpile, 
and ordinary operation and maintenance. 
8. LITTLE BLUE RIVER CHANNEL 
IMPROVEMENT, LITTLE BLUE 
RIVER, MO 
Location. The project is located along the Little Blue 
River and extends from the head of Missouri River Levee 
Unit R 351, 22 miles upstream to the vicinity of Wildwood 
Creek in Jackson County, Missouri. 
Existing project. The improvements consist of 
straightening and enlarging the Little Blue River channel 
from the head of Missouri River Levee Unit R 351, near 
Blue Mills Road, upstream to the vicinity of Wildwood 
Creek, reducing the length of this section from 20.4 to about 
15 miles. Alteration of six highway bridges and construction 
of five new highway bridges and one railroad bridge 
were required. Improvements in the vicinity of Lake City 
20-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Army Ammunition Plant consists of diversion of West Fire 
Prairie Creek into the Little Blue River and construction 
of a levee. Estimated Federal cost through construction of 
the project (1987) is $25,505,083 and estimated non-Federal 
cost is $3,390,000. Construction was initiated in December 
1974. 
Local cooperation. Section 3, Flood Control Act of 
June 22, 1936, applies to the Little Blue River channel improvement 
works. Jackson County, Missouri, passed a bond 
issue for sponsorship of the project. Assurances of local 
cooperation were furnished July 31, 1973. 
Operations during fiscal year. Project is physically complete, 
but not financially complete. 
9. LITTLE BLUE RIVER LAKES, MO 
Location. This project consists of two lakes in Jackson 
County, Missouri, located in Kansas City, Missouri, and 
suburban communities. The Blue Springs Lake site is on 
the East Fork of the Little Blue River about one-half mile 
south of U.S. Highway 40 and the Longview Lake site is 
on the main stem at approximately 109th Street. 
Existing project. The Blue Springs dam will be an earthfill 
embankment about 2,500 feet long and rising about 78 
feet above the streambed, with an uncontrolled service 
spillway and uncontrolled outlet conduit. The total reservoir 
storage capacity will be 26,600 acre-feet (15,700 for 
flood control, 10,600 for multipurpose storage for water 
quality and recreation, and 300 for sedimentation). 
The Longview dam is an earthfill embankment about 
1,900 feet long and rising about 120 feet above the streambed, 
with an uncontrolled service spillway and an uncontrolled 
outlet conduit. The total reservoir storage capacity 
will be 46,900 acre-feet (24,300 for flood control and 20,600 
for multipurpose storage for water quality and recreation, 
and 2,000 for sedimentation). Estimated Federal cost (1987) 
for both lakes through construction of the project is 
$140,500,000. Construction was initiated in September 
1977. 
Local cooperation. Section 2 of the Flood Control Act 
of June 28, 1938 applies. Local interests must share in 
separable cost allocated to recreation in accordance with 
Federal Water Project Recreation Act of 1965. The Jackson 
County Legislature approved a recreation cost-sharing contract 
on July 5, 1974 which was approved by the Secretary 
of the Army on June 24, 1976. A supplemental agreement, 
signed by Jackson County officials on June 5, 1978, and 
approved by the Secretary of the Army January 10, 1979, 
revised the existing contract to include additional costs 
involved in raising the multipurpose pool elevation at the 
Blue Springs Lake. Estimated reimbursement for recreation 
is $15,180,000 of which $420,000 will be accomplished 
during construction by local interests. 
Operations during fiscal year. Longview Lake is essentially 
complete except for recreation facilities. Blue Springs 
dam, recreation facilities, and administrative facilities are 
underway. Project is 96 percent complete. Land acquisition 
is complete. Maintenance: Activities consisted of ordinary 
operation and maintenance. 
10. LONG BRANCH LAKE, LITTLE 
CHARITON RIVER, MO 
Location. Damsite is on East Fork of Little Chariton 
River in north-central Missouri about 1 mile west of Macon 
in Macon County. 
Existing project. An earthfill dam about 3,800 feet long 
and about 71 feet high with an uncontrolled outlet conduit 
and an uncontrolled service spillway in right abutment. Total 
reservoir storage capacity will be 65,000 acre-feet (29,000 
for flood control, 4,000 for sediment reserve, and 32,000 of 
multipurpose storage for water supply, water quality control, 
fish and wildlife, and recreation). Estimated Federal 
cost (1987) is $20,391,000, and estimated non-Federal cost 
is $3,709,000. construction was initiated in March 1973. 
Project was placed in useful operation for flood control on 
September 1, 1980. 
Local cooperation. Section 2, Flood Control Act of 
June 28, 1938 applies. Local interests must make reimbursement 
of $5,573,000 for water supply storage in accordance 
with Water Supply Act of 1958 and share in separable 
cost of $3,709,000 allocated to recreation in accordance with 
Federal Water Project Recreation Act of 1965. On 
September 15, 1972 the Secretary of the Army approved 
a contract signed by the city of Macon, Missouri, for water 
supply and recreation development. Missouri State agencies 
indicated their intent to sponsor future water supply 
and signed a contract on June 17, 1977 to sponsor recreational 
development in lieu of city of Macon. After review 
by the Office of the Secretary of the Army, the state signed 
the contract in December 1979, and it was approved by the 
Secretary of the Army on April 18, 1980. 
Operations during fiscal year. Visitation for FY 1987 
was 643,800 visitor days. Construction of Stage 4 recreation 
facilities were initiated. Project is 99 percent complete 
on scheduled work. The remaining work is construction of 
recreation facilities. Maintenance: Activities consisted of 
acquisition of emergency rock stockpile and ordinary operation 
and maintenance. 
11. MELVERN LAKE, MARAIS DES 
CYGNES (OSAGE) RIVER, KS 
Location. Damsite is on Marais des Cygnes (Osage) River 
in Osage County, Kansas, about 2 miles west of Melvern, 
Kansas. 
Existing project. An earthfill dam about 9,700 feet long 
and about 98 feet high with an uncontrolled chute-type 
spillway in left abutment. Total reservoir storage capacity 
is 363,000 acre-feet (200,000 for flood control, 26,000 for 
sediment reserve, and 137,000 of multipurpose storage for 
water quality control, and recreation). Cost of constructing 
the completed project was $37,436,530. Construction was 
initiated in July 1967, and the project was placed in operation 
in August 1972. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Visitation for FY 1987 
was 705,700 visitor days. Maintenance: Activities consisted 
of installation of trilateration and ordinary operation and 
maintenance. 
20-4

KANSAS CITY, MO., DISTRICT 
12. MILFORD LAKE, REPUBLICAN 
RIVER, KS 
Location. Damsite is on Republican River near village 
of Alida and about 8 miles downstream from Milford, Geary 
County, Kansas, and about 10 miles above confluence of 
Republican and Smoky Hill Rivers which form Kansas River 
near Junction City, Kansas. 
Existing project. An earthfill dam about 6,300 feet long 
and 126 feet high with an uncontrolled service-chute 
spillway in a saddle on right abutment. Total reservoir 
storage capacity is 1,160,000 acre-feet (700,000 for flood 
control, 160,000 for sediment reserve and 300,000 of 
multipurpose storage for water supply, water quality control, 
and recreation). Water supply storage is included in 
project at request of Governor of Kansas under provisions 
of Federal Water Supply Act of 1958. Initial cost of constructing 
the completed project was $48,268,843. Total 
Federal cost of project, including $1,297,649 supplemental 
recreational development (Code 710), is $49,566,492. Construction 
was initiated in July 1961. Project was placed in 
operation in June 1965. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Local interests must make reimbursement of 
$13,045,576 for water supply storage in accordance with 
Water Supply Act of 1958. Utilization of storage has not 
been initiated. Reimbursement was initiated, at the option 
of the State, in September 1976. 
Operations during fiscal year. Visitation for FY 1987 
was 1,287,300 visitor days. Maintenance: Activities included 
initiation of buried collector system, road resurfacing in the 
Outlet Area, and ordinary operation and maintenance. 
13. MISSOURI RIVER LEVEE 
SYSTEM, IA, NE, KS, AND MO 
(RULO, NE, TO MOUTH) 
Location. On both banks of Missouri River from Sioux 
City, Iowa, about 760 miles to mouth near St. Louis, 
Missouri. Portion of project in Kansas City District 
extends from Rulo, Nebraska, 498 miles to mouth. 
Existing project. A series of levee units and appurtenant 
works along both sides of Missouri River from 
Sioux City, Iowa, to the mouth, for protection of agricultural 
lands and small communities against floods. 
Estimated cost (1987) for the active portion of the project 
from Rulo, Nebraska, to mouth is $110,760,000, 
including $100,950,000 Federal and $9,810,000 non- 
Federal contributions. Costs of $11,440,000 for lands 
and damages are to be borne by local interests. Remaining 
portion of project consists of units on which planning and 
construction are being delayed pending completion of 
restudy to assure that additional levee construction is 
economically justified. Cost estimate for deferred, 
inactive, and deauthorized portion of project Rulo, 
Nebraska, to mouth is $402,453,000 (1964 and 1987 price 
levels), of which $368,649,000 is Federal cost for construction 
and $33,804,000 for lands and damages to be borne 
by local interests. Construction of the project was initiated 
in June 1948. 
Local cooperation. Section 3, Flood Control Act of 1936 
applies. Fully complied with for all completed units and 
units under construction. Local sponsors provide all operation 
and maintenance. 
Operations during fiscal year. Status of individual units 
of active portion of project at end of fiscal year is shown 
in Table 20-H on Missouri River levee system. Contract for 
remedial work on L 246 was awarded. Planning on remaining 
active units continued. 
14. PERRY LAKE, DELAWARE 
RIVER, KS 
Location. Damsite is on Delaware River about 5 miles 
above mouth in Jefferson County, Kansas, about 3 miles 
north of Perry, Kansas 
Existing project. An earthfill dam about 7,750 feet long 
constructed to an elevation about 95 feet above valley floor 
with gated-outlet works and an uncontrolled spillway in left 
abutment. Total reservoir storage capacity is 770,000 acrefeet 
(480,000 for flood control, including 140,000 for sediment 
reserve and 150,000 of multipurpose storage for water 
supply, water quality control, and recreation). Water supply 
storage is included in project plan at request of State 
of Kansas under provisions of Federal Water Supply Act 
of 1958. Initial cost of constructing the completed project 
was $48,371,706. Total Federal cost of project, including 
$724,212 supplemental recreational development (Code 
710), is $49,095,918. Construction was initiated in March 
1964, and the project was placed in operation in January 
1969. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Local interests must make reimbursement of 
$9,208,342 for water supply storage in accordance with 
Water Supply Act of 1958. Utilization of storage has not 
been initiated. Reimbursement was initiated at the option 
of the State in September 1978. 
Operations during fiscal year. Visitation for FY 1987 
was 1,314,700 visitor days. Maintenance: Activities included 
replacement of relief wells and ordinary operation and 
maintenance. 
15. PICK-SLOAN MISSOURI BASIN 
PROGRAM (KANSAS CITY DIST.) 
Location. Flood control improvements included in this 
project are on and along the Missouri River and several of 
its principle tributaries, in states comprising the Missouri 
River Basin. 
Existing project. The Pick-Sloan Missouri Basin program 
for flood control and other purposes in Missouri River 
Basin provides for levees along Missouri River between 
Sioux City, Iowa, and the mouth, flood-protection works at 
certain municipalities, and reservoirs on main stem of 
Missouri River and on tributaries for control of flooding. 
(See Table 20-B for authorizing legislation and Table 20-I 
on Kansas City District projects included in Pick-Sloan 
Missouri Basin program.) See individual project reports. 
20-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
16. POMME DE TERRE LAKE 
POMME DE TERRE RIVER, MO 
Location. Dam is on main stem of Pomme de Terre River, 
about 44 miles above mouth of stream in Hickory County, 
Missouri. The lake extending upstream into Polk County, 
Missouri. Site is about 3 miles south of Hermitage, Missouri, 
and 20 miles north of Bolivar, Missouri. 
Existing project. An earth and rockfill dam about 4,630 
feet long constructed to about 155 feet above riverbed and 
a dike section on left abutment about 2,790 feet long, providing 
storage capacity of 650,000 acre-feet (407,000 for 
flood control and 243,000 for sedimentation and multipurpose). 
Initial cost of constructing the completed project 
was $14,946,784. Total Federal cost of project, including 
$329,140 area redevelopment and $2,089,529 supplemental 
recreational development (Code 710), is $17,365,453. 
Construction was initiated in January 1957, and the project 
was placed in useful operation in October 1961. 
Operations during fiscal year. Visitation for FY 1987 
was 1,428,900 visitor days. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
17. POMONA LAKE, ONE HUNDRED 
TEN MILE CREEK, KS 
Location. Dam is on One Hundred Ten Mile Creek, a 
tributary of Marais des Cygnes (Osage) River, 7 miles above 
mouth of stream in Osage County, Kansas, about 7 miles 
northwest of Pomona, Kansas, and 34 miles upstream from 
Ottawa, Kansas. 
Existing project. An earthfill dam 7,750 feet long constructed 
to an average height of about 85 feet above 
streambed, with gated-outlet workes and an ungated chutetype 
spillway near left abutment. Total reservoir storage 
capacity is 230,000 acre-feet (160,000 for flood control, 
14,000 for sediment reserve, and 56,000 of multipurpose 
storage for water quality control, and recreation). Initial 
cost of constructing the completed project was $13,272,108. 
Total Federal cost of project, including supplemental recreational 
development $731,130 (Code 710), is $14,003,238. 
Construction began in July 1959, and the project was placed 
in operation in October 1963. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Pomona has water supply reimbursement under 
Water Supply Act of 1958 totaling $71,018. 
Operations during fiscal year. Visitation for FY 1987 
was 677,300 visitor days. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
18. RATHBUN LAKE, CHARITON 
RIVER, IA 
Location. Damsite is on Chariton River about 7 miles 
north of Centerville and 1 mile north of town of Rathbun, 
Appanoose County, Iowa. 
Existing project. An earthfill dam 10,600 feet long constructed 
to an elevation about 86 feet above valley floor, with 
gated-outlet works and an uncontrolled service chute with 
paved sill spillway about a mile upstream from left abutment. 
Total reservoir storage capacity is 552,000 acre-feet 
(339,000 for flood control, 24,000 for sediment reserve and 
189,000 of multipurpose storage for navigation, water 
quality control, and recreation). Initial cost of constructing 
the project was $27,033,210. Total Federal cost of project, 
including $588,948 supplemental recreation development 
(Code 710), is $27,622,158. Construction of the project was 
initiated in September 1964 and completed in November 
1969. The operating plan for this project was revised to 
reduce flood control releases during critical times of the 
year to allow local farmers better access during planting 
and harvesting and to facilitate field drainage and drying 
out. The revised plan has resulted in more frequent high 
pool elevations than anticipated, which has inundated roads 
and recreation ficilities. A shoreline erosion study was 
accomplished and a supplement to the master plan was 
approved, which resulted in relocation of recreation facilities 
and bank stabilization work to compensate for the higher 
lake levels. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Visitation for FY 1987 
was 1,022,000 visitor days. Maintenance: Activities included 
completion of construction of Island View shower building, 
and ordinary operation and maintenance. 
19. SMITHVILLE LAKE, LITTLE 
PLATTE RIVER, MO 
Location. Damsite is on Little Platte River about 1 mile 
northeast of Smithville and about 5 miles north of Kansas 
City, in Clay and Clinton Counties, Missouri. 
Existing project. Earthfill dam about 4,200 feet long and 
95 feet high with an uncontrolled service spillway. A dike 
about 2,400 feet long crosses a saddle in left abutment. Total 
reservoir storage capacity is 246,500 acre-feet (92,000 for 
flood control, 52,300 for sediment reserve, and 102,200 of 
multipurpose storage for water supply, water quality control, 
and recreation). Estimated Federal cost (1986) through 
construction of the project is $87,835,000. Construction was 
initiated in November 1973, and the project was placed in 
operation in March 1982. 
Local cooperation. Section 2, Flood Control Act of 
June 28, 1938 applies. Reimbursement of $24,000,000 will 
be required for water supply storage in accordance with 
Water Supply Act of 1958 and reimbursement of $7,500,000 
will be required for recreation development in accordance 
with Federal Water Project Recreation Act of 1965. Additional 
non-Federal contribution for recreation amounts to 
$737,000. All contracts for local cooperation were approved 
by the Secretary of the Army on November 27, 1972. 
Operations during fiscal year. Visitation for FY 1987 
was 1,189,100 visitor days. Project is physically complete, 
but not financially complete. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
20. TUTTLE CREEK LAKE, BIG 
BLUE RIVER, KS 
Location. Dam is on main stem of Big Blue River, about 
20-6

KANSAS CITY, MO., DISTRICT 
12 miles above the mouth of stream in Riley and Pottawatomie 
Counties, Kansas. Site is about 12 miles northwest 
of Manhattan, Kansas. 
Existing project. An earth and rock dam 7,500 feet long 
and 157 feet high. Total reservoir storage capacity is 
2,346,000 acre-feet (1,933,000 for flood control, 228,000 for 
sediment reserve and 185,000 for multipurpose storage, for 
low-flow regulation, navigation, and recreation). Initial cost 
of constructing the completed project was $80,051,031. Total 
Federal cost of project, including $533,048 supplemental 
recreational development (Code 710), is $80,584,079. Construction 
began in October 1952. Project was placed in 
operation in July 1962. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Visitation for FY 1987 
was 993,500 visitor days. Maintenance: Activities included 
boundary rectification, emergency repair of downstream 
sinkholes, repair of upstream riprap, and ordinary operation 
and maintenance. 
21. WILSON LAKE, SALINE RIVER, KS 
Location. Dam is on Saline River about 130 miles above 
its mouth, near eastern edge of Russell County, Kansas, 
about 50 miles west of Salina, 10 miles north of Wilson, and 
20 miles east of Russell, Kansas. 
Existing project. An earthfill dam about 5,600 feet long 
and 160 feet high with a gated-outlet works, chute spillway, 
storage capacity is 776,000 acre-feet (511,000 for flood control, 
40,000 for sediment reserve and 225,000 multipurpose 
storage for irrigation, navigation, and low flow regulation). 
Initial cost of constructing the project was $20,015,023. 
Total Federal cost of project, including $448,344 supplemental 
recreational development (Code 710), is $20,463,367. 
Construction began in April 1961 and the project was placed 
in operation in December 1964. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations during fiscal year. Visitation for FY 1987 
was 511,300 visitor days. Maintenance: Activity consisted 
of ordinary operation and maintenance. 
22. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Under sections 7 and 9, 1944 Flood Control Act, the Corps 
is responsible for detailed scheduling of operations concerning 
storage capacity reserved for or assigned to flood control 
in reservoirs constructed by Bureau of Reclamation as 
well as those constructed by the Corps. 
23. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Flood Control Act of June 22, 1936, P.L. 738, and subsequent 
acts require local interests to furnish assurances 
that they will maintain and operate certain local protection 
projects after completion in accordance with regulations 
prescribed by the Secretary of the Army. District Engineers 
are responsible for administration of these regulations 
within boundaries of their respective district. (See Table 
20-J on inspection of completed flood control projects.) 
24. INSPECTION OF NON-FEDERAL 
LEVEES 
Non-Federal flood protection works constructed or 
rehabilitated under P.L. 84-99 must be inspected by the 
Corps of Engineers to assure compliance with local cooperation 
agreements. 
25. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency flood control activities-repair, flood fighting, 
and rescue work (Public Law 99, 84th Congress, and 
Antecedent Legislation). 
Operations for period October 1, 1986 thru September 30, 
1987 were as follows: 
Disaster Preparedness Program includes planning, 
training, inspection, supplies and equipment and personnel. 
Flood Fighting and Rescue Work for a flood event on 
the Missouri River and tributaries declared in September 
1986 and terminated in November 1986, and for two flood 
events on the Kansas River and tributaries. 
Rehabilitation of both non-Federal farm levees and 
Federal authorized levees and control works damaged. as 
a direct result of flooding. 
(See Table 20-L for costs.) 
Small Flood Control Projects Not Specifically 
Authorized by Congress (Sec. 205, 1948 Flood Control 
Act, Public Law 858, 80th Cong., June 30, 1948, as 
amended). 
Each project selected must be complete in itself, 
economically and environmentally justified, and limited to 
a Federal cost of not more than $5 million. The local sponsoring 
agency must agree to provide without cost to the 
Department of the Army, all lands, easements, and rightsof-
way, including highway, highway bridge, and utility relocations 
and alterations; hold and save the Department of the 
Army free from damages; maintain and operate the project 
after completion; assume all project costs in excess of 
the Federal cost limit; and prevent future encroachments 
on improved channels. 
The Water Resources Development Act of 1986 creates 
additional requirements for the non-Federal sponsors of 
Section 205 projects. The sponsor must pay 50 percent of 
the cost of the feasibility study. For structural flood control 
projects, the sponsor must pay in cash during the construction 
at least 5 percent of the construction cost. The 
sponsor's cash and other contributions must equal 25 percent 
of the total construction cost, but will not be required 
to exceed 50 percent. 
There were no Section 205 projects under construction 
in Fiscal Year 1987. 
See Table L for expenditures under Section 205 during 
Fiscal Year 1987. 
20-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Emergency Bank Protection (Section 14, 1946 Flood 
Control Act, Public Law 526, 79th Cong., July 24, 1946) 
as amended. 
Each project selected must be complete in itself, engineeringly 
feasible, economically justifiable, environmentally 
acceptable, and limited to a Federal cost of not more than 
$500,000. The local sponsoring agency must agree to provide 
without cost to the Department of the Army, all lands, 
easements, and rights-of-way, including highway, highway 
bridge, and utility relocations and alterations required for 
project construction; operate, maintain, repair, replace, and 
rehabilitate the project upon completion; hold and save the 
Department of the Army free from damages arising from 
the construction, operation, maintenance, repair, replacement, 
and rehabilitation of the completed project; and 
assume all project costs in excess of the Federal cost limit. 
The Water Resources Development Act of 1986 creates 
additional requirements for the non-Federal sponsor of Section 
14 projects. For structural streambank protection 
projects the local sponsor must provide, during the period 
of construction, a minimum cash contribution of 5 percent 
of total project cost. In addition, the sponsor's cash and 
other contributions must equal to not less than 25 percent 
of the total project cost, but will not be required to exceed 
50 percent. 
Projects that were physically complete in FY 86, but 
financially completed in FY 87 are as follows (for detailed 
project descriptions, see FY 86 Annual Report.): 
Osage River, Miller County, MO, Road HH 
Nodaway River, Andrew and Holt Counties, MO, 
Fillmore Bridge 
Kimsey Creek, Holt County, MO, Casteel Bridge 
Big Blue River, Saline County, NE, Thxedo Park 
Road and Bridge 
Yankee Creek, Johnson County, NE, West Tecumseh 
Bridge 
Yankee Creek, Johnson County, NE, Vesta Bridge 
Little Blue River, Adams County, NE, Overy Bridge. 
Projects that were physically and financially complete in 
FY 87 are as follows: 
Wakarusa River, Baldwin City, KS, City Waterline - 
Construction was completed in February 1987 on this 
project to protect the city waterline. The project consists 
of a sheet pile wall, stone drains, and riprap to provide erosion 
protection. 
Little Blue River, Marshall County, KS, FAS Road 
1108 - Construction was completed in November 1986 on 
this project to protect the county road from flood-caused 
erosion. The project consists of a stone fill revetment with 
baffle dikes. 
Nodaway River, Andrew County, MO, Road T - Construction 
was completed in February 1987 on a remedial 
measures and repair on this project which protects the county 
road and bridge. The project was originally completed 
in December 1985, and consisted of 2,450 feet of stone fill 
along the streambank. However, in March of 1986, the 
project was damaged by flooding. 
Beaver Creek, Webster County, NE, Bridge 43430 - 
Construction was completed in October 1986 on this project 
to protect the county road and bridge. The project consists 
of a concrete rubble fill. 
Elm Creek, Webster County, NE, Bridge 33425 - Construction 
was completed in October 1986 on this project to 
protect the county road and bridge. The project consists of 
a concrete rubble fill. 
Elm Creek, Webster County, NE, Bridge 23015 - Construction 
was completed in October 1986 on this project to 
protect the county road and bridge. The project consists of 
a concrete rubble fill. 
Beaver Creek, Webster County, NE, Bridge 23025 - 
Construction was completed in October 1986 on this project 
to protect the county road and bridge. The project consists 
of concrete rubble streambank paving on the left 
streambank and concrete rubble fill on the right streambank 
to protect the bridge abutments. 
Beaver Creek, Webster County, NE, Bridge 14710 - 
Construction was completed in October 1986 on this project 
to protect the county road and bridge. The project consists 
of concrete rubble streambank paving. 
Thrkey Creek, Fillmore County, NE, Bridge 123 - Construction 
was completed in October 1986 on this project to 
protect the county road and bridge. The project consists of 
a concrete rubble revetment with tieback dikes. 
Thrkey Creek, Fillmore County, NE, Bridge 385 - Construction 
was completed in November 1986 on this project 
to protect the county road and bridge. The project consists 
of a revetment with baffle dikes. 
Little Blue River, Adams County, NE, Pauline Bridge 
- Construction was completed in November 1986 on this 
project to protect the county road and bridge. The project 
consists of a concrete rubble fill and windrow revetment 
on the right streambank. 
Little Blue River, Adams County, NE, Pimpel Bridge 
- Construction was completed in November 1986 on this 
project to protect the county road and bridge. The project 
consists of 450 linear feet of concrete rubble revetment with 
baffle dikes. 
See Table L for Emergency Bank Protection expenditures 
during FY 1987. 
Multiple Pupose Projects 
Including Power 
26. HARRY S. TRUMAN DAM AND 
RESERVOIR, OSAGE RIVER, MO 
Location. Damsite is on main stem of Osage River about 
1.5 miles northwest of Warsaw, Benton County, Missouri. 
Reservoir extends into Bates, Henry, Hickory, St. Clair, and 
Vernon Counties, Missouri. 
Existing project. An earthfill dam about 5,000 feet long 
constructed to an average height of about 96 feet above 
streambed, including a gate-controlled overfall spillway section 
and a power installation consisting of six inclined pumpgenerating 
units with total capacity of 160,000 kilowatts. 
Total reservoir storage capacity is 5,202,000 acre-feet 
(3,918,000 for flood control, 244,000 for sediment reserve, 
and 1,040,000 multipurpose storage for power, low-flow 
regulation, and recreation). Public Law 91-267, approved 
May 26, 1970, authorized a change in project name from 
Kaysinger Bluff Dam and Reservoir, Osage River Basin, 
20-8

KANSAS CITY, MO., DISTRICT 
Missouri, to the Harry S. Truman Dam and Reservoir. 
Estimated cost (1987) is $550 million. Construction of 
relocation of Missouri Highway M-13 was initiated 
September 1964 and completed May 1966. Construction of 
the dam and reservoir was initiated in October 1964. The 
embankment has been completed including paving the top 
of the dam roadway. The spillway was completed in October 
1979. The Southwestern Power Administration powerline 
needed for final testing and commercial operation of the 
generators was completed in December 1979. The first 
power unit was placed on line on December 22, 1979. Subsequent 
problems with the turbine bearing required remedial 
design on the bearing. Restricted commercial power production 
began in April 1982. Through September 1987, 
power generation totaled 2,229,907,800 kilowatt hours. Of 
the gross income from the sale of power by Southwestern 
Power Administration, $27,894,562 was allocated to the 
Corps of Engineers for project power operating costs, 
interest, investment recovery. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operation during fiscal year. Visitation for FY 1987 was 
2,172,000 visitor days. Work was continued on acquisition 
of land and rights-of-way; relocation of roads, utilities and 
municipal facilities; construction of the powerplant; and construction 
of public use facilities. Project is 96 percent complete. 
During FY 1987, 460,186,000 kilowatt-hours of electrical 
power were generated. Maintenance: Activities consisted 
of initiation of contract for repair of turbine blade, 
initiation of contract for painting gates, repair of flooddamaged 
recreation facilities, and ordinary operation and 
maintenance. 
27. STOCKTON LAKE, SAC RIVER, MO 
Location. Damsite is on Sac River about 49.5 miles above 
its confluence with Osage River, and about 2 miles east of 
Stockton, Cedar County, Missouri, lake extending into Dade 
and Polk Counties. 
Existing project. A rock-shell dam with impervious core 
about 5,100 feet long constructed to an average height of 
about 128 feet, with a gated overfall spillway and a 
45,200-kilowatt power installation. Total reservoir storage 
capacity is 1,674,000 acre-feet (774,000 for flood control, 
25,000 for sediment reserve and 875,000 multipurpose 
storage for power and recreation). Initial cost of constructing 
the completed project was $75,721,000. Estimated cost 
of the project, including $3,785,000 for downstream channel 
work and $502,057 for supplemental recreational 
development (Code 710), is $80,008,057 (1986). Construction 
was initiated in October 1963, and the project was 
placed in operation in December 1969. Power operation 
problems were encountered with the initial operation in 
March 1973 because the downstream channel did not have 
the capacity which earlier observations and computations 
indicated. As a result, it has been necessary to restrict the 
power operation to about the 30,000 kilowatt level. Rightof-
way for construction of a channel cutoff and bridge at 
Horseshoe Bend has been acquired, and construction has 
been completed. Remaining work consisting of completing 
acquisition of the sloughing easements downstream to Caplinger 
Mills is underway. Completion will assure 
downstream channel capacity to Caplinger Mills of 8,000 
cf.s. for powerplant operation. Discharge in this range will 
accommodate power operations at a 39,500-kilowatt level. 
Through September 1987, power generation totaled 
853,597,800 kilowatt-hours. Of the gross income from the 
sale of power by Southwestern Power Administration, 
$16,696,505 was allocated to the Corps of Engineers for 
project operating costs, interest, investment recovery. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations during fiscal year. Visitation for FY 1987 
was 1,966,900 visitor days. The project is complete and in 
operational status. Acquisition of sloughing easements 
downstream to Caplinger Mills was continued. The net 
amount of power marketed with Southwestern Power 
Administration was 63,353,000 kilowatt-hours. Maintenance: 
Activities consisted of boundary monumentation and 
ordinary operation and maintenance. 
General Investigations 
28. GENERAL INVESTIGATIONS 
Fiscal year 1987 costs totaled $1,629,407 for all General 
Investigation activities. See Table 20-K which covers 
Surveys, Collection and Study of Basic Data, and Continuation 
of Planning and Engineering. 
20-9

REPORT OF THE SECRETARV OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 20-A COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project 
1. Missouri River, 
Sioux City, IA 
to Mouth (Rulo, 
Nebr., to Mouth) 
(Federal Funds) 
(Contributed 
Funds) 
(Consolidated 
Summary) 
2. Blue River Channel 
Kansas City, 
MO 
Blue River Channel 
(Contributed 
Funds) 
(Consolidated 
Funds) 
3. Brush Creek, 
Kansas City, 
MO 
4. Clinton Lake, 
Wakarusa 
River, KS 
(Contributed 
Funds) 
(Consolidated 
Summary) 
5. Harlan County 
Lake, Republican 
River, NE 
6. Hillsdale Lake, 
Big Bull 
Creek, KS 
Funding 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Total Cost to 
FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
5,045,700 6,757,700 
5,044,483 6,827,686 
5,045,700 
5,044,483 
-2,225,000 
1,255,250 
6,757,700 
6,827,686 
2,028,000 
6,563,575 
10U,U000 - 
- 27,162 
-2,155,000 2,028,000 
1,255,250 6,590,737 
-106,100 
148,626 
1,310,500 
1,315,435 
-8,000 
0 
1,077,100 
1,114,088 
39,600 
203,412 
669,100 
669,879 
1,104,500 
1,104,848 
1,246,400 
1,247,941 
14,766 
585,600 
585,618 
- - 237,942,1901 
- - 237,942,1901 
6,452,000 5,312,600 275,258,8142 
6,489,931 5,312,600 275,258,8142 
- - 816,190 
- - 816,190 
- - 22,642 
- - 22,642 
- - 238,758,3801 
- - 238,758,3801 
6,452,000 5,312,600 275,281,4562 
6,489,931 5,312,600 275,281,4562 
6,052,000 5,750,000 23,550,171 
6,123,287 3,029,536 20,824,521 
- -34,704 35,296 
7,073 1,061 35,296 
6,052,000 5,715,296 23,585,467 
6,130,360 3,030,597 20,859,817 
325,000 488,000 813,000 
301,712 510,235 811,497 
- - 57,415,433 
- - 57,415,433 
1,237,000 1,193,100 8,676,400 
1,237,034 1,188,950 8,672,250 
- - 118,805 
- - 118,805 
- - 57,534,238 
- - 57,534,238 
- - 47,111,926 
- - 47,111,9263 
1,249,000 1,024,500 18,235,961 
1,230,196 1,039,936 18,232,517 
- - 1,017,623 
- - 1,017,623 
140,000 - 64,161,400 
140,000 - 64,161,400 
611,000 589,300 3,249,800 
611,096 587,500 3,248,000 
20-10

KANSAS CITY, MO., DISTRICT 
TABLE 20-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
7. Kanopolis Lake, 
Smoky Hill 
River, KS 
8. Little Blue River 
Channel Improvement, 
Little Blue 
River, MO 
9. Little Blue River 
Lakes, Little Blue 
River, MO 
(Contributed 
Funds) 
(Consolidated 
Summary) 
10. Long Branch Lake 
Little Chariton 
River, MO 
(Contributed 
Funds) 
(Consolidated 
Summary) 
11. Melvern Lake 
Osage (Marais des 
Cygnes) River, KS 
12. Milford Lake, 
Republican River, 
KS 
13. Missouri River 
Levee System 
IA, NE, KS 
and MO 
14. Perry Lake, 
Delaware River, KS 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
1,069,800 
1,075,270 
3,258,000 
3,287,641 
1,452,400 
1,427,289 
667,000 
562,410 
1,696,000 
1,723,084 
55,000 
128,044 
-- 12,577,227 
- 12,577,2274 
1,663,400 15,641,410 
1,658,450 15,636,460 
- 25,505,083 
52,007 25,495,256 
13,085,000 12,600,000 6,371,000 4,152,000 
15,720,359 11,917,433 7,060,777 4,165,726 
- - - 271,600 
- - - 271,600 
- - - 29,953 
264,070 96,113 30,721 6,738 
13,085,000 12,600,000 6,371,000 4,181,953 
15,984,429 12,013,546 7,091,498 4,172,464 
-29,400 150,000 - 480,000 
80,574 121,143 48,721 374,529 
413,000 567,800 503,000 685,100 
415,036 567,851 503,029 680,100 
108,750 - 484,612 -5,803 
-20,074 98,799 59,520 224,016 
79,350 150,000 484,612 474,197 
60,500 219,942 108,241 598,545 
1,361,900 
1,364,012 
15,805 
1,399,800 
1,405,505 
196,000 
209,080 
1,874,900 
1,888,451 
1,532,000 
1,533,795 
1,396,400 
1,397,076 
512,000 
516,711 
2,419,500 
2,376,085 
1,046,000 
1,046,062 
1,273,000 
1,273,091 
583,000 
583,031 
1,213,200 
1,213,200 
1,557,400 
1,555,900 
2,129,000 
742,202 
135,011,200 
134,971,419 
271,600 
271,600 
1,217,453 
1,023,763 
136,228,653 
135,995,182 
18,286,177 
18,179,273 
3,638,600 
3,633,600 
1,119,3315 
857,6076 
19,405,5087 
19,036,8806 
37,436,530 
37,436,530 
12,569,960 
12,569,960 
49,566,492 
49,566,492 
17,098,924 
17,096,424 
59,014,851 
57,627,450 
- - 49,095,918 
- - 49,095,918 
1,533,000 1,503,200 19,146,684 
1,576,795 1,502,000 19,145,484 
20-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 20-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section 
in Text 
16. 
Project 
Pomme de Terre 
Lake, Pomme de 
Terre River, MO 
17. Pomona Lake, One 
Hundred Ten Mile 
Creek, KS 
18. Rathbun Lake, 
Chariton River, 
IA 
19. Smithville Lake, 
Little Platte 
River, MO 
20. Tuttle Creek Lake 
Blg Blue 
River, KS 
21. Wilson Lake, 
Saline River, 
KS 
22. Scheduling Flood 
Control Reservoir 
Operations 
23. Inspection of 
Completed Flood 
Control Projects 
24. Inspection of 
Non-Federal 
Levees 
26. Harry S. Truman 
Dam & Reservoir 
Osage River, MO 
27. Stockton Lake, 
Sac River, MO 
FY 84 FY 85 FY 86 FY 87 
Total Cost to 
Funding Sept. 30, 1987 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost- 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
1. Includes $8,665,594 costs of new work for previous 
project. 
2. Includes $738,109 for maintenance of previous project. 
3. Excludes cost of materials furnished without charge 
in the amount of $24,198. 
4. Excludes cost of materials furnished without charge 
in the amount of $7,885. 
5. Correct total is $1,095,596, which includes $43,074 interest 
during construction. Correction pending. 
6. Unable to verify. 
7. Correct amount is $19,381,773. 
20-12 
15,000 
15,000 
1,578,400 
1,589,591 
1,818,200 
1,830,355 
-15,000 
336,702 
1,898,500 
2,203,430 
1,193,000 
924,469 
1,080,500 
1,081,351 
1,539,900 
1,546,437 
995,300 
1,012,121 
161,700 
162,014 
338,100 
338,301 
95,000 
94,997 
12,425,000 
16,710,978 
4,039,900 
4,061,256 
-269,000 
855,969 
2,690,900 
2,699,062 
- - - 17,365,452 
- - - 17,365,452 
1,429,500 1,453,000 1,277,400 17,865,912 
1,428,495 1,454,098 1,277,400 17,865,912 
- - - 14,003,238 
- - - 14,003,238 
1,038,200 1,058,000 1,165,900 15,142,233 
1,039,549 1,058,022 1,163,088 15,139,421 
- - - 27,622,159 
- - - 27,622,159 
2,541,300 1,609,500 1,321,300 17,759,018 
2,503,486 1,627,595 1,331,082 17,749,018 
- -33,000 67,000 87,685,315 
774,661 370,426 35,558 87,648,178 
879,000 987,000 801,100 5,898,100 
875,127 990,924 801,050 5,898,050 
- - - 80,584,079 
- - - 80,584,079 
1,476,700 1,375,000 2,036,400 17,775,179 
1,477,840 1,376,718 2,022,437 17,761,216 
- - - 20,463,367 
- - - 20,463,367 
1,109,900 1,458,000 1,671,900 13,496,946 
1,110,138 1,239,997 1,889,950 13,496,946 
173,000 195,160 164,000 54,178,483 
174,032 195,160 164,000 54,178,483 
365,000 350,340 287,400 4,280,815 
364,917 350,490 287,400 4,280,815 
153,000 138,000 39,000 498,000 
152,458 138,546 39,000 498,000 
9,200,000 3,093,000 3,507,000 528,089,900 
8,860,644 3,563,417 3,412,650 527,950,852 
4,859,300 5,136,000 6,444,100 32,297,300 
4,870,785 5,133,990 6,438,198 32,288,288 
105,000 73,000 201,000 79,932,357 
132,582 451,361 220,675 79,920,914 
1,876,800 1,830,000 2,217,200 23,385,500 
1,868,147 1,839,804 2,220,270 23,385,440

KANSAS CITY, MO., DISTRICT 
TABLE 20-B AUTHORIZING LEGISLATION 
See Section Date of 
in Text Act Project and Work Authorized Documents 
Jul. 25, 1912 
Aug. 8, 1917 
Mar. 3, 1925 
Jan. 12, 1927 
Jul. 3, 1930 
Aug. 30, 1935 
Mar. 2, 1945 
Dec. 31, 1970 
Nov. 17, 1986 
Oct. 23, 1962 
Jun. 28, 1938 
Aug. 18, 1941 
Dec. 22, 1944 
Sep. 3, 1954 
Jun. 28, 1938 
MISSOURI RIVER, SIOUX CITY, IA, TO 
MOUTH (RULO, NE, TO MOUTH) 
Project adopted for securing a permanent navigable 
channel of 6-foot depth from Kansas City, MO to 
mouth. 
Fixed upstream limit of improvement at upper end of 
Quindaro Bend (374.8 miles from mouth) and provided 
for dredging. 
For a mimimum width of 200 feet and depth of 6 feet, 
with a reasonable additional width around bends, 
mouth to upper end of Quindaro Bend, Kansas City, 
MO. 
Appropriation of $12 million authorized for securing a 
6-foot channel depth between Kansas City, MO, 
Quindaro bend, and Sioux City, IA. 
Appropriation of $15 million additional authorized; 
additional allotments totaling $29,153,108 were made 
by Public Works Administration under provisions of 
National Industrial Recovery Act of 1933, and 
$9,669,791 allotted under provisions of Emergency 
Relief Appropriation Act of 1935. 
Completion of improvement from mouth to Sioux City, 
IA. 
Securing a navigable channel of 9-foot depth and a 
minimum width of 300 feet. 
BLUE RIVER CHANNEL, KANSAS CITY, MO 
Adopted plan for Blue River Basin and authorized 
$40,000,000 for initiation and partial accomplishment. 
BRUSH CREEK, KANSAS CITY, MO 
Project for flood control on Brush Creek, a tributary of 
the Blue River, Kansas City, MO, authorized at 
estimated total cost of $16,100,000. 
CLINTON LAKE, WAKARUSA RIVER, KS 
The project for the Kansas River, KS, NE, and CO is 
authorized at an estimated cost of $88,070,000. 
HARLAN COUNTY LAKE, REPUBLICAN 
RIVER, NE 
Adopted general comprehensive plan for Missouri 
River Basin and authorized $9 million for initiation 
and partial accomplishment. 
Modified general comprehensive plan to include Harlan 
County Dam and Reservoir on Republican River, 
NE, other supplemental flood control works on 
upper Republican River, and authorized $7 million 
additional expenditure. 
Expanded general comprehensive plan for Missouri 
River Basin and authorized $200 million additional 
expenditure. 
HILLSDALE LAKE, BIG BULL CREEK, KS 
The comprehensive plan for the Missouri River Basin, 
approved by the Act of June 28, 1938, and as 
amended and supplemented is further modified to 
include the project for flood protection on the 
Kansas River and tributaries. It is further modified 
to include the project for flood protection on the 
Osage River and tributaries. 
KANOPOLIS LAKE, SMOKY HILL RIVER, KS 
Adopted general comprehensive plan for Missouri 
River Basin and authorized $9 million for initiation 
and partial accomplishment. 
H. Doc. 1287, 61st Cong., 
(contains latest published 
map). EP.L. 241-62. 
H. Doc. 463, 64th Cong., 
(contains latest published 
map). 
EP.L. 585-68. 
H. Doc. 1120, 60th Cong., 
EP.L. 560-70. 
EP.L. 67-73 
H.R.11781 
EP.L. 520-71 
H. Doc. 238, 73d Cong., 
(contains latest published 
map). EP.L. 409-73 
H. Doc. 214, 76th Cong., 
(contains latest published 
map). EP.L. 14-79. 
H. Doc. 91-332, 91st Cong. 
Sec. 401, Water Resources 
Development Act of 1986, 
EP.L. 99-662 
1962 Flood Control Act 
S. Doc 122, H. Doc. 578, 
87th Cong., EP.L. 87-874. 
Flood Control Committee 
Doc. 1, 75th Cong., 
EP.L. 761. 
H. Doc. 842, 76th Cong.; 
EP.L. 77-228. 
H. Doc. 475 and S. Docs. 
191 and 247, 78th Cong., 
EP.L. 534. 
EP.L. 780, 83rd Cong., H. Doc. 
549, 81st Cong. 
Flood Control Committee 
Doc. 1, 75th Cong., 
EL. 761. 
20-13 
3. 
4. 
5.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 20-B (Continued) AUTHORIZING LEGISLATION 
See Section Date of 
in Text Act Project and Work Authorized Documents 
Aug. 18, 1941 
Dec. 22, 1944 
Aug. 13, 1968 
Aug. 13, 1968 
Oct. 27, 1965 
Sep. 3, 1954 
Sep. 3, 1954 
Aug. 18, 1941 
Dec. 22, 1944 
Sep. 3, 1954 
Jun. 28, 1938 
Aug. 18, 1941 
Dec. 22, 1944 
Jul. 24, 1946 
May 17, 1950 
Modified general comprehensive plan to include Harlan 
County Dam and Reservoir on Republican River, 
NE, other supplemental flood control works on 
upper Republican River, and authorized $7 million 
additional expenditure. 
Expanded general comprehensive plan for Missouri 
River Basin and authorized $200 million additional 
expenditure. 
LITTLE BLUE RIVER CHANNEL 
Additional $38,000,000 for prosecution of general comprehensive 
plan for Missouri River Basin. 
LITTLE BLUE RIVER LAKES, MO 
Additional $38,000,000 for prosecution of general comprehensive 
plan for Missouri River Basin. 
LONG BRANCH LAKE, LITTLE CHARITON 
RIVER, MO 
The project for flood protection on the Chariton and 
Little Chariton Rivers and tributaries, IA and MO, 
is authorized at an estimated cost of $9,167,000. 
MELVERN LAKE, MARAIS DES CYGNES 
(OSAGE) RIVER, KS 
Expanded general comprehensive plan for Missouri 
River Basin and authorized $217,710,000 additional 
expenditure. 
MILFORD LAKE, REPUBLICAN RIVER, KS 
Expanded general comprehensive plan for Missouri 
River Basin and authorized $217,710,000 additional 
expenditure. 
MISSOURI RIVER LEVEE SYSTEM, IA, NE, KS, 
AND MO 
Levees along both sides of river from Sioux City to 
Kansas City. 
Extended project from Kansas City to the mouth and 
provided for increased protection. 
PERRY LAKE, DELAWARE RIVER, KS 
Expanded general comprehensive plan for Missouri 
River Basin and authorized $217,710,000 additional 
expenditure. 
PICK-SLOAN MISSOURI BASIN PROGRAM 
(KANSAS CITY DIST) 
Adopted general comprehensive plan for Missouri 
River Basin and authorized $9 million for initiation 
and partial accomplishment. 
Modified general comprehensive plan to include Harlan 
County Dam and Reservoir on Republican River, 
NE, other supplemental flood control works on 
upper Republican River, and authorized $7 million 
additional expenditure. 
Expanded general comprehensive plan for Missouri 
River Basin and authorized $200 million additional 
expenditure 
Additional expenditure of $150 million for prosecution 
of general comprehensive plan for Missouri River 
Basin. 
Additional expenditure of $250 million for prosecution 
of general comprehensive plan for Missouri River 
Basin. 
H. Doc. 842, 76th Cong.; 
P.L. 77-228. 
H. Doc. 475 and S. Docs. 
191 and 247, 78th Cong., 
P.L. 534. 
P.L. 90-483 (H. Doc. 169, 
90th Cong. 
P.L. 90-483 (H. Doc. 169, 
90th Cong. 
1965 Flood Control Act, P.L. 
89-298, (H. Doc. 238, 89th 
Cong. 
H. Docs. 642, 5491, and 561, 
83rd Cong., P.L. 780 
H. Doc. 549 ; 83rd Cong., 
P.L. 780 
H. Doc. 821, 76th Cong. 
H. Doc. 475 and S. Docs. 
191 and 247, 78th Cong. 
H. Docs. 642, 5491, and 561, 
83rd Cong., PL. 780. 
Flood Control Committee 
Doc. 1, 75th Cong. 
H. Doc. 842, 76th Cong.; 
P.L. 77-228 
H. Doc. 475 and S. Docs. 
191 and 247, 78th Cong. 
20-14 
8. 
10. 
11. 
12. 
13. 
14. 
15.

KANSAS CITY, MO., DISTRICT 
TABLE 20-B (Continued) AUTHORIZING LEGISLATION 
Date of 
Act Project and Work Authorized 
Sep. 3, 1954 
May 2, 1956 
Jul. 3, 1958 
Jul. 14, 1960 
Dec. 30, 1963 
Jun. 18, 1965 
May 12, 1967 
Aug. 13, 1968 
Dec. 24, 1970 
Dec. 23, 1971 
Mar. 7, 1974 
Jun. 28, 1938 
Dec. 22, 1944 
Sep. 3, 1954 
Sep. 3, 1954 
Sep. 3, 1954 
Oct. 27, 1965 
Expanded general comprehensive plan for Missouri 
River Basin and authorized $217,710,000 additional 
expenditure. 
Modified general comprehensive plan for Missouri 
River Basin by deletion of construction of Red 
Willow Dam and Reservoir, NE, and addition of construction 
of Wilson Dam and Reservoir, KS. 
Expanded general comprehensive plan for Missouri 
River Basin and authorized $200 million additional 
expenditure. 
Additional expenditure of $207 million for prosecution 
of general comprehensive plan for Missouri River 
Basin. 
Additional expenditure of $80 million for prosecution 
of general comprehensive plan for Missouri River 
Basin and modified plan to include bank protection 
or rectification works below Garrison Dam. 
Additional $116 million for prosecution on general 
comprehensive plan for Missouri River Basin. 
Additional $20 million for prosecution of general 
comprehensive plan for Missouri River Basin. 
Additional $38,000,000 for prosecution of general comprehensive 
plan for Missouri River Basin. 
Change comprehensive plan name to Pick-Sloan 
Missouri River Basin program. 
Additional $101,000,000 for prosecution of general 
comprehensive plan for Pick-Sloan Missouri Basin 
Program. 
Additional $72,000,000 for prosecution of general comprehensive 
plan for Pick-Sloan Missouri Basin Program. 
POMME DE TERRE LAKE, POMME DE TERRE 
RIVER, MO 
Adopted general comprehensive plan for Missouri 
River Basin and authorized $9 million for initiation 
and partial accomplishment. 
Expanded general comprehensive plan for Missouri 
River Basin and authorized $200 million additional 
expenditure. 
Expanded general comprehensive plan for Missouri 
River Basin and authorized $217,000,000 additional 
expenditure. 
POMONA LAKE, ONE HUNDRED TEN MILE 
CREEK, KS 
Expanded general comprehensive plan for Missouri 
River Basin and authorized $217,710,000 additional 
expenditure. 
RATHBUN LAKE, CHARITON RIVER, IA 
Expanded general comprehenssive plan for Missouri 
River Basin and authorized $217,710,000 additional 
expenditure. 
SMITHVILLE LAKE, LITTLE PLATTE 
RIVER, MO 
The project for flood protection on the Platte River 
and tributaries, MO and IA, is authorized at an 
estimated cost of $26,889,000. 
H. Docs. 642 and 5491 83rd 
Cong. 
H. Doc. 409, 84th Cong. 
S. Doc. 91-1100, 91st Cong. 
S. Doc. 92-222, 92nd Cong. 
Flood Control Committee 
Doc. 1, 75th Cong., 
P.L. 761. 
H. Doc. 475 and S. Docs. 
191 and 247, 78th Cong., 
P.L. 534. 
H. Does. 642, 5491, and 561, 
83rd Cong., P.L. 780. 
H. Doc. 5491, 561, 83rd 
Cong., P.L. 780. 
H. Doc. 561, 83rd Cong., 
P.L. 780. 
1965 Flood Control Act, 
P.L. 89-298 (H. Doc. 262, 
89th Cong.) 
20-15 
See Section 
in Text 
16. 
17. 
18. 
19. 
Documents

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 20-B (Continued) AUTHORIZING LEGISLATION 
See Section Date of 
in 'Text Act Project and Work Authorized Documents 
TUTTLE CREEK LAKE, BIG BLUE RIVER, KS 
20. Jun. 28, 1938 Adopted general comprehensive plan for Missouri Flood Control Committee 
River Basin and authorized $9 million for initiatiion Doc. 1, 75th Cong., 
and partial accomplishment. P.L. 761. 
Aug. 18, 1941 Modified general comprehensive plan to include Harlan H. Doc. 842, 76th Cong.; 
County Dam and Reservoir on Republican River, P.L. 77-228. 
NE, other supplemental flood control works on 
upper Republican River, and authorized $7 million 
additional expenditure. 
Dec. 22, 1944 Expanded general comprehensive plan for Missouri H. Doc. 475 and S. Does. 
River Basin and authorized $200 million additional 191 & 247, 78th Cong., 
expenditure. P.L. 534. 
WILSON LAKE, SALINE RIVER, KS 
21. Dec. 22, 1944 Expanded general comprehensive plan for Missouri H. Doc. 475 and S. Does. 
River Basin and authorized $200 million additional 191 & 247, 78th Cong., 
expenditure. P.L. 534. 
Jul. 14, 19602 Additional expenditure of $207 million for prosecution S. Doc. 96, 86th Cong., 
of general comprehensive plan for Missouri River P.L. 645. 
Basin. 
HARRY S. TRUMAN DAM AND RESERVOIR, 
OSAGE RIVER, MO 
26. Sep. 3, 1954 Expanded general comprehensive plan for Missouri H. Doc. 549; 83rd Cong., 
River Basin and authorized $217,710,000 additional P.L. 780. 
expenditure. 
Oct. 23, 1962 The Kaysinger Bluff Reservoir is hereby modified in 1962 Flood Control Act, 
accordance with recommendations of the Chief of H. Doc. 578, 87th Cong., 
Engineers in H. Doc. 578, 87th Cong., at an P.L. 87-874. 
estimated additional cost of $43,245,000; provided, 
that nothing in this Act shall be construed as 
authorizing the acquisition of additional lands for 
the establishment of a national wildlife refuge at the 
reservoir. 
STOCKTON LAKE, SAC RIVER, MO 
27. Sep. 3, 1954 Expanded general comprehensive plan for Missouri H. Doc. 549 , 83rd Cong., 
River Basin and authorized $217,710,000 additional P.L. 780. 
expenditure. 
1. Contains latest published maps of Missouri River. 2. Report of Chief of Engineers on justification of Wilson Dam 
and Reservoir, submitted in compliance with Public Law 505, 
84th Congress, published as Senate Document 96, 86th Congress, 
was approved July 14, 1960 (Public Law 645). 
TABLE 20-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Fort Leavenworth Bridge removal Complete 1965 270,393 - 
Gasconade River, MO 1, 2 Complete 1931 139,003 85,077 
Osage River, MO, lock and dam3 Complete 1952 658,076 850,495 
1. Improvement adequate for existing needs. Project for 
maintenance only. 
2. Curtailment of project in H. Doc. 467, 69th Cong. 
3. Operation of lock and dam placed in standby status. 
20-16

TABLE 20-E 
KANSAS CITY, MO., DISTRICT 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Abilene, KS 
Atchison, KS 
Barnard, KS 1 
Bartley, NE 
Bedford, East Fork, 102 River, IA' 
Big Blue River, Seward, NE 1 
Big Stranger Creek, KS1 
Blue River Basin, Vicinity of Kansas City 4 
Braymer Lake, Shoal Creek, MO 
Brookfield Lake, Yellow Creek, MO 
Chariton-Little Chariton Basin, MO (1965 Act)2 
Chariton River, MO (1944 Act) 
Dry Fork and East Fork Lakes, 
Fishing River, MO 
East Muddy Creek, MO 
Elk Creek, Clyde, KS' 
Fairbury, Little Blue River, NE 
Fort Scott Lake, Marmaton River, KS 
Frankfort, Black Vermillion River, KS 
Gypsum, Gypsum Creek, KS' 
Harry S. Truman Dam and Reservoir, MO 
(Downstream Fish and Wildlife Mitigation) 
Indianola, NE 
Kansas City, Kansas River, KS (62 Mod) 
Kansas Citys on MO and KS Rivers, 
MO and KS3 
Lawrence, Kansas River, KS5 
Lower Grand River, MO 
Manhattan, Kansas River, KS 
Mercer Lake, Weldon River, MO 
Missouri River at New Haven, MO' 
Missouri River Fish and Wildlife Mitigation 
Osawatomie, Pottawatomie Creek, KS 
Ottawa, Osage (Marais des Cygnes) River, KS 
Pattonsburg Lake, Grand River, MO 
Pattonsburg Lake, Grand River, MO 
(Advance Highway Relocation) 
Pattonsburg Lake, Grand River, MO 
(Advance Town Relocation) 
Perry Lake Area (Road Improvements), KS 
Platte River, MO, Channel Improvement 
Rathbun Lake Fish Hatchery 
Salina, Smoky Hill River, KS 
Seward, NE 1 
Smithville Channel, Little Platte River, MO 
Smithville Lake, Trimble Wildlife Area 
Stonehouse Creek, Jefferson Co., KS' 
Topeka, Kansas River, KS 
Trenton Lake, Thompson River, MO 
Upper Grand River, MO 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Inactive 
Inactive 
Completed 
Deferred 
Inactive 
Completed 
Completed 
Active 
Completed 
Completed 
Inactive 
Completed 
Completed 
Completed 
Active 
Completed 
Inactive 
Completed 
Active 
Completed 
Completed 
Inactive 
Inactive 
Inactive 
Completed 
Deferred 
Completed 
Completed 
Completed 
Deferred 
Active 
Completed 
Completed 
Inactive 
Inactive 
1965 
1973 
1953 
1974 
1984 
1966 
1976 
1977 
1973 
1974 
1966 
1984 
1973 
1976 
1966 
1984 
1950 
1984 
1980 
1985 
1966 
1967 
1976 
1973 
1966 
1976 
1976 
1976 
1982 
1973 
1975 
1967 
1973 
1972 
1974 
1966 
1966 
1,099,350 
4,099,590 
127,860 
118,269 
652,414 
126,887 
337,131 
451,400 
692,706 
8,052,990 
51,989 
989,015 
726,966 
757,500 
1,271,025 
2,782,793 
67,275 
25,010,500 
42,434,197 
8,773,488 
2,488,585 
432,245 
139,883 
2,036,624 
4,462,661 
390,763 
91,929 
5,315,168 
222,193 
700,000 
3,878,668 
126,887 
6,896 
246,995 
21,174,593 
1. Authorized by the Chief of Engineers under Section 205, 
Public Law 858, 80th Congress, as amended. 
2. Little Chariton River (East and Middle Fork) and 
Mussell Fork classified inactive. Construction cost includes 
$481,106 cost of completed Shoal Creek Unit and $211,600 cost 
for inactive units, Little Chariton River and Mussell Fork. 
3. Includes $619,787 non-Federal contributions for work 
desired by local interests, but not required under the project. 
The project as a whole is complete except for Turkey Creek 
facilities in Central Industrial District Unit. 
4. Three lakes inactive and one lake deferred. 
5. Includes $153,377 non-Federal contributions. 
20-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 20-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Funds Funds 
Project Report For Date and Authority Expended Expended 
Arlington Lake, MO 
Beatrice, Big Blue River, NE 
Garnett Lake, Pottawatomie 
Creek, KS 
Grove Lake, Soldier Creek, KS 
Hackleman Corners Lake, 
Cedar Creek, MO 
Hays, Big Creek, KS1 
Indian Lake, Blue River, KS 
Kansas River Navigation 
Marysville, KS 
Merriam, Turkey Creek, KS 
Mill Lake, Blue River, MO 
Missouri River Levee System, 
KS, Units R 402; R 393-395; 
and R 414 
1948 Flood Control Act approved 
June 28, 1938, as modified by 
Flood Control Act approved 
August 18, 1941, and expanded 
by Flood Control Act approved 
December 22, 1944 
1965 Flood Control Act approved 
September 3, 1954 
1973 Flood Control Act approved 
September 3, 1954 
1977 1962 Flood Control Act (S. Doc. 
122, 87th Cong. 2d sess.) 
- Authorized by Flood Control Act 
approved September 3, 1954 
1974 Flood Control Act of 1965 approved 
October 27, 1965 
1976 1965 Flood Control Act (H. Doc. 
238, 89th Cong., 1st sess.) 
1980 1965 Flood Control Act, 
P.L. 89-298, Sec. 201 
- Flood Control Act of September 3, 
1954 
1970 Flood Control Act approved 
September 3, 1954 
1971 1970 Flood Control Act (H. Doc. 
332, 91st Cong., 2d sess.) 
- Flood Control Act of August 18, 
1941, P.L. 228, 77th Cong. 
$8,651 - 
16,317 
71,466 
1,754,019 
499,200 
127,297 
259,900 
133,682 
39,708 
57,500 
Onaga Lake, Vermillion Creek, 1982 Flood Control Act of 1962, 2,178,261 - 
KS October 23, 1962 (P.L. 87-874) 
Pioneer Lake, KS 1952 Flood Control Act approved 95,692 - 
June 28, 1938, as modified by 
Flood Control Act of August 18, 
1941, and expanded by Flood 
Control Act approved 
December 22, 1944 
Pomme de Terre Lake, MO 1954 Flood Control Act approved - - 
Hydroelectric Power September 3, 1954 (H.D. 549-81; 
Modification P.L. 83-780) 
Richland Lake, MO 1948 Flood Control Act approved 8,548 - 
June 28, 1938, as modified by 
Flood Control Act approved 
August 18, 1941, and expanded 
by Flood Control Act approved 
December 2, 1944 
Tomahawk Lake, Blue River, KS 1976 1970 Flood Control Act (H. Doc. 77,189- 
332, 91st Cong., 2d sess.) 
Tuttle Creek Lake, KS (Road 1977 Sec. 18 of Water Resources 3,000- 
Improvement - 1974 Mod.) Development Act of 1974 
Wolf-Coffee Lake, Blue River, 1976 1970 Flood Control Act (H. Doc. 1,095,020- 
KS 332, 91st Cong., 2d sess.) 
1. Water supply and flood problems at Hays, KS, are 
being studied under Section 205, Public Law 858, 80th 
Congress, as amended. 
20-18

TABLE 20-H 
KANSAS CITY, MO., DISTRICT 
MISSOURI RIVER LEVEE SYSTEM 
(See Section 13 of Text) 
Miles of 
Unit Levee Status 
R 512-513 Richardson Co. D. D. #7 
R 500 Iowa Point D. D. #4 
Kimsey Holly Creek 
L 497 Forest City L. D. 
L488 Holt Co. D. D. #7 
R 482 Burr Oak D. D. #3 
L 476 Amazonia L. D. 
R 460-471 Elwood-Gladden L. D. 
L 455 S. St. Joseph L. D. 
L 443-448 Halls L. D. 
R 440 Atchison & Doniphan Co. D. D. 
L 408 Farley-Beverly D. D. 
L 400 Waldron L. D. 
L 385 Riverside-Quindaro D. D. 
R 351 Atherton L. D. 
L 330-345 Orrick L. D. 
L 319-325 Henrietta-Crooked River D. D. 
L 246 Brunswick-Dalton D. D. 
L 15 North County L. D. 
Remaining units 
19.1 
4.1 
4.4 
16.0 
11.5 
8.2 
10.8 
13.8 
15.6 
17.3 
10.7 
12.2 
7.6 
6.5 
15.9 
43.4 
35.0 
20.0 
40.0 
Complete-1958 
Complete-1954 
Complete-1970 
Complete-1962 
Complete-1955 
Complete-1954 
Complete-1956 
Complete-1968 
Complete-1967 
Complete-1957 
Complete-1959 
Complete (Levee raise modification)-1972 
Complete-1957 
Planning underway 
Complete-1966 
Inactive 
Planning underway 
Complete-1983 
Inactive 
Detailed planning not initiated 
20-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 20-I KANSAS CITY DISTRICT PROJECTS INCLUDED IN 
PICK-SLOAN MISSOURI BASIN PROGRAM 
(See Section 15 of Text) 
Project 
Abilene, Smoky Hill River, KS 
Bartley, Republican River, NE 
Fort Scott Lake, Marmaton River, KS 
Garnett Lake, Pottawatomie Creek, KS1I 
Harlan County Lake, Republican River, NE 
Harry S. Truman Dam and Reservoir, Osage River, MO 
Hillsdale Lake, Big Bull Creek, KS 
Indianola, Republican River, NE 
Kanopolis Lake, Smoky Hill River, KS 
Lawrence, Kansas River, KS 
Manhattan, Kansas River, KS 
Melvern Lake, Osage (Marais des Cygnes) River, KS 
Melvern Lake and Pomona Lake (Road Improvement), 
KS (1974 Authorization)3 
Milford Lake, Republican River, KS 
Missouri River Levee System, Rulo to the Mouth 4 
Osawatomie, Osage (Marais des Cygnes) River, KS 
Ottawa, Osage (Marais des Cygnes) River, KS 
Perry Lake, Delaware River, KS 
Pomme de Terre Lake, Pomme de Terre River, MO 
Pomona Lake, Osage River Basin, KS 
Salina, Smoky Hill River, KS 
Stockton Lake, Sac River, MO 
Topeka, Kansas River, KS 
Tuttle Creek Lake, Big Blue River, KS 
Tuttle Creek Lake, KS-Road and Bridge (1976 Act) 
Tuttle Creek Lake (Road Improvement), KS (1974 Modification) 1 
Wilson Lake, Saline River, KS 
Estimated 
Federal 
Cost 
$ 1,099,350 
118,269 
84,000,000 
71,4662 
48,129,549 
549,000,000 
64,161,400 
67,275 
12,577,227 
8,620,111 
2,488,585 
37,436,530 
500,000 
49,566,492 
100,950,000 
2,036,624 
4,462,661 
49,095,918 
17,365,453 
14,003,238 
3,878,668 
80,008,057 
21,174,593 
80,584,079 
630,000 
500,000 
20,463,367 
1. Deauthorized by Water Resources Development Act of 
1986, P.L. 99-662. 
2. Total Federal funds expended. 
3. Inactive. 
TABLE 20-J 
4. Active portion of project. Deferred portion of project is 
currently estimated to cost (1987) $46,753,000 Federal and 
$4,336,000 non-Federal. Inactive portion of project is currently 
estimated to cost (1987) $321,839,000 Federal and 
$29,468,000 non-Federal. Actual cost of deauthorized units was 
$57,000 Federal. 
INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
(See Section 23 of Text) 
Location Month Inspected 
Missouri River Main Stem 
Missouri River Levees: R 512-513, R 500, Kimsey Holly Creek, L 497, L 488, 
R 482, L 476, R 460-471, L 455, L 443-448, R 440, L 408, L 400 and R 351, L 246 
Kansas Citys, Missouri and Kansas: Argentine, Armourdale, 
Birmingham, CID (Mo & Kans), East Bottoms, Fairfax-Jersey 
Creek, North Kansas City Units, and GSA Federal Complex 
Osage River, Kansas and Missouri 
Ottawa, Kansas 
Osawatomie, Kansas 
Kansas River and Minor Tributaries 
Topeka, Kansas; Auburndale, North Topeka, Oakland, Soldier 
Creek, South Topeka, and Waterworks Units 
Republican River, Nebraska and Kansas 
Bartley, Nebraska 
Smoky Hill, Saline, and Solomon Rivers 
Abilene, Kansas 
Mar/Sep 87 
Mar/Sep 87 
Oct 86/Apr 87 
Oct 86/Apr 87 
Oct 86/Apr 87 
May/Sep 87 
Nov 86/May 87 
20-20 
Estimated 
Non-Federal 
Cost 
$ 287,000 
9,500 
41,200,000 
132,928,000 
23,342,756 
7,592 
2,130,000 
265,000 
214,300 
21,250,000 
348,300 
876,000 
1,960,000 
17,458,000 
10,383,492 
610,000 
214,300 
- --- ----

TABLE 20-K 
KANSAS CITY, MO., DISTRICT 
ACTIVE GENERAL INVESTIGATIONS 
(See Section 28 of Text) 
Item and CWIS Number 
SURVEYS (Category 100) 
Flood Damage Prevention Studies (120) 
Blue River Basin, KS & MO - 12382 
Kansas and Osage Rivers, Kansas - 12204 
Osage River above Harry S. Truman Dam - 14063 
St. Joseph, MO, & Vicinity - 12433 
Turkey Creek, KS & MO - 12381 
Subtotal 
Review of Authorized Projects (160) 
Review for Deauthorization - 77000 
Subtotal 
Miscellaneous Activities (170) 
Special Investigations -17250 
FERC Licensing - 53857 
Subtotal 
Coordination Studies with Other Agencies (180) 
Soil Conservation Service, Dept. Agric. (181) - 51840 
Bureau of Reclamation, Dept. Interior (182) - 51820 
Regional Planning (183) - 53847 
Planning Assistance to States (186) - 14820 
Technical Assistance for Streambank Erosion (188) - 51731 
Subtotal 
TOTAL (Category 100) 
COLLECTION AND STUDY OF BASIC DATA (Category 200) 
Flood Plain Management Services (250) - 82030/40 
Hydrologic Studies (260) - 53820 
TOTAL (Category 200) 
CONTINUATION OF PLANNING AND ENGINEERING 
(Category 400) 
Brush Creek, Kansas City, MO (451) - 12319 
TOTAL (Category 400) 
GRAND TOTAL GENERAL INVESTIGATIONS 
20-21 
Federal Cost 
FY 87 
Totals By 
Categories 
$65,381 
56,115 
197,603 
182,434 
270,660 
$762,193 
$ 4,184 
$ 4,184 
$ 65,127 
2,323 
$ 67,450 
$ 9,214 
16,727 
5,298 
58,024 
7,342 
$96,605 
$930,432 
$149,718 
39,022 
$188,740 
$510,235 
$510,235 
$1,629,407

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 20-L FLOOD CONTROL ACTIVITIES 
UNDER SPECIAL AUTHORIZATION 
(See Section 25 of Text) 
Fiscal 
Year 
Study Status 1 Cost 
Flood Control Activities Pursuant to Section 205, Public Law 858, 
80th Congress, as Amended 
Hays, Lincoln Draw, KS F $76,220 
Bedford, East Fork 102 River, IA R 22,586 
Fairway, Rock Creek, KS R 17,235 
Deshler, Snake & Spring Creeks, NE R 8,545 
DeWitt, Big Blue River & Turkey Creek, NE R 8,332 
TOTAL FOR 5 ACTIVE PROJECTS: $132,918 
5 Section 205 studies were terminated in FY 1987, total $36,465 
TOTAL ALL PROJECTS $169,383 
Emergency Streambank Protection - Sec. 14, 1946 Flood 
Control Act, Public Law 526, 79th Congress 
July 24, 1946, as Amended 
West Fork Grand River, Ringgold County, IA, Redding Bridge P $13,375 
West Fork Grand River, Ringgold County, IA, Parker Bridge R 7,283 
Weldon River, Decatur County, IA, Bridge #J2140 R 5,804 
East Nodaway River, Page County, IA, Waterline & Road R 651 
Middle Nodaway River, Adair County, IA, Site 2 R 3,447 
Little Blue River, Marshall County, KS, FAS Road 1108 O 72,909 
Wakarusa River, Baldwin City, KS, City Waterline O 117,957 
Trib Kill Creek, DeSoto, KS, Sewage Treatment Plant R 10,736 
Wakarusa River, Douglas County, KS, Blue Mound Bridge R 7,089 
Marais Des Cygnes River, Osawatomie, KS, Water Wells R 5,779 
Little Blue River, Washington County, KS, Spence Bridge R 5,974 
Little Blue River, Washington County, KS, Site 1 R 5,935 
West Fork Wolf River, Brown County, KS, Avenue Road Bridge R 6,876 
Gregg Creek, Brown County, KS, Granada Bridge R 7,099 
Delaware River, KS, Kickapoo Indian Water Supply Intake R 2,162 
Nodaway River, Andrew County, MO, Road T O 74,352 
Kimsey Creek, Holt County, MO, Casteel Bridge O 2,473 
Nodaway River, Andrew & Holt Counties, MO, Fillmore Bridge O 3,638 
Osage River, Miller County, MO, Road HH O 1,720 
Chariton River, Schuyler County, MO, Eason Bridge R 7,500 
Greggs Creek, Glasgow, MO, Sewage Lift Station & Road R 5,651 
Big Blue River, Saline County, NE, Tuxedo Park Road & Bridge O 44 
Yankee Creek, Johnson County, NE, Vesta Bridge O 7,944 
Yankee Creek, Johnson County, NE, West Tecumseh Bridge O 3,685 
Turkey Creek, Fillmore County, NE, Road & Bridge #123 O 15,183 
Turkey Creek, Fillmore County, NE, Road & Bridge #385 O 31,257 
Little Blue River, Adams County, NE, Road & Bridge- Pauline O 31,198 
Little Blue River, Adams County, NE, Road & Bridge - Pimpel O 62,716 
Little Blue River, Adams County, NE, Road & Bridge - Overy O 8,829 
Beaver Creek, Webster County, NE, Road & Bridge #43430 O 15,909 
Elm Creek, Webster County, NE, Road & Bridge #33425 O 12,219 
Elm Creek, Webster County, NE, Road & Bridge #23015 O 23,783 
Beaver Creek, Webster County, NE, Road & Bridge #23025 0 16,071 
Beaver Creek, Webster County, NE, Road & Bridge #14710 O 16,509 
Little Blue River, Clay County, NE, Weyenberg Bridge P 11,324 
Little Blue River, Nuckolls County, NE, Bridge #4525 P 16,604 
Little Blue River, Thayer County, NE, Gilead North Bridge R 5,884 
Big Blue River, Blue Springs, NE, Sewerline R 1,065 
Big Blue River, Gage County, NE, Grant TWP S18 R 427 
Big Blue River, Gage County, NE,Wymore TWP Bridge R 2,871 
Big Blue River, Gage County, NE, Rockford TWP Road R 754 
Big Blue River, Gage County, NE, Grant TWP Bridge R 629 
20-22

KANSAS CITY, MO., DISTRICT 
TABLE 20-L (Continued) FLOOD CONTROL ACTIVITIES 
UNDER SPECIAL AUTHORIZATION 
(See Section 25 of Text) 
Fiscal 
Year 
Study Status' Cost 
Emergency Streambank Protection - Sec. 14, 1946 Flood 
Control Act, Public Law 526, 79th Congress 
July 24, 1946, as Amended - cont'd 
Big Blue River, Gage County, NE,Wymore TWP Bridge R 2,871 
Big Blue River, Gage County, NE, Rockford TWP Road R 754 
Big Blue River, Gage County, NE, Grant TWP Bridge R 629 
TOTAL FOR 42 ACTIVE PROJECTS IN FY 87: $653,315 
4 studies were terminated in FY 1987, total $22,444 
TOTAL ALL PROJECTS $675,759 
Emergency Flood Control Activities - Repair, Flood 
Fighting, and Rescue Work - Public Law 99 
84th Congress and Antecedent Legislation 
Disaster Preparedness Program $308,806 
Flood Fighting and Rescue Work 354,051 
Rehabilitation 2,371,192 
TOTAL $3,034,049 
1. Status: R = Recon; F = Feasibility; P = P&S; C = Construction; 0 = Operational 
20-23

OMAHA, NE, DISTRICT * 
This district comprises portions of Montana, Wyo- drainage basin of Missouri River along main stem and 
ming, North Dakota, South Dakota, Minnesota, Colo- tributaries to Rulo, NE. 
rado, Nebraska, Iowa, and Missouri, all embraced in 
IMPROVEMENTS 
Navigation 
1. Missouri River, Sioux City, IA 
to Rulo, NE................. 
2. Navigation Work Under Special 
Authorization ................. 
Page 
.21-2 
.21-2 
Flood Control 
3. Bear Creek Lake, CO .................... 21-2 
4. Bowman-Haley Lake, ND ................. 21-2 
5. Chatfield Lake, CO ....................... 21-2 
6. Cherry Creek Lake, CO ................... 21-3 
7. Fall River Basin, SD ..................... 21-3 
8. Great Falls, MT ............... ........... 21-3 
9. Little Sioux River, IA .................... 21-4 
10. Lost Creek atColumbus, NE ............... 21-4 
11. Missouri National Recreational 
River, NE and SD ...... . ............... .21-4 
12. Missouri River, Kenslers Bend, 
NE to Sioux City, IA ..................... 21-4 
13. Missouri River Levee System, 
Sioux City, IA to Rulo, NE ............... 21-4 
14. Papillion Creek and Tributaries 
Lakes,N E .............. ..... ........... 21-5 
15. Pick-Sloan Missouri River Basin 
Program (Omaha Dist) .................... 21-5 
16. Pipestem Lake, ND ....................... 21-5 
17. Salt Creek & Tributaries, NE .............. 21-5 
18. South Platte River Basin, CO .............. 21-6 
19. Inspection of Completed Flood 
Control Works ........................ 21-6 
20. Scheduling Flood Control 
Reservoir Operations ...................... 21-6 
21. Flood Control Activities Under 
Special Authorization .................. .. 21-6 
Multiple Purpose Projects Including Power Page 
22. Big Bend Dam-Lake Sharpe, 
Missouri River Basin, SD ................ 21-7 
23. Fort Peck Lake, MT.....................21-7 
24. Fort Randall Dam-Lake Francis Case, 
Missouri River Basin, SD ................ 21-7 
25. Garrison Dam-Lake Sakakawea, 
Missouri River Basin, ND ................ 21-7 
26. Gavins Point Dam-Lewis and Clark Lake, 
Missouri River Basin, NE and SD .......... 21-8 
27. Oahe Dam-Lake Oahe, Missouri 
River Basin, SD and ND ................. 21-8 
Miscellaneous 
28. National Emergency Preparedness. ......... 21-8 
General Investigations 
29. See Table 21-K .......................... 21-8 
Tables 
21-A Cost and Financial Statement ........... 21-9 
21-B Authorizing Legislation ............... 21-12 
21-C Other Authorized Navigation Projects .... 21-15 
21-D Not Applicable 
21-E Other Authorized Flood Control Projects.. 21-15 
21-F Other Multiple Purpose Projects 
Including Power ...................... 21-17 
21-G Deauthorized Projects ................ 21-17 
21-H Missouri River Levee System, 
SiouxCity, IA to Rulo, NE ............. 21-18 
21-I Pick-Sloan Missouri Basin Program ...... 21-18 
21-J Inspection of Completed Local 
Protection Projects .................. .21-18 
21-K Active General Investigations .......... 21-21 
21-L Flood Control Activities 
Under Special Authorization ............ 21-22 
21-1 
. . . . . . . . . . 
. . . . . . . . . .

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. MISSOURI RIVER, SIOUX CITY, IA 
TO MOUTH (SIOUX CITY, IA 
TO RULO, NE) 
Location. Channel of the Missouri River extending 
from Sioux City, IA to Rulo, NE. 
Previous projects. For details see page 1893, Annual 
Report for 1915, and page 1175, Annual Report for 
1938. 
Existing project. Provides for a navigation channel of 
9-foot depth and width not less than 300 feet, obtained 
by revetment of banks, rock dikes to contract and stabilize 
waterway, cutoffs to eliminate long bends, closing 
minor channels, and removal of snags and dredging as 
required. Construction was initiated on this section of 
the project (Sioux City to Rulob) in fiscal year 1928, the 
bank stabilization work was completed in April 1979, 
and the navigation feature was completed in September 
1980. A reliable channel suitable for navigation is available 
through this section. Controlling depth at ordinary 
stages of the river is 9 feet, with additional depths available 
during high stages. Commercial navigation was inaugurated 
on this section in May 1939, and common carrier 
transportation service was inaugurated in October 
1946. Seven riverside recreation sites are complete and 
in operation. Total cost of new work Sioux City, IA to 
Rulo, NE is $189,226,000 (1987), of which $187,639,000 
is the Federal cost of construction and $1,587,000 is the 
non-Federal cost, exclusive of amounts expended on previous 
projects. 
Local cooperation. Local interests must share in cost 
of recreation facilities in accordance with provisions of 
the Federal Water Project Recreation Act of 1965. Local 
interests have contributed for cost sharing on construction 
of recreation by constructing portions of the facilities. 
Terminal facilities. Terminal facilities for loading 
and unloading grain, liquids and dry bulk products are 
maintained by private interests at various locations on 
this section of the river. A complete list of terminal facilities 
are included in the Missouri River Navigation 
Maps and can be obtained from the Omaha District for a 
small fee. 
Operations during fiscal year. Maintenance: Continued 
routine operation and maintenance activities. 
Local interests operate and maintain the recreation 
sites. 
2. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Small Navigation Projects Not Specifically Authorized 
by Congress (Sec. 107 of the River and Harbor Act 
of 1960, as amended, Public Law 645, 86th Congress). 
No work during the period. 
Flood Control 
3. BEAR CREEK LAKE, CO 
Location. Damsite is on Bear Creek in Jefferson 
County, CO about 8 miles above the confluence of Bear 
Creek with the South Platte River at Denver. 
Existing project. Earthfill dam 180 feet high, with a 
crest length of about 5,300 feet, and a supplementary 
earthfill dike with a height of 65 feet and a crest length 
of 2,100 feet, to the south of the main dam, and an uncontrolled 
earth and rock-cut emergency spillway. The 
lake provides storage capacity of 28,831 acre-feet for 
flood control and 1,979 acre-feet for sediment and recreation. 
Construction of the project was initiated in October 
1973 and was completed in September 1982, exclusive 
of recreation facilities. The total cost of construction 
was $61,503,600. Recreation facilities were developed 
utilizing cost sharing funds at an additional 
cost of $500,000. 
Local cooperation. Requirements are described in full 
on page 21-3 of fiscal year 1981 Annual Report. 
Operations during fiscal year. Maintenance: Work by 
hired labor included miscellaneous items of ordinary repair 
and maintenance. Annual project visitation hours 
were estimated at 195,392. 
4. BOWMAN-HALEY LAKE, ND 
Location. Damsite is on North Fork of Grand River in 
southwestern North Dakota, about 6 miles above 
Haley, ND. 
Existing project. A dam 79 feet high, with a crest 
length of 5,730 feet, and reservoir with a storage capacity 
of about 19,780 acre-feet for sediment storage, 
fish and wildlife conservation, recreation, and future 
water supply for communities of Bowman, Reeder, 
Scranton, and Gascoyne, ND. Construction was initiated 
in July 1964, and the project was completed in 
1970. (See Table 21-A for total cost of construction.) 
Local cooperation. Local interests must prevent encroachment 
on capacity of North Fork channel below 
reservoir; obtain water rights for storage; pay the 
United States for costs allocated to water supply; and 
hold the United States free from damages. Assurances 
of local cooperation were approved June 19, 1964. With 
respect to water rights, requirements have been complied 
with. A contract with the Bowman County Water 
Management District for water storage space was 
signed November 10, 1981. 
Operations during fiscal year. Maintenance: Continued 
routine operation and maintenance activities. 
Annual project visitation hours were estimated at 
112,904. 
5. CHATFIELD LAKE, CO 
Location. On the South Platte River, just below the 
mouth of Plum Creek, about eight miles upstream from 
Denver, CO. 
Existing project. Consists of rolled earth-fill dam 
with a maximum height of 148 feet, a crest length of 
21-2

OMAHA, NE, DISTRICT 
12,500 feet, and a reservoir with flood control capacity 
of 204,737 acre-feet and sediment capacity of 26,692 
acre-feet, which will be used for recreation, and an enlarged 
channel from the dam downstream to Denver to 
accommodate reservoir flood releases. 
The Corps is participating with local interests in acquisition 
of lands and development of recreation facilities 
immediately downstream of the Chatfield Dam in 
lieu of a portion of the channel improvement. Construction 
of the project was initiated in August 1967 and is 
99 percent complete, with a scheduled completion date 
in FY 1989. Construction is essentially complete at the 
project with the exception of the downstream channel 
improvement, associated recreation facilities and fish 
and wildlife mitigation measures. Estimated cost 
through construction of the project is $105,060,000 
(1987) of which $95,100,000 is the Federal cost for construction, 
$7,060,000 local cost in connection with the 
downstream channel improvement, and $2,900,000 is 
the local cost for acquisition of water for the recreation 
pool. 
Local cooperation. Section 3, Flood Control Act of 
June 22, 1936 applies to the downstream channel improvement. 
The Colorado Water Conservation Board 
provided assurances of local cooperation for the downstream 
improvement on December 13, 1967. Local interests 
must provide water for filling the sediment reserve 
pool for recreation use which the state agreed to on 
April 25, 1967. 
Operations during fiscal year. Continued design by 
hired labor. Completed construction on Stage II of the 
downstream channel improvements. Continued construction 
on Stage III of the downstream channel improvements. 
Maintenance: Continued routine operation 
and maintenance activities. Annual project visitation 
hours were estimated at 2,020,302. 
6. CHERRY CREEK LAKE, CO 
Location. Damsite is on Cherry Creek in Arapahoe 
County, CO, approximately 6 miles southeast of Denver, 
CO just outside of city limits. Cherry Creek joins 
South Platte River within city limits of Denver. 
Existing project. A rolled-earthfill dam with maximum 
height of 141 feet above streambed and 14,300 
feet long. Project includes a reinforced concrete outlet 
works and an uncontrolled side channel spillway canal 
discharging into adjacent Toll Gate Creek. Cherry Creek 
project provides reservoir storage capacity of 93,920 
acre-feet below spillway canal invert and, in addition, a 
surcharge storage of 134,470 acre-feet. Plan of operation 
in ultimate development for multiple-purpose uses includes 
13,960 acre-feet for sediment storage and 79,960 
acre-feet for conservation purposes. Construction began 
in fiscal year 1946 and was completed in June 1961, exclusive 
of recreation facilities. Federal cost of the project 
was $15,220,000. 
Local cooperation. None required except for recreation 
cost-sharing. 
Operations during fiscal year. Maintenance: Continued 
routine operation and maintenance activities. 
Annual project visitation hours were estimated at 
1,249,854. 
7. FALL RIVER BASIN, SD 
Location. In Custer and Fall River Counties, in and 
near the town of Hot Springs, SD. Hot Springs unit is in 
the town of Hot Springs, immediately south of the junction 
of Cold Brook and Hot Brook which combine to 
form the Fall River. Cold Brook Lake unit is approximately 
1.25 miles north of the town of Hot Springs on 
Cold Brook; and Cottonwood Springs Lake unit is approximately 
4.5 miles west of the town of Hot Springs 
on Cottonwood Springs Creek, one-half mile upstream 
from its confluence with Hot Brook. 
Existing project. The general plan of improvement 
provides flood protection for Hot Springs, SD. The Hot 
Springs channel improvement unit consisted of widening, 
deepening and straightening 6,000 feet of channel 
of Fall River. The Cold Brook Lake unit, an earth-fill 
dam with appurtenant structures, controls an area of 
70.5 square miles. The Cottonwood Springs Lake unit 
consists of an earth-fill dam with appurtenant structures 
and controls an area of 26 square miles. Construction 
of Hot Springs unit was completed during fiscal 
year 1951. Construction of Cold Brook unit dam and appurtenances 
was completed in fiscal year 1953 with exception 
of a road and parking area which were completed 
in fiscal year 1955. Construction of the Cottonwood 
Springs unit dam was completed in fiscal year 
1970, with the exception of the recreation facilities 
which were completed in fiscal year 1972. (See Table 
21-A for total cost of construction.) For last funding see 
FY 1981 Annual Report. 
Local cooperation. Local cooperation requirements 
have been fully complied with. 
Operations during fiscal year. Maintenance: Routine 
operation and maintenance activities were continued on 
the Cottonwood Springs and Cold Brook Dams and 
structures. Annual project visitation hours were 
estimatedat 121,034. 
8. GREAT FALLS, MT 
Location. In Great Falls, Cascade County, MT at confluence 
of the Sun and Missouri Rivers. 
Existing project. Provides for levees along the left 
bank of the Sun River and an interceptor ditch and 
closed conduit to collect and convey side-hill runoff to 
the Sun River. Estimated cost through construction of 
the project is $13,987,000 of which $11,937,000 is the 
Federal cost of construction and $2,050,000 is the local 
cost for lands, relocations and a cash contribution for replacement 
of a storm sewer conduit desired by local interests. 
Local cooperation. Section 3. Flood Control Act of 
June 22, 1936 applies. In addition local interests must 
zone the unleveed portion of the flood channel through 
the damage area to preserve its capacity and to prevent 
further encroachments and contribute in cash $179,000 
representing the estimated cost of replaced storm drainage 
facilities which will be incorporated into the closed 
21-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
conduit of the Watson Coulee Interceptor. West Great 
Falls Flood Control and Drainage District provided assurances 
on January 17, 1968. State Supreme Court decision 
on assessments required a change in state law, 
which was enacted in 1973. The final court ruling on 
compliance was made April 1, 1981, and the local sponsor 
was instructed to proceed toward project construction. 
Operations during fiscal year. Completed work on 
Sun River repair and mitigation planting. Work continued 
on the O&M manuals. 
9. LITTLE SIOUX RIVER, IA 
Location. The project is located in the lower portion 
of the Little Sioux River Basin in Harrison and Monona 
Counties, IA, near the confluence of the Little Sioux and 
Missouri Rivers. 
Previous Project. For details see page 646, Annual 
Report for 1970. 
Existing project. Construction of the original project 
was completed in June 1966. Sill No. 4 was identified as 
a design deficiency in a June 17, 1981 report by the 
Omaha District, approved by OCE. Based on that report, 
design studies for a permanent solution to the 
problem were completed. Estimated cost of the new 
work is $5,123,000 (1987) of which $5,117,000 is the 
Federal cost, and $6,000 is non-Federal cost. 
Local cooperation. The Little Sioux Inter-County 
Drainage District was sponsor of that portion of the 
original project where the remedial work is being accomplished. 
Remedial work was 100 percent Federally 
funded. 
Operations during fiscal year. Ice and debris accompanying 
high flows during the spring of 1986 caused extensive 
damage to the bed grade control structure (Sill 
No. 4) that was constructed during the winter of 1985 to 
correct a design deficiency of the original project. A contract 
for repairing the damage was awarded 4 May 1987. 
10. LOST CREEK AT COLUMBUS, NE 
Location. On Lost Creek just north of the City of Columbus 
in Platte County, NE. 
Existing project. This project provides levee and 
channel improvements on the north side of Columbus 
and provides protection to commercial and residential 
areas. The estimated cost of the construction is 
$4,330,000 (1987) of which $3,470,000 is the Federal 
cost, and $860,000 is non-Federal contributed funds - 
other, that provides for all necessary right of way, utility, 
and bridge relocations. 
Local cooperation. A contract with the City of Columbus 
to sponsor the project was approved on February 
18, 1982. 
Operations during fiscal year. Completed work on 
Stage II. The final inspection was made on 28 Oct 86. At 
that time several project deficiencies were identified 
which are currently being corrected. Work continued on 
the O&M manuals. 
11. MISSOURI NATIONAL RECREATIONAL 
RIVER, NE, AND SD 
Location. NE and SD. The Missouri River between 
Gavins Point Dam and Ponca State Park, NE. This includes 
Cedar and Dixon Counties in Nebraska, and 
Yankton, Clay, and Union Counties in South Dakota. 
Existing project. The designation as a National Recreational 
River will preserve outstanding and important 
scenic values and will provide additional opportunities 
for river access and recreation use. Erosion control, consisting 
of bank stabilization and river management 
techniques designed to preserve the existing environment, 
will at the same time preserve high bank flood 
plain lands. Estimated total cost of construction is 
$21,030,000 (1987) of which $21,000,000 is the Federal 
cost of construction and $30,000 is the non-Federal contributed 
funds - other costs. 
Local cooperation. All construction on this project 
will be done in accordance with the cost sharing and 
financing concepts reflected in the Water Resources 
Development Act of 1986. A cost-sharing contract with 
the State of South Dakota for the Myron Grove access 
site was signed on June 26, 1986. 
Operations during fiscal year. Completed construction 
on the Myron Grove access site. Efforts to protect 
Federally listed threatened and endangered species continued. 
12. MISSOURI RIVER, KENSLERS 
BEND, NE, TO SIOUX CITY, IA 
Location. Project is along Missouri River between 
Ponca Bend, NE, and combination bridge at Sioux City, 
IA.
Existing project. Construction of dikes, revetments 
and channel improvement along Missouri River from 
Miners Bend and vicinity, SD and NE, to Sioux City, 
IA. Project was started in June 1946 and completed in 
June 1961. (See Table 21-A for total costs.) 
Local cooperation. Fully complied with. 
Operations during fiscal year. Routine operation and 
maintenance activities continued. 
13. MISSOURI RIVER LEVEE SYSTEM, 
IOWA, NEBRASKA, KANSAS AND 
MISSOURI (SIOUX CITY, IA 
TO RULO, NE) 
Location. On both banks of the Missouri River from 
Sioux City, IA to St. Louis, MO. Active portion of the 
project in Omaha District extends from Council Bluffs, 
IA to Rulo, NE. 
Existing project. A series of levee units and appurtenant 
works along both sides of Missouri River from 
Sioux City, IA, to mouth, for protection of agricultural 
lands and small communities against floods. Construction 
was initiated June 1948. (See Table 21-H for status 
of active units). Construction was initiated on Levee 
Unit L-611-614 in September 1980 and is 99 percent 
complete. Construction of Unit R-616 was initiated in 
21-4

OMAHA, NE, DISTRICT 
May 1983 and is complete. Cost estimate for active portion 
of project from Council Bluffs, IA to Rulo, NE is 
$42,511,000 (1987) of which $37,911,000 is Federal cost 
for construction and $4,600,000 local costs for lands and 
damages. 
Local cooperation. Section 3, Flood Control Act of 
June 22, 1936 applies. Fully complied with for all completed 
units. Local interests have furnished assurances 
of their willingness and ability to fulfill local cooperation 
requirements for the remaining active units. 
Operations during fiscal year. Completed construction 
on Levee Unit R-616 and on Stage 2 Fish & Wildlife 
Facilities and Stage 3 on Levee Unit L-611-614. Construction 
is complete except for drainage structure modifications 
and some other minor deficiencies on Levee 
Unit L-611-614. 
14. PAPILLION CREEK AND 
TRIBUTARIES LAKES, NE 
Location. The Papillion Creek basin is located in 
Washington, Douglas, and Sarpy Counties, NE. Big Papillion 
Creek rises west of Blair, flows southeasterly 
through metropolitan Omaha area where it is joined by 
the Little Papillion Creek just above Offutt AFB, forming 
Papillion Creek. The combined creek flows along the 
side of Offutt AFB to its confluence with the Missouri 
River. 
Existing project. The active project consists of a 
series of four dams and reservoirs, channel improvement 
and a flood warning system on tributaries of Papillion 
Creek. Construction was initiated in FY 1972. Completed 
projects include Standing Bear Lake (Site 16) 
December 1978 and Glenn Cunningham Lake (Site 11) 
December 1979. Construction of the dam portions of 
Sites 18 and 20 are complete. Remaining work includes 
construction of recreational facilities at both sites and 
channel improvement on the Big Papio Channel. Estimated 
total costs for the project are $57,300,000 
Federal funds with $2,477,000 non-Federal reimbursement. 
Local cooperation. Requirements are described in full 
on page 21-6 of fiscal year 1981 Annual Report. 
Operations during fiscal year. Preconstruction engineering 
and design studies were initiated in July 1987 
for the Big Papio Channel. Design for Sites 18 and 20 
continued by hired labor. Construction continued at 
Sites 18 and 20. Maintenance: Routine operations and 
maintenance activities continued at Sites 11 and 16. Annual 
project visitation hours were estimated at 
1,494,063. 
15. PICK-SLOAN MISSOURI BASIN 
PROGRAM (OMAHA DISTRICT) 
Location. Flood control improvements in this project 
are along Missouri River and several of its principal 
tributaries and in states comprising Missouri River 
Basin. 
Existing project. A general comprehensive plan for 
flood control and other purposes in Missouri River 
Basin provides for levees along Missouri River between 
Sioux City, IA, and mouth and reservoirs on main stem 
of Missouri River and tributaries. See individual reports 
and Table 21-I for projects in the Omaha District included 
in the program. 
16. PIPESTEM LAKE, ND 
Location. On Pipestem Creek in Stutsman County, 
ND, 3 miles upstream from where Pipestem Creek joins 
the James River at Jamestown, ND. 
Existing project. The project consists of a rolled 
earth-fill dam approximately 108 feet high with a crest 
length of 4,000 feet and outlet works of a gated reinforced 
concrete conduit. The reservoir provides 146,880 
acre-feet of storage. The multipurpose pool provides 
space for silt storage and 885 acres of water surface for 
fish, wildlife and recreation needs. Construction of the 
project was initiated in FY 1970 and completed in FY 
1977. (See Table 21-A for total construction costs.) 
Local cooperation. Local interests are required to administer 
project land and water areas for recreation and 
fish and wildlife enhancement and to bear the first cost 
of associated improvements in the wildlife management 
area; pay, contribute in kind, or repay, with interest, 
one-half of the separable cost of the project allocated to 
recreation and fish and wildlife enhancement; and bear 
all costs of operation, maintenance, and replacement of 
recreation and fish and wildlife lands and facilities. 
Operations during fiscal year. Routine operation and 
maintenance activities continued. Annual project visitation 
hours were estimated at 112,104. 
17. SALT CREEK AND TRIBUTARIES, NE 
Location. Salt Creek Basin comprises an area of 
about 1,627 square miles in and around Lincoln in 
southeastern Nebraska. 
Existing project. The authorized project consists of a 
system of 10 dams and reservoirs, channel clearing, enlarging 
and realignment, levees and necessary bridge alterations. 
Pursuant to Senate Resolution adopted 
August 7, 1964, which authorized a review of Salt Creek 
survey report, remaining units were placed in 
"inactive" classification. Construction of the project began 
in the spring of 1962. All work under the active portion 
of the project, consisting of the 10 dams and reservoirs 
and the channel improvements and levees through 
Lincoln, was completed in 1969. Funds were transferred 
to the project in FY 1980 with concurrence of Congressional 
Committees. These funds were used to determine 
an effective method of correction for the dispersive clay 
problem in the completed downstream levees through 
Lincoln. (See Table 21-A for total construction costs.) 
Local cooperation. Fully complied with for the completed 
levee and channel improvement part of the project. 
For the dams, local interests are required to operate 
and maintain the permanent pools for fish and wildlife 
conservation and assume all costs related to utilization 
of the permanent pools for recreational purposes and insure 
public access to the pools. 
21-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Operations during fiscal year. Maintenance: Routine 
operation and maintenance activities continued. Annual 
visitation hours to the system of dams were estimated 
at 4,543,011. 
18. SOUTH PLATTE RIVER BASIN, CO 
Location. Flood control improvements in this project 
are along the South Platte River and its tributaries in 
Colorado. 
Existing project. General plan for flood control and 
other purposes provides for construction of Chatfield 
Lake on the South Platte River, Bear Creek Lake on 
Bear Creek, and levee and channel improvements on the 
South Platte River. (See individual reports and Table 
21-B for authorizing legislation). 
19. INSPECTION OF COMPLETED 
FLOOD CONTROL WORKS 
Flood Control Act of June 22, 1936, and subsequent 
acts require local interests to furnish assurances that 
they will maintain and operate certain local protection 
projects after completion, in accordance with regulations 
prescribed by Secretary of the Army. District Engineers 
are responsible for administration of these regulations 
within the boundaries of their respective districts. 
Inspections of completed local protection projects 
which have been turned over to local interests for maintenance 
and operation during the fiscal year are set 
forth in Table 21-J, Inspections of Completed Local Protection 
Projects. Fiscal year costs were $209,511. 
Inspection of Non Federal flood protection works was 
initiated in FY 1984. The cost incurred for FY 1987 was 
$325,962. 
20. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Under sections 7 and 9, Flood Control Act of December 
22, 1944, Corps of Engineers is responsible for detailed 
scheduling of operations involving storage capacity 
reserved for or assigned to flood control in reservoirs 
constructed by Bureau of Reclamation as well as those 
constructed by Corps of Engineers. Costs for FY 1987 
were $278,567 and total costs to September 30, 1987 
were $5,088,333. 
21. FLOOD CONTROL ACTIVITIES 
UNDER SPECIAL AUTHORIZATION 
Emergency Flood Control Activities - Repair, Flood 
Fighting and Rescue Work (Public Law 99, 84th Cong., 
and antecedent legislation). 
Federal costs for FY 1987 were $341,038 for disaster 
preparedness and emergency operations, and $122,451 
for repair and restoration. 
Small Flood Control Projects Not Specifically Authorized 
by Congress (Sec. 205, 1948 Flood Control Act 
as amended, Public Law 858, 80th Cong., June 30, 1948). 
Stage II construction continued on Lost Creek at Columbus, 
NE. Plans and specifications are being done on 
Pebble Creek, Scribner, NE and Lodge Pole Creek, 
Sidney, NE. Reconnaissance Reports are being prepared 
on Beaverhead River, Twin Bridges, MT; Belfield, ND; 
Cache La Poudre River, Greeley, CO; Carter Lake, NE; 
Dry Creek, Linday, NE; Elkhorn River, Crowell, NE; 
Lodge Creek, Chinook, MT; Maple Creek, East Fork, 
Howells, NE; Milk River, Malta, MT; Nowood River, 
Manderson, WY; Platte River Cedar Creek, NE; Square 
Butte Creek, Center, ND; Thirty Mile Creek, Harlem, 
MT. Verdigre Creek, Verdigre, NE. Detailed Project 
Study is being prepared on Lower Heart River, Mandan, 
ND. Five negative Initial Appraisal Studies were submitted 
during FY 87 at a total cost of $28,085. 
Emergency Bank Protection (Sec. 14, 1946 Flood Control 
Act, Public Law 526, 79th Cong., July 24, 1946). 
Operations under this heading were as follows: Construction 
was completed on 12 projects; Big Sioux 
River, Harrisburg, SD; completed in June 1987; operation 
and maintenance manual completed in February 
1987. Big Sioux River, Sec 4, Plymouth, IA, completed 
October 1986; operation and maintenance manual completed 
in March 1987. Blackbird Creek, Burt Co., NE; 
completed in October 1986, operation and maintenance 
manual completed in February 1987. Elk Creek, Willis, 
NE, completed in November 1987, operation and maintenance 
manual completed in March 1987. Little Sioux 
River, Anthon, IA, completed in March 1987, operation 
and maintenance manual scheduled for completion in 
December 1987. Marne Creek, Yankton, SD, completed 
in September 1987; operation and maintenance manual 
scheduled for completion in February 1988. Medicine 
Bow River, Elk Mountain, WY, completed in September 
1987, operation and maintenance manual completed in 
March 1987. Muddy Creek, Syracuse NE, completed in 
May 1987, operation and maintenance manual scheduled 
for completion in February 1987. South Platte 
River, Fort Lupton, CO completed January 1987, operation 
and maintenance manual completed June 1987. 
South Creek, Martinsburg, NE (Sites 1 & 2) completed 
November 1986 operation and maintenance manual 
completed March 1987. South Platte River, Weldona, 
CO completed November 1986 operation and maintenance 
manual completed March 1987. South Platte 
River, Morgan Co., CO; completed October 1986, operation 
and maintenance manual completed April 1987. 
Plans and specifications are currently being prepared on 
Hauser Lake, MT; James River, Yankton, SD; Logan 
Creek, Bancroft, NE; Muckey Creek, Mapleton, IA; 
Niobrara River, Carns Bridge, Bassett, NE; Platte 
River, North Bend, NE; Platte River, Ginger Cove 
Lagoon, NE; Soldier River, Ute, IA; Waterman Creek, 
O'Brien, Co., IA; and West Nishnabotna, River, Oakland, 
IA. The following projects were initiated in FY 
1987, Battle Creek, Blaine, Co., MT (Unruh Bridge); 
Knife River, Stanton, ND; Lovell Sewage Lagoons, WY; 
Madison River, Madison, MT (HWY 287); Milk River, 
Blaine, Co., MT (Finley Bridge); Milk River, Blaine, Co., 
MT (Zurich Bridge); Milk River, Malta, MT (Sewerline); 
and Yellowstone River, MT (HWY 1-90). 
21-6

OMAHA, NE, DISTRICT 
Multiple-Purpose Projects Including Power 
22. BIG BEND DAM-LAKE SHARPE, 
MISSOURI RIVER BASIN, SD 
Location. On Missouri River, 987.4 miles above 
mouth, near Fort Thompson, SD, and approximately 20 
miles upstream from Chamberlain, SD. Dam is located 
in the upstream reach of Fort Randall Reservoir. Big 
Bend Reservoir extends upstream to Pierre, SD. 
Existing project. A rolled-earthfill dam 95 feet high, 
with a crest length of 10,570 feet, a hydroelectric generating 
plant consisting of eight 58,500 kilowatt units, 
and a chute-type gated spillway. Reservoir provides 
gross storage of 1,883,000 acre-feet. Federal cost of the 
project was $107,498,000. Construction began in September 
1959 and was completed in September 1977, except 
for Code 710 recreation facilities. 
Local cooperation. None required except for recreation 
cost-sharing. 
Operations during fiscal year. Maintenance: Project 
was operated in conjunction with other Missouri River 
reservoirs for flood control, power production and other 
multiple uses. During the period, 1,036,780,000 net kilowatt-
hours of electricity were produced. Installation of a 
power plant controller system for the Missouri River 
dams continued. Initiated work on emergency repair to 
generator unit #1, construction of new administration 
building, purchase spare generator coils, mitigation of 
Whistling Elk archaeological site, and extend relief well 
outfall pipes. Annual project visitation hours were estimated 
at 953,997. 
23. FORT PECK LAKE, MT 
Location. Reservoir is in Missouri River Valley in Mc- 
Cone, Valley, Garfield, Phillips, Petroleum, and Fergus 
Counties, MT. Dam is approximately 1,771.6 miles 
above mouth of Missouri River. Nearest towns are Glasgow, 
17 miles northwest, and Nashua, 9 miles north. 
Existing project. A hydraulic earthfill dam with a 
maximum height of 251 feet, with a crest length of 
21,026 feet, and a reservoir for flood control, irrigation, 
navigation, hydroelectric power, and other purposes, 
with a gross storage capacity of 18,909,000 acre-feet at 
maximum operating pool. Work started on original project 
in October 1933 and on second power plant in August 
1956. The project was completed in 1965. The power 
installations at the project were uprated in FY 1979. 
The 5 generators have a total output of 185,250 KW, 2 
generators at 40,000 KW each, 2 generators at 43,500 
KW each and 1 generator at 18,250 KW. See page 818 of 
1965 Annual Report and page 905 of 1958 Annual Report 
for project details. Federal cost of the project was 
$158,428,000. 
Local cooperation. None required except for recreation 
cost-sharing. 
Operations during fiscal year. Maintenance: Continued 
work on installation of a powerplant controller 
system for the six Missouri River dams. Initiated work 
on replacement of the electrical distribution system 
shaft and spillway areas. Fort Peck Lake was operated 
in conjunction with the other Missouri River reservoirs 
for flood control, navigation, power production, and 
other multi-purpose uses. Generating facilities produced 
829,690,000 net kilowatt hours of electricity. Total cost 
of Operation and Maintenance during the period was 
$4,383,100, however, reimbursement from the Western 
Area Power Administration for the prorata share of 
Operation and Maintenance cost of the power plant reduced 
net cost to $2,455,200. Annual project visitation 
hours were estimated at 529,173. 
24. FORT RANDALL DAM-LAKE FRANCIS 
CASE, MISSOURI RIVER BASIN, SD 
Location. On Missouri River in Charles Mix and 
Gregory Counties, SD, about 82 miles above Yankton, 
SD. Site is 880 miles above mouth of Missouri River and 
148 miles above Sioux City, IA. 
Existing project. A rolled-earthfill dam with a maximum 
height of 165 feet, a crest length of 10,700 feet, 
and a reservoir for flood control, irrigation, navigation, 
hydroelectric power, and other purposes, with a gross 
storage capacity of 5,574,000 acre-feet at maximum operating 
pool. The power installation consists of eight 
units rated at 40,000 kilowatts each. Construction began 
in May 1946 and was completed in 1969, except for 
Code 710 recreation facilities. Federal cost of the project 
was $199,066,000. Non-Federal contribution for constructing 
approaches to the Platte-Winner Bridge was 
$720,000. 
Local cooperation. None required except for recreation 
cost-sharing. 
Operations during fiscal year. Maintenance: Project 
was operated in conjunction with other Missouri River 
reservoirs for flood control, navigation, power production, 
and other multiple uses. Generating facilities produced 
1,957,347,000 net kilowatt-hours of electricity. 
Continued work on installation of a power plant controller 
system for the Missouri River dams, initiated 
work on new maintenance facility, rehabilitate mechanical 
system at power plant, and paint penstock and 
surge tank interiors unit #3. Annual project visitation 
hours were estimated at 2,168,073. 
25. GARRISON DAM-LAKE SAKAKAWEA, 
MISSOURI RIVER BASIN, ND 
Location. On Missouri River in McLean and Mercer 
Counties, ND, about 11 miles south of Garrison, ND, 
and 9 miles west of Coleharbor, ND. 1,389.9 miles above 
mouth of river and 75 miles above Bismarck, ND. 
Existing project. A rolled-earthfill dam 11,300 feet 
long with a maximum height of 210 feet and a reservoir 
for flood control, irrigation, navigation, hydroelectric 
power, and other purposes, with a gross storage capacity 
of 24,137,000 acre-feet. It provides five power units, 
three units rated at 80,000 kilowatts each, and two units 
rated at 95,000 kilowatts each, three flood control tunnels 
and a gated spillway. Federal cost of the project 
was $299,938,000 including $4,208,000 for major rehabilitation. 
Non-Federal contribution in connection with 
21-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
widening Snake Creek Embankment was $687,000. Construction 
of the project was initiated in April 1946 and 
completed in 1966, except for recreational development 
using Code 710 funds. 
Local cooperation. None required except cost sharing 
with the State of North Dakota for widening the Snake 
Creek Embankment and recreation cost-sharing. 
Operations during fiscal year. Maintenance: Project 
was operated in conjunction with the other Missouri 
River reservoirs for flood control, navigation, power production, 
and other multiple purpose uses. Normal operation 
and maintenance procedures were accomplished 
during the fiscal year. Generating facilities produced 
2,175,304,000 net kilowatt-hours of electricity. Continued 
work on installation of a power plant controller 
system for the Missouri River dams. Initiated work on 
powerhouse and intake structure roofing, painting turbine 
and surge tank interiors unit #4, rehabilitate heat 
exchanger, rehabilitate spillway gates and pavement repair. 
Annual project visitation hours were estimated at 
9,787,846. 
26. GAVINS POINT DAM-LEWIS AND 
CLARK LAKE, MISSOURI RIVER 
BASIN, NE AND SD 
Location. On Missouri River in Yankton County, SD, 
and Knox County, NE, about 4 miles upstream from 
Yankton, SD, and 811.1 miles above mouth of river. 
Existing project. A concrete and rolled-earth-fill dam 
with a maximum height of 74 feet and a reservoir for 
flood control, irrigation, navigation, hydroelectric 
power, and other purposes with a gross storage capacity 
of 504,000 acre-feet at maximum operating pool. The 
power installation consists of three units rated at 33,333 
kilowatts each. Federal cost of the project was 
$49,617,000. Construction of original project was initiated 
in March 1952 and was completed in 1964. Project 
is providing its multiple purpose benefits for flood control, 
navigation, power, and other uses. 
Local cooperation. None required except for recreation 
cost-sharing. 
Operations during fiscal year. Maintenance: Project 
was operated in conjunction with other Missouri River 
reservoirs for flood control, navigation, power production 
and other multiple purpose uses. Generating units 
produced 839,255,000 net kilowatt-hours of electricity 
during fiscal year. Continued work on installation of a 
power plant controller system for the Missouri River 
dams. Initiated work on rehabilitation of HVAC and 
renovation of the visitors center. Annual project visitation 
hours were estimated at 5,109,126. 
27. OAHE DAM-LAKE OAHE, MISSOURI 
RIVER BASIN, SD AND ND 
Location. Dam is on Missouri River in Hughes and 
Stanley Counties, SD, about 6 miles northwest of 
Pierre, SD, and 1,072.3 miles above mouth of river. 
Existing project. A rolled-earthfill dam with maximum 
height of 245 feet, a crest length of 9,300 feet, and 
reservoir for flood control, irrigation, navigation, hydroelectric 
power, and other purposes, with a gross storage 
capacity of 23,337,000 acre-feet at maximum operating 
pool. It contains seven power units rated at 85,000 kilowatts 
each. Federal cost of the project was $346,521,000. 
Construction was initiated August 1948 and project 
placed in operation June 1963. Land acquisition is 99 
percent complete. 
Local cooperation. None required except for recreation 
cost-sharing. 
Operations during fiscal year. Maintenance: Project 
was operated in conjunction with the other Missouri 
River reservoirs for flood control, navigation, power production 
and other multiple purpose uses. Generating facilities 
produced 2,928,971,000 net kilowatt-hours of 
electricity. Installation of a power plant controller system 
on the Missouri River dams continued. Initiated 
work on bank stabilization at the Havens archeological 
site, boundary surveys and monumentation near Mobridge, 
SD, replace cable tunnel oil pipe supports, repair 
left tailrace retaining wall, and rehabilitation of the 
Lake Pocasse spillway channel. Annual project visitation 
hours were estimated at 7,052,216. 
Miscellaneous 
28. NATIONAL EMERGENCY 
PREPAREDNESS 
The total fiscal year cost for this category amounted 
to $280,654.77. 
29. GENERAL INVESTIGATIONS 
Fiscal Year 1987 costs totaled $1,838,902 for all General 
Investigation activities. See Table 21-K which covers 
Surveys, Collection and Study of Basic Data, Research 
and Development, Continuation of Planning and 
Engineering, Planning and Engineering under Proposed 
Program Legislation, and Advance Engineering and Design. 
21-8

TABLE 21-A 
OMAHA, NE, DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total Thru 
in Text Project 
1. Missouri River, 
Sioux City, IA 
to Rulo, NE 
2. Sioux City Marina 
3. Bear Creek Lake, 
CO 
4. Bowman-Haley 
Lake, ND 
5. Chatfield Lake, 
CO 
(Required 
Contributed 
Funds) 
(Consolidated 
Summary) 
6. Cherry Creek 
Lake, CO 
7. Fall River 
Basin, SD 
8. Great Falls, MT 
(Required 
Contributed 
Funds) 
(Consolidated 
Summary) 
1
I
l FY 84 FY 85 FY 86 FY 87 Sep 30, 1987 
2,330,000 1,792,000 
2,306,324 1,814,990 
- 100,000 
- 100,000 
Funding 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
1,660 
1,544,000 
2,018,572 
470,000 
501,369 
332,000 
440,291 
99,000 
112,048 
1,600,000 
889,677 
530,250 
2,130,250 
889,677 
456,000 
451,280 
285,000 
284,444 
831,000 
1,150,517 
296,000 
326,557 
200,000 
1,235,141 
200,000 
1,235,141 
2,47 
2,46 
-2 
-2
26 
27 
17 
17 
60 
1,361 
94 
60 
1,46 
47' 
47 - 
-6[ 
56 
56( 
26( 
254 
-8C 
118 
1,073 
261,000 
258,363 
168,000 
168,693 
2,022,000 
2,573,718 
150,980 
492,748 
2,172,980 
3,066,466 
625,000 
623,240 
-177,023 
373,000 
374,702 
253,000 
260,565 
92,375 
129,600 
221,975 
- 189,225,9911 
- 189,225,9911 
5,000 106,398,419 
4,261 106,383,022 
0,000 80,000 
1,364 78,636 
- 62,003,600 
- 62,003,600 
8,000 1,860,000 
5,403 1,858,599 
- 4,372,174 
- 4,372,174 
5,000 1,845,043 
4,940 1,843,643 
0,000 93,782,700 
9,780 93,664,209 
3,941 1,246,171 
6,498 743,375 
3,941 95,028,871 
6,278 94,407,584 
4,000 3,523,800 
1,710 3,516,539 
5,000 15,220,364 
- 15,216,249 
7,000 5,993,511 
3,993 5,990,039 
- 5,538,432 
- 5,538,432 
3,000 3,331,141 
1,829 3,319,109 
),000 11,937,1124 
x,213 11,864,3974 
- 308,600 
- 308,600 
),000 12,245,7124 
3,213 12,172,9974 
825,000 -80 
563,139 118 
21-9 
~ll~~~"~~l~"~"""~R""""11"1~11~11"1"-~ -11 --- ~ II ~I 1111_1 1n-1., 11 ~-L~.r~-~UI 
17 
227,000 
225,407 
127,000 
126,115 
2,584,000 
1,892,138 
561,000 
154,129 
3,145,000 
2,046,267 
748,000 
752,420 
-53,000 
55,464 
404,000 
402,689 
287,000 
288,506 
825,000 
563,139

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 21-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total Thru 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep 30, 1987 
9. Little Sioux River New Work: 
and Tributaries, IA Approp. 
Cost 
(Required 
Contributed 
Funds) 
(Consolidated 
Summary) 
10. Lost Creek, 
Columbus, NE 
(Required 
Contributed 
Funds) 
(Consolidated 
Summary) 
11. Missouri National 
Recreational River 
NE & SD 
12. Missouri River, 
Kenslers Bend, 
NE, to Sioux 
City, IA 
13. Missouri River, 
Levees, IA, 
NE, KS & MO 
(Required 
Contributed 
Funds) 
(Consolidated 
Summary) 
14. Papillion Creek 
and Tributaries 
Lakes, NE 
16. Pipestem Lake, 
ND 
17. Salt Creek and 
Tributaries, NE 
19. Inspections of 
Completed Local 
Protection Projects 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
1,300,000 3,467,000 
1,291,413 3,288,990 
1,300,000 
1,291,413 
1,367,000 
703,300 
5,000 
1,372,000 
703,300 
6,698 
40,000 
37,996 
495,000 
1,269,792 
495,000 
1,269,792 
3,655,000 
6,943,608 
198,000 
205,100 
3,467,000 
3,288,990 
610,869 
8,345 
619,214 
20,000 
215 
200,000 
32,073 
34,000 
36,231 
1,462,000 
3,076,518 
38,810 
1,462,000 
3,115,328 
2,428,000 
2,524,245 
306,000 
312,244 
310,000 345,000 
375,541 349,945 
10,045 5,302 
457,000 537,000 
444,306 549,826 
311,000 183,000 
276,596 232,834 
176,247 
176,247 
294,000 
547,369 
294,000 
547,369 
136,000 
95,984 
352,000 
511,978 
39,000 
38,585 
287,000 
218,155 
287,000 
218,155 
1,627,000 
1,610,484 
473,000 
469,039 
271,000 
269,506 
213 
390,000 
387,776 
278,000 
277,285 
100,000 
26,511 
6,329 
20,599,920 
20,511,562 
6,329 
106,329 20,606,249 
26,511 20,511,562 
-15,000 3,469,518 
-50,000 3,379,020 
- 147,300 
125,069 147,300 
-15,000 3,616,818 
74,232 3,526,320 
25,000 781,800 
57,516 754,299 
- 552,000 
5,533 549,585 
- 11,294,414 
- 11,294,414 
52,000 4,442,000 
51,304 4,440,254 
120,000 39,909,388 
166,202 39,832,918 
- 38,810 
- 38,810 
120,000 39,948,198 
166,202 39,871,728 
2,270,000 45,887,7625 
2,129,384 45,701,5195 
514,000 2,463,000 
513,416 2,450,089 
- 9,277,545 
- 9,277,545 
351,000 2,994,000 
352,918 2,993,520 
- 12,197,6222 
- 12,197,6222 
946,000 7,652,475 
946,653 7,648,921 
209,000 2,808,348 
209,511 2,808,142 
21-10 
- -~I- I -I--- ------- - --

OMAHA, NE, DISTRICT 
TABLE 21-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project 
19. Inspection of 
Non-Federal Levees 
20. Scheduling Flood 
Control Reservoir 
Operations 
22. Big Bend Dam- 
Lake Sharpe, 
Missouri River 
Basin, SD 
23. Fort Peck Lake, 
MT 
24. Fort Randall 
Dam-Lake Francis 
Case, Missouri 
River Basin, SD 
25. Garrison Dam- 
Lake Sakakawea, 
Missouri River 
Basin, ND 
(Federal Funds) 
(Contributed 
Funds) 
26. Gavins Point 
Dam-Lewis & 
Clark Lake, 
Missouri River 
Basin, SD 
and NE 
27. Oahe Dam-Lake 
Oahe, Missouri 
River Basin, 
SD & ND 
Funding 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab 
Approp. 
Cost 
Major Rehab 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Total Thru 
FY 84 FY 85 FY 86 FY 87 Sep 30, 1987 
46,000 
46,094 
209,000 
208,870 
243,000 
243,000 
3,066,000 
3,396,128 
-22,000 
1,694 
2,391,000 
3,470,461 
455,000 
464,367 
6,379,000 
7,162,997 
287,000 
296,675 
6,083,000 
7,543,117 
130,000 
130,000 
3,699,000 
3,817,338 
737,000 
746,523 
7,723,000 
9,237,595 
44,000 
44,525 
268,000 
269,355 
33,000 
32,979 
3,420,000 
3,482,368 
-4,091 
4,327,000 
4,300,604 
112,000 
114,700 
5,701,000 
5,896,791
6 
9,166,000 
9,179,213 
163,000 
163,000 
3,641,000 
3,602,668 
-308,000 
-307,758 
8,119,000 
8,062,707 
43,000 
43,167 
274,000 
273,069 
-25,000 
-24,979 
3,667,000 
3,642,938 
4,200 
3,399,000 
3,461,784 
311 
6,957,000 
6,925,109 
7,148,000 
7,144,937 
78,000 
78,000 
4,246,000 
4,311,714 
-2,892 
7,149,000 
7,283,549 
334,000 494,000 
325,962 485,846 
279,000 5,089,976 
278,567 5,088,333 
- 107,497,597 
. 107,497,597 
4,861,200 47,439,1743 
4,868,068 47,392,2923 
- 158,428,080 
- 158,428,080 
2,555,400 55,362,9543 
2.535,237 55,312,8323 
- 199,065,883 
- 199,065,883 
6,418,100 86,895,9523 
6,525,664 86,851,3193 
- 295,729,613 
- 295,729,613 
8,332,700 100,254,4003 
8,366,465 100,195,1993 
- 4,208,310 
- 4,208,310 
- 686,961 
- 686,961 
- 49,617,239 
- 49,617,239 
5,307,300 64,600,4503 
5,306,454 64,571,7793 
- 346,520,603 
- 346,517,696 
7,452,300 90,491,4453 
7,395,467 90,370,5863 
1. Includes $18,325,581 National Industrial Recovery 
Act funds, $8,625,718 Emergency Relief Funds, and 
$1,181,125 for previous project. 
2. Includes $123,000 of government cost applicable 
to that portion of the project which is currently being 
carried in a deferred status. 
3. Includes Special Recreation Use Fees. 
4. Includes $110,000 transferred to inactive portion 
for planning cost. 
5. Does not include $1,854,338 cost of inactive sites. 
21-11 
-- - -~-- ' -- I -- -- - -- -- -- ------------------- ---;------ 
- - -----~I-pl---m~--~'~- ~ ~Is II ---" - -- -- - - - - - -- 
SSeeection

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 21-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing Project and Work 
in Text Act Authorized Documents 
1. 
Jan 12, 1927 
July 3, 1930 
Aug 30, 1935 
Mar 2, 1945 
Aug 13, 1968 
Flood Control 
Act of 1962 
Flood Control 
Act of 1950 
Aug 18, 1941 
Dec 22, 1944 
Dec 22, 1944 
Aug 18, 1941 
Flood Control 
Acts of 1955, 1965 
Flood Control 
Act of 1954 
June 30, 1948 
National Parks 
and Recreation 
Act of 1978 
Water Resources 
Development Act 
of 1986 
MISSOURI RIVER, SIOUX CITY, IA TO RULO, NE 
Appropriation of $12 million authorized for H 
securing a 6 foot depth from Quindaro Bend F 
(Kansas City, MO to Sioux City, IA). 
Appropriation of $15 million additional allotments P1 
totaling $29,153,108 made by Public Works P 
Admimnistration under provisions of National 
Industrial Recovery Act of 1933, and $9,669,791 
allotted under provisions of Emergency Relief 
Appropriations Act of 1935. 
For completion of project from mouth to Sioux H 
City, IA. P 
For a channel of 9-foot depth and 300-foot width. 
BEAR CREEK LAKE, CO 
A flood control reservoir for protection of 
metropolitan Denver, CO. 
BOWMAN-HALEY LAKE, ND 
Flood control reservoir and water supply. 
CHATFIELD LAKE, CO 
Flood control reservoir and channel improvements 
to provide downstream protection for Denver, CO. 
CHERRY CREEK LAKE, CO 
Initiation and partial accomplishment of project. 
Completion of plan approved in Act of 
Aug 18, 1941. 
General comprehensive plan, Missouri River Basin. 
FALL RIVER BASIN, SD 
Provide flood control to the town of Hot 
Springs, SD. 
GREAT FALLS, MT 
Levees and channel improvement for local 
protection. 
LITTLE SIOUX RIVER, IA 
Correction of design deficiency. 
LOST CREEK AT COLUMBUS, NE 
Levee and channel improvement for local 
protection - Section 205. 
. Doc. 1120, 60th Cong. 
PL 70-560 
L 71-520 
PL 73-67 
. Doc. 238, 73rd Cong. 
PL 74-409 
H. Doc. 214, 76th Cong. 
PL 79-14 
S. Doc. 87, 90th Cong. 
PL 90-483 
H. Doc. 574, 87th Cong. 
PL 87-874 
H. Doc. 669, 80th Cong. 
PL 81-516 
H. Doc. 426, 76th Cong. 
PL 77-228 
H. Doc. 426, 76th Cong. 
PL 78-534 
H. Doc. 475, and S. Docs. 
191 and 247, 78th Cong. 
PL 78-534 
H. Doc. 655, 76th Cong. 
PL 77-228 
H. Doc. 343, 85th Cong. 
PL 85-500 
PL 89-298 
PL 341, 80th Cong. 
PL 83-780 
PL 858, 80th Cong. 
MISSOURI NATIONAL RECREATIONAL RIVER, NE AND SD 
Preservation and enhancement of the Missouri PL 95-625 
River between the reaches from Gavins Point 
Dam, NE & SD to Ponca State Park, NE. 
Modified 1950 Flood Control Act to operate dam H. Doc. 1013, 99th Cong. 
and other Federal improvements to achieve PL 99-662 
authorized level of protection, beginning at dam 
and ending 82 miles downstream. Reassigns a 
portion of the storage space in the lake project to 
joint flood control-conservation purposes. Modified 
1974 WRDA to exempt prohibition of encroachments 
for Mineral Ave/Ken Caryl Rd. ext & 
transmission line. 
21-12 
3. 
4. 
5. 
6. 
7. 
8. 
9. 
10. 
11. 
- ----- - I -- I--- - I --s U-- -Z1-1-- -- PP----L~--~~-- --~LI-------~~11^------~ --s l -

OMAHA, NE, DISTRICT 
TABLE 21-B (Continued) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing Project and Work 
in Text Act Authorized Documents 
Aug 18, 1941 
June 30, 1948 
Aug 18, 1941 
Dec 22, 1944 
Flood Control 
Act of 1968 
Water Resources 
Development Act 
of 1986 
June 28, 1938 
Aug 18, 1941 
Dec 22, 1944 
July 24, 1946 
May 17, 1950 
Sep 3, 1954 
Sep 3, 1954 
May 2, 1956 
July 3, 1958 
July 14, 1960 
Dec 30, 1963 
June 18, 1965 
May 12, 1967 
MISSOURI RIVER, KENSLERS BEND, NE TO SIOUX CITY, IA 
Construction of dike, revetments. H. Doc. 821, 76th Cong. 
PL 77-228 
PL 80-858 
MISSOURI RIVER LEVEE SYSTEM, IA, NE, KS, AND MO. 
Levees along both sides of river from H. Doc. 821, 76th Cong. 
Sioux City, IA to Kansas City, MO. PL 77-228 
Extended project from Kansas City, MO to mouth H. Doc. 475, 78th Cong. 
and provided for increased protection. PL 78-534 
S. Docs. 191 and 247, 78th 
Cong. 
PAPILLION CREEK AND TRIBUTARIES LAKES, NE 
Series of flood control reservoirs, providing pro- H. Doc. 349, 90th Cong. 
tection for the metropolitan areas of Omaha, NE. PL 90-485 
Authorized additional $4.8 million for channel H. Doc. 1013, 99th Cong. 
improvement on Big Papillion Creek, and to PL 99-662 
Union Pacific RR bridge, rec trail and flood 
warning system. 
PICK-SLOAN MISSOURI BASIN PROGRAM (OMAHA DIST.) 
Adopted general comprehensive plan for Missouri Flood Control Committee 
River Basin and authorized $9 million for Doc. 1, 75th Cong. 
initiation and partial accomplishment. PL 75-761 
Modified general comprehensive plan to include H. Doc. 842, 76th Cong. 
Harlan County Dam and Reservoir on PL 77-228 
Republican River, NE and authorized 
additional $7 million. 
Expanded general comprehensive plan for H. Doc. 475, and S. Does. 
Missouri River Basin and authorized additional and 247, 78th Cong. 
$200 million. PL 78-534 
Authorized additional $150 million for prosecution 
of general comprehensive plan for Missouri 
River Basin. 
Authorized additional $250 million for prosecution 
of general comprehensive plan for Missouri 
River Basin. 
191 
PL 79-526 
PL 81-516 
Expanded general comprehensive plan for Missouri H. Does. 549 and 642, 81st 
River Basin and authorized additional Cong. PL 83-780 
$217,710,000. 
Authorized $5,384,014 to compensate Sioux PL 83-776 
Indians for reservation lands required for Oahe, 
South Dakota project. 
Modified general comprehensive plan for Missouri PL 84-505 
River Basin by deletion of construction of Red 
Willow Dam and Reservoir, NE, and addition of 
construction of Wilson Dam and Reservoir, KS. 
Expanded general comprehensive plan for Missouri H. Doc. 409, 84th Cong. 
River Basin and authorized additional $200 PL 85-500 
million. 
Authorized additional $207 million for prosecution PL 86-645 
of general comprehensive plan for Missouri River 
Basin. 
Authorized additional $80 million for prosecution of PL 88-253 
general comprehensive plan for Missouri River 
Basin and modified the plan to include work protection 
and rectification works below Garrison Dam. 
Authorized additional $116 million for prosecution PL 89-042 
of general comprehensive plan for Missouri River 
Basin. 
Authorized additional $20 million for prosecution PL 90-17 
of general comprehensive plan for Missouri River 
Basin. 
21-13 
12. 
13. 
14. 
15. 
- -- -- -- I ----~-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 21-B (Continued) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing Project and Work 
in Text Act Authorized Documents 
Aug 13, 1968 
June 19, 1970 
Dec 24, 1970 
Dec 31, 1970 
Dec 23, 1971 
Mar 7, 1974 
July 8, 1976 
Nov 16, 1977 
Flood Control 
Act of 27 Oct 1965 
July 3, 1958 
May 17, 1950 
May 12, 1967 
Aug 13, 1968 
June 19, 1970 
Dec 23, 1971 
Mar 7, 1974 
July 8, 1976 
Nov 16, 1977 
Dec 22, 1944 
June 16, 1933 
Aug 30, 1935 
May 18, 1938 
Dec 22, 1944 
June 3, 1948 
Authorized additional $38 million for prosecution PL 
of general comprehensive plan for Missouri River 
Basin. 
Authorized additional $109 million for prosecution H. I 
of general comprehensive plan for Missouri River S. 
Basin. PL 
Changed comprehensive plan name to Pick-Sloan S. E 
Missouri Basin Program. PL 
Oahe Dam and Reservoir, ND. H. I 
PL 
Authorized additional $101 million for prosecution PL 
of Pick-Sloan Missouri Basin Program. 
Authorized additional $72 million for prosecution PL 
of Pick-Sloan Missouri Basin Program. 
Authorized additional $85 million for prosecution PL 
of Pick-Sloan Missouri Basin Program. 
Authorized additional $59 million for prosecution PL 
of Pick-Sloan Missouri Basin Program. 
PIPESTEM LAKE, ND 
Provide flood control for Jamestown, ND and H. I 
downstream areas. PL 
SALT CREEK AND TRIBUTARIES, NE 
Series of dams and channel improvements for flood H. I 
control around Lincoln, NE. PL 
SOUTH PLATTE RIVER BASIN, CO 
Adopted plan of improvement for South Platte H. I 
River Basin and authorized $26.3 million for PL 
initiation and partial accomplishment. 
Authorized additional $2 million for prosecution of plan. 
Authorized additional $12 million for prosecution of plan 
Authorized additional $21 million for prosecution of plan. 
Authorized additional $37 million for prosecution of plan. 
Authorized additional $15 million for prosecution of plan. 
Authorized additional $22 million for prosecution of plan. 
Authorized additional $3 million for prosecution of plan. 
BIG BEND DAM - LAKE SHARPE, SD 
Expanded general comprehensive plan for flood H. I 
control and other purposes in the Missouri 78t 
River Basin. 
90-483 
D)oc. 91-748 and 
Doc. 91-895 
91-282 
)oc. 91-1100, 91st Cong. 
91-576 
D)oc. 91-23 and 
91-611 
92-222 
93-251 
94-347 
95-189 
D)oc. 266, 89th Cong. 
89-298 
D)oc. 396, 84th Cong. 
85-500 
D)oc. 669, 80th Cong. 
81-516
PL 90-17 
PL 90-843 
PL 91-282 
PL 92-222 
PL 93-251 
PL 94-347 
PL 95-189 
D)oc. 475, S. Doc. 247, 
th Cong. PL 78-534 
FORT PECK LAKE, MT 
Construction of earth dam, as recommended by H. Doc. 238, 73rd Cong. 
Chief of Engineers Sep 30, 1933, was approved by PL 74-409 
Executive Order by the President and included in 
Public Works Administration program, Oct 14, 1933 
as authorized by the National Industrial Recovery 
Act of 1933 and adopted by the River and Harbor 
Act of 1935 (PL 74-409). 
Completion, maintenance, and operation of a PL 75-529 
hydroelectric powerplant, subject to certain provisions 
in act respecting transmission and sale of 
electric energy. Also authorizes installation of 
additional power-generating facilities by Secretary 
of War when deemed necessary in judgment of 
Bureau of Reclamation. 
Modified authorization to provide for full multiple H. Doc. 475 and S. Docs. 191 
purpose operation. and 247, 78th Cong. 
PL 78-534 
Payments to be made to school districts serving PL 80-586 
project as reimbursement for educational facilities 
(including transportation to and from school) for 
pupils who are dependents of persons engaged in construction, 
operation, and maintenance of projects. 
21-14 
16. 
17. 
18. 
22. 
23.
-

OMAHA, NE, DISTRICT 
TABLE 21-B (Continued) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing Project and Work 
in Text Act Authorized Documents 
Water Resources Modified authorization to include recreation as a H. Doc. 1013, 99th Cong. 
Development Act project purpose. PL 99-662 
of 1986 
24. FORT RANDALL DAM - LAKE FRANCIS CASE, SD 
Dec 22, 1944 Expanded general comprehensive plan for flood H. Doc. 475 and S. Docs. 191 
control and other purposes in the Missouri and 247, 78th Cong. 
River Basin. PL 78-534 
25. GARRISON DAM - LAKE SAKAKAWEA, ND 
Dec 22, 1944 Expanded general comprehensive plan for flood H. Doc. 475, S. Doc. 247, 
PWA 1968 control and other purposes in the Missouri 78th Cong. PL 78-534 
River Basin. 
26. GAVINS POINT DAM - LEWIS AND CLARK LAKE, NE & SD 
Dec 22, 1944 Expanded general comprehensive plan for flood H. Doc. 475, S. Doc. 247, 
control and other purposes in the Missouri 78th Cong. PL 78-534 
River Basin. 
27. OAHE DAM - LAKE OAHE, SD & ND 
Dec 22, 1944 Expanded general comprehensive plan for flood H. Doc. 475 and S. Docs. 191 
control and other purposes in the Missouri and 247, 78th Cong. 
River Basin. PL 78-534 
TABLE 21-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last 
Full Report Cost to September 30, 1987 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Missouri River, Sioux City, IA to 
Fort Benton, MT Complete 1948 3,123,141 644,863 
Small Navigation Project at 
Sioux City, IA Complete 1970 43,582- 
TABLE 21-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
Full Report Cost to September 30, 1987 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Belle Fourche, Cheyenne River, SD1 Complete 1940 37,410- 
Big Sioux River at Sioux City, IA Complete 1982 7,458,934- 
Blackbird Creek Near Macy, NE 2 Complete 1970 262,479 
Buffalo Creek, 
Meadow Grove, NE 2 Complete 1974 293,016 - 
Buffalo Creek, Scranton, ND 2 Complete 1960 102,980 - 
Cedar Canyon Dam, Rapid City, SD Complete 1960 120,482 
City of Aurora, 
Westerly Creek, CO Complete 1955 150,000 - 
Clarkson, NE, Maple Creek Complete 1967 191,282 - 
Council Bluffs, IA (Act of 1936) Complete 1939 -- 
Council Bluffs, IA (Act of 1944) Complete 1954 2,557,680 
21-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 21-E (Continued) 
Project 
Deadman's Gulch, Sturgis, SD2 
Dry Creek, Hawarden, IA 
Eagle Bay and Fort Yates 
Highway Bridges, N.D. 
Floyd River, Sioux City, IA 
Forsyth, MT 
Frazer-Wolf Point, MT 
Gering Valley, NE 
Glasgow, MT 
Greybull, WY 
Havre, MT 
Herreid, Spring Creek, SD 
Hooper, NE 2 
Ida Grove, IA 2 
Jamestown Reservoir, ND 
Linton, ND2 
Little Papillion Creek, NE 
Loup River, Columbus, NE 2 
Lower Big Sioux River, IA and SD 
Lower Heart River, ND 
Madison, NE, Union and 
Taylor Creeks 2 
Mandan, Heart River, ND 
Marmarth, ND 
McCook Lake, SD 
Miles City, MT 
Missouri River, Aten, NE 
Missouri River, Niobrara, NE 
Mott, ND 
Mud Creek, Broken Bow, NE 2 
Nishnabotna River at 
Hamburg, IA 
Norfolk, NE 
Omaha, NE 
Pierce, NE 
Platte River Near Schuyler, NE 2 
Platte River and Lost Creek, 
Schuyler, NE 
Platte River and Tributaries, NE 
Rapid Creek, Rapid City, SD 
Saco, MT 
Sacred Heart Hospital, 
Yankton, SD 
Sheridan, WY3 
Shields River, 
Near Clyde Park, MT 2 
Sioux Falls, SD 
South Platte River Levees and 
Channel Improvements, Chatfield 
Lake to Ft. Morgan, CO 
Vaughn, MT, Sun River 2 
Waterloo, NE 
West Point, NE 
Yellowstone River, 
W. Glendive, MT 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
Status 
Complete 
Complete 
Active 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Inactive 
Complete 
Complete 
Inactive 
Complete 
Complete 
Complete 
Complete 
Complete 
Inactive 
Complete 
Complete 
Deferred 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Inactive 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Inactive 
Complete 
Complete 
Complete 
Complete 
Cost to September 30, 1987 
For Last 
Full Report 
See Annual 
Report For 
1981 
1964 
1978 
1970 
1950 
1982 
1971 
1939 
1960 
1958 
1954 
1968 
1972 
1950 
1973 
1976 
1973 
1966 
1964 
1967 
1960 
1960 
1958 
1956 
1951 
1945 
1976 
1948 
1971 
1954 
1967 
1948 
1971 
1980 
1958 
1978 
1976 
1951 
1966 
1957 
1971 
1970 
1966 
1960 
Operation and 
Maintenance 
234,839 
676,916 
169,498 
147,627 
578,791 
99,370 
1,000,000 
236,000 
3,400,504 
5,903,640 
296,597 
74,940 
257,398 
1,538,269 
1,004,000 
67,793 
184,380 
2,618,809 
25,747 
5,288,707 
457,582 
237,883 
149,596 
230,294 
5,633 
- 
1. Completed as a Public Works Administration project. 
2. Authorized by Chief of Engineers. 
3. Includes inactive segment. 
21-16 
_ I __ 
Construction 
3,000,000 
400,000 
616,639 
11,556,667 
255,177 
435,000 
5,989,663 
16,832 
248,507 
1,825,881 
50,216 
326,667 
522,344 
3,643,111 
1,000,000 
1,961,173

OMAHA, NE, DISTRICT 
TABLE 21-F OTHER MULTIPLE PURPOSE PROJECTS INCLUDING POWER 
For Last 
Full Report Cost to September 30, 1987 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Gavins Point Dam-Lewis and Clark 
Lake, Relocation of Niobrara, NE Complete 1980 13,516,459 
Springfield, SD Water Intake Active - -- 
Williston, ND Water Intake Complete 1981 988,583 
TABLE 21-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Authority Federal Contributed 
See Annual and Funds Funds 
Project Report For Date Expended Expended 
Billings, MT 1976 Sec. 201, FC Act 1950 75,000 - 
23 Mar 81 
Boulder, CO 
Buffalo, Johnson County 
Diversion Channel, WY 
Castlewood Lake, 
Douglas County, CO 
Davids Creek Lake, IA 
Dayton, WY 
1976 
1961 
1943 
1972 
1956 
1952 
1969 
1973 
1950 
1966 
1962 
1968 
Giles Creek, Elkhorn, NE 
Indian Creek Lake, IA 
Little Nemaha River, 
Nemaha County, NE 
Morrison, Bear Creek, CO 
Redwater River and 
Hay Creek, Bell Fourche, SD 
Shell Creek, NE 
Vermillion River and Tribs, SD 
FC Act 1950 
WRDA of 1986 
17 Oct 86 
FC Act 1950 
WRDA of 1986 
17 Oct 86 
PL 77-228 
WRDA of 1986 
17 Oct 86 
Sec. 203, PL 90-483 
WRDA of 1986 
17 Oct 86 
Sec. 12, PL 93-251 
WRDA of 1974 
5 Aug 77 
Sec. 12, PL 93-251 
WRDA of 1974 
6 Nov 77 
Sec. 12, PL 93-251 
WRDA of 1974 
4 Jan 74 
Sec. 204, PL 89-298 
WRDA of 1986 
17 Oct 86 
Sec. 12, PL 93-251 
WRDA Of 1974 
5 Aug 77 
Sec. 12, PL 93-251 
WRDA of 1974 
4 Jan 74 
Sec. 12, PL 93-251 
WRDA of 1974 
3 Oct 78 
Sec. 12, PL 93-251 
WRDA of 1974 
4 Jan 74 
21-17 
142,666 
135,000 
30,000 
1,000 
71,000 
208,000

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 21-H MISSOURI RIVER LEVEE SYSTEM, SIOUX CITY, IA TO RULO, NE 
(See Section 13 of Text) 
Miles of 
Unit Levee Status 
L627-624 Mosquito Creek Levee 14.2 Complete 1950 
L601 Watkins-Waubonsie Ditch Levees 15.0 Complete 1966 
L594 Pleasant Valley Levee 11.4 Complete 1964 
R580 Nebraska City Levee 0.2 Complete 1950 
L575 Thurman-Hamburg Levee 45.8 Complete 1950 
R573 Otto County Drainage District No. 2 5.9 Complete 1950 
R562 Peru Dike 7.6 Complete 1950 
L561-550 Atchison County Levee District No. 1 41.3 Complete 1952 
R548 Brownville-Nemaha Levee 19.5 Complete 1952 
L536 Mill Creek Levee 13.6 Complete 1952 
R520 Richardson County Drainage Dist. No. 8 6.3 Complete 1960 
R613 Papillion Creek-Platte River Levee 14.0 Complete 1971 
R616 Bellevue-Papillion Creek Levees 4.5 Complete 1987 
L611-614 Mosquito-Keg Creek Levees 22.0 Under Construction 
LL562617,- 5L5602 4, Remedial Studies on Completed Units Studies Complete 
Comprehensive Restudy of Levee System Scheduled to Start 1988 
PICK-SLOAN MISSOURI BASIN PROGRAM 
TABLE 21-I (See Section 15 of Text) 
Estimated Estimated 
Project Federal Cost Non-Federal Cost 
Fort Peck Lake, MT 1 ,2 158,428,000 1,103,000 
Garrison Dam, Lake Sakakawea, ND 1 ,2 299,938,000 1,516,000 
Missouri River Levee System, IA, NE, KS and MO 
(Sioux City, IA to Rulo, NE)1',3 37,911,000 4,600,000 
Oahe Dam-Lake Oahe SD and ND 1 ,2 346,521,000 2,320,000 
Big Bend Dam-Lake Sharpe, SD1,2 107,498,000 302,000 
Fort Randall Dam, Lake Francis Case, SD 1 ,2 199,066,000 1,609,000 
Gavins Point Dam, Lewis & Clark Lake, SD & NE 1 ,2 49,617,000 137,000 
Gavins Point Dam, Lewis & Clark Lake, SD 
& NE-Relocation of Niobrara, NE 2 13,516,000 - 
Omaha, NE 2 5,904,000 362,000 
Council Bluffs, IA 2 2,558,000 146,000 
Missouri River, Garrison Dam to Lake Oahe, ND 1 ,2 9,413,000 270,000 
Cherry Creek Lake, CO 1 ,2 15,220,000 285,000 
1 Details presented on individual report. 2Completed. 3 Active portion of project. 
INSPECTION OF COMPLETED LOCAL PROTECTION PROJECTS 
TABLE 21-J (See Section 19 of Text) 
Location Month Inspected 
Montana 
Glasgow, Milk River Jun 86 
Saco, Beaver Creek Aug 87 
Havre, Milk River Aug 87 
Havre, Scott Coulee-Bull Hook Dam Aug 87 
Clyde Park, Shields River Nov 86 
Three Forks, Lower Madison River Jun 84 
Forsythe, Yellowstone River Apr 87 
West Glendive, Yellowstone River Nov 86 
Vaughn, Sun River Sep 87 
*Yellowstone River, Water Plant, Livingston Sep 85 
21-18

OMAHA, NE, DISTRICT 
INSPECTION OF COMPLETED LOCAL PROTECTION PROJECTS 
TABLE 21-J (Continued) (See Section 19 of Text) 
Location 
*Yellowstone River, Reedpoint Bridge 
*Yellowstone River, Greycliff Bridge 
*Yellowstone River, Springdale Bridge 
*Yellowstone River, Near Miles City 
Water Intake & Sewage Lagoon 
*Yellowstone River, Bank Protection, Billings 
*Yellowstone River, Yellowstone Co. Bridge, Near Billings 
*Yellowstone River, Voges Bridge, Near Big Timber 
*Jefferson River, Willow Creek Bridge, Near Three Forks 
*Jefferson River, Bank Protection, Near Waterloo 
*Big Hole River, Pennington Bridge, Near Twin Bridges 
*Ruby River, Wheatly Bridge, Near Twin Bridges 
*Big Horn River, Two Leggin Bridge, Near Hardin 
*Missouri River, Bank Stabilization, Fort Benton 
Month Inspected 
Inactive 
Nov 86 
Inactive 
Inactive 
Inactive 
Nov 86 
Nov 86 
Feb87 
Feb87 
Feb87 
Feb87 
Inactive 
Nov 86 
Wyoming 
Greybull, Big Horn River 
Sheridan, Big and Little Goose Creeks 
*Shoshone River, Bank Protection, Lovell 
*Shoshone River, Byron 
North Dakota 
Mandan, Lower Heart River 
Marmarth, Little Missouri River 
Scranton, Buffalo 
South Dakota 
Sioux Falls, Big Sioux River 
Belle Fourche, Belle Fourche River 
Rapid City, Cedar Canyon Dam 
Hot Springs, Fall River Channel 
Herreid, Spring Creek 
*Missouri River, Bank Protection, Greenwood 
*Bad River, Bank Protection, Fort Pierre 
*Big Sioux River, Schofield Bridge, Near Flandreau 
*Big Sioux River, Fink Bridge, Near Flandreau 
Rapid Creek, Rapid City 
Sacred Heart Hospital, Yankton 
*Vermillion River, Vermillion 
*Big Sioux River, Harrisburgh 
*Big Sioux River, Jefferson 
Colorado 
Aurora, Westerly Creek-Kelley Road Dam 
*Plum Creek, Bank Stabilization, Aurora 
*Cache La Poudre River, Windsor 
*South Platte River, Kersey 
*South Platte River, Merino 
*South Platte River, Iliff 
*South Platte River, Platteville 
*Big Thompson River, Johnstown 
Cache La Poudre River, Ft. Collins (Water Treatment Plant) 
South Platte River, Adams County, No. Washington St. 
Water and Sanitary District 
Nov 86 
Nov 86 
Nov 86 
Nov 86 
Aug87 
Aug87 
Aug87 
Jul 87 
Aug 86 
Sep 87 
Sep 87 
Sep 85 
Sep 87 
Jun 85 
Apr 87 
Apr87 
Sep 87 
Apr87 
Apr 87 
Apr87 
Apr87 
Jul 87 
Jul 86 
Jul 86 
Jul 86 
Jul 86 
Jul 86 
Jul 86 
Jul86 
Jul 86 
Jul 86 
21-19 
- - - I- I-- Y----- -----~ -~LI

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
INSPECTION OF COMPLETED LOCAL PROTECTION PROJECTS 
TABLE 21-J (Continued) (See Section 19 of Text) 
Location Month Inspected 
Nebraska 
Blackbird Creek, Decatur Sep 87 
Omaha, Missouri River Sep 87 
Waterloo, Elkhorn River May 87 
West Point, Elkhorn River Sep 87 
Pierce, Elkhorn River May 87 
Clarkson, Middle Fork, Maple Creek Jun 87 
Hooper, Elkhorn River Jun 87 
Norfolk, North Fork, Elkhorn River Aug 87 
Madison, Union & Taylor Creeks Jun 87 
*Platte River, M.U.D. Protection, Cedar Island Sep 87 
*Platte River, Bank Protection, Louisville Aug 87 
*Elkhorn River, Q Street Bridge, Near Gretna Sep 87 
*Elkhorn River, Ray Bridge, Near Norfolk Sep 87 
*North Platte River, Bank Stabilization, Minatare Dec 85 
*Logan Creek, Bank Protection, Near Bancroft Sep 87 
*Battle Creek, Bank Protection, Battle Creek Sep 87 
Schuyler, Lost Creek & Platte River May 87 
Little Papillion, Little Papillion Creek Jul87 
Gering Valley, Gering Drain & Tributaries Feb 87 
Macy, Blackbird Creek Jun 87 
Lincoln, Salt Creek & Tributaries Jul87 
Meadow Grove, Buffalo Creek May 87 
Columbus, Loup River Aug 87 
Broken Bow, Mud Creek Aug 87 
*Tangeman, Little Nemaha River Sep 87 
*Julian, Rock Creek Inactive 
*Muddy Creek near Syracuse Jul87 
*Platte River, Hansen-Chris Lakes, Bellevue Aug 87 
*Platte River, Brady Aug 87 
*Elm Creek, Decatur Sep 87 
*Wiggle Creek, Homer Sep 87 
*Elk Creek, Jackson Sep 87 
*South Creek, Martinburg Sep 87 
*Elk Creek, Willis Sep 87 
Columbus Flood Control Project, Lost Creek, Columbus Aug 87 
*Shell Creek, County Road near Columbus Sep 87 
*Middle Pebble Creek, Snyder Sep 87 
*Elm Creek, Burt County Sep 87 
*Redbird Creek, O'Neal Sep 87 
*Salt Creek Sewage Treatment Plant, Lincoln Aug 87 
*Platte River, Ashland Sep 87 
Iowa 
Council Bluffs, Missouri River Jul87 
Ida Grove, Maple River-Odebolt Creek May 87 
Sioux City, Floyd River Jul87 
Hawarden, Dry Creek Jul87 
Hamburg L575, Nishnabotna River Aug 87 
Intercounty D.D., Little Sioux River Sep 87 
Nagel D.D., Little Sioux River Jul87 
Bennett-McDonald-Smithland D.D., Little Sioux River Jun 87 
*West Nishnabotna River, Mills Co. Bridge, Near Malvern Sep 87 
*West Nishnabotna River, Mills Co. Bridge, Near Hastings Sep 87 
*East Nishnabotna River, Page Co. Bridge, Near Essex Aug 87 
*Missouri River, Marina, Sioux City Sep 87 
*West Nishnabotna River, Near Hancock Sep 87 
*East Nishnabotna River, Near Griswold Sep 87 
East Nishnabotna River, Red Oak Jun 87 
21-20

OMAHA, NE, DISTRICT 
INSPECTION OF COMPLETED LOCAL PROTECTION PROJECTS 
TABLE 21-J (Continued) (See Section 19 of Text) 
Location Month Inspected 
Emerson, Indian Creek, Mills County 
*East Fork of Boyer River, Near Vail 
Monona-Harrison Ditch Control, Monona County 
*Little Sioux River, Anthon 
*Big Sioux River, Plymouth County 
Missouri River Levees 
L624 & L627, Mosquito Creek & Sieck Levees 
L601, Watkins Levee District 
L601, Miller-Sturgeon Levee District 
L601, Missouri River Levee District #1 
L594, Waubansie Drainage District 
L594, Pleasant Valley Levee District 
L575, Benton-Washington Levee District 
L575, Northwest Atchison Levee District 
L575, McKissock Island Levee District 
L575, Buchannan Levee District 
L561, L550, L536, Atchison County Levee District 
L611-614, M & P Missouri River Levee District 
R613, Papio Natural Resources District 
R562, Peru Levee District 
R548, Brownville-Nemaha Levee District 
R548, Little Nemaha Levee District 
R520, Richardson Co. Levee Dist. #8 
R573, Otoe County Drainage Dist. #2 
R616, Sarpy County Papio Natural Resources District 
Jul 87 
Sep 87 
Sep 87 
Sep 87 
Apr 87 
Jul 87 
Jul87 
Jun 87 
Jul 87 
Jul 87 
Aug87 
Aug 87 
Aug 87 
Aug87 
Jul87 
Aug 87 
Jun 87 
Sep 87 
Jul 87 
Jul 87 
Jul 87 
Jul 87 
Jun87 
Sep 87 
*Denotes Section 14 Projects 
ACTIVE GENERAL INVESTIGATIONS 
TABLE 21-K (See Section 29 of Text) 
Federal Cost Totals By 
Item FY 87 Categories 
SURVEYS (Category 100) 
Flood Damage Prevention Studies (120) 
Platte River Basin, CO 135,700 
Eastern SD and Upper Big Sioux River, SD, IA 113,699 
Missouri River, SD, NE, ND, MT 557,405 
Western Dakotas Region of SD 2,135 
Subtotal 808,939 
Review of Authorized Projects (160) 
Cannonball River at Mott, ND 25,137 
Salt Creek and Tributaries, NE 110,616 
Deauthorization Review Program 6,065 
Subtotal 141,818 
Miscellaneous Activities (170) 
Special Investigations 97,461 
FERC Licensing 1,987 
Subtotal 99,448 
21-21 
-- ---- I- --~ - -~- - ------ ~- --- - - -I

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
ACTIVE GENERAL INVESTIGATIONS 
TABLE 21-K (Continued) (See Section 29 of Text) 
Federal Cost Totals By 
Item FY 87 Categories 
Coordination Studies with Other Agencies (180) 
Soil Conservation Service, Dept. Agric. (181) 4,349 
Bureau of Reclamation, Dept. Interior (182) 14,983 
Missouri River Basin Commission (183) 2,518 
Planning Assistance to States (186) 70,397 
Technical Assistance for Streambank Erosion (188) 13,817 
Subtotal 106,064 
TOTAL (Category 100) 1,156,269 
COLLECTION AND STUDY OF BASIC DATA (Category 200) 
Flood Plain Management Services (250) 184,511 
Hydrologic Studies (260) 34,732 
TOTAL (Category 200) 219,243 
RESEARCH AND DEVELOPMENT (Category 300) 
None 
CONTINUATION OF PLANNING AND ENGINEERING (Category 400) 
Perry Creek, IA (450) 213,848 
Westerly Creek, CO (450) 90,758 
Gregory County Hydroelectric Pumped Storage Facility (460) 3,612 
TOTAL (Category 400) 308,218 
PLANNING AND ENGINEERING UNDER PROPOSED 
LEGISLATION (Category 500) 
None 
ADVANCE ENGINEERING AND DESIGN (Category 600) 
Westerly Creek, CO (650) 155,172 
TOTAL (Category 600) 155,172 
GRAND TOTAL GENERAL INVESTIGATIONS 1,838,902 
FLOOD CONTROL ACTIVITIES UNDER SPECIAL AUTHORIZATION 
TABLE 21-L (See Section 21 of Text) 
Fiscal Year 
Project Name Stage Cost 
Flood Control and Coastal Emergencies 
Disaster Preparedness - 300,645 
Flood Flight and Rescue Operations - 40,393 
Rehabilitation - 112,638 
Advance Measures - 9,812 
Section 205: 
Beaverhead River, Twin Bridges, MT R 20,180 
Belfield, ND R 7,476 
Cache La Poudre River, Greeley, CO R 17,655 
Carter Lake, NE R 3,152 
Dry Creek, Linday, NE R 24,940 
Elkhorn River Crowell, NE R 3,730 
Lodge Creek, Chinook, MT R 3,253 
Lodge Pole Creek, Sidney, NE P 109,482 
Lost Creek at Columbus, NE C -50,864 
Lower Heart River, Mandan, ND D 24,576 
Maple Creek, East Fork, Howells, NE R 25,448 
21-22

OMAHA, NE, DISTRICT 
FLOOD CONTROL ACTIVITIES UNDER SPECIAL AUTHORIZATION 
TABLE 21-L (Continued) (See Section 21 of Text) 
Fiscal Year 
Project Name Stage Cost 
Milk River, Malta, MT R 3,325 
Nowood River, Manderson, WY R 4,844 
Pebble Creek Scribner, NE P 114,706 
Platte River Cedar Creek, NE R 2,550 
Square Butte Creek, Center, NE R 3,905 
Thirty Mile Creek, Harlem, MT R 3,319 
Verdigre Creek, Verdigre, NE R 20,836 
5 Negative Appraisals 28,085 
Total (Section 205) 370,598 
Section 14: 
Battle Creek, Blaine Co, MT, (Unruh Bridge) R 6,895 
Big Sioux River Harrisburg, SD C 38,505 
Big Sioux River, IA (Sec 32) C 23,288 
Big Sioux River, Plymouth, IA (Sec 4) C -17 
Blackbird Creek, Burt Co, NE C 21,815 
Cache La Poudre River, Windsor, CO C 102 
Cr Bridge Elm Creek Decatur, NE C 569 
Elk Creek, Jackson, NE C 980 
Elk Creek, Willis, NE C 28,605 
Elm Creek, Burt Co, NE C 825 
Elm Creek, Decatur, NE (Broadway St. Bridge) C 87 
Elm Creek, Burt Co, NE (Sec 15) C 253 
Elm Creek, Burt Co, NE (Sec 16) C 391 
Hauser Lake, MT P 18,049 
Hudson, WY (City Wells) R 4,000 
James River, Yankton, SD P 15,631 
Knife River, Stanton, ND R 7,500 
Little Sioux River, Anthon, IA C 43,125 
Logan Creek, Bancroft, NE C 7,313 
Lovell, WY (Sewage Lagoons) R 3,649 
Madison River, Madison, MT (Hwy 287) R 7,474 
Marne Creek, Yankton, SD C 134,779 
Medicine Bow River, Elk Mountain, WY C 30,252 
Milk River, Blaine Co, MT (FInley Bridge) R 6,988 
Milk River, Blaine Co, MT (Zurich Bridge) R 6,666 
Milk River, Malta, MT (Sewerline) R 6,914 
Muckey Creek, Mapleton, IA C 12,588 
Muddy Creek, Syracuse, NE C 14,604 
Muddy Creek, Syracuse, NE (Jobs Bill) C 14,029 
Niobrara River, Bassett, NE (Carnes Bridge) C 7,928 
Platte River, Brady, NE C 614 
Platte River, Camp Ashland, NE C 125,440 
Platte River, North Bend, NE P 17,008 
Platte River, Ginger Cove Lagoon, NE P 6,961 
Redbird Creek, Holt Co., NE C 875 
Salt Creek, Lincoln, NE C 717 
Soldier River, Ute, IA P 12,236 
South Creek, Martinsburg, NE (Sites 1 & 2) C 21,894 
South Platte River, Fort Lupton, CO C 32,553 
South Platte River, Iliff, CO C 473 
South Platte River, Kersey, CO C 173 
South Platte River, Merino, CO C 716 
South Platte River, Morgan Co, CO C 124,798 
South Platte River, Platteville, NE C 316 
South Platte River, Weldona, CO C 39,368 
Vermillion River, Vermillion, SD C 3,459 
Vermillion River, Vermillion, SD (Waste Water Treat. Plant) C 2,102 
Waterman Creek, O'Brien Co, IA P 11,425 
21-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
FLOOD CONTROL ACTIVITIES UNDER SPECIAL AUTHORIZATION 
TABLE 21-L (Continued) (See Section 21 of Text) 
Fiscal Year 
Project Name Stage Cost 
West Nishnabotna, River, Oakland, IA P 8,851 
West Papillion Creek, Douglas, Co, NE C 49,344 
Wigle Creek, Homer, NE C 780 
Yellowstone River, MT C 78 
Yellowstone River, MT (Hwy 1-90) R 6,954 
26 Negative Appraisals 138,589 
Total (Section 14) 1,069,511 
Total Flood Control Activities 1,903,597 
R = Recon 
D =Detailed Project Study 
P = Plans & Specs 
C =Construction 
- =Does Not Apply 
21-24 
-1-11-11-11 ~--~l~-UI--"ll-~ll-II ~II 111 - 111111 1111 --- 1 - 1 11 -1-111 1 I-----Y -~-----Y-----YYIII

OHIO RIVER * 
For actual construction of locks and dams, and operation 
and care of completed stuctures, river is divided into 
three sections under immediate supervision and direction 
of District Engineers at Pittsburgh, Huntington and 
Louisville. Pittsburgh section extends 127 miles from 
head of river at Pittsburgh, Pa., to a point immediately 
upstream from New Martinsville, W. Va., and includes 
Emsworth, Dashields, Montgomery, New Cumberland, 
Pike Island and Hannibal locks and dam. Huntington 
section extends 311 miles from mile 127 to 438 
immediately upstream from Foster, Ky., and includes 
Willow Island, Belleville, Racine, Gallipolis, Greenup and 
Captain Anthony Meldahl locks and dams. Louisville section 
extends 543 miles from mile 438 to mouth of river, 
and includes Markland and McAlpine locks and dams 
(with Louisville and Portland Canal) Cannelton, 
Newburgh, Uniontown, and Smithland locks and dams 
and Locks and Dams 52 and 53. 
IMPROVEMENTS 
Navigation 
1. Construction of locks and dams on Ohio 
River ................................. 22-1 
2. Open channel work, Ohio River............ 22-3 
Tables 
Table 22-A Cost and Financial Statement..... 22-5 
Table 22-B Authorizing Legislation........... 22-6 
Table 22-C Not Applicable 
Table 22-D Not Applicable 
Table 22-E Not Applicable 
Navigation 
1. CONSTRUCTION OF LOCKS AND 
DAMS ON OHIO RIVER 
Location. Ohio River is formed by junction of 
Allegheny and Monongahela rivers at Pittsburgh, Pa., 
and flows generally southwesterly for 981 miles to join 
Mississippi River near Cairo, Ill. For description of river 
see page 1227, 1932 Annual Report. 
Previous projects. For details see page 1907 of Annual 
Report for 1915. 
Existing project. Provides for improvement of entire 
river by construction of locks and dams to provide a 
channel depth of 9 feet and for widening Louisville and 
Portland Canal at Louisville, Ky. Project provides for a 
lock with usable dimensions of 110 by 600 feet at each 
of the dams and, in addition, an auxiliary lock 56 by 360 
feet is available at Emsworth, Dashields, Montgomery, 
and McAlpine locks and dams with an auxiliary lock at 
Gallipolis being 110 by 360 feet. Dashields is a fixed dam, 
while Emsworth, Montgomery, and Gallipolis are fixed 
dams with movable crests. Remaining dams are movable 
Table 22-F 
Table 22-G 
Table 22-H 
Table 22-I 
Table 22-J 
Not Applicable 
Not Applicable 
Construction of Locks and Dams on 
Ohio River, Total Cost of Existing 
Project .......................... 22-6 
Federal Energy Regulatory 
Commission Licenses of Locks 
and Dams, Ohio River ............. 22-6 
Ohio River Locks and Dams 
Statistics ........................ 22-7 
type, with navigable pass varying in width from 600 to 
1,248 feet. In addition to navigable pass, movable-type 
dams are also provided with one or more regulating weirs. 
At McAlpine Locks and Dam, a canal (Louisville and 
Portland) extends along left bank for 2 miles, with locks 
at lower end. Modifications to existing project under purview 
of Section 6, March 3, 1909 Act, provide for fixed 
dams with movable crests with two locks (110 by 1200 
feet and 110 by 600 feet) at New Cumberland, Pike Island, 
Hannibal, Willow Island, Belleville, Racine, Greenup, 
Captain Anthony Meldahl, Markland, Cannelton, 
Newburgh, and Uniontown; two locks 110 by 1200 feet 
at Smithland; 110 by 1,200 foot temporary locks in addition 
to the existing locks at Locks and Dams 52 and 53, 
and reconstruction to provide a 110 by 1200-foot lock in 
addition to existing locks and a fixed dam with two sections 
of movable crest at McAlpine Locks and Dam; 
widening Louisville and Portland Canal to 500 feet. Auxiliary 
lock 56 by 360 feet at McAlpine Locks and Dam 
has been inoperative since failure of downstream lock 
gates in December 1972. Rehabilitation of existing Locks 
and Dams 52 and 53 was started in September 1979 under 
the purview of Section 6, March 1909 Act. Mound City 
was also considered authorized under purview of 1909 
22-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Act, and preconstruction planning was performed in the 
period 1965 to 1972. The ruling of the U.S. District Court, 
District of Columbia, on September 6, 1974, with 
reference to Lock and Dam 26, Mississippi River, would 
also apply to this project. Consequently, it is no longer 
considered authorized. Operation and care of locks and 
dams were included in project July 1, 1935, under provisions 
of Permanent Appropriations Repeal Act of June 26, 
1934. Estimated Federal cost of new work (existing project, 
1983), exclusive of Gallipolis Locks and Dam reported 
under Kanawha River project is $1,778,840,999, 
estimated non-Federal cost is $14,999,000. Foregoing 
estimate does not include expenditures on previous projects. 
Various items previously included in this project are 
considered inactive or unnecessary and are excluded from 
foregoing cost estimate. See page 693, Annual Report, 
1968 for items and estimated cost. Under authority of 
1910 River and Harbor Act, Louisville and Portland 
Canal was widened to 200 feet; Locks and Dams 40 and 
42 eliminated; Locks and Dams 1 and 2 replaced by 
Emsworth Locks and Dam; Lock and Dam 3 replaced by 
Dashields Locks and Dam; and Locks and Dams 4, 5, and 
6 replaced by Montgomery Locks and Dam. Locks and 
Dams 24, 25, and 26 were replaced by Gallipolis Locks 
and Dam authorized by August 30, 1935 Act, and constructed 
under project for improving lower Kanawha 
River. Locks and Dams 7, 8, and 9 were replaced by New 
Cumberland Locks and Dam; Locks and Dams 10 and 11 
were replaced by Pike Island Locks and Dam; Locks and 
Dams 12, 13, and 14 were replaced by Hannibal Locks 
and Dam; Locks and Dams 15, 16, and 17 were replaced 
by Willow Island Locks and Dam; Locks and Dams 18, 
19, and 20 were replaced by Belleville Locks and Dam; 
Locks and Dams 21, 22, and 23 were replaced by Racine 
Locks and Dam; Locks and Dams 27, 28, 29, and 30 were 
replaced by Greenup Locks and Dam; Locks and Dams 
31, 32, 33, and 34 were replaced by Captain Anthony 
Meldahl Locks and Dam; Locks and Dams 35, 36, 37, 38, 
and 39 were replaced by Markland Locks and Dam; the 
Louisville and Portland Canal at McAlpine Locks and 
Dam was widened to 500 feet. Locks and Dams 43, 44, 
and 45 were replaced by Cannelton Locks and Dam; Locks 
and Dams 46 and 47 were replaced by Newburgh Locks 
and Dam; Locks and Dams 48 and 49 were replaced by 
Uniontown Locks and Dam, presently under construction; 
and Locks and Dams 50 and 51 were replaced by 
Smithland Locks and Dam, presently under construction, 
as modifications to existing project under purview of 
Section 6, March 3, 1909 Act, reducing total number of 
structures to 20. The Water Resources Development Act 
of 1974 combined the Newburgh Bank Protection Works 
project with the Newburgh Locks and Dam project. A 
December 1981 Act established the Falls of the Ohio 
National Wildlife Conservation Area near McAlpine 
Locks and Dam to protect and preserve existing fossilized 
coral and a diversity of wildlife. Table 22-J contains data 
relative to various features of locks and dams included 
in existing projects. For list of principal towns and cities 
along Ohio River with their mileage below Pittsburgh, 
PA, see page 1060, 1962 Annual Report. See Table 21-I 
for licenses. 
Navigation system of 21 locks and dams is in operation 
and 9-foot navigation throughout length of river is 
generally available at all times. At certain unstable bars 
project depth is maintained by dredging, supplemented 
by contraction works. (See "Open Channel Work, Ohio 
River.") Table 22-J shows cost and year completion of 
locks and dams now in operation. Existing project does 
not provide adequate facilities for present day navigation 
due to obsolescence of structures. Since repair and modernization 
of these facilities would be extremely costly, 
replacement and reconstruction is being accomplished as 
rapidly as funds are made available for the purpose. Construction 
of lock and dam replacement program was 
initiated in fiscal year 1955. New Cumberland, Pike 
Island, Hannibal, Willow Island, Belleville, Racine, 
Greenup, Captain Anthony Meldahl, Markland, 
McAlpine, Cannelton, Newburgh, Uniontown, and 
Smithland replacement locks and dams are in operation, 
replacing 39 old low-lift locks and dams. For total cost of 
existing project, see Table 22-H. 
Terminal facilities. Modern public terminals, with 
warehouses, equipped with operating machinery for 
transferring materials, have been constructed by private 
interests at some of the larger cities and towns. A list of 
terminals on Ohio River is revised annually and can be 
obtained from Division Engineer, U.S. Army Engineer 
Division, Ohio River, Cincinnati, Ohio. 
Operations during fiscal year. New work by contract 
and hired labor: 
Emsworth Locks and Dam (Rehabilitation): Upper lock 
miter gates, 110-foot chamber, were installed by hired 
labor in October 1981. Contract for Locks and Dams 
Rehabilitation, awarded October 15, 1981, was completed 
on November 9, 1984. Dam work included: placing stone 
erosion protection downstream of both back channel and 
main channel, structurally rehabilitating all 14 dam 
gates, painting of the service bridge on main channel dam 
and painting dam gates on the back channel. Lock work 
included: rehabilitation of the river chamber and land 
chamber including all lock machinery. Contract for 
modernizing electrical system of main and back channel 
dams, awarded August 6, 1984 for $1,543,000 was completed 
on June 27, 1986. Contract for scour protection 
repairs, gate bay #4, was awarded on November 16, 1984 
for $347,870 and completed on February 21, 1985. Contract 
for shotcrete repairs consisting of placing shotcrete 
coating, repairing damaged areas with reinforced shotcrete 
and repairing monolith joints on the lock walls with 
reinforced shotcrete, awarded on February 28, 1985, for 
$377,830 was completed on August 9, 1985. Contract for 
miscellaneous painting and sealing concrete surfaces, 
awarded April 17, 1985 for $289,270 was completed 
February 9, 1987. Expenditures during FY 1987 for real 
estate acquisition and coordination, construction, and 
engineering and design of remaining project was 
$123,,815. 
Montgomery Locks and Dam (Rehabilitation): Contracts 
completed include: Fabrication of lock miter gates, 
110-foot chamber for $1,049,132; upper guard wall cells 
for $856,468; emergency dam bulkheads for $329,631; 
fabrication of 56-foot lock miter gates for $344,519. Contract 
for installation of 56-foot lock miter gates and major 
rehabilitation of locks and dam, awarded on July 29, 
22-2

OHIO RIVER 
1985 for $22,193,960 is 81 percent complete. Installation 
of 110-foot lock miter gates completed by hired labor. 
Overall scheduled completion date is March 1989. Expenditures 
during FY 1987 for real estate coordination, construction, 
engineering and design of remaining project 
was $9,431,588. 
Willow Island Locks and Dam: Construction was initiated 
in January 1967. All work is complete. 
Belleville Locks and Dam: Construction was initiated 
in May 1962. All work is complete. 
Racine Locks and Dam: Construction initiated in June 
1964 is complete. 
Gallipolis Lock and Dam: The existing project, constructed 
under project for improving lower Kanawha 
River, was placed in operation in August 1937. The 
dimensions of the existing locks chambers and poor approach 
conditions, particularly to downstream traffic, 
have created a higher than normal accident rate to the 
structure with corresponding hazards and delays to traffic. 
The Water Resources Development Act of 1976 
authorized Phase I studies for a single 1200-foot lock in 
a bypass canal. These studies are complete. 
Initial Construction, General funds for the continuation 
of Engineering activities were received in September 
1985. During the fiscal year real estate acquisition continued. 
Plans and Specifications were completed. The project 
was advertised and bids were opened in September 
1987. The contract is scheduled for award in October 1987. 
The total estimated cost of the project is $336,000,000, 
which is 50 percent federal cost and 50 percent inland 
waterways trust fund cost. 
Greenup Locks and Dam: Construction was initiated in 
October 1954. All work is complete. 
Captain Anthony Meldahl Locks and Dam: Construction 
work complete. 
Markland Locks and Dam: Project is complete including 
a public highway bridge across the navigation structure, 
as authorized by the Federal-Aid Highway Act of 1970 
(Public Law 91-606). For details of bridge see page 22-3 
of Annual Report for 1978. 
Falls of the Ohio National Wildlife Conservation Area 
was authorized by Public Law 97-137 on December 29, 
1981. The Conservation Area will protect 1,000 acres 
which consists of birdlife and-other wildlife. Planning, 
consisted of efforts to locate a Non-Federal sponsor to help 
cost share project accomplishments. Real Estates activities 
consisted of acquisition procedures against forty 
of the fifty tracts needed for the projects: $71,357. 
McAlpine Locks and Dam: Project is complete except 
for alteration of lift section of railroad bridge that spans 
the upper end of the Louisville and Portland Canal which 
work is presently deferred. 
Cannelton Locks and Dam: Project is complete except 
for continuing action on Declarations of Taking on one 
tract. $26,848. 
Newburgh Locks and Dam: Project is complete except 
for continuing action on Declarations of Taking on one 
tract. $3,173. 
Uniontown Locks and Dam: Project is complete except 
for continuing action on Declarations of Taking on one 
tract. $1,990. 
Smithland Locks and Dam: All major construction 
features are complete and the project was advanced to 99 
percent completion. Land acquisition is complete except 
for purchasing of two mineral tracts at one recreation site. 
One relocation contract for electric lines is being delayed 
for rights-of-way problems. 
Contracts for recreational sites at Blackburn, KY, Site 
8 and Birdsville, KY, Site 2 were completed. Contracts 
for recreational sites at Lusk Creek, IL, Site 4, and 
Caseyville, KY, Site 8A were advanced to 99 percent and 
84 percent completion, respectively. A contract for paving 
over demolition was completed. Engineering and 
Design of remaining projects features was continued. 
$968,965. 
Locks and Dam No. 52 (New Lock): Construction initiated 
in December 1967 is complete. 
Locks and Dam No. 53 (Temporary Lock): Construction 
initiated in December 1972 is complete. 
Locks and Dam No. 52 (Rehabilitation): Project is complete. 
A contract to repair the beartrap piers and dam sill 
was awarded in July 1985 and advanced to completion. 
A contract to repair miter gates and piston was advanced 
to completion. Engineering and design of remaining 
project features was completed: $131,218. 
Locks and Dam No. 53 (Rehabilitation): Project is 99 
percent complete. A contract to reinforce and grout beartrap 
piers and install piston rods was awarded in August 
1985 and advanced to completion. A contract to construct 
a stone dike was awarded in August 1986 and advanced 
to completion. A contract to modify electrical wiring at 
1200-foot locks was awarded 20 May 1987 and advanced 
to 67 percent completion. Wicket assemblies were installed 
with hired labor: $278,887. 
Operation and maintenance, general. Locks and dams 
operated as required and necessary repairs and improvements 
made thereto and to operator's quarters, 
grounds and esplanades. Cost were $9,777,666 for Pittsburgh 
District, $12,051,903 for Huntington District and 
$10,950,507 for Louisville District. 
Dashields Locks and Dam (Rehabilitation): Feature 
Design Memorandum for Major Rehabilitation of Locks 
and Dam was completed on September 17, 1985. Contract 
for installation of mooring cells, awarded May 29, 1986, 
for $474,320 was completed on May 6, 1987. Contract for 
Rehabilitation of Locks and Dam was awarded on 
September 17, 1987 for $25,918,504. Overall scheduled 
completion date is March 1990. Expenditures during FY 
1987 for construction and engineering and design for 
rehabilitation project was $1,578,959. 
2. OPEN CHANNEL WORK, OHIO RIVER 
Location. Under jurisdiction of district engineer in 
whose district the work is located. Portion of river included 
in project extends 974.7 miles from head of river at 
Pittsburgh, PA, to mouth of Cache River (Mound City, 
IL). Open channel improvement from mouth of Cache 
22-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
River to mouth of Ohio River is under jurisdiction of 
Mississippi River Commission. 
Existing projects. Before completion of canalization 
project, no project depth had been fixed by Congress under 
project for open channel work, but in order to properly 
aid packet and barge navigation it was necessary to 
secure a low-water channel with a minimum depth of 
4 to 6 feet, and a width, depending upon difficulty 
of running channel, of 400-600 feet; also to permit 
movemment of large coal tows, which movement occurred 
at stages of water exceeding 10 feet, it was necessary 
to remove points of projecting bars which formed at 
various locations along river. Accomplishment of this purpose 
involved concentration of current by closing back 
channels at islands with low dams, contraction and 
straightening wide open channels by low dikes, dredging 
bars and shoals, and removal of snags and wrecks. 
Incidental to direct improvement of Ohio River is construction 
and maintenance of ice piers as required for protection 
of river craft. Stage of extreme high water on Ohio 
River varies from 46 feet at Pittsburgh, Pa., to 80 feet 
at Cincinnati, Ohio, with 57.2 feet at Louisville, Ky. (head 
of falls), 53.8 feet at Evansville, Ind., and 59.5 feet at 
Cairo, Ill. (mouth of river). Estimated cost of new work 
(1960) is $16,160,000, exclusive of following items which 
are considered inactive: Ice piers authorized by 1927 River 
and Harbor Act; reforestation of sloughs on Kentucky 
Peninsula near Evansville, Ind., authorized by 1930 River 
and Harbor Act; dredging to widen channel at certain 
points; and placing revetment at various points. 
Estimated cost of these items (1954) is $6,565,000. Operation 
of snag boats on Ohio River below Pennsylvania 
State line was included in project July 1, 1935, under provisions 
of Permanent Appropriations Repeal Act of 
June 26, 1934. See Table 22-B for authorizing legislation. 
New work under this project is substantially complete, 
since it is not anticipated that work on inactive portion 
of project will be accomplished. In addition to dredging, 
local stabilization of channel has been effected at various 
points by construction of dikes and revetment. Work 
which remains consists of dredging to widen channels at 
certain points to project depth. 
Local cooperation. River and Harbor Act of 
January 21, 1927 authorizing construction of ice piers for 
general open channel work, imposes condition that before 
work is begun on any pier, local interests convey to the 
United States free of cost such riparian rights as may be 
deemed necessary in connection with the improvements 
at locality (H. Doc. 187, 67th Congr., 2nd sess.). Existing 
ice piers are adequate for present purposes and local 
cooperation is not needed since no additional construction 
is under consideration. River and Harbor Act of July 3, 
1930, provides for reforestation of sloughs of Kentucky 
Peninsula and bank protection and that no expense shall 
be incurred by the United States for acquiring lands 
required for purpose of this improvement (H. Doc. 409, 
69th Cong. 1st sess.). However, since no serious overbank 
erosion has occurred since bank revetment in 1933-34, 
reforestation is not considered justifiable at this time and 
no local cooperation is required. 
Operations during fiscal year. Operation and 
maintenance, general: Dredging was done where required 
to provide an adequate and dependable channel of project 
depth at minimum pool conditions. Dikes and 
revetments were maintained and routine work of maintaining 
navigation aids, removing snags, making channel 
studies, hydrographic surveys and mapping was performed 
as required. Channel soundings, hydrographic surveys, 
stream gaging operations, channel inspections and aids 
to navigation, and miscellaneous inspections and reports 
cost $1,380,275. There was no dredging by hired labor on 
the Ohio River in FY 87. Dredging by contract: Huntington 
District 777,847 cubic yards at $1,856,811 and 
Louisville District 1,029,381 cubic yards at $1,847,109. 
22-4

OHIO RIVER 
TABLE 22-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep 30, 1987 
1. Construction of New Work 
Locks and Dams Approp. $1,801,200 $1,814,000 $7,065,000 $5,479,000 $1,396,198,7721 3 5s o1107 21 
on Ohio River Cost 2,573,878 2,518,511 6,639,783 4,974,653 1,394,326,3951 3 6 11 12 15 16 18 21 
Maint. 
Approp. 30,976,373 31,056,817 32,293,874 33,309,500 622,952,3342 4 19 
Cost 30,961,371 33,742,851 32,804,809 32,780,076 621,866,7102 13 14 19 20 
Rehab. 
Approp. 10,189,000 4,605,000 10,151,000 12,486,000 80,001,572 
Cost 7,502,809 6,484,902 12,571,165 9,965,508 76,604,069 
Rehab.(O&M) 
Approp. - - 1,267,100 1,784,400 3,051,500 
Cost - - 1,166,100 1,578,959 2,745,059 
2. Open Channel New Work 
Work, Ohio River Approp. - - - - 15,962,2609 
Cost - - - - 15,962,2608 
Maint. 
Approp. 5,265,000 5,029,763 4,508,800 3,860,500 112,477,726"9 
Cost 4,479,208 5,799,647 4,555,393 3,854,324 112,449,1567 9 
Rehab. 
Approp. - - - - 944,649 
Cost - - - - 944,649 
1 Includes $17,003,761 for previous 6-foot canalization 
project. 
2 Includes $36,943,217 expended from 1885 to 1937 on operation 
and care of work of improvement under provisions of permanent 
indefinite appropriations for such purposes. 
$ Includes $215,812 public works acceleration, executive 
1963. 
4 Includes $38,766 public works acceleration, executive 1963. 
s Excludes $251,769 contributed funds for new work. 
8 Excludes $250,102 contributed funds for new work. 
' Excludes $1,621,349 expended in operation of snag boats 
under provisions of permanent indefinite appropriation for such 
purposes, and $267 transferred to project without 
reimbursement. 
8 Includes $1,040,236 Public Works funds. 
s Includes $1,000 for removal of obstructions in Licking River 
under authority of Section 3, R&H Act of 1930. 
10 Includes $100,000 placed in FY 1971 Budget Reserve. 
11 Excludes $3,899 transferred from project without 
reimbursement. 
12 Surplus property valued at $3,553 transferred to project 
without reimbursement. 
13 Excludes $2,140 transferred to project without 
reimbursement. 
14 Excludes surplus property valued at $73,832 transferred 
to project without reimbursement. 
15 Includes $87,724,158 prior construction cost. 
16 Excludes surplus property valued at $297,385 transferred 
to project without reimbursement. 
"1 Includes $549,392 Code 710 Funds, $572,162 Code 711 
Funds, $532,677 Code 712 Funds and $1,759,812 Code 713 
Funds. 
' Includes $549,392 Code 710 Funds, $342,162 Code 711 
Funds, $532,677 Code 712 Funds and $1,989,812 Code 713 
Funds. 
19 Includes $2,158,073 Funds provided from The Productive 
Employment Appropriations Act of 1983 (PL 98-8). 
20so Includes $920,945 cost for operations and care of previous 
projects. 
21 Includes $4,250,000 Inland Waterways Trust Funds. 
22-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 22-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
In Text Act Project and Work Authorized Documents 
2. Open Channel Work, Ohio River 
March 3, 1827 Project adopted by this act originally covered entire 
length of Ohio River from its mouth near Cairo to 
Pittsburgh, a distance of 981 miles. It provided for 
removal of all obstructions which tend to endanger 
steamboat navigation. 
January 21, 1927 Construct ice piers as a part of project, with funds H. Doc. 187, 67th Cong., 2nd sess. 
allotted from appropriations for general open 
channel work. 
July 3, 1930 Reforestation of sloughs on Kentucky Peninsula near H. Doc., 409, 69th Cong., 1st sess. 
Evansville, Ind., and a 200-foot strip along bank 
and for bank protection, at an estimated cost of 
$200,000. 
July 3, 1958 Act of March 3, 1827 modified to include maintenance H. Doc., 434, 84th Cong., 2nd sess. 
of existing Licking River Channel within lower 
3-mile limit of River slack water, at an estimated 
increase of $1,000 in cost of average annual 
maintenance. 
Locks and Dams, Ohio River 
December 29, 1981 Act of December 29, 1981 established the 1,000 H.R. 2241, PL 97-137, Title II, 
acre Falls of the Ohio National Wildlife Conser- 95 Stat. 1710 
vation Area, at a cost not to exceed $300,000. 
CONSTRUCTION OF LOCKS AND DAMS ON OHIO RIVER 
TOTAL COST OF EXISTING PROJECT TO SEPTEMBER 30, 1987 
TABLE 22-H (See Section 1 of Text) 
Operations and 
Maintenance 
Funds New Work General Rehabilitation Total 
Regular $1,301,929,220 $580,904,993 $79,349,128 $1,962,183,341 
Public Works 3,258,368 0 0 3,258,368 
Emergency Relief 1,198,837 19,000 - 1,217,837 
Maintenance & Operation - 3,039,789 - 3,039,789 
Public Works Acceleration 215,812 38,766 -254,578 
Executive 1963 0 
Total 1,306,602,2373 584,002,548"' 279,349,1284 1,969,953,913 
1 Excludes $36,943,217 expended from 1885 to 1937 under 4 Includes $2,745,059 cost for O&M Rehabilitation. 
permanent indefinite appropriation. 
2 Excludes $920,945 cost for operation and care of previous Note: All other cost variations are listed in the Footnotes 
projects. of Table 22-A. 
3 Excludes $87,724,158 prior construction cost. 
FEDERAL ENERGY REGULATORY COMMISSION LICENSES 
TABLE 22-I AT LOCKS AND DAMS, OHIO RIVER 
Markland Dam McAlpine Dam Racine Dam Greenup Dam 
F.E.R.C. License 2,211 289:1,000 2,570 2,614 
License Public Service Co. Louisville Gas and Ohio Power Co. City of Vanceburg, 
of Indiana Electric Co. Kentucky 
Annual Charge $45,950.00 $95,000.00 $64,232.00 $261,103.00 
Collections to end of 
Fiscal Year 1987 $963,061.64 $8,150,353.84 $349,905.00 $1,252,472.00 
22-6

TABLE 22-4 
Lock Miles 
and Below 
Dam Pittsburgh 
OHIO RIVER LOCKS AND DAMS 
(See Section 1 of Text) 
Distance From 
Nearest Town 
Lock Dimensions Upper 
Normal 
Greatest Pool 
Length Elevation Depth on 
Width Available (feet, Miter Sills Actual Cost 
of For Full mean Year to Date of 
Chamber Width Lift sea Upper Lower Character of Foundation Percent Opened to Each Lock 
(feet) (feet) (feet) level) (feet) (feet) Lock Dam Complete Navigation and Dam 
1 - Replaced 
6 2 Emsworth Locks and Dam, 
Emsworth, PA 
2 - 
3 - 
Replaced 
Replaced 
13.3 Dashields Locks and Dam 
1.6 miles below 
Sewickley, PA 
4 - Replaced 
5 - Replaced 
6 - Replaced 
31.7 Montgomery Locks and Dam, 
1 4 miles above 
Industry, PA 
7 - Replaced 
8 - Replaced 
54 4 New Cumberland Locks and 
Dam, Stratton, OH 
9 - Replaced 
- Replaced 
- Replaced 
84.3 Pike Island Locks and Dam, 
2 miles upstream from 
Warwood, WV 
- Replaced 
- Replaced 
- Replaced 
126 4 Hannibal Locks and Dam, 
1.6 miles upstream from 
New Martinsville, WV 
15 - Replaced 
16 - Replaced 
161.7 Willow Island Locks and 
Dam, 2.7 miles above 
Waverly, WV 
110 600 18.0 710 0 17 0' 4 12 93 Rock 
56 360 15 5' 5 1293 
110 600 
56 360 10 0 692 0 13 4' 17 53 Rock 
Rock and piles 100 
Rock 
1921 
100 1929 
110 600 
56 360 17 5 682 0 16 0' 14 63 Rock and piles Rock and piles 100 
110 1,200 
110 600 205 6645 70' 14 83 Rock Rock 100 
110 
110 
1,200 
600 21 0 644 0 17.0' 18 0' Rock 
110 1,200 
110 600 21 0 6230 380 170 Rock 
110 1,200 
110 600 20 0 602 0 35 0 15 0 Rock and piles 
Rock 
Rock 
$ 870,034 
43,342,366 
'
4 
976,767 
1,144,588 
6,278,135' * 
- 1,071,472 
- 1,080,132 
- 1,123,442 
1936 31,402,550 ' * 
- 1,075,000 
- 1,167,456 
1959 39,099,688 
1,177,100 
1,138,000 
1,162,165 
100 1968 56,623,946 
- - 1,166,104 
- - 1,222,389 
- - 1,133,371 
99 1972 87,649,818 
- - 1,180,478 
- - 1,275,532 
Rock 100 1972 76,520,876 
tb3 
10 
11 
12 
13 
14 
O
0

TABLE 224 
(Continued) 
OHIO RIVER LOCKS AND DAMS 
(See Section 1 of Text) 
Lock Dimensions Upper 
Normal 
Greatest Pool 
Length Elevation Depth on 
Width Available (feet, Miter Sills Actual Cost 
Lock Miles of For Full mean Year to Date of 
and Below Distance From Chamber Width Lift sea Upper Lower Character of Foundation Percent Opened to Each Lock 
Dam Pittsburgh Nearest Town (feet) (feet) (feet) level) (feet) (feet) Lock Dam Complete Navigation and Dam 
- Replaced 
- Replaced 
- Replaced 
- Replaced 
103.9 Belleville Locks and Dam, 
0.3 mile below 
Reedsville, OH 
- Replaced 
- Replaced 
- Replaced 
237.5 Racine Locks and Dam, 
1.5 miles below 
Letart Falls, OH 
- Replaced 
- Replaced 
- Replaced 
279.2 Gallipolis Locks and Dam, 
0.7 mile below 
Hogsett, WV 
Gallipolis Modernization 
- Replaced 
- Replaced 
- Replaced 
- Replaced 
341.0 Greenup Locks and Dam, 
4.9 miles below 
Greenup, KY 
- Replaced 
- Replaced 
- Replaced 
- Replaced 
436.2 Captain Anthony Meldahl 
Locks and Dam, 2.2 miles 
above Foster, KY 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
1,200 
600 22.0 582.0 37.0 15.0' Rock and piles 
1,200 
600 22.0 560.0 18.0 15.0 Rock and piles 
600 
360 23.0 538.0 18.0 15.0 Rock 
1,200 
600 23.0 538.0 18.0 15.0 Rock 
1,200 
600 30.0 515.0 18.0' 13.0 Rock 
1,200 
600 30.0 485.0 18.0' 15 0 Rock 
Rock 
Rock 
Rock 
Rock 
Rock 
Rock 
- - $ 1,362,591 
- - 927,091 
- - 1,213,848 
- - 936,696 
100 1968 62,591,255 
- - 1,484,562 
- - 1,218,798 
- - 1,851,488 
100 1971 64,922,680 
- - 1,187,542 
- - 1,925,205 
- - 1,307,241 
100 1937 
5,687,433 
- - 5,917,056's 
- - 1,063,133 
- - 1,088,802 
- - 1,579,618 
100 1959 57,464,191 
- - 1,359,231 
- - 2,951,216 
- - 1,937,166 
- - 3,437,057 
100 1962 74,188,216 
60 
do 
17 
18 
19 
20 
21 
22 
23 
24 
25 
26 
27 
28 
29 
30 
31 
32 
33 
34 
0o 
0
H
O' 
0
Au 
0C 
0
0

TABLE 224 
(Continued) 
OHIO RIVER LOCKS AND DAMS 
(See Section 1 of Text) 
Lock Dimensions Upper 
Normal 
Greatest Pool 
Length Elevation Depth on 
Width Available (feet, Miter Sills Actual Cost 
Lock Miles of For Full mean Year to Date of 
and Below Distance From Chamber Width Lift sea Upper Lower Character of Foundation Percent Opened to Each Lock 
Dam Pittsburgh Nearest Town (feet) (feet) (feet) level) (feet) (feet) Lock Dam Complete Navigation and Dam 
35 - Replaced 
36 - Replaced 
37 - Replaced 
38 - Replaced 
531.5 Markland Locks and Dam, 
1 mile above Markland, IN 
39 - Replaced 
40 - Eliminated 
41 -- 
Falls of the Ohio, 1 mile 
above McAlpine 
604.0 McAlpine Locks and Dam 
(Reconstruction of Locks 
and Dam 41) 
42 - Eliminated 
43 - Replaced 
44 - Replaced 
45 - Replaced 
720.7 Cannelton Locks and Dam 
3 miles above 
Cannelton, IN 
46 - Replaced 
776.1 Newburgh Locks and Dam, 
16 miles above 
Evansville, IN 
47 - Replaced 
48 
49 
- Replaced 
- Replaced 
846.0 Uniontown Locks and Dam, 
3.5 miles below 
Uniontown, KY 
50 - Replaced 
51 - Replaced 
918.5 Smithland Locks and Dam, 
2 miles above 
Smithland, KY 
$ 1,894,942 
3,704,535 
1,297,924 
2,857,040 
110 
110 
N/A 
110 
110 
56 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
1,200 
600 35.0 455.0 50.0 15.0 Rock 
N/A N/A N/A N/A N/A N/A 
1,200 49.0 12.0 
600 37.0 420.0 19.0 11.0 Rock 
360 19.0 11.0 
1,200 25.0 383.0 38.0 13.0 Rock 
600 
1,200 
600 16.0 358.0 32.0 16.0 Rock 
1,200 
600 22.0 342.0 34.0 12.0 Rock 
1,200 
1,200 22.0 324.0 34.0 12.0 Rock 
Piles 
N/A 
Rock 
Rock 
100 
0 
1963 
N/A 
63,019,403 
2,222,448 
7,658,134' 
341,666 
100$ 1961 45,726,189' 
99 1972 
2,592,242 
2,819,930 
3,202,890 
96,787,43610 
- - - 3,129,028 
Pile 99 1975 104,481,255 
- - - 4,415,526 
- - - 3,062,710 
- - - 3,325,964 
Rock 99 1975 100,297,051 
-- - - 3,751,762 
- - - 4,370,566 
Rock 95 1980 273,380,297 
0

TABLE 22-4 
(Continued) 
OHIO RIVER LOCKS AND DAMS 
(See Section 1 of Text) 
Lock Dimensions 
Lock Miles 
and Below 
Dam Pittsburgh 
Distance From 
Nearest Town 
Width 
of 
Chamber 
(feet) 
Greatest 
Length 
Available 
For Full 
Width 
(feet) 
Upper 
Normal 
Pool 
Elevation 
(feet, 
mean 
Lift sea 
(feet) level) 
Depth on 
Miter Sills 
Upper Lower Character of Foundation 
(feet) (feet) Lock Dam 
Year 
Percent Opened to 
Complete Navigation 
1 4 miles below Brookport, IL 
1 4 miles below Brookport, Ii 
(New lock) 
10 8 miles above 
Mound City, IL 
10 8 miles above 
Mound City, IL (New lock) 
Mound City Lock and Dam 
1 mile below Mound City, IL 
TOTAL 
110 600 12 0 302 0 15 4 110 Pile 
110 1,200 120 3020 154 110 Pile 
110 600 134 2900 154 9 69 Pile 
110 1,200 134 2900 154 96 Pile 
Pile 100 1928 13,336,284" 
Pile 100 1969 10,197,516 
Pile 100 1929 9,994,66012 
- 100 1982 38,570,920 
- - - 1,539,470' 3 
$1,464,461,31316 
' Depths are on emergency dam foundation and are controlling depths 
2 Change from fixed dam to lift-gate dam completed in 1938 
' Depths are on poiree dam foundation and are controlling depths 
* Land chamber 
' River chamber 
SRoller-gate dam Cost not included in total Constructed under project for 
improving lower Kanawha River 
' Lock and Dam 41 completed with 110- by 600-foot lock in 1921 Completed 
with new dam and raised canal and lock wall in 1928 Auxiliary 56- by 360-foot 
lock constructed in 1929-30 Reconstruction and modernization began 1956, 
renamed McAlpine Locks and Dam in 1960 Operation of auxiliary lock 
suspended in 1971 
Completed except for deferred alteration of iailroad bridge 
2 Dam below not yet constructed Depth on lower miter sill at lower water 
o10 Reflects reduction of $2,219,975 payment for settlement of damage to dam 
caused by barge accident in April 1978 
" Includes $8,874,537 for major rehabilitation project initiated in FY 1979 
12 Includes $4,583,992 for major rehabilitation project initiated in FY 1979 
13 For preconstruction planning 1965 to 1972. No longer considered authorized 
See Section 1 of text 
" Includes $37,480,601 for major rehabilitation initiated in FY 1980 
14* Includes $25,664,939 for major rehabilitation initiated in FY 1983 
14**Includes $2,745,059 for major rehabilitation initiated in FY 1986 
(O&M funds) 
'15 Includes $4,250,000 Inland Waterways Trust Funds 
'6 Exclusive of $6,994,235 details below 
Additional Features Entering into Cost of Project 
Louisville and Portland Canal and Indiana chute $ 
(under previous project) 
Examinations, survey contingencies, plants and miscellaneous 
Recreation facilities, pool area, Gallipolis Locks and Dam 
TOTAL 
GRAND TOTAL 
5,359,203 
966,232 
668,800 
6,994,235 
$1,473,675,523 
52 938 9 
938 9 
53 962 6 
962 6 
974 2 
0 
Actual Cost 
to Date of 
Each Lock 
and Dam 
ITJ 
0
O1 
0
O
0
0

NASHVILLE, TN, DISTRICT * 
This district comprises portions of southern Ken- western portion, and embraces drainage basins of 
tucky, southwestern Virginia, western North Caro- Tennessee and Cumberland Rivers and their tribulina, 
northern Georgia and Alabama, northeastern taries. 
Mississippi and practically all of Tennessee except 
IMPROVEMENTS 
Navigation Page General Investigations Page 
1. Cumberland River, TN and KY ........ 23-2 
2. Tennessee River, TN, AL and KY ...... 23-3 
3. Tennessee-Tombigbee Waterway, AL 
and MS ........................... 23-4 
4. Navigation Work Under Special 
Authorization ...................... 23-4 
Alteration of Bridges 
5. Authorized Alteration of Bridges ...... 23-4 
Flood Control 
6. Big South Fork National River and 
Recreation Area, KY and TN .......... 23-4 
7. Martins Fork Lake, KY .............. 23-5 
8. Middlesboro, Cumberland River 
Basin, KY ......................... 23-5 
9. Tug and Levisa Forks of the Big Sandy 
River and Cumberland River, W VA, 
VA and KY ......................... 23-5 
10. Ohio River Basin (Nashville Dist.) .... 23-6 
11. Inspection of completed flood 
control projects ..................... 23-6 
12. Flood control work under special 
authorization ...................... 23-6 
Multiple-Purpose Projects, Including Power 
13. Center Hill Lake, Ohio River 
Basin, TN ........................ . 23-6 
14. Dale Hollow Lake, Ohio River Basin, 
TN and KY ........................ 23-7 
15. J. Percy Priest Dam and Reservoir, 
Ohio River Basin, TN ................ 23-7 
16. Laurel River Lake, Ohio River 
Basin, KY ......................... 23-7 
17. Wolf Creek Dam-Lake Cumberland, 
Ohio River Basin, KY ................ 23-8 
18. 
19. 
Surveys ............................ 23-8 
Collection and study of basic data ...... 23-8 
Tables 
Table 23-A Cost & Financial Statement ..... 
Table 23-B Authorizing Legislation ........ 
Table 23-C 
23-9 
23-11 
Other Authorized Navigation 
Projects ..................... 23-13 
Table 23-D Not Applicable 
Table 23-E Other Authorized Flood Control 
Projects ..................... 
Table 23-F Other Authorized Multiple- 
Purpose Projects, Including 
Pow er ........................ 
Table 23-G Deauthorized Projects .......... 
Table 23-H 
23-13 
23-14 
23-14 
Cumberland River, TN & KY, 
Principle Features ............. 23-15 
Table 23-I Tennessee River Lock 
Dimensions .................. 23-17 
Table 23-J 
Table 23-K 
Tennessee River Total Cost of 
Existing Project .............. 
Ohio River Basin (Nashville 
District) Local Protection ...... 
Table 23-L Reservoirs .................... 
Table 23-M 
Table 23-N 
Inspection of Completed Flood 
Control Projects ............... 
23-18 
23-18 
23-18 
23-19 
Flood Control Work Under 
Special Authorization .......... 23-19 
23-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. CUMIBERLAND RIVER, TN AND KY 
Location. Formed by junction of Poor and Clover 
Forks in Harlan County, Ky., about 694.2 miles above 
its mouth, and flows west to Burnside, Ky., from 
whence it makes a loop southwestward into Tennessee, 
passes Nashville, and returns northwestward to 
Kentucky, emptying into Ohio River near Smithland, 
Ky. (See Geological Survey base maps of Tennessee 
and Kentucky.) 
Previous projects. For details see pages 1898 and 
1901 of Annual Report for 1915, and page 1208 of 
Annual Report for 1938, and pages 1069 and 1070 of 
Annual Report for 1962. 
Existing project. Below Nashville: Improvement of 
Cumberland River between mouth and Nashville was 
authorized for 9-foot navigation; increased project 
depth to be obtained by construction of three moderate 
height dams with lockage facilities, designated as 
Kuttawa (Eureka), Dover, and Cheatham, to replace 
existing locks A to F inclusive below Nashville and 
lock 1 above Nashville. (See table 23-B for authorizing 
legislation.) Subsequent authorities provided for 
construction of hydroelectric power-generating facilities 
at Cheatham Dam, river mile 148.7, and modification 
of project for navigation on Cumberland River, 
Tenn. and Ky., to provide, in lieu of previously authorized 
works at Kuttawa, mile 32.2, and Dover, mile 
100.1, for construction of a multiple-purpose improvement 
consisting of a dam, lock, and powerplant near 
mile 30.6 on lower Cumberland River and a canal for 
navigation and other purposes connecting this reservoir 
with reservoir formed by Kentucky Dam on the 
Tennessee River. The project is known as Barkley 
Dam and Lake Barkley. Provision of interconnecting 
canal, involving excavation of a channel through narrow 
watershed divide about 2.5 miles upstream from 
damsite, permits alternative routes available for navigation 
between either Cumberland or Tennessee 
Rivers and Ohio River, and affords integrated operation 
of Barkley and Kentucky Reservoirs through 
diversion of flows in interests of flood control and 
power production. Cost of modified project for 9-foot 
navigation and multiple-purpose development is 
$178,181,406 Federal funds and $102,966 non-Federal 
funds for recreation facilities under the completed 
projects program. (See table 23-H for listing of principal 
features.) 
Under flood conditions as regulated by upstream 
reservoirs, extreme fluctuation in stage of river below 
Nashville, Tenn., varies at different localities from 
about 16 to 55 feet above minimum pool levels. Ordinary 
fluctuations vary with power flows from as 
much as the allowable 3-foot drawdown below normal 
pool elevation 385 at Cheatham Lock and Dam to a 
range of about 7 feet at Nashville. Seasonal variation 
in normal headwater levels at Lake Barkley is 5 feet, 
which in combination with power flows produces 
fluctuations up to 10 feet below Cheatham Lock and 
Dam. 
Above Nashville: See pages 1693 thru 1696 of 
Annual Report for 1950 for information including 
statistical data on locks and dams 1 to 17 and 21. 
Completion information is shown on pages 1454 of the 
report for 1951. See Table 23-B for Authorizing Legislation. 
Construction of Old Hickory, Carthage, and 
Celina Dams above Nashville was also authorized for 
navigation and power. The dam and reservoir authorized 
for construction on Cumberland River near 
Carthage, Tenn., has been redesignated as Cordell 
Hull Dam and Reservoir. Cost of Old Hickory and 
Cordell Hull projects, including locks, is $132,140,904. 
Estimated cost of Celina Dam (1985) is $213,000,000. 
(See table 23-H at end of chapter for listing of principal 
features.) 
Under flood conditions as presently regulated, including 
effect of surcharge operation of Old Hickory 
project, extreme fluctuations of stage in this section 
of river vary from a range of 35 feet at Nashville 
(mile 191) to a maximum of 46 feet immediately below 
Old Hickory Dam (mile 216.2), and from an 
8-foot variation in headwater at dam to 36 feet in 
vicinity of Carthage, Tenn., (mile 313.5), present 
head of navigation; with variations up to 35 feet at 
Celina, Tenn. (mile 380.8) and 29 feet in tailwater at 
Wolf Creek Dam (mile 460.9). Maximum fluctuations 
under ordinary conditions from power flows vary 
from about 7 feet at Nashville to 14 and 3 feet, respectively, 
in tailwater and headwater of Old Hickory 
Dam, and at other key points as follows: 13 feet at 
Carthage; 18 feet at Celina; and 19 feet at Wolf Creek 
Dam. 
Further details on project authorization for river 
sections below and above Nashville are shown on 
Table 23-B. 
Local cooperation. Under modified project for 9- 
foot navigation and multiple-purpose development, 
recreation features of reservoir components are subject 
to certain conditions of non-Federal cost-sharing 
under Federal Water Project Recreation Act of 1965. 
Terminal facilities. There are 41 terminals on the 
Cumberland River (3 municipally owned and open for 
public use; 4 government owned facilities and 34 privately 
owned facilities). A total of 21 terminals have 
23-2

NASHVILLE, TN, DISTRICT 
railroad connections. Principal commodities handled 
are petroleum products, stone, sand, gravel, coal, coke, 
iron, steel, chemicals, and grain. Facilities considered 
adequate for existing commerce. For further information 
see page 695 of Annual Report for 1969. 
Operations during fiscal year. New work: Below 
Nashville: Recreation facilities provided at Barkley 
project under (Code 711) cost $75,586. 
Maintenance: Barkley, Cheatham, Cordell Hull, and 
Old Hickory locks and dams were operated as required. 
Operation and Maintenance improvements at 
Barkley included painting of spillway gates, switchyard 
and crane, and paving. Dredging below Old 
Hickory continued and Cheatham lock was unwatered 
and repaired. Painting of spillway gates at Cordell 
Hull was completed. At Old Hickory repairs on cracks 
in lock walls and replacement of quion and miter 
blocks were begun. 
Total net energy generated at Barkley Dam 
(667,015,961 kw-hr) was made available through Department 
of the Interior to the Tennessee Valley Authority, 
Southern Illinois power Cooperative, Big 
Rivers Rural Electric Cooperative Corporation, and 
Indiana Statewide Rural Electric Cooperative, Inc., 
Hoosier Energy Division. Total net energy generated 
at Cheatham Dam (174,200,153 kw-hr), Cordell Hull 
(354,306,065 kw-hr), and Old Hickory (484,315,010 
kw-hr) was made available for distribution. Activities 
under reservoir management program comprising 
malaria control, shoreline sanitation, land management 
and disposal, and maintenance of public-use facilities 
continued. 
2. TENNESSEE RIVER, TN, AL AND KY 
Location. Formed by junction of French Broad and 
Holston Rivers in eastern Tennessee, 4.4 miles above 
Gay Street Bridge at Knoxville, flows southwest into 
northern Alabama, thence in a generally westerly 
course across north Alabama, to northeast boundary 
of Mississippi, thence nearly due north across Tennessee 
and Kentucky, entering Ohio River at Paducah, 
652.1 miles from junction of French Broad and Holston 
Rivers. (See Geological survey base map of Tennessee 
River Basin.) 
Previous projects. For details see pages 1902-1906, 
Annual Report for 1915; pages 1190-1194, 1196-1216, 
and 1220-1222, Annual Report for 1929; and page 
1216, Annual Report for 1938. 
Existing project. Originally provided for permanent 
improvement of river for a navigable depth of 9 feet 
at low water from mouth about 650 miles to Knoxville, 
Tenn. Only work performed by the Corps was construction 
of lock at General Joe Wheeler Dam and 
miscellaneous appurtenant improvements at a new 
work cost of $2,244,236. Tennessee Valley Authority 
program provided for obtaining authorized 9-foot 
project by construction of high dams and locks and 
utilization of certain locks and dams previously constructed 
under jurisdiction of the Corps. (See Table 
23-B for Authorizing Legislation.) Subsequent construction 
by that agency of Melton Hill Dam extends 
navigable channel of Tennessee River system up the 
Clinch River about 38 miles above damsite (mile 23.1) 
to vicinity of Clinton, Tenn. (See table 23-I on Tennessee 
River.) 
In accordance with general navigation laws placing 
control and supervision over navigable waters under 
direction of Secretary of the Army, the Corps of 
Engineers operates and maintains all locks, and maintains 
navigation channels and safety harbors by performing 
all necessary maintenance dredging and 
snagging operations. For information concerning 
other functions of the Corps under division of responsibilities 
for Tennessee River since adoption of Tennessee 
Valley Authority Act of 1933, see page 1084 of 
Annual Report for 1962. 
Local cooperation. Authorization requires no local 
cooperation in construction of alternate system of low 
dams. It does, however, provide that if high dams are 
built before the United States builds projected locks 
and low dams which are to be replaced, the United 
States shall contribute to cost of substituted structures 
an amount equal to estimated cost of works of 
navigation for which substitution is made. 
Terminal facilities. There are 150 terminals on the 
Tennessee River (10 municipally owned, 16 government 
owned facilities and 124 privately owned facilities). 
A total of 81 terminals have railroad connections. 
Principal commodities handled are petroleum products, 
stone, sand, gravel, coal, coke, grain, chemicals, 
iron, and steel. Facilities considered adequate for 
existing commerce. A list of terminals is revised annually 
and can be obtained from Division Engineer, 
Ohio River Division, Corps of Engineers, Cincinnati, 
Ohio. For further information see page 698 of Annual 
Report for 1969. 
Operations during fiscal year. Channel work by government 
plant and hired labor consisted of dredging 
and snagging at various locations, and maintenance 
of mooring facilities and safety harbors. Cost of channel 
maintenance was $593,997. Maintenance: All locks 
were operated and lock appurtenances and standby 
plant maintained as required. Major repairs were 
completed at Pickwick Auxiliary Lock and were begun 
at Wilson Auxiliary Lock. In addition other major 
maintenance included revising lock lighting at Ken- 
23-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
tucky Lock, unwatering Nickajack Lock, construction 
of shop building at Chickamauga, and repair to culvert 
valves at Ft. Loudoun. Work was begun to install 
gear reducers at the main lock at Pickwick and revise 
lock lighting at Wilson Lock. 
3. TENNESSEE-TOMBIGBEE 
WATERWAY, AL AND MS 
Location. West Central Alabama and Northeastern 
Mississippi; in Marengo, Sumter, Greene and Pickens 
Counties, Alabama, and Noxubee, Lowndes, Clay, 
Monroe, Itawamba, Prentiss and Tishomingo Counties, 
Mississippi. 
Existing project. Provides for a waterway 234 miles 
in length, connecting the Tombigbee and Tennessee 
Rivers by way of the East Fork of Tombigbee River, 
Mackeys and Yellow Creeks, affording a channel not 
less than 9 feet deep and 280 feet in bottom width, 
with 10 locks each having clear chamber dimensions 
of 110x600 feet. Construction of the divide section, 
including Bay Springs lock and dam, is assigned to 
the Nashville District; whereas, the prosecution of 
work on the river and canal sections is under the jurisdiction 
of the Mobile District. Only activities of the 
Nashville District are reported hereon. Estimated 
Federal cost of new work under jurisdiction of the 
Nashville District is $750,000,000. (See 23-B for authorizing 
legislation.) 
Local cooperation. Authorization requires local interests 
to construct, maintain and operate all highway 
bridges, construct and maintain all highway relocations 
or alterations, make and maintain alterations as 
required to sewer, water supply and drainage facilities, 
assume cost of operation and maintenance of 
utility crossings, provide and maintain as required 
suitable and adequate river and canal terminals in 
accordance with plans approved by the Secretary of 
the Army and the Chief of Engineers. 
Operations during fiscal year. Various structural 
revisions and repairs in the Divine Section, and repairs 
to Tishomingo County Roads were completed. 
In addition recreation work continued. Initial facilities 
were provided at Natchez Trace, Crow's Neck and 
BS Damsite. A contract was awarded to provide campsites 
at the Piney Grove site. The project is 99% 
complete. Navigation features are 100% complete. 
4. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Sec. 107, Public 
Law 86-645, as amended (preauthorization). 
During the period $77,809 was expended for a 
study of Port of Florence, AL., $483 for Tennessee 
River at Calvert City, TN., and $61,193 for Tennessee 
River at Morgan City Port, AL. 
Alteration of Bridges 
5. AUTHORIZED ALTERATION OF 
BRIDGES 
Work on Woodland Street bridge, under Truman- 
Hobbs Act, was initiated in 1965 and completed in 
1966. Costs were $987,632. For details see page 922 of 
Annual Report for 1967. 
Flood Control 
6. BIG SOUTH FORK NATIONAL RIVER 
AND RECREATION AREA, KY AND TN 
Location. The proposed project is located in Northeastern 
Tennessee and Southeastern Kentucky along 
the Big South Fork River and its tributaries in Pickett, 
Scott, Fentress, and Morgan Counties, Tennessee, and 
McCreary County, Kentucky. 
Existing project. A National Recreation Area was 
established in accordance with the concept included 
in the interagency report prepared pursuant to section 
208 of Flood Control Act of 1968. Total acreage is not 
to exceed 125,000 acres. The act specifically establishes 
the National Area for the purpose of preserving 
and interpreting the scenic, biological, archaeological 
and historical resources of the river gorge area and 
developing the natural recreational potential of the 
area. The area is divided into two categories, gorge 
and adjacent areas, with no construction permitted 
except limited clearing for establishment of day-use 
facilities, historical sites, primitive campgrounds and 
access roads. Lodges and other facilities will be provided 
in the adjacent areas. The project was authorized 
by the Water Resources Development Act of 1974 
1976 and Water Resources Development Act of 1986. 
(See table 23-B for authorizing legislation.) The 
present authorized cost (ceiling) for the project is 
$156,122,000. The National Park Service operates and 
maintains the useable units of the area upon completion 
of land acquisition and construction by The Corps 
of Engineers. The first construction contract was 
awarded in June 1981. The project is 62% complete. 
Local cooperation. None required. 
23-4

NASHVILLE, TN, DISTRICT 
Operations during fiscal year. Engineering and design 
continued. Acquired 699.05 acres fee. Construction 
was completed at the Blue Heron Overlook and 
Bandy Creek recreation site, and continued on the 
access road and recreation facilities at Blue Heron 
with the award of a second phase of recreation. 
7. MARTINS FORK LAKE, KY 
Location. Dam located at mile 15.6 on Martins Fork 
of Clover Fork, Cumberland River, about 10 miles 
southeast of city of Harlan, with reservoir extending 
about 6 miles upstream within Harlan County, southeastern 
Kentucky. 
Existing project. Multiple-purpose improvement 
combining flood control with water quality control 
and recreation development adopted by 1965 Flood 
Control Act (H. Doc. 244, 89th Cong.), in general 
accordance with recommendations. Dam will be concrete 
type, about 504 feet long and rising 97 feet above 
streambed. Outlet works provide for release of water 
from reservoir at varying levels. Drainage area above 
damsite is 55.7 square miles. At full pool level, spillway 
crest at elevation 1341 above mean sea level, 
reservoir will cover 578 acres and contain 21,120 acrefeet 
of storage capacity. Provision is made for 17,450 
acre-feet of reservoir capacity between elevations 
1341 and 1300 for control of floods in winter and 
spring season, and 14,360 acre-feet (El. 1341-1310) 
during summer and fall, in conjunction with which 
storage of 3,090 acre-feet would be available on a 
seasonal basis to meet streamflow requirements for 
water quality control and fish life below the dam. A 
minimum permanent pool of 3,670 acre-feet, 274 acres 
in extent, will thus be provided during potential flood 
seasons; and during late spring and summer when 
flood storage can be reduced, the lake is to be operated 
generally at a higher level (El. 1310) to maintain a 
larger surface area of 340 acres for recreation and to 
provide the required seasonal storage for releases of 
water during critical low-flow periods. Project will 
prevent major portion of average annual flood losses 
at Harlan and result in significant stage reductions 
with related benefits along rural reaches and at other 
urban areas downstream. Actual cost of project including 
$95,000 code 710 funds is $20,479,911. First 
construction contract awarded in December 1972. 
Project completed for beneficial use in September 
1978. 
Local cooperation. Federal Water Project Recreation 
Act of 1965 (P.L. 89-72) applies in regard to 
non-Federal participation in recreation development, 
in addition to which local interests are to provide certain 
safeguards to ensure functioning of reservoir as 
intended. In May 1981 a final recreation cost-sharing 
contract with Harlan County was approved and certain 
recreation facilities have been jointly developed 
by the Corps and the County. These facilities, consisting 
of a swimming beach and a picnic area are 
now operated and maintained by Harlan County. 
Recreation investment to date (Corps and Local) is 
about $100,000. 
Operations during fiscal year. New work: None. 
Maintenance: Dam was operated and structures operated 
as required. 
8. MIDDLESBORO, CUMBERLAND 
RIVER BASIN, KY 
Location. At Middlesboro, Ky., on Yellow Creek, a 
tributary entering Cumberland River about 660 miles 
above its mouth. 
Existing project. A system of canals and levees 
around one side of town, arranged so as to divert most 
headwaters of Yellow Creek away from present channel 
through heart of city. Protection is thus afforded 
in large measure to life and property within business 
district and a large part of residential section. For 
project details, see page 1088 of Annual Report for 
1962. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: Work 
on levees, canals, and appurtenances was accomplished 
by hired labor. 
9. TUG AND LEVISA FORKS OF THE 
BIG SANDY RIVER AND UPPER 
CUMBERLAND, WV, VA AND KY 
Location. The project is located in the State of 
West Virginia and the Commonwealths of Kentucky 
and Virginia. The Cumberland portion consists of 
the Upper Cumberland River Basin, above Cumberland 
Falls, Ky. The basin is approximately 100 miles 
in length, averaging 30 miles in width at the lower 
portion and 10 miles in width upstream at Harlan, 
Ky. The Big Sandy Basin is within the Huntington 
District and the Cumberland within the Nashville 
District. 
Existing project. Provides for flood control measures 
for communities in the Tug and Levisa Forks 
and Upper Cumberland River Basins. The Cumberland 
portion has been assigned to the Nashville District. 
Only activities of the Nashville District are 
23-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
reported hereon. Estimated Federal cost of new work 
under jurisdiction of the Nashville District is currentby 
being formulated. The project was authorized by 
the Energy and Water Development Appropriation 
Act of 1981, Section 202 of PL 96-367. 
Local cooperation. Authorizing legislation requires 
that non-federal interests shall hold and save the 
United States free from damages due to construction 
works and maintain and operate all such works after 
their completion in accordance with regulations by 
the Secretary of the Army. 
Operations during fiscal year. Engineering and design 
continued. Acquired 25.69 acres fee. Construction 
of the Pineville Levee was completed and work on the 
highway and floodwall continued. A contract was 
awarded for the first phase of Wallsend Levee and 
construction of the 459 Bridge at Barbourville. Funds 
were provided by the state of Kentucky for the bridge 
approach. Design of the Harlan Structural project 
was begun and some nonstructural evacuations were 
accomplished at Harlan and Pineville. 
10. OHIO RIVER BASIN 
(NASHVILLE DISTRICT) 
Location. A series of levees, floodwalls, channel 
improvements, and reservoirs in Ohio River Basin 
within Nashville District. 
Existing project. The general comprehensive plans 
approved for flood control and other purposes in Ohio 
River Basin is set forth in legislation listed in Table 
23-B. Individual projects, local protection projects 
and lakes, considered in comprehensive plan within 
Nashville District are listed in Table 23-K. 
11. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Flood Control Act of June 22, 1936, and subsequent 
acts, requires local interests furnish assurances they 
will maintain and operate certain local protection 
projects after completion in accordance with regulations 
prescribed by Secretary of the Army. District 
Engineers are responsible for administration of these 
regulations within their respective districts. Maintenance 
inspections were made during fiscal year of 
completed protective works in localities transferred to 
local interests for maintenance and operation. Local 
interests were advised, as necessary, of measures required 
to maintain projects in accordance with standards 
prescribed by regulations. Fiscal year cost was 
$9,374. Total cost to September 30, 1987 was $283,531. 
For project inspection data see table 23-M. 
12. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control and coastal emergencies (Public Law 
99, 84th Cong., and antecedent legislation). 
Actual Federal costs for fiscal years were $248,542 
for disaster preparedness. 
Multiple-Purpose Projects, Including Power 
13. CENTER HILL LAKE, OHIO RIVER 
BASIN, TN 
Location. Dam is on Caney Fork River, 26.6 miles 
above its confluence with Cumberland River (mile 
309.2) at Carthage, Tenn. It is in DeKalb County, 
Tenn., about 55 miles east of Nashville, and 14 miles 
southeast of Carthage, Tenn. Reservoir extends about 
64 miles up main stream and about 10 miles up Falling 
Water River and lies within DeKalb, Putnam, 
White, and Warren Counties, Tenn. 
Existing project. A combination earth and concrete 
gravity-type dam, hydroelectric powerplant, and reservoir 
for primary purposes of flood control and 
power production, with a permanent pool for public 
use and conservation purposes. In addition to main 
dam structure, provision was made for a rolled-earth 
dike to close a saddle in reservoir rim near damsite. 
For further details, see page 1099 of 1962 Annual Report. 
Actual cost of project including $8,940,642 code 
710 funds is $53,412,022. 
Local cooperation. None required on completed 
project. Recreation development subject to certain 
conditions of non-Federal cost-sharing under Federal 
Water Project Recreation Act of 1965. 
Operations during fiscal year. New work: None. 
Maintenance: Dam was operated and structure and its 
appurtenances maintained as required. Operation of 
powerplant was continuous except for normal interruptions 
and necessary shutdowns for inspection and 
maintenance purposes. Major maintenance work 
items were replacement of power plant roof and 
thrust bearing springs. Total net energy generated 
(333,985,400 kw-hr) was made available through Department 
of the Interior to Tennessee Valley Authority 
for distribution. Activities under reservoir 
management involved land management, public relations, 
and maintenance of public use facilities. 
23-6

NASHVILLE, TN, DISTRICT 
14. DALE HOLLOW LAKE, OHIO RIVER 
BASIN, TN AND KY 
Location. Dam is on Obey River, 7.3 miles above its 
confluence with Cumberland River (mile 380.9) at 
Celina, Tenn. It is in Clay County, Tenn., and about 
80 miles northeast of Nashville, Tenn., 28 miles north 
of Cookeville, Tenn., and 3 miles east of Celina, Tenn. 
Reservoir extends about 51 miles up main stream, 10 
miles up East Fork, and 6 miles up West Fork of Obey 
River, and lies within Cumberland and Clinton Counties, 
Ky., and Clay, Pickett, Overton, and Fentress 
Counties, Tenn. 
Existing project. A concrete gravity-type dam, hydroelectric 
powerplant, and reservoir for primary 
purposes of flood control and power production with 
a permanent pool for public use and conservation purposes. 
See page 1096 of 1962 Annual Report for 
project details. Cost of project including $2,195,600 
code 710 funds and $150,000 non-Federal funds for 
recreation facilities under the completed projects program 
is $28,317,746. 
Local cooperation. None required on completed 
project; future recreation development subject to certain 
conditions of non-Federal cost-sharing under 
Federal Water Project Recreation Act of 1965. 
Operations during fiscal year. New work: None. 
Maintenance: Dam was operated and structures and 
appurtenances maintained as required. Operation of 
powerplant was continuous except for normal interruptions 
and necessary shutdowns for inspection and 
maintenance purposes. Total net energy generated 
(92,454,057 kw-hr) was made available through 
Department of the Interior to Tennessee Valley Authority 
for distribution. Activities under reservoir 
management program involved public relations, land 
management, and maintenance of public-use facilities. 
Major accomplishments were replacement of power 
plant roof and paving of roads and parking area. 
15. J. PERCY PRIEST DAM AND 
RESERVOIR, OHIO RIVER BASIN, TN 
Location. Damsite is on Stones River, 6.8 miles 
above its confluence with Cumberland River (mile 
205.9); in Davidson County, Tenn.; and about 7 miles 
east of Nashville, Tenn. Reservoir extends southeasterly 
from dam about 32 miles along main stream, 10 
miles up East Fork, 6.5 miles up West Fork, and for 
shorter distances up other tributaries of Stones River; 
and lies within Davidson, Rutherford, and Wilson 
Counties, Tenn. 
Existing project. A combination earth and concrete 
gravity-type dam, hydroelectric powerplant, and reservoir 
for primary purposes of flood control, power 
production and recreation. For further details see 
page 703 of 1969 Annual Report. Cost of project including 
$3,260,400 under code 710 funds and $46,000 
non-Federal funds for recreation facilities under the 
completed projects program is $56,914,039. 
Local cooperation. Recreation development subject 
to certain conditions of non-Federal cost-sharing under 
Federal Water Project Recreation Act of 1965. 
Operations during fiscal year. New work: None. 
Maintenance: Dam was operated and structures and 
appurtenances maintained as required. Total net 
energy generated (69,015,300 kw-hr) was made available 
through Department of the Interior to Tennessee 
Valley Authority for distribution. Activities under 
reservoir management program involved public relations, 
fish and wildlife management, and maintenance 
of public-use facilities. Contracts were awarded for 
construction of the resident engineer's office, and 
improvements at East Fork Recreation area. 
16. LAUREL RIVER LAKE, OHIO RIVER 
BASIN, KY 
Location. Damsite is at mile 2.3 on Laurel River, a 
tributary of Cumberland River, in southcentral Kentucky. 
The two streams meet about 9 miles below 
Cumberland Falls, a prominent physiographic feature 
at head of Lake Cumberland which is formed by Wolf 
Creek Dam. Reservoir extends 1.9.2 miles upstream to 
site of Corbin, Ky. water-supply dam and lies within 
Laurel and Whitley Counties. 
Existing project. Project approved in general accordance 
with recommendations of House Document 
413, 86th Congress, by 1960 Flood Control Act, as 
amended by Public Law 88-253, was designed for 
purposes of flood control, power, and recreation as an 
integral unit of a coordinated plan for development of 
water resources of Cumberland River Basin. With the 
view of a net gain in power potential on a system 
basis, the plan of improvement incorporated appropriate 
flood control storage in the proposed project 
and corresponding adjustment in operations of Wolf 
Creek Dam-Lake Cumberland for flood control and 
power, which in effect constituted a transfer of reser 
voir capacity without entailing a change in flood 
control benefits. Further detailed study giving full 
consideration to power capabilities and marketing arrangements 
indicated the advantage of maintaining 
present storage allocation at Wolf Creek and use of 
all available storage capacity of Laurel River Lake 
23-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
for power. The power plant is complete. Recreation 
was completed this FY. Total cost is $56,741,232. 
Local cooperation. None required. 
Operations during fiscal year. New work: None. 
Maintenance: Dam was operated and structures and 
appurtenances maintained as required. Total net 
energy generated (58,765,000 kw-hr) was made available 
through Department of the Interior for distribution. 
17. WOLF CREEK DAM-LAKE 
CUMBERLAND, OHIO RIVER 
BASIN, KY 
Location. Wolf Creek Dam is on Cumberland River 
at mile 460.9 (above mouth) in Russell County, Ky., 
about 10 miles southwest of Jamestown and 12 miles 
north of Albany, Ky. Lake Cumberland extends 101 
miles up main stream, 48 miles up South Fork of 
Cumberland River, in Russell, Clinton, Wayne, 
Pulaski, McCreary, Laurel, and Whitley Counties, Ky. 
Existing project. A combination earth and concrete 
gravity-type dam, hydroelectric powerplant, and reservoir 
for primary purposes of flood control and 
power production, with a permanent pool for publicuse 
and conservation purposes. See page 1094 of 1962 
Annual Report for project details. Cost of project is 
$188,267,195. This cost includes $3,259,372 code 710 
funds, $880,000 non-Federal funds for recreation facilities 
under the completed program, and $104,999,237 
for major rehabilitation. 
Local cooperation. None required on completed 
project; future recreation development subject to certain 
conditions of non-Federal cost-sharing under 
Federal Water Project Recreation Act of 1965. 
Operations during fiscal year. New work: Activity 
involving the integrity of the structure began in 1968 
when a leak or seepage developed in the embankment. 
The major rehab embankment contract was physically 
completed in September 1982. Maintenance: Dam 
was operated and structures and appurtenances maintained 
as required. Operation of powerplant was continuous 
except for normal interruptions and necessary 
shutdowns for inspection and maintenance purposes. 
Replacement of the power plant roof was completed 
and contracts were awarded to replace the intake 
hoist cables and pave the Alligator recreation site 
area. Total net energy generated 824,645,000 kw-hr) 
was made available through Department of the Interior 
for distribution. Activities under reservoir 
management program involved land management activities, 
public relations, and maintenance of publicuse 
facilities. 
General Investigations 
18. SURVEYS 
Costs for this period were $1,850,239 for which 
$1,391,824 was for navigation, $387,664 for flood 
damage prevention studies, $64,769 for special investigations, 
and $5,982 for coordination studies with 
other agencies. 
19. COLLECTION AND STUDY OF 
BASIC DATA 
Costs for this period were $28,647 for technical 
services to others, and $44,964 for flood plain management 
services, totalling $73,611. 
23-8

NASHVILLE, TN, DISTRICT 
TABLE 23-A COST AND FINANCIAL STATEMENT 
See 
Section 
in Text 
1. Cu 
TN 
Project 
mberland River, 
and KY 
2. Tennessee River, 
TN, AL and KY 
3. Tenn.-Tombigbee 
Waterway, AL and MS 
5. Big South Fork National 
River and Rec. Area, 
KY and TN 
6. Martins Fork Lake, KY 
7. Middlesboro, Cumberland 
River Basin, KY 
8. Tug & Levisa Forks of the 
Big Sandy & Cumberland 
River, WV, VA and KY 
11. Cumberland, KY 
12. Center Hill Lake, 
Ohio River Basin, TN 
13. Dale Hollow Lake 
Ohio River Basin, 
TN and KY 
14. J. Percy Priest Dam and 
Reservoir, Ohio River 
Basin, TN 
15. Laurel River Lake, 
Ohio River Basin, KY 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
FY 84 
11 
FY 85 FY 86 
Total to 
FY 87 Sep 30, 1987 
929,000 - 7,800 - - 320,252,240 1,2,3 
523,103 722,194 538 75,587 320,252,240 1,2,3 
[4,670,200 18,453,000 18,496,000 16,388,500 196,874,176 4 
5,494,335 18,461,695 18,461,695 16,532,247 196,033,548 5 
- - - - 16,251,428 6 
- - - - 16,251,428 0 
6,848,500 9,855,000 16,900,000 13,763,000 132,150,951 7 
6,978,158 9,755,161 16,908,385 13,527,412 131,560,620 8 
- - - - 400,000 
- - - - 400,000 
25,000,000 19,755,000 11,405,000 1,435,000 737,595,050 
17,837,084 27,688,233 6,844,558 2,954,077 733,256,609 
10,300,000 8,405,000 10,231,765 8,648,000 99,938,920 9 
9,432,902 9,183,262 10,105,683 5,883,134 96,229,341 10 
- 50,000 - - 6,765 - 20,479,911 
244 - - 6,765 - 20,479,911 
406,000 545,000 480,000 676,000 3,906,000 
401,981 523,757 507,448 658,851 3,873,930 
- - - - 817,830 11 
- - - - 817,830 11 
22,000 65,000 27,000 64,000 1,786,844 
27,384 60,309 28,020 63,990 1,779,463 
4,000,000 13,684,000 11,840,000 23,263,000 65,757,000 12 
8,286,077 14,504,087 12,317,354 17,204,246 58,307,208 13 
- - - - 66,642 
- - - - 66,642 
9,000 - - - 53,412,023 14 
153,247 2,209 - - 53,412,023 15 
3,790,000 3,198,000 2,820,000 3,341,000 43,358,967 16 
4,078,470 3,195,628 2,853,975 3,277,917 43,213,77517 
30,000 - 17,700 - - 28,317,746 18 
341,796 5,509 - - 28,317,746 19 
2,554,000 3,180,000 3,007,000 3,108,000 42,139,807 20 
2,732,605 2,966,610 3,101,316 3,087,685 41,978,526 21 
- - - - 56,914,039 22 
3,810 471 - - 56,914,039 2 
2,290,500 2,553,000 2,353,000 2,740,000 27,855,586 24 
2,173,573 2,489,352 2,497,915 2,646,484 27,666,411 25 
545,000 - 58,000 - 56,741,232 
379,374 219,221 141,682 - 56,741,232 
771,000 864,000 886,000 850,000 6,893,000 26 
828,369 840,428 883,590 817,325 6,820,577 26 
23-9 
1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 23-A 
(Continued) 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep 30, 1987 
16. Wolf Creek Dam and New Work 
Lake Cumberland, Approp. - 12,300 77,800 - - 83,267,958 27 
Ohio River Basin, KY Cost 2,615 79,000 9,190 - 83,267,958 27 
Maint. 
Approp. 3,894,000 5,360,000 4,847,000 5,361,000 60,707,441 28 
Cost 4,097,459 5,066,321 5,055,966 5,272,882 60,426,477 29 
Rehab. 
Approp. - 35,000 - - - 104,999,237 30 
Cost 7,249 - - - 104,999,237 30 
1. Includes $9,707,354 for abandoned and/or replaced works 
under the old Cumberland River system. (Amount includes 
$826,253 for new work and $3,266,706 for maintenance on previous 
projects.) 
2. Includes $61,733 public works acceleration funds, and 
$102,966 contributed by the State of Kentucky and $6,750 contributed 
by Metropolitan Nashville, TN. 
3. Includes $298,000 funds provided from the Productive 
Employment Appropriation Act (PL 98-8) of 1983. 
4. Includes $955,889 for special recreation use fees, and 
$1,743,157 for maintenance and operation of dams and other 
improvements of navigable waters, and $1,892,000 funds provided 
from the Productive Employment Appropriation Act (PL 
98-8) of 1983. 
5. Includes $955,889 for special recreation use fees and 
$1,743,157 for maintenance and operation of dams and other 
improvements of navigable waters, and $1,892,000 funds provided 
from the Productive Employment Appropriation Act (PL 
98-8) of 1983. 
6. Includes $14,007,193 for new work and $4,005,175 for 
maintenance on previous projects. 
7. Includes $495,763 for maintenance and operation of dams 
and other improvements of navigable waters, and $764,000 
funds provided from the Productive Employment Appropriation 
Act (PL 98-8) of 1983. 
8. Includes $495,763 for maintenance and operation of dams 
and other improvements of navigable waters, and $764,000 
funds provided from the Productive Employment Appropriation 
Act (PL 98-8) of 1983. 
9. Includes $300,000 funds provided from the Productive 
Employment Appropriation Act (PL 98-8) of 1983. 
10. Includes $300,000 funds provided from the Productive 
Employment Appropriation Act (PL 98-8) of 1983. 
11. Includes $33,876 Emergency Relief Funds. 
12. Includes $6,470,000 contributed by the State of Kentucky. 
13. Includes $5,336,932 contributed by the State of Kentucky. 
14. Includes $35,896 public works acceleration funds, and 
$148,000 funds provided from the Productive Employment Appropriation 
Act (PL 98-8) of 1983. 
15. Includes $35,896 public works acceleration funds, and 
$148,000 funds provided from the Productive Employment Appropriation 
Act (PL 98-8) of 1983. 
16. Includes $292,280 funds for special recreation use fees, 
and $198,578 for maintenance and operation of dams and other 
improvements of navigable waters, and $91,000 funds provided 
from the Productive Employment Appropriation Act (PL 98-8) 
of 1983. 
17. Includes $292,280 funds for special recreation use fees, 
and $198,578 for maintenance and operation of dams and other 
improvements of navigable waters, and $91,000 funds provided 
from the Productive Employment Appropriation Act (PL 98-8) 
of 1983. 
18. Includes $51,789 public works funds and $150,000 contributed 
by the State of Tennessee, and $341,000 funds provided 
from the Productive Employment Appropriation Act (PL 98-8) 
of 1983. 
19. Includes $51,789 public works funds and $150,000 contributed 
by the State of Tennessee, and $341,000 funds provided 
from the Productive Employment Appropriation Act (PL 98-8) 
of 1983. 
20. Includes $339,480 funds for special recreation use fees, 
and $198,578 for maintenance and operation of dams and other 
improvements of navigable waters, and $482,000 funds provided 
from the Productive Employment Appropriation Act (PL 98-8) 
of 1983. 
21. Includes $339,480 funds for special recreation use fees, 
and $198,578 for maintenance and operation of dams and other 
improvements of navigable waters, and $482,000 funds provided 
from the Productive Employment Appropriation Act (PL 98-8) 
of 1983. 
22. Includes $46,000 contributed by the Metropolitan Government, 
Nashville, TN. 
23. Includes $46,000 contributed by the Metropolitan Government, 
Nashville, TN. 
24. Includes $260,680 for special recreation use fees, and 
$142,078 for maintenance and operations of dams and other 
improvements of navigable waters, and $40,000 funds provided 
from the Productive Employment Appropriation Act (PL 98-8) 
of 1983. 
25. Includes $260,680 for special recreation use fees, and 
$142,078 for maintenance and operations of dams and other 
improvements of navigable waters, and $40,000 funds provided 
from the Productive Employment Appropriation Act (PL 98-8) 
of 1983. 
26. Includes $66,678 for maintenance and operations of 
dams and other improvements of navigable waters. 
27. Includes $96,920 public works acceleration funds, and 
$880,000 contributed by the State of Kentucky. 
28. Includes $82,048 public works acceleration funds, and 
$198,578 for maintenance and operation of dams and other improvements 
of navigable waters, and $278,780 funds for special 
recreation use fees, and $293,000 funds provided from the 
Productive Employment Appropriation Act (PL 98-8) of 1983. 
29. Includes $82,048 public works acceleration funds, and 
$198,578 for maintenance and operation of dams and other improvements 
of navigable waters, and $278,780 funds for special 
recreation use fees, and $293,000 funds provided from the 
Productive Employment Appropriation Act (PL 98-8) of 1983. 
30. Includes $203,757 for claim paid on initial construction 
of switchyard. 
23-10

NASHVILLE, TN, DISTRICT 
TABLE 23-B AUTHORIZING LEGISLATION 
Project and Work Authorized 
CUMBERLAND RIVER BELOW NASHVILLE 
Jul 13, 1892 Provision made for lock A 
Jun 25, 1910 Provision made for locks B to F, and for dredging below 
lock F. 
Aug 30, 1935 Repairing dams A to F, inclusive, and surmounting same 
with movable crests. 
Jul 24, 1946 Provision of 9-foot channel by the construction of 3 
moderate height dams below Nashville; via, Kuttawa 
(Eureka), Dover, and Cheatham. 
Jun 19, 1952 Provision for hydroelectric power production as a function 
of Cheatham Dam. 
Sep 3, 1954 
Jul 14, 1960 
Construction of Barkley (Lower Cumberland) dam and 
reservoir project for navigation, flood control, hydroelectric 
power, and related purposes in lieu of Kuttawa 
and Dover navigation-only structures. 
Authorized change in alignment of Illinois Central Railroad. 
CUMBERLAND RIVER ABOVE NASHVILLE 
Aug 5, 1886 Provision made for locks and dams; the Secretary of War 
to determine the final plan of improvement. 
Dimensions of the locks fixed in accordance with reports 
of Mar. 30, 1887, and Nov. 25, 1890. 
Mar 2, 1907 Adoption of the report of the Board of Engineers, dated 
Feb. 26, 1906, limiting the lock and dam construction to 
locks and dams 1 to 7, and 21. 
Mar 2, 1919 Provision made for locks and dams 8 to 17. 
Jun 5, 1920 
Jul 3, 1930 
Jun 26, 1934 2 
Authorizes work to proceed in Tennessee without waiting 
for action of local interests in Kentucky. 
Raising dam 1, 3 feet. 
Operation and care of locks and dams provided for with 
funds from War Department appropriations for rivers 
and harbors. 
Jul 24, 1946 Construction of Old Hickory, Cordell Hull (Carthage), and 
Celina Dams above Nashville for navigation and the 
development of power resources. 
Oct 1, 1980 
Jul 3, 1930 
May 18, 1933 
Design and construct flood control measures for communities 
in the Upper Cumberland River basins. 
TENNESSEE RIVER 
Authorized navigable depth of 9 feet from mouth about 
650 miles to Knoxville, Tennessee to be obtained by 
construction of low dams. 
Authorized TVA to construct such dams in the Tennessee 
River as will provide a 9 foot channel. 
Documents 
Annual Report, 1890, p. 
2151 
H. Docs. 758, 60th Cong., 
1st sess.; and 1481, 60th 
Cong., 2d sess.1 
H. Doc. 38, 73d Cong., 1st 
sess. 
H. Doc. 761, 79th Cong., 
2d sess. 
S. Doc. 81, 83d Cong., 2d 
sess. 
H. Doc. 56, 86th Cong., 2d 
sess. 
Annual Report 1884, p. 
1663. 
Annual Report 1888, p. 
1622, and Annual Report 
1892, p. 1933. 
H. Doc. 699, 59th Cong., 
1st sess. 
Rivers and Harbors Committee 
Doc. 10, 63d 
Cong., 2d sess. 
Rivers and Harbors Committee 
Doc. 26, 70th 
Cong., 2d sess. 
H. Doc. 761, 79th Cong., 
2d sess. 
Sec. 202, PL 96-367 
H. Doc. 328, 71st Cong., 
2d sess. 
23-11 
See Section 
in Text 
1. 
Date of 
Authorized Act 
1. 
- --- ~-~-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 23-B 
(Continued) 
AUTHORIZING LEGISLATION 
See Section Date of 
in Text Authorized Act Project and Work Authorized Documents 
9. OHIO RIVER BASIN, NASHVILLE DISTRICT 
Aug 28, 1937 Construct levees, floodwalls, and drainage structures for 
protection of cities and towns in Ohio River Basin. 
Project to be selected by Chief of Engineers with 
approval of Secretary of War at a cost not to exceed 
$24,877,000 for construction. 
Jun 28, 1938 Approved general comprehensive plan for flood control and 
other purposes in Ohio River Basin as may be advisable 
at discretion of Secretary of War and Chief of Engineers, 
and for initiation and partial accomplishment of plan, 
authorized $75 million for reservoirs and $50,300, for 
local flood protection works. 
Aug 18, 1941 
Flood Control Committee 
Doc. 1, 75th Cong., 1st 
sess. 
Flood Control Committee 
Doc. 1, 75th Cong., 1st 
sess. 
Additional $45 million for prosecution of comprehensive 
plan for Ohio River Basin. 
Dec 22, 1944 Additional $70 million for further prosecution of 
comprehensive plan for Ohio River Basin. 
Jul 24, 1946 Additional $125 million for further prosecution of 
comprehensive plan. 
May 17, 1950 
H. Doc. 762, 77th Cong., 
2d sess. 
H. Doc. 506, 78th Cong., 
1st sess. 
Additional $100 million for prosecution of comprehensive 
plan for Ohio River Basin. 
Dec 30, 1963 Additional $150 million for further prosecution of 
comprehensive plan for flood control and other purposes 
in Ohio River Basin. 
Jun 18, 1965 Additional $89 million for further prosecution of 
comprehensive plan for Ohio River Basin. 
Aug 13, 1968 Additional $35 million for further prosecution of 
comprehensive plan for Ohio River Basin. 
Jun 19, 1970 Additional $69 million for further prosecution of 
comprehensive plan for Ohio River Basin. 
Mar 7, 1974 Authorized establishing Big South Fork National River and 
Recreation Area, KY and TN. Total area not to exceed 
125,000 acres. 
Mar 7, 1974 Additional $120 million for further prosecution of 
comprehensive plan for Ohio River Basin. 
TENNESSEE-TOMBIGBEE WATERWAY 
Jul 24, 1946 Construction of waterway to connect above rivers and 
provide a 9 foot channel and minimum bottom width 
of 170 feet in river and canal sections and 150 feet in 
the divide cut, with locks 110 by 600 feet clear inside 
dimensions. 
Subsequent studies determined most practical plan consists 
of channel with bottom width of 300 feet (280 feet in 
divide cut), fewer locks with higher lifts resulted in 
reducing number of lifts from 18 to 10 and reduced 
length from 260 to 253 miles. 
3. 
H. Doc. 6755, 89th Cong., 
1st sess. 
S. 3710, 90th Cong., 2d 
sess. 
H. R. 15166 91st Cong., 
2d sess. 
H. R. 10203 93rd Cong. 
Water Resources Develop. 
Act of 1974 Amended by 
PL 94-587, 94th Cong. 
H. R. 10203 93rd Cong. 
River Basin Monetary 
Authorization Act of 
1974. 
H. Doc. 486, 79th Cong., 
2d sess. 
Page 1343, Part I, FY 
1968 House Hearings. 
1. Contains latest published maps. Included in Public 
Works Administration program Sept. 6, 1933. 
2. Permanent Appropriation Repeal Act. 
23-12 
--

NASHVILLE, TN, DISTRICT 
TABLE 23-C OTHER AUTHORIZED NAVIGATION PROJECTS 
(All Projects not Specifically Identified in Text) 
Project Status 
Caney Fork River, TN 
Clinch River, TN and VA 
Duck River, TN 
Elk River, AL and TN 
French Broad and Little Pigeon Rivers, TN 
Holston River, TN 
Little Tennessee River, TN 
Obey River, TN 
Red River, TN 
South Fork of Cumberland River, KY 
abandoned 
abandoned 
abandoned 
abandoned 
abandoned 
abandoned 
abandoned 
abandoned 
abandoned 
abandoned 
For last Full Cost to Sep 30, 1987 
Report see Operation and 
Annual Report Construction Maintenance 
1895 
1923 
1887 
1904 
1931 
1911 
1888 
1887 
1884 
1892 
$ 27,828 
53,949 
13,000 
4,000 
249,605 
5,714 
5,510 
11,500 
5,000 
11,967 
- 
$ 7,873 
33,554 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(All Projects not Specifically Identified in Text) 
For last Full 
Report see 
Project 
Barbourville, KY 
Chattanooga, TN and Rossville, GA 
Coal Creek and Tributaries (Lake City), TN 
Corbin (Lynn Camp Creek), KY 
Middlesboro (Yellow Creek), KY 
Paint Rock River, AL 
Pineville, KY 
1. Includes $9,950 contributed funds. 
Status Annual Report Constri 
1963 
1949 
1962 
1969 
1949 
1967 
1963 
completed 
completed 
completed 
completed 
completed 
completed 
completed 
Cost to Sep 30, 1987 
Operation and 
uction Maintenance 
$2,088,147 
180,997 
460,134 
567,703 
26,309 
544,173 
1,679,126 
23-13 
TABLE 23-E
~-------- 
-- 1

TABLE 23-1
REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
OTHER AUTHORIZED MULTIPLE-PURPOSE PROJECTS 
F INCLUDING POWER 
Project Status 
Barkley Dam and Lake Barkley, KY and TN beneficial use 
Celina Dam, KY active 
Cheatham Lock and Dam, TN beneficial use 
Cordell Hull Lock and Dam, TN beneficial use 
Old Hickory Lock and Dam, TN beneficial use 
1. Details given under "Cumberland River, TN and KY." See Table 23-H. 
TABLE 23-G 
Project 
Three Islands Reservoir, Ohio 
River Basin, TN 
Middlesboro, Yellow Creek 
Bell County, KY 
Cumberland River above 
Nashville, TN 
Hiwassee River, Polk and 
Bradley Counties, TN 
Annual Report for 
1970 
1923 
Rossview Lake, Tennessee 
and Kentucky 
For last Full 
Report see 
Annual Report 
Date and Authority 
Authorized: FC Act 1938, PL 761, 75 
Cong., 3rd sess.; FC Act 1946, PL 525, 
79th Cong., 2d sess. 
Deauthorized: 5 Aug 1977. 
Authorized: FC Act, Dec 22, 1944, 
PL 534, 78th Congress. 
Deauthorized: 17 Oct 1986. 
Water Resources Development Act of 
1986, PL 99-662, 99th Cong., 2d sess. 
Authorized: River & Harbor Act, 
Aug 5, 1886. 
Deauthorized: 17 Oct 1986. 
Water Resources Development Act of 
1986, PL 99-662, 99th Cong., 2d sess. 
Authorized: River & Harbor Act, 
Aug 14, 1876. 
Deauthorized: 17 Oct 1986. 
Water Resources Development Act of 
1986, PL 99-662, 99th Cong., 2d sess. 
Authorized: FC Act, Jun 28, 1938, 
PL 761, 75th Congress. 
Deauthorized: 17 Oct 1986. 
Water Resources Development Act of 
1986, PL 99-662, 99th Cong., 2d sess. 
Cost to Sep 30, 1987 
Operation and 
Construction Maintenance 
$146,498,644 $61,707,710 1 
222,575 __ 1 
31,682,762 47,136,348 1 
79,874,492 30,228,952 1 
52,266,412 56,960,538 1 
Federal Contributed 
Funds Funds 
Expended Expended 
$111,855 - 
123,065 - 
6,779 - 
23-14 
DEAUTHORIZED PROJECTS 
For last Full 
Report see 
------ ---- 
--

NASHVILLE, TN, DISTRICT 
TABLE 23-H CUMBERLAND RIVER, TN AND KY: PRINCIPLE FEATURES 
(See Section 1 of Text) 
Dam and Reservoir Barkley Cheatham Old Hickory Cordell Hull Celina 
Nearest town 
Miles above mouth of river 
Lock dimensions (feet)1 
Lift at normal pool levels (feet) 
Depths on guardsills at 
minimum pool levels (feet) 
Character of foundation 
Dam: 
Type 
Height 
Length, exclusive of lock section 
(feet) 
Spillway: 
Gross length (feet) 
Net length opening (feet) 
Crest gates: 
Type 
Number 
Size (feet) 
Operating levels at dam 
(feet, mean sea level) : 
Maximum regulated 
Normal operation: 
Full pool 
Minimum pool 
Minimum pool in advance of floods 
Reservoir area (acres) 
Reservoir capacity (acre-feet): 
Flood control 
Power drawdown 
Dead storage 
Total 
Canal: 
Length (miles) 
Bottom width (feet) 
Depth at minimum pool level (feet) 
Power development: 
Number of units 
Generator rating (kilowatts) 
Total installation (kilowatts) 
Kuttawa, KY, 
11 miles. 
30.6 
110 by 800 
57 
11, upper; 
13, lower 
Rock 
Concrete 
gravity and 
earthfill 
157 
9,959 
804 
660 
Tainter 
12 
55 by 50 
375 
359 
354 
346 
93,430 
1,213,000 3,4 
259,000 
610,000 
2,082,000 
Ashland City, 
TN, 9 miles. 
148.7 
110 by 800 
26 
14, upper; 
17, lower 
Rock 
Concrete 
gravity 
75 
800 
480 
420 
Tainter 
7
60 by 27 
385 
382 
7,450 
19,800 7 
84,200 
104,000 
Old Hickory, 
TN, 3 miles. 
216.2 
84 by 400 
60 
14, upper; 
13, lower 
Rock 
Concrete 
gravity and 
earthfill 
98 
3,605 2 
325 
270 
Tainter 
6
45 by 41 
450 8 
442 
27,450 
125,000 5 
63,000 
357,000 
545,000 
Carthage, TN, 
5 miles. 
313.5 
84 by 400 
59 
14, upper; 
13, lower 
Rock 
Concrete 
gravity and 
earthfill 
93 
1,138 2 
291 
225 
Tainter 
5
45 by 41 
508 3 
508 
501 
499 
13,920 
85,600 5,6 
20,500 
204,800 
310,900 
1.75 
400 
11 
4
32,500 
130,000 
3
12,000 
36,000 
4
25,000 
100,000 
3
33,333 
100,000 
23-15 
Celina, TN, 
5 miles. 
385.4 
Rock 
Concrete 
gravity and 
earthfill 
86 
2,298 
290 
250 
Tainter 
5
50 by 37 
564 3 
560 
559 
559 
16,960 
55,950 5 
14,700 
287,300 
357,950 
3
36,000 
- -- 108,000 -1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 23-H CUMBERLAND RIVER, TN AND KY: PRINCIPLE FEATURES 
(Continued) (See Section 1 of Text) 
Dam and Reservoir Barkley Celina Cheatham Cordell Hull Old Hickory 
Percent of project completion 8 - 8 8 8 
Year opened to navigation 1964 - 1952 1973 1954 
Estimated cost 9 $146,500,000 $213,000,000 $31,700,000 $79,874,500 $52,266,400 
1. Clear width and length available for full width. 
2. Exclusive of lock section. 
3. Surcharge. 
4. Normal operation (elev. 375-359) during nonflood season; 
flood control allowance to be increased to 1,472,000 acrefeet 
(elev. 375-354) during season of major floodflows. 
5. Surcharge storage. 
6. During flood season (elev. 508-501); minimum 51,800 
acre-feet (elev. 508-504) with normal operation during nonflood 
season. 
7. Daily pondage allowance; run-of-river project. 
8. Completed for full beneficial use. 
9. Includes recreation facility costs. 
23-16

TABLE 23-I TENNESSEE RIVER 
(See Section 2 of Text) 
Lock Dimensions 
Length Minimum Depth 
Width Avail- Lift on Guard Sills 
of able for Year 
Miles Chain- Full Nor- Maxi- Opened Cost of 
Above Miles from her Width mal mum Lower Upper Character Navi- Kind Type of Each Lock 
Project 1 Mouth Nearest Town (feet) (feet) (feet) (feet) (feet) (feet) of Foundation gation of Dam Construction and Dam 
Kentucky 
Pickwick Landing: 
Auxiliary lock 
Main lock 
Wilson: 
Auxiliary lock 
Main lock 
General Joe Wheeler: 
Auxiliary lock 
Main lock 
Guntersville: 
Auxiliary lock 
Main lock 
Nickajack: 
Auxiliary lock 
Main lock 
Chickamauga 
Watts Bar 
Fort Loudon 
Melton Hill 
(Clinch R.) 
t- 
22.4 0.5 above Gilbertsville, 110 
KY 
206.7 4.4 above Hamburg, 110 
TN 
206.7 4.4 above Hamburg 110 
TN 
259.4 2.9 above Florence, 60 
AL 
259.4 2.9 above Florence, 110 
AL 
274.9 18.4 above Florence 60 
AL 
274.9 18.4 above Florence, 110 
AL 
349.0 9.1 below Guntersville, 60 
AL 
349.0 9.1 below Guntersville, 110 
AL 
424.7 39.4 below Chatta- 110 
nooga, TN 
424.7 39.4 below Chatta- 110 
nooga, TN 
471.0 6.9 above Chatta- 60 
nooga, TN 
529.9 6.8 above Breedenton, 60 
TN 
602.3 1.3 above Lenoir City, 60 
TN 
23.1 22.1 above Kingston, 75 
TN 
600 56 73.3 12.7 11.0 Limestone 
600 55 63.0 
1000 55 63.0 
292 94 100.0 
300 
600 94 100.0 
400 48 51.5 
600 48 51.5 
360 39 45.0 
600 39 45.0 
600 
800 
360 
360 
360 
400 
39 41.0 
39 41.0 
49 53.0 
58 70.0 
72 80.0 
54 60.0 
12.8 10.0 Limestone 
12.8 10.0 Limestone 
11.0 4 11.2 Limestone 
13.0 13.0 Limestone 
13.2 14.7 Limestone 
13.0 13.0 Limestone 
11.8 13.0 Limestone 
12.7 13.0 Limestone 
13.0 13.0 Limestone 
13.0 13.0 Limestone 
13.0 10.0 Limestone 
11.8 12.0 Shale 
11.8 12.0 Limestone 
13.0 13.0 Limestone 
1942 Fixed Concrete and 2 
earthfill 
1937 Fixed Concrete and s 
earthfill 
1984 Fixed Concrete and 8 
earthfill 
1927 Fixed Concrete and $46,973,540 5 
earthfill 
1959 - - 7 
1934 Fixed Concrete and 
earthfill 
1963 Fixed Concrete and 
earthfill 
1937 Fixed - 
1965 Fixed Concrete and 
earthfill 
1967 Fixed Concrete 
Fixed Concrete 
1939 Fixed - 
1941 Fixed Concrete and 
earthfill 
1943 Fixed Concrete and 
earthfill 
1963 Fixed Concrete 
2 
1,796,295 6 
7 r 
3&7
77 
7 
3 &7 
1. H. Doc. 328, 71st Cong., 2d sess., contains table, pp. 98 
and 99, giving pertinent information concerning low dams contemplated 
under 1930 project. Annual Report for 1938, pp. 1218 
and 1219, contains similar information pertaining to low dams 
in addition to existing locks and dams, including those constructed 
or under construction by Tennessee Valley Authority. 
2. Lock and dam constructed by Tennessee Valley Authority. 
3. Lock and dam constructed by Tennessee Valley Authority. 
Design for lock prepared with Corps forces and funds. 
4. Tailwater in canal; flight of 2 locks. 
5. Constructed by the Corps under authority of sec. 124, 
National Defense Act of June 3, 1916 (H. Doc. 1262, 64th 
Cong., 1st sess.). Actual cost of lock and dam. 
6. Actual cost of lock only as constructed by the Corps; 
dams constructed by Tennessee Valley Authority. 
7. Constructed by Tennessee Valley Authority. 
ti

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 23-J TENNESSEE RIVER, TN, AL, AND KY 
TOTAL COST OF EXISTING PROJECTS TO 
(See Section 2 of Text) 
SEP 30, 1987 
Channel Operation & 
Funds New Work Maintenance Maintenance Total 
Regular $2,244,236 $7,829,101 $119,714,674 $129,788,0111,2 
Maintenance - - 11,665 11,665 
Increase of compensation, - 5 - 5 
rivers and harbors, 1919 
(certified claims) 
Total $2,244,236 $7,235,109 $106,792,924 $129,799,6811,2 
1. In addition, surplus property value at $54,336 was tion and care of works of improvement under provisions of 
transferred from the project without reimbursement. Excludes appropriation for such purposes. 
$4,005,175 expended between 1890 and June 30, 1935, on opera- 2. Excludes $14,007,192 previous construction cost. 
TABLE 23-K OHIO RIVER BASIN (NASHVILLE DISTRICT) 
LOCAL PROTECTION PROJECTS
Estimated Cost 
Type of 
Location Protection Federal Non-Federal Total 
Cumberland, KY Channel 520,000 240,000 760,000 1 
Improvement 
1. Deferred. 
TABLE 23-L RESERVOIRS 
Total 
Estimated 
Tributary Basin and Reservoir Stream Cost 
Center Hill Lake, TN Caney Fork River $53,412,0001 
Dale Hollow Lake, TN and KY Obey River 28,167,7001 
J. Percy Priest Dam & Reservoir, TN Stones River 59,038,200 1,2 
Laurel River Lake, KY Laurel River 56,683,200 s 
Martins Fork Lake, KY Martins Fork 20,486,700 
1. Details of this project are in individual report. 
2. Formerly Stewarts Ferry Reservoir. 
3. See "Other authorized multiple-purpose projects." 
23-18

NASHVILLE, TN, DISTRICT 
TABLE 23-M INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 10 of Text) 
Project Date of Inspection 
Barbourville, KY Apr. 1987 and Oct. 1987 
Corbin, KY Apr. 1987 and Oct. 1987 
Lake City, TN Apr. 1987 and Oct. 1987 
Middlesboro, KY (Yellow Creek) Mar. 1987 and Oct. 1987 
Middlesboro, KY (Diversion Canal) Mar. 1987 and Oct. 1987 
Paint Rock River, AL May 1987 and Oct. 1987 
Pineville, KY Mar. 1987 and Oct. 1987 
Spring City, TN May 1987 and Oct. 1987 
TABLE 23-N FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
Flood Control activities pursuant to Section 205 
P.L. 858, 80th Congress, as amended 
Project FY 87 Cost 
Browns Creek, Nashville, TN $ 7,357 
Dry Creek, Goodlettsville, TN 31,184 
Richland and Sugartree Creeks, TN 550 
Whiteoak Creek, Sunbright, TN 22,555 
Whites & Ewing Creeks, TN 16,481 
Gibson Creek, TN 16,771 
Limestone Creek, TN 11,188 
McCrory Creek, TN 2,804 
Roaring Creek, Graysville, TN 7,500 
Emergency Bank Protection (Section 14 of the 1946 
Flood Control Act, P.L. 526, 79th Congress) 
Project FY 87 Cost 
Canton Bridge, Trigg County, KY $205,239 
Crab Orchard Branch, Wise County, VA 52 
Tenn. River, Downtown Airport, Knoxville, TN 118,004 
Lewis Branch, Houston County, TN 109,269 
Paris Landing, TN 140,593 
Sheffield, AL City Dock 200,427 
Soddy Daisy, TN Repair 35,070 
Paint Rock River, Jackson, TN 8,500 
23-19

LOUISVILLE, KY. DISTRICT * 
This district comprises a portion of southwestern Ohio, Rivers) from mile 438 (below Pittsburgh) immediately 
west central Kentucky, a small portion of north central upstream from Foster, KY. to mouth. 
Tennessee, Indiana except northern part, and 
southeastern Illinois except Cairo-Mounds-Mound City All cost and financial statements for projects are listed 
area, all included in drainage basin of Ohio River and its at the end of this chapter. All other tables are referenced 
tributaries (exclusive of Tennessee and Cumberland in text and also appear at the end of this chapter. 
IMPROVEMENTS 
Navigation - Locks and Dams Page 
1. Construction of Locks and Dams, 
Ohio River.............. ........... 24-2 
2. Green and Barren Rivers, KY............. 24-2 
3. Kentucky River, KY....................24-2 
4. Open Channel Work, Ohio River.......... 24-3 
5. Other Authorized Navigation 
Projects ........ ........................ 24-3 
6. Navigation Work Under Special 
Authorization ........................ .. 24-3 
Flood Control - Local Protection 
7. Dayton, KY ............................ 24-3 
8. Evansville, IN..........................24-3 
9. Levee Unit No. 5, 
Wabash River, IN................. ..... 24-4 
10. Mason J. Niblack Levee, 
Wabash River, IN.......................24-4 
11. Mill Creek, OH.........................24-4 
12. Southwestern Jefferson 
County, KY ............................ 24-5 
Flood Control - Reservoirs 
13. Barren River Lake, KY..................24-5 
14. Brookville Lake, IN ...................... 24-5 
15. Buckhorn Lake, KY ...................... 24-6 
16. Caesar Creek Lake, OH..................24-6 
17. Cagles Mill Lake, IN.................... 24-6 
18. Carr Fork Lake, KY....................24-7 
19. Cave Run Lake, KY ...................... 24-7 
20. Cecil M. Harden Lake, IN................. 24-7 
21. Clarence J. Brown Dam 
& Reservoir, OH.........................24-8 
22. Green River Lake, KY...................24-8 
23. Huntington Lake, IN..................... 24-8 
24. Mississinewa Lake, IN...................24-9 
25. Monroe Lake, IN........................ 24-9 
26. Nolin Lake, KY........................24-9 
27. Ohio River Basin 
(Louisville Dist.)........................24-10 
28. Patoka Lake, IN.......................24-10 
29. Rough River Lake and Channel 
Improvement, KY......................24-10 
30. Salamonie Lake, IN....................24-11 
31. Taylorsville Lake, KY..................24-11 
Page 
32. Wabash River Basin....................24-11 
33. West Fork of Mill Creek Lake, OH ........ 24-12 
34. William H. Harsha Lake, OH............24-12 
35. Inspection of Completed Flood 
Control Projects........................ 24-12 
36. Other Authorized Flood Control 
Projects ...... ......................... 24-13 
37. Flood Control Works Under 
Special Authorization.................... 24-13 
General Investigations 
38. Surveys .............................. 24-13 
39. Collection and Study of Basic Data ....... 24-13 
40. Preconstruction Engineering and 
Design ................... ............ 24-13 
Tables 
Table 24-A Cost and Financial 
Statement.....................24-14 
Table 24-B Authorizing Legislation.......... 24-18 
Table 24-C Other Authorized Navigation 
Projects.......................24-19 
Table 24-D Not Applicable 
Table 24-E Other Authorized Flood 
Control Projects................24-20 
Table 24-F Not Applicable 
Table 24-G Deauthorized Projects...........24-22 
Table 24-H Principal Features of Green 
and Barren Rivers and Kentucky 
River Navigation Systems........ 24-23 
Table 24-I Ohio River Basin - Total 
Cost of Basin Plan..............24-24 
Table 24-J Wabash River Basin - Total 
Cost of Basin Plan..............24-28 
Table 24-K Inspection of Completed 
Flood Control Projects...........24-29 
Table 24-L Flood Control Work Under 
Special Authorization............ 24-31 
24-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation - Locks and Dams 
1. CONSTRUCTION OF LOCKS AND 
DAMS, OHIO RIVER 
For report on this improvement, see the heading under 
Ohio River. 
2. GREEN AND BARREN RIVERS, 
KY. 
Location. Green River rises in Casey County, KY, 
flows northwesterly 370 miles, and empties into Ohio 
River about 8 miles above Evansville, IN. Barren River 
rises in Monroe County, KY, flows northwesterly 130 
miles, and empties into Green River 1/2 mile above Lock 
4 and 149.5 miles above mouth of Green River. 
Existing project. Six locks and dams on Green River 
and one on Barren River to give, with channel work in 
pools of dams, a navigable depth of 9 feet and width of 
200 feet from Ohio River to mile 103 Green River, 3.2 
miles upstream from Paradise, KY; a navigable depth of 
5.5 feet from mile 103 Green River to Mammoth Cave, 
KY, mile 197.8 Green River, and from mouth of Barren 
River mile 149.5 Green River, to Bowling Green, KY, mile 
30.1, Barren River. 
Fluctuations in stage vary considerably at different 
locks. At Lock 3, Green River, ordinary high stages are 
from 12 to 15 feet above pool level, and at Lock 1, Barren 
River, from 7 to 10 feet above pool. Maximum stages of 
record are 34 feet above normal pool stage at Lock 3, 
Green River, and 29 feet at Lock 1, Barren River, obtained 
during floods of 1937 and 1913, respectively. (See Table 
24-B for authorizing legislation and Table 24-H for principal 
features of the locks and dams.) 
Local cooperation. Fully complied with. 
Terminal facilities. Coal handling facilities located 
on the Green River between miles 81.5 and 108.1 near 
South Carrollton, Rockport, Paradise and Rochester, 
Kentucky, are considered adequate for existing 
commerce. 
Operations during fiscal year. Consisted of operation 
and maintenance of Locks and Dams 1 and 2, Green 
River, and removal of shoals, snags, and slides as required 
to maintain adequate channel for existing traffic between 
mouth of Green River and Dam 3 at mile 108.5 Green 
River. Maintenance: Routine maintenance was 
performed. 
Locks and Dams 1 and 2, Green River, are in good condition. 
Lock and Dam 3, Green River, and Lock and Dam 
1, Barren River are in fair condition, and Lock 4, Green 
River, is in poor condition. Dam 4, Green River, failed 
May 24, 1965, when 120 feet washed out. Breach later 
widened, and repairs were deferred pending completion 
of survey report for navigation on Green River. Pool of 
Dam 1, Barren River, is maintained for local small boat 
use, but navigation through lock is suspended because of 
loss of lower pool. Operation activity was discontinued at 
Lock 4 Green River and Lock and Dam 1 Barren River 
in January 1974 and at Lock 3, Green River in September 
1981. The residences and associated buildings and 
certain real estate at Lock 4 Green River and Lock and 
Dam 1 Barren River were disposed of in January 1975. 
Operation of Locks 5 and 6, Green River, was discontinued 
August 1951, as they were no longer used by river 
traffic. Controlling project depth in lower 103 miles of 
Green River is 9 feet; controlling depth from mile 103 to 
Bowling Green, KY, is 5.5 feet. Under permit issued by 
District Engineer on August 20, 1963, private interests 
dredged channel of Green River to extend 9-foot depth to 
coal loading teminal at mile 105.7. Channel of Green 
River above Lock 3 is no longer maintained. 
3. KENTUCKY RIVER, KY 
Location. Formed by confluence of its North and Middle 
Forks about 4 miles east of Beattyville in east central 
Kentucky, (South Fork joins the main stream at that 
location), flows northwesterly and empties into Ohio River 
at Carrollton, KY, mile 545.8 below Pittsburgh, PA. 
Existing project. Provides for 14 locks and fixed dams 
to give, in connection with improvement of Ohio River, 
slack water navigation of 6 feet minimum depth from 
Ohio River to places on the three forks that are short 
distances above Beattyville, KY. Length of 6-foot-depth 
project on main stem of Kentucky River is 258.6 miles 
to confluence of Middle and North Forks. Cost of completed 
new work is $4,176,749. River frequently rises to 
35 feet or higher. Extreme height at Lock 1 due to flood 
backwater from Ohio River is 60.3 feet, while extreme 
floods reach height of 47.6 feet at Lock 4, and 35.5 feet 
at Lock 14. At some intermediate locks extreme height 
of floods exceeds 40 feet. All flood heights refer to upper 
pool gages. Existing project was adopted by 1879 River 
and Harbor Act (H. Ex. Doc. 47, 45th Cong., 3d Sess., and 
Annual Report, 1879, p. 1398). Operation and care of locks 
and dams were included in project July 1, 1935, under 
provision of Permanent Appropriations Repeal Act of 
June 26, 1934. (See Table 24-H for principal features of 
the locks and dams.) 
On December 19, 1976 the lock operation schedules for 
commercial traffic and recreational craft on the Kentucky 
River System were reduced from continuous 24-hour yearround 
operation to two shift year-round operation of Locks 
1 through 4, intermittent daily operation of Locks 5 
through 10, and intermittent operation five days weekly 
of Locks 11 through 14. Since that time the hours for 
operation of Locks 5 through 14 have been reduced in 
several increments. On 1 October 1981 Locks 5 through 
14 were closed to traffic and placed in caretaker status. 
Locks 5, 6, 8, 9, and 10 were in operation for 15 weekends 
during fiscal year 1982 and was again closed at the end 
of this period. Locks 5 through 14 were leased to the State 
of Kentucky on 21 May 1985. The State of Kentucky plans 
to operate these locks on weekends during the summer 
boating seasons. During the fiscal year Locks 1 through 
4 continued a two shift, year-round operation. 
Licenses. Federal Regulatory Commission License 
No. 539, to Kentucky Utilities Co., at Dam 7, Kentucky 
River, Annual charge, $4,400; total collections through 
September 30, 1987, $275,605. 
24-2

LOUISVILLE, KY. DISTRICT 
Terminal facilities. Facilities for bulk commodities 
and gasoline are considered adequate for existing traffic. 
Operations during fiscal year. Consisted of operation 
and maintenance of Locks and Dams 1 through 4 and 
removal of shoals, snags, and slides as required to maintain 
an adequate channel for existing traffic between 
mouth of river and Dam 5 at mile 82.2 Kentucky River. 
Maintenance: Contract for miter gate repair and guard 
chain replacement was completed. Routine maintenance 
was performed. 
Existing project was completed in 1917. Work 
accomplished was rehabilitation of the five old State locks 
and dams and construction of new Locks and Dams 6 to 
14 inclusive. Repairs have been made to deteriorated 
locks and dams as required to keep locks in operation and 
maintain pool levels above dams except in extreme dry 
weather, when some pools fall below normal levels, details 
in Annual Reports for 1963,1964 and 1965. Channel work 
was performed as required to provide for existing river 
traffic. Controlling navigable depth in length of river 
covered by existing project was 6 feet at end of fiscal year. 
4. OPEN CHANNEL WORK, 
OHIO RIVER 
For report on this improvement, see this heading under 
Ohio River. 
5. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See Table 24-C. 
6. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
None. 
Flood Control - Local Protection 
7. DAYTON, KY 
Location. In Campbell County, KY, on left bank of 
Ohio River from mile 467.0 to mile 469.2 and across the 
river from Cincinnati, Ohio. (See U. S. Geological Survey 
map of Newport, KY.) 
Existing project. Provides for construction of 8,170 
feet of levee, two pumping stations with gravity drainage 
structures, and major relocations of storm and sanitary 
sewers serving the community. Cost of the completed 
project is $13,117,300 Federal and $2,013,000 
non-Federal. 
Local cooperation. Section 3 of the Flood Control Act 
of June 22, 1936 applies. Formal assurances of cooperation 
were executed by City of Dayton, KY, on November 
1969. Levee, floodwall, and pumping plants were transferred 
to the City of Dayton for operation and maintenance 
December 30, 1982. 
Operations during fiscal year. Operation by local interests 
for flood control prevented no damages during 
1987 flood season. 
8. EVANSVILLE, IN 
Location. In Vanderburgh County, IN, on right bank 
of Ohio River, 792.2 miles below Pittsburgh, PA. (See U.S. 
Geological Survey map of Evansville-South, IN.) 
Existing project. Construction of a system of levees 
and concrete floodwalls, together with pumping plants for 
disposal of interior drainage, at Evansville. For further 
details, see Annual Report for 1962, page 1127. Project 
will provide protection for City of Evansville, IN, against 
Ohio River floods equal to 1937 flood (maximum of record), 
with a 3-foot freeboard. Estimated total cost of new work 
(1987) is $49,500,000 Federal, and $7,630,000 non- 
Federal. Existing project selected for construction under 
general authorization for Ohio River Basin in 1937 Flood 
Control Act. Howell Section, Unit 2, was reclassified from 
the "active" category to the "inactive" category July 7, 
1977 based on current studies that indicated this part of 
the project is not economically justified. 
Local cooperation. Section 3 of Flood Control Act of 
June 22, 1936, as amended, applies. Fully complied with 
for Howell Unit 1 and Knight Township sections. 
Assurances for Pigeon Creek Section, Unit 1, were executed 
February 11, 1963. Authorizations-of-entry for 
Pigeon Creek Section, Unit 2, Parts 1 and 2 have been 
furnished. 
Operations during fiscal year. Engineering and 
design studies continued. Contract for design of North 1st 
Avenue, Diamond Avenue and Stringtown Road pumping 
plants advanced to about 45% completion. Plans and 
specifications for U.S. Highway 41W Pump Plant and 
Power Service for 1st Avenue, Diamond Avenue and 
Stringtown Road advanced to about 55% and 90% completion, 
respectively. Flood damages estimated at $21,000 
were prevented during the 1987 flood season. 
Knight Township, Howell, Unit 1 and Pigeon Creek, 
Unit 1 Sections are complete. Howell Section, Unit 2, is 
in the "inactive" category. Construction of Pigeon Creek 
Section, Unit 2, was started in April 1974 and is about 
45 percent complete. General Design Memorandum and 
Supplement on Pigeon Creek Unit 2, and Design 
Memorandum and plans and specifications for Delaware, 
Dresden and North 6th Avenue pumping plants are 
approved. Design Memorandum for North 1st Avenue, 
Diamond Avenue, and Stringtown Road pumping plants 
is complete. Project is about 58 percent complete overall. 
24-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
9. LEVEE UNIT NO. 5, WABASH 
RIVER, IN 
Location. In Gibson and Posey Counties, IN, on left 
bank of Wabash River, from 58 to 94.5 miles above mouth. 
Existing project. Provides for construction of 41.9 
miles of earth levee, drainage structures, pumping plants, 
together with alterations to three railroad bridges crossing 
Wabash River. Project provides protection for 44,000 
acres of farm land and towns of Lyle, Skelton, and Griffin, 
IN, against a flood equal to that expected on an 
average of 7 times in each 100-year period. Estimated 
total cost of new work (1987) is $8,355,500 of which 
$905,500 is non-Federal cost for lands and damages and 
road utility relocations. Project was authorized by Flood 
Control Acts of 1936 and 1946. 
Local cooperation. Section 3, Flood Control Acts of 
June 22, 1936, applies. Assurances were executed by 
Superintendent of Levee District on January 8, 1962. 
Completed portions of project (levees) were transferred to 
the Levee District for operation and maintenance 
October 15, 1969. Emerson Ditch pumping plant was 
transferred to the Levee District for operation and 
maintenance November 24, 1975. 
Operations during fiscal year. Construction contract 
for Coffee Bayou pumping plant and entire project 
were completed. Flood damages estimated at zero were 
prevented during the 1987 flood season. 
10. MASON J. NIBLACK LEVEE, 
WABASH RIVER, IN 
Location. In Knox and Sullivan Counties, IN, on left 
bank of Wabash River, between miles 134.8 and 151.8 
above mouth. 
Existing project. Construction of two sections of 
earth levee totaling 18 miles in length, three pumping 
plants for disposal of interior drainage, and other 
necessary appurtenances. Length of protection, including 
high ground between the two levee sections, is 18.9 miles 
long. Project protects 15,900 acres of agricultural land 
against a flood equal to that expected to occur 7 times in 
a 100-year period. Cost of the completed pumping plants 
was $2,782,905 all Federal cost and cost of the completed 
levee was $1,663,912 of which $109,200 was non-Federal 
cost and $1,554,712 was Federal cost. The levee project 
was authorized by the 1946 Flood Control Act; pumping 
facilities were authorized by the 1968 Flood Control Act. 
Local cooperation. Section 3 of the Flood Control Act 
of June 22, 1936, as amended, applies. Fully complied 
with for levees and pumping plants. 
Operations during fiscal year. Operation by local 
interests for flood control prevented no damages during 
1987 flood season. 
Construction of levees complete and transferred to 
Mason J. Niblack Levee District in January 1965 for 
operation and maintenance. Construction of the pumping 
plants and channel improvements complete and 
transferred to the local sponsor in May 1980. 
11. MILL CREEK, OH 
Location. Proposed project is located along the 
18-mile length of Mill Creek and three-fourths mile length 
of East Fork in Hamilton County, OH. Lower Mill Creek 
is in the commercial and industrial heart of the 
Cincinnati metropolitan area in the southwestern portion 
of the State. 
Existing project. Eighteen miles of channel improvement, 
2 miles of levees, two pumping plants, modification 
of 29 bridges, and the addition of two pumping units 
at the present Mill Creek Barrier Dam, located near the 
Ohio River, are included in the project. Acquisition and 
development with appropriate landscaping of 620 acres 
along the creek will be provided for high-density urban 
oriented recreational use. Estimated cost of new work 
(1987) is $187,695,000, of which $41,076,000 is 
non-Federal. 
Local cooperation. Section 3, Flood Control Act of 
1936 as amended, applies. In addition, local interests 
must provide without cost to the United States all 
modifications and relocations of buildings, utilities, street 
and foot bridges, sewers, and related and special facilities 
as necessary for construction of project; prevent encroachment 
on improved channels and on ponding areas which 
would impair capacities; at least annually inform interests 
affected as to degree of protection afforded by project, 
and provide guidance and leadership in preventing 
unwise and uneconomical development of flood plain 
areas by encouraging prudent use of floodproofing, land 
regulation planning, or other flood plain management 
techniques to reduce flood losses. Further, with respect 
to the recreational aspects of the project, local interests 
are required to furnish assurances that they will, if 
necessary, pay or contribute in kind, a portion of the cost 
of recreational facilities which, when added to the cost 
of recreation land, would amount to at least 50 percent 
of the total first cost of the recreation land and recreational 
facilities, and assure access to the recreation 
facilities to all on equal terms. An assurance agreement 
covering local cooperation requirements for the project 
consistent with Section 221 of the 1970 Flood Control Act 
and the Uniform Relocation Assistance and Real Property 
Acquisition Policies Act of 1970 was executed by the 
Millcreek Valley Conservancy District February 6, 1975, 
and for the Secretary of the Army March 28, 1975. A 
recreation cost sharing contract was executed by the 
Conservancy District February 25, 1975, and approved 
by the Secretary of the Army May 28, 1975. 
Operations during fiscal year. Engineering studies 
continued. Construction contract for channel Section 2 
was advanced to completion. Contract for Railraod Relocation 
and Construction of Channel Section 4A and Section 
3 to Center Hill Road was advanced to 100 percent completion. 
Contract for construction of Section 8 (Barrier 
24-4

LOUISVILLE, KY. DISTRICT 
Dam) was awarded in December 1986 and advanced to 
4 percent completion. Flood damages estimated at $67,000 
were prevented during the 1987 flood season. 
Design Memoranda, Hydrology & Hydraulics, Concrete 
Aggregate and Stone Protection Sources, and Railroad 
Relocations, General Design Memoranda, Phase I and 
Phase II, Design of Channel - Sections 5 and 7 are complete. 
Construction of channel and levee - Sections 2, 3 
and 7A, Phase I, are complete. Project is about 32 percent 
complete overall. 
12. SOUTHWESTERN JEFFERSON 
COUNTY, KY 
Location. In Jefferson County, KY, on left bank of 
Ohio River from mile 616 to 628.6. 
Existing project. Provides for the construction of 
68,500 feet of levee, 1,550 feet of concrete wall, four 
pumping plants, and other necessary appurtenances. 
Project will provide protection fo 24,100 acres against 
Ohio River floods equal to 1937 flood of record with 3-foot 
freeboard. Estimated cost of new work (1987) is 
$67,585,000, of which $57,668,000 is Federal, and 
$9,917,000 is non-Federal. Project was authorized under 
Flood Control Act of August 1968. Recreation as a project 
purpose has been deferred until such time as a water 
quality problem on Pond Creek is corrected. 
Local cooperation. Section 3 Flood Control Act of 
1936 as amended applies. In addition, local interests must 
agree to administer project land and water areas for 
recreation and fish and wildlife enhancement; and to pay, 
contribute in kind or repay (which may be through user 
fees) with interest, one-half of the separable first cost of 
the project allocated to recreation and fish and wildlife 
enhancement; and bear all costs of operation, 
maintenance and replacement of lands and facilities for 
recreation and fish and wildlife enhancement. Jefferson 
County Fiscal Court expressed intent to fulfill requirement 
by resolution dated April 4, 1967. Formal 
assurances of local cooperation for the flood protection portion 
of the project was executed by resolution of Jefferson 
County Fiscal Court, adopted September 17, 1971, and 
assurances for the recreation portion of the project were 
executed by similar resolution, adopted September 14, 
1971. Authorization-of-entry for levee and floodwall sections 
1, 2, 3, 4, 4A, 5 and Pond Creek Pump Plant have 
been furnished. 
Operations during fiscal year. Engineering studies 
continued. Contract for Pond Creek Pumps and Motors, 
awarded in May 1985, was advanced to 69 percent completion. 
Contract for Levee Section 5 and Pond Creek 
Pumping Station awarded in September 1985 was advanced 
to 69 percent completion Contract for Remedial 
Work for Railroad Closure at Levee Section 5 was awarded 
in September 1986. 
Engineering studies are about 98 percent complete. 
Construction of levee and floodwall Sections 1, 2, 3,4 and 
4A; railroad closure at Section 4; electric service for 
gatewells; Riverport and Upper and Lower Mill Creek 
pumping plants; rehabilitation of pump stations; and 
relocation of Texas Gas pipeline are complete. Project is 
85 percent complete overall. 
Flood Control - Reservoirs 
13. BARREN RIVER LAKE, KY 
Location. Dam is on Barren River, 79.5 miles above 
its confluence with Green River and 10 miles northeast 
of Scottsville, KY. At flood control pool reservoir extends 
upstream about 40 miles in Barren and Allen Counties, 
KY. (See U.S. Geological Survey map of Lucas, KY.) 
Existing project. A reservoir for flood control and 
allied purposes. Dam is rolled earth and rockfill, 146 feet 
high and 3,970 feet long, with gate-controlled outlet works 
and uncontrolled open-cut spillway. Total storage capacity 
is 815,200 acre-feet (768,000 for flood control and 46,600 
for water supply storage). For further details, see page 
1125 of Annual Report for 1962. Cost of the completed 
project is $27,479,717 including $2,335,055 Federal funds 
and $108,418 non-Federal funds for construction of recreation 
facilities under the completed projects program. Project 
was authorized by Flood Control Act of 1938. 
Local cooperation. None required by authorizing act. 
Under provision of Water Supply Act of 1958, contract 
with City of Glasgow for water supply storage was 
approved by Secretary of Army on October 4, 1965. Terms 
require City to pay $23,433, which is project cost allocated 
to water storage plus capitalized prepayment of proportionate 
share of operation, maintenance, and major 
replacement costs. A contract, with the Commonwealth 
of Kentucky for development of additional campsites, 
shoreline protection and breakwater extension at Barren 
River Lake State Park under the cost-sharing category 
of the completed projects program was approved by the 
Secretary of the Army November 4, 1977. 
Operations during fiscal year. New work: None. 
Maintenance: Contract for control tower maintenance and 
bulkhead modification continued. A contract for riprap 
repairs was awarded in November 1986. Routine 
maintenance was performed. Operation for flood control 
during the 1987 flood season prevented damages of 
$1,269,000. 
Construction started in March 1960 and all major construction 
and relocation items were completed in October 
1964. Project was placed in operation in March 1964. 
Land acquisition is complete. 
14. BROOKVILLE LAKE, IN 
Location. Damsite is on East Fork of Whitewater 
River, 2.4 miles above confluence with West Fork, and 
about 1-1/2 miles north of Brookville, Indiana. The reservoir 
lies in Franklin and Union Counties, Indiana. (See 
U.S. Geological Survey map of Brookville, IN.) 
Existing project. A reservoir for flood control and 
allied purposes. Dam is earthfill, 182 feet high and 3,004 
feet long, with gate-controlled outlet works, and uncontrolled 
open spillway. Total storage capacity is 359,600 
acre-feet (214,700 for flood control, 89,300 for water supply, 
and 35,500 for conservation). A minimum pool of 
24-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
20,100 acre-feet is maintained. Estimated cost of new 
work (1987) is $45,243,922 of which $37,804,367 is 
Federal cost and $7,439,555 is non-Federal contribution 
for water supply storage. Project was authorized by 1938 
Flood Control Act. 
Local cooperation. None required by authorizing act. 
Contract with State of Indiana for water supply storage 
under provisions of Water Supply Act of 1958 was 
approved by Secretary of Army, August 5, 1965. Under 
terms of contract, State paid initial costs allocated to 
water supply feature of project plus capitalized prepayment 
of proportionate share of operation and maintenance 
costs. 
Operation during fiscal year. New work: None. 
Maintenance: Installation of hydropower unit is complete 
but is not in operation pending finalization of contract 
with Southeastern Power Administration for purchase of 
surplus power. Routine maintenance was performed. 
Operation for flood control during the 1987 flood season 
prevented damages of $60,000. 
Construction was started in November 1965 and project 
was placed in operation January 1974. Construction 
and land acquisition are complete. 
15. BUCKHORN LAKE, KY 
Location. Dam is on Middle Fork of Kentucky River, 
43.4 miles above mouth, and 0.5 mile upstream'from 
Buckhorn, Perry County, KY. Reservoir extends 
upstream about 34 miles and lies in Leslie and Perry 
Counties, Kentucky. (See U.S. Geological Survey map of 
Buckhorn, KY.) 
Existing project. A reservoir for flood control and 
recreation. Dam is earth and rockfill type, with gate controlled 
outlet works. Total storage capacity is 168,000 
acre-feet, of which 157,600 is for flood control. For further 
details, see page 1120 of Annual Report for 1962. 
Cost of completed new work is $11,766,206 including 
$386,707 for construction of recreation facilities under the 
completed projects program. Existing project was 
authorized by general authorization for Ohio River Basin 
in 1938 Flood Control Act. 
Local cooperation. Department of Parks of the Commonwealth 
of Kentucky has undertaken management of 
lands and recreational facilities in accordance with license 
granted by Secretary of the Army on June 29, 1962. 
Operations during fiscal year. New work: None. 
Maintenance: Routine maintenance was performed. 
Operation for flood control during the 1987 flood season 
prevented damages of $121,000. 
Construction started in September 1956 and project was 
placed in operation in August 1960. All construction and 
land acquisition is complete. 
16. CAESAR CREEK LAKE, OH 
Location. Damsite is on Caesar Creek, about 3.0 
miles above its confluence with Little Miami River, in 
Warren County, OH, about 3.5 miles southeast of 
Waynesville, OH, and 10.5 miles northeast of Lebanon, 
OH. Reservoir lies in Warren, Clinton, and Green 
Counties, OH. (See U.S. Geological Survey map of 
Oregonia, OH.) 
Existing project. Provides for construction of a reservoir 
for flood control and allied purposes. It includes an 
earth and rockfill dam, four saddle dams, outlet works 
and an uncontrolled saddle spillway. Total storage capacity 
of reservoir is 242,200 acre-feet, of which 148,500 acrefeet 
is reserved for flood control storage. Estimated cost 
of new work (1987) is $64,781,000 including $5,037,000 
non-Federal reimbursement for water supply storage. Existing 
project was authorized by general authorization for 
Ohio River Basin in 1983 Flood Control Act. 
Local cooperation. None required. However, the 
State of Ohio requested inclusion in the project of storage 
for future municipal and industrial water supply uses. 
Contract with State of Ohio for water supply storage 
under provisions of Water Supply Act of 1958, as amended, 
was approved by Secretary of the Army, May 20, 1970. 
Under terms of contract, State will reimburse the Federal 
Government for costs allocated to water supply storage 
over a period not to exceed 50 years after use of this 
storage is initiated plus estimated annual amount for cost 
of operation, maintenance and major capital replacements 
required for the water supply facilities. 
Operations during fiscal year. New work: None. 
Maintenance: Routine maintenance was performed. Flood 
damages estimated at $398,000 were prevented during 
the 1987 flood season. 
Construction was started in January 1968 and the project 
was placed in operation January 1978. Land acquisition 
is complete. All relocation and construction features 
are complete. Project is about 99 percent complete overall. 
17. CAGLES MILL LAKE, IN 
Location. Dam is on Mill Creek, 2.8 miles above its 
confluence with Eel River, in Putnam County, IN, and 
about 25 miles east of Terre Haute, IN. Reservoir extends 
upstream about 11 miles and is in Putnam and Owen 
Counties, IN. (See U.S. Geological Survey map of Poland, 
IN.) 
Existing project. A reservoir for flood control and 
recreation. Dam is earth and rockfill embankment. Total 
storage capacity is 228,100 acre-feet, of which 201,000 
acre-feet are for flood control. For details see Annual 
Report for 1962, page 1136. Cost of completed new work 
is $4,263,184 including $155,416 Federal funds and 
$106,813 non-Federal funds for construction of recreation 
facilities under the completed projects program. Existing 
project was selected for construction under general 
authorization for Ohio River Basin in 1938 Flood Control 
Act. 
Local cooperation. None required. State of Indiana 
has undertaken development and management of recreation 
facilities for use of the public in reservoir area in accordance 
with license granted by Secretary of the Army 
on January 17, 1952. A contract with the Indiana Depart- 
24-6

LOUISVILLE, KY. DISTRICT 
ment of Natural Resources for expanding the boat ramp 
and parking area at Site 3, Lieber State Park, under the 
cost sharing category of the completed projects program 
was signed by the State of Indiana on August 26, 1981 
and approved by the Deputy Chief of Engineers on 
March 26, 1982. 
Operations during fiscal year. New Work: None. 
Maintenance: Routine maintenance was performed. 
Operation for flood control during the 1987 flood season 
prevented damages of $4,816,000. 
Construction started in July 1948 and completed in 
June 1953. 
18. CARR FORK LAKE, KY 
Location. Damsite is 8.8 miles above mouth of Carr 
Fork, a tributary of North Fork of Kentucky River, 16 
miles upstream from Hazard, KY. The reservoir lies entirely 
within Knott County. (See U.S. Geological Survey 
maps of Carrie and Vicco, KY.) 
Existing project. Provides for construction of a reservoir 
for flood control and allied purposes. Dam is rock and 
earth fill with impervious core, 720 feet long and 130 feet 
high, with uncontrolled open cut spillway through left 
abutment. Outlet works has two control gates and 8-foot 
diameter conduit to stilling basin. Total storage capacity 
is 47,700 acre-feet (31,600 for flood control and 4,300 
for water quality control). A higher level seasonal pool 
for recreation is provided. Estimated Federal cost of new 
work (1987) is $50,854,800 including $76,700 for recreation 
facilities under the completed projects program. Project 
was authorized by the 1962 Flood Control Act. 
Local cooperation. None required for reservoir 
project. Division of Flood Control and Water Usage of 
Commonwealth of Kentucky gave assurance that encroachments 
on downstream channel capacity will be 
prevented. 
Operations during fiscal year. New work: Real 
estate administrative action required for condemnation 
of remaining tracts was continued. Maintenance: Contract 
work was completed on modification of hydraulic 
system. Routine maintenance was performed. Operation 
for flood control during the 1987 flood season prevented 
damages of $304,000. 
Condition at end of fiscal year. Project was placed 
in operation January 1976. Construction started in 
January 1966 is complete. All land required for the project 
has been acquired; however, a number of condemnation 
actions remain unsettled. 
19. CAVE RUN LAKE, KY 
Location. Damsite is on Licking River, about 4 miles 
upstream from U. S. Highway 60 near Farmers, KY, and 
7 miles southwest of Morehead, KY. Reservoir will be in 
Rowan, Bath, Morgan, and Menifee Counties, KY. (See 
U.S. Geological Survey maps of Salt Lick and Morehead, 
KY.) 
Existing project. Plan provides for construction of a 
reservoir for flood control and allied purposes. Dam is rolled 
earthfill, with gate controlled outlet works and uncontrolled 
open spillway. Total storage capacity is 614,700 
acre-feet (438,500 for flood control and 28,300 for water 
quality control). Estimated Federal cost of new work 
(1987) is $114,826,300 of which $35,213,000 is U. S. Forest 
Service cost. Project was authorized by Flood Control Acts 
of June 22, 1936 and June 28, 1938. 
Local cooperation. None required. 
Operations during fiscal year. New work: None. 
Real estate administrative action required for acquisition 
of remaining tracts was completed. Contract for Zilpo 
Recreation Buildings and Paving was awarded in 
November 1986 and advanced to completion. 
Maintenance: Routine maintenance was performed. 
Operation for flood control during the 1987 flood season 
prevented damages of $834,000. 
Project has been in operation since February 1974. 
Construction was started in June 1965 and is about 93 
percent complete overall. Land acquisition is complete. 
All relocation and construction features are complete 
except recreation facilities. 
20. CECIL M. HARDEN LAKE, IN 
Location. Dam is on Raccoon Creek, 32.4 miles above 
its confluence with Wabash River, and 25 miles northeast 
of Terre Haute, IN. At flood control pool, reservoir extends 
upstream about 15 miles in Parke and Putnam Counties, 
Indiana. (See U. S. Geological Survey Map of Mansfield, 
IN.) 
Existing project. A rolled earth dam and reservoir, 
for flood control and allied purposes. Total storage 
capacity is 132,800 acre-feet of which 116,600 acre-feet 
are for flood control. For details, see Annual Report for 
1962, page 1132. Cost of completed new work is 
$6,987,807 made up of $6,260,134 for the initial project 
and $373,678 Federal cost and $353,995 non-Federal 
contribution in kind for recreation facilities under the 
completed projects program. Project was selected for construction 
under general authorization for Ohio River 
Basin in 1938 Flood Control Act. Project name was changed 
from Mansfield Lake to Cecil M. Harden Lake by 
Public Law 93-521, December 14, 1974. 
Local cooperation. State of Indiana has undertaken 
management of lands and recreational facilities in 
accordance with license granted by Secretary of the Army 
on April 19, 1961. A contract with the Indiana Department 
of Natural Resources, approved by the Secretary of 
the Army in May 1974, provided for that agency to design 
and construct certain additional recreation facilities at 
Cecil M. Harden, Huntington, Mississinewa, Monroe and 
Salamonie Lakes under the cost sharing category of the 
completed projects program. 
Operations during fiscal year. New work: None. 
Maintenance: Routine maintenance was performed. Flood 
damages of $533,000 were prevented during the 1987 
flood season. 
24-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Construction started in October 1956 and all major 
items of work were completed December 1961. Land acquisition 
is complete. Project has been in operation since 
August 1960. Cost shared recreation facilities constructed 
by the State of Indiana under the completed projects program 
are completed. 
21. CLARENCE J. BROWN DAM & 
RESERVOIR, OH 
Location. Damsite is just east of Springfield, Clark 
County, OH, at mile 7.3 of Buck Creek, a tributary of Mad 
River. (See U. S. Geological Survey maps of New 
Moorefield and Springfield, OH.) 
Existing project. A reservoir for flood control and 
allied purposes. It includes an earthfill dam, 6,620 feet 
long and 72 feet high, with gated outlet works and open 
cut spillway with concrete chute through right abutment. 
Total storage capacity of reservoir is 63,700 acre-feet 
(32,900 for flood control and 20,800 for water quality control). 
Federal cost of completed project is $22,083,660. Project 
was authorized by 1962 Flood Control Act. Project 
name was changed from Buck Creek Dam and Reservoir 
to Clarence J. Brown Dam and Reservoir by Public Law 
90-46, July 4, 1967. 
Local cooperation. Assurances from City of 
Springfield, Springfield Conservancy District, and Clark 
County, Ohio, covering protection against detrimental 
channel encroachment below dam to mouth of Buck 
Creek, were accepted March 5, 1964. 
Operations during fiscal year. New work: None. 
Maintenance: Routine maintenance was performed. 
Operation for flood control during the 1987 flood season 
prevented damages of $15,000. 
Construction started in September 1966. Land acquisition 
and all major project features were completed in 
November 1973. The project was placed in operation in 
January 1974. 
22. GREEN RIVER LAKE, KY 
Location. Damsite is 305.7 miles above mouth of 
Green River in Taylor County, KY, about 8 miles south 
of Campbellsville. Reservoir lies in Taylor and Adair 
Counties. (See U. S. Geological Survey map of Cane 
Valley, KY.) 
Existing project. A reservoir for flood control and 
allied purposes. Dam is earth and rock-fill, 141 feet high 
and 2,350 feet long. Outlet works is slide gate-controlled 
and spillway open and uncontrolled. Total storage 
capacity is 723,200 acre-feet (560,600 for flood control and 
64,500 for low-flow augmentation). Cost of completed new 
work is $33,606,061, including $317,145 Federal funds 
and $183,732 non-Federal funds for construction of recreation 
facilities under the completed projects program. 
Existing project was authorized under general authorization 
for Ohio River Basin in 1938 Flood Control Act. 
Local cooperation. None required by authorizing act. 
Taylor County, by lease approved by Secretary of Army 
February 15, 1968, undertook operation and maintenance 
of Smith Ridge public access area. In May 1980, the lease 
was amended to turn back responsibility for maintenance, 
and operation of 99 percent of the site to the Corps, with 
the County retaining responsibility for the marina area. 
Under provision of Water Supply Act of 1958, contract 
with City of Campbellsville for water supply storage was 
approved by Secretary of Army April 23, 1969. Terms require 
city to repay, with interest and annual charges for 
operation, maintenance and major replacement, the investment 
cost of $85,765 allocated to its water supply 
storage space. Total payments received through fiscal 
year 1984 was $21,504. The Department of Parks of the 
Commonwealth of Kentucky, by lease approved by 
Secretary of Army, October 4, 1971, has undertaken the 
management of the Lone Valley public access area. 
Operations during fiscal year. New work: None. 
Maintenance: Routine maintenance was performed. 
Operation for flood control prevented damages estimated 
at $981,000 during the 1987 flood season. 
Construction began in August 1965 and all major construction 
and relocation items were completed in 1972. 
Project has been in operation since February 1969. Project 
including all land acquisition complete in 1973. 
Construction of sanitary dump station for boats at Dam 
Site in conformance with EPA and State standards and 
rehabilitation of sewage treatment facilities, washhouses 
and restrooms at Smith Ridge site is complete. 
23. HUNTINGTON LAKE, IN 
Location. Damsite is on Wabash River, about 2 miles 
from Huntington, IN, and 411.4 miles above mouth. 
Reservoir is in Huntington and Wells Counties, IN. (See 
U. S. Geological Survey maps of Majenica and Mt. Etna, 
IN.) 
Existing project. A reservoir for flood control and 
recreation. Dam consiste of a rolled earth embankment 
4,700 feet long and 89 feet high, a concrete spillway and 
outlet section 155 feet long, and a concrete gravity section 
310 feet long. Spillway is controlled by three gates, 
and outlet works by six sluices. Project also provides local 
flood protection for Markle, IN. Total storage capacity of 
reservoir is 153,100 acre-feet, of which 149,000 acre-feet 
is reserved for flood control storage. Estimated cost for 
new work (1987) is $19,777,863 made up of $19,273,252 
Federal cost for the initial project and $193,903 non- 
Federal contributed funds for low flow augmentation 
storage, and $155,354 Federal cost and $155,354 non- 
Federal contribution in kind for recreation facilities under 
the completed projects program. Project was authorized 
by Flood Control Act of 1958. 
Local cooperation. Local interests must contribute 
in cash an amount equal to one percent of project first 
cost. State of Indiana has met this obligation. Contract 
with the Indiana Department of Natural Resources, 
approved by the Secretary of the Army May 17, 1974, provided 
for that agency to design and construct certain 
additional recreational facilities at Cecil M. Harden, 
24-8

LOUISVILLE, KY. DISTRICT 
Huntington, Mississinewa, Monroe and Salamonie Lakes 
under the cost shared category of the completed projects 
program. 
Operations during fiscal year. New work: None. 
Maintenance: Routine maintenance was performed. 
Operation for flood control prevented damages estimated 
at $84,000 during the 1987 flood control season. 
Land acquisition and all major construction complete. 
Project was placed in operation January 9, 1969. Cost 
shared recreation facilities constructed by the State of 
Indiana under the completed projects program are 
complete. 
24. MISSISSINEWA LAKE, IN 
Location. Damsite is 7.1 miles above mouth of 
Mississinewa River, which flows into Wabash River about 
2 miles upstream from Peru, IN. At flood control pool 
level, reservoir extends upstream about 28 miles, in 
Wabash, Grant, and Miami Counties, IN. (See U.S. 
Geological Survey map of Peoria, IN.) 
Existing project. Provides for construction of a reservoir 
for flood control and allied purposes. It includes an 
earthfill dam 137 feet high and 8,100 feet long, gatecontrolled 
outlet works, and an uncontrolled open 
spillway through right abutment. Total storage capacity 
of reservoir is 368,400 acre-feet, of which 345,100 acrefeet 
are reserved for flood control storage. Cost for completed 
new work is $24,985,521 made up of $23,967,537 
Federal cost for the initial project and $239,200 non- 
Federal contributed funds for low flow augmentation 
storage and $389,392 Federal cost and $389,382 non- 
Federal contribution in kind for recreation facilities under 
the completed projects program. Project was authorized 
by the Flood Control Act of 1958. 
Local cooperation. Local interests must contribute 
in cash an amount equal to 1 percent of project first cost. 
State of Indiana assumed this obligation. A contract with 
the Indiana Department of Natural Resources, approved 
by the Secretary of the Army in May 1974, provided for 
that agency to design and construct certain additional 
recreation facilities at Cecil M. Harden, Huntington, 
Mississinewa, Monroe and Salamonie Lakes under the 
cost sharing category of the completed projects program. 
Operations during fiscal year. New work: None 
Maintenance: Routine maintenance was performed. 
Operation for flood control prevented damages of 
$1,114,000 during 1987 flood season. 
Construction and land acquisition is complete. Project 
was placed in operation in May 1968. Cost shared recreation 
facilities cconstructed by the State of Indiana under 
the completed projects program are complete. 
25. MONROE LAKE, IN 
Location. Dam is on Salt Creek, a tributary of White 
River, 25.9 miles above mouth, and 2 miles each of 
Harrodsburg, Monroe County, IN. At flood control pool 
level, reservoir will extend upstream 44 miles in Monroe, 
Brown, and Jackson Counties. (See U.S. Geological 
Survey map of Clear Creek, IN.) 
Existing project. A reservoir for flood control and 
allied purposes. Dam is earth core and rock shell, with 
gate-controlled outlet works and uncontrolled open 
spillway. Total storage capacity is 441,000 acre-feet 
(258,800 for flood control and 159,900 for low flow 
augmentation.) Cost of completed new work is 
$16,569,589 made up of $7,032,484 Federal cost for the 
initial project and $7,797,604 non-Federal contributed 
funds for low-flow regulation storage and $870,343 
Federal cost and $869,158 non-Federal contribution in 
kind for recreation facilities under the completed projects 
program. Project was authorized by 1958 Flood Control 
Act, modifying comprehensive plan for Ohio River Basin. 
Local cooperation. Section 3,1944 Flood Control Act 
applies. Local interests must contribute 54.1 percent of 
project cost, this being the proportion allocated to low-flow 
regulation feature, plus a capitalized amount 
representing that part of average annual maintenance 
and operation cost allocated to low-flow regulation. State 
of Indiana assumed this cost sharing obligation. A contract 
with the Indiana Department of Natural Resources, 
approved by the Secretary of the Army in May 1974, provided 
for that agency to design and construct certain 
additional recreation facilities at Cecil M. Harden, 
Huntington, Mississinewa, Monroe and Salamonie Lakes 
under the cost sharing category of the completed projects 
program. 
Operations during fiscal year. New work: None. 
Maintenance: Routine maintenance was performed. 
Operation for flood control prevented damages of $274,000 
during 1987 flood season. 
Project is complete and was placed in operation in 
February 1965. Cost shared recreation facilities constructed 
by the State of Indiana under the completed 
projects program are complete. 
26. NOLIN LAKE, KY 
Location. Dam is on Nolin River 7.8 miles above its 
confluence with Green River, about 70 air miles 
southwest of Louisville, KY. Reservoir extends upstream 
about 57 miles and is in Edmonson, Grayson, Hart, and 
Hardin Counties, KY. (See U.S. Geological Survey maps 
of Nolin Reservoir and Dickeys Mill, KY.) 
Existing project. A reservoir for flood control and 
allied purposes. Dam is rockfill-earth core type with gatecontrolled 
outlet works, and uncontrolled open spillway. 
Total storage capacity is 609,400 acre-feet, of which 
545,600 acre-feet is for flood control. For further details 
of project see Annual Report for 1962, page 1124. 
Estimated Federal cost of new work (1987) is $17,193,381 
including $2,596,317 for construction of recreation 
facilities. Project was selected for construction under 
general authorization for Ohio River Basin in 1938 Flood 
Control Act. 
Local cooperation. None required for authorized 
project. State of Kentucky contributed $18,195 for 
increased width of dam for public road. 
Operations during fiscal year. New work: None. 
Maintenance: Contract for control tower maintenance and 
24-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
bulkhead modification was continued. A contract for Stilling 
Basin repairs was awarded in April 1987. Rountine 
maintenance was performed. Operation for flood control 
during the 1987 flood season prevented damages 
estimated at $1,038,000. 
Construction started in January 1959. Project was completed 
and placed in operation in March 1963. 
27. OHIO RIVER BASIN 
(Louisville District) 
Location. Works covered by this project are a series 
of levees, floodwalls, channel improvements, and reservoirs 
in Ohio River Basin within Louisville District. 
Existing project. Individual projects considered in 
comprehensive plan within the Louisville District. (See 
Table 24-B for authorizing leglsiation, and Table 24-I for 
cost and listing of projects in the basin plan.) 
Operations during fiscal year. No costs were 
incurred except for these projects for which individual 
reports are given. 
28. PATOKA LAKE, IN 
Location. Damsite is in Dubois County, IN, 118.3 
miles above mouth of Patoka River, and 50 miles westnorthwest 
of New Albany, IN. Reservoir extends into 
Dubois, Orange and Crawford Counties. (See Geological 
Survey map of Cuzco, IN.) 
Existing project. Reservoir for flood control and allied 
purposes. Dam is earth and rock fill, 1,550 feet long and 
85 feet high, with gate-controlled outlet works and uncontrolled 
open spillway. Total storage capacity is 301,600 
acre-feet (121,000 for flood control and 167,500 for water 
supply and water quality control). Estimated cost of new 
work (1987) is $78,417,700 of which $1,361,200 is Federal 
cost for emergency remedial measures and to clear and 
snag the Patoka River downstream of Patoka Lake, which 
work was directed by Congress in 1981; $51,507,800 is 
Federal cost for other construction, and $25,548,700 is 
non-Federal contribution for water supply storage and 
recreation facilities. Project was authorized by 1965 Flood 
Control Act, and emergency measures and snagging and 
clearing the Patoka River downstream of Patoka Lake 
to insure effective operation of the project for flood control 
was directed by 1981 Appropriation Act for Energy 
and Water Development. 
Local cooperation. Local interests are required to 
reimburse the Federal Government for costs allocated to 
water supply storage over a period not to exceed 50 years 
after use of this storage is initiated, presently estimated 
at 29.316 percent of the joint-use facilities cost, exclusive 
of interests, plus $287,000 for the cost of operating and 
maintaining water supply storage for a period of 50 years, 
plus $42,000 for the cost of major capital replacements 
required for water supply storage space for a period of 50 
years. Local interests are also required to pay, contribute 
in kind, or repay (which may be through user fees) with 
interest, one-half of the separable first cost of the project 
allocated to recreation. Present laws of the State of 
Indiana require that agency to make cash contributions 
during construction of the project. Local interests must 
also agree to prevent encroachments on channel of Patoka 
River from dam to mouth, and to pay allocated initial and 
annual maintenance and operation costs for water supply 
storage. Formal assurances of local cooperation, executed 
by the Indiana Natural Resources Commission, were 
accepted August 27,1970. Contracts with State of Indiana 
for water supply and recreation were approved by the 
Secretary of the Army November 2, 1970. 
Operations during fiscal year. New work: None. 
Maintenance: Routine maintenance was performed. 
Operation for flood control during the 1987 flood season 
prevented damage estimated at $926,000. 
Construction was started in July 1972. Engineering 
studies are complete. Land acquisition is about 99 percent 
complete. All major features are complete. Permanent 
impoundment was started in February 1978 and the 
project was placed in operation about August 1980. The 
project is about 99 percent complete overall. 
29. ROUGH RIVER LAKE AND 
CHANNEL IMPROVEMENT, KY 
Location. Dam is on Rough River, 89.3 miles above 
its confluence with Green River 160.3 miles above Ohio 
River, and about 60 miles southwest of Louisville, KY. 
Reservoir extends upstream about 30 miles and is in 
Breckinridge, Hardin, and Grayson Counties, KY. Channel 
improvement work is on Rough River, Barnett Creek, 
and West Fork of Barnett Creek. (See U.S. Geological 
Survey maps of McDaniels and Falls of Rough, KY.) 
Existing project. Reservoir is for flood control and 
allied purposes. Dam is rolled earthfill type, with gatecontrolled 
outlet works. Storage capacity is 334,380 acrefeet, 
of which 314,210 acre-feet is for flood control. Project 
also includes channel clearing of lower Rough River, and 
channel improvement on Barnett Creek, a tributary of 
Rough River. For further details see page 1126 of Annual 
Report for 1962. Cost of completed new work is 
$10,643,001 including $890,008 Federal funds and 
$22,612 non-Federal funds for construction of recreation 
facilities under the completed projects program. Existing 
project was selected for construction under general 
authorization for Ohio River Basin in 1938 Flood Control 
Act. Modification of previously approved plan to include 
channel improvement items was authorized by the 
1944 Flood Control Act. 
Local cooperation. None required for construction of 
reservoir unit. Provisions of Section 3, Flood Control Act 
of 1936, are applicable to channel improvements. 
Assurances were obtained from Ohio County for channel 
improvement. Department of Parks, Commonwealth of 
Kentucky, has undertaken management of certain lands 
and recreation facilities in accordance with license 
granted by Secretary of the Army on August 18, 1961. 
A contract with the Commonwealth of Kentucky to improve 
and pave road at the Below Dam Area - State Park 
under the cost sharing category of the completed projects 
program was approved by the Secretary of the Army 
November 4, 1977. 
24-10

LOUISVILLE, KY. DISTRICT 
Operations during fiscal year. New work: None. 
Maintenance: Routine maintenance was performed. 
Operation for flood control during the 1987 flood season 
prevented damages estimated at $2,947,000. 
Construction started in November 1955 and reservoir 
was placed in operation in June 1959. Land acquisition 
and all major items of construction and relocation are 
complete. 
30. SALAMONIE LAKE, IN 
Location. Damsite is 3.1 miles above mouth of 
Salamonie River which enters Wabash River about 6 
miles upstream from Wabash, IN. Reservoir extends 
upstream about 27 miles at flood control pool and lies in 
Wabash and Huntington Counties, IN. (See U. S. 
Geological Survey maps of Lagro and Majenica, IN.) 
Existing project. Provides for construction of a reservoir 
for flood control and allied purposes. It includes an 
earthfill dam with a maximum height of 133 feet and and 
length of 6,100 feet, gate-controlled outlet works with a 
16-foot diameter conduit and an uncontrolled open 
spillway through right abutment. Total storage capacity 
of reservoir is 263,600 acre-feet, of which 250,500 acrefeet 
is for flood control storage. Estimated project cost for 
new work (1987) is $17,046,151 made up of $16,244,356 
Federal cost for the initial project and $170,697 non- 
Federal contributed funds for low-flow augmentation 
storage and $315,549 Federal cost and $315,549 non- 
Federal contribution in kind for recreation facilities under 
the completed projects program. Project was authorized 
by Flood Control Act of 1958. 
Local cooperation. Local interests must contribute 
in cash an amount equal to one percent of project first 
cost. State of Indiana assumed this obligation. A contract 
with the Indiana Department of Natural Resources, 
approved by the Secretary of the Army in May 1974, provided 
for that agency to design and construct certain 
additional recreation facilities at Cecil M. Harden, 
Huntington, Mississinewa, Monroe, and Salamonie Lakes 
under the cost sharing category of the completed projects 
program. 
Operations during fiscal year. New work: None. 
Maintenance: Routine maintenance was performed. During 
the 1987 flood season, operation for flood control 
prevented damages of $515,000. 
Land acquisition and all major construction and relocation 
contracts are complete. Reservoir was placed in 
operation in spring 1967. Cost shared recreation facilities 
constructed by the State of Indiana under the completed 
projects program are complete. 
31. TAYLORSVILLE LAKE, KY 
Location. Damsite is in Spencer County, KY, 60.0 
miles above the confluence of Salt River and Ohio River, 
4 river miles above Taylorsville and 36.9 river miles 
above Shepherdsville, KY. (See U. S. Geological Survey 
map of Taylorsville, KY.) 
Existing project. A reservoir for flood control and 
allied purposes. Dam will be an earth and rock fill structure, 
164 feet high and 1,280 feet long. Outlet works will 
be slide gate controlled and spillway will be uncontrolled 
open cut. Total storage capacity will be 291,670 acre-feet 
(211,230 for flood control, winter months), and 52,245 for 
water quality and fish and wildlife. Estimated cost of new 
work (1987) is $120,352,000 made up of $92,350,000 
Federal cost for the initial project and $16,550,000 non- 
Federal contributed funds for initial recreation facilities 
and $5,726,000 Federal cost and $5,726,000 non-Federal 
contributed funds for recreation facilities under the completed 
projects program. Project was authorized by 1966 
Flood Control Act. 
Local cooperation. Local interests must agree to administer 
project land and water areas for recreation; pay, 
contribute in kind, or repay (which may be through user 
fees) with interest one-half of the separable first costs of 
the project allocated to recreation; bear all costs of operation, 
maintenance, and replacement of recreation lands 
and facilities. Local interests must also agree to prevent 
encroachments on flow-carrying capacities of stream 
channels below the reservoir to the extent needed to provide 
reasonably effective reservoir operation. Commonwealth 
of Kentucky has indicated intent to fulfill requirements 
for recreation cost sharing and has assumed 
responsibility for channel encroachments and pollution 
control. The Commonwealth furnished assurance 
agreements covering prevention of encroachment on 
capacity of stream channels in April and May 1973 and 
executed the recreation cost sharing contract in April 
1973. On April 2, 1980 the U. S. District Court for the 
Western District of Kentucky ruled that the 1973 recreation 
cost sharing contract between the Commonwealth 
and the United States that provded for repayment after 
completion was invalid under the Kentucky Constitution 
which prohibits one General Assembly from obligating 
future appropriations that would be binding on a subsequent 
legislature. In response to the Court's ruling, the 
Commonwealth and the United States entered into a new 
contract providing for cash contributions. Contract was 
approved by the Secretary of the Army June 11, 1980. The 
contract was found to be valid and enforceable by the 
Court July 14, 1980. 
Operations during fiscal year. New work: Engineering 
and design studies and land acquisition continued. 
Contracts for telephone line relocation and Possum Ridge 
Roads were awarded. Contract for final paving of 
relocated state highways and Settlers Trace access road 
and parking lot repairs advanced to completion. Routine 
maintenance was performed. During the 1987 flood 
season operation for flood control prevented damages of 
$519,000. 
Engineering and design studies are about 89 percent 
complete and land acquisition is about 96 percent complete. 
Construction was started in June 1974. All major 
construction items are complete except utility relocations 
and recreation facilities. The dam gates were closed in 
January 1983 for permanent impoundment. Dedication 
ceremony was May 28, 1983. The project is about 87 percent 
complete overall. 
32. WABASH RIVER BASIN 
Location. Works covered by this project are located 
24-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
in the Wabash River Basin, a drainage area of 33,100 
square miles, covering parts of Indiana, Illinois and Ohio. 
Existing project. One local protection project and five 
reservoir projects were authorized for this basin plan. (See 
Table 24-B for authorizing legislation and Table 24-J for 
project list and total cost of basin plan.) 
33. WEST FORK OF MILL 
CREEK LAKE, OH 
Location. Dam is on West Fork of Mill Creek 6.5 
miles above its junction with Mill Creek and 2 miles 
northeast of Mount Health, OH, and 10 miles north of 
downtown Cincinnati. Reservoir extends upstream about 
3 miles and is in Hamilton County, OH. (See U. S. 
Geological Survey map of Glendale, OH.) 
Existing project. An earth embankment dam and a 
reservoir for flood control, recreation, and reduction of 
pumping requirements at Mill Creek barrier dam in 
Cincinnati. Total storage capacity of reservoir is 11,300 
acre-feet, of which 9,850 acre-feet is for flood control. For 
further details see page 1119 of Annual Report for 1962. 
Cost of completed new work is $4,722,463 made up of 
$3,092,941 Federal cost for the initial project, $520,800 
non-Federal cost for sewer relocation and dam, $50,000 
non-Federal contributed funds in fulfillment of project 
authorization and $529,361 Federal cost and $529,361 
non-Federal contribution in kind for recreation facilities 
under the completed projects program. Existing project 
selected for construction under additional authorization 
for Ohio River Basin in 1946 Flood Control Act. 
Local cooperation. Local interests were to release 
necessary land under their control and give assurance 
that future channel encroachment below damsite would 
be prevented. For enlargement of reservoir to include a 
conservation pool, local interests would contribute onehalf 
additional cost of such pool, including one-half cost 
of relocation of sanitary sewer, and agree to hold the 
United States free from damages resulting from its provision. 
Board of County Commissioners of Hamilton 
County, Ohio, adopted a resolution October 8, 1947, signifying 
willingness to fulfill requirements including provision 
of conservation pool. Assurances were executed on 
same date. A contract with the United States for relocation 
of sanitary sewer outside reservoir area in order to 
include conservation pool in project was accepted by 
Hamilton County, in which the United States paid onehalf 
cost of such relocation work. Hamilton County 
Commissioners furnished $50,000, required as a local contribution 
toward additional cost of providing conservation 
pool. Hamilton County Park District has undertaken 
development and management of recreation facilities in 
reservoir area for use of the public in accordance with the 
license granted by Secretary of the Army on October 31, 
1951. Contract for cost shared recreation development 
under the completed works program was executed by the 
Board of Park Commissioners, Hamilton County Park 
District, Ohio, in September 1975 and approved by the 
Chief of Engineers in December 1975. 
Operations during fiscal year. New work: None. 
Maintenance: Routine maintenance was performed. 
Operation for flood control during 1987 flood season 
prevented damages estimated at $11,000. 
Construction started in March 1949 and reservoir was 
placed in operation in December 1952. Project is complete. 
Cost shared recreation development under the completed 
projects program is complete. 
34. WILLIAM H. HARSHA LAKE, OH 
Location. Damsite is on East Fork of Little Miami 
River between Batavia and Williamsburg, OH, about 6.0 
miles above Batavia and 32.6 miles above mouth of the 
Little Miami River. Entire project lies in Clermont 
County, OH. (See U. S. Geological Survey map of Batavia, 
OH.) 
Existing project. A reservoir for flood control and 
allied purposes. It includes an earthfill dam, outlet works, 
an uncontrolled saddle spillway, and a dike to close a saddle 
north of spillway. Total storage capacity of reservoir 
is 294,800 acre-feet, of which 210,600 acre-feet is reserved 
for flood control storage. Estimated cost of new work 
(1987) is $54,932,000 including $3,484,354 non-Federal 
reimbursement for water supply storage. Existing project 
was authorized by general authorization for Ohio River 
Basin in 1938 Flood Control Act. Project name was 
changed from East Fork Lake to William H. Harsha Lake 
effective January 4, 1981 by Public Law 96-383, 
October 6, 1980. 
Local cooperation. None required. However, the 
State of Ohio requested inclusion in the project of storage 
for future municipal and industrial water supply uses. 
Contract with State of Ohio for water supply storage 
under provisions of Water Supply Act of 1958, as amended, 
was approved by Secretary of the Army, May 20, 1970. 
Under terms of contract, State will reimburse the Federal 
Government for costs allocated to water supply storage 
over a period not to exceed 50 years after use of this 
storage is initiated plus estimated annual amount for cost 
of operation, maintenance and major capital replacements 
required for the water supply facilities. 
Operations during fiscal year. New work: None. 
Maintenance: Routine maintenance was performed. 
Operation for flood control during 1987 flood season 
prevented zero damages. 
Construction was started in May 1970. Engineering 
studies are 94 percent complete. All land required for 
project has been acquired. Major relocation and construction 
features are complete, except one recreation item. 
Project is about 95 percent complete overall and was placed 
in operation in February 1978. 
35. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Flood Control Act of June 22, 1936, and subsequent acts 
require local interests to maintain and operate local 
protection projects in accordance with regulations 
prescribed by Secretary of the Army. Inspections were 
made to determine extent of compliance and to advise in- 
24-12

LOUISVILLE, KY. DISTRICT 
terests as necessary to measures required to correct deficiencies. 
(See Table 24-K for local protection projects and 
channel improvements inspected.) 
Fiscal year costs were $121,920. Total costs to 
September 30, 1987 were $2,901,967. 
36. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See Table 24-E. 
37. FLOOD CONTROL WORKS UNDER 
SPECIAL AUTHORIZATION 
Emergency flood control activities pursuant to Public 
Law 99, 84th Congress, and antecedent legislation. Costs 
for fiscal year were $181,797 for disaster preparedness, 
$0 for emergency operations, and $81,062 for repair work 
on four local protection projects. 
Flood control activities pursuant to Section 205, 1948 
Flood Control Act, Public Law 858, 80th Congress, as 
amended. Costs for fiscal year were $169,073 for preparation 
of Reconnaissance Studies. Summary Fact Sheets, 
and Detailed Project Reports on 11 projects, and $80,942 
for Plans and Specifications and construction on three 
projects. 
See Table 24-L. 
Snagging and clearing navigable streams and 
tributaries in interest of flood control (Section 208, 1954 
Flood Control Act, Public Law 780, 83rd Congress). Costs 
for fiscal year were $27,500 for one Reconnaissance Study, 
$1,395 for Plans and Specifications on one project, and 
$130,173 for construction of one project. 
See Table 24-L. 
Emergency bank protection (Section 14,1946 Flood Control 
Act, Public Law 526, 79th Congress). Costs for fiscal 
year were $56,030 for preparation of Reconnaissance 
Studies on nine projects. 
See Table 24-L. 
General Investigations 
38. SURVEYS. 
Fiscal year costs were $2,523,133 consisting of 
$2,046,493 for four flood damage prevention studies and 
the Ohio River Main Stem Study; $142,591 for the 
Wabash River Navigation Study and Grayville Special 
Report, $90,091 for Special Investigations, $35,006 for 
review of Federal Energy Regulatory Commission 
licenses, $208,542 for planning assistance to states, and 
$410 for Deauthorization review study. 
39. COLLECTION AND STUDY 
OF BASIC DATA 
Fiscal year costs were $153,749 for flood plain management 
services. 
40. PRECONSTRUCTION 
ENGINEERING AND DESIGN 
Fiscal year costs were $2,422,587 for continuation of 
detailed planning and engineering studies for Olmsted 
Locks & Dam. Fiscal year costs were $429,908 for 
Preconstruction Engineering and Design (PED) studies 
on Holes Creek, West Carrollton, Ohio; Miami River, 
Pleasant Run, Ohio; and South Frankfort, Kentucky 
Local Proteciton Projects. 
24-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 24-A 
See 
Section 
in Text 
COST AND FINANCIAL STATEMENT 
Project Funding 1984 1985 
Total to 
1986 1987 Sep 30, 1987 
Navigation - Locks 
2 Green and Barren 
Rivers, KY 
3 Kentucky River, KY 
and Dams 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp 
Cost 
Maint. 
Approp. 
Cost 
Minor Rehab. 
Approp. 
Cost 
- $ - $ - $ - $13,808,2221 
- - - - 13,808,2221 
1,516,927 1,987,840 1,238,500 1,254,300 29,356,4122 3 
1,926,628 2,154,447 1,267,516 1,206,604 29,294,6362 3 
-- - - 4,176,749 
- - - - 4,176,749 
1,161,700 1,411,000 2,505,800 1,744,500 50,700,0894 5 
1,168,626 1,609,460 2,493,699 1,735,988 50,667,7504 5 
- - - - 556,956 
- - - - 556,956 
Flood Control - Local Protection 
7 Dayton, KY New Work 
Approp. 
Cost 
8 Evansville, IN New Work 
Approp. 
Cost 
9 Levee Unit No. 5, 
Wabash River, IN 
10 Mason J. Niblack 
Levee, IN 
11 Mill Creek, OH 
12 Southwestern 
Jefferson County, 
KY 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
207,000 
510,989 
1,800,000 
1,664,831 
15,100 
76,533 
716,000 
757,338 
-59,600 -89,000 
175,279 473,628 
105,000 
109,246 
-89,000 
300,448
0 
-37,029 
-1,000 
673 
1,439 
363,000 
410,957 
13,117,3456 
13,117,3456 
28,739,8567 
28,651,309' 
-90,000 7,440,987 
5,054 7,439,014 
- 4,337,617 
- 4,337,617 
7,639,900 9,586,000 9,614,000 12,463,000 
6,083,545 10,952,631 10,064,391 10,592,245 
52,834,742 
49,826,505 
1,420,000 2,430,000 3,484,000 6,422,000 48,767,183 
2,552,857 1,286,893 4,731,054 5,664,866 46,957,285 
Flood Control - Reservoirs 
13 Barren River Lake, KY New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
(Contributed Funds) New Work 
Contrib. 
Cost 
1,077,000 1,268,000 1,189,000 
1,015,488 1,322,216 1,167,073 
- 27,371,2998 
- 27,371,2998 
1,740,100 15,156,5269 10 11 
1,658,886 15,008,7769 10 11 
- 108,41812 
- 108,41812 
14 Brookville Lake, IN 
(Contributed Funds) 
15 Buckhorn Lake, KY 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp, 
Cost 
-23,000 
28,440 
329,000 
334,843 
663,000 
672,955 
24-14 
-56 
409,000 
418,991 
640,000 
651,327 
95 555 
420,000 416,500 
410,678 400,067 
- 13,805 
12 555 
791,500 
801,081 
660,400 
648,737 
37,918,889 
37,905,074 
4,237,689 
4,205,850 
7,578,195 
7,578,195 
11,766,2061 
11,766,206' 
9,527,31014 
9,497,22014 
_ ___ I_ 
_ __ I I__ W~_ ~1~_~1~ ---^------~--

LOUISVILLE, KY. DISTRICT 
TABLE 24-A 
CONTINUED 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding 1984 1985 1986 1987 Sep 30, 1987 
Flood Control - Reservoirs 
16 Caesar Creek Lake, OH 
17 Cagles Mill Lake, IN 
(Contributed Funds) 
18 Carr Fork Lake, KY 
19 Cave Run Lake, KY 
20 Cecil M. Harden Lake, 
IN 
21 Clarence J. Brown 
Dam & Reservoir, 
OH 
22 Green River Lake, KY 
23 Huntington Lake, IN 
(Contributed Funds) 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Contrib 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
$ -268,000 $ 169,000 $ - 
1,080,039 320,283 162,680 
561,000 579,000 631,000 
515,619 618,053 601,671 
-100,000 - - 
77,972 447 228 
317,000 506,000 346,000 
317,164 489,109 371,968 
205,000 - - 
106,813 - - 
2,627,600 -40,000 - 
2,697,307 4,993 1,845 
781,000 803,000 747,000 
776,283 768,785 784,850 
1,332,000 724,500 - 
543,867 1,381,479 786,628 
588,000 562,000 485,000 
583,073 557,164 501,921 
327,700 312,000 518,400 
330,662 313,930 500,086 
420,000 374,000 379,000 
373,189 419,925 372,932 
915,500 1,183,000 1,124,000 
908,362 1,177,646 1,143,281 
-251 - - 
522,000 359,000 483,000 
584,133 381,804 458,903 
- $62,893,882 
11,388 62,855,555 
792,100 4,644,563 
771,070 4,578,765 
- 4,263,18415 
- 4,263,18415 
404,600 5,337,106 
386,493 5,314,765 
-91,906 113,094 
- 106,813 
- 50,854,82616 
27,269 50,844,40116 
855,900 7,497,800"7 
814,628 7,426,73017 
400,000 74,262,282 
615,829 74,165,069 
478,300 4,833,846 
470,412 4,815,350 
- 6,633,81218 
- 6,633,81218 
474,000 6,071,496 
472,566 6,046,411 
- 22,083,660 
- 22,083,660 
420,900 4,057,247 
412,987 4,035,862 
- 33,422,32919 
- 33,422,32919 
941,000 12,686,74920 
945,408 12,640,43120 
- 19,428,60621 
- 19,427,95321 
464,900 5,159,912 
431,702 5,097,407 
- 193,903 
- 193,812 
24-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 24-A 
CONTINUED 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
In Text Project Funding 1984 1985 1986 1987 Sep 30, 1987 
Flood Control - Reservoirs 
24 Mississinewa Lake, IN 
(Contributed Funds) 
25 Monroe Lake, IN 
(Contributed Funds) 
26 Nolin Lake, KY 
27 Ohio River Basin, 
Louisville District 
28 Patoka Lake, IN 
(Contributed Funds) 
29 Rough River Lake & 
Channel Improvement, 
KY 
(Contributed Funds) 
30 Salamonie Lake, IN 
(Contributed Funds) 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
364,000 
345,812 
$ - -3,003 
399,000 
331,851 
$ - 
3,003 
411,000 
494,721 
P - 
411,200 
397,788 
$23,967,5372" 
23,967,53722 
4,890,305 
4,863,867 
239,200 
237,871 
- - - - 7,902,82723 
- - - - 7,902,82723 
416,300 308,160 459,600 434,800 5,437,22524 
449,356 341,747 467,832 413,156 5,405,34624 
- - - - 7,797,604 
- - - - 7,797,604 
-1,503 
1,222,500 
1,196,882 
-2,460 
-966 
1,320,000 
1,323,666 
9 
1,413,000 
1,424,694 
-970 
2,011,400 
1,958,358 
17,193,38125 
17,192,41126 
17,368,91527 
17,232,88327 
- 1,526,142 
- 1,526,142 
43,400 
399,647 
320,000 
312,123 
447,150 
339,137 
90,216 
311,000 
313,500 
76,114 
8,114 
379,000 
385,206 
-29,640 
1,618 
20,863 
412,700 
408,563 
53,080,790 
53,079,298 
2,827,831 
2,810,289 
- 20,646,649 
3,528 20,297,349 
- - - - 10,620,38928 
- - - - 10,620,38928 
1,304,000 1,288,000 1,095,000 1,304,500 16,819,31029 
1,279,021 1,320,794 1,104,891 1,241,626 16,712,32429 
- - - - 22,61212 
- - - - 22,61212 
362,000 
325,759 
304,000 
349,873 
444,000 
418,578 
411,700 
394,597 
16,559,90530 
16,559,90530 
4,999,013 
4,951,061 
170,697 
163,867 
24-16

LOUISVILLE, KY. DISTRICT 
TABLE 24-A 
CONTINUED 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding 1984 1985 1986 1987 Sep 30, 1987 
Flood Control - Reservoirs 
31 Taylorsville Lake, KY New Work 
Approp. $3,200,000 $ 844,400 $ - $305,000 $81,601,478 
Cost 4,433,310 1,838,703 516,124 285,296 80,813,120 
Maint. 
Approp. 379,000 468,000 528,000 548,900 2,213,900 
Cost 373,917 489,253 535,625 541,164 2,197,661 
(Contributed Funds) New Work 
Contrib. - - 228,993 678,000 2,678,831 
Cost 448,100 118,180 249,331 186,604 1,922,239 
33 West Fork of Mill New Work 
Creek Lake, OH Approp. -86,600 - - -3,622,3021 
Cost 78 - - - 3,622,3021 
Maint. 
Approp. 294,000 264,000 285,000 296,200 4,055,089 
Cost 288,634 289,713 286,138 282,997 4,038,634 
(Contributed Funds) New Work 
Contrib. - - - - 50,000 
Cost - - - - 50,000 
34 William H. Harsha New Work 
Lake, OH Approp. 37,500 -15,000 - - 52,023,1572 
Cost 665,689 69,624 116,209 8,270 52,016,894"2 
Maint. 
Approp. 381,000 422,000 481,200 444,900 3,624,466 
Cost 378,829 425,414 482,245 443,723 3,604,839 
1 Includes $85,000 public works funds. 
2 Includes $2,000 emergency relief funds, $204,444 
"maintenance and operation of dams and other improvements 
of navigable waters" and $3,842,667 expended from 1888 to 
30 June 1936, for operation and care from permanent indefinite 
appropriation. 
3 Includes $725,715 from Productive Employment 
Appropriation Act (PL 98-8) of 1983. 
* Includes $316,871 under "maintenance and operation of 
dams and other improvements of navigable waters," and 
$6,405,372 expended between July 5, 1885 and June 30, 1937 
on operation and care from permanent indefinite appropriation. 
a Includes $149,700 from Productive Employment 
Appropriation Act (PL 98-8) of 1983. 
6 Includes $12,426 allotted to Bellevue-Dayton and used in 
study of that project. 
' Includes $11,812 emergency relief funds. 
8 Includes $2,224,948 Code 711 funds and $110,107 Code 713 
funds. 
* Includes $100,000 Supplemental funds. 
1o Includes $326,900 Special Recreation Use Fees. 
1 Includes $66,678 "maintenance and operation of dams and 
other improvements of navigable water.' 
1 Cost sharing for Code 713 recreation facilities. 
s Includes $61,451 public work acceleration executive 1963 
funds, $143,088 Code 711 funds, and $243,619 Code 712 funds. 
14 Includes $52,240 Special Recreation Use Fees. 
* Includes $35,814 Code 711 funds and $119,602 Code 713 
funds. 
16 Includes $76,724 Code 711 funds. 
"17In cludes $51,854 Special Recreation Use Fees. 
1 Includes $19,683 Code 711 funds and $353,995 Code 713 
funds. 
19 Includes $133,413 Code 711 funds and $183,732 Code 713 
funds. 
2o Includes $114,280 Special Recreation Use Fees. 
21 Includes $155,354 Code 713 funds. 
22 Includes $389,392 Code 713 funds. 
23 Includes $1,185 Code 711 funds and $869,158 Code 713 
funds. 
' Includes $54,460 from Productive Employment Appropriation 
Act (PL 98-8) of 1983. 
26 Includes $21,897 public works acceleration executive 1963 
funds and $2,596,317 Code 711 funds. 
26 Includes $21,897 public works acceleration executive 1963 
funds and $2,595,347 Code 711 funds. 
27 Includes $204,920 Special Recreation Use Fees, $52,000 
Supplemental Funds, and $66,678 "maintenance and operation 
of dams and other improvements of navigable water. 
* Includes $196,306 public works acceleration executive 1963 
funds, $867,396 Code 711 funds, and $22,612 Code 713 funds. 
2" Includes $236,640 Special Recreation Use Fees. 
30 Includes $315,549 Code 713 funds. 
81 Includes $529,361 Code 713 funds. 
82 Includes $58,571 for preconstruction planning, engineering 
and design completed before FY 1953. 
24-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 24-B AUTHORIZING LEGISLATION 
Acts Work Authorized 
GREEN AND BARREN RIVERS, KY (See Section 2 of Text) 
Aug 11, 1888 Purchase of original improvement 
Mar 3, 18931 Construction of Lock 2, Green River 
Jul 13, 1892 Construction of Lock 5, Green River 
Jul 13, 1902 Construction of Lock 6, Green River 
Mar 3, 19052 Appropriated $5,000 for continuing improvements of Green 
River above mouth of Big Barren River, with provision "That the 
Secretary of War may, in his discretion, expend such portion of 
said amount as may be necessary for removal of snags in 
Nolin River" 
Mar 3, 1909 Construct new Lock 1 and new Lock and Dam 2, Green River 
Jul 3, 19302 Construct new locks at Dam 5, Green River and Dam 1, 
Barren River; modification of Dam 5, Green River, 
widens bends in Bear Creek, KY 
Jun 26, 19343 
Aug 30, 19352 
Sep 3, 1954 
Operation and care of locks and dams with War Department 
Appropriations for rivers and harbors 
Improvement of Nolin River 
Channel enlargement of lower 103 miles of Green River 
Recovation of authorities for improvement of 
Bear Creek and Nolin River 
OHIO RIVER BASIN (Louisville Dist.) (See Section 27 of Text) 
Aug 28, 1937 Construct levee, floodwalls, and drainage structures for protection 
of cities and towns in Ohio River Basin, projects to be selected 
by Chief of Engineers with approval of Secretary of War, at a cost 
not to exceed $24,877,000 for construction 
Jun 28, 1938 Approved general comprehensive plan for flood control and other 
purposes in Ohio River Basin as may be advisable in discretion 
of Secretary of War and Chief of Engineers, and for initiation 
and partial accomplishment of plan, authorized $75 million for 
reservoirs and $50.3 million for local protection works, individual 
projects to be selected and approved by Chief of Engineers subject 
to provision that authorization shall include diversion of Cache River 
above Cairo, Illinois, and protection of area north of Cairo 
drainage district by levees at an estimated cost of $2 million 
Aug 18, 1941 Additional $45 million for further prosecution of comprehensive 
plan for Ohio River Basin 
Dec 22, 1944 Additional $70 million for further prosecution of comprehensive 
plan for Ohio River Basin, including plan of improvement for 
flood control and other purposes in Kentucky River Basin 
Flood protection works at Taylorsville, Kentucky at an 
estimated cost of $129,350 
Channel improvement of lower Rough River and Barnett Creek 
at an estimated cost of $360,000 
Jul 24, 1946 Additional $125 million for further prosecution of comprehensive 
plan, including plan of improvement for flood control in 
Wabash River Basin, Illinois and Indiana, at an estimated cost 
of $9,629,000 
Also, West Fork of Mill Creek at an estimated cost of $1,527,000. 
May 17, 1950 Additional $100 million for prosecution of comprehensive plan 
for Ohio River Basin, including necessary bank stabilization 
measures at New Harmony Bridge, Indiana, at an estimated 
cost of $500,000 
Jul 3, 1958 Flood control Act of 1958 modified comprehensive plan to provide 
for Monroe Reservoir on Salt Creek, White River Basin, Indiana, 
at an estimated cost to the United States of $4,350,000; cost to 
local interests, $5,141,000 
Oct 23, 1962 Flood Control Act of 1962 deleted Jessamine Creek Reservoir 
on Kentucky River, Kentucky, from comprehensive plan for 
Ohio River Basin 
Dec 30, 1963 Additional $150 million for further prosecution of 
comprehensive plan for Ohio River Basin 
Jun 18, 1965 Additional $89 million for further prosecution of 
comprehensive plan for Ohio River Basin 
May 12, 1967 Additional $38 million for further prosecution of 
comprehensive plan for Ohio River Basin 
Aug 13, 1968 Additional $35 million for further prosecution of 
comprehensive plan for Ohio River Basin 
_ _ _ __ _ _ ____~I~ 
24-18 
Documents 
H. Ex. Doc 111, 49th Cong., 
2d Sess., Annual Report 
1887, p. 1903 
Annual Report, 1891, p.2 4 39 
Annual Report, 1891, p.2 4 78 
S. Doc. 82, 83d Cong., 2d Sess. 
Rivers and Harbors Committee 
Doc. 2, 71st Cong., 1st Session, 
and H. Doc. 685, 69th Cong., 
2d Session 
H.D. 480, 72d Congress, 2d Sess. 
S.D. 82, 83d Congress, 2d Sess. 
Flood Control Committee 
Document 1, 75th Congress., 
1st Session 
Flood Control Committee 
Document 1, 75th Cong., 
1st Session 
H. Doc. 504, 78th Congress, 
2d Session 
S.D. 105, 78th Congress, 
1st Session 
H. D. 535, 78th Congress, 
2d Session 
H. D. 197, 80th Congress, 
1st Session 
H.D.198, 80th Congress, 1st Sess 
H. D. 192, 85th Congress, 
1st Session 
H. D. 423, 87th Congress, 
2d Session 
Public Law 88-253, 88th Cong., 
1st Session 
Public Law 89-42, 89th Cong. 
1st Session 
Public Law 90-17, 90th Cong., 
1st Session 
Public Law 90-483, 90th Cong., 
2d Session

LOUISVILLE, KY. DISTRICT 
TABLE 24-B 
CONTINUED 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
OHIO RIVER BASIN (Louisville Dist.) (Cont'd.) 
Jun 19, 1970 Additional $69 million for further prosecution of comprehen- Public Law 91-282, 91st Congress, 
sive plan for Ohio River Basin 2d Session 
Mar 7, 1974 Additional $120 million for further prosecution of comprehen- Public Law 93-251, 93rd Congress, 
sive plan for Ohio River Basin 2d Session 
Mar 7, 1974 Fifty-four local protection projects and one reservoir project in Public Law 93-251, 93rd Congress, 
comprehensive plan for Ohio River Basin were deauthorized 2d Session 
August 5, 1977, under Section 12, Water Resources 
Development Act of 1974 
Two additional local protection projects in comprehensive 
plan for Ohio River Basin were deauthorized November 6, 
1977, under Section 12, Water Resources Development 
Act of 1974 
WABASH RIVER BASIN (See Section 32 of Text) 
Aug 13, 1968 Construction of five multiple purpose reservoirs and one S.D. 96, 90th Congress, 2d Session 
local protection project in Wabash River Basin, IL & IN, with 
proviso that construction of Big Walnut Lake, IN, project 
must be approved by the President. Authorization of $50 
million for initiation and partial accomplishment of project. 
Dec 29, 1981 Two multiple purpose reservoirs in Wabash River Basin were Public Law 97-128, 97th Congress, 
deauthorized 2d Session 
1 Deficiency act. 
2 Authorization for Nolin River and Bear Creek revoked by Act 
of Sep. 3, 1954. 
3 Permanent Appropriations Repeal Act. 
TABLE 24-C OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 5 of Text) 
For Last Cost to Sep 30,1987 
Full Report 
See Annual Operation and 
Name of Project Status Report Construction Maintenance 
Licking River 
Rough River, KY 
Tradewater River, KY 
White River, IN 
Completed 
Completed 
Completed 
Completed 
1901 
1951 
1858 
1909 
$ 13,045 
105,500 
18,568 
119,312 
$ � 
101,196 
33,331 
24-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 24-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last 
Full Report 
See Annual 
Project and Status' Report For 
Cost to Sep 30, 1987 
Construction 
Operation and 
Maintenance 
Local Protection: 
Completed: 
Boone County, KY (Ohio River, Rabbit Hash) 
Brevoort Levee, IN (Wabash River) 
Brookport, IL 
Cannelton, IN 
Canoe Creek, Henderson, KY2 
Chaplin River, Perryville, KY2 
Cincinnati, OH 
Covington, KY 
Delphi, IN (Wabash River) 
England Pond Levee, IL (Wabash River) 
English, IN (Little Blue River)2 
Frankfort, KY (North Frankfort) (Kentucky River s 
Gill Township Levee, IN (Wabash River) 
Golconda, IL 
Grassy Creek, Jackson County, IN 
(Muscatatuck River)2 
Harrisburg, IL 
Hawesville, KY 
Indianapolis, IN (Fall Creek Section) 
(White River) 
Indian Creek, Corydon, IN s 
Jackson, KY (Kentucky River) 
Jeffersonville-Clarksville, IN 
Lawrenceburg, IN 
Lebanon Junction, KY (Salt River)2 
Levee Unit 8, IN (White River) 
Louisville, KY4 
Lyford Levee Unit, IN (Wabash River) 
Mason J. Niblack Levee, IN (Wabash River)2 
Mill Creek, Jefferson County, KY2 
Mount Carmel, IL (Wabash River) 
Muncie, IN (White River) 
Neon-Fleming, KY (Kentucky River) 
New Albany, IN 
New Harmony Bridge, IL & IN (Wabash River) ' 
Newburgh, IN (Ohio River)2 
Newport, KY 
Paducah, KY 
Panther Creek, KY (Green River)2 
Portland, IN (Salamonie River)a 
Reevesville, IL (Cache River) 
Rochester & McCleary's Bluff Levee, IL 
(Wabash River) 
Rosiclare, IL 
Saline River & Tribs, IL 
Shawneetown, IL7 
Sturgis, KY 
Taylorsville, KY (Salt River) 
Tell City, IN 
Terre Haute (Conover Levee), IN (Wabash River)' 
Town Creek, Harrodsburg, KY2 
Triplett Creek, Morehead, KY (Licking River)2 
Uniontown, KY 
Vincennes, IN (Wabash River)7 
West Terre Haute, IN (Wabash River) 
Active: 
Frankfort, KY (South Frankfort) (Kentucky River)2 * 
Grayville, IL 
Holes Creek, West Carrollton, Ohio9 (Great Miami River) 
Louisville, KY 
Miami River Basin, Pleasant Run, Vicinity I rfield, OH9 
(Great Miami River) 
Russell & Allison Levee, IL (Wabash River) 
Salyersville, KY (Licking River) 
1977 
1954 
1958 
1959 
1957 
1965 
1953 
1972 
1965 
1979 
1948 
1960 
1953 
1952 
1955 
1953 
1964 
1957 
1959 
1953 
1967 
1952 
1975 
1944 
1965 
1973 
1972 
1956 
1963 
1957 
1959 
1974 
1959 
1959 
1970 
1962 
1954 
1972 
1954 
1981 
1972 
1952 
1956 
1965 
1967 
1972 
1956 
1964 
1977 
1979 
1946 
$ 392,443 
1,240,299 
S597,493 
2,068,391 
1,206,852 
832,700 
10,150,935 
7,862,937 
144,563 
734,498 
372,353 
2,960,970 
561,200 
565,333 
70,304 
870,015 
969,318 
1,788,840 
300,143 
130,952 
4,226,361 
2,473,414 
130,417 
700,534 
26,721,438 
267,391 
1,554,712 
292,710 
1,980,675 
887,835 
86,532 
5,375,471 
297,624 
52,061 
7,512,987 
4,761,551 
254,031 
237,657 
600,300 
1,079,236 
622,544 
7,826,219 
91,000 
1,826,778 
378,050 
932,229 
14,913 
56,505 
893,094 
1,070,926 
3,308,941 
1,095,704 
52,088 
256,986 
24-20 
_ __ _ __ _I _ __

LOUISVILLE, KY. DISTRICT 
TABLE 24-E 
CONTINUED 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep 30, 1987 
Full Report 
See Annual Operation and 
Project and Status' Report For Construction Maintenance 
Inactive: 
Frankfort, KY (Benson Creek) (Kentucky River) 1979 - - 
Greenfield Bayou Levee, IN (Wabash River) 1979 157,935 - 
Indianapolis, IN (Warfleigh Section) 
(White River) 1976 153,410 - 
Island Levee, IN (Wabash River) 1979 355,963 - 
Lewisport, KY - - - 
New Harmony Bridge, IL & IN (Wabash River)' 1959 - - 
Newport-Wilder, KY - - - 
Owensboro, KY - - - 
Salyersville, KY (Licking River) 1946 12,000 - 
Smithland, KY - - - 
Vincennes, IL (Wabash River) 1964 - - 
West Point, KY - 4,490 - 
Reservoirs: 
Active - no FY 1987 expenditure 
Camp Ground Lake, KY (Salt River) 1983 160,773- 
Inactive: 
Big Pine Lake, IN (Wabash River) 1977 1,270,590 - 
Big Walnut Lake, IN (Wabash River) 1980 1,009,188 
Booneville Lake, KY (Kentucky River) 1976 1,038,595 - 
Downeyville Lake, IN (Wabash River) - - 
Eagle Creek Lake, KY 1975 702,471 - 
Falmouth Lake, KY (Licking River) 1981 944,386 - 
Lafayette Lake, IN (Wabash River) 1977 1,200,920 - 
Louisville Lake, IL (Wabash River) 1983 2,355,395 - 
Mining City Lake, KY (Green River) - 350,474 - 
Red River Lake, KY (Kentucky River) 1976 1,794,308 - 
i All projects are on Ohio River unless otherwise noted. 
: Authorized by Chief of Engineers under Section 205, 1948 
Flood Control Act, as amended. 
$ Cost includes $161,098 cash contribution consisting of 
$105,118 from the City of Frankfort, KY and $55,980 from the 
Commonwealth of Kentucky. 
' Cost includes $1,716,301 cash contribution from City of 
Louisville, KY. 
8 Cost shown are for Levee only. Does not included costs for 
pump plants. 
6 The Water Resources Development Act of 1974 modified the 
Newburgh Locks & Dam project to include the bank protection 
works at Newburgh, IN. 
' Partially completed to form a useful unit. Remaining portion 
of project deauthorized. 
8 Partially completed to form a useful unit. Remaining portions 
of project are active and inactive. 
* Advance Engineering and Design funded with General 
Investigations Appropriation. 
24-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 24-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report For Deauthorized Expended Expended 
Flood Control - Local Protection 
Adams Levee, IN (Wabash River) - 1978 $ 
Alton, IN - 1977 
Anderson, IN (White River) 1940 1986 5,724 
Aurora, IN - 1977 35,420 
Bellevue, KY - 1977 19,023 
Bonpas Creek, IL (Wabash River) - 1981 
Bromley, KY - 1977- 
California (Cincinnati) OH - 1977 16,465- 
Carrollton, KY - 1977 9,713- 
Caseyville, KY - 1986- 
Cave-in-Rock, IL - 1977- 
Cincinnati, OH (Unit 2) - 1977- 
Cincinnati, OH (Unit 4) - 1977- 
Cleves, OH - 1977 6,343- 
Clinton, IN -1977 6,848 
Cloverport, KY - 1986- 
Concordia, KY - 1986 
Deer Creek, Prairie, Levee, IN - 1977 
Derby, IN - 1977 
Elizabethtown,, IL - 1977 
Fletcher & Sunshine Gardens Levee, IN - 1977 3,361 
Grandview, IN - 1977 8,497 
Honey Creek Levee, IN - 1977 
Leavenworth, IN - 1977 
Levee Unit 1, Eel River, IN - 1977 
Levee Unit 2, Eel River, IN - 1977 
Levee Unit 2, East Fork White River, IN - 1977 
Levee Unit 3, East Fork White River, IN 1938 1977 275 
Levee Unit 1, IL (Wabash River) 1973 1986 60,000 
Levee Unit 1, Little Wabash River, IL - 1977 
Levee Unit 2, Little Wabash River, IL - 1977 
Levee Unit 2, Wabash River, IL - 1977 
Levee Units 3 and 4, Wabash River, IL 1938 1977 216 
Levee Unit 6, Wabash River, IL - 1977 9,922 
Levee Unit 17, Wabash River Basin, IN - 1977 
Levee Unit 1, White River, IN - 1977- 
Levee Unit 7, White River, IN - 1977- 
Levee Unit 9, White River, IN - 1977- 
Levee Unit 10, White River, IN - 1977 
Louisville, KY (Partial) - 1986 
Ludlow, KY - 1977 14,503 
Madison, IN - 1977 - - 
Mauckport, IN - 1977- - 
Marion, IN (Wabash River) 1979 1986 209,975- 
McGinnis Levee, IN 1950 1977 71,049 
Metropolis, IL - 1986 10,575 
Milton, KY - 1977 - - 
Moscow, OH - 1977 - - 
New Amsterdam, IN - 1977 - - 
New Harmony, IN - 1977- - 
New Richmond, OH - 1977 7,104 
Orleans, IN 1972 1977 13,158- 
Patriot, IN - 1977- 
Prestonville , KY - 1977- 
Raccoon Creek Levee, IN - 1977- 
Rising Sun, IN - 1977- 
Rockport, IN - 1977- 
Rome, IN - 1977- 
Shawneetown, IL - 1986 25,367- 
Shoals, IN (East Fork White River) 1938 1977 
Shufflebarger Levee, IN 1950 1977 64,487- 
Sugar Creek Levee, IN 1961 1977 28,061 
Terre Haute, IN - 1997 
Tolu, KY - 1986 
Tri Pond Levee, IL 1972 1977 65,510 
Troy, IN - 1977 
Utica, IN - 1978 
Vevay, IN - 1977 
Vincennes, IN (Partial) 1964 1986 
Westport, KY - 1977 
Flood Control - Reservoirs 
Big Blue Lake, IN 1980 1981 1,079,867 
Clifty Creek Lake, IN 1979 1981 1,016,358 
Helm Lake, IL 1976 1981 41,616 
Lincoln Lake, IL 1979 1981 1,331,844 
Metamora Lake, IN - 1977 1 
24-22

TABLE 24-H NAVIGATION LOCKS AND DAMS 
PRINCIPAL FEATURES - GREEN & BARREN RIVERS 
AND KENTUCKY RIVER NAVIGATION SYSTEMS 
Lock Dimensions 
Miles Greatest Length 
Lock above Available Upper Depth of Year 
and Mouth of Distance from Width of For Full Normal Pool Miter Sills Character of Percent Opened to Cost of 
Dam River Nearest Town Chamber Width Lift Elevation Upper Lower Foundation Complete Navigation Lock and Dam 
(feet) (feet) (feet msl) (feet) (feet) 
CONSTRUCTION OF LOCKS AND DAMS, OHIO RIVER - For report on this improvement see this heading under Ohio River. 
GREEN AND BARREN RIVERS, KY (See Section 2 of Text) 
Green 
River 
New 
New 
9.1 
63.1 
108.5 
149.0 
168.1 
181.7 
Spottsville, KY 
0.3 miles below 
Calhoun, KY 
0.3 miles below 
Rochester, KY 
Woodbury, KY 
0.3 miles below- 
Glenmore, KY 
2.8 miles above 
Brownsville, KY 
Barren 
River 
15.0 " 0.3 miles above 
Greencastle, KY 
84.0 
84.0 
35.8 
35.8 
56.0 
36.0 
56.0 
600.0 
600.0 
137.5 
138.0 
360.0 
145.0 
360.0 
11.8' 
14.3 
170 
16.4 
15.2 
9.2 
349.1 
363.4 
380.4 
396.8 
412.0' 
421 1 
Barren 
River 
15.2 412 0 
12.1 
15.0 
73 
7.1 
12 0 
80 
11 3 
11.7 
56 
6.5 
9.3 
88 
Shale and Coal 
Shale 
Rock 
Rock 
Piles and Rock 
Gravel 
12.0 9 3 
100 
100 
100 
100 
100 
100 
1956' 
1956' 
1836' 
1839' 
1905' 
1905' 
$5,101,978' 
4,799,271' 
121,377 
125,718 
1,020,868" 
168,415 
100 1934 871,565" 
KENTUCKY RIVER, KY (See Section 3 of Text) 
Kentucky 
River 
1 4 0 3.8 miles above 
Carrollton, KY 
2 31.0 Lockport, KY 
3 42.0 Gest, KY 
4 65.0 1.0 mile below 
Frankfort, KY 
5 82.2 2.8 miles below 
Tyrone, KY 
6 96.2 21.6 miles below 
High Bridge, KY 
7 117.0 0.8 mile below 
High Bridge, KY 
8 139.9 4.7 miles above 
Camp Nelson, KY 
9 157.5 Valley View, KY 
10 176.4 1.0 mile below 
Ford, KY 
11 201.0 17.2 miles below 
Irvine, KY 
12 220.0 Ravenna, KY 
13 239.9 2.2 miles below 
Willow, KY 
14 249.0 Heidelberg, KY 
At normal pool Dam 48, Ohio River, Elev 337.3, Green 
River datum (Elev. 338.0 Ohio River datum) 
' New Lock 1 placed in operation May 25, 1956; old Dam 
1, completed 1835-40, replaced with new cellular concrete 
masonry dam constructed 1970 71 with O&M General funds at 
cost of $822,000. 
' Does not include $179,110 cost of old Lock and Dam 1. 
New Lock and Dam 2, placed in operation June 18, 1956 
Does not include $295,696 cost of old Lock and Dam 2 
SOperation discontinued September 30, 1981. 
SBreaching of dam on May 24, 1965, stopped through traffic 
to Bowling Green, KY. 
* With movable A frame crest 3 feet high. 
' Operation discontinued Aug. 1, 1951. 
SDoes not include $179,434 cost of old Lock and Dam 5 
n Distance from mouth of Green River is 164.5 miles. Lock 
closed to navigation as the result of loss of pool at Green River 
Lock and Dam 4 on May 24, 1965. 
" Includes $729,269 for new large lock completed in 1934 
" At normal pool McAlpine Dam, Ohio River elev 421 8 Kentucky 
River datum (Elev. 420 Ohio River datum). 
" Reconstruction completed by United States in 1882 
S Built by State of Kentucky. Cost given is for repairs by 
United States to Locks and Dams 1 through 5. Original construc 
tion costs to State were: L&D 1, $220,300; L&D 2, $151,983; 
L&D 3, $135,857; L&D 4, $131,607; and L&D 5, $137,436 
1 Lock was closed to traffic and placed in caretaker status 
in September 1982. 
C3 
Kentucky 
River 
0
CI) 
38 0 
38 0 
38 0 
38 0 
38 0 
52 0 
52 0 
52 0 
52 0 
52.0 
52.0 
52 0 
52 0 
52.0 
145 0 
145.0 
145.0 
145 0 
145.0 
147.0 
147 0 
146 0 
148 0 
148 0 
148 0 
148 0 
148.0 
148 0 
8.2 
13 9 
13.2 
132 
15.0 
14 0 
153 
187 
173 
170 
18 0 
170 
18 0 
170 
430 0 
443 9 
457 1 
470 3 
485 3 
4993 
514 6 
533 6 
550 6 
567 6 
585.6 
602.6 
620 6 
637 6 
8.2" 
76 
86 
64 
10 0 
94 
91 
10 6 
10 0 
9.0 
100 
96 
96 
86 
14 8 
61 
65 
74 
65 
64 
69 
60 
66 
60 
60 
60 
60 
60 
Rock and Clay 
Rock 
Rock 
Rock 
Rock 
Rock and Piles 
Rock 
Rock 
Rock 
Rock 
Rock 
Rock 
Rock 
Rock 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
1839' 
1839" 
1844" 
1844' 
1844'"' 
1894" 
1897" 
1900" 
1907'1 
1907" 
1906" 
1910'1 
1915" 
1917" 
1,350,385' 
314,847 
290,788 
275,463 
237,646 
221,500 
296,593 
425,693 
461,476 
392,902

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 24-I OHIO RIVER BASIN 
TOTAL COST OF BASIN PLAN 
(See Section 27 of Text) 
LOCAL PROTECTION 
Type of Estimated Cost2 
Project and Status' Construction Federal Non-Federal Total 
Completed: 
Barnett Creek, KY (Rough River s 
Brookport, IL5 
6 
Cannelton, IN5' 
Cincinnati, OH5 
Covington, KY5 ' 
Delphi, IN (Wabash River)' 10 
England Pond Levee, IL (Wabash River)1 
Frankfort, KY (Kentucky River) 
North Frankfort5 
Golconda, IL5 
12 
Harrisburg, ILs5 10o 
Hawesville, KY 5 13 
Jackson, KY (Kentucky River) ' 
Jeffersonville-Clarksville, IN7 
Lawrenceburg, IN5 
Louisville, KY5 " 
14 
Mason J. Niblack Levee, IN 
(Wabash Rivera)' 
New Albany, IN5 
8 
New Harmony Bridge, IL and IN 
(Wabash River)a' 
Newport, KY5 ' 
Paducah, KY5 ' 
Reevesville, IL (Cache River)' " 
Rochester and McCleary's Bluff Levee, IL 
(Wabash River)11 
Rough River, KY5 ' 
Sturgis, KY (Tradewater River)11 
Taylorsville, KY (Salt River) 16 
Tell City, IN5' 14 
Uniontown, KY5 
17 
Vincennes, IN (Wabash River)' 
(completed portion) 
West Terre Haute, IN (Wabash River) 
Active: 
Dayton, KY'4 
Evansville, IN'4 
Frankfort, KY (Kentucky River) 
South Frankfort5 
Russell & Allison Levee, IL 
(Wabash River)' 
Inactive: 
Frankfort, KY (Kentucky River) 
Benson Creeks 
Greenfield Bayou Levee, IN (Wabash River)' 
Island Levee, IN (Wabash River)' 
Lewisport, KY5 
New Harmony Bridge, IL and IN 
(Wabash River)a' 
Owensboro, KY5 
Smithland, KY5 
Wilders, KY 
Channel improvement 
Wall and levee 
Wall and levee 
Wall and barrier dam 
Wall and levee 
Levee 
Levee 
Wall and levee 
Wall and levee 
Wall and levee 
Levee 
Cutoff channel 
Wall and levee 
Wall and levee 
Wall and levee 
Levee and pump plants 
Wall and levee 
Bank Protection 
Wall and levee 
Wall and levee 
Levee 
Levee 
Channel improvement 
Levee 
Levee 
Wall and levee 
Levee 
Wall and levee 
Levee 
Wall and levee 
Wall and levee 
Wall 
Levee 
Wall and levee 
Levee 
Levee 
Wall and levee 
Bank protection 
Wall and levee 
Wall and levee 
Wall and levee 
597,493 
2,068,391 
10,150,935 
7,862,937 
144,563 
734,498 
2,960,970 
565,333 
870,015 
969,318 
130,952 
4,226,361 
2,473,414 
25,005,137 
4,337,617 
5,375,471 
297,624 
7,512,987 
4,761,551 
600,300 
1,079,236 
1,826,778 
378,050 
932,229 
1,070,926 
3,308,941 
1,095,704 
13,115,900 
55,692,700 
7,120,000 
8,500 
29,105 
1,309,146 
1,051,102 
17,164 
107,000 
272,100 
10,900 
20,000 
42,593 
3,000 
590,888 
284,725 
1,716,301 
p - 
605,993 
2,097,496 
11,460,081 
8,914,039 
161,727 
841,498 
3,233,070 
576,233 
890,015 
1,011,911 
133,952 
4,817,249 
2,758,139 
26,721,438 
109,200 4,446,817 
740,000 6,115,471 
- 297,624 
298,506 7,811,493 
232,000 4,993,551 
40,000 640,300 
100,000 1,179,236 
93,000 1,919,778 
63,309 441,359 
32,707 964,936 
72,153 1,143,079 
285,000 3,593,941 
150,000 1,245,704 
2,043,000 
7,982,000 
660,000 
15,158,90018 
63,674,700"8 
7,780,00019 
19,400,000 2,340,000 21,740,00020 
3,340,000 
4,600,000 
4,630,000 
610,000 
664,376 
886,000 
864,000 
10,800,000 
1,150,000 
1,087,000 
528,000 
243,000 
99,000 
195,000 
414,000 
959,000 
4,490,00021 
5,687,00022 
5,158,00022 
853,00023 
763,37624 
1,081,000 
1,278,000 
11,759,00025 
24-24

LOUISVILLE, KY. DISTRICT 
TABLE 24-I 
CONTINUED 
OHIO RIVER BASIN 
TOTAL COST OF BASIN PLAN 
(FLOOD CONTROL) 
(See Section 27 of Text) 
LOCAL PROTECTION 
Type of Estimated Cost' 
Project and Status' Construction Federal Non-Federal Total 
Deauthorized August 5, 1977 under 
Section 12, Water Resources Development 
Act of 1971 (Public Law 93-251): 
Alton, IN 
Bellevue, KY 
Bromley, KY 
Carrollton, KY 
Cave-in-Rock, IL 
Cincinnati, OH (Unit 2) 
Cincinnati, OH (Unit 4) 
Cleves, OH 
Clinton, IN (Wabash River) 
Deer Creek Prairie Levee, IN 
(Wabash River) 
Derby, IN 
Elizabethtown, IL 
Fletcher and Sunshine Gardens Levee, 
IN (Wabash River) 
Grandview, IN 
Honey Creek Levee, IN 
Leavenworth, IN 
Levee Unit 1, Eel River, IN 
Levee Unit 2, Eel River, IN 
Levee Unit 1, Little Wabash River, IL 
Levee Unit 2, Little Wabash River, IL 
Levee Unit 6, Wabash River, IL 
Levee Unit 17, IN 
Levee Unit 1, White River, IN 
Levee Unit 2, White River, IN 
Levee Unit 7, White River, IN 
Ludlow, KY 
Madison, IN 
Mauckport, IN 
McGinnis Levee, IN (Wabash River) 
Milton, KY 
Moscow, OH 
New Amsterdam, IN 
New Harmony, IN (Wabash River) 
New Richmond, OH 
Patriot, IN 
Prestonville, KY 
Raccoon Levee, IN (Wabash River) 
Rising Sun, IN 
Rockport, IN 
Rome, IN 
Shufflebarger Levee, IN 
(Wabash River) 
Sugar Creek Levee, IN 
(Wabash River) 
Tri-Pond Levee, IL (Wabash River) 
Troy, IN 
Vevay, IN 
Westport, KY 
Levee 
Wall and Levee 
Wall and Levee 
Wall and Levee 
Levee 
Wall and Levee 
Wall 
Levee 
Levee 
Levee 
Wall and Levee 
Wall and Levee 
Levee 
Levee 
Levee 
Wall and Levee 
Levee 
Levee 
Levee 
Levee 
Levee 
Levee 
Levee 
Levee 
Levee 
Wall and Levee 
Levee 
Levee 
Levee 
Wall 
Levee 
Levee 
Levee 
Wall and Levee 
Levee 
Wall and Levee 
Levee 
Wall and Levee 
Wall and Levee 
Levee 
Levee 
Levee 
Levee 
Wall and Levee 
Levee 
Wall 
$ 255,000 
1,570,000 
1,250,000 
2,220,000 
661,000 
16,800,000 
14,900,000 
1,240,000 
77,000 
213,000 
553,000 
559,000 
548,000 
580,000 
653,000 
1,470,000 
204,000 
2,090,000 
2,850,000 
3,410,000 
1,160,000 
1,580,000 
2,180,000 
724,000 
1,490,000 
2,540,000 
3,820,000 
506,000 
1,820,000 
2,480,000 
1,170,000 
476,000 
616,000 
3,200,000 
753,000 
1,710,000 
426,000 
896,000 
466,000 
359,000 
2,380,000 
418,000 
2,050,000 
502,000 
1,170,000 
1,610,000 
$ 40,000 
400,000 
925,000 
97,000 
125,000 
2,900,000 
621,000 
67,000 
9,000 
10,000 
67,000 
153,000 
26,000 
133,000 
32,000 
266,000 
40,000 
715,000 
164,000 
136,000 
56,000 
118,000 
116,000 
73,000 
88,000 
745,000 
360,000 
105,000 
104,000 
41,000 
372,000 
13,000 
25,000 
720,000 
372,000 
55,000 
37,000 
280,000 
133,000 
67,000 
90,000 
29,000 
191,000 
133,000 
146,000 
41,000 
$ 295,000 
1,970,000 
2,175,000 
2,317,000 
786,000 
19,700,000 
15,521,000 
1,307,000 
86,000 
223,0003 
620,000 
712,000 
574,000' 3 
713,000 
685,000 
1,736,000 
244,000 
2,805,000 
3,014,00026 
3,546,00027 
1,216,000 
1,698,00027 
2,296,00026 
797,00026 
1,578,00026 
3,285,000 
4,180,000 
611,000 
1,924,000 
2,521,000 
1,542,000 
489,000 
641,000 
3,920,000 
1,125,000 
1,765,000 
463,00023 
1,176,000 
599,000 
426,000 
2,470,000 
447,00025 
2,241,00027 
635,000 
1,316,000 
1,651,000 
24-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 24-I 
CONTINUED 
OHIO RIVER BASIN 
TOTAL COST OF BASIN PLAN 
(FLOOD CONTROL) 
(See Section 27 of Text) 
LOCAL PROTECTION 
Type of Estimated Cost2 
Project and Status' Construction Federal Non-Federal Total 
Deauthorized November 6, 1977 under 
Section 12, Water Resources Development 
Act of 1974 (Public Law 93-251) 
Aurora, IN Wall and Levee $4,300,000 $1,190,000 $5,490,000 
California (Cincinnati), OH Wall and Levee 1,750,000 720,000 2,470,000 
Deauthorized October 3, 1978 under 
Section 12, Water Resources Development 
Act of 1974 (Public Law 93-251) 
Adams Levee, IN (Wabash River) Levee 292,000 14,000 306,00027 
Utica, IN5 Levee 1,570,000 120,000 1,690,000 
Deauthorized May 6, 1981 under 
Section 12, Water Resources Development 
Act of 1974 (Public Law 93-251) 
Bonpas Creek, IL (Wabash River)5 Channel 1,080,000 630,000 1,710,00027 
improvement 
Deauthorized November 17, 1986 under 
Section 12, Water Resources Development 
Act of 1974 (Public Law 93-251) 
Caseyville, KY5 Levee 396,000 35,000 431,000 
Cloverport, KY5 Wall and Levee 728,000 193,000 921,000 
Concordia, KY5 Levee 590,000 55,000 645,000 
Metropolis, IL5 Wall and Levee 3,070,000 431,000 3,501,000 
Shawneetown, IL5 Wall and Levee 1,810,000 361,000 2,171,000 
Tolu, KY5 Levee 303,000 35,000 338,000 
Vincennes, IN (Wabash River)5 Wall and Levee 3,340,000 - 3,340,00027 
(Uncompleted Portion) 
West Point, KY5 Wall and Levee 3,283,000 400,000 3,683,00023 
1 All projects are on an Ohio River unless otherwise noted. 
9 Latest cost estimate revision 1954 unless otherwise noted. 
$ Part of Rough River Reservoir and Channel Improvement 
Project, KY. 
' Details of this project are in individual report. 
s Also see "Other authorized flood control projects." 
* See Annual Report for 1958 for details. 
' See Annual Report for 1959 for details. 
8 See Annual Report for 1957 for details. 
' See Annual Report for 1965 for details. 
1o See Annual Report for 1953 for details. 
11 See Annual Report for 1972 for details. 
12 See Annual Report for 1960 for details. 
1 See Annual Report for 1955 for details. 
14 See Annual Report for 1962 for details. 
15 Substitute project for Belknap, Karnak, and Ullin, IL, complete. 
See Annual Report for 1954 for details. 
16 See Annual Report for 1952 for details. 
17 See Annual Report for 1956 for details. 
" Latest cost estimate revision 1986. 
19 Latest cost estimate revision 1984. 
20 Latest cost estimate revision 1983. 
21 Latest cost estimate revision 1976. 
22 Latest cost estimate revision 1978. 
23 Latest cost estimate revision 1960. 
24 Latest cost estimate revision 1971. 
25 Latest cost estimate revision 1977. 
26 Latest cost estimate revision 1961. 
27 Latest cost estimate revision 1973. 
24-26

LOUISVILLE, KY. DISTRICT 
TABLE 24-I 
CONTINUED 
OHIO RIVER BASIN 
TOTAL COST OF BASIN PLAN 
(FLOOD CONTROL) 
(See Section 27 of Text) 
RESERVOIRS 
Tributary Basin Estimated Cost' 
Reservoirs Status Stream Federal Non-Federal Total 
Great Miami River: 
Brookville Lake, IN 2 
Metamora Lake, IN 
Green River: 
Barren River Lake, KY2 
Green River Lake, KY2 
Mining City Lake, KY 
Nolin Lake, KY2 
Rough River Kentucky2 
Kentucky River 
Booneville Lake, KY 
Buckhorn Lake, KY2 
Carr Fork Lake, KY2 
Licking River 
Cave Run Lake, KY2 
Falmouth Lake, KY 
Little Miami River: 
Caesar Creek Lake, OH2 
William H. Harsha 
Lake, OH2 
Mill Creek: 
West Fork of 
Mill Creek Lake, OH 2 
Wabash River: 
Cagles Mill Lake, IN2 
Cecil M. Harden Lake, IN2 
Monroe Lake, IN2 
Patoka Lake, IN2 
Complete 
Deauthorized 
Complete 
Complete 
Inactive 
Complete 
Complete 
Inactive 
Complete 
Complete 
Complete 
Inactive 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
East Fork of Whitewater 
River 
West Fork of Whitewater 
River 
Barren River 
Green River 
Green River 
Nolin River 
Rough River 
South Fork of Kentucky 
River 
Middle Fork of Kentucky 
River 
North Fork of Kentucky 
River 
Licking River 
Licking River 
Caesar Creek 
East Fork of Little Miami 
River 
West Fork of Mill Creek 
Mill Creek 
Raccoon Creek 
Salt Creek 
Patoka River 
$37,904,424 
35,300,000 
27,371,299 
33,422,329 
69,100,000 
17,193,381 
10,620,389 
60,700,000 
11,766,206 
50,854,826 
114,826,300 
125,000,000 
$7,578,738$ $ 45,483,162 
- 35,300,000' 
108,41865 
183,732' 
22,6125 
27,479,717 
33,606,061 
69,100,000' 
17,193,381 
10,643,001 
60,700,0006 
11,766,206 
50,854,826 
114,826,300' 
125,000,0008 
59,744,000 5,037,0009 64,781,000 
51,447,500 3,484,5009 54,932,000 
3,622,302 1,100,16110 4,722,463 
4,156,368 
6,633,812 
7,902,827 
106,8165 
353,9955 
8,666,76211 
4,263,184 
6,987,807 
16,569,589 
52,869,000 25,548,70012 78,417,700 
Latest cost estimate revision 1986 unless otherwise noted. 
Details of this project given in individual report. 
Cash contributions for water supply storage. 
Latest cost estimate revision 1954. 
For Code 713 recreation development. 
Latest cost estimate revision 1975. 
Includes $35,213,000 United States Forest Service cost. 
Latest cost estimate revision 1979. 
Reimbursement for water supply storage. 
o10 Includes $520,800 for non-Federal cost for sewer relocation 
and dam, $50,000 for contributed funds in fulfillment of project 
authorization, and $529,361 for Code 713 recreation 
development. 
11 Includes $7,797,604 cash contribution for storage for low-flow 
regulation and $869,158 for Code 713 recreation development. 
12 Includes $14,173,500 cash contribution for water supply 
storage, and $11,375,200 for initial recreation development. 
24-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 24-J WABASH RIVER BASIN 
TOTAL COST OF BASIN PLAN: 
(FLOOD CONTROL) 
(See Section 32 of Text) 
Type of 
Construction Estimated Cost 
Project or Stream Status Federal Non-Federal Total 
LOCAL PROTECTION 
Marion, IN Wall and Levee Inactive $ 3,900,000 $ 854,000 $ 4,754,0002 
RESERVOIRS 
Big Blue Lake, IN Big Blue River Deauthorized 87,200,000 53,846,000$ 141,046,0004 
Big Walnut Lake, IN Big Walnut Creek Inactive 81,800,000 45,069,000$ 126,869,0004 
Downeyville Lake, IN Flatrock and Little 
Flatrock Rivers Inactive 74,200,000 64,448,000 138,648,0001 
Helm Lake, IN Skillet Fork Deauthorized 25,171,000 14,829,000' 40,000,0008 
Louisville, Lake, IL Little Wabash River Inactive 113,000,000 14,435,0009 127,435,00010 
i Latest cost revision 1984 unless otherwise noted. 
4 Latest cost estimate revision 1977. 
a Includes $38,190,000 reimbursable by non-Federal interests 
for water supply and $15,656,000 reimbursable for initial recreation 
facilities. 
' Latest cost estimate revision 1979. 
a Includes $26,663,000 reimbursable by non-Federal interests 
for water supply and $18,406,000 reimbursable for initial recreation 
facilities. 
* Includes $53,084,000 reimbursable by non-Federal interests 
for water supply, $8,749,000 reimbursable for initial recreation 
facilities. 
' Includes $12,696,000 reimbursable by non-Federal interests 
for water supply and $2,133,000 for recreation facilities. 
8 Latest cost estimate revision 1975. 
s Includes $8,402,000 reimbursable by non-Federal interests 
for water supply and $6,033,000 reimbursable for initial recreation 
facilities. 
10 Latest cost estimate revision 1982. 
24-28

LOUISVILLE, KY. DISTRICT 
TABLE 24-K INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
(See Section 35 of Text) 
Date of 
Local Protection Projects Inspection 
Brevoort Levee, IL May 1987 
Brookport, IL Oct 1986 
Cache River Levee, IL Oct 1986 
Cannelton, IN Nov 1986 
Cincinnati, OH May 1987 
Covington, KY Nov 1986 
Dayton, KY May 1987 
Delphi, IN Mar 1987 
England Pond Levee, IL May 1987 
Evansville, IN Jun 1987 
Frankfort, KY, North Frankfort Dec 1986 
Gill Township Levee, IN Apr 1987 
Golconda, IL Oct 1986 
Harrisburg, IL Oct 1986 
Hawesville, KY Nov 1986 
Indianapolis, IN Mar 1987 
Jeffersonville-Clarksville, IN Dec 1986 
Lawrenceburg, IN May 1987 
Lebanon Junction, KY Dec 1986 
Levee Unit No. 5, 
Wabash River, IN Oct 1986 
Levee Unit No. 8, IN Apr 1987 
Louisville, KY Sep 1987 
Lyford Levee, IN Apr 1987 
Mason J. Niblack Levee, IN May 1987 
Mt. Carmel, IL Oct 1986 
Muncie, IN Mar 1987 
New Albany, IN Dec 1986 
Newport, KY Nov 1986 
Paducah, KY Oct 1986 
Reevesville, IL Oct 1986 
Rochester-McCleary's Bluff 
Levee, IL Oct 1986 
Rosiclare, IL Oct 1986 
Shawneetown, IL Oct 1986 
Sturgis, KY May 1987 
Taylorsville, KY Dec 1986 
Tell City, IN Nov 1986 
Terre Haute (Conover Levee), IN Apr 1987 
Uniontown, KY May 1987 
Vincennes, IN May 1987 
West Terre Haute, IN Apr 1987 
24-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 24-K INSPECTION OF COMPLETED 
CONTINUED FLOOD CONTROL PROJECTS 
(See Section 35 of Text) 
Dates of 
Channel Improvements Inspection 
Canoe Creek, Henderson, KY Jan 1987 
Chaplin River, Perryville, KY Sep 1986 
Cypress Creek, McLean County, KY Jul 1987 
Eel River, Brazil Waterworks, IN Apr 1987 
English, IN (Little Blue River) Aug 1986 
Grassy Creek, Jackson County, IN Sep 1985 
Harrodsburg, KY (Town Creek) Sep 1986 
Indian Creek, Corydon, IN Jul 1986 
Jackson, KY (North Fork Kentucky River) Jul 1987 
Mill Creek, Jefferson County, KY Aug 1987 
Muscatatuck River, Crothersville, IN Sep 1986 
Neon-Fleming, KY Jun 1987 
Nicholasville (Town Fork) Vicinity, KY Sep 1986 
Panther Creek, Curdsville, KY Jul 1987 
Plum Creek, Spencer County, KY Aug 1986 
Portland, IN (Salamonie River) Mar 1987 
Rough River, Hartford, Ohio County, KY Jul 1987 
Saline River and Tributaries, IL Ot 1986 
Triplett Creek, Morehead, KY Jul 1987 
Troublesome Creek, Hindman, KY Jun 1987 
Whitesburg, KY (North Fork Kentucky River) Jun 1987 
Bank Revetments 
Eighteen Mile Island, Oldham Co., KY Aug 1986 
Great Miami River, Sidney, OH Mar 1987 
Green River, Calhoun, KY Jan 1986 
Licking River, Butler, KY Nov 1986 
Lusk Creek, Golconda, IL Oct 1986 
Little Miami River, Indian Hill, OH May 1987 
Little Miami River, Milford, OH May 1987 
Ohio River, Brandenburg, KY Jul 1986 
Ohio River, Cloverport, KY Jul 1987 
Ohio River, Daviess Co., KY Jul 1987 
Ohio River, Fort Massac State Park, IL May 1986 
Ohio River, Hawesville, KY Jul 1987 
Ohio River, Lewisport, KY Jul 1987 
Ohio River, Madison, IN Sep 1986 
Ohio River, Moscow, OH Nov 1986 
Ohio River, Mount Vernon, IN May 1987 
Ohio River, Newburgh, IN Jun 1987 
Ohio River, Ohio Street, Evansville, IN Jun 1986 
Ohio River, Otter Creek Park, KY Sep 1987 
Ohio River, Rabbit Hash, Boone Co., KY May 1987 
Ohio River, Rockport Landing, IN May 1987 
Ohio River, Sellersburg, IN Sep 1986 
Ohio River, SR 66, Cannelton, IN Nov 1986 
Ohio River, Troy, IN May 1987 
Ohio River, Upper River Rd., Jefferson Co., KY Aug 1987 
Ohio River, Vanderburg Co., IN Jun 1987 
Patoka River at Jasper, IN Apr 1987 
Patoka River, Winslow, IN Apr 1987 
Stoner Creek, North Middletown, KY Aug 1987 
Wabash River near Merom, IN Apr 1987 
Wabash River, New Harmony, IN Jan 1985 
White River, Brownstown, IN Apr 1987 
White River, Pike Co., IN Apr 1987 
Whitewater River, Levee Rd., near Brookville, IN Jan 1986 
WTP, Great Miami River, Ross, OH May 1987 
24-30

LOUISVILLE, KY. DISTRICT 
TABLE 24-L FLOOD CONTROL WORK 
UNDER SPECIAL AUTHORIZATION 
(See Section 37 of Text) 
Fiscal Year Cost 
Jobs Bill' Total 
Flood Control: 
Buckhorn Creek, Campbellsville, KY2 $ 27,808 
Camp Run, Sellersburg, IN 2 - 1,333 
Canoe Creek at Henderson, KY6 $ 580 76,557 
Cross Creek, Paducah, KY2 - 6,962 
Dry Run, South Lebanon, OH2 -16 
Great Miami River, Port Jefferson, OH' - 9,672 
Lancassage Creek, Clark Co., IN4 - 55 
Licking River, Salyersville, KY3 - 35,986 
Little Beaver Creek, Kettering, OH3 - 67 
Lyford Levee, IN' - 49,920 
Pipe Creek, Alexandria, IN' -12,504 
Salamonie River, Blackford County, IN 2 -7,500 
Sugar Creek, Bellbrook, OH 3 - 17,305 
Whitewater River, Hagerstown, IN4 - 4,330 
Snagging and Clearing for Flood Control: 
Lick Creek, Hartford City, IN6 - 130,173 
Pigeon Creek, Vanderburgh County, IN 2 - 27,500 
Salamonie River, Montpelier, IN4 - 1,395 
Emergency Bank Protection: 
Embarras River, Charleston, IL2 - 7,500 
Four Mile Creek, Butler County, OH2 - 7,495 
Ohio River, Brandenburg, KY2 - 10,921 
Ohio River, Cave-in-Rock, IL3 - 7,500 
Ohio River, Chickasaw Park, Louisville,KY2 - 7,500 
Ohio River, Owensboro, KY2 - 5,496 
Ohio River, Union County, KY' - 7,500 
Whitewater River, Cedar Grove, IN2 - 1,465 
Whitewater River, Laurel, IN' -653 
' Productive Employment Appropriation Act (PL 98-8) of 1983 
2 Reconnaissance Study 
' Detail Project Report 
4 Plans and Specifications 
b Construction Funds Received 
6 Construction Completed 
24-31

HUNTINGTON, WV, DISTRICT * 
All cost and financial statements for projects are 
listed at the end of this chapter. All other tables are 
referenced in the text and also appear at the end of this 
chapter. 
The Huntington District includes central and 
southeastern Ohio, all of West Virginia except the 
northern panhandle and northeastern portion, the 
eastern portion of Kentucky, a portion of midwestern 
Virginia, a very small portion of midwestern Virginia, a 
very small portion of northwestern North Carolina, 
embraced in the drainage basin of the Ohio River and its 
tributaries from approximate river mile 127 (below 
Pittsburgh, Pa.) to approximate river mile 438, 
immediately upstream from Foster, KY. The drainage 
area of the Huntington District is approximately 44,914 
square miles. 
IMPROVEMENTS 
1. Construction of Locks and 
Dams on Ohio River ......................................... 25-2 
2. Kanawha River, WV ........................................ 25-2 
3. Open Channel Work, Ohio River .................... 25-2 
4. Other Authorized 
Navigation Projects .......................................... 25-2 
Flood Control 
5. Alum Creek Lake, OH ..................................... 25-2 
6. Beech Fork Lake, WV ...................................... 25-3 
7. Bluestone Lake, Ohio 
River Basin, W V .............................................. 25-3 
8. Burnsville Lake, Ohio 
River Basin, W V .............................................. 25-3 
9. Deer Creek Lake, 
Ohio River Basin, OH ...................................... 25-3 
10. Delaware Lake, Ohio 
River Basin, OH .......... :................................... 25-4 
11. Dewey Lake, Ohio 
River Basin, KY .............................................. 25-4 
12. Dillon Lake, Ohio 
River Basin, OH .............................................. 25-4 
13. East Lynn Lake, 
Ohio River Basin, WV ...................................... 25-5 
14. Fishtrap Lake, Ohio River Basin, KY ............ 25-5 
15. Grayson Lake, KY ............................................ 25-5 
16. John W. Flannagan Dam and 
Reservoir, Ohio River Basin,VA ...................... 25-6 
17. Levisa and Tug Forks of the 
Big Sandy River and Cumberland 
River, KY, WV and VA .................................... 25-6 
18. M assillon, OH .................................................. 25-6 
19. Muskingum River Lakes, OH .......................... 25-6 
20. Newark, OH ..................................................... 25-7 
21. North Branch of Kokosing 
River Lake, OH ................................................ 25-7 
22. North Fork of Pound River Lake, VA ............. 25-8 
23. Ohio River Basin (Huntington District) ......... 25-8 
24. Paint Creek Lake, Ohio 
River Basin, Ohio ............................................. 25-8 
25. Paintsville Lake, KY ........................................ 25-8 
26. R.D. Bailey Lake, WV ...................................... 25-9 
27. Roseville, OH ................................................... 25-9 
28. Summersville Lake, Ohio 
River Basin, W V .............................................. 25-9 
29. Sutton Lake, Ohio River Basin, WV ............... 25-9 
30. Tom Jenkins Dam, Ohio 
River Basin, OH ............................................. 25-10 
31. Yatesville Lake, KY ....................................... 25-10 
32. Inspection of Completed 
Flood Control Projects ................................... 25-10 
33. Flood Control Work Under 
Special Authorization ..................................... 25-11 
General Investigations 
34. Surveys ........................................................... 25-11 
35. Collection and Study of Basic Data ............... 25-11 
Tables 
Table 25-A 
Table 25-B 
Table 25-C 
Table 25-D 
Table 25-E 
Table 
Table 
Table 
25-F 
25-G 
25-H 
Cost & Financial Statement .......... 25-12 
Authorization Legislation .............. 25-17 
Other Authorized 
Navigation Projects ........................ 25-20 
Not Applicable 
Other Authorized Flood 
Control Projects ............................... 25-21 
Not Applicable 
Deauthorized Projects ..................... 25-22 
Inspection of Flood 
Control Projects ............................... 25-23 
25-1 
Navigation Page Page

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. CONSTRUCTION OF LOCKS AND 
DAMS ON THE OHIO RIVER 
See this heading under Chapter 22- Ohio River 
2. KANAWHA RIVER, WV 
Location. The Kanawha River is approximately 97 
miles in length and is formed by the junction of the New 
and Gauley Rivers, a short distance above Kanawha 
Falls, WV, and flows generally northwesterly to the 
confluence with the Ohio River at Point Pleasant, WV. 
Previous projects. For details of previous projects 
see the Annual Reports for 1875,1915 and 1938. 
Existing project. The existing project consists of 
three navigation structures on the Kanawha River. 
London Locks and Dam are located approximately 83 
miles above the mouth of the Kanawha River and 
approximately two miles downstream from Montgomery, 
WV. Marmet Locks and Dam are located approximately 
68 miles above the mouth of the Kanawha River at 
Marmet, WV. Winfield Locks and Dam are located 
approximately 31 miles above the mouth of the Kanawha 
River at Winfield, WV. Each structure has twin locks 
with usable dimensions of 56 feet by 360 feet. Another 
structure is located on the Ohio River at approximate 
river mile 279 and approximately nine miles below 
Gallipolis, OH. This structure has two parallel locks, the 
main lock is 110 feet by 360 feet. This system of locks and 
dams provides a navigable depth of nine feet from the 
mouth of the Kanawha River to a point approximately 91 
miles upstream. The existing project was completed at a 
cost of $23,403,201. Construction was initiated in 1931 
and completed in 1937. For further cost details see Table 
25-B, see also, Appendix C. Public Law 99-88 authorized 
the initiation of Engineering and Design and Real Estate 
Acquisition for Winfield Locks and Dam Replacement. 
Feasibility studies for modernization have been 
completed. The recommended plan includes construction 
of an additional lock chamber (800'x110') adjacent to the 
existing locks and continued use of the riverward lock 
chamber and the navigation dam. The annual estimate 
for new work is $153,000,000. 
Local cooperation. None required. 
Terminal facilities. There are 79 terminals along 
the Kanawha River located from the mouth of the river 
to 30 miles east of Charleston, WV. These terminals are 
constructed principally of steel and wood mooring piles 
and steel pile mooring cells. Seventeen of these terminals 
have railroad connections. One terminal, a paved wharf, 
is owned by the City of Charleston, WV. The remaining 
terminals are privately owned. The principal 
commodities handled are coal, chemicals, acids, cement, 
gasoline and oil, and sand and gravel. For further details 
see the 1962 Annual Report. 
Operations during the fiscal year. The Locks and 
Dams were operated as required and necessary repairs 
and improvements were made to the locks and dams as 
well as to the appurtenant structures and grounds. 
Channel inspections were conducted periodically. 
3. OPEN CHANNEL WORK, 
OHIO RIVER 
See this heading under Chapter 22 - Ohio River. 
4. OTHER AUTHORIZED 
NAVIGATION PROJECTS 
See Table 25-C. 
5. ALUM CREEK LAKE, OH 
Location. The damsite is located in Delaware 
County, OH, on Alum Creek, a tributary of Big Walnut 
Creek, approximately 26 miles above the mouth of Alum 
Creek and 15 miles north of Columbus, OH, and 
approximately 157 miles above the mouth of the Scioto 
River. 
Existing project. The existing project consists of a 
rolled earthfill dam 93 feet in height and 10,000 feet in 
length with a gate controlled spillway located in the right 
abutment. The reservoir provides a total storage of 
134,800 acre-feet and controls a drainage area of 
approximately 123 square miles. See also Appendix A. 
Construction of the dam and appurtenant works was 
initiated in August 1970 and completed in July 1974. The 
405 tracts of land required for the project have been 
acquired. The Federal cost of the project was 
$56,267,422. The Sponsor will reimburse the 
Government an estimated $27,880,000, exclusive of 
interest, for cost allocated to water supply. 
Local cooperation. For details of required local 
cooperation see the 1981 Annual Report. 
Operations and Maintenance. The entire project is 
complete. The project was operated for the benefit of flood 
control as required, and necessary repairs were made to 
the structure and appurtenances. During the fiscal year 
the project prevented flood damages estimated to be 
$4,077,000. To date, the project has prevented an 
estimated $42,359,000 in flood damages. 
25-2

HUNTINGTON WEST VIRGINIA DISTRICT 
6. BEECH FORK LAKE, WV 
Location. The damsite is located in Wayne County, 
WV., on Beech Fork Creek, a tributary of Twelvepole 
Creek, approximately four miles above the mouth of 
Beech Fork Creek and 20 miles above the confluence of 
Twelvepole Creek and the Ohio River. 
Existing project. The existing project consists of a 
rolled earth-fill dam 86 feet in height and 1,080 feet in 
length, an uncontrolled spillway landward of the left 
abutment of the dam with a control structure at the 
upstream end. The reservoir provides a total storage of 
37,540 acre-feet and controls a drainage area of 
approximately 78 square miles. Construction of the dam 
was initiated in December 1972 and completed in 
February 1977. See also Appendix A. The 485 tracts of 
land required for the project have been acquired. The full 
funding estimate for new work is $47,900,000. 
Local cooperation. None required. 
Operations during the fiscal year. New Work: 
Engineering activities for remaining work items 
continued. The project is essentially complete, except for 
remaining recreation facilities, landscaping and 
cleanup. 
Operations and maintenance. The project was 
operated for flood control as required and necessary 
repairs were made to the structure and appurtenances. 
The project prevented flood damages estimated at 
$104,000 during the fiscal year. To date the project has 
prevented an estimated $2,959,000 in flood damages. 
7. BLUESTONE LAKE, 
OHIO RIVER BASIN, WV 
Location. The damsite is located on the New River 
in Summers County, WV., approximately three miles 
above Hinton, WV and one mile from the confluence of 
the New and Greenbrier Rivers. The reservoir is located 
in Summers County, WV and Giles County, VA. 
Existing project. The existing project consists of a 
concrete gravity dam 180 feet in height and 2,048 feet in 
length. Appurtenant structures consist of a gated 
spillway 790 feet in length located in the channel section 
of the dam. The stilling pool is formed by a 23 foot 
highweir located 364 feet downstream of 16 gated sluices 
through the spillway section and discharging into the 
stilling pool. Penstocks were installed at the time of 
construction to permit the future installation of hydropower. 
The reservoir provides for a total storage of 
631,000 acre-feet. See also Appendix A. Construction of 
the dam was initiated in January 1942 and completed in 
April 1952. A total of 338 tracts of land was acquired for 
the project. The Federal cost of the project was 
$29,458,652, which includes expenditures under the 
recreation at completed projects program. For further 
details see the 1939 and 1962 Annual Reports. 
Local cooperation. None required. 
Operations during the fiscal year. Operations 
and Maintenance. The entire project is complete. The 
reservoir was operated for flood control as required and 
necessary repairs were made to the structure and 
appurtenances. The project prevented flood damages 
estimated to be $25,380,000 during the fiscal year. To 
date, the project has prevented an estimated 
$582,821,000 in flood damages. 
8. BURNSVILLE LAKE, 
OHIO RIVER BASIN, WV 
Location. The damsite is located in Braxton County 
WV, on the LIttle Kanawha River, approximately two 
miles above Burnsville, WV, and 124 miles above the 
confluence of the Little Kanawha River and the Ohio 
River. 
Existing project. The existing project consists of an 
earth embankment dam 80 feet in height and 1,000 feet 
in length with a gated spillway in the left abutment. The 
outlet works is an integral part of the spillway, 
consisting of five sluice gates and one low flow sluice. The 
reservoir provides for a total storage of 65,400 acre-feet 
and controls a drainage area of approximately 165 
square miles. Construction of the dam was initiated in 
June 1973 and completed in February 1976. See also 
Appendix A. The 357 tracts of land required for the 
project have been acquired. The Federal cost of the 
project was $56,195,839. 
Local cooperation. None Required. 
Operations during the fiscal year. The project is 
completed. The project was operated for flood control as 
required and necessary repairs were made to the 
structure and appurtenances. The project prevented 
flood damages estimated at $243,000 during the fiscal 
year. To date, the project has prevented an estimated 
$22,699,000 in flood damage. 
9. DEER CREEK LAKE, 
OHIO RIVER BASIN, OH 
Location. The damsite is located in Pickaway 
County, approximately seven miles south of Mount 
Sterling, OH on Deer Creek, a tributary of the Scioto 
River, approximately 21 miles above the mouth of Deer 
Creek and approximately 106 miles above the mouth of 
the Scioto River. 
25-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Existing project. The existing project consists of a 
rolled earth-filled dam 93 feet in height and 3,880 feet in 
length, a 741 foot concrete gravity channel section 
controlled by three tainter gates, an outlet works 
consisting of five gated sluices through a concrete 
spillway section discharging into a stilling basin and an 
earth dike 15 feet by 4,600 feet in a saddle located 
approximately four miles southwest of the damsite. The 
reservoir provides a total storage of 102,540 acre-feet and 
controls a drainage area of approximately 278 square 
miles. Construction of the dam was completed in May 
1968. The 138 tracts of land required for the project have 
been acquired. For further project details see the 1965 
Annual Report. See also Appendix A. The Federal cost of 
the project is $20,406,545, including expenditures under 
the recreation at completed projects program. 
Local cooperation. For details of required local 
cooperation see the 1981 Annual Report. 
Operations during the fiscal year. Operations 
and Maintenance. All construction work is complete. 
The reservoir was operated for flood control as required 
and necessary repairs were made to the structure and 
appurtenances. The project prevented an estimated 
$152,000 in flood damages during the fiscal year. To date, 
the project has prevented an estimated $17,673,000 in 
flood damages. 
10. DELAWARE LAKE, 
OHIO RIVER BASIN, OH 
Location. The damsite is located on the Olentangy 
River, approximately six miles above and north of 
Delaware, OH, and approximately 32 miles above the 
confluence of the Olentangy and Scioto Rivers at 
Columbus, OH. The reservoir is located in Delaware, 
Marion and Morrow Counties, OH. 
Existing project. The existing project consists of a 
rolled earth-fill dam with a gate controlled ogee type 
spillway and five outlet conduits in the channel. The dam 
is 18,600 feet in length and 92 feet in height. The project 
provides for storage of 132,800 acre-feet and controls a 
drainage area of approximately 381 square miles. 
Construction of the dam was initiated in April 1946 and 
completed in July 1948. For further details see the 1962 
Annual Report. See also Appendix A. Total real estate 
requirements of 7,703 acres of fee acquisition and 2,428 
acres of flowage easements have been completed. The 
Federal cost for the project was $7,631,821. 
Local cooperation. None required. 
Operations during the fiscal year. Operations 
and Maintenance. All construction work is complete. 
The reservoir was operated for the benefit of flood control 
as required, and necessary repairs were made to the 
structure and appurtenances. The project prevented an 
estimated $3,644,000 in flood damages during the fiscal 
year. To date, the project has prevented an estimated 
$58,437,000 in flood damages. 
11. DEWEY LAKE, 
OHIO RIVER BASIN, KY 
Location. The damsite is located on Johns Creek, 
approximately seven miles southeast of Paintsville, KY 
and approximately six miles above the confluence of 
Johns Creek and the Levisa Fork of the Big Sandy River. 
Existing project. The existing project consists of 
an earthfill dam 118 feet in height and 913 feet in length, 
a controlled outlet works discharging through a channel 
excavated in the left abutment, and a rolled earth-fill 
dike blocking a low divide to Brandykeg Creek and the 
Levisa Fork. The reservoir provides a total storage of 
93,300 acre-feet and controls a drainage area of 
approximately 207 square miles. Construction of the 
dam was initiated in March 1946 and completed in July 
1949. For further project detail see the 1965 Annual 
Report. See also Appendix A. Total real estate 
requirements for the project were 12,458 acres in fee and 
1,170 acres in flowage easements. The Federal cost of the 
project was $7,845,547, including expenditures for 
recreation under the completed project program. 
Local cooperation. None required. 
Operations during the fiscal year. Operations 
and Maintenance. All construction activities are 
complete. The reservoir was operated for the benefit of 
flood control as required and necessary repairs were 
made to the structure and appurtenances. The project 
prevented an estimated $148,000 in flood damages 
during the fiscal year. To date, the project has prevented 
an estimated $53,040,000 in flood damages. 
12. DILLON LAKE, 
OHIO RIVER BASIN, OH 
Location. The damsite is located on the Licking 
River, approximately six miles above the confluence of 
the Licking and Muskingum Rivers at Zanesville, Ohio. 
Existing project. The existing project consists of a 
rolled earth-fill dam 118 feet in height and 1,400 feet in 
length, a controlled outlet works discharging through a 
20-foot conduit in the right abutment, and an ungated 
280-foot spillway adjacent to the left abutment of the 
dam, and two rolled earthfill dikes. The reservoir 
provides for a total storage of 261,110 acre-feet and 
controls a drainage area of approximately 748 square 
miles. Construction of the dam was completed in July 
1959. For further project details see the 1962 Annual 
25-4

HUNTINGTON WEST VIRGINIA DISTRICT 
Report. See also Appendix A. Total real estate required 
for the project consists of 8,232 acre in fee and 5,380 acres 
of flowage easements. See also Appendix A. Federal cost 
ofthe project was $30,218,135. 
Local cooperation. None required. 
Operations during the fiscal year. Operations 
and Maintenance. All construction work is complete. 
The project was operated as required for flood control, 
and necessary repairs were made to the structure and 
appurtenances. The project prevented an estimated 
$3,325,000 in flood damages during the fiscal year. To 
date, the project has prevented an estimated 
$106,057,000 in flood damages. 
13. EAST LYNN LAKE, 
OHIO RIVER BASIN, WV 
Location. The damsite is located in Wayne County, 
WV approximately six miles southeast of Wayne, WV, 10 
miles above the mouth of East Fork and 42 miles above 
the confluence of Twelvepole Creek and the Ohio River. 
Existing project. The existing project consists of 
an earth-fill dam 113 feet in height and 638 feet in 
length, an uncontrolled spillway near the left abutment 
of the dam, and a 13-foot reinforced concrete tunnel in the 
right abutment with a control structure at the upstream 
end. The reservoir provides for a total storage of 82,500 
acre-feet and controls a drainage area of approximately 
133 square miles. The required 552 tracts of land have 
been acquired. See also Appendix A. The Federal costs of 
the project was $37,025,968. 
Local cooperation. None required. 
Operations during the fiscal year. Operations 
and Maintenance. All construction work is complete. 
The project was operated for flood control as required and 
necessary repairs were made to the structure and 
appurtenances. The project prevented flood damages 
estimated at $365,000 during the fiscal year. To date, the 
project has prevented an estimated $34,635,000 in flood 
damages. 
14. FISHTRAP LAKE, 
OHIO RIVER BASIN, KY 
Location. The damsite is located in Pike County, 
KY, on the Levisa Fork of the Big Sandy River, 
approximately 15 miles upstream from Pikeville, KY, 
approximately three miles above the confluence of 
Levisa and Russell Forks and 103 miles above the mouth 
of the Levisa Fork. 
Existing project. The existing project consists of a 
rock-fill dam 195 feet in height and 1,100 feet in length, 
a controlled spillway containing four tainter gates 
located in the valley wall adjacent to the left abutment 
of the dam, the outlet works consists of an intake 
structure with three conduits controlled by slide gates 
and discharging into a horseshoe shaped tunnel. The 
reservoir provides for a total storage of 164,360 acre-feet 
and controls a drainage area of approximately 395 
square miles. The dam was completed in February 1969. 
The 1,301 tracts of land required for the project have been 
acquired. See also Appendix A. The Federal costs for the 
project was $54,670,126, which includes expenditures 
under the recreation at completed projects program. 
Local cooperation. None required. 
Operations during the fiscal year. Operations 
and Maintenance. All construction work is complete. 
The project was operated for flood control as required, 
and necessary repairs wer made to the structure and 
appurtenances. During the fiscal year the project 
prevented flood damages estimated to be $1,973,000. To 
date, the project has prevented an estimated 
$265,482,000 in flood damages. 
15. GRAYSON LAKE, KY 
Location. The damsite is located in Carter County, 
Kentucky on the Little Sandy River approximately 49 
miles above the confluence with the Ohio River, and 11 
miles upstream from Grayson, KY. 
Existing project. The existing project consists of a 
random earthfill dam 120 feet in height and 1,460 feet in 
length, a controlled outlet works discharging through a 
14-foot spillway beyond the left abutment. The reservoir 
provides for a total storage of 119,000 acre-feet and 
controls a drainage area of approximately 196 square 
miles. The dam was completed in January 1968. The 484 
tracts of land required for the project have been acquired. 
See also Appendix A. Federal costs for the project was 
$19,162,741, which includes expenditures for recreation 
facilities under the completed projects program. 
Local cooperation. None required. 
Operations during the fiscal year. Operations 
and Maintenance. All construction work is complete. 
The reservoir was operated for flood control as required 
and necessary repairs were made to the structure and 
appurtenances. During the fiscal year the project 
prevented flood damages estimated to be $547,000. To 
date, the project has prevented an estimated $31,528,000 
in flood damages. 
25-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
16. JOHN W. FLANNAGAN 
DAM AND RESERVOIR, 
OHIO RIVER BASIN, VA 
Location. The damsite is located in Dickenson 
County, VA, approximately four miles northwest of 
Haysi, VA, on the Pound River approximately two miles 
above the confluence of the Pound River and Russell Fork 
and approximately 150 miles above the mouth of the Big 
Sandy River. 
Existing project. The existing project consists of a 
rock-fill dam 252 feet in height and 970 feet in length, an 
outlet tunnel located near the left abutment of the dam 
with a control structure at the upstream end, a spillway 
controlled by six tainter gates located in a saddle just 
upstream from the damsite. The reservoir provides for a 
total storage of 145,700 acre-feet and controls a drainage 
area of approximately 222 square miles. The project was 
modified to include water quality control by adding 
control gates to the previously uncontrolled spillway, 
which increased the total storage capacity by 39,000 
acre-feet. The dam was completed in December 1963. The 
382 tracts of land required for the project have been 
acquired. See also Appendix A. The Federal cost for the 
project was $20,444,383, which includes expenditures for 
recreation under the completed projects program. 
Local cooperation. None required. 
Operations during the fiscal year. Operations 
and Maintenance. All construction work is complete. 
The project was operated for flood control as required and 
necessary repairs were made to the structure and 
appurtenances. During the fiscal year the project 
prevented flood damages estimated to be $336,000. To 
date, the project has prevented an estimated 
$138,193,000 in flood damages. 
17. LEVISA AND TUG FORKS OF THE 
BIG SANDY AND CUMBERLAND 
RIVERS, WV, VA, AND KY 
Location. The Levisa and Tug Forks form the Big 
Sandy River at Louisa, KY. The Cumberland portion is 
the Upper Cumberland River Basin above Cumberland 
Falls, KY. The basin is approximately 100 miles in 
length and averages approximately 30 miles in width in 
the lower portion and approximately 10 miles in width 
above Harlan, KY. The Big Sandy Basin is within the 
Huntington District, and the Cumberland Basin is 
within the Nashville District. This report covers that 
portion of the project located in the Huntington District. 
Existing project. The authorization language 
directs the Corps of Engineers to design and construct, at 
full Federal expense, such flood control measures as are 
determined to be necesssary and advisable for the 
communities in the Tug and Levisa Forks and Upper 
Cumberland River basins. The authorization further 
states that such flood control measures would be located 
at or in the vicinity of Pikeville, KY; and Grundy, VA on 
the Levisa Fork; Pineville, KY, on the Cumberland 
River; and Williamson and Matewan on the Tug Fork, in 
order to afford the named communities and other flood 
damaged locations and their immediate environs a level 
of protection against flooding at least sufficient to 
prevent any future losses from the likelihood of flooding 
such as occurred in April 1977. The full funding estimate 
for the project is $464,200,000, which includes 
$19,200,000 non-Federal contributions. 
Local cooperation. None required. 
Operations during the fiscal year. Additional 
engineering studies are now underway to determine 
what is necessary and advisable to address the flooding 
problems in both the Levisa Fork Basin and in the Tug 
Fork tributary stream areas. The contract for 
construction of the Pump Station at West Williamson, 
WV was awarded in April 1983 and is complete. The 
contract for construction of the floodwall at West 
Williamson, WV, was awarded in July 1986 and is 13% 
complete. The contract for the Williamson Area Clearing 
was awarded in September 1987. The contract for the 
Williamson Housing Development, Valley View Site, 
was awarded in September 1987. The overall project is 
29% complete. 
18. MASSILLON, OH 
Location. The project is located in Stark County, on 
the Tuscarawas River, approximately 200 miles above 
the mouth of the Muskingum River. 
Existing project. The existing project consists of 
channel improvement to the Tuscarawas River, 
combined with the construction of drainage facilities, 
levees and pump stations. For further details see the 
1962 Annual Report. Construction was initiated in July 
1940 and completed in October 1951. 
Local cooperation. None required. See the 1962 
Annual Report for details of local contribution of work 
beyond the scope of the project. 
Operations during the fiscal year. Routine 
inspections were conducted to determine that the 
improved channel was maintained in satisfactory 
condition. 
19. MUSKINGUM RIVER LAKES, OH 
Location. The Muskingum River lies in Southeast 
Ohio and including tributaries, drains approximately 
25-6

HUNTINGTON WEST VIRGINIA DISTRICT 
8,000 square miles. The headwaters rise about 25 miles 
south of Lake Erie and flow into the Ohio River at 
Marietta, OH, 172 miles below Pittsburgh, PA. 
Existing project. The existing project consists of 
the construction and operations and maintenance of 14 
reservoirs and appurtenant works in the Muskingum 
River Basin. The existing project originally authorized 
by the Public Works Administration in February 1934. 
Construction of the system was initiated in January 1935 
and completed in November 1938. The system was 
initially operated and maintained by the Muskingum 
Watershed Conservancy District of Ohio, the sponsoring 
agency, from July 1938 to August 1939 when operation 
and maintenance became the responsibility of the Corps 
of Engineers in accordance with the provisions of the 
1939 Flood Control Act. For further project details, see 
the 1962 Annual Report. See also Appendix A. The cost 
of the project was $41,247,815, which includes 
expenditures for recreation facilities under the 
completed project program. A significant Major 
Rehabilitation program was approved in December 1977 
in order to assure the integrity of the existing 14 
structures under the originally designed maximum pool 
conditions. Underseepage and abutment seepage 
problems are being corrected through the installation of 
downstream blankets and/or relief wells and grouting. 
The estimated full funding cost of the rehabilitation 
program is $39,100,000 in total, with $25,500,000 from 
the Construction, General Appropriation and 
$13,600,000 from the Operations and Maintenance, 
General Appropriation. A related but separate program 
entitled Dam Safety Assurance has been initiated. 
Under current hydrologic design standards, deficiencies 
exist in the spillways at all the 14 projects in the system. 
Corrective measures include widening present 
spillways, constructing new spillways and installing 
parapet walls on top the dams. The full funding estimate 
for the Dam Safety Assurance Program is $60,870,000. 
Local cooperation. All requirements for local 
cooperation have been met. For further details see the 
1942 Annual Report. 
Operations during the fiscal year. New Work. 
The Major Rehabilitation is continuing as scheduled. 
Thus far, twenty contracts have been awarded and the 
program is 83% complete. The Dam Safety Assurance 
program was initiated during FY 1982. Thus far seven 
contracts have been awarded and the Dam Safety 
Assurance program is 27% complete. 
Operations and Maintenance. The reservoirs 
were operated for flood control as required, and the 
necessary repairs were made to the structures and 
appurtenances. The system prevented an estimated 
$44,358,000 in flood damages during the fiscal year. To 
date, the system has prevented an estimated 
$1,137,732,000 in flood damages. 
20. NEWARK, OHIO 
Location. The project is located in Licking County 
at the junction of the North and South Forks of the 
Licking River, approximately 29 miles above the 
confluence with the Muskingum River at Zanesville, OH. 
Existing project. For details of the existing project 
see the 1981 Annual Report. Construction of the existing 
project was initiated in July 1940 and completed in 
November 1941. As a result of the 1968 Flood Control Act 
the existing project was modified to include improvement 
of the interior drainage facilities, construction of Log 
Pond Run diversion channel and modification of the 
North Fork Channel. Construction of the Log Pond Run 
diversion channel was awarded in September 1980 and 
completed in December 1981. The full funding estimate 
for the project is $10,100,000 Federal cost and $4,215,000 
non-Federal. 
Local cooperation. For details of required and 
completed local cooperation see the 1981 Annual Report. 
Operations during the fiscal year. New Work: 
North Fork Channel - As a result of withdrawal of State 
support for the Utica Lake project (now inactive) and the 
interdependency of the operation of Utica with the North 
Fork Channel, the North Fork Channel portion of the 
project required re-formulation. A reanalysis is 
complete. Engineering studies continued. The contract 
for construction of North Fork Channel (Phase I) was 
awarded in September 1986. 
Operations and Maintenance: Routine inspections 
were conducted to determine that the improved channel 
was maintained in satisfactory condition. 
21. NORTH BRANCH OF KOKOSING 
RIVER LAKE, OH 
Location. The damsite is located in Knox County, 
OH, on the North Branch of Kokosing River, 
approximately nine miles above the confluence of the 
Kokosing and North Branch Rivers, and two miles 
northwest of Fredericktown, OH. 
Existing project. The existing project consists of a 
rolled-earth dam, 70 feet in height and 1,400 feet in 
length with an uncontrolled spillway adjacent to the 
right abutment, and an uncontrolled, reinforced concrete 
outlet work located in the right abutment of the dam. The 
reservoir provides for a total storage of 14,885 acre-feet 
and controls a drainage'area of approximately 45 square 
miles. the 56 tracts of land required for the project have 
been acquired. Construction of the dam was completed in 
May 1972. See also Appendix A. The Federal cost for the 
project was $6,665,985, which includes expenditures 
under the recreation at completed projects program. 
25-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Local cooperation. None required. 
Operations during the fiscal year. Operations 
and Maintenance. All construction work is complete. 
Necessary repairs were made to the structure and 
appurtenances. 
22. NORTH FORK OF POUND 
RIVER LAKE, VA 
Location. The damsite is located in Wise County, 
VA, on the North Fork of Pound River, approximately 
one mile upstream from the confluence of the North and 
South Forks which form the Pound River and 
approximately three miles upstream from Pound, VA. 
Existing project. The existing project consists of a 
rockfill dam, 130 feet in height and 600 feet in length, an 
uncontrolled spillway in a saddle upstream from the 
dam, and an outlet tunnel in the right abutment with a 
control structure at the upstream end. The reservoir 
provides a total storage of 11,300 acre-feet and controls 
a drainage area of approximately 17 square miles. The 
127 tracts of land required for the project have been 
acquired. Construction of the dam was completed in 
January 1966. See also Appendix A. The Federal costs for 
the project was $6,186,901, which includes expenditures 
for recreation under the completed projects program. 
Local cooperation. None required. 
Operations during the fiscal year. Operations 
and Maintenance. All construction is complete. The 
project was operated as required for flood control and the 
necessary repairs were made to the structure and 
appurtenances. During the fiscal year the project 
prevented flood damages estimated to be $18,000. To 
date, the project has prevented an estimated $4,680,000 
in flood damages. 
23. OHIO RIVER BASIN 
(HUNTINGTON DISTRICT) 
Location. The work covered by this project consists 
of a series of levees, floodwalls, channel improvements 
and dams and lakes in the Ohio River Basin within the 
Huntington District. 
Existing project. The existing project consists of the 
individual projects considered in the Ohio River Basin 
comprehensive plan within the Huntington District. 
Operations during the fiscal year. The 
completed local protection porjects, which are operated 
and maintained by local interest, except for those local 
protection projects for which individual reports have 
been included, prevented flood damages of an estimated 
aggregate total of $10,508,000. 
24. PAINT CREEK LAKE, 
OHIO RIVER BASIN, OH 
Location. The damsite is located in Ross County, 
Ohio, on Paint Creek, a tributary of the Scioto River, 
approximately 37 miles above the mouth of Paint Creek 
and 100 miles above the mouth of the Scioto River and 
approximately four miles east of New Parkersburg, OH. 
Existing project. The existing project consists of a 
rock and random earth fill dam, 118 feet in height and 
700 feet in length, a gale controlled spillway located near 
the right abutment, an outlet tunnel located in the right 
abutment with a control structure at the upstream end, 
and a random rockfill dike located at the right abutment 
of the spillway. The reservoir provides for a total storage 
of 145,000 arcre-feet and controls a drainage area of 
approximately 576 square miles. Construction of the 
dam was completed in July 1973. The 257 tracts of land 
required for the project have been acquired. See also 
Appendix A. Federal costs for the project was 
$26,969,962, which includes expenditures under the 
recreation at completed projects program. 
Local cooperation. For details of required local 
cooperation see the 1981 Annual Report. 
Operations during the fiscal year. Operations 
and Maintenance. All construction work is complete. 
The reservoir was operated for flood control as required 
and the necessary repairs were made to the structure and 
appurtenances. During the fiscal year the project 
prevented an estimated $146,000 in flood damages. To 
date, the project has prevented flood damages estimated 
to be $38,046,000. 
25. PAINTSVILLE LAKE, KY 
Location. The damsite is located in Johnson 
County, KY, on Paint Creek, a tributary of the Levisa 
Fork of the Big Sandy River, approximately eight miles 
above the mouth of Paint Creek, and four miles west of 
Paintsville, KY. 
Existing project. The existing project consists of a 
rockfill dam 153 feet in height and 1,560 feet in length, 
an uncontrolled spillway located southwest of the right 
abutment of the dam, and an outlet tunnel in the right 
abutment with a control structure at the upstream end. 
The reservoir provides for a total storage of 76,642 acrefeet 
and controls a drainage area of approximately 93 
square miles. The 635 tracts of land required for the 
project have been acquired. Construction of the dam was 
initiated in September 1976 and was completed in 
September 1980. See also Appendix A. The full funding 
estimate for new work is $63,784,000, which includes 
$2,990,000 non-Federal Costs. The local sponsor has 
reimbursed the Government $298,222 for the cost 
sharing portion of recreation development. 
25-8

HUNTINGTON WEST VIRGINIA DISTRICT 
Operations during the fiscal year. New Work: 
Construction of the project is well advanced. The 
remaining work items include minor highway 
relocations, landscaping and final cleanup. 
Operations and Maintenance: The reservoir was 
operated for flood control as required and necessary 
repairs were made to the structure and appurtenances. 
During the fiscal year the project prevented flood 
damages estimated to be $4,000. To date, the project has 
prevented flood damages estimated to be $5,647,000. 
26. R. D. BAILEY LAKE, WV 
Existing project. The damsite is located in 
Wyoming County, WV, on the Guyandotte River 
approximately 108 miles above the confluence with the 
Ohio River and one mile east of Justice, WV. 
Existing project. The existing project consists of a 
rolled rockfill dam with a concrete face, 305 feet in height 
and 1,330 feet in length, an uncontrolled spillway located 
in a saddle in the right abutment of the dam, and an 
outlet tunnel in the left abutment with a control 
structure located at the upstream end. The reservoir 
provides for a total storage of 203,700 acre-feet and 
controls a drainage area of approximately 540 square 
miles. Construction of the dam was initiated in 
November 1973 and completed in December 1979. See 
also Appendix A. The estimate for new work is 
$264,100,000. 
Local cooperation. None required. 
Condition at the end of the fiscal year. New 
Work: Construction of the project is well advanced. The 
remaining work items include remaining recreation, 
landscaping and cleanup. 
Operations and Maintenance. The reservoir was 
operated for flood control as required and necessary 
repairs were made to the structure and appurtenances. 
During the fiscal year the project prevented flood 
damages estimated to be $1,404,000. To date, the project 
has prevented flood damages estimated to be 
$58,696,000. 
27. ROSEVILLE, OH 
Location. The project is located in Muskingum and 
Perry Counties, on Moxahala Creek, approximately six 
miles the confluence with Jonathan Creek, a tributary of 
the Muskingum River. 
Existing project. The existing project consists of 
7,291 feet of channel improvement; 6,400 feet of levee 
and railroad embankment enlargements; and the 
necessary appurtenances for interior drainage. Total 
Federal cost of the project was $910,785. Construction 
was initiated in August 1959 and completed in October 
1960.
Local cooperation. All requirements for local 
cooperation have been completed. See also the 1962 
Annual Report. Total costs of local requirements were 
$62,000. 
Operations during the fiscal year. Routine 
inspections of the improved portion of the project were 
conducted to determine that the project was maintained 
in satisfactory condition. 
28. SUMMERSVILLE LAKE, 
OHIO RIVER BASIN, WV 
Location. The damsite is located at Ruckers Bend 
in Nicholas County on the Gauley River approximately 
35 miles above the confluence of the Gauley and New 
River at Gauley Bridge, WV. 
Existing project. The existing project consists of a 
rockfill dam having a height of 357 feet and a length of 
2,280 feet, an outlet tunnel in the right abutment with 
a control structure located at the upstream end, an 
uncontrolled spillway located west of the right abutment 
and two earthfill dikes. The reservoir provides for a total 
storage of 413,800 acre-feet and controls a drainage area 
of 803 square miles. See also Appendix A. Construction 
of the dam was initiated in March 1960 and completed in 
March 1966. A total of 9,346 acres of land were acquired 
for the project. The Federal costs of the project was 
$48,375,884, which includes expenditures under the 
recreation at completed projects program. 
Local cooperation. None required. 
Operations during the fiscal year. All 
construction work is complete. The project was operated 
for flood control as required and necesssary repairs were 
made to the structures and appurtenances. The project 
prevented an estimated $9,372,000 in flood damages 
during the fiscal year. To date, the project has prevented 
an estimated $255,881,000 in flood damages. 
29. SUTTON LAKE, 
OHIO RIVER BASIN, WV 
Location. The damsite is located on the Elk River 
in Braxton County approximately one mile above Sutton, 
WV and 101 miles above the mouth of the Elk River. 
Existing project. The existing project consists of a 
concrete gravity dam having a height of 220 feet and a 
length of 1,178 feet, a gated spillway in the channel 
25-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
section of the dam, comprised of six tainter gates 
supported by piers, an outlet works comprised of five gate 
sluices through the spillway section. The reservoir 
provides for a storage of 265,300 acre-feet and controls a 
drainage area of 537 square miles. See also Appendix A. 
Construction of the dam was initiated in September 1956 
and completed in June 1960. A total of 13,154 acres of 
land were acquired for the project. The Federal costs of 
the project was $37,029,585, which includes 
expenditures under the recreation at completed projects 
program. 
Local cooperation. None required. See the 1981 
Annual Report for contributed funds. 
Operations during the fiscal year. All 
construction work is complete. The project was operated 
for flood control as required and necessary repairs were 
made to the structure and appurtenances. The project 
prevented an estimated $1,341,000 in flood damages 
during the fiscal year. To date, the project has prevented 
an estimated $173,123,000 in flood damages. 
30. TOM JENKINS RESERVOIR, 
OHIO RIVER BASIN, OH 
Location. The damsite is located in Athens County, 
on the East Branch of Sunday Creek, a tributary of the 
Hocking River, approximately three miles north of 
Glouster, Ohio and 57 miles above the mouth of the 
Hocking River. 
Existing project. The existing project consists of a 
rolled-earth dam, 84 feet in height and 944 feet in length, 
a controlled works discharging through a tunnel in the 
left abutment, and an uncontrolled spillway in the ridge 
running south from the damsite. The reservoir, known as 
Burr Oak Lake, provides for a total storage of 26,900 
acre-feet and controls a drainage area of approximately 
33 square miles. See also Appendix A. Construction of 
the project was initiated in March 1948 and completed in 
February 1950. A total of 100 acres of land were acquired 
for the project. The Federal costs of the project were 
$2,086,503, which includes expenditure for recreation at 
completed project. 
Local cooperation. All requirements of local 
cooperation have been met, see also the 1962 Annual 
Report. Contributed funds in the amount of $575,000 
have been received from the State of Ohio. 
Operations during the fiscal year. All 
construction work is complete. The project was operated 
for flood control as required and necessary repairs were 
made to the structure and appurtenances. During the 
fiscal year the project prevented flood damages estimated 
to be $190,000. To date, the project has prevented an 
estimated $9,597,000 in flood damages. 
31. YATESVILLE LAKE, KY 
Location. The damsite is located in Lawrence 
County, on Blaine Creek, a tributary of the Big Sandy 
River, approximately five miles west of Louisa, KY and 
18 miles above the mouth of Blaine Creek. 
Existing project. The existing project provides for 
the construction of an earthfill dam, 104 feet in height 
and 770 feet in length, an uncontrolled spillway located 
approximately one-half mile east of the right abutment 
of the dam, and an outlet tunnel through the left 
abutment of the dam with a control structure at the 
upstream end. The reservoir will provide a total storage 
of 86,951 acre-feet and control a drainage area of 208 
square miles. The full funding estimate for new work is 
$104,000,000, which will be allocated and expended by 
the Federal Government. The sponsor will reimburse the 
Government an estimated $6,615,000 for the cost 
sharing portion of the recreation development. To date, 
408 of the required 758 real estate tracts have been 
acquired. A contract for construction of the dam was 
awarded in January 1977 and was terminated for the 
convenience of the Government in August 1977. 
Operations during the fiscal year. New Work: 
Congress appropriated funds in fiscal year 1981 to 
resume project construction and work progressed until 
March 1981 when administration directed a deferral 
action which resulted in a substantial reduction in 
project funds and the elimination of any recommendation 
for funding in fiscal years 1982 and 1983. Congressional 
action provided fiscal year 1982 through 1987 funding for 
the project. The contract for Construction of Dam and 
Appurtenant Works, Phase I, was awarded in March 
1984 and is complete. Contracts with the Commonwealth 
and the County for relocation and/or abandonment of 
roads affected by the project are complete. The contract 
for construction of Dam and Appurtenances (Phase II) 
was awarded in April 1986 and is 87% complete. The 
contract for Relocation of SR32-2 was awarded in 
February 1986 and is complete. 
32. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
The flood control act of June 22, 1936 and 
subsequent acts require local interest to furnish 
assurances that they will operate and maintain certain 
local protection projects after completion in accordance 
with regulations prescribed by the Secretary of the 
Army. District Engineers are responsible for the 
administration of these regulations within their 
respective districts. Maintenance inspections were made 
during the fiscal year of those completed units 
transferred to local interests for operation and 
maintenance. Local interests were advised, as necessary, 
of measures required to maintain the projects in 
25-10

HUNTINGTON WEST VIRGINIA DISTRICT 
accordance with the standards prescribed by regulations. 
Total costs for fiscal year 1987 were $84,726. Total cost 
to September 30,1986 were $1,361,065. The flood control 
works inspected and the dates of inspection are tabulated 
in Table H. 
33. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency bank protection activities pursuant to 
Section 14 of the 1946 Flood Control Act, Public Law 526, 
79th Congress are tabulated as follows: 
Location FY 1987 Cost 
Apple Creek, Apple Creek, OH 
Dunbar (Sewage Facilities), WV 
Jardin Manor, Lick Creek, OH 
Kenova, WV 
Little Kanawha River, Glenville, WV 
Little Stillwater Creek, Urichsville, OH 
Ohio River, Gallipolis, OH 
Ohio River, Williamstown, WV 
Prices Creek at Smithfield, WV 
Sistersville, WV, Storm and Sanitary Sewers 
State Route 62, Buffalo, WV 
$3,865 
134,293 
10,295 
14,462 
11,710 
600 
69,113 
2,460 
5,381 
13,837 
10,276 
Flood control activities pursuant to Section 205 of 
the 1948 Flood Control Act, Public Law 853, 80th 
Congress are tabulated as follows: 
Location 
Black Fork, Richland County, OH 
Blacklick Creek, Franklin County, OH 
Hughes Creek, Hugheston, WV 
Landis Ditch, Rittman, OH 
Marsh Fork, Fairdale, WV 
Muskingum River, Mansfield, OH 
Olentangy River, Galion, OH 
Shope Creek, Ashland, KY 
Spring Creek, Spencer, WV 
Upper Scioto River, Marion County, OH 
FY 1987 Cost 
$3,194 
245,904 
33,565 
51,004 
61,238 
990 
1,801 
10 
21 
171,711 
Snagging and clearing activities pursuant to 
Section 208 of the 1954 Flood Control Act, Public Law 
780, 83rd Congress are tabulated as follows: 
Location FY 1987 Cost 
Krouts Creek, Huntington, WV 
Shope Creek, Ashland, KY 
Whetstone, Mt. Gilead, OH 
$1,518 
2,307 
1,828 
Flood control and coastal emergency activities 
pursuant to Public Law 99, 84th Congress were 
conducted as required during FY 1987 at a cost of 
$256,041. 
National emergency management activities were 
accomplished by the district as required. The costs for 
these activities during FY 1987 were $173,069. 
34. SURVEYS 
Fiscal year 1987 costs were $2,671,098 itemized as 
follows: 
Navigation Studies 
Flood Damage Prevention Studies 
Comprehensive Basin Studies 
Review for Deauthorization 
Miscellaneous Activities 
Coordination Studies 
Continuation of Planning and Engineering 
Advance Engineering and Design 
35. COLLECTION AND STUDY 
OF BASIC DATA 
Fiscal year costs were $173,994. 
$787,562 
907,728 
430,409 
96 
98,501 
127,238 
23,406 
296,158 
25-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 25-A COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
In Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
2. Kanawha River, 
WV 
(Existing Project) 
Winfield L&D 
New Work 
Approp. 22,000 - - 
Cost 155,886 - - 
Maint. 
Approp. 5,631,000 6,271,000 6,765,000 
Cost 5,522,048 7,008,174 6,780,172 
Rehab. 
Approp. - - - 
Cost - - - 
New Work 
Approp. 
Cost 
5. Alum Creek Lake, New Work 
OH Approp. 
Cost 
Maint. 
Approp. 
Cost 
- -20,300 
719,142 146,538 
450,000 691,000 
438,273 698,086 
6. Beech Fork Lake, New Work 
WV Approp. 1,950,000 1,200,000 
Cost 1,839,500 1,382,433 
Maint. 
Approp. 490,000 554,000 
Cost 484,504 545,316 
- 27,853,6991 
- 27,853,6991 
5,326,600 78,383,1842 
5,273,037 78,294,4852 
- 130,394 s 
- 130,394* 
- 1,185,000 
- 788,585 
-45,933 
5,341 
600,200 
608,490 
186,000 
281,817 
608,000 
620,375 
578,800 
584,656 
77,021 
807,500 
800,170 
1,185,000 
788,585 
56,267,422 
56,267,422 
5,018,065 
4,998,992 
42,027,500 
41,952,603 
5,339,539 
5,324,929 
7. Bluestone Lake, 
Ohio River Basin, 
WV 
New Work 
Approp. - - 
Cost 1,049 - 
Maint. 
Approp. 1,033,000 1,055,000 
Cost 953,694 1,181,993 
- - 29,458,652' 
- - 29,458,652' 
730,200 831,300 12,541,578 
725,974 818,116 12,505,107 
8. Burnsville Lake, New Work 
Ohio River Basin, Approp. 
WV Cost 
Maint. 
Approp. 
Cost 
9. Deer Creek Lake, New Work 
Ohio River Basin, Approp. 
OH Cost 
Maint. 
Approp. 
Cost 
10. Delaware Lake, 
Ohio River Basin, 
OH 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
650,000 -110,000 
1,399,214 413,697 
745,000 989,000 
726,644 1,014,583 
-39,426 
12,722 
1,079,600 
1,063,503 
1,036,000 
1,051,479 
470,000 447,960 431,200 466,200 
489,691 446,813 454,619 454,016 
975,000 334,000 1,244,500 831,500 
1,150,611 481,846 1,255,843 804,290 
25-12 
56,195,839 
56,195,839 
6,911,1056 
6,890,0526 
20,406,5456 
20,406,5456 
6,152,725' 
6,133,887' 
7,631,821 
7,631,821 
8,112,7198 
8,073,2548

HUNTINGTON WEST VIRGINIA DISTRICT 
TABLE 25-A (cont'd) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
In Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30,1987 
11. Dewey Lake, 
Ohio River Basin, 
KY 
12. Dillon Lake, 
Ohio River Basin, 
OH 
13. East Lynn Lake, 
Ohio River Basin, 
WV 
14. Fishtrap Lake, 
Ohio River Basin, 
KY 
15. Grayson Lake, 
KY 
16. John W. Flannagan 
Dam & Reservoir, 
Ohio River Basin, 
VA 
17. Levisa & Tug Forks 
of the Big Sandy & 
Cumberland Rivers, 
KY, WV, & VA 
18. Massillon, OH 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
920,000 1,235,000 
848,817 1,281,093 
380,000 597,000 
376,678 631,304 
83,884 
837,000 
811,006 
-1,967 
7,805 
1,175,000 
1,140,831 
935,400 1,102,600 
935,266 1,087,460 
823,300 
809,990 
27 - 
973,000 1,169,000 
984,952 1,201,498 
869,000 757,500 
992,134 777,145 
720,000 694,000 
606,442 785,280 
-14,215 
759 
681,000 
677,713 
674,000 
732,210 
1,600,000 5,140,000 
4,744,091 8,063,946 
12,000 
12,013 
18,000 
17,999 
572,000 
598,334 
666,500 
674,436 
14,526,000 30,865,000 
15,005,640 20,547,722 
13,300 
12,942 
25-13 
410,900 
405,026 
7,845,5479 
7,845,5479 
12,573,97610 
12,528,28410 
30,218,135 
30,218,135 
5,339,04311 
5,313,14411 
37,025,968 
37,025,968 
10,298,20712 
10,257,51412 
54,670,12613 
54,670,12618 
6,893,6981' 
6,872,03814 
19,162,74115 
19,162,74115 
8,545,070 
8,527,043 
20,444,38316 
20,444,383' 
6 
10,037,6621' 
10,017,67517 
68,731,000 
57,496,277 
8,139,40618 
8,139,40618 
293,708 
293,449 
960,300 
945,656 
806,000 
803,962 
639,000 
631,346 
857,300 
844,377 
-100

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 25-A (cont'd) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
In Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
19. Muskingum River 
Dams & Lakes, 
OH 
20. Newark, OH 
(Previous Project) 
(Existing Project) 
21. North Branch of 
Kokosing River 
Lake, OH 
22. North Fork of 
Pound River Lake, 
Ohio River Basin, 
VA 
23. Ohio River Basin 
24. Paint Creek Lake, 
Ohio River Basin, 
OH 
25. Paintsville Lake, 
KY 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
(Rehab.) 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
Dam Safety 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
- - - - 41,247,81519 
- - - - 41,247,81519 
4,380,000 4,118,000 4,041,000 4,110,000 61,085,07020 
4,067,444 4,347,427 4,154,795 3,980,201 60,896,87820 
1,550,000 
1,344,317 
1,600,000 
1,673,128 
26,000 
26,002 
300,000 
350,514 
94,000 
103,989 
313,000 
296,015 
1,636,000 
2,248,347 
900,000 
1,312,092 
17,377 
17,377 
134,000 
251,472 
103,000 
109,710 
993,000 
1,139,211 
60,000 
308,507 
13,800 
13,737 
297,785 
198,296 
58,600 
59,642 
255,000 199,000 
268,505 206,538 
196,800 
195,560 
2,052,000 
1,915,129 
6,000,000 
4,473,692 
23,200 
23,004 
265,000 
356,352 
158,300 
151,627 
297,400 
284,700 
196,800 
195,560 
21,587,94521 
21,353,44821 
12,940,000 
11,301,466 
845,916 
845,916 
739,142 
738,883 
6,037,512 
6,027,630 
6,665,98522 
6,665,98522 
1,501,917 
1,492,560 
6,186,901" 
6,186,901 
5,137,7592 
5,123,069 
355,861 
355,861 
425,000 
475,195 
3,790,000 
3,273,809 
505,000 
486,911 
415,000 464,000 
435,438 455,093 
1,721,000 
1,693,268 
573,000 
579,651 
84,359 
435,106 
844,500 
816,543 
- 26,969,962" 
- 26,969,962" 
706,700 5,353,6567 
669,305 5,293,6827 
620,000 
856,936 
685,600 
672,878 
58,487,147 
58,412,408 
3,445,600 
3,426,019 
25,14

TABLE 25-A (cont'd) 
HUNTINGTON WEST VIRGINIA DISTRICT 
COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
In Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept.30,1987 
26. R. D. Bailey Lake, New Work 
WV Approp. 15,600,000 9,250,000 - 45,250,000 261,222,23328 
Cost 14,817,521 10,295,735 271,600 45,222,538 261,180,61028 
Maint. 
Approp. 1,575,000 1,034,000 2,551,000 1,335,800 9,427,61429 
Cost 1,541,382 1,042,399 2,571,582 1,313,257 9,381,15029 
27. Roseville, OH New Work 
Approp. - - - - 910,785 
Cost - - - - 910,785 
Maint. 
Approp. 7,000 10,000 20,000 12,000 160,968 
Cost 7,003 9,998 19,961 12,004 160,931 
28. Summersville Lake, New Work 
Ohio River Basin, Approp. 7,183 -10,000 - - 48,375,88430 
WV Cost 7,598 17,895 - - 48,375,88430 
Maint. 
Approp. 1,119,000 982,000 1,649,000 2,784,500 16,839,41431 
Cost 1,087,885 1,046,276 1,656,311 2,794,884 16,810,66731 
29. Sutton Lake, New Work 
Ohio River Basin, Approp. 185,000 10,000 -5,376 - 37,029,58532 
WV Cost 29,016 147,803 12,805 - 37,029,58532 
Maint. 
Approp. 1,228,000 1,526,000 1,480,000 1,024,800 18,894,28733 
Cost 1,360,473 1,496,687 1,567,279 1,023,670 18,848,22433 
30. Tom Jenkins Dam, New Work 
OH Approp. - - - - 2,086,50334 
Cost - - .- - 2,086,50334 
Maint. 
Approp. 225,000 268,000 371,000 234,400 3,871,875 
Cost 228,745 258,014 378,150 240,242 3,866,368 
31. Yatesville Lake, New Work 
KY Approp. 10,000,000 15,000,000 9,642,000 5,410,000 60,096,500 
Cost 3,508,186 5,921,767 10,201,760 15,907,584 49,206,380 
See page 25-16 for footnotes. 
25-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
1lncludes $4,294,612 for new work for previous 
projects, $4,498,636 Emergency Relief funds, $9,004,800 
Public Works funds and $686,317 Code 713 funds. 
2Includes $3,883,513 for maintenance of previous 
projects and $546,090 Maintenance and Operation funds. 
3Public Works Acceleration funds. 
4Includes $543,960 Emergency Relief funds, $9,698 
Public Works Acceleration funds, $211,850 Code 711 
funds and $75,000 Code 713 funds. 
5Includes $66,678 Maintenance and Operations 
Funds. 
4Excludes $225,090 contributed funds. Includes 
$590,000 Code 711 funds. 
'Includes $130,000 provided by the Productive 
Employment Act of 1983. 
8Includes $240,000 provided by the Productive 
Employment Act of 1983. 
"Includes $23,087 Public Works Acceleration funds, 
$1,089,94 Code 711 funds and $231,105 Code 713 funds. 
1oIncludes $82,900 Special Recreation Use Fee Funds 
and $66,678 Maintenance and Operations Funds. 
1Ilncludes $100,000 provided from the Productive 
Employment Act of 1983. 
12 lncludes $209,918 Special Recreation Use Fee 
Funds and $66,678 Maintenance and Operations Funds. 
lI3 lncludes $362,649 Code 711 funds and $10,000 Code 
712 funds. 
14Includes $38,000 Special Recreation Use Fee Funds 
and $66,678 Maintenance and Operations Funds. 
15 lncludes $406,919 Code 711 funds and $2,317 Code 
713 funds. 
"elncludes $422,983 Code 711 funds. 
lI7lncludes $88,710 special recreation use fees. 
'slncludes $477,813 contributed funds. 
lncludes $27,190,000 National Industrial Recovery 
funds and $528,288 Code 711 funds. 
0"Includes $198,578 Maintenance and Operations 
funds. 
21lncludes $61,945 Public Works Acceleration funds. 
"Includes $45,177 Code 711 funds. 
nIncludes $64,233 Code 711 funds. 
4Includes $68,200 special recreation use fees. 
"'Includes $10,920 Emergency Relief funds. 
"Includes $14,153 Code 711 funds. 
~Includes $31,496 special recreation use fee funds. 
"Includes $5,534 Consolidated Army funds. 
"Includes $60,000 provided from the Productive 
Employment Act of 1983, and $66,678 Maintenance and 
Operations Funds. 
"Includes $300,062 Code 711 funds. 
slncludes $214,112 special recreation use fee funds, 
$300,000 provided from the Productive Employment 
Appropriations Act of 1983, and $66,678 Maintenance and 
Operation Funds. 
Includes $1,837,337 Code 711 funds and $287,843 
Accelerated Public Works funds. Excludes $62,800 
contributed funds. 
~Includes $267,634 special recreation use fee funds, 
$215,000 provided from the Productive Employment 
Appropriations Act of 1983, and $142,078 Maintenance 
and Operations Funds. 
4 lncludes $8,064 Code 711 funds and $30,000 Public 
Works Acceleration funds. Excludes $575,000 
contributed funds. 
25-16

TABLE 25-B 
HUNTINGTON WEST VIRGINIA DISTRICT 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
In Text Act Project and Work Authorized Documents 
2. Aug. 30,1935 
Aug. 15,1985 
Oct. 23,1962 
Oct. 23,1962 
Jun. 28, 1938 
Dec. 22,1944 
Jun. 28, 1938 
Dec. 22, 1944 
Jun. 28,1938 
Jun. 28,1938 
Dec. 22,1944 
Jun. 28,1938 
Dec. 22,1944 
Jun. 28, 1938 
Dec. 22, 1944 
25-17 
KANAWHA RIVER LOCKS AND DAMS, WV 
Construction of three locks and dams on the Kanawha 
River and one on the Ohio River. 
Engineering and Design and Land Acquisition for 
Winfield Locks and Dam. 
ALUM CREEK LAKE, OH 
Construction of Flood Control Reservoir. 
BEECH FORK LAKE, WV 
Construction of Flood Control Reservoir. 
BLUESTONE LAKE, OHIO RIVER BASIN, WV 
Construction of Flood Control Reservoir. 
Added Recreation 
Deleted Power 
BURNSVILLE LAKE, OHIO RIVER BASIN, WV 
Construction of Flood Control Reservoir. 
Added Recreation 
DEER CREEK LAKE, OHIO RIVER BASIN, OH 
Construction of Flood Control Reservoir. 
DELAWARE LAKE, OHIO RIVER BASIN, OH 
Construction of Flood Control Reservoir. 
Added Recreation 
DEWEY LAKE, OHIO RIVER BASIN, OH 
Construction of Flood Control Reservoir. 
Added Recreation 
DILLON LAKE, OHIO RIVER BASIN, OH 
Construction of Flood Control Reservoir. 
Added Recreation 
5. 
H. Doc. 31, 73rd Cong., 
1st Sess. 
P.L. 88, 99th Cong., 
1st Sess. 
H. Doc. 587, 87th Cong., 
2nd Sess. 
H. Doc. 520, 87th Cong., 
2nd Sess. 
H. Doc. 91, 74th Cong., 
2nd Sess. 
P.L. 534, 78th Cong., 
2nd Sess. 
Flood Control Comm. 
Doc. 1, 75th Cong., 
1st Sess. 
P.L. 534 78th Cong., 
2nd. Sess. 
Flood Control Comm. 
Doc. 1, 75th Cong., 
1st Sess. 
Flood Control Comm. 
Doc. 1, 75th Cong., 
1st Sess. 
P.L. 534, 78th Cong., 
2nd Sess. 
Flood Control Comm. 
Doc. 1, 75th Cong. 
1st Sess. 
P.L. 534, 78th Cong., 
2nd Sess 
Flood Control Comm. 
Doc. 1, 75th Cong., 
1st Sess. 
P.L. 534, 78th Cong., 
2nd Sess. 
9. 
10. 
11. 
12.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 25-B (cont'd) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
In Text Act Project and Work Authorized Documents 
13. Jun. 28,1938 
Dec. 22,1944 
14. Jun. 28,1938 
Dec. 22,1944 
EAST LYNN LAKE, OHIO RIVER BASIN, WV 
Construction of Flood Control Reservoir. 
Added Recreation 
FISHTRAP LAKE, OHIO RIVER BASIN, KY 
Construction of Flood Control Reservoir. 
Added Recreation 
Flood Control Comm. 
Doc. 1, 75th Cong., 
1st Sess. 
P.L. 534, 78th Cong., 
2nd Sess. 
Flood Control Comm. 
Doc. 1, 75th Cong., 
1st Sess. 
P.L. 534, 78th Cong., 
2nd Sess. 
H. Doc. 440, 86th Cong., 
2nd Sess. 
Flood Control Comm. 
Doc. 1, 75th Cong., 
1st Sess. 
P.L. 534, 78th Cong., 
2nd Sess. 
Sect. 202, P.L. 367, 
96th Cong., 2nd Sess. 
Flood Control Comm. 
Doc. 1, 75th Cong., 
1st Sess. 
Public Works Admin. 
Flood Control Comm. 
Doc. 1, 75th Cong., 
1st Sess. 
P.L. 396, 76th Cong., 
1st Sess. 
Flood Control Comm. 
Doc. 1, 75th Cong., 
1st Sess. 
H. Doc. 337, 90th Cong., 
2nd Sess. 
H. Doc. 220, 87th Cong., 
2nd Sess. 
H. Doc. 645, 86th Cong., 
2nd Sess. 
16. Jun. 28, 1938 
Dec. 22,1944 
17. Oct.1,1980 
18. Jun. 28,1938 
19. Feb. 20,1934 
Jun. 28,1938 
Aug. 11, 1939 
20. Jun. 28,1938 
Aug. 13,1968 
21. Oct. 23,1962 
22. Jul. 14, 1960 
JOHN W. FLANNAGAN DAM AND RESERVOIR, 
OHIO RIVER BASIN, VA 
Construction of Flood Control Reservoir. 
Added Recreation 
LEVISA AND TUG FORKS OF THE BIG SANDY 
RIVER, AND CUMBERLAND RIVER, KY, WV 
Construction of such Flood Control Measures as deemed 
Necessary and Advisable. 
MASSILLON, OHIO 
Construction of Channel Improvement Project. 
MUSKINGUM RIVER LAKES, OH 
Construction of 14 Flood Control Reservoirs. 
Reimbursement to the Muskingum Conservancy District a 
sum not to exceed actual expenditures for project construction. 
Operations and Maintenance assigned to the Corps of Engineers. 
NEWARK, OHIO 
Construction of Channel Improvement Project. 
Modification to Existing Project and Additional Channel 
Improvement and Drainage Facilities. 
NORTH BRANCH OF KOKOSING RIVER LAKE, OH 
Construction of Flood Control Reservoir. 
NORTH FORK OF POUND RIVER LAKE, VA 
Construction of Flood Control Reservoir. 
25-18 
GRAYSON LAKE, KY 
15. Jul. 14, 1960 Construction of Flood Control Reservoir.

TABLE 25-B (cont'd) 
HUNTINGTON WEST VIRGINIA DISTRICT 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
24. Jun. 28, 1938 
Dec. 22, 1944 
25. Oct. 27,1965 
26. Oct. 23, 1962 
27. Jun. 28, 1938 
28. Jun. 28, 1938 
Dec. 22, 1944 
29. Jun. 28, 1938 
Dec. 22,1944 
30. Dec. 22, 1944 
31. Oct. 27,1965 
32. Jun. 22, 1936 
PAINT CREEK LAKE, OHIO RIVER BASIN, OH 
Construction of Flood Control Reservoir. 
Added Recreation 
PAINTSVILLE LAKE, KY 
Construction of Flood Control Reservoir. 
R. D. BAILEY LAKE, WV 
Construction of Flood Control Reservoir. 
ROSEVILLE, OH 
Construction of Channel Improvement Project. 
SUMMERSVILLE LAKE, OHIO RIVER BASIN, WV 
Construction of Flood Control Reservoir. 
Added Recreation 
SUTTON LAKE, OHIO RIVER BASIN, WV 
Construction of Flood Control Reservoir. 
Added Recreation 
TOM JENKINS DAM, OHIO RIVER BASIN, OH 
Construction of Flood Control Reservoir. 
YATESVILLE LAKE, KY 
Construction of Flood Control Reservoir. 
INSPECTIONS OF COMPLETED FLOOD CONTROL 
PROJECTS 
Inspection of Local Maintenance of Federally 
Constructed Local Protection Projects. 
Flood Control Comm. 
Doc. 1, 75th Cong., 
1st Sess. 
P.L. 534, 78th Cong., 
2nd Sess. 
H. Doc. 246, 89th Cong., 
1st Sess. 
H. Doc. 569, 87th Cong., 
2nd Sess. 
Flood Control Comm. 
Doc. 1, 75th Cong., 
1st Sess. 
Flood Control Comm. 
Doc. 1, 75th Cong., 
1st Sess. 
P.L. 534, 78th Cong., 
2nd Sess. 
Flood Control Comm. 
Doc. 1, 75th Cong., 
lst Sess. 
P.L. 534, 78th Cong., 
2nd Sess. 
H. Doc. 762, 78th Cong., 
2nd Sess. 
H. Doc. 246, 89th Cong., 
2nd Sess. 
P.L. 738, 74th Cong., 
1st Sess. 
25-19 
- I m- I - - 1 II I -~--~--a II1 I ---- ---I1CI~ 1P~-C-~ -"---- --I-I -~----L I_ -- Ce 111-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 25-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last 
Full Report Operation Contributed 
See Annual and Funds 
Project Report For Construction Maintenance Expended 
Big Sandy River 
WV and KY including 
Levisa and Tug Forks2 1952 1,586,236 1,569,8111 131,473 
Elk River, WV 1903 30,259 
Gauley River, WV4 1903 14,761 
Guyandotte River, WV5 1915 27,500 
Little Kanawha River, WV6 1960 470,536 1,023,854 
Muskingum River, OH7 1955 301,912 6,171,897 6,041 
New River, WA and VA5 1899 109,691 
Scioto River at Portsmouth, OH8 1953 10,951 16,593 
1In addition, $140,068 expended from funds transferred 
from Department of Commerce, under accelerated public 
works program, for repairs of eroded bank at lock 3 on Big 
Sandy River, at Louisa, KY. 
2Operation and Maintenance suspended June 30,1952. 
3Work closed September 1902. Property transferred to 
Kanawha River improvements. 
4Work closed September 1902. Abandonment recommended 
in H. Doc. 467, 69th Congress. 
5Work suspended. 
6Operation and maintenance suspended June 30, 1951. 
7Collections from license non-Federal hydroelectric 
utilities for use of dams on Muskingum River for fiscal years 
1923-1953 were $79,154. 
8Private Law 954, August 31, 1954, authorized Secretary 
of Treasury to pay Portsmouth sand and Gravel Co. $75,000 in 
full settlement of claims against Government for damages resulting 
from change in Scioto River Channel. 
25-20

HUNTINGTON WEST VIRGINIA DISTRICT 
TABLE 25-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last 
Full Report Operation Contributed 
See Annual and Funds 
Project Report For Construction Maintenance Expended 
Completed Local Protection Projects 
Ashland, KY 1954 3,718,839 - - 
Athens, OH 1979 5,313,700 - - 
Cattletsburg, KY 1963 3,854,361 - - 
Ceredo-Kenova, WV 1955 2,753,551 - - 
Chillicothe, OH 1986 20,373,314 - - 
East Rainelle, WV 1962 614,598 - - 
Galax, VA 1953 480,536 - - 
Huntington, WV 1956 7,172,840 - - 
Ironton, OH 1952 2,604,646 - - 
Maysville, KY 1959 6,493,747 - - 
Parkersburg, WV 1955 6,652,827 - - 
Pt. Pleasant, WV 1955 2,919,578 - - 
Portsmouth-New Boston, OH 1956 9,806,424 - - 
Princeton, WV 1962 808,750 - - 
Russell, KY 1953 552,493 - - 
Williamson, WV 1964 1,056,166 - - 
Inactive Local Protection Projects 
Augusta, KY - 11,577 - - 
Burlington, OH - - - - 
Chesapeake, OH - - - - 
Coal Grove, OH - 3,389 - - 
Coal River, WV 1979 472,229 - - 
Dover, KY - - - - 
Fullerton, KY - - - - 
Greenup, KY - 4,962 - - 
Lower Guyandotte River Basin, WV - 17,721 - - 
Miller, OH - - - - 
Normal, KY - - - - 
Proctorville, OH - - - - 
Ravenswood, WV - - - - 
South Point, OH - - - - 
South Portsmouth, KY - - - - 
Vanceburg, KY - - - - 
Deferred Local Protection Projects 
Newark, OH (Interior Drainage) 1983 - - - 
Oceana, WV 1981 611,000 - - 
Inactive Reservoirs and Lakes 
Haysi, VA - 2,656 - - 
Leading Creek, WV 1974 272,880 - - 
Panther Creek, WV 1976 22,879 - - 
Salt Creek, OH 1975 1,089,943 - - 
Utica, OH 1975 757,550 - - 
West Fork, WV 1974 663,192 - - 
Deferred Reservoir and Lakes 
Birch, WV -... 
Kehoe Lake, KY 1981 1,272,740 - - 
Logan, OH -... 
Moores Ferry, WV -... 
Active Authorized Projects with no current year expenditures. 
Martin, KY 1983 212,048 
25-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 25-G DEAUTHORIZED PROJECTS 
All projects listed in this table have been deauthorized in accordance with Section 12 of the Water Resources Development Act 
of 1974, P.L. 251, 93rd Congress. 
For Last 
Full Report Federal Contributed 
See Annual Funds Funds 
Local Protection Projects Report For Date Expended Expended 
Aberdeen, OH - May 1981 1,334 - 
Athalia, OH - Aug 1977 - - 
Belpre, OH - Nov 1977 - - 
Brooklyn, WV - Nov 1979 - - 
Buena Vista, OH - Aug 1977 - - 
Chambersburg, OH - Aug 1977 - - 
Cheshire, OH - Nov 1977 - - 
Chilo, OH - Aug 1977 - - 
Clifton, WV - Aug 1977 11,237 - 
Columbus, OH - Aug 1977 - - 
Friendly, WV - Aug 1977 - - 
Gallipolis, OH - Aug 1977 - - 
Hanging Rock, OH - Aug 1977 - - 
Hartford, WV - Aug 1977 - - 
Henderson, WV - Aug 1977 - - 
Higginsport, OH - Oct 1978 - - 
Hockingport, OH - Aug 1977 - - 
Letart, WV - Aug 1977 - - 
Letart Falls, OH - Aug 1977 - - 
Manchester, OH - May 1981 - - 
Mapleshade, OH - Oct 1978 - - 
Marietta, OH - Nov 1981 - - 
Mason, WV - Aug 1977 - - 
Middleport, OH - May 1981 9,783 - 
Millwood, WV - Aug 1977 - - 
New Martinsville, WV - Nov 1979 - - 
New Matamoras, OH - Aug 1977 - - 
Newport, OH - Aug 1977 - - 
Pomeroy, OH - Aug 1977 - - 
Portland, OH - Aug 1977 - - 
Racine, OH - Aug 1977 - - 
Ripley, OH - Oct 1978 7,523 - 
Riverview, WV - Aug 1977 - - 
St. Mary's, WV - Aug 1977 - - 
Sardis, OH - Aug 1977 - - 
Sciotoville, OH - Aug 1977 - - 
Sistersville, OH - Aug 1977 - - 
Syracuse, OH - Aug 1977 - - 
Waverley, WV - Aug 1977 - - 
Williamstown, WV - Nov 1979 - - 
Zanesville, OH - May 1981 - - 
Reservoirs and Lakes 
Big Bend, WV - Aug 1977 - - 
Big Darby, OH 1969 Nov 1979 3,349,568 - 
Frazeysburg, OH - May 1981 5,000 - 
Millersburg, OH - May 1981 - - 
Mill Creek, OH 1981 Nov 1981 1,602,702 - 
Mud River, WV - Nov 1979 - - 
Poca, WV - May 1981 - - 
Rocy Fork, OH 1950 Aug 1977 91,321 - 
White Oak Creek, OH - Nov 1981 - - 
25-22

HUNTINGTON WEST VIRGINIA DISTRICT 
TABLE 25-H INSPECTION OF FLOOD CONTROL PROJECTS - See Section 33 of Text 
Flood Control Works Inspected Dates of Inspection 
Ashland, KY Apr 87 
Athens, OH May 87 
Bramwell, WV Sep 87 
Cairo, WV Sep 87 
Canton (Nimishillen), OH Nov 87 
Cattletsburg, KY May 87 Oct 87 
Ceredo-Kenova, WV May 87 Oct 87 
Chillicothe, OH May 87 Nov 87 
East Rainelle, WV Sep 87 
Fishing Creek, Pine Grove, WV Sep 87 
Fourpole Creek, WV Sep 87 
Galax, VA Sep 87 
Grahn, KY Sep 87 
Griffithsville-Yawkey, WV Sep 87 
Hutchins, KY Sep 87 
Huntington, WV Sep 87 
Inez, KY Oct 85 
Ironton, OH Apr 87 Sep 87 
Jacksonsburg, Fishing Creek, WV Sep 87 
Maysville, KY May 87 Oct 87 
Montcalm, WV Sep 87 
Newark, OH May 87 Oct 87 
Olive Hill, KY Sep 87 
Paint Creek at Chillicothe, OH Sep 87 
Paint Creek at Washington Court House, OH Oct 87 
Parkersburg, WV May 87 Nov 87 
Pax, WV Nov 87 
Point Pleasant, WV May 87 Oct 87 
Portsmouth-New Boston, OH Apr 87 
Prestonsburg, KY Jan 87 Jun 87 
Princeton, WV Sep 87 
Richwood and Fenwick, WV Sep 87 
Right and Left Forks of Beaver Creek, KY Jan 87 
Ripley, WV Sep 87 
Roseville, OH Jun 87 
Russel, KY Apr 87 Oct 87 
Smithfield, WV Sep 87 
South Williamson, KY May 87 Nov 87 
Utica, OH Nov 87 
West Union, Middle Island, WV Sep 87 
Williamson, WV May 87 Nov 87 
25-23

PITTSBURGH, PA DISTRICT * 
This District comprises part of eastern Ohio, western 
Pennsylvania, southwestern New York, northern West 
Virginia, and northwestern Maryland embraced in 
drainage basin of Ohio River and tributaries above mile 
127 (below Pittsburgh), immediately upstream from New 
Martinsville, W. Va. 
IMPROVEMENTS 
Navigation - Locks and Dams Page 
1. Allegheny River, PA....................26-2 
2. Construction of locks and dams, 
Ohio River ............................ 26-2 
3. Monongahela River, PA and WV .......... 26-2 
4. Open-channel work, Ohio River ............ 26-3 
5. Tygart Lake, WV ....................... 26-3 
6. Other authorized navigation projects.......26-3 
Flood Control - Local Protection 
7. Allegheny River, Oil City, PA ............. 26-3 
8. Chartiers Creek, PA .................... 26-4 
9. Elkins, W V ............................ 26-4 
10. Johnstown, PA ......................... 26-4 
11. Punxsutawney, Ohio River 
Basin, PA...........................26-5 
Flood Control- Reservoirs 
12. Berlin Lake, Ohio River 
Basin, OH ............................ 26-5 
13. Conemaugh River Lake, 
Ohio River Basin, PA...................26-5 
14. Crooked Creek Lake, 
Ohio River Basin, PA.................... 26-5 
15. East Branch, Clarion River Lake, 
Ohio River Basin, PA .................... 26-6 
16. Kinzua Dam and Allegheny Reservoir, 
Ohio River Basin, PA and NY.............26-6 
17. Loyalhanna Lake, Ohio River 
Basin, PA .............................. 26-6 
18. Mahoning Creek Lake, 
Ohio River Basin, PA .................... 26-7 
19. Michael J. Kirwan Dam and 
Reservoir, Ohio River Basin, OH ........... 26-7 
20. Mosquito Creek Lake, Ohio 
River Basin, OH ........................ 26-8 
21. Ohio River Basin (Pittsburgh 
D istrict) .............................. 26-8 
22. Shenango River Lake, Ohio 
River Basin, PA and OH ................. 26-8 
23. Stonewall Jackson Lake, Ohio River 
Basin, WV ............................ 26-8 
24. Tionesta Lake, Ohio 
River Basin, PA ............. ........ 26-9 
25. Union City Dam, Ohio River 
Basin, PA...........................26-10 
26. Woodcock Creek Lake, Ohio River 
Basin, PA............................26-10 
27. Youghiogheny River Lake, Ohio River 
Basin, PA and MD ..................... 26-11 
28. Inspection of completed flood control 
projects ............................. 26-11 
29. Other authorized flood control projects .... 26-11 
30. Flood control work under special 
authorization .......................... 26-11 
General Investigations 
31. Surveys ............................. 26-11 
32. Collection and study of basic data......... 26-11 
33. Research and development...............26-11 
Tables 
Table 26-A Cost & Financial Statement ........ 26-12 
Table 26-B Authorizing Legislation............ 26-16 
Table 26-C Other Authorized Navigation Projects26-20 
Table 26-D Not Applicable ...................... 
Table 26-E Other Authorized Flood Control 
Projects.........................26-21 
Table 26-F Not Applicable .................... 
Table 26-G Deauthorized Projects ............. 26-22 
Table 26-H Allegheny River Statistics ......... 26-23 
Table 26-I Monongahela River Statistics ....... 26-24 
Table 26-J Monongahela River Total Costs ..... 26-25 
Table 26-K Ohio River Basin Local Protection 
Projects.........................26-25 
Table 26-L Ohio River Basin Reservoirs ........ 26-26 
Table 26-M Inspection of Completed Flood Control 
Projects.........................26-26 
Table 26-N Flood Control Work Under Special 
Authorization................... 26-27 
26-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation - Locks and Dams 
1. ALLEGHENY RIVER, PA 
Location. The Allegheny River is 325 miles long. It rises 
in northern Pennsylvania, flows northwestward into New 
York, thence generally southwestward to Pittsburgh, PA, 
where it joins with Monongahela River to form the Ohio. 
(See Geological Survey Charts for western Pennsylvania 
and southwestern New York.) 
Existing project. The project consists of eight locks and 
dams to afford slack-water navigation for a length of 72 
miles from Pittsburgh, PA to above East Brady, PA. Controlling 
depth through canalized portion is 9 feet at normal 
pool level. Channel width varies from a minimum of 200 
feet to full width of river at mouth. Existing project is 
complete, the last lock, No. 9, was placed in service in 1938. 
All locks and dams are in fair condition. Navigation 
channel has been widened at certain points and, in general, 
maintained to project depth, thus affording adequate 
depth for passage of commercial tows. 
Local cooperation. Fully complied with. 
Terminal facilities. City of Pittsburgh constructed a 
modern wharf for river freight. There are numerous 
privately maintained terminals and docks, consisting of 
tipples, various types of hoists, chutes, and pipelines for 
use in loading and unloading coal, stone, sand, gravel, 
petroleum products, steel products, and other 
commodities. Transshipment of freight between river and 
railroads is handled at privately owned river-to-rail 
terminals. Existing private terminals are adequate for 
shipments and receipt in Pittsburgh District of type of 
commerce now in existence. 
Operations during fiscal year: Contract for dam warning 
signs at dams 2, 3, 4, 5, 6 and 7 was awarded on March 16, 
1987 for $440,000 and progressed to 55% completion. 
Contract for erosion protection at lock and dam 7 was 
awarded on 6 August 1987 for $4,302,885. Contract for 
foundation exploration at dam 2 was awarded on 10 April 
1987 for $480,000 and progressed to 100% completion. 
Major maintenance items accomplished by the District's 
Repair Party were unwatering chamber and repairing sills 
at lock 2; repairing valves at locks 7 and 8; and purchasing 
tow haulage equipment for locks 6 and 7. Operation and 
maintenance, general: Locks were operated as required 
and necessary repairs were made to structures to maintain 
them in a serviceable condition. 
2. CONSTRUCTION OF LOCKS AND 
DAMS, OHIO RIVER 
See this heading under Ohio River portion. 
3. MONONGAHELA RIVER, PA AND WV 
Location. Formed by junction of Tygart and West Fork 
Rivers about 1 mile south of Fairmont, WV, and flows northerly 
for 128.7 miles to its junction with Allegheny River, 
forming Ohio River at Pittsburgh, PA (See Geological 
Survey Charts for southwestern Pennsylvania and northern 
West Virginia.) 
Previous project. For details see Annual Report for 
1963, page 1070. 
Existing project. Provides for improvement of river by 
9 locks and dams to afford slack-water navigation for its 
entire length from Pittsburgh to above Fairmont, WV. 
Original locks and dams 7, 8 and 9 were replaced by new 
locks and dams 7 and 8 in 1925. Increased traffic 
necessitated enlargement and improvement of locks and 
dams 1 to 6 between Pittsburgh and Rices Landing, PA, 
by building two parallel chambers and fixed concrete dams 
during 1905 and 1932. Locks and dam 1 were eliminated 
in 1938 by raising Emsworth Dam, Ohio River. 
Reconstruction of lock 2 was completed in 1953 to provide 
two modern navigation chambers. The existing locks and 
dam 2 were originally completed in 1907; major modifications 
were made in 1923 and 1924, and in 1926 the upper 
guard and guide walls were extended. Construction of 
Maxwell locks and dam and the reconstruction of dam 4 
have allowed for removal of obsolete locks and dams 5 and 
6. Small and antiquated original locks and dams 10 to 15, 
inclusive, have been replaced by three modern structures. 
Morgantown lock and dam, initial step in replacement program, 
was completed in 1950 replacing locks and dams 10 
and 11. Hildebrand lock and dam, next upstream, was 
completed in 1959 replacing locks and dams 12 and 13. 
Raising crest of dam 8 was also completed in 1959 as part 
of upper river improvement and eliminates restricted 
depth in upper reach of pool. Opekiska lock and dam was 
completed in 1967 replacing locks and dams 14 and 15. 
Completion of this link in upper river replacement program 
provides for entire river length of minimum channel 
depth of 9 feet, varying in width from a minimum of 250 
feet to practically full width at mouth. 
Locks and dam 3 showed advanced stages of deterioration 
and, because of its strategic location and its importance 
to industry throughout the Greater Pittsburgh area 
and the nation, emergency remedial work had to be done 
in 1977. Major rehabilitation of locks and dam 3 was completed 
on Oct. 27, 1980. 
Local cooperation. None required. 
Terminal facilities. City of Pittsburgh constructed a 
modern wharf for freight. Boat landings are maintained 
by some municipalities along the river. A large number of 
tipples at mines and various types of hoists at manufacturing 
plants and sand and gravel supply companies are 
maintained for private use in loading and unloading coal, 
coke, billets, steel products, sand, gravel, and other commodities. 
These terminals and docks are not available for 
general commerce. A number of docks and pipelines are 
also privately maintained for petroleum and acid products. 
Marine ways are maintained by some of the larger 
industries. There are also several terminals for rail-to-river 
and river-to-rail transfer. Facilities are considered adequate 
for existing commerce. 
Operations during fiscal year: New work: The Water 
Resources Development Act of 1986 authorized the 
replacement of Lock and Dam 7 with Grays Landing Lock 
and Dam and the construction of a new lock landward of 
the existing lock at Lock and Dam 8 (to be renamed Point 
Marion Lock and Dam). On Grays Landing, activities during 
the fiscal year included the completion of Feature 
Design Memoranda for Bank Excavation for the Lock and 
Dam and for Real Estate. Work continued on cultural 
resources investigations and on real estate acquisition at 
26-2

PITTSBURGH, PA., DISTRICT 
the lock site. Work began on plans and specifications for 
the bank excavation contract. On Point Marion, activities 
during the fiscal year included completion of the General 
Design Memorandum for the project and initiation of 
work for the Feature Design Memorandum for the Lock. 
Major Maintenance: Contract for painting tainter gates, 
valves and bulkheads at Morgantown, Hildebrand and 
Opekiska, awarded in FY 1983 for $395,430 was completed. 
Contract for stone protection, upper guard wall extension, 
lock and dam 4, was awarded on 5 January 1987 
for $309,675 and was completed. Contract for painting 
emergency bulkheads and footbridge at locks and dam 4 
was awarded on 18 February 1987 for $79,000 and was 
completed. Contract for erosion protection at locks and 
dam 2, was awarded on 27 February 1987 for $2,064,295 
and progressed to 75% complete. Contract for dam 
rehabilitation at Point Marion was awarded on 9 June 
1987 for $2,450,300, but no physical work was accomplished. 
Contract for upper guard wall repairs at locks and dam 
2 was awarded on 11 June 1987 for $136,375 and progressed 
to 63% complete. Major maintenance items 
accomplished by the District Repair Party were dewatering 
chambers at Lock 2 and Maxwell; gate repairs at locks 
2 and 3; and valve repairs at locks 7,8 and Morgantown. 
Operations and Maintenance, General: Locks were 
operated as required and necessary repairs were made to 
structures to maintain them in a serviceable condition. 
4. OPEN-CHANNEL WORK, OHIO 
RIVER 
See this heading under Ohio River portion. 
5. TYGART LAKE, WV 
Location. Tygart Lake is located on the Tygart River 
in Taylor and Barbour Counties, northcentral WV. The 
lake is approximately 26 road miles due east of 
Clarksburg, WV and 30 road miles south of Morgantown. 
The dam is situated 22.7 river miles above the mouth of 
the Tygart River at Fairmont, or 2.25 miles upstream from 
Grafton, WV, and about 78 miles south of Pittsburgh, PA. 
(See Geological Survey Charts for Fairmont, Thornton, 
and Belington, WV.) 
Existing project. A reservoir for low water regulation 
and flood control. Dam is concrete gravity type with an 
uncontrolled center spillway flanked by abutment sections 
joining valley sides. Project was authorized by Public 
Works Administration January 11, 1934, and adopted by 
1935 River and Harbor Act. For further project description 
see Annual Report for 1962. Authorized project is 
complete. Reservoir is in operation for low water control 
in Monongahela River and for purpose of flood protection 
in Monongahela and Ohio Valleys. Construction of dam 
was started in 1935 and placed in operation in 1938. Land 
acquired for project consists of 2,662.9 acres in fee, 
flowage easements over 1,216.9 acres and 1,731.9 acres of 
other easements. 
Local cooperation. The State of West Virginia has 
assumed responsibility for the development and operation 
of hunting and fishing areas as well as the Tygart Lake 
State Park. Controlled releases for downstream navigation 
and recreation are also coordinated with others to the 
extend feasible. No local cooperation is required at completed 
project; however, future recreational developments 
are subject to certain conditions of non-Federal costsharing 
under Federal Water Project Recreation Act of 
1965. A cost-sharing agreement was executed with the 
West Virginia Department of Recreation in May 1981. 
Operations during fiscal year. Operation and 
maintenance, general; Contract for Concrete Repairs for 
Parapet Walls and Roadway, awarded 19 May 1986, was 
completed. Reservoir was operated for benefit of flood control 
and low water regulation, as required, and project 
structures were operated and maintained in a serviceable 
condition throughout the year. Estimated flood control 
benefits achieved by this reservoir for this period were 
$1,883,000. Total flood control benefits for this reservoir 
through September 30, 1987 are $528,700,000. Activities 
under reservoir management program comprising sanitation 
measures, conservation, land management, and 
operation and maintenance of public-use facilities continued. 
This work was limited in scope as State of West 
Virginia has jurisdiction over recreation in reservoir area. 
6. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See Table 26-C on other authorized navigation projects. 
Flood Control - Local Protection 
7. ALLEGHENY RIVER, OIL CITY, PA 
Location. Oil City is located in Venango County, PA at 
the junction of Oil Creek and the Allegheny River 
(Allegheny River Mile 132.1). See Geological Survey Chart 
for Oil City, PA. 
Existing Project: Ice jams and ice-related flooding have 
plaqued Oil City for more than a century. Traditional approaches 
(dredging, walls, dikes, etc.) in past studies could 
not provide a cost-effective solution. The most recent 
study was conducted under the general authority of Section 
205 of the 1948 Flood control Act, as amended. What 
was different about this study effort was the involvement 
of the Corps Cold Regions Research and Engineering 
Laboratory (CRREL). After extensive investigations to 
determine the causes of the ice jam flooding, CRREL 
recommended the installation of a floating ice control 
structure (ICS) on the Allegheny River and fixed ICS on 
Oil Creek. 
The Allegheny River ICS consists of a series of steel pontoons 
and floats connected to 2 1/4 inch diameter steel 
cables which are anchored on each shore, approximately 
0.4 miles above the junction of Oil Creek. The Oil Creek 
ICS will consist of a Bascule gated dam in Oil Creek with 
earthen dike extensions on both creek banks and a supplemental 
floating ICS approximately 75 feet upstream 
from the dam. The concrete dam will be approximately 351 
feet long and 5 feet high, and will be located in the Oil 
Creek State Park, approximately 5.2 miles above the 
creeks mouth at the Allegheny River. Estimated first cost 
for the project is $3,932,000, of which $3,911,000 is 
Federal and $21,000 is non-federal. 
26-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Local Cooperation: The city of Oil City is responsible for 
the acquisition of required project land interests and the 
operation and maintenance of the ice control structures. 
To date, the city has acquired all the necessary rights-ofway 
for both the river and the creek ICS. The city has 
operated and maintained the Allegheny River ICS 
through the 1985 and 1986 winter seasons. 
Operations during fiscal year: Installation of the 
Allegheny River structure was completed in October 1983 
at a cost of $802,000, and subsequently turned over to the 
city for operation on 16 December 1983. A contract was 
awarded on 27 August 1987 for the Oil Creek ICS in the 
amount of $2,225,000. The project is scheduled to be complete 
by 1 November 1988. Cumulative flood damages 
prevented by the project were estimated to be $24,000. 
8. CHARTIERS CREEK, PA 
Location. Within Washington and Allegheny Counties, 
southwestern Pennsylvania, a tributary of Ohio River. 
(See Geological Survey Chart for Carnegie, PA) 
Existing project. Provides for channel widening, deepening 
and realignment, construction of a major channel 
cutoff, and relocations in two separate and independent 
reaches. James G. Fulton project in Allegheny County 
would be about 13.4 miles long and Canonsburg-Houston 
reach in Washington County about 4.7 miles long. Completed 
improvments would contain within banks, all floods 
up to the 1912 maximum of record, but with some residual 
damage, and would greatly reduce flood stages and 
damages resulting from higher floods. James G. Fulton 
Flood ControlProject-Construction of Unit I was started 
in July 1968, completed in September 1970, and turned 
over to local interests for operation and maintenance on 
June 25, 1971. Construction of Unit 2 was started in April 
1970, completed in April 1973, and turned over tolocal interests 
on November 22, 1974. Construction of Unit 3 was 
started in July 1971 and was completed in December 1974. 
Construction of Unit 5 was started in June 1972 and was 
Completed in December 1973. Construction of Unit 4 
channel improvement was started in July 1978, completed 
in June 1981 and turned over to local interests on 18 
November 1981. A contract for Environmental Improvement, 
Unit 4, James G. Fulton, was awarded in Sep 1981 
and completed in Dec 1981. Canonsburg-Houston Reach- 
Construction of Unit I was started in December of 1968, 
completed in March 1970, and turned over to local interests 
for operation and maintenance on August 10,1970. 
Construction of Unit 2A was started January 17, 1976, 
completed December 16, 1976, and turned over to local interests 
on June 9, 1977. Construction plans and specifications 
for Unit 2B, the remaining unit of the reach, are 99% 
complete. Remaining work on project has been delayed 
due to the inability of local cooperating agency to provide 
the necessary rights-of-way. Project was authorized by 
Flood Control Act of 1965. 
Estimated cost for new work (1985) is $41,850,000 of 
which $32,750,000 is Federal cost and $9,100,000 non- 
Federal cost. 
Local cooperation. Requirements are described in full on 
page 26-3 of FY 1981 Annual Report. Local cooperating 
agency (Washington County) has been unable to provide 
the necessary rights-of-way for the remaining Unit 2B. 
Direct non-Federal contributions have been made in the 
amount of $4,225,188. 
Operations during fiscal year. Regular inspections were 
made at completed units. Estimated flood control benefits 
achieved by the Chartiers Creek project through 
September 30, 1987, totaled $15,888,000. 
9. ELKINS, WV 
Location. On Tygart River in north-central Randolph 
County, WV, about 155 miles south of Pittsburgh, PA. It 
is at downstream end of a long, broad reach of upper 
Tygart Valley, about 75 miles above mouth of river. (See 
Geological Survey Chart for Elkins, WV) 
Existing project. Provides flood protection by diverting 
flood discharges from upstream arm of loop of natural 
river channel into an artifical cutoff channel, thereby 
bypassing City of Elkins. Improvement is designed to accommodate 
discharges equivalent to maximum flood of 
reasonable expectancy. Project construction was started 
May 1946 and completed May 1949. Completed works, except 
that portion of channel maintained by Federal 
Government, has been operated and maintained by City 
of Elkins since March 31, 1949. Land acquired for project 
consists of 32.04 acres in fee and 526.01 acres in 
easements. Project was authorized by 1938 Flood Control 
Act. For further project description see Annual Report for 
1962, page 1222. Federal cost of completed project was 
$1,772,627; estimated non-Federal cost for lands, 
easements, and rights-of-way was $40,000. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Operation and 
maintenance, general: Contract for Replacement of trash 
boom was awarded on 8 Oct 86 for $35,700 and was Completed. 
Project was last inspected in June 1986. 
Cumulative total flood damages prevented to September 
30, 1986, totaled $14,311,000. 
10. JOHNSTOWN, PA 
Location. Project is located in southwestern Cambria 
County, PA, about 58 miles east of Pittsburgh, PA. It is 
in a deep and comparatively narrow valley at junction of 
Stoney Creek and Little Conemaugh River, which unite 
to form Conemaugh River. (See Geological Survey Chart 
for Johnstown, PA.) 
Existing project. Provides for increased channel 
capacity by enlarging and realigning channels and protecting 
banks with concrete pavement. Improvement designed 
to accommodate discharges equivalent to those of 
March 1936 flood, maximum natural flow of record, 
minimum of overbank flow and to practically eliminate 
damages therefrom. Project construction began in August 
1938 and was completed November 1943. Footer protection 
for Unit 4 was completed in November 1949. Land acquired 
for project consists of easements over 192 acres. 
Project was authorized by Flood Control Acts of 1936 and 
1937. For further project description see Annual Report 
for 1962, page 1215. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938, applies. 
26-4

PITTSBURGH, PA., DISTRICT 
Operations during fiscal year. Operation and 
maintenance, general: Operation activities and routine investigations 
were made. Project was last inspected in 
April, 1986. Cumulative flood damages prevented by project 
were estimated to be $417,940,000 to end of 
September 1987. 
11. PUNXSUTAWNEY, OHIO RIVER 
BASIN, PA 
Location. Borough of Punxsutawney is on Mahoning 
Creek in Jefferson County, PA, about 85 miles northeast 
of Pittsburgh, PA. It is on a comparatively wide, alluvial 
flood plain about 52 miles above mouth of stream and 30 
miles above Mahoning Creek flood control dam. (See 
Geological Survey Charts for Punxsutawney and 
Smicksburg, PA.) 
Existing project. Provides flood protection by channel 
enlargement, dikes, and walls. Improvement is designed 
to accommodate discharges 20% greater than that of maximum 
flood of record. Construction was accomplished by 
construction of four units. Construction started May 1946 
and was completed June 1950. Land acquired for project 
consists of perpetual easements over 72.6 acres. Completed 
works, except that portion of channel maintained 
by the Federal Government have been operated and maintained 
by Borough of Punxsutawney since July 31, 1950. 
Project was authorized by 1938 Flood Control Act. For 
further project description see Annual Report for 1962, 
page 1209. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Operation and 
maintenance, general: Operation activities continued and 
routine investigations were made. Project was last inspected 
in October 1986. Cumulative flood damages 
prevented by project were estimated to be $28,913,000 to 
end of September 1987. 
Flood Control - Reservoirs 
12. BERLIN LAKE, OHIO RIVER 
BASIN, OH 
Location. Dam is on Mahoning River about 73 miles 
above its confluence with Shenango River. It is about 10 
miles above existing Milton Reservoir Dam and 35 miles 
upstream from Warren, Ohio. Reservoir is in Portage, 
Mahoning and Stark Counties, OH. (See Geological 
Survey charts for Warren, Ravenna, and Alliance, OH.) 
Existing project. A reservoir for flood control and water 
supply. Dam consists of a partially controlled, concrete 
gravity, center spillway flanked by rolled-earthfill abutment 
sections joining valley sides. Authorized project is 
complete and in operation for flood control and low water 
regulation purposes in industrialized Mahoning Valley 
below. Construction of dam was started January 1942 and 
completed June 1943. Present project lands consists of 
6,885.3 acres in fee and 1,098.7 acres in easements. For 
further project description, see Annual Report for 1962, 
page 1233. 
Local cooperation. None required at completed project; 
however, future recreational developments are subject to 
certain conditions of non-Federal cost-sharing under 
Federal Water Project Recreation Act of 1965. 
Operations during fiscal year. Contract for construction 
of Administration Building was awarded on April 30,1987 
for $338,403 and progressed to 32% completion. Reservoir 
was operated as required and necessary repairs were made 
to structures and appurtenances. Estimated flood control 
benefits achieved by this reservoir for this period were 
$5,408,000; total benefits through September 30,1987 are 
$223,091,000. Activities under reservoir management program 
comprising sanitation measures, conservation, land 
management, and operation and maintenance of publicuse 
facilities continued. 
13. CONEMAUGH RIVER LAKE, 
OHIO RIVER BASIN, PA 
Location. Dam is on Conemaugh River in Indiana and 
Westmoreland Counties, PA, 7.5 miles above junction of 
Conemaugh River and Loyalhanna Creek, which form the 
head of the Kiskiminetas River. It is about 2 miles northeast 
of Tunnelton, PA, and about 42 miles east of Pittsburgh, 
PA. Reservoir is in Westmoreland and Indiana 
Counties, PA. (See Geological Survey Charts for Latrobe, 
New Florence, and Elders Ridge, PA.) 
Existing Project. A flood control reservoir dam of concrete 
gravity type with a gate-controlled center spillway 
flanked by abutment sections joining valley sides and an 
earth embankment ending in right abutment. Authorized 
project is complete. Reservoir system designed for protection 
of Pittsburgh and reduction of flood heights in upper 
Ohio Valley, generally. Land acquired for dam, reservoir 
and railroad relocation consists of 7,618.1 acres in fee 
and 518.5 acres in easements. Project authorized by Flood 
Control Acts of 1936 and 1938. For further project description 
see Annual Report for 1962, page 1217. 
Local cooperation. None required by law. 
Operations during fiscal year. Operation and 
maintenance, general: Contract for Painting Crest Gates 
and Service bridge was awarded 27 Feb 87 at an estimated 
$90,000 and progressed to 30% complete. Reservoir was 
operated for benefit of flood control as required, and 
necessary repairs were made to structures and appurtenances. 
Estimated flood control benefits achieved by 
this reservoir for this fiscal year were $2,619,000; total 
flood control benefits through September 30, 1987 are 
$562,347,000. Activities under reservoir management program 
comprising sanitation measures, conservation, land 
management and operation and maintenance of public-use 
facilities were continued. 
14. CROOKED CREEK LAKE, OHIO 
RIVER BASIN, PA 
Location. Dam is on Crooked Creek 6.7 miles above junction 
of creek with Allegheny River near Ford City, PA, and 
about 32 miles northeast of Pittsburgh, PA. (See 
Geological Survey Charts for Freeport and Elders Ridge, 
PA.) 
Existing project. A flood control reservoir dam of earthfill 
type with separate uncontrolled saddle spillway and 
26-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
tunnel outlet works. Authorized project is complete. 
Reservoir is in operation as a unit of a coordinated reservoir 
system designed for protection of Pittsburgh and 
reduction of flood heights in upper Ohio Valley, generally. 
Construction of dam was started in March 1938 and 
completed October 1940. Present project lands consist of 
2,563.6 acres in fee and 99.98 acres in easements. Project 
was authorized by Flood Control Acts of 1936 and 1938. 
For further project description see Annual Report for 
1962, page 1213. 
Local cooperation. None required by law. 
Operations during fiscal year: Major maintenance: Contract 
for construction of water supply and waste water 
systems, awarded on 13 January 1986 for $399,700, was 
completed. Contract for construction of maintenance complex 
and administation building was awarded on 23 
September 1986 for $896,149 and progressed to 91% completion. 
Contract for grading, drainage and paving improvements 
was awarded on 2 June 1987 for $254,494 and 
progressed to 50% complete. Operation and maintenance, 
general: Master Plan Design Memorandum No. 2 was approved 
on June 3, 1987. Reservoir was operated for benefit 
of flood control, as required, and necessary repairs were 
made to structures and appurtenances. Total flood control 
benefits achieved by this reservoir through September 
30, 1987 are $123,748,000. Activities under reservoir 
management program comprising sanitation measures, 
conservation, land management, and operation and 
maintenance of public-use facilities continued. 
15. EAST BRANCH, CLARION RIVER 
LAKE, OHIO RIVER BASIN, PA 
Location. Dam is in Elk County, PA on East Branch of 
Clarion River above Middle Fork, 7.3 miles above junction 
of East and West branches of Clarion River at Johnsonburg, 
PA, and about 105 miles northeast of Pittsburgh, 
PA. Reservoir is in Elk County, PA. (See Geological 
Survey Chart for Mount Jewett, PA.) 
Existing project. A reservoir for flood control and lowwater 
regulation. Dam is rolled-earthfill type with gatecontrolled 
concrete tunnel under right abutment and a 
paved uncontrolled spillway on left abutment slope. 
Authorized project is complete. Reservoir is in operation 
for low-water regulation purposes in Clarion River Valley 
below and for flood control as a unit of a coordinated reservoir 
system for protection of Pittsburgh and upper Ohio 
Valley, generally. Construction of dam was started in June 
1947 and completed in July 1952. Present project lands 
consist of 287.2 acres in fee and 1,296.7 acres in easements. 
Project was selected for construction under general 
authorization for Ohio River Basin in Flood Control Acts 
of 1938 and 1944. For further project description see Annual 
Report for 1962, page 1206. 
Local Cooperation. None required by law. 
Operations during fiscal year. Operations and 
maintenance, general; Reservoir was operated for flood 
control and low-water regulation, as required; and 
necessary repairs were made to structures and appurtenances. 
Estimated flood control benefits achieved by 
this reservoir during this fiscal year were $227,000; total 
benefits through September 30, 1987 are $32,210,000. 
Some reservoir management activity was performed 
throughout the year comprising sanitation measures, conservation, 
land management and operation of public-use 
facilities. Work was limited in scope as bulk of reservoir 
lands are owned by Commonwealth of Pennsylvania. 
16. KINZUA DAM AND ALLEGHENY 
RESERVOIR, OHIO RIVER BASIN 
PA AND NY 
Location. Dam site is on Allegheny River 9 miles above 
Warren, PA, and 198 miles above mouth of river at Pittsburgh, 
PA. Reservoir is in Warren and McKean Counties, 
PA., and Cattaraugus County, NY. (See Geological 
Survey Charts for Warren and Kinzua, PA -NY, and Randolph 
and Salamanca, NY.) 
Existing project. Reservoir provides flood control, low 
water regulation, and recreation. Dam consists of a combination 
concrete gravity structure and rolled earth embankment 
with gate-controlled spillway and discharge 
conduits controlled by slide-gates in gravity section. Construction 
of project, initiated in February 1960, is complete. 
Construction of dam was started in September 1960 
and completed in December 1965. Development of recreation 
area at Onoville under a cost-sharing agreement with 
Cattaragus County was completed in June 1978. Land acquired 
for project consists of 2,646.6 acres in fee and 
easements over 22,420.4 acres. For further details see Annual 
Report for 1962, page 1202. Project was authorized 
by Flood Control Acts of 1936, 1938 and 1941. 
Local cooperation. None required by law. 
Licenses. The Federal Power Commission granted a 
license to Pennsylvania Electric Company and Cleveland 
Electric Illuminating Company on December 28,1965, for 
the joint construction, operation and maintenance of a 
325-megawatt pumped-storage installation (FPC Project 
No. 2280). The project is complete. 
Operation during fiscal year. Operation and 
maintenance, general: Reservoir was operated for benefit 
of flood control and low water regulation, as required, and 
necessary repairs were made to structures and appurtenances. 
Estimated flood control benefits achieved by 
this reservoir for this period were $3,994,000; total to end 
of this fiscal year, $333,055,000. Of 2,212 surface tracts 
authorized for acquisition, all have been acquired but are 
subject to a final audit. Activities under reservoir management 
program comprising sanitation measures, conservation, 
land management, and operation and maintenance 
of public-use facilities continued. 
17. LOYALHANNA LAKE, OHIO 
RIVER BASIN, PA 
Location. Dam is on Loyalhanna Creek, 4.5 miles above 
junction of creek with Conemaugh River at Saltsburg, PA, 
and about 29 miles east of Pittsburgh, PA. Reservoir is 
in Westmoreland County PA. (See Geological Survey 
Chart for Latrobe, PA). 
Existing project. A flood control reservoir dam of concrete 
gravity type with a gate-controlled center spillway 
26-6

PITTSBURGH, PA., DISTRICT 
flanked by abutment sections joining valley sides, and an 
earth embankment section ending in left abutment. 
Authorized project is complete. Reservoir is in operation 
as a unit of a coordinated reservoir system designed for 
protection of Pittsburgh and reduction of flood heights in 
upper Ohio Valley, generally. Construction of dam was 
started in October 1939 and completed in June 1942. Land 
acquired for project consists of 3,334.7 acres in fee and 
easements over 86.7 acres. Project was authorized by 
Flood Control Acts of 1936 and 1938. For further project 
description see Annual Report for 1962, page 1219. 
Local cooperation. None required by law. 
Operations during fiscal year. Operation and 
maintenance, general: Contract for Concrete Repairs, 
Parapet Walls and Roadway, was awarded on 12 June 
1986 for $200,695 and was completed. Reservoir was 
operated for benefit of flood control, as required, and 
necessary repairs were made to structures and appurtenances. 
Estimated flood control benefits achieved by 
this reservoir for this fiscal year were $407,000; total 
benefits to September 30, 1987, $165,724,000. Activities 
under reservoir management program comprising sanitation 
measures, conservation, land management and operation 
and maintenance of public-use facilities continued. 
18. MAHONING CREEK LAKE, 
OHIO RIVER BASIN, PA 
Location. Dam is on Mahoning Creek in Armstrong 
County, PA, 21.6 miles above junction of creek with 
Allegheny River. It is about 6.50 miles southeast of New 
Bethlehem, PA, and about 51 miles northeast of Pittsburgh, 
PA. Reservoir is in Armstrong, Indiana, and Jefferson 
Counties, PA. (See Geological Survey Charts for 
Rural Valley and Smicksburg, PA). 
Existing project. A flood control reservoir dam of concrete 
gravity type with a gate-controlled center spillway 
flanked by abutment sections joining valley sides. 
Authorized project is complete. Reservoir is in operation 
as a unit of a coordinated reservoir system designed for 
protection of Pittsburgh and reduction of flood heights in 
upper Ohio Valley, generally. Construction of dam was 
started in February 1939 and completed in June 1941. 
Land acquired for projects consists of 2,519.36 acres in fee 
and easements over 83.5 acres. Project was authorized by 
Flood Control Acts of 1936 and 1938. For further project 
description see Annual Report for 1962, page 1210. 
Local cooperation. None required at completed project. 
On November 4, 1977 a contract for Wildlife development 
at Mahoning Creek Lake was executed between the U.S. 
Government and the Pennsylvania Game Commission. 
Each party will pay or contribute in kind 50% of the first 
cost of initial wildlife development. Cost-sharing for construction 
of fishing access area awarded in September 
1980 was completed in July 1981 for $335,405.75. On June 
7, 1979, a contract for fishing and boating development 
at Mahoning Creek Lake was executed between the U.S. 
Government and Pennsylvania Fish Commission. Each 
party will pay or contribute in kind 50% of the first costs 
of initial fishing and boating development. Cost-sharing 
contract for construction of hunting access areas awarded 
July 30, 1980 was completed on Nov 25, 1981 at a final 
cost of $44,540. On September 9, 1980, a contract for camping 
and day-use recreational development was executed 
between the U.S. Government and the County of Armstrong. 
Each party will pay or contribute in kind 50% of 
the first costs of initial camping and day-use recreational 
development and 50% of the costs for future development. 
Cost-sharing contract for Construction of Milton Loop 
Recreation Area awarded July 19, 1981 was completed on 
September 17, 1982 for $467,842. Each cooperation 
authority is responsible for operation, maintenance and 
replacement without cost to the Government of all 
facilities developed with their support. 
Operations and results during fiscal year. Operations 
and maintenance, general: Reservoir was operated for 
benefit of flood control as required, and necessary repairs 
were made to structures and appurtenances. Total flood 
control benefits achieved by this reservoir through 
September 30, 1987 were $155,338,000. Activities under 
reservoir management and maintenance for public-use 
facilities continued. 
19. MICHAEL J. KIRWAN DAM AND 
RESERVOIR, OH 
Location. Dam site is on West Branch of Mahoning 
River which joins Mahoning River at Newton Falls, OH. 
It is 11 miles above mouth of branch and about 15 miles 
upstream from Warren, OH. Reservoir is in Portage County, 
OH. (See Geological Survey Charts for Ravenna, Garrettsville, 
Chagrin Falls, and Kent, OH.) 
Existing project. Reservoir provides flood control, lowwater 
regulation and recreation. Dam consists of a rolledearth 
embankment structure with gate-controlled outlet 
works and an uncontrolled side-hill spillway through left 
abutment. Authorized project is completed and in operation 
for flood control and low water regulation purposes. 
Construction of dam and access road was started in May 
1963 and completed in November 1966. Land acquired for 
project consists of 6,298.9 acres fee and easements over 
27.9 areas. For further description see Annual Report for 
1962, page 1231 (West Branch Reservoir, Mahoning 
River, Ohio). Project was authorized by 1958 Flood Control 
Act (H. Doc. 191, 85th Cong. 1st sess.). with local contribution 
requirements modified by Flood Control Act of 
1960. Federal costs of completed project was $17,370,000. 
Local interests contributed $3,230,000 during period of 
construction bringing initial project cost to $20,600,000. 
Local cooperation. Local interests must contribute 
$5,200,000 for water pollution abatement and for 
municipal and industrial water supply purposes, of which 
$3,230,000 was paid in cash during construction. Unpaid 
balance at time project is placed in operation, $1,970,000, 
will be paid in cash at that time or on an annual basis. Of 
the unpaid balance of contributed funds due and payable, 
payment in full of Trumbull County's share in the amount 
of $663,040 has been received. Mahoning County elected 
to pay their share ($1,306,960) in 50 annual installments 
of $50,323.32, including interest, and has paid $530,881.24 
toward principal to date. Local interests have now contributed 
$4,423,921.24 towards total of $5,200,000 non- 
Federal costs. 
Operations during fiscal year. Operation and 
26-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
maintenance, general: Reservoir was operated for benefit 
of flood control and low-flow augmentation, as required, 
and necessary repairs were made to structures and appurtenances. 
Estimated flood control benefits achieved by 
this dam for this fiscal year were $2,781,000. Total flood 
control benefits for this reservoir through September 30, 
1987 are $79,180,000. Activities under reservoir management 
program comprising sanitation measures, conservation, 
land management, and operation and maintenance 
of public-use facilities continued. 
20. MOSQUITO CREEK LAKE, OHIO 
RIVER BASIN, OH 
Location. Dam is on Mosquito Creek, 9 miles above junction 
of creek with Mahoning River at Niles, OH, and about 
18 miles northwest of Youngstown, OH. (See Geological 
Survey Charts for Bristolville and Kinsman, OH, and 
Pennsylvania.) 
Existing project. A reservoir for flood control, low-water 
regulation and water supply storage. Dam is rolledearthfill 
type with outlet facilities through dam, and an 
uncontrolled natural wasteway to discharge overflow from 
reservoir. Authorized project is complete and in operation 
for flood control and low-water regulation purposes in industrialized 
Mahoning and Beaver Valleys below. Construction 
of dam was started in July 1943 and was ready 
for benefical use in January 1944. Land acquired for project 
consists of 11,180.6 acres in fees and easements over 
276.0 acres. State of Ohio has a license from Secretary of 
the Army for development and operation of recreation 
facilities in reservoir area. Project was selected for construction 
under general authorization for Ohio River 
Basin in 1938 Flood Control Act. For further project 
description see Annual Report for 1962, page 1228. 
Local cooperation. None required at completed project; 
however, future recreational developments are subject to 
certain conditions of non-Federal cost-sharing under 
Federal Water Project Recreation Act of 1965. 
Operations results during fiscal year. Operation and 
maintenance, general: Reservoir was operated for benefit 
of flood control and low-flow regulation as required, and 
necessary repairs were made to structures and appurtenances. 
Estimated flood control benefits achieved by 
this dam for this fiscal year were $2,213,000. Total flood 
control benefits for this reservoir through September 30, 
1987 are $62,015,000. Activities under reservoir managment 
program comprising sanitation measures, conservation, 
land management and operation and maintenance of 
certain public-use facilities continued. This work was 
limited in scope as State of Ohio has jurisdiction over 
recreation in reservoir area. 
21. OHIO RIVER BASIN 
(PITTSBURGH DISTRICT) 
Location. A series of dikes, floodwalls, channel improvements, 
and reservoirs/lakes in Ohio River Basin 
within Pittsburgh District. 
Existing project. Individual projects considered in comprehensive 
plan within Pittsburgh District. (See Tables 
26-B, 26-K and 26-L on Acts authorizing existing projects, 
local protection projects and reservoirs.) 
Operations during fiscal year. New work: None by the 
United States except as stated in individual projects. 
Completed local protection projects operated and maintained 
by local interests, including those projects for 
which individual reports have been included, prevented 
flood damages of an estimated $4,913,000 during this 
fiscal year. Total flood damages prevented through 
September 30, 1987 are $704,227,000. 
22. SHENANGO RIVER LAKE, OHIO 
RIVER BASIN, PA AND OH 
Location. Dam is on Shenango River about 0.8 mile 
above Sharpsville, PA, and about 33 miles above junction 
of river with Mahoning River, which unite near New Castle, 
PA, to form Beaver River. Reservoir is in Mercer 
County, PA and Trumbull County, Ohio. (See Geological 
Survey Chart for Kinsman, Ohio, and Shenango, PA.) 
Existing project. A reservoir for flood control, low-flow 
augmentation and recreation. Dam consists of a concrete 
gravity structure with gate-controlled outlet works and 
an uncontrolled center spillway section. Authorized project 
is complete. Reservoir is in operation for low-water 
regulation purposes in Shenango River valley below and 
for flood control as a unit of a coordinated reservoir system 
for protection of Shenango River valley and the Beaver 
and upper Ohio River Valley, generally. Construction of 
dam was started in March 1963 and completed in May 
1965. Land acquired for project consists of 14,632.2 acres 
in fee and easements over 197.7 acres. Future work consists 
of completion of project lands of any additional 
recreation facilities as required to serve the public needs. 
For further project description, see Annual Report for 
1962, page 1230. Project was authorized by 1938 Flood 
Control Act. 
Local cooperation. None required by law. 
Operations during fiscal year. Operation and 
maintenance, general: Contract for Ranger Check Station 
was awarded on 25 October 1985 for $221,800 and was 
completed during the fiscal year. Reservoir was operated 
for benefit of flood control and low-flow augmentation, as 
required, and necessary repairs were made to structures 
and appurtenances. Estimated flood control benefits 
achieved by this reservoir for this period were $674,000. 
Total flood control benefits for this dam through 
September 30, 1987 are $19,383,000. Activities under 
reservoir management program comprising sanitation 
measures, conservation, land management and operation 
and maintenance of public-use facilities continued. 
23. STONEWALL JACKSON LAKE, 
WV 
Location. In Lewis County, North Central West 
Virginia, on the West Fork River, which joins the Tygart 
River at Fairmont, West Virginia to form the 
Monongahela River. Damsite is located at Brownsville, 
West Virginia, about 4 miles south of Weston and 72 miles 
above mouth of West Fork River at Fairmont, WV. (See 
Geological Survey Charts for Weston and Crawford, WV.) 
26-8

PITTSBURGH, PA., DISTRICT 
Existing project. Provides for construction of a reservoir 
for flood control, water supply, water quality control, 
area redevelopment and recreation. Dam would be of the 
concrete gravity type, 95 feet high and 620 feet long. 
Outlet works will consist of five multi-level sluices, 
spillway will be uncontrolled. Storage capacity will be 
74,650 acre-feet controlling an area of 102 square miles. 
Project was authorized by 1966 Flood Control Act. 
Estimated initial Federal cost for new work (1987) is 
$212,000,000 (includes $21,270,000 reimbursement by 
non-Federal interests.) 
Local cooperation. Local interests are required to make 
arrangements for repayment, under the provisions of the 
Water Supply Act of 1958, as amended, of that part of the 
construction cost and annual operation, maintenance and 
replacement costs allocated to municipal and industrial 
water supply, an amount presently estimated at 
$4,200,000 for construction; and $15,000 annually for 
operations, maintenance and replacements. Also, in accordance 
with Federal Water Project Recreation Act, local 
interests are required to administer projectiland and water 
areas for recreation and fish and wildlife enhancement, 
pay, contribute in kind or repay (which may be through 
user fees) with interest, one-half of the separable first costs 
of the reservoir project allocated to recreation and fish and 
wildlife enhancement, an amount presently estimated at 
$17,070,000; bear all costs of operation, maintenance and 
replacement of recreation and fish and wildlife land and 
facilities, the amount involved being currently estimated 
on an average annual basis to be $1,162,000, exercise to 
the full extent of their legal capability, control against 
removal of streamflow made available for water quality 
control; and contribute to the control of pollution of 
streams subject to low-flow augmentation by adequate 
treatment or other methods of controlling wastes at their 
source. The requirements of Section 221 were amended in 
1971 to exempt assurances for future demands for water 
supply pursuant to the Water Supply Act of 1958 from the 
contractual requirements of the Act. Accordingly, the 
city of Weston, West Virginia, has provided assurances 
that it will enter into a water supply contract with the 
Department of the Army within a period of time which will 
permit paying out the costs allocated to the water supply 
storage within the life of the project. A recreation costsharing 
contract, in accordance with the requirements of 
the Federal Water Project Recreation Act, P.L. 89-72, was 
executed by the State of West Virginia on March 27,1977. 
Local cooperation assurances for recreation cost-sharing 
were executed by the Governor and Attorney General of 
West Virginia on May 29, 1973. In this connection, Section 
8 of P.L. 92-222 deleted the requirement that the State 
of West Virginia "hold and save the United States free 
from damages resulting from water rights claims due to 
construction and operation of the project." Legislation 
relieving Stonewall Jackson Lake, WV, project of the requirements 
of Section 221, P.L. 96-611 was contained in 
Water Resources Development Act of 1974 signed by the 
President on March 7, 1974. 
Operations during fiscal year. New Work: Relocation of 
US Rt. 30, Section 2 contract, awarded September 12, 
1984, progressed to 99% completion. Relocation of US Rt. 
30, Section 3 contract, awarded March 26, 1985 for 
$5,926,755, was completed on November 17, 1986. Contract 
for Relocation of WV Rt. 44 and Associated Routes, 
awarded February 18, 1986 for $4,605,724 progressed to 
88% completion. 
Contract for construction of dam, awarded July 29,1983 
for $15,985,064 was completed on December 19, 1986. 
Construction of Equitable Gas Company Access Roads, 
Phase II, awarded May 31, 1985 for $1,267,138 was completed 
on October 25, 1986. Construction of Equitable Gas 
Company Access Roads, Phase III, awarded March 25, 
1986 for $1,250,662 progressed to 99% completion. Costreimbursable 
contract with Equitable Gas Company for 
Phase II Piping Work was negotiated and awarded on 
March 8, 1985, for an estimated amount of $4,276,808, and 
progressed to 98% completion. 
Contract to Relocate Baltimore and Ohio Railroad 
Track and Appurtenances, awarded June 18, 1985 for 
$3,496,215 was completed on August 31, 1986. Costreimbursable 
contract with Baltimore and Ohio Railroad 
for Track Raise and Communication Lines was negotiated 
and awarded on January 22,1985 for an estimated amount 
of $405,000 and was completed during fiscal year 1987. 
Cost-reimbursable contract with Consolidated Gas 
Transmission Corportion for Relocation, Removal or 
Abandoment and Subordination of Gas Pipelines, Gas 
Production Wells and Access Roads, was negotiated in July 
1984 for an estimated amount of $2,725,000 and was 
completed during fiscal year 1987. 
Roanoake Elementary School construction contract, 
awarded August 1, 1984 for $3,193,000 was completed on 
July 17, 1986. 
Contract for construction of Maintenance Complex, 
Roanoke Bay Recreation Area, awarded June 10, 1986 for 
$1,989,000 progressed to 83% completion. Contract for 
Reservoir Clearing was awarded on September 20, 1986 
for $1,114,000 and was completed on July 6, 1987. Contract 
for fencing cemetaries was awarded on January 20, 
1987 for $54,673 and completed on September 29, 1987. 
Contract for construction of Georgetown Boat Access 
Area was awarded on August 13, 1987 for $329,774. Contract 
for relocation of Mary Conrad House and Roadside 
Park was awarded on August 17, 1987 for $364,955. Contract 
for Carrion Bay and Roanoke Bay Recreation Area 
was awarded on September 17, 1987 for $1,136,825. 
Surface land acquired for the project consists of 20,849 
acres. 
Land acquisition, detailed engineering work and construction 
continued and all items of work were progressing 
on schedule. Estimated flood control benefits achieved 
by this reservoir for the fiscal year were $23,000. Total 
flood control benefits for the reservoir through September 
30, 1987 are $28,578,000. 
24. TIONESTA LAKE, OHIO RIVER 
BASIN, PA 
Location. Dam is on Tionesta Creek, 1.25 miles above 
junction of creek with Allegheny River at Tionesta, PA, 
and about 78 miles northeast of Pittsburgh, PA. Reservoir 
is entirely in Forest County, PA. (See Geological 
Survey Charts for Tionesta, Tidioute and Sheffield, PA.) 
26-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Existing project. A flood control reservoir dam of 
earthfill type with separate uncontrolled saddle spillway 
and tunnel outlet works. Authorized project is complete. 
Reservoir is in operation as a unit of a coordinated reservoir 
system designed for protection of Pittsburgh and 
reduction of flood heights in upper Ohio Valley, generally. 
Construction of dam was started in May 1938 and completed 
in January 1941. Land acquired for project consists 
of 2,797.3 acres in fee and easements over 13.1 acres. 
Future work consists of provision on project lands of additiopal 
recreational facilities as required to serve public 
needs. Project was authorized by Flood Control Acts of 
1936 and 1938. For further project description see Annual 
Report for 1962, page 1203. 
Local cooperation. None required by law. 
Operations during fiscal year. Operation and 
maintenance general: Contract for Miscellaneous Road 
Work was awarded on August 18, 1987 for $319,112. 
Reservoir was operated for benefit of flood control and 
low-flow augmentation, as required, and necessary repairs 
were made to structures and appurtenances. Estimated 
flood control benefits achieved by this reservoir for this 
period were $60,000. Total flood control benefits for this 
reservoir through September 30, 1987 are $171,995,000. 
Activities under reservoir management program comprising 
sanitation measures, conservation, land management 
and operation and maintenance of public-use facilities 
continued. 
25. UNION CITY DAM, PA 
Location. In Erie County, northwestern Pennsylvania, 
on French Creek, a tributary of Allegheny River. Damsite 
is 24 miles upstream from Cambridge Springs, PA, and 
41 miles upstream from Meadville, PA. (See Geological 
Survey Chart for Union City, PA - NY.) 
Existing project. A flood control reservoir dam of earth 
embankment nongated type with uncontrolled sidechannel 
spillway. Outlet works consist of a lower outlet 
located in valley floor constructed of reinforced concrete 
conduit 8 feet by 4.5 feet and an upper outlet consisting 
of an uncontrolled slot 9.5 feet wide through the north end 
of the ogee weir in the spillway. Dam is 1,420 feet long at 
top rising 88 feet above streambed and provides gross 
capacity of 47,640 acre-feet from a drainage area of 222 
square miles. Project authorization was modified to provide 
for a conservation pool and addition of recreation 
facilities. On November 5, 1974, a referendum proposal 
was defeated by the constituents of Erie County in regard 
to the cost-sharing for construction of recreation facilities. 
In view of the foregoing, all action toward implementation 
of the authorized project modification was discontinued. 
Reservoir is operated as one of a two-reservoir system for 
reduction of flood stages in French Creek Basin between 
damsite and mouth, Allegheny River from Franklin, PA, 
to Pittsburgh, PA, inclusive, and upper Ohio River Valley. 
Initial highway relocations were completed in October 
1968 and remaining highway relocations were completed 
in May 1972. Construction of the dam was started in July 
1968 and completed in September 1971. Land acquired for 
project consists of 161.4 acres in fee and easements over 
2,410.3 acres. Existing project was authorized by 1962 
Flood Control Act. 
Local cooperation. Local interests are required to inform 
affected interests in French Creek Basin at least annually, 
that the system of reservoirs of which Union City Dam 
is a part, will not provide protection against maximum 
floods. November 10, 1964 the Department of Forests and 
Waters of the Commonwealth of Pennsyvlania furnished 
formal assurances of local cooperation in respect to notifying 
local interests at least annually that the system of 
reservoirs will not provide protection against maximum 
floods. A referendum on the ballot during the November 
1974 election regarding the approval to cost-share the 
maintenance of a summer pool was defeated by the local 
voters. 
Operations during fiscal year. Operation and 
maintenance, general: Contract for Spillway Repairs was 
awarded on 23 August 1985 and was completed in FY 
1987. Maintenance of the structure and appurtenances 
was performed as required. This dam acted as an uncontrolled 
detention type dam during the fiscal year. 
Estimated flood control benefits achieved by this reservoir 
for this period were $71,000. Total flood control 
benefits for this reservoir through September 30, 1987 are 
$14,490,000. 
26. WOODCOCK CREEK LAKE, PA 
Location. In Crawford County, northwestern Pennsylvania, 
on Woodcock Creek, a tributary of French Creek. 
Damsite is about 4.1 miles above mouth of Woodcock 
Creek and about 5 miles northeast of Meadville, PA. (See 
Geological Survey Chart for Meadville, PA.) 
Existing project. A flood-control reservoir dam of rolledearth 
embankment type, gate-controlled outlet works with 
a 6 foot-wide by 7.75 foot-high conduit and uncontrolled 
saddle spillway on the left abutment. Dam is 4,650 feet 
long at top rising 90 feet above streambed and provides 
for gross capacity of 20,000 acre-feet from a drainage area 
of 46 square miles. Reservoir is operated as one of a tworeservoir 
system for reduction of flood stages in French 
Creek Basin between damsite and mouth. Allegheny River 
from Franklin, PA, to Pittsburgh, PA, inclusive, and upper 
Ohio River Valley. Authorized project is complete. 
Construction of dam was started in July 1970 and completed 
in July 1973. Land acquired for project consists of 
1, 731.5 acres in fee and easements over .56 acres. Project 
was authorized for flood control and recreation by 1962 
Flood Control Act. Storage for water quality control was 
added to the project during the preconstruction planning 
stage. 
Local cooperation. Local interests must inform affected 
interests in French Creek Basin at least annually, in a manner 
satisfactory to District Engineer, that a system of 
reservoirs of which Woodcock Creek is a part, will not provide 
protection against maximum floods. Pennsylvania 
Department of Forests and Waters assumed responsibility 
of local cooperation for project. 
Operations during fiscal year. Operation and 
maintenance, general: Maintenance of the structure and 
appurtenances was performed as required. Estimated 
flood control benefits achieved by this reservoir for this 
26-10

PITTSBURGH, PA., DISTRICT 
period were $3,000; total through September 30, 1987 is 
$1,610,000. 
27. YOUGHIOGHENY RIVER LAKE 
OHIO RIVER BASIN, PA AND MD 
Location. Dam is on Youghiogheny River about 74.2 
miles above its junction with Monongahela River at 
McKeesport, PA. It is 1.2 miles upstream from Confluence, 
PA, and about 57 miles southeast of Pittsburgh, 
PA. Reservoir is in Fayette and Somerset Counties, PA, 
and Garrett County, MD. (See Geological Survey Charts 
for Confluence, PA, Accident, MD, West Virginia and 
Pennsylvania.) 
Existing project. Reservoir for flood control, low-flow 
augmentation, and pollution abatement purposes. Dam 
is rolled-earthfill type with separate uncontrolled side 
channel spillway and tunnel outlet works. Authorized project 
is complete. Reservoir is in operation for flood control, 
low-flow augmentation, and pollution abatement purposes. 
For flood control, reservoir is operated as a unit of 
a coordinated reservoir system designed for protection of 
Pittsburgh and reduction of flood heights in upper Ohio 
Valley, generally. Construction of dam was started in June 
1940 and completed May 1944. Land acquired for project 
consists of 3,914.9 acres in fee and easements over 0.62 
acre. A license was issued Commonwealth of Pennsylvania 
covering fish conservation and management in Pennsylvania 
portion of reservoir. Future work consists of provision 
on project lands of additional recreational and 
sanitary facilities as required to serve the public needs. 
Project was selected for construction under general 
authorization for Ohio River Basin in 1938 Flood Control 
Act. For further project description see Annual Report for 
1962, page 1223. 
Local cooperation. None required. 
Operations during fiscal year. Operation and 
maintenance, general: Contract for Erosion Protection at 
Jockey Hollow was awarded on 29 September 1986 for 
$107,863 and completed during FY 1987. Reservoir was 
operated for benefit of flood control, as required, and 
necessary repairs were made to structures and appurtenances 
as required. Estimated flood control benefits 
achieved by this reservoir for this period were $801,000. 
Total flood control benefits for this dam through 
September 30, 1987 are $151,804,000. Activities under 
reservoir management program comprising sanitation 
measures, conservation, land management, and operation 
and maintenance of public-use facilities were continued. 
28. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Flood Control Act of June 22, 1936, and subsequent acts 
require local interests to furnish assurances that they will 
maintain and operate certain local protection projects 
after completion in accordance with regulations prescribed 
by Secretary of the Army. District Engineers are 
responsible for administration of these regulations within 
boundaries of their respective districts. Inspections were 
made of completed units transferred to local interests for 
maintenance and operation and local interests were advised, 
as necessary, of measures required to maintain these 
projects in accordance with standards prescribed by 
regulations. (See Table 26-M for dates of inspections.) 
Costs for this fiscal year, $43,436. Total cost to 
September 30, 1987 was $1,013,983. 
29. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See Table 26-E on other authorized flood control 
projects. 
30. FLOOD CONTROL WORKS UNDER 
SPECIAL AUTHORIZATION 
For flood control activities pursuant to Section 205, 
Public Law 858, 80th Congress, as amended 
(preauthorization) 
See Table 26-N. 
For emergency bank protection (Sec. 14 of 1946 Flood 
Control Act, Public Law 526, 79th Cong.) 
See Table 26-N. 
Flood control and coastal emergencies (Public Law 99, 
84th Cong., and antecedent legislation.) 
Disaster Preparedness $121,585 
Flood Emergency Operations 54,040 
Rehabilition: 
Buckhannon, WV. 7,428 
Elkins, Randolph County, WV. 45,539 
Pine Creek Flood Protection 
Allegheny County, PA 9,289 
Total Cost for fiscal year: $237,881 
General Investigations 
31. SURVEYS 
Flood control studies $1,223,167 
Review of authorized projects 104 
Coordination with other agencies 35,309 
Special investigations 100,002 
Federal Energy Regulatory Commission 62,824 
Continuation of Planning and Engineering: 
Grays Landing Lock and Dam 
(Lock and Dam 7), Monongahela River, PA. 20,378 
Point Marion Lock and Dam 
(Lock and Dam 8), Monongahela River, PA 
and WV 5,702 
Total cost for fiscal year $1,447,486 
32. COLLECTION AND STUDY OF 
BASIC DATA 
Costs this fiscal year were $179,930 for flood plain 
management services and $12,457 for related hydrologic 
studies. 
33. RESEARCH AND DEVELOPMENT 
None. 
26-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 26-A COST AND FINANCIAL STATEMENT 
See Total Cost to 
Section Sep 30, 
In Text Project Funding FY 84 FY 85 FY 86 FY 87 1987 
Navigation - Locks and Dams 
1. Allegheny River New Work 
PA Approp. 
Cost 
Maint. 
Approp. 
Cost 
3. Monongahela New Work 
River, PA and Approp,. 
WV Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
5. Tygart Lake, New Work 
WV Approp. 
Cost 
Maint. 
Approp. 
Cost 
Flood Control - Local Protection 
7. Allegheny River New Work 
Oil City, PA Approp. 
Cost 
8. Chartiers New Work 
Creek, PA Approp. 
(Federal Funds) Cost 
New Work 
(Contributed Contrib. 
Funds) Cost 
9. Elkins, WV New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
10. Johnstown, PA New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
11. Punxsutawney, New Work 
Ohio River Approp. 
Basin, PA Cost 
Maint. 
Approp. 
Cost. 
3,788,000 3,971,500 4 
3,762,006 4.037,823 4 
8,496,900 
8,375,983 
-120,000 
44,567 
-417,500 
-195,337 
689,500 
700,570 
98,000 
244,784 
26,508 
-,o 
6,000 
4,181 
131,000 
314,450 
-6,000 
263,795 
8,96( 
9,61 
- i 39 
0,000 9 
3,100 10 
1,698 
12 
642,000 
705,320 
69,000 
68,648 
41,764 
8,000 
9,619 
-56,591 
19,281 
1,988 
12,104 
- - 18,157,860' 
- - 18,157,860' 
,975,000 5,985,100 64,321,4622 
,986,772 5,905,479 64,217,8982 
400,000 3,323,000 132,926,0853 
209,436 3,080,973 132,493,4944 
,721,852 11,813,800 157,970,2065 
,063,705 11,727,436 157,771,4866 
- - 15,857,000 
7 221 15,857,000 
- - 19,077,932' 
- - 19,077,932' 
726,400 873,300 9,636,5398 
741,774 846,746 9,585,0398 
120,000 435,000 1,746,000 
95,599 179,474 1,463,441 
- - 26,586,186 
5,134 - 26,560,187 
- - 4,225,188 
- - 4,204,498 
- - 1,772,627 
- - 1,772,627 
3,500 21,000 252,987 
2,838 10,372 241,171 
- - 8,865,3889 
- - 8,865,3889 
7,000 84,000 3,894,205 
7,098 50,417 3,860,422 
- - 3,586,10710 
- - 3,586,10710 
8,000 
8,346 
7,000 1,029,888"1 
2,679 1,025,45911 
Flood Control - Reservoirs 
12. Berlin Lake 
Ohio River 
Basin, OH 
New Work 
Approp.: 
Cost. 
Maint. 
Approp. 
Cost 
-- - - 8,739,98712 
-- - - 8,739,98712 
1,259,000 1,425,500 1,366,700 1,204,900 16,093,88313 
1,025,185 1,610,473 1,397,114 1,238,771 16,061,35513 
26-12

PITTSBURGH, PA., DISTRICT 
TABLE 26-A COST AND FINANCIAL STATEMENT 
(Continued) 
See Total Cost to 
Section Sep 30, 
In Text Project Funding FY 84 FY 85 FY 86 FY 87 1987 
13. Conemaugh 
River Lake, Ohio 
River Basin, PA 
14. Crooked Creek 
Lake, Ohio 
River Basin, PA 
15. East Branch, 
Clarion River 
Lake, Ohio 
River Basin, PA 
16. Kinzua Dam and 
Allegheny 
Reservoir, Ohio 
River Basin, PA 
and NY 
17. Loyalhanna 
Lake, Ohio River 
Basin, PA 
18. Mahoning Creek 
Lake, Ohio 
River Basin, PA 
19. Michael J. Kirwan 
Dam and 
Reservoir, Ohio 
River Basin, OH 
20. Mosquito Creek 
Lake, Ohio River 
Basin, OH 
21. Ohio River Basin 
Pittsburgh, PA 
District 
Consolidated 
22. Shenango River 
Lake, Ohio River 
Basin, PA 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost. 
New Work 
Approp. 
Cost. 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
-4,000 
7,405 
670,100 
460,055 
- - - 46,012,41114 
- - - 46,012,411"14 
742,091 717,000 900,000 8,165,904 
768,355 880,435 763,414 7,998,521 
63,000 - 43,001 - 4.474,52415 
68,849 26,610 - - 4,431,52315 
1,236,200 1,726,000 2,619,000 3,003,400 15,384,32116 
1,186,299 1,713,527 2,701,478 2,775,020 15,105,98816 
- - - - 9,539,58617 
- - - - 9,539,58617 
804,423 452,500 539,482 728,300 7,966,15718 
915,649 586,993 514,479 712,557 7,910,63518 
- - - - 109,309,07619 
1,214 8,286 - - 109,298,20519 
1,203,000 1,065,500 1,083,000 1,137,900 15,633,178 
1,163,944 1,138,420 1,115,419 1,095,568 15,568,514 
2,000,000 5,000 -100,000 -200,000 2,940,000 
1,399,020 229,472 230,032 8,928 2,920,279 
-5,000 - - - 5,727,53120 
411 - - - 5,727,53120 
826,577 940,705 953,700 1,120,000 11,392,25621 
1,001,587 919,272 999,266 1,047,093 11,288,53321 
-190,000 30,160 - - 7,144,97322 
-95,443 30,160 - - 7,138,81425 
584,000 780,500 650,200 909,000 8,287,516 
546,449 803,900 656,660 829,775 8,167,703 
- - - - 47,033 
- - - - 47,033 
- - - - 17,376,09724 
- - - - 17,376,09724 
659,100 580,807 655,500 596,100 7,581,39625 
808,210 768,377 652,378 605,411 7,569,86125 
- - - - 4,253,02926 
- - - - 4,253,02926 
523,000 514,500 683,000 795,900 7,240,764 
531,555 538,675 672,132 815,130 7,220,246 
- - - - 985,19727 
- - - - 985,19727 
- -- 
- -10,500 
1,239,000 2,089,000 
1,270,706 2,117,222 
- - 40,227,20128 
- - 40,209,89428 
2,019,000 2,045,000 18,685,61729 
2,068,686 1,890,645 18,467,37329 
26-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 26-A COST AND FINANCIAL STATEMENT 
(Continued) 
See Total Cost to 
Section Sep 30, 
In Text Project Funding FY 84 FY 85 FY 86 FY 87 1987 
23. Stonewall Jack- New Work 
son Lake, Ohio Approp. 22,300,000 25,300,000 24,106,000 16,913,000 176,629,200 
River Basin, WV Cost 21,414,527 26,553,633 25,450,413 15,713,411 174,868,710 
Maint. 
Approp. - - - 25,500 25,500 
Cost - - - - - 
24. Tionesta Lake, New Work 
Ohio River Approp. 17,000 -17,286 -32,403 - 7,792,3783s0 
Basin, PA Cost 218,519 41,048 - - 7,788,37931 
Maint. 
Approp. 1,025,000 811,000 1,060,000 1,010,500 12,274,45332 
Cost 895,102 1,049,901 1,074,808 951,589 12,178,42832 
25. Union City New Work 
Dam, Ohio Approp. - - - - 14,559,800 
River Basin, PA Cost - - - - 14,559,800 
Maint. 
Approp. 345,000 417,000 512,000 434,900 3,457,568 
Cost 288,948 445,085 528,818 451,946 3,444,639 
26. Woodcock Creek New Work 
Lake, Ohio Approp. 540,000 23,398 5,376 - 20,553,474"3 
River Basin, PA Cost 194,349 392,820 137,846 6,497 20,545,06534 
Maint. 
Approp. 582,900 592,000 749,000 621,800 5,800,07135 
Cost 555,237 613,235 751,253 622,437 5,761,75435 
27. Youghiogheny New Work 
River Lake Approp. 5,000 -6,112 -10,959 - 12,521,16736 
Ohio River Cost 279,125 7,397 2,334 - 12,521,16736 
Basin, PA and Maint. 
MD Approp. 1,229,200 1,253,000 2,602,000 1,722,600 18,254,9873' 
Cost 1,561,741 1,312,586 2,409,684 1,837,361 18,113,30937 
1. Includes $2,453,737 from emergency relief funds and 
$1,250,049 from public works funds. 
2, Includes $64,365 public works acceleration, executive 
funds (1963) and $191,400 provided from the Productive 
Employment Appropriations Act (PL 98-8) 1983 funds. 
3. Includes $5,420,541 for New Work for previous projects, 
$789,000 appropriated to Point Marion, L/D 8, PA in FY 87; 
$2,534,000 appropriated in FY 87 arid a total of $2,934,000 appropriated 
to date for Grays Landing, L/D, PA. 
4. Includes $654,010 expended for Pt. Marion, L/D 8, PA 
in FY 87; $2,426,963 expended in FY 87 and a total of $2,636,399 
expended to date for Grays Landing, L/D 7, PA. 
5. Includes $22,549 public works acceleration, executive 
funds (1963), $742 for maintenance for previous project and 
$582,000 provided from the Productive Employment Appropriations 
Act (PL 98-8) 1983 funds. 
6. Includes $22,549 public works acceleration, executive 
funds (1963), $742 for maintenance for previous project and 
$464,508 provided from the Productive Employment Appropriations 
Act (PL 98-8) 1983 funds. 
7. Includes $1,999,995 emergency relief funds, $10,000,000 
public works funds, $234,000 Code 711 funds and $412,088 Code 
713 funds; excludes $409,622 contributed by local interest. 
8. Includes $89,000 provided from the Productive Employment 
Appropriations, Act (PL 98-8) 1983 funds. 
9. Includes $33,423 from emergency relief funds. 
10. Excludes $180,485 for new work expended from contributed 
funds. 
11. Includes $283,988 provided from the Productive 
Employment Appropriations Act (PL 98-8) 1983 funds. 
12. Includes $1,542,500 Code 711 funds, $809,700 Code 712 
funds and $99,111 Code 713 funds; excludes $100,000 contributed 
by local interest. 
13. Includes $40,000 provided from the Productive Employment 
Appropriations Act (PL 98-8) 1983 funds. 
14. Includes $5,351 from emergency relief funds and 
$328,000 Code 711 funds. 
15. Includes $63,788 from emergency relief funds and 
$269,635 Code 711 funds. 
16. Includes $45,000 provided from the Productive Employment 
Appropriations Act (PL 98-8) 1983 funds. 
17. Includes $156,812 Code 711 funds. 
18. Includes $322,000 provided from the Productive 
Employment Appropriations Act (PL 98-8) 1983 funds. 
19. Includes $2,791 from emergency relief funds, $14,622 
Code 711 funds and $568,265 Code 713 funds; excludes $389,370 
contributed by local interest. 
20. Includes $7,339 from emergency relief funds and 
$274,669 Code 711 funds. 
21. Includes $256,000 provided from the Productive 
Employment Appropriations Act (PL 98-8) 1983 funds. 
22. Includes $25,671 emergency relief funds, $162,381 Code 
711 funds and $561,247 Code 713 funds; excludes$500,086 contributed 
by local interests. 
23. Includes $25,671 emergency relief funds, $162,381 Code 
711 funds and $555,088 Code 713 funds; excludes $456,611 contributed 
by local interests. 
24. Includes $74,900 Code 711 funds; excludes 
$4,423,921.24 for new work contributed by local interest. 
25. Includes $315,500 provided from the Productive 
Employment Appropriations Act (PL 98-8) 1983 funds. 
26. Includes $122,729 Code 711 funds and $94,900 Code 713 
funds. 
27. Includes $8,914 from emergency relief funds. 
28. Includes $1,730,100 Code 711 funds and $1,618,300 
Code 713 funds. 
26-14

PITTSBURGH, PA., DISTRICT 
29. Includes $152,000 provided from the Productive 
Employment Appropriations Act. (PL 98-8) 1983 funds. 
30. Includes $2,303,076 Code 711 funds ($256,760 provided 
from the Productive Employment Appropriations Act PL 98-8, 
1983 funds), $275,900 Code 712 funds, and $24,201 emergency 
relief funds. 
31. Includes $2,299,077 Code 711 funds, ($252,761 provided 
from the Productive Employment Appropriations Act PL 98-8, 
1983 funds), $275,900 Code 712 funds, and $24,201 emergency 
relief funds. 
32. Includes $203,000 provided from the Productive 
Employment Appropriations Act (PL 98-8) 1983 funds. 
33. Includes $1,679,774 Code 711 funds. 
34. Includes $1,671,366 Code 711 funds. 
35. Includes $85,000 provided from the Productive Employment 
Appropriations Act (PL 98-8) 1983 funds). 
36. Includes $2,846,263 Code 711 funds ($293,000 provided 
from the Productive Employment Appropriations Act. (PL 98-8) 
1983 funds). 
37. Includes $591,000 provided from the Productive 
Employment Appropriations Act (PL 98-8) 1983 funds. 
26-15 
TABLE 26-A 
(Continued) 
COST AND FINANCIAL STATEMENT

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 26-B AUTHORIZATION LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
ALLEGHENY RIVER, PA. (See Section 1 of Text) 
Aug 5, 1886 For lock and dam 1. (Fixed dam contemplated. Sep 29, 1891 
Secretary of War authorized change to a movable dam.) 
June 3, 1896 For locks and dams 2 and 3. 
July 25, 1912 For locks and dams 4 to 8 inclusive. 
July 3, 1930 For a depth of 9 feet in the lower 61 miles. 
Aug 30, 1935' 
Aug 30, 1935' 
June 26, 19342 
Replace lock and dam 1 by a dredged channel, 9 feet deep and 
200 feet wide up to lock 2, and construct new locks and 
dams 2 and 3, to replace existing locks and dams 2 and 3. 
Construct lock and dam 9, raising crest of dam 8, and 
dredging a navigable channel to head of pool 8. 
Operation and care of locks and dams provided for with funds 
from War Department appropriation for rivers and harbors. 
MONONGAHELA RIVER, PA AND WV 
Mar 3, 1899 Enlarge and improve lock and dam 6; additional works at 
lock 3; new repair steamer and new dredge boat with 
equipment; all at an estimated cost of $185,556. 
June 13, 1902 Rebuild lock and dam 2 at estimated cost of $655,961. 
(Estimate increased in 1910 to $698,961.) 
Mar 3, 1905 Acquisition of land and additional improvements at 5 and 6 
at a cost of $7,850. 
Mar. 3, 1905 Rebuild lock and dam 3 at estimated cost of $589,196. 
Mar 2, 1907 Reconstruct lock and dam 5 at estimated cost of $756,042. 
Mar 4, 1913 Reconstruct lock and dam 6 at estimated cost of $356,400. 
(Estimate increased in 1916 to $418,860.) 
Sep 22, 1922 Additional improvements at estimated cost as follows: 
Guide walls and guard walls, 1 to 6, $1,255,130; 
Lengthen land chamber of lock 3 to 720 feet, $787,722; 
New chamber (360 feet long), lock 4, $699,786; 
Lock and dam 7, $1,161,241; Lock and dam 8, $1,165,758; 
Lock and dam 7 (second chamber), $419,126; 
Lock and dam 8 (second chamber), $504,465; 
Reconstruct dam 4, $397,211; Marine ways, repair plant, 
office and warehouse, $250,000, for a total of $6,640,439. 
July 3, 1930 Construct new locks and dam 2.5 miles below existing 
structure, at estimated cost of $2,175,000 in lieu of work 
authorized at old lock and dam 4. 
Jan 31, 1931P Chief of Engineers authorized to locate new locks and dam 4 
above existing structure and on such site as they may deem 
most desirable. 
June 26, 19342 Operation and care of locks and dams provided for with funds 
from War Department appropriations for rivers and harbors. 
May 17, 1950 Modification of existing project as follows: 
Provide 2 new locks and dams similar to Morgantown lock 
and dam to replace existing locks and dams 12 to 15 inclusive. 
Provide a movable crest on existing dam 8 to raise existing 
pool-full elevation 4 feet. 
Provide a navigation channel of 300-foot minimum bottom 
width and a 9-foot project depth above lock and dam 8. 
Provide an extension of navigable channel of upper 
Monongahela River, into lower Tygart River for 2.1 miles at a 
maximum bottom width of 200 feet and a 9-foot project depth. 
Annual Report 1886, p. 1545, 
Annual Report 1891, p. 2366 
H. Doc. 204, 54th Cong., 
1st sess., and Annual Report 
1896, p. 2212 
H. Doc. 540, 62d Cong., 
2d sess. 
H. Doc. 356, 71st Cong. 
2d sess. 
Rivers and Harbors 
Committee, Doc. 16, 
72d Cong., 1st sess. 
H. Doc. 721, 71st Cong., 
3d sess., and Rivers and 
Harbors Committee, Doc. 27, 
73d Cong., 2d sess. 
Annual Report 1897, p. 2423 
Annual Report 1909, p. 1756 
Annual Report 1904, p. 460 
H. Doc. 209, 58th Cong., 
2d sess. 
H. Doc. 209, 58th Cong., 
2d sess. 
H. Doc. 1217, 62d Cong., 
3d sess. 
H. Doc. 288, 67th Cong., 
2d sess. 
Rivers and Harbors 
Committee, Doc 22, 
70th Cong., 2d sess. 
S. Doc. 100, 81st Cong., 
1st sess. 
26-16 
1. 
3.

PITTSBURGH, PA., DISTRICT 
TABLE 26-B AUTHORIZATION LEGISLATION 
(Continued) 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
3. Nov. 17, 1986 
5. 
Jan 11, 1934 
Aug 30, 1935 
9. 
Jun 28, 1938 
10. 
Jun 28, 1938 
11. 
Jun 28, 1938 
12. 
Jun 28, 1938 
Dec 22, 1944 
as amended 
13. 
Jun 22, 1936 
amended by 
Jun 28, 1938 
Dec 22, 1944 
as amended 
14. 
Jun 22, 1936 
amended by 
Jun 28, 1938 
Dec 22, 1944 
as amended 
Construct new lock and dam 7 (Grays Landing Lock and Dam) 
as follows: 
The Grays Landing Lock and Dam will be located 3.0 miles 
downriver from existing Lock and Dam 7. It will consist of 
a single lock chamber, 84 feet wide by 720 feet long, with 
a fixed crest dam 576 feet in length. The existing Maxwell 
Pool at elevation 763.0 will be shortened three miles and 
and the existing Pool 7 at elevation 778.0 will be extended 
downriver to the new dam. There will be no change in pool 
elevation above existing Dam 7. Upon completion of the 
new replacement lock and dam, existing Lock and Dam 7 
will be removed. Total estimated cost is $165,000,000. 
Replace existing 56' x 360' lock chamber at Point Marion Lock 
and Dam (Lock and Dam 8) with new 84' x 720' chamber. 
Existing movable crest dam to remain; no change in pool 
elevations. Total estimated cost is $82,900,000. 
TYGART RIVER LAKE, WV 
Construction of a dam and reservoir for low water regulation 
and flood control 
ELKINS, WV 
For construction of local flood protection projects. 
JOHNSTOWN, PA 
For construction of local flood protection projects. 
PUNXSUTAWNEY, OHIO RIVER BASIN, PA 
For construction of local flood protection projects. 
BERLIN LAKE, OHIO RIVER BASIN, OH 
Construction of a dam and reservoir for flood control and low 
water regulation. 
Construction, operation & maintenance of recreation facilities. 
CONEMAUGH RIVER LAKE, OHIO RIVER BASIN, PA 
Construction of adam and reservoir for flood control. 
Construction, operation & maintenance of recreation facilities 
CROOKED CREEK LAKE, OHIO RIVER BASIN, PA 
Construction of a dam and reservoir for flood control. 
Construction, operation & maintenance of recreation facilities. 
Supplemental Appropriations 
Act of 1985 for Engineering 
and Design and Land 
Acquisition and the Water 
Resources Development 
Act of 1986; 
Public Law 99-662 
Sec. 301(a). 
Supplemental Appropriations 
Act of 1985 for Engineering 
and Design and Land 
Acquisition and 
Water Resources Develop 
ment Act of 1986; 
Public Law 99-662 
Sec. 301(a). 
H. Doc. 1792, 64th Cong. 
2nd Sess. 
H. Doc. 106, 76th Cong. 
1st Sess. 
H. Doc. 306, 74th Cong. 
1st Sess. 
FCC Doc. No. 1, 75th Cong. 
1st Sess. 
H. Doc. 306, 74th Cong. 
1st Sess. 
FCC Doc. No. 1, 75th Cong. 
1st Sess. 
H. Doc. 306, 74th Cong. 
1st Sess. 
FCC Doc. No. 1, 75th Cong. 
1st Sess. 
H. Doc. 306, 74th Cong. 
1st Sess. 
FCC Doc. No. 1, 75th Cong. 
1st Sess. 
Sec. 4, Flood Control Act 
of 1944 
H. Doc. 306, 74th Cong. 
1st Sess. 
FCC Doc. No. 1, 75th Cong. 
1st Sess. 
Sec. 4, Flood Control Act 
of 1944 
H. Doc. 306, 74th Cong. 
1st Sess. 
FCC Doc. No. 1, 75th Cong. 
1st Sess. 
Sec. 4, Flood Control Act 
of 1944 
26-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 26-B AUTHORIZATION LEGISLATION 
(Continued) 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Jun 28, 1938 
Dec 22, 1944 
as amended 
Jun 22, 1936 
amended by 
Jun 28, 1938 
modified by 
Aug 18, 1941 
Dec 22, 1944 
as amended 
Jun 22, 1936 
amended by 
Jun 28, 1938 
Dec 22, 1944 
as amended 
Jun 22, 1936 
amended by 
Jun 28, 1938 
Dec. 22, 1944 
as amended 
Jul 3, 1958 
Jul 14, 1960 
Jun 28, 1938 
Dec. 22, 1944 
as amended 
15. 
OHIO RIVER BASIN - Pittsburgh District 
Aug 28, 1937 Construct levees, floodwalls, and drainage structures for 
protection of cities and towns in Ohio River Basin. Projects 
to be selected by Chief of Engineers with approval of 
Secretary of War at a cost not to exceed $24,877,000 for 
construction. 
June 28, 1938 Approved general comprehensive plan for flood control and 
other purposes in Ohio River Basin as may be advisable in 
discretion of Secretary of War and Chief of Engineers, and for 
initiation and partial accomplishment of plan, authorized $75 
million for reservoirs and $50,300,000 for local flood protection 
works. 
Aug 18, 1941 Additional $45 million for prosecution of comprehensive plan 
for Ohio River Basin. 
Dec 22, 1944 Additional $70 million for further prosecution of comprehensive 
plan for Ohio River Basin, including additional projects in 
tributary basins. 
Jul 24, 1946 Additional $125 million for further prosecution of comprehenplan 
including additional projects in tributary basins. 
EAST BRANCH CLARION RIVER LAKE, 
OHIO RIVER BASIN, PA 
Construction of a dam and reservoir for flood control and low 
water regulation. 
Construction, operation & maintenance of recreation facilities. 
KINZUA DAM AND ALLEGHENY RESERVOIR, 
OHIO RIVER BASIN, PA AND NY 
Construction of a dam and reservoir for flood control and low 
water regulation and recreation. 
Construction of a dam and reservoir for flood control, pollution 
abatement, low water regulation and recreation. 
Construction, operation & maintenance of recreation facilities. 
LOYALHANNA LAKE, OHIO RIVER BASIN, PA 
Construction of a dam and reservoir for flood control. 
Construction, operation & maintenance of recreation facilities. 
MAHONING CREEK LAKE, OHIO RIVER BASIN, PA 
Construction of a dam and reservoir for flood control. 
Construction, operation & maintenance of recreation facilities. 
MICHAEL J. KIRWAN DAM AND RESERVOIR, OH 
Construction of a dam and reservoir for flood control, water 
supply, low water, regulation and recreation. 
To define cost-sharing arrangement for municipal & industrial 
water supply & water for pollution abatement purposes. 
MOSQUITO CREEK LAKE, OHIO RIVER BASIN, OH 
Construction of a dam and reservoir for flood control, low 
water regulation and water supply storage. 
Construction, operation & maintenance of recreation facilities. 
26-18 
16. 
H. Doc. 306, 74th Cong. 
1st Sess. 
FCC Doc. No. 1, 75th Cong. 
1st Sess. 
Sec. 4, Flood Control Act 
of 1944 
H. Doc. 306, 74th Cong. 
1st Sess. 
FCC Doc. No. 1, 75th Cong. 
1st Sess. 
H. Doc. 300, 76th Cong. 
1st Sess. 
Sec. 4, Flood Control Act 
of 1944 
H. Doc. 306, 74th Cong. 
1st Sess. 
FCC Doc. No. 1, 75th Cong. 
1st Sess. 
Sec. 4, Flood Control Act 
of 1944 
H. Doc. 306, 74th Cong. 
1st. Sess. 
FCC Doc. No. 1, 75th Cong. 
1st Sess. 
Sec. 4, Flood Control Act 
of 1944 
H. Doc. 191, 85th Cong. 
1st Sess. 
Pub. Law 86-645 
H. Doc. 306, 74th Cong. 
1st. Sess. 
FCC Doc. No. 1, 75th Cong. 
1st Sess. 
Sec. 4, Flood Control Act 
of 1944 
Flood Control Committee, 
Doc. 1, 75th Cong., 1st sess. 
Flood Control Committee, 
Doc. 1, 75th Cong. 1st sess. 
H. Doc. 300, 76th Cong. 
1st Sess. 
H.Doc. 762, 77th Cong. 
2d sess. 
H. Doc. 506, 78th Cong. 
1st sess. 
17. 
18. 
19. 
20. 
21.

PITTSBURGH, PA., DISTRICT 
TABLE 26-B 
(Continued) 
See Date 
Section Authorizing 
in Text Act 
AUTHORIZATION LEGISLATION 
Project and Work Authorized Documents 
Additional $100 million for prosecution of comprehensive plan 
for Ohio River Basin. 
Additional $150 million for further prosecution of 
comprehensive plan for flood control and other purposes in 
Ohio River Basin. 
Additional $89 million for further prosecution of comprehensive 
plan for Ohio River Basin. 
Additional $38 million for further prosecution of comprehensive 
plan for Ohio River Basin. 
Additional $35 million for further prosecution of cmprehensive 
plan for Ohio River Basin. 
Additional $69 million for further prosecution of comprehensive 
plan for Ohio River Basin. 
Additional $120 million for further prosecution of comprehensive 
plan for Ohio River Basin. 
Authorized phase I design memorandum stage of advanced 
engineering and design of the project for abatement of acid 
mine drainage in the Clarion River Basin, Pa. 
S. Doc. 20, 81st Cong. 
1st Ses. 
Public Law 88-253, 
88th Cong., 1st sess. 
H. Doc., 6755, 89th Cong., 
90th Cong. 1st sess. 
Public Law 90-17. 
90th Cong., 1st sess. 
Public Law 90-483, 
90th Cong., 2d sess. 
H. Doc. 15166, 91st Cong., 
2d sess. 
H. Doc. 10203, 93rd Cong. 
River Basin Monetary 
Authorization Act of 1974. 
Water Resources Development 
Act of1976; Public Law 
94-587, Sec. 101(a). 
May 17, 1950 
Dec 30, 1963 
Jun 18, 1965 
May 12, 1967 
Aug 13, 1968 
Jun 19, 1970 
Mar. 7, 1974 
Oct. 22, 1976 
Jun 28, 1938 
Dec 22, 1944 
as amended 
STONEWALL JACKSON LAKE, WV 
Nov 7, 1966 Construction of a dam and reservoir for flood control, water 
supply, water quality control, area redevelopment and 
recreation. 
Jun 22, 1936 
amended by 
Jun 28, 1938 
Dec 22, 1944 
as amended 
Oct. 23, 1962 
TIONESTA LAKE, OHIO RIVER BASIN, PA 
Construction of a dam and reservoir for flood control and low 
water regulation. 
Construction, operation & maintenance of recreation facilities. 
UNION CITY DAM, PA 
Construction of a dam and reservoir for flood control. 
WOODCOCK CREEK LAKE, PA 
Oct 23, 1962 Construction of a dam and reservoir for flood control, 
recreation and storage for water quality control. 
Jun 28, 1938 
Dec. 22, 1944 
as amended 
YOUGHIOGHENY RIVER LAKE, OHIO RIVER BASIN, 
PA AND MD 
Construction of a dam and reservoir for flood control, low-flow 
augmentation, and pollution abatement, purposes. 
Construction, operation & maintenance of recreation facilities. 
S. Doc. 109, 89th Cong. 
2nd Sess. 
H. Doc. 306, 74th Cong. 
1st Sess. 
FCC Doc. No. 1, 75th Cong. 
1st Sess. 
Sec. 4, Flood Control Act 
of 1944 
S. Doc. 95, 87th Cong. 
2nd Sess. 
S. Doc. 95, 87th Cong. 
2nd Sess. 
H. Doc. 306, 74th Cong 
1st Sess. 
FCC Doc. No. 1, 75th Cong. 
1st Sess. 
Sec. 4, Flood Control Act 
of 1944 
1. Included in the Emergency Relief program 
April 8, 1935. 
2. Permanent Appropriations Repeal Act. 
3. Public Res. 117, 71st. Cong., 3d Sess. 
26-19 
SHENANGO RIVER LAKE, OHIO RIVER BASIN, PA AND OH 
Construction of a dam and reservoir for flood control, low water H. Doc. 306, 74th Cong. 
regulation and recreation. 1st Sess. 
FCC Doc. No. 1, 75th Cong. 
1st Sess. 
Construction, operation & maintenance of recreation facilities. Sec. 4, Flood Control Act 
of 1944 
22. 
23. 
24. 
25. 
26. 
27. 
I - - -' - ' ---- ' - - 
- I ~ -- 
- -- =ms s. I .. �,.ll~~ll --

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 26-C OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 6 of Text) 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Allegheny River, PA, open-channel work Completed 1934 197,000 133,940 
Beaver and Mahoning Rivers, PA and 
OH 1 4 Inactive 1938 - - 
Buckhannon River, WV 2 3 Completed 1893 5,500 - 
Cheat River, WV2 3 Completed 1895 12,997 - 
Pittsburgh Harbor, PA Completed 1922 110,663 81,613 
1. January 23, 1939, Chief of Engineers recommended 
constructing a waterway from Ohio River through Beaver, 
Mahoning, and Grand River Valleys to Lake Erie (H. Doc. 
178, 76th Cong., 1st Sess.) 
2. Abandonment recommended in H. Doc. 467, 69th 
Cong., 1st Sess. 
3. No Commerce reported. 
4. Eligible for deauthorization. 
26-20

PITTSBURGH, PA., DISTRICT 
TABLE 26-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(All Projects Not Specifically Identified in Text) 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Amsterdam, OH' 
Benwood, WV2 
Big Run, PA' 
Black Fork at Hendricks, WVI ' 
Bradford, PA 
Brookville, PA 
Buckhannon, WV 
Burgettstown, PA' 
Butler, PA 
DuBois, PA 
Eagle Creek Reservoir, OH2 
Friendsville, MD' 
Girty's Run, Millvale, PA'5 
Granville, PA' 
Johnsonburg, PA 
Kittanning, PA, part I 
Latrobe, PA 
Latrobe, PA 
Leetonia, OH' 
Oakdale, PA' 
Oil City, PA' 
Olean, NY 
Portage, PA 
Portville, NY 
Reynoldsville, PA 
Ridgway, PA (Elk Creek) 
Ridgway and vicinity, PA (on Clarion River)' 4 
Root Creek, Bolivar, NY 
Rouseville, PA' 
Rowlesburg Lake, WV3 
Salamanca, NY 
Slovan, PA' 
Sykesville, PA' 
Tarentum, PA' 
Tenmile Creek at Marianna, PA' 
Turtle Creek, PA6 
Uniontown, PA2 
Wallace, WV' g 
Washington, PA 
Wellsville, OH, Sec. I 
Wellsville, OH, Sec. II 
Weston Mills, Olean, NY' ' 
Weston Mills, Portville, NY' 4 
Wilmore, PA' 
Youngstown, OH 
Completed 
Deferred 
Completed 
Inactive 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Inactive 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Inactive 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Active 
Completed 
Inactive 
Active 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Inactive 
Inactive 
Completed 
Completed 
Completed 
Active 
Active 
Completed 
Completed 
1964 
1954 
1965 
1972 
1962 
1963 
1972 
1970 
1979 
1986 
1958 
1949 
1951 
1970 
1954 
1965 
1954 
1959 
1964 
1979 
1986 
1977 
1972 
1964 
1981 
1972 
1956 
1964 
1956 
1956 
1976 
183,072 
81,028 
364,208 
6,800 
7,601,763 
964,976 
1,568,661 
83,129 
1,556,181 
4,465,200 
100,000 
41,529 
2,648,849 
75,908 
674,664 
130,317 
207,659 
2,556,652 
89,299 
14,127 
43,595 
3,217,531 
150,386 
2,070,484 
385,494 
628,888 
132,464 
1,591,436 
1,642 
2,857,575 
2,880,535 
57,811 
184,246 
136,591 
1,554,428 
15,387,542 
11,035 
789,093 
483,910 
157,633 
50,100 
52,100 
96,853 
3,621,134 
1. Authorized by Chief of Engineers. 
2. Eligible for deauthorization. 
3. Lacks local support. 
4. 
5. 
6. 
No longer economically justified. 
Excludes $701,722 contributed by local interests. 
Includes $15,350,352 original construction cost. 
26-21 
'e I I 'I

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 26-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report For Deauthorized Expended Expended 
Adena, OH (Short Creek) 
Allegany, NY Unit I (Allegheny River)' 
Allegany, NY Unit II (Five Mile Creek Area)' 
Bellaire, OH 
Brackenridge. Tarentum and Natrona. PA' 
Brilliant, OH 
Brockway, PA (Allegheny River Basin) 
Clarington, OH 
Coraopolis, PA 
Dillonvale, OH (Short Creek) 
Empire-Stratton, OH' 
Follansbee, WV 
Freeport, PA (Allegheny River) 
Industry, PA 
Kittanning, PA, part II (Allegheny River) 
Lake Chautauqua and Chadakoin River, NY2 
Lake Erie-Ohio Canal, OH and PA 
Leetsdale, PA' 
Martins Ferry, OH' 
McKees Rocks, PA 
Mingo Junction, OH 
Moundsville, WV' 
Muddy Creek Dam, PA' 
Neville Island, PA' 
New Cumberland, WV 
New Kensington and Parnassus, PA' 
Pittsburgh, PA (Golden Triangle) 
Pittsburgh, PA (North Side) 
Pittsburgh, PA (The Strip) 
Powhaten Point, OH' 
Proctor, WV' 
Redbank Creek Lake, Pa 
Rochester, PA' 
St. Marys, PA (Allegheny River Basin) 
Smith Ferry, PA 
Warwood, WV' 
Wellsburg, WV 
West Bridgewater, PA 
Wheeling, WV' 
Wheeling, WV (North Wheeling)' 
Wheeling, WV (Wheeling Island)' 
Wilcox, PA'3 
Youghiogheny River, PA and Md (Canalization)' 4 
1975 
1965 
1972 
1941 
1977 
1954 
1971 
Aug 5, 1977 
Nov 17, 1986 
Nov 17, 1986 
May 6, 1981 
Nov 17, 1986 
Aug 5, 1977 
Aug 5, 1977 
Aug 5, 1977 
Aug 5, 1977 
Aug 5, 1977 
Nov 17, 1986 
Aug 5, 1977 
Aug 5, 1977 
Aug 5, 1977 
Nov 6, 1977 
Mar 2, 1970 
May 6, 1981 
Nov 17, 1986 
Nov 17, 1986 
Oct 3, 1978 
Aug 5, 1977 
Nov 17, 1986 
Nov 17, 1986 
Nov 17, 1986 
Aug 5, 1977 
Nov 17, 1986 
Oct. 3, 1978 
Oct. 3, 1978 
Oct 3, 1978 
Nov 17, 1986 
Nov 17, 1986 
Aug 5, 1977 
Nov 17, 1986 
Aug 5, 1977 
Aug 5, 1977 
Nov 17, 1986 
Aug 5, 1977 
Aug 5, 1977 
Nov 17, 1986 
Nov 17, 1986 
Nov 17, 1986 
Mar 5, 1955 
Nov 17, 1986 
1. Deauthorized under Water Resources Development 
Act of 1986 (PL 99-662). 
2. Local Interests failed to meet requirements of 
cooperation, authority for project expired Mar. 2, 1970. 
3. Local interests failed to meet requirements of 
cooperation, authority for project expired Mar. 5, 
1955. 
4. Includes $47,195 construction costs expended 
under previous project and $1,700 O&M costs 
expended under previous project. 
26-22 
13,452 
4,100 
64,851 
76,487 
194 
16,884 
33,031 
190,722 
1,342,000 
25,164 
402,459 
156,377 
13,529 
6,387 
189,067 
21,700 
16,761 
' ' 232,863

ALLEGHENY RIVER, PA.: LOCKS AND DAMS 
(See Section 1 of Text) 
Dimensions 
Upper 
Avail- Normal Depths on Miter 
Width able Lift at Pool Sills at Normal Character of 
of Length Normal Elevation Pool Level- Foundation 
Miles Cham- to Full Pool (feet, 
Above ber Width Level mean sea Lower Upper 
No. Mouth Nearest Town (feet) (feet) (feet) level) (feet) (feet) Lock Dam 
Type of Year 
Construction Per- Opened 
cent to 
Kind of Corn- Nay- 
Dam Lock Dam plete gation Actual Cost 
2 6.7 Aspinwall, PA 56 
3 14.5 Cheswick, PA 56 
4 24.2 Natrona, PA 56 
5 30.4 Freeport, PA 56 
6 36.3 Clinton, PA 56 
7 45.7 Kittanning, PA 56 
8 52.6 Templeton, PA 56 
9 62.2 Rimer, PA 56 
Total 
Abandoned lock and dam 1 
Abandoned lock and dam 2 
Abandoned lock and dam 3 
Demolishing old dam 1 
Dredging channel 
Total 
360 11.0 
360 13.5 
360 10.5 
360 11.8 
360 12.2 
360 13.1 
721.0 
734.5 
745.0 
756.8 
769.0 
782.1 
360 17.9 800.0 
360 22.0 822.0 
12.0 
10.8 
10.0 
10.5 
10.6 
9.8 
10.9 Rock Rock Fixed Concrete Concrete 100 19342 $ 1,763,485 
11.8 Rock Pile-Rock Fixed Concrete Concrete 100 19342 $1,875,665 
8.5 Rock Rock Fixed Concrete Concrete 100 1927 1.707,690 
10.3 Piling Crib-Pile Fixed Concrete Concrete 100 1927 1,940,537 
10.8 Rock Crib-Pile Fixed Concrete Concrete 100 1928 1,523,959 
10.9 Piling Steel Sheet Fixed Concrete Concrete 100 1930 1,460,008 
Piling 
10.4 13.8 Rock Rock 
10.5 11.3 Rock Rock 
Fixed Concrete Concrete 100 1931 2,848,920 
Fixed Concrete Concrete 100 1938 2,510,373 
$15,630,637 
591,187 
544,929 
310,103 
26,001 
1,055,003 
$18,157,860 
1. All depths as shown are on guard sills and 
are controlling depth. 
2. Dates shown represent replacement structures. 
TABLE 26-H
_ I _ _ 
_

TABLE 26-I MONONGAHELA RIVER, PA. AND W. VA.: LOCKS AND DAMS 
(See Section 3 of Text) 
Dimensions 
Upper 
Avail- Normal Depths on Miter 
Width able Lift at Pool Sills at Normal Character of Type of Year 
of Length Normal Elevation Pool Level- Foundation Construction Per- Opened 
Miles Cham- to Full Pool (feet, cent to 
Above ber Width Level mean sea Lower Upper Kind of Corn- Navi- 
No. Mouth Nearest Town (feet) (feet) (feet) level) (feet) (feet) Lock Dam Dam Lock Dam plete gation Actual Cost 
2 11.2 Braddock, PA 56 360 8.7 718.7 16.0 15.95 Rock Crib Pile Fixed Concrete Concrete 100 19532 $17,872,212 ' 
110 720 
3 23.8 Elizabeth, PA 56* 360 8.2 726.9 16.0 15.95 Rock Crib Pile Fixed Concrete Concrete 100 1953 15,538,536 
720 
4 41.5 Monessen, PA 56' 360 16.6 743.5 10.7 20.0 Piles Piles Movable Concrete Concrete 100 19322 17,254,071 
720 
- 61.2 Maxwell locks and dam, 84' 720 19.5 763.0 15.0 20.5 Rock Rock Movable Concrete Concrete 100 1964 30,110,889 
Maxwell, PA 
- 82.2 Grays Landing Lock 84 720 15.0 778.0 15.0 26.0 Rock Rock Fixed Concrete Concrete - - 3,439,399' 
and dam, Grays 
Landing, PA 
87 9805..80 Greensboro, PA 56 360 15.0 778.0 10.0 10.5 Rock Rock Fixed Concrete Concrete 100 19252 2,639,804' Point Marion, PA 56 360 19.0 797.0 10.0 14.5 Rock Rock Movable Concrete Concrete 100 19252 6,681,263 
- 102.0 Morgantown lock and 84 600 17.0 814.0 14.5 17.8 Rock Rock Movable Concrete Concrete 100 1950 8,778,000' 
dam, Morgantown, 
WV 
- 108.0 Hildebrand lock and 84 600 21.0 835.0 15.0 14.0 Rock Rock Movable Concrete Concrete 100 1959 12,506,829 
dam, 6 miles above 
Morgantown, WV 
115.4 Opekiska lock and dam, 84 600 22.0 857.0 14.0 17.75 Rock Rock Movable Concrete Concrete 100 1964 25,179,622 
13.4 miles above 
Morgantown, WV 
Marine ways, etc 250,0005 
Abandoned lock and dam 1 1,019,9076 
Abandoned lock and dam 4 780,8166 
Abandoned lock and dam 5 1,074,8126 
Abandoned lock and dam 6 770,4496 
Abandoned lock and dam 7 213,7766 
Abandoned lock and dam 8 245,9005 
Abandoned lock and dam 9 191,0006 
Abandoned lock and dam 10 210,4456 
Abandoned lock and dam 11227,6686 
Abandoned lock and dam 12 200,5506 
Abandoned lock and dam 13190,6916 
Abandoned lock and dam 14 210,1276 
Abandoned lock and dam 15175,8296 
Dredging587,8996 
Total148,350,4946 
1. All depths as shown are on guard sills and are controlling depths. 
2. Dates shown for locks and dams No. 2 to 8 inclusive, represent 
reconstruction. 
3. 2 Chambers 
4. Includes $3,322,057 for raising crest of dam, (1958-9), $2,086,438 
for original reconstruction (1923-1926) and $618,758 AE&D costs for 
replacement of lock. 
5. Actual cost: may include estimated costs which have been footnoted 
as necessary. 
6. Includes $2,173,767 for original reconstruction (1931-2), and 
$15,080,304 for reconstruction of dam (1963-1967). 
7. Includes $16,967,114 for reconstruction of locks. 
8. Includes $15,857,000 for major rehabilitation. 
9. Includes AE&D costs for proposed lock ($803,000). 
I
0a
0
0A 
'I, 
0O 
I

PITTSBURGH, PA., DISTRICT 
TABLE 26-J MONONGAHELA RIVER, PA AND WV: 
TOTAL COSTS OF EXISTING PROJECT TO END OF FISCAL YEAR 
(See Section 3 of Text) 
Operation and 
Maintenance, 
Funds New Work General Total 
Regular $142,929,95313 $136,848,9852 $279,778,938' 2 3 
Maintenance and operation 452,623 452,623 
Public Works acceleration, executive (1963) - 22,549 22,549 
Total $142,929,953' 3 $137,324,1272 $280,254,110' 2 3 
1. Excludes $5,420,541 for new work for previous projects. 3. Includes $15,857,000 for major rehabilitation of 
L/D 3, $2,636,399 for replacement of L/D 7 and $654,010 
2. Excludes $20,446,587 expended between July 7, 1987 for Point Marion L/D (replacement of lock). 
and June 30, 1937, on operation and care of works of 
improvement under provisions of permanent appropriation 
for such purposes and excludes $742 for maintenance of 
previous projects. 
TABLE 26-K OHIO RIVER BASIN (PITTSBURGH DISTRICT): 
LOCAL PROTECTION PROJECTS 
(See Section 21 of Text) 
Estimated Cost s 
Type of 
Location' Protection Federal Non-Federal Total 
Benwood, WV2 
6 9 Wall 8,500,000 3,180,000 11,680,000' 
Elkins, W V (Monongahela River Basin)4 5 Channel diversion 1,772,6273 40,000 1,812,627 
Johnsonburg, PA (Allegheny River Basin)2 
5 Wall 674,6643 130,000 804,664 
Johnstown, PA (Allegheny River Basin)2 
5 Channel 8,865,3883 - 8,865,3883 
Kittanning, PA, part I (Allegheny River)2 
5 Wall 130,3173 2,000 132,317 
Latrobe, PA (Allegheny River Basin)2 5 Channel 207,6593 44,400 252,059 
Olean, NY (Allegheny River)2 5 Levee 3,217,5313 597,000 3,814,531 
Portville, NY (Allegheny River)2 5 Levee 2,070,4843 353,000 2,423,484 
Punxsutawney, PA (Allegheny River Basin)4 5 Channel and levee 3,586,1073 180,4853 3,766,5923 
Ridgway, PA (Allegheny River Basin)2 
5 Channel 628,8883 72,000 700,888 
Uniontown, PA (Monongahela River Basin)2 9 Channel and wall 5,820,000 980,000 6,800,0008 
Wellsville, OH, sec I2 5 Wall and levee 483,9103 113,000 596,910 
Wellsville, OH, sec. II2 5 Wall and levee 157,6333 - 157,6333 
1. All projects are on the Ohio River unless otherwise 
noted. 
2. Also see "Other authorized flood control projects." 
3. Actual Cost. 
4. Reported in detail in an individual report. 
5. Completed. 
6. Reported in detail in Annual Report for 1954. 
7. Latest cost estimate revision 1960. 
8. Latest cost estimate revision 1977. 
9. Eligible for deauthorization. 
26-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 26-L OHIO RIVER BASIN (PITTSBURGH DISTRICT): RESERVOIRS 
(See Section 21 of Text) 
Total 
Estimated 
Tributary Basin and Reservoir Stream Cost 
Allegheny: 
Conemaugh River, PA' Conemaugh River $ 46,012,411 3 
Crooked Creek, PA' Crooked Creek 4,431,523 3 
East Branch Clarion River, PA' Clarion River 9,539,586 ' 3 
Kinzua Dam and Allegheny Reservoir, PA and NY' Allegheny River 112,218,484 1 36 
Loyalhanna, PA' Loyalhanna Creek 5,727,531 ' 3 
Mahoning Creek, PA' Mahoning Creek 7,138,814 1 3 
Tionesta, PA' Tionesta Creek 7,788,379 ' 3 
Union City, PA' French Creek 14,559,800' 3 
Woodcock Creek, PA' Woodcock Creek 20,545,065 ' 3 
Beaver: 
Berlin, OH' Mahoning River 8,739,987 ' 3 
Eagle Creek, OH 2 Eagle Creek 12,700,000 2 4 7 8 
Michael J. Kirwan, OH' Mahoning River 17,376,097 ' 3 
Mosquito Creek, OH' Mosquito Creek 4,253,029 3 
Shenango River, PA and OH' Shenango River 40,209,894 ' 3 
Monongahela: 
Stonewall Jackson Lake, WV' West Fork River 212,000,000 ' 
Youghiogheny River, PA and MD' Youghiogheny River 12,521,168 ' " 
1. Reported in detail in an individual report. 5. Latest cost estimate revision in 1987. 
2. Also see "Other authorized flood control projects." 6. Includes $2,920,279 actual cost for Dam Rehabilitation. 
3. Actual Cost. 7. Inactive. 
4. Latest cost estimate revision 1954. 8. Eligible for deauthorization. 
TABLE 26-M INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 28 of Text) 
Project Dates of Inspection Project Dates of Inspection 
Amsterdam, Oh October 1985 Leetonia, Oh October 1986 
Big Run, PA March 1987 Marianna, PA June 1986 
Bobvar, NY September 1987 Millvale, PA June 1986 
Bradford, PA July 1987 Oil City, PA May 1987 
Brookville, PA October 1986 Olean, NY September 1987 
Buckhannon, WV September 1986 Portage, PA August 1982 
Burgettstown-Slovan, PA September 1986 Portville, NY September 1987 
Butler, PA July 1987 Reynoldsville, PA March 1987 
Chartiers Creek, PA Ridgway, PA December 1986 
Cannonsburg-Houston Reach September 1986 Salamanca, NY September 1987 
James G. Fulton Reach July 1987 Stonewood-Nutter Fort, WV July 1983 
Colliers, WV October 1982 Sykesville, PA March 1987 
DuBois, PA March 1987 Tarentum, PA November 1976 
Eldred, PA April 1987 Turtle Creek, PA September 1987 
Friendsville, MD March 1987 Washington, PA September 1986 
Granville, PA September 1986 Wellsville, OH November 1987 
Johnsonburg, PA December 1986 Weston, WV May 1987 
Kittanning, PA August 1983 Wilmore, PA August 1982 
Latrobe, PA July 1984 Youngstown, PA November 1986 
26-26

PITTSBURGH, PA., DISTRICT 
TABLE 26-N FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
(See Section 30 of Text) 
Flood Control Activities pursuant to Section 205, 
Public Law 858, 80th Congress, as amended (preauthorization) 
Project Study Identification Fiscal Year Costs 
Allegheny River, Oil City, PA (Construction) $ 179,474 
Parsons, Hambleton, Hendricks, WV 50,492 
West Little Pine Creek, Etna, PA (Construction) 1,871.996 
Total Cost for current fiscal year: $2,101,962 
Emergency Bank Protection - Section 14 of the 
1946 Flood Control Act, Public Law 526, 79th Congress 
Project/Study Identification 
Airport, Glendale, WV (Post Authorization Project Definition Study) 
Beaver River, Bridgewater, PA (Complete) 
Brook County, Hooverson Heights (Complete) 
Brush Creek, Jeannette, PA (Reconnaissance Report) 
Cox Run, Wellsburg, WV (Post Authorization Project Definition Study) 
Crows Run, Conway, PA (Tabled) 
Dry Brook Creek, Poland, NY (Reconnaissance Report) 
Dutch Hollow, Ellery, NY (To be Eliminated) 
Elks Creek, Clarksburg, WV (Complete) 
Kennedy Twp. and McKees Rocks Borough, PA (Complete) 
Mahoning River, Hwy 139A, Trumbull County, OH (Complete) 
Mahoning River, Warren Twp., OH (Complete) 
Main Street, Wellsburg, WV (Post Authorization Project Definition Study) 
Martin's Ferry, WV (To be Eliminated) 
Middle School, Wellsburg, WV (Post Authorization Project Definition Study) 
Monongahela River, Granville, WV (Complete) 
Neshannock Creek, New Castle, PA (Reconnaissance Report) 
North Scenic Rd., Buffalo Twp., PA (Tabled) 
Ohio River, Chester, WV (Complete) 
Ohio River, River Ave., Chester, WV (Tabled) 
Salamanca (Power Transmission Tower), NY (Reconnaissance Report) 
Sewer Outfall, Glendale, WV (Post Authorization Project Definition Study) 
Shupe Run, Mt. Pleasant, PA (Detailed Project report) 
South Scenic Rd., Buffalo Twp., PA (Tabled) 
Turkey Run, Shenango Twp., PA (To be Eliminated) 
Unnamed Tributary to Pymatuning (Reconnaissance Report) 
Water Works, Park and Pool, Wellsburg, WV (Post Authorization Project Definition Study 
West Run, Munhall, PA (Detailed Project Report) 
Yorkville, OH (To be Eliminated) 
Total cost for current fiscal year: 
Fiscal Year Costs 
$ 2,731 
203,759 
143,035 
7,285 
2,109 
4,762 
7,826 
6,564 
82,020 
244,045 
564 
98,081 
1,838 
5,000 
2,229 
191,061 
11,150 
8,536 
99 
9,849 
7,492 
875 
16,766 
9,532 
1,728 
15,807 
4,081 
12,125 
2,230 
$1,103,179 
26-27

ST. PAUL, MN DISTRICT * 
District comprises western Wisconsin, major portion 
of Minnesota, northern and eastern North Dakota, and 
small portions of northeastern South Dakota and northern 
and northeastern Iowa embracing drainage basins of 
Mississippi River and tributaries from its source to mile 
614 above mouth of Ohio River; Red River of the 
North and tributaries; those streams north of Missouri 
River Basin in North Dakota; and U.S. waters of Lake of 
the Woods and its tributaries. That section of Mississippi 
River above mile 614 is included in report on 
Mississippi River between Missouri River and Minneapolis, 
Minnesota. 
IMPROVEMENTS 
Navigation Page 
1. Minnesota River, MN ......................... 27-2 
2. Mississippi River between Missouri River 
and Minneapolis, MN ......................... 27-2 
3. Reservoirs at Headwaters of 
Mississippi River, MN......................... 27-2 
4. Warroad Harbor and River, MN ............... 27-2 
5. Zippel Bay, Lake of the Woods 
County, MN ......................................... 27-3 
Flood Control 
6. Bassett Creek, MN ............................ 27-3 
7. Big Stone Lake and Whetstone 
River, MN and SD ................................. 27-3 
8. Black Bear and Miller Lakes, 
Crow Wing County, MN ...................... 27-4 
9. Chaska, MN.................... .................. 27-4 
10. Devils Lake, ND ............................... 27-5 
11. Eau Galle River, WI ........................... 27-5 
12. Enderlin, Maple River, ND ................... 27-5 
13. Hanover, Hennepin County, MN.............. 27-6 
14. Homme Lake and Dam, ND .................... 27-6 
15. Kickapoo River, Gays Mills, WI............... 27-6 
16. Lac qui Parle Lake, Minnesota River, MN.... 27-7 
17. La Farge Lake and channel 
improvement, WI .............................. 27-7 
18. Lake Ashtabula and Baldhill Dam, 
Sheyenne River, ND ......................... 27-7 
19. Lake Darling, Souris River, ND ............. 27-8 
20. Lake Pulaski, Wright County, MN .......... 27-8 
21. Lake Traverse and Bois de Soiux 
River, SD and MN ............................. 27-9 
22. Mankato and North Mankato, MN ............ 27-9 
23. Middle River at Argyle, MN ................. 27-9 
24. Prairie du Chien, WI.......................... 27-9 
25. Red Lake River, MN, including 
Clearwater River, MN ......................... 27-10 
26. Red River of the North at Argusville, ND .... 27-10 
27. Red River of the North drainage basin, 
MN, SD & ND .................................. 27-10 
28. Redwood River at Marshall, MN.............. 27-11 
29. Rochester, MN ................................. 27-11 
30. Root River at Houston, MN ................... 27-12 
31. Roseau River, MN ............................. 27-12 
Page 
32. Sheyenne River, ND ......................... 27-12 
33. Sheyenne River, Valley City, ND............. 27-13 
34. Souris River, Velva, ND ........................ 27-13 
35. State Road and Ebner Coulees, WI..........27-13 
36. Twin Valley Lake, Wild Rice River, MN ...... 27-14 
37. Warner Road, Mississippi River, 
St. Paul, M N ..................................... 27-14 
38. Wild Rice River, South Branch 
and Felton Ditch, MN......................... 27-15 
39. Winona, MN.................................. 27-15 
40. Inspection of completed flood 
control projects.................. ............... 27-15 
Miscellaneous 
41. Other work under special authority......... 27-16 
General Investigations 
42. Surveys ...................................... 27-1 
43. Collection and study of basic data........... 27-16 
44. Continuation of planning and engineering... 27-16 
45. Advance engineering and design ............ 27-16 
Tables 
Table 27-A Cost & Financial Statement ........ 27-17 
Table 27-B Authorizing Legislation ............. 27-20 
Table 27-C Other Authorized 
Navigation Projects ................ 27-21 
Table 27-D Not Applicable 
Table 27-E Other Authorized Flood 
Control Projects ...................... 27-22 
Table 27-F Not Applicable 
Table 27-G Deauthorized Projects ............... 27-23 
Table 27-H Reservoirs at Headwaters of 
Mississippi River ..................... 27-24 
Table 27-I Red River of the North 
Drainage Basin: Active Units 
in Comprehensive Basin 
Plan.................................. 27-25 
Table 27-J Inspection of Completed Flood 
Control Projects ...................... 27-26 
Table 27-K Flood Control Work Under 
Special Authorization.................. 27-27 
Table 27-L General Investigations .............. 27-29 
27-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. MINNESOTA RIVER, MN 
Location. Rises in Big Stone Lake, MN and SD, and 
flows southeasterly about 224 miles to Mankato, MN, 
thence northeasterly about 106 miles to join the Mississippi 
River opposite St. Paul, MN. (For general location 
see Geological Survey map of Minnesota.) 
Previous projects. For details see page 1890 of Annual 
Report for 1915, and page 1105 of Annual Report 
for 1938. 
Existing project. Provides 9-foot depth below flat 
pool level of Mississippi River lock and dam 2 from 
mouth to mile 14.7, one-half mile above the railway 
bridge at Savage, MN, and 4-foot depth from mile 14.7 to 
25.6 at Shakopee, MN. For details see page 1018 of 
Annual Report for 1965. (See table 27-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. See also 
page 1074 of Annual Report for 1967. 
Terminal facilities. There are privately-owned terminals 
at miles 9, 13.1, 14.5, and two at mile 14.7. 
Operations and results during fiscal year. Maintenance: 
Dredging by contract cost $94,775 and by hired 
labor, $111,830. Snagging and clearing cost $57,703 by 
hired labor. Engineering and administrative costs 
amounted to $18,599. 
Condition at end of fiscal year: Work on project for 
4-foot depth was completed in 1931. The United States 
owns 10 acres of land in fee 2 miles east of Savage, MN, 
and easements on 123.08 acres of land. 46.20 acres have 
been transferred from the Department of the Army and 
Department of the Air Force to the project. Navigation 
from mouth to Shakopee was practicable for drafts not in 
excess of 3 feet. A contract for work under 1958 authorization 
for a 9-foot channel started in May 1966 was 
terminated in January 1967 when 56 percent complete. 
A channel dredging contract awarded in June 1967 was 
completed in August 1968. Total costs for existing 
project to September 30, 1987, were $4,500,973, of which 
$1,940,180 was for new work and $2,560,793 for maintenance. 
In addition, cost from contributed funds was 
$139,671 for dredging to 9-foot depth under provisions of 
section 4, River and Harbor Act of 1915, and $219,531 
for work done for the State of Minnesota relative to 
modification of the project. 
2. MISSISSIPPI RIVER BETWEEN 
MISSOURI RIVER AND 
MINNEAPOLIS, MN 
For report on this improvement see chapter on Mississippi 
River between Missouri River and Minneapolis, 
Minnesota. 
3. RESERVOIRS AT HEADWATERS OF 
MISSISSIPPI RIVER, MN 
Location. Reservoirs are on the Mississippi River and 
several of its tributaries in Itasca, Beltrami, Hubbard, 
Aitkin, Cass and Crow Wing Counties, MN. (See table 
27-H on reservoirs.) 
Previous projects. For details see page 1888 of Annual 
Report for 1915, and page 1098 of Annual Report 
for 1938. 
Existing project. Provides for reconstruction from 
timber to concrete at Winnibigoshish, Leech Lake, 
Pokegama, Sandy Lake and Pine River Dams, and 
construction of a concrete dam at Gull Lake. Pokegama 
was built on bedrock and the others on pile foundations. 
A portion of Leech Lake Dam from piers 26 to 39 was 
replaced with an earth fill. Constructed three dikes at 
Winnibigoshish, four at Pokegama, two at Sandy Lake, 
and 16 at Pine River. Sandy Lake Dam includes a lock 
160 feet long, 30 feet wide, with a maximum lift of 9.5 
feet and a depth of 2.5 feet on lower sill at low water 
which was converted to use as a spillway. (See table 27-B 
for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. None. 
Operations and results during fiscal year. Maintenance: 
Reservoirs were operated as required, recreation 
facilities and equipment maintained, and surveys, repairs, 
and reports were made by hired labor at a cost of 
$855,593. Reservoirs were operated by contract at a cost 
of $133,729. Physical security cost $7,496 by hired labor. 
Periodic inspection, bridge and dike inspection, and dam 
safety costs were $125,576 by hired labor, $144,117 by 
contract and $29,363 by other Corps. Cultural resource 
investigation cost $13,931 by contract, $28,406 by hired 
labor and $18,436 by other Corps of Engineers districts. 
Land acquisition analysis and survey cost $23,914 by 
hired labor and $68,958 by contract. Data collection, 
water analysis and maintenance of stream gauging cost 
$90,319 by hired labor, $1,330 by contract and $30,020 
by U.S. Geological Survey. Revision of water regulation 
manuals by contract cost $110,251. Miscellaneous engineering 
and design cost $4,339. Real estate was managed 
by other Corps of Engineers districts at a cost of 
$16,710. Supervision and administration and other miscellaneous 
costs were $261,341. 
Condition at end of fiscal year: Existing project was 
completed in 1937. Flowage rights were acquired on all 
lands affected by construction, maintenance, and operation 
of reservoirs. A total of 1,672.26 acres in fee are 
owned by thet United States. The United States has 
easements, flowage rights, and other rights of use on 
another 296,334.44 acres. Structures are in fair condition. 
Recreation facilities for public use are being constructed 
intermittently at all reservoir areas. (See table 
27-H for capacities and costs by reservoir.) 
4. WARROAD HARBOR AND RIVER, 
MN 
Location. At southwestern extremity of Lake of the 
Woods, 36 miles west of mouth of Rainy River. (See 
NOAA Nautical Chart 14999). 
Existing project. Provides for a channel 8 feet deep 
from landing at Warroad to deep water in lake, channel 
27-2

ST. PAUL MINNESOTA DISTRICT 
being 9,200 feet long, 200 feet wide within harbor, and 
300 feet wide out in lake; for a turning basin 500 by 900 
feet to a depth of 8 feet; and for a pile-brush stone jetty 
on north side of channel extending from shore 700 feet 
into the lake. For additional details see page 1027 of 
Annual Report of 1965. Portion of dredging of entrance 
channel and turning basin to complete project width and 
depth was considered unnecessary to meet present navigation 
requirements, and classified inactive was 
deauthorized on August 5, 1977, under Section 12 of 
Public Law 93-251. (See table 27-B for authorization 
legislation.) 
Local cooperation. None required. 
Terminal facilities. There is one publicly owned 
wharf. There are two commercial fish wharves, one of 
which is served by a spur track, and a number of minor 
wharves, all privately owned. Facilities are adequate for 
existing commerce. 
Operations and results during fiscal year. Maintenance: 
Engineering and design for repair and revetment 
wall cost $4,457. Administrative costs were $310. 
Condition at end of fiscal year: Project is complete. 
Prospective jetty completed in 1910 and reconstructed 
as a rubble mound in 1929 is in good condition. Turning 
basin at Warroad wharves was completed in 1911, and a 
channel 200 feet wide and 8 feet deep in 1915. Controlling 
depth in river channel and lake approach channel 
was 6 feet below low-water datum for a minimum width 
of 100 feet. A walkway on the jetty is provided for public 
use. A revetment wall, constructed under Section 2 of 
Public Law 269, 69th Congress, in accordance with 
Article VIII of the Lake of the Woods Treaty, has 
deteriorated and will require future maintenance. 
5. ZIPPEL BAY, LAKE OF THE WOODS 
COUNTY, MN 
Location. Zippel Bay is a natural harbor located in 
northwestern Minnesota on the south shore of Lake of 
the Woods near Williams, Minnesota. The navigation 
project will be located in Zippel Bay State Park. 
Existing Project. Boats based at a state park, resort, 
marina, and a number of private residences use Zippel 
Bay to provide access to the lake. However, the natural 
channel between the bay and Lake of the Woods varies 
in depth and width and restricts navigation. The plan of 
improvement provides a small-boat access channel 
50-70 feet wide and approximately 1,800 feet long between 
Zippel Bay and Lake of the Woods. Jetties are 
currently being constructed on both sides of the channel 
to minimize the amount of maintenance dredging. The 
project was approved by the Chief of Engineers for 
construction in October 1985 under the authority contained 
in Section 107 of the River and Harbor Act of 
1960, as amended. 
Local cooperation. See Annual Report for 1986 for 
requirements. 
Operations and results during fiscal year. New 
Work: The construction contract cost $203,283. Engineering 
and design and supervision and administration 
of the construction contract costs were $11,763. 
Condition at end of fiscal year: Construction of the 
small boat navigation project is currently under way. 
Flood Control 
6. BASSETT CREEK, MN 
Location. In Hennepin County and Minneapolis, 
Minnesota, on Bassett Creek, a tributary of the Mississippi 
River. (For general location, see Geological Survey 
map of Minnesota.) 
Existing project. The proposed project consists of 
nonstructural and structural flood control measures. 
Nonstructural measures include continuation of existing 
floodplain regulations, flood insurance and forecasting, 
and flood warning. Principal structural measures 
consist of six small control structures in the upper 
watershed to temporarily impound floodwaters and a 
new tunnel (part of which is being constructed on a 
cooperative basis with the Minnesota Department of 
Transportation) in a highly urbanized area of Minneapolis 
to replace the existing tunnel outletting Bassett 
Creek to the Mississippi River. Also included in the plan 
are a limited reach of channel widening, bridge removals, 
culvert replacements, a weir structure, a flood storage 
area, and a railroad bridge replacement. Estimated 
Federal cost (1987) for new work is $23,700,000 and 
$3,819,000 is to be contributed by local interests. Project 
was authorized by the 1976 Water Resources Development 
Act. 
Local cooperation. See Annual Report for 1977 for 
requirements. Under current cost sharing policies, when 
the costs of lands, easements, and rights-of-way are less 
than 20 percent of total project costs, local interests are 
required to furnish the standard local cooperation requirements 
plus a cash contribution, the total of the two 
to amount to a minimum of 25 percent of the total 
project costs. On June 27, 1986, the City of Minneapolis 
entered into a local cooperation agreement with the 
Department of the Army. 
Operations and results during fiscal year. New 
Work: Miscellaneous lands and damages cost $3,567. A 
Stage I construction contract cost $85,134. The city of 
Golden Valley was reimbursed for Section 215 work for 
$304,320 and the Minnesota Department of Transportation 
was reimbursed for $3,642,880. Engineering and 
design cost $199,784 by contract, $782,617 by hired 
labor and $27,963 by other Corps. North Central Division 
real estate cost $895. Supervision and administration 
and other miscellaneous costs were $112,733. 
Condition at end of fiscal year: Construction of the 
first control structures is complete. Design of tunnel and 
other upstream features continues. 
7. BIG STONE LAKE AND 
WHETSTONE RIVER, MN AND SD 
Location. On Minnesota River near Ortonville and 
Odessa, MN, and Big Stone City, SD, at the outlet of Big 
Stone Lake and in Big Stone and Lac qui Parle Coun- 
27-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
ties, MN, and Grant County, SD. (For general location, 
see Geological Survey map of Minnesota.) 
Existing project. Provides for a dam and reservoir on 
Minnesota River above U.S. Highway 75, modification of 
Big Stone Lake outlet dam and silt barrier, bank stabilization 
along lower reach of Whetstone River, channel 
improvement on Minnesota River for 3 miles below 
outlet control dam at Big Stone Lake along with necessary 
relocations and acquisition of lands. These improvements 
would be made for wildlife conservation and 
development, flood control, and recreation. For additional 
details see Annual Report for 1970. Project was 
authorized by 1965 Flood Control Act (H. Doc. 579, 87th 
Cong., 2d sess., contains latest map; and H. Doc. 193, 
88th Cong., 2d sess.). 
Local cooperation. See Annual Report for 1968 for 
requirements. The project requires sponsorship from 
both the States of Minnesota and South Dakota. Formal 
resolution of assurances adopted by the Upper Minnesota 
River Watershed District on June 10, 1969, and 
accepted by the District Engineer on November 3, 1969. 
Formal resolution of assurances adopted by the East 
Dakota Conservancy Sub-District for South Dakota on 
October 23, 1969, was furnished on November 18, 1969, 
and accepted by the District Engineer on November 19, 
1969. Supplemental assurances covering the requirements 
of Public Law 91-646 were provided by the Upper 
Minnesota Watershed District on August 13, 1974, and 
by the East Dakota Conservancy Sub-District on April 
15, 1976. Rights-of way for construction on the Whetstone 
River and the entire cash contribution of $153,000 
for the project were furnished by the local sponsors on 
December 21, 1981. 
Operations and results during fiscal year. New 
Work: Minnesota River channel construction contract 
costs were $8,885. A Big Stone Lake outlet and silt 
barrier contract cost $84,914. Engineering and design, 
supervision and administration and other miscellaneous 
costs were $11,161. Maintenance: Structure was operated 
and maintained and inspections and evaluations 
performed at a cost of $67,579 by hired labor and 
$15,034 by contract. Data collection and water control 
analysis cost $7,864 and $9,722, respectively. Data collection 
by other government agencies cost $39,150. Real 
estate management by the North Central Division cost 
$377. Dam failure planning cost $7,608 by hired labor 
and $3,588 by other districts. Supervision and administration 
cost $26,605. 
Condition at end of fiscal year: Construction of the 
new dam above Highway 75 and roads are completed. 
Surveys for land lines are complete, and the land acquisition 
program is complete. The first land payment was 
made on November 28, 1969, and 128 tracts have been 
purchased. A general plan between the Secretary of the 
Army and the Secretary of the Interior for administrating 
the use of waters, land, or interests therein has been 
consummated, and a cooperative agreement between the 
Corps of Engineers and the U.S. Fish and Wildlife 
Service was approved. On March 31, 1975, the Secretary 
of the Army transferred lands in the project not required 
for Corps of Engineers operation and maintenance to 
the Department of Interior. The transfer of property was 
accepted by the Department of the Interior on May 21, 
1975. Construction on the Whetstone River portion of 
the upstream works is complete. The construction of the 
Minnesota River work is complete. The project was 
transferred to the Upper Minnesota River Watershed 
District for operation and maintenance. 
8. BLACK BEAR AND MILLER 
LAKES, CROW WING COUNTY, MN 
Location. Black Bear and Miller Lakes are near the 
center of the State, 20 miles north of Brainerd, Minnesota. 
The two lakes lie adjacent to the left (east) bank of 
the Mississippi River. Miller Lake is linked to Black 
Bear Lake by a very short channel. In turn, Black Bear 
Lake is joined to the Mississippi River by a one-half mile 
creek. 
Existing project. Spring high water on the Mississippi 
River backs up the creek channel, flooding shoreline 
properties and causing damages to buildings and 
related facilities. Some flooding is experienced here 
every 3 to 5 years. The project consists of an embankment 
across the creek approximately 300 feet upstream 
of its juncture with the Mississippi River. This structure 
has a culvert extending through it which would be 
closed off during periods of high flow on the Mississippi 
River. Residences around the two lakes would be protected 
up to the 500-year flood elevation on the Mississippi 
River with 3 feet of freeboard. The project was 
approved by the Chief of Engineers for construction in 
March 1985 under the authority contained in Section 
205 of the 1948 Flood Control Act, as amended. 
Local cooperation. See Annual Report for 1985 for 
requirements. A local assurance agreement was adopted 
by Crow Wing County, the local sponsor, in July 1985. 
Operations and results during fiscal year. New 
Work: A construction contract cost $98,203. Engineering 
and design cost $8,996 by hired labor. U.S. Fish and 
Wildlife costs were $2,631. Supervision and administration 
costs were $3,506 
Condition at end of fiscal year: Construction of the 
flood protection project at Black Bear and Miller Lakes 
is essentially complete. 
9. CHASKA, MN 
Location. In Carver County in south-central Minnesota 
on the Minnesota River. (For general location, see 
Geological Survey map of Minnesota.) 
Existing project. The plan of improvement consists 
of a levee and interior drainage works along the Minnesota 
River, flood diversion and bypass channels on 
Chaska Creek and East Creek, and appropriate 
floodplain regulation measures. Principal project features 
include: approximately 1.1 miles of upgraded 
levee, 1.5 miles of new levee, and one pumping station 
on the Minnesota River; 1.1 miles of diversion channel 
on Chaska Creek; and 0.3 mile of flood bypass channel, 
and a 1,500-foot conduit on East Creek. Approximately 
1.6 miles of paved recreation trails on top of the levee 
27-4

ST. PAUL MINNESOTA DISTRICT 
and around Courthouse Lake are also included in the 
proposed plan. Estimated Federal cost (1987) for new 
work is $18,300,000 and $2,290,000 is to be contributed 
by local interests. Project was authorized by the 1976 
Water Resources Development Act. (H. Doc. 644, 94th 
Congress, 2d sess., contains latest published map.) 
Local cooperation. See Annual Report for 1977 for 
requirements. A local assurance agreement will be required 
prior to the start of construction. By letter of 
November 3, 1986, the city of Chaska indicated its 
willingness to participate financially in construction of 
a project consistent with the cost sharing and financing 
concepts reflected in the 1986 Water Resources Development 
Act. 
Operations and results during fiscal year. New 
Work: Preconstruction planning was continued at a cost 
of $1,347. 
Condition at end of fiscal year: Preconstruction planning 
is essentially complete. Plans and specifications 
for the first stage of construction are substantially 
complete. 
10. DEVILS LAKE, ND 
Location. In Ramsey County in north central North 
Dakota about 80 miles west of Grand Forks, North 
Dakota. (For general location, see Geological Survey 
Map of North Dakota.) 
Existing project. Involves a system of levees and 
interior flood control facilities at the head of Creel Bay. 
The main embankment across Creel Bay is 1,810 feet 
long and varies from 0 to 27 feet high. The south Creel 
Bay tieback embankment is 1,030 feet long and varies 
from 0 to 3 feet high. The north Creel Bay tieback 
embankment is 2,400 feet long and varies from 0 to 8.5 
feet high. The south embankment is 3,100 feet long and 
varies from 0 to 9.5 feet high. 
The interior flood control system consists of temporary 
stormwater retention ponds immediately north and 
south of the city's sewage lagoons, a 16,000 gallon per 
minute pumping station and a system of ditches and 
culverts linking the ponds to the pumping station. 
Total Federal cost (1987) for the project is estimated at 
$2,670,000. The project was approved by the Chief of 
Engineers for construction August 15, 1983, under the 
authority contained in Section 205 of the 1948 Flood 
Control Act, as amended. 
Local cooperation. See Annual Report for 1983 for 
requirements. 
A local assurance agreement required by Public Law 
91-611 was adopted by the city of Devils Lake in August 
1983. 
Operations and results during fiscal year. New 
Work: Construction contracts cost $22,828. Engineering 
and design cost $45,198 by hired labor. Supervision and 
administration costs were $7,675. 
Condition at end of fiscal year: Construction work on 
the project is substantially complete. 
11. EAU GALLE RIVER, WI 
Location. At and in vicinity of Spring Valley, WI, on 
Eau Galle River 30 miles above its mouth at Chippewa 
River, and its tributary, Mines Creek, which flows 
through the village. Spring Valley is about 45 miles east 
of St. Paul, MN, and 36 miles west of Eau Claire, WI. 
(See Geological Survey map for Wisconsin for general 
location.) 
Existing project. Authorized plan of improvement as 
modified by further studies includes a retarding dam 
and reservoir on Eau Galle River immediately upstream 
from Spring Valley, and remedial works on Mines Creek 
including channel enlargement, a low levee, and a drop 
structure. Project provides for earth and rock-fill dam, 
an uncontrolled outlet and an uncontrolled spillway 
emerging above Mines Creek. See page 1030 of Annual 
Report for 1965 for further details. Proposed improvements 
on Burghardt Creek were eliminated. Improvements 
provide complete protection near Spring Valley 
for standard project flood, and below that point in 
decreasing value in proportion to distance from reservoir. 
Permanent conservation pool will serve a local need 
for a recreational area. Project was authorized by 1958 
Flood Control Act (S. Doc. 52, 84th Cong., 1st sess., 
contains latest published map.) 
Local cooperation. Fully complied with. See page 
1083 of Annual Report for 1967. 
Operations and results during fiscal year. Maintenance: 
Structure and recreation facilities were operated 
and maintained, and inspections, investigations and 
evaluations were performed at a cost of $213,030 by 
hired labor and $13,281 by contract. A road repair 
maintenance contract cost $54,093 and recreational 
maintenance contracts cost $181,914. Real estate management 
by the North Central Division cost $2,805. 
Data collection cost $2,973 by hired labor and $7,000 by 
other government agencies. Water control analysis and 
water quality by other Corps of Engineer districts cost 
$10,929 and $66,805, respectively. Administrative and 
other miscellaneous engineering costs were $110,471. 
Condition at end of fiscal year: Mines Creek improvements 
were substantially completed in 1964: minor 
work was accomplished in 1966. A contract for dam, 
spillway, and discharge channel, started July 1, 1965, 
was completed in October 1968. Recreational facilities 
have been provided. Remedial work to repair eroded 
gutters and road ditches was completed in September 
1973. Repair of failing discharge conduit by installing a 
steel liner was completed in April 1982. 
12. ENDERLIN, MAPLE RIVER, ND 
Location. In Ransom County in southeastern North 
Dakota on the Maple River about 45 miles southwest of 
Fargo, North Dakota. (For general location, see Geological 
Survey Map of North Dakota.) 
Existing project. The project at Enderlin involves a 
system of levees along the right bank of the main stem 
and the left bank of the South Branch of the Maple 
River. The total levee system would be about 1.2 miles 
27-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
long and would have an average height of about 8 feet. 
Other features of the project include channel improvements 
on the south branch, replacement of the Soo Line 
railroad bridge, and interior drainage facilities consisting 
of three ponding areas with gated outlet conduits. To 
prevent failure of the channel and levee by erosion, 
rip-rapping would be provided in selected reaches. 
The project was approved by the Chief of Engineers for 
construction August 11, 1982, under the authority contained 
in Section 205 of the 1948 Flood Control Act, as 
amended. 
Local cooperation. See page 27-5 of Annual Report 
for 1982 for requirements. A local assurance agreement 
required by Public Law 91-611 was adopted by the city of 
Enderlin in July 1982. 
Operations and results during fiscal year. New 
Work: A Phase III Highway 46 frontage road levee 
contract cost $1,159. A Phase IV contract on the south 
branch of the Maple River cost $10,203. Engineering 
and design by hired labor cost $3,982 and by contract, 
$1,374. Supervision and administration cost $3,339. 
Condition at end of fiscal year: Construction of the 
project is substantially complete. 
13. HANOVER, HENNEPIN COUNTY, 
MN 
Location. Hanover is in south-central Minnesota in 
northwest Hennepin County and eastern Wright 
County. The erosion project is located along the right 
bank of the Crow River adjacent to the Hanover Dam in 
the city of Hanover. 
Existing project. County State Aid Highway #19 is 
located on top of the bank of the Crow River and was in 
danger of being lost due to continuing erosion. The 
project consists of placement of fill to reconstruct the 
bank and riprap to protect this bank. The project was 
approved by the Chief of Engineers for construction in 
May 1986 under the authority contained in Section 14 of 
the 1946 Flood Control Act, as amended. 
Local cooperation. See Annual Report for 1986 for 
requirements. A local assurance agreement was adopted 
by Hennepin County, Minnesota, the local sponsor, in 
August 1986. 
Operations and results during fiscal year. New 
Work: A construciton contract cost $151,738 and a printing 
contract, $192. Engineering and design, North Central 
Division real estate management and supervision 
and administration cost $22,895, $790 and $12,859, 
respectively. 
Condition at end of fiscal year: Construction of 
the erosion protection project at Hanover is essentially 
complete. 
14. HOMME LAKE AND DAM, ND 
Location. Dam is on South Branch of Park River 
about 4 miles upstream from Park River, ND, and 62.1 
miles above mouth of Park River. South, Middle, and 
North Branches, headwater streams of Park River, rise 
in Cavalier County in northeastern North Dakota and 
flow easterly to an almost common confluence near 
Grafton, ND, forming main stream which flows easterly 
35 miles to join Red River of the North about 35 miles 
south of the international boundary. (For general location, 
see Geological Survey map of North Dakota.) 
Existing project. See page 1285 of Annual Report for 
1962. Project was authorized as Park River Reservoir by 
1944 Flood Control Act (S. Doc. 194, 78th Cong., 2d 
sess.), and redesignated Homme Reservoir and Dam by 
Public Law 435, 80th Congress, 2d session. Latest published 
map is in project document. 
Local cooperation. Fully complied with. Total costs 
for all requirements of local cooperation under terms of 
project authorization, including required non- 
Federal contributions, were $62,800. In addition, local 
interests contributed $16,220 for construction of a water 
supply outlet through dam and incurred other costs of 
$19,600. 
Operations and results during fiscal year. Maintenance: 
Structure was operated and maintained, and 
inspections and evaluations performed at a cost of 
$65,211. 
Condition at end of fiscal year: Project completed in 
June 1956 except for additional recreational facilities 
which have been done intermittently since that time. 
Construction began in April 1948 and major structures 
completed in May 1951. Structures are in good condition. 
Government has acquired 395 acres of land in fee 
and easements over 7.8 acres of land for project. An 
additional 6.3 acres of land have been donated for 
recreational development and 3.75 acres have been acquired 
due to bank erosion bordering the project. 
15. KICKAPOO RIVER, GAYS MILLS, 
WI 
Location. Left bank of Kickapoo River, in Gays Mills, 
in southwestern Wisconsin. 
Existing project. The project to protect the streambank 
from erosion which threatens a sewage treatment 
digestion tank is authorized under Section 14 of the 
1946 Flood Control Act, as amended. The initial appraisal 
report, dated September 1985, recommended 
protection with 150 cubic yards of gravel bedding and 
300 yards of riprap along about 200 feet of eroding river 
bank. The project was approved for construction by the 
Office Chief of Engineers on June 18, 1986. 
Local cooperation. See Annual Report for 1986 for 
requirements. A local cooperation agreement was 
adopted by the village of Gays Mills, Wisconsin, in 
August 1986. 
Operation and results during fiscal year. New 
Work: A construction contract cost $-1,832. Engineering 
and design and other study costs were $12,187. 
Condition at end of fiscal year: A contract for slope 
protection was awarded in September 1986. Project was 
formally transferred to the village of Gays Mills, Wisconsin 
by a letter dated April 13, 1987. 
27-6

ST. PAUL MINNESOTA DISTRICT 
16. LAC QUI PARLE LAKE 
MINNESOTA RIVER, MN 
Location. Works covered by this project lie along 
Marsh Lake and Lac qui Parle and the Minnesota River 
between head of Marsh Lake and Granite Falls, MN. 
(For general location, see Geological Survey map of 
Minnesota.) 
Existing project. See page 1291 of Annual Report for 
1962. 
Local cooperation. None required. 
Operations and results during fiscal year. Maintenance: 
Project was operated and maintained, and inspections 
and evaluations were performed at a cost of 
$206,388. Dam failure planning cost $4,441 by hired 
labor and $55,427 by other Corps districts. Data collection 
cost $9,707 by hired labor and $36,380 by U.S. 
Geological Survey. Stream gauging and water control 
analysis cost $1,089 and $12,165, respectively. North 
Central Division real estate cost $4,970. Dam maintenance 
contracts cost $44,185 and a radio equipment 
contract, $14,426. Engineering and design and supervision 
and administration cost $45,605 and $44,192, 
respectively. 
Condition at end of fiscal year: Project has been 
operated by the Government since transfer from State of 
Minnesota to the United States in September 1950. The 
United States owns fee title to 517.62 acres of land and 
easements on 19,859.47 acres of land. In 1957, 60.1 
acres were withdrawn from public lands for use by the 
Department of the Army. Land acquisition is complete. 
Construction under present plan of improvement was 
started in September 1941 and completed in December 
1951 except for recreational facilities. All structures are 
in good condition. 
17. LA FARGE LAKE AND CHANNEL 
IMPROVEMENT, WI 
Location. On the Kickapoo River which rises in 
Monroe County in southwestern Wisconsin and flows 
south and southwest through Vernon, Richland, and 
Crawford Counties emptying into Wisconsin River about 
16 miles above junction of latter stream with Mississippi 
River. (For general location see Geological Survey map 
of Wisconsin.) 
Existing project. Provides for a dam and impoundment 
of the Kickapoo River about 1 mile upstream from 
village of La Farge, operated for flood control, fish and 
wildlife conservation, general recreation, and a reduction 
of aggradation downstream from the dam, and 
supplemental protection at Soldiers Grove and at Gays 
Mills by means of levees, supplementary channel improvement, 
and interior drainage facilities. See Annual 
Report for 1975 for details. 
Estimated Federal cost (1976) for new work is 
$55,400,000. Project was authorized by 1962 Flood Control 
Act (H. Doc. 557, 87th Cong., 2d sess., contains 
latest published map.) 
Local cooperation. None required for construction of 
La Farge Lake. See page 1087 of Annual Report for 1967 
for requirements for local protection works. Local interests 
have not been requested to furnish assurances. 
Operations and results during fiscal year. Maintenance: 
Project was operated and maintained at a cost of 
$68,774 which includes a contract for the removal of five 
bridges deemed unsafe for $24,400. 
Condition at end of fiscal year: General and Real 
Estate design memorandums and detailed plans for the 
La Farge Dam and spillway and for relocations have 
been completed. Land acquisition negotiations began in 
December 1968. The first land payment was made on 
January 15, 1969, and the land acquisition program is 
80 percent complete. Contracts for excavation of the left 
abutment, for test wells, and for construction of the 
outlet works and right abutment have been completed. 
A study of alternatives has been completed. Funds to 
complete the authorized project have been withheld and 
all further construction has been indefinitely suspended. 
Work has been accomplished to provide for 
completion of relocation work left partially completed 
when construction was suspended. Soldiers Grove has 
relocated out of the floodplain area after receiving funds 
from other agencies. A study of a modified dry dam was 
completed in early FY 1985. On the basis of the study 
results, it was recommended that no further work be 
done to establish the economic feasibility of a dry or wet 
dam at La Farge and that the La Farge Lake and 
channel improvement project be deauthorized. 
18. LAKE ASHTABULA AND 
BALDHILL DAM, SHEYENNE 
RIVER, ND 
Location. Baldhill Dam is on the Sheyenne River, 16 
miles upstream from Valley City, ND, and about 271 
miles above mouth. Sheyenne River rises in central 
North Dakota and flows 500 miles generally southeast 
to enter Red River of the North about 10 miles north of 
Fargo, ND. (For general location see Geological Survey 
map of North Dakota.) 
Existing project. See page 1287 of Annual Report for 
1962. Project was authorized by Flood Control Act of 
1944 (S. Doc. 193, 78th cong., 2d sess., contains latest 
published map). Reservoir above Baldhill Dam was 
designated as Lake Ashtabula by Public Law 772, 81st 
Congress, 2d session. 
Local cooperation. See page 1288 of Annual Report 
for 1962. Complied with except for construction of Fargo 
diversion dam and ditch for which assurances furnished 
by city of Fargo were approved by the Secretary of War 
on June 26, 1947. Necessity for this feature will be 
reviewed. 
Operations and results during fiscal year. Maintenance: 
Project was operated and maintained, and inspections, 
investigations, monitoring and evaluations 
were performed at a cost of $414,909 by hired labor and 
$8,840 by contract. Dam instrumentation, stability and 
safety assurance cost $409,482. Real Estate Management 
by the North Central Division cost $5,180. U.S. 
Fish and Wildlife Service coordination cost $3,524. Data 
collection cost $9,771 by hired labor and $39,280 by 
27-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
other government agencies. Water control analysis and 
water quality by other Corps of Engineer districts and 
hired labor cost $18,286 and $7,860, respectively. Dam 
safety engineering and design cost $5,469 by contract 
and $26,461 by hired labor. Administrative costs were 
$135,288. 
Condition at end of fiscal year: Project completed in 
March 1956 except construction of recreational facilities 
which is being accomplished intermittently. United 
States owns 7,816.5 acres of land in fee and easements 
on 666.2 acres. Construction initiated in July 1947 and 
major features completed in November 1950. Dam was 
placed in permanent operation in spring of 1951. Structures 
are in good condition. 
19. LAKE DARLING, SOURIS RIVER, 
ND 
Location. On the Souris River in Ward, Renville, 
McHenry, and Bottineau Counties in northwestern 
North Dakota. The existing Lake Darling Dam is located 
about 20 miles northwest of Minot, North Dakota. 
The project also includes features at the communities of 
Sawyer and Velva and at various locations along the 
358-mile U.S. portion of the Souris River. (For general 
location see Geological Survcy Map of North Dakota.) 
Existing project. The current plan of improvement 
authorized by the Water Resources Development Act of 
1986 is the one-time purchase of 400,000 acre-feet of 
flood storage in Rafferty and Alameda Dams in 
Saskatchewan, Canada and the operation and maintenance 
of Rafferty Dam, Alameda Dam and the existing 
Boundary Dam in conjunction with the existing Lake 
Darling Dam to provide 100-year flood protection at 
Minot, North Dakota. The Act also authorizes those 
flood control measures upstream and downstream of the 
dam which are necessary for effective operation of the 
project. The 4-foot raise of the Lake Darling design pool 
(authorized by Section III of the Energy and Water 
Development Appropriations Act, 1982, PL 97-88) and 
the construction of Burlington Dam (authorized by PL 
91-611) will no longer be authorized upon completion of 
the structure(s) in Canada. If it is determined that an 
agreement between Canada and the United States for 
the construction of the Canadian Dams cannot be 
reached, the 4-foot raise of the Lake Darling design pool 
(PL 97-88) shall proceed. 
The work under the current plan authorized by PL 
99-662, consists of either one or two reservoirs in 
Saskatchewan, Canada (known as the Rafferty and 
Alameda projects); a modified outflow structure at Lake 
Darling Dam; a downstream flood warning system from 
the Canadian border; levee improvements at Sawyer and 
six subdivisions from Burlington to Minot, flood proofing 
of about 80 rural homes between Minot and Towner, 
North Dakota and the purchase of flowage easements; 
modifications to dams 87 and 96 in the Upper Souris 
National Wildlife Refuge; modifications to dams 320, 
326, 332, 341 and 357 in the J. Clark Salyer National 
Wildlife Refuge; and compensation to Manitoba, Canada 
for altered return flows. Estimated Federal cost (1987) 
for new work is $76,000,000 and $4,488,000 is to be 
contributed by local interests. 
Local cooperation. See Annual Report for 1983 for 
requirements. Representatives of the water resource 
districts from Ward, Renville, McHenry, and Bottineau 
Counties area agreed to become members of a Souris 
River Joint Board for flood control, which would serve as 
local sponsor for the project. A local cooperation agreement 
for construction at Velva was signed in November 
1984. A local cooperation agreement for the remainder 
of the project as authorized by the Water Resources 
Development Act of 1986 is being developed. 
Operations and results during fiscal year. New 
Work: Preconstruction planning for the Lake Darling 
unit was continued at a cost of $1,240,865. Construction 
costs for improvements at Velva were $1,022,947. Engineering 
and design, and supervision and administration 
costs for Velva were $124,626. 
Condition at end of fiscal year: Construction of the 
levee improvement work at Velva is substantially 
complete. 
20. LAKE PULASKI, WRIGHT COUNTY, 
MN 
Location. Lake Pulaski is approximately 45 miles 
northwest of the Twin Cities of Minneapolis and St. 
Paul, Minnesota. It lies within three local political 
jurisdictions (City of Buffalo, Wright County and Buffalo 
Township). 
Existing project. Lake Pulaski has no natural outlet. 
Prior to construction of this project, the lake had been 
rising, inundating a number of houses or summer residences. 
A combination of a pumped pipeline and 
gravity-flow storm sewers to convey excess water 
through the city of Buffalo from Lake Pulaski to Buffalo 
Lake was constructed to stabilize the lake. Included in 
this project was a storm sewer upgrade which was 
constructed by the city of Buffalo. The lake will be 
maintained at elevation 966.0 feet mean sea level. This 
is the lowest level permitted for an artificial outlet 
under State of Minnesota rules governing landlocked 
lakes. The project was approved by the Chief of Engineers 
for construction in March 1985 under the authority 
contained in Section 205 of the 1948 Flood Control 
Act, as amended. 
Local cooperation. See Annual Report for 1986 for 
requirements. A local assurance agreement was adopted 
by the Lake Pulaski Improvement District, the local 
sponsor, in August 1986. 
Operations and results during fiscal year. New 
Work: A construction contract cost $933,121. U.S. Fish 
and Wildlife Service and North Central Division real 
estate costs were $958 and $953, respectively. Engineering 
and design cost $659 by contract and $19,587 by 
hired labor. Supervision and administration costs were 
$26,695. 
Condition at end of fiscal year: Construction is essentially 
complete. 
27-8

ST. PAUL MINNESOTA DISTRICT 
21. LAKE TRAVERSE AND BOIS DE 
SIOUX RIVER, SD AND MN 
Location. Works covered by this project lie along 
Lake Traverse and Bois de Sioux River between upper 
end of Lake Traverse at Browns Valley, MN, and the 
mouth of Bois de Sioux River at Breckenridge, MN. 
Lake drains through river to Red River of the North, and 
the two waters form a portion of boundary between State 
of Minnesota and States of North and South Dakota. 
(For general location, see Geological Survey map of 
Minnesota.) 
Existing project. See page 1289 of Annual Report for 
1962. Existing project was authorized by Flood Control 
Act of June 22, 1936. 
Local cooperation. None required. 
Operations and results during fiscal year. Maintenance: 
Project and related facilities were operated and 
maintained, and inspections and evaluations performed 
at a cost of $399,078. 
Condition at end of fiscal year: Existing project was 
completed in June 1948, except for minor recreational 
facilities. Fee title to 1,144.13 acres and easements on 
6,172.25 acres of land have been acquired. White Rock 
Dam and Reservation control structures are in operation, 
and structures and appurtenances are in good 
condition. Remedial work for repair of apron at White 
Rock Dam was completed in November 1968. Roadways 
across structure are open to public travel. 
22. MANKATO AND NORTH MANKATO, 
MN 
Location. Along Minnesota River between miles 
103.5 and 109.5 near Mankato, North Mankato, and Le 
Hillier, in south-central Minnesota. (For general location 
see Geological Survey map of Minnesota.) 
Existing project. As modified as a result of severe 
1965 flood, provides for protection of communities of 
Mankato, North Mankato, and Le Hillier by means of 
levees and floodwalls with pumping plants and interior 
drainage facilities. See page 1090 of Annual Report for 
1967 for further details. Additional channel improvement, 
levees, pumping, and interior drainage features 
have been included in the Mankato unit of the project 
for protection from the high flows of Indian Creek. 
Expansion of Indian Creek improvements were made 
during detailed studies as a result of updated hydrologic 
data. Highway bridge relocations made necessary by the 
project have been authorized at Federal expense. Estimated 
Federal cost (1987) for new work is $95,700,000. 
Project was authorized by 1958 Flood Control Act (H. 
Doc. 437, 84th Cong., 2d sess., contains latest published 
map.) Project was modified by 1965 Flood Control Act, 
and by the Water Resources Development Acts of 1974 
and 1976. 
Local cooperation. Requirements have been fully 
complied with. See Annual Report for 1973 for requirements. 
Resolutions agreeing to provide formal assurances 
of local cooperation, when requested, were passed 
by the city council of North Mankato, Mankato, and 
South Bend Township (Le Hillier), respectively, on November 
12, 1968. 
Operations and results during fiscal year. Construction 
of the T.H. 60/Main Street bridge relocation 
was completed. Construction of the C&NW railroad 
bridge relocation and Stage 2B-HP work in Le Hillier 
continued. Construction of Stage 3C-2 and the T.H.169 
Bridge relocation was initiated. Construction costs for 
improvements at Mankato were $7,355,314, at North 
Mankato were $-177,338 and at Le Hillier were 
$2,589,397. Engineering and design by contract cost 
$304,785 and by hired labor cost $160,481. North Central 
Division Real Estate cost $68,365. Supervision and 
administration cost $246,676 by hired labor and $200 by 
contract. Other miscellaneous costs were $2,534. 
Condition at end of fiscal year: Construction of the 
pumping stations, interior drainage facilities and the 
diversion channel are complete. The flood barriers are 
essentially complete except for the short segments of 
floodwall at the Main Street bridge (Stage 3C-2), and 
the Stage 2B-HP levee work underway. 
23. MIDDLE RIVER AT ARGYLE, MN 
Location. In Marshall County in northwestern Minnesota 
on the Middle River within the city limits of 
Argyle, Minnesota. 
Existing project. The plan of protection includes a 
system of levees, road raises along with interior drainage 
facilities to provide main developed parts of the city 
of Argyle with one percent chance flood protection. Also 
included is the evacuation of 12 residences which are 
located outside of the line of flood barrier protection. 
The project was approved for construction on August 1, 
1985, by the Chief of Engineers. The project is being 
constructed under the authority of Section 205 of the 
1948 Flood Control Act, as amended. 
Local cooperation. See Annual Report for 1985 for 
requirements. A local assurance agreement required by 
Public Law 91-611 was adopted by the city of Argyle in 
August 1985. 
Operations and results during fiscal year. New 
Work: Construction improvements cost $1,096 by hired 
labor and $114,115 by contract. Engineering and design 
cost $62,198 by hired labor and $7,320 by contract. 
North Central Division real estate cost $-32. Supervision 
and administration costs were $22,290. Contributions 
in lieu of cash were $-10,653. 
Condition at end of fiscal year: Construction contract 
for Stage I is complete. Work on plans and specifications 
for Stage II is complete. Further work on Stage II is 
being delayed until the city of Argyle provides the 
necessary real estate requirements. The evacuation of 
the 12 residences is substantially complete. 
24. PRAIRIE DU CHIEN, WI 
Location. In Crawford County in southwestern 
Wisconsin on the left bank of the Mississippi River. (For 
27-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
general location, see Geological Survey map of 
Wisconsin.) 
Existing project. Combines total evacuation with 
flood proofing and land use control measures to provide 
the desired reduction of potential flood damages within 
design limits. Evacuation was accomplished by purchase 
and relocation of structures in lowest portions of the 
floodplain. Project was authorized by Water Resources 
Development Act of 1974. 
Local cooperation. See Annual Report for 1974 for 
requirements. A local assurance agreement in accordance 
with Section 221 of the Flood Control Act of 1970 
was entered into with the City of Prairie du Chien on 
May 2, 1978, and signed by the Chief of Engineers on 
September 11, 1978. 
Operations and results during fiscal year. New 
Work: North Central Division real eastate cost $99 and 
real estate audit costs were $3,817. Engineering and 
design cost $6,836 by hired labor and supervision and 
administration cost $1,622. 
Condition at end of fiscal year: Project was completed 
in September 1984. 
25. RED LAKE RIVER, MN, INCLUDING 
CLEARWATER 
RIVER, MN 
Location. Works covered by this project lie along 
upper reach of Red Lake River and also along 
Clearwater River, a tributary of Red Lake River, between 
a point near Plummer, MN, and a point just above 
the mouth of Ruffy Brook. Red Lake River, principal 
tributary of Red River of the North, has its source at the 
outlet of Lower Red Lake in northwestern portion of 
Minnesota and flows westerly about 196 miles to its 
junction with Red River of the North at East Grand 
Forks, MN. Clearwater River has a general westerly 
course from its source near Ebro, MN, about 205 miles 
to its junction with Red Lake River at Red Lake Falls, 
MN. (For general location, see Geological Survey map of 
Minnesota.) 
Existing project. See page 1281 of Annual Report for 
1962. Project was authorized by 1944 Flood Control Act 
(H. Doc. 345, 78th Cong., 1st sess., contains latest 
published map.) 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Maintenance: 
Structures were operated and maintained and 
inspections and evaluations performed at a cost of 
$68,424. 
Condition at end of fiscal year: Construction of major 
improvements on Red Lake River and the Clearwater 
River were completed in June 1956. Replacement of rock 
and brush dam on Red Lake River at Indian boundary 
with a concrete structure and appurtenant work was 
completed in June 1959 to restore marshes in the area to 
better wildlife conditions. Construction of a bridge on 
Clearwater Road was completed by the Indian Service in 
July 1965. A contract for improvements on Red Lake 
River was completed in November 1966, and a contract 
for restoration of water levels in Red Lake River 
marshes was completed in November 1968. Operation of 
Red Lake Dam was assumed by the Corps on April 1, 
1951. Channels are in good condition and indicate 
effectiveness of project as a flood control measure. 
26. RED RIVER OF THE NORTH AT 
ARGUSVILLE, ND 
Location. In Cass County in eastern North Dakota 
near the confluence of the Red River of the North and 
the Sheyenne River about 15 miles northwest of Fargo, 
North Dakota. (For general location, see Geological 
Survey map of Minnesota.) 
Existing project. The project involves a levee encircling 
the city of Argusville with associated interior flood 
control facilities. The total levee system is about 1.9 
miles long and has an average height of about 8 feet. 
Interior flood control facilities consist of interceptor 
ditches and pipes, two temporary ponding areas and a 
pumping station to periodically discharge impounded 
water. Total Federal cost (1987) of the project is estimated 
at $1,600,000. The project was approved by the 
Chief of Engineers for construction July 5, 1985, under 
the authority contained in Section 205 of the 1948 Flood 
Control Act, as amended. 
Local cooperation. See Annual Report for 1985 for 
requirements. A local assurance agreement was adopted 
by the city of Argusville, the local sponsor, in July 1985. 
Operations at end of fiscal year. New Work: Construction 
contracts cost $669,708. Engineering and design 
cost $5,363 by contract and $72,666 by hired labor. 
Supervision and administration costs were $55,437. 
Condition at end of fiscal year: A construction contract 
for Stage 1 involving the west levee was completed 
in July 1986. A construction contract for Stage 2 involving 
the remainder of the project was awarded in August 
1986 and was 90 percent complete at the end of fiscal 
year 1987. 
27. RED RIVER OF THE NORTH 
DRAINAGE BASIN, MN, SD & ND 
Location. Red River of the North Basin, within the 
United States, includes northeastern corner of South 
Dakota and much of eastern North Dakota and northwestern 
Minnesota. Red River of the North, formed by 
confluence of Otter Tail and Bois de Sioux Rivers, flows 
northward through this region, forming boundary between 
North Dakota and Minnesota. (For general location 
of basin, see Geological Survey maps of Minnesota 
and South Dakota.) 
Previous project. See page 1278 of Annual Report for 
1962 for navigation and flood control projects in the 
basin, not part of this project. 
Existing project. Project includes improvements for 
local protection in interests of flood control and major 
drainage accomplished by channel improvement, levees, 
etc., in addition to construction of a multiple purpose 
reservoir on Otter Tail River to control floods and, in 
conjunction with previously authorized Federal reser- 
27-10

ST. PAUL MINNESOTA DISTRICT 
voir project at Baldhill site of Sheyenne River and at 
Red Lake, to increase low flows for water supply and 
pollution abatement. (See table 27-I for active units in 
comprehensive basin plan.) 
Project was authorized by Flood Control Acts of 1948 
and 1950. Public Works Authorization Act, 1957, authorized 
Chief of Engineers to acquire such lands as were 
beyond legal authority of the City of Grand Forks to 
acquire. Section 205 of the Flood Control Act of 1970 
provided for extension of the expiration date for the East 
Grand Forks project. Authorization of the Sheyenne 
River (Kindred Lake) project by the 1970 Flood Control 
Act provided for the deletion of channel improvement on 
the lower 48.8 miles of the Sheyenne River authorized 
under the Flood Control Acts of 1948 and 1950. Latest 
published map is in House Document 185, 81st Congress, 
1st session. 
Local cooperation. See page 1039 of Annual Report 
for 1965. Following the flood of 1965, the City of East 
Grand Forks requested reactivation of the project and 
furnished a resolution adopted May 11, 1965, indicating 
its willingness to meet the requirements of local cooperation. 
Expiration date for the East Grand Forks project 
was extended to April 17, 1975, permitting local interests 
additional time to furnish assurances of local cooperation. 
A local assurance agreement was passed by the 
city on March 27, 1975, and accepted by the acting 
Director of Real Estate, OCE for the Secretary of the 
Army on April 9, 1975. In a July 9, 1986 letter, the city 
of East Grand Forks withdrew support for the project 
presented in the General Design Memorandum. 
Operations and results during fiscal year. New 
Work: Preconstruction planning was continued for the 
East Grand Forks project at a cost of $185,313. Maintenance: 
Orwell Lake and Dam were operated as required 
and miscellaneous inspections, reports, and repairs were 
made at a cost of $146,189 by hired labor and $88,412 by 
contract. Real estate management by the North Central 
Division cost $14,001. Data collection and maintenance 
of stream gauging cost $6,786 by hired labor and $15,610 
by U.S. Geological Survey. Water quality and control 
cost $54,577 by hired labor. Supervision and administration, 
engineering and design and other miscellaneous 
costs were $52,257, $38,591 and $-2,565, respectively. 
Condition at end of fiscal year: Major construction for 
all active units except for East Grand Forks, MN, is 
complete. The East Grand Forks project will be recommended 
for a change in status from active to inactive. A 
total of 1,985 acres of land for Orwell Lake and Dam is 
owned in fee by the United States. See page 1281 of 
Annual Report for 1962 for periods of completion at 
active units of project other than Fargo. Work at Fargo, 
ND, started in May 1959, was completed in July 1963. 
(See table 27-I at end of chapter for total costs of new 
work to date.) 
Costs to date for operation and maintenance of Orwell 
Lake and Dam are $3,721,627. Total costs for active 
portion of project are $11,859,361. In adddition, 
$350,034 was expanded from contributed funds for work 
done for local interests. 
28. REDWOOD RIVER AT 
MARSHALL, MN 
Location. In Lyon County in southwestern Minnesota 
along the Redwood River about 68 miles above its 
confluence with the Minnesota River at the city of 
Marshall, Minnesota. (For general location see Geological 
Survey map for Minnesota.) 
Existing project. See page 1059 of Annual Report for 
1964 for completed channel improvement project authorized 
by 1960 Flood Control Act. Federal costs amounted 
to $1,802,866. The existing flood control project was 
completed in 1963. In response to a need for additional 
flood control, a feasibility study was completed in 1979. 
The project recommended in the feasibility report was 
authorized by the Water Resources Development Act of 
1986, Public Law 99-662, Section 401(a). Improvements 
include 4.7 miles of additional levees, 3.8 miles of bank 
protection, 0.3 mile of new high-flow diversion channel, 
an interbasin overflow structure, modifications to the 
existing diversion and drop structures, and a recreation 
plan. The recreation plan consists of 2.5 miles of 
biking/walking trail, five miles of cross-country 
skiing/hiking trail, and related picnic and rest area 
facilities. The project would provide protection against a 
flood having an occurrence interval of about once in 115 
years. Estimated Federal cost (1987) for new work is 
$4,950,000 and $1,040,000 is to be contributed by local 
interests. 
Local cooperation. Fully complied with for completed 
work. See page 1150 of Annual Report for 1963 
for requirements. Project was transferred to local interests 
on December 23, 1963. 
For new work, see Annual Report for 1985 for requirements. 
By letter dated November 19, 1986, the city of 
Marshall indicated its willingness to participate financially 
in construction of a project consistent with the 
cost sharing and financing concepts reflected in the 1986 
Water Resources Development Act. 
Operations and results during fiscal year. New 
Work: Preconstruction planning was continued at a cost 
of $94,958. 
Condition at end of fiscal year: Construction of completed 
work was initiated August 1962 and completed 
December 1963. Preconstruction planning for the new 
work is in progress. 
29. ROCHESTER, MN 
Location. In Olmstead County in southeastern 
Minnesota on the South Fork of the Zumbro River. 
(For general location, see Geological Survey map of 
Minnesota.) 
Existing project. Provides for stream channel modifications 
and levees functioning in combination with a 
system of seven headwaters reservoirs. Principal features, 
in addition to the reservoirs, include 0.5 mile of 
grass-sloped channels, 6.1 miles of riprapped or gabionlined 
channels, 0.9 mile of architecturally-treated concrete 
channels, 0.5 mile of dredged channel, six drop 
structures, 2.4 miles of levee, and hiking and biking 
27-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
trails. Estimated cost (1987) to the United States for new 
work is $50,500,000 and $8,150,000 is to be contributed 
by local interests. Project was authorized by the Water 
Resources Development Act of 1986 (H. Doc. 156, 93rd 
Cong., 1st sess., contains latest published map.) 
Local cooperation. See Annual Report for 1974 for 
requirements. A local cooperation agreement was signed 
August 27, 1987 by the city of Rochester. 
Operations and results during fiscal year. New 
Work: Preconstruction planning was continued at a cost 
of $563,018, including $41,161 for advance engineering 
and design. 
Condition at end of fiscal year: A construction contract 
for Stage 1A2A was awarded in September 1987. 
Plans and specifications for Stage 1A2B are substantially 
complete. 
30. ROOT RIVER AT HOUSTON, MN 
Location. In Houston County in southeastern 
Minnesota on the Root River in the city of Houston, 
Minnesota. 
Existing project. The plan of protection provides 
levee flood protection together with appropriate flood 
plain regulation measures. Main features of the project 
include 3.1 miles of levee, 0.2 miles of road raise, an 
interior drainage pumping station, and road and rail 
closures. Estimated Federal cost (1987) for new work is 
$7,200,000 and $1,698,000 is to be contributed by local 
interests. The project was approved for construction by 
the 1986 Water Resources Development Act (Public Law 
99-662) and is being reevaluated based on changes since 
the 1975 Feasibility Report. 
Local cooperation. During reevaluation of the 
project, the items of local cooperation will be modified to 
reflect current cost sharing requirements. Local cooperation 
requirements for flood control (other than a 
nonstructural project) are: a) pay 5 percent of the cost of 
the project assigned to flood control during construction 
of the project; b) provide all lands, easements, rights-ofway 
and dredge material disposal area required only for 
flood control and perform all related necessary relocations; 
c) provide that portion of the joint cost of lands, 
easements, rights-of-way, dredge material disposal 
areas and relocations which is assigned to flood control; 
and d) pay an additional amount, if needed, so that the 
non-Federal cost is equal to 25 percent of the cost of the 
project assigned to flood control. The non-Federal share 
shall not exceed 50 percent of the cost of the project 
assigned to flood control. 
Operations and results during fiscal year. New 
Work: Preconstruction planning was initiated at a cost 
of $152,000. 
Condition at end of fiscal year: General Reevaluation 
study was initiated in January 1987 to reevaluate the 
feasibility of the authorized project based on changes in 
existing conditions, public views, and design criteria 
since completion of the feasibility report in 1975. 
31. ROSEAU RIVER, MN 
Location. In Roseau County and northeastern 
Kittson County, in northwestern Minnesota, and in 
south-central Manitoba, Canada. (For general location 
of the works in the United States see Geological Survey 
map of Minnesota.) 
Existing project. Provides for improvement of 
Roseau River for flood control consisting of 44.4 miles of 
channel improvement, two sections of earth levees with 
lengths of 1.9 and 5.9 miles, respectively, 76 side ditch 
inlet transitions; remedial works along 16.6 miles of 
channel in Canada or an acceptable alternative therefor; 
one new bridge; and alteration of the existing dam in 
Roseau Village. Remedial works will be constructed in 
Canada at the expense of the United States. Estimated 
cost (1986) to the United States for new work is 
$23,400,000 including $6,690,000 for cost of work in 
Canada to be accomplished with United States funds 
and $6,600,000 is to be contributed by local interests. 
Project was authorized by Flood Control Act of 1965 (H. 
Doc. 282, 89th Cong., 1st sess., contains latest published 
map.) 
Local cooperation. See Annual Report for 1968 for 
requirements. Local interests have formed a Roseau 
River Watershed District to provide local cooperation 
requirements and acquire rights-of-way. 
Operations and results during fiscal year. New 
Work: Planning activities were continued relative to 
coordination of the project plan with Canadian interests. 
Engineering and design and supervision and administration 
cost, $23,548. 
Condition at end of fiscal year: Planning is in progress 
and coordination with Canadian interests is underway. 
The general design memorandum was submitted in 
October 1971 and approved in March 1972. Design 
memorandum supplements which contain dimensions of 
environmental features added to the project were submitted 
in October 1975 and June 1980 and approved in 
November 1975 and July 1980, respectively. An EIS 
supplement was filed with the EPA in October 1981. 
32. SHEYENNE RIVER FLOOD 
CONTROL, ND (Formerly Kindred 
Lake) 
Location. The Sheyenne River Basin is included in 16 
counties in the southeastern portion of North Dakota 
and drains an area of 7,140 square miles into the Red 
River of the North near Fargo, North Dakota. The 
principal area offlood damages in the basin is located at 
the lower end within Cass County and the City of West 
Fargo. The authorized Kindred Lake project is in 
Richland County, ND, on the Sheyenne River, about 70 
miles above its mouth and 5 miles above Kindred, ND. 
(For general location, see Geological Survey map of 
North Dakota.) 
Existing project. The authorized project provides for 
a multiple-purpose impoundment for flood control, water 
quality control, recreation, and fish and wildlife 
27-12

ST. PAUL MINNESOTA DISTRICT 
purposes to control the runoff from 3,014 square miles. 
The improvements would be coupled with a revised 
operating plan for the existing Baldhill Dam and with 
appropriate flood plain management measures at communities 
along the river. See Annual Report for 1973 for 
details. Project was authorized by 1970 Flood Control 
Act (H. Doc. 330, 91st Cong., 2d sess., contains latest 
published map.) Due to local concerns, a changed set of 
planning criteria, and potential changed conditions, a 
complete reformulation and reevaluation of alternatives 
was undertaken during preconstruction planning. The 
reevaluation studies showed that another alternative 
plan is more favorable than the authorized project. The 
General Reevaluation Report, completed irn 1982, recommends 
implementation of a plan other than the authorized 
plan. The plan recommended in the General 
Reevaluation Report includes levees and diversions at 
West Fargo/Riverside, a flood diversion channel from 
Horace to West Fargo, and a five foot raise of the flood 
control pool at Baldhill Dam. The project as proposed in 
the 1970 Flood Control Act has subsequently been 
replaced with the project authorized by the 1986 Water 
Resources Development Act which stipulated that the 
project shall also include a dam and reservoir of approximately 
35,000 acre-feet of storage for the purpose of 
flood protection on the Maple River. The Kindred Lake 
project was deauthorized by the 1986 Water Resources 
Development Act. Other actions are also identified that 
could be taken by non-Federal interests to enhance the 
degree of flood damage reduction provided by the overall 
plan. The estimated Federal cost (1987) of the plan is 
$38,100,000 and $2,805,000 is to be contributed by local 
interests. 
Local cooperation. See Annual Report for 1971 for 
requirements of the project as authorized. On July 7, 
1982, and May 20, 1983, the North Dakota State Water 
Commission furnished a letter of support for the recommended 
plan for flood control in the lower Sheyenne 
River Basin and also expressed its willingness to act as 
a non-Federal sponsor. On August 2, 1982, and July 30, 
1982, respectively, the City of West Fargo and the 
Southeast Cass Water Resource District furnished letters 
of support and indicated their willingness to cooperate 
with the North Dakota State Water Commission. 
The Southeast Cass Water Resource District reiterated 
its support of the project by letter dated March 30, 1984. 
Operations and results during fiscal year. New 
Work: Preconstruction planning was continued at a cost 
of $688,070. 
Condition at end of fiscal year: The General Design 
Memorandum was completed in April 1987. Preconstruction 
planning is in progress. 
33. SHEYENNE RIVER, VALLEY CITY, 
ND 
Location. In central Barnes County in southeastern 
North Dakota on the Sheyenne River within the city 
limits of Valley City, North Dakota. 
Existing project. The plan of protection includes 
placement of pervious fill, riprap, and suitable bedding 
material for emergency bank erosion protection along a 
400 foot reach of the left bank of the Sheyenne River. 
The purpose of the project is to control the erosion and 
subsequent sloughing threatening College Street and 
utilities under the roadway. The project would provide a 
stable bank and protect both the road and utilities. 
The project was approved for construction on July 25, 
1986, by the Chief of Engineers. The project is being 
constructed under the authority of Section 14 of the 
1946 Flood Control Act, as amended. 
Local cooperation. See Annual Report for 1986 for 
requirements. A local assurance agreement required by 
Public Law 91-611 was adopted by the city of Valley City 
in August 1986. 
Operation and results during fiscal year. New 
Work: A construction contract cost $63,718. Engineering 
and design and real estate management cost $3,610 and 
$569, respectively. Supervision and administration costs 
were $9,122. 
Condition at end of fiscal year: A construction contract 
was awarded in September 1986 and construction 
is near completion. 
34. SOURIS RIVER, VELVA, ND 
Location. In McHenry County in north central North 
Dakota on the Souris River about 24 miles Southeast of 
Minot, North Dakota. 
Existing project. Provides for erosion control along 
the north bank of the Souris River at the sewage lagoons 
serving the city of Velva. The proposed protection plan 
involves the excavation of unstable river bank material 
in two reaches totalling about 600 feet long and the 
placement of a pervious sand and gravel fill and rip-rap. 
The project was approved by the Chief of Engineers for 
construction in July 1986 under the authority contained 
in Section 14 of the 1946 Flood Control Act, as amended. 
Local cooperation. See Annual Report for 1986 for 
requirements. A local cooperation agreement was 
adopted by the city of Velva in July 1986. 
Operation and results during fiscal year. New 
Work: A construction contract cost $77,930. Engineering 
and design and administrative costs were $10,531. 
Condition at end of fiscal year: A construction contract 
for the recommended work was awarded in September 
1986 and construction was substantially completed 
at the end of fiscal year 1987. 
35. STATE ROAD AND EBNER 
COULEES, WI 
Location. In La Crosse County in west-central Wisconsin, 
on the south side of the City of La Crosse. (For 
general location, see Geological Survey map of 
Wisconsin.) 
Existing project. The plan of improvement for local 
protection (flood control) consists of channel deepening 
and enlarging downstream from Hagen Bridge to the 
mouth of Pammel Creek and includes 10,200 feet of 
concrete-lined rectangular channel, a drop chute inlet 
structure, a side channel inlet structure, a stilling basin, 
27-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
a terminus structure, and three new street bridges. The 
upper 4,000 feet of rectangular channel is designed for 
supercritical flow and the remaining 6,200 feet of channel 
is designed for subcritical flow. When completed, the 
project will provide Standard Project Flood (SPF) protection. 
The city replaced a fourth bridge in 1980 that was 
previously included in the authorized plan. The city also 
replaced a railroad bridge in 1985 that was also included 
in the authorized plan. In 1986, the city constructed 400 
feet of rectangular channel in the downstream reach to 
SPF protection. Estimated cost (1987) to the United 
States for new work, exclusive of the Ebner Coulee 
portion of the project which was deleted due to lack of 
economic feasibility, is $26,600,000 and $8,860,000 is to 
be contributed by local interests. Project was authorized 
by 1968 Flood Control Act (H. Doc. 360, 90th Cong., 2d 
sess., contains published map.) 
Local cooperation. See page 826 of Annual Report 
for 1969. The local sponsor withdrew support for the 
project in 1976 citing increased non-Federal costs and 
lack of agreement on local cost sharing between three 
local units of government located within the project 
area. The project was reclassified as inactive on April 7, 
1977, but was reactivated on November 8, 1978, after 
the La Crosse County Board of Supervisors, the La 
Crosse City Council, and the Town of Shelby passed 
separate resolutions on September 17, 1978, July 13, 
1978, and July 10, 1978, respectively, which requested 
continuance of the project. All three groups reaffirmed 
their support by letter in July 1981. On October 4, 1982, 
the city of La Crosse furnished a letter in further 
support for the project and acknowledged that it would 
serve as the local sponsor. The city sent a letter of intent 
again on December 13, 1984, and furnished letters of 
assurance on September 17, 1985 and December 15, 
1986. 
Operations and results during fiscal year. New 
Work: Preconstruction planning was completed at a cost 
of $14,136. 
Condition at end of fiscal year: Preconstruction planning 
is substantially completed. Plans and specifications 
for the first stage of construction are complete. 
Ebner Coulee was classified to "inactive" in 1981 due to 
lack of economic feasibility. 
36. TWIN VALLEY LAKE, WILD RICE 
RIVER, MN 
Location. In Norman County in west-central Minnesota, 
northeast of the city of Moorhead, on the Wild Rice 
River about 2 miles east of Twin Valley, MN. The Wild 
Rice River is a tributary of the Red River of the North. 
(For general location, see Geological Survey map of 
Minnesota.) 
Existing project, The project authorization provides 
for reservoir development on the Wild Rice River near 
Twin Valley, Minnesota, for flood damage reduction, 
recreation, and fish and wildlife enhancement. The 
principal features include an 84 foot high, 7,700 foot 
long, earthen dam, a gated concrete spillway with concrete 
chute and stilling basin, a 10 foot diameter gated 
circular conduit for low flow outlet works, and recreation 
development on the created 540 acre reservoir. Storage 
capacity would provide 7,500 acre-feet for recreation and 
sedimentation and 44,700 acre-feet for flood control. The 
proposed works include development of three recreation 
areas along the margin of the lake for public use. The 
Federal Government would acquire about 3,500 acres of 
land necessary for carrying out the purposes of the 
project. Approximately 2,200 additional acres will be 
acquired to offset fish and wildlife habitat losses associated 
with project construction. 
Estimated Federal cost (1986) for new work is 
$22,200,000. Project was authorized by 1970 Flood Control 
Act (H. Doc. 366, 90th Congress, 2d sess., contains 
latest published map.) 
Local cooperation. See Annual Report for 1971 for 
requirements. Local interests have not been requested to 
furnish assurances. The Norman County Board of Commissioners, 
by resolutions dated November 7, 1974, 
September 19, 1978, and August 26, 1981, has declared 
its intention to provide local cooperation for recreation 
and fish and wildlife enhancement. By letters dated 
August 17, 1982, and August 31, 1984, the Wild Rice 
Watershed Board expressed their support and intent to 
provide local cooperation requirements and participate 
in innovative financing for flood control. The Norman 
County Board of Commissioners has also indicated the 
capability to provide assurances of local cooperation 
relating to flood control improvements. 
Operations and results during fiscal year. New 
Work: Preconstruction planning was continued at a cost 
of $93,437. 
Condition at end of fiscal year: Project will be recommended 
for reclassification to "inactive" status due to 
lack of economic feasibility. 
37. WARNER ROAD, MISSISSIPPI 
RIVER, ST. PAUL, MN 
Location. Left bank of Mississippi River, adjacent to 
Warner Road at about River mile 839, St. Paul, 
Minnesota. 
Existing project. The project to protect the 
streambank from erosion which threatens Warner Road 
was authorized under Section 14 of the 1946 Flood 
Control Act, as amended. The initial appraisal report, 
dated August 1984 recommended protection with 7,660 
cubic yards of graded rock fill along about 350 feet of 
eroding river bank. The project was approved for construction 
by the Office Chief of Engineers on July 2, 
1985, 
Local cooperation. See Annual Report for 1986 for 
requirements. A local cooperation agreement was 
adopted by the city of St. Paul, Minnesota, in August 
1985. 
Operation and results during fiscal year. New 
Work: A bank protection contract cost $-500. Engineering 
and design and other study costs were $29,832. 
Condition at end of fiscal year: A contract for slope 
protection was awarded in December 1985. Project was 
27-14

ST. PAUL MINNESOTA DISTRICT 
formally transferred to the city of St. Paul, Minnesota by 
a letter dated April 10, 1987. 
38. WILD RICE RIVER- SOUTH 
BRANCH AND FELTON DITCH, MN 
Location. In Clay and Norman Counties in westcentral 
Minnesota northeast of the city of Moorhead, 
MN. The South Branch of the Wild Rice River and 
Felton Ditch drain areas of 253 and 122 square miles 
and enter the Wild Rice River at points 29.5 and 20.5 
miles, respectively, above its confluence with the Red 
River of the North. (For general locations, see Geological 
Survey map of Minnsota.) 
Existing, project. Provided for increasing the capacities 
of the South Branch and Felton Ditch channels by 
widening the existing channels through the floodplain. 
Debris removal was accomplished in the lower reaches of 
both streams. In addition, short reaches of low dikes 
were constructed on both banks of Felton Ditch near the 
upper limit of improvement. The plan also included 
bridge and culvert structure alterations, new bridges, 
multi-plate pipe arches, side ditch inlet and lateral ditch 
entry modifications, and a drop inlet structure. The 
project provides flood protection in both watersheds for a 
6-percent chance flood and outlets necessary for removal 
of crop-damaging surface waters from lateral and onfarm 
drainage systems. Project was authorized by 1968 
Flood Control Act (H. Doc. 98, 90th Cong., 1st sess., 
contains latest published map.) 
Local cooperation. See page 826 of Annual Report 
for 1969 for requirements. A local assurance agreement 
in accordance with Section 221 of the Flood Control Act 
of 1970 was executed by the Wild Rice Watershed District 
on October 18, 1978. 
Operations and results during fiscal year. New 
Work: Engineering and design cost $30,160 by contract 
and $80,993 by hired labor and supervision and administration 
cost $9,820. 
Condition at end of fiscal year: The original flood 
control project was completed in 1983. After assuming 
responsibility for its operation and maintenance, the 
local sponsor reported a problem associated with certain 
types of inlets that had been installed. It was determined 
that the problems resulted from a design deficiency. 
The current project is to correct this deficiency by 
realigning/relocating the outlets of 103 culvert inlets. 
The total Federal cost of the remedial work is estimated 
at $1,146,000. The project was approved by the Chief of 
Engineers for construction in February 1987 and a 
contract was awarded in September 1987 under the 
original flood control project authority. 
39. WINONA, MN 
Location. At Winona County in southeastern Minnesota 
on the right bank of the Mississippi River about 725 
miles above mouth of the Ohio River. (For general 
location see Geological Survey map of Minnesota.) 
Existing project. See page 833 of Annual Report fbr 
1968 for completed upstream improvements authorized 
by the Flood Control Act of 1958 providing for a continuous 
flood barrier about 6.1 miles long with related 
pumping and interior drainage facilities. Federal costs 
amounted to $2,147,131 of which $111,500 was expended 
for the portion then deferred for restudy and $17, 
316 was contributed by local interests. 
Improvement authorized in 1971 under Section 201 of 
the Flood Control Act of 1965 (H. Doc. 152, 92d Cong., 
1st sess., contains latest published map) provides for 
levee and floodwall protection with necessary interior 
drainage works for the riverfront and the Lake Winona 
closure reaches, as well as a sound floodplain management 
program to prevent unwise development of the 
area bordered by U.S. Highway 61 and Burns Valley and 
Pleasant Valley Creeks. The plan would also provide the 
downstream flood barrier needed to prevent Mississippi 
River backup flows from entering Lake Winona and 
inundating the area now only partially protected by the 
completed segment of the project authorized by the 1958 
Flood Control Act. The plan would also provide control 
of Burns Valley Creek by means of channel improvement, 
raising and extending the existing levee system, a 
drop structure, an erosion control structure, alteration 
of two highway bridges, and a sewer line modification. 
Earth levees averaging 10 feet in height total approximately 
3.1 miles in length. Concrete floodwalls, also 
averaging about 10 feet in height, total about 2,025 feet 
in length. Resolutions authorizing the project were 
adopted by the Public Works Committees of the House 
on July 29, 1971, and the Senate on November 18, 1971. 
Local cooperation. Fully complied with for completed 
work. See page 833 of Annual Report for 1968 for 
requirements. 
For improvements authorized in 1971 see Annual 
Report of 1972 for requirements. A local cooperation 
agreement required under Section 221 of the 1970 Flood 
Control Act was executed by the City of Winona on 
October 6, 1978. 
Operations and results during fiscal year. New 
Work: Miscellaneous minor construction contracts cost 
$1,237. Engineering and design cost $56,697 by contract 
and $23,316 by hired labor. Real estate management by 
NCD cost $1,179. Supervision and administration and 
other miscellaneous costs were $4,448. 
Condition at end of fiscal year: The upstream improvement 
except for a portion of the project raising and 
extending the existing levee downstream from the Lake 
Winona outlet was completed in August 1967. Work 
authorized in 1971 is substantially complete. Project 
was formally dedicated by the city on October 13, 1985. 
A contract was awarded in September 1987 to repair a 
distressed wing wall on the upstream drop structure in 
reach E-3, Burns Valley Creek. 
40. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Flood control projects turned over to local interests 
were inspected to determine that project channels are 
kept clean and unobstructed, dikes and revetments are 
27-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
in good condition, and structures are in good repair and 
operable. Deficiencies, if any, were minor unless noted 
(See table 27-J on inspection of completed flood control 
projects.) 
Cost for the period was $78,174. Total cost to September 
30, 1987, is $887,603. 
Miscellaneous 
41. OTHER WORK UNDER SPECIAL 
AUTHORITY 
In the Aquatic Plant Control program (Section 302, 
Public Law 298, 89th Congress) coordination with the 
state of Minnesota cost $9,140, and the state of Wisconsin, 
$14,476. Other Corps of Engineer Wisconsin related 
costs were $854. Administrative and other miscellaneous 
costs were $3,244. 
General Investigations 
42. SURVEYS 
Fiscal year cost was $1,442,082 which included six 
flood damage prevention studies, one review for 
deauthorization study, miscellaneous activities, and coordination 
with both Federal and non-Federal agencies. 
Table 27-L provides a specific list and respective fiscal 
year expenditures. 
43. COLLECTION AND STUDY OF 
BASIC DATA 
Fiscal year cost was $247,919 which included the 
items concerning inventory of dams, international water 
studies, flood plain management services and hydrologic 
studies. Table 27-L provides a specific list and 
respective fiscal year expenditures. 
44. CONTINUATION OF PLANNING 
AND ENGINEERING 
Fiscal year cost was $57,575 which included one local 
protection project. For details of the individual project 
see section 28 in text. 
45. ADVANCE ENGINEERING AND 
DESIGN 
Fiscal year cost was $1,212,847 which included seven 
local protection projects and one flood control reservoir. 
Table 27-L provides a specific list and respective fiscal 
year expenditures. For details of the individual projects 
see sections 9, 27, 28, 29, 30, 32, 35 and 36. 
27-16

TABLE 27-A 
ST. PAUL MINNESOTA DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section 
In Text Project 
1. Minnesota River, MN 
2. Reservoirs at 
Headwaters of 
Mississippi River, MN 
4. Warroad Harbor 
and River, MN 
5. Zippel Bay, 
Lake of the 
Woods County, MN 
6. Bassett Creek, MN 
7. Big Stone Lake 
and Whetstone 
River, MN and 
SD 
8. Black Bear and 
Miller Lakes, MN 
9. Chaska, MN 
10. Devils Lake, ND 
11. Eau Galle River, WI 
12. Enderlin, Maple 
River, ND 
13. Hanover, Hennepin 
County, MN 
14. Homme Lake and 
Dam, ND 
15. Kickapoo River 
Gay Mills, WI 
Funding 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maj. Rehab: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Total Cost to 
September 30 
FY84 FY85 FY86 FY87 1987 
44,000 
439,098 
1,361,800 
1,485,496 
17,000 
30,503 
75,000 
52,669 
25,000 
41,949 
1,450,000 
904,550 
128,000 
147,247 
50,000 
32,045 
373,000 
364,914 
1,767,000 
570,621 
331,000 
285,094 
2,600,000 
861,589 
102,000 
108,738 
59,000 
6,605 
1,785,000 
1,673,967 
24,000 
22,720 
34,000 
25,752 
15,000 
14,668 
205,000 
800,088 
302,000 
227,418 
147,000 
59,680 
346,000 
316,949 
213,000 
1,413,067 
575,000 
502,985 
-72,000 
1,898,355 
83,000 
99,956 
-48,300 
7,585 
2,263,000 
2,040,208 
34,600 
38,947 
331,000 
87,146 
415,000 
323,387 
130,000 
221,445 
107,000 
173,867 
274,000 
244,984 
15,000 
52,066 
283,000 
282,907 
1,643,200 
1,964,106 
24,0004 
24,5694 
215,046 
5,522,000 
5,159,893 
104,960 
181,300 
177,527 
113,336 
1,347 
- 100,000 
90,124 75,701 
606,000 
472,034 
361,669 
44,500 
23,960 
68,000 
83,257 
33,000 
22,645 
488,500 
663,301 
20,057 
200,000 
188,474 
64,600 
65,211 
10,355 
27-17 
$ 2,057,7221 
$ 2,057,7221 
2,560,886 
2,560,793 
4,398,6282 
4,398,6282 
25,464,8463 
25,403,0013 
425,000 
425,000 
86,105 
86,105 
1,145,000 
1,144,344 
630,000 
543,2835 
7,652,000 
7,180,863 
12,175,000 
12,174,9146 
2,292,500 
2,275,637 
471,000 
450,045 
1,843,000 
1,842,496 
2,570,000 
2,499,848 
9,039,250 
9,039,250 
5,449,605 
5,346,125 
4,000,000 
3,962,2817 
244,500 
212,434 
1,396,0978 
1,396,0978 
2,268,021 
2,266,660 
33,000 
33,000

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 27-A (CONTINUED) COST AND FINANCIAL STATEMENT 
See Total Cost to 
Section September 30 
In Text Project 
16. Lac qui Parle 
Lakes, MN 
17. La Farge Lake 
and Channel 
Imp., WI 
18. Lake Ashtabula 
and Baldhill 
Dam, Sheyenne 
River, ND 
19. Lake Darling, 
Souris River, ND 
20. Lake Pulaski, 
Wright County, MN 
21. Lake Traverse 
and Bois de Sioux 
River, SD and MN 
22. Mankato and 
North Mankato, MN 
23. Middle River at 
Argyle, MN 
24. Prairie du Chien, WI 
25. Red Lake River, 
MN, including 
Clearwater 
River, MN 
26. Red River of the 
North at 
Argusville, ND 
27. Red River of the 
North Drainage 
Basin, MN, 
SD and ND 
28. Redwood River at 
Marshall, MN 
29. Rochester, MN 
Funding 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
FY84 FY85 FY86 FY87 1987 
263,000 
312,230 
175,614 
21,000 
25,439 
180 
881,200 
898,714 
1,100,000 
1,113,594 
7,500 
7,500 
179,000 
210,966 
7,645,000 
7,835,568 
40,000 
52,937 
-140,000 
-171,891 
26,000 
52,072 
45,000 
44,994 
255,000 
250,178 
200,000 
183,822 
150,000 
149,998 
100,000 
149,589 
1,139,000 
517,273 
38,372 
42,000 
27,484 
1,241,000 
955,731 
3,000,000 
1,641,509 
75,000 
68,764 
203,000 
187,906 
9,176,000 
8,928,093 
215,000 
98,985 
-125,000 
103,876 
123,000 
72,031 
259,000 
108,758 
275,000 
241,385 
481,000 
445,057 
235,000 
118,804 
400,000 
402,047 
384,500 
931,793 
78,000 
68,208 
934,000 
1,082,717 
3,434,000 
3,994,344 
325,000 
106,728 
265,000 
277,289 
10,875,000 
10,276,105 
345,000 
448,055 
-70,000 
-87,787 
100,500 
142,367 
535,000 
233,838 
331,000 
365,679 
385,000 
367,879 
75,000 
133,624 
244,000 
229,894 
476,600 
478,975 
45,600 
68,774 
836,000 
1,084,350 
2,057,000 
2,388,438 
760,000 
981,973 
400,900 
399,078 
10,035,000 
10,550,414 
200,000 
196,334 
12,734 
65,200 
68,424 
570,000 
803,174 
214,000 
185,313 
358,400 
413,858 
190,000 
94,958 
673,000 
563,018 
964,873 
964,873 
5,471,263 
5,388,343 
18,642,000 
18,642,000 
226,600 
223,425 
3,325,6389 
3,325,6389 
13,744,152 
13,738,481 
11,541,000 
10,974,955 
1,167,500 
1,164,96510 
1,339,727 
1,339,727 
3,513,519 
3,495,038 
86,880,500 
85,792,351 
925,000 
904,385 
3,685,000 
3,556,187 
3,120,07911 
3,120,07911 
1,006,502 
998,735 
1,584,000 
1,360,400 
8,173,98412 
8,137,73412 
3,742,934 
3,721,627 
2,452,86613 
2,300,25013 
3,797,000 
3,645,856 
27-18

ST. PAUL MINNESOTA DISTRICT 
TABLE 27-A (CONTINUED) COST AND FINANCIAL STATEMENT 
See Total Cost to 
Section September 30 
In Text Project Funding FY84 FY85 FY86 FY87 1987 
30. Root River at New Work: 
Houston, MN Approp. - - - 250,000 250,000 
Cost - - - 152,000 152,000 
31. Roseau River, MN New Work: 
Approp. 250,000 - - - 2,128,000 
Cost 53,911 19,271 9,748 23,548 1,933,886 
32. Sheyenne River, New Work: 
ND (formerly Approp. 165,000 265,000 711,000 845,000 4,261,000 
Kindred Lake) Cost 152,862 245,105 733,305 688,070 4,092,922 
33. Sheyenne River, New Work: 
Valley City, ND Approp. - - 39,000 72,000 111,000 
Cost - - 26,344 77,019 103,363 
34. Souris River, New Work: 
Velva, ND Approp. - - 42,500 95,000 137,500 
Cost - - 17,937 88,461 106,398 
35. State Road & New Work: 
Ebner Coulees, WI Approp. 350,000 315,000 15,000 - 1,787,000 
Cost 344,756 323,466 20,953 14,134 1,787,000 
36. Twin Valley Lake, New Work: 
Wild Rice River, MN Approp. 30,000 20,000 82,000 75,000 2,118,700 
Cost 1,680 45,983 61,707 93,437 2,114,507 
37. Warner Road, New Work: 
Mississippi River, Approp. - 25,000 209,600 - 250,000 
St. Paul, MN Cost 7,027 23,049 182,419 29,332 250,000 
38. Wild Rice River, New Work: 
South Branch and Approp. - - - 946,000 5,480,700 
Felton Ditch, MN Cost 28,506 7,815 - 120,973 4,655,673 
39. Winona, MN New Work: 
Approp. 2,210,000 2,772,000 - 165,000 32,741,13114 
Cost 2,354,380 2,770,665 186,137 86,877 32,583,86214 
1Includes $117,542 for new work for previous project. 
Excludes $359,202 contributed funds. 
2Includes $681,805 for new work for previous projects. 
3Includes $100,857 for maintenance for previous projects. 
aIncludes $19,000 appropriated and $19,802 expended in 
FY 1987 for condition surveys. 
5Excludes $76,663 contributed funds. 6Excludes $152,223 contributed funds. In addition, 
$484,447 in other contributed funds have been expended for 
work under Government contract paid- for by the Ottertail 
Power Company. 
7Excludes $153,896 contributed funds. 
8Excludes $56,220 contributed funds. 9Excludes $208,000 contributed funds. 
10Excludes $11,782 contributed funds. 
11Excludes $30,020 contributed funds. 
12Includes cost of the Wahpeton-Breckenridge unit, 
$11,239, which is classed as "deferred" and the units on which 
authorization has expired: Maple River, $1,241; Moorhead, 
$27,700; Sheyenne, $37,956. In addition, $203,874 special 
deposit funds and $146,160 in other contributed funds have 
been expended for work under Government contract paid for by 
local interests. 
13Ilncludes $1,802,866 for new work for previous project. 
14Excludes $589,316 contributed funds. In addition, 
$717,809 in other contributed funds have been expended for 
work under Government contract paid for by local interests. 
27-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 27-B AUTHORIZING LEGISLATION 
See 
Sec. Date of 
in Authorizing 
Text Act Project and Work Authorized Documents 
MINNESOTA RIVER, MN 
1. July 13, 1892 Open-channel improvement from mouth to Shakopee to obtain a Annual Report 1891. 
channel of 4-foot depth to accommodate vessels with 3-foot draft. p. 2209 
July 3, 1958 Dredging to provide channel of 9-foot depth from mouth to mile 14.7 S. Doc. 144. 84th Cong., 
2d sess.' 
RESERVOIRS AT HEADWATERS OF MISSISSIPPI 
RIVER, MN 
3. Mar. 3, 1899 Reconstruct 4 of the 5 original dams and surveys to determine extent 
of lands overflowed by reservoirs. 
Mar. 2, 1907 Reconstruct Sandy Lake Dam and construct Gull Lake Reservoir. 
June 25, 1910 Construct an equalizing canal between Winnibigoshish and Leech H. Doc. 363, 61st Cong., 
Lake Reservoirs (no work was done and this part of the project 2d sess. 
abandoned in Act of Mar. 4, 1915.) 
July 27, 1916 Abandonment of ditches connecting Long Lake, Round Lake, and H. Doc. 413, 64th Cong., 
Gull Lake. 1st sess.' 
June 26, 19342 Operation and maintenance provided for with funds from War 
Department appropriations for rivers and harbors. 
WARROAD HARBOR AND RIVER, MN 
4. Mar. 3, 1899 Dredging bar at mouth of Warroad River. Specified in Act. 
June 6, 1900 Entrance channel 300 feet wide and 7 feet deep. H. Doc. 92, 56th Cong., 
2d sess.4 
June 13, 19023 
Mar. 3, 1905 Enlarging turning basin H. Doc. 703, 61st Cong., 
2d sess.4 
June 25, 1910 
July 25, 1912 Deepening to 8 feet. 
Aug. 5, 1977 Deauthorized portion of entrance channel and turning basin to Public Law 93-251 
complete project width and depth. 
'Contains latest published map. 
2Permanent Appropriations Repeal Act. 
3Appropriation. 
4Latest published map is 
Report for 1911. 
opposite p. 1984 in Annual 
27-20

TABLE 27-C 
ST. PAUL MINNESOTA DISTRICT 
OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost To September 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Baudette Harbor, MN Completed 1961 $36,415 $57,768 
Black River, WI 1 1950 67,585 - 
Lake Traverse, MN and SD 3,4 1921 92 - 
Mississippi and Leech Rivers, MN Completed3 1929 277,615 40,251 
Mississippi River between Brainerd and 
Grand Rapids, MN 5 1925 47,794 3,891 
Pine Creek, Angle Inlet, MN Completed 1978 38,700 102,196 
Red Lake and Red Lake River, MN Completed3 1923 9,070 - 
Red River of the North, MN and ND 3,6 1921 293,344 76,209 
St. Croix River, MN and WI Completed 1986 150,410 1,108,355 
Wisconsin River, WI 2,3 1888 
Zippel Bay Harbor, MN Inactive5 1928 27,941 11,139 
1Existing channel adequate for commerce (see table 27-G 
for deauthorized portion of project). 
20Originally included in project 'Fox and Wisconsin Rivers, 
WI'. Abandonment of improvement of Wisconsin River by 
channel contraction works recommended in 1886 and 1887 (H. 
Doc. 65, 49th Cong., 2d sess.). Expenditures included under 
'Fox and Wisconsin Rivers, WI'. No breakdown available. 
3No commerce reported. 
4Abandonment recommended in 1915 (H. Doc. 439, 64th 
Cong., 1st sess.) and June 24, 1926 (H. Doc. 467, 69th Cong., 
1st sess.). 
5Abandonment recommended June 24, 1926 (H. Doc. 467, 
69th Cong., 1st sess.). 
bAbandonment recommended in 1915 (H. Doc. 1666, 63d 
Cong., 3d sess.). 
27-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTITVITIES FOR FY 1987 
TABLE 27-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost To September 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Bonnes Coulee, Velva, ND5 Completed 1985 58,500 - 
Burlington Dam, Souris River, ND Deferred 1983 5,568,5001 - 
Dry Run, IA Completed 1966 1,790,7592 - 
Elk River, MN Completed 1970 259,7003 - 
Grafton, ND Active4 1983 -- - 
Guttenberg, IA Completed 1974 2,361,915 - 
Irving Township, Jackson County, WI5 Completed 1984 189,600 - 
Irving Township at Nicols Road, Completed 1986 158,500 - 
Jackson County, WI5 
LaCrosse, WI Active6 1983 - - 
Lost River, MN Completed 1967 517,519' - 
Lower Branch Rush River, ND8 Completed 1974 1,000,0009 - 
Minnesota River at LeSueur, MN5 Completed 1986 250,00010 
Minneota, MN8 Completed 1963 161,545 - 
Minot, ND Completed 1983 21,479,50011 - 
Mississippi River near Aitkin, MN Completed 1957 1,675,835 - 
Pembina River, ND Active4 1983 - - 
Pembina River Lake, ND Inactive 12 1950 50,000 - 
Red Lake River at Huot, MN5 Completed 1984 64,500 - 
Red Lake River at Red Lake Falls, MN5 Completed 1984 131,000 - 
Red River of the North at Breckenridge, MN5 Completed - 27,500 - 
Red River of the North at Halstad, MN Completed 1986 2,012,000 - 
Red River of the North at Oslo, MN8 Completed 1984 1,960,200 - 
Red River of the North at Pembina, ND8 Completed 1979 2,000,000 - 
Redwood River below Marshall, MN8 Completed 1960 202,400 - 
Rushford, MN Completed 1980 3,192,333 - 
Shepard Road, Mississippi River, St. Paul, MN Completed 1985 250,00013 - 
St. Paul and South St. Paul, MN Completed 1974 8,476,01214 - 
Tongue River Lake, ND Inactive 12 1950 23,695 - 
Upper Iowa River, IA Completed 1964 888,445 - 
Velva, ND8 Completed 1970 334,628 - 
Vermillion River, Hastings, MN8 Completed 1980 999,900 - 
Veteran's Memorial Levee, Mississippi River, Completed 1985 182,000 - 
Hastings, MN5 
Zumbro River, MN Completed 1975 1,284,100 - 
1Advance engineering and design costs only. Project deferred 
with authorization of Lake Darling project. Additional 
authorization required for implementation of recommended 
plan. The Senate Report 97-256 states that the Corps is to take 
no further action to construct Burlington Dam until directed 
to do so by Congress. 
2Excludes $42,766 contributed funds. 
3In addition $87,878 was expended from Public Law 99 
funds in the spring of 1969 for emergency protection and 
incorporation into the permanent project. 
Preconstruction planning has not started. Phase I completed 
under General Investigations. 
5Project authorized by Chief of Engineers under small 
project authority, Section 14, Flood Control Act of 1946, as 
amended. 
6 Preconstruction planning has not started. 
7Excludes $46,034 for the Ruffy Brook unit for which 
authorization expired in April 1966 (see table 27-G). Excludes 
$246 911 contributed funds. 
Project authorized by Chief of Engineers under small 
project authority, Section 205, 1948 Flood Control Act, as 
amended. 
9Excludes $35,000 contributed funds. 
10Excludes $130,300 contributed funds. 
11Excludes $4,167 contributed funds. 
12Further work deferred pending review of project document 
(inactive). 
13Excludes $62,620 contributed funds. 
14Excludes $545,637 contributed funds for new work and 
$38,000 expended by South St. Paul for work in lieu of 
required cash contribution. Excludes an additional $206,629 
expended for work done at request of local interests. 
27-22

ST. PAUL MINNESOTA DISTRICT 
DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report For Deauthorized Expended Expended 
Black River, WI1 1950 Aug. 5, 1977 - 
Black River Lake, WI 1950 Aug. 5, 1977 - - 
Hudson Harbor, WI2 1986 Nov. 17, 1986 - - 
Maple River, ND3 1981 Oct. 6, 1961 $ 1,241 - 
Moorhead, MN3 1981 Oct. 30, 1961 27,700 - 
Ruffy Brook, MN 1967 Apr. 1966 46,034 - 
Sheyenne River, ND3 1981 Dec. 31, 1970 37,956 - 
Warroad River and Bulldog Creek, MN 1974 Nov. 17, 1986 182,000 - 
Warroad Harbor and River, MN 4 1981 Aug. 5, 1977 - - 
1Portion of project for removal of obstructions at various 
points outside the dredged area to clear channel to full project 
width (see table 27-C for costs for completed portion of project). 
2Part of the St. Croix River, Minnesota and Wisconsin 
project (see Section 4 of 1986 Annual Report). 
3Part of Red River of the North Drainage Basin (see 
Section 27 in text and table 27-I for costs for active units of the 
project). 
4Portion of dredging of entrance channel and turning 
basin to complete project width and depth (see table 27-A for 
costs for completed portion of project). 
27-23 
TABLE 27-G

TABLE 27-H RESERVOIRS AT HEADWATERS OF 
MISSISSIPPI RIVER 
(See Section 3 of Text) 
Outlet Watershed Area (square miles) Capacity Previous Projects Existing Projects 
at 
Minimum Above Watershed Maximum 
Stages St. Paul (square Original Stage Com- Com- Total 
Reservoir (feet)1 River (miles) miles) Lake Reservoir (acre-feet) pleted Cost pleted Cost Cost 
Winnibigoshish 6 Mississippi 408 1,442 117 179.4 967,930 1884 $214,000 1900 $173,470 $387,470 
Leech Lake 0 Leech 410 1,163 173 250.9 743,320 1884 171,805 1902 84,380 256,185 
Pokegama 6 Mississippi 344 6602 24 35.0 120,750 1884 85,000 1904 126,030 211,030 
Sandy Lake 7 Sandy 267 421 8 16.6 72,500 1895 114,000 1909 117,020 231,020 
Pine River 9 Pine 199 562 18 23.7 177,520 1886 97,000 1907 133,320 230,320 
Gull Lake 5 Gull 168 287 20 20.5 70,820 - - 1913 86,826 86,826 
Surveys and flowage rights - - - - 160,939 160,939 
Recreational facilities - - - - 2,834,838 2,834,838 
Total new work - - 681,805 - 3,716,823 4,398,628 
Total operating and care - - 100,857 - 24,334,947 24,435,804 
Permanent indefinite 
appropriation for operation 
and care, Feb. 1, 1895 to end of 
fiscal year 1936 - - - - 967,197 967,197 
Rehabilitation - - - - 425,000 425,000 
Total 2,152,840 - $782,662 - $29,443,967 $30,226,629 
1Lower operating limits by regulations approved February 4, 1936, as modified December 29, 1944. 
2Exclusive of area controlled by Winnibigoshish and Leech Lake Dams. 
tTj 
n 
d 
OLj 
0
z
CI 
r
0
c
y
a
U,
i
i
i
i

TABLE 27-I 
ST. PAUL MINNESOTA DISTRICT 
RED RIVER OF THE NORTH DRAINAGE BASIN: 
ACTIVE UNITS IN COMPREHENSIVE BASIN PLAN 
(See Section 27 of Text) 
Total 
Cost to Estimated 
Name of Unit State Type September 30, 1987 Federal Cost 
Orwell Reservoir (Otter Tail River) Minnesota Reservoir $1,916,753 $1,916,7001 
Wild Rice and Marsh Rivers Minnesota Channel improvement 405,056 405,100 
Rush River North Dakota Channel improvement 287,686 287,000 
Sand Hill River Minnesota Channel improvement 548,778 548,800 
Mustinka River Minnesota Channel improvement 440,788 440,800 
Otter Tail River Minnesota Channel improvement 174,768 174,800 
Red River at Grand Forks North Dakota Levees and floodwall 948,895 948,900 
Red River at East Grand Forks Minnesota Levees, floodwall, 
pumping plants 1,696,950 17,500,000 
Red River at Fargo North Dakota Channel improvement, 
levees 1,639,924 1,639,9002 
Total cost to date 8,059,5983 
Total estimated cost 23,862,0004 
'Includes $181,713 for lands and $25,045 for recreation 
facilities. 
2Includes $67,900 for lands. 
3Costs of $11,239 for the Wahpeton-Breckenridge inactive 
unit not included. Authorization of the Sheyenne River, 
Moorhead, and Maple River units has expired. Cost of these 
units also not included total $66,897. 
4The Wahpeton-Breckenridge unit of the project is classed 
as 'deferred' and is excluded from the estimate. The cost of this 
unit, last revised in 1955, was estimated to be $666,000. The 
Flood Control Act approved December 31, 1970 (H. Doc. 
330-91-2) provided for deletion of the Sheyenne River unit, and 
authorization of the Maple River and Moorhead units expired 
at the end of the 5-year period within which local interests 
were required to furnish assurances of local cooperation. Authorization 
of these units, not included, expired on the dates 
indicated in table 27-G. 
27-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 27-J INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 40 of Text) 
Date Inspected 
Big Stone Lake and Whetstone River, MN & SD ............................... 
Black River at North Bend, WI........................................... 
Breckenridge, M N ..................................................... 
Decorah, IA ............................................... ........... 
Eau Galle River, WI (Mines Creek Improvements) .............................. 
Elk River, M N .............................................. .......... 
Enderlin, Maple River, ND .............................................. 
Forest River, ND ............................................. ......... 
Grand Forks, ND...................................................... 
Guttenberg, IA ...................... ......... ........ ......... 
Irving Township at Nicols Road, Jackson County, WI ............................ 
Irving Township, Jackson County, WI....................................... 
Kickapoo River, Gays Mills, WI........................................... 
Lost River, M N ........................................................ 
Maple River, ND............................................ .......... 
Mankato and North Mankato, MN ........................................... 
M inneota, M N ........................................................ 
M ustinka River, M N................................................... 
Otter Tail River, MN ........................................ ........... 
Park River, ND................... ............................... 
Plum Creek at New Haven Township, MN ................................... 
Prairie du Chien, WI .................................... 
Red Lake and Clearwater Rivers, MN ....................................... 
Red River of the North at Fargo, ND ......................................... 
Red River of the North at Halstad, MN ....................................... 
Red River of the North at Oslo, MN .......................................... 
Red River of the North at Pembina, ND....................................... 
Redwood River at Marshall, MN.......................................... 
Redwood River below Marshall, MN.......................................... 
Rushford, M N ................................................ ........ 
Rush River, N D .............................................. ......... 
Sand Hill River, MN................................................... 
Shepard Road, Mississippi River, St. Paul, MN ................................. 
Sheyenne River, ND .................................................... 
Trempealeau River at Arcadia, WI........................................ 
Upper Iowa River, IA ................................................... 
Vermillion River, Hastings, MN .......................................... 
Veterans Memorial Levee, Mississippi River, Hastings, MN ....................... 
Wild Rice and Marsh Rivers, MN ......................................... 
Wild Rice River, Norman County, MN ........................................ 
Wild Rice River-South Branch and Felton Ditch, MN ............................ 
W inona, M N .............................................. ........... 
Zumbro River, M N ........................................... .......... 
September 1987 
August 1987 
September 1987 
September 1987 
September 1987 
October 1986 
September 1987 
October 1986 
September 1987 
August 1987 
August 1987 
August 1987 
August 1987 
October 1986 
November 1986 
September 1987 
September 1987 
October 1986 
October 1986 
October 1986 
September 1987 
August 1987 
October 1986 
September 1987 
September 1987 
September 1987 
September 1987 
November 1986 
September 1987 
August 1987 
October 1986 
October 1986 
November 1986 
October 1986 
August 1987 
August 1987 
November 1986 
November 1986 
October 1986 
October 1986 
November 1986 
September 1986 
August 1987 
27-26 
Proj-ect I L- -- 
- -- '' I- --- --

ST. PAUL MINNESOTA DISTRICT 
TABLE 27-K FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to Section 205, Public Law 858, 
80th Congress, as amended (preauthorization) 
Study/Project and Location Fiscal Year Costs 
Anoka, MN ...................................................................... $7,500 
Beaver Lake, Stearns County, MN ................................................ 703 
Beebe Lake, Frankfort, MN ........................................................ 2,859 
Briggs Lake Chain, MN ......................................................... .. 7,500 
Diann Lake, Sherburne Co., MN ............. ....................................... 7,500 
Emerson, Manitoba/Noyes, MN .................................................... 35,793 
English Coulee, Grand Forks, ND .................................................. 36,901 
Fridley, MN ........................ ................ ................... ... 819 
Gilmore Creek, Winona, MN ..................................................... 47,377 
Gilmore Lake, Washburn County, WI ............................................... 7,500 
Helene Lake, Sherburne Co., MN .................................................. 7,500 
Jordan, M N ...................................................... ............. 5,852 
Lac qui Parle, MN ............................................................. 33,339 
La Crosse, W I ..................................................... ............ 7,500 
Lake Cantlin, MN................................................ .............. 34,637 
Lake Carnelian, Stearns County, MN................................................ 4,162 
Lake Charlotte, MN ........................................................... 20,922 
Lansing, IA ...................................................... ............. 7,500 
Little Minnesota River, Browns Valley, MN ........................................... 7,500 
Minnesota River, Henderson, MN ................................................... 234,728 
North Fork Crow River, Lake Koronis, MN ............ ........................ 3,000 
Neche, ND ......................................... ............................ 257 
Pelican Lake, Frankfort, MN ....................................................... 2,818 
Rabbit River, Wilken County, MN ................................................... 7,500 
Red River, Perley, MN............................................................. 7,500 
Root River, Hokah, MN........................................................... 2,461 
Sanders Creek, Boscobel, WI ....................................................... 11,580 
Sandy Lake, MN ................................................................ 5,000 
Shell Lake, W I.................................................... ............ 5,833 
Sheyenne River, Harwood, ND ..................................................... 2,058 
Snake River, Alvarado, MN ....................................................... 78,610 
Trempealeau River, Arcadia, WI .................................................. 102,871 
Vermillion River, Farmington, MN .................................................. 2,577 
Whitewater River, Elba, MN ....................................................... 3,000 
Wild Rice River, Ada, MN......................................................... 26 
27-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 27-K (CONTINUED) FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency bank protection (Section 14 of 
the 1946 Flood Control Act, Public Law 526, 79th Congress) 
Study/Project and Location Fiscal Year Costs 
Blue Earth River, MN ........................................................ $7,500 
Cannon River, Faribault, MN ..................................................... 7,500 
Minnesota River, Upper Sioux Reservation, MN ......................... ............ 10,000 
Minneapolis Barge Terminal, MN.................................................. 7,500 
Mississippi River, Alma, WI ...................................................... 1,276 
Mississippi River, Itasca, MN ..................................................... 2,000 
Mississippi River, Pettibone Park, LaCrosse, WI ...................................... 10,000 
Mississippi River, Wabasha, MN ................................................... 10,000 
Mississippi River, Lake Andrusia, MN.............................................. 8,057 
Pickwick, M N ..................................................... ........... 2,000 
Red River at Breckenridge, MN ................................................... 7,500 
Zumbro River at Genoa, MN ...................................................... 9,000 
Zumbro River near Jarrett, MN ................................................... 9,845 
Zumbro River, Millville, MN ...................................................... 7,500 
Emergency flood control activities - 
repair, flood fighting, and rescue work 
(Public Law 99, 84th Cong., and antecedent legislation) 
Project Fiscal Year Costs 
Disaster preparedness......................................................... $249,026 
Rehabilitation .............................. ....... ........................... 27,681 
Total emergency flood control activities ......................................... 276,707 
27-28

ST. PAUL MINNESOTA DISTRICT 
TABLE 27-L GENERAL INVESTIGATIONS 
(See Sections 42, 43, 44 and 45 of Text) 
Study Identification Fiscal Year Costs 
SURVEYS 
Flood Damage Prevention Studies 
Minnesota River Basin, MN ................................................ $382,396 
Mississippi River, Coon Rapids Dam to Ohio River.............................. 91 
Red River of the North, MN and ND ......................................... 535,064 
St. Croix River, MN and WI ................................................ 3,041 
Souris River, ND .......................................................... 2,465 
Wild Rice-Marsh Rivers, MN................................................ 235,457 
Review for Deauthorization 
Tongue River, ND ......................................................... 893 
Miscellaneous Activities 
Special Investigations ..................................................... 31,453 
FERC Licensing Activities.................................................. 2,001 
Coordination with Other Agencies 
Soil Conservation Services .................................................. 2,059 
Bureau of Reclamation ..................................................... 5,023 
Planning Assistance to States-MN ........................................... 55,578 
Planning Assistance to States-ND ........................................... 135,540 
Planning Assistance to States-WI ............................................ 51,021 
TOTAL SURVEYS ......................................................... $1,442,082 
COLLECTION AND STUDY OF BASIC DATA 
Inspection of Dams ........................................................ $3,343 
International Water Studies ................................................ 55,1781 
Flood Plain Management Services 
Flood Plain Management Services Unit ..................................... 103,965 
Technical Services, General ............................................... 35,410 
Hydrologic Studies 
Sedimentation Studies ................................................... 46,000 
Stream FlowData ..................... ............. .................... 4,023 
TOTAL COLLECTION AND STUDY OF BASIC DATA.............................. $247,919 
CONTINUATION OF PLANNING AND ENGINEERING 
Redwood River at Marshall, MN ............................................ $57,575 
ADVANCE ENGINEERING AND DESIGN 
Chaska, MN ............................................................ $1,347 
East Grand Forks, MN .................... 18..5..,.3..1..3........................ 
Redwood River at Marshall, MN............................................. 37,383 
Rochester, MN ........................................................... 41,161 
Root River at Houston, MN ................................................. 152,000 
Sheyenne River, ND ....................................................... 688,070 
State Road and Ebner Coulees, WI .......................................... 14,136 
Twin Valley Lake, Wild Rice River, MN ....................................... 93,437 
TOTAL ADVANCE ENGINEERING AND DESIGN ................................ $1,212,847 
lIncludes $46,139 for International Water Studies under O&M Appropriation. 
27-29

ROCK ISLAND, IL, DISTRICT* 
This district comprises most of the northern half of Illinois, 
portions of southern Wisconsin, southern and southwestern 
Minnesota, eastern and central Iowa, and northeastern 
Missouri, embraced in drainage basin of Mississippi River 
and its eastern and western tributaries between mile 300 
(above mouth of Ohio River) and 614, and of its eastern 
tributaries only, between Hamburg Bay, at mile 261 and 300. 
This district also includes the Illinois Waterway above mile 
80 with its tributaries and drainage basins. The section of the 
Mississippi River between river miles 300 and 614 is included 
in the report on Mississippi River between Missouri River and 
Minneapolis, MN. 
IMPROVEMENTS 
Navigation Page 
1. Illinois and Mississippi Canal, IL ............ 28-2 
2. Illinois Waterway, IL and IN ................ 28-2 
3. Mill Creek and South Slough at Milan, IL ..... 28-3 
4. Mississippi River between Missouri River 
and Minneapolis, MN ..................... 28-3 
5. Upper Mississippi River Environmental 
Management Program, IL, IA, MN, MO, WI ... 28-3 
6. Other Authorized Navigation Projects ........ 28-3 
7. Work under Special Authorization............ 28-3 
Flood Control 
8. Ames Dam and Reservoir, Skunk River, IA .... 28-4 
9. Bettendorf, IA ........................... 28-4 
10. Coralville Lake, IA ........................ 28-4 
11. Davenport, IA .............................. 28-4 
12. Des Moines Recreational River and 
Greenbelt, IA ............................ 28-5 
13. Farm Creek, IL .......................... 28-5 
14. Milan, IL ................................ 28-5 
15. Red Rock Dam and Lake Red Rock, IA ........ 28-5 
16. Rockford, IL .............................. 28-6 
17. Saylorville Lake, IA .................... 28-6 
18. South Quincy Drainage and Levee District, IL... 28-6 
19. Waterloo, IA .............................. 28-7 
20. Inspection of Completed Flood 
Control Projects ........................ 28-7 
21. Other Authorized Flood Control Projects ...... 28-7 
22. Flood Control Work Under Special 
Authorization.............................. 28-7 
General Investigations Page 
23. Surveys ................................ 28-7 
24. Collection and Study of Basic Data ........... 28-7 
25. Continuation of Planning and Engineering .... 28-7 
26. Advance Engineering and Design ............ 28-7 
Tables 
Table 28-A Cost and Financial Statement ........ 28-9 
Table 28-B Authorizing Legislation ............ 28-11 
Table 28-C Other Authorized Navigation 
Projects .......................... 28-14 
Table 28-D Not Applicable 
Table 28-E Other Authorized Flood 
Control Projects ................... 28-15 
Table 28-F Not Applicable 
Table 28-G Deauthorized Projects ............. 28-17 
Table 28-H Inspection of Completed Flood 
Control Projects ................... 28-17 
Table 28-I Flood Control Work Under Special 
Authorization .................... 28-19 
Table 28-J Illinois Waterway: Existing 
Locks and Dams ................. 28-20 
Table 28-K Illinois Waterway: Lock and Dam 
Construction, Foundations, Cost ..... 28-20 
Table 28-L Illinois Waterway: Additional 
Features Entering into Cost ......... 28-21 
Table 28-M Illinois Waterway: Existing 
Project ...................... . 28-22 
Table 28-N Illinois Waterway: Total Cost of 
Existing Project .................. 28-22 
28-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. ILLINOIS AND MISSISSIPPI 
CANAL, IL 
Location. This canal extends for 75 miles from the Illinois 
River near LaSalle, IL, to the Mississippi River at Rock 
Island, IL. A feeder canal, 29 miles in length, extends from 
the summit level of the canal to the Rock River at Rock Falls, 
IL.
Existing project. See pages 1306-1308 of Annual Report 
for 1962 for details regarding project. The canal was constructed 
in the period 1892-1918. The canal has not been 
operated for navigation since June 1951 in accordance with 
Corps policy to discontinue operation of waterways affording 
little or no benefit to navigation. The River and Harbor Act 
of 1958 authorized the appropriation of $2,000,000 for the purpose 
of placing the canal in proper condition for public recreational 
use and to convey and transfer the canal to the State 
of Illinois as part of the State park system. The repair and 
modification program was initiated in 1961, and a number 
of canal features have been repaired or modified. In connection 
with this program, fee title to 1,062 acres and recreational 
flowage easements over 309 acres of land in Rock 
River at Rock Falls, formerly under navigation flowage easement, 
have been acquired. The State of Illinois accepted title 
to the canal as of August 1, 1970. The River and Harbor Act 
of 1970 authorized the additional appropriation of $6,528,000 
to be expended for the repair, modification, and maintenance 
of bridges, title transfer, modification or rehabilitation of 
hydraulic structures, fencing, clearing auxiliary ditches, and 
for the repair and modification of other canal property 
appurtenances. 
Local cooperation. None required. 
Operations during fiscal year. Further repair and 
modification continued under the 1986 new authorization 
pending fund appropriations. Engineering and design work 
cost $377,489 during FY 1987. 
The repair and modification work was underway until a suit 
was filed by three Illinois counties against .the Federal 
Government and the State in 1974 over maintenance of 
highway bridges crossing the canal. After the lawsuit was 
filed, further rehabilitation work by the Federal Government 
on the canal was suspended. On 4 November 1981, the Corps 
of Engineers deposited $3,722,572 with the Clerk of the U.S. 
Districk Court in Chicago in full satisfaction of the Court's 
judgment. These funds are currently being used by the counties 
to complete bridge rehabilitation work as directed in the 
court order. 
Rehabilitation by the Federal Government was restarted 
in FY 1984 with the remainder of the $8,528,000 funding 
authorization depleted in FY 1987. 
The Water Resources Development Act of 1986 authorized 
an additional appropriation of $8,472,000 to accomplish 
the work described in the 1970 River and Harbor Act. 
2. ILLINOIS WATERWAY, IL AND IN 
Location. Illinois River (entirely within State of Illinois), 
formed by confluence of Kankakee and Des Plaines River, 
flows southwesterly and enters Mississippi at Grafton, IL, 
about 38 miles above St. Louis. Illinois Waterway comprises 
Illinois River from its mouth to confluence of Kankakee and 
Des Plaines Rivers (273 miles); Des Plaines River to Lockport 
(18.1 miles) and Chicago Sanitary and Ship Canal and South 
Branch of Chicago River to Lake Street, Chicago (34.5 miles). 
Also from a point 12.4 miles above Lockport, IL, waterway 
comprises Calumet-Sag Channel and Little Calumet and 
Calumet Rivers to turning basin 5, near entrance to Lake 
Calumet (23.8 miles); and Grand Calumet River from junction 
to 141st Street, deep (lake) draft navigation (9 miles) and 
to Clark Street, Gary, IN (4.2 miles). 
Previous projects. For details, see page 1945 of Annual 
Report for 1915 and page 1172 of Annual Report for 1932. 
Existing project. See table 28-K and page 1255 of Annual 
Report for 1963. Cost of new work is $124,041,436 and includes 
$445,000 for Recreation Facilities under Code 711. 
Calumet-Sag Modification, Part III, placed in the deferredfor-
restudy category in March 1972, cost of $33,000,000 (July 
1971) Federal and $20,700,000 (July 1971) non-Federal; and 
widen Marseilles Canal to 300 feet, a portion of work 
authorized by River and Harbor Act of 1935, placed in the 
deferred category, cost of $1,859,300 (July 1972) Federal, are 
all excluded from present cost estimate. See Table 28-B for 
authorizing legislation. 
(See tables 28-J through 28-N on existing locks and 
dams; lock and dam construction, foundations, cost; additional 
features entering into cost of project; existing project, 
and total cost of existing project.) 
Local cooperation. Complied with for completed modifications 
and Part I of Calumet-Sag Modification. 
All pools above Alton Pool: 
Maintenance: Channel dredging by the Dredge 
DUBUQUE was performed at various locations in LaGrange 
pool at a cost of $670,000 with a total of 147,176 cubic yards 
of material being removed; and by the dredge WILLIAM A. 
THOMPSON at a cost of $161,300 with 161,780 cubic yards 
of material being removed. Dredging inspection and approval 
were completed at a cost of $51,800. Strike removal and snagging 
and clearing was accomplished in various locations by 
hired labor at a cost of $291,600. Maintenance of the Lucas- 
Berg Disposal Facility cost $9,000, and contractor earned 
$32,400 on a construction mitigation contract at this facility. 
Structural repairs to locks and dams were performed by hired 
labor at a cost of $1,099,800. Contractor earned $845,200 for 
repairs to the west embankment of the Lockport pool. Contractor 
completed replacing valve operating machinery at 
O'Brien Lock at a cost of $59,700. Repairs to upstream lock 
gate at Lockport Lock were completed by contract at a cost 
of $26,200. Cortractor substantially completed construction 
of a combined maintenance building and central control station 
at Marseilles L/D at a cost of$410,700. Contractor earned 
$226,900 for construction of maintenance/office building at 
Peoria Lock and Dam. Storage building was constructed for 
$58,200 at Starved Rock Lock and Dam. Dredged 
28-2

ROCK ISLAND IL, DISTRICT 
material disposal activities and other environmental concerns 
in connection with dredging cost $9,200. Real estate 
support of maintenance activities cost $39,600. Buildings, 
grounds, and utility maintenance at locks and dams and 
Illinois Waterway Project Office at Peoria totaled $126,100. 
Permanent operating equipment costs were $138,500. 
Engineering and design work, including preparation of 
design memorandums cost $189,000, and supervision and administration 
for the maintenance features totaled $251,300. 
Total maintenance costs were $4,696,500. Net credits to the 
project were $202,100, primarily as a result of collection of 
damages from towboat companies to lock and dam structures. 
Operation and Care: Operation of the locks and dams 
and routine maintenance and minor repairs thereto were 
made at a cost of $5,884,300. Illinois Waterway Project Office 
at Peoria was continued at a cost of $680,400. Real estate 
management services were provided at a cost of $31,200. 
Visitor's Center at Starved Rock Lock and Dam was operated 
at a cost of $162,400 with contract law enforcement provided 
at a cost of $10,300. Surveys, studies, and other inspections 
were performed at a cost of $696,900; natural resource activities 
cost $10,300; and water control management costs were 
$578,700; and the amount of $2,900 was expended on Master 
Plans. Supervision and administration for the operation 
features totaled $196,800. Total operation costs were 
$8,254,200. 
Total operation and maintenance costs were p12,748,600 
for all pools above Alton Pool. 
Rehabilitation: Rehabilitation work at LaGrange, 
Peoria, Marseilles, Brandon Road, and Lockport Lock Locks 
and Dams was in progress. Costs at LaGrange were 
$7,799,556; at Brandon Road, $6,857,788; at Lockport, 
$636,834; and at Marseilles, $6,703,906; and at Peoria, 
$8,574,267; for a total of $30,572,351. 
Alton Pool Operation: Costs by hired labor for condition 
and operation studies were $124,740; water control management 
$59,859; and supervision and administration $28,935. 
Alton Pool Maintenance: Costs for the year were 
$411,769 for dredging and $17,267 for supervision and 
administration. 
Total cost for work in Alton Pool was $642,570. 
Total operation and maintenance costs for all pools above 
Alton Pool were $12,748,600; Alton Pool operation and 
maintenance costs were $642,570; for a total operation and 
maintenance cost of $13,391,170. 
3, MILL CREEK AND SOUTH SLOUGH 
AT MILAN, IL 
Location. Mill Creek and South Slough are small 
streams, tributaryto the Rock River, at Milan, Rock Island 
County, IL. 
Existing project. The existing project providedfor flood 
protection at the village of Milan necessitated by the construction 
of the Illinois and Mississippi Canal. The project consisted 
of diversion of Mill Creek into South Slough, floodgates 
in the walls of the Illinois and Mississippi Canal to carry Mill 
Creek flood waters across the canal right-of-way into Rock 
River, levees, and other works for flood protection. The project 
was constructed in 1931-1932. In 1962-1963, $73,366 was 
expended from Illinois and Mississippi Canal maintenance 
funds for restoration of the Mill Creek outlet into Rock River. 
See Table 28-B for authorizing legislation. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Minor channel maintenance 
was performed at a cost of $305. 
4. MISSISSIPPI RIVER BETWEEN 
MISSOURI RIVER AND 
MINNEAPOLIS, MN 
For report on this improvement, see chapter on "Mississippi 
River between Missouri River and Minneapolis, MN." 
5. UPPER MISSISSIPPI RIVER SYSTEM 
ENVIRONMENTAL MANAGEMENT 
PROGRAM, IL, IA, MN, MO, WI 
Location. The project is located in the Mississippi River 
Basin encompassing a 5-state area including IL, IA, MN, MO, 
and WI. 
Existing project. The project represents the initial implementation 
of the master plan prepared by the Upper 
Mississippi River Basin Association (report dated January 
1982). Project features include long-term resources monitoring, 
habitat rehabilitation and enhancement, recreation 
improvenent and studies, traffic monitoring, and computerized 
inventory and analysis. The project was initiated in FY 
1986 utilizing funds provided by the FY 1985 Supplemental 
Appropriation Act. The execution of the project will be closely 
coordinated with the Upper Mississippi River Basin Association, 
other Federal agencies, affected States, and local communities. 
See Table 28-B for authorization legislation. 
Local cooperation. Local cooperation agreements will be 
sought as required. 
Operations during fiscal year. Costs during the year 
totaled $1,571,225. The majority of funds were expended on 
two program elements: habitat projects and continuation of 
long term resource monitoring. Design was initiated on nine 
projects, continued on five, and construction completed on 
one. Funds were also used for the recreation economics study, 
the traffic monitoring program, and the general plan. 
6. OTHER AUTHORIZED NAVIGATION 
PROJECTS 
See Table 28-C. 
7. NAVIGATION WORK UNDER 
SPECIAL AUTH. 
COMMERCIAL HARBOR STUDY, 
DUBUQUE COUNTY, IA 
Location: The area is located at the Peru Bottoms at the 
mouth of the Little Maquoketa River located north of 
28-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Dubuque, Iowa. 
Existing Project: The existing barge terminal capacity 
at the city of Dubuque is not expected to be able to accommodate 
future volumes of primary commodities. 
The Reconnaissance Report completed in December 1986 
concluded that there was no Federal interest in commercial 
harbor development at Dubuque County due to economic 
infeasibility. 
Operations during fiscal year: Reconnaissance Report 
was completed at a cost of $5,099. 
Flood Control 
8. AMES DAM AND RESERVOIR, 
SKUNK RIVER, IA 
Location. The Ames Lake project is located on the Skunk 
River in Story County, IA, about 5 miles upstream from the 
city of Ames, IA. 
Existing project. Major project features would include a 
dam constructed of compacted impervious earth with gated 
outlet works and spillway; a subimpoundment forming a 
30-acre lake by blocking a ravine with embankment for access 
road crossing the dam; relocations consisting of roads, 
telephone and power lines; and remedial protection for Story 
City by levee and street raises. The conservation pool would 
have a surface area of 2,100 acres and the full flood control 
pool would have a surface area of 5,000 acres. The project was 
authorized to store water for flood control, water quality control, 
recreation, and fish and wildlife benefits. Current study 
efforts concluded that a smaller scaled down project was the 
only feasible alternative. The scaled down project would have 
a surface area of 1,850 acres and the full flood control pool 
would have a surface area of 3,620 acres. See Table 28-B for 
authorizing legislation. 
Local cooperation. By letter dated October 26, 1973, the 
Governor of IA advised "There is general agreement that the 
project provides definite flood control benefits to the downstream 
landowner. However, the costs associated with it and 
the values to be foregone as a result of the project outweigh 
the benefits. Therefore, at this time, the State's position must 
be that of general opposition to the project." Due to the State's 
position in regard to the project, it was reclassified from the 
"active" to the "inactive" category on June 20, 1974. By letter 
dated March 6, 1984, the city of Ames, IA, provided a copy 
of a resolution that the City Council adopted February 28, 
1984, requesting reactivitation of the project. The project was 
approved for reactivation on July 2, 1984. By letters dated 
August 27, 1986 and September 9, 1986, the Iowa Department 
of Natural Resources and City of Ames, Iowa advised 
that they did not support the scaled down project. See Table 
28-B for authorizing legislation. 
Operations during fiscal year. New work: The General 
Reevaluation Report was approved in September 1987. Project 
has been recommended to be classified inactive. Costs 
totaled $127,082. 
9. BETTENDORF, IA 
Location. The city of Bettendorf is located on the right 
bank of the Mississippi River 485.7 miles above the mouth 
of the Ohio River, in Scott County, IA. 
Existing project. Local flood protection from the 
Mississippi River to be provided by construction of 3 miles of 
earth levee, railroad raises, closure structures, and street 
raises and ramps. Construction was started in July 1982. Project 
cost is $16,291,980 including $1,510,000 non-Federal cost 
for lands and relocations. See Table-28B for authorizing 
legislation. 
Local cooperation. Fully complied with. 
Operations during fiscal year. New work: Construction 
continued. The project is 100 percent completed. Costs for 
1987 were $993,110. 
10. CORALVILLE LAKE, IA 
Location. Coralville Lake is formed by the Coralville 
Dam on the Iowa River, several miles upstream from Iowa 
City, Johnson County, IA, about 83 miles above the confluence 
of the Iowa River with the Mississippi River. 
Existing project. See page 28-4, Annual Report for 1981, 
for project details. Construction began in July 1949 and the 
project has been in operation since February 1958. About 
24,406 acres of land were acquired in fee, and flowage 
easements obtained for 9,494 acres. The project was modified 
to provide fori construction of a highway bridge crossing the 
lake at the Mehaffey site, which was begun in June 1964 and 
completed in October 1966. See Table 28-B for authorizing 
legislation. 
Local cooperation. None required, except in connection 
with the Mehaffey Bridge, which has been fully complied 
with. 
Operations during fiscal year. New work: Additional 
land acquisition to provide for the present plan of reservoir 
operation performed at a construction cost of $132,327. Maintenance: 
Routine maintenance activities continued at a cost 
of $2,225,575. Reservoir maintenance and operation funds FY 
cost of $66,678. Expenditures from return of recreation use 
fees were $83,789. 
11. DAVENPORT, IA 
Location. The city of Davenport is located on the right 
bank of the Mississippi River, 482.4 miles above the mouth 
of the Ohio River, in Scott County, IA. 
Existing project. Local protection to the city from floods 
on the Mississippi River to be provided by construction of 
levees, floodwall, interior drainage facilities and pump plants, 
closure structures, and recreational facilities. The project also 
provides for the enhancement and preservation of Nahant 
Marsh at the downstream edge of the city as a wetland area 
with important contribution to environmental quality. The 
Water Resources Development Act of 1986 authorized the 
Nahant Marsh. It included the acquisition of 163 areas of 
marshland as a mitigation measure for the Davenport project. 
28-4

ROCK ISLAND, IL, DISTRICT 
Estimated federal cost is $388,000; non-federal cost, $129,000. 
Estimated project cost for Davenport is $37,400,000 including 
$11,700,000 non-federal costs. See Table 28-B for authorizing 
legislation. 
Local cooperation. The city has withdrawn support for 
the project because of high costs and public opposition. 
Operations during fiscal year. New work: Preconstruction 
costs were $1,538. 
12. DES MOINES RECREATIONAL 
RIVER AND GREENBELT, IA 
Location. The greenbelt area is located along both banks 
of the Des Moines River in central IA and extends from a 
point at which relocated U.S. Highway 92 crosses the Des 
Moines River near Harvey, upstream approximately 169 
river miles to U.S. Highway 20 at Fort Dodge, IA. It includes 
the Corps' operated Lake Red Rock and Saylorville Lake 
projects. 
Existing project. The project will include, but not be 
limited to: (1) the construction, operation, and maintenance 
of recreational facilities and streambank stabilization structures; 
(2) the operation and maintenance of all structures constructed 
before the date of authorization of this project (other 
than any such structure operated and maintained by any person 
under a permit or agreement with the Secretary); (3) such 
tree plantings, trails, vegetation, and wildlife protection and 
development and other activities as will enhance the natural 
environment for recreational purposes; and (4) the prohibition 
or limitation by the Secretary of the killing, wounding, 
or capturing at any time of any wild bird or animal in such 
areas as may be directed by the Secretary. In carrying out the 
project, the Secretary may acquire by purchase, donation, exchange, 
or otherwise, land and interests therein, as the 
Secretary determines are necessary to carry out such project. 
The authorization requires that an Advisory Committee 
will be established for consultation with the Department of 
the Army consisting of three Corps of Engineers appointees, 
one person from the city of Des Moines, and one from each 
other incorporated municipality within the greenbelt, two 
from each of eight counties in the greenbelt, and five from the 
State of Iowa. See Table 28-B for authorizing legislation. 
Local cooperation. Letters of Assurance have been furnished 
by Polk County (28 Oct. 85), City of Johnson (11 Nov. 
85), Iowa Conservation Commission (6 Dec. 85), City of Ft. 
Dodge (5 Dec. 85), City of Swan (7 Dec. 85), Marion County 
(16 Dec. 85), Jasper County (16 Dec. 85), Boone County (18 
Dec. 85), Webster County (14 Jun. 86), City of Des Moines (7 
Apr. 86) andthe Town of Lehigh (13 Mar. 86). 
Operations during fiscal year. The General Design 
Memorandum and Environmental Impact Statement were 
completed. Construction of Bennington Bridge Access was 
completed. Costs incurred were $404,519. 
13. FARM CREEK, IL 
Location. Farm Creek watershed in Tazewell County, IL, 
is 60 square miles in extent. Stream empties into Illinois 
Waterway at mile 162 above mouth. 
Existing project. See page 28-5, Annual Report for 1983 
for description of project. See Table 28-B for authorizing 
legislation. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Maintenance: Routine 
maintenance activities were continued at a cost of $93,704. 
14. MILAN, IL 
Location. The village of Milan is located on the south 
bank of the Rock River several miles upstream from the confluence 
of that stream with the Mississippi River at mile 
479.1 above the mouth of the Ohio River, in Rock Island 
County, IL. 
Existing project. Local protection against direct flooding 
from Rock River and Mill Creek and against backwater 
flooding from the Mississippi River to be provided the community 
by construction of levees, floodwalls, closure structure, 
bridges, pumping stations, drainage facilities, and street 
ramps. Construction was initiated in March 1981. The 
estimated project cost is $17,645,400, including $3,440,000 
non-Federal cost for land and relocations. See Table 28-B for 
authorizing legislation. 
Local cooperation. Fully complied with. 
Operations during fiscal year. New work: Construction 
of the project continued at a cost of $1,017,500. The principal 
work item was levee construction. The project is about 99 percent 
completed. 
15. RED ROCK DAM AND LAKE RED 
ROCK, IA 
Location. The site of this project is on the Des Moines 
River, chiefly in Marion County, but extending into Jasper, 
Warren, and Polk Counties. The dam is 142.9 miles above the 
mouth of the Des Moines River, which empties into the Mississippi 
River at mile 361.4 above the mouth of the Ohio River. 
The city of Des Moines lies northwesterly from the site, about 
60 miles upstream. 
Existing project. See page 28-6, Annual Report for 1981 
for description of the project. Construction began in May 
1960, and the dam was placed in beneficial use for storage of 
flood water in January 1969. Land acquired for the project 
consisted of 47,615 acres in fee and 29,057 acres in flowage 
easement. Landowner complaints, that lake operations have 
flooded their lands more frequently than what they were told 
to expect when flowage easements were initially acquired, led 
Congress to modify the project authorization. Language in 
PL 99-190 authorizes acquisition from willing sellers fee 
simple title in real property, which is subject to periodic 
flooding in connection with the operation of the project. Potentially, 
there are approximately 1,000 tracts consisting of 
about 30,000 acres involved. Estimated Federal cost is 
$28,900,000. See Table 28-B for authorizing legislation. 
Local cooperation. None required. 
Operations during fiscal year. New Work: A Real 
28-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Estate Design Memorandum was initiated in FY 86 and completed 
in FY 87. Maintenance: Routine maintenance activities 
were continued at a cost of $2,801,950. Flood control 
reservoir maintenance and operation funds FY cost of 
$66,678. Expenditures from the return of recreation use fees 
were $72,852. 
16. ROCKFORD, IL 
Location. The city of Rockford is located along both banks 
of the Rock River, in Winnebago County, IL. Kent Creek is 
a small stream, tributary to the Rock River, which flows 
through the right-bank portion of the city. 
Existing project. The project provides flood protection for 
the right-bank portion of the city from floods on Kent Creek. 
It consists of a rolled earth dam with outlet works and 
spillway on North Branch Kent Creek in Page Park; 12,000 
feet of channel cleanout and straightening on North Branch 
Kent Creek; raise of Levings Lake Dam on South Branch 
Kent Creek and construction of spillway and diversion channel; 
10,800 feet of channel cleanout and straightening on 
South Branch Kent Creek; and relocations. Construction was 
initiated in October 1978. The estimated project cost is 
$16,930,000, including $6,430,000 for land and relocations. 
See Table 28-B for authorizing legislation. 
Local cooperation. Fully complied with. 
Operations during fiscal year. New work: Construction 
of the project was continued at a cost of $159,867. The principal 
work item was channel cleanout on South Branch Kent 
Creek. The project is about 88 percent completed. 
17. SAYLORVILLE LAKE, IA 
Location. The project site is chiefly in Polk County, IA, 
but portions extend into Dallas and Boone Counties. The dam 
is about 213.7 miles above the mouth of the Des Moines River 
and about 5 miles upstream from the city of Des Moines, IA. 
Existing project. The dam is an earth embankment 
6,750 feet long at crest with a height of 120 feet. Outlet works 
are a single circular concrete conduit, 22 feet in diameter, 
located at the toe of the west bluff. Control structure is at 
upstream end of conduit and houses three gates. A stilling 
basin is provided to dissipate energy of discharge from outlet 
conduit. Spillway is in west bluff, weir 430 feet long. Water 
flowing over the spillway weir discharges into a paved chute 
and thence into an escavated earth channel to the Des Moines 
River. Top of spillway is about 31 feet below top of earth 
embankment section, and flow over weir is uncontrolled when 
water in reservoir reaches its crest. Watershed area above 
dam site is 5,823 square miles. With pool at spillway crest 
elevation, lake area is 16,700 acres and contains about 
676,000 acre-feet of water at that height (602,000 for flood 
control and 74,000 for a conservation pool to maintain 
minimum flows at downstream points). Lake supplements 
capacity of downstream Lake Red Rock at river mile 142.9. 
The two lakes provide a high degree of flood protection to the 
lower Des Moines River Valley. Reaches along the Mississippi 
River downstream from the mouth of the Des Moines River 
are also benefited. 
A project modification plan to minimize the adverse environmental 
effects at Ledges State Park, located upstream from 
the dam, was authorized in 1976. The project modification includes 
relocation of affected park facilities, acquisition of additional 
park land, and the development of a floodway corridor, 
with recreational facilities, from the dam downstream to 
Sixth Avenue in Des Moines. Improvements to Highway 415, 
the main access road to existing facilities on the east side of 
the reservoir, were added to the project by Congress in 1984. 
Construction began in June 1965, and the dam was placed 
in operation for the storage of flood water in April 1977. 
Remedial work in Big Creek Valley, consisting of a diversion 
dam and channel and a barrier dam, for the protection of the 
town of Polk City was completed in December 1974. The land 
acquisition program involved 26,526 acres acquired in fee, 
flowage easements for 1,925 acres. The estimated project cost 
is $128,216,000, including $2,770,000 non-Federal costs from 
the State of Iowa and the City of Des Moines, Iowa toward 
recreational development. See Table 28-B for authorizing 
legislation. 
Local cooperation. Fully complied with. 
Operations during fiscal year. New work: The principal 
work item was the construction of recreational facilities 
and improvements to Highway 415, and on engineering and 
design work for the downstream floodway corridor. New work 
costs were $4,740,366. Routine maintenance activities were 
continued at a cost of $3,362,400. Maintenance: Reservoir 
maintenance and operation funds FY costs of $66,678. 
Expenditures from return of recreation use fees were $16,742. 
The project is about 96 percent completed, excluding deferred 
work. 
18. SOUTH QUINCY DRAINAGE AND 
LEVEE DISTRICT, IL 
Location. The South Quincy Drainage and Levee 
District, in Adams County, is located on the left bank of the 
Mississippi River between river miles 318 5 and 325.5 just 
south of Quincy, Illinois. It is bounded by the Mississippi 
River on the west, the river bluffs on the east, Curtis Creek 
on north, and Mill Creek on the south. 
Existing project. About 8.8 miles of earth levee and a 
pumping station constructed by local interests and improved 
by the Federal Government in 1967 was designed and built 
to provide protection against a flood having a 2 percent 
chance of being equaled or exceeded in any one year. Increasing 
the level of protection to a 500-year change of occurrence 
includes raising the existing levee approximately 3.5 feet in 
height and adding .4 mile of levees and floodwall. Associated 
features of the proposed plan include raising and resurfacing 
existing road ramps, and a railroad closure structure. See 
Table 28-G for authorizing legislation. 
Local cooperation. Fully complied with. 
Operations during fiscal year. The General Design 
Memorandum was completed in FY 87. Continuation of Planning 
and Engineering costs were $2,374. The first major construction 
contract for Stage I (levees and floodwalls) was 
28-6

ROCK ISLAND, IL, DISTRICT 
awarded. Costs for FY 87 were $231,040. 
19. WATERLOO, IA 
Location. The city of Waterloo is located along both banks 
of the Cedar River in Black Hawk County, IA. The U.S. 
Highway No. 20 and Lafayette Street Bridges cross Blowers 
Creek, an interior stream within the area of Blowers Creek 
Improvements of the Waterloo local flood protection project. 
Existing project. The 100 percent complete project provides 
local protection to the city of Waterloo from floods on 
the Cedar River, Black Hawk Creek, Virden Creek, and 
Blowers Creek. It consists of 15.4 miles of earth levee, 2 miles 
of floodwall, 11,330 feet of channel improvement, an impounding 
dam on Virden Creek, and interior drainage 
facilities including 8 pumping plants. Construction was initiated 
in August 1972. The project cost was $63,620,100, 
including $15,000,000 non-Federal cost for land and relocations. 
See Table 28-B for authorizing legislation. 
The Water Resources Development Act of 1986 authorized 
modification of the Waterloo Flood Protection Project by providing 
for the reconstruction of the U.S. Highway 20 Bridge 
and LaFayette Street Bridge over Blowers Creek in the city 
of Waterloo. Estimated federal cost is $1,150,000; non-federal 
cost, $1,150,000. 
Local cooperation. Local cooperation agreements will be 
sought as required. 
Operations during fiscal year. None. Waterloo 
(Bridges) Project is not funded. -$140,363 construction credit 
or adjustment for the Waterloo project in FY 87. 
20. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Federal flood control regulations (part 208 of title 33, Code 
of Federal Regulations) provide that the structures and 
facilities constructed by the United States for local flood protection 
shall be continuously maintained in such a manner 
and operated at such times and for such periods as may be 
necessary to obtain the maximum benefits. Costs during the 
period for inspections of projects turned over to local interests 
to ascertain compliance with Federal requirements were 
$138,167. (See Table 28-H for list of completed flood control 
projects inspected.) 
21. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See Table 28-E. 
22. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood Control Activities, Section 205, Public Law 84- 
685. See Table 28-I. 
Snagging and Clearing of Navigable Streams and 
Tributaries in Interest of Flood Control, Section 208, 
Public Law 83-780. See Table 28-I. 
Emergency Bank Protection (Section 14 of the 1946 
Flood Control Act, Public Law 526.) See Table 28-I. 
Emergency Flood Control Activities, Public Law 99, 
84th Congress. See Table 28-I. 
General Investigations 
23. SURVEYS 
Flood control studies in progress included the Mississippi 
River, Coon Rapids to Ohio River; the Illinois River from 
Henry to Naples, IL; Quincy Bay, IL; and the Vermilion River 
Basin, IL. Total cost of flood control studies was $231,580. 
Special investigations, FERC review, SCS Coordination, and 
Planning Assistance to States efforts totaled $114,466. Total 
cost of surveys was $346,046. 
24. COLLECTION AND STUDY OF 
BASIC DATA 
Flood plain management services cost $136,689. Hydrologic 
studies, including general studies, sedimentation studies, 
streamflow studies, and rainfall studies cost $1,825. Total cost 
for collection and study of basic data was $138,514. 
25. CONTINUATION OF PLANNING 
AND ENGINEERING 
None accomplished. 
26. ADVANCE ENGINEERING AND 
DESIGN 
The Hannibal, MO, project area is on the right bank of the 
Mississippi River at the city of Hannibal, MO, 309 miles 
above the mouth of the Ohio River. The project would provide 
flood protection to the business and industrial area of the city 
of Hannibal by the construction of a system of levees and 
floodwalls. The plan also includes a pumping plant, closure 
structures for railroads and streets, alteration of the existing 
sewage system, and a tainter gate closure at the mouth of 
Bear Creek. Advance planning on the project was begun in 
1962; however, in 1965 further work was discontinued 
because of lack of local support. Local interest revived in 1979, 
and the project was reclassified from "inactive" to the 
"active" category. A study has been undertaken to reformulate 
the project to meet existing needs of the project area between 
Mark Twain Memorial Bridge and Bear Creek and to 
reflect current Federal and State criteria for water resources 
projects. No action toward fulfillment of local cooperation requirements 
has been taken. Detailed studies for reformulation 
of the project and evaluation of alternatives were continued 
at a cost of $119,421. 
The Loves Park, IL, project, authorized by the Water 
Resources Development Act of 1986, lies in Winnebago 
County, IL, on the northeast boundary of the city of Rockford, 
17 miles south of the IL-WI State line. The project would provide 
local flood protection (100-year level) for the city of Loves 
Park, IL, against flooding of Loves Park Creek (formerly called 
the Large Unnamed Creek). Protection measures would 
consist of 17,350 feet of channel improvements, a 75,000 GPM 
pump plant, and ponding. The General Design Memorandum 
28-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
was initiated in FY 87. Total cost of advance engineering and 
design was $297,235. See Table 28-B for authorizing Legislation. 
The Moline, IL, project is located on the left bank of the 
Mississippi River, 485.7 miles above the mouth of the Ohio 
River, in Rock Island County, IL. Local protection at Moline 
from Mississippi River floods to be provided by construction 
of 4 miles of earth levee and floodwall, closure structures, 
aesthetic and recreational development, and interior 
drainage facilities consisting of gravity outlets, storm sewer 
interceptors, and pumping plants. Construction has not yet 
been initiated due to gaps in Federal funding. Local interests 
will be requested to furnish assurances after a firm project 
plan is established. Preconstruction planning continued at 
a cost of $260. See Table 28-B for authorizing legislation. 
Located in Muscatine and Louisa Counties, Muscatine 
Island Levee District and Muscatine-Louisa County Drainage 
District No. 13, together with the city of Muscatine, Iowa form 
a joint drainage and flood protection area for 30,700 acres of 
bottom land. The project was authorized by the Water 
Resources Development Act of 1986 subject to a favorable 
Chief's Report and approved by the Secretary of the Army. 
The project will provide flood protection by increasing the 
height of the existing main stem levee and flank levee. A 
revised Feasibility Report was completed in July 1986. The 
General Design Memorandum was initiated in FY 87 at a cost 
of $25,843. See Table 28-B for authorizing legislation. 
The West Des Moines - Des Moines, Iowa project is located 
in Polk County in central Iowa. The recommended project of 
levees and floodwalls will provide flood protection from the 
Raccoon River, Walnut Creek, and Jordan Creek for approximately 
927 urban acres. The project was authorized by the 
Water Resources Development Act of 1986. FY 87 Supplemental 
Appropriations Bill included funds for the project. 
Funds were received on 25 Sep 87 and were carried over into 
FY 88. These funds will be used to initiate work on the 
General Reevaluation Report (GRR) in FY 88. See Table 28-B 
for authorizing legislation. 
Total cost for advance engineering and design was 
$442,759. 
28-8

ROCK ISLAND, IL, DISTRICT 
TABLE 28-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 September 1987 
1. Illinois and 
Mississippi Canal, 
IL 
2. Illinois Waterway, 
IL and IN 
3. Mill Creek and 
South Slough at 
Milan, IL 
5. Upper Mississippi 
River Environmental 
Management Program, 
IL, IA, MN, MO, WI 
8. Ames Dam and 
Reservoir, Skunk 
River, IA 
9. Bettendorf, IA 
Cc 
10. Coralville Lake, IA 
11. Davenport, IA 
12. Des Moines 
Recreational River 
and Greenbelt, IA 
13. Farm Creek, IL 
800,000 99,000 695,000 
57,049 330,888 359,615 
- 7,605,1431 
- 7,605,1431 
42,558 17,933,3682 
377,489 17,921,6772 
.- - - 126,707,7513 
-- - - 126,706,4193 
13,673,299 10,476,000 10,847,351 12,491,000 238,239,7474 
13,738,078 10,655,009 10,797,875 12,748,599 235,061,4804 
17,025,000 15,270,000 13,841,000 29,671,000 105,221,625 
18,248,288 10,389,719 16,528,634 30,572,350 103,428,239 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost. 
Maint: 
Approp. 
Cost 
Rehab: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
ontributed Funds 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
10,000 
11,895 
2,000 
270 305 
- 30,000 814,000 1,683,000 
- - 442,750 1,571,225 
- 250,000 144,000 100,000 
- 194,053 172,865 127,081 
3,315,000 2,800,000 
3,701,200 2,952,322 
- 289,121 
1,965,000 
2,086,884 
2,101,000 
2,329,008 
95,717 
2,037,000 
3,656,994 
2,453,500 
2,524,087 
2,240 
3,741,000 1,159,000 
3,853,355 993,110 
- -1,047 
270,052 18,021 
507,889 
2,290,600 
2,045,866 
132,327 
2,048,522 
2,225,575 
1,538 
15,000 238,000 371,000 
- 163,997 404,519 
142,000 
70,314 
52,000 
98,920 
60,000 
79,811 
63,7195 
63,7195 
396,553 
387,449 
2,527,000 
2,013,975 
2,285,800 
2,285,799 
14,781,980 
14,580,649 
288,074 
288,073 
29,969,4886 
29,710,6366 
25,459,627 
23,222,892 
1,689,717 
1,689,371 
624,000 
568,516 
- 9,859,0207 
- 9,859,0207 
89,000 2,774,232 
93,074 2,671,199 
28-9 
35,000 
24,184

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 28-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 September 1987 
14. Milan, IL 
15. Red Rock Dam and 
Lake Red Rock, IA 
16. Rockford, IL 
17. Saylorville Lake, 
IA 
18 South Quincy, IL 
26. Hannibal, MO 
Loves Park, IL 
Moline, IL 
New Work: 
Approp. 
Cost 
Contributed Funds 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Contributed Funds 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Contributed Funds 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
3,530,000 
3,263,505 
213,950 
2,875,000 962,000 130,000 13,816,640 
2,464,332 566,240 1,017,500 13,203,735 
- - - 225,950 
201,554 - - 201,554 
- - - - 95,303,484 
- - - - 95,302,484 
2,712,000 3,018,300 3,004,600 2,638,322 27,485,645 
2,518,900 3,263,730 2,638,830 2,801,950 24,820,760 
475,000 
1,309,129 
104,200 
117,606 
2,500,000 
1,590,361 
3,173,000 
4,451,959 
221,989 
820,558 
1,100,000 309,000 1,086,000 
883,485 564,537 159,867 
391 
981 
5,313,000 
6,404,697 
2,681,500 
2,724,425 
408,352 
593,869 
48 - 
7,107,000 
3,631,688 
3,116,600 
3,032,005 
141,989 
141,745 
961,000 
4,740,366 
3,823,422 
3,362,400 
- 150,000 209,000 230,000 
- 138,466 218,160 231,040 
150,000 
134,787 
60,000 124,000 184,000 
80,692 117,693 119,421 
- 200,000 311,000 430,000 
- 187,644 303,507 297,233 
106,759 
90,000 
48,410 
-25,000 
12,715 
Muscatine Island, IA New Work: 
Approp. 
Cost 
West Des Moines, IA New Work: 
Approp. 
Cost 
260 
- 100,000 
- 25,843 
- 75,000 
10,054,273 
8,305,153 
249,361 
244,208 
110,787,887 
109,432,4328 
26,185,465 
22,525,210 
2,304,830 
1,951,401 
589,000 
587,666 
828,993 
758,047 
941,000 
788,384 
1,415,000 
1,407,875 
100,000 
25,843 
75,000 
1. Includes $25,000 Emergency Relief Funds. 
2. Includes $4,143,282 for Operating and Care under the "Permanent 
Indefinite Appropriation." 
3. Includes $2,569,102 for previous projects. 
4. Includes $1,028,468 for previous projects. 
5. Includes $85 for previous project. 
6. Includes cost of Mehaffey Bridge, $1,365,074 (excluding 
$100,000 contributed funds). 
7. Excludes $161,813 contributed funds. 
8. Excludes $950,000 non-Federal cost. 
28-10

ROCK ISLAND, IL, DISTRICT 
TABLE 28-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
January 21, 1927 
July 3, 1930 
June 26, 19341 
August 30, 1935 
August 30, 19353 
June 14, 1937 
June 20, 1938 
October 23, 1943 
March 2, 1945 
Rivers and Harbors 
Committee Doc. 69th Cong., 
1st sess., and S. Doc. 130, 
69th Cong., 1st sess. 
S. Doc. 126, 71st Cong., 
2nd sess. 
ILLINOIS WATERWAY, IL AND IN 
Channel 9 feet deep and 200 feet wide from mouth 
of Illinois River to Utica, 231 miles, modification 
of 2 U.S. locks and dams, removal of 2 State 
dams. (Act authorized appropriation of not to exceed 
$3,500,000 for carrying on work.) 
Channel 9 feet deep from Utica, IL, to heads of 
present Federal projects on Chicago and Calumet 
Rivers 94.6 miles to Lake Street, and 96.3 miles to 
turning basin 5, respectively, to be secured by means 
of completed dams, locks, lateral canals, and dredging 
begun by State of Illinois in general accordance with 
present plans of State for that work. Act adopting 
project authorized appropriation of not to exceed 
$7,500,000 for carrying on work. 
Operation and care of locks and dams provided for 
with funds from War Department appropriation for 
rivers and harbors. 
Construct modern locks and dams at LaGrange and 
Peoria and a channel 9 feet deep and 300 feet wide 
below Lockport, exact location and details of design 
of all structures to be left to discretion of Chief of 
Engineers, and, for time being, that no change be 
made in water authorized for navigation of Illinois 
River by act of July 3, 1930. 
Also provides for 3 passing places along Sag 
Channel and authorized channel in Calumet-Sag 
route to turning basin 5, and dredging at entrance of 
Lake Calumet. 
Realign portion of Calumet River and abandonment 
of bypassed section of Calumet River. 
Modifies local cooperation requirements in 1935 act. 
Pay damages to levee and drainage districts due to 
seepage and other factors, not to exceed $503,500. 
Enlarge Calumet-Sag Channel to 160 feet wide and 
a usable depth of 9 feet. Dredge a barge channel 160 
feet wide with a usable depth of 9 feet in Grand 
Calumet and Little Calumet River Branch of Indiana 
Harbor Canal to deep (lake) draft through 141st St., 
East Chicago, IN. Construct in Little Calumet River 
a lock of suitable dimensions for large navigation. 
Rebuild or otherwise alter at Federal expense all 
obstructive railroad bridges across Calumet-Sag 
Channel, Little Calumet River, Calumet River, Grand 
Calumet River, and Indiana Harbor Canal, so as to 
provide suitable clearance, except that no Federal 
funds shall be expended for removal or alteration 
of Illinois Central RR. bridge at mile 11.20 of Little 
Calumet River. 
28-11 
H. Doc. 184, 73rd Cong., 
2nd sess.2 
H. Doc. 180, 73rd Cong., 
2nd sess. 
Rivers and Harbors Committee 
Doc. 19, 75th Cong., 1st sess. 
H. Doc. 711, 77th Cong., 
2nd sess. 
H. Doc. 145, 76th Cong., 
1st sess.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 28-B (Continued) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
July 24, 1946 
July 24, 1946 
July 17, 1953 
July 3, 1958 
August 18, 1968 
November 17, 1986 
3. July 3, 1930 
5. August 15, 1985 
(P.L. 99-88) 
Substitute following work for that authorized by act 
of March 2, 1945; replace emergency dam in Chicago 
Sanitary and Ship Canal; enlargement of that canal 
thence to Sag Junction and of Calumet-Sag Channel 
to afford channels 225 feet wide and usable depth of 
9 feet; construct along general route depth of 9 feet 
to 225 feet wide between Little Calumet River and 
junction with Indiana Harbor Canal and 160 feet wide 
thence to Clark St., Gary, IN, with a turning basin at 
Clark St., enlarge Indiana Harbor Canal to 225 feet 
wide and usable depth of 9 feet between Grand 
Calumet River and vicinity of 141st St., inclusive; 
remove Blue Island lock and construct a lock and control 
works in Calumet River near its head, and 
similar structures in proposed Grand Calumet 
Channel west of Indiana Harbor Canal; alter or eliminate 
railroad bridges across three channels lakeward 
of Chicago Sanitary and Ship Canal, or construct 
new railroad bridges to provide suitable 
clearance. 
A small-boat harbor in vicinity of Peoria, IL, by 
construction of a basin 510 by 250 feet, dredged to 
7 feet deep. 
$48,933 to reimburse Nutwood Drainage and Levee 
District for additional pumping operation; supplementing 
$58,750 authorized in October 1943 act. 
Federal participation in alteration of highway 
bridges, Calumet-Sag Modification, Part I, which 
constitute unreasonable obstructions to navigation, in 
accordance with Public Law 647, 76th Cong., as 
amended. 
Federal participation in alteration of highway 
bridges, Calumet-Sag Modification, Part II, which 
constitute unreasonable obstructions to navigation, 
in accordance with Public Law 647, 76th Cong., as 
amended. 
Illinois River at Peoria, IL modification of navigation 
project to include an adjacent downstream water 
area. 
MILL CREEK AND SOUTH SLOUGH AT 
MILAN, IL 
Channel diversion, floodgates, and other work 
for flood protection. 
UPPER MISSISSIPPI RIVER SYSTEM 
ENVIRONMENTAL MANAGEMENT 
PROGRAM, IL, IA, MN, MO, WI 
Provide for a 10-year environmental program to 
include habitat rehabilitation and enhancement; longterm 
resource monitoring with computerized inventory 
and analysis; recreational development; assessment 
of economic benefits from recreational activities; 
and navigation system traffic monitoring. 
H. Doc. 677, 79th Cong., 
2nd sess. 
H. Doc. 698, 79th Cong., 
2nd sess. 
H. Doc. 144, 81st Cong., 
1st sess. 
H. Doc. 45, 85th Cong., 
1st sess.4 
Specified in Act. Also 
H. Doc. 45, 85th Cong., 
1st sess. 
Sec. 857, H:R.6, Water 
Resources Development 
Act of 1986. 
Rivers and Harbors 
Committee Doc. 19, 
71st Cong., 2nd sess. 
H. Doc. 2577, 99th Cong., 
1st sess. 
28-12

ROCK ISLAND, IL, DISTRICT 
TABLE 28-B (Continued) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
November 17, 1986 
8. October 27, 1965 
(P.L. 89-298) 
9. August 13, 1968 
10. June 28, 1938 
July 14, 1960 
11. December 31, 1970 
November 17, 1986 
12. August 15, 1985 
(P.L. 99-88) 
November 17, 1986 
13. 1944 Flood Control 
Act 
14. August 13, 1968 
15. June 28, 1938 
December 19, 1985 
16. October 23, 1962 
17. July 3, 1958 
October 22, 1976 
Approves 1982 Upper Mississippi River Master Plan, 
authorizes interstate agreements between Upper 
Mississippi River states, directs Secretary to implement 
GREAT II recommendations for disposal of 
dredged material and facilitate the productive use of 
dredge material, directs and interagency agreement 
with the Department of Interior for its participation in 
the plan, authorizes second lock at Lock and Dam No. 6. 
AMES DAM AND RESERVOIR, SKUNK 
RIVER, IA 
Reservoir for flood control, water quality 
control, recreation, and fish and wildlife. 
BETTENDORF, IA 
Levees, railroad raises, closure structures, and 
street raises and ramps for flood control. 
CORALVILLE LAKE, IA 
Reservoir for flood control and recreation. 
Highway bridge across Coralville Lake at or near 
the Mehaffey site. 
DAVENPORT, IA 
Levee, floodwall, and pumping plants. 
Davenport (Nahant Marsh), IA 
Land Acquisition 
DES MOINES RECREATIONAL RIVER AND 
GREENBELT, IA 
Recreational development; environmental enhancement; 
and related streambank stabilization. 
Defines area of work. 
FARM CREEK, IL 
Two flood detention dams and channel 
improvements. 
MILAN, IL 
Levee closure structures, gravity drainage outlets, 
ditches, ponding areas, and pumping plants for flood 
control. 
RED ROCK DAM AND LAKE RED ROCK, IA 
Reservoir for flood control and recreation. 
Land Acquisition 
ROCKFORD, IL 
Channel enlargement and realignment, levees, and 
appurtenant works for flood control. 
SAYLORVILLE LAKE, IA 
Reservoir for flood control and recreation. 
Modification to minimize adverse project impact on 
Ledges State Park. 
Sec. 1103, H.R.6, Water 
Resources Development 
Act of 1986. 
H. Doc. 267, 89th Cong., 
1st sess. 
H. Doc. 348, 89th Cong., 
2nd sess. 
Flood Control Committee 
Doc. 1, 75th Cong., 1st sess. 
None 
H. Doc. 161, 92nd Cong., 
1st sess. 
Sec. 601, H.R.6, Water 
Resources Development 
Act of 1986 
H. Doc. 2577, 99th Cong., 
1st sess. 
Sec. 604, H.R.6, Water 
Resources Development 
Act of 1986. 
H. Doc. 802, 78th Cong., 
2nd sess. 
H. Doc., 348, 90th Cong., 
2nd sess. 
Flood Control Committee 
Doc. 1, 75th Cong., 1st sess. 
PL 99-190 
S. Doc. 142, 87th Cong., 
2nd sess. 
S. Doc. 9, 85th Cong., 
1st sess. 
H. Doc. 487, 94th Cong., 
2nd sess. 
28-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 28-B 
(Continued) 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
SOUTH QUINCY DRAINAGE AND LEVEE 
DISTRICT, IL 
18. November 17, 1986 Raise existing levee, construct levees and floodwalls Sec. 401, H.R.6, Water 
raise road ramps and construct railroad closure. Resources Development 
Act of 1986. 
WATERLOO, IA 
19. October 27, 1965 Levees, floodwalls, pumping plants, and closure H. Doc. 166, 89th Cong. 
structures for flood control. 1st sess. 
November 17, 1986 (Bridges) Sec. 835, H.R.6, Water 
Resources Development 
Act of 1986. 
HANNIBAL, MO 
26. October 23, 1962 Levee, floodwall, closure structures, and pumping H. Doc. 564, 87th Cong., 
plant for flood control. 2nd sess. 
LOVES PARK, IL 
November 17, 1986 Improved channel, pumping plant and pond storage. Sec. 401, H.R.6, Water 
Resources Development 
Act of 1986. 
MOLINE, IL 
October 27, 1965 Levee, closure structures, and interior drainage H. Doc. 161, 92nd Cong., 
(Section 201) facilities for flood control, and aesthetic and 1st sess. 
Approved by recreational development. 
Committees on Public 
Works of House of 
Representatives and 
Senate, June 14, 1972, 
and June 21, 1972, 
respectively. 
MUSCATINE ISLAND LEVEE DISTRICT 
AND MUSCATINE-LOUISA COUNTY 
DRAINAGE DISTRICT, NO. 13, IA 
November 17, 1986 Raise existing levees. Sec. 401, H.R.6, Water 
Resources Development 
Act of 1986. 
WEST DES MOINES, IA 
November 17, 1986 Construct levees and floodwall. Sec. 401, H.R.6, Water 
Resources Development 
Act of 1986. 
1. Permanent Appropriations Repeal Act. 3. Included, in part, in Public Works Administration Program 
2. Contains latest published map of Illinois and Des Plaines October 31, 1934, and February 28, 1935. 
Rivers. 4. Contains latest published maps of Calumet-Sag portion. 
TABLE 28-C OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 6 of Text) 
For Last Cost To September 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Hannibal SBH, MO Completed 1958 108,7004 6,256 
Squaw Chute at Quincy, IL Completed 1967 70,9791 9,345 
Muscooten Bay, Illinois River, IL Completed 1985 265,4993 0 
Quincy, IL, Harbor Access Channel Completed 1970 35,4772 37,700 
Muscatine Harbor, IA Completed 1964 353,000 466 
1. Excludes $25,851 contributed funds. 
2. Excludes $35,350 contributed funds. 
3. Excludes $137,869 contributed funds. 
4. Excludes $20,300 contributed funds. 
28-14

ROCK ISLAND, IL, DISTRICT 
TABLE 28-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 21 of Text) 
Cost To September 30, 1987 
For Last 
Full Report Operation Contributed 
See Annual and Funds 
Project Report For Construction Maintenance Expended 
Completed Projects 
Banner Special Drainage and Levee Districts, IL 1943 274,822 - - 
Bear Creek Dam (City of Hannibal, MO) 1962 1,679,056 - - 
Big Lake Drainage and Levee District, IL 1943 144,910 - - 
Canton, MO' 1964 1,496,555 - - 
Clinton, IA 1981 26,001,996 - 761,050 
Coal Creek Drainage and Levee District, IL 1954 1,923,145 - - 
Crane Creek Drainage and Levee District, IL 1941 68,898 - - 
Des Moines and Mississippi Levee District 
No. 1, MO 1969 1,492,016 - - 
Des Moines, IA 1972 4,993,224 - 23,323 
Drury Drainage District, IL 1964 1,144,875 - - 
Dubuque, IA 1974 10,861,170 - 145,415 
East Liverpool Drainage and Levee District, IL 1941 207,826 - - 
East Moline, IL 1984 9,692,097 - - 
East Peoria Drainage and Levee District, IL 1946 279,963 - - 
Elkport, IA 1951 34,200 - - 
Evansdale, IA 1983 4,409,088 - - 
Fabius River Drainage District, MO 1941 60,500 - - 
Fabius River Drainage District, MO 1963 1,621,841 - - 
Farmers Levee and Drainage District, IL 1942 155,562 - - 
Fulton, IL 1984 18,017,200 - - 
Galena, IL 1952 844,100 - 118,000 
Green Bay Levee and Drainage District No. 2, IA 1949 299,000 - - 
Green Bay Levee and Drainage District No. 2, IA 1967 1,727,711 - - 
Gregory Drainage District, MO 1940 77,100 - - 
Gregory Drainage District, MO 1972 1,538,963 - 20,626 
Henderson County Drainage District No. 1, IL 1968 1,453,217 - - 
Henderson County Drainage District No. 2, IL 1968 1,043,902 - - 
Henderson County Drainage District No. 3, IL 1949 42,700 - - 
Hennepin Drainage and Levee District, IL 1940 109,593 - - 
Hunt Drainage District and Lima Lake Drainage 
District, IL 1972 4,772,498 - - 
Indian Grave Drainage District, IL 1972 3,551,961 - - 
Iowa River-Flint Creek Levee District No. 16, IA 1972 6,044,693 - - 
Kishwaukee River at DeKalb, IL' 1957 123,300 - - 
Lacey Langellier, West Mantanzas and Kerton 
Valley Drainage and Levee District, IL 1954 1,290,000 - - 
Liverpool Drainage and Levee District, IL 1943 117,731 - - 
Lost Creek Drainage and Levee District, IL 1938 152,000 - - 
Marengo, IA' 1981 2,447,001 - - 
Marion County Drainage District, MO 1967 873,748 - - 
Marshalltown, IA 1978 8,437,511 - 252,136 
Mason and Menard Drainage District, IL 1940 93,808 - - 
Meredosia Levee and Drainage District, IL' 1977 1,995,322 - 269,739 
Muscatine, Mad Creek, IA' 1983 1,129,800 - - 
Muscatine Island Levee District and Muscatine- 
Louisa County Drainage District No. 13, IA 1970 3,293,276 - 220,000 
Near Springfield on Sangamon River, IL 1941 - - - 
Oakford Special Drainage District, IL 1940 38,417 - - 
Okabena Creek at Worthington, MN1 1957 72,432 - - 
28-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 28-E 
(Continued) 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 21 of Text) 
Cost To September 30, 1987 
For Last 
Full Report Operation Contributed 
See Annual and Funds 
Project Report For Construction Maintenance Expended 
Ottumwa, IA 1977 233,145 - 
Pekin and La Marsh Drainage and Levee 
District, IL 1955 158,383 - - 
Penny Slough, Rock River, IL 1940 85,800 - - 
Rock Island, IL 1979 7,582,373 - - 
Rocky Ford Drainage and Levee District, IL 1941 108,797 - - 
Sabula, IA 1958 411,915 - - 
Sangamon River (Mouth), IL 1980 1,048,990 272,848 15,122 
Seahorn Drainage and Levee District, IL 1945 32,281 - 
Sid Simpson Project, IL 1968 5,789,800 - - 
Sny Basin, IL 1972 14,003,560 - - 
Sny Island Levee Drainage District, IL 1942 61,400 - - 
Sny Island Levee Drainage District, IL 1968 4,956,749 - - 
South Beardstown and Valley Drainage and 
Levee District, IL 1942 220,729 - - 
South Beardstown Drainage and Levee District, IL 1942 171,839 - - 
South Quincy Drainage and Levee District, IL 1940 61,200 - - 
South Quincy Drainage and Levee District, IL 1968 1,231,243 - - 
South River Drainage District, MO 1941 55,300 - - 
South River Drainage District, MO 1966 1,106,056 - - 
Spring Lake Drainage and Levee District, IL 1941 185,980 - - 
Subdistrict No. 1 of Drainage Union No. 1 and Bay 
Island Drainage and Levee District No. 1, IL 1967 3,306,695 - - 
Union Township Drainage District, MO 1947 116,576 - - 
Van Meter, IA1 1965 113,842 - - 
Authorized Projects Not Constructed 
Peoria, IL 1973 534,580 - - 
Rock River Agricultural Levees, IL 1984 858,000 - - 
1. Authorized by Chief of Engineers (Sec. 205, 1948 Flood Control Act). 
28-16

ROCK ISLAND, IL, DISTRICT 
TABLE 28-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report For Deauthorized Expended Expended 
Cal.-Sag Channel, Part II 
Illinois Waterway, IL and IN 1986 1986 - - 
Campbells Island 
Mississippi River, IL 1969 1979 $ 76,664 - 
Carroll County Levee 
and Drainage District, IL 1938 1977 - - 
Central City Lake, 
Wapsipinicon River, IA 1970 1977 55,664 - 
Farmers Drainage and Levee 
District (Sangamon River), IL 1942 1986 - - 
Freeport, IL 1979 1986 286,000 - 
Green Island Levee and 
Drainage District, IA 1938 1977 - - 
Henderson River, IL 1964 1977 102,310 - 
Illinois Waterway, IL and IN 
Duplicate Locks 1982 1981 - - 
Illinois Waterway 
Navigation Project (Pekin, IL) 1986 1986 - - 
Janesville and Indian 
Ford Dams, WI 1938 1977 - - 
Keithsburg Drainage 
District, IL 1938 1977 - - 
Pecatonica River at 
Darlington, WI - 1977 - - 
Rochester Lake, 
Cedar River, IA - 1977 - - 
South Beloit, IL 1979 1986 270,000 - 
William L. Springer Lake 
Decatur, IL 1979 1986 - - 
TABLE 28-H INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 20 of Text) 
Date 
Project Inspected 
Alpine Dam and Page Park Dam, Rockford, IL 
Banner Special Drainage and Levee District, IL 
Bear Creek Reservoir, Hannibal, MO 
Big Lake Drainage and Levee District, IL 
Burlington, IA 
Canton, MO 
Clinton, IA 
Coal Creek Drainage and Levee District, IL 
Crane Creek Drainage and Levee District, IL 
DeKalb, IL 
Des Moines, IA 
Des Moines and Mississippi Levee District No. 1, MO 
Drury Drainage District, IL 
Dubuque, IA 
October 1986 
November 1986 
March 1987 
January 1987 
November 1986 
December 1986 
September 1986 
November 1986 
November 1986 
October 1986 
October 1986 
March 1987 
December 1986 
September 1986 
28-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 28-H 
(Continued) 
Project 
INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 19 of Text) 
Date 
Inspected 
East Liverpool Drainage and Levee District, IL 
East Moline, IL 
East Peoria Drainage and Levee District, IL 
East Peoria Sanitary District, IL 
Elkport, IA 
Evansdale, IA 
Fabius River Drainage District, MO 
Farmers Drainage and Levee District, IL 
Fultin, IL 
Galena, IL 
Green Bay Levee and Drainage District, No. 2, IA 
Gregory Drainage District, MO 
Henderson County Drainage District No. 1, IL 
Henderson County Drainage District No. 2, IL 
Hennepin Drainage and Levee District, IL 
Hergot Drainage and Levee District, IL 
Hunt Drainage District & Lima Lake Drainage District, IL 
Indian Grave Drainage District, IL 
Iowa River-Flint Creek Levee District No. 16, IA 
Kerton Valley Drainage and Levee District, IL 
Lacey Drainage and Levee District, IL 
Langellier Drainage and Levee District, IL 
Liverpool Drainage and Levee District, IL 
Lost Creek Drainage and Levee District, IL 
Mad Creek, Muscatine, IA 
Marengo, IA 
Mason and Menard Drainage District, IL 
Marion County Drainage District, MO 
Marshalltown, IA 
Meredosia Levee and Drainage District, IL 
Milan, IL1 
Muscatine Island, L&DD, & Louisa DD No. 13, IA 
Oakford Special Drainage and Levee District, IL 
Pekin-LaMarsh Drainage and Levee District, IL 
Penny Slough Drainage and Levee District, IL 
Rock Island, IL 
Sabula, IA 
Sanitary District of Beardstown, IL 
Seahorn Drainage and Levee District, IL 
Sny Island Levee Drainage District, IL 
South Beardstown Drainage and Levee District, IL 
South Quincy Drainage and Levee District, IL 
South River Drainage District, MO 
Spring Lake Drainage and Levee District, IL 
Subdistrict No. 1 of Drainage Union No. 1, 
and Bay Island Levee and Drainage District No. 1, IL 
The Sny Basin, IL 
Valley Drainage and Levee District, IL 
Van Meter, IA 
Volga, IA 
January 1987 
November 1986 
November 1986 
January 1987 
September 1986 
November 1986 
December 1986 
November 1986 
November 1986 
September 1986 
November 1986 
December 1986 
December 1986 
December 1986 
November 1986 
December 1986 
April 1987 
December 1986 
December 1986 
February 1987 
February 1987 
February 1987 
October 1986 
November 1986 
November 1986 
November 1986 
November 1986 
March 1987 
November 1986 
September 1986 
November 1986 
December 1986 
November 1986 
December 1986 
October 1986 
November 1986 
September 1986 
November 1986 
February 1987 
March 1987 
November 1986 
March 1987 
March 1987 
November 1986 
November 1986 
April 1987 
November 1986 
October 1986 
September 1986 
28-18

ROCK ISLAND, IL, DISTRICT 
TABLE 28-H 
(Continued) 
INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(See Section 20 of Text) 
Date 
Project Inspected 
Waterloo, IA November 1986 
West Matanzas Drainage and Levee District, IL February 1987 
Worthington, MN August 1986 
1. Project partially completed. 
TABLE 28-I FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
Flood Control Activities Pursuant to Section 205, Public Law 
858, 80th Congress, as Amended (Preauthorization) 
(See Section 22 of Text) 
Study Identification Fiscal Year Costs 
Cedar Falls, Cedar River, IA $ 44,898 
Cedar River, Waverly, IA 26,808 
Couler Valley, Dubuque County, IA 77 
DeKalb, Kishwaukee River, IL 23,953 
Illinois, and Michigan Canal, IL 7,500 
Illinois River, Liverpool, IL 91,965 
Iroquois River, Sugar Creek, Watseka, IL 99,365 
North River, Marion County, MO 51,696 
Oelwein, Fayette County, IA 4,647 
Ottawa, IL 93,046 
Panther Creek, Sangamon River, Chandlerville, IL 1,769 
Plainfield, IA 19,367 
Raccoon River, Des Moines, IA 56,451 
Sac and Fox Indian Lands, Tama, IA 7,500 
Tama, IA 38,656 
Vermilion River, Pontiac, IL 148,100 
Walnut Creek, Clive, IA 38,904 
TABLE 28-I Snagging and Clearing Navigable Streams and 
Tributaries in the Interest of Flood Control (Preauthorization) 
(Section 208, 1954 Flood Control Act, Public Law 780, 83rd Congress) 
Project and Location Fiscal Year Costs 
Lower Edwards River, IL $ 7,500 
Negro Creek, Bureau County, IL 142 
Rock Creek, Morrison, IL 4,216 
28-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 28-I FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
(Continued) Emergency Bank Protection (Section 14 of 
the 1946 Flood Control Act, Public Law 526, 79th Congress) 
Project and Location Fiscal Year Costs 
320 St. N. Rock River, Rock Island, IL $ 44,196 
Buena Vista, IA 3,191 
Bureau County, Spring Valley, IL 7,500 
Des Moines River, Bridge 32527, MN 7,500 
Iowa Falls, River Road, IA 7,500 
Iowa River, Wapello, IA 14,601 
Jasper County, IA 1,200 
Middle River, Adair County, IA 14,301 
Mississippi River, Hannibal, MO 7,500 
North River, Klien Bridge, MO 5,305 
Sangamon River, Riverton, IL 9,642 
Shell Rock River, Cerro Gordo County, IA 7,500 
Shellsburg, Wildcat Creek, IA 7,500 
Stuart, IL 7,042 
Tama, IA 6,000 
Turkey River, Elgin, IA 5,574 
Turkey River, Jefferson Township, IA 53,885 
Turkey River, Millville Township, IA 41,684 
TABLE 28-I Emergency Flood Control Activities - Repair, Flood Fighting, and 
Rescue Work (Public Law 99, 84th Congress and Antecedent Legislation) 
(See Section 22 of Text) 
Project and Location Federal Cost 
Advance Preparation $ 48,008 
Rehabilitation: 
Bill Meyer-Connell-Cullinon, IL 20,447 
Blout-Lundry Levee, IL 11,143 
Cassell Levee, IL 28,180 
Glueck Levee, IL 7,268 
Green Island, Levee Drainage District I, IL 79,882 
Hoffman Levee, IL 24,229 
Iungerich -3-Fluegel Levee, IL 22,962 
John Reiff Levee, MO 22,795 
Judy-Dunham, et al Levee, IL 70,430 
Mississippi-Fox River Drainage District -2 Levee, MO 39,489 
Mississippi-Fox DD-2, Honey & Sugar Creek, MO 14,551 
28-20

ROCK ISLAND, IL, DISTRICT 
TABLE 28-J ILLINOIS WATERWAY: 
EXISTING LOCKS AND DAMS 
(See Section 2 of Text) 
Depth on 
Dimensions Miter Sills 
at Low Water 
Available Lift at 
Miles Width of Length for Low 
Above Chamber Full Width Water1 Lower Upper 
Lock Mouth Miles to Nearest Town (feet) (feet) (feet) (feet) (feet) 
LaGrange Lock 80.2 7.8 below Beardstown, IL 110 600 10.0 13.0 15.5 
Peoria Lock 157.7 4.1 below Peoria, IL 110 600 11.0 12.0 15.5 
Starved Rock Lock 231.0 Utica, IL 110 600 18.5 14.0 16.8 
Marseilles Lock 244.6 Marseilles, IL 110 600 24.45 14.0 18.6 
Dresden Island Lock 271.5 8 above Morris, IL 110 600 21.75 12.25 16.85 
Brandon Road Lock 286.0 Joliet, IL 110 600 34.0 13.8 17.85 
Lockport Lock 291.1 Lockport, IL 110 600 30.5-39.52 15.0 11.0-20.02 
T.J. O'Brien Lock 326.5 Chicago, IL 110 1,000 - 14.0 14.0 
1. Lifts and depth on miter sills are those obtained with 2. Variation in lift and depth on upper miter sill at 
flat pools. Lockport is due to fluctuation of water surface in the sanitary 
district canal. 
TABLE 28-K ILLINOIS WATERWAY, IL AND IN 
LOCK AND DAM CONSTRUCTION, FOUNDATIONS, COST 
(See Section 2 of Text) 
Lock Dam Estimated 
Federal Cost 
Under 
Type of Character of Type of Character of Year Existing 
Name Construction Foundation Kind Construction Foundation Complete Project 
Illinois River, 
mouth to Utica; 
channel improvement 
by dredging 
in Illinois River 
below Starved Rock 
modification of two 
U.S. locks and 
dams, and removal 
of two State dams. 
LaGrange 
Peoria 
Starved Rock 
Marseilles 
Concrete Piles in sand 
Concrete Piles in sand 
Concrete Rock 
Concrete Rock 
Movable 
(wicket 
with Aframe-
crest) 
Movable 
(wicket 
type) 
Movable 
(tainter 
gates) 
Movable 
(tainter 
gates) 
$ 2,733,4991 
2,744,5921 
3,381,0301 
885,3151 
1,853,7251 
Concrete 
and timber 
Concrete 
and timber 
Concrete 
and 
structural 
steel 
Concrete 
and 
structural 
steel 
Piles in sand 
Piles in sand 
Rock 
Rock 
1939 
1939 
1933 
1933 
28-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 28-K 
(Continued) 
ILLINOIS WATERWAY, IL AND IN 
LOCK AND DAM CONSTRUCTION, FOUNDATIONS, COST 
(See Section 2 of Text) 
Lock Dam Estimated 
Federal Cost 
Under 
Type of Character of Type of Character of Year Existing 
Name Construction Foundation Kind Construction Foundation Complete Project 
Dresden Island Concrete Rock Movable Concrete Rock 1933 $ 2,503,3761 
(tainter and 
gates) structural 
steel 
Brandon Road Concrete Rock Movable Concrete Rock 1933 2,031,6831 
(tainter and 
gates) structural 
steel 
Lockport Concrete Rock Movable Concrete Rock 1933 133,6081 
(Bear trap) and 
(Bear trap) structural 
steel 
T.J. O'Brien Concrete Piles in clay Fixed Concrete Piles in clay 1960 6,954,7001 
and sheet and sheet 
piling piling 
Lock and dam - - - - - - 1,250,3041 
equipment 
Total locks - - - - - - $ 24,471,832 
and dams 
1. Actual cost. 
TABLE 28-L ILLINOIS WATERWAY, IL AND IN 
ADDITIONAL FEATURES ENTERING INTO COST 
(See Section 2 of Text) 
Dredging: 
Little Calumet and Calumet Rivers $ 2,135,3581 
Calumet-Sag, 3 passing places 813,4181 
Starved Rock to Lockport 3,650,635 
Starved Rock to Grafton 2,917,607 
Calumet-Sag Channel 19,238,200 
Peoria small boat harbor 24,9371 
Protection piers at all locks 77,613' 
Calumet-Sag modification engineering and design 5,141,474 
Calumet-Sag modification, supervision and administration 5,466,804 
Rebuild highway bridges 19,327,850 
Rebuild railway bridges: 
Calumet-Sag Channel 20,828,4351 
Little Calumet and Calumet Rivers 18,362,0411 
Recreation Facilities, Code 711 445,000 
Removal of Blue Island lock 288,6001 
Grand Calumet River controlling works2 
St. Louis District 1,724,170' 
Total additional features $100,442,142 
Total existing project $124,913,974 
1. Actual cost. 2. Placed in inactive status November 19, 1974. 
28-22

ROCK ISLAND, IL, DISTRICT 
TABLE 28-M EXISTING PROJECT 
See 
Section 
in Text Project Item Length (feet) Width (feet) Depth (feet) 
2. Illinois Waterway, Nine locks and six dams 
IL and IN 
Grafton to Lockport, IL 291.1 miles 300 9 
Lockport to controlling works 2.0 miles 200-300 9 
Controlling works to junction with 10.0 miles 225 9 
Calumet-Sag Channel 
Calumet-Sag Channel to lock in Blue 16.0 miles 225 9 
Island 
Calumet and Little Calumet Channel, 7.7 miles 300 9 
from Blue Island to turning basin 5 
Grand Calumet River Channel from 9.0 miles 9 - 
junction with Little Calumet River 
to and in Indiana Harbor Canal to 
141st, East Chicago, IN 
Also, Grand Calumet River Channel 4.2 miles 160 9 
from junction of Indiana Harbor 
Canal and Grand Calumet River to 
Clark St. in Gary, IN, with a turning 
basin at Clark St. 
A channel in Chicago Sanitary and 22.1 miles 175-300 9 
Ship Canal and South Branch 
Chicago River from Sag-Junction to 
Lake St. in Chicago, IL 
TABLE 28-N ILLINOIS WATERWAY, IL AND IN 
TOTAL COST OF EXISTING PROJECT 
TO SEPTEMBER 30, 1987 
(See Section 2 of Text) 
New Work Maintenance Rehabilitation Total 
Regular Funds $118,317,646 $235,448,893 $103,428,239 $457,194,778 
Public Works Funds 3,960,735 - - 3,960,735 
Emergency Relief Funds 1,858,936 - - 1,858,936 
Total $124,137,317 $235,448,893 $103,428,239 $463,014,4491 
1. Includes $1,735,890 expended between 1927 and 1936 on the 
operation and care of the works of improvement under the provisions 
of the permanent indefinite appropriation for such purposes. 
28-23

MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND MINNEAPOLIS, MN * 
Section of river covered in this report is divided into three 
reaches, under supervision and direction of District Engineers 
at St. Louis, Rock Island, and St. Paul. Section in St. Louis 
District extends 105 miles from Mouth of Missouri River to 
Location. Mississippi River rises in northern part of 
Minnesota, flows about 2,360 miles southerly and empties 
into Gulf of Mexico. Portion included in this report extends 
about 663 miles from mouth of Missouri River to Soo Line 
Railroad bridge, Minneapolis. Latest map and profile showing 
this section of river is in House Document 669, 76th Congress, 
3d session. A map showing Lake Pepin is in House 
Document 511, 79th Congress, 2d session. A map of section 
Minneapolis to Dubuque is in House Document 515, 79th 
Congress, 2d session. A map showing location of drainage 
districts (Bellevue, Iowa, to Missouri River) is in River and 
Harbors Committee Document 34, 75th Congress, 1st session. 
Previous projects. See page 1199 of Annual Report for 
1963. 
Existing project. Provides for a channel of 9-foot depth 
and adequate width between mouth of Missouri river (1,179 
miles from the gulf) and Soo Line Railroad at Minneapolis, 
by construction of a system of locks and dams, supplemented 
by dredging. Project also provides for further improvements 
at St. Paul to provide a basin extending downstream from 
Robert Street Bridge of 2.7 miles, and at Minneapolis to provide 
adequate terminal facilities, and for other harbor improvements 
and miscellaneous work. Pertinent data on locks 
and dams, harbor improvements, additional features entering 
into cost of project, and authorizing legislation are given 
in Tables 29-C, 29-D, 29-E and 29-G. All dams are concrete. 
Three dams (Upper St. Anthony Falls, 1 and 19) are fixed, 
remainder are movable. See House Document 669, 76th Congress, 
3d session, for a report of Chief of Engineers dated 
February 27, 1940, containing a general plan for improvement 
of Mississippi River between Coon Rapids Dam and 
mouth of Ohio River for purposes of navigation, power 
development, flood control, and irrigation needs. 
Local cooperation. Small-boat harbors authorized in the 
River and Harbor Act of 1962 are subject to conditions that 
local interests make a cash contribution toward cost of construction 
(except in case of Quincy Harbor which involves 
maintenance only of an existing harbor); furnish lands and 
rights-of-way for construction and future maintenance; hold 
the United States free from damages; provide and maintain 
mooring facilities and utilities; reserve accommodations for 
transient small boats; accomplish all necessary relocations 
and alterations; and establish public bodies empowered to 
Upper Mississippi River mile 300 above Ohio River; Rock 
Island District extends about 314 miles from mile 300 to 614; 
and St. Paul District extends about 244 miles from mile 614 
to Soo Line Railroad bridge, Minneapolis (mile 857.6). 
regulate use, growth and development of the harbors. 
Rectification of seepage damages to privately owned lands 
in the Sny Island Levee Drainage District, IL, is subject to the 
conditions that local interests acquire all lands, easements, 
and rights-of-way necessary for construction and maintenance 
of the project; comply with applicable provisions of the 
Uniform Relocation Assistance and Real Property Acquisition 
Policies Act of 1970; accept, operate, and maintain the project 
upon its completion; and hold and save the United States free 
from damages arising from the construction and operation of 
the completed project; provided further that the local public 
entity shall be reimbursed by the Government in the amounts 
actually expended by it in the acquisition of real estate and 
for payments required under Public Law 91-646 if said 
amounts have been previously submitted to and approved by 
the Government. 
Local cooperation requirements have been complied with 
for improvement of commercial harbor at Dubuque, IA; for improvement 
of Beaver Slough at Clinton, IA, for navigation; 
and for general navigation facilities at small-boat harbors at 
Rock Island, IL; Hannibal, MO; Fort Madison, IA; Davenport 
(Lindsay Park), IA; Muscatine, IA (including freight terminal 
approach channel); Andalusia, IL; Warsaw, IL; Moline, IL; 
Clinton, IA; and Savanna, IL. 
Licenses. Federal Energy Regulatory Commission 
collects from non-Federal licensees annually to recompensate 
the United States for use of government dams for generation 
of hydroelectric power. Amounts collected are returned to U.S. 
Treasury. (See table at end of chapter for license fees collected 
through the end of the fiscal year.) 
Operations during fiscal year. St. Paul District. New 
Work: Under Section 107 authority, an initial appraisal was 
completed at Harriet Island, MN at a cost of $7,500. Studies 
were continued under Section 107 for the establishment of a 
small-boat harbor at Guttenberg, Iowa at a cost of $1,855. 
Total new work costs were $9,355. 
Maintenance: Channel dredging to remove shoal areas 
was performed. Government pipeline dredge WILLIAM A. 
THOMPSON removed 882,802 cubic yards of material at 16 
locations at a cost of $1,787,324. Government derrick barge 
HAUSER removed 20,573 cubic yards of material at 4 locations 
for $266,455. Government pipeline dredge DUBUQUE 
29-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
removed 319,867 cubic yards at 17 locations at a cost of 
$458,486. Mechanical dredging contract costs were $865,476. 
Contracts for dredge material removal, dredging at Weaver 
Bottoms, and Pool 1 site preparation cost $2,400,688, 
$3,667,098, and $229,966, respectively. Dredging surveys cost 
$486,858. Other dredging and snagging cost $183,361. Water 
quality testing for dredging cost $68,019. Painting at locks 
and dams cost $566,374. Scour repair contracts at Locks and 
Dams 2, 5A, and 10 cost $311,476, $435,439 and $149,584, 
respectively. Contracts for dike repair at Lock and Dam 3, and 
for general dam maintenance cost $212,328 and $74,220, 
respectively. Contracts for construction of handicapped 
facilities at Lock and Dam 9, for loading dock at Lock and 
Dam 5, for foundation investigations at Lock and Dam 2, and 
for aluminum grating at Lock and Dam 4 cost $15,938, 
$29,030, $167,769, and $23,494, respectively. Road repair contracts 
at Locks and Dams 1, 4, and 7 cost $23,529, $19,635 
and $22,902, respectively. Supply and equipment contracts 
for lock operating machinery at Locks and Dams 2, 4, 5, and 
10, for tow haulage units at Locks and Dams 2 and 4-10, for 
rehabilitation of Lock and Dam 2, for equipment replacement, 
for electronic positioning equipment, for computer processing 
equipment, and for processing and channel sweeping 
system cost $3,889,999, $421,773, -$184,077, $45,854, 
$175,039, -$80,000, and $123,425, respectively. Contracts for 
construction of storage building at Lock and Dam 5A and for 
major maintenance at Lock and Dam 3 cost $191,036 and 
$18,310, respectively. Maintenance costs for the small-boat 
harbors at Lake City, St. Paul and Winona, MN were $57,786, 
$30,000, and $5,000, respectively. Other miscellaneous hired 
labor, supplies, and equipment cost $3,283,583. Engineering 
work and miscellaneous surveys, reports, and other work were 
carried on by hired labor for $1,581,792 and by contract for 
$955,124. The total cost of maintenance was $22,980,093. 
Rehabilitation: A lock supply contract for Locks and 
Dams 3 and 5A-9, and a supply contract for roller gate chains 
cost $2,159,999 and $405,522, respectively. Engineering, 
administration, and other work were carried on by hired labor 
for $272,354 and by contract for $83,238. Total rehabilitation 
costs were $2,921,113. 
Operating and care: Locks and dams were operated as 
required, and necessary repairs were made to those and 
appurtenant structures. Other studies, reports, and miscellaneous 
engineering work were also accomplished. Total cost 
of operating and care was $10,049,435. 
Costs to St. Paul District were $9,355 for new work; 
$33,029,528 for operation and maintenance; and $2,921,113 
for rehabilitation, for a total of $35,959,996. 
Rock Island District. New Work: Work continued on 
Stage 1, Rock Excavation, in Pool 15 with 23,000 cubic yards 
of rock and overburden being removed by contract at a cost 
of $913,600. 
Maintenance: Channel dredging by Government cutterhead 
pipeline dredge WILLIAM A. THOMPSON was performed 
at various locations in Pools 16, 17, 21, and 22 at a cost 
of $1,373,800 with 621,889 cubic yards of material being 
removed. Contractor dredged various locations in Pool 22 at 
a cost of $165,000 with 46,111 cubic yards of material being 
removed. Dredging inspection and reports were completed at 
a cost of $60,600. Snagging, clearing, and excavation was performed 
by hired labor at various locations at a cost of 
$116,100. Dredged material disposal activities and other 
environmental concerns in connection with dredging and 
channel maintenance activities cost $67,500. Repair of channel 
regulating works structures was performed at a cost of 
$1,648,400. Structural repairs, including sandblasting and 
painting, were performed by hired labor at locks and dams at 
a cost of $897,200. Contractor initiated repairs to undermined 
land guidewalls at Locks 12, 13, and 17 at a cost of $1,135,900. 
Repairs to the upper land guidewall damaged by a towboat 
at Lock 17 were completed by contract at a cost of $113,300. 
Small boat launching ramps were constructed at Clark's 
Ferry and Shady Creek Public Use Area at a cost of $61,800. 
Construction of public restroom facilities and access road improvements 
were initiated by contract at Lock and Dam 11 
at a cost of $90,000. Final payments totaling $5,500 were 
made on two contracts physically completed in prior fiscal 
year. Contractor completed installation of upper bulkhead 
recesses at Locks and Dams 21 and 22 at a cost of $35,300. 
Maintenance of roads and bridges, and of buildings, grounds 
and utilities cost $56,400. Maintenance of public use areas 
was performed at a cost of $551,300, and maintenance and 
purchase of permanent operating equipment cost $260,100. 
Maintenance of levees cost $81,700. Real estate activities 
relating to maintenance cost $31,900. Engineering and 
design work was performed at a cost of $442,600. Supervision 
and administration for maintenance features cost $464,100. 
Total maintenance costs were $7,658,500. Net credits to the 
project were $412,100, primarily as a result of collection of 
damages from towboat companies to lock and dam structures. 
Operating and care: Operation of locks and dams and 
routine maintenance and minor repairs thereto were performed 
at a cost of $8,972,800. Real estate management services 
were performed at a cost of $143,700. Natural and cultural 
resource activities cost $374,000, and public use areas and 
Mississippi River Visitor's Center were operated at a cost of 
$921,500, with contract law enforcement provided at a cost 
of $55,500. Surveys, various condition and operation studies, 
and structural inspections cost $1,043,900. Water control 
management costs were $701,100; amount of $20,000 was 
expended on Master Plans; and $8,300 was expended on 
various investigations and reports. Supervision and administration 
for operations features cost $248,600. Total operation 
costs were $12,489,400. 
Total operation and maintenance costs were $19,735,800. 
Rehabilitation: Rehabilitation for Lock and Dam 20 cost 
$7,974,065; rehabilitation was initiated at Locks and Dams 
21 and 22 at a cost of $407,120 and $981,105, respectively. 
Total rehabilitation costs were $9,362,290. 
Costs to Rock Island District were $913,600 for new work; 
$19,735,800 for operations and maintenance; and $9,362,290 
29-2

MISSISSIPPI RIVER BETWEEN MISSOURI AND MINNEAPOLIS, MN 
for major rehabilitation for a total of $30,011,690. 
St. Louis District. New work: Costs incurred for new 
Lock and Dam 26 were $856,295 for real estate acquisition, 
$7,195,257 for relocations, $6,834,230 for the dam, 
$53,650,396 for the lock, $537,051 for channels, $814,870 for 
levees and floodwalls, $18,728 for buildings and utilities, 
$57,242 for permanent operating equipment, $3,211,117 for 
engineering, and $5,219,892 for supervision and administration. 
Costs incurred for 2nd lock were $502,830 for the lock, 
$3,899,526 for engineering and $204,448 for supervision and 
administration. Total cost of new work was $83,001,882. 
Operating and care: The locks and dams were operated 
as required, and necessary repairs were made thereto and to 
appurtenant structures at a cost of $3,459,382. 
Costs to St. Louis District were $83,001,882 for new work 
and $7,635,785 for operation and maintenance for a total of 
$90,637,667. 
Condition at end of fiscal year: For information pertaining 
to locks, dams and harbors, see tables at end of 
chapter. 
St. Paul district. Work completed: Locks and Dams at 
St. Anthony Falls and 1 to 10, inclusive, except for relatively 
minor appurtenant work; major improvements of channels 
and harbors at St. Paul and Minneapolis; commercial harbors 
at Lake City; Red Wing, and Winona, MN; and Prairie du 
Chien, WI; small-boat harbors at St. Paul, Hastings, Red 
Wing, Wabasha, Lake City and Winona, MN; Lansing, IA; 
and Bay City, Pepin, and Prairie du Chien, WI; a remedial 
drainage ditch at Cochrane, WI; miscellaneous channel dredging 
and realignment; channel markers; pool clearing; and construction 
of various facilities for recreation use. Seepage 
damages totaling $90,027 were paid to 210 claimants. 
Status of land and flowage acquisition: Approximately 
50,293.54 acres of land in fee, including 47,305 acres used by 
the Department of the Interior in accordance with a 
cooperative agreement and general plans, and easements of 
15,549.63 acres of land are owned or controlled in pools 1 to 
10, inclusive, at end of fiscal year. In addition, fee title to 12.46 
acres and perpetual easements on 2.98 acres of land for St. 
Anthony Falls and perpetual easements over 244.39 acres of 
land for harbors have been obtained and Department of the 
Army holds special rights over 62,954.74 acres owned by 
Department of the Interior in pool Nos. 3 to 10, inclusive. Land 
acquisition is complete. 
Work remaining to complete portion of project in St. 
Paul District: Construction of small boat harbor at St. Paul 
(Harriet Island), MN and construction of additional recreational 
facilities. Uncompleted guidewall extensions at Lock 
Nos. 3, 4, 5, 5A, 7, 8, 9, and 10 were deauthorized by 1986 
Water Resources Development Act. 
Condition of channel at end of fiscal year was such that controlling 
depths of 9 feet at low water and minimum widths 
for long-haul common carrier service were available in all 
pools. Structures are in good condition. 
Rock Island District. Work completed: Major construction 
items, including all locks and dams, are completed and 
in operation. The following related work has also been completed: 
Construction of small-boat harbors at Rock Island, IL; 
Moline, IL; Andalusia, IL; Warsaw, IL; Fort Madison, IA; 
Davenport (Lindsay Park), IA; Muscatine, IA; Clinton, IA; and 
Hannibal, MO; improvement of Beaver Slough at Clinton, IA, 
for navigation; improvement of commercial harbor at Dubuque, 
IA; rehabilitation of old auxiliary lock at Lock and Dam 
14; permanent closure of old Lock 19 and drydock; rock and 
conglomerate excavation in Pool 16; rectification of seepage 
damage in the Sny Island Levee Drainage District, IL; recreational 
facilities; and construction of visitor center at Lock 15. 
Status of land and flowage acquisition: Acquisition of 
land in Pools 11 to 22, inclusive consisting of 93,601 acres in 
fee and 10,541 acres in flowage easement, has been completed. 
Condition of the channel at end of fiscal year, was such that 
controlling depths of 9 feet at low water and widths suitable 
for long-haul common carrier service were being maintained 
in all pools. 
Work remaining to complete portion of project in Rock 
Island District: Construction ofguidewall extension at 16, 
18, and 21; mooring facilities at 11, 12, 14, 15, 16, 17, and 18; 
upper approach improvement at 19 and 20; rock and/or congolmerate 
excavation in Pools 14, 15, 18, and 21. Small-boat 
harbors at New Boston, IL, Bellevue, IA, Cassville, WI, Davenport 
(Credit Island), IA, and Keokuk, IA are inactive, deferred 
or have been deauthorized. 
St. Louis District. Work completed: Locks and Dams 24, 
25, and 26 (Henry T. Rainey Dam), except for guidewall extensions 
at Locks 24 and 25, have been completed as have 
recreation facilities at the three pools. Payments for rectification 
of damages have been completed. Other work remaining 
consists of construction guidewall extensions at Locks 24 and 
25. Replacement of Lock and Dam 26 is under construction. 
Status of land and flowage acquisition: Acquisitions 
of lands in Pools 24, 25, and 26, involving 4,448 acres of land 
in fee and flowage easements over 6,600 acres, is complete. 
A total of 1,742 acres have been acquired for Lock and Dam 
26 replacement project. 
Condition of channel at end of fiscal year was such that controlling 
depth of nine feet at low water and generally suitable 
widths for long-haul common carrier services were maintained 
in all pools and between Locks and Dam, 26 and Missouri 
River. 
Work remaining to complete portion of project in St. 
Louis District: Work remaining on the Lock and Dam No. 
26 (replacement) project includes completion of the second 
stage, the 1200 foot lock and two half gatebays of the dam, and 
the third stage, the 600 foot lock and 1 gatebays of the dam. 
Other work includes removal of the existing lock and dam, 
rerouting a railroad, and construction of the administration/
maintenance building and Visitor Center. Approximately 
1,880 acres remains to be acquired, of which 1,331 
acreas are for mitigation purposes for terrestrial wildlife loses. 
'IbTotal Federal costs of existing project to end of fiscal year 
for the three Districts was $146,559,918 of which $83,924,837 
was for new work, $50,351,678 regular funds for operation and 
maintenance and $12,283,403 regular funds for 
rehabilitation. 
29-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 29-A COST AND FINANCIAL STATEMENT 
Total Cost to 
Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
Mississippi River New Work' 
between Missouri River Approp.2 38,441,000 85,053,000 84,345,770 102,998,100 754,205,003 
and Minneapolis, Cost3 42,157,597 84,591,964 86,217,056 83,924,837 735,611,399 
Minnesota (Federal Maint.4 
Funds) Approp. 51,692,401 52,296,749 56,548,589 59,089,429 782,841,054 
Cost 60,514,185 53,051,295 52,409,293 50,351,678 760,868,379 
Rehab. 
Approp. 0 0 1,240,000 12,950,000 71,723,197 
Cost. 99,623 1,797 1,185,900 12,283,403 71,002,500 
(Contributed funds) New Work 
Approp. 512,160 -99,561 0 0 2,041,140 
Cost 774,696 37,903 0 0 2,041,140 
1. Includes $56,945,518 for new work on previous projects. 
2. Includes replacement and 2nd lock Lock and Dam 26 funds $506,184,000. 
3. Includes replacement and 2nd lock Lock and Dam 26 funds $503,763,000. 
4. Includes $8,504,026 for maintenance on previous project. 
TOTAL COSTS OF EXISTING PROJECT 
TABLE 29-B TO SEPTEMBER 30, 1987 
Regular Public Work Emergency 
District Cost Funds Funds Relief Funds Total 
St. Paul New Work' $ 60,164,1682 $ 24,210,071 $ 9,071,214 $ 93,445,453 
Maintenance3 321,696,901 - - 321,696,901 
Rehabilitation 47,521,113 - - 47,521,113 
Total 429,382,182 24,210,071 9,071,214 462,663,467 
Rock New Work4 68,186,3455 17,403,322 11,338,865 96,928,532 
Island Maintenances 273,015,033 - - 273,015,033 
Rehabilitation 23,481,387 - - 23,481,287 
Total 364,682,765 17,403,322 11,338,865 393,424,952 
St. Louis New Work8 532,940,9317 10,282,566 2,440,266 545,663,763 
Maintenance 175,389,575 - - 175,389,575 
Total 708,330,506 10,282,566 2,440,266 721,053,338 
1. Excludes $2,041,140 contributed funds. Includes $7,673 expended in pool 
No. 11. 
2. Includes $159,359 transferred from Rock Island District covering pro rata 
share of cost of derrick boat Hercules. 
3. Includes $762,196 expended between 1930 and 1936 on operating and 
care of works of improvement under provisions of permanent indefinite appropriation 
for such purposes. Excludes $797,670 contributed funds. 
4. Excludes $58,999 contributed funds. 
5. $687,709 was transferred to St. Louis District in fiscal year 1958. 
Excludes $201,167 transferred to St. Paul and St. Louis Districts covering 
their pro rata share of cost of derrick boat Hercules. 
6. Costs subsequent to FY 1953 included with operating and care. Includes 
the sum of $395,442, expended between 1930 and 1934 on the operating and 
care of the works of improvement under the provisions of the permanent indefinite 
appropriation for such purposes. 
7. Includes $47,800 transferred from Rock Island District covering pro rata 
cost of derrick boat Hercules and $687,709 transferred from Rock Island 
District. 
8. Includes $500,249,908 for replacement of Lock and Dam 26. 
29-4

TABLE 29-C LOCKS AND DAMS 
Lock Dimensions 
Greatest Depth on Character of Foundation Percent 
Width Length Upper Miter Sill Complete 
Miles of Available Normal Locks, Year Estimated Cost of 
Above Cham- for Full Pool Dams, and Opened Each Lock and 
Ohio Miles from her Width Lift Eleva- Upper Lower Work in to Navi- Dam Including 
Lock and Dam River Nearest Town (feet) (feet) (feet) tion (feet) (feet) Lock Dam Pool gation Work in Pool 
St. Anthony 853.9 In city of 56 400 49.2 799.2 15.7 13.7 Some lime- Limestone. 1002 - $ 18,203,0003 
Falls, upper 
Lock 
St. Anthony 
Falls, lower 
Lock and dam 
Lock and dam 
1 
Lock and dam 
2 
Lock and dam 
3 
Lock and dam 
4 
Lock and dam 
5 
Lock and dam 
5A 
n Lock and dam 
6 
Lock and dam 
7 
Lock and dam 
8 
Lock and dam 
9 
Lock and dam 
10 
Lock and dam 
11 
Lock and dam 
12 
Lock and dam 
13 
Lock and dam 
14 
Le Claire Lock 
(Canal) 
Lock and dam 
15 
Lock and dam 
16 
Minneapolis, 
MN 
853.3 In city of 
Minneapolis, 
MN 
847.6 Minneapolis- 
St. Paul 
815.2 1.3 above 
Hastings, MN 
796.9 6.1 above Red 
Wing, MN 
752.8 Alma, WI 
738.1 Minneiska, MN 
728.5 3 above 
Winona, MN 
714.3 Trempealeau, 
WI 
702.5 Dresbach, MN 
679.2 Genoa, WI 
647.9 3.3 below 
Lynxville, WI 
615.1 Guttenberg, IA 
583.0 3.7 above 
Dubuque, IA 
556.7 Bellevue, IA 
522.5 4.3 above 
Clinton, IA 
493.3 3.7 below 
Le Claire, IA 
493.1 3.9 below 
Le Claire, IA 
482.9 Foot of Arsenal 
Island Rock 
Island, IL 
457.2 1.8 above 
Muscatine, IA 
stone, mainly 
sandstone. 
No piles. 
56 400 26.94 750.0 13.7 10.3 Sandstone. No Sandstone. 
piles. 
56 400 35.94 725.1 13.54 10.1 Rock and piles Piles in gravel. 
56 400 35.9 - 12.57 7.6 in gravel. 
110 500 12.2 - 16.0 15.1 Piles in sand, Piles in sand, 
1108 6008 12.2 687.2 22.2 13.0 silt and clay, silt and clay. 
110 600 8.0 675.0 17.0 14.0 Piles in sand, Piles in sand. 
silt and clay. 
110 600 7.0 667.0 17.0 13.0 Piles in sand Piles in sand 
and gravel, and gravel. 
110 600 9.0 660.0 18.0 12.0 Piles in sand Piles in sand. 
and gravel. 
110 600 5.5 651.0 18.0 12.5 Piles in sand. Piles in sand. 
110 600 6.5 645.5 17.0 12.5 Piles in sand, Piles in sand 
gravel and and clay. 
silt. 
110 600 8.0 639.0 18.0 12.0 Piles in sand Piles in sand. 
and gravel. 
110 600 11.0 631.0 22.0 14.0 Piles in sand, Piles in sand 
gravel and and gravel. 
broken rock. 
110 600 9.0 620.0 16.0 13.0 Piles in sand. Piles in sand. 
110 600 8.0 611.0 15.0 12.0 Piles in sand. Piles in sand. 
110 600 11.0 603.0 18.5 12.5 Piles in sand, Piles in sand. 
gravel and 
silt. 
110 600 9.0 592.0 17.0 13.0 Piles in sand Piles in sand 
and gravel, and gravel. 
110 600 11.0 583.0 19.0 13.0 Piles in sand, Piles in sand 
clay and and gravel. 
gravel. 
110 600 11.0 527.0 20.5 13.5 Rock. Rock. 
80 320 11.0 - 17.6 10.9 Rock. Rock. 
110 600 16.0 561.0 24.011 11.0 Rock. Rock. 
110 360 16.0 - 17.011 11.0 
110 600 9.0 545.0 17.0 12.0 Piles in sand Piles in sand 
and gravel, and gravel. 
100 1959 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
99 
99 
100 
92 
100 
95 
1917 
1930 
1948 
1938 
1935 
1935 
1936 
1936 
1937 
1937 
1938 
1936 
1937 
1938 
1938 
1939 
1922 
1934 
7 
12,382,0005 
2,358,0006 
6,492,0009 
5,596,000 
4,865,000 
5,081,000 
4,549,000 
4,874,000 
5,574,000 
6,061,000 
z 
6,539,000 
4,750,000 
7,428,000 
O 
5,580,000 
7,502,000 
6,284,000 
11,439,000 
98 1937 9,788,000

TABLE 29-C (Cont'd) LOCKS AND DAMS 
Miles 
Above 
Ohio Miles from 
Lock and Dam River Nearest Town 
Lock and dam 437.1 4.2 above New 
17 Boston, IL 
Lock and dam 410.5 6.5 above 
18 Burlington, 
IA 
Lock and dam 364.2 Keokuk, IA 
19 
Lock and dam 343.2 0.9 above 
20 Canton, MO 
Lock and dam 324.9 2.1 below 
21 Quincy, IL 
Lock and dam 301.2 1.5 below 
22 Saverton, MO 
Lock and dam 273.4 Clarksville, MO 
24 
Lock and dam 241.4 Cap Au Gris, 
t 25 MO 
Lock and dam 202.9 Alton, IL 
26 (Henry T. 
Rainey Dam) 
New Lock and 200.8 Alton, IL 
dam 26 
New Lock and 200.8 Alton, IL 
dam 26 (2nd 
Lock) 
Total, Locks 
and dams 
Lock Dimen 
Greatest 
Width Length 
of Available 
Cham- for Full 
ber Width 
(feet) (feet) 
110 600 
110 600 
110 358 
110 1,200 
110 600 
110 600 
110 600 
110 600 
110 600 
110 600 
110 360 
110 1,200 
110 600 
lsions 
Depth on Character of Foundation 
Upper Miter Sill 
Normal 
Pool 
Lift Eleva- Upper Lower 
(feet) tion' (feet) (feet) Lock Dam 
8.0 536.0 16.0 13.0 Piles in sand Piles in sand. 
and gravel. 
9.8 528.0 16.5 13.7 Piles in sand. Piles in sand. 
38.2 518.2 4.5 9.2 Rock. 
5.0 13.0 
10.0 480.0 15.0 12.0 Rock. 
10.5 
10.2 
15.0 
15.0 
24.0 
24.0 
24.0 
24.0 
Rock. 
Rock and 
piles in 
sand and 
gravel. 
470.0 16.5 12.0 Piles in sand Piles in sand 
and gravel, and gravel. 
459.5 18.0 13.8 Rock. Rock. 
449.0 19.0 12.0 Rock and piles. Piles in sand. 
434.0 19.0 12.0 Piles in sand Piles in sand 
and gravel, and gravel. 
419.0 19.0 10.0 Piles in sand. Piles and 
- 16.0 10.0 sand. 
419.0 23.0 18.0 Piles to Piles to 
bedrock. bedrock. 
419.0 42.0 18.0 Piles to Piles to 
bedrock. bedrock. 
1. Elevation of pools 1 to 22 and at St. Anthony Falls are mean sea level 9. In addition, $1,965,300 expended from prev 
1912 adjustment; pools 24, 26 are mean sea level 1929 adjustment. 10. Existing Le Claire Canal lock is used as au 
2. Includes existing dam, owned by Northern States Power Co. project cost $540,000. 
3. Includes dredging above upper lock. (Federal cost only.) 11. Depth over upper poiree sill. Depth over up 
4. Based on pool elevation 723.1 in pool 1 which is crest of dam. Pool is nor- lock 15. 
mally maintained at elevation 725.1 by flashboards. 12. $640,868 for first lock was reported by Mississ 
5. Includes lower approach dredging and dredging between upper and lower transferred to Government free in lieu of improve 
rock. (Federal cost only.) Report, 1928, pp. 1118-1119.) Present estimate inc 
6. In addition $1,948,000 expended from previous projects and $1,349,600 lock and appurtenant work. 
from O & C appropriation for first of twin locks. Excludes lock and dam 13. Includes cash contribution of $3,950,000. 
rehabilitation program. 14. Complete except for guidewall extensions. 
7. Old upper guard sill. 
8. Landward lock. 
I 
_ 
Percent 
Complete 
Locks, Year Estimated Cost of 
Dams, and Opened Each Lock and 
Work in to Navi- Dam Including 
Pool gation Work in Pool 
99 1939 $ 5,843,000 , 
90 1937 10,308,000 0 
100 1913 
99 1957 14,813,00012 
97 1936 6,281,000 C 
95 1938 8,065,000 
99 1938 5,275,000 
9914 1940 10,337,000 
9914 1939 13,694,000 
100 1938 12,824,000 
0 
66 - 747,480,000 0 
4 - 214,000,000 
0 
$ 1,184,265,000 
iious projects. 
xiliary to lock 14; previous 
per miter sill is 27 feet, at 
ippi River Power Company, 
ements destroyed. (Annual 
ludes $13,132,600 for main

TABLE 29-D 
Name 
Harriet Island Harbor, 
St. Paul, MN 
St. Paul Harbor, MN 
Hastings Harbor, MN 
Red Wing Harbor, MN 
Red Wing Harbor, MN 
Bay City Harbor, WI 
Lake City Harbor, MN 
Pepin Harbor, WI 
Wabasha Harbor, MN 
Alma Harbor, WI 
Winona Harbors, MN 
S Lansing Harbor, IA 
Prairie du Chien 
Harbor, WI 
Cassville Harbor, WI 
Dubuque Harbor, IA 
Savanna Harbor, IL 
Clinton Harbor, IA 
Moline Harbor, IL 
Davenport Harbor, IA 
(Lindsay Park) 
Rock Island Harbor, IL 
Andalusia Harbor, IL 
Muscatine Harbor, IA 
New Boston Harbor, IL 
Fort Madison Harbor, 
IA 
HARBOR IMPROVEMENTS 
Miles above Location Project Approximate size (feet) Actual or Type depth Percent Estimated 
Ohio River (feet) Width Length Complete Cost 
840.2 In city of St. Paul, MN Small-boat 5 70 925 0 $ 292,000' 
836.5-839.2 In city of St. Paul, MN 
839.7 Channel improvement, 
Small-boat harbor and 
channel enlargement. 
813.2 Lower end of city of 
Hastings, MN 
791.4 In city of Red Wing, MN 
791.1 In city of Red Wing, MN 
785.9 Upper end of Bay City, 
WI 
773.0 In city of Lake City, MN 
767.1 In city of Pepin, WI 
760.0 Upper end of city of 
Wabasha, MN 
751.3 Upper end of Alma, WI 
726.0 In city of Winona, MN 
Latsch Island 
726.2 Crooked Slough 
663.3 Upper end of city of 
Lansing, IA 
635.5 Upper end of city of 
Prairie du Chien, WI 
635.0 In Marais de St. Friol 
East Channel below 
Hwy bridges. 
606.6 At Cassville, WI 
579.4 At Dubuque, IA 
537.3 At Savanna, IL 
519.0 At Clinton, IA 
488.0 At Moline, IL 
484.2 At Lindsay Park 
479.8 At Rock Island, IL 
473.0 Andalusia Slough 
455.5 At Muscatine, IA 
455.6 
433.1 In Boston Bay 
383.7 At Fort Madison, IA 
Commercial 
Small-boat 
Small-boat 
Commercial 
Small-boat 
Small-boat 
Small-boat 
Commercial4 
Small-boat 4 
Small-boat 
Small-boat 
Small-boat 
Small-boat 
Commercial 
Small-boat 
Small-boat 
Commercial 
Small-boat 
Commercial 
Small-boat 
Small-boat 
Small-boat 
Small-boat 
5 
12
5555 
Entrance channel 
small-boat harbor 
Small-boat 
Small-boat 
Freight terminal 
approach channel 
Small-boat 
Small-boat 
400-1,000 
300 
200 
300 
450 
50-100 
400 
500 
500 
50 
175-400 
300 
200 
200 
170 
400 
120 
340 
280 
400 
230 
200 
100 
40 
150 
200 
90-135 
250 
2.7(mile) 100 
400 100 
500 100 
1,200 100 
800 100 
5,990 100 
600 
1,000 
850 
600 
800 
100 
100 
100 
100 
100 
500 100 
1,000 100 
6,000 100 
500 100 
800 100 
1,000 
frontage 
565 
1,500 
910 
1,400 
660 
1,150 
1,100 
435 
950 
1,890 
600 
900 
100
0 
100
0 
78 
100 
100 
100 
100 
100
0 
100 
217,100 
230,200 
74,300 
146,8002 C 
8,700 Ci) 
39,4003 
93,500 ; 
1,077,0005 
205,5006 tj 
41,700 [ 
56,300 M 
89,800 
84,500 
95,300 Z 
85,000 
93,100 0 
178,000 
55,200 
310,000 d 
101,912 
110,328 j 
262,100 Z 
31,000 
21,000 r 
353,000 
23,000 
184,200

TABLE 29-D (Cont,d) HARBOR IMPROVEMENTS 
Miles above Project Approximate size (feet) Actual or 
Name Ohio Rive Location Type depth Percent Estimated 
(feet) Width Length Complete Cost 
Keokuk Harbor, IA 
Warsaw Harbor, IL 
Quincy Harbor, IL 
Hannibal Harbor, MO 
Total 
363.5 At Keokuk, IA 
359.1 At Warsaw, IL 
327.3 In Quincy Bay, IL 
308.8 At Hannibal, MO 
Small-boat 
Small-boat 
Small-boat 
Small-boat 
5 100-600 
5 100 
5 200-300 
5 180-260 
1,015 
600 
9,000 
600 
0 
100
0 
100 
1. In addition, local interests will contribute $292,000. 
2. In addition, local interests contributed $3,455. 
3. In addition, local interests contributed $9,533. 
4. Commercial harbor converted to small-boat harbor under authority of 
Section 107 of 1960 River and Harbor Act, as amended. Primary use is smallboat, 
although some commercial activity exists. 
5. In addition, local interests contributed $812,559. 
6. In addition, local interests contributed $32,344. 
7. Maintenance only, estimated at $5,000 annually. 
394,000 
73,000 d 
- 
129,000 ' 
$5,077,240 
0
O
y
n 
d 
O 
Oi
0
m 
cA 
0
0

MISSISSIPPI RIVER BETWEEN MISSOURI AND MINNEAPOLIS, MN 
TABLE 29-E 
ADDITIONAL FEATURES ENTERING INTO 
COST OF PROJECT 
Facilities for public use, convenience and safety 
Rectification of damages caused by seepage and backwater 
Regulating works between Lock and Dam 26 (Henry T. Rainey 
Dam) and Missouri River 
Improvement of Beaver Slough at Clinton, Iowa, for navigation 
Miscellaneous 
Total additional features 
Total existing project (new work) 
$ 7,238,800 
8,259,600 
545,000 
193,600 
2,468,900 
18,705,900 
$468,584,858 
1. Includes a lump-sum payment of $2,146,800 (O&M appropriation) paid 
to the Sny Island Levee Drainage District, IL, for rectification of seepage 
damages. Also includes $140,000 Construction General funds for project 
studies, evaluation, and report preparation. 
2. Includes $686,500 for repairs to Stone Arch Bridge, Minneapolis, MN. 
(FY 1969) 
3. Excludes $227,000 (1965) for inactive remedial measures at Sandy 
Slough, MO. 
LICENSE FEES COLLECTED 
TABLE 29-F THROUGH FISCAL YEAR 1987
Annual Collections to 
Dam Licensee Charge Sept. 30, 1987 
St. Anthony Falls Lower Northern States Power $ 3,300 $ 83,377 
Lock and Dam Co. (No. 2056) 
Lock and Dam No. 1 Ford Motor Co. 95,400 5,916,840 
Total project (No. 362) $6,000,217 
29-9 
_ __

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 29-G AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND 
MINNEAPOLIS, MN 
Sep. 22, 1922 
July 3, 1930 as 
amended by P.R. 
No. 10, Feb. 24, 
1932 
June 26, 1934 
Aug. 30, 1935 
Aug. 26, 1937 
Aug. 30, 1935 
Aug. 26, 1937 
Dec. 22, 1944 
Mar. 2, 1945 
Mar. 2, 1945 
Mar. 2, 1945 
Mar. 2, 1945 
None 
Mar. 2, 1945 
Mar. 2, 1945 
Mar. 2, 1945 
July 24, 1946 
July 24, 1946 
July 24, 1946 
July 24, 1946 
July 24, 1946 
June 30, 1948 
May 17, 1950 
May 17, 1950 
May 17, 1950 
May 17, 1950 
May 17, 1950 
May 17, 1950 
May 17, 1950 
May 17, 1950 
Sep. 3, 1954 
Sep. 3, 1954 
July 3, 1958 
July 3, 1958 
Dredging channels to landing places. 
Project adopted from Illinois River to Minneapolis; Chief of 
Engineers granted discretionary authority to make such 
modification in plan as may be deemed advisable. 4 
Operation of snag boats and operation and care of locks and dams 
to be provided for with funds from Department of the Army 
appropriations for rivers and harbors. 
Missouri River established as lower limit of project. 
Extension of 9-foot channel above St. Anthony Falls, MN, 
including adequate terminal facilities for Minneapolis, MN 
St. Paul, MN harbor. 
Determine damages to drainage and levee districts caused by 
seepage and backwater, and cost of making rectification thereof. 
Public park and recreational facilities. 
Red Wing, MN harbor. 
Remedial works to correct damages caused by seepage and 
backwater at Cochrane, WI 
Such changes or additions to payments, remedial works, or land 
acquisitions authorized by River and Harbor Act of Aug. 26, 
1937 (River and Harbor Committee Doc. 34, 75th Cong., 1st 
sess.), as Chief of Engineers deems advisable. 
St. Paul, MN channel enlargements, small boat harbor, and 
roadway. 
Vertical bridge clearance at Minneapolis to 26 feet above 
estimated stage for discharge of 40,000 c.f.s. 
Winona, MN basin. 
Future modification of lock and dam No. 2 for power 
development. 
Provides for cash contribution by local interests in lieu of 
alteration of privately owned bridges and utilities for St. 
Anthony Falls project. 
Lake City, MN harbor. 
Wabasha, MN harbor. 
Payment of damages caused by backwater and seepage, pools 3 
to 11. 
Hastings, MN harbor. 
Lansing, IA harbor. 
Fort Madison, IA harbor. 
Payment of damages caused by pool No. 14 at Clinton, IA. 
Davenport, IA harbor. 
Muscatine, IA harbor. 
Alma, WI harbor. 
Hannibal, MO harbor. 
Prairie du Chien, WI harbors. 
Opposite Hamburg, IL harbor.' 
Permits such change in location of Winona, MN small boat basin 
authorized by River and Harbor Act of Mar. 2, 1945 (H. Doc. 
263, 77th Cong., 1st sess.), as Chief of Engineers deems advisable. 
Construction of Crooked Slough Harbor at Winona, MN, in lieu 
of previously authorized commercial harbor. 
Payment of damages caused by pool No. 24 at Louisiana, MO. 
Permits modification of vertical bridge clearances and authorizes 
completion of St. Anthony Falls project. 
Small boat and commercial harbors at Alton, IL. 2 
None 
H. Doc. 290, 71st Cong., 2d sess. 
None 
H. Doc. 137, 72nd Cong., 1st sess. 
H. Doc. 137, 72nd Cong. 1st 
sess. 
Rivers and Harbors Committee 
Doc. 44, 74th Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 34, 75th Cong., 1st sess. 
None 
H. Doc. 103, 76th Cong., 1st 
sess. 
H. Doc. 137, 76th Cong., 1st 
sess. 
None 
H. Doc. 547, 76th Cong., 3rd 
sess. 
S. Doc. 54, 77th Cong., 1st sess. 
H. Doc. 263, 77th Cong., 1st 
sess. 
H. Doc. 432, 77th Cong., 1st 
sess. 
H. Doc. 449, 78th Cong., 2d sess. 
H. Doc. 511, 79th Cong., 2d sess. 
H. Doc. 514, 79th Cong., 2d sess. 
H. Doc. 515, 79th Cong., 2d sess. 
H. Doc. 559, 79th Cong., 2d sess. 
S. Doc. 192, 79th Cong., 2d sess. 
H. Doc. 661, 80th Cong. 2d sess. 
S. Doc. 197, 80th Cong., 2d sess. 
H. Doc. 642, 80th Cong., 2d sess. 
H. Doc. 733, 80th Cong., 2d sess. 
H. Doc. 66, 81st Cong., 1st sess. 
H. Doc. 67, 81st Cong., 1st sess. 
H. Doc. 71, 81st Cong., 1st sess. 
H. Doc. 254, 81st Cong., 1st sess. 
None 
H. Doc. 347, 83rd Cong., 2d 
sess. 
H. Doc. 251, 82nd Cong., 1st 
sess. 
H. Doc. 33, 85th Cong., 1st sess. 
H. Doc. 136, 84th Cong., 1st sess. 
29-10

MISSISSIPPI RIVER BETWEEN MISSOURI AND MINNEAPOLIS, MN 
TABLE 29-G (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 3, 1958 Payment of lump sum amounts for damages to drainage and levee H. Doc. 135, 84th Cong., 1st 
districts caused by operation of navigation pools. sess. 
July 3, 1958 Improvement and maintenance of Beaver Slough at Clinton, IA. H. Doc. 345, 84th Cong., 2d sess. 
Mar. 3, 1909 Reconstruction of structures as may be necessary to provide None 
adequate facilities for existing navigation. 
July 14, 1960 Construction of Industrial Harbor at Red Wing, MN. H. Doc. 32, 86th Cong., 1st sess. 
Oct. 23, 1962 Construction of small-boat harbors at Savanna, Moline, H. Doc. 513, 87th Cong., 2d sess. 
Andalusia, New Boston,' Warsaw, Quincy, and Grafton, IL; 
Bellevue, 1 Clinton, Davenport, and Keokuk', IA; St. Paul 
(Harriet Island), MN; and Bay City, Pepin, and Cassville,' WI. 
Oct. 23, 1962 Payment of damages caused by pool 24 at Clarksville, MO. H. Doc. 552, 87th Cong., 2d sess. 
Oct. 23, 1962 Remedial works at Sandy Slough, MO. H. Doc. 419, 87th Cong., 2d sess. 
Nov. 7, 1966 Repair of Stone Arch Bridge at Minneapolis, MN. None 
Oct. 21, 1978 Replacement of Lock and Dam 26 Public Law 95-502 
1. Deferred. 
2. Inactive. 
3. Deauthorized FY 87 (WRDA of 1986). 
4. Guidewalls at Locks 3, 4, 5, 5A, 7, 8, 9, and 10 deauthorized FY 87 (WRDA of 1986). 
29-11

CHICAGO, ILLINOIS, DISTRICT * 
This district comprises Cook, McHenry, Lake, Kane 
DuPage and Will Counties in Illinois, and Lake and 
Porter Counties in Indiana, including a portion of 
LaPorte County along Lake Michigan. 
Navigation 
1. Burns Waterway Harbor, IN 
2. Calumet Harbor and Rv. IL and IN 
3. Chicago Harbor, IL 
4. Chicago River, IL 
5. Indiana Harbor, IN 
6. Michigan City Harbor, IN 
7. Waukegan Harbor, IL 
8. Reconnaissance and Cond. Surveys 
9. National Emergency Preparedness 
10. Navigation Work Under Special 
Authorization 
Alteration of Bridges 
11. Other Authorized Bridge Alteration 
Beach Erosion Control 
12. 
13. 
14. 
15. 
16. 
Casino Beach, Chicago, IL 
Indiana Dunes National Lakeshore 
Indiana Shoreline, IN 
Other Authorized Beach Erosion 
Beach Erosion Control Under 
Special Authorization 
IMPROVEMENTS 
Page Flood Control 
30-2 
30-2-3 
30-3 
30-3-4 
30-4 
30-4-5 
30-5 
30-5 
30-5 
30-5-6 
17. Chicago River, IN (North Branch) 
18. Lake Michigan, Edgewater/Rogers 
Park Communities, Chicago, IL 
19. Little Calumet River, IN 
20. Little Calumet River Basin 
(Cady Marsh Ditch), IN 
21. North Branch Chicago River, IL 
22. O'Hare Reservoir, IL 
23. Other Auth. Flood Control Projects 
24. Flood Control Work Under Special 
Authorization 
General Investigation 
30-6 25. 
26. 
30-6 27. 
28. 
29. 
30-6 
30-6 
30-6 
3300--66 
Surveys 
Collection and Study of Basic Data 
Continuation of Planning and 
Engineering 
Advance Engineering and Design 
Miscellaneous 
TITLE 
Cost and Financial Statement ......................... 
Authorizing Legislation ................... .............. 
Existing Projects ................................. 
Other Authorized Bridge Alteration ......................... 
Other Authorized Beach Eros. Projects ................... 
Other Authorized Flood Control Projects ............... 
Deauthorized Projects ............................... 
Reconnaissance and Condition Survey ..................... 
30-1 
Page 
30-7 
30-7-8 
30-8 
30-8 
30-8-9 
30-9 
30-9 
30-9 
30-9 
30-9 
30-10 
30-10 
30-10 
TABLES 
30-A 
30-B 
30-C 
30-D 
30-E 
30-F 
30-G 
30-H 
PAGES 
30-11-12 
30-13-16 
30-17 
30-18 
30-18 
30-18 
30-18 
30-18

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. BURNS WATERWAY HARBOR, IN 
Location. Northwestern Indiana, on the southern 
shore of Lake Michigan in Porter County, 28 miles 
southeast of Chicago Harbor. (see NOAA Nautical 
Charts Numbers 14905 and 14926). 
Existing Project. Provides for (a) rubble mound 
north breakwater 4,646 feet long; (b) a rubble mound 
west bulkhead 1,176 feet long; (c) a stone filled steel 
sheet pile cell, west bulkhead shore connection 2,300 
feet long; (d) an approach channel 30 feet deep and 400 
feet wide; (e) an outer harbor 28 feet deep; (f) an east 
harbor arm 27 feet deep and 620 feet wide; (g) a west 
harbor arm 27 feet deep and 620 feet wide. The project 
was authorized by the River and Harbor Act of 27 
October 1965 (Public Law 89-298; House Document 
Number 160, 88th Congress, 1st Session). The authorizing 
act also provided the Secretary of the Army to 
reimburse The State of Indiana for expenditure of 
funds used to construct such portions of the project 
as approved by the Chief of Engineers and constructed 
under supervision of the Chief of Engineers. 
See table 30-C. 
Local Cooperation. Fully complied with. 
Terminal Facilities. Seven berths and docks are 
available, three on the west harbor arm, one on the 
harbor basin, and three on the east harbor arm. One 
dock on the west harbor arm is used for shipment and 
receipt of steel products. One dock on the east harbor 
arm is used for receipt of iron ore pellets and limestone 
and shipment of steel products. Five facilities are 
administered by the Indiana Port Commission and 
are used for handling general cargo. 
Operations and results during period. 
Maintenance: Condition surveys were performed 
by Detroit District at a cost of $10,200. Plans and 
specifications were developed by hired labor for the 
repair of the north breakwater at a cost of $41,314. 
Project management for these activities was performed 
by hired labor at a cost of $6,667. 
Condition at end of fiscal year. The existing 
project is complete. Total costs of existing project to 
September 30, 1987 were $17,612,772 of which 
$13,599,900 was for new work ($13,584,000 Federal 
and $15,900 non-Federal), and $4,012,872 for 
maintenance. 
2. CALUMET HARBOR AND RIVER, 
IL and IN 
Location. Northeastern Illinois, on the southwest 
shore of Lake Michigan in Cook County, 15 miles 
south of Chicago Harbor, within corporate limits of 
the city of Chicago, except for breakwaters, an 
approach channel and an anchorage area which are 
in Illinois and Indiana (See NOAA Nautical Charts 
Numbers 14926 and 14929). 
Previous Projects. For details see page 1400 of 
Annual Report for 1962. 
Existing Project. Provides for (a) stone filled 
timber crib breakwater 6,714 feet long; (b) a stone filled 
double row steel sheet pile detached breakwater 5,007 
feet long; (c) a north pier 2,450 feet long; (d) an 
approach channel 29 feet deep and 3,200 feet wide; 
(e) an outer harbor anchorage area 28 feet deep and 
3,000 feet wide; (f) an entrance channel 27 feet deep 
and 230 to 290 feet wide; (g) a channel in the Calumet 
River 27 feet deep and at least 200 feet wide to the 
north side of 130th street; (h) three turning basins 
designated as numbers 1, 3 and 5; (i) a channel 
extending into Lake Calumet at a width of about 1,000 
feet. The project was authorized by the River and 
Harbor Act of 3 March 1899, 13 June 1902, 30 August 
1935, 14 July 1960, 23 October 1962, and 27 October 
1965. See table 30-C. 
Local Cooperation. Fully complied with. 
Terminal Facilities. Thirty six docks, wharves, 
and terminals are available. The Chicago Regional 
Port District owns four wharves, two grain elevators, 
one dock, and one terminal. The United States 
Government owns one stone dock. The most important 
cargoes handled are iron ores and concentrates, 
coal, and lignite. 
Operations and results during period. 
Maintenance: Water quality activities are performed 
by contract at a cost of $27,097, by other federal 
agency at a cost of $3,000, and by hired labor at a cost 
of $31,108. Placement of 5000 tons of stone on the 
southerly exterior breakwater was performed by 
other COE at a cost of $121,643. Hydrographic 
surveys and cross section surveys on the attached 
breakwater (reaches A & B) were performed by contract 
at a cost of $68,652, and by other COE at a cost 
of $1,815. Engineering and design of the confined 
Disposal Facility were performed by other COE at a 
cost of $1,020 and by hired labor at a cost of $31,789. 
Project management for these activities were performed 
by hired labor at a cost of $51,226. Under the 
major rehabilitation project, hydrographic surveys 
were performed by hired labor at a cost of $2,582, and 
by contract at a cost of $10,000. Tug and crane 
equipped spud barge, accessory equipment, and 
operating personnel were leased at a cost of $15,130. 
General Design Memorandum was performed by 
other COE at a cost of $9,658 and by hired labor at a 
cost of $196,091. Project management was performed 
by hired labor at a cost of $4,027. 
Condition at end of fiscal year. The existing 
project is 79% complete. Work remaining to be accomplished 
consists of widening and straightening 
the Calumet River in the vicinity of 106th Street, and 
the inactive portion which consists of closing the gap 
between the breakwaters, and dredging minor 
shoals in the outer harbor. 
Total costs of existing project to September 30, 1987 
were $48,506,145, of which $22,578,567 was for new work 
30-2

CHICAGO, IL, DISTRICT 
($19,541,964 regular funds and $3,036,603 public works 
funds) $24,164,422 regular funds for maintenance. 
$836,667 non-Federal funds for maintenance, and 
$926,489 regular funds for rehabilitation. 
3. CHICAGO HARBOR, IL 
Location. Northeastern Illinois on the southwest 
shore of Lake Michigan in Cook County, within the 
corporate limits of the City of Chicago, (See NOAA 
Nautical Charts Numbers 14926, 14927, and 14928). 
Previous projects. See page 1396 of Annual 
Report for 1962. 
Existing Project. Provides for (a) a stone filled 
timber crib shore arm extension breakwater 2,250 feet 
long; (b) a stone filled timber crib exterior breakwater 
5,421 feet long; (c) a rubble mound and stone filled 
concrete caisson southerly extension to the exterior 
breakwater 4,944 feet long, exclusive of 582 foot entrance 
gap enclosing an outer basin of about 970 acres; 
(d) a stone filled timber crib north pier 960 feet long; 
(e) a stone filled timber crib north inner breakwater 
4,034 feet long with a 304 foot shore return, and a 754 
foot gap; (f) a stone filled timber crib south inner 
breakwater 2,544 feet long enclosing an inner basin of 
approximately 224 acres; (g) a lake approach channel 
29 feet deep and 800 feet wide; (h) a channel and 
manuever area inside the exterior breakwater and exterior 
breakwater southerly extension 28 feet deep 
with a maximum width of 1,300 feet; (i) an inner basin 
21 feet deep; (j) an entrance channel 21 feet deep. The 
project was authorized by the River and Harbor Acts 
of 11 July 1870, 14 June 1880, 3 March 1899, 25 July 
1912, 2 March 1919 and 23 October 1962. See table 
30-C. 
The Chicago Lock was constructed in 1938 by the 
Metropolitan Sanitary District of Greater Chicago. 
The deep draft lock is 600 feet long, 80 feet wide, and 
23 feet deep and uses a steel cellular design. Operation 
and maintenance responsibilities in the interests of 
navigation were transferred to the Federal Government, 
pursuant to Public Law 98-63, approved 30 July 
1983, Section 107 of the Public Law 97-88, and Memorandum 
of Agreement between the Department of 
the Army and the Metropolitan Sanitary District 
of Greater Chicago. 
Local Cooperation. Fully complied with. 
Terminal facilities. There are three docks, two 
for passenger excursion boats and one for cargo. The 
most important cargoes handled are sugar and nonmetallic 
minerals. 
Operations and results during period. 
Maintenance: Breakwater surveys were performed 
by other COE at a cost of $4,228. A boundary survey 
was performed by hired labor at a cost of $1,835. The 
lock operations contract was continued with International 
Research and Development, Inc. for 
$439,876. Other support for operations of the lock 
amounted to $28,673. A major rehabilitation study 
of the lock was performed by hired labor at a cost of 
$740. Plans and Specs of the lock electrical system 
were performed by hired labor at a cost of $203,922, 
and by other COE at a cost of $15,500. Lock supplies 
were purchased at a cost of $5,284. Boring Tests were 
performed by other COE at a cost of $6,920. Foundation 
Exploration were continued by contract at a 
cost of $6,242, and by hired labor at a cost of $1,077. 
Periodic Inspection activities were performed by 
hired labor at a cost of $7,681 and by other COE at a 
cost of $532. Closeout of the dredging contract to 
remove 31,000 cubic yards of shoaling was completed 
at a cost of $7,723. E & D for a maintenace facility 
were performed at a cost of $131,198. Contract administration 
and project management for these activities 
were performed by hired labor at a cost of $1,341 and 
$94,215, respectively. 
Condition at end of fiscal year. The existing 
project is complete. Total costs of existing project to 
September 30, 1987 were $16,811,686, of which 
$4,342,822 was for new work. $11,142,264 for maintenance, 
and $1,326,600 for rehabilitation. 
4. CHICAGO RIVER, IL 
Location. Northeastern Illinois, in Cook County 
within the corporate limits of the City of Chicago. 
(See NOAA Nautical Charts Numbers 14926, 14927 
and 14928). 
Previous projects. See page 1394 of Annual 
Report for 1962. 
Existing Project. Provides for (a) a channel 21 
feet deep in the main river from its mouth at Rush 
Street to the junction of the North and South Branches 
(0.7 miles); (b) a channel 21 feet deep in the North 
Branch from the junction to North Avenue (2.22 
miles); (c) a channel 21 feet deep in the North Branch 
Canal (1.04 miles); (d) a 21 foot deep North Branch 
Turning Basin just south of North Avenue; (e) a channel 
9 feet deep in the North Branch from North 
Avenue to Addison Street. All dredging to within 
20 feet of existing docks. The project was authorized 
by the River and Harbor Acts of 3 March 1899, 13 
June 1902, 2 March 1907, and 24 July 1946. Portion 
of project authorized by River and Harbor Act of 
1946 is in deferred-for-restudy category. See table 
30-C. 
Local Cooperation. Fully complied with for 
completed modifications. River and Harbor Act of 24 
July 1946 which provided improvement of channel 
is subject to condition that local interests furnish assurances 
they will hold the United States free from 
damages which may result from construction and 
maintenance of improvement. Requirement has not 
been complied with. 
Terminal Facilities. Six docks are available. 
The most important cargoes handled are sand, gravel 
and crushed rock. 
Operations and results during period. 
Maintenance: An Environmental Impact State- 
30-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
ment was developed by hired labor at a cost of 
$152,738, and by other federal agency at a cost of 
$122. Under the Lake Michigan Water Diversion 
monitoring program, data collection for water control 
and water quality activities were performed by hired 
labor at a cost of $299,752, by other Corps at a cost of 
$57,359, by contract at a cost of $67,128, and by other 
federal agency at a cost of $58,082. Close out of the 
dredging contract to remove 31,000 cubic yards of 
shoaling was completed at a cost of $7,723, and by: 
hired labor at a cost of $191. Project management 
was performed by hired labor at a cost of $51,001. 
Condition at end of fiscal year. The project 
is complete except for dredging the channel between 
North Avenue and Addison Street as authorized by 
1946 River and Harbor Act. Head of navigation for 
deep draft vessels are North Avenue, 5.97 miles from 
deauthorized Michigan Avenue Bridge. Under 
Section 1142, PL 99-662, the Corps assumes responsibility 
for monitoring of the Diversion of Lake 
Michigan Water into the Illinois waterway. The 
Corps assumes full diversion accounting responsibility 
in FY 88. 
Total costs of existing project to September 30, 1987 
were $10,738,964 of which $1,500,565 was for new 
work and $9,238,399 was for maintenance. 
5. INDIANA HARBOR, IN 
Location. Northwestern Indiana, on the southwest 
shore of Lake Michigan in Lake County, 19 miles 
southeast of Chicago Harbor. (See NOAA Nautical 
Charts Numbers 14926 and 14929). 
Previous projects. For details see page 1943 of 
Annual Report for 1915, and page 1520 of Annual 
Report for 1938. 
Existing Projects. Provides for (a) northerly 
rubble-mound breakwater 1,120 feet long; (b) an 
easterly concrete capped concrete caisson breakwater 
201 feet long with a rubble mound extention 2,324 
feet long; (c) a lake approach channel 29 feet deep and 
800 feet wide; (d) an anchorage and maneuver basin 28 
feet deep; (e) a canal entrance channel 27 feet deep 
and 280 feet wide; (f) a main canal 22 feet deep; (g) a 
turning basin 22 feet deep; (h) the Forks Turning 
Basin 22 feet deep; (i) the Lake George Branch 22 feet 
deep; (j) the Calumet River Branch 22 feet deep. The 
project was authorized by the River and Harbor Acts 
of 4 March 1913, 2 March 1919, 20 March 1922, 3 July 
1930, 30 August 1935, 26 August 1937, and 14 July 
1960. See table 30-C. 
Local Cooperation. Substantially complied with. 
See the FY 1986 Annual Report for full requirements. 
Terminal Facilities. Fifteen docks and wharves 
are available. Six docks for handling iron ore and 
limestone. Six docks for handling petroleum products. 
Three docks for handling gypsum, scrap metal and 
steel, and bulk products. 
Operations and results during period. 
Maintenance: An Environmental Impact Statement 
associated with the confined disposal facility was 
performed by hired labor at a cost of $27,902, and by 
contract at a cost of $36,584. E & D for the confined 
disposal facility was continued by hired labor at a cost 
of $201,510. A research and development program 
was continued with the Waterway Experiment Station 
at a cost of $9,505. Project management for 
these activities was performed by hired labor at a 
cost of $18,193. 
Condition at end of fiscal year. The existing 
project is complete. Total costs of existing project to 
September 30, 1987 were $13,356,776, of which 
$11,726,235 was Regular Funds, $1,618,041 was Public 
Works Funds, and $12,500 was Contributed Funds. 
Of the total cost, $4,848,980 was for new work and 
$8,507,796 was for maintenance. 
6. MICHIGAN CITY HARBOR, IN 
Location. Northwestern Indiana, on the southeast 
shore of Lake Michigan in LaPorte County, 
38 miles southeast of Chicago Harbor (See NOAA 
Nautical Charts Numbers 14905 and 14926). 
Previous projects. See page 1407 of Annual 
Report for 1962. 
Existing Project. Provides for (a) a stone filled 
timber crib detached breakwater 1,304 feet long; (b) a 
pile and steel sheeting west pier 835 feet long; (c) a 
stone filled timber crib, pile and steel sheeting east 
pier 2,276 feet long; (d) a stone filled timber crib east 
breakwater 1,000 feet long; (e) an entrance channel 18 
feet deep and 425 feet wide; (f) a turning basin 18 feet 
deep; (g) a channel in Trail Creek 18 feet deep; (h) a 
turning basin 18 feet deep; (i) an outer basin 12 feet 
deep; (j) an outer basin 8 feet deep; (k) a channel in 
Trail Creek 6 feet deep and 50 feet wide. The project 
was authorized by the River and Harbor Acts of 3 
March 1889, 3 March 1905, 21 January 1927, 30 
August 1935, and Section 107 of 14 July 1960 approved 
on 30 September 1966. See table 30-C. 
Local Cooperation. Fully complied with. 
Terminal Facilities. There are several marinas 
in the lower mile of Trail Creek. The commodity 
handled at this harbor is fresh fish. 
Operations and results during period. 
Maintenance: Condition surveys were performed by 
Detroit District'at a cost of $4,313. Water quality 
activities were performed by other Corps at a cost of 
$1,035, and by contract at a cost of $36,708. Maintenance 
dredging of 600 feet of the Entrance channel, 
and dredging of 21,000 cubic yards of polluted 
material from Trail Creek and placement into a land 
based government disposal area were performed by 
contractors at a cost of $773,350. Plans and specifications 
were performed by hired labor at a cost of 
$223,376. Contract administration and Project 
30-4

CHICAGO, IL, DISTRICT 
management costs for these activities were $63,488 
and $13,162, respectively. 
Condition at end of fiscal year. The existing 
project is complete. Total costs of existing project to 
September 30, 1987 were $8,684,155 of which 
$1,287,057 was for new work ($1,256,257 Federal and 
$30,800 non-Federal funds), $5,778,428 for maintenance, 
and $1,618,670 for rehabilitation. 
7. WAUKEGAN HARBOR, IL 
Location. Northeastern Illinois, on the southwest 
shore of Lake Michigan in Lake County, 38 miles 
north of Chicago Harbor. (See NOAA Nautical 
Charts Numbers 14904 and 14905). 
Previous projects. See page 1392 of Annual 
Report for 1962. 
Existing Projects. Provides for (a) a northerly 
stone filled timber crib breakwater 588 feet long; (b) a 
stone filled reinforced concrete caisson shore connection 
270 feet long; (c) a stone filled double row steel 
sheeting shore connection 640 feet long; (d) a single 
row steel sheeting shore connection 398 feet long; 
(e) a stone filled timber crib north pier 998 feet long; 
(f) a single row steel sheet piling north pier 444 feet 
long; (g) a steel piling revetment 632 feet long; (h) a 
stone filled timber crib pier 1,399 feet long; (i) a stone 
filled double row pile and sheeting south pier 1,712 feet 
long; (j) an entrance channel 22 feet deep and 390 feet 
wide; (k) a channel between the piers 18 feet deep and 
200 feet wide; (1) an inner basin 13 feet deep; (m) an 
anchorage area in the southwest corner of the inner 
basin 8 feet deep. The project was authorized by the 
River and Harbor Acts of 13 June 1902, 3 July 1930, 
and 2 March 1945. See Table 30-C. 
Local Cooperation. Fully complied with. 
Terminal Facilities. Four docks are available. 
The commodities handled at this harbor are gypsum 
and building cement. 
Operations and results during period. 
Maintenance: Condition surveys of the South Pier 
were performed by Detroit District at a cost of $870. 
Environmental dredging studies and monitoring 
activities were performed by hired labor at a cost of 
$96,789. Inspection and reports were credited for 
$2,553. E & D for maintenance and repairs of the 
North Pier Breakwater were performed by hired labor 
at a cost of $2,099. Collection and analysis of sediments 
within the approach channel was performed 
by contract at a cost of $5,000. A Polyaromatic 
Hydrocarbon study was performed by the Waterways 
Experiment Station at a cost of $25,000. E & D for the 
confined disposal facility was developed by hired 
labor at a cost of $34,853. FY 1985 dredging contract 
was credited $20,329. Project Management was 
performed by hired labor at a cost of $16,495. 
Condition at end of fiscal year. The existing 
project is complete except for the 1970 modification 
which is inactive. Total costs of existing project to 
September 30, 1987 were $6,739,083, which $823,026 
was for new work and $5,916,057 was for maintenance. 
8. RECONNAISSANCE AND 
CONDITION SURVEYS 
Condition surveys were performed by the Detroit 
District at a cost of $31,359 (see table 30-H for project 
cost). Aerial photos were performed by hired labor at 
a cost of $1,519. Water quality studies and analyses 
were performed by hired labor at a cost of $7,462. 
Inspection and report were performed by hired labor 
at a cost of $2,920. Project management for these 
activities was performed by hired labor at a cost 
of $28,616. 
9. NATIONAL EMERGENCY 
PREPAREDNESS 
Fiscal Year Costs of $154,917 were for: 
Training and Exercises $36,780 
Management and Mobilization Planning $118,137 
10. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Small Navigation Projects Not Specifically Authorized 
by Congress (Sec. 107 of the River and Harbor 
Act of 1960, as amended. Public Law 645, 86th Congress). 
Fiscal Year Costs 
Project and Location to September 30, 1987 
SBH Burns Waterway, IN 
Gary SBH, IN 
1. I)oes not include $251,805 Contributed Funds. 
$239,5731 
7,500 
BURNS WATERWAY SBH, IN 
Location. Northwestern Indiana on the southeast 
shore of Lake Michigan in Portage County, at 
the mouth of Burns Ditch, approx. 35 miles southeast 
of Chicago. (See NOAA Nautical Chart Numbers 
14905 and 14926.) 
Previous projects. None. 
Existing Projects. Provides for (a) a rubble 
mound west breakwater 1,003 feet long; (b) a rubble 
mound north breakwater 678 feet long; (c) channel 
improvement 5,200 linear feet, 145 cubic yard dredged 
and used for beach nourishment. 
Local Cooperation. Fully complied with. 
Terminal Facility. There are several marinas 
located at Burns Ditch. The commodities handled 
at this harbor are fresh fish. 
Operations and results during period. Monitored 
the dredge material disposal west of the breakwater 
at a cost of $2,101. 
Condition at the end of the fiscal year. Total 
cost of existing project to September 30, 1987 were 
30-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
$3,750,061, of which $3,747, 960 was for new work 
($1,981,288 Federal and $1,766,672 non-Federal), 
and $2,101 for maintenance. 
Alteration of Bridges 
11. OTHER AUTHORIZED BRIDGE 
ALTERATION 
See table 30-D. 
Beach Erosion Control 
12. CASINO BEACH, CHICAGO, IL 
Location. Casino Beach and jetty are located 
within Jackson Park, Chicago, Illinois. 
Existing Project. The project consists of major 
rehabilitation of the existing jetty with steel sheet 
piling, placement of new fill stone and armor stone 
anda new concrete cap. Estimated project cost (1987) 
is $5,710,000 for new work, including Federal cost of 
$2,710,000 and an additional $3,000,000 to be contributed 
by the local interests. Project was authorized 
by Section 501 of the Water Resources Development 
Act of 1986. 
Local Cooperation. Sec. 103 of the Water 
Resources Development act applies. The Chicago 
Park District has indicated by letter dated November 
15, 1982 that they will be the local sponsor for the 
project. 
Operations and results during period. None. 
Condition at the end of the fiscal year. Preconstruction 
planning and engineering has not 
been started. 
13. INDIANA DUNES NATIONAL 
LAKESHORE BANK PROTECTION, 
BEVERLY SHORES, IN 
Location. Northwestern Indiana, on the southeast 
shore of Lake Michigan in Porter County, 
approximately 35 miles southeast of Chicago Harbor. 
(see NOAA Nautical Charts Numbers 14095 and 
14926). 
Existing Projects. Provides for 13,000 feet of 
stone revetment and periodic repair of rip rap to maintain 
the full length of beach front at Beverly Shores, 
Indiana. The current project was authorized by 
Pulbic Law 7-88 and Public Law 98-63. 
Local Cooperation. Fully complied with. 
Operations and results during period. Plans 
and Specs were initiated for emergency repairs on 
the 13,000 feet existing revetment at a cost of $63,856. 
Emergency repairs of those areas where Lake Front 
Drive was threatened was performed by contract 
at a cost of $315,714. Contract administration and 
project management were performed by hired labor at 
a cost of $12,279 and $3,359, respectively. 
Condition at end of fiscal year. Total costs 
of existing project to 30 September 1987 were 
$1,055,208, of which $660,000 is for new work and 
$395,208 is for maintenance. 
14. INDIANA SHORELINE, IN 
Location. On the south end of Lake Michigan 
along a two-mile reach of shore west of Michigan City 
Harbor, Indiana. 
Existing Project. The project consists of beach 
nourishment of approximately two miles of beach 
between Michigan City Harbor and Beverly Shores, 
Indiana, requiring placement of 400,000 cubic yards 
of sand. Periodic replenishment averaging about 
70,000 cubic yards of sand at five year intervals would 
be required throughout the life of the project. The 
project was authorized for construction by Section 501 
of the Water Resources Development Act of 1986. 
Estimated Federal Cost (1987) for new work is 
$8,340,000. 
Local Cooperation. Sections 101 and 103 of the 
Water Resources Development Act of 1986 applies. 
In letter dated March 27, 1984, the City of Michigan 
City stated its willingness to act as local sponsor in 
the event that a local sponsor may be required at a 
future date. 
Operations and results during the period. 
Prior year work by the National Park Service was 
credited for $1,016. 
Condition at the end of the fiscal year. Preconstruction 
planning and engineering was initiated 
in fiscal year 1984. No additional work has been 
performed as the project is not in accordance with 
current administration policy. 
15. OTHER AUTHORIZED BEACH 
EROSION CONTROL PROJECTS 
See table 30-E. 
16. BEACH EROSION CONTROL 
UNDER SPECIAL 
AUTHORIZATION 
Beach erosion control activities pursuant to Section 
103 of the River and Harbor Act of 1962, as amended. 
Fiscal Year Costs 
Project and Location to September 30, 1987 
Langdon Park, Wilmette, IL $6,000 
North Chicago, IL 4,952 
Sunrise Park, Lake Bluff, IL 17,000 
Highland Park, Park Ave., WTP, IL 5,000 
30-6

CHICAGO, IL, DISTRICT 
Flood Control 
17. CHICAGO RIVER, IL (NORTH 
BRANCH) 
Location. Northern Illinois, in Cook and Lake 
Counties. 
Existing Project. Provides for clearing the 
channel of the North Branch of the Chicago River, 
Illinois, of fallen trees, roots, and other debris and 
objects which contribute to the flooding, unsightliness, 
and pollution of the river. The project extends 
from Wolf Point in Chicago, Illinois, to its source just 
south of Rockland Road east of Libertyville, Illinois. 
The project was authorized by the River and Harbor 
Act of 31 December 1970 (Section 116) and amended by 
the River and Harbor Act of 7 March 1974. 
Local Cooperation. The 1970 Act provided that 
local interests furnish without cost to the United 
States all lands, easements, rights-of-way, and disposal 
areas necessary for construction of the project; 
hold and save the United States free from damages 
due to construction; maintain and operate all works 
after completion without cost to the United States; 
and agree to bear all cost in excess of $200,000 for 
completing construction. Assurance of local cooperation 
for this act was approved on 31 July 1972. The 
1974 Act provided that the United States will maintain 
the channel free of trees, roots, debris and objects 
at a cost not to exceed $150,000 per year with non- 
Federal interests paying 25 percent of the cost of 
maintenance. 
Operations and results during period. 
Maintenance: E & D for FY 86 and FY 87 Debris 
Removal project was performed by hired labor at a 
cost of $29,883. Real Estate costs were $1,804. 
Condition at end of fiscal year. Total cost of 
existing project to September 30, 1987 were $1,958,772, 
of which $231,884 was for new work ($191,884 regular 
funds and $40,000 contributed funds) and $1,726,888 
was for maintenance ($1,337,899 Federal funds and 
$388,989 contributed funds). 
18. LAKE MICHIGAN, 
EDGEWATER/ROGERS PARK 
COMMUNITIES, CHICAGO, IL 
Location. On the Illinois Shore of Lake Michigan 
in City of Chicago (Cook County) from Hollywood- 
Ardmore Beach to Chicago-Evanston border. 
Existing Project. The project includes construction 
of a series of rubble mound revetments 
at the following street ends: Granville, Rosemont, 
and North Shore Avenues (approximate total of 340 
linear feet); offshore breakwaters, 100 feet long each, 
at Thorndale, Sherwin, Jarvis and Fargo Avenues 
and at Hartigan Park and Beach; 8,000 cubic yards 
beach nourishment placement at Rogers Park and 
Beach; a 40 foot seawall extension at Glenlake 
Avenue; and placement of 450 linear feet of rubble 
mound revetment at Berger Park. Planned construction 
activities at Devon Avenue were deleted at the 
local sponsor's request. The project was authorized 
by PL-99-190 Section 123 and amended by PL 99-591. 
Local Cooperation. The local sponsor is required 
to provide all lands, easements and rights of 
way, provide all required relocations, hold and save 
the United States from any damages due to construction 
or operation of the project, and contribute 
a minimum of twenty-five percent of the total project 
costs. The local sponsorship for Phase I (the completed 
activities) was shared by the City of Chicago 
and the Chicago Park District. The Chicago Park 
District will be the sole sponsor for the Phase 2 
actions, currently under design. 
Operations and results during period. New 
Work: Construction of the first phase, which included 
breakwaters at Thorndale, Jarvis and Fargo Avenues, 
rubble mound revetments at Granville, 
Rosemont, and North Shore Avenues and the seawall 
extension at Glenlake Avenue, were completed. 
During the year a total of $1,457,879 ($1,174,867 
Federal and $283,012 non-Federal) was expended for 
Phase I. Of this total, contract costs were $1,051,474 
Federal and $203,035 non-Federal; in-house engineering 
and design costs were $44,453 Federal and 
$39,332 non-Federal; real estate management cost 
were $4,500 Federal and $2,500 non-Federal; supervision 
and administration costs were $74,440 Federal 
and $38,145 non-Federal. Construction of the rubble 
mound revetment at Berger Park was completed at a 
total cost of $333,397 ($251,670 Federal and $81,727 
non-Federal). Of this total, contract costs were 
$228,493 Federal and $76,164 non-Federal; in-house 
engineering and design costs were $5,295 Federal 
and $1,465 non-Federal; real estate management 
costs were $1,000 Federal; supervision and administrtation 
was $16,882 Federal and $4,098 non-Federal. 
Plans and specifications were initiated for Phase II 
which includes breakwaters at Hartigan Park and 
Beach and Sherwin Avenue and beach nourishment 
at Rogers Park and Beach at a cost of $50,066 for 
contract, $23,032 for hired labor and $6,465 for real 
estate management services. 
A summary of total Federal costs by location is 
as follows: 
Fiscal Year Cost 
Project and Location 30 September 1987 
Phase I - Completed Construction 
Lake Michigan-Granville Ave., Chicago, IL $ 76,641 
Lake Michigan-Glenlake Ave., Chicago, IL 19,000 
Lake Michigan-Thorndale Ave., Chicago, IL 301,320 
ILake Michigan-Rosemont Ave., Chicago, IL 218,162 
Lake Michigan,North Shore Ave.,Chicago, IL 84,366 
Lake Michigan-Fargo Ave., Chicago, IL 223,900 
ILake Michigan-Jarvis Ave., Chicago, IL 251,479 
Lake Michigan-Berger Park, IL 251,670 
$1,426,538 
30-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Phase II- Currently under design 
Lake Michigan, Edgewater/Rogers Park $ 79,563 
(Devon & Sherwin Ave., Rogers and 
Hartigan Park), IL 
Condition at the end of the fiscal year. The 
existing project is 70 percent complete. Total costs 
of existing project to September 30, 1987 were 
$1,983,637 for new work ($1,618,898 Federal and 
$364,739 contributed funds). 
19. LITTLE CALUMET RIVER, IN 
Location. Little Calumet River is located in 
northwest Indiana between the Illinois-Indiana 
state line and the Conrail Railroad in east Gary, 
Indiana. 
Existing Project. The project consists of replacing 
22 miles of levees between the Illinois- 
Indiana state line and Cline Avenue; construction of 
12 miles of levees in Gary; a diversion structure at 
Hart Ditch; permanent evacuation of 20 structures in 
the Black Oak area of Gary; flood proofing 39 residential 
structures in Gary; modifying 4 miles of channel; 
modifying 4 highway bridges; construction of 14 
miles of hiking trails and accompanying recreation 
support facilities, and preservation of 788 acres of 
wetlands with wildlife mitigation measures., Estimated 
Federal cost (1987) for new work is $56,600,000 
and $20,200,000 to be contributed by local interests. 
Project was authorized by Section 401 of the Water 
Resources Development Act of 1986. 
Local Cooperation. Section 103, Water Resources 
Development Act of 1986 applies. By letter 
dated June 22, 1981, the Little Calumet River Basin 
Development Commission forwarded a resolution 
passed by the Commission affirming its understanding 
of the general items of local cooperation 
and indicating tentative willingness to act as local 
sponsor. By letter dated May 2, 1986, the Commission 
expressed its willingness to meet the non-Federal 
project sponsor requirements. The Commission is 
aware of the PL 99-662 cost-sharing requirements. 
The District Engineer believes that the Commission 
would have the ability to provide the local cooperation 
requirements for this project. 
Operations and results during period. New 
work: Continuation of Planning and Engineering was 
continued at a cost of $2,119. Advance Engineering 
and Design was initiated at a cost of $241,285. 
Condition at the end of the fiscal year. Preconstruction 
planning is in progress. Total costs of 
existing project to September 30, 1987 were $1,278,285 
for new work. 
20. LITTLE CALUMET RIVER 
BASIN (CADY MARSH DITCH) IN 
Location. Cady Marsh Ditch, a tributary to 
the Little Calumet River in Lake County, Indiana, 
is about 6 miles long and drains about 17 square 
miles. 
Existing Project. The project consists of channel 
improvements within the town of Griffith, Indiana 
and construction of a diversion from the ditch to the 
main stream of the Little Calumet River. Interior 
drainage would be part of the project. 
Local Cooperation. Sec. 103, Water Resources 
l)evelopment Act of 1986 applies. The town of Griffith, 
Indiana, has agreed to be the local sponsor of the 
project by a resolution of the town board of trustees 
unanimously adopted in June 1973 and reaffirmed by 
an unanimous resolution in November 1977. Informal 
contacts since then have indicated that the position 
of the town has not changed. 
Operation and results during period. None. 
Conditions at the end of the fiscal year. Preconstruction 
Planning and Engineering has not 
started. 
21. NORTH BRANCH, 
CHICAGO RIVER, IL 
Location. The North Branch Chicago River 
Basin is located north of the City of Chicago in 
suburban Cook and Lake Counties. 
Existing Project. The project consists of constructing 
two excavated floodwater storage reservoirs 
on the West Fork and one excavated reservoir on the 
Middle Fork. The Water Resources I)evelopment Act 
of 1986, Section 401, also includes authorization to 
reimburse non-Federal interests 50 percentof the costs 
of planning and construction for three existing 
reservoirs on the West Fork, known as Techny reservoirs, 
and the existing Mid Fork reservoir on the 
Middle Fork. Reservoir 27 in the Village of Brannockburn, 
the first reservoir to be constructed, will be built 
on the West Fork 12.7 miles above its confluence with 
the North Branch Chicago River. It will have a floodwater 
storage capacity of 525 acre-feet. Excavation 
for the reservoir will be approximately 48 feet deep. 
Approximately 700 feet of the West Fork channel will 
be improved and relocated for construction of the 
diversion structure. The second reservoir to be constructed, 
Reservoir 29A, will be built 9.6 miles above 
the mouth of the West Fork and 3.1 miles south of 
Reservoir 27. The reservoir floodwater storage capacity 
is 575 acre feet. Site 29A is located near the Village 
of' )eerfield in unincorporated Cook County. Two 
project features, the channel relocation and construction 
of two bridges, will be accomplished by 
private or local governmental interests prior to construction 
of the reservoir at Site 29A. The last reservoir 
to be constructed, Reservoir 15, will be located 
near the City of Green Oaks on the Middle Fork, 22.1 
miles above its confluence with the North Branch 
Chicago River. The design floodwater storage capacity 
is 500 acre-feet. The excavated reservoir 
will be approximately 42 feet deep except in the sedimentation 
pool area which will be about 15 feet deeper. 
Channel improvements and relocation of about 800 
feet of the channel will be required for construction 
of the diversion structure at the north end of the 
reservoir. Estimated Federal cost (1987) for new work 
30-8

CHICAGO, IL, DISTRICT 
is $16,600,000. An additional $8,200,000 will be contributed 
by local interests. Project was authorized 
by the Water Resources Development Act of 1986 
(H. Doc 100-72 100th Congress, 1st session). 
Local Cooperation. By letter dated August 2, 
1983, the Director of the Illinois Division of Water 
Resources has indicated that the State of Illinois will 
provide the lands required for the project. The Director 
also stated that the Lake County Forest Preserve 
District and the Village of Deerfield will operate and 
maintain the reservoirs. The Director has stated in 
conversations with the Chicago District that the State 
will be willing to participate in the cost sharing plan 
required by Section 103 of the Water Resources Development 
Act of 1986. The local cooperation agreement 
for Reservoir 27 is scheduled to be executed 
in January 1988. 
Operation and results during period. New 
work: Continuation of Planning and Engineering 
was continued at a cost of $3,071. Advance Engineering 
and Design was initiated at a cost of $306,554. 
Condition at the end of the fiscal year. Preconstruction 
planning is in progress. Total costs 
of the project through September 30, 1987 were 
$1,175,553 for new work. 
22. O'HARE RESERVOIR, IL 
Location. The reservoir will be located in an 
unincorporated portion of Elk Grove Township in 
northwestern Cook County, Illinois about 1 mile 
northwest of Chicago O'Hare International Airport. 
Existing Project. The project consists of a 1,050 
acre-foot capacity reservoir, excavated to a depth of 
80 feet. The reservoir would be constructed at the 
terminus of the existing system of 6.6 miles of deep 
tunnels, recently constructed under the U.S. Environmental 
Protection Agency and the Metropolitan 
Sanitary District of Greater Chicago Tunnel and 
Reservoir Project (TARP). Estimated project cost 
(1987) is $18,500,000 including Federal cost for new 
work of $13,900,000 and $4,600,000 to be contributed 
by local interests. Project was authorized by Section 
401 of the Water Resources Development Act of 1986. 
Local Cooperation. Sec. 103 of the Water Resources 
Development Act of 1986 applies. By letter 
dated 12 April 1984, the Metropolitan Sanitary District 
of Greater Chicago stated it would be the local 
project sponsor and provide the required local 
cooperation. 
Operations and results during period. New 
work: Advance Engineering and DI)esign was initiated 
at a cost of $39,587. 
Condition at the end of the fiscal year. Preconstruction 
planning is in progress. Total costs of 
the existing project to September 40, 1987 were $39,587 
for new work. 
23. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See table 30-F. 
24. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency flood control activities-repair, flood 
fighting and rescue work (Public Law 99, 84th Cong. 
and antecedent legislation). 
Program 
Disaster Preparedness 
Rehabilitation 
Emergency Operations 
Advance Measures 
Fiscal Year Costs 
to September 30, 1987 
$197,794
0 
144,413 
375,156 
Emergency bank protection (Sec. 14 of the 1946 
Flood Control Act Public Law 526. 79th Congress). 
Fiscal Year Costs 
Project and Location to September 30, 1987 
Lake Michigan, Sunrise Park, Lake Bluff, IL $10,668 
Lake Michigan, Lake Forest, IL 126,409 
Lake Michigan, Berger Park, Cook Co., IL 120 
Lake Michigan, Beverly Shores Road, IN 7,500 
Lake Michigan, Long Beach, LaPorte Co., IN 7,681 
Rosewood Beach Bath House, 
Highland Park, IL 195,081 
Batavia, IL 1,500 
Dune Acres, IN 8,900 
Duneland Beach, LaPorte Co., IN 8,900 
Lake Michigan, Lake Shore, Fullerton, IL 10,000 
Lake Michigan, Temple Emanuel, IL 33,042 
Flood control activities pursuant to Section 205 of 
Flood Control Act of 1845, as amended. 
Fiscal Year Costs 
Project and Location to September 30, 1987 
Fox River, McHenry County, IL $ 63,937 
Northfield, IL 7,500 
Libertyville Estates, IL 56,370 
Valleyview, IL 19,446 
Wilmington, IL 139,750 
Will Co., IL 3,300 
General Investigations 
25. SURVEYS 
Fiscal year costs were $1,731,656 itemized as follows: 
Navigation Studies 
Flood I)amage Prevention Studies 
Shoreline Protection Studies 
Special Studies 
Special Investigations 
Coordination Studies 
Supplemental Pre-authorization 
$ 0 
124,780 
240,038 
151,647 
33,000 
26,000 
186,006 
26. COLLECTION AND STUDY OF 
BASIC DATA 
Fiscal year costs of $130,000 were for: 
Flood Plain Management Services 
Hydrologic Studies 
$128,000 
2,000 
30-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
27. CONTINUATION OF PLANNING 
AND ENGINEERING 
Costs during the period were $4,175. For details, 
see section 14, 19 and 21 in text. 
28. ADVANCE ENGINEERING 
AND DESIGN 
Costs during the period were $587,426. For details, 
see sections 19, 21 and 22 in text. 
Miscellaneous 
29. LAKE GEORGE, HOBART, IN 
Location. Lake George in Hobart, Indiana and 
the Deep River watershed upstream of the lake 
through Lake Station, Indiana. 
Existing Project. The project consists of the 
removal of approximately 900,000 cubic yards of silt, 
aquatic growth and other material and the construction 
of silt traps or other devices to prevent and abate 
the deposition of sediment. Estimated cost (1987) for 
new work is $3,750,000 Federal and $1,250,000 is to 
be contributed by local interests. Project was authorized 
by Section 602 of the Water Resources Development 
Act of 1986. 
Local Cooperation. Section 602(b), Water 
Resources Development Act of 1986 applies. 
Operations and results during period. None. 
Condition at the end of the fiscal year. No 
work has been initiated. 
30-10

CHICAGO, IL, DISTRICT 
TABLE 30-A COST AND FINANCIAL STATEMENT 
See Total to 
Section September 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 30, 1987 
1. Burns Waterway New Work: 
Harbor, IN 
(Federal Funds) 
(Contributed 
Funds) 
2. Calumet Harbor 
arid River, IL 
and IN 
(Federal Funds) 
(Contributed 
Funds) 
3. Chicago Harbor, 
IL 
(Federal Funds) 
4. Chicago River, IL 
5. Indiana Harbor, 
IN 
6. Michigan City 
Harbor, IN 
(Contributed 
Funds) 
7. Waukegan 
Harbor, IL 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Cost 
Maint.: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
New Work: 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
0 
4,732 
90,000 
70,306 
150,000 
169,592 
13,584,000 
13,584,000 
80,000 4,034,793 
58,181 4,012,872 
15,900 
15,900 
22,578,5671 
22,578,5671 
639,000 2,679,000 
2,478,072 2,330,158 
842,500 
1,446,975 
530,000 
1,225,815 
985,000 
1,399,456 
685,000 1,507,000 
653,159 1,488,154 
431,000 
385,246 
970,000 
941,516 
368,500 24,234,2742 
337,350 24,164,4222 
350,000 1,039,0013 
237,488 926,4893 
836,667 
836,667 
4,788,8274 
4,788,8274 
905,000 11,185,286 
957,037 11,142,264 
1,326,600 
1,326,600 
1,500,5655 
1,500,5655 
738,000 9,373,7376 
694,096 9,238,3996 
4,897,1487 9 
4,897,1487 9 
236,123 1,365,000 
434,483 1,075,541 
981,000 
1,224,393 
395,000 8,664,7788 
293,094 8,507,7968 
1,543,646 ' � 
1,543,64610 
20,000 
18,685 
0 
1,315 
25,000 1,292,000 5,957,512 
22,484 1,115,432 5,778,428 
1,618,670 
1,618,670 
30,800 
30,800 
823,02611 
823,026" 
566,671 
504,344 
507,000 
309,456 
380,000 
753,002 
300,000 6,067,98012 
158,224 5,916,05712 
30-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 30-A (Cont'd) COST AND FINANCIAL STATEMENT 
See Total to 
Section September 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 30, 1987 
10. Burns Waterway New Work: 
Small Boat Approp. 
Harbor, IN Cost 
(Federal Funds) 
Maint.: 
Approp. 
Cost 
(Contributed New Work: 
Funds) Contrib. 
Cost 
13. Indiana Dunes New Work: 
National Lake- Approp. 
shore, Beverly Cost 
Shores, IN 
Maint.: 
Approp. 
Cost 
14. Indiana Shore- New Work: 
Line, IN Approp. 
Cost 
17. Chicago River, IL New Work: 
North Branch Approp. 
(Federal Funds) Cost 
Maint.: 
Approp. 
Cost 
(Contributed New Work: 
Funds) Approp. 
Cost 
Maint.: 
Approp. 
Cost 
18. Lake Michigan- New Work: 
Edgewater/ Approp. 
Rogers Park Cost 
Communities, 
Chicago, IL 
(Federal Funds) 
(Contributed New Work: 
Funds) Approp. 
Cost 
19. Little Calumet New Work: 
River, IN Approp. 
Cost 
21. North Branch New Work: 
Reservoir Approp. 
Chicago River, IL Cost 
22. O'Hare Reservoir, New Work: 
Chicago, IL Approp. 
Cost 
737,000 
656,193 
539,000 
573,128 
450,000 1,092,500 
0 911,640 
00 
00 
107,000 
63,280 
50,000 
78,167 
60,000 
5,956 
227,000 
123,780 
159,000 
92,025 
0 
33,720 
230,000 
243,775 
60,0( 
74,41 
450,0( 
444,8 
331,0( 
383,64 
270,000 
107,727 
135,000 
603,227 
9,9 c
00 
0 
99 
66,000 
137,171 
00 96,898 
15 26,458 
0 121,000 
0 113,972 
00 360,000 
34 466,267 
00 379,000 
37 390,216 
0 1,987,000 
239,573 1,981,288 
30,000 30,000 
2,101 2,101 
89,172 1,766,672 
251,805 1,766,672 
0 660,000 
571,486 660,000 
467,500 467,500 
395,208 395,208 
0 107,000 
-1,016 105,983 
191,884 
191,884 
20,000 1,363,000 
31,687 1,337,899 
40,000 
40,000 
0 516,898 
0 388,989 
1,621,200 1,742,200 
1,506,101 1,620,073 
380,000 
364,739 
288,000 
243,404 
315,000 
309,626 
85,000 
39,587 
380,000 
364,739 
1,325,000 
1,278,285 
1,184,000 
1,175,554 
85,000 
39,587 
1. Includes $855,973 for previous projects 
2. Excludes contributed funds in settlement pursuant 
to decree (No. 54-C-1608) regarding removal of flue dust 
and includes $45,230 for previous projects. 
3. Includes $689,001 in settlement pursuant to decree 
(No. 54-C-1608) regarding removal of flue-dust. 
4. Includes $446,005 for previous projects. 
5. Includes $955,886 for previous projects. 
6. Includes $109,463 for previous projects. 
7. Includes $60,668 for previous projects. 
8. Includes $2,509 for previous projects. 
9. Excludes $12,500 contributed funds. 
10. Includes $287,389 for previous projects. 
11. Includes $218,233 on previous projects. 
12. Includes $15,711 on previous projects. 
30-12

CHICAGO, IL DISTRICT 
TABLE 30-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Oct. 27, 1965 
Mar. 3, 1899 
June 13, 1902 
Mar. 3, 1905 
June 25, 1910 
Sept. 22, 1922 
Aug. 30, 1935' 2 
Aug. 30, 19351 2 
Mar. 2, 19453 
July 14, 1960 
Oct. 23, 1962 
Oct. 27, 1965 
July 11, 1870 
June 14, 1880 
Mar. 3, 1899 
July 25, 1912 
Mar. 2, 1919 
Mar. 3, 1931 
Mar. 2, 1945 
Oct. 23, 1962 
Dec. 4, 1981 
July 30, 1983 
Mar. 3, 1899 
June 13, 1902 
BURNS WATERWAY HARBOR, IN 
(See Section 1 of Text) 
Provides for breakwater and channel to present dimensions and 
depths; North Breakwater, West Bulkhead, Approach Channel 
and Outer Harbor, East and West Harbor Arms. 
CALUMET HARBOR AND RIVER, IL AND IN 
(See Section 2 of Text) 
Outer harbor protected by breakwaters. 
Five turning basins. 
Provided for shape and dimensions of turning basins. 
Consolidated the 2 projects for Calumet Harbor and Calumet 
River. 
Detached breakwater, dredging outer harbor to existing 
project depth and dimensions; deepen river-entrance channel 
and river to existing project depths; widen and straighten river 
channel; 5 turning basins to same depth as adjacent channel. 
Dredging area A and B in south end of Lake Calumet and an 
entrance channel 300 feet wide to 21 feet deep. 
An approach channel to harbor 3,200 feet wide and 28 feet 
deep through shoals outside breakwater and closing existing 
gap between breakwaters. 
Depth of 29 feet in lake approach to 28 feet in outer harbor, and 
27 feet in river entrance up to E.J. & E. Ry. Bridge. 
Deepen, widen, and straighten channel in Calumet River from 
E.J. & E. Ry. Bridge, to and including turning basin 5, to a 
depth of 27 feet in earth and 28 feet in rock; deepen turning 
basins 1, 3 and 5 to 27 feet; enlarge turning basins 3 and 5; a 
channel into Lake Calumet to 27 feet deep for 3,000 feet and a 
width of 1,000 feet; and eliminate turning basins 2 and 4 
from project. 
Modification of Act of Oct. 23, 1962. Protection for Elgin, Joliet 
and Eastern Railway Bridge over the Calumet River, to 
permit dredging to full width of the south draw to depth of 27 
feet, and temporary protection for center pier and south abutment 
of the New York, Chicago, and St. Louis Railroad Bridge 
(Nickle Plate) to permit dredging of full with of south bridge 
draw to depth of 27 feet prior to its replacement. 
CHICAGO HARBOR, IL 
(See Section 3 of Text) 
Inner breakwaters and inner basin. 
Exterior Breakwater. 
Present project depth in basin, and entrance to Chicago River. 
Shore-arm and southerly extension of exterior breakwater. 
Modification of area to be dredged in inner basin. 
Shore-arm extension of exterior breakwater transferred to 
Lincoln Park Commissioners. 
Resumption of jurisdiction over shore-arm extension breakwater 
and over certain navigable waters in Lake Michigan 
which lie in northwestern part of outer harbor. 
Deepen a lake approach channel to 29 by 800 feet wide for 
6,600 feet; and deepen a channel and maneuver area inside 
harbor entrance to 28 by 1,300 feet wide. 
Provides for lock operations and maintenance responsibilities 
in the interests of navigation. 
CHICAGO RIVER, IL 
(See Section 4 of Text) 
For project depth of 21 feet in lieu of that fixed by act of 
June 3, 1896. 
Turning basins. 
Public Law, 89-298, H. Doc. 160, 
88th Cong., 1st sess. 
Annual Report, 1896, pp. 2584 et 
Seq. and H. Doc. 277, H. 
54th Cong., 1st sess. 
H. Doc. 172, 54th Cong., 2d sess. 
H. Doc. 349, 60th Cong., 1st sess. 
H. Doc. 494, 72d Cong., 2nd sess. 
H. Doc. 180, 73rd Cong., 2d sess. 
H. Doc. 233, 76th Cong., 1st sess. 
H. Doc. 149, 86th Cong., 1st sess. 
H. Doc. 581, 87th Cong., 2d sess. 
H. Report No. 973, 89th Cong., 
1st sess. 
H. Ex. Doc. 114, 41st Cong., 2d 
sess., and Annual Report 1879, 
pp. 1562-1567 
Annual Report, 1870, pp. 1562- 
1567 
Annual Report 1897, pp. 2790- 
2791 
H. Doc. 710, Cong., 2d sess. 
H. Doc. 1303, 64th Cong., l st sess. 
Public Law 797, 71st Cong. 
Public Law 14, 79th Cong. 
H. Doc. 485, 87th Cong., 2d sess. 
Section 107 of 
Public Law 97-88 
Public Law 98-63 
Specified in act. 
Specified in act. 
30-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 30-B (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 2, 1907 
Mar. 2, 1919 
July 24, 1946 
Nov. 17, 1986 
June 25, 1910 
Mar. 4, 1913 
Mar. 2, 1919 
Mar. 20, 1922 
Mar. 3, 1925 
Mar. 2, 1929 
July 3, 193010 
July 30, 1932 
Aug. 30, 193511 
Aug. 26, 1937 
July 14, 1960 
Oct. 27, 196512 
Mar. 3, 1889 
Mar. 3, 1905 
Jan. 21, 1927 
Interpreted by Chief of Engineers, April 11, 1908 as adopting 
new work of the then existing project for 21-foot depth. 
Eliminated all work except maintenance of main river. 
Dredging channel 9 feet deep to within 30 feet of existing 
bulkheads and river banks from North Ave. to Belmont 
Ave., thence 9 feet deep and 50 feet wide to Addison St. 
Responsible for Monitoring of Lake Michigan Diversion 
INDIANA HARBOR, IN 
(See Section 5 of Text) 
Maintenance of outer harbor. Maintenance of inner harbor 
channel when deeded free of cost to and accepted by the 
United States. 
Breakwaters. 
Lighthouse crib, present length and alignment easterly and 
northerly breakwaters. 
Reduce length of channel to be maintained in extension to 
Lake George. 
Authorized Secretary of War to modify project so far as relates to 
length and alignment of breakwaters and to sell Youngstown 
Sheet and Tube Co. about 1,180 linear feet of shoreward end of 
existing north breakwater. 
Accept 2.3 acres of land for construction of the Forks Turning 
Basin. 
Existing project channel width and depth in Lake George 
Branch and turning basin at the Forks. 
Authorized Secretary of War to sell Inland Steel Co., about 1,903 
linear feet of southerly end of existing east breakwater. 
Extended easterly breakwater, dredge entrance channel and 
outer harbor, deepen channel between bulkhead fills, widen 
main stem of canal and portion of Calumet River Branch to 
141st St. 
Modified conditions of local cooperation required before 
enlargement of Indiana Harbor Canal is undertaken by 
United States. 
Increase authorized depths of 29 feet in outer harbor entrance 
channel; 28 feet in outer harbor, and 27 feet in canal entrance 
channel to first E.J. & E. Ry. Bridge. 
Deepen main canal from landward end of canal entrance 
channel to a point lakeward of Dickey Place Bridge over a 
modified channel width of 190 feet, except through bridge 
openings. 
MICHIGAN CITY HARBOR, IN 
(See Section 6 of Text) 
East breakwater and old east pier inclosing the outer basin. 
Extension of east pier. 
Extend east pier and construct detached breakwater. 
Lower turning basin. 
Rebuild west pier as at present located. 
Present project dimensions of entrance channel. 
Existing project depth in channel, and in lower and middle 
turning basins, eliminated improvement of Trail Creek above 
middle turning basin and uncompleted portion of detached 
breakwater, abandonment of old east breakwater and old east 
pier inclosing outer basin. 
H. Doc. 95, 56th Cong., 1st sess. 
(Annual Report, 1900, p. 3863 
and Annual Report, 1909, 
p. 709) 
H. Doc. 1294, 64th Cong., 1st sess. 
H. Doc. 767, 78th Cong., 2d 
sess.6 7 
Section 1142, Water Resources 
Development Act of 1986 
H. Doc. 1113, 60th Cong., 2d sess. 
H. Doc. 690, 62d Cong., 2d sess. 
Rivers and Harbors Committee 
Doc. 6, 65th Cong., 2d sess. 
Public Law 176, 67th Cong. 
Rivers and Harbors Committee 
Doc. 21, 71st Cong., 2d sess. 
Public Law 219, 72d Cong. 
Rivers and Harbors Committee 
Doc. 29, 72d Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 13, 75th Cong., 1st sess. 
H. Doc. 195, 86th Cong., 1st sess. 
H. Doc. 227, 89th Cong., 1st sess. 
Recommendations of a Board of 
Engineers, Annual Report, 
1870, p. 123. 
Reports of Boards of Engineers, 
Annual Report, 1851, pp. 
2187-2189; Annual Report 
1882, pp. 2264-2266. 
Annual Report, 1897, pp. 2903- 
2904. 
Joint resolution of Congress 
approved May 13, 1908. 
Public Law 23. 
H. Doc. 279, 69th Cong., 1st sess. 
30-14

CHICAGO IL, DISTRICT 
TABLE 30-B (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 30, 1935 
Sept. 30, 1966 
Sec. 107 
June 14, 1880 
Aug. 3, 1882 
June 13, 1902 
July 3, 1930 
Mar. 2, 1945 
Dec. 17, 1970 
Sec. 201 
Oct. 27, 1965 
Nov. 17, 1986 
Dec. 4, 1981 
July 30, 1983 
Dec. 15, 1985 
Nov. 17, 1986 
Restore and repair westerly 1,000 feet of east breakwater, 
dredging outer basin, and enlarging entrance to basin 
through east pier. 
Dredge river channel 50 feet wide and 6 feet deep from upper 
turning basin to E Street bridge. 
WAUKEGAN HARBOR, IL 
(See Section 7 of Text) 
Parallel piers and basins.9 
Modified location of harbor entrance. 
Detached breakwater, extend piers, increase width of harbor at 
inner end of north pier, and dredge channel and basin to depth 
of 20 feet. 
Extension of breakwater to shore, dredging near outer end of 
north piers and enlarging inner basin. 
Dredge an entrance channel to existing project dimensions from 
outer end of north pier to project depth in lake, and dredge an 
anchorage area in southwest corner of inner basin to existing 
project depth. Abandonment of dredging triangular area in 
southwest corner of inner basin to 18 feet deep. 
Provides for deepening the existing entrance channel in the 
outer harbor to 25 feet and extending it to the depth in Lake 
Michigan, at widths varying from 380 feet to 500 feet; 
deepening the channel between piers to a depth of 23 feet at a 
width of 180 feet, and deepening the inner basin to 23 feet and 
extending its limits approximately 275 feet northward. 
CASINO BEACH, IL 
(See Section 12 of Text) 
Provides for shore protection repairs to the existing jetty. 
INDIANA DUNES NATIONAL LAKESHORE, IN 
BEVERLY SHORES, IN 
(See Section 13 of Text) 
Provides for emergency shore protection repairs to stone 
revetment initially constructed in 1973. 
Provides for operations and maintenance of the shore protection 
measures. 
LAKE MICHIGAN-EDGEWATER/ROGERS PARK 
COMMUNITIES, CHICAGO, IL 
(See Section 18 of Text) 
Provides for emergency bank stabilization, shore protection 
and flood control work. 
LITTLE CALUMET RIVER, IN 
(See Section 19 of Text) 
Provides for levee construction, a diversion control structure 
at the mouth of Hart Ditch, permanent evacuation of a 
portion of the Black Oak area of Gary and non-structural 
flood proofing measures in Gary. 
Rivers and Harbors Committee 
Doc. 34, 74th Cong., 1st sess. 
through east pier. 
Detailed Project Report June 
1965.8 
Annual Report, 1880, p. 142 
Annual Report, 1882, pp. 277, 
2162. 
H. Doc. 343, 56th Cong., 1st sess. 
Rivers and Harbors Committee 
Doc. 27, 71st Cong., 2d sess. 
H. Doc. 116, 77th Cong., 1st sess. 
H. Doc. 368, 90th Cong., 2d sess. 
Sec. 501, Water Resources 
Development Act of 1986. 
Public Law 97-88 
Public Law 98-63. 
Public Law 99-190 amended. 
Sec. 401, Water Resource 
Development Act of 1986. 
30-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 30-B (Cont'd) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
LITTLE CALUMET RIVER BASIN, (CADY) 
MARSH DITCH), IN 
(See Section 20 of Text) 
Nov. 17, 1986 Provides for channel improvements and construction of a Sec. 401, Water Resources 
diversion from the ditch to the Little Calumet River. Development Act of 1986. 
NORTH BRANCH CHICAGO RIVER, IL 
(see Section 17 and 21 of Text) 
Nov. 17, 1986 Construction of three reservoirs and reimbursement to locals H. Doc. 100-72, 100th Cong., 
for 50 percent of the costs for Techny and Mid-Fork reservoirs. 1st sess., Sec. 401, Water Resources 
Development Act 
of 1986. 
Dec. 31, 1970 Clearing fallen trees, roots and other debris and objects which River and Harbor Act. (Sect. 116) 
contribute to flooding. 
O'HARE RESERVOIR, CHICAGO, IL 
(See Section 22 of Text) 
Nov. 17, 1986 Provides for a 1,050 acre foot excavated reservoir. Sec. 401, Water Resources 
LAKE GEORGE, HOBART, IN Development Act of 1986. 
(See Section 29 of Text) 
Nov. 17, 1986 Provides for removal of silt, acquatic growth and construction Sec. 602, Water Resources 
of silt traps. Development Act of 1986. 
1. Included in Public Works Administration Program 
Sept. 6, 1943, and Dec. 16, 1933. 
2 Uncompleted portion was deauthorized in 1977 
(dredging in front of U.S. Steel Corp.) 
3. Uncompleted portion was deauthorized in 1977 
(breakwater closure). 
4. Contains latest map of harbor. Uncompleted portion 
is inactive. 
5. Contains latest map of river. 
6. Latest published map is an Annual Report for 1914, 
opposite p. 2928. 
7. Contains latest published map of North Branch above 
above North Ave. 
8. Contains latest published map. 
9. Completed under previous project. 
10. Uncompleted portion was deauthorized in 1977 
(widen and deepen Lake George Branch). 
11. Included in Public Works Administration Program 
Sept. 6, 1933, and July 25, 1934. Uncompleted portion was 
deauthorized in 1977 (widen and deepen main canal and 
Calumet River Branch). 
12. Project deauthorized in 1977. 
30-16

CHICAGO, IL. DISTRICT 
EXISTING PROJECTS 
See 
Section Length Width Depth 
in Text Project Item (feet) (feet) (feet) 
1. Burns Waterway 
Harbor, IN 
2. Calumet Harbor 
and River, IL 
and IN 
3. Chicago Harbor, 
IL 
4. Chicago River, 
IL 
5. Indiana Harbor, 
IN 
6. Michigan City 
Harbor, IN 
7. Waukegan Harbor, 
IL 
North Breakwater 
Outer West Bulkhead 
Approach Channel 
Outer Harbor 
East Harbor Arm 
West Harbor Arm 
Northerly Crib Breakwater 
Southerly Steel Breakwater 
North Pier 
Approach channel 
Outer Harbor 
River entrance 
Elgin, Joliet & Eastern Railway Bridge 
to turning basin No. 3 
Turning basin No. 3 to turning basin No. 5 
Approach into Lake Calumet 
Extension into Lake Calumet 
Turning basins 1, 3, and 5 
Shore arm extension 
Exterior breakwater 
Exterior breakwater southerly ext. 
North inner breakwater 
South inner breakwater 
North pier 
Approach channel 
Channel and maneuver area 
Lock 
Inner basin 
Entrance channel 
Main branch of Chicago River 
North Branch of Chicago River 
North Branch Canal 
North Branch Turning Basin 
Northerly Breakwater 
Easterly Breakwater 
Approach Channel 
Outer Harbor 
Entrance Channel 
Main Canal 
Turning Basin 
Lake George Branch 
Calumet River Branch 
Detached breakwater 
West pier 
East pier 
East breakwater 
Entrance channel 
Main channel 
Outer basin 
Trail Creek 
Trail Creek 
North breakwater and Shore Connection 
North pier and North Revetment 
South pier 
Entrance Channel 
Channel to inner basin 
Inner basin 
Anchorage Area 
4.646 
3,476 
2,200 
3,700 
2,100 
3,800 
6,714 
5,007 
2,450 
9,700 
10,500 
3,000 
21,100 
8,000 
4,000 
3,000 
2,250 
5,421 
4,944 
4,034 
2,544 
960 
6,600 
2,200 
600 
1,270 
7,300 
3,800 
11,100 
5,500 
1,120 
2,525 
7,200 
4,200 
3,600 
7,400 
3,700 
2,500 
1,304 
835 
2,276 
1,000 
1,900 
2,400 
900 
3,000 
2,300 
1,896 
2,074 
3,111 
3,250 
1,700 
1,650 
400 
Varies 
620 
620 
3,200 
3,000 
290 
200 
and variable 
Variable 
400 
1,000 
800 
1,300 
80 
740 
190-470 
190-390 
91-390 
56-210 
800 
Varies 
65-280 
61-210 
64-160 
160-260 
150-425 
120-150 
900 
50-100 
50 
390 
200 
375-500 
'Area of about 6 acres. 
30-17 
TABLE 30-C 
30 
28 
27 
27 
29 
28 
27 
27 
earth 
28 
rock 
27 
27 
27 
27 
29 
28 
23 
21 
21 
21 
21 
21 
21 
29 
28 
27 
22 
22 
22 
22 
18 
18 
8-12
86 
22 
1F 
18
8

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 30-D OTHER AUTHORIZED BRIDGE ALTERATION 
(See Section 11 of Text) 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Report For Construction Maintenance 
Calumet River Bridges' 1967 $1,625,068 
'Transferred to Department of Transportation in accordance with Section 6(g) of the Act of October 16, 1966, P.L. 89-670. 
TABLE 30-E OTHER AUTHORIZED BEACH EROSION PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Report For Construction Maintenance 
Mt. Baldy, Indiana Dunes National 
Lakeshore, IN 1984 $1,500,000 
Hollywood-Ardmore Beach 
Chicago, IL 1982 237,271 
Evanston, IL 1979 766,052 
Lake Michigan--Lake Bluff, IL 1976 244,889 
Lake Michigan-Lake Forest, IL' 1975 65,611 
'Authorized by River and Harbor Act of 1954. 
OTHER AUTHORIZED 
TABLE 30-F FLOOD CONTROL PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Report For Construction Maintenance 
Little Calumet River, IL 1984 583,000 
TABLE 30-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report For Deauthorized Expended Expended 
KANKAKEE RIVER, IL AND IN 
Levee between Shelby Bridge and 
Baum's Bridge in IN 1938 Nov. 17, 1986 
LITTLE CALUMET RIVER, IL AND IN 
Little Calumet River and Tributaries, 
IL and IN 1968 Nov. 17, 1986 53,136 
TABLE 30-H RECONNAISSANCE AND CONDITION SURVEYS 
(See Section 8 of Text) 
Date 
Reconnaissance 
or Condition 
Survey 
Project Conducted Cost 
Burns Waterway Harbor, IN Dec. 1986, Jan.-Feb. 1987 $15,293 
Burns Harbor, IN June-July 1987 6,856 
Indiana Harbor, IN Jan. 1987 148 
Michigan City Harbor, IN Mar. 1987 2,804 
Beverly Shores, IN Nov.-Dec. 1986, Jan. 1987 6,258 
30-18

DETROIT, MI DISTRICT * 
The district is composed of the upper and lower peninsulas of 
Michigan and portions of Indiana, Wisconsin and Minnesota, 
which border the lakes. It includes U.S. waters of Lakes Superior, 
Michigan, Huron, St. Clair and western Lake Erie. Unless otherwise 
indicated, all depths stated in this report are referred to 
low water datum as follows: Lake Superior, 600 feet; Lake 
Michigan-Huron, 576.8 feet; Lake Erie, 568.6 feet; and Lake 
St. Clair, 571.7 feet. Elevations in feet are above mean water 
level at Father Point, Quebec (International Great Lakes 
Datum-1955). 
IMPROVEMENTS 
Navigation Page 
1. Alpena Harbor, MI ............................ 31-2 
2. Arcadia Harbor, MI...........................31-2 
3. Ashland Harbor WI...........................31-2 
4. Big Bay Harbor, MI.........................31-3 
5. Black River, (U.P.) MI ...................... 31-3 
6. Bolles Harbor, MI................. ........... 31-3 
7. Caseville Harbor, MI..........................31-3 
8. Charlevoix Harbor, MI........................31-4 
9. Cheboygan Harbor, MI ........................ 31-4 
10. Clinton River, MI............................31-4 
11. Detour Harbor, MI................. ........... 31-5 
12. Detroit River, MI........................ ..... 31-5 
13. Duluth-Superior Harbor, MN and WI............ 31-5 
14. Forestville Harbor, MI.....................31-6 
15. Fox River, WI.................... ........... 31-6 
16. Frankfort Harbor, MI ......................... 31-7 
17. Grand Haven Harbor and Grand River, MI.......31-7 
18. Grand Marais Harbor, MI ..................... 31-8 
19. Grand Marais Harbor, MN .................... 31-8 
20. Grand Traverse Bay Harbor, MI................ 31-8 
21. Green Bay Harbor, WI ........................ 31-9 
22. Hammond Bay Harbor, MI ..................... 31-9 
23. Harbor Beach Harbor, MI......................31-9 
24. Harrisville Harbor, MI ........................ 31-10 
25. Holland Harbor, MI .......................... 31-10 
26. The Inland Route, MI ....................... 31-10 
27. Kenosha Harbor, WI ..................... 31-11 
28. Kewaunee Harbor, WI ....................... 31-11 
29. Keweenaw Waterway, MI .................... 31-11 
30. Lake St. Clair, MI Channels...................31-12 
31. Leland Harbor, MI.......................31-12 
32. Lexington Harbor, MI .................. ...... 31-12 
33. Little Lake Harbor, MI ...................... 31-13 
34. Ludington Harbor, MI ....................... 31-13 
Navigation (cont.) Page 
35. Mackinac Island Harbor, MI ................... 31-13 
36. Manistee Harbor, MI ......................... 31-14 
37. Manitowoc Harbor, WI ....................... 31-14 
38. Marquette Harbor, MI.......................31-15 
39. Menominee Harbor and River, MI and WI....... 31-15 
40. Milwaukee Harbor, WI ....................... 31-15 
41. Monroe Harbor, MI .......................... 31-16 
42. Muskegon Harbor, MI ....................... 31-17 
43. New Buffalo Harbor, MI ...................... 31-17 
44. Ontonagon Harbor, MI ....................... 31-17 
45. Pentwater Harbor, MI ........................ 31-17 
46. Point Lookout Harbor, (Au Gres River) MI ...... 31-18 
47 Portage Lake Harbor, MI ..................... 31-18 
48 Port Austin Harbor, MI ...................... 31-18 
49. Port Sanilac Harbor, MI ...................... 31-18 
50. Presque Isle Harbor, MI ...................... 31-19 
51. Rouge River, MI .......................... 31-19 
52. Saginaw River, MI..........................31-20 
53. St. Clair River, MI................ .......... 31-20 
54. St. Joseph Harbor, MI...................... 31-20 
55. St. Marys River, MI.........................31-21 
56. Saugatuck Harbor and Kalamazoo River, MI..... 31-22 
57. Saxon Harbor, WI................ ........... 31-22 
58. Sebewaing River, MI ........................ 31-23 
59. Sheboygan Harbor, WI ....................... 31-23 
60. South Haven Harbor, Mi......................31-23 
61. Sturgeon Bay and 
Lake Michigan Ship Canal, WI.................31-24 
62. Two Harbors, MN...........................31-24 
63. Two Rivers Harbor, WI ...................... 31-24 
64. White Lake Harbor, MI.......................31-24 
65. Reconnaissance and Condition Surveys..........31-25 
66. Other Authorized Navigation Projects........... 31-25 
67. Navigation Work Under Special Authorization. .. 31-25 
31-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Beach Erosion Control Page 
68. Authorized Beach Erosion Control Projects...... .31-25 
69. Emergency Shore Protection................... 31-25 
70. Beach Erosion Work Under Special 
Authorization................................31-26 
71. Mitigation of Shore Damages .................. 31-26 
Flood Control 
72. Kawkawlin River, MI....................... 31-26 
73. Paw Paw Lake, MI........................ 31-26 
74. Red Run Drain & Lower Clinton River, MI ...... 31-27 
75. Saginaw River, MI. ........................ 31-27 
76. Sebewaing, Sebewaing River, MI............... 31-28 
77. Inspection of Completed Flood Control Projects...31-28 
78. Other Authorized Flood Control Projects......... 31-28 
79. Flood Control Under Special Authorization...... 31-28 
80. Surveillance of Northern Boundary Waters....... 31-29 
Navigation 
1. ALPENA HARBOR, MI 
Location. At mouth of Thunder Bay River which empties into 
Thunder Bay, Lake Huron. Harbor is 100 miles southeast of 
Cheboygan Harbor, MI. River has its source in Montmorency 
and Alpena Counties, MI. (See NOAA Nautical Chart 14864.) 
Previous project. For details see page 1957 of Annual Report 
for 1915 and page 1548 of Annual Report for 1938. 
Existing project. Provides for a bay channel 200 feet wide 
and 25 feet deep from deep water in Thunder Bay to a point 300 
feet lakeward of the Alpena Light; thence an entrance channel 
24 feet deep, narrowing to a width of 100 feet at a point 700 
feet upstream from the light; a river channel 100 feet wide, 23 
feet deep to Second Avenue Bridge; thence 18.5 feet deep and 
75 feet wide for 1,600 feet to upper limit of Federal project; a 
turning basin at upstream end of project, basin at river mouth 
19 feet deep, trapezoidal in shape, with a maximum width of 700 
feet including the channel width and a maximum length of 900 
feet along the channel line, including removal of existing rubble 
breakwater; and a breakwater about 550 feet long paralleling 
lakeward side of new turning basin. Work authorized by the 1965 
River and Harbor Act, which consists of the proposed turning 
basin and breakwater reconfiguration, was deauthorized by the 
Water Resources Development Act of 1986; Public Law 
99-662--Nov. 17, 1986, 99th Congress, Title X. 
2. ARCADIA HARBOR, MI 
Location. On east shore of Lake Michigan, 193 miles northeasterly 
from Chicago, IL, and 15 miles northerly from Manistee, 
MI. (See NOAA Nautical Chart No. 14907). 
Existing project. Provided for maintenance dredging of the 
existing harbor built by private interests for a period of five years. 
The five years covered by this project were the calendar years 
1905 to 1909, inclusive. Funds were also appropriated and 
maintenance was performed in calendar years 1911, 1912, 1913 
and 1915, inclusive. There is at present no approved project for 
the improvement of this harbor. (See Table 31-B for authorizing 
legislation.) 
Local cooperation. None required. 
Terminal facilities. Dock facilities are considered adequate 
for existing recreational traffic. 
General Investigations Page 
81. Surveys ................ ................. 31-30 
82. Preconstruction Engineering and Design.........31-31 
83. Collection and Study of Basic Data............. 31-31 
Tables 
Table 31-A Cost & Financial Statement............. 31-32 
Table 31-B Authorizing Legislation ................. 31-44 
Table 31-C Other Authorized Navigation Projects..... 31-56 
Table 31-D Not Applicable ............................ 
Table 31-E Other Authorized Flood Control Pr'ojects.. 31-57 
Table 31-F Multiple Purpose Projects, including Power 
(St. Marys River, MI: Existing Project) ... 31-57 
Table 31-G Deauthorized Projects .................. 31-58 
Table 31-H Features of Existing Project ............. 31-59 
Table 31-I Fox River, WI: Locks & Dams.......... 31-60 
Table 31-J Reconnaissance & Condition Surveys.. ... 31-61 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, miscellaneous inspections and 
reports were performed by Government forces at a cost of 
$48,844. A contract was awarded and completed for maintenance 
dredging at a cost of $52,215, removing approximately 11,572 
cubic yards of shoal material by hydraulic dredge. A rental contract 
was awarded and completed for emergency repairs to the 
north and south piers and revetments at a cost of $83,600. 
Government furnished supplies and materials were provided at 
a cost of $50,632. Repairs to navigation.structures were performed 
by hired labor using the Cranebarge MANITOWOC at a cost 
of $57,411. Engineering and design for repair to north and south 
piers and revetments was performed at a cost of $48,482. 
Engineering, design, surveys, real estate, supervision and administration 
cost $45,904. 
Existing project was completed in 1909. Varying depths of 5-12 
feet exist in the channel at present. Future maintenance of the 
harbor will be based on providing a 9-foot depth. Piers and 
revetments are in good condition with some sections in need of 
major repair. Total cost at the end of FY for existing project was 
$1,641,905. 
3. ASHLAND HARBOR, WI 
Location. At head of Chequamegon Bay, on south shore of 
Lake Superior, about 65 miles east of Duluth, MN. (See NOAA 
Nautical Chart 14974.) 
Existing project. A west channel 20 and 21 feet deep and an 
east basin 25 and 27 feet deep, both all protected by an 8,000-foot 
breakwater. For additional details see page 1008 of Annual Report 
for 1965. (See Table 31-B for authorizing legislation) 
Local cooperation. Fully complied with. 
Terminal facilities. City of Ashland owns 4,150 feet of waterfront 
for future public needs. Wharves for handling coal, ore, 
limestone, logs and pulpwood are served by railroads. Facilities 
are considered adequate for existing commerce. Handling of ore 
and logs has been discontinued for the present. 
Operations during fiscal year. Maintenance: Condition 
surveys were performed by Government forces at a cost of 
$14,652. Breakwater repairs were performed by hired labor using 
the Derrickbarge COLEMAN at a cost of $333,721. Supervision 
and administration were performed at a cost of $11,873. 
31-2

DETROIT, MI DISTRICT 
Work authorized prior to 1960 Act was completed in 1950. 
Work authorized by 1960 Act was completed in November 1962. 
Total cost of existing project to end of FY was $4,666,239, of 
which $1,695,645 was for new work and $2,970,594 for 
maintenance. 
4. BIG BAY HARBOR MI 
Location. On south shore of Lake Superior 33 miles northwesterly 
from Marquette, MI, and 38 miles easterly from Portage 
entry to Keweenaw Waterway. (See NOAA Nautical Chart 
14964.) 
Existing project. Provides for two converging piers extending 
from shore, an entrance channel between piers and rectangular 
harbor basin. Project depths are 12 feet in entrance channel and 
10 feet in harbor basin. For details see page 1009 of Annual 
Report for 1965 and page 1261 of Annual Report for 1962. (See 
Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Operations during fiscal year. Maintenance: Condition 
surveys were performed by Government forces at a cost of 
$11,952. A dredging contract was awarded and completed this 
FY at a cost of $99,241, removing approximately 17,300 cubic 
yards of dredged material. Engineering, design, surveys, supervision 
and administration cost $30,689. 
Project was completed in June 1961 except for protection at 
inner end of east breakwater, completed in November 1961. A 
contract for repair of breakwater, damaged by storms, was completed 
in August 1969. Total cost to end of FY was $1,555,742, 
of which $390,432 was for new work and $1,165,310 for 
maintenance. 
5. BLACK RIVER HARBOR 
(UPPER PENINSULA), MI 
Location. At mouth of Black River on south shore of Lake 
Superior 39 miles westerly from Ontonagon, MI, and 47 miles 
easterly from Ashland, WI. (See NOAA Nautical Chart 14965.) 
Existing project. Two converging breakwaters, an entrance 
channel between breakwaters, an inner channel, and an irregular 
harbor basin. For additional details see page 1092 of Annual 
Report for 1966. Project depths are 12 feet in the approach channel 
and 8 feet in the river channel and basin. (See Table 31-B 
for authorizing legislation.) 
Local cooperation. Fully complied with. Local interests furnished 
easements on 0.85 acre of land. 
Terminal facilities. Wharves constructed on both sides of river. 
Wharf on east bank has frontage of 400 feet; on west bank, a 
frontage of 750 feet. 
Operations during fiscal year. Maintenance: Miscellaneous 
inspections and reports were performed by Government forces 
at a cost of $1,410. 
Project was completed in June 1958. A triangular-shaped rock 
shoal 50 feet wide at easterly end extends along southerly side 
of channel. Total cost of existing project to end of FY was 
$961,773, of which $383,350 was for new work and $578,423 
for maintenance. 
6. BOLLES HARBOR, MI 
Location. On west shore of Lake Erie at mouth of La Plaisance 
Creek, 7 miles southwest of Monroe, MI. (See NOAA Nautical 
Chart 14846.) 
Existing project. Provides for an entrance channel in Lake 
Erie, 8 feet deep and 80 feet wide from deep water to a point 
opposite the outer end of existing jetty, thence widening to 100 
feet at creek mouth; an access channel in La Plaisance Creek, 
6 feet deep and 100 feet wide at the mouth widening to 120 feet 
and extending to the first bend, thence narrowing to 50 feet wide 
and continuing at that width to the La Plaisance Road bridge; 
a steel sheet pile revetment, about 200 feet long, located along 
Michigan State Conservation Department property on west side 
of channel at creek mouth. Project also provides for inclusion 
of existing 400-foot long steel sheet pile jetty constructed by 
Michigan State Waterways Commission at the mouth of La 
Plaisance Creek. (See Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. The Monroe Boat Club and three marinas 
provide facilities adequate for existing recreational boat traffic. 
There is also a public launching ramp and parking area at Conservation 
Department fishing site at creek mouth. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, miscellaneous inspections and 
reports were performed by hired labor at a cost of $33,976. Minor 
repairs to the diked disposal area were performed by hired labor 
at a cost of $300. The contract for repair of Dike Disposal Facility 
awarded last FY was completed at a cost of $69,857. Engineering 
and design during construction cost $1,537. Engineering and 
design for dredging was completed at a cost of $20,686. A contract 
for maintenance dredging was awarded this FY in the amount 
of $316,972. No work was performed this FY. Supervision and 
administration cost $17,546. 
The existing project was completed in 1970 (Adequate depths 
exist over the project length except for the upstream 800 feet). 
Total costs to the end of FY were $2,809,387, of which $426,413 
was for new work ($255,000 contributed funds) and $2,382,974 
for maintenance. 
7. CASEVILLE HARBOR, MI. 
Location. At mouth of Pigeon River on south shore of Saginaw 
Bay about 17 miles southwest of Port Austin, MI. (See NOAA 
Nautical Chart 14860.) 
Existing project. A small craft harbor of refuge consisting of 
a breakwater protected channel extending from the 10-foot contour 
in Saginaw Bay into Pigeon River. Project depths are 10 
and 8 feet. For additional details see page 1320 of Annual Report 
for 1963. Widening river channel from 50 to 60 feet for about 
1,000 feet, with widening to 80 feet in upper 300-foot reach, is 
considered inactive. Estimated (1963) cost of this portion of project 
is $30,000. (See Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Complete public boating facilities constructed 
by State and local agencies are available in addition to 
privately owned and operated marinas. 
31-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Operations during fiscal year. Maintenance: Condition 
surveys were performed by Government forces at a cost of 
$17,898. A contract for maintenance dredging was awarded and 
completed at a cost of $195,799, removing approximately 27,828 
cubic yards of shoal material. Engineering, design, surveys, 
supervision and administration cost $43,409. 
The existing project was completed in 1964 except for the inactive 
portion of the project. Total costs to end of FY were 
$1,683,614 of which $587,314 was for new work (including 
$293,657 contributed funds) and $1,096,300 for maintenance. 
8. CHARLEVOIX HARBOR, MI 
Location. On east shore of Lake Michigan, 276 miles northeasterly 
from Chicago, IL, and 75 miles northerly from Frankfort, 
MI. (See NOAA Nautical Chart 14942.) 
Existing project. A channel 24 feet deep in Lake Michigan 
and a river channel 23 feet deep in the lower and upper channels 
connecting Lake Michigan with Lake Charlevoix via Round Lake. 
The channels are protected where needed by piers and revetments. 
For additional details see page 1476 of Annual Report for 1962. 
(See Table 31-B for authorizing legislation.) 
Local cooperation. None required except the latest project 
modification is subject to the following: Provide without cost to 
the United States, all lands, easements, and rights-of-way required 
for construction and subsequent maintenance of the modified 
project upon the request of the Chief of Engineers, including 
suitable areas determined by the Chief of Engineers to be required 
in the general public interest for initial and subsequent disposal 
of excavated materials and any necessary retaining dikes, 
bulkheads, and embankments, therefor, or the cost of such retaining 
works; hold and save the United States free from damages 
due to the construction and maintenance of the modified project, 
except for damages due to the fault or negligence of the United 
States or its contractors; provide and maintain without cost to 
the United States depths in berthing areas and local access channels 
serving the terminals commensurate with the depths provided 
in the related project areas; accomplish, without cost to the United 
States, such alterations of submarine utility crossing as are required 
by the modified project; establish regulations prohibiting 
discharge of pollutants into the waters of the harbor by users 
thereof which regulations shall be in accordance with applicable 
laws or regulations of Federal, State and local authorities responsible 
for pollution prevention and control; if acquiring lands, 
easements and rights-of-way for construction of the project, local 
interests will comply with the applicable provisions of the 
Uniform Relocation Assistance and Real Property Acquisition 
Policies Act of 1970; Public Law 91-646, approved January 2, 
1971; contribute all costs in excess of $1,000,000 should the total 
cost of construction of the general navigation facilities exceed 
that amount, in accordance with provisions of Section 107 of the 
1960 River and Harbor Act, as amended. The total first cost of 
construction (1975) is estimated at $652,000. 
Terminal facilities. Several small landing places in Round 
Lake at Charlevoix for handling fish and miscellaneous commodities, 
a wharf for petroleum products at west end of Lake 
Charlevoix, and coal wharves at Advance and Boyne City. Charlevoix, 
Boyne City, and East Jordan provide public docks 
for small craft. Facilities considered adequate for existing 
commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, miscellaneous inspections and 
reports were performed at a cost of $69,111. Minor repairs to 
navigation structures were performed this FY by hired labor at 
a cost of $502. A contact was awarded for South Revetment 
repairs, Sections G & H, in the amount of $214,588. No work 
was performed this FY. Engineering and design for repair of 
South Pier and Revetment Sections A, F, G & H was performed 
at a cost of $167,120. Real estate and supervision cost $14,661. 
Existing project was completed in 1939 except for the latest 
modification. A controlling depth of 18 feet is available 
throughout the entire project, except for minor shoaling along 
the channel limits. Total costs to end of FY were $7,705,049 
of which $180,623 was for new work, $6,395,030 for 
maintenance (Bank Stabilization $46,352) and $1,129,396 for 
rehabilitation. 
9. CHEBOYGAN HARBOR, MI 
Location. At mouth of Cheboygan River which empties into 
Western Lake Huron about 16 miles southeast of the Straits of 
Mackinac Bridge. (See NOAA Nautical Charts 14881 and 14886.) 
Previous project. For details see page 1956 of Annual Report 
for 1915, and page 1546 of Annual Report for 1938. 
Existing project. A channel 21 feet deep and 200 feet wide 
from 21-foot contour in Lake Huron to outer end of west pier; 
thence, between lines parallel to and 25 feet from the docks, 21 
feet deep from this point to East First Street and thence 18.5 feet 
deep and 60 feet wide from this bridge to the lock in Cheboygan 
River; a turning basin 21 feet deep, 400 feet wide, and 420 to 
770 feet long on east side of existing project channel just below 
East First Street; and rubblemound breakwater about 775 feet 
long on the site of existing west pier at mouth of river. Project 
is 12,000 feet long, of which about 6,000 feet are in Straits of 
Mackinac. (See Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Several privately owned wharves used for 
receiving coal, stone and petroleum products. Public recreational 
boating facilities constructed by the State and local agencies are 
available. These facilities satisfy existing commerce and vessel 
traffic. 
Operations during fiscal year. Maintenance: Condition 
surveys and miscellaneous inspections and reports were performed 
by hired labor at a cost of $11,099. 
Total costs to end of FY were $1,375,576 of which $504,236 
was for new work and $871,340 for maintenance. 
10. CLINTON RIVER, MI 
Location. Has its source in Oakland County, MI, flows easterly 
about 60 miles and empties into Anchor Bay in northwestern part 
of Lake St. Clair. (See NOAA Nautical Chart 14850.) 
Previous project. For details see page 1958 of Annual Report 
for 1915, and page 1556 of Annual Report for 1938. 
Existing project. An entrance channel in Anchor Bay 8 feet 
deep, 300 feet wide at 8-foot depth contour in the bay, gradually 
decreasing to 50 feet wide at about 1,000 feet upstream from 
mouth of Clinton River, a length of about 4,600 feet; a channel 
8 feet deep and 50 feet wide in the river about 38,700 feet long 
from entrance channel upstream to Mt. Clemens at Cass Avenue; 
closing old channel and making a cutoff at Shoemakers Bend; 
closing Catfish Channel; construction of revetments as needed 
in the river; and a harbor basin, 5 feet deep and 11 acres in area 
31-4

DETROIT, MI DISTRICT 
at entrance along bay channel, protected by breakwaters on north 
and south sides. (See Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. River is used exclusively by recreational 
craft. There are numerous public and private piers and wharves 
along the river below the city. They are considered adequate. 
Operations during fiscal year. Maintenance: Condition 
surveys, miscellaneous inspections and reports were performed 
by Government forces at a cost of $79,661. Maintenance of 
disposal area was performed by the Derrickbarge HURON at a 
cost of $10,000. Engineering and design for construction of a 
confined disposal facility was completed at a cost of $220,633. 
A contract for construction of a confined disposal facility was 
awarded in the amount of $1,495,000. No work was performed 
this FY. Surveys and layouts, supervision and administration cost 
$16,489. 
Existing project was completed in 1966. Total costs to end of 
FY were $2,354,741, of which $549,798 (including $289,752 
contributed funds) was for new work, and $1,804,943 for 
maintenance. 
11. DETOUR HARBOR, MI 
Location. On the west side of DeTour Passage, about 2 miles 
upstream from Lake Huron. The passage forms the mouth of the 
St. Marys River which connects Lakes Huron and Superior. (See 
NOAA Nautical Chart 14882.) 
Existing project. Provides for small boat harbor and harbor 
of refuge by dredging a 10-foot deep entrance channel and providing 
an 8-foot deep access channel protected by a 1,305-foot 
breakwater. The total estimated (October 1981) project cost is 
$2,650,000; the Federal cost is $1,400,000 and the non-Federal 
cost is $1,250,000, which is a cash contribution. (See Table 31-B 
for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Public docking, landing, parking and 
sanitary facilities are being provided by the State of Michigan. 
Operations during fiscal year. Maintenance: Condition 
surveys were performed by Government forces at a cost of 
$2,320. Engineering and design began this FY for breakwater 
repairs at a cost of $10,011. 
Existing project is complete. Total cost to end of FY is 
$2,581,453, of which $22,107 was for maintenance and 
$2,559,346 for new work. 
12. DETROIT RIVER, MI 
Location. One of the Great Lakes connecting channels, 31 
miles long, flows south from Lake St. Clair to Lake Erie. (See 
NOAA Nautical Chart 14848.) 
Previous project. For details see page 1958 of Annual Report 
for 1915, and page 1541 of Annual Report for 1938. 
Existing project. Improving Detroit River main channels to 
provide 25.5-foot draft navigation; improving certain auxiliary 
and side channels; and construction of various water level and 
crosscurrent control structures. Details are in accompanying Table 
31-H. Project depths are referred to local low water datum planes 
which correspond to low water datums for Lakes St. Clair and 
Erie, 571.7 and 568.6 feet above mean water level at Father Point, 
Quebec (International Great Lakes Datum--1955.) (See Table 
31-B for authorizing legislation.) 
Estimated 1978 Federal cost of new work, exclusive of amounts 
expended on previous projects, is $159,300,000. 
Local cooperation. Fully complied with. No local cooperation 
is required for modifications authorized by Acts of July 1946 
and March 1956. The Trenton Channel modification approved 
August 13, 1968, is considered inactive. 
Terminal facilities. Numerous commercial installations used 
for handling coal, iron ore, limestone, steel products, petroleum 
products, and other items such as overseas general cargo. Detail 
on actual port and harbor facilities is in Port Series No. 45 (revised 
1984) prepared and published by the Water Resources Support 
Center. Facilities are considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, Hi-Fix surveys, support of water control center, environmental 
studies, master plan, miscellaneous inspections and 
reports were performed by Government forces at a cost of 
$1,124,399. Studies continued under extended navigation season 
at a cost of $81,038. Maintenance of disposal areas by hired labor 
cost $140,344. Location and removal of obstructions cost 
$1,507,016. A contract for dredging East Outer and Lower Livingstone 
Channels awarded last FY was completed at a cost of 
$568,016, removing 65,000 cubic yards of material. A contract 
for repair of diked disposal facility, Pte. Mouillee, was awarded 
this FY and is approximately 94% complete at a cost of $468,596. 
Engineering and design for repair to disposal area cost $7,731. 
Other engineering, design, surveys, supervision and administration 
cost $80,555. The contract awarded last FY for construction 
of Wetland Marsh under Section 150 of the Water Resources 
Development Act of 1967 was completed at a cost of $88,562. 
Engineering during construction, surveys, supervision and administration 
for this contract cost $53,928. The State of Michigan 
contributed $89,344 of the above Section 150 cost. Work under 
the diked disposal program cost $54. 
Latest modification of connecting channels project in the Detroit 
River is complete except for compensating works. All work in 
Trenton Channel is complete. Pertinent data concerning channels 
covered by project at end of FY are set forth in Table 31-H. 
Costs for existing project were $193,021,801, of which 
$74,780,103 was for new work ($72,969,197 regular funds and 
$1,530,688 Public Works Funds) and $118,241,698 ($292,344 
Section 150 contributed funds) for maintenance. 
13. DULUTH-SUPERIOR HARBOR, 
MN AND WI 
Location. At extreme western end of Lake Superior. Cities 
of Duluth, MN, and Superior, WI, are on north and south sides, 
respectively. (See NOAA Nautical Chart 14975.) 
Previous projects. See page 1246 of Annual Report for 1962. 
Existing project. Provides for rebuilding canal piers at Duluth 
entry, replacement or construction of piers and breakwater at 
Superior entry and dredging approaches and channels within harbor, 
St. Louis Bay, and St. Louis River. Channels vary in depth 
from 32 to 28 feet in entrances, are 27 feet deep in iron-ore route 
channels, and are from 20 to 23 feet in inner channels. (See Table 
31-B for authorizing legislation.) 
For details of authorized channel dimensions and dimensions 
of structures, see pages 1246 and 1247 of Annual Report for 1962 
and page 1011 of Annual Report for 1965. Portion of project for 
deepening Twenty-first Avenue West channel is inactive. 
Estimated cost (1967) of this portion was $577,000. 
31-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
The Water Resources Development Act (W.R.D.A.) of 1986 
authorized modifications to the project to deepen the western portions 
of North and South Channels, the entire Upper Channel, 
and the Minnesota Channel to 27 feet LWD; widen the Cross 
Channel to provide a minimum turning basin of 1,500 feet; widen 
the bend at the Arrowhead Bascule Bridge to 600 feet; and construct 
an upland confined disposal facility. Estimated cost (Oct. 
86) is $12,600,000; which includes $6,756,000 Federal and 
$5,844,000 non-Federal. 
Local cooperation. Fully complied with for completed portion 
of project. Local cooperation items for the newly authorized 
project in the W.R.D.A. of 1986 (P.L. 99-662), are as described 
in House Document 150, 86th Congress, 1st Session, and also 
includes, as a result of P.L. 99-662, construction cost sharing 
as follows: 
a. Contribute in cash 25 percent of the total cost of construction 
of general navigation facilities, exclusive of aids to navigation, 
a contribution presently estimated at $2,259,000. The 
estimated cash contribution of $2,259,000 to be paid in lump sum 
prior to initiation of construction, or in annual installments during 
the construction period at a rate proportionate to the proposed 
or scheduled expenditure of Federal funds as required by the 
Chief of Engineers, or under another arrangement satisfactory 
to the Secretary of the Army, the final apportionment of cost to 
be made after actual costs have been determined; and 
b. Repay, with interest, over a period of up to 30 years following 
project completion, 10 percent of the total cost of construction 
of general navigation facilities, an amount presently estimated 
at $902,000. The Secretary of the Army may count against all 
or part of the 10 percent repayment, the amount of the local contribution 
for lands, easements, rights-of-way, dredged/demolition 
material disposal sites and relocations. In no case are these 
costs to count against the cash payment during construction, and 
in no case would the amount waived exceed 10 percent of project 
cost. 
Terminal facilities. There are 113 docks or terminals including 
some 54 major ones; all but one are privately owned. Facilities 
for handling iron ore, coal, limestone, petroleum, steel and scrap 
iron, cement, general cargo, and grain are believed adequate for 
most existing commerce. 
Operations during fiscal year. Rehabilitation: The contract 
awarded in FY 85 for rehabilitation of North and South Piers 
Sections O, N-1, N and M is approximately 99% complete at 
a cost this FY of $3,722,670. Engineering and design, real estate, 
supervision and inspection cost $207,497. Maintenance: Condition 
surveys, environmental studies, support of water control 
center, master plan, miscellaneous inspections and reports were 
performed by Government forces at a cost of $307,239. Operation 
and maintenance of the museum was performed by Government 
forces at a cost of $325,702. Operation and maintenance 
of service facilities and pier was performed at a cost of $133,617. 
Repairs to breakwater and seawalls were performed by the Derrickbarge 
COLEMAN at a cost of $312,976. Safety maintenance 
was performedby hired labor at a cost of $15,974. Maintenance 
of disposal area was performed by hired labor at a cost of 
$38,810. An adjustment of $11,110 and 23,503 cubic yards was 
made to a maintenance dredging contract awarded in FY 85 and 
completed last FY. The contract for maintenance dredging awarded 
last FY was completed with 130,824 cubic yards removed this 
FY at a cost of $799,999. A contract for maintenance dredging 
of contaminated materials was awarded this FY in the amount 
of $1,390,368. The contract is approximately 10% complete with 
19,899 cubic yards of material removed at a cost of $177,999. 
Engineering, design, surveys, supervision and administration 
were performed at a cost of $180,858. 
Work authorized prior to 1960 Act was completed in June 1956. 
Under the 1960 Act, work on the outer harbor, included in House 
Document 150, was completed in June 1965. Work in the inner 
harbor, included in House Document 196, started in May 1963, 
was completed in November 1968 except for 21st Avenue West 
channel portion which is inactive. 
The United States owns 34.90 acres of land in fee in Minnesota 
and Wisconsin of which 2.15 acres are used for a vessel yard. 
Total cost of existing project to end of FY was $66,211,055, of 
which $16,109,258 was for new work, $39,106,172 for 
maintenance, and $10,995,625 for rehabilitation. 
14. FORESTVILLE HARBOR, MI 
Location. On southeasterly shore of Lake Huron, in Sanilac 
County, about 47 miles northerly from the head of St. Clair River 
at Port Huron. (See NOAA Nautical Chart 14862.) 
Existing project. Provides for two breakwaters having an aggregate 
length of 2,240 feet with provisions for recreational 
fishing on the main breakwater; an anchorage and maneuver area 
of about six acres and eight feet deep; and a flared entrance channel 
ten feet deep decreasing in width to 160 feet through the 
breakwaters. Existing project was authorized by August 13, 1968 
River and Harbor Act (H. Doc. 183, 90th Congress, 1st Session, 
contains latest published map). 
This project was never funded and was subsequently 
deauthorized by the Water Resources Development Act of 1986; 
Public Law 99-662-Nov. 17, 1986, 99th Congress, Title X (See 
Table 31-G for list of deauthorized projects). 
15. FOX RIVER, WI 
Location. Rises in Columbia County, WI, and flows about 176 
miles northerly into Green Bay. Wolf River, physically a main 
river but by designation a tributary of Fox River, rises in central 
part of Fort County, WI, and flows southerly. (See NOAA 
Nautical Chart 14916 for Lake Winnebago and lower Fox River.) 
Previous projects. See page 1368 of Annual Report for 1962. 
Existing project. Deepening and widening channel of Fox 
River from DePere 7 miles above mouth to confluence of Wolf 
River, a total length of 59 miles, to 6 feet, with 9.6 feet in rock 
cut below DePere lock and 7 feet in other rock cuts on lower 
river below Menasha lock; construction and reconstruction of 19 
locks and 9 dams; a concrete retaining wall at Kaukauna; construction 
and maintenance of harbors having depths of 6 feet on 
Lake Winnebago; widening Neenah Channel to 100 feet, with 
a 6-foot depth for about 1 mile; and dredging, snagging, and 
othewise improving Wolf River 47 miles from its mouth to New 
London, depth to be 4 feet. 
Cost of completed portion of project is $513,424 for the lower 
river exclusive of previous projects. River and Harbor Act of 
1925 portion of project is considered inactive and excluded from 
cost estimate. Estimated cost (1924) of this portion is $2,886,000. 
(See Table 31-B for authorizing legislation.) 
Local cooperation. None required. 
31-6

DETROIT, MI DISTRICT 
Terminal facilities. Wharf and landing facilities are, in general, 
adequate for existing needs. (See Table 31-I on locks and dams, 
Fox River, WI.) 
Operations during fiscal year. Maintenance: Condition 
surveys, boundary monumentation, miscellaneous inspections and 
reports, safety training and plans for flood emergencies were performed 
at a cost of $53,083. Federal canal banks at various locations 
were repaired at a cost of $129,752. The operation and 
maintenance of nine (9) dams and ten (10) overflow weirs and 
caretaker status maintenance of seventeen (17) locks and two (2) 
guard locks totaled $693,228. Two tainter gates and seals were 
reconditioned at Menasha Dam at a cost of $13,391. Fox River 
O.S.H.A. Program and major miscellaneous items of supply totaled 
$9,063. Water control studies, monitoring and regulation of 
water levels were performed at a cost of $222,176. Engineering 
and design costs were $18,786. Supervision and administration 
costs were $111,954. 
Existing project is complete except for the inactive portion. 
Nineteen original locks and nine original dams have been rebuilt. 
(See Table 31-I for year of completion of each). Structures and 
dredging in pools have increased original depths generally about 
2 feet. Work remaining to complete project consists of dredging 
in upper portion of Wolf River, and rock removal and deepening 
of Neenah Channel on lower Fox River, which are no longer 
considered necessary. Existing locks and dams are generally in 
fair to good condition. Costs for existing project to end of FY 
were $3,753,334 for new work and $38,106,494 for operation 
and maintenance; a total of $41,859,828. Funds in the amount 
of $3,706,187 were expended between July 5, 1884, and June 
30, 1935, on operation and care of works of improvement under 
provisions of permanent indefinite appropriation for such 
purposes. 
16. FRANKFORT HARBOR, MI 
Location. On east shore of Lake Michigan, 204 miles northeasterly 
from Chicago, IL, and 28 miles northerly from Manistee, 
MI. (See NOAA Nautical Chart 14907). 
Existing project. Provides for constructing an exterior basin 
in Lake Michigan formed by two breakwaters, 450 feet apart at 
the outer ends, diverging at an angle of about 90 degrees, the 
main arm and shore connection on north breakwater are 972 and 
1,000 feet long, respectively, and the main arm and shore connection 
of south breakwater 1,188 and 1,400 feet long, respectively; 
for removing 801 feet of north and 1,172 feet of south 
pier; dredging basin 20 feet deep and 800 feet wide at entrance, 
decreasing toward new pier heads to 600 feet wide, dredging approach 
and entrance channel through outer basin to a depth of 
24 feet from deep water in Lake Michigan to a point 500 feet 
landward of opening between breakwaters, over the entire width 
outside the breakwaters and to a maximum width of 500 feet inside 
the breakwaters; thence to 23 feet deep through inner portion 
of outerbasin to outer end of north pier, over widths decreasing 
from 500 to 160 feet; and thence to 22 feet deep between 
the piers to the inner basin in Lake Betsie; dredging an 18-foot 
deep interior basin in Lake Betsie from within 50 feet of existing 
structures on the west and extending eastward about 1,550 feet 
to easterly boundary and from within 50 feet of existing structures 
on the north and extending southward 800 feet to the southerly 
boundary; dredging a recreational craft anchorage area 10 feet 
deep and 300 feet wide, extending 600 feet eastward of the east 
limit of the interior basin, with its north side in line with the north 
limit of the basin. Breakwaters and shore connections are built 
of concrete caissons and piling capped with concrete. Inner piers 
and revetments are built of stonefilled timber cribs and piling, 
all capped with concrete, except for 476 feet of south revetment 
which consists of steel sheet piling. (See Table 31-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Two car ferry slips on south shore and 
several docks along north shore of Lake Betsie. The City and 
State provide a recreational docking facility on north side of Lake 
Betsie which is open to all on equal terms. There is also a marine 
railway capable of handling small craft. Facilities are considered 
adequate for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, miscellaneous inspections and reports were performed 
by Government forces at a cost of $34,018. Repairs to navigation 
structures were performed by hired labor using the 
Cranebarge MANITOWOC at a cost of $108,599. Repairs to 
safety features were performed at a cost of $1,094. Supervision 
and administration cost $7,012. 
Existing project was completed in 1939, with exception of the 
latest modification which was completed in 1969. Navigation 
structures are in good condition and programmed for major repair 
on an as needed basis. For additional details on completion of 
existing project see page 1474 of Annual Report for 1962. Total 
costs for existing project to end of FY were $9,861,174, of which 
$1,955,159 (including $31,709 contributed funds) was for new 
work, $7,631,239 for maintenance, and $274,776 for 
rehabilitation. 
17. GRAND HAVEN HARBOR AND 
GRAND RIVER, MI 
Location. Harbor is on east shore of Lake Michigan. 108 miles 
northeasterly from Chicago, IL, and 23 miles northerly from 
Holland, MI. River rises in Jackson County, MI, and flows 260 
miles westerly into Lake Michigan. (See NOAA Nautical Chart 
14933, and Geological Survey Grand Rapids quadrangle.) 
Previous project. For details see page 1949 of Annual Report 
for 1915, and page 1481 of Annual Report for 1938. 
Existing project. An entrance channel protected by parallel 
piers and revetments at mouth of Grand River, a deep draft channel 
in river extending to Spring Lake, a turning basin, and a 
shallow draft channel in river extending 14.5 miles upstream to 
Bass River. Project depths are 23 feet in entrance channel, 21 
feet in river to turning basin, 18 feet in turning basin and channel 
to Spring Lake, and 8 feet in upper Grand River channel. 
For additional details see page 1461 of Annual Report for 1962. 
Dredging on northerly side of inner channel is considered inactive. 
Estimated cost of this portion (1954) is $38,600. The Water 
Resources Development Act (W.R.D.A.) of 1986 authorized 
modifications to deepen the harbor entrance and river channels 
to 29 and 27 feet, respectively; and provides for a new and larger 
turning basin. Estimated cost (Oct. 86) is $17,800,000; which 
includes $10,400,000 Federal and $7,400,000 non-Federal. (See 
Table 31-B for authorizing legistlation.) 
Local cooperation. Fully complied with for completed portions 
of project. Local cooperation items for the newly authorized 
project in the W.R.D.A. of 1986 (P.L. 99-662), are as described 
in House Document 661, 76th Congress, 3d Session, and also 
includes, as a result of P.L. 99-662, construction cost sharing 
requirements as follows: 
31-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
a. Contribute in cash 25 percent of the total cost of construction 
of general navigation facilities, exclusive of aids to navigation, 
a contribution presently estimated at $3,460,000. The 
estimated cash contribution of $3,460,000 to be paid in lump sum, 
prior to initiation of construction, or in annual installments during 
the construction period at a rate proportionate to the proposed 
or scheduled expenditure of Federal funds as required by the 
Chief of Engineers, or under another arrangement satisfactory 
to the Secretary of the Army, the final apportionment of cost to 
be made after actual costs have been determined; and 
b. Repay, with interest, over a period of up to 30 years following 
project completion, 10 percent of the total cost of construction 
of general navigation facilities, an amount presently estimated 
at $1,386,000. The Secretary of the Army may count against all 
or part of the 10 percent repayment, the amount of the local contribution 
of lands, easements, rights-of-way, dredged/demolition 
material disposal sites and relocations. In no case are these costs 
to count against the cash payment during construction, and in 
no case would the amount waived exceed 10 percent of project 
cost. 
Terminal facilities. Several wharves exist for handling coal, 
limestone, sand and gravel, petroleum products, fish and 
miscellaneous commodities. There is also a car ferry slip which 
is inactive. The State and local agencies provide recreational 
boating facilities which are open to all on equal terms. Facilities 
are considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, miscellaneous inspections and 
reports were performed by Government forces at a cost of 
$144,381. The U.S. Cranebarge MANITOWOC performed 
repairs to the N. Revetment Section F; N. Pier Sections A, A-2, 
and B; S. Pier Sections H, and H-l; and S. Revetment Sections 
L, S, and T, at a cost of $153,563. Repairs to safety features 
were performed at a cost of $4,000. Maintenance of the confined 
disposal facility was performed by hired labor at a cost of 
$3,172. A contract was awarded and completed this FY for 
maintenance dredging at a cost of $160,733, removing approximately 
22,400 cubic yards of shoal material from the outer harbors. 
This contract was also for beach nourishment. A contract 
was awarded and completed this FY to remove platform and trestle 
in the diposal area in the amount of $40,485. Another contract 
was awarded and completed to cap off part of the confined 
disposal facility in the amount of $75,085. Engineering, design, 
surveys, real estate, supervision and administration cost $88,636. 
Condition surveys, environmental studies, miscellaneous inspections 
and reports in connection with Section 111 of P.L. 90-483 
were performed at a cost of $36,036. Beach nourishment in conjunction 
with above maintenance dredging contract cost $45,354. 
Engineering, design, supervision and administration cost for Section 
111 was $11,218. 
Existing project was substantially completed in 1949. For additional 
details on completion of existing project see page 1463 
of Annual Report for 1982. Structures are generally in good condition; 
repairs are made on an as needed basis. Total costs of 
existing project to end of FY were $25,942,459, of which 
$1,458,469 was for new work, $23,670,377 for maintenace, and 
$813,613 for rehabilitation. 
18. GRAND MARAIS HARBOR, MI 
Location. On south shore of Lake Superior, 93 miles west of 
Sault Ste. Marie, MI. (See NOAA Nautical Chart 14962.) 
Existing project. Provides for a channel protected by parallel 
piers and for closing natural entrance channel with a pile dike. 
Project depths are 18 feet between piers and 20 feet in lake approach. 
For additional details see page 1449 of Annual Report 
for 1962. (See Table 31-B for authorizing legislation). 
The uncompleted portion of the project, which consists of 
widening the inner portion of the channel from 250 to 300 feet, 
was deauthorized by the Water Resources Development Act of 
1986; Public Law 99-662--Nov. 17, 1986, 99th Congress, Title X. 
19. GRAND MARAIS HARBOR, MN 
Location. On north shore of Lake Superior, 106 miles northeasterly 
from Duluth, MN. (See NOAA Nautical Chart 14967.) 
Existing project. Provides breakwater piers to narrow the entrance; 
concrete seawalls across ledge at southeast corner of harbor; 
an anchorage area and a small-boat basin protected by a rubblemound 
breakwater. Project depths are 16 feet in anchorage 
area increasing to 20 feet near entrance and 8 feet in small-boat 
basin. For additional details see page 1014 of Annual Report for 
1965. (See Table 31-B for authorizing legilsation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Two inactive pulpwood wharves and 
several fish wharves, all privately owned. Facilities are considered 
adequate for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys and environmental studies were performed by Government 
forces at a cost of $23,896. An adjustment of -$45,227 was 
made on the contract for repair of the East and West Breakwater 
completed last FY. Supervision and administration cost $17,511. 
Existing project is complete. Total costs of existing project to 
end of FY were $3,643,950. 
20. GRAND TRAVERSE BAY 
HARBOR, MI 
Location. At mouth of Traverse River on eastern shore of Keweenaw 
Peninsula about 20 miles northeasterly from Portage entry 
to Keweenaw Waterway. (See NOAA Nautical Chart 14964.) 
Existing project. Provides two parallel piers, an entrance channel 
between piers and a harbor basin. Project depths are 12 feet 
between piers and 10 feet in basin. Project area extended 200 
feet upstream in 1966. For additional details see page 1015 of 
Annual Report for 1965. (See Table 31-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. Local interests furnished 
easements on 5.1 acres of land. 
Terminal facilties. Several privately owned fishing wharves. 
Facilities are considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys were performed by Government forces at a cost of 
$2,466. A dredging contract was awarded and completed at a 
cost of $71,045, removing approximately 10,450 cubic yards of 
31-8

DETROIT, MI DISTRICT 
shoal material. Engineering, design, surveys, supervision and administration 
cost $14,073. 
Existing project was completed in 1950 except for extension 
of north pier completed in 1964. Steel cells and piers are in good 
condition. Total costs of existing project to end of FY were 
$1,928,274. 
21. GREEN BAY HARBOR, WI 
Location. At mouth of Fox River, at head of Green Bay, about 
180 miles from Milwaukee, WI, via Sturgeon Bay Canal, and 
about 49 miles southwest of Menominee Harbor, MI, and WI. 
(See NOAA Nautical Chart 14918.) 
Previous projects. See page 1366 of Annual Report for 1962. 
Existing project. See Chicago District 1979 Annual Report, 
Table 30-C, p. 30-30. 
For more detailed description of project see page 1216 of Annual 
Report for 1963. 
Cost of completed portion of project is $9,335,000 Federal, 
and non-Federal cost is $490,000 including $100,000 contributed 
funds. Local interests requested that the inactive portion of the 
1962 River and Harbor Act, consisting of dredging the reach from 
150 feet downstream of the C.&N.W. Railway Bridge to 1,700 
feet upstream of this bridge, be reactivated and the authorization 
modified to include deepening the adjacent turning basin and 
modifying the C.&N.W. Railway Bridge to provide increased 
horizontal clearance. Estimated cost of this portion (1986) is 
$3,960,000 Federal and $1,436,000 non-Federal which includes 
$1,320,000 local contribution. Section 601c of the Water 
Resources Development Act (W.R.D.A.) of 1986 authorized 
deepening the Fox River Channel, Green Bay, WI, to 27 feet. 
(See Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 16 wharves for handling coal, 
petroleum products, cement, limestone, general overseas cargo 
and miscellaneous commodities. Facilities are considered adequate 
for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, miscellaneous inspections and 
reports were performed at a cost of $264,061. Maintenance of 
the disposal area was performed by hired labor at a cost of 
$126,426. The contract for maintenance dredging the Bay Section 
awarded last FY was completed removing approximately 
52,791 cubic yards of material at a cost of $540,000. A contract 
was awarded this FY for maintenance dredging the Inner Section. 
The contract is 25% complete with approximately 28,280 
cubic yards being removed at a cost of $300,000. A contract for 
maintenance dredging the Outer Bay portion was awarded in the 
amount of $824,720. No work was performed this FY. Engineering, 
design, surveys, supervision and administration cost 
$154,354. Engineering and design for construction of a confined 
disposal facility continued at a cost of $205,760. 
Existing project is complete. The 1962 modification was started 
in November 1966 and completed in September 1973, except for 
dredging the reach from 150 feet downstream of the C.&N.W. 
Railway Bridge to 1,700 feet upstream of this bridge. Dredging 
of the turning basin above Chicago & Northwestern Railway 
Bridge was commenced in August 1938. The turning basin was 
enlarged under authority of Section 5 of the River and Harbor 
Act of March 4, 1915, in order to provide sufficient area for the 
large ships that use it. The work was performed as part of a 
maintenance dredging contract in September and October 1973. 
East revetment at Grassy Island was entirely removed in July 
1935. Dredging Fox River and entrance channel to Tail Point 
Light was completed in September 1967. The total cost of the 
existing project was $33,890,241, of which $18,005,884 were 
regular funds and $940,800 Public Works funds; $9,946,395 for 
new work and $23,943,846 for maintenance. The new work costs 
do not include $100,000 contributed funds. 
22. HAMMOND BAY HARBOR, MI 
Location. On northwest shore of Lake Huron, 35 miles 
southeast of Straits of Mackinac. (See NOAA Nautical Chart 
14881.) 
Existing project. Provides for a harbor of refuge; protected 
by breakwater structures, extending to 12-foot depth contour in 
the lake; for dredging a harbor basin 10 feet deep; and for dredging 
an entrance channel 12 feet deep. (See Table 31-B for 
authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Public facilities being planned by State and 
local agencies. Plans and specifications are complete, but construction 
has not started. 
Operations during fiscal year. Maintenance: Condition 
surveys were performed by Government forces at a cost of 
$8,284. In connection with the Section 111 project, an adjustment 
of -$647 was made to a monitoring contract for sediment 
samples. 
The existing project was completed in 1965. Total costs of existing 
project to end of FY were $1,576,538, of which $1,092,366 
was for new work and $484,172 for maintenance. 
23. HARBOR BEACH HARBOR, MI 
Location. On west shore of Lake Huron about 60 miles north 
of Port Huron, MI. (See NOAA Nautical Chart 14862.) 
Existing project. Harbor of refuge protected by three 
breakwaters; a main entrance 23 feet deep; and an anchorage area 
21 feet deep. For additional details see page 1485 of Annual 
Report for 1962. (See Table 31-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. Coal and limestone are received at a private 
wharf. In addition, there is a public recreational craft pier, a Coast 
Guard pier, and several small installations engaged in docking 
and servicing light-draft commercial and recreational vessels. 
These facilities satisfy current commerce and traffic requirements. 
Operations during fiscal year. Maintenance: Condition 
surveys, miscellaneous inspections and reports were performed 
by Government forces at a cost of $53,921. A contract was awarded 
this FY for repairs to south revetment in the amount of 
$214,588. No work was performed this FY. An adjustment of 
$9,845 was made to the maintenance dredging contract completed 
last FY. Engineering and design for repair of main breakwater 
was performed at a cost of $105,823. Engineering, design, 
surveys, real estate, supervision and administration cost $83,011. 
Existing project was completed in 1928. For additional details 
on completion of existing project see page 1485 of Annual Report 
for 1962. Total costs to end of FY were $7,917,823, of which 
$1,200,598 was for new work, $6,522,721 for maintenance, and 
$194,504 for rehabilitation. 
31-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
24. HARRISVILLE HARBOR, MI 
Location. On the west shore of Lake Huron, 20 miles north 
of Oscoda and 30 miles south of Alpena. (See NOAA Nautical 
Chart 14864.) 
Existing project. A harbor of refuge protected by breakwater 
structures, and dredging an entrance channel 12 feet deep and 
a harbor basin 10 feet deep. (See Table 31-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Dockage facilities built by State and local 
agencies for recreational craft; considered adequate for existing 
commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, miscellaneous inspections and 
reports were performed by Government forces at a cost of 
$15,069. A contract for maintenance dredging the harbor was 
awarded this FY and is approximately 99% complete at a cost 
of $170,492, removing approximately 48,213 cubic yards of 
material. This contract was also for beach nourishment. Engineering, 
design, surveys, supervision and administration cost $29,582. 
Condition surveys and environmental studies in conjunction with 
the Section 111 project cost $21,926. Beach nourishment in conjunction 
with above maintenance dredging contract cost $18,625. 
Engineering, design, supervision and administration cost $1,336. 
Total costs of project to end of FY were $3,688,325, of which 
$2,639,392 was for new work (includes $287,454 contributed 
funds) and $1,048,933 for maintenance. 
25. HOLLAND HARBOR, MI 
Location. On east shore of Lake Michigan 95 miles northeasterly 
from Chicago, IL, and 23 miles southerly from Grand 
Haven, MI. (See NOAA Nautical Chart 14932.) 
Previous project. For details see page 1948 of annual Report 
for 1915 and page 1478 of Annual Report for 1938. 
Existing project. An outer breakwater protected approach 
channel in Lake Michigan, an entrance channel to Lake Macatawa 
protected by piers and revetments, a channel through Lake 
Macatawa into Black River, and a turning basin. Project depths 
are 23 feet in outer portion of approach channel decreasing to 
21 feet at outer end of inner piers, 21 feet to upper end of project, 
and 18 feet in turning basin. For additional details see page 
1458 of Annual Report for 1962. 
Widening bend of entrance channel into Lake Macatawa is in 
an active category as a result of a reclassification recommendation 
approved by the Office of the Chief of Engineers on August 
20, 1981. Estimated cost of this portion (1986) is $2,650,000, 
Federal and $1,244,000 non-Federal which includes $890,000 
local contribution. (See Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with for completed portions 
of project. Work authorized by Act of 1954 is subject to 
condition that work on either or both proposed modifications may 
be undertaken by the United States provided local interests furnish 
all lands except 1.5 acres of Federal lands, easements, rightsof-
way, and suitable spoil disposal areas for initial work and future 
maintenance; remove buildings and other structures, except existing 
revetments, from lands to be furnished; and hold the United 
States free from damages. 
Terminal facilities. Wharves are at inner end of Lake 
Macatawa, and used for handling coal, building materials, 
petroleum products, and miscellaneous commodities. Two shipbuilding 
yards are on south shore of the lake. Holland provides 
a public wharf for small craft. Facilities are considered adequate 
for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, miscellaneous inspections and 
reports were performed by Government forces at a cost of 
$147,288. Repairs to North and South breakwater connection Section 
Q were performed this FY by hired labor using the 
Cranebarge MANITOWOC at a cost of $64,621. Repairs to safety 
features were performed at a cost of $6,633. A contract for 
maintenance dredging of the outer harbor was completed at a cost 
of $98,909, removing approximately 19,046 yards of dredge 
material. This contract was also for beach nourishment. An adjustment 
of -$10,979 was made to the contract completed last 
FY for maintenance dredging. Engineering and design for repair 
of South Revetment, Sections J thru P, was performed at a cost 
of $102,971. Engineering, design, real estate, supervision and 
administration cost $62,843. Condition surveys, environmental 
studies and miscellaneous inspections in connection with Section 
111 of P.L. 90-483 were performed at a cost of $35,301. An 
adjustment of -$3,659 was made to the contract completed last 
FY for mitigation of shore damage. Beach nourishment in conjunction 
with above maintenance dredging contract cost $40,474. 
Engineering, design, supervision and administration cost $1,977. 
Existing project, with exception of widening bend in revetted 
entrance channel authorized by Act of September 3, 1954, was 
completed in 1957. For additional details on completion of existing 
project, see page 1460 of Annual Report for 1962. Costs 
of existing project to end of FY were $1,392,827 for new work 
($1,180,502 regular funds, $176,620 for previous project and 
$35,705 contributed funds), $16,045,339 regular funds for 
maintenance, and $502,452 regular funds for rehabilitation, for 
a total of $17,940,618. 
26. THE INLAND ROUTE, MI 
Location. A series of interconnected lakes and streams stretching 
across northern tip of Lower Peninsula of Michigan, and extends 
from Conway near Lake Michigan to Cheboygan on Lake 
Huron; a distance of 35 miles. Crooked and Indian Rivers are 
connecting channels in the waterway. (See NOAA Nautical Chart 
14886.) 
Existing project. Provides for a channel 30 feet wide and 5 
feet deep, with necessary widening at bends, through Crooked 
and Indian Rivers, and Crooked, Burt, and Mullett Lakes, and 
from Conway (west end of Crooked Lake) to navigation lock at 
Cheboygan; in Pickerel Channel from Pickerel Lake to Crooked 
Lake. It also provides for suitable jetties at head of Indian River. 
The addition of a lock and dam was approved by the Chief of 
Engineers on September 2, 1964, to correct a design deficiency. 
(See Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. None exist for commercial cargo-handling 
along the Crooked and Indian Rivers. Numerous small privately 
owned timber piers and wharves, some equipped with covered 
boat wells for serving and storing recreational craft, have been 
constructed. Landings maintained by hotel and resort operators 
are open to the public for transfer of passengers. Public docks 
31-10

DETROIT, MI DISTRICT 
are at Conway and Oden on Crooked Lake; the Village of Indian 
River, Topinabee, and Mullett Lake Village on Mullett Lake; 
and at Cheboygan. About 30 highways dead end at the water's 
edge, permitting public access for various marine activities. Dock 
facilities are considered adequate for existing traffic. 
Operations during fiscal year. Maintenance: The navigation 
lock was operated and maintained by the Village of Alanson at 
a cost of $66,644. In 1987 the lock was operated from April 25 
through May 1 from 9:00 a.m. to 5:00 p.m.; from May 2 through 
September 30 it was open from 6:00 a.m. to 10:00 p.m. Condition 
surveys, miscellaneous inspections and reports were performed 
by Government forces at a cost of $18,523. 
The existing project was completed in 1958. The lock and dam 
was completed in FY 1968. For additional details see page 1382 
of Annual Report for 1960. Total costs to end of FY were 
$3,609,522, of which $918,222 was for new work (includes 
$148,000 contributed funds) and $2,691,300 for maintenance. 
27. KENOSHA HARBOR, WI 
Location. On west shore of Lake Michigan about 35 miles 
south of Milwaukee and about 54 miles north of Chicago. (See 
NOAA Nautical Chart 14904.) 
Previous project. See page 1390 of Annual Report for 1962. 
Existing project. For detailed description see page 1237, Annual 
Report for 1963. Estimated (1986) Federal cost is $455,000 
exclusive of amounts expended on previous projects and $195,000 
non-Federal which includes $155,000 local contribution. (See 
Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Three wharves used for miscellaneous 
foreign overseas commodities and autos, and also several fishing 
wharves. While these facilities are considered generally adequate 
for existing commerce, more efficient use of existing terminals 
and utilization of available frontage for development of additional 
terminals should be made. 
Operations during fiscal year. New Work: Financial closeout 
of the terminated Section 107 project at Kenosha, WI, cost 
$1,072 in FY 87. Maintenance: Condition surveys, environmental 
studies, miscellaneous inspections and reports were performed 
by Government forces at a cost of $63,776. Repairs to Detached 
Breakwater-Section H and Confined Disposal Facility Filter Cells 
were performed by the Cranebarge MANITOWOC at a cost of 
$201,067. The contract awarded last FY for maintenance dredging 
and repair of confined disposal facility was completed at a 
total cost of $841,078. (Maintenance dredging cost $414,275 
removing approximately 38,200 cubic yards of material. Repair 
of confined disposal facility cost $426,803.) Engineering, design, 
surveys, supervision and administration were performed at a cost 
of $100,098. 
Existing project is complete except for dredging 25-foot strips 
adjacent to the north and south piers which will be completed 
after rehabilitation of the piers. The north and south piers were 
completed in 1900 and the breakwater in 1909. The north pier 
is in excellent condition. The south pier and breakwater are in 
generally good condition. The total costs of the existing project 
to end of FY were $10,764,193, of which $7,907,899 were 
regular funds and $27,658 Emergency Relief funds; $988,969 
being for new work, $8,504,949 for maintenance, and $1,270,275 
for rehabilitation. The new work costs do not include $3,000 contributed 
funds. 
28. KEWAUNEE HARBOR, WI 
Location. On west shore of Lake Michigan, about 105 miles 
north of Milwaukee, WI, and about 78 miles from Green Bay, 
via Sturgeon Bay Canal. Harbor is at mouth of Kewaunee River. 
(See NOAA Nautical Chart 14908.) 
Previous projects. See page 1375 of Annual Report for 1962. 
Existing project. See Chicago District 1979 Annual Report, 
Table 30-C, p. 30-31. 
Costs of completed project are $603,021, Federal, and $9,000 
non-Federal, exclusive of amount expended on previous projects. 
Uncompleted portion (estimated $200,000-July 1965) of 1935 
River and Harbor Act is considered inactive, and excluded from 
present cost estimate. The portion authorized by the 1960 River 
and Harbor Act was deauthorized in 1977. (See Table 31-B for 
authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Two car-ferry slips, a petroleum tank farm, 
a Corps of Engineers project office, and several fishing wharves. 
Facilities are considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, master plan, miscellaneous inspections and reports were 
performed by Government forces at a cost of $37,326. Minor 
repairs to diked disposal area were performed by hired labor at 
a cost of $8,912. Repairs to CDF were performed by the 
Cranebarge MANITOWOC at a cost of $8,642. Engineering and 
design for repair to N. Stub Pier Section A was completed at 
a cost of $74,587. A contract was awarded for repair of the N. 
Stub Pier Section A in the amount of $784,200. No work was 
performed this FY. Engineering, design, surveys, supervision 
and administration cost $29,606. 
Active portion of existing project is complete. The north pier 
was completed in 1897 and the remaining portion is in generally 
good condition. Rehabilitation of the south pier was completed 
in June 1967. Construction of north breakwater and shore connection, 
except for a gap of 150 feet about 830 feet from 
shoreward end, and removal of outer 706.5 linear feet of north 
pier was commenced in September 1935 and completed in June 
1937. Removed 500 linear feet of north pier in April/May 1963 
and widened and deepened the adjacent channel in 1965. Outer 
end of the north pier was struck and severely damaged by car 
ferry vessel in October 1973 and a 24-foot section at outer end 
was subsequently removed, thus reducing the structure to a length 
of 626 feet. Dredging entrance channel in interior basin to existing 
project depth was commenced in April and completed in 
October 1938. Kewaunee River is navigable to about 6.5 miles 
above mouth for craft drawing not more than 4 feet. Total cost 
of existing project to end of FY was $8,031,479, of which 
$758,333 was for new work ($183,021 regular and $420,000 
Emergency Relief funds) $6,655,846 regular funds for 
maintenance and $617,300 regular funds for rehabilitation. 
29. KEWEENAW WATERWAY, MI 
Location. In Lake Superior across Keweenaw Peninsula in upper 
peninsula of Michigan. The west entrance is 169 miles east 
of Duluth, MN. (See NOAA Nautical Chart 14972.) 
Existing project. A navigable channel, minimum width 300 
feet, 25 miles long, partially natural and partially artificial, across 
Keweenaw Peninsula via Portage Lake. For details see page 1121 
of Annual Report for 1963. (See Table 31-B for authorizing 
legislation.) 
31-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
The uncompleted portion of the project for navigation at Keweenaw 
Waterway, Houghton County, MI, authorized by the 
River and Harbor Act of Aug. 30, 1935, Public Law 409, 73rd 
Congress, which consists of extending the lower entrance 
breakwater by 2,000 feet, including the necessary alteration or 
replacement of structures due to channel deepening, was 
deauthorized by the Water Resources Development Act of 1986; 
Public Law 99-662-Nov. 17, 1986, 99th Congress, Title X. 
Local cooperation. None required. 
Terminal facilities. Six coal docks, a petroleum dock, and 
several general merchandise and miscellaneous wharves, all 
privately owned. Facilities are considered adequate for existing 
commerce. Also present is a government constructed recreational 
area with facilities to include a picnic area and small boat landing 
range. 
Operations during the fiscal year. Maintenance: Condition 
surveys, safety studies, and miscellaneous inspections and reports 
were performed by Government forces at a cost of $60,411. Safety 
maintenance was performed by hired labor at a cost of $804. 
The Derrickbarge COLEMAN performed breakwater repair at 
a cost of $477,670. Engineering and design for major repair of 
Section F, North Revetment to be performed by contract next 
FY continued at a cost of $54,245. The contract for repair of 
E. and W. Revetments awarded last FY is approximately 94% 
complete at a cost this FY of $2,050,000. Engineering, design, 
supervision and administration cost $134,606. The contract 
awarded last FY for construction of a confined disposal facility 
is 81 % complete at a cost this FY of $799,999.. Engineering and 
design during construction, supervision and administration for 
Dike Disposal cost $75,856. 
Active portion of the project is complete. Breakwaters are in 
generally good condition except for a weakness occurring in about 
300 feet of substructure of breakwater lower entrance, and major 
storm damage repairs needed for stone-covered portions of 
breakwater at upper entrance. Mooring pier at Lily Pond requires 
repairs to halt movement and permit dredging to project depth 
adjacent thereto. The flared revetment at the upper entry should 
be modified to restrict wave action from the stilling basin entrance. 
Total costs of existing project to end of FY were 
$21,615,625, of which $5,974,141 was for new work, and 
$15,641,484 for maintenance. 
30. LAKE ST. CLAIR, MI CHANNELS 
Location. Lake St. Clair, a section of Great Lakes connecting 
channels, is an expansive shallow basin having a vessel track 
length of about 15 miles from mouth of St. Clair River to head 
of Detroit River. (See NOAA Nautical Chart 14850.) 
Previous project. For details see page 2882, Annual Report 
for 1896; pages 1957-58, Annual Report for 1915; and page 1539, 
Annual Report for 1938. 
Existing project. An improved channel through Lake St. Clair 
800 feet wide, 27.5 feet deep, and about 14.5 miles long; extending 
from mouth of Southeast Bend cutoff channel at lower end 
of St. Clair River to head of Detroit River Channel. (See Table 
31-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. None 
Operations during fiscal year. Maintenance: Condition 
surveys, Hi-Fix surveys, support '" Water Control Center, environmental 
studies, inspections and reports were performed at 
a cost of $99,496. Environmental studies in connection with the 
extended navigation season cost $1,487. Minor disposal area 
maintenance, supervision and administration cost $4,943. 
Total costs for existing project at the end of FY were 
$20,035,875, of which $7,675,357 was for new work 
($6,010,582 regular funds and $1,008,595 public works funds) 
and $12,360,518 for maintenance. 
31. LELAND HARBOR, MI 
Location. A light-draft harbor on eastern shore of Lake 
Michigan at mouth of Carp River, about 40 miles north of 
Frankfort, MI, and 40 miles southwest of Charlevoix, MI. (See 
NOAA Nautical Chart 14912.) 
Existing project. Provides for a harbor of refuge consisting 
of a breakwater about 1,200 feet long, a protected anchorage and 
maneuver area about 3 acres in extent and 10 feet deep, a 12-foot 
deep flared approach channel decreasing in width to 90 feet, an 
existing south pier 440 feet long, a 35-foot long cellular extension 
to south pier, an entrance channel 6 feet deep and 40 feet 
wide extending to mouth of Carp River, and for elimination of 
existing north pier. (See Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Privately owned wharves on each side of 
river below the dam which is 400 feet above the river mouth. 
These wharves serve the local fishing interests and recreational 
craft. Public facilities are operated by the State and local agencies. 
All available dockage space is utilized. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, miscellaneous inspections and 
reports were performed by Government forces at a cost of 
$13,291. Minor repairs to navigation structures were performed 
this FY by hired labor at a cost of $1,843. A contract was awarded 
and completed for maintenance dredging this FY removing approximately 
16,630 cubic yards of shoal material at a cost of 
$68,614. Engineering, design, surveys, supervision and administration 
cost $16,411. 
The existing project was completed in 1932 except for the 1962 
authorization which was completed in 1967. The total costs to 
end of FY were $2,710,896, of which $1,027,089 was for new 
work, $1,613,129 for maintenance and $70,678 for rehabilitation. 
32. LEXINGTON HARBOR, MI 
Location. On southwest shore of Lake Huron, 20 miles north 
of Port Huron, MI. (See NOAA Nautical Chart 14862.) 
Existing project. Provides for two offshore breakwaters opening 
to the southeast and totaling about 2,400 feet long with provisions 
for recreational fishing on the main breakwater; an anchorage 
and maneuver area of about 5 acres, 8 feet deep; and 
a flared approach channel 10 feet deep, decreasing to 160 feet 
in width through the breakwaters. Project also provides for recreational 
fishing facilities. Estimated (1979) Federal cost for new 
work is $1,647,306 excluding $1,088,888 to be contributed by 
local interests. (See Table 31-B for authorizing legislation.) 
Local cooperation. Assurances of local cooperation were furnished 
by Michigan Department of Natural Resources to the 
Secretary of the Army. The cash contribution was $1,088,888. 
31-12

DETROIT, MI DISTRICT 
Terminal facilities. An existing public fishing pier of open 
pile construction is not adequate for existing and prospective commerce. 
Complete boating facilities are planned by State and local 
agencies in connection with the harbor construction. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, monitoring, inspections and 
reports and minor safety maintenance were performed by Government 
forces at a cost of $17,960. A contract for maintenance 
dredging was awarded in the amount of $169,975. No work was 
performed this FY. Engineering, design, surveys, supervision 
and administration cost $5,036. Condition surveys, monitoring 
and environmental studies under Section 111 mitigation were performed 
at a cost of $72,618. Engineering, design, supervision 
and administration under Section 111 were performed at a cost 
of $19,690. 
The existing project was completed during FY 1977. Total costs 
of existing project to end of FY were $4,055,710, of which 
$3,107,192 (includes $1,088,888 contributed funds) was for new 
work and $948,518 for maintenance. 
33. LITTLE LAKE HARBOR, MI 
Location. On south shore of Lake Superior 21 miles west of 
Whitefish Point and 30 miles east of Grand Marais, MI. (See 
NOAA Nautical Chart 14962.) 
Existing project. Provides for a small-craft harbor of refuge 
by dredging an entrance channel 12 feet deep from Lake Superior 
into Little Lake, suitably protected by breakwaters and 
revetments. (See Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Only terminal facility at project site consists 
of a public dock built by State of Michigan for light-draft 
craft. 
Operations during fiscal year. Maintenance: Condition 
surveys and environmental studies were performed by Government 
forces at a cost of $15,823. The design deficiency study 
continued at a cost of $56,369. An adjustment of -$66,126 was 
made in cost for maintenance dredging contract completed last 
FY. A maintenance dredging contract was awarded and completed 
this FY for $134,427 with approximately 26,700 cubic yards of 
shoal material removed. Engineering, design, surveys, supervision 
and administration cost $25,750. 
This project is considered complete; however, because of shifting 
sand, the harbor entrance shoals rapidly with the result that 
full project depth is not usually available. An analysis for the 
Design Deficiency Report was submitted to North Central Division 
in March 1978 and approved. A design deficiency letter 
report and Environmental Assessment were drafted this FY. Total 
cost at end of FY is $3,526,736. 
34. LUDINGTON HARBOR, MI 
Location. On east shore of Lake Michigan, 156 miles northeasterly 
from Chicago, IL, and 67 miles northerly from Grand 
Haven, MI. (See NOAA Nautical Chart 14937.) 
Previous project. For details see page 1951 of Annual Report 
for 1915, page 1491 of Annual Report for 1938, and page 1307 
of Annual Report for 1963. 
Existing project. Provides for an exterior basin in Lake 
Michigan protected by north and south breakwater, north 
breakwater is 1,800 feet long and south breakwater 1,700 feet 
long, 550 feet apart at outer ends, diverging at an angle of 90 
degrees, with shore connections, 1,103 and 2,004 feet long, 
respectively; for dredging exterior basin to 18 feet deep with a 
maximum width of 1,500 feet; for a channel with a depth of 29 
feet from deep water in Lake Michigan decreasing to 27 feet at 
the west end of the north pier, over a maximum width of 600 
feet; thence a channel with a depth of 27 feet, over a minimum 
width of 230 feet with necessary widening at Pere Marquette 
Lake; and for inner piers and revetments, 1,649 feet long on north 
and sufficiently long on the south for turn at Pere Marquette Lake. 
The estimated (1977) Federal cost for new work is $8,250,000. 
Estimated total costs for local interests is $147,000. (See Table 
31-B for authorizing legislation.) 
Local cooperation. Has been complied with. 
Terminal facilities. In addition to main terminal of Chesapeake 
& Ohio Railway Co., consisting of three car ferry slips, a wharf, 
and warehouses, there are several wharves which handle coal, 
limestone, and miscellaneous commodities. Facilities adequate 
for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, miscellaneous inspections and 
reports were performed by Government forces at a cost of 
$53,567. Minor repairs to the navigation structures were performed 
by hired labor at a cost of $8,397. Contract awarded last 
FY for repairs to N. Revetment and S. Breakwater is approximately 
98% complete at a cost this FY of $1,566,000. Engineering 
and design during construction for repair to the North Revetment 
and South Breakwater was performed at a cost of $3,900. 
Engineering and design for repair to the North Revetment Sections 
K, J-1 and S, and South Breakwater Sections D and E cost 
$46,933. An adjustment of -$25,000 was made to this project 
due to a claim by the Corps against North American Marine, Inc. 
to recover costs incurred when the North Revetment was damaged 
by the M/V Roger M. Keyes. Engineering, design, surveys, 
supervision and administration cost $110,598. Under the Section 
111 program, surveys, monitoring, supervision and administration 
cost $40,390. 
Existing project was completed in 1918. For additional details 
on completion of existing project see page 1469 of Annual Report 
for 1962. Total costs for existing project to end of FY were 
$19,733,092, of which $8,532,202 was for new work, 
$10,842,977 for maintenance, and $357,913 for rehabilitation. 
35. MACKINAC ISLAND HARBOR, MI 
Location. On the southeast side of Mackinac Island which lies 
just east of the Straits of Mackinac, the connecting waterway between 
Lakes Michigan and Huron. (See NOAA Nautical Chart 
14881.) 
Existing project. Provides for the construction of two 
breakwaters 910 and 950 feet long from Mission and Biddle 
Points, respectively. The breakwaters are of rubblemound construction. 
Estimated (1969) Federal cost for new work is 
$230,000, excluding $105,000 to be contributed by local interest. 
(See Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Consists of private piers used by small 
commercial vessels and light-draft passenger ferry boats. 
Facilities for recreational craft are provided by the State dock 
31-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
which is open to all on equal terms. These facilities satisfy current 
traffic requirements, however, they are usually hard pressed 
during the annual Chicago to Mackinac-Port Huron to 
Mackinac sailboat races. 
Operations during fiscal year. Maintenance: Condition 
surveys and miscellaneous inspections and reports were performed 
by Governemnt forces at a cost of $5,985. Engineering and 
design for repair of the rubblemound breakwater was performed 
at a cost of $48,241. A contract was awarded for repair of rubblemound, 
east breakwater in the amount of $1,763,300. No work 
was performed this FY. Real estate, supervision and administration 
cost $5,390 
The existing project was completed in 1967. Total costs to end 
of FY were $487,198, of which $334,089 ($105,004 Contributed 
Funds) was for new work and $153,109 for maintenance. 
36. MANISTEE HARBOR, MI 
Location. On east shore of Lake Michigan, 179 miles northeasterly 
from Chicago, IL, and 26 miles northerly from 
Ludington, MI (See NOAA Nautical Chart 14938.) 
Previous project. For details see page 1952 of Annual Report 
for 1915, and page 1493 of Annual Report for 1938. 
Existing project. An entrance channel in Lake Michigan protected 
by a breakwater, piers, and revetment; a channel in 
Manistee River to Manistee Lake; and Federal participation in 
cost of replacing Maple Street Bridge. Project depths are 25 feet 
in entrance channel and 23 feet in river channel. For additional 
details see page 1470 of Annual Report for 1962. (See Table 31-B 
for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Installations are on both sides of river and 
on Manistee Lake. Commerce handled includes coal, sand, salt, 
and general cargo. In addition, there is a Government wharf and 
a State and City owned recreational craft pier which is open to 
the public. These facilities satisfy current commerce 
requirements. 
Operations during fiscal year. Maintenance: Condition 
surveys, inspections and miscellaneous reports were performed 
by hired labor at a cost of $72,810. Repairs to safety features 
were performed at a cost of $8,292. The U.S. Cranebarge 
MANITOWOC performed repairs to north breakwater Sections 
A-1, and B-E, south breakwater Sections B, B-l, and M-O, south 
pier Sections J and K, and N revetment section H at a cost of 
$172,875. Engineering and design for repair of the south 
breakwater Sections M, N, O, and 0-1 cost $105,841. A contract 
awarded last FY for repair of the north revetment was completed 
at a cost of $378,149. Supervision and administration cost 
$46,479. 
Existing project was completed in August 1967. For additional 
details on completion of existing project see page 1470 of Annual 
Report for 1962. Total costs for existing project from regular 
funds to end of FY were $9,982,019, of which $2,696,522 was 
for new work, $5,911,333 for maintenance, and $1,374,164 for 
rehabilitation. 
37. MANITOWOC HARBOR, WI 
Location. On west shore of Lake Michigan about 79 miles 
north of Milwaukee and about 106 miles from Green Bay via 
Sturgeon Bay Canal. (See NOAA Nautical Chart 14922.) 
Previous projects. See page 1379 of Annual Report for 1962. 
Existing project. The total estimated (Oct. 1981) project cost 
is $3,080,000; the Federal cost is $1,085,000 and the non-Federal 
cost is $1,995,000, which is a cash contribution. See Chicago 
District Annual Report for 1979, Table 30-C. 
For detailed description see page 1228 of Annual Report for 
1963. Estimated costs (1970) of new work for 1968 modification 
are $81,000 Federal and $30,000 non-Federal which includes 
a cash contribution of $18,000. Work on the 1968 modification 
was postponed until 1982. The portion authorized by the 1962 
River and Harbor Act is inactive and estimated (1970) at 
$1,150,000, Federal, and $105,000 non-Federal. (See Table 31-B 
for authorizing legislation.) 
Construction of a small boat harbor within the existing harbor 
was authorized by the Chief of Engineers, June 26, 1979, and 
720-foot channel extension reaffirmed in July 1982, under 
authority of Section 107, 1960 River and Harbor Act, as 
amended. 
Local cooperation. Fully complied with for completed modifications. 
For 1968 modification local interests must make an annual 
cash contribution equivalent to 50% of the annual costs 
associated with construction and maintenance of the channel extension 
until such time that a second user utilizes the channel extension. 
Such a contribution is presently estimated at $14,200; 
provide without cost to the United States all lands, easements, 
and rights-of-way required for construction and subsequent 
maintenance, including suitable areas determined by the Chief 
of Engineers to be required in the general public interest for initial 
and subsequent disposal of dredged materials, and the 
necessary retaining dikes, bulkheads, and embankments therefor 
or the costs of such retaining works; hold and save the United 
States free from damages due to the construction works and subsequent 
use, operation, and maintenance of the project, not including 
damages due to the fault or negligence of the United States 
or its contractors; provide and maintain without cost to the United 
States adequate berthing areas at the docks adjacent to the improvement; 
accomplish at no cost to the United States all relocations 
and alterations of utilities necessary for the project; assume 
full responsibility for all project first costs in excess of the Federal 
cost limitation of $2,000,000; and comply with the Uniform 
Relocation Assistance and Real Property Acquisition Policies Act 
of 1970. 
Terminal facilities. Three car-ferry slips, a grain elevator, one 
shipbuilding yard, and three other wharves used for handling coal, 
building materials, cement, and miscellaneous commodities. 
While these facilities are considered adequate for existing commerce, 
it is believed the city should provide a suitable wharf with 
warehouse and railway connection open to the general public. 
Operations during fiscal year. Maintenance:. Condition 
surveys, environmental studies, miscellaneous inspections and 
reports were performed by Government forces at a cost of 
$41,879. Repairs to exterior dikes were performed by the 
Cranebarge MANITOWOC at a cost of $160,649. Maintenance 
of the disposal area was performed by hired labor at a cost of 
$15,914. Engineering and design for repair of S. Breakwater Sections 
B and F-l continued at a cost of $53,196. Engineering and 
design for repairs to the confined disposal facility cost $648. 
Supervision and administration cost $24,874. 
Existing project is completed except for the 1962 and 1968 
modifications. The 1962 modification is inactive. Work on the 
1968 modification was essentially completed in FY 83. The 
31-14

DETROIT, MI DISTRICT 
Federal modification, adopted July 15, 1985, included the expansion 
of the new entrance channel to the Section 107 project 
and extension of the rubblemound breakwater. The breakwater, 
completed in 1910, is in generally fair condition. Dredging a 
channel through the outer basin to existing project depth and 
removal of a portion of old north stub pier at the river entrance 
were completed in December 1937. Dredging river channel was 
completed in July 1942. Cost of existing project to end of FY 
was $3,959,991 for new work (includes $1,911,076 contributed 
funds) and $8,280,204 for maintenance; a total of $12,240,195. 
38. MARQUETTE HARBOR, MI 
Location. In Marquette Bay on south shore of Lake Superior, 
160 miles west of Sault Ste. Marie, MI, and 265 miles east from 
Duluth, MN. (See NOAA Nautical Chart 14970.) 
Existing project. Provides for a breakwater, and a harbor basin 
26.5 feet deep, giving a protected area of 350 acres. Project was 
modified in 1960 to provide a 27-foot depth in harbor area. (See 
Table 31-B for authorizing legislation.) 
Local cooperation. None required for earlier authorizations. 
Fully complied with for the 1960 Act. 
Terminal facilities. One ore dock, unused at present; two coal 
docks; one petroleum dock; and three other unused docks. There 
are also several small fish wharves without railroad connections. 
Facilities are considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, inspections and reports were performed by Government 
forces at a cost of $22,773. Repairs to navigation structures were 
performed by hired labor using the Derrickbarge COLEMAN 
at a cost of $159,161. Supervision and administration cost $3,415. 
Total costs of existing project to end of FY were $3,740,328, 
of which $1,282,893 was for new work, $1,991,678 for 
maintenance and $465,757 for rehabilitation. 
39. MENOMINEE HARBOR AND 
RIVER, MI AND WI 
Location. On Lake Michigan at the mouth of the Menominee 
River on the western shore of Green Bay, 16 miles northwest 
of the mouth of Sturgeon Bay, and 49 miles northeast of Green 
Bay Harbor, about 155 miles from Milwaukee via Sturgeon Bay 
Canal. The river forms the boundary between the commercial 
harbors at Marinette, WI, and Menominee, MI. (See NOAA 
Nautical Chart 14917.) 
Previous projects. See page 1361 of Annual Report for 1962. 
Existing project. See Chicago District Annual Report 1979, 
Table 30-C, page 30-26. 
For detailed description see page 1214, Annual Report for 
1963. The portion authorized by 1960 River and Harbor Act is 
inactive and estimated (1964) at $442,000 Federal, and $105,000 
non-Federal. Costs of completed new work exclusive of inactive 
work and amount expended on previous projects are $221,053 
Federal and $50,762 non-Federal, which includes a cash contribution 
of $36,762. (See Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with for completed work. 
Terminal facilities. There are 9 wharves for handling coal, 
limestone, pulp and miscellaneous commodities. City of 
Marinette, WI, provided a public wharf. Facilities are considered 
fairly adequate for existing commerce, except that there is need 
for a public wharf owned by City of Menominee, with warehouse 
and railway connection. 
Operations during fiscal year. Maintenance: Condition 
surveys, miscellaneous inspections and reports were performed 
by Government forces at a cost of $20,367. Minor repairs to S. 
Breakwater were performed by hired labor at a cost of $937. 
Supervision and administration cost $2,471. Engineering and 
design for site selection of a confined disposal facility for toxic 
level hazardous waste dredged material from the turning basin 
continued at a cost of $125,429. 
The project in effect prior to the modification of March 2, 1945, 
was completed in 1938. No additional work was necessary under 
the modification of March 2, 1945, to provide a depth of 12 feet 
in the extension of the channel to the vicinity of the Marinette 
Yacht Club, as project depth or more was available. The entrance 
piers were completed in 1884, were rehabilitated (1954-1964) 
and are in excellent condition. Dredging of the channel below 
the Marinette municipal wharf, together with enlarging the turning 
basin to existing project depth, was commenced in May 1938. 
Modification of the project authorized by the 1960 River and Harbor 
Act is inactive. Construction for the 1967 modifications was 
started August 17, 1968, and completed in October 1968. The 
costs of the existing project to end of FY were $570,238 for new 
work (includes $36,762 contributed funds), $2,518,243 for 
maintenance and $1,351,852 for rehabilitation; a total of 
$4,440,333. 
40. MILWAUKEE HARBOR, WI 
Location. On west shore of Lake Michigan about 85 miles 
north of Chicago, IL, and about 83 miles west of Grand Haven, 
MI. (See NOAA Nautical Chart 14924.) 
Previous projects. See page 1385 of Annual Report for 1962. 
Existing project. See Chicago District Annual Report for 1979, 
Table 30-C, page 30-26. For detailed description see page 1232 
of Annual Report for 1963. 
Completed new work costs are $6,937,804 Federal and 
$478,000 non-Federal, exclusive of amount expended on previous 
projects. The uncompleted portion authorized by the 1935 River 
and Harbor Act was placed in the inactive category in June 1973. 
Estimated costs are $119,000 (July 1972) Federal and $1,170,000 
(July 1972) non-Federal for this portion. Uncompleted portion 
1945 River and Harbor Act was deauthorized in 1977. (See Table 
31-B for authorizing legislation.) 
Local cooperation. Complied with for Acts of March 2, 1945, 
October 23, 1962, and July 14, 1960, except inactive portion of 
1945 Act. Act of August 30, 1935, provided that original dredging 
of outer harbor area be done by city of Milwaukee and city 
of Milwaukee be reimbursed at actual cost but not to exceed 10 
cents per cubic yard, place measurement, for original dredging 
done subsequent to authorization of work by Congress. Agreement 
covering dredging was executed by Secretary of War, 
February 23, 1934, after this work was originally authorized as 
part of public works program. City was reimbursed for 10 percent 
of dredging. 
Terminal facilities. Four car-ferry slips, and 57 other wharves, 
private and municipal, used for handling coal, grain, building 
materials, cement, petroleum products, and miscellaneous commodities. 
As facilities in inner harbor were inadequate for existing 
commerce, Milwaukee Harbor Commission has constructed 
nine docks in the outer harbor for handling general cargo. 
Operations during fiscal year. Rehabilitation: Environmental 
studies, miscellaneous inspections and reports were performed 
at a cost of $10,197. The contract for major rehabilitation of 
the North Pier and North Breakwater is approximately 99% complete 
at a cost this FY of $632,656. Engineering and design dur- 
31-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
ing construction cost $72,418. Engineering and design for Phase 
II of the rehabilitation project was completed at a cost of $61,123. 
A contract was awarded for major rehabilitation Phase II of the 
North Breakwater in the amount of $2,383,440. The contract is 
approximately 9% complete at a cost this FY of $280,000. 
Engineering and design for Phase III of the rehabilitation project 
cost $29,196. Supervision and administration was performed at 
a cost of $143,962. Maintenance: Condition surveys, environmental 
studies, miscellaneous inspections and reports were 
performed by Government forces at a cost of $222,073. An adjustment 
of -$3,896 was made for the General Design Memorandum 
for major rehabilitation of the Inner North Revetment and 
the detached North Breakwater. Hired labor maintenance of the 
diked disposal facility cost $34,622. Repair to S. Breakwater - 
Section E was performed by the Cranebarge MANITOWOC at 
a cost of $214,141. Engineering, design for breakwater, and 
revetment repair cost $8,116. The contract awarded last FY for 
maintenance dredging and CDF repairs was completed this FY. 
Maintenance dredging was completed at a cost of $1,522,921 
removing 307,656 cubic yards of material. CDF repairs were 
completed at a cost of $549,457. Engineering, design, surveys, 
supervision and administration cost $205,722. 
Existing project is complete except for inactive portions. The 
1962 modification was completed in July 1967. North breakwater 
and shore connection, 9,954 feet long, was completed in August 
1925. North pier was completed in 1905 and construction of south 
pier was completed in November 1910. Construction of south 
breakwater and shore connection was completed in October 1929. 
Before modification of August 30, 1935, City of Milwaukee also 
dredged most of the area in the outer harbor south of inner entrance 
piers and lakeward of pierhead line to more than 21 feet 
below datum without cost to the United States. City of Milwaukee 
also dredged a portion of the area of the outer harbor north of 
inner entrance piers to provide an approach channel to the 
passenger and auto pier opposite East Claybourn Street. Work 
on the 1945 modification was completed in August 1957, except 
for inactive portion which consists of dredging the Milwaukee 
River from Buffalo Street to upper limit of the project at Humbolt 
Avenue. In recent years, some repairs were completed on 
the north shore breakwater; however, additional repairs are required 
and are scheduled to be accomplished in Phase III of the 
major rehabilitation effort underway. South breakwater and shore 
connections are in generally good condition. Costs of existing 
project were $8,231,024 for new work, $33,686,606 for 
maintenance, and $8,251,651 for rehabilitation; a total of 
$50,169,281. 
41. MONROE HARBOR, MI 
Location. On lower reach of River Raisin, which empties into 
Lake Erie and is 36 miles south of Detroit, MI. (See NOAA 
Nautical Chart 14830.) 
Existing project. Provides for a channel in Lake Erie and River 
Raisin to City of Monroe, for a turning basin, and for riprapping 
protecting dikes at river mouth. Project depths are 21 feet 
to turning basin, 18 feet in turning basin, and 9 feet to upstream 
end of project. For additional details see page 1490 of Annual 
Report for 1962. Project feature for riprapping protecting dikes 
is considered inactive. Estimated cost of this feature (1954) is 
$90,000. (See Table 31-B for authorizing legislation.) 
The Water Resources Development Act (W.R.D.A.) of 1986 
�authorized modifications to deepen the River Raisin portion of 
the existing 200 foot navigation channel from 21 to 27 feet between 
the existing turning basin and the river's mouth; deepen 
the lake channel from 21 to 28 feet, and widen the channel from 
200 to 500 feet, for a distance of approximately 47,000 feet from 
the river's mouth to the Maumee Bay Entrance Channel; dredge 
a new turning basin 24 feet deep, with a diameter of at least 1,600 
feet, at the river's mouth; and construct a 190 acre confined 
disposal area in Plum Creek Bay behind which would enable the 
creation of a 700 acre marsh. Estimated cost (Oct. 86) is 
$143,600,000; which includes $56,114,000 Federal and 
$87,486,000 non-Federal. 
Local cooperation. Fully complied with for completed portion 
of project. Local cooperation items for the newly authorized 
project in the W.R.D.A. for 1986 (P.L. 99-662), are as 
described in the Rivers and Harbors Committee Document 22, 
71st Congress, 1st Session; R & H Comm. Doc. 12, 72d Congress, 
1st Session, and 45, 75th Congress, 1st Session, and also 
includes, as a result of P.L. 99-662, construction cost sharing 
as follows: 
a. Contribute in cash 25 percent of the total cost of construction 
of general navigation facilities, exclusive of aids to navigation, 
a contribution presently estimated at $18,705,000. The 
estimated cash contribution of $18,705,000 to be paid in lump 
sum prior to initiation of construction, or in annual installments 
during the construction period at a rate proportionate to the proposed 
or scheduled expenditure of Federal funds as required by 
the Chief of Engineers, or under another arrangement satisfactory 
to the Secretary of the Army, the final apportionment of cost 
to be made after actual costs have been determined; and 
b. Repay, with interest, over a period of up to 30 years following 
project completion, 10 percent of the total cost of construction 
of general navigation facilities, an amount presently estimated 
at $7,482,000. The Secretary of the Army may count against all 
or part of the 10 percent repayment, the amount of the local contribution 
for lands, easements, rights-of-way, dredged/demolition 
material disposal sites and relocations. In no case are these 
costs to count against the cash payment during construction, and 
in no case would the amount waived exceed 10 percent of project 
cost. 
c. The confined dike area construction is a non-Federal responsibility 
and is estimated to cost $68,000,000. 
Terminal facilities. Several privately owned docks and a 
municipal terminal. Port of Monroe Authority built a steel and 
concrete wharf on southeast side of turning basin for commercial 
use. Facilities are considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, miscellaneous inspections and 
reports were performed by Government forces at a cost of 
$75,181. Maintenance of the disposal facility was performed by 
hired labor at a cost of $102,242. The maintenance dredging contract 
awarded last FY was completed at a cost of $65,425. An 
equitable adjustment to this contract was made in the amount of 
$259,575 due to an underrun of more than 15% below the 
estimated contract quantity. Another contract for maintenance 
dredging awarded last FY was completed with 129,766 cubic 
yards removed this FY at a cost of $967,029. Engineering and 
design for repair of confined disposal facility - Cell #1 to be performed 
by contract next FY cost $41,946. Engineering, design, 
surveys, supervision and administration cost $66,377. Final contract 
cost for construction of a confined disposal facility completed 
in FY 85 was $29,993. An adjustment of $5,442 was made 
to the contributed funds for engineering and design of the confined 
disposal facility. Engineering during construction, supervision 
and administration cost $4,888. 
31-16

DETROIT, MI DISTRICT 
Total costs to end of FY were $54,007,458, of which $987,340 
was for new work (including $300,000 contributed by the Port 
Commission of Monroe), and $53,020,118 for maintenance including 
$166,667 contributed funds. ($125,000 by Consolidated 
Paper Company and $41,667 by River Raisin Company.) 
42. MUSKEGON HARBOR, MI 
Location. On east shore of Lake Michigan, 114 miles northeasterly 
from Chicago, IL, and 80 miles easterly from Milwaukee, 
WI (See NOAA Nautical Chart 14934.) 
Previous project. For details see page 1950 of Annual Report 
for 1915; page 1399, Annual Report for 1924; and page 1484, 
Annual Report for 1938. 
Existing project. A breakwater protected outer basin in Lake 
Michigan and an entrance channel from Lake Michigan to 
Muskegon Lake protected by piers and revetments. Project depths 
vary from 29 feet in the lakeward portion of the outer basin to 
27 feet in the channel between the inner piers to Muskegon Lake. 
For additional details see page 1303 of Annual Report for 1963. 
(See Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Several privately owned wharves primarily 
for commercial use. Details on actual port and harbor facilities 
are in Port Series, No. 48 (revised 1981) prepared and published 
by the Water Resources Support Center. Facilities are considered 
adequate for existing commerce. 
Operations during fiscal year. Rehabilitation: An adjustment 
of $43,992 was made to the contract last FY for major rehabilitation 
of the North and South Revetment. Engineering and design 
cost $10,940. Supervision and administration cost $29,153. 
Maintenance: Condition surveys, environmental studies, 
miscellaneous inspections and reports were performed by Government 
forces at a cost of $63,368. Safety maintenance and repairs 
to Navigation Structures were performed at a cost of $12,168. 
Engineering, design, supervision and administration cost $1,705. 
Condition surveys and environmental monitoring was performed 
in conjunction with the authorized Section 111 project at a 
cost of $40,619. Engineering, design, real estate, supervision and 
administration cost $17,771. 
Existing project, including latest project modification, was completed 
in 1965. For additional details on completion of existing 
project see page 1465 of Annual Report for 1962. Total costs 
to end of FY were $24,301,564, of which $3,017,110 was for 
new work, $7,468,791 for maintenance, and $13,815,663 for 
rehabilitation. 
43. NEW BUFFALO HARBOR, MI 
Location. At mouth of Galien River on southeast shore of Lake 
Michigan in Berrien County, about 45 miles easterly from 
Chicago, IL. (See NOAA Nautical Chart 14905.) 
Existing project. Provides for an entrance channel 10 feet deep 
by 80 feet wide and 850 feet long, to mouth of Galien River; 
new north and south breakwaters 1,305 and 740 feet long, respectively, 
and deepening inner channel to Galien River to 8 feet and 
80 feet wide and 1,250 feet long. (See Table 31-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. One village owned boat ramp and three 
privately operated marinas, and a private boat club facility. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, miscellaneous inspections and 
reports were performed at a cost of $5,897. Minor repairs to 
navigation structures were performed by hired labor at a cost of 
$45. Engineering, design, real estate, supervision and administration 
cost $4,115. 
Existing project is complete. Total costs at end of FY were 
$4,268,096, of which $1,285,716 was for new work and 
$2,982,380 for maintenance. Contributed funds were in the 
amount of $1,186,467. 
44. ONTONAGON HARBOR, MI 
Location. On south shore of Lake Superior. It consists of improvement 
of mouth of Ontonagon River. (See NOAA Nautical 
Chart 14965.) 
Previous project. For details see page 1931 of Annual Report 
for 1915, and page 1406 of Annual Report for 1938. 
Existing project. Provides for approach channel 16 feet deep, 
a channel between piers with 17 and 15-foot depths, an inner basin 
12 feet deep, and maintenance of channels, basin, and entrance 
piers. Completed project cost $19,619. See page 1100 of Annual 
Report for 1966 for details. A modification authorized by 
1962 River and Harbor Act provides for increasing depths of 
channels, construction of an inner basin and a sedimentation basin. 
(See Table 31-B for authorizing legislation.) 
The turning basin feature of the project for navigation at Ontonagon 
Harbor, Ontonagon County, MI, authorized by the River 
and Harbor Act of 1962, was deauthorized by the Water 
Resources Development Act of 1986; Public Law 99-662 - Nov. 
17, 1986, 99th Congress, Title X. 
Local cooperation. None required. 
Terminal facilities. There are no publicly owned wharves. 
There are three coal wharves, an oil receiving facility, and a few 
small fish wharves. Facilities are considered adequate for existing 
commerce. 
Operations during fiscal year. New Work: A total of $48,354 
was spent in FY 87 on two studies: $42,635 for the Section 205 
Draft Definite Project Report, and $5,719 to closeout the terminated 
Section 103 study. Maintenance: Condition surveys and 
environmental studies were performed by Government forces at 
a cost of $32,163. Repairs to the East and West breakwaters were 
performed by hired labor using the Derrickbarge COLEMAN 
at a cost of $65,186. The General Design Memorandum 
for major repairs to the North and South Piers and Revetments 
was performed at a cost of $23,210. An adjustment of -$959 was 
made on a dredging contract completed last FY. A contract for 
maintenance dredging was awarded and completed this FY at a 
cost of $260,680 removing 54,101 cubic yards of material. 
Engineering, and design for maintenance dredging to be performed 
by contract next FY cost $15,193. Other engineering, design, 
surveys, supervision and administration cost $25,524. 
All work authorized under previous Acts was completed in 
1938. Total costs of existing project to end of FY were 
$9,033,267, of which $922,822 was for new work and 
$8,110,445 for maintenance. 
45. PENTWATER HARBOR, MI 
Location. On east shore of Lake Michigan, 146 miles northeasterly 
from Chicago, IL, and 14 miles southerly from 
Ludington, MI. (See NOAA Nautical Chart 14907.) 
31-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Existing project. Provides for widening old entrance channel 
to 150 feet between parallel piers and revetments, channel to extend 
from Lake Michigan to Pentwater Lake, with a depth of 16 
feet. Piers and revetments are built of stonefilled timber cribs 
and piling and capped with concrete. The 200-foot extension to 
south pier portion of project is considered inactive. Estimated 
cost (1954) of this portion is $65,100. (See Table 31-B for 
authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. Several small privately owned wharves 
on west end of Pentwater Lake. The City and Michigan Waterways 
Commission jointly constructed a dock on northwest side 
of Pentwater Lake for public use. Facilities are considered adequate 
for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, inspections and reports were performed 
by Government forces at a cost of $31,371. Repairs to 
north and south piers were performed by hired labor using the 
Cranebarge MANITOWOC at a cost of $86,990. A maintenance 
dredging contract was awarded and completed this FY removing 
approximately 20,784 cubic yards of shoal material at a cost 
of $80,572. Engineering, design, surveys, supervision and administration 
cost $23,571. 
Existing project was completed in 1959 except for a 200-foot 
extension to the south pier which is not considered necessary 
under present conditions. For additional details see page 1468 
of Annual Report for 1962. Total costs for existing project at 
end of FY were $3,421,732, of which $179,899 was for new 
work, and $3,241,833 for maintenance. 
46. POINTE LOOKOUT HARBOR 
(AU GRES RIVER), MI 
Location. At Au Gres River on westerly shore of Lake Huron 
at entrance to Saginaw Bay, about 17 miles northeast of mouth 
of Saginaw River. (See NOAA Nautical Chart 14863.) 
Existing project. Provides for construction of a small boat harbor 
having a 12-foot deep, 100-foot wide, 2-,800-foot long outer 
entrance channel; a 5,600-foot long, 100-foot wide inner entrance 
channel having a 10-foot depth; an 8,270-foot long, 6-foot deep 
river channel ending just downstream from U.S. 23 highway 
bridge and having a width of 60 feet; a 4,000-foot long north 
breakwater and a 3,800-foot long south breakwater. (See Table 
31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Small boat marina facilities are under construction 
by the State of Michigan. 
Operations during fiscal year. Maintenance: Condition 
surveys, miscellaneous inspections and reports were performed 
by Government forces at a cost of $20,517. Contract awarded 
in FY 85 for repair of East and West Breakwater was completed 
this FY with a cost adjustment of-$2,644. Engineering, design, 
supervision and administration cost $17,611. 
Existing project was completed in 1974. Total costs to end of 
FY were $5,733,188, of which $2,642,584 was for new work 
and $3,090,604 for maintenance. 
47. PORTAGE LAKE HARBOR, MI 
Location. On east shore of Lake Michigan about 186 miles 
northeasterly from Chicago, IL, and about 37 miles northerly 
from Ludington, MI. (See NOAA Nautical Chart 14939.) 
Existing project. Provides for a harbor of refuge with an entrance 
channel from Lake Michigan to Portage Lake protected 
by piers and revetments. Project depth is 18 feet. For additional 
details see page 1297 of Annual Report for 1958. (See Table 31-B 
for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. There are landing places and marinas at 
inner end of Portage Lake. Facilities are considered adequate for 
existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, inspections and reports were performed by Government 
forces at a cost of $14,664. 
Existing project was substantially completed in 1912. For additional 
details on completion of existing project see page 1298 
of Annual Report for 1958. The structures are generally in fair 
condition. Total cost of existing project to end of FY is 
$1,821,200. 
48. PORT AUSTIN HARBOR, MI 
Location. On west shore of Lake Huron "at extreme 
southeastern limit of Saginaw Bay, and 29 miles south of Au Sable 
River (Oscoda). (See NOAA Nautical Chart 14863.) 
Existing project. A harbor of refuge at the mouth of Bird 
Creek, consisting of a harbor basin dredged to a depth of 10 feet 
protected by a breakwater structure, and for dredging an entrance 
channel to the harbor basin to a depth of 12 feet. (See Table 31-B 
for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. A number of docks near mouth of Bird 
Creek and a State-owned dock inside breakwater. Facilities accommodate 
recreational craft and are considered adequate for existing 
traffic. 
Operations during fiscal year. New Work: While only $5 was 
spent this FY, supplemental FY 87 funds were provided in late 
Sept. 87 to initiate obtaining a Local Cooperation Agreement 
(LCA) for an additional breakwater authorized by the Supplemental 
Appropriations Act, 1987, Public Law 100-71, dated July 11, 
1987. Maintenance: Condition surveys, miscellaneous inspections 
and reports were performed by Government forces at a cost of 
$12,040. An adjustment of -$24,999 was made for contract 
awarded FY 85 for breakwater access. Liquidated damages were 
assessed the contractor due to late completion, adjusting supervision 
and administration cost to -$42,896. 
Total costs of existing project to end of FY were $2,901,203, 
of which $1,179,087 was for new work (includes $172,100 contributed 
funds) and $1,722,110 for maintenance. 
49. PORT SANILAC HARBOR, MI 
Location. On southwest shore of Lake Huron, 30 miles north 
of Port Huron, MI. (See NOAA Nautical Chart 14862.) 
Existing project. Provides for a harbor of refuge protected 
by breakwater structures extending to 12-foot depth contour in 
lake; for dredging a harbor basin 10 feet deep; for dredging an 
entrance channel 12 feet deep; a 70-foot extension of the south 
breakwater; a 300-foot arm added to the north breakwater; and 
31-18

DETROIT, MI DISTRICT 
riprap placed at the lakeward side of the breakwater additions. 
(See Table 31-B for authorizing legislation.) 
Local Cooperation. Fully complied with. 
Terminal facilities. There is one privately owned dock used 
principally as a fishing terminal by owner and a municipally 
owned pier for recreational craft. Facilities are considered adequate 
for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, were performed by Government forces at a cost of 
$27,000. A contract for maintenance dredging and beach nourishment 
was awarded in the amount of $276,282. No work was performed 
this FY. Engineering, design, supervision and administration 
cost $24;263. Condition surveys, inspections and reports 
under Section 111 mitigation were performed at a cost of $42,649. 
Engineering, design, supervision and administration under Section 
111 mitigation cost $2,829. 
The project was completed in 1951 except for latest modification 
which was completed in FY 76. The breakwaters are in good 
condition. Total costs of existing project to end of FY were 
$4,328,722 (includes $2,120,593 contributed funds). 
50. PRESQUE ISLE HARBOR, MI 
Location. On south shore of Lake Superior at Marquette, MI. 
It is an identation about 1.5 miles long and one-half mile wide 
in shore behind Presque Isle Point. (See NOAA Nautical Chart 
14970.) 
Existing project. A breakwater off Presque Isle Point and 
dredging harbor to depth of 28 feet at inner portion with 30 feet 
at entrance. For details see page 1021 of 1965 Annual Report. 
(See Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. One merchandise and petroleum receiving 
wharf and one ore dock. Facilities are considered adequate 
for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, miscellaneous inspection and 
reports were performed by Government forces at a cost of 
$29,727. Repairs to the breakwater, riprap concrete portion, were 
performed by hired labor using the Derrickbarge COLEMAN 
at a cost of $147,187. Engineering, design, supervision and administration 
cost $80. 
Project authorized by earlier Acts was completed in 1939. A 
contract for harbor deepening authorized by 1960 Act was completed 
in April 1962, except for a section where rocks were encountered 
in southeast portion of harbor. Rock removal has been 
accomplished intermittently by hired labor and the project is completed. 
Breakwater is in good condition. A Section 111 project 
was approved by Chief of Engineers in October 1981 providing 
a rock groin, beach restoration and nourishment program at vicinity 
of Shiras Park and 3,000 feet west of park. Total costs of existing 
project to end of FY are $2,227,888. 
51. ROUGE RIVER, MI 
Location. Rises in Oakland and Washtenaw Counties, MI, 30 
miles long, flows southeasterly through Wayne County, and joins 
Detroit River at westerly limit of City of Detroit. (See NOAA 
Nautical Chart 14854.) 
Previous project. For details see page 1530 of Annual Report 
for 1932, and page 1558 of Annual Report for 1938. 
Existing project. Provides for: (a) Main channel from Detroit 
River through Short Cut Canal extending to upstream limit of 
the project, a distance of 3.5 miles. Project depths are 25 and 
21 feet in navigation chanel, 21 feet in turning basin, and 13 feet 
in upper reach of project. (b) Old Channel from Detroit River 
extending to junction of Old Channel with Short Cut Canal. Project 
depths are 25, 18, 17, and 21 feet. For additional details see 
page 1324 of Annual Report for 1963. In 1973, work authorized 
by the 1962 River and Harbor Act was reclassified from the active 
to inactive category. Estimated cost (1972) of this work is 
$880,000. Except for dredging 25-foot channel 1,150 feet 
upstream from mouth of Old Channel, work authorized in Act 
of August 30, 1935, is considered inactive. Estimated cost (1958) 
of inactive portion is $255,000. Work authorized by Act of July 
3, 1958, is considered inactive. Estimated cost (1960) of this work 
is $210,000. (See Table 31-B for authorizing legislation.) 
Local cooperation. Act of October 23, 1962, requires local 
interests to provide lands and rights-of-way for construction upon 
request of the Chief of Engineers; hold the United States free 
from damages; provide terminal facilities to accommodate prospective 
commerce considered in report of District Engineer; 
dredge and maintain areas between the Federal improvement and 
terminal facilities to depths commensurate with improved Federal 
channel; make alterations in docks, bulkheads and other structures, 
and take such other measures as may be necessary to assure 
stability of banks adjacent to channel; and provide bridge protection. 
The assurances of local cooperation for the River and 
Harbor Act of 1962 were furnished by the Michigan State Waterways 
Commission and accepted on January 7, 1965. Fulfillment 
of all items of local cooperation has not been accomplished. 
Terminal facilities. Numerous large commercial docks for 
handling various type cargo. Details on actual port and harbor 
facilities are contained in the Port Series No. 45 (revised 1984) 
prepared and published by the Water Resources Support Center. 
Facilities are considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, master plan, inspections and 
reports were performed by Government forces at a cost of 
$147,280. Maintenance of the disposal area by hired labor cost 
$7,854. The contract for repairs to the confined disposal facility 
at Grassy Island awarded last FY was completed at a cost of 
$1,887,920. A contract was awarded for repair of the diked 
disposal facility at Pte. Mouillee and is approximately 94% complete 
at a cost of $147,977. A contract for maintenance dredging 
was awarded and completed this FY with approximately 22,454 
cubic yards of material removed at a cost of $338,061. Engineering 
and design for CDF repairs cost $2,241. Engineering and 
design for maintenance dredging cost $35,251. Surveys, supervision 
and administration cost $91,827. An adjustment of $5,580 
was made for engineering and design of the contract for construction 
of a Wetland Marsh under Section 150 of the Water 
Resources Development Act of 1967. Supervision and administration 
for Section 150 cost $9,434. Supervision and administration 
for dike disposal program cost $12. 
Work authorized before 1962 modification is complete or 
deauthorized. For additional details on completion of existing project 
see Annual Report for 1962. Total costs for existing project 
to end of FY were $33,581,610, of which $675,251 was for new 
work and $32,906,359 for maintenance. In addition, $29,563 was 
expended for new work from Emergency Relief Act Funds. 
31-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
52. SAGINAW RIVER, MI 
Location. Formed by union of Tittabawassee and Shiawassee 
Rivers, 22 miles long, and flows northerly into extreme inner 
end of Saginaw Bay, Lake Huron. Cities of Saginaw and Bay 
City are on the river. (See NOAA Nautical Chart 14867.) 
Previous project. For details, see page 1957 of Annual Report 
for 1915, and page 1550 of Annual Report for 1938. 
Existing project. Provides for an entrance channel 27 feet deep 
and 350 feet wide from 27-foot contour in Saginaw Bay to river 
mouth; thence a channel 26 feet deep and 200 feet wide to New 
York Central Railroad Bridge at Bay City; thence 22 feet deep 
and 200 feet wide to C&O Railroad Bridge in Saginaw; thence 
16.5 feet deep and 200 feet wide to upstream limit at Green Point. 
Project also provides for five turning basins; one 25 feet deep 
at Essexville, 600 feet wide with a maximum length of 1,850 feet; 
one 22 feet deep on east side of channel about 1 mile upstream 
from Cass Avenue in Bay City, 650 feet wide and 1,000 feet long; 
one 20 feet deep at Carrollton, 100 to 300 feet wide and 900 feet 
long; one 20 feet deep just downstream from C&O Bridge in 
Saginaw, 650 feet wide and 1,000 feet long; and one 15 feet deep 
between Bristol Street Bridge and New York Central Railroad 
Bridge in Saginaw. (See Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Numerous large commercial docks for 
handling a great variety of cargo. Details on actual port and harbor 
facilities are in Port Series No. 45 (revised 1984) prepared 
and published by the Water Resources Support Center. Facilities 
are considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, Hi-Fix surveys, environmental studies, inspection and 
reports were performed by Government forces at a cost of 
$502,870. A contract for maintenance dredging the bay section 
was completed at a cost of $668,536, removing approximately 
245,000 cubic yards of material. Another contract for 
maintenance dredging the mouth and upper river was awarded 
and completed at a cost of $1,104,241. Approximately 152,100 
cubic yards of dredged material was removed. Maintenance of 
disposal area was performed by hired labor at a cost of $10,122. 
Engineering, design, surveys, supervision and administration cost 
$137,077. Engineering and design for construction of a diked 
disposal area for upper Saginaw was continued at a cost of 
$149,558. The selected site at Crow Island State Game Area was 
rejected and site selection resumed. 
Existing project is complete except for small part of the work 
authorized by the Act of October 23, 1962. Section D (Sixth Street 
Turning Basin) of the 1962 Act is complete except for the channel 
portion, which is pending modification. Total costs for existing 
project to end of FY were $69,401,523, of which 
$14,930,727 was for new work and $54,470,796 for maintenance. 
53. ST. CLAIR RIVER, MI 
Location. A 40 mile long section of Great Lakes connecting 
channels which flows southerly from Lake Huron and discharges 
into Lake St. Clair. (See NOAA Nautical Chart 14852.) 
Existing project. Provides for channels through St. Clair 
River, which, at low water datum, are suitable for vessels drawing 
25.5 feet. Project also provides for improvement of North 
Channel outlet, 100 feet wide and 10 feet deep, for recreational 
craft. Project depths are referred to low water datums for Lakes 
Huron and St. Clair, 576.8 and 571.7 feet above mean water level 
at Father Point, Quebec; International Great Lakes Datum 1955. 
(See Tables 31-B and 31-H for authorizing legislation and features 
of existing project.) Act of July 24, 1946, provides for widening 
and deepening of southeast bend and improvement of outlet of 
north channel at an estimated cost (1986) of $870,000; $435,000 
Federal and $435,000 non-Federal. On June 16, 1969, the Director 
of Civil Works approved substitution of the Middle Channel 
of the St. Clair River for the authorized north channel. Subsequently, 
however, the work authorized by the River and Harbor 
Act of July 24, 1946, was deauthorized by the Water Resources 
Development Act of 1986; Public Law 99-662 - Nov. 17, 1986, 
99th Congress, Title X. 
Local cooperation. None required. 
Terminal facilities. This improvement serves through commerce, 
between upper and lower Great Lakes, and has not 
materially influenced terminal facilities along its route. A number 
of privately owned piers and wharves are at Port Huron, 
Marysville, St. Clair, and Marine City, MI, which handle coal, 
limestone, petroleum products, woodpulp, salt and general cargo. 
These installations satisfy present commerce requirements. 
Operations during fiscal year. Maintenance: Condition 
surveys, Hi-Fix surveys, support of water control centers, 
miscellaneous inspections and reports were performed by Government 
forces at a cost of $165,884. Environmental studies in connection 
with the extended navigation season cost $158,694. Location 
and removal of obstructions cost $507,599. A maintenance 
dredging contract was awarded this FY and is approximately 
46.6% complete with 92,233 cubic yards removed this FY at a 
cost of $659,999. Engineering, design, surveys, supervision and 
administration cost $27,491. 
Existing project is complete. Total cost of existing project to 
end of FY was $35,538,801, of which $19,213,246 was for new 
work and $16,325,555 for maintenance. 
54. ST. JOSEPH HARBOR, MI 
Location. On east shore of Lake Michigan, 60 miles easterly 
from Chicago, IL, and 24 miles southerly from South Haven, 
MI (See NOAA Nautical Chart 14930.) 
Previous project. For details see page 1945 of Annual Report 
for 1915, and page 1470 of Annual Report for 1938. 
Existing project. Provides for protecting mouth of St. Joseph 
River by two piers, 250 to 325 feet apart at their inner and outer 
ends, respectively, having lengths of 2,758 feet on north side and 
2,603 feet on south side; for a channel 21 feet deep from Lake 
Michigan to mouth of Benton Harbor Canal, a length of about 
6,900 feet with widths of 265 feet at outer end of piers, 190 feet 
at inner end of piers and revetments, thence generally 215 feet 
to lower end of turning basin, increasing to 250 feet above the 
turning basin to mouth of Paw Paw River, thence generally 110 
feet in Paw Paw River to mouth of Benton Harbor canal; for 
dredging channel in Benton Harbor canal up to west line of Riverview 
Drive extended northerly, to 18 feet deep and 80 feet wide; 
and a turning basin 18 feet deep on north side of channel above 
mouth of Morrison Channel and a turning basin 18 feet deep near 
mouth of Paw Paw River. Public Law 88-88th Congress declared 
a portion of Benton Harbor Canal a non-navigable stream. (See 
Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Several commercial wharves for handling 
coal, building materials, petroleum products, and 
31-20

DETROIT, MI DISTRICT 
miscellaneous commodities. A package freight terminal and a 
public docking facility is also available. Facilities considered adequate 
for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, safety and environmental studies, miscellaneous inspections 
and reports were performed by Government forces at a cost 
of $105,518. Repairs to North Revetment and N. and S. Piers 
were performed using the Cranebarge MANITOWOC at a cost 
of $86,998. Hired labor cost for maintenance of disposal area 
and safety features was $6,450. An adjustment of -$23,587 was 
made to the contract for dredging completed last FY. A contract 
was awarded and completed for dredging the Inner Harbor, Outer 
Channel, and excavation and repair of Whirlpool Interim Disposal 
Site, removing approximately 27,547 cubic yards of material at 
a cost of $168,544. Excavation of approximately 18,695 cubic 
yards of existing material and dike repair at Whirlpool Interim 
Disposal Site cost $99,744. Engineering and design for repair 
of North Pier Section A, South Pier Sections H and N and North 
Revetment Section B was performed at a cost of $109,667. 
Engineering, design, surveys, real estate, supervision and administration 
cost $80,208. Engineering and design for confined 
disposal area for polluted dredged material was continued at a 
cost of $37,592. Under the Section 111 Program, $298,450 was 
expended to complete a contract awarded last FY for beach 
nourishment. A contract awarded this FY to place sand on the 
beach is approximately 32% complete at a cost of $89,683. 
Monitoring, surveys, engineering, supervision and administration 
cost $132,301. 
Existing project was completed in 1956. The structures are in 
generally good condition. For additional details on completion 
of existing project see page 1454 of Annual Report for 1962. Total 
costs of existing project to end of FY were $15,425,647, of which 
$1,301,372 was for new work, $13,162,059 for maintenance and 
$962,216 for rehabilitation. 
55. ST. MARYS RIVER, MI 
Location. A Great Lakes connecting channel about 63 miles 
long, flows southeasterly between State of Michigan and Province 
of Ontario, Canada, from eastern end of Lake Superior into 
northern end of Lake Huron. (See NOAA Nautical Charts 
14882, 14883, and 14884.) At Sault Ste. Marie, MI, about 14 
miles downstream from Lake Superior, there are four parallel 
locks and a hydroelectric powerplant. 
Previous project. For details see page 1955, Annual Report 
for 1915; and page 1529, Annual Report for 1938. 
Existing project. Channels permitting 25.5-foot draft navigation 
in St. Marys River and Lake Superior and Lake Huron approaches 
thereto; constructing and operating four locks and two 
canals; constructing an electric plant of 14,000 kilowatt capacity 
(45,000 kilowatt ultimate capacity) constructing anchorage areas 
in river above and below locks; and constructing various other 
works in conjunction with project. Subsequently, in 1932, the 
Unit 10 powerhouse was installed raising the capacity to 18,400 
kilowatts (45,000 ultimate capacity). Original State locks were 
operated and maintained under permanent indefinite appropriation 
from June 9, 1881, to November 2, 1886, after which they 
were destroyed by excavation for the Poe Lock in 1896. Weitzel 
Lock, destroyed in 1942 by excavation for MacArthur Lock, was 
operated and maintained under the same appropriation from 
September 1, 1881, to June 30, 1935. Poe Lock was operated 
and maintained under the same appropriation from August 3, 
1896, Davis Lock from October 21, 1914, and Sabin Lock from 
September 18, 1919, to end of FY 1935. The 1,200 foot by 110 
foot new Poe Lock was authorized in 1962 and put into operation 
in 1968. Details of existing project are set forth in Table 31-F. 
Project depths are referred to low water datum corresponding 
to sloping surface of river as follows: Above locks: When water 
surface of Lake Superior is at elevation 600 feet and at upstream 
side of locks is 577.8 feet above mean water level at Father Point, 
Quebec (International Great Lakes Datum 1955). Estimated 
(1973) cost for new work is $164,630. (See Table 31-B for 
authorizing legislation.) 
The Water Resources Development Act (W.R.D.A.) of 1986 
authorized construction of a second lock 1,294 feet in length, 
115 feet in width, and 32 feet in depth, adjacent to the existing 
lock. The replacement lock is to be located in the North Canal 
of the St. Marys Falls Canal at Sault Ste. Marie, MI, on the site 
of the existing Davis and Sabin Locks. Material removed during 
construction of the replacement lock will be placed on the Northwest 
Pier to serve as a windbreak for downbound vessels approaching 
the lock. Estimated cost (Oct. 86) is $149,240,000 
Federal and $57,400,000 non-Federal. 
Local cooperation. Fully complied with for completed portion 
of project. Local cooperation items for the newly authorized 
project in the W.R.D.A. of 1986 (P.L. 99-662), are as follows: 
a) Provide without cost to the United States all lands, easements, 
and rights-of-way necessary for implementation and later 
maintenance of the proposed project, and for aids to navigation 
upon the request of the Chief of Engineers, including suitable 
areas determined by the Chief of Engineers to be required in the 
general public interest for initial and later disposal of dredged/
demolition material and including necessary retaining dikes, 
bulkheads, and embankments therefor, or the costs of such retaining 
works; 
b) Hold and save the United States free from damages due to 
the implementation and maintenance of the project, not including 
damages due to the fault or negligence of the United States or 
its contractors; 
c) Accomplish without cost to the United States such alterations 
and relocations of pipelines, powerlines, cables, sewer, 
water supply, drainage and other utilities, structures and improvements 
made necessary by the project (Any such costs of 
the items on Federal property at the locks, would be part of the 
total construction cost and not separable local sponsor costs.); 
d) Contribute in cash 25 percent of the total cost of construction 
of general navigation facilities, exclusive of aids to navigation, 
a contribution presently estimated at $57,400,000. The 
estimated cash contribution of $57,400,000 to be paid in lump 
sum prior to initiation of construction, or in annual installments 
during the construction period at a rate proportionate to the proposed 
or scheduled expenditure of Federal funds as required by 
the Chief of Engineers, or under another arrangement satisfactory 
to the Secretary of the Army, the final apportionment of cost 
to be made after actual costs have been determined; and 
e) Repay, with interest, over a period of up to 30 years following 
project completion, 10 percent of the total cost of construction 
of general navigation facilities, an amount presently estimated 
at $23,000,000. The Secretary of the Army may count against 
all or part of the 10 percent repayment, the amount of the local 
contribution for lands, easements, rights-of-way, dredged/dem- 
31-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
olition material disposal sites and relocations. In no case are these 
costs to count against the cash payment during construction, and 
in no case would the amount waived exceed 10 percent of project 
cost. 
f) Any construction needed to prevent/mitigate for erosion or 
shoaling attributed to the lock would be cost shared in the same 
proportion as the project. 
Terminal facilities. This improvement serves through commerce 
between Lake Superior and lower lakes and has not 
materially influenced terminal facilities at localities along its route. 
Three piers at Sault Ste. Marie receive coal and petroleum products. 
Limestone is shipped from a pier at Drummond Island. 
Vessel refueling stations are at Lime Island and Village of Detour; 
they receive coal and petroleum products. Present terminals 
satisfy current traffic requirements. 
Operations during fiscal year. Operations, maintenance, and 
care of locks: Two canals and three locks were operated (the 
fourth lock, Sabin, was out of service) as required. Necessary 
repairs and improvements were made thereto and to appurtenant 
structures and equipment. Canals were open to navigation 285 
days (from 1 October 1986 through 30 September 1987). During 
that period, a total of 11,134 vessels, aggregating 78,920,311 
short tons of freight and 273,151 passengers passed through the 
MacArthur, Poe and Davis Locks. Cost for operation, 
maintenance, and care of the locks for this FY was $4,796,432 
which included $81,554 for extended season operation and 
maintenance and $90,397 for operation and maintenance of the 
Gatelifter PAUL BUNYAN. 
Powerhouse and equipment: Two hydroelectric powerhouses 
were operated and maintained at a cost of $856,035 during the 
FY which includes a deducation of $35,048 for interdepartmental 
electricity sold but not paid for. 
Other operation and care items: Building and grounds were 
operated and maintained, condition surveys, operation studies, 
real estate, environmental studies, miscellaneous inspections and 
reports were performed at a cost of $898,224 which includes a 
custodial, snow removal and grounds upkeep contract for 
$262,507. Security measures were performed at a cost of 
$606,625 which included a service contract for $565,673. 
Janitorial service of the facilities was done by a contract at a cost 
of $52,097. A study on winter and extended navigation season, 
ice measurements, and weather monitoring was performed at a 
cost of $429,805. The Soo Harbor ice boom was installed and 
removed at a cost of $33,083. Work was done on the Compensating 
Gates at a cost of $167,321. 
Channels and canals: St. Marys River channels and canal approach 
depths were surveyed by sweeping. Removal of shoals 
in the St. Marys River channels and canal approaches was accomplished 
by hired labor with U.S. Derrickboats NICOLET and 
HARVEY at a cost of $1,009,651 including engineering and 
design. A total of $125,279 has been expended this FY in 
operating and update of an electronic survey sweeping system. 
Other miscellaneous items: A contract was awarded for repair 
of the Davis Lock Dewatering Gates in the amount of $542,300. 
No funds were expended on this contract this FY. Engineering 
and design in connection with the contract cost $63,801. A contract 
was awarded and completed for sandblasting the Davis Lock 
and Administrative Buildings at a cost of $28,860. Engineering 
and design, supervision and administration in connection with 
this contract cost $13,258. Engineering and design was performed 
on the repairs to the rock cut at a cost of $23,093. Engineering 
and design for the master plan for the facility was performed at 
a cost of $95,844. Other miscellaneous engineering and design, 
supervision and administration cost $124,636. 
Recreational facilities: Information center, comfort stations, 
park fountain, observation and overlook platforms were maintained 
at a cost of $172,870 which included a janitorial contract 
for the Information Center at a cost of $25,446. Guide uniforms 
at the Information Center were purchased at a cost of $597. 
Visitors entering the Soo Locks Information Center numbered 
685,601. Visitors to the observation platforms overlooking the 
locks numbered 584,139. Total visitors to the Soo Locks park 
was 794,423. A grand total of 1,067,574 people visited the Soo 
Locks. Total project costs in FY 87 amounted to $9,497,511. 
Project in effect prior to modification of March 21, 1956, is 
complete and work authorized by 1956 modification to provide 
a safe draft of 25.5 feet for both upbound and downbound traffic 
is also complete. Public Works Acceleration Funds used for 
maintenance were $118,000. Total costs to end of FY were 
$160,657,070 for new work and $185,522,168 for maintenance, 
for a grand total of $346,179,238. 
56. SAUGATUCK HARBOR AND 
KALAMAZOO RIVER, MI 
Location. Harbor is on east shore of Lake Michigan, 90 miles 
northeasterly from Chicago, IL, and 22 miles northerly from 
South Haven, MI. (See NOAA Nautical Chart 14906.) 
Previous project. For details see page 1947 of Annual Report 
for 1915, and page 1475 of Annual Report for 1938. 
Existing project. Entrance channel protected by parallel piers 
at mouth of Kalamazoo River and a river channel to Village of 
Saugatuck, MI. Project depths: 16 feet in entrance channel, 14 
feet in river channel. Additional details on page 1456, 1962 Annual 
Report. (See Table 31-B for authorizing legislation.) 
Local cooperation. None required. 
Terminal facilities. At Village of Saugatuck, MI, there are 
several landing places for recreational craft and one for small 
commercial vessels. At Village of Douglas, MI, there is a landing 
pier. Facilities are considered adequate for present traffic. 
Operations during fiscal year. Maintenance: Condition 
surveys, safety and environmental studies, inspections and reports 
were performed by Government forces at a cost of $26,250. 
Existing project was completed in 1903. Total costs to end of 
FY were $3,392,907 of which $364,527 was for new work and 
$3,028,380 for maintenance. 
57. SAXON HARBOR, WI 
Location. On south shore of Lake Superior in Wisconsin at 
mouth of Oronto Creek, 27 miles southeast of harbor at Bayfield, 
WI, and 21 miles westerly of harbor at Black River, MI; 99 miles 
east of Duluth-Superior Harbor and 60 miles west of Ontonagon 
Harbor, MI. (See NOAA Nautical Chart 14965.) 
Previous project. For details see page 1254 of Annual Report 
for 1962. 
Existing project. Provides for east and west breakwaters, an 
outer channel 10 feet deep, an inner basin and side channel 8 
feet deep, and diversion of Oronto Creek to Parkers Creek by 
three short reaches of channel excavation and a levee. For detailed 
dimensions of features see page 1025 of Annual Report for 1965. 
(See Table 31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
31-22

DETROIT, MI DISTRICT 
Terminal facilities. One wharf 300 feet long on east side of 
present harbor basin constructed by local interests. 
Operations during fiscal year. Maintenance: Condition 
surveys, were performed by Government forces at a cost of 
$2,434. 
The project was completed in March 1968. A reconnaissance 
report was completed in August 1971 concerning erosion of the 
shoreline west of the harbor. A detailed project report is being 
prepared to develop an acceptable plan for mitigation measures. 
Total cost of existing project to end of FY is $1,562,606. (Includes 
$50,193 Contributed Funds.) 
58. SEBEWAING RIVER, MI 
Location. At mouth of Sebewaing River on south shore of 
Saginaw Bay about 10 miles south of Bay Port, MI. (See NOAA 
Nautical Chart 14863.) 
Previous project. For details see page 1007 of Annual Report 
for 1912. 
Existing project. Provides for an entrance channel 8 feet deep, 
100 feet wide, and about 15,000 feet long in Saginaw Bay. (See 
Table 31-B for authorizing legislation.) 
Terminal facilities. A number of small wharves used by fishing 
vessels and other light-draft craft are along the river. Facilities 
are considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, miscellaneous inspections and reports were performed 
by Government forces at a cost of $14,826. A contract for repair 
of diked disposal facility awarded this FY is 30% complete at 
a cost of $49,297. Engineering and design for diked disposal 
maintenance cost $44,041. Real estate, supervision and administration 
cost $3,353. 
Existing project was completed in 1903. Total costs to end of 
FY were $2,436,523, of which $35,573 was for new work and 
$2,400,950 for maintenance. 
59. SHEBOYGAN HARBOR, WI 
Location. On west shore of Lake Michigan about 26 miles 
south of Manitowoc and about 55 miles north of Milwaukee, WI. 
(See NOAA Nautical Chart 14922.) 
Previous project. See page 1381 of Annual Report for 1962. 
Existing project. See Chicago District Annual Report for 1979, 
Table 30-C, page 30-27. 
For detailed description see page 1230, Annual Report for 
1963. New Work for project as completed cost $648,271, exclusive 
of amounts expended on previous projects. (See Table 
31-B for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Three wharves for handling coal, 
petroleum products and miscellaneous commodities. City provided 
a public wharf. Facilities considered adequate for existing 
commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, inspections and reports were performed 
by Government forces at a cost of $28,584. Minor repairs 
to the breakwater were performed by hired labor at a cost of 
$1,197. A contract for maintenance dredging was awarded and 
completed this FY at a cost of $176,999 removing 24,303 cubic 
yards of material. Engineering, design, surveys, supervision and 
administration cost $23,742. Engineering and design for revetment 
repair cost $701. Engineering and design for maintenance 
dredging clean material to be performed by contract next FY cost 
$552. Engineering and design for dike disposal site selection continued 
at a cost of $19,857. 
Existing project was completed in 1904. Construction of north 
breakwater was commenced in October 1913 and completed in 
October 1915. Dredging entrance channel to existing project depth 
was commenced in June and completed in July 1938. Work on 
1954 modification was completed in December 1956. Piers and 
breakwaters are in generally good condition. Inner 260 feet of 
south pier was replaced with a revetment by private interests under 
permit granted July 16, 1931, by the Secretary of War. Piers, 
therefore, are maintained only for a length of about 2,490 feet. 
Sheboygan River is navigable about 2.4 miles above its mouth 
for craft drawing not more than 2 feet. Costs of existing project 
to end of FY are $5,969,598 for maintenance, $609,028 for 
rehabilitation, and $1,136,088 for new work; a total of 
$7,714,714. 
60. SOUTH HAVEN HARBOR, MI 
Location. On east shore of Lake Michigan, 77 miles northeasterly 
from Chicago, IL, and 24 miles northerly from St. 
Joseph, MI. (See NOAA Nautical Chart 14906.) 
Previous project. For details see page 1947 of Annual Report 
for 1915, and page 1473 of Annual Report for 1938. 
Existing project. An entrance channel protected by parallel 
piers and revetments at mouth of Black River, a river channel 
and a turning basin. Project depths are 21 feet in entrance channel 
and 19 feet in river channel and turning basin. For additional 
details see page 1455 of Annual Report for 1962. (See Table 31-B 
for authorizing legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. Several wharves for handling coal, 
building materials, woodpulp, fish, and miscellaneous commodities 
will have warehouses. Facilities satisfy current commerce 
requirements. 
Operations during fiscal year. Maintenance: Condition 
surveys, miscellaneous inspections and reports were performed 
by Government forces at a cost of $27,068. Repairs to north revetment 
and south pier were performed using the Cranebarge 
MANITOWOC at a cost of $125,225. Hired labor cost for 
maintenance of safety features was $5,608. Engineering and 
design for major repairs to the north and south Piers was continued 
at a cost of $32,947. Supervision and administration cost 
$3,530. Environmental studies and monitoring in conjunction with 
Section 111 was performed at a cost of $3,198. 
Existing project was completed in 1960. Project now being 
maintained to 14-foot and 12-foot depths, respectively, in lieu 
of the 21 feet and 19 feet authorized, which is adequate for current 
usage. For additional details on completion of existing project 
see page 1456 of Annual Report for 1962. Total costs for 
existing project to the end of FY were $7,456,418, of which 
$984,426 was for new work, $4,839,916 for maintenance and 
$1,632,076 for rehabilitation. 
31-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
61. STURGEON BAY AND LAKE 
MICHIGAN SHIP CANAL, WI 
Location. On west shore of Lake Michigan about 52 miles 
northeast of Green Bay and about 128 miles north of Milwaukee, 
WI. (See NOAA Nautical Chart 14919.) 
Previous projects. See page 1373 of Annual Report for 1962. 
Existing project. See Chicago District Annual Report for 1979, 
Table 31-C, page 30-27. For detailed description, see page 1223, 
Annual Report for 1963. (See Table 31-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. As the canal and connecting channel is 
a through waterway, only terminal facilities are in City of 
Sturgeon Bay, 4 miles from west end of revetted portion of canal. 
These facilities consist of two wharves for handling coal, 
petroleum products and miscellaneous commodities and four shipbuilding 
yards. City of Sturgeon Bay provided a public wharf 
about 5 miles northwesterly from City of Sturgeon Bay. Two major 
shipyards are located in Sturgeon Bay where repair facilities 
are available including dry docks, marine railways and hoists. 
Facilities are considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, miscellaneous inspections and 
reports were performed by Government forces at a cost of 
$30,296. Breakwater repairs were performed by hired labor at 
a cost of $15,797. Engineering and design for confined disposal 
facility continued at a cost of $69,979. Other engineering, design, 
supervision and administration cost $5,086. 
Total cost of existing project to end of FY is $1,059,722 for 
new work, $7,526,257 for maintenance and $884,899 for 
rehabilitation: a total of $9,470,878. In addition, $235,940 was 
expended between April 25, 1893, and June 30, 1917, on 
operating and care of works of improvements under provision 
of permanent indefinite appropriations for such purposes. 
62. TWO HARBORS, MN 
Location. Harbor is on north shore of Lake Superior, 27 miles 
northeasterly from Duluth, MN. (See NOAA Nautical Chart 
14966.) 
Existing project. Narrowing natural entrance by construction 
of two breakwaters, 1,628 and 900 feet long, from eastern and 
western points of bay, respectively; and dredging a maneuvering 
area on north side of harbor to 28 and 30 feet deep. A walkway 
on east breakwater is provided for public recreational use. For 
details see page 1026 of Annual Report for 1965. Dredging to 
deepen areas along easterly and northerly edges of channel was 
completed in 1980. This portion of project was reclassified from 
the "inactive" to "active" category in 1973. (See Table 31-B 
for authorizing legislation.) 
Local cooperation. Fully complied with. A section 221 local 
cooperation agreement was entered into with the city of Two Harbors 
on August 14, 1978. 
Terminal facilities. No publicly owned wharves. Three ore 
docks, tug wharf, an unused coal dock, and merchandise wharf 
are privately owned. Facilities considered adequate for existing 
commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys were performed by Government forces at a cost of 
$7,939. Engineering and design for repair to W. Pier-Section 
C was performed at a cost of $5,377. 
The existing project is complete. Total cost to end of FY was 
$4,170,710 for new work and $1,918,508 for maintenance, a total 
of $6,089,218. 
63. TWO RIVERS HARBOR, WI 
Location. On west shore of Lake Michigan about 82 miles 
north of Milwaukee and about 101 miles from Green Bay, WI, 
via Sturgeon Bay Canal. (See NOAA Nautical Chart 14903.) 
Previous projects. See page 1377, Annual Report for 1962. 
Existing project. See Chicago District Annual Report for 1979, 
Table 30-C, page 30-28. 
For detailed description see page 1226 of Annual Report for 
1963. Completed project cost $147,463, exclusive of the amount 
expended on previous projects. The 1935 River and Harbor Act 
portion of project is considered inactive. Estimated cost of this 
portion (1954) is $14,000. (See Table 31-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. A coal wharf and several fishing wharves. 
City provided a wharf for receipt of petroleum products and public 
use. Facilities considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, miscellaneous inspections and 
reports were performed by Government forces at a cost of 
$14,052. Safety maintenance was performed by hired labor at 
a cost of $947. Supervision and administration cost $446. 
Existing project is complete except for inactive portion of project 
which consists of dredging a 10-foot width along east side 
of lakeward portion of entrance channel between the piers. This 
dredging was omitted to avoid removal of necessary riprap along 
entrance piers. Present width of channel is considered adequate 
for present and reasonably prospective commerce. South pier was 
completed in 1883 and is in generally good condition. North pier 
was completed in 1908. North revetment, completed in 1917, 
was rebuilt in May to August 1962. Dredging entrance channel 
and inner basin to existing project depth was commenced in March 
and substantially completed in May 1937. Total costs of existing 
project were $360,320 for new work, $6,576,826 for 
maintenance, and $58,057 for minor rehabilitation, for a total 
of $6,995,203. 
64. WHITE LAKE HARBOR, MI 
Location. On east shore of Lake Michigan 120 miles northeasterly 
from Chicago, IL, and 45 miles southerly from 
Ludington, MI. (See NOAA Nautical Chart 14935.) 
Existing project. Parallel piers, revetments, and a'channel 16 
feet deep, 200 feet wide, 1,950 feet long, extending from Lake 
Michigan to White Lake. For additional details see page 1465 
of Annual Report for 1962. (See Table 31-B for authorizing 
legislation.) 
Local cooperation. None required. 
Terminal facilities. A privately owned chemical shipping dock 
on north side of lake about 3 miles from inner end of revetted 
entrance channel. Across lake, at Village of Whitehall, there are 
several installations serving light draft vessels. These terminals 
satisfy present recreational and commercial traffic requirements. 
31-24

DETROIT, MI DISTRICT 
Operations during fiscal year. Maintenance: Condition 
surveys, environmental studies, miscellaneous inspections and 
reports were performed by Government forces at a cost of 
$17,809. Repairs to the east and west piers were performed by 
hired labor using the Cranebarge MANITOWOC at a cost of 
$61,880. Minor safety maintenance performed by hired labor cost 
$7,076. Engineering, design, supervision and administration cost 
$5,107. Condition surveys, environmental studies, monitoring, 
inspections and reports in connection with Section 111 of P.L. 
90-483 were performed at a cost of $51,538. Engineering, supervision 
and administration cost $1,945. 
Existing project was completed in 1908. Stone was placed on 
the north and south revetments in FY 1972. The structures are 
in generally good condition. Project now being maintained to 
14-foot depth authorized, which is adequate for current usage. 
Total cost to end of FY is $3,400,897, of which $457,563 was 
for new work and $2,943,334 for maintenance. 
65. RECONNAISSANCE AND 
CONDITION SURVEYS 
See Table 31-J. 
66. OTHER AUTHORIZED 
NAVIGATION PROJECTS 
See Table 31-C. 
67. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Section 107. Public Law 
86-645 (pre-authorization.) Physical and financial close-out of 
the study authority was accomplished on the terminated projects 
at Bayfield, WI ($2,410), Douglas County, WI ($467), Kenosha 
Harbor, WI ($1,072), and Two Harbors, MN ($548). Reimbursement 
of an unfavorable Initial Appraisal Report was completed 
for the Kenosha Harbor, WI, breakwater modification ($1,200). 
Beach Erosion Control 
68. AUTHORIZED BEACH EROSION 
CONTROL PROJECTS 
A beach erosion control project is authorized at the Shore of 
Manitowoc County, WI. For last full report see Annual Report 
for 1963 (Berrien County). The project is in the inactive category. 
The project for beach erosion control, Berrien County, MI (St. 
Joseph Shore), authorized by the Flood Control Act of 1958, was 
deauthorized by the Water Resources Development Act of 1986; 
Public Law 99-662 - Nov. 17, 1986, 99th Congress, Title X. (See 
Table 31-G for list of deauthorized projects.) 
69. EMERGENCY SHORE PROTECTION 
Authority for emergency streambank and shoreline protection 
of public works and non-profit public services. (Section 
14 Flood Control Act of 1946, as amended.) 
Baileys Harbor, Union, WI - Reimbursement of an unfavorable 
Initial Appraisal study was completed at a cost of $1,200. 
Bar Lake, MI - A favorable Initial Appraisal Report was completed 
and plans and specifications for protection of 600 feet of 
shoreline adjacent to Lakeshore Road was initiated at a cost of 
$10,179. 
Baraga County, MI - Reimbursement of a favorable Initial Appraisal 
Report was completed at a cost of $7,500. 
Barkers Island, WI - Financial closeout of the project authority 
was completed at a cost of $3,933. 
Bayshore Drive, N. Shoemaker Road, WI - Financial closeout 
of the project authority was completed at a cost of $1,110. 
Bridgeport Charter Township, MI - Construction of streambank 
erosion protection works for the Fayette Street bridge was 
completed on November 25, 1986, and the O&M manual was 
completed in August 1987. FY 1987 costs were $93,372. 
Caseville, MI - Reimbursement of an unfavorable Initial Appraisal 
study was completed at a cost of $3,000. 
Charlevoix Co. East Jordan River, MI - Reimbursement of a 
favorable Initial Appraisal Report was completed at a cost of 
$7,500. 
Elkhart River, Elkhart, IN - Financial closeout of the project 
authority was completed at a cost of $4,322. 
Fair Haven, MI - Reimbursement of a favorable Initial Appraisal 
study was completed at a cost of $7,500. 
Fox Point Village, WI - Reimbursement of an unfavorable Initial 
Appraisal study was completed at a cost of $5,000. 
Gladstone, MI - Reimbursement of an unfavorable Initial Appraisal 
report was completed at a cost of $7,500. 
Glealand & Lincoln Beaches, MI - Reimbursement of an unfavorable 
Initial Appraisal study was completed at a cost of 
$1,300. 
Grand Haven (Power and Light), MI - Reimbursement of an 
unfavorable Initial Appraisal study was completed at a cost of 
$3,000. 
Grand Traverse Bay, MI - Reimbursement of an unfavorable 
Initial Appraisal study was completed at a cost of $1,000. 
Harbor Springs, MI - Reimbursement of a favorable Initial Appraisal 
study was completed at a cost of $7,500. 
Harsens Island, St. Clair, MI - Reimbursement of an unfavorable 
Initial Appraisal study was completed at a cost of 
$1,800. 
Keweenaw Bay, MI - Reimbursement of an unfavorable Initial 
Appraisal study was completed at a cost of $1,900. 
Keweenaw, Eagle River, MI - Reimbursement of an unfavorable 
Initial Appraisal study was completed at a cost of 
$2,000. 
Lake Michigan Shoreline, Grand Haven, MI - Construction of 
shoreline erosion protection works for Harbor Drive was completed 
on November 12, 1986, and the O&M manual was completed 
in August 1987. FY 1987 costs were $151,286 Federal 
and $9,902 non-Federal. 
Lake Michigan Shoreline, Muskegon, MI - A favorable Initial 
Appraisal report was completed and plans and specifications for 
protection of 600 feet of shoreline for the City's water filtration 
plant and Beach Street were initiated at a cost of $7,458. 
Lake Michigan Shoreline, Caledonia, WI - Reimbursement of 
an unfavorable Initial Appraisal report was completed at a cost 
of $3,000. 
31-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Lake Michigan Shoreline, South Milwaukee, WI - A reconnaissance 
study, to determine if there is a Federal interest in providing 
shoreline erosion protection to the outfall pipe of the city's 
Wastewater Treatment Plant, was initiated at a cost of 
$11,855. 
Lake Michigan Shoreline, Whitefish Bay, WI - A reconnaissance 
study, to determine if there is a Federal interest in providing 
shoreline erosion protection to the Water Intake Pumping 
Station, was initiated at a cost of $11,905. 
Lake Michigan Shoreline, Cudahy, WI - Construction of 
shoreline protection works for the city's electric substation and 
pump house was completed on November 13, 1986, and the O&M 
manual was completed in August 1987. FY 1987 costs were 
$55,664. 
Lake Michigan Shoreline, Sturgeon, WI - Reimbursement of 
an unfavorable Initial Appraisal study was completed at a cost 
of $2,000. 
Lake Michigan Shoreline, Cleveland, WI - Construction of 
shoreline protection works for the city's Waste Water Treatment 
Plant was completed on December 11, 1986, and the O&M 
manual was completed in August 1987. FY 1987 costs were 
$88,709. 
Lake Michigan Shoreline, Brevort, MI - Reimbursement of an 
unfavorable Initial Appraisal study was completed at a cost of 
$1,000. 
Lake Superior Shoreline, Marquette, MI - Reimbursement of 
an unfavorable Initial Appraisal report was completed at a cost 
of $6,500. 
Leelanau County, Sutton Bay, MI - Reimbursement of an unfavorable 
Initial Appraisal study was completed at a cost of 
$1,000. 
Madeline Island, Lake Superior, WI - Reimbursement of the 
ongoing unfavorable Initial Appraisal report at a cost of $6,470. 
Manistee, MI - Financial closeout of the project authority was 
completed at a cost of $3,207. 
Marquette County, MI - Reimbursement of an unfavorable Initial 
Appraisal study was completed at a cost of $3,000. 
Marysville, St. Clair River, MI - A favorable Initial Appraisal 
report was completed and plans and specifications for protection 
of 2,200 feet of shoreline adjacent to River Road was initiated 
at a cost of $9,231. 
Memorial Drive, McKinley Park, WI - Reimbursement of the 
ongoing Initial Appraisal study efforts at a cost of $7,500. 
Memorial Drive, Muskegon, MI - Reimbursement of the ongoing 
Initial Appraisal study efforts at a cost of $7,500. 
Memorial Park, Wayne County, MI - Reimbursement of an 
unfavorable Initial Appraisal report was completed at a cost of 
$11,500. 
Menominee, MI - Reimbursement of an unfavorable Initial Appraisal 
study was completed at a cost of $1,000. 
Milwaukee South Shore Park, WI - Reimbursement of the 
ongoing favorable Initial Appraisal report at a cost of $6,993. 
Mosel, WI - Reimbursement of an unfavorable Initial Appraisal 
report was completed at a cost of $11,500. 
Port Sanilac, MI - Reimbursement of an unfavorable Initial Appraisal 
study was completed at a cost of $2,938. 
Scenic Drive, Duck Lake, MI - A favorable Initial Appraisal 
report was completed and plans and specifications for protection 
of 1,500 feet of shoreline adjacent to Scenic Drive was initiated 
at a cost of $12,478. 
Sheboygan, WI - Reimbursement of the ongoing Initial Appraisal 
report at a cost of $6,499. 
Shoreham, MI - Reimbursement of an unfavorable Initial Appraisal 
study was completed at a cost of $3,000. 
Silver City, MI - Reimbursement of the ongoing Initial Appraisal 
report at a cost of $4,500. 
Tawas City, MI - Reimbursement of the Initial Appraisal report 
and termination of Plans and Specification work due to withdrawal 
of project sponsorship by the State, Department of Transportation. 
FY 1987 costs were $7,700. 
Traverse City, MI - Reimbursement of a favorable Initial Appraisal 
report was completed at a cost of $7,500. 
70. BEACH EROSION WORK UNDER 
SPECIAL AUTHORIZATION 
Beach erosion activities pursuant to Section 103 of the 1962 
River and Harbor Act. Physical and financial closeout of the 
study authority was accomplished on the terminated projects at 
Escanaba, MI (-$2,000) and Ontonagon Harbor, MI ($5,719). 
71. MITIGATION OF SHORE DAMAGES 
Mitigation of Shore Damages pursuant to Section 111 of the 
River and Harbor Act of 1968. Report efforts were continued 
on Algoma, WI (-$308), and Sturgeon Bay, WI ($1,945). Coordination 
efforts continued on Grand Traverse Harbor, MI 
(-$4,738). Reimbursement of unfavorable Initial Appraisal 
Reports were completed for Ontonagon Harbor, MI ($7,000) and 
Superior, WI. ($6,000) while reimbursement of a favorable Initial 
Appraisal Report was completed for Cornucopia Harbor, WI 
($7,500). 
Flood Control 
72. KAWKAWLIN RIVER, MI 
Location. River drains an irregularly shaped area of about 220 
square miles in Bay, Gladwin, Midland, and Saginaw Counties 
in east-central Michigan and discharges into Saginaw Bay 2 miles 
northwest of Saginaw River. (See Geological Survey Bay City 
quadrangle and NOAA Nautical Charts 14867 and 14863.) 
Existing project. Provides for deepening about 1.8 miles of 
river channel between the river mouth and Euclid Street Bridge; 
altering Detroit and Mackinac Railway Bridge by addition of two 
45.9-foot spans; protecting by riprapping the channel bottom 
through Euclid Street Bridge, existing piers at Henry Street Bridge 
and Detroit and Mackinac Railway Bridge; and a number of utility 
relocations. The Water Resources Development Act (W.R.D.A.) 
of 1986, dated Nov. 17, 1986, Section 837, modified the flood 
control project on the Kawkawlin River, MI, that was authorized 
by Section 205 of the Flood Control Act of 1948, to provide 
that the Federal share of the cost of operation and maintenance 
of the project shall be 50 percent. (See Table 31-B for authorizing 
legislation.) 
73. PAW PAW LAKE, MI 
Location. Approximately 10 miles north of St. Joseph/Benton 
Harbor on the Paw Paw River, in Berrien County. 
31-26

DETROIT, MI DISTRICT 
Existing Project. Accomplished under the authority of Section 
205 of the 1948 Flood Control Act, the project provides for: 
a gated control structure at the Paw Paw Lake outlet to the Paw 
Paw River; a 1,722 foot long, 72-inch reinforced concrete 
drainage from the southeast corner of the lake to the Paw Paw 
River; entrance and exit structures to improve hydraulic efficiency 
and provide protection to the pipe from floating debris; and two 
small levees to alleviate induced downstream damages. The project 
was completed in February 1987. (See Table 3.1-B for 
authorizing legislation.) 
Local Cooperation. Fully complied with. 
Operations during fiscal year. New Work: The contract for 
flood damage reduction at Paw Paw Lake, MI, which was awarded 
in FY 85, was completed in February 1987, with a current 
FY cost of $263,233. 
Total costs to end of FY were $3,577,044. 
74. RED RUN DRAIN-LOWER CLINTON 
RIVER, MI 
Location. The Clinton River basin has an area of 760 square 
miles and includes part of Macomb, Oakland, St. Clair and 
Lapeer Counties in the Southeastern portion of the lower peninsula 
of Michigan. The project itself is located in the southeastern 
section of the basin. 
Existing project. Provides for abandonment of the upper 2 
miles of the Red Run Drain in Oakland County and for enlarging 
and paving the Red Run Drain from Dequindre Road on the 
west downstream to the Main Branch, Clinton River, a distance 
of approximately 8 /2 miles. Bottom widths of the channel would 
vary from 70 to 240 feet. The Main Branch, Clinton River would 
be widened, deepened and straightened for a distance of about 
4 '1 miles. The channel width would vary from 180 to 200 feet 
and adjacent lands would be maintained as a floodway with a 
width of 500 feet. The authorized plan provides for a rectangular 
concrete-lined channel below this point, varying in width from 
180 to 210 feet, to the existing Clinton River Cut-Off Canal, a 
distance of about 2 miles. The Cut-Off Canal would consist of 
a rectangular channel with concrete bottom 210 feet wide and 
steel sheet pile walls in the upper 1 V2 miles and a trapezoidal 
concrete-lined channel with a 170-foot bottom width and 75-foot 
wide benches placed on each bank over the lower mile of the 
Canal to Lake St. Clair. The authorized plan would provide protection 
for surrounding urban areas against rainfall and flood having 
a 1.0 percent chance of occurrence under anticipated urbanized 
basin conditions in the year 2000. 
Post authorization studies revealed additional capacity in the 
existing drainage system and the degree of potential flooding 
should not be as great as had been assumed. Also, a detailed flood 
damage assessment comparing the authorized plan with the existing 
system and several alternatives determined the project could 
not be economically justified. Subsequently this project was 
deauthorized by the Water Resources Development Act of 1986; 
Public Law 99-662 - Nov. 17, 1986, 99th Congress, Title X. (See 
Table 31-G for list of deauthorized projects). 
75. SAGINAW RIVER, MI 
Location. Saginaw River basin including its tributaries, Tittabawasee, 
Shiawassee, Flint and Cass Rivers, drains an area 
of 6,260 square miles in the east central part of Michigan and 
empties into Saginaw Bay, an arm of Lake Huron. Bay City, near 
mouth of river, and Saginaw, 22 miles upsteam from mouth, are 
on Federally improved deep-draft Saginaw River navigation channel 
(See Saginaw and Flint Geological quadrangles and NOAA 
Nautical Chart 14867). 
Existing project. Provides for improvements in Saginaw River 
Basin for flood control and other purposes: (a) at Sanilac Flats, 
MI, Middle Branch and South Branch, Cass River, to provide 
for major drainage improvements by channel improvements on 
Middle and South Branches, including a short reach of East 
Branch. This feature of the project for flood control, Saginaw 
River, MI, authorized by the Flood Control Act of 1958, was 
deauthorized by the Water Resources Development Act of 1986; 
Public Law 99-662 - Nov. 17, 1986, 99th Congress, Title X; (b) 
at Vassar on Cass River, to provide for flood protection of areas 
on north and south sides of river by channel improvement, levee 
construction floodwalls, modification of Moore Drain, and related 
work at an estimated U.S. cost (Oct. 1984) of $8,620,000 and 
non-Federal cost of $579,000 for construction; (c) at Frankenmuth 
on Cass River, to provide for flood protection of areas on 
north side of river by channel improvement, levee construction, 
and related work, at an estimated U.S. cost (July 1974) of 
$410,900 for construction; (d) at Flint on Flint River, to provide 
for flood protection of areas on both sides of main stem of Flint 
River and its tributaries, Swartz and Thread Creeks by channel 
improvement, bridge alterations, floodwall and levee construction, 
and related work, at an estimated U.S. cost (Oct. 1984) of 
$18,251,600 and non-Federal cost of $2,580,000 for construction; 
provided local interests contribute in cash 1 percent of first 
cost of project, exclusive of costs of rights-of-ways; (e) at Corunna 
on Shiawassee River, to provide for flood protection by 
channel improvement, levee construction, and related work. This 
feature of the project for flood control, Saginaw River, MI, 
authorized by the Flood Control Act of 1958, was deauthorized 
by the Water Resource Development Act of 1986; Public Law 
99-662 - Nov. 17, 1986, 99th Congress, Title X; (f) at Owosso 
on Shiawassee River, to provide for flood protection by channel 
improvement. This feature of the project for flood control, 
Saginaw River, MI, authorized by the Flood Control Act of 1958, 
was deauthorized by the Water Resources Development Act of 
1986; Public Law 99-662 - Nov. 17, 1986, 99th Congress, Title 
X; (g) at Midland on Tittabawassee River, to provide for flood 
protection through non-structural (permanent evacuation) 
measures at an estimated U.S. cost (Apr. 1982) of $5,125,000 
and non-Federal cost of $1,611,500 for implementation; however, 
project was reclassified to the "inactive" category on December 
15, 1982; (h) at Shiawassee Flats along lower reaches of the four 
principal tributaries of Saginaw River, to provide for flood protection, 
including fish and wildlife areas; by channel.improvement, 
levees, lateral reservoirs with control structures and related 
work at an estimated U.S. cost (Oct. 1984) of $23,417,500 
Federal, and a non-Federal cost of $2,705,000 which includes 
a cash contribution of $1,237,000; provided local interests contribute 
in cash 5 percent of cost of rights-of-way for flood control 
and other work required as local cooperation, and furnish 
one-half of land required for fish and wildlife areas; provided 
that the Federal allocation for conservation does not exceed 
amount obtained by taking 28 percent of project cost for 
Shiawassee Flats unit and subtracting therefrom one-half cost of 
lands for conservation; and provided further that before starting 
works for flood control to Shiawassee Flats, Chief of Engineers 
31-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
and Director, Fish and Wildlife Service, prepare a plan mutually 
acceptable to Secretary of the Army and Secretary of the Interior 
for operation of fish and wildlife areas to required degree 
of controlled storage of flood-waters while preserving the maximum 
fish and wildlife benefits. Total estimated cost for new 
work, for active portion (1984) is $50,700,000 Federal and 
$1,421,000 to be contributed by local interests. Total estimated 
cost (1984) to local interests is $5,870,000. 
Local cooperation. Responsible local interests must make cash 
contributions as called for above; furnish lands, and rights-ofway, 
including removal of buildings, for construction; hold the 
United States free from damage; maintain and operate all works 
after completion; establish and enforce regulations designed to 
prevent encroachments in improved channels; and bear expense 
of constructing highway relocations and highway bridges, alter 
bridge approaches and existing highway bridge approaches and 
existing highway bridges (except underpinning and bridge raising), 
and alter utilities. Required assurances for Flint River at 
Flint were furnished by city of Flint and accepted by the United 
States on November 23, 1962. Estimated required cash contribution 
for Flint ($56,000) was furnished February 20, 1963. An 
additional $117,000 was furnished by the City to cover increased 
construction costs. Required assurances for Cass River at 
Frankenmuth were accepted on September 8, 1964. All necessary 
lands, easements, and rights-of-way have been provided. The 
Midland City Council adopted a resolution on June 7, 1982 declaring 
its intent not to sponsor the Flood Control project on the Tittabawassee 
River at Midland. The Vassar City Council, in a letter 
dated January 26, 1982, indicated a willingness and capability 
to provide the assurances of local cooperation for the Vassar 
Flood Control Project. Saginaw County, in a resolution dated 
August 11, 1982, indicated a willingness and capability to provide 
the assurances of local cooperation for the Shiawassee Flats 
Flood Control Project. 
Operations during fiscal year. New Work: Shiawassee: Work 
on preparing a General Design Memorandum, initiated in FY 
83, :continued in FY 87. Total cost for Shiawassee this FY is 
$1,580. 
Flint: Investigation of claims for contract completed in FY 80 
was continued at a cost of $43,348. 
The Frankenmuth and Flint portions of the project are complete. 
Total FY 87 costs for this project were $44,928. 
76. SEBEWAING, SEBEWAING RIVER, MI 
Location. Sebewaing River drains an area of 105 square miles 
in Huron and Tuscola Counties on the westerly side of Thumb 
area of Lower Peninsula of Michigan and discharges into Saginaw 
Bay, an arm of Lake Huron, 20 miles northeast from mouth of 
Saginaw River. Village of Sebewaing is near mouth of River. 
(See NOAA Nautical Chart 14863.) 
Existing project. Enlarging present channel of Sebewaing 
River through Village of Sebewaing, MI, to a capacity of 7,500 
cubic feet per second from junction of Columbia and State drains 
to a point 4,500 feet lakeward from railroad bridge near mouth; 
altering railroad bridge and three highway bridges to permit free 
passage of ice; and removal of present dike on south side of channel 
lakeward from railroad bridge. Project is designed to provide 
protection for Village ofSebewaing from floods with a frequency 
of once in 15 years and with a magnitude greater than 
the maximum flood of record. (See Table 31-B for authorizing 
legislation.) 
Local cooperation. Complied with except for furnishing easements 
and rights-of-way for removal of remaining portion of dike 
on south side of channel lakeward from railroad bridge. 
Operations during fiscal year. Maintenance: Condition 
surveys, inspections and reports were performed by Government 
forces at a cost of $8,000. Total costs to the end of the FY were 
$762,286. 
77. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
NAME OF PROJECT DATE OF INSPECTION 
Battle Creek, Kalamazoo River, MI Jul 1987 
Burr Oak, Prairie River, MI Aug 1987 
Estral Beach, Lake Erie, MI Aug 1987 
Flint, Flint River, MI June 1987 
Fort Wayne Mechanic St. Dike, St. Marys 
River, IN Sep 1987 
Frankenmuth, Cass River, MI July 1987 
Kawkawlin, Kawkawlin River, MI July 1987 
Mount Clemens Spillway and Cutoff Canal, 
Clinton River, MI May 1987 
Red Run, Clinton River, MI May 1987 
Rouge River, MI May 1987 
Sebewaing, Sebewaing River, MI Aug 1987 
FY 87 costs were $148,584. Total costs to end of FY were 
$1,307,162. 
78. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See Table 31-E. 
79. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency Flood Control Activities, Flood Fighting (Public 
Law 84-99 and P.L. 93-288 and Antecedent Legislation). 
Project and Location Fiscal Year Costs 
to September 30, 1987 
Disaster Preparedness 
Emergency Operations 
Rehabilitation 
Advance Measures 
Advance Measures (Contributed Funds) 
$ 316,723 
$ 328,016 
$ 61,136 
$ 3,828,853 
$ 167,127 
Flood Control activities pursuant to Section 205 of the 1948 
Flood Control Act. The Draft Definite Project Report was continued 
on the Ontonagon, MI project ($42,635). The Initial Appraisal 
Report reimbursement was completed and the Reconnaissance 
Report was initiated for Cedar Creek, Auburn, IN 
($25,866). A reconnaissance report was initiated to determine 
if there is a Federal interest in participating in a flood control 
project at Kenosha in the lower Pike River, WI ($1,283). Negative 
appraisal reports were completed for Dunn's Bridge, Kankakee, 
IN ($7,500), Gilkey Creek, Flint, MI ($6,000) and Tuscarora 
Township, Sturgeon River, MI ($5,000). 
Flood Control activities pursuant to Section 208 of the 1954 
Flood Control Act. Termination of the LaGrange County, IN 
project due to completion of the proposed works by local interests 
($5,005). Completion of the O&M Manual and financial closeout 
of the Maple River, MI project ($1,000). Reconnaissance report 
efforts were initiated on the North Fond Du Lac project to deter- 
31-28

DETROIT, MI DISTRICT 
mine if there is Federal interest in improving Supple, Mosher 
and Anderson Creeks to reduce flood damages. 
Aquatic Plant Control activities pursuant to Section 302 of 
the River and Harbor Act of 1965 (PL 89-298). An Aquatic 
plant control reconnaissance study was initiated for Hess Lake 
within Newaygo County, MI. Funds in the amount of $1,998 were 
expended in FY 87. 
80. SURVEILLANCE OF NORTHERN 
BOUNDARY WATERS 
Field Operations. The following field operations, which were 
complemented by office activities in support of basic missions, 
were conducted during the report period: In support of the International 
St. Lawrence River Board of Control, the District conducted 
velocity and flow distribution measurements on the St. 
Lawrence River during FY 87, a period of critically high outflows 
from Lake Ontario. These measurements are being used for the 
development and calibration of mathematical models by the 
Waterways Experiment Station (WES) to evaluate the feasibility 
of placing remedial measures in the area to mitigate navigation 
hazards. Discharge measurements were also conducted in the 
Niagara River to check the verification of stage-discharge relationships 
for the Buffalo and Fort Erie gages, to investigate the 
effect on flows of manipulating the Grass Island Pool, and to support 
mathematical modeling activities. Additional field 
measurements are scheduled on the St. Marys, St. Lawrence, 
Niagara, St. Clair, and Detroit Rivers during FY 88. 
During the winter months, the District monitors the presence 
of ice in the St. Marys, St. Clair, and Detroit Rivers as an ongoing 
mission. Water levels are monitored continuously at key gages 
in these rivers for automated updating of hydrographs used for 
detecting possible ice jams and the associated potential for 
flooding. This information can be used to provide advance warning 
to area residents and other governmental agencies (in support 
of respective Flood Alert Plans). The monitoring activity 
is constantly being updated to utilize new technologies for relaying 
data via satellites. This provides water level data in the District 
Office within minutes of data collection. During the winter of 
1986-87, severe ice retardation occurred on the lower St. Clair 
River; the monitoring of ice-induced flooding was enhanced by 
the use of automated data collection equipment. 
International Activities. The following activities were conducted 
specifically for the International Joint Commission (IJC) 
Boards and Committees: 
Members of the Detroit District staff attended the spring and 
fall semi-annual appearances of the International Great Lakes 
Boards before the Commission in Washington, D.C. and Ottawa, 
Ontario, respectively. 
As a result of the record high lake levels, changed economic 
conditions and improved analytical techniques, the Governments 
of the United States and Canada issued the IJC a Reference, on 
August 1, 1986, requesting a new Great Lakes level regulation 
study. The IJC will investigate appropriate methods to alleviate 
problems associated with fluctuating water levels and to assess 
the viability of further lake level regulation. 
Initially under this study, the IJC formed eight task groups to 
undertake a technical evaluation of measures which could be implemented 
within approximately one year to reduce water levels. 
Upon completion of these evaluations, each group then provided 
a report on their findings, to the IJC, which subsequently cornmpiled 
a combined interim report. Because of the complexity of 
the issues to be addressed during the study, the bulk of the work 
has been assigned to functional study groups, each with a responsibility 
to play a lead role with respect to a group of related tasks. 
The work activities of each group, in turn, will frequently require 
integration and close collaboration with work activities of 
the other groups. 
In addressing potential measures for alleviating the adverse effects 
of water level fluctuations, the study groups will identify 
and provide advice on crisis intervention, intermediate measures 
and long-term considerations, building on, as appropriate, the 
work of the Commission's Task Force. Once the studies are complete, 
the governments should be in a better position to make a 
determination regarding management of the Great Lakes. 
a. International Lake Superior Board of Control. The 
Detroit District Engineer is the United States Regulation 
Representative of the Board of Control. In support of the U.S. 
Section of the Board, the District provided monthly Lake Superior 
outflow recommendations based upon a review of the hydrologic 
factors which influence the future regulation of Lake Superior. 
These recommendations were based on the use of probability 
forecasts of water supplies routed through the lakes, rendering 
outflows under Plan 1977, the currently approved operating rule. 
During the May to August 1985 period, outflows from Lake 
Superior were reduced below those specified under Regulation 
Plan 1977, to provide a measure of relief to the very high water 
levels occurring downstream on Lakes Michigan-Huron, St. Clair 
and Erie. However, as the level of Lake Superior began to rise 
towards elevation 602.0 feet, it became necessary to increase the 
outflow from that lake and at the same time to gradually eliminate 
the storage accumulated on Lake Superior. This procedure was 
followed until March 19, 1986, when the IJC directed the Board 
to immediately return the outflows to those specified by Plan 
1977. Through the end of FY 87, there remained 30,000 cfsmonths 
of the emergency storage on Lake Superior, thus raising 
the level of Lake Superior by 0.08 foot while lowering the levels 
of Lakes Michigan-Huron, St. Clair and Erie by 0.03, 0.02 and 
0.02 foot, respectively, in comparison to the levels that would 
have occurred under the strict application of Plan 1977. The Board 
continues to closely monitor lake levels and will advise the Commission 
if and when additional flow changes are warranted. 
In an effort to make improvements upon Plan 1977, the Board 
is presently testing the regulation model with various modifications 
which might better reflect the present conditions while also 
providing further optimization of Plan 1977. 
b. International Niagara Board of Control and International 
Niagara Working Committee. The Chief of the Great Lakes 
Hydraulics and Hydrology Branch is on the U.S. Section of the 
Working Committee. Under the auspices of the International 
Niagara Committee, the Detroit District computes, coordinates 
and publishes, with Canada, the monthly flows in the Niagara 
River. The District also provides direct technical support and consulting 
engineering services to the Board and Committee. During 
FY 87, a series of discharge measurements were made at the 
International Bridge Section for a hydraulic study of Lake Erie 
outflow. Additional measurements are planned at this section in 
FY 88 and FY 90. The District is involved with the verification 
of the rating curves for the Ashland Avenue and American Falls 
gages. As part of the on-going program to periodically verify 
the stage-discharge relationship for these gages, a series of 
measurements are scheduled in FY 88 at the Cableway Section 
31-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
for verification of the Ashland Avenue Rating Curve. Also during 
FY 89, measurements are planned at the American Falls 
Channel Section to check the amount of flow over the American 
Falls. 
c. International St. Lawrence River Board of Control. When 
requested, the Detroit District supported the Buffalo District in 
its activities. In FY 87, the Detroit District conducted flow 
measurements on the St. Lawrence River during periods of 
critically high outflows from lake Ontario. In FY 88, the Detroit 
District plans to conduct an intensive flow measurement program 
in the Copeland Cut reach of the St. Lawrence River to collect 
data to be used as input to existing mathematical models of the 
river and also for proposed physical models. These efforts are 
required to assist the Board in making various regulatory decisions 
during periods of high flow in the St. Lawrence River. A 
drogue survey is scheduled for FY 90 and additional discharge 
measurements in FY 91. 
d. International Great Lakes Diversions and Consumptive 
Uses Study Board. The UC submitted its recommendations, based 
on the Board's report and subsequent public hearings, to the 
governments of the United States and Canada, in a report dated 
January 1985. A former Detroit District Engineer was Chairman 
of the U.S. Section of the Working Committee. Until such time 
as the Board is either dissolved or continued, certain personnel 
within the District continue to hold membership on the Diversions 
and Environmental Evaluation Subcommittees and on the 
Public Involvement Ad Hoc Group. 
e. International Great Lakes Technical Information Network 
Board. The Chief of the Great Lakes Hydraulics and 
Hydrology Branch is the Secretary to the U.S. Section of this 
Board, as well as a member on the Hydraulics and Hydrology 
Committees. The Board completed its study and provided a report 
of its findings and recommendations to the Commission in 
December 1984. In January 1985, the IJC informed the governments 
of the United States and Canada of the findings of the 
Board. Furthermore, the Commission recommended that a committee 
be established to provide an international mechanism for 
institutional coordination between the operational Boards of the 
IJC and agencies making studies, gathering and providing data 
on the Great Lakes System. This Board would assume the functions 
of the "Coordinating Committee on Great Lakes Basic 
Hydraulic and Hydrologic Data." 
Coordinating Committee on Great Lakes Basic Hydraulic 
and Hydrologic Data. The Chief of the Great Lakes Hydraulics 
and Hydrology Branch is the U.S. Secretary to this committee, 
as well as a member of its subcommittees. Operations continued 
pertaining to the coordination of basic hydraulic and hydrologic 
data with Canada. Coordinating Committee reports being worked 
on in the District include one which documents the discharge 
measurements made on the Great Lakes Connecting Channels and 
St. Lawrence River during the period 1900- 1985. Another 
report being worked on documents the flow in the St. Clair and 
Detroit Rivers, 1900 - 1985. Through the auspices of the Coordinating 
Committee, the Corps of Engineers, by 1983, had provided 
funds to Canada, in the amount of $215,000, to aid in completion 
of precise leveling in the International Section of the St. 
Lawrence River. This survey, as well as similar surveys conducted 
in the U.S. by NOAA, are part of a program to update 
the International Great Lakes Datum (IGLD). The new IGLD 
will evolve around the epic year 1980 and is expected to be 
published in FY 88. 
NCD Master Plan for Water Control Data System. During 
FY 87, the District continued in the implementation of the Great 
Lakes Water Control Data System, based upon a Harris-800 
minicomputer and automated gaging stations. The computer collects 
data from the District's data collection platforms (DCP's), 
from dedicated lines to the National Weather Service's telecommunication 
network, and from NOAA/NOS and Canadian water 
level computer systems. The District has 24 DCP's active and 
plans to install as many as 10 additional DCP's in FY 88. 
Great Lakes Information Management. The District has 
developed an automated computer mapping center based upon 
a dedicated image processing system capable of processing 
satellite image data and aerial photography. Besides processing 
remotely sensed data, the system provides capabilities for encoding 
cartographic information to be used for generating multiparameter 
data bases for basin-wide hydrologic models. The 
system provides capabilities for generating high-resolution 
graphics and drafting products. The computer mapping center 
is supporting the District's water control minicomputer in the 
monitoring of snowpack and ice conditions, and will be used in 
FY 88 to monitor lake surface temperatures for input to lake 
evaporation models. The computer mapping center will also be 
used for storing and retrieving information on all of the historic 
District aerial photography archives. 
Hydraulics and Hydrology of the Great Lakes. Studies to 
improve the existing Great Lakes water level forecasting system, 
including investigations into the factors affecting the Great Lakes 
water balance relationship (i.e., runoff, precipitation over water, 
evaporation, ice retardation, etc.) and use of real-time hydrologic 
data were continued by Great Lakes Hydraulics and Hydrology 
Branch staff members. A hydrologically based model is being 
studied and calibrated for the Great Lakes for possible use in 
future forecasts of lake levels and outflows. District personnel 
participated, for the fifth year, in a program to assess water supplies 
on the Lake Superior basin through use of airborne snow 
and soil moisture surveys, and satellite imagery. 
Levels of the Great Lakes. The Great Lakes Hydraulics and 
Hydrology Branch provided technical information and expertise 
regarding recorded lake levels and still water lake level forecasts 
to many interested parties, such as Congressmen, state and local 
officials, news media, navigation and power interests, and concerned 
property owners. Explanation of the water levels was supplied 
to the public in the form of direct answers to numerous inquiries, 
addresses to various civic groups, and interviews with 
news media. The publication of an international (U.S. and 
Canada) forecast of Great Lakes water levels, under the auspicies 
of the Coordinating Committee on Great Lakes Basic Hydraulic 
and Hydrologic Data, was continued during the period. 
Total costs under Surveillance of Northern Boundary Waters 
for FY 87 were $1,278,991. 
General Investigations 
81. SURVEYS 
Fiscal year costs were $44,198 for the navigation study on the 
Great Lakes Connecting Channels and Harbors. Flood Damage 
Prevention studies cost $885,793. A feasibility study at Fort 
Wayne, IN was continued with the completion of the Final 
Feasibility Report and Final Environmental Impact Statement, 
at a cost of $122,419 Federal funds and $117,588 non-Federal 
31-30

DETROIT, MI DISTRICT 
contributed funds. Funds in the amount of $36,698 were spent 
on completing the Ecorse Creek Basin, Wayne County Flood Protection 
Study. In addition, $53,661 were expended in completing 
work efforts on a Summary Report dealing with the overall study 
authority for the Great Lakes, particularly Lake Ontario and Lake 
Erie, of which Ecorse Creek Basin is an Interim study. Continuation 
of planning on the Saginaw River, MI Basin Study was accomplished 
at a cost of $673,014. 
Coordination Studies with Other Agencies includes: 
Special Investigations, $64,917 (includes $45,000 for engineering 
and technical assistance given to local citizens because of high 
lake levels of the Great Lakes). F.E.R.C., $1,162. Soil Conservation 
Service, $1,936; and Planning Assistance to States (Section 
22), $33,975. 
82. PRECONSTRUCTION ENGINEERING 
AND DESIGN 
MONROE HARBOR, MI: 
A Final Survey Report recommending structural modifications 
was completed in February 1980. The report recommendations 
are: to deepen the River Raisin portion of the project to 27 feet; 
to widen to 500 feet and deepen to 28 feet the entrance channel 
from Lake Erie; to provide a new turning basin able to accommodate 
1,000 foot vessels; and to construct a confined disposal 
facility that would create a 700 acre marsh and provide shoreline 
protection behind the disposal facility. 
The Monroe Harbor Study was included in the FY 1984, 1985, 
and 1986 budgets under the category "Continuation of Planning 
and Engineering" for the purpose of collecting updated and detailed 
project data, reevaluating project channel dimensions and 
dredged material disposal requirements, reaffirming project 
economic and environmental feasibility, and preparing 
preliminary project design. Although no major change in the 
scope of the recommended plan is anticipated at this time, a reduction 
in recommended channel width and alternative dredge 
material disposal options were considered. The report is under 
review at North Central Division. In FY 87 a minor adjustment 
of -$116 was made to prior year costs. 
DULUTH-SUPERIOR HARBOR, MN-WI: 
A Final Survey Report recommending a commercial navigation 
project at Duluth-Superior Harbor, MN-WI, was completed 
in November 1982. The report recommends deepening approximately 
4.0 miles of navigation channels (North, South, Upper 
and Minnesota Channels) in the St. Louis River to a 27 foot project 
depth, widening the Cross Channel turning basin to 1,500 
feet, widening the bend at the Arrowhead Bridge to 600 feet and 
disposing the dredged material in the 130 acre Superior Forest 
upland confined disposal site. 
FY 1987 costs for initiating the General Design Memorandum 
for Duluth-Superior Harbor, MN-WI, were $149,543. 
83. COLLECTION AND STUDY OF 
BASIC DATA 
FY 87 costs for International Water Studies were $25,971, and 
$146,800 for Flood Plain Management Services. A special 
hydrologic study to develop a regional flood frequency study for 
the Saginaw River Basin was continued in FY 87 at a cost of 
$1,974. 
Flood Insurance Studies. Nine Flood Insurance Studies were 
completed in FY 87. They were: Allen County, IN; and in 
Michigan, Banger City, Van Buren County; Allegan City, 
Allegan County; AuGres City and AuGres Township, Arenac 
County; Clare City, Clare County; Manistee Township, Manistee 
County; Mayfield Township, Lapeer County; and Scio Township, 
Washtenaw County. The studies were completed at a total cost 
of $219,000. The FY 87 costs were $16,274, $8,203, $6,479, 
$5,463, $16,077, $7,035, $9,151, $5,894, and $8,737, respectively. 
Flood Insurance Studies for Novi City, Oakland County; 
Three Rivers City, St. Joseph County; Lapeer Township, Lapeer 
County; as well as the new starts in FY 87 for Ann Arbor City, 
Washtenaw County; Armada City, Macomb County; Holland City, 
Ottawa County; Holland Township, Ottawa County; Adrian 
Township, Lenawee County; Chassell Township, Houghton 
County; Manistique City, Schoolcraft County; Northfield 
Township, Washtenaw County; and Pittsfield Township, 
Washtenaw County, MI will be completed in FY 88. The FY 
87 costs associated with these studies were $32,810, $14,930, 
$16,209, $17,887, $8,399, $2,639, $5,126, $7,347, $7,153, 
$8,304, $14,662, and $2,781, respectively. In addition, work was 
initiated on a Flood Insurance study for Sheboygan County, WI 
at a total FY 87 cost of $17,524. Final coordination meetings 
were held on completed flood insurance studies for the Village 
of Blissfield, Lenawee County; Hamlin Township, Mason County; 
City of Memphis, Macomb County; Sault Ste. Marie, Chippewa 
County; and Summit Township, Mason County, MI. The 
FY 87 costs for these meetings were $635, $1,858, $725, $194 
and $1,972, respectively. 
Costs in FY 87 in support of the Federal Emergency Management 
Agency's Community Assistance Program, limited map 
maintenance program, and a special study on Great Lakes wave 
runup were $25,512, $30,080, and $16,460, respectively. 
31-31

DETROIT, MI DISTRICT 
COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
in Text Project Funding FY84 FY85 FY86 FY87 Sept.30,1987 
2. Arcadia Harbor, 
MI 
3. Ashland Harbor, 
WI 
4. Big Bay Harbor, 
MI 
5. Black River Harbor, 
MI (U.P.) 
6. Bolles Harbor, 
MI 
7. Caseville Harbor, 
MI 
8. Charlevoix Harbor, 
MI 
9. Cheboygan Harbor, 
MI 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
- - 0 
62,514 291,000 117,000 
67,248 263,563 144,618 
433,000 
387,088 
238,000 27,552 115,000 364,948 
246,921 15,687 129,603 360,246 
- - 8,757 144,000 
- - 8,757 141,882 
11,000 81,000 -6,000 
10,912 65,033 8,645 1,410 
- 26,412 167,964 222,422 
- 18,642 153,415 143,902 
- - - 261,899 
- - - 257,106 
272,000 63,000 182,000 
288,220 52,979 154,568 
- - 0 
- - 0 
10,000 
10,585 
2,396 
2,798 
-16,528 
-15,337 
253,000 
251,394 
14,371 
11,099 
31-32 
TABLE 31-A 
0
0 
1,688,362 
1,641,905 
1,695,645 
1,695,645 
2,975,296 
2,970,594 
390,433' 
390,433' 
1,167,428 
1,165,310 
383,350 
383,350 
578,423 
578,423 
426,4132 
426,4132 
1,293,263 
1,192,424 
1,190,550 
1,190,550 
587,314 
587,314 
1,101,093 
1,096,300 
180,623 
180,623 
5,306,900 
5,265,634 
1,129,396 
1,129,396 
504,236 
504,236 
875,101 
871,340

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 31-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
in Text Project Funding FY84 FY85 FY86 FY87 Sept.30,1987 
10. Clinton River. New Work 
MI 
11. Detour Harbor, 
MI 
Contributed funds 
12. Detroit River, 
MI 
Contributed Funds 
13. Duluth-Superior Harbor, 
MN and WI 
15. Fox River, 
WI 
16. Frankfort Harbor, 
MI 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
16,001 
16,001 
6,539 8,662 89,661 
6,539 8,662 89,661 
115,000 40,000 71,000 261,000 
88,419 62,567 72,663 237,122 
-34,600 - - - 
1,455 - - - 
-975 
1,478 
1,478 
5,975 
4,266 
3,900 
3,752 22,320 
4,118 12,331 
549,7983 
549,7983 
1,113,120 
1,113,120 
722,200 
691,823 
1,354,910 
1,354,910 
1,204,436 
1,204,436 
32,096 
22,107 
--- - 76,877,3574 
- - - - 76,877,3574 
3,894,546 9,438,900 3,446,800 4,017,500 76,611,324 
4,546,281 8,932,080 4,109,489 4,030,841 76,551,690 
-14,000 25,000 0 
5,459 22,256 1,383 
- - 242,280 
- - 203,000 
54 
72,612 
89,344 
41,400,694 
41,397,664 
314,892 
292,344 
- - - - 16,109,2585 
- - - - 16,109,2585 
2,431,000 3,377,400 1,973,700 2,219,700 37,601,970 
2,687,668 3,493,775 1,945,302 2,304,284 37,549,923 
2,410,000 4,830,000 3,773,000 
2,291,677 4,773,781 3,930,167 
1,556,249 
1,556,249 
11,013,000 
10,995,625 
- - - - 3,753,3346 
S- - - 3,753,3346 
1,782,000 1,018,000 1,063,000 1,246,100 38,141,7737 
1,603,620 1,247,075 1,064,843 1,251,433 38,106,4947 
372,500 72,000 45,000 150,999 
367,153 75,243 49,296 150,723 
23 
1,955,1598 
1,955,1598 
6,429,896 
6,426,739 
274,776 
274,776 
1,204,500 
1,204,500 
31-33

DETROIT, MI DISTRICT 
TABLE 31-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section To 
in Text Project Funding FY84 FY85 FY86 FY87 Sept.30,1987 
17. Grand Haven Harbor, 
MI 
Section 111 
Section 111 
Contributed Funds 
19. Grand Marais Harbor, 
MN 
20. Grand Traverse Harbor, 
MI 
21. Green Bay Harbor, 
WI 
22. Hammond Bay Harbor, 
MI 
Section 111 
Section 111 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
887,546 1,442,616 615,700 673,200 
3,551,803 1,497,972 615,944 670,055 
125,000 203,184 1,181,500 91,000 
70,860 236,764 1,204,587 92,608 
15,334 251 - 251 - 
50,000 292,000 1,079,000 -16,000 
44,199 273,423 1,071,033 -3,820 
1,283,4699 
1,283,4699 
175,000 
175,000 
21,057,35510 
21,050,71310 
813,613 
813,613 
780,400 
780,400 
1,824,684 
1,823,679 
27,200 
15,585 
450,972 
450,972 
1,998,879 
1,962,978 
1,230,000 
1,230,000 
- - - - 266,037 
- - - - 266,037 
- - 0 89,000 1,663,653 
- - 0 87,584 1,662,237 
- - - - 9,946,39511,12 
- - - - 9,946,39511,12 
917,350 1,035,672 1,761,000 1,299,000 17,262,23513 
961,792 1,069,546 1,604,864 1,384,841 17,159,32313 
230,000 395,000 290,000 205,000 
211,613 390,568 310,913 205,760 
3,244 
4,000 
3,683 
25,000 
19,202 
68,875 2,898 
58,841 12,430 
- 25,000 
2,669 26,647 
7,465 
8,284 
-647 
6,788,807 
6,784,523 
1,015,366 
1,015,366 
77,000 
77,000 
436,300 
436,300 
50,000 
47,872 
31-34

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 31-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section To 
in Text Project Funding FY84 FY85 FY86 FY87 Sept.30,1987 
23. Harbor Beach Harbor, 
MI 
24. Harrisville Harbor, 
MI 
Contributed Funds 
Section 111 
Section 111 
25. Holland Harbor, 
MI 
Section 111 
Section 111 
26. Inland Route, 
MI 
27. Kenosha Harbor, 
WI 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
60,000 532,200 313,949 295,641 
113,766 525,580 310,694 252,600 
-90,000 
232,368 
70,000 
259,445 
22,000 
320,813 
4,000 
8,239 
1,422,760 
1,758,195 
35,000 
33,713 
-15,000 
-63,981 
-32,516 
24,215 
6,401 
3,376 
13,000 
11,137 
571,720 
934,563 
558,000 
421,857 
-36,700 
12,281 
1,603 
3,770 
24,000 
25,557 
507,000 
484,876 
694,000 
828,919 
219,000 
215,143 
51,000 
41,887 
1,200,598 
1,200,598 
6,334,980 
6,279,621 
194,504 
194,504 
243,100 
243,100 
1,849,938 
1,849,938 
287,454 
287,454 
502,000 
502,000 
975,201 
970,352 
88,000 
78,581 
- 771,82714,15 
- 771,827'14,15 
- 621,000 
- 621,000 
454,000 12,860,712 
472,286 12,852,592 
80,000 1,540,200 
74,093 1,529,447 
- 502,452 
- 502,452 
2,400 90,000 86,000 64,000 
12,934 90,723 60,666 85,167 
30,000 
38,658 
368,000 
380,004 
12,000 
3,726 
94,491 
107,405 
8,077 
208,000 
168,916 
1,072 
1,182,600 
1,206,019 
1,663,300 
1,663,300 
918,222'6 
918,222'6 
2,295,888 
2,287,000 
404,300 
404,300 
988,96917,18 
988,969",' 18 
4,143,46819 
4,126,34919 
1,270,275 
1,270,275 
31-35

DETROIT, MI DISTRICT 
TABLE 31-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section To 
in Text Project Funding FY84 FY85 FY86 FY87 Sept.30,1987 
28. Kewaunee Harbor, 
WI 
29. Keweenaw 
Waterway, MI 
30. Lake St. Clair, 
MI, Channels 
31. Leland Harbor, 
MI 
32. Lexington Harbor, 
MI 
Contributed Funds 
Section 111 
Section 111 
33. Little Lake Harbor, 
MI 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
4,378,600 
4,378,600 
- 6,000 
- 6,000 
406,250 189,000 
400,880 218,132 
243,000 
225,007 
- 758,33320 
- 758,33320 
172,000 3,725,59121 
159,073 3,694,38521 
- 617,300 
- 617,300 
- - - - 2,961,461 
- - - - 2,961,461 
- - - - 5,974,141 
- - - 5,974,141 
309,000 410,000 681,000 2,822,000 14,373,68422 
329,088 438,285 668,439 2,777,736 14,298,89522 
70,000 72,000 241,000 855,000 
90,863 70,506 220,193 875,855 
1,346,000 
1,342,589 
--- - 7,675,35723 
- - - - 7,675,35723 
745,400 297,000 262,600 103,000 7,258,08424 
767,954 299,095 260,663 105,926 7,240,71824 
- - - - 5,119,800 
S- - - 5,119,800 
236,466 66,600 100,000 105 
251,778 62,264 104,735 100 
12,000 
11,033 
20,000 
19,789 
3,131 
4,125 
254,000 
101,984 
26( 
402 
- 49 
- 22 
),000 88 
7,397 92 
165,283 229,458 263,000 165 
135,253 256,986 279,129 166 
- 1,027,08925 
- 1,027,08925 
,000 1,618,511 
),159 1,613,129 
- 70,678 
- 70,678 
- 1,646,304 
- 1,646,304 
1,088,888 
- 1,088,888 
- 372,000 
- 372,000 
,000 173,044 
,997 147,041 
,000 802,000 
,307 801,477 
- 600,47826 
- 600,47826 
,600 2,934,115 
,243 2,926,258 
31-36

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 31-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section To 
in Text Project Funding FY84 FY85 FY86 FY87 Sept.30,1987 
34. Ludington Harbor, 
MI 
Section 111 
Section 111 
35. Mackinac Island Harbor, 
MI 
Contributed Funds 
36. Manistee Harbor, 
MI 
37. Manitowoc Harbor, 
WI 
Contributed Funds 
38. Marquette Harbor, 
MI 
39. Menominee Harbor 
& River, MI & WI 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
- - - - 7,912,20227 
- - - - 7,912,20227 
- - - - 620,000 
- - - - 620,000 
564,366 427,900 329,000 1,743,000 10,149,56628 
544,182 420,772 337,698 1,764,395 10,141,72228 
- - - - 357,913 
- - - - 357,913 
- 710,540 -64,000 41,800 703,340 
- 692,796 -46,931 40,390 701,255 
- 22,274 136,000 
- 22,023 59,616 
474,300 
466,666 
10,000 
22,154 
9,206 
1,883 
309,690 
763,277 
229,085 
229,085 
105,004 
105,004 
229,744 
153,109 
- - - 2,696,52229 
- - - 2,696,52229 
29,000 816,000 777,000 5,931,73330 
36,254 791,534 784,446 5,911,33330 
- - - 1,374,164 
- - - 1,374,164 
-141,950 
-137,174 
-74,718 
114,139 
124,000 
125,891 
9,206 
296,000 2 
300,389 2� 
- 2,048,91431' 
- 2,048,91431' 
9,206 1,957,700 
- 1,911,076 
83,000 5,210,51532 
97,160 5,198,44832 
73,192 22,448 204,384 184,646 
73,577 21,556 204,324 185,349 
3,081,756 
3,081,756 
1,282,893 
1,282,893 
1,991,927 
1,991,678 
465,757 
465,757 
- - - - 533,47633 
- - - - 533,47633 
113,000 55,000 104,000 149,886 1,934,34034 
35,520 123,282 109,403 149,204 1,927,22934 
- - - - 1,351,852 
- - - - 1,351,852 
31-37

DETROIT, MI DISTRICT 
TABLE 31-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
in Text Project Funding FY84 FY85 FY86 FY87 Sept.30,1987 
Contributed Funds 
40. Milwaukee Harbor, 
WI 
41. Monroe Harbor, 
MI 
Contributed Funds 
42. Muskegon Harbor, 
MI 
Section 111 
Section 111 
43. New Buffalo Harbor, 
MI 
Contributed Funds 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
47,000 110,000 -10,000 
64,434 101,568 2,288 
1,106,700 74,000 
1,027,490 168,317 
- 2,010,000 
- 1,940,752 
440,000 
399,452 
3,205,000 
3,189,537 
593,660 
591,014 
36,762 
36,762 
- 8,231,02435 
- 8,231,02435 
2,783,000 27,379,27436 
2,753,156 27,305,68136 
1,235,000 8,341,810 
1,229,552 8,251,651 
- - - 6,380,925 
- - - 6,380,925 
- - - 987,340 3 7 
- - - 987,34037 
777,450 1,873,000 1,640,900 1,576,000 14,354,12037 
656,686 1,936,061 1,700,939 1,577,775 14,321,46737 
2,850,000 995,000 -17,000 
6,152,561 1,024,457 -23,493 
610 
579,000 
574,185 
20,000 
16,028 
-350,000 
3,315,594 
-1,000 
34,881 
- - -1,818 
- - 5,442 
81,000 
90,592 
48,000 
34,955 
5,100,000 
4,996,129 
86,000 
89,926 
1,593,000 
1,602,842 
1,337,300 
1,468,604 
112,000 311,600 526,000 
105,922 173,015 664,118 
80,000 
77,241 
45,000 
58,390 
60,000 
84,085 
5,000 
10,057 
38,620,900 
38,615,469 
83,182 
83,182 
2,912,11038 
2,912,11038 
105,000 
105,000 
5,524,11539 
5,519,79139 
1,949,000 
1,949,000 
13,824,300 
13,815,663 
1,285,716 
1.285,716 
1,186,467 
1,186,467 
2,803,153 
2,800,880 
181,500 
181,500 
31-38

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 31-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section To 
in Text Project Funding FY84 FY85 FY86 FY87 Sept.30,1987 
44. Ontonagon Harbor, 
MI 
45. Pentwater Harbor, 
MI 
46. Point Lookout Harbor, 
MI 
Contributed Funds 
47. Portage Lake, 
MI 
48. Port Austin Harbor, 
MI 
49. Port Sanilac Harbor, 
MI 
Contributed Funds 
Section 111 
Contributed Funds 
Section 1ll 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
157,000 
162,633 
359,300 
353,444 
150,000 
145,546 
544,000 
541,664 
83,000 
77,669 
916,000 
919,158 
56,000 
48,354 
443,600 
420,997 
97,533 174,004 194,666 221,000 
99,697 169,340 194,467 222,504 
124,734 441,522 1,701,100 33,991 
263,875 291,697 1,882,296 35,484 
8,651 
- -2,743 
- 606 
1,340 13,336 120,385 
1,584 8,544 125,487 
- - 52,000 
- - 50,753 
17,272 531,472 60,613 
9,795 48,528 544,368 
13,854 
14,664 
50,000
5 
-62,502 
-55,855 
16,522 16,000 1,772 177,000 
16,065 9,552 8,676 51,263 
230,000 249,000 
222,335 71,321 
- 207,000 
185,852 45,478 
31-39 
942,90340 
922,82240 
8,124,15341 
8,089,4454' 
21,000 
21,000 
179,899 
179,899 
3,246,255 
3,241,833 
2,642,584 
2,642,584 
2,972,181 
2,969,004 
121,600 
121,600 
9,257 
9,257 
256,129 
256,129 
1,565,071 
1,565,071 
1,230,33442 
1,179,09242 
1,563,131 
1,563,111 
159,000 
159,000 
909,963 
909,963 
487,108 
487,108 
336,000 
336,000 
1,752,184 
1,626,446 
115,000 
115,000 
9,158 
9,158 
1,009,000 
845,047

DETROIT, MI DISTRICT 
TABLE 31-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section To 
in Text Project Funding FY84 FY85 FY86 FY87 Sept.30,1987 
50. Presque Isle Harbor, 
MI 
Section 111 
51. Rouge River, 
MI. 
52. Saginaw River, 
MI. 
(Federal Funds) 
(Contributed Funds) 
53. St. Clair River, 
MI. 
54. St. Joseph 
Harbor, MI. 
Section 111 
Section 111 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
30,700 
32,626 
203,347 
134,363 
600 
63,355 
7,331 
00 
00 
182,100 
176,994
00 
0
0 
1,190,492 
1,190,492 
61,700 
61,700 
887,802 
882,696 
76,500 
76,500 
16,500 
16,500 
- - - - 675,2514> 
- - - -675,25143 
859,615 776,500 711,700 2,685,000 18,432,60344 
835,802 836,762 694,589 2,673,425 18,389,31744 
24,085 
10,000 
4,885 329 
- 14,523,823 
12 14,517,042 
- - - - 14,917,12745 
- - - - 14,917,12745 
- - - - 13,600 
- - - - 13,600 
5,531,140 2,781,675 626,200 2,548,000 35,297,295 
5,729,604 2,829,598 680,370 2,422,846 35,161,304 
223,000 260,000 182,500 126,000 19,311,90046 
184,873 256,689 207,953 149,558 19,309,49246 
1,224,256 
1,259,444 
1,510,000 816,100 
1,462,529 863,958 
- 19,213,246 
- 19,213,246 
1,527,000 16,347,913 
1,519,667 16,325,555 
413,616 511,900 611,000 647,000 
423,156 506,647 591,221 670,265 
21,000 
51,533 
333,000 
258,348 
31-40 
135,000 
127,783 
114,000 
152,156 
14,595 
730,000 
632,995 
868 
387,000 
520,434 
976,48547 
976,48547 
828,000 
828,000 
8,831,465 
8,823,106 
962,216 
962,216 
643,776 
643,776 
3,732,300 
3,695,177

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 31-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section To 
in Text Project Funding FY84 FY85 FY86 FY87 Sept.30,1987 
55. St. Marys River, 
MI 
56. Saugatuck Harbor, 
MI 
and Kalamazoo 
River, MI 
57. Saxon Harbor, 
WI 
Section 111 
58. Sebewaing River, 
MI 
59. Sheboygan Harbor, 
MI 
60. South Haven Harbor, 
MI 
Section 111 
Section 1ll 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
--- - 160,657,07148 
-- - - 160,657,07048 
10,006,700 9,221,000 9,704,800 9,934,400 186,501,508 
10,323,209 8,973,402 9,761,729 9,497,511 185,509,068 
- - - - 13,100 
- - - - 13,100 
- - - 364,52749 
- - - - 364,52749 
-15,000 265,100 78,559 29,270 3,031,55650 
19,969 249,974 95,146 26,250 3,028,38050 
41,500 
39,200 
6,649 
6,649 
3,000 
4,685 
56,259 
36,398 
-1,130 
477 
2,237 
25,098 
15,191 
2,434 
230,400 
111,517 
426,50751' 
426,5075' 
667,870 
667,870 
430,793 
418,036 
35,573 
35,573 
2,519,833 
2,400,950 
-- - - 1,136,08852 
-- - - 1,136,08852 
775,000 157,000 327,000 301,000 5,112,39253 
1,449,627 124,641 363,502 251,568 5,061,80653 
- - - - 609,028 
- - -- 609,028 
203,000 82,000 -15,000 
200,475 68,476 9,231 
907,792 
64 907,792 
- - - - 452,42654 
- - - - 452,42654 
- - -- 532,000 
- - - -532,000 
-10,000 148,868 87,000 197,335 3,681,80155 
15,372 133,324 84,580 194,378 3,660,68055 
- - -- 1,632,076 
--- - 1,632,076 
25,000 483,000 312,000 
14,741 125,600 669,316 3,198 
42,381 
42,381 
1,144,000 
1,136,855 
31-41

DETROIT, MI DISTRICT 
TABLE 31-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section To 
in Text Project Funding FY84 FY85 FY86 FY87 Sept.30,1987 
61. Sturgeon Bay, 
WI & Lake MI 
Ship Canal, WI 
62. Two Harbors, 
MN 
63. Two Rivers Harbor, 
WI 
64. White Lake Harbor, 
MI 
Section 11ll 
Section 111 
73. Paw Paw Lake, 
MI 
75. Saginaw River, 
MI 
(Federal Funds) 
(Contributed Funds) 
76. Sebewaing, 
Sebewaing River, 
MI 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Diked 
Disposal 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
- - - - 1,059,72256 
- - - - 1,059,72256 
72,000 406,000 176,000 141,300 7,239,91557 
68,069 234,819 346,931 121,157 7,215,13857 
-9,000 37,000 
9,057 25,485 11,953 
311,119 
311,119 
884,899 
884,899 
_- - 4,170,71058 
- - 4,170,71058 
- 24,521 1,929,714 
- 13,315 1,918,508 
- - - - 360,320 59 
- - - - 360,320 59 
27,000 131,000 21,978 23,416 5,409,48260 
26,890 119,914 21,017 15,445 5,389,35460 
- - - - 1,187,472 
- - - -1,187,472 
- - --- - 58,057 
- - - - 58,057 
-5,300 
1,678 - 
-20,000 193,000 
13,691 189,917 
- 262,000 
- 214,040 
98,000 
98,248 
389,000 
429,111 
95,000 
91,872 
49,000 
53,483 
90,000 157,000 2,900,000 125,000 
77,031 139,660 2,777,125 263,233 
658,400 180,000 
957,427 108,667 
-10,500 
11,411 
57,336 44,928 
...-. 
17,000 9,000 
7,332 16,224 
5,000 
8,000 
207,862 
207,862 
249,700 
249,700 
2,253,463 
2,246,700 
700,000 
696,634 
3,592,000 
3,577,044 
24,553,359 
24,547,164 
173,000 
172,997 
365,64261 
365,64261 
396,644 
396,644 
31-42

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 31-A (Continued) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section To 
in Text Project Funding FY84 FY85 FY86 FY87 Sept.30,1987 
80. Surveillance of New Work 
North Boundary Waters Approp. - - - - 0 
Cost - - - - 0 
Maint. 
Approp. 1,234,000 1,596,000 1,330,000 1,230,000 41,454,33462 
Cost 1,281,669 1,587,312 1,308,778 1,278,991 41,421,18562 
'Excludes $56,500 contributed funds. 
2Includes $255,000 contributed funds. 
3Includes $25,500 for previous projects and $289,752 contributed 
funds for existing projects. 
4Includes $2,097,254 for previous projects. 
5Includes $1,547,195 for new work for previous projects. 
6Includes $3,239,910 for previous projects. 
7Includes $89,309 for previous projects. 
8Includes $31,709 contributed funds. 
9Includes $311,329 for previous projects. 
'0Includes $13,437 for previous projects. 
"Includes $396,974 for previous projects. 
'2Includes $109,463 for previous projects. 
'3Includes $8,918 for previous projects. 
14Includes $176,620 for new work, $127,598 for maintenance. 
'5Includes $35,705 contributed funds. 
'6Includes $148,000 contributed funds for existing project. 
"Includes $453,839 for previous projects. , 
' Excludes $3,000 contributed funds. 
'9Includes $21,818 for previous projects. 
20Includes $149,312 for previous projects. 
21Includes $88,364 for previous projects. 
22Includes $402,242 for previous projects 
23Includes $656,000 for previous projects. 
24Includes $235,346 for previous projects. 
25lncludes $354,139 contributed funds. 
26Includes $57,670 contributed funds. 
27Includes $491,416 for previous projects. 
28Excludes $136,286 contributed funds. 
29Includes $354,999 for previous projects. 
30Includes $150,910 for previous projects. 
3'Includes $400,126 for previous projects. 32Includes $54,288 for previous projects. 
33Includes $312,423 for previous projects. 
34Includes $36,194 for previous projects. 
35Includes $1,293,220 for previous projects. 
36Includes $459,305 for previous projects. 
37Includes contributed funds of $300,000 for new work and $166,667 
for maintenance contributed by: Port Commission of Monroe, $300,000; 
Consolidated Paper Co., $125,000 and River Raisin Co., $41,667. 
38Includes $613,408 for previous projects. 
39Includes $446,183 for previous projects. 
40Includes $284,802 for previous projects. 
41lncludes $113,326 for previous projects. 
4 2Includes $172,100 contributed funds. 
43Includes $50,084 for previous projects. 
44Includes $56,608 for previous projects. 
45Includes $962,556 for previous projects. 
46Includes $1,671,660 Public Works Funds and $49,419 
emergency relief funds. 
47Includes $503,113 for previous projects. 
48Includes $2,904,807 for previous projects. 
49Includes $90,232 for previous projects. 
5oIncludes $117,554 for previous projects. 
51Excludes $50,193 contributed funds. 
52Includes $487,817 for previous projects. 
53Includes $87,131 for previous projects. 
54Includes $187,233 for previous projects. 
"5Includes $131,239 for previous projects. 
56Includes $323,419 for previous projects. 
"Includes $219,730 for previous projects. 
5sIncludes $48,404 national recovery act for new work funds. 
"5Includes $212,857 for previous projects. 
6 0lncludes $33,113 for previous projects. 
6 Includes $15,000 for previous projects. 
62lncludes $3,973,897 for previous projects. 
31-43

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 31-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Sep. 19, 1890 
Mar. 2, 1919 
Sep. 2, 1919 
Aug. 30, 1935 
Oct. 27, 1965 
Nov. 17, 1986 
Mar. 3, 1905 
Aug. 5, 1886 
Aug. 11, 1888 
Mar. 3, 1899 
Jun. 6, 1900 
Aug. 8, 1917 
Jul. 3, 1930 
Aug. 30, 1935 
Mar. 2, 1945 
Jul. 14, 1960 
Mar. 2, 1945 
Mar. 2, 1945 
Jul. 6, 1965 
Oct. 23, 1962 
Aug. 14, 1876 
Aug. 2, 1882 
Jun. 13, 1902 
Jun. 20, 1938 
Mar. 29, 1977 
Jun. 2, 1896 
Mar. 2, 1907 
ALPENA HARBOR, MI (See Section 1 of Text) 
Channel depth of 162 feet 
Rubblemound breakwater for protecting channel 
on south side and widening entrance channel. 
21 and 18'/f2oo t channel depths and turning basin. 
Present project dimensions, New turning basin. 
Removal of old breakwater,and construction 
of new breakwater. 
Deauthorization of the feature authorized by the 
1965 River and Harbor Act. 
ARCADIA HARBOR, MI (See Section 2 of Text) 
Maintenance of existing 12-foot channel. 
ASHLAND HARBOR, WI. (See Section 3 of Text) 
Breakwater 7,900 feet long and dredging to remove a shoal. 
Appropriation of $60,000 for 'Continuing improvements on enlarged 
project.' (On completion of Poe Lock in 1896, with available depth of 
20 feet, dredging at Ashland Harbor was carried to a similar depth.) 
Detached breakwater extending 4,700 feet out from shore at a point 
2,600 feet east of main breakwater (prolonged) and parallel thereto. 
Project modified by omitting detached breakwater and defining depth and 
extent of channel to be dredged. 
Widening part of present channel for entrance channel and for basin in 
eastern part of harbor. 
Deepening east basin to 25 feet and west channel, as far as 8th Ave. West 
extended to 21 feet. 
Widening west channel to 750 feet at its westerly end. 
Deepening portions of East Basin and West Channel to 27 and 21 feet, 
respectively. 
BIG BAY HARBOR, MI (See Section 4 of Text) 
Provides for converging piers extending from shore, an entrance 
channel between piers and a rectangular harbor basin. Project depths are 
12 feet in entrance channel and 10 feet in harbor basin. 
BLACK RIVER HARBOR, MI (UPPER PENINSULA) 
(See Section 5 of Text) 
Two converging breakwaters, an entrance channel between breakwaters, 
an inner channel, and an irregular harbor basin. Project depths 12 feet in 
approach channel and 8 feet in the river channel and basin. 
BOLLES HARBOR, MI (See Section 6 of Text) 
Entrance channel in Lake Erie, Access channel in LaPlaisance Creek, 
Steel sheet pile revetment. 
CASEVILLE HARBOR, MI (See Section 7 of Text) 
Channel 10 to 8 Feet Deep Protected by Breakwater. 
CHARLEVOIX HARBOR, MI (See Section 8 of Text) 
Channel from Lake Michigan to Round Lake protected where needed 
by piers and revetments. 
Channel from Round Lake to Lake Charlevoix. 
Project depth increased to 15 feet. 
Project depth increased to 18 feet. 
Project depth increased to 24 and 23 feet, and construction of 
revetment upstream of Highway Bridge. 
CHEBOYGAN HARBOR, MI (See Section 9 of Text) 
18/2 foot channel. 
8'/f2o ot channel. 
31-44 
Annual Report, P. 2288, 
H. Doc. 830, 65th Cong., 2d 
Sess., and livers Committee 
Doc. 1, 67th Cong., 1st Sess. 
Rivers and Harbors Comm. 
Doc. 42, 72nd Cong., 1st Sess. 
H. Doc, 151, 88th Cong., 1st Sess.' 
H.R.6 (formerly S. 1567), 99th Cong. 
2d Sess. (W.R.D.A. of 1986) 
H. Doc. 194, 58th Cong., 2d Sess. 
H.Ex. Doc. 89, 48th Cong., 2d Sess. 
Annual Reports, 1886, p. 1674; and 
1887, p. 1966. 
H. Doc. 1698, 64th Cong., 2d Sess. 
S. Doc. 133, 71st Cong., 2d Sess. 
Rivers and Harbors Committee 
Doc. 46, 82d Cong., 1st Sess. 
H. Doc. 337, 77th Cong., 1st Sess. 
H. Doc. 165, 86th Cong., 1st Sess.' 
H. Doc. 446, 78th Cong., 2d 
Sess.' 
H. Doc. 446, 78th Cong., 2d Sess.' 
Section 107, 1960 River and 
Harbor Act. 
H. Doc. 64th Cong., 1st Sess.' 
S. Ex. Doc. 16, 44th Cong., 1st 
Sess., and Annual 
Report 1876, p. 523 
No Prior Survey of Estimates. 
No Prior Survey of Estimates. 
S. Doc. 163, 75th Cong., 3rd Sess.' 
Section 107, 1960 River and 
Harbor Act. 
Annual Report, 1895, p. 2823 
H. Doc. 357, 59th Cong., 1st Sess.

TABLE 31-B (Continued) 
DETROIT, MI DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 26, 1937 
May 17, 1950 
Oct. 21, 1964 
Aug. 5, 1886 
Jul. 19, 1963 
Jun. 3, 1969 
Jun. 13, 1902 
Mar. 3, 1905 
Jun. 25, 1910 
Mar. 4, 1913 
Mar. 2, 1907 
Jun. 25, 1910 
Mar. 2, 1910 
Jul. 3, 1930 
Aug. 30, 19353 
Aug. 26, 1937 
Mar. 2, 1945 
Jul. 24, 1946 
May 17, 19504 
Mar. 21, 1956 
Jul. 14, 1960 
Aug. 13, 1968 
Turning Basin. 
21-foot channel to East 1st St., Enlarge Turning Basin, 
deepen to 21 feet. 
Breakwater. 
CLINTON RIVER, MI (See Section 10 of Text) 
Channel in River and Lake St. Clair, Pile Dike, 
Closing channels and making Cutoff, and 
revetments as needed. 
Widening entrance channel and constructing protected 
harbor basin. 
DETOUR HARBOR, MI (See Section 11 of Text) 
Small boat harbor and harbor of refuge, 10-foot channel, 
8-foot deep access channel protected by 1,000-foot breakwater. 
DETROIT RIVER, MI (See Section 12 of Text) 
Amherstburg Channel and removal of Grosse Ile 
shoal. 
Fighting Island Channel. 
Livingstone Channel. 
Channel Depths of 26 and t5 feet. 
Channel to Wyandotte 21 feet deep and 300 feet wide through 
Middle Ground opposite Head of Fighting Island. 
Trenton Channel and Turning Basin (West of 
Grosse Ile). 
American Channel North of Belle Isle between 
Windmill Point and Fairway Slip, Detroit. 
Deepen Westerly 300 feet of Amherstburg Channel 
and Ballards Reef Channel below Livingstone 
Channel to 27 feet to provide depths adequate 
for 24-foot draft navigation when governing Lakes 
are at Datum, with necessary widening at approaches 
and bends and construction of necessary compensating 
works. Detroit River. 
Extend Turning Basin in Trenton Channel 600 feet. 
Dredge through East Draw of lower Grosse Ile Bridge and 
extend 300-foot width of Channel North of lower Grosse Ile Bridge. 
Channel Depth of 28.5 feet throughout downbound and Two-Way 
Channels, except in upper (27.7-foot depth) and lower, (29-foot 
depth) Livingstone Channel, and in upbound Channel; 27-foot depth 
in Ballards Reef Channel below junction with Livingstone Channel. 
27.5-foot depth in westerly 300-foot width of Limekiln Crossing 
and Amherstburg Reaches, and 28.5-foot depth in westerly 300-foot 
width of Hackett Beach, with necessary compensation works. Also 
28.5-foot depth in Lake Erie from Detroit River to Pelee Passage Shoal. 
Inclusive. 
Trenton Channel; Deepen to 27 feet, where necessary, Wyandotte 
Reach from Detroit River to Upper Grosse Ile Bridge, about 
5.5 miles, deepen to 28 feet and widen to 300 feet below Upper 
Grosse Ile Bridge to and including a Turning Basin 28 feet deep and 15 
across in area outside project limits. 
Trenton Channel: Deepen to 28 feet and widen to 300 feet from the 
Upper Turning Basin at Trenton to Gibraltar, about 20,500 feet 
downstream: Construct a Turning Basin at Gibraltar at a depth of 
28 feet, width of 830 feet, and length of 1,500 feet: Build 
compensating works to maintain water levels. 
H. Doc. 134, 75th Cong., 1st Sess. 
H. Doc. 269, 81st Cong., 1st Sess.' 
Section 107, 1960 River and 
Harbor Act. 
S. Doc. 199, 46th Cong., 2d Sess. 
Annual Report 1880, p. 2062 and 
H. Doc. 210, 44th Cong., 2d Sess. 
and Annual Report 1886, p. 219 
Section 107, 1960 River-and 
Harbor Act. 
Section 107, 1960 River and 
Harbor Act. 
H. Doc. 712, 56th Cong., 1st Sess. 
and 40, 58th Cong., 3rd Sess. 
H. Doc. 17, 62d Cong., 1st Sess. 
H. Doc. 266, 59th Cong., 2nd Sess. 
676, 61st Cong., 2d Sess, and 32, 
65th Cong., 1st Sess. 
H. Doc. 253, 70th Cong., 1st Sess. 
Rivers and Harbors Committee 
Doc. 1, 72nd Cong., 1st Sess.' 
H. Doc. 205, 75th Cong., 1st Sess. 
H. Doc. 734, 79th Cong., 2d Sess. 
H. Doc. 335, 80th Cong., 1st Sess. 
S. Doc. 30, 81st Cong., 1st Sess.' 
S. Doc. 71, 84th Cong., 1st Sess.' 
H. Doc. 319, 86th Cong., 2d Sess.' 
H. Doc. 338, 90th Cong., 2d Sess.' 
31-45

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 31-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
DULUTH-SUPERIOR HARBOR, MN AND WI 
(See Section 13 of Text) 
Jun. 3, 1896 
Jun. 13, 1902 
Mar. 2, 1907 
May 28, 19085 
Jul. 27, 1916 
Mar. 2, 1919 
Jan. 21, 1927 
Jul. 30, 19303 
Aug. 30, 19303 
Jul. 16, 19526 
Jul. 14, 19607 
Oct. 4, 1961 
Nov. 17, 1986 
Aug. 5, 1886 
Sep. 19, 1890 
Jun. 3, 1896 
Jun. 3, 1896 
Jun. 13, 1902 
Mar. 3, 19258 
Jun.26, 19349 
Jul. 3, 195810 
Jun. 23, 1866" 
Mar. 3, 1925 
Aug. 26, 1937 
Oct. 27, 1965 
Jun. 
Jun. 
Sep. 
Jul. 
Jul. 
23, 1866 
14, 1880 
19, 1890 
13, 1892 
3, 1930 
Aug.26, 1937 
Dredging. 
Rebuilding piers at Superior Entry. 
Enlarge plan for Superior Entry and additional dredging near 
draw span of Burlington Northern railway bridge. 
Dredging additional area for basin inside Duluth entrance* to 
22-foot depth. 
Enlarging Superior Harbor Basin. 
Removal of shoal point at southerly end of East Gate Basin. 
Howards Bay Channel, 20 feet deep. 
Deepening and widening channels and basins. 
Deepen Superior Front Channel and a portion of East Gate 
Basin to 25 feet. 
Present project dimensions of channels and basin. 
Abandons northerly portion of 21st Avenue West Channel. 
Deepen portions of the North and South Channels, the entire Upper 
Channel and Minnesota Channel to 27 feet; widen the Cross Channel 
turning basin to 1,500 feet; widen the bend at the Arrowhead Bascule 
Bridge to 600 feet, and construct an upland CDF. 
FOX RIVER, WI (See Section 15 of Text) 
Improvement of Fox River. 
Dredging Fond du Lac Harbor on Lake Winnebago. 
Improvement of Wolf River. 
Improvement of Stockbridge, of Calumet 
and Miller Bay, and of Brothertown Harbor, 
on Lake Winnebago. 
Increased depth in rock cuts on lower river, widen Neenah 
Channel, and a concrete retaining wall at Kaukauna. 
Operation and care of locks and dams provided for with funds from 
War Department appropriations for rivers and harbors. 
Sec. 108, that Federal project structure, appurtenances, and 
real property of Upper Fox River, WI, be disposed of to 
State of Wisconsin. 
FRANKFORT HARBOR, MI (See Section 16 of Text) 
A New Outlet 12 feet deep protected by Piers and Revetments. 
Exterior Breakwaters, removal of portions of Piers, 
Project Dimensions of Outer Basin. 
Dredge the area in Lake Betsie. 
Deepen approach and entrance Channels. 
Extend Inner Basin and Dredge recreational anchorage area. 
GRAND HAVEN HARBOR, MI (See Section 17 of Text) 
Piers and Revetments. 
Piers and Revetments. 
Piers and Revetments. 
Piers and Revetments. 
Present Project dimensions of Harbor Channel to 
Grand Trunk Car Ferry Slip and River Channel. Eliminating all of 
that portion of Grand River above Bass River, Consolidation 
of Projects for Harbor and River. 
Channel to Spring Lake. 
H. Ex. Doc. 59, 53d Cong., 3d Sess. 
and Annual Report, 1895, p. 2538. 
H. Doc. 82, 59th Cong., 2d 
Sess. 
H. Doc. 221, 60th Cong., 1st 
Sess. 
H. Doc. 651, 64th Cong., 1st Sess. 
H. Doc. 1018, 64th Cong., 1st Sess. 
H. Doc. 145, 69th Cong., 1st Sess. 
and Rivers and Harbors Committee, 
Doc. 32, 71st Cong., 2d Sess. 
H. Doc. 482, 72d Cong., 2d Sess. 
H. Doc. 374, 82d Cong., 2d 
Sess. 
H. Doc. 150, 86th Cong., 1st Sess. 
H. Doc. 196, 86th Cong.; 1st Sess. 
H.R.6 (formerly S. 1567) 
99th Cong., 2d Sess. 
(Water Resources Development 
Act of 1986) 
Annual Report, 1885, pp. 2041-2045 
(plan of a board approach Dec. 10, 
1884, as modified by Corps of 
Engineers, May 14, 1886). 
H. Ex. Doc. 24, 51st Cong. 1st Sess. 
Annual Report, 1890, p. 2390. 
No prior survey or estimates. 
No prior survey or estimates. 
No prior survey or estimates. 
H. Doc. 294, 68th Cong., 1st Sess.' 
S. Bill 3910, 85th Cong.,' 2d Sess. 
H. Doc. 482, 5th Cong., 2d Sess. 
H. Doc. 208, 68th Cong.,lst Sess. 
H. Doc. 511, 74th Cong., 2d Sess. 
S. Doc. 16, 89th Cong., 1st Sess.' 
S. Ex. Doc. 42, 35th Cong.,l1st Sess. 
S. Ex. Doc. 42, 35th Cong., 1st Sess. 
S. Ex. Doc. 42, 35th Cong., 1st Sess. 
S. Ex. Doc. 42, 35th Cong., 1st Sess. 
S. Doc. 88, 71st Cong., 2d Sess. 
Rivers and Harbors Committee 
Doc. 1, 75th Cong., 3d Sess.' 
31-46

TABLE 31-B (Continued) 
DETROIT, MI DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 2, 1945 
Nov. 17, 1986 
Jun. 14, 1880 
Jun. 14, 1880 
May 17, 1950 
Nov. 17, 1986 
Mar. 3, 1879 
Aug. 30, 1935 
May 17, 1950 
Mar. 2, 1945 
Jun. 23, 1866 
Jul. 13, 1892 
Jun. 26 1910 
Aug. 8, 1917 
Mar. 3, 1925 
Aug. 30, 19352 
Aug. 26, 1937 
Mar. 2, 1945 
Oct. 23, 1962 
Nov. 17, 1986 
Mar. 2. 1945 
Mar. 3. 1871 
Jan. 21.1927 
Jul. 16, 1984 
Present Project Dimensions of Harbor Channel from 
Car Ferry Slip to Grand Trunk Railway Bridge and Turning Basin. 
Deepen the harbor entrance channel and harbor river channel to 29 and 
27 feet, respectively; provide a new and larger turning basin, trapezoidal 
in shape, 1,200 feet long at the channel, 300 feet long at the shore, 
800 feet at a right angle to the channel and 18 feet deep. 
GRAND MARAIS HARBOR, MI (See Section 18 of Text) 
Existing Project, Except for Pile Dike. 
For Pile Dike. 
800-Foot Extension of West Pier. 
Deauthorization of uncompleted portion of project. 
GRAND MARAIS HARBOR, MN (See Section 19 of Text) 
Breakwaters and dredging of anchorage area of 
26 acres to 16 feet. 
Seawalls across ledge in southeast corner of harbor, 
enlarging anchorage basin and deepening of entrance. 
Small-boat basin with breakwater. 
GRAND TRAVERSE BAY HARBOR, MI 
(See Section 20 of Text) 
Two Parallel piers, and entrance channel between piers and a harbor 
basin. Project depths are 12 feet between piers and 10 feet in basin. 
Project area extended 200 feet upstream in 1966. 
GREEN BAY HARBOR WI (See Section 21 of Text) 
Outer Channel and revetment at Grassy Islands.12 
Inner channel.'12 
Turning basin at DePere. 
Maintenance of turning basin at DePere. 
Increasing depth of inner channel and turning basin to 18 feet. 
Deepen outer channel to 22 feet with widening and straightening 
inside of Tail Point Bend, widen channel in Fox River through 
city of Green Bay to 22 feet. 
Turning basin above Chicago & North Western Ry. Bridge. 
Turning basin at mouth of East River. 
Deepen and widen 9 miles of entrance channel to 26 by 500 feet; 
3.6 miles of entrance channel to 24 by 300 feet; and 3.2 miles 
of existing Fox River to 24 feet deep. 
Deepen the Fox River channel at Green Bay, WI, to 27 feet. 
HAMMOND BAY HARBOR, MI 
(See Section 22 of Text) 
Harbor of Refuge, breakwaters. 
10-foot depth in harbor basin 
12-foot depth in entrance channel. 
HARBOR BEACH, LAKE HURON, MI 
(See Section 23 of Text) 
Adopted Site and made provision for harbor. 
Closing North Entrance and dredging 
Main Entrance and Anchorage Area. 
Removal of portion of Breakwater in interest of sanitation. 
Deepen the waterway within the Marina facility. 
H. Doc. 661, 76th Cong.,3d Sess.' 
H.R.6 (formerly S. 1567) 
99th Cong., 2d. Sess. 
(W.R.D.A. of 1986) 
Specified in Act. Annual Report 
1881, p. 2050. 
Annual Report 1895, p. 351 
H. Doc. 751, 80th Cong., 2d Sess. 
H.R.6 (formerly S. 1567), 
99th Cong., 2d Sess. 
(W.R.D.A. of 1986) 
H. Ex. Doc. 75, 43d Cong., 2d Sess. 
Annual Report, 1875, p. 184. 
Rivers and Harbors Committee 
Doc. 22, 72d Cong., 1st Sess. 
H. Doc. 187, 81st Cong., 1st Sess.' 
H. Doc. 446, 78th Cong., 2d Sess. 
Annual Report, 1867, p. 70. 
Unpublished report approved Aug. 3, 
1892. 
H. Doc. 222, 61st Cong., 2d Sess. 
H. Doc. 1017, 64th Cong., 1st Sess. 
H. Doc. 294, 68th Cong., 1st Sess. 
Rivers and Harbors Committee 
Doc. 40, 72d Cong., 2d Sess. 
Rivers and Harbors Committee 
Doc. 73, 74th Cong., 2d Sess. 
H. Doc. 95, 76th Cong., 1st Sess. 
H. Doc. 470, 87th Cong., 2d Sess.' 
H.R.6 (formerly S. 1567), 
99th Cong., 2d Sess. 
(W.R.D.A. of 1986, Sec 601c) 
H. Doc. 446, 78th Cong., 
2d Sess. 
Annual Report 1873, p. 292 
H. Doc. 1700, 64th Cong., 2d Sess. 
H.R. 5653, 98th Cong., 2d Sess., 
P.L. 98-360 (98 Stat. 405) Sec. 105. 
31-47

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 31-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 2, 1945 
Aug. 30, 1852 
Mar. 2, 1867 
Mar. 3, 1899 
Mar. 3, 1905 
Jul. 3, 1930 
Aug. 30, 1935 
Sep. 3, 1954 
Sep. 3, 1954 
Sep. 2, 1964 
Mar. 3, 1899 
Mar. 2, 1907 
Aug. 30, 19352 
May 17, 1950 
Oct. 23, 1962 
Mar. 3, 1881 
Jun. 25, 1910 
Aug. 30, 19352, 14 
Jul. 14, 1960 
Sep. 19, 1890 
Jun. 25, 1910 
Mar. 2, 1919 
Aug. 30, 1935's5 
HARRISVILLE HARBOR, MI (See Section 24 of Text) 
Harbor of Refuge, Breakwaters. 
12-foot depth entrance channel 
10-foot depth in harbor basin. 
Extend north end of south breakwater 100 feet; extend southeast 
end of north breakwater 145 feet; install two navigation light structures. 
HOLLAND HARBOR, MI (See Section 25 of Text) 
Artificial channel between Lakes 
Macatawa and Michigan.12 
Piers and Revetments.'12 
Extending Inner Piers. 
Converging Breakwater. 
Channel to Holland and Turning Basin 
at Holland. 
Present Project Dimensions of Channels 
at Turning Basin. 
Widen Bend in Reveted Entrance Channel 
into Lake Macatawa, Dredge Channel in Black River, and Widen 
and Extend Turning Basin. 
THE INLAND ROUTE, MI (See Section 26 of Text) 
Channel 30 feet wide and 5 feet deep 
through Lakes and Rivers with suitable jetties. 
Lock and Dam. 
KENOSHA HARBOR, WI (See Section 27 of Text) 
Parallel piers and 600 feet of breakwater' 2. 
Extending breakwater 200 feet. 
Present project dimensions of entrance channel and basin. 
Channel northwesterly from basin. 
Deepen lake approach channel to 27 feet and 800 feet wide; 
deepen approach channel to 26 feet, entrance channel and 
inner basin to 25 feet. 
KEWAUNEE HARBOR, WI (See Section 28 of Text) 
Entrance piers. 
Turning basin. 
North breakwater, remove old north pier, widen and deepen 
entrance channel and turning basin to 20 feet and remove 
outer south shoal. 
Enlarge existing turning basin, extend existing project into 
north basin, and increase depth of north basin to 20 feet 
at a maximum width of 500 feet and eliminate removal of outer shoal. 
KEWEENAW WATERWAY, MI (See Section 29 of Text) 
Acquisition of waterway; for a 16-foot channel of 70-foot 
bottom width, renew canal revetments, reconstruct and extend 
piers at upper entrance to 30-foot depth of water, and at proper 
time for increase of channel depth to 20 feet with bottom width 
of not less than 120 feet (increase in width and depth of channel 
approved Mar. 15, 1898). 
Anchorage basin just within lower entrance about one-half mile 
long, 800 feet wide; a mooring pier on its westerly side 2,000 
feet in length, and for purchase of necessary land. 
Princess Point Cutoff channel. 
General deepening, widening and straightening of channels and 
basins to provide 25-foot depth with additional overdepth 
at entrances, extend lower entrance breakwater, and necessary 
alteration or replacement of structures due to deepening channels. 
H. Doc. 446, 78th Cong., 
2d Sess. 
Sec. 107, 1960 River and 
and Harbor Act. 
S. Ex. Doc. 42, 35th Cong., 1st Sess. 
Annual Report 1866, p. 106. 
H. Doc. 272, 51st Cong., 2d Sess., 
and Annual Report 1887, p. 2950. 
Annual Report 1905, p. 2176. 
H. Doc. 588, 69th Cong., 2d Sess. 
Rivers and Harbors Committe 
Doc. 48, 74th Cong., 1st Sess. 
H. Doc. 282, 83rd Cong., 2d Sess. 
H. Doc. 142, 82nd Cong., 1st 
Sess.' 
Chief of Engineers. 
H. Doc. 328, 54th Cong., 2d Sess. 
Annual Report 1897, p. 2772, H. Doc. 
164, 55th Cong., 3d Sess. Annual 
Report, 1899, p. 1817. 
H. Doc. 62, 59th Cong., 2d Sess. and 
Rivers and Harbors Committee Doc. 3, 
59th Cong., 2d Sess. 
Rivers and Harbors Committee Doc. 
19, 74th Cong., 1st Sess. 
H. Doc. 750, 80th Cong., 2d Sess. 
H. Doc. 496, 87th Cong., 
2d Sess.' 
Annual Report, 1881, p. 2082 
H. Doc. 324, 60th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 43, 72d 
Cong., 1st Sess. 
S. Doc. 19, 86th Cong., 
1st Sess.' 
H. Ex. Doc. 105 49th Cong., 
2d Sess. and Annual Report 
1887, p. 1977. 
H. Doc 325, 60th Cong., 1st 
Sess. 
H. Doc. 835, 63rd Cong., 2d Sess. 
H. Doc. 55, 73rd Cong., 1st Sess.' 
31-48

TABLE 31-B (Continued) 
DETROIT, MI DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Nov. 17, 1986 
Aug. 5, 1886 
Jul. 13, 1892 
Jun. 13, 1902 
Mar. 2, 1919 
Jul. 3, 1930 
Aug. 30, 19333 
Mar. 21, 1956 
Aug. 30, 1935 
Oct. 23, 1962 
Oct. 27, 1965 
Mar. 2, 1945 
Mar. 2, 1867 
Mar. 3, 1899 
Mar. 2, 1907 
Dec. 31, 1970 
Jun. 25, 1910 
Aug. 17, 1966 
Mar. 2, 1867 
Sep. 19, 1890 
Jul. 25, 1912 
Jul. 3, 1920 
Mar. 2, 1945 
Jul. 14, 1960 
Mar. 2, 1907 
Deauthorization of the uncompleted portion of the project authorized 
by the 1935 River and Harbor Act. 
LAKE ST. CLAIR, MI, CHANNELS (See Section 30 of Text) 
Two Dikes. 
Deepening Canal and dredging Channel at Grosse Point. 
Second Canal for downbound vessels. 
21-foot depth in Grosse Pointe Channel for about 5.25 miles. 
25-foot depth through Canals and Channel through Lake St. Clair. 
Removal of Center Dike and widening 
Channel to 700 feet. 
Deepening Channel to 27.5 feet and abandonment of 
Channel above mouth of Southeast bend cutoff Channel. 
LELAND HARBOR, MI (See Section 31 of Text) 
Entrance Channel protected by Piers. 
Outer Breakwater, Anchorage Area. 
Approach Channel and removal of North Pier. 
LEXINGTON HARBOR, MI (See Section 32 of Text) 
Approach Channel and Maneuver Area 
Protected by Breakwaters.' 
LITTLE LAKE HARBOR, MI (See Section 33 of Text) 
12-Foot Deep Channel from Lake Superior into Little Lake 
Breakwaters and Revetments. 
LUDINGTON HARBOR, MI (See Section 34 of Text) 
Entrance Piers. 
Pier Extension Reconstruction and Repairs 
to Existing Structures and Present 
Project Dimensions of Channel. 
Breakwaters, Shore Connections, and 
Removal of Outer Ends of the Two Inner Piers. 
Deepen Channels and Widen Opening between Breakwaters. 
MACKINAC ISLAND HARBOR, MI (See Section 35 of Text) 
Original Breakwater. 30 
500-foot extension to East Breakwater. 
MANISTEE HARBOR, MI (See Section 36 of Text) 
Entrance Piers. 
Extending Channel 8,000 feet to connect with Manistee Lake, 
and further Pier extension. 
Depth of 20 feet in Outer Harbor 570 feet wide to Outer end of 
South Pier 18 feet deep in river, South Breakwater with shore 
connection, and extend North Pier if required. 
23-foot depths in entrance channel and 21-foot depths 
in River Channel. 
Remove old South Revetment, Construct new South Pier 
and Revetment, and widen river entrance Channel. 
Present Project dimensions of Channel through Outer Basin 
and River and Federal participation in cost of replacing 
Maple Street Bridge. 
MANITOWOC HARBOR, WI (See Section 37 of Text) 
Breakwaters. 
H.R.6 (formerly S. 1567) 
99th Cong., 2d Sess. 
(W.R.D.A. of 1986) 
Annual Report 1885, p. 2150. 
H. Doc. 297, 51st Cong., 2d Sess. 
H. Doc. 234, 56th Cong., 2d Sess. 
H. Doc. 188, 65th Cong., 1st Sess. 
H. Doc. 253, 70th Cong., 1st Sess. 
Rivers and Harbors Committee 
Doc. 3, 72nd Cong., 1st Sess. 
S. Doc. 71, 84th. Cong., 1st Sess.' 
Rivers and Harbors Committee 
Doc. 23, 74th Cong., 1st Sess. 
H. Doc. 413, 87th Cong., 2d Sess. 
H. Doc. 301, 88th Cong., 2d Sess.' 
H. Doc. 446, 78th Cong., 2d Sess.' 
Annual Report 1867, p. 11416 
H. Doc. 273, 54th Cong., 2d Sess. 
and Annual Report 1897, p 2951 
H. Doc. 62, 59th Cong., 1st Sess. 
and Rivers and Harbors 
Committee Doc. 3, 59th Cong., 
2d Sess.' 6 
H. Doc. 342, 91st Cong., 2d Sess.' 
H. Doc. 646, 56th Cong., 1st Sess. 
Section 107, 1960 River and 
Harbor Act. 
Annual Report 1867, p. 115 
Annual Report 1891, p. 2678 
H. Doc. 599, 62d Cong., 2d Sess. 
S. Doc. 131, 71st Cong., 2d Sess. 
H. Doc. 380, 77th Cong., 1st Sess. 
H. Doc. 358, 86th Cong., 2d Sess. 
H. Doc. 62, 59th Cong., Ist Sess., 
as modified by Rivers and Harbors 
Committee Doc. 3, 59th Cong., 
2d Sess. 
31-49

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 31-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 30, 1935"7 
Aug. 26, 1937 
Oct. 23, 1962 
Dec. 31, 1968 
(Sec. 107 of 1960 
R & H) 
Jun. 26, 1979 
Mar. 2, 1867 
Aug. 11, 1888 
Jun. 25, 1910 
Aug. 30, 1935' 
Jul. 11, 1960 
Mar. 3, 1871 
Jun. 13, 1902 
Mar. 4, 1913 
Jul. 3, 1930 
Aug. 30, 1935 
Mar. 2, 1945 
Jul. 14, 1960 
Jun. 27, 1967 
Sec. 107 
Aug. 30. 1852 
Mar. 3, 1883 
Mar. 2, 1907 
Sep. 22, 1922 
Aug. 30, 1935 
Mar. 2, 194518 
Jul. 14, 1960 
Oct- 23. 1962 
Feb. 24, 1835'9 
Present project dimensions of channel through outer basin, removal 
of old north stub pier, and approach channel to a proposed 
city terminal south of shore end of south breakwater. 
Channel in river. 
Deepen Lake approach to 25 feet by 800 feet wide, deepen outer 
harbor to 25 feet, river channel to 23 feet to 8th St., and 
Upper River Channel to 22 feet to Soo Line R.R. 
Dredge River Channel to 12 feet from Soo Line R.R. 
720 feet upstream 
Construct 765-Foot long stone Breakwater, and rubblemound 
bulkhead; construct 360-foot long entrance Breakwater; 
dredge 16,500 cubic yards for entrance channel. 
MARQUETTE HARBOR, MI (See Section 38 of Text) 
Breakwaters, 2,000 feet long. 
Extending the breakwater 1,000 feet. 
Additional 1,500-foot extension to breakwater and 
and removing a shoal in northerly part of harbor. 
Deepening harbor to 25 feet. 
Deepening harbor to 27 feet. 
MENOMINEE HARBOR AND RIVER, MI AND WI 
(See Section 39 of Text) 
Entrance piers. 
Consolidation of project for harbor and river, and a channel 
18 feet deep. 
Partial restoration of work above bridge which had been eliminated by 
Act of May 3, 1905. 
20-foot depth in channel and 18-foot depth in turning basin. 
21-foot depth in channel and turning basin and enlarge 
turning basin. 
Extend channel 12 feet deep to vicinity of Marinette Yacht Club. 
Deepen existing approach channel to 26 feet, entrance and river channels 
to 24 feet and enlarge turning basin. 
Deepen 1,100 feet of river channel generally north of 
Marinette Corp. facilities to 19 feet. 
MILWAUKEE HARBOR, WI (See Section 40 of Text) 
North pier.' 
Inner 7,600 feet of breakwater.'2 
South pier. Extending north breakwater 1,000 feet. 
Extend north breakwater: a south breakwater; present project 
dimensions of inner entrance channel. 
Dredging a portion of outer harbor to 21-foot depth. 
Dredging river channels to 21-foot depth. 
Deepen South Menominee and Burnham Canals to 21 feet. 
Deepen an approach channel to 30 feet by 800 feet wide and 
300 feet wide through breakwater: deepen entrance channel 
28 feet through piers, outer harbor to 28 feet south of entrance 
channel, and a channel to 27 feet in Milwaukee River to Buffalo St., 
and in Kinnickinnic River to Chicago & North Western Ry. bridges. 
MONROE HARBOR, MI (See Section 41 of Text) 
9-foot channel, protecting Revetments and Piers. 
Rivers and Harbors 
Committee Doc. 39, 73d 
Cong., 2d Sess. 
Rivers and Harbors 
Committee Doc. 80, 74th 
Cong., 2d Sess. 
H. Doc. 479, 87th Cong., 
2d Sess. 
Jun 1967 Detailed Project 
Report; Apr. 1982 
Supplement.' 
Sec. 107, 1960 
River and Harbor Act 
H. Ex. Doc. 56, 39th Cong., 
2d Sess. pts. 1 and 2, and Annual 
Report, 1866, pp. 8 and 77. 
Annual Report, 1889, pp. 272 
and 2021. 
H. Doc. 573, 61st Cong., 2d Sess. 
Rivers and Harbors Committee 
Doc. 20, 72d Cong., 1st Sess. 
H. Doc. 154, 86th Cong., 1st Sess.' 
Annual Report, 1867, P. 132. 
H. Doc. 419, 56th Cong., 1st Sess. 
H. Doc. 171, 70th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 28, 73d 
Cong., 2d Sess. 
H. Doc. 228, 76th Cong., 1st Sess. 
H. Doc. 112, 86th Cong., 1st Sess. 
Detailed Project Report 
Dec. 1960.' 
S. Doc. 175, 25th Cong., 2d Sess. 
Annual Report 1881, p. 2122. 
Annual Report 1906, p. 1752. (No 
prior survey or estimate affecting 
breakwater extensions.) 
H. Doc. 804, 66th Cong. 2d Sess. 
H. Doc. 289, 72d Cong. 1st Sess. 
S. Doc. 29, 76th Cong., 1st Sess. 
H. Doc. 285, 86th Cong., 2d Sess. 
H. Doc. 134, 87th Cong., Ist Sess.') 
Annual Report 1872. p. 237 
31-50

TABLE 31-B (Continued) 
DETROIT, MI DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Jul. 3, 1930 
Jul. 14, 193221 
Nov. 17, 1986 
Jun. 13, 1902 
Mar. 3, 1925 
Aug. 30, 1935 
Oct. 23, 1962 
Oct. 23, 1962 
Jun. 25, 1910 
Aug. 26, 1937 
Oct. 23, 1962 
Nov. 17, 1986 
Mar. 2, 1867 
Mar. 3, 1873 
Jul. 5, 1881 
Jul.13, 1892 
Mar. 25, 1907 
Mar. 2, 1945 
Mar. 3, 1879 
Mar. 2, 1945 
Jul. 16, 1984 
Mar. 2, 1945 
Jun. 3, 1896 
Jun. 13, 1902 
Aug. 30, 1935 
21-foot channel, dikes and Turning Basin. 20 
Modified Conditions of Local Cooperation 
imposed by Act. of Jul. 3, 1930 
Deepen portion of existing navigation channel to 27 feet; deepen lake 
channel to 28 feet; widen the channel from 200 to 500 feet; dredge 
a new turning basin 24 feet deep, 1,600 feet wide at river's mouth; 
and construct a 190 acre CDF in Plum Creek Bay to enable creation of a 
700 acre marsh behind the CDF. 
MUSKEGON HARBOR, MI (See Section 42 of Text) 
Piers and Revetments. 
Breakwaters. 
Repairing Revetments around Car Ferry Slip. 
Channel deepening and present project dimensions of channel. 
Piers and Revetments. 
NEW BUFFALO HARBOR, MI (See Section 43 of Text) 
Entrance channel 10 feet deep by 80 to 180 feet wide and 850 feet long 
to mouth of Galien River, new no. and so. breakwaters 1,305 and 
740 feet, respectively, deepening inner channel to Galien River to 
8 feet and 80 feet wide and 1,250 feet long. 
ONTONAGON HARBOR, MI (See Section 44 of Text) 
Channel 17 feet deep and 150 feet wide through bar and 
15 feet deep and 100 feet wide between piers, and pier 
maintenance. 
Modified project widths and provide inner basin. 
Enlarging and deepening the existing harbor basin. 
Deauthorization of the turning basin feature of the project authorized 
by the 1962 River and Harbor Act. 
PENTWATER HARBOR, MI (See Section 45 of Text) 
Piers and revetments, dredging. 
Piers and revetments, dredging. 
Piers and revetments, dredging. 
Piers and revetments, dredging. 
Present project depth of channel. 
POINT LOOKOUT HARBOR (AU GRES RIVER), MI 
(See Section 46 of Text) 
Breakwater, Anchorage Area, Channel Dredging. 
PORTAGE LAKE HARBOR, MI (See Section 47 of Text) 
Entrance Channel 18 feet deep protected by Piers and Revetments. 
PORT AUSTIN HARBOR, MI (See Section 48 of Text) 
Breakwater, Anchorage Basin, Channel Dredging. 
Construct a breakwater access for recreation purposes. 
PORT SANILAC HARBOR, MI (See Section 49 of Text) 
Entrance Channel 12 feet deep, Anchorage Basin, Breakwater. 
PRESQUE ISLE HARBOR, MI (See Section 50 of Text) 
Breakwater, 1,00 feet long. 
Shore extension, 216 feet long. 
For dredging and rubblemound extension to breakwater 1,600 feet long. 
Changed designation of project. 
31-51 
Rivers and Harbors Comm. 
Doc. 22, 71st Cong., 1st Sess. 
Rivers and Harbor Comm. Doc. 
12, 72d Cong., 1st Sess. 45, 
75th Cong., 1st Sess.' 
H.R.6 (formerly S. 1567), 
99th Cong., 2d Sess. 
(W.R.D.A. of 1986) 
H. Doc. 104, 56th Cong. 2d Sess. 
H. Doc. 494, 67th Cong. 4th Sess. 
Rivers and Harbor Comm. Doc. 64, 
75th Cong., 1st Sess.' 
H. Doc. 474, 87th Cong., 2d Sess.' 
H. Doc. 474, 87th Cong. 2d Sess. 
H. Doc. 602, 61st Cong., 2d Sess. 
S. Committee print, 74th 
Cong., 2d Sess. 
H. Doc. 287, 87th Cong., 2d Sess. 
H.R.6 (formerly S. 1567), 
99th Cong., 2d Sess. 
(W.R.D.A. of 1986) 
H. Ex. Doc. 70, 39th Cong., 2d Sess. 
H. Ex. Doc. 70, 39th Cong., 2d Sess. 
H. Ex. Doc. 70, 39th Cong., 2d Sess. 
H. Ex. Doc. 70, 39th Cong., 2d Sess. 
H. Doc. 181, 39th Cong., 2d Sess. 
H. Doc. 446, 78th Cong., 2d Sess. 
Annual Report 1879, p. 163422 
H. Doc. 446, 78th Cong., 2d Sess. 
H.R. 5653, 98th Cong., 2d Sess., 
P.L. 98-360 (98 Stat. 405) Sec. 106. 
H. Doc. 446, 78th Cong., 2d Sess. 
H. Doc. 318, 54th Cong.. 1st 
Sess., Annual Report for 
1903, pp. 474, 1823. 
H. Doc. 473. 72nd Cong., 2d Sess.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 31-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Jul. 14, 1960 
Aug. 8, 1917 
Aug. 30, 19352.26,27 
Jul. 3, 19582 
Oct. 23, 19622 
Jun. 25, 1910 
Jul. 3, 1930 
Aug. 26, 1937 
Jun. 20, 1938 
Sep. 3, 1954 
Oct. 23, 1962 
Oct. 27, 1965 
Jul. 13, 1892 
Jul. 8, 1930 
Mar. 2, 1945 
Jul. 24, 1946 
Mar. 21, 1956 
Nov. 17, 1986 
Mar. 3, 1875 
Jun. 14, 1880 
Mar. 3, 1899 
Aug. 30, 1935 
Jun. 2, 1937 
Mar. 2, 1945 
Jul. 3, 1958 
Deepening harbor from 26 and 28 feet to 28 and 30 feet, respectively 
ROUGE RIVER, MI (See Section 51 of Text) 
21-foot channel via the Shortcut Canal. 
25-foot channel at mouth of Old Channel, 1,425 feet long and 
adjacent to latter, and 21-foot channel extending from junction 
of Old Channel and Shortcut Canal into Old Channel to Detroit, 
Toledo & Ironton R.R. Bridge. 
Old Channel; 100 feet wide from Peerless Cement Corp. to 
Junction with Shortcut Canal widened to 150 feet at 2 bends. 
25-foot channel over modified limits from 
Detroit River to Jefferson Ave. (via Shortcut Canal). 
SAGINAW RIVER, MI (See Section 52 of Text) 
Channel 200 feet wide, with depth of 18.5 
feet in Bay and 16.5 feet in River. 
Project Depth of 18.5 feet extended up River 
to Saginaw 
Turning Basin. 
Present Project Channel Dimensions from Bay to 
Sixth Street Bridge in Saginaw 
New Channel in Bay, 350 feet wide and 24 feet deep from 
24-foot contour to River Mouth, Project Depth of 24 feet 
in River Channel up to Detroit & Mackinac Railway Bridge, 
Project Depth of 22 feet in River Channel up to Sixth Street 
Bridge, Turning Basins at Essexville and Carrollton, and 
elimination of present Channel in Bay. 
Deepen Bay Channel, Deepen River Channel to Detroit & 
Mackinac Bridge, Extend 22-foot Project above 6th St. 
Bridge, Deepen Essexville Turning Basin, and Construct 
2 new Turning Basins. 3 
Deepen River Channel to 25 feet, from Detroit & Mackinac Bridge 
to New York Central Railroad Bridge. 
ST. CLAIR RIVER, MI (See Section 53 of Text) 
20-foot Channel in the River. 
Deepen Channel to 25 and 26 feet, and 
Compensating Works. 
Widening Channel at Southeast Bend to 700 feet. 
Widen and deepen Southeast Bend and improve Outlet 
of North Channel, St. Clair River. 
Deepen and further improve Channels in St. Clair River 
between limits of 27.1 to 30 feet to provide safe navigation by 
vessels with drafts of 25.5 feet. A cutoff Channel in Canada of 
Southeast Bend and abandon old Southeast Bend Channels. 
Deauthorization of the work authorized by the River and Harbor Act 
of Jul. 24, 1946 
ST. JOSEPH HARBOR, MI (See Section 54 of Text) 
Interior Revetments. 28 
Benton Harbor Canal. 28 
Present Project dimensions of Piers 
and a Turning Basin. 
Present project dimensions of 
Paw Paw River. 
Abandon easterly 1,000 feet of Channel above West Line of 9th St. 
Turning Basin above mouth of Morrison Channel 
and eliminate Turning Basin near mouth of Paw Paw River. 
Maintenance of Turning Basin near mouth of Paw Paw River. 
H. Doc. 145, 86th Cong., 1st Sess. 
H. Doc. 1063, 64th Cong., 2d Sess. 2 5 
H. Doc. 125, 85th Cong., 1st Sess. 
H. Doc. 509, 87th Cong., 2d Sess.' 
H. Doc. 740, 61st Cong., 2d Sess. 
Rivers and Harbors Committee 
Doc. 30, 71st Cng. 2d Sess. 
Rivers and Harbors Comm. Doc. 21, 
75th Cong., Ist Sess. 
H. Doc. 576, 75th Cong., 3d Sess. 
H. Doc. 500, 83rd Cong., 2d Sess. 
H. Doc. 554, 87th Cong., 2d Sess. 
H. Doc. 240, 89th Cong., 1st Sess.' 
H. Doc. 207, 51st Cong., 2d Sess. 
H. Doc. 253, 70th Cong., 1st Sess. 
H. Doc. 309, 77th Cong., 1st Sess. 
H. Doc. 335, 80th Cong., 1st Sess. 
S. Doc. 71, 84th Cong., 1st Sess. 
H.R.6 (formerly S. 1567), 
99th Cong., 2d Sess. 
(W.R.D.A. of 1986) 
H. Ex. Doc. 160, 43rd Cong., 
2d Sess., and Annual Report 1875, 
pt. 1, p. 162 
Annual Report 1880, pp. 2030, 2031 
and 2049, 2055. 
H. Doc. 307, 55th Cong., 2d Sess., 
and Annual Report 1898, p. 2496. 
Rivers and Harbors Comm. Doc. 52, 
74th Cong., 1st Sess. 
H. Doc. 129, 76th Cong., 1st Sess. 
S. Doc. 95, 84th Cong., 2d Sess.' 
31-52

TABLE 31-B (Continued) 
DETROIT, MI DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Jul. 11, 1870 
Aug. 5, 1886 
Jul. 13, 1892 
Jun. 13, 1902 
Jun. 13, 1902 
Mar. 3, 1907 
Mar. 3, 1909 
Jul. 25, 1912 
Mar. 4, 1915 
Sep. 22; 1922 
Jan. 21, 1927 
Jul. 3, 1930 
Jun. 26, 19349 
Aug. 30, 1935 
Mar. 7, 1942 
Jun. 15, 1943 
Mar. 2, 1945 
Jul. 24, 1946 
Mar. 21, 1956 
Jul. 9, 1956 
Nov. 17, 1986 
ST. MARYS RIVER, MI (See Section 55 of Text) 
Weitzel Lock (Replaced in 1943 by MacArthur Lock), 
widen and deepen existing State Channel.28 
Poe Lock.' 
Dredging through shoals above falls and shoals below falls between lower 
end of Canal and upper entrance Channel into Lake Nicolet (formerly 
Hay Lake). 
Enlarging the Old Channel. 
Lake Nicolet and Neebish Channels work in that section of River below 
Locks. 
David Lock Second Canal, and Emergency Dam. 
Lease of Waterpower at Falls. Lease entered into with Michigan Northern 
Power Co. provided for construction of remedial and compensating works. 
Fourth Lock (Renamed 'Sabin' Lock in 1943). 
Deepen Tailrace of Power Plant. 
Widen upper approach to Canals through Vidal Shoals, extend anchorage 
and maneuver area below Locks. 
Remove Round Island, middle ground extension of Northwest Canal 
Pier, and widen Channels Middle Neebish Route. 
Deepen Channels throughout downbound Route. 
Operation and Care of Canal and Locks provided from War 
Department Appropriations for Rivers and Harbors. 
Widen Brush Point Turn and Channel from Brush Point 
to Point Louise. 
Construct new (MacArthur) Lock on site of former Weitzel Lock, 
deepen approach Channels to 27 feet, and reconstruct approach Piers. 
Name 'MacArthur' Lock and changed name of 'Fourth' 
Lock to 'Sabin' Lock. 
Remove Bridge Island and construct new Hydroelectric 
Power Plant. 
Replace Poe Lock at St. Marys Falls Canal with a new structure 
800 feet long, 100 feet wide and 32 feet deep with necessary 
construction of Nose and Center Piers, and widen and deepen Channel 
across Point Iroquois Shoals and in Lake Nicolet to provide wider 
anchorage and maneuver areas in St. Marys River. 
Deepen to provide a Project Safe Draft of 25.5 feet over full width to 
downbound and 2-way Channels (including anchorage areas) 
and over Westerly 300-foot width of upbound Middle Neebish Channel, 
when levels of Lake Superior and Huron are at their respective 
low-water datum. 
Repeal Authorization of Bridge as a part of Project, authorize 
alteration with cost to be apportioned by Sec. 6, Truman Hobbs Act, 
June 21, 1940. 
Construct a second lock 1,294 feet in length, 115 feet in width, and 
32 feet in depth, adjacent to the existing lock. The replacement lock 
is to be located in the North Canal of the St. Marys Falls Canal at 
Sault Ste. Marie, MI, on the site of the existing Davis and Sabin Locks. 
SAUGATUCK HARBOR AND KALAMAZOO RIVER, MI 
(See Section 56 of Text) 
Entrance Channel, Piers and Revetments. 
Deepening entrance to 16 feet. 
Deepening Channel in River to 14 feet. 
SAXON HARBOR, WI (See Section 57 of Text) 
Provides for east and west breakwaters, an outer channel 10 feet deep, 
an inner basin and side channel 8 feet deep, and diversion of 
Oronto Creek to Parkers Creek by three short reaches of 
channel excavation and a levee. 
31-53 
Report by Maj. O. M. Poe, Corps of 
Engineers, not published. 
H. Ex. Doc. 72, 49th Cong., 2d Sess. 
H. Ex. Doc. 207, 51st Cong., 2d Sess. 
and Annual Report 1891, p. 2810 
H. Doc. 138, 56th Cong., 2d Sess., 
and 215, 58th Cong., 3d Sess. 
H. Doc. 128, 56th Cong., 2d Sess. 
H. Doc. 333, 59th Cong., 2d Sess. 
(Plan 3) 
H. Doc. 65, 62d Cong., 1st Sess. 
District Engineer Report, 
Oct. 29, 1920. 
H. Doc. 270, 69th Cong., 1st Sess. 
H. Doc. 253, 70th Cong., 1st Sess. 
River and Harbor Comm. Doc. 53, 
74th Cong., 1st Sess. 
H. Doc. 218, 77th Cong., 1st Sess. 
H. Doc. 679, 78th Cong., 2d Sess. 
and H. Doc. 339, 77th Cong., 1st Sess. 
H. Doc. 335, 80th Cong., 1st Sess. 
S. Doc. 71, 84th Cong., 1st Sess.' 
None 
H.R.6 (formerly S. 1567), 
99th Cong., 2d Sess. 
(W.R.D.A. of 1986) 
H. Doc. 912, 54th Cong., 1st Sess. 
Annual Report 1896, Vol. 2. 
Pt. 5, p. 2739 
Annual Report 1907, p. 6416 
H. Doc. 635, 61st Cong., 2d Sess. 
River and Harbor Act 
H. Doc. 169, 85th Cong., Ist Sess.,' 
Annual Report for 1965, p. 1025. 
Jun. 3, 1896 
Mar. 2, 1907 
Jun. 25, 1910 
Jul. 3, 1958

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 31-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Jun. 3, 1896 
Mar. 2, 1907 
Jan. 21, 1927 
Aug. 30, 1935 
Sep. 3, 1954 
Aug. 11, 1888 
Mar. 3, 1905 
Aug. 30, 1935 
Mar. 3, 1873 
Jul. 13, 1892 
Aug. 5, 1886 
Aug. 5, 1886 
Aug. 30, 1935 
Nov. 7, 1945 
Jul. 14, 1960 
Mar. 3, 1871 
Mar. 2, 1907 
Aug. 30, 1935 
Jul. 3, 1958 
Mar. 2, 1867 
Mar. 3, 1873 
Jul. 5, 1884 
Jul. 13, 1892 
Mar. 2, 1907 
Apr. 7, 1966 
Nov. 17, 1986 
SEBEWAING RIVER, MI (See Section 58 of Text) 
Entrance Channel 8 feet deep, 100 feet wide and 15,000 feet long 
in Saginaw Bay. 
SHEBOYGAN HARBOR, WI (See Section 59 of Text) 
North breakwater. 
Preserving south pier as part of project, providing turning basin, and 
and elimination of proposed south breakwaters. 
Present project dimensions of channel. 
Widen and deepen outer harbor entrance channel to 450 feet, widen 
and deepen river channel from present project limit to north side of 
Jefferson Ave. 
SOUTH HAVEN HARBOR, MI (See Section 60 of Text) 
Channel from Inner End of Piers to Highway Bridge.12 
Present dimensions of Piers and for a Turning Basin. 
Present Project dimensions of Channel and Turning Basin. 
STURGEON BAY AND LAKE MICHIGAN SHIP CANAL, WI 
(See Section 61 of Text) 
Breakwaters. 12 
Acquisition of the canal. 
TWO HARBORS, MN (See Section 62 of Text) 
Breakwater and dredging. 
Construction of two breakwater piers. 
Shore connection to east breakwater and dredign maneuvering area. 
Construct new east breakwater and enlargement of maneuvering basin. 
Deepen harbor project depths from 26 and 28 feet to 28 and 30 feet, 
respectively. 
TWO RIVERS HARBOR, WI (See Section 63 of Text) 
South pier, 750 feet of north pier, and about 44 feet of 
north revetment. 12 
Remainder of north pier and stilling basin. 
Deepening entrance channel and inner basin to 18 feet. 
Extend existing project in West Twin River to 18 feet deep 
and in East Twin River to 10 feet deep to 22d Street Bridge. 
WHITE LAKE HARBOR, MI (See Section 64 of Text) 
New Channel, with Piers and Revetments. 
New Channel, with Piers and Revetments. 
New Channel, with Piers and Revetments. 
New Channel, with Piers and Revetments. 
Present Project Depth of Channel. 
KAWKAWLIN RIVER, MI (See Section 72 of Text) 
Deepening River Channel, altering Railway Bridge, 
Riprapping portions of Channel bottom, and utility relocations. 
Provides that the Federal share of the cost of operation and maintenance 
of the project shall be 50 percent. 
H. Doc. 71, 54th Cong., 1st Ses. 
H. Doc. 62, 59th Cong. 1st Sess. 
H. Doc. 475, 68th Cong., 2d Sess. 
Rivers and Harbors Committee 
Doc. 47, 74th Cong., 1st Sess. 
H. Doc. 554, 82d Cong., 2d Sess.' 
No Prior Survey or Estimate. 
H. Doc. 119, 58th Cong., 2d Sess. 
Rivers and Harbors Comm. Doc. 9, 
73d Cong., 1st Sess.' and 
unpublished review Report of Chief of 
Engineers, Dated Dec. 21, 1934. 
H. Ex. Doc. 34, 42d Cong., 2d Sess. 
Annual Report, 1872, p. 171. 
H. Ex. Doc. 106, 49th Cong., 2d Sess. 
H.Ex.Doc. 94, 48th Cong., 
2d Sess. 
Annual Report for 1887, p. 1952 
Rivers and Harbors 
Comm. Doc. 17. 
72d Cong., 1st Sess. 
H.Doc. 805, 78th 
Cong., 2d Sess. 
H.Doc. 146, 86th 
Cong., 1st Sess' 
Annual Report, 1871, p. 123 (as 
modified by Chief of Engineers, 
Feb. 27, 1897). 
H. Doc. 730, 59th Cong., 1st Sess. 
Modification of Plan A. 
Rivers and Harbors Committee 
Doc. 25, 73d Cong., 2d Sess. 
H. Doc. 362, 84th Cong., 2d Sess.' 
Unpublished Survey Report of 1868. 
Unpublished Survey Report of 1868. 
Unpublished Survey Report of 1868. 
No Prior Survey or Estimate. 29 
Section 205, 1948 Flood Control Act. 
H.R.6 (formerly S. 1567), 
99th Cong., 2d Sess. 
(Sec. 837 of W.R.D.A. of 1986) 
31-54

TABLE 31-B (Continued) 
DETROIT, MI DISTRICT 
AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
PAW PAW LAKE, MI (See Section 73 of Text) 
Jul. 23, 1985 Construct a gated control structure at the Paw Paw Lake outlet; Section 205, 1948 
a 1,722 foot long, 72-inch reinforced concrete drainage from the Flood Control Act 
Lake to Paw Paw River; entrance and exit structures to improve 
efficiency and provide protection; and two small levees. 
RED RUN DRAIN-LOWER CLINTON RIVER, MI 
(See Section 74 of Text) 
Dec. 30, 1970 Flood control and major drainage improvements to Red Run Drain H.Doc. 431, 91st Cong., 2d Sess. 
and Lower Clinton River. 
Nov. 17, 1986 Deauthorization of project authorized by the Flood Control Act of 1970. H.R.6 (formerly S. 1567), 
99th Cong., 2d Sess. 
(W.R.D.A. of 1986) 
SAGINAW RIVER, MI FLOOD CONTROL 
(See Section 75 of Text) 
Jul. 3, 1958 Flood Control improvements to Saginaw River and its tributaries H. Doc. 346, 84th Cong., 2d Sess.' 
including Tittabawassee, Shiawassee, Flint, and Cass Rivers. 
SEBEWAING, SEBEWAING RIVER, MI 
(See Section 76 of Text) 
Aug. 18, 1941 Enlarging present Channel of Sebewaing River, altering Railroad and H. Doc. 286, 76th Cong., 1st Sess.' 
Highway Bridges, removal of Dike. 
'Contains latest published map. 
2Including Emergency Relief Administration Work authorized 
May 28, 1935, 
3Included in Public Works Administration Program 
September 6, 1933. 
4This modification deauthorized August 5, 1977 under Section 
12, Public Law 93-251. 
SAdministrative Act, Section 4. 
'Public Law 568, 82d Congress. 
7Public Law 388, 87th Congress. 
8This portion inactive. 
9Permanent Appropriations Repeal Act. 
' Transfer completed June 1962. 
"Amended 1868, 1879, 1892. 
'2Completed under previous project. 
'3Included in Public Works Administration Program 
January 3, 1934. 
14Inactive portion; removal of 200 linear feet of north pier, 
widening inner 200 feet of channel through outer basin, and closing 
gap in north shore connection of breakwater. 
'SLatest published map is in Annual Report 1914, p. 2974. 
'6Latest published map in Annual Report 1914, p. 2914. 
'7Superceded by Act of October 23, 1962. 
'8Uncompleted portion was deauthorized in 1977 (dredging 
Milwaukee River from Buffalo St. Bridge to North Humboldt Ave. 
Bridge). 
'9Modified by Act of June 10, 1872. 
20Riprapping of protectipg dikes portion of project is inactive. 
21War Department Appropriations Act. 
22Latest published map is in House Document 588, 64th Cong., 
1st Sess. 23Work recommended in H. Doc. 588, 64th Cong., 1st Sess. 
24Deauthorized in 1977. 
25Contains latest published maps. See also map with Rivers and 
Harbors Committee Doc. 19, 72d Cong., 1st Sess. 
26Except for dredging 25-foot channel to 1,150 feet upstream of 
mouth in old channel, work authorized in this Act is considered 
inactive. 
27This modification deauthorized August 5, 1977 under Section 
12, Public Law 93-251. 
28 Completed under previous projects. Public Law 130, 75th 
Cong., 1st Sess. 29Latest published map is in H. Doc. 2053, 64th Cong., 
2d Sess. 
30Project complete except for Work Authorized by River and 
Harbor Act of 1950. 
31-55

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 31-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation & 
Project Status Report for Construction Maintenance 
Alpena Harbor, MI Completed 1985 337,394' 919.784 
Algoma Harbor, WI Completed 1981 205,0102 920,817 
Ausable Harbor, MI Completed 1985 209,776; 2,474,868 
Bayfield Harbor, WI Completed 1979 183,855 80,398 
Bayport Harbor, MI Completed 1975 93,597 53,985 
Belle River, MI Completed 1980 24,301 74,696 
Beaver Bay, MN Active 1982 293,000 2,818 
Big Suamico Harbor, WI Completed 1986 (20,243) 191,919 
Black River (Alcona Co), MI Inactive 1907 0 0 
Black River (P.H.), MI Inactive 1985 830,1654 512,4415 
Cedar River Harbor, MI Active 1982 215,000 0 
Chnls. in the Straits of Mackinac, MI Completed 1984 2,832,629 180,208 
Chippewa Harbor, Isle Royale, MI Completed 1959 125,629 13,528 
Cornucopia Harbor, WI Completed 1986 462,653 834,366 
Cross Village, MI Active 1983 364,000 0 
Eagle Harbor, MI Completed 1985 205,1646 85,418 
Grand Marais Harbor, MI Completed 1980 1,055,871 1,709,536 
Grays Reef Passage, MI Completed 1970 190,521 657,856 
Greilickville Harbor, MI Completed 1976 366,579 125,680 
(Formerly Traverse City Harbor, MI) 
Kawkawlin River, MI Completed 1986 0 241,700 
Knife River Harbor, MN Active 1986 412,945 282,474 
Lac La Belle Harbor, MI Completed 1985 269,270 480,384 
La Pointe Harbor, WI Completed 1986 139,874 92,639 
Les Cheneaux Islands Channels, MI Completed 1980 399,478 319,802 
Little Bay DeNoc, Gladstone Harbor, MI Completed 1966 332,832 79,432 
Lutsen Harbor, MN Active 1982 357,000 0 
Mackinaw City Harbor, MI Completed 1986 136,2867 79,935 
Manistique Harbor, MI Completed 1985 1,299,3558 2,187,127 
Northport Harbor, WI Inactive 0 0 
Oconto Harbor, WI Completed 1985 130,754' 1,116,94010 
Pensaukee Harbor, WI Completed 1986 0 13,193 
Petoskey Harbor, MI Completed 1986 123,839 545,508 
Pine River, MI Completed 1980 13,649 33,831 
Port Washington Harbor, WI Completed 1986 2,582,204" 2,438,88412 
Port Wing Harbor, WI Completed 1986 63,393 794,585 
St. James, Beaver Island, MI Completed 1957 49,171' 55,847 
St. Joseph River, MI Completed 1975 54,555 19,185 
Tawas Bay Harbor, MI Completed 1986 1,954,821 22,623 
Washington Island, WI Completed 1950 62,838 71,368 
Whitefish Pointe, MI Completed 1981 771,639 229,368 
'Includes $18,889 for previous projects. 8Includes $3,955 for previous projects. 
2Includes $92,774 for previous projects. "Includes $84,569 for previous projects. 
3Includes $114,786 for previous projects. 'oIlncludes $8,161 for previous projects. 
4Includes $85,849 for previous projects. ''Includes $188,495 for previous projects. 
Sincludes $12,008 for maintenance previous. 12Includes $15,123 for previous projects. 
6 Excludes $27,800 for previous projects. 13Excludes Contributed Funds of $7,500. 
7 Excludes $136,286 Contributed Funds. 
31-56

TABLE 31-E 
DETROIT, MI DISTRICT 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to September 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Grand River, Grandville, MI' Inactive 1966 -- 
Grand River, Lansing, MI Inactive 1971 7,300 
Kalamazoo River (Battle Creek) MI2 Deferred 1975 4,471,235 
Kalamazoo River (Kalamazoo) MI Active 1975 421,466 
Mount Clemens, Clinton River, MI3 Completed 1953 1,136,0084 
Upper River Rouge, MI5 Inactive 1968 7,935 
River Rouge, MI Completed 1981 31,960,332 
'Awaiting Appropriation of Funds. 4Includes $202,996 Contributed Funds. 
Zlncludes $108,335 Contributed Funds. 5Planning indefinitely suspended due to lack of local 
3Completed. cooperation. 
TABLE 31-F MULTIPLE PURPOSE PROJECTS, INCLUDING POWER 
ST. MARYS RIVER, MI: EXISTING PROJECT 
(SEE SECTION 55 OF TEXT) 
Lock Davis Sabin MacArthur New Poe 
Miles Above Mouth 47 47 47 47 
Clear Width of Chamber Feet 80 80 80 110 
Length Between Gate Quoins Feet 1,350 1,350 800 1,200 
Lifts Feet 21.7 21.7 21.7 21.7 
Depth Over Upper Breast Walls' Feet 24.3 24.3 31 32 
Depth Over Lower Breast Walls' Feet 23.1 23.1 31 32 
Foundation Rock Rock Rock Rock 
Type of Construction Concrete Concrete Concrete Concrete 
Estimated Cost $6,200,0002 $3,275,0003 $12,909,440 $39,000,000 
Actual Cost $2,200,0005 $1,750,0006 $12,718,8064,7 $34,813,066 
Completed (Open to Commerce) Oct. 21, 1914 Sep. 18, 1919 Jul. 11, 1943 Jun. 26, 1969 
Emergency Dam for South Canal North Canal 
Miles Above Mouth 47 47 
Estimated Cost -9 $300,000 
Type Steel Stoplogs Recessed Steel Stoplogs Recessed 
Into Lock Masonry Into Lock Masonry 
Cost Completed -9 $169,2248 
Year Completed 1943 1922 (Modified 1963) 
'At low water datum 599.5 above and 577.8 below. 
2Includes Cost of North Canal. 
3Includes cost of canal excavations to provide necessary approaches 
to lock, canal walls, piers, and emergency dam, 
$662,919. 
4Excludes cost of deepening and enlarging South Canal, 
$1,653,378. 
5Excludes cost of North Canal, $2,572,611. 
6Excludes cost of canal excavations to provide necessary approaches 
to lock, canal walls, piers, and emergency dam, 
$662,919. 
7Excluding cost of lower guard gates which were never 
installed. 
8Including engineering office, and inspection. 
9Not separable from cost of locks. 
Note: Limiting draft to locks is determined by depth over breast walls. 
31-57

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 31-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See 4nnual Date Funds Funds 
Project Report For Deauthorized Expended Expended 
Berrien County, MI 1963 Nov. 1986 0 0 
(St. Joseph Shore) beach erosion control 
(1958 Flood Control Act) 
Black River Harbor, MI 1976 Nov. 1977 0 0 
(Aug. 30, 1935 R&1 Act) 
Detroit River, Trenton Chnl., MI 1976 Aug. 1977 0 0 
(May 17, 1950 R&H Act) 
Forestville Harbor, MI 1969 Nov. 1986 0 0 
(1968 R&H Act) 
Grand Haven Harbor, MI 1976 Nov. 1977 0 0 
(Mar. 2, 1945 R&H Act) 
Grand River at Grandville, MI 1966 Nov. 1977 0 0 
(Oct. 27, 1965 Flood Control Act) 
Kewaunee River, WI 1976 Aug. 1977 0 0 
(1960 R&H Act) 
Lansing, (Grand River), MI 1971 Jun. 1981 7,000 0 
(Jul. 3, 1958 Flood Control Act) 
Pentwater Harbor, MI 1976 Nov. 1977 0 0 
(Jul. 13, 1892 R&H Act) 
Racine Harbor, WI 1963 May 1986 9,441,554 0 
(Mar. 2, 1907; Aug. 26, 1937; Mar. 2, 1945, R&H Acts 
and Section 107 of the 1960 R&H Act) 
Red Run Drain, Lower Clinton River, MI 1983 Nov. 1986 3,823,000 0 
(1970 Flood Control Act) 
Rogers City Harbor, MI 1926 Aug 1977 5,892 0 
(Jun. 25, 1910 R&H Act) 
Rouge River, MI 1976 Aug. 1977 22,000 0 
(Oct. 23, 1962 R&H Act) 
Rouge River, MI 1976 Aug. 1977 12,000 0 
(Jul. 3, 1958 R&H Act) 
Rouge River, MI 1976 Aug. 1977 0 0 
(Aug. 30, 1935 R&H Act) 
St. Clair River Compensating Works, MI 1976 Aug 1977 0 0 
(Jul. 3, 1930 R&H Act) 
South Milwaukee Harbor, WI 1906 Aug. 1977 0 0 
(1836 Flood Control Act) 
St. Marys River (MacArthur Lock Guard Gates), MI 1977 Oct. 1978 0 0 
(Mar. 7, 1942 R&H Act) 
31-58

TABLE 31-H 
DETROIT, MI DISTRICT 
FEATURES OF EXISTING PROJECT 
Project 
Datum Planes 
Length Miles Used by Above Mean 
of from Upbound Water Level 
Channel Mouth or Down- Project Project at Father 
of bound Width Depth Point,Quebec Year 
Name of Channel (Feet) River Vessels (Feet) (Feet) (Feet) Complete 
DETROIT RIVER, MI (SEE SECTION 12 OF TEXT) 
Channel North of Belle Isle 1,2 
Channel at Head of Detroit River 
Miscellaneous Shoals and Obstructions 
Belle Isle to Fighting Island Channel 
Fighting Island Channel 
Ballards Reef Channel North of Junction 
with Livingstone Channel 
Livingstone Channel Upper 
Livingstone Channel Lower: 
CS 260+00 to 368+87 
CS 368+87 to 492+00 
East Outer Channel 
Misc., Shoals and Obstructions, 
Detroit River to Pelee Passage 
Pelee Passage Shoal 
Amherstburg Channel: 
Upper Section, Ballards Reef Channel 
Middle Section 
Lower Section, Hackett Range 
West Outer Channel 
Trenton Channel: 
Wyandotte Reach 
Trenton Reach (Upper) 
Trenton Reach (Lower) 
Grosse Ile Shoal 
.30 
38,800 32 
44,500 25 
24,800 17 
12,200 12 
Both 
Both 
Both 
Both 
Both 
26,000 10 Down 
10,887 
12,313 
42,000 
5 Down 
Both 
Both 
- - Both 
- - Both 
6,500 
12,000 
24,000 
21,000 
31,500 
5,100 
600 
600 
10 Up 
- Up 
- Up 
- Down 
17 
14 
14 
Local 
Local 
Local 
Local 
200 21.0 571.3 
800 28.5 571.5-570.9 
- 28.5 570.9-570.3 
800 28.5 
600 28.5 
569.8 
569.8 
450 27.7 5.69.8-568.6 
450,800 
800-1,200 
1,200 
29.0 
29.0 
28.5 
568.6 
568.6 
568.6 
- 28.5-29.53 568.6 
- 29.5 568.6 
600 
600 
6000 
800 
300 
300 
250-300 
27.5 
21.27.54 
21.28.55 
22.0 
27.0 
28.0 
28.0 
20.0 
569.8-569.5 
569.5-568.9 
568.9-568.6 
568.6 
569.9-569.7 
569.7-569.6 
569.6-568.8 
569.8 
ST. CLAIR RIVER MI (SEE SECTION 53 OF TEXT) 
Channel at Foot of Lake Huron 
Channel North of Blue Water Bridge 
Port Huron to Stag Island 
Widening at Upper and Lower 
Ends of Stag Island 
St. Clair to Russel Island 
Russel Island to Southeast Bend 
Southeast Bend CS 324+00 to 250+00 
Cutoff Channel 
North Channel Outlet 
26,500 44 
4,100 39 
38,000 
37,600 
77,000 
20,600 
7,400 
30,300 
8,000 
39 
31 
24 
11 
5 
Both 
Both 
Both 
Both 
Both 
Both 
Both 
Both 
Small 
Craft 
800 
800 
800 
900-1,000 
1,000 
700-1,000 
700 
700 
100 
30.0 576.8-576.5 
30.0 576.4-576.1 
30.0 
27.4 
27.3 
17.2 
27.1 
27.1 
10.0 
576.4-576.1 
574.9-573.8 
573.8-572.4 
572.4-572.1 
573.1-572.0 
572.1-571.7 
571.7 
'This is a Side Channel. 
2Extends from Deep Water Near Windmill Point to a Point Opposite 
Fairview Slip, about 3,000 Feet. 
3Project Depth 29.5 feet over Rock Shoals and 28.5 feet over 
other than Rock Shoals. 
4 Project Depth 21 feet in Easterly 300-foot width of Channel 
and 27.5 feet in Westerly 300-foot width. 
5Project Depth 21 feet in Easterly 300-foot width of Channel 
and 28.5 feet in Westerly 300-foot width. 
6 Project Complete Except for Work Authorized by River and 
Harbor Act of 1950. 
31-59 
1964 
1964 
1964 
1962 
1963 
1964 
1961 
1961 
1964 
1962 
1964 
1960 
1960 
1960 
1929 
19646 
1964 
1941 
1904 
1961 
1962 
1961 
1962 
1962 
1962 
1962 
1962 
1962 
IY I - -- - - a' - II'' '- ' '- I - I

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
FOX RIVER, WI: LOCKS AND DAMS 
(SEE SECTION 15 OF TEXT) 
Depth At 
Normal Pool 
Miles Avail- Lower 
from Dis- Clear able Breast Miter Character Kind Year 
Green Nearest tance Width Length Lift Wall' Sill of of Type of Com- 
Name of Lock and Dam Bay Town (miles) (feet) (feet) (feet) (feet) (feet) Foundation Dam Construction plete 
Actual 
Cost 
DePere lock 2 
DePere dam 2 
Little Kaukauna lock2 
Little Kaukauna dam2 
Rapide Croche lock2 
Rapide Croche Dam2 
Kaukauna fifth lock2 
Kaukauna fourth lock2 
Kaukauna third lock 2 
Kaukauna second lock2 
~o Kaukauna first lock2 
Kaukauna Dam2 
Kaukauna guard lock 
Little Chute combined lock: 
Lower 
Upper 
Little Chute second lock2 
Little Chute first (guard) lock' 
Little Chute Dam2 
Cedars lock2 
Cedars Dam2 
Appleton fourth lock 2 
Appleton lower dam2 
Appleton third lock 2 
Appleton second lock2 
Appleton first lock2 
Appleton upper dam 
Menasha lock 2 
Menasha Dam2 
7.1 DePere 
7.2 DePere 
13.0 DePere 
13.1 DePere 
19.2 Wrightstown 
19.3 Wrightstown 
22.8 Kaukauna 
23.1 Kaukauna 
23.3 Kaukauna 
23.4 Kaukauna 
23.6 Kaukauna 
24.0 Kaukauna 
24.0 Kaukauna 
24.4 Little Chute 
25.4 Little Chute 
26.4 Little Chute 
26.5 Little Chute 
26.6 Little Chute 
27.3 Little Chute 
27.4 Little Chute 
30.7 Appleton 
30.9 Appleton 
31.3 Appleton 
31.6 Appleton 
31.9 Appleton 
32.2 Appleton 
37.0 Menasha 
37.8 Menasha 
6
6
2
2
1
1
I
1
1
1 
36.0 146.0 8.9 10.3 
36.0 146.0 7.2 8.0 
36.0 146.0 8.3 8.8 
35.6 144.0 9.1 6.7 
36.6 144.1 10.2 6.9 
30.6 144.0 10.2 6.9 
35.0 144.0 9.6 6.0 
35.1 144.4 11.0 6.9 
40.0 - - 9.4 
35.4 146.5 10.9 6.0 
36.3 144.1 10.6 7.6 
35.0 144.2 13.8 8.0 
35.4 - - 6.6 
35.0 144.0 9.8 6.8 
35.0 144.0 7.6 8.1 
35.0 144.0 8.7 6.0 
35.1 144.6 9.6 6.9 
35.0 144.7 10.0 6.6 
35.4 144.0 8.5 7.2 
12.0 Rock - Concrete 1936 $229,308 
- Rock Fixed3 4 Concrete 1929 209,536 
9.5 Clay - Concrete 1938 362,427 
- Clay and gravel Fixed 3 4 Piers and concrete 1926 179,398 
9.3 Rock - Concrete 1934 228,738 
- Rock Fixed 3 4 Concrete 1930 118,975 
9.3 Rock - Composite 1898 13,3105 
6.0 Rock - Stone masonry 1879 37,536 
6.3 Rock - Stone masonry 1879 39,948 
6.0 Rock - Stone masonry 1903 24,313 
6.0 Rock - Stone masonry 1883 38,704 
- Rock Fixed 3 
4 Concrete 1931 123,763 
- Rock - Stone masonry 1891 12,630 
8.6 Rock 
6.0 Hardpan 
6.1 Rock 
- Rock 
- Rock 
7.3 Rock 
- Rock 
7.9 Rock 
- Rock 
8.6 Rock 
6.0 Clay 
6.0 Rock 
- Rock 
8.0 Clay 
- Hardpan 
- Stone masonry 
- Stone masonry 
- Stone masonry 
- Stone masonry 
Fixed 3 4 Concrete 
- Stone masonry 
Fixed3 4 Concrete 
- Stone masonry 
Fixed 3 4 Concrete 
- Stone masonry 
- Stone masonry 
- Stone masonry 
Fixed3 Concrete 
- Composite 
Fixed 3 Concrete 
1879 102,304 
1879 - 
1881 48,555 
1904 7,8175 
1932 82,554 
1888 34,972 
1933 84,973 
1907 40,893 
1934 73,903 
1900 32,238 
1901 22,940 
1884 36,004 
1940 151,558 
1899 19,3265 
1937 84,686 
'Depth shown is on breast wall, which is controlling depth for 
upper pool. 
2Original structure built prior to assumption of control by 
United States on Sep. 18, 1872. 
3Provided with sluices. 
4Flash boards used. 
5Partially rebuilt. 
TABLE 31-I

DETROIT, MI DISTRICT 
TABLE 31--J RECONNAISSANCE & CONDITION SURVEYS 
Algoma Harbor, WI 
Bayfield Harbor, WI 
Belle River Harbor, MI 
Big Suamico River Harbor, WI 
Black River Harbor, MI (Port Huron) 
Channels In Straits of Mackinac, MI 
Chippewa Harbor, MI 
Cornucopia Harbor, WI 
Detour Harbor, MI 
Eagle Harbor, MI 
Grand Marais Harbor, MN 
Greilickville Harbor, MI 
Knife River, MN 
Lac LaBelle Harbixr, MI 
La Pointe Harbor, WI 
Les Cheneaux Island Channels, MI 
Little Bay I)e Noc Harbor, MI 
Mackinaw City Harbor, MI 
Manistee Harbor, MI 
Manistique Harbor, MI 
Oconto Hlarbor, WI 
Petoskey Harbor, MI 
Pine River Harbor, MI 
Port Austin Hlarbor, MI 
Port Wing larbor, WI 
St James Harbor, Mi 
Tawas Bay Harbor, Mi 
Washington Island (tIiarbors at Wisconsin) 
Whitefish Point hlarbor, MI 
August 1987 
June 1987 
August 1987 
July 1987 
August 1987 
August 1987 
August 1987 
June 1987 
September 1987 
May 1987 
May 1987 
August 1987 
June 1987 
May 1987 
June 1987 
August 1987 
January 1987 
June 1987 
August 1987 
March 1987 
June 1987 
June 1987 
August 1 987 
September 1987 
June 198' 
September 1987 
May 1987 
September 1987 
May 198 - 
31-61 
Name of Project Date Survey Conducted 
_ _ _L L ____ _ I I _ _ _ _ L _ _ _ _ _ _ _ _ _ 
___ __ ~__s ___ ______ I I I _I ___ I I _

BUFFALO, N.Y., DISTRICT * 
The district comprises Ohio, northwestern 
Pennsylvania and western and northern New York, 
embracing U.S. waters of Lake Erie exclusive of 
small portion of western end, Lake Ontario, and St. 
Lawrence River, with their tributary drainage 
basins from boundary between the states of Ohio 
and Michigan to international boundary line east of 
Frontier, New York. 
IMPROVEMENTS 
Navigation rase 
1. Ashtabula Harbor, Ohio .............. 32-2 
2. Black Rock Channel and 
Tonawanda Harbor, N.Y. ............. 32-2 
3. Buffalo Harbor, N.Y ... .............. 33-3 
4. Cattaraugus Harbor, N.Y............... 32-3 
5. Cleveland Harbor, Ohio................ 32-3 
6. Conneaut Harbor, Ohio.... ............. 32-5 
7. Dunkirk Harbor, N.Y ................... 32-5 
8. Erie Harbor, Pa........................ 32-5 
9. Fairport Harbor, Ohio ................ 32-6 
10. Geneva-on-the-Lake, Ohio ............. 32-6 
11. Great Sodus Bay Harbor, N.Y........... 32-7 
12. Huron Harbor, Ohio ................... 32-7 
13. Irondequoit Bay, N.Y .................. 32-7 
14. Little Sodus Bay Harbor, N.Y........... 32-8 
15. Lorain Harbor, Ohio................... 32-8 
16. Oak Orchard Harbor, N.Y............. 32-9 
17. Ogdensburg Harbor, N.Y .............. 32-10 
18. Olcott Harbor, N.Y ................... 32-10 
19. Oswego Harbor, N.Y. ............... 32-10 
20. Port Ontario Harbor, N.Y............. 32-11 
21. Rochester Harbor, N.Y ............... 32-11 
22. Rocky River Harbor, Ohio ............ 32-11 
23. Sandusky Harbor, Ohio .............. 32-12 
24. Toledo Harbor, Ohio ................. 32-12 
25. West Harbor, Ohio ................... 32-12 
-26. Reconnaissance and condition surveys 32-13 
27. Other authorized navigation projects.. 32-13 
28. Navigation work under 
special authorization ................. 32-13 
Beach Erosion Control Page 
29. Lakeview Park, Lorain, Ohio ......... 32-13 
30. Maumee Bay State Park, Ohio ........ 32-13 
31. Presque Isle Peninsula, Erie, Pa ....... 32-14 
32. Other authorized beach erosion 
control projects .................... 32-16 
33. Beach erosion work under 
special authorization ................ 32-16 
Flood Control 
34. Ellicott Creek, N.Y .................. 32-16 
35. Mount Morris Lake, N.Y., 
Genesee River ........ ........... 32-17 
36. Ottawa, Ohio ........ .... ....... 32-17 
37. Point Place, Toledo, Ohio ............ 32-18 
38. Reno Beach- 
Howard Farms Area, Ohio ......... 32-18 
39. Inspection of completed 
flood control projects............... 32-18 
40. National Emergency Preparedness ... 32-18 
41. Other authorized flood 
control projects ..................... 32-18 
42. Flood control work under 
special authorization ............... 32-19 
Deauthorized prqjects 
43. Deauthorized Projects .............. 32-19 
General Investigations 
44. Surveys ........................... 32-19 
45. Collection and study of basic data . . 32-19 
46. Advance Engineering & Design ...... 32-19 
47. Continuation of Planning 
and Engineering .................. 32-19 
32-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. ASHTABULA HARBOR, OHIO 
Location. On the south shore of Lake Erie, at 
mouth of Ashtabula River, 59 miles easterly from 
Cleveland, Ohio. (See NOAA Nautical Chart 14836.) 
Previous projects. For details see page 1963 of 
Annual Report for 1915, and page 1593 of Annual 
Report for 1938. 
Existing project. For description see pages 1297- 
99 of Annual Report for 1966. Federal cost of 
completed project is $12,240,147. Non-Federal costs 
of $5,743,000, including contribution of $47,000, 
were for construction of access roads, docks, 
storage and handling facilities and dockside 
dredging. See Table 32-B for authorizing legislation. 
Local cooperation. Fully complied with. Local 
interests contributed $47,000 for work authorized 
by 1936 and 1970 acts. 
Terminal facilities. There are 16 piers and 
wharves. One facility is owned by city of Ashtabula 
and one is owned by Coast Guard. Ten facilities are 
along banks of Ashtabula River and six are on 
southside of outer harbor. Eleven terminals have 
railroad connections and six have mechanical 
handling facilities. Facilities are considered 
adequate for existing commerce. (See Port Series 
No. 42, revised 1972, Corps of Engineers.) 
Operations and results during fiscal year. 
Maintenance: Miscellaneous inspection services and 
condition sediment surveys by government plant 
and hired labor cost $34,242. Aerial photography of 
shoreline, by contract, cost $965. Repairs to 169 1.f. 
of the west breakwater by U.S. derrickboat 
Tonawanda cost $258,436. Dredging, by contract, 
removed an estimated 84,650 cubic yards of shoaled 
material from the outer harbor and cost $339,431. 
Engineering and design cost $99,134. Supervision 
and administration cost $17,897. 
2. BLACK ROCK CHANNEL AND 
TONAWANDA HARBOR, N.Y. 
Location. Improvement is essentially that of 
upper 13.5 miles of Niagara River from its head at 
Lake Erie, Buffalo, N.Y., to and including 
Tonawanda Harbor, N.Y. It comprises 
improvements formerly designated by three titles; 
viz, Lake Erie entrance to Black Rock Harbor and 
Erie Basin, N.Y., Black Rock Harbor and Channel, 
N.Y. and Tonawanda Harbor and Niagara River, N.Y. 
(See NOAA Nautical Chart 14832.) 
Previous projects. For details see item 5 and 7, 
page 1970 of Annual Report for 1915, and page 1612 
of Annual Report for 1938. 
Existing project. For description of existing 
project and Federally owned Black Rock ship lock, 
see page 1548 of Annual Report for 1962. 
Improvement of guide pier at Black Rock Lock, as 
authorized by 1935 act was deauthorized by 
Congress in August 1977. Cost for completed 
portion of new work is $10,457,093. Enlarging of 
existing 21-foot turning basin and deepening lower 
1,500 feet of Tonawanda inner harbor from 16 to 21 
feet, authorized by the 1954 act, was deauthorized 
by Congress in May 1981, and is excluded from 
foregoing cost. Estimated cost, (1961) of this 
portion is $339,000. Non-Federal costs are 
estimated at $1,540,000 for costs incurred by New 
York State for construction of Erie Basin and 
protecting breakwater, and construction and 
extension of Bird Island Pier, and by other local 
interests for relocation of utilities. See Table 32-B for 
authorizing legislation. 
Local cooperation. Fully complied with for 
existing project. Contract for cost-shared 
recreation development at completed projects 
(Code 713 program) was executed by the New York 
State Department of Environmental Conservation, 
Albany, NY, on April 16, 1985, and was approved by 
the Assistant Secretary of the Army and Chief of 
Engineers on May 3, 1985. 
Terminal facilities. Two facilities are along 
upstream end of channel. Below Black Rock Lock 
and at Tonawanda Harbor there are 13 
privately owned terminals. There are two Stateowned 
barge canal terminals at Tonawanda, N.Y., 
and several marine service and supply docks for 
recreational and other small craft. The Corps owns 
a wharf adjacent to Black Rock Lock which is 
private. Ten terminals have railroad connections 
and six mechanical-handling facilities. Facilities 
considered adequate for existing commerce. (Port 
Series No. 41, revised 1971, Corps of Engineers. 
Operations and results during fiscal year. New 
Work: Construction of an elevated concrete 
walkway with railing and three refuge platforms on 
Bird Island Pier, under cost-shared recreation 
development at completed projects was completed 
in 1987. FY 87 non-Federal costs were $209,852 for 
the contract. Operation and care (Black Rock Lock): 
Lock was in operation 246 days and closed for 
underwater cleaning and repairs from January 4, 
1987 through May 2, 1987. Ordinary maintenance 
and repair of structures and grounds was 
accomplished throughout the year by Government 
plant and hired labor. Total costs of $1,985,726 were 
distributed as follows: Operation and care: 
operation of lock, ordinary maintenance and repair 
$540,058; maintenance of grounds $59,247; 
32-2

BUFFALO, NY DISTRICT 
miscellaneous inspection and condition sediment 
surveys, project supervision, economic study and 
support of Water Control Center $125,210. Snagging 
and clearing in project channels by Government 
plant and hired labor cost $86,108. Finalization of 
FY86 dredging contract cost $153,262. Repairs to 
approximately 6800 1.f. of Bird Island Pier (within 
project channel), by contract initiated in June, 1985, 
were completed in April 1987 and cost $758,254, 
including supervision and inspection. A/E contract 
for stability analyses of lockwall cost $42,025. 
Intercommunication system, by contract, cost 
$5,154. Contract for hi-potential tests on 
power/control cables cost $820. Engineering and 
design cost $215,588. 
3. BUFFALO HARBOR, N.Y. 
Location. At eastern end of Lake Erie, at head of 
-Niagara River, 176 miles easterly from Cleveland, 
Ohio. (See NOAA Nautical Charts 14820 and 14833.) 
Previous projects. For details see page 1967 of 
Annual Report for 1915 and page 1606 of Annual 
Report for 1938. 
Existing project. For description see page 1368 of 
Annual Report for 1963. In addition, on December 
15, 1980, OCE authorized the removal of bridge 
abutments of South Michigan Avenue Bridge. New 
work for completed project cost $18,837,601. 
Estimated non-Federal costs were $9,188,000 for 
deepening, widening, and improving Buffalo River 
and ship canal, constructing piers, retaining walls, 
and dikes and performing dockside dredging. See 
Table 32-B for authorizing legislation. 
Local cooperation. Fully complied with. 
Terminal facilities. There are 45 wharves and 
piers of which 4 piers, owned by Niagara Frontier 
Port Authority, and 9 privately owned and operated 
facilities are on outer harbor and along sides of 
Lackawanna and Union ship canal, 4 are along 
banks of Buffalo ship canal, and 26 along Buffalo 
River. Coast Guard facilities are at mouth of Buffalo 
River along left bank. City of Buffalo owns a slip on 
right bank of Buffalo River just north of Michigan 
Avenue Bridge for mooring city fireboat. Thirty-four 
terminals have railroad connections and 29 
mechanical-handling facilities. Facilities considered 
adequate for existing commerce. (See Port Series 
No. 41, revised 1971, Corps of Engineers.) 
Operations and results during fiscal year. 
Maintenance: Miscellaneous inspection services, 
condition sediment surveys by Government plant 
and hired labor, water control management, and 
real estate activities cost $232,362. Repairs to about 
150 l.f. of south breakwater by U.S. derrickboat 
McCauley cost $192,161. Removal of an estimated 
107,000 cubic yards of shoaled material, by 
contract, cost $884,340. Environmental activities at 
Times Beach, by contract and hired labor, cost 
$151,110. Aerial photography of shoreline, by 
contract, cost $5,819. Snagging and clearing in 
Buffalo River by Government plant and hired labor 
cost $18,424. Engineering and design cost $52,535. 
4. CATTARAUGUS HARBOR, N.Y. 
Location. At mouth of Cattaraugus Creek on 
south shore of Lake Erie about 12 miles 
northeasterly from Dunkirk Harbor, N.Y. and 24 
miles southwesterly from Buffalo Harbor, N.Y. (See 
NOAA Nautical Chart 14823.) 
Existing project. For details of the existing 
project, see page 32-4 of Annual Report for 1983. 
Construction was completed in January 1983. Total 
Federal cost for new work was $4,804,060. Total 
non-Federal cost for new work was $2,566,529, 
excluding $20,000 for lands. Existing project was 
authorized by 1968 River and Harbor Act (H. Doc. 
97, 90th Cong., 1st sess.) 
Local cooperation. See page 32-5 of Annual 
Report for 1976 for details of requirements of local 
cooperation. The cash contribution paid was 
$2,566,529. The State of New York executed local 
cooperation agreement in July 1981. 
Terminal facilities. Facilities consist of private 
docks for recreational craft and privately owned 
servicing and storage handling facilities for 
recreational and other small craft. 
Operations and results during fiscal year. 
Maintenance: Project condition sediment surveys 
were conducted at a cost of $5,547. Engineering and 
design studies related to ice-jamming and 
subsequent flooding cost $11,850. 
5. CLEVELAND HARBOR, OHIO 
Location. On south shore of Lake Erie, at mouth 
of Cuyahoga River, 176 miles westerly from Buffalo, 
N.Y. (See NOAA Nautical Chart 14839). 
Previous projects. For details see page 1962, 
Annual Report for 1915, and page 1585, Annual 
Report for 1938. 
Existing project. For description of existing 
project, as authorized through the 1966 
modification, see page 1269 of Annual Report for 
32-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 ~s - -- -I-. 
1967. Further improvements in the interest of 
commercial navigation and recreational navigation 
were authorized in the 1985 Supplemental 
Appropriations Act (PL 99-88). The commercial 
navigation portion of the overall project consists of: 
(a) enlarging and deepening to 31 feet LWD the east 
entrance channel; (b) deepening the east basin 
channel to 27 feet LWD; and (c) expanding the 
capacity of Dike Site 14 to contain the polluted 
dredged material resulting from the project. This 
portion of the project is currently on hold due to the 
inability of the local sponsor to finance their share of 
the project costs. The recreational navigation 
portion of the overall project consists of 
bulkheading and other necessary repairs to Pier 34 
and approach channels and necessary protective 
structures for mooring basins for transient vessels 
in the area south of Pier 34. The recreational 
navigation project was also authorized by the Water 
Resources Development Act of 1986 (PL 99-662). 
This act also authorized additional undefined 
improvements to Cleveland Harbor. Estimated total 
Federal cost of the existing project is $34,760,200 
(Oct. 1986) exclusive of undefined, inactive and 
deferred portions of the project. The amount of 
$29,315,100 is for completed work and the balance 
of $5,445,000 is for new work. Estimated non- 
Federal cost is $13,151,000 (Oct. 1986) of which 
$9,203,000 is actual cost for completed work and the 
balance of $3,948,000 is required for work 
authorized by PL 99-88 and PL 99-662. Remaining 
work authorized by 1946 River and Harbor Act, 
consisting of widening and deepening the right bank 
of Cuyahoga River at the downstream end of Cut 4, 
is considered inactive and excluded from foregoing 
cost estimate. Estimated Federal cost (1966) of this 
portion is $85,600 and non-Federal cost (1966) is 
$5,000,000. Remaining work authorized by 1958 
R&H Act, consisting of planning and replacement of 
bridges number 19 (E.L.R.R.) and 32 (B.& O.R.R.) 
and widening Cuyahoga and Old River channels, 
and remaining work authorized by the 1960 R&H 
Act, consisting of deepening the remainder of 
Cuyahoga River from bridge number 1 to and 
including the Old River to a depth of 27 feet, has 
been classified as deferred and is also excluded from 
foregoing cost estimate. Estimated Federal cost 
(Oct. 1976) of this portion is $18,033,300 and 
estimated non-Federal cost (Oct. 1976) is 
$21,251,000. See Table 32-B for authorizing 
legislation. 
Local cooperation. Fully complied with for 
completed portion of project. Items of local 
cooperation for the commercial navigation portion 
of the overall project authorized by PL 99-88 consist 
of: (a) Provide without cost to the United States all 
lands easements, and rights-of-way required for 
construction and maintenance of the harbor 
improvements, including suitable areas determined 
by the Chief of Engineers to be required in the 
general public interest for the initial and subsequent 
disposal of dredged material and also necessary 
retaining dikes, bulkheads, and embankments 
therefor, or the cost of such retaining works; (b) 
Accomplish without cost to the United States all 
alterations and relocations of transportation 
systems, storm drains, sewer outfalls, utilities, and 
other relocations and alterations made necessary 
by the project; (c) Hold and save the United States 
free from damages due to the construction and 
maintenance of the project, not including damages 
due to the fault or negligence of the United States or 
its contractors; (d) Provide and maintain without 
cost to the United States adequate depths in 
berthing areas and local access channels; (e) 
Provide, during the period of construction, a cost 
contribution equal to 25 percent of the estimated 
total cost of construction of the general navigation 
facilities assigned to commercial navigation; and (f) 
Repay with interest, over a period not to exceed 30 
years following completion of the project, an 
additional 0-10 percent of the total cost of 
construction of the general navigation facilities 
assigned to commercial navigation depending on 
the value of lands, easements, rights-of-way, 
relocations, and dredged material disposal areas 
provided by local interests for the general 
navigation features of the project. Items of local 
cooperation have not been established for the 
recreational navigation portion of the overall 
project. 
Terminal facilities. There are 65 piers and 
wharves. Fourteen are located in the outer harbor, 
11 on banks of Old River 40 along the deep-draft 
section of Cuyahoga River. Forty-one terminals have 
both railroad connections and mechanicalhandling 
facilities. The Corps owns a wharf at the 
foot of East 9th Street. Facilities are considered 
adequate for existing commerce. (See Port Series 
No. 43, revised 1981, Corps of Engineers). 
Operations and results during fiscal year. New 
Work: Coordination with local interests on the 
authorized project continued and assistance in 
developing a financing plan to fund the local share 
of the cost of the commercial navigation portion of 
the authorized project was provided at a cost of 
$49,794. Maintenance: Miscellaneous inspection 
services, condition sediment surveys, letter report 
on new confined disposal facility, and real estate 
32-4

BUFFALO, NY DISTRICT 
management cost $487,634. Environmental testing, 
by contract, cost $88,668. Aerial photography of 
shoreline, by contract, cost $1,417. Economic study, 
by contract, cost $20,125. Repairs to approximately 
250 l.f. of east arrowhead and east breakwater by 
U.S. derrickboats Tonawanda and Simonsen cost 
$1,176,883. Dike repairs by Government plant and 
hired labor cost $42,079. Removal of shoaled 
material: 213,112 cubic yards from the harbor and 
34,375 cubic yards from the upper Cuyahoga River, 
by contract, cost $1,568,174. In-house engineering 
costs for preparation of plans and specifications on 
contract dredging were $65,556. Major 
Rehabilitation: Supervision and administration cost 
$3,199. Finalization of FY85 contract cost $90,336. 
Engineering and design cost $42,833. 
6. CONNEAUT HARBOR, OHIO 
Location. On the south shore of Lake Erie, at 
mouth of Conneaut River, 73 miles easterly from 
Cleveland, Ohio. (See NOAA Nautical Chart 14824.) 
Previous projects. For details see page 1964, 
Annual Report for 1915. 
Existing projects. For description see page 1274 
of Annual Report for 1967. Actual costs for new 
work for completed portion of the project were 
$7,541,369. See page 1274, Annual Report for 1967, 
for complete description of project modification 
authorized by 1966 R&H Act. Estimated cost (1970) 
of this modification is $717,000. For completed work 
non-Federal costs were $200,000 for dockside 
dredging and removal of existing dolphins. 
Estimated non-Federal cost of $2,877,000 (1970) 
includes cash contribution of $717,000 and the 
remainder is for the construction of service facilities 
for the 1966 project modification. See Table 32-B for 
authorizing legislation. 
Local cooperation. Fully complied with for 
completed portion of project. See page 32-6 of 
Annual Report for 1971 for requirements of local 
cooperation for project modification as authorized 
by the River and Harber Act of 1966. 
Terminal Facilities. There are seven piers and 
wharves. Six are privately owned and operated and 
located ininner harbor. Remaining facility is city 
owned on the south side of outer harbor. Six 
terminals have railroad connections and four 
mechanical-handling facilities. (See Port Series No. 
42, revised 1972, Corps of Engineers.) 
Operations and results during fiscal year. 
Maintenance: Miscellaneous inspection services and 
condition sediment surveys were done by 
Government plant and hired labor at a cost of 
$20,490. Finalization of FY86 stone contract cost 
$5,959. Aerial photography of shoreline, by contract, 
cost $1,724. Engineering effort cost $3,141. 
7. DUNKIRK HARBOR, N.Y. 
Location. On south shore of lake Erie, 37 miles 
southwesterly from Buffalo, N.Y. (See NOAA 
Nautical Chart 14823.) 
Previous projects. For details see page 1966 of 
Annual Report for 1915, and page 1604 of Annual 
Report for 1938. 
Existing project. For description of completed 
portion of existing project see page 32-8 of Annual 
Report for 1976. For description of small boat 
harbor project as authorized under Section 201 of 
Flood Control Act of 1965, see page 32-8 of Annual 
Report for 1978. Actual costs for completed work 
are $3,010,024. Actual non-Federal costs are 
$1,961,000. See Table 32-B for authorizing 
legislation. 
Local cooperation. Fully complied with. 
Terminal facilities. Facilities consist of private 
docks for recreational craft and privately owned 
servicing and storage handling facilities for 
recreational and other small craft. 
Operations and results during fiscal year, 
Maintenance: Miscellaneous inspection services and 
condition sediment surveys by Government plant 
and hired labor cost $24,084. Environmental testing 
of harbor sediments, by contract, cost $3,427. 
Engineering and design cost $3,403. 
8. ERIE HARBOR, PA. 
Location. On southerly side of bay formed by 
Presque Isle Peninsula, on south shore of Lake Erie, 
78 miles westerly from Buffalo, N.Y. (See NOAA 
Nautical Chart 14835.) 
Previous projects. For details see page 1965 of 
Annual Report for 1915 and page 1600 of Annual 
Report for 1938. 
Existing projects. For description see pages 
1363-64 of Annual Repoirt for1963. Entire project 
modification authorized by 1945 River and Harbor 
Act, providing for deepening channel and basin, 
both 23 feet deep, to Penn Central Company coal 
docks at westerly end of harbor, was deauthorized 
by Congress in August 1977. Actual costs for new 
work for completed portion of project were 
$2,860,906. Extension of north pier portion, 
authorized by 1899 act was deauthorized in 
November 1981. Estimated cost (1955) of this 
32-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
- __ ---- 
portion is $1,071,000. A portion of work authorized 
by 1960 act, deepening strips adjacent to north and 
south piers, was deauthorized in August 1982. 
Estimated cost (July 1962) of this portion is $78,000. 
Non-Federal costs for completed work were $51,000 
for providing ore dock and dredging slip adjacent 
thereto. See Table 32-B for authorizing legislation. 
Local cooperation. Fully complied with. 
Terminal facilities. Sixteen piers and wharves, of 
which 12 are privately owned and operated. Erie 
International Marine Terminal No. 1 owned by Port 
Commission, city of Erie, is along main waterfront 
on south side of Presque Isle Bay and Coast Guard 
facilities are on north side. Two offshore oil docks 
are on Lake Erie. Eight terminals have railroad 
connections and six mechanical-handling facilities. 
Facilities are considered adequate for existing 
commerce. (See port Series No. 42, revised 1972, 
Corps of Engineers.) 
Operations and results during fiscai year. 
Maintenance: Miscellaneous inspection services, 
condition sediment surveys, and economic study by 
Government plant and hired labor cost $22,551. 
Environmental testing, by contract, cost $17,754. 
Finalization of FY86 dredging contract cost $25,104. 
Engineering and design effort toward late-FYawarded 
structure repair contract cost $45,662. 
9. FAIRPORT HARBOR, OHIO 
Location. On south shore of Lake Erie at mouth of 
Grand River, 33 miles easterly from Cleveland, Ohio. 
(See NOAA Nautical Chart 14837.) 
Previous projects. For details see page 1963 of 
Annual Report for 1915, and page 1590 of Annual 
Report for 1938. 
Existing project. For description of existing 
project as authorized through the 1960 
modifications, see page 1526 of Annual Report for 
1962; for description of small boat harbor as 
authorized by Sec. 201 of 1965 Flood Control Act, 
see page 32-10 of Annual Report for 1977. Estimated 
total Federal cost of new work is $4,931,000 (Oct. 
1980) of which $2,591,000 is actual cost for 
completed portion of piroject and the balance of 
$2,340,000 is for proposed work authorized by Sec. 
201 of 1965 FC Act which is deferred. Entire project 
modification authorized by 1960 River and Harbor 
Act, providing for deepening lake approach 
channel, 800-foot wide channel through outer 
harbor and channel in Grand River, and 
enlargement of turning basin, is classified inactive 
and is excluded from foregoing cost. Estimated cost 
of this modification is $3,170,000 (1963). Estimated 
non-Federal cost is $4,991,000 of which $101,000 
were for bulkheads and dockside dredging for 
completed portion of project and $2,560,000 which 
includes cash contribution of $2,330,000, is for work 
authorized by Sec. 201 of 1965 FC Act. For the 
inactive 1960 project modification, estimated non- 
Federal cost of $3,821,000 (1963) is for lands, 
relocations, utility changes, dock dredging and dock 
and bulkhead modifications. See Table 32-B for 
authorizing legislation. 
Local cooperation. See page 32-11 of 1976 Annual 
Report regarding assurances of local cooperation 
for work authorized by R&H Acts of 1927 and 1960 
and page 32-11 of 1977 Annual Report for 
requirements of local cooperation for work 
authorized by Sec. 201 of 1965 Flood Control Act. 
Terminal facilities. Sixteen piers and wharves, 
all along banks of Grand River. One facility is owned 
by Coast Guard. Nine terminals have railroad 
connections and ten mechanical-handling facilities. 
Facilities considerd adequate for existing 
commerce. (See Port Series No. 42, revised 1972, 
Corps of Engineers.) 
Operations and results during fiscal year. 
Maintenance: Miscellaneous inspection services, 
including economic study, and condition sediment 
surveys by Government plant and hired labor cost 
$61,733. U.S. derrickboat Simonsen completed 
structure repair initiated in FY86 summer on west 
breakwater at cost of $34,145. Engineering and 
design effort cost $20,399. 
10. GENEVA-ON-THE-LAKE, OHIO 
Location. On south shore of Lake Erie about 17 
miles east of Fairport Harbor, Ohio and 12 miles 
west of Ashtabula Harbor, Ohio. (See NOAA 
Nautical Chart 14826.) 
Existing project. Small boat harbor project 
provides for: (a) breakwaters in Lake Erie 
aggregating about 1,350 feet in length; (b) entrance 
channel about 730 feet long, 100 feet in width, 9 feet 
deep; (c) inner channels, 100 feet wide totaling 
1,500 feet in length and 6 feet deep; (d) a mooring 
area 0.5 acres in area with a depth of 6 feet; (e) 
development of recreational facilities and (f) 
development of wetland mitigation features. 
Estimated Federal cost for new work is $4,020,000 
(Oct. 1986). Non-Federal cost estimate is $4,020,000 
(Oct. 1986). Existing project was authorized under 
provision of Section 201 of Flood Control Act of 1965 
(H.D. 409, 91st Cong., 2d sess). 
Local cooperation. See page 32-11 of 1978 Annual 
Report for requirements of local cooperation for 
work authorized by Sec. 201 of 1965 Flood Control 
32-6

BUFFALO, NY DISTRICT 
Act. The State of Ohio Department of Natural 
Resources (ODNR) the responsible agency, signed a 
Local Cooperation Agreement (LCA) on June 24, 
1986. The LCA was executed on the part of the 
Federal Government on June 26, 1986. 
Terminal facilities. There are no commercial or 
recreational facilities at the harbor. 
Operations and results during fiscal year. New 
Work: Construction started on October 9. 1986 and 
is scheduled for completion by May 3, 1989. It is 
anticipated that the project will be completed in the 
spring of 1988 about one year ahead of schedule. 
Construction continued and was 89% complete at 
the end of fiscal year. Federal funds in the amount of 
$2,211,508 were expended for the construction 
contract, including supervision and administration, 
$85,009 were expended to complete Plans and 
Specifications and $134,384 were expended for inhouse 
engineering effort. Non-Federal expenditure 
was $1,931,460 for the construction contract 
including supervision and administration and 
$13,717 for in-house engineering effort. 
11. GREAT SODUS BAY HARBOR, 
N.Y. 
Location. On Sodus Bay, which is a nearly 
landlocked indentation on south shore of Lake 
Ontario, 29 miles westerly from Oswego, N.Y. (See 
NOAA Nautical Chart 14814.) 
Previous projects. For details see page 1972 of 
Annual Report for 1915 and page 1526 of Annual 
Report for 1938. 
Existing project. For description, see page 1380 
of Annual Report for 1963. improvements 
authorized by 1962 act, consisting of deepening lake 
approach channel, entrance channel and inner 
approach channel were deauthorized by Congress 
in August 1977. Actual costs of new work for 
completed portion of project were $249,187. Costs 
incurred by local interests are not available. See 
Table 32-B for authorizing legislation. 
Local cooperation. Fully complied with. 
Terminal facilities. Facilities consist of private 
docks for recreational craft and privately owned 
servicing and storage handling facilities for 
recreational and other small craft. 
Operations and results during fiscal year. 
Maintenance: Miscellaneous inspection services, to 
include title search action, and condition sediment 
surveys by Government plant and hired labor cost 
$6,002. U.S. derickboat McCauley repaired 50 l.f. of 
east breakwater at a cost of $76,078. 
12. HURON HARBOR, OHIO 
Location. On south shore of Lake Erie at mouth of 
Huron River, 47 miles westerly from Cleveland, Ohio. 
(See NOAA Nautical Chart 14843.) 
Previous project. For details, see page 1.961 of 
Annual Report for 1915, and page 1576 of Annual 
Report for 1938. 
Existing project. For description, see page 1347 
of Annual Report for 1963 and page 32-12 f Annual 
Report for 1978. Cost of completed portion of 
existing project was $4,834,006. Construction of 
detached breakwater as authorized by 1962 R&H 
Act is deferred. Estimated cost of construction of 
breakwater is $12,970,000 (July 1972). Non- 
Federal costs of $163,000 were incurred by local 
interests in 1963 for dockside dredging of areas 
between Federal improvement and terminal 
facilities. See Table 32-B for authorizing legislation. 
Local cooperation. Fully complied with. 
Terminal facilities. Six privately owned wharves 
and docks, one along left bank of Huron River and 
remainder along right bank. Four terminals have 
railroad connections and four mechanical-handling 
facilities. Facilities are regarded as adequate for 
existing commerce. (See Port Series No. 42, revised 
1972, Corps of Engineers.) 
Operations and results during fiscal year. 
Maintenance: Miscellaneous inspection services and 
condition sediment surveys by Government plant 
and hired labor cost $36,972. Economic study, by 
contract, cost $10,660. Finalization of FY86 stone 
purchase cost $2,079. Maintenance dredging, by 
contract, to remove an estimated 106,100 cubic 
yards of shoaled material cost $679,317. 
Engineering design costs were $25,168. 
13. IRONDEQUOIT BAY, N.Y. 
Location. On south shore of Lake Ontario, 4 miles 
east of Rochester, N.Y. at mouth of Irondequoit 
Creek, Monroe County, N.Y. (See NOAA Nautical 
Charts 14804 and 14815). 
Existing project. Provides for: (a) entrance 
channel 9 feet deep and 100 feet wide, extending 
from 9-foot depth in Lake Ontario to junction with 
inner bay channels a distance of about 1,300 feet; 
(b) inner channel, 8 feet deep and 100 feet wide, 
from entrance channel to deep water in bay, a 
distance of about 3,035 feet; (c) access channel, 8 
feet deep, 100 feet wide, and 500 feet in length from 
the inner bay channel to the west; (d) two stone 
rubblemound structures 1,350 feet and 750 feet in 
32-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
length at the natural entrance; and (e) recreational 
facilities of parking area, concrete walkways and 
hand railings on the breakwater and jetty and a boat 
launching ramp. The local sponsor (New York State 
Office of Parks, Recreation and Historic 
Preservation) requested that the boat launching 
ramp, parking areas and other recreational 
features be constructed under a separate contract 
from that for the navigation features. Construction 
of the breakwaters, jetty, navigation channel and 
highway bridge removal was completed in May 1986. 
Total estimated project cost is $15,363,000 (Oct. 
1984) including $3,582,000 Federal (which includes 
the CoE $3,536,000 and the USCG $46,000) and 
$11,781,000 non-Federal, including a cash 
contribution of $2,661,000, lands and damages 
$290,000 and the cost of a movable highway bridge 
$8,830,000. Existing project was authorized by 1958 
River and Harbor Act (H. Doc 332, 84th Cong., 2d 
sess.). 
Local cooperation. The Buffalo District has a 
properly executed Local Cooperation Agreement 
with New York State, executed April 20, 1983. 
Terminal facilities. Facilities consist of private 
docks for recreational craft and privately owned 
servicing and storage handling facilities for 
recreational and other small craft. 
Operations and results during fiscal year. New 
Work: Construction of certain recreational facilities 
were completed. Non-Federal contract cost 
including supervision and administration was 
$246,283. Federal contract cost including 
supervision and administration was $182,341. Inhouse 
engineering effort cost $16,223 Federal and 
$16,442 non-Federal. Construction of the 
recreational facilities was completed in August 
1987. Maintenance: Engineering and design cost to 
determine impact of development of scour hole at 
northerly end of west breakwater cost $1,850. 
14.LITTLE SODUS BAY HARBOR, N.Y. 
Location. Little Sodus Bay, on south shore of Lake 
Ontario, 15 miles west of Oswego, N.Y. (See NOAA 
Nautical Chart 14803.) 
Previous projects. For details see page 1973 of 
Annual Report for 1915, and page 1628 of Annual 
Report for 1938. 
Existing project. For description see page 1378 of 
Annual Report for 1958. New work for completed 
project cost $69,066. Non-Federal costs of $6,000 
were incurred for channel dredging. See Table 32-B 
for authorizing legislation. 
Local cooperation. None required. 
Terminal facilities. Facilities consist of private 
docks for recreational craft and privately owned 
servicing and storage handling facilities for 
recreational and other small craft. 
Operations and results during fiscal year. 
Maintenance: Miscellaneous inspection services and 
condition sediment surveys by Government plant 
and hired labor cost $8,318. U.S. derrickboat 
McCauley repaired 50 l.f. of east breakwater at a 
cost of $40,302. 
15. LORAIN HARBOR, OHIO 
Location. On south shore of Lake Erie at mouth of 
Black River, 28 miles westerly from Cleveland, Ohio. 
(See NOAA Nautical Chart 14841.) 
Previous projects. For details, see page 1961 of 
Annual Report for 1915, and page 1580 of Annual 
Report for 1938. 
Existing project. For description see pages 1319- 
22 of Annual Report for 1966. Estimated Federal 
cost of new work is $26,246,000 (Oct 1976). 
Deepening and widening remainder of Black River 
Channel at Cut 1 and construction of bank 
stabilization as authorized by 1960 act and modified 
by 1965 act is classified deferred. The estimated cost 
of $5,317,000 for this work is included in the above 
estimate. A portion of work authorized by 1960 act, 
dredging of 15-to-25 foot wide strips adjacent to the 
U.S. East and West piers is also deferred and 
estimated cost of $60,200 (July 1966) is excluded 
from foregoing cost estimate. Total non-Federal cost~ 
estimate is $8,853,000 (Oct 1976) including $3,000 
contributed by local interests toward construction 
of west shorearm. For work authorized by 1960 act, 
including deferred portion, non-Federal costs are 
estimated to be $8,805,000 for lands, relocations of 
utilities, modifications of existing docks and, 
bulkheads, construction of new bulkheads and 
dockside dredging. For work authorized by:1965 act, 
classified as deferred, local interests must make a 
cash contribution presently estimated to be $45,000. 
See Table 32-B for authorizing legislation. The Water 
Resources Development Act (WRDA) of 1986 (PL.. 
99-662) authorized construction of commercial 
navigation improvements consisting of two bend 
cuts on the Black River to widen and straighten the 
channel between the Norfolk and Western Railroad 
Bridge and the 21st Street Bridge. These cutsare to 
be excavated to the existing channel depth of 27 
feet. The plan also includes widening the Upper 
Turning Basin at the existing authorized depth of 21 
feet. Estimated costs for this work are $3,790,000 
Federal and $2,050,000 non-Federal (Oct 1986). On 
March 12, 1986 the chief of Engineers under 
32-8

BUFFALO, NY DISTRICT 
authority of Section 107 of the 1960 River and 
Harbors Act, as amended, authorized construction 
of a small boat harbor. The project consists of a 225- 
foot detached rubblemound breakwatrer and an 
800-foot long rubblemound breakwater attached to 
the east breakwater shorearm in the east basin of 
the outer harbor. Construction costs for this 
project, including supervision and administration, 
were $855,709 Federal and $694,341 non-Federal. 
Local cooperation, for completed work, local 
interests contributed $3,000. Work authorized by 
1960 act (and modified by 1965 act) is deferred. All 
other conditions fully complied with. On March 25, 
1986, the city of Lorain, Ohio signed the local 
cooperation agreement, for the Section 107 project. 
Fordetails see page 32-7 of Annual Report for 1986. 
Items of local cooperation for project authorized by 
1986 WRDA are: (a) Provide without cost to the 
United States all lands, easements, and rights-ofway 
necessary for implementation and 
maintenance of the project and for aids to 
navigation upon the request of the Chief of 
Engineers, including suitable areas determined by 
the Chief of Engineers to be required in the general 
public interest for initial and later disposal of 
dredged material, and including necessary retaining 
dikes, bulkheads, and embankments therefor, or the 
costs of such retaining works; (b) Hold and save the 
United States free from damages due to 
implementation and maintenance of the project, 
not including damages due to fault or negligence of 
the United States or its contractors; (c) Provide and 
maintain without cost to the United States 
adequate depths in berthing areas and local access 
channels; (d) Accomplish without cost to the United 
States all alterations and relocations of 
transportation facilities (excluding railroads, 
combined highway and railroad and publicly owned 
highway bridges and approaches thereto), storm 
drains, sewer outfalls, utilities, and other structures 
and improvemnts made necessary by the project; 
and (e) Pay 25% of the cost allocated to deep draft 
navigation during construction, and pay an 
additional 10% of the cost allocated to deep draft 
navigation within a period of 30 years following 
completion, if not offset by credit allowed for lands, 
easements, rights-of-way, relocations, except utility 
relocations, and dredged material disposal areas. 
Terminal facilities. There are 23 piers and 
wharves, of which three are on outer harbor and 
remainder are along banks of Black River. Two are 
owned by the city. Eight terminals have railroad 
connections and 15 mechanical-handling facilities. 
Facilities are considered adequate for existing 
commerce. (See Port Series No.42, revised 1972, 
Corps. of Engineers.) 
Operations and results during fiscal year. New 
Work: Construction of the Section 107 small boat 
harbor was completed in July 1987 and the project 
was dedicated on August 3, 1987. Federal funds in 
the amount of $648,427 were expended for the 
contract, including supervision and administration. 
In-house engineering effort cost $31,213. Non- 
Federal contract costs, including supervision and 
administration were $694,311. In-house engineering 
effort cost $1,728. Advance engineering and design 
funds in the amount of $108,471 were expended on 
in-house engineering effort for project authorized 
by the 1986 WRDA. Maintenance: Miscellaneous 
inspection services and condition sediment surveys 
by Government plant and hired labor cost $71,372. 
Economic study, by contract, cost $17,653. Repairs 
to 150 l.f. of the west breakwater and 35 1.f. of the 
west breakwater extension by the U.S. derrickboat 
Simonsen cost $396,132. Removal of an estimated 
150,000 cubic yards of shoaled material from Black 
River Channel and upper turning basin, by contract, 
cost $562,180. In-house engineering costs were 
$11,880. 
16. OAK ORCHARD HARBOR, N.Y. 
Location. On south shore of Lake Ontario at 
mouth of Oak Orchard Creek, 33 miles westerly of 
Rochester, N.Y. (See NOAA Nautical Chart 14805.) 
Previous project. For details see page 628 of 
Annual Report for 1905. 
Existing project. For description of completed 
existing project see page 32-14 of 1975 Annual 
Report. Actual Federal cost for completed project 
was $1,613,500. Estimated non-Federal cost is 
$270,000 (July 1971) including cash contribution of 
$170,700 and $54,002 for recreational facilities and 
remainder for lands and construction of wharf. 
Existing project was authorized by the 1945 River 
and Harbor Act (H. Doc. 446, 78th Cong., 2d sess. ). 
Local cooperation. Fully complied with. Local 
interests contributed $224,702. 
Terminal facilities. There is no commercial 
navigation at Oak Orchard Harbor. Terminal 
facilities consist of private docks for recreational 
craft. 
Operations and results during fiscal year. 
Maintenance: Miscellaneous inspection and 
condition sediment surveys cost $26,742. 
Environmental testing, by contract, cost $15,136. 
Engineering and design cost $2,879. 
32-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
17. OGDENSBURG HARBOR, N.Y. 
Location. On south shore of St. Lawrence River, 
62 miles by water from Lake Ontario. (See NOAA. 
Nautical Chart 14764.) 
Previous projects. For details see page 1975 of 
Annual Report for 1915, and page 1635 of Annual 
Report for 1938. 
Existing project. For descriptioh see page 1568 of 
Annual Report for 1962. Actual cost for new work 
for completed portion of project was $375,086. 
Removal of hard material shoals from lower basin 
portion of project as authorized by 1935 act, at an 
estimated cost of $183,000 (1954) was 
deauthorized Nov. 17, 1986. See Table 32-B for 
authorizing legislation. On April 20, 1983, the Chief 
of Engineers under authority provided by Section 
107 of the 1960 River and Harbor Act, as amended, 
authorized an extension of Lower East Entrance 
Channel, 600 feet west of the existing pier to a 
depth of 27 feet below LWD. This was completed in 
FY 1985. Actual contract cost for this work 
including supervision and administration was 
$974,903 Federal and $50,596 non-Federal. In 
addition to the above described dredging, the local 
cooperator is required to provide $4,000,000 for 
upland improvements. 
Local cooperation. For details of local 
cooperation requirements see page 32-8 of Annual 
Report for 1983. 
Operations and results during fiscal year. 
Maintenance: Finalization of FY86 economic study, 
by contract, cost $4,930. 
18. OLCOTT HARBOR, N.Y. 
Locaton. On soutn snore of Lake Ontario at 
mouth of Eighteen Mile Creek about 18 miles east of 
mouth of Niagara River and 63 miles by water west 
of Rochester, N.Y. (See NOAA Nautical Chart 
14806.) 
Previous project. For details see page 1971 of 
Annual Report for 1915 and page 1621 of Annual 
Report for 1938. Cost of new work for completed 
project was $1,500 exclusive of amounts expended 
on previous projects, all of which was contributed 
by local interests. See Table 32-B for authorizing 
legislation. 
Existing project. For description, see page 1555 
of Annual Report for 1961 
Local cooperation. r'ully complied with. Local 
interests contributed $1,500. 
Terminal facilities. Facilities consist of private 
docks for recreational craft and privately owned 
servicing and storage handling facilities for 
recreational and other small craft. 
Operations and results during fiscal year. 
Maintenance: Miscellaneous inspection services and 
condition surveys by Government plant and hired 
labor cost $6,202. Environmental testing, by 
contract, cost $17,067. 
19. OSWEGO HARBOR, N.Y. 
Location. On south shore of Lake Ontario, at 
mouth of Oswego river, 59 miles easterly from 
Rochester, N.Y. (See NOAA Nautical Chart 14813.) 
Previous projects. For details see page 1973 of 
Annual Report for 1915, and page 1630 of Annual 
Report for 1938. 
Existing project. For description see pages 1383- 
84 of Annual Report for 1963. Completed portion of 
project cost $7,242,039 and non-Federal costs for 
completed work were $4,440,000 for lands, dockside 
dredging, construction of terminal wharves, and 
cargo handling facilities. Deepening a 200-foot wide 
strip along harbor line east of mouth of Oswego 
River, remaining feature of work authorized by the 
1930 act, is classified as inactive. Deepening to 22 
feet a 150-foot wide strip along harbor line in west 
outer harbor, remaining feature of work authorized 
by 1940 act, was deauthorized in May 1981. 
Estimated Federal costs for this work are $246,000 
(July 1957) and $2,419,000 (July 1966) respectively, 
and estimated non-Federal costs are $500,000 (July 
1966) for dockside dredging for work authorized by 
1940 act. See Table 32-B for authorizing legislation. 
Local cooperation. Fully complied with. 
Terminal facilities. Seven piers and wharves in 
harbor and along river channel. In addition, Port of 
Oswego Authority owns two public terminals, one of 
which is west of river and includes a grain elevator 
and warehouse for miscellaneous freight. Other 
terminal is east of river and used for handling 
aluminum and general cargo. State of New York 
owns a river terminal used for mooring vessels. City 
of Oswego owns one dock and shore facilities for 
recreational craft. Facilities considered adequate 
for existing commerce. 
Operations and results during fiscal year. 
Maintenance: Miscellaneous inspection services and 
condition surveys by Government plant and hired 
labor cost $73,469. Repairs to about 85 1. f. of west 
arrowhead breakwater by U.S. derrickboat 
McCauley cost $227,156. Dredging, by contract, for 
removal of 44,801 cubic yards of shoaled material 
cost $214,891. Environmental testing, by contract, 
cost $32,146. Engineering and design for dredging 
cost $5,774. 
32-10

BUFFALO, NY DISTRICT 
20. PORT ONTARIO HARBOR, N.Y. 
Location. On southeasterly end of Lake Ontario, 
19 miles northeasterly of Oswego, N.Y., and 32 miles 
southerly of Sackets Harbor, N.Y. (See NOAA 
Nautical Chart 14803.) 
Previous projects. Adopted by the River and 
Harbor Act July 4, 1836. Only information available 
is the index to the report of the Chief of Engineers. 
Existing project. As modified by Phase I and II 
General Design Memorandum, provides for: (a) two 
shore connected rubblemound breakwaters in Lake 
Ontario at mouth of Salmon River, south 
breakwater about 1,350 feet and north breakwater 
about 350 feet long; (b) entrance channel between 
breakwaters, 100 feet wide and 8 feet deep, from 
deep water in lake to a limit about 1,200 feet from 8- 
foot depth contour in lake; (c) river channel 85 feet 
wide and 6 feet deep from inner limit of entrance 
channel for a distance upstream of about 450 feet. 
Estimated Federal cost for project is $2,350,000 
(Oct. 1987. Estimated non-Federal cost for new 
work is $1,670,000 (Oct. 1987) including cash 
contribution of $1,350,000. Existing project was 
authorized by the River and Harbor Act of March 2, 
1945 (H. Doc. 446, 78th Cong., 2d sess. ). 
Local cooperation. See page 32-16 of Annual 
Report for 1976 for details of requirements of local 
cooperation. Assurances have been received from 
the New York State Office of Parks, Recreation and 
Historic Preservation. The LCA was executed on 
June 24, 1986. 
Terminal facilities. The only commercial 
navigation at Port Ontario is charter boat fishing. 
Terminal facilities consist of private docks for 
recreational craft. 
Operations and results during fiscal year. New 
Work: Actual construction of the project began in 
May 1987. Federal contract costs, including 
supervision and administration, were $916,772. 
Non-Federal contract costs, including supervision 
and administration were $819,018. In-house 
engineering effort cost $111,532 Federal and 
$5,339 non-Federal. 
21. ROCHESTER HARBOR, N.Y. 
Location. On south shore of Lake Ontario, at 
mouth of Genesee River, 59 miles westerly from 
Oswego, N.Y. (See NOAA Nautical Chart 14815.) 
Previous project. For details see page 1471 of 
Annual Report for 1915, and page 1623 of Annual 
Report for 1938. 
Existing project. For description see page 1556 of 
Annual Report for 1962. Actual cost for new work 
for completed project is $21,191,514. Non-Federal 
costs are estimated at $2,260,000, all for 1960 act, 
for lands, relocation of submarine cable crossing, 
relocations of small docks and boathouses, dockside 
dredging, structure modifications, and replacement 
of Baltimore & Ohio coal loader. See Table 32-B for 
authorizing legislation. 
Local cooperation. Complied with except 
provision for replacement of coal loading facility as 
required by River and Harbor Act of July 14, 1960. 
Terminal facilities. One terminal facility at 
mouth of Genesee River has been leased to the Great 
Lakes Division of Pittston Stevedoring Corp. 
Facilities also consist of private docks for 
recreational craft and privately owned servicing 
and storage handling facilities for recreational and 
other small craft. Facilities are considered adequate 
for existing commerce. 
Operations and results during fiscal year. 
Maintenance: Miscellaneous inspection services and 
condition sediment surveys by Government plant 
and hired labor cost $25,420. Environmental testing, 
by contrast, cost $2,959. Aerial photography of 
shoreline, by contract, cost $1,074. Stone placement 
by U.S. derrickboat McCauley cost $4,806. 
Finalization of pier repair contract initiated in FY86 
resulted in credit of $2,325. Removal of 149,833 
cubic yards of shoaled material, by contract, cost 
$534,504. Supervision and administration cost 
$48,728. Engineering and design cost $106,198. 
22. ROCKY RIVER HARBOR, OHIO 
Location. At mouth of Rocky River which empties 
into Lake Erie 7 miles westerly from Cleveland, Ohio. 
(See NOAA Nautical Chart 14826.) 
Existing project. For description see page 1329 of 
Annual Report for 1966. Federal cost for completed 
project was $343,494 and non-Federal cost was a 
cash contribution of $249,346. See Table 32-B for 
authorizing legislation. 
Local cooperation. Fully complied with. Local 
interests contributed $249,346 for new work. 
Terminal facilities. Facilities consist of private 
docks for recreational craft and privately-owned 
servicing and storage handling facilities for 
recreational and other small craft. 
32-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Operations and results during fiscal year. 
Maintenance: Miscellaneous inspection services 
cost $59. 
23. SANDUSKY HARBOR, OHIO 
Location. On south shore of Lake Erie, in 
southeasterly portion of Sandusky Bay, 50 miles 
westerly from Cleveland, Ohio. (See NOAA Nautical 
Chart 14845.) 
Previous projects. For details see page 1960 of 
Annual Report for 1915, and page 1574 of Annual 
Report for 1938. 
Existing project. For description see pages 1511- 
12 of Annual Report for 1962. Actual costs for new 
work for completed project were $6,250,121, 
excluding $325,000 contributed by local interests. 
Non-Federal costs for completed project are 
estimated at $675,000 including $325,000 cash 
contribution and the remaining $350,000 is for 
dockside dredging adjacent to deepened channels 
authorized by 1960 act. See Table 32-B for 
authorizing legislation. 
Local cooperation. Fully complied with. Local 
interests contributed $325,000 for new work. 
Terminal facilities. Fourteen piers and wharves, 
three at west end of harbor and remainder along 
dock channel. One is a base for State-owned fish 
research and patrol boats. One publicly owned and 
six privately owned are used for mooring fishing 
boats and recreational craft and for ferry service. 
Five terminals have railroad connections and five 
mechanical-handling facilities. Facilities are 
considered adequate for existing commerce. (See 
Port Series No. 42, revised 1972, Corps of Engineers.) 
Operations and results during fiscal year. 
Maintenance: Miscellaneous inspection services and 
condition sediment surveys by Government plant 
and hired labor cost $71,646. Economic study by 
hired labor cost $12,454. Maintenance dredging, by 
contract, removed an estimated 87,000 cubic yards 
of shoaled material and cost $450,220. Supervision 
and administration cost $68,905. Engineering and 
design cost $20,857. 
24. TOLEDO HARBOR, OHIO 
Location. Comprises lower 7 miles of Maumee 
River and channel through Maumee Bay to Lake 
Erie. Maumee River has its source in northern 
Indiana and empties into Lake Erie. Harbor is at 
westerly end of Lake Erie, 99 miles westerly from 
Cleveland, Ohio. (See NOAA Nautucal Chart 14847.) 
Previous projects. For details see page 1959 of 
Annual Report for 1915, and page 1565 of Annual 
Report for 1938. 
Existing project. For description of existing 
project see pages 32-18 and -19 of Annual Report for 
1978. Cost of completed existing project was 
$15,567.147. See Table 32-B for authorizing 
legislation. 
Local cooperation. Fully complied with. 
Terminal facilities. Maumee River through city of 
Toledo has been developed extensively for deepdraft 
navigation. Detailed information on actual 
port and harbor facilities are in Port Series No. 44 
(revised 1972) prepared and published as Part 2, by 
Board of Engineers for Rivers and Harbors. 
Information on port administration and Federal 
services, port and terminal services and charges, 
and steamship services is prepared and published 
as Part I by the Port Development Staff, U.S. 
Department of Commerce. Facilities are considered 
adequate for existing commerce. 
Operations and results during fiscal year. 
Maintenance: Condition sediment surveys, 
environmental studies, and miscellaneous 
inspections and reports were performed by hired 
labor at a cost of $274,674. Removal of an estimated 
300,000 cubic yards of shoaled material from the 
Bay Channel and an estimated 84,645 cubic yards 
from the Maumee River Channel, by contract, cost 
$955,132. Repairs to confined disposal facility by 
hired labor cost $126,298. Finalization of FY86 
environmental contracts resulted in credit of 
$9,921. Finalization of aerial photography contract 
cost $4,880. Design of new confined disposal facility 
by A/E contract, cost $287,966; in-house 
engineering and design cost $105,391. Engineering 
and design for dredging cost $155,620. Supervision 
and administration cost $101,173. 
25. WEST HARBOR, OHIO 
Location. On southwest shore of Lake Erie, 13 
miles northeast of Port Clinton, Ohio. (See NOAA 
Nautical Chart 14847.) 
Existing project. For description of existing 
project, see page 32-10 of Annual Report for 1983. 
Total Federal cost for new work was $3,303,898. 
Total non-Federal cost was $3,922,000 including 
cash contribution of $3,795,000. Existing project 
was authorized by 1965 River and Harbor Act (H. 
Doc. 245, 88th Cong., 2d sess.) 
Local cooperation. See page 32-20 of 1978 Annual 
Report for requirements of local cooperation. By 
32-12

BUFFALO, NY DISTRICT 
letter dated January 31, 1978, State of Ohio stated 
its intent to furnish assurances of local cooperation, 
and executed LCA was received on March 9, 1981. 
Terminal facilities. Commerce at the harbor 
presently consists of recreational boating and 
affiliated activities. 
Operations and results during fiscal 
year.Maintenance: Engineering and design for late 
FY awarded contract cost $824. Reconnaissance 
and condition surveys and studies to determine 
impact and necessity of first-time maintenance cost 
$25,471. 
26. RECONNAISSANCE 
CONDITION SURVEYS 
AND 
Project Date of Survey 
Barcelona Harbor, NY Oct 1986 
Cape Vincent Harbor, NY Aug 1987 
Pt. Clinton Harbor, OH Aug 1987 
Vermilion Harbor, OH May-Sept 1987 
Wilson Harbor, NY Aug 1987 
FY Cost 
$ 554 
28 
4,169 
52,597 
3,377 
Remaining reconnaissance and condition surveys 
are reported in individual project writeups. 
27. OTHER AUTHORIZED 
NAVIGATION PROJECTS 
See Table 32-C. 
28. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
See Table 32-G. 
Navigation work pursuant to Section 302, Public 
Law 89-298. 
Lake Neatahwanta, Fulton, NY - Costs of $7,500 
were incurred for preparation of Detailed Project 
Study by contract. In-house engineering effort cost 
$23,923. 
Investigation and removal of sunken vessels and 
other obstructions to navigation under authority of 
Section 19 of the River and Harbor Act of 1899. 
Removal of sunken Barge No. 45, pinned against 
the upstream face of Peace Bridge pier 4, on the 
Niagara River was continued at a cost of $3,907,008. 
Navigation work pursuant to Section 111, Public 
Law 90-483. 
Fairport Harbor, OH - Costs of $8,809 were 
incurred for preauthorization studies. 
Beach Erosion Control 
29. LAKEVIEW PARK, 
LORAIN, OHIO 
Location. In the city of Lorain, Lorain County, 
Ohio, on south shore of lake Erie between 1,500 and 
3,000 feet west of Lorain Harbor west breakwater. 
(See NOAA Nautical Chart 14841.) 
Existing project. For description of existing 
project see page 32-19 of Annual Report for 1977. 
The Federal cost of the completed project was 
$1,360,986 and estimated non-Federal cost (Oct. 
1976) was $50,000 for relocation. In addition, local 
interests contributed $583,280. Five-year 
monitoring program was completed in 1982. 
Cooperative beach nourishment was conducted in 
FY 80 and FY 81, during which time a total of 9,000 
cubic yards of sand was placed within the project 
limits. Annual cost of 5-year program for beach 
replenishment and monitoring was approximately 
$75,000. In FY 84 an agreement was made between 
city of Lorain and the Federal government to 
continue cost sharing, 70% Federal and 30% local, 
the costs associated with annual beach 
nourishment until September 30, 1992, as provided 
by Section 156, P.L. 94-587. A beach nourishment 
contract was awarded and completed in FY 85, at a 
cost of $31,704 ($22,465 Federal funds, $9,239 non- 
Federal funds). Existing project authorized by 1954 
River and Harbor Act (H. Doc. 224, 83rd Cong., 1st 
sess.). 
Local cooperation. Fully complied with. 
Operations and results during fiscal year, New 
Work: In-house engineering effort cost $51 Federal 
funds and $49 non-Federal funds. The Federal cost 
for nourishment has totalled approximately 
$98,000 and costs to local interests have totalled 
approximately $40,000. 
30. MAUMEE BAY STATE PARK, 
OHIO 
Location. Maumee Bay State Park is located in 
Lucas County, OH approximately 5 miles east of 
Toledo. The 1,855 acre park has 11,000 feet of 
shoreline along the southerly end of Maumee Bay 
(Lake Erie). (See U.S. Geological Survey Map, 
Oregon, OH). 
Existing project. The study for Maumee Bay was 
conducted under the Western Lake Erie Shore 
Study authorized by the Committee on Public Works 
of the House of Representatives on April 11, 1974 
32-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
The project was authorized for construction by the 
1986 Water Resources Development Act (PL 99- 
662), November 17, 1986. The recommended plan as 
described in the General Affirmation Report (Feb 
1986) consists of a protective sand beach stabilized 
by rubblemound offshore breakwaters and jetties 
along the west half (5,300 ft.) of park shoreline and 
rubblemound revetment 7,200 feet long at the east 
end of the park. In July 1986, the Ohio Department 
of Natural Resources initiated advance 
construction of the rubblemound revetment along 
the easterly half of the park and work was 
completed in February 1987. This has reduced the 
estimated cost of the project to $12,440,000 (Oct. 
1987) of which $4,400,000 is Federal cost and 
$8,040,000 is non-Federal cost including 
lands,utilities and other recreation facilities. 
Local cooperation. The local sponsor, Ohio 
Department of Natural Resources, will, prior to 
construction enter into a binding agreement which 
-addresses .project construction and satisfies the 
-requirements of Section 221 of Public Law 91-611. 
The items of local cooperation listed in the Final 
Feasibility Report (Dec 83) are: (a) Provide without 
cost to the United States, all lands, easements, and 
rights-of-way, including borrow and spoil disposal 
areas as determined by the Chief of Engineers, 
necessary for the construction and subsequent 
maintenance of the project; (b) Contribute in cash 
30 percent of the project construction cost, 
including periodic beach nourishment, to be paid in 
a =lump sum prior to initiation of such work. In the 
event such work is scheduled over more than one 
Federal Fiscal Year, said contributionmayj be made 
in annual installments over the period of 
construction at a rate proportionate to the 
proposed or scheduled apportionment of Federal 
funds to the project with the final apportionment of 
cost to be made after actual completion of 
construction and determination of actual costs; 
(c) Provide appurtenant facilities shown on the 
State's Master Plan, for which recreational benefits 
have been taken; (d) Hold and save the United 
States free from all claims for damage due to 
construction, operation and maintenance of 
project, except for damage due to the fault or 
negligence of the Government orits Contractors; (e) 
provide without cost to the United States all 
alterations and relocations to existing 
improvements including highways, buildings, 
utilities sewers, and other facilities which may be 
required in connection with the construction of 
the project; (f) Construct permanent ! park 
structures and park roads above the 100-year water 
surface elevation of 577.3 IGLD and consider such 
elevation when constructing other facilities, which 
would be significantly affected by high waters; (g) 
Maintain and repair the protective structures and 
improvement measures during the useful life 
thereof as may be required to serve their intended 
purposes; (h) Control water pollution from within 
the park to the extent necessary to safeguard the 
health of the bathers; (i) Maintain continued public 
ownership and use of the shore upon which the 
Federal participation is based during the economic 
life of the project; (j) Provide and maintain 
necessary access roads, parking areas, and other 
public use facilities open and available to all on 
equal terms; and, (k) Comply with the applicable 
provisions of the uniform Relocation Assistance and 
Real Property Acquisitions policies Act of 1970, 
Public Law 91-646, approved January 2, 1971, in 
acquiring lands, easements, and rights-of-way for 
construction and subsequent maintenance of the 
project, and inform affected persons of pertinent 
benefits, policies and procedures in connection with 
said Act. Provisions contained in the 1986 Water 
Resources Act specify that project costs will be 
shared 50% Federal / 50% non-Federal. 
Operations and results during fiscal year. New 
Work: In-house engineering effort for FY 87 cost 
$24,630. 
31. PRESQUE ISLE PENINSULA, 
ERIE, PA 
Location. At Erie, Pa., on south shore of Lake Erie, 
78 miles southwest of Buffalo, N.Y. and 102 miles 
eastnortheast of Cleveland, Ohio. (See NOAA 
Nautical Charts 14824 and 14835). 
Existing project. For description of completed 
portion of existing project see page 1393 of Annual 
Report for 1963. The Water Resources Development 
(WRD) Act of March 7, 1974, reinstated and 
extended authorization for beach erosion control 
project, as provided in 1960 R&H Act, for a period of 
five years from date of enactment of 1974 WRD Act, 
or if the review study of such project is not 
completed prior to end of such period, until such 
study is completed and a report thereon submitted 
to Congress. Work authorized by the 1974 WRD Act 
was completed in 1979. The 1976 WRD Act provides 
for continued annual nourishment by stating: "At 
expiration of authorization provided in Section 57 
of WRD Act of 1974, the Secretary of the Army, 
acting through the Chief of Engineers, may provide 
32-14

BUFFALO, NY DISTRICT 
periodic beach nourishment in accordance with 
cost sharing provisions of Section 103 (a) (2) of Act 
of October 23, 1962." The act also authorized 
preparation of a Phase I General Design 
Memorandum. The Final Phase I General Design 
Memorandum (GDM) was completed in June 1980 
and the recommended plan provides for 
construction of 58 offshore rubblemound 
breakwater segments, beach restoration by 
placement of sand fill, and annual beach 
replenishment for shore protection. A draft 
reformulation report was prepared in June 1985 to 
reassess the Presque Isle project and analyze 
additional plans for controlling beach erosion. The 
report concluded that the plan selected in the Phase 
I GDM could be modified to reduce the number of 
offshore breakwater segments from 58 to 38 and to 
construct 10,000 feet of bank run gravel beaches 
along the neck of the peninsula. The project would 
be constructed by a 12-year staged construction 
program. On September 20, 1985, the Office, Chief of 
Engineers recommended to the Assistant Secretary 
of the Army that the Corps proceed with the 
ongoing 58-breakwater plan with staged 
construction. Detailed engineering and design 
studies (CP&E) concluded that construction of the 
58-breakwater plan by a 12-year staged 
construction program is the most efficient and 
practicable plan for reducing the net combined 
Presque Isle Beach and Erie harbor annual costs. 
The WRD Act of 1986, Public Law 99-662, which was 
approved on November 17, 1986, authorized 
construction of the project for shoreline protection 
at Presque Isle Peninsula, Erie, Pennsylvania in 
accordance with the Report of the Chief of 
Engineers dated October 2, 1981 at an estimated 
total cost of $34,800,000 with an estimated first 
Federal cost of $18,900,000 and an estimated first 
non-Federal cost of $15,900,000. Estimated Federal 
cost for the authorized project modifications (Oct. 
1986) is $16,301,000 which includes $5,646,000 for 
completed work authorized by the 1954 and 1960 
R&H Acts and 1974 WRD Act and $8,036,000 for 
completed work authorized by the 1976 WRD Act. 
Estimated non-Federal cost for the authorized 
project and modifications (Oct 1986) is $8,555,000 
which includes $3,983,000 for completed work 
authorized by 1954 and 1960 R&H Acts and 1974 
WRD Act and $3,461,000 for completed work 
authorized by the 1976 WRD Act. The estimated 
Federal cost (Oct 1986) for the 58 breakwater 
project is $25,400,000 of which $9,500,000 is for 
continuation of the present annual nourishment 
project while the permanent features are being 
built. The estimated non-Federal cost (Oct 1986) 
for the breakwater project is $12,600,000 of which 
$4,000,000 is for continuation of the present annual 
nourishment project while the permanent features 
are being built. See Table 32-B for authorizing 
legislation. 
Local cooperation. Fully complied with for 
completed project as authorized by 1954 and 1960 
R&H Acts and 1974 WRD Act. An agreement 
between the United States of America and the 
Commonwealth of Pennsylvania, acting through 
the Department of Environmental Resources, was 
entered into on February 21, 1979 for the annual 
nourishment which was extended by the 1976 
WRD Act. The 58 breakwater project is contingent 
upon local sponsor, namely the Department of 
Environmental Resources of the Commonwealth of 
Pennsylvania, agreeing in writing to provide 
without cost to the United States all lands, 
easements, and rights-of-way, including suitable 
borrow and disposal areas for excavated material 
as determined by the Chief of Engineers and 
necessary for implementation and for periodic 
nourishment of the project; provide a cash 
contribution based on the appropriate percentage 
of final construction cost, exclusive of lands, 
easements, and rights-of-way, the percentage to be 
in accordance with existing law based on shore 
ownership and use existing at time of construction, 
which contribution is presently estimated at 
$12,600,000 or 35% ($8,600,000) for permanent 
project features and 30 percent $4,000,000 for 
continuation of the present annual nourishment 
project while the permanent features are being 
built; pay 30% of the cost for annual beach 
redistribution and replenishment work for the 
project; hold and save the United States free from 
damages due to construction works, exceept for 
damages due to fault or negligence of Government 
or its Contractors; maintain and operate all the 
works, including breakwaters and periodic sand 
nourishment and redistribution as needed, after 
completion in accordance with regulations 
prescribed by the Secretary of the Army; and assure 
continued public ownership and continued public 
use without cost to the United States of appropriate 
access and facilities including parking and 
sanitation, necessary for realization of public 
benefits upon which Federal participation is based, 
and administer and maintain beach for continued 
public use during life of project. Formal assurances 
of local cooperation will be requested and executed 
prior to initiation of construction of improvements. 
32-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Operations and results during fiscal year. New 
Work: Beach nourishment as authorized by the 1976 
WRD Act was continued. One contract for providing 
beach nourishment was awarded and completed. A 
total of 228,000 tons of sand were placed on the 
beaches. The 1987 program included a test 
placement of 45,000 tons of coarse sand that was 
obtained from the offshore borrow area and placed 
on beach no. 8 and 10,000 tons of fine sand that was 
obtained from the offshore borrow area and placed 
on beach no. 1. The balance of the sand (173,000 
tons) was obtained from upland sources. The 
contract also included placement of a 12-inch top 
dressing layer of wave washed sand over the course 
upland sand that was used to construct the 
protective berms. About 27,000 tons of sand that 
were washed onto the haul roads during winter 
storms were removed and used for the dressing 
layer. During the year a total of $1,671,530 
($1,163,404 Federal and $508,126 non-Federal) was 
expended for beach nourishment overations. Of 
this total, contract costs were $1,055,292 Federal 
and $473,073 non-Federal. In-house engineering 
effort cost $108,112 Federal and $35,051 non- 
Federal. The Commonwealth of Pennsylvania 
contributed $518,571 for their share of the FY 87 
nourishment operations. The cumulative non- 
Federal total project share through FY 87 is 
$7,443,957. The Final Phase I General Design 
Memorandum was submitted to the Secretary of the 
Army in October 1981 for his review and transmittal 
to Congress. In FY 87 a net credit of $1,488 was due 
to finalizing the year's real estate activities for the 
permanent project. The Phase II General Design 
Memorandum which presents the detailed final 
design of the project recommended in the Phase I 
General Design Memorandum has been completed 
and is being reviewed. 
32. OTHER AUTHORIZED BEACH 
EROSION CONTROL PROJECTS 
See Table 32-D. 
33. BEACH EROSION WORK UNDER 
SPECIAL AUTORIZATION 
LAKESHORE PARK 
ASHTABULA, OHIO 
Location. Lake shore Park is located in Ashtabula, 
Ashtabula County, Ohio, about 40 miles southwest 
of Erie, Pennsylvania, and about 50 miles northeast 
of Cleveland, Ohio. (See U.S. Geological Survey Map, 
Ashtabula North, OH). 
Existing project. For description of existing 
project, see page 32-12 of Annual Report for 1983. 
Construction was completed in July 1983. 
Local cooperation. For details of local 
cooperation requirements, see page 32-12 of Annual 
Report for 1983. 
Operations and results during fiscal year. New 
Work: FY 87 Federal cost was $73,045 for beach 
nourishment contract. 
Beach erosion activity pursuant to Section 103, 
Public Law 87-874 (preauthorization). 
Mentor Beach Park, Mentor,OH-Costs of $274 
were incurred for preauthorization studies. 
Simms Park, Euclid, OH-Costs of $149 were 
incurred for preauthorization studies. 
Point Gratiot, Dunkirk, NY-Costs of $15,000 were 
incurred for preauthorization studies. 
Put-In-Bay, OH-Costs of $7,500 were incurred for 
preauthorization studies. 
Willowick, OH-Costs of $7,500 were incurred for 
preauthorization studies. 
Wright Park Beach, Dunkirk, NY-Costs of $7,500 
were incurred for preauthorization studies. 
Flood Control 
34. ELLICOTT CREEK, N.Y. 
Location. The proposed channel improvement is 
located on the downstream portion of Ellicott Creek 
in the towns of Amherst and Tonawanda, Erie 
County. (See Geological Survey maps of Tonawanda 
East and Buffalo Northeast, N.Y.) 
Existing project. For detailed description of the 
original project as authorized by Section 201 of the 
1970 Flood Control Act, see page 32-24 of Annual 
Report for 1973. The basic authorization, as 
modified by the Water Resources Development Act 
of 1974, provides authority to undertake flood 
control measures to alleviate flooding that is 
compatible with authorized project and any 
alternatives currently under restudy pursuant to 
Flood Control Act of 1970. As a result of restudy of 
alternatives, the project provides for: (a) widening, 
straightening and deepening about 2.5 miles of 
existing creek channel including the existing bypass 
channel in Ellicott Creek Park; (b) 
construction of a diversion channel about 5,850 feet 
long between Maple Road and Millersport Highway; 
(c) construction of a diversion channel about 1,950 
feet long through Pfohl Park; (d) construction of a 
diversion channel about 9,150 feet long from 
Niagara Falls Boulevard upstream to about Pfohl 
32-16

BUFFALO, NY DISTRICT 
Park; (e) construction of 3 highway bridges; (f) 
modification of culverts at Tonawanda Creek Road; 
(g) modification of utilities and drainage outlets; 
and (h) recreation facilities consisting of a bike 
and hike path about 5.4 miles long, with open space 
park areas. The estimated Federal cost of existing 
project is $12,800,000 (Oct. 1986). The estimated 
non-Federal cost is $9,200,000 (Oct. 1986). 
Completion of preconstruction planning and 
construction was authorized Dec. 29, 1981, under 
Section 5, PL 97-128. 
Local cooperation For details of local 
cooperation see page 32-22 of Annual Report for 
1976. On October 25, 1976, the New York State 
Department of Environmental Conservation 
furnished a letter of intent to cooperate toward 
construction of project. On June 22, 1983, a formal 
Local Cooperation Agreement was requested from 
N.Y. State. On January 20, 1984, this agreement was 
fully executed. 
Operations and results during fiscal year. New 
Work; The FY 85 Supplemental Appropriations Act 
(PL 99-88) provided funds to initiate construction 
of the Federal project. In August 1986 a contract for 
the Stage 1 portion of the flood control project was 
awarded. In August 1987 Stage 1 contract work was 
completed, and a contract was awarded and 
construction initiated on Stage 2. A third contract, 
Stage 2A is scheduled to be advertised in December 
1987 which will complete the project. Construction 
on Stages 2 and 2A is scheduled for completion by 
December 1988. Costs for FY 87 were $2,299,890 for 
the contract, including supervision and 
administration and $519,495 for in-house 
engineering effort. 
35. MT. MORRIS LAKE, N.Y. 
GENESEE RIVER 
Location. Dam is on Genesee River 66.9 miles 
above river mouth and about 32 miles southwesterly 
of Rochester, N.Y. Reservoir is in Livingston and 
Wyoming Counties, N.Y. (See Geological Survey 
maps of Nunda and Portage, N.Y.) 
Existing project. For description of existing 
project as authorized by 1944 Flood Control Act see 
page 1575 of Annual Report for 1962. New work for 
completed project cost $23,365,559. In addition 
$5,000 contributed funds were expended for new 
work. 
Local cooperation. None required. Local interests 
contributed $5,000 for new work. 
Operations and results during fiscal year. 
Maintenance: Operation and ordinary maintenance 
of dam, reservoir, and service facilities, condition 
and operation studies and miscellaneous reports, to 
include stability analysis and dam safety study, were 
accomplished by hired labor for $396,334. Co- 
Operative Stream Gaging program accomplished by 
U.S. Geological Survey and National Weather Service 
reporting and hydroclimatic network cost $86,289. 
Operation of the Water Control Center cost 
$167,311. Debris removal, by contract, cost 
$116,159.Repair of radio tower cost $4,850. 
Installation of sanitary facilities in garage cost 
$3,325. Engineering and design costs for 
maintenance were $177,533. 
36. OTTAWA, OHIO 
Location. Ottawa is located on the Blanchard 
River, about 22 miles upstream from its confluence 
with the Auglaize River. The Blanchard River drains 
about 765 square miles of the extreme southeastern 
corner of the Maumee River Basin which covers 
about 6,586 square miles in northwestern Ohio, 
northeastern Indiana and southeastern Michigan. 
(See U.S. Geological Survey map for Ottawa, OH.) 
Existing project. The local protection project, 
authorized by Section 203 of the 1966 Flood Control 
Act (Public Law 89-789), provides for construction 
of levees, floodwalls combined with channel 
improvement, bridge change, and construction of 
new bridges. The reformulated project consists of 
improving the floodway by clearing and snagging 
the Blanchard River, removing abandoned railroad 
and highway embankments, relocating a power line, 
clearing a floodway and doing some selected filling 
-on the riverbanks. The non-structural component of 
the selected plan consists of automating one gage at 
Ottawa, OH, to provide an early warning system to 
residents. Estimated Federal cost of the project 
(Jan 86) is $661,500. Estimated non-Federal cost is 
$418,500 (Jan 86) including a cash contribution of 
$62,300. 
Local cooperation. The local sponsor, Maumee 
Watershed Conservancy District, will, prior to 
construction, enter into a binding written 
agreement, which addresses project construction 
and satisfies the requirements of Section 221 of 
Public Law 91-611. For details of local cooperation, 
see page 32-15 of Annual Report for FY 85. By letter 
dated 10 September 1987, the Conservancy District 
informed the Buffalo District that it cannot provide 
a Letter of Intent because the Village of Ottawa 
is unable to provide any funds to meet the non- 
Federal funding requirements for this project. 
32-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Operations and results during fiscal year. New 
Work: The Final General Reevaluation Report/Final 
Environmental Impact Statement was completed in 
April 1987 and submitted to North Central Division 
(NCD) for review. NCD reviewed the subject report 
and issued final report review comments that were 
addressed by the District. The plans and 
specifications were completed in September 1987. 
In -house engineering for FY 87 cost $98,091. 
37. POINT PLACE, TOLEDO, OHIO 
Location. Point Place is located on a peninsula in 
northeast portion of city of Toledo, Ohio. Its shores 
are bounded on the east by Maumee Bay of Lake 
Erie and on the west by Ottawa River. The peninsula 
extends in a northeasterly direction immediately 
north of mouth of Maumee River. 
Existing project.The project provides for: (a) 
combination of protective structures consisting of 
5,700 linear feet of steel sheet pile wall and 18,700 
feet of levee; (b) three new pumping stations; and 
-(c) 5,500 linear feet of new storm sewer facilities, 
including 2,400 linear feet of gravity outfalls. The 
project costs are $9,916,000 Federal and $4,220,897 
non-Federal including a cash contribution of 
$1,865,800. Existing project was authorized by 1965 
Flood Contol Act (H.D. 363, 92nd Cong., 2d sess). 
Local cooperation. For details of local 
cooperation see pages 32-24 and -25 of Annual 
Report for 1978. The Local Cooperation Agreement 
was executed by city of Toledo on January 27,1982. 
Operations and results during fiscal year. New 
Work: The entire project was completed in June 
1986. Total Federal costs for FY 87 were $3,972 for 
contract costs including supervision and 
administration, and $6,530 for in-house engineering 
efforts. Non-Federal funds expended were $28,333 
for contract costs and $29,831 for in-house 
engineering effort. 
38. RENO BEACH - HOWARD FARMS 
AREA, OHIO 
Location. Area is located in Lucas County, on the 
south shore of Lake Erie about 15 miles east of 
Toledo, Ohio. (See U.S. Geological Survey map for 
Reno Beach and Metzger Marsh, OH). 
Existing project. The local protection project, as 
authorized, provides for construction of 8,200 feet 
of roadway seawall, consisting of an earth dike, 
faced on the lakeward side with a quarry-run stone 
fill; and a steel sheet pile floodwall connecting the 
easterly end of this seawall at Wards Canal to the 
existing inland dike paralleling the canal. Estimated 
Federal cost of new work consisting of 
reconstructing to a permanent project the 
"Operation Foresight" work which was completed in 
1973, is $5,540,000 (Oct 1987). Non-Federal cost 
estimate of $1,850,000 (Oct 1987) includes cash 
contribution of $520,000 toward first cost of 
construction plus all lands, easements, and rightsof-
way. Project was authorized under Section 203 of 
the Flood Control Act of 1948 (H.D. 554, 80th 
Cong. 2d sess.). 
Local cooperation. See pages 32-16 of 1982 
Annual Report for full requirements of local 
cooperation. A Local Cooperation Agreement 
(LCA) has been negotiated with the Local Sponsor 
and has been sent forward. Approval is pending 
submittal of the local sponsor's Statement of 
Financial Capability. 
Operations and results during fiscal year. New 
Work: In FY 87 coordination at the Federal, State, 
and local level cost $12,159. 
39. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Inspection of completed flood control works for 
compliance with Federal requirements were made 
during the period at a cost of $183,592. Total cost to 
Sept. 30, 1987 was $857,034. 
Inspection of non-Federal Levees was performed 
at a cost of $6,626. 
40. NATIONAL EMERGENCY 
PREPAREDNESS 
FY 87 costs were $156,121 
41. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See Table 32-E. 
32-18

BUFFALO, NY DISTRICT 
42. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
See Table 32-H. 
CONESUS LAKE, LIVONIA, N.Y. 
Location. Conesus Lake is situated in western 
New York State about 25 miles south of the city of 
Rochester. (See U.S. Geological Survey Map, Livonia, 
NY). 
Existing project. Project was authorized for 
construction by the Chief of Engineers pursuant to 
Section 205 of the Flood Control Act of 1948, as 
amended, on July 22, 1985. Project provides for a 
steel sheet piling and concrete control structure 
with sluice gates, just upstream of the Route 20A 
bridge. The outlet channel will be aligned 
immediately west of the trailer park. The channel is 
designed with a bottom width of 60 feet and 1V on 
3H sideslopes. Downstream of the Route 20A bridge, 
the creek will be channelized with a 35-foot bottom 
width and 1V on 3H sideslopes. The channel will 
continue downstream for about one mile. 
Approximatelyl4 acres of land were required for 
temporary and permanent easements. The non- 
Federal sponsor is required to enact and enforce 
flood plain management regulations. A 1.2 acre 
parking lot will be provided at the north end of 
Conesus Lake. A small-boat launching platform and 
an ice-fishing access trail will be constructed. The 
"Ames Parcel" wetland located at the southern end 
of Conesus Lake is used by northern pike during 
spring high water levels as a spawning area. Under 
the mitigation plan, approximately 10 acres of this 
wetland is being shallowly scalped, graded, and 
revegetated, to prevent entrapment of fry and eggs, 
by receding water levels. This plan will provide 25- 
year flood protection and prevent 96% of flood 
damages. Estimated cost of the project is $867,800 
(Oct. 1983). Estimated non-Federal cost is $288,630 
(Oct. 1983). 
Local cooperation. On September 25, 1985, the 
New york State Department of Environmental 
Conservation signed the Local Cooperation 
Agreement. For details see page 32-16 of Annual 
Report for FY 86. 
ODerations and results during fiscal year. New 
Work: Project construction is 75% complete and is 
scheduled for completion in June 1988. Federal 
costs for contract including supervision and 
administratior: were $1,016,074 and non-Federal 
costs were $14,928. Federal in-house engineering 
-cost $68,810 and non-Federal cost $37. 
EUCLID CREEK, CLEVELAND, OH 
Location. Euclid Creek has a drainage area of 
approximately 25 square miles and is located east of 
Cleveland in Cuyahoga County and a small portion 
in Lake County, Ohio. (See U.S. Geological Survey 
Map, East Cleveland, OH). 
Existing project. For details of existing project, 
see page 32-14 of the Annual Report for 1983. Initial 
construction of project was completed in 1986. In 
FY 88 minor work will be done including 
construction of a concrete floodwall and a slope 
revetment as well as minor dredging of shoals. 
Local cooperation. For details of local 
cooperation requirements, see page 32-13 of Annual 
Report for 1984. 
Operations and results during fiscal year. New 
Work: In-house engineering effort cost $36,532. 
Flood Control and Coastal Emergencies (Public 
Law 99, 84th Congress, as amended by Sec. 206 of 
Flood Control Act of 1962). 
FY 87 costs for Disaster Preparedness were 
$417,992. Cost for Emergency Operations were 
$18,247. Federal costs for Advance Measures were 
$1,498,853 and non-Federal costs were $69,196. The 
Advance Measures project at Eastlake, Lake 
County, Ohio provides for repair to an existing 1,000 
foot rubblemound dike and was completed in early 
FY 87. FY 87 Federal costs for the contract including 
supervision and administration were $40,200 and 
non-Federal costs were $61,637. The project at 
Bayview, Erie County, Ohio, provides for placement 
of a 1,400 foot impervious dike along Sandusky Bay 
and was completed in FY 87. A net credit of $7,559 
was the result of an adjustment made to balance 
Federal and non-Federal shares. The Advance 
Measure at Wightman's Grove, Sandusky County, 
Ohio was made ready for construction during FY 87. 
Contract award and construction will take place in 
the first half of FY 88. Estimated Federal costs, 
$245,000, non-Federal costs $105,000. The Advance 
Measures Self-Help Program initiated in FY 87 has 
seen the distribution of 3.9 million sandbags with 
requisite quantities of sand and plastic sheeting to 
Great Lakes shoreline counties in New York (9 
counties), Ohio (8 counties) and Pennsylvania (1 
county). FY 87 Federal costs totaled $1,348,261. 
43. DEAUTHORIZED PROJECTS 
See Table 32-I. 
32-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
General Investigations 
44. SURVEYS 
During FY 1987 costs of $1,456,562 were incurred 
as shown below: 
Navigation Studies .................... $185,328 
Flood Damage Prevention Studies ....... 724,824 
Shoreline Protection Studies ........... 147,562 
Special Studies .............................. 
Miscellaneous Investigations ............. 88,770 
Coordination Studies ................... 111,286 
Phase I GDM Studies ........................ 
Comprehensive Studies ............... 198,792 
Review of Authorized Projects ................ 0 
45. COLLECTION AND STUDY 
OF BASIC DATA 
During the period, costs of $21,298 were incurred 
in connection with International Water Studies 
under the General Investigations appropriation and 
$451,155 incurred under the Operations and 
Maintenance appropriation for a total cost of 
$472,453. Flood plain management services were 
performed during the year at a cost of $202,790. 
During the year, a flood hazard evaluation study 
was completed for the Maumee River in Henry 
County, Ohio. The results of this study will enable 
Henry County to encourage and enforce prudent 
.use of the flood plain along the Maumee River. Also, 
hundreds of technical assistance requests regarding 
flood plain matters were completed during the year 
responding to individuals, corporations, real estate 
companies, insurance agents, engineering firms and 
local agencies. Costs for General Hydrologic Studies 
were $2,000. 
46. ADVANCE ENGINEERING AND 
DESIGN 
Costs during the period were $218,721 for 
advance engineering and design projects. For 
details of individual projects, see sections 15, 36 and 
38 in text. 
47. CONTINUATION OF PLANNING 
AND ENGINEERING 
Costs during the period were $23,142 for 
continuation of planning and engineering. For 
details of individual projects, see sections 30 and 31 
in text. 
32-20

BUFFALO, NY DISTRICT 
TABLE 32-A COST AND FINANCIAL STATEMENT 
See 
Section 
in Funding FY84 FY 85 FY 86 FY87 Total Cost to 
Text Prqject Sept 30, 1987 
1. Ashtabula Harbor, New Work 
Ohio 
2. Black Rock Channel 
and Tonawanda 
Harbor, N.Y. 
(Federal Funds) 
(Contrib. Funds) 
3. Buffalo Harbor, 
N.Y. 
4. Cattaraugus Harbor, 
N.Y. 
(Federal Funds) 
(Contrib. Funds) 
5. Cleveland Harbor, 
Ohio 
6. Conneaut Harbor, 
Ohio 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
12,805,339' 
- 12,805,339 1 
253,762 
435,196 
732,518 
757,638 
5 
310,000 
310,000 
1,502,215 
1,688,268 
304,500 
325,492 
781,500 
750,105 
10,636,946 
10,585,576 
- 6.077,000 
- 6,077,000 
310,000 
310,000 
2,423,821 2,869,826 
2,463,803 2,718,745 
020,000 
250,000 159,998 
- 11,135,120 2 
- 11,135,1202 
1,861,755 35,596,965' 
1,985,726 35,527,624 a. 
620,000 
209,852 619,850 
- 23,115,187' 
- 23,115,187' 
980,715 
947,421 
2,222,000 
2,043,936 
1,610,000 
1,764,633 
1,806,000 52,905,515 s 
1,536,751 52,539,625 6' 
295,457 
295,457 
-197,000 
-192,556 
956 
956 
50,029 
242,593 
422 
1,425 
1,425 
157 
93,141 
49,039 
4,804,060 
- 4,804,060 
5,547 
17,397 
101,069 
68,817 
- 2,566,529 
- 2,566,529 
15,000 
4,472,125 
6,057,166 
178,000 
193,000 
2,942,000 3,050,000 
3,265,105 3,088,149 
- 2,915,000 
- 2,109,110 
901,700 
979,729 
54,000 
97,511 
32-21 
2,895,000 
3,646,340 
651,000 
633,847 
50,000 31,896,299 e 
49,794 31,896,093 6 
3,509,000 142,855,4857 
3,450,536 142,728,221 7 
300,000 16,404,903 
136,368 16,186,721 
- 8,346,641k 
- 8,346.6418. 
14,000 
31,314 
9,138,102 9 
9,138,050 
- 651,850 
- 651,850

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 32-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section 
in Funding FY 84 FY 85 FY 86 FY 87 Total Costto 
Text Project Sept. 30, 1987 
t. Dunkirk Harhnr New Work 
N.Y. 
(Federal Funds) 
(Contrib. Funds) 
8. Erie Harbor, Pa. 
9. Fairport Harbor, 
Ohio 
10. Geneva-on-the-Lake, 
Ohio 
(Federal Funds) 
(Contrib. Funds) 
11. Great Sodus Bay 
Harbor, N.Y. 
12. Huron Harbor, 
Ohio 
(Federal Funds) 
(Contrib. Funds) 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
_- 3,010,02410 
- 3,010,02410 
11,161 
20,124 
9,338 
13,523 
35,095 
34,406 
33,000 
30,914 
1,745,870 
1,743,058 
1,950,000" 
- 1,950,000"1 
_- 3,597,87312 
- 3,597,87312 
72,944 
2,020,193 
-12,685 
301,108 
353,185 
296,835 
185,006 
111,071 
15,031,76113 
14,901,47613 
- 1,154 
- 1,154 
- 2,959,61114 
- 2,959,61114 
692,469 
783,369 
760,500 
764,300 
15,000 
267,000 
263,177 
215,000 
92,221 
- 750,000 
- 64,036 
10,925 
7,500 
706 
4,131 
7,500 
7,398 
111,000 
116,277 
2,303,000 
2,430,901 
2,356,000 
1,945,177 
85,000 
82,080 
13,148,672 
13,148,117 
3,195,000 
3,185,122 
3,106,000 
2,009,213 
610,9591' 
610,95915 
2,459,403 
2,456,381 
713,544 
713,544 
- 5,103,79516 
- 5,103,79516 
1,047,523 
996,446 
465,000 
530,980 
600,000 
598,849 
792,000 
754,196 
15,618,926 
15,563,021 
247,030 
247,030 
63,079 
63,079 
32-22 
7

BUFFALO. NY DISTRICT 
TABLE 32-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section 
in Funding FY 84 FY 85 FY 86 FY 87 Total Cost to 
Text Project Sept 30, 1987 
13. Irondequoit Bay 
N.Y. 
(Federal Funds) 
(Contrib. funds) 
14. Little Sodus Bay 
Harbor, N.Y. 
15. Lorain Harbor, 
Ohio 
(Federal Funds) 
(Contrib. Funds) 
16. Oak Orchard 
Harbor, N.Y. 
17. Ogdensburg harbor, 
N.Y. 
(Federal Funds) 
(Contrib. Funds) 
18. Olcott Harbor 
N.Y. 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
,New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
1,060,000 
838,951 
1,200,000 
7,637 
1,047,523 
996,446 
788,368 
25,000 
-166,925 
1,389,500 
1,589,224 
198,565 
105 000 
1,850 
71,340 
262,725 
3,535,800 
3,535,576 
105,000 
1,850 
2,660,840 
2,647,954 
- 301,394"7 
- 301,394'7 
12,289 
1,308 
11,000 
9,560 
1,421,000 
1,271,705 
62 
11,043 
70,000 
43,839 
906,000 
1,064,095 
3,000 
2,803 
575,000 
263,456 
1,124,000 
1,093,955 
- 660,000 
- 14,198 
50,000 
48,621 
3,097,569 
3,095,993 
742,822 
742,822 
377,000 21,772,55818 
679,640 21,736,05318 
1,087,000 
1,059,216 
203,000 
696,038 
24,323,429 
24,251,229 
863,000 
710,236 
-- 1,586,99619 
-- 1,586,996' 
1,436 
1,436 
317,647 
22,000 
50,585 
135,076 
24,062 
150,000 
703,736 
3,801 
3,801 
6,205 
-25,717 
85,297 
5,406 
26,823 
21,893 
210 
45,005 
44,757 
236,523 
236,275 
-- 1,720,46620 
- 1,720,46620 
4,930 
1,357,00721 
1,357,00721 
57,000 
57,000 
140,21022 
140,21022 
76,804 
69,019 
-12,464 
-4,679 
23,336 
23,269 
32-23 
549,5842:1 
549,517 2" 
14,47724 
14,47724

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 32-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section i Funding FY 84 FY 85 FY 86 FY 87 Total Cost to 
TTeexxtt PPrrqojjeecctt Sept 30, 1987 
19. Oswego harbor, NY 
20. Port Ontario 
Harbor, N.Y. 
(Federal Funds) 
(Contrib. Funds) 
21. Rochester Harbor, 
N.Y. 
22. Rocky River 
Ohio 
23. Sandusky 
Harbor, Ohio 
24. Toledo Harbor, 
Ohio 
25. West Harbor, Ohio 
(Federal Funds) 
(Contrib. Funds) 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
8,430,01625 
8,430,01625 
115,000 
111,237 
7,000 
16,576 
17,703 
17,703 
7 3 3,009 
553,436 
6,720,52726 
6,540,95426 
307,590 
307,590 
10,000 160,000 
59,808 
-- 270,000 
1,795,000 
2,069,140 
98,000 
422,623 
1,828,000 
1,734,843 
920,000 
1,028,304 
560,000 
824,358 
1,900,00027 
1,898,11227 
830,000 
824,358 
2,439,30828 
- 2,439,30828 
627,000 17,269,81629 
721,364 17,249,38029 
343,494 
343,494 
25,004 
14,432 
716,240 
683,523 
628,768 
397,652 
909,000 
956,276 
3,951 
245,580 
813,000 
813,049 
- 2,231,036 
59 2,231,036 
- 6,727,27030 
- 6,727,270 � 
639,000 
624,082 
14,324,439 
14,309,415 
675,606 
675,606 
17,191,84231 
17,191,8423' 
4,586,188 
4,037,727 
-90,000 
-88,787 
20,364 
20,364 
141,747 
3,999,000 
4,632,667 
1,071 
14,739 
14,739 
3,320,000 
3,367,229 
3,741,500 
2,001,213 
77,548,55332 
75,773,15232 
3,303,898 
3,303,898 
48,744 
48,744 
45,472 
26,296 
129,319 
110,143 
- 3,795,000 
- 3,795,000 
32-24

BUFFALO. NY DISTRICT 
TABLE 32-A (Continued) COST AND FINANCIAL STATEMENT 
See 
Section 
in Funding FY 84 FY 85 FY 86 FY 87 Total Cost to 
Text Prqject Sept 30, 1987 
29. Lakeview Park 
Lorain, Ohio 
(Federal funds) 
(Contrib. Funds) 
30. Maumee Bay State 
Park, Ohio 
31. Presque isle 
Peninsula, Erie, Pa. 
(Federal Funds) 
(Contrib. funds) 
33 .Lakeshore Park 
Ashtabula, Ohio 
(Federal Funds) 
(Contrib. Funds) 
34. Ellicott Creek 
N.Y. 
35. Mt. Morris 
Lake, N.Y. 
Genesee River 
36. Ottawa, Ohio 
37. Point Place, 
Toledo, Ohio 
(Federal Funds) 
(Contrib. Funds) 
38. Reno Beach-Howard 
Farms Area, Ohio 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
25,000 
7,108 
990,000 
426,294 
1,092 
1,092 
373,254 
1,656 
939 
3,187 
21,494. 
24,927 
10,700 
9,239 
1,160,000 
1,708,859 
44 
44 
497,143 
870,230 
-2,808 
-12,293 
14,745 
15,000 
-239 
22 
1,412 
200,000 
175,258 
1,085,000 
1,101,511 
497,143 
529,863 
85,000 
13,739 
865,000 
505,283 
- 1,741,125 
51 1,741,125 
49 
250,000 
1,163,000 
1,163,404 
486,429 
508,126 
73,045 
2,474,000 
2,819,385 
739,700 
739,700 
450,000 
175,258 
13,833,562 
13,831,336 
4,978 
4,978 
6,292,141 
6,287,654 
871,844 
870,820 
249,707 
249,707 
5,234,000 
5,203,515 
- 23,365,559 
- 23,365,559 
965,000 
1,042,141 
690,000 
2,000,000 
3,149,683 
290,895 
152,000 
143,715 
856,000 
999,826 
250,000 
105,113 
3,500,000 
3,512,573 
740,000 
1,408,243 
101,000 
94,459 
990,000 
1,004,820 
142,821 
117,000 
109,421 
45,320 
57,021 
3,000 
'17702 
931,000 
951,801 
135,000 
98,091 
10,501 
90,480 
58,164 
25,000 
12,159 
11,822,309 
11,806,270 
385,000 
346,025 
9,916,000 
9,915,991 
.- 1,865,800 
1,829,481 
635,467 
622,391 
32-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 32-A (Continued) COST AND FIcN'IANCiAL rEMENT 
See 
Section 
in Funding FY 84 FY 85 FY 86 FY 87 Total Cost to 
Text Project Sept 30, 1987 
42. Conesus Lake New Work 
Livonia, N.Y. Approp. 32,000 35,000 448,000 953,000 1,943,000 
(Federal Funds) Cost 59,834 24,443 134,255 1,084,884 1,748,877 
(Contrib. Funds) New Work 
Approp. - 35,000 - 35,000 
Cost - - 14,964 14,964 
42. Euclid Creek, New Work 
Ohio Approp. - 390,000 90,000 85,000 3,337,000 
Cost 1, 541,480 992,579 108,791 36,532 3,258,617 
1. Includes $565,192 for previous projects. Excludes 
$47,000 contributed funds. 
2. Includes $58,027 for previous projects. 
3. Includes $4,922 emergency relief authority 
administrative costs transferred from new work to 
maintenance upon conversion to programming and budgeting 
system July 1, 1953, by direction of Office, Chief of Engineers. 
Also includes appropriations and costs under appropriation 
titles 96 3123 Operation and Maintenance and 96 5125 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters. 
4. Includes $4,277,586 for previous projects. Excludes 
expenditures of $239,305 for work authorized by Section 107. 
5. Includes $1,883,647 for previous projects. Excludes 
$446,805 contributed funds. 
6. Includes $1,564,154 for previous project and 
appropriations and costs of $16,596 for modification 
authorized for construction under authority of Sec. 107, 1960 
R&H Act. 
7. Includes appropriations and costs under 
appropriation titles 963123 Operations and Maintenance and 
965125 Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters. Excludes $201,960 
contributed funds. 
8. Includes $805,272 for previous projects. 
9. Includes $39,784 for previous projects. 
10. Includes $811,250 for previous projects. Excludes 
$11,000 contributed funds. 
11. Includes $176,520 for previous projects. 
12. Includes $736,967 for previous projects. 
13. Includes $104,900 for previous projects. Excludes 
$154,500 contributed funds. 
14. Includes $368,940 for previous projects. 
15. Includes $361,772 for previous projects. 
16. Includes $269,789 for previous projects. 
17. Includes $232,328 for previous projects. 
18. Includes $292,203 for new work for previous projects. 
Excludes $3,000 contributed funds. Also excludes 
appropriation and cost of $29,570 under authority of Section 
107, 1960 R&H Act. 
19. Excludes $224,702 contributed funds. 
20 Includes $271,380 for previous projects. 
21. Includes $130,512 for previous projects. 
22. Includes $140,210 for previous projects. Excludes 
$1,500 contributed funds. 
23. Includes $38,959 for previous projects. Excludes 
$5,000 contributed funds. 
24. Excludes $186,000 Public Works Acceleration Act. 
25. Includes $1,187,977 for previous projects. 
26. Includes $945,684 for previous projects. 
27. Includes $50,000 for previous projects. 
28. Includes $247,794 for previous projects. 
29. Includes $617,529 for previous projects and $478 
emergency relief authority administration costs transferred 
from new work to maintenance upon conversion to 
programming and budgeting system, July 1, 1953, by direction 
of Office, Chief of Engineers. 
30. Includes $477,149 for previous projects. Excludes 
$325,000 contributed funds. 
31. Includes $1,624,695 for previous projects. 
32. Includes $16,914 for previous projects. 
33. Excludes $5,000 contributed funds. 
32-26

U FFALO NY DISTRICT 
TABLE 32-B AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
June 3, 1896 
Mar. 3, 1905 
June 25, 1910 
Mar. 2, 1919 
Aug. 30, 1935 
Aug. 26, 1937 
Mar. 2, 1945 
Sept. 3, 1954 
July 14, 1960 
Oct. 27, 1965 
Aug. 11, 1888 
June 3, 1896 
June 13, 1902 
June 13, 1902 
Aug. 8, 1917 
Mar. 3, 1905 
July 27, 1916 
Mar. 2, 1919 
Mar. 2, 1945 
Sept. 22, 1922 
ASHTABULA HARBOR, OHIO (See Section 1 of Text) 
Construction of breakwater. 
Enlarge outer harbor by extending west breakwater and 
constructing new east breakwater; pierheads on lakeward 
ends of breakwaters; and remove part of old east breakwater. 
Extend west breakwater to shore; dredge outer harbor to a 
depth of 20 feet. 
Remove portion of east breakwater, extend breakwaters to 
present project dimensions and dredging restrictions in 
portion of west basin. 
Dredge channel through outer harbor, channel of approach to 
Penn Central Co. slip, channel Ashtabula River, to and in 
turning basin all to present project dimensions; remove 
portion of old east inner breakwater and maintenance to 24- 
foot depth of portion of outer harbor. 
Extend river channel to present project limit. 
Dredging approach channel and turning basin in east 
outerharbor to 25-foot depth. 
A depth of 29 feet in soft and 30 feet in hard material in entrance 
channel to just outside outer ends of breakwaters; thence 28 
feet in soft and 29 feet in hard material in a channeltto inner 
breakwater; thence 27 feet in soft and 28 feet in hard material 
in a channel extending to Penn Central Co. slip and extending 
2000 feet up Ashtabula River; 22 feet in hard material in 
turning area; and 28 feet in soft and 29 feet in hard material in 
areas adjacent to 250-foot section of inner breakwater when 
that section is removed as now authorized. 
Dredging approach, channel and turning basin in east outer 
harbor to 28 feet in soft material and 29 feet in hard material. 
BLACK ROCK CHANNEL AND TONAWANDA 
HARBOR, N.Y. (See Section 2 of Text) 
Dredging channel through horseshoe reef at outlet of Lake Erie 
and Tonawanda Inner Harbor, to 16 feet. 
Deepening Tonawanda Creek to 16 feet. 
Dredging channel from Buffalo outer harbor to foot of Maryland 
St., Buffalo t to 21 feet. 
Dredging channel from foot of Maryland St., Buffalo, to natural 
deepwater pool upstream from Tonawanda Harbor to 21 feet; 
construction of ship lock and bridge; and repair of Bird Island 
pier and towpath wall. 
Dredging channel along Tonawanda Island, with turning basin 
at its downstream end at the foot of the Island, to 21 feet. 
Dredging triangular area at junction with Buffalo north 
entrance channel. 
Widening channel at foot of Maryland St., Buffalo. 
Annual Report, 1895, p. 
2132. 
H. Doc. 654, 61st Cong., 2d 
sess. 
H. Doc. 997, 64th Cong., 1st 
sess. 
H. Doc. 43, 73d Cong., 1st 
sess. 
Rivers and Harbors 
Committee Doc. 78, 74th 
Cong., 2d sess. 
H. Doc. 
sess. 
H. Doc. 
sess. 
H. Doc. 
sess. 
321, 77th Cong., 1st 
486, 83d Cong., 2d 
148, 86th Cong., 1st 
H. Doc. 269 89th Cong., 1st 
sess. 4 
H. Ex. Doc. 83, 50th Cong., 
1st sess. Annual Report, 
1888, p. 2066, and 
Annual Report, 1897, pp. 
3116-3120. 
H. Doc. 143, 56th Cong., 1st 
sess., and Annual Report, 
1900 p. 4152. 
H. Doc. 125, 56th Cong., 
2d sess., and Annual 
Report, 1901, p. 3343 
H. Doc. 428, 58th Cong., 
2d sess. 
H. Doc. 658, 63d Cong., 2d 
sess. 
H. Doc. 1004, 65th Cong., 
2d sess. and H. Doc. 
92, 79th Cong., 1st sess. 
H. Doc. 981, 66th Cong.,. 3d 
sess. 
32-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 32-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 3, 1925 
June 26, 1934' 
Aug. 30, 19356 
Mar. 2, 1945 
Sept. 3, 1954 
May 20, 1826 
June 23, 1866 
June 23, 1874 
June 3, 1896 
Mar. 3, 1899 
Mar. 3, 1909 
June 6, 1900 
June 13, 1902 
Mar. 2, 1907 
Mar. 2, 190710 
June 25 1910 
July 25, 1912 
Mar. 2, 1919 
Jan. 21, 1927 
July 3, 1930 
Aug. 30, 193511 
Aug. 30, 1935 
Mar. 2. 1 94 5 1' 
July 14, 1960 
Widening canal south of International Bridge and removal of 
westerly end of Rattlesnake Island shoal. 
Operation and care of improvements provided for with funds 
from War Department appropriations for rivers and harbors. 
Removal of rock shoals in Lake Erie entrance to canal, and in 
canal south of Ferry Street Bridge, to 22 feet; enlargement of 
North Tonawanda turning basin; extension of Bird Island pier; 
improvement of guide pier at the lock; and elimination of 
upper 150 feet ofTonawanda Creek channel from the project.7 
Widening Lake Erie entrance to canal. 
Deepen lower 1,500 feet of Tonawanda inner harbor and enlarge 
turning basin. 
BUFFALO HARBOR, N.Y. (See Section 3 of Text) 
Construction of south pier (extended in 1868)' 
Construction of old breakwater. 9 
Extension of old breakwater. 
Stony Point and south breakwater.9 
North breakwater.9 
Deepening entrance channel to inner harbor and removing rock 
shoal therein. 
Dredging at entrance to canals at South Buffalo in outer harbor.' 
South entrance breakwater.9 
Extension of Federal project to Commercial St. and removal of 
Watson elevator site.9 
Deepening areas A, B, and D in outer harbor to 21 feet, and 
area C in north entrance to 23 feet. 
Deepening areas F and G in outer harbor to 21 feet. 
Removal of shoal between entrance channel to Buffalo River and 
Erie Basin to 21 feet. 
Deepening areas H, I, and K in outer harbor to 21 feet. 
Extension of south entrance and south breakwaters, deepening 
outer harbor to present project dimensions, and removal of 
shoals on approach to south entrance. 
Maintenance of channels in Buffalo River and Buffalo ship canal 
to 21 feet in cooperation with city of Buffalo. 
Deepening North and Buffalo River entrance channels, and 
deepening and maintaining Buffalo River and Buffalo ship 
canal to present project dimensions. 
Deepening approach to south entrance channel to 30 feet; 
deepen to 30 feet in outer area and 29 feet in inner area of 
south entrance channel; and deepen to 28 feet southerly 
part of outer harbor. 
32-28 
H. Doc. 289, 68th Cong., 1st 
sess. 
H. Doc. 
sess. 
28, 73d Cong., 1st 
H. Doc. 92, 79th Cong., 1st 
sess.
4 
H. Doc. 423, 83d Cong., 2d 
sess. 4 , 8 
Annual Report, 1868, pp. 
222 and 232 
Annual Report, 1868, pp. 
232 236. 
Annual Report, 1876, pt. 2, 
pp. 569 and 573. 
Annual Report, 1895, p. 
3153. 
H. Doc. 72, 55th Cong., 1st 
sess., and Annual Report, 
1897, p. 3245. 
Specified in acts. 
Specified in act. 
H. Doc. 240, 59th Cong., 1st 
sess. 
H. Doc. 298, Rivers and 
Harbors Committee Doc. 
2, 61st Cong., 2d sess. 
H. Doc. 550, 62d Cong., 2d 
sess. 
H. Doc. 1139, 64th Cong., 
1st sess. 
H. Doc. 481, 68th Cong., 2d 
sess. 
Rivers and Harbors 
Committee Doc. 1, 71st 
Cong., 1st sess. 
H. Doc. 46, 73d Cong., 1st 
sess. 
Rivers and Harbors 
Committee Doc. 54, 74th 
Cong., 1st sess. 
H. Doc. 352, 78th Cong., 1st 
sess. 
H. Doc. 151, 86th Cong., 1st 
sess.

BUFFALO, NY DISTRICT 
TABLE 32-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Oct. 23, 1962 
July 14, 1960 
as amended 
Nov. 17, 1986 
Aug. 13, 1968 
Mar. 3, 1875 
Aug. 5, 1886 
Aug. 11, 1888 
June 3, 1896 
Mar. 3, 1899 
June 13, 1902 
Mar. 2, 1907 
June 25, 1910 
Jul3. 7, 1916 
Aug. 8, 1917 
Aug. 29, 1937 
Aug. 30, 193512 
Deepening portion of outer harbor to 27 feet over a width of 500 
feet for 2,500 feet orthward from 28-foot project area, 
widening within 1,700 feet to limits within 150 feet of 
breakwater axis and 75 feet from harbor line and continuing 
within these limits for 7,000 feet. Elimination of 25-foot wide 
strip between presently authorized and proposed easterly 
dredging limits. Elimination of easterly 50-foot wide 
undredged strip in existing 23-foot depth project area, 
extending northerly from 27-foot depth area to Buffalo River 
entrance channel. Previously authorized but uncompleted 
portions of work authorized by 1935 act, combined with this 
act as a single improvement. 
Removal of abandoned abutments of South Michigan 
bridge. 
Replace dike at the Small Boat Harbor. 
CATTARAUGUS HARBOR, NY (See Section 4 of Text) 
Construction of arrowhead breakwaters at mouth of Creek; 
entrance channel 200 feet wide at lakeward end, 100 feet wide 
and eight feet deep from that depth in lake to point 1,575 feet 
upstream; channel 100 feet wide, six feet deep an additional 
3,425 feet upstream; and recreational fishing facilities at 
mouth. 
CLEVELAND HARBOR, OHIO (See Section 5 of Text) 
West breakwater. 
Part of east breakwater.9 
Extension of east breakwater. 
Reconstruction of piers.9 
Dredging channel between piers and outer harbor to depth of 19 
feet; dredging to depth of 23 feet in any portion of harbor in 
discretion of Secretary of War. 
Arrowhead breakwater and extension of east breakwater. 
Removal of deflecting arm of old east breakwater and closure of 
gap between old and new east breakwaters. 
-Pierhead at easterly end of east breakwater. 
Maintenance and improvement of channels in Cuyahoga and 
Old Rivers to a depth of 21 feet to a point 2,000 feet upstream 
from Clark Ave. viaduct and 18-foot turning basin. 
Deepening outer harbor and channel between piers to present 
project dimensions, construction of 400-foot spur breakwater 
at gap in shore arm of west breakwater; removal of easterly 
150 feet of west main breakwater; elimination from project of 
a 298-foot southerly extension of west pier; and abandonment 
of inner 932 feet of shore arm of west breakwater. 
32-29 
H. Doc., 451, 87th Cong., 2d 
sess. 
Sec. 107, PL 86-645. 
Authorized by Chief of 
Engineers Dec. 15, 1980 
Sec. 601, PL 99-662 
H. Doc. 97, 90th Cong., 1st 
sess. 
Annual Report, 1876, p. 558. 
H. Ex. Doc. 116, 48th Cong., 
2d sess., and Annual 
Report, 1886, p. 1865. 
H. Ex. Doc. 189, 50th Cong., 
2d sess., and Annual 
Report, 1883. p. 2005 
*H. Doc. 326, 54th Cong., 1st 
sess., and Annual Report, 
1896, p. 2949. 
H. Doc. 156, 55th Cong., 2d 
sess., and Annual Report, 
1899, pp. 3075 and 3078. 
H. Doc. 118, 56th Cong., 2d 
sess. 
No printed report. 
H. Doc. 891, 63d Cong., 2d 
sess. 
H. Doc. 707, 63d Cong., 2d 
sess., and Rivers and 
Harbors Committee Doc. 
84, 74th Cong., 2d sess. 
H. Doc. 477, 72d Cong., 2d 
sess.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 32-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 30, 193511 
Mar. 2, 194514 
July 24, 1946 
July 3, 1958 
July 14, 1960 
Oct. 23, 1962 
July 14, 1960 
as amended 
Oct. 22, 1976 
(Sec. 175) 
Nov. 17, 1986 
June 25, 1910 
Maintenance dredging in Cuyahoga and Old Rivers for 1 year as 
an emergency measure. 
Maintenance of extension of Cuyahoga River channel. 
Extension, maintenance, and improvement to a depth of 21 feet 
of Cuyahoga River channel to present project limit.',' 6 
Improvement of Cuyahoga and Old Rivers to a depth of 23 feet 
and replacement or pier construction of 7 railroad bridges.2 
Deepening channel 25 feet through east basin of outer harbor; 
replacement of Erie-Lackawanna Railroad bridge over 
Cuyahoga River at mile 4.1 and widening of channel at that 
point, with elimination of reconstruction of east pier of bridge 
as previously authorized; and replacement of Baltimore & 
Ohio Railroad Bridge over Old River near its mouth and Willow 
Avenue Highway Bridge about 800 feet above mouth and 
widening channel at four locations along lower 2,000 feet of 
river.3 
Depth of 29 feet in lake approach to main entrance; 28 feet in 
entrance channel to lakeward ends of piers at mouth of 
Cuyahoga River; 27 feet in river to a point just above its 
junction with Old River, and in Old River to upstream limit of 
present 23-foot project; 28 feet in west basin within existing 
project limits as modified to eliminate a triangular area at 
west end and to extend limits to a line parallel to and 75 feet 
from harbor line; and 28 feet in westerly 800 feet of east 
basin.25 
An area in east basin 27 feet deep extending about 3,800 feet 
easterly of 28-foot area with project limits 380 feet from east 
breakwater and on landward side generally by a line 75 feet 
lakeward of and parallel to harbor line. A dock channel to 
Nicholson Cleveland Terminal Co. pier, at easterly end of east 
basin, from 25-foot contour to a limit 75 feet north of pierhead 
line, 400 feet wide at shoreward end and flared toward the 
lake. 
Deepening upper end of Old River channel from 21 to 27 feet. 
Preparation of Phase I design memorandum for improvements 
consisting of removal of portions of entrance breakwater; 
construction of breakwater extension of east entrance; 
deepening approach and entrance channels; construction of 
diked disposal area; and, installation of recreational fishing 
facilities on west breakwater. 
Bulkheading and other necessary repairs at pier 34 and 
approach channels and necessary protective structures for 
mooring basins for transient vessels in the area south of pier 
34. 
CONNEAUT HARBOR, OHIO (See Section 6 of Text) 
Extension of east breakwater, construction of new west 
breakwater, removal of portion of old west breakwater, and 
dredging of outer harbor to 19 feet. 
Rivers and Harbors 
Committee Doc. 39, 74th 
Cong., 1st sess. 
Specified in act. 
H. Doc. 95, 79th Cong., 1st 
sess. 
H. Doc. 629, 79th Cong., 2d 
sess. 
H. Doc. 107, 85th Cong., 1st 
sess. 
H. Doc. 152, 86th Cong., 1st 
sess. 
H. Doc. 527, 87th Cong., 2d 
sess. 
Sec. 107, PL 86-645. 
Authorized by Chief of 
Engineers Dec. 6, 1966 
Sec. 202, PL 99-662 
H. Doc. 653, 61st Cong., 2d 
sess. 
32-30 
--

BUFFALO, NY DISTRICT 
TABLE 32-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Aug. 8, 1917 
17 
Aug. 30, 193511 
Oct. 23, 1962 
Nov. 7, 19668 
Mar. 2, 1827 
Mar. 2, 1867 
June 3, 1896 
June 25, 1910 
June 30, 1948 
Dec. 15, 1970 
(House Public 
Works Comm.) 
June 22, 1971 
(Senate Public 
Works Comm.) 
Sec. 201 of F.C. 
Act of 1965 
Nov. 17, 1986 
M.ay 26, 1824 
Realinement of west breakwater, removal of remainder of old 
west breakwater, and deepening outer harbor to 20 feet. 
Removal of Bessemer & Lake Erie R.R. Co. of inner 635 feet of 
west pier. 
Removal of a portion of west breakwater, extension of 
breakwaters to present project dimensions, construction of 
pierheads on outer ends of breakwaters, deepening 
outer harbor to present project dimensions; removal of 
portions of river pier, and elimination from project of a 255- 
foot shoreward extension of west breakwater. 
Deepening easterly part of outer harbor to 28 feet in soft 
material and 29 feet in hard material; deepening remaining 
triangular area of outer harbor to 22 feet in soft material and 
23 feet in hard material; deepening inner harbor for 2,450 feet 
upstream of outer end of west pier to 27 feet in soft material 
and 28 feet in hard material; removal of east pier, extension of 
east break water to shore; and an access channel 8 feet deep in 
outer harbor to city dock. Previously authorized but 
uncompleted portion of work authorized by 1917 and 1935 
acts combined with this act for accomplishment as a single 
improvement. 
Recreational small-boat harbor provided by: a stone dike about 
2,200 feet long: access channels 6 feet deep, 2,800 feet long and 
100 feet wide: closing of 100-foot gap in existing west 
breakwater; and personnel guard rail on west breakwater. 
DUNKIRK HARBOR, N.Y. (See Section 7 of Text) 
Construction of west pier.9 ,18 
Breakwater and excavation of entrance channel to 13 feet." 
Deepening of entrance channel and harbor basin to a depth 
suitable for vessels of 16-foot draft. 
Removal of rock reef bordering the inner entrance channel. 
Deepening outer entrance channel to present project depths; 
removal of rock shoal on the west side of the entrance channel 
to a depth of 17 feet, and changed limits of the inner entrance 
channel and basin to present project dimensions. 
Construction of small-boat harbor. 
Dredging and maintenance of eastern inner harbor. 
ERIE HARBOR, PA. (See Section 8 of Text) 
Breakwaters and piers; dredging entrance channel; and 
brushwood protection of beach of Presque Isle Peninsula.9 
H. Doc. 983, 64th Cong., 1st 
sess. 
H. Doc. 48, 73d Cong., 1st 
sess. 
H. Doc. 415, 87th Cong., 2d 
sess. 
H. Doc. 484, 89th Cong., 2d 
sess.4 
S. Ex. Doc. 42, 35th Cong., 1st 
sess., and Annual Report, 
1866 pt. IV, p. 155 
Annual Report, 1871, p. 214 
H. Doc. 63, 54th Cong., 1st 
sess. 
H. Doc. 720, 61st Cong., 2d 
sess.
4 
H. Doc. 632, 80th Cong., 2d 
sess. 
H. Doc. 91-423, 91st Cong., 
2d sess. 
Sec. 848, PL 99-662 
Annual Report, 1915, p. 
1965 
32-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 32-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 3, 1899 
June 15, 1910 
Nov. 28, 192220 
Aug. 30, 1935 
Mar. 2, 1945 
Sept. 3, 1954 
July 14, 1960 
Oct. 23, 1962 
Mar.. 3, 182521 
June 3, 1896 
Mar. 3, 1905 
Mar. 2, 1919 
Jan. 21, 1927 
July 3, 1930 
Aug. 30, 193522 
Aug. 26, 1937 
July 24, 1946 
Deepening channel and harbor basin to 18 feet; repair and 
extension of piers; and plant growth and emergency 
protection work on peninsula. 
Deepening channel and part of harbor to 20 feet. 
Reconveyed Presque Isle Peninsula to the State of Pennsylvania 
for park purposes. 
Deepening, widening, and straightening entrance channel, 
dredging channel at easterly end of harbor basin, deepening a 
portion of harbor basin, all to present project dimensions; 
elimination of north breakwater from project; and limitation 
of south breakwater to a length of 1,200 feet. 
Protection of the peninsula south of the waterworks settling 
basin. 
Widen 25-foot deep approach channel to ore dock. 
Depth of 29 feet in the entrance channel to a point opposite the 
inner end of the north pier; thence 28 feet in soft and 29 feet in 
hard material in the remainder of the entrance channel, 
within the general limits of the 25-foot basin and inner 
channel opposite the ore dock except as modified to eliminate 
from the project a triangular area along the easterly side; and 
a depth of 28 feet over a 300-foot westward extension of the 
25-foot basin. T 
Depth of 27 feet in soft material and 28 feet in hard material in 
approach area to Duquesne Marine Terminal. Previously 
authorized but uncompleted portion of work authorized by 
1935 act is combined with this act as a single improvement. 
FAIRPORT HARBOR, OHIO (See Section 9 of Text) 
Construction of piers. 
Breakwaters and dredging outer harbor to a depth of 18 feet. 
1,400-foot extension of east breakwater, present project 
dimension of east pier; and deepening of harbor to 19 feet. 
4,000-foot extension of east breakwater at limit of cost to the 
United States of $715,000. 
Deepening of outer harbor and entrance channel to present 
project dimensions; extending the west breakwater to present 
project dimensions with pierhead at its outer end; removal of 
west pier; and construction of bulkhead on west side of river 
channel. 
Dredging of 21- and 24-foot river channels and turning basin in 
Grand River to present project dimensions. 
Dredging of 8-foot river channel. 
H. Doc. 70, 55th Cong., 1st 
sess. and Annual Report, 
1896, p. 3237.'1 
Rivers and Harbors 
Committee Doc. 26, 61st 
Cong., 2d sess. 
H. Doc. 52, 73d Cong., 1st 
sess. 
Specified in act. 
H. Doc. 345, 83d Cong., 2d 
sess. 
H. Doc. 199, 86th Cong., 1st 
sess. 
H. Doc. 340, 87th Cong., 2d 
sess.4 
Annual Report, 1889, pp. 
2147-2153 
H. Doc. 347, 54th Cong.,lst 
sess. and Annual Reports, 
1896, p. 2956; 1903, p. 
2084; 1905, p. 2349. 
H. Doc. 206, 63d Cong., 1st 
sess. 
H. Doc. 592, 69th Cong., 2d 
sess., Rivers and Harbors 
Committee Doc. 13, 70th 
Cong., 1st sess. 
H. Doc. 472, 72d Cong., 2d 
sess. 
Rivers and Harbors 
Committee Doc. 79, 74th 
Cong., 2d sess.4 
H. Doc. 706, 79th Cong., 2d 
sess.4 
32-32

BUFFALO, NY DISTRICT 
TABLE 32-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 14, 196028 
May 10, 1977 
(House Public 
Works Comm.) 
Oct. 1, 1976 
(Senate Public 
Works Comm.) 
Sec. 201 of F.C. 
Act of 1965 
Oct. 27, 1965 
Mar. 2, 1829 
Aug. 2, 1882 
Mar. 3, 1925 
July 3, 1930 
Aug. 30, 1935 
Mar. 2, 1905 
Mar. 2, 1919 
Aug. 30, 193522 
Depth of 29 feet in the approach channel from the lake; a depth 
of 28 feet over a width of 800 feet in the outer harbor; a depth 
of 27 feet in soft and 28 feet in hard material in Grand River, 
over a width of 200 feet to the upstream limit of the turning 
basin, with suitable widening at the bends, thence over widths 
reducing from 200 to 100 feet to the upstream limit of the 
existing Federal project, except in the 8-foot channel; 
enlargement of the turning basin, including deepening of the 
entire basin to 21 feet; and minor modification of the existing 
project limits in the outer harbor. 
Construction of small boat harbor. 
GENEVA-ON-THE-LAKE, OHIO (See Section 10 of 
Text) 
Construction of breakwaters aggregating 1,350 feet in length; 
entrance channel about 730 feet long, 100 feet in width, 9 feet 
deep, inner channels 100 feet wide totaling 1,500 feet in length, 
and 6 feet deep; mooring area 0.5 acres in area with a depth of 
6 feet; development of recreational facilities; and development 
of wetland mitigation features. 
GREAT SODUS BAY HARBOR, N.Y. (See Section 11 of 
Text) 
Construction of piers and breakwater.9 
Extension of piers to 15-foot contour in the !stke. 
Deepening and widening of channel to 18-foot depth and 150- 
foot width. 
Widening channel lakeward of piers to 250 feet. 
Dredging channel to present project dimensions. 
HURON HARBOR, OHIO (See Section 12 of Text) 
Extension of west pier; construction of east breakwater; 
removal of part of old east pier; deepening of channel 19 
feet; and dredging of sheltered area. 
Widening river to 200 feet; removal of remainder of old east pier; 
construction of new spur pier; enlargement of sheltered area; 
and closure of beach at shore end of west pier. 
Extension of west pier with pierhead at its outer end; removal of 
outer end of east breakwater and constructing pierhead on 
new outer end; widening and deepening channel to present 
project dimensions; enlargement of turning basin at head of 
H. Doc. 347, 86th Cong., 2d 
sess.4 
H. Doc. 627, 94th Cong., 2d 
sess. 
H. Doc. 409, 
91st Cong., 
2d sess. 
Annual Report, 1876, pt.II 
p. 589. 
Annual Report, 1881, p. 
2442. 
H. Doc. 192, 68th Cong., 1st 
sess. 
Rivers and Harbors 
Committee Doc. 17, 70th 
Cong., 1st sess. 
Rivers and Harbors 
Committee Doc. 23, 72d 
Cong., 1st sess. 
H. Doc. 122, 58th Cong., 2d 
sess. 
H. Doc. 5, 63d Cong., 1st 
sess. 
H. Doc. 478, 72d Cong., 2d 
sess. 
32-33

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 32-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Oct. 23, 1962 
Jul. 3, 1958 
Aug. 30, 1852 
June 23, 1866 
Mar. 3, 1871 
Mar. 3, 1881 
June 13, 1902 
Mar. 3, 1899 
Mar. 2, 1907 
June 25, 1910 
-Aug. 8, 1917 
Aug. 8, 1917 
July 3, 1930 
Aug. 30, 1935 
Aug. 30, 1935 
Aug. 30, 1935 
channel; shore protection west of west pier, and elimination 
from project construction of spur pier and dredging sheltered 
area outside channel limits. 
Depths of 29 feet in approach channel, 28 feet in entrance 
channel, 27 feet in river channel, 21 feet in turning basin, a 
detached breakwater, 1,575 feet long 2,000 feet lakeward of 
outer end of existing west pier; and, abandonment of lakeward 
end of existing approach channel. 
IRONDEQUOIT BAY, NY (See Section 13 of Text) 
Construction of entrance channel 9 feet deep and 100 feet wide, 
extending from 9-foot depth in Lake Ontario to junction with 
inner bay channels, a distance of about 1,300 feet; inner 
channel, 8 feet deep and 100 feet wide, from entrance channel 
to deep water in bay, a distance of about 3,035 feet: access 
channel 8 feet deep, 100 feet wide, and 500 feet in length from 
the inner bay channel to the west; two stone rubblemound 
structures 1,350 feet and 750 feet in length at the natural 
entrance; and recreational facilities. 
LITTLE SODUS BAY HARBOR, N.Y. 
(See Section 14 of Text) 
West entrance pier.9 
Extension of west pier and construction of west breakwater, and 
dredging channel to 12 feet deep, 400 feet wide.9 
East pier and east breakwater.9 
Extension of piers lakeward to 15.5-foot contour, and dredging 
channel to 15.5 feet. 
Extension of east pier 300 feet lakeward. 
LORAIN HARBOR, OHIO (See Section 15 of Text) 
Breakwaters and extensions of piers to present dimensions. 
Extend 18-foot channel from inner end of piers to Erie Avenue 
Bridge. 
Extend breakwaters and dredge to depth of 19 feet in outer 
harbor. 
Extend breakwaters to present project dimensions. 
Deepen outer harbor and river channel to Erie Avenue Bridge to 
20 feet. 
Extend 20-foot channel to American Shipbuilding Co. drydock 2. 
Widen 2 bends in river and enlarge turning basin opposite 
National Tube Co. dock.12 
Approach channel to municipal pier. 
Deepen outer harbor and river channel to American 
Shipbuilding Co. drydock 2 to present project dimensions and 
extension of river channel to upper end of National Tube Co. 
dock with turning basin opposite that dock. Maintain dredging 
in Black River from American Shipbuilding Co. drydock 2 
H. Doc. 165, 87th Cong., 1st 
sess. 
4 
H. Doc. 332, 
84th Cong., 
2d sess. 
Annual Report, 1874, p. 256. 
Annual Report, 1874, p.256. 
Annual Report, 1871, p. 234. 
Annual Report, 1881, pp. 
2444 and 2446. 
Annual Report, 1901, 
p. 3364 
H. Doc. 131, 55th Cong., 2d 
sess., and Annual Report 
1898, p. 2718 
H. Doc. 560, 60th Cong., 1st 
sess. 
H. Doc. 644, 61st Cong., 2d 
sess. 
H. Doc. 980, 64th Cong., 1st 
sess. 
H. Doc. 985, 64th Cong., 1st 
sess. 
H. Doc. 587, 69th Cong., 2d 
sess. 
H. Doc. 469, 72d Cong., 2d 
sess. 
Senate Committee print, 
73d Cong., 2d sess. 
Rivers and Harbors 
Committee Doc. 51, 74th 
Cong., 1st sess. 
32-34 
_ ___ __ _ I_ _^_~---------------------L-DI-L~- ~ ' -- -~c--- -~r-~ U-3L .~-Y 

BUFFALO, NY DISTRICT 
TABLE 32-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
Mar. 2, 1945 
July 14, 1969 
Oct. 2, 1965 
July 14, 1960 
as amended 
Nov. 17, 1986 
Mar. 2, 1945 
June 25, 1910 
Mar. 2, 1919 
Aug. 30, 19351" 
July 14, 1960, 
as amended 
Mar. 2, 1867 
Mar. 4, 1913 
Nov. 17, 1986 
July 11, 1870 
Mar. 2, 1907 
upper end of National Tube Co. dock was authorized Apr. 7, 
1934, by Public Works Administration. 
Enlarging turning basin opposite National Tube Co. dock to 
present project dimensions. 
Turning basin in bend of Black River immediately upstream from 
Baltimore & Ohio RR coal dock. 
Replace Norfolk and Western Railway swing bridge with a 
vertical lift bridge; construct two detached arrowhead 
breakwaters lakeward of existing breakwaters; construct 
extension of east breakwater to shore; remove 300 feet of 
lakeward end of west breakwater; remove outer 1,100 feet of 
east pier; deepen lake approach to 29 feet, 800-foot wide 
outer harbor channel to 27 feet; widen river channel at bends; 
and construct a new turning basin 21 feet deep near upstream 
limit of existing project." 
Construct bank of stabilization works at cut numbered 1 along 
left bank of river channel above Erie Avenue Bridge.8 
Construction of a 225 foot detached rubblemound breakwater 
and an 800 foot long rubblemound breakwater attached to the 
east breakwater shorearm in the east basin of the outer 
harbor. 
Two bend cuts on Black River between the Norfolk and Western 
Railroad Bridge and 21st Street Bridge, excavated to existing 
channel depth of 27 feet. Widening Upper Turning Basin at 
existing authorized depth of 21 feet. 
OAK ORCHARD HARBOR, NY (See Section 16 of Text) 
Harbor of refuge. 
OGDENSBURG HARBOR, N.Y. (See Section 17 of Text) 
Deepening the several channels to 19 feet. 
Widening upper entrance channel to 400 feet, and city front to 
350 feet. 
Enlarging and deepening lower basin to 21 feet, and removal of 
elevator wharf. 
Extend Lower East Entrance Channel, 600 feet west of existing 
pier to a depth of 27 feet below LWD. Dredged material to be 
disposed of in dredged disposal area site 5, owned by 
Ogdensburg Bridge and Port Authority. 
OLCO'T HARBOR, N.Y. (See Section 18 of Text) 
Dredging a channel 11 feet deep between parallel piers.' 
Deepening channel to 12 feet and maintenance of west pier. 
Construct the project for Navigation, Repoit of the Chief of 
Engineers dated June 11, 1980. 
OSWEGO HARBOR N.Y. (See Section 19 of Text) 
Construction of outer west breakwater. 
Repair of outer west breakwater under Plan (A).9 
Specified in act. 
H. Doc. 161, 77th Cong., 
1st sess. 
H. Doc. 166, 86th Cong., 
1st sess.4 
PL 89-298 
Sec. 107, PL 86-645. 
Authorized by Chief 
of Engineers 
Mar. 12, 1986. 
Sec. 202, 
PL 99-662 
H. Doc. 446, 
78th Cong., 2d sess. 
H. Doc. 920, 60th Cong., 
1st sess. 
H. Doc. 663, 64th Cong., 
1st sess. 
H. Doc. 266, 72d Cong., 
1st sess. 4,24 
Section 107, PL 86-645. 
Authorized by Chief of 
Engineers Apr. 20, 1983. 
Annual Report, 1866, pt.III, 
p. 15 and pt. IV, p. 158. 
H. Doc. 780, 62d Cong., 
2d sess.4 
Sec. 601, 
PL 99-662 
Annual Report, 1870, pp. 54, 
220 and 221. 
H. Doc. 55, 58th Cong., 
2d sess. 
32-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 32-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
July 3, 1930 
Aug. 30, 1935 
Oct. 17, 1940 
4une 30, 1948 
Sept. 3, 1954 
Oct. 23, 1962 
Mar. 2, 1945 
Nov. 17, 1986 
Mar. 2, 1829 
Aug. 2, 1882 
June 25, 1910 
Aug. 30, 19356 
Mar. 2, 1945 
July 14, 1960 
Construction of arrowhead breakwaters; deepening outer 
harbor between arrowhead breakwaters; west outer harbor 
east of Erie-Lackawanna coal dock, and Oswego River north of 
Seneca St., to 21 feet; and deepening west outer harbor, west of 
Erie-Lackawanna coal dock, to 16 feet.32 
Widening channel to harbor lines in Oswego River north of 
Seneca Street. 
Closing gap in west breakwater; deepening west outer harbor, 
west of east line of Erie-Lackawanna coal dock, to project 
depth.33 
Construction of east outer breakwater; removal of inner end of 
east arrowhead breakwater; and dredging channel and basin 
in east outer harbor.34 
Construction of detached breakwater at harbor entrance and 
removal of shoals in approach to harbor entrance to 25 feet 
deep. 
Depth of 27 feet in lake approach channel; 25 feet deep in outer 
harbor channel 800 feet wide from entrance gap to a turning 
basin 25 feet deep about 750 by 1,100 feet, at mouth of Oswego 
River; depth of 24 feet in earth and 25 feet in hard material in 
river channel from turning basin to upstream end of Port of 
Oswego Authority's east side terminal, a distance of about 
1,600 feet; relocation of Federal project limits in Oswego River 
upstream of 24-foot channel to Federal project limit at north 
line of West Seneca St., on lines parallel to 50 feet channel ward 
of established harbor lines; elimination of maintenance of 
inner west breakwater; and, elimination of modification 
authorized by River and Harbor Act of 1948. 
PORT ONTARIO, NY(See Section 20 of Text) 
Construct harbor of refuge. 
Maintain harbor of refuge. 
ROCHESTER HARBOR, N.Y. (See Section 21 of Text) 
Construction of piers.? 
Extension of piers to 15 foot contour in the lake. 
Concrete superstructure on piers.' 
Deepening channel to 20 feet. 
Dredging of the entrance channel and turning basin, and the 
elimination of the inner ends of the east and west piers, all to 
present project dimensions. 
Maintenance of existing channel upstream of the Penn Central 
Co. bridge. 
Depth of 24 feet in the channel front the lake to the west pier; a 
depth of 23 feet between the piers and in the lower river to the 
Penn Central Co. bridge, including the existing turning basin; a 
depth of 21 feet from the bridge to the upstream project limit, 
with suitable widening at the bends; and, upstream turning 
basin 21 feet deep and 650 feet wide adjacent to the improved 
channel, with two mooring dolphins. 
Rivers and Harbors Committee 
Doc. 24, 71st Cong., 
2d sess. 
Rivers and Harbors Committee 
Doc. 7, 74th Cong., 
1st sess. 
H. Doc. 96, 76th Cong., 
1st sess. 
H. Doc. 722, 80th Cong., 
2d sess. 
H. Doc. 487, 81st Cong., 
2d sess. 
H. Doc. 471, 87th Cong., 
2d sess. 
H. Doc. 446, 78th Cong., 
2d sess. 
Sec. 615, 
PL 99-662 
Annual Report, 1874, p. 247 
Annual Report, 1881, p. 2437 
Annual Report, 1905, p. 
2383 
H. Doc. 342. 61st Cong., 
2d sess. 
H. Doc. 484, 72d Cong., 
2d sess. 
H. Doc. 139, 76th Cong.. 
1st sess. 
H. Doc. 409, 86th Cong., 
2d sess.4 
32-36

BUFFALO, NY DISTRICT 
TABLE 32-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
June 10, 1872 
Aug. 26, 1937 
Oct. 27, 1965 
Mar. 3, 1899 
June 13, 1902 
Mar. 2, 1919 
Jan. 21, 1927 
Aug. 30, 19352 
Mar. 2, 1945 
July 14, 1960 
Mar. 3, 1899 
June 25, 1910 
Aug. 30, 1935 
ROCKY RIVER HARBOR, OHO ' (See Section 22 of 
Text) 
Eas. pier and dredging of chand. 
Extension of east pier and deepening channel to present project 
dimensions. 
Realign and extend channel and construct an anchorage basin. 
SANDUSKY HARBOR, OHIO (See Section 23 of Text) 
Construction of channel protection works. 
Widening of straight and dock channels and deepening to 19 
feet. 
Extension of east jetty to total length of 6,000 feet, with pierhead 
on outer end; deepening of the outer, straight, and easterly 
portion of dock channels to 21 feet, and westerly portion of 
dock channel to 20 feet. 
Deepening of dock channel to 22 feet. 
Enlargement of turning basin and construction of rock dike. 
Maintenance of bay channel to 22 feet; and elimination from 
project of portion of turning basin and rock dike. 
Extending Moseley channel and deepening that channel and the 
outer end of Straight channel to 26 feet, from deep water in the 
lake to the vicinity of Cedar Point dock; widening the bend at 
the junction of the Moseley and Straight channels and 
deepening to 26 feet; deepening the Straight channel to 25 feet 
from the vicinity of Cedar Point dock to juction with Bay 
channel; deepening the Bay channel from the junction with 
the Straight channel to the outer end of the Pennsylvania Coal 
dock No. 3 to 25 feet, thence from outer end of the coal dock to 
the turning basin to 24 feet in soft material and 25 in hard, 
with no Federal dredging within 50 feet of the dock; and 
enlarging the turning basin, including removal of 
approximately 300 feet of the rock dike, and deepening to 24 
feet in soft material and 25 feet in hard. 
TOLEDO HARBOR, OHIO (See Section 24 of Text) 
A channel 400 feet wide and 21 feet deep from 25-foot contour in 
Maumee Bay to Fassett Street Bridge, 200 feet wide and 19 feet 
deep above that point and a 500-foot turning basin at Upper 
End. A stone revetted earth dike in Maumee Bay Channel. 
Act 1899 modified to insure a navigable channel to 21 feet from 
Fassett Street Bridge to Lake. 
Channel 25 feet deep and 500 feet wide from 25-foot contour to 
mouth of Maumee River (300 feet wide on each side of center 
dike in Bay Channel), thence 400 feet wide to Fassett Street 
Bridge, 200 feet wide above that point and a turning basin at 
Upper End 18 feet deep. 
Annual Report, 1871, p. 211 
H. Doc. 70, 75th Cong., 
1st. sess. 
H. Doc. 352, 88th Cong., 
2d sess.4 
H. Doc. 362, 55th Cong., 
2d sess., and annual 
Report 1898, p. 2708 
H. Doc. 120, 56th Cong., 
2d sess. 
H. Doc. 982, 64th Cong., 
1st sess. 
H. Doc. 584, 69th Cong., 
2d sess. 
Rivers and Harbors 
Committee Doc. 2, 73d 
Cong., 1st sess. 
H. Doc. 328, 76th Cong., 
1st sess. 
H. Doc. 144, 86th Cong., 
1st sess. 4 
H. Doc. 198, 55th Cong., 2d 
sess. and Annual Report 
1898, p. 2693 
H. Doc. 865, 60th Cong., 
1st sess. 
Rivers and Harbors 
Committee Doc. 21, 72d 
Cong., 1st sess. 
32-37

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 32-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
May 17, 1950 
Sept. 3, 1954 
July 3, 1958 
July 14, 1960 
Oct. 27, 1965 
Sep. 3, 1954 
Oct. 22, 1976 
Nov. 17, 1986 
Sept. 3, 1954 
July 14, 1960 
Mar. 7, 1974 
Oct. 22, 1976 
(Sec. 101) 
Nov. 17, 1986 
Dec. 31, 1970 
Mar. 7, 1974 
Dec. 22, 1944 
Nov. 7, 1966 
Widening at bend of mouth of River opposite Chesapeake and 
Ohio Railway Dock. 
Removal of center dike in Maumee Bay Channel. 
Enlarge widening at bend opposite Chesapeake and Ohio dock 
and turning basin opposite American Shipbuilding Co. dock. 
Deepen Bay Channel including widenings to 28 feet, deepen 
River channels to New York Central Railroad Bridge to 27 feet 
and construct new turning basin below Anthony Wayne 
Bridge.31 
WEST HARBOR, OHIO (See Section 25 of Text) 
Construction of arrowhead breakwaters entrance channel, and 
access channel. 
LAKEVIEW PARK, LORAIN, OHIO 
(See Section 29 of Text) 
Construction of offshore breakwaters, alteration and extension 
of groins, and placement of beachfill. 
Periodic beach nourishment through 1992. 
MAUMEE BAY STATE PARK, OHIO 
(See Section 30 of Text) 
Protective sand beach stabilized by rubblemound offshore 
breakwaters and jetties along the west half of shoreline 
and rubblemound revetment at the east end of the park. 
PRESQUE ISLE PENINSULA, ERIE, PA. 
(See Section 31 of Text) 
Construction of groin system, seawall, bulkhead, placement of 
beach material at waterworks reservation and along 
remainder of peninsula; removal of portions of existing 
structures. 
Periodic nourishment of shore for a 10-year period. 
Periodic nourishment of shore for a 5-year period. 
Preparation of Phase I design memorandum for improvements 
consisting of construction of five sections of spaced offshore 
breakwaters and replenishment of beach area with sandfill. 
Construct offshore breakwaters and restore beaches. 
ELLICOTT CREEK, NY (See Section 34 of Text) 
Widening, straightening and deepening channel in Ellicott Creek 
Park; construct diversion channels; construct 3 highway 
bridges; modify culverts; modify utilities and drainage outlets; 
and construct recreation facilities. 
MT. MORRIS LAKE, NY, GENESEE RIVER 
(See Section 35 of Text) 
Construction of a concrete gravity dam and reservoir. 
OTTAWA, OHIO (See Section 36 of Text) 
Construction of levees, floodwalls, combined with channel 
improvement, bridge change, and construction of new bridges. 
H. Doc. 189, 
1st sess. 
H. Doc. 620, 
2d sess. 
H. Doc. 436, 
2d sess. 
H.Doc. 153, 
1st sess.4 
81st Cong., 
81st Cong., 
84th Cong., 
86th Cong., 
H. Doc. 245, 
88th Cong., 
2d sess. 
H. Doc. 224, 83rd Cong., 
1st sess. 
Sec. 156, PL 94-587 
Sec. 501, PL 99-662 
H. Doc. 231, 81st Cong., 
1st sess. 
H. Doc. 397, 
2d sess. 
H. Doc. 796, 
2d sess. 
86th Cong., 
93rd Cong., 
Sec. 501, PL 99-662 
Sec. 201, 
PL 91-611 
Sec. 14, 
PL 93-251 
H. Doc. 615, 
2d sess. 
H. Doc. 485, 
89th Cong. 
78th Cong., 
32-38

BUFFALO, NY DISTRICT 
TABLE 32-B (Continued) AUTHORIZING LEGISLATION 
Acts Work Authorized Documents 
POINT PLACE, TOLEDO, OHIO (See Section 37 of Text) 
Construction of steel sheet pile wall, 
levees, pumping stations, storm sewer 
facilities, and gravity outfalls. 
RENO BEACH -HOWARD FARMS AREA, OHIO (See Section 38 of Text) 
Construction of dike and levees. 
CONESUS LAKE, LIVONIA, NY (See Section 42 of Text) 
Jun. 30, 1948, 
as amended. 
Construction of sheetpiling, concrete control 
structure, outlet channel, and creek channelization. 
Sec. 205, PL 858. 
Authorized by 
Chief of Engineers 
July 22, 1985. 
EUCLID CREEK, CLEVELAND, OHIO (See Section 42 of Text) 
Jun. 30, 1948, 
as amended. 
Construction of diversion channel, levees. 
and creek channelization. 
Sec. 205, PL 858. 
Authorized by 
Chief of Engineers 
Oct. 9, 1981. 
32-39 
Oct. 27, 1965 
Jun. 30, 1948 
H. Doc. 363, 
92nd Cong., 
2d sess. 
H. Doc. 554, 
80th Cong., 
2d sess. 
~s -p~~ _ __ _ _LI- -I-~-I--- - _ -____ ~_~UIUlllllll~--~41

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 32-B (Continued) 
1. Authorized by Public Works Administration, Sept. 6, 
1933. 
2. Widening Cuyahoga River downstream at end of Cut 4 
classified inactive. 
3, Replacement of bridges 19 and 32, widening Cuyahoga 
and Old River Channels, classified deferred. 
4. Contains latest published map. 
5. Permanent Appropriations Repeal Act. 
6. Authorized May 28, 1935 by Emergency Relief 
Administration Act of 1935. 
7. Improvement of guide pier at Black Rock Lock was 
deauthorized by Congress in August 1977. 
8. Classified deferred. 
9. Completed under previous projects. 
10. Also Sundry Civil Act of Mar. 3, 1905. 
11. Authorized in part by Public Works Administration, 
Sept. 6, 1933. 
12. Authorized by Public Works Administration Sept. 6, 
1933.
13. Previously authorized by Public Works 
Administration. 
14. First Deficiency Appropriations Act approved April 1, 
1944.
15. Authorized by Defense Plant Corp., May 19, 1942. 
16. Deepening left half of channel extension was 
eliminated from project by 1962 R&H Act. 
AUTHORIZING LEGISLATION 
17. Permit of Secretary of War, Aug. 5, 1927. 
18. Modified 1828 and 1852. 
19. Extension of north pier portion of this modification 
was deauthorized Nov. 81. 
20. Public Law 366. 
21. Modified 1830, 1881, and 1890. New work completed 
under previous projects. 
22. Partly included in Public Works Administration 
program, Nov. 15, 1933. 
23. First Supplemental national Defense Appropriation 
Act, 1944, approved Dec. 23, 1943. 
24. Removal of remaining hard-material shoals in lower 
basin was deauthorized Nov. 17, 1986. 
25. Deepening remainder of Cuyahoga River from bridge 1 
to and including Old River , classified deferred. 
26. Included in Public Works Administration program, 
Nov. 15, 1933. 
27. Deepening strips adjacent to north and south piers 
was deauthorized Aug. 82. 
28. Modification classified inactive. 
29. Construction of breakwater classified deferred. 
30. Deepening and widening remainder of Black River 
channel at Cut 1 classified deferred. 
31. The 27-foot project extended 2,800 feet and turning 
basin relocated under authority of Chief of Engineers. 
32. Deepening a 200-foot strip along harbor line east of 
mouth of Oswego River is classified inactive. 
33. Deepening to 22 feet a 150-foot wide strip in west outer 
harbor deauthorized in May 1981. 
34. Modification eliminated by River and Harbor Act of 
Oct. 26, 1962. 
32-40 
___ __ -- I--- -e I 
- I--- I -- -- -- - ~- -- ----- - - I ----- I- -- ------ I - - - II-- - - I- - ----- --- --- I --

BUFFALO, NY DISTRICT 
TABLE 32-C OTHER AUTHORIZED NAVIGATION PROJECTS 
(See Section 27 of Text) 
Cost to September 30, 1987 
For Last 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Barcelona Harbor, N.Y. Completed 1985 1,185,853' 7 1,921,187 
Big (Cunningham) Creek, Ohio' Completed _2 19,763 - 
Black River Harbor, N.Y.' _ _2 42,401 - 
Cape Vincent Harbor, N.Y. Completed 1962 275,082 1,562,244 
Cattaraugus Creek, N.Y _ _2 57,410 - 
Elk Creek Harbor, Pa. Active 1978 101,500 
Grasse River (Massena), N.Y.4,7 _ 1891 9,0003 
Hamlin Beach Harbor, N.Y.6 Deferred 1973 72,052 
Kelleys Island, Ohio Active 1974'" 129,874 
Little River at 
Cayuga Island, N.Y.9 Completed 1969 46,804s 42,393 
Morristown Harbor, N.Y.' Completed 1949 6,221 9,694 
Niagara Remedial Works, N.Y.9,'0 Completed 1966 6,069,395 510,819 
Niagara River, N.Y.'," Completed 1964 559,45711 141,059 
Ottawa River Harbor, Michigan 
and Ohio" Inactive 1977's 99,000 - 
Port Bay, N.Y. Active - - 
Port Clinton harbor, Ohio Completed 1985 71,950 909,869 
Pultneyville Harbor, N.Y.'3 - 1934 68,219 20,087 
Put in Bay, Ohio Completed 1951"' 51,609 12,720 
Sackets Harbor, N.Y. Completed 1982 25,010 24,023 
Sandusky River, Ohio' 1894 58,0003 557 
Vermilion Harbor, OH Completed 1986 1,295,893"8 1,980,816 
Wilson Harbor, NY Completed 1986 535,42619 492,62920 
1. No commerce reported. 
2. Only information available is in index to reports of Chief of 
Engineers. 
3. Amount includes maintenance; not separable. 
4. Abandonment recommended in H. Doc. 467, 69th Cong., 1st 
sess. 
5. Abandonment recommended in Ex. Doc. 16, 35th Cong., 1st 
sess. 
6. Project classified deferred. 
7. Channel improved by local interests. 
8. Includes local interests contribution of $25,742. 
9. Completed. 
10. Costs of operation and maintenance of this project will be 
settled directly by concerned power agencies. No further 
appropriations will be made to this project. 
11. Includes local interests contribution of $27,563. 
12. Includes local interests contribution of $5,000. 
13. Abandonment recommended in H. Doc. 375, 64th Cong., 
1st sess. 
14. Project classified inactive. 
15. Annual Report for Detroit District. 
16. Construction of compensating works as authorized by 
1930 R&H Act was deauthorized by Congress in August 1977. 
17. Includes $56,616 for previous projects. Excludes $181,500 
contributed funds. 
18. Excludes $740,649 contributed funds. Includes $139,775 
for rehab. 
19. Includes $57,342 for previous projects. Excludes 
$166.998 contributed funds. 
20. Includes $16,914 for previous projects. 
32-41

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
OTHER AUTHORIZED BEACH EROSION 
TABLE 32-D CONTROL PROJECTS 
(See Section 32 of Test) 
Cost to September 30, 1987 
For Last 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Cleveland and Lakewood, Ohio: 
Edgewater Park' Deferred 
White City Park' Deferred 
Fair H:aven Beach State Park, 
Lake Ontario, N.Y.2 
Fort Niagara State Park, N.Y.3 Active 
Hamlin Beach State Park, N.Y.& Completed 1976 $1,769,600 
Selkirk Shore State Park, 
Lake Ontario, N.Y.4 Deferred 1963 58.978 $2,946 
1. Project authorized by River and Harbor Act of 
September 3, 1954 is classified as deferred. 
2. Project authorized by River and harbor Act of July 3, 
1958 is classified as deferred. 
3. Project authorized under provision of Section 201,1965 
Flood Control Act has been reclassified as active. 
4. Federal participation was limited to one-third of first 
cost when project was authorized by 1954 River and Harbor 
Act. Federal participation was changed from one-third to 70 
percent of remaining work under Public Law 87-874. 
Uncompleted portion of project is classified as deferred. 
5. Project completed. 
32-42

BUFFALO, NY DISTRICT 
TABLE 32-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(See Section 41 of Text) 
Cot to September 30, 1987 
For Last 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Auburn, N.Y. Owasco Outlet' 
Batavia and vicinity, Tonawanda 
Creek, N.Y.' 
Caledonia, Genesee River, N.Y. 
Camp Perry, Ohio' 
Cayuga Creek, Cheektowga, 
N. Y. L', 
Chittenango Creek and 
tributaries, N.Y.2,3 
Cuyahoga River Basin, Ohio 
Dansville and vicinity, 
Canaseraga Creek, N.Y. 
East Lake, Ohio, Chagrin River3 
Fremont, Ohio, Sandusky River' 
Ithaca, N.Y., Cayuga Inlet, N.Y.' 
Lackawanna, N.Y., Smokes 
Creek' 
Lancaster, Cayuga Creek, N.Y.' 
Marsh Creek, Geneva, N.Y. 5 
Montour Falls, Oswego River 
Basin, N.Y.' 
Onandaga Creek, Nedrow, N.Y.', 5 
Owasco Inlet and Outlet, 
Montville and Dry Creek, State 
Ditch and Crane Brook, N.Y.' 
Scajaquada Creek, N.Y.' 
Syracuse, Oswego River Basin, 
N.Y.' 
Warsaw, N.Y., Oatka Creek', 5 
Wellsville, N.Y., Genesee River' 
Completed 
Completed 
Deferred 
Completed 
Completed 
Inactive 
Active 
Active 
Inactive 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Inactive/Deferred 
Completed 
Completed 
Completed 
Completed 
1. Completed. 
2. Local interests required to contibute $25,000. 
3. Project is not considered economically justified and is 
inactive. 
4. Inactive portion of work for State Ditch has been done by 
local interests and work on Crane Brook has been deferred at 
the request of local interests. 
5. Project authorized by Chief of Engineers. 
6. Excludes costs of $188,732 under Public Law 84-99, Flood 
Control and Coastal Emergencies Appropriation, incurred for 
project rehabilitation as a result of damages due to storm 
Agnes, June 1972. 
7. Includes local interests contribution of $50,000. 
8. Excludes costs of $26,807 under Public law 84-99, Flood 
Control and Coastal Emergencies Appropriation, incurred for 
project rehabilitation as a result of damages due to storm 
Agnes, June 1972. 
9. Includes local interests contribution of $6,944. Excludes 
costs of $383,786 under Public Law 84-99, Flood Control and 
Coastal Emergencies Appropriation, for emergency 
restoration of levees damaged during 1973. 
10. Includes local interests contribution of $125,000. 
11. Annual Report for Detroit District. 
12. Includes local interests contribution of $99,000. Excludes 
costs of $104,005 under Public Law 84-99, Flood Control and 
Coastal Emergencies Appropriation, incurred for project 
rehabilitation as a result of damages due to storm Agnes, June 
1972. 
13. Includes local interests contribution of $50,000. Excludes 
costs of $374,042 under Public Law 84-99, Flood Control and 
Coastal Emergencies Appropriation, incurred for project 
rehabilitation as a result of damages due to storms. 
32-43
1962 
1957 
1950 
19671t 
1984 
1948 
1985 
1985 
1976 
1976 
1978 
1971 
1954 
1954 
1964 
1950 
1985 
1954 
1969 
1978 
371,9856 
335,385 
275,00010 
1,404,500 
12,464 
1,117,000 
490,300 
506,344 
8,589,8248 
3,929,33012 
3,542,0687 
797,300 
226,429 
1,681,785 
330,231 
281,559 
4,944,852 
3,349,248 
558,3178 
3,145,30313 
_ _

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 32-G NAVIGATION WORK UNDER SPECIAL AUTHORIZATION 
(See Section 28 of Text) 
Navigation Activities Pursuant to Section 107, Public Law 86-645 
(Preauthorization) 
Study Identification 
Cooley Canal, Lucas Co., OH 
Edgewater Marina, Cleveland, OH 
Huron Harbor, OH 
Lake Erie, Sheffield, OH 
Lake Erie, Sturgeon Point, NY 
Little River, Niagara Falls, NY 
NFT'A-Sm. Boat Hbr.,Buffalo, NY 
North Sandy Pond, Oswego Co., NY 
Toussaint River, Carrol Twsp.,OH 
Fiscal Year Cost 
-3 
1,308 
6,863 
64 
167,117 
7,416 
174 
7,500 
8,577 
32-44

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 32-H FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
(See Section 42 of Text) 
Flood Control Activities pursuant to Sec. 205, 
Public Law 858, 80th Congress as amended (preauthorization) 
Study Identification 
Baldwin Creek, N. Royalton, OH 
Buffalo River, W. Seneca, NY 
Butternut Creek, Dwitt, NY 
Canandaigua Lake. NY 
Canadaway Creek, Fredonia, NY 
Cazenovia Creek, Buffalo, NY 
Chittenango Creek, Sullivan, NY 
Cross Lake, NY 
Ellicott Creek, Lehn Springs, NY 
Keuka Lake Outlet, NY 
Limestone Creek, Fayetteville, NY 
Maumee River, Defiance, OH 
Muddy Creek, Evans, NY 
Oneida Creek, Oneida, NY 
Oneida Lake, NY 
Owasco Inlet, Groton, NY 
Plum Creek, Columbia Station, OH 
Swan Creek, Toledo, OH 
Wightman's Grove, Sandusky, OH 
W. Br. Limestone Creek, Manlius, NY 
Fiscal Year Cost 
$3,000 
20,131 
23,535 
41,157 
15,019 
109,306 
45,928 
13,544 
9,684 
9,631 
15 
36,756 
2,473 
13,923 
14,368 
7,500 
16,255 
84,860 
2,300 
25,053 
Emergency bank protection (Sec. 14 of 1946 Flood Control Act, 
Public Law 526, 79th Cong.) 
Study Identification 
Canadaway Creek, Fredonia, NY 
Chagrin River, East Branch, Baldwin Rd., OH 
Chagrin River, East Branch, Sperry Rd., OH 
Chagrin River, East Branch, SR 615, OH 
Cuyahoga River, Akron, OH (Sewer) 
Cuyahoga River, Brecksville Rd., OH 
Cuyahoga River, North Portage Path, Akron, OH 
Cuyahoga River, Riverview Rd., Northhampton, OH 
Lake Erie, Domonakas Library, Sheffield Lake, OH 
Lake Erie at Fredonia, Sewer Outfall, NY 
Lake Erie, Linwood Park, Vermilion, OH 
Lake Erie, Middle Bass Island, Put-in-Bay, OH 
Lake Erie State Park, Brocton, NY 
Lake Erie, SR 163, Port Clinton, OH 
Lake Erie, SR 531, Geneva, OH 
Lake Erie, Sturgeon Pt., Evans, NY 
Lake Erie, Walnut Blvd., Ashtabula, OH 
Lake Ontario, Lake Rd., Webster, NY 
Lake Ontario State Parkway, Orleans Co., NY 
Mill Creek, Warner Rd., Garfield Heights, OH 
Seneca Lake, Watkins Glen, NY 
Seneca River, Seneca Falls, NY 
St. Lawrence River, Shotbag Island, Clayton, NY 
Sugar River, Lower James Rd., NY 
Sugar River, WWTP, Constableville, NY 
Thatcher Brook, Gowanda, NY 
Fiscal Year Cost 
$505 
61,670 
8,479 
70,545 
4481 
9,958 
18,047 
7,870 
2,969 
9,809 
17,594 
7,500 
12,711 
7,500 
104,741 
1,000 
7,500 
949 
3,000 
7,500 
24,457 
116,864 
6,600 
6,500 
4,500 
2,191 
1. Does not include $3,248 in contributed funds. 
32-45

BUFFALO, NY DISTRICT 
DEAUTHORIZED PROJECTS 
TABLE 32 (See Section 43 of Text) 
FFoorr LLaasstt Federal Full Contributed Report Date Funds Funds See Annual 
Report For Deauthorized Expended Expended 
Black Rock Channel and 
Tonawanda Harbor, NY 
1935 R&H Act' 1962 Aug 1977 
Black Rock Channel and 
Tonawanda Harbor, NY - - 
1954 R&H Act 1962 May 1981 
Cape Vincent Harbor, NY 
1945 R&H Act 1962 Nov 1986 
Crane Creek State Park, OH Nov 1979 
1962 R&H Act 19683 
Erie Harbor, PA 1945 R&H Act 1963 Aug 1977 
Erie Harbor, PA 1899 R&H Act 1963 Nov 1981 
Erie Harbor, PA 1960 R&H Act 1963 Aug 1982 
Grandview Bay Harbor, NY 
1945 R&H Act 1948 Aug 1977 $1,524 
Great Sodus Bay Harbor, NY 
1962 R&H Act 1963 Aug 1977 
Hammondsport, Oswego River 
Basin, NY 1941 FC Act 1951 Nov 1983 29,000 
Ithaca, NY-Cascadilla Creek 
1941 FC Act 1950 Aug 1977 8,159 
Ithaca, NY-Fall Creek 
1941 FC Act 1950 Aug 1977 12,300 - 
Maumee River, above Toledo, OH 
1872 Act 19713 Nov 1977 12,000 
Niagara River, Compensating Works, 
NY 1930 R&H Act 1964 Aug 1977 -- 
Ogdensburg Harbor, NY 
1935 R&H Act 1986 Nov 1946 - 
Oswego Harbor, NY 1940 R&H Act2 1963 May 1981 - 
Red Creek, NY 1966 FC Act 1975 Nov 1986 361,241 
Sackets Harbor, NY 
1945 R&H Act 1948 May 1981 19,010 
Sheffield lake Community Park, 
OH 1962 R&H Act - Aug 1977 -- 
Watkins Glen, NY 1941 FC Act 1958 Aug 1977 43,182 
1. Extension of guide pier only; other improvements 
completed. 
2. Deepening of west outer harbor, other improvements 
completed. 
3. Annual Report for Detroit District. 
32-46

LOS ANGELES, CA, DISTRICT * 
This district (total area, about 230,000 square miles) 
comprises those drainage basins tributary to the Pacific 
Ocean that are in California between the Mexican 
boundary and Cape San Martin (about 265 miles north 
of entrance to Los Angeles Harbor); lower Colorado 
River drainage basin (below Lee Ferry, AZ), which is in 
southeastern California, southeastern Nevada, southwestern 
Utah, and all of Arizona, except the northeastern 
corner; that part of the Great Basin that is in 
southern Nevada and southeastern California; and the 
United States parts of those small drainage basins in 
southern Arizona that drain southward into Mexico. 
IMPROVEMENTS 
Navigation Page 
1. Channel Islands Harbor, CA ........... 33-2 
2. Los Angeles and Long Beach 
Harbors, CA .......................... 33-2 
3. Marina del Rey, Los Angeles 
County, CA ......................... 33-2 
4. Morro Bay Harbor, CA .............. 33-3 
5. Oceanside Harbor, CA ................ 33-3 
6. Port Hueneme, CA .................... 33-3 
7. San Diego Harbor, CA .............. 33-3 
8. San Diego River and Mission 
Bay, CA .............................. 33-4 
9. Santa Barbara Harbor, CA ............ 33-4 
10. Ventura Marina (Ventura 
Harbor), CA .......................... 33-4 
11. Reconnaissance and condition 
surveys .......................... 33-4 
Flood Control 
12. Alamo Lake, Bill Williams 
River, AZ .......................... 33-4 
13. Cucamonga Creek, Santa Ana 
River Basin, CA ................... 33-5 
14. Gila River Basin, AZ: ............... 33-5 
14A. Painted Rock Dam (Gila 
River), AZ .......................... 33-5 
14B. Phoenix, AZ, and vicinity 
(including New River) .............. 33-5 
14C. Whitlow Ranch Dam, Queen 
Creek, AZ .......................... 33-6 
15. Los Angeles County drainage 
area, CA ............................. 33-6 
16. Los Coches Creek, San Diego 
County, CA ......................... 33-7 
17. Lytle and Warm Creeks, Santa 
Ana River Basin, CA .................. 33-7 
18. Mojave River Dam, Mojave 
River Basin, CA ..................... 33-7 
19. Pine and Mathews Canyons Dams, 
Colorado River Basin, NV ............ 33-7 
20. San Luis Rey River, San 
Luis Rey River Basin, CA ............ 33-7 
21. Santa Ana River Basin (and 
Orange County), CA ................ 33-8 
22. Sweetwater River, Sweetwater 
River Basin, CA ..................... 33-8 
Flood Control (Cont'd) 
23. West Magnesia Canyon channel, 
Rancho Mirage, CA ................... 
24. Inspection of completed flood 
control projects ....................... 
25. Scheduling flood control reservoir 
operations ............................ 
26. Flood control work under 
special authorization .................. 
General Investigations 
27. Surveys .............................. 
28. Collection and study of basic 
data .................................. 
29. Research and development ............ 
30. Preconstruction engineering 
and design ........................... 
30A. Goleta, CA, and vicinity, 
Santa Barbara County ............ 
30B. Rillito River in the vicinity 
of Tucson, Gila River and 
tributaries, AZ ....................... 
30C. Santa Ana River mainstem, 
including Santiago Creek, Santa 
Ana River Basin, CA .................. 
Page 
33-8 
33-8 
33-8 
33-8 
33-9 
33-9 
33-9 
33-9 
33-9 
33-9 
33-9 
Tables 
Table 33-A Cost and financial 
statement .................... 33-10 
Table 33-B Authorizing 
legislation ................. .33-14 
Table 33-C Other authorized 
navigation projects ........... 33-19 
Table 33-D Other authorized 
beach erosion 
control projects ............. 33-20 
Table 33-E Other authorized flood 
control projects ............... 33-21 
Table 33-F Not applicable 
Table 33-G Deauthorized projects ........ 33-22 
Table 33-H .Reconnaissance and 
condition surveys ............. 33-23 
Table 33-I Inspection of completed 
flood control projects ......... 33-23 
Table 33-J Flood control work under 
special authorization ...... .. 33-24 
33-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
1. CHANNEL ISLANDS HARBOR, CA 
Location. On coast of southern California about a 
mile northwest of existing harbor of Port Hueneme, 65 
miles northwest of Los Angeles Harbor, and 345 miles 
south of San Francisco. (See Coast and Geodetic Survey 
Charts 5007 and 5202.) 
Existing project. For details, see page 33-2 of 
Annual Report for 1981. 
Local cooperation. Fully complied with. 
Terminal facilities. Two thousand and six hundred 
boat slips in 9 marinas, with restroom and shower 
facilities; dry storage area for 300 boats with 3-ton and 
1-ton hoist facilities; 2 marine construction and repair 
yards with 5-ton travel lift and 35-ton hoist to 70-ton 
boatway haulout capacities; a fuel dock facility; a sportfishing 
complex; 6 restaurants; 2 coffee shops; 800 
waterfront apartments-many with adjoining slips; 
300 motel units; 4 yacht club buildings; 3 public 
convenience docks; a 66-slip guest boat complex; a 
harbor administration building/harbor patrol office 
and dock complex; a marine emporium complex, housing 
a chandlery store, a sail loft, a delicatessen, a fishing 
tackel shop, yacht sales, an underwater repair service, 
and an adjacent dock complex; a 7-lane free access 
public launch ramp, with paved pay parking for cars 
and trailers; a boaters' convenience center; a commercial 
fishing pier and hoist; 2 large public parks; a fire 
station; and a U.S. Coast Guard station. Waterwayconnected 
and north of the harbor is Mandalay Bay, a 
private keys-type waterfront homes development with 
an area for about 500 homes and connected dockage for 
boats. Transition from harbor to Mandalay Bay is 
restricted by a 4-lane high-rise bridge with a clearance 
height of 29 feet at high tide. 
Operations during fiscal year. Initiated and completed 
maintenance dredging of sand trap and entrance 
channel in March 1987 at a cost of $2,933,597 regular 
funds and $734,818 Navy funds. In addition, a reconnaissance 
and condition survey was conducted at a cost 
of $15,174. 
2. LOS ANGELES AND LONG BEACH 
HARBORS, CA 
Location. On coast of southern California in San 
Pedro Bay about 25 miles south of City of Los Angeles, 
about 96 miles northwest of San Diego Harbor, and 
about 410 miles southeast of San Francisco Harbor. 
(See Coast and Geodetic Survey Chart 5147.) 
Previous projects. For details, see page 1977 of 
Annual Report for 1915 and page 1646 of Annual 
Report for 1938. 
Existing project. For details, see page 33-3 of Annual 
Report for 1984. 
Local cooperation. All items of local cooperation 
required under the terms of the previous authorizing 
acts have been fully complied with. See page 33-3 of 
Annual Report for 1981 for requirements under the 
terms of the 1976 Water Resources Development Act. 
Terminal facilities. In Los Angeles Harbor, 82,553 
feet of wharves, of which 75,729 feet are owned by the 
city and 6,824 feet are owned by private interests. In 
Long Beach Harbor, 58,985 feet of wharves, of which 
51,775 feet are owned by the city and 7,210 feet are 
owned by private interests. In Long Beach Harbor, 
Federal Government owns 19,700 feet of waterfront 
inside the Navy mole, exclusive of finger piers. 
Operations during fiscal year. Completed contract 
payment for channel and basin dredging (1976 modification 
of existing project) at a cost of $376,851 regular 
funds, $31,088 required contributed funds, and -$407,938 
other contributed funds. Completed contract payment 
for maintenance repair (phase 3) of San Pedro breakwater 
at a cost of -$109,599 regular funds. 
3. MARINA DEL REY, LOS ANGELES 
COUNTY, CA 
Location. On coast of southern California, Santa 
Monica Bay in Los Angeles County, 20 miles northwest 
of Los Angeles Harbor and 390 miles southeast of San 
Francisco Bay. (See Coast and Geodetic Survey Charts 
5101 and 5144.) 
Existing project. For details, see page 33-3 of Annual 
Report for 1981. 
Local cooperation. Fully complied with. 
Terminal facilities. About 6,039 boats are presently 
berthed in 20 operating anchorages, which afford 6,039 
berths. A Coast Guard station with a permanently 
assigned 82-foot cutter; a firefighting detachment with 
a fire boat, a reserve fire boat, a pumper, and a ladder 
truck; and a sheriffs harbor patrol with 5 patrol boats 
and 5 auxiliary vessels are on 24-hour duty. Two fuel 
docks, one on each side of the main channel, are 
operational. A 10-lane public launching ramp with 
parking for 233 cars and trailers; dry storage for 396 
trailer-borne boats; and several commercial hoists are 
in operation, as well as 2 haul-out yards, one containing 
a 100-ton and 60-ton marine travel lift. Three hotels, 2 
motels, a ship chandlery, a fisherman's village shopping 
and tourist center, 26 restaurants, several snack bars, 5 
coffee shops, and 8 yacht clubs called the Marina home 
port. About 5,886 apartments are almost fully occupied; 
and additional residential/transient facilities are being 
planned, including a total of 600 rooms in 2 high-rise 
hotels. The Marina has reached its design capacity for 
about 6,000 boats and dry storage for about 2,000 more. 
Condominium conversion of 600 mid-rise apartment 
units is under way. 
Operations during fiscal year. Awarded contract 
for, initiated, and completed maintenance dredging in 
April 1987 at a cost of $616,615 regular funds and 
$75,109 other contributed funds. In addition, a reconnaissance 
and condition survey was conducted at a cost 
of $15,709. 
33-2

LOS ANGELES, CA, DISTRICT 
4. MORRO BAY HARBOR, CA 
Location. On coast of southern California 110 miles 
south of Monterey Bay, 120 miles northwest of Santa 
Barbara Harbor, and nearly midway between San 
Francisco and Los Angeles. (See Coast and Geodetic 
Survey Chart 5387.) 
Existing project. For details, see page 33-4 of Annual 
Report for 1980. 
Local cooperation. Fully complied with. None required 
under rehabilitation plan. 
Terminal facilities. Facilities, which are adequate 
for existing commerce, comprise 640 feet of existing 
piers constructed by Navy; 550 feet of piers and 150 feet 
of floating docks constructed by San Luis Obispo 
County; 263 feet of floating docks constructed by California 
Department of Parks and Recreation; 1,396 feet 
of floating docks constructed by City of Morro Bay; 
1,398 feet of privately owned piers; and 5,435 feet of 
privately owned floating docks. 
Operations during fiscal year. Awarded contract 
for, initiated, and completed maintenance dredging in 
June 1987 at a cost of $2,093,599 regular funds. In 
addition, a reconnaissance and condition survey was 
conducted at a cost of $17,152. 
5. OCEANSIDE HARBOR, CA 
Location. On coast of southern California at Oceanside, 
about 30 miles north of City of San Diego. (See 
Coast and Geodetic Survey Chart 5101.) 
Existing project. For details, see page 33-4 of Annual 
Report for 1981. 
Local cooperation. Fully complied with for maintenance 
to date. 
Terminal facilities. Berthing for 957 boats (783 
single-tie slips, 38 double-tie slips, and 136 side-ties, of 
which 54 are visitors slips); 12 dry storage spaces at 
Oceanside Marine Center; a fuel dock; a boat hoist; a 
launching ramp, which can accommodate 4 launchings 
at the same time; parking for 1,732 cars, with temporary 
parking for about 141 boat trailers; a boat-repair 
facility; a pump-out facility; a Coast Guard cutter; 
restaurants; retail stores; yacht brokers; a boatel/motel; 
condominiums; and a sport-fishing facility. 
Operations during fiscal year. Completed maintenance 
dredging in November 1986 at a cost of -$9,031 
regular funds and $209,983 Navy funds. Continued 
construction of second contract for experimental sand 
bypass system, pump facilities and power system, 
which is about 94 percent complete. Cost for construction 
was $1,539,908 regular funds. In addition, a reconnaissance 
and condition survey was conducted at a cost 
of $3,915. 
6. PORT HUENEME, CA 
Location. On coast of southern California about 65 
miles northwest of Los Angeles and Long Beach 
Harbors, about 1 mile southeast of Channel Islands 
Harbor, immediately west of the City of Port Hueneme, 
4 miles southwest of the City of Oxnard, and 10 miles 
southeast of the City of Ventura. 
Existing project. Adoption, maintenance, and expansion 
of existing harbor for deep-draft vessels at Port 
Hueneme, constructed by local interests and subsequently 
acquired by the U.S. Navy. Harbor as modernized 
and expanded consists of a west jetty about 800 
feet long; an east jetty about 1,000 feet long; an approach 
channel about 800 feet long, 600 feet wide, and 40 feet 
deep; an entrance channel about 1,550 feet long, 330 feet 
wide, and 36 feet deep; a central basin 1,080 feet long, 
1,025 feet wide, and 35 feet deep; and a channel (channel 
A) 2,830 feet long, 275 feet wide, and 35 feet deep. Plane 
of reference is mean lower low water. Range between 
mean lower low water and mean higher high water is 
5.4 feet. Extreme range is about 10 feet. 
Local cooperation. Requirements are described in 
full on page 33-3 of Annual Report for 1976. 
Terminal facilities. Oxnard Harbor District owns 
and operates terminal facilities known as the Port of 
Hueneme. Two commercial deep-water concrete 
wharves provide berthing space for vessels of 35-foot 
draft at mean lower low water; and 400 feet of medium 
draft berthing is available, as well as fishing vessel 
berthing. Ancillary facilities include extensive paved 
open storage areas; two clear span transit sheds and a 
warehouse provide 125,000 square feet of covered 
storage area, with ample rail and truck loading 
capability; and an administration building. Construction 
is under way to expand deep draft facilities to 5 berths. 
Plans also include expanding transit shed capacity by 
60,000 to 80,000 square feet, with additional truck 
loading capacity. Expansion is scheduled for completion 
in mid-1988. 
Operations during fiscal year. Awarded contract 
for, initiated, and completed harbor expansion in July 
1987 at a cost of $374,443 regular funds and $720,543 
other contributed funds. In addition, a reconnassiance 
and condition survey was conducted at a cost of $14,538. 
7. SAN DIEGO HARBOR, CA 
Location. On coast of southern California just north 
of United States-Mexico boundary line, about 109 miles 
southeast of Los Angeles and Long Beach Harbors. (See 
Coast and Geodetic Survey Chart 5107.) 
Previous projects. For details, see page 1976 of 
Annual Report for 1915 and page 1642 of Annual 
Report'for 1938. 
Existing project. For details, see page 33-4 of Annual 
Report for 1980. 
Local cooperation. Requirements are described in 
full on Page 33-5 of Annual Report for 1980. 
Terminal facilities. Consist of 45,070 feet of wharves, 
exclusive of Government-owned wharves, of which 
21,070 feet are Port District owned and 24,000 feet are 
33-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
privately owned. Government-owned wharves at North 
Island are restricted to military use only. 
Operations during fiscal year. Initiated and completed 
maintenance dredging in April 1987 at a cost of 
$947,236 regular funds. 
8. SAN DIEGO RIVER AND MISSION 
BAY, CA 
Location. The San Diego River has its source on the 
tableland in the Cuyamaca Mountains near Santa 
Ysabel, CA, and flows southwestward 52 miles to the 
Pacific Ocean at the City of San Diego. Mission Bay 
Harbor is adjacent to the outlet of the San Diego River, 
77 miles southeast of Los Angeles and Long Beach 
Harbors and 8 miles north of San Diego Harbor. 
Existing project. A leveed flood channel 800 feet 
wide, with a capacity of 115,000 cubic feet per second, 
from 0.4 mile above Morena Boulevard, 3.3 miles 
directly to the ocean; an altered railroad bridge over the 
leveed river flood channel; an entrance channel about 
5,200 feet long, 670 feet wide, and 20 to 25 feet deep into 
Mission Bay; in the bay, a main channel and turning 
basin about 2,700 feet long, 1,000 feet wide, and 20 feet 
deep, and two anchorage basins, one about 3,200 feet 
long, 600 feet wide, and 15 feet deep, and the other about 
1,600 feet long, ranging from 800 to 1,800 feet wide, and 
20 feet deep; three jetties at the entrance; and stone 
revetment for the banks of the entrance and main 
channels and turning basin. Plane of reference is mean 
lower low water. Range between mean lower low water 
and mean higher high water is 4.4 feet. Extreme range 
is about 10 feet. Latest approved estimated (1986) first 
cost is $37,700,000 ($20,200,000 Federal and $17,500,000 
non-Federal). This project modified the flood control 
project: "San Diego River Basin, California." (See H. 
Doc. 635, 77th Cong., 2d sess.) 
Local cooperation. Fully complied with. 
Terminal facilities. None, with the exception of 
mooring facilities for recreational craft and commercial 
sport-fishing boats only. 
Operations during fiscal year. Continued preparation 
of supplemental project plan, which is about 98 
percent complete. Continued preparation of environmental 
assessment, which is about 98 percent complete. 
Awarded contract for, initiated, and completed maintenance 
repair of north jetty in September 1987 at a cost 
of $293,339 regular funds. 
9. SANTA BARBARA HARBOR, CA 
Location. On coast of southern California 90 miles 
northwest of Los Angeles Harbor and 320 miles southeast 
of San Francisco Harbor. (See Coast and Geodetic 
Survey Chart 5261.) 
Existing project. For details, see page 33-4 of Annual 
Report for 1983. 
Local cooperation. See page 1015 of Annual Report 
for 1969 for items of local cooperation under 1962 
authorized modification of existing project. 
Terminal facilities. A wharf 2,000 feet long; a pier 
325 feet long in harbor for tie-up mooring for Coast 
Guard cutter; landing float; an open mooring and slip 
anchorage for small craft; and a launching ramp for 
small craft. 
Operations during fiscal year. Awarded contract 
for and initiated maintenance dredging, which is about 
35 percent complete, in December 1986 at a cost of 
$699,999 regular funds. 
10. VENTURA MARINA (VENTURA 
HARBOR), CA 
Location. On coast of southern California about 65 
miles northwest of the City of Los Angeles, about 70 
miles northwest of Los Angeles and Long Beach 
Harbors, and about 6 miles northwest of Channel 
Islands Harbor. 
Existing project. For details, see page 33-5 of Annual 
Report for 1981. 
Local cooperation. Fully complied with. 
Terminal facilities. Two fuel docks; guest berthing 
docks; 3 boat-repair facilities, 1 full service with a 60- 
ton travelift, 1 full service with a 150-ton marine 
elevator, and 1 do-it-yourself boatyard with a 20-ton 
travelift Fisherman's Pier, with 350-ton jib cranes for 
off-loading commercial fishing vessels; flake ice manufacturing 
and distribution system; 3 wholesale fish 
buying stations; a retail fish market and seafood 
restaurant; 1,800 boat slips; a mast up dry storage area 
for 112 trailerable boats; a 6-lane deluxe launch ramp; 2 
yacht clubs; restaurants; cocktail lounges; sport-fishing 
facilities; harbor and offshore islands excursion boats; 3 
yacht sales; marine communications sales and services; 
3 marine chandleries; 2 public restroom buildings; a 
harbor administration building/harbor master's office; 
a headquarters/visitors center for Channel Islands 
National Park; marine related ancillary businesses, 
including a convenience grocery store, a marine bookstore, 
a dive shop, gift shops, and a jewelry store; and a 
230-room resort and time-share hotel. 
Operations during fiscal year. Initiated and completed 
maintenance dredging of entrance channel and 
sand trap, and repair of detached breakwater in April 
1987. Cost for maintenance dredging was $902,245 
regular funds; and for breakwater repair, $386,499 
regular funds. 
11. RECONNAISSANCE AND 
CONDITION SURVEYS 
See table 33-H. 
Flood Control 
12. ALAMO LAKE, BILL WILLIAMS 
RIVER, AZ 
Location. About 70 miles southeast of Kingman, AZ, 
in a narrow gorge at river mile 39 on Bill Williams 
River, AZ, a tributary of Colorado River. 
33-4

LOS ANGELES, CA, DISTRICT 
Existing project. For details, see page 33-7 of Annual 
Report for 1981. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Maintained dam in 
good operating condition and administered real estate. 
13. CUCAMONGA CREEK, SANTA 
ANA RIVER BASIN, CA 
Location. In and near the Cities of Upland, Rancho 
Cucamonga, and Ontario, and the communities of Alta 
Loma and San Antonio Heights, San Bernardino and 
Riverside Counties, CA. 
Existing project. A debris basin on Cucamonga 
Creek and a concrete channel along Cucamonga Creek 
from the debris basin to Prado Dam; an improved San 
Antonio Heights diversion system that includes 6 debris 
basins and a concrete diversion channel that diverts 
West Cucamonga Creek headwaters into Cucamonga 
Creek; a collection levee and a debris basin downstream 
from Demens, Thorpe, and Angalls Canyons and a 
concrete outlet channel from the debris basin to 
Cucamonga Creek; a debris basin in Deer Canyon and a 
channel along Deer Creek from the debris basin to 
Cucamonga Creek; the Hillside debris basin in a canyon 
just west of Deer Canyon with an outlet channel to Deer 
Creek channel; an improved existing levee system along 
the west bank of Day Creek that assures flows from Day 
Canyon do not enter Deer Creek channel; turnouts that 
mitigate ground water basin recharge losses; landscaping 
appropriate for esthetic treatment; and recreational 
facilities in the project area. Subdrainage is 
provided along specific reaches of the channels. Map of 
modified plan is in "Design Memorandum No. 2, General 
Design for Flood Control and Recreation, Cucamonga 
Creek, Santa Ana River Basin, San Bernardino and 
Riverside Counties, California," prepared by Los Angeles 
District in June 1973. 
Local cooperation. Requirements are described in 
full on page 33-7 of Annual Report for 1981. 
Operations during fiscal year. Completed construction 
of fourteenth contract, erosion control of 
Cucamonga and Deer Creeks, in February 1987. 
Completed construction of sixteenth contract, recreational 
facilities (part 2), in October 1986. Cost for 
construction of channels was $5,000 regular funds; and 
for recreational facilities, $17,409 regular funds and 
$15,934 required contributed funds. 
14. GILA RIVER BASIN, AZ 
14A. PAINTED ROCK DAM (GILA 
RIVER), AZ 
Location. On Gila River (mile 126) about 20 miles 
downstream from Gila Bend, AZ, in Gila River Basin, 
which is a part of Colorado River Basin. 
Existing project. For details, see page 33-9 of Annual 
Report for 1981. 
Local cooperation. Requirements are described in 
full on page 33-9 of Annual Report for 1981. 
Operations during fiscal year. Maintained dam in 
good operating condition and administered real estate. 
14B. PHOENIX, AZ, AND VICINITY 
(INCLUDING NEW RIVER) 
Location. On Cave Creek, Skunk Creek, Dreamy 
Draw, New River, and Agua Fria River in and adjacent 
to metropolitan Phoenix, AZ. 
Existing project. Plan as modified by Division 
Engineer, South Pacific Division, in July 1977, provides 
for four dams and detention basins, one each on Dreamy 
Draw, Cave Creek, Skunk Creek, and New River; 
Arizona Canal diversion channel; channel improvements 
on Cave Creek, Skunk Creek, and New River; flowage 
easements along Skunk Creek and New and Agua Fria 
Rivers; flood plain management along Dreamy Draw, 
Cave Creek, Skunk Creek, and New River; and recreational 
facilities. Approved estimated (1987) first cost 
for modified project is $421,712,000 (full funding 
estimate and includes allowance for estimated inflation 
through construction period), comprising $254,009,000 
Federal and $167,703,000 non-Federal. Map of modified 
plan is in "Design Memorandum No. 3, General Design 
Memorandum-Phase I, Plan Formulation for New 
River and Phoenix City Streams, Arizona," prepared 
by Los Angeles District in March 1976. 
Local cooperation. Requirements are described in 
full on page 33-9 of Annual Report for 1981. 
Operations during fiscal year. Completed construction 
of Arizona Canal diversion channel, reach 1, 
Skunk Creek to Cactus Road, in February 1987. 
Completed preparation of plans and specifications for 
Skunk Creek and New and Agua Fria Rivers. Awarded 
contracts for Skunk Creek bank stabilization and for 
Agua Fria River levees, both in September 1987. 
Awarded contract for and initiated construction of 
Arizona Canal diversion channel, reach 2A, Cactus 
Road to 47th Drive, which is about 97 percent complete. 
Awarded contract for, initiated, and completed construction 
of recreational facilities (phase 2) at Dreamy 
Draw Dam in July 1987. Completed preparation of 
plans and specifications for Arizona Canal diversion 
channel, reach 2B, 47th Drive to 29th Avenue; and 
awarded contract in September 1987. Completed 
preparation of plans and specifications for recreational 
facilities, Arizona Canal diversion channel, City of 
Glendale. Initiated preparation of plans and specifications 
,for -Gave Creek channel and sediment basin. 
Initiated preparation of plans and specifications for 
Arizona Canal diversion channel, reach 3, 29th Avenue 
to Dreamy Draw Dam. Administered rights-of-way 
acquisition continued by local interests. Costs for 
construction of channels were $4,616,075 regular funds, 
$121,320 required contributed funds, and $282,212 
other contributed funds. Costs for construction of dam 
were $52,112 regular funds and $1,227 required 
33-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
contributed funds; and for recreational facilities, 
$127,658 regular funds and $127,645 required contributed 
funds. 
14C. WHITLOW RANCH DAM, QUEEN 
CREEK, AZ 
Location. On Queen Creek, AZ, a tributary of Gila 
River, about 10 miles west of Superior, AZ. 
Existing project. For details, see page 33-10 of 
Annual Report for 1981. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Maintained dam in 
good operating condition; and administered real estate. 
15. LOS ANGELES COUNTY 
DRAINAGE AREA, CA 
Location. Along Los Angeles and San Gabriel Rivers, 
Rio Hondo, and Ballona Creek, and tributaries thereof 
in Los Angeles County, CA. 
Previous project. For details, see pages 1768 to 1772 
of Annual Report for 1941; page 1602 of Annual Report 
for 1942; and page 1535 of Annual Report for 1943. 
Existing project. Flood control improvements in 
four stream basins in Los Angeles County, CA, as 
follows: Los Angeles River Basin, San Gabriel River 
Basin, Rio Hondo Basin, and Ballona Creek Basin. 
Protection of about 325,000 acres in densely populated 
Los Angeles County, including areas in Los Angeles, 
Pasadena, Glendale, Burbank, and other cities. Five 
flood control dams (Hansen, Lopez, Santa Fe, Sepulveda, 
and Whittier Narrows); debris basins at mouths of 22 
canyons; channel improvements along 101.3 miles of 
Los Angeles River, San Gabriel River, Rio Hondo, and 
Ballona Creek; and channel improvements along 192.89 
miles of tributary channels. For details on units, see 
Annual Report for 1962. For other pertinent information, 
see table 33-G, "Deauthorized Projects." 
A rehabilitation plan was approved in May 1984. The 
rehabilitation plan provides for restoring deteriorated 
portions of the Los Angeles River channel along a 23.5- 
mile reach from Lankershim Boulevard to Stewart and 
Gray Road, and for repairing and improving the Los 
Angeles River channel along a 1-mile reach upstream 
from Sepulveda Dam in the vicinity of Balboa Boulevard. 
Latest approved estimated (1985) Federal first cost for 
rehabilitation is $29,700,000 (includes allowance for 
estimated inflation through construction period). A 
map of the rehabilitation plan is in "General Design 
Memorandum, Los Angeles River Rehabilitation under 
the Major Rehabilitation Program," dated January 
1984 and revised in March 1984. 
Local cooperation. Requirements are described in 
full on page 33-11 of Annual Report for 1981. 
Operations during fiscal year. Operations for units 
in Los Angeles River Basin: (a) Compton Creek: 
Maintained channel in good operating condition from 
Alameda Street to Hooper Avenue storm drain. (b) 
Haines Canyon: Maintained debris basin and channel 
upstream from Plainview Avenue in good operating 
condition and administered real estate. (c) Hansen 
Dam: Maintained dam in good operating condition and 
administered real estate. (d) Lopez Dam: Maintained 
dam in good operating condition and administered real 
estate. (e) Los Angeles River channel, Lankershim 
Boulevard to Stewart and Gray Road: Administered 
real estate. Completed construction of seventh rehabilitation 
contract, sideslope (Olympic Blvd. to Washington 
Blvd.) and main channel invert (4th St. to Washington 
Blvd.), in December 1986. Completed construction of 
eighth rehabilitation contract, subdrain flapgates (Dayton 
Ave. to Stewart and Gray Rd.), in December 1986. 
Awarded contract for and initiated construction of 
ninth rehabilitation contract, main channel invert 
overlay under 4 bridges (Golden State Fwy to Fletcher 
Dr.), which is about 98 percent complete. Initiated and 
completed construction of tenth rehabilitation contract, 
main channel invert overlay (Dayton Ave. to Atlantic 
Blvd.), in January 1987. Completed preparation of 
plans and specifications for eleventh rehabilitation 
contract, main channel invert overlay (Niagara St. to 
Burbank-Western channel confluence). Completed preparation 
of plans and specifications for twelfth rehabilitation 
contract, main channel invert overlay (Dayton 
Ave. to Soto St.); and awarded contract in September 
1987. Cost for construction of channels was $4,191,941 
regular funds. (f) Los Angeles River channel, Santa 
Ana Branch, Pacific Electric railway bridge to Pacific 
Ocean: Completed construction of phase 2A construction 
of recreational facilities in November 1986 at a cost of 
$41,353 regular funds, $107,413 required contributed 
funds, and $116,365 other contributed funds. (g) Sepulveda 
Dam: Continued preparation of water control 
manual. Maintained dam in good operating condition 
and administered real estate. 
Operations for units in San Gabriel River Basin: (a) 
Santa Fe Dam: Maintained dam in good operating 
condition and administered real estate. Initiated preparation 
of revised master plan. (b) San Gabriel River 
channel, San Gabriel Canyon to Santa Fe Dam, 
Approach channel to Santa Fe Dam (remedial work): 
Maintained channel in good operating condition. (c) 
Whittier Narrows Dam: Maintained dam in good 
operating condition and administered real estate. 
Operations for units in Rio Hondo Basin: (a) Alhambra 
Wash: Maintained channel upstream from Valley 
Boulevard in good operating condition. (b) Rio Hondo 
channel, Whittier Narrows Dam to Los Angeles River 
(lower): Completed construction of phase 2A construction 
of recreational facilities in November 1986 at 
a cost of $41,353 regular funds, $107,413 required 
contributed funds, and $116,365 other contributed funds. 
Operations for unit in Ballona Creek Basin: Ballona 
Creek channel and jetties: Maintained channel downstream 
from Washington Boulevard to La Salle Avenue 
and downstream from Los Angeles city boundary to 
ocean; jetties; and Pacific Avenue bridge in good 
operating condition. 
33-6

LOS ANGELES, CA, DISTRICT 
16. LOS COCHES CREEK, SAN DIEGO 
COUNTY, CA 
Location. In the community of Lakeside, San Diego 
County, CA. 
Existing project. Plan provides for a 1.8-mile-long 
rectangular concrete channel; an inlet structure just 
downstream from the Los Coches Creek bridge and 
adjacent to Los Coches and Ha-Hana Roads; and an 
outlet structure at the confluence of the San Diego 
River. Plan also provides for 5 double box culverts and 1 
triple box culvert. Latest approved estimated (1983) 
first cost for project is $6,197,000 ($4,000,000 Federal 
and $2,197,000 non-Federal). 
Local cooperation. Requirements are described in 
full on page 33-8 of Annual Report for 1985. 
Operations during fiscal year. Completed first 
construction contract in February 1987; and initiated 
phase I mitigation contract, which is about 98 percent 
complete, at a cost of $1,237,736 regular funds and 
$2,185,239 required contributed funds. Initiated preparation 
of plans and specifications for phase II mitigation 
measures. 
17. LYTLE AND WARM CREEKS, 
SANTA ANA RIVER BASIN, CA 
Location. Near San Bernardino and Colton, San 
Bernardino County, CA. 
Existing project. A rectangular concrete channel 
extending for 3.5 miles along East Branch of Lytle 
Creek from existing Foothill Boulevard inlet structure 
to confluence with Warm Creek; a concrete trapezoidal 
channel on Warm Creek for 1.5 miles from confluence 
with East Branch of Lytle Creek to confluence with 
Santa Ana River; a leveed channel extending about 1.8 
miles along Santa Ana River from mouth of existing 
East Twin and Warm Creeks concrete channel to 
Mount Vernon Avenue crossing; 4 replaced railroad 
bridges and 12 replaced highway bridges; 3 new 
highway bridges; inlets for side drainage; and relocated 
and protected utilities. Design capacities of improvements 
are: East Branch of Lytle Creek, 58,000 cubic 
feet per second; Warm Creek, 60,000 to 90,000 cubic feet 
per second; and Santa Ana River, 167,000 to 234,000 
cubic feet per second. Authorized project was modified 
by Design Memorandum No. 1, approved in May 1972, 
which contains a map of modified project plan. Supplement 
to Design Memorandum No. 1 was approved in 
August 1985. 
Local cooperation. Requirements are described in 
full on page 33-13 of Annual Report for 1981. 
Operations during fiscal year. Completed constructed 
to partly correct project deficiency in May 
1987 at a cost of $1,399,364 regular funds. 
18. MOJAVE RIVER DAM, MOJAVE 
RIVER BASIN, CA 
Location. On Mojave River at the Forks site, just 
downstream from mouth of Deep Creek and about 14 
miles upstream from Victorville, in Mojave River 
Basin, CA. 
Existing project. For details, see page 33-8 of Annual 
Report for 1983. 
Local cooperation. Requirements are described in 
full on page 33-13 of Annual Report for 1981. 
Operations during fiscal year. Maintained dam in 
good operating condition and administered real estate. 
19. PINE AND MATHEWS CANYONS 
DAMS, COLORADO RIVER BASIN, 
NV 
Location. In Lincoln County, NV, about 100 miles 
north of Hoover Dam and about 17 and 20 miles, 
respectively, east of Caliente, NV. 
Existing project. For details, see page 33-13 of 
Annual Report for 1981. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Maintained dams in 
good operating condition and administered real estate. 
20. SAN LUIS REY RIVER, SAN LUIS 
REY RIVER BASIN, CA 
Location. Lower San Luis Rey River Valley along 
San Luis Rey River from Murray Road (river mile 7.2) 
to Pacific Ocean, San Diego County, CA. 
Existing project. Plan provides for about 5.7 miles of 
earth-bottom trapezoidal channel along San Luis Rey 
River from Murray Road to about 1 mile upstream from 
U.S. Highway No. 101; about 1.5 miles of channel 
grading, which would generally be limited to the 
removal of spoil banks, from about 1 mile upstream 
from U.S. Highway No. 101 to ocean; and about 800 feet 
of stone-revetted levee on the left (south) bank from the 
Atcheson, Topeka and Santa Fe railroad to ocean. Plan 
also provides for beautification features. Latest approved 
estimated (1986) first cost for project is $45,400,000 
($33,900,000 Federal and $11,500,000 non-Federal). 
Local cooperation. Provide lands, easements, and 
rights-of-way; perform necessary construction, modification, 
or relocation of highways (including bridges), 
utilities, and irrigation and drainage facilities; maintain 
and operate works after completion; hold and save the 
United States free from damages; adjust water-rights 
claims resulting from project; prevent any obstruction 
or encroachment that would reduce flood-carrying 
capacities of improved channel; and provide guidance 
and leardership in preventing unwise future development 
of flood plain. Under terms of Water Resources 
Development Act of 1986, contribute minimum project 
33-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
cost share of 25 percent and maximum project cost 
share of 50 percent, including a minimum of 5 percent 
cash during construction. 
Operations during fiscal year. Initiated preparation 
of supplemental project plan, phase II, which is about 
60 percent complete. 
21. SANTA ANA RIVER BASIN (AND 
ORANGE COUNTY), CA 
Location. On Santa Ana River and tributaries and on 
other streams in Orange, Riverside, and San Bernardino 
Counties, CA. 
General plan of improvement. For details, see page 
33-14 of Annual Report for 1981. 
Existing project. For details on units, see Annual 
Report for 1968. For other pertinent information, see 
table 33-G, "Deauthorized Projects." 
Local cooperation. Fully complied with. 
Operations during fiscal year. (a) Brea Dam: 
Initiated preparation of revised master plan. Continued 
preparation of water control manual. Maintained dam 
in good operating condition and administered real 
estate. (b) Carbon Canyon Dam and channel: Maintained 
project in good operating condition and administered 
real estate. (c) Fullerton Dam: Continued preparation 
of water control manual. Maintained dam in good 
operating condition and administered real estate. (d) 
Prado Dam: Maintained dam in good operating condition 
and administered real estate. Initiated preparation of 
water control manual. (e) San Antonio Dam: Maintained 
dam in good operating condition and administered real 
estate. (f) San Antonio and Chino Creeks channel: 
Maintained project in good operating condition and 
administered real estate. 
22. SWEET WATER RIVER 
SWEET WATER RIVER BASIN, CA 
Location. Lower Sweetwater River Valley, along 
Sweetwater River from Interstate Freeway 805 to San 
Diego Bay, San Diego County, CA. 
Existing Project. Plan as modified provides for 
about 3.2 miles of improved trapezoidal channel along 
Sweetwater River from Interstate Freeway 805 to San 
Diego Bay as part of a combined flood control and 
highway project. Latest approved estimated (1986) first 
cost for project is $49,000,000 (includes allowance for 
estimated inflation through construction period), comprising 
$25,200,000 Federal and $23,800,000 non- 
Federal. Map of modified plan is in "General Design 
Memorandum No. Ifor Sweetwater River Flood Control 
Channel, San Diego County, California," prepared bS' 
Los Angeles District in March 1982 and revised in May 
1984. 
Local cooperation. Requirements are described in 
full on page 33-16 of Annual Report for 1981. 
Operations during fiscal year. Contract payment 
for construction of channels at a cost of $2,930,878 
regular funds; and for relocations, $1,039,061 regular 
funds. Construction was terminated as a result of a 
court injunction issued in April 1987 because of 
environmental mitigation problems. 
23. WEST MAGNESIA CANYON 
CHANNEL, RANCHO MIRAGE, CA 
Location. In the City of Rancho Mirage, Riverside 
County, CA. 
Existing project. Plan provides for a debris basin at 
mouth of Magnesia Spring Canyon; a 1.4-mile-long 
rectangular concrete channel; and an energy dissipator 
at the confluence of the Whitewater River. Plan also 
provides for preservation and enhancement of wildlife 
habitat values on 20 acres of alluvial cone. Latest 
approved estimated (1983) first cost for project is 
$8,279,000 ($4,000,000 Federal and $4,279,000 non- 
Federal). 
Local cooperation. Requirements are described in 
full on page 33-10 of Annual Report for 1985. 
Operations during fiscal year. Completed first 
construction contract in November 1986; and initiated 
mitigation contract, which is about 98 percent complete. 
Cost for construction of channel was $130,393 required 
contributed funds; and for bridge alteration, $166,322 
required contributed funds. 
24. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Inspection costs for fiscal year from regular funds for 
maintenance were $279,747. (See table 33-I on inspection 
of completed flood control projects.) 
25. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
In accordance with section 7, Flood Control Act of 
1944, studies of reservoir operations for flood control 
were conducted; and preparation of regulations for the 
use of storage allocated for flood control was continued 
for the following Bureau of Reclamation projects: 
Hoover Dam and Twitchell Dam. Costs for fiscal year 
from regular funds for maintenance were $56,775. 
26. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, 
Public Law 80-858, as amended (preauthorization) 
See table 33-J on flood control work under special 
authorization. 
Emergency bank protection (sec. 14 of 1946 Flood 
Control Act, Public Law 526, 79th Cong.) 
Federal cost for fiscal year was $1,213 for Rillito 
River, Pima County, AZ; $905 for Nazlini Wash, Chinle, 
Apache County, AZ; $3,136 for Gila River, Pima Bridge, 
Safford, Graham County, AZ; $1,567 for Santa Ana 
River, Colton, San Bernardino County, CA; $21,000 for 
33-8

LOS ANGELES, CA, DISTRICT 
Arroyo Conejo Creek, Camarillo, Ventura County, CA; 
and $1,822 for Chino Canyon, Palm Springs, Riverside 
County, CA. 
Emergency flood control activities- repair, flood 
fighting, and rescue work (Public Law 99, 84th 
Cong., and antecedent legislation) 
Federal cost for fiscal year was $238,872, all of which 
was for advance preparation. 
Flood insurance activities (sections 1301-1377, 
1968 Housing and Urban Development Act, Public 
Law 90-448, as amended) 
In coordination with flood control activities, flood 
insurance studies were continued in accordance with 
Inter-Agency Agreements at fiscal year cost of $6,568 
under Housing and Urban Development reimbursable 
order. 
General Investigations 
27. SURVEYS 
Fiscal year cost was $5,278,164 regular funds, of 
which $898,574 were for navigation studies; $36,746 
were for beach erosion control studies; $2,883,145 were 
for flood control studies; $1,046,893 were for surveys; 
$82,189 were for special studies involving coordination 
with other agencies; $215,345 were for review of 
authorized projects; and $115,272 were for miscellaneous 
activities. 
28. COLLECTION AND STUDY OF 
BASIC DATA 
Fiscal year costs were $184,157 for technical services; 
and $40,868 for flood plain management. 
29. RESEARCH AND DEVELOPMENT 
Fiscal year cost was $12,821 for hydrologic studies. 
30. PRECONSTRUCTION 
ENGINEERING AND 
DESIGN 
30A. GOLETA, CA, AND VICINITY, 
SANTA BARBARA COUNTY 
Goleta, CA, and vicinity is in Goleta Valley along 
Atascadero Creek and its tributaries, including Tecolotito, 
Carneros, San Pedro, Las Vegas, San Jose, and 
Maria Ygnacio Creeks, from the Santa Ynez Mountains 
in Santa Barbara County to Pacific Ocean near Goleta, 
CA. Project was authorized by Flood Control Act of 
1970, -ublic Law 91-611, dated December 31, 1970. 
Plan of improvement provides for about 12.5 miles of 
channel improvement, comprising abodit 1.3 miles of 
channel clearing and about 11.2 miles of channel 
construction. Channel clearing would be required on 
Maria Ygnacio, San Jose, Las Vegas, San Pedro, and 
Carneros Creeks. Channel construction would include 
the improvement of Atascadero Creek from San Marcos 
Road to ocean; Maria Ygnacio Creek from Hollister 
Avenue to Atascadero Creek; San Jose Creek from 0.2 
mile north of U.S. Highway No. 101 to San Pedro Creek; 
Las Vegas Creek from Cathedral Oaks Road to San 
Pedro Creek; San Pedro Creek from a point 0.1 mile 
downstream from Stow Canyon Road to Atascadero 
Creek; Carneros Creek from 0.6 mile upstream from 
U.S. Highway No. 101, by means of a diversion route, to 
Tecolotito Creek; and Tecolotito Creek from U.S. 
Highway No. 101 to Atascadero Creek. Plan also 
provides for beautification and recreation features. 
Continued preparation of project plan, phase I, during 
fiscal year. Estimated preconstruction planning cost is 
$2,650,000. Total costs during fiscal year were $16,419. 
30B. RILLITO RIVER IN THE VICINITY 
OF TUCSON, GILA RIVER AND 
TRIBUTARIES, AZ 
Rillito River and associated streams are in the north 
and east parts of the Tucson metropolitan area, Pima 
County, AZ. Project was authorized by Water Resources 
Development Act of 1986, Public Law 99-662, dated 
November 17, 1986. 
Plan of improvement provides for bank erosion control 
and grade control structures to prevent degradation; 
landscaping; and recreational features. 
Initiated preparation of project plan during fiscal 
year. Estimated preconstruction planning cost is 
$830,000. Total costs during fiscal year were $69,787. 
30C. SANTA ANA RIVER MAINSTEM, 
INCLUDING SANTIAGO CREEK, 
SANTA ANA RIVER BASIN, CA 
Santa Ana River mainstem, including Santiago Creek, 
Santa Ana River Basin, CA, is on Santa Ana River and 
tributaries and on other streams in Orange, Riverside, 
and San Bernardino Counties, CA. Project was authorized 
by Water Resources Development Act of 1986, 
Public Law 99-662, dated November 17, 1986. 
Plan of improvement provides for construction of 
Seven Oaks Dam in the San Bernardino Mountains 
north of Redlands, San Bernardino County; management 
of flood plain between Seven Oaks Dam and Prado 
Reservoir; raising Mill Creek levee near Redlands; 
improvement of Oak Street Drain in Corona, Riverside 
County; enlargement of existing Prado Dam and 
reservoir, Riverside and San Bernardino Counties; 
improvement of lower Santa Ana River channel from 
Prado Dam to Pacific Ocean; and improvement of lower 
reach of Santiago Creek channel in Orange County; 
recreational development along project length; purchase 
of 8 acres of salt marsh for mitigation of project effects; 
and purchase of 84 acres of wetlands at mouth of Santa 
Ana River for preservation of endangered least tern 
habitat. 
Continued preparation of project plan, phase II, 
during fiscal year. Estimated preconstruction planning 
cost is $27,300,000. Total costs during fiscal year were 
$7,531,750. 
33-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 33-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
1. Channel Islands 
Harbor, CA 
2. Los Angeles and 
Long Beach 
Harbors, CA 
(Regular Funds) 
(Required Contrib. 
Funds) 
(Other Contrib. 
Funds) 
3. Marina del Rey, 
Los Angeles 
County, CA 
(Regular Funds) 
Required Contrib. 
Funds) 
(Other Contrib. 
Funds) 
4. Morro Bay Harbor, 
CA 
5. Oceanside Harbor, 
CA (Regular 
Funds) 
(Other Contrib. 
Funds) 
6. Port Hueneme, 
CA (Regular 
Funds) 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
Maint.: 
Contrib. 
Cost 
New Work: 
Contrib. 
Cost 
Maint.: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
Maint.: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint. : 
Approp. 
Cost 
-$164,000 
2,157,690 
-$340,000 
-268,794 
704,000 
3,062,364 
3,513,800 
3,513,156 
-$69,000 
17,627 
1,102,904 
1,065,667 
80,057 
515,690 
165,000 
1,676,263 
3,021,874 
2,920,156 
-1,970,133 1,162,500 
2,411,303 1,001,590 
200,000 
28,704 
-305,657 
1,110,676 
122,601 
11,000 
10,625 
- - $5,123,3451 
- - 5,123,3451 
261,415 3,203,174 24,693,8952 
273,870 3,198,140 24,682,4292 
- - 64,710,719s 
18,467 391,771 64,709,402$ 
1,821,249 1,566,000 13,336,212' 
1,889,994 1,481,763 13,224,378' 
- - 1,203,180 
- 31,088 1,200,514 
- - 37,961,705 b 
- -406,047 37,104,2346 
- - 4,238,7526 
- - 4,238,752 
61,871 969,709 2,354,6177 
59,576 840,434 2,223,047 
- - 4,238,752 
- - 4,238,752 
- - 120,840 
- - 114,000 
- - 1,843,146 
- - 1,843,146 
- 175,000 175,000 
- 75,109 75,109 
- - 2,612,0938 
- - 2,612,0938 
149,093 2,392,152 12,207,0589 
251,252 2,331,215 12,195,256 9 
- - 2,128,411 
- - 2,128,411 
5,019,575 2,518,915 16,766,52910 
5,192,340 2,301,884 16,394,53510 
- - 491,286" 
- - 491,286" 
- - 1,200,000 
- - 1,187,500 
15,000 580,000 2,076,400 
65,934 483,161 1,979,561 
5,000 14,538 1,275,60612 
16,191 14,538 1,273,44212 
33-10

LOS ANGELES, CA, DISTRICT 
TABLE 33-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
Other Contrib. 
Funds) 
7. San Diego Harbor, 
CA (Regular 
Funds) 
(Required Contrib. 
unds) 
(Other Contrib. 
Funds) 
8. San Diego River 
and Mission 
Bay, CA 
9. Santa Barbara 
Harbor, CA 
10. Ventura Marina 
(Ventura Harbor), 
CA 
12. Alamo Lake, 
Bill Williams 
River, AZ 
13. Cucamonga Creek, 
Santa Ana River 
Basin, CA 
(Regular Funds) 
(Required Contrib. 
Funds) 
(Other Contrib. 
Funds) 
14A. Gila River Basin, 
AZ, Painted 
Rock Dam (Gila 
River) 
New Work: 
Contrib. 
Cost 
Maint.: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Contrib. 
Cog+ 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
- 810,475 
- 720,543 
119,610 
202,656 
662,437 
35,000 
58,373 
-107,000 
3,154,990 
13,127 112,300 1,24 
66,685 113,854 1,22 
69,000 
58,939 
-20,600 
14,774 
19,586 
44,475 
83,097 
33 
31 
868,563 
778,152 
119,610 
- 28,094,095s 
40 28,092,239 s 
8,243 3,641,00814 
4,701 3,611,22714 
- 717,910 
- 715,215 
- 1,926,56315 
- 1,900,06316 
- 11,974,09916 
190 11,972,42216 
4,000 5,125,34817 
9,850 5,109,50817 
--- - 172,00018 
- - - 172,00018 
341,000 328,000 720,700 787,000 10,095,81919 
729,914 324,420 686,790 823,733 10,094,29319 
- - - 1,711,53t- 
-.- - 1,711,53920 
653,000 1,635,000 1,823,920 1,659,500 17,411,85721 
818,882 1,635,618 1,836,388 1,644,746 17,393,90221 
- -525 
494,000 546,000 
580,299 579,462 
-56 
697,000 
684,264 
100,000 1,553,000 160,600 
1,041,150 2,686,070 370,430 
-39,526 
6,823 
472,000 
479,419 
458,000 57,000 
- 491,644 
64,521 -57,000 
47,380 27,728 
752,000 
751,204 
651,000 
616,553 
- 16,934,060 
581 16,934,060 
777,000 5,902,799 
741,897 5,828,089 
- 93,360,500 
45,747 93,311,017 
- 600,512 
15,934 579,842 
- 9,390,853 
49 9,332,327 
- 19,980,564 
- 19,980,56423 
805,000 8,990,148 
803,109 8,912,968 
33-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS AACCTTIIVVIITTIISE S FOR FY 1987 
TABLE 33-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
14B. Gila River Basin, 
AZ, Phoenix, 
AZ, and vicinity 
including New River) 
(Regular Funds) 
Required Contrib.) 
unds) 
(Other Contrib. 
Funds) 
14C. Gila River Basin, 
AZ, Whitlow 
Ranch Dam, 
Queen Creek 
15. Los Angeles County 
drainage area, 
CA (Regular Funds) 
(Required Contrib. 
Funds) 
(Other Contrib. 
Funds) 
16. Los Coches Creek, 
San Diego County, 
CA (Regular Funds) 
Required Contrib. 
Funds) 
17. Lytle and Warm 
Creeks, Santa Ana 
River Basin, CA 
18. Mojave River Dam, 
Mojave River 
Basin, CA 
(Regular Funds) 
(Other Contrib. 
Funds) 
19. Pine and Mathews 
Canyons Dams, 
Colorado River 
Basin, NV 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
Rehab.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
Maint.: 
Contrib. 
Cost 
New Work: 
Contrib. 
Cost 
Maint.: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint.: 
Approp. 
Cost 
12,860,000 5,600,000 16,539,000 34,500,000 
11,998,004 6,526,194 15,556,495 8,925,957 
500,000 
624,923 
143,000 
206,863 
-23,800 
858,698 
3,084,000 
6,864,570 
5,000,000 
1,800,240 
166,382 
31 
2 
621,000 
149,008 
1,775,000 
10,169 
135,000 
134,559 
207,361 
4,264,000 
3,474,626 
6,520,000 
9,475,162 
6,028 
516,000 
3, 
4, 
63 
08,007 200,000 
28,946 51,373 
- 245,000 2, 
10,054 240,846 1, 
- 100,000 4, 
- - 3, 
- 200,000 2 
-6,210 202,993 1 
342,000 275,000 
588,335 391,117 
119,394,297 
92,066,723 
333,500 745,000 3,413,714 
275,076 251,052 2,053,737 
- 1,730,000 3,964,700 
740,297 282,212 1,429,240 
- - 1,867,96324 
- - 1,867,96324 
42,000 58,000 1,001,413 
39,914 52,423 992,728 
- - 377,026,88525 26 
-1,199 4,647 377,023,328 27 
,444,000 3,649,400 59,273,42025 28 
,423,901 2,911,406 58,255,40328 29 
,869,000 11,121,000 29,510,000 
,929,743 4,566,377 19,771,282 
- - 13,933,3410 
659 366 13,891,23231 
- - 516,00032 
352,572 107,413 459,985" 
- - 36,644,86534 
-_ 36,639,8888 
161,186 - 669,19335 
241,091 116,365 637,775" 
,070,000 1,400,000 4,000,000 
,994,218 1,407,470 3,919,716 
,700,000 1,587,488 6,387,488 
,915,870 2,225,517 6,141,387 
,583,000 150,000 37,978,83137 
,150,453 1,538,906 37,908,42037 
- - 17,838,198 
- - 17,838,198 
116,000 134,000 3,278,548 
180,500 115,710 3,259,604 
- - 286,300 
- - 284,501 
S- 1,401,248 
- - 1,401,248 
240,000 143,000 105,000 107,000 1,211,356 
261,434 139,766 108,416 106,915 1,208,840 
33-12

LOS ANGELES, CA, DISTRICT 
TABLE 33-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
20. San Luis Rey New Work: 
River, San Luis Rey Approp. 75,000 - - 250,000 1,689,000 
River Basin, CA Cost - 73,974 301 223,717 1,661,992 
21. Santa Ana River New Work: 
Basin (and Orange Approp. 23,800 - - - 47,994,738 * 4o 
County), CA Cost 770,398 17,747 -436 2,211 47,994,738 ' 
(Regular Funds) Maint: 
Approp. 1,377,000 2,039,000 1,886,600 1,728,000 25,885,410 41 43 
Cost 1,775,951 2,202,404 1,982,194 1,670,993 25,746,496m '2 3 
Required Contrib. New Work: 
unds) Contrib. -17,394 - - -38,322 3,065,000" 
Cost -432 - 4,132 -38,322 3,065,000" 
Maint.: 
Contrib. - 75,000 - - 75,0000 
Cost - - 67,555 100 67,6553 
22. Sweetwater River, New Work: 
Sweetwater River Approp. 1,500,000 4,000,000 6,242,000 6,919,000 20,285,503 
Basin, CA Cost 467,244 4,964,685 6,295,436 4,164,487 17,507,766 
23. West Magnesia New Work: 
Canyon channel, Approp. 80,000 705,000 2,765,000 - 4,000,000 
Rancho Mirage, CA Cost 84,040 322,836 3,146,924 275 4,000,000 
(Regular Funds) 
Required Contrib. New Work: 
unds) Contrib. - 350,000 1,974,206 - 2,324,206 
Cost - 266,137 1,715,919 336,250 2,318,306 
1. Excludes $1,361,668 Navy funds; Coast Guard costs; 
and $210,748 other contributed funds. 
2. Includes $41,767 for reconnaissance and condition 
surveys. Excludes $5,624,131 for maintenance accomplished 
with Navy funds. 
3. Includes $2,187,047 for new work for previous project; 
$1,593,667 public works funds; a credit of $33,050 for transfer 
of land at Reservation Point; and $996,792 emergency relief 
funds. Excludes Federal funds spent by the Navy for new 
work on middle breakwater, and Coast Guard costs. 
4. Includes $139,347 for maintenance for previous project 
and $177,076 for reconnaissance and condition survey costs 
since FY 1958. 
5. Includes $1,672,575 for new work betterments desired 
by local interests prior to 1976 modification. Excludes $87,120 
for maintenance betterments desired by local interests prior 
to 1976 modification. 
6. Excludes Coast Guard costs. 
7. Includes $103,862 for reconnaissance and condition 
surveys. 
8. Navy funds. 
9. Includes $371,943 for reconnaissance and condition 
surveys since FY 1958 and $307,945 Navy funds. Excludes 
$124,578 other contributed funds. 
10. Includes $73,719 for reconnaissance and condition 
surveys. Excludes $5,380,249 for maintenance accomplished 
with Navy funds. 
11. For jetty and groin extensions desired by local 
interests. 
12. Includes $75,606 for reconnaissance and condition 
surveys. 
13. Includes $154 704 for new work for previous project; 
$86,352 public works funds; and $1,226,793 emergency relief 
funds. Excludes $254,795 Navy funds for dredging entrance 
channel in FY 1961 to depth of -42 feet mean lower low water 
(or 2 feet below project depth); and Coast Guard costs. 
14. Includes $59,904 for maintenance for previous project 
and $200,972 for reconnaissance and condition surveys since 
TF-i95.in addit ti includesi $144 for retroactive pay 
increase shown in "cost" figure only, as reported in 1958 
Annual Report, page 1430. Excludes $270,696 for maintenance 
accomplished with Navy funds. 
15. Includes $4,441 for betterments desired by local 
interests prior to modification by 1968 River and Harbor Act. 
16. Excludes $557,832 other contributed funds. Includes 
$2,610,000 regular funds and excludes $2,910,000 required 
contributed funds, both for new work on flood control project, 
"San Diego River Basin, California." 
17. Includes $103,116 for reconnaissance and condition 
surveys. 
18. Excludes Coast Guard costs. 
19. Includes $29,198 public works funds; $11,000 working 
funds for work performed in addition to existing project; and 
$19,741 for reconnaissance and condition surveys. Excludes 
$462,986 other contributed funds spent by the Corps for 
maintenance-dredging betterments desired by local interests. 
20. Excludes $1,708,836 required contributed funds and 
Coast Guard costs. 
21. Includes $89,819 for reconnaissance and condition 
surveys. Excludes $10,000 after contributed funds. 
22. Includes $57,000 Code 710 funds since FY 1975. 
23. Includes $357,469 Code 710 funds since FY 1962. 
24. Includes $3,758 Code 710 funds since FY 1962. 
25. Includes $11,008,935 emergency relief funds for new 
work. Excludes $16,726,888 emergency relief funds spent by 
Corps in connection with emergency relief (previous) project 
and $107,939 for minor rehabilitation. 
26. Includes $23,763,900 Code 710 funds since FY 1974 
($1,226,100 for Sepulveda Dam; $6,290,000 for Whittier 
Narrows Dam; $22,000 for LACDA prototype; $535,000 for 
Hansen Dam; $10,422,100 for Santa Fe Dam; $215,000 for 
Tujunga Wash channel; $8,500 for Lopez Dam; $3,562,200 for 
Los Angeles River and Rio Hondo channels; and $1,483,000 
for Ballona Creek channel). 
27. Includes $23,760,342 Code 710 funds since FY 1974 
($1,223,226 for Sepulveda Dam; $6,289.734 for Whittier 
33-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 33-A (Cont'd) COST AND FINANCIAL STATEMENT 
Narrows Dam; $22,000 for LACDA prototype; $535,000 for 
Hansen Dam; $10,421,682 for Santa Fe Dam; $215,000 for 
Tujunga Wash channel; $8,500 for Lopez Dam; $3,562,200 for 
Los Angeles River and Rio Hondo channels; and $1,483,000 
for Ballona Creek channel). 
28. Jncludes $2,013,400 for recreational facilities since 
FY 1985($1,518,400 for Sepulveda Dam and $495,000 for Los 
Angeles River and Rio Hondo channels). 
29. Includes $1,495,509 for recreational facilities since 
FY 1985 ($1,003,097 for Sepulveda Dam and $492,412 for Los 
Angeles River and Rio Hondo channels). 
30. Includes $13,933,341 Code 710 funds since FY 1974 
($992,650 for Sepulveda Dam; $6,797,556 for Whittier Narrows 
Dam; $199,541 for Tujunga Wash channel; $460,500 for 
Hansen Dam; $2,824,056 for Los Angeles River and Rio 
Hondo channels; $1,467,538 for Santa Fe Dam; and $1,191,500 
for Ballona Creek channel). 
31. Includes $13,891,232 Code 710 funds since FY 1974 
($992,650 for Sepulveda Dam; $6,755,767 for Whittier Narrows 
Darn; $199,541 for Tujunga Wash channel; $460,180 for 
Hansen Dam; $2,824,056 for Los Angeles River and Rio 
Hondo channels; $1,467,538 for Santa Fe Dam; and $1,191,500 
for Ballona Creek channel). 
32. Includes $516,000 for recreational facilities since FY 
1985 ($516,000 for Los Angeles River and Rio Hondo 
channels). 
33. Includes $459,985 for recreational facilities since FY 
1986 ($459,985 for Los Angeles River and Rio Hondo channels). 
34. Non-Federal funds spent by the Federal Government 
to September 30, 1987, for replacements required as part of 
local cooperation and betterments desired by local interests. 
Excludes $4,238,000 other contributed funds spent by the 
Corps in connection with emergency relief (previous) project. 
35. Includes $669,194 for recreational facilities since FY 
1984 ($299,194 for Santa Fe Dam and $370,000 for Los 
Angeles River and Rio Hondo channels). 
36. Includes $637,775 for recreational facilities since FY 
1984 ($299,194 for Santa Fe Dam and $338,581 for Los 
Angeles River and Rio Hondo channels). 
TABLE 33-B AUTHORIZING 
37. Excludes $5,499,193 other contributed funds. 
38. Comprises funds for Brea, Fullerton, Prado, and San 
Antonio Dams, Carbon Canyon Dam and channel, Lytle and 
Cajon Creeks channel improvements, and San Antonio and 
Chino Creeks channel. 
39. Includes $5,000 working funds for San Antonio Dam; 
$67,361 for San Juan Dam (deauthorized unit) (also reported 
under "Deauthorized Projects"); and $85,310 undistributed 
funds. Excludes other contributed funds spent by the Corps, 
as follows: $124,105 for water conservation betterments 
desired by local interests at Prado Dam; $8,500 for betterments 
desired by local interests at San Antonio Dam; $234,709 for 
betterments desired by local interests on San Antonio and 
Chino Creeks channel; and $601,762 for required items of 
local cooperation on Lytle and Cajon Creeks channel improvements. 
Excludes $290,000 spent direct by local interests on 
San Antonio and Chino Creeks channel for local cooperation 
items not required. 
40. Includes $5,920,831 Code 710 funds since FY 1974 
($1,058,731 for Carbon Canyon Dam and channel; $1,264,300 
or Fullerton Dam; and $3,597,800 for Prado Dam). 
41. Includes $114,000 for recreational facilities since FY 
1985 ($114,000 for Carbon Canyon Dam and channel). 
42. Includes $112,996 for recreational facilities since FY 
1985 ($112,996 for Carbon Canyon Dam and channel). 
43. Excludes maintenance for Lytle and Cajon Creeks 
channel improvements, which are operated and maintained 
by local interests. 
44. Includes $3,065,000 Code 710 funds since FY 1974 
($1,388,651 for Carbon Canyon Dam and channel; $1,250,349 
for Fullerton Dam; and $426,000 for Prado Dam). 
45. Includes $75,000 for recreational facilities since FY 
1985 ($75,000 for Carbon Canyon Dam and channel). 
46. Includes $67,655 for recreational facilities since FY 
1986 ($67,655 for Carbon Canyon Dam and channel). 
LEGISLATION 
See Date of 
Section in Authorizing 
Text Act Project and Work Authorized Documents 
1. Sep. 3, 1954 
2. June 3, 1896 
June 25, 1910 
July 25, 1912 
Aug. 8, 1917 
CHANNEL ISLANDS HARBOR, CA 
Harbor for light-draft vessels and shore protection 
works. 
LOS ANGELES AND LONG BEACH HARBORS, CA 
A breakwater 8,500 feet long, east of Point Fermin. 
Extend said breakwater to shore, making a total length 
of 11,152 feet from Point Fermin. 
Dredge Los Angeles outer harbor west of entrance 
channel. 
For silt-diversion works. 
H. Doc. 362, 83d Cong., 
2d sess. 
S. Doc. 18, 55th Cong., 
1st sess. 
H. Doc. 969, 60th Cong., 
1st sess. 
Rivers and Harbors 
Committee Doc. 8, 
62d Cong., 2d sess. 
Rivers and Harbors 
Committee Doc. 9, 
64th Cong., 2d sess. 
33-14 
- -- --

LOS ANGELES. CA, DISTRICT 
TABLE 33-B (Cont'd) AUTHORIZING LEGISLAI1ON 
See Date of 
Section in Authorizing 
Text Act Project and Work Authorized Documents 
Sep. 22, 1922 
Mar. 3, 1925 
July 3, 1930 
Do. 
Aug. 30, 1935 
Oct. 17, 1940 
Sep. 3, 1954 
July 14, 1960 
Oct. 22, 1976 
Triangular area approach to Los Angeles inner harbor H. Doc. 1013, 66th Cong., 
entrance channel. 3d sess. 
Dredge Los Angeles Harbor main channel and entrance H. Doc. 349, 68th 
35 feet deep and 1,000 feet wide; dredge inner harbor Cong., 1st sess. 
turning basin 35 feet deep; and reclamation of Reservation 
Point. 
A detached breakwater 12,500 feet long in prolongation Rivers and Harbors 
of existing breakwater (authorized by act of 1896). Committee Doc. 33, 
71st Cong., 2d sess. 
Widen fairway on east side of entrance to Los Angeles S. Doc. 130, 71st Cong., 
inner harbor; dredge a channel 35 feet deep and 650 2d sess. 
feet wide in East Basin from turning basin to U.S. 
station 406; dredge 35 feet deep and 400 feet wide 
in Cerritos channel from U.S. station 406 to Long 
Beach turning basin; a turning basin 35 feet deep 
at Long Beach; entrance channel to Long Beach Harbor 
35 feet deep and 500 feet wide; and maintenance 
of the Long Beach breakwater south of outer end pier 
A. This act provides that in no case shall dredging 
be done within 50 feet of established pierhead lines 
of existing piers and wharves. 
Dredge 1,000-foot-wide entrance channel to Los Angeles S. Committee print, 
outer harbor to 40-foot depth and a turning basin 3,500 74th Cong., 1st sess. 
feet long and 1,500 feet wide to same depth; and enlarge 
entrance to inner harbor by dredging to 35-foot depth a 
triangular area at its junction with turning basin. 
Dredge to a depth of 40 feet areas A and B adjacent to H. Doc. 843, 76th Cong., 
40-foot-depth entrance channel; construct and maintain a 3d sess. 
rubblemound breakwater of composite type 21,000 feet 
long in eastward direction from northeast end of existing 
detached breakwater; dredge about 4 million cubic yards 
initially for a settling basin at mouth of Los Angeles 
River diversion channel, and deposit material on beaches 
eastward therefrom to Belmont pier; maintenance dredging 
of areas A and B, and at mouth of Los Angeles River 
diversion channel; all subject to such modifications as 
in discretion of the Chief of Engineers may be advisable 
to meet requirements of the Navy. 
Dredge to a depth of 35 feet in East Basin as a modifi- H. Doc. 161, 83d Cong., 
cation of existing project. This act provides that the Secre- 1st sess. 
tary of the Army is authorized to reimburse local interests 
for work they have done upon this project prior to 
July 1, 1953, at actual cost to local interests so 
far as same shall be approved by Chief of Engineers and 
found to have been done in accordance with the project 
hereby adopted and that such reimbursement shall be 
subject to appropriations applicable thereto or funds 
available therefor and shall not take precedence over 
other pending projects of higher priority for harbor 
improvements; and that such payments shall not exceed 
$500,000. 
Dredge to a depth of 35 feet in West Basin as a H. Doc. 401, 86th Cong., 
modification of existing project. 2d sess. 
Dredge Los Angeles Harbor entrance channel 45 feet H. Doc 94-594, 94th 
deep, 1,000 feet wide, and about 5,500 feet long; Los Cong., 2d seas.i 
Angeles channel 45 feet deep, 750 feet wide, and about 
12,500 feet long; inner harbor turning basin 45 feet 
deep, 1,350 feet wide, and about 1,650 feet long; East 
Basin channel 45 feet deep, 400 feet wide, and about 6,000 
feet long;, West Basin 45 feet deep, from 350 to 1,350 feet 
wide, and about 3,800 feet long; and East Basin 45 feet 
deep, from 400 to 950 feet wide, and about 2,000 feet 
long. This act provides that no dredging shall be done 
within 125 feet of established pierhead lines, wharves, 
or other structures 
33-15 
_ _ - - , -. ~ _ _ __ _ ~ ~ ~ I _ ~ _ _ _ _ _ _ _ I _ __ I

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 33-B (Cont'd) AUTHORIZING LEGISLATION 
See Date of 
Section in Authorizing 
Text Act Project and Work Authorized Documents 
3. Sep. 3, 1954 
4. Mar. 2, 1945 
5. Oct. 27, 1965 
6. Aug. 13, 1968 
7. Mar. 3, 1875 
Sep. 19, 1890 
June 25, 1910 
Mar. 4, 1913 
July 27, 1916 
Aug. 8, 1917 
Aug. 8, 1917 
Sep. 22, 1922 
Mar. 3, 1925 
July 3, 1930 
Aug. 30, 1935 
Aug. 26, 1937 
Oct. 17, 1940 
Mar. 2, 1945 
Aug. 13, 1968 
MARINA DEL REY, LOS ANGELES COUNTY, CA 
Harbor for light-draft vessels. H. Doc, 389, 83d Cong., 
2d sess. 
MORRO BAY HARBOR, CA 
Adoption and improvement of existing entrance channel to H. Doc, 283, 77th Cong., 
bay, a breakwater extending south by west from Morro 1st sess. 
Rock, and bay channels and basins at locations and of 
dimensions substantially as shown on the Navy Department 
map on file in the Office of the Chief of Engineers. 
OCEANSIDE HARBOR, CA 
Maintenance of general navigation features of Del Mar H. Doc. 76, 89th Cong., 
Boat Basin and of Oceanside Harbor. 1st sess. 
PORT HUENEME, CA 
Adoption and maintenance of existing harbor for deep- H. Doc. 362, 90th Cong., 
draft vessels; dredged central basin to 35 feet deep; and 2d sess. 
widen, dredge to 35 feet deep, and extend southernmost 
interior channel. 
SAN DIEGO HARBOR, CA 
Diversion dike. Annual Report, 1873; 
p. 1142 
Jetty on Zuniga Shoal. H. Ex. Doc. 177, 50th 
Cong., 1st sess. (Annual 
Report, 1888; p. 2114) 
Dredge channel through outer bar 30 feet deep and 600 H. Doc. 961, 60th Cong., 
feet wide, and a channel through middle ground to 30 feet 1st sess. 
deep. 
Dredge channel through outer bar 570 feet wide and 35 H. Doc. 1309, 62d Cong., 
feet deep, and a channel through middle ground 32 feet 3d sess. 
deep. 
Widen approach (area B) to San Diego municipal pier by H. Doc. 648, 64th Cong., 
dredging area C (north of area B). 1st sess. 
Dredging area A (south of area B). Rivers and Harbors 
Committee Doc. 8, 64th 
Cong., 2d sess. 
Dredge 35-foot channel through middle ground. H. Doc. 140, 65th Cong., 
1st sess. 
Dredging areas D and E. H. Doc. 1000, 66th Cong., 
3d sess. 
Widen approach (area C) to San Diego municipal pier 1 River and Harbors 
by dredging a portion of area F (north of area C). Committe Doc. 2, 68th 
Cong., 1st sess. 
Deepen to 40 feet channel through outer bar; along south S. Doc. 81, 71st Cong., 
and north banks, main channel; dredge turning basin, 2d sess. 
widen area H, and dredge a channel to National City and 
Chula Vista. 
Widen bay channel to 2,200 feet with depth of 35 feet H. Doc. 223, 73d Cong., 
from the vicinity of Whalers Bight in lower bay to navel 2d sess. 
air station opposite turning basin. 
Dredging areas Q, Q-1, M, N, and 0. Rivers and Harbors 
Committe Doc. 89, 
74th Cong., 2d sess. 
Dredge a seaplane basin (area S) of about 3,000 acres, H. Doc. 844, 76th Cong., 
10 feet deep, and fill an area of about 110 acres adjacent 3d sess. 
to southern end of basin. 
Dredge triangular approaches to 26- and 35-foot H. Doc. 390, 77th Cong., 
anchorages, area M. 1st sess. 
Deepen and extend existing navigation channels, delete H. Doc. 365, 90th Cong., 
uncompleted parts, and extend maintenance. 2d sess. 
33-16

LOS ANGELES, CA, DISTRICT 
TABLE 33-B (Cont'd) 
Date of 
Authorizing 
Act 
AUTHORIZING LEGISLATION 
Project and Work Authorized 
8. July 24, 1946 
9. Aug. 30, 1935 
Mar. 2, 1945 
Oct. 23, 1962 
Dec. 31, 1970 
10. Aug. 13, 1968 
12. Dec. 22, 1944 
13. Aug. 13, 1968 
14A. May 17, 1950 
14B. Oct. 27, 1965 
14C. July 24, 1946 
15. June 22, 1936 
May 15, 1937 
June 28, 1938 
SAN DIEGO RIVER AND MISSION BAY, CA 
Modification of existing flood control project for 
San Diego River, CA, to include a multiple-purpose project 
for flood control on San Diego River and small-boat 
navigation on Mission Bay. 
SANTA BARBARA HARBOR, CA 
Maintenance dredging present depths into harbor formed 
by breakwater constructed by local interests. 
Permits maintenance by means of a fixed sand-intercepting 
plant to be provided and operated by and at expense of 
local interests. United States to contribute to operating 
expense an amount not to exceed $30,000 annually, 
whenever funds are allotted therefor; funds thus contributed 
to be reduced by actual cost of harbor maintenance if 
and when intercepting plant has been installed. 
Modification of existing project. 
Dredging and maintenance by United States. 
VENTURA MARINA (VENTURA HARBOR), CA 
Adoption and maintenance of existing general navigation 
features of harbor, excluding interior basins; construction 
of an offshore breakwater; dredging a sand trap in lee of 
breakwater; repairing existing north and middle jetties; 
and construction of recreational fishing facilities on 
jetty crests. 
ALAMO LAKE, BILL WILLIAMS RIVER, AZ 
Multiple-purpose dam and reservoir. 
CUCAMONGA CREEK, SANTA ANA RIVER 
BASIN, CA 
Debris-collection facilities, with a system of channels, and 
a diversion system. 
PAINTED ROCK DAM (GILA RIVER), GILA 
RIVER BASIN, AZ 
Dam and flood control basin. 
PHOENIX AZ., AND VICINITY (INCLUDING NEW 
RIVER), tILA RIVER BASIN 
Detention basins, diversion channels, and channel 
improvements. 
WHITLOW RANCH DAM, QUEEN CREEK, GILA 
RIVER BASIN, AZ 
Dam and flood control basin. 
LOS ANGELES COUNTY DRAINAGE AREA, CA 
Reservoirs and flood channels for flood control and related 
purposes at an estimated construction cost not to exceed 
$70 million. 
Added flood channels on Ballona Creek and tributaries to 
project. 
Provision of lands, easements, and rights-of-way and 
relocations by Federal Government nstead of by local 
interests. (Resultant additional cost to the United 
States, $12,541,000.) 
H. Doc. 760, 79th Cong., 
2d sess. 1 
S. Committee Print, 73d 
Cong., 2d sess. 
H. Doc. 348, 77th Cong., 
1st sess. 
H. Doc. 518, 87th Cong., 
2d sess.' 
None 
H. Doc. 356, 90th Cong., 
2d sess. 
H. Doc. 625, 78th Cong., 
2d sess. 
H. Doc. 323, 90th Cong., 
2d sess. 
H. Doc. 331, 81st Cong., 
1st sess. 
H. Doc. 216, 89th Cong., 
1st sess. 
H. Doc. 220, 80th Cong., 
1st sess. 
None 
None 
None 
33-17 
See 
Section in 
Text Documents 
--- L-~ -- -- 
- ~Y

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 33-B (Cont'd) AUTHORIZING LEGISLATION 
See Date of 
Section in Authorizing 
Text Act Project and Work Authorized Documents 
Aug. 18, 1941 
Dec. 22, 1944 
July 24, 1946 
May 17, 1950 
Sep. 3, 1954 
July 3, 1958 
July 14, 1960 
Oct. 23, 1962 
Dec. 30, 1963 
June 18, 1965 
Nov. 17, 1986 
16. Feb. 7, 19852 
17. Oct. 27, 1965 
18. July 14, 1960 
19. May 17, 1950 
20. Dec. 17, 19703 
Nov. 17, 1986 
21. June 22. 1936 
Project extended to include additional flood control 
reservoirs, flood control channels, and debris basins for 
flood control and related purposes. Also authorized to be 
appropriated $25 million for further accomplishment of 
plan. 
Authorized to be appropriated an additional $25 million 
for prosecution of comprehensive plan approved in Flood 
Control Act of Aug 18, 1941. 
Authorized to be appropriated an additional $25 million 
for further prosecution of comprehensive plan. 
Rio Hondo channel improvement, Whittier Narrows 
Reservoir to Los Angeles River (in lieu of enlarging 
channel and bridges on San Gabriel River downstream 
from reservoir). Also authorized to be appropriated 
an additional $40 million for further prosecution of 
comprehensive plan. 
Authorized to be appropriated an additional $12,500,000 
for further prosecution of comprehensive plan. 
Authorized to be appropriated an additional $44 million 
for further prosecution of comprehensive plan. 
Authorized to be appropriated an additional $32 million 
for further prosecution of comprehensive plan. 
Authorized to be appropriated an additional $3,700,000 
for further prosecution of comprehensive plan. 
Authorized to be appropriated an additional $30 million 
for further prosecution of comprehensive plan. 
In addition to all previous authorizations, completion of 
improvements under the comprehensive plan for flood 
control in the Los Angeles River Basin at a presently 
estimated cost of $31 million for completion. 
Authorized modification of Hansen Dam by removing and 
selling dredged material to facilitate flood control, 
recreation, and water conservation. 
LOS COCHES CREEK, SAN DIEGO COUNTY, CA 
Channel improvements. 
LYTLE AND WARM CREEKS, SANTA ANA RIVER 
BASIN, CA 
Channels and levees. 
MOJAVE RIVER DAM, MOJAVE RIVER BASIN, CA 
Dam and reservoir, and an earthfill dike. 
PINE AND MATHEWS CANYONS DAMS, 
COLORADO RIVER BASIN, NV 
Dams and flood control basins. 
SAN LUIS REY RIVER, SAN LUIS REY 
RIVER BASIN, CA 
Channel and levee, and beautification features. 
Authorized non-Federal project cost sharing at a minimum 
of 25 percent and a maximum of 50 percent. 
SANTA ANA RIVER BASIN (AND ORANGE 
COUNTY), CA 
Reservoirs and flood channels for flood control and 
related purposes for protection of metropolitan area of 
Orange County, at an estimated construction cost not to 
exceed $13 million. 
H. Doc. 838, 76th Cong., 
3d sess. 
None 
None 
None 
None 
None 
None 
None 
None 
None 
None 
None 
S. Doc. 53, 89th Cong., 
1st sess. 
H. Doc. 164, 86th Cong., 
1st sess. 
H. Doc. 530, 81st Cong., 
2d sess. 
S. Doc. 91-106, 91st 
Cong., 2d sess. 
None 
None 
33-18

LOS ANGELES, CA, DISTRICT 
TABLE 33-B (Cont'd) AUTHORIZING LEGISLATION 
See Date of 
Section in Authorizing 
Text Act Project and Work Authorized Documents 
June 28, 1938 San Antonio and Chino Creeks channel portion of H. Doc. 688, 75th Cong., 
improvement. Authorized to be appropriated $6,500,000 3d sess. 
for initiation and partial accomplishment of plans for 
those creeks. Rescinded provisions of Flood Control Act 
of 1936, providing that local interests pay for 
relocations, lands, easements, and rights-of-way. 
(Estimated resultant additional cost to United States, 
$3,500,000.) 
Aug. 18, 1941 Authorized to be appropriated an additional $2,500,000 for None 
prosecution of projects approved in above flood control acts. 
Dec. 22, 1944 Authorized to be appropriated an additional $10 million H. Doc. 534, 78th Cong., 
for prosecution of projects adopted in above-mentioned 2d sess.' 
flood control acts, including projects on Lytle and Cajon 
Creeks for local flood protection at San Bernardino and 
Colton, CA. 
July 3, 1958 Authorized to be appropriated an additional $8 million None 
for prosecution of projects approved in abovementioned 
flood control acts. 
SWEETWATER RIVER, SWEETWATER RIVER 
BASIN, CA 
22. Aug. 13, 1968 Channel improvement, as part of a combined flood H. Doc. 148, 90th Cong., 
control and highway project. 1st sess. 
WEST MAGNESIA CANYON CHANNEL, RANCHO 
MIRAGE, CA 
23. Feb. 7, 19852 Debris basin, channel improvements, energy dissipator, None 
and preservation and enhancement of wildlife 
values. 
1. Contains latest published map. 3. Final date of approval by House and Senate Public 
2. Date approved by Chief of Engineers under provisions Works Committees resolution under provisions of section 201, 
of section 205. Public Law 80-858, as amended. Public Law 89-298. 
TABLE 33-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sep. 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Dana Point Harbor, CA Completed 1984 $4,737,5501 555,1472 
Harbor office at Morro Bay, CA - - - 
Los Angeles and Long Beach 
Harbors, San Pedro Bay, CA 3 
Newport Bay Harbor, CA Inactive & 1982 796,8974 621,5455 
Active (mod)3 
Port San Luis, CA Completed & 1984 1,426,0506 1,042,3527 
Active (mod) 
Redondo Beach Harbor 
(King Harbor), CA Completed & 1984 4,766,8989 1,765,252io 
Active (mod)s 
Sunset Harbor (Bolsa Chica 
Bay), CA 3 
1. Excludes $4,777,000 required contributed funds and 
Coast Guard costs. 
2. Includes $45,147 for reconnaissance and condition 
surveys. 
33-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 33-C (Cont'd) 
OTHER AUTHORIZED NAVIGATION PROJECTS 
3. Authorized by Water Resources Development Act of 
1986, Public Law 99-662, November 17, 1986, subject to 
favorable report. 
4. Public Works Administration funds. Excludes $796,897 
required contributed funds and $1,100 preauthorization costs. 
5. Includes $137,622 for reconnaissance and condition 
survey costs since FY 1958. Excludes $7,000 other contributed 
funds. 
6. Includes $568,417 for new work prior to modification 
by 1965 River and Harbor Act. Excludes Coast Guard costs. 
Includes $104,031 expended in FY 1987. 
TABLE 33-D 
7. Includes $54,715 for maintenance for project prior to 
modification by 1965 River and Harbor Act and $18,958 for 
reconnaissance and condition surveys. Includes $90,130 
expended in FY 1987. 
8. Authorized by Water Resources Development Act of 
1986, Public Law 99-662, November 17, 1986. 
9. Excludes Coast Guard costs. 
10. Includes $20,517 for reconnaissance and condition 
survey costs since FY 1958. Includes $293,167 expended in 
FY 1987. 
For Last Cost to Sep. 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Anaheim Bay Harbor, 
Orange County, CA 1 Completed 1967 $89,119 
Bird Rock area, La Jolla, 
San Diego County, CA2 Completed 1967 25,8813 
Coast of California, Point Mugu 
to San Pedro breakwater, CA Completed 1972 1,253,5944 
Doheny Beach State Park (Doheny 
State Beach), CA Completed 1968 578,7175 - 
Imperial Beach, CA Active 1986 2,194,3676 - 
Las Tunas Beach, San Diego 
County, CA Active 1976 107,484 
Ocean Beach, San Diego 
County, CA7 Completed 1960 7,912 - 
Oceanside, San Diego County, CA Completed 1982 4,367,442 - 
San Diego (Sunset Cliffs), CA Active 1979 365,0009 - 
San Gabriel River to Newport Bay 
(Surfside-Sunset and Newport Beach), 
Orange County, CA Active 1985 9,722,100 - 
Ventura-Pierpont area, CA Completed (part) 1969 715,81911 - 
& Deferred (part) 
1. The project authorized by the Act of Congress of 
October 23, 1962, H. Doc. 602, 87th Cong., 2d sess., in lieu of 
part of the original Anaheim Bay Harbor project is covered 
under San Gabriel River to Newport Bay (Surfside-Sunset 
and Newport Beach), Orange County, CA. 
2. Authorized by Chief of Engineers under authority of 
section 103, Public Law 87-874. 
3. Excludes 75,614 required contributed funds. 
4. Excludes 1,238,418 required contributed funds. 
5. Excludes 431,260 required contributed funds. 
6. Excludes $919,437 required contributed funds; $66,124 
other contributed funds; and Coast Guard costs. 
7. Plant in service. 
8. Excludes $604,817 other contributed funds. 
9. Excludes $180,438 required contributed funds. 
10. Excludes $4,626,638 for required contributed funds. 
Includes $10,772 expended in FY 1987. 
11. Excludes $117,406 other contributed funds for beachnourishment 
betterments and $618,949 required contributed 
funds. 
33-20 
OTHER AUTHORIZED BEACH EROSION 
CONTROL PROJECTS

LOS ANGELES, CA, DISTRICT 
TABLE 33-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Allenville, AZ' Completed 1984 $3,000,000 - 
City Creek levee, San Bernardino 
County, CA' 
Gila River Basin, AZ: 
Camelsback Dam (Gila River) 
Gila and Salt Rivers levee and 
channel improvements 
Indian Bend Wash 
Lower Gila River levee and channel 
improvements (Gila River and 
tributaries downstream from 
Painted Rock Dam) 
Middle Gila River channel 
improvements, upper end of 
Safford Valley to Buttes damsite 
(Camelsback damsite to 
Salt River) 
Pinal Creek channel improvements 
(Globe) 
Santa Rosa Wash (Tat 
Momolikot Dam and 
Lake St. Clair) 
Tucson diversion channel 
Goleta, CA, and vicinity 
Hansen Dam, Los Angeles County 
drainage area, CA (modification) 
Holbrook levee, Little Colorado 
River, Colorado River Basin, AZ 
Little Colorado River at Holbrook, AZ 
Needles, San Bernardino County, 
CA' 
Oro Grande Wash channel improvements, 
Mojave River Basin, CA' 
Quail Wash levee, Joshua Tree, San 
Bernardino County, CA' 
Ridgecrest, Kern County, CA' 
Rose Creek channel improvements, 
San Diego, CA' 
San Diego River (Mission Valley), 
San Diego River Basin, CA 
Santa Ana River Basin, CA: 
Devil, East Twin, and Warm 
Creeks channel improvements 
and Lytle Creek levee 
Mill Creek levees 
Riverside levees 
San Jacinto River levee and 
Bautista Creek channel 
Santa Clara River levee improvement, 
Santa Clara River 
Basin, CA 
Santa Maria Valley levees, Santa 
Maria River Basin, CA 
Santa Paula Creek channel and 
debris basins (including 
Mud Creek), Santa Clara 
River Basin, CA 
Sespe Creek at Fillmore, Ventura 
County, CA' 
Completed 
Deferred 
Active (part) 
& Deferred (part) 
Completed 
Inactive 
Active 
Deferred 
Completed 
Completed 
Active 
Completed 
Completed 
Completed 
Completed 
Terminated 
Completed 
Inactive 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Active 
Completed 
400,000$ 
1963 
1966 
1985 
1975 
1970 
1968 
1982 
1986 
1982 
1950 
1973 
1970 
1973 
1972 
1978 
1962 
1961 
1959 
1985 
1961 
1984 
1983 
1984 
73,2014 
31,809,294' 
2,413,051 
402,867 
121,509' 
10,218,900 
6,922,6316 
500,000 
335,000 
1,000,0008 
1,000,0009 
212,745 
195,194 
982,43210 
1,708,437 
7,753,93711 
617,89012 
2,104,478 
9,258,2071" 
2,126,672 
10,079,92714 
4,790,1731 
4,000,00016 
33-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 33-E (Cont') 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
South Fork of the Santa 
Clara River, Santa 
Clarita Valley, CA' Active 1985 632,158 
Telegraph Canyon Creek, 
Chula Vista, CA' Active 1985 844,732 7 - 
Tijuana River Basin, CA Completed 1979 1,703,03118 
Ventura River Basin, CA: 
Stewart Canyon debris basin and 
channel Completed 1964 939,90819 
Ventura River levee Completed 1950 1,349,63820 
Whitewater River, CA 7 
Whitewater River Basin, CA: 
Banning levee-San Gorgonio 
River, Riverside County1 Completed 1966 97,868 
Chino Canyon improvements, 
Palm Springs Completed 1973 819,87821 
Tahchevah Creek detention basin 
and channel improvements Completed 1967 1,420,55222 
Tahquitz Creek Inactive 1974 1,063,600 
Winslow (tributaries of Little 
Colorado River), Little Colorado 
River Basin, AZ Completed (part) 1973 1,831,300 
& Deferred (part) 
1. Authorized by Chief of Engineers under authority of 11. Excludes $200,000 required contributed funds and 
section 205, Public Law 80-858, as amended. $1,641,668 other contributed funds. 
2. Excludes $187,965 required contributed funds. 12. Excludes $35,830 other contributed funds. 
3. Excludes $371,058 other contributed funds. 13. Excludes $712,000 other contributed funds. 
4. Advance planning only. 14. Excludes $106,364 other contributed funds. Includes 
5. Excludes $304,720 required contributed funds and $74 expended in FY 1987. 
$3,130,762 other contributed funds. Includes $31,071 15. Excludes non-Federal costs of $295,000 for local 
expended in FY 1987. cooperation items not required and $49,458 other contributed 
6. Includes $1,158,006 Code 710 funds since FY 1977. funds. Includes $20,652 expended in FY 1987. 
Excludes $749,058 required contributed funds and $394,364 16. Excludes $559,525 required contributed funds. 
other contributed funds. 17. Includes $3,846 expended in FY 1987. Excludes 
7. Authorized by Water Resources Development Act of $104,941 other contributed funds. 
1986, Public Law 99-662, November 17, 1986. 18. International Boundary and Water Commission funds. 
8. Excludes $619,912 required contributed funds and 19. Excludes $179,148 other contributed funds. 
$91,160 other contributed funds. 20. Includes $6,000 Code 710 funds since FY 1977. Excludes 
9. Excludes $514,806 required contributed funds and $17,006 other contributed funds. 
$176,295 other contributed funds. 21. Excludes $8,718 required contributed funds and $53,470 
10. Excludes $251,000 required contributed funds and other contributed funds. 
$154,733 other contributed funds. 22. Excludes $74,718 required contributed funds. 
TABLE 33-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Date Federal Contributed 
See Annual and Funds Funds 
Project Report For Authority Expended Expended 
Hodges Dam, San Dieguito 
River Basin, CA 1958 1978 
Sec. 12, Public 
Law 93-251 
33-22

LOS ANGELES, CA, DISTRICT 
TABLE 33-G (Cont') DEAUTHORIZED PROJECTS 
For Last 
Full Report Date Federal Contributed 
See Annual and Funds Funds 
Project Report For Authority Expended Expended 
Las Vegas Wash tributaries, 
Colorado River Basin, NV 1964 1977 $295,191 
Sec. 12, Public 
Law 93-251 
Santa Ana River Basin 
(and Orange County), CA: 
Aliso Creek Dam - 1986 
Sec. 1002, Public 
Law 99-662 
San Juan Dam 1950 1986 67,361 
Sec. 1002, Public 
Law 99-662 
Trabuco Dam - 1986 
Sec. 1002, Public 
Law 99-662 
Villa Park Dam - 1978 
Sec. 12, Public 
Law 93-251 
Sierra Madre Wash channel, 
Los Angeles County drainage 
area, CA 1986 1986 
Sec. 1002, Public 
Law 99-662 
University Wash and Spring Brook, 
Riverside, CA 1975 1986 213,313 - 
Sec. 1002, Public 
Law 99-662 
TABLE 33-H RECONNAISSANCE AND CONDITION SURVEYS 
(See Section 11 of Text) 
Project Date 
Newport Bay Harbor, CA October 1986 
Santa Barbara Harbor, CA June 1987 
Ventura Marina (Ventura Harbor), CA April 1987 
TABLE 33-I INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
(See Section 24 of Text) 
Project Date 
Rose Creek channel improvements, San Diego, CA July 1987 
San Diego River channel and levees, San Diego River Basin, CA July 1987 
33-23 
- -- --- -- -- --- -- ----- LI

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
Flood Control Activities Pursuant to Section 205, Public Law 80-858, 
As Amended (Preauthorization) 
TABLE 33-J (See Section 26 of Text) 
Project Fiscal Year Costs 
Ephriam Canyon Wash, Nogales, AZ $250 
Lake Elsinore, Riverside County, CA 99,238 
Mission Zanja Creek, CA 9,119 
Rialto Channel, Rialto, CA 109,538 
Santa Clara River, Fillmore, CA 42,169 
33-24

SAN FRANCISCO, CA, DISTRICT * 
This district comprises the Klamath River Basin in 
southern Oregon and portions of northern and western 
California consisting of drainage basins tributary to the 
Pacific Ocean from the Oregon-California State line on 
the north to Cape San Martin, CA, on the south, except 
for basins tributary to the San Francisco Bay system 
which lie east of the Benicia-Martinez Bridge. 
IMPROVEMENTS 
Navigation Page 
1. Fisherman's Wharf Area, 
San Francisco Harbor, CA .............. 34-1 
2. Richmond Harbor (Deepening), CA ...... 34-2 
3. San Francisco Bay to Stockton, CA 
(John F. Baldwin and Stockton 
Ship Channels) ....................... 34-2 
4. San Francisco Bay and 
Delta Model, CA ........................ 34-2 
5. Santa Cruz Harbor, CA .............. 34-3 
6. Reconnaissance and Condition 
Surveys .............................. 34-3 
7. Navigation Work under Special 
Authorization .......................... 34-3 
Flood Control 
8. Inspection of Completed Flood 
Control Projects ...................... 34-3 
9. Flood Control Work under Special 
Authorization ........................ 34-4 
General Investigations 
10. Surveys ................................ 
11. Collection and Study of Basic Data....... 
12. Preconstruction Engineering 
and Design .. .......................... 
Page 
34-4 
34-4 
34-4 
Tables 
Table 34-A Cost and Financial 
Statement .................. 34-5 
Table 34-B Authorizing Legislation ....... 34-8 
Table 34-C Other Authorized 
Navigation Projects .......... 34-8 
Table 34-D Other Authorized Beach 
Erosion Control Projects ....... 34-9 
Table 34-E Not Applicable 
Table 34-F Not Applicable 
Table 34-G Deauthorized Projects ......... 34-9 
Navigation 
1. FISHERMAN'S WHARF AREA, SAN 
FRANCISCO HARBOR, CA 
Location. Fisherman's Wharf is located on San 
Francisco Bay on the northern waterfront of the City of 
San Francisco, approximately 2-1/2 miles east of the 
Golden Gate Bridge. (See USGS Quad Sheet San 
Francisco North, Calif. N3745-W12222.5/7.5) 
Existing project. The project consists of a concrete 
sheet pile breakwater starting 150 feet to the west of 
Hyde Street Pier; curving around the end of Hyde 
Street Pier and extending in an easterly direction to an 
extension of the east fender line of Pier 45. The entrance 
is a 165-foot channel between the breakwater and the 
end of Pier 45. The total length of this sheet pile 
breakwater is 1,509 feet. In addition there are two 
segmented breakwaters (28-foot solid walls with 6-foot 
openings), one 150 feet long extending in a northerly 
direction in the abandoned slip at the end of Pier 45, and 
the second is a 250-foot section 250 feet from the 
bayward end of, and on the west side of Pier 45. Also 
included are two 10-foot wide caps which may be used 
as walkways for the purpose of recreational pier fishing. 
Pedestrian access is constructed to the 150-foot segmented 
break-water. Access to the 1,509-foot solid 
breakwater, included in Phase II Construction is delayed 
indefinently until reconstruction of Hyde Street Pier by 
locals. Federal and non-Federal costs were $8,293,695 
and $722,275, respectively. Construction contract was 
awarded in February 1985 to Riedel International, Inc. 
of Portland, OR. Total contract award was $7,887,000 
with final contract cost being $7,818,375. Construction 
was completed in October 1986. 
Local cooperation. The Agreement of Local Cooperation, 
along with estimated costs, was negotiated 
34-1 
_ ____ I

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
with, and accepted by, the local sponsor. The 221 
Agreement was signed by the local sponsor on 13 November 
1984. 
Terminal facilities. Project protects existing commercial 
and recreational waterfront structures: commercial 
fishing fleet and fish handling structures; 
recreational small craft harbor; and Hyde Street Pier 
used for historic ship berthing. 
Operations during fiscal year. New Work: Monitor 
completed construction. 
2. RICHMOND HARBOR 
(DEEPENING), CA 
Location. Richmond Harbor is located in central San 
Francisco Bay, in Contra Costa County near the City of 
Richmond. 
Existing project. The existing navigation channel 
extends from deep water in San Francisco Bay to the 
Port of Richmond. The channel is maintained at a depth 
of -35 feet MLLW, except at its terminus in the upper 
Santa Fe Channel where the depth decreases to -30 feet 
MLLW. The width of the navigation channel is 600 feet 
for most of its depth. At Point Potrero, however, the 
channel flares into a turn and then continues at a width 
of 850 feet in a northerly direction to the entrance of the 
Santa Fe Channel. A rubble-mound training wall 
extending 10,000 feet from Brooks Island is also 
provided in the Potrero Reach. 
Proposed improvements consists of a two-phased 
construction plan extending four miles through the 
Inner Harbor. Phase I would deepen the existing 35- 
foot channel to -38 feet for bulk carriers, and provide a 
turning basin of 1,200 feet diameter near Point Potrero. 
Approximately 1,400,000 cubic yards of sediment are to 
be dredged and transported to an ocean disposal site. In 
addition, 2,600 cubic yards of rock are to be excavated 
and disposed of at the Port-owned land disposal site. 
The estimated cost of Phase I is $10,250,000. Phase II 
will be deferred and is reclassified to the inactive 
category. 
The existing project was authorized on October 27, 
1965. Subsequent projects were authorized by Acts 
adopted in 1917, 1930, 1935, 1938, 1945 and 1954. The 
proposed improvements are authorized by the Water 
Resources Development Act of 1986, PL 99-662. 
Local cooperation. The local sponsor is the City of 
Richmond which would provide an access channel, 
share 25% of the project cost during construction and 
repay an additional 10% over 30 years. 
Terminal activities. The Port of Richmond encompasses 
ten privately-owned terminals and six terminals 
owned by the Port. 
Operations during fiscal year. Complete preconstruction 
planning and engineering. 
3. SAN FRANCISCO BAY TO 
STOCKTON, CA (JOHN F. 
BALDWIN AND STOCKTON 
SHIP CHANNELS) 
Location. John F. Baldwin Ship Channel. On 
navigation channels extending from entrance to San 
Francisco Bay to vicinity of Concord through San 
Francisco, Marin, Contra Costa, and Solano Counties. 
(See National Ocean Service Charts 18649, 18654 and 
18656 for respective areas.) 
Existing project. Project provides for modification 
of the existing San Francisco Harbor, Richmond Harbor, 
San Pablo Bay and Suisun Bay Channels to the 
vicinity of Concord to provide depths of 55 feet for San 
Francisco Bar Channel, 45 feet (currently 35 feet) for 
main internal bay channels upstream to the vicinity of 
Concord; enlargement and deepening to 45 feet (currently 
35 feet) of maneuvering areas adjacent to major 
petroleum refinery terminals along the channel route; 
and widening the Suisun Bay Channel. San Francisco 
Harbor Main Channel was completed in February 
1974. The South Hampton Shoal Channel and the 
Richmond Long Wharf manevering area was completed 
in December 1986. For the approved cost estimate 
(1987) of Federal cost (Corps), see Sacramento District 
Annual Report. Existing project was adopted by 1965 
River and Harbor Act (H. Doc. 208, 89th Cong., 1st sess., 
contains latest published map). 
Local cooperation. See Sacramento District Annual 
Report. The local sponsor, Contra Costa County, supports 
the project. 
Terminal facilities. See Port Series No. 30, revised 
1983, No. 31, revised 1982, and No. 32, revised 1986, 
titled respectively: "The Ports of San Francisco, Redwood 
City, and Humboldt Bay, Calif."; "The Ports of 
Oakland, Alameda, Richmond, and the Ports on Carquinez 
Strait, Calif."; and "The Ports of Sacramento, 
Stockton, Pittsburg, and Antioch, Calif." Facilities are 
considered adequate for existing commerce and will be 
adequate for future commerce upon completion of new 
terminal facilities. 
Operations during fiscal year. New Work: Continued 
planning engineering and design activities. 
4. SAN FRANCISCO BAY AND 
DELTA MODEL, CA 
Location. The model, including a regional visitor 
center, is located in Sausalito, CA, adjacent to San 
Francisco Bay about two miles north of the Golden Gate 
Bridge. 
Existing project. The San Francisco Bay/Delta 
Model, which covers 17 miles of the Pacific Ocean 
beyond the Golden Gate, all of San Francisco Bay 
proper, San Pablo Bay, Suisun Bay, and all of the 
Sacramento-San Joaquin Delta east of Suisun Bay to 
the cities of Sacramento on the northeast and Stockton 
34-2

SAN FRANCISCO, CA, DISTRICT 
and Tracy on the south, was constructed in a rehabilitated 
warehouse at Sausalito, CA, as a part of the San 
Francisco Bay and Tributaries, CA, Study authorized 
by the River and Harbor Act of May 17, 1950 (PL 81- 
516, Section 110). The model was authorized as an 
operation and maintenance project in the Water Resources 
Development Act of 1974 (PL 93-251, Section 8). 
The model successfully reproduces to the proper scale 
the rise and fall of the tide, flow and currents of water, 
salinity intrusion, and trends in disposition of sediments. 
It is a useful tool to examine forces existing in the bay 
and estuarine system and to predict results of proposed 
changes. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: Operation 
and maintenance of the model continues. 
Historical summary. Original model construction 
was initiated 1956 and completed 1957. The addition of 
the Sacramento-San Joaquin Delta to the original 
model was initiated 1966 and completed 1969. The 
central exhibits were completed in December 1981. 
Continued testing of proposals affecting the environmental 
quality of the region including, but not limited 
to: salinity intrusion, dispersion of pollutants, water 
quality, improvements for navigation, dredging, bay 
fill, physical structures, other shoreline changes. Total 
cost of regional visitor exhibits and model as of September 
30, 1987, was $13,779,656, of which $5,375,340 
was for the regional visitor center, $911,895 for exhibits, 
and $7,492,421 for maintenance. 
5. SANTA CRUZ HARBOR, CA 
Location. Santa Cruz Harbor is located on the 
northernmost part of Monterey Bay, near the southeastern 
boundary of the City of Santa Cruz. 
Existing project. Adopted by Act of July 3, 1958. 
Provided for construction of jetties, 850 feet (south jetty) 
and 1,125 feet long. The entrance channel is 100 feet 
wide, 20 feet deep, and 900 feet long, with an additional 
370 feet at a depth of 15 feet. The inner harbor channel 
is 15 feet deep, 150 feet wide, and 800 feet long, with an 
additional 600 feet, 10 feet deep. The turning basin is 
300 feet wide, 207 feet long and 10 feet in depth. 
Project authorization also provided for a sand bypassing 
plant, if required. A cooperative agreement 
finalized in April 1986, provides the Santa Cruz Port 
District with a bypass system to be used in Santa Cruz 
Harbor. The primary component of the system is a 16 
inch hydraulic dredge. The federal government shared 
in the cost of the dredge system in return for the Port 
District assuming full responsibility for channel 
maintenance for the remaining life of the authorized 
project. The Port District assumed responsibility of 
maintenance dredging upon delivery of the dredge 
system in October-November 1986. 
Local cooperation. See above concerning the Cooperative 
Agreement for the dredge system. 
Terminal facilities. N/A 
Operations during fiscal year. Procurement of 
dredge system. The Port District will assume responsibility 
for maintenance of the harbor during FY 
87. 
6. RECONNAISSANCE AND 
CONDITION SURVEYS 
Reconnaissance and condition surveys of channels to 
be dredged in years other than FY 87 were conducted 
on the following projects: Berkeley Harbor; Bodega 
Bay; Monterey Harbor; Napa River; Redwood City 
Harbor; Richardson Bay Channel; San Leandro Marina; 
San Pablo and Mare Island Straits; San Rafael Creek; 
and Suisun Channel, all in California. Fiscal year costs 
were $319,409 of which $33,879 was for jetty condition 
surveys and $285,530 for project condition surveys. 
7. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to section 107, Public 
Law 86-645 (preauthorization). 
Fiscal year total costs for preauthorization studies 
were $74,244 of which $7,400 was for Humboldt Bay, 
Field Landing, CA and $66,844 for Larkspur Ferry, 
Marin County, CA. 
8. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Section 3, Flood Control Act of June 22, 1936, as 
amended and supplemented, included a requirement 
that local interests maintain and operate completed 
flood control works in accordance with regulations 
prescribed by the Secretary of War. Inspections made 
throughout the year to determine effectiveness of 
operation and maintenance by local interests of completed 
local protection projects and works constructed 
under emergency and special authorities of Sections 
205 and 208 of the 1948 Flood Control Act, Section 14 of 
the 1946 Flood Control Act, and Public Law 99, 84th 
Congress. Fiscal year cost was $373,695. Total cost to 
September 30, 1987 was $1,557,898. Projects inspected 
included Alameda Creek, October 1986; Butte Creek, 
August 1987; Canyon Creek, August 1987; Coffee Creek, 
August 1987; Colma Creek, March 1987; Corte Madera 
Creek, November 1986; Coyote Creek, November 1986; 
East Weaver Creek, August 1987; Eel River at Sandy 
Prairie, May 1987; Eel River at Lolita Bottoms, June 
1987; Klamath River, May 1987; Klamath River, OR, 
August 1987; Mad River at Blue Lake, May 1987; Mark 
West Creek, May 1987; Meiss Lake, August 1987; 
Pajaro River, September 1987; Pinole Creek, April 
1987; Redwood Creek, June 1987; Rheem Creek, April 
1987; Rodeo Creek, April 1987; Russian River, May 
1987; Salinas River, July 1987; San Leandro Creek, 
October 1986; San Lorenzo Creek, October 1986; San 
Lorenzo River, October 1986; Santa Rosa Creek, May 
1987; Smith River, June 1987; Sonoma Creek, June 
34-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
1987; Van Duzen River, June 1987 and Wildcat Creek, 
March 1987. 
9. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood Control activities pursuant to Section 205, 
Public Law 858, 80th Congress, as amended (preauthorization). 
Fiscal year costs were $103,358 for preauthorization 
studies of which $3,200 was for Klamath River, CA; 
$7,500 for Mattadero/Barron Creeks, St. Clara County, 
CA; $13,363 for Pescadero and Butano Creeks, CA; 
$36,731 for Petaluma River, Sonoma County, CA; 
$29,135 for Rohner Creek, Fortuna, CA; $12,435 for San 
Pedro Creek, Pacifica, CA; and $994 for Soquel Creek, 
Santa Cruz County, CA. 
Emergency flood control activities--repair, flood 
fighting and rescue work (Public Law 99, 84th 
Congress, and antecedent legislation). 
Fiscal year costs of $1,913,998 were incurred for 
emergency flood control activities, of which $224,666 
was for disaster preparedness; $93,463 for emergency 
operations; and $200,541 for field investigation; and 
$1,395,328 for rehabilitation. 
Emergency bank protection (Section 14, 1946 
Flood Control Act, Public Law 526, 79th Congress). 
Fiscal year costs were $13,507 for emergency bank 
protection of which $566 was for Humboldt County, 
Wilder Ridge Road, CA; $4,246 for Marina County 
WWTP, CA; $1,800 for Pacifica, Beach Boulevard, CA; 
$815 for Shelter Cove Resort Improvement District #1, 
CA; $4,926 for Trinity County, Hyampon, Trinity Cove, 
CA; and $1,154 for Trinity County Ruth Airport, CA. 
General Investigations 
10. SURVEYS 
Fiscal year costs for surveys were $1,177,247, of 
which $24,448 was for navigation; $1,103,250 for flood 
damage prevention; $46,549 for inventory of dams; and 
$3,000 for coordination with other agencies. 
11. COLLECTION AND STUDY OF 
BASIC DATA 
Fiscal year total costs of $38,145 were incurred, of 
which $36,125 was for flood plain management service 
program and $2,020 was for hydrologic studies. 
12. PRECONSTRUCTION 
ENGINEERING AND DESIGN 
Fiscal year total costs were $641,960 of which $174 
was for Fisherman's Wharf, CA, $829 for Noyo River 
and Harbor (Breakwater), CA; $534,921 for Oakland 
Inner Harbor, CA; $41,641 for Oakland Outer Harbor 
(Deepening), CA, and $64,395 for Richmond Harbor, 
(Deepening), CA. 
34-4

SAN FRANCISCO, CA, DISTRICT 
TABLE 34-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep 30, 1987 
Bodega Bay, CA 
Crescent City 
Harbor, CA 
1. Fisherman's Wharf 
Area, San Francisco 
Harbor, CA 
Halfmoon Bay, CA 
Humboldt Harbor 
and Bay, CA 
Moss Landing 
Harbor, CA 
Napa River, CA 
Noyo River and 
Harbor, CA 
Oakland Harbor, CA 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
4,314 
16,270 
16,270 
- 1,226,765' 2 
- 1,226,7651 3 
204,651 
179,999 
67,210 39,374 1,121,8994 
82,427 42,542 1,115,6324 
397,7795 
397,7795 
850,808 
230,000 
2,333,215 
-44,000 
11,409 
1,093,278 
1,657,383 
1,993 
5,110,486 
5,004,776 
- 9,454,9726 
- 9,454,9726 
777,000 19,264,7387 
850,714 19,221,7177 
- - - - 525,0008 
- - - - 525,0008 
350,000 3,000,000 5,265,000 -116,000 8,499,00041 
180,543 1,138,269 7,151,055 27,839 8,317,7064' 
- - - - 6,697,39643 44 
- - - - 6,697,39643 44 
- 271,000 
- 241,765 
10,000 -3,700 2,084,36743 44 
36,818 -1,244 2,084,36744 45 
- - - - 9,847,2999 40 
- - - - 9,847,2999 40 
1,475,009 6,107,060 4,236,000 2,369,000 56,302,94110 40 
6,304,195 6,983,429 4,414,387 2,342,236 56,236,46210 40 
- - - - 338,215" 40 
- - - - 338,21511" 40 
448,000 161,583 
427,295 164,383 
38,254 
43,816 
275,000 
156,999 
530,000 
991,649 
-426 
-426 
115,747 
405,000 
470,898 
36,570 465,000 4,431,78412 40 
52,051 467,211 4,418,57612 40 
26,583 
26,583 
12,423 
598,000 
534,352 
- 1,021,27413 40 
- 1,021,27413 40 
6,412 1,846,63213 14 40 
6,412 1,846,632'3 14 40 
829 
422,000 
445,886 
1,521,48215 16 
1,521,48215 17 
6,675,65418 19 
6,629,48018 19 
S- - - 222,81020 40 
- - - - 222,81020 40 
- - - - 9,646,98421 40 
- - - - 9,646,98421 40 
1,294,000 1,325,973 1,075,000 2,620,200 31,337,44622 40 
1,251,503 1,414,766 1,060,589 2,582,782 31,271,89222 40 
34-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 34-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
Petaluma River, CA 
Redwood City 
Harbor, CA 
2. Richmond Harbor, CA 
3. San Francisco Bay 
to Stockton, CA 
(John F. Baldwin and 
Stockton Ship 
Channels) 
4. San Francisco Bay 
and Delta Model, CA 
San Francisco 
Harbor, CA 
San Francisco 
Harbor and Bay, CA 
(Removal of Drift) 
San Leandro 
Marina, CA 
San Pablo Bay 
and Mare Island 
Strait, CA 
San Rafael, CA 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
297, 14623 40 
297,14623 40 
1,025,407 
1,797,546 
26,272 -168,185 755,000 8,568,65324 40 
446,628 -115,226 729,877 8,541,83124 40 
- 1,672,72225 40 
- 1,672,72225 40 
3,079,000 -588,465 14,674 
2,868,440 -374,925 14,674 
- 15,000 370,000 
- - 345,184 
2,047,000 601,226 1,074,000 
2,663,006 1,136,050 1,097,818 
59,010 
59,010 
561,000 
598,484 
1,811,300 
1,803,232 
7,399,63826 40 
7,399,63826 40 
3,832,69527 28 
3,830,36327 28 
18,383,64229 
18,364,92328 
-- - - 164,689 
-- - - 164,689 
1,200,000 10,580,000 5,166,000 1,937,000 26,225,200 
628,744 10,246,428 5,877,031 2,216,315 26,010,596 
1,141,000 1,159,000 1,100,000 980,000 13,862,700 
1,400,852 1,089,231 1,067,138 1,077,118 13,779,658 
- - - 2,689,35628 30 
- - - 2,689,35628 30 
424,860 2,087,500 1,566,340 1,593,036 24,082,28131 
478,865 2,042,272 1,726,548 1,595,213 24,060,50331 
- - - - 40 
- - - - 40 
1,143,000 1,018,000 930,000 1,305,000 22,281,182 
1,040,828 1,010,551 1,047,460 1,109,605 21,945,319 
410,176 147,205 
274,097 261,171 
44,171 38,337 1,284,24032 
66,284 38,337 1,284,24032 
-- - - 1,369,37228 33 
-- - - 1,369,37228 33 
3,696,143 1,725,125 1,939,000 1,898,935 34,210,63634 
3,615,383 1,996,024 1,978,259 1,848,904 34,158,61634 
- - - 32,35940 47 
- - - 32.35940 47 
26,924 
26,924 
8,545 970,994 626,591 3,614,95540 46 
8,545 932,781 629,727 3,597,87840 46 
34-6

SAN FRANCISCO, CA, DISTRICT 
TABLE 34-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
5. Santa Cruz New Work 
Harbor, CA Approp. - 120,000 2,134,000 - 4,106,340 
(Federal Funds) Cost - 94,699 1,960,377 198,922 4,106,338 
(Contrib. Funds) New Work 
Contrib. - - - - 160,00035 
Cost - - - - 160,00035 
Maint. 
Approp. 659,000 834,000 994,500 64,000 9,538,659 
Cost 769,335 935,374 1,035,571 59,497 9,524,524 
Suisun Bay Channel, New Work 
CA Approp. - - - - - 36 
Cost - - - - - 36 
Maint. 
Approp. 312,000 204,725 1,797 174,000 2,935,86036 37 
Cost 305,091 204,887 8,568 160,402 2,919,37636 37 
Suisun Channel, CA New Work 
Approp. - - - - 217,67738 
Cost - - - - 217,67738 
Maint. 
Approp. 15,130 651 51,594 92,312 1,495,64439 
Cost 15,130 651 51,594 92,312 1,495,64439 
1. Includes $641,800 for jetties, bulkheads, main Bodega 
Bay Channel and turning basin completed in 1943. 
2. Includes $585,000 for Preconstruction Planning 
($456,000 Construction, General funds and $129,000 General 
Investigation funds). 
3. Includes $584,563 Preconstruction Planning costs 
($455,563 Construction, General costs and $129,000 General 
Investigation costs). 
4. Includes $187,349 for reconnaissance and condition 
surveys, FY 1956-1987. 
5. Excludes contributed funds of $2,000. 
6. Excludes contributed funds of $271,116 and $2,138 
surplus material from Corps military activities. 
7. Excludes contributed funds of $44,340. Includes 
$75,795 for reconnaissance and condition surveys, FY 1956- 
1987.
8. Excludes $2,000 contributed funds in lieu of royaltyfree 
rock. 
9. Includes $2,261,371 for previous project. Excludes 
$95,000 contributed funds for existing project. 
10. Includes $98,206 for previous project and $1,710 for 
reconnaissance and condition surveys, FY 1956-1987. 
11. Excludes $5,337 previous project costs. 
12. Excludes $8,539 surplus material from Corps' military 
activities. Includes $67,265 for reconnaissance and condition 
surveys, FY 1956-1987. Excludes contributed funds of 
$180,200. 
13. Excludes previous project costs. Excludes $154,500 
contributed funds. 
14. Includes $274,508 for reconnaissance and condition 
surveys, FY 1956-1987. 
15. Includes $11,985 for previous project. Excludes $7,180 
contributed funds for previous project. 
16. Includes $1,223,000 for Preconstruction Planning 
($773,000 for Breakwater of which $500,000 allocated under 
Construction, General and $273,000 under General Investigations); 
($450,000 for Channel Extension of which $165,000 
allocated under Construction, General and $285,000 under 
General Investigations). 
17. Includes $1,223,001 Preconstruction cost ($773,001 for 
Breakwater of which $500,000 was under Construction, 
General and $273,001 under General Investigations); ($450,000 
for Channel Extension of which $165,000 under Construction, 
General and $285,000 under General Investigations). 
18. Includes $32,097 for previous project and $15,436 for 
reconnaissance and condition surveys, FY 1956-1987. Excludes 
contributed funds of $820 for previous project. 
19. Excludes contributed funds of $4,000 in lieu of providing 
dike disposal areas on existing project. 
20. Excludes contributed funds of $1,700. 
21. Includes $2,899,232 for previous projects. Excludes 
$397,266 contributed funds on existing project. 
22. Includes $684,028 for previous projects and $774 for 
reconnaissance and condition surveys, FY 1956-1987. 
23. Includes $212,083 for previous project. Excludes contributed 
funds of $15,559 for previous project. 
24. Includes $314,692 for previous project and $122,402 
for reconnaissance and condition surveys, FY 1956-1987. Excludes 
contributed funds of $178,308. 
25. Includes previous project costs $31,443. Excludes 
$119,572 contributed funds for existing project. 
26. Includes $165,378 for reconnaissance and condition 
surveys, FY 1956-1986. 
27. Excludes contributed funds of $524,778. Includes 
$105,000 Public Works Administration funds. 
28. Excludes modification authorized October 27, 1965, 
under project "San Francisco Bay to Stockton, CA (John F. 
Baldwin and Stockton Ship Channels)." 
29. Excludes $34,800 contributed funds. Includes $3,364 
for reconnaissance and condition surveys, FY 1956-1987. 
30. Includes $1,030,399 for previous projects. Excludes 
$134,591 contributed funds for existing project. Includes 
$193,000 Public Works Administration funds. 
31. Includes $475,321 for previous projects and $55,195 
for reconnaissance and condition surveys, FY 1956-1987. 
32. Authorized by FC Act of 1965 (Sec. 201); Maintenance 
R&H Act of 1970 (Sec. 103). Includes $139,440 for reconnaissance 
and condition surveys FY 1979-1987. See FY 1977 
Annual Report for last full report. Excludes contributed 
funds of $746,947. 
33. Includes $1,086,703 for previous projects. 
34. Includes $1,359,380 for previous projects and $7,307 
for reconnaissance and condition surveys, FY 1956-1987. 
35. Excludes $810,046 contributed funds. 
34-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 34-A (Cont'd) COST AND FINANCIAL STATEMENT 
36. See Sacramento District FY 1974 Annual Report for 
details. 
37. Project maintenance responsibility to Point Edith was 
transferred to San Francisco District January 1, 1974. Excludes 
Sacramento District's portion. Includes $11,610 for reconnaissance 
and project condition surveys, FY 1976-1987. 
38. Project maintenance assigned to San Francisco District 
from Sacramento District January 1, 1974. See Sacramento 
District 1972 Annual Report for full report. 
39. Includes $188,135 for reconnaissance and condition 
surveys, FY 1978-1986. 
40. See FY 1981 Annual Report for last full report. 
TABLE 34-B AUTHORIZIN( 
41. Excludes Contributed Funds of $709,624. 
42. See Sacramento District FY 1985 Annual Report for 
full report. 
43. Excludes $100,000 contributed funds and $105,000 
contributed in lieu of royalty-free rock. 
44. See FY 1979 Annual Report for last full report. 
45. Includes $17,567 for reconnaissance and condition 
surveys, FY 1970-1987. 
46. Includes $157,008 for reconnaissance and condition 
surveys, FY 1970-1987. 
47. Excludes $41,094 contributed funds. 
G LEGISLATION 
See Date 
Section in Authorizing 
Text Act Project and Work Authorized Documents 
1. FISHERMAN'S WHARF AREA-SAN FRANCISCO 
CA 
Nov. 14, 1983 Breakwater. Cont. Res. (H.J. Res. 413) 
of 1984, Public Law 
98-151, 98th Cong., 
1st sess. 
TABLE 34-C GTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sep 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Berkeley Harbor, CA' 
Berkeley Marina, CA' 
Lower San Francisco Bay, CA 
Monterey Harbor, CA 
San Francisco Marina (Gas House Cove), 
CA' 
San Francisco Harbor (Islais Creek), CA' 
San Leandro Marina (Breakwater), CA' 
1. Authorized by Chief of Engineers (Sec. 107, Public 
Law 86-645). 
2. Excludes $155,551 contributed funds. 
3. Excludes $378,989 contributed funds. 
4. Includes $207,800 Public Works Administration funds 
breakwater modifications (1960 Act) placed inactive 
The barrier groin and sandtrap feature of the project 
eauthorized November 17, 1986, by WRDA of 1986. 
5. Includes $8,041 for reconnaissance and condition 
surveys for FY 1956-1987. 
6. Includes preauthorization costs $26,855 and excludes 
contributed funds $153,618. 
7. Includes $94,550 preauthorization costs. 
8. Includes $72,000 preauthorization costs and excludes 
contributed funds $138,189. 
9. Includes $6,120 for jetty condition surveys for FY 87. 
34-8 
Completed 
Completed 
Inactive 
Completed 
Completed 
Completed 
Completed 
1966 
1979 
1935 
1971 
1974 
1976 
976 
155,5502 
505,2013 
1,108,1824 
180,4726 
848,2277 
210,3908 
6,1209 
85,8805 
- - - --- I -- - --

SAN FRANCISCO, CA, DISTRICT 
TABLE 34-D OTHER AUTHORIZED BEACH EROSION 
CONTROL PROJECTS 
For Last Cost to Sep 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Humboldt Bay, CA Inactive 1958 2,000 - 
Santa Cruz County, CA Inactive 1966 245,639 - 
TABLE 34-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report For Deauthorized Expended Expended 
Knights Valley Lake, R.R. Basin, 
CA 1974 Aug. 5, 1977 
Oakland Harbor, CA (Deepen Tidal 
Canal) 1981 Nov. 6, 1977 
Oakland Harbor, CA (Fruitvale 
Avenue Bridge) 1981 Nov. 6, 1977 
San Lorenzo Creek, CA (Upper 
Portion) 1962 Nov. 6, 1977 
San Pablo Bay and Mare Island 
Strait, CA (Approaches to Vallejo 
and South Vallejo) 1982 Nov. 6, 1977 
34-9

SACRAMENTO, CA, DISTRICT * 
This district comprises basins of Suisun Bay and San 
Joaquin and Sacramento Rivers in California; Goose 
Lake in Oregon; basins of the Great Salt Lake and 
Sevier Lake in Utah; an intervening portion of Great 
Basin in northern Nevada, northern California, and 
southeastern Idaho; and the upper Colorado River 
basin, which is in southwestern Wyoming, eastern 
Utah, northeastern Arizona, and western Colorado, 
west of the Continental Divide. 
IMPROVEMENTS 
Navigation Page 
1. Sacramento River, CA ................. 35-2 
2. Sacramento River Deep Water 
Ship Channel, CA ........................ 35-3 
3. San Francisco Bay to Stockton, CA 
(John F. Baldwin and Stockton 
Ship Channels) .......................... 35-3 
4. San Joaquin River, CA ................. 35-4 
Flood Control 
5. Buchanan Dam-H.V. Eastman Lake, 
Chowchilla River, CA .................. 35-5 
6. Calaveras River and Littlejohn 
Creek and tributaries, including 
New Hogan Lake and Farmington 
Dam, CA .............................. 35-5 
7. Corte Madera Creek, CA ................. 35-6 
8. Fairfield Vicinity Streams, CA ........... 35-7 
9. Hidden Dam-Hensley Lake, Fresno 
River, CA ............................. 35-8 
10. Isabella Lake, Kern River, CA ............ 35-8 
11. Kaweah and Tule Rivers, including 
Terminus Dam and Success Lake, CA ..... 35-9 
12. Little Dell Lake, UT ..................... 35-11 
13. Lower San Joaquin River, CA ........... 35-11 
14. Martis Creek Lake, Martis Creek, 
NV and CA ............................. 35-11 
15. Merced County Streams, CA............. 35-12 
16. Merced County Stream Group, CA ........ 35-12 
17. Pajaro River, CA ......................... 35-13 
18. Pine Flat Lake and Kings River, 
CA ...................................... 35-13 
19. Redbank and Fancher Creeks, CA ........ 35-15 
20. Russian River Basin, including 
Dry Creek (Warm Springs Lake) and 
Lake Mendocino (Coyote Valley 
Dam), CA ............................... 35-15 
21. Sacramento River and tributaries, 
CA from Collinsville to Shasta Dam ....... 35-16 
22. Walnut Creek, CA ..................... 35-18 
23. Wildcat and San Pablo Creeks, CA ........ 35-18 
24. Inspection of Completed Flood 
Control Projects .......................... 35-19 
Flood Control (Cont'd) Page 
25. Flood Control Work under Special 
Authorization ............................ 35-20 
26. Scheduling Flood Control Reservoir 
Operations...............................35-20 
Multiple-Purpose Projects Including Power 
27. New Melones Lake, CA ................... 35-20 
General Investigations 
28. Surveys ................................. 35-21 
29. Collection and Study of Basic Data ........ 35-21 
30. Research and Development ............. 35-22 
31. Preconstruction Engineering and 
Design .................................. 35-22 
32. Other Work under Special Authority ...... 35-22 
Tables 
Table 35-A Cost and Financial 
Statement .................... 35-24 
Table 35-B Authorizing 
Legislation .................. .. 35-30 
Table 35-C Other Authorized 
Navigation Projects .......... 35-32 
Table 35-D Not Applicable 
Table 35-E Other Authorized Flood 
Control Projects ................ 35-33 
Table 35-F Not Applicable 
Table 35-G Deauthorized Projects .......... 35-35 
Table 35-H Sacramento River, CA: 
Tidal and Flood Conditions 
Prevailing ................... 35-25 
Table 35-I San Joaquin River, CA: 
Total Cost of New Work for 
Project ........................ 35-25 
Table 35-J San Joaquin River, CA: 
Project Units (1950 Modification) 
Reclassified and Excluded from 
Project Cost .................. 35-36 
Table 35-K Merced County Stream 
Group, CA, Maximum Inflow, 
Storage, and Outflow for 
Projects.......................35-36 
Table 35-L Russian River Basin, CA: 
Estimated Cost for New Work .. 35-36 
35-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
IMPROVEMENTS (Cont'd) 
Page Tables 
Russian River Basin, CA: 
Project Features and Estimated 
Costs .......................... 35-37 
Sacramento River and 
Tributaries, CA, Collinsville to 
Shasta Dam: Project Units 
Reclassified and Excluded 
from Cost Estimate ......... 35-37 
Sacramento River and 
Tributaries, CA, from 
Table 35-P 
Page 
Collinsville to Shasta Dam: 
Construction Accomplished and 
Contract Costs ............... 35-38 
FIlood Control Work Under 
Special Authorization 
Flood Control Activities 
Pursuant to Section 205, Public 
Law 80-858, as Amended 
(Preauthorization) .............. 35-39 
Navigation 
1. SACRAMENTO RIVER, CA 
Location. Rises in Trinity Mountains in north-central 
California, flows generally southerly about 374 miles 
and empties into Suisun Bay, an arm of San Francisco 
Bay, at Collinsville, CA. (See Geological Survey topographic 
map of Sacramento Valley, CA.) 
Previous projects. For details see page 1985 of 
Annual Report for 1915 and page 1708 of Annual 
Report for 1938. 
Existing project. For description of Sacramento 
Deep Water Ship Channel, see Annual Report for 1969. 
Total first cost for completed portion was $43,932,558 
($39,560,558 Federal (Corps), $300,000 (Coast Guard), 
and $4,072,000 non-Federal for lands and damages, 
including relocations) and excludes local interests cost 
$10,741,000 (June 1963) for 30-foot deep water ship 
channel and 13-foot deep connecting canal basic terminal 
facilities required under terms of project authorization. 
Project also provides for a shallow-draft channel 
10 feet deep at mean lower low water 150 to 200 feet 
bottom width, from Suisun Bay to Sacramento, CA, 60 
miles; a depth of 6 feet at low water between Sacramento 
and Colusa, 85 miles; a depth of 5 feet at low water 
between Colusa and Chico Landing, 50 miles; and such 
depths as practicable between Chico Landing and Red 
Bluff, 53 miles, a total distance of 248 miles. Estimated 
Federal cost (July 1973) of new work for shallow-draft 
river channel is $1,360,000 (includes $1,163,000 for 
deferred portion between Colusa and Chico Landing). 
(See table 35-H on tidal and flood conditions prevailing.) 
Local cooperation. Fully complied with for deep 
water ship channel project. None required on shallowdraft 
feature. 
Terminal facilities. Piers, wharves, and docks at 
Port of Sacramento for shallow-draft navigation are 
open-pile structures with timber decks, some of which 
are designed to meet extreme high waters of flood 
stages. All main wharves at Sacramento have rail 
connections. Three of above facilities are owned by city 
of Sacramento and remainder by private interests; all 
are privately operated. For full description see "Port 
and Terminal Facilities at the Ports of Sacramento, 
Stockton, Pittsburg and Antioch, Calif., 1986." Deep 
water terminal facilities comprise wharves and piers, 
administration and storage buildings, and belt railroad 
facilities. Majority of these facilities are owned and 
operated by Sacramento-Yolo Port District; remainder 
are privately owned and operated. Facilities are considered 
adequate for existing commerce. 
Operations and results during fiscal year. New 
work, Deep Water Ship Channel: None. Maintenance: 
Shallow Draft Channel: Minor maintenance and operation 
activities continued in Sacramento River, Sacramento 
upstream to Colusa. Deep Water Ship Channel: 
Maintenance and operation activities continued. Fiscal 
year costs for major maintenance items consisted of: 
Maintenance dredging on Sacramento River, vicinity of 
Rio Vista by suction dredge continued by contract, 
$1,433,255. Repair of west levee, Sacramento Deep 
Water Ship Channel, was initiated and completed by 
contract, $2,045,706. 
Historical summary. Construction of 7-foot shallowdraft 
channel below Sacramento was initiated in September 
1899 and completed in 1904. Modified 10-foot 
shallow-draft channel up to Sacramento was initiated 
in FY 1928 and completed in 1931. Shallow-draft 
channel above Sacramento was begun in April 1946 but 
new work was discontinued when about 48 percent 
complete. In February 1974, remaining work for shallowdraft 
portion of project, provision of a 5-foot depth 
between Colusa and Chico Landing (50 miles), was 
reclassified as "deferred." Channel is navigable all 
year; however, there is no regular navigation above 
Colusa, 145 miles above river mouth. Construction of 
30-foot deep water ship channel was initiated in July 
1949; improvement dredging by continuing contracts 
resulted in provision of an operational facility for 
oceangoing vessels during June 1963. Bascule bridge 
was completed in April 1960, barge lock in August 
1961, barge canal in November 1961, and entire deep 
water ship channel in June 1970. 
35-2 
Tables 
Table 35-M 
Table 35-N 
Table 35-0 
-"--- I I-~----I

SACRAMENTO, CA, DISTRICT 
2. SACRAMENTO RIVER DEEP 
WATER SHIP CHANNEL, CA 
Location. On the Sacramento River between Collinsville 
and the Port of Sacramento, a distance of about 
43 miles, in the counties of Sacramento, Solano, and 
Yolo, CA. 
Existing project. Project provides for deepening to 
35 feet the Suisun Bay and Sacramento River Deep 
Water Ship Channels from New York Slough to the 
Port of Sacramento, and the Avon to New York Slough 
reach to 35 feet which will be accomplished under the 
San Francisco Bay to Stockton (John F. Baldwin and 
Stockton Ship Channels) project, and widening the 
channel 250 to 350 feet as necessary. 
Selected plan also provides for a water quality 
monitoring program, authority to construct a submerged 
sill, 45 acres of land for establishment of 
wetland habitat, and 156 acres of land for upland 
habitat to mitigate for losses of such habitat. 
Project estimate (October 1987) is $76,500,000 (includes 
an allowance for estimated inflation through the 
construction period) comprising Federal cost (Corps) of 
$41,800,000; Federal cost (Coast Guard) for navigation 
aids $600,000; and non-Federal cost of $34,700,000 for 
lands and damages, relocations, and spoil retention 
dikes, including the cash contribution ($13,770,000) 
that local interests must pay. Existing project was 
adopted by Supplemental Appropriations Act of 1985, 
August 15, 1985 (Public Law 99-88), 99th Cong., 1st 
sess. 
Local cooperation. Local interests, through a public 
body legally authorized and financially capable, must 
give assurances they will furnish lands, easements, 
rights-of-way, and dredged material disposal areas; 
modify or relocate buildings, utilities, roads, and other 
facilities where necessary in the construction of the 
project; and provide retention dikes for dredged material 
disposal area; and pay 25 percent of the costs allocated 
to deep draft navigation during construction, presently 
estimated at $13,770,000. Local interests have agreed to 
make all required payments concurrently with project 
construction. A Local Cooperation Agreement (LCA) 
(sec. 221) was executed June 27, 1986. An LCA 
modification was prepared and is awaiting final action 
by the Assistant Secretary of the Army. Modification 
approval is pending approval of financing plan. 
Terminal facilities. All main wharves at Sacramento 
have rail connections. Three of above facilities are 
owned by city of Sacramento and remainder by private 
interests; all are privately operated. For full description 
see "Port and Terminal Facilities at the Ports of 
Sacramento, Stockton, Pittsburg and Antioch, Calif., 
1986." Deep water terminal facilities comprise wharves 
and piers, administration and storage buildings, and 
belt railroad facilities. Majority of these facilities are 
owned and operated by Sacramento-Yolo Port District; 
remainder are privately owned and operated. Facilities 
are considered adequate for existing commerce. 
Operations and results during fiscal year. General 
Design Memorandum was approved and Record of 
Decision was signed in May 1987. Local Cooperation 
Agreement (LCA) modification was approved and was 
signed by Port of Sacramento on August 19, 1987, but 
final action on LCA modification by Assistant Secretary 
of the Army is dependent upon approval of financing 
plan. 
3. SAN FRANCISCO BAY TO 
STOCKTON, CA (JOHN F. 
BALDWIN AND STOCKTON 
SHIP CHANNELS) 
Location. On navigation channels extending from 
entrance to San Francisco Bay to Port of Stockton 
through San Francisco, Marin, Contra Costa, Solano, 
Sacramento, and San Joaquin Counties. (See Coast and 
Geodetic Charts 5527 and 5532-5534 for respective 
areas.) 
Existing project. Project provides for modification 
of existing San Francisco Harbor, Richmond Harbor, 
San Pablo Bay and Mare Island Strait, Suisun Bay 
Channel, and San Joaquin River navigation projects to 
provide depths of 55 feet for San Francisco Bar Channel, 
45 feet for main internal bay channels upstream to 
vicinity of Avon, and 35 feet from Avon to Stockton; 
enlargement and deepening to 45 feet of maneuvering 
areas adjacent to major petroleum refinery terminals 
along channel route; widening Suisun Bay Channel; 
reclaiming shoreline marshes and inundated or lowlying 
areas by spoil deposit for public recreation and for 
industrial use; providing basic recreation facilities on 
some of the reclaimed areas for public use; and placing 
additional rock revetment on waterside of levees bordering 
channels. 
Project estimate (October 1987) is $170,600,000, 
(includes an allowance for estimated inflation through 
the construction period) comprising Federal cost (Corps) 
of $132,000,000, including basic recreation facilities; 
Federal cost (Coast Guard) for navigation aids 
$1,100,000; and non-Federal cost of $37,600,000 for 
lands and damages, relocations, berthing areas, and 
spoil retention dikes, including the cash contribution 
($250,000) that local interests must make for land 
enhancement at time of construction. Local interests 
must also pay, contribute in kind, or repay with interest 
one-half of separable cost of project allocated to 
recreation. Existing project was adopted by 1965 River 
and Harbor Act (H. Doc. 208, 89th Cong., 1st sess., 
contains latest published map). 
Local cooperation. Local interests, through a public 
body legally authorized and financially capable, must 
give assurances they will furnish lands, easements, and 
rights-of-way for construction and future maintenance 
of the project and for aids to navigation, including spoildisposal 
areas designated by the Chief of Engineers; 
provide necessary spoil retention dikes, bulkheads, and 
embankments except as applicable to spoil-disposal 
35-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
areas designated as public recreation areas; make 
utility modifications and relocations required for construction, 
including new bridges or bridge alterations 
(except for railroad bridges), and absorb any increased 
annual maintenance and operation costs resulting therefrom; 
provide and maintain all necessary berthing 
areas, at a depth commensurate with project depth, at 
all terminals and wharves to be served by the deepened 
channels; and in recognition of the local land enhancement 
benefits to result from landfill during dredging, 
contribute to the United States 4 cents per cubic yard of 
all spoil material placed during initial construction for 
modification of Suisun Bay Channel project on areas not 
developed for public use. Local interests must also give 
satisfactory assurances, before starting construction of 
the affected units, that they will maintain and operate 
the Federally provided recreation areas and facilities, 
continue to maintain to adequate standards the levees 
altered, set back or provided revetment protection, and 
hold the U.S. Government free from damages due to 
deposition of spoil and construction of new levees or 
reconstruction of existing levees. Local interests, represented 
by Board of Supervisors of Contra Costa County 
and Stockton Port District, must, at time of construction, 
contribute $250,000 in cash for land enhancement; pay, 
contribute in kind, or repay with interest one-half of 
separable cost of project allocated to recreation; and 
maintain and operate basic recreation facilities after 
construction and install additional basic facilities 
required as demands on area expand. No work shall be 
undertaken on a modification of Suisun Bay Channel 
project unit to deepen the channel to more than 35 feet 
between Avon and a proposed refinery or manufacturing 
plant, until local interests furnish formal assurances 
and definite plans for such installation within the Avon- 
Chipps Island reach of channel. Also, no work shall be 
undertaken on modification of San Joaquin River navigation 
project unit, regarding access channels in vicinity 
of Antioch, until local interests furnish formal assurances 
and definite plans for Port of as demands on area 
expand. No work shall be undertaken on a modification 
of Suisun Bay Channel project unit to deepen the 
channel to more than 35 feet between Avon and a 
proposed refinery or manufacturing plant, until local 
interests furnish formal assurances and definite plans 
for such installation within the Avon-Chipps Island 
reach of channel. Also, no work shall be undertaken on 
modification of San Joaquin River navigation project 
unit, regarding access channels in vicinity of Antioch, 
until local interests furnish formal assurances and 
definite plans for Port of Antioch. Formal assurances 
for deepening and otherwise improving the Stockton 
Deep Water Ship Channel from Pittsburg to Stockton 
were furnished by Stockton Port District April 9, 1970. 
The Stockton Port District, in August 1980, formally 
provided their intent to sponsor the Avon to Pittsburg 
reach (Suisun Bay Channel) and recreational development 
on Roberts Island. The Port of Sacramento by 
letter of October 20, 1981, stated that they would 
furnish the necessary assurances for fish and wildlife 
mitigation and enhancement, and on April 13, 1982, 
provided formal updated assurances for the Avon to 
Stockton portion. A sec. 221 agreement satisfying all 
requirements of local cooperation for Southampton 
Shoal and Richmond Long Wharf maneuvering area 
was obtained from Contra Costa County Board of 
Supervisors and signed by District Engineer July 31, 
1984. 
Terminal facilities. See Port Series No. 30, revised 
1983, and 31, revised 1982, titled respectively: "The 
Ports of San Francisco, Redwood City, and Humboldt 
Bay, Calif." and "The Ports of Oakland, Alameda, 
Richmond, and Ports on Carquinez Strait, Calif."; and 
Port Series No. 32, revised 1986, "The Ports of Sacramento, 
Stockton, Pittsburg and Antioch, Calif." Facilities 
are considered adequate for existing commerce and 
will be adequate for future commerce upon completion 
of new terminal facilities. 
Operations and results during fiscal year. New 
work: Sacramento District: Engineering continued. 
Channel improvement-dredging of various reaches 
between McDonald Tract and Avon was continued by 
Contract No. 4 at fiscal year contract cost of $503,325. 
Channel improvement dredging of New York Slough to 
Middle Point was initiated by Contract No. 5 and 
completed at a fiscal year contract cost of $1,318,849. 
San Francisco District: Continued planning activities. 
Channel improvement: A second dredging contract for 
Richmond Long Wharf Maneuvering Area, Contra 
Costa County, (awarded in September 1986) was 
initiated and completed at fiscal year cost of $358,148. 
Historical summary. Construction of project was 
initiated in June 1971 and is about 35 percent complete. 
4. SAN JOAQUIN RIVER, CA 
Location. Rises in east central California and flows 
westerly and northwesterly about 340 miles to its 
confluence with Sacramento River at head of Suisun 
Bay, 48 miles northeast of San Francisco. Deep water 
channel in San Joaquin River extends 41 miles from its 
mouth in Suisun Bay at Pittsburg to city of Stockton. 
Waterborne access to city provided by Stockton Channel, 
an artificial cut extending from river about 2 miles into 
city. (See Coast and Geodetic Survey Sheet 5527.) 
Existing project. For description of completed 
improvement, modifications, and authorizing acts, see 
Annual Report for 1967. (See table 35-I for total cost of 
new work for project completed in May 1960.) 
Projects units (1950 modification) reclassifed and 
excluded from project cost are set forth in table 35-J. 
Modification of existing project is included as one 
unit of San Francisco Bay to Stockton, CA, (John F. 
Baldwin and Stockton Ship Channels) project, authorized 
by 1965 River and Harbor Act (H. Doc. 209, 89th 
Cong., 1st sess.); this modification is reported in detail 
under Sacramento District, Improvement No. 3. 
Local cooperation. Fully complied with for completed 
portion of project; for details of required cash contribu- 
35-4

SACRAMENTO, CA, DISTRICT 
tions on completed, inactive and deferred portions of 
project, see Existing project paragraph, Annual Report 
for 1967. 
Terminal facilities. For description of harbor facilities 
at Port of Stockton, CA, see Port Series 32, "The 
Ports of Sacramento, Stockton, Pittsburg and Antioch, 
Calif.," revised 1986. Downstream from Stockton, traffic 
is accommodated by bank landings and sheds except at 
Antioch and near Pittsburg, where there are wharves 
for shallow- and deep-draft vessels. Terminal transfer 
facilities at public ocean terminal of Port of Stockton 
are adequate for present and immediate future. 
Operations and results during fiscal year. Maintenance: 
Condition studies and miscellaneous inspections 
and reports were accomplished by hired labor. Dredging 
of settling basin by suction dredge, Stockton Deep 
Water Ship Channel, San Joaquin River, was initiated 
at fiscal year contract cost of $682,615. (Repair or 
restoration of wavewash protection is required by 
legislation authorized by Improvement No. 3.) 
Historical summary. Active portion of existing project 
was completed in May 1960. Construction of project 
was initiated in December 1877. 
Flood Control 
5. BUCHANAN DAM-H. V. EASTMAN 
LAKE, CHOWCHILLA RIVER, CA 
Location. On Chowchilla River about 36 miles above 
its mouth and about 16 miles northeast of city of 
Chowchilla, CA. (See Geological Survey quadrangles 
for area.) 
Existing project. Provides for construction of a 205- 
foot high rockfill dam to create a reservoir with gross 
storage capacity of 150,000 acre-feet for flood control, 
irrigation, recreation, and fish and wildlife. In conjunction 
with dam, project plan provides for about 12 miles 
of downstream levee and channel construction on Ash 
Slough to accommodate a project design flow of 5,000 
cubic feet per second within slough and 7 miles of levee 
and channel improvement on Berenda Slough. Operation 
and maintenance of dam and reservoir is the responsibility 
of the Federal Government. Total first cost for 
existing project is $28,919,597, of which $27,369,597 is 
Federal cost, including $4,580,000 for basic recreation 
facilities, and $1,550,000 non-Federal costs for lands 
and damages, including relocations for downstream 
levee and channel improvements. Local interests have 
contracted with the Bureau of Reclamation for irrigation 
service. For future non-Federal reimbursement, 
see Local cooperation paragraph. 
Local interests have also, over a period of years, 
expended about $500,000 for construction of low levees 
and clearing downstream channels to provide some 
local flood protection in project area. This work is 
inadequate during major floods. Existing project was 
adopted by 1962 Flood Control Act (S. Doc. 98, 87th 
Cong., 2d sess., contains latest published map). Lake 
formed by Buchanan Dam on Chowchilla River was 
designated "H. V. Eastman Lake" by Public Law 
93-217. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New 
work: None. Maintenance: Maintenance and operation 
activities were continued. Dam safety assurance studies 
were continued at a fiscal year cost of $142,410. Runoff 
of Chowchilla River above Buchanan Dam was below 
normal for the year. Maximum storage of 101,200 acrefeet 
occurred April 26, 1987. Maximum estimated 
inflow to reservoir was 1,100 cubic feet per second on 
February 13, 1987. Maximum release of 660 cubic feet 
per second on August 3, 1987, was below maximum 
permissible flood release. During the year, a total of 
73,900 acre-feet of water was released for irrigation and 
other purposes. 
Historical summary. Construction began in July 
1971 and was completed in May 1979. Construction of 
Buchanan and Hidden dam and appurtenances were 
combined under one contract. Project was completed in 
September 1983, except for installation of piezometers 
(now deferred indefinitely). Dam closure was in March 
1975; dam was completed in January 1976. Reservoir 
clearing and boundary marking were completed May 
1975. Bifurcation structure was completed in February 
1976. Channel improvement, Ash and Berenda Sloughs, 
was completed in March 1976. Recreation areas: Phase 
I was completed in January 1976; Phase II was completed 
in February 1978. Residences, administration 
building, and visitors center contract was completed in 
May 1978. Landscaping was completed in May 1979 
and erosion control was completed in April 1979. A 
resources interpretive display and road relocation were 
completed in FY 1982. Dam safety assurance studies 
were initiated in FY 1981. Solar heating was installed 
at Chowchilla recreation area in FY 1984. Final land 
audit was approved on December 3, 1985. 
6. CALAVERAS RIVER AND 
LITTLEJOHN CREEK AND 
TRIBUTARIES, INCLUDING 
NEW HOGAN LAKE AND 
FARMINGTON DAM, CA 
Location. Streams comprising Calaveras River and 
Littlejohn Creek groups rise in Sierra Nevada and its 
foothills, flow easterly across flatlands of San Joaquin 
Valley and empty into San Joaquin River directly, or 
through various sloughs, in vicinity of Stockton, CA. 
Littlejohn Creek is in Calaveras, Stanislaus, and San 
Joaquin Counties. The three principal stream systems 
of the group are, from south to north, Lone Tree Creek, 
Littlejohn Creek, and Duck Creek. Calaveras River 
group is in Calaveras and San Joaquin Counties. The 
two principal streams of the groups are, from south to 
north, Calaveras River and Bear Creek. (See Geological 
Survey Valley Springs quadrangle for New Hogan 
35-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
reservoir area and Trigo and Bachelor Valley quadrangles 
for Farmington reservoir area.) 
Existing project. For description of completed 
improvements consisting of Farmington Dam, New 
Hogan Lake, and Bear Creek levee and channel improvement, 
and authorizing act, see Annual Report for 1967. 
(a) Farmington: Total first cost (July 1955) for project 
was $3,995,684, of which $3,676,384 was Federal and 
$319,300 non-Federal for lands and damages including 
relocations. (b) New Hogan: Federal cost for project is 
$15,906,150, including $543,514 for basic recreation 
facilities. For future non-Federal reimbursement, see 
Local cooperation paragraph. Federal cost for recreation 
facilities funded from Code 710 appropriations is 
$897,742. (c) Bear Creek: Project cost is $6,485,734, of 
which $3,242,867 is Federal, including reimbursement 
($488,096) to local interests of one-half of excess local 
interest cost of lands, rights-of-way, and relocations 
over estimated Federal construction cost in accordance 
with section 3, Public Law 738, 74th Congress. Non- 
Federal cost included in above amount is $3,242,867 for 
relocations and lands and damages, exclusive of above 
Federal reimbursement. 
Local cooperation. Fully complied with. New Hogan: 
Local interests must pay portion of first cost and annual 
operation and maintenance costs allocated to conservation 
functions of project. These costs are estimated at 
36.2 percent of first cost and 38 percent of annual costs. 
In addition, local interests contributed land, the (July 
1964) market value of which was $556,000. For years 
1961 through 1970, an interim contract between the 
Bureau of Reclamation and local water users provided 
for storage and payment of irrigation water; local 
interests paid $2,915,102 through December 31, 1986. 
A long-term contract between that agency and local 
water users was executed August 25, 1970. A concessionaire 
at New Hogan Marina provided public use 
facilities in accordance with lease agreement with the 
Secretary of the Army at an estimated cost to date of 
$234,000. 
Operations and results during fiscal year. New 
work: New Hogan Lake, regular funds: None. Code 710 
funds: None. Bear Creek, San Joaquin County: None. 
Maintenance: Farmington Dam-Maintenance and 
operation activities continued; structures were maintained 
in serviceable condition. During the rainflood 
season, maximum flow of Littlejohn Creek at Farmington 
was 1,400 cubic feet per second March 6, 1987. 
Maximum storage in reservoir was 6,300 acre-feet on 
March 6, 1987, and maximum inflow to reservoir was 
7,500 cubic feet per second on March 5,1987. Maximum 
release of 990 cubic feet per second on March 6, 1987, 
was below maximum permissible flood release. New 
Hogan Lake-Maintenance and operation activities 
continued. Modification of water treatment plant was 
initiated at a fiscal year contract cost of $157,923 and 
renovation of recreational area was initiated at a fiscal 
year contract cost of $393,786. Structures were maintained 
in serviceable condition. Runoff of Calaveras 
River above New Hogan was below normal for the year. 
Maximum storage of 144,200 acre-feet occurred April 5, 
1987. Maximum estimated inflow to reservoir was 
3,400 cubic feet per second on March 6, 1987. Maximum 
release of 320 cubic feet per second on August 6, 1987, 
was below maximum permissible flood release. During 
the year, 99,300 acre-feet was released for irrigation 
and other purposes. 
Historical summary. Farmington Dam: Construction 
of Farmington project was initiated in July 1949 and 
completed for beneficial flood control operation in 1952. 
Duck Creek channel improvement was completed in 
November 1951; and channel improvement on south 
Littlejohn Creek was completed in May 1955. There are 
no recreation facilities or public-use areas. All work 
completed. Dam safety assurance studies were initiated 
in FY 1982. New Hogan Lake: Construction was initiated 
May 1960, main dam closure November 1963, project 
completed for operational use in June 1964, and all 
work completed October 1973. Recreation facilities 
have been provided from Code 710 appropriations. 
Seepage measurement weir constructed in June 1980. 
Dam safety assurance studies were initiated in FY 
1980. Bear Creek, San Joaquin County: Construction 
began in June 1963 and was completed in June 1967. 
Final cash contribution was made to local interests 
December 23, 1970. Solar heating was installed at 
recreation facilities in FY 1984. A cultural resources 
survey was completed in FY 1984. 
7. CORTE MADERA CREEK, CA 
Location. Creek and tributaries drain an area of 28 
square miles in Marin County, CA, and discharge into 
west side of San Francisco Bay at a point about 9 miles 
north of Golden Gate. (See Geological Survey quadrangle 
San Rafael.) 
Existing project. Provides for about 11 miles of 
channel improvements, including realignment, enlargement, 
levees, riprapping, rectangular concrete sections, 
interior drainage facilities, bridge relocations, and 
debris removal on Corte Madera Creek and lower 
reaches of its tributaries, and a continuous channel 
rights-of-way to deep water in San Francisco Bay 
reserved to assure channel outlet in the event of future 
tideland reclamation. Approved estimated cost for new 
work (October 1987) is $25,300,000, of which $14,400,000 
is Federal cost and $10,900,000 is non-Federal cost 
(includes $730,000 to be contributed by local interests.) 
(See table 34-B for authorizing legislation.) 
Local cooperation. Local interests must provide 
lands and rights-of-way, including suitable areas for 
disposalof waste material, modify or relocate all bridges 
and utilities necessary for construction and maintenance; 
hold and save the United States free from damages due 
to the construction works; maintain and operate the 
project after completion in accordance with the regulations 
prescribed by the Secretary of the Army, and 
35-6

SACRAMENTO, CA, DISTRICT 
prevent encroachment on flood channels that would 
result in decreasing the effectiveness of project for flood 
control; adjust all claims regarding water rights that 
might be affected by the project; and contribute in cash 
1.5 percent of Federal construction cost of Ross Valley 
unit and tidal areas, an estimated $730,000. Marin 
County Flood Control and Water Conservation District 
previously furnished resolution of local assurances 
dated March 29, 1966, March 28, 1967, August 15, 1967, 
and July 8, 1969, and Marin County Board of Supervisors 
reaffirmed by letter dated September 28, 1978. Project 
was authorized by the State of California by 1965 
Statute, Chapter 1388. Board of Supervisors of Marin 
County Flood Control and Water Conservation District 
furnished assurances of willingness and ability to meet 
requirements for portion of project below Sir Francis 
Drake Boulevard. Acquisition of rights-of-way and 
dredge material disposal areas, relocations and construction 
for remaining work is being held in abeyance 
as a result of a request from Congress for a review of 
alternatives other than completing the project as an 
open concrete channel. 
On December 13, 1983, Marin County Board of 
Supervisors reconfirmed assurances of local cooperation 
because a Superior Court Judgment ordered that county 
to take all steps required by law to complete channel 
downstream of Sir Francis Drake Boulevard (Unit 4) 
and maintain entire project as agreed. A Local Cooperation 
Agreement for redredging the lower reach of Corte 
Madera Creek was executed on June 29, 1985. Marin 
County also provided support for Ross Valley Unit 4 by 
resolution on March 24, 1987. 
Operations and results during fiscal year. New 
work: Redredging Lower Corte Madera Creek channel 
was completed at fiscal year contract cost of $1,479,664, 
and was transferred to local interests by letter of May 
28, 1987. San Francisco District will monitor maintenance 
and operation of the project. 
Historical summary. Project responsibility was 
transferred from San Francisco District on April 1, 
1982. Project is about 75 percent complete considering 
the portion being held in abeyance upstream of Sir 
Frances Drake Boulevard. Work remaining: Design 
construction of the remaining 3,000 feet of channel 
downstream of Sir Francis Drake Boulevard and Ross 
Creek. In lieu of the authorized concrete channel, an 
alternative plan consisting of wing walls and individual 
house floodproofing is being recommended in the Significant 
Post-Authorization Change Report. The portion 
of Corte Madera Creek upstream of intersection of Sir 
Francis Drake Boulevard and Corte Madera Creek in 
Ross, near the city of San Anselmo, was classified as 
"inactive" on July 11, 1984, due to lack of local support. 
A Local Cooperation Agreement for redredging lower 
reach of Corte Madera Creek was executed June 29, 
1985. Construction on Lower Corte Madera Creek 
Channel was completed and transferred to Marin County 
Flood Control and Water Conservation District by 
letter of May 28, 1987. San Francisco District will 
monitor maintenance and operation of the project. 
8. FAIRFIELD VICINITY 
STREAMS, CA 
Location. On five streams in vicinity of cities of 
Fairfield and Suisun, Solano County, CA. 
Existing project. Provides for channel improvement 
on Ledgewood, Laurel, and McCoy Creeks and diversion 
of three creeks upstream from Fairfield (Pennsylvania 
Avenue Creek into Ledgewood Creek, Union Avenue 
Creek into Laurel Creek, and Laurel Creek into McCoy 
Creek). Project related recreation facilities such as 
access roads, parking areas, a boat-launching ramp and 
hiking, bicycle, and horseback trails would also be 
constructed. Estimated cost (October 1987) for existing 
project is $27,800,000 (includes an allowance for 
estimated inflation through the construction period), of 
which $11,000,000 is Federal and $16,800,000 is non- 
Federal. For future non-Federal reimbursement, see 
Local cooperation paragraph. Existing project was 
adopted by sec. 201, 1965 Flood Control Act (1970 
Senate and House Public Works Committee resolutions) 
and Further Continuing Appropriations Act for FY 
1986 (Public Law 99-190), December 19, 1985. (HD 91- 
159, 91st Cong., 1st sess., contains published map). 
Local cooperation. Local interests are required to 
provide lands, easements, rights-of-way, and dredged 
material disposal areas, modify or relocate buildings, 
utilities, roads, and other facilities, except railroad 
bridges, where necessary in the construction of the 
project, pay one-half of the separable costs allocated to 
recreation, presently estimated at $370,000, of which 
$120,000 is for lands, $105,000 is credit for recreation 
facilities built by local interests per PL100-71, July 11, 
1987, which directs that project proceed under provisions 
of sec. 117, PL99-190, and $145,000 is cash 
contribution; and bear all costs of operation, maintenance, 
and replacement of recreation facilities and 
flood control facilities. Ultimate non-Federal cost for 
flood control will be reduced by a Federal reimbursement 
of one-half of the non-Federal costs in excess of the 
Federal construction costs. Local interests have agreed 
to make all required payments concurrently with project 
construction. 
Project had been in "deferred" status since September 
15, 1977, due to lack of local assurances. In April 1982, 
the cities of Fairfield and Suisun affirmed their support 
and intent to provide necessary assurances of local 
cooperation for a modified version of the authorized 
project from 200-year to 100-year flood protection. On 
June 23, 1982, project was reclassified from "deferred" 
to "active" status. The State of California Reclamation 
Board has provided a letter of intent to the Assistant 
Secretary of the Army, November 8, 1982, to cooperate 
with the Federal Government to begin construction of 
the project. In accordance with FY 1985 Supplemental 
Appropriations Act (Public Law 99-88) and sec. 117 of 
the Further Continuing Appropriations Act for FY 
1986 (Public Law 99-190), a Local Cooperation Agreement 
for flood control and recreation (sec. 221) was 
executed June 3, 1986. 
35-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Sec. 117 of Further Continuing Appropriations Act 
for FY 1986 contained the following authorization 
language which will be reflected in any future modified 
agreements: "The Secretary shall include as part of the 
non-Federal contribution of the project for flood control, 
Fairfield Vicinity Streams, California, authorized in 
accordance with sec. 201 of Flood Control Act of 1965, 
the cost of any work carried out by non-Federal interests 
on the project after December 31, 1973, and before the 
date of the enactment of th s joint resolution if the 
Secretary determines such work is reasonably compatible 
with the project. Costs and benefits resulting 
from such work shall continue to be included for 
purposes of determining economic feasibility of the 
project." Prior local expenditures of $6,800,000 have 
been reported by the sponsor. The Corps is evaluating 
costs and benefits of all completed works by non- 
Federal interests after December 31, 1973. 
Operations and results during fiscal year. Construction 
contract for McCoy Creek and Laurel Creek 
Diversion Channel, Phase I, was completed at a fiscal 
year contract cost of $569,183 and was transferred to 
local interests (California State Reclamation Board, 
and Cities of Fairfield and Suisun) on July 17, 1987 for 
maintenance. 
Historical summary. Local Cooperation Agreement 
was executed on June 3, 1986. Construction contract for 
enlarging McCoy Creek and constructing Laurel Creek 
Diversion Channel, Phase I, was completed and was 
transferred to local interests in July 1987 for maintenance. 
9. HIDDEN DAM-HENSLEY LAKE, 
FRESNO RIVER, CA 
Location. On Fresno River about 50 miles above its 
mouth and about 15 miles northeast of Madera, CA (See 
Geological Survey quadrangles for area.) 
Existing project. Provides for construction of a 163- 
foot high earthfill dam to create a reservoir with gross 
storage capacity of 90,000 acre-feet for flood control, 
irrigation, recreation and other purposes. In conjunction 
with the dam, the project provides for about 13 miles of 
downstream levee and channel improvements on Fresno 
River immediately upstream of Chowchilla Canal crossing 
to accommodate project design flow of 5,000 cubic 
feet per second. Operation and maintenance of dam and 
reservoir is the responsibility of the Federal Government. 
Total first cost for existing project is $31,785,426, 
of which $30,555,426 is Federal cost, including 
$3,564,168 for basic recreation facilities, and estimated 
$1,230,000 non-Federal cost for lands and damages 
including relocations for downstream levee and channel 
improvements. Local interests have contracted with the 
Bureau of Reclamation for irrigation service. For 
future non-Federal reimbursement, see Local cooperation 
paragraph. Local interests have also, over a period 
of years, expended about $300,000 for construction of 
low levees and clearing downstream channels to provide 
some local flood protection in the project area. This 
work is inadequate during major floods. Existing project 
was adopted by 1962 Flood Control Act (S. Doc. 37, 87th 
Cong., 1st sess., contains latest published map). Lake 
created by Hidden Reservoir project on Fresno River 
was designated "Hensley Lake" by Public Law 93-603. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New 
work. None. Maintenance: Maintenance and operation 
activities were continued. Dam safety assurance studies 
were continued at a fiscal year cost of $94,415. Erosion 
repair on downstream face of the dam was completed. 
Runoff of Fresno River below Hidden Dam was below 
normal for the year. Maximum storage of 30,100 acrefeet 
occurred June 6, 1987. Inflow to the reservoir and 
outflow was negligible. Maximum release of 230 cubic 
feet per second on June 28, 1987, was below maximum 
permissible flood release. During the year, 28,900 acrefeet 
of water was released for irrigation and other 
purposes. 
Historical summary. Construction began in July 
1971 and was completed in January 1979. Dam closure 
was in March 1975; dam was completed November 
1975. Instrumentation was completed in January 1976. 
Downstream channel improvement, Fresno River, was 
completed April 1976. Recreation areas: Phase I was 
completed in March 1976; Phase II was completed in 
June 1978. Residences, administration building, grounds, 
and utilities contract was completed in February 1978. 
Landscaping was completed in December 1978 and 
erosion control was completed in January 1979. Project 
was completed in September 1980. Final land audit was 
approved February 5, 1980. Dam safety assurance 
studies were initiated in FY 1980. Piezometer installation 
was completed in September 1982. Solar heating 
was installed at recreation areas in FY 1984. 
10. ISABELLA LAKE, KERN RIVER, 
CA 
Location. About 35 miles northeast of city of Bakersfield, 
CA, near confluence of north and south forks of 
Kern River; auxiliary dam is about one-half mile east of 
main dam. (See Geological Survey quadrangles of 
area.) 
Existing project. For description of completed 
improvement and authorizing act, see Annual Report 
for 1967. Federal cost for new work is $22,027,452. For 
future non-Federal reimbursement see Local cooperation 
and Licenses paragraphs. Federal cost funded 
from Code 710 appropriations is $2,199,085. Operation 
and maintenance of dam and reservoir is Federal 
responsibility. 
Local cooperation. California officially adopted project 
by chapter 1514 of statutes of 1945, State of California. 
Local interests, represented by North Kern, Buena 
Vista, and Tulare Lake Basin Water Storage Districts 
and La Hacienda Water District, were required to 
reimburse the Federal Government the portion of first 
cost and annual operation and maintenance costs allo- 
35-8

SACRAMENTO, CA, DISTRICT 
cated to irrigation functions of project. These costs, 
based on a cost allocation study completed in December 
1955, are $4,573,000 of first cost and 21.7 percent of 
annual operation and maintenance cost. For the years 
1956 through 1964, an interim contract between the 
Bureau of Reclamation and local water users provided 
for storage and payment of irrigation water. Under 
provisions of this interim contract, local interests paid 
$1,936,229 through December 31, 1964. A long-term 
contract between the Bureau and local water users was 
executed October 23, 1964. Balance due on allocated 
first cost of $4,573,000 was paid by the water users on 
March 31, 1965. Kern County assumed administration 
of recreation and development and maintenance of 
public use areas at project in accordance with a 25-year 
license February 15, 1955. The agreement with Kern 
County provided for joint operation and development by 
the Corps and Kern County including permits granted 
to concessionaires by the county to provide certain 
services. As of September 30, 1971, Kern County relinquished 
all administration of recreation and development 
and maintenance of public use areas at the 
project. A State law permitting the Department of 
Boating and Waterways (known as the Department of 
Navigation and Ocean Development prior to January 
1979) to participate in inland water development with 
Federal agencies was signed by the Governor on 
August 11, 1972. All concessionaires will operate under 
permits granted by the Corps. Total cost to date of 
present recreation facilities developed by the county 
and the marina concessionaires is about $965,000; 
$235,000 of this was a grant from the California 
Wildlife Conservation Board and about $534,000 is 
investment by marina concessionaires. 
Licenses. In accordance with Federal Power Commission 
Docket No. E-6578, issued April 1, 1963, payment 
of $377,426 was made to the Federal Government by 
Pacific Gas and Electric Co. ($108,352) and Southern 
California Edison Co. ($269,074) for headwater benefits 
to downstream existing plants from Isabella Dam to 
cover benefits from April 15, 1954, to December 31, 
1962. Between 1962 and 1982 the power companies have 
in the aggregate made annual payments of $44,650 for 
headwater benefits. That amount was to be paid each 
year until changes in operation, development, or costs 
indicated some modification to be advisable. Federal 
Power Commission Docket No. E-6578 was revised by 
Docket No. HB07-75-4-000 (order issued July 11, 1983 
under 24 FERC, paragraph 62052) which modified 
cumulative use charges after 1974, effdctive retroactively. 
Such charges will now vary each year. An 
adjustment (years 1974 through 1984) was included in 
1984 payment of $244,790. The 1985 payment was 
$52,747; 1986 payment was $51,905. No payment was 
received in 1987. Cumulative use charges collected by 
the Federal Power Commission (known as the Federal 
Energy Regulatory Commission since January 9, 1978) 
and returned to the U. S. Treasury through period 
ending September 30, 1986, amounted to $1,709,168. 
Operations and results during fiscal year. New 
work, regular funds: None. Code 710 funds: None. 
Maintenance: Maintenance and operation continued. 
Fiscal year contract costs for major items of work 
included continuation of Eastside recreation area renovation, 
$2,099,195. Dam safety assurance studies at 
Isabella Dam were continued at a fiscal year cost of 
$78,107. Structures were maintained in good condition. 
Runoff of Kern River above Isabella Dam was below 
normal for the year. Maximum storage of 327,000 acrefeet 
occurred October 1, 1986. Maximum estimated 
inflow to the reservoir was 2,400 cubic feet per second 
on February 13, 1987, and maximum outflow of 4,410 
cubic feet per second occurred July 16, 1987. During 
the year, 533,900 acre-feet was released for irrigation. 
Historical summary. Construction began in March 
1948 and was completed in June 1968. Main dam, Borel 
Canal outlet works and appurtenances, and auxiliary 
dam were completed in April 1953. Storage impoundment 
began December 1952. Piezometer was installed 
in August 1982. Project is operating to provide flood 
protection and irrigation benefits for which it was 
designed. Recreation facilities were provided by Code 
710 funds. Dam safety assurance studies were initiated 
in FY 1979. A cultural resources survey was completed 
in FY 1984. 
11. KAWEAH AND TULE RIVERS, 
INCLUDING TERMINUS DAM 
AND SUCCESS LAKE. CA 
Location. Terminus Dam is on Kaweah River about 
20 miles east of Visalia, CA. Success Lake is on Tule 
River about 5 miles east of Porterville, CA. (See Geological 
Survey quadrangles of area.) 
Existing project. Terminus Dam: For description of 
completed improvement and authorizing act, see Annual 
Report for 1975. Federal cost of new work is $19,302,957, 
including $242,605 for basic recreation facilities and 
excluding spreading works constructed by local interests 
at an estimated (July 1957) cost of about $750,000. 
Spreading works portion of project has been deauthorized. 
The 90-day Congressional project review period, 
required by sec. 12, Public Law 93-251, as amended, 
ended August 5, 1977, and resulted in deauthorization 
of that portion of project. Federal cost of recreation 
facilities funded from Code 710 appropriations is 
$700,004. Success Lake: For description of completion 
improvement and authorizing act, see Annual Report 
for 1975. Federal cost of new work for Success Lake is 
$14,247,221, including $253,697 for basic recreation 
facilities. Federal cost of recreation facilities funded 
from Code 710 appropriations is $747,048. For future 
non-Federal reimbursements, see Local cooperation 
paragraph. Operation and maintenance of reservoirs is 
Federal responsibility. 
Local cooperation. California officially adopted projects 
by chapter 1514 of statutes of 1945, State of 
California. Local interests for Terminus Dam are represented 
by Kaweah Delta Water Conservation District. 
35-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Local interests for Success Lake are considered to be 
represented by the Vandalia, Porterville, and Lower 
Tule River Irrigation Districts, the Tulare Lake Basin 
Water Storage District, and Pioneer Water Co., which 
represent over 90 percent of irrigated land and waterright 
holders along Tule River below damsite. Local 
interests must reimburse the Federal Government the 
portion of first cost and annual operation and maintenance 
costs allocated to irrigation functions of projects. 
These costs are estimated at 14.1 percent of first and 
annual costs for Terminus and 9.5 percent of first and 
annual costs for Success. Local interests for Terminus 
stated they will continue to operate and maintain 
spreading, works and downstream channel systems to 
provide required capacity for disposal of floodwaters. 
Local interests for Success stated they will continue to 
maintain downstream channel systems to provide 
required capacity for disposal of floodwaters. Repayment 
contracts between the Bureau of Reclamation and 
local water users for irrigation supply from Terminus 
and Success reservoirs were executed January 11, 1965, 
and April 30, 1965, respectively. Reservoirs are being 
operated for irrigation storage as well as flood control 
and incidental recreation use. Tulare County acquired 
water for recreation pools at the projects. Local interests 
paid the following total amounts for irrigation services 
from the reservoirs through December 31, 1986: 
Terminus, $1,674,706 and Success, $782,235. Tulare 
County was granted a 25-year license for planning, 
development, and management of public recreation 
areas at Success, July 10, 1960, and at Terminus, June 5, 
1961. Basic public-use facilities constructed by Corps at 
the Success reservoir were transferred to jurisdiction of 
Tulare County on January 18, 1962; facilities at 
Terminus were transferred June 20, 1962. In March 
1967, an amendment to the license agreements was 
approved by the Assistant Secretary of the Army. 
Under these amended licenses, Tulare County retained 
administration of only specified land areas and operation 
and maintenance of recreation facilities in these 
areas. In addition, they continued their program of 
water safety, boat inspection, and law enforcement at 
both reservoirs. The Corps took over the administration 
of the remainder of the project land areas and the 
operation and maintenance of recreation facilities in 
these areas. Calif. Department of Fish and Game 
expended funds to improve fishery resources of the 
Terminus reservoir. As of April 1, 1972, Tulare County 
relinquished all planning, development, and management 
of public recreation areas at Terminus Dam. 
Tulare County by expenditure of county funds and by a 
lease to a marina concessionaire has aided in the 
development of recreation facilities at an estimated cost 
of $199,000. Calif. Department of Fish and Game 
expended funds in conjunction with Tulare Sportsman's 
Council, developing a habitat for upland game birds at 
Success Lake. As of April 1, 1972, Tulare County 
relinquished all planning, development, and management 
of public recreation areas at Success Lake, except 
for the Bartlett Park recreation area. Tulare County 
has aided in development of recreation facilities. Total 
cost to date of present recreation facilities developed by 
the county ($360,000) and the marina concessionaires 
($373,000) is about $733,000. 
Operations and results during fiscal year. New 
work: Terminus Dam, regular funds: None. Code 710 
funds: None. 
Success Lake, regular funds, None. Code 710 funds: 
None. 
Maintenance: Terminus Dam: Maintenance and operation 
continued. Dam safety assurance studies were 
continued at a fiscal year cost of $90,022. Structures 
were maintained in serviceable condition. Runoff of 
Kaweah River above Terminus Dam was below normal 
for the year. Maximum storage of 107,400 acre-feet 
occurred on June 4, 1987. Maximum estimated inflow 
to the reservoir on February 13, 1987, was about 3,500 
cubic feet per second. Maximum outflow of 1,500 cubic 
feet per second occurred June 23, 1987. Water released 
for irrigation and spreading releases totaled 185,000 
acre-feet. Success Lake: Maintenance and operation 
continued. Dam safety assurance studies were continued 
at a fiscal year cost of $91,205. Structures were 
maintained in serviceable condition. Runoff of Tule 
River above Success Dam was below normal during the 
year. Maximum estimated inflow to the reservoir was 
2,100 cubic feet per second on February 13, 1987, and 
maximum outflow of 480 cubic feet per second occurred 
on February 15, 1987. Maximum storage of 35,900 
acre-feet occurred on May 12, 1987. Water released for 
irrigation and spreading releases amounted to 70,600 
acre-feet. 
Historical summary. Terminus Dam: Construction 
of project began in July 1957 and was completed in June 
1968. Final land audit was approved on April 20, 1987. 
Construction of main dam and appurtenances, initiated 
in February 1959, was completed in June 1962. Dam 
has been operating since November 1961 to provide 
flood protection for which it was designed; conservation 
impoundment was commenced May 1962. Appurtenances 
are in good condition. Recreation facilities 
were provided by Code 710 funds. Dam safety assurance 
studies were initiated in FY 1979. Piezometer installation 
and a cultural resources survey were completed 
in FY 1984. Success Lake: Construction of project 
began in November 1956, was completed in June 1968, 
and final audit of historical land record was approved 
December 17, 1979. Construction of main dam and 
appurtenances, initiated in October 1958, was completed 
in May 1961. Dam has been operating since October 
1960 to provide flood protection for which it was 
designed; conservation impoundment was commenced 
March 1962. Recreation facilities were provided by 
Code 710 funds. Dam safety assurance studies were 
initiated in FY 1979. A cultural resources survey was 
completed in FY 1984. 
35-10

SACRAMENTO, CA, DISTRICT 
12. LITTLE DELL LAKE, UT 
Location. On Dell Creek, a tributary of Parleys 
Creek, about 8 miles east of Salt Lake City upstream of 
Mountain Dell Reservoir in Salt Lake County, UT. 
Existing project. Project providing for construction 
of a dam about 253 feet high to create a reservoir with a 
gross capacity of 30,000 acre-feet for flood control, 
municipal and industrial water supply, recreation and 
fish and wildlife was authorized by the 1968 Flood 
Control Act (S. Doc. 53, 90th Cong., 1st sess., contains 
published map) as modified by sec. 170, Water Resources 
Development Act of 1976, Public Law 94-587, October 
22, 1976. Facility would be operated in conjunction with 
existing downstream 3,200 acre-foot Mountain Dell 
Reservoir on Parleys Creek for flood control and water 
supply. 
Authorized project has been reexamined and scaled 
down to reflect local interests' ability to pay. Current 
plan of improvement includes only flood control and 
water supply purposes. Recreation was deferred as of 
May 30, 1986, and Emigration Creek Diversion was 
deleted and placed in an inactive status. Project will 
include an earthfill dam 224 feet high, a 20,500 acrefoot 
reservoir, and 10,035 feet of pipeline to divert water 
from Parleys Creek. Estimated project cost (October 
1986) is $57,900,000 (includes an allowance for estimated 
inflation through the construction period) of which 
$33,300,000 is Federal and $24,600,000 is non-Federal 
for lands and damages and includes a cash contribution 
of $18,900,000. Project is included in FY 1985 
Supplemental Appropriations Act (Public Law 99-88), 
August 15, 1985. 
Local cooperation. Local interests are required to 
provide lands, easements, rights-of-way, and dredged 
material disposal areas; modify or relocate buildings, 
utilities, roads, and other facilities where necessary in 
the construction of the project; pay all costs allocated to 
municipal and industrial water supply; bear all costs of 
operation, maintenance, and replacement of flood control 
facilities; and pay a cash contribution presently estimated 
at $18,900,000. By letters of January 22, 1986, 
and January 24, 1986, the Metropolitan Water District 
of Salt Lake City and Salt Lake County indicated their 
support and willingness to proceed with a reduced scale 
project based on their "ability to pay." A Local Cooperation 
Agreement (sec. 221) was executed on June 10, 
1986. Water Revenue Bonds were issued August 27, 
1986, and proceeds from the sale in the amount of 
$14,300,000 have been deposited in the Little Dell 
Construction Fund Account. 
Operations and results during fiscal year. Engineering 
activities included essential completion of the 
Outlet Works Design Memorandum and the Embankment 
and Spillway Design Memorandum, and 
completion of embankment and foundation exploration 
program. Redesign of Highway 65 realignment and 
relocation were functionally completed by the Utah 
Department of Transportation at a fiscal year cost of 
$2,137,036. The dedication ceremony was held on 
September 14, 1987. 
Historical summary. A Local Cooperation Agreement 
(sec. 221) was executed June 10, 1986. 
13. LOWER SAN JOAQUIN RIVER, CA 
Location. On Lower San Joaquin River, CA, from 
city of Stockton, CA, upstream to Friant Dam (about 19 
miles northeast of Fresno). 
Existing project. This project is a modification and 
extension of the previous Lower San Joaquin River and 
Tributaries project (see Annual Report for 1976) to 
provide clearing and snagging on the San Joaquin 
River from Stockton, CA, upstream to Friant Dam. 
Estimated first cost (October 1987) is $6,000,000, of 
which $5,000,000 is Federal and $1,000,000 is non- 
Federal for lands and damages (includes an allowance 
for estimated inflation through the construction period). 
Existing project was included in the 1983 Supplemental 
Appropriations Act, Public Law 98-63, July 29, 1983, 
which states that the project for flood protection on the 
Lower San Joaquin River, CA, authorized by the Flood 
Control Act approved December 22, 1984, as amended, 
is hereby further modified to authorize the Secretary of 
the Army, acting through the Chief cf Engineers, to 
perform clearing and snagging on the San Joaquin 
River from Stockton, CA, to Friant Dam, at an estimated 
cost of $5,000,000. 
Local cooperation. Prior to initiation of construction, 
a non-Federal entity shall furnish adequate assurance 
for providing all lands, easements, rights-of-way and 
utility relocations at no expense to the Federal Government, 
execute a written agreement pursuant to sec. 221 
Public Law 96-611; agree to operate and maintain the 
project works upon completion of construction in accordance 
with rules and regulations prescribed by the 
Department of the Army; and hold and save the United 
States free from damages due to construction, operation, 
and maintenance of the project, not including damages 
due to the fault or negligence of the United States or its 
contractors. 
Operations and results during fiscal year. 
Coordination with local interests and pertinent agencies 
and redraft of a combined General Design Memorandum 
and Environmental Impact Statement were continued. 
Historical summary. A Plan of Action, February 
1984, has been prepared. Design Memorandum No. 5 
for Eastside Bypass at San Joaquin River was prepared 
in September 1984. First construction contract, dredging 
Eastside Bypass, was awarded October 12, 1984 and 
completed in May 1985. 
14. MARTIS CREEK LAKE, MARTIS 
CREEK, NV AND CA 
Location. Reservoir is on Martis Creek a tributary of 
Truckee River, near Truckee, CA; intermittent channel 
35-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
improvements are on Truckee River in Reno, NV. (See 
Geological Survey quadrangles for areas.) 
Existing project. For description of completed 
improvement and authorizing act, see Annual Report 
for 1975. Federal cost for project was $8,503,789 including 
$289,506 for basic recreation facilities. Federal cost 
of recreation facilities funded from Code 710 appropriations 
was $1,200. Construction of recreation facilities 
under Code 710 was determined to be infeasible. Operation 
and maintenance of reservoir is Federal responsibility. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New 
work: None. Maintenance: Maintenance and operation 
of project, including recreation facilities, was continued. 
Drainage control system modification at Martis Creek 
Dam was completed at fiscal year contract cost of 
$150,042. Structures were maintained in serviceable 
condition. Runoff above Martis Creek Dam was below 
normal for the year. Maximum storage of 850 acre-feet 
occurred on February 12, 1987. Inflow to the reservoir 
and outflow was neglible. 
Historical summary. Project construction began in 
August 1967; dam closure was in October 1971; dam 
completed in August 1972; basic recreation facilities 
were completed in December 1972; and project was 
completed in June 1974. Recreation facilities under 
Code 710 funding were considered infeasible. Dam 
safety assurance studies were initiated in FY 1981. 
15. MERCED COUNTY STREAMS, CA 
Location. In vicinity of city of Merced, CA, on 
streams draining from Mariposa County foothills of the 
Sierra Nevada into Merced County. Streams lie easterly 
of and drain into the San Joaquin River between 
Chowchilla River on the south and Merced River on the 
north. Drainage area represents about 1,000 square 
miles; nearly 700 square miles of foothills and mountains 
in Mariposa County and about 300 square miles of flood 
plain in Merced County. (See Geological Survey 
quadrangles for area.) 
Existing project. Project is a modification of Merced 
County Stream Group, Calif., Improvement No. 16, 
authorized by 1944 Flood Control Act (H. Doc. 473, 78th 
Cong., 2d sess.) and completed in FY 1957. Existing 
project provides for construction of three new reservoirs 
- Castle, Haystack Mountain, and Marguerite on 
Canal, Black Rascal, and Deadman-Dutchman Creeks, 
iespectively, and enlargement of four existing reservoirs 
- Burns, Bear, Owens, and Mariposa, providing a total 
capacity of 126,700 acre-feet for multipurpose storage; 
and about 52 miles of levee and channel improvements 
in lower reaches of Bear, Black Rascal, Mariposa, and 
Deadman Creeks, thereby tying the existing project 
channels into Eastside Bypass of San Joaquin River 
flood control system. Haystack Mountain, Bear, and 
Owens projects would provide flood control only; Castle 
and Burns projects, flood control and recreation; 
Marguerite project, flood control and irrigation; and 
Mariposa project, all three purposes. Existing project 
was adopted by 1970 Flood Control Act (Document not 
yet printed.) 
Current plan of improvement would defer enlargement 
of existing Burns reservoir, Mariposa reservoir, 
construction of Marguerite Dam, and the irrigation 
function associated with the latter two facilities, 
enlargement of existing Owens reservoir and about 32 
miles of levee and channel improvement on Owens, 
Mariposa, and Deadman-Dutchman Creeks. Estimated 
project cost (October 1987) is $94,300,000 (includes an 
allowance for estimated inflation through the construction 
period), of which $65,200,000 is Federal and 
$29,100,000 is non-Federal 
Local cooperation. Local interests are required to 
provide lands, easements, and rights-of-way and 
dredged material disposal areas; modify or relocate 
buildings, utilities, roads, and other facilities, where 
necessary in the construction of the project; pay one-half 
of the separable and joint costs allocated to recreation, 
presently estimated at $220,000, of which $180,000 is a 
cash contribution and $40,000 is for lands; and bear all 
costs of operation, maintenance, and replacement of 
flood control facilities. Total non-Federal share of 
Castle Dam first cost is $2,870,000. 
The California Reclamation Board and the City of 
Merced are the local sponsors of the authorized project. 
The Reclamation Board will serve as sole sponsor for 
the Castle Dam Unit. Merced County Board of Supervisors 
reaffirmed their support for the project by letter 
of April 4, 1986. City of Merced by letter of March 13, 
1986, reaffirmed its support for and intent to furnish 
assurances for recreation aspects of the project. 
California Reclamation Board reaffirmed its support 
for total project by letter of April 9, 1986. A Local 
Cooperation Agreement (sec. 221) was executed for 
Castle Dam Unit on June 27, 1986. State of California 
legislation (AB3369) was enacted on September 14, 
1986 which enabled the Reclamation Board to financially 
participate in the project. 
Operations and results during fiscal year. Engineering 
activities continued with initiation of plans and 
specifications for Castle Dam. 
16. MERCED COUNTY STREAM 
GROUP, CA 
Location. Reservoirs and channel improvements are 
on Bear, Burns; Mariposa, and Owens Creeks, in foothills 
of Sierra Nevada about 15 to 20 miles east of city of 
Merced, CA. (See Geological Survey Haystack Mountain 
quadrangle for Burns and Indian Gulch quadrangle for 
Bear, Owens, and Mariposa areas.) 
Existing project. For description of completed 
improvements and authorizing act, see Annual Report 
for 1962. Improvements consist of reservoirs at Mariposa, 
Owens, Burns and Bear Creeks and diversions 
from Black Rascal Creek to Bear Creek and from Creek 
35-12

SACRAMENTO, CA, DISTRICT 
to Mariposa Creek. Total first cost for project was 
$3,899,259, of which $2,751,259 was Federal and 
$1,148,000 non-Federal for lands including relocations 
and channel improvement. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. 
Maintenance: Ordinary maintenance and operation of 
the four completed reservoirs continued. Structures 
were maintained in a serviceable condition. Runoff 
from drainage areas above Merced County stream 
group reservoirs was below normal for the year. (See 
Table 35-K for maximum inflow storage and outflow 
for projects.) Outflows were less than channel capacity 
rates in the project streams. 
Historical summary. Construction was initiated 
March 1948, with construction of Mariposa project, 
which was completed in November 1948. Construction 
of Owens project, initiated in March, was completed in 
October 1949; Burns project, initiated in July 1949, was 
completed in January 1950; and Bear project initiated 
in April, was completed in December 1954. Black 
Rascal and Owens Creek diversion channels and streamgaging 
stations were completed in April 1956. Local 
interests completed channel enlargement and restoration 
of channel capacities of Miles, Burns, Owens, and 
Mariposa Creeks in 1956 at their expense. Improvement 
of Bear Creek and Black Rascal Slough, below their 
confluence, was deferred pending possible improvements 
downstream, outside limits of project. 
17. PAJARO RIVER, CA 
Location. In the Uvas-Carnadero and Llagas Creeks 
watersheds of the upper Pajaro River Basin in south 
Santa Clara County in vicinity of the city of Gilroy about 
75 miles south of San Francisco, CA. 
Existing project. Provides for construction of a 2- 
mile levee along the north side of Uvas Creek from a 
point about 2,000 feet south of Thomas Road to about 
3,500 upstream of Miller Avenue. Project will also 
include a bikeway and hiking trail. Estimated cost 
(October 1987) for existing project is $10,900,000 
(includes an allowance for estimated inflation through 
the construction period), of which $5,395,000 is Federal 
and $5,505,000 is non-Federal (which includes $610,000 
cash contribution). For future non-Federal reimbursement, 
see Local cooperation paragraph. Existing 
project was adopted by Flood Control Act of 1944, 
December 21, 1944 (HD 505-78, 78th Cong., 2d sess., 
contains published map.) 
Local cooperation. Local interests are required to 
provide lands, easements, right-of-way, and dredged 
material disposal areas; modify or relocate buildings, 
utilities, roads, bridges (except railroad bridges) and 
other facilities where necessary in construction of 
project; pay one-half of separable costs allocated to 
recreation and bear all cost of operation, maintenance, 
and replacement of recreation facilities; and pay 5 
percent of cost allocated to flood control and bear all 
costs of operation, maintenance and replacement of 
flood control facilities. Local interests will receive an 
estimated Federal reimbursement of $3,875,000 for one 
half of non-Federal costs allocated to flood control in 
excess of Federal costs. Local interests have agrees to 
make all required payment concurrently with project 
construction. 
Operations and results during fiscal year. Local 
Cooperation Agreements for flood control and recreation 
were executed with the Santa Clara Valley Water 
District in June 1987 and the City of Gilroy in July 1987, 
respectively. First construction contract for levee work 
and bike path upstream of Thomas Road Bridge was 
awarded in September 1987. 
Historical summary. Responsibilty for remaining 
portions of advance engineering and design, plans and 
specifications, and construction was transferred to 
Sacramento District in April 1982. Local Cooperation 
Agreement (LCA) for flood control was executed with 
the Santa Clara Valley Water District on June 25, 1987, 
and LCA for recreation was executed with the City of 
Gilroy on July 27, 1987. 
18. PINE FLAT LAKE AND KINGS 
RIVER, CA 
Location. Reservoir is on Kings River, about 25 miles 
east of Fresno, CA, and channel improvements are on 
Kings River downstream from Lemoore weir, about 25 
miles south of Fresno. (See Geological Survey quadrangles 
of area.) 
Existing project. Improvement is a unit in comprehensive 
plan for flood control and other related purposes 
for Sacramento-San Joaquin Basins. Project consists of 
a 429-foot high concrete gravity dam, including a gated 
overflow section with a maximum discharge capacity of 
391,000 cubic feet per second, creating a reservoir with 
gross storage capacity of 1 million acre-feet, for flood 
control, irrigation, and related purposes. Outlet provisions 
for future power development are included in 
dam, but Federal construction of power-generating 
facilities is not authorized. Improvement also includes 
levee and channel work on Kings River and its distributaries 
on valley floor about 25 miles south of Fresno. 
Channel improvement work will enlarge channel capacities 
and regulate flows in lower branches of the Kings 
River. There are nine public-use and recreation areas: 
One maintained by the Corps, four by the Forest 
Service, three jointly by the Corps and concession, and 
one by Fresno County. Also, five boat access-only areas 
are maintained by the Corps on the south side of the 
reservoir. Project cost is $42,072,330, of which 
$41,502,330 is Federal (including $13,700 for basic 
recreation facilities) and $570,000 non-Federal for 
rights-of-way for downstream channel improvements. 
For future non-Federal reimbursement, see Local 
cooperation paragraph. Federal cost of recreation 
facilities for Pine Flat Lake, funded from Code 710 
appropriations is $1,595,100 exclusive of recreation 
35-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
facilities previously provided at a cost of $13,700. In 
addition, Federal cost of recreation facilities for Pine 
Flat Lake, funded from Public Works Acceleration 
Executive Act of 1962 appropriations, was $239,235 
(July 1963). Operation and maintenance of dam and 
reservoir is Federal responsibility. Existing project 
was adopted by 1944 Flood Control Act (H. Doc. 630, 
76th Cong., 3d sess., contains latest published map). 
Local cooperation. Local interests must reimburse 
the Federal Government for first costs allocated to 
irrigation functions of reservoir portion of project in 
accordance with reclamation law. Under provision of 
War Department Civil Appropriations Act of 1947, the 
Secretary of War, with concurrence of the Secretary of 
the Interior, determined allocation of cost to irrigation 
should be set at an amount not to exceed $14,250,000. In 
addition, local interests must pay 37.4 percent of annual 
maintenance, operation, and replacement costs of dam 
and reservoir allocated to irrigation function. Repayment 
contracts between the Bureau of Reclamation and 
the local water users for the irrigation use of the 
reservoir were executed December 23, 1963. The Bureau 
is administering the contracts in accordance with 
reclamation law as amended by the Reclamation Reform 
Act of October 12, 1982. That act generally exempts the 
limitations under the early reclamation laws as being 
applicable to projects constructed by the Corps with two 
exceptions; however, all existing contracts to share 
construction and maintenance costs remain in effect. 
Prior to execution of the final contracts, the Bureau 
provided conservation water to local interests under an 
interim contract. Irrigation interests paid $12,812,126 
for irrigation services through December 31, 1986. 
With respect to the downstream channel improvements, 
sec. 3, Flood Control Act of June 22, 1936, applies. King 
River Conservation District represents local interests; 
assurances were accepted November 20, 1959. Local 
interests have furnished all requirements for construction 
rights-of-way for construction of channel improvements 
required to date. Three concessionaires-one 
each at Lakeridge Marina (Deer Creek), Pine Flat 
Marina and Trimmer Marina provided public-use facilities 
in accordance with lease agreements with the 
Secretary of the Army. Estimated cost to date of 
facilities installed by these concessionaires is $1,727,000. 
Fresno County developed public-use facilities on an 85- 
acre tract immediately downstream from dam for 
picnicking, camping, swimming, and playground activities, 
at an estimated cost to date of $476,000 under 
provisions of a license agreement. The U.S. Forest 
Service developed and operates a picnic area at the 
upper end of reservoir. Cost of site development is about 
$37,500. Installation of a hydroelectric powerplant, 
located at the downstream toe of the Corps Pine Flat 
Dam, was completed in January 1984 by Kings River 
Conservation District. Project consists of an outdoortype 
powerhouse containing three generating units 
with capacities of 55 megawatts each for a total of 165 
megawatts. Conservation District would make use of 
the three existing 13.5-foot diameter penstocks that 
were installed in Pine Flat Dam when constructed in 
1954. 
Licenses. License No. 1988, effective April 1, 1955, 
was issued by Federal Power Commission to Pacific 
Gas and Electric Co. for hydroelectric power development 
of North Fork Kings River by the company 
upstream from the Pine Flat reservoir. Under interim 
Contract No. DA-04-167-eng-1 182 with the Department 
of the Army, Pacific Gas and Electric Co. paid for 
storage of power water in the Pine Flat reservoir 
May 15, 1954, through March 31, 1955. Current Contract 
No. DA-04-167-eng-1328 with the Department of the 
Army provides for storage of power water at the rate of 
0.1375 per acre-foot; the contract covers April 1, 1955, 
through March 31, 2005. By an agreement of January 
1972, supplementing the December 1954 contract, 
Pacific Gas and Electric Co. transferred ownership of 
most of its Kings River system water to the Kings River 
Water Association. Accordingly, no further significant 
storage service to Pacific Gas and Electric Co. by the 
reservoir at Pine Flat is anticipated. Total payment 
under these contracts through June 30, 1972, (last year 
of payment), amounts to $2,478,798; these funds are 
paid to Sacramento District and deposited for return to 
the Treasury. 
Operations and results during fiscal year. New 
work, regular funds: None. Code 710 funds: None. 
Maintenance: Maintenance and operation activities 
continued. Structures were maintained in serviceable 
condition. Runoff of Kings River above Pine Flat Dam 
was below normal for the year. Maximum storage of 
791,700 acre-feet occurred on May 22, 1987. Maximum 
estimated inflow to the reservoir was 6,600 cubic feet 
per second on February 13,1987, and maximum outflow 
of 7,780 cubic feet per second occurred on July 14, 1987. 
During the year, 1,217,700 acre-feet was released for 
irrigation and spreading. Dam safety assurance studies 
were continued at a fiscal year cost of $57,478. 
Historical summary. Construction began in April 
1947 and project, including channel improvement, was 
completed in September 1977. Main dam was initiated 
in January 1950, completed in June 1954, and has been 
operating since February 1954 to provide flood protection 
for which it was designed. Total of 35.2 miles of new 
and reconstructed levees and 13.2 miles of channel 
clearing have been transferred to the Kings River 
Conservation District for maintenance. Recreation facilities 
for various recreation areas under Code 710 appropriation 
are complete. Completed preliminary design 
and cost estimates for Pine Flat fish barrier were 
reviewed by the State, but the State was unable to 
provide necessary assurances of local cooperation. Dam 
safety assurance studies were initiated in FY 1982. A 
cultural resources survey was completed in FY 1984. 
35-14

SACRAMENTO, CA, DISTRICT 
19. REDBANK AND FANCHER 
CREEKS, CA 
Location. Northeast and adjacent to the Fresno- 
Clovis Metropolitan Area in Fresno County about 170 
miles southeast of Sacramento, CA. 
Existing project. Provides for flood control detention 
basins on Redbank Creek, Pup Creek, and Alluvial 
Drain; construction of a dam 45.5 feet high to create a 
reservoir with gross capacity of 10,300 acre-feet for 
flood control on Fancher Creek; and enlargement of Big 
Dry Creek project to provide increased flood protection 
and recreational development. Since the local sponsor 
does not support recreational development at this time, 
the recreation feature of the project is considered to be 
inactive. The authorization Act states "measures determined 
appropriate by the Secretary of the Army to 
minimize benefits to groundwater recharge" shall be 
included in the project. Estimated cost (October 1987) 
for existing project is $69,600,000 (includes an allowance 
for estimated inflation through the construction period), 
of which $52,200,000 is Federal and $17,400,000 is non- 
Federal (which includes $5,010,000 cash contribution). 
For future non-Federal reimbursement, see Local 
Cooperation paragraph. Existing project was adopted 
by sec. 401, Water Resources Development Act of 1986, 
Public Law 99-662, November 17, 1986. (HD 98-147, 
98th Cong., 2d sess., contains published map.) 
Local cooperation. Local interests are required to 
provide lands, easements, rights-of-way, and dredged 
material disposal areas; modify or relocate buildings, 
utilities, roads, bridges (except railroad bridges) and 
other facilities where necessary in construction of the 
project; pay 7 percent of cost allocated to flood control to 
bring total non-Federal share of flood control costs to 25 
percent, of which $5,010,000 is cash contributed, and 
bear all costs of operation, maintenance and replacement 
of flood control facilities. Local interests have agreed to 
make all required payments concurrently with project 
construction. 
Operations and results during fiscal year. Local 
Cooperation Agreement was executed in August 1987. 
Engineering activities were continued. 
Historical summary. Local Cooperation Agreement 
was executed on August 1, 1987. 
20. RUSSIAN RIVER BASIN, CA 
Location. Russian River rises in Coast Range in 
northwestern California, flows southerly for 87 miles, 
and then turns westerly to flow for 23 miles to Pacific 
Ocean at Jenner, 60 miles northwest of San Francisco, 
CA. (For general location see Geological Survey map 
for California.) 
Existing project. Active authorized project provides 
for construction of a dam on East Fork of Russian River 
at Coyote Valley to a height of 160 feet; a dam on Dry 
Creek at Warm Springs to a height of 319 feet; and 
channel stabilization works on Russian River between 
mouth and mile 98, on lower reaches of several tributaries, 
and on Dry Creek downstream from dam. Coyote 
Valley Dam (Lake Mendocino), completed in 1959, is 
operated and maintained by the United States. (See 
tables 35-L and 35-M for latest approved estimated 
costs.) 
Local cooperation. Fully complied with for Coyote 
Valley Dam and channel improvements accomplished 
to date. For the Dry Creek portion, local interests are 
required by the authorizing act to comply with the 
usual a., b., c. requirements for channel improvements 
and, in addition, prevent any encroachment in the 
channel of Dry Creek which would interfere with 
proper functioning of the channel improvement works; 
adjust all claims concerning water rights arising from 
the construction and operation of the improvements, 
including acquisition of water rights needed for preservation 
of fish and wildlife resources affected by the 
project; and reimburse the United States in accordance 
with the Water Supply Act of 1958, as amended, for that 
part of the construction cost, (27.8% of total construction 
cost, currently estimated at $99,400,000) and the annual 
operation, maintenance, and replacement costs allocated 
to municipal and industrial water supply, tentatively 
estimated at $368,000. The estimated annual cost to 
local interests for maintenance of channel improvement 
works is $77,000. Sonoma County Water Agency (formerly 
Sonoma County Flood Control and Water Conservation 
District) provided assurances of willingness and 
ability to meet requirements by Resolutions No. DR 
00793-1, September 25, 1961, No. DR 4770-1, 
December 17, 1962, and No. DR 45759, August 5, 
1974, for Dry Creek (Warm Springs) Lake and Channel. 
By letter dated March 7, 1967, Sonoma County Flood 
Control and Water Conservation District further indicated 
their interest in optimization of the Dry Creek 
(Warm Springs) damsite to provide additional water 
supply storage. Reimbursement to the United States for 
Dry Creek (Warm Springs) Lake and Channel costs 
allocated to 212,000 acre-feet of water supply storage is 
specified in a water supply contract with the local 
sponsor approved in October 1982. Local interests have 
expended approximately $1,000,000 to provide partial 
flood protection in project area and have constructed 
facilities at an approximate cost of $20,000,000 to 
distribute water from the completed Coyote Valley 
reservoir. 
Operations and results during fiscal year. New 
work: Coyote Valley Dam: None. Dry Creek (Warm 
Springs) Lake and Channel: Engineering activities 
continued. Major items of contract work included: 
Initiation of Rockpile Road Upgrade, $1,157,605; initiation 
of Yorty Creek Beach, $1,235,405; completion of 
administration building modifications and functional 
completion of Buzzard Rock (now known as Liberty 
Glen) camping area, $2,203,771. Maintenance: Coyote 
Valley Dam: Operation and maintenance continued. 
Spillway restoration was continued at fiscal year 
contract cost of $830,343. Structures were maintained 
in serviceable condition. Runoff of East Fork Russian 
35-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
River at Coyote Dam was below normal for the year. 
Maximum storage of 90,200 acre-feet occurred on 
April 7, 1987. Maximum estimated inflow to reservoir 
was 3,300 cubic feet per second on February 12, 1987. 
Maximum release of 1,930 cubic feet per second occurred 
on March 6, 1987. During the year, 24,300 acre-feet 
was released for flood control, and 118,500 acre-feet was 
released for irrigation and other purposes. Dam safety 
assurance studies were continued at fiscal year cost of 
$63,937. Dry Creek (Warm Springs) Lake and Channel: 
Operation and maintenance continued. Structures were 
maintained in serviceable condition. Runoff of Dry 
Creek at Warm Springs Dam was below normal for the 
year. Maximum storage of 213,100 acre-feet occurred 
October 1, 1986. Maximum estimated inflow to reservoir 
was 8,100 cubic feet per second on February 12, 
1987. Maximum release of 1,060 cubic feet per second 
occurred March 17, 1987. During the year, 147,200 
acre-feet was released for irrigation and other purposes. 
Historical summary. Entire project, exclusive of 
recreation facilities at completed project (Lake Mendocino), 
is about 95 percent complete. Coyote Valley Dam, 
initiated November 1958, was completed April 1959 
(cost $17,550,000, of which $11,952,000 was Federal; 
and $5,598,000 contributed). Work, including removal 
of slides resulting from storms in 1958, was completed 
April 1959. Bank stabilization work on Russian River 
near Geyserville was completed in 1957 and channel 
improvements in remaining reaches on Russian River 
and East Fork of Russian River were completed in 1974 
(cost $2,483,900). In April 1982, responsibility was 
transferred to the Sacramento District. 
Warm Springs construction completions include fish 
hatchery in December 1980, reservoir clearing in July 
1981, project overlook in May 1981, downstream stabilization 
sills in October 1981, dam closure in October 
1982, spillway repair at Warm Springs Dam in 
September 1985, and boat launching facilities, Phase I, 
in September 1985. Initial filling of Warm Springs 
reservoir was commenced on November 1, 1984. Major 
items of work remaining include upgrading Rockpile 
Road, minimalrecreation facilities, boat ramp facilities, 
and vegetation management program with remaining 
boundary fencing. Responsibility for construction was 
transferred to Sacramento District in August 1983. 
Dam safety assurance studies were initiated at Coyote 
Valley Dam in fiscal year 1984. 
21. SACRAMENTO RIVER AND 
TRIBUTARIES, CA, FROM 
COLLINSVILLE TO SHASTA DAM 
L ocation. Rises in Trinity Mountains in north-central 
California, flows generally southerly about 374 miles 
and empties into Suisun Bay, an armof San Francisco 
Bay at Collinsville, CA. Works covered by this improvement 
are on Sacramento River and tributaries from 
Collinsville to Shasta Dam, about mile 312. Drainage 
area above Rio Vista is 26,500 square miles (See 
Geological Survey quadrangles of area for Sacramento 
River and Upper Butte Basin; Flournoy and Fruto 
quadrangles for Black Butte Lake; and Tuscan Buttes, 
Tehama, Redding, and Hooker quadrangles for Table 
Mountain Lake.) 
Existing project. Improvement of Sacramento River 
and tributaries, from Collinsville to Shasta Dam was 
authorized as a unit of a comprehensive plan for flood 
control and other related purposes in Sacramento River 
Basin. (a) Sacramento River and major and minor 
tributaries, for flood control purposes: Enlargement of 
existing levees on Sacramento River between vicinity of 
Moulton weir and Ord Bend; construction of new levees 
from present levee terminus to vicinity of Chico Landing; 
construction of a weir near Chico Landing, extension of 
Moulton weir, and construction of a bypass through 
Upper Butte Basin; construction of new levees in Lower 
Butte Basin; enlargement of existing levees in Sutter, 
Tisdale, Sacramento, and Yolo Bypasses; and levee 
construction and/or channel enlargement on following 
minor tributaries of Sacramento River: Antelope Creek; 
Chico and Mud Creeks and Sandy Gulch; Butte and 
Little Chico Creeks; Cherokee Canal; Elder Creek; Deer 
Creek (Tehama County); Thomes Creek; and Willow 
Creek. Improvement provides for about 155 miles of 
channel improvement and about 294 miles of levees 
with an average height of 12 feet and a freeboard of 3 
feet. Improvement also provides for revetment as required 
for protection of bypass levee slopes against 
erosion. Total first cost for project is $18,300,000 
(October 1987), of which $11,900,000 is Federal, and 
$6,400,000 non-Federal for lands and damages, including 
relocations. (See table 35-N on project units classified 
and excluded from cost estimate.) (b) Sacramento 
River, Chico Landing to Red Bluff, CA: An extension of 
the existing Sacramento River Flood Control project 
which provides for construction of bank protection 
works and minor channel improvements as required on 
Sacramento River between Chico Landing and Red 
Bluff for flood control purposes. Estimated first cost 
(October 1987) for project work in Tehama, Butte, and 
Glenn Counties is $31,800,000, of which $30,000,000 is 
Federal cost and $1,800,000 non-Federal cost for lands 
and damages including relocations. (c) Sacramento 
River, CA, Bank Protection Project: Includes initial 
phase covering 405,000 lineal feet of bank protection 
and a second phase covering 430,000 lineal feet of bank 
protection under a long range program of bank protection, 
erosion control works, and setback levees at critical 
locations within limits of authorized or existing levees 
included in the Sacramento River Flood Control project 
to protect integrity of levee system for flood control 
purposes. Total estimated (October 1987) first cost for 
project is $137,000,000, (includes an allowance for 
estimated inflation through the construction period) of 
which $95,800,000 is Federal (including $2,845,000 for 
recreation facilities) and $41,200,000 non-Federal comprising 
for lands and damages including relocations 
and $22,300,000 required cash contribution toward 
first cost. Construction in (a), (b), and (c) above 
supplements program of levee improvements as 
35-16

SACRAMENTO, CA, DISTRICT 
accomplished pursuant to 1917 Flood Control Act, as 
amended by subsequent acts, including 1941 Flood 
Control Act, and which are reported by California 
Debris Commission under Sacramento River, CA, flood 
control. (d) Authorization also provided for Black Butte 
Lake. For description of completed project see Annual 
Report for 1975. Federal first cost for project is 
$14,508,820, including $475,507 for basic recreation 
facilities. For future non-Federal reimbursement, see 
Local cooperation paragraph. Federal cost for recreation 
facilities funded from Code 710 appropriations 
is $1,000,162. A concessionaire at Black Butte Marina 
provided public use facilities in accordance with lease 
agreement with the Secretary of the Army at an 
estimated cost to date of $87,000. (e) Authorization also 
provided for construction of Table Mountain (Iron 
Canyon) project, an earthfill dam on Sacramento River 
about 3 miles north of Red Bluff, CA. This project unit 
was deauthorized August 5, 1977. For details, see 
Annual Report for 1978. 
Local cooperation. (a) Sacramento River and major 
andminor tributaries: Sec. 3, Flood Control Act of June 
22, 1936, applies. Fully complied with for all work 
completed or under contract, and local interests indicated 
they will be able to fulfill requirements for 
remaining work as scheduled. Levee construction (107 
miles) total requirement for the "active" project has 
been completed, transferred to, and accepted by the 
State. (b) Sacramento River, Chico Landing to Red 
Bluff: Sec. 3, Flood Control Act of June 22, 1936, 
applies; local interests must also assume responsibility 
for flood plain zoning. Fully complied with for portions 
completed in Tehama, Butte, and Glenn Counties; 
completed work, bank protection at 36 sites, was transferred 
to and accepted by the State. (c) Sacramento 
River Bank Protection Project: Sec. 3, Flood Control 
Act of June 22, 1936, applies. Local interests must also 
contribute an amount in cash that, when added to costs 
of lands, easements, rights-of-way and utility modifications, 
equals one-third of cost of each unit of remedial 
work; this contribution is estimated (October 1987) at 
$22,500,000. Local interests fully complied with requirements 
for all work completed or under contract, and 
indicated they will be able to fulfill requirements for 
remaining work as scheduled. In addition, for reaches 
where local interests request bank stabilization in lieu 
of more feasible levee setbacks, local interests will 
contribute costs over and above costs of setbacks, and 
provide local contribution indicated above. Completed 
units transferred to and accepted by the State. (d) Black 
Butte Lake: None required for construction. Local 
interests must pay the portion of first cost and annual 
operation and maintenance costs allocated to the conservation 
functions of the project; these costs are estimated 
at 39.9 percent of first cost and 40.2 percent of annual 
costs. From March 2, 1960, to October 22, 1970, contract 
between the Bureau of Reclamation and the State of 
California provided for repayment of irrigation storage 
costs; Bureau administered contract in accordance with 
reclamation law. Local interests paid a total of $77,205 
for irrigation services during this period. Public Law 
502, 91st Cong., 2d sess., October 23, 1970, provided that 
Black Butte project be financially integrated with the 
Central Valley project, coordinated operationally with 
other Central Valley project storage units by the Bureau 
under the Secretary of the Interior, and that dam and 
reservoir at Black Butte be physically operated and 
maintained by the Corps in a manner compatible with 
recreational use of the reservoir. 
Operations and results during fiscal year. New 
work: (a) Sacramento River and major and minor 
tributaries - Engineering activities continued. Contract 
No. 10 for bypass levee revetment on Yolo Bypass 
awarded August 12, 1986, was continued at fiscal year 
cost of $306,895. (b) Sacramento River Bank Protection 
Project-Engineering and design activities continued. 
(See table 35-0 for construction accomplished and 
contract costs.) (c) Sacramento River, Chico Landing to 
Red Bluff. Engineering activities continued. (d) Black 
Butte Lake, regular funds: None. Code 710 funds: None. 
Maintenance: Maintenance and operation activities 
continued. Structures were maintained in serviceable 
condition. Runoff above Black Butte Dam was below 
normal for the year. Maximum storage of 67,800 acrefeet 
occurred May 2, 1987. Maximum estimated inflow 
to Black Butte reservoir was 2,500 cubic feet per second 
on March 13, 1987, and maximum outflow of 390 cubic 
feet per second occurred on October 8, 1986. During the 
year, releases of water for irrigation totaled 120,500 
acre-feet. (e) Table Mountain (Iron Canyon) Lake: None. 
Historical summary. (a) Sacramento River and 
major and minor tributaries (active portions): Construction 
was initiated in May 1949 on Deer Creek and Butte 
Creek units; Cherokee Canal, Elder Creek, Chico and 
Mud Creeks, and Sandy Gulch units have been completed. 
Active portion of this improvement is about 99 
percent complete. Work remaining is bypass levee 
revetment as required. (b) Sacramento River Bank 
Protection Project: Construction of first unit was initiated 
in June 1963; initial phase of project was completed 
in November 1974. Phase II is underway, and overall 
project is about 82 percent complete. (c) Sacramento 
River, Chico Landing to Red Bluff: Active portion of 
project, bank protection in Tehama County, was initiated 
in June 1963 and completed in March 1964. Project was 
reopened in June 1968 to place additional necessary 
bank protection. Work at 36 sites was completed in 
Tehama, Butte, and Glenn Counties as of September 
1985 and transferred to State for maintenance. Bank 
protection on Sacramento River, Tehama County-one 
site, mile 215, (Unit 5), was completed November 1982, 
two sites, mile 209.5 and mile 217.5, (Unit 6), were 
completed in November 1983, and four sites, 241.0, 
237.9, 237.7, and 237.5 (Unit 7) were completed in 
February 1985. (d) Black Butte Lake: Construction 
began in March 1960 and project is complete. Final 
land acquisition was completed in December 1966. 
Construction of main dam was initiated in June 1960 
and completed in December 1963. Dam has been oper- 
35-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
ating since November 1962 to provide the flood protection 
for which it was designed. Final cost allocation 
approved May 3, 1977. Dam safety assurance studies 
were initiated in FY 1980. Piezometer installation and 
slope for protection at the dam were completed in FY 
1983. A cultural resources survey was completed in FY 
1984. (e) Table Mountain (Iron Canyon) Lake: Project 
unit deauthorized as of August 5, 1977. 
22. WALNUT CREEK, CA 
Location. Project is on Walnut Creek and lower 
reaches of its principal tributaries, Pacheco, Grayson, 
San Ramon, Las Trampas, Galindo, and Pine Creeks in 
Contra Costa County, CA. Improvement will extend 
from Suisun Bay to head of project about 1 mile above 
southern limits of city of Walnut Creek. City of Walnut 
Creek is about 10 miles south of Suisun Bay. (See 
Geological Survey quadrangles for area.) 
Existing project. Comprises extension of existing 
levees, construction of new levees and concrete channels, 
channel rectification and enlargement, and utilization 
of improvements constructed or planned by local interests. 
Plan provides for about 21.8 miles of channel 
improvement, two reinforced-concrete drop structures, 
two stilling basins, and 13.8 miles of levees. Cost 
estimate (1987) is $88,800,000 (includes an allowance 
for estimated inflation through the construction period), 
of which $63,400,000 is Federal cost and $25,400,000 is 
non-Federal cost (includes $20,330,000 for lands and 
damages and relocations except railroad facilities, and 
$5,070,000 required cash contribution for land enhancement 
benefits provided by the project). Local interests 
have expended about $3 million for flood control in the 
project area during the period 1955-1965, including the 
concrete conduits constructed through the city of Walnut 
Creek at an estimated cost of $1,000,000 considered a 
preproject condition to be incorporated in the Corps 
project. In addition, local developers have made channel 
improvements for Upper Pine Creek valued at 
$5,050,000. The cost thereof is not included in above 
costs of local cooperation. Improvement adopted by 
1960 Flood Control Act (H. Doc. 76, 86th Cong., 1st sess., 
contains latest published map). 
Local cooperation. Section 3, Flood Control Act of 
June 22, 1936, applies, except that relocation of railroad 
facilities is a Federal responsibility. In addition, local 
interests must make a cash contribution to the United 
States, in amount of 7.4 percent of cost of construction 
for land enhancement benefits provided by project. 
Cash contribution is estimated (October 1987) at 
$5,070,000. Local interests are represented by Contra 
Costa County Flood Control and Water Conservation 
District; formal assurances, including evidence of financial 
and legal ability to fulfill requirement for the cash 
contribution, were accepted by the Sacramento District 
Engineer on November 15, 1963. The Flood Control 
District furnished all rights-of-way required to date 
and indicated that it will furnish all requirements as 
needed for future construction. The Flood Control 
District will arrange for highway bridge modifications 
and utility relocations before start of work by the Corps 
contractor. Payment of required contributed funds will 
be made in installments in amounts equal to 7.4 percent 
of the estimated construction expenditure for each 
fiscal year. To date, $4,365,081 has been furnished. 
Operations and results during fiscal year. New 
work: Engineering and design for the uncompleted 
portions of Walnut and San Ramon Creeks and upper 
Pine Creek is continuing. Construction on San Ramon 
Bypass Channel has been split into three contracts. 
Contract No. 1 was continued at fiscal year contract cost 
of $229,160 and Contract No. 2 was continued at fiscal 
year contract cost of $3,112,301. Construction on Upper 
Pine Channel was initiated at a fiscal year contract cost 
of $1,860,475. 
Historical summary. Construction was initiated 
June 1964; project is about 85 percent complete. Total of 
16.7 miles of channel improvement, 9.2 miles of levee 
construction, part of channel improvement landscaping, 
and Drop Structures No. 1 and 2 have been transferred 
to local interests for operation and maintenance. Planning 
and design continued on remaining reaches. Work 
remaining consists of channel improvement on Walnut 
Creek and San Ramon bypass (Ygnacio Valley Road to 
Rudgear Road along SPRR alignment) and upper Pine 
Creek. 
Construction responsibility was transferred from 
San Francisco District on April 1, 1982. 
23. WILDCAT AND SAN PABLO 
CREEKS, CA 
Location. Project is located in vicinity of San Pablo 
and Richmond, Contra Costa County, CA, about 20 
miles northeast of San Francisco, CA. 
Existing project. Plan of improvement consists of 
15,900 lineal feet of channel improvements on Wildcat 
Creek and 9,600 lineal feet of channel improvements on 
San Pablo Creek. Improvements include channel deepening, 
levees, stilling basins, and flow control weirs. 
Plan would also create a linear park environment with 
picnic facilities, comfort stations, full environment 
treatment, and a two-mile segment of trail to connect 
with other regional park trails in the vicinity. Approved 
estimated cost of new work (1987) is $35,800,000 (includes 
an allowance for estimated inflation through the 
construction period), of which $21,500,000 is Federal 
cost, and $14,300,000 is non-Federal cost (includes 
$1,800,000 cash contribution). Improvements adopted 
by House and Senate Public Works Committee 
Resolutions June 9 and 15, 1976, respectively, under 
provisions of sec. 201 of Flood Control Act of 1965 (H. 
Doc. 511, 94th Cong., 2d sess., contains latest published 
map). 
Local cooperation. Local interests will be required 
to: (a) provide, without cost to the United States, all 
lands, easements, and rights-of-waynecessary for construction 
and operation of the project, including disposal 
35-18

SACRAMENTO, CA, DISTRICT 
areas, and adhere to requirements of sec. 210 of the 1970 
Uniform Relocation Assistance and Real Property 
Acquisition Policies Act, Public Law 91-646; (b) modify 
or relocate all utilities and bridges (except railroad) 
necessary for construction and maintenance of the 
project with such modifications and replacements being 
in accordance with plans approved by the Chief of 
Engineers, and replace vehicular traffic facilities, including, 
but not limited to, streets, curbs, gutters, and 
signs affected by the project; (c) maintain and operate 
the flood control portion of the project after completion, 
in accordance with regulations prescribed by the Secretary 
of the Army, and prevent encroachment of the 
flood channels that may result in decreasing the effectiveness 
of the project; (d) maintain, operate, and 
replace recreation facilities; (e) hold and save the 
United States free from damages due to construction 
works; (f) adjust all claims regarding water rights that 
might be affected by the project; (g) make a cash 
contribution prior to start of construction for that 
portion of the cost of recreation lands and recreational 
facilities; (h) assure access to all persons on equal terms 
for approved recreational use; (i) at least annually 
inform affected interests regarding the limitations of 
protection afforded by the project; and (j) publicize 
flood plain information in the areas concerned and 
provide this information to zoning and other regulatory 
agencies for their guidance and leadership in preventing 
unwise future development in the flood plain, and in 
adopting such regulations as may be necessary to insure 
compatibility between future development and protection 
levels provided by the project. The Board of 
Supervisors of Contra Costa County by Resolution 73- 
466, June 25, 1973, agreed to assume obligations of 
local cooperation. On November 9, 1976, the Board 
reaffirmed sponsorship by Resolution 76-960. Contra 
Costa County Flood Control and Water Conservation 
District Board of Supervisors formed an Assessment 
District, August 3, 1982, which assures availability of 
funds for local share of non-Federal portion of project 
costs for a modified plan of improvement. A flood 
control Local Cooperation Agreement satisfying all 
requirements of sec. 221, Flood Control Act of 1970 
(Public Law 91-661) and consistent with the Water 
Resources Development Act of 1986 (Public Law 99- 
662), was executed on June 20, 1986 between the 
Department of the Army and the Contra Costa County 
Flood Control and Water Conservation District. By 
Resolution No. 1985-12-351, adopted December 17, 
1985, the East Bay Regional Park and Recreation 
District stated support for development of trail and 
recreational improvements for the project and indicated 
its intent to share in 50 percent of the cost of such 
improvements and perform operation and maintenance 
responsibility. A recreation Local Cooperation Agreement 
will be required prior to initiation of that 
construction. 
Operations and results during fiscal year. Construction 
on Reach l of channel improvement on Wildcat 
Creek was initiated at a fiscal year contract cost of 
$2,192,167. 
Historical summary. Local interests withdrew 
support of project in 1979. Project responsibility was 
transferred from San Francisco District on April 1, 
1982. After 1982-1983 floods, local interests again 
indicated support of the project, and in October 1983, 
project work was resumed by Sacramento District. A 
revised final environmental impact statement was filed 
March 28, 1986, and a general design memorandum 
was approved May 29, 1986. Flood Control Local 
Cooperation Agreement was executed June 20, 1986.. 
24. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Approved regulations for operation and maintenance 
of flood control works, part 208, title 33, Code of Federal 
Regulations, provide for inspection of completed projects 
transferred to local interests for operation and maintenance 
to determine status of project and insure compliance 
with regulations. During fiscal year, inspections 
were made of: Completed units of Sacramento River 
and major and minor tributaries; completed units of 
Sacramento River, Chico Landing to Red Bluff; completed 
units of Sacramento River flood control project, 
Kings River Channel Improvement (Pine Flat Lake 
project), and Walnut Creek project; American River 
levees; Chester, North Fork Feather River; levee and 
channel improvements on Chowchilla River (Buchanan 
project) and Fresno River (Hidden project); Duck Creek 
diversion, Green Valley Creek, Littlejohn Creek, 
Mormon Slough, Bear Creek, Kern River-California 
Aqueduct Intertie, and North Fork, Pit River at Alturas, 
all in California; Truckee River, CA and NV; completed 
units of lower San Joaquin River and tributaries, CA; 
Big Dry Creek Dam and diversion, CA; Reese River, 
Battle Mountain, NV; Sevier River, Redmond and 
vicinity, Jordan River, Big Wash near Milford, and 
Kays Creek, all in Utah; various emergency flood 
control works under authority of sec. 208, Flood Control 
Act of June 30, 1948, and September 3, 1954; Public 
Law 99, June 28, 1955, and antecedent legislation; and 
sec. 14 of Flood Control Act of July 24,1946. Maintenance 
inspections conducted indicate that existing agreements 
and regulations are being complied with on completed 
flood control works. Continuing effort is required to 
improve maintenance practices and active steps are 
being taken by responsible State and local agencies to 
achieve desired results. Local agencies were advised, as 
necessary, of measures required to maintain these 
projects in accordance with standards prescribed by 
regulations. Total cost of inspection for fiscal year of 
$702,348 included continuation of dam safety assurance 
program for Folsom Lake, CA ($175,178). 
35-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
25. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to sec. 205, Public 
Law 858, 80th Congress, as amended (Preauthorization). 
Costs for preauthorization studies for fiscal year were 
$233,167. See Table 35-P for list of studies. 
Emergency flood control activities-repair, flood 
fighting, and rescue work (Public Law 99, 84th 
Cong., and antecedent legislation). 
Federal cost for fiscal year was $9,897,458, of which 
$262,280 was for disaster preparedness, $602,115 for 
flood emergency operations, $8,922,338 for repair and 
restoration, and $110,725 for advance measures. 
Emergency bank protection (sec. 14, 1946 Flood 
Control Act, Public Law 526, 79th Cong.). 
Federal cost for fiscal year was $20,486. Bank 
protection was initiated on Spanish Creek, CA ($11,824) 
and Wolf Creek, CA ($2,500); Uncompahgre River, 
Olathe, CO ($2,500); and Green River, Lincoln County, 
WY ($3,662). 
Snagging and clearing navigable streams and 
tributaries in interest of flood control (sec. 208,1954 
Flood Control Act, Public Law 780, 83d Cong.). 
Federal cost for fiscal year was $5,000. Initial 
appraisals for snagging and clearing were initiated, 
completed and found to be infeasible for Mokelumne 
River near Interstate 5, CA ($2,500) and Walker River, 
Yerington, NV ($2,500). 
Flood insurance activities (sec. 1301-1377, 1968 
Housing and Urban Development Act, Public Law 
90-448 as amended). 
In coordination with flood control activities, four 
flood insurance studies were initiated, three flood 
insurance studies were continued, and three flood 
insurance studies were completed in accordance with 
Inter-Agency Agreements EMW-E-1153, 2226 and 2549, 
respectively, at a fiscal year cost of $425,663 under 
Federal Emergency Management Agency reimbursable 
order. 
26. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
In accordance with sec. 7, Flood Control Act of 1944, 
summaries of monthly operations at Big Dry Creek, 
Boca, Camanche, Del Valle, Folsom, Friant (Millerton 
Lake), Indian Valley, Los Banos Detention, New Bullards 
Bar, New Don Pedro, New Exchequer (Lake McClure), 
New Melones, Oroville, Prosser, Shasta, and Stampede, 
CA; East Canyon, Echo, Lost Creek, Pineview, Starvation, 
and Wanship, UT; and Blue Mesa, Lemon, Paonia, 
and Vallecito, CO reservoirs were prepared. Work was 
begun and essentially completed on Folsom water 
control manual and essentially completed on the Blue 
Mesa water control manual. Corps personnel provided 
advice as requested during flood control operations at 
all sec. 7 reservoirs. Fiscal year cost was $325,314. Total 
cost to September 30, 1987, $3,278,226. 
Multiple-Purpose Projects including Power 
27. NEW MELONES LAKE, CA 
Location. On Stanislaus River about three-quarters 
mile downstream from existing Melones Dam and 
about 35 miles northeast of city of Modesto. (See 
Geological Survey quadrangles of the area.) 
Existing project. Provides for construction of (a) an 
earth and rockfill dam about 625 feet high to create a 
reservoir with gross storage capacity of about 2,400,000 
acre-feet for flood control, irrigation, power, general 
recreation, fish and wildlife, and other purposes, and (b) 
a powerplant below the dam with an installed capacity 
of 300,000 kilowatts. Upon completion of construction of 
dam and powerplant by the Corps, the project became 
an integral part of Central Valley project and is being 
operated and maintained by the Secretary of the Interior 
pursuant to Federal reclamation laws, except that the 
flood control operation of the project shall be in accordance 
with rules and regulations prescribed by the 
Secretary of the Army. Maintenance of Stanislaus 
River channel from Goodwin Dam to San Joaquin River 
to a capacity of at least 8,000 cubic feet per second will 
also be Corps responsibility. Approved estimated 
(October 1987) Federal cost is $391,000,000 (includes an 
allowance for estimated inflation through the construction 
period). For future non-Federal reimbursement, 
see Local cooperation paragraph. In addition, local 
interests expended $300,000 for levees along lower 
reaches of Stanislaus River. Existing project was 
adopted by 1962 Flood Control Act (H. Doc. 453, 87th 
Cong., 2d sess., contains latest published map). This act 
modified original authorization adopted by 1944 Flood 
Control Act. (H. Flood Control Committee Doc. 2, 78th 
Cong., 2d sess., contains latest published map.) The 
1944 Flood Control act established $8 million monetary 
limitation for partial accomplishment of project. Further 
monetary authorizations of $2.5 million, $5 million, 
$13 million, $2 million, $17 million, $18 million, $44 
million, $83 million, $46 million, $6 million, and $61 
million were provided for this project by Public Laws 
235 and 780, 83d Cong., and 85-500, 90-17, 90-483, 91- 
282, 92-222, 93-251,94-397, 95-104, and 95-189, making 
a total monetary authorization of $305,500,000 available 
for the basin plan comprising Lower San Joaquin River 
and tributaries, including Tuolumne and Stanislaus 
Rivers, CA. Since FY 1979, appropriations have not 
been subject to the river basin monetary limitation. 
Local cooperation. Based on approved preliminary 
cost allocation studies (July 1965) local interests will be 
required to pay 35.2 percent of first cost and 12.7 
percent of annual operation and maintenance costs 
allocated to irrigation. In addition, 31.1 percent of first 
cost and 62.5 percent of annual cost would be allocated 
to power. Local interests must also maintain existing 
private levees along Stanislaus River from Goodwin 
35-20

SACRAMENTO, CA, DISTRICT 
Dam to San Joaquin River and prevent encroachment 
on channel and floodway between levees to preserve 
safe carrying capacity throughout the reach of at least 
8,000 cubic feet per second. Recovery of costs allocated 
to irrigation and power will be the responsibility of the 
Bureau of Reclamation. Reimbursement of costs will be 
in accordance with Bureau policies and procedures for 
the Central Valley project. State of California officially 
adopted project by chapter 918 of statutes of 1963, and 
by chapter 1438 of those statutes authorized State 
Reclamation Board to furnish required assurances. The 
Board, by letter dated December 13, 1963, stated it 
would furnish required assurances when formally 
requested to do so. Assurances were requested by letter 
of December 30, 1977. On October 2, 1979, the Board 
reaffirmed its intent to furnish the required assurances. 
On January 6, 1983, the Board provided formal assurances 
of local cooperation. 
Operations and results during fiscal year. New 
work: Engineering activities continued. Fiscal year 
costs for major items of work included: Continuation of 
land acquisition activities, $3,351,531; continuation of 
McHenry recreation area contract, $577,216; and 
initiation and essential completion of the following 
contracts: Sanitary facility modifications at Tuttletown, 
$862,189; Knights Ferry recreation area, $868,651; and 
road paving at Glory Hole and Tuttletown, $687,510. 
Maintenance: Maintenance and operation activities 
continued on Lower Stanislaus River. 
Historical summary. Construction was initiated in 
August 1966. Main dam contract which was awarded in 
March 1974 has been completed; dam dedication ceremonies 
were held July 14, 1979. Cultural resources 
preservation, water intake facilities, flood control and 
irrigation tailrace modification, reservoir area clearing, 
Tuttletown Phase I recreation area, Oakdale recreation, 
Glory Hole Phase I and Phase II recreation area, and 
operations access road contracts have all been completed. 
Glory Hole minimal recreation facilities contract has 
been completed. A boundary fencing contract, Lower 
Stanislaus Phase I and Phase II minimal recreation 
facilities contract, Lower Stanislaus Corporation Yard 
contract, and Lower Stanislaus Administration Building 
contract have been completed. Tuttletown minimal 
recreation facilities contract has been completed. 
McHenry recreation area contract has been initiated. 
Overall project is nearing completion except for Lower 
Stanislaus River recreation facilities. Remaining recreation 
facilities were unscheduled pending specific 
Congressional appropriation of funds. A Memorandum 
of Understanding between the Department of the 
Interior and the Department of the Army transferring 
the New Melones dam and reservoir from the Corps of 
Engineers to the Bureau of Reclamation was executed 
on November 20, 1979. Agreement provides that the 
Corps complete land acquisition actions and retain 
budgeting, design, and construction responsibility for 
reservoir clearing and recreation development; completion 
of cultural resources mitigation in project area 
was vested in the Department of the Interior. The 
California State Water Resources Control Board's 
Decision 1422 of April 1973 established conditions 
which impacted on the planned filling and operation of 
the project by the Department of the Interior. As a 
result, the Department of Interior brought suit against 
the State of California claiming State limitations on 
project operation were contrary to Congressional intent 
and authority. The case was heard before the U.S. 
District Court in Fresno, CA, and in early March 1981, 
a Federal judge ruled that the Federal Government 
could fill the New Melones reservoir for purpose of 
generating electrical power, but not for agricultural or 
other purposes. Both the Government and the California 
State Resources Control Board appealed this decision 
to the 9th Circuit Court of Appeals in San Francisco, 
CA. 
On December 20, 1982, the Court upheld all 25 
requirements placed on the Federal Government by the 
State Water Resources Control Board. The decision 
reversed the lower court's decision to permit filling of 
the reservoir for generating electrical power. The 
Bureau of Reclamation subsequently filed for a permit 
from the State Water Resources Control Board to fill 
the reservoir. Permit was approved. The Bureau had 
originally started generating power on a limited basis 
on July 1, 1979; however, after the filling of the 
reservoir in spring of 1983, full power generating 
benefits are being attained. Project is about 99 percent 
complete. 
General Investigations 
28. Surveys 
Fiscal year costs were $2,448,061, of which $2,235,033 
was for flood damage prevention studies (in addition, 
$184,649 was expended from required cost contributions 
for feasibility cost shared studies and $40,000 was 
expended from other non-Federal contributions); $5,000 
for coordination with Soil Conservation Service; $14,000 
for coordination with Bureau of Reclamation pertaining 
to projects under reclamation program (including 
PL 984); $105,000 for special investigations; $35,000 
review of FERC licenses; and $54,028 for planning 
assistance to states ($19,028, CA; $15,000, UT; and 
$20,000, CO). 
MORRISON CREEK STREAM 
GROUP, CA (PHASE I, STUDY) 
Minor fiscal year costs were $17,181. 
29. COLLECTION AND STUDY OF 
BASIC DATA 
Technical assistance was performed for other Federal 
agencies as well as non-Federal agencies in connection 
with Flood Plain Management Services Program at 
fiscal year costs of $379,873. No Flood Plain Information 
Studies were prepared after FY 1980. 
Fiscal year costs for hydrologic studies were $8,000. 
35-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
30. RESEARCH AND DEVELOPMENT 
The Hydrologic Engineering Center was designated 
as a separate Field Operating Agency as of January 1, 
1979, in accordance with OCE permanent orders 1-1, 
January 10, 1979, but Sacramento District is continuing 
to provide advisory and administrative support services 
to HEC as specified in local support agreement 
DACW05-79-A-0038 of March 1979. Fiscal year costs 
were $963,960, of which $126,294 was for planning 
methodologies, $551,154 was for analytical techniques, 
$97,209 for Water Conservation and Supply, $119,720 
for risk assessment for Corps dams and $69,583 for 
earth resources satellites, all at the Hydrologic Engineering 
Center. 
31. PRECONSTRUCTION, 
ENGINEERING AND DESIGN 
CACHE CREEK BASIN, CA 
Project is located on eastern slope of the Coast Range. 
Clear Lake unit is about 110 miles north of San 
Francisco and Settling unit is about 15 miles northwest 
of Sacramento. 
Plan of improvement consists of two project units: 
Upper basin at Clear Lake-widening and/or deepening 
3.3 miles of existing 5 mile long Clear Lake outlet 
channel to a capacity of 8,000 cubic feet per second, 
constructing a 1.1 mile long bypass channel around the 
highly developed area adjacent to existing channel, and 
nonstructural measures; and lower basin at the mouth 
of Cache Creek-enlarging existing perimeter levees of 
Cache Creek Settling Basin an average of 12 feet to 
provide 50 years of sediment storage capacity and 
enlarging existing project levees from settling basin 
mouth upstream to County Road 102, reconstructing 
and enlarging existing Cobble weir, degrading the 
existing training levees and rebuilding them adjacent 
to the western perimeter levee to allow utilization of 
entire basin for sediment deposition, purchasing in fee 
3,600 acres of existing settling basin and establishing a 
wildlife refuge and nonstructural measures. 
Preconstruction planning estimate is $3,000,000. Continuation 
of planning and engineering, including a 
sedimentation study for Upper Basin and separate 
General Design Memorandums for the Clear Lake 
Outlet Channel (Upper Basin) and Cache Creek Settling 
Basin (Lower Basin) without wildlife refuge was 
continued at a fiscal year cost of $514,136. 
COTTONWOOD CREEK, CA 
Project will be located on main stem and the North, 
South, and Middle Forks of Cottonwood Creek on 
eastern slope of the Coast Range and southern slope of 
Trinity Range between cities of Redding and Red Bluff, 
CA, and was authorized by the 1970 Flood Control Act 
(Document not yet printed). 
Plan of improvement provides for two multiplepurpose 
reservoirs, one at Dutch Gulch (capacity 900,000 
acre-feet) and one at Tehama (capacity 700,000 acrefeet), 
and includes base facilities for future installation 
of hydropower generating equipment. 
General Design Memorandum and Environmental 
Impact Statement were completed in FY 1984. Advance 
Engineering and Design activities were essentially 
discontinued in FY 1985 as by letter of June 25, 1985, 
the State of California indicated they could not financially 
participate in the project at this time. Final 
documentation of record of the Advance Engineering 
and Design studies was continued at a fiscal year cost of 
$4,979. 
GUADALUPE RIVER, CA 
Project is located in the downtown area of San Jose in 
Santa Clara County, CA. 
Plan of improvement includes widening and deepening 
of one or both sides of Guadalupe River for 3.5 
miles and the construction of an underground concrete 
channel bypass conduit 2,900 feet long to provide flood 
protection to downtown San Jose, including approximately 
550 commercial businesses, 2,400 private 
residences, 4 major traffic arteries, and the San Jose 
International Airport. Plan also includes fish and 
wildlife mitigation measures, would preserve to the 
greatest degree possible the existing riparian vegetation 
along Guadalupe River, and would also enhance the 
redevelopment potential of the downtown San Jose 
area. 
Estimated preconstruction planning cost is 
$2,000,000. Feasibility Report was transmitted to the 
Assistant Secretary of the Army on June 10, 1987. 
General Design Conference was held in June 1987 and 
General Design Memorandum was initiated at fiscal 
year cost of $435,345. 
32. OTHER WORK UNDER SPECIAL 
AUTHORITY 
Under the Aquatic Plant Control Program (River 
and Harbor Act of 1965, sec. 302, Public Law 289, 89th 
Congress) a State Design Memorandum and an environmental 
assessment regarding the waterhyacinth problem 
in the Sacramento-San Joaquin Delta, CA, were 
completed by the Corps in FY 1985. The Calif Department 
of Boating and Waterways had requested assistance 
from the Corps on September 28, 1981, to find a 
solution to the waterhyacinth problems in the Delta. In 
a meeting on May 28, 1985, the Department of Boating 
and Waterways notified the Corps that the State control 
program had reduced the problem to a maintenance 
problem, that State funding is adequate to operate the 
current waterhyacinth maintenance program, and that 
Federal assistance is not needed at this time. State 
35-22

SACRAMENTO, CA, DISTRICT 
control program included chemicals to eliminate the 
immediate problem and biological control agents to 
provide long term control. Cost sharing agreement (70 
percent Federal-30 percent State) was not applicable to 
preparation of State Design Memorandum nor the 
environmental assessment. Waterways Experiment 
Station (WES) has essentially completed a research 
study at an estimated cost of $60,000 to identify extent 
of water-hyacinth infestation in the Delta and Central 
Valley of California and to identify pathogens to control 
such infestation. Research report is to assist Sacramento 
District with its waterhyacinth problem and is scheduled 
for completion in February 1988. Total Federal cost as 
of September 30, 1987, was $153,670. 
35-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 35-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep 30, 1987 
1. Sacramento River, 
CA 
2. Sacramento River 
Deep Water Ship 
Channel, CA 
Required Contributed 
Funds) 
3. San Francisco Bay 
to Stockton, CA 
(John F. Baldwin and 
Stockton Ship 
Channels) 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
4. San Joaquin River, New Work 
CA Approp. 
Cost 
Maint. 
Approp. 
Cost 
5. Buchanan Dam-H.V. New Work 
Eastman Lake, Approp. 
Chowchilla River, CA Cost 
(Federal Funds) Maint. 
Approp. 
Cost 
(Contributed Funds, New Work 
Other) Contrib. 
Cost 
6. Calaveras River and New Work 
Littlejohn Creek and Approp. 
Tributaries including Cost 
New Hogan Lake and Maint. 
Farmington Dam, CA Approp. 
(Federal Funds) Cost 
(Contributed Funds, New Work 
Other) Contrib. 
Cost 
7. Corte Madera Creek, CA New Work 
(Federal Funds) Approp. 
Cost 
(Required Contributed New Work 
Funds) Contrib. 
Cost 
(Contributed Funds, New Work 
Other) Contrib. 
Cost 
8. Fairfield Vicinity New Work 
Streams, CA Approp. 
Cost 
(Contributed Funds, New Work 
Other) Contrib. 
Cost 
9. Hidden Dam-Hensley New Work 
Lake, Fresno Approp. 
River, CA Cost 
(Federal Funds) Maint. 
Approp. 
Cost 
856,000 1,835,000 
2,025,601 1,892,496 
- 33,474 
1,807,800 
1,841,271 
800,000 
649,054 
- 40,331,1921 
- 40,331,1921 
3,973,000 42,896,6312 
3,914,755 42,821,7863 
400,000 1,233,4744 
450,454 1,099,5084 
85,000 85,000 
3,680,000 13,580,000 12,513,000 3,137,000 50,593,0005 
4,314,658 14,903,051 12,140,776 4,354,831 50,159,5346 
- - - - 5,833,1177 
- - - - 5,833,1177 
850,000 625,000 20,000 778,000 12,725,4768 
898,753 565,138 80,224 764,102 12,708,9088 
- - - - 27,369,597 
- - - - 27,369,597 
804,000 819,000 853,000 1,150,000 7,876,500 
889,621 861,266 870,983 1,062,828 7,732,713 
- - - - 111,1879 
- - - - 111,1879 
- - - - 23,723,14410 
- - - - 23,723,14410 
1,074,000 1,563,000 1,124,000 1,740,300 14,882,46911 
1,093,472 1,551,672 1,132,703 1,641,032 14,654,50511 
30,000 40,000 20,000 4,000 1,398,25112 13 14 
24,440 43,920 26,468 6,780 1,398,10712 13 15 
325,000 525,000 2,374,000 1,325,000 11,583,72516 
281,271 390,051 1,602,532 1,869,610 11,178,05916 
- 110,000 -50,000 - 166,09517 18 
- 5,156 41,977 11,109 159,56618 
- - 270,000 - 806,921'19 
- - 121,420 103,880 762,22120 
320,000 155,000 905,000 582,000 2,649,000 
282,442 176,886 285,206 998,510 2,430,047 
- - - 200,000 200,00021 
- - - 30,555,426 
- - - - 30,555,426 
773,000 969,000 874,000 918,000 8,776,500 
855,484 940,029 897,340 893,031 8,696,581 
35-24 
i

SACRAMENTO, CA, DISTRICT 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
(Contributed Funds, 
Other) 
10. Isabella Lake, Kern 
River, CA 
(Federal Funds) 
(Contributed Funds, 
Other) 
11. Kaweah and Tule 
Rivers including 
Terminus Dam and 
Success Lake, CA 
(Contributed Funds, 
her) 
12. Little Dell 
Lake, UT 
(Contributed Funds, 
Other) 
13. Lower San Joaquin 
River, CA 
14. Martis Creek Lake, 
Martis Creek, NV, 
and CA 
15. Merced County 
Streams, CA 
16. Merced County Stream 
Group, CA 
17. Pajaro River 
Basin, CA 
(Federal Funds) 
(Required Contributed 
Other) 
(Contributed Funds, 
Other) 
18. Pine Flat Lake and 
Kings River, CA 
(Federal Funds) 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
- 165,11222 
- 165,11222 
- 24,450,53723 24 
- 24,450,53723 24 
1,773,000 3,450,000 2,426,000 3,882,598 
1,920,956 3,450,385 2,519,690 3,863,211 
- - - 20,000 
- - - 10,230 
27,322,59625 26 
27,185,92825 26 
458,00027 
448,32028 
- 34,997,23029 
- 34,997,23029 
1,524,000 1,652,000 
1,758,899 1,623,969 
- 20,000 
- 3,364 
1,893,000 
1,918,526 
135,000 
80,405 
515,000 90,000 1,335,000 
143,472 358,810 1,274,320 
-- 300,000 
2,164,000 
2,076,605 
105,000 
114,581 
2,500,000 
1, 43,225 
3,260,000 
2,250,170 
23,137,52530 
22,915,73130 
302,42031 32 34 
240,77031 33 35 
6,644,900 
5,374,728 
3,560,00036 
2,250,17037 
350,000 2,300,000 448,000 900,000 3,998,000 
311,799 2,259,644 415,547 132,867 3,119,856 
- - - 8,504,989" 
- - - 8,504,98938 
242,000 1,069,000 252,000 272,000 3,970,350 
300,768 947,669 359,725 282,598 3,937,052 
6,141 
20,000 180,000 450,000 7,000,000 
100 121,269 319,218 6,790,487 
-2,751,25939 
- 2,751,25939 
47,000 130,000 
97,228 81,967 
50,000 
132,984 
60,000 
71,498 
81,000 113,000 1,553,506 
109,537 118,837 1,534,864 
20,000 480,000 
10,396 101,162 
- 61,000 
- 650 
- 21,000 
2,749,96840 
2,361,13840 
61,000 
650 
21,00041 
- - - 43,356,26542 43 44 
- - - 43,356,26542 43 44 
1,481,000 1,448,000 1,492,000 1,395,000 19,643,28545 46 
1,401,043 1,632,427 1,464,946 1,365,827 19,500,01145 46 
35-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project 
(Required Contributed 
Funds) 
Contributed Funds, 
ther) 
19. Redbank and Fancher 
Creeks, CA 
(Federal Funds) 
20. Russian River Basin, 
CA 
Coyote Valley Dam 
(Lake Mendocino) and 
Channel Improvements 
(Federal Funds) 
Contributed Funds, 
Other) 
Dry Creek (Warm 
Springs) Lake and 
Channel Improvements, 
CA 
(Contributed Funds, 
Other) 
21. Sacramento River and 
Tributaries, CA 
from Collinsville to 
Shasta Dam 
(Federal Funds) 
(Required Contributed 
Funds) 
(Contributed Funds, 
Other) 
22. Walnut Creek, CA 
(Federal Funds) 
(Required Contributed 
Funds) 
(Contributed Funds, 
Other) 
23. Wildcat and San Pablo 
Creeks, CA 
Required Contributed 
Funds) 
(Contributed Funds, 
Other 
27. Lower San Joaquin 
River and 
Tributaries, CA 
including Tuolumne 
Total Cost to 
Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
10,000 10,000 
- - - 110,00047 
- - - 110,00047 
29,065 820,000 685,000 1,534,06548 
- 813,805 468,756 1,282,56148 
- - - 14,435,86949 
- - - 14,435,86949 
1,707,000 
2,036,905 
50,000 
56,295 
12,000,000 
16,490,897 
1,500,000 
1,565,404 
85,000 
81,218 
5,500,000 
5,301,011 
2,542,000 
2,518,357 
78,411 
66,758 
8,615,000 
8,878,305 
3,467,102 
3,445,754 
5,000 
21,290 
12,670,000 
8,577,136 
1,213,000 1,508,000 1,772,000 1,962,000 
1,316,176 1,524,472 1,758,290 1,864,917 
30,000 30,000 - 55,000 
- 40,400 3,381 60,698 
4,365,000 4,102,000 4,042,500 7,574,000 
4,360,826 5,216,643 3,921,536 6,714,273 
1,330,000 969,000 941,000 2,058,000 
1,382,425 906,080 1,011,304 2,007,449 
495,000 1,723,000 1,600,000 400,000 
484,650 2,363,965 923,511 969,483 
34,000 75,000 90,000 100,000 
3,143 96,121 101,299 78,785 
1,335,000 1,280,000 4,591,000 7,700,000 
2,848,189 994,554 3,667,875 6,049,719 
47,165 -483,000 710,000 1,026,834 
239,037 -476,657 641,386 625,832 
220,000 622,000 -210,000 2,323,166 
- 783,015 -232,098 1,672,179 
320,000 500,000 526,000 2,800,000 
313,561 359,187 404,415 2,606,849 
- - 160,000 15,158 
- - - 140,472 
- - 150,000 265,000 
-- - 302,467 
5,700,000 4,700,000 5,719,000 6,830,000 
6,251,283 5,500,387 2,855,897 7,915,389 
26,156,1775o 51 
26,020,262o 51 
238,41152 
238,35753 
306,119,6454 
300,797,04554 
9,163,00055 6 
8,910,5426 56 
115,00057 
104,478 s 
100,217,00859 60 
98,996,52059 60 
14,935,33461 
14,816,22261 
18,955,538 
18,753,340 
2,751,36262 63 
2,726,13862 63 64 
51,147,43065 
48,199,30466 
4,365,08167 
3,871,94466 
5,198,23769 
4,461,40769 
5,256,000 
4,794,012 
165,158 
140,472 
425,00070 
302,467 
353,986,99671 71 
351,598,31271 72 
35-26

SACRAMENTO, CA, DISTRICT 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
aRnivde Srst,a nCiAsl,a uNsew Approp. 411,000 437,000 550,200 593,000 3,503,200 
Melones Lake, CA Cost 433,032 462,832 529,709 608,037 3,467,115 
(Federal Funds) 
(Contributed Funds, New Work 
Other) Contrib. 80,000 - - - 80,00073 
Cost 4,486 - - - 4,48674 
1. Includes the following amounts for new work: Regular 
funds: Previous project, $185,198; existing project, $585,436 
for shallow-draft and $39,560,558 for deep-draft. 
2. Includes the following funds for maintenance: Regular 
funds: Previous project, $553,720; existing project, $15,591,707 
for shallow-draft and $26,681,204 for deep-draft; and deferred 
maintenance funds, $70,000 for shallow-draft. 
3. Includes the following costs for maintenance: Regular 
funds: Previous project, $553,720; existing project, $15,517,190 
for shallow-draft and $26,680,875 for deep-draft; and deferred 
maintenance funds, $70,000 for shallow-draft. 
4. Includes unobligated carryover for continuation of 
planning and engineering (CP&E) funds as of September 30, 
1985 ($33,474) for Sacramento River Deep Water Ship Channel 
to be included in project cost (for cost sharing) per TWX of 
September 9, 1985. 
5. Includes $24,367,800 funds for Sacramento District 
and $26,225,200 or San Francisco District. 
6. Includes $24,148,931 costs for Sacramento District 
and $26,010,602 for San Francisco District. 
7. Includes $1,158,348 public work funds, of which $207,198 
was for work done along 30-foot channel in Suisun Bay 
Channel; excludes $19,000 expended for engineering for 
inactive portion of 1950 modification. In addition, $1,342,500 
was expended from required contributed funds. 
8. In addition, $1,250 was expended from required contributed 
funds. 
9. Contributed funds, other, from State of California for 
design and construction of downstream channel improvements 
on Ash and Berenda Sloughs below Buchanan Dam. 
10. Includes Code 710 funds and costs for recreation 
facilities at New Hogan Lake: Total to date $897,742. 
11. Includes $99,000 special recreation use fees and costs 
at New Hogan Lake. 
12. For miscellaneous construction under local cooperation 
requirements, primarily Bear Creek, San Joaquin County; 
includes $108,056 as related to Duck and Littlejohn Creeks 
channel improvements as part of Farmington Dam project 
unit. 
13. Includes $393,195 contributed funds, other, from California 
Department of Boating and Waterways for design and 
construction of boat launching and related facilities, and 
$30,000 for design and construction of a boarding float at 
North Shore recreation area at New Hogan Lake. 
14. Includes $104,000 contributed funds, other, from 
Calaveras County Water District for New Hogan hydropower 
studies. 
15. Includes $103,856 contributed funds, other, costs for 
New Hogan hydropower studies. 
16. Includes $6,999,725 San Francisco District construction 
funds and costs for Corte Madera Creek. 
17. $8,695 contributed funds transferred to Sacramento 
District in FY 1983. 
18. Includes $97,400 San Francisco District required 
contributed funds and costs. 
19. Contributed funds, other, from Marin County including 
$536,921 for miscellaneous bridge and road relocations and 
270,000 for additional expenses for disposal sites at Corte 
Madera Creek. 
20. Contributed funds, other, costs including $536,921 for 
miscellaneous bridge and road relocations and $225,300 for 
additional expenses for disposal sites at Corte Madera Creek. 
21. Includes $200,000 contributed funds, other, from State 
of California for relocations (automotive type bridges) at 
Laurel Creek Diversion near Fairfield. 
22. Contributed funds, other, from State of California for 
miscellaneous ,design and construction at Hidden Dam. 
23. Includes total Code 710 funds and costs for recreation 
facilities at Isabella Lake: Total to date $2,199,085. 
24. Includes $224,000 Code 713 funds and costs for 
improvement at Tillie Creek and Live Oak campgrounds. 
25. Includes $407,640 special recreation use fees and costs 
at Isabella Lake. 
26. Includes $131,900 maintenance and operation of dam 
funds and costs (96X5125) at Isabella Lake beginning in FY 
1985. 
27. Includes $438,000 contributed funds, other, from 
California Department of Boating and Waterways for design 
and construction of boat launching and related facilities at 
Old Isabella Road and Isabella Peninsula and $20,000 for 
Isabella Dam hydropower studies. 
28. Includes $10,320 contributed funds, other, for Isabella 
Dam hydropower studies. 
29. Includes Code 710 funds and costs for recreation 
facilities: Success Lake: Total to date $747,048. Terminus 
Dam: Total to date $700,004. 
30. Includes $165,000 special recreation use fees and costs 
at Success Lake. 
31. Contributed funds, other, from State of California 
Department of Boating and Waterways and costs for acquisition 
of a boarding float at Success Lake, $30,000 and at 
Terminus Dam, $12,420. 
32. Includes $150,000 contributed funds, other, from the 
Kaweah River Power Authority, Visalia, CA, for Terminus 
Dam hydropower studies. 
33. Includes $127,876 contributed funds, other, costs for 
Terminus Dam hydropower studies. 
34. Includes $110,000 contributed funds, other, from DITT 
Inc., Paris, France, for hydropower studies at Success Lake. 
35. Includes $70,473 contributed funds, other, costs for 
Success Lake hydropower studies. 
36. Includes $3,560,000 contributed funds, from the 
Metropolitan Water District of Salt Lake City for relocation of 
State Highway 65 at Little Dell Lake. 
37. Includes $2,250,170 contributed funds, other, costs for 
relocation of State Highway 65 at Little Dell Lake. 
38. Includes $1,200, initiation of plans and specifications 
for Code 710 recreation facilities, for FY 1978. Construction of 
recreation facilities at Martis Creek Lake under Code 710 was 
determined to be infeasible. 
39. In addition, $66,532 expended for new work from 
contributed funds, other, for miscellaneous construction under 
local cooperation requirements as related to acquisition of 
35-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
rights-of-way and utility alterations for Merced County 
Stream group. 
40. Includes $1,949,968 San Francisco construction funds 
and costs and $260,000 Sacramento general investigation 
funds and costs for Pajaro River. 
41. Includes $21,000 contributed funds, other, from Santa 
Clara Valley Water District for bridge relocation at Pajaro 
River. 
42. Includes Code 710 funds and costs for recreation 
facilities at Pine Flat Lake: Total to date $1,595,100. 
43. Includes Public Works Acceleration, Executive (PL 
87-658) (Transfer to Corps of Engineers, Civil) 1963 funds and 
costs ($239,235) for recreation facilities. 
44. Includes $19,600 Code 713 funds and costs for Pine 
Flat fish barrier. 
45. Includes $158,300 special recreation use fees and costs 
at Pine Flat Lake. 
46. Includes $75,000 maintenance and operation of dam 
funds and costs at Pine Flat Dam. 
47. Miscellaneous construction and engineering and design 
services (non-project) accomplished at expense of State of 
California under local cooperation requirements in connection 
with acquisition of rights-of-way and utility alterations at 
Pine Flat Lake. 
48. Includes unobligated carryover for continuation of 
planning and engineering (CP&E) funds as of September 30, 
1985 ($29,065) and FY 1986 allocation for Redbank and 
Fancher Creeks to be included in project costs (for cost 
sharing) per TWX of September 9, 1985. 
49. Excludes $5,598,000 contributed funds; $400,000 for 
recreation facilities at completed projects funded under 
Public Works Acceleration Program; and $1,628,411 for 
recreation facilities at completed projects funded under Code 
711 at Coyote Valley Dam, Lake Mendocino. 
50. Includes $94,459 special recreation use fees and costs 
(FY 1982-1983), but excludes prior special recreation fees and 
costs for Coyote Valley Dam, Lake Mendocino. 
51. Includes $798,680 maintenance and operation of dam 
funds and costs at Coyote Valley Dam, Lake Mendocino for 
FY 1985, FY 1986 and FY 1987. 
52. Includes $238,411 contributed funds, other, from city 
of Ukiah for Coyote Valley Dam, Lake Mendocino, hydropower 
studies. 
53. Includes $238,357 contributed fund, other, costs for 
Coyote Valley Dam, Lake Mendocino, hydropower studies. 
54. Includes $253,421,793 San Francisco construction 
funds and costs through August 1983 for Dry Creek, Warm 
Springs Dam. 
55. Includes $964,114 San Francisco maintenance funds 
and costs through April 1982 for Dry Creek, Warm Springs 
Dam. 
56. Includes $75,400 maintenance and operation of dam 
funds and costs at Dry Creek, Warm Springs Dam. 
57. Includes $115,000 contributed funds, other, from 
Sonoma County for Dry Creek, Warm Springs, hydropower 
studies. 
58. Includes $104,478 contributed fund, other costs for 
Dry Creek, Warm Springs hydropower studies. 
59. Excludes $614,608 for Table Mountain (Iron Canyon) 
project, deauthorized August 5, 1977, and $531,000 for Sacramento 
River and Major and Minor Tributaries portions which 
are considered inactive and deferred. 
60. Includes Code 710 funds and costs for recreation 
facilities at Black Butte Lake: Total to date $1,000,162. 
61. Includes $104,100 special recreation use fees and costs 
at Black Butte Lake. 
62. Miscellaneous construction and engineering and design 
services (non-project) accomplished at expense of State of 
California under local cooperation requirements in connection 
with acquisition of rights-of-way and utility alterations (primarily 
for Sacramento River and major and minor tributaries 
project). Includes State Highway Commission payment, 
789,008, for use of excess excavation from Chico and Mud 
Creeks and Sandy Gulch (Sacramento River and Major and 
Minor Tributaries) for freeway embankment through city of 
Chico. 
63. Includes $41,984, contributed funds, other, from State 
of California for required modification of existing private 
facilities, Sacramento River, Chico Landing to Red Bluff; 
$15,977 contributed funds, other, from State of California 
Departnment of Boating and Waterways for replacing a 
boarding float at Orland Buttes boat launching ramp at Black 
Butte Lake; and $275,000 contributed funds, other, from the 
city of Santa Clara for hydropower studies at Black Butte 
Lake. 
64. Includes $249,776 contributed funds, other, costs for 
Black Butte hydropower studies. 
65. Includes $8,849,825 San Francisco construction funds 
for Walnut Creek. 
66. Includes $9,049,609 San Francisco construction costs 
for Walnut Creek. 
67. Includes $450,268 San Francisco required contributed 
funds for Walnut Creek. 
68. Includes $525,846 San Francisco required contributed 
costs for Walnut Creek. 
69. Includes $400,348 San Francisco contributed funds, 
other, and contributed fund costs for Walnut Creek. 
70. Includes $425,000 contributed funds, other, from 
Contra Costa Flood Control and Water Conservation District 
for replacement of sewerline in Richmond for Wildcat and 
San Pablo Creeks project. 
71. Excludes funds applicable to other units of this basin 
authorization (Lower San Joaquin River and Tributaries and 
Tuolomne River Basin, California). (See Table 35-E) 
72. Includes $110,000 utilized for preparation of 1957 
Economic Feasibility Report and of Revised Feasibility 
Report (FY 1960, 1961, and 1962) applicable to 1962 reauthorization 
of project. 
73. Contributed funds, other, from the Bureau of Reclamation 
for visitors center at Mark Twain area, New Melones 
lake. 
74. Contributed funds, other, costs for visitors center at 
Mark Twain area, New Melones Lake. 
35-28

SACRAMENTO, CA, DISTRICT 
TABLE 35-A COST AND FINANCIAL STATEMENT 
PRECONSTRUCTION ENGINEERING AND DESIGN 
See 
Section Total Cost to 
in Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep 30, 1987 1 
Cache Creek Basin, New Work 
CA Approp. - 24,336 574,000 640,000 1,238,3362 
Cost - - 375,436 514,136 889,572 
Cottonwood Creek, New Work 
CA Approp. 2,885,000 1,055,000 -50,000 - 15,765,0002 
Cost 3,472,949 1,019,478 17,510 4,979 15,750,447 
Guadalupe River, New Work 
CA Approp. - - 25,000 739,000 764,0002 
Cost - - 16,822 435,345 452,167 
1. Beginning in FY 1982, Advance Engineering and 2. Includes FY 1985 unobligated carryover and FY 1986 
Design (Preconstruction, Engineering and Design) programs allocation for CP&E funds and all AE&D funds to be included 
are funded under General Investigations Appropriations. in project cost (for cost sharing) per TWX of September 9, 
1985. 
35-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 35-B AUTHORIZING LEGISLATION 
See Date 
Section in Authorizing 
Text Act Project and Work Authorized Documents 
Mar. 3, 1899 
July 25, 1912 
Jan. 21, 1927 
Aug. 30, 1935 
Aug. 30, 1935 
Aug. 26, 1937 
July 24, 1946 
Nov. 17, 1987 
Oct. 23, 1962 
Nov. 7, 1966 
May 17, 1950 
Feb. 10, 1956 
Oct. 23, 1962 
Mar. 7, 1974 
21. 
Dec. 22, 1944 
1. 
CORTE MADERA CREEK, CA 
Levees and channel improvements, lower 11 miles of Corte 
Madera Creek and tributaries, as modified by Chief of 
Engineers. 
Local cooperation requirements modified to provide 1.5 
percent cash contribution toward cost of Ross Valley unit. 
RUSSIAN RIVER BASIN, CA 
Coyote Valley Dam (Lake Mendocino): Channel 
improvements on lower 98 miles of Russian River and 
lower reaches of tributaries. 
Increased appropriation authorization for initial stage of 
project development. 
Dry Creek (Warm Springs) Lake; Channel Improvements 
on Dry Creek below dam. 
Dry Creek (Warm Springs) Lake and channel; compensate 
for fish losses on the Russian River which may be 
attributed to the operation of the Coyote Dam 
component of the project through measures such as 
possible expansion of the capacity of the fish 
hatchery at the Warm Springs Dam component of the 
project. 
SACRAMENTO RIVER AND TRIBUTARIES, CA, 
FROM COLLINSVILLE TO SHASTA DAM 
Modify Sacramento River Flood Control Project to provide 
for extensions in levees and other structures along 
Sacramento River and major and minor tributaries; 
construct Black Butte Dam and Reservoir; construct lowlevel 
Table Mountain Dam and Reservoir with power 
H. Doc. 545, 87th Cong., 
2d sess. 
Sec. 204, 1966 Flood 
Control Act. 
H. Doc. 585, 81st Cong., 
2d sess. 
Public Law 404, 84th 
Cong., 2d sess. 
H. Doc. 547, 87th Cong., 
2d sess. 
Sec. 95, 1974 WRDA 
H. Doc. 649, 78th Cong., 
2d sess.2 
35-30 
SACRAMENTO RIVER, CA 
A depth of 7 feet below Sacramento H. Doc. 186, 55th Cong., 
2d sess., and 48, 55th 
Cong., 3d sess. (Annual 
Report 1898, p. 2844 
and 1899, p. 3171). 
For work above Sacramento. H. Doc. 76, 62d Cong., 
1st sess.' 
The 1Q-foot channel up to Sacramento. H. Doc. 123, 69th Cong., 
1st sess. 
A depth of 6 feet between Sacramento and Colusa and 5 feet Rivers and Harbors 
betweeniColusa and Chico Landing, at a cost of $390,000 Committee Doc. 35, 
provided flow of rivers is increased to minimum flow of 73d Cong., 2d sess. 
5,000; cubic feet per second after Shasta Reservoir is built. 
Authority for a special direct participation of Federal Rivers and Harbors 
Government of $12 million in cost of Shasta Reservoir. Committee Doc. 35, 
73d Cong., 2d sess. 
Transfer of authority for expenditure of above $12 million 
from Secretary of War to Secretary of the Interior. 
Modified existing navigation project for Sacramento River, S. Doc. 142, 79th Cong., 
CA, to provide for construction of a ship channel 30 2d sess. 
feet deep and 200 to 300 feet wide from deep water in 
Suisun Bay to Washington Lake, including such works as 
may be necessary to compensate for or alleviate any 
detrimental salinity conditions resulting from ship channel; 
a triangular basin of equal depth, 2,400 by 2,000 by 3,400 
feet at Washington Lake; and connecting channel 13 feet 
deep and 120 feet wide, with lock and drawbridge, thence to 
Sacramento River. 
Deauthorization of shallow-draft channel, Colusa to Red Sec. 1002, 1986 WRDA 
Bluff, feature of project for navigation, Sacramento 
River, California 
20.

TABLE 35-B (Cont'd) 
SACRAMENTO, CA, DISTRICT 
AUTHORIZING LEGISLATION 
See Date of 
Section in Authorizing 
Text Act Project and Work Authorized Documents 
facilities; and provision of monetary authorization of $15 
million for initiation of modification. 
May 17, 1950 Improvement for protection of Upper Butte Basin (included H. Doc. 367, 81st Cong., 
full monetary authorization). 1st sess.2 
July 3, 1958 Extend existing Sacramento River Flood Control Project to H. Doc. 272, 84th Cong., 
Keswick Dam for purposes of zoning area below dam and 2d sess.2 
modification of project by construction of bank protection 
and incidental channel improvements between Chico 
Landing and Red Bluff (included full monetary 
authorization). 
July 3, 1958 Additional authorization of $17 million for comprehensive 
plan approved in act of December 22, 1944. 
July 14, 1960 Further modification of Sacramento River Flood Control S. Doc. 103, 80th Cong., 
Project by construction of initial 10-year phase of 2d sess. 2 
bank erosion control works and setback levees on 
Sacramento River and authorization of $14,240,000 for 
prosecution of modification. 
May 12, 1967 Additional authorization of $7 million for bank protection PL 90-17 
approved in act of July 14, 1960. 
Mar. 7, 1974 Initiation of construction of second phase of bank erosion PL 93-251 
control works and setback levees on Sacramento River as 
approved in act of July 14, 1960, and additional 
authorization of $16 million for such purpose.3 
June 19, 1975 Deauthorization of Table Mountain Dam and Reservoir 4 H. Doc. 94-192, 94th 
Cong., 1st sess. 
1. Contains latest published map of section above Sacramento. 
For map of section below Sacramento, see H. Doc. 
1123, 60th Cong., 2d sess. and S. Doc. 142, 79th Cong., 2d sess. 
2. Contains latest published map. 
3. Total monetary authorization available, exclusive of 
preauthorization studies from general investigations appropriations, 
amounts to $72,740,000. 
4. The 90-day Congressional project review period, required 
by sec. 12, PL 93-251, as amended by sec. 157, PL 
94-587, ended August 5, 1977, and resulted in deauthorization 
of project unit. 
35-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 35-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sep 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Feather River, CA 1951 - 5,7521 2 
Middle River and Connecting 
Channels, CA Completed 1974 8,3543 93,4944 
Mokelumne River, CA Completed 1974 8,500 189,152 
Navajo Reservoir, NM Completed - 2,1325 6 - 
Old River, CA Completed 1970 23,1857 631,128 
Stockton and Mormon Channels, CA Completed 1970 253,1518 218,854 
Suisun Bay Channel, CA Completed 1974 200,9289 10 11 3,316,62212 13 
Suisun Channel, CA Completed 1973 217,677 733,48913 14 
Suisun Point Channel, CA Completed 1965 191,7285 15 
1. Maintenance project, channels adequate for commerce. 
2. Includes $10 for maintenance for previous project. 
Excludes $6,160 for previous project and $3,840 for existing 
project for maintenance expended from contributed funds. 
3. Includes $1,600 for previous project. 
4. Includes $790 for previous project. 
5. Authorized by Chief of Engineers under authority of 
sec. 107, Public Law 86-645, as amended. 
6. All costs transferred from Los Angeles District in FY 
1968.
7. Estimated cost to local interests was $3,600 for lands, 
damages, and public landings. Remaining portion of project, 
consisting of side channel at Orwood and completion of project 
channels from mouth of Old River to Lammers Ferry road 
and from Crocker Cut to Holly Sugar Factory was deauthorized 
November 17, 1986, by WRDA of 1986. 
8. Upon completion of Mormon Slough, Calaveras River, 
CA in February 1970, local interests accepted maintenance 
responsibility for Mormon Slough as well as for Stockton and 
Mormon Channels, CA, and Federal maintenance was discontinued. 
No Federal maintenance costs have been incurred 
since FY 1969. 
9. Includes $58,901 for previous projects. 
10. Excludes $59,551 expended from required contributed 
funds for previous project. 
11. Excludes work accomplished under existing project at 
a cost of $207,198 from Public Works Administration funds 
allotted to San Joaquin River, CA. 
12. Includes $59,817 for previous projects. Excludes $5,449 
expended from required contributed funds for previous 
project. 
13. Maintenance responsibility transferred to San Francisco 
District, January 1, 1974. 
14. Includes reconnaissance and condition surveys of $5,496 
and $483 for fiscal years 1963 and 1964, respectively. 
15. Estimated cost (July 1964) to local interests was 
$12,000 for lands, damages, and spoil retention dikes. 
35-32

SACRAMENTO, CA, DISTRICT 
TABLE 35-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Alameda Creek, CA 
American River, CA 
Aquatic Plant Control, CA 
Big Dry Creek Dam and diversion, CA 
Big Wash, Milford, Beaver County, UT 
Burch Creek, Weber County, UT 
Chester, CA 
Coyote Creek, CA 
Duck Creek, San Joaquin County, CA 
East Weaver Creek, CA 
Folsom Lake, American River, CA 
Green Valley Creek, Solano 
County, CA 
Kays Creek, UT 
Kern River-California Aqueduct 
Intertie, CA 
Klamath River, CA 
Lake Camanche, CA 
Lake Oroville, CA 
Lower San Joaquin River and 
Tributaries, including Tuolumne 
and Stanislaus Rivers, CA 
Marysville Lake, CA 
Merced River, CA 
Middle Creek, CA 
Mormon Slough, CA 
Napa River Basin, CA 
New Bullards Bar, CA 
North Fork, Pit River at Alturas, CA 
Pinole Creek, CA 
Redwood Creek, Humboldt County, CA 
Reese River, Battle Mountain, NV 
Rheem Creek, CA 
Rodeo Creek, CA 
Salinas River, CA 
Salt Lake City, Jordan River, UT 
San Leandro Creek, CA 
San Lorenzo Creek, CA 
San Lorenzo River, CA 
Sevier River near Redmond, UT 
Sonoma Creek, CA 
Truckee River and tributaries, 
CA and NV 
Completed 
Completed 
Completed 
Completed 
Completed 
Active/no FY 87 
expenditure 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Active/no FY 87 
expenditure 
Completed 
Completed 
Completed 
Active/no FY 87 
expenditure 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Inactive 
Completed 
Completed 
Completed 
Completed 
Completed 
Inactive 
Active/no FY 87 
expenditure 
1978 
1959 
1967 
1955 
1961 
1964 
1981 
1968 
1967 
1965 
1957 
1963 
1973 
1977 
1972 
1976 
1981 
1976 
1980 
1976 
1967 
1976 
1979 
1972 
1974 
1968 
1970 
1969 
1962 
1966 
1952 
1961 
1973 
1962 
1966 
1952 
1973 
1968 
26,995,350 
2,125,8183 
1,000 
1,369,9314 
217,8795 6 
26,0496 
3,570,0007 
705,6221 5 
664,8255 8 
220,6361 5 9 
63,014,81010 
136,0265 11 
407,9895 12 
1,503,0735 13 
4,838,000' 
10,252,950'14 
70,425,470's 
27,835,26316 
.17 
10,918,79618 
2,643,49919 
2,965,40220 
2,639,9551 21 
12,890,62522 
904,2785 23 24 
885,7501 5 
4,620,0701 25 
133,3395 26 
400,0001 5 27 
974,1001 5 
94,2131 28 
1,227,57029 
1,000,0001 30 
5,130,8211 31 
4,314,4061 32 
919,00033 
781,5001 34 
1,038,960 
1. Project responsibility transferred from San Francisco 
District to Sacramento District April 1, 1982. 
2. Scheduling of reservoir operations costs. 
3. Excludes $54,919 other contributed funds for miscellaneous 
construction for local interests pursuant to requirements 
of local cooperation. Total costs for all requirements of 
local cooperation were $951,000 (1959) for lands and relocations. 
4. Excludes $44,008 other contributed funds for construction 
in connection with bridge construction pursuant to 
requirements of local cooperation. Total cost to local interests 
for all requirements of local cooperation was $370,000 (1959) 
for lands and relocations. 
5. Authorized by Chief of Engineers under authority of 
sec. 205, Public Law 80-858, as amended. 
6. Excludes $22,000 for preauthorization studies. 
35-33 
54,7781 2 
- -

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 35-E (Cont'd) 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
7. Excludes $69,262 other contributed funds from State 
of California for two low water crossings and appurtenances 
at Chester. 
8. Excludes $50,000 for preauthorization studies. Estimated 
costs to local interests were $665,000 for lands and 
damages including relocations. 
9. Includes $174,938 Public Works Acceleration Program 
Funds. 
10. Transferred to Bureau of Reclamation in May 1956 for 
operation and maintenance by that agency in conjunction 
with other units of Central Valley project. 
11. Excludes $20,000 for preauthorization studies. 
12. Includes $30,000 for preauthorization studies. Estimated 
costs (FY 1973) to local interests for all requirements of 
local cooperation were $150,117 for lands and damages 
including relocations. 
13. Includes $73,000 for preauthorization studies. Non- 
Federal (Kern County Water Agency) cost for road relocation 
was $18,260 (required contributed funds). 
14. Constructed by East Bay Municipal Utility District. 
Final Federal contribution of $51,202 made July 18, 1978 
(total $10,111,684). Non-Federal costs $24,876,842. 
15. Constructed by State of California. Final Federal 
contribution of $64,186 was made on February 9, 1981 (total 
$69,994,015) for flood control reservation. 
16. Cherry Valley and New Don Pedro Reservoirs constructed 
by local interests. Federal contributions of $9,000,000 
and $5,464,000, respectively, for flood control reservation. 
Final Federal contribution of $308,898 was made on January 
18, 1972, for New Don Pedro. Excludes $3,004,946, 
contributed funds, other, for miscellaneous engineering and 
construction (non-project) at local interests expense under 
local cooperation requirements for acquisition of rights-ofway 
for levee and channel improvements on Lower San 
Joaquin River and tributaries. 
17. Planning and any future development is uncertain 
awaiting State of California's position on support of Marysville 
project. 
18. Constructed by Merced Irrigation District. Final 
Federal contribution of $839 was made December 2, 1975 
(total $10,818,638) for flood control reservation. 
19. Estimated costs (FY 1967) to local interests for all 
requirements of local cooperation were $1,340,000 for lands 
and damages including relocations. 
20. Non-Federal cost $2,965,402 (FY 1976) for lands and 
relocations. Federal contribution of $599,336 made to State 
Reclamation Board. 
21. Project was reclassified as "active" on August 3, 1987. 
22. Constructed by Yuba County Water Agency. Final 
Federal contribution of $33,470 was made in FY 1972 (total 
$12,759,127) for flood control reservation. 
23. Includes $41,800 for preauthorization studies. 
24. Excludes $146,000 other contributed funds for miscellaneous 
construction and engineering and design services 
under local cooperation requirements in connection with 
acquisition of rights-of-way, relocation, and utility alterations. 
25. Includes $107,000 costs for remedial work to drainage 
system completed in FY 1977. 
26. Includes $19,000 for preauthorization studies. 
27. Excludes $52,549 contributed funds. 
28. Cost includes engineering and design prior to June 30, 
1952 and costs of $4,288 FY 1962 and 1963 to determine if 
project classification to an active category was justified. 
29. Estimated costs to local interests for all requirements 
of local cooperation were $463,000 (July 1962) for lands and 
damages including relocations. 
30. Excludes $285,329 contributed funds. 
31. Excludes $200,000 estimated value of work performed 
in lieu of cash contribution. 
32. Excludes $421,182 contributed funds. 
33. Excludes $48,000 required contributed funds toward 
first cost. Costs to local interests for all requirements of local 
cooperation, including required contributions, were $118,000 
(1951). 
34. Placed inactive 1974. 
35-34

TABLE 35-G 
SACRAMENTO, 'A, DISTRICT 
DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report For Deauthorized Expended Expended 
Alhambra Creek, CA 1981 1986 300,000 - 
Bear River, CA 1980 1986 
Eel River, CA 1971 1986 1,272,816 - 
Gleason Creek, NV 1977 1986 215,826 - 
Humboldt River and Tributaries, 1982 1986 1,532,932 - 
NV 
Lakeport Lake, CA 1976 1986 2,353,003 - 
Little Valley Wash, Magna, UT 1951 1977 
Mad River Basin, CA 1973 1986 4,243,750 - 
Spanish Fork River, UT 1955 1977 20,000 
Weber River and Tributaries, UT 1974 1972 75,120 
(Morgan County) 
TABLE 35-H SACRAMENTO RIVER, CA: 
TIDAL AND FLOOD CONDITIONS PREVAILING 
(See Section 1 of Text) 
Miles from Range in Feet 
Mouth of Mean Extreme Ordinary Extreme 
Place River Tidal' Tidal2 Flood3 Flood 4 
Collinsville 0 4.3 7 8 10 
Sacramento 59 2.02 3 20 28 
Verona (Mouth of Feather River) 80 - Trace 22 30 
Colusa 144 - - 26 32 
Chico Landing 193 - - 20 25 
Red Bluff 248 - - 24 30 
1. Mean lower low water to mean higher high water. 3. Mean lower low water to flood stage. 
2. Tide at low water season only. 4. Extreme low water to indicated flood condition. 
TABLE 35-I SAN JOAQUIN RIVER, CA: 
TOTAL COST OF NEW WORK FOR PROJECT1 
(See Section 4 of Text) 
Federal Non-Federal 2 
Corps of Coast Required Lands and 
Engineers Guard Cash Damages (includ- Total 
Modification (Construction) (Construction) Contribution ing Relocations) Total Project 
Prior to 1950 Modification $4,009,938 $80,000 $1,307,500 $1,042,000 $2,349,500 $6,439,438 
1950 Modification 1,823,179 - 35,000 135,000 170,000 1,993,179 
Total $5,833,117 $80,000 $1,342,500 $1,177,000 $2,519,500 $8,432,617 
1. Completed in May 1960. 
2. Excludes $5,865,000 (Feb. 1954) local interests costs 
for Stockton Deep Water Channel terminal facilities required 
under terms of project authorization. 
35-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 35-J SAN JOAQUIN RIVER, CA: 
PROJECT UNITS (1950 MODIFICATION) RECLASSIFIED AND EXCLUDED 
FROM PROJECT COST 
(See Section 4 of Text)
Non-Federal 
Federal Required Lands and 
Corps of Cash Damages (includ- Total 
Unit Engineers Contribution ing Relocations) Total Project 
Settling Basin above head of Burns 
Cutoff' $1,073,000 $ 30,000 $ 200,000 $ 230,000 $1,303,000 
Burns Cutoff improvement; new 
turning basin; dredging Mormon 
Channel2 5 7,882,0003 431,000 1,455,000 1,886,000 9,768,000 
Upper Stockton Channel 
enlargement4 5 535,000 34,000 15,000 49,000 584,000 
1. July 1959 price index. Deauthorized August 5, 1977. of San Francisco Bay to Stockton Channel, Sacramento 
2. Deferred; July 1960 price index. District, Improvement No. 3. 
3. For lands and construction. 5. Deauthorized November 17, 1986. 
4. Deleted by 1965 River and Harbor Act authorization 
TABLE 35-K MERCED COUNTY STREAM GROUP, CA, 
MAXIMUM INFLOW, STORAGE, AND OUTFLOW FOR PROJECTS 
(See Section 16 of Text) 
Maximum 
Inflow Maximum Maximum 
(c.f.s.) Storage Outflow 
Stream (bihourly) (acre-feet) (c.f.s.) 
Burns 550 60 520 
Bear 730 100 570 
Owens 50 10 30 
Mariposa 900 530 350 
TABLE 35-L RUSSIAN RIVER BASIN, CA: ESTIMATED 
COST FOR NEW WORK 
(See Section 20 of Text)
Estimated Cost 
Non-Federal 
Project Feature Federal Contribution Total 
Coyote Valley Dam (Lake Mendocino); 
Channel Improvements below Dam 
on lower 98 miles of Russian River $ 14,436,000 $ 5,598,000 $ 20,034,000' 
Dry Creek (Warm Springs) Lake; Channel 
Improvements below Dam 249,600,000 99,520,0002 349,120,000 
Total $264,036,000 $105,118,000 $369,154,000 
1. Exclusive of $1,628,000 for recreation facilities at ment for costs allocated to water supply storage to be paid 
completed projects, over a period not to exceed 50 years after use of storage is 
2. Reimbursement by local interests to Federal Govern- initiated and exclusive of lands and damages. 
35-36

SACRAMENTO, CA, DISTRICT 
TABLE 35-M RUSSIAN RIVER BASIN, CA: PROJECT 
FEATURES AND ESTIMATED COSTS 
(See Section 20 of Text) 
Height of Reservoir 
Nearest City Distance Dam and Capacity Estimated 
Name (California) Above Mouth Type (Acre-Ft) Cost 
Coyote Valley Dam (Lake Ukiah Mile 0.8-East Fork 160 Feet-Earthfill 122,500 $ 17,550,0001 
Mendocino) of Russian River 
Channel Improvement (East Fork Ukiah Mile 0 to 0.8 East - - 2,484,000 
Fork 
below Coyote Valley Dam and Guerneville Mile 0 to 98, Russian 
lower 98 miles of Russian River) River 
Dry Creek (Warm Springs) Lake Healdsburg Mile 14.4 Dry Creek 319 Feet-Earthfill 381,000 345,560,000 
Channel Improvement (Dry Creek) Healdsburg Mile 1 to 14.4 Dry - - 3,444,000 
below Dry Creek (Warm Springs Creek 
Dam) 
1. Exclusive of $1,628,000 for recreation facilities at 
completed projects. 
TABLE 35-N SACRAMENTO RIVER AND TRIBUTARIES, CA, 
COLLINSVILLE TO SHASTA DAM: 
PROJECT UNITS RECLASSIFIED AND EXCLUDED FROM COST ESTIMATE 
(See Section 21 of Text) 
Current Estimated Cost 
Unit Classification Federal Non-Federal' Total 
1944 Modification: 
Antelope Creek2 Inactive $1,400,000 $ 340,000 $1,740,000 
Lower Butte Basin3 Deferred 7,286,000 2,285,000 9,571,000 
Thomes Creek2 Deferred 1,140,000 140,000 1,280,000 
Willow Creek 2 Inactive 1,290,000 120,000 1,410,000 
Bypass Levees 4 Deferred 7,100,000 940,000 8,040,000 
Bypass Levees4 Inactive 3,010,000 - 3,010,000 
1950 Modification: 
Upper Butte Basin2 Deferred 3,530,000 1,787,000 5,317,000 
1. For lands and damages, including relocations. 
2. July 1960 price level. 
3. Excludes work applicable to extension of Moulton 
weir (July 1954 price level). 
4. July 1961 price level. 
35-37

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 35-0 SACRAMENTO RIVER AND TRIBUTARIES, CA, 
FROM COLLINSVILLE TO SHASTA DAM: 
CONSTRUCTION ACCOMPLISHED AND CONTRACT COSTS 
(See Section 21 of Text) 
Required 
Contract Federal Contributed Total 
Contract 38B continuation (Bank protection, 
selected sites, Sacramento River, 
miles 62.6-117.7) 1,765,613 308,867 2,074,480 
Contract 39 completion (Bank protection, 
selected sites, Sacramento River, 
miles 178.0-189.0) -250,000 -250,000 
Contract 40A continuation (Bank protection, 
selected sites, Sacramento River, 
miles 132.4-179.5) 2,750,000 357,216 3,107,216 
Contract 40C initiation (Bank protection, 
selected sites, Sacramento River and 
Sloughs, downstream from Sacramento) 400,000 - 400,000 
35-38

SACRAMENTO, CA, DISTRICT 
TABLE 35-P 
FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION 
FLOOD CONTROL ACTIVITIES PURSUANT TO SECTION 205, 
PUBLIC LAW 80-858, AS AMENDED (PREAUTHORIZATION) 
(See Section 25 of Text) 
Fiscal Year 
Study Stage Cost 
Bear River, Smiths Fork, WY Reconnaissance $ 2,192 
Blacksmith Fork River, Millville, UT 1 Initial Appraisal 1,000 
Cross Creek vicinity, Hanford, CA 1 Initial Appraisal 7,500 
Fourteenmile Slough, Stockton, CA Detailed Project Report 21,389 
Gunnison River near Delta, CO Initial Appraisal 7,500 
Sacramento River near Hamilton City, CA Initial Appraisal 7,500 
Hobble Creek, Springville, UT 1 Initial Appraisal 1,000 
Kaweah River near Visalia, CA 1 Initial Appraisal 7,500 
Logan River near Logan, UT 1 Initial Appraisal 1,000 
North Fork Gunnison River, Paonia, CO Initial Appraisal 7,500 
Papermill Creek, Point Reyes Station, CA 1 Plans and Specifications 2,329 
Plateau Creek near Collbran, CO Initial Appraisal 7,500 
Provo River, Utah County, UT Reconnaissance 29,256 
Roaring Fork River near Basalt, CO Initial Appraisal 7,500 
Rock Canyon Creek, Utah County, UT Initial Appraisal 7,500 
San Joaquin River, Madera County, 
Road 4 Bridge, CA Initial Appraisal 7,495 
San Joaquin River, Madera County, 
Road 9 Bridge, CA Initial Appraisal 7,500 
Tehama, CA Initial Appraisal 7,500 
Truckee River near Lockwood, NV 1 Initial Appraisal 7,500 
Uncompahgre River near Delta, CO Initial Appraisal 7,500 
Uncompahgre River near Ouray, CO Initial Appraisal 7,500 
Weber River near Morgan City, UT Initial Appraisal 1,000 
West Antioch Creek vicinity Antioch, CA Reconnaissance 69,006 
Total 233,167 
1. No further studies recommended. 
35-39

PACIFIC OCEAN DIVISION 
The Pacific Ocean Division is an operating 
division with both district and division functions. 
It's civil works responsibilities encompass the State 
of Hawaii, the Territory of Guam, the Territory of 
American Samoa, and the Commonwealth of the 
Northern Mariana Islands. The division is 
unique in that the area of responsibility is totally 
comprised of islands dispersed over an ocean 
environment exceeding 6 million square miles. 
IMPROVEMENTS 
Navigation Page 
1. Agat Harbor, Guam ................... 36-1 
2. Barbers Point Harbor, Oahu, Hawaii ..... 36-1 
3. Laupahoehoe Harbor, Hawaii, Hawaii ..... 36-2 
4. Nawiliwili Harbor, Kauai, Hawaii ...... 36-2 
5. Reconnaissance and Condition Surveys ... 36-3 
6. Navigation Work Under Special 
Authorization ........................ 36-3 
Erosion Control 
7. Ofu Airstrip, American Samoa .......... 36-3 
8. Beach Erosion Work Under Special 
Authorization......................... 36-3 
Flood Control 
9. Agana River, Guam .................. 36-3 
10. Kahoma Stream, Maui, Hawaii ......... 36-4 
11. Waimea River, Kauai, Hawaii ......... .36-4 
12. Flood Control Work Under Special 
Authorization ........................ 36-4 
13. Inspection of Completed Flood 
Control Projects ...................... 36-5 
Multiple-Purpose Projects, Page 
Including Power 
14. Nanpil River Hydropower, Pohnpei, 
Federated States of Micronesia .......... 36-5 
General Investigations 
15. Surveys ............................ 36-5 
16. Collection and Study of Basic Data ....... 36-5 
Tables 
Table 36-A 
Table 36-B 
Table 36-C 
Table 36-D 
Table 36-E 
Table 36-F 
Table 36-G 
Cost and Financial Statement ... 36-6 
Authorizing Legislation ........ 36-7 
Other Authorized Navigation 
Projects ..................... 36-8 
Other Authorized Beach 
Erosion Control Projects........ 36-10 
Other Authorized Flood 
Control Projects............... 36-11 
Not Applicable 
Deauthorized Projects.......... 36-12 
Navigation 
1. AGAT HARBOR, GUAM 
Location. On the southwestern coast of the island 
of Guam, about 3,318 miles west of Honolulu, 
Hawaii. (See NOAA Chart 81408.) 
Existing project. For a description of the existing 
project,- see -page 36-1 of the FY86 Annual Report. 
Local cooperation. Requirements are described 
in full on page 36-1 of the FY86 Annual Report. 
Terminal facilities. None. 
Operations during fiscal year. New Work: A 
construction contract was awarded in October 1986 
for $3,170,000, with completion scheduled in August 
1988. Construction is approximately 24% complete 
as of September 30, 1987. 
2. BARBERS POINT HARBOR, OAHU, 
HAWAII 
Location. On the west coast of Oahu, about 25 
miles from metropolitan Honolulu. (See Coast and 
Geodetic Survey Charts 4110 and 4133.) 
36-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Existing project. For a description of the existing 
project, see page 36-1 of the FY84 Annual Report. 
Total project cost estimate is $63,600,000 of which 
Federal cost is $55,300,000 (including $372,500 in 
U.S. Coast Guard cost) and non-Federal cost is 
$8,300,000 including lands and rights-of-way and 
cash contribution of $2,500,000. (See Table 36-B for 
Authorizing Legislation.) 
Local cooperation. Requirements are described 
in full on page 36-1 of the FY85 Annual Report. 
Terminal facilities. See page 36-2 of the FY84 
Annual Report. 
Operations during fiscal year. Work remaining 
to be completed includes completion of plans and 
specifications for project beautification and 
stockpile plantings estimated at $1,348,000. Plans 
and specifications for project beautification are 
approximately 85 percent completed as of September 
30, 1987. Remaining work is scheduled for 
completion in mid 1989. Maintenance: Annual 
operational cost for the Regional Visitor Center 
located at Fort DeRussy was $38,497. 
3. LAUPAHOEHOE HARBOR, 
HAWAII, HAWAII 
Location. Laupahoehoe is located on a peninsula 
on the northeast coast of the island of Hawaii, about 
25 road miles northwest of Hilo. (See NOAA Chart 
19320.) 
Existing project. The project provides for 
construction of a 200 foot long breakwater, a 60 foot 
long wave absorber, a 9.5 foot deep entrance 
channel, and a 7,5 foot deep turning basin. The 
estimated first cost of the project is $3,762,000 for 
which Federal cost is $3,297,000 (including $12,000 
in U.S. Coast Guard cost) and non-Federal cost of 
$465,000. Project authority is Section 107 of the 
River and Harbor Act of 1960, as amended. Project 
was authorized for construction in May 1987. 
Local cooperation. The Local Sponsor has agreed 
to:
(a) Construct, operate, and maintain at its own 
expense, all those non-Federal features necessary 
to insure a complete and adequate Project. These 
features are identified and described in the Final 
Detailed Project Report and Environmental Impact 
Statement. 
(b) Provide without cost to the Government all 
lands, easements, and rights-of-way, including 
suitable borrow and dredged material disposal 
areas, as may be determined by the Chief of 
Engineers to be necessary for construction of the 
Project. Prior to the advertisement of any 
construction contract, the Local Sponsor shall 
furnish to the Government rights-of-entry to all 
lands required for the Project, together with 
evidence supporting the Local Sponsor's legal 
authority to grant such rights-of-entry. 
(c) Accomplish without cost to the Government 
all alterations and relocations, including 
buildings, streets, storm drains, utilities, and other 
structures and improvements required for the 
Project. 
(d) Provide or pay to the Government the full 
cost of providing, all retaining dikes, wasteweirs, 
bulkheads, and embankments, including all 
monitoring features and stilling basins, 
determined by the Government to be necessary for 
construction, operation or maintenance of the 
general navigation features. 
(e) Comply with the applicable provisions of the 
Uniform Relocations Assistance and Real Property 
Acquisition Policies Act of 1970, Public Law 91-646, 
approved January 2, 1971, in acquiring lands, 
easements, and rights-of-way for construction and 
subsequent operation and maintenance of the 
Project, and inform all affected persons of 
applicable benefits, policies, and procedures in 
connection with said Act. 
(f) Provide during the period of construction a 
cash contribution equal to 10 percent of the "Total 
Cost of Construction of the General Navigation 
Facilities." This cash contribution is currently 
estimated at $365,000. In no instance shall the 
Government's share of project costs, including 
costs of preauthorization planning, exceed 
$4,000,000, the funding limit imposed by Section 107 
of the River and Harbor Act of 1960, as amended. 
The Local Sponsor shall assume full responsibility 
for all such project costs in excess of $4,000,000. 
(g) Repay with interest over a period of 30 years 
following completion of the Project, an additional 
0-10 percent of the "Total Cost of Construction of 
General Navigation Facilities," depending on the 
value as calculated under Article IV of the Local 
Cooperation Agreement dated June 29, 1987. 
Terminal facilities. The current facility 
includes a single lane, concrete paved launch 
ramp, roadways and parking areas. 
Operations during fiscal year. New Work: 
Plans and specifications were completed in July 
1987. A Local Cooperation Agreement in 
conformance with Section 221 of the Flood Control 
Act of 1970 and the Water Resources Development 
Act of 1986 was executed in June 1987. A 
construction contract is scheduled for award in 
November 1987. 
4. NAWILIWILI HARBOR, KAUAI, 
HAWAII 
Location. On the southwest coast of the island of 
Kauai and about 100 nautical miles northwest of 
Honolulu. (See NOAA Chart 19383.) 
Existing project. For a description of the existing 
36-2 
_ I I~ _ ___ _ II)- ----CILI---

PACIFIC OCEAN DIVISION 
project, see page 36-3 of the FY84 Annual Report. 
(See Table 36-B for Authorizing Legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. See page 36-3 of the FY84 
Annual Report. 
Operations during fiscal year. Maintenance: A 
construction contract for repair of the breakwater 
was awarded in May 1986 for $3,303,000 and 
physically completed in July 1987. Financial 
completion is pending. 
5. RECONNAISSANCE AND 
CONDITION SURVEYS 
Condition surveys were conducted at Haleiwa 
Small Boat Harbor, Oahu; Hilo Harbor, Hawaii; 
Kaunakakai Small Boat Harbor, Molokai; 
Kawaihae Small Boat Harbor, Hawaii; and Rota 
Harbor, CNMI, in February 1986 by the Portland 
District for $28,596. 
6. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Section 107, 
Public Law 86-645. Preauthorization studies were 
continued on Merizo Harbor, Guam, $26,494; East 
Molokai, Molokai, $3,081; and Kahului Small Boat 
Harbor, Maui, $21,125; initiated on Kaumalapau 
Harbor, Lanai, $21,095; and terminated on 
Kukuiula Boat Harbor, Kauai, $50,000. 
Beach Erosion Control 
7. OFU AIRSTRIP, AMERICAN 
SAMOA 
Location. On the southern end of the island of 
Ofu, about 2,300 miles southwest of Honolulu, 
Hawaii. (See Coast and Geodetic Survey Chart 4190, 
Manua Islands.), 
Existing project. For a description of the existing 
project, see page 36-3 of the FY86 Annual Report. 
Local cooperation. Fully complied with. 
Operations during fiscal year. New Work: A 
construction contract, awarded in August 1986, was 
completed in October 1986 for $149,000. 
8. BEACH EROSION WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency streambank and shoreline protection 
activities pursuant to Section 14, Public Law 79-526. 
Preauthorization studies were initiated and 
terminated on Aunuu Shoreline (School), 
American Samoa, $1,000, and Ofu Airfield (West 
End), American Samoa, $2,000; initiated on Saipan 
Beach Road, Northern Marianas, $8,753; and Kihei 
Shoreline, Maui, $7,056 
Beach erosion control activities pursuant to 
Section 103, Public Law 87-874. 
Preauthorization studies were initiated on 
Amouli to Tula, Tutuila, American Samoa, $227; 
Nua to Amaluia, Tutuila, American Samoa, $227; 
Tua to Faleasao, Tau, American Samoa, $227; and 
Lauliifou to Aumi, Tutuila, American Samoa, $227. 
Plans and specifications were initiated on Lepua 
Area, American Samoa, $24,966; and terminated on 
Sand Island Shore Protection, Oahu, $402. Plans 
and specifications for Masefau Bay, American 
Samoa, will be completed under emergency 
streambank and shoreline protection, Section 14, 
Public Law 79-526. 
Flood Control 
9. AGANA RIVER, GUAM 
Location. The Agana River basin and the City of 
Agana are located on the western end of the Island 
of Guam near the center of the Island. The 
Territory of Guam is located approximately 3,800 
statute miles west of Honolulu. (See NOAA Chart 
81048). 
Existing project. The existing project consists of 
a levee system and channel improvements 
extending seaward to Agana Bay. The plan 
consists of 1,300 feet of concrete-lined channel, 410 
feet of riprap and unlined channel, 850 feet of earth 
levee, 1,700 feet of floodwall, interior drainage 
improvements, minor modifications to the Marine 
Drive Bridge,- and a new bridge/culvert at the 
Saylor Street crossing.; The estimated cost of the 
project is $5,280,000 for which the Federal cost is 
$4,090,000 and non-Federal cost of $1,190,000. The 
project was authorized by Section 401 of the Water 
Resources Development Act of 1986, PL 99-662 dated 
November 17, 1986. 
Local cooperation. The local sponsor has agreed 
to:
(a) Provide during the period of construction, a 
cash contribution of 5 percent of the total project 
costs. Total project costs are currently estimated to 
be $5,280,000 of which an estimated $1,130,000 will 
be in the form of lands, easements, rights-of-way, 
and utility and facility alterations and relocations. 
The local sponsor must provide a total cash 
contribution presently estimated to be $64,000. 
(b) Provide all lands, easements, rights-of-way, 
and dredged material disposal areas, and perform 
all relocations and alterations of buildings, 
utilities, highways, railroads, bridges, sewers, and 
36-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
related and special facilities determined by the 
Government to be necessary for construction of the 
project. 
(c) Publicize floodplain information in the 
area concerned and shall provide this information 
to zoning and other regulatory agencies for their 
guidance and leadership in preventing unwise 
future development in the floodplain and in 
adopting such regulations as may be necessary to 
ensure compatibility between future development 
and protection levels provided by the project. 
(d) To the extent of its powers, prescribe and 
enforce regulations to prevent obstruction of or 
encroachment on the project that would reduce the 
level of protection it affords or that would hinder 
operation and maintenance. 
(e) Prior to the advertisement of any 
construction contract, the local sponsor shall 
furnish to the Government all lands, easements, 
and rights-of-way, including suitable borrow and 
dredged material disposal areas, as may be 
determined by the Government to be necessary for 
construction of the project. 
(f) Provide or pay to the Government the full 
cost of providing all retaining dikes, wasteweirs, 
bulkheads, and embankments, including all 
monitoring features and stilling basins, 
determined by the Government to be necessary for 
construction of the project. 
(g) Upon reasonable notification from the 
Government, the Local Sponsor shall accomplish or 
arrange for accomplishment at no cost to the 
Government of all alterations and relocations of 
buildings, highways, railroads, bridges (other than 
railroad bridges), storm drains, utilities, 
cemetaries, and other facilities, structures, and 
improvements determined by the Government to be 
necessary for construction of the project. 
(h) The Local Sponsor shall comply with the 
applicable provisions of the Uniform Relocations 
Assistance and Real Property Acquisition Policies 
Act of 1970, Public Law 91-646, approved January 2, 
1971, in acquiring lands, easements, and rights-ofway 
for construction and subsequent operation and 
maintenance of the Project, and inform all affected 
persons of applicable benefits, policies, and 
procedures in connection with said Act. 
(i) Operate, maintain, replace, and rehabilitate 
the project in accordance with regulation or 
directions prescribed by the Government. 
(j) The Local Sponsor hereby gives the 
Government a right to enter, at reasonable times 
and in a reasonable manner, upon land which it 
owns or controls for access to the project for the 
purpose of inspection, and, if necessary for the 
purpose of completing, operation, repairing, 
replacing, maintaining, or rehabilitating the 
project. 
Terminal facilities. None. 
Operations during fiscal year. New Work: 
Plans and specifications were initiated in October 
1986 and is approximately 8 percent complete as of 
September 30, 1987. A construction contract is 
scheduled for award in March 1988. 
10. KAHOMA STREAM, MAUI, HAWAII 
Location. Kahoma Stream drainage basin is 
located in Lahaina, Maui. Lahaina is on the west 
coast of Maui about 4 miles from Kaanapali. The 
drainage basin of Kahoma Stream totals 5.3 square 
miles. (See NOAA Chart 19348.) 
Existing project. For a description of the existing 
project, see page 36-5 of the FY84 Annual Report. 
Total project cost estimate is $17,200,000 of which 
Federal cost is $10,840,000 and non-Federal cost is 
$5,500,000 for lands, damages, relocations, and a 
cash contribution of $860,000. (See Table 36-B for 
Authorizing Legislation.) 
Local cooperation. Requirements are described 
in full on page 36-4 of the FY86 Annual Report. 
Operations during fiscal year. New Work: 
Local Cooperation Agreement was executed in June 
1986. A construction contract was awarded in 
September 1986 for $12,180,000 with completion 
scheduled in July 1989. Construction is 
approximately 19% complete as of September 30, 
1987. 
11. WAIMEA RIVER, KAUAI, HAWAII 
Location. On the west-central portion of the 
island of Kauai which is about 103 statute miles 
northwest of Honolulu. (See NOAA Chart 19381.) 
Existing project. For a description of the existing 
project, see page 36-4 of the FY86 Annual Report. 
Local cooperation. Requirements are described 
in full on page 36-8 of the FY82 Annual Report. 
Operations during fiscal year. Work remaining 
to be completed includes the flood warning system, 
estimated at $300,000, upon receipt of non-Federal 
funds. 
12. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to Section 205, 
Public Law 80-858. 
Preauthorization studies were continued on 
Vaipito Stream, American Samoa, $28,669; initiated 
on Malaeloa Stream, American Samoa, $4,319; 
Mapusagatuai Stream, American Samoa, $3,828; 
completed on Garapan Area, Northern Marianas, 
$388; terminated on Fagatogo Stream, American 
Samoa, $15,000; Leafu Stream, American Samoa, 
36-4 
_ _C I _ I ___ I _ IC _ I _____~_ _I C ___ __ I__ _ __ ____ _ _ _ _1_1_1_ ~_ II __~__ _

PACIFIC OCEAN DIVISION 
$10,000; and Vaitele Stream, American Samoa, 
$10,000. Plans and specifications were continued 
on Kahawainui Stream, Oahu, $65,805; and 
initiated on Garapan Area, Northern Marianas, 
$107,322; Lake Susupe, Northern Marianas, $90,365. 
Emergency flood control activities pursuant to 
Public Law 84-99. 
Federal cost during the fiscal year for Flood 
Control and Coastal Emergencies appropriation 
was $158,251 for disaster preparedness. 
13. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Inspections were conducted on Asan River, 
Guam, in April 1987; Hanapepe River, Kauai, in 
October 1986 and April 1987; Iao Stream, Maui, in 
November 1986; Kaneohe-Kailua Dam in October 
1986; Kawainui Swamp, Oahu, in October 1986; 
Kaunakakai Stream, Molokai, in November 1986; 
Kuliouou Stream, Oahu, in October 1986; Namo 
River, Guam, in April 1987; Paauau Stream, 
Hawaii, in October 1986; Wailoa Stream, Hawaii, 
in October 1986; and Waimea River, Kauai, in 
October 1986 for a total cost of $11,421. 
Multiple-Purpose Projects Including Power 
14. NANPIL RIVER HYDROPOWER, 
POHNPEI, FEDERATED STATES 
OF MICRONESIA 
Location. Nanpil River is located on the island 
of Pohnpei in the Federated States of Micronesia. 
(See State of Hawaii, the New Pacific map.) 
Existing project. For a description of the existing 
project see page 36-4 of the FY85 Annual Report. 
(See Table 36-B for Authorizing Legislation.) 
Local cooperation. Requirements are described 
in full on Page 36-5 of the FY85 Annual Report. 
Operations during fiscal year. A construction 
contract for $5,622,000 was awarded in October 1985 
with completion scheduled in November 1987. A 
contract to operate and maintain the project for a 
one-year period to October 1988 is incorporated in 
the work to be done. Construction is approximately 
95% completeas of September 30, 1987. 
General Investigations 
15. SURVEYS 
Fiscal year costs were $729,964 of which $288,244 
was for navigation studies, $215,897 for flood 
damage prevention studies, $5 for review of 
authorized projects, $69,947 for miscellaneous 
activities, and $155,871 for coordination with other 
agencies. 
16. COLLECTION AND STUDY OF 
BASIC DATA 
Flood plain management services. Flood Plain 
Management Services Program comes under 
Section 206, PL 86-645, 1960 Flood Control Act, as 
amended. Through technical services and 
planning guidance, the program provides 
information on floods and flood related 
information to improve planning for the careful 
use of the nation's flood plains, thereby reducing 
the potential for losses to life and property from 
floods and wave actions. Federal and non-federal 
agencies and the private sector are assisted with 
flood hazard evaluation and planning information 
for flood and coastal hazard areas. This 
assistance is in the form of local flood plain 
regulations, National Flood Insurance 
requirements, and Executive Order 11988 
requirements for federal agencies. Such 
assistance may include flood information and 
timing, flood-water velocity, extent of flooding, 
duration of flooding, flood frequency and 
regulatory floodway limits. 
Services accomplished during fiscal year. 
Requests and responses for technical services and 
planning assistance totaled 532. Of this total, 141 
were from other federal agencies, 127 from nonfederal 
agencies, and. 264 from individuals, 
realtors, corporations, lending institutions, 
engineers, architects and others. Of the 532 
requests, assistance resulted in 1,189 site specific 
responses. Costs for providing Flood Plain 
Management services during fiscal year were 
$217,258. 
Hydrologic Studies. Storm studies cost was 
$5,001. Total costs for collection and study of basic 
data during the fiscal year were $222,227. 
36-5 
ICU-PD~I P I I ~-- P~IIlPsl~ E --- - -~----I--- --- -~ ---- --n--l-~-u-~ --- - ------~----------- Ir-ur-- l----I U~1 -Y ~~.---~-- -.---r~ar---l ; 

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 36-A COST AND FINANCIAL STATEMENT 
See Total Cost 
Section To 
In Text Project Funding FY 84 FY 85 FY 86 FY 87 Sept. 30, 1987 
1. Agat Harbor, Guam 
(Federal Funds) 
2. Barbers Point 
Harbor, Oahu, HI 
(Federal Funds) 
(Contributed 
Funds) 
3. Laupahoehoe Harbor, 
Hawaii, Hawaii 
(Federal Funds) 
4. Nawiliwili Harbor, 
Kauai, Hawaii 
(Federal Funds) 
(Contributed 
Funds) 
7. Ofu Airstrip, 
American Samoa 
(Federal Funds) 
9. Agana River, Guam 
(Federal Funds) 
10. Kahoma Stream, 
Maui, Hawaii 
(Federal Funds) 
New Work 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
35,000 
9,771 
16,500,000 
14,346,100 
567,464 
673,952 
55,950 
37,343 
18,800 
41,838 
11,827,000 
8,348,616 
374,434 
376,920 
155,000 
158,604 
52,000 
52,808 
-4,155,000 
1,485,293 
58,485 
68,000 
76,793 
1,196,000 1,590,300 
385,532 778,449 
-200,000 53,545,500 
-87,348 53,238,659 
--- 4,249,670 
110,159 2,383,440 
22,000 
26,172 
428,450 
424,687 
--- 2,127,724 
--- 2,127,724 
-25,000 
34,328 
85,000 
53,775 
480,000 
511,030 
3,228,000 9,518,220 
2,920,372 9,210,391 
--- 233,261 
--- 233,261 
32,000 
7,000 
160,000 
25,461 
-2,500 
157,039 
--- 250,000 
--- 117,422 
10,000 
10,315 
20,000 
10,009 
87,000 
82,959 
189,500 
189,500 
250,000 
117,422 
5,800,000 6,656,000 
2,350,275 3,192,217 
(Contributed 
Funds) 
11. Waimea River, 
Kauai, Hawaii 
(Federal Funds) 
14. Nanpil River 
Hydropower, 
Pohnpei, FSM 
(Federal Funds) 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
-69,600 
2,180,214 
60,000 
9,188 
405,000 
462,599 
114,000 
145,350 
-130,000 
14,251 
6,000,000 
1,786,232 
--- 2,917,400 
2,742 2,917,311 
530,000 6,704,000 
4,090,598 6,031,368 
36-6 
Contrib. 
Cost 
416,550 
104,911 
416,550 
104,911 
- -- --

PACIFIC OCEAN DIVISION 
TABLE 36-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Oct. 27, 1965 
Mar. 2, 1919 
Sep. 3, 1954 
Dec. 31, 1970 
Nov. 17, 1986 
Oct. 22, 1976 
Mar. 20, 1980 
Dec 8, 1983 
2. 
Appropriation of funds for a feasibility study 
and construction of a hydroelectric project. 
Sec. 2, PL 98-213 
36-7 
BARBERS POINT HARBOR, OAHU, HAWAII 
An entrance channel 42 feet deep, 450 feet wide, and H. Doc. 93, 89th Cong., 
3,100 feet long; an inshore basin of about 46 acres, 1st sess. 
28 feet deep, a breakwater on the north side of the 
entrance channel, if model study shows it to be necessary; 
spending beaches with wave absorbers within the harbor 
totaling 1,320 feet in length; and a main access channel 
12 feet deep, 80 feet wide, and 1,200 feet long to a smallboat 
harbor on the west side of the deep-draft harbor to 
be developed by local interests. 
NAWILIWILI HARBOR, KAUAI, HAWAII 
An entrance channel 35 feet deep; a harbor basin H. Doc. 609, 62nd Cong., 
1,100 feet wide, 35 feet deep, and about 1,950 feet long; 2nd sess., as modified 
and a rubble-mound breakwater. by Chief of Engineers. 
Deepening entrance channel to 40 feet; enlarging H. Doc. 453, 83 Cong., 
harbor basin; and constructing a revetted-fill area. 2nd sess. (Contains 
(Modified bythe Chief of Engineers.) latest published maps. 
Modification of General Navigation features. River and Harbor Act. 
AGANA RIVER, GUAM 
A levee system and channel improvements Sec 401, PL 99-662 
extending seaward consisting of 1,300 feet of 
concrete-lined channel, 410 feetof riprap and unlined 
channel, 850 feet of earth levee, 1,700 feet of floodwall, 
interior drainage improvements, minor modifications 
to the Marine Drive Bridge and a new bridge at the 
Saylor Street crossing. 
KAHOMA STREAM, MAUI, HAWAII 
A debris basin 100 feet wide and 700 feet long with a H. Doc 94-488, 94th 
capacity of 22,000 cubic yards; a rock sill, a diversion Cong.,2nd sess. 
levee which is 80 feet long to direct flows into the 
concrete channel; a concrete trapezoidal channel about 
5,280 feet long; three concrete bridges with clear span of 
50 feet; and revetted outlet extending 70 feet seaward of 
the stream mouth. 
NANPIL RIVER HYDROPOWER, POHNPEI, FSM 
Construction of a hydroelectric power facility. Sec. 101, PL 96-205 
4. 
9. 
10. 
14. 
c -- "-~ -II~ --~- II I

REPORT OF THE SECRETARY' OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 36-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to September 30,1987 
Full Report 
See Annual Operations and 
Project Status Report for* Construction Maintenance 
Agana Small Boat Harbor, Guam 
Auasi Harbor, American Samoa 
Aunuu Harbor, American Samoa 
Haleiwa Small Boat Harbor, Oahu, Hawaii 
Heeia-Kea Small Boat Harbor, Oahu, 
Hawaii 
Hilo Harbor, Hawaii, Hawaii 
Honokohau Small Boat Harbor, 
Hawaii, Hawaii 
Honolulu Harbor, Oahu, Hawaii 
Kahului Beach Road, Maui, Hawaii 
Kahului Harbor, Maui, Hawaii 
Kailua Small Boat Harbor, Oahu, Hawaii 
Kalaupapa Harbor, Molokai, Hawaii 
Kaulana Bay Boat Harbor, Hawaii, Hawaii 
Kaunakakai Harbor, Molokai, Hawaii 
Kawaihae Harbor, Hawaii, Hawaii 
KeehiLagoon, Oahu, Hawaii 
Kikiaola Small Boat Harbor, Kauai, Hawaii 
Lahaina Small Boat Harbor, Maui, Hawaii 
Maalaea Small Boat Harbor, Maui, Hawaii 
Manele Bay Small Boat Harbor, 
Lanai, Hawaii 
Maunalua Bay Small Boat Harbor, 
Oahu, Hawaii 
Nawiliwili Small Boat Harbor, 
Kauai, Hawaii 
Ofu Small Boat Harbor, American Samoa 
Pohoiki Bay, Hawaii, Hawaii 
Port Allen Harbor, Kauai, Hawaii 
Reeds Bay Small Boat Harbor, 
Hawaii, Hawaii 
Rota Harbor, Northern Marianas 
Saipan Small Boat Harbor, 
Northern Marianas 
Tau Small Boat Harbor, American Samoa 
Waianae Small Boat Harbor, Oahu, Hawaii 
Welles Harbor, Midway Island 
Completed 
Completed 
Completed 
Completed 
Deferred 
1978 
1982 
1982 
1978 
1972 
$ 937,798 
1,033,015 
1,783,129 
527,047 
1,481 
Completed 1982 
Completed 1971 
Completed 
Completed 
Completed 
Deferred 
Completed 
Deferred 
Deferred 
Active 
Completed 
Active 
Inactive 
Active 
Completed 
Deferred 
5,423,440 
781,036 
16,044,095 
751,867 
7,203,221 
157,997 
159,400 
138,188 
5,983,501 
3,348,000 
193,000 
186,937 
195,000 
372,000 
1985 
1976 
1984 
1967 
1968 
1986 
1966 
1981 
1956 
1981 
1977 
1981 
1986 
1972 
Completed 1976 
Completed 
Completed 
Completed 
Active 
1976 
1979 
1984 
1967 
Completed 1985 
Active 1982 
Completed 
Completed 
Completed 
1985 
1979 
1950 
1
2
3
4 
11,196 
27,920 
208,902 
3,680,856 
5 63,693 
6 2,038,271 
7
8 6,738,020 
9 3,127 
292,441 
10 61,800 
11 41,857 
12 423,622 
30,378 
584,513 13 
980,018 
432,523 
752,645 
2,000,000 
194,000 
1,991,569 
1,940,011 
2,448,056 
30,707 
668,354 
884,833 
14 
15 
16 
17 
18 
19 
20 
21 
65,000 
92,767 
2,111 
36-8

PACIFIC OCEAN DIVISION 
TABLE 36-C 
(Continued) 
OTHER AUTHORIZED NAVIGATION PROJECTS 
1Authorized by the Chief of Engineers and 
completed in October 1977. In addition, Contributed 
Funds of $282,474 forConstruction. 
2 Authorized by the Chief of Engineers and 
completed in February 1982. In addition, 
Contributed Funds of $86,563 for Construction. 
3 Authorized by the Chief of Engineers and 
completed in February 1982. In addition, 
Contributed Funds of $231,437 for Construction. 
4 Authorized by the Chief of Engineers and 
completed in November 1975. In addition, 
Contributed Funds of $410,077 for Construction and 
$84,388 for Operation and Maintenance. 
5 Completed in March 1970. In addition, 
Contributed Funds of $630,568 for Construction. 
6In addition Contributed Funds of $201,282 for 
Construction. 
7Authorized by the Chief of Engineers and 
completed in April 1976. 
8In addition, Contributed Funds of $30,200 for 
Construction. 
9Authorized by the Chief of Engineers and 
completed in September 1967. 
10In addition, Contributed Funds of $62,102 for 
Construction. 
1 1Abandonment authorized by R & H Act of 1965 
(HD 98, 89th Congress, 1st Session). 
1 2In addition, Contributed Funds of $370,845 for 
Construction. 1 3 Authorized by the Chief of Engineers and 
completed in November 1974. In addition, 
Contributed Funds of $405,471 for Construction. 
1 4Authorized by the Chief of Engineers and 
completed in August 1975. In addition, Contributed 
Funds of $61,953 for Construction. 
1 5Authorized by the Chief of Engineers and 
completed in April 1979. 
16In addition, Contributed Funds of $200,000 
for Construction. 
1 7 Reclassified from deferred to active category on 
May 16, 1983. 
1 8Authorized by the Chief of Engineers and 
completed in March 1985. In addition, Contributed 
Funds of $774,373 for Construction. 
19Authorized by the Chief of Engineers and 
completed in April 1985. In addition, Contributed 
Funds of $54,034 for Construction. 
2 0 In addition, Contributed Funds of $1,791,068 for 
Construction. 
21Completed in 1941 and Maintenance 
transferred to Department of Navy. 
36-9 
_ ___

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 36-D OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
For Last Cost to September 30,1987 
Full Report 
See Annual Operations and 
Project Status Report for: Construction Maintenance 
Afono Area and Aoa Area, American Samoa Completed 1978 $ 254,015 1 $ 
Asquiroga Bay, Guam Completed 1986 227,181 2 
Haleiwa Beach, Oahu, Hawaii Completed 1967 240,148 3 
Kaaawa Beach, Oahu, Hawaii Completed 1976 176,488 4 
Kapaa Town, Kauai, Hawaii Completed 1977 158,916 5 
Kekaha Beach, Kauai, Hawaii Completed 1981 999,996 6 
Kihei Beach, Maui, Hawaii Completed 1972 154,313 7--- 
Kualoa Regional Park, Oahu, Hawaii Terminated 1982 355,472 8 
Matafao Shoreline, American Samoa Completed 1984 225,000 9 
Pago Pago Airport, American Samoa Completed 1984 174,941 10 
Pago Pago to Nuuuli, American Samoa Active 1978 394,187 -- 
Poloa Area, American Samoa Completed 1978 136,040 12 
Sand Island, Oahu, Hawaii Completed 1981 301,879 13 
Vatia Area, American Samoa Completed 1978 154,309 14- 
Waikiki Beach, Oahu, Hawaii Active 1979 729,087 15 108,060 
1Authorized by the Chief of Engineers and 
completed in October 1977. In addition, $209,549 in 
Contributed Funds. 
2 Authorized by the Chief of Engineers and 
completed in December 1985. 
3Completed in April 1965. In addition, $160,098 in 
Contributed Funds. 
4 Authorized by the Chief of Engineers and 
completed in April 1975. In addition, $97,075 in 
Contributed Funds. 
5 Authorized by the Chief of Engineers and 
completed in September 1976. In addition, $56,916 
in Contributed Funds. 
6 Authorized by the Chief of Engineers and 
completed in December 1980. In addition, $1,672,524 
in Contributed funds. 
7 Authorized by the Chief of Engineers and 
completed in December 1980. In addition, $1,672,524 
in Contributed Funds. 
8 Authorized by the Chief of Engineers and 
terminated in April 1980 as a Circuit Court ruled 
sand mining to be illegal. In addition, $177,300 in 
Contributed Funds. 
9 Authorized by the Chief of Engineers and 
completed in June 1984. 
1 0Authorized by the Chief of Engineers and 
completed in June 1984. 
11Authorized by the Chief of Engineers and 
completed in September 1978. In addition, $312,480 
in Contributed Funds. 
1 2Authorized by the Chief of Engineers and 
completed in October 1977. In addition, $101,547 in 
Contributed Funds. 
13 Authoried by the Chief of Engineers and 
completed in April 1981. In addition, $255,728 in 
Contributed Funds. 
14Authorized by the Chief of Engineers and 
completed in October 1977. In addition, $132,075 in 
Contributed Funds 
1 5In addition $82,000 in Advanced Funds and 
$17,640 in Contributed Funds. 
36-10

PACIFIC OCEAN DIVISION 
TABLE 36-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to September 30,1987 
Full Report 
See Annual Operations and 
Project Status Report for* Construction Maintenance 
Asan Village, Guam Completed 1986 $ 1,275,500 1 $ 
Hanapepe River, Kauai, Hawaii Completed 1967 784,867 2 
Iao Stream, Maui, Hawaii Completed 1985 12,285,000 3 
Kaneohe-Kailua Area, Oahu, Hawaii Completed 1985 25,552,400 4 
Kaunakakai Stream, Molokai, Hawaii Completed 1950 73,478 5 
Kawainui Swamp, Oahu, Hawaii Completed 1967 1,265,567 6 
Kuliouou Stream, Oahu, Hawaii Completed 1971 1,000,000 7 
Namo River, Guam Completed 1982 2,416,314 8 
Paauau Stream, Hawaii Completed 1985 1,978,514 9 
Wailoa Stream and Tributaries, Completed 1966 1,044,888 10 
Hawaii, Hawaii 
1Completed in December 1985. 
2 Completed in November 1966. In addition, 
$11,953 in Contributed Funds. 
3Completed in November 1983. 
4 Completed in October 1984. Includes Non- 
Federal reimbursement of recreation construction 
cost of $5,668,300. In addition, $8,175 in Contributed 
Funds. 
5 Authorized by the Chief of Engineers and 
completed in December 1950. 
6Completed in August 1966. 
7 Authorized by the Chief of Engineers and 
completed in February 1970. In addition, $540,335 
in Contrubuted Funds. 
8 Authorized by the Chief of Engineers and 
completed in April 1982. 
9 Completed in September 1985. 
10 Completed in August 1965. 
36-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 36-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Date Federal Contributed 
See Annual and Funds Funds 
Project Report for Authority Expended Expended 
Ala Wai Harbor, Oahu, Hawaii 1976 November 1986 $ 40,117 
PL 99-662 
Hana Small Boat Harbor, 1967 November 1977 
Maui, Hawaii HD #94-413 
Hanalei Small Boat Harbor, 1967 November 1981 
Kauai, Hawaii HD #97-59 
Hanapepe Bay, Kauai, Hawaii 1965 November 1986 
PL 99-662 
Kaimu Black Sand Beach, 1975 July 1981 86,235 
Hawaii, Hawaii Director of 
Civil Works 
Kapaakea Homestead Flood Control 1979 July 1981 221,500 
Molokai, Hawaii Director of 
Civil Works 
Kewalo Harbor, Oahu, Hawaii 1976 September 1975 98,800 
Director of 
Civil Works 
Talofofo Bay Shore Protection, Guam --- August 1981 80,764 
Director of 
Civil Works 
Waimea Beach, Kauai, Hawaii --- November 1986 --- 
PL 99-662 
Wake Island Harbor, Wake Island 1950 November 1986 14,493 
PL 99-662 
36-12

PORTLAND, OR, DISTRICT * 
The territorial limits of the Portland District include 
the Pacific coastal drainage area of the State of 
Oregon, the portions of the States of Oregon and 
Washington which lie within the Columbia River 
watershed downstream of the Umatilla Bridge below 
McNary Dam, and south central Oregon west of the 
Malheur River and the Steens Mountains, but not 
including that part which drains into the Klamath 
Lake and River. 
IMPROVEMENTS 
Navigation Page 
1. Bonneville Navigation Lock, 
Bonneville Dam, OR and WA ............ 37-2 
2. Chetco River, OR ........................ 37-2 
3. Columbia and Lower Willamette Rivers 
below Vancouver, WA, and 
Portland, OR ............................. 37-2 
4. Columbia River at Baker Bay, WA ........ 37-4 
5. Columbia River between Chinook, WA, 
and Head of Sand Island ............... 37-4 
6. Columbia River at the Mouth, OR. 
and WA ............................... 37-4 
7. Columbia River between Vancouver, WA 
and The Dalles, OR ..................... 37-4 
8. Coos Bay, OR .......................... 37-5 
9. Coos and Millicoma Rivers, OR ........... 37-6 
10. Coquille River, OR .................... 37-6 
11. Depoe Bay, OR .......................... 37-6 
12. Navigation Work Under Special 
Authorization ......................... 37-7 
13. Nehalem Bay, OR ....................... 37-7 
14. Port Orford, OR ......................... 37-7 
15. Project Condition Surveys ............... 37-7 
16. Rogue River Harbor at Gold Beach, OR .... 37-7 
17. Siuslaw River, OR ..................... 37-8 
18. Skipanon Channel, OR ................... 37-8 
19. Tillamook Bay and Bar, OR .............. 37-8 
20. Umpqua River, OR .................... 37-9 
21. Willamette River at Willamette 
Falls, OR...................................... 37-9 
22. Yaquina Bay and Harbor, OR ........... 37-10 
Flood Control 
23.-Applegate Lake, Rogue River 
Basin,OR .............................. 
24. Blue River Lake, OR .................... 
25. Cottage Grove Lake, OR ................. 
26. Deschutes River, Bend, OR .............. 
27. Dorena Lake, OR .................... 
28. Elk Creek Lake, Rogue River Basin, OR .. 
29. Fall Creek Lake, OR .................. 
30. Fern Ridge Lake, OR .................... 
37-10 
37-11 
37-11 
37-11. 
37-11 
37-12 
37-12 
37-13 
31. Flood Control Work Under 
Special Authorization ................. 
32. Inspection of Completed Flood Control 
Projects .............................. 
33. Inspection of Completed PL-99 Works .... 
34. Lower Columbia River Basin, 
OR and WA ......................... 
35. Lower Columbia River Basin Bank Protection, 
OR and WA ....... .......... 
36. Mt. St. Helens & Vicinity, WA ........... 
37. Mt. St. Helens Sediment Control, Castle 
Rock, WA ............................. 
38. Scheduling Flood Control Reservoir 
Operations ........................... 
39. Willamette River Basin, OR ............. 
40. Willamette River Basin Bank Protection, 
OR .................................... 
41. Willow Creek Lake, Heppner, OR ........ 
Multiple-Purpose Projects, 
Including Power 
42. Bonneville Lock and Dam - Lake 
Bonneville, OR and WA ................. 
43. Cougar Lake, OR ....................... 
44. Detroit Lake, OR ........................ 
45. Green Peter-Foster Lakes, OR ............ 
46. Hills Creek Lake, OR .................... 
47. John Day Lock and Dam - Lake 
Umatilla, OR and WA ................. 
48. Lookout Point Lake, OR ................. 
49. Lost Creek Lake, Rogue River 
Basin, OR ........ .,................. 
50. The Dalles Lock and Dam - Lake Celilo, 
WA and OR ............................ 
General Investigations 
51. Surveys ................. ............ 
52. Collection and Study of Basic Data ...... 
37-1 
Page 
37-13 
37-13 
37-14 
37-14 
37-14 
37-15 
37-15 
37-15 
37-15 
37-16 
37-16 
37-16 
37-17 
37-18 
37-18 
37-19 
37-19 
37-20 
37-20 
37-21 
37-21 
37-22 
__ __ __ __ _

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Tables 
Table 37-A Cost & Financial Statement .... 37-23 
Table 37-B Authorizing Legislation ........ 37-30 
Table 37-C Other Authorized Navigation 
Projects .................... 37-38 
Table 37-D Not Applicable 
Table 37-E Other Authorized Flood Control 
Projects ........................ 37-39 
Table 37-F Other Authorized Multiple Purpose 
Projects, Including Power .. 37-43 
Table 37-G Deauthorized Projects .......... 37-43 
Table 37-H Columbia and Lower Willamette 
River Below Vancouver, WA and 
Portland, OR ................. 37-44 
Table 37-I Navigation Activities Pursuant 
to Section 107, Public Law 
86-645 ...................... 37-44 
Navigation 
1. BONNEVILLE NAVIGATION LOCK, BONNEVILLE 
DAM, OR and WA 
Location. On Columbia River 40 miles east of Portland, 
OR about 146 miles above mouth of river. 
Existing project. The existing lock chamber is 76 
feet wide and 500 feet long with 24.2 feet depth of water 
over the sill. Construction of a new navigation lock just 
south of the existing lock was authorized in the FY 1985 
Supplemental Appropriations Act, Public Law 99-88 
August 15, 1985. Inland Waterways Trust Fund will 
fund 50 percent of project cost in accordance with the 
Water Resources Development Act of 1986, Public Law 
99-662, November 17, 1986. The new lock chamber will be 
86 feet wide and 675 feet long with 19 feet depth of water 
over the sill. Estimated cost for construction of the new 
navigation lock is $212,000,000 
Local cooperation. None required. 
Operations during fiscal year. New Work: 
Construction of relocation portion of the new navigation 
lock was initiated in May 1986 with award of a horizontal 
drain contract for stabilization of a potential slide 
area. Relocation of a section of the main line of the 
Union Pacific Railroad and modification of the I-84 off 
ramp was completed in August 1987. A contract for 
excavation of lock chamber was awarded in July 1987. 
2. CHETCO RIVER, OR 
Location. Rises in Siskiyou Mountains of Coast 
Range at an elevation of 4,000 feet, flows for about 51 
miles in a circuitous route, and empties into Pacific 
Ocean at Brookings, OR, 300 miles south of entrance to 
Columbia River and 345 miles north of San Francisco 
Bay. (See National Oceanic and Atmospheric Administration 
Charts 18600 and 18203.) 
Existing projects. Provides for two jetties at the 
mouth of the river. Modification in 1965 authorized an 
entrance channel 120 feet wide by 14 feet deep; a barge 
Table 37-J Project Condition Surveys ...... 37-44 
Table 37-K Willamette River at Willamette 
Falls, OR, Principal Features of 
Existing Canal and Locks ...... 37-44 
Table 37-L Flood Control Activities Pursuant 
to Section 205, Public Law 
80-858 ...................... 37-45 
Table 37-M Flood Control Reservoir 
Operations .................... 37-45 
Table 37-N Lower Columbia River Basin, 
OR and WA, Levees and Improvements 
to Existing Works .. 37-46 
Table 37-0 Willamette River Basin Comprehensive 
Plan ............... 37-47 
Table 37-P Principal Data Concerning 
Navigation Lock, Spillway Dam 
and Powerplant ............. 37-48 
turning basin about 250 feet wide, 650 feet long, and 14 
feet deep; and a small boat access channel 100 feet wide 
by 12 feet deep. Also authorized was a 450-foot extension 
of north jetty with an increase in elevation of existing 
portion and a protective dike about 1,800 feet long with a 
top elevation of 18 feet. Mean lower low water is plane of 
reference. Tidal range between mean lower low water 
and mean higher high water is 6.9 feet and extreme is 
about 12 feet. Construction of jetties was completed 
December 1957. Removal of rock pinnacles and an 
abandoned bridge structure was accomplished in June 
1959. Under authorized modification of October 1965, 
two contracts were completed. Construction of entrance 
channel and extension of north jetty was completed in 
July 1969. Construction of a protective dike, turning 
basin and small boat access channel was completed in 
March 1970. 
Local cooperation. Fully complied with. 
Terminal facilities. The Port of Brookings has developed 
two large boat basins, one for commercial fishing 
boats and the other for sport boats, and a public boat 
launching ramp. There are four fish receiving docks and 
a sea-going barge dock for lumber loading and storage. 
There is also a privately owned marina and a Coast 
Guard Station. 
Operations during fiscal year. Maintenance: A 
total of 15,164 cubic yards of material was removed by 
the U.S. hopper dredge Yaquina. 
3. COLUMBIA AND LOWER WILLAMETTE 
RIVERS BELOW VANCOUVER, WA, AND 
PORTLAND, OR 
Location. The Columbia River rises in British 
Columbia, through which it flows for 425 miles. It enters 
the United States in northeastern Washington, and 
empties into the Pacific Ocean 645 miles north of San 
Francisco Bay and 160 miles south of Strait of Juan 
DeFuca. Total length of river is 1,210 miles. (See NOAA 
Charts 18520,18521,18522,18523,18524,18526, & 18531; 
37-2

PORTLAND, OREGON DISTRICT 
also Geological Survey Map of Washington). Willamette 
River rises in Cascade Range in western Oregon, flows 
northerly, and empties into Columbia River about 100 
miles from the sea. Its length from source of Middle Fork 
is about 294 miles. Project embraces 103.5 miles of 
Columbia River below Vancouver, WA, and 14.6 miles of 
Willamette River below Portland, OR. (See NOAA Chart 
18526 and Geological Survey Map, State of Oregon.) 
Existing project. Provides for a channel 35 feet deep 
and 500 feet wide from River Mile 106.5 to 105.5, the 
distance between existing highway and railroad 
bridges; a channel 40 feet deep and 600 feet wide from 
Vancouver, WA, River Mile 105.5 to mouth of Columbia 
River, River Mile 3; a turning basin at Vancouver, WA, 
40 feet deep, 800 feet wide, and about 5,000 feet long; a 
turning basin at Longview, WA, 40 feet deep, average 
width of 1,200 feet, and about 6,000 feet long; and a 
channel 40 feet deep in the Willamette River with varying 
widths of 600 to 1,900 feet from mouth (River Mile 0) 
to Broadway Bridge (River Mile 11.6) which encompasses 
Portland Harbor area, subject to provisions that 
channel from mouth of Willamette Iiver to turning 
basin at Vancouver, WA, be limited to 500 feet in width 
until need for additional width is demonstrated by developed 
traffic. Existing project also provides for auxiliary 
channels 10 feet deep and 300 feet wide near Cathlamet, 
WA; 30 feet deep and 300 feet wide in St. Helens 
(Oregon); and 30 feet deep and 500 feet wide connecting 
upper end of St. Helens Channel with main ship channel 
of Columbia; 24 feet deep and 200 feet wide along frontage 
of town of Rainier, OR, extended at its upper and 
lower ends to deep water in Columbia River, 8 feet deep 
and 150 feet wide from this depth in Columbia River 
through old mouth of Cowlitz River to a point about 
3,000 feet upstream from present terminus of harbor line; 
a channel from Longview Port dock downstream along 
pierhead line and past Weyerhaeuser Timber Co. plant 
at Longview to a connection with main ship channel 
below Mount Coffin, the downstream 2,400 feet of this 
channel to be 30 feet deep and 300 feet wide and 
remainder to be 28 feet deep and 250 feet wide; construction 
of a small boat mooring basin at Astoria, OR, to 
include a sheet pile, sand-filled breakwater about 2,400 
feet long with a 30 foot roadway along its full length, and 
steel pile shore wings totaling about 1,460 feet long and 
for stone-and-pile dikes and revetments. Plane of reference 
in estuary from mouth to Harrington Point is mean 
lower low water; thence to Portland and Vancouver, 
adopted low water. Tidal range between mean lower low 
water and mean higher high water at mouth of Columbia 
is about 8 feet, and at Portland and Vancouver about 
3 feet at low stages of rivers. Extreme tidal ranges are 
about 13 and 3 feet, respectively. Annual freshets have 
little effect on stage of tide at mouth of Columbia; at 
Portland and Vancouver they average about 12 feet, 
while highest known reached a stage of 33 feet above low 
water at Portland. 
Work on the 40-foot channel in Columbia River from 
Portland, OR, and Vancouver, WA, to the sea was completed 
in 1976 except for observation of channel to 
determine if additional control structures or dredging 
will be required. Auxiliary channel in vicinity of Longview 
was completed in 1949, and improvement of mouth 
of Cowlitz River and small boat mooring basin at Astoria 
were completed in 1950. Project depths are maintained 
all year except for the period immediately following 
the annual freshet in May-June when shoaling 
occurs at several locations. Timing of vessel movement 
with tidal fluctuations permit maximum draft conditions. 
In Columbia and Willamette Rivers between 
mouth and Broadway Bridge at Portland a depth of 40 
feet at low tide and 42 feet at high tide is practicable all 
year. In Columbia River between mouth of Willamette 
River and Vancouver, WA, depths of 40 and 42 feet at low 
and high tide, respectively, are practicable all year. (For 
details relating to previous project, see pages 1995 and 
1998 of Annual Report for 1915 and page 1746 of Annual 
Report for 1938.) 
Local cooperation. Fully complied with. Requirements 
are described in full on page 37-3 of FY 1981 
Annual Report. 
Terminal facilities. At Portland, OR, there are six 
Port of Portland terminals consisting of 43 berths 
equipped to handle general cargo, bulk cargo, lumber, 
automobiles, lift-on-lift-off and roll-on-roll-off containers, 
and breakbulk vessels. The Port of Portland owns 
and operates a major ship repair yard, which includes 
the West Coast's largest, and the world's third largest, 
floating dry dock. Also available in the harbor area are 
privately operated facilities for receiving, storing and 
outloading petroleum, wood chips, grain, logs, sand and 
gravel, cement and steel products. 
At Astoria, OR, there is a terminal with facilities for 
receiving and handling all types of general cargo. 
At Vancouver, WA, there are municipal facilities capable 
of berthing five ships simultaneously. Each berth is 
completely outfitted with mechanical and lift facilities 
for receiving and handling all types of cargo. The port 
has a low dock to handle roll-on-roll-off and side-port 
discharging vessels. The grain terminal has a storage 
capacity of 4,500,000 bushels. 
Port of Longview has a public terminal on Columbia 
River and a privately owned grain elevator with a capacity 
of 6,900,000 bushels. This port also has a heavy lift 
facility, with a capacity of 600 tons. 
Port of Kalama has two berthing areas, one port 
owned and one private. 
At other locations on Columbia River between Portland 
and Columbia River entrance there are sufficient 
private facilities to accommodate river vessels and fishing 
craft. These facilities, with planned extensions, are 
considered adequate for existing commerce. (For details, 
see Port Series Nos. 33 and 34, Corps of Engineers, published 
in 1974 and 1975 respectively.) 
Operations during fiscal year. Maintenance: 
Regular maintenance continued through the year. A 
total of 5,610,628 cubic yards of material 
was removed. The U.S. hopper dredge Essayons 
removed 2,433,550 cubic yards, and U.S. hopper 
dredge Yaquina removed 52,637 cubic yards. In 
addition, the pipeline dredge Oregon removed 
3,124,441 cubic yards. 
37-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
4. COLUMBIA RIVER AT BAKER BAY, WA 
Location. Baker Bay is a shallow body of water about 
15 square miles in extent on the north side of Columbia 
River near its mouth. The bay is separated from the river 
by Sand Island, a low-lying sand bar only a few feet 
above high tide level. (See NOAA Chart 18521.) 
Existing project. A mooring basin 10 and 12 feet 
deep, about 20 acres in extent with protecting breakwaters; 
and a west channel 16 feet deep and 200 feet wide for 
the first 2000 feet, then 16 feet deep and 150 feet wide to 
the boat basin; a channel east of Sand Island to Port of 
Ilwaco, a distance of about 4 miles. Mean lower low 
water is plane of reference. Tidal range between mean 
lower low water and mean higher high water is about 8 
feet, and extreme about 13 feet. 
Channel extending through easterly passage of Sand 
Island was completed in 1934. This portion of authorized 
project is not passable and is not maintained at the 
present time. Dredging west channel to 8 feet was 
accomplished September 1948. Deepening west channel 
to 10 feet, and boat basin and breakwater construction at 
Ilwaco, WA, was finished December 1957, and again, 
deepening of the west channel to 16 feet completed in 
August 1985 under Section 107, finished the project. 
Local cooperation. Fully complied with. 
Terminal facilities. Wharves, floats, ramps, and 
berths, for fishing craft, barges and tow-boats. Smallboat 
basin and protecting breakwater provides moorings 
for numerous fishing and recreational craft all 
year. Facilities are considered adequate for existing 
commerce. 
Operations during fiscal year. Maintenance: U.S. 
hopper dredge Yaquina removed 40,226 cubic yards of 
material. 
5. COLUMBIA RIVER BETWEEN CHINOOK, 
WA, AND HEAD OF SAND ISLAND 
Location. At easterly end of Baker Bay, lying on 
north side of Columbia River near mouth. (See Coast 
and Geodetic Survey Chart 6151.) 
Existing project. Channel 10 feet deep and 150 feet 
wide, extending from head of Sand Island to Chinook; a 
turning and mooring basin at upper end of channel, 10 
feet deep, 660 feet long, and ranging from 275 to 500 feet 
wide; reconstruction of easterly 393 feet of existing 
breakwater; and extension of existing breakwater easterly 
and thence northerly to connect with shore in vicinity 
ofPortland Street, Chinook, WA.Tidal range between 
mean lower low water and mean higher high water is 
about 8 feet and extreme about 13 feet. 
Project as originally authorized was completed in 
1940. The 10-foot channel depth modification was 
accomplished September 1958. Rehabilitation of existing 
breakwater was completed September 1962. 
Local cooperation. Fully complied with. 
Terminal facilities. Chinook Packing Company 
owns a wharf for receiving fresh fish, and one additional 
fish buying company is located at Chinook. A portion of 
wharf is also used as a public landing. At upper end of 
channel there is a turning and mooring basin with facilities 
for mooring 350 fishing and recreational craft. Adequate 
terminal and mooring facilities include a public 
launching ramp, hoist with 10-ton capacity and suitable 
supply facilities. 
Operations during fiscal year. Maintenance: Contract 
Clamshell dredge D. B. Beaver removed 177,059 
cubic yards of material. 
6. COLUMBIA RIVER AT THE MOUTH, OR 
AND WA 
Location. The Columbia River entrance is 645 miles 
north of San Francisco Bay. Project is about 120 miles 
downstream of Portland, OR, and Vancouver, WA. For 
description of Columbia River see Section 4. 
Existing project. Provides for a one-half-mile-wide 
channel across a bar 55 feet deep (mean lower low water) 
for the northernmost 2,000 feet, and 48 feet deep (mean 
lower low water) along the southern 640 feet, to be 
secured by two rubblemound jetties, spur jetty "A" on 
the north shore and by dredging. The north jetty is about 
2.5 miles long and the south jetty about 6.6 miles long, 
spur jetty "A" is about 0.3 miles long. Tidal range on bar 
between mean lower low water and mean higher high 
water is about 8 feet, and extreme about 13 feet. 
The originally authorized project depth of 40 feet was 
completed in 1918; south jetty completed in 1914 and 
north jetty in 1917. A spur jetty (jetty "A") was completed 
in 1939 (repaired in 1961) for the purpose of channel 
stabilization. Spur jetty "B" currently is classified 
"inactive." Dredging of the 48-foot bar channel started 
April 1956 was completed in September 1957. South jetty 
rehabilitation started June 1962 was completed September 
1964. North jetty rehabilitation started January 
1965 was completed April 1965. Additional rehabilitation 
of the south jetty was initiated in May 1982 and 
completed in September 1982. Deepening bar channel to 
55 feet completed September 1984. Project dimensions 
were available at end of fiscal year. (For details relating 
to previous projects, see page 1999, Annual Report for 
1915 and page 1740 of Annual Report for 1938.) 
Local cooperation. Fully complied with. Local 
interests contributed $500,000 toward construction of 
the north jetty which was completed in 1917. 
Operations during fiscal year. Maintenance: The 
U.S. hopper dredge Essayons removed 3,973,758 cubic 
yards of material. 
7. COLUMBIA RIVER BETWEEN VANCOUVER, 
WA, AND THE DALLES, OR 
Location. On Columbia River, between Interstate 
Bridge at Vancouver, WA, 106.5 miles above mouth and 
The Dalles, OR, mile 191, a distance of 84.5 miles. For 
description of Columbia River, see Section 4, "Columbia 
and Lower Willamette Rivers Below Vancouver, WA, 
and Portland, OR." 
Existing project. Channel 27 feet deep at low water 
and 300 feet wide between Vancouver, WA, and The 
Dalles, OR, 84.5 miles; a channel 10 feet deep at low 
water and 200 feet wide at upstream entrance to Oregon 
Slough, OR; a suitable turning basin adjacent to site of 
port development in vicinity of Camas and Washougal, 
37-4

PORTLAND, OREGON DISTRICT 
WA; a boat basin at Hood River, OR, 500 by 1,300 feet 
and 10 feet deep at normal Bonneville pool level, with a 
connecting channel of same depth to deepwater, and a 
protecting breakwater on easterly side; a barge channel 
to waterfront at Bingen, WA, 10 feet deep at normal 
Bonneville pool level, 200 feet wide and about 1 mile 
long, and an access channel 7 feet deep at normal Bonneville 
pool level, 100 feet wide and about 1,000 feet long, 
to a natural mooring basin for small boats near east end 
of channel; and construction of The Dalles small boat 
basin, to provide a breakwater and shear boom protected 
basin about 400 by 800 feet in size with depth of 8 feet 
below a pool elevation of 72.5 feet at mean sea level. 
Tidal range between mean lower low water and mean 
higher high water at Vancouver is about 3 feet and at 
Bonneville about 0.2 foot at low stages of the river. 
Extreme tidal ranges are about 4 feet and 0.4 foot, 
respectively. 
Existing project is complete. Construction of The 
Dalles small boat basin, was completed in 1949. Channel 
dredging at upper end of Oregon Slough was 
accomplished in 1957. Project depth of 27 feet between 
Bonneville and The Dalles, OR, was achieved April 
1959. The 27-foot channel depth between Vancouver, 
WA, and Bonneville, OR, was completed May 1938. 
Improvement of lower entrance of Bonneville Dam lock 
was completed in May 1961. At the present time, the 
channel is maintained to a depth of 16 feet, which is 
adequate for using traffic. Construction of a boat basin 
at Hood River, OR, and of Camas-Washougal, WA, turning 
basin was accomplished February 1962. Construction 
of a barge channel in Columbia River near Bingen, 
WA, was completed September 1963. Small boat recreation 
channel 100 feet wide 6 feet deep at South Channel 
Government Island completed 1985 under section 107. 
Local cooperation. Fully complied with. 
Terminal facilities. At Vancouver, WA, upstream of 
Interstate Highway bridge at River Mile 108.1 on site of 
former shipyard are numerous ship-building facilities 
equipped with railway and river moorage facilities. Also 
in this area are a paper-storage warehouse with barge 
slip, two boat building businesses, and a storage dock 
with gantry crane. Sites are available for development to 
suit lessee. 
At Camas, WA, about 13.5 miles upstream from Vancouver, 
there is a private wharf used for transfer of 
paper-mill supplies and paper to and from barges, and 
facilities for discharging bulk oils from barges. 
At Port of The Dalles (mile 44 above Bonneville) there 
is amunicipal wharf 125 by 1,100 feet for use by tugs and 
barges. There is one one-story timber and corrugated 
iron warehouse, 94 by 461 feet, on this wharf. A private 
elevator with a capacity of 40,000 bushels and a public 
elevator of 1,113,800-bushel capacity for handling bulk 
grain to barges are also at The Dalles. Public elevator 
has rail, truck, and water connections. There is a port 
owned rail connection about three-fourths mile below 
municipal wharf where certain types of cargo may be 
handled between railroad cars and barges. 
At numerous locations along the entire waterway 
there are facilities for transfer of logs to water from 
trucks and public and private boat basins. Facilities are 
considered adequate for present commerce. 
Operations during fiscal year. Maintenance: The 
U.S. hopper dredge Yaquina removed 100,186 cubic 
yards of material and contract clamshell dredge D. B. 
Rainier removed 32,112 cubic yards of material. 
8. COOS BAY, OR 
Location. On Oregon coast 200 miles south of mouth 
of Columbia River and 445 miles north of San Francisco 
Bay. It is about 13 miles long and 1 mile wide, with an 
area at high tide of about 15 square miles. (See NOAA 
Charts 18580 and 18587.) 
Existing project. Two rubblemound, high-tide jetties 
at entrance; a channel across the outer bar 45 feet 
deep and700 feet wide, reducing gradually to 35 feet deep 
and 300 feet wide near River Mile 1 and continuing to 
about mile 9; thence a channel 35 feet deep and generally 
400 feet wide to mile 15; an anchorage area 35 feet deep, 
800 feet wide, and 1,000 feet long at Empire (River Mile 
5.5); turning basins at North Bend (River Mile 12.5) and 
Coalbank (River Mile 14.7) 35 feet deep, 650 feet wide and 
1,000 feet long; a channel 22 feet deep and 150 feet wide 
from Smith's Mill (River Mile 15) to Millington (River 
Mile 17); a small boat basin, about 500 by 900 feet at 
Charleston, with a connecting channel, 16 feet deep, 150 
feet wide and 6,200 feet long, to deep water in Coos Bay, 
and construction of a protecting breakwater and bulkhead. 
Plane of reference is mean lower low water. Tidal 
range between mean lower low water and mean higher 
high water is 7 feet and extreme is about 11 feet at both 
the entrance and at Coos Bay. 
South jetty was completed in 1928, north jetty in 1929, 
and 24-foot channel in 1937. The south jetty was restored 
in 1941 and 1942 by construction of a concrete cap for full 
length of the jetty. Excavation of channel to 30 feet deep 
and generally 300 feet wide from entrance to Isthmus 
Slough was completed in 1951. Dredging outer bar 
channel to a depth of 40 feet, decreasing to 30 feet at 
Guano Rock was completed in 1952. Construction of the 
Charleston Channel and small-boat basin was completed 
in September 1956. Rehabilitation of south jetty 
was started in June 1962 and completed December 1963. 
Repair of north jetty was completed in August 1970. 
Construction of the deeper and wider channel to mile 15 
was completed in 1979. Deepening of Charleston channel 
and turning basin completed in 1985 under Section 
107. (For details relating to previous projects, see page 
1987 of Annual Reportfor 1915 and page 1728 of Annual 
Report for 1938.) 
Local cooperation. Fully complied with. Requirements 
are described in full on page 37-5 of FY 1981 
Annual Report. 
Terminal facilities. At North Bend there is a municipal 
dock 649 feet long fronting on channel, about 2,380 
feet of privately owned mill docks, and three oilreceiving 
terminals in vicinity. 
At Coos Bay there is a privately owned dock with a 
frontage of 1,345 feet, open to the public on equal terms; 
37-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
several small landings for fishing and harbor craft; and 
three lumber docks with 1,300, 576, and 500-foot frontages, 
respectively. 
At Eastside, on Isthmus Slough, there is a 200-foot 
dock. 
At Empire there is a privately owned lumber dock with 
frontage of 510 feet, and an oil terminal, owned by Port of 
Coos Bay, for receipt of petroleum products by barge. A 
barge slip also owned by the Port was completed in 1986. 
At Charleston there are wharves, for receipt of fresh 
fish and shellfish and a large seafood receiving and 
processing plant. There are also two municipally owned 
small-boat basins, open to all on equal terms, capable of 
mooring 250 fishing and recreation craft. Servicing 
facilities for small craft are available at all facilities, and 
public launching ramps have been constructed in 
Charleston area by private interests. A privately owned 
floating moorage on Joe Ney Slough has facilities for 
mooring about 50 fishing vessels. 
At Jordan Cove area there is a dock, 248 feet long, for 
wood chip ships. 
These facilities are considered adequate for existing 
commerce. (For details see Port Series No. 33, Corps of 
Engineers, published in 1975.) 
Operations during fiscal year. Maintenance: Total 
of 1,353,773 cubic yards removed. U.S. hopper dredge 
Yaquina removed 280,192 cubic yards; Essayons 
removed 297,800 cubic yards and the contract hopper 
dredge Padre Island removed 775,781 cubic yards of 
material. The sand-bypasser Sandwick displaced sand 
from shoal areas. 
9. COOS AND MILLICOMA RIVERS, OR 
Location. South Fork and Millicoma Rivers rise in 
Coast Range in southern Oregon, flow generally westerly 
and join to make Coos River, 5.3 miles above mouth 
of Coos River in Coos Bay. (See NOAA Chart 18587, 
Allegany and Daniels Creek Quadrangle.) 
Existing project. Originally authorized project: a 
channel depth of 3 feet, generally, from mouth of Coos 
River and 1 foot near head of navigation. Project as 
modified: two channels 5 feet deep and 50 feet wide from 
mouth of Coos River to Allegany on Millicoma River, 
mile 13.8 and to Dellwood on South Fork, mile 14, and 
thence a channel 3 feet deep and 50 feet wide to mile 14.7 
on South Fork, including stabilization works on Coos 
River. Mean lower low water is plane of reference. Tidal 
range between mean lower low water and mean higher 
high water at the mouth of Coos River is 7 feet and 
extreme about 11 feet. Tidal range at head of navigation 
in both forks is about 1 foot. Freshetstages usually reach 
a height of from 10 to 15feet at Allegany, head of navigation 
on Millicoma River. 
Originally authorized project providing for a channel 
from mouth ofCoos River to head of navigation in both 
forks, to provide a depth of 3 feet generally and 1 foot 
near head of navigation, was completed in 1899. In 
March 1966 construction of project as modified by 1948 
River and Harbor Act was completed. 
Local cooperation. Fully complied with. 
Terminal facilities. Several small privately owned 
docks and landing places on the river are used by towboats 
and pleasure craft. There are no publicly owned 
docks. Present facilities are considered adequate for 
existing commerce. Major log processing yards are 
located at the head of navigation on both rivers. 
Operations during fiscal year. Plans and specifications 
prepared in anticipation of dredging need. 
10. COQUILLE RIVER, OR 
Location. Rises in Coast Range, flows generally westerly 
for about 100 miles, and empties into Pacific Ocean 
at Bandon, OR, 225 miles south of mouth of Columbia 
River and 420 miles north of San Francisco Bay. (See 
NOAA Charts 18580 and 18186.) 
Existing project. Two rubblemound high-tide jetties 
at river mouth, south jetty 2,700 feet long and the north, 
3,450 feet long; and a channel 13 feet deep at mean lower 
low water and of suitable width from the sea to a point 1 
mile above old Coquille River Lighthouse, and snagging 
to State highway bridge at city of Coquille. Mean lower 
low water is plane of reference. Tidal range between 
mean lower low water and mean higher high water at 
mouth is 7 feet and extreme about 10 feet. 
Jetties were completed in 1908 and entrance channel 
in 1933. North jetty was reconstructed in 1942 and a 
750-foot extension to easterly end was constructed in 
1951. South jetty was repaired in 1954 and north jetty in 
1956. Coquille Lighthouse rehabilitation was completed 
June 21, 1976. Port of Bandon constructed boat basin 
facility in conjunction with protective breakwater and 
entrance channel construction in 1985, under Section 
107. (For details relating to previous projects, see page 
1986 of Annual Report for 1915 and page 1727 of Annual 
Report for 1938.) 
Local cooperation. None required. However, restoration 
of lighthouse using Code 710, Recreation Facilities 
at Completed Projects, funding required 50 percent 
cost sharing with non-Federal sponsor (Oregon State 
Parks). 
Terminal facilities. At Bandon: A privately owned 
mill dock used exclusively for shipping lumber on 
coastwise vessels, a publicly owned wharf, and a smallboat 
basin open to all on equal terms. 
Operations during fiscal year. Maintenance: U.S. 
hopper dredge Yaquina removed 37,999 cubic yards of 
material from entrance channel. An analysis was performed 
to determine the economic benefits generated by 
maintaining this project. 
11. DEPOE BAY, OR 
Location. Harbor on Oregon coast 100 miles south of 
mouth of Columbia River. (See Coast and Geodetic Survey 
Chart 5902.) 
Existing project. Two breakwaters north of 
entrance; an entrance channel 8 feet deep and 50 feet 
wide; and inner basin 750 feet long, 390 feet wide and 8 
feet deep with retaining wall along easterly side; and a 
stone spending beach. Mean lower low water is plane of 
37-6

PORTLAND, OREGON DISTRICT 
reference. Tidal range between mean lower low water 
and mean higher high water is 8 feet and extreme is 
about 12 feet. Project as originally authorized was completed 
in 1939 and project modification, enlarging the 
basin and deepening to 8 feet, was accomplished in June 
1952 and August 1966. 
Local cooperation. Fully complied with. 
Terminal facilities. Facilities, in inner basin, consist 
of landings and floats to accommodate operators of 
excursion and commercial fishing boats. Facilities considered 
adequate for existing commerce. 
Operations during fiscal year. Maintenance: Contract 
pipeline dredge Karen removed 1,456 cubic yards of 
materials at North East corner of boat basin. An analysis 
was performed to determine the economic benefits 
generated by maintaining this project. 
12. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION 
Navigation activities pursuant to Section 107, 
Public Law 86-645 (preauthorization). 
See Table 37-I. 
Aquatic plant control (Section 302, Public Law 
89-298): 
Sampling and identification of aquatic plant infestation 
in Columbia River and Willamette River Basins 
were accomplished. Total costs for fiscal year were 
$51,163. 
13. NEHALEM BAY, OR 
Location. On Oregon coast, 40 miles from Columbia 
River mouth and 10 miles north of the entrance to Tillamook 
Bay. 
Existing project. Provides for a jetty about 3,850 feet 
long on the north side of entrance and a jetty 4,950 feet 
long on the south side. Mean lower low water is plane of 
reference. Tidal range between mean lower low water 
and mean higher high water is 8 feet, extreme is about 15 
feet. Project as originally authorized was completed in 
1918. Rehabilitation work was initiated in May 1981 and 
completed November 1982. 
Local cooperation. None required. 
Terminal facilities. Facilities for pleasure craft only: 
Dart's Marina, Brighton Moorage, Jetty Fishery, Port of 
Nehalem and city of Nehalem Dock. All areas have 
approximately 50-60 slips. 
Operations during fiscal year. Maintenance: 
Inspection performed. 
14. PORT ORFORD, OR 
Location. On Oregon coast 250 miles south of 
Columbia River entrance and 390 miles north of San 
Francisco Bay. (NOAA Chart 18203 and Geological Survey 
Quadrangle, Port Orford, OR.) 
Existing project. Improvement of harbor by 550-foot 
extension of existing locally constructed breakwater 
and dredging of a turning basin, 340 feet long, 100 feet 
wide and 16 feet deep. Breakwater was completed 
October, 1968. Turning basin was completed September 
1971. 
Local cooperation. Fully complied with. 
Terminal facilities. A dock which is a timber piling 
structure about 210 by 70 feet, equipped with hydraulic 
crane for lifting boats from the water to dock for repairs 
and/or storage and removing fish catches from boats. 
Expansion of the dock structure to 210 x 220 feet is 90% 
complete. The installation of the second hydraulic crane 
was completed in FY 1986. About 150 fishing and private 
boats use this dock each year. 
Operations during fiscal year. Maintenance: During 
the summer months, the sand-bypasser Sandwick 
displaced shoal areas to provide longer periods of channel 
depths for navigation traffic within the authorized 
project. A contract submersible pump dredge removed 
3,800 cubic yards of material which would provide users 
with adequate depths to utilize cranes during the winter 
months. An analysis was performed to determine the 
economic benefits generated by maintaining this project. 
15. PROJECT CONDITION SURVEYS 
Surveys were conducted during FY 1987 at a cost of 
$57,816; cumulative costs, $650,816 (See Table 37-J). 
16. ROGUE RIVER HARBOR AT GOLD 
BEACH, OR 
Location. Rises in Cascade Range in southwestern 
Oregon; flows westerly through Coast Range, and empties 
into Pacific Ocean 264 miles south of mouth of 
Columbia River and 381 miles north of San Francisco 
Bay. (See NOAA Chart 18202.) 
Existing project. Two jetties at entrance, and a 
channel 13 feet deep and 300 feet wide from ocean to a 
point immediately below State highway bridge, about 1 
mile, including widening channel at a point about 0.25 
mile below bridge to form a turning basin 13 feet deep, 
500 feet wide, and 650 feet long. At request of local interests, 
turning basin was located in south portion of estuary 
downstream from a point 0.25 mile below bridge. 
This change was effected to permit adequate terminal 
facilities to be constructed adjacent to turning basin. 
Mean lower low water is plane of reference. Range of tide 
between mean lower low water and mean higher high 
water is 7 feet, and extreme about 14 feet. 
Project as authorized has been completed. Construction 
of two jetties at entrance was completed September 
1960. Dredging river channel by contract and entrance 
bar by government plant was completed October 1961. 
North jetty rehabilitation along channel side was completed 
October 1966. Breakwater construction and 
dredging, under contract awarded in September 1964, 
was 17 percent accomplished when flood of December 
1964 destroyed all completed works. Contract was terminated 
as further construction at that location was 
considered unfeasible. Bank protection work at Wedderburn 
location was completed in October 1972. A breakwater, 
constructed by Port of Gold Beach, was completed 
during 1973. In 1984, three pile dikes, south side ofchannel, 
oceanward of the boat basin entrance, were completed. 
Local cooperation. Fully complied with. 
Terminal facilities. There are various landings for 
fishing and recreational craft. At Wedderburn, across 
river from Gold Beach, is a facility to accommodate 
excursion passengers and small freight items destined 
37-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
for various private landings between Wedderburn and 
Agness, OR. Facilities considered adequate for existing 
commerce. 
Operations during fiscal year. Maintenance: A 
total 6f55,661 cubic yards of material was removed. The 
U.S. hopper dredge Yaquina removed 31,531 cubic yards 
at the entrance bar. Contract pipeline dredge Karen 
removed 24,130 cubic yards of material at Gold Beach 
boat basin channel. An analysis was performed to 
determine the economic benefits generated by 
maintaining this project. The sand-bypasser Sandwick 
displaced isolated shoals on the entrance. 
17. SIUSLAW RIVER, OR 
Location. Rises in coast range, flows about 110 miles 
westerly and empties into Pacific Ocean about 160 miles 
south of entrance of Columbia River and 485 miles north 
of San Francisco Bay, CA. (See NOAA Charts 18583 and 
18580.) 
Existing project. Provides for 2 high-tide, rubblemound 
jetties 750 feet apart at the outer end, the north 
jetty 8,390 feet long (600 feet unconstructed) and the 
south jetty 4,200 feet long; an entrance channel 18 feet 
deep and 300 feet wide from deep water in ocean to a 
point 1,500 feet inside the outer end of existing north 
jetty; thence a channel 16 feet deep, 200 feet wide with 
additional widening at bends, and about 5 miles long, to 
a turning basin, 16 feet deep, 400 feet wide, and 600 feet 
long, opposite Siuslaw dock at Florence; a channel 12 
feet deep, 150 feet wide from Florence to mile 16.5; and at 
River Mile 15.5 a turning basin 12 feet deep, 300 feet wide 
and 500 feet long. Mean lower low water is plane of 
reference. Tidal range between mean lower low water 
and mean higher high water at mouth of river is 7 feet 
and extreme about 11 feet. During low stages of river, 
tidal effect extends to Mapleton, 20.5 miles above mouth. 
(For details relating to previous project, see page 1988 of 
Annual Report for 1915.) 
A modification to the existing project was authorized 
by Public Law 96-367, October 1, 1980. North and south 
jetty modifications were completed in FY 85. Modifications 
provide for extending the north and south jetties 
by 1,900 and 2,300 feet respectively. The jetty extensions 
will terminate at approximately the minus 25-foot contour. 
Spur jetties were constructed on each jetty extension 
to reduce longshore currents from transporting 
material around the heads of the jetties. Each spur jetty 
is 400 feet long and originate approximately 900 feet 
shoreward of the jetty head. The north jetty spur is 
oriented 45 degrees to the north of the existing jetty 
alignment and the south jetty spur 45 degrees to the 
south of the jetty alignment. Estimated cost of jetty work 
is $28,295,000; $28,368,000 Corps of Engineers, $183,000 
non-Federal, and $44,000 U.S. Coast Guard. 
Local cooperation. Complied with. 
Terminal facilities. Port dock at Florence, 150 feet 
wide and 350 feet long, is about 5.3 miles above river 
entrance and accommodates a fish-receiving station at 
east end of wharf which maintains a 2-ton capacity 
winch and supplies gasoline, oil and ice to fishermen. 
Other facilities at Florence consist of various floatways 
which provide docking facilities for fishing vessels and 
other small craft and a floating dock with accommodations 
for 75 commercial fishing vessels. Adjacent to 
commercial basin is mooring basin with accommodations 
for 200 sport boats of all sizes. 
Modern docks for loading ocean-going barges with 
packaged lumber is maintained at Mapleton and owned 
by the Davison Lumber Company. 
There are also a number of private landings and log 
booms between Cushman and Mapleton to accommodate 
river traffic. These facilities are considered adequate 
for existing traffic. 
Operations during fiscal year. New work: Contractual 
work on extension of the north and south jetties 
was completed on December 31, 1986. 
Maintenance: U.S. hopper dredge Yaquina removed 
215,778 cubic yards of material. An analysis was 
performed to determine the economic benefit generated 
by maintaining this project. 
18. SKIPANON CHANNEL, OR 
Location. In tidal waterway extending south 2.7 
miles from deep water in Columbia River. Channel 
enters Columbia about 10 miles above mouth and 4 miles 
below Astoria, OR. (See NOAA Chart 18523.) 
Existing project. Channel 30 feet deep and generally 
200 feet wide extending from deep water in Columbia 
River to railroad bridge at Warrenton, OR, distance of 
1.8 miles, turning basin of same depth, mooring basin 12 
feet deep at mean lower low water at Warrenton, OR, and 
channel 6 feet deep, generally 40 feet wide, with 
increased widths at log dumps and terminals, for 4,500 
feet via cutoff channel above railroad bridge. Channel is 
maintained to 16 feet which is adequate for user traffic. 
Mean lower low water is plane of reference. Tidal range 
between mean lower low water and mean higher high 
water is about 8 feet, extreme is about 13 feet. 
Project as authorized is complete. Dredging river 
channel and turning basin was completed in 1939. Construction 
of small-boat mooring basin at Warrenton, OR, 
was completed October 1957, and fill stabilization work 
was accomplished in August 1958. 
Local cooperation. None required. 
Terminal facilities. City of Warrenton owns wharf 
with a 300-foot frontage open to public on equal terms. 
One privately owned cannery wharf with a 300-foot 
frontage is used for unloading fish and handling fish 
nets. One privately owned boatyard has floats and 
moorage facilities for use of a maximum of 80 small 
boats. Small-boat basin has facilities for numerous fishing 
and recreation craft, and a privately owned lumber 
mill has a barge loading facility for chips and lumber. 
Facilities are considered adequate for existing 
commerce. 
Operations during fiscal year. Maintenance: A 
total of 61,364 cubic yards of material was removed. U.S. 
hopper dredge Yaquina removed 11,335 cubic yards of 
material and the contract pipeline dredge Karen 
removed 50;029 cubic yards of material. 
19. TILLAMOOK BAY AND BAR, OR 
Location. Bay is on Oregon coast about 50 miles 
37-8

PORTLAND, OREGON DISTRICT 
south of mouth of Columbia River. (See NOAA Charts 
18520 and 18558.) 
Existing project. Provides for a jetty about 5,700 feet 
long on north side of entrance and a jetty 8,000 feet long 
on south side; a channel through bar 18 feet deep and of 
such width as can be practically and economically 
obtained; for a channel 200 feet wide and 18 feet deep 
from deep water in bay to Miami Cove; and for initial 
dredging to 12 feet deep of a small-boat basin and 
approach thereto at Garibaldi, OR. Project also provides 
for improvement of Bayocean Peninsula, OR, by construction 
of sand and rockfill dike 1.4 miles long, on 
alignment extending between Pitcher Point and town of 
Bayocean. Mean lower low water is plane of reference. 
Tidal range between mean lower low water and mean 
higher high water is 8 feet, extreme is about 14 feet. 
Hobsonville Channel portion of project is inactive. 
Except for construction of Hobsonville Channel portion, 
classified inactive, channels were completed in 
1927, north jetty in 1933, improvement of Bayocean 
Peninsula in 1956, and small-boat basin in 1958. Rehabilitation 
of north jetty was accomplished September 
1965. Construction of south jetty was initiated April 
1969 and was completed in September 1979. 18 foot 
channel to Miami Cove is inactive due to mill closure. 
(For details relating to previous projects, see page 1989 of 
Annual Report for 1915 and page 1474 of Annual Report 
for 1936.) 
Local cooperation. Fully complied with. Requirements 
are described in full on page 37-9 of FY 1981 
Annual Report. 
Terminal facilities. At Garibaldi: A facility owned 
by the Port of Bay City, for shipping lumber and receiving 
logs, a public landing suitable for mooring fishing 
vessels, towboats, and other craft. Small-boat basin has 
adequate facilities for mooring fishing and recreational 
craft. A privately owned boat ramp and moorage is 
available for recreational craft. 
At Bay City: A privately owned wharf used exclusively 
for receipt of fresh fish and shellfish. Facilities 
considered adequate for existing commerce. 
Operations during fiscal year: Maintenance: Condition 
surveys, miscellaneous inspections and reports, 
and an analysis to determine the economic benefits 
generated by maintaining this project was performed. 
20. UMPQUA RIVER, OR 
Location. Rises in Cascade Range, flows westerly 
about 120 miles, and empties into Pacific Ocean 180 
miles south of Columbia River and 465 miles north of 
San Francisco Bay. (See NOAA Charts 18580 and 
18584.) 
Existing project. A jetty on north side of entrance 
about 8,000 feet long, a south jetty 4,200 feet long extending 
to a point 1,800 feet south of outer end of north jetty; 
dredging to provide a usable entrance channel 26 feet 
deep, and a river channel 22 feet deep and 200 feet wide, 
from mouth to Reedsport, a distance of about 12 miles 
with a turning basin at Reedsport 1,000 feet long, 600 
feet wide, and 22 feet deep; deepening of channel at 
Winchester Bay to 16 feet deep by 100 feet wide for 3,100 
feet, then adding 16 feet deep by 100 feet wide for 500 feet, 
and 12 feet deep by 75 feet wide for 950 feet beyond boat 
basin making up the East Boat Channel. A new West 
Boat Channel was added 16 feet deep by 100 feet wide for 
4,300 feet and completed in 1984. Project was modified in 
1951 to provide a channel in Scholfield River, but this 
portion of the project is currently inactive. Mean lower 
low water is plane of reference. Tidal range between 
mean lower low water and mean higher high water at 
river mouth is 7 feet, and extreme range is about 11 feet. 
North jetty was completed in 1930. Extension to original 
south jetty was completed in 1938. Dredging a 22-foot 
channel from mouth of river to Reedsport was completed 
in 1941. Gardiner Channel and turning basin was completed 
in 1949 and Winchester Bay Channel and mooring 
basin in 1956. The 12-foot channel in Scholfield 
River is currently classified inactive. Rehabilitation of 
south jetty was completed August, 1963. Extension of 
training jetty was completed October 9, 1980. Deepening 
Winchester Bay East Channel and new West Channel 
completed 1984 under Section 107. (For details relating 
to previous projects, see page 2967 of Annual Report for 
1898 and page 1732 of Annual Report for 1938.) 
Local cooperation. None required. 
Terminal facilities. At Gardiner there is about 650 
feet of wharf frontage. Also, there is an oil unloading 
facility owned by International Paper Co. for exclusive 
use of tanker barges. Port of Umpqua owns one wharf 
with 456 feet of water frontage, of which 228 feet is 
usable for vessels and another with about 75 feet of 
water frontage which has not been used generally for 
commercial shipping. 
On Bolon Island across the river from Reedsport a 
wharf was constructed which has about 5 acres of open 
storage for lumber and available to all on equal terms. 
At Winchester Bay, 2 miles from river entrance there 
is a major sports and commercial fishing harbor. Facilities 
are considered adequate for existing commerce. 
Operations during fiscal year: New work: Final 
fiscal requirements were completed. 
Maintenance: U.S. hopper dredge Yaquina removed 
407,184 cubic yards of material. An analysis was performed 
to determine the economic benefits generated by 
maintaining this project. 
21. WILLAMETTE RIVER AT WILLAMETTE 
FALLS, OR 
Location. Locks and dam covered by this project are 
at Willamette Falls, a rocky reef in Willamette River at 
Oregon City, OR, about 26 miles above mouth of river. 
Existing project. Provides for construction of a new 
single-lift main lock and a guard lock each with clear 
dimensions of 56 by 400 feet and a minimum depth over 
sills of 9.5 feet, to replace existing facilities which were 
provided for by purchase, rehabilitation, and deepening 
to 6 feet at low water of existing canal and locks and 
separation of canal from waterpower intake by construction 
of a concrete division wall. Construction of a 
new lock has been deauthorized. The existing locks are on 
the National Register for historic sites. Total length of 
existing canals and locks is about 3,500 feet. Principal 
37-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
features of existing canal and locks at Willamette Falls 
are set forth in Table 37-K. Ordinary fluctuation of stage 
of water above locks is 12 feet and extreme, due to flood 
conditions, 20 feet. Below locks, ordinary fluctuation is 
15 feet and extreme 50 feet. 
Canal and locks originally constructed by private 
interests in 1873 were purchased by the United States in 
April 1915 for $375,000. Final report on purchase and 
rehabilitation of canal and locks is in Annual Report for 
1923, when project was reported 98 percent complete. 
Replacement of gates Nos. 6 and 7 was completed 
August 1967 under minor rehabilitation funds. Existing 
locks and grounds are in fair condition and in continuous 
operation except when flooded out by high water or 
undergoing repair. 
Local cooperation. Fully complied with. 
Terminal facilities. James River Paper has a timber 
wharf about 850 feet long, extending to and supported by 
a concrete division wall built in lock canal by the United 
States. This wharf is used for receiving mill supplies and 
shipping paper and paper products. 
Operations during fiscal year. Normal operation 
and maintenance performed. Traffic through lock 
totaled 802,937 tons during calendar year 1985.' 
22. YAQUINA BAY AND HARBOR, OR 
SLocation. Bay is on Oregon coast, 113 miles south of 
mouth of Columbia River. (See NOAA Charts 18580 and 
18581.) 
Existing project. Two high tide rubblemound jetties 
at entrance, north jetty 7,000 feet, and south jetty 8,600 
feet long; a spur jetty on channel side of south jetty 4,700 
feet from its sea end, 800 feet long; five groins channelward 
from south jetty; channel 40 feet deep for a general 
width of 400 feet across bar and at outer end of entrance 
channel; a channel 30 feet deep and 300 feet wide to a 
turning basin of same depth, 900 to 1,200 feet wide and 
1,400 feet long, and a channel 18 feet deep and 200 feet 
wide from 30-foot channel at about mile 2.4, thence 
upstream to abandoned railroad terminus at Yaquina, a 
distance of about 4.5 miles. Project also provides for two 
small boat mooring basins at Newport, OR. Mean lower 
low water is plane of reference. Tidal range between 
mean lower low water and mean higher high water is 8 
feet and extreme is about 12 feet. At mile 1.2 a 1,300 foot 
long breakwater protecting the Port of Newport South 
Beach Marina together with an entrance channel 8 feet 
long by 100 feet wide for a distance of 2,035 feet. 
Project as originally authorized was completed in May 
1952. Restoration of jetties was completed in 1934 and 
extension of north jetty 1,000 feet seaward was completed 
in 1940. Construction of mooring basin at Newport 
and dredging of channel and turning basin to project 
dimensions were completed during fiscal year 1949. 
Restoration of north jetty was again accomplished in 
' 956. Under modification of July 3, 1958, extension of 
th jetty was completed in September 1966, dredging 
40-foot bar channel and 30-foot river channel was 
1pleted in October 1968, and extension of south jetty 
completed in June 1972. (For details relating to 
ous projects see Annual Report for 1893, part 4, 
page 3314, and Annual Report for 1938, page 1736.) 
Local cooperation. None required. 
Terminal facilities. At McLean Point, on north side 
of bay, about 2 miles from entrance, Port of Newport has 
two berths capable of serving ocean-going vessels, one 
435 feet long, the second 520 feet long. At the time the 
second berth was dredged, a retaining wall and fill of 6 
acres were constructed adjacent to deep water. There 
now is 40 acres of filled land adjacent to deep water, and 
of this total, 7 acres were constructed in 1956-57. This 
facility has necessary carriers and lift trucks for handling 
lumber cargoes, warehouse for covered cargo storage, 
and is open to all on equal terms. 
Port of Newport also has a public wharf with 300 feet 
of frontage for servicing fishing boats. In addition, Port 
of Newport maintains 510 berths for mooring commercial 
and sport fishing vessels. There are several seafood 
companies on the bay which have their own facilities for 
handling fresh fish and crab. Supplies and petroleum 
products are readily available for small vessels. On 
south side of bay about 1.2 miles above entrance, Port of 
Newport has constructed South Beach Marina which 
can handle approximately 600 pleasure craft and shallow 
draft fishing boats. Public facilities include public 
automobile and boat trailer parking, boat launching 
ramp, fuel dock, fishing pier, and picnic area. A dry boat 
moorage for 120 boats, is completed. A swing hoist with 
3-ton capacity is currently available and one with 60-ton 
capacity is planned. 
About 1.5 miles above entrance, Oregon Aqua Foods, 
subsidiary of Weyerhaeuser Company, maintains a 
commercial fish farm facility. 
About 2.0 miles above entrance, Oregon State University, 
in conjunction with the Marine Science Center on 
52 acres, maintains a 220-foot pier for docking large and 
small research vessels and a 100-foot float for docking 
small boats. Docking facilities are restricted to research 
vessels and State of Oregon small boats. 
Operations during fiscal year. Maintenance: U.S. 
hopper dredge Yaquina removed 192,362 cubic yards 
and the contract hopper dredge Westport removed 
350,586 cubic yards of material. An analysis was performed 
to determine the economic benefits generated by 
maintaining this project. 
23. APPLEGATE LAKE, ROGUE RIVER 
BASIN; OR 
Location. In Jackson County, OR, on Upper Applegate 
River, a tributary of Rogue River, at River Mile 46, 
about 23 airline miles southwest of Medford, OR. 
.Existing project. A gravel-fill embankiment dam, 
242 feet high from streambed to crest with an overall 
length of 1,300 feet. A gate-controlled concrete chutetype 
spillway on the left abutment, and a regulating 
outlet conduit, and intake tower with multilevel intakes 
on the left side of valley floor. Lake, 5 miles long, provides 
75,000 acre-feet of usable storage for flood control 
and water conservation utilization. Project controls 
runoff from a drainage area of 223 square miles. In 
addition to flood control, reservoir is operated to provide 
irrigation, fish and wildlife enhancement, water quality 
control, and recreation benefits. Recreation facilities 
37-10

PORTLAND, OREGON DISTRICT 
were provided by the Corps of Engineers with operation 
and maintenance by the USFS under a memorandum of 
agreement. Project is complete and operating. 
Local cooperation. Authorizing act requires that 
State of Oregon insure maintenance of stream flow 
released for fishery. In addition, costs allocated to irrigation 
would have to be repaid in a manner and to an 
extent consistent with reclamation laws and policies. 
Oregon Department of Fish and Wildlife made filing 
May 31, 1962 with State Engineer for water rights for use 
of stored water and natural flows for fish habitat 
improvement in amounts and at times specified in project 
authorization. The U.S. Bureau of Reclamation has 
made a feasibility study of Applegate Irrigation Division. 
The results of the study indicate that at present 
there does not appear to be a feasible Federal irrigation 
project for the Applegate River valley. Local interests 
have furnished all local cooperation specified by the 
1970 Flood Control Act. The assurances were approved 
by the Secretary of the Army on May 8, 1975. 
Operations during fiscal year. Maintenance: 
Normal operation and maintenance was performed. 
Freshets regulated by Applegate Lake on Applegate 
River and Rogue River are shown in Table 37-M. 
24. BLUE RIVER LAKE, OR 
Location. On Blue River, a major tributary of 
McKenzie River, 1.8 miles above confluence of the two 
streams at the confluence of Quartz Creek and Blue 
River and about 42 miles easterly of Eugene, OR. 
Existing project. A gravel-fill embankment dam 
1,329 feet long at crest including spillway and 319 feet 
above the lowest point of the general foundation. A concrete 
gravity chute-type spillway with two gates is 
located on left abutment. Outlet works are in left abutment. 
On left shore of reservoir an earth-and-gravel fill 
embankment, about 1,535 feet long and 70 feet high, 
closes a low saddle between Blue River and McKenzie 
River. Project controls runoff from drainage area of 88 
square miles. Reservoir provides 85,000 acre-feet of usable 
flood control storage and is operated as a unit of 
coordinated reservoir system to protect Willamette River 
Valley and increase low waterflows for navigation and 
other purposes. Recreation facilities are provided by the 
U.S. Forest Service under a Memorandum,of Agreement. 
Project is complete. Construction of dam and appurtenant 
works was initiated in May 1963 and operation for 
flood control was effective in October 1968. Settlement of 
claims was completed in May 1974. Eugene Water and 
Electric Board made an application in April 1982 for 
permit to install two small hydropower units at Blue 
River Lake project. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: 
Normal operation and maintenance work performed. 
Freshets regulated by Blue River Lake project on Blue 
River, a major tributary of McKenzie River, are shown in 
Table 37-M. 
25. COTTAGE GROVE LAKE, OR 
Location. On Coast Fork of Willamette River, 29 
miles from mouth. Coast Fork rises in Douglas County, 
OR, on western slope of Cascade Range and northern 
slope of Calapooia Range, flows north for 49 miles, and 
unites with Middle Fork to form main Willamette River. 
Existing project. An earthfill dam, 1,750 feet long at 
crest, 114 feet high from lowest point of the general 
foundation, a concrete gravity free overflow spillway 
264 feet long near the right abutment, and a concrete 
gravity non-overflow section 96 feet long forming the 
right abutment. Total length of dam is 2,110 feet. Outlet 
works, consisting of three gate-controlled conduits, pass 
through spillway section. Reservoir provides 30,060 
acre-feet of usable flood control storage and controls 
runoff of drainage area of 104 square miles. Project is 
operated as a unit of coordinated reservoir system to 
protect Willamette River Valley and increase low waterflow 
for navigation and for other purposes. Recreational 
development consists of day use and overnight facilities 
at four sites operated by the Corps of Engineers. Construction 
of project initiated August 1940 was completed 
April 1952. Dam and reservoir have been in continuous 
operation since September 1942. 
Local cooperation. Development of additional 
recreation facilities will require a local sponsor willing to 
cost share and assume all operation and maintenance of 
park facilities. 
Operations during fiscal year. Maintenance: Contract 
awarded to replace supervisory control and data 
acquisition equipment. Normal operation and maintenance 
work continued. Freshets regulated by Cottage 
Grove Lake on Coast Fork Willamette River are shown 
in Table 37-M. 
26. DESCHUTES RIVER, BEND, OR 
Location. Deschutes River channel at River Mile 
168.2, just upstream of the city of Bend. Bend, Oregon is 
approximately 125 miles southeast of Portland, Oregon. 
Existing project. Flooding occurs in the city of Bend 
when ice accumulations block the flow of the Deschutes 
River. The flooding can occur during any normal discharge 
causing inundation of 112 dwellings. Plans to 
solve the flooding problem include construction of an ice 
boom. The ice boom would span the entire width of the 
river and would consist of timber units connected to a 
flexible steel cable, held in place with on-shore anchors. 
The boom would intercept most of the ice floes which 
would then consolidate and form an ice cover upstream 
of the boom. The boom would contain the ice in 
an unpopulated area upstream of the city where the ice 
collection and sub-sequent flooding would not cause 
any significant damage. 
Local cooperation. Fully complied with. The City of 
Bend is the project sponsor. 
Operations during fiscal year. New work. Contract 
for construction of the ice boom was advertised. 
Completion of construction is scheduled in the first 
quarter of FY 1988. 
27. DORENA LAKE, OR 
Location. On Row River, OR, 7 miles from mouth. 
Row River rises in Lane County on western slope of 
37-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Cascade Range, flows northwest for 19 miles, and enters 
Coast Fork of Willamette River 19.5 miles above mouth. 
Existing project. An earthfill embankment dam, 
3,352 feet long at crest and 145 feet high from lowest 
point of the general foundation. Concrete gravity freeoverflow 
spillway, 200 feet long, forms right abutment. 
Outlet works on five slide-gate-controlled conduits pass 
through spillway section. Reservoir provides 70,500 
acre-feet of usable flood control storage and controls 
runoff of 265 square miles. The Project is operated as a 
unit of coordinated reservoir system to protect Willamette 
River Valley and increase low waterflows for 
navigation and other purposes. Construction of project 
initated June 1941 was completed October 1952 except 
for construction of additional recreation facilities that 
were funded under the Code 710 program. Future recreation 
facility construction will be accomplished in accordance 
with the cost-sharing contract with Lane County, 
OR. Dam and reservoir have been in continuous operation 
since November 1949. 
Local cooperation. A multiple project cost sharing 
agreement has been in force with Lane County since 
Sept. 1976. It includes 4 projects and 13 parks. At Dorena 
Lake, 6 parks included in the agreement are managed by 
Lane County under a lease agreement. Future recreation 
development will require a supplement to the cost sharing 
agreement. 
Operations during fiscal year. Maintenance: Contract 
awarded to replace supervisory control and data 
acquisition equipment. Normal operation and maintenance 
continued. Freshets regulated by Dorena Lake 
project on Row and Coast Fork Willamette Rivers are 
shown in Table 37-M. 
28. ELK CREEK LAKE, ROGUE RIVER BASIN, 
OR 
Location. In Jackson County, OR at River Mile 1.7 on 
Elk Creek, a tributary of Rogue River, about 26.5 miles 
northerly from Medford, OR. 
Existing project. Construction work continues to 
provide for a 249-foot high roller compacted concrete 
gravity dam, 2,600 feet long at the crest, with a gate 
controlled concrete chute spillway, regulating outlet 
conduits, power penstock and multiple use intake tower 
attached to the upstream face of the dam. Reservoir 6.2 
miles long will provide 95,000 acre-feet of usable storage 
for flood control and water conservation utilization. Project 
will control runoff from a drainage area of 135 
square miles. Reservoir will be operated to provide future 
municipal and industrial water supply, irrigation, fish 
and wildlife enhancement, water quality control, and 
recreation benefits. 
Construction of the project was initiated in February 
1971. Work completed to date includes construction of a 
bypass road to route traffic away from the damsite and 
stockpiling of gravels to be used in the main dam and 
relocated roads. All lands for the project have been 
acquired with the exception of the clearing of water 
rights for a seemingly abandoned irrigation canal 
which originates within the project boundaries. Final 
environmental statement was filed with Council of 
Environmental Quality June 15, 1972 and Supplement 
No.1 addressing water quality and social/demographic 
information was filed with EPA on December 24, 1980. 
Estimated Federal cost of project is $119,000,000. 
Local cooperation. Authorizing act requires that 
State of Oregon take action prior to construction to 
insure maintenance in stream of flow to be released for 
fishery. In addition, costs allocated to irrigation would 
have to be repaid in a manner and to an extent consistent 
with the U.S. Bureau of Reclamation laws and policies. 
On February 24, 1966, State of Oregon Water 
Resources Board filed for withdrawal rights of 25 cubic 
feet per second to maintain minimum flow for fish. 
Development of recreation facilities require a local sponsor 
willing to cost share in recreation development and 
assume all operations and maintenance of park 
facilities. 
Operations during fiscal year. In October 1985, 
NPP was advised by Oregon Natural Resources Council 
(ONRC) an environmental group, they intended to file 
suit against the government to halt construction of Elk 
Creek, on specific environmental issues. A hearing on the 
motion for a preliminary injunction was scheduled 
before Oregon Federal District Court 16, December 86. 
On that date, the Court refused to grant the injunction to 
halt construction and bids were opened and the contract subsequently 
awarded to Ohbayashi Corp. An appeal was 
filed by ONRC in March, 1986 and heard by the 9th 
Circuit Court in July, 1986. 
On 23 June 1987, the Circuit Court reversed the 
decision of the District Court and returned the case to the 
District Court for appropriate injunctive relief The 
resulting District Court order issued in Aug. and Sep. 
1987 allows construction of the dam to El. 1563 ft. 
(approximately 1/3 the height of the dam), backfilling of 
a foundation key trench, aggregate processing, quarry 
restoration, and other miscellaneous work. 
The Department of Justice has petitioned the 9th 
Circuit Court for a rehearing. Depending on whether the 
hearing is granted and the outcome of that hearing, may 
require termination of the existing main dam contract. 
29. FALL CREEK LAKE, OR 
Location. On Fall Creek, a tributary of Middle Fork 
Willamette River, about 7 miles above confluence of the 
streams and about 19 miles southeasterly of Eugene, 
OR. r 
Existing project. An earth-and-gravel fill embankment 
about 5,100 feet long at crest and 193 feet high from 
lowest point of the general foundation. A gated concrete 
gravity spillway is in left abutment. Outlet is in right 
abutment. Reservoir provides 115,000 acre-feet of usable 
flood control storage and is operated as a unit of coordinated 
reservoir system to protect Willamette River Valley 
and increase low waterflows for navigation and 
other purposes. 
Construction of project began May 1962 and was 
essentially complete November 1965. Reservoir storage 
for flood control was effective October 1965. Sky Camp 
Lodge was completed October 1978. Future recreation 
facilities will be provided in accordance with the costsharing 
contracts with Lane County and Bethel School 
District. 
37-12

PORTLAND, OREGON DISTRICT 
Local cooperation. Fall Creek Lake is included in 
the Lane County multiple project cost sharing agreement. 
Two parks are managed by Lane County under 
lease agreement. Future development will require a supplement 
to the cost sharing agreement. 
Operations during fiscal year. Maintenance: 
Nbrmal operation and maintenance work performed. 
Freshets regulated by Fall Creek Lake project on Fall 
Creek, a tributary of Middle Fork, Willamette River, are 
shown in Table 37-M. 
30. FERN RIDGE LAKE, OR 
Location. On Long Tom River, 23.6 miles from the 
mouth. Long Tom River rises in Lane County, OR, on 
eastern slope of Coast Range, flows north for 50 miles, 
and enters Willamette River 147 miles above its mouth. 
Existing project. A main dam, 6,624 feet long at 
crest and 49 feet high from lowest point of the general 
foundation and two auxiliary dikes, 915 and 3,929 feet 
long, along northeasterly boundary of lake. Main dam 
consists of an earthfill embankment dam 6,330 feet long, 
a concrete gravity spillway near left abutment with a 
non-overflow structure 46 feet long, containing outlet 
works, and an overflow structure, 248 feet long, controlled 
by six automatic gates. Project includes rectification 
of channel of Long Tom River downstream of dam. 
Reservoir provides 110,000 acre-feet of usable flood 
control storage and controls runoff of tributary drainage 
area of 275 square miles. Reservoir protects Long Tom 
River Valley and is operated as a unit of coordinated 
reservoir system to protect Willamette River Valley 
generally and to increase low water-flows for navigation 
and other purposes. Dam was originally constructed in 
1941 to height of 47 feet. Provision of additional storage 
for flood control was obtained in 1965 by raising 
embankments 2 feet to 49 feet above lowest point of the 
general foundation. 
Construction of project initiated April 1940 was completed 
August 1951, except for provision of additional 
storage for flood control authorized in 1962 and completed 
April 1965, and construction of additional recreation 
facilities funded through the Code 710 program. 
Dam and reservoir have been in continuous operation 
since December 1941. Development of future recreation 
facilities will be in accordance with the cost-sharing 
contract with Lane County, and requires a 50 percent 
contribution by the county. Development is subject to 
availability of funds by the Government and the county. 
Local cooperation. Fern Ridge Lake is included in 
the Lane County multiple project cost sharing agreement. 
Three parks are managed by Lane County under 
lease agreements. Future development will require a 
supplement to the cost sharing agreement. The Oregon 
Department of Fish and Wildlife manages 5,000 acres of 
land and water for migratory water fowl under a lease 
agreement. 
Operations during fiscal year. Maintenance: Contracts 
awarded to replace supervisory control and data 
acquisition equipment, rehabilitation of outlet works 
and bank protection at Fern Ridge Shores Location. 
Normal operation and maintenance continued. Freshets 
regulated by Fern Ridge Lake project on Long Tom River 
are shown in Table 37-M. 
31. FLOOD CONTROL WORK UNDER SPECIAL 
AUTHORIZATION 
Flood control activities pursuant to Section 205, 
Public Law 858, 80th Cong., as amended 
(preauthorization). 
See Table 37-L. 
Emergency bank protection (Section 14 of 1946 
Flood Control Act, Public Law 526, 79th Cong.). 
Fiscal year costs for preauthorization studies were: 
Mill Creek, OR $803 and Winchester Bay, OR $16,190. 
Emergency flood control activities-repair, 
flood fighting and rescue work (Public Law 99, 
84th Congress and antecedent legislation). 
Federal costs for fiscal year were: $225,339, disaster 
preparedness; $29,185, emergency operations; $465,939 
rehabilitation; $215,051, advance measures. 
Mt. St. Helens Emergency Measures. The May 18, 
1980 eruption of Mt. St. Helens dramatically altered the 
hydraulic and hydrologic regimes of the Cowlitz and 
Toutle River valleys. Volcanic debris substantially reduced 
the river's hydraulic capacity to the point where 
major flooding could be expected even with normal 
runoff. 
A major recovery program for the Cowlitz and Toutle 
Rivers funded under advance measures was initiated a 
short time after the eruption and was essentially completed 
during FY 1982. 
Total cost of Mt. St. Helens emergency measures, from 
initiation through FY 1987, with some contract modifications 
remaining to be negotiated, is $275,942,051. The 
authorized navigation channel on the Cowlitz between 
River Mile 0 and 4.2 remains unusable due to continued 
sedimentation. 
32. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Funds appropriated for inspection of completed local 
flood protection works are used to determine maintenance 
condition of completed works and to ascertain 
whether those works are being properly maintained by 
local interests. A total of 47 leveed areas and 264 bank 
protection works were inspected at various locations 
along both banks of Lower Columbia River below Bonneville 
Dam, along Oregon Coast, in eastern Oregon, in 
southern Oregon and in Willamette River Basin. Of this 
total, 41 leveed areasin Oregon and 6 leveed areas in 
Washington were inspected during FY 1987. A representative 
of sponsoring districts accompanied the Portland 
District representatives performing the levee inspections. 
Aerial inspection of revetments in Willamette 
River Basin was supplemented by an onsite inspection 
at locations requiring maintenance. Deficiencies in 
maintenance and need for repairs were discussed with 
sponsoring districts' representatives and a report was 
made to each sponsor with recommendations for 
improving maintenance. The program to improve maintenance 
of completed Federal projects initiated by House 
37-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Appropriations Committee on Civil Functions was continued. 
Periodic contact was maintained with uncooperative 
areas reported in FY 1986 and 1987 to ascertain 
any change in attitude and to provide technical assistance, 
if requested. Of the 81 sponsors for some 125 local 
flood protection projects inspected in Portland District, 
19 were reported deficient in maintenance. Fiscal year 
costs were $196,245 and total costs to September 30,1987 
were $1,443,533. 
33. INSPECTION OF NON-FEDERAL FLOOD 
PROJECTS 
Annual inspections and evaluations are made of flood 
control works constructed by non-federal agencies. 
These evaluations are to determine eligibility for assistance 
under PL 84-99, of damages by flooding. This evaluation 
consists of an engineering study to determine 
degree of flood protection being provided, a tabulation of 
improvements within the protected area for cost-benefit 
studies and an inspection to determine compliance with 
maintenance agreements executed by the project sponsor 
and the Government. These inspections also serve a 
valuable disaster preparedness function in terms of 
explaining to local sponsors their preparedness responsibilities. 
All local sponsors are advised of the results of 
these evaluations and inspections. Approximately 20 
locations throughout the Portland District were evaluated 
under this feature during FY 1987 at a cost of 
$120,156. 
34. LOWER COLUMBIA RIVER BASIN, OR 
AND WA 
Location. On Columbia River and minor tributaries, 
channels, and sloughs, between Sandy River, OR, about 
15 miles east of Vancouver, WA, and mouth of Columbia 
River. 
Existing project. Plan for bank protection work, 
improvements to existing projects, and construction of 
flood control works in Lower Columbia River Basin provides 
for new construction and supplementing and 
extending projects constructed in Lower Columbia River 
Basin under authority of 1936 Flood Control Act: (a) 
Lower Columbia River Bank Protection, OR and WA 
provides for bank protection works at 96 locations on 
Columbia River and tributaries between Sandy River 
and mouth of Columbia River, totaling about 224,000 
linear feet. Estimated total Federal cost is $24,700,000 
and non-Federal cost is $1,435,000; (b) See Table 37-N on 
Levees and Improvements to Existing Works; (c) Lower 
Columbia River Basin levees at new locations, Oregon 
and Washington, provides for construction of flood control 
works at: Washougal area, Clark County, WA, about 
5.5 miles of levee and appurtenant works at a Federal 
cost of $1,803,488, and non-Federal cost at $98,000; and 
Vancouver Lake area in vicinity of Vancouver, WA, 
about 18 miles of levee and appurtenant works at an 
estimated Federal cost (1980) of $19,500,000 and non- 
Federal cost at $900,000. This portion, Vancouver Lake, 
WA, has been reclassified "deferred". Total estimated 
Federal costs (1980) for both areas of work are 
$21,303,488 and non-Federal costs $998,000. Federal cost 
for all work under project, Lower Columbia River Basin, 
OR, and WA, is $67,458,776. 
Construction of improvement to existing project in 
Sandy Drainage District, OR, was completed by local 
interests at no construction cost to the Government. 
Improvements of levees have been accomplished by contract 
at the following locations: Multnomah County 
Drainage District, No. 1, OR, June 1962; Sauvie Island 
Drainage District, OR, October 1962; Woodson Drainage 
District, OR, December 1963; Rainier Drainage District, 
OR, June 1964; Cowlitz County Diking Improvement 
District, No. 15, WA, December 1965; Cowlitz County 
Diking Improvement Districts, Nos. 2 and 13, WA, June 
1965; Midland Drainage District, OR, April 1967; Cowlitz 
County Consolidated Diking Improvement District, 
No. 2, WA, June 1974; Beaver Drainage District, OR, 
June 1978; Wahkiakum County Consolidated Diking 
District #1, WA, October 1979; and Scappoose Drainage 
District, OR, September 1980. Washougal Area, WA, 
(new location) levee construction has been completed. 
Under authorization for Lower Columbia River Basin 
bank protection works, construction has been completed 
at numerous locations. (See Section 44 for additional 
information). 
Local cooperation. Flood Control act of 1950 provides 
local interests furnish lands and rights-of-way; 
make necessary highway, highway bridge, and utility 
alterations; hold the United States free from damages; 
and maintain and operate completed works. Total non- 
Federal cost for all work is $4,567,000. For details of 
status or requirements of local cooperation, see individual 
project reports. 
Operations during fiscal year. See individual 
projects. 
35. LOWER COLUMBIA RIVER BASIN BANK 
PROTECTION, OR AND WA 
Location. On Columbia River and tributaries 
between Sandy River, OR, and mouth of Columbia 
River. 
Existing project. Provides for construction of 
224,000 linear feet of bank protection works at 96 locations 
along Lower Columbia River below River Mile 125 
and along principal tributaries in this reach, to protect 
existing improvements such as levees and developed 
industrial lands from further erosion. Existing project is 
a unit of general comprehensive plan for flood control, 
navigation, and other purposes in Columbia River 
Basin. Construction of project began in July 1961 and is 
88 percent complete. A total of 191,000 linear feet of bank 
protection work at 84 locations has been completed. 
Estimated Federal cost is $24,700,000. 
Local cooperation. Flood Control Act of 1950 provides 
local interests furnish lands and rights-of-way; 
make necessary highway, highway bridge, and utility 
alterations; hold the United States free from damages; 
and maintain and operate works after completion. 
Under Section 103 of the Water Development Act of 1986, 
Local Interests will also be required to make a cash 
contribution for construction of each site. Estimated 
costs for all requirements of local cooperation are 
$1,435,000. 
Operations during fiscal year. Tansy Railroad 
location near the cities of Hammond and Warrenton, OR 
37-14 
_ _II_ __ ___-_ _I_____ ____~___~ II____________I_ I__ ~L-IR~-I C-~~- -I-Y- -I~ --L--I-~- ~----_____ __-_I~_ ___ III_____I~--~--YIY-------- 

PORTLAND, OREGON DISTRICT 
was completed (3,840 linear feet). Protective work as 
Lerch location (700 linear feet) on Sauvie Island Drainage 
District, and 128th Avenue location (250 linear feet) 
at Multnomah County Drainage District No. 1 was 
initiated. 
36. MOUNT ST. HELENS & VICINITY, WA 
Location. Along the Cowlitz and Toutle Rivers from 
Spirit Lake at the base of Mt. St. Helens to the confluence 
of the Cowlitz with the Columbia River (River Mile 68) 
approximately 55 miles downstream from Portland, Or. 
Existing project. The May 18, 1980 eruption of Mt. 
St. Helens dramatically altered the hydraulic and 
hydrologic regimes of the Cowlitz and Toutle River valley. 
Mudflows triggered by the eruption carried large 
volumes of sediment from the debris avalanche into 
these river valleys, reducing the hydraulic capacity to 
the point where major flooding could be expected with 
even normal runoff. Storm runoff and surface drainage 
continue to deliver sediment from the debris avalanche 
into the rivers. Funds allocated under Public Law 84-99 
were used for major recovery work on the Cowlitz and 
Toutle rivers. 
In late FY 1983, interim flood control measures were 
implemented under the authority of Public Law 98-63 to 
assure 100-year flood protection to developed areas 
along the Cowlitz River. Measures implemented are 
primarily dredging on the Cowlitz and Toutle Rivers and 
a monitoring program. 
Local cooperation. Local sponsors are responsible 
for obtaining any additional lands easements and 
rights-of-way. The State of Washington has agreed to act 
as the local sponsor. State funds have been appropriated 
for acquisition of lands and related expenses for Mt. St. 
Helens recovery operations. The State of Washington 
has spent over $2,500,000 to procure disposal sites for 
dredged material. 
Operations during fiscal year. A contract to 
remove sediment from the Lower Toutle River was 
awarded in late November 1986. A total of 2.5 million 
cubic yards was removed at LT-3 and LT-1 through April 
1987, at a cost of $1,192,000. Two additional contracts to 
remove sediment from LT-1, and LT-3 are underway at 
this time. 
37. MT. ST. HELENS SEDIMENT CONTROL, WA 
Location. On the North Fork Toutle River, 2 miles 
upstream from its confluence with the Green River, in 
Cowlitz County, southwest Washington. The river systems 
impacted by the project include Toutle, Cowlitz and 
Columbia Rivers. Most of the population affected by the 
problems reside in the communities of Longview, Kelso, 
Lexington and Castle Rock, Washington. 
Existing Project. The project was authorized by the 
Supplement Appropriations Act, 1985 (Public Law 88, 
99th Congress, August 15, 1985). The Act includes 
authorization "... to construct, operate and maintain a 
sediment retention structure near the confluence of the 
Toutle and Green Rivers, Washington, with such design 
features and associated downstream actions as are 
necessary, in accordance with the Feasibility Report of 
the Chief of Engineers dated December 1984." 
The project will provide a permanent solution to 
potential flooding on the Cowlitz River from sedimentation 
problems created by the eruption of Mt. St. Helens. 
The Decision Document recommended construction of a 
single sediment retention structure (SRS) with a 125-foot 
high spillway at the Green River site on the North Fork 
Toutle River, improvements to the levee system at Kelso, 
Washington, and dredging downstream from the SRS. 
Local cooperation. Local interests are responsible 
for provision of all lands, easements, and rights-of-way 
for the sediment retention structure, dredging disposal 
areas, and levee improvements. Local interests are also 
responsible for all alterations and relocations of buildings, 
roads, bridges and other structures or utilities 
made necessary by implementation of the project. In 
addition, operation and maintenance of fish facilities, 
the levee system at Kelso and dredged material disposal 
sites will be the responsibility of local interests. Nonfederal 
cash contribution is $3,500,000 and the estimated 
non-federal land, easements, right-of-ways, and relocations 
costs are $20,800,000. 
Operations during fiscal year. The Sediment Retention 
Structure contract was awarded in December 
1986 at a cost of $56,490,770 and is scheduled for completion 
in FY 1990. 
38. SCHEDULING FLOOD CONTROL RESERVOIR 
OPERATIONS 
Corps of Engineers monitored flood control operations 
at four Bureau of Reclamation projects (Prineville, 
Ochoco, Emigrant, and Scoggins) and (Mossyrock) a 
municipal power project operated by Tacoma City Light. 
The Bureau of Reclamation projects were partially constructed 
with flood control funds, thereby subjecting project 
operation to monitoring by the Corps of Engineers 
under Section 7, Flood Control Act of 1944. Monitoring of 
Mossyrock flood control operation is assigned to the 
Corps by the Federal Energy Regulatory Commission as 
the Mossyrock license calls for specific flood control regulation. 
Under licensing agreement, the Tacoma City 
Light utility is required to provide 360,000 acre-feet of 
flood storage by December of each year. The Bureau of 
Reclamation sponsored projects were operated satisfactorily 
during FY 1986 for flood control. At Mossyrock 
there were no significant high water periods in 1986. 
Peak discharges at Castle Rock were below the regulation 
goal of 70,000 cubic feet per second during the flood 
season. The spring snowmelt runoff was much below 
normal with very little precipitation during October 
through December period. Preparation of Reservoir 
Regulation Manuals for Scoggins and Mossyrock Projects 
is scheduled. Total cost of monitoring the five projects 
during FY 1987 was $5,352. 
39. WILLAMETTE RIVER BASIN, OR 
Location. Willamette River, formed by Coast and 
Middle Forks which join a few miles above Eugene, OR, 
flows north 189 miles, and enters Columbia River 101.5 
miles about its mouth. The basin has an area of 11,200 
square miles and lies between Cascade Range on the 
east and Coast Range on the west. Major tributaries of 
Willamette River rise in Cascade Mountains and consist 
of Coast and Middle Forks and McKenzie, Calapooia, 
37-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Santiam, Molalla, and Clackamas Rivers. Important 
tributaries that head in the Coast Range are Luckiamute, 
Yamhill, and Thalatin Rivers, Minor tributaries, all 
of which enter the main stream from the west, are Long 
Tom River, Marys River, and Rickreall Creek. 
Existing project. Flood Control Act of 1938 
approved general comprehensive plan for flood control, 
navigation, and other purposes in Willamette River 
Basin and authorized funds for initiation and partial 
accomplishment of plan recommended for initial development: 
the reservoirs and related works to be selected 
by Chief of Engineers. Subsequent Flood Control Acts, 
1941 through 1974, authorized additional flood control 
and other works and increased monetary authority. 
Following projects were completed as authorized and 
are in continuous operation: Fern Ridge Lake, August 
1951; Cottage Grove Lake, April 1952; Dorena Lake, 
October 1952; Detroit Lake, December 1960; Lookout 
Point Lake, June 1961; Hills Creek Lake, June 1963; 
Cougar Lake, March 1964; Fall Creek Lake, November 
1965; Green Peter-Foster Lakes, June-December 1967 
respectively; and Blue River Lake, October 1968. Under 
the authorization for construction of recreation facilities 
at completed projects, work has been accomplished at 
Fern Ridge, Cottage Grove, Dorena, Lookout Point, and 
Fall Creek Lakes. Under the memoranda of agreements 
with the U.S. Forest Service, recreation facilities also 
have been constructed at Detroit, Lookout Point, Cougar, 
Blue River, and Hills Creek Lakes, Recreational facilities 
were constructed at Green Peter-Foster Lakes with 
initial construction funds. Details of operation, construction, 
and financial status of projects are in individual 
reports. 
During low-water season, July-September, supplemental 
water releases are made from Willamette River 
Basin Reservoirs. Uses which benefit from increased 
downstream flows include irrigation, navigation, power, 
fisheries, pollution abatement, and recreation. Although 
optimum regulation cannot be provided for every purpose, 
water released from reservoirs during the lowwater 
season for a particular purpose will usually provide 
benefits to other uses as well. Basic policy is to 
provide most beneficial overall regulation, consistent 
with established water-use priorities. (See Table 37-0 on 
Willamette River Basin comprehensive plan.) 
Local cooperation. Section 2, Flood Control Act of 
June 28, 1938 applies. Local cooperation for other projects 
is in individual reports for those projects. 
Operations during fiscal year. See individual 
reports. 
40. WILLAMETTE RIVER BASIN BANK 
PROTECTION, OR 
Location. On Willamette River and tributaries, 
between Cascade Range and Coast Range, from a point 
south:of Eugene to Portland, OR. 
Existing project. Provides for clearing, sloping, and 
reveting riverbanks; construction of pile and timber 
bulkheads and drift barriers; minor channel improvements; 
and maintenance of existing works for control of 
floods and prevention of erosion at various locations 
along Willamette River and its tributaries. The current 
scope of the project is a total of 510,000 linear feet of bank 
protection at 236 locations. Estimated Federal cost is 
$29,200,000. 
Construction of project began in 1938 and is 96 percent 
complete. A total of 489,795 linear feet of bank protection 
work at 230 locations consisting of revetment of riverbanks, 
pile and timber bulkheads, drift barriers, and 
channel improvements, have been completed on Willamette 
River and tributaries. 
Local cooperation. Section 3, Flood Control Act of 
1936 and Section 103, Water Resources Development Act 
of 1986 applies. Estimated costs for all requirements of 
local cooperation under terms of project authorization 
were $2,239,000. 
Operations during fiscal year. No construction 
was conducted during the fiscal year. 
Maintenance: Annual inspection of revetments was 
made by helicopter in July 1987. 
41. WILLOW CREEK LAKE, HEPPNER, OR 
Location. On Willow Creek immediately upstream 
from Heppner and just downstream from junction of 
Balm Fork and Willow Creek in Section 35, Township 2 
South, Range 26 East, Willamette Meridian. 
Existing project. Project provides flood protection to 
the city of Heppner and downstream area by controlling 
runoff from a drainage area of 96 square miles. The dam 
is a roller compacted concrete structure 160 feet high at 
crest elevation 2,130. Ancillary features include a center 
uncontrolled spillway with a maximum flood capacity of 
93,300 cfs, (cubic feet per second) an outlet works with a 
capacity of 500 cfs, a minor flow works and diversion 
works. Gross storage capacity of the project is 13,250 
acre-feet, consisting of 7,750 acre-feet for exclusive flood 
control, 1,750 acre-feet for joint flood control and irrigation, 
1,750 acre-feet exclusive irrigation, and 2,000 acrefeet 
dead storage for fish, wildlife, recreation, sediment 
accumulation, and aesthetics. Limited recreation facilities 
are being provided. 
The final Environmental Impact Statement was filed 
with the Environmental Protection Agency on 
December 20,1979. The provisions ofthe Clean Water Act 
were met by a Section 404(b)(1) Evaluation and a public 
notice issued January 12,1980, and a Section 401 certification 
from the State of Oregon on February 15, 1980. 
Land acquisition is about 99 percent complete. 
Local cooperation. None required. Development of 
recreation facilities will require cost sharing with a nonfederal 
local sponsor. 
Operations during fiscal year. New work: (See 
Walla Walla, WA District Annual Report.) 
Maintenance: Normal operation and maintenance 
performed. 
Multiple-Purpose Projects, 
Including Power 
42. BONNEVILLE LOCK AND DAM-LAKE 
BONNEVILLE, OR AND WA 
Location. Project is on Columbia River, 40 miles east 
37-16

PORTLAND, OREGON DISTRICT' 
of Portland, OR, about 146 miles above mouth of river. 
For description of Columbia River, see Section 4. 
Existing project. A dam, powerplant, and lock for 
power and navigation. Spillway dam extends across 
main channel from Cascade Island shore to Bradford 
Island. Overflow crest at 24 feet above mean sea level is 
surmounted by 18 vertical-lift steel gates, 10 with remote 
control hoists placed between piers which extend to elevation 
99 feet where a service roadway provides access, 
and two 350-ton gantry cranes for regulating gates. 
Powerhouse No. 1 extending across Bradford Slough to 
the Oregon shore has an installation of 10 units, consisting 
of two units of 43,200 kilowatts and eight units of 
54,000 kilowatts each, totaling 518,400 kilowatts. Ordinary 
and extreme fluctuations of river at lower lock gate 
are about 21 and 47 feet respectively. Project includes 
fish ladders to serve both main channel, Bradford 
Slough channel, and Powerhouse II channel. Navigation 
lock and powerhouses are founded on andesite, and 
main dam rests upon solidified sedimentary rock of 
volcanic origin. The pool created by dam provides a 
navigable channel 15 feet deep between Bonneville and 
The Dalles Dams, a distance of 47 river miles. Principal 
data concerning navigation lock spillway dam, and 
powerplant are set forth in Table 37-P. 
Dam, navigation lock, 10-unit power generating 
installation, fishways, and attendant buildings and 
grounds cost $83,239,395, of which $6,072,480 is for navigation 
facilities, $39,350,824 for power facilities and 
$37,816,091 for joint facilities, consisting of dam, fishways, 
buildings and grounds, and headwall section of 
power units 0 to 6, cost of which $2,106,000 is allocated to 
dam and lake facilities. 
In response to flow regulations and peakings from 
upstream plants operating under conditions of Canadian 
storage and Pacific Northwest -Southwest Intertie, 
two modifications were undertaken at the Bonneville 
project. The modification for peaking project was undertaken 
to minimize adverse environmental effects under 
rapidly changing flow conditions from upstream dams. 
The project was completed in 1978 at a cost of 
$27,195,000. The second modification provides for 
increased power installation by building a second powerhouse 
located on the Washington shore adjacent to the 
end of the existing spillway. The new powerhouse contains 
eight units of 66,500 kilowatts each and two fish 
attraction turbine generator units of 13,100 kilowatts 
each for a combined capacity of 558,200 kilowatts, bringing 
the entire Bonneville capacity to 1,076.6 megawatts. 
Additional fish facilities consist of the powerhouse collection 
system, second fish ladder on the Washington 
shore, transportation channel connecting the Cascade 
Island fish ladder with new exit control section, and 
fingerling bypass facilities which include fish screens in 
bthihe powerhouses. To provide for the anticipated 
increased visitor use, onsite visitor facilities are 
included. Under authority of the Bonneville Project Act 
(August 20, 1937), a letter from Bonneville Power Administration 
to North Pacific Division dated January 21, 
1965, requested construction of a second powerhouse. 
Construction of project started October 1933, was 
completed February 1953. Modification of powerhouse 
control equipment started March 1957, was completed 
September 1958. First two power units were placed in 
operation during fiscal year 1938. Powerhouse with 
complete installation of 10 units, was in operation 
December 1943. 
Construction of modification for peaking work commenced 
in September 1970 and was completed in September 
1978. 
Construction of second powerhouse is near completion. 
Final environmental impact statement was filed 
with Council on Environmental Quality in April 1972. 
In response to increasing visitation which now exceeds 
800,000 a year at the dam site itself and 1,500,000 projectwide, 
a visitor center with windows into the fish ladders, 
a 60-seat theatre, exhibits and displays was completed in 
1975. Units 11 through 18 were on-line by October, 1982. 
The visitor facility for the new powerhouse (which does 
not require cost-sharing) is an integral part of that structure. 
Estimated cost for construction of second powerhouse 
is $672,000,000. 
A cost sharing agreement between The Corps and 
Skamania County has been finalized. Development of 
recreation facilities is now under way at Home Valley 
and is expected to be completed in 1988. 
Through September 1987 power generation totaled 
195.4 billion kilowatt-hours. Of the gross income from 
sale of this power by Bonneville Power Administration, 
$289,924,572 was reimbursed to the U.S. Treasury to 
recover Corps of Engineers project investment and 
operating costs. 
Local cooperation. None required, except for non- 
Federal cost-sharing for development of recreational 
facilities. 
Operations during fiscal year. New work: Construction 
continued on restoration of areas disturbed by 
powerhouse construction. Final stages of the juvenile 
bypass system and monitoring facilities were under 
construction. Correction of deficiencies in fish guidance 
efficiency at the Second Powerhouse will reduce fingerling 
mortality incurred during annual downstream 
migration. 
Maintenance: The First Powerhouse modernization 
program continues to be implemented. Normal operation 
and maintenance was performed during period. 
During the fiscal year 5,118,603,000 kilowatt-hours of 
electrical power energy were generated, of which 
5,095,385,000 kilowatt-hours were delivered to Bonneville 
Power Administration, the marketing agency. Traffic 
through the navigation lock consisting ofrafted logs, 
petroleum products, grains, and miscellaneous cargo. 
43. COUGAR LAKE, OR 
Location. At mile 4.4 on South Fork McKenzie River 
which joins McKenzie River about 56.5 miles above its 
confluence with Willamette River. Project is about 42 
miles east of Eugene, OR. 
Existing project. A rockfill dam with an impervious 
earth core, about 1,738 feet long at crest and 445 feet high 
above the streambed. Reservoir is 6 miles long with 
37-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
storage capacity at full pool of 219,000 acre-feet and 
controls runnoff of tributary drainage area of 210 square 
miles. Spillway is on right abutment and outlet and 
power tunnels in left abutment. Outlet tunnel is provided 
with a chute and stilling basin. Powerplant consists of 
two 12,500 kilowatt units with minimum provisions for 
installing a third unit of 35,000 kilowatts for future peaking 
capacity. Improvement functions as a unit in coordinated 
system of reservoirs for multiple-purpose development 
of water resources in Willamette River Basin. 
Recreation facilities are provided by the U.S. Forest Service. 
Also authorized (but unconstructed) is a reregulating 
dam, Strube Lake, below Cougar Lake, which would 
permit Cougar to operate as a peaking powerplant. The 
Strube dam would contain two units totalling 4,600 
kilowatts. 
Construction of project initiated June 1956 is complete, 
excluding Strube Lake and Cougar Additional 
Urvit for which planning is essentially complete. Also, 
plans and specifications for the first construction contract 
(relocations) have been completed. Generating 
units 1 and 2 were placed in commercial operation 
March 23 and February 4, 1964, respectively. Physical 
n--service date for flood control was November 29, 1963. 
1'hrough September 1987 power generation totaled 3.1 
billion kilowatt-hours. Of the gross income from sale of 
this power by Bonneville Power Administration, 
$16,518,795 was reimbursed to the U.S. Treasury to recover 
Corps of Engineers project investment and operating 
costs. Estimated Federal cost of Strube Lake and 
Cougar Additional Unit is $106,000,000. 
Local cooperation. None required. 
Operations during fiscal year. New work: Continuation 
of negotiations for the innovative financing of 
Strube Lake and Cougar Additional Unit. 
Maintenance: Work continued to replace turbine 
runners. Normal operation and maintenance continued. 
During fiscal year, 118,814,000 kilowatt-hours of electrical 
energy were generated at project, of which 
117,983,000 kilowatt-hours were delivered to Bonneville 
Power Administration, the marketing agency. Freshets 
regulated by Cougar Lake on South Fork McKenzie 
River are shown on Table 37-M. 
44. DETROIT LAKE, OR 
Location. On North Santiam River with dam 50 
miles from mouth 45 miles southeast of Salem, OR. 
North Santiam River flows north and west for 85 miles, 
and unites with South Santiam River to form Santiam 
River, which 10 miles downstream enters Willamette 
River 108 miles above its mouth. 
Existing project. Main dam and a reregulating dam, 
both with power-generating facilities. Detroit Dam is a 
concrete gravity structure about 1,522 feet long and 454 
feet high from lowest point of the general foundation to 
roadway deck. Spillway is a gate-controlled overflow 
section, and outlet works are gate-controlled conduits 
through dam. Powerhouse with two units having a 
capacity of 50,000 kilowatts each is in right abutment 
immediately below dam. Reservoir has a storage capacity 
at full pool of 454,900 acre-feet and controls runoff of 
tributary drainage area of 438 square miles. It is being 
operated as a unit in coordinated reservoir system to 
protect Willamette Valley from floods, to increase low 
water flows in interest of navigation and irrigation, to 
generate power, and for other purposes. Reregulating 
dam 3 miles downstream at Big Cliff site is concrete 
gravity type, about 191 feet high from lowest point of the 
general foundation to roadway deck. Power installation 
consists of one unit with a capacity of 18,000 kilowatts. 
Reservoir has a storage capacity of 5,930 acre-feet at full 
pool. Project is a unit of comprehensive plan for flood 
control and other purposes in Willamette Basin. Recreation 
facilities are provided by the U.S. Forest Service, 
Oregon State Park System and the town of Detroit. 
Construction of project begun in May 1947 was 
completed December 1960. The two powerhouse generating 
units were placed in commercial operation June and 
October 1953. At Big Cliff powerhouse, single generating 
unit was placed on-line June 1954. Use of Big Cliff 
Dam for reregulating fluctuating flow from Detroit units 
was effected October 1953. Through September 1987 
power generation totaled 16.9 billion kilowatt-hours. Of 
the gross income from sale of this power by Bonneville 
Power Administration, $55,810,015 was reimbursed to 
the U.S. Treasury to recover Corps of Engineers project 
investment and operating costs. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: 
Normal operation and maintenance continued. During 
fiscal year 405,199,000 kilowatt-hours of electical energy 
were generated at project of which 401,983,000 kilowatthours 
were delivered to Bonneville Power Administration, 
the marketing agency. Freshets regulated by the 
Detroit Lake project on North Santiam River are shown 
in Table 37-M. 
45. GREEN PETER-FOSTER LAKES, OR 
Location. At approximate mile 5.5 on Middle Santiam 
River which joins South Santiam River about 56.8 
miles above its confluence with Willamette River. Dam 
is about 30 miles southeast of Albany in Linn County, 
OR. 
Existing project. Main dam and a reregulating dam, 
both with power-generating facilities. Green Peter Dam 
is a concrete gravity structure, 1,400 feet long and 385 
feet high above the lowest point of the general foundation 
with a gate-controlled spillway. Outlet works consist 
of two conduits through spillway, discharging into a 
stilling basin. Powerplant, on right bank adjacent to 
spillway stilling basin, consists of two units with an 
installed capacity of 80,000 kilowatts. Reservoir provides 
storage capacity at full pool of 430,000 acre-feet, 
extending 6,5 miles up Quartzville Creek and some 7.5 
miles up Middle Santiam River above creek junction, 
forming a Y-shaped pool. Reservoir controls runoff of 
tributary drainage area of 277 square miles. 
Foster Dam, 7 miles downstream from Green Peter 
Dam is located on South Santiam River about 38 miles 
above its confluence with Santiam River and 1.5 miles 
below its confluence with Middle Santiam River. Foster 
Dam consists of an earth, gravel, and rock-filled 
embankment, 146 feet high from lowest point of the 
general foundation and a concrete gravity gate 
37-18

PORTLAND, OREGON DISTRICFT 
controlled spillway and stilling basin for a total length 
of 4,800 feet. Power installation consists of two units 
with a capacity of 20,000 kilowatts. Foster Lake has a 
storage capacity, at full pool, of 61,000 acre-feet. Project 
functions as a unit in coordinated system of reservoirs 
for multiple-purpose development of water resources in 
Willamette River Basin. 
All construction on Green Peter-Foster Lakes project 
initiated June 1961 is completed. Green Peter Lake was 
placed in operation for useful flood control June 1967 as 
a unit of coordinated reservoir system for protection of 
the Willamette River Basin. First power-generation unit 
was placed on the line June 9, 1967 and second, June 28, 
1967. Use of Foster Lake for reregulating fluctuating 
flows from Green Peter units was effective December 
1967. First power generation unit was placed on-line 
August 22, 1968 and second, September 6, 1968. Through 
September 1987 power generation totaled 6.9 billion 
kilowatt-hours. Of the gross income from sale of this 
power by Bonneville Power Administration, $38,747,416 
was reimbursed to the U.S. Treasury to recover Corps of 
Engineers project investment and operating costs. 
Local cooperation. Future recreation development 
at Foster or Green Peter will require cost sharing. 
Recreation facilities at Foster Lake includes 3 parks and 
2 parks at Green Peter Lake. These parks were developed 
by the Corps and are operated by Linn County under 
lease agreement. 
Operations during fiscal year. Maintenance: 
Normal operation and maintenance continued. During 
the fiscal year 290,387,000 kilowatt-hours of electrical 
energy were generated at project of which 287,618,000 
kilowatt-hours were delivered to Bonneville Power 
Administration, the marketing agency. Freshets regulated 
by Green Peter Lake project on Middle Santiam 
River are shown in Table 37-M. 
46. HILLS CREEK LAKE, OR 
Location. On the Middle Fork, Willamette River, 47.8 
miles from mouth and 26.5 miles upstream from Lookout 
Point Dam. Middle Fork, Willamette River rises on west 
slope of Cascade Range and flows northwesterly to its 
junction with Coast Fork, Willamette River. Dam is 
about 45 miles southeast from Eugene, OR. 
Existing project. An earth-and-gravel-fill dam 
about 2,150 feet long at the crest and 338 feet above 
lowest point of the general foundation. A gate-controlled 
concrete gravity chute-type spillway is in right abutment. 
Diversion tunnel, outlet tunnel and power tunnel 
are in same abutment. Powerhouse with two 15,000 
kilowatt units is located next to spillway. Hills Creek 
Lake is about 8.5 miles long and provides storage capacity 
at full pool of 356,000 acre-feet. Project controls runoff 
of drainage area of 389 square miles and is an integral 
unit of comprehensive plan for development of water 
resources of Willamette River Basin. Hills Creek Lake 
and Lookout Point Lake are operated as a unit for control 
of floods and generation of power on Middle Fork Willamette 
River. These projects, in conjunction with Dexter 
reregulating dam and Fall Creek Lake flood control 
system, will effectively control floods on Middle Fork 
and provide maximum efficient generation of hydroelectric 
power. Recreation facilities are provided by the 
U.S. Forest Service. Hills Creek power units are remote 
controlled from Lookout Point. 
Construction of project, initiated May 1956, was completed 
June 1963. The project was placed in service for 
useful flood control in November 1961. On May 2, 1962, 
the two power units were placed on-line. Through September 
1987 power generation totaled 4.0 billion 
kilowatt-hours. Of the gross income from sale of this 
power by Bonneville Power Administration, $16,708,714 
was reimbursed to the U.S. Treasury to recover Corps of 
Engineers project investment and operating costs. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: 
Normal operation and maintenance continued. During 
fiscal year 138,627,000 kilowatt-hours of electrical power 
were generated, of which 138,144,000 kilowatt-hours 
were delivered to Bonneville Power Administration, the 
marketing agency. Freshets regulated by Hills Creek 
Lake on Middle Fork Willamette River are shown in 
Table 37-M. 
47. JOHN DAY LOCK AND DAM-LAKE 
UMATILLA, OR AND WA 
Location. On Columbia River about 3 miles downstream 
from mouth of John Day River and about 215 
miles above mouth of Columbia River. 
Existing project. A dam, powerplant, navigation 
lock, fish ladders, and appurtenant facilities with a 
slack-water lake about 75 miles long extending to 
McNary Lock and Dam. Included is relocation of railroads, 
highways, utilities, and communities affected by 
the impoundment. The project as originally authorized 
would have provided 2,000,000 acre-feet of flood control 
storage. As modified, the project provides 500,000 acrefeet 
of flood control storage between elevations 257 and 
268. The structure is 5,900 feet in length and stands 
about 161 feet above streambed. Powerhouse has space 
for 20 generating units of 135,000 kilowatts each; 16 
units have been installed for a present capacity of 
2,160,000 kilowatts. Principal project data are set forth 
in Table 37-P. 
A detailed description of project as authorized and 
modified is on pages 1992 and 1993 of Annual Report for 
1962 under the Walla Walla District. 
Construction began July 1958 and the project was 
opened to navigation April 1968. The main dam contract 
is complete. Lock rehabilitation work begun in FY 1980 
was completed in FY 1986. Entire project is estimatedto 
be 99 percent complete. Through September 1987 power 
generation totaled 200.1 billion kilowatt-hours. Of the 
gross income from sale of this power by Bonneville 
Power Administration, $248,831,493 was reimbursed to 
the U.S. Treasury to recover Corps of Engineers project 
investment and operating costs. Estimated Federal cost 
of new work is $512,523,000, consisting of $512,190,000 
Corps of Engineers and $333,000 for Coast Guard navigation 
aids. 
Local cooperation. Recreation facilities at 4 parks 
are operated and maintained by local agencies under 
lease agreement with the Corps. Irrigon Park was 
37-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
expanded under cost sharing agreement and is managed 
by the Irrigon Park and Recreation Commission. 
Any future recreation development will require cost 
sharing. 
Operations during fiscal year. New work: Construction 
of the juvenile fish by-pass system began in 
January 1984 and is 99% complete. The by-pass facility 
consists of a collection system of submersible traveling 
screens, a conduit mined above the intakes to each 
turbine-generator unit and across the length of the powerhouse, 
a conduit extending from the powerhouse to an 
outfall structure downstream, and an intake gantry 
crane to handle fish facilities equipment. The juvenile 
by-pass system work is fully operational and work on 
remaining sites is anticipated to be completed by April 
1988. 
Maintenance: Contract awarded to upgrade the existing 
spillway gate position indication and control system. 
Normal operation and maintenance continued. 
During fiscal year 9,301,770,000 kilowatt-hours of electrical 
power were generated by the 16 generating units of 
which 9,284,487,000 kilowatt-hours were delivered to 
Bonneville Power Administration, the marketing 
agency. Traffic through the navigation lock, consisting 
of petroleum products, grains, and miscellaneous cargo. 
Rehabilitation: Refurbishment of two generator 
windings and rebuilding (to strengthen) two turbines 
were completed. A multi-unit generator refurbishment 
contract awarded will enable completion of 75% of all 
turbine generator work included in the rehab program. 
The contract for upgrading the powerhouse control system 
was awarded in 1985, which when complete should 
increase the reliability and ease of operation of the 
powerhouse. 
48. LOOKOUT POINT LAKE, OR 
Location. On Middle Fork, Willamette River at Meridian 
site, 21.3 miles from mouth. Middle Fork, Willamette 
River, rises in Lane County on western slope of 
Cascade Range and flows northwesterly to its junction 
with Coast Fork, which is head of main stem Willamette 
River. Dam is about 22 miles southeast from Eugene, 
OR. 
Existing project. A main dam at Meridian site and a 
reregulating dam 3 miles downstream at Dexter site. 
Both dams are earth-and-gravel-fills with concrete spillways 
and have power generating facilities. Main dam is 
258 feet high from lowest point of the general foundation 
to deck and is 3,381 feet long at crest forming a reservoir 
14.2 miles long providing storage of 456,000 acre-feet at 
full-pool level. Reservoir controls runoff of tributary 
drainage area of 991 square miles. Spillway, 274 feet 
long, is a gate-controlled overflow type, forming right 
abutment. Outlet works consisting of slide-gatecontrolled 
conduits pass through spillway section. Powerhouse 
has three main generating units with a capacity 
of 120,000 kilowatts. Dexter reregulating dam has a 
maximum height of 107 feet above lowest point of the 
general foundation and is 2,765 feet long at crest, forming 
a full pool of 27,500 acre-feet extending upstream to 
main dam and providing pondage to regulate Lookout 
Point powerhouse water releases to a uniform discharge. 
Spillway consists of a gate-controlled overflow section 
509 feet long forming right abutment. 
Flow regulation is accomplished by use of spillway 
gates and releases through powerhouse, which contains 
one 15,000-kilowatt unit. Lookout Point and Dexter 
Lakes are operated as a single unit of a coordinated 
system of reservoirs to protect Willamette River Valley 
against floods, to provide needed hydroelectric power, 
and to increase low water flows for navigation, irrigation, 
and other purposes. Existing project authorized as 
a unit of comprehensive plan for flood control and other 
purposes in Willamette River Basin. 
Construction of project initiated May 1947 was completed 
June 1961, except for construction of additional 
recreation facilities funded through the Code 710 program. 
Future recreation facilities will be provided in 
accordance with the cost-sharing contract with Lane 
County and will require a 50 percent contribution by 
Lane County and is subject to funding availability by 
the Government and the County. At Lookout Point powerhouse, 
generating units 1, 2 and 3 were placed in 
commercial operation December 1954, February 1955, 
and April 1955, respectively. At Dexter powerhouse the 
single unit was placed on-line May 1955. Use of Dexter 
Lake for reregulating fluctuating flows from Lookout 
Point units was effected in December 1954. Through 
September 1987 power generation totaled 13.4 billion 
kilowatt-hours. Of the gross income from sale of this 
power by Bonneville Power Administration, $57,938,549 
was reimbursed to the U.S. Treasury to recover Corps of 
Engineers project investment and operating costs. 
Local cooperation. A multiple project cost sharing 
agreement has been in force with Lane County since 
September 1976. It includes 4 projects and 13 parks. All 
these parks are managed by Lane County under lease 
agreement. Future development will require a supplement 
to the cost sharing agreement. 
Operations during fiscal year. Maintenance: 
Normal operation and maintenance continued. During 
fiscal year 318,402,000 kilowatt-hours of electrical power 
energy were generated at project of which 316,513,000 
kilowatt-hours were delivered to Bonneville Power 
Administration, the marketing agency. Freshets regulated 
by Lookout Point Lake project on Middle Fork 
Willamette River are shown in Table 37-M. 
49. LOST CREEK LAKE, ROGUE 
RIVER BASIN, OR 
Location. On upper Rogue River at mile 153.6 about 
30 miles northeasterly from Medford, OR. 
Existing project. A rock and gravel-fill embankment 
dam about 327 feet high from streambed to crest, 
with an overall length of 3,750 feet with an impervious 
earth core and a gate-controlled concrete spillway. Powerhouse 
is on right abutment and houses two Francistype 
turbines with installed capacity of 24,500 kilowatts 
each. Regulating outlet facility with provisions for 
temperature regulation for releases in interest of fishery 
enhancement is also on right bank. Reservoir 10 miles 
37-20

PORTLAND, OREGON DISTRICT 
long provides 315,000 acre-feet of usable storage. Project 
provides control of runoff of drainage area of 674 square 
miles. In addition to hydroelectric power generation, 
project provides flood control, irrigation, future municipal 
and industrial (M&I) water supply, fish and wildlife 
enhancement, water quality control and recreation 
benefits. 
Construction of project initiated July 1967 is complete. 
Generating units 1 and 2 were placed in commercial 
operation July 6 and July 13, 1977, respectively. Physical 
in-service date for flood control was February 18, 1977. 
Final environmental statement was filed with Council 
on Environmental Quality in June 1972. Through September 
1987 power generation totaled 3.0 billion 
kilowatt-hours. Of the gross income frotn sale of this 
power by Bonneville Power Administration, $15,169,372 
was reimbursed to the U.S. Treasury to recover Corps of 
Engineers project investment and operating costs. 
Local cooperation. Authorizing act required that 
local agencies furnish assurances prior to construction 
that demands will be made for future use of water supply 
storage within a period that will permit repayment of 
costs, including interest, allocated to water supply 
within life of the project; that State of Oregon take 
action, prior to construction to insure maintenance in 
stream of flows to be released for fishery; in addition, 
costs allocated to irrigation would have to be repaid in 
manner and to an extent consistent with reclamation 
laws and policies; and costs allocated to power will be 
repaid on a system basis by revenue from sales of power 
in Pacific Northwest Federal system by Bonneville 
Power Administration. A survey in September, 1980 of 
M&I water supply needs showed nine communities with 
water supply needs. A contract for M&I supply has been 
completed with one of the communities. Assurances for 
municipal and industrial water supply were obtained 
from six communities in Rogue River Valley. On February 
26,1966 Oregon State Department of Fish and Wildlife 
agreed to operate Rogue River hatchery for mitigation 
and enhancement of fish. The Corps provides full 
funding for the operation and maintenance of the 
hatchery. The hatchery became operational in 1972. 
Operations during fiscal year. Maintenance: 
Normal operation and maintenance continued. During 
fiscal year 286,670,000 kilowatt-hours of electrical power 
energy were generated at project of which 284,109,000 
kilowatt-hours were delivered to Bonneville Power 
Administration, the marketing agency. Freshets regulated 
by Lost Creek Lake on Rogue River are shown in 
Table 37-M. 
-50 THE DALLES LOCK AND DAM-LAKE 
CELILO, WA AND OR 
Location. On Columbia River at head of pool behind 
Bonneville Dam, about 192 miles above mouth of river 
and 88 mileseast of Portland, OR. 
Existing project. A dam, powerplant, navigation 
lock, and appurtenant facilities. Improvement provides 
for navigation and hydroelectric power generation. Dam 
is designed for a normal pool at elevation 160 feet at 
mean sea level. Normal pool forms a reservoir extending 
upstream about 23 miles providing slackwater to John 
Day Dam site. The Dalles Dam is 8,700 feet long and 
consists of a rock, gravel, and sand river closure section 
from Oregon shore connecting to a nonoverflow section 
which in turn joins powerhouse, then concrete nonoverflow 
sections connecting spillway with powerhouse and 
spillway with navigation lock at right abutment on 
Washington shore. Fish-passing facilities including two 
ladders and a fish lock are provided. Powerhouse was 
constructed for 14 units initially and substructure for 
eight additional units, an ultimate total of 22 units. 
Initial installation, excluding two 13,500 kilowatt fishwater 
units, is 1,092,000 kilowatts. With eight units 
installed for a capacity of 687,800 kilowatts, the 22 unit 
total is 1,808,800 kilowatts. Structures are founded on 
Columbia River basalt. Principal data concerning lock, 
spillway, and powerhouse are set forth in Table 37-P. 
Major construction of project initiated February 1952, 
was completed October 1960 when unit No. 14 was 
placed in commercial operation. Initial contract for 
additional units 15-22 was awarded in September 1967. 
Additional 8-unit phase was completed when unit 22 
was placed in commercial operation in November 1973. 
Basic recreation facilities were developed with construction 
funds at 4 parks on Lake Celilo. These parks were 
further expanded with code 710 funds in the late 60's and 
early 70's. Two parks are operated by Washington State 
Park Commission under a lease agreement. Studies for 
adding power generation facilities to the North Shore 
Fish Ladder Auxiliary Water Supply System were 
initiated in October 1979 and completed in December 
1980. These facilities would provide baseload generation 
(3.5 megawatts) and would not impact the present operation 
of the North Fish Ladder. However, it was determined 
that it was not within the Chief of Engineers 
authority to add these power facilities. A Local Interest, 
North Wasco County Public Utility District is pursuing 
the construction of these power facilities through the 
FERC license processes. Seufert Visitor Center was 
completed in September 1980. Through September 1987 
power generation totaled 210.8 billion kilowatt-hours. Of 
the gross income from sale of this power by Bonneville 
Power Administration, $262,859,300 was reimbursed to 
the U.S. Treasury to recover Corps of Engineers project 
investment and operating costs. 
Local cooperation. Further recreation development 
will require cost sharing and assumption of operative 
and maintenance by local, non-federal sponsor. 
Operations during fiscal year. Maintenance: Contract 
awarded to upgrade the existing spillway gate position 
indication and control system. Work initiated to 
modify the microwave communication link to the Bonneville 
Power Administration's Big Eddy Substation. 
Rewind of Unit #13 initiated. Normal operation and 
maintenance continued. During fiscal year 
7,627,830,000 kilowatt-hours of electrical power energy 
were generated at project of which 7,609,082,000 
kilowatt-hours were delivered to Bonneville Power 
Administration, the marketing agency. Traffic through 
the navigation lock, consisting of petroleum products, 
grains and miscellaneous cargo. 
General Investigations 
51. SURVEYS 
Fiscal year costs were $1,540,532 of which $294,123 
37-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
was for navigation studies, $502,600 for flood damage 
prevention studies, $396,304 for comprehensive studies, 
$170,024 for miscellaneous activities, and $67,954 for 
coordination with other agencies. 
52. COLLECTION AND STUDY OF 
BASIC DATA 
International water studies. The Columbia River 
Treaty between Canada and the United States of America 
relating to cooperative Development of the Water 
Resources of the Columbia River Basin was signed at 
Washington, D.C., on January 17, 1961, and the 
exchange of ratifications took place on September 16, 
1964. 
Implementations of the Treaty by the United States 
and Canada entities under the guidance of the Permanent 
Engineering Board has continued. The two permanent 
committees established by the entities, the Operating 
Committee and the Hydrometeorological 
Committee, continue to function. 
Costs for support of both committee activities were 
$14,965 for the fiscal year. 
Flood plain management services. Flood Plain 
Management Services Program comes under Section 
206 of the 1960 Flood Control Act, PL 86-645, as 
amended. Through technical services and planning 
guidance, the program encourages comprehensive flood 
plain management planning at all levels to reduce the 
potential for losses to life and property from floods. Federal 
and non-Federal agencies and the private sector are 
assisted with planning and development information 
for flood hazard areas. This assistance is in the form of 
local flood plain regulations, Federal Insurance Program 
requirements, and Executive Order 11988 guidelines. 
Such assistance may include factual flood information 
(available or determined) and interpretation on 
flood frequencies, extent of flooding, flood-water velocity, 
duration of flooding and floodway limits. 
Services accomplished during fiscal year: Technical 
services and planning guidance responses furnished 
totaled 815. Of this total, 73 were from other Federal 
agencies; 263 from non-Federal agencies; and 479 from 
private sector realtors, corporations, lending institutions, 
engineers, architects, and others. Cost for providing 
these services during FY 1987 totaled $106,650. 
Hydrologic studies. Environmental and ecological 
aspects are being considered on all hydrologic studies. 
Improvements in procedures to determine reservoir 
temperatures, nitrogen supersaturation, dissolved oxygen, 
suspended sediment, turbidity, design floods, flood 
forecasting and flood regulation are a continuing program. 
Costs for hydrologic studies during the fiscal year 
were $2,877. 
37-22

PORTLAND, OREGON DISTRICT 
TABLE 37-A COST AND FINANCIAL STATEMENT 
See 
Section Total to 
In Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
Bonneville Navigation 
Lock, Bonneville Dam, 
OR and WA 
Chetco River, OR 
3. Columbia and Lower 
Willamette Rivers 
Below Vancouver, 
WA and Portland, OR 
(Federal Funds) 
(Contributed Funds) 
4. Columbia River at 
Baker Bay, WA 
5. Columbia River 
Between Chinook, 
WA, and Head of 
Sand Island 
6. Columbia River at 
The Mouth, OR 
and WA 
7. Columbia River 
Between Vancouver, 
WA and The Dalles 
OR 
8. Coos Bay, OR 
(Federal Funds) 
(Contributed Funds) 
1. 
2. 
- 130,000 6,451,000 23,299,000 
- - 6,396,070 22,931,894 
361,300 475,000 552,000 300,200 
361,560 472,802 554,702 296,243 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost. 
New Work 
Contrib. 
Cost 
15,213,000 
15,306,888 
11,459,400 
11,430,195 
10,932,230 
10,861,438 
16,500 312,000 438,000 311,000 
29,861 312,160 438,112 252,899 
34,500 
51,058 
7,008,000 
7,003,593 
5,744,000 
5,771,078 
338,000 
321,474 
347,900 
352,944 
7,250,000 
7,243,987 
594,000 501,000 
605,577 505,301 
8,911,415 6,302,400 
8,818,651 6,385,156 
938 - 
188,400 
190,017 
663,000 
652,345 
429,000 441,000 
438,416 428,767 
2,971,940 5,042,000 3,041,000 
2,992,359 4,974,845 3,085,466 
3,933,300 
3,886,842 
29,880,000 
29,327,964 
2,043,7131 
2,043,7131 
5,119,626 
5,114,978 
28,349,3042 
28,349,3042 
247,079,7563 
246,949,6293 
665,9544 
665,9544 
941,252 
941,252 
3,346,185 
3,288,081 
220,2835 
220,2835 
4,144,813 
4,143,434 
24,913,6616 
24,913,6616 
90,593,4997 
90,564,5757 
7,322,878 
7,322,878 
5,989,5098 
5,989,5098 
11,707,9489 
11,694,4279 
29,750,09210 
29,750,09210 
63,157,95211 
63,087,30511 
2,335,966 
2,335,966 
486,680 
486,680 
37-23 
120,815,100 
120,716,288

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 37-A 
(Continued) 
See 
Section 
In Text Project 
9. Coos and Millicoma 
Rivers, OR 
10. Coquille River, OR 
11. Depoe Bay, OR 
13. Nehalem Bay, OR 
14. Port Orford, OR 
16. Rogue River Harbor 
At Gold Beach, OR 
17. Siuslaw River OR 
(Federal Funds) 
(Contributed Funds) 
COST AND FINANCIAL STATEMENT 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major 
Rehab. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Total to 
FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
- - - - 350,23812 
121,900 
135,609 
191,400 
193,508 
89,700 
89,446 
126,000 
134,975 
365,900 
365,818 
387,700 
677,713 
8,000,000 
12,713,495 
719,900 
723,964 
45,000 
- 
49,000 
43,230 
426,000 
418,273 
55,000 
52,512 
170,000 
175,970 
333,000 
341,125 
- 
27,000 
29,397 
51,600 
50,373 
339,000 
336,007 
45,000 
43,260 
5,724 15,777 1,249 
392,000 
389,311 
1,000,000 
985,538 
12,900,000 
12,915,368 
646,000 
641,001 
45,000 
90,000 
208,000 
210,184 
354,000 
368,738 
2,081,000 
1,821,733 
581,000 
584,714 
295,000 
293,510 
917,800 
824,626 
62,000 
315,633 
689,000 
687,256 
350,23812 
1,745,610 
1,743,468 
693,36613 
693,36613 
5,382,94414 
5,379,55714 
367,364 
367,364 
792,876 
790,587 
302,00615 
302,00615 
55,195 
55,195 
12,088,000 
12,088,000 
758,69216 
758,69216 
2,699,329 
2,697,145 
4,156,25217 
4,156,25217 
9,246,52018 
9,151,60018 
635,783 
635,783 
29,527,21219 
29,517,22519 
11,173,09920 
11,169,75320 
879,285 
879,285 
412,532 
412,532 
37-24

PORTLAND, OREGON DISTRICT 
TABLE 37-A 
(Continued) 
See 
Section 
In Text Project 
18. Skipanon Channel, 
OR 
19. Tillamook Bay and 
Bar, OR 
20. Umpqua River, OR 
21. Willamette River at 
Willamette Falls, 
OR 
22. Yaquina Bay and 
Harbor, OR 
23. Applegate Lake, 
Rogue River Basin, 
OR 
COST AND FINANCIAL STATEMENT 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Total to 
FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
80,500 336,000 292,000 294,000 
403,165 334,934 291,905 284,590 
31,000 217,000 59,000 
32,593 205,228 68,044 
9,851 
827,700 
829,517 
528,000 
710,319 
1,493,400 
1,494,202 
30,000 
189,499 
512,000 
650,948 
161 
604,000 
580,834 
501,000 
480,860 
1,131,000 
1,094,881 
31,300 
111,836 
580,000 
590,699 
20,000 
20,691 
956,000 1,723,900 
965,341 1,665,197 
496,000 
510,761 
493,000 
523,138 
9,300 
47,546 
550,000 
556,380 
748,000 
746,399 
1,834,400 
1,817,346 
996 
625,000 
605,461 
280,854 
280,854 
3,123,014 
3,112,410 
22,434,82721 
22,434,82721 
2,937,79022 
2,935,56122 
2,839,799 
2,839,799 
17,718,87723 
17,718,87723 
23,131,889 
23,059,137 
2,500,677 
2,500,677 
520,00524 
520,00524 
14,706,82325 
14,692,38525 
234,794 
234,794 
19,242,04626 
19,242,04626 
20,509,70227 
20,485,15727 
12,005 
12,005 
91,642,489 
91,624,484 
3,381,70050 
3,359,76250 
37-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 37-A 
(Continued) 
COST AND FINANCIAL STATEMENT 
See 
Section 
In Text Project 
24. Blue River Lake, OR 
25. Cottage Grove Lake, 
OR 
26. Deschutes River 
Bend, OR 
27. Dorena Lake, OR 
28. Elk Creek Lake, 
Rogue River Basin, 
OR 
29. Fall Creek Lake, OR 
30. Fern Ridge Lake, OR 
35. Lower Columbia 
River Basin Bank 
Protection, OR & WA 
36. Mt. St. Helens and 
Vicinity, WA 
37. Mt. St. Helens 
Sediment Control, 
Castle Rock, WA 
40. Willamette River 
Basin Bank Protection, 
OR 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Total to 
FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
180,000 
184,659 
673,000 
655,509 
1,200 
1,600 
342,000 
342,563 
3,500 
8,100 
270,000 
269,304 
77 
937,000 
958,097 
2,600,000 
2,458,996 
10,345,000 
18,267,493 
624,500 
636,359 
56,600 
62,436 
151,000 
147,919 
623,000 
605,928 
57,500 
28,405 
352,000 
328,889 
10,000,000 
4,773,965 
235,000 
232,116 
7 
1,C 
1,1 
6,1 
6,2 
213,000 
219,165 
284,000 
267,968 
- - 
708,000 896,000 
730,380 854,918 
- 17,000 
25,848 20,230 
382,000 
405,563 
32,226,000 
20,345,020 
255,000 
258,853 
- - 
742,000 847,000 
745,135 856,543 
)00,000 2,850,000 
149,563 2,840,161 
133,000 6,280,000 
!32,116 6,347,141 
- 1,400,000 
- 1,365,665 
744,000 343,000 
760,094 300,794 
178,000 96,000 
179,056 95,917 
619,000 
544,805 
9,100,000 
26,012,598 
341,000 
337,548 
2,332,000 
2,289,234 
216,000 
224,638 
3,740,000 
3,647,394 
29,265,000 
28,825,326 
389,000 
458,945 
70,200 
60,544 
32,038,22528 
32,038,22528 
2,197,991 
2,180,502 
4,013,12329 
4,013,12329 
8,874,67830 
8,816,67230 
74,500 
74,483 
14,568,26231 
14,568,26231 
5,039,174 
4,962,339 
63,192,579 
62,961,093 
22,118,26432 
22,118,26432 
4,387,415 
4,382,807 
8,526,93533 
8,526,93533 
12,496,63434 
12,449,39234 
20,790,745 
20,786,587 
42,228,000 
42,051,512 
30,665,000 
30,190,991 
24,697,81635 
24,690,31435 
3,611,744 
3,601,531 
37-26 
I
J

TABLE 37-A 
(Continued) 
See 
Section 
In Text Project 
41. Willow Creek Lake, OR 
42. Bonneville Lock and 
Dam-Lake Bonneville, 
OR and WA 
43. Cougar Lake, OR 
44. Detroit Lake, OR 
45. Green Peter-Foster 
Lakes, OR 
46. Hills Creek Lake, OR 
47. John Day Lock and 
Dam-Lake Umatilla, 
OR and WA 
48. Lookout Point 
Lake, OR 
PORTLAND, OREGON DISTRICT 
COST AND FINANCIAL STATEMENT 
Funding 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Total to 
FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
(See Walla Walla, WA District) 
86,000 
83,904 
12,200,000 
12,032,268 
8,820,000 
8,478,177 
6,241 
860,000 
861,133 
1,789,000 
1,757,050 
1,694,000 
1,679,567 
591,000 
641,968 
10,624,000 
9,103,019 
9,746,000 
9,956,705 
498,000 
467,009 
17,530,000 
17,905,137 
10,468,000 
10,848,327 
492 
731,000 
733,379 
1,411,000 
1,426,060 
1,810,000 
1,825,339 
457,000 
442,717 
6,483,000 
8,046,653 
10,633,000 
10,663,086 
382,000 
405,626 
14,826,000 
14,958,973 
12,994,000 
12,979,585 
34 
1,141,000 
1,153,266 
1,456,000 
1,435,467 
1,688,000 
1,667,370 
446,000 
457,531 
8,685,000 
8,665,982 
6,125,000 
6,257,535 
403,000 
399,378 
6,850,000 
5,472,560 
11,512,000 
11,118,185 
1,260,000 
1,245,605 
1,557,000 
1,554,727 
1,925,000 
1,887,327 
658,000 
643,258 
1,930,000 
1,941,379 
8,103,000 
8,037,902 
1,369,000 
1,355,917 
760,146,60436 
758,682,27936 
141,782,10137 
141,119,87737 
58,636,39338 
58,636,39338 
10,790,81651 
10,774,90251 
62,729,698 
62,729,698 
25,417,77249 
25,374,84649 
363,086 
363,086 
84,005,78839 
84,005,78839 
21,978,13240 
21,912,24440 
45,700,619 
45,700,619 
7,677,26741 
7,659,13041 
511,866,24642 
511,780,81142 
98,477,15943 
98,263,67543 
138,000 4,450,000 3,800,000 15,543,000 
18,669 167,842 4,418,339 3,766,284 15,473,917 
S- - - 88,238,39544 
S- - - 88,238,39544 
2,348,000 2,119,000 2,194,000 2,520,000 36,434,60545 
2,332,882 2,138,429 2,156,310 2,461,925 36,296,57645 
37-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 37-A 
(Continued) 
COST AND FINANCIAL STATEMENT 
Funding FY 84 FY 85 FY 86 FY 87 
Total to 
Sep. 30, 1987 
49. Lost Creek Lake, 
Rogue River 
Basin, OR 
50. The Dalles Lock and 
Dam-Lake Celilo, 
WA and OR 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
- 290,000 
235,687 271,310 
4,700 
7,270 
2,105,000 2,600,000 2,420,000 2,636 
2,100,169 2,522,379 2,466,125 2,627 
6,201,000 7,606,000 8,927,000 7,095,000 
5,840,781 7,851,423 9,027,285 6,866,803 
- 136,408,150 
132 136,391,810 
,000 19,499,80046 
,487 19,437,03746 
301,064,28847 
301,064,28847 
90,065,00848 
89,742,25448 
1Excludes $17,742 contributed funds for new work. 
2Includes $1,529,413 for previous project. 
3Includes $150,955 allotted from deferred maintenance 
funds, Code 700, $62,296 for public works accelerated program 
repair, and $1,214,865 for previous project. Excludes $24,320 
expended from contributed funds prior to 1964. 
4Excludes $31,636 contributed by city of Astoria and 
Bumble Bee Sea Foods, Astoria OR (not part of regular project). 
Includes $223,026 expended from contributed funds prior 
to 1964 and $428,136 contributed by Port of Portland and 
$14,792 by Port of Vancouver. 
5Includes $84,930 rehabilitation funds. 
6Includes $1,986,253 for previous project and $608,111 
allotted and expended under Code 710, recreation facilities at 
completed project. Excludes $500,000 contributed funds. 
7Includes $2,186,000 for previous project and $1,188,625 
under deferred maintenance, Code 700. 
sIncludes funds under Code 721 (small authorized projects) 
$30,393. Entrance to Oregon Slough; $161,897, Camas- 
Washougal Turning Basin; $227,908, Hood River Small Boat 
Basin; $157 470, Bingen, WA, Barge Channel; and $140,619, 
The Dalles Small Boat Basin. 
9Includes $2,033,408 under Code 700 (Deferred 
Maintenance). 
10Includes $802,096 for previous project. Excludes contributed 
funds. 
11Includes $178,801 for previous project and $1,444,640 
under Code 700, Deferred Maintenance. Excludes $8,387 contributed 
funds. 12Excludes $80,000 (other funds) contributed for new work 
by Port of Coos Bay to cover additional cost of disposing of 
dredge spoils in Coos Bay, OR; includes $8,000 for previous 
project. 
13Includes $340,726 for previous project. Excludes $72,891 
contributed funds. Includes $36,000 under Code 711. 
14Includes $41,467 for previous project and $78,500 under 
Code 700, Deferred Maintenance. 15Excludes $304,826 contributed funds. 
16Excludes $9,900 contributed funds. 
17Excludes $13,779 (other funds) contributed for additional 
landfill and extension of drainage lines. 
18Includes 21,000, Wedderburn Study Funds. 
19Includes $1,159,357 for previous project. 20Includes $10,611 for previous project and $188,000 under 
Code 700, Deferred Maintenance. 
2 1Includes $77,209 for previous project and $57,767 under 
Code 720 (Small Authorized Projects) Garibaldi Boat Basin. 
Excludes $592,622 contributed funds and $300,000 channel 
dredging by local interest. 
22Includes $71,498 for previous project. Excludes $6,450 
expended from contributed funds. 
23Includes $39,242 for previous project. Excludes $6,450 
expended from contributed funds. 
24Excludes $300,000 contributed funds. 
25Includes $452,110 on operation and care from permanent 
indefinite appropriation and $150,000 under maintenance 
and operation of dams and other improvements of navigable 
waters. 
26Includes $707,313 for previous project and $170,000 
appropriated from public works acceleration program for 
north jetty rehabilitation. 
27Includes $6,026 for previous project. 
28Includes $96,000 pro rata share of site selection costs in 
lieu of Quartz Creek Lake. 
29Includes $1,639,828 allotted and expended under Code 
710, recreation facilities at completed project. 
30Includes $167,878 special recreation use fees. Includes 
$66,678 under maintenance and operation of dams and other 
improvements to navigable waters. 
31Includes $1,038,790 allotted and expended under Code 
710, recreation facilities at completed project. 
32Includes $1,026,264 allotted and expended under Code 
710, recreation facilities at completed projects. 
33Includes $3,894,673 allotted and expended under Code 
710, recreation facilities at completed projects and $136,482 
allotted under 721 (small authorized project) reservoir modification. 
Excludes $2,100 (other funds contributed). 
34Includes $9,750 allotted under Code 700, deferred maintenance. 
Includes $66,678 under maintenance and operation of 
dams and other improvements to navigable waters. 
35Excludes $93,733 contributed funds. 
36Includes $12,200,000 Public Works Administration 
funds, $20,240,700 National Recovery Act funds, $27,195,400 
modification for peaking funds, $136,457 Code 710, recreation 
facilities at completed project funds and $627,593,352 allotted 
and $642,332,501 expended second powerhouse funds, $6,000 
allotted $6,000 expended, power units funds. 
37Includes $540,000 deferred maintenance funds, Code 700 
and $1,692,148 maintenance and operation of dams and other 
improvements of navigable waters. 
37-28 
See 
Section 
In Text 
In Text Project 
Project

PORTLAND, OREGON DISTRICT 
TABLE 37-A 
(Continued) 
COST AND FINANCIAL STATEMENT 
38Includes $96,000 pro rata share of site selection in lieu of 
Quartz Creek Lake. Includes $1,789,988 allotted and $1,789,954 
expended for Strube Lake and Cougar Additional Unit. 
39Includes $113,000 pro rata share of site selection costs in 
lieu of Sweet Home Lake. 
40Includes $198,578 under maintenance and operation of 
dams and other improvements of navigable waters. 
41Includes $75,400 under maintenance and operation of 
dams and other improvements of navigable waters. 
42Includes $25,984 allotted and expended under Code 710, 
recreation facilities at completed projects. 
43Includes $1,361,900 for O&M and fish evaluation of 
Spring Creek Hatchery (funds revoked and paid to USFWS at 
OCE level, but a cost to project); includes $423,800 special 
recreation use fees. Includes $933,438 allotted under maintenance 
and operation of dams and other improvements of 
navigable waters. 
44Includes $457,611 allotted and expended under Code 710, 
recreation facilities at completed project. 
45Includes $198,578 under maintenance and operation of 
dams and other improvements to navigable waters. 46Includes $198,578 under maintenance and operation of 
dams and other improvements to navigable waters. 
47Includes $1,140,747 allotted and expended under Code 
710, recreation facilities at completed project, and $52,997,220 
allotted and expended additional units 15-22 funds. 48Includes $721,490 under maintenance and operation of 
dams and other improvements of navigable waters. 
49Includes $142,078 under maintenance and operation of 
dams and other improvements to navigable waters. 
50lncludes $66,678 under maintenance and operation of 
dams and other improvements to navigable waters. 
51Includes $66,678 under maintenance and operation of 
dams and other improvements to navigable waters. 52Includes $14,959,000 under Code 310, Inland Waterway 
Trust Fund. 
53Includes $14,570,957 under Code 310, Inland Waterway 
Trust Fund. 
37-29 
__

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 37-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act& 
1. 
Aug. 15, 1985 
Nov. 17, 1986 
Mar. 2, 1945 
Oct. 27, 1965 
Dec. 4, 1981 
3. 
Feb. 27, 1911 
July 25, 1912 
July 27, 1916 
Aug. 8, 1917 
Sep. 22, 1922 
Mar. 4, 19232 
Mar. 3, 1925 
Mar. 3, 1927 
July 3, 1930 
Sep. 6, 19333 
Aug. 30, 1935 
Aug. 30, 1935 
Aug. 30, 1935 
Aug. 26, 1937 
Aug. 26, 1937 
Mar. 2, 1945 
Project and Work Authorized 
BONNEVILLE NAVIGATION LOCK, 
BONNEVILLE DAM, OR AND WA 
Construction of a new navigation lock just south 
of existing lock. 
Construction to be funded 50% from fuel taxes paid 
into Inland Waterways Trust Fund. 
CHETCO RIVER, OR 
To provide for the stabilization of the channel, 
by constructing jetties and dredging. 
Modification of channel entrance and channel 
improvements. 
Deepen channel 2 feet to 16 feet, extend the existing 
jetty system 750 feet for the North, and 1,250 feet 
for the South jetty. 
COLUMBIA AND LOWER WILLAMETTE 
RIVERS BELOW VANCOUVER, WA AND 
PORTLAND, OR 
2 pipeline dredges and accessories. 
Increasing main channel to 30 feet. 
Consolidating improvement below Portland, OR and 
between Vancouver, WA and mouth of Willamette. 
For the Cathlamet channel. 
Construct an additional dredge (dredge was not 
built) and accessories for better maintenance, and 
construct contraction works. 
Channel from deep water in Willamette Slough to 
deep water in Columbia River. 
Depth of 25 feet and width of 300 feet from mouth of 
Willamette River to Vancouver, Wa. 
Closing east channel at Swan Island in Willamette 
River on condition that main channel to be opened 
to project dimensions on west side of island by Port 
of Portland. 
For a 35-foot channel 500 feet wide from Portland to 
the sea. 
A channel 28 feet deep and 300 feet wide from mouth 
of Willamette River to Vancouver, with 2 turning 
basins, each generally 28 feet deep by 800 feet wide 
by 2,000 feet long. 
A channel in Columbia River from mouth of Willamette 
to interstate highway bridge at Vancouver, 
WA, 30 feet deep and 300 feet wide, with 2 turning 
basins at Vancouver. 
Maintenance of not to exceed 35 foot depth at low 
water in Portland Harbor and Willamette River between 
its mouth and Broadway Bridge at Portland. 
Auxiliary channels, 30 feet deep, 300 feet and 500 
feet at St. Helens. 
Extension of lower turning basin at Vancouver, WA, 
1,000 feet downstream. 
An auxiliary channel 24 feet deep and 200 feet wide 
along waterfront at Rainier, OR. 
Improvement of old mouth of Cowlitz River. 
Documents 
P.L. 99-88 
P.L. 99-662 
H. Doc. 817, 77th Cong., 
2d Sess. 
S. Doc. 21, 89th Cong., 
1st Sess. 
S. Doc. 10, 96th Cong., 
1st Sess. 
H. Doc. 1278, 61st Cong., 
3d Sess.1 
H. Doc. 1278, 61st Cong., 
3d Sess.1 
No Prior Report. 
H. Doc. 120, 63d Cong., 
1st Sess.1 
H. Doc. 1009, 66th Cong., 
3d Sess. 
H. Doc. 156, 67th Cong., 
2d Sess. 
H. Doc. 126, 68th Cong., 
1st Sess. 
Rivers and Harbors 
Committee Doc. 10 
69th Cong., 2d Sess. 
H. Doc. 195, 70th Cong., 
1st Sess. and Rivers 
and Harbors Committee 
Doc. 8, 71st Cong., 
1st Sess.' 
H. Doc. 249, 72d Cong., 
2d Sess.' 
Rivers and Harbors 
Committee Doc. 1, 
74th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 6 
73d Cong., 1st Sess.' 
H. Doc. 235, 72d Cong., 
1st Sess.' 
Rivers and Harbors 
Committee Doc. 81, 
74th Cong., 2d Sess. 1 
H. Doc. 203, 75th Cong., 
1st Sess.' 
H. Doc. 341, 77th Cong., 
1st. Sess.' 
37-30

37-B 
Led) 
TABLE 
(Continu 
See 
Section 
in Text 
Oct. 23, 1962 
Dec. 11, 1933 
Aug. 30, 1935 
Mar. 2, 1945 
May 17, 1950 
June 20, 1938 
Sep. 3, 1954 
Mar. 3, 1905 
Dec. 22, 1944 
as amended 
Sep. 3, 1954 
July 30, 1983 
Aug. 26, 1937 
Mar. 2, 1945 
July 24, 1946 
July 24, 1946 
July 24, 1946 
July 24, 1946 
PORTLAND, OREGON DISTRICT 
AUTHORIZING LEGISLATION 
Date 
Authorizing 
Act 
Mar. 2, 1945 
July 24, 1946 
Oct. 23, 1962 
COLUMBIA RIVER AT THE MOUTH, 
OR AND WA 
Extend South Jetty and construct North Jetty and 
dredging. 
Construction, operation, and maintenance of recreation 
facilities. 
Bar channel of 48-foot depth and spur jetty on north 
shore.9 
Deepening the northernmost 2,000 feet of the channel 
cross section to 55 feet. 
COLUMBIA RIVER BETWEEN 
VANCOUVER, WA, AND THE DALLES, OR 
Construct a channel 27 feet deep by 300 feet from 
Vancouver, WA, to Bonneville, OR. 
Construct Camas-Washougal turning basin. 
Construct a channel 27 feet deep by 300 feet wide 
from Bonneville, OR, to The Dalles, OR. 
Construct a boat basin at Hood River, OR, 10 feet 
deep, 500 feet wide, by 1,300 feet long. 
Construct a barge channel at Bingen, WA, 10 feet 
deep, 200 feet wide, by 1 mile long, and an access 
channel 7 feet deep, 100 feet wide, by 1,000 feet long 
to natural mooring basin. 
Construct The Dalles Harbor 8 feet deep, 400 feet 
wide by 800 feet long. 
H. Doc. 94, 56th Cong., 
1st Sess. 
Sec. 4, Flood Control 
Act of 1944 
H. Doc. 249, 83d Cong., 
2d Sess.1 
P.L. 98-63 
H. Committee Doc. 94, 
74th Cong., 2d Sess.1 
H. Doc. 218, 76th Cong., 
1st Sess. 
H. Doc. 704, 79th Cong., 
2d Sess. 
H. Doc. 704, 79th Cong., 
2d Sess. 
H. Doc. 704, 79th Cong., 
S. Doc. 89, 79th Cong., 
1st Sess.1 
37-31 
6. 
7. 
Project and Work Authorized 
An auxiliary channel in vicinity of Longview, WA. 
A small-boat mooring basin at Astoria, OR. 
A channel 35 feet deep and 500 feet wide from mouth 
of Willamette River to interstate highway bridge at 
Vancouver, WA, with 2 turning basins of same 
depth. 
A channel 40 feet deep and 600 feet wide from Vancouver, 
WA, to mouth of Columbia River; a turning 
basin at Vancouver, WA, a turning basin at Longview, 
WA, and a channel 40 feet deep in Willamette 
River from mouth to Broadway Bridge which 
encompasses Portland Harbor area. 
COLUMBIA RIVER AT BAKER BAY, WA 
East channel. 
Main channel. 
West channel 8 feet deep. 
West channel 10 feet deep and mooring basin with 
protecting breakwaters. 
COLUMBIA RIVER BETWEEN CHINOOK, WA 
AND HEAD OF SAND ISLAND 
Channel 8 feet deep. 
Channel 10 feet deep and mooring basin. 
Documents 
H. Doc. 630, 77th Cong., 
2d Sess.1 
H. Doc. 692, 79th Cong., 
2d Sess.' 
H. Doc. 203, 87th Cong., 
1st Sess. 
H. Doc. 452, 87th Cong., 
2d Sess.' 
Public Works 
Administration 
H. Doc. 44, 73d Cong., 
1st Sess. 
H. Doc. 443, 76th Cong., 
1st Sess. 
S. Doc. 95, 81st Cong., 
1st Sess. 
Rivers and Harbors 
Committee Doc. 50, 
75th Cong., 2d Sess. 
S. Doc. 8, 83d Cong., 
1st Sess.1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 37-B 
(Continued) 
AUTHORIZING LEGISLATION 
Date 
Authorizing 
Act 
June 25, 1910 
Mar. 2, 1919 
Sep. 22, 1922 
Jan. 21, 1927 
July 3, 1930 
Aug. 30, 1935 
July 24, 1946 
June 30, 1948 
Dec. 31, 1970 
June 3, 1896 
June 30, 1948 
June 25, 1910 
Mar. 2, 1919 
July 3, 1930 
Aug. 30, 1935 
Dec. 22, 1944 
as amended 
Mar. 2, 1945 
Aug. 26, 1937 
Mar. 2, 1945 
Project and Work Authorized 
8. 
See 
Section 
in Text 
37-32 
COOS BAY, OR 
Dredging the Ocean Bar Channel. 
A channel 22 feet deep to Smith's Mill. 
Restore North Jetty 9,600 feet long, construct a 
South Jetty about 3,900 feet long, extend 22-foot 
bay channel from Smith's Mill to Millington. 
Extend jetties to such lengths as may be practicable 
within estimate of total cost of jetties, $3,250,000 
given in H. Doc. 150, 67th Cong. 
A channel 24 feet deep and 300 feet wide, through 
Pigeon Point Reef, following a location along 
westerly side of bay. 
For 24-foot channel from Pigeon Point Reef to 
Smith's Mill and a turning basin above Marshfield. 
Increased dimensions of channel across bar and to 
Isthmus Slough and turning basin opposite Coalbank 
Slough and at city of North Bend; anchorage 
basins at mile 3.5 and near mile 7. 
A mooring basin and connecting channel at 
Charleston. 
Increase dimensions to provide for bar channel 45 
feet deep, inner channel 35 feet deep to mile 15, 
and deepening and widening existing turning 
basins and anchorage area. 
COOS AND MILLICOMA RIVERS, OR 
Dredging channel from mouth to head of navigation. 
For a 5 ft. depth from mouth to head of navigation 
on the Millicoma River and South Fork. Except on 
South Fork above M. 14 where 3 ft. will suffice. 
COQUILLE RIVER, OR 
Dredging shoals between mouth and Riverton and 
removing obstruction between mouth of North Fork 
and Bandon. 
For a 13-foot channel from ocean to Bandon. 
Deepen channel to 16 feet between sea and eastern 
end of North Jetty. 
Present project depth between sea and eastern end of 
North Jetty. 
Construction, operation, and maintenance of 
recreation facilities. 
For 13-foot depth from sea to a point 1 mile above 
Coquille River Lighthouse and snagging to State 
Highway Bridge. 
DEPOE BAY, OR 
Construction of inner basin 375 feet long, 125 feet 
wide and 5 feet deep, with entrance channel of same 
depth and 50 feet wide. 
Construction of inner basin 750 feet long, 390 feet 
wide and 8 feet deep, with entrance channel at same 
depth and 30 feet wide. 
_ _ 
9. 
10. 
11. 
I _ 
I _ _I_I__ _ _ Documents 
H. Doc. 958, 60th Cong., 
1st Sess. 
H. Doc. 325, 65th Cong., 
1st Sess. 
H. Doc. 150, 67th Cong., 
2d Sess. 
H. Doc. 320, 69th Cong., 
1st Sess. 
H. Doc. 110, 70th Cong., 
1st Sess.1 
S. Committee Print, 
73d Cong., 2d Sess.' 
S. Doc. 253, 79th Cong., 
2d Sess. 
H. Doc. 646, 80th Cong., 
2nd Sess. 
H. Doc. 151, 91st Cong., 
2d Sess. 
H. Doc. 237, 53d Cong., 
3d Sess. 
S. Doc. 124, 80th Cong., 
2d Sess. 
H. Doc. 673, 61st Cong., 
2d Sess. 
H. Doc. 207, 65th Cong., 
1st Sess.' 
H. Doc. 186, 70th Cong., 
1st Sess. 
S. Committee Print, 
74th Cong. 1st Sess. 
Sec. 4, Flood Control 
Act of 1944 
H. Doc. 672, 76th Cong., 
2d Sess.' 
H. Doc. 202, 75th Cong., 
1st Sess. 
H. Doc. 350, 77th Cong., 
1st sess.

TABLE 37-B 
(Continued) 
PORTLAND, OREGON DISTRICT 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
13. NEHALEM BAY, OR 
14. 
July 25, 1912 Two rubble-stone jetties. 
Oct. 27, 1965 
Dec. 31, 1970 
Sep. 3, 1954 
Sep. 19, 1890 
June 25, 1910 
Mar. 3, 1925 
July 3, 1958 
Oct. 22, 1976 
Oct. 1, 1980 
July 3, 1930 
Aug. 26, 1937 
June 30, 1948 
July 26, 1912 
Mar. 4, 1913 
Mar. 2, 1919 
Mar. 3, 1925 
Mar. 2, 1945 
June 30, 1948 
Sep. 3, 1954 
Oct. 27, 1965 
PORT ORFORD, OR 
Extension of existing breakwater by 550 feet. 
Dredging of turning basin 340 feet long, 100 feet 
wide, 16 feet deep. 
ROGUE RIVER HARBOR AT GOLD 
BEACH, OR 
Two jetties at entrance and improvement of channel. 
SIUSLAW RIVER, OR 
Build two high-tide stone jetties. 
Extends North Jetty 3,700 feet from old work constructed 
under previous project and provides for 
4,200 foot South Jetty. 
12-foot deep channel. 
18-foot bar channel and 16-foot river channel and a 
600-foot extension of North Jetty. (600-foot 
extension classified deferred.) 
Phase I advance engineering and design for north 
and south jetty extensions. 
Extending north and south jetties about 2,000 and 
2,500 feet, respectively. 
SKIPANON CHANNEL, OR 
Channel from deep water in Columbia River to railroad 
bridge, 30 feet deep. 
Channel extending upstream from railroad bridge a 
distance of 4,500 feet. 
Mooring basin 12 feet deep at Warrenton. 
TILLAMOOK BAY AND BAR, OR 
Construct North Jetty 5,700 feet long and dredging 
channel 16 feet deep, 200 feet wide, to Bay City. 
Abandon that portion of project above Bay City. 
Abandon Bay City Channel and present project 
dimension of channels and turning basins with 
tegulating works as needed.4 
Repair damage and check erosion on Bayocean 
Peninsula caused by storm Jan. 1939. 
Dredging small-boat basin and approach at 
Garbaldi OR, to depth of 12 feet. 
Closure of breach in Bayocean Peninsula. 
Construct South Jetty, 80,000 feet long. 
37-33 
II. Doc. 623, 62d Cong., 
2d Sess. 
S. Doc. 62, 88th Cong., 
2d Sess. 
H. Doc. 151, 91st Cong., 
2d Sess. 
S. Doc. 83, 83d Cong. 
2d Sess. 
H. Doc. 71, 51st 
Cong., 1st Sess. 
H. Doc. 648, 61st Cong., 
2d Sess. 
S. Committee Print, 
Serial, 68th Cong., 
1st Sess. 
H. Doc. 204, 85th Cong., 
1st Sess.1 
Final Report of Chief 
of Engineers 
P.L. 96-367 
H. Doc. 278, 70th Cong., 
1st Sess.1 
H. Doc. 201, 75th Cong., 
1st Sess.' 
S. Doc. 93, 80th Cong., 
1st Sess. 
H. Doc 349, 62d Cong., 
2d Sess. 
H. Doc. 760, 65th Cong., 
2d Sess. 
H. Doc. 562, 68th Cong., 
2d Sess. 
S. Doc. 35, 79th Cong., 
1st Sess. 
H. Doc. 650, 80th Cong., 
1st Sess. 
S. Doc. 128, 83d Cong., 
2d Sess.' 
S. Doc. 43, 89th Cong., 
1st Sess.' 
16. 
17. 
18. 
19.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 37-B 
(Continued) 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Sep. 22, 1922 
Jan. 21, 1927 
July 3, 1930 
Aug. 30, 1935 
June 20, 1938 
Mar. 2, 1945 
Mar. 2, 1945 
June 30, 1948 
Sep. 3, 1954 
June 25, 1910 
Aug. 8, 1917 
June 26, 19346 
Mar. 2, 1945 
Mar. 2, 1919 
Aug. 26, 1937 
Mar. 2, 1945 
July 24, 1946 
July 3, 1958 
July 14, 1960 
20. UMPQUA RIVER, OR 
North Jetty, 7,500 feet long. 
Present project dimensions of North Jetty and 
dredging ocean bar. 
A short south jetty. 
A full length south jetty and maintenance dredging 
to a 26-foot depth. 
Channel 22 feet deep and 200 feet wide from mouth 
to Reedsport. 
Channel 22 feet deep and 200 feet wide from river 
channel to Gardiner, and turning basin 22 feet 
deep, 500 feet wide and 800 feet long. 
Channel 10 feet deep and 100 feet wide from river 
channel to dock in Winchester Bay with mooring 
and turning basin 10 feet deep, 175 feet wide, and 
300 feet long at inner end. 
Channel 12 feet deep and 100 feet wide from river 
channel to dock in Winchester Bay with mooring 
and turning basin 12 feet deep, 175 feet wide, and 
300 feet long at inner end. 
Channel 12 feet deep, Scholfield River.5 
WILLAMETTE RIVER AT WILLAMETTE 
FALLS, OR 
For purchase and rehabilitation of system and 
construction of concrete division wall. 
Deepening of locks. 
Operation and care of canal and locks provided 
for with funds from War Department appropriations 
for Rivers and Harbors. 
Construction of New Willamette Falls Locks.8 
YAQUINA BAY AND HARBOR, OR 
Restoration and extension of jetties constructed under 
previous projects, rock removal at entrance and 
dredging in bay up to railroad terminus at Yaquina. 
Extension of north jetty seaward 1,000 feet. 
26-foot channel of suitable width across entrance bar, 
as far as rock bottom will allow, a 20-foot channel 
300 feet wide along south side of bay to and including 
a turning basin 22 feet deep, 1,000 feet wide and 1,200 
feet long. 
Construct a small-boat mooring basin at Newport, OR. 
40-foot bar channel and 30-foot river channel 
extension of jetties at entrance. 
A small boat basin, south shore. 
37-34 
H. Doc. 913, 65th Cong., 
2d Sess. 
H. Doc. 320, 69th Cong., 
1st Sess. 
H. Doc. 317, 70th Cong., 
1st Sess.1 
Rivers and Harbors 
Committee Doc. 9 
72d Cong., 1st Sess. 1 
S. Doc. 158, 75th Cong., 
3d Sess.1 
S. Doc. 86, 76th Cong., 
1st Sess.1 
S. Doc. 191, 77th Cong., 
2d Sess. 
S. Doc. 154, 80th Cong., 
2d Sess.' 
S. Doc. 133, 81st Cong., 
2d Sess.' 
H. Doc. 202, 56th Cong., 
1st Sess. and Annual 
Report, 1900, P. 4374 
H. Doc. 1060, 62d Cong., 
3d Sess.1 
H. Doc. 544, 75th Cong., 
3d Sess. 
H. Doc. 109, 65th Cong., 
1st Sess. 
S. Committee Print, 
75th Cong., 1st Sess. 
S. Doc. 119, 77th Cong., 
1st Sess. 
S. Doc. 246, 79th Cong., 
2d Sess. 
S. Doc. 8, 85th Cong., 
1st Sess.' 
Section 107, P.L. 86-645 
Authorized by Chief of 
Engineers, Mar. 4, 1977 
21. 
22.

TABLE 37-B 
(Continued) 
See 
Section Au 
in Text 
PORTLAND, OREGON DISTRICT 
AUTHORIZING LEGISLATION 
Date 
thorizing 
Act 
23. 
24. 
25. 
26. 
27. 
Oct. 23, 1962 
Mar. 7, 1974 
May 17, 1950 
Nov. 17, 1986 
June 28, 1938 
Dec. 22, 1944 
as amended 
June 28, 1948 
June 28, 1938 
Dec. 22, 1944 
as amended 
Oct. 23, 1962 
Oct. 7, 1970 
May 17, 1950 
Dec. 22, 1944 
as amended 
June 28, 1938 
Dec. 22, 1944 
as amended 
Oct. 23, 1962 
May 17, 1950 
28. 
29. 
30. 
34. 
35. 
May 17, 1950 
Project and Work Authorized 
APPLEGATE LAKE, ROGUE RIVER 
BASIN, OR 
Authorizes a rockfill embankment dam. 
Authorizes construction of project but no operation for 
irrigation until local interests agree to repay cost 
allocated. 
BLUE RIVER LAKE, OR 
Authorizes gravel-filled embankment dam. 
Authorizes Construction of hydroelectric power 
facilities 
COYITAGE GROVE LAKE, OR 
Earthfill dam. 
Construction, operation, and maintenance of recreation 
facilities. 
DESCHUTES RIVER, BEND, OR 
Construction of an ice boom. 
DORENA LAKE, OR 
Earthfill dam. 
Construction, operation, and maintenance of recreation 
facilities. 
ELK CREEK LAKE, ROGUE RIVER BASIN, OR 
Roller compacted concrete dam. 
Authorizes construction but not operation for irrigation 
until local interests agree to repay cost allocated. 
FALL CREEK LAKE, OR 
Earth and gravel fill embankment dam. 
Construction, operation, and maintenance of recreation 
facilities. 
FERN RIDGE LAKE OR 
Earthfill embankment dam. 
Construction, operation, and maintenance of recreation 
facilities. 
Raise height of dam to obtain additional storage. 
LOWER COLUMBIA RIVER BASIN, OR 
AND WA 
Bank protection work, improvements to existing 
projects and construction of flood control works in 
Lower Columbia River Basin. 
LOWER COLUMBIA RIVER BASIN BANK 
PROTECTION, OR AND WA 
Provides bank protection on Columbia River below 
river mile 125 and along principal tributaries. 
Documents 
H. Doc. 566, 87th Cong., 
2d Sess. 
P.L. 93-251 
H. Doc. 531, 81st Cong., 
2d Sess. 
P.L. 99-662 
H. Doc. 544, 75th Cong., 
3d Sess. 
Sec. 4, Flood Control 
Act of 1944 
Section 205 P.L. 80-858 
as amended. 
Auth. by COE May 12, 1987 
H. Doc. 544, 75th Cong., 
3d Sess. 
Sec. 4, Flood Control 
Act of 1944 
H. Doc. 566, 87th Cong., 
2d Sess. 
P.L. 91-439 
H. Doc. 531, 81st Cong., 
2d Sess. 
Sec. 4, Flood Control 
Act of 1944 
H. Doc. 544, 75th Cong., 
3d Sess. 
Sec. 4, Flood Control 
Act of 1944 
H. Doc. 403, 87th Cong., 
2d Sess. 
H. Doc. 531, 81st Cong., 
2d Sess. 
H. Doc. 531, 81st Cong., 
2d Sess. 
37-35 
_ __ _ I_ _ _ _ I~ _ _ _ II_

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 37-B 
(Continued) 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
July 30, 1983 
Aug. 15, 1985 
June 28, 1938 
May 17, 1950 
June 22, 1936 
June 28, 1938 
May 17, 1950 
Oct. 27, 1965 
Aug. 30, 1935 
Aug. 20, 1937 
Dec. 22, 1944 
as amended 
Mar. 7, 1974 
Aug. 22, 1984 
May 17, 1950 
Sep. 3, 1954 
Oct. 23, 1962 
June 28, 1938 
June 30, 1948 
36. 
P.L. 98-63 
P.L. 99-88 
MT. ST. HELENS AND VICINITY, WA. 
Implement and maintain flood control measures 
on the Cowlitz and Toutle Rivers to assure flood 
protection for developed areas in the vicinity of such 
rivers against a one-hundred-year flood and to 
reduce sedimentation flow and the chance of blockage 
on the Columbia River. 
MT. ST. HELENS SEDIMENT CONTROL, 
CASTLE ROCK, WA 
Authorized construction of sediment and retention 
structures. 
WILLAMETTE RIVER BASIN, OR 
Comprehensive plan for flood control, navigation and 
other purposes in Willamette River Basin. 
General improvements. 
WILLAMETTE RIVER BASIN BANK 
PROTECTION, OR 
Bank protection works, with channel clearing. 
Provide additional protection against flooding. 
Addition of 77 locations to scope of projects. 
WILLOW CREEK LAKE, HEPPNER, OR 
Storage project for flood control, recreation, and fish 
and wildlife. 
BONNEVILLE LOCK AND DAM-LAKE 
BONNEVILLE, OR AND WA 
Existing project was originally authorized Sep. 30, 
1933, by Federal Eergency Administration 
of Public Works. 
Existing project authorized by Congress. 
Completion, maintenance, and operation of 
Bonneville Project under direction of Secretary of War 
and supervision of Chief of Engineers, subject to 
certain provisions herein relating to powers and 
duties of Bonneville Power Administrator. 
Construction, operation, and maintenance of 
recreation facilities. 
Authorizes relocation of town of North Bonneville 
to new town site. 
Acquisition of Steigerwald Lake wetland area. 
COUGAR LAKE, OR 
Rockfill dam. 
Addition of power. 
Strube Lake reregulating dam. 
DETROIT LAKE, OR 
Authorizes concrete gravity structure. 
Addition of power and regulating Big Cliff Dam 
with power. 
S. Committee Print, 73d 
Cong., 2d Sess., (Report 
of Chief of Engineers 
dated Aug. 21, 1933) 
Sec. 4, Flood Control 
Act of 1944 
P.L. 93-251 
P.L. 98-396 
H. Doc. 531, 81st Cong., 
2d Sess. 
P.L. 83-780 
P.L. 87-874 
H. Doc. 544, 75th Cong., 
3d Sess. 
P.L. 858, 80th Cong., 
2d Sess. 
37-36 
H. Doc. 544, 75th Cong., 
3d Sess. 
H. Doc. 531, 81st Cong., 
2d Sess. 
F.C. Act 1936 
H. Doc. 544, 75th Cong., 
3d Sess. 
H. Doc. 531, 81st Cong., 
2d Sess. 
H. Doc. 233, 89th Cong., 
1st Sess. 
37. 
39. 
40. 
41. 
42. 
43. 
44.

TABLE 37-B 
(Continued) 
PORTLAND, OREGON DISTRICT 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
May 17, 1950 
Sep. 3, 1954 
July 14, 1960 
May 17, 1950 
May 17, 1950 
Dec. 22, 1944 
as amended 
Mar. 24, 1965 
June 28, 1938 
Dec. 22, 1944 
as amended 
May 17, 1950 
Sep. 21, 1962 
Oct. 15, 1966 
50. 
May 17, 1950 
Dec. 22, 1944 
as amended 
45. GREEN PETER-FOSTER LAKES, OR 
Authorized Green Peter Dam in lieu of originally 
authorized Sweet Home Lake (1938). 
Addition of power at Green Peter and White Bridge 
Reregulating Dam. 
Changes location of reregulating dam from White 
Bridge location to Foster. 
HILLS CREEK LAKE, OR 
Earth and gravel fill dam. 
JOHN DAY LOCK AND DAM-LAKE 
UMATILLA, OR AND WA 
Multiple-purpose dam, flood control, navigation and 
power. 
Construction, operation and maintenance of 
recreation facilities. 
John Day waterfowl management area. 
LOOKOUT POINT LAKE, OR 
Earth-and-gravel filled dam. 
Construction, operation, and maintenance of 
recreation facilities. 
Addition of power and authorization of Dexter Lake 
as reregulating dam. 
LOST CREEK LAKE, ROGUE RIVER 
BASIN OR 
Rock and gravel fill embankment dam, including 
power. 
Authorizes construction of project but not operation 
for irrigation until local interests agree to repay cost 
allocated. 
THE DALLES LOCK AND DAMLAKE 
CELILO, WA AND OR 
Multiple-purpose dam, flood control, navigation and 
-power. 
Construction, operation, and maintenance of 
recreation facilities. 
1Contains latest published maps. 
2Public Resolution 105, 67th Cong. 
3Public Works Administration. 
4lncludes following work, classified inactive. A channel to 
Hobsonville 200 feet wide and 16 feet deep, with a turning 
basin 500 feet wide at Hobsonville, and regulating works as 
needed. 
5Inactive. 
6Permanent Appropriations Repeal Act. 
7Flood Control Act. 
sClassified deferred. 
9Spur Jetty "B" classified inactive. 
37-37 
H. Doc. 531, 81st Cong., 
2d Sess. 
P.L. 83-780 
F.C. Act 1954 
S. Doc. 104, 86th Cong., 
2d Sess. 
H. Doc. 531, 81st Cong., 
2d Sess. 
H. Doc. 531, 81st Cong., 
2d Sess. 
Sec. 4, Flood Control 
Act of 1944. 
S. Doc. 28, 89th Cong., 
1st Sess. 
H. Doc. 544, 75th Cong., 
3d Sess. 
Sec. 4, Flood Control 
Act of 1944 
H. Doc. 531, 81st Cong., 
2d Sess. 
H. Doc. 566, 87th Cong., 
2d Sess. 
P.L. 89-689, Public Works 
Approp. Act, 1967. 
H. Doc. 531, 81st Cong., 
2d Sess. 
Sec. 4, Flood Control 
Act of 1944 
46. 
47. 
48. 
49.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 37-C OTHER AUTHORIZED NAVIGATION PROJECTS 
Project 
Alsea River, OR 
Astoria Turning Basin, OR1 
Bandon Small Boat Basin, 
Coquille, OR 
Bridges, Columbia River, 
Cascade Locks and Hood River, 
OR (Alteration) 
Cathlamet, WA 1 
Charleston Channel, Coos Bay, OR 
Clatskanie River, OR2 
Cowlitz River, WA 
Cushman-Mapleton Channels 
(Siuslaw River), OR1 
Deep River, WA2 
Depoe Bay, OR1 
Elochoman Slough, WA2 
Grays River, WA2 
Hammond Small Boat Basin, ORX 
Interstate Bridge, Columbia 
River, Portland, OR to 
Vancouver, WA (Alteration) 
Interstate Highway Bridge 
(Barge Channel), OR1 
Lake River, WA 
Lewis River, WA 
Long Tom River, OR 
Mooring for Battleship 
Oregon, OR 
Multnomah Channel, OR2 
Nestucca River, OR 
Oregon Slough, (North Portland 
Harbor), OR2 
Salmon River, OR2 
Smith River, OR2 
South Channel, Government Island, OR 
South Slough (Charleston), OR1 
The Cascades Canal, 
Columbia River, OR 1" 
The Dalles-Celilo Canal, OR 
and WA1' 
Umatilla Harbor, OR 12 
Westport Slough, OR2 
Willamette River above Portland 
and Yamhill River, OR 
Winchester Bay, Umpqua River, OR 
Yaquina Bay and Harbor 
Small Boat Basin, OR' 
Yaquina River, OR1 
Yaquina River, OR 
Youngs and Klaskanine 
River, OR 
Youngs Bay and Youngs 
River, OR2 
Status 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Abandoned 
Abandoned 
Abandoned 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
For Last 
Full Report 
See Annual 
Report For 
1977 
1985 
1944 
1971 
1985 
1969 
1985 
1975 
1963 
1971 
1971 
1941 
1977 
1961 
1963 
1983 
1985 
1982 
1963 
1949 
1974 
1985 
1970 
1939 
1957 
1952 
1966 
1985 
1985 
1979 
1971 
1984 
1979 
Cost to Sep. 30, 1987 
Operation 
and 
Construction Maintenance 
2,000 
870,139 
1,173,524 
1,081,806 
171,467 
1,197,300 
19,2403 
277,436 
329,423 
15,384 
145,5883 
18,6416 
2,500 
519,0907 
1,154,1628 
15,281 
2,700 
58,132 
4,000 
25,000 
437,6699 
6,000 
16,881 
2,145 
143,120 
221,80016 
26,821 
3,903,780 
4,716,205 
16,276 
862,918 
1,616,369 
891,69513 
195,31314 
28,800 
2,000 
9,348 
26,237 
194,8934 
1,474,036 
32,768 
16,648 
35,670 
- 
58,127 
685,677 
90,514 
205,130 
559,858 
2,833,888 
171,909 
17,900,293 
749,69415 
34,449 
'Authorized by Chief of Engineers (Sec. 107). 
2Channel adequate for present commerce. 
3Includes $15,537 for previous project. 
4Includes $23,489 for previous project. 
5Excludes $42,000 contributed funds. 
6Excludes $86,586 contributed funds. 
7Excludes $75,000 contributed funds. 
8Non-Federal funds, $1,204,100. 
9Includes $419,557 for Sec. 107 project. 
'�Project abandoned due to flooding by Bonneville Dam 
pool. 
"Project abandoned due to flooding by The Dalles Dam 
pool.
12Project transferred to Portland District from Walla Walla 
District FY 1974 and abandoned due to flooding by the John 
Day Dam pool. 
"Excludes $969,342 contributed funds. 
"Excludes $50,565 contributed funds. 
'5Excludes $3,000 contributed funds. 
'6Includes $102,000 contributed funds. 
37-38 
_ __ ___ __ __ I __ _~__ _ I ~____ _ 
- --

PORTLAND, OREGON DISTRICT 
OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
Project 
COLUMBIA RIVER BASIN 
Blind Slough Diking District, 
Clatsop County, OR 
Consolidated Diking and 
Improvement District 1, Cowlitz 
County, WA 
Deep River Area, Wahkiakum 
County, WA 
Deer Island Area, Columbia 
County, OR 
Diking District 2, Clatsop 
County, OR 
Diking Dist 5, Clatsop 
County, OR 
Diking and Improvement 
District 5, Cowlitz County, WA 
Diking District 1 and 3 (Puget 
Island) and Little Island, 
Wahkiakum County, WA 
Diking Improvement District 
1, Pacific County, WA 
Diking and Improvement 
District 4, Wahkiakum 
County, WA 
Drainage District 1, Clatsop 
County, OR 
John Day River Area, Clatsop 
County, OR 
Karlson Island, Clatsop 
County, OR 
Knappa Area, Clatsop County, OR 
Lewis and Clark River Area, 
Clatsop County, OR 
Lower Cowlitz River Area, 
Clatsop County, OR 
Magruder Drainage District, 
Columbia County, OR 
Marshland Drainage District, 
Columbia County, OR 
Midland Drainage District 
Columbia County, OR 
Multnomah Drainage District 1, OR 
Peninsula Drainage District 1, 
Multnomah County, OR 
Peninsula Drainage District 2, 
Multnomah County, OR 
Port of Kalama, WA 1 
Rainier Drainage District, 
Columbia County, OR 
Sauvie Island Areas A and B, 
Multnomah County, OR 
Scappoose Drainage District, OR 
Skamokawa Creek Area, 
Wahkiakum County, WA 
Wahkiakum County Consolidated 
Diking District No. 1, WA 
Tenasillahe Island, Clatsop 
County, OR 
Upper Grays River Area, WA 
State Hwy 101 & 401, Columbia River, WA 
For Last Cost to Sep. 30, 1987 
Full Report Operation 
See Annual and 
Status Report For Construction Maintenance 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
1939 
1941 
1942 
1943 
1940 
1940 
1940 
1941 
1941 
1951 
1939 
1942 
1941 
1942 
1942 
1962 
1940 
1940 
1939 
1951 
1942 
1942 
1942 
1951 
1984 
1946 
1985 
1939 
1947 
1985 
163,397 
163,291 
69,724 
574,123 
25,609 
25,609 
161,381 
258,795 
26,810 
169,542 
240,939 
33,080 
25,773 
18,789 
158,419 
181,652 
61,186 
39,475 
77,7743 
593,0344 
211,160 
241,148 
99,844 
47,662 
1,623,505 
3,991,558 
178,885 
5,289,833 
133,778 
61,263 
504,64213 
37-39 
TABLE 37-E

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 37-E OTHER AUTHORIZED FLOOD 
(Continued) CONTROL PROJECTS 
For Last Cost to Sep. 30, 1987 
Full Report Operation 
See Annual and 
Project Status Report For Construction Maintenance 
Walluski River, Clatsop 
County, OR Completed 1942 66,932 
Warrenton Diking District 1, 
Clatsop County, OR Completed 1940 69,503 
Warrenton Diking District 2, 
Clatsop County, OR Completed 1940 74,596 
Webb District Improvement Co., 
Columbia County, OR Completed 1940 84,592 
Westland District Improvement Co., 
Columbia County, OR Completed 1940 205,531 
Westport District, Columbia and 
Clatsop Counties, OR Completed 1943 40,658 
Woodson Drainage District, 
Columbia County, OR Completed 1940 22,797 
Youngs River Dikes, Clatsop 
County, OR Completed 1942 248,802 - 
Total Columbia River Basin 16,399,775 - 
LEWIS RIVER BASIN 
Diking and Improvement District 11, 
Cowlitz County, WA Completed 1943 172,521 
COWLITZ RIVER BASIN 
Cowlitz County Drainage 
Improvement District 1, WA Completed 1939 42,978 
Diking Improvement District 13, 
Cowlitz County, WA Completed 1939 28,592 
Huntington Avenue, Castle Rock, WA Completed 1985 250,000 - 
Total Cowlitz River Basin 442,735 - 
LOWER COLUMBIA 
RIVER BASIN 
Beaver Drainage District, OR Completed 1984 3,131,944 - 
Columbia Drainage District 1, OR Inactive - - - 
Cowlitz County Consolidated Diking 
Improvement District No. 2, WA Completed 1977 1,661,367 
Cowlitz County Diking 
Improvement District 2, WA Completed 1967 363,000 
Cowlitz County Diking 
Improvement District 13, WA Completed 1967 65,345 - 
Cowlitz County Diking 
Improvement District 15, WA Completed 1967 304,794 - 
Cowlitz River, Hopkins Creek, WA1 Completed - 236,860 - 
Deer Island Drainage District, OR Inactive - - - 
Hayden Island, OR Inactive 1950 - - 
Midland Drainage District, OR Completed 1971 304,511 
Multnomah County Drainage 
District 1, OR Completed 1964 1,499,186 - 
Peninsula Drainage District 2, OR Active 1961 35,265 - 
Rainier Drainage District, OR Completed 1967 593,945 
Sandy Drainage District, OR Completed 1954 154,012 - 
Sauvie Island Drainage 
District, OR Completed 1966 674,137 - 
Vancouver Lake Area, WA Deferred 1981 889,391 - 
Wahkiakum Co. Diking 
District 4, WA Inactive 1971 48,619 
37-40

TABLE 37-E 
(Continued) 
PORTLAND, OREGON DISTRICT 
OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
For Last 
Full Report 
See Annual 
Project Status Report For 
Washougal Area Levees, 
Clark County, OR 
Woodson Drainage District, OR 
Total Lower Columbia River Basin 
WILLAMETTE RIVER BASIN 
Amazon Creek, OR 
Cascadia Lake, OR 
Gate Creek Lake, OR 
Holley Lake, OR 
Sandy River and Sleepy Hollow, OR' 
Shelton Ditch, OR 
Willamette River Basin 
Channel Clearing and Snagging 
Total Willamette River Basin 
ALL OTHER FLOOD CONTROL 
Arlington, Alkali Canyon, OR9 
Bear Creek, Medford, OR1 
Beaver Creek Near Tillamook, OR2 
Castle Rock, Cowlitz River, WA 
Catching Inlet Drainage District 
Coos River, OR2 
Chewaucan River, Paisley, OR1 
Clackamas River at Dixon 
Farm Location, OR2 
Days Creek Lake, OR (Phase I) 
Depoe Bay, Lincoln County, OR' 
Johnson Creek, OR 
McDonald Dike Road, Nehalem River, OR 
McKenzie River Near Walterville, OR2 
Miami River, OR1 
Mill Four Drainage District, 
Yaquina River, OR 
Molalla River at Milk Creek 
Location, OR2 
Molalla River at Ressel 
Location, OR2 
Nestucca River, Condor Road, OR 1 
Nestucca River, Vicinity 
Pacific City, OR1 
Pendleton Levees, Umatilla River, OR"1 
(a) Riverside Area Units 
(b) State Hospital and City 
Areas (Zone 1) 
(c) State Hospital and City 
Areas (Zone 2)2 
Pendleton, Umatilla River, 
OR0 
Reedsport Levees, Umpqua 
River, OR2 
Rogue River, OR' 
Salmon Creek at Oakridge, 
OR2 
Salmon Creek Near Vancouver, WA 
Siuslaw River, Lane County, 
OR' 
Stillwell Drainage District, 
Tillamook Bay, OR2 
Sumner Parker Airport, OR1 
Completed 
Completed 
Completed 
Deferred 
Deferred 
Deferred 
Completed 
Inactive 
Inactive 
Abandoned 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Deferred 
Completed 
Active 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Deferred 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
1973 
1964 
1960 
1976 
1972 
1963 
1967 
1950 
- 
1967 
1957 
1959 
1952 
1982 
1981 
1985 
1967 
1948 
1955 
1952 
1960 
1959 
1960 
1939 
1971 
1960 
1985 
1961 
Cost to Sep. 30, 1987 
Operation 
and 
Construction Maintenance 
1,803,488 
162,500 
11,928,364 
1,214,3006 
1,066,1147 
840,0008 
241,992 
276,700 
39,624 
3,678,731 
23,439 
23,050 
106,198 
104,921 
182,655 
42,761 
70,84510 
1,307,216 
22,963 
170,245 
29,500 
148,358 
15,321 
118,433 
55,007 
55,189 
11,690 
16,000 
9,100 
267,748 
161,540 
143,263 
968,71612 
86,230 
288,447 
435,00014 
215,939 
176,351 
92,500 
3741

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 37-E 
(Continued) 
OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
Project 
Trask River, Tillamook County, 
OR" 
Tualatin, OR 
Umatilla River, Stanfield, OR' 
Umatilla River, Thorn Hollow, OR 
Umpqua River and 
Tributaries, OR 
Vicinity of Nehalem, Nehalem 
River, OR 
Wilson River, Vicinity 
Highway 101, OR' 
Total All Other Flood Control 
Status 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
'Authorized by Chief of Engineers (Sec. 14). 
2Authorized by Chief of Engineers (Sec. 205). 
3Includes $26,241, Emergency Relief Act funds. 
4Excludes $25,000 contributed funds. 
6Previous completed project, $138,956; $15,056 engineering 
costs project constructed by local interests. 
6Excludes $154,751 contributed funds. 
7Includes $112,000 pro rata share of site selection in lieu of 
Sweet Home. 
For Last 
Full Report 
See Annual 
Report For 
1984 
1985 
1985 
1952 
1952 
Cost to Sep. 30, 1987 
Operation 
and 
Construction Maintenance 
121,273 
1,803,094 
33,835 
154,600 
428,881 
45,677 
30,000 
7,965,985 
8Includes $95,000 pro rata share of site selection in lieu of 
Quartz Creek Lake. 
9Project transferred from Walla Walla District FY 1974 
and abandoned due to flooding by the John Day Dam pool. 
Includes $3,328 FY 1960 preauthorization costs, Sec. 205, P.L. 
80-85. See FY 1960 Annual Report, page 1887. 
1'Excludes $2,520 contributed funds. 
"Reported by Walla Walla District prior to 1974. 
'12Excludes $230,070 contributed funds for new work and 
$31,284 Government furnished sheet steel pile. 
37-42

PORTLAND, OREGON DISTRICT 
TABLE 37-F OTHER AUTHORIZED MULTIPLE PURPOSE 
PROJECTS, INCLUDING POWER 
For Last Cost to Sep. 30, 1987 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Restoration of Indian Fishing Grounds, 
Bonneville, OR Completed 1954 350,0001 
TABLE 37-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report Deauthorized Expended Expended 
Area East of Albany, OR - 1977 - - 
Bachelor Island, WA - 1977 - - 
Bear Creek, Long Tom River, OR 1966 1971 4,559 - 
Calapooya River OR 1959 1965 11,595 - 
Cascadia Lake, OR - 1987 954,1141 - 
Clatskanie River Area, Columbia County, OR 1960 1965 268 - 
Clatskanie Drainage Dist. 1, OR 1964 1978 18,543 - 
Clatsop County Drainage District 1, OR 1960 1974 4,472 - 
Clatsop County Diking District 3, OR 1938 1961 258 - 
Clatsop County Diking District 4, OR - 1978 - - 
Clatsop County Diking District 6, OR 1961 1978 8,824 - 
Columbia Drainage District No. 1, OR - 1987 - - 
Columbia Slough, OR 1953 1978 21,352 - 
Coquille River, OR 1948 1953 908 - 
Cowlitz County Consolidated Diking 
Improvement Dist. 1 OR - 1977 - - 
Cowlitz River at Randle, WA 1962 1977 11,095 - 
Coyote and Spencer Creek, Long Tom River, OR 1960 1970 6,819 - 
Deer Island Drainage District, OR - 1987 - - 
East Muddy and Lake Creek, OR 1959 1970 6,465 - 
Ferguson Creek, Long Tom River, OR - 1978 - - 
Flat Creek, Long Tom River, OR - 1977 - - 
Floodwall and Levees at Portland, OR - 1977 - - 
Gate Creek Lake, OR - 1987 745,0012 - 
Holley Lake, OR 1963 1987 241,9923 - 
John Drainage District, OR 1961 1979 23,754 - 
John Day River OR 1974 1974 210,220 - 
Kalama River (South Area) Levee, Cowlitz County, WA 1969 1978 55,594 - 
Lake River Delta Area, WA - 1977 - - 
Lewis River Area, WA - 1978 - -- 
Magruder Drainage District, OR 1940 1974 774 - 
Mud and Basket Slough Rickreall Creek, OR - 1977 - - 
Pendleton Levees, Riverside Area, OR - 1987 9,000 - 
Peninsula Drainage District 1, OR 1942 1977 43,292 - 
Pilot Rock, Birch Creek, OR 1963 1968 4,558 - 
Prescott Area, Columbia County, OR 1941 1978 125 - 
Prineville Area, Crooked River and Ochoco Creek, OR 1962 1977 11,318 - 
Pudding River, OR 1950 1979 5,000 - 
Shelton Ditch Marion County, OR 1967 1987 39,624 - 
Skamokawa (Steamboat Slough), WA 1939 1979 - - 
Soap Creek, WA - 1977 - - 
Turner Prairie, Mill Creek, OR - 1978 - - 
Umatilla River (Echo), OR 1960 1964 24,145 - 
Umpqua River-Scholfield River, OR - 1987 4,000 - 
Waldo Lake Tunnel, OR - 1958 - - 
West Muddy Creek and Mary's River, OR 1962 1970 4,056 - 
Westport Slough, OR (Modification for 32-foot channel) 1966 1977 - - 
Wiley Creek Lake, OR - 1960 112,000 - 
Willamette River above Portland and 
Yamhill River, OR (uncompleted portions) - 1987 - - 
Willamette Falls Fishladder, OR - 1961 - - 
Willamette River at Willamette Falls, OR 1948 1987 142,883 - 
'Excludes Pro-rata share of $112,000 for Sweet Home 3Excludes $100,000 preauthorization study costs. 
Reservoir. 
2Excludes Pro-rata share of $95,000 for Quartz Creek 
Reservoir. 
37-43

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 37-H COLUMBIA AND LOWER WILLAMETTE RIVER 
BELOW VANCOUVER, WA, AND PORTLAND, OR 
TOTAL COST OF EXISTING PROJECT TO SEP. 30, 1987 
(See Section 3 of Text) 
Funds New Work Maintenance Total 
Regular 26,235,146 234,760,144 260,995,290 
Public Works 446,296 14,515 460,811 
Emergency Relief Administration 138,449 98,668 237,117 
Total U.S. 26,819,891 234,873,327 261,693,218 
Contributed Prior to 1964 223,026 24,320 247,346 
Contributed (1975) 35 to 40-foot Channel 442,928 - 442,928 
Total Contributed 665,954 24,320 690,274 
Total All Funds 27,485,845 234,897,647 262,383,492 
TABLE 37-I NAVIGATION ACTIVITIES PURSUANT TO SECTION 107, 
PUBLIC LAW 86-645 (PREAUTHORIZATION) 
Study Identification Fiscal Year Costs (1987) 
Coquille River, Bandon, OR 15,031 
Columbia River, Willow Bar, OR 25,489 
Columbia River, Henrici Bar, WA 23,466 
Columbia River, Kalama, WA 32,052 
Columbia River, Longview, WA 23,702 
Astoria Deep Draft Anchorages, OR 32,427 
Nehalem Bay, OR 7,484 
Tongue Point, OR 25,934 
Columbia River, Vancouver, WA 17,061 
Yaquina Bay and Bar, OR 22,643 
TOTAL 225,289 
TABLE 37-J PROJECT CONDITION SURVEYS 
Project Date Survey Conducted 
Skamokawa Creek, WA September 1987 
Tillamook, OR May/September 1987 
Willamette River, OR January, 1987 
Yaquina River, OR March 1987 
Youngs Bay, OR January/September 1987 
TABLE 37-K WILLAMETTE RIVER AT 
WILLAMETTE FALLS, OR 
PRINCIPAL FEATURES OF EXISTING CANAL AND LOCKS 
(See Section 24 of Text) 
Usable Lock Dimensions Series of 4 locks, each 175 feet by 37 feet' 
Lift of Each Lock Lock I (Lower), 22.5 feet; Lock 2, 8.7 feet; 
Lock 3, 10.9 feet and Lock 4 (Upper), 8.1 feet 2 
Depth of Miter Sills at Lower Water Lower Lock, 8.4 feet; Upper Lock, 6 feet 
Character of Foundation Rock 
Kind of Dam Fixed 3 
Type of Construction Concrete 
Year of Completion 1873; Purchased by United States Apr. 26, 1915 
Cost Unknown; purchase price $375,000 
1A guard lock 210 by 40 feet, which is used only at higher 
states of water, is at upper end of canal basin. 
2A concrete division wall, 1,227 feet long, extending from 
Lock 4 to Guard Lock, separates upper basin of canal from 
head race, which formerly led directly from basin and supplied 
water for powerplants operated by Crown Zellerbach Corp., 
and Portland Ry., Light & Power Co. which is now being 
operated by Portland General Electric Go. 
3The dam is owned by private parties. 
37-44

PORTLAND, OREGON DISTRICT 
TABLE 37-L FLOOD CONTROL ACTIVITIES PURSUANT TO 
SECTION 205, PUBLIC LAW 80-858 (PREAUTHORIZATION) 
Study Identification 
Clatsop County Drainage District Nos. 2 and 5, OR 
Clatsop County Drainage District No. 1, OR 
Deer Creek, OR 
Libby Dike Coal Bank Slough, OR 
McCorkle Creek, WA 
Warrenton Diking District No. 1, OR 
Salmon Creek Levee, Oakridge, OR 
Tutuilla Creek, OR 
Umatilla River, at Riverside, OR 
Youngs R. Diking District #22, Clatsop, OR 
TOTAL 
Fiscal Year Costs (1987) 
1,612 
7,500 
7,452 
40,844 
11,057 
125,110 
7,000 
37,449 
33 
6,338 
$244,395 
See 
Section Date of Peak Inflow Storage Used 
in Text Project Peak Inflow Cu. Ft./Sec. Acre/Feet 
Applegate Lake, OR 
Blue River Lake, OR 
Cottage Grove Lake, OR 
Cougar Lake, OR 
Detroit Lake, OR 
Dorena Lake, OR 
Fall Creek Lake, OR 
Fern Ridge Lake, OR 
Foster Lake, OR 
Green Peter Lake, OR 
Hills Creek Lake, OR 
Lookout Point Lake, OR 
Lost Creek Lake, OR 
February 2, 1987 
November 27, 1986 
November 27, 1986 
November 28, 1986 
November 27, 1986 
November 28, 1986 
November 28, 1986 
November 28, 1986 
November 28, 1986 
November 27, 1986 
November 27, 1986 
November 28, 1986 
February 2, 1987 
37-45 
TABLE 37-M FLOOD CONTROL RESERVOIR OPERATIONS 
23. 
24. 
25. 
43. 
44. 
27. 
29. 
30. 
45. 
45. 
46. 
48. 
49. 
2,920 
5,400 
3,395 
5,920 
15,480 
9,880 
6,930 
6,900 
20,700 
17,810 
7,650 
13,680 
4,320 
2,410 
14,300 
6,700 
12,500 
46,000 
24,400 
9,300 
7,500
0 
22,000 
5,000 
42,000 
2,000 
--

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 37-N LOWER COLUMBIA RIVER BASIN, OR AND WA 
LEVEES AND IMPROVEMENTS TO EXISTING WORKS 
(See Section 37 of Text) 
Estimated Cost 
of Work 
Location Approved 1987 
Beaver Drainage District, OR 
Cowlitz County Diking Improvement I)istrict 2, WA 
Cowlitz County Diking Improvement District 13, WA 
Cowlitz County Diking Improvement District 15, WA 
Cowlitz County Consolidated Diking Improvement District 2, WA 
Midland Drainage District, OR 
Multnomah County Drainage District 1, OR 
Peninsula Drainage District No. 2, OR 
Rainier Drainage District, OR 
Sandy Drainage District OR 
Sauvie Island Drainage bistrict, OR 
Scappoose Drainage District, OR 
Wahkiakum County Consolidated Diking District 1, WA 
Woodson Drainage District, OR 
Total Estimated Cost, Federal Funds 
Estimated Non-Federal Cost 
Locations deauthorized or reclassified inactive and excluded from above cost estimate: 
Bachelor Island, WA (Deauthorized - 1977) 
Clatskanie Drainage District, OR (Deauthorized - 1978) 
Clatskanie River Area, OR (Deauthorized - 1965) 
Clatsop County Drainage District 1, OR (Deauthorized - 1974) 
Clatsop County Diking District 4, OR (Deauthorized - 1978) 
Clatsop County Diking District 6, OR (Deauthorized - 1978) 
Columbia Drainage District 1, OR (Deauthorized - 1987) 
Cowlitz County Consolidated Diking Improvement District 1, WA (Deauthorized - 1977) 
Deer Island Drainage District, OR (Deauthorized - 1987) 
Hayden Island, OR (Inactive) 
John Drainage District, OR (Deauthorized - 1979) 
Kalama River Levee, WA (Deauthorized - 1978) 
Lake River Delta Area, WA (Deauthorized - 1977) 
Lewis River Area, WA (Deauthorized - 1977) 
Magruder Drainage District, OR (Deauthorized - 1977) 
Wahkiakum County Diking District 4, WA (Inactive) 
'Cost is for Engineering only. Project was constructed by local interests. 
37-46 
$ 2,857,366 
363,000 
65,345 
304,794 
1,661,367 
304,511 
1,499,186 
3,600,000 
593,945 
15,0561 
674,137 
3,567,248 
5,289,833 
162,500 
20,958,288 
$ 3,600,000 
- -- I----~----~ ~'~-11--- ~----1--------~--'-L---- --- --~~--~--- -~-I ---

TABLE 37-0 
PORTLAND, OREGON DISTRICT 
WILLAMETTE RIVER BASIN 
COMPREHENSIVE PLAN 
(See Section 43 of Text) 
Project 
Blue River Lake, McKenzie Basin' 3 
Cascadia Lake, South Santiam River4 " 1 
Channel Clearing and Snagging on Willamette 
River and Major Tributaries 
Channel Improvements for Flood Control 
Major Drainage on 16 Streams 
Tributary to Willamette River' 7 
Cottage Grove Lake, Coast Fork' 
Cougar Lake, South Fork McKenzie' 3 
Detroit Lake, Including Big Cliff Lake, 
North Santiam River' 
Dorena Lake, Row River' 
Fall Creek Lake, Middle Fork' 
Fern Ridge Lake, Long Tom River' 
Gate Creek Lake, McKenzie Basin3 5 11 
Green Peter-Foster Lakes, Middle Santiam' 4 
Hills Creek Lake, Middle Fork' 
Holley Lake, Calapooya River 5 " 
Lookout Point Lake, Including Dexter Lake, 
Middle Fork' 
Strube Lake & Cougar Additional Unit, 
(South Fork McKenzie) (Modification to 
Cougar Lake) 
Waldo Lake Tunnel and Reregulating Works 
North Fork, Middle Fork, Willamette River 
Willamette River Bank Protection' 
'--------- 
'See individual reports for details of the project. 
2Actual cost. 
3For construction in lieu of originally authorized Quartz 
Creek Lake. 
4For construction in lieu of originally authorized Sweet 
Home Lake. 
6Project classified deferred. 
6Project classified inactive. 
7Does not include Reclassified Locations. 
8Authorization rescinded August 28, 1958, Public Law 
85-820. 
9Includes cost of Recreation Facilities at Completed 
Projects, (710). 
1'Does not include $96,000 pro rata share of site selection 
costs in lieu of Quartz Creek Lake and Strube Lake and Cougar 
Additional Units. 
11Authorization rescinded November 17, 1986, Public Law 
99-662. 
37-47 
Authorizing Act ---- 
May 17, 1950, H. Doc. 531, 
81st Cong., 2d Sess. 
Oct. 23, 1962, H. Doc. 403, 
87th Cong., 2d Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2d Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2d Sess. 
June 28, 1938, H. Doc. 544, 
75th Cong., 3d Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2d Sess. and 
Sep. 3, 1954, S. Doc. 131, 
83d Cong., 2d Sess. 
June 28, 1938, H. Doc. 544, 
75th Cong., 3d Sess. and 
June 30 1948, Public Law 
858, 80th Cong., 2d Sess. 
June 28, 1938, H. Doc. 544, 
75th Cong., 3d Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2d Sess. 
June 28, 1938, H. Doc. 544, 
75th Cong., 3d Sess. 
Oct. 23 1962, H. Doc. 403, 
87th Cong., 2d Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2d Sess. and 
Sep. 3, 1954, S. Doc. 131, 
83d Cong., 2d Sess. and 
July 14, 1960, S. Doc. 104 
86th Cong., 2d Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2d Sess. 
May 17, 1950, H. Doc. 531, 
81st Cong., 2d Sess. 
June 28, 1938, H. Doc. 544, 
75th Cong., 2d Sess. and 
May 17, 1950, H. Doc. 531, 
81st Cong., 2d Sess. 
Oct. 23 1962, H. Doc. 403, 
87th Cong., 2nd Sess. 
May 17, 1950, H. Doc. 5318, 
81st Cong., 2d Sess. 
June 22, 1936, Special Report 
Division Engr., June 28, 
1938, H. Doc. 544, 75th 
Cong. 3d Sess., and May 17, 
1950, H. Doc. 531, 81st 
Cong., 2d Sess. 
Estimated 
Federal 
Cost (1987) 
$ 32,038,2252 
104,000,000 
(1975) 
3,005,000 
(1960) 
1,214,3003 
4,013,1232 9 
56,750,4052 1 
62,729,6982 
14,568,2622 1 
22,118,2642 1 
8,526,9352 9 
127,000,000 
(1980) 
84,005,7882 
45,700,6192 
13,300,000 
88,238,3952 9 
106,000,000 
29,200,000 
(1987)

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 37-P PRINCIPAL DATA CONCERNING NAVIGATION 
LOCK, SPILLWAY DAM, AND POWERPLANT 
Project 
Bonneville Lock and Dam, 
OR and WA - Lake 
Bonneville 
(See Section 46 of Text) 
John Day Lock and Dam, 
OR and WA - Lake 
Umatilla (See Section 51 
of Text) 
NAVIGATION LOCK 
Dimensions: 
Clear Width of Chamber 
Greatest Length Available for Full Width 
Lift (Vertical): 
At Extreme Low Water and Normal Pool Level 
At Normal River Stage 
At Extreme High Water 
Depth Over Miter Sills at Adopted Low Water 
Character of Foundation 
Opened to Navigation
SPILLWAY DAM 
Type of Construction 
Completed 
Capacity 
Elevation of Gate Sills on Crest of Spillway 
Height Above Lowest Foundation 
Length of Dam Proper 
Length of Dam Overall 
Width at Base 
Gate Openings 
Crest Overflow (Above Mean Sea Level) 
Pool Elevation (Normal) (Above Mean Sea Level) 
POWERPLANT 
Length 
Length (Second Powerhouse) 
Width 
Width (Second Powerhouse) 
Height (Roof to Bedrock) 
Height (Roof to Bedrock) (Second Powerhouse) 
Generator (Station Unit) 
Generators 
Generators (Second Powerhouse) 
Fishwater Supply Units (Second Powerhouse) 
Total Rated Capacity 
Speed 
NAVIGATION 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation
SPILLWAY DAM 
'rpe of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
76 Feet 
500 Feet 
66 Feet 
59 Feet 
About 30 Feet 
24.2 Feet 
Andesite 
January 1938 
Concrete Gravity 
1938 
1,600,000 Cubic Feet 
Per Second 
23.3 Feet 
About 170 Feet 
1,090 Feet 
1,230 Feet 
200 Feet 
18 
24 Feet 
72 Feet 
1,027 Feet 
953 
190 Feet 
235 
190 Feet 
200 Feet 
1-4,000 kw 
2 @ 43,200 kw each 
8 @ 54,000 kw each 
8 @ 66,500 kw each 
2 @ 13,100 kw each 
1,076,600 kw 
75 Revolutions per 
Minute 
86 Feet 
669 Feet 
97 Feet 
105 Feet 
113 Feet 
15 Feet 
April 1968 
Concrete Gravity 
March 1968 
2,250,000 cfs 
210 
Tainter 
50 Ft. by 58.5 Ft. 
20 
37-48

PORTLAND, OREGON DISTRICT 
TABLE 37-P 
(Continued) 
PRINCIPAL DATA CONCERNING NAVIGATION 
LOCK, SPILLWAY DAM, AND POWERPLANT 
Project 
POWERPLANT 
The Dalles Lock and Dam, 
WA and OR - Lake Celilo 
(See Section 54 of Text) 
Length: 
Width 
Generating Units: 
Number Installed 
Space for Additional 
Rating, Each 
Total Installed Capacity 
Total Potential Capacity 
Maximum Structural Height 
First Power-On-Line
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Flood Control Storage 
Lake Length 
Lake Water Surface Area at 
Elevation 268 
Navigation Channel, Depth by Width 
Length of Shoreline 
NAVIGATION LOCK 
Lift Normal 
Net Clear Length 
Net Clear Width 
Normal Depth Over Upper Sill 
Minimum Depth Over Lower Sill 
Opened to navigation
SPILLWAY DAM 'rype 
Elevation of Crest 
Top of Crest Gates 
Number of Gates 
Size of Gates 
Height (Foundation to Crest) 
Design Flood 
POWERPLANT 
Powerhouse Dimensions 
Generators Main Units 
Generators Main Units 
Fishwater Supply Units 
Total Rated Capacity 
Station Service Units 
1,975 Feet 
243 Feet 
16 
4
135,000 kw 
2,160,000 kw 
2,700,000 kw 
235 Feet 
July 1968 
268-257 
276 
500,000 Ac.-Ft. 
76.4 Miles 
55,000 Acres 
15 Ft. by 250 Ft. 
200 Miles 
Single Lift 
87.5 Feet 
675 Feet 
86 Feet 
20 Feet 
15 Feet 
March 17, 1957 
Controlled 
121 Ft. msl 
162 Ft. msl 
23 
50 by 43 Feet 
120 Feet 
2,290,000 cfs 
240 by 2,150 Feet 
14 @ 78,000 kw each 
Additional 8 @ 
86,000 kw each 
2 @ 13,500 kw each 
1,807,000 kw 
2 @ 3,000 kw each 
37-49

SEATTLE, WA, DISTRICT * 
This District comprises Washington State except 
southern and southeastern portions, northern Idaho, 
and northwestern Montana embraced in drainage 
basins tributary to Pacific Ocean south of international 
boundary to Cape Disappointment, and to 
Columbia River above Yakima River, inclusively. 
IMPROVEMENTS 
Navigation 
1. Anacortes Harbor, WA ................. 
2. Bellingham Harbor, WA ............... 
3. Edmonds Harbor, WA ................. 
4. Everett Harbor and Snohomish 
River, WA ............................... 
5. Grays Harbor and Chehalis 
River, WA ............................... 
6. Kenmore Navigation Channel, WA ...... 
7. Lake Crockett, WA ...................... 
8. Lake Washington Ship Canal, WA ....... 
9. Navigation Work under Special 
Authorization ......................... 
10. Olympia Harbor, WA .................... 
11. Port Townsend, WA ...................... 
12. Project Condition Surveys .............. 
13. Puget Sound and its 
Tributary Waters, WA ................. 
14. Quillayute River, WA .................... 
15. Seattle Harbor, WA ...................... 
16. Swinomish Channel, WA ............... 
17. Tacoma Harbor, WA ................... 
18. Waterway Connecting Port Townsend 
and Oak Bay, WA .................. 
19. Willapa River and Harbor and 
Naselle River, WA ...................... 
Beach Erosion Control 
20. Beach Erosion Work under Special 
Authorization ........................... 
Flood Control 
21. Elwha Klallam Reservation, Elwha, 
WA ..................................... 
22. Flood Control Work under Special 
Authorization ........................... 
23. Howard A. Hanson Dam, WA .......... 
24. Inspection of Completed Flood 
Control Projects ...................... 
25. Inspection of Completed PL-99 Works .... 
26. Little Quilcene River, near 
Quilcene, WA ................ ......... 
27. Mud Mountain Dam, WA ................ 
Page 
38-2 
38-2 
38-2 
38-3 
38-3 
38-4 
38-4 
38-4 
38-5 
38-5 
38-5 
38-5 
38-5 
38-6 
38-6 
38-7 
38-7 
28. Scheduling Flood Control 
Reservoir Operations ................... 
29. Spokane River, Spokane, WA .......... 
30. Stillaguamish River, WA ............... 
31. Tacoma, Puyallup River, WA .......... 
32. Wynoochee Lake, WA ................. 
Multiple-Purpose Projects, 
Including Power 
33. Albeni Falls Dam, ID ................. 
34. Chief Joseph Dam - Rufus Woods 
Lake, W A .............................. 
35. Libby Dam - Lake Koocanusa, MT ...... 
General Investigations 
36. Surveys ................ ............ 
37. Collection and Study of 
Basic D ata ................ .. .......... 
38. Preconstruction Engineering 
and Design ............ .. ............ 
Page 
38-10 
38-10 
38-10 
38-10 
38-11 
38-11 
38-11 
38-11 
38-12 
38-12 
38-12 
Tables 
38-7 Table 38-A Cost & Financial Statement .... 38-14 
Table 38-B Authorizing Legislation ...... 38-19 
38-8 Table 38-C Other Authorized Navigation 
Projects ..................... 38-25 
Table 38-D Not Applicable 
Table 38-E Other Authorized Flood Control 
38-8 Projects ............ .... 38-26 
Table 38-F Other Authorized Multiple 
Purpose Projects, Including 
Power ...................... 38-30 
38-8 Table 38-G Deauthorized Projects ......... 38-30 
Table 38-H Lake Washington Ship Canal, WA 
38-9 Principal Features of Double 
38-9 Lock and Dam ................. 38-31 
Table 38-I Project Condition Surveys .... 38-31 
38-9 Table 38-J Flood Control Activities 
38-9 Pursuant to Section 205, Public 
Law 80-858 ................... 38-32 
38-9 Table 38-K Emergency Flood Control Activities - 
38-9 Public Law 99, 84th Congress .. 38-32 
38-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. ANACORTES HARBOR, WA 
Location. On northern point of Fidalgo Island in 
Puget Sound, 17 miles south of Bellingham, WA, and 64 
miles north of Seattle. The main harbor is on Guemes 
Channel. (See NOAA Survey Chart 18427.) 
Existing project. Channel in Capsante Waterway, 
12 feet deep and 150 to 250 feet wide, between east side of 
Q Avenue and deep water in Fidalgo Bay, a distance of 
2,850 feet; and mooring basin 12 feet deep, 570 feet wide, 
and 960 feet long adjacent to north side of Capsante 
Waterway, protected by two pile breakwaters, each 470 
feet long, east and southeast of basin. Plane of reference 
is mean lower low water. Range between mean lower low 
water and mean higher high water is 8.2 feet. Extreme 
range is about 15.5 feet. Project was completed in July 
1957, excluding the inactive portion and inner portion of 
boat basin. (For further details, see Annual Report for 
1958.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 24 piers and wharves in 
the Port of Anacortes; 15 on Guemes Channel, 3 on Capsante 
Waterway, and 7 on Fidalgo Bay. Three wharves 
on Guemes Channel are open for public use; of these, one 
is publicly owned and operated and used for handling 
general cargo in foreign and domestic trade. In addition, 
two wharves are used for ferries plying to the San Juan 
Islands and to Vancouver Island, British Columbia. 
Both are publicly owned and operated. Two of the 
wharves on Capsante Waterway and basin are publicly 
owned and operated and used for receiving petroleum 
products, and as a moorage for fishing and pleasure 
craft. All other wharves are used for general industrial 
purposes. In addition, there are two oil-refinery wharves 
located to the south of Capsante Waterway that are 
privately owned and operated and used for handling 
petroleum products in foreign and domestic trade. These 
facilities are considered adequate for existing commerce. 
(See Port Series No. 37 - Ports of Everett, Bellingham, 
Port Angeles, and Anacortes, WA, revised 1987.) 
Operations during fiscal year. Maintenance, hired 
labor: Conducted channel condition surveys. Channel 
sediments were analyzed to determine suitability of 
dredged material for open-water disposal. Puget Sound 
Dredged Disposal Analysis study costs resulted in an 
expenditure of $152,400. 
2. BELLINGHAM HARBOR, WA 
Location. Part of Bellingham Bay, an arm of Puget 
Sound, at Bellingham, in northwestern Washington. 
(See NOAA Survey Chart 18424.) 
Existing project. Channel 30 feet deep in Whatcom 
Creek Waterway from deep water to head of harbor, 363.2 
feet wide to 750 feet from inner end, thence 18 feet deep 
for inner 750 feet; Squalicum Creek Waterway, including 
dredging an entrance channel 200 feet wide and 26 feet 
deep from deep water in the bay to main pierhead line, 
and maintenance of southerly half and westerly end of 
Squalicum Creek basin to 26 feet deep, provided that no 
dredging can be done within 75 feet of wharves, piers, or 
similar structures; and small-boat basin adjacent to 
Squalicum Creek Waterway by construction and 
maintenance of two sections of rubblemound breakwater 
with combined length of 5,400 feet, including 
maintenance of minimum depths of 12 feet in entrance 
to basin. Plane of reference is mean lower low water. 
Range between mean lower low water and mean higher 
high water is 8.6 feet. Extreme range is about 16 feet. 
Project was completed in February 1961. (For further 
details see Annual Report for 1961. For details relating to 
previous project see page 797 of Annual Report for 1907.) 
Local cooperation. Fully complied with. Requirements 
are described in full on page 38-2 of FY 1980 
Annual Report. 
Terminal facilities. Of the forty wharves and piers 
in Bellingham Harbor, 9 are on Whatcom Creek Waterway; 
3 on Squalicum Creek Waterway; 3 on I&J Street 
Waterway; and 9 on Bellingham Bay. Two wharves on 
Whatcom Creek Waterway serve general cargo terminals. 
One is publicly owned and operated and is suitable 
for use by ocean-going vessels; the other one is privately 
owned and operated. There is one publicly owned terminal 
and small-boat harbor with 11 wharves handling 
private craft and fishing boats. (See Port Series No. 37 - 
Ports of Everett, Bellingham, Port Angeles, and Anacortes, 
WA, revised 1987.) 
Operations during fiscal year. Maintenance, hired 
labor: Conducted channel condition surveys. Puget 
Sound Dredged Disposal Analysis study costs resulted 
in an expenditure of $160,000. 
3. EDMONDS HARBOR, WA 
Location. On easterly shore of Puget Sound in 
northwestern Washington, about 9 miles north of Seattle 
and immediately north of Edward's Point. (See Coast 
and Geodetic Survey Chart 6445.) 
Existing Project. Maintenance of a rubblestone 
breakwater and entrance channel of small-boat harbor. 
Project consists of a rubblemound breakwater about 
1,850 feet long with a top elevation of 18.5 feet, extending 
along southerly and westerly sides of basin; an entrance 
channel 13 feet deep and about 610 feet long, with a 
minimum width of 65 feet between deep water in the 
Sound and the basin; and the necessary navigation 
lights. Project was constructed by local interests and 
completed in April 1962. 
Local cooperation. Fully complied with. Requirements 
are described in full on page 1601 of FY 1966 
Annual Report. 
Terminal facilities. Two wharves and 4 pleasure 
craft handling facilities at Edmonds Harbor. One wharf 
is publicly owned and operated as a ferry terminal, the 
other, privately owned, is a gravel-unloading facility. 
There is also a Port-operated and-owned small-boat 
basin. These facilities, with exception of the small-boat 
basin, are considered adequate for existing commerce. 
Operations during fiscal year. Maintenance, hired 
labor: Conducted channel condition surveys. 
38-2

SEATTLE, WASHINGTON DISTRICT 
Maintenance, contract: A contract was awarded in 
September 1986, for repair of the Federally-maintained 
south rubblestone breakwater. Placement of 10,629 tons 
of armor rock was completed in November 1986, at a 
contract cost of $181,778. 
4. EVERETT HARBOR AND SNOHOMISH 
RIVER, WA 
Location. On Port Gardner Bay, at northern end of 
Possession Sound, an arm of Puget Sound at Everett, in 
northwestern Washington; and Snohomish River for 6.3 
miles above mouth. (See NOAA Survey Chart 18443.) 
Existing project. Training dike extending from a 
point opposite 23d Street northward 12,550 feet to outlet 
of Snohomish River, with spur dike extending 400 feet to 
pierhead line from north end of main dike; spur dike 
extending 1,410 feet westward from Preston Point; removal 
of a section of training dike north of Snohomish 
River outlet; channel 150 to 425 feet wide and 15 feet deep 
from deep water in Port Gardner Bay to 14th Street dock; 
thence a settling basin 700 feet wide, 1,200 feet long, and 
20 feet deep, thence a channel 150 feet wide and 8 feet 
deep upriver to head of Steamboat Slough, a total distance 
of about 6.3 miles; settling basin within upper 
channel reach about 1 mile long with a capacity of 1 
million cubic yards and maintaining East Waterway to 
30 feet deep. The 1968 modification included raising the 
southerly 4,100 feet of existing training dike, extending 
the training dike 1,500 feet farther south, and constructing 
a breakwater along the south and west sides of the 
existing small boat basin. Plane of reference is mean 
lower low water. Range between mean lower low water 
and mean higher high water is 11.1 feet. Extreme tidal 
range is about 19 feet. The boat basin breakwater has 
been deleted at the request of the local sponsor, and the 
remainder of the 1968 modification has been deferred 
indefinitely. Project was completed in April 1963, excluding 
the deleted and deferred portions. (For further 
details, see page 1683 of Annual Report for 1963. For 
details relating to previous projects, see page 704 of 
Annual Report for 1905, page 2005 of Annual Report for 
1915, and page 1883 of Annual Report for 1938.) 
Local cooperation. Fully complied with. Requirements 
are described in full on page 38-3 of FY 1981 
Annual Report. 
Terminal facilities. There are 42 piers and wharves 
in the Port of Everett, 17 in Port Gardner and 25 on the 
Snohomish River. These include: 19 publicly owned terminals 
with 4 berths handling ocean-going vessels and 1 
publicly owned terminal and small-boat basin handling 
fishing and pleasure craft. (See Port Series No. 37- Ports 
of Everett, Bellingham, Port Angeles and Anacortes, 
WA, revised 1987.) 
Operations during fiscal year. Maintenance, hired 
labor: Channel condition surveys were conducted 
throughout the year. Puget Sound Dredged Disposal 
Analysis study costs resulted in an expenditure of 
$20,000. 
Maintenance, contract: A maintenance dredging contract 
for the Upper Snohomish River channel and settling 
basin was completed in December 1986, at a cost of 
$498,350 with 181,582 cubic yards of material being 
removed. 
5. GRAYS HARBOR AND CHEHALIS RIVER, WA 
Location. Harbor lies at mouth of Chehalis River, in 
southwestern part of Washington, 45 miles north of 
entrance to Columbia River. Inner portion comprises 
two main channels, the south and the north, connecting 
harbor proper with Chehalis River at Aberdeen. Chehalis 
River rises in southwestern part of Washington about 
40 miles east of Pacific Ocean, flows generally northwesterly 
and empties into eastern part of Grays Harbor. (See 
NOAA Survey Chart 18502.) 
Existing project. Provides for an entrance channel 
across the bar 600 feet wide and 30 feet deep, to be 
secured by a south jetty 13,734 feet long and a north jetty 
17,200 feet long, both at an elevation of 16 feet, and by 
dredging; maintenance of channel 30 feet deep and 350 
feet wide from deep water in Grays Harbor 14 miles to 
Cow Point; thence 30 feet deep and 200 feet wide, suitably 
widened at bends, to a point 13,700 feet upstream from 
Union Pacific Railroad bridge at Aberdeen, a distance of 
4.125 miles; a turning basin 30 feet deep, 550 feet wide, 
and 1,000 feet long at upstream end of 30-foot channel 
near Cosmopolis; a channel 14 feet deep and 100 feet 
wide in South Bay to Bay City; three breakwaters at, and 
maintenance of entrance channel to Westhaven Cove; 
and protection of Point Chehalis for an exposed length of 
about 7,500 feet. Plane of reference is mean lower low 
water. Tidal range between mean lower low water and 
mean higher high water is 8.9 feet at Point Chehalis, 10.1 
feet at Aberdeen, and 8.1 feet at Montesano. Extreme 
range is 17.5 feet at Point Chehalis, 17.8 feet at Aberdeen, 
and 23.8 feet at Montesano (river flood of 1935). 
Project was completed in March 1965 excluding deferred 
and inactive portions. Rehabilitation of 4,000 feet of the 
south jetty was completed in October 1966. (For further 
details, see Annual Report for 1967. For details relating 
to previous projects, see pages 2002-03 of Annual Report 
for 1915 and page 1863 of Annual Report for 1938.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 23 waterfront facilities 
(piers, wharves, and docks), exclusive of those available 
to recreational craft, at Grays Harbor, of which five 
are publicly owned. In foreign and domestic trade they 
serve various purposes which include the receipt and/or 
shipment of: logs and lumber, woodchips, conventional 
and containerized general cargo, seafood and fishing 
supplies, sand and gravel, and construction materials. 
Other uses include: mooring and icing fishing boats, 
mooring small vessels for outfitting and repair, and 
mooring company-owned tugs. Those piers operated by 
the U.S. Coast Guard moor government-owned vessels. 
(See Port Series No. 35, revised 1983.) 
Operations during fiscal year. Maintenance, hired 
labor: Channel condition surveys were conducted 
throughout the year. The Corps hopper dredge Yaquina 
accomplished dredging in South Reach, Crossover, and 
North Channels in October/November 1986, and in 
July/August 1987, removing 92,400 cubic yards of material 
at a cost of $633,800. 
Maintenance, contract: Maintenance dredging of the 
38-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
inner and outer harbors was completed in June 1987 at a 
cost of $1,916,900 with 1,411,231 cubic yards of material 
being removed. Approximately 630 lineal feet of revetment 
was rehabilitated, using stockpiled rock, at Point 
Chehalis, WA, at a cost of $106,760. 
6. KENMORE NAVIGATION CHANNEL, WA 
Location. The Kenmore Navigation Channel lies at 
the northern end of Lake Washington adjacent to the 
Sammamish River. Kenmore, an unincorporated industrial 
and business center in King County just north of 
Seattle, WA, encompasses the lands to the north of the 
channel. (See NOAA Survey Chart 18447.) 
Existing project. The construction of a navigation 
channel to serve the Kenmore industrial area, King 
County, WA, involves a 15-foot-deep channel which 
would consist of a 100-foot-wide inner channel 900 feet 
long, an 800-foot-long transition channel with a 240 30- 
foot bend and a maximum width of 190 feet, and a 
120-foot-wide outer channel 1,200 feet long. The project 
also consists of the installation of a goose nesting area 
on property adjacent to the new channel as mitigation 
for the removal of goose nests during construction. Project 
was completed in March 1981. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Maintenance, hired 
labor: Puget Sound Dredged Disposal Analysis study 
costs resulted in an expenditure of $30,000. 
Maintenance, contract: A maintenance dredging 
contract was completed in February 1987, at a cost of 
$254,906 with 24,106 cubic yards of material being 
removed. 
7. LAKE CROCKETT, WA 
Location. The harbor is on the west side of Whidbey 
Island, about 35 nautical miles north of Seattle, WA. The 
lake lies parallel to Admiralty Bay and is separated from 
it by a narrow strip of gravel beach. (See NOAA Survey 
Chart 18441.) 
Existing project. Provides for a basin in Lake 
Crockett with an area of about 6 acres and 18 feet deep at 
mean lower low water, connected with Admiralty Bay 
by a channel of the same depth and 150 feet wide, protected 
by a breakwater. The diurnal tidal range in Admiralty 
Bay is 8.4 feet and the extreme range is about 16.5 
feet. Project was completed in January 1948. (For further 
details, see Annual Report for 1948.) Recreational 
facilities at project under cost-sharing agreement with 
Washington State Parks and Recreation Commission 
include the following construction and improvements: 
Construct a 35-unit camping loop and restroom, new 
-. boat ramp handling facility, breakwater, a restroom in 
the day-use area and porto-potti dumps for boats; and 
expand day-use facility and add riprap at the construction 
site. 
Local cooperation. None required. 
Terminal facilities. One publicly owned and privately 
owned passenger and automobile ferry landing 
within the dredged basin is open for public use, and is 
adequate for existing commercial traffic. The basin 
contains two publicly owned boat ramps open for public 
use. The ramps are adequate for recreational craft. 
Operations during fiscal year. Maintenance, hired 
labor: Channel condition surveys conducted. 
Maintenance, contract: A contract to dredge approximately 
24,000 cubic yards was awarded in August 1987, 
and is 76% complete. Material will be used for beach feed 
to protect the Federal breakwater. 
8. LAKE WASHINGTON SHIP CANAL, WA 
Location. Entirely within city of Seattle and extends 
from Puget Sound through Shilshole Bay, Salmon Bay, 
Lake Union, Portage Bay, and Union Bay to deep water 
in Lake Washington. (See NOAA Survey Chart 18447.) 
Existing project. Provides for a double lock and 
fixed dam with gated spillway and necessary accessory 
works, including fishladder, at the Narrows at entrance 
to Salmon Bay, about 1.25 miles from deep water in 
Puget Sound; for a channel 34 feet deep and 300 feet wide 
from Puget Sound to Burlington Northern Railway 
bridge, about 5,500 feet, with a passing basin 34 feet deep 
and log basin 8 feet deep at turn below railway bridge; 
then 34 feet deep and 150 feet to 200 feet wide to locks, 
about 900 feet; and a guide pier 600 feet long; for revetment 
of canal banks between locks and Lake Union and 
between Lakes Union and Washington; and for a channel 
30 feet deep with a width of 100 feet from locks to 
Lake Union, 200 feet thence to Portage Cut, 100 feet 
through Portage Cut, and thence 200 feet wide through 
Union Bay to' Lake Washington. Section included in 
project is about 10 miles long. Plane of reference is mean 
lower low water. Extreme tidal range is 19.3 feet. Range 
between mean lower low water and mean higher high 
water is 11.3 feet, and between mean lower low water 
and extreme low water is 4.6 feet. Ordinary fluctuation 
in upper pool is about 22 inches; extreme fluctuation has 
been 3.6 feet. Principal features of double lock and dam 
(structures are at Seattle, WA) are set forth in Table 38-H. 
Project was completed in 1934. (For further details, see 
Annual Report for 1935. For details relating to previous 
projects, see page 2003 of Annual Report for 1915, and 
page 1880 of Annual Report for 1938.) 
Local cooperation. Fully complied with. 
Terminal facilities. The eight waterfront facilities 
at Lake Washington Ship Canal are used for fuel oil, 
seafood, marine repair, drydocking, outfitting, mooring 
fishing vessels and repairs to the locks' equipment. 
Project is a part of Seattle Harbor's inner harbor. (See 
Port Series No. 36, revised 1983.) 
Operations during fiscal year. Maintenance, hired 
labor: Locks were operated and maintained all year, 
passing 20,000 commercial and 65,000 pleasure vessels, 
and 2,200,000 tons of commerce. Fishladder passed 
500,000 fish and there were more than 1,000,000 project 
visitors. 
Maintenance, contract: The following contracts were 
awarded in late September: Equipment Storage Building, 
Spillway Gate Seal Replacement, Repair of Saltwater 
Barrier, and Upgrade Water Distribution and Fire 
38-4

SEATTLE, WASHINGTON DISTRICT 
Protection Systems. 
Major Rehabilitation. New work; contract: Contract 
for construction of a new Emergency Closure System 
and rehabilitation of the downstream guard gate is 
complete. 
9. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION 
Navigation activities pursuant to Section 107, 
Public Law 86-645 (preauthorization). 
Fiscal year costs for preauthorization studies were: 
Gooseberry Point Small Boat Harbor, Hale Passage, 
WA, $35,753; Oak Harbor Marina, WA, $159 (Unfavorable 
Report); Sandy Point Harbor, Whatcom County, WA, 
$139; Coupeville, Whidbey Island, WA, $2,907; Fisherman 
Bay, Lopez Island, WA, $7,473. 
Aquatic plant control (Section 302, Public Law 
89-298): 
The program consists of control measures for selected 
water bodies currently infested with Eurasian watermilfoil 
and measures to prevent its spread into uninfested 
waters. Operations under the cost-share program 
included mechanical harvesting of 84 acres, maintaining 
5 acres of fiberglass bottom screens, adding 0.75 
acres of fiberglass bottom screens, and rototilling 12 
acres at Lake Washington, Lake Union and Lake Sammamish, 
WA; aerial photo-mapping and rototilling 
approximately 30 acres at Osoyoos Lake, WA; and rototilling 
101 acres at Pend Oreille River, WA. The FY 1987 
work also included treatment effectiveness and carryover 
studies, cooperation with the University of 
Washington on a Grass Carp study, aquatic plant surveys, 
and public information efforts. Total costs for fiscal 
year were $478,156. 
10. OLYMPIA HARBOR, WA 
Location. Near southern end of Puget Sound at head 
of Budd Inlet, about 45 miles southwest of Tacoma. (See 
Coast and Geodetic Survey Chart 6462.) 
Existing project. Provides for a channel between 
deep water in Budd Inlet and port terminal, 30 feet deep 
at mean lower low water and 500 feet wide, with suitable 
additional width at bend, and a turning basin adjacent 
to port terminal 30 feet deep, 3,350 feet long, and 500 to 
960 feet wide. Extreme tidal range is 22.5 feet. Range 
between mean lower low water and mean higher high 
water is 14.4 feet. Existing project was completed in 
1939. Entrance channel and turning basin authorized 
by 1945 River and Harbor Act have been deferred. (For 
details relating to previous projects, see page 1369 of 
Annual Report for 1934 and page 1873 of Annual Report 
of 1938.) 
Local cooperation. Modification authorized by 
River and Harbor Act of March 2, 1945, requires that 
local interests furnish suitably bulkheaded areas for retention 
of dredged materials, when and as required. The 
Port of Olympia advised on January 25, 1949, that it 
could not comply with requirements at that time, but 
would do so on earliest possible date. 
Terminal facilities. Five port facilities are located in 
Olympia at Budd Inlet, exclusive of the numerous waterfront 
facilities in the ports used by recreational craft. 
The industrial docks are used for conventional general 
cargo, logs, timber products and miscellaneous mooring. 
(See Port Series No. 35, revised 1983.) 
Operations during fiscal year. Maintenance, hired 
labor: Annual sub-surface dive inspection of concrete 
floating breakwater was performed. Monitored the Port 
of Olympia operations of the dissolved oxygen and aeration 
systems. Puget Sound Dredged Disposal Analysis 
study costs resulted in an expenditure of $103,000. 
11. PORT TOWNSEND, WA 
Location. In northwestern Washington, about 40 
miles northwest of Seattle, on Olympic Peninsula, at 
demarcation point between Strait of Juan de Fuca and 
Admiralty Inlet which forms northerly part of Puget 
Sound. (See Coast and Geodetic Survey Chart 6405.) 
Existing project. Mooring basin and breakwater, 
basin with an area of 12.5 acres and depths of 10 and 12 
feet below mean lower low water in inner and outer 
sections, respectively, and a gravel and rockfill breakwater 
1,946 feet long. Range between mean lower low 
water and mean higher high water at Port Townsend is 
8.8 feet. Extreme range is about 16.5 feet. Project was 
completed in November 1964. (For further details, see 
Annual Report for 1965.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 11 piers and wharves 
in the harbor. One, publicly owned and operated, is 
available for public use and one, privately owned and 
operated, serves as a general cargo terminal. The 
remaining nine are used for various industrial purposes. 
Of these, one is used for ocean-going vessels and one is 
used as a railroad car ferry terminal. In addition, there 
are two protected basins, publicly owned and operated, 
for commercial fishing and pleasure craft. These facilities 
are considered adequate for existing commerce. 
Operations during fiscal year. Maintenance, hired 
labor: Puget Sound Dredged Disposal Analysis study 
costs resulted in an expenditure of $52,000. 
12. PROJECT CONDITION SURVEYS 
Preliminary and detailed surveys to determine navigation 
conditions at boat basins, small navigation projects, 
channels, and tributaries of major rivers not 
within major project boundaries. Soundings and visual 
inspections in subject areas are conducted in order to 
evaluate shoaling conditions. Channel centerline 
markers are inspected for visibility and proper operation 
in applicable areas frequented by boating traffic consisting 
mostly of recreationalists. In addition, all subject 
areas arp inspected to insure that they are clean of snags 
and obstructions. Total costs for fiscal year were 
$301,856. 
13. PUGET SOUND AND ITS TRIBUTARY 
WATERS, WA 
Location. Puget Sound is in the western part of 
Washington. Cities of Seattle, Tacoma, Olympia, Eve- 
38-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
rett, Bellingham, and many small towns are on its bays 
and inlets. (See NOAA Survey Charts 18400, 18441 and 
18448.) 
Existing project. Maintenance of Puget Sound and 
its tributary waters by snagging and dredging; and 
removal, in cooperation with city of Seattle, of floating 
debris from the Seattle Harbor area. Work consists of 
collecting large pieces of drift, waterlogged pilings, logs 
and other debris, considered hazardous to navigation 
from Puget Sound and Federally authorized channels. 
(For details relating to previous projects, see page 2003 of 
Annual Report for 1915 and page 1869 of Annual Report 
for 1938.) 
Local cooperation. None required. City of Seattle is 
cooperating in a program for control of floating debris in 
Seattle Harbor. 
Terminal facilities. Terminal facilities at numerous 
localities on Puget Sound and its tributary waters are, in 
general, considered adequate for existing commerce. 
Operations during fiscal year. Maintenance, hired 
labor: The debris vessel Puget operated continuously 
throughout Puget Sound and its tributary waters and 
removed approximately 2,545 tons of floating debris and 
hazards to navigation. Debris was disposed of locally or 
loaded aboard barges and disposed of by contract. 
Snagging operations were accomplished at Blaine Harbor, 
Bellingham Harbor, Swinomish Channel, Skagit 
River, Everett Harbor, Snohomish River (upstream to 
town of Snohomish), Lake Washington Ship Canal, 
Lake Washington, Tacoma Harbor, Olympia Harbor, 
Duwamish River, and Elliott Bay. 
Maintenance, contract: 2,925 tons of harbor debris 
were disposed of at a cost of $72,891. Current contractor is 
recycling some of the debris and placing the remainder 
in a landfill. 
14. QUILLAYUTE RIVER, WA 
Location. River is formed by junction of Soleduck 
and Bogachiel Rivers, in northwestern Washington, and 
flows westerly 5 miles to Pacific Ocean at La Push, about 
30 miles south of Cape Flattery. (See NOAA Survey 
Chart 18480.) 
Existing project. Provides for: (a) Jetty 15 feet high on 
easterly side of river mouth, and a dike on westerly side, 
with a view of stabilizing entrance; (b) channel 10 feet 
deep and 100 feet wide extending 2,000 feet upstream 
from deep water; (c) basin 10 feet deep, 300 to 425 feet 
wide, and 2,400 feet long upstream of channel; and (d) 
maintenance of an ocean spit. Plane of reference is mean 
lower low water. Range between mean lower low water 
and mean higher high water at La Push is 8.3 feet. 
Extreme range is about 15 feet. The spit was nourished 
in conjunction with channel dredging contracts completed 
in 1973 and in 1977. The spit was rehabilitated 
with quarry rock in 1974, in 1979-80, and in 1982. In 
addition, a 500-foot breakwater section paralleling the 
channel and extending the spit was constructed. Project 
was completed in February 1960; however, the channel 
upstream of the boat basin has been classified as inactive. 
(For further details, see Annual Report for 1963.) 
Local cooperation. Complied with except that the 
requirement to provide a public landing open to all on 
equal terms in the boat basin was not complied with 
between May and July 1981, due to the closure of the 
Quileute Indian Reservation to the landing of salmon by 
sport and charter fishermen. Project sponsorship was 
transferred from the Port of Port Angeles to the Quileute 
Tribe Port Authority in 1983. 
Terminal facilities. There are 6 privately-owned 
docks at La Push, near the mouth of the Quillayute 
River. In addition, there is a protected boat basin owned 
by the Quileute Tribe Port Authority which is used by 
fishing boats, pleasure craft, and the Coast Guard, 
which has a separate pier. 
Operations during fiscal year. Maintenance, hired 
labor: Condition surveys were made of the river channel 
during the year. 
Maintenance, contract: The river channel and spot 
shoals in the boat basin were dredged in February/- 
March 1987, removing 83,766 cubic yards of material at 
a cost of $369,045. 
15. SEATTLE HARBOR, WA 
Location. Harbor at Seattle, WA, includes all waterways 
within city limits. Chief anchorage basin is Elliott 
Bay, an arm of Puget Sound. (See NOAA Survey Chart 
18450.) 
Existing project. Maintenance of East and West 
Waterways, 34 feet deep and 750 feet wide for 6,500 and 
5,200 feet, respectively, from pierhead line in Elliott Bay; 
maintenance of East Waterway between upper end of 
750-foot section and Spokane Street, 34 feet deep, 700 feet 
long, and 400 feet wide, and a turning basin, including 
head of East Waterway at junction of waterways south 
of Chicago, Milwaukee, St. Paul & Pacific Railroad 
Bridge, to 30 feet deep, after these sections of waterway 
are dredged by local interests to full project dimensions; 
and dredging Duwamish Waterway 200 feet wide and 30 
feet deep between West Waterway and First Avenue 
South, 150 by 20 feet between First and Eighth Avenues 
South, thence 150 feet by 15 feet to a point about 1.4 miles 
above 14th Avenue South Bridge, with turning basin 600 
by 350 feet and 20 feet deep just south of First Avenue 
South Bridge, and turning basin 500 by 250 feet and 15 
feet deep, and settling basin of about 100,000 cubic yardscapacity 
at upper end of waterway, a distance of 5.12 
miles. Total length of waterways included in project is 
about 7.5 miles. Plane of reference is mean lower low 
water. Range between mean lower low water and mean 
higher high water is 11.3 feet. Extreme tidal range is 19.3 
feet. Project was completed in 1931, excluding the settling 
basin at upstream end which is classified inactive 
and East Waterway above the 750-foot section. (For 
further details, see Annual Report for 1932.) 
Local cooperation. Fully complied with. Local 
sponsor has no maintenance responsibility. 
Terminal facilities. There are 196 piers, wharves, 
and docks located on the inner and outer harbors at 
38-6

SEATTLE, WASHINGTON DISTRICT 
Seattle, WA. Salmon Bay, Lake Union, Portage Bay and 
Lake Washington form the inner harbor; Elliott Bay and 
East, West and Duwamish Waterways form the outer 
harbor. (Lake Washington Ship Canal, a part of the 
inner harbor, is a separate project in this report.) These 
terminals serve a variety of purposes which include 
cargo handling, bunkering vessels, ferry service (vehicular, 
passenger and rail car), marine repair/outfitting/ 
drydocking/conversion, shipbuilding, handling 
supplies and equipment, and mooring company-owned 
equipment, excursion vessels, fire boats, fishing vessels, 
government equipment, harbor craft/tugs, and oceanographic 
research vessels. The numerous waterfront 
facilities in the port used exclusively by recreational 
craft are not included. (See Port Series No. 36, revised 
1983.) 
Operations during fiscal year. Maintenance, hired 
labor: Condition surveys made of channels. Puget 
Sound Dredged Disposal Analysis study costs resulted 
in an expenditure of $207,440. 
Maintenance, contract: The annual maintenance 
dredging of the Duwamish Waterway was completed in 
March 1987, with the removal of 80,200 cubic yards at a 
cost of $176,400. 
16. SWINOMISH CHANNEL, WA 
Location. An inland passage, 11 miles long, between 
Saratoga Passage and Padilla Bay, in northwestern 
part of Washington, about 60 miles north of Seattle. (See 
NOAA Survey Charts 18400, 18427 and 18421.) 
Existing project. A channel 100 feet wide and 12 feet 
deep for 11 miles from deep water in Saratoga Passage to 
deep water in Padilla Bay, by dredging and dike construction 
where necessary; and removal of protecting 
rocky points of McGlinn and Fidalgo Islands obstructing 
navigation at "Hole-in-the-Wall". Plane of reference 
is mean lower low water. Range between mean lower low 
water and mean higher high water is 11.5 feet at south 
end of channel, 8.4 feet at north end, and 10 feet at La 
Conner. Extreme tidal range is about 19.5 feet at south 
end of channel and about 16 feet at north end. Project 
was completed in March 1965. (For further details, see 
Annual Report for 1965.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 18 wharves, docks, 
and piers on Swinomish Channel, all but 3 of which are 
privately owned. Of these, l is used for handling general 
cargo, 5 are used exclusively for moorage, unloading, 
and servicing of fishing vessels; 2 are used for handling 
petroleum products; 3 facilities are used for log dumps; 
and 2 for handling non-metallic minerals. Three publicly 
owned facilities for launching, mooring, and servicing 
small craft are within the city limits of La Conner. 
Operations during fiscal year. Maintenance, hired 
labor: Condition surveys were made of various reaches 
of the channel. Puget Sound Dredged Disposal Analysis 
study costs resulted in an expenditure of $121,000. 
Maintenance, contract: A maintenance dredging contract 
for clamshell dredging with open-water disposal 
was completed in February 1987, at a cost of $369,111 
with 156,141 cubic yards of material being removed. The 
Corps removed a deteriorated timber pile structure on 
Swinomish Channel with the debris vessel Puget and 
disposed of the demolition materials through the 
PS&TW harbor debris disposal service contract. 
17. TACOMA HARBOR, WA 
Location. Harbor includes Commencement Bay and 
tributary waterways at Tacoma, in northwestern 
Washington. (See NOAA Survey Chart 18453.) 
Existing project. Provides for: (a) Channel in City 
Waterway 500 feet wide and 29 feet deep from deep water 
in Commencement Bay to 11th Street Bridge, 500 feet 
wide and 22 feet deep to 14th Street Bridge, and varying 
from 500 to 250 feet wide and 19 feet deep from 14th 
Street Bridge to end of this waterway, a total length of 
8,500 feet; (b) channel in Hylebos Waterway 30 feet deep, 
3.1 miles long, and 200 feet wide except where width is 
increased to 250 feet at the bend below East 11th Street, 
to 300 feet at Lincoln Avenue bend, and to 510 feet and 
770 feet, respectively, at the channel widening above 
Lincoln Avenue and the turning basin at the head of the 
waterway; (c) construction of two training walls, each 
about 700 feet long at mouth of Puyallup River; and (d) 
channel in Blair Waterway 2.6 miles long, including a 
portion seaward of East 11th Street, 650 feet wide and 30 
feet deep over southerly 350 feet, and 35 feet deep over 
northerly 300 feet; and remaining portion, 35 feet deep 
and 150 feet wide at East 11th Street, 600 feet wide 
between East 11th Street and Lincoln Avenue, and 300 
feet wide between Lincoln Avenue and a 1,200-foot wide 
turning basin at head of waterway. Plane of reference is 
mean lower low water. Range between mean lower low 
water and mean higher high water is 11.8 feet. Extreme 
tidal range is about 20 feet. Project was completed in 
December 1966. (For further details, see Annual Report 
for 1967. For details relating to previous projects, see 
pages 1372 to 1376 of Annual Report for 1934 and page 
1875 of Annual Report for 1938 for Puyallup Waterway, 
and page 1702 of Annual Report of 1944 and page 1502 of 
Annual Report for 1954 for Blair (formerly Wapato and 
Port Industrial) Waterway.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 81 terminal facilities, 
exclusive of those available to recreational craft, located 
in Tacoma Harbor which is comprised of Commencement 
Bay and its many waterways. These facilities 
serve a variety of purposes which includes cargo handling, 
fueling small vessels, ferry traffic, marine repair, 
conversion/outfitting, dry-docking, mooring, bunkering, 
ship-building, and shipbreaking. (See Port Series 
No. 35, revised 1983.) 
Operations during fiscal year. Maintenance, hired 
labor: Puget Sound Dredged Disposal Analysis study 
costs resulted in an expenditure of $26,000. 
18. WATERWAY CONNECTING PORT 
TOWNSEND AND OAK BAY, WA 
Location. Canal connects two bays which are arms 
38-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
of Admiralty Inlet on west side of Puget Sound, in northwestern 
part of Washington, about 40 miles north of 
Seattle. (See U.S. Coast and Geodetic Survey Chart No. 
6405.) 
Existing project. Provides for a canal 15 feet deep, 75 
feet wide on the bottom, and about 4,800 feet long, and 
for construction of jetties to protect channel at southern 
or Oak Bay end, and a bulkhead for retention of dredged 
material. Plane of reference is mean lower low water. 
Range between mean lower low water and mean higher 
high water is 8.3 feet in Port Townsend Bay and 9.4 feet 
in Oak Bay. Extreme tidal range is 16 feet. 
Local cooperation. Fully complied with. 
Terminal facilities. None directly served by the 
canal. 
Operations during fiscal year. Maintenance, hired 
labor: Puget Sound Dredged Disposal Analysis study 
costs resulted in an expenditure of $52,000. 
19. WILLAPA RIVER AND HARBOR AND 
NASELLE RIVER, WA 
Location. Willapa Harbor consists of lower reaches 
of Willapa River and Bay, an inlet of Pacific Ocean 
about 30 miles north of mouth of Columbia River in 
Washington. Willapa River rises about 30 miles east of 
harbor, flows generally westerly, and empties into the 
bay. Naselle River enters the bay near its southerly end. 
(See NOAA Survey Chart 18504.) 
Existing project. Provides for: (a) channel over bar 
at mouth of Willapa Bay, 26 feet deep and at least 500 
feet wide; (b) channel 24 feet deep and 200 feet wide from 
deep water in Willapa Bay to foot of Ferry Street at 
South Bend, thence 300 feet wide to westerly end of 
narrows, thence 250 feet wide to forks of river at Raymond, 
including a cutoff channel 3,100 feet long at narrows 
and a closing dike at Mailboat Slough; (c) channel 
24 feet deep and 150 feet wide up south fork to deep basin 
above Cram lumber mill, and up north fork to 12th 
Street, with a turning basin 250 feet wide, 350 feet long, 
and 24 feet deep at latter point; (d) channel 10 feet deep 
and 40 feet wide from deep water in Palix River to Bay 
Center dock, with widening at shoreward end to provide 
a small mooring basin; (e) mooring basin 15 feet deep, 
340 feet wide, and 540 feet long adjacent to port wharf at 
Tokeland; (f) entrance channel at Nahcotta 10 feet deep 
and 200 feet wide, and mooring basin 10 feet deep, 500 
feet wide, and 1,150 feet long, protected by a rubblemound 
breakwater about 1,500 feet long; and (g) removal 
of snags, piles, and other obstructions in navigable 
channel of Naselle River between Naselle and mouth. 
Project includes about 26 miles of channel from entrance 
through Willapa River forks, 2,800 feet of Palix River- 
Bay Center channel, and 9 miles of Naselle River 
upstream of U.S. Highway 101 Bridge. Plane of reference 
is mean lower low water. Tidal range between mean 
lower low water and mean higher high water is 8.9 feet at 
Toke Point, 9.9 feet at Raymond, 8.9 feet at Bay Center, 
and 10.8 feet near Naselle. Extreme range is 18 feet at 
Toke Point, 19.3 feet at Raymond, 16 feet at Bay Center, 
and 18 feet near Naselle. Project was completed in 
November 1958. (For further details, see Annual Report 
for 1959. For details relating to previous projects, see 
page 968 of Annual Report for 1910, page 2001 of Annual 
Report for 1915, and page 1861 of Annual Report for 
1938.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 24 wharves on Willapa 
River and Harbor, including 5 in Willapa Bay, 4 in 
Bay Center, 12 in Raymond and South Bend, and 1 in 
Tokeland. Two of the wharves at Raymond and South 
Bend are suitable for use by ocean-going vessels; one of 
these is publicly owned and operated as a general cargo 
terminal, and one is located at a sawmill. The other 
wharves, including 3 that are publicly owned and operated, 
are used by shallow-draft vessels. These facilities 
are considered adequate for existing commerce. 
Operations during fiscal year. Maintenance, hired 
labor: Condition surveys were made of various segments 
of the project. Conducted ocean disposal study. 
Maintenance, contract: Tokeland entrance channel 
maintenance dredging was completed in July 1987, at a 
cost of $77,236 with 27,749 cubic yards of material being 
removed. 
Beach Erosion 
20. BEACH EROSION WORK UNDER SPECIAL 
AUTHORIZATION 
Beach erosion control activities pursuant to Section 
103, Public Law 84-874 (preauthorization). 
Fiscal year costs for Lincoln Park Beach, Seattle, WA, 
were $1,464. 
Flood Control 
21. ELWHA KLALLAM RESERVATION, 
ELWHA, WA 
Location. Within the Elwha River basin on the 
Olympic peninsula of Washington State, and approximately 
6 miles west of the city of Port Angeles in Clallam 
County. 
Existing project. A setback levee, 7,640 feet long, 
averaging 8 feet high with a 12-foot top width, to reduce 
flood damages along the lower Elwha River within the 
Klallam Tribal Reservation. The landward levee slope 
would be covered with soil and the riverward slope 
would be protected with quarry spalls. Both slopes would 
be planted with native grasses. Top of levee would be 
surfaced with gravel to provide a suitable road for 
inspection and maintenance. Interior runoff reaching 
the levee would be drained through gated culverts and a 
2,000-foot-long drainage ditch which would parallel the 
downstreanportion of the levee. Several ramps would 
be built across the levee to provide access to property and 
the existing hatchery fish holding pond would be relocated 
behind the levee. Estimated cost of the project is 
$1,196,000 ($897,000 Federal; $299,000 non-Federal). 
Expected completion date is 1988. 
Local cooperation. Under current cost sharing 
38-8

SEATTLE, WASHINGTON DISTRICT 
requirements, the local sponsor (Lower Elwha Klallam 
Tribe) will provide 25% of project cost. Local sponsor will 
also provide operation and maintenance of the completed 
project. 
Operations during fiscal year. New work, hired 
labor: Plans and specifications were initiated after completion 
of the Definite Project Report. 
22. FLOOD CONTROL WORK UNDER SPECIAL 
AUTHORIZATION 
Flood control activities pursuant to Section 14, Public 
Law 79-526 (preauthorization). 
Fiscal year costs for Sauk River, Skagit County, WA, 
were $5,312., 
23. HOWARD A. HANSON DAM, WA 
Location. Green River, in northwestern Washington, 
flows westerly for 40 miles to Auburn, thence northerly 
32 miles to its mouth in Elliott Bay at Seattle. Dam is at 
river mile 64, 6 miles southeast of Kanaskat, and 1 mile 
downstream from mouth of North Fork. (See Geological 
Survey topographic sheet, "Cedar Lake quadrangle, 
WA") 
Existing project. Rockfill dam about 235 feet high, 
with gated spillway having a concrete weir at elevation 
1176 feet above mean sea level and top of gates at elevation 
1206, creating a reservoir with capacity of 106,000 
acre-feet. Dam along crest is about 675 feet long. 
Improvement is designed to control flooding in Green 
River Valley to alleviate agricultural and urban flood 
damage, and make possible further expansion of Seattle 
industrial area. It also supplements Tacoma water 
supply which was included as a betterment. Project was 
completed in June 1963. (For further details, see Annual 
Report for 1963.) 
Local cooperation. Fully complied with. 
Operations during fiscal year. Maintenance, hired 
labor: Operation continued all year. Routine maintenance 
was accomplished on roads, gages, debris booms, 
turbidimeter, ditches, powerline, and other project features. 
The outlet works stilling basin was inspected. 
Work continued on water quality surveys, water storage 
studies, and channel capacity study. 
Maintenance, contract: Settlement of the fill for the 
relocated Burlington Northern Railway between stations 
10989 and 10991 was under continued surveillance. 
The deferred construction period has been extended to 
cover this area to observe effect of remedial work. 
(Improvements to the drainage system have apparently 
stabilized the railroad fill.) Generator set replacement 
and exploratory drilling contracts were completed. 
24. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Inspections are made of Federally constructed local 
flood protection projects which are maintainedby local 
interests; and agencies responsible for their operation 
and maintenance are advised of any needed repairs. 
During the fiscal year, inspections were made on Okanogan 
River at Omak and Oroville, Dungeness River at 
Sequim, Sammamish River, Shelton Creek, Stillaguamish 
River and Yakima River, all in Washington State; 
Coeur d'Alene, and St. Maries projects in Idaho. 
Streambank vegetation evaluations were made at Omak 
and Oroville and on the Green River in Washington. 40 
Section 14 bank protection projects in WA, ID and MT 
were inspected in conjunction with flood control projects. 
Fiscal year costs were $74,627. Costs to date have 
been $747,738. 
25. INSPEGCIONOFCOMPLETEDPL-99WORKS 
A levee inspection program was initiated this FY to 
determine new eligibility criteria for rehabilitation 
under PL84-99. Non-Federal levees in Whatcom County 
were contracted to a consulting firm. Approximately 50 
miles of non-Federal levees in the Snohomish River 
basin were evaluated by the Seattle District. Fiscal year 
costs were $72,083. Total costs to date have been 
$237,696. 
26. LITTLE QUILCENE RIVER, NEAR 
QUILCENE, WA 
Location. Project is located in Jefferson County, 1 
mile northeast of Quilcene, WA, in Mt. Walker Quadrangle 
SE 1/4 sec. 11, T. 27 N., R. 2W. 
Existing project. Approximately 200 lineal feet of 
riprap bank protection to prevent further erosion of 
Wildwood Road which is adjacent to the Little Quilcene 
River. Protection would consist of a riprap blanket 36" 
thick on a 1V to 1.5H slope and a 12-foot-wide, 4-footthick 
weighted riprap toe. Estimated cost of the project is 
$48,500 ($36,375 Federal; $12,125 non-Federal). Expected 
completion date is 1988. 
Local cooperation. Under current cost sharing 
requirements, the local sponsor (Jefferson County) will 
provide 25% of project cost. 
Operations during fiscal year. New work, hired 
labor: Plans and specifications were initiated. 
27. MUD MOUNTAIN DAM, WA 
Location. On White River, principal tributary of 
Puyallup River, near Mud Mountain, 28 miles above its 
confluence with Puyallup River, and 38 miles above 
mouth of Puyallup River. Dam is 6 miles southeast of 
Enumclaw, in northwestern Washington, and 38 miles 
east of Tacoma. (See Geological Survey topographic 
sheet "Cedar Lake quadrangle, Washington.") 
Existing project. Rockfill dam, 700 feet long at crest 
elevation, rises 425 feet above bedrock. Reservoir has 
storage capacity of about 106,000 acre-feet. Outlet works 
are in right abutment and permit controlled discharge of 
17,700 cubic feet per second through two concrete-lined 
tunnels with uncontrolled discharge over spillway having 
maximum capacity of T39,000 cubic feet per second. 
Improvement affords flood protection to White and 
Puyallup River Valleys and protects Tacoma industrial 
district in conjunction with Puyallup River project at 
Tacoma against floods about 50 percent greater than 
maximum discharge of record. Project was completed in 
June 1953, except for recreational facilities. (For further 
details, see Annual Report for 1953.) To date the Corps 
38-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
has constructed two vistas, a picnic area, and playground 
adjacent to the project office, a reservoir access 
point for hunters and fishermen, and a 1,760-foot trail 
leading to the lower vista area. 
Local cooperation: None required. 
Operations during fiscal year. Maintenance, hired 
labor: Project features were operated all year. Maintenance 
was accomplished on dam facilities, intake structure, 
gages, debris booms, power lines, roads, ditches, 
and fish facilities. Approximately 1,300 fish were transported 
from the fish collection facility. Engineering work 
continued on investigation and evaluation of a seepage 
problem in dam core. 
Dam Safety Assurance. New work, hired labor: A 
Feature Design Memorandum for correcting earthquake 
and debris blockage deficiencies in the intake tower was 
initiated in late FY 87. 
New work, contract: Completed construction of resident 
engineer's facility. 
Major Rehabilitation. New work, hired labor: 
Completed bid documents and prepared to award a contract 
for construction of a seepage control cutoff wall in 
the core of the dam. 
28. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Flood control storage space was available in Hungry 
Horse Reservoir, MT, Flathead Lake, MT (controlled by 
Kerr Dam), Grand Coulee Project, WA, Upper Baker and 
Ross Reservoirs, WA. Guidance forecasts were made 
during the flood control season, as required. No Lost 
Valley storage replacement was requested at Rocky 
Reach, Priest Rapids, and Wells Dams. Daily and/or 
hourly data were collected and tabulated as required to 
check compliance with operating criteria. Coordination 
necessary in preparation or revision of reservoir regulation 
manuals was carried on during the year with agencies 
responsible for the operation of these projects. Fiscal 
year costs were $201,661. 
29. SPOKANE RIVER, SPOKANE, WA 
Location. Project is located on the right bank of the 
Spokane River at approximately River Mile 82.6, in the 
city of Spokane, WA, in Spokane NE Quadrangle NE 1/4 
sec. 11, T. 25 N., R. 43 E. 
Existing project. Approximately 600 lineal feet of 
riprap bank protection to prevent further erosion of 
Upriver Drive, a city of Spokane arterial street. Protection 
would consist of a riprap blanket 36" thick on a 1V 
to 2H slope and a 15-foot-wide, 5-foot-thick weighted 
riprap toe. Estimated cost of the project is $166,500 
($124,875 Federal; $41,625 non-Federal). Expected completion 
date is November 30, 1987. 
Local cooperation. Under current cost sharing 
requirements, the local sponsor (City of Spokane) will 
provide 25% of project cost. 
Operations during fiscal year. New work, hired 
labor: Plans and specifications were initiated. 
30. STILLAGUAMISH RIVER, WA 
Location. Formed by confluence of its north and 
south forks at Arlington, in northwestern Washington, 
Stillaguamish River flows westerly 22 miles to Puget 
Sound, entering Port Susan through Hat Slough and 
South Pass, and Skagit Bay through West Pass. (See 
NOAA Survey Chart 18441, and Geological Survey 
quadrangles Stanwood, Marysville, and Stillaguamish, 
WA.) 
Existing project. Works to reduce bank erosion and 
channel changes on Stillaguamish River 15 miles 
between Arlington and head of Hat Slough, and on Cook 
Slough, 3 miles long, as follows: Revetment at 26 places 
on river and Cook Slough; concrete weir 275 feet long 
between steel-sheet-pile piers at head of Cook Slough to 
limit flow through slough; and two cutoff channels, each 
about 900 feet long, to eliminate sharp bends in Cook 
Slough. Tidal influence extends about 3 miles into 
improved section. Flood stages of 16 feet above low water 
at Cook Slough weir have been observed. Project was 
completed in July 1939. (For further details, see Annual 
Report for 1940.) 
Local cooperation. None required. 
Operations during fiscal year. Maintenance, hired 
labor: Utilized in-house labor and equipment to remove 
brush and trees on 38,000 linear feet. 
Maintenance, contract: Contracted to aid in removal 
of brush and trees. Contracted the repair of 5 segments 
with rock and gravel. 
31. TACOMA, PUYALLUP RIVER, WA 
Location. Puyallup River has its source in glaciers on 
western slopes of Mount Rainier, WA, flows northwesterly 
50 miles, and empties into Commencement Bay, an 
arm of Puget Sound, at Tacoma. Work covered by this 
project is on Puyallup River, within city limits of 
Tacoma. (See NOAA Survey Chart 18453.) 
Existing project. A channel with a capacity of 
50,000 cubic feet per second between East 11th Street 
Bridge and lower end of inter-county improvement, a 
distance of about 2.2 miles, by straightening channel, 
building levees, revetting channel and levees, and making 
necessary bridge changes. The 11th Street Bridge at 
lower end of project is 0.75 mile above mouth of Puyallup 
River. Diurnal tidal range at mouth of river is 11.8 feet 
and extreme range is 20 feet. Improvement was planned 
in conjunction with Mud Mountain Dam and affords 
protection against floods about 50 percent greater than 
maximum discharge of record. A real estate design 
memorandum, approved by Office of the Chief of Engineers 
on October 2, 1985, changed the project boundary 
to allow the Port of Tacoma to create a wetland adjacent 
to the project. This action resulted in the Corps acquiring 
approximately 2,450 lineal feet of setback levee in fee 
simple. Maintenance funds to cover the increased length 
of the project will be provided by the Port of Tacoma for 
the project life. Project was completed in May 1950. (For 
further details, see Annual Report for 1950.) 
Local cooperation. None required. 
38-10

SEATTLE, WASHINGTON DISTRICT 
Operations during fiscal year. Maintenance, hired 
labor: Utilized in-house labor and equipment to remove 
brush and trees on the entire project. 
Maintenance, contract: Contracted to aid in removal 
of brush and trees. 
32. WYNOOCHEE LAKE, WA 
Location. On Wynoochee River, a tributary of Chehalis 
River, about 28 miles north of Montesano, Grays 
Harbor County, WA. (See Geological Survey quadrangles, 
Grisdale, Wynoochee Valley, and Montesano.) 
Existing project. Provides for a concrete and earthfill 
dam, 177 feet high, and reservoir of 70,000 acre-feet of 
total storage for water supply, flood control, irrigation, 
and fish and wildlife. Upstream fish facilities were operational 
in the fall of 1970. The project was completed and 
became operational in December 1972. Installation of 
power-generating facilities was not authorized, pending 
a reexamination report by the Chief of Engineers. In 
February 1966, the Federal Power Commission asserted 
that power production as part of the Wynoochee project 
was not feasible at that time. (For further details, see 
Annual Report for 1972.) 
Local cooperation. Fully complied with. Requirements 
are described in full on page 38-12 of FY 1981 
Annual Report. 
Operations during fiscal year. Maintenance, hired 
labor: Project facilities were operated all year. Maintenance 
was accomplished on dam and fish facilities, 
roads, ditches, culverts, and visitors' facilities. The project 
tank truck hauled upstream migrant fish past the 
dam. 
Maintenance, contract: Contract for spillway gate 
repainting was completed. A contract in the amount of 
$62,146 for Generator Replacements was awarded in late 
September. 
Multiple-Purpose Projects, 
Including Power 
33. ALBENI FALLS DAM, ID 
Location. Dam is on Pend Oreille River about 25 
miles west of Sandpoint, in northern Idaho, and 50 miles 
northeast of Spokane, WA. Dam is 838 and 90 miles 
upstream from mouths of Columbia and Pend Oreille Rivers, 
respectively. (See Geological Survey topographic 
sheets, Sandpoint, ID, and Newport, WA.) 
Existing project. Provides flood control, hydroelectric 
power, and related water uses on Pend Oreille River 
as a part of the multiple-purposeplan for development of 
Columbia River Basin, including recreation development. 
At the dam, channel was formerly divided by an 
island and a low waterfall of about 7 feet. Dam is a gated, 
gravity-structure spillway in left channel and a powerhouse 
having an installation of 42,600 kilowatts in right 
channel, creating a reservoir with a usable storage 
capacity of 1,153,000 acre-feet. Project was completed in 
June 1957. (For further details, see Annual Report for 
1957.) Recreational facilities for public use have been 
provided at Albeni Cove, Priest River, Riley Creek, 
Johnson Creek, Trestle Creek, Strongs Island, and 
Springy Point. (Strongs Island was closed in FY 1982 to 
reduce O&M costs.) (Refer to Albeni Falls Master Plan 
dated June 1981 for further planned development.) 
Local cooperation. None required. 
Operations during fiscal year. Maintenance, hired 
labor: Reservoir was operated through its annual cycle 
of storage and release. Routine structural, mechanical, 
and electrical maintenance was performed on spillways, 
dam, powerhouse, and equipment. 
Maintenance, contract: Work continued on the boundary 
monumentation. 
34. CHIEF JOSEPH DAM, RUFUS WOODS 
LAKE, WA 
Location. On Columbia River in north central 
Washington, at river mile 545, just upstream from mouth 
of Foster Creek, 1.5 miles upstream from Town of 
Bridgeport. (Geological Survey topographic sheet 
Okanogan, WA, shows general locality.) 
Existing project. A concrete gravity structure which 
consists of a 19-gate spillway and a 27-unit powerhouse. 
The powerhouse has sixteen 88,274 kilowatt and eleven 
95,000 kilowatt generators with nameplate capacity of 
2,457,384 kilowatts. Additional work will be required to 
bring turbine efficiency for units 17-27 up to design 
standards. Uprating and plant modernization of units 
1-16, and other miscellaneous project work, is 
approximately 93 percent complete. Estimated cost of 
current construction project is $387,000,000. 
Local cooperation. None required. 
Operations during fiscal year. New work, hired 
labor: Continued real estate acquisition. 
New work, contract: Contracts were awarded for powerhouse 
roof repair, exhibits for the powerhouse public 
access facility, and project completion. 
Contracts continuing through the fiscal year included 
generator stator rewind, installation and fire protection, 
transformers, station service system, 15 kV circuit 
breakers, main unit excitation system, powerhouse 
shops, mobile sealing inspection unit, Bridgeport State 
Park (Phase II), relocation of public access in powerhouse, 
and wildlife mitigation: mule deer study and mitigation 
evaluation. Contracts completed during the fiscal 
year included turbine cavitation ($1,338,967) and 
governor system ($1,752,038). 
Maintenance, hired labor: Project was operated all 
year, and routine maintenance work was performed. 
Maintenance, contract: Contracts awarded during the 
fiscal year included: wildlife mitigation O&M in the 
amount of $90,000, intake trashrack sections in the 
amount of $96,000, and miscellaneous replacement parts 
orders. 
35. LIBBY DAM - LAKE KOOCANUSA, MT 
Location. On Kootenai River in Lincoln County, MT, 
about 17 miles upstream from Libby, and 219 miles 
upstream from confluence of Kootenai with Columbia 
38-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
River. (See Geological Survey topographic sheet, 
Thompson Lakes, MT.) 
Existing project. Provides storage for local flood 
control protection in Montana and Idaho, and main 
stem flood control in Lower Columbia River, hydroelectric 
power generation at-site and at downstream plants 
through storage release. Project will be operated as a 
unit of comprehensive system for improvement of 
Columbia River Basin for flood control, navigation, 
hydroelectric power, and other purposes. 
Local cooperation. Fully complied with. 
Libby Dam - Lake Koocanusa Project. Dam is a 
straight concrete gravity overflow type, 420 feet high, 
3,055 feet long, with normal full pool at elevation 2459 
feet above mean sea level. Powerhouse has an initial 
installed capacity of 420,000 kilowatts from four hydroelectric 
generating units with provision for four additional 
units, one of which is currently under construction. 
Lake Koocanusa is 90 miles long, backing water 42 
miles into Canada and has a usable storage capacity of 
4,965,000 acre-feet at 50 percent drawdown. Construction 
of dam was in accordance with treaty between United 
States and Canada relating to international cooperation 
in water-resource development of the Columbia 
River Basin. Construction is complete. 
Operations during fiscal year. Maintenance, hired 
labor: Reservoir was operated through its annual cycle 
of storage and release. Routine structural, mechanical, 
and electrical maintenance was performed on spillway, 
dam powerhouse, and equipment. 
Maintenance, contract: Work continued to upgrade 
and maintain the left abutment instrumentation. 
Libby Additional Units Project. Provides for 
installation of 4 additional units at the Libby Dam Powerhouse. 
Fabrication of generators for units 5 through 8 
is complete; however, only the unit 5 generator was 
installed. Installation of the electrical equipment is 
limited to unit 5. Parts for units 6 through 8 have been 
stored at the site. Project is 99% complete. Units 6 
through 8 have been reclassified inactive. 
Operations during fiscal year. New work, contract: 
Contracts for turbines and generators continued. 
Libby Reregulating Dam Project. Provides for 
construction of a reregulating dam about 10 miles downstream 
of Libby Dam and associated relocation of about 
9 miles of Burlington Northern Railroad, 7.5 miles of St. 
Regis log haul road, 0.5 mile of Forest Development 
Road, and 7.5 miles of Montana State Highway. Funds 
were provided for a construction start in 1977; however, 
courts have found that Congress did not authorize construction 
of the reregulating dam. 
Operations during fiscal year. In FY 82, all work 
was terminated due to court direction. 
Libby Reregulating Dam - Power Units Project. 
Provides for installation of three hydroelectric generating 
units at the reregulating dam with 78,900 kilowatt 
installed capacity. A General Design Memorandum 1, 
Phase II, Preliminary Design Report was approved by 
the Office, Chief of Engineers on March 3, 1981. 
General Investigations 
36. SURVEYS 
Fiscal year costs were $260,258 for navigation studies, 
$194,418 for flood damage prevention studies, $374,377 
for comprehensive studies, $68,446 for miscellaneous 
activities and $58,323 for coordination with other agencies 
and non-Federal interests, a total of $955,822. 
37. COLLECTION AND STUDY OF BASIC DATA 
The work programmed for collection and study of 
basic data covers international water studies, flood 
plain management services, and hydrologic studies. 
Work on international water studies included checking 
Kootenay Lake storage computations to determine compliance 
of West Kootenay Power & Light Co. with orders 
of International Joint Commission, and coordination 
with International Kootenay Lake and Osoyoos Lake 
Board of Control in enforcement of International Joint 
Commission orders. Coordination with the Osoyoos 
Lake Board of Control included technical assistance in 
review of construction and operation plans for the 
recently constructed Osoyoos Lake control structure. 
Technical assistance was provided other Federal and 
non-Federal agencies in flood hazard evaluation and 
related services as requested. Fiscal year costs were 
$3,056 for international water studies, $102,180 for flood 
plain management services, $5,050 for hydrologic studies, 
and $11,925 for Coastal Data Collection, a total of 
$122,211. 
38. PRECONSTRUCTION ENGINEERING AND 
DESIGN 
Blair and Sitcum Waterways, Tacoma Harbor, WA 
Tacoma Harbor, Pierce County, is located in southern 
Puget Sound at Tacoma, WA, about 30 miles south of 
Seattle. 
The proposed plan of improvement provides for (a) 
modification of the existing Federal project for Blair 
Waterway to provide for the construction and maintenance 
of a 45-foot and a 41-foot channel including 
replacement of the East 11th Street Bridge and (b) Federal 
maintenance of the locally constructed Sitcum 
Waterway to depths of 40 and 35 feet. 
Accomplishments during the fiscal year included 
coordination with the Port of Tacoma and contracting 
with the Washington State Department of Transportation 
for bridge replacement evaluations. 
Estimated preconstruction engineering and design 
cost is $2,640,000. Fiscal year costs were $101,682. Total 
costs to date have been $957,163, including $300,000 
appropriated and expended under Section 101(c). 
Chehalis River at South Aberdeen and Cosmopolis, 
WA 
The cities of Aberdeen and Cosmopolis are located at 
the mouth of the Chehalis River in Grays Harbor 
County, west central Washington. The Chehalis River, 
about 125 miles in length, rises in the Willapa Hills in 
west central Washington. 
38-12

SEATTLE, WASHINGTON DISTRICT 
The plan of improvement, authorized in PL99-662, 
would protect most of the left bank flood plain at the 
mouth of the Chehalis River in the cities of Aberdeen 
and Cosmopolis. The improvement would include: an 
earthen levee 22,500 feet long roughly following the left 
bank of the Chehalis River from Devonshire Slough to 
Cosmopolis; 2,200 feet of concrete floodwall in two 
industrial areas; five pumping stations and tide gates; 
and 10 smaller gravity drain culverts with flap gates. 
The levee would protect 1,318 acres of the cities from 
inundation by the standard project flood. 
Accomplishments during the fiscal year included 
completion of hydrologic, hydraulic, and economic studies, 
preparation of design and cost estimates, and Fish 
and Wildlife coordination. 
Estimated preconstruction engineering and design 
cost is $1,474,000. Fiscal year costs were $250,947. Total 
costs to date have been $1,011,711. 
East, West and Duwamish Waterways, Seattle 
Harbor, WA 
Seattle Harbor, WA, an authorized project, includes 
East, West and Duwamish Waterways within its city 
limits. Chief anchorage basin is Elliott Bay, an arm of 
Puget Sound. 
The plan of improvement, authorized in PL99-662, 
includes: Deepening and narrowing East and West 
Waterways (from 34 x 750 feet to 39 x 500 feet); deepening 
and widening Duwamish Waterway (from 34 x 200 feet 
to 39 x 250 feet); replacing the constrictive Burlington 
Northern Railroad Bridge with one having 250 feet 
horizontal clearance; deepening one turning basin to 39 
feet; deauthorizing an unneeded turning basin; mitigating 
for loss of 4 acres shallow-water and 27 acres deepwater 
fish habitat; creating 2 acres of shallow-water 
habitat for fish enhancement; and constructing a public 
boat ramp for recreation access. 
Preconstruction engineering and design studies were 
initiated in October 1984. At the request of the local 
sponsor, further studies were deferred late in FY 86. 
During the fiscal year work involved organizing and 
filing results of sediment testing and foundation exploration 
for future use. 
Estimated preconstruction engineering and design 
cost is $4,380,000. Fiscal year costs were $9,147. Total 
costs to date have been $662,884. 
Grays Harbor, Chehalis and Hoquiam Rivers, WA 
Grays Harbor is a large tidal estuary in southwestern 
Washington. The entrance is 45 miles north of the mouth 
of the Columbia River and 110 miles south of the Strait 
of Juan de Fuca. The estuary lies entirely within Grays 
Harbor County, State of Washington. 
The proposed plan of improvement consists of modifying 
the existing Federal project for Grays Harbor. The 
existing 30-foot channel would be deepened to a depth of 
46 feet through the Outer Bar and widened in this reach 
from the existing 600 feet to a 1,000-foot-wide channel; 
thence, the entrance reach would be widened and deepened 
from the existing designated 350 feet wide by 30 feet 
deep channel to a channel tapering landward from 1,000 
to 600 feet wide and 46 to 38 feet deep; thence, the existing 
channel to Cow Point would be widened and deepened 
from 350 feet wide and 30 feet deep to 400 feet wide 
by 38 feet deep for the South reach and Crossover reach 
and to 350 feet wide by 38 feet deep for the Moon Island, 
Hoquiam, and Cow Point reaches; and thence, the Aberdeen 
and South Aberdeen reaches would be widened and 
deepened from the existing designated 200 feet wide by 
30 feet deep channels to channels 250 feet wide by 36 feet 
deep. Two turning basins located at Aberdeen would be 
constructed and the existing railroad bridge would be 
replaced with a new bridge having horizontal clearance 
of 250 feet. 
During the fiscal year environmental and engineering 
studies were essentially completed, leading to a General 
Design Memorandum (GDM). Based on preliminary 
results, it appears project dimensions can be reduced 
without affecting the project benefits. The final project 
design will be presented in the GDM which is scheduled 
for completion in June 1988. 
Estimated preconstruction engineering and design 
cost is $6,000,000. Fiscal year costs were $606,375. Total 
costs to date have been $3,571,137. 
Yakima River at Union Gap, WA 
The flood plan under study is located between the 
confluence of the Yakima and Naches Rivers and the 
community of Union Gap, within Yakima County, in 
southeastern Washington State. 
The proposed plan of improvement consists of: Constructing 
two levees downstream of the Moxee Bridge on 
the Yakima River (1.1 miles of levee on the west bank 
and 2.5 miles on the east bank); improving sections of 
existing 7 miles of levee by raising and providing additional 
riprap; installation of drainage control gates on 
existing culverts and flood plain management for 
unprotected areas. 
Preconstruction engineering and design studies were 
initiated in October 1984. Study was deferred in FY 86. 
FY 87 work consisted of final coordination and study 
termination. 
Estimated preconstruction planning cost is $566,000. 
Fiscal year costs were $5,483. Total costs to date have 
been $501,851. No work is scheduled for FY 88. 
38-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 38-A COST AND FINANCIAL STATEMENT 
See 
Section Total to 
In Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
1. Anacortes Harbor, 
WA (Federal Funds) 
(Contrib. Funds) 
2. Bellingham Harbor 
WA (Federal Funds) 
(Contrib. Funds) 
3. Edmonds Harbor, WA5 
Everett Harbor and 
Snohomish River, 
WA (Federal Funds) 
(Contrib. Funds) 
Grays Harbor and 
Chehalis River, WA 
(Federal Funds) 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor 
Rehab. 
Approp. 
Cost 
Major 
Rehab. 
Approp. 
Cost 
- 185,000 167,000 
- 175,612 157,312 
- 15,000 
- 11,813 
- 188,000 
3,147 170,000 
- 160,000 20,000 45,000 
- - 28,836 195,680 
792,000 155,000 291,000 492,000 
689,169 253,987 294,189 489,763 
- - 
- -9,635 
4,347,000 4,252,725 
4,339,277 4,243,299 
-9,600 - 
36 - 
3,927,140 3,278,700 
3,944,749 3,267,434 
222,345 
222,3451 
896,239 
877,163 
59,523 
59,523 
5,000 
5,000 
1,566,840 
1,566,8402 
1,252,067 
1,234,0273 
29,421 
29,421 
9,103 
9,103 
225,000 
224,516 
1,775,744 
1,775,7446 
7,554,079 
7,551,1867 
116,618 
116,618 
584,090 
584,090 
5,155,796 
5,155,7968 
81,516,029 
81,501,9539 
120,592 
120,592 
4,606,145 
4,606,145 
38-14

SEATTLE, WASHINGTON DISTRICT 
Project 
(Contrib. Funds) 
Kenmore Navigation 
Channel, WA 
Lake Crockett, WA 
8. Lake Washington 
Ship Canal, WA 
10. Olympia Harbor, 
WA 
11. Port Townsend, WA 
(Federal Funds) 
(Contrib. Funds) 
13. Puget Sound and its 
Tributary Waters, 
WA 
14. Quillayute River, 
WA 
(Federal Funds) 
(Contrib. Funds) 
15. Seattle Harbor, WA 
(Federal Funds) 
TABLE 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section 
In Text FY 84 FY 85 FY 86 
Total to 
Funding FY 87 Sep. 30, 1987 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost. 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
22 
35,834 
35,834 
47,889 
47,889 
946,000 
946,00010 
437,000 
436,889 
377,990 
377,99011 
668,440 
656,591 
4,611,436 
4,611,43612 
64,764,910 
64,658,814'13 
,970,000 1,120,230 - - 7,465,230 
,951,805 994,066 133,987 10,373 7,465,230 
- - - - 359,315 
-- - - 359,31514 
- -100,000 114,000 739,377 
-- - 100,000 111,719 737,09615 
-- - - 480,899 
-- - - 480,899 
- - - 52,000 78,787 
- - - 52,000 78,787 
-- - - 92,423 
-- - - 92,423 
-- - - 43,337 
- - - - 43,337 
593,000 542,500 617,000 597,000 17,011,802 
552,674 575,607 612,490 597,072 17,000,14516 
- - - - 521,850 
- - - - 521,85017 
454,000 536,261 17,000 456,050 9,592,072 
452,875 530,793 19,410 456,244 9,586,582 
-- - - 20,000 
- - - - 20,000 
- - - - 170,335 
-- - - 170,335 
405,000 274,000 1,001,000 393,000 7,585,746 
398,225 273,308 940,157 459,554 7,583,988 
38-15 
- - 134,000 303,000 
- - 112,775 324,114 
- -.. - 155,500 
- - - 143,651 
2,999,240 3,595,440 3,755,000 3,641,000 
2,936,228 3,560,062 3,778,291 3,640,034

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 38-A 
(Continued) 
COST AND FINANCIAL STATEMENT 
See 
Section 
In Text Project 
(Contrib. Funds) 
16. Swinomish Channel, 
WA 
(Federal Funds) 
(Contrib. Funds) 
17. Tacoma Harbor, WA 
(Federal Funds) 
(Contrib. Funds) 
18. Waterway 
Connecting Port 
Townsend and Oak 
Bay, WA 
19. Willapa River and 
Harbor and Naselle 
River, WA 
(Federal Funds) 
(Contrib. Funds) 
21. Elwha Klallam 
Reservation, Elwha 
River, WA 
23. Howard A. Hanson 
Dam, WA 
(Federal Funds) 
(Contrib. Funds) 
26. Little Quilcene 
River, near 
Quilcene, WA 
27. Mud Mountain 
Dam, WA 
(Federal Funds) 
------ 
Total to 
Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
- 50,000 
- 50,000 
90,000 
89,712 
578,000 
573,690 
16,500 
16,169 
84,000 
80,542 
50,000 110,000 
49,810 105,763 
515,000 
496,871 
693,049 
681,307 
26,000 
26,000 
- - 
- 52,000 
619 52,000 
- 115,650 
4,953 113,884 
68,000 20,000 
70,712 19,091 
727,000 
616,769 
- 1,439,000 
- 1,326,358 
805,500 
918,895 
9,000 
7,981 
1,200,000 
1,196,536 
69,333 
69,333 
20,000 
20,000 
808,332 
808,33218 
6,243,940 
6,234,613 
32,000 
32,000 
2,383,891 
2,383,89119 
1,390,745 
1,390,74520 
1,144,416 
1,144,416 
222,500 
222,500 
73,322 
73,322 
378,378 
378,378 
1,579,269 
1,579,26921 
13,356,628 
13,351,96122 
98,372 
98,372 
405,900 
403,274 
37,048,061 
37,048,061 
10,363,800 
10,336,05523 
2,000,000 
2,000,000 
9,000 
7,981 
15,934,848 
15,818,74224 
38-16 
347,760 20,000 353,000 376,000 
352,506 19,797 149,813 570,290

TABLE 38-A 
(Continued) 
SEATTLE, WASHINGTON DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section 
In Text Project 
(Contrib. Funds) 
29. Spokane River, 
Spokane, WA 
30. Stillaguamish 
River, WA 
(Federal Funds) 
(Contrib. Funds) 
31. Tacoma, Puyallup 
River, WA 
32. Wynoochee Lake, 
WA 
33. Albeni Falls Dam, 
ID 
34. Chief Joseph Dam- 
Rufus Woods Lake, 
WA 
35. Libby Dam, Lake 
Koocanusa, MT 
(Federal Funds) 
(Contrib. Funds) 
Total to 
FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
1,138,000 2,967,944 1,230,000 1,151,000 
1,118,723 2,937,358 1,272,504 1,152,114 
19,341,476 
19,297,88325 
285,908 
285,908 
Funding 
Maint. 
Approp. 
Cost 
Minor 
Rehab. 
Approp. 
Cost 
Major 
Rehab. 
Approp. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
155,000 
162,671 
100,000 
100,163 
40,000 50,000 
39,829 48,911 
110,000 
110,406 
40,000 
40,851 
100,000 
96,786 
35,000 
32,177 
994,500 1,047,877 1,032,000 1,382,000 
963,671 1,027,462 1,020,809 1,405,109 
2,018,000 
2,062,473 
18,200,000 
18,292,811 
5,890,000 
5,811,108 
1,915,000 
1,844,303 
2,860,500 
2,824,490 
2,580,000 
2,555,530 
13,990,000 
14,012,821 
5,968,576 
5,966,340 
830,000 
853,369 
2,877,000 
2,852,195 
2,974,000 
2,971,854 
11,023,000 
10,091,596 
6,608,000 
6,525,685 
630,000 
715,232 
3,653,000 
3,654,719 
2,743,000 
2,823,626 
6,200,000 
7,151,901 
6,885,000 
7,054,829 
17,893 
3,746,100 
3,782,076 
- 520,000 
- 515,530 
- 9,000 
- 8,891 
38-17 
- -I- ----- -- 
1 ~-------1-~~11-^-~ ~ "111' - - 
520,000 
515,530 
3,928 
3,928 
9,000 
8,891 
220,594 
220,59426 
1,674,845 
1,671,610 
21,000 
21,000 
3,947,853 
3,947,85327 
531,597 
528,311 
23,494,445 
23,494,44528 
12,291,446 
12,249,95329 
31,878,297 
31,878,29730 
31,216,831 
31,192,23531 
512,291,235 
512,262,31732 
79,755,511 
79,722,72733 
297,630 
297,630 
543,726,14034 
543,723,88935 
29,206,579 
29,144,30836 
1,458,252 
1,458,25237

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 38-A 
(Continued) 
COST AND FINANCIAL STATEMENT 
'Excludes $2,000 Coast Guard funds expended. 
2Includes $56,582 appropriated and expended for previous 
project. 
lIncludes $1,092 appropriate and expended for previous 
project. 
4Excludes $13,000 Coast Guard funds expended and 
$2,159,633 expended by Port of Bellingham in fulfilling 
requirements of local cooperation. 
5Constructed by local interests. Corps of Engineers is 
responsible for maintenance. 
6Includes $418,209 appropriated and expended for previous 
projects. Excludes $43,000 Coast Guard funds expended. 
7Includes $5,869 appropriated and expended for previous 
project. 
"Includes $124,945 appropriated and expended for recreation 
facilities at completed project (Code 710), and $113,134 
appropriated and expended for previous projects. Excludes 
$162,000 Navy funds and $6,000 Coast Guard funds expended. 
"Includes $37,415 appropriated and expended for previous 
projects. Excludes $798,135 Emergency Relief Funds and 
$57,000 Public Works Administration funds expended. 
"'Includes $148,765 preauthorization cost, appropriated 
and expended. 
"Includes $117,750 appropriated and expended for recreation 
facilities at completed project (Code 710). 
'2Includes $779,655 for recreation facilities at completed 
project (Code 710), and $485,002 for previous projects, appropriated 
and expended. Excludes $246 567 expended by State of 
Washington and $742,071 expended by King County. Excludes 
$192,516 Public Works Administration funds expended. 
S3Includes $1,631,195 (1916 to 1936) and $338,163 subsequently 
appropriated and expended under Maintenance and 
Operation of Dams and Other Improvements of Navigable 
Waters. 
"Includes $183,257 for previous projects, and $18,700 
expended for restudy Fiscal Years 1968-1973. Excludes 
$105,467 Public Works Administration Funds expended. 
15Includes $14,418 expended for previous projects. 
S6Includes $67,496 appropriated and expended for previous 
project. 
'?Excludes Navy funds expended on dredging river channel 
in 1944 and Coast Guard funds expended for channel 
dredging in 1948 and 1949. 
S8Excludes $1,000 Coast Guard funds expended and $9,000 
expended by Skagit County in fulfilling requirements of local 
cooperation. 
19Includes $159,584 appropriated and expended for 
previous projects. Excludes $51,609 Public Works Administration 
Funds expended. Excludes $62,697, value of work contributed 
by Port of Tacoma in fulfilling requirements of local 
cooperation. 
20Includes $5,347 appropriated and expended for previous 
projects. 
2 1Includes $228,084 appropriated and expended for previous 
projects. Excludes 40,000 Coast Guard funds and 
$192,557 Emergency Relief Funds expended. 
22Includes $309,177 appropriated and expended for previous 
projects. Excludes $78,532 Public Works Administration 
Funds expended. 
2"Includes $66,678 appropriated and expended under 
Maintenance and Operation of Dams and Other Improvements 
of Navigable Waters. 
24Includes $87,785 appropriated and expended for recreation 
facilities at completed project (Code 710). Excludes $26,000 
Emergency Relief Funds expended. 
25Includes $5,000 Advance Procurement Funds expended 
and $198,578 appropriated and expended under Maintenance 
and Operation of Dams and Other Improvements of Navigable 
Waters. 
26Excludes $281,000 Works Progress Administration 
Funds and $85,999 Emergency Relief Funds expended. 
27Includes $5,035 appropriated and expended for recreation 
facilities at completed project (Code 710). 
28Includes $102,200 appropriated and expended for recreation 
facilities at completed project (Code 710). 
2"Includes $66,678 appropriated and expended under 
Maintenance and Operation of Dams and Other Improvements 
of Navigable Waters. 
o0 
Includes $136,736 Public Works Acceleration Act Funds 
and $971,947 for recreation facilities at completed project (Code 
710), appropriated and expended. 
1'Includes $174,776 Special Recreation Use Fees and 
$10,000 Advance Procurement Funds, appropriated and 
expended. Includes $198,578 appropriated and expended under 
Maintenance and Operation of Dams and Other Improvements 
of Navigable Waters. 
32Includes $58,000 Public Works Acceleration Act Funds 
and $147,983 for recreation facilities at completed project (Code 
710), appropriated and expended. 
33Includes $774,561 appropriated and expended under 
Maintenance and Operation of Dams and Other Improvements 
of Navigable Waters. 
34Includes $42,221,634 for additional units, $16,276,363 for 
reregulating dam, and $475,000 for power planning. 
3"Includes $42,219,382 for additional units, $16,276,363 for 
reregulating dam, and $475,000 for power planning. Includes 
$7,240,838 appropriated and expended for preconstruction 
planning, and $132,300 appropriated and expended for Kelley 
Flats Airport. 
36Includes $366,224 appropriated and expended under 
Maintenance and Operation of Dams and Other Improvements 
of Navigable Waters. 
"7Excludes $185,349 expended by Federal Aviation 
Agency and $17,500 expended by Lincoln County-City of 
Libby Joint Airport Board. 
38-18

TABLE 38-B 
SEATTLE, WASHINGTON DISTRICT 
AUTHORIZING LEGISLATION 
Date 
Authorizing 
Act 
Mar. 2, 1919 
Sep. 3, 1954 
June 25, 1910 
July 3, 1930 
Aug. 26, 1937 
Sep. 3, 1954 
July 3, 1958 
Oct. 27, 1965 
June 25, 1910 
July 3, 1930 
June 20, 1938 
Sep. 3, 1954 
July 14, 1960 
Aug. 13, 1968 
5. 
June 3, 1896 
Mar. 2, 1907 
Mar. 2, 1907 
Project and Work Authorized 
ANACORTES HARBOR, WA 
Channel in Capsante Waterway. 
Mooring basin. 
BELLINGHAM HARBOR, WA 
Whatcom Creek Waterway 26- and 18-foot channels. 
Entrance channel in Squalicum Creek Waterway. 
Maintenance of southerly half and westerly end of 
Squalicum Creek Basin. 
Small-boat basin adjacent to Squalicum Creek 
Waterway. 
Whatcom Creek Waterway, 30-foot channel. 
EDMONDS HARBOR, WA 
Maintenace of rubblemound breakwater, 
1,850 feet long, and entrance channel, 
13 feet deep, 610 feet long and 65 feet 
wide. 
EVERETT HARBOR AND SNOHOMISH 
RIVER, WA 
Training dike 10,500 feet long extending across bar 
at outlet of old river channel. 
Raise 6,000 feet of training dike, extend spur dike, 
widen gap in dike as required, maintain East 
Waterway and channel to gap. 
Abandon project for Snohomish River and provide 
settling basin near 14th Street. 
Spur dike at Preston Point, remove training dike 
north of river outlet, enlarge channel to 14th Street, 
and deepen settling basin. 
Widen channel from settling basin to gap; extend 
channel to head of Steamboat Slough; and a settling 
basin within upper channel reach. 
Raise and extend existing training dike; and construct 
breakwater on westerly and southerly sides 
of 14th Street small-boat basin.4 
GRAYS HARBOR AND CHEHALIS 
RIVER, WA 
South jetty. 
A north jetty 9,000 feet long. 
The 18-foot channel. 
See 
Section 
in Text 
H. Doc. 147, 88th Cong., 
1st Sess., P.L. 89-298 
H. Doc. 1108, 60th Cong., 
2d Sess. 
H. Doc. 377, 71st Cong., 
2d Sess. 
H. Doc. 546, 75th Cong., 
3d Sess. 
H. Doc. 569, 81st Cong., 
2d Sess. 
H. Doc. 348, 86th Cong., 
2d Sess. 
H. Doc. 357, 90th Cong., 
2d Sess.5 
Annual Report, 1895, 
pp. 3517-3533 
Rivers and Harbors 
Committee Doc. 2, 59th 
Cong., 2d Sess. 
H. Doc. 507, 59th Cong., 
1st Sess. 
38-19 
Documents 
H. Doc. 1117, 64th Cong., 
1st Sess. 
S. Doc 102, 83rd Cong., 
2d Sess. 
H. Doc. 1161, 60th Cong., 
2d Sess. 
H. Doc. 187, 70th Cong., 
1st Sess. 
Rivers and Harbors 
Committee Doc. 70, 74th 
Cong., 1st Sess.' 
H. Doc. 558, 82d Cong., 
2d Sess. 2 
S. Doc. 46, 85th Cong., 
1st Sess.3 
1. 
3. 
__

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 38-B 
(Continued) 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized 
June 25, 1910 
June 25, 1910 
Aug. 8, 1917 
Jan. 21, 1927 
July 3, 1930 
Aug. 30, 1935 
Aug. 30, 1935 
Dec. 22, 1944 
as amended 
Mar. 2, 1945 
June 30, 1948 
Sep. 3, 1954 
Sep. 3, 1954 
July 14, 1960 
as amended 
Mar. 2, 1945 
Dec. 22, 1944 
as amended 
June 25, 1910 
Mar. 4, 1913 
Aug. 8, 1917 
Sep. 22, 1922 
June 26, 19348 
Aug. 30, 19359 
Dec. 22, 1944 
as amended 
Extend north jetty 7,000 feet; length of south jetty 
fixed at 13,734 feet. 
A 6-foot channel above Cosmopolis 
Dredging in bar channel. 
Dredging in bar channel. 
16-foot channel from Cosmopolis to Montesano 6 
Reconstruct north and south jetties to an elevation of 
16 feet above mean lower low water. 
Maintain 26-foot channel below Aberdeen (as authorized 
by Public Works Administration Dec. 11, 1933) 
and combining projects for Grays Harbor and bar 
entrance and Grays Harbor, inner portion, and 
Chehalis River under a modified project for Grays 
Harbor and Chehalis River. 
Construction, operation, and maintenance of 
recreation facilities 
Maintain 30-foot depth in channel from deep water in 
Grays Harbor to Port of Grays Harbor Commission 
terminal, which was deepened from 26 to 30 feet 
with Navy funds. 
14-foot channel to Bay City; breakwater at 
Westhaven; protection of Point Chehalis; and 
maintenance of Westhaven entrance channel.7 
Dredging and maintenance of a 30-foot channel and 
turning basin from Aberdeen to Cosmopolis. 
Additional breakwater, 1,400 feet long, at Westhaven 
Cove. 
KENMORE NAVIGATION CHANNEL, WA 
Construction of navigation channel 15 feet deep 
consisting of a 100-foot wide inner channel 900 feet 
long, an 800-foot long transition channel with 24 
30-foot bend and maximum width of 190 feet, and a 
120-foot wide outer channel 1,200 feet long. 
LAKE CROCKETT, WA 
Small-boat basin. 
Construction, operation, and maintenance of 
recreation facilities. 
LAKE WASHINGTON SHIP CANAL, WA 
For a double lock and fixed dam with gated spillway 
and necessary accessory works at entrance to 
Salmon Bay; dredging a channel from locks to deep 
water in Puget Sound, and excavation by local 
interests of a channel from locks into Lake 
Washington. 
Dredging below locks and revetting canal banks. 
Increased dimensions of channel between Puget 
Sound and locks and a 600-foot extension of lower 
guide pier. 
Operating and care of locks and dam provided for 
with funds from War Department appropriations for 
Rivers and Harbors. 
Enlarge channel between locks and Lake 
Washington. 
Construction, operation, and maintenance of 
recreation facilities 
Documents 
Rivers and Harbors 
Committee Doc. 29, 
61st Cong., 2d Sess. 
H. Doc. 1125, 60th Cong., 
2d Sess. 
H. Doc. 1729, 64th Cong., 
2d Sess. 
H. Doc. 582, 69th Cong., 
2d Sess. 
H. Doc. 315, 70th Cong., 
1st Sess. 
Rivers and Harbors 
Committee Doc. 2, 74th 
Cong., 1st Sess. 
11. Doc. 53, 73rd Cong., 1st 
Sess.; Rivers and 
Harbors Committee 
Doc. 2, 74th Cong., 
1st Sess. 
Sec. 4, Flood Control Act 
of 1944 
Report in Office, Chief of 
Engineers 
H. Doc. 635, 80th Cong., 
2d Sess. 
H. DI)oc. 412, 83d Cong., 
2d Sess. 
H. Doc. 30, 84th Cong., 
1st Sess.5 
Sec. 107, P.L. 86-645. 
Authorized by Chief of 
Engineers, Oct. 7, 1980 
H. Doc. 303, 77th Cong., 
1st Sess.5 
Sec. 4, Flood Control Act 
of 1944 
H. Doc. 953, 60th Cong., 
1st Sess. 
H. Doc. 800, 64th Cong., 
1st Sess. 
H. Doc. 324, 67th Cong., 
2d Sess. 
H. Doc. 140, 72d Cong., 
1st Sess.5 
Sec. 4, Flood Control Act 
of 1944 
38-20 
6. 
8.

TABLE 38-B 
(Continued) 
SEATTLE, WASHINGTON DISTRICT 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
10. OLYMPIA HARBOR, WA 
Jan. 21, 1927 
July 3, 1930 
Aug. 30, 193510 
Aug. 26, 1937 
Mar. 2, 1945 
July 3, 1958 
July 13, 1892 
July 3, 1930 
Mar. 2, 1945 
Sep. 3, 1954 
Mar. 2, 1919 
Mar. 3, 1925 
July 3, 1930 
Aug. 30, 1935 
July 13, 1892 
Aug. 30, 1935 
Oct. 23, 1962 
June 13, 1902 
July 3, 1930 
Aug. 26, 1937 
Channel 22 feet deep and 150 feet wide. 
Channels of 26-foot depth on east side of harbor. 
Elimination from project of 12-foot channel on east 
and west sides of harbor, and for a channel 30 feet 
deep and 300 feet wide between Budd Inlet and port 
terminal, with turning basin of same depth. 
Widen outer portion of channel to 500 feet, and 
widen entrance to turning basin. 
Entrance channel 500 feet wide to and including 
a turning basin 3,350 feet long and generally 
960 feet wide, all at a depth of 30 feet at mean 
lower low water.7 
PORT TOWNSEND, WA 
Mooring basin and breakwater. 
PUGET SOUND AND ITS TRIBUTARY 
WATERS, WA 
Maintenance of the rivers tributary to Puget Sound 
by snagging and dredging; and removal of floating 
debris from Seattle Harbor. 
QUILLAYUTE RIVER, WA 
Jetty (5 feet high) on easterly side of mouth, and a 
dike on westerly side, to stabilize 
entrance. 
Maintenance dredging to provide a channel 6 feet 
deep and of suitable width from ocean to within 
river mouth. 
Raising jetty to 15 feet; channel 10 by 100 feet, 2,000 
feet long; moorage basin.11 
SEATTLE HARBOR, WA 
Maintenance of East and West Waterways 750 feet 
wide and 34 feet deep, and of Duwamish Waterway 
20 feet deep and 150 feet wide as far south as 
Eighth Avenue South Bridge. 
Enlargement of Duwamish Waterway. 
Maintenance of East Waterway between 750-foot 
section and Spokane Street, and turning basin at 
junction of East and Duwamish Waterways. 
SWINOMISH CHANNEL, WA 
Channel 4 feet deep and 100 feet wide, and dike 
construction. 
Enlargement of channel to present project 
dimensions. 
Removal of navigation hazards at "Hole-in-the-Wall". 
TACOMA HARBOR, WA 
City Waterway. 
Hylebos Waterway 
H. Doc. 244, 69th Cong., 
1st Sess. 
Rivers and Harbors 
Committee Doc. 5, 71st 
Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 21, 
73rd Cong., 2d Sess. 
Rivers and Harbors 
Committee Doc. 75, 
74th Cong., 2d Sess. 
H. Doc, 699, 76th Cong., 
3d Sess.5 
H. Doc. 418, 84th Cong. 
2d Sess.5 
Annual Report for 1893, 
page 342510 
H. Doc. 125, 71st Cong., 
1st Sess. 
H. Doc. 218, 78th Cong., 
1st Sess. 
H. Doc. 579, 81st Cong., 
2d Sess.5 
S. Doc. 313, 65th Cong., 
3d Sess. 
H. Doc. 108, 68th Cong., 
1st Sess. and H. Doc. 
126, 71st Cong., 2d Sess.5 
H. Doc. 211, 72d Cong., 
1st Sess.5 
H. Doc. 31, 52d Cong., 
1st Sess., and Annual 
Report, 1892, p. 2752 
S. Committee Print, 73rd 
Cong., 1st Sess. 
H. Doc. 499, 87th Cong., 
2d Sess.5 
H. Doc. 76, 56th Cong., 
2d Sess. 
Rivers and Harbors 
Committee Does. 25, 
71st Cong., 2d Sess., 
and 91, 74th Cong., 
2d Sess. 
38-21 
11. 
13. 
14. 
15. 
16. 
17.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 38-B 
(Continued) 
See Date 
Section Authorizing 
in Text Act 
Aug. 30, 1935 
Sep. 3, 1954 
Oct. 23, 1962 
AUTHORIZING LEGISLATION 
Project and Work Authorized Documents 
Training walls at mouth of Puyallup River (previous- Rivers and Harbors 
ly authorized by Public Works Administration Sep. Committee Doc. 55, 
6, 1933) 72nd Cong., 2d Sess. 
Blair Waterway extension. H. Doc 171, 84th Cong., 
2d Sess. 
Blair and Hylebos Waterways extension. S. Doc. 101, 87th Cong., 
2d Sess.5 
18. 
Mar. 4, 191312 
19. 
July 27, 1916 
Aug. 30, 19359 
Aug. 30, 19351 
Mar. 2, 1945 
Sept. 3, 1954 
21. 
June 30, 1948 
as amended 
May 17, 1950 
Aug. 6, 1958 
July 24, 1946 
as amended 
June 22, 1936 
Dec. 22, 1944 
as amended 
July 24, 1946 
as amended 
June 22, 1936 
June 28, 1938 
WATERWAY CONNECTING PORT 
TOWNSEND AND OAK BAY, WA 
Canal 15 feet deep, 75 feet wide on the bottom, and 
about 4,800 feet long; construct jetties to protect 
channel at southern or Oak Bay end, and a bulkhead 
for retention of dredging material. 
WILLAPA RIVER AND HARBOR AND 
NASELLE RIVER, WA 
Channel 24 feet deep, 200 feet wide, in Willapa River, 
and 150 feet wide in the forks. 
Maintenance of channel over bar to a depth of 26 feet 
and minimum width of 500 feet. 
For cutoff channel at Narrows. 
Channel from deep water in Palix River to Bay 
Center dock. 
Widen Willapa River channel to 360 and 250 feet 
between South Bend and the forks; Tokeland and 
Nahcotta basins; and Naselle River clearance. 
ELWHA KLALLAM RESERVATION, ELWHA 
RIVER, WA 
7,640-foot long levee, 8 feet high with 
12-foot top width and bottom width 
of 45 feet. 
HOWARD A. HANSON DAM, WA 
Eagle Gorge flood control dam on Green River. 
Redesignation of project as Howard A. Hanson Dam 
LITTLE QUILCENE RIVER, NEAR QUILCENE, 
WA 
Construction of riprap bank protection. 
MUD MOUNTAIN DAM, WA 
Flood control dam on White River. 
Construction, operation, and maintenance of 
recreation facilities 
SPOKANE RIVER, SPOKANE, WA 
Construction of riprap bank protection. 
STILLAGUAMISH RIVER, WA 
Improvement of flood channel by clearing and bank 
revetment at 26 places; concrete weir at head of 
Cook Slough; and 2 cutoff channels in Cook Slough. 
Maintenance of improvements 
H. Doc. 625, 62d Cong., 
2d Sess. 
H. Doc. 706, 63d Cong., 
2d Sess. 
Rivers and Harbors 
Committee Doc. 41, 
72d Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 37, 
73d Cong., 2d Sess. 
H. Doc. 481, 76th Cong., 
2d Sess. 
H. Doc. 425, 83d Cong., 
2d Sess.5 
Sec. 205, P.L. 80-858 
Authorized by Chief of 
Engineers, Sep. 1, 1987 
H. Doc. 271, 81st Cong., 
1st Sess.5 
P.L. 85-592 
Sec. 14, P.L. 79-526 
Authorized by Chief of 
Engineers, May 21, 1987 
S. Committee Print, 
Puyallup River, WA, 
74th Cong., 2d Sess. 
Sec. 4, Flood Control Act 
of 1944 
Sec. 14, P.L. 79-526 
Authorized by Chief of 
Engineers, Dec. 19, 1986 
H. Doc. 657, 71st Cong., 
3d Sess.5 
P.L. 75-761 
38-22 
23. 
26. 
27. 
29. 
30.

TABLE 38-B 
(Continued) 
See Date 
Section Authorizing 
in Text Act 
31. 
June 22, 1936 
Dec. 22, 1944 
as amended 
32. 
Oct. 23 1962 
Dec. 22, 1944 
as amended 
Mar. 7, 1974 
Mar. 7, 1974 
33. 
May 17, 1950 
Dec. 22, 1944 
as amended 
July 24, 1946 
June 30, 1948 
July 9, 1952 
Dec. 22, 1944 
as amended 
Oct. 22, 1976 
as amended 
May 17, 1950 
Nov. 7, 1966 
Jan. 2, 1968 
Aug. 13, 1968 
June 19, 1970 
Dec. 31, 1970 
SEATTLE, WASHINGTON DISTRICT 
AUTHORIZING LEGISLATION 
Project and Work Authorized 
TACOMA, PUYALLUP RIVER, WA 
Channel improvement to protect people and industrial 
section of city of Tacoma. 
Construction, operation, and maintenance of 
recreation facilities. 
WYNOOCHEE LAKE, WA 
Dam and reservoir for water supply, flood control, 
irrigation, fish and wildlife, and recreation. 
Construction, operation, and maintenance of 
recreation facilities. 
Transfer to State of Washington as a part of project 
costs, $696,000 for construction of fish hatchery 
facilities. 
Amend contract between city of Aberdeen and 
United States for use of storage space, permitting 
deferral of the major portion of the first 10-year 
payments. 
ALBENI FALLS DAM, ID 
Multi-purpose dam with powerhouse. 
Construction, operation, and maintenance of 
recreation facilities. 
CHIEF JOSEPH DAM - RUFUS WOODS 
LAKE, WA 
Multi-purpose dam and powerhouse on Columbia 
River at Foster Creek. 
Redesignation of the project as Chief Joseph Dam. 
Designation of reservoir as Rufus Woods Lake. 
Construction, operation, and maintenance of 
recreation facilities. 
School facilities for education of dependents of 
construction personnel. 
LIBBY DAM - LAKE KOOCANUSA, MT 
Multi-purpose dam and powerhouse, and 
reregulating facilities. 
School facilities for education of dependents of 
construction personnel, Libby project. 
Airport facility at Kelley Flats, MT. 
Design standards for relocation of Montana State 
Highway 37 to be those adopted by State of 
Montana pursuant to provisions of Highway Safety 
Act of 1966. 
Participation with State of Montana in construction, 
operation and maintenance of fish hatchery 
facilities. 
Designation of lake formed by the waters impounded 
by Libby Dam as Lake Koocanusa. 
Documents 
S. Committee Print, 
Puyallup River, WA, 
74th Cong. 2d Sess.5 
Sec. 4, Flood Control Act 
of 1944 
H. Doc. 601, 87th Cong., 
2d Sess.5 
Sec. 4, Flood Control Act 
of 1944 
P.L. 93-251 
P.L. 93-251 
S. Doc. 9, 81st Cong., 
1st Sess.5 
Sec. 4, Flood Control Act 
of 1944 
H. Doc. 693, 79th Cong., 
2d Sess.5 
P.L. 858, 80th Cong., 
2d Sess. 
P.L. 469, 82d Cong., 
2d Sess. 
Sec. 4, Flood Control Act 
of 1944 
P.LI. 94-587 
P.L. 95-26 
H. Doc. 531, 81st Cong., 
2d Sess.5 
P.L. 89-789 
P.L. 90-23914 
P.L. 90-48315 
P.L. 91-28216 
P.L. 91-625 
38-23 
34. 
35. 
I _ ~ _ 
P

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 38-B 
(Continued) 
AUTHORIZING LEGISLATION 
Date 
Authorizing 
Act Project and Work Authorized 
Dec. 31, 1970 
Mar. 7, 1974 
Mar. 7, 1974 
Mar. 7, 1974 
Mar. 7, 1974 
Mar. 7, 1974 
Design and construction of sewage collection and 
sewage treatment facility as part of relocation of 
municipal facilities of Rexford, MT; and 
compensation for railroad employees suffering longterm 
economic injury through reduction of income 
as result of the relocation of rail transportation 
facilities due to the construction of Libby Dam. 
Phase I design memorandum stage for installation 
of power generating facilities at Libby Reregulating 
Dam. 
Construction of fish production measures to 
compensate for fish losses attributed to the project, 
and for acquisition of necessary real estate, 
construction of access roads and utilities (amends 
P.L. 91-282 by increasing limitation from $750,000 
to $4,000,000). 
Acquisition of land not to exceed $2,000,000 for 
prevention of wildlife grazing losses caused by the 
project. 
Reimbursement (not to exceed $350,000) to Boundary 
County, ID for reconstruction of Deep Creek 
Bridge made necessary by duration of high flows 
during drawdown operations at Libby Dam. 
Compensation, not to exceed $1,500,000, to Drainage 
Districts and owners of leveed and unleveed lands, 
in Kootenai Flats, Boundary County, ID for 
damages caused by duration of higher flows during 
drawdown operations at Libby Dam. 
'Contains latest published map of Squalicum Creek 
Waterway. 
2Contains latest published map of small-boat basin. 
:Contains latest published map of Whatcom Creek 
Waterway. 
4Deferred. 
5Contains latest published map. 
"Inactive. 
7A portion deferred. 
'Permanent Appropriations Repeal Act. 
Included in Public W c .s Administration Program. 
P.L. 91-611 
S. Doc. 93-29, 93d Cong., 
1st Sess., P.L. 93-251 
P.L. 93-251 
P.L. 93-251 
P.L. 93-251 
P.L. 93-251 
10Annual Report for 1913 contains latest published map 
(page 3127.) t"Maintenance of these items, as well as sandspit north of 
James Island, is included in this modification. 
12Annual Report of 1915 contains latest published map 
(page 3441). 
3"Included in Emergency Relief Program, May 28, 1935. 
"1Supplemental Appropriations Act of 1968, Section 502. 
5'Flood Control Act of 1968, Section 212. 
16River Basin Monetary Authorization and Miscellaneous 
Civil Works Amendments Act of 1970, Section 7. 
38-24 
See 
Section 
in Text Documents

SEATTLE, WASHINGTON DISTRICT 
TABLE 38-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sep. 30, 1987 
Full Report Operation 
See Annual and 
Project Status Report For Construction Maintenance 
Anacortes Navigation Channel, WA' Completed 1977 825,2634 - 
Bellingham Harbor, WA (I&J 
Street Waterway)' Completed 1966 125,6345 - 
Bellingham, Squalicum Small 
Boat Harbor, WA' Completed 1981 1,744,0256 - 
Blaine Harbor, WA Completed 1958 346,650 - 
Columbia River, Wenatchee 
to Kettle Falls, WA Completed 1923 274,3907 7,693 
East Bay Small Boat Basin, 
Olympia, WA' Completed 1985 1,619,9568 - 
Ediz Hook, WA Completed 1986 5,878,7409 1,124,86010 
Flathead River, MT Completed 1901 9,811 - 
Floating Breakwater Prototype 
Test Program, WA' Completed 1985 1,461,590 - 
Friday Harbor Marina, WA' Completed 1985 1,618,53711 - 
Hammersley Inlet, WA Completed 1950 9,000 10,683 
Hoquiam River, WA Completed 1950 51,294 5,316 
Kingston Harbor, WA Completed 1967 262,57012 5,000'13 
Kootenai River, ID and MT Completed 1933 9,255 5,643 
Mats Mats Bay, WA' Completed 1970 137,679'14 - 
Neah Bay, WA Completed 1982 2,057,266 1,854,05815 
Okanogan and Pend Oreille Rivers, WA Abandoned 1913 63,880 7,634 
Polson Bay, Flathead Lake, MT Completed 1918 4,491 259 
Port Angeles Harbor, WA2 Completed 1960 470,873 - 
Port Gamble Harbor, WA Completed 1953 11,91116 13,337 
Port Orchard Bay, WA3 Completed 1928 42,804 - 
Shilshole Bay, Seattle, WA Completed 1962 2,575,09117 - 
Skagit River, WA Completed 1950 102,33018 36,258 
Westhaven Cove Small Boat 
Basin, WA1 Completed 1981 2,000,00019 - 
'Authorized by Chief of Engineers under authority of Section 
107, Public Law 86-645. 
2Maintenance by Port of Port Angeles. 
3No maintenance required. 
4Excludes $457,200 contributed funds expended. 
5Excludes $2,500 Coast Guard funds expended. 
6Excludes $1,570,886 contributed funds expended. 
Includes $40,790 appropriated and expended for WA State 
Sales and Use Tax, FY 85. 
7Includes $8,005 expended for previous project. Excludes 
$50,000 expended by State of Washington in fulfilling terms of 
local cooperation. 
"Excludes $2,184,766 contributed funds expended. 
9Excludes $396,000 contributed funds expended. 
10Excludes $131,275 contributed funds expended. 
1'Includes $43,037 expended for previous project. Excludes 
$1,267 881 contributed funds expended. 
12Excludes $390,753 contributed funds and $3,000 Coast 
Guard funds expended. 
13Mitigation shore damages study expended. 
14Excludes $28,288 contributed funds and $9,000 Coast 
Guard funds expended. 
15Includes $34,352 appropriated and expended for WA 
State Sales and Use Tax, FY 85. 
'6Excludes $21,260 contributed funds expended. 
17Excludes $15,000 Coast Guard funds expended. 
"'Includes $2,500 expended for previous project. 
19Excludes $1,230,035 contributed funds expended. 
38-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 38-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 1987 
Full Report Operation 
See Annual and 
Project Status Report For Construction Maintenance 
American Lake, Vicinity of Fort 
Lewis, WA' Completed 1957 59,5825 - 
Bear Creek, Flathead County 
Bridge, near Essex, MT2 Completed 1971 1,424 - 
Blackfoot River, Matt Little Road, MT2 Completed 1964 17,836 - 
Bogachiel River, Highway 101, 
near Forks, WA2 Completed 1981 156,000 - 
Bogachiel River, Undie Road, Forks, WA2 Completed 1981 57,000 - 
Cedar River, Renton, WA2 Completed 1949 32,264 - 
Chehalis River, City of Chehalis, 
Raw Water Pumphouse, WA2 Completed 1966 35,454 - 
Chehalis River, Independence Road, 
Thurston County, WA2 Completed 1965 47,916 - 
Chehalis River, Montesano, WA2 Completed 1977 140,080 - 
Clallam Bay, Sekiu, WA2 Completed 1977 48,698 - 
Clallam River, Highway 112, WA2 Completed 1981 43,500 - 
Clark Fork River, Drummond, MT2 Completed 1978 18,660 - 
Clark Fork River, Missoula, MT2 Completed 1978 31,548 - 
Clark Fork River, Superior, MT2 Completed 1971 28,356 - 
Clark Fork River, Vicinity of Plains, MT2 Completed 1950 27,947 - 
Clearwater River, Jefferson County Road, WA2 Completed 1968 50,0006 - 
Clearwater River, Queets River Bridge, WA2 Completed 1950 49,165 - 
Coeur d'Alene, Spokane River, ID Completed 1941 152,872 - 
Coeur d'Alene River, Springston, ID2 Completed 1950 25,452 - 
Columbia River Basin, Local Protection 
Projects, ID, MT, and WA: 
Clark Fork River, Missoula, MT Completed 1983 384,8627 - 
Lightning Creek, Clark Fork, ID Completed 1959 42,726 - 
Deschutes River, Gleason Road Bridge, 
near Thmwater, WA2 Completed 1965 26,292 - 
Deschutes River, Rich Road Bridge, 
near East Olympia, WA2 Completed 1967 22,956 - 
Dungeness River, Area #5, WA2 Completed 1950 2,1558 - 
Dungeness River, Area #8, WA2 Completed 1950 2,895 - 
Dungeness River, Clallam County, WA' Completed 1964 52,0409 - 
Dungeness River, Sequim, WA2 Completed 1981 99,000 - 
Dungeness River, Sequim, WA2 Completed 1986 47,500 - 
Dungeness River, Taylor Cut-off Road, WA2 Completed 1961 14,09310 - 
Elwha River, Clallam County, WA2 Completed 1951 17,303 - 
Entiat River, Chelan County, WA2 Completed 1978 38,000 - 
Flathead River, MT2 Completed 1972 20,940 - 
Flathead River, Bradley Channel Area, MT2 Completed 1955 26,265 - 
Flathead River, near Kalispell, MT2 Completed 1948 33,347 - 
38-26

SEATTLE, WASHINGTON DISTRICT 
TABLE 38-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 1987 
Full Report Operation 
See Annual and 
Project Status Report For Construction Maintenance 
Flathead River, near Kalispell, MT Deferred 1981 300,00011 - 
Flathead River, Old Steel Bridge, 
near Kalispell, MT2 Completed 1964 13,438 - 
Foster Creek Road, Douglas County, WA2 Completed 1962 50,000 - 
Green River between Kent and Auburn, WA 
and Allentown, WA2 Completed 1972 24,605 - 
Green River, State Highway 181, WA2 Completed 1976 27,001 - 
Henderson Bay, Purdy, WA2 Completed 1977 37,359 - 
Hoh River, County Road 16, WA2 Completed 1980 143,000 - 
Hoh River, U.S. Highway 101, WA2 Completed 1980 194,000 - 
Hoh River Road, Jefferson County, 
WA (HO 1360)2 Completed 1956 22,08212 
Hoh River Road, Jefferson County, 
WA (HO 1361)2 Completed 1961 11,916 - 
Hoh River Road, Jefferson County, 
WA (HO 1362)2 Completed 1964 41,622 - 
Hoh River, near Forks, WA2 Completed 1983 173,00013 - 
Hoko River, Sekiu, WA2 p Completed 1977 21,083 - 
Hood Canal, Hoodsport, WA2 Completed 1977 59,812 - 
Hoquiam River, WA2 Completed 1977 52,600 - 
Kootenai River, Bonners Ferry, ID2 Completed 1950 42,325 - 
Kootenai River, Kootenai Flats Area, 
District #1, ID2 Completed 1965 14,885 - 
La Conner, Swinomish Channel, WA2 Completed 1979 40,525 - 
Methow River, WA (MET 1-74)2 Completed 1974 15,700 - 
Methow River, WA (MET 2-74)2 Completed 1974 11,200 - 
Methow River, WA (MET 3-74)2 Completed 1974 13,450 - 
Methow River, Barclay Canal, WA2 Completed 1976 19,810 - 
Methow River, State Highway No. 16 Bridge, 
Twisp, WA2 Completed 1949 31,783 - 
Methow River, Twisp-Carlton Highway, 
Vicinity of Twisp, WA2 Completed 1951 33,200 - 
Methow River, Vicinity of Pateros, WA2 Completed 1951 11,72614 - 
Middle Fork Nooksack River, 
Deming, WA2 Completed 1986 79,000 - 
Mineral Creek, Lewis County, WA2 Completed 1972 11,836 - 
Moclips River, Moclips, WA2 Completed 1977 17,608 - 
Naches River, Naches, WA2 Completed 1982 59,000 - 
Newaukum River, Lewis County, 
Hamilton, WA2 Completed 1972 24,792 - 
Nisqually River, near Elbe, WA2 Completed 1948 37,636 - 
Nisqually River, Thurston County, WA2 Completed 1960 26,790 - 
Nisqually River, Vicinity of Elbe, WA2 Completed 1952 19,445 - 
Nooksack River, Acme, WA2 Completed 1985 77,300 - 
Nooksack River, Guide Bridge 
Location, WA2 Completed 1950 6,07515 
Nooksack River, above Highway 1Z 
Bridge, WA2 Completed 1960 10,807 - 
North Fork Skykomish River, WA2 Completed 1981 222,500 - 
38-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 38-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
Project 
Okanogan River, WA2 
Okanogan River, Omak, WA 1 
Okanogan River, Oroville, WA1 
Pilchuck River, WA 
Pilchuck River, WA2 
Pilchuck River, Everett, WA2 
Pilchuck River, State Highway 92, 
Granite Falls, WA2 
Placer Creek, ID 
Powell County High School, Deer Lodge, MT2 
Pysht River, Sekiu, WA2 
Queets River, Jefferson County 
Sewage Lagoon, WA2 
Quillayute River, Quileute TIibal Float 
and Bridge, WA2 
Quinalt River, Grays Harbor, WA2 
Quinalt River Road, Jefferson County, WA2 
Rock Creek, Granite County, MT2 
Rock Creek, Missoula County, MT2 
Rock Creek Road, MT2 
Rye Creek, MT2 
St. Maries, St. Joe River, ID 
Sammamish River, WA 
Sauk River, WA2 
Sewage Treatment Plant, Missoula, MT2 
Shelton Creek, WA' 
Skagit Creek, WA 
(Avon Bypass) 
Skagit River, WA (Levee and 
Channel Improvements) 
Skagit River at Burlington Bend, WA2 
Skagit River, Cape Horn Road, WA2 
Skagit River, Deadman's Slough, WA2 
Skagit River, Pressentin Creek, WA2 
Skagit River, South Skagit Highway, WA2 
Skagit River, South Skagit Highway, 
WA (Job 66-1)2 
Skagit River, South Skagit Highway, 
WA (Job 67-1)2 
Snohomish River, Lowell- 
Snohomish River Road, WA2 
Snohomish River, Snohomish, WA2 
Snoqualmie River, West Snoqualmie, WA2 
Soleduck River Bridge, WA2 
Soleduck River, near Mora Road Bridge, WA2 
Startup, Skykomish and Wallace Rivers, WA' 
Status 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Deferred 
Inactive 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
I----~--- 
38-28 
For Last 
Full Report 
See Annual 
Report For 
1974 
1981 
1982 
1985 
1971 
1980 
1971 
1986 
1964 
1977 
1981 
1972 
1981 
1961 
1974 
1973 
1980 
1973 
1942 
1967 
1974 
1965 
1979 
1968 
1982 
1949 
1966 
1980 
1980 
1963 
1966 
1967 
1969 
1970 
1977 
1961 
1963 
1970 
Cost to Sep. 30, 1987 
Operation 
and 
Construction Maintenance 
10,100 - 
2,231,03016 
1,787,63017 
81,000 - 
10,713 - 
54,000 - 
30,973 - 
5,865,000 - 
11,291 - 
86,160 - 
125,000 - 
39,300 - 
208,000 - 
15,92818 
49,657 - 
31,565 - 
50,000 - 
22,819 - 
357,698 - 
2,582,53619 
20,860 - 
50,00020 
872,021 - 
54,46811 
1,934,792 - 
50,000 - 
46,489 - 
93,000 - 
137,000 - 
40,753 - 
17,719 - 
50,00021 
44,227 - 
60,90022 
15,565 - 
16,43623 
11,433 - 
271,713 -

SEATTLE, WASHINGTON DISTRICT 
TABLE 38-E OTHER AUTHORIZED FLOOD CONTROL PROJECTIS 
Project 
Stillaguamish River, South Fork, Mountain 
Loop Highway, near Robe, WA2 
Stillwater River, MT2 
Stillwater and Whitefish Rivers, MT2 
Strong Creek, Hope, ID2 
Tahola, WA2 
Upper Puyallup River, WA2 
Wenatchee Canyons 1 and 2, WA4 
West Fork Foster Creek, Wa2 
Willapa River at Raymond, WA 
Wynoochee River, County Road 141, WA2 
Wynoochee River, near Montesano, WA2 
Wynoochee River, near Montesano, 
WA (WR-1-72) 2 
Yakima, Yakima River, WA 
Yakima River, Cle Elum, WA2 
Yakima River, below mouth of Teanaway 
River, near Cle Elum, WA2 
Yakima River, West Richland, WA2 
Yakima River, Yakima, WA2 
Status 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Inactive 
Completed 
Inactive 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
For Last 
Full Report 
See Annual 
Report For 
1964 
1973 
1977 
1970 
1979 
1938 
1977 
1958 
1982 
1976 
1969 
1972 
1948 
1949 
1947 
1977 
1983 
Cost to Sep. 30, 1987 
Operation 
and 
Construction Maintenance 
50,00024 
17,457 
34,513 
8,442 
223,893 
71,49525 
544,331 
19,513 
508,13026 
111,072 
50,00027 
50,000 
381,961 
8,047 
48,272 
36,768 
125,500 
1Authorized by Chief of Engineers under authority of Section 
205, Public Law 858, 80th Congress, as amended. 
2Authorized by Chief of Engineers under authority of Section 
14, Public Law 526, 79th Congress, as amended. 
3Authorized by Works Progress Administration Project 
No. OP 65-93-917. 
4Authorized by Secretary of Army under authority of Section 
201, Public Law 298, 89th Congress, H. Doc. 91-370. 
5Excludes $10,000 contributed funds expended. 
6Excludes $24,728 contributed funds expended. 
7Includes $20,580 preconstruction planning cost and 
$7,850 appropriated and expended for recreation facilities at 
completed project (Code 710). Excludes $13,500 contributed 
funds expended. 
8Excludes $2,154 contributed funds expended. 
9Excludes $340,066 Public Works Acceleration Act funds 
expended. 1 0Excludes $3,314 contributed funds expended. 11Preconstruction planning only. 
12Excludes $21,807 contributed funds expended. 13Excludes $189,000 Federal Highway Administration 
funds expended. 
14Excludes $11,726 contributed funds expended. 
15Excludes $6,075 contributed funds expended. 
16Includes $1,030 appropriated and expended for WA State 
Sales and Use Tax, FY 85. 
17Includes $8,130 appropriated and expended for WA State 
Sales and Use Tax, FY 85. 
l8Excludes $4,843 contributed funds expended. 
19Excludes $696,923 contributed funds expended. Includes 
$117,420 preconstruction planning cost. 
20Excludes $5,339 contributed funds expended. 
21Excludes $24,488 contributed funds expended. 
22Excludes 14,307 contributed funds expended. 
23Excludes $1,960 contributed funds expended. 
24Excludes $46,182 contributed funds expended. 25Emergency Relief Funds, Works Progress Administration. 
Excludes $13,704 contributed funds expended. 26Includes $23,742 preconstruction planning cost and 
$8,888 expended for restudy, FY 1967-1972. 
27Excludes $21,311 contributed funds expended. 
38-29 
__ __ 
1 _

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 38-F OTHER AUTHORIZED MULTIPLE PURPOSE 
PROJECTS, INCLUDING POWER 
For Last 
Full Report 
See Annual 
Project Report For 
Cost to Sep. 30, 1987 
Construction 
Operation and 
Maintenance 
Priest Rapids Dam, Columbia River, WA 1954 350,0001 
'For partnership planning. Excludes funds expended for 544 83d Congress. Project constructed by Grant County Public 
acquisition of lands under partnership arrangement for Priest Utility District. 
Rapids and Wanapum Dams, in accordance with Public Law 
TABLE 38-G DEAUTHORIZED PROJECTS 
Date 
Deauthorized 
Federal 
Funds 
Expended 
Contributed 
Funds 
Expended 
Columbia River Basin, Local 
Protection Projects, ID, MT, 
and WA: 
Crab and Wilson Creeks, WA 
Entiat River, WA 
Methow River, WA 
Okanagon River, WA 
St. Regis River, MT 
Wenatchee River, WA 
Yakima River at Ellensburg, WA 
Hammersley Inlet, WA 
(Uncompleted Portion) 
Port Angeles Harbor, WA 
(Uncompleted Portion) 
Port Gamble Harbor, WA 
(Uncompleted Portion) 
Quillayute River, WA 
(Uncompleted Portion) 
Seattle Harbor, WA 
(Uncompleted Portion) 
Skagit River, WA 
(Uncompleted Portion) 
Spokane River, Spokane, WA 
Stillaguamish River, WA 
1Preconstruction planning only. 
2Includes $14,300 expended for restudy, FY 1970. 
3Economic study only. 
38-30 
Project 
For Last 
Full Report 
See Annual 
Report 
1958 
1958 
1958 
1958 
1958 
1958 
1980 
1950 
1960 
1953 
1986 
1986 
1950 
1939 
1946 
1964 
1986 
1986 
1986 
1978 
1978 
1986 
1978 
1977 
1977 
1986 
1986 
1978 
1986 
1986 
$ 9,0001 
1,1001 
1,4001 
44,3002 
2,9441 
4,2343 
_ __ 
I - - 
-- 
--

SEATTLE, WASHINGTON DISTRICT 
TABLE 38-H LAKE WASHINGTON SHIP CANAL, WA 
PRINCIPAL FEATURES OF DOUBLE LOCK AND DAM 
(See Section 8) 
Section Large Lock Small Lock 
Miles above mouth 11/ 1 
Clear width of chamber Feet 80 28 
Maximum available length Feet 760 123 
Lift Feet 26 26 
Depth on upper miter sill' Feet 331/2 16 
Depth on intermediate miter sill2 Feet 29 - 
Depth on lower miter sill2 Feet 29 16 
Character of foundation Clay Clay 
Kind of dam Fixed dam with Fixed dam with 
gated spillway. gated spillway. 
Type of construction Concrete Concrete 
Year completed 1916 1916 
Cost 3 3 
'Low water in upper pool. 3Cost of double lock and dam was $2,224,712 and the 
2Mean lower low water in Puget Sound. emergency gates, completed in 1923, $174,693. 
TABLE 38-I PROJECT CONDITION SURVEYS 
(See Section 12) 
Name of Project Date Survey Conducted 
Washington: 
Anacortes Harbor 
Hoquiam River 
Kenmore Navigation Channel 
Lake Crockett 
Olympia Harbor (East Bay) 
Tacoma Harbor 
Willapa Harbor 
July 1987 
September 1987 
January 1987 
June 1987 
September 1987 
August 1987 
August 1987 
38-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 38-J FLOOD CONTROL ACTIVITIES 
PURSUANT TO SECTION 205, 
PUBLIC LAW 858, 80TH CONGRESS, AS AMENDED 
(PREAUTHORIZATION) 
Study Identification Fiscal Year Costs (1987) 
Bowman Hilton Mobile Home Park, WA 1 
Cedar River, WA 
Clear & Clarks Creeks, Pierce County, WA 
Davis Creek, Almira, WA2 
Dungeness River, Sequim, WA 
Ellensburg, WA2 
Issaquah Creek, Issaquah, WA 
Nooksack River, Everson, WA 
Omak, WA2 
Prairie Creek, Pierce County, WA 
Snohomish River, Ebey Island, WA 
Swamp Creek, Brewster, WA2 
Toppenish/Simcoe Creek, Yakima Indian Nation, WA 
Upper Green River, King County, WA2 
Yakima River, Richland, WA 
1Study terminated. 
2Unfavorable appraisal. 
TABLE 38-K EMERGENCY FLOOD CONTROL ACTIVITIES 
REPAIR, FLOOD FIGHTING, AND RESCUE WORK 
(PUBLIC LAW 99, 84TH CONG., AND ANTECEDENT LEGISLATION) 
Project and Location 
Disaster Preparedness 
Emergency Operations 
Rehabilitation1 
TOTAL 
Fiscal Year Costs (1987) 
$274,621 
84,360 
267,722 
$626,703 
1Excludes $40,000 contributed funds expended. 
38-32 
$ 276 
13,341 
50,664 
7,500 
7,149 
7,500 
7,472 
14,483 
7,500 
4,573 
9,620 
7,500 
49,985 
7,500 
1,500 
$196,563 
_ I~

WALLA WALLA, WA, DISTRICT * 
This District consists of all Columbia River drainage 
and tributaries thereto between the head of the 
McNary pool (River Mile 345.4) and the Umatilla 
Bridge (River Mile 290.5) below McNary Dam, except 
the Yakima River Basin above the Van Giesen Street 
Bridge (River Mile 8.4) near Richland, WA. 
IMPROVEMENTS 
Navigation 
1. Navigation Work Under 
Special Authorization ................... 
Flood Control 
2. Columbia River Basin, Local 
Flood Protection Projects ................ 
3. Catherine Creek, OR .................... 
4. Clear & Burnt River, OR ................. 
5. Colfax, Palouse River, WA ............. 
6. Flood Control Work 
Under Special Authorization .......... 
7. Inspection of Completed Flood 
Control Projects ......................... 
8. Inspection of Completed PL-99 Works .... 
9. Lucky Peak Lake, ID .................... 
10. Mill Creek Lake, WA .................... 
11. Owyhee River, OR ....................... 
12. Scheduling Flood Control 
Reservoir Operations .................... 
Multiple-Purpose Projects, 
Including Power 
13. Dworshak Dam and Reservoir, ID ....... 
14. Ice Harbor Lock and Dam- 
Lake Sacajawea, WA .................... 
15. Lewiston-Clarkston Bridge, 
ID and WA .............................. 
16. Little Goose Lock and Dam-- 
Lake Bryan, WA ....................... 
17. Lower Granite Lock and Dam, WA ...... 
18. Lower Monumental Lock and 
Dam--Lake Herbert G. West, WA ........ 
19. Lower Snake River Fish & Wildlife 
Compensation Plan, WA, OR, ID ......... 
Page 
20. McNary Lock and Dam--Lake Wallula, 
39-2 OR and WA ........................... 
21. Snake River Downstream from Johnson 
Bar Landing, OR, WA and Id ......... 
39-2 General Investigations 
39-2 22. Surveys ............................... 
39-2 23. Collection and Study of Basic Data ...... 
39-2 24. Preconstruction, Engineering 
and Design ............................ 
39-2 
39-2 
39-3 Tables 
Page 
39-6 
39-7 
39-7 
39-7 
39-8 
39-3 Table 39-A Cost & Financial Statement ... 39-9 
39-3 Table 39-B Authorizing Legislation ...... 39-11 
39-3 Table 39-C Other Authorized Navigation 
Projects ................... 39-14 
39-3 Table 39-D Not Applicable........... 
Table 39-E Other Authorized Flood Control 
Projects ...................... 39-14 
Table 39-F Not Applicable........... 
39-4 Table 39-G Deauthorized Projects ......... 39-15 
Table 39-H Columbia River Basin, Local 
39-4 Flood Control Projects ....... 39-15 
Table 39-I Inspection of Completed Flood 
39-5 Control Projects ............ 39-16 
Table 39-J Principal Data Concerning 
39-5 Navigation Lock, Spillway Dam, 
39-5 Powerplant and 
Impoundment ............... 39-16 
39-6 Table 39-K Snake River Downstream from 
Johnson Bar Landing, Or, WA 
39-6 and Id .................... 39-21 
39-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Navigation 
1. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION 
Navigation activities pursuant to Section 107, 
Public Law 86-645 (preauthorization). 
Fiscal year costs were $1,407 for Clearwater River, 
Lewiston, ID draft detail project report. 
Flood Control 
2. COLUMBIA RIVER BASIN, LOCAL FLOOD 
PROTECTION PROJECTS. 
Location. Improvements included in this project are 
along Columbia River and its tributaries. 
Existing project. Flood Control Act of 1950 
approved a general comprehensive plan for Columbia 
River Basin for flood control and other purposes based 
on plans in H. Doc. 531, 81st Cong., 2d Sess., and authorized 
$75 million to be appropriated for partial accomplishment 
of certain projects. Of that authorization, an 
amount not to exceed $15 million was allotted for construction 
of local flood protection works throughout 
Columbia River Basin, subject to conditions that all 
work undertaken pursuant to authorization should be 
economically justified prior to construction, and local 
cooperation specified in 1936 Flood Control Act, as 
amended, should be required. (See Tables 39-B and 39-H 
for projects in Walla Walla District.) 
Local cooperation. Section 3, Flood Control Act of 
June 22, 1936, applies. 
Operations during fiscal year. No projects were 
recommended for deauthorization during the fiscal year. 
3. CATHERINE CREEK, OR 
Location. Catherine Creek is a tributary to the 
Grande Ronde River located 8 miles east of the city of La 
Grande, Union County, Or. 
Existing project. Organic debris such as fallen trees, 
brush, and a select number of large cottonwood trees 
were removed from the creek to increase its capacity to 
convey future floods. The work was funded under 
authority of Section 208 of the Flood Control Act of 1954. 
Local cooperation. The Catherine Creek Corridor 
Improvement District sponsored the project and complied 
with requirements as set forth in Section 3 of the 
Flood Control Act of 1936 plus additional requirements 
set forth in the project document. 
Operations during fiscal year. None. 
4. CLEAR & BURNT RIVER, OR 
Location. At the city of Huntington waste water 
lagoon, Malheur County, Oregon. 
Existing project. Place 800 feet of rip rap along three 
cells of the lagoon system under authority of Section 14 
of the 1946 flood control act. 
Local Cooperation. City of Huntington sponsored 
the project and agreed to sponsorship requirements. 
Operations during fiscal year: None. 
5. COLFAX, PALOUSE RIVER, WA 
Location. On the main stem North and South Forks 
of the Palouse River and includes a portion of Spring 
Flat Creek, a tributary stream, all within the city of 
Colfax, WA. 
Existing project. Project consists of 3740 feet of concrete 
lined channel, 4910 feet of revetted channel, and 
2330 feet of unrevetted channel and drainage structures. 
Authorizing legislation was provided under PL 78-534, 
Section 10, Flood Control Act of 1944. 
Local cooperation. The city of Colfax has provided 
the necessary right of way and other sponsorship 
requirements. 
Operations during fiscal year. None. 
6. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to Section 205, 
Public Law 858, 80th Congress, as amended. 
Fiscal year costs were $10,589 for preauthorization 
studies: $16,757, Oakley Westside Channel, ID; $3,181, 
Salmon River, Vicinity of Salmon, ID. 
Emergency flood control activities-repair, 
flood fighting, and rescue work (Public Law 99, 
84th Congress, and antecedent legislation). 
Federal costs for fiscal year were $82,155 for disaster 
preparedness, $368,037 for emergency operations, 
$2,296,013 for rehabilitation. 
Emergency Bank Protection (Section 14, 1946 
Flood Control Act, Public Law 526, 79th 
Congress) 
Fiscal year costs were $18,500 for preauthorization 
studies: $12,414, Pocatello Creek, Bannock County, ID; 
$35,526, Burnt River, Baker County, OR. 
Snagging and clearing of navigable streams 
and tributaries in interest of flood control (Section 
208,1954 Flood Control Act, Public Law 780, 
83d Congress). 
Fiscal year costs were $32,653 for preauthorization 
studies and $265, Catherine Creek, Union County, OR; 
$26,802, Owyhee River, Malheur County, OR, for snagging 
and clearing operations. 
7. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Federal law requires local interests to maintain and 
operate completed local protection projects in accordance 
with regulations prescribed by Secretary of Army. 
Inspections were made to determine extent of compliance 
and to advise local interests as necessary of 
measures required to correct deficiencies. Work to investigate 
the geological and seismological conditions at 
Ririe Dam, ID continued through the fiscal year. See 
Table 39-I for inspections made during fiscal year. 
Fiscal year costs were $335,555. Total costs to September 
30, 1987 have been $2,094,921. 
39-2

WALLA WALLA, WASHINGTON DISTRICT 
8. INSPECTION OF COMPLETED PL-99 
WORKS 
Inspections are pursuant to Public Law 84-99 which 
directs the Corps to establish through inspection 
whether non-federal flood control works will continue to 
provide the intended degree of flood protection and to 
determine if the maintenance program is adequate. FY 
1987 costs for this program were $162,705. 
9. LUCKY PEAK LAKE, ID 
Location. On Boise River in southwestern Idaho about 
10 miles southeast of city of Boise. 
Existing project. A rolled-earthfill dam about 250 
feet high above streambed and 1,700 feet long at crest, 
with a lake providing a total storage at upper operating 
lake level of 306,000 acre-feet. (For further details see 
page 2000 of Annual report for 1962.) 
Construction of existing project was initiated 
November 1949 and completed June 1961. A feasible 
method of achieving better flood control through diversion 
into New York Canal, through Lake Lowell, and 
into the Snake River was developed but rejected by local 
interests due to the projected infrequent use of this diversion 
method. Since 1961, $118,468,600 in potential flood 
damages have been prevented by the project. Final 
Environmental Impact Statement on the initial project 
was filed with the Council on Environmental Quality on 
November 29, 1976. A revised draft Environmental 
Impact Statement for the modification work was filed 
with the Council on Environmental Quality on September 
18, 1978. 
During the detailed investigation of outlet capacity 
and the potential for adding hydropower to the existing 
project, a need for an auxiliary outlet became apparent. 
Construction of an auxiliary outlet was authorized on 
the Water Resource Development Act of 1976. In FY 
1978, an "Interim Feasibility Report on Modification of 
Lucky Peak Dam and Lake" (power facilities) was submitted 
to the Board of Engineers for Rivers and Harbors 
and approved. States, agencies, and the Chief of Engineers 
have commented on the report to the Secretary of 
the Army. The report was forwarded to the Office of 
Management and Budget in February 1982. 
A license to construct and operate power facilities at 
the project was issued by the Federal Energy Regulatory 
Commission (Project #2832) to the Boise Project Board of 
Control on June 10, 1980 and modified on October 9, 1980 
and 1982. Construction of the auxiliary outlet facility 
began in May 1984 and was completed in August 1986. 
Construction of modifications to the existing outlet tunnel 
and powerhouse excavation began in August 1986 
and was completed January 1987. Powerhouse general 
contract construction began in April 1986. The project is 
scheduled for completion in April 1988. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: A 
contract to repair outlet gates was completed in FY 1987. 
10. MILL CREEK LAKE, WA 
Location. In and upstream from Walla Walla, WA, on 
Mill Creek, a tributary of Walla Walla River. 
Existing project. Off-stream earthfill storage dam 
about 145 feet high and 3,200 feet long at the crest, two 
concrete-lined outlet channels, an earthfill diversion 
dam, and division structures. 
Authorizing legislation to provide a channel through 
the city of Walla Walla was added to the project in 1941. 
Federal cost of original project was $2,162,155. Adding 
recreation facilities has thus far increased project costs 
by $96,340 to $2,258,495. Not included in that cost is 
$80,000 contributed by local interests toward construction 
of the channel through Walla Walla. (For further 
details see page 2005 of Annual Report for 1962.) 
Construction of dam and appurtenant works was 
completed in 1942. Paving of channel through city of 
Walla Walla was completed in 1948. Park and recreation 
facilities were opened to the public July 1, 1964. Since 
1942, $5,424,000 in potential flood damages have been 
prevented by the combined storage and channel operation. 
Final Environmental Impact Statement was filed 
with the Council on Environmental Quality on 
December 12, 1975. 
The rehabilitation of the existing project was designed 
to correct the seepage and internal erosion which have 
occurred during each subsequent filling of the reservoir 
requiring limited flood control use of the project. 
Local cooperation. Fully complied with. For details 
see page 2006 of Annual Report for 1962. 
Operations during fiscal year. Major rehabilitation: 
all major rehabilitation work completed in FY 1987. 
Maintenance: Routine maintenance by Government 
forces continued, which included regulation of water 
control structures and care of recreation areas. 
11. OWYHEE RIVER, OR 
Location. The lower 12 miles of the Owyhee River 
from the junction with the Snake River, upstream 23 
miles to the Owyhee River diversion dam, Malheur 
County, OR. 
Existing project. Remove organic debris and gravels 
from the lower 12 miles of the Owyhee River under 
the authority of Section 208 of the 1954 Flood Control 
Act. 
Local cooperation. The Owyhee River Water Control 
District sponsored the project and agreed to sponsorship 
requirements. 
Operations during fiscal year. Work was completed 
in FY 1987. 
12. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Functional regulation of non-Corps projects was 
accomplished under several authorities. Regulations of 
Palisades, Little Wood, and Anderson Ranch Reservoirs 
in Idaho, and Bully Creek, Warm Springs, Agency Valley, 
and Mason Reservoirs in Oregon, was accomplished 
as authorized under Section 7, Flood Control Act of 1944, 
and coordinated with the Bureau of Reclamation. 
Flood control operations at Jackson Lake, Arrowrock 
Reservoir, and Lake Lowell were in accordance with 
formal agreements with the Bureau of Reclamation. 
Regulation of American Falls, Owyhee, Magic, Mackay, 
39-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Cascade, and Deadwood Reservoirs, Idaho, for flood 
control was accomplished under informal agreements. 
Brownlee, Oxbow, and Hells Canyon Reservoirs provided 
flood control regulation in accordance with provisions 
of the Federal Power Commission license to Idaho 
Power Company. 
Fiscal year costs were $105,990. 
Multiple-Purpose Projects, 
Including Power 
13. DWORSHAK DAM AND RESERVOIR, ID 
Location. Dam is on North Fork Clearwater River 1.9 
miles above its junction with Clearwater River, near 
Orofino, ID, and about 35 miles east of Lewiston, Id. 
Existing project. A straight concrete gravity dam 
about 717 feet in maximum structural height above 
foundation and 3,300 feet long at crest Elevation 1613. 
The reservoir has a gross storage capacity of 3,453,000 
acre-feet, of which 2,000,000 acre-feet are effective for 
both local and regional flood control, and for at-site and 
downstream power generation. In addition, the reservoir, 
extending 53 miles into a rugged and relatively 
inaccessible timberland, provides important transportation 
savings in connection with movements of marketable 
logs. The project also provides substantial recreation 
benefits. Powerhouse includes two 90,000 and one 
220,000 kilowatt generating units, with provisions for 
three additional 220,000 kilowatt units for an ultimate 
installed capacity of 1,060,000 kilowatts. Principal project 
data are set forth in Table 39-J. 
Fish passage at Dworshak Dam is not feasible due to 
the height of the dam. A hatchery has been built below 
the dam to assure continuance of anadromous fish runs. 
The reservoir area is habitat for elk, deer, and other 
wildlife. 
Construction of the project started April 1963 and was 
completed in 1986. Since the project became operational 
in June of 1972 it has prevented about $737,000 of potential 
flood damage. A reconnaissance report justifying 
the feasibility and cost benefits for the addition of a 
220,000-kilowatt fourth generating unit was completed 
in FY 1978. Environmental and economic studies on 
additional generating units have been curtailed due to 
public opposition. Units 4, 5, and 6 are now classified 
"inactive". 
Power generating Unit No. 1, 90,000-kilowatt capacity, 
was put in service March 1, 1973; Unit No. 2, also 
90,000-kilowatt capacity, began producing April 6, 1973; 
.Unit No. 3, 220,000-kilowatt capacity, went on the line 
April 20, 1973. Power generation through September 
1987 has been 25.61 billion kilowatt hours. 
Eighty mini-recreation sites have been established 
along the reservoir shoreline. Each site includes at least 
a picnic table, U.S. Forest Service-type fireplace, and 
chemical toilet. Some of the sites have several picnic 
tables. 
Dent Acres and Freeman Creek recreation sites are 
open to the public. Facilities consist of a boat launching 
ramp, boat docks, car-trailer parking, comfort stations, 
and fully developed overnight camping at each site. 
Local cooperation. None required. 
Operations during fiscal year. New work: Wildlife 
habitat browse continued on project lands to provide 
winter browse for elk and deer. Hatchery operations 
continue to be impaired by IHN virus. Steelhead eggs 
have been transferred to Kooskia National Fish 
Hatchery for incubation and early rearing of fry to a 
point past their normal period of susceptibility. In spring 
of 1987, 2,106,000 steelhead smolts weighing approximately 
380,000 pounds were released. In addition to 
steelhead, the hatchery also released 1,711,000 spring 
chinook smolts (93,000 pounds), 252,000 spring chinook 
fingerlings (1,000 pounds) and 174,000 rainbow trout 
(5,100 pounds). Rainbow trout production is also hindered 
by the IHN virus and fish were acquired from 
Hagerman National Fish Hatchery and Grace State 
(Idaho) Fish Hatchery. A return of 9,000 adult steelhead 
from previous years juvenile steelhead releases is 
expected in 1987. 
14. ICE HARBOR LOCK AND DAM-LAKE 
SACAJAWEA, WA 
Location. On Snake River, 9.7 miles above river 
mouth at head of Lake Wallula and 12 miles east of 
Pasco, WA. 
Existing project. The project includes a dam, powerplant, 
navigation lock, fish ladders, appurtenant facilities, 
and relocation of railroads. Project provides for 
navigation, hydroelectric power generation, recreation, 
and incidental irrigation. Reservoir has normal operating 
range between Elevations 440 and 437 mean sea 
level, and extends upstream about 31.9 miles, providing 
slack water to Lower Monumental Lock and Dam. 
Structure is about 2,790 feet long and about 130 feet high 
above streambed. 
Beginning at south end, project consists of a concrete 
nonoverflow section, concrete powerhouse, spillway 
dam navigation lock, and an earth and rockfill 
embankment at north abutment. Fish passing facilities, 
including two 90,000-kilowatt units and three 111,000- 
kilowatt units in operation. Spillway dam is 610 feet 
long, and overflow crest at Elevation 391 mean sea level 
is surmounted by 10 radial gates, 50 feet wide by 51 feet 
high, which provide the capacity to pass a design flood 
of 850,000 cubic feet per second. Deck is at Elevation 453 
mean sea level and provides a service road and track for 
a gantry crane. Navigation lock is single-lift type with 
clear plan dimensions of 86 by 675 feet and 15-foot minimum 
depth over the sills. A navigation channel 250 feet 
wide and 14 feet deep is provided from the mouth of the 
Snake River to the dam. Principal project data are set 
forth in Table 394. 
Construction started December 1955 and the project 
was placed in useful operation January 1962. The project 
is complete. 
An Environmental Impact Statement concerning 
power units 4 through 6 was filed with the Council on 
Environmental Quality August 1971. 
Power generation through September 1987 has been 
58.02 billion kilowatt hours. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: 
39-4

WALLA WALLA, WASHINGTON DISTRICT 
Normal operation and maintenance continued. Contracts 
awarded for thrust bearing repair and powerplant 
control. Contract awarded and completed for vertical 
barrier screens in connection with fish guiding efficiency 
(FGE) work. A total of 3,096,340 tons of cargo 
passed through the navigation lock during calendar 
year 1986. 
15. LEWISTON-CLARKSTON BRIDGE, ID 
AND WA 
Location. On the Snake River, River Mile 141.3, 1.7 
miles upstream of the existing interstate bridge connecting 
the towns of Lewiston, ID and Clarkston, WA. 
Existing project. The project consists of a new fixed 
high-level four lane highway bridge and approaches 
onU.S. Highway 12 across the Snake River constructed 
at a cost "not to exceed $21,000,000". In December 1981 
Congress authorized an additional expenditure of 
$2,200,000 for construction of Lewiston's North Ramp. 
An approach roadway from the bridge to 16th Avenue in 
Clarkston, WA was authorized in July 1983 at an additional 
expenditure of $800,000. 
Final Environmental Impact Statement Supplement 
was filed with the Council on Environmental Quality on 
July 16, 1979. 
Local cooperation. Non-Federal interests have provided 
without cost to the United States all lands, easements, 
and rights-of-way necessary for the construction 
of the bridge and its approaches, and after construction 
have agreed to own, operate toll free, and maintain the 
bridge and approach facilities. The non-Federal costs for 
land and relocation are $755,193. 
Operations during fiscal year. All work complete. 
16. LITTLE GOOSE LOCK AND DAM-LAKE 
BRYAN, WA 
Location. Dam is 70.3 miles above mhouth of Snake 
River at head of Lower Monumental Lake, about 40 
airline miles northerly of Walla Walla, WA, and 50 miles 
westerly of Lewiston, ID. 
Existing project. The project includes a dam, powerplant, 
navigation lock, fish ladder, and appurtenant 
facilities. Improvements provide navigation, hydroelectric 
power generation, recreation, and incidental 
irrigation. The reservoir has a normal operating range 
between Elevations 638 and 633 mean sea level. Lake 
Bryan extends upstream about 37.2 miles and provides 
slack water to Lower Granite Lock and Dam. Dam structure 
is 2,670 feet long and about 160 feet high above 
streambed and consists of a powerhouse, spillway dam, 
navigation lock, and necessary nonoverflow sections. 
Fish passage facilities include one ladder with entrances 
on both shores with a fish channel through the spillway 
which connects to the powerhouse fish collection system 
and south shore ladder. Powerhouse now has six 
135,000-kilowatt generating units for a capacity of 
810,000 kilowatts. Spillway dam can pass a design flood 
of 850,000 cubic feet per second. Navigation lock is 
single-lift type with clear plan dimensions of 86 by 675 
feet and a minimum depth of 15 feet over the sills. Relocations 
along the lake include 32 miles of Camas Prairie 
Railroad, 5.8 miles of county roads, 2.2 miles of state 
highways, and Central Ferry bridge. Principal project 
data are set forth in Table 39-J. 
A final Environmental Impact Statement was filed 
with the Council on Environmental Quality on January 
8, 1975. 
Power generation through September 1987 has been 
45.24 billion kilowatt hours. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: 
Normal operation and maintenance continued. Contract 
awarded for powerplant control. 
Work is continuing on the design for a permanent 
juvenile fish facility. 
A total of 2,629,261 tons of cargo passed through the 
navigation lock during calendar year 1986. 
17. LOWER GRANITE LOCK AND DAM, WA 
Location. At River Mile 107.5 on Snake River at head 
of Lake Bryan and about 33 miles downstream from 
Lewiston, ID. 
Existing project. The facility includes a dam, powerplant, 
navigation lock, fish ladder, and appurtenant 
facilities, and requires about 8 miles of backwater levees 
along Snake and Clearwater Rivers at Lewiston, ID. 
Benefits afforded by project include slack-water navigation, 
power generation, recreation, and incidental irrigation. 
Water surface at the dam varies between Elevations 
738 and 724 to maintain a normal operating range 
between Elevations 738 and 733 in the Lewiston, IDClarkston, 
WA area. Dam structure is about 3,200 feet 
long and about 146 feet high above streambed. Powerhouse 
now has six 135,000-kilowatt units. Spillway has a 
capacity for a design flood of 850,000 cubic feet per 
second. Navigation lock is a single-lift type (105 feet 
maximum) with clear plan dimensions of 86 by 675 feet 
and a minimum depth of 15 feet over the sills. Principal 
project data are set forth in Table 39-J. 
Construction started July 1965 and is complete. 
Acquisition of lands is also complete. Lake was filled 
February 15, 1975 and the first power generating unit 
went on the line April 15, 1975. Approximately 
$4,119,300 in potential flood damage has been prevented 
since the levees became functional. An Environmental 
Impact Statement was filed with the Council on Environmental 
Quality November 1971. A revised statement 
to include the additional units was filed with the Council 
on Environmental Quality on July 23, 1975. 
Power generation through September 1987 has been 
36.20 billion kilowatt hours. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: 
Normal operation and maintenance continued. Contracts 
awarded and completed were dredging Port of 
Lewiston, Lewiston Water Intake, and ScreenDeflectors 
(fish guiding efficiency). Also awarded contracts for 
powerplant control and rockfall repair. 
As the first juvenile fish collection point on the Snake 
River, ower Granite is a primary component in the 
District's Juvenile Fish Transport Program. This program 
was begun because construction of eight dams on 
39-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
the Columbia and Snake Rivers has had a significant 
impact on the survival during downstream migration of 
juvenile anadromous fish such as salmon and steelhead 
trout. Since the early 1960's, efforts to mitigate the 
adverse impacts have included extensive research, 
structural modifications of the dams, installation of turbine 
screening systems, and implementation of a system 
for collecting and transporting juvenile fish. 
The Walla Walla District operates the Juvenile Fish 
Transportation Program for the Columbia-Snake system. 
Three primary collection points have been established 
at Lower Granite, Little Goose and McNary dams, 
with fish sorting and handling facilities. Smolts collected 
at these facilities are taken by specially designed 
barges and trucks to an area downstream of Bonneville 
Dam and released to make the rest of their journey to the 
sea. In 1987 a total of just over 17,000,000 juvenile fish 
were transported. Increased hatchery production and 
improved fish guiding efficiency (FGE) have resulted in 
increased numbers of fish to be transported. 
A total of 1,822,154 tons of cargo passed through the 
navigation lock during calendar year 1986. 
18. LOWER MONUMENTAL LOCK AND DAMLAKE 
HERBERT G. WEST, WA. 
Location. On Snake River at head of Lake Sacajawea, 
about 45 miles northeast of Pasco, WA, and 41.6 
miles above river mouth. 
Existing project. The facility includes a dam, powerplant, 
fish ladders, navigation lock, appurtenant facilities, 
and relocated railroads and highways. The project 
functions include navigation, hydroelectric power 
generation, recreation and irrigation. Reservoir has 
normal operating range between Elevations 540 and 
537. The lake extends about 28.7 miles upstream to Little 
Goose Lock and Dam. The dam is concrete gravity type 
with earthfill and rockfill abutments. It is 3,800 feet long 
including abutments, spillway, navigation lock, and 
powerhouse, and is about 135 feet high above streambed. 
There are two fish ladders, one at each end of the dam. 
Powerhouse has six 135,000-kilowatt units for a total 
capacity of 810,000 kilowatts. Spillway is 508 feet long, 
and overflow crest at Elevation 483 feet above mean sea 
level is surmounted by 8 radial gates, each 50 feet wide 
and 61 feet high. Deck is at Elevation 553 feet and provides 
a service road and track for a gantry crane. Navigation 
lock is single-lift type, with lock chamber 86 by 
675 feet and minimum depth of 15 feet over the sills. 
Principal project data are set forth in Table 39-J. 
Construction began June 1961, and the project was 
opened to navigation April 1969. The project is complete. 
A final Environmental Impact Statement was filed 
with the Council on Environmental Quality on May 21, 
1976. 
Power generation through September 1987 has been 
48.99 billion kilowatt hours. 
Local cooperation. None 
Operations during fiscal year. Maintenance: 
Normal operation and maintenance continued. Contracts 
awarded for thrust bearing repair, powerplant 
control, and Unit 2 repair. Cargoes totaling 2,723,880 
tons passed through the navigation lock during 
calendar year 1986. 
19. LOWER SNAKE RIVER FISH & 
WILDLIFE COMPENSATION PLAN, WA, 
OR, ID 
Location. At various locations within the Columbia 
Snake River drainage in the States of Idaho, Oregon 
and Washington. 
Existing project. The project will consist of a series 
of fish hatcheries and wildlife development areas at 
sites to be selected. The project will compensate for loss 
of wildlife habitat and anadromous and resident fishery 
inundated as a result of construction of four multiple 
purpose dams and reservoirs on the Lower Snake River 
(Ice Harbor, Lower Monumental, Little Goose, Lower 
Granite). 
In 1980 the first release from the McCall, ID summer 
chinook hatchery was made, and the adult trapping 
facility which provides the fish egg supply for the 
McCall Hatchery became operational. 
The real estate design memorandum, and feature 
design memorandums on the McCall Hatchery, Hagerman 
Hatchery, Lookingglass Hatchery, Lyons Ferry 
Hatchery, Dworshak Hatchery Expansion, Irrigon 
Hatchery, Magic Valley Hatchery, Sawtooth Hatchery, 
East Fork Salmon River Satellite Facility, the off-project 
wildlife lands, and the site selection report have all been 
approved. A final Environmental Impact Statement 
was filed with Council on Environmental Quality on 
November 2, 1977. The Dworshak National Fish 
Hatchery, the Irrigon and Wallow Satellite Hatcheries, 
Hagerman Hatchery, Lyons Ferry Hatchery, Lookingglass 
Hatchery, McCall Hatchery, Sawtooth Hatchery 
and Magic Valley Hatchery are in operation. The compensation 
plan is 73 percent complete. 
Estimated Federal cost of the project is $185,000,000. 
Local cooperation. None required. 
Operations during fiscal year. New work: Construction 
contracts were awarded for: Corrective work at 
Sawtooth, Imnaha Satellite Hatchery, and water collection 
at Irrigon. Work was also underway at the Little 
Sheep Creek Satellite facility. The above contracts are 
scheduled for completion during FY 1988. The final 
hatchery site has been selected at Ahsahka, Idaho for 
the Clearwater River basin. This hatchery will rear both 
spring chinook and steelhead. Red River-Crooked River 
& Powell hatcheries have been identified as satellite 
sides for the Clearwater Hatchery. 
20. McNARY LOCK AND DAM-LAKE WALLULA, 
OR AND WA 
Location. On Columbia River 292 miles above 
mouth, near Umatilla, OR, and 3 miles above mouth of 
Umatilla River. 
Existing project. Includes a concrete dam 7,300 feet 
long overall and 183 feet high above streambed, powerplant 
with 14 power generating units, navigation lock, 
fishways, levees and pumping plants, incidental 
39-6

WALLA WALLA, WASHINGTON DISTRICT 
irrigation, and modification and relocation of railroad 
bridges over the Columbia and Snake Rivers in order to 
eliminate hazards to navigation. Principal project data 
are set forth in Table 39-J. 
Construction started May 1947 and is complete. 
Project placed on permanent operating basis and lake 
raised to Elevation 340 in November 1953. Except for 
maintenance interruptions, all 14 power units have been 
in commercial operation since February 1957. 
A final Environmental Impact Statement was filed 
with Council on Environmental Quality in June 1976. 
Power generation through September 1987 has been 
203.29 billion kilowatt hours. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: 
Normal operation and maintenance of project 
continued. Contract awarded for repair of powerhouse 
wall. Contracts continuing for repair to excitation equipment 
and stator replacement for unit 14. A total of 
5,893,825 tons of commodities passed through the navigation 
lock during calendar year 1986. 
21. SNAKE RIVER DOWNSTREAM FROM 
JOHNSON BAR LANDING, OR, WA AND ID 
Location. On Snake River downstream from Johnson 
Bar Landing, River Mile 230. Snake River, which is 
largest tributary of Columbia River, rises in Yellowstone 
National Park in western part of Wyoming, flows 
generally westerly for about 1,000 miles, and empties 
into Columbia River near Pasco, WA, 324 miles from 
Pacific Ocean. 
Existing project. The River and Harbor Act of 1945 
authorized construction of dams as necessary and open 
channel improvements for purposes of providing slackwater 
navigation and irrigation between mouth of 
Snake River and Lewiston, ID. That authorization modified 
previous authorizations only for that portion of 
improvement below Lewiston, ID. Acts of June 13, 1902, 
and August 30, 1935, as they pertain to open river 
improvement from Lewiston, ID, to Johnson Bar Landing, 
remain part of existing project. 
Improvements included in existing project are Ice 
Harbor Lock and Dam--Lake Sacajawea; Little Goose 
Lock and Dam-Lake Bryan; Lower Granite Lock and 
Dam; Lower Monumental Lock and Dam--Lake Herbert 
G. West; and open-river improvement, Lewiston to 
Johnson Bar Landing. Each of the four locks and dams 
is described in an individual report, and cost and financial 
data for the entire project are shown on Tables 39-A 
and 39-K. 
Ice Harbor, Lower Monumental, Little Goose and 
Lower Granite are in full operation. (See individual 
reports for details.) (For further details see Annual 
Reports, page 2246 for 1903; page 1986 for 1906; page 
1991 for 1915; and page 1981 for 1962.) 
Local cooperation. None required. 
Terminal facilities. On Snake River from the mouth 
to Johnson Bar Landing there are 18 privately owned 
barge terminals in use for shipping grain, petroleum 
products, fertilizers, cement, and other general cargo. 
There are also 5 marinas and 28 small-boat launching 
ramps, all open to public use. The facilities serve slackwater 
navigation to Snake River Mile 140, the site of 
Lewiston, ID. That slack-water reaches the Lewiston, 
ID-Clarkston, WA area since the lake behind Lower 
Granite Dam was filled in February 1975. 
Operations during fiscal year. See individual 
reports for Ice Harbor, Lower Monumental, Little Goose, 
and Lower Granite locks and dams. On Snake River 
from Lewiston, ID, to Johnson Bar Landing, reconnaissance 
and condition surveys were conducted and survey 
markers were maintained. 
General Investigations 
22. SURVEYS 
The Upper Snake River and Tributaries is the principal 
ongoing survey. The area covered by the study 
extends from the headwaters of the Snake River in 
Wyoming down to and including the Weiser River in 
Idaho. The potential for supplemental water storage, 
power generation, and streamflow augmentation to 
enhance fisheries, continues to be the primary focus. 
A survey study of the Mill Creek Basin continued in 
FY 1987. Mill Creek originates in the Blue Mountains in 
northern Oregon and southern Washington and is tributary 
to the Walla Walla River. Water resource problems 
and needs being investigated include municipal and 
industrial water supply, power generation, fish 
enhancement, flood control, and irrigation. 
The Columbia River and Tributaries is a survey study 
directed by the North Pacific Division in which the 
Walla Walla District is participating. A major activity of 
the CR&T study, the Regional Hydropower Assessment 
being performed in coordination with the Northwest 
Power Planning Council, was completed in FY 1987. 
Other work on the CR&T study involved preparation of 
basin summary reports, plan formulation information, 
and continued work on the Clearwater River Basin interim 
study. 
A survey study investigating the flooding problems 
associated with the rising water levels of Malheur Lake 
in Harney County, Oregon was completed in FY 1987. 
Five consecutive years of above normal runoff from the 
basin have raised the level of this closed basin lake 
above any historical record and caused great economic 
and social impacts on Harney County. Alternatives 
investigated included a canal from Malheur Lake that 
would discharge lake water into the South Fork of the 
Malheur River, relocations of transportation facilities 
and land exchange and/or buy out of private lands. 
Total cost of surveys during fiscal year was 
$1,040,883. That sum was expended for: flood control 
studies, $885,197; special studies including Soil Conservation 
Service, Bureau of Reclamation, River Basin and 
Regional Planning Commissions, Cooperation with 
States, $33,380 and Special Investigations and FERC 
Licensing Activities, $122,306. 
23. COLLECTION AND STUDY OF BASIC DATA 
During the fiscal year flood hazard data for a number 
39-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
of locations in the District were collected and analyzed. 
Flood information was provided to several Federal 
agencies, to the States of Idaho, Oregon, and Washington, 
to various cities and counties in those states, and to 
some private organizations. 
Total cost of collection and study of basic data during 
fiscal year was $99,746 which was expended for flood 
plain management services, $40,666 and technical services, 
$59,079. 
24. PRECONSTRUCTION, ENGINEERING 
AND DESIGN 
McNary Lock and Dam (Second Powerhouse), OR 
and WA 
McNary Second Powerhouse is a proposed addition 
on the south shore of McNary Lock and Dam on the 
Columbia River near Umatilla, OR. The project will 
increase the present 1127 megawatt generating capacity 
by an additional 742 megawatts. Provisions are 
included for compensation of negative impacts on fish 
and wildlife. The project is estimated to cost 
$667,000,000 at October 1, 1986 price levels. 
The General Design Memorandum Phase I was prepared 
under the Water Resource Development Act of 
1976, Public Law 94,587, and submitted to the Secretary 
of the Army on July 1, 1981. 
Studies were initiated in FY 1982 and continued 
through FY 1984 on the General Design Memorandum 
Phase II and the Powerhouse Preliminary Design 
Report. FY 1987 expenditures of $1,011 were spent on 
hydraulic model study by Waterway Experiment Station 
in Vicksburg, MS. There has been no further design 
activity on the project. The project was authorized for 
construction in the Water Resources Development Act of 
1986.
Zintel Canyon Dam, WA 
The proposed project consists of a roller compacted 
concrete dam 90 feet high with uncontrolled spillway 
and a fixed maximum release outlet works that would 
create a detention reservoir of 1,260 acre-feet of capacity. 
The storage comprises 860 acre-feet for flood control and 
400 acre-feet for sediment. In addition, the project also 
includes a conduit with a capacity of 580 cfs and a dike 
and floodgate across the Union Pacific Railroad to protect 
downtown Kennewick. The plan of improvement 
would provide protection against heavy rainfall, snowmelt, 
and thunderstorm floods to the city of Kennewick, 
WA. Estimated Federal project cost is $6,300,000. 
Reevaluation of the project was initiated to revise the 
General Design Memo No. 2 with fiscal year costs of 
$124,549. 
39-8

TABLE 39-A 
WALLA WALLA, WASHINGTON DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section 
In Text 
3. 
Project 
Catherine Creek, OR 
4. Clear & Burnt 
River, OR 
5. Colfax Palouse 
River, ID 
9. Lucky Peak Lake, 
ID 
10. Mill Creek Lake, 
WA 
11. Owyhee River, OR 
13. Dworshak Dam and 
Reservoir, ID 
14. Ice Harbor Lock 
and Dam, WA 
15. Lewiston-Clarkston 
Bridge, ID & WA 
16. Little Goose Lock 
and Dam, WA 
17. Lower Granite Lock 
and Dam, WA 
18. Lower Monumental 
Lock and Dam, 
WA 
II Funding FY 84 FY 85 FY 86 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost. 
Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
185,000 
107,968 
71,400 
839,000 
654,651 
27,894 
27,894 
317,200 
302,422 
1,775,000 
1,710,362 
7,500 
7,500 
3,081,100 
3,052,306 
4,527,800 
4,478,567 
200,106 
200,106 
4,004,900 
3,969,635 
640,000 
486,402 
1,000,500 
11 
5,436,056 
5,292,141 
394,800 
396,804 
5,249,400 
5,263,880 
3,98 
3,48' 
5,48 
5,36! 
12,932 
88,500 
63,974 
11,215 
1,101,999 
1,136,570 
2,500 616,000 
9,107 613,230 
1,043 2,517,000 
6,813 2,517,177 
- 68,000 
- 35,014 
3,000 50,000 
7,491 559,901 
1,000 5,446,000 
9,881 5,499,554 
49,004 
50,004 
4,168,629 
3,875,053 
80,000 
227,516 
55,995 
1,000,036 
4,338,143 
3,998,368 
74,689 
84,600 
5,706,000 
5,594,704 
4,868,671 
5,183,795 
6,210 
56,460 
3,921,401 
4,442,150 
8,890,205 
9,053,763 
-2,600 18,121 
-1,706 18,141 
38,000 
15,603 
68,000 
131,581 
71,400 
1,211,650 
1,358,698 
39-9 
-- -- 
301 
30' 
2,28 
2,34f 
Total to 
FY 87 Sep. 30, 1987 
-9,200 28,800 
265 28,800 
11,000 99,500 
35,526 99,500 
- 5,810,240 
2,236 810,240 
- 19,652,0811 
- 19,652,0811 
1,560,698 11,766,5512 
1,492,378 11,689,5922 
- 2,258,4953 
- 2,258,4953 
499,000 7,016,893 
494,044 6,997,329 
-90,000 17,705,607 
-89,857 17,704,628 
-6,184 69,316 
26,802 69,316 
- 329,523,2964 
1,250 329,509,2084 
6,027,728 54,615,5156 
5,985,953 54,427,958$ 
- 167,240,7576 
- 167,240,7576 
5,609,800 55,852,5747 
5,290,932 55,496,2027 
- 22,957,664 
- 22,957,664 
- 221,355,0228 
- 221,355,0228 
5,298,710 44,729,5059 
5,145,627 44,476,7959 
- 367,780,31510 
- 367,780,31310 
8,493,700 53,578,20211 
8,114,145 53,053,18311 
20,000 20,000 
20,000 20,000 
- 236,373,73212 
- 236,373,73212

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 39-A 
(Continued) 
COST AND FINANCIAL STATEMENT 
See 
Section 
In Text Project Funding FY 84 FY 85 FY 86 
Total to 
FY 87 Sep. 30, 1987 
19. Lower Snake Fish & 
Wildlife Compensation, 
ID, OR & WA 
(Contributed Funds) 
20. McNary Lock & 
Dam-Lake Wallula, 
OR & WA 
(Contributed Funds) 
21. Snake River Downstream 
from Johnson 
Bar Landing, 
OR, WA & ID 
Maint 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Contrib. 
Cost. 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
4,300,500 3,220,629 4,037,830 5,556,200 40,341,43213 
3,390,678 3,819,029 4,322,908 5,375,064 40,092,36813 
25,225,000 13,235,129 14,971,000 16,100,000 135,236,909 
25,024,768 12,989,270 15,096,848 16,303,537 135,109,829 
- 223,965 
- 223,965 
202,600 19,019 
203,380 19,242 
223,965 
223,965 
- 322,515,10514 
- 322,515,10514 
14,767,500 13,147,025 9,977,999 13,440,800 140,781,83515 
12,505,395 13,859,268 11,305,733 13,048,173 140,119,24915 
- 43,707 43,707 
43,707 43,707 
1,592,806 197,809 
1,595,240 209,206 
- 993,184,58916 
- 993,184,58716 
18,990,856 17,455,401 21,725,107 24,958,410 195,058,28817 
17,916,334 17,305,877 23,008,630 23,928,713 193,673,42217 
1Includes $570,831 appropriated and expended for Code 
710, Recreation Facilities at Completed Projects. 
2Includes $66,700 allotted and expended under Maintenance 
and Operation of Dams and Other Improvements of 
Navigable Waters. 
3Excludes $80,000 contributed funds, but includes $96,340 
appropriated and expended for Code 710, Recreation Facilities 
at Completed Projects. 
4Includes $2,046,100 regular project construction funds 
appropriated for and expended by Department of Interior in 
Fiscal Years 1969 through 1972 for hatchery operations. 
Includes $655,000 appropriated and expended for additional 
unit.
5Includes $15,734,980 regular project operation and maintenance 
funds expended by Department of Interior starting FY 
1972 for hatchery operations. FY 72-78 funds of $6,097,000 were 
charged to the project as a cost, but not as an expenditure for 
accounting purposes. Includes $36,700 allotted and expended 
under Special Recreation Use Fees. Includes $66,700 allotted 
and expended under Maintenance and Operation of Dams and 
Other Improvements of Navigable Waters. 
6Excludes $82,500 contributed for artificial spawning 
channel. Includes $36,748,021 appropriated and expended for 
additional units 4 through 6. Includes $914,256 appropriated 
and expended for Code 710, Recreation Facilities at Completed 
Projects. 
7Includes $48,500 allotted and expended under Special 
Recreation Use Fees; $641,063 appropriated and expended 
under Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters. 
Includes $60 941,807 appropriated and expended for 
addtional units 4 through 6. 
9Includes $621,063 appropriated and expended under 
Maintenance and Operation of Dams and Other Improvements 
of Navigable Waters. 
o0 
lncludes $46,212,534 appropriated and expended for 
additional units 4 through 6. Excludes $405,819 contributed 
funds on lock and dam project. Includes $63,800 appropriated 
and expended for Code 710, Recreation Facilities at Completed 
Projects. 
"Includes $338,163 appropriated and expended under 
Maintenance and Operation of Dams and Other Improvements 
of Navigable Waters. 
12Includes $51,661,371 appropriated and expended for 
additional units 4 through 6. 
13Includes $372,376 appropriated and expended under 
Maintenance and Operation of Dams and Other Improvements 
of Navigable Waters. 
14Includes $1,976,586 appropriated and expended for Code 
710, Recreation Facilities at Completed Projects. 
15Includes $45,800 allotted and expended under Special 
Recreation Use Fees and $1,035,860 allotted and expended 
under Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters. 
16Includes $400,150 for new work on previous projects 
(Pasco to Lewiston), and $34,613 for new work appropriation 
used for maintenance prior to 1953. Excludes $167,500 contributed 
funds for new work consisting of $82,500 for new work on 
existing projects (Pasco to Riparia), plus $82,500 for new work 
on existing artificial spawning channel. 
17Includes $186,570 appropriated and expended for maintenance 
on previous projects (Pasco to Lewiston) and $370,005 
appropriated and $368,304 expended open river Pasco to 
Lewiston and Lewiston to Johnson Bar Landing. 
39-10

TABLE 39-B 
WALLA WALLA, WASHINGTON DISTRICT 
AUTHORIZING LEGISLATION 
Date 
Authorizing 
Act Project and Work Authorized 
May 17, 1950 
COLUMBIA RIVER BASIN, LOCAL FLOOD 
PROTECTION PROJECTS 
Blackfoot Area, Snake River, ID. Levee left bank. 
Blackfoot River, ID. Levees, channel improvement, 
and rectification works. 
Boise Valley, Boise River, ID. Channel improvement 
and enlargement, levees, and revetments in Ada 
County. Canyon County unit was deauthorized 
April 18, 1967. Ada County unit was deauthorized 
in 1986. 
Camas Creek, ID. Channel deepening and 
rectification of a 20-mile reach of Camas Creek. 
Deauthorized in 1965. 
Gooding Area, Little Wood River, ID. Channel 
improvement. 
Grande Ronde Valley, OR. Levees and channel 
clearing, straightening and realignment; would 
complement stream regulation by upstream 
storage projects. Deauthorized in 1986. 
Heise Roberts Extension, Snake River, ID. Channel 
clearing and rectification, levees, and bank 
protection. Henrys Fork Unit deauthorized in 1986. 
Jackson Hole, Snake River, WY. Flood Protection. 
Kendrick, Potlatch River, ID. Revetted levee. 
Little Wood River, ID. Flood protection in immediate 
area. Deauthorized in 1965. 
Malheur River, OR. Channel rectification, levees, 
and bank protection at Vale. Willow Creek unit was 
deauthorized October 14, 1969. 
Palouse River, WA. Flood protection for urban and 
rural areas at Garfield and near Malden. Deauthorized 
in 1986. 
Payette Valley, ID. Channel rectification, levees, 
and bank protection along 38 miles of Payette 
River below Black Canyon Dam. Payette Valley 
was deauthorized October 3, 1978. 
Portneuf River and Marsh Creek, ID. Concrete-lined 
channel through Pocatello Inkom-Marsh Creek 
unit was deauthorized October 14, 1969. 
Shelley Area, Snake River, ID. Bank protection. 
South Fork Clearwater River, ID. Emergency 
Construction of levees and revetments. Deauthorized 
in 1986. 
Teton River, ID. Flood protection. Deauthorized in 
1986. 
Tomanovich-Salmon City, Salmon, ID. Channel 
improvement. 
Weiser River, Weiser Area, ID. Intermittent 
channel realignment and improvement, levees, and 
bank protection, lower river area. 
Whitebird Creek, ID. Flood protection. Deauthorized 
in 1986. 
CATHERINE CREEK, OR 
Organic debris removal along Catherine 
Creek. 
CLEAR & BURNT RIVER, OR 
Construction of riprap bank protection at city of 
Huntington waste water lagoon. 
COLFAX, PALOUSE RIVER, WA 
Provides for flood control works in vicinity of and 
through Colfax, WA, by channel enlargement and 
modification, levees, floodwalls, revetments, and 
modification of railroad bridges. 
39-11 
See 
Section 
In Text 
H. Doc 531, 81st 
Cong., 2nd Sess. 
Sec. 208, P.L. 83-780 
Authorized by Chief 
of Engineers 
Sep. 3, 1985 
Sec. 14, P.L. 79-526 
Authorized by Chief of 
Engineers July 10, 1985 
Flood Control Act 
of 1944 
H. Doc 888, 77th 
Cong., 2nd Sess. 
Documents 
3. 
4. 
5. 
Sep. 24, 1954 
July 24, 1946 
Dec. 22, 1944

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 39-B 
(Continued) 
AUTHORIZING LEGISLATION 
Date 
Authorizing 
Act Project and Work Authorized 
July 24, 1946 
Oct. 22, 1976 
Dec. 22, 1944 
as amended 
June 28, 1938 
Aug. 18, 1941 
Sep. 24, 1954 
as amended 
July 3, 1958 
Oct. 23, 1958 
Aug. 15, 1963 
Mar. 2, 1945 
Dec. 22, 1944 
as amended 
Oct. 22, 1976 
Dec. 29, 1981 
July 30, 1983 
Mar. 2, 1945 
Dec. 31, 1970 
Mar. 2, 1945 
Mar. 2, 1945 
May 25, 1978 
Oct. 22, 1976 
Mar. 2, 1945 
Dec. 22, 1944 
as amended 
9. 
10. 
11 
LUCKY PEAK LAKE, ID 
Dam for flood control, irrigation, and 
recreation. 
Second outlet for streamflow maintenance. 
Construction, operation, and maintenance of 
recreation facilities. 
MILL CREEK LAKE, WALLA WALLA, WA 
Off-stream storage project upstream from Walla 
Walla. 
Channel improvement through Walla Walla; 
concrete lined channel. 
OWYHEE RIVER, OR 
Gravel brush and small tree removal from 
12 miles of Owyhee River. 
(BRUCES EDDY) DWORSHAK DAM AND 
RESERVOIR, ID 
Preparation of detailed plans. 
Bruces Eddy dam and reservoir for flood control, 
navigation, power, recreation, and area redevelopment. 
Redesignation of project as Dworshak Dam and 
Reservoir. 
ICE HARBOR LOCK AND DAM - 
LAKE SACAJAWEA, WA 
Unit 1 of 4, Lower Snake River project, Lock and 
dam for navigation, power, recreation, and 
irrigation. 
Construction, operation, and maintenance of 
recreation facilities. 
LEWISTON-CLARKSTON BRIDGE, ID AND 
WA 
Four lane highway bridge and approaches. 
Increase of authorized amount to $23,200,000. 
Approach roadway from bridge to Sixteenth Avenue 
in Clarkston, WA. Increase of authorized amount to 
$24,000,000. 
LITTLE GOOSE LOCK AND DAM - 
LAKE BRYAN, WA 
Unit 3 of 4, Lower Snake River project. Lock and 
dam for navigation, power, recreation, and 
irrigation. 
Designation of reservoir as Lake Bryan. 
LOWER GRANITE LOCK AND DAM, WA 
Unit 4 of 4, Lower Snake River project. Lock 
and dam for navigation, power, recreation, 
irrigation. 
LOWER MONUMENTAL LOCK AND DAM - 
LAKE HERBERT G. WEST, WA 
Unit 2 of 4, Lower Snake River project. Lock 
and dam for navigation, power, recreation, 
and irrigation. 
Designation of reservoir as Lake Herbert G. West. 
LOWER SNAKE RIVER FISH & WILDLIFE 
COMPENSATION PLAN, WA, OR AND ID 
Fish hatcheries and replacement of wildlife habitat. 
McNARY LOCK AND DAM-LAKE 
WALLULA, OR AND WA 
Lock and dam for navigation, power, recreation, 
and irrigation. 
Construction, operation, and maintenance of recreation 
facilities. 
39-12 
See 
Section 
In Text 
P.L. 79-526, Chief of 
Engineers Report 
dated May 13, 1946 
P.L. 94-587 
Sec. 4, Flood Control 
Act of 1944 
H. Doc. 578 75th 
Cong., 3d Sess. 
H. Doc. 719, 76th 
Cong., 1st Sess. 
Sec. 208, P.L. 83-780 
Authorized by Chief 
of Engineers 
Feb. 11, 1985. 
S. Doc 51, 84th Cong., 
1st Sess. 
H. Doc. 403, 87th 
Cong., 2d Sess. 
P.L. 88-96 
H. Doc. 704, 75th Cong., 
3d Sess. 
Sec. 4, Flood Control 
Act of 1944 
P.L. 94-587 
P.L. 97-140 
P.L. 98-63 
H. Doc. 704, 75th 
Cong., 3d Sess. 
P.O. 91-638 
H. Doc. 704, 75th 
Cong., 3d Sess. 
H. Doc. 704, 75th 
Cong., 3d Sess. 
P.L. 95-285 
P.L. 94-587 
H. Doc. 704, 75th Cong., 
3d Sess. 
Sec. 4, Flood Control 
Act of 1944 
Documents 
13. 
14. 
15. 
16. 
17. 
18. 
19. 
20. 
- 
_ I

TABLE 39-B 
(Continued) 
See 
Section A 
In Text 
21. 
WALLA WALLA, WASHINGTON DISTRICT 
AUTHORIZING LEGISLATION 
Date 
authorizing 
Act 
June 13, 1902 
June 25, 1910 
Aug. 30, 1935 
Mar. 2, 1945 
Table E 18 Aug 41 
22 Dec 44 
11 Jul 56 
23 Oct 62 
27 Oct 65 
7 Nov 66 
Project and Work Authorized 
SNAKE RIVER MOUTH TO JOHNSON BAR, 
OR, WA AND ID 
Open-river navigation. 
Riparia to Pittsburg Landing. 
Mouth to Riparia. 
Pittsburg Landing to Johnson Bar. 
Supersedes previous legislation mouth to Lewiston, 
ID only. See Ice Harbor, Lower Monumental, Little 
Goose, and Lower Granite Locks and Dams. 
OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
Dayton, Touchet River, WA. Flood protection. 
Milton-Freewater, Walla Walla River, OR. 
Flood protection. 
Heise Roberts Area, Snake River, ID. Channel 
improvement. 
Malheur Improvement District, Snake River, OR. 
Flood protection. 
Pullman, Palouse River, WA. Flood 
protection. Deauthorized in 1986. 
Esquatzel Coulee, Connell, WA. Levees and 
protective work. 
Lower Dry Creek, Lowden, Wa. Channel 
Improvement. 
Mission and Lapwai Creeks, ID. Construction 
of levee. 
Bear Creek, Kendrick, ID. Channel improvement. 
Lapwai Creek, Culdesac, ID. Construct left bank 
levee. 
Lyman Creek near Rexburg, ID. Channelization. 
'Icannon River, Camp Wooten, WA. Levee and 
channel work. 
Blackfoot Reservoir, Blackfoot River, ID. 
Modification to increase spillway capacity. 
Deauthorized in 1986. 
Ririe Lake, Willow Creek, ID. Storage for flood 
control, irrigation and recreation facilities. 
Grande Ronde Lake, OR. Flood control, irrigation, 
water supply, anadromous fish, downstream and 
resident trout fishery, recreation and downstream 
power. Deauthorized in 1986. 
Cottonwood Creek Dam, ID. Protection to highly 
developed urban and suburban areas against flash 
floods. Deauthorized in 1986. 
Stuart Gulch Dam, ID. Protection to highly 
developed urban and suburban areas against flash 
floods. Deauthorized in 1979. 
Documents 
H. Doc. 127, 56th Cong., 
2d Sess. 
H. Doc 411, 55th Cong., 
2d Sess. 
Rivers and Harbors 
Committee Doc. 25, 
72d Cong., 1st Sess. 
H. Doc. 704, 75th Cong., 
2d Sess. 
H. Doc. 662, 76th Cong., 
3d Sess. 
H. Doc 719, 76th Cong. 
3d Sess. 
78th Cong., 2d Sess. 
P.L. 84-685 
P.L. 87-874 
P.L. 89-298 
P.L. 89-789 
39-13 
I _

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Project Status 
Columbia River and Tributaries 
above Celilo Falls to 
Kennewick, WA1 
Completed 
For Last 
Full Report 
See Annual 
Report For 
1968 
Cost to Sep. 30, 1987 
Operation 
and 
Construction Maintenance 
1,851,195 
'Obviated by The Dalles, John Day, and McNary projects 
TABLE 39-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
Project Status 
Asotin Creek, Asotin, ID' 
Bear Creek, Kendrick, ID' 
Big Wood River, ID5 
Boise, River, ID5 
Catherine Creek Lake, OR 
Connell, WA' 
Cottonwood Creek Community Church, 
Culdesac, ID2 
Dayton, Touchet River, WA 
Dry Creek, WA' 
Esquatzel Coulee, Connell, WA' 
Esquatzel Coulee, Mesa, WA' 
Gooding Area, ID' 
Graves Creek, ID' 
Heise-Roberts Area, Snake River, ID 
Jackson Hole, Snake River, WY 
Lapwai Creek, Culdesac, ID' 
Lava Hot Springs, Portneuf River, ID' 
Lower Dry Creek, Lowden, WA' 
Lyman Creek, ID' 
Malheur Improvement District, Snake River, OR 
Milton-Freewater, Walla Walla River, OR3 
Mission and Lapwai Creeks, ID' 
Orofino Creek & Clearwater River, Orofino, ID2 
Rapid Creek, ID5 
Pataha Creek, Pomeroy, WA2 
Payette River, Emmett Sewage Lagoon, ID2 
Riverside Area, Pasco, WA' 
Ririe Lake, ID 
Sewage Lagoons, Vale, OR2 
Shobe Canyon, Heppner, OR' 
Snake River, Blackfoot, ID' 
Snake River, Heise Bridge Location, ID2 
Snake River, Stevens, Blackfoot, ID' 
South Fork, Boise River, ID5 
South Fork Clearwater River, Kooskia-Stites, ID' 
Tomanovich-Salmon City, ID' 
Touchet River, Waitsburg, WA' 
Tucannon River, Wooten, WA' 
Umatilla River, OR' 
Wallowa River, Weaver Bridge, OR2 
Weiser River, ID5 
Willow Creek, ID' 
Willow Creek Lake, OR 
Yakima River, West Richland, WA 1, 4 
Completed 
Completed 
Completed 
Completed 
Deferred 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Inactive 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
For Last 
Full Report 
See Annual 
Report For 
1951 
1970 
1985 
1985 
1978 
1967 
1984 
1966 
1961 
1967 
1969 
1954 
1953 
1955 
1978 
1972 
1973 
1972 
1971 
1957 
1968 
1965 
1949 
1985 
1977 
1967 
1972 
1983 
1985 
1970 
1980 
1952 
1968 
1985 
1973 
1955 
1973 
1971 
1961 
1960 
1985 
1963 
1985 
1964 
Cost to Sep. 30, 1987 
Operation 
and 
Construction Maintenance 
12,019 
133,518 
170,000 
236,500 
1,552,000 
60,000 
23,400 
380,617 
384,426 
232,792 
2,665 
59,167 
75,469 
1,575,838 
2,388,270 
176,833 
113,296 
17,592 
230,315 
55,894 
1,786,753 
54,538 
23,050 
19,500 
110,815 
39,172 
28,839 
39,677,448 
75,000 
5,000 
131,700 
8,501 
32,425 
44,400 
61,055 
128,635 
72,140 
73,932 
161,540 
16,118 
106,900 
976 
37,168,114 
238,890 
'Authorized by Chief of Engineers pursuant to Section 
205, PL 80-858. 
2Authorized by Chief of Engineers pursuant to Section 
14, PL 79-526. 
3Exclusive of $6,300 contributed funds. 
4Includes $9,000 contributed funds. 
5Authorized by Chief of Engineers pursuant to Section 
208, PL 83-780. 
39-14 
TABLE 39-C OTHER AUTHORIZED NAVIGATION PROJECTS 
- -- 
- I- I------- 
- I I--------^-I--~---- 
-- 
'U 
'"" 
YI 
I" 
"- 
"-" 
~
'U 
'U 
'Y" 
~
"U 
-" 
I

TABLE 39-G 
WALLA WALLA, WASHINGTON DISTRICT 
DEAUTHORIZED PROJECTS 
Project 
Asotin Dam, Snake River, ID & WA 
Blackfoot Reservoir, ID 
Boise Valley, ID 
Ada County Unit 
Canyon County Unit 
Camas Creek ID 
Cottonwood dreek Dam, Boise, ID 
Grande Ronde Lake, OR 
Grande Ronde Valley, OR 
Heise-Roberts Extension, ID 
Henrys Fork Unit 
Little Wood River, ID 
Lower Walla Walla River, WA 
Malheur River, OR 
Willow Creek Unit 
Mill Creek, WA 
Palouse River, WA 
Payette Valley, ID 
Portneuf River, Inkom-Marsh Creek, ID 
Pullman, Palouse River, WA 
S. Fort Clearwater River, ID 
Stuart Gulch Dam, Boise, ID 
Teton River, ID 
Touchet River, WA 
Whitebird Creek, Columbia River Basin, ID 
For Last 
Full Report 
See Annual Date 
Report For Deauthorized 
1964 1975 
1980 1986 
1963 
1963 
1960 
1972 
1966 
1958 
1968 
1960 
1953 
1961 
1958 
1958 
1960 
1964 
1973 
1974 
1955 
1957 
1957 
1986 
1967 
1965 
1986 
1986 
1986 
1986 
1965 
1986 
1969 
1977 
1986 
1978 
1969 
1986 
1986 
1979 
1986 
1977 
1986 
Federal Contributed 
Funds Funds 
Expended Expended 
267,626 - 
46,084 - 
10,600 - 
9,080 - 
183,100 - 
102,458 - 
27,800 - 
21,334 - 
4,000 - 
13,000 - 
3,537 - 
2,000 - 
23,178 - 
99,540 - 
3,899 - 
234,100 - 
10,387 - 
11,198 - 
1,896 - 
TABLE 39-H COLUMBIA RIVER BASIN, LOCAL 
FLOOD PROTECTION PROJECTS 
(See Section 2 of Text) 
Project 
Blackfoot Area, Snake River, ID 
Blackfoot River, ID 
Heise-Roberts Extension, ID 
Snake River Unit 
Kendrick, Potlatch River, ID 
Malheur River, OR 
Vale Unit 
Mud Lake, ID 
Portneuf River and Marsh Creek, ID 
Pocatello Unit 
Shelley Area, Snake River, ID 
Weiser River, ID 
Weiser River, ID 
Cambridge-Midvale 
Total 
Estimated 
Federal 
Cost Cost to Sep. 30, 1987 
- 42,796 
391,143 
'Exclusive of $36,800 contributed funds. 
39-15 
Status 
Completed 
Completed 
Completed 
Completed 
Completed 
Inactive 
Completed 
Completed 
Deferred 
Deferred 
1,187,000 
1,565,000 
3,375,158 
59,942 
325,581 
5,996 
6,456,0321 
32,335 
37,757 
75,000 
10,801,740 
~----------------------- 
~'~---~----~1"~11------~I- ----~-~1-----" ~---- I~ -- -- I- I-U' 
I - - -

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 39-I INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
(See Section 7 of Text) 
Blackfoot River, Idaho 
Boise River, Idaho 
Clearwater River, Idaho 
Columbia River, Washington 
Little Wood River, Idaho 
Malheur River, Idaho 
Palouse River, Idaho 
Payette River, Idaho 
Portneuf River, Idaho 
Potlatch River, Idaho 
Salmon River, Idaho 
Snake River, Idaho 
Snake River, Wyoming 
Touchet River, Washington 
Tucannon River, Washington 
Yakima River, Washington 
August 1987 
April 1987 
March 1987 
March 1987 
August 1987 
April 1987 
February 1987 
April 1987 
May 1987 
March 1987 
September 1987 
August 1987 
July 1987 
March 1987 
March 1987 
March 1987 
PRINCIPAL DATA CONCERNING 
NAVIGATION LOCK, SPILLWAY DAM, 
POWERPLANT, AND IMPOUNDMENT 
Project 
Dworshak Dam and 
Reservoir, ID 
(See Section 13 of Text) 
Type of Constructi 
Completed 
Maximum Capacil 
SPII 
on 
ty 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POv 
Length 
Generating Units: 
Number Installed 
Space for Additional 
Rating, Each 
LLWAY DAM 
WERPLANT 
Total Capacity Installed 
Total Potential Capacity 
Maximum Structural Height 
First Power-On-Line
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Flood Control Storage 
Lake Length 
Lake Water Surface Area at Elevation 1600 
Length of Shoreline 
Concrete Gravity 
September 1974 
150,500 Cubic Feet 
Per Second 
1613 Feet 
Tainter 
50 Ft. by 55 Ft. 
2
428 Feet 
3
3
2 @ 90,000 kw; 
4 @ 220,000 kw 
400,000 kw 
1,060,000 kw 
150 Feet 
March 1973 
1600-1445 Feet 
1605 Feet 
2,000,000 Ac.-Ft. 
53 Miles 
17,090 Acres 
175 Miles 
39-16 
TABLE 39-J

TABLE 39-J 
(Continued) 
WALLA WALLA, WASHINGTON DISTRICT 
PRINCIPAL DATA CONCERNING 
NAVIGATION LOCK, SPILLWAY DAM, 
POWERPLANT, AND IMPOUNDMENT 
Project 
Ice Harbor Lock and. Dam, 
WA (See Section 14 of 
Text) 
Little Goose Lock and Dam, 
WA (See Section 16 of 
Text) 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Generating Units: 
Number Installed 
Rating, Each 
Total Installed Capacity 
Maximum Structural Height 
First Power-On-Line 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 440 
Navigation Channel, Depth by Width 
Length of Shoreline 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
86 Feet 
675 Feet 
97 Feet 
100 Feet 
103 Feet 
15 Feet 
May 1962 
Concrete Gravity 
January 1962 
850,000 cfs 
391 Feet 
Radial 
50 Ft. by 51 Ft. 
10 
671 Feet 
6
3 @ 90,000 kw; 
3 @ 111,000 kw 
603,000 kw 
226 Feet 
December 1961 
440-437 Feet 
446 Feet 
31.9 Miles 
9,200 Acres 
14 Ft. by 250 Ft. 
80 Miles 
86 Feet 
675 Feet 
93 Feet 
98 Feet 
101 Feet 
15 Feet 
May 1970 
Concrete Gravity 
January 1970 
850,000 cfs 
581 Feet 
Radial 
50 Ft. by 60 Ft. 
8 
39-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 39-J 
(Continued) 
PRINCIPAL DATA CONCERNING 
NAVIGATION LOCK, SPILLWAY DAM, 
POWERPLANT, AND IMPOUNDMENT 
Project 
Little Goose Lock and 
Dam (Continued) 
Lower Granite Lock 
and Dam, WA (See 
Section 17 of Text) 
POWERPLANT 
Length 
Width 
Generating Units: 
Number Installed 
Rating, Each 
Total Capacity Installed 
Maximum Structural Height 
First Power-On-Line
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface area at Elevation 738 
Navigation Channel, Depth by Width 
Length of Shoreline 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type: 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Width 
Generating Units: 
Number Installed 
Rating, Each 
Total Capacity Installed 
Maximum Structural Height 
First Power-On-Line
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface area at Elevation 738 
Navigation Channel, Depth by Width 
Length of Shoreline 
656 Feet 
243 Feet 
6
135,000 kw 
810,000 kw 
244 Feet 
March 1970 
638-633 Feet 
646.5 Feet 
37.2 Miles 
10,025 Acres 
14 Ft. by 250 Ft. 
92 Miles 
86 Feet 
675 Feet 
95 Feet 
100 Feet 
105 Feet 
15 
May 1975 
Concrete Gravity 
February 1975 
850,000 cfs 
581 Feet 
Radial 
50 Ft. by 60.5 Ft. 
8
656 Feet 
243 Feet 
6
135,000 kw 
810,000 kw 
246 Feet 
April 1975 
738-733 Feet 
746.5 Feet 
38 Miles 
8,900 Acres 
14 Ft. by 250 Ft. 
91 Miles 
39-18

TABLE 39-J 
(Continued) 
WALLA WALLA, WASHINGTON DISTRICT 
PRINCIPAL DATA CONCERNING 
NAVIGATION LOCK, SPILLWAY DAM, 
POWERPLANT, AND IMPOUNDMENT 
Project 
Lower Monumental 
Lock and Dam, WA 
(See Section 18 of Text) 
McNary Lock and 
Dam, OR and WA 
(See Section 20 of Text) 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Width 
Generating Units: 
Number Installed 
Rating, Each 
Total Installed Capacity 
Maximum Structural Height 
First Power-On-Line
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 540 
Navigation Channel, Depth by Width 
Length of Shoreline 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
86 Feet 
675 Feet 
97 Feet 
98 Feet 
103 Feet 
15 Feet 
April 1969 
Concrete Gravity 
March 1969 
850,000 cfs 
483 Feet 
Radial 
50 Ft. by 61 Ft. 
8
656 Feet 
243 Feet 
6
135,000 kw 
810,000 kw 
242 Feet 
May 1969 
540-537 Feet 
548 Feet 
28.7 Miles 
6,590 Acres 
14 Ft. by 250 Ft. 
78 Miles 
86 Feet 
675 Feet 
67 Feet 
75 Feet 
83 Feet 
15 Feet 
November 1953 
Concrete Gravity 
October 1953 
2,200,000 cfs 
291 Feet 
Vertical Lift 
50 Feet by 51 Feet 
22 
39-19

TABLE 39-J 
(Continued) 
WALLA WALLA, WASHINGTON DISTRICT 
PRINCIPAL DATA CONCERNING 
NAVIGATION LOCK, SPILLWAY DAM, 
POWERPLANT, AND IMPOUNDMENT 
Project 
McNary Lock and 
Dam, OR and WA 
(Continued) 
POWERPLANT 
Length 
Generating Units: 
Number Installed 
Rating, Each 
Total Installed Capacity 
Maximum Structural Height 
First Power-On-Line 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 340 
Navigation Channel, Depth by Width 
Length of Shoreline 
1,348 Feet 
14 
70,000 kw 
980,000 kw 
193 Feet 
November 1953 
340-335 Feet 
356.5 Feet 
64 Miles 
38,800 Acres 
14 Ft. by 250 Ft. 
242 Miles 
39-20

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 39-K SNAKE RIVER DOWNSTREAM FROM 
JOHNSON BAR LANDING 
OR, WA, AND ID 
(See Section 21 of Text) 
Estimated 
Cost (Corps 
of Engineers 
Funds Only) 
New Work 
to Sep. 30, 1987 
Approp. Cost 
Maintenance 
to Sep. 30, 1987 
Approp. Cost 
Percent 
Com- Constr. 
pleted Started 
Ice Harbor Lock & Dam 
Initial Project 
Code 710 Recreation 
Facilities 
Power Units 4-6 
Totals 
Little Goose Lock & Dam 
Initial Project 
Power Units 4-6 
Totals 
Lower Granite Lock & Dam 
Initial Project 
Code 710 Recreation 
Facilities 
Power Units 4-6 
Totals 
Lower Monumental Lock & Dam 
Initial Project 
Power Units 4-6 
Totals 
Open River Lewiston to 
Johnson Bar Landing- 
Open River Pasco to 
Lewiston 
Totals Existing Project 
Previous Projects 
Pasco to Lewiston 
129,578,480 
914,256 
36,748,021 
167,240,757 
160,413,215 
60,941,807 
221,355,022 
321,503,981 
63,800 
46,212,534 
367,780,315 
184,712,361 
51,661,371 
236,373,732 
34,613 
992,784,439 
400,150 
129,578,480 
914,256 
36,748,021 
167,240,757 
160,413,215 
60,941,807 
221,355,022 
321,503,981 
63,800 
46,212,534 
367,780,315 
184,712,361 
51,661,371 
236,373,732 
34,613 1 
992,784,439 
400,150 
129,578,490 
914,256 
36,748,021 
167,240,757 
160,413,215 
60,941,807 
221,355,022 
321,503,979 
63,800 
46,212,534 
367,780,315 
184,712,361 
51,661,371 
236,373,732 
34,613 
992,784,437 
400,150 
55,852,574 55,496,202 
55,852,574 
44,729,505 
44,729,505 
53,578,202 
53,578,202 
40,341,432 
40,341,432 
365,655 
4,350 
194,871,718 
186,570 
55,496,202 
44,476,795 
44,476,795 
53,053,183 
53,053,183 
40,092,368 
40,092,368 
363,954 2 
4,350 
193,486,852 
186,570 
Totals Authorized 
Project 993,184,589 993,184,589 993,184,587 195,058,288 193,673,422 
1New Work appropriations used for maintenance prior to 1953. 
2Includes $2,945 FY 1987 project condition survey cost. 
39-21 
Project 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
FY 57 
FY 57 
FY 71 
FY 63 
FY 74 
FY 65 
FY 84 
FY 74 
FY 61 
FY 75 
100 
--

ALASKA DISTRICT * 
This District consists of the State of Alaska
IMPROVEMENTS 
Navigation 
1. Anchorage Harbor, AK .................. 
2. Dillingham Harbor, AK ................. 
3. Homer Harbor, AK .................... 
4. Kake Harbor, AK .................... 
5. Metlakatla Harbor, AK .................. 
6. Ninilchik Harbor, AK ................... 
7. Nome Harbor, AK ....................... 
8. Project Condition Surveys ............... 
9. Stikine River, AK ...................... 
10. Wrangell Harbor, AK .................... 
Flood Control 
11. Chena River Lakes, AK ................. 
12. Dillingham Emergency Bank 
Stabilization, AK ........................ 
13. Galena Emergency Bank Stabilization, 
A K ..................................... 
14. Flood Control Work Under 
Special Authorization ................. 
15. Inspection of Completed Flood 
Control Projects ......................... 
Page 
40-1 
40-1 
40-2 
40-2 
40-2 
40-3 
40-3 
40-3 
40-3 
40-4 
Multiple-Purpose Projects, Including Power 
16. Snettisham, AK ......................... 40-5 
General Investigations 
17. Surveys ................................. 
18. Collection and Study of Basic Data ...... 
19. Preconstruction, Engineering and Design .. 
Tables 
Table 40-A 
Table 40-B 
Table 40-C 
40-4 Table 40-D 
Table 40-E 
40-4 
Table 40-F 
40-4 Table 40-G 
Table 40-H 
40-4 
Table 40-I 
40-5 Table 40-J 
Table 40-K 
40-5 
40-5 
40-5 
Cost & Financial Statement ...... 40-6 
Authorizing Legislation .......... 40-8 
Other Authorized Navigation 
Projects ......................... 40-10 
Not Applicable 
Other Authorized Flood 
Control Projects ................. 40-11 
Not Applicable 
Deauthorized Projects ........... 40-11 
Navigation Work Under Special 
Authorization ............ 40-12 
Project Condition Surveys ....... 40-12 
Not Applicable 
Not Applicable 
Navigation 
1. ANCHORAGE HARBOR, AK 
Location. Anchorage is in southcentral Alaska on 
the southeast shore of Knik Arm, north of Turnagain 
Arm near its junction with Cook Inlet. (See NOAA 
Charts 16660 and 16664.) 
Existing project. Provides for dredging along a 
3,000-foot baseline adjacent to the Port of Anchorage 
dock to a depth of 35 feet below mean lower low water. 
Tidal range between mean lower low water and mean 
higher high water is 29.0 feet and the extreme range is 
42.0 feet. 
Local cooperation. Fully complied with. 
Terminal facilities. The Port of Anchorage facility 
consists of a POL terminal at the southern end and 
three general cargo terminals northward. The northernmost 
terminal, completed during 1976 and 1977 
was outside the Federal project limits. Extension of 
limits from 2,070 feet northward to 3,000 feet was 
authorized by Public Law 94-587 and funded in FY 
1978. 
Operations during Fiscal year. Maintenance: 
Dredging has been accomplished across the entire project 
during FY 1987. Controlling depth at the harbor 
was -34.2 feet mean lower low water, with a majority of 
the harbor at project depth of -36. A contract was 
awarded in October 1986 to clean up sediments which 
the dredge Essayons could not reach in FY 1986. 
Approximately 19,600 cubic yards were removed in 
November 1986 under that contract. Regular maintenance 
dredging was accomplished by contract during 
June through September 1987. A total of 307,000 cubic 
yards of silt was removed. 
2. DILLINGHAM HARBOR, AK 
Location. At head of Nushagak Bay, an arm of 
Bristol Bay, on right bank of Nushagak River just 
below its confluence Wood River; about 470 miles 
northeasterly of Dutch Harbor and 300 miles southwest 
of Anchorage. (See NOAA/NOS Chart #16660.) 
Existing Project: A small-boat basin 230,000 
square feet in area with a depth of 2 feet above mean 
lower low water along Scandinavian Creek; with 
entrance channel 1,100 feet long and 40 feet wide in 
Scandinavian Creek; and a sheet pile sill across the 
basin outlet with a top elevation of 7 feet above mean 
40-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
lower low water. During design stage the project was 
revised to include a rock sill with adjacent scourprotection 
blankets and the embankment was relocated 
to include a berm between the basin and the 
embankment. Tidal range between mean lower low 
water and mean higher high water is 19.8 feet. 
Extreme range is 30.0 feet. 
Local cooperation. Fully complied with. 
Terminal facilities. Four docks at the city of Dillingham; 
three privately owned, one owned by the city 
of Dillingham, and four publicly owned small-boat 
floats in the project basin. Two docks are used by the 
city to unload barges which come into Dillingham. 
New floats for the harbor were installed in June 1982 
and removed before fall freezeup. They are replaced 
each spring. Cargo and passengers from ocean vessels 
are unloaded at the docks or in the small-boat basin. 
Facilities are inadequate for number of boats using 
small boat harbor. 
Operations during fiscal year. Maintenance: 
Government plant and hired labor performed dredging 
from the end of May to the middle of June 1987. A 
total of 89,200 cubic yards of material was removed. 
3. HOMER HARBOR, AK 
Location. In Kachemak Bay, on Kenai Peninsula, 
152 miles by water southwest of Anchorage. Harbor site 
is land based near the extremity of Homer Spit which 
varies to one-quarter mile in width and extends 4.5 miles 
southeasterly from the mainland. (See NOAA/NOS 
Chart #16645.) 
Existing project. Provides for sheltered small-boat 
harbor, relocated and based within Homer spit about 50 
acres in area. Project depth varies from 10 feet mean 
lower low water in the most western segment of the 
harbor to 20 feet below mean lower low water in the 
entrance channel and the most eastern segment of the 
harbor; a north entrance channel; protected by a main 
rock breakwater 1,018 feet long and secondary rock 
breakwater 238 feet long. Tidal range between mean 
lower low and mean higher high water is 18.1 feet, with 
an extreme range of 30.4 feet. (For details relating to 
previous projects, see page 1593 of Annuual Report for 
1964.) 
Local cooperation. Fully complied with. 
Terminal facilities. One publicly owned and operated 
wharf capable of handling oceangoing vessels 
serves for passengers and general cargo. Small-boat 
facilities in basin area include publicly owned mooring 
floats, apublicly owned wharf, and an industrial wharf. 
Construction has tripled size of the harbor. The city of 
Homer has tripled the size of its fish dock Iocated at the 
soiuthern end ofthe harbor. 
Operations during fiscal year. Maintenance: 
Dredging operations were initiated in October 1986 but 
?re suspended because of adverse weather conditions. 
idging was resumed in July 1987. Government plant 
Shired labor removed a total of 8,500 cubic yards 
g July and August 1987. 
4. KAKE HARBOR, AK 
Location. Kake Harbor is located in the city of Kake, 
on the northwest corner of Kupreanof Island in southeastern 
Alaska, 39 air miles west of Petersburg, AK, 
and 850 water miles northwesterly of Seattle, WA. (See 
Coast and Geodetic Chart 8201.) 
Existing prqject. The authorized project consists of 
a 1,580-foot-long west breakwater and a 1,750-foot-long 
south breakwater. Tidal range between mean lower low 
water and mean higher high water is 14.0 feet with an 
extreme range of 22 feet. Estimated project cost is 
$12,537,000 (October 1985), including $12,500,000 Corps 
of Engineers funds $21,000 Coast Guard funds, and 
$16,000 non-Federal cost. 
Local cooperation. Fully complied with. 
Terminal facilities. At Kake, a publicly owned 
wharf with seaplane float equipped airplanes and 
shallow-draft vessels is located within area of proposed 
basin. At cannery 1 mile from city, there are two privately 
owned deep-draft piers; one for cargo, open to all 
local boat owners, the second for fuel, including a float 
for fueling small boats. At Portage Cove, 2 miles from the 
city, the existing float was expanded into a small boat 
facility by the state in 1982. It consists of 2 mooring 
floats, a launch ramp, a grid and is protected by a floating 
breakwater. Facilities are not considered adequate 
for present commerce due to the following deficiencies in 
small-boat facilities: shallow water at Portage Cove and 
its approaches; ice formation on the cove during the 
winter months causing major boat damage and limiting 
the use of the mooring float; and transportation problems 
between city and present facility at Portage Cove. 
Operations during fiscal year. New work: A temporary 
automatic meteorburst wind monitoring station 
was maintained to gather wind velocity and directional 
data more closely associated with the location of the 
project for comparison with data used in preparing the 
plans and specifications. 
5. METLAKATLA HARBOR, AK 
Location. Metlakatla is located in the southern portion 
of Port Chester, a small bay on the northwest coast 
of Annette Island in southeastern Alaska, 18 miles south 
of Ketchikan. (See Coast and Geodetic Charts 8074, 
8075, and 8102.) 
Existing project. Consists of two small-boat basins. 
Existing basin is 2.18 acres in extent with a depth of 10 
feet below mean lower low water, protected by a rubblemound 
breakwater 900 feet long. New basin consists of 
two rubbiemound breakwaters, 1,255 and 1,150 feet long, 
and an entrance channel and maneuvering area, 1,100 
feet long, 100 feet wide, dredged to a depth of 15 feet 
below mean lower low water and a basin area of 6.25 
acres dredged to a depth of 15 feet below mean lower low 
water. Tidal range between mean lower low water and 
mean higher high water is 14.7 feet, with an extreme 
range of 24 feet. 
Local cooperation. Fully complied with. 
Terminal facilities. Publicly owned facilities are one 
40-2

ALASKA DISTRICT 
general-cargo dock, one barge ramp, and a small-boat 
float system in existing basin. Privately owned facilities 
are one oil pier and one industrial wharf. Facilities are 
not adequate for mooring the commercial fishing vessels 
operating from Metlakatla. Existing protected harbor 
area is fully utilized. 
Operations during fiscal year; New work: Project 
is physically complete; however, various contractor 
claims are still pending. 
6. NINILCHIK HARBOR, AK 
Location. At mouth of Ninilchik River in Cook Inlet, 
at the community of Ninilchik, AK about 40 miles 
upcoast from Homer and 112 miles southwest of 
Anchorage. (See NOAA/NOS Chart #16640.) 
Existing project. A small-boat basin 320 feet long by 
150 feet wide dredged to elevation of 2 feet above mean 
lower low water, with an approach channel 400 feet long 
and 50 feet wide dredged to an elevation of 9 feet above 
mean lower low water; protected by a pile jetty 410 feet 
long. Project was modified in design stage to delete pile 
jetty and revise harbor dimensions to 400 feet long by 
125 feet wide, and was completed in November 1961. 
Modification, including river channel diversion, 
two armor rock jetties, and beach protection, was 
accomplished 1967 and 1969. Range between mean 
lower low water and mean higher high water is 19.1 feet, 
with an extreme range of 29.3 feet. 
Local cooperation. Fully complied with. 
Terminal facilities. Facilities, limited to shallowdraft 
vessels and accessible from Cook Inlet only at 
half-tide or higher, are a cannery dock along Ninilchik 
River available for offloading fish, and small-boat floats 
in project basin, provided by State of Alaska. Other 
supplies are landed on beach or brought by road from 
deep-draft ports in the vicinity. Facilities are extremely 
inadequate for the number of boats presently using harbor. 
Expansion of facilities would require construction of 
additional protected harbor area. 
Operations during fiscal year. Maintenance: 
Dredging of the harbor and entrance channel was 
accomplished with 8,600 cubic yards removed in 1987. A 
survey of the basin during May 1987 indicated project 
depth was available throughout the Federal limits. 
7. NOME HARBOR, AK 
Location. At mouth of Snake River at the city of 
Nome, AK, on northerly shore of Norton Sound, an arm 
of Bering Sea. It is a shallow open roadstead, 581 nautical 
miles north of Dutch Harbor and 545 air miles 
northwest of Anchorage. (See NOAA/NOS Chart 
#16206.) 
Existing project. Provides for two jetties, the easterly 
951 and the westerly not exceeding 676 feet long, at 
mouth of Snake River; a channel 8 feet at mean lower 
low water, 75 feet wide, from Norton Sound through 
Snake River to mouths of Bourbon and Dry Creeks, in 
city of Nome, ending in a turning basin of the same 
depth, 250 feet wide and 600 feet long; revetting banks of 
rivers; and protecting all existing water-front improvements 
on easterly beach by means of rock-mount seawall 
3,350 feet long extending easterly from east jetty. 
Project has been completed except extension of jetties 
beyond present 400 and 240 feet, which is classified 
inactive. Range between mean lower low water and 
mean higher high water is 1.6 feet and extreme tidal 
range is 7.5 feet, but water levels are influenced more by 
wind than tide. Levels of 5 feet below mean lower low 
water have been observed during offshore winds, and a 
level of 14 feet above mean lower low water has been 
observed during a southerly storm. 
Local cooperation. Fully complied with. 
Terminal facilities. Cargoes and passengers from 
ocean vessels are lightered to and from shore a distance 
of about 2 miles. Traffic enters dredged channel and is 
handled over revetment, where lighterage company has 
transfer facilities which are open to the public. Facilities 
considered inadequate for existing commerce. In July 
1984, the city of Nome received Department of Army 
authorization (permit) to construct a 3,600-foot gravelfilled 
causeway. Construction of the causeway began in 
July 1985. Due to lack of complete funding the length of 
the causeway was shortened to 2,700 feet. Construction 
was completed in May 1987. Use of this causeway for 
offloading petroleum products was delayed until the 
September 1987 arrival of a required berthing barge. 
Operations during fiscal year. Maintenance: 
Dredging by contract was accomplished throughout the 
ice-free season. 2,900 cubic yards were removed in FY 
1987. Seriously damaged conditions of the entrance 
channel sheetpile wall necessitated immediate interim 
repairs. A Letter Report for interim repairs was prepared 
and approved. Construction was initiated in September 
1986 and was completed in December 1986. 
8. PROJECT CONDITION SURVEYS 
Preliminary and detailed surveys to determine navigation 
conditions at boat basins, small navigation projects, 
channels and tributaries of major rivers not within 
major project boundaries. Total costs for fiscal year 
were $372,113. (See Table 40-I). 
9. STIKINE RIVER, AK 
Location. Rises in northwestern Canada and flows 
southwesterly through Canada for about 200 miles, then 
about 30 miles westerly across Panhandle of Alaska to 
Sumner Strait. Mouth of river is on coast of mainland 
about 3 miles north of Wrangell. (See NOAA/NOS 
Chart #17360.) 
Existing project. Snagging Stikine River from its 
mouth for about 3 miles to Canadian border. The Canadian 
Government maintains that portion of the river 
between Alaskan border and Telegraph Creek, British 
Columbia, a distance of 130 miles. The head of navigation 
is at 'ITelegraph Creek, B.C., about 160 miles above 
the mouth. No data is available concerning stages of 
high and low water in river. At mouth, tidal range 
between mean lower low water and mean higher high 
water is 13.9 feet, and maximum range is about 25 feet. 
Tidal effects have been reported at a distance of 20 miles 
from the mouth. 
Local cooperation. None required. 
Terminal facilities. None along Alaskan portion of 
river. Vessels operating on Stikine River are dependent 
40-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
on terminal facilities at Wrangell Harbor. Facilities 
include a city operated pier for general cargo and passengers; 
two publicly operated small-boat mooring 
floats; two privately operated small-boat fueling floats; a 
State of Alaska Ferry Pier, and three industrial 
wharves. 
Operations during fiscal year. Maintenance: 
Under a Memorandum of Understanding between the 
Corps and the Forest Service signed in 1972, $8,804 was 
expended on a contract administered by the Forest Service 
for removal of snags. Snagging was accomplished 
during May and June 1987. 
10. WRANGELL HARBOR, AK 
Location. Wrangell Harbor is located on the west side 
of the northern end of Wrangell Island, 824 miles from 
Seattle and 160 miles from Juneau. (See U.S. Coast and 
Geodetic Survey Charts Nos. 8164, 8161, and 8201.) 
Existing project. This provides for a rubblemound 
breakwater 300 feet long to protect the southern portion 
of the outer harbor; dredging a mooring basin 600 feet 
long, 400 feet wide, and 10 feet deep below mean lower 
low water within the protected area; an inner basin in 
the tide flat area east of Shakes Island, 325 feet wide and 
550 feet long and a connecting channel 120 feet wide and 
approximately 530 feet long from the outer mooring 
basin all at a depth of 10 feet at mean lower low water; 
and construction of a rock mound breakwater 320 feet 
long on the reef north of Shakes Island. The range 
between mean lower low water and mean higher high 
water is 15.7 feet. The extreme tidal range is 26 feet. 
Heavy swells, dangerous to small fishing boats, are 
caused by the wind, which causes an additional rise of 
about 1 foot. 
Construction of the breakwater north of Shakes 
Island was placed on inactive status as material to be 
used from the inner basin was unsuitable and the 
breakwater considered unnecessary for safe moorage of 
vessels. The cost of this portion was last revised in 1956 
was estimated to be $6,500. (See table 40-B for authorizing 
legislation.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are eight wharves and 
floats in Wrangell Harbor. Two privately owned 
wharves serving general cargo and passenger terminals, 
one of which includes a cold storage facility, are 
open for public use. The remaining wharves serve various 
industrial purposes. One of the floats is publicly 
owned and is open for public use for mooring and servicing 
small craft, and two privately owned floats serve 
oil-handling facilities. 
Operations during fiscal year. Maintenance: A letter 
report was initiated to address repairs required to the 
concrete curb wall which tops the breakwater. This curb 
wall, which has received no maintenance work since 
1938, has become badly spalled and deterioriated. The 
letter report, scheduled for completion in December 1987, 
will evaluate replacement in kind, encapsulation and 
replacement with additional rubblemound alternatives. 
$45,200 was expended during FY 1987. 
Flood Control 
11. CHENA RIVER LAKES, AK 
Location. In the vicinity of Fairbanks, AK, and 
encompassing the Tanana River, Chena River, Little 
Chena River, and their tributaries. (See USGS map 
Fairbanks, C1, D1, D2, and Big Delta D6.) 
Local cooperation. Fully complied with. 
Existing project. Moose Creek Dam has been constructed 
17 miles east of Fairbanks with control works 
on Chena River. The dam itself extends from a bluff one 
mile north of the Chena River and south past the control 
works for approximately six miles to the Tanana River. 
The dam connects with a completed 22-mile levee system 
along the north boundary of the Tanana River to a point 
south and west of Fairbanks. Estimated Federal cost is 
$210,000,000, (excluding Little Chena Dam, presently 
deferred) and estimated non-Federal cost is $12,548,000. 
Operations during fiscal year. New work: Construction 
of the Tanana River Levee Protection Phase II, 
Groins 9 and 10, the Relief Wells, and the Office and 
Warehouse contracts were completed. A construction 
contract for the Visitors' Facilities was awarded in 
August 1987. 
12. DILLINGHAM EMERGENCY BANK 
STABILIZATION, AK 
Location. City of Dillingham is located at the confluence 
of the Wood and Nushagak Rivers in the Bristol 
Bay area of southwestern Alaska. 
Existing project: Relocate water and sewer lines. 
Local cooperation. Will be required prior to 
construction. 
Operation during fiscal year. New Work: Continued 
contacts with local sponsor. 
13. GALENA EMERGENCY BANK 
STABILIZATION, AK 
Location. Galena is located on the north bank of the 
Yukon River approximately 270 miles west of Fairbanks, 
AK and 325 miles north-northwest of Anchorage, AK. 
Existing project. The project will provide approximately 
1200 feet of riverbank protection when contributed 
funds are included. The protection will be in front of 
"New Town" Galena or the Alexander Lake area, thus 
extending the bank stabilization project the State 
started in 1985. 
Local cooperation. A Local Cooperation Agreement 
was developed. 
Operation during fiscal year. New Work: Contract 
awarded July 1987. 
14. FLOOD CONTROL WORK UNDER SPECIAL 
AUTHORIZATION 
Emergency flood control activities - repair, 
flood fighting, and rescue work (Public Law 99, 
84th Congress, and antecedent legislation). 
Federal costs for the fiscal year were $267,221 for 
disaster preparedness and emergency operations. 
40-4

ALASKA DISTRICT 
Flood control activities pursuant to Section 205, 
Public Law 858, 80th Cong., as amended 
(preauthorization). 
Fiscal year cost for preauthorization study was: 
Aniak, $2,102. 
Emergency bank protection activities pursuant 
to Section 14, 526, 79th Cong. (preauthorization) 
15. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Inspections were made of flood control works at 
Lowell Creek, Gold Creek, Skagway River, Salmon 
River, Talkeetna River, and Klutina River during FY 
1987. Repairs at each project were recommended to the 
local authority. Total costs for the fiscal year: $8,949. 
Multiple-Purpose Projects, 
Including Power 
16. SNETTISHAM, AK 
Location. At mouth of Speel River, between Crater 
Lake to the west and Long Lake to the north, 28 nautical 
miles southeast of Juneau. (See Coast Geodetic Survey 
Chart 8227.) 
Existing project. Snettisham is a multi-stage power 
project. The initial stage of the initial phase which was 
completed in 1977 tapped Long Lake and included an 
underground powerhouse with two 23.4 megawatt units 
and a transmission line to Juneau, AK. The project was 
turned over to the Alaska Power Administration for 
operation and maintenance. The second stage which is 
under construction, will provide a tunnel to Crater Lake 
and add a third unit. The final phase will provide a dam 
on Long Lake to increase storage and the energy capability 
of Long Lake. The Long Lake Dam is currently 
unscheduled. The existing Long Lake (elevation 815 
feet) water is transported through an approximately 
horizontal 13-foot diameter tunnel 8,400 feet long and a 
1,400-foot penstock dropping at a 46 degree angle to the 
underground powerhouse at tidewater to drive two turbines 
with a combined generating capacity of 47,600 
kilowatts. Power from two generators is supplied to 
Juneau by a 13.8 kilovolt overhead transmission line 
and a submarine cable traversing Taku Inlet. The Crater 
Lake stage of construction provides for tapping Crater 
Lake (elevation 1,022 feet) to drive a third turbine to be 
installed in the existing underground powerhouse to 
provide an additional nameplate-rated generating 
capacity of 34,500 kilowatts. Estimated cost of initial 
phase construction is $132,000,000. 
Local cooperation. None required. 
Operations during fiscal year. New work: Engineering 
and design is continuing on the remote supervisory 
control and data accumulation contract, on the 
voltage surge equipment, and the trash rack contract. A 
study to determine the economic viability of proceeding 
with the development of the Long Lake Dam was completed. 
It concluded that the dam should continue to be 
deferred until the need for additional power in Juneau is 
more pressing. The initial construction contract of the 
Crater Lake Phase II was awarded August 1986. Work 
performed under the contract includes completion of the 
power tunnel, excavation of a surge shaft a gate shaft 
with access adit, performing a lake tap; installation of a 
penstock, turbine an sperical valve, governor, switchgear, 
and transformer; and completion of the 
powerhouse. 
General Investigations 
17. SURVEYS 
Fiscal year costs for surveys include $146,162 for navigation 
studies, $1,220,744 for flood control studies, 
$31,723 for coordination studies and $109,205 for miscellaneous 
activities. 
18. COLLECTION AND STUDY OF BASIC DATA 
Technical assistance, information, flood plain management 
guidance and other flood plain management 
services have been provided to military and nonmilitary 
Federal agencies, local communities, State agencies, 
Architectural/Engineering firms, lending institutions 
and private individuals at a fiscal year cost of $108,093. 
Fiscal year costs for Hydrologic Studies were $11,076. 
19. PRECONSTRUCTION, ENGINEERING 
AND DESIGN 
Bethel Bank Stabilization, AK 
The proposed project would provide streambank protection 
to the city of Bethel, located in western Alaska on 
the Kuskokwim River. The recommended plan calls for 
rock riprap protection for 5,000 feet of river bank with 
the rock extending from above the active wave zone to 
the thalweg of the river. 
A Plan of Study was prepared for the General Design 
Memorandum in FY 1984. 
Work on the General Design Memorandum initiated 
in FY 1984 was completed in November 1987. Estimated 
preconstruction planning cost is $614,000. Fiscal year 
costs were $87,662. 
40-5 
I

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 40-A COST AND FINANCIAL STATEMENT 
See 
Section 
In Text Project 
1. Anchorage Harbor, AK 
2. Dillingham Harbor, AK 
(Contrib. Funds) 
3. Homer Harbor, AK 
(Contrib. Funds) 
4. Kake Harbor, AK 
Metlakatla Harbor, AK 
(Contrib. Funds) 
6. Nimilchik Harbor, AK 
7. Nome Harbor, AK 
(Contrib. Funds) 
9. Stikine River, AK 
-- FY 84 FY 85 FY 86 
1,679,000 1,185,725 1,102,000 
754,434 2,086,585 1,250,458 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
372,000 400,000 
421,969 393,395 
50,000 
49,655 
8,057,500 258,960 
8,010,237 275,719 
70,000 25,000 
85,533 34,887 
-229,000 75,000 
-204,702 17,134 
- 99,000 
- 13,839 
65,000 
63,991 
2,059 
15,000 
4,507 
67,698 
-1,000 
84,161 
- -206,827 150,923 
.- -- -. 
300,000 156,000 200,000 
302,425 155,806 197,723 
273,000 561,000 
367,979 407,142 
2,500 
10,000 
4,722 
5,000 
5,000 
22,000 
27,255 
1,195,045 
1,245,955 
2,500 
2,500 
I----- ~-----~--- -- I - 
40-6 
Total to 
FY 87 Sep. 30, 1987 
- 533,235 
- 533,235 
2,072,000 18,584,172 
2,008,806 18,518,280 
- 548,790 
- 548,790 
320,500 5,659,321 
331,159 5,652,931 
- 1,700 
- 1,700 
- 3,512,3502 
- 3,512,3502 
439,000 2,902,711 
435,194 2,897,482 
- 67,974 
- 67,974 
- 8,316,4603 
- 8,288,0153 
- 870,700 
8,757 865,701 
115,000 5,037,470 
75,668 4,987,968 
- 148,520 
- 148,520 
- 830,644 
- 772,096 
- 428,720 
- 428,720 
222,000 3,542,476 
211,162 3,529,153 
- 1,348,240 
- 1,348,240 
479,000 8,628,952 
465,606 8,490,391 
-125 
- 125 
2,500 162,500 
2,500 162,500 
13,000 196,364 
8,804 190,353 
350,000 
325,219 
1,723,000 
1,729,421 
70,000 
72,435

TABLE 40-A 
(Continued) 
ALASKA DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
In Text Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
10. Wrangell Harbor, AK New Work 
Approp. - - - - 537,020 
Cost - - - - 537,020 
Maint. 
Approp. - - - 75,000 406,352 
Cost - - - 45,319 376,671 
11. Chena River Lakes, AK New Work 
Approp. 4,656,300 7,103,000 3,478,000 7,200,000 207,195,7654 
Cost 5,349,609 7,114,257 3,590,751 6,819,420 206,783,9344 
Maint. 
Approp. 718,000 859,000 913,500 887,000 4,726,8245 
Cost 685,741 938,688 871,881 847,469 4,630,2655 
(Contrib. Funds) New Work 
Approp. 150,600 - - - 2,182,300 
Cost 522,722 6,767 - - 2,145,929 
12. Dillingham Emergency New Work 
Bank Stabilization, AK Approp. - - 20,000 -14,000 6,000 
Cost - - 5,419 581 6,000 
13. Galena Emergency New Work 
Bank Stabilization, AK Approp. - - 50,000 960,000 1,010,000 
Cost - - 45,420 64,755 110,175 
16. Snettisham, AK New Work 
Approp. 1,499,700 7,997,000 3,505,000 27,200,000 124,154,556 
Cost 1,258,244 8,226,946 3,561,846 17,964,165 114,898,644 
Ilncludes judgment and associated cost. 
2Includes $2,672 of Code 710 Rec. Funds and $1,509,678 for 
previous project. 
3Includes only actual Funds retained and cost incurred. 
4Includes $310,000 for previous project (Fairbanks). 
5Includes $1,624 for previous project (Fairbanks). 
40-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 40-B 
See Date 
Section Authorizing 
In Text Act 
1. 
2. 
3. 
4. 
5. 
6. 
7. 
AUTHORIZING LEGISLATION 
Project and Work Authorized 
ANCHORAGE HARBOR, AK 
July 3, 1958 Deep winter harbor, adjacent to docks, dredge to 35 
feet below mean lower low water, protected 
by two jetties.1 
Oct. 22, 1976 Extension of project limits. 
DILLINGHAM HARBOR, AK 
July 3, 1958 Basin 230,000 square feet in area with depth of 2 feet 
above mean lower low water along Scandinavian 
Creek, with entrance channel 1,100 feet long and 40 
feet wide. 
HOMER HARBOR, AK 
July 2, 1958 Basin 2.7 acres in area with depth of 12 feet below 
mean lower low water, and rock breakwater 1,260 feet 
long. 
Aug. 19, 1964 Relocation and rehabilitation of project destroyed by 
March 27, 1964 earthquake, by construction of basin 
10 acres in area with 12-foot depth over 2.75 acres 
and 15-foot depth over 7.25 acres protected by rock 
breakwaters, 1,018 feet and 238 feet long. 
July 14, 1960 Increased width and depth of entrance channel and an 
enlarged staging area. Basin enlarged from 16.5 to 
50 acres. 
Aug. 13, 1968 
Mar. 2, 1945 
Oct. 27, 1965 
KAKE HARBOR, AK 
Basin 7-acre berthing area, 15 feet deep, inclosed by a 
1,580-foot west rock breakwater and a 900-foot south 
rock breakwater. 
METLAKATLA HARBOR, AK 
Dredging small boat basin 2.18 acres in extent to a 
depth of 10 feet below plane of mean lower low 
water; construction of rubblemound breakwater 900 
feet long. 
Entrance channel and two rubblemound breakwaters 
inclosing a 7.0 acre basin. 
NINILCHIK HARBOR, AK 
July 3, 1958 Basin 320 feet long by 150 feet wide with depth of 
2 feet above mean lower low water, approach 
channel 400 feet long and 50 feet wide with depth of 
9 feet above mean lower low water, protected by 
410-foot jetty. 
NOME HARBOR, AK 
Aug. 8, 1917 Two jetties, easterly 335 feet and westerly 460 feet long 
revetment, channel and basin 200 feet wide and 250 
feet long. 
Aug. 30, 1935 Extension of the jetties and enlarging basin to 250 
feet wide and 600 feet long.; 
June 16, 1948 Seawall 
Documents 
H. Doc. 34, 85th Cong., 
1st Sess. 2 
P.L. 94-587 
H. Doc. 390, 84th Cong., 
2d Sess.2 
H. Doc. 34, 85th Cong., 
1st, Sess.2 
P.L. 88-451 
Section 107, P.L. 86-645 
Authorized by Chief 
of Engineers, 
Nov. 13, 1981 
S. Doc. 70, 90th Cong., 
2d Sess.2 
H. Doc. 138, 76th Cong., 
91st Sess. 
Section 201, P.L. 89-298 
S. Doc. 92-64, 92d Cong. 
2d Sess.2 Authorized 
Oct. 12, 1972 
H. Doc. 34, 85th Cong., 
1st Sess.2 
H. Doc. 1932, 64th Cong., 
2d Sess.2 
H. Doc. 404, 71st Cong., 
2d Sess., and Rivers 
and Harbors Committee 
Doc. 38, 73d Cong., 
2d Sess.2 
Report of Chief of 
Engineers dated 
March 8, 1948 
40-8

ALASKA DISTRICT 
TABLE 40-B 
(Continued) 
AUTHORIZING LEGISLATION 
'Purchase of dredge and deepwater jetties deauthorized 
November 6, 1977 under section 12, Public Law 93-251. 
2Contains latest published map. 
3Extension of jetties classified "inactive". 
4Little Chena Dam classified "deferred". 
40-9 
See Date 
Section Authorizing 
In Text Act Project and Work Authorized Documents 
9. STIKINE RIVER, AK 
Aug. 30, 1935 Snagging from mouth to Canadian border. H. Doc. 210, 72d Cong., 
1st Sess.2 
10. WRANGELL HARBOR, AK 
Sept. 22, 1922 Breakwater 300 feet long to protect southern H. Doc. 161, 67th Cong., 
portion of harbor. 2nd Sess. 
Aug. 30, 1935 Mooring basin 600 feet long, 400 feet wide, and H. Doc. 202, 72nd Cong., 
10 feet deep. 1st Sess. 
Mar. 2, 1945 Inner basin and connecting channel from the existing H. Doc. 284, 76th Cong., 
mooring basin, both 10 feet deep at mean lower low water, 1st Sess. 
and breakwater 320 feet long on the reef north of 
Snakes Island. 
11. CHENA RIVER LAKES, AK 
Aug. 13, 1968 Dam and reservoir on the main Chena River, a dam S. Doc. 89, 90th Cong., 
and detention reservoir on the Little Chena River, and 2d Sess.2 
a levee along the north side of the Tanana River.4 
12. DILLINGHAM EMERGENCY BANK 
STABILIZATI'ION, AK 
Dec. 19, 1985 Relocate Water and Sewer Lines Section 116 of P.L. 99-190 
(H.J. Res. 465) 
13. GALENA EMERGENCY BANK STABILIZANION, 
AK 
Dec. 19, 1985 Provide approximately 1200 feet of riverbank Section 116 of P.L. 99-190 
protection in front of the Alexander Lake area. (H.J. Res. 465) 
16. SNETTISHAM, AK 
Oct. 23, 1962 Multi-purpose dam, with powerhouse and transmission H. Doc. 40, 87th Cong., 
facilities. 1st Sess. 2

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Project Status 
Apoon Mouth of Yukon River, AK' 
Bar Point Harbor, AK2 
Cook Inlet Shoals, AK 
Cordova Harbor, AK 
Craig Harbor, AK 
Douglas Harbor, AK 
Dry Pass, AK 
Egegik River, AK 
Elfin Cove, AK 
Gastineau Channel, AK 
Haines Harbor, AK2 
Hoonah Harbor, AK 
Humboldt Harbor, AK 
Iliuliuk Harbor, AK 
Juneau Harbor, AK 
Kasilof Harbor, AK2 
Ketchikan Harbor, AK 
Kodiak Harbor, AK 
Myers Chuck Harbor, AK 
Naknek River, AK 
Neva and Olga Straits, AK 
Old Harbor, Kodiak Island, AK2 
Pelican Harbor, AK 
Petersburg Harbor, AK 
Port Alexander, AK 
Rocky Pass, AK 
St. Michael Canal, AK 
Seldovia Harbor, AK 
Sergius Whitestone, AK 
Seward Harbor, AK 
Sitka Harbor, AK 
Skagway Harbor, AK 
Valdez Harbor, AK 
Wrangell Narrows, AK 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed . 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Inactive 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
For Last 
Full Report 
See Annual 
Report For 
1920 
1983 
1977 
1978 
1983 
1963 
1983 
1972 
1959 
1964 
1977 
1983 
1977 
1941 
1974 
1975 
1979 
1973 
1970 
1961 
1960 
1972 
1964 
1972 
1949 
1960 
1916 
1974 
1973 
1973 
1973 
1972 
1968 
1979 
Cost to Sep. 30, 1987 
Operation 
and 
Construction Maintenance 
$ 128,896 
2,000,0003 
1,220,000 
843,534 
1,033,5004 
282,019 
943,351 
4,441 
154,191 
789,461 
1,000,0006 
4,255,0006 
3,679,6837 
66,037 
1,381,150 
109,848 
1,602,417 
1,891,2128 
9,700 
20,789 
155,009 
370,415 
369,683 
252,932 
17,000 
337,668 
377,062 
1,051,883y 
1,798,010 
712,36910 
1,611,009 
133,180 
649,74011 
3,562,343 
$ 2,154 
5,000 
488,156 
72,500 
23,466 
3,107 
102,701 
260,991 
331,256 
37,946 
132,946 
18,973 
26,800 
560 
5,518 
1,934 
219,789 
15,490 
32,665 
221,498 
309,260 
'Abandonment recommended in H. Doc. 467, 69th Cong., 
1st Sess. 
2Authorized by Chief of Engineers (Sec. 107). 
31n addition, $272,779 of State funds. 
4Includes $656,240 for Sec. 107 project. 
51In addition, $925,500 of State funds. 
6In addition, $973,875 of State funds. 
7In addition, $857 000 of State funds. 
8Includes $594,163 for rehabilitation. 
9Includes $400,000 for rehabilitation. 
'�Includes $90,026 for rehabilitation and $2,528 Code 710. 
Recreation Facilities at Completed projects. 
"Includes $73,000 for rehabilitation and $2,713 Code 710, 
Recreation Facilities at Completed projects. 
40-10 
TABLE 40-C OTHER AUTHORIZED NAVIGATION PROJECTS

REPORT OF THE SECRETARY OF THE ARMY ON CIWIL WORKS ACTIVITIES FOR FY 1987 
TABLE 40-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 1987 
Full Report Operation 
See Annual and 
Project Status Report For Construction Maintenance 
Fairbanks, Tanana River & 
Chena Slough, AK Completed 1943 557,000 - 
Gold Creek, AK Completed 1975 876,0061 4,301 
Klutina River, Copper Center, 
AK2 Completed 1973 260,681 - 
Lowell Creek, AK3 Completed 1945 416,3824 30,771 
Salmon River, AK Completed 1963 37,7705 6 162,9257 
Skagway River, AK Deferred8 1966 26,385 - 
Talkeetna River, AK Completed 1981 516,694 - 
'In addition, $25,000 expended from contributed funds. 
2Authorized by Chief of Engineers (Sec. 205). 
3During FY 87, $727,800 was made available from FC & 
CE. $31,044 spent for plans and specs. Contract to be awarded 
during FY 88. 
4In addition $25,000 expended from contributed funds. 
5Includes $34,197 of PWA funds. 
6In addition, 7,000 expended from contributed funds. 
7In addition, $2 400 expended from contributed funds. 
8Project eligible for deauthorization. 
TABLE 40-G
Project 
Anchorage Harbor, AK 
(Uncompleted Portion) 
Bradley Lake, AK 
Ketchikan Harbor, AK 
(West Breakwater) 
Port Alexander, AK 
(Inner Harbor) 
Tolovana River, AK 
(Snagging) 
DEAUTHORIZED PROJECTS 
For Last 
Full Report 
See Annual Date 
Report For Deauthorized 
1967 1977 
1983 
1979 
1949 
1931 
1982 
1979 
1977 
1977 
Federal 
Funds 
Expended 
$6,701,000 
Contributed 
Funds 
Expended 
40-11 
- -- -- ~------Y~------ -- 
- -- I

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 40-H NAVIGATION WORK 
UNDER SPECIAL AUTHORIZATION 
Navigation Activities Pursuant to Section 107, Public Law 86-645 
(Preauthorization) 
Study Identification 
Chignik, AK 
Dillingham Small Boat Harbor, AK 
Hooper Bay, AK 
Juneau Harbor, AK 
Larson Bay Small Boat Harbor, AK 
Mekoryuk, AK 
Mountain Point, AK 
Ouzinkie Small Boat Harbor, AK 
Sand Point, AK 
St. George Island, AK 
Saxman, AK 
Seward, AK 
Togiak Harbor, AK 
Trident Basin, Kodiak, AK 
Whittier, AK
TOTAL 
Fiscal Year Costs 
$ 20,248 
40,882 
36,411 
52 
93,209 
-112,739 
17,512 
34,338 
33 
12,962 
44,732 
29 
12 
10,000 
3,876 
$201,555 
PROJECT CONDITION SURVEYS 
Name of Project Date Survey Conducted 
ALASKA: 
Seward Harbor 
Ketchikan (Bar Point Harbor) 
Ketchikan (Thomas Basin) 
Metlakatla (New Harbor) 
Petersburg Harbor 
Wrangell Narrows 
Douglas Harbor 
Juneau (Aurora Harbor) 
Juneau (Harris Harbor) 
Humboldt Harbor 
October 1986 
January 1987 
January 1987 
January 1987 
February 1987 
February 1987 
March 1987 
March 1987 
March 1987 
June 1987 
40-12 
TABLE 40-I 
- I---~-I-~--

BOARD OF ENGINEERS FOR RIVERS AND HARBORS 
The Board of Engineers for Rivers and Harbors is a continuing 
body created by Section 3 of the 1902 River and 
Harbor Act. The board is selected by the Chief of 
Engineers and consists of seven senior engineer officers. 
The Deputy Chief of Engineers normally serves as chairman. 
Five members are division engineers with membership 
rotated among divisions having civil works missions. 
The seventh member, assigned full time to the board as 
Resident Member, also directs the staff in carrying out 
the responsibilities of the board. The board meets quarterly 
or on call of the chairman. 
The board has several statutory duties. It conducts independent 
reviews of corps survey reports covering water 
resources projects and reports its conclusions and recommendations 
to the Chief of Engineers. The Chief of 
Engineers then forwards the reports with his conclusions 
and recommendations to the Assistant Secretary of the 
Army (Civil Works) for transmission to the Congress. The 
board also conducts independent reviews of special 
reports ordered by the Congress. It considers and approves 
general plans for major modification and 
reconstruction of any lock, canal, canalized river or other 
work for the use or benefit of navigation. 
In addition to its statutory duties, the Chief of 
Engineers has assigned further duties to the board. It 
reviews coprs policies and procedures as directed, additional 
special reports for the Secretary of the Army and 
the Chief of Engineers, reports of other Federal agencies 
pertaining to water resources development as directed, 
and conducts a 10-month program of in-service training 
for approximately 15 corps planners annually - generally 
at GS 12 and 13 leves - in all aspects of federal water 
resources development. The training program helps meet 
corps needs for increased numbers of qualified people in 
the planning field. The board also has administrative 
responsibility for processing proposed reports of the Chief 
of Engineers, along with Final Environmental Impact 
Statements, to states and federal agencies for their 90-day 
review. 
In addition to other duties, the resident member of the 
board has served as second alternate for the Secretary 
of the Army on the Foreign-Trade Zones Board. The 
Secretary of the Army has also appointed the resident 
member to serve as his representative on the Committee 
of Alternates of the Foreign-Trade Zones Board and 
authorized him to act directly on the secretary's behalf 
on all nondiscretionary matters involving foreign-trade 
zones. This appointment relieves the Assistant Secretary 
of the Army for Civil Works of routine duties in this 
regard; however, discretionary matters concerning the 
Foreign-Trade Zones Board remain under previous 
delegations of authority. 
Total membership of the board is fixed by law at seven. 
In December 1982, the Chief of Engineers instituted a 
mechanism for predesignating future members, based on 
their time of service as division engineers, geographical 
factors, and other criteria. This procedure achieves a 
wider involvement of division engineers and their staffs 
with the proceedings of the board. Members Designate 
attend and participate in meetings of the board, but are 
not permitted to vote on board actions. 
The membership of the board as of September 1, 1987 
was as follows: 
Members: Major General Jerome B. Hilmes, Chairman, 
Division Engineer, Southestern, Dallas, TX 
Major General Thomas A. Sands, Division 
Engineer, Lower MIssissippi Valley, 
Vicksburg, MS 
Brigadier General (P) C. Ernest Edgar III, 
Division Engineer, South Atlantic, Atlanta, 
GA 
Brigadier General (P) Charles E. Williams, 
Division Engineer, North Atlantic, New 
York, NY 
Brigadier General Robert H. Ryan, Division 
Engineer, Missouri River, Omaha, NE 
Colonel (P) Ernest J. Harrell, Division 
Engineer Ohio River, Cincinnati, OH 
Colonel Robert B. Wilson, Resident Member, 
Board of Engineers for Rivers and Harbors, 
Fort Belvoir, VA 
Members Designate: Brigadier General Patrick J. 
Kelly, Division Engineer, South 
Pacific, San Francisco, CA 
Colonel Thomas A. Rhen, Division 
Engineer, New England, 
Waltham, MA 
Official Board Actions. In compliance with resolutions 
of Congress and instructions from the Chief of 
Engineers, the board completed 23 official report reviews 
during Fiscal Year (FY) 1987. 
The favorable reports category includes favorable 
recommended projects for federal construction as well as 
projects for solving water resources problems for major 
metropolitan areas, even though they may not include 
recommendations for construction by any agency of the 
federal government. 
Reports Recommending Favorable for Federal Construction: 
The board recommended 11 projects at an estimated 
total first cost of $840,723,000, of which $662,493,000 is 
the first cost to the United States. A listing of the projects 
follows: 
Scioto River, West Columbus, Ohio 
Clifton, Arizona 
Port Sutton Channel, Florida 
Cypress Creek, Texas 
Rillito River & Associated Streams, Tucscon, 
Arizona 
Mill Creek, Tennessee 
Winfield Locks and Dam, Kanawha River, West 
Virginia 
Claremont Terminal Channel, Jersey City, New 
Jersey 
Lower Mission Creek, Santa Barbara County, 
California 
West Bank, Mississippi R, Vic of New Orleans, 
Louisiana 
41-1

Reports Recommending Unfavorable for Federal Construction: 
During FY 1987, the board concurred in the 
unfavorable recommendations of the reporting officers for 
federal construction on 12 projects: 
Pleasure Island, Port Arthur, Texas 
Golden Gate Estates, Florida 
Biloxi Bay to East Harrison, Mississippi 
St. Croix River, Minnesota and Wisconsin 
Yort & Pamunkey Rivers, Virginia 
Mississippi River, Coon Rapids Dam 
Vermilion River Basin, Illinois 
Cuyahoga River Basin, Ohio 
Roanoke River, South Boston, North Carolina and 
Virginia 
San Luis Obispo County Streams, California 
Turkey Creek, Georgia 
General Design Memoranda: The board reviewed and 
submitted favorable recommendations on one General 
Design Memorandum during the reporting period: 
Chicagoland Underflow Plan, Illinois. 
During FY 1987, the board held three meetings: October 
7, 1986, March 11, 1987, and June 3, 1987. 
Since 1902, the board has acted on 8,772 reports, recommending 
favorably on 3,917 and unfavorably on 4,855. 
41-2

MISSISSIPPI RIVER COMMISSION* 
The Mississippi River Commission (MRC) was 
created by an act of Congress on Jun. 28, 1879. The 
Flood Control Act of May 15, 1928, authorized the 
Flood Control, Mississippi River and Tributaries 
(MR&T) Project. The Commission consists of three 
officers of the Corps of Engineers, one from the former 
Coast and Geodetic Survey (presently the National 
Oceanic and Atmospheric Administration), and three 
civilians, two of whom must be civil engineers. All 
members are appointed by the President with the 
advice and consent of the Senate. 
During the fiscal year the Commissioners were: MG 
Thomas A. Sands, U.S. Army, President, appointed 
May 10, 1985; Mr. Sam E. Angel, appointed Sept. 25, 
1979; Mr. R. D. James, civil engineer, appointed Dec. 
1, 1981; MG Jerome B. Hilmes, U.S. Army, appointed 
Nov. 21, 1983; RA John D. Bossler, NOAA, appointed 
Mar. 14, 1984; BG Robert J. Dacey, appointed May 
10, 1985; COL Dennis B. Bulger served as Secretary 
of the Commission. There is one civilian/engineer 
vacancy due to the death of Mr. Roy T. Sessums on 
Mar. 10, 1984. 
The MRC is charged, under direction of the 
Secretary of the Army and supervision of the Chief of 
Engineers, with prosecution of improvements for flood 
control of the Mississippi River and of its tributaries 
and outlets in its alluvial valley, so far as they are 
affected by Mississippi River backwater, between 
Head of Passes, LA (mile 0), and Cape Girardeau, MO 
(1,006 miles AHP-Lower Mississippi mileage 
terminates at mile 954 AHP), and with prosecution of 
improvements in the interest of navigation between 
Cairo, IL (954 miles AHP), and Baton Rouge, LA (234 
miles AHP); and for stabilization of the lower 7 miles 
of the right bank of the Ohio River, to former mouth of 
Cache River. It also is charged with prosecution of 
certain flood control works on the Mississippi River 
and tributaries, as far as they are affected by 
backwater, between Cape Girardeau, MO, and Rock 
Island, IL (1,437 miles AHP), and with prosecution of 
improvements on designated tributaries and outlets 
below Cape Girardeau for flood control, navigation, 
major drainage, and related water uses. Authorized 
operations of the Commission below Cape Girardeau 
are conducted by District Engineers of New Orleans, 
Vicksburg, and Memphis Districts within the areas 
described below, in accordance with approved 
directives and programs and congressional appropriations 
therefor. 
New Orleans District: Mississippi River project 
levees and river channel stabilization as required from 
Head of Passes, mile 0 to 320 AHP, construction of four 
salinity-control structures for fish and wildlife enhancement 
in lower Mississippi River Delta region; 
Bonnet Carre' and Morganza Floodways; maintenance 
and improvements of Mississippi River navigation 
channel from Baton Rouge, LA (mile 234 AHP), to 
mile 320; Baton Rouge Harbor (Devils Swamp); 
navigation improvement of Atchafalaya and Old 
Rivers from Mississippi River to Morgan City; control 
of Old and Atchafalaya Rivers; Atchafalaya Basin 
Floodways; flood control and drainage improvements 
in Bayou Cocodrie and tributaries, in Bayou des 
Glaises, and in Upper Pointe Coupee Loop area; flood 
protection in eastern Rapides and south-central 
Avoyelles Parishes, LA; and freshwater distribution 
from Atchafalaya River to Teche-Vermilion Basins. 
Vicksburg District: Mississippi River project levees 
and river channel stabilization as required from upper 
limits of New Orleans District (mile 320 AHP) in 
vicinity of Black Hawk, LA, to Coahoma-Bolivar 
County line, MS (mile 620 AHP) on left bank, and to 
vicinity of mouth of White River, AR (mile 599 AHP), 
on right bank including south bank Arkansas River 
levee to vicinity of Pine Bluff, AR, and north bank 
levee to vicinity of Tucker on left bank of Plum Bayou, 
AR; bank stabilization in lower 36.1 miles of Arkansas 
River; maintenance and improvement of Mississippi 
River navigation channel between miles 320 and 599 
AHP; Vicksburg and Greenville Harbors; specific fish 
and wildlife facilities in Tensas, Yazoo, and Big Sunflower 
Basins; a demonstration erosion control project 
in the Yazoo Basin; flood control and drainage 
improvements in Red River backwater area including 
leveed portions east and west of Black River and south 
of Red River; Jonesville, LA, Boeuf and Tensas Rivers, 
Bayou Macon Basins and tributaries, AR and LA, and 
Bayou Lafourche, LA; Yazoo River Basin, MS, including 
backwater area; Big and Little Sunflower Rivers, 
Deer Creek, and Steele Bayou, MS; and Grand Prairie 
Region and Bayou Meto Basin, AR, including provision 
for agricultural-water supply. 
Memphis District: Mississippi River project levees 
and river channel stabilization as required, from 
upper limits of Vicksburg District to north bank of 
Little River diversion channel, MO (1,003 miles AHP), 
a few miles below Cape Girardeau, MO, on right bank, 
and to Cache River diversion channel (967 miles AHP) 
* Authorizing legislation (Tables 42-D and 42-E) is listed at the end of this chapter. All other tables are referenced in text and also appear 
at the end of this chapter. 
42-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
above Cairo, IL, on left bank, including levees and 
revetment on right bank of Ohio River, in Mounds- 
Mound City area, IL; except operations above Cairo, 
IL, do not include channel stabilization on the 
Mississippi River. Maintenance and improvement of 
Mississippi River navigation channel between mile 
599 and 954 AHP and of Memphis Harbor, TN; 
specific fish and wildlife facilities in St. Francis Basin; 
levees in White River backwater area up to vicinity of 
Augusta, AR, and a pumping plant near mouth of 
White River; levees and pumping plants at De Valls 
Bluff and Des Arc, AR; channel improvements in 
Cache River Basin, AR; channel improvements in Big 
Creek and tributaries, AR; improvement works in St. 
Francis River Basin, MO and AR, including 
backwater area improvements in Belle Fountain Ditch 
and Drainage District No. 17, AR; Little River 
diversion channel, MO, and L'Anguille River, AR; 
Wolf River Basin, TN; Obion and Forked Deer River 
Basins, TN; Reelfoot Lake area, including channel 
improvement for Bayou du Chien and Lake No. 9, TN 
and KY; West Kentucky tributaries, KY; Mud Lake 
pumping station, TN; and pumping plants and outlet 
structures in the Cairo-Mounds-Mounds City area, IL. 
Field operations of the Commission restricted to 
levee construction under Sec. 6, 1928 Flood Control 
Act (local interests contributing one-third of costs and 
furnishing rights-of-way) are conducted within the 
following limits by two districts reporting directly to 
the Commission on matters within their jurisdiction- 
St. Louis District: Mississippi River (Sec. 6) levees 
from upper limits of Memphis District to Clemens 
Station, MO (1,254 miles AHP), on right bank, and 
Hamburg Bay, IL (1,215 miles AHP), on left bank, and 
Illinois River from its mouth to mile 120 at Havana, 
IL. Rock Island District: Mississippi River (Sec. 6) 
levees from upper limits of St. Louis District to Rock 
Island, IL (1,437 miles AHP). For work accomplished 
see Table 42-N, page 42-50, Annual Report for 1975. 
MISSISSIPPI RIVER AND 
ALLUVIAL VALLEY BELOW 
CAPE GIRARDEAU, MO. 
Location and description. The Mississippi River 
rises in Lake Itasca, MN, and flows generally 
southerly for 2,340 miles through the central portion of 
United States to empty into the Gulf of Mexico 1.15 
miles below New Orleans. It is improved for barge 
navigation for 1,832 miles to Minneapolis, MN. The 
Mississippi River and its major tributaries, the 
Missouri, Ohio, St. Francis, White, Arkansas, Yazoo, 
and Red-Old Rivers, drain 1,245,000 square miles in 
all or part of 31 states between the Rocky and 
Appalachian Mountains and part of two Canadian 
provinces. Below Cape Girardeau, MO, 53 miles above 
Ohio River, river bottomlands widen abruptly into an 
alluvial valley of 35,460 square miles which was 
originally subjected to flood overflow. A major part of 
the alluvial valley has been protected from floods by 
levees which confine floodflows within a floodplain 
having an average width of 5 miles. (See map of 
alluvial valley of Mississippi River, scale 1:500,000.) 
Observations made by Mississippi River Commission 
to Sep. 30, 1982, show approximate all-time maximum 
and minimum discharges between levees as follows: 
Cairo to White River, 2,000,000 and 70,000 cubic feet 
per second; thence to Red River, 2,150,000 and 90,000 
cubic feet per second; thence to the Gulf of Mexico, 
1,500,000 and 50,000 cubic feet per second in 
Mississippi River and 660,000 and 11,000 cubic feet 
per second in Atchafalaya River. As the 1927 floodflow 
was not confined between levees, maximum discharges 
recorded do not include entire flow of the 1927 flood, 
maximum of record below White River. High water 
and flood stages usually occur in late winter or early 
spring, but great floods such as that of 1937 occurred 
as early as January. Low water stages generally 
prevail from August to December. Extreme all-time 
ranges in stages recorded at representative gages 
(rounded to nearest foot) are 60 feet at Cairo, 49 feet at 
Memphis, 57 feet at Red River Landing, and 21 feet at 
New Orleans (Carrollton). The river is nontidal above 
Red River Landing where tidal amplitude rarely 
exceeds 0.1 foot during extreme low water. 
Previous projects. For details see page 1944, 
Annual Report for 1932. 
Existing project. The Mississippi River and Tributaries 
Project in the alluvial valley between Head of 
Passes, LA, and Cape Girardeau, MO, provides protection 
from floods by means of levees, floodwalls, 
floodways, reservoirs (in Yazoo and St. Francis 
Basins), bank stabilization, and channel improvements 
in and along the river and its tributaries and outlets 
insofar as affected by backwater of Mississippi River, 
including levee work on the main stem between Cape 
Girardeau and Rock Island. When completed, 23,621 
square miles will be protected from the Mississippi 
River project flood. The project also provides for a 12- 
by 300-foot navigation channel between Baton Rouge, 
LA, and Cairo, IL; for salinity-control structures; and 
for channel realinement and improvement including 
bank stabilization and dikes to reduce flood heights, 
control natural tendency of river to lengthen by 
meandering, and protect levees from being destroyed 
by caving banks. Locations of major main stem 
Mississippi River improvements are shown in Table 
42-A and those for off-main stem tributaries are shown 
in Table 42-B. Pertinent data on dams and lakes are 
shown in Table 42-C. Authorizing and incorporating 
legislation are shown in Tables 42-D and 42-E. 
Summary of presently estimated Federal cost of 
authorized improvements is shown in Table 42-F. 
Construction of the existing project began in 1928 and 
has continued throughout ensuing years. Based on the 
estimated cost of $9,902,820,000 (Cost projected 
through the construction period), and actual expenditures 
through Sep. 30, 1987, of $4,312,752,917, the 
entire project is about 79.2 percent complete. 
Recommended modifications. None. 
Local cooperation. The Flood Control Act of 1928, 
42-2

MISSISSIPPI RIVER COMMISSION 
as amended, applies. Such requirements have, in general, 
been complied with by local interests. 
Terminal facilities. See Port Series No. 21, 1979/ 
1982, for Ports of Baton Rouge and Lake Charles, LA; 
Port Series No. 20, 1981, for Port of New Orleans, LA; 
also folio of Flood Control and Navigation Maps of 
Mississippi River from Cairo, IL, to the Gulf of Mexico 
(54th edition), 1986. 
Project cost. Total allotted for flood control, including 
maintenance charges through Aug. 18, 1941, chargeable 
under authorizations to Sep. 30, 1987, was 
$4,358,618,837. (See Table 42-S.) (See also Tables 42- 
R, 42-T, and 42-U for additional financial statements.) 
Operations and results during fiscal year. Commission 
activities: 
The 329th Session was held on April 27 through May 
1, 1987, on board the Motor Vessel MISSISSIPPI 
enroute on the Mississippi River from Cairo, IL, to 
New Orleans, LA. Bank protection works, levees and 
channel conditions were observed enroute. Public 
meetings were held at Cairo, IL; Memphis, TN; Greenville, 
MS; and New Orleans, LA, with approximately 
160 people in attendance. This session adjourned at 
New Orleans, LA, at 10:00 a.m. on May 1, 1987. 
The 330th session was held on September 14 through 
September 18, 1987, on board the Motor Vessel MISSISSIPPI 
enroute on the Mississippi River from Cairo, 
IL, to Morgan City, LA. On September 15 the Commission 
and staff viewed a sinking unit in operation 
at the Rescue Landing, AR. On September 17, Commission 
members and staff toured and were briefed 
on the Old River Control Structure and on September 
18 had an aerial inspection of the Atchafalaya Basin 
and area. Public meetings were held at Cairo, IL; 
Memphis, TN; Vicksburg, MS; and Morgan City, LA, 
with approximately 175 people in attendance. At 10:05 
a.m., September 18, 1987, the 330th Session adjourned 
at Morgan City, LA. 
Records of Proceedings of all sessions of the Mississippi 
River Commission are on file in the office of 
the President. 
Alluvial Valley Mapping 
General. Contoured quadrangles and general maps 
of the alluvial valley are available for departmental 
use and public distribution under prescribed regulations. 
Preparation, revision, and publication of quadrangle 
maps (scale 1:62,500) continued. Road-maptype 
information brochures of principal portions of the 
overall project were published along with pamphlets 
on the subject of flood control and navigation. Maps 
and supplemental data sheets for active works were 
updated and published as required. 
The 1986 (54th) edition of the folio of flood control 
and navigation maps (scale 1:62,500) covering the 
Mississippi River from Cairo, IL, to the Gulf of Mexico 
was revised and printed. The 1987 (1st) edition folio 
of flood control and navigation maps (scale 1:24,000) 
covering the Atchafalaya River was revised and 
printed. 
Approximately 120 flight-line miles of infra-red 
color; 6,266 flight-line miles of black-and-white aerial 
photography (various scales); 10 flight-line miles of 
color photography; and about 223 hours of oblique 
photography were flown along the Mississippi River 
and tributaries in the New Orleans, Vicksburg, and 
Memphis Districts. 
Work accomplished in the Districts: New Orleans 
District--Revision of Breton Sound Map, 1:250,000- 
scale was completed and will be printed. 
Memphis District--Series conversion of USGS 
1:24,000 scale to 1:62,500 scale quads of Evadale, Dee, 
Mellwood, Latour, Jonesboro, Vanndale and Wynne 
are complete. 
Vicksburg District-Series conversion of U.S. Geological 
Survey 1:24,000-scale quadrangles to 1:62,500- 
scale quadrangles of McCarley, MS; Water Valley, 
MS; Ingalls, AR; Bearden, AR; and Hampton, AR, is 
in progress. Horn Lake, MS; Crenshaw, MS; Sledge, 
MS; Crowder, MS; Oakland, MS; Grenada, MS; Princeton, 
AR; Camden, AR; and Warren, AR, were 
completed. 
Floods 
Streamflow observations during the fiscal year 
follow: 
Memphis District--Mississippi River crest stage of 
42.1 feet at Cairo gage on Apr. 19, 1987, and maximum 
discharge of 892,000 cubic feet per second, occurred 
on Apr. 19, 1987, at Hickman, KY and crest stage of 
24.8 feet at Memphis on Mar. 23 and Apr. 22, 1987, 
with maximum discharge of 927,000 cubic feet per 
second on Mar. 8, 1987. 
Vicksburg District--No significant flooding 
occurred in the Vicksburg District during FY 87. 
Peak stages and discharges on the Vicksburg District's 
reach of the Mississippi River were as follows: 
Arkansas City - 30.1 feet on Mar. 11, 1987, and maximum 
discharge of 1,190,000 cubic feet per second; 
Vicksburg - 36.5 feet on Mar. 13, 1987, and maximum 
discharge of 1,230,000 cubic feet per second; and 
Natchez - 44.1 feet on Mar. 14, 1987, and maximum 
discharge of 1,200,000 cubic feet per second. 
New Orleans District--On the Mississippi River, the 
Red River Landing gage recorded a maximum stage 
of 47.93 feet NGVD on Mar. 15, 1987, and the New 
Orleans gage recorded a maximum stage of 14.0 feet 
NGVD on Mar. 17, 1987. On the Atchafalaya River, 
the Simmesport gage recorded a maximum stage of 
30.5 feet NGVD on Mar. 14, 1987. 
Studies and Investigations 
General investigations. Surveys and reports, 
authorized by laws and by Senate and House Public 
42-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Works Committee resolutions, were made as required. 
Collection and study of basic data continued. No 
requests were received for modifications of the existing 
project, Mississippi River and Tributaries, authorized 
by the Flood Control Act of May 15, 1928, as 
amended (see Table 42-D). 
Bayou Du Chien, KY Feasibility Report-The President, 
MRC, on Jul. 25, 1987, concurred with the 
Memphis District's finding that the study be terminated 
and the study resolution be closed since no 
economically feasible plan could be implemented by 
the Corps. 
Engineering studies. A research program was continued 
for development of materials and more effective 
and economical design of regulation features for placing 
and stabilizing the Mississippi River in a suitable 
alinement. 
Potamology investigations of river behavior continue 
to be made. Investigations into the major causeand-
effect relationships attributable to major changes 
in stage-discharge relationships on the Mississippi 
River as a result of both natural and man-made modifications 
are continuing. 
Mississippi River and Tributaries-Levees 
Operations and results during fiscal year. This 
feature consists of construction of new, and enlargement 
of existing, levees to approved grade and section; 
construction and restoration of levee berms; and construction, 
repair, and maintenance of roads on levees. 
Work accomplished is summarized in Table 42-N and 
further broken down as follows: 
New Orleans District-Enlarged 14.1 miles of levees 
and surfaced 14.1 miles of roads on levees in the Main 
Stem System. See Table 42-K. 
Vicksburg District-Constructed 2.3 miles of berms 
and enlarged 2.5 miles of levees in the Main Stem 
System. See Table 42-L. 
Memphis District-Constructed 2.6 miles of berms 
in the Main Stem System. See Table 42-M. 
Condition as of Sep. 30. (See Tables 42-K, 42-L, 
42-M, and 42-N.) There are 1,608.3 miles of levees 
authorized for the Mississippi River below Cape Girardeau, 
of which 1,601.5 are in place with 1,186.1 built 
to approved grade and section. The Main Stem Levee 
System consists of 2,202.1 miles, of which 2,195.3 are 
in place with 1,625.6 miles completed to approved 
grade and section. Included in this system are additional 
levees and structures along the south bank of 
Arkansas River (85.4 miles); along the south bank of 
Red River (59.2 miles, with 59.2 completed); and 449.2 
miles in the Atchafalaya River Basin, with 449.2 in 
place with 294.9 completed to grade and section (see 
Table 42-N). Of the authorized 723.4 miles of berms, 
513.1 are complete. Graveled or hard-surfaced roads 
have been constructed on 1,814.6 miles of these levees. 
There are an additional 1,608.2 miles of authorized 
tributary levees in the MR&T Project, of which 1,120.0 
are in place with 895.1 to approved grade and section. 
Berms have been completed on 9.8 miles and 811.7 
miles of graveled or hard-surfaced roads have been 
constructed on the levees. 
For last summary of levee work accomplished under 
Sec. 6, 1928 Flood Control Act, see Table 42-N, pages 
42-50, Annual Report for 1975. 
Mississippi River and Tributaries- 
Channel Improvements 
Operations and results during fiscal year. Dredging: 
Mississippi River Main Stem-(See Table 42-G). 
Work included dredging 29,781,300 cubic yards for 
maintenance of channel and harbor improvements. 
Minimum channel depth of 9 feet was maintained. 
Dredging was done with the following plant: New 
Orleans District, Baton Rouge Harbor (Devil's 
Swamp) was maintained by Unit Price dredge 
Galveston. Vicksburg District, channel maintenance 
was performed by government-owned dustpan dredge 
Jadwin and leased dustpan dredge Lenel Bean. The 
MR&T Harbors, in the Vicksburg District, maintained 
were Greenville and Vicksburg by leased cutterhead 
dredge George D. Williams and the leased 
cutterhead dredge Pontchartrain. Memphis District 
channel maintenance dredging was performed by 
Government-owned dustpan dredge Burgess, leased 
cutterhead dredge Natchez, and leased dustpan dredge 
Lenel Bean. 
The MR&T Harbor maintained was Memphis Harbor 
(MCKeller Lake). 
Bank revetment and dikes: (See Table 42-H, 42-I, 
and 42-J.) Construction of 12.85 miles of new bank 
revetment and 115,936 squares of concrete mattress, 
for maintenance, along the Mississippi River was completed 
by Government plant and hired labor. Also, 1.23 
miles of new dikes were constructed and 5.2 miles 
required for maintenance. 
In addition, work on tributaries consisted of 3.26 
miles of new bank revetment and 0 squares of concrete 
mattress for maintenance. 
Other work performed in the interest of navigation, 
supplementing maintenance dredging on Mississippi 
River between Cairo, IL, and Baton Rouge, LA, included 
removal of snags, wrecks, and obstructions; 
issuance of bulletins by the Vicksburg District providing 
information on available high-water velocities 
at selected locations; maintenance of bulletin boards 
showing daily gage readings at regular MRC gages; 
and contact pilot service furnishing navigation interests 
with latest information and advice on channel 
conditions and navigation interests. Cost of this work 
is given in Table 42-R. 
Condition as of Sep. 30. In carrying out authorized 
channel improvement program between Baton Rouge 
and Cairo, 16 cutoffs were developed between 1933 and 
1942. These, combined with chute channel development 
and alignment improvements, decreased channel 
length between these cities by about 170 miles. 
42-4

MISSISSIPPI RIVER COMMISSION 
However, current velocities increased the attack on the 
banks and the river began to regain its length. As a 
result, the net shortening between 1933 and 1962 was 
114 miles of the theoretical 170-mile cutoff. 
There are now in place 878.41 miles of operative 
bank revetment and 215.54 miles of dikes on the lower 
Mississippi River. This amount of channel stabilization 
should prevent the river from regaining much 
more of its length due to meandering. A navigation 
channel 9-by 300-feet is being accomplished by revetment 
and dikes and maintained by dredging as 
required during the low-water season. Due to growing 
effectiveness of channel improvement program, average 
maintenance dredging requirements are steadily 
being reduced, and an increase in navigable depth is 
being obtained. Approximately 99.8 miles of foreshore 
protection have been constructed along the lower Mississippi 
River. 
There are 68.23 miles of revetment and 5.2 miles 
of dikes on tributary channels as listed in Tables 42- 
H, 42-I, and 42-J. 
New Orleans District 
ATCHAFALAYA BASIN, LA 
Operations and results during fiscal year. New 
work by hired labor: Real estate activities and planning 
for construction were continued. 
New work by contract: Construction of floodside and 
landside berms and levee enlargement continued on 
the east and west protection levees. One contract on 
the west protection levee was completed over a distance 
of 3.8 miles with placement of 449,000 cubic 
yards; and on the east protection levee, one contract 
for 1.2 miles of steel sheet piling was completed. A 
contract for a composite earthern/sheet pile closure of 
the Bordelonville floodgate was also completed with 
placement of 30,000 cubic yards. On the west protection 
levee four all-earth levee contracts, totaling 20.4 
miles, are under construction with placement of 
2,958,000 cubic yards during this period. A contract 
for a composite floodwall/levee totaling a distance of 
1.3 miles is also under construction on the west protection 
levee. On the east protection levee 11.7 miles 
of levee enlargement and floodside and landside berms 
are under construction with placement of 145,000 
cubic yards during this period. Contract for the new 
Morgan City floodwall, north of Brashear Avenue, was 
completed Dec. 19, 1986. A contract for construction 
of the Wax Lake Outlet control structure was awarded 
at a cost-of$-3,531,460 and construction is underway. 
Maintenance by hired labor: Operation and maintenance 
of Bayou Boeuf, Berwick, and Bayou Sorrell 
Locks, Morganza Control Structure, the West Atchafalaya 
Basin protection levee borrow pit, and numerous 
drainage structures as required, condition and 
operation studies, and water control management. 
Maintenance by contract: Maintenance contracts for 
replacement of the Charenton floodgate bridge and 
replacement of timber guidewalls at Bayou Sorrel lock 
were awarded on Aug. 12 and Aug. 14, 1987, 
respectively. 
Maintenance dredging was performed, resulting in 
the removal of 2,000,000 cubic yards by one leased 
cutterhead dredge from Berwick Bay harbor between 
June and August 1987; and removal of 125,000 cubic 
yards by leased cutterhead dredge from Three Rivers 
during August 1987. 
Condition as of Sep. 30. Construction was initiated 
Aug. 7, 1929, with commencement of the west protection 
levee from Bordelonville to Hamburg, LA. The 
project is 74 percent complete, based on the current 
estimated Federal cost of $1,460,000,000 and non- 
Federal cost of $8,000,000. Of the 449.2 miles of levees 
and floodwalls authorized for the Atchafalaya system, 
294.9 miles are built to grade. See Table 42-K for 
status of levees. 
Major items remaining to be completed include 
completion of levees to grade and section, channel 
training works in the lower basin, control of distribution 
of flows through Wax Lake Outlet, and construction 
of two freshwater distribution structures. 
Approximately 36.7 miles of bank stabilization have 
been placed as shown in Table 42-H. 
BATON ROUGE HARBOR 
(DEVILS SWAMP), LA 
Operations and results during fiscal year. Maintenance 
by contract: Dredging for the removal of shoal 
from the entrance channel was performed, resulting 
in the removal of 145,508 cubic yards between Aug. 
30 and Sep. 6, 1987. 
Condition as of Sep. 30. Construction of the first 
2.5 miles of the proposed 5.0 miles of channel was 
initiated in January 1958 and completed in July 1959, 
with 7,458,086 cubic yards excavated. 
The project is 16 percent complete, based on the 
current estimated Federal cost of $699,200 and cash 
contributions of $650,000. Completion of the remaining 
2.5 miles is dependent on economic justification 
by developments on the initial channel. 
BAYOU COCODRIE AND TRIBUTARIES, LA 
Operations and results during fiscal year. Maintenance 
by hired labor consisted of water control 
management. 
Condition as of Sep. 30. Construction was initiated 
in June 1946 and is 57 percent complete, based on the 
current estimated Federal cost of $26,500,000 and non- 
Federal cost of $323,000. See page 2031, Annual 
Report for 1961, for description of completed work. 
Work required to complete the project consists of 
enlargement of 13.5 miles of upper Bayou Boeuf, 
42-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
channel improvement of 25.3 miles of Bayou Cocodrie, 
enlargement of Bayou Courtableau from Washington, 
LA, to the west protection levee, and additional culverts 
through the west protection levee at 100 percent 
Federal cost in lieu of the previously authorized diversion 
channel from Washington to the Bayou Courtableau 
drainage structure. 
BONNET CARRE' SPILLWAY, LA 
Operations and results during fiscal year. Maintenance 
by hired labor: Condition and operation studies, 
water control management, and ordinary 
maintenance of the control structure and spillway 
continued. 
Condition as of Sep. 30. Construction of the spillway 
was initiated in Fiscal Year 1929. The control 
structure was completed in 1931, levees were completed 
in 1932, and utility crossings were completed 
in 1936. The cost of the completed work is $14,212,200. 
It was necessary to operate the structure to reduce 
flood stages in 1937, 1945, 1950, 1973, 1975, 1979, and 
1983. 
OLD RIVER, LA 
Operations and results during fiscal year. New 
work by hired labor consisted of engineering studies 
and placement of stone bank paving in the auxiliary 
structure inflow channel. 
New work by contract: Stone bank paving in the 
auxiliary structure inflow channel was completed 
Aug. 6, 1987, with 405,443 tons of stone placed. 
Maintenance by hired labor consisted of operation 
and maintenance of the lock and control structures as 
required, condition and operation studies, water control 
management, maintenance of cleared areas, levee 
shaping, operation of a picket boat at the inflow channels 
to the low-sill and auxiliary control structures, 
and engineering studies. 
Maintenance by contract: From Aug. 21 to 28, 1987, 
174,604 cubic yards of shoal were dredged from the 
lock forebay. From June to September 1987, gate rail 
repairs and stilling basin dewatering, inspection, and 
repair were perforemd at the low sill structure. 
Condition as of Sep. 30. Construction began September 
1955 and is complete at a Federal cost of 
$306,000,000. Principal items completed are as-follows: 
Low-sill structure, June 1959; overbank structure, 
October 1959; auxiliary structure, September 
1986; levees and levee enlargements, October 1963; 
inflow and outflow channels for the low sill structure, 
February 1961; inflow and outflow channels for the 
auxiliary structure, August 1987; navigation lock completed 
December 1962 and opened to navigation 
March 1963, at which time Old River was closed to 
navigation with a rock and earthfill dam; highway 
approaches and bridge over the lock completed March 
1965. Approximately 9.4 miles of bank protection have 
been constructed at the inflow and outflow channels. 
(See Table 42-H for details of bank protection.) 
Vicksburg District 
TENSAS BASIN, ARK AND LA 
Operations and results during fiscal year. 
(a) Boeuf and Tensas Rivers, and Bayou Macon, 
AR and LA. Planning and design were continued on 
project features. The Lake Chicot Pumping Plant and 
related features are complete and in operation, except 
for the Rowdy Bend recreational facility; awarded in 
FY 87, and two future recreational sites. 
(b) Red River backwater area. Planning and 
design continued on project features. All channel work 
required to get flows to the Tensas Cocodrie Pumping 
Plant and gravity structure is complete. The gravity 
structure is complete and the pumping plant was 
completed on Jun. 5, 1987. Structural mitigation features 
for this project are scheduled to be constructed 
in FY 87, FY 88, and FY 89. Design and right-ofway 
acquisition are continuing for the remainder of 
the Tensas-Cocodrie levee enlargement. An 8A contract 
has been completed for construction of the 1.5- 
mile connecting channel and drainage structure at the 
Six Mile Bayou Project. A contract for Sicily Island 
Item 1A is complete. Item 1A includes 1.0 mile of levee 
and a water control structure (two 60" pipes). An 8A 
contract for construction of Item 1B which included 
2.8 miles of levee, has also been completed. Preparation 
of the Fool River Bayou Pumping Plant design 
document is being initiated. Work on the Below Red 
River Phase II GDM is under way. 
Condition as of Sep. 30. 
(a) Boeuf and Tensas Rivers, and Bayou Macon, 
AR and LA. Channel improvement has been accomplished 
on 741.7 miles of project streams, providing 
major drainage outlets for the tributary areas. Additionally, 
61.0 miles of the Tensas River has been 
cleared and snagged. A Reevaluation report for the 
Tensas River Project, above mile 61.0, and the Mill 
Bayou-Bayou Vidal project has been completed and 
work on the GDM is under way. 
(b) Red River backwater area. Levees in Tensas- 
Cocodrie area are complete except for levee raising 
of 12.7 miles. The work comprised 93.1 miles of new 
levee, excluding 2.1 miles of high ground where no 
levees are required, and 86.9 miles of gravel road on 
levees. Construction of 63.4 miles of levee, Larto Lake 
to Jonesville levee system, has been completed. A levee 
grade reevaluation study for all levee systems in the 
Red River Backwater area was completed in Mar. 
1985. Based on results of that study, work is underway 
to complete enlargement of the Tensas-Cocodrie levee 
system. 
42-6

MISSISSIPPI RIVER COMMISSION 
LOWER ARKANSAS BASIN, AR 
Condition as of Sep. 30. Arkansas River levees. 
A total of 56.2 miles of the 61.5 miles of north bank 
levees and all of the 85.4 miles of south bank levees 
have been completed to approved grade and section. 
These levees above mile 36.1 are protected by bankprotection 
works constructed as a feature of project 
for Arkansas River and tributaries, AR and OK. For 
present status of this work, see report of Little Rock 
District. Below mile 36.1, needed bank protection is 
constructed with project maintenance funds. 
YAZOO BASIN, MS 
Operations and results during fiscal year. 
(a) Yazoo City and Belzoni protection works. 
Contract forces continued operation and maintenance 
of levees, drainage facilities, and pumping plant. 
(b) Greenwood protection works. Contract forces 
continued operation and maintenance of pumping 
plant, levees, and drainage facilities. 
(c) Main stem. Construction of the Bee Lake Drainage 
Structure is 96 percent complete. Design is underway 
to provide levee closure at Bee Lake. Main Stem 
construction is continuing for bank stabilization at 
Greenwood Bendway Site 3, which was awarded in 
FY 86. Construction of additional bank stabilization 
works along the Greenwood Bendway continues at 
Sites 4 andd 5, which were awarded on Nov. 13, 1986, 
and May 29, 1987, respectively. A contract was 
awarded on Sep. 22, 1987, for $221,728 for Tallahatchie 
River Site 1 Bank Stabilization. 
Contract forces continued operation and maintenance 
of channels, levees and drainage facilities. 
(d) Big Sunflower River, etc. A contract was 
awarded Oct. 31, 1986, on Item 66-A, Steele Bayou 
Channel Improvement, Miles 63.0 to 68.7. The next 
item of work is scheduled for award in March 1988. 
(e) Tributaries. Construction: (1) Levees. Levee 
work associated with the last item of work on 
Ascalmore-Tippo Project is substantially complete. 
Levee work associated with Item 1, Pelucia Creek is 
complete. Construction is continuing at Pelucia Creek, 
Item 1A. Construction of the next item of work at 
Pelucia Creek, Item 2, is scheduled for award in Sep. 
1988. 
(2) Channels. An award for construction of the 
Alligator-Catfish, Round Lake, Water Control Structure 
is scheduled for April 1988. Construction on the 
remaining channel work on the Ascalmore-Tippo Project 
is complete. 
Contract forces continued operation and maintenance 
of channels, levees and drainage facilities. 
(f) Enid Lake. (See Table 42-C.) The dam and 
appurtenant structures were maintained and operated. 
Rehabilitation of boat channels and snagging and 
clearing of tributary streams in the lake area continued. 
Maximum pool elevation in the lake was 247.48 
feet NGVD on July 2, 1987, when storage in the flood 
control pool was 231,400 acre-feet. Peak 24-hr. inflow 
was 13,100 cubic feet per second on Feb. 28, 1987. On 
Sep. 30, 1987, pool elevation was 243.5 feet NGVD and 
storage in the flood control pool was 178,500 acre-feet. 
(g) Grenada Lake. (See Table 42-C.) Construction 
of remaining public-use facilities has been deferred 
pending development of cost-sharing agreements with 
local interests for construction and non-Federal operation 
and maintenance, consistent with projects for 
which recreation facilities are being constructed 
under the provisions of the Federal Water Project 
Recreational Act of 1965 (Public Law 89-72), as 
amended. Maximum pool elevation in the lake was 
210.58 feet NGVD on Jun. 27, 1987, when storage in 
the flood control pool was 405,800 acre-feet. Peak 24- 
hour inflow was 35,600 cubic feet per second on Feb. 
28, 1987. On Sep. 30, 1987, the pool elevation was 206.8 
feet NGVD and storage in the flood control pool was 
305,400 acre-feet. 
Construction of a levee to provide protection to the 
community of Coffeeville from high Grenada Lake 
stages was begun in FY 82. In addition to the levee, 
other features of Coffeeville project include: three 
drainage structures through the levee; portable 
pumps; area rehabilitation; and raising of a town 
street. Construction of the levee and two of the drainage 
structures was completed in FY 82. The remaining 
feature of the Coffeeville project was completed 
in early FY 84. 
(h) Sardis Lake. (See Table 42-C.) The dam and 
appurtenant structures were maintained and operated. 
Clearing of tributary streams in the lake area 
continued. Maximum pool elevation in the lake was 
258.48 feet NGVD on Aug. 5, 1987, when storage in 
the flood control pool was 564,100 acre-feet. Peak 24- 
hour inflow was 29,000 cubic feet per second on Mar. 
1, 1987. On Sep. 30, 1987, the pool elevation was 249.9 
feet NGVD and storage in the flood control pool was 
334,000 acre-feet. An 8-mile reach of the Little Tallahatchie 
River from Sardis Dam to Highway 51 was 
clogged with sediment restricting releases from the 
lake. This reach has been dredged to restore the design 
capacity of the river. Six disposal sites were selected, 
located in upland hill areas to reduce the adverse 
impact on prime agricultural lands along the river and 
still be in compliance with environmental laws and 
regulations. Dredging was completed in August 1982. 
(i) Arkabutla Lake. (See Table 42-C.) The dam and 
appurtenant structures were maintained and operated. 
Clearing of tiributary streams in the lake area 
was continued. Maximum pool elevation in the lake 
was 220.25 feet NGVD on Aug. 25, 1987, and storage 
in flood control pool was 125,500 acre-feet. Peak 24- 
hour inflow was 27,000 cubic feet per second on Feb. 
28, 1987. On Sep. 30, 1987, the pool elevation was 217.3 
feet NGVD, and storage in the flood control pool was 
91,500 acre-feet. 
(j) Yazoo Basin backwater. The Yazoo Area backwater 
levees are complete, including the backwater 
42-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
levee from the Mississippi River levee to the west levee 
of the lower Auxiliary Channel, the Little Sunflower 
River drainage structure, and the connecting channel 
from the Steele Bayou drainage structure to the Big 
Sunflower River. A Phase I GDM was completed in 
FY 82 which addresses rural flooding from ponded 
runoff inside the backwater levee. A GDM for a pumping 
station of 17,500 cfs to reduce this ponding was 
approved Jul. 12, 1985. Later budgetary guidance 
reduced the pumping plant capacity to 10,000 CFS. 
A contract for portions of the inlet and outlet channel 
excavation for the pumping plant was awarded in 
March 1986. A construction schedule for the remaining 
project features is dependent upon the local sponsor 
meeting the cost sharing requirements specified 
in the Water Resources Development Act of 1986. 
The Satartia area backwater levee is complete. 
Rocky Bayou area levee Item lA was awarded in 
March 1985. Plans and specifications are being prepared 
for levee Item lB with award scheduled for 
March 1986. Completed backwater levees will require 
raising to provide the degree of protection intended 
based on the project design flow line developed for the 
Mississippi River following the 1973 flood. 
Four Greentree Reservoirs are now complete. Two 
of the three remaining reservoirs will be constructed 
when funds are appropriated. One reservoir has been 
indefinitely delayed because of right-of-way problems. 
The pumping station for Greentree 8 is complete. 
Pumping stations for Greentrees 1, 3 and 7 are under 
construction and will be completed in FY 88. 
(k) Upper Yazoo Projects. The first eight items of 
channel improvement, approximately 56 miles, and 
two drainage structures have been completed. This 
work extends from Yazoo City, MS, to about 15 miles 
upstream of Belzoni, MS. 
A contract for the next item of work, levee and 
channel Item 3A-1, is scheduled to be awarded in Dec. 
1987. Two drainage structures, East Hollie Lake 
Drainage Structure located about 18 miles north of 
Belzoni and Mosquito Lake Drainage Structure 
located about 11 miles south of Greenwood, are scheduled 
for award in Dec. 1987 and Aug. 1988, 
respectively. 
The Fort Pemberton Flood Control Structure is 
under construction and will be completed Late FY 89. 
Planning is continuing on upstream channel and levee 
work. 
(1) Streambank erosion control. Construction of 
the following projects has been completed: Tillatoba 
and Hunter Creeks, Items 1 and 2; Hunter Creek 1A; 
South Fork Tillatoba Creek, Items 5A and S5B; North 
Fork Tillatoba Creek, Items A and 3A; Batupan 
Bogue, Items 4A, 4A-1, and 4A-2; Perry Creek, Items 
6A and 6B; Johnson Creek, Items 9A, 9B, and vegetative 
treatment, Item 12; Goodwin Creek, Items 8A, 
8B, and 8C; and Hotopha Creek, Item 7. 
All construction under this feature is complete, and 
a final report was submitted to the Secretary of the 
Army Jan. 5, 1982. All work constructed has been 
turned over to the local sponsors for operation and 
maintenance except for the instrumented system on 
Goodwin Creek where the structures were retained for 
possible future studies. The Demonstration Erosion 
Control Project (DEC), a joint project with the USDA 
Soil Conservation Service was initiated by FY 85 
appropriations as a continuation on streambank erosion 
control efforts. The purpose of the project is to 
demonstrate the applicability of a systems approach 
to the design of erosion, sedimentation, and flood 
control works by applying this approach to six demonstration 
watersheds in the Yazoo Basin Hill area. 
Condition as of Sep. 30. The first feature of Yazoo 
Basin project was started in 1936, and the total project 
is about 35 percent complete. A total of 50.9 miles of 
backwater levee has been completed to the interim 
grade. The ongoing Yazoo Basin Comprehensive Study 
will address other water resources problems and needs 
in the area to include urban and rural flood damage 
prevention, hydropower, and water supply. During 
FY 87, work continued in the DEC toward development 
of the systems plans and implementation of a 
monitoring program. The district completed the construction 
of five grade control structures and 28,700 
linear feet of bank stabilization and initiated the construction 
of six grade control structures; 4.1 miles of 
clearing, snagging, and debris removal; and 32,500 
linear feet of bank stabilization. 
LOWER RED RIVER-SOUTH BANK 
RED RIVER LEVEES, LA 
Operations and results during fiscal year. New 
work by hired labor consisted of engineering studies. 
Maintenance by hired labor consisted of water control 
management and economic studies. 
Condition as of Sep. 30. Construction was initiated 
in FY29 and is 90 percent complete, based on the 
current estimated cost of $42,000,000. All of the 59.2 
miles of levees authorized, are complete to approved 
grade and section. (See Table 42-L for status of levees 
and Table 42-I for status of revetments. 
Memphis District 
ST. FRANCIS BASIN, AR AND MO 
Operations and results during fiscal year. 
(a) Little River Drainage. No work performed this 
fiscal year. 
(b) Upper St. Francis River. Stateline Ditch channel 
cleanout awarded May 17, 1985, completed Jul. 31, 
1987. Belle Fountain Ditch, alteration of Missouri 
State Highway NN bridge awarded Jul. 16, 1986, 1 
percent complete. State Line Ditch 29 alteration of 
Arkansas State HIighway 181 bridge awarded Jul. 12, 
42-8

MISSISSIPPI RIVER COMMISSION 
1985, 70% complete. Upper Buffalo Creek alteration 
of Missouri State Highway 164 and N awarded Jun. 
27, 1985, 60 percent complete. Upper Buffalo Creek 
channel enlargement awarded Sep. 23, 1986, completed 
Jul. 13, 1987. Alteration of Arkansas State 
Highway 119, Upper Buffalo Creek, awarded Aug. 29, 
1983, completed Apr. 30, 1987. Blackfish Bayou 
County bridge at Mile 26.59 awarded Mar. 11, 1987, 
85 percent complete. Channel excavation Big Creek, 
Item 2, Parcel 2, awarded Jul. 31, 1987, 18 percent 
complete. Madison to Marianna Floodway drift and 
sediment removal awarded Aug. 31, 1987, 0 percent 
complete. Bank repair, Ditch No. 81, Big Lake area 
awarded Jul 28, 1987, completed Sept. 28, 1987. 
Aggregate deliver to roadway, White River Levee and 
ramps awarded Jun. 10, 1987, 23 percent complete. 
Honey Cypress Creek county bridge at Mile 0.95 
awarded Feb. 13, 1987, completed Jul. 27, 1987. Honey 
Cypress Creek county bridge at Mile 4.55 awarded 
Mar. 12, 1987, completed Oct. 11, 1987. Alteration to 
Arkansas State Highways 77 and 119, Ditches 10 and 
12 awarded Mar. 2, 1987, 0 percent. Alteration of 
seven powerlines Ditches 10 and 12 awarded Feb. 24, 
1987, 0 percent. Oak Donnick Floodway alteraiton of 
railroad bridges awarded Jun. 5, 1987, 0 percent 
complete. Honey Cypress Creek county bridge at Mile 
5.18 awarded Mar. 9, 1987, completed Sep. 16, 1987. 
Alteration 3 x 6 gas pipeline Upper Buffalo Creek 
awarded Apr. 13, 1987, completed Aug. 20, 1987. 
Township bridge at Mile 35.80 Upper Buffalo Creek 
awarded May 29, 1987, 38 percent complete. 
(c) Lower St. Francis River. Upper Buffalo Creek 
Alterations of Highways 77 and 119 awarded Aug. 29, 
1983, completed Apr. 30, 1987. Huxtable Access Road 
awarded Sept. 17, 1985, completed Dec. 21, 1985. 
Helena Floodwall awarded Aug. 23, 1985, completed 
Dec. 9, 1985. Asphalt surfacing, W. G. Huxtable 
Pumping Plant, awarded Sep. 22, 1986, completed 
Jan. 12, 1987. Outlet channel scour repair, W. G. 
Huxtable Pumping Plant, awarded Oct. 11, 1985, 
completed Aug. 21, 1987. Big Lake Floodway, ditch 
bank repair, awarded Sep. 23, 1986, completed Jul. 
20, 1987. Bank repair, Ditch No. 81, Big Lake area, 
awarded Sep. 23, 1986, completed Aug. 21, 1987. 
Castor River bank repair, Missouri flood control, 
awarded Aug. 22, 1986, completed Sep. 26, 1986. 
Riprap stone protection at Arkansas State Highway 
139, Big Slough Drainage Ditch, awarded Jan. 22, 
1985, completed Apr. 14, 1986. Cleanout and embankment 
closure cross Ditch No. 2 awarded Jul. 21, 1987, 
completed Sep. 22, 1987. Balckfish Bayou, Item 3, 
countybridge at Mile 27.70 awarded Aug. 25, 1987, 
0 percent complete. Highway 79 to Huxtable landside 
ditch cleanout awarded Sep. 17, 1987, 0 percent complete. 
Channel cleanout, Parcel 1, Castor River, Item 
2 awarded Apr. 28, 1987, completed Oct. 17, 1987. 
Blackfish Bayou, Item 3, alteration of county roads 
awarded Jun. 17, 1987, 0 percent complete. W. G. 
Huxtable Pumping Plant cleaning and painting 
awarded Nov. 10, 1986, 42 percent complete. 
Condition as of Sep. 30. 
(a) Little River Drainage. Project was initiated 
during 1938 and is 86 percent complete. 
(b) Upper and Lower St. Francis River and Tributaries. 
Project was initiated during 1937 and is 80 
percent complete. 
WHITE RIVER BACKWATER LEVEES 
Operations and results during fiscal year. 
Graham Burke cleaning and painting awarded Sep. 
26, 1984, completed Mar. 28, 1986. Water service to 
Graham Burke Pumping Station, awarded Aug. 20, 
1986, 99 percent complete. 
LOWER WHITE RIVER 
Operations and results during fiscal year. 
(a) Augusta to Clarendon Levee. There were no 
contracts awarded or completed during the fiscal year. 
(b) Clarendon Levee. There were no contracts 
awarded or completed. 
Condition as of Sep. 30. 
(a) Augusta to Clarendon Levee. Project was 
initiated during 1946 and is 39 percent complete. 
(b) Clarendon Levee. Project was initiated during 
1972 and is 36 percent complete. 
CACHE BASIN, AR 
Operations and results during fiscal year. No 
contracts awarded or completed during the fiscal year. 
Condition as of Sep. 30. Project was initiated during 
1971 and is 4 percent complete. 
REELFOOT LAKE-LAKE NO. 9, TN AND KY 
Operations and results during fiscal year. No 
contracts awarded or completed during the fiscal year. 
Condition as of Sep. 30. Project was initiated during 
1974 and is 89 percent complete. 
WEST TENNESSEE TRIBUTARIES, TN 
Operations and results during fiscal year. 
(a) Obion River, TN. Below Bradford bridge 
awarded Jul. 1, 1986, completed Apr. 14, 1987. Obion 
Rivers channel improvement is 64 percent complete. 
(b) Forked Deer River, TN. Forked Deer River 
channel improvement is 13 percent complete. 
Condition as of Sep. 30. West Tennessee Tributaries 
Project is 41 percent complete. 
42-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
WEST KENTUCKY TRIBUTARIES, KY 
Operations and results during fiscal year. No 
contract awarded or completed during fiscal year. 
Condition as of Sep. 30. Project was initiated during 
1978 and is 4 percent complete. 
MISSISSIPPI RIVER LEVEES 
Operations and results during fiscal year. 
(a) L-10 AC Cairo awarded Sep. 27, 1985, completed 
Aug. 15, 1987. L-628 Rena Lara Coahoma awarded 
Sep. 30, 1985, 99 percent complete. Levee roadway 
resurfacing, Point Pleasure, MO, awarded Sep. 26, 
1986, completed Dec. 17, 1986. Levee roadway resurfacing, 
Concord, MO, awarded Sep. 22, 1986, completed 
Dec. 8, 1986. Levee roadway surfacing, 
Cottonwood Point, MO, awarded Sep. 23, 1986, completed 
Dec. 5, 1986. Floodwall alterations, Hickman 
Floodway, awarded Oct. 24, 1985, completed May 30, 
1987. Levee work, Item No. L-101, Parcel 2, above 
Cairo, awarded Sep. 27, 1985, completed May 30, 1987. 
Nash Relief Wells, Parcel I, Cape Girardeau, MO, 
awarded Mar. 30, 1984, completed Sep. 3, 1987. Levee 
work, Item R-678, Walnut Bend, AR, awarded Jul. 16, 
1986, completed Oct. 16, 1986. DeValls Bluff Pumping 
Plant repairs awarded Jul. 7, 1987, 4 percent complete. 
Channel improvement Lick Creek at Humboldt 
awarded Jun. 2, 1987, 31 percent complete. R-0-5 Ac. 
Parcel 2, Cairo-Mound City, Illinois, awarded Dec. 18, 
1987, 74 percent complete. Demolition of buildings, 
City of Hickman awarded Sep. 9, 1987, 0 percent 
complete. 
CONSTRUCTION GENERAL 
Ten ton bridge crane Ensley Engineer Yard 
awarded May 19, 1987, 10 percent complete. Fire 
alarm system Ensley Engineer Yard awarded Sep. 8, 
1987, 0 percent complete. 
42-10

TABLE 42-i 
Mileage 
Above Head 
of Passes 
0-9571 
10-81 
11-25 
38 
45 
118 
81 
44-91 
81-96 
91-104 
96-279 
104-234 
127-129 
235 
279-287 
287-303 
303-314 
314-572 
437 
437-721 
490 
537 
646 
605-666 
672-993 
722-725 
721-734 
MISSISSIPPI RIVER COMMISSION 
MISSISSIPPI RIVER IMPROVEMENTS 
Locality 
Head of Passes, LA-Cairo, IL 
The Jump-New Orleans, LA 
Baptiste Collette-Bayou Ostrica, 
LA 
Homeplace, LA 
Bohemia, LA 
Davis Pond, LA (formerly Myrtle 
Grove, LA) 
Caernarvon, LA 
Bohemia, LA-New Orleans, LA 
New Orleans, LA 
New Orleans, LA 
New Orleans-Morganza, LA 
New Orleans-Baton Rouge, LA 
Bonnet Carrey8 Floodway, LA 
Baton Rouge Harbor 
Morganza Floodway, LA 
Morganza-Old River, LA 
Old River, LA control 
Old River-Cypress Creek, AR 
Vicksburg Harbor, MS 
Vicksburg-Lake View, MS 
Wilson Point, LA 
Greenville Harbor, MS 
Long Lake, Helena, AR 
Henrico-Helena, AR 
St. Francis River-Commerce, 
MO3 
Industrial levee (Ensley Bottoms) 
Memphis Harbor, TN 
-" Remarks 
A 
Improvement 
Dredging, revetment, and contract 
work 
Main line levee, right bank 
Local levees, left bank 
Salinity control structure, right 
bank 
Salinity control structure, left 
bank 
Salinity control structure, right 
bank 
Salinity control structure, left 
bank 
Main line levee and floodwall, left 
bank 
Main line levee, right bank 
Main line levee and floodwall, left 
bank 
Main line levee, right bank 
Main line levee, left bank 
Regulating spillway, left bank 
Devils Swamp barge channel 
Regulating spillway, right bank 
Main line levee, right bank 
Levee closure and enlargement, 
low and high water spillway 
structures, navigation lock, and 
approach channels, right bank 
Main line levee, right bank 
Harbor extension and industrial 
fill 
Main line levee, left bank 
Pumping Plant and drainage 
structure, right bank 
Harbor improvements and port 
area 
Culvert and floodgate, right bank 
Main line levee and floodwall, 
right bank 
Main line levee, right bank 
Levee and pumping station 
Closure of Tennessee Chute, 
industrial fill, levee, harbor 
channels, etc. 
42-11 
Authorized by Public Law 
89-298 (HD 308/74/1). 
Included in MS Delta 
Region, LA feature. 
Authorized by Public Law 
89-298 (HD 308/74/1). 
Included in MS Delta 
Region, LA feature. 
Authorized by Public Law 
89-298 (HD 308/74/1). 
Included in MS Delta 
Region, LA feature. 
Postauthorization change 
report, approved June 
1987. 
Authorized by Public Law 
89-298 (HD 308/74/1). 
Included in MS Delta 
Region, LA feature. 
Authorized by Public Law 
81-516. 
Authorized by Public Law 
81-516. 
Modified by Public Law 87- 
874. 
Extends up south bank of 
Old River to Barbre 
Landing. 
Authorized by Public Law 
83-780. 
Joins Arkansas River, south 
bank levee. 
Authorized by Public Law 
70-391. Modified by Public 
Laws 79-526 and 83-780. 
Unpublished Vicksburg 
District's MRC report 
approved Apr. 14, 1966.2 
Authorized by Public Law 
85-500. 
Authorized by Public Law 
79-526.2 
Authorized by Public Law 
79-526.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 42-A MISSISSIPPI RIVER IMPROVEMENTS 
(Continued) 
Mileage 
Above Head 
of Passes Locality Improvement Remarks 
803-873 Tiptonville-Obion River Main line levee, left bank, levee Modified bv Acts of Jul. 24, 
857 Near Mud Lake, TN 
exte 
Riv( 
Pum] 
char 
890 St. Johns Bayou, MO Draii 
clos 
890 New Madrid Floodway, MO Draii 
clos 
890-954 New Madrid-Birds Point, MO Flooc 
902-922 Slough Bend, Hickman, KY Main 
922 Hickman, KY Flooc 
946 Peafield, MO Draii 
9571 Cairo, Cairo drainage district Flooc 
9571 Cairo, Cairo drainage district, Flooc 
Mounds, Mound City, and plar 
vicinity 
Thebes-Rock Island, IL LeveE 
Cape Girardeau, MO to Rock LeveE 
Island, IL 
1. Cairo, IL, is on Ohio River about 3 miles above its 
mouth (Mississippi River mile 954 AHP). 
2. Also see Table 42-D, "Authorizing Legislation." 
nsion, and diversion Obion 
er 
ping station and adjacent 
nnel improvements 
nage floodgate and levee 
ure 
nage floodgate and levee 
ure 
dway, right bank 
line levee, left bank 
dwall, left bank 
nage floodgate 
Iwalls and levees 
dwalls, levees, and pumping 
nt 
es, both banks 
es 
1946 and Dec. 23, 1971. 
Authorized Dec. 15 and 17, 
1970 under Sec. 201 of Oct. 
27, 1965 FC Act. 
Modified by Jul. 24, 1946 
Act. 
Modified by Sep. 3, 1954 
Act. 
Authorized by Sep. 3, 1954 
Act. 
Intermittent (Sec. 6). 
Intermittent (Sec. 6). 
3. Commerce, MO, is on Upper Mississippi River, 39 
miles above mouth of Ohio River. 
42-12

MISSISSISIPPI RIVER COMMISSION 
TABLE 42-B MISSISSIPPI RIVER TRIBUTARY AND 
OUTLET IMPROVEMENTS 
Mileage 
Below Head of 
Atchafalaya 
River Locality Improvement Remarks 
0-54 
27-54 
54-117 
20-27 
25-117 
27 
0-27 
31-57 
80 
53-11.7 
117 
117-129 
117-129 
105 
105-120 
115 
116 
5 
5-105 
29 
29 
40 
40 
40 
Floodway 
Floodway 
Floodway 
ATCHAFALAYA BASIN, LA1 
Atchafalaya Basin. Morganza 
and West Atchafalaya 
Floodways 
West Atchafalaya Floodway 
between Red River and 
Alabama Bayou 
Morganza Floodway between 
Mississippi River and Alabama 
Bayou 
Atchafalaya Basin Floodway 
between Alabama Bayou and 
Morgan City 
East protection levee (Morganza 
and Atchafalaya Flood ways) 
Lacour-Red Cross 
Morganza-Morgan City 
Bayou Latenache 
Upper Pointe Coupee Loop area 
Bayou Fordoche-Ramah 
Bayou Sorrel 
Bayou Sorrel Lock-Morgan City 
Morgan City 
Below Morgan City 
Below Morgan City 
Atchafalaya Basin Floodway 
lower protection levee 
Calumet 
Below Morgan City 
Berwick' 
Patterson 
West protection levee (Atchafalaya 
Basin and West Atchafalaya 
Floodways) 
Simmesport-Hamburg 
Mansura to Wax Lake Outlet 
Coulee des Grues 
West Atchafalaya Floodway 
Morganza Floodway 
Bayou Darbonne 
West Atchafalaya Floodway 
Morganza Floodway 
Including lower Morganza 
Floodway guide levee. 
Through upper Morganza 
guide levee and enlargement 
of outlet channel. 
Enlargement of Bayou 
Latenache. Approved Jun. 
4, 1970. See Table 42-D. 
Levee landside borrow pit. 
Alternate route, Gulf 
Intracoastal Waterway 
Port Allen to Morgan City. 
Gulf Intracoastal Waterway 
utilizes levee west side 
borrow pit channel. 
Gulf Intracoastal 
Waterway. 
Bypass route for Gulf 
Intracoastal Waterway. 
East of lower river. 
Bayou Teche-Wax Lake 
Outlet. 
Inclosed area between Wax 
Lake Outlet and Berwick. 
Lower Atchafalaya River. 
Adjustment to provide fresh 
water. 
West Atchafalaya 
Floodway. 
Through West Atchafalaya 
protection levee. 
42-13 
Levee, upper Morganza guide 
Levee and Morgan City floodwall 
Drainage structure, Pointe Coupee, 
and channel enlargement 
Additional drainage facilities 
Drainage channel 
Lock' 
Alternate navigation channel, Gulf 
Intracoastal Waterway 
Lock in Bayou Boeuf1 
Channel relocation 
Levee, floodwall 
Floodgate, east 
Levees, floodwall, drainage 
structures, and pumping plants 
Lock 
Water system 
Levee fuse plug 
Protection levee 
Levee enlargement and floodgate 
extension 
Railway 
Railway 
Gated drainage structures 
Highway 
Highway

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 42-B 
(Continued) 
MISSISSIPPI RIVER TRIBUTARY AND 
OUTLET IMPROVEMENTS 
Mileage 
Below Head of 
Atchafalaya 
River Locality Improvement Remarks 
41 
41 
'41 
94 
94 
105 
105 
0-54 
5-6 
5-66 
28-30 
40-41 
54-117 
94-106 
Mileage 
Above 
Mouth- 
0-8 
50-133 
96 
133 
0-17 
17-40 
40-51 
51-60 
17-42 
87-107 
40 
60 
Bayou Courtableau 
West Atchafalaya Floodway 
Morganza Floodway 
Charenton 
Jaws-Lake Fausse Pointe 
Calumet 
Wax Lake Outlet 
Atchafalaya River 
Barbre Landing-Alabama Bayou 
Simmesport 
Simmesport-Bayou Garofier 
Melville 
Krotz Springs 
Below Alabama Bayou 
Mississippi River-Morgan City 
TECHE-VERMILION BASINS, 
LA 
Atchafalaya River to Teche- 
Vermilion Basins 
SCourtableau Basin, LA, and 
outlets 
Charenton Canal 
West Atchafalaya protection levee 
borrow pit channel 
Bayou Courtableau spillway 
Bayou des Glaises 
BAYOU COCODRIE AND 
TRIBUTARIES 
Bayou Courtableau 
Bayou Cocodrie 
Bayous Cocodrie-Bouef diversion 
Bayou Boeuf 
Bayous Boeuf-Rapides diversion 
Upper Cocodrie 
Bayou Boez f 
Bayou Lamourie to Kincaid 
Structures 
Lecompte Control Structure 
Bayou Rapides Control Structure 
Gated drainage control structures 
and channels 
Railway 
Railway 
Floodgate and approach channels 
Outlet, Charenton drainage canal 
and protection levee. 
Floodgate, west 
Drainage canal-railway and 
highway bridges 
East bank, levee 
Levee, ring, and drainage structure 
West bank, levee 
Levee, ring 
Levee, ring 
Channel enlargement 
12- by 125-foot navigation channel 
Pumping station above Krotz 
Springs, conveyance channels, 
and appurtenant works 
Drainage channel 
Drainage channel 
Drainage control structure 
Diversion channel 
Enlargement and additional 
culverts 
Enlargement and realinement 
New channel 
New channel 
New channel 
Enlargement, clearing, and 
snagging 
Enlargement, realinement, 
clearing and snagging 
Fixed elevation weir 
Gated drainage structure 
42-14 
Borrow pit channel to 
Grand Lake through West 
Atchafalaya protection 
levee. 
Restoration of drainage 
west of West Atchafalaya 
Basin protection levee. 
Bayou Teche and Wax Lake 
Outlet. 
To lower flood heights. 
Increase channel capacities 
to decrease flood heights. 
Through Grand and Six 
Mile Lakes. 
Freshwater distribution 
from Atchafalaya River to 
Teche-Vermilion Basins. 
Outlet to gulf. 
Intercepting drainage 
channel. 
Washington to west 
protection levee.

MISSISSIPPI RIVER COMMISSION 
TABLE 42-B 
(Continued) 
MISSISSIPPI RIVER TRIBUTARY AND 
OUTLET IMPROVEMENTS 
Mileage 
Below Head of 
Atchafalaya 
River Locality Improvement Remarks 
Bayou Lamourie Control 
Structure 
Various 
LAKE PONTCHARTRAIN, LA 
Lake Pontchartrain, Jefferson 
Parish, LA 
AMITE RIVER, LA 
Amite River, LA 
LOWER RED RIVER, SOUTH 
BANK, RED RIVER LEVEES, 
LA 
Moncla-Hotwells 
Red River-Moncla to Lake Long 
EASTERN RAPIDES AND 
SOUTH-CENTRAL 
AVOYELLES PARISHES, LA 
Eastern Rapides and southcentral 
Avoyelles Parishes, LA 
TENSAS BASIN, AR AND LA 
Red River backwater area 
Tensas-Cocodrie area 
Larto Lake-Jonesville 
Sicily Island area 
Below Red River area 
Black River, LA 
Six Mile Bayou area 
Jonesville, LA 
Ouachita River 
Boeuf and Tensas Rivers and 
Bayou Macon, AR, and LA 
Boeuf River, AR, and LA 
Below Bayou La Fourche 
Bayou LaFourche 
Boeuf River, AR, and LA above 
Bayou LaFourche 
Canal 19 
Canal 19 extension 
Big and Colewa Creeks 
87 
(2, 3) 
Gated drainage structure 
Railway, highway, and local road 
bridges, and pipeline crossing 
Flood protection 
Bank protection 
Levee, south bank 
Levees 
Flood protection and drainage 
improvement 
Levees, drainage channels, 
structures, and pumping plant 
Levees, drainage channels, and 
structures 
Levees, drainage channels, 
structures, and pumping plants 
Levees, drainage channels, 
structures, and pumping plants 
Drainage structure and 
appurtenant channel works 
Levees, floodwall, pumping plant, 
and interior drainage 
Levees, drainage channels, and 
structures 
Clearing 
Channel improvement and 
realinement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvements 
42-15 
Authorized by Public Law 
81-516. Eliminated by 
Public Law 89-298. 
Intermittent (Sec. 6). 
Authorized by Public Law 
91-611. 
(4) 
(4) 
(4) 
(4) 
Unpublished VXD-MRC 
Letter Report dated May 
31, 1977. MR&T 
authority.2 
Portion of levee built under 
Sec. 6. Incorporated in 
MR&T by Public Law 
81-516.2 
Monroe to Sandy Bayou and 
Bawcomville (Sec. 6). 
(5) 
(5) 
Authorized by Public Laws 
78-534 and 79-526.2 3 
(5) 
(6) 
Authorized by Public Law 
78-534. 3 
82-145 
3-56 
3-56 
5 
56 
0-32 
0-56 
151-235 
210-286 
286-296 
0-75

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 42-B 
(Continued) 
MISSISSIPPI RIVER TRIBUTARY AND 
OUTLET IMPROVEMENTS 
Mileage 
Below Head of 
Atchafalaya 
River Locality Improvement Remarks 
Tributaries of Boeuf Ri'er- 
Canal 19 
Fleschmans Bayou 
Caney Bayou 
Big Bayou 
Canal 18 
Kirsch Lake Canal 
Black Pond Slough 
Bayou Macon, AR, and LA 
Bayou Macon 
Canal 43 
Canal 81 
Pumping plant and drainage 
structure 
Tributary of Bayou Macon 
Rush Bayou 
Tensas River, AR and LA 
Tensas River 
Tributary of Tensas River 
Mill and Vidal Bayous 
Grant's Canal, LA 
Grant's Canal at Lake Providence 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
To divert flows from Lake Chicot 
Clearing 
0-8 
0-7 
0-33 
0-10 
0-9 
0-14 
0-170 
0-34 
0-35 
Lake Chicot: 
0-6 
0-165 
0-22 
0-0.2 
(6) 
(6) 
(5) 
(6) 
(6) 
(6) 
See Table 42-E 
(5) 
(5) 
Authorized by Public Law 
90-483. 
(6) 
Authorized by Public Law 
78-534. 3 
Authorized by Public Law 
89-298. 
Authorized by Public Law 
81-516. 
LOWER ARKANSAS RIVER, 
AR 
Yancopin-Pine Bluff 
Fletcher Bend, AR to Pine Bluff 
North Little Rock to Gillett (below 
Plum Bayou) 
GRAND PRAIRIE-BAYOU 
METO, AR 
, Grand Prairie Region and Bayou 
Meto Basin, AR 
YAZOO BASIN, MS 
Yazoo Backwater area 
Yazoo River System below 
Arkabutla Lake 
. � Yazoo River between Yazoo City 
and Prichard 
i Yazoo River between Yazoo City 
and Askew 
Will M: Whittington Auxiliary 
Channel 
Yazoo City protection 
Rocky Bayou area 
Belzoni protection 
Greenwood protection 
Arkabutla Lake 
Levee, south bank 
Revetment 
Levee, north bank 
Water supply and drainage 
improvements 
Levees and pumping plants 
Channel improvement 
Levees, right bank 
'Levees, left bank 
(5) 
Authorized by Public Law 
81-516. 
Including Tallahatchie and 
Coldwater Rivers. 
Intermittent. 
Intermittent. 
Floodway channel 
Levee, drainage structure, and 
pumping plant 
Channel clearing and enlargement 
Levee and floodwall 
Levees, channel improvement, 
drainage structures, and pumping 
plants 
Flood detention and conservation 
Improvement of 7.8 miles 
was approved Apr. 29, 
1970. 
See Table 42-C. 
42-16 
Channel improvement 
Channel improvement 
Filling canal 
23-98_ 
35-98 
48-102 
0-75 
0-381 
75-366 
75-345 
45-109 
75 ' 
127 
185 
381

TABLE 42-B 
(Continued) 
MISSISSIPPI RIVER COMMISSION 
MISSISSIPPI RIVER TRIBUTARY AND 
OUTLET IMPROVEMENTS 
Mileage 
Below Head of 
Atchafalaya 
River 
0-64 
64 
0-24 
0-26 
26 
0-13 
13 
0-88 
137-260 
75-381 
0-8.3 
0-23 
0-42 
275-290 
0-204 
0-8 
0-28 
0-81 
0-43 
0-4 
0-27 
153-160 
0-68 
13-55 
0-68 
99 
Locality 
Yalobusha kiver below Grenada 
Lake 
Grenada Lake 
Tallahatchie River-Little 
Tallahatchie River 
Little Tallahatchie River below 
Sardis Lake 
Sardis Lake 
Yocona River below Enid Lake 
Enid Lake 
Cassidy Bayou below Old 
Coldwater River 
Upper Yazoo Projects 
Area between main stem and hills 
including Bobo Bayou 
McKinney Bayou 
Alligator-Catfish Bayous 
Bear Creek 
Whiteoak Bayou 
Tallahatchie River, MS 
Big Sunflower River, etc. 
Big Sunflower River 
Hull Brake-Mill Creek Canal 
Hushpuckena River 
Quiver River 
Gin and Muddy Bayous, MS 
Bogue Phalia 
Ditchlow Bayou 
Little Sunflower River 
Deer Creek 
Steele Bayou 
Muddy Bayou 
LOWER WHITE RIVER AND 
BASIN, AR 
Laconia Circle-Old Town Lake 
Big Creek and tributaries 
Clarendon levee 
42-17 
Improvement 
Channel improvement 
Flood detention and conservation 
Levees, Panola-Quitman Floodway 
Channel improvement 
Flood detention and conservation 
Channel improvement 
Flood detention and conservation 
Channel improvement 
Floodway channel 
Levees and channel improvement 
Channel improvement and 
enlargement of pumping plant 
Channel improvement 
Channel improvement 
Channel improvement 
Two road crossings of Panola- 
Quitman Floodway, MS and for 
protection of Sheley Bridge 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Water-control structure 
Levee, backwater including outlet 
Pumping plant 
Channel improvement and 
structures 
Levee and outlet structures 
Remarks 
See Table 42-C. 
See Table 42-C. 
See Table 42-C. 
Including Moores Bayou, 
Cutoff Bayou, Whiting 
Lake and outlet. 
Authorized by Public Law 
79-526. 
Authorized by Public Law 
79-526. 
Authorized by Public Law 
89-298. As modified in 
GDM in 1967. 
Authorized by Public Law 
89-298. 
Authorized by Public Law 
89-298. 
Authorized by Public Law 
90-147. 
Authorized by Public Law 
78-534.3 
Authorized by Public Law 
87-874. 
Authorized by Public Law 
78-534. 3 
Authorized by Public Law 
78-534. 3 
Authorized by Public Law 
78-534.3 
Authorized by Public Law 
78-534.3 
Authorized by Public Law 
78-534.3 Modified in 
December 1970. See Table 
42-D. 
Approved Mar. 3, 1970. See 
Table 42-D. 
Mile 605-645 Mississippi 
River. 
(6) 
Authorized by Public Law 
89-298. 
Authorized by Public Law 
89-298.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 42-B 
(Continued) 
MISSISSIPPI RIVER TRIBUTARY AND 
OUTLET IMPROVEMENTS 
Mileage 
Below Head of 
of Atchafalaya 
River Locality Improvement Remarks 
Augusta to Clarendon 
De Valls Bluff 
108-192 
122 
143 
0-196 
0-90 
260 
0-225 
225 
0-105 
86 
0-36' 
0-29 
0-17 
0-12 
0-108 
0-25 
0-20 
0-15 
(5) 
(5) 
Des Arc, AR 
CACHE BASIN, AR 
Cache River, AR 
Bayou DeView, AR 
ST. FRANCIS RIVER AND 
BASIN, AR, AND MO 
Inter-River Drainage District in 
Missouri 
Mouth of St. Francis River- 
Wappapello Dam 
Wappapello Lake 
Little River Basin 
Marked Tree, AR 
Tyronza River 
Big Slough Ditch 
Mayo Ditch 
Cross County Ditch 
Belle Fountain Ditch 
Drainage District No. 17 
L'ANGUILLE RIVER, AR 
L'Anguille River and tributaries, 
Brushy and First Creeks 
WEST TENNESSEE 
TRIBUTARIES 
Wolf River and tributaries, TN 
Obion River and tributaries, 
North, South, Middle, and 
Rutherford Forks 
Forked Deer River and 
tributaries, North, Middle, and 
South Forks 
Mud Lake Pumping Station, TN 
Harris Fork Creek, TN and KY 
Porter Gap, TN 
REELFOOT LAKE-LAKE NO. 
9, TN AND KY 
Running Reelfoot Bayou, TN 
Bayou du Chien and Lake No. 9, 
KY and TN 
42-18 
Levees, outlet structures 
Levee, outlet structure, and 
pumping station 
Levee, outlet structure, and 
pumping station 
Channel improvement and 
structures 
Channel improvement and 
structures 
Channel improvement and two 
outlet structures 
Floodway, levees, drainage 
channels, and structures 
Flood detention and conservation 
Floodway, levees, drainage 
channels, and structures 
Marked Tree Siphon 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement and 
pumping station 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Pumping plant 
Flood control improvements 
Construction to main-stem 
standards, levee and appurtanent 
structures for flood control 
Channel improvement 
Channel improvements and 
pumping station 
Authorized by Public Law 
81-516. 
Authorized by Public Law 
81-516. 
Authorized by Public Law 
81-516. 
Authorized Dec. 16, 1975. 
See Table 42-D. 
See Table 42-C. 
Authorized by Public Law 
90-483. 
Authorized by Public Law 
90-483. 
Authorized by Public Law 
80-858. 
(6) 
Authorized by 1948 Flood 
Control Act. 
Authorized by 1948 Flood 
Control Act. 
Authorized by Resolutions 
Dec. 15 and 17, 1970.2 
Authorized by Water 
Resources Act of Oct. 22, 
1976.2 Section 102, 1976.2 
Section 183, 1976.2 
Authorized by Public Law 
83-780. 
Authorized in December 
1970, See Table 42-D.

MISSISSIPPI RIVER COMMISSION 
TABLE 42-B 
(Continued) 
MISSISSIPPI RIVER TRIBUTARY AND 
OUTLET IMPROVEMENTS 
Mileage 
Below Head of 
Atchafalaya 
River Locality Improvement Remarks 
WEST KENTUCKY 
TRIBUTARIES, KY 
0-47 Obion Creek, KY Channel improvement Authorized by Public Law 
89-298. 
LITTLE RIVER DIVERSION 
CHANNEL, MO 
Delta to Ancell, MO Levees Mile 49 above Cairo. 
MISSOURI RIVER, MO 
0-28 Mouth to St. Charles, MO Levees Intermittent (Sec. 6). 
ILLINOIS RIVER, IL 
0-120 Mouth to Havana, IL Levees Intermittent (Sec. 6). 
OHIO RIVER, IL AND KY 
Cairo to Mound City and Mounds, Floodwall, levee, revetment, and 
IL pumping plant 
1. General data concerning Bayou Boeuf, Bayou Sorrel, 
and Berwick locks where Atchafalaya Basin protection levees 
cross Gulf Intracoastal Waterway, alternate route to Plaquemine, 
LA and lower Atchafalaya River (extension of Bayou 
Teche Waterway), respectively, are in report of New Orleans 
district. 
2. Also see Table 42-D, "Authorizing Legislation." 
3. Public Law 81-516 modified requirements of local 
cooperation. 
4. Authorized by Public Law 77-228. Modified by Public 
Law 89-298. 
5. Authorized or incorporated in MR&T by Public Law 
79-526.3 See Table 42-D. 
6. Authorized by Public Law 85-500. 
42-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 42-C MISSISSIPPI RIVER TRIBUTARY 
DAMS AND LAKES 
Grenada Enid Sardis Arkabutla Wappapello 
Name' Lake Lake Lake Lake Lake 
River Yalobusha Yocona Little Tallahatchie Coldwater St. Franbis 
Nearest town to damsite Grenada Enid Sardis Arkabutla Wappapello 
Drainage area, square miles 1,320 560 1,545 1,000 1,310 
Conservation pool: 
Area, thousand acres 10 6 11 5 4 
Volume, thousand acre-feet 86 58 108 31 31 
Elevation, 'feet, NGVD 193 230 236.0 209.3 354.7 
Flood control pool: 
Area, thousand acres 65 28 58.5 33 23 
Volume, thousand acre-feet 1,252 602 1,462 494 582 
Runoff, inches 17.8 20.2 17.7 9.3 8.4 
Outlet gates: 
Number 3 2 4 3 3 
Size, feet 7.5 by14 8 by 16 6 by 12 8.5 by 19 10 by 20 
Capacity, thousand cubic 
feet per second 10.7 9.4 10.0 10.0 18.0 
Spillway: 
Type, uncontrolled Chute Chute Chute Chute Gravity 
Length, feet 200 200 400 300 740 
Elevation, crest, feet, NGVD 231 268 281.4 238.3 394.7 
Discharge capacity, thousand 
cubic feet per second 52 50 132 89 229 
Surcharge pool: 
Area, thousand acres 106 41 90 63 32 
Volume, thousand acre-feet 1,385 554 1,447 858 521 
Runoff, inches 19.7 18.5 17.6 16.1 7.5 
Elevation, feet, NGVD 247.5 284.0 301.0 256.3 413.7 
Dam: 
Type, earthfill Rolled Rolled Hydraulic Rolled Rolled 
Length, thousand feet 13.9 8.4 15.3 11.5 2.7 
Elevation, crest, feet NGVD 256.0 293.0 311.4 264.3 419.7 
1. Grenada, Enid, Sardis and Arkabutla Lakes are in 
Yazoo River Basin, MS; Wappapello Lake is in St. Francis 
River Basin, MO. 
42-20

TABLE 42-D 
MISSISSIPPI RIVER COMMISSION 
AUTHORIZING LEGISLATION 
Actor 
Authorization Work Authorized Document 
May 15, 1928 
Jun. 19, 1930 
Feb. 15, 1933 
Apr. 23, 1934 
Aug. 30, 1935 
Jun. 15, 1936 
Aug. 28, 1937 
Jun. 28, 1938 
Aug. 18, 1941 
Dec. 22, 1944 
Jul. 24, 1946 
Flood protection in alluvial valley of Mississippi River, revetment 
and contraction works and dredging to provide least channel 
depth of 9 feet and width of 300 feet below Cairo. 
Provided for allotment of the balance of emergency rescue funds 
to reimburse levee districts and others for expenditures in floodcontrol 
works during the 1927 and subsequent floods. 
Provided for ownership of lands in Bonnet Carr6 Spillway and 
Floodway with proviso for granting rights-of-way, easements, 
and permits, in said lands 
Authorized payment for purchase of, or to reimburse states and 
local levee districts for the cost of, levee rights-of-way for flood 
control work in the Mississippi Valley, and for other purposes. 
Improvement of Wolf and Nonconnah Rivers, TN (Nonconnah 
Creek is correct title) 
Improvement of Wolf River (Memphis Harbor), TN 
Modification of the 1928 Act to provide for: 
Construction of a backwater levee at mouth of White River, AR 
Construction of Eudora floodway in lieu of Boeuf floodway; flood 
control, Yazoo River; construction of Morganza floodway; and 
an outlet to the Gulf of Mexico west of Berwick, LA, including a 
6-year program for the improvement and regularization of the 
Mississippi River between Arkansas and Red Rivers, and 
Atchafalaya River; and construction of roads on levees and 
drainage adjustments incident to floodway levees. 
Provided for construction of floodwalls, levees, and revetments 
along Wolf River and Nonconnah Creek for protection of 
Memphis, TN 
Modify the Yazoo River project to substitute a combined 
reservoir floodway and levee plan. 
Construction of Mounds to Mound City levee and control works 
along Cache River, IL 
Modification of previous act pertaining to floodways and outlets 
and lands therein; including program for the improvement and 
regularization of the Mississippi River, between Cairo and 
Arkansas River, extension of levee road system; strengthening 
of levees. 
Enlarge main line levees to offset abandonment of floodways 
between Arkansas and Red Rivers, flood control works in 
backwater areas of Yazoo and Red Rivers, and in Bayous 
Rapides, Boeuf, and Cocodrie, LA 
Navigation channel 12 feet deep and 300 feet wide between Baton 
Rouge and Cairo; flood protection of Yazoo River Backwater 
Area in vicinity of Satartia, MS 
Continue prosecution of channel improvement and stabilization 
program, $200 million. 
Flood control on the Big Sunflower, Little Sunflower, 
Hushpuckena, and Quiver Rivers and their tributaries, and on 
Hull Brake-Mill Creek Canal, Bogue Phalia, Ditchlow Bayou, 
Deer Creek, and Steele Bayou, MS' 
Improve Boeuf and Tensas Rivers and Bayou Macon, AR' 
Improve Bayou Lafourche, LA 
Improve Yazoo River tributaries. 
North bank, Arkansas River levees (below Plum Bayou).' 
42-21 
H. Doc. 90, 70th Cong., 1st 
sess. 
Public 395, 71st Cong., 2d 
sess. 
Public 351, 72d Cong. 
Public 171, 73d Cong. 
R&H Comm. Doc. 26, 72d 
Cong., 1st sess. 
R&H Comm. Doc. 45, 74th 
Cong., 1st sess. 
Unpublished report dated 
Apr. 2, 1925. 
H. Comm. on Flood Control, 
Doc. 1, 74th Cong., 1st sess. 
Unpublished report on 
record in OCE. 
H. Comm. on Flood Control, 
Doc. 1, 75th Cong., 1st sess. 
H. Comm. on Flood Control, 
Doc. 1, 75th Cong., 1st sess. 
H. Doc. 359, 77th Cong., 1st 
sess. 
H. Doc. 509, 78th Cong., 2d 
sess. 
Public Law 534, 78th Cong., 
2d sess. 
H. Doc. 516, 78th Cong., 2d 
sess. 
S. Doc. 151, 78th Cong., 2d 
sess. 
S. Doc. 191, 79th Cong.,2d 
sess. 
H. Doc. 516, 78th Cong., 2d 
sess. 
H. Doc. 308, 74th Cong., 1st 
sess.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 42-D 
(Continued) 
AUTHORIZING LEGISLATION 
Act or 
Authorization Work Authorized 
Levees on White River (Augusta to Clarendon).' 
Bayou des Glaises diversion channel, LA' 
Modify local cooperation requirements in St. Francis and Yazoo 
Basins. 
Tiptonville-Obion levee and drainage improvements.' 
Improvement of St. Johns Bayou, MO 
Big Sunflower River, etc.' 
Tennessee Chute (Memphis Harbor), TN 
Continue prosecution of project for flood control and channel 
improvement, $100 million. 
Improve Mississippi River below Cape Girardeau, MO with 
respect to West Tennessee tributaries. 
Improve L'Anguille River, AR 
Baton Rouge Harbor (Devils Swamp), LA' 
Flood protection at Des Arc, AR 
Improve St. Francis River and Basin, AR and MO 
Improve Cache River and Bayou DeView, AR and MO 
Improve Grand Prairie Region and Bayou Meto Basin, AR 
Flood protection, Lake Pontchartrain, Jefferson Parish, LA' 
Filling Grant's Canal, Lake Providence, LA 
Additional protection to Red River Backwater Area. 
Extend Federal jurisdiction to cover levees in Orleans Parish, LA 
Bank protection, Amite River, LA 
Continue prosecution of project for flood control and channel 
improvement, $200 million. 
Jonesville, LA levee, retaining wall, and drainage structure,' 
Modify requirements for local cooperation in White River 
Backwater Area, AR 
Navigation improvement of Atchafalaya from Mississippi River 
to Morgan City, LA 
Modify project for Vicksburg-Yazoo Area (Harbor), MS 
Improve New Madrid Floodway, MO, including Peafield 
drainage floodgate. 
Control of Old and Atchafalaya Rivers and a lock for navigation. 
Improve Reelfoot Lake area, KY and TN 
Improve Greenville Harbor, MS 
42-22 
Jun. 30, 1948 
May 17, 1950 
Oct. 30, 1951 
Sep. 3, 1954 
Jul. 3, 1958 
Document 
H. Doc. 98, 76th Cong., 1st 
sess. 
H. Doc. 602, 79th Cong., 2d 
sess. 
Public Law 526, 79th Cong., 
2d sess. 
H. Doc. 757, 79th Cong., 2d 
sess. 
H. Doc. 138, 80th Cong., 1st 
sess. 
H. Doc. 516, 78th Cong., 2d 
sess. 
S. Doc. 51, 80th Cong., 1st 
sess. 
Public Law 526, 79th Cong., 
2d sess. 
H. Doc. 627, 80th Cong., 2d 
sess. 
H. Doc. 651, 80th Cong., 2d 
sess. 
H. Doc. 321, 80th Cong., 1st 
sess. 
H. Doc. 485, 81st Cong., 2d 
sess. 
H. Doc. 132, 81st Cong., 1st 
sess. 
S. Doc. 88, 81st Cong., 1st 
sess. 
H. Doc. 255, 81st Cong., 1st 
sess. 
S. Doc. 139, 81st Cong., 2d 
sess. 
Public Law 516, 81st Cong., 
2d sess. 
Public Law 516, 81st Cong., 
2d sess. 
Public Law 516, 81st Cong., 
2d sess. 
Public Law 516, 81st Cong., 
2d sess. 
Public Law 516, 81st Cong., 
2d sess. 
S. Doc. 117, 81st Cong., 1st 
sess. 
Public Law 237, 82d Cong., 
1st sess. 
S. Doc. 53, 82d Cong., 1st 
sess. 
H. Doc. 85, 83d Cong., 1st 
sess. 
H. Doc. 183, 83d Cong., 1st 
sess. 
H. Doc. 478, 83d Cong., 2d 
sess. 
S. Doc. 160, 83d Cong., 2d 
sess. 
S. Doc. 15, 86th Cong., Ist 
sess.

TABLE 42-D 
(Continued) 
MISSISSIPPI RIVER COMMISSION 
AUTHORIZING LEGISLATION 
Act or 
Authorization Work Authorized Document 
Jul. 14, 1960 
Oct. 23, 1962 
Jun. 18, 1965 
Oct. 27. 1965 
Extensions to project for Boeuf and Tensas Rivers and Bayou 
Macon in Arkansas. 
White River backwater area pumping plant. 
Wolf River and tributaries for flood protection in Tennessee. 
Continue prosecution of project for channel improvement-$50 
million. 
Modification-Baton Rouge Harbor (Devils Swamp), LA 
Construct improvements in Gin and Muddy Bayous, Yazoo River 
Basin, MS 
Replace 2 bridges with adequate floodway over Boeuf River and 
Big Bayou in Boeuf Basin, AR 
Continue prosecution of project for flood control and channel 
improvement, $53 million. 
Modify and expand levees and channel improvement features of 
main stem project. 
Modify flood control improvements in following tributary areas 
and basins: Cairo-Mounds-Mounds City, St. Francis, Lower 
White, Boeuf-Tensas-Macon, Red River backwater, Yazoo 
headwater, Grand Prairie, and Bayou Meto. 
Acquire any modified easements required in New Madrid 
Floodway as provided by Sec. 4 of May 15, 1928 act. 
Operate and maintain pumping plant in Red River backwater 
area (Tensas-Cocodrie Pumping Plant). 
Provide improvements in West Kentucky tributaries. 
Provide fish and wildlife facilities in St. Francis and Big 
Sunflower Basins; Yazoo Headwater and Backwater Areas; and 
Mississippi Delta region. 
Deauthorize Amite River, LA project. 
Modify St. Francis River, MO and AR, project within District 
No. 7, Poinsett County, AR 
Provide pumping plant and drainage structure at Wilson Point, 
LA 
Construction of improvements to supplement freshwater supply 
in Teche-Vermilion Basins in Louisiana. 
Bank revetment for protection of existing industrial facilities 
along Mississippi River below Baton Rouge, LA 
Modification of West Tennessee tributaries feature to provide 
relocation of gas transmission lines at Federal expense. 
Continue emergency work, $87,135,000, which includes $.100,000 
for road crossing of Panola-Quitman Floodway, MS, and $80,000 
for protection of Sheley Bridge, Tallahatchie River, MS 
Improvements in Boeuf and Tensas Rivers and Bayou Macon 
Basin to divert flows that would otherwise enter Lake Chicot, 
AR 
Improvements in the Belle Fountain ditch and tributaries, MO, 
and Drainage District No. 17, AR 
Provide pumping plants and other drainage facilities in Cairo, 
IL, and vicinity. 
Modification of Yazoo Headwater Project to include cleanout 
along David Bayou, MS 
Modify Yazoo Backwater feature to include a control structure in 
Muddy Bayou, MS 
42-23 
H. Doc. 108, 85th Cong., 1st 
sess. 
S. Doc. 26, 85th Cong., 1st 
sess. 
H. Doc. 76, 85th Cong., 1st 
sess. 
Public Law 86-645. 
Public Law 87-874. 
Public Law 87-874. 
Public Law 87-874. 
Public Law 89-42. 
H. Doc. 308, 88th Cong., 2d 
sess. 
H. Doc. 308, 88th Cong., 2d 
sess. 
H. Doc. 308, 88th Cong., 2d 
sess. 
H. Doc. 308, 88th Cong., 2d 
sess. 
H. Doc. 308, 88th Cong., 2d 
sess. 
H. Doc. 308, 88th Cong., 2d 
sess. 
H. Doc. 308, 88th Cong., 2d 
sess. 
S. Doc. 57, 89th Cong., 1st 
sess. 
Unpublished Vicksburg 
District's MRC report 
Approved-Apr. 14, 1966. 
H. Doc. 524, 89th Cong., 2d 
sess. 
Public Law 89-789. 
Public Law 89-789. 
Public Law 90-147. 
H. Doc. 168, 90th Cong., 1st 
sess. 
H. Doc. 339, 90th Cong., 2d 
sess. 
Public Law 90-483. 
Unpublished MRC report 
dated May 8, 1968. 
Unpublished MRC report 
dated Feb. 2, 1970. 
Apr. 14, 19662 
Nov. 7, 1966 
Nov. 20, 1967 
Aug. 13, 1968 
Sep. 10, 19683 
Mar. 3, 19703

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 42-D 
(Continued) 
AUTHORIZING LEGISLATION 
Actor 
Authorization Work Authorized Document 
Apr. 29, 19703 
Jun. 4, 19703 
Dec. 31, 1970 
Senate and 
House Public 
Works 
Resolutions 
adopted Dec. 17 
and 15, 1970, 
respectively.4 
River Basin 
Monetary Act 
of Dec. 23,.1971 
Jan. 19, 19732 
TITLE I Water 
Resources 
Development 
Act of 1974. 
Modification of Yazoo Headwater Project to include drainage 
structure and channel improvement on Rocky Bayou, MS 
Provide for enlargement of Bayou Latenache from Pointe Coupee 
drainage structure to Alabama Bayou, LA 
Modify and expand project to include flood protection within the 
area of eastern Rapides and south-central Avoyelles Parishes, 
LA, that are drained by Bayou des Glaises diversion channel and 
Lake Long, and their tributaries. 
Modify the project for West Kentucky tributaries (Obion Creek), 
KY, to provide for all relocations, at Federal expense, of all 
transmission lines required by the project. 
Report on Western Tennessee Tributaries, TN and KY, 
authorized: 
a. Modification of Reelfoot Lake feature to provide channel 
improvements on Bayou du Chien and Lake No. 9 in KY and 
TN 
b. Modification of Mississippi levee feature to include a 
pumping station near Mud Lake floodgate and adjacent 
channel improvements. 
Modification of Big Sunflower Basin feature to provide 
additional improvements in Steele Bayou Basin, MS 
Continue prosecution of project for the comprehensive 
development of the basin, $97 million. 
Modification of Tiptonville-Obion River levee feature to relieve 
local interests of all responsibility except that of providing 
maintenance. 
Modification of the Mississippi levee feature to provide additional 
drainage facilities in Long Lake area, vicinity of Helena, AR 
Projects recommended by four completed reports were 
authorized for accomplishment of Phase I design memorandum 
of advance engineering and design on: 
a. Greenville Harbor, Greenville, MS 
b. East bank of Mississippi River, Warren to Wilkinson 
Counties, MS (Natchez area). 
c. East bank of Mississippi River, Warren to Wilkinson 
Counties, MS (Vicksburg-Yazoo area). 
d. Bushley Bayou Area of Red River Backwater Area, LA 
Modification of West Tennessee tributaries feature (Obion and 
Forked Deer Rivers), TN, to acquire lands for fish and wildlife, 
recreation, and environmental purposes. 
Modification of the Yazoo Basin, MS, feature to provide for a 
streambank erosion control demonstration project for the delta 
and hill areas of basin. 
Modification of project to provide that the Secretary of the Army, 
acting through the Chief of Engineers, can substitute authorized 
mitigation lands, not yet acquired and no longer suitable, for 
like acreage in the same or adjacent subbasins of the project 
area. This section provides the authority to substitute authorized 
mitigation lands in: 
a. Tensas Basin, LA and AR, feature (Red River backwater). 
b. St. Francis Basin, AR and MO, feature. 
Modification of Bayou Cocodrie and tributaries, LA, feature, to 
provide for: enlargement of Bayou Courtableau from 
Washington to west protection levee; right-of-way and spoil 
disposal areas at Federal expense; and necessary additional 
culverts through west protection levee. 
Unpublished MRC report 
dated Mar. 6, 1970. 
Unpublished MRC report 
dated Sep. 22, 1969. 
S. Doc. 91-113, 2d sess. 
Public Law 91-611. 
H. Doc. 91-414, 2d sess. 
S. Doc. 91-74, 2d sess. 
Sec. 1, Public Law 92-222. 
Sec. 7, Public Law 92-222. 
Unpublished Memphis 
District's MRC report 
dated Oct. 4, 1972. 
Sec. 1, Public Law 93-251. 
Mar. 7, 1974. 
S. Doc. 93-38, 1st sess. 
H. Doc. 93-148, 1st sess. 
H. Doc. 93-148, 1st sess. 
H. Doc. 93-157, 1st sess. 
Sec. 3, Public Law 93-251. 
Sec. 32, Public Law 93-251. 
Sec. 42, Public Law 93-251. 
Sec. 87, Public Law 93-251. 
42-24

TABLE 42-D 
(Continued) 
MISSISSIPPI RIVER COMMISSION 
AUTHORIZING LEGISLATION 
Actor 
Authorization Work Authorized Document 
TITLE II River 
Basin 
Monetary 
Authorization 
Act of 1974 
River Basin 
Monetary Act 
of Oct. 2, 1975 
Dec. 16, 19752 
TITLE II Public 
Works for 
Water and 
Power 
Development 
and Energy 
Research 
Appropriation 
Act 1976. 
TITLE II Public 
Works for 
Water and 
Power 
Development 
and Energy 
Research 
Appropriation 
Act, 1977. 
Water Resources 
Development 
Act of 1976. 
TITLE II Public 
Works for 
Waterand 
Power 
Development 
and Energy 
Research 
Appropriation 
Act, 1978. 
Modification of Cache River Basin, AR, feature to provide for: 
acquisition by fee easements of lands for fish and wildlife 
management, recreation, and environmental purposes. 
Continue prosecution of project for the comprehensive 
development of the basin, $211 million. 
Continue prosecution of project for the comprehensive 
development of the basin, $158,000,000. 
Modification of St. Francis Basin, AR and MO, feature to provide 
relief from ponding of interior runoff in the Inter-River 
Drainage District of Missouri. 
Continue prosecution of project for comprehensive development 
during period Jul. 1 - Sep. 30, 1976, $60,300,000. 
Continue prosecution of project for flood control, rescue work, 
repair, restoration, and control of bank erosion, $231,497,000. 
Sec. 101(a) authorized accomplishment of Phase I - Advanced 
Engineering and Design Memoranda - On: 
a. St. Johns Bayou and New Madrid Floodway, MO, project: 
Report of OCE - Sep. 26, 1975. 
b. Nonconnah Creek, TN and MS, project: Report of OCE - Jun. 
23, 1976, and as an independent part of the project: 
Improvements for flood control and allied purposes on Horn 
Lake Creek and tributaries, including Cowpen Creek, TN 
and MS. 
Modification of West Tennessee Tributaries feature (Obion and 
Forked Deer Rivers), TN, to: 
a. (Sec. 102) - Provide project for flood control for Harris Fork 
Creek, TN and KY: (H.D. 94-221) except that highway bridge 
relocations and alterations shall be at Federal expense. 
b. (Sec. 183) - Provide for construction of a levee and 
appurtenant works from mouth of Obion diversion channel to 
vicinity Highway 88 and thence to vicinity of Porter Gap, TN 
Continue prosecution of project for flood control, rescue work, 
repair, restoration, and control of bank erosion, $253,081,000. 
Sec. 99, Public Law 93-251. 
Sec. 201, Public Law 93-251. 
Mar. 7, 1974. 
Sec. 1, Public Law 94-101. 
Unpublished Memphis 
District's MRC report 
dated Nov. 11, 1975. 
Public Law 94-180, Dec. 26, 
1975. 
Public Law 94-355, Jul. 12, 
1976. 
Public Law 94-587, Oct. 22, 
1976. 
Public Law 95-96 Aug. 7, 
1977. 
42-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 42-D 
(Continued) 
AUTHORIZING LEGISLATION 
Act or 
Authorization Work Authorized Document 
Dec. 9, 1977, 5th 
Ind. on VXD 
May 31, 1977, 
Letter Report.2 
Jun. 28, 1980 
Energy and 
Water 
Development 
Appropriation 
Act, 1981 
Supplemental 
Appropria t ions 
Bill for FY 
Ending Sep. 
30, 1985 (PL 
99-88), and the 
Water 
Resources 
Development 
Act of 1986 (PL 
99-662) 
Water 
Resources 
Development 
Act, 1986 
Modification of the Tensas Basin Project, Red River Backwater 
Area, to include a drainage structure and appurtenant channel 
works in the Six Mile Bayou area of Concordia Parish, LA 
The establishment of the Tensas River National Wildlife Refuge 
for the preservation and development of environmental 
resources and in lieu of mitigation acquisitions which 
otherwise would be required for certain water resources 
projects, within designated limits, in the basins of the Tensas, 
Boeuf, and Red Rivers in the State of Louisiana. 
For expenses necessary for prosecuting work of flood control 
projects, rescue work, repair, restoration or maintenance of 
flood control projects threatened or destroyed by flood, 
$232,519,000: Provided, That not less than $250,000 be 
available for control of bank erosion of streams in the Yazoo 
Basin, including the foothill area. Provided further, That funds 
for the Tensas Basin Red River Backwater Area, be used for 
flood control, etc. for Sicily Island and Below Red River 
including pumping stations. 
Authorizes and directs the Secretary of the Army acting 
through the Chief of Engineers to proceed with planning, 
design, engineering and construction of 41 water resources 
projects, including Atchafalaya Basin Floodway System. For 
the Atchafalaya Basin Floodway Systems project, cost-sharing 
is only required for the recreation feature of the project. The 
flood control and environmental features are Federal costs. 
Sec. 104(a), Authorization of Projects - Authorization of 
Construction: 
Incorporation of the project for flood control, Louisiana State 
Penitentiary levee, Mississippi River, LA: Report of the Chief 
of Engineers, dated Dec. 10, 1982, at a total cost of $23,400,000, 
with an estimated first Federal cost of $17,600,000 and an 
estimated first non-Federal cost of $5,800,000. No acquisition 
of land for or actual construction of the project may commence 
until appropriate non-Federal interests shall agree to 
undertake measures to minimize the loss of fish and wildlife 
habitat lands in the project area. 
a. Bushley Bayou, LA. Water Resources Development Act of 
1986 authorized the project for flood control, Bushley 
Bayou, LA. 
b. Eight Mile Creek, Paragould, AR. Project entails channel 
improvement along the creek with miniparks and hiking/ 
biking trails. 
c. Helena and Vicinity, AR. The Helena Basin is an urban 
basin containing approximately 3,500 acres which 
frequently and severely floods the city of Helena. A 
pumping station and sump with channel enlargement and a 
gated culvert was recommended. 
d. West Memphis and Vicinity, AR. Channel improvements 
along Ten Mile Bayou and Fifteen Mile Bayou for a total of 
23.86 miles, with limited revegetation of right-of-way to 
maintain environmental stability. 
e. St. Johns Bayou and New Madrid Floodway, MO. Flood 
control for urban and rural land. 
f. Nonconnah Creek and Johns Creek, TN and MS. Channel 
enlargement, recreation features with channel construction 
and environmental enhancement. 
Unpublished Vicksburg 
District report dated May 
31, 1977, on Cynthia and 
Six Mile Bayous, LA 
Public Law 96-285, Jun. 28, 
1980. 
Public Law 96-367, Oct. 1, 
1980. 
FY 1985 Supplemental 
Appropriations Bill (PL 
99-88), and Water 
Resources Development 
Act of 1986 (PL 99-662). 
Public Law 99-662, Nov. 17, 
1986. 
42-26

MISSISSIPPI RIVER COMMISSION 
TABLE 42-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
g. Horn Lake Creek and Tributaries, TN and MS. This is an 
urban flood control project located in extreme northwest 
Mississippi and southwest Tennessee. The plan of 
improvement consists of 3.5 miles of selective drift removal 
on lower Horn Lake Creek and 2.6 miles of vegetative 
clearing on Horn Lake Creek, 2.1 miles on Rocky Creek and 
0.6 miles of vegetative clearing and 1.8 miles of channel 
enlargement on Cow Pen Creek. Hike/bike trails are 
included along Rocky Creek and Cow Pen Creek. 
Sec. 601(a) Authorization of Projects. Authorization of 
Construction: 
a. Yazoo Backwater Area, MS. Authorized the project for 
mitigation of fish and wildlife losses at the Yazoo 
Backwater Project, MS. The project shall include 
acquisition of 40,000 acres for mitigation of project-induced 
fish and wildlife losses. 
b. Greenville Harbor, MS. Authorized the project for 
navigation, Greenville Harbor, MS, as contained in the 
reports of Chief of Engineers, Nov. 15, 1977 and Feb. 2, 
1982, at a total cost of $43,700,000 with an estimated first 
Federal cost of $28,000,000 and an estimated non-Federal 
cost of $15,700,000. 
c. Vicksburg, Harbor, MS. Authorized the project for 
navigation, Vicksburg Harbor, as contained in the report of 
the Chief of Engineers, Aug. 13, 1979, at a total estimated 
first Federal cost of $55,900,000 and an estimated non- 
Federal first cost of $23,300,000. 
d. Helena Harbor, Phillips County, AR. The recommended 
plan consists of dredging a navigation channel to provide 
access to 685 acres of landfill; construction of an overlook 
park; implementing landscaping and erosion control 
measures; and mitigating fish and wildlife losses. The 
project is scheduled to be constructed in two phases. 
e. White River Navigation to Batesville, AR. The plan of 
improvement recommmended in the Feasibility Report 
provides for construction and maintenance to provide a 200- 
foot wide, 9-foot deep channel available 95 percent of the 
time from mile 10 (Arkansas Post Canal) to mile 254, two 
scenic overlooks, a primitive camping area, and acquisition 
of about 1865 acres of woodlands for mitigation. 
f. Obion Creek, KY. To prevent headwater flooding along 
tributary streams and backwater flooding of alluvial lands. 
g. Memphis Harbor, Memphis, TN. This is a navigation 
project in the vicinity of Memphis, TN, which would consist 
of dredging and maintaining a 4.9 mile long, 500-foot 
minimum width, 9-foot deep general navigation channel 
with additional dredging as required and strategic 
placement of dredged material to create and provide 
navigation access to 1,000 acres to be developed as a 
waterfront industrial complex. 
Sec. 806. Reelfoot Lake, KY. This project is modified to provide 
that the Federal share of the cost of operating the pumping 
plant feature of such project shall be 50 percent. 
Sec. 836. Mud Lake, Western Tennessee Tributaries. This 
project is modified to provide that the requirements of local 
cooperation shall be (1) 50 percent of the value of the lands, 
easements, and rights-of-way, (2) to hold and save the United 
States free from damages due to the construction works, and 
(3) to maintain and operate all the works after completion. 
42-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 42-D 
(Continued) 
AUTHORIZING LEGISLATION 
Act or 
Authorization Work Authorized Document 
Jun. 4, 1987 Modification of Mississipppi Delta Region project to construct Unpublished New Orleans 
salinity control structure at Davis Pond (mile 118) rather than District report, Nov. 1, 
at Myrtle Grove (mile 59). 1984. 
1. Incorporated into Mississippi River and tributaries 
project as shown in Table 42-E. 
2. Date minor modification for blocked drainage was 
approved under delegated authority of the President, Mississippi 
River Commission, and in accordance with Sec. 10(p) 
of the 1946 Flood Control Act (Public Law 79-526). 
3. Date minor modification was approved under discretionary 
authority of Chief of Engineers contained in May 
15, 1928, Flood Control Act, as amended. 
4. Projects approved under the provisions of Sec. 201 
of Flood Control Act of Oct. 27, 1965. 
42-28

MISSISSIPPI RIVER COMMISSION 
TABLE 42-E INCORPORATING AND AUTHORIZING LEGISLATION 
For Last 
Public Full Report 
Act of Law Authorizing See Annual 
Incorporation No. Act Description Report for 
Jul. 24, 1946 79-526 Jun. 22, 1936 Tiptonville-Obion levee and drainage 1941, p. 943 
improvements, TN 
Jul. 24, 1946 79-526 Jun. 22, 1936 Bayou des Glaises diversion ditch, LA 1946, p. 1029 
Jul. 24, 1946 79-256 Jun. 22, 1936 From North Little Rock, AR, to Gillett, AR, on 1946, p. 1053 
north bank of Arkansas River (portion below 
Plum Bayou). 
Jul. 24, 1946 79-256 Aug. 18, 1941 White River levees, Augusta to Clarendon and De 1946, p. 1083 
Valls Bluff, AR 
Jul. 24, 1946 79-526 Dec. 22, 1944 Boeuf and Tensas Rivers and Bayou Macon, LA 1945, p. 982 
Jul. 24, 1946 79-526 Dec. 22, 1944 Big Sunflower River, etc. 1946, p. 1061 
Jun. 30, 1948 80-858 Jul. 24, 1946 Devils Swamp barge channel at Baton Rouge, LA 1948, p.1059 
(Baton Rouge Harbor) 
May 17, 1950 81-516 Jun. 22, 1936 Jonesville, LA 1953, p.773 
May 17, 1950 81-516 Jul. 24, 1946 Lake Pontchartrain-Jefferson Parish, LA 1953, p. 737 
42-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 42-F SUMMARY OF PRESENTLY ESTIMATED 
FEDERAL FIRST COST OF AUTHORIZED IMPROVEMENTS 
Project Title 
Estimated Cost1 
Fiscal Year 1987 
Completed features2 
Mississippi River levees 
Mud Lake Pumping Station, TN 
Sec. 6 levees, 1928 Flood Control Act 
Channel improvement 
Atchafalaya Basin, LA 
Atchafalaya Basin Floodway System, LA 
Bayou Cocodrie and tributaries, LA 
Old River, LA 
Lower Red River-- South Bank Red River levees, LA 
Eastern Rapides and South-Central Avoyelles Parishes, LA 
Mississippi Delta Region, LA 
Tensas Basin, AR and LA 
Lower Arkansas River, AR 
Grand Prairie-Bayou Meto, AR (Flood Control & Water Supply) 
Yazoo Basin, MS 
Lower White River, AR (All except Big Creek & Tribs.) 
Lower White River (Big Creek & Tribs.) 
Cache Basin, AR 
St. Francis Basin, AR and MO 
Eight Mile Creek, AR 
L'Anguille Basin, AR 
West Tennessee Tributaries, TN 
Harris Fork Creek, TN & KY 
Reelfoot Lake-Lake No. 9, TN & KY 
Reelfoot Lake, TN & KY (Completed) 
Reelfoot Lake-Lake No. 9, TN & KY 
West Kentucky Tributaries, KY 
Tensas River National Wildlife Refuge 
Sardis Dam (Dam Safety Assurance) 
Bushely Bayou 
St. Johns Bayou and New Madrid Floodway 
Nonconnah Creek 
Horn Lake Creek and Tributaries 
Greenville Harbor 
Memphis Harbor 
Helena Harbor 
Helena AR and Vicinity 
West Memphis AR and Vicinity 
Vicksburg Harbor, MS 
Louisiana State Penitentiary Levee 
Teche Vermilion Basin 
TOTAL 
$ 199,238,000 
1,240,000,000 
4,950,0003 
4,000,0003 
3,075,000,000 
1,460,000,000 
139,000,000 
20,400,0003 
301,300,000 
25,900,0003 
50,000,000 
57,900,000 
452,000,000 
35,000,0003 
130,900,0003 
1,340,000,000 
16,802,0003 
39,000,0003 
168,000,000 
376,000,000 
19,900,000 
10,600,0003 
108,000,000 
13,800,0003 
(10,400,000)3 
440,000 
9,960,000 
25,400,0003 
40,000,0003 
7,400,000 
37,000,0004 
44,400,0004 
23,300,0004 
2,750,0004 
28,000,0004 
23,000,0004 
64,803,0004 
15,700,0004 
11,100,0004 
56,000,0004 
18,500,0004 
35,700,0004 
$ 9,429,843,000 
1. Inflation projected through the construction period. 
2. Includes Bonnet Carre', Morganza, and New Madrid 
Floodways; Memphis, Greenville, and Vicksburg Harbors; 
Lake Pontchartrain; Wolf River; completed roads on main 
stem levees; channel construction works; Atchafalaya River 
and Basin; Wax Lake Outlet; Charenton Canal; Bayou des 
Glaises diversion channel, Boeuf Basin levees; Grant's Canal; 
De Valls Bluff, Jonesville, and Des Arc protection works; 
Baton Roug3 Harbor; and miscellaneous features; Teche- 
Vermilion Basins, LA. 
3. Incremental (not projected through the construction 
period.) 
4. Authorized by Water Resources Development Act of 
1986, Public Law 99-662, Nov. 17, 1986. 
42-30

TABLE 42-G 
MISSISSIPPI RIVER COMMISSION 
MISSISSIPPI RIVER MAIN STEM 
CHANNEL IMPROVEMENTS
Operations in 1,000 Cubic Yards 
Location Fiscal Year 1987 
Mileage 
Above Head Channel 
District of Passes Construction Maintenance Total 
New Orleans 
Baton Rouge Harbor 
(Devils Swamp) 235 - 145.5 145.5 
Main stem channel 234-320 - 0.0 0.0 
Vicksburg 
Main stem channel 322-600 2,710.7 2,710.7 
Vicksburg Harbor 437 - 183.7 183.7 
Greenville Harbor 537 - 241.9 241.9 
Memphis 
Main stem channel 600-954 24,070.0 24,070.0 
Memphis Harbor, 
McKellar Lake 725 1,196.5 1,196.5 
TOTAL 28,548.3 28,548.3 
42-31

TABLE 42-Hi BANK REVETMENTS AND DIKES: NEW ORLEANS DISTRICT 
(FISCAL YEAR 1987) 
Operoantiosntrs uTtihnis FY Nonop- Oea- Constructierative tive 
Above New Work Reinforcement Since Thru 
Head Bank Exten- Prior This 
Location of B sion Lap Mainte- FY FY 
Passes or (Linear (Linear (Linear nance (Linear (Linear 
(Miles) L Feet) Feet) (Squares)1 Feet) (Squares) 1 (Squares)' Feet) Feet) 
MISSISSIPPI RIVER 
Standard revetment: 
Venice, LA .................. 12 
Lower Childress- 
Fort Jackson, LA ............. 22 
Buras, LA............... ... 25 
Tropical Bend, LA............ 30 
Bayou Lamoque, LA .......... 33 
Port Sulphur, LA ............ 39 
Point Michel, LA ............. 44 
Bohemia, LA ............... 46 
Diamond, LA................ 49 
Gravolet, LA............... 51 
Junior, LA ................... 54 
Harlem, LA .................. 56 
Myrtle Grove, LA ............ 59 
Monsecour, LA.............. 61 
Alliance, LA................. 62 
Belair, LA .................. 65 
Jesuit Bend, LA ............. 68 
Linwood, LA ................. 71 
Oak Point, LA ............... 72 
Scarsdale, LA ................ 75 
English Turn, LA ............. 78 
Poydras, LA ................. 82 
Cutoff, LA .................. 88 
Third district reach, LA ....... 93 
Algiers Point, LA ............ 95 
Gouldsboro Bend, LA ......... 96 
Gretna Bend, LA ............. 97 
Greenville Bend,LA .......... 100 
Carrollton Bend, LA .......... 104 
Avondale Bend, LA ........... 109 
Kenner, LA .................. 114 
Luling, LA.................119 
Good Hope, LA.............. 126 
Waterford, LA............. 128 
Montz, LA ................. 132 
Lucy, LA .................... 136 
Reserve, LA................. 138 
Willow Bend, LA .............. 141 
Angelina, LA................ 145 
Vacherie, LA................ 148 
Belmont, LA................ 152 
R
RRR 
L
R
R
L
R
L
R
L
R
L
RL
R
L
R
L
R
L
R
HL 
R
R
RR
LRL 
RLRL
RLRLRL 
2,850 
390 
2,277 
1,378 
8,047 
45 12,222 
60 2,401 
43 9,499 
60 5,245 
57 17,815 
2,400 
1,000 
9,216 
4,820 
19,798 
4,315 
5,529 
8,206 
16,210 
15,430 
17,283 LT 
25,012 
7,264 
36,995 
21,932 
1121,,368000 
17,435 
19,345 
15,148 
16,315 
10,020 0 
9,750 
22,841 
22,860 
10,638 
12,377 , 
13,852 
16,408 i 
45,864 
21,256 
27,167 
7,728 
4,960 
9,662 
22,045 
15,015 
28,074 
37,167 
28,908 
16,298 
12,295 " 
17,502 
17,826 
20,947 
7,618 
27,047 
13,295 
25,575 
Rich Bend, L ...A... ......... 157 
Romeville, LA.............. 161 
St. Alice, LA ................. 165 
Burnside, LA ................ 170 
Aben, LA .................... 172 
St. Elmo, LA .......... ..... 174 
Smoke Bend, LA .............. 177 
Marchand, LA.............. 180 
Philadelphia Point, LA ........ 183 
New River Bend, LA ......... 185 
White Castle, LA ............ 193 
St. Gabriel, LA................. 201 
Plaquemine Bend, LA ........ 209 
Manchac, LA................ 215 
Missouri Bend, LA ........... 222 
Arlington, LA................ 227 
Port Allen, LA.............. 231 
Allendale, LA................. 238 
Springfield Bend, LA ......... 244 
Arboth LA ................... 250 
Faulkner Lake, LA ........... 253 
Grand Bay, LA .............. 258 
Bayou Sara, LA .............. 265 
Red Store, LA................... 269 
Arrow Bend, LA ............. 272 
Boies Point, LA ............. 275 
Morganza, LA............... 279 
Iowa Point, LA .............. 282 
Brunette Point, :LA ........... 285 
Greenwood Bend, LA ......... 289 
Hog Point, LA ................ 296 
Carr Point, LA................ 304 
Above Old River, LA ......... 305 
Fort Adams, MS ................ 308 
Point Breeze, LA ............ 313 
Coochie, LA ................ 317 
Palmetto, MS................ 322 
Subtotal 
New Orleans District, 
Mississippi River....... 
Dikes: 
None 
RL 
R
L
RLRL 
R
LRL 
RL 
RL 
RRLRLRL 
RLRRL 
RL 
RRRLRRL 
5,755 
2,755 
1,740 
4,820 
2,400 
32,412 
(6.14 Miles) 
35 17,705 
65 21,521 
214 12,966 
160 26,770 
- 15,061 
739 141,205 
370 
2,066 
5,836 
(1.11 Miles) 
2,469 
17,477 
3,386 
3,991 
33,982 45,225 
33,163 
21,625 
27,052 
24,900. 
10,063 
1.0;240 
17,075 
10,144 
5,379 
33,414 
37,276 
26,809 
36,137 
35,480 
22,632 
12,244 
14,073 
25,502 
25,690 
13,190 
9,552 $ 
7,090 C 
16,958 
11,315 CI 
13,600 
16,094 C 
20,513 - 
11,375 
8,038 
14,987 
13,368 
8,600 r 
4,800 0 
17,219 
13,565 
17,150 
30,864 O 
- 1,434,520 
(271.69 Miles) 
OLD RIVER CONTROL 
Standard revetment: 
Inflow channel .............. 315 L - 
Inflow channel ............... 315 R - 
Outflow channel................ 315 L&R - 
Auxiliary inflow channel...... 312 L&R 17,200 
Auxiliary outflow channel 312 L&R - 
Total standard revetment, 
Old River ................ 17,200 
(3.26 Miles) 
2,415 
4,365 
19,891 
17,200 
5,790 
600 97,571 
600 97,571 - - - - 49,661 
(9.41 Miles) 
0
0

TABLE 42-H 
(Continued) 
BANK REVETMENTS AND DIKES: NEW ORLEANS DISTRICT 
(FISCAL YEAR 1987) 
OpeCraotnisotnrsu cTthioisn FY Nonaop- Opera- Constructionerative tive 
Above New Work Reinforcement Since Thru 
Head Bank Exten- Prior This 
Location of R sion Lap Mainte- FY FY 
Passes or (Linear (Linear (Linear nance (Linear (Linear 
(Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
ATCHAFALAYA RIVER 
Standard revetment: 
Mile One, LA ................. 
Coville, Bayou, LA.......... 
Legonier, LA ................. 
Simmesport, LA .............. 
Kuhlman Bayou, LA......... 
Odenburg, LA ................. 
Cason, LA .................... 
McCrea, LA .................. 
Woodside, LA ................ 
Provosty, LA ................. 
Crooked Bayou, LA......... 
Mercier, LA .................. 
Barberton, LA............. 
Evans Point, LA............ 
Goudeau, LA ................. 
Morris Bayou, LA.......... 
Goodwood, LA ................ 
Red Cross,:LA ................ 
Melville, LA .................. 
Cross Bayou, LA .............. 
Melville South, LA.......... 
Toles, LA .................... 
Petite Prairie, LA.......... 
Holloway Lake, LA.......... 
Bayou Sherman, LA......... 
Krotz Springs, LA ............. 
Sherburne, LA............. 
Bayou Big Graw, LA........ 
Morgan City ................... 
Total standard revetment ... 
Below Confluence 
of Red and 
Atchafalaya 
Rivers 
1. 
34 
6
7
9 
12 
13 
14 
17 
18 
22 
23 
24 
26 
27 
28 
29 
30 
31 
33 
35 
36 
37 
38 
40 
43 
46 
115 
L
R+ 
L
RL 
R
R
LRL 
RL 
RL 
RL 
RL 
RL 
RL 
R
LLR 
RRL 
- - - - - - 4,150 
- - - - - - - 6,550 
- - - - - - - 8,940 
- - - - - - - 10,636 
- - - - - - - 5,565 
- - - - - - - 5,375 
- - - - - - - 10,798 
- - - - - - 5,027 
- - - - - - - 13,002 
- - - - - - - 7,768 
- - - - - - - 9,600 
- - - - - - - 10,478 
- - - - - - - 3,592 
- - - - - - - 4,898 
- - - - - - - 3,618 
- - - - - - - 3,800 
- - - - - - - 8,505 
- - - - - - - 8,065 
- - - - - - - 4,870 
- - - - - - - 3,815 
- - - - - - - 4,070 
- - - - - - - 6,355 
- - - - - - - 8,381 
- - - - - - - 7,085 
- - - - - - - 5,200 
- - - - - - - 4,625 
- - - - - - - 7,035 
- - - - - - - 8,394 
- - - - - - - 3,410 
- - - - - - - 193,607 
- (36.67 Miles) 
Dikes: 
None
LOWER RED RIVER 
Below Confluence 
of Old River 
Outflow Channel 
and Red River 
Standard revetment: 
Long Lake, LA............. 
Naples, LA ............... 
Turnbull Island, LA....... 
Total standard revetment 
10
79 
R
RL 
- - - - - - - 6,652 
- - - - - - - 6,190 
- - - - 11,038 
- - - - - - - 23,880 
(4.52 Miles) 
Dikes: 
None 
1. Gross squares articulated concrete mattress (100 
square feet). 
12 
H
zv 
0
L
O
0
0
O
O
0 
C1,,

TABLE 42-I BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 1987) 
OpeCraotniosntrsu cTtihoisn FY Nonop- Opera- 
Constructionerative tive 
Above New Work Reinforcement Since Thru 
Head Bank Exten- Prior This 
Location of R sion Lap Mainte- FY FY 
Passes or (Linear (Linear (Linear nance (Linear (Linear 
(Miles) L Feet) Feet) (Squares)1 Feet) (Squares)1 (Squares) 1 Feet) Feet) 
MISSISSIPPI RIVER 
Standard revetment: 
Bougere Bend, LA.......... 
Dead Mans Bend, MS........ 
Glasscock Cutoff,, MS-LA ..... 
Railroad Landing, MS....... 
St. Catherine Bend, LA ....... 
Morville, LA .................. 
Natchez Island, MS......... 
Carthage, MS ................ 
Vidalia Casting Field........ 
Natchez Front, MS......... 
Gibson, LA .................. 
Ashland, LA-MS, TF........ 
Kempe Bend, LA........... 
Browns Field, LA.......... 
Goldbottom, MS............ 
Hardscrabble, LA ............. 
Grand Gulf, MS............ 
Point Pleasant, MS-LA ........ 
Togo Island, LA............ 
Lake Karnac, LA-MS ........ 
Diamond Point, LA-MS ....... 
Reid-Bedford, LA........... 
Racetrack, MS............ 
Barge Line Terminal, MS ..... 
Vicksburg Harbor, MS ....... 
Delta Point, LA ............... 
King's Point-Opposite 
Delta Point, LA-MS ......... 
False Point, LA............ 
Marshall-Brown's Point, 
LA-M S ...... :............. 
Milliken Bend, LA............. 
Belle Island, LA-MS........ 
Goodrich, LA ................ 
Cottonwood Bar, MS, TF ...... 
Fitler-Cottonwood, MS....... 
Hagaman, LA ................. 
Ben Lomond, MS.......... 
Baleshed Towhead-Stack 
Island, LA-MS........... 
Lake Providence, LA........ 
Mayersville, MS .............. 
Sarah Island-Opossum Point, 
LA-M S .................... 
CCraarocrlianfat,, 4AS .R................................ Worthington, MS-AR........ 
Walnut Point Kentucky 
Bend, MS ................... 
American Cutoff, MS-AR ..... 
Sunnyside-Lakeport, AR ...... 
Vancluse, AR ................ 
Island 84, AR, MS.......... 
Warfield Point, MS ........ 
Leland-LaGrange, AR-MS ..... 
Spanish Moss, AR.......... 
TarpleyIsland, MS......... 
Miller Bend, MS.:.......... 
Island 82, AR ................ 
Ashbrook Island, MS........ 
Arkansas City-Yellow 
Bend, AR ................... 
Huntington Point, MS....... 
Pair O'ice, AR ............... 
Eutaw-Mounds, MS.......... 
Cypress Bend, AR.......... 
Catfish Point, MS.......... 
Ozark, AR-MS. ............ 
Prentiss, AR-MS........... 
Rosedale Bend, AR......... 
Riverton, MS.............. 
Klondike, AR ................ 
Victoria-Bend-Terrene, MS .... 
Big Island, AR ............... 
Smith Point, MS........... 
Dennis, MS .................. 
Cessions, MS. ................. 
Total revetment, 
Vicksburg.District, 
Mississippi River........ 
Dikes: 
Jackson Point, MS ............ 
Opposite Warnicott Ldg, MS 
Natchez Island, LA-MS....... 
Waterproof Bar, LA ............ 
Spithead Towhead, MS....... 
Browns Field, LA.......... 
Cottage Bend, LA-MS....... 
Bondurant Towhead, LA ...... 
Coffee Point, LA........... 
Yucatan, MS ................. 
Togo Island, LA............ 
Below Racetrack, MS........ 
Racetrack Towhead, MS ..... 
False Point, LA............ 
Marshall Cutoff, LA......... 
Forest Home Towhead, LA .... 
Willow Cutoff, LA..........
329 
335 
342 
346 
350 
356 
357 
361 
363 
364 
371 
374 
383 
389 
392 
398 
403 
413 
415 
419 
423 
429 
433 
437 
437 
437 
439 
443 
446 
453 
460 
467 
470 
474 
481 
486 
488 
489 
497 
RL 
RL 
RRRLLL 
RL 
RRL 
RL 
RRL 
RRLLLR 
LR 
LRL 
RRL 
RL 
RRL 
503 
507 
511 
514 
519 
526 
530 
534 
535 
537 
538 
539 
542 
544 
546 
549 
553 
556 
561 
563 
568 
573 
578 
582 
585 
586 
588 
593 
598 
601 
611 
615 
RL 
RR 
LL 
RRLLL 
RRL 
RR 
RL 
RL 
RL 
RLLL 
RL RLL 
.L 
5,250 
2,240 
1,965 
3,040 
505 
5,250 
23,374 
11,488 
11,572 
12,506 
2,772 
9,424 
674 
495 
O
0 
26,055 v 
21,385 1,965 
11,595 
28,093 y 
14,855 . 
2,180 
14,700 0 
2,670 'T 
6,510 
24,230- 
27,092 
28,285 
9,280 
30,250 C 
22,530 z 
53,948 c 
32,345 
5,670 t 
19,260 . 
12,125 0 
18,392 
13,935 
3,040 
7,350 n 
7,650 
19,330 
12,860 
19,580 0 
44,650 
24,160 
37,220 m 
14,290 
28,427 
37,756 
10,235 
52,1242 
11,600 
34,992 
1,200 
12,683 
- - - 23,825 
--.-.-...- - -.-.- 2121,,201800 
-- - - - 8,350 
- - - 45,653 
- - - - 2,980 
"- - - - 33,685 
"- - - 4,300 
" - - - 13,475 
- - - - 4,320 
- - - - 14,150 
- - - - 4,580 
"- - - - 2,000 
"- - - - 29,360 
"- - - - 3,080 
- "- . - - 3,455 
__- - - 40,560 
- _-.__ - - - 10,045 
- _ - - - 9,095 
- -..-- 40,188 
- _ - - - 26,585 
"- - - 20,075 
- - -.- - - - 22,015 
"- - - 20,315 
- -"- - - 4,820 
- -".- - - 12,500 
" - "_- - - 23,400 
"- - - 29,245 
"- - 16,515 
- - - - 18,185 
- _ - 25,195 
" -- . - 10,910 
19,450 
(3.68 Miles) 
61,712 5,250 23,276 S 1,348,765 
(255.45 Miles) 
(3) 
330 
352 
358 
379 
386 
388 
389 
394 
405 
410 
416 
430 
431 
441 
448 
449 
462 
L
L
R
RLRL 
RRRLL 
RRRL 
R 
4,306 
5,351 
7,695 
11,372 
3,6614 
4,8354 
14,049 
4,421 
3,260 
9,010 
8,256 
11,7694 
1,752 
5,355 
5,1664 
4,5744 
4,2754 
5,355 
-.z

TABLE 42-I 
(Continued) 
BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 1987) 
OpeCraotniostnrsu cTthioisn FY Nonop- Opera- 
Constructionerative tive 
Above New Work Reinforcement Since Thru 
Head Bank Exten- Prior This 
Location of R sion Lap Mainte- FY FY 
Passes or (Linear (Linear (Linear nance (Linear (Linear 
(Miles) L Feet) Feet) (Squares)' Feet) (Squares)1 (Squares)' Feet) Feet) 
MISSISSIPPI RIVER 
continued 
Dikes: 
Arcadia Point, MS ............ 470 
Point Lookout, LA ............ 478 
Ajax Bar, MS ................. 482 
Ben Lomond, MS ............. 488 
Balshed Ldg., MS ............. 493 
Wilson Point, LA .............. 500 
Corregidor, MS ............... 505 
Carolina, AR ................. 509 
Cracraft Lower, AR .......... 510 
Cracraft, AR ................. 513 
Leota, MS .................... 514 
Island, 86, AR ................ 520 
Seven Oaks, AR .............. 523 
Walnut Point, MS ............ 525 
Refuge, MS .................. 528 
Island 84, AR ................ 532 
Leland Bar, AR-MS .......... 538 
Leland Neck, AR-MS ......... 540 
Tarpley Cutoff, MS-AR....... 540 
Island 82-Miller Bend, 
AsAhRbr-oMo kS- M....i.l.l..e..r. ..B...e..n..d , 544 
AR-MS .................... 547 
Ashbrook Cutoff, MS......... 549 
Chicot Ldg., AR.............564 
Catfish Point, MS'............571 
Below Prentiss, MS ........... 580 
Malone Field, AR ............ 585 
Terrene, MS .................. 590 
White River Landing, AR..... 591 
Montgomery Towhead, AR .... 592 
Victoria Bend, AR ............ 596 
Smith Point, MS............. 600 
Island 70, MS ................ 608 
Total dikes, 
Vicksburg District, 
Mississippi River........ 
L
RLLL 
RLL 
RRL 
RRLLL 
RL 
R 
R&L 
L&R 
L
RL 
RRL 
RRRLL 
0
0
'z7 
- - - - - - - 9,4634 n 
- - - - - - - 2,751 
- - - - - - - 24,319 y 
- - - - - - - 24,6674 
- - - - - - - 8,238 
- - - - - - - 3,592 p 
- - - - - - - 6,730 "J 
- - - - - - - 2,897 x 
- - - - - - - 9,614 
- - - - - - - 3,809 
- - - - - - - 7,571 
- - - - - 6,592 -.-.....- -5,754 p 
- - - - - - - 4,725 z 
- - - - - - - 5,278 � 
- - - - - - - 4,580 
- - - - - - - 16,878 
- - - - - - - 13,646 
- - - - 13,015 
- - - - - - - 8,728 
- - - - - - - 17,451 
- - - - - - - 5,290 
- - - - - - - 7,813 
- - - - - - - 7,59 I 
--.-..-..-.- - - - - - - 791 0 7,549 
-.-..-..-.- 7,921 0 
-- -- -- - - - - 2,201 i - - - - 6,071 
- - - - - - - 5,0334 
- - - - - - - 7,617 
- - - - - - - 14,949 -, 
4,930 
(0.93 Miles) 
Miles 
Above 
Mouth 
ARKANSAS RIVERS 
Standard Revetment: 
Menard Bend, AR............ 31 L 
Como, AR .................... 34 R 
Morgan Bend, AR............ 36 L 
Yancopin, AR.................24 R 
Total standard revetment, 
Arkansas River......... 
Dikes: 
388,482 
(73.58 Miles) 
11,770 
11,720 
5,250 
2,800 
31,540 
(5.97 Miles) 
RL 
R 
Hopedale Cutoff, AR.......... 30 
Morgan Bend, AR............ 36 
Fletcher Bend, AR.............39 
Total dikes, Arkansas River .... 
RED RIVER6 
Standard revetment:8 
Dupre, LA .................... 69 R 
Bringol, LA .................. 73 R 
EggBend, LA ................ 75 R 
Cologne Bend, LA............. 77 R 
Roxana, LA .................. 83 R 
Ryland, LA ................... 88 R 
Whittington, LA .............. 89 R 
Smith, LA................... 91 R 
Latanier, LA ................. 93 R 
Hudson, LA .................. 99 R 
Robert, LA .................... 102 R 
Alexandria Front, LA..........105 R 
Callahan, LA ................. 110 R 
Cotton, LA................... 116 R 
Rapides, LA ................. 119 R 
Boyce, LA ..................... 125 R 
Total standard revetment, 
Red River .................... 
Dikes7: 
Choctaw Bayou Bend, LA ...... 71 R 
Bringol (Egg Bend), LA ....... .73 R 
Egg Bend, LA................ 75 R 
Cologne Bend, LA............ 77 R 
EchoLA .. ................. 78 R 
Richardson, LA .............. 79 R 
- - - - - - 1,848 
- - - - - - 3,658 
- - - - - - - 2,187 c 
7,693 0 
(1.46 Miles) 
- - - - - 2,690 
.-. - - - 4,000 c 
- - - - - - 2,400 
.- - - - 650 
_ - - - - 2,900 
- - - - 2,700 0 
.-.. - - 2,460 Z 
- - - - - 1,458 
..-.... _- 5,500 
....... _ - 5,280 
.......- 4,000 
....... _-_- 14,700 
.......- 1,030 
....... _--4,548 
-. - - - 61,566 
(11.66 Miles) 
2,000 
2,477 
900 
1,850 
1,900 
2,700 
rP
t 
00
EP

TABLE 42-I 
(Continued) 
BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 1987) 
Operations This FY 
Construction Construcerative Nonop- Otpiveera- 
Above New Work Reinforcement Since Thru 
Head Bank Exten- Prior This 
Location of R sion Lap Mainte- FY FY 
Passes or (Linear (Linear (Linear nance (Linear (Linear 
(Miles) L Feet) Feet) (Squares)1 Feet) (Squares)1 (Squares)' Feet) Feet) 
RED RIVER7 
continued 
Dikes7: 
Alexandria, LA .............. 105 R - - - - - - (Rock groin) 270 
Bertrand, LA ............... 122 R - - - - - -7,630 
Total dikes, Red River ....... - - - - -19,727 (3.74 Miles) 
1. Gross squares articulated concrete mattress (100 
square feet). 
2. Contains 7,814 linear feet of trenchfill revetment 
(stone). 
3. Linear feet of dike on which repairs were made. 
4. Changed to correct previous errors. 
5. See report on Arkansas River and tributaries, AR 
and OK, under Little Rock District. 
6. Mileages based on 1967 hydrographic survey. 
7. Includes all types of dikes and retards. 
0
0
y
O~ 
0
0C O
Y
0
0
0

TABLE 42-J BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(FISCAL YEAR 1987) 
OpeCroantisotnrsu cTthioisn FY Nonop- Opera- 
Conserative tive 
Above New Work Reinforcement Since Thru 
Head Bank Exten- Prior This 
Location of R sion Lap Mainte- FY FY 
Passes or (Linear (Linear (Linear nance (Linear (Linear 
(Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
MISSISSIPPI RIVER 
Standard revetment: 
Big Island, AR .............. 
Scrubgrass Bend, AR ........ 
Henrico, AR ................. 
Cessions Towhead, AR ........ 
Knowlton, AR ............... 
Island 67, MS ................ 
Island 68 Bar, AR ............ 
Ludlow, AR ................. 
Rescue Landing, AR-MS ...... 
Fair Landing, AR ........... 
Burke Landing, MS .......... 
Island 62, AR ............... 
Island 63, MS ............... 
Island 63 Bar, MS ........... 
Oldtown Bend, AR ........... 
Horseshoe, MS .............. 
Westover, AR ............... 
Delta-Friars Point, MS ....... 
Helena, AR .................. 
Trotters Landing, MS ........ 
Flower Lake, MS ............. 
St. Francis, AR .............. 
Harbert Point, MS ............ 
Walnut Bend, AR ............ 
Mhoon Bend, MS ............ 
Peters, AR ................... 
Commerce, MS ............... 
Porter Lake, AR ............. 
Pickett, MS-AR .............. 
Norfolk-Star, MS ............. 
Cow Island Bend, AR ......... 
Cow Island Bend (Upper), 
TN ........................ 
Coahoma, TN ............... 
Ensley, TN ... ........... 
Dismal Point, AR ............ 
Bauxippi-Wyanoke, AR ....... 
Presidents Island, TN ........ 
Hopefield Point, AR, TN ....... 
Loosahatchie-Memphis, TN .... 
Loosahatchie Bar, TN ......... 
St. Clair, AR ................. 
Island 40, TN-AR ............. 
598 
600 
606 
615 
620 
621 
622 
626 
629 
632 
637 
638 
639 
639 
644 
647 
650 
655 
660 
665 
667 
672 
675 
680 
685 
692 
695 
700 
703 
709 
714 
716 
717 
723 
724 
730 
733 
736 
737 
740 
742 
744 
RRRL 
RL 
RRL 
RL 
RLL 
RL 
RL 
RLLRLRL 
R
L
RR 
L
R
RLL 
RRL 
RL 
RR 
R 
1,100 
3,190 
2,260 
4,970 
60 3,428 
2,933 
3,040 
9,251 
M,, 
C,, 
C
0M M 
3,905 
7,315 
25,040 
10,615 
16,900 
8,735 
6,445 
10,390 
27,020 
25,690 
19,070 
9,030 
11,454 
3,795 
26,860 
16,385 
12,730 
30,090 
36,460 
32,905 
16,385 
24,663 
9,065 
27,220 
35,828 
26,865 
23,575 
34,155 
12,575 
35,582 
22,274 
6,853 
9,270 
44,026 
7,200 
24,530 
12,755 
10,360 
31,293 
2,070 
2,9302 
30,750

TABLE 42-J 
(Continued) 
BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(FISCAL YEAR 1987) 
OpeCraotniostnrsu cTthioisn FY Nonop- Opera- Constructionerative tive 
Above New Work Reinforcement Since Thru 
Head Bank Exten- Prior This 
Location of R sion Lap Mainte- FY FY 
Passes or (Linear (Linear (Linear nance (Linear (Linear 
(Miles) L Feet) Feet) (Squares)1 Feet) (Squares) 1 (Squares) 1 Feet) Feet) 
MISSISSIPPI RIVER 
continued 
Standard Revetment: 
Brandywine, AR-TN........ 
Shelby Forest, TN.......... 
Dean Island, AR .............. 
Cedar Point-Densford, TN ..... 
Chute of Island 35, TN....... 
Lookout Bar, TN........... 
Lookout, TN ................. 
Sunrise Towhead, TN........ 
Lower Bullerton, AR........ 
Kate Aubrey Towhead- 
Island 30, TN .............. 
Osceola, AR .................. 
AOsshcepoolrat, -KAeRy e.s. .P..o.in..t,. T..N.. ........... 
Kate Aubrey, TN........... 
Island 26, TN ................ 
Bend of Island 25, TN........ 
Barfield, AR .................. 
Obion-Tamm, TN........... 
Huffman-Hickman, AR-TN .... 
Heloise, TN .................. 
Island 18, MO ................ 
Linwood Bend, TN.......... 
Blaker Towhead, TN........ 
Bells Point, MO .............. 
Gayoso-Caruthersville, MO .... 
Island 15, TN ................ 
Hathaway Landing, TN ....... 
Robinson Bayou, MO........... 
Fritz Landing, TN.......... 
Lee Towhead, MO.......... 
Bend of Island 14, TN........ 
Above Lee Towhead, TN ....... 
Little Cypress, MO.......... 
Merriwether-Cherokee, TN .... 
Linda, MO ................... 
Below Toney's Towhead, TN ... 
Toney's Towhead, KY-TN ..... 
New Madrid Bend, MO....... 
Kentucky Point, KY......... 
New Madrid Bar, KY........ 
750 
753 
756 
759 
764 
772 
774 
776 
782 
786 
786 
786 
791 
793 
798 
803 
808 
819 
826 
831 
836 
841 
845 
845 
848 
851 
852 
852 
857 
859 
859 
861 
864 
869 
876 
879 
882 
886 
887 
888 
RL 
RL 
RRRRR 
RRRL 
RRL 
RL 
RL 
RLL 
RRLLRLLLL 
RL 
RLL 
RL 
R 
2,770 70 5,341 
New Madrid, MO........... 
La Forge, MO ................ 
SlTouNg-hK LYa n.d..in.g.. N..e.c.k.,......... 
Winchester Towhead, MO ..... 
Island 9, KY-TN .............. 
Milton Bell, MO............ 
Chute of Island 8, KY........ 
Bend of Island 8, MO........ 
Island 8, KY ................. 
Hickman-Reelfoot, KY....... 
Beckwith Bend, MO......... 
Williams, KY ................ 
Wolf Island, KY............ 
Columbus, KY............. 
Belmont, MO ................. 
Island 3 and 4, KY.......... 
Campbell, KY ................ 
Pritchard, MO............. 
Mayfield Creek, KY......... 
Wickliffe, KY ................ 
Cache-Cairo, IL (Ohio River),... 
Total revetment, 
Memphis District 
Mississippi River........ 
Dikes: 
Henrico, AR ................. 
Below Knowlton, AR........ 
Island 67, MS ................ 
Below Ludlow, AR.......... 
Sunflower, AR................ 
Island 64, AR ................ 
Island 62, AR.............. 
Island 63 Bar, MS.......... 
Island 63, MS ................ 
Kangaroo Point, AR......... 
Friars Point, MS........... 
Montezuma Bar, MS........ 
Montezuma Towhead, AR ..... 
Prairie Point, AR........... 
Flower Lake, MS........... 
St. Francis Towhead, MS ...... 
Below Walnut Bend, AR ....... 
Bordeaux Point, MS......... 
Peters, AR ................... 
Commerce, MS ............... 
Basket Bar, AR .............. 
Buck Island, MS .............. 
Porter Lake, AR .............. 
Pickett, M S .................. 
Seyppel, AR .................. 
Cat Island, AR............. 
Coahoma, TN ................ 
Armstrong, AR-TN......... 
1C+ o 
889 
892 
899 
900 
905 
908 
913 
914 
914 
919 
924 
927 
934 
937 
938 
940 
943 
948 
949 
953 
958 
R
R
L
R
L
R
L
RRL 
RL 
RL 
R
RL 
RL 
L
R 
1,700 
16,000 
(3.03 Miles) 
350 3,047 1,476 
(7) 
1,159 
1,673 
3,082 
2,105 
520 21,067 47,435 
(5) 
603 
616 
621 
624 
627 
630 
638 
639 
640 
649 
652 
657 
656 
668 
668 
671 
676 
681 
693 
694 
696 
700 
701 
704 
706 
710 
718 
720 
R
RL 
RL 
RRL 
L
RLL 
RR 
LL 
RL 
RL 
RL 
RL 
RR 
L
R 
4,6 
1,600 
6,790 
1,280 
00 - 
(7) - 
(7) - 
g00 - 
300 - 
300 - 
5,559 
22,380 
37,5207 
5,540 
33,5854 
14,375 
12,620 
9,800 
13,175 
43,359 
14,588 
10,015 
19,205 
3,825 
5,785 
19,970 
6,865 
15,045 
8,935 
8,455 
26,152 
1,854,455 
(351.22 Miles) 
(6) 
6,310 
10,233 
4,320 
5,040 
5,520 
7,330 
23,180 
2,600 
5,640 
5,730 
6,870 
12,430 
3,450 
10,391 
11,060 
3,380 
6,420 
4,920 
7,830 
7,300 
5,060 
4,705 
17,480 
7,180 
12,250 
15,590 
4,640 
18,690 
0
! 
0
0 
1,738 
7,174 
13,857 
9,198 
18,010 
9,550 
7,555 
20,190 
29,190 
2,9902 
5,005 
14,615 
28,350 
30,808 
1,3503 
5,823 
44,232 
2,500 
15,690 
30;630 
46,070 
51,321 
26,984 
12,935 
22,170 
14,850 
17,087 
5,420 
25,600 
3,630 
1,000 
22,630 
15,670 
8,470 
12,050 
4,943 
34,090 
41,058 
11,950 
20,895 
6,200 
30,348 
7,960 
16,825 
Ct2 
Ct2 
C12 
z 
- 
c 
L 
C 
r

TABLE 42-J 
(Continued) 
BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(FISCAL YEAR 1987) 
OpeCr oatnisotnrus cTtihoins FY Nonop- Opera- Constructionerative tive 
Above New Work Reinforcement Since Thru 
Head Bank Exten- Prior This 
Location of R sion Lap Mainte- FY FY 
Passes or (Linear (Linear (Linear nance (Linear (Linear 
(Miles) L Feet) Feet) (Squares)1 Feet) (Squares) 1 (Squares)1 Feet) Feet) 
MISSISSIPPI RIVER 
continued 
Dikes: 
Dismal Point, AR........... 
Hopefield Point, AR......... 
Robinson Crusoe, TN........ 
Loosahatchie Bar, TN........ 
Above Loosahatchie, TN ....... 
Redman Point, AR.......... 
Randolph Point, TN......... 
Poker Point, AR............ 
Corona Bar, TN-AR......... 
Densford, TN ................ 
Cedar Point, TN............ 
Below Richardson Landing, 
T N ........................ 
Lookout, TN-AR .............. 
Plum Point, TN .............. 
Lake Neark, AR .............. 
Kate Aubrey, TN ............. 
Keyes Point, TN............ 
Ashport-Goldust, TN-AR ...... 
Forked Deer, TN........... 
Island 25, AR ................ 
Nebraska Point, TN......... 
Below Tamm Bend, TN ....... 
Wrights Point, AR.......... 
Island 21, Chute, TN......... 
Head of Island 21, TN........ 
Island 20, MO-TN.......... 
Island 18, TN.............. 
Tennemo,.TN ................ 
Blaker Towhead, TN........ 
Caruthersville-Linwood 
Bend, M O.................... 
Sandy Hook, TN .............. 
Island 15, TN ................. 
Robinson Bayou, MO........ 
Hathaway, TN............. 
Island 15 Neck, TN......... 
Above Lee Towhead, TN ....... 
Below Cherokee, TN......... 
Stewart Towhead, MO....... 
Ruddles Point, MO.......... 
724 
736 
738 
739 
742 
743 
747 
748 
755 
757 
759 
767 
771 
784 
786 
791 
791 
795 
798 
804 
808 
813 
820 
824 
828 
831 
837 
842 
843 
844 
850 
851 
853 
854 
854 
859 
866 
871 
874 
RRRRL 
RL 
RRLL 
L
RL 
RRL 
RL 
RLL 
RLL 
RL 
LL 
RRLRLLLL 
RR 
490 
500 
1,100 
1,350 
715 
1,760 
1,500 
1,225 
1,150 
600 
41,,090000 
200 
800 
1,200 
1,400 
25,510 
1,330 
21,9391 
3,950 
8,990 
7,750 
16,740 
8,050 
8,430 
7,780 
2,890 
5,950 
5,538 
9,695 
2,5459 
11,270 
19,775 
17,330 
8,550 
5,450 
12,149 
8,300 
32,635 
3,170 
5,460 
18,139 
8,670 
4,390 
4,070 
25,877 
2,350 
7,510 
9,890 
26,750 
21,100 
1,300 
6,230 
18,290 
8,130 
i Island11, MO . ............ 
Kentucky Point, KY......... 
Morrison Towhead, MO....... 
Hotchkiss Bend, MO........ 
Below Island 9, TN......... 
Donaldson Point, MO........ 
Island 9, KY ................. 
Moore Island, KY-MO....... 
Above Williams, KY........ 
Campbell, KY ................ 
Pritchard, MO............. 
Island 1, KY ................. 
Total dikes 
Memphis District, 
Mississippi River........ 
882 
887 
890 
895 
901 
905 
906 
929 
930 
942 
944 
948 
RL 
RRL 
RLRLLRL 
1,600 
(0.3 Miles) 
8,070 
600 
600 
700 
150 
4,039 
11,550 
1,070 
6,583 
18,859 
8,320 
7,0106 
4,685 
1,1508 
2,610 
9,390 
15,260 
27,440 749,947 
(142.04 Miles) 
1. Gross squares articulated concrete mattress (100 
square feet). 
2. Lumber mattress revetment. 
3. Rock Groins. 
4. Stone in pile dike. 
5. Linear feet of dike on which repairs were made. 
6. Linear feet of triangular frame retards and pile 
dikes. 
7. Changed to correct previous errors. 
0
0
pC 
tTj 
0
OE 
0
�x 
0
OI 
Y
m~ 
aI 
C,, 
0
C0 
z

TABLE 42-K PROJECT LEVEES: NEW ORLEANS DISTRICT 
(FISCAL YEAR 1987) 
Levees and Floodwalls Berms (Miles) Surfaced Roads on Levees 
(Miles) (Miles) 
Built to Approved Total 
Location Total Grade and Section In In Com- 
Authorized PlIanc e Total System Com- ystem pte Thru When Built plete When Built 
for This This This Comrn- This This Comr- This This 
System FY FY FY pleted1 FY FY pleted FY FY 
MAIN STEM LEVEES 
Mississippi River Levees 
Fifth Louisiana Levee District........ (16.8) (16.8) 
Levees ............................ 15.5 15.5 
Old River structures and levees ..... 1.3 1.3 
Atchafalaya Basin Levee District ..... (126.3) (126.3) 
Levees ............................ 118.7 118.7 
Morganza structure and levee ...... 0.8 0.8 
Morganza forebay levee............ 6.7 6.7 
Port Allen lock .................... 0.1 0.1 
Lafourche Basin Levee District Levees 61.7 61.7 
Plaquemines West Levee District Levees 37.9 37.9 
Buras Levee District ................ (34.1) (34.1) 
Levees ............................ 34.0 34.0 
Empire lock ...................... 0.1 0.1 
Baton Rouge front levees............. (2.1) (2.1) 
Pontchartrain Levee District ......... (124.9) (124.9) 
Levees ............................ 110.8 110.8 
Bonnet Carrc guide levees. ......... 11.3 11.3 
Bonnet Carre forebay levee......... 1.3 1.3 
Bonnet Carre structure............ 1.5 1.5 
East Jefferson Levee District Levees . 11.6 11.6 
West Jefferson Levee District......... (20.0) (20.0) 
Levees ............................ 19.8 19.8 
Floodwalls ........................ 0.1 0.1 
Harvey Canal Lock................. 0.1 0.1 
Orleans Levee District ............... (27.2) (27.2) 
Left descending, east bank........... (13.3) (13.3) 
Levees............................. 4.6 4.6 
Floodwalls ......................... 8.6 8.6 
IHNC lock......................... 0.1 0.1 
Right descending, west bank......... (13.9) (13.9) 
Levees .............................. 13.8 13.8 
Algiers Canal lock................. 0.1 0.1 
Lake Borgne Basin Levee District Levees 11.6 11.6 
Grand Prairie Levee District Levees .. 37.4 37.4 
Total Mississippi River.......... 511.6 511.6 
(-) (10.7) 
1.1 9.4 
- 1.3 
(-) (85.4) 
- 77.8 
- 0.8 
- 6.7 
- 0.1 
- 24.1 
- 28.5 
(-) (19.7) 
- 19.7 
(-) (0.9) 
(-) (91.1) 
- 77.0 
- 11.3 
- 1.3 
- 1.5 
- 10.8 
(-) (4.6) 
- 4.4 
- 0.1 
- 0.1 
(-) (19.5) 
(-) (7.5) 
- 0.6 
- 6.8 
- 0.1 
(-) (12.0) 
- 11.9 
- 0.1 
- 11.5 
- 19.7 
- 326.5 
(-) 
(5.3) 
5.3 
0.1
(-) 
(-) 
(4.7) 
4.7 
(-) 
(-) 
(-) 
(-) 
10.1 
(-) 
(-) 
(-) 
(-) 
(-) 
(-) 
(-) 
(-) 
(-) 
(1.1) (.15.5) 
- 15.5 
(-) (118.7) 
- 118.7 
0.1 61.7 
- 37.9 
(-) (34.0) 
- 34.0 
(-) (2.1) 
(-) (110.8) 
- 110.8 
- 11.6 
(-) (19.9) 
- 19.8 
- 0.1 
(-) (18.4) 
(-) (4.6) 
- 4.6 
(-) (13.8) 
- 13.8 
- 11.6 
- 37.4 
1.2 479.6 
Other Levees Included in Mainstem 
Atchafalaya Basin 
Atchafalaya River and 
Bayou des Glaises .................. (148.4) (148.4) 
East bank Atchafalaya River....... 52.5 52.5 
Bayou des Glaises.................. 7.9 7.9 
West bank Atchafalaya River ....... 60.1 60.1 
Simmesport Ring................. 1.6 1.6 
Melville Ring ..................... 4.1 4.1 
Krotz Springs Ring................. 1.7 1.7 
Mansura Hills to Hamburg.......... 20.5 20.5 
West protection levee, Hamburg to Berwick 
drainage canal via Calumet...... (128.7) (128.7) 
Levees west of Berwick, Berwick drainage 
canal to Charenton drainage canal (56.5) (56.5) 
Morganza upper guide levee .......... (8.9) (8.9) 
East protection levee, Morganza to Cut- 
(-) (143.9) 
- 52.5 
- 7.9 
- 55.6 
- 1.6 
- 4.1 
- 1.7 
- 20.5 
(7.8) (77.4) 
(-) 
(-) 
(9.6) 
(8.9) 
(-) (-) 
(-) (-) 
(-) 
(-) 
(-) 
(-) 
(-) (148.4) 
- 52.5 
- 7.9 
- 60.1 
- 1.6 
- 4.1 
- 1.7 
- 20.5 
(-) (127.7) 
(-) (56.5) 
(-) (8.9) 
(-) (43.9) 
20.2 
12.0 
11.7 
(7.8) (76.4) 
(-) 
(-) 
(-) 
(8.9) 
0II Dayou, Iciuuialg ilii s Ut Morganza lower guide levee........ 
Total Atchafalaya Basin....... 
Total-Main Stem Levees............ 
TRIBUTARY LEVEES IN 
MR&T PROJECT 
Lake Pontchartrain, LA ............... 
Item A'levees........... ........ 
Item B levees ....................... 
Item C levees ........................ 
Total.Tributary Levees in MR&T Project 
GRAND TOTAL .................. 
(106.7) (106.7) (6.3) (55.1) (-) (-) (-) (105.0) (6.3) (53.5) 
449.2 449.2 14.1 294.9 - - - 446.5 14.1 182.7 
960.8 960.8 14.1 621.4 10.1 - 1.2 926.1 14.1 662.3 
(17.4) (17.4) (-) (17.4) (-) (-) (-) (17.4) (-) (17.4) 
5.0 5.0 - 5.0 - - - 5.0 - 5.0 
10.1 10.1 - 10.1 - - - 10.1 - 10.1 
2.3 2.3 - 2.3 - - - 2.3 - 2.3 
17.4 17.4 - 17.4 - - - 17.4 - 17.4 
978.2 978.2 14.1 638.8 10.1 - 1.2 943.5 14.1 679.7 
1. Figures indicate landside seepage berms only. 
L!J 
0
O
m
0
L! 
0
0
C 
0
�x 
A
0
-a 
(-) 
(-) 
(-) 
(-) 
(-) 
(-) 
(-) 
(-) 
(-) 
(15.5) 
15.5 
(118.7) 
118.7 
61.7 
37.9 
(34.0) 
34.0 
(2.1) 
(110.8) 
110.8 
11.6 
(19.9) 
19.8 
0.1 
(18.4) 
(4.6) 
4.6 
(13.8) 
13.8 
11.6 
37.4 
479.6 
C12 
C12 
F1 
C,, 
C,, 
Ma 
H 
v . " v w + 
-. .. . , ,

TABLE 42-L PROJECT LEVEES: VICKSBURG DISTRICT 
(FISCAL YEAR 1987) 
Levees and Floodwalls 
(Miles) 
Location 
Authorized 
for 
System 
Total 
In 
Place 
This 
FY 
Built to Approved 
Grade and Section 
Total 
Thru 
This This 
FY FY2 
Berms (Miles)1 
In 
System 
When 
Completed3 
Built 
This 
FY4 
Surfaced Roads on Levees 
(Miles) 
Com- 
~lete 
his 
FY 
In 
System 
hen 
Completed 
Built 
This 
FY 
Total 
Cornm- J 
lete 
hru 
This 
FY 
MAIN STEM LEVEES 
Mississippi River Levees 
East bank in Mississippi ............ 
Greenville Harbor dikes ............ 
West bank in Arkansas ............ 
West bank in Louisiana 
(above Red River) .................. 
Total Mississippi River Levees..... 
Other Levees Included in 
Main Stem 
Lower Red River-South Bank 
Red River levees .................. 
Hotwells to Moncla, LA, levees ..... 
Arkansas River, South bank ....... 
Total Other Levees Included in 
M ain Stem ..................... 
Total-Main Stem Levees ......... 
TRIBUTARY LEVEES IN 
MR&T PROJECT 
Arkansas River, North bank ........ 
Red River Backwater Levees ......... 
Yazoo River Basin .................. 
Headwater........................ 
Backwater ....................... 
Total Tributary Levess in MR&T Project 
GRAND TOTAL ...................... 
178.35 
7.8 
75.6 
178.3 
7.8 
75.6 
- 109.1 
- 7.8 
2.5 50.1 
158.9 
51.7 
114.9 
49.3 
168.4 
75.4 
168.4 
75.4 
198.7 198.7 - 67.1 88.7 - 69.4 197.8 - 1978 
460.4 460.4 2.5 234.1 299.3 - 233.6 442.5 - 442.5 
(59.2) (59.2) (.1) (59.2) (-) (-) (-) (59.2) (-) (33.6) 
59.2 59.2 .1 59.2 - - - 59.2 - 33.6 
85.4 85.4 - 85.4 24.7 - 24.7 84.1 - 81.1 
144.6 144.6 - 144.6 24.7 - 24.7 143.3 - 114.7 
605.0 605.0 2.4 378.7 324.0 - 258.3 585.8 557.2 
61.57 56.2 - 56.2 8.3 - 8.3 47.4 4.0 47.4 
263.6 160.5 - 141.58 - - - 249.0 - 145.9 
(721.3) (356.5) (15.7) (152.4) - - - (717.3) - (320.5) 
624.76 305.6 15.7 152.4 - - - 620.7 (-) 281.5 
96.6 50.9 - 0.0 - - - 96.6 - 39.0 
1,046.4 573.2 15.7 350.1 8.3 - 8.3 1,354.4 4.0 513.8 
1,651.4 1,178.2 18.1 728.8 332.3 - 266.6 1,940.2 4.0 1,071.0 
1. This tabulation does not include riverside berms 
which are considered an integral part of the levee section. 
Riverside berms will be constructed along with levee enlargements 
or seepage berm contracts. 
2. Levee that has adequate freeboard based on the 
refined 1973 MR&T project flood flow line for the Mississippi 
River. Levees with more than 2 feet of freeboard are 
considered adequate. 
3. Subject to change as planning progresses. Does not 
include existing berms which need restudy. 
4. Based on refined 1973 MR&T project flood flow line. 
5. Includes 1.4 miles of concrete floodwall and 0.3 mile 
of levee on Vicksburg city front. 
6. Includes 36.9 miles of local protection works 61.3 
miles along Whittington Auxiliary Channel; 210 miles in 
Upper Yazoo Projects; 156.1 miles along main stem; and 
160.4 miles on tributaries. 
7. Includes 5.3 miles for Gillett new levee. 
8. Reflects results of 1985 flowline reanalysis. 
0a 
n
HT 
0
0x 
0
0
OT 
0o 
_I _ __ _ _ _~ _ __ 
- --

TABLE '42-M PROJECT LEVEES: MEMPHIS DISTRICT 
(FISCAL YEAR 1987) 
Levees and Floodwalls Berms (Miles)' Surfaced Roads on Levees 
(Miles) (Miles) 
Built to Approved Total 
Location Total Grade and Section In In Com- 
In Total System Comrn- System plete 
Authorized Place Thru When Built plete When Built 
for This This This Com- This This Com- This This 
System FY FY FY pleted' FY FY pleted FY FY 
MAIN STEM LEVEES 
Mississippi River 
Mounds, IL ......................... 
Mound City, IL ..................... 
Cairo Drainage District ............. 
City of Cairo ........................ 
Little River Drainage District ........ 
Levee District No. 2, 
Scott County, MO ................. 
Levee District No. 3, 
Mississippi County, MO ............. 
St. Johns Leveee and 
Drainage District .................. 
St. Francis Levee District of MO ...... 
City of Hickman, KY................ 
Board of Levee Commissioners 
Fulton County, KY ................. 
Reelfoot Levee District of Lake and 
Obion Counties, TN ................ 
Madrid Bend Levee District, 
Lake Co., TN ...................... 
Lake Count Levee and 
Drainage District .................. 
Dyer Count Levee and 
Drainage District No. 1 ............. 
Tipton-Obion levee extension ........ 
St. Francis Levee District of AR ...... 
Helena Improvement District No. 1 ... 
Cotton Belt Levee District No. 1 ...... 
Laconia Drainage and Levee District 
Phillips County, AR ................ 
Laconia Levee District No. 1 of 
Desha County, AR .................. 
Laconia Circle Special Drainage 
District of Desha County, AR ........ 
Yazoo-Mississippi Delta Levee 
D istrict ............................ 
3.9 
2.7 
13.82 
6.2 
19.3 
3.9 
2.7 
13.8 
6.2 
19.3 
13.8 13.8 
26.0 26.0 
59.03 
55.7 
1.4 
58.7 
55.7 
1.4 
3.9 
2.7 
13.8 
6.2 
19.3 
13.8 
26.0 
58.2 
55.7 
1.4 
16.7 16.7 
4.5 4.5 
5.2 5.2 
15.9 15.9 
21.3 
6.5 
156.7 
5.3 
23.9 
21.3 
156.7 
5.3 
23.9 
0.5 
2.5 
4.6 
4.4 
4.9 
4.2 
12.9 
43.0 
23.0 
.0 .5 
- 1.7 
- 2.0 
1.1 4.9 
4.9 26.0 
12.0 
16.74 15.5 11.4 
4.54 
5.24 
15.9 
- 21.3 
- 153.24 
- 5.3 
- 23.9 
20.5 20.5 
18.1 
20.5 
18.1 
6.6 6.6 
0.6 
9.1 
1.3 
94.6 
2.4 
18.8 
11.5 
0.3 4.5 
5.2 
4.5 15.9 
- 0.4 
1.5 81.8 
- 2.4 
- 18.8 
11.5 
18.14 12.9 9.2 16.5 
6.6 4 
93.6 93.6 - 93.6 87.3 
3.6 
1.1 
8.5 
4.0 
19.3 
13.8 
46.9 
55.1 
0.5 
16.3 
3.6 
1.1 
8.5 
3.5 
19.3 - 
CI, 
13.8 
26.0 
46.1 C 
55.1 
- c 
16.3 
4.3 
5.2 z 
15.9 
21.3 
156.7 
4.2 
23.9 
20.5 
16.5 
21.3 
6.5 
156.7 
4.7 
23.9 
20.5 
87.3 3.6 -93.6

TABLE 42-M 
(Continued) 
PROJECT LEVEES: MEMPHIS DISTRICT 
(FISCAL YEAR 1987) 
Levees and Floodwalls Berms (Miles)1 Surfaced Roads on Levees 
(Miles) (Miles) 
Built to Approved Total 
Location Total Grade and Section In In Corn- 
In Total System Com- S stem lete 
Authorized Place Thru When Built lete hen Built hru 
for This This This Com- This his Com- This This 
System FY FY FY pleted' FY FY pleted FY FY 
Mississippi River Levees (continued) 
Madrid Bend L.D., 
Fulton Co., KY ..................... 4.4 4.4 - 4.44 - - - 4.4 - 4.4 
Birds Point-New Madrid 
setback levee ...................... 35.3 35.3 - 35.3 35.3 - - 35.3 - 35.3 
Total Mississippi River ........... 636.3 629.5 - 625.5 389.3 2.6 253.6 604.1 - 595.1 
TOTAL MAIN STEM LEVEES ..... 636.3 629.5 - 625.5 389.3 2.6 253.6 604.1 - 595.1 
TRIBUTARY LEVEES IN 
MR&T PROJECT 
St. Francis River . .................... (308.2) (302.9) - (302.9) - - - (301.0) (7.0) (127.5) 
East bank ........................... 159.5 156.2 - 156.2 - - - 156.7 7.0 88.7 
West bank ........................ 148.7 146.7 - 146.7 - - - 144.3 - 38.8 
Little River .......................... (130.1) (130.1) - (130.1) - - - (128.9) - East (67.5) bank (left) ..................... 40.7 40.7 - 40.7 - - - 40.7 - 13.1 
West bank ......................... 35.1 35.1 - 35.1 - - - 35.1 - 23.7 
Elk Chute ........................... 39.9 39.9 - 39.9 - - - 39.7 - 17.3 
West Basin and middle valley ........ 14.4 14.4 - 14.4 - - - 13.4 - 13.4 
Lower White River .................. (95.6) (85.9) - (84.1) - - - (88.0) - (75.0) 
White River backwater levee .......... 40.2 40.2 - 40.2 - - - 38.8 - 38.8 
Augusta to Clarendon ............... . 49.2 39.5 - 39.5 - - - 49.2 - 36.2 
Clarendon levee ..................... 6.2 6.2 - 4.4 ...... 
Memphis Harbor ..................... 10.5 10.5 - 10.5 7.0 - 1.5 10.5 - 10.5 
Total Tributary Levees in 
MR&T Project .................... 544.4 529.4 - 527.6 7.0 - 1.5 528.4 7.0 355.5 
GRAND TOTAL ...................... 1,180.7 1,158.9 - 1,153.1 396.3 2.6 255.1 1,387.6 7.0 951.6 
int 
0 
1. Subject to change as planning progresses. 
2. Includes 5.1 miles of Cache River levee. This levee 
was enlarged to 1928 grades with Federal funds, but since 
that time has been classified as a secondary levee. 
3. Includes 12.1 miles of Farrenburg levee. This levee 
was enlarged to 1928 grades with Federal funds, but since 
that time has been classified as a secondary levee. 
4. Shown complete. Authority MSRC-ED-TL (MD 19 
Mar. 80) 1st Ind. 21 Apr. 80. 
0
0
0
0
0
0
0I
CD, 
0
A
PC 
4C 
O
O 
z
A

TABLE 42-N 
RECAPITULATION 
PROJECT LEVEE TABLES 42-K, -L, AND -M 
(FISCAL YEAR 1987) 
Levees and Floodwalls Berms (Miles) Surfaced Roads on Levees 
(Miles) (Miles) 
Built to Approved Total 
Location Total Grade and Section In In Com- 
In Total System Comrn- System plete 
Authorized Place Thru When Built plete When Built Thru 
for This This This Con- This This Corn- This This 
System FY FY FY pleted FY FY pleted FY FY 
MAIN STEM LEVEES 
Mississippi River 
New Orleans District, Table 42-K ..... 511.6 511.6 
Vicksburg District, Table 42-L ....... 460.4 460.4 
Memphis District, Table 42-M ........ 636.3 629.5 
Total Mississippi River ......... 
Other Levees Included in Main Stem 
Atchafalaya Basin 
Floodway-NOD .................. 
Lower Red River- 
South Bank-VXD ................ 
Arkansas River-South Bank-VXD.... 
Total Other Levees Included 
in Main Stem ................... 
Total Main Stem Levees ......... 
TRIBUTARY LEVEES IN 
MR&T PROJECT 
Lake Pontchartrain, LA,-NOD ........ 
Yazoo River Basin-VXD ............. 
Arkansas River-North Bank-VXD ..... 
Red River Backwater-VXD .......... 
St. Francis River-MD ................ 
Little River-MD ..................... 
Lower White River-MD .............. 
Memphis Harbor-MD ................ 
Total Tributary Levees in 
MR&T Project .................... 
- 326.5 10.1 
2.5 234.1 299.3 
- 625.5 389.3 
(-) 1.2 479.6 
2.3 233.6 442.5 
2.6 253.6 604.1 
- 479.6 
- 442.5 
- 595.1 
1,608.3 1,601.5 2.5 1,186.1 698.7 4.9 488.4 1,526.2 - 1,517.2 
449.2 449.2 14.1 294.9 - - - 446.5 14.1 182.7 
59.2 59.2 - 59.2 - - - 59.2 - 33.6 
85.4 85.4 - 85.4 24.7 - 24.7 84.1 - 81.1 
593.8 593.8 14.1 439.5 24.7 - 24.7 589.8 14.1 297.4 n 
2,202.1 2,195.3 16.6 1,625.6 723.4 4.9 513.1 2,116.0 14.1 1,814.6 
17.4 17.4 - 17.4 - - - 17.4 - 17.4 
721.3 356.5 15.7 152.4 - - - 717.3 - 320.5 4 
61.5 56.2 - 141.5 8.3 - 8.3 47.4 - 47.4 
263.6 160.5 2.8 141.5 - - - 249.0 4.0 145.9 
308.2 302.9 - 302.9 - - - 301.0 7.0 127.5 
130.1 130.1 - 130.1 - - - 128.9 - 67.5 
95.6 85.9 - 84.1 - - - 88.0 - 75.0 
10.5 10.5 - 10.5 7.0 - 1.5 10.5 - 10.5 
1,608.2 1,120.0 18.5 895.1 15.3 - 9.8 1,559.5 11.0 811.7 
Grand Total in Project............3,810.3 3,315.3 35.1 2,520.7 738.7 4.9 522.9 3,675.5 25.1 2,626.3 
Grand Total in Project ........... . . 3,810.3 3,315.3 35.1 2,2. 737 4.9 22.9 3,65.5 5.1 2,626.3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 42-0 CHANNEL IMPROVEMENTS: NEW ORLEANS DISTRICT 
(FISCAL YEAR 1987) 
In Total 
System Complete 
Year When Built Thru 
Location Initi- Corn- This This Percent 
ated pleted FY FY Complete 
(Miles) 
Bayou des Glaise diversion channel ................ 1938 6.0 - 6.0 100 
Bayous Rapides, Boeuf, and Cocodrie .............. 1946 92.6 - 63.4 75 
Charenton drainage and navigation canal .......... 1939 6.3 - 6.3 100 
Wax Lake Outlet ................................. 1938 15.7 - 15.7 100 
Atchafalaya Basin Floodway ..................... 1933 244.2 - 186.4 76 
Morganza Floodway ............................. 1941 3.3 - 3.3 100 
Old River outflow channel ........................ 1956 8.3 - 8.3 100 
Old River inflow channel ......................... 1960 2.3 - 2.3 100 
Old River lock approach channels .................. 1961 2.2 - 2.2 100 
Baton Rouge Harbor (Devils Swamp) .............. 1958 2.5 - 2.5 100 
Eastern Rapides-S.C. Avoyelles .................... - 83.5 - - 
Teche-Vermillion Water Supply ................... . - 6.3 - 6.3 100 
42-52

MISSISSIPPI RIVER COMMISSION 
TABLE 42-P CHANNEL IMPROVEMENTS: VICKSBURG DISTRICT 
(FISCAL YEAR 1987) 
In Total 
System Complete 
Year When Built Thru 
Location Initi- Comn- This This Percent 
ated pleted FY FY Complete 
(Miles) 
BIG SUNFLOWER RIVER, ETC., MS 
Big Sunflower River .............................. 1947 199.1 - 199.1 100 
Quiver River ..................................... 1947 69.6 - 69.6 100 
Deer Creek ....................................... 1947 7.0 - 7.0 100 
Steele Bayou ..................................... 1947 54.9 - 54.9 100 
Steele Bayou' .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1965 71.2 - 63.0 70 
Main Canal ...................................... 1959 21.1 - 21.1 100 
M ain Canal2 .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - 22.2 - - - 
Black Bayou ...................................... - 36.5 - - - 
Big Sunflower River tributaries ................... 1957 227.2 - 227.2 100 
Quiver River tributaries .......................... 1960 35.4 - 35.4 100 
YAZOO BACKWATER 
Yazoo Backwater ................................. 1960 39.9 - 39.9 100 
YAZOO BASIN HEADWATER, MS 
Upper Yazoo Project ............................. 1976 179.0 - 55.7 31 
Coldwater River ................................. 1941 54.6 - 54.6 100 
Arkabutla Canal .................................. 1948 0.4 - 0.4 100 
Tallahatchie Canal ............................... 1940 74.8 - 73.5 85 
Little Tallahatchie River and 
Panola-Quitman Floodway ..................... 1939 48.0 - 48.0 100 
Greenwood protection works ...................... 1971 2.9 - 2.9 100 
Yacona River .................................... 1952 1.8 - 1.8 100 
Bobo Bayou ....................................... 1944 16.1 - 16.1 100 
Cassidy Bayou ................................... 1934 69.0 - 69.0 100 
Cassidy Bayou 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - 26.0 - - - 
Bear Creek Diversion ............................ - 4.8 - - - 
Lake Cormorant ................................. - 20.9 - - - 
Hurricane Bayou ................................ - 2.5 - - - 
Opossum Bayou ................................... - 20.8 - - - 
Abaica Creek .................................... - 7.7 - - - 
Chicopa Creek ................................... - 7.0 - - - 
Bear Creek ...................................... - 23.3 - - - 
Rocky Bayou .................................... - 7.8 - - - 
W hiteoak Bayou ................................. - 55.9 - - - 
Miscellaneous ditches ............................. - 12.3 - - - 
Yalobusha River ................................. 1939 46.0 - 46.0 100 
Yazoo River ..................................... 1940 160.2 - 160.2 100 
Whittington Auxiliary Channel .................... 1956 30.8 - 30.8 100 
Tchula Lake ...................................... 1964 26.4 - 26.4 100 
David-Burrell Bayou ............................. 1957 40.4 - 40.4 100 
McKinney Bayou ................................ 1960 3.5 - 3.5 100 
Hillside Floodway ............................... 1964 11.0 - 11.0 100 
Yazoo City protection works ...................... 1953 1.6 - 1.6 100 
-Ascalmore-Tippo Bayous......................... 1975 30.2 - 15.1 50 
Alligator-Catfish Bayou .......................... 1973 8.3 - 8.2 99 
Pelucia Creek ..................................... 1975 8.3 0.8 6.6 80 
BOEUF & TENSAS RIVERS, ETC., 
LA AND AR 
Bayou Lafourche ................................. 1949 45.3 - 45.3 100 
Bayou Lafourche4,7 ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1972 43.0 - 4.4 10 
Big & Colewa Creeks ............................. 1947 81.4 - 81.4 100 
42-53

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 42-P CHANNEL IMPROVEMENTS: VICKSBURG DISTRICT 
(Continued) (FISCAL YEAR 1987) 
In Total 
System Complete 
Year When Built Thru 
Location Initi- Com- This This Percent 
ated pleted FY FY Complete 
(Miles) 
BOEUF & TENSAS RIVERS, ETC., 
LA AND AR- continued 
Bayou Lafourche ................................ 
Bayou Lafourche4 ,7 ...... . . . . . . . . . . . . . . . . . . . . . . . . . 
Big & Colewa Creeks ............................ 
Big & Colewa Creeks5,7 ......... . . . . . . . . . . . . . . . . . . . . 
Tensas River .................................... 
Tensas River 6 ....... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
Boeuf River, AR and LA .......................... 
Fleschmans Bayou, AR .......................... 
Caney Bayou, AR ................................ 
Canal 18, AR .................................... 
Big Bayou, AR ................................... 
Black Pond Slough, AR ............................ 
Bayou Macon, AR and LA 
Rush Bayou, AR ................................. 
Canal 19, AR ...................................... 
Canal 43, AR .................................... 
Canal 81, AR .................................... 
Mill Bayou-Bayou Vidal-Bayou Vidal Cutoff ....... 
Kirsch Lake Canal ............................... 
Canal 19 Extension .............................. 
Lake Chicot Pumping Plant ...................... 
M ill Bayou ...................................... 
RED RIVER BACKWATER, LA 
Tensas-Cocodrie Pumping Plant ................... 
Six M ile Bayou, LA .............................. 
GRAND PRAIRIE, AR .......................... 
BAYOU METO, AR ............................. 
1. Includes further work on 54.9 miles and adds 16.3 
miles of channel to the project. 
2. Includes further work on 21.1 miles and adds 1.1 
miles of channel to the project. 
3. Includes further work on 26.0 miles. 
4. Includes further work on 38.6 miles and adds 4.4 
miles of channel to the project. 
5. Includes further work on 75.3 miles and adds 11.5 
miles of channel to the project. 
6. Includes further work on 96.5 miles and adds 68.5 
additional miles of channel to the project. 
7. Further work on these items has been deferred due 
to local oppositions and withdrawal of sponsorship by the 
levee district. 
42-54 
1949 
1972 
1947 
1965 
1947 
1968 
1953 
1963 
1964 
1963 
1952 
1962 
1959 
1964 
1957 
1956 
1957 
1964 
1955 
1976 
45.3 
4.4 
81.4 
51.5 
96.5 
61.0 
103.9 
6.6 
7.4 
10.3 
33.3 
14.3 
150.8 
6.7 
50.2 
34.5 
32.7 
9.4 
2.5 
4.8 
45.3 
43.0 
81.4 
86.8 
96.5 
165.0 
103.9 
6.6 
7.4 
10.3 
33.3 
14.3 
150.8 
6.7 
50.2 
34.5 
32.7 
17.1 
9.3 
9.4 
2.5 
4.8 
6.9 
1.5 
338.1 
164.9 
100 
10 
100 
60 
100 
37 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
6.9 
1.5

MISSISSIPPI RIVER COMMISSION 
TABLE 42-Q CHANNEL IMPROVEMENTS: MEMPHIS DISTRICT 
(FISCAL YEAR 1987) 
In Total 
System Complete 
Year When Built Thru 
Location Initi- Comn- This This Percent 
ated pleted FY FY Complete 
(Miles) 
BIRDS POINT-NEW MADRID 
FLOODWAY 
Birds Point-New Madrid Intercepting Ditch 
Enlargement, Samos and Vicinity, MO ........... 1952 9.6 - 9.5 100 
ST. FRANCIS BASIN 
Little River Drainage, MO ........................ 1963 298.9 9.0 256.0 86 
St. Francis River, MO and AR .................... 1953 617.1 22.3 412.3 67 
West Memphis Drainage, AR ..................... 1951 19.8 - 19.8 100 
Big Slough and Mayo Ditch, AR ................... 1960 28.0 - 28.0 100 
Tyronza River, AR ............................... 1939 12.7 - 12.7 100 
L'Anguille River, AR ............................ (1) 95.0 - - 
LOWER WHITE RIVER 
BASIN, AR 
Cache River Basin, AR ............................ 1972 231.5 - 7.2 3 
Big Creek and tributaries, AR ..................... (1) 103.8 - - 
WEST KENTUCKY TRIBUTARIES 
Obion Creek, KY ................................. (1) 41.7 - - 
WEST TENNESSEE TRIBUTARIES 
MS River, Western TN tributaries 
(Backwater Areas)(1946 Act) ................... 1952 34.3 - 34.3 100 
Obion River Diversion Channel, 
TN (1946 Act) .................................. (1) 9.3 - - 
Reelfoot Lake-Lake No. 9, KY 
and TN ....................................... 1974 15.8 - 3.0 19 
Running Reelfoot Bayou, TN ...................... 1955 19.7 - 19.7 100 
MS River Below Cape Girardeau; West 
TN tributaries. (1948 Act) ...................... 1961 225.0 - 92.5 40 
Wolf River and tributaries, TN .................... 1960 25.5 - 25.5 100 
1. Not started. 
42-55

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 42-R COSTS DURING FISCAL YEAR 1987 
Item Construction Maintenance Other 
FEDERAL FUNDS 
Flood control, Mississippi River and tributaries: 
St. Louis District: 
General investigations 
Advance engineering and design 
St. Francis Basin-Wappapello Lake 
Subtotal 
Memphis District: 
General investigations 
Advance engineering and design 
Mississippi River levees 
St. Francis Basin 
Lower White River 
Cache Basin, Ark. 
Channel improvement 
West Tennessee tributaries 
West Kentucky tributaries 
Inspection of completed works 
Mapping 
Reelfoot Lake No. 9, TN-KY 
Mud Lake, TN 
Eight Mile Creek 
Devalls Creek Pumping Station 
Subtotal 
Vicksburg District: 
General investigations 
Advance engineering and design 
Mississippi River levees 
Lower Arkansas River 
Tensas Basin 
Yazoo Basin 
Channel improvement 
Mapping 
Inspection of completed works 
Tensas National Wildlife Refuge, LA 
Lower Red River-South Bank Red River Levee 
Dam Safety Assurances 
5,766,613 
8,598,497 
284,349 
16,872,802 
2,355,882 
247,461 
5,402 
11,006 
404,448 
34,546,460 
2,551,340 
7,081,199 
24,939,211 
20,771,671 
12,300 
21,742 
1,782,812 
$ - -- 
4,001,211 
4,001,221 
2,516,956 
3,583,241 
487,207 
25,278,967 
630,259 
204,356 
221,023 
32,922,009 
684,380 
950,446 
3,181,680 
19,875,928 
11,831,263 
311,623 
179,140 
66,683 
Subtotal 
New Orleans District: 
General investigations 
Advance engineering and design 
Mississippi River levees 
Old River 
Bayou Cocodrie and tributaries 
Atchafalaya Basin 
Atchafalaya Basin Floodway System 
Channel improvement 
Teche-Vermilion Basin water supply 
Inspection of completed works 
Mapping 
Subtotal 
Total Federal Funds 
57,160,275 37,081,143 2,042,333 
-- -- 1,570,670 
9,477,970 4,381,623 -- 
8,202,823 13,757,728 -- 
109,096 98,159 -- 
23,203,249 6,171,737 -- 
283,323 -- -- 
35,907,722 11,582,228 -- 
-- 242,637 -- 
-- 171,396 -- 
77,184,183 36,405,508 1,570,670 
168,890,918 110,409,871 6,296,443 
42-56 
2,683,440 
-- 
-- 
-- 
-- 
-- 
--
-- 
-- 
2,683,440 
2,042,333 
-- 
______1_1________1________~~ ___

TABLE 42-R 
(Continued) 
MISSISSIPPI RIVER COMMISSION 
COSTS DURING FISCAL YEAR 1987 
Item Construction Maintenance Other 
CONTRIBUTED FUNDS 
New Orleans District: 
Old River -- 70,032 -- 
Atchafalaya Basin 3,303 (205) -- 
Mississippi River Levees 118,000 -- -- 
Channel Improvement -- 12,826 
Total Contributed Funds 121,303 69,827 -- 
Grand Total, Federal 
and Contributed Funds 169,012,221 110,479,698 6,296,443 
42-57

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 42-S STATEMENT OF ALLOTMENTS AND ACCRUED 
EXPENDITURES FOR FLOOD CONTROL, 
MISSISSIPPI RIVER AND TRIBUTARIES, 
FROM MAY 15, 1928, THROUGH SEP. 30, 1987 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures Sep. 30, 1987 
ALLOTMENTS AND ACCRUED EXPENDITURES 
CHARGEABLE AGAINST FLOOD CONTROL 
ACT LIMITATIONS: 
COMPLETED WORKS: 
Waterways Experiment Station 
Office, Chief of Engineers 
Rock Island District: 
S. G. & O. prior to Aug. 18, 1941 
St. Louis District: 
S. G. & O. prior to Aug. 18, 1941 
Subtotal 
Memphis District: 
Des Arc, Ark. 
Contraction works 
DeValls Bluff, Ark. 
Mapping 
Memphis Harbor 
New Madrid Floodway 
Wolf River and tributaries 
Roads on levees (Mississippi River levees) 
S. G. & O. prior to Aug. 18, 1941 
Subtotal 
Vicksburg District: 
BoeufBasin levees 
Channel realignment, Arkansas River 
Contraction works 
Eudora Floodway 
Vicksburg Harbor 
Greenville Harbor 
Grants Canal (Mississippi River levees) 
Mapping 
Jonesville, LA 
Roads on levees 
S. G. & O. prior to Aug. 18, 1941 
Subtotal 
New Orleans District: 
Baton Rouge Harbor, LA 
Atchafalaya River and Basin, LA 
Bonnet Carr6 Spillway, LA 
Contraction works 
Mapping 
Roads on levees 
S. G. & 0. prior to Aug. 18, 1941 
Wax Lake Outlet and Charenton Canal 
Morganza Floodway and structure 
Lake Pontchartrain 
Atchafalaya Basin, rights-of-way and flowage, 
Bayou des Glaises setback 
Subtotal 
All other completed items: 
Surveys under Sec. 10, Flood Control Act of 1928 
Impounded savings 
Plant transferred to revolving fund 
OCE (portion of allotment transferred to 
revolving fund, Washington Dist.) 
Subtotal 
TOTAL COMPLETED WORKS 
$ 874,000 
19,158 
14,010 
$ 874,000 
19,158 
14,010 
$ 
169,352 169,352 -- 
1,076,520 1,076,520 -- 
178,925 178,925 -- 
8,692,791 8,692,791 -- 
231,215 231,215 -- 
1,450,337 1,450,337 -- 
18,736,432 18,736,432 -- 
6,521,543 6,521,543 -- 
1,723,620 1,723,620 -- 
12,426 12,426 -- 
1,998,766 1,998,766 -- 
39,546,055 39,546,055 -- 
2,764,605 2,764,605 -- 
125,074 125,074 -- 
1,972,183 1,972,183 -- 
826,235 826,235 -- 
4,664,515 4,664,515 -- 
2,864,516 2,864,516 -- 
7,070 7,070 -- 
1,531,021 1,531,021 -- 
172,950 172,950 -- 
105,660 105,660 -- 
2,350,201 2,350,201 -- 
17,384,030 17,384,030 -- 
699,185 699,185 -- 
3,375,492 3,375,492 -- 
14,212,198 14,212,198 -- 
1,258,916 1,258,916 -- 
1,112,967 1,112,967 -- 
540,838 540,838 -- 
2,701,566 2,701,566 -- 
10,098,817 10,098,817 -- 
35,992,117 35,992,117 -- 
5,513,110 5,513,110 -- 
387,917 387,917 -- 
75,893,123 75,893,123 -- 
4,995,215 4,995,215 -- 
1,593,097 1,593,097 -- 
24,924,578 24,924,578 -- 
19,882 19,882 -- 
31,532,772 31,532,772 -- 
165,432,500 165,432,500 -- 
42-58

MISSISSIPPI RIVER COMMISSION 
TABLE 42-S 
(Continued) 
STATEMENT OF ALLOTMENTS AND ACCRUED 
EXPENDITURES FOR FLOOD CONTROL, 
MISSISSIPPI RIVER AND TRIBUTARIES, 
FROM MAY 15, 1928, THROUGH SEP. 30, 1987 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures Sep. 30,1987 
UNCOMPLETED WORKS: 
Rock Island District: 
Levees under Sec. 6, Flood Control Act of 1928 
St. Louis District: 
Levees under Sec. 6, Flood Control Act of 1928 
Subtotal 
Memphis District: 
Mississippi River levees 
Mississippi River levees 
New Madrid 
Channel improvement: 
Revetments 
Dredging 
Dikes 
Reelfoot Lake 
Reelfoot Lake, Lake No. 9, TN-KY 
St. Francis Basin: 
Wappapello Lake 
St. Francis River and tributaries 
Big Slough and Mayo ditch 
Little River drainage 
Lower White River: 
Clarendon Levee 
Augusta to Clarendon, AR 
White River backwater levee, AR 
Levees under Sec. 6, Flood Control Act of 1928 
West Tennessee tributaries 
Cache Basin, AR 
West Kentucky tributaries 
Mud Lake Pumping Station, TN 
Eight Mile Creek 
Subtotal 
Vicksburg Distict: 
Mississippi River levees (excludes Grants Canal, 
$7,070, shown under completed works) 
Lower Arkansas River: 
North Bank 
South Bank 
Tensas Basin: 
Lake Chicot pumping plant 
Boeuf and Tensas Rivers, etc. 
Red River Backwater: 
Red River backwater levee, LA 
Tensas, Cocodrie pumping plant 
Lower Red River South Bank Red River Levees 
Tensas National Wildlife Refuge, LA 
Channel improvement: 
Revetments 
Dredging 
Dikes 
Levees under Sec. 6, Flood Control Act of 1928 
Yazoo Basin: 
Sardis Lake 
Enid Lake 
Arkabutla Lake 
Grenada Lake 
Greenwood 
579,462 
1,897,980 
2,477,442 
169,053,354 
98,000 
333,714,307 
57,249,400 
116,945,000 
439,434 
7,895,000 
9,019,908 
197,728,982 
965,429 
48,388,292 
496,715 
1,779,846 
10,624,501 
108,651 
38,056,900 
8,250,000 
1,440,000 
107,000 
865,000 
1,003,225,720 
199,139,990 
7,049,414 
15,676,286 
903,385,400 
40,919,200 
54,022,446 
52,781,900 
438,400 
39,800,000 
363,701,065 
23,549,260 
84,997,040 
958,175 
26,523,300 
21,292,400 
16,000,700 
45,355,100 
11,543,000 
579,462 
1,897,980 
2,477,442 
169,024,042 
98,000 
333,653,009 
57,249,400 
115,896,560 
439,434 
7,877,053 
9,019,908 
197,482,385 
965,429 
48,356,251 
496,715 
1,779,846 
10,624,501 
108,651 
36,906,187 
8,214,183 
1,341,407 
91,175 
827,874 
1,000,452,011 
196,263,793 
7,049,414 
15,676,286 
89,327,526 
40,817,070 
53,807,982 
52,471,678 
253,066 
39,800,000 
363,391,547 
23,549,260 
84,103,700 
958,175 
26,505,111 
21,292,400 
16,000,700 
45,353,833 
11,543,000 
42-59 
29,312 
61,298 
1,048,440 
17,947 
246,597 
32,042 
1,150,713 
35,817 
98,593 
15,825 
37,126 
2,773,709 
2,876,197 
1,057,874 
102,130 
214,464 
310,222 
185,334 
309,518 
893,340 
18,189 
1,267

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 42-S 
(Continued) 
STATEMENT OF ALLOTMENTS AND ACCRUED 
EXPENDITURES FOR FLOOD CONTROL, 
MISSISSIPPI RIVER AND TRIBUTARIES, 
FROM MAY 15, 1928, THROUGH SEP. 30, 1987 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures Sep. 30,1987 
Yazoo Basin: (Continued) 
Belzoni 
Yazoo City 
Will M. Whittington auxiliary channel 
Big Sunflower, etc. 
Main Stem 
Upper Yazoo Projects 
Yazoo Basin-Tributaries 
Tributaries (Except Ascal-Tippo-Opossum Bayous) 
Tributaries-Bank Stabilization 
Ascalmore-Tippo-Opossum Bayous 
Yazoo Basin Backwater 
Yazoo Backwater (Except Muddy Bayou) 
Muddy Bayou 
Steambank Erosion Control, Eval. and Demo. 
Demonstration Erosion Control 
Dam Safety Assurances-Sardis Dam 
Subtotal 
New Orleans District: 
Teche-Vermilion Basin Water Supply 
Bayou Cocodrie and Tributaries 
Channel improvement: 
Dredging 
Revetments 
Lower Red River (South Bank Levees) 
Levees Under Sec. 6, Flood Control Act of 1928 
Mississippi River Levees 
Mississippi Delta Region 
Atachafalaya Basin: 
Atachafalaya Basin Floodway 
Atachafalaya River Navigation 
Atachafalaya Basin Floodway System 
Old River 
Subtotal 
TOTAL UNCOMPLETED WORKS 
ADVANCE ENGINEERING AND DESIGN 
(CONSTRUCTION) 
Memphis District: 
L'Anguille River Basin, AR 
Reelfoot Lake, Lake No. 9 
Cache River 
Big Creek and Tributaries, Lower White River 
Clarendon Levee, Lower White River 
West Kentucky Tributaries 
Mud Lake Pumping Station, TN 
Harris Fork Creek, KY & TN 
Subtotal 
Vicksburg District: 
Yazoo Basin, Big Sunflower River, Steele Bayou 
Tensas - National Wildlife Refuge, LA 
Subtotal 
316,656 
2,205,611 
10,950,966 
38,866,000 
32,898,400 
63,558,506 
65,774,610 
612,484 
24,337,100 
67,147,600 
5,145,200 
14,767,000 
19,471,900 
3,740,000 
1,443,925,110 
33,806,000 
5,029,008 
35,945,266 
565,363,117 
18,056,600 
200,680 
217,549,000 
100,000 
561,619,537 
303,463 
561,000 
290,274,000 
1,728,807,671 
316,656 
2,205,611 
10,950,966 
35,986,476 
30,474,546 
54,100,065 
65,139,342 
612,484 
23,937,426 
64,917,689 
5,145,200 
14,767,000 
15,349,052 
1,792,846 
1,413,859,901 
33,806,000 
5,007,796 
35,945,266 
564,620,721 
18,056,600 
200,680 
216,167,343 
552,119,433 
303,463 
444,102 
289,109,264 
1,715,780,668 
2,879,524 
2,423,854 
9,458,440 
635,268 
399,674 
2,229,911 
4,122,848 
1,947,154 
30,065,208 
21,212 
742,396 
1,381,657 
100,000 
9,500,104 
116,898 
1,164,736 
13,027,003 
4,178,435,942 4,132,570,023 45,865,920 
150,000 150,000 -- 
30,000 30,000 - 
420,000 420,000 -- 
365,000 364,339 -- 
65,000 65,000 -- 
175,000 175,000 -- 
350,000 350,000 -- 
540,000 540,000 -- 
2,095,000 2,095,000 -- 
29,700 29,700 -- 
200,000 200,000 -- 
229,700 229,700 -- 
42-60 
--

MISSISSIPPI RIVER COMMISSION 
TABLE 42-S 
(Continued) 
STATEMENT OF ALLOTMENTS AND ACCRUED 
EXPENDITURES FOR FLOOD CONTROL, 
MISSISSIPPI RIVER AND TRIBUTARIES, 
FROM MAY 15, 1928, THROUGH SEP. 30, 1987 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures Sep. 30,1987 
New Orleans District: 
Mississippi Delta Region 69,753 69,753 -- 
Teche Vermilion Basin-Water Supply 1,109,000 1,109,000 -- 
East Rapides & S. Central Avoyelles Parishes 965,247 965,247 -- 
Subtotal 2,144,000 2,144,000 -- 
TOTAL ADVANCE ENGINEERING 
AND DESIGN 4,468,700 4,468,700 -- 
TOTAL COMPLETED WORKS, UNCOMPLETED 
WORKS AND ADVANCE ENGINEERING 
AND DESIGN 4,348,337,142 4,302,471,222 45,865,920 
RECREATION FACILITIES-COMPLETED 
PROJECTS 
Eight-Year Program Funds 
St. Louis District: 
Wappapello Lake, MO 2,405,300 2,404,890 410 
Wappapello Lake, MO, Rockwood Landing 203,286 203,286 -- 
Subtotal 2,608,586 2,608,176 410 
Vicksburg District: 
Sardis Lake 1,584,339 1,584,339 -- 
Enid Lake 2,268,209 2,268,209 -- 
Arkabutla Lake 2,189,280 2,189,280 -- 
Grenada Lake 1,631,281 1,631,281 -- 
Subtotal 7,673,109 7,673,109 -- 
Total Eight-Year Program Funds 10,281,695 10,281,285 410 
Total chargeable against Flood Control 
Act Limitations excluding flood 
control emergencies 4,358,618,837 4,312,752,917 45,865,920 
Total maintenance since Aug. 18, 1941 1,699,830,855 1,694,762,049 5,068,806 
Total rehabilitation 31,113,000 31,113,000 -- 
Total flood control emergencies 14,900,300 14,900,300 -- 
Total general investigations 66,231,881 64,525,573 1,706,309 
Total flood control, MR&T appropriations 6,170,694,873 6,118,053,839 52,641,035 
Appropriations in addition to flood control, MR&T 
Other appropriations itemized in footnote (1), 
pp. 2068-69, Annual Report for 1953 32,068,909 32,068,909 -- 
Grand total appropriated to Sep. 30, 1986 6,202,763,782 6,150,122,747 52,641,035 
Note: Preauthorization study costs chargeable to the MR&T authorization have been transferred to completed work. Costs 
not chargeable have been exluded from this report. 
42-61

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 42-T STATEMENTS OF EXPENDITURES FOR LEVEES 
BY STATE AND LOCAL ORGANIZATIONS 
THROUGH DEC. 31, 1986 
Engineer 
District 
St. Louis 
Memphis 
Vicksburg 
New Orleans 
Total 
Expenditures 
$ 70,448,732 
262,982,832 
130,201,691 
561,325,260 
$1,024,958,515 
42-62

MISSISSIPPI RIVER COMMISSION 
TABLE 42-U COST AND FINANCIAL STATEMENT 1 
Total 
Project Funding FY 84 FY 85 FY 86 FY 87 Sep. 30, 1987 
Mississippi River General investigations: 
and tributaries Allotted 6,805,000 4,510,000 6,809,000 5,890,000 66,231,8812 
(Regular Funds)1 Cost 5,722,645 5,499,308 5,955,532 6,296,443 64,525,572 
Construction (includes 
advance engineering 
and design): 
Allotted 199,330,000 216,083,000 194,438,000 192,260,000 4,178,435,942 
Cost 265,108,622 224,369,411 196,535,725 168,890,918 4,132,570,023 
Maintenance 
Allotted 94,345,000 102,554,000 100,480,000 112,403,000 1,750,209,406 
Cost 111,777,503 104,920,222 102,958,345 110,409,871 1,535,300,151 
Rehabilitations 
Allotted -- -- -- -- 31,113,000 
Cost -- -- -- -- 31,113,000 
Flood control 
emergencies 
(Maintenance): 
Allotted -- -- -- -- 14,885,922 
Cost -- -- -- -- 14,885,922 
(Contributed Funds) New Work: 
Contributed 46,311 315,294 20,000 124,692 9,705,463 
Cost 56,321 63,875 352,749 121,303 9,680,181 
Maintenance 
Contributed 128,923 279,972 169,279 101,108 2,436,122 
Cost 161,616 242,576 139,621 69,827 2,240,151 
1. Appropriations were as follows: 
Appropriations chargeable against Flood Control Act authorizations: 
Flood Control, MR&T except for emergencies (excludes Maintenance 
allotments Aug. 18, 1941, through Sep. 30, 1987): 
Net total allotted for works under Mississippi River Commission: $4,347,917,370 
Eight-Year Program Funds, Construction General: 10,281,695 
Surveys under Sec. 10, Flood Control Act of 1928 (not under MRC): 4,995,215 
Transferred to revolving fund: 24,944,460 
Impounded savings: 1,593,097 $4,389,731,837 
Flood control emergencies: 
Net total allotted: 14,885,922 
Impounded savings: 14,378 14,900,300 
Additional funds not chargeable against Flood Control Act authorizations: 
Appropriations for Flood Control, MR&T, except for flood control emergencies: 
General investigations: 66,231,881 
Maintenance allotments Aug. 18, 1941, through Sep. 30, 1987 1,699,831,855 1,766,063,736 
Appropriations in addition to appropriations for Flood Control, MR&T 
(itemized in footnote (1), pp. 2068-69, Annual Report for 1953): 32,068,909 
Budgetary and OCE Reserves: 
Grand total: 6,202,763,782 
Reconciliation of appropriations and allotments: 
Total allotted to Sep. 30, 1987 6,171,216,632 
Transferred to revolving fund: 24,944,460 
Surveys under Sec. 10, Flood Control Act of 1928 (not under MRC): 4,995,215 
Impounded savings withdrawn by Chief of Engineers: 1,607,475 
Total Appropriations to Sep. 30, 1987: 6,202,763,782 
Appropriations for past four reporting periods were as follows: 
FY 84: $300,480,000; FY 85: $323,297,000; 
FY 86: $301,727,000; FY 87: $310,553,000. 
2. Totals for General Investigations include four projects transferred from 
Construction totals per DAEN-CWB-W, Aug. 4, 78, teletype. 
42-63

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE .42-V 
MISSISSIPPI RIVER AND TRIBUTARIES 
ACTIVE GENERAL INVESTIGATIONS 
(96x3112) 
Item and CWIS Number 
SURVEYS (Category 100) 
Flood Damage Prevention (112) 
New Orleans District 
Atchafalaya Basin Water & Land Res - 12026 
Subtotal 
Vicksburg District 
Boeuf-Tensas Basin, AR & LA-81273 
Larto Lake-Saline Lake, LA - 12065 
Yazoo River Basin,:MS - 12074 
Subtotal 
Memphis District 
Bayou du Chien - 33008 
Eastern AR Reg-Comprehensive Study - 81266 
Mayfield Creek- 10850 
Reelfoot Lake, TN - 00086 
St. Francis River Below Wappapello - 22000 
Tiptonville, TN - 12246 
Tuscumbia River Study - 12408 
Subtotal 
TOTAL (Category 110) 
COLLECTION AND STUDY OF BASIC DATA (Category 120) 
Vicksburg District 
Memphis District 
TOTAL (Category 120) 
SUPPLEMENTAL PRE-AUTH STUDIES (Category 130) 
Flood Damage Prevention 132) 
Vicksburg District 
MS River'East Bank Natchez - 76022 
TOTAL (Category 130) 
CONTINUATION OF PLANNING & ENGINEERING (Category 140) 
Flood Control Projects (142) 
New Orleans District 
MS-LA Estuarine Area ADVCPE - 12193 
Vicksburg District 
Bushley Bayou Area, LA - 75226 
Memphis District 
St. Johns Bayou & New Madrid Fdwy - 77005 
Nonconnah Creek, TN & MS - 12417 
Horn Lake Creek & Tribs/Cowpen Creek - 81282 
TOTAL (Category 140) 
ADVANCE ENGINEERING & DESIGN (Category 160) 
Flood Control Projects (162) 
New Orleans District 
Eastern Rapides & S.C. Avoyelles Parishes - 75031 
Mississippi Delta Region - 23270 
Subtotal 
Federal Cost Totals by 
FY 87 Categories 
($) ($) 
51,596 
51,596 
1,059,779 
137,446 
560,006 
1,757,231 
181,136 
300,773 
462 
170,361 
56,602 
40,000 
347,449 
1,096,783 
2,905,610 
217,685 
72,594 
290,279 
385 
385 
753,227 
67,032 
132,771 
710,030 
185,738 
185,738 1,848,798 
28,568 
737,279 
765,847 
42-64 
_ ~I _ __ _ I __I__ I II I I_IL~- ~L ~ I----Y -~ - __U-U

MISSISSIPPI RIVER COMMISSION 
TABLE 42-V 
(Continued) 
MISSISSIPPI RIVER AND TRIBUTARIES 
ACTIVE GENERAL INVESTIGATIONS 
(96x3112) 
Federal Cost Totals by 
Item and CWIS Number FY 87 Categories 
Memphis District 
Harris Fork Creek, TN & KY - 77009 -0- 
L'Anguille River Basin - 00082 485,524 
Subtotal 485,524 
TOTAL (Category 160) 1,251,371 
GRAND TOTAL MR&T GENERAL INVESTIGATIONS 6,296,443 
42-65

NATURAL DISASTER PREPAREDNESS 
RESPONSE AND RECOVERY ACTIVITIES 
Authoriy. Public Law 84-99, as amended, (Flood Control 
and Costal Emergencies) provides authority for the 
Chief of Engineers to undertake disaster preparedness 
activities, flood fighting and rescue work, rehabilitation 
of flood control works damaged or destroyed by flood, protection 
or repair of Federally authorized shore protective 
works threatened or damaged by coastal storm, provision 
of emergency drinking water, and drought assistance. 
Activities. FY 1987 disaster preparedness activities include 
the review and update of existing emergency 
response plans; development of required new plans; training 
of response personnel exercises to test plans, personnel 
and training procurement and maintenance of critical 
supplies and requirements not readily available during 
initial response phase; maintenance and required 
upgrade of emergency operations centers; coordination 
with Federal, State and local response agencies and other 
public entitites; and overall management of the 
preparedness program. 
The year started with widespread major flooding due 
to very heavy rains which began in late September over 
the northern plains and upper Midwest and moved 
southward in early October. The Corps of Engineers 
responded to requests for assistance in Montana, 
Nebraska, Iowa, Wisconsin, Michigan, Illinois, Kansas, 
Missouri, and Oklahoma. In early October, the remnants 
of Hurricane Paine moved out of Mexico northeastward 
into the Midwest. The result of the additional heavy rains 
was record flooding in parts of Oklahoma, Kansas, and 
Missouri. Numerous Corps of Engineers dams reached 
record levels in their pools. Corps districts across this 
large area provided technical assistance, flood fight 
materials, and in some instances undertook flood fights 
to supplement state and local efforts. The dams in conjunction 
with downstream flood control projects and 
emergency operations prevented over a billion dollars in 
damages. 
During this period, over 100 non-Federal levees were 
either overtopped of ailed. The effort to repair those eligible 
projects continued through the remainder of the year. 
A unique result of this record flooding occurred when the 
lower Missouri River overtopped its north bank, breached 
a railroad embankment, and took a shortcut to the 
Mississippi River several miles north of St. Louis. As the 
flood waters receded, the river returned to its normal 
channel. 
New monthly maximum reocrds continued to be 
established on the middle Great Lakes during the early 
part of the fiscal year and the Corps of Engineers continued 
efforts to identify and undertake appropriate large 
temporary flood protective works. In October, a special 
Self-Help program was instituted. Materials, such as 
sandbags, sand, and plastic sheeting, were provided local 
interests to implement small temporary flood protective 
works. Over $4 million was expended on this program. 
Drier conditions finally began to spread across the Great 
Lakes and no new records were established after 
February. By the end of September, the lakes were from 
one and one-half to two and one-half feet below their monthly 
maximum records. 
In December, Typhoon Kim devastated parts of the 
Commonwealth of the Northern Mariannas, particularly 
the islands of Saipan and Tinian. The Corps of 
Engineers Pacific Ocean Division provided extensive support 
to the Federal Emergency Management Agency 
(FEMA) recovery efforts. In January, Tropical Cyclone 
Tusi hit the islands of American Samoa requiring an extension 
of the support to FEMA to include these Pacific 
islands. 
In early April, major flooding developed across New 
England. Record levels occurred at 25 of the 35 Corps of 
Engineers lakes in the New England Division. The same 
series of storms resulted in moderate flooding of urban 
areas in New York and New Jersey. Corps emergency 
assistance was limited to technical advice and flood fight 
supplies. 
Flooding occurred in many other areas across the country 
during the year. There was localized urban flooding 
in the Lower Mississippi River Valley, the Southeast, and 
the Northeast in February and March. Widespread 
lowland flooding developed across most of the central 
plains states during this same period. Other flood situations 
that developed included: localized flooding in Puerto 
Rico in April due to a tropical depression; widespread 
flooding along major rivers in Virginia in mid-April and 
again in September; widespread small streat flooding in 
southeast Nebraska, southwest Iowa, and northwest 
MIssouri at the end of May and the end of August; 
localized flooding in Ohio, Indiana, and Alabama in early 
July; localized urban flooding in south MIssissippi, south 
Alabama, and the Florida panhandle in August; and, 
widespread urban flash flooding in Chicago and the surrounding 
areas in mid-August. The extent of Corps 
assistance varied as a result of each of these flood 
situations. 
STATUS OF THE PL 84-99 EMERGENCY FUND 
Unallocated Balance as of 30 Sep 86... 
FY 1987 Appropriation .............. 
Revocation FY 1987 ................ 
$ 41,577,252 
10,000,000 
8,832,508 
Totasl Funds Available .............. $ 60,409,760 
Allocations 
Disaster Preparedness ............ . 
Emergency Operations ............. 
Rehabilitation .................... 
Advance Measures ................ 
Hazard Mitigation ................ 
$ 10,475,270 
3,120,245 
17,912,735 
10,379,204 
41,707 
Unallocated Balance as of 30 Sep 87... $ 18,480,599 
43-1

CALIFORNIA DEBRIS COMMISSION 
This Commission, consisting of three Corps officers 
appointed by the President with the consent of the 
Senate, created by act of March 1, 1893 (27 Stat. L., p. 
507), was organized in San Francisco, CA, on June 8, 
1893, and has jurisdiction and duties extending over 
drainage area of Sacramento and San Joaquin Rivers, 
comprising great central valley of California and extending 
from crest of the Sierra Nevada on the east to that of 
the Coast Range on the west, and from Mount Shasta 
and Pit River Basin on the north to Tehachapi Mountains 
on the south. These rivers empty into head of Suisun 
Bay ultimately discharging into Pacific Ocean through 
connecting bays and straits and the Golden Gate. Duties 
of the Commission comprise regulation of hydraulic 
mining in drainage area of Sacramento and San Joaquin 
Rivers, CA, so that debris will not be carried into 
navigable waters or otherwise cause damage; jurisdiction 
over construction and control of water storage 
facilities for domestic, irrigation, and power development 
purposes; and direction of improvements for 
control of floods on Sacramento River. On November 
19, 1986, the Commission was abolished by the Water 
Resources Development Act of 1986 (PL 99-662) and all 
authorities, powers, functions, and duties were transferred 
to the Secretary of the Army. All acquired lands 
and other interests presently under jurisdiction of the 
Commission were authorized to be retained and administered 
under direction of the Secretary. 
IMPROVEMENTS 
Navigation Page 
1. Regulation of hydraulic mining and 
preparation of plans ..................... 44-1 
2. Sacramento River and tributaries, CA 
(debris control).......................... 44-2 
3. Treatment of Yuba River debris 
situation-restraining barriers, CA........ 44-2 
Flood Control 
4. Sacramento River, CA ................... 44-3 
Navigation 
1. REGULATION OF HYDRAULIC 
MINING AND PREPARATION 
OF PLANS 
Location. Operations largely limited to territory 
between Mount Lassen on the north and Yosemite 
Valley on the south, on western watershed of Sierra 
Nevada. (See Geological Survey sheets for the area, 25 
in number.) 
Existing project. Provides for regulating hydraulic 
mining operations, planning improvement of conditions 
upon Sacramento and San Joaquin Rivers and their 
tributaries affected by such operations, and preparation 
of plans to enable hydraulic mining to be resumed in 
their drainage areas. In addition, the Secretary of the 
Army is authorized to enter into contracts to supply 
storage for water and use of outlet facilities from 
debris-storage reservoirs for domestic and irrigation 
purposes and power development upon such conditions 
of delivery, use, and payment as he may approve. 
Applications of prospective miners are fully investigated 
Tables 
Table 44-A 
Table 44-B 
Table 44-C 
Page 
Cost and Financial 
Statement ..................... 44-5 
Authorizing 
Legislation .................... 44-6 
Sacramento 
River CA ...................... 44-7 
by California Debris Commission and permits to operate 
are issued to those who provide satisfactory debrisrestraining 
basins by construction of suitable dams 
where necessary or agree to make payment for storage 
in Government-constructed debris-restraining reservoirs 
constructed under act of June 19, 1934, as set forth 
below. For location and description of Governmentconstructed, 
debris-restraining reservoirs for general 
hydraulic mining, see Improvement 2. 
Local cooperation. Mineowners must bear all expenses 
incurred in complying with orders of the Commission 
for regulation of mining and restraint of debris. 
Operations and results during fiscal year. Minor 
administrative duties were accomplished. Administrative 
work overlaps that of improvements 2, 3, and 4, 
hereunder, and that of Sacramento District. 
Historical summary. The Commission received 1,292 
applications for hydraulic mining licenses; 1 mine is 
licensed, but does not use storage behind Government 
debris dams. Work remaining is, in general, continuation 
of above or similar operations. 
44-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
2. SACRAMENTO RIVER AND 
TRIBUTARIES, CA (DEBRIS 
CONTROL) 
Location. Project reservoirs are to be constructed in 
watersheds of Yuba, Bear, and American Rivers, CA 
(See Geological Survey sheets for basin areas, seven in 
number.) 
Existing project. For description of completed North 
Fork and Harry L. Englebright projects and authorizing 
act, see Annual Report for 1975. Initial recreation 
facilities were provided in FY 1959. Recreation areas at 
Harry L. Englebright Dam are maintained by the 
Corps. Recreation areas at North Fork Dam are no 
longer maintained and operated by Auburn Recreation 
Park and Parkway District, but have been turned over 
to the Bureau of Reclamation (known as the Water and 
Power Resources Service between November 6, 1979, 
and May 18, 1981) on a permit basis. Total Federal cost 
of new work for construction of these reservoirs was 
$4,646,872, including $40,000 and $25,000, respectively, 
for basic recreation facilities at Englebright Dam and 
North Fork Dam. Reservoir project sites on Middle 
Fork of American River and on Bear River have been 
deauthorized and excluded from foregoing cost. The 
90-day Congressional project review period, required 
by sec. 12, Public Law 93-251, as amended, ended 
August 5, 1977, and resulted in deauthorization of that 
portion of the project. Estimated cost of that portion is 
$1,820,000 (1935). 
Local cooperation. Fully complied with. Improvements 
made to facilities at North Fork Dam by Auburn 
Recreation Park and Parkway District under a lease 
agreement with the Secretary of the Army and Auburn 
Boat Clubs (concessionaire) at an estimated cost of. 
$46,000 since September 1953. On March 1, 1979, lands 
and waters at North Fork Dam were turned over to the 
Bureau of Reclamation on a 5-year renewable basis. On 
March 1, 1984, Permit No. DACWO5-4-79-527 was 
renewed for another 5 years and will be effective until 
February 28, 1989. Bureau will operate and maintain 
such use until Auburn project is completed, then a fee 
transfer will be made. Actual operation and maintenance 
of the recreation resource is being done by State 
of California by contract with the Bureau. 
Licenses. Under provisions of Contract No. W-1105- 
eng-2998 with Pacific Gas and Electric Co., payment is 
to be made to the Federal Government of $18,000 per 
year for the first 30 years (December 29, 1942 through 
December 28, 1972) and $48,000 per year between 
December 29, 1972, and December 28, 1992, in return 
for use of head at Englebright Dam and generation of 
hydroelectric power. Total payment through September 
30, 1987, amounts to $1,230,393; these funds 
are paid to California Debris Commission and deposited 
for return to the Treasury. License No. 2246, effective 
April 9, 1970 (date New Narrows powerplant put in 
operation) was issued by Federal Power Commission 
(known as the Federal Energy Regulatory Commission 
since January 9, 1978) to Yuba County Water Agency 
for hydroelectric power development of Yuba River by 
the company upstream from Englebright Dam. Under 
provisions of Contract No. DA-04-167-CIVENG-66-95 
with Yuba County Water Agency, payment is to be 
made to the Federal Government of $100,000 per year 
for no more than 50 years. First payment (partial) of 
$73,151 was made April 1, 1971; total payment through 
September 30, 1987, amounts to $1,673,151. These 
funds are paid to Sacramento District and deposited for 
return to the Treasury. 
Operations and results during fiscal year. New 
work: Maintenance: Maintenance and operation activities 
continued at Harry L. Englebright Dam at a cost of 
$542,572, including recreation facilities. Dam safety 
assurance studies were continued at Englebright Dam 
at a fiscal year cost of $5,615. 
Historical summary. Construction of dams was 
initiated in 1937; North Fork project was completed 
and in use at end of FY 1939, and Harry L. Englebright 
project was completed in January 1941. The two debriscontrol 
structures are in good condition. Public use of 
these reservoir recreation areas greatly overtaxes present 
capacities. Dam safety assurance studies were 
initiated at Englebright Dam in FY 1981. 
3. TREATMENT OF YUBA RIVER 
DEBRIS SITUATIONRESTRAINING 
BARRIERS, CA 
Location. Works are on Yuba River between Marysvilyule 
and where the river emerges from the foothills, 
near Hammonton, some 10 miles easterly from Marysville, 
or about 9 miles below the Narrows. (See Geological 
Survey Topographic map of Sacramento Valley, CA) 
Existing project. For description of completed project 
and authorizing act, see Annual Report for 1975. 
Total cost of new work was $723,259, of which $361,482 
was U.S. funds and $361,777 required contributed 
funds by State of California. (For details of project in its 
original form, see Annual Report, 1917, p. 1810.) In 
February 1963, center section of dam failed and major 
rehabilitation of structure was completed in December 
1964. Total cost for required rehabilitation was 
$1,660,000, of which $830,000 was Federal cost and 
$830,000 required contribution by State of California 
toward rehabilitation cost. During the December 24, 
1964, floodflows on the Yuba River, the rehabilitated 
Daguerre Point Dam sustained considerable damage. 
(See 1965 Annual Report, p. 1647 "Operations and 
results during fiscal year.") The reconstructed portion 
of the dam completed earlier in December 1964 was 
undamaged by the flood. Permanent repair of Daguerre 
Point Dam abutment and fish facilities was completed 
in October 1965 at a cost of $447,808 with Federal and 
required State contributed funds on a matching basis. 
Local cooperation. Fully complied with for new 
work and major rehabilitation work. Total first cost to 
local interests for new work was $361,777 (required 
contribution by State of California). In addition, training 
walls were built on each bank below Daguerre Point for 
44-2

CALIFORNIA DEBRIS COMMISSION 
11,250 feet and just above Daguerre Point, on the south 
bank, for 11,000 linear feet by two gold-dredging 
companies in connection with their dredging operations. 
To build these training walls would have cost the 
United States $450,000 (1902 estimate). Flood channels 
were also built by gold-dredging companies within 
confines of project works. Cost to the United States of 
equally effective works to restrain debris movement 
would have been more than $776,000 (1926 estimate). 
Total costs to local interests for initial and permanent 
major rehabilitation works were $830,000 and $223,904, 
respectively, (required contribution by State of California). 
State of California must contribute annually an 
amount equal to the Federal allotment for maintenance. 
Operations and results during fiscal year. Maintenance: 
Operations included condition and operation 
studies by hired labor; and bank protection, Yuba 
River, various locations upstream from Marysville 
completed by contract, $2,218. 
Historical summary. Construction of project works 
was initiated in November 1902. Construction of 
Daguerre Point Dam was completed in May 1906; 
diversion of river over dam was completed in 1910; 
training walls and dikes were completed in 1935. About 
149 million cubic yards of debris are held in lower 7 
miles of Yuba River between Marysville and downstream 
end of training walls. About 20 million cubic 
yards are confined in river channel by Daguerre Point 
Dam. Additional millions of yards of loose material are 
in mine tailing fields adjacent to project training walls 
in upper 7-mile reach of project. Initial rehabilitation of 
Daguerre Point Dam begun in July 1963 was completed 
in December 1964. Contract for permanent rehabilitation 
of structure was initiated in July and completed in 
October 1965. 
Flood Control 
4. SACRAMENTO RIVER, CA 
Location. Works covered by this improvement are on 
Sacramento River and tributaries in north-central 
California from Collinsville to Ordbend, a distance of 
184 miles. 
Previous project. For details see page 1815 of 
Annual Report for 1917, page 1995 of Annual Report for 
1938, and page 2262 of Annual Report for 1907. 
Existing project. Sacramento River flood control 
project is a comprehensive plan of flood control for 
Sacramento River and lower reaches of its principal 
tributaries. Improvement extends along Sacramento 
River from Ordbend in Glenn County, CA, 184 miles 
downstream to its mouth at Collinsville at upper end of 
Suisun Bay, and comprises a system of levees, overflow 
weirs, drainage pumping plants, and flood bypass 
channels or floodways designed to carry surplus floodwaters 
without inundation of valley lands. About 980 
miles of levee construction, with an average height of 15 
feet and 98 miles of bank protection are involved in 
project. For further details, see Annual Report for 1962, 
page 2115. (See table 44-B for authorizing legislation.) 
Estimated (October 1987) cost for original project 
(exclusive of supplemental levee improvements), including 
new work and maintenance, is $163,925,000 of 
which $68,925,000 is Federal cost and $95 million non- 
Federal ($90,050,562 for lands and damages and 
relocations and $4,949,438 required contributed funds 
for levee construction, bank protection works, and levee 
setbacks). Of this amount, $4,939,752 was for new work 
and $9,686 for maintenance. Estimated October 1987 
cost for the 2.4 miles of remedial levee work, Yolo 
Bypass and Cache Slough (Unit 109) is $7,475,000, of 
which $5,875,000 is Federal and $1,600,000 is non- 
Federal for lands, easements and rights-of-way, for a 
total project cost of $171,400,000. In addition to project 
requirements, local interests constructed several pumping 
plants for drainage of agricultural and urban land 
protected by project levees. Some channel clearing 
work was accomplished by State of California and other 
local interests to supplement project levee construction. 
Dredging below Cache Slough and reconstruction of 
Cache Creek settling basin weir are considered deferred 
and excluded from foregoing cost estimate. Estimated 
cost (July 1962) of these project units is $2,560,000 and 
$520,000, respectively, a total of $3,080,000 plus U.S. 
costs, for construction. Operation and maintenance of 
completed project will be responsibility of local interests; 
as units of project are completed, they are transferred to 
agencies of State of California for operation and 
maintenance. Existing project was adopted by 1917 
Flood Control Act (H. Doc 81, 62d Cong., 1st sess., as 
modified by Rivers and Harbors Committee Doc. 5, 63d 
Cong., 1st sess.), 1928 Flood Control Act (S. Doc. 23, 
69th Cong., 1st sess.), River and Harbor Act of 1937 (S. 
Committee print 75th Cong., 1st sess.), and 1941 Flood 
Control Act (H. Doc. 205, 77th Cong., 1st sess.). 
Local cooperation. Local interests have fully complied 
with requirements for all work completed and 
indicated they will be able to fulfill requirements for 
remaining work. Local interest costs from required 
contributed funds for project work total $4,949,438 for 
levee construction, bank protection works, and levee 
setbacks, of which $4,939,752 was for new work and 
$9,686 for maintenance. 
Operations and results during fiscal year. Regular 
funds: Engineering continued. 
Historical summary. Construction of existing project 
began in FY 1918 and is about 99 percent complete. 
Channel improvement to date has produced a channel 
with a capacity of 579,000 cubic feet per second in 
Sacramento River below Cache Slough. In addition, 
discharges up to 21,000 cubic feet per second can be 
diverted from Sacramento River through Georgiana 
Slough. Completed major project items include about 
977 miles of levees; five weirs with a combined discharge 
capacity of 602,000 cubic feet per second; two cutoff 
channels; two sets of outfall gates; channel improvement 
44-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
and clearing in Sacramento River, Butte Creek, Putah 
Creek, and Sutter and Tisdale Bypasses; construction of 
two main bypasses or floodways and secondary bypasses 
at Tisdale and Sacramento weirs and at Wadsworth 
Canal; construction of Knights Landing ridge cut and of 
Cache Creek settling basin; installation of gaging stations; 
and enlargement of Sacramento River below 
Cache Slough. Cutoffs at Collins Eddy and between 
Wild Irishman and Kinneys Bends were made in 1918 
and 1919, respectively. Sacramento weir was completed 
in 1917, Fremont weir in 1924, Tisdale and Moulton 
weirs in 1932, and Colusa weir in 1933. Outfall gates at 
Knights Landing were constructed in 1930 and at 
mouth of Butte Slough in 1936. Pumping plants on 
Sutter Bypass were completed in 1944. Work items 
with reference to clearing, snagging, rectification of 
channels, and bank protection on Sacramento River 
and tributaries in Tehama County and from Red Bluff 
southerly, provided for by 1941 Flood Control Act were 
accomplished in fiscal years 1947,1948,1949, and 1951. 
Work remaining comprises completion of levee stage 
construction, Yolo Bypass and Cache Slough (Unit 109). 
(See table 44-C for total cost of existing project to 
September 30, 1987.) 
44-4

TABLE 44-A 
See 
Section 
i 
CALIFORNIA DEBRIS COMMISSION 
COST AND FINANCIAL STATEMENT 
Total Cost to 
Funding FY 84 FY 85 FY 86 FY 87 Sep 30, 1987 
Maint. 
n Text Project 
1. Regulation of 
Hydraulic Mining 
and Preparation of 
Plans 
2. Sacramento River and 
Tributaries, CA 
(Debris Control) 
Contributed Funds, 
her) 
3. Treatment of Yuba 
River Debris 
Situation Restraining 
Barriers, CA 
(Federal Funds) 
Required Contributed 
unds) 
Contributed Funds, 
Other) 
4. Sacramento River, 
CA 
(Federal Funds) 
(Contributed Funds) 
554,000 702,000 695,000 63 
653,198 695,102 690,522 59 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
MaAinptp.rop. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
Rehab. 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
24,000 
10,066 
14,000 
11,282 
24,000 3' 
44,177 1 
26,500 3 
41,476 1 
300,000 201,500 24 
274,092 165,245 15 
821,325 
821,325 
- 5,093,999' 2 
- 5,093,9991 3 
3,000 7,795,0434 
3,316 7,703,3045 
- 12,4206 
- 12,4206 
- 361,482 
- 361,482 
7,000 1,707,6567 
5,778 1,678,8257 
- 1,053,904 
- 1,053,904 
- 361,777 
- 361,777 
6,865 1,697,588 
4,901 1,671,801 
- 1,053,904 
- 1,053,904 
- 34,0008 
- 34,0006 
8,000 68,375,8359 
9,929 68,225,6019 
- 1,979,104 
- 1,979,104 
- 10,724,08510 
- 10,724,08510 
S9,68611 
9,68611 
1. Exclusive of $644,503 appropriation and cost on inactive 
portion of project. 
2. Includes $447,127 for recreational facilities at North 
Fork ($32,473) and Harry L. Englebright ($414,654), Code 
710 appropriations. 
3. Includes $447,127 for recreational facilities at North 
Fork ($32,473) and Harry L. Englebright ($414,654), Code 
710 costs. 
4. Includes $6,618,962 from regular funds and $1,176,082 
from Hydraulic Mining in California funds. 
5. Includes $6,527,222 from regular costs and $1,176,082 
from Hydraulic Mining in California costs. 
6. Funds from State of California Department of Navigation 
and Ocean Development for acquisition of a boarding 
float at Englebright Dam. 
7. Includes deferred maintenance funds in amount of 
$207,500. 
8. Miscellaneous engineering and construction accomplished 
at expense of local interests in connection with 
rehabilitation of Daguerre Point Dam necessitated by 
December 1964 floodflows. 
9. Includes appropriation and cost of $680,000 for new 
work for previous project and $1,486,469 public works funds 
for new work for existing project. 
10. Includes $680,000 required contribution for previous 
project; $4,939,752 required contributed funds for existing 
project; and $310,801 voluntary contribution for bank protection 
for existing project. 
11. Includes $9,686 required contributed funds for existing 
project. 
44-5 
25,000 
22,435 
15,000 
19,436

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 44-B AUTHORIZING LEGISLATION 
See Date 
Section in Authorizing 
Text Act Project and Work Authorized Documents 
Mar. 1, 1893 
Feb. 27, 1907 
June 19, 1934 
June 25, 1938 
Nov. 17, 1986 
Dec. 22, 1944 
and May 17, 1950 
July 3, 1958 
July 14, 1960 
REGULATION OF HYDRAULIC MINING AND 
PREPARATION OF PLANS 
Created California Debris Commission and authorized: (a) Ex. Doc. 267, 51st Cong., 
Hydraulic mining under its regulation in drainage areas of 2d sess., Ex. Doc. 98, 
Sacramento and San Joaquin Rivers, if possible without 47th Cong., 1st sess.' 
injury to navigability of these river systems or to lands 
adjacent thereto; and (b) preparation of plans by 
Commission for improvement of navigability of these river 
systems, and flood and debris-control therein. 
Authorized California Debris Commission to permit (Amendment of sec. 13, 
hydraulic mining without construction of impounding Act of Mar. 1, 1893.) 1 
works, provided there is no injury to navigability of above 
river systems or lands adjacent thereto. 
Amended act of Mar. 1, 1893, which provides for construction 
of debris dams or other restraining works by California 
Debris Commission and collection of a 3-percent tax on 
gross proceeds of each mine using such facilities, 
so as to eliminate this tax and substitute an annual tax 
per cubic yard mined, obtained by dividing total capital cost 
of each dam, reservoir, and rights-of-way, by total capacity 
of reservoir for restraint of debris; and authorized 
revocation of Commission orders permitting such mining, 
for failure to pay this annual tax within 30 days after its due 
date; and also authorized receipt of money advances, from 
mineowners to aid such construction, to be refunded later 
from annual payments of yardage taxes on material mined. 
Added at end of sec. 23 of above act, a provision that the 
Secretary of the Army is authorized to enter into contracts 
to supply storage for water and use of outlet facilities 
from debris-storage reservoirs for domestic and irrigation 
purposes and power development, upon such conditions of 
delivery, use, and payment as he may approve, these 
payments are to be deposited to credit of such reservoir 
project, reducing its capital cost to be repaid by tax 
on mining operations. 
Abolished the California Debris Commission and trans- Sec. 1001, 1986 WRDA 
ferred all authorities, powers, functions, and duties to the 
Secretary of the Army. Authorized all acquired land and 
other interests presently under jurisdiction of the 
Commission to be retained and administered under 
direction of the Secretary. 
SACRAMENTO RIVER, CA 
Additional levee construction and reconstruction, including H. Docs. 649. 78th Cong., 
levee protection of Upper Butte Basin, and multipurpose 2d sess., and 367, 81st 
reservoirs.2 Cong., 1st sess. 
Bank protection and incidental channel improvements, H. Doc. 272, 84th Cong., 
Sacramento River from Chico Landing to Red Bluff, and 2d sess. 
local interests flood plain zoning above Chico Landing.2 
Bank protection works at critical locations, Sacramento S. Doc. 103, 86th Cong., 
River.2 2d sess. 
44-6 
4.
1. For latest published map, see Annual Report for 1913, 2. This supplemental work is reported in detail under 
p. 3170, and Rivers and Harbors Committee Document 50, Sacramento District, Improvement No. 21. 
74th Cong., 1st sess.

CALIFORNIA DEBRIS COMMISSION 
TABLE 44-C SACRAMENTO RIVER, CA: TOTAL COST OF 
EXISTING PROJECT TO SEPTEMBER 30, 1987 
(See Section 4 of Text) 
Funds New Work Maintenance Total 
Regular $66,059,132 $1,979,104 $68,038,2361 
Public Works 1,486,469 1,486,469 
Total U.S. $67,545,601 $1,979,104 $69,524,705 
Contributed Project Work 4,939,752 9,686 4,949,438 
Contributed, Other 5,104,333 5,104,333 
Total All Funds $77,589,686 $1,988,790 $79,578,476 
1. Includes $429,671 representing book value of plant 
purchased with previous project funds and transferred to 
existing project without reimbursement. 
44-7

U.S. ARMY ENGINEER WATERWAYS 
EXPERIMENT STATION 
Organization and functions. The Waterways Experiment 
Station (WES) is a field operating agency of the 
Chief of Engineers operating under the staff supervision 
of the Director, Research and Development. COL 
Dwayne G. Lee, Corps of Engineers, is Commander 
and Director. Dr. Robert W. Whalin, PE, is Technical 
Director. Dr. Dennis R. Smith is Assistant Technical 
Director. 
WES, the Corps of Engineers largest laboratory 
complex for research, testing, and development, consists 
of six technical laboratories: Hydraulics, 
Geotechnical, Structures, Environmental, Coastal 
Engineering Research Center, and Information 
Technology Laboratory. The Hydraulics Laboratory, 
the largest laboratory of its kind in the world, uses a 
wide range of working models and computer-based 
numerical models for research and analysis of dams, 
levees, river and harbor projects, soil and streambank 
erosion, thermal pollution, etc. The Geotechnical 
Laboratory conducts research in soil mechanics, 
structural foundation design, embankment design and 
slope stability, seepage analysis, military pavements, 
engineering geology, rock mechanics, expedient surfacing, 
earthquake engineering, and mobility and 
trafficability. The Structures Laboratory uses theoretical, 
analytical, experimental, and modeling 
approaches to research the effects of nuclear and nonnuclear 
explosions, the response of structures to natural 
and explosive disturbances, and various construction 
materials with emphasis on concrete, especially the 
testing, repair, and preservation of existing concrete 
structures. The Environmental Laboratory researches 
the problems caused by man's activities with respect to 
the environment. Research programs include Dredged 
Material, Aquatic Plant Control, Environmental and 
Water Quality Operational Studies, Environmental 
Impact, Wetlands, and the Natural Resources Research 
Program. These and other programs of the Environmental 
Laboratory range through waste management, 
environmental regulations, and military aspects of terrain 
and camouflage. The Coastal Engineering 
Research Center conceives, plans, and conducts 
research and data collection in coastal/ocean engineering 
and nearshore oceanography to: provide a 
better understanding of waves, winds, water levels, 
tides, and currents; and provide scientific and engineering 
data and design criteria for materials as they 
apply to navigation improvements, flood storm protection, 
beach erosion control, recreation, and protection 
of structures in the coastal zone. The Information 
Technology Laboratory is responsible for all communications, 
mainframe computer functions for both technical 
and administrative applications, graphic presentations, 
and printed media at the station. 
WES Laboratories are engaged in research and engineering 
investigations in support of the civil and 
military missions of the Chief of Engineers. On a 
reimbursable basis, WES performs basic and applied 
research, develops state-of-the-art methods and techniques, 
tests materials and equipment, and provides 
consulting services. Subject to the approval of the Chief 
of Engineers, studies and investigations may be undertaken 
for agencies outside the Department of the Army. 
WES maintains an extensive scientific and engineering 
reference library to serve the specialized 
needs of the Corps of Engineers and issues publications 
of general interest; operates DoD Information Analysis 
Centers in the fields of Pavements and Soils Trafficability, 
Concrete Technology, Hydraulic Engineering, 
Soils Mechanics, and Coastal Engineering; and maintains 
the Corps of Engineers Engineering Computer 
Programs Library. 
During Fiscal Year 1987, 396 WES numbered 
reports of individual studies conducted at or for WES, 
14 information reports, 25 information exchange bulletins, 
9 video reports, 14 technical manuals, and 10 
various special purpose technical documents (conference 
reports, special study reports, etc.) for WES and 
other offices were printed and distributed to Corps 
offices and interested outside agencies. 
Operations and results during the period. Work 
accomplished at WES is, in general, initially financed 
by the Corps of Engineers Revolving Fund, with direct 
reimbursement from agencies requesting research 
investigations and related services. The Station's total 
program during Fiscal Year 1987 was $122,745,579 
which included $32,429,900 performed by contract. Of 
the total program $62,276,678 was oriented toward the 
civil sector and $60,468,901 to military. The plant 
replacement and improvement program was $6,096,700 
for this period. 
45-1

PERMANENT INTERNATIONAL ASSOCIATION OF NAVIGATION CONGRESSES 
(PIANC) 
The Permanent International Association of Navigation 
Congresses (PIANC) is an international organization 
with headquarters in Brussels, Belgium. It is a clearing 
house where engineers and port operators of the nations 
of the world exchange views and experiences on problems 
relating to ocean and inland navigation improvements. 
Its objective is broadly stated "to promote the progress 
of inland and maritime navigation". 
In 1902, the United States began an annual appropriation 
for the support and maintenance of the Permanent 
International Commission of Congresses for Navigation 
and for payment of the actual expenses of properly accredited 
national delegates of the United States to 
meetings of the Congresses and Commissions. As a 
member nation to the Association, the U.S. Section pays 
an annual subvention of about $6,900 to the International 
Secretariat in Brussels, Belgium. 
The objective of the Association - to promote the progress 
of inland and maritime navigation - is met by 
holding International Congresses and publishing 
technical bulletins and other documents. The Congresses 
are held in various member countries, usually at fouryear 
intervals. The Association is supported principally 
by member governments, but membership also extends 
to corporations and to individuals. Member governments 
are represented at the Congresses and at meetings of the 
Permanent International Commission by delegates, the 
number of official delegates to be determined by the 
amount of the annual subvention paid by the government, 
but not to exceed ten in number. Corproate 
members may send one official representative to the Congresses. 
Currently, the Permanent International Commission 
has 39 countries represented. Individual 
membership is of two classes - Annual and Life - depending 
on the method of payment of dues. There are 1,495 
annual international members, 552 life members, and 
692 corporate members, for a total of 2,739 members. 
Membership of the U.S. Section on June 1, 1987 totaled 
642, consisting of 106 life members, 438 individual 
members and 98 corporate members. 
The affairs of the Association are managed by the Permanent 
International Commission composed of delegates 
from the supporting governments. The National Commission 
constitutes the governing body of the U.S. Section 
and the U.S. Members of the Permanent International 
Commission. The Director of Civil Works, Office of the 
Chief of Engineers, US Army, and the Commander and 
Director, Water Resources Support Center, are the exofficio 
Chairman and Secretary, respectively, of the National 
Commission. The Secretary handles all administrative 
matters of the U.S. Section. 
During Fiscal Year 1987, National commissioners 
were: Major General Henry J. Hatch, Director of Civil 
Works, USACE, ex-officio Chairman; Colonel George R. 
Kleb, Commander and Director, Water Resources Support 
Center, ex-officio Secretary; Rear Admiral John Paul 
Jones, USN; Mr. John Pisani, MARAD; Mr. Jack E. 
Ravan, EPA; Dr. G. Edward Dickey, HQUSACE (confirmation 
pending); Mr. J. Ron Brinson, Port of New 
Orleans; Mr. John A. Downs, National Association of 
Dredging Contractors; Mr. James M. Goldston, Goldston 
Corporation; and Mr. Charles R. Roberts, Port of 
Oakland. One position on the U.S. Section National Commission 
was vacant. 
At the 1987 annual meeting of the PIC Lieutenant 
General E. R. Heiberg I, Chief of Engineers, was elected 
Honorary Vice President of PIANC, having served two 
terms as an International Vice President. Lieutenant 
Genral John W. Morris, USA (Ret) is also an Honorary 
Vice President of PIANC. Major General Charles G. 
Holle, USA (Ret), Secretary-General, XXth International 
Navigation Congress, 1961, is an ex-officio member of the 
Permanent International Commission. 
The annual meeting of Permanent International Commission 
(PIC) was hosted by the Moroccan Section in 
Agadir, Morocco, on June 9, 1987, and was attended by 
all National Commissioners, except J. Ron Brinson, Mr. 
Charles R. Roberts and Dr. G. Edward Dickey. Messrs. 
Herbert Haar, Charles Conners and Harry Cook filled 
in for members of the Commission who were unable to 
attend. Lieutenant General E. R. Heiberg III, Chief of 
Engineers and PIANC International Vice-President, and 
Lieutenant General John W. Morris, USA (Ret) also attended 
the PIC meeting. 
American representatives attended meetings of the International 
Study Commission, two Permanent Technical 
Committees (PTCs) and Working Groups of PTCs. U.S. 
representation on these groups during this fiscal year was 
as follows: 
International Commission for Study of Locks, Ship 
Lifts, and River Weirs - Dr. Michael Yachnis, USN. The 
Commission has published the portion of the study dealing 
with locks and continues working on the sections 
devoted to ship litts. Dr. Yachnis replaces Mr. John 
Davis, who resigned after having served as the U.S. 
Representative to the Locks Commission for 13 years. 
Permanent Committee for Developing Countries - Mr. 
Jack Ravan, EPA 
Permanent Technical Committee I - Major General 
Robert Seedlock, USA (Ret) 
Working Group 1, Economic Implications of Inland 
Waterways - Mr. Howard E. Olson 
Working Group 2, Disposal and Land Dumping of 
Dredged Materials: Impact on the Environment - Mr. 
Paul Sorensen 
Working Group 3, Consideration of Risk in Determining 
Bank Protection - Mr. Alan D. Crowhurst 
Working Group 4, Use of Geotextiles for Inland Waterways 
Bank Protection - Mr. Max Lamb 
Working Group 5, Container Transport with Inland 
Vessels - Mr. Morris A. Clyde 
Working Group 6, Problems Created by Salt Water Intrusion 
in Inland Navigation Canals and Rivers - Ms. 
Christina Correals 
Working Group 7, Economic and Statutory Aspects of 
Management of Materials Dredged from Inland Waterways 
- Mr. Charles Hummer 
Working Group 8, Hydraulic Consequences of the 
Automatic Functioning of Wiers - Mr. Jack Niemi 
Working Group 9, Standardization of Inland Waterway 
Dimensions - Mr. Anatoly Hochstein 
46-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Working Group 10, Control and Monitoring of the 
Stability of Long Lateral Dykes - Vacant 
Working Group 11, Analysis of the Cost of Water 
Transport and of the Cost of Terminal Fees - Mr. 
Howard Olson 
Working Group 12, Bank Protection Using Natural 
Materials - Mr. Max Lamb 
Permanent Technical Committee II- Mr. Eugene H. 
Harlow 
Working Group 1, Navigation in Muddy Waters - Mr. 
John B. Herbich 
Working Group 2, Stability of Rubble Mount 
Breakwaters in Deeper Water - Mr. Eugene Harlow 
Working Group 3, Ice Navigation - C. Allen Wortley 
Working Group 4, Handling of Dangerous Goods in 
Ports - Captain William R. Reidel 
Working Gropu 5, Underkeel Clearance, Hard Bottom/
Sea Conditions - Mr. Ronald Uhlin 
Working Group 6, Classification of Soils and Rocks to 
be Dredged - Mr. James W. Bean 
Working Group 7, Dimensions and Lay-out of Channels, 
Including two-way Channels - Mr. Leonard Van 
Houten' 
Working Gorup 8, Damage Inflicted by Ships With 
Bulbous Bows on Underwater STructures - Mr. Wesley 
Allen 
Working Group 9, Development of Modern Marine Terminals 
- Mr. Charles Roberts 
Working Group 10, Disposal of Dredged Materials into 
the Sea - Colonel Herbert Haar, USA (Ret) 
Working Gorup 11, Consequences of New 
Developments of Car/Passenger Ferries - US not 
participating 
Working Group 12, The Performance and Design 
Parameters of Rubble Mound Breakwaters - Dr. Robert 
Whalin 
Working Group 13, Floating Breakwaters - Mr. John 
Oliver 
Working Group 14, Economical Channel Maintenance 
Methods - Mr. James W. Bean 
Working Gropu 15, Graving Docks - Dr. Michael 
Yachnis 
Working Group 16, Specifications of Loading Transportation 
and High Temperature Destruction of Toxic and 
Chemical Wastes at Sea - Mr. Patrick Tobin 
Working Group 17, Inspection, Maintenance and 
Repair of Maritime Structures in Salt Waters Exposed 
to Material Degradation - Mr. Charles Connors 
Working Group 18, Planning of Fishing Ports - Vacant 
Working Group 19, Beneficial Uses of Dredged Material 
- Mr. Jesse Pfeiffer 
Working Group 20, Capacity Simulation Models for Approach 
Channels - Mr. John Pisani 
Working Group 21, Flexible Revetments in the Marine 
Environmental - Mr. Gene Chatham 
Joint Subcommittee on Sport and Pleasure Navigation 
- Mr. John Nichol 
Working Group 1, Ecological conservation in Relation 
to Sport and Pleasure Navigation - Mr. Neil Ross 
Working Group 2, Waves in Yacht Harbors & Marinas 
- Mr. Orson Smith 
Working Group 3, Provision of Navigation Aids for 
Sport & Pleasure Craft - Mr. Austin E. Brant, Jr. 
Working Group 4, Chartering Services - Their Growth 
and Impact on Sport & Pleasure Navigation - Mr. Ted 
Schad 
Working Group 5, Standards for Construction, Equipment 
and Operation of Yacht Harbors and Marinas - 
Mr. William A. Jansen 
U.S. Section regional meetings were held on 5-6 March 
in Mobile, Alabama, by the Eastern Region; 9-10 July 
in Buffalo, New York by the Central Region (the first 
joint meeting of the U.S. and Canadian Sections); and 8-9 
October in Los Angeles, California, by the Western 
Region. 
During 1987, the U.S. Section also held concurrent 
meetings and the PIANC exhibit was displayed at 
meetings with the Western Dredging Association, 
American Association of Port Authorities, and National 
Waterways Conference. 
46-2

INVESTIGATION OF PROJECTS UNDER FEDERAL POWER ACT 
a. The Federal Water Power Act of June 10, 1920, 
created the Federal Power Commission (in 1977 renamed 
the Federal Energy Regulatory Commission, FERC) composed 
of the Secretaries of War, Interior, and Agriculture, 
with authority to grant permits and licenses for 
hydroelectric development in all water over which Congress 
has jurisdication. The act further required that 
work of the commission be performed by and through the 
Departments of War, Interior and Agriculture and their 
engineering, technical, and other personnel except as may 
be otherwise provided by law. By an act of June 23, 1930, 
entitled "An Act to Reorganize the Federal Power Commission," 
Secs. 1 and 2 of the Federal Water Power Act 
of 1920 were amended. A commission was provided for, 
to be composed of five commissioners to be appointed by 
the President, by and with the advice and consent of the 
Senate. The necessity of performing work through the 
Department of War, Interior and Agriculture was removed 
and the commission was authorized to appoint 
such officers and employees as necessary in executing its 
function. By Title II, Public Utility Act of 1935, the 
original Federal Water Power Act was made Part I of the 
Federal Power Act, and Parts II and I were added to 
that Act. On October 1, 1977, pursuant to the provisions 
of the Department of Energy Organization Act (DOE Act), 
Public Law 59-91 Stat. (August 4, 1977) and Executive 
Order No. 12009, 42 Fed. Reg. 46267 (September 15, 
1977), the Federal Power Commission ceased to exist and 
its functions and regulatory responsibilities were 
transferred to the Secretary of Energy and the Federal 
Energy Regulatory Commission (FERC) which, as an independent 
commission within the Department of Energy 
was activated on OctOber 1, 1977. 
b. Section 4(e) of the Federal Power Act provides that 
no water power license affecting navigable capacity of 
any navigable waters of the United States shall be issued 
until plans of the dam or other structures affecting 
navigation have been approved by the Chief of Engineers 
and the Secretary of the Army. By an action, notice of 
which was published in the Federal Register Volume 40, 
Number 74, dated April 16, 1975, the Secretary of the 
Army delegated to the Chief of Engineers his authority 
under Sec. 4(e) of the Federal Power Act. The Chief of 
Engineers on 5 September 1980 delegated to the Corps 
division engineers the authority for Section 4(e) approval 
of plans for non-Federal hydropower development affecting 
navigation. 
c. The following work of an engineering nature was accomplished 
by the Corps division and district offices 
under the direction of the Chief of Engineers during the 
fiscal year: (1) 581 applications from non-Federal entities 
for planning, design, construction and operation of 
hydropower projects were reviewed and appropriate 
recommendations in the interest of flood control, navigation, 
and structural safety, and environmental impacts, 
relative to Corps projects, were furnished to the FERC. 
(2) 73 licensed power plants were in various stages of 
design review for addition of power at Corps dams, and 
(3) 17 Corps approved non-Federal power plants were in 
active construction stages by the end of the fiscal year. 
d. The Corps bills FERC licensees for the costs incurred 
by the Corps for reviewing and approving final 
design, plans and specifications for construction of power 
plants at Corps projects. In FY 1987, the total cost reimbursement 
to the Corps for this service was $1,269,045. 
Review of license applications is funded by the Corps as 
a line item in the General Investigation Account, in FY 
1987, the cost of this activity was $657,534. This cost was 
reported to FERC for the Commission's assessment of annual 
charges to licensees. 
47-1

REGULATORY SUNKEN VESSEL REMOVAL & 
NATIONAL EMERdENCY PREPAREDNESS ACTIVITIES 
1. Regulatory Activities 
Authorities. The following authorities charge the 
Corps of Engineers with the regulation of various waterrelated 
construction activities: Sections 9 and 10 of the 
River and Harbor Act of 1899 (structures in an alteration 
of waterways, e.g. boat docks); Section 103 of the 
Marine Protection Sanctuaries Act of 1972 (ocean dumping); 
and Section 404 of the Clean Water Act (discharge 
of dredged and fill material). 
Work Completed. During FY 1986, the Corps received 
approximately 14,400 applications for permits and 
issued about 7,000 permits and 2,700 letters of permission. 
In addition about 20,000 activities were authorized 
by regional or statewide permits which did not require 
individual applications from the public. More than 50,000 
of other minor activities were authorized by the Corps' 
nationwide permits. 
In FY 1987 the Corps continued its efforts toward 
regulatory reform based on a May 7, 1982, directive from 
the President's Task Force on Regulatory Relief. On 
November 13, 1986, the Corps published final consolidated 
permit regulations that had been under development 
for several years. 
TABLE 48-A 
GENERAL REGULATORY FUNCTIONS 
Obligations 
Unobligated Balance-30 Sep 86 ...... $ 725,371 
Allotments ...................... . 55,113,900 
Total Funds Available ............... 55,839,271 
Obligations ........................ 55,375,104 
Unobligated Balance-30 Sep 87 ...... $ 464,167 
Expenditures 
Unexpended Balance-30 Sep 86 ...... 1,990,062 
Allotments ....................... 55,113,900 
Total Funds Available............... 57,103,962 
Expenditures...................... 56,082,866 
Unexpended Balance-30 Sep 87 ...... $ 1,021,096 
2. Investigation and Removal of Sunken Vessels 
Under the authority of Sections 19 and 20 of the River 
and Harbor Act of 1899, the Corps of Engineers investigated 
sunken vessels in navigable waters and removed 
those obstructing navigation. For obligations expenditures, 
see Table 48-B. 
3. National Emergency Preparedness Activities 
Authority. Executive Order 11490, as amended, 
assigns responsibilities to executive departments and 
agencies to undertake national emergency planning and 
preparedness to develop an effective national capability 
to meet essential civilian and defense needs during major 
domestic emergencies and national security 
emergencies. 
Status: During Fy 1987, the Corps of Engineers continued 
its efforts to improve its readiness posture and 
ability to respond to various national emergencies. Emphasis 
was placed on the initiation of program activities 
that require a long-term commitment of resources. These 
activities included the institution of the Mobilization 
Command Readiness Program to address mobilization requirements 
and resources; the Corps of Engineers 
Readiness Evaluation System; maintenance of, planning 
for and development of emergency facilities to support 
continuity of operations: and, planning to meet the nation's 
water resources requirements during a national 
emergency. In the latter case, Executive Order 11490 has 
tasked the Corps of Engineers to be the Executive Agency 
responsible for emergency water planning. 
Significant strides were made in the development of 
preparedness guidance and execution plans at all levels. 
While the efforts undertaken identified additional shortfalls 
or problems to be addressed, the Corps program continues 
to move towards the goal of ensuring a national 
engineering and construction capability that can respond 
to any national emergency. For fiscal year obligations 
and expenditures see Table 48-C. 
TABLE 48-B 
REMOVAL OF SUNKEN VESSELS 
Obligations 
Unobligated Balance-30 Sep 85 ...... $ 5,398 
Allotments ........................ 2,319,391 
Total Funds Available ............. 2,324,789 
Obligations ...................... 2,322,270 
Unobligated Balance-30 Sep 86 ...... $ 
Expenditures 
Unexpended Balance-30 Sep 86 ...... 
Allotments ...................... 
Total Funds Available ............... 
Expenditures ....................... 
2,519 
5,398 
2,319,391 
2,324,789 
2,246,270 
Unexpended Balance-30 Sep 86 ...... $ 78,519 
*The institution of the Mobilization Command 
Readiness Program to address 
**The Corps of Engineers Readiness Evaluation System; 
48-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
TABLE 48-C 
NATIONAL EMERGENCY PREPAREDNESS 
Obligations 
Unobligated Balance-30 Sep 86 ...... $ 856,769 
Allotments ........................ 7,760,250 
Total Funds Available ............... .8,617,019 
Obligations ........................ 7,711,833 
Expenditures 
Unexpended Balance-30 Sep 86 ...... 
Allotments ........................ 
Total Funds Available ............... 
Expenditures....................... 
Unobligated Balance-30 Sep 87 ........ $ 905,186 Unexpended Balance-30 Sep 87 ........ $ 1,562,661 
48-2 
1,613,054 
7,760,250 
9,374,104 
7,811,443

INTERNATIONAL BOUNDARY WATERS BOARDS 
In order to carry out United States obligations under 
international agreements, the Office of the Chief of 
Engineers and several Corps Divisions and Districts with 
jurisdiction over areas bordering Canada have representation 
on numerous international boards, committees, 
and other groups. The majority of these boards were 
established by the International Joint Commission (IJC) 
as empowered in accordance with the provisions of the 
Boundary Waters Treaty of 1909 between the United 
States and Great Britain (for Canada). IJC boards fall into 
two broad categories: boards of control, which are more 
or less permanent and supervise compliance over an IJC 
order; and engineering or technical boards, which are 
usually dissolved after completing and reporting on an 
investigation assignment. In addition to boards created 
by the Commission, other international boards and committees 
are created by treaties or other informal arrangement 
in matters concerned with the water resources of 
joint interest, and the members report directly to the 
Governments or establishing agency. International boundary 
waters boards and committees having Corps of 
Engineer memberships during the fiscal year are listed 
in Table 49-1. For an explanation of the consitition of the 
various boards and committees, see the FY 77 and FY 
80 annual reports. An innovative study organization, 
neither a board nor a committee, was established to 
cnoduct a study of fluctuating Great Lakes levels pursuant 
to a Reference to the IJC from the Governments 
of Canada and the United States, dated August 1, 1986. 
A discussion of that study organization, which was 
established during FY 87, follows Table 49-1. 
TABLE 49-1 
IJC BOARDS OF CONTROL HAVING CE MEMBERS 
BOARD NAME 
YEAR 
ESTABLISHED UNITED STATES REPRESENTATION 
1. 
2. 
3. 
4. 
5. 
Int. Lakes Superior 
Int. St. Croix River 
Int. Lake of the Woods 
Int. Lake Champlain 
Int. Kootenay Lake 
6. Int. Rainy Lake 
7. Int. Osoyoos Lake 
8. Int. Niagara 
9. Int. St. Lawrence River 
10. Int. Skagit River 
11. Int. Souris River 
12. Int. Souris-Red Rivers 
Engineer 
13. Int. Champlain-Richelieu 
14. Int. Great Lakes Diversions 
and Consumptive 
Uses Study 
15. Int. Great Lakes Technical 
Information Network 
Board 
*Signifies U.S. Section Chairman. 
1914 
1915 
1925 
1937 
1938 
1941 
1943 
1953 
1953 
1967 
1959 
1948 
1975 
1977 
1979 
*Div. Engr., NCD 
*Div. Engr., NED 
*Dist. Engr., St. Paul 
*Dist. Engr., New York 
*1. Dist. Engr., Seattle 
2. Dept. of Interior, USGS, Boise, ID 
*Dist. Engr., St. Paul 
1. Dist. Engr., Seattle 
*2. Dept. of Interior, USGS, Tacoma, WA 
3. Washington State Parks & Recreation Commission, 
Olympia, WA 
*1. Div. Engr., NCD 
2. Dept. of Energy, fERC, Washington, D.C. 
*1. Div. Engr., NCD 
2. St. Lawrence-Eastern Ontario Commission, 
Waterton, NY 
3. NY Power Authority, Massena, NY 
*Dist. Engr., Seattle 
1. Dist. Engr., St. Paul 
*2. ND State Engr., Bismark, ND 
3. Dept. of Interior, USGS, Bismark, ND 
1. Dist. Engr., St. Paul 
*2. Dept. of Interior, BOR, Washington, D.C. 
3. Dept. of Interior, USGS, Reston, VA 
*1. New York Dept. Envir. Conser. 
2. Dist. Engr., New York 
3. Vermont Agency Envir. Conser. 
4. New England River Basins Commission, Staff Associate 
5. Dept. of Interior F&WS Boston, MS 
*1. Div. Engr., NCD 
2. Michigan Dept. Nat. Res. 
3. Illinois Dept. of Trans. 
4. Pennsylvania Dept. Of Envir. Res. 
5. Dept. of Energy, FERC, New York, NY 
*1. CENCE-ED, Detroit, MI 
2. Great Lakes Environmental Research Lab., NOAA, 
Ann Arbor, MI 
3. USGS, Reston, VA 
49-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
OTHER INTERNATIONAL BOARDS OR GROUPS HAVING CE MEMBERS 
YEAR 
BOARD NAME ESTABLISHED 
16. Int. Lake Memphremagog 
17. Coordinating Committee 
on Great Lakes Basic 
Hydraulic and Hydrologic 
Data 
18. Int. Niagara Committee 
19. Columbia River Treaty 
Entities 
20. Columbia River Treaty 
Permanent Engineering 
*Signifies U.S. Section Chairman. 
1920 
1953 
1955 
1964 
1964 
Study of Fluctuating Great Lakes Levels Under the 
August 1, 1986, Reference 
On August 1, 1986, the Government of Canada and the 
United States issued a reference to the IJC to study 
methods to alleviate the adverse consequences of fluctuating 
water levels in the Great Lakes - St. Lawrence 
River basin. The IJC was requirested to address the immediate 
high lake level crisis and identify and evaluate 
intermediate and long-term potential measures, while 
considering such vital matters as domestic water supply 
and sanitation, navigation, agriculture, shore property, 
flood control, wildlife and others. The IJC is to determine 
the full costs and benefits of any works or measures and 
indicate how the various interests on either side of the 
boundary would be affected. Compensatory works or 
measures to offset costs to the interests which may be 
adversely affected by any proposed regulatory measures 
also must be deteremined. 
The IJC proceeded with its reference responsibilities 
on three tracks. First, it submitted an initial report to 
the federal governments on November 14, 1986, listing 
immediate actions that could be taken to lessen damages 
from the then current high water levels. Second, the IJC 
formed a taskforce to evaluate measures which could be 
implemented within approximately one year to reduce 
high lake levels. The third track is the comprehensive 
study of long-term measures. 
The U.S. Department of State requested, by letter dated 
November 24, 1986, that the Corps of Engineers provide 
lead agency support to the IJC effort on this study. The 
IJC appointed a Steering Committee and a Project 
Management Team in April 1987. 
Study Level United S 
Governance Level All Three 
Steering Committee Lead U.S 
Project Management Team *Div. Eng 
Lead IJC 
Chairpers 
Functional Group No. 1 *Chief, C] 
Functional Group No. 2 *Wisconsi 
Functional Group No. 3 *Dr. Leor 
Functional Group No. 4 *Keith Bi 
Functional Group No. 5 *Dr. Mic 
*Signifies U.S. Co-chairman 
UNITED STATES REPRESENTATION 
*Dist. Engr., New York 
*1. Eng. Div., North Central Div. 
2. Dept. of Commerce, NOAA, Rockville, MD 
*Div. Engr., NCD 
1. Div. Engr., NPD 
*2. Bonneville Power Admin., Portland, OR 
*1. OCE, CEEC-Z, Washington, D.C. 
*2. Dept. of Energy, Washington, D.C. 
In the study for evaluating the long-term solutions to 
the problem of fluctuating lake levels, four distinct levels 
of study management are emobdied in four different 
groups. They are made up of representatives from the IJC 
and Federal and state agencies, as well as individuals 
from universities and private sector enterprises. 
* Governance level - the six IJC Commissioners. 
* Steering Committee level - two lead IJC Commissioners 
and their lead staff and the two co-chairs of the 
Project Management Team. 
* Project Management Team level - the United States 
and Canadian co-chairs and the chairpersons of all the 
functional study groups, following. 
* Functional study groups level - there are five functional 
study groups: 
Group No. 1. Hydraulic, Hydrologic and Climate 
Group; 
Group No. 2. Coastal Zone Ecology, Resources, Uses 
and Management Group; 
Group No. 3. Socio-economic and Environmental 
Impact Assessment Group; 
Group No. 4. Public Participation and Communication 
Group; and 
Group No. 5. System Synthesis and Analysis Group. 
Key United States representation is presented in the 
following tabulation. In addition to the positions listed 
therein, Corps of Engineers personnel also serve as vital 
members of the various taskforce and functional work 
groups conducting different parts and different levels of 
the study. 
tates Representation 
U.S. IJC Commissioners 
SIJC Commissioner Div. Engr., Corps of Engineers 
gr., NCD 
staff 
on of the Functional Groups Listed Below 
ENCD-ED 
in DNR, Bureau of Water Resources and Zoning 
iard Shabman, Virginia Polytechnical Institute 
ulen, U.S. IJC Commissioner 
hael Ben-Eli, the Cybertec Consulting Group, Inc. 
49-2

CONSTRUCTION ENGINEERING RESEARCH LABORATORY 
The U.S. Army Construction Engineering Research 
Laboratory (CERL) at Champaign, IL, conducts research 
in vertical construction as applied to buildings and 
construction. 
During FY87, CERL conducted an extensive amount 
of laboratory corrosion protection and abrasion testing 
of metallised coatings in an immersion environment. The 
coatings included zinc, aluminum, zinc-aluminum alloy, 
aluminum bronze, as well as several stainless steels. 
Coatings were applied using both two wire arc and wire 
flame spray processes. The processes were also used to 
apply the most durable materials to the high abrasion 
area on a dam gate at Belleville, Ohio. 
USA-CERL also implemented Micro ABS Version 1.0 
at 40 Civil Works Districts which resulted in an average 
cost saving of $5,000 per district. This was due to a shift 
in workload from the district Harris computer to the 
micro-computer environment. 
USA-CERL developed an electronic application update 
distribution system to ensure that all districts were running 
the latest version of Micro ABS and could be upgraded 
in one to two hours instead of two to three days 
by normal mail. Over the course of FY87, each district 
realized an estimated savings of $1,000. The total savings 
per district for the Micro ABS work is $6,000 per 
district. 
50-1

U.S. ARMY ENGINEER TOPOGRAPHIC LABORATORIES 
Organization and functions. The U.S. Army 
Engineer Topographic Laboratories (USAETL) 
began during World War I as a temporary Engineer 
Detachment formed to test aerial photographic 
mapping. Since that time, USAETL has grown to 
become a sophisticated, modern research and 
development laboratory. The laboratories apply the 
latest advances in electronics, computer data 
processing, space sciences and related technologies 
to military and civil problems in mapping, 
surveying, land navigation and geodesy. USAETL 
is now a field operating activity of the Corps of 
Engineers commanded by Colonel Alan L. 
Laubscher. 
USAETL is the only defense research and 
development laboratory that addresses the full 
range of developments in the topographic sciences, 
from basic research to a final product. Support is 
provided to both the military and civil works 
elements of the Corps and to the Army Materiel 
Command, Army Space Program Office, Defense 
Advanced Research Projects Agency (DARPA) and 
the Defense Mapping Agency. To provide this 
support, USAETL is organized into five operational 
elements, three of which are developmental laboratories. 
The Geographic Systems Laboratory 
performs research and development associated with 
the extraction and presentation of geographic data 
for the Army in the field. The Topographic Developments 
Laboratory supports technological developments 
in surveying and mapmaking. The Space 
Programs Laboratory conducts research and 
development relating to the Army Space Program 
and acts as the Corps' executive agent for space. 
The Research Institute performs most of the 
Laboratories' basic and applied research, and the 
Terrain Analysis Center prepares terrain studies 
needed by the Army elements in the field as directed 
by the Army Assistant Chief of Staff for Intelligence. 
During FY 87, copies of 33 USAETL reports 
on individual studies conducted at or for USAETL 
were distributed to Corps offices and interested 
outside agencies. 
In recent years, the emphasis of USAETL's 
research and development program has shifted from 
conventional mapmaking and surveying equipment 
and related techniques to new topographic data 
systems. These systems are required to support the 
next generation of complex weapon systems and 
military geographic information systems required 
by field commanders for improved command, 
control, communications and intelligence. The new 
systems frequently use data acquired by remote 
sensing, and much of the work done at USAETL 
involves this technology. USAETL researchers are 
investigating the types of data derived from sensors 
and the means for exploiting that data. Studies 
showing the possibility of automating image interpretation 
are an important aspect of this work. The 
knowledge gained in these areas will apply iot only 
to the mapping and terrain analysis missions of 
USAETL, but also to the Army thrust of teleoperated 
and autonomous vehicles. Other work is 
to investigate the digital processing of remotely 
sensed data and to define remote sensing inputs 
required for Army terrain graphics and terrain data 
bases. In addition, USAETL conducts short courses 
on remote sensing for Corps of Engineers and other 
government personnel. 
Operations and results during FY 87. USAETL's 
total program for FY 87 was $94,279,900 (including 
$23,521,800 DARPA Direct Allotment funds). This 
included work done for other agencies as well as for 
the Corps of Engineers. Of this total program, 
$43,247,600 supported work performed by contract. 
Work in FY 87 included $378,300 charged to civil 
works funds. 
Civil works efforts in FY 87 focused on developing 
and demonstrating new survey techniques and 
equipment for use by districts and divisions. 
Engineers concentrated on transferring technology 
of the NAVSTAR Global Positioning System (GPS) 
to the field. This system uses signals transmitted 
by satellites to calculate extremely precise, relative, 
3-D coordinates. USAETL engineers continued 
development of an automatic dam deformation 
monitoring system based on the GPS. Other GPS 
projects were conducted to investigate the potential 
of precise positioning of Corps hydrographic survey 
vessels. Other civil work projects included work on 
a new technique for computing earthwork volumes, 
developing software for performing datum transformation 
between the old North American Datum 
of 1927 and the new North American Datum of 
1983, and the investigation of optical digital mass 
storage techniques for district application. 
51-1

U.S. ARMY COLD REGIONS RESEARCH 
AND ENGINEERING LABORATORY 
BACKGROUND 
The U.S. Army Cold Regions Research and Engineering 
Laboratory (USACRREL), located in Hanover, 
New Hampshire, was created in January 1961. It 
merged the Snow, Ice and Permafrost Research Establishment 
(created in 1949) and the Arctic Construction 
and Frost Effects Laboratory (created in 1953), both of 
which were outgrowths of the Army's World War II 
experience in Alaska, Iceland and Greenland. 
As the Army's center of expertise, USACRREL 
conducts cold regions scientific and engineering research 
solving problems encountered by the Army and 
other DOD agencies, wherever accomplishment of their 
mission is impacted by winter/cold regions effects. The 
major problem areas are: 
Ice-jam Floods 
Winter Navigation 
Remote Sensing for Civil Works 
Base Support 
Combat Operations 
Materiel Performance 
The total authorized strength of USACRREL is 293 
(277 civilian and 16 military), with a budget for FY87 
of $22 million. USACRREL has six main buildings 
in Hanover (a total of 285,322 square feet on 31 acres 
of land), including the main laboratory, the ice engineering 
facility, the logistics and supply building, the 
plant and equipment building, the equipment storage 
building and the frost effects research facility. 
The facilities include: 24 cold laboratories that can 
be operated to -50�F; an ice engineering laboratory for 
large scale ice modeling experiments; an electron microscope 
laboratory, a soils processing laboratory; a 
wastewater treatment research facility; a frost effects 
laboratory where 6-8 freeze/thaw cycles can be conducted 
in one year, trace chemicals analysis laboratories 
including a clean room complex; a small laser facility 
and a materials testing facility; an impact test research 
facility capable of simulating the space environment; 
and a snow drift modeling wind tunnel. 
USACRREL is in the final stages of modernizing 
cold room facilities in the main laboratory. When 
complete, temperatures down to -50 0F will be attainable 
in specific cold rooms. USACRREL's refrigerated 
research facilities will total 50,000 square feet, with 
840 tons of refrigeration capacity. 
USACRREL maintains a presence in Alaska at tenant 
facilities located at Ft. Wainwright in Fairbanks. 
The Alaska office provides research logistics support 
and maintains coordination with Alaska agencies. In 
addition there is an active 120 acre research site and a 
permafrost tunnel (369 feet long, excavated in permanently 
frozen ground). 
USACRREL's basic and applied research covers a 
broad spectrum of cold regions studies. Basic research 
includes work in the physical, mechanical and chemical 
properties of snow and other forms of frozen precipitation, 
freshwater ice, sea ice and frozen ground. Basic 
research supports applied research in the major cold regions 
mission areas of Ice-jam Floods, Winter Navigation, 
Remote Sensing for Civil Works, Base Support, 
Combat Operations and Materiel Performance. Major 
Civil Works cold regions research topics include Ice 
Engineering, River Ice Management, Cold Regions 
Hydrology, Remote Sensing, and Environmental Impact. 
USACRREL has an international reputation and 
maintains close ties with the international research 
community and with Federal and State agencies, where 
it provides consulting services on a reimbursable basis. 
As the cold regions scientific and engineering expert for 
the Corps of Engineers, USACRREL supports Corps 
districts and divisions by publishing field engineering 
reports, conducting demonstrations, sponsoring technical 
seminars for field engineers, making field visits to 
consult on engineering problems, and providing support 
to NORDA's polar oceanographic research group 
located on-site. 
The following members of the professional staff 
received the Army R&D Achievement Award: 
P. Sellmann, S. Arcone and A. Delaney for contributions 
in the use of geophysical systems for characterizing 
subsurface conditions in permafrost areas. 
52-1

M. Mellor, Cpt. M. Wait, D. Calkins, B. 
Coutermarsh, and D. L'Heureux for contributing techniques 
to deploy the ribbon bridge in rivers that have a 
significant ice cover. 
T. Jenkins and D. Leggett for contributions to the 
establishment of a standard analytical method for the 
determination of explosive residues in ground water. 
M. Ferrick for formulating a new theory for understanding 
river ice breakup. 
OPERATIONS AND RESULTS 
DURING FY87 
In FY87 USACRREL published and distributed 242 
scientific and engineering reports. (CRREL Reports; 
Monographs; Special Reports; Technical Notes; Technical 
Digests and information bulletins; journal articles; 
conference papers and abstracts; Corps, DA and 
other government publications; and books and nongovernment 
publications). A total of 433 Installation 
Support or One-Stop Consulting Services were provided. 
Civil Works research at USACRREL addresses the 
impacts of ice on the nation's waterways, the total hydrology 
of northern river basins, and the application of 
remote sensing technology to Corps engineering, operations, 
and planning needs. Research originating in 
the Civil Works area often has a synergistic benefit to 
the military program. A prime example of this is the 
development of a soil moisture sensor for Civil Works 
hydrology measurements that is now being applied to 
military mobility predictions. Currently our major 
civil works effort is the River Ice Management Program, 
which is demonstrating methods to improve 
winter navigation and control ice on inland waterways. 
This effort is focused on the Ohio and Upper Mississippi 
Rivers and the Illinois Waterway. A major accomplishment 
was a demonstration of the use of waste 
heat from a power plant to control ice formation on the 
Kankakee River, a tributary to the Illinois Waterway. 
USACRREL is the Corps' R&D manager for Civil 
Works applications of remote sensing technology. The 
goal of the program is to evaluate and demonstrate the 
capabilities of remote sensing technology to Corps engineering, 
operations and planning needs. As part of 
this program, USACRREL recently evaluated the applicability 
of imagery from the SPOT satellite to 
monitor dredging and dredge disposal activities. 
FY88 is the final year of the River Ice Management 
Program. This will perhaps be the first demonstration 
and technology transfer program in the Corps that has a 
complete, field-scrubbed draft engineer manual available 
at or before the end of the demonstrations. In FY89, we 
hope to initiate a new program in Ice Jam Flood Prevention, 
which is specified in the Water Resources Development 
Act of 1986. We are also evolving the con 
cept of a remote sensing assistance center to provide a 
central focus for helping the field offices exploit this 
rapidly evolving technology and to accelerate technology 
transfer of results to the field. 
ACCOMPLISHMENTS 
SPOT Satellite Evaluation 
SPOT satellite imagery was acquired for dredging 
and dredge disposal activities in Lake Erie at Toledo, 
Ohio, and Hart-Miller Island near Baltimore, Maryland. 
SPOT imagery, with its 20-meter multispectral resolution, 
promises to be a cost-effective source for remotely 
monitoring these activities. The satellite imagery 
can be used to monitor sediment transport and 
other changes in the dredging and disposal areas. A 
classification of the Toledo site was completed showing 
varying turbidity levels. This data is beneficial to 
Corps disposal efforts because it shows the relative 
impact of the disposal activity on turbidity and can be 
used to focus sampling activities. 
Ice Jam Suppression, Kankakee River 
Wilmington, Illinois experiences frequent ice jams 
on two reaches of the Kankakee River. In 1980, approximately 
$1 million in damages resulted from ice 
jam flooding, and in 1982 another ice jam incident 
caused $9 million in damages. USACRREL is studying 
this problem from the Chicago District. One of the 
jamming problems occurs on an upper reach of the 
river. The solution here appears to be a fairly straightforward 
one where a boom will be used to form a stable 
ice cover. 
On the lower reach of the river, a more unique solution 
is being evaluated this winter. During the 1986- 
87 winter, a $500 thousand project was undertaken as 
part of USACRREL's River Ice Management (RIM) 
Program to install a warm water distribution system 
from a nearby power plant cooling pond to the river. 
During the winter, the cooling pond typically has a 
temperature of at least 45�F. When the cooling pond is 
mixed with the river water, using the distribution system, 
the temperature of the river water will be raised 
approximately 0.5�F. Although this rise in temperature 
is small, it should be sufficient to prevent freeze-up in 
the areas of the river where ice jamming has been a 
problem. Actual performance of the system will be 
evaluated this winter. 
Winter Bridging 
Tactical bridging is a critical element of the Army's 
ability to preserve the freedom to maneuver and logistically 
sustain the forces. In January 1987, two operational 
techniques for deploying the lightweight ribbon 
bridge in ice-covered waters were successfully demon- 
52-2

strated on the Imjin River in Korea. The Army does 
not have doctrine or equipment for expedient winter 
bridging in ice-infested waters, although the Soviets 
consistently deploy their much heavier ribbon bridge 
under such conditions. A USACRREL experiment 
with the 2nd Engineer Battalion-Korea in 1986 represented 
the first attempt to deploy the ribbon bridge in 
an ice-clogged river. In this experiment, ice demolition 
methods were attempted to break the ice cover, and the 
resulting chunks of ice that could not be adequately 
cleared from the channel caused difficulties in assembling 
and retrieving the bridge. As a result, research efforts 
in this area were accelerated. 
A new method developed in January 1987 employed 
a combination of chain saws, explosives and bulldozers. 
Bulldozers cleared a storage site on the near shore 
while soldiers cut large sections of ice with chain saws 
and then floated the ice toward the dozers. Demolition 
methods were altered to create large sections of ice that 
were maneuvered by bridge boats. The successful techniques 
developed and tested in Korea provide the basis 
for the Army to develop doctrine for tactical winter 
bridging operations. Work will continue to develop ice 
clearing procedures for other site conditions and to assure 
that the results are incorporated in pertinent doctrinal 
and training literature. 
52-3

THE WATER RESOURCES SUPPORT CENTER 
The Water Resources Support Center (WRSC), under 
the staff supervision of the Director of Civil Works, Headquarters, 
U. S. Army Corps of Engineers, is commanded 
by Colonel Richard A. Rothblum. The Center is located 
at the Humphreys Engineer Center, Fort Belvoir, 
Virginia, with satellite elements at other locations, including 
the Hydrologic Engineering Center at Davis, 
California; and the Waterborne Commerce Statistics 
Center for the Navigation Data Center at New Orleans, 
Louisiana. The Water Resources Support Center underwent 
major internal reorganization during Fiscal Year 
1987; The Data Collection and Management Division was 
abolished, with certain of its functions transferred to 
Headquarters, USACE, and others incorporated into the 
newly established Navigation Data Center; the Permanent 
International Association of Navigation Congresses 
U.S. Secretariat functions were transferred to the Directorate 
of Civil Works; Information Management missions 
were placed in the Resource Management Office; and, the 
Dredging Division and its satellite Marine Design Center 
were placed under the direct staff supervision of the 
Directorate of Civil Works. The accomplishments of 
WRSC during FY 1987 are listed by division: 
HYDROLOGIC ENGINEERING CENTER 
The mission of the Hydrologic Engineering Center 
(HEC) is to support the Corps and the Nation in its water 
resources management responsibilities. This is accomplished 
through research, training and technical 
assistance programs in hydrologic engineering and planning 
analysis. The HEC makes every effort to be aware 
of the present needs and upcoming problems of the water 
resources community. HEC maintains continuous 
dialogue with universities, private industry, other 
Federal Agencies and state and local governments to 
keep abreast of the latest developments. 
The Center provided substantial technical assistance 
to 23 Corps offices during FY 1987, including the Office 
of the Chief of Engineers, the Waterways Experiment 
Station and the Cold Regions Research and Engineering 
Laboratory. Technical assistance was also provided to the 
Federal Highway Administration and the Federal 
Emergency Management Agency. About one-half of 
HEC's resources were devoted to direct field assistance 
projects during FY 1987. Fifteen formal training courses 
involving 11 weeks of training were conducted at HEC. 
Six workshops, totaling three and one-half weeks, were 
also held. Research funding was somewhat reduced to less 
than one-third of HEC's budget this year. 
Planning, design, construction, operation and 
maintenance of today's multiple-purpose water projects 
require complex interdisciplinary analyses. These complex 
problems present major methodological and computational 
tasks to water resources professionals. The 
HEC seeks solutions to these problems through development 
of systematic methods and use of modern 
comptuers. 
Research activities were carried out in 16 work units. 
These work units represent specific technical areas that 
have been identified in the Corps R&D program. The 
HEC's primary research area is entitled "Analytical 
Techniques in Water Resources Planning Studies." The 
HEC also participates in the Corps research programs 
in water conservation and supply, planning 
methodologies, remote sensing, and dam safety. New 
work units addressing interior flooding and risk concepts 
in flood hydrology began this year. HEC's R&D work 
units for FY 1987 are shown below. 
Improvements in Methods of Evaluating Hydrologic 
Phenomena 
Computer Methods for Water Resources Planning 
Real-Time Reservoir Regulation 
Modernization of Computer Programs 
Water Resource Data Storage System 
53-1 
Flood Forecasting for Use During Flood Emergencies 
Analytical Techniques for Evaluating Reservoir Systems 
Water Waulity Procedures for Water Control 
Management 
Flood Warning Systems 
Hydrologic Techniques for Leveed Interior Areas 
Spatial Data Management and Analysis System 
Groundwater Recharge and Storage 
Hydrologic Methods for Determining Water Supply 
Potential 
Remote Sensing and Spatial Data Applications 
Hydrologic/Hydraulic Risk Assessment of Dams 
Risk Concepts in Flood Hydrology and Damage Analysis 
Focus continued on the development of practical computer 
programs and companion user materials for use by 
field office professional staff. Areas that received particular 
emphasis this past year include: risk-cost analysis; 
dam safety; water control and flood forecasting; flood 
damage computations and data management; and water 
surface profile accuracy. 
The use of microcomputers to assist in flood control 
planning continued to receive increased attention. 
Several important HEC hydrologic engineering and flood 
damage analysis computer programs were integrated and 
released in a flood damage analysis package. 
Significant advances were make in improving HEC's 
library of computer programs during FY 1987. Fifteen 
new programs were developed this year, mostly in the 
water control and data management area. HEC programs 
were upgraded to FORTRAN77 standards to make them 
more transportable to other computers. Twenty-four HEC 
programs were added to the twenty-eight microcomputer 
versions already available in FY 1986 from HEC. These 
52 microcomputer programs cover technical areas of 
rainfall-runoff, river hydraulics, flood flow frequency, 
flood damage computations, groundwater analysis, smallscale 
hydropower cost, and spatial data management. 
Important milestones were achieved through the 
development of a MENU control system for PC operations 
and the implementation of HEC's data storage system 
on the PC. Meaningful new capabilities were developed 
for water control software and real-time reservoir 
regulation. 
During FY 1987, HEC distributed about 4,200 computer 
programs to other Federal, state, local governments, 
universities, and private industry, both domestic 
and foreign. HEC actively provides assistance to all its 
program users.

INSTITUTE FOR WATER RESOURCES 
The Institute for Water Resources (IWR) was established 
in 1969 to provide a center for research and 
analysis which would contribute to developing, maintaining 
and managing the nation's water resources. The 
Chief of Engineers directed the Institute to: 
- Create methods for anlayzing and planning the comprehensive 
development and management of the nation's 
water resources. 
- Initiate, perform and monitor research to evaluate 
existing water resources planing methods and to develop 
new, innovative planning techniques. 
- Identify new applications for the Corps water 
resources development work. 
In 1979, IWR was incorporated with several other 
Corps elements into the Water Resources Support Center 
(WRSC). To conduct its current program, IWR is composed 
of three divisions: Policy Studies, Research and 
Navigation. The divisions are staffed by 30 professionals, 
with over 80% having previous Corps experience and over 
70% with advanced academic degrees. The IWR mission 
is to perform research in planning methods, conduct 
policy studies, manage data systems for planning and 
operations, maintain a center of expertise on water 
transportation planning and analysis, manage and conduct 
national and special studies, train Corps personnel 
in water resources planning, and provide consulting and 
technical assistance on water resource related problems 
and studies for OCE division and district offices and other 
government agencies. 
Research Division 
The Reseach Division responds to the water planning 
research needs of the field, as well as one-of-a-kind projects 
assigned by the Office of the Chief of Engineers. At 
the same time, research assistance is given to Corps field 
divisions and districts. The staff members of the Research 
Division apply their specialized knowledge of economics, 
sociology and engineering in developing and conducting 
the broad range of research aimed at producing practical 
and economical planning tools. Research outputs are applied 
in CW throughout the Corps, and, in several cases, 
to military problems. 
During FY87 the Research Division was responsible for 
three long range research programs: Planning 
Methodologies, Risk Assessment and Water Supply 
Planning. 
Planing Methodologies is focused on developing 
economic, financial, environmental and social evaluation 
techniques for planning flood control, navigation, and 
other water resources outputs. Work includes developing 
economic evaluation manuals, incrocomputer applications, 
regional analysis models, navigation project evaluation 
procedures, spatial data anlaysis techniques, deep 
draft navigation analysis, and flood control benefit 
estimation techniques. 
FY87 accomplishments in this program include an urban 
flood control and deep draft navigation evaluation 
manual, an assessment of planning management information 
needs, a methodology for evaluating the economic 
impact of competing ports on traffic and the benefits of 
port improvements, and a plan to enhance our ability to 
evaluate flood control benefits. 
The research and development program in risk analysis 
includes the development and application of risk analysis 
techniques to traditional Corps water resources planning 
areas of flood control and navigation. The work includes 
detailed analyses of risk perceptions, display, and 
communications techniques for public use. Several important 
topics cover the role of risk analysis in environmental 
planning. 
The risk research has produced the "Guidelines" for 
Phase I risk analysis; draft reports on alternative risk 
evaluation models; dam safety; socioeconomic considerations; 
rare flood theory; case study analysis; and risk 
evaluation simulation models. 
The Water Supply research program was completed in 
FY87 with the inclusion of a water conservation module 
into the IWR - MAIN water demand forecasting computer 
program. 
The Institute's training program provides a means for 
transferring research results and state-of-the-art planing 
techniques to various Corps users. Courses on topics ranging 
in scope from Conflict Management to Economic 
Analysis for Water Resource Planning were conducted 
during the year. During FY87 approximately 600 persons 
attended 19 sessions of 10 training courses. 
Policy Studies Division 
The Policy Studies Division undertakes investigations, 
studies, and research on emerging water resources issues 
to assist in the development of Corps policy and to provide 
the analytical bases for addressing current national 
water resources policy issues. The overall mission of the 
division is to provide policy analysis and decision support 
to the Director of Civil Works. The urgency of these 
issues generally precludes their inclusion in the research 
program which requires a more deliberate research needs 
identification and funding process. A typical policy study 
is accomplished within a period of 3-6 months and is accomplished 
entirely by the IWR staff. 
In FY 1987 the staff of the Policy Studies Division completed 
work on a dozen important studies. Several other 
activities, which were initiated a year earlier, were carried 
forward. Work undertaken for the Planning Division 
resulted in a published report on the role of the Corps 
in local flood warning and response systems. Taking a 
look at 50 years of experience and applying lessons learned 
to the present and future, the Division had a major 
role in a symposium on the 1936 Flood Control Act. Proceedings 
of "The Flood Control Challenge" will be 
published in FY88. 
Of the 12 reports completed in FY87, several have applications 
to increasingly significant water resource problems. 
The Corps concerns about leadership were addressed 
in a LEAD Team paper. A report was prepared 
for the Chief of Engineers on project partnership with 
local sponsors. 
Climate change and potential effect on Corps programs 
was the subject of a conference - the first held in North 
America. Co-sponsored by the Corps, representation was 
provided by the staff of the Policy Studies Division. 
Flood control, specifically the policy issue of Federal vs. 
non-Federal responsibilities (i.e. the 800 cfs issue), was 
evaluated in a series of white papers on the subject. 
53-2

With the passage of the Water Resource Development 
Act of 1986, the Corps of Engineers entered into a new 
era of project development and management. The Policy 
Studies Division participated in charting the Corps role 
in that change by preparing a report that addresses a 
broad range of planning, financing and development. 
NAVIGATION DIVISION 
The Navigation Division supports Corps planners by 
developing and maintaining transportation planning 
data bases on waterway carriers, other transportation 
modes, and commodity movements; development of 
analytical capabilities; and dissemination of technical information 
and advice with regard to use of navigation 
data and analytical techniques. The division also conducts 
studies and performs reimbursable and research 
studies for HQUSACE and field offices. 
With the advent of the Water Resources Development 
Act of 1986, the Navigation Division has supported the 
Inland Waterways Users Board by preparing analyses 
of the revenues, outlays and balance of the Waterway 
Trust fund under varying assumptions. A new report 
"The 1988 Annual Inland Waterway Review" was 
developed by the Navigation Division to provide a 10 year 
look ahead at the traffic, problems, performance and investment 
requirements on the inland waterways. This 
report provides a vehicle to discuss needs, budget constraints 
and priorities within the Corps and with the 
oeprators and shippers who use the system. 
Vessel operating costs (ocean and inland), waterway 
and tow characteristics, and commodity and other 
economic projections are maintained to support various 
navigation system studies. The Navigation Division has 
developed computer models to estimate economic development 
which would occur due to water resource and 
navigation projects, and maintains the navigation user 
charge data base, which is used to estimate impacts of 
various cost recovery policies and strategies. 
Research underway includes methods for estimating 
the economic impacts of longer trip times due to cleanup 
caused by congresion, methods for estimating vessel 
operating costs for ships which call on several ports, and 
completion of a user manual for economic anlaysis of deep 
draft channels. 
The Navigation Division has completed remarkable 
work for the Office of the Chief of Engineers and several 
Divisions and Districts. These projects range from special 
studies of project economics to evaluation of the employment 
and income effects of Corps navigation projects. A 
training session for 25 Corps personnel covering economic 
analysis of deep-draft and shallow-draft navigation projects 
was completed. 
FUSION CENTER 
The Fusion Center is a unique part of IWR composed 
of three interactive elements: a thorough, flexible process, 
a trained professional staff and a specially designed 
facility. 
The Center was organized to provide work groups, project 
teams, and task forces with creative problem-solving, 
strategic planning, and task group management 
capabilities in resolving dynamic, complex, systematic 
issues. The Fusion Center became part of the IWR on October 
1, 1986 upon transfer from Fort Belvoir. 
During FY87 the staff of the Fusion Center provided 
41 customer operations. Some of the activities at the 
Center are completed in several days while others extend 
over many months and may run as long as a year. For 
the Chief of Engineers, the Center staff facilitated the 
Chiefs Leadership Enhancement and Development 
Team, a Strategic Planning Initiatives Group, and 
several Civil Works team building sessions. The Center 
also assisted and facilitated the Army Engineer School 
Engineer Force Modernization Task Force, and a 
workshop on the Fort Belvoir DEH Backfill Planning. 
Among other important activities were DA Civilian Personnel 
Program Administration task groups and Army 
Long Range Stationing Study. 
NAVIGATION DATA CENTER 
The newly formed Navigation Data Center provides for 
the Corps navigation data collection, management and 
distribution. The new Center improves the opportunity 
for data integration under a single organization. The 
strategic planning for the systems integration and 
automation has been initiated for the three data areas: 
Waterborne Commerce, Lock Performance Monitoring, 
and Port Facilities. Each data area is at a different stage 
of development: 
WATERBORNE COMMERCE STATISTICS CENTER 
The planning for, and implementation of a relational 
database has begun. This involves the rewrite of the total 
software system, with completion scheduled in FY89. As 
a result of PL 99-662, Harbor Maintenance Fee, the 
WCSC received a new mission to provide vessel/cargo 
movement and shipper information to the U.S. Customs 
Service for audit purposes. 
53-3

LOCK PERFORMANCE MONITORING SYSTEM (PMS) 
PMS continues the collection and archiving of data. Initiated 
in FY87 was the test and evaluation of relational 
database software for future implementation, the use of 
CD-ROM for historical data archiving, and microcomputer 
application software. 
PORT FACILITIES 
Initiation of automated report preparation and the 
design for a Port Facilities database has begun. In support 
of the Harbor Maintenance Fee, brochures and maps 
were prepared for public distribution delineating the 
geographic boundaries for the fee implementation. In 
FY87, Port Facilities completed eight reports, as follows: 
Number Title 
12 Ports of Wilmington and Morehead City, NC 
13 Ports of Charleston and Georgetown, SC 
15 Ports of Jacksonville and Fernandino Beach, 
FL 
18 Port of Mobile, AL 
19 Porets of Panama City and Pensacola, FL; 
Pascagoula and Gulfport, MS; and Ports on 
the Apalachicola, Chattahoochee, and Flint 
Rivers. 
27 Port of San Diego, CA 
49 Ports of Duluth, MN; Superior, WI; Taconite 
Harbor, Silver Bay, and Two Harbors, MN; 
and Ashland, WI. 
68 Ports on the Missouri, Arkansas, Verdigris, 
White and Ouachita Rivers. 
53-4

APPENDIX A 
FLOOD CONTROL RESERVOIRS OPERABLE SEPTEMBER 30, 1987 
Permanent 
Pool Characteristics of Dam 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height Length 
Name River Basin Stream in Vicinity Useful Op. (Acre-Ft.) Pool (NPP) Functions Type (Feet) (Feet) 
ALASKA 
Chena River Lakes 
ARIZONA 
Adobe 
Alamo 
Cave Buttes 
Dreamy Draw 
New River 
Painted Rock 
Tat Momolikot 
Yukon 
-Kuskokwim 
Gila 
Colorado 
Gila 
Gila 
Gila 
Gila 
Gila 
Chena River 
Skunk Creek 
Bill Williams River 
Cave Creek 
Dreamy Draw 
New River 
Gila River 
Santa Rosa Wash 
Fairbanks 1981 2,000 NPP FR 
Phoenix 
Wenden 
Phoenix 
Phoenix 
Phoenix 
Gila Bend 
Casa Grande 
1982 18,350 NPP FR 
1968 1,046,310 560 FRWX 
1979 46,600 NPP FRX 
1973 320 NPP FRX 
1985 43,520 NPP F 
1959 2,476,340 NPP FRWX 
1974 198,550 NPP GWX 
ARKANSAS 
Blakely Mountain 
Dam 
Blue Mountain 
DeGray 
DeQueen 
Dierks 
Gillham 
Millwood 
Narrows Dam 
Nimrod 
CALIFORNIA 
Black Butte 
Brea 
Buchanan Dam- 
N.V. Eastman Lake 
Carbon Canyon 
Coyote Valley 
Dry Creek 
(Warm Springs) 
Lake and Channel 
Farmington 
Fullerton 
Hansen 
Narry L. Englebright 
Hidden Dam- 
Hensley Lake 
Isabella 
Lopez 
Martis Creek 
Merced County 
Stream Group: 
Bear 
Burns 
Mariposa 
Owens 
Mojave River 
New Hogan 
North Fork 
Pine Flat 
Prado 
San Antonio 
Santa Fe 
Sepulveda 
Success 
Terminus 
Whittier Narrows 
Ouachita Ouachita 
Arkansas 
Ouachita 
Red 
Red 
Red 
Red 
Ouachita 
Arkansas 
Hot Springs 1955 2,768,500 20,900 FP 
Petit Jean River Paris 
Caddo Arkadelphia 
Rolling Fork River DeQueen 
Saline River Dierks 
Cossatot River Gillham 
Little River Ashdown 
Little Missouri Murfreesboro 
Fourche La Fave River Plainview 
Sacramento Stony Creek Orland 
Santa Ana Brea Creek Fullert 
San Joaquin Chowchilla River Chowcl 
Santa Ana Carbon Canyon River Brea 
Russian East Fork Ukiah 
Russian River 
Russian 
San Joaquin 
Santa Ana 
Los Angeles 
Sacramento 
San Joaquin 
San Joaquin 
Los Angeles 
Sacramento 
Dry Creek Healdsburg 
Littlejohn Creek Farmington 
East Fullerton Creek Fullerton 
Big Tujunga Wash Los Angeles 
Yuba River Marysville 
Fresno River Madera 
Kern River Bakersfield 
Pacoima Wash San
Fernanado 
Martis Creek Reno 
San Joaquin Bear Creek 
San Joaquin Burns Creek 
San Joaquin Mariposa Creek 
San Joaquin Owens Creek 
Majave Mojave 
San Joaquin Calaveras 
Sacramento American River 
San Joaquin Kings River 
Santa Ana Santa Ana River 
Santa Ans San Antonio Creek 
San Gabriel San Gabriel River 
Los Angeles Los Angeles River 
San Joaquin Tule River 
San Joaquin Kaweah River 
San Gabriel San Gabriel River 
and Rio Hondo 
1947 257,900 2,910 FRWX 
1971 881,900 6,400 FRZRS 
1977 136,100 1,680 FSQRW 
1975 96,800 1,360 FSRAW 
1975 221,800 1,370 FSQW 
1966 1,854,930 29,200 FSW 
1949 407,900 2,500 FP 
1942 336,010 3,550 FSWX 
1963 160,000 770 FIRX 
1942 4,010 NPP FRX 
1975 150,000 470 FIRW 
1961 6,610 NPP FERX 
1959 122,500 1,700 FRX 
1983 381,000 500 FRSW 
1952 52,000 NPP F 
1941 760 NPP FRX 
1940 25,450 120 FRWX 
1941 69,000 400 DR 
1975 90,000 5,000 FIRW 
1953 570,000 1,850 FIRW 
1954 440 NPP FX 
1971 20,400 71 FSR 
1954 7,700 NPP F 
1950 7,000 NP F 
1948 15,000 NPP F 
1949 3,600 NPP F 
1971 89,670 NPP FRWX 
1963 325,000 715 FIRX 
1939 14,700 280 DR 
1954 1,000,000 NPP FIRX 
1941 196,240 NPP FRX 
1956 7,700 NPP FX 
1948 32,110 NPP FRX 
1941 17,430 NPP FRX 
1960 85,000 400 FIRX 
1961 150,000 345 FIRX 
1957 35,150 NPP FRWX 
Earth 
Earth 
Earth 
Earth 
Earth & Rock 
Earth & Rock 
Earth 
Concrete 
Concrete 
235 1,100 
115 
243 
160 
153 
160 
88 
175 
97 
Earth 156 
Earth 87 
Earth & Rock 205.5 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Concrete 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Concrete 
Concrete 
Concrete 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
99 2,610 
160 3,500 
319 3,000 
60 7,800 
45 575 
97 10,475 
280 1,142 
163 5,730 
185 4,952 
50 1,300 
113 2,670 
92 1,830 
55 4,075 
88 1,330 
75 790 
200 2,200 
429 1,820 
155 620 
429 1,820 
106 2,280 
160 3,850 
92 23,800 
57 15,444 
142 3,490 
250 2,375 
56 19,960 
A-1 
Earth 50 40,200 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
109 
283 
109 
50 
104 
1281 
75.5 
2,275 
975 
2,275 
448 
2,320 
4,780 
12,500 
2,800 
3,400 
2,360 
2,500 
1,750 
17,554 
941 
1,012 
2,970 
1,765 
1,800

APPENDIX A (Continued) 
FLOOD CONTROL RESERVOIRS OPERABLE SEPTEMBER 30,1987 
Permanent 
Pool Characteristics of Dam 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height Length 
Name River Basin Stream in Vicinity Useful Op. (Acre-Ft.) Pool (NPP) Functions Type (Feet) (Feet) 
COLORADO 
John Martin 
Trinidad 
CONNECTICUT 
Black Rock 
Colebrook River 
Hancock Brook 
Hop Brook 
Mansfield Hollow 
Northfield Brook 
Thomaston 
West Thompson 
IDAHO 
Lucky Peak 
ILLINOIS 
Carlyle 
Farmdale 
Fondulac 
Shelbyville 
Rend Lake 
INDIANA 
Brookville 
Cagles Mill 
Cecil M. Harden 
Huntington 
Mississinewa 
Monroe 
Patoka 
Salamonie 
IOWA 
Coralville 
Red Rock 
Saylorville 
KANSAS 
Council Grove 
El Dorado 
Elk City 
Fall River 
John Redmond 
Marion 
Pearson Skubitz 
Big Hill 
Toronto 
Arkansas Arkansas River 
Arkansas Purgatoire River 
Housatonic 
Connecticut 
Housatonic 
Housatonic 
Thames 
Thames 
Housatonic 
Thames 
Branch Brook 
West Branch, 
Farmington River 
Hancock Brook 
Hop Brook 
Natchaug River 
Northfield Brook 
Naugatuck River 
Quinebaug 
Columbia Boise River 
Upper 
Mississippi 
Upper 
Mississippi 
Upper 
Mississippi 
Upper 
Mississippi 
Upper 
Mississippi 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Upper 
Mississippi 
Upper 
Mississippi 
Upper 
Mississippi 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Kaskaskia River 
Farm Creek 
Fondulac Creek 
Kaskaskia River 
Big Muddy River 
East Fork of 
Whitewater River 
Mill Creek 
Raccoon Creek 
Wabash River 
Mississinewa 
Salt Creek 
Patoka River 
Salamonie 
Iowa River 
Des Moines River 
Des Moines River 
Grand (Neosho) 
Walnut River 
Elk River 
Fall River 
Grand (Neosho) 
Cottonwood River 
Big Hill Creek 
Verdigris River 
Lamar 
Trinidad 
Thomaston 
Riverton 
Plymouth 
Middlebury 
Willimantic 
Thomaston 
Thomaston 
Thompson 
Boise 
Carlyle 
East Peoria 
East Peoria 
Shelbyville 
Benton 
Brookville 
Tere Haute 
Rockville 
Huntington 
Peru 
Harrodsburg 
Ellsworth 
Wabash 
Iowa City 
Des Moines 
Des Moines 
Council Grove 
El Dorado 
Independence 
Fall River 
Burlington 
Marion 
Cherryvale 
Toronto 
1943 615,500 
1977 123,500 
1970 
1969 
1960 
1968 
1952 
1965 
1960 
1965 
8,700 
97,700 
4,030 
6,970 
52,000 
2,430 
42,000 
26,800 
1,844 FIR 
280 FIRX 
20 
760 
40 
21 
450
8 
NPP 
200 
FR 
FRSX 
FRW 
FR 
FRW 
FRW 
F
FRW 
1956 306,000 2,850 FIR 
1967 
1951 
1951 
1970 
1970 
1974 
1952 
1960 
1969 
1967 
1964 
1978 
1966 
983,000 
15,500 
3,780 
684,000 
294,000 
359,600 
228,120 
132,800 
153,100 
368,400 
441,000 
301,600 
263,600 
1958 492,000 
1969 1,830,000 
1975 602,000 
1964 
1981 
1966 
1949 
1964 
1968 
1981 
1960 
112,265 
236,200 
284,300 
256,400 
630,250 
143,850 
40,600 
200,800 
26,000 
NPP 
NPP 
11,100 
18,900 
2,250 
1,400 
1,100 
500 
1,100 
3,280 
2,010 
976 
1,820 
8,950 
74,000 
3,235 
8,000 
4,450 
2,350 
9,280 
6,200 
1,240 
2,660 
Concrete 
& Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
FSNRWA Earth 
F Earth 
F Earth 
FSNRW Earth 
FQRSW Earth 
FRSW 
FRX 
FRX 
FRW 
FRW 
FARS 
FRSQW 
FRW 
FARW 
FARWQ 
FARWQ 
FSQR 
FSQR 
FSQ 
FSX 
FSQR 
FRQS 
FSR 
FX 
Earth& Rock 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth & Rock 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
A-2 
106 13,274 
200 6,610 
154 
223 
57 
97 
68 
118 
142 
70 
933 
1,300 
630 
520 
12,420 
810 
2,000 
2,550 
250 1,700 
67 
80 
67 
108 
54 
182 
150 
117 
91 
137 
93 
84 
133 
100 
110 
125 
96 
99 
107 
94 
86.5 
67 
83 
90 
6,570 
1,275 
1,000 
3,000 
10,600 
3,000 
950 
1,790 
5,332 
8,100 
1,400 
1,550 
6,100 
1,400 
5,676 
6,750 
6,500 
20,930 
4,840 
6,015 
21,790 
8,375 
3,870 
4,712

APPENDIX A (Continued) 
FLOOD CONTROL RESERVOIRS OPERABLE SEPTEMBER 30,1987 
Permanent 
Pool Characteristics of Dam 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height Length 
Name River Basin Stream in Vicinity Useful Op. (Acre-Ft) Pool (NPP) Functions Type (Feet) (Feet) 
KENTUCKY 
Barren River 
Buckhorn 
Carr Fork 
Cave Run 
Dewey 
Fishtrap 
Grayson 
Green River 
Martins Fork 
Paintsville 
Nolin 
Rough River 
Tylorsville 
LOUISIANA 
Bayou Badcau 
Caddo Lake 
Wallace Lake 
MARYLAND 
Jennings Randolph 
Lake 
MASSACHUSETTS 
Barre Falls 
Birch Hill 
Buffumville 
Charles River Natural 
Valley Storage 
Conant Brook 
East Brimfield 
Hodges Village 
Knightville 
Littleville 
Tully 
West Hill 
Westville 
MINNESOTA 
Big Stone Lake- 
Whetstone River 
Lac Qui Parle 
Chippewa River 
LacQui Parle 
Marsh Lake 
Orwell 
Red Lake 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Cumberland 
Ohio 
Ohio 
Ohio 
Ohio 
Red 
Red 
Red 
Barren River 
Middle Fork of 
Kentucky River 
Carr Fork 
Licking River 
Johns Creek 
Levisa Fork, 
Big Sandy River 
Little Sandy 
Green River 
Martins Fork 
Paint Creek 
Nolin River 
Rough River 
Salt River 
Bayou Bodcau 
Cypress Bayou 
Cypress Bayou 
Potomac North Branch 
Potomac River 
Connecticut 
Connecticut 
Thames 
Charles 
Connecticut 
Connecticut 
Connecticut 
Connecticut 
Connecticut 
Connectiuct 
Blckstone 
Thames 
Ware River 
Millers River 
Little River 
Charles River 
Conant Brook 
Quinebaug River 
French River 
Westfield River 
Middle Branch, 
Westfield River 
Tullyt River 
West River 
Quinebaug River 
Upper Minnesota River 
Mississippi 
Upper Chippewa River 
Mississippi 
Upper Minnesota River 
Mississippi 
Upper Minnesota River 
Mississippi 
Red River Otter Tail River 
of the North 
Red River Red Lake River 
of the North 
Glasgow 
Buckhorn 
Hazard 
Farmers 
Paintsville 
Pikeville 
Grayson 
Campbells 
-ville 
Harlan 
Paintsville 
Kyrock 
Leitchfield 
Taylorsville 
Shreveport 
Shreveport 
Shreveport 
Barnum 
Barre 
So. Roylaston 
Charlton 
Millis 
Monson 
Fiskdale 
Oxford 
Huntington 
Chester 
Gryville 
Uxbridge 
Sturbridge 
Ortonville 
Montevideo 
Montevideo 
Montevideo 
Fergus Falls 
1964 815,200 4,340 FARS 
1960 168,000 550 FQRW 
1976 47,700 530 FQRW 
1974 614,100 6,790 FQRW 
1949 93,000 1,100 FARW 
1968 164,360 569 FARW 
1967 118,990 1,050 FQRW 
1969 723,200 5,070 FRSQW 
1978 21,00 578 FQ 
1983 73,500 261 FQRW 
1963 609,400 2,890 FAR 
1958 334,400 2,180 FRX 
1983 291,670 1,625 FQRW 
1949 357,300 NPP FRW 
1971 175,000 32,700 NFRS 
1946 96,100 2,300 FQRS 
1981 130,900 952 FQRS 
1958 24,000 NPP FRW 
1941 49,900 NPP FRW 
1958 12,700 200 FRW 
1983 35,000 NPP F 
1966 3,740 NPP F 
1960 30,000 360 FRW 
1959 12,800 NPP FRW 
1941 49,000 NPP FRW 
1965 32,400 275 FRWS 
1949 22,000 300 FRW 
1960 12,350 NPP FRW 
1961 11,100 23 FRW 
1973 45,000 12,700 FRW 
1950 (2) NPP FRWX 
1950 122,800 6,500 FRWX 
1953 14,100 210 FARS 
1953 14,100 210 FARS 
Red River 1951 2,680,000 279,000 FARSX 
Earth 146 3,970 
Earth 162 1,020 
Earth & Rock 130 720 
Earth & Rock 148 2,740 
Earth 118 913 
Rock 195 1,100 
Earth & Rock 120 1,460 
Earth & Rock 142 2,350 
Concrete 97 574 
Earth & Rock 160 1,600 
Earth & Rock 174 990 
Earth & Rock 124 1,530 
Earth & Rock 164 1,280 
Earth 70 12,850 
Concrete 3,700 
& Earth 
Earth 30 4,994 
Earth & Rock 296 2,130 
Earth & Rock 62 885 
Earth & Rock 56 1,400 
Earth & Rock 66 3,255 
Nonstructural - -- 
Earth & Rock 85 1,050 
Earth & Rock 55 520 
Earth & Rock 55 2,140 
Earth & Rock 160 1,200 
Earth & Rock 1,164 1,360 
Earth & Rock 62 1,570 
Earth & Rock 51 2,400 
Earth & Rock 78 560 
Earth 25 
Earth & Rock 21 
Earth & Rock 21 
Earth & Rock 19.5 
Eaarth & Rock 47 
Earth & Rock 15.5 
13,700 
17,97 
4,100 
11,800 
1,355 
36,500 
A-3

APPENDIX A (Continued) 
FLOOD CONTROL RESERVOIRS OPERABLE SEPTEMBER 30,1987 
Permanent 
Pool Characteristics of Dam 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height Length 
Name River Basin Stream in Vicinity Useful Op. (Acre-Ft.) Pool (NPP) Functions Type (Feet) (Feet) 
MISSISSIPPI 
Arkabutla Lake 
Enid Lake 
Grenada Lake 
Okatibbee 
Sardis Lake 
MISSOURI 
Clearwater 
Long Branch 
Wappapello 
NEW HAMPSHIRE 
Blackwater 
Edward MacDowell 
Franklin Falls 
Hopkinton-Everett 
Otter Brook 
Surry Mountain 
NEVADA 
Mathews Canyon 
Pine Canyon 
NEW MEXICO 
Abiquiu 
Conchas 
Galisteo 
Two Rivers: 
Diamond "A" Dam 
Rocky Dam 
Santa Rosa Dam & 
Reservoir 
NEW YORK 
Almond 
Arkport 
East Sidney 
Mount Morris 
Whitney Point 
NORTH CAROLINA 
B. Everett Jordan 
Falls 
W. Kerr Scott 
Lower 
Mississippi 
Lower 
Mississippi 
Lower 
Mississippi 
Pascagoula 
Lower 
Mississippi 
White 
Grande 
Chariton 
Lower 
Mississippi 
Merrimack 
Merrimack 
Merrimack 
Merrimack 
Merrimack 
Connecticut 
Connecticut 
Coldwater River 
Yocona River 
Yalobusha River 
Okatibbee Creek 
Little Tallahatchie 
River 
Black River 
Little Charlton 
St. Francis River 
Blackwater River 
Nubanusit Brook 
Pemigewasset River 
Contoocook River 
Piscataquog River 
Otter Brook 
Ashuelot River 
Colorado Mathews Canyon 
Colorado Pine Canyon 
Rio Grande 
Arkansas 
Rio Grande 
Rio Grande 
Rio Grande 
Pecos 
Susquehanna 
Susquehanna 
Susquehanna 
Genesee 
Susquehanna 
Cape Fear 
Neuse 
Yadkin- 
Pee Dee 
Rio Chama 
Canadian River 
Jemez River 
Rio Hondo 
Rocky Arroyo 
Pecos 
Canacadea Creek 
Canisteo Creek 
Ouleout Creek 
Genesee River 
Otselic River 
New Hope 
Neuse 
Yadkin 
Arkabutla 
Enid 
Grenada 
Meridian 
Sardis 
Piedmont 
Macon 
Wappapello 
Webster 
West 
Peterborough 
Feranklin 
West 
Hopkinton 
East Weare 
Keene 
Keene 
Caliente 
Caliente 
Pena Blanca 
Tucumcari 
Bernalillo 
Roswell 
Santa Ross 
Hornell 
Arkport 
Franklin 
Mount Morris 
Whitney Point 
1943 525,300 
1951 660,000 
1954 1,337,400 
1969 142,400 
1940 1,570,000 
1948 413,700 
1980 65,000 
1941 613,200 
1941 46,000 
1950 12,800 
1943 154,000 
1962 71,500 
1962 87,500 
1958 18,300 
1941 32,500 
5,100 F 
6,100 F 
9,800 F 
1,280 FQSR 
10,700 F 
1,630 FRWX 
2,430 FRSQW 
4,100 FR 
NPP FRW 
NPP FRW 
NPP FRW 
200 FRW 
120 FRW 
85 FRW 
265 FRW 
1957 6,270 NPP FX 
1957 7,750 NPP FX 
1975 596,300 
1939 529,000 
1953 102,700 
1963 168,000 
1979 447,000 
1949 14,600 
1940 7,900 
1950 33,550 
1952 337,000 
1942 86,440 
1,200 FRWX 
3,000 FIl 
NPP FX 
NPP FX 
NPP FIX 
124 FRW 
NPP F 
210 FRW 
170 FR 
1,200 FRW 
Earth & Rock 
Earth & Rock 
Earth & Rock 
Earth 
Earth & Rock 
Earth & Rock 
Earth 
Earth & Rock 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Concrete 
& Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Concrete & 
Earth 
Concrete 
Earth 
Durham 1982 753,500 14,300 FQRSWX Earth 
Raleigh 1983 335,600 11,300 FQRSWX Earth 
Wilkesboro 1963 153,000 1,470 FARSX Earth 
A-4 
81 
99 
102 
67 
117 
154 
71 
109 
75 
67 
140 
76 
115 
133 
86 
11,500 
8,400 
13,900 
6,543 
15,300 
4,225 
3,800 
2,700 
1,150 
1,030 
1,740 
790 
2,000 
1,288 
1,670 
71 800 
92 884 
251 
200 
135 
98 
212 
212 
90 
113 
130 
210 
95 
112 
92 
148 
28,300 
19,400 
780 
4,885 
2,940 
1,950 
1,260 
1,200 
2,010 
1,028 
4,900 
1,330 
1,915 
1,740

APPENDIX A (Continued) 
FLOOD CONTROL RESERVOIRS OPERABLE SEPTEMBER 30,1987 
Permanent 
Pool Characteristics of Dam 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height Length 
Name River Basin Stream in Vicinity Useful Op. (Acre-Ft.) Pool (NPP) Functions Type (Feet) (Feet) 
NORTH DAKOTA 
Baldhill 
Homme 
OHIO 
Alum Creek 
Berlin 
Caesar Creek 
Clarence J. Brown 
Deer Creek 
Delaware 
Michael J. Kirwan 
Mosquito Creek 
Muskingum River 
Reservoirs: 
Atwood 
Beach City 
Bolivar 
Charles Mill 
Clendening 
Dover 
Leesville 
Mohawk 
Mohicanville 
Piedmont 
Pleasant Hill 
Senecaville 
Tappan 
Wills Creek 
North Branch, 
Kakosing River Lake 
Paint Creek 
Tom Jenkins 
West Fork Mill Creek 
William H. Harsha 
OKLAHOMA 
Arcadia 
Birch 
Broken Bow 
Canton 
Copan 
Eufaula 
Fort Gibson 
Fort Supply 
Great Salt Plains 
Heyburn 
Hugo 
Hulah 
Kaw 
Keystone 
Ooologah 
Optima 
Red River Sheyenne River 
of the North 
Red River South Branch of 
of the North Park River 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Arkansas 
Arkansas 
Red 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Red 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Alum Creek 
Mahoning Creek 
Caesar Creek 
Buck Creek 
Deer Creek 
Licking River 
West Branch, 
Mahoning River 
Mosquito Creek 
Indian Fork 
Sugar Creek 
Sandy Creek 
Black Fork 
Brushy Fork 
Tuscarawas River 
McGuire Creek 
Walhondoing River 
Lake Fork 
Stillwater Creek 
Clear Fork 
Seneca Fork 
Little Stillwater Creek 
Wills Creek 
North Branch of 
Kakosing River 
Paint Creek 
East Branch, 
Sunday Creek 
Mill Creek 
Little Miami River 
Deep Fork River 
Birch Creek 
Mountain Fork 
North Canadian River 
Little Caney River 
Canadian 
Grand 
Wolf Creek 
Salt Fork, 
Arkansas River 
Polecat Creek 
Kiamichi River 
Caney River 
Arkansas River 
Arkansas 
Verdigris River 
North Canadian River 
Valley City 1950 70,000 325 FARS Earth 
Park River 1951 3,650 51 FARS Earth 
Africa 
Deerfield 
Wilmington 
Springfield 
New Holland 
Zanesville 
Newton Falls 
Cortland 
New
Cumberland 
Beach City 
Bolivar 
Muffin 
Tippecanoe 
Dover 
Leesville 
Nellie 
Mohicanville 
Piedmont 
Perrysville 
Senecaville 
Tappan 
Conesville 
Fredericktown 
New Petersburg 
Gloucester 
Mount Healthy 
Williamsburg 
Edmond 
Barnsdall 
Broken Bow 
Canton 
Copan 
Eufaula 
Muskogee 
Fort Supply 
Cherokee 
Sapulpa 
Hugo 
Caney 
Ponca City 
Tulsa 
Oologah 
Hardesty 
1975 134,800 348 FRSW 
1943 91,200 240 FARSWQ 
1978 242,200 13,300 FRSQW 
1974 63,700 1,010, FQRW 
1968 102,500 727 FRW 
1961 273,000 1,325 FRWX 
1966 78,700 580 FAQRSW 
1944 104,100 700 FARSWQ 
1937 49,700 1,540 FRX 
1937 71,700 420 FRX 
1938 149,600 NPP FR 
1936 88,000 1,350 FRX 
1937 54,000 1,800 FRX 
1938 203,000 350 FRX 
1937 37,400 1,000 FRX 
1937 285,000 NPP FR 
1936 102,000 NPP FR 
1937 65,000 2,270 FRX 
1938 87,700 850 FRX 
1937 88,500 3,550 FRSX 
1936 61,60-0 2,350 FRX 
1937 196,000 900 FRX 
1973 14,900_ 98 FRW 
1972 145,000 710 FRSQW 
1951 26,900 394 FRSWX 
1952 11,380 200 FRX 
1978 284,500 18,760 FRSQW 
1986 92,000 1,820 FSR 
1977 58,200 1,137 FSQRW 
1970 1,368,200 14,200 FSRWP 
1948 377,100 7,910 FSI 
1983 227,700 4,850 FSQRW 
1964 3,825,400 105,500 FSPN 
1953 1,284,400 19,000 FP 
1942 100,700 1,820 FSX 
1941 271,400 8,690 FRWX 
1950 55,030 880 FRWXS 
1974 966,700 13,250 FSQRW 
1951 289,000 3,570 FSAX 
1976 1,348,000 17,040 FSQRW 
1964 1,737,600 23,610 FSPYW 
1963 1,519,000 24,460 FSN 
1978 229,500 5,340 FSRW 
61 
67 
Concrete & 
Earth 
Concrete & 
Earth 
Earth & Rock 
Earth & Rock 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Concrete 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth & Rock 
Concrete 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
93 
96 
165 
72 
93 
118 
83 
47 
65 
64 
87 
48 
64 
83 
74 
111 
46 
56 
113 
45 
52 
87 
71 
118 
84 
100 
200 
104 
97 
225 
73 
70 
114 
110 
85 
68 
89 
101 
94 
125 
121 
137 
120 
A-5 
1,650 
865 
10,000 
5,750 
2,750 
6,620 
3,880 
1,400 
9,900 
5,650 
3,700 
5,600 
6,300 
1,390 
950 
824 
1,694 
2,330 
1,220 
1,750 
775 
2,350 
1,550 
1,950 
1,400 
700 
944 
1,100 
1,450 
5,250 
3,193 
4,026 
15,140 
7,730 
3,200 
2,990 
12,225 
6,010 
2,920 
10,200 
5,200 
9,466 
4,600 
4,000 
15,200

APPENDIX A (Continued) 
FLOOD CONTROL RESERVOIRS OPERABLE SEPTEMBER 30,1987 
Permanent 
Pool Characteristics of Dam 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height Length 
Name River Basin Stream in Vicinity Useful Op. (Acre-Ft.) Pool (NPP) Functions Type (Feet) (Feet) 
OKLAHOMA (Continued) 
Little River 
Jackfork Creek 
Hominy Creek 
Arkansas 
Beaver Creek 
Poteau River 
Applegate River 
Blue River 
Coast Fork, 
Willamette River 
Row River 
Middle Fork, 
Willamette River 
Long Tom River 
Willow Creek 
Wright City 
Clayton 
Skiatook 
Tulsa 
Waurika 
Wister 
Medford 
Blue River 
Cottage Grove 
Cottage Grove 
Eugene 
Eugene 
Heppner 
1969 465,780 
1983 429,600 
1985 500,700 
1953 1,230,800 
1977 343,500 
1949 427,900 
1981 82,000 
1968 85,000 
1942 30,060 
1949 70,500 
1965 115,000 
1941 110,000 
1983 13,250 
3,750 FSQW Earth 
14,360 FSRW Earth 
10,190 FSQRW Earth 
12,900 FP Earth 
10,100 FISQWR Earth 
5,360 FSAX Earth 
988 AFIQRSW Gravel 
Embankment 
975 FINR Earth 
1,155 FINR Concrete & 
& Earth 
1,885 FINR Concrete 
& Earth 
1,865 FINR Rockfill 
& Concrete 
10,305 FINR Rockfill 
& Concrete 
96 FRN Roller 
Compacted 
Concrete 
PENNSYLVANIA 
Alvin R. Bush 
Aylesworth Creek 
Beltzville 
Blue Marsh 
Conemaugh 
Cowanesque 
Crooked Creek 
Curwensville 
East Branch, 
Clarion River 
Foster Joseph Sayers 
Francis E. Walter 
(Bear Creek) 
Gen. Edgar Jadwin 
Indian Rock 
Kinzua 
Loyalhanna 
Mahoning Creek 
Prompton 
Raystown 
Shenanago 
Stillwater 
Tioga-Hammond 
Lakes 
Hammond Lakes 
Tionesta 
Union City 
Woodcock Creek 
Youghiogheny River 
Susquehanna 
Susquehanna 
Delaware 
Delaware 
Ohio 
Susquehanna 
Ohio 
Susquehanna 
Ohio 
Susquehanna 
Delaware 
Delaware 
Susquehanna 
Ohio 
Ohio 
Ohio 
Delaware 
Susquehanna 
Ohio 
Susquehanna 
Susquehanna 
Susquehanna 
Ohio 
Ohio 
Ohio 
Ohio 
Kettle Creek 
Aylesworth Creek 
Pohopco Creek 
Tulephoken Creek 
Conemaugh River 
Cowanesque River 
Crooked Creek 
West Branch, 
Susquehanna River 
East Branch, 
Clarion River 
Bald Eagle Creek 
Lehigh River 
Dyberry Creek 
Codorus Creek 
Allegheny River 
Loyalhanna Creek 
Mahoning Creek 
Lackawaxem River 
Raystown Branch, 
Juniata River 
Shenanago River 
Lackawanna River 
Tioga River 
Crooked Creek 
Tionesta Creek 
French Creek 
French Creek 
Youghiogheny River 
Renovo 
Archbald 
Lehighton 
Reading 
Saltsburg 
Larenceville 
Ford City 
Curwensville 
Wilcox 
Blanchard 
White Haven 
Honesdale 
York 
Warren 
Saltsburg 
New Bethlehem 
Honesdale 
Huntingdon 
Sharpsville 
Uniondale 
Tioga 
Tioga 
Tionesta 
Union City 
Meadville 
Confluence 
1962 75,000 
1970 1,700 
1971 68,250 
1978 50,010 
1952 274,000 
1980 89,000 
1940 93,900 
1965 124,200 
1952 84,300 
1969 99,000 
1961 110,700 
1960 24,500 
1942 28,000 
1965 1,180,000 
1942 95,300 
1941 74,200 
1960 52,000 
1973 762,000 
1966 191,400 
1960 12,000 
1978 62,000 
1978 63,000 
1940 133,400 
1970 47,640 
1973 20,000 
1943 254,000 
160 FRW 
NPP F 
947 FQRSW 
960 FAQRS 
300 FW 
410 FR 
350 FRW 
790 FR 
90 FARQW 
1,730 FRW 
80 FNRW 
NPP F 
NPP FRW 
1,900 PFAQRW 
210 FRW 
170 FRW 
290 FNRW 
8,300 FRW 
1,910 FAQRW 
85 FS 
470 FR 
680 FR 
480 FRW 
NPP F 
118 FQRA 
450 FARWQ 
A-6 
Pine Creek 
Sardis 
Skiatook 
Tenkiller 
Waurika 
Wister 
OREGON 
Applegate 
Blue River 
Cottage Grove 
Dorena 
Fall Creek 
Fern Ridge 
Willow Creek 
Red 
Red 
Arkansas 
Arkansas 
Red 
Arkansas 
Rogue River 
Columbia 
Columbia 
Columbia 
Columbia 
Columbia 
Columbia 
124 
81 
143 
197 
106 
99 
242 
319 
114 
145 
193 
49 
160 
7,712 
14,138 
3,590 
3,000 
16,600 
5,700 
1,300 
1,329 
2,110 
3,352 
5,100 
6,624 
1,780 
Earth & Rock 
Earth & Rock 
Earth & rock 
Earth & Rock 
Concrete 
& Earth 
Earth & Rock 
Earth 
Earth 
Earth 
Earth 
Earth & rock 
Earth 
Earth 
Concrete 
& Earth 
Concrete 
& Earth 
Concrete 
Earth 
Earth & Rock 
Concrete 
Earth 
Earth & Rock 
Earth & Rock 
Earth 
Earth 
Earth 
Earth 
165 
90 
170 
98 
137 
151 
143 
131 
184 
100 
234 
112 
83 
1'77 
114 
162 
140 
225 
68 
77 
140 
122 
154 
88 
90 
184 
1,350 
1,270 
4,300 
1,775 
1,265 
3,100 
1,480 
2,850 
1,725 
6,835 
3,000 
1,273 
1,000 
1,877 
960 
926 
1,230 
1,700 
720 
1,700 
2,710 
6,450 
1,050 
1,420 
4,650 
1,610

APPENDIX A (Continued) 
FLOOD CONTROL RESERVOIRS OPERABLE SEPTEMBER 30,1987 
Permanent 
Pool Characteristics of Dam 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height Length 
Name River Basin Stream in Vicinity Useful Op. (Acre-Ft.) Pool (NPP) Functions Type (Feet) (Feet) 
SOUTH DAKOTA 
Cold Brook 
Cottonwoiod Springs 
Lake Traverse: 
Reservation Control 
Dam 
White Rock 
TEXAS 
Addicks 
Aquilla 
Bardwell 
Barker 
Belton 
Benbrook 
Ferrells Bridge Dam- 
Lake O' the Plains 
Granger Dam and Lake 
Grapevine 
Hords Creek 
Lake Kemp 
Lavon 
Lewisville 
Navarro Mills 
North San 
Gabriel Dam, 
Lake Georgetown 
O.C. Fisher 
Pat Mayse 
Proctor 
Somerville 
Stillhouse Hollow 
Waco 
Wright Patman 
VERMONT 
Ball Mountain 
North Hartland 
North Springfield 
Townshend 
Union Village 
VIRGINIA 
John W. Flannagan 
Gathright Dam & 
Lak Moomaw 
North Fork of 
Pound River 
Missouri 
Missouri 
Red River 
of the North 
Red River 
of the North 
San Jacinto 
Brazos 
Trinity 
San Jacinto 
Brazos 
Trinity 
Red 
Brazos 
Trinity 
Colorado 
Red 
Trinity 
Trinity 
Trinity 
Brazos 
Colorado 
Red 
Brazos 
Brazos 
Brazos 
Brazos 
Red 
Connecticut 
Connecticut 
Connecticut 
Connecticut 
Connecticut 
Ohio 
James 
Chehalis 
Cold Brook 
Cottonwood Springs 
Creek 
Bois de Sioux River 
Bois de Sioux River 
Sourth Mayde Creek 
Aquilla Creek 
Waxahachie creek 
Buffalo Bayou 
Leon River 
Clear Fork, 
Trinity River 
Cypress Creek 
San Gabriel River 
Denton Creek 
Hords Creek 
Wichita River 
East Fork, 
Trinity River 
Elm Fork, 
Trinity River 
Richland Creek 
North Fork, 
San Gabriel River 
North Concho River 
Sanders Creek 
Leon River 
Yegua Creek 
Lampasas River 
Bosque River 
Sulphur River 
West River 
Ottauguechee River 
Black River 
West River 
Hot Springs 
Hot Springs 
Wheaton 
Wheaton 
Addicks 
Hillsboro 
Ennis 
Barker 
Belton 
Fort Worth 
Jefferson 
Granger 
Grapevine 
Coleman 
Wichita Falls 
Fort Worth 
Lewisville 
Corsicana 
Georgetown 
San Angelo 
Paris 
Comanche 
Somerville 
Belton 
Waco 
Texarkana 
Jamaica 
North Hartland 
Springfield 
Townshend 
Ompompanoosuc River Union Village 
Pound River 
Jackson 
Wynoochee River 
Haysi 
Alleghany 
Montesano 
19534 7,200 36 FRWX Earth 
1970 8,385 41 FRWX Earth 
1941 164,500 10,925 FRX 
1941 85,000 6,500 FRX 
1948 204,500 
1983 146,000 
1965 140,000 
1945 207,000 
1954 1,097,600 
1952 258,600 
1959 842,100 
1980 244,200 
1952 425,500 
1948 25,310 
1972 502,900 
1953 748,200 
1954 989,700 
1962 212,200 
1980 130,800 
1952 396,400 
1967 189,100 
1963 374,200 
1967 507,500 
1968 630,400 
1965 726,400 
1957 2,654,300 
1961 54,600 
1960 71,420 
1960 51,067 
1961 33,700 
1950 38,000 
1963 145,700 
1979 123,739 
1972 70,000 
NPP FX 
3,280 FSX 
3,570 FRSX 
NPP FX 
12,300 FIRSX 
3,770 FNRXA 
18,700 FRS 
4,400 FRSWX 
7,280- FNRSXA 
510 FARSX 
15,590 FX 
21,400 FRSW 
23,280 FRSX 
5,070 FRSX 
1,310 FRSWX 
5,440 FRSX 
5,993 FRSX 
4,610 FRSX 
11,460 FRSX 
6,430 FRSX 
7,270 FRSX 
20,300 FRSX 
75 FRW 
220 FRW 
290 FRW 
100 FRW 
NPP FRW 
310 FAWR 
2,532 FQR 
1,150 FSARI 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth & Rock 
Earth 
Earth 
Earth 
Rock 
Earth 
Earth 
Earth 
Earth 
Earth 
Concrete 
& Earth 
Earth 
Concrete 
& Earth 
Concrete 
& Earth 
Concrete 
& Earth 
Concrete 
& Earth 
Concrete 
& Earth 
Concrete 
& Earth 
Earth & Rock 
Concrete 
& Earth 
127 925 
123 1,190 
14 9,100 
16 14,400 
49 61,166 
104.5 11,890 
82 15,400 
37 72,844 
192 5,524 
130 9,130 
97 10,600 
115 16,320 
137 12,850 
91 6,800 
115 8,890 
81 19,483 
125 32,888 
82 6,700 
164 6,700 
128 40,885 
96 7,080 
86 13,460 
80 26,175 
200 15,624 
140 24,618 
100 18,500 
265 915 
185 1,520 
120 2,940 
133 1,700 
170 1,100 
250 960 
257 1,172 
177 1m700 
A-7

APPENDIX A (Continued) 
FLOOD CONTROL RESERVOIRS OPERABLE SEPTEMBER 30,1987 
Permanent 
Pool Characteristics of Dam 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height Length 
Name River Basin Stream in Vicinity Useful Op. (Acre-Ft.) Pool (NPP) Functions Type (Feet) (Feet) 
WASHINGTON 
Howard A. Hanson 
Mill Creek 
Mud Mountain 
Wynoochee 
WEST VIRGINIA 
Beech Fork 
Bluestone 
Burnsville 
East Lynn 
R. D. Bailey 
Summersville Lake 
Sutton 
Tygart River 
WISCONISIN 
Eau Galle 
Green 
Columbia 
Puyallup 
Chehalis 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Green River 
Mill Creek 
White River 
Wynoochee River 
Kanaskat 
Walla Walla 
Enumclaw 
Montesano 
1961 106,000 1,600 FAS Rock 
1942 8,300 225 FR Earth 
1953 106,000 NPP FR Rock 
1972 70,000 1,150 FSARI Concrete 
& Earth 
235 675 
145 3,200 
425 700 
177 1,700 
Beech Fork Lavalette 1977 37,540 450 FRW Earth 86 1,080 
New River Hinton 1952 631,000 1,800 FRWX Concrete 180 2,048 
Little Kanawha Burnsville 1977 65,400 550 FQRW Earth & Rock 89 1,400 
Twelve Pole Creek East Lynn 1970 82,500 823 FQRW Earth & Rock 122 650 
Guynabdot River Justice 1979 203,700 440 FQRW Earth & Rock 310 1,397 
Gauley River Summersville 1965 413,800 407 FANR Rock 390 2,280 
Elk River Sutton 1960 265,300 270 FNAR Concrete 220 1,921 
Tygart River Grafton 1938 287,700 620 FNAR Concrete 230 1,921 
Chippewa Eau Galle Spring Valley 1969 43,600 150 FR Earth 122 1,600 
A-8

FLOOD CONTROL RESERVOIRS CONSTRUCTED OR CONTRIBUTED TO 
BY CORPS OF ENGINEERS BUT OPERATED BY OTHERS 
SEPTEMBER 30, 1986 
Permanent 
Pool Characteristics of Dam 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height Length 
Name River Basin Stream in Vicinity Useful Op. (Acre-Ft.) Pool (NPP) Functions Type (Feet) (Feet) 
CALIFORNIA 
Big Dry Creek 
Comanche 2 
Cherry Valley3 
Del Valle 
Eaton Wash 
New Bullards Bar 2 
New Don Pedro3 
New Exchequer2 
Oroville 2 
Tahchevah Creek 
COLORADO 
Pinon Canyon 
CONNECTICUT 
East Branch 
Hall Meadow Brook 
Mad River 
Sucker Brook 
IDAHO 
Ririe 
MARYLAND 
Savage River 
MISSOURI 
Bear Creek 
NEW YORK 
Onandaga 
OKLAHOMA 
Altus4 
Lake Hudson5 
Grand Lake O' 
the Cherokees 
UTAH 
Big Wash 
VERMONT 
East Barre 
Waterbury 
Wrightsville 
San Joaquin 
San Joaquin 
Tuolumne 
Alameda 
Rio Hondo 
Sacramento 
San Joaquin 
San Joaquin 
Sacramento 
Whitewater 
Big Dry Creek 
Mokelumne River 
Cherry Creek 
Arroyo Del Valle 
Eaton Wash 
Yuba River 
Tuolomne River 
Merced River 
Feather River 
Tahchevah Creek 
Colorado Pinon Canyon Arroyo 
Housatonic 
Housatonic 
Connecticut 
Connecticut 
East Branch, 
Naugatuck River 
Hall Meadow Brook 
Mad River 
Sucker Brook 
Upper Snake Willow Creek 
Potomac Savage 
Upper Bear Creek 
Mississippi 
Oswego Onondaga Creek 
Red North Fork, Red 
Arkansas Grand (Neosho) River 
Arkansas Grand (Neosho) River 
Beaver Big Wash 
Winooski Jail Branch 
Winooski Waterbury 
Winooski North Branch, 
Fresno 
Clements 
Sonora' 
Livermore 
Pasadena 
Marysville 
Modesto 
Merced 
Oroville 
Palm Springs 
Trinidad 
Torrington 
Torrington 
Winchester 
Winchester 
1948 16,250 
1963 431,500 
1956 268,000 
1968 77,000 
1937 960 
1968 960,00 
1970 2,030,000 
1966 1,026,000 
1964 3,539,000 
1965 960 
NPP 
NPP 
475 
200 
NPP 
1,910 
3,520 
1,900 
5,838 
NPP 
F
FRS 
FS 
FRS 
F
FIRPW 
FISP 
FIR 
FIRSW 
F 
Earth 40 
Earth &Rcck 171 
Earth & Rock 315 
Earth 223 
Earth 82 
Concrete 645 
Earth & Rock 565 
Rock 480 
Earth 770 
Earth 42 
1964 4,350 NPP FRW Earth 
1964 4,350 
1962 8,620 
1963 9,700 
1970 1,480 
NPP 
NPP 
10 
NPP 
FR 
F
FR 
F 
20,038 
2,450 
2,500 
880 
1,795 
2,323 
1,920 
1,200 
6,850 
3,610 
92 700 
Earth 92 
Earth & Rock 73 
Earth 178 
Earth 68 
Idaho Falls 1979 100,500 364 FIR Earth 
100 
1,200 
940 
1,160 
184 840 
Western Port 1952 20,000 360 FRS Earth & Rock 184 
Hannibal 1962 8,700 NPP F Earth 
Syracuse 1949 18,200 NPP F Earth 
Altus 1948 152,429 6,260 
Locust Grove 1964 444,500 10,0006 
Disney 
Milford 
East Barre 
Waterbury 
Wrightsville 
1941 2,197,000 46,5006 
1961 1,200 NPP 
1938 12,050 NPP 
1938 37,000 890 
1938 20,300 570 
FISR 
FRP 
FRP 
1,050 
65 1,450 
67 1,782 
Concrete 98 1,112 
Concrete 147 4,494 
& Earth 
Concrete 147 6,565 
F Earth 
F
FRH 
FR 
Earth 
Earth 
Earth 
34 2,814 
65 
158 
115 
1,460 
1,800 
1,525 
A-9 
- -~-~--I -- --

FLOOD CONTROL RESERVOIRS CONSTRUCTED OR CONTRIBUTED TO 
BY CORPS OF ENGINEERS BUT OPERATED BY OTHERS 
SEPTEMBER 30, 1986 (Continued) 
NOMENCLATURE FOR PROJECT FUNCTIONS 
A - Low Flow Augmentation 
D - Debris Control 
F - Flood Control 
I - Irrigation 
N - Navigation 
P - Power 
Q - Water Quality Control 
R - Public Recreation (Annual Attendance exceeding 5,000) 
S - Water Supply 
W - Fish and Wildlife (Federal or State) 
X - Water Conservation and Sedimentation 
1 Acres of Water surface at top of permanent pool 
2 Federal Government contributed for flood storage 
3 Cherry Valley Reservoir: Planned and constructed by local interests as initial phase; provided flood control on itnerim basis. Second and final phase,N ew Don 
Pedro Reservoir: Federal Government contributed for flood protection, construction and operation by City and County of San Fransisco, and Turlock and 
Modesto Irrigation Districts. 
4 Construction by Bureau of Reclamation. Participation by Department of the Army to finance flood control portion. 
5 Construction by Grand River Dam Authority. Participation by Department of the Army to finance flood control portion. 
6 Top of power pool. 
A-10

APPENDIX B 
FLOOD CONTROL PROJECTS UNDER CONSTRUCTION DURING FISCAL YEAR 
1987 
Fiscal Year 
Fiscal Placed in Completed or 
Year Useful Scheduled for 
Project Started Operation Completion Nature of Project 
Allegheny River, Oil City, PA............................................ 
Allegheny River, Tionesta, PA........................................... 
Alton to Gale Levee System, Mississippi 
River, IL and M O ..................................................... 
Alum Creek Lake, OI....................................................... 
Ararat River, Mt. Airy, NC (Sec 205)................................. 
Arcadia Lake, OK......................................................... 
Ardsley, NY........................................................................ 
Arkansas-Red Basins Chloride Control (Area VIII), 
Ok, TX, and KS (Stage I)............................................ 
Ascalmore-Tippo Items, MS.............................................. 
B. Everett Jordan Dam and Lake, NC.............................. 
Beaver Creek, Webster Co., NE, Bridge 14710 (Sec 14)... 
Beaver Creek, Webster Co., NE, Bridge 23025 (Sec 14)... 
Beaver Creek, Webster Co., NE, Bridge 43430 (Sec 14)... 
Beaver River, Bridgewater, PA (Sec 14)........................... 
Bee Lake Drainage Structure............................................ 
Beech Fork Lake, WV....................................................... 
Bettendorf, IA .................................................................... 
Big Blue River, Saline Co., NE, Tuxedo Park Read & 
Bridge (Sec 14).......................................................... 
Big Brown Creek & Tributary, Prentiss Co., MS............. 
Big Sioux River, Harrisburg, SD (Sec 14)......................... 
Big Sioux River, Sec., 32, Plymouth Co., IA (Sec 14)........ 
Big Sioux River, Well House, SD (Sec 14)........................ 
Big South Fork National River & 
Recreation Area, KY and TN...................................... 
Big Stone Lake & Whetstone River, MN and SD............. 
Big Wood River, ID (Sec 208).......................................... 
Black Bear and Miller Lakes, Crow Wing 
County, WI 9Sec 205)................................................. 
Blackbird Creek, Burt Co., NE (Sec 14)............................. 
Black River, Butler County Road 607, MO (Sec 14)......... 
Blackstone River, Millbury, MA (Sec 14).......................... 
Bloomington Lake, MD and WV........................................ 
Boggy Creek, TX................................................................ 
Boise River, ID (Sec 208)................................................... 
Boligee Canal, Boligee, AL............................................... 
Bridgeport, MI (Sec 14).................................................... 
Brookville, Lake, IN.......................................................... 
Brush Bayou, LA............................................................... 
Buffalo Bayou and Tributaries, TX................................... 
Buffalo Bayou and Tributaries, TX, Addicks and 
Barker, Dam Saftey Assurance.................................. 
Biirnsville Lake, WV......................................................... 
Caesar Creek Lake, OH.................................................... 
Calloway Branch, TX.......................................................... 
Candy Lake, OK ................................................................ 
Canton Bridge, Trigg Co., KY............................................ 
1982 
1982 
1983 
1970 
1985 
1980 
1987 
1976 
1984 
1967 
1986 
1986 
1986 
1986 
1987 
1970 
1982 
1986 
1986 
1985 
1984 
1985 
1979 
1971 
1984 
1984 
1985 
1985 
1985 
1971 
1985 
1984 
1986 
1986 
1966 
1977 
1956 
1986 
1972 
1971 
1985 
1976 
1986 
1983 
1983 
1975 
1987 
1986 
1987 
1982 
1987 
1987 
1987 
1978 
1986 
1987 
1987 
1987 
1975 
1987 
1985 
1986 
1981 
1986 
1987 
1974 
1978 
1986 
1984 
1984 
1984 
1986 
1987 
1990 
1989 
19883 
1987* 
1989 
1987 
1987 
1987 
1988 
1988 
1987 
1987 
1987 
1987 
1987 
1987 
1987 
1988 
1988 
1985 
1988 
1987 
1986 
1986 
1984 
1990 
1985 
1986 
1987 
1983 
1980 
Indefinite 
1989 
1986 
1985 
1986 
Deferred 
1987 
Streambank Protection 
Streambank Protection 
Local Protection 
Reservoir 
Local Protection 
Reservoir 
Local Protection 
Chloride Control 
Local Protection 
Reservoir 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Reservoir 
Local Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
National Recreation Area 
Local Protection 
Snagging and Clearing 
Local Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Reservoir 
Local Protection 
Snagging and Clearing 
Snagging and Clearing 
Streambank Protection 
Reservoir 
Local Protection 
Local Protection 
Dam Safety 
Reservoir 
Reservoir 
Local Protection 
Reservoir 
Streambank Protection 
B-1

APPENDIX B (Continued) 
FLOOD CONTROL PROJECTS UNDER CONSTRUCTION DURING FISCAL YEAR 
1987 
Fiscal Year 
Fiscal Placed in Completed or 
Year Useful Scheduled for 
Project Started Operation Completion Nature of Project 
Carrfork Lake, KY............................................................ 
Catherine Creek, OR (Sec 208)......................................... 
Cave Run Lake, KY......................................................... 
Central and Southern, FL................................................. 
Chartiers Creek, McKees Rocks & Kennedy TWP, 
PA (Sec 14)................................................................ 
Chattahoochee River, Eugaula, AL.................................. 
Chena River Lakes, AK................................................... 
Chillicothe, OH................................................................ 
Clear River, Burrillville, RI (Sec 14)................................. 
Columbus, NE (Sec 205.................................................... 
Conesus Lake, Lovonia, NY (Sec 205)............................... 
Cooper Lake and Channels, TX......................................... 
Copan Lake, OK .............................................................. 
Corte Madera Creek, CA................................................... 
Cowanesque Lake, PA....................................................... 
Covered Bridge, Housatonic River, Sheffield, MA 
(Sec 14)...................................................................... 
Creek Road Bridge, MS............................................. 
Cucamonga Creek, CA.................................................... 
Dade County, FL............................................................. 
Darby Creek, PA............................................................. 
Dayton, KY....................................................................... 
Demonstration Erosion Control, MS................................. 
Deschutes River, OR (Sec 205)........................................... 
Devils Lake, ND (Sec 205)................................................ 
Dry Creek (Warm Springs) Lake & Channel.................... 
Dunbar (Sewage Facilities), WV (Sec 14).......................... 
East Branch, Cooper River, Pompion Hill Chapel 
near Huger, SC (Sec 14)............................................. 
East Branch, Chagrin River, Baldwin Rd, Kirtland, 
O H (Sec 14).................................................................. 
East Branch, Chagrin River, SR 615, Kirtland OH 
(Sec 14) ..................................................................... 
East Lynn Lake, W V......................................................... 
East Rockaway Inlet to Rockaway Inlet & Jamaica 
Bay, NY, Part I......................................................... 
East St. Louis and Vicinity, IL.......................................... 
El Dorado Lake, KS.......................................................... 
El Paso, TX ...................................................................... 
Elizabeth, NJ................................................................... 
Elk Creek, Clarksburg, WV (Sec 14)................................. 
Elk Creek Lake, OR........................................................ 
Elk Creek, Willis, NE (Sec 14)........................................... 
Ellicot Creek, NY............................................................. 
Elm Creek, Burt Co., NE (Sec 14)..................................... 
Elm Creek, Webster Co., NE, Bridge 23015 (Sec 14)........ 
Elm Creek, Webster Co., NE, Bridge 33425 (Sec 14)........ 
Elwha Klallam Reservation, Elwha, WA (Sec 205).......... 
1964 
1985 
1965 
1950 
1986 
1986 
1973 
1971 
1986 
1982 
1986 
1958 
1973 
1966 
1987 
1986 
1985 
1976 
1975 
1986 
1978 
1985 
1987 
1983 
1967 
1986 
1986 
1986 
1986 
1965 
1975 
1974 
1974 
1971 
1972 
1986 
1971 
1985 
1986 
1985 
1986 
1986 
1987 
1976 
1982 
1987 
1981 
1987 
1986 
1983 
1990 
1984 
1986 
1987 
1997 
1987 
1987 
1989 
1986 
1987 
1988 
1988 
1992 
1989 
1989 
1990 
1987 1987 
1985 1985 
1982 1988 
1992 
1987 
1982 1986 
Indefinite 
1988 
1986 1988 
1983 Indefinite 
1987 
1987 
1987 
1987 
1970 
1987 
1987 
1987 
1982 
1977 1988 
1986 
1981 1989 
1973 Indefinate 
1988 
1987 
1990 
1987 1987 
1989 
1987 
1987 1987 
1987 1987 
1988 
Reservoir 
Snagging and Clearing 
Reservoir 
Local protection 
Streambank Protection 
Shoreline Protection 
Reservoirs and Levee 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Reservoir, channel 
improvement 
Reservoir 
Local Protection 
Water Supply Modification 
Streambank Protection 
Streambank Protection 
Local Protection 
Shore Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Reservoir 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Reservoir 
Beach Nourishment 
Local Protection 
Reservoir 
Local Protection 
Local Protection 
Streambank Protection 
Reservoir 
Streambank Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
B-2

APPENDIX B (Continued) 
FLOOD CONTROL PROJECTS UNDER CONSTRUCTION DURING FISCAL YEAR 
1987 
Fiscal Year 
Fiscal Placed in Completed or 
Year Useful Scheduled for 
Project Started Operation Completion Nature of Project 
Enderlin, Maple River, ND (Sec 205)................................ 
Euclid Creek, OH (Sec 205).............................................. 
Evansville, IN .............................................. .................... 
Fairfield Vicinity Streams, CA.......................................... 
Falls Lake, NC .................................................................. 
Fire Island Inlet to Montauk Point, NY ............................ 
(Rem ainder)...................................... ......................... 
Fountain Creek, Pueblo, CO............................................. 
Four Rivers Basin, FL ..................................................... 
Galena Emergency Bank Stabilization, AK...................... 
Goodfood Creek, Chickasaw Co., MS................................. 
Great Fa;;s. M T................................................................. 
Greenwood Bendway, Site 3, MS....................................... 
Greenwood Bendway, Site 4, MS....................................... 
Greenwood Bendway, Site 5, MS....................................... 
Gult Street and Trumbull Avenue, Milford, CT (Sec 14). 
Hanover, Hennepin County, MN (Sec 14)......................... 
Hooverson Heights, WV (Sec 14)....................................... 
Joe Pool Lake, TX............................................................ 
Kaskaskia Island Drainage & Levee Dist., IL.................. 
Kickapoo River, Gays Mills, WI (Sect 14)......................... 
Kimsey Creek, Holt Co., Casteel Bridge (Sec 14)............. 
Lake Chicot Pumping Plant, AR....................................... 
Lake Darling, Souris River, ND........................................ 
Lake Erie, SR 531, Geneva, OH (Sec 14).......................... 
Lake Michigan, Cleveland, WI........................................... 
Lake Michigan, Lake Forest, IL (Sec 14)......................... 
Lake Michigan, Edgewater/Forest Park, IL.................... 
Lake Michigan, Waterworks Facility, Cudahy, WI.......... 
Lake Pontchartrain, LA.................................................... 
Lake Pulaski, Wright County, MN (Sec 205).................... 
Larose to Golden Meadow, LA........................................... 
Lavon Lake Modification and East Fork Channel 
Im provem ent, TX..................................................... 
Lead Bayou, MS (Sec 205).................................................. 
Leaf & Bowie Rivers, Hattiesburg, MS............................. 
Levee Unit 5, Wabash River, IN........................................ 
Levisa & Tug Forks of the Big Sandy River & 
Cumberland River, KY, WV & VA............................. 
Lewis Brank (Mile 2.0 to 4.0) County Rd, Houston Co., 
T N ............................................................................... 
Liberty State park, Levee and Seawall, NJ (Sec 205)...... 
Little Blue River, Marshall Col, KS FAS Road 1108 
(Sec 14)..................................................................... 
1982 
1983 
1939 
1986 
1973 
1963 
1963 
1987 
1966 
1987 
1986 
1982 
1986 
1987 
1987 
1986 
1986 
1986 
1975 
1980 
1986 
1986 
1981 
1985 
1986 
1986 
1986 
1987 
1986 
1967 
1986 
1972 
1970 
1982 
1986 
1964 
1981 
1986 
1987 
1986 
Little Blue River, Adams Co., NE, Overy Bridge (Sec 14)1986 
Little Blue River, Adams Co., NE, Pauline Bridge 
(Sec 14).............................................. ....................... 1986 
1986 
1986 
1983 
1988 
1987 
1987 
1987 
1986 
1987 
1987 
1987 
1987 
1976 
1969 
1988 
1988 
1993 
1989 
1990 
Indefinate 
Indefinate 
1990 
1990 
1988 
1987 
1987 
1988 
1988 
1988 
1987 
1988 
1987 
1990 
1986 
1987 
1987 
1985 
1991 
1987 
1987 
1987 
1988 
1987 
Indefinate 
1988 
1992 
1985 
(mod) 
1988 
1988 
1984 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Reservoir 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Riverbank Protection 
Bridge Protection 
Local Protection 
Riverbank Protection 
Riverbank Protection 
Riverbank Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Reservoir 
Local Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Reservoir 
Streambank Protection 
Shoreline Protection 
Shoreline Protection 
Shoreline Protection 
Shoreline Protection 
Local Protection 
Local Protection 
Local Protection 
Reservoir and Channel 
Improvement 
Local Protection 
Bridge Protection 
Local Protection 
Indefinate Local Protection 
1987 
1986 
1987 
1987 
1988 
1987 
1987 
1987 
Streambank Protection 
Shore Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
B-3

APPENDIX B (Continued) 
FLOOD CONTROL PROJECTS UNDER CONSTRUCTION DURING FISCAL YEAR 
1987 
Fiscal Year 
Fiscal Placed in Completed or 
Year Useful Scheduled for 
Project Started Operation Completion Nature of Project 
Little Blue River, Adams Co., NE< Pimpel 
Bridge (Sec 14)........................................................... 1986 
Little Blue River Channel, MO.......................................... 1975 
Little Blue River Lakes, MO............................................. 1978 
Little Dell Lake, UT.......................................................... 1986 
Little Kanawha River, Glenville, WV (Sec 14)................ 1986 
Little Quilcene River, Near Quilcene, WA (Sec 14).......... 1987 
Little Red River, Clinton, AR (Sec 205)............................. 1985 
Long Branch Lake, MO..................................................... 1973 
Los Coches Creek, San Diego County CA (Sec 205)......... 1986 
Lower Columbia River Bank Protection, OR and WA..... 1961 
Lower San Joaquin River, CA (Snagging & Clearing)..... 1985 
Lytle & Warm Creeks, Santa Ana River Basin, CA........ 1973 
Machjias River, Machias, ME (Sec 14).............................. 1987 
Mahoning River, Highway 139 A, OH (Sec 14).............. 1985 
Mahoning River, Warren, TWP, OH (Sec 14)................ 1986 
Mankato and N. Mankato, MN.......................................... 1971 
Marginal Way, Oguinquit, ME (Sec 14)............................. 1986 
Marne Creek, Yankton, SD (Sec 14).................................. 1986 
Martin Creek, Prentiss Co., MS........................................ 1986 
Martins Fork Lake, KY..................................................... 1973 
M auvaise Terre, IL.......................................................... 1985 
McGee Creek Drainage and Levee Dist., IL..................... 1979 
Medicine Bow River, Elk, MT, WY (Sec 14)...................... 1986 
Merced County Streams, CA.............................................. 1986 
Middle River at Argyle, MD (Sec 205)............................... 1985 
M ilan, IL ............................................................................ 1980 
Mill Brook, Brownsville, VT (Sec 14)................................ 1986 
M ill Creek, OH .................................................................. 1981 
Missouri River Levee System, IA, NE, KS, and MO........ 1948 
Miss. River Channel Improvements (AR, IL, KY, LA, 
MI, MO & TN)............................................................ 1928 
Miss. River Levees............................................................. 1928 
Monongahela River, Granville, WV (Sec 14)..................... 1986 
Mt. St. Helens Sediment Control, WA.............................. 1986 
Mt. St. Helens & Vicinity, WA........................................... 1983 
Muddy Creek, Syracuse, NE (Sec 14)................................ 1984 
Mudline to Pineville, MS.................................................. 1984 
Murder & Burnt Corn Creeks, Brewton, AL..................... 1986 
Muskingham River Lakes, OH.......................................... 1976 
Muskingum River Lakes, OH 
(Dam Safety Assurance)........................................... 1982 
New Orleans to Venice, LA.............................................. 1969 
Newark, OH....................................................................... 1976 
Nodaway River, Andrew Co., MO, Rad T (Sec 14).......... 1985 
Nodaway River, Andrew & Holt Co., MO, Fillmore 
Bridge (Sec 14)........................................................... 1986 
Noxubee River Relief Bridge, Shuqualak, MS.................. 1986 
Ofu Airstrip, American Samoa (Sec 14)............................. 1986 
1987 1987 
1987 
1989 
1991 
1987 
1988 
1986 1987 
1980 Indefinate 
1987 1990 
Indefinate 
1988 
1987 1987 
1987 1987 
1985 1985 
1987 
1989 
1987 1987 
1987 1988 
1987 
1978 1982 
1987 
1985 
1986 1987 
Indefinate 
1989 
1988 
1987 1987 
1999 
Indefinate 
(4) 
(4) 
1985 
1985 
1986 
1986 
1987 
2010 
2008 
1987 
Indefinate 
1988 
1988 
1985 
1988 
1988 
1995 
Indefinate 
1989 
1987 
1987 
1987 
1987 
Streambank Protection 
Local Protection 
Reservoir 
Reservoirs 
Streambank Protection 
Streambank Protection 
Local Protection 
Reservoir 
Local Protection 
Local Protection 
Snagging and Clearing 
Local Protection 
Shoreline Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Reservoir 
Local Protection 
Local Protection 
Streambank Protection 
Reservoirs 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Channel Improvement 
Main Line Levees 
Streambank Protection 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Major Rehabilitation 
Modernization of Dams 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Shoreline Protection 
B-4

APPENDIX B (Continued) 
FLOOD CONTROL PROJECTS UNDER CONSTRUCTION DURING FISCAL YEAR 
1987 
Fiscal Year 
Fiscal Placed in Completed or 
Year Useful Scheduled for 
Project Started Operation Completion Nature of Project 
Ohio River, Chester, WV (Sec 14)...................................... 
Oil Creek Ice Control Project, Oil City, PA....................... 
Osage River, Miller Co., MO, Road HH (Sec 14)............... 
Otter Creek, Shannon Hills, AR (Sec 205)....................... 
Owyhee River, OR (Sec 208).............................................. 
Paintsville Lake, KY.......................................................... 
Pajano River, CA............................................................... 
Panola-Quitman Item C, MS............................................ 
Papillion Creek and Tributaries Lake, NE....................... 
Passaic River Basin, NJ and NY (Sec 205)....................... 
Patoka Lake, IN............................................................... 
Paw Paw, MI (Sec 205)..................................................... 
Pawtuxet River, Warwick, RI (Sec 205)............................ 
Pearl River, M S.................................................................. 
Pelucia Creek, Item 1, MS................................................ 
Pelucia Creek, Item 1A, MS....................... ......... 
Perkiomen Creek, PA........................................................ 
Perry County L & D Nos. 1, 2, 3, MO................................ 
Phoenix, AZ, and Vicinity (including New River)............. 
Platte River, Ashland, NE (Sec 14).................................... 
Pleasant Point, Perry, ME (Sec 14).................................. 
Plum Creek, Penn Hills, PA (Sec 14)................................ 
Point Place, OK .................................................................. 
Poquessing Creek, Bucks Co., PA..................................... 
Porter Bayou, MS (Sec 205).............................................. 
Portugues and Bucana Rivers, PR.................................... 
Presque Isle Peninusula, PA.............................................. 
Pt. Leflore, M S ....................................... ........................ 
R. D. Bailey Lake, WV...................................................... 
Rapidan River, Orange, VA (Sec 14)................................. 
Raritan Bay and Sandy Hook Bay, NJ, Matawan 
and Union Beach Sections.......................................... 
Ray Roberts Lake, TX....................................................... 
Redbank & Fancher Creeks, CA........................................ 
Redbird Creek, Holt Co., NE (Sec 14)................................ 
Red River below Denison Dam, TX.................................... 
Red River Emergency Bank Protection............................ 
Red River of the North at Argusville, ND (Sec 205)......... 
Reserve Sewage Lagoon, NM (Sec 14)............................... 
Roberto Clemente Park, Pittsburgh, PA (Sec 14)............. 
Rochester, M N ................................................................... 
Rockford, IL (Kent Creek)................................................. 
Root Creek, Bolivar, NY (Sec 205).................................... 
Rosewood Beach, Bathhouse , IL (Sec 14)....................... 
Sacramento River Bank Protection, CA........................... 
Sacramento River, Chico Landing to Red Bluff, CA........ 
Sacramento River Flood Control, CA................................ 
Sacramento River, Major and Minor Tributaries, CA...... 
Saginaw River, MI............................................................. 
San Antonio channel Improvement, TX........................... 
1983 
1987 
1986 
1984 
1986 
1973 
1987 
1984 
1972 
1987 
1972 
1985 
1982 
1984 
1985 
1987 
1986 
1977 
1973 
1986 
1986 
1983 
1982 
1987 
1982 
1975 
1975 
1985 
1967 
1983 
1965 
1975 
1987 
1984 
1948 
1971 
1985 
1986 
1983 
1987 
1979 
1979 
1986 
1963 
1963 
1918 
1949 
1965 
1957 
1984 
1986 
1984 
1983 
1974 
1978 
1987 
1987 
1985 
1987 
1987 
1984 
1986 
1975 
1986 
1986 
1987 
1989 
1984 
1984 
1987 
1979 
1984 
1989 
1987 
1986 
1987 
1991 
1988 
1986 
1991 
1988 
1983 
1987 
1987 
1985 
1987 
1987 
1987 
1985 
1991 
1987 
1987 
1984 
1987 
1988 
1988 
1993 
1989 
1986 
1988 
1987 
Indefinate 
1991 
1993 
1987 
1989 
Indefinate 
1988 
1987 
1984 
1995 
1988 
1984 
1987 
1991 
Indefinate 
1989 
1988 
1992 
1991 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Snagging and Clearing 
Reservoir 
Local Protection 
Local Protection 
Reservoirs 
Local Protection 
Reservoir 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Beach Replentishment 
Streambank Protection 
Reservoir 
Streambank Erosion 
Local Protection 
Reservoir 
Reservoir 
Streambank Protection 
Local Protection 
Streambank Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Shoreline Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
B-5

APPENDIX B (Continued) 
FLOOD CONTROL PROJECTS UNDER CONSTRUCTION DURING FISCAL YEAR 
1987 
Fiscal Year 
Fiscal Placed in Completed or 
Year Useful Scheduled for 
Project Started Operation Completion Nature of Project 
San Gabriel River, TX..................................................... 
Sardis Lake, OK....................................... ....................... 
Saxis Island, Accomack Cnty, VA..................................... 
Saylorville Lake, IA ......................................................... 
Scotts Creek, newberry, SC (Sec 205)................................ 
Scottsville, VA ................................................................... 
Seneca Lake, Sewage Treatment Plant, Watkins Glen, 
N Y (Sec 14)................................................................. 
Seneca River, Sewage Treatment Plant, Seneca Falls, 
NY (Sec 141)............................................................... 
Sheyenne River, Valley City, ND (Sec 14)........................ 
Sicily Island, LA, Levee................................................... 
Skiatook Lake, OK..................................... ..................... 
Smithville Lake, MO.......................................................... 
Sope Creek, Marietta, GA.................................................. 
Souris River, Velva, ND (Sec 141)...................................... 
South Creek, Martinsburg, NE (Sec 14)............................ 
South Fork, Boise River, ID (Sec 208)............................... 
South Platte River, Ft. Lupton, CO (Sec 14).................... 
South Platte River, Goodrich, CO (Sec 14)........................ 
South Platte River, Morgan Co., CO (Sec 141)................... 
South Platte River, Weldona, CO (Sec 14)........................ 
South Quincy, IL........................................ ..................... 
South River, Conway, MA (Sec 14).................................... 
Southwestern Jefferson County, KY................................. 
Spokane River, Spokane, WA (Sec 141).............................. 
Steele Bayou, MS....................................... ..................... 
St. Francis Basin...................................... ....................... 
Stonewall Jackson Lake, WV............................................ 
Stuart, Patrick Co., VA (Sec 2051)...................................... 
Swan Creek, Taney County, MO (Sec 14)......................... 
Sweetwater River, CA..................................................... 
Tallabinella Creek, Chickasaw Co., MS............................ 
Tallahatchie River, Site 1, MS........................................... 
Taylors Bayou, TX................................... ........................ 
Taylorsville Lake, KY....................................................... 
Tennessee River (Mile 254) City Duck, Sheffield, AL.... 
Tennessee River (Mile 67.0) Paris Landing State Park, 
T N ............................................... ................................. 
1973 
1976 
1986 
1965 
1986 
1986 
1987 
1986 
1986 
1983 
1974 
1974 
1986 
1986 
1985 
1984 
1986 
1985 
1985 
1984 
1987 
1986 
1974 
1987 
1966 
1938 
1977 
1986 
1984 
1984 
1986 
1988 
1982 
1974 
1986 
1986 
Tennessee River (Mile 650) Downtown Is. Airport, TN....1986 
Tensas Cocodrie Pumping Plant, LA 11........................... 1983 
Tensas Cocodrie, LA, Levee (5)...................................... 1974 
Texas City and Vicinity, TX (1958 authorization)........... 1962 
Tombigbee River, Hwy. 39 Bridge, Gainesville, AL......... 1986 
Tombigbee River Tributaries, AL and MS....................... 1965 
Trout Run, Portage Borough, PA (Sec 14)........................ 1984 
Turkey Creek, Fillmore Co., NE, Bridge 123 (Sec 14)...... 1986 
Turkey Creek, Fillmore Co., NE Bridge 385 (Sec 14)....... 1986 
19801 
1983 
1987 
1977 
1987 
1987 
1987 
1985 
1982 
1987 
1987 
1987 
1987 
1987 
1987 
1983 
(4) 
1986 
1983 
1987 
1984 
1987 
1987 
19842 
1990 
1987 
Indefinate 
1988 
1988 
1987 
1987 
1988 
2010 
1988 
1986 
1988 
1988 
1987 
1985 
1987 
1987 
1987 
1987 
1990 
1987 
1989 
1988 
1995 
1999 
1988 
1988 
1986 
Indefinate 
1987 
1988 
1992 
1990 
1987 
1987 
1987 
1987 
1989 
1987 
1988 
Indefinate 
1984 
1987 
1987 
Reservoir 
Reservoir 
Streambank Protection 
Reservoir 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Reservoir 
Reservoir 
Local Protection 
Streambank Protection 
Streambank Protection 
Snagging and Clearing 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Streambank Protection 
Local Protection 
Streambank Protection 
Local Protection 
Tributary levees & channels 
Reservoir 
Local Protection 
Streambank Protection 
Local Protection 
Bridge Protection 
Riverbank Protection 
Local Protection 
Reservoir 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Riverbank Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
B-6

APPENDIX B (Continued) 
FLOOD CONTROL PROJECTS UNDER CONSTRUCTION DURING FISCAL YEAR 
1987 
Fiscal Year 
Fiscal Placed in Completed or 
Year Useful Scheduled for 
Project Started Operation Completion Nature of Project 
Tynes Branch, Houston School Road Bridge, Itawamba 
Co., M S........................................................................ 1986 
Upper Scioto River, Marion County, OH (Sec 205)........... 1986 
Upper Yazoo Projects, MS................................................. 1976 
U.S. Hwy. 11 Bridge, Fosters, AL (Sec 14).......................1985 
U.S. Hwy. 82 Bridge, Columbus, MS (Sec 14).................. 1985 
U.S. Interstate 59 Bridges, Fosters, AL (Sec 14)............. 1985 
Valley Creek, AL (Sec 14).................................................. 1985 
Vermillion River, WWTP, SD (Sec 14).............................. 1985 
Vince and Little Vince Bayous, TX.................................... 1968 
Wakarusa River, Baldwin City, KS, City Waterline 
(Sec 14)....................................................................... 1986 
Walkill River (Black Dirt Area), NY (Sec 2050............... 1984 
W alnut Creek, CA............................................................... 1964 
Warner Road, Mississippi River, St. Paul, MN (Sec 14).. 1986 
West Little Pine Creek, Etna, PA.................................. . 1986 
West Magnesia Canyon Channel, CA (Sec 205)............... 1985 
West Papillion Creek, Douglas, Co., NE (Sec 14)............ 1985 
West Tennessee Tributarieas............................................... 1960 
Wheeler Creek, Gainesville, TX (Sec 205)....................... 1983 
White River, Batesville, AR (Sec 14)................................ 1984 
White River, Jacksonport, AR (Sec 205)........................... 1984 
Wigle Creek, Homer, NE (Sec 14)...................................... 1985 
Wildcat and San Pablo Creeks, CA.................................... 1986 
Wilamette River Basin Bank Protection, OR................... 1938 
William H. Harsha Lake, OH........................................... 1970 
W inona, M N ........................................................................ 1979 
Wood River Drainage and Levee District, IL................... 1953 
Wyoming Valley, PA.......................................................... 1983 
Yankee Creek, Johnson Co., NE, Vesta Bridge 
(Sec 14)......................................................................... 1986 
Yankee Creek, Johnson Co., NE, West Tecumseh 
Bridge (Sec 14 ..................................... ....................... 1986 
Yatesville Lake, KY................................... ...................... 1964 
Yonkers, NY................................................ ..................... 1975 
1986 
1986 
1986 
1986 
1987 
1986 
1987 
1987 
1986 
(4) 
1094 
1986 
1986 
1986 
1978 
1985 
1962 
1976 
1986 
1986 
1987 
1987 
2013 
1986 
1986 
1987 
1986 
1987 
1988 
1987 
1988 
1900 
1987 
1987 
1988 
1988 
2003 
1984 
1986 
1986 
1986 
1990 
Indefinate 
1985 
1988 
1986 
1986 
1987 
1987 
1992 
1985 
Bridge Protection 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Sewerline Protection 
Streambank Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Streambank Protection 
Tributary Channels 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Reservoir 
Local Protectin 
Local Protection 
Rehabilitation of levee system 
Streambank Protection 
Streambank Protection 
Reservoir 
Local Protection 
1Granger Dam & Lake Georgetown - Complete FY 83 
2 South Fork - Constuction deferred indefinately, work on Reevaluation Report only 
3Completion of Stage I (Truscott facilities) only. Stage II (Ross facilities) indefinate 
4Project was in useful operation before Corps started working on it. Work consists primariliy of improvements to existing 
local interesst channel and levees 
5Project consists of Levee upgrade and enlargement 
B-7

APPENDIX C 
NAVIGATION LOCKS AND DAMS OPERABLE SEPTEMBER 20,1987 
Locks Dame Authorized Channel 
Miles Width Available Lift at Depth on Sills 
Above Community of Length for Normal Length Year Length Depth Width 
Project Mouth in Vicinity Chamber Width Pool Level Upper Lower Typel (feet) Opened (miles) (feet) (feet) 
Alabama-Coosa Rivers, AL 
Claiborne Lock & Dam 
Millers Ferry Lock and 
Dam 
Jones Bluff Lock and Dam 
Allegheny River, PA and NY 
Lock and Dam No. 2 
Lock and Dam No. 3 
Lock and Dam No. 4 
Lock and Dam No. 5 
Lock and Dam No. 6 
Lock and Dam No. 7 
Lock and Dam No. 8 
Lock and Dam No. 9 
Apalachicola, Chattahoochee, 
and Flint Rivers, GA, AL 
and FL 
Jim Woodruff Lock 
and Dam 
George W. Andrews 
Lock and Dam 
Walter F. George 
Lock and Dam 
Atlantic Intracoastal 
Wasterway 
Albemarle and Chesapeake 
Canal Route: 
Great Bridge Lock 
Dismal Swamp Canal 
Route: 
Deep Creek Lock 
South Mills Lock 
Bayou Teche, LA 
Berwick Lock 
Keystone Lock 
Black Rock Channel and 
Tonawonda Harbor, NY 
Black Rock Lock 
Black Warrior, Warrior 
and Tombighee Rivers, AL 
Coffeeville (Jackson) 
Lock and Dam 
Demopolis Lock and Dam 
Armstead I. Selden Lock 
and Dam 
Win. Bacon Oliver 
Lock and Dam 
Holt Lock and Dam 
John Hollis Bankhead 
Lock and Dam (New Lock) 
Canaveral Harbor, FL 
Canaveral Lock 
Cape Fear River, NC 
Lock and Dam No. 1 
Lock and Dam No. 2 
William O. Husks 
Lock and Dam 
Central and Southern Florida 
S-61 Lock 
S-65 Lock 
S-65A Lock 
S-65B Lock 
S-65C Lock 
S-65D Lock 
81.82 Claiborne, AL 
142.32 Camden, AL 
254.42 Benton, AL 
6.7 Aspinwall, PA 
14.5 Cheswick, PA 
24.2 Natrona, PA 
30.4 Freeport, PA 
36.3 Clinton, PA 
45.7 Kittanning, PA 
52.6 Templeton, PA 
62.2 Rimer, PA 
84 600 30 16 13 Movable 3,1603 1973 
84 600 45 16 13 Movable 9,9003 1969 
84 600 45 16 13 Movable 14,9623 1974 
56 
56 
56 
56 
56 
56 
56 
56 
107.64 Chattahoochee, FL 82 
182.85 Columbia, GA 82 
182.85 Fort Gaines, GA 82 
11.56 Great Bridge, VA 72 
10.66 Deep Creek, VA 52 
33.26 South Mills, NC 52 
1.5
3 
Berwick, LA 
72.53 New Iberia, LA 
0.0 Buffalo, NY 
116.610 Coffeeville, AL 
213.210 Demopolis, AL 
261.110 Eutaw, AL 
338.110 Tuscaloosa, AL 
347.010 Holt, AL 
365.1 Adger, AL 
2.7 Cocoa, FL 
67.0 Kings Bluff, NC 
99.0 Browns Landing, NC 
123.0 Tolars Landing, NC 
360 
360 
360 
360 
360 
360 
360 
360 
11 
13 
10 
12 
12 
13 
18 
22 
11 
12
9 
10 
11 
11 
14 
11 
12 Fixed 
11 Fixed 
10 Fixed 
11 Fixed 
11 Fixed 
10 Fixed 
10 Fixed 
11 Fixed 
1,393 193420 
1,436 193420 
876 1927 
780 1927 
1,140 1928 
916 1930 
984 1931 
950 1938 
450 33 14 14 Movable 5,924 1957 
450 25 19 13 Movable 620 1963 
450 88 18 13 Movable 13,371 1963 
530 3 167 167 None 1932 
300 12 127 127 None 
300 12 12 
7 127 None 
45 307 79 
36 162 9 
97
9 
97 None 
8 Fixed 
60.5 9 200 
103.1 9 200 
88.0 9 200 
7.8 9 200 
9.7 9 200 
6.2 9 200 
5.9 9 200 
9.4 9 200 
6.9 9 200 
9.6 9 200 
9.8 9 200 
46.7 6 100 
28.5 6 100 
85.0 6 100 
12 90 
1940 6 50 
1941 6 
1950 
175 1913 
68 625 5 21.6 21.6 None 1914 
110 600 33 13 13 Movable 1,185 1965 
110 600 40 13 13 Fixed 1,485 1962 
110 600 22 13 13 Movable 1,832 1962 
95 460 28 12 12 Fixed 700 1940 
110 600 64 19 13 Movable 1,138 1969 
50 
8 80 
34.5 6 80 
7.1 21 200 
96.6 9 200 
47.9 9 200 
77.0 9 200 
8.9 9 200 
18.1 9 200 
110 600 68 13 13 Fixed 1,170 1975 42.7 9 200 
90 
40 
40 
40 
0.0 St. Cloud, FL 30 
56.0 Frostproof, FL 30 
46.0 Avon Park, FL 30 
32.0 Sebring, FL 30 
25.0 Sebring, FL 30 
16.0 Okeechobee, FL 30 
600 3 14 14 None 1965 12 125 
200 11 9 9 Fixed 275 1915 32.0 8 100 
200 9 12 12 Fixed 229 1917 24.0 8 100 
300 9 9 9 Fixed 220 1935 20.0 8 100 
90 
90 
90 
90 
90 
90 
6 None 
6 None 
6 None 
6 None 
6 None 
6 None 
1963 
1964 
1967 
1965 
1965 
1964 
8 
28.0 3 
10.0 3 
14.0 3 
7.0 3 
9.0 3 
20 
30 
30 
30 
30 
30 
C-1

APPENDIX C (Continued) 
NAVIGATION LOCKS AND DAMS OPERABLE SEPTEMBER 20, 1987 
Locks Dams Authorized Channel 
Miles Width Available Lift at Depth on Sills 
Above Community of Length for Normal Length Year Length Depth Width 
Project Mouth in Vicinity Chamber Width Pool Level Upper Lower Typel (feet) Opened (miles) (feet) (feet) 
S-65E Lock 
S-308B 
S-310 
Chicago Harbor, IL 
Chicago Lock 
Columbia River, OR and WA 
Bonneville Lock and Dam 
The Dalles Lock and Dam 
John Day Lock and Dam 
McNary Lock and Dam 
Cross-Florida Barge Canal 
Inglis Lock, Dam 
and Spillway 
Eureka Lock and Dam 
Harry H. Buckman Lock 
Cumberland River, KY 
and TN 
Barkley Dam 
Cheatham Lock and Dam 
Old Hickory Lock and Dam 
Cordell Hull Dam 
and Reservoir 
Fox River, WI 
DePere Lock 
DePere Dam 
Little Kaukauna Lock 
Little Kaukauna Dam 
Rapide Croche Lock 
Rapide Creche Dam 
Kaukauna Fifth Lock 
Kaukauna Fourth Lock 
Kaukauna Third Lock 
Kaukauna Second Lock 
Kaukauna First Lock 
Kaukauna Dam 
Kaukauna Guard Lock 
Little Chute combined Lock 
Lower 
Upper 
Little Chute Second Lock 
Little Chute First 
(Guard) Lock 
Little Chute Dam 
Cedars Lock 
Cedars Dam 
Appleton Fourth Lock 
Appleton Lower Dam 
Appleton Third Lock 
Appleton Second Lock 
Appleton First Lock 
Appleton Upper Dam 
Menasha Lock 
Menasha Dam 
Freshwater Bayou, LA 
Freshwater Bayou Lock 
Green and Barren Rivers, KY 
Green River. 
Lock and Dam No. 1 
Lock and Dam No. 2 
Gulf Intracoastal Waterway 
Inner Harbor Navigation 
Channel Lock 
Harvey Lock 
Algiers Lock 
Bayou Bouef Lock 
Bayou Sorrel Lock 
Port Allen Lock 
12.0 Okeechobee, FL 30 
38.7 Port Mayaca, FL 56 
0.0 Clewiston, FL 50 
0.0 Chicago, IL 
146.0 Bonneville, OR 
190.0 The Dalles, OR 
215.0 Rufus, OR 
292.0 Umatilla, OR 
168.611 Inglis, FL 
20.0 Sparr, FL 
90.4 Palatka, FL 
90 
400 
60 
5 
14
5 
6 
14 
13 
6 None 
14 Movable 
13 Movable 
80 600 4 23 23 None 
76 
86 
86 
86 
84 
84 
84 
30.6 Kuttawa, KY 110 
148.7 Ashland City, TN 110 
216.2 Old Hickory, TN 84 
313.5 Carthage, TN 84 
7.1 DePere, WI 
7.2 DePere, WI 
13.0 DePere, WI 
13.1 DePere, WI 
19.2 Wrightstown, WI 
19.3 Wrightstown, WI 
22.8 Kaukauna, WI 
23.1 Kaukauna, WI 
23.3 Kaukauna, WI 
23.4 Kaukauna, WI 
23.6 Kaukauna, WI 
24.0 Kaukauna, WI 
24.0 Kaukauna, WI 
25.4 Little Chute, WI 
25.4 Little Chute, WI 
26.4 Little Chute, WI 
26.5 Little Chute, WI 
26.6 Little Chute, WI 
27.3 Little Chute, WI 
27.4 Little Chute, WI 
30.7 Appleton, WI 
30.9 Appleton, WI 
31.3 Appleton, WI 
31.6 Appleton, WI 
31.9 Appleton, WI 
32.2 Appleton, WI 
37.8 Menasha, WI 
37.8 Menasha, WI 
36 
36 
36 
36 
37 
31 
35 
35 
40 
35 
36 
35 
35 
35 
35 
35 
35 
34 
34 
19.08 Intracoastal City, LA 84 
9.1 Spottsville, KY 84 
63.1 Calhoun, KY 84 
92.612 New Orleans, LA 75 
98.312 Harvey, LA 75 
88.012 Algiers, LA 75 
93.3 Morgan City, LA 75 
131.013 Plaquemine, LA 56 
228.512 Port Allen, LA 84 
500 
675 
675 
675 
600 
600 
600 
800 
800 
400 
65 
88 
110 
75 
28 
20 
20 
57 
26 
60 
32 
15 
15 
15 
18 
14 
14 
11 
14 
14 
24 Movable 
15 Movable 
15 Movable 
20 Movable 
1964 4.0 3 30 
1977 5.0 8 100 
1980 .5 6 50 
1939 .15 21 470 
2,680 1938 
8,735 1957 
5,900 1968 
7,365 1953 
47.5 27 300 
25,0 14 250 
76.0 14 250 
64.0 14 250 
15 Movable 5,100 1968 11.0 12 150 
Movable 3,830 1971 12 150 
15 None 1972 21.2 12 150 
13 Movable 9,959 1964 118.1 9 150 
12 Movable 801 1959 67.5 9 150 
10 Movable 3,605 1957 97.3 9 150 
400 59 14 13 Movable 1,138 1973 71.9 9 150 
146 
146 
146 
144 
144 
144 
144 
144 
147 
144 
144 
144 
144 
144 
145 
145 
144 
9
7
8
9 
10 
10 
10 
11
9 
11 
11 
14
7 
10
8
9 
10 
10
8 
10 12 
8 10 
9 10 
7 9 
7 6 
7 6 
6 6 
7 6 
600 16 
1936 
Movable 986 1929 
1938 
Movable 588 1926 
1934 
Movable 461 1930 
1898 
1879 
1879 
1903 
1883 
Movable 603 1931 
1891 
1879 
1879 
1881 
1904 
Movable 562 1932 
1888 
Movable 654 1933 
1907 
Movable 549 1934 
1900 
1901 
1884 
Movable 691 1940 
1899 
Movable 401 1937 
16 None 
5.9 6 100 
6.2 6 100 
3.6 6 100 
0.3 6 100 
0.2 6 100 
0.1 6 100 
0.2 6 100 
0.4 6 100 
1.4 6 100 
6 100 
6 100 
1.0 6 100 
0.7 6 100 
3.4 6 100 
0.6 6 100 
0.3 6 100 
0.3 6 100 
5.1 6 100 
28.3 6 100 
401 1968 12 125 
600 12 12 11 Fixed 482 1956 54.0 9 200 
600 14 15 12 Fixed 519 1956 45.4 9 200 
640 
425 
797 
1,158 
800 
1,198 
99 
109 
109 
69 
109 
45 
317 
127 
137 
137 
147 
137 
317 None 
127 None 
137 None 
137 None 
147 None 
147 None 
1923 
1935 
1956 
1956 
1952 
1961 
12 150 
12 125 
16 150 
16 150 
12 125 
12 125 
C-2

APPENDIX C (Continued) 
NAVIGATION LOCKS AND DAMS OPERABLE SEPTEMBER 20, 1987 
Locks Dame Authorized Channel 
Miles Width Available Lift at Depth on Sills 
Above Community of Length for Normal Length Year Length Depth Width 
Project Mouth in Vicinity Chamber Width Pool Level Upper Lower Typel (feet) Opened (miles) (feet) (feet) 
Vermilion Lock" 
Calcasieu Lock 
Brazos River Floodgates 
Colorado River 
East Lock 
West Lock 
Hudson River, NY 
Troy Lock and Dam 
Illinois Waterway, IL 
LaGrange Lock and Dam 
Peoria Lock and Dam 
Starved Rock Lock 
and Dam 
Marseilles Lock 
Marseilles Dam 
Dresden Island 
Lock and Dam 
Brandon Road Lock 
and Dam 
Lockport Lock 
Thomas J. (YBrien 
Lock and Dam 
Inland Route, MI 
Crooked River 
Lock and Weir 
Kanawha River, WV 
Winfield Lock and Dam 
Marmet Lock and Dam 
London Lock and Dam 
Kaskaskia River, IL 
Kaskaskia Lock and Dam 
Kentucky River, KY 
Lock and Dam No. 1 
Lock and Dam No. 2 
Lock and Dam No. 3 
Lock and Dam No. 4 
Lock and Dam No. 5 
Lock and Dam No. 624 
Lock and Dam No. 724 
Lock and Dam No. 824 
Lock and Dam No. 924 
Lock and Dam No. 1024 
Lock and Dam No. 1124 
Lock and Dam No. 1224 
Lock and Dam No. 1324 
Lock and Dam No. 1424 
Lske Washington Ship Canal 
Kiram M. Chittenden Lock 
Large Lock 
Small Lock 
McClellan-Kerr Arkansas 
River Navigation System, 
AR and OK 
Norell Lock and Dam 
Lock No. 2 
Dam No. 2 
Lock and Dam No. 3 
Lock and Dam No. 4 
Lock and Dam No. 5 
David D. Terry Lock 
and Dam 
Murray Lock and Dam 
Toad Suck Ferry Lock 
and Dam 
162.713 
238.513 
404.113 
Abbeville, LA 56 
Lake Charles, LA 75 
Freeport, TX 75 
1,200 39 117 
1,205 69 137 
157 
117 
137 
157 
None 
None 
None 
444.8 Matagorda, TX 75 1,200 59 157 15 None 
444.8 Matagorda, TX 75 1,200 59 157 157 None 
153.8 Troy, NY 
1934 
1950 
1943 
1954 
1954 
16 
16 
12 
200 
200 
125 
12 125 
12 125 
45 493 17 16 13 Fixed 1,495 1917 2.2 14 200 
80.2 Beardstown, IL 110 600 10 16 13 Movable 1,066 1939 77.5 9 300 
157.7 Peoria, lL 110 600 11 16 12 Movable 536 1939 73.3 9 300 
231.0 Uitca, IL 
244.6 Marseilles, IL 
247.0 Marseilles, IL 
271.5 Morris, IL 
110 600 19 17 14 Movable 1,280 1933 13.6 9 
110 600 24 19 14 1933 26.9 9 
Movable 819 1933 24.6 
300 
300 
110 600 22 17 12 Movable 1,616 1933 14.5 9 300 
286.0 Joliet, IL 110 600 34 18 14 Movable 2,373 1933 5.1 9 300 
291.1 Lockport, IL 110 600 40 12 15 None 1933 9 300 
326.5 Chicago, IL 110 1,000 2 14 14 Movable 257 1960 6.9 9 300 
30.0 Alanson, MI 17.8 66 1 6.9 7.9 SSP Weir 83 1967 4.0 5 30 
31.1 
67.8 
82.8 
Winfield, WV 
Marmet, WV 
London, WV 
56 
56 
56 
360 
360 
360 
28 
24 
24 
18 
18 
18 
12 
12 
12 
Movable 834 1937 36.7 9 300 
Movable 707 1934 15.0 9 300 
Movable 707 1934 7.8 9 300 
.8 Ellis Grove, IL 84 600 32 18 11 Movable 130 1973 35.0 9 225 
4.0 
31.0 
42.0 
65.0 
82.2 
96.2 
117.0 
139.9 
157.5 
176.4 
201.0 
220.9 
239.9 
249.0 
Carrolton, KY 
Lockport, KY 
Gest, KY 
Frankfort, KY 
Tyrone, KY 
High Bridge, KY 
High Bridge, KY 
Camp Nelson, KY 
Valley View, KY 
Ford, KY 
Irvine, KY 
Ravenna, KY 
Willow, KY 
Heidelberg, KY 
1.3 Seattle, WA 
1.3 Seattle, WA 
10.3 
13.3 
40.5 
50.2 
66.0 
86.3 
38 
38 
38 
38 
38 
52 
52 
52 
52 
52 
52 
52 
52 
52 
145 
145 
145 
145 
145 
147 
147 
146 
148 
148 
148 
148 
148 
148 
8 
14 
13 
13 
15 
14 
15 
19 
17 
17 
18 
17 
18 
17 
8896 
10
9
9 
11 
11
9 
10 
10 
10
9 
80 760 26 33.5 29 
28 123 26 16 16 
Arkansas Post, AR 110 
Arkansas Post, AR 110 
Arkansas Post, AR 
Grady, AR 110 
Pine Bluff, AR 110 
Rodfield, AR 110 
108.1 Little Rock, AR 110 
125.4 Little Rock, AR 110 
600 
600 
600 
600 
600 
30 
20 
20 
14 
17 
16 
18 
18 
18 
18 
15 
14 
14 
14 
14 
Fixed 
Fixed 
Fixed 
Fixed 
Fixed 
Fixed 
Fixed 
Fixed 
Fixed 
Fixed 
Fixed 
Fixed 
Fixed 
Fixed 
424 1839 
400 1939 
465 1844 
534 1844 
556 1844 
413 1891 
350 1897 
257 1900 
362 1907 
472 1907 
208 1906 
240 1910 
248 1915 
248 1917 
27.0 6 
11.0 6 
23.0 6 
17.2 6 
14.0 6 
20.8 6 
22.9 6 
17.6 6 
18.9 6 
24.6 6 
19.9 6 
19.0 6 
9.1 6 
9.6 6 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
Movable 235 1916 17.0 34 150 
Fixed 4,677 1967 
1967 
Movable 42,073 1968 
Movable 6,110 1968 
Movable 5,745 1968 
Movable 7,455 1968 
600 18 18 14 Movable 8,890 1968 
600 18 18 14 Movable 3,930 1969 
155.9 Conway, AR 110 600 16 18 14 Movable 1,580 1969 
3.0 9 
36.9 9 
15.8 9 
20.3 9 
21.8 9 
250 
250 
250 
250 
250 
17.3 9 250 
30.5 9 250 
21.0 9 250 
C-3

APPENDIX C (Continued) 
NAVIGATION LOCKS AND DAMS OPERABLE SEPTEMBER 20, 1987 
Locks Dams Authorized Channel 
Miles Width Available Lift at Depth on Sills 
Above Community of Length for Normal Length Year Length Depth Width 
Project Mouth in Vicinity Chamber Width Pool Level Upper Lower Typel (feet) Opened (miles) (feet) (feet) 
Lock and Dam No. 9 
Dardanelle Lock and Dam 
Ozark-Jetta Taylor Lock 
and Dam 
Lock and Dam No. 13 
W. D. Mayo Lock and Dam 
Robert S. Kerr Lock and 
Dam and Reservoir 
Webbers Falls Lock and 
Dam 
Chouteau Lock and Dam 
Newt Graham Lock 
and Dam 
Mississippi River 
Between Ohio and Missouri 
Rivers 
Lock and Dam No. 27 
Mississippi River Between 
Missouri River and 
Minneapolis, MN 
Locak and Dam No. 26 
Lock and Dam No. 25 
Lock and Dam No. 24 
Lock and Dam No. 22 
Lock and Dam No. 21 
Lock and Dam No. 20 
Lock and Dam No. 19 
Lock and Dam No. 18 
Lock and Dam No. 17 
Lock and Dam No. 16 
Lock and Dam No. 15 
Lock and Dam No. 14 
Lock and Dam No. 13 
Lock and Dam No. 12 
Lock and Dam No. 11 
Lock and Dam No. 10 
Lock and Dam No. 9 
Lock and Dam No. 8 
Lock and Dam No. 7 
Mississippi River (Continued) 
Between Missouri River 
and Minneapolis, MN 
Lock and Dam No. 6 
Lock and Dam No. 5A 
Lock and Dam No. 5 
Lock and Dam No. 4 
Lock and Dam No. 3 
Lock and Dam No. 2 
Lock and Dam No. 1 
St. Anthony Falls 
Lower Lock and Dam 
Upper Lock and Dam 
Monogahela River, PA 
and WV 
Locks and Dam No. 2 
Locks and Dam No. 3 
176.9 Morrilton, AR 110 
205.5 Russellville, AR 110 
256.8 Ozark, AR 110 
292.8 Fort Smith, AR 110 
319.6 Fort Smith, AR 110 
336.2 Salisaw, OK 110 
366.6 Webbers Falls, OK 110 
401.2 Muskogee, OK 110 
421.4 Inola, OK 110 
185.114 Granite City, IL 110 
202.915 Alton, IL 110 
241.415 Cap Au Gris, MO 110 
273.415 Clarksville, MO 110 
301.215 Saverton, MO 110 
324.915 Quincy, IL 110 
343.215 Canton, MO 110 
364.215 Keokuk, IA 110 
410.515 Burlington, IA 110 
437.115 New Boston, IL 100 
457.215 Muscatine, IA 110 
482.915 Rock Island, IL 110 
110 
493.115 LeClaire, IA 80 
493.315 LeClaire, IA 110 
522.515 Clinton, IA 110 
556.715 Bellevue, IA 110 
583.015 Dubuque, IA 110 
615.115 Guttenberg, IA 110 
647.915 Lynxville, IA 110 
679.215 Genoa, WI 110 
702.515 Dresbach, MN 110 
714.315 Trempealeau, WI 110 
728.515 Winona, MN 110 
738.115 Minneiska, MN 110 
752.815 Alma, WI 110 
796.915 Red Wing, MN 110 
815.215 Hastings, MN 110 
847.615 Minneapolis,, MN 56 
St. Paul 
56 
853.315 Minneapolis, MN 56 
853.915 Minneapolis, MN 56 
11.2 Braddock, PA 
23.8 Elizabeth, PA 
56 
110 
56 
600 19 18 14 Movable 1,505 1969 
600 54 18 14 Movable 1,815 1969 
600 34 18 
600 20 18 
600 20 14 
15 Movable 2,480 1969 
14 Movable 4,725 1969 
15 Movable 7,400 1970 
600 48 18 14 Movable 7,230 1970 
600 30 19 16 Movable 4,370 1970 
600 21 15 14 Movable 11,490 1970 
600 21 15 14 Movable 1,629 1970 
1,200 21 16 15 Fixed 3,240 1953 
600 24 
360 24 
600 15 
600 15 
600 10 
600 10 
600 10 
1,200 38 
600 10 
600 8 
600 9 
600 16 
360 16 
320 11 
600 11 
600 11 
600 9 
600 11 
600 8 
600 9 
600 11 
600 8 
600 7 
600 6 
600 9 
600 7 
600 8 
600 12 
500 12 
400 38 
400 38 
19 
16 
19 
19 
18 
17 
15 
15 
17 
16 
17 
27 
27 
18 
21 
19 
17 
19 
15 
16 
22 
18 
17 
18 
18 
17 
17 
22 
16 
13 
13 
10 Movable 1,725 1938 
10 
12 Movable 1,296 1939 
12 Movable 4,280 1940 
14 Movable 1,024 1938 
12 Movable 1,066 1938 
12 Movable 2,144 1936 
13 Fixed 4,434 1913 
14 Movable 1,350 1937 
13 Movable 921 1939 
12 Movable 1,099 1937 
11 Movable 1,203 1934 
11 
11 1922 
14 Movable 1,343 1939 
13 Movable 1,066 1939 
13 Movable 849 1938 
13 Movable 1,278 1937 
12 Movable 763 1937 
13 Movable 811 1937 
14 Movable 935 1937 
12 Movable 940 1937 
13 Movable 893 1936 
13 Movable 682 1936 
12 Movable 1,619 1935 
13 Movable 1,367 1935 
14 Movable 365 1938 
13 Movable 822 1931 
15 1948 
8 Fixed 574 1932 
10 1917 
400 25 14 10 Movable 188 1956 
400 49 16 14 Fixed 3,584 1963 
360 9 16 
720 9 16 
360 8 12 
28.6 9 250 
51.3 9 250 
36.0 9 250 
26.8 9 250 
16.6 9 250 
30.4 9 250 
34.8 9 250 
20.2 9 150 
23.7 9 150 
17.8 9 200 
38.5 9 200 
32.0 9 200 
27.8 9 200 
23.7 9 NS 
18.3 9 NS 
21.0 9 NS 
46.3 9 NS 
26.6 9 NS 
20.1 9 NS 
25.7 9 NS 
10.4 9 NS 
29.2 9 NS 
34.2 9 NS 
26.3 9 NS 
32.1 9 NS 
32.8 9 NS 
31.3 9 NS 
23.3 9 NS 
11.8 9 NS 
14.2 9 NS 
9.6 9 NS 
14.7 9 NS 
44.1 9 NS 
18.3 9 NS 
32.4 9 NS 
5.7 9 NS 
0.6 9 100 
3.8 9 100 
16 Fixed 748 1951 12.6 9 300 
16 195321 
12 Fixed 670 1907 17.7 9 300 
C-4

APPENDIX C (Continued) 
NAVIGATION LOCKS AND DAMS OPERABLE SEPTEMBER 20, 1987 
Locks Dame Authorized Channel 
Miles Width Available Lift at Depth on Sills 
Above Community of Length for Normal Length Year Length Depth Width 
Project Mouth in Vicinity Chamber Width Pool Level Upper Lower Typel (feet) Opened (miles) (feet) (feet) 
Locks and Dam No. 4 
Maxwell Locks and Dam 
Locks and Dam No.7 
Locks and Dam No. 8 
Morgantown Lock and Dam 
Hildebrand Lock and Darn 
Opekiska Lock and Dam 
Ohio River 
Locks and Dam No. 53 
Locks and Dam No. 52 
Smithland Locks and Dam 
Uniontown Locks and Dam 
Newburgh Locks and Dam 
Cannelton Locks and Dam 
McAlpine Locks and Dam 
Markland Locks and Dam 
Captain Anthony Meldahl 
Locks and Dam 
Greenup Locks and Dam 
Gallipolis Locks and Dam 
Racine Locks and Dam 
Belleville Locks and Dam 
Willow Island Locks 
and Dam 
Hannibal Locks and Dam 
Pike Island Locks and Dam 
New Cumberland Locks 
and Dam 
Montgomery Island Locks 
and Dam 
Dashfields Locks and Dam 
Emsworth Locks and Dam 
Okeechobee Waterway, FL 
St. Lucie Lock and Dam 
Moore Haven Lock 
Ortona Lock and Dam 
W. P. Franklin Lock and 
Control Structure 
Old River, LA 
Old River Lock 
Ouchita and Black Rivers, 
AR & LA 
Jonesville Lock and Dam 
(Black River) 
Columbia Lock and Dam 
(Ouachita River) 
56 
41.5 Monessen, PA 56 
56 
61.2 Maxwell, PA 84 
84 
85.0 Greensboro, PA 56 
90.8 Point Marion, PA 56 
102.0 Morgantown, WV 84 
108.0 Morgantown, WV 84 
115.4 Morgantown, WV 84 
720 8 
360 17 
720 17 
720 20 
720 20 
360 15 
360 19 
600 17 
600 21 
600 22 
18.4 Mound City, IL 110 600 12 
110 1,200 12 
42.1 Brookport, IL 110 600 12 
110 1,200 12 
35.3 Smithland, KY 110 1,200 22 
1,200 22 
135.0 Uniontown, KY 110 1,200 22 
600 22 
204.9 Newburgh, IN 110 1,200 16 
110 600 16 
260.3 Cannelton, IN 110 1,200 25 
110 600 25 
374.2 Louisville, KY 110 1,200 37 
110 600 37 
56 360 37 
449.5 Markland, IN 110 1,200 35 
110 600 35 
544.8 Chilo, OH 110 1,200 30 
110 600 30 
640.0 Greenup, KY 110 1,200 30 
110 600 30 
701.8 Hogsett, WV 110 600 23 
110 360 23 
743.5 Letart Falls, OH 110 1,200 22 
110 600 22 
777.1 Reedsville, OH 110 1,200 22 
110 600 22 
819.3 Waverly, WV 110 1,200 20 
110 600 20 
854.6 New Martins- 110 1,200 21 
ville, WV 
110 600 21 
896.7 Warwood, WV 110 1,200 21 
110 600 21 
926.6 Stratton, OH 110 1,200 21 
110 600 21 
949.3 Industry, PA 110 600 18 
56 360 18 
967.7 Glenwillard, PA 110 600 10 
56 360 10 
974.8 Emsworth, PA 110 600 18 
56 360 18 
15.1 Stuart, FL 50 
78.0 Moore Haven, FL 50 
93.6 LaBelle, FL 50 
121.4 Fort Myers, FL 56 
250 13 
250 2 
250 11 
400 3 
304.0 Simmesport, LA 75 1,200 35 
25.0 Jonesville, LA 
117.2 Columbia, LA 
84 
84 
600 30 18 
600 18 18 
12 
20 
20 
21 
21 
11 
15 
18 
14 
18 
15 
15 
15 
15 
34 
34 
34 
34 
32 
32 
38 
38 
49 
19 
19 
50 
50 
45 
45 
45 
45 
18 
18 
37 
37 
37 
37 
35 
35 
38 
38 
17 
17 
17 
17 
16 
16 
13 
13 
17 
16 
14 
10 
12 
13 
12 190721 
11 Movable 535 1932 
11 193221 
15 Movable 460 1964 
15 1964 
10 Fixed 610 192521 
10 Movable 560192521/22 
15 Movable 410 1950 
15 Movable 530 1959 
14 Movable366 1964 7.0 
10 Movable 3,978 1929 
10 Temporary Lock 1980 
11 Movable 3,073 1928 
11 Temporary Lock 1969 
12 Movable 3,560 1980 
12 
12 Movable 3,516 1975 
12 
16 Movable 2,272 1975 
16 
13 Movable 1,965 1972 
13 
12 Movable 8,627 1961 
11 1921 
11 1930 
15 Movable 1,395 1963 
15 1963 
15 Movable 1,756 1962 
15 1962 
15 Movable 1,287 1962 
15 
15 Movable 1,132 1937 
15 
15 Movable 1,202 1970 
15 
15 Movablel,206 1969 36.4 
15 
15 Movable 1,128 1973 
15 
17 Movable 1,098 1972 
17 
18 Movable 1,306 1965 
18 
15 Movable 1,315 1961 
15 
15 Movable 1,379 1936 
15 
18 Fixed 1,585 1929 
18 
13 Movable 1,717 1921 
13 
12 Movable 170 1941 
11 None 1953 
11 Movable 104 1937 
-- Movable 1,150 1965 
11 11 None 1963 
14 Movable 450 1972 
13 Fixed 400 1972 
19.7 9 300 
23.8 9 300 
5.8 9 300 
11.2 9 300 
6.0 9 300 
7.4 9 300 
9 300 
23.7 9 300 
35.8 9 300 
99.7 9 300 
69.9 9 300 
55.4 9 300 
116.3 9 400 
75.3 9 300 
95.3 9 300 
9 300 
95,2 9 300 
61.8 9 300 
41.7 9 300 
33.6 9 300 
9 300 
35.3 9 1,000 
36.0 9 300 
29.9 9 300 
22.7 9 300 
18.4 9 300 
7.1 9 300 
6.2 9 300 
15.1 8 80 
15.6 8 90 
15.6 8 90 
7.9 8 90 
12 125 
92.2 9 100 
106.2 9 100 
C-5

APPENDIX C (Continued) 
NAVIGATION LOCKS AND DAMS OPERABLE SEPTEMBER 20, 1987 
Locks Dams Authorized Channel 
Miles Width Available Lift at Depth on Sills 
Above Community of Length for Normal Length Year Length Depth Width 
Project Mouth in Vicinity Chamber Width Pool Level Upper Lower Typel (feet) Opened (miles) (feet) (feet) 
Calion Lock 
(Ouachita River) 
Felsenthal Lock 
(Ouachita River) 
Pearl River, MS and LA 
Lock 1 
Lock 2 
Lock 3 
Red River Waterway 
Lock 1 
Sacramento River, CA 
Barge Canal Lock 
Snake River, WA 
Ice Harbor Lock and Dam 
Lower Monumental Lock 
and Dam 
Little Goose Lock and Dam 
Lower Granite Lock 
and Dam 
St. Mary's River, MI 
South Canal: 
MacArthur Lock 
Poe Lock 
North Canal: 
Davis Lock 
Sabin Lock 
Savannah, GA 
New Savannah Bluff Lock 
and Dam 
Tennessee River, TN, AL, 
MS, and KY
1 8 
Kentucky Lock and Dam 
Pickwick Landing Lock 
and Dam 
Auxiliary Lock 
Main Lock 
Waterway Connecting 
Tombigbee and Tennessee 
Rivers, AL and MS 
Gainesville Lock and Dam 
Aliceville Lock and Dam 
Columbus Lock and Dam 
Aberdeen Lock and Dam 
Lock A and Spillway 
Lock B and Spillway 
Lock C and Spillway 
Lock D and Spillway 
Lock E and Spillway 
Bay Springs Lock and Dam 
Wilson Lock and Dam 
Main Lock 
Auxiliary Lock 
General Joe Wheeler Lock 
and Dam 
Main Lock 
Auxiliary Lock 
Guntersville Lock and Dam 
Main-Lock 
Auxiliary Lock 
Nicknjack Lock and Dam 
Chickamauga Lock and Dam 
Watts Bar Lock and Dam 
Fort London Lock and Dam 
Melton Hill Lock and Dam 
281.7 
226.8 
84 
84 
29.417 Pearl River, LA 65 
40.717 Bush, LA 65 
43.917 Sun, LA 65 
43.8 
42.8 West Sacramento, 
CA 
9.7 Pasco, WA 
41.6 Kahlotus, WA 
70.3 Starbuck, WA 
107.5 Pomeroy, WA 
47.0 Sault Ste. Marie, 
MI 
47.0 Sault Ste. Marie, 
MI 
47.0 Sault Ste. Marie, 
MI 
47.0 Sault Ste. Marie, 
MI 
187.2 Augusta, GA 
22.4 Gilbertsville, KY 
206.7 Hamburg, TN 
206.7 Hamburg, TN 
49.1 Gainesville, AL 
89.8 Aliceville, AL 
117.6 Columbus, MS 
140.4 Aberdeen, MS 
154.1 Amory, MS 
159.3 Smithville, AL 
174.0 Fulton, MS 
181.4 Fulton, MS 
189.7 Belmont, MS 
194.9 Tupelo, MS 
259.4 Florence, AL 
259.4 Florence, AL 
600 12 18 
600 13 18 
310 26.7 10 
310 15 10 
310 11 10 
84 685 38 22 
86 600 4 13 
86 675 100 15 
86 675 98 15 
86 675 98 15 
86 675 100 15 
80 800 22 31 
110 1,200 22 32 
80 1,350 22 24 
80 1,350 22 24 
56 360 15 14 
110 600 56 11 
110 600 55 10 
110 1,000 55 10 
110 600 36 15 
110 600 27 15 
110 600 27 15 
110 600 27 15 
110 600 30 15 
110 600 25 18 
110 600 25 18 
110 600 30 18 
110 600 30 18 
110 600 84 18 
110 600 94 13 
60 292 94 11 
274.9 Florence, AL 110 600 48 13 
274.9 Florence, AL 60 400 48 15 
349.0 Guntereville, AL 110 600 39 13 
349.0 Guntersville, AL 60 400 39 13 
424.7 Ghattanooga, TN 110 600 39 13 
471.0 Chattanooga, TN 60 360 49 10 
529.9 Breendenton, TN 60 360 58 12 
602.3 Lenoir City, TN 60 360 72 12 
13 Movable 350 1984 50.3 9 100 
13 Movable 350 1984 55.2 9 100 
10 None 
10 None 
10 None 
1951 11.1 7 80 
1951 3.2 7 80 
1951 13.2 7 80 
13 Fixed 550 1984 44.2 9 200 
13 None 1961 1.5 13 120 
15 Movable 2,790 1962 31.9 14 250 
15 Movable 3,800 1969 28.7 14 250 
15 Movable 2,670 1970 37.2 14 250 
15 Movable 3,200 1975 38.0 14 250 
31 None 
32 None 
23 None 
23 None 
1943 
1968 
1914 
1919 
27 
12 Movable 360 1936 16.2 9 90 
13 Tainter 7,976 1944 184.3 9 300 
13 Bulkhead 7,385 1937 52.7 9 300 
13 Bulkhead 7,385 1984 52.7 9 300 
15 Movable 15,460 1978 49.1 9 300 
15 Movable 14,790 1979 40.7 9 300 
15 Movable 10,040 1981 27.8 9 300 
15 Movable 10,640 1984 22.8 9 300 
15 Movable -- 1985 13.7 9 300 
18 Movable -- 1985 14.7 9 300 
18 Movable -- 1985 7.4 9 300 
18 Movable -- 1985 8.3 9 300 
18 Movable -- 1985 5.2 9 300 
18 None 10,640 1985 64.5 9 300 
13 Bulkhead 3,728 1959 15.5 9 300 
11 Bulkhead 3,728 1927 15.5 9 300 
13 Bulkhead 5,738 1963 74.1 9 300 
13 Bulkhead 5,738 1962 74.1 9 300 
13 Tainter 3,837 1965 75.7 9 300 
12 Tainter 3,837 1939 75.7 9 300 
11 Tainter 3,763 1967 46.3 9 300 
14 Tainter 5,654 1940 58.9 9 300 
12 Tainter 2,646 1942 72.4 9 300 
12 Tainter 3,687 1943 49.8 9 300 
C-6

APPENDIX C (Continued) 
NAVIGATION LOCKS AND DAMS OPERABLE SEPTEMBER 20, 1987 
Locks Dams Authorized Channel 
Miles Width Available Lift at Depth on Sills 
Above Community of Length for Normal Length Year Length Depth Width 
Project Mouth in Vicinity Chamber Width Pool Level Upper Lower Type
1 
(feet) Opened (miles) (feet) (feet) 
(Clinch River) 23.1 Kingston, TN 75 400 54 13 13 Tainter 1,072 1963 38.2 9 30019 
Willamette River at 
Willamette Falls, OR 
Lock No. 1 26.0 Oregon City, OR 40 210 20 6 8 None 1872 6 150 
Lock No. 2 26.0 Oregon City, OR 40 210 10 6 8 None 1872 
Lock No. 3 26.0 Oregon City, OR 40 210 10 6 8 None 1872 
Lock No. 4 26.0 Oregon City, OR 40 210 10 6 8 None 1872 .4 
Guard Lock 26.4 Oregon City, OR 40 210 10 6 8 None 1872 23.6 6 NS 
1 
Fixed; crest without gates or other facility to control streamflow. Movable; includes any type of crest gates, tainter gates, wickets, or others to control streamflow. 
2
Above mouth of Mobile River. 
3 
Includes length of earth dikes. 
4
From mouth of Apalachicola River. 
5
From mouth of Chattahoochee River. 
6
Above Norfolk, VA. 
7With reference to mean low water, or low mean Gulf as case may be. 
From Gulf Intracoastal Waterway. 
9
Average high and low water conditions, lift varying widely, depending on tides and river stages. 
1 0
Frmm foot of Government Street, Mobile, AL. 
1 1
Frm mouth of St. Johns River. 
1 2
Above Head of Passes. 
1 3
From New Orleans, LA. 
1 4 
Salt water barrier in down position. Will clear 15-foot vessels in normal position. 
1 5
Above the Ohio River. 
1 6
Channel completed to depth of 6.5 feet. 
1 7
From mouth of West Pearl River. 
1 8
Tennessee River locks operated by the Corps, dams operated by the Tennessee Valley Authority. 
1 9 
300-foot width from lock to mouth of Clinch River and 175-foot width upstream from lock to Clinton, TN. 
2 0
Dates shown represent replacement structures. 
2 1
Dates shown represent reconstruction for locks and dams Nos. 2-8 inclusive. 
2 2
Dam was rebuilt in 1959. 
2301d 11(0 X 358 lock replaced in 1957. 
2 4 
Inoperable, caretaker status September 7, 1982. 
2 5 
Inoperable, caretaker status October 1, 1981. 
C-7

APPENDIX D 
NAVIGATION PROJECTS UNDER CONSTRUCTION DURING FISCAL YEAR 1987 
Fiscal Year 
Fiscal Placed in Completed or 
Year Useful Scheduled for 
Project Started Operation Completion Nature of Project 
Agat Small Boat Harbor, Guam (Sec 107).............................. 
AIWW - Replacement of Federal Hwy Bridges in NC................ 
Baltimore Harbor (50 foot), MD & VA.......................................... 
Barnegat Inlet, NJ......................................................................... 
Bonneville Navigation Lock, OR & WA........................................ 
Brandon Road Lock and Dam, Illinois Waterway, IL................. 
Burns Waterway Small Boat Harbor, IN (Sec 107)..................... 
Calumet Harbor and River, IL and IN........................................... 
Calumet-Sag. Mod., Illinois Waterway, IL and IN, Part 1........... 
Cannelton Locks and Dam, Ohio River, IN and KY..................... 
Channel to Newport News, VA (1965 Mod.).................................. 
Channel to Newport News, VA (1986 Mod.).................................. 
Corpus Christi Ship Channel, TX............................................. 
Dashields L/D, Ohio River, PA............................... ................... 
Delaware River in the Vicinity Of Camden, NJ............................. 
Emsworth Locks and Dams, Ohio River, PA................................. 
Fisherman's Wharf Area, CA........................................................ 
Falls of the Ohio National Wildlife Conservation Area, 
IN and KY........................................................... ....................... 
Freeport Harbor, TX................................................. ................... 
Gallipolis Locks and Dam, Ohio River........................................... 
Geneva-on-the-Lake, OH.......................................... ................... 
Herring Creek, Tall Timbers, MD.............................................. 
Irondequoit Bay, NY................................................. .................... 
Jonesport Harbor, MER.............................................. ................... 
Kaskaskia River, IL................................................ .................... 
Kill Van Kull - Newark Bay, NJ and NY....................................... 
Krebs Lake, M S (Sec 107)............................................................. 
LaGrange Lock and Dam, Illinois Waterway, IL......................... 
Little Rock Slackwater Harbor, Little Rock, AR.......................... 
Lock and Dam 20, M O........................................... ...................... 
Lock and Dam 21, IL.................................................................... 
Lock and Dam 22, M O............................................ ...................... 
Lock and Dam 26 Replacement IL and MO.................................. 
Lockport Lock, Illinois Waterway, IL............................................ 
Locks and Dam 52, IL and KY............................................. 
Locks and Dam 53, IL and KY.................................................... 
Lorain Small Boat Harbor, OH (Sec 107)...................................... 
Lower Thorofare, Somerset County, MD.................................... 
Marseilles Dam, Illinois Waterway, IL......................................... 
McClellan-Kerr Arkansas River Navigation System, AR........... 
Mississippi River between Ohio and Missouri Rivers............... 
Mississippi River, Gulf Outlet, LA.... ....................... 
1987 
1982 
1987 
1985 
1985 
1983 
1984 
1964 
1955 
1962 
1967 
1987 
1972 
1986 
1987 
1980 
1984 
1984 
1987 
1985 
1986 
1986 
1984 
1987 
1966 
1986 
1983 
1986 
1987 
1986 
1987 
1987 
1974 
1983 
1979 
1979 
1986 
1986 
1985 
1963 
1910 
1958 
1983 
1987 
1966 
1968 
1966 
1968 
1986 
1987 
1986 
1974 
1983 
1987 
1988 
1984 
1990 
1991 
1992 
1988 
1987 
Indefinite 
Indefinite 
1982 
Indefinite 
1988 
1990 
1990 
1988 
1985 
1987 
In 
1987 
1987 
1968 
Dredging and breakwater 
Streambank Protection 
Deepdraft channel deepening 
Jetty realignment and dredging 
New larger lock 
Major rehabilitation of lock and dam 
Dredging and breakwater 
Dredging and channel, widening 
and deepening 
Channel improvements and 
relocation 
Replacement of existing locks and 
dams 43-45 inclusive 
Deep draft channel widening and 
deepening, deferred anchorage 
construction 
Dredge 50 ft. Channel 
Dredging 
Major rehabilitation of ocks and 
dams 
Dredging 
Major rehabilitation of lock and dam 
Breakwater 
idefmite Protection of a National Natural 
Landmark 
1992 Dredging, jetty construction, and 
recreation 
1995 Replacement of existing locks and 
major rehabilitation of the dam 
1988 Breakwaters, channel excavation, 
wetland mitigation 
1987 Beachfill, stone revetment 
1987 Dredging, breakwater, navigation 
channel, getties and recreation 
1989 Breakwater, dredging of new 
channel and anchorage 
1986 Lock, dam and channel 
1989 Deepdraft channel - widening and 
deepening 
1984 Dredging, navigation channel 
1990 Major Rehabilitation of Lock and 
Dam 
1988 Dredging, deepening, channel and 
turning basin 
1990 Major Rehabilitation of Lock and 
Dam 
1989 Major Rehabilitation of Lock and 
Dam 
1989 Major Rehabilitation of Lock and 
Dam 
1991 Lock and Dam 
1987 Major rehabilitation of lock 
1985 Major rehabilitation of locks and 
dam 
1987 Major rehabilitation of locks and 
dam 
1987 Breakwaters 
1987 Stone breakwater, jetty 
1988 Major rehabilitation of lock and dam 
1989 Locks and dams 
2000 Regulating works 
1984 Dredging and jetties 
D-1

APP NDIX D (Continued) 
FLOOD CONTROL PROJECTS UNDER CONSTRUCTION DURING FISCAL YEAR 
1986 
Fiscal Year 
Fiscal Placed in Completed or 
Year Useful Scheduled for 
Project Started Operation Completion Nature of Project 
Missouri River, Sioux City, IA to mouth....................................... 
Montgomery Locks & Dams, Ohio River, PA................................ 
Moriches Inlet, NY................................................ ................. 
Mouth of Colorado River, TX (Gulf Intracoastal 
W aterway).......................... ... ..................... 
Nawiliwili Harbor, Kauai, HI................................. ..................... 
New York Harbor, NY and NJ................................................... 
Newburgh Locks & Dam, Ohio River, IN and KY........................ 
Norfolk Harbor Channel, VA (1965 Mod.)..................................... 
1912 1980 Indefinite Navigation and bank stabilization 
complete. Wildlife mitigation 
awaiting authorization 
1983 1987 Major rehabilitation of locks & dams 
1987 1989 Dredging and jetty repair 
1984 
1985 
1976 Inc 
1965 
1966 
Ocean City Harbor and Inlet, MD .............................................. 1983 
Ouachita and Black River, AR and LA........................................ 1964 
Norfolk Harbor Channel, VA (1986 Mod)................................... 
Norfolk Harbor, Thimble Shoal Channel, VA............................... 
Peoria Lock and Dam, Illinois Waterway, IL................................ 
Port Everglades Harbor, FL...................................... .................. 
Port Hueneme, CA....................................................... ................ 
Port Ontario Harbor, NY................................................................. 
Red River WW, Mississippi River to Shreveport, LA................... 
Rockport Harbor, Rockport, MA (Sec 107)..................................... 
Sacramento River Deep Water Ship Channel, CA........................ 
San Diego River and Mission Bay, CA.......................................... 
San Francisco Bay to Stockton, VA (John F. Baldwin 
and Stockton Ship Channels)................................................. 
Santa Cruz Harbor, CA............................................. .................. 
Shallow Creek, MD (Sec 107).................................. .................... 
Siuslaw River and Bar, OR....................................... .................. 
Smith Island, M D (Sec 107)...................................... ................... 
Smithland Locks and Dam, IL, IN, and KY.................................. 
1987 
1987 
1986 
1979 
1970 
1987 
1974 
1986 
1986 
1948 
1971 
1985 
1987 
1983 
1982 
1971 
Tampa Harbor, FL (Main Channel).............................................. 1976 
Tombigbee River, Columbus Port, MS (Sec 107)......................... 1987 
Uniontown Locks and Dam, Ohio River, IN and KY................... 1965 
W allisville Lake, TX.................................................. ................... 1967 
Zippel Bay, Lake of the Woods County, MN................................. 
1991 Breakwaters, dredging, and 
recreation 
1987 1987 Breakwater repair 
remental Indefinite Collection and removal of drift 
1969 1974 Replacement of locks and dams 46 
and 47 
1967 Indefinite Deep draft channel, deepening and 
deferred anchorage const. 
1936 1985 Rehabilitation of south jetty 
1984 1994 Replacement of six locks and dams, 
channel deepening to 9 feet and 
realignment 
1988 Dredge 50 ft. channel 
1988 Dredge outbound element 
1990 Major Rehabilitation of lock and 
1972 
19842 
1987 
1987 
1987 
1988 
In 
In 
1986 
1987 
1982 
1980 
1987 
1970 
1986 
dam 
Dredging 
Dredging 
Breakwaters, channel excavation 
definite Lock and dam construction. 
Channel improvement and 
realignment 
1987 Channel improvement and 
deepening 
1994 Deep draft channel, widening and 
deepending 
definite Dredging and breakwater 
Indefinite Deep draft channel, widening, 
deepening and dredging 
1987 Sand bypass system 
1988 Dredging 
1987 Extending jetties 
1983 Channel cut with breakwater 
1987 Replacement of existing locks and 
dams 50 and 51 
1987 Dredging 
1987 Navigation channels & turning 
basin 
1985 Replacement of locks and dams 48 
and 49 
Indefinite Multipurpose lake (navigation, 
salinity control, water supply, 
fish & wildlife, & recreational) 
1988 Breakwaters and Jetties 
1Walter Jones and Joseph P. Knapp completed; Core Creek has been funded for iniation of design; the three remaining bridges have 
not been funded. 
2Lock and Dam No. 1 placed in useful operation in 1984. Construction is continuing on Lock and Dam Nos. 2 and 3, and has not ben 
initiated on Lock and Dam Nos. 4 and 5. 
*Funded by O&M Major Rehabilitation Program 
D-2

APPENDIX D (Contihued) 
FLOOD CONTROL PROJECTS UNDER CONSTRUCTION DURING FISCAL YEAR 
1986 
Fiscal Year 
Fiscal Placed in Completed or 
Year Useful Scheduled for 
Project Started Operation Completion Nature of Project 
D-3

APPENDIX E 
NAVIGATION LOCKS AND DAMS OPERABLE SEPTEMBER 20, 1987 
Flood Control 
and/or 
Total Nay. Feature 
Storage Placed Initial Existing Scheduled Ultimate 
Community Capability in useful Power Installation Installation Installation Project Height Height 
Project River in Vicinity (acre-feet)
1 
Operation CY In FY (KW) (KW) (KW) Functions Type
2 (feet) (feet) 
Albeni Falls, ID Pend Oreille Newport, WA 1,153,000 
Allatoona Lake, GA Etowah Cartersville, GA 670,000 
Barkeley Dam & Cumberland Frand Rivers, 2,082,000 
Lake Barkeley, KY KY 
& TN 
Beaver Lake, AR White Eureka Springs, 1,952,000 
AR 
Blakely Mountain Ouachita Mt. Pine, AR 2,768,000 
Dam-Lake 
Ouachita, AR 
Bonneville L&D Columbia Bonneville,OR 537,000 
Lake Bonneville, 
OR & WA 
Broken Bow Lake,, Mountain Fork Broken Bow, OK 1,368,230 
OK Buford Dam, Lanier, 
GA Chattahoochee Buford, GA 2,554,000 
Bull Shoals Lake White Mountain Home 5,408,000 
AR & MO AR 
Clarence Cannon Salt Perry, MO 1,428,000 
Dam 
Carters Dam, GA Coosawatte Carters, GA 472,756 
Center Hill Lake, Caney Fork Lancaster, TN 2,092,000 
TN 
Cleatham L&D, TN Cumberland Ashland City, TN 104,000 
Chief Joseph Dam Columbia Bridgeport, WA 593,000 
(Rufus Woods 
Lake),WA 
Clarks Hill Lake Savannah Augusta, GA 2,900,000 
GA & SC 
Cooper River, Santee St. Stephen, SC 2,560,000 
Charleston 
Harbor, SC 
CordnlelHl ull L&D, Cumberland Carthage, TN 310,900 
TN 
Cougar Lake, OR S. Fork McKenzie Blue River, OR 219,000 
Dale Hollow Lake, Obey Celina, TN 1,706,000 
TN & KY 
Dardanelle L&D, Arkansas Dardanelle, AR 486,200 
AR 
DeGray Lake, AR Caddo Arkadelphia, AR 831,900 
Denison Dam (Lake Red Denison, TX 5,312,300 
Texoma), TX & 
OK 
Detroit Lake, OR, North Santiam Mill City, OR 461,000 
including Big 
Cliff Lake, OR 
Dworshak Dam N. Fork, Orofino, ID 3,453,000 
& Reservoir, Clearwater 
ID 
Eufaula Lake, OK Canadian Eufaula, OK 3,825,400 
Fort Gibson Lake, Frand (Neosho) Ft. Gibson, OK 1,284,400 
Lake 
Green Peter Lake, Middle Santiam Sweet Home, OR 491,000 
OR, including 
Foster Lake, OR 
Greers Ferry Lake, Little Red Heber Spings 2,844,000 
AR 
Harry S. Truman Osage Warsaw, MO 5,202,000 
Dam & Res. 
Hartwell Lake, Savannah Hartwell, GA 2,842,700 
GA & SC 
Hills Creek Lake, Middle Fork Oakridge, OR 356,000 
OR Wilamette 
Ice Harbor L&D Snake Pasco, WA 417,000 
(Lake 
Sacajawea), WA 
Jim Woodruff Dam Appalachicola Chattahoochee, FL 367,300 
(Lake Seminole), 
FL, GA & AL 
John Day L&D Columbia Rufus, OR 2,500,000 
(Lake Umatilla), 
OR & WA 
John H. Kerr Roanoke Boydton, VA 2,750,300 
Dam & 
Reservoir, NC 
& VA 
Robert F. Henry Alabama Benton, AL 234,200 
L&D, AL 
J. Percy Priest Stones Nashville, TN 652,000 
Dam & 
Reservoir, TN 
1962 1955 42,600 
1950 1950 74,000 
1964 1966 130,000 
1963 1965 112,000 
1953 1956 75,000 
1938 1938 1,076,600 
1968 1970 
1956 1967 
1962 1953 
1983 1985 
1975 1975 
1948 1961 
1952 1958 
1955 1956 
100,000 
86,000 
340,000 
58,000 
500,000 
135,000 
36,000 
2,457,384 
1952 1953 280,000 
N/A 1985 84,000 
1973 1974 
1963 1964 
1943 1949 
1969 1965 
1969 1972 
1944 1945 
100,000 
25,000 
54,000 
124,000 
68,000 
70,000 
1953 1054 118,000 
1972 1973 400,000 
1964 1964 
1950 1963 
1967 1967 
1962 1964 
1982 1982(4) 
1961 1962 
1961 1982 
1982 1982 
90,000 
45,000 
100,000 
96,000 
160,000 
344,000 
30,000 
603,000 
1967 1967 30,000 
1968 1969 2,160,000 
1962 1953 204,000 
1972 1975 68,000 
1967 1970 28,000 
42,600 NFPR C 90 1,055 
74,000 FPRW C 190 1,250 
130,000 NPFR CE 157 9,969 
112,000 FPSR CE 228 2,575 
75,000 FPRW E 235 1,100 
1,076,600 NPR C 122 2,690 
100,000 FPWSR E 225 2,750 
86,000 NFPW E 192 5,400 
340,000 FPR C 258 2,256 
58,000 FNPRSW CE 138 1,700 
500,000 FPRW ER 450 1,950 
135,000 FPR CE 250 2,160 
36,000 NPR C 75 801 
2,457,384 PIR C 230 5,998 
280,000 NFPRSW CE 200 5,680 
84,000 PW CE 86 876 
100,000 NPR CE 94 1,306 
64,600 NFPRI ER 445 1,738 
54,000 FPR C 200 1,717 
124,000 NPR C 6B 2,683 
108,000FNPRS E 243 3,400 
175,000 FPRSN E 165 17,200 
118,000 NFPRI C 382 1,528 
1,060,000 PNFR C 717 3,300 
90,000 ENPS E 114 3,200 
67,500 FP CE 110 2,990 
100,000 PFNIR C 340 1,380 
96,000 FPRS C 243 1,704 
160,000 FPRW CE 96 5,000 
344,000 NFPRS CE 204 17,852 
30,000 NFPRI GE 304 2,150 
603,000 NPRI CE 130 2,790 
30,000 NPRW CE 67 5,150 
2,700,000 NPRFI CE 161 5,900 
204,000 FPRW CE 144 22,285 
68,000 NPRW CE 101 14,962 
28,000 FPRW CE 147 2,716 
E-1

APPENDIX E (Continued) 
NAVIGATION LOCKS AND DAMS OPERABLE SEPTEMBER 20, 1987 
Flood Control 
and/or 
Total Nay. Feature 
Storage Placed Initial Existing Scheduled Ultimate 
Community Capability in useful Power Installation Installation Installation Project Height Height 
Project River in Vicinity (acre-feet)1 Operation CY In FY (KW) (KW) (KW) Functions Type 
2 (feet) (feet) 
Keystone Lake, OK Arkansas 
Laurel River, KY Laurel 
Libby Dam, Lake Kootenai 
Koocanusa, MT 
Little Goose L&D Snake 
(Lake Bryan), WA 
Lookout Point Lake Middle Fork 
including Dexter Willamette 
Lake, OR 
Lost Creek Lake, Rogue 
OR 
Lower Granite Snake 
L&D, WA 
Lower Snake 
Monumental 
L&D, WA 
McNary L&D Columbia 
Lake Wallula, 
OR & WA 
Millers Ferry Alabama 
L&D, AL 
Lake Greeson, AR Little Missouri 
New Melons Stanislaus 
Lake, CA
6 
Norfork Lake, AR North Fork 
& MO 
Old Hickory L&D, Cumberland 
TN 
Ozark-Jeta Taylor Arkansas 
L&D, AR 
Philpott Lake, VA Roanoke 
Robert S. Kerr Arkansas 
L&D and 
Reservoir, OK 
Sam Rayburn Dam 
& Reservoir, TX Angelina 
St. Mary's River, Great Lakes 
MI 
Snettisham, AK
7 
Speel 
Stockton Lake, MO Sac 
Table Rock White 
Lake, AR & MO 
TenkillerLake, OK Illinois 
The Dalles L&D Columbia 
(Lake Celilo), 
WA & OR 
Walter F. George Chattahooche 
L&D, GA & FL 
Webbers Falls Arkansas 
L&D, OK 
West Point Chattahooche 
Lake, AL & GA 
Whitney Lake, TX Brazos 
Wolf Creek Dam Cumberland 
(Lake 
Cumberland), KY 
Tulsa, OK 
London, KY 
Libby, MT 
Starbuck, WA 
Lowell, OR 
Trail, OR 
Pomeroy, WA 
Kahlotus, WA 
1,737,600 
435,600 
5,809,000 
565,000 
483,000 
465,000 
484,000 
376,000 
Umatilla, OR 1,550,000 
Camden, AL 331,8090 
Murfreesboro, AR 407,900 
Oakdale, CA 2,400,000 
Norfolk, AR 
Hendersonville, 
TN 
Ozark, AR 
Bassett, VA 
Sallisaw, OK 
1964 
1973 
1972 
1970 
1954 
1977 
1975 
1969 
1968 
1978 
1975 
1970 
1955 
1977 
1975 
1969 
70,000 
61,000 
525,000 
810,000 
135,000 
49,000 
810,000 
810,000 
1953 1964 980,000 
1969 
1950 
1978 
1979 
1950 
1979 
75,000 
25,500 
300,000 
1,983,000 1943 1944 80,550 
545,000 
148,400 
318,500 
522,700 
Jasper, TX 3,997,600 
Sault Ste. Marie --- 
MI 
Juneau, AK 352,400 
Stockton, MO 1,674,000 
Branson, MO 3,462,000 
Gore, OK 1,230,800 
The Dalles, OR 53,000 
Fort Gaines, GA 934,000 
Wevbbers Falls, OK 170,100 
West Point, GA 604,500 
Whitney, TX 1,999,500 
Jamestown, KY 6,089,000 
1954 
1969 
1951 
1970 
1957 
1973 
1954 
1971 
1965 1966 
1855 1952 
1973 
1969 45,200 
1958 1959 
1952 1953 
1957 1957 
1963 
1970 
1975 
1953 
1950 
1963 
1973 
1975 
1954 
1952 
100,000 
100,000 
14,000 
110,000 
52,000 
18,400 
46,700 
200,000 
34,000 
1,806,800 
130,000 
60,000 
73,375 
30,000 
270,000 
70,000 FNPWS E 121 4,600 
61,000 FPRW R 282 1,420 
840,000 FPR C 420 3,055 
810,000 NPRI CE 160 2,670 
135,000 NFPRI CE 243 3,381 
49,000 DFPISWR CE 345 3,600 
810,000 NPRIF CE 146 3,200 
810,000 NPRI CE 135 3,800 
1,625,000 NPRI CE 183 7,300 
75,000 NPRW CE 90 11,380 
25,500 FPRW C 183.5 941 
300,000 FIPRW ER 625 1,560 
163,000 FPRS C 216 2,624 
100,000 NPR CE 98 3,605 
100,000 NPR C 58 2,480 
14,000 FPR C 220 892 
110,000 NPR E 75 7,230 
52,000 FPWR CE 120 19,430 
18,400 NP Control Gate 
27,0008 73,700 P C
9 
18 338 
45,200 FPRW CE 128 5,100 
200,000 FPR CE 252 6,423 
34,000 FP E 197 3,000 
1,806,800 NPR CR 300 8,875 
130,000 NPRW CE 114 13,585 
60,000 NP E 84 4,370 
108,375 FPRW CE 97 7,250 
30,000 FPR CE 159 17,695 
270,000 FPR CE 258 5,736 
1Total of all storage functions, including inactive and dead storage to normal full pool level 
2
G: gravel; R: rock; C: concrete; E: earth 
4 
All units are synchronized-to-line and two units have passed the pumpback test. 
However, due to damaging effects to fish, no further pumping will be done for their testing or operation until a solution to the problem is found. 
6
Being operated for the Department of Interior by the Bureau of Reclamation 
7 
Being operated by the Alaska Power Administartion 
8
Crater Lake Unit 
9
Weir for Long Lake 
Nomenclature for Project Functions 
D--Debris Control P--Power 
F--Flood Control R--Public Recreation Annual Attendance exceeding 5,000 
I--Irrigation S-Water Supply 
N--Navigation W--Fish and Wildlife (Federal or State) 
E-2

APPENDIX F 
MULTIPLE-PURPOSE PROJECTS 
INCLUDING POWER UNDER CONSTRUCTION SEPTEMBER 30,1987 
Nameplate Capacity 
Fiscal Scheduled Scheduled 
Year for for Scheduled Ultimate 
Project Started Operation Completion Functions Installation Installation 
Bonneville Second Powerhouse, OR and WA.............................. 1974 1881 1991 PR 558,200 558,200 
Clarence Cannon Dam, Salt River, MO........................................ 1966 1985 1987 FNPRSW 58,000 58,000 
Harry S. Truman Dam and Reservoir, 
Osage River, MO................................................ ..................... 1965 19821 19891 FRPW 160,000 160,000 
Nanpil River Hydropower, Pohnpei, TTPI2 .................. ......... . . .... 1985 1988 1988 P 2,000 2,000 
New Melones Lake, CA3 .............................. ........... ............ ... ........ 1966 1979 IND DFIPRW 300,000 300,000 
Richard B. Russell Dam and Lake, Savannah 
River, GA and SC............................................... .................... 1975 1985 1991 FRP 600,000 600,000 
Cooper River, Charleston Hbr, SC.............................................. 1977 1985 1986 NWD 84,000 84,000 
Snettisham, AK...................................................... ...................... 1967 1989 1989 P 73,700 27,000 
1All units are synchronized-to-line and two units have passed the pumpback test. However, due to damaging effects to fish, no further 
pumping will be done for either testing or operation until a solution to the problem is found. 
2 Single Purpose Power. Special Appropriation by Congress. 
3New Melones Lake was turned over to the Bureau of Reclamation for operation on november 20,1979. Corps retains responsibility ofr 
facilities along the lower Stanislaus River. Remaining construction consists of recreation facilities and minor feature closeouts. 
KEY 
DFI
NP
RS 
W 
Redevelopment 
Flood Control 
Irrigation 
Navigation 
Power 
Recreation 
Water Supply 
Fish and Wildlife 
F-1

M
O, 
NA 
Ji 
JL 
JL 
A
A 
MAJOR FLOOD AND DAMAGES SUFFERED DURING FISCAL YEAR 1987 
Damag 
Lives Suffere 
Conth Location Lost ($000) 
ct 86 Middle America 5 400,0 
ov 86 Washington 1 25,0 
pr 87 Northeast 14 210,0, 
in 87 Middle America 13 550,0 
ul 87 Ohio Valley 4 50,0 
ul 87 Texas 10 1,0 
ug 87 Gulf Coast 0 50,0 
ug 87 Illinois 4 100,0 
es 
d
00 
00 
00 
00 
00 
00 
00 
00 
Subtotal 
Estimated Total 
Major Floods Only 
All Floods in U.S. 
OTHER MAJOR WEATHER EVENTS AND DAMAGES 
Event 
Tropical Cyclones 
Tornadoes 
Tidal (SYZYGY) 
Drought 
Estimated Total (Exclusive of Floods) 
*Values from the National Weather Service 
51 
88 
Number 
5 
747
11 
754 
1,386,000 
$1,500,000 
Dmages 
Sustained 
($000) 
0* 
150,000 
50,000 
440,000 
$640,000* 
Lives 
Lost 
0* 
42
00 42 
G-1

DISTRIBUTION BY REGION 
FLOOD DAMAGES PREVENTED BY CORPS 
(IN THOUSANDS OF DOLLARS) 
FY 1987 10-Year Average (1978-1987) 
Region $000 $000 
New England 463,300 1,883,947 
Mid Atlantic 30,300 3,406,567 
Gulf & So. Atlantic 220,000 708,572 
Ohio 172,900 4,427,933 
Tennessee 4,400 5,045 
Great Lakes 51,200 223,957 
Upper Mississippi 430,600 1,164,539 
Souris-Red-Rainy 52,000 171,879 
Missouri 1,504,500 5,715,070 
Arkansas-Red-White 996,600 2,103,112 
Lower Mississippi 666,800 73,456,171 
Rio Grande 113,600 583,686 
Texas and Gulf 190,900 1,134,679 
Colorado 0 398,260 
Great Basin 0 60,315 
California 154,900 19,117,250 
Columbia-North Pacific 126,000 7,103,176 
Alaska 17,000 55,559 
Hawaii 200 7,529 
Total 5,195,200 121,727,246 
G-2

DISTRIBUTION BY DISTRICT 
FY 87 FLOOD DAMAGES PREVENTED BY CORPS OF ENGINEERS* 
(IN THOUSANDS OF DOLLARS) 
District $000 
Vicksburg 405,606 
Memphis 190,341 
New Orleans 1,040 
St. Louis 69,771 
Kansas City 1,111,711 
Omaha 392,827 
Baltimore 8,157 
New York 11,928 
Norfolk 6,964 
Philadelphia 3,291 
Buffalo 19,893 
Chicago 2,000 
Detroit 31,352 
Rock Island 428,568 
St. Paul 52,039 
New England 463,321 
Alaska 17,000 
Portland 73,932 
Seattle 52,002 
Walla Walla 61 
Huntington 124,477 
Louisville 26,655 
Nashville 4,376 
Pittsburgh 21,734 
Pacific Ocean 220 
Charleston 694 
Jacksonville 2,619 
Mobile 3,321 
Savannah 1,594 
Wilmington 211,710 
Sacramento 0 
Los Angeles 154,858 
San Francisco 0 
Albuquerque 115,063 
Fort Worth 154,912 
Galveston 36,002 
Little Rock 154,701 
Tulsa 840,472 
Total $5,195,212 
*Includes Corps-controlled projects and Corps-supported emergency operations. 
G-3

DISTRIBUTION BY STATE 
FY 87 FLOOD DAMAGES PREVENTED BY CORPS OF ENGINEERS* 
(IN THOUSANDS OF DOLLARS) 
State $000 
Alabama 0 
Alaska 17,000 
Arizona 0 
Arkansas 395,504 
California 154,858 
Colorado 642 
Connecticut 224,314 
Delaware 0 
Florida 2,619 
Georgia 4,220 
Hawaii 220 
Idaho 623 
Illinois 260,336 
Indiana 14,257 
Iowa 376,965 
Kansas 284,377 
Kentucky 20,768 
Louisiana 113,053 
Maine 7,605 
Maryland 7,000 
Massachusetts 203,457 
Michigan 2,828 
Minnesota 5,888 
Mississippi 226,975 
Missouri 1,006,876 
Montana 277 
Nebraska 172,657 
Nevada 0 
New Hampshire 14,397 
New Jersey 94 
New Mexico 97,900 
New York 4,739 
North Carolina 94,430 
North Dakota 53,497 
Ohio 80,044 
Oklahoma 718,329 
Oregon 38,568 
Pennsylvania 9,971 
Puerto Rico 0 
Rhode Island 9,975 
South Carolina 694 
South Dakota 536 
Tennessee 5,253 
Texas 192,464 
Utah 0 
Vermont 6,295 
Virginia 124,709 
Washington 86,774 
West Virginia 48,768 
Wisconsin 12 
Wyoming 91 
Total $5,120,860 
*Includes Corps-controlled projects and Corps-supported emergency operations. 
G-4

FY 87 FLOOD DAMAGES INCURRED 
Property Acres Inundated 
State ($000) (Thousands of Acres) Lives Lost 
Alabama 755 5 2 
Alaska 20,000 1 
Arizona 7 0 
Arkansas 15,045 63 3 
California 1,015 0 
Colorado * 0 
Connecticut 5,000 0 
Delaware * 0 
Florida 645 10 0 
Georgia 1,470 4 
Hawaii 2,050 2 
Idaho 17 0 
Illinois 150,000 30 4 
Indiana 1,906 20 1 
Iowa 16,755 137 0 
Kansas 152,000 415 1 
Kentucky 68 2 
Louisiana 1,175 1 
Maine 61,250 5 1 
Maryland 51 1 
Massachusetts 47,480 7 1 
Michigan 15 0 
Minnesota 27,800 3 2 
Mississippi 6,380 15 0 
Missouri 100,550 16 1 
Montana * 0 
Nebraska 25,890 139 0 
Nevada 13 0 
New Hampshire 19,100 4 0 
New Jersey 17,050 8 0 
New Mexico 10 0 
New York 75,275 15 12 
North Carolina 20,461 5 0 
North Dakota 4,943 30 0 
Ohio 20,518 1 0 
Oklahoma 22,250 6 4 
Oregon 900 1 
Pennsylvania 28 0 
Rhode Island 550 0 
South Carolina 31,771 4 0 
South Dakota 3 0 
Tennessee 95 4 
Texas 546,515 5 29 
Utah 250 0 
Vermont 10,500 1 
Virginia 1,510 6 
Washington 30,150 1 
West Virginia 125 0 
Wisconsin 2,992 0 
Wyoming 16 0 
Puer-to-Rico 1,850 3 
Total $1.5 billion 88 
*Property damage unavailable but flooding occurred 
G-5

REPORT OF THE SECRETARY OF THE ARMY 
ON CIVIL WORKS ACTIVITIES FOR FY 1987 
INDEX 
The following abbreviations are used in the index: 
LMK 
LMM 
LMN 
LMS 
MR+T 
MRK 
MRO 
NAB 
NAN 
NAO 
NAP 
NCB 
NCC 
NCD 
NCE 
NCR 
NCS 
NED 
NPA 
NPP 
VICKSBURG, MISS., DISTRICT 
MEMPHIS, TENN., DISTRICT 
NEW ORLEANS, LA., DISTRICT 
ST. LOUIS, MO., DISTRICT 
MISSISSIPPI, RIVER AND 
TRIBUTARIES PROJECT 
KANSAS CITY, MO., DISTRICT 
OMAHA, NEBR., DISTRICT 
BALTIMORE, MD., DISTRICT 
NEW YORK, N.Y., DISTRICT 
NORFOLK, VA., DISTRICT 
PHILADELPHIA, PA., DISTRICT 
BUFFALO, N.Y., DISTRICT 
CHICAGO, ILL., DISTRICT 
MISSISSIPPI RIVER BETWEEN MISSOURI 
RIVER AND MINNEAPOLIS, MINN. 
DETROIT, MICH., DISTRICT 
ROCK ISLAND, ILL., DISTRICT 
ST. PAUL, MINN., DISTRICT 
NEW ENGLAND DIVISION 
ALASKA DISTRICT 
PORTLAND, OREG., DISTRICT 
A 
Aberdeen, Ohio (ORH) 25-21 
Aberdeen Creek, Va. (NAO) 5-23 
Abilene, Kans. (MRK) 20-17, 20-19 
Abiquiu Dam, N. Mex. (SWA) 17-3, 17-10 
Absecon Creek, N.J. (NAP) 3-21 
Absecon Inlet, N.J. (NAP) 3-21 
Accotink Creek, Va. (NAB) 4-33 
Adams, Hossic River Basin, Mass. (NAN) 2-36 
Adams Creek, S.C. (SAN) 7-15 
Adams Levee, Ind. (ORL) 24-22, 24-26 
Addison, N.Y. (NAB) 4-13, 4-25 
Adena, Ohio (Short Creek) (ORP) 26-23 
Adldkin Branch, N.C. (SAW) 6-28 
Afono Area and Aoa Area, American Samoa (POD) 
36-10 
Agana Small Boat Harbor, Guam (POD) 36-8 
Agat Harbor, Territory of Guam (POD) 36-1, 36-6 
AIWW-Mooring Basins, N.C. (SAW) 6-28 
AIWW-Tidal Lock in Snows Cut, N.C. (SAW) 6-28 
Airport Road Bridge, Frankstown, Miss. (SAM) 
10-13, 10-28, 10-38 
Ala Wai Small Boat Harbor, Hawaii (POD) 36-8 
Alabama River at Montgomery, Ala. (SAM) 10-43 
NPS 
NPW 
ORD 
ORH 
ORL 
ORN 
ORP 
POD 
SAJ 
SAM 
SAN 
SAS 
SAW 
SPK 
SPL 
SPN 
SWA 
SWF 
SWG 
SWL 
SWT 
SEATTLE, WASH., DISTRICT 
WALLA WALLA, WASH., DISTRICT 
OHIO RIVER DIVISION 
HUNTINGTON, W. VA., DISTRICT 
LOUISVILLE, KY., DIVISION 
NASHVILLE, TENN., DISTRICT 
PITTSBURGH, PA., DISTRICT 
PACIFIC OCEAN DIVISION 
JACKSONVILLE, FLA., DISTRICT 
MOBILE, ALA., DISTRICT 
CHARLESTON, S.C., DITRICT 
SAVANNAH, GA., DISTRICT 
WILMINGTON, N.C., DISTRICT 
SACRAMENTO, CALIF., DISTRICT 
LOS ANGELES, CALIF., DISTRICT 
SAN FRANCISCO, CALIF., DISTRICT 
ALBUQUERQUE, N. MEX., DISTRICT 
FORT WORTH, TEX., DISTRICT 
GALVESTON, TEX., DIVISION 
LITTLE ROCK, ARK., DISTRICT 
TULSA, OKLA., DISTRICT 
Alabama-Coosa Rivers, Ala. and Ga. (SAM) 10-18, 
10-29, 10-40, 10-45 
Alameda Creek, Calif. (SPK) 35-31 
Alamo Lake, Ariz. (SPL) 33-3, 33-10, 33-15 
Alamogordo Diversion Channel, Tularosa (Closed) 
Basin, N. Mex. (SWA) 17-7, 17-10 
Albemarle and Chesapeake Canal (Great Bridge, 
Va.) (NAO) 5-22 
Albeni Falls Dam, Idaho (NAS) 38-10, 38-17, 
38-23 
Albuquerque Diversion Channels, N. Mex. (SWA) 
17-1, 17-8, 17-10 
Alford, Green River, Mass. (NED) 1-22, 1-43, 
1-50 
Algoma Harbor, Wis. (NCE) 31-61, 31-62 
Alhambra Creek, Calif. (SPK) 35- 31 
Aliso Creek Dam, Calif. (SPL) 33-24 
Allatoona Lake, Ga. (SAM) 10-21, 10-30, 10-40 
Allegany, N.Y. Unit I (Allegheny River) (ORP) 
26-22, 26-26 
Allegany, N.Y. Unit II (Five Mile Creek Area) (ORP) 
26-22, 26-26 
Allegheny River, Pa. (ORP) 26-2, 26-13, 26-17, 
26-21, 26-26 
Allegheny River, Pa., Locks and Dams (ORP) 26-24 
Allegheny River, Oil City, Pa. (ORP) 26-3, 26-13 
Allentown, Pa. (NAP) 3-23 
I-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Allenville, Ariz. (SPL) 33-19 
Alley Bay, Beals, Maine (NED) 1-43 
Alloway Creek, N.J. (NAP) 3-14, 3-21 
Alluvial Valley Mapping (MR + T) 42- 3 
Alma Harbor, Wis. (NCD) 29-7 
Almond Lake, N.Y. (NAB) 4-13, 4-25 
Almond Village, N.Y. (NAB) 4-37 
Aloha-Rigolette Area, Grant and Rapides Parishes, 
La. (LMN) (LMK) 11-16, 11-18, 12-18, 12-19 
Alpena Harbor, Mich. (NCE) 31-61, 31-62 
Alpine Dam, Rockford, Ill. (NCR) 28-16 
Alpine, Tex. (SWA) 17-7, 17-10 
Alsea River, Oreg. (NPP) 37-39 
Altamaha, Oconee, and Ocmulgee Rivers, Ga. (SAS) 
8-1, 8-11, 8-12 
Alteration of Berwick Bay Bridge (LMN) 11-14 
Alteration to Rosiclare, Ill. (ORD) 22-3 
Alternative for Sugar Hill Reservoir (NED) 1-45 
Alton, Ind. (ORL) 24-22, 24-25 
Altus Reservoir, Okla. (SWT) 19-18 
Alum Creek Lake, Ohio (ORH) 25-2, 25-12, 25-16 
Alvin R. Bush Dam, Pa. (NAB) 4-18, 4-26 
Amazon Creek, Oreg. (NPP) 37-42 
American Lake, Vicinity of Fort Lewis, Wash. (NPS) 
38-26 
American River, Calif. (SPK) 35-31 
Atchison,.Kans. (MRK) 20-17 
Athalia, Ohio (ORH) 25-21 
Athens, Ohio (ORH) 25-20, 25-22 
Atlantic Beach Channels, N.C. (SAW) 6-25 
Atlantic City, N.J. (NAP) 3-23 
Atlantic Coast of Maryland and Assateague Island, 
Va. (NAB) 4-20 
Atlantic Coast of N.J. Sandy Hook to Barnegat Inlets 
(NAN) 2-36 
Atlantic Gulf Ship Canal, Fla. (SAJ) 9-46 
Atlantic Intracoastal Waterway between Norfolk, Va. 
and St. Johns River, Fla. (NAO) (SAW) (SAN) 
(SAS) (SAJ) 5-2, 5-14, 5-18, 5-22, 6-2, 6-18, 
6-22, 
7-2, 7-9, 7-11, 8-2, 8-11, 8-13, 9-2, 9-25, 
9-32 
Au Sable Harbor, Mich. (NCE) 31-61, 31-62 
Auasi Harbor, American Samoa (POD) 36-8 
Auburn, N.Y., Owasco Outlet (NCB) 32-37 
Augusta, Ga. (SAS) 8-7, 8-16 
Augusta, Ky. (ORH) 25-20 
Augusta Levee, Ga. (SAS) 8-7 
Augusta Levee, Kans. (SWT) 19-15 
Aunuu Harbor, American Samoa (POD) 36-8 
Aurora, Ind. (ORL) 24-22, 24-26 
Aurora, Westerly Creek-Kelley Road Dam, Colo. 
(MRO) 21-20 
Avoca, N.Y. (NAB) 4-13, 4-25 
Avon Harbor, N.C. (SAW) 6-4, 6-18 
Aylesworth Creek Lake, Pa. (NAB) 4-12, 4-24 
B 
B. Everett Jordan Dam and Lake, N.C. (Formerly 
New Hope Lake, N.C.) (SAW) 6-10, 6-15, 6-20 
Bachelor Island, Wash. (NPP) 37-44, 37-48 
Back Creek, Md. (NAB) 4-33 
Bad River, Bank Protection, Fort Pierre, S. Dak. 
(MRO) 21-20 
Bagaduce River, Maine (NED) 1-38, 1-43, 1-45 
Bailey, R.D., Lake, W. Va. (ORH) 25-9, 25-14, 
25-18 
Bainbridge, N.Y. (NAB) 4-35, 4-39 
Baker Brook, Mass. (NED) 1-45 
Baker River, Warren, N.H. (NED) 1-23 
Bakers Haulover Inlet, Fla. (SAJ) 9-3, 9-25, 9-32 
Ball Mountain Lake, Vt. (NED) 1-12, 1-27, 1-48 
Baltimore Harbor, Md. Collection and Removal of 
Drift (NAB) 4-4, 4-22, 4-28 
Baltimore Harbor, Md. Prevention of Obstruction 
and Injurious Deposits (NAB) 4-8, 4-23, 4-30 
Baltimore Harbor and Channels, Md. and Va. (NAB) 
4-3, 4-22, 4-27 
Baltimore Harbor and Channels (Norfolk District) 
(NAO) 5-2, 5-14, 5-18, 5-25 
Bandon Small Boat Basin, Oreg. (NPP) 37-39 
Bank Revetments and Dikes: Memphis District 
(MR+T) 42-39, 42-42 
Bank Revetments and Dikes: New Orleans District 
(MR+T) 42-30, 42-32 
Bank Revetments and Dikes: Vicksburg District 
(MR+T) 42-34, 42-36 
Bank Stabilization and Channel Rectification, Ark. 
(SWL) 18-2, 18-11, 18-21 
Bank Stabilization and Channel Rectification, 
Arkansas River, Ark. and Okla. (SWT) 19-16 
Bank Stabilization and Channel Rectification, Short 
Mountain to Fort Smith (SWL) 18- 21 
Banner Special Drainage and Levee Districts (NCR) 
28-14, 28-16 
Banning Levee-San Gorgonio River, Calif. (SPL) 
33-24 
Bar Harbor, Maine (NED) 1-38 
Bar Point Harbor, Alaska (NPA) 40-13 
Barataria Bay Waterway, La. (LMN) 11-14 
Barbers Point Harbor, Hawaii (POD) 36-2, 36-6, 
36-7 
Barbourville, Ky. (ORN) 23-13, 23-19 
Barcelona Harbor, N.Y. (NCB) 32-11, 32-35 
Bardwell Lake, Tex. (SWF) 16-3, 16-15, 16-19 
Barkley Dam and Lake Barkley, Ky. and Tenn. 
(ORN) 23-14 
Barnard, Kans. (MRK) 20-17 
Barnegat Inlet, N.J (NAP) 3-2, 3-15, 3-18 
Barnegat Light, N.J. (NAP) 3-23 
I-2

INDEX 
Barnett Creek, Ky. (ORL) 24-24 
Barre Falls Dam, Mass. (NED) 1-12, 1-27, 1-48 
Barren River Lake, Ky. (ORL) 24-5, 24-14, 24-27 
Bartley, Nebr. (MRK) 20-17, 20-19 
Bashbish Brook, Copake, N.Y. (NAN) 2-39 
Bass Harbor, Maine (NED) 1-38, 1-46 
Bass Harbor Bar, Maine (NED) 1-38 
Bassett Creek, Minn. (NCS) 27-4, 27-19 
Bastrop Bayou, Tex. (SWG) 15-27 
Batavia and Vicinity, N.Y. (NCB) 32-37 
Bath, N.Y. (NAB) 4-36, 4-39 
Baton Rouge Harbor, La. (LMN) 11-14 
Baton Rouge Harbor (Devil's Swamp), La. (MR+T) 
42-5, 42-29, 42-50 
Battle Creek, Bank Protection, Battle Creek, Nebr. 
(MRO) 21-20 
Baudette Harbor, Minn. (NCS) 27-23 
Bay City Harbor, Wis. (NCD) 29-7 
Bay Ridge and Red Hook Channels, N.Y. (NAN) 
2-2, 2-22, 2-27, 2-33 
Bay River, N.C. (SAW) 6-25 
Bayard, W. Va. (NAB) 4-36, 4-39 
Bayfield Harbor, Wis. (NCE) 31-61, 31-62 
Bayou Bartholomew and Tributaries, Ark. and La. 
(LMK) 12-4, 12-9, 12-11, 12-14, 12-16 
Bayou Bodcau and Tributaries, Ark. and La. (LMK) 
12-4, 12-9, 12-11, 12-17 
Bayou Bodcau, Red Chute, and Loggy Bayou, La. 
(LMN) (LMK) 11-16, 12-18, 12-19 
Bayou Bodcau Reservoir, La. (LMK) 12-16, 12-18, 
12-19 
Bayou Bonfouca, La. (LMN) 11-14 
Bayou Choupique, La. (LMN) 11-16 
Bayou Cocodrie and Tributaries, La. (MR+T) 42-6, 
42-14, 42-28, 42-54, 42-58 
Bayou Coden, Ala. (SAM) 10-3, 10-26, 10-32 
Big Sandy Lake, Tex. (SWF) 16-3, 16-15, 16-19 
Big Sandy River, W. Va. and Ky., including Levisa 
and Tug Forks (ORH) 25-19 
Big Sioux River at Sioux City, Iowa and S. Dak. 
(MRO) 21-16 
Big Sioux River, Fink Bridge, near Flandreau, S. 
Dak. (MRO) 21-20 
Big Sioux River, Schofield Bridge, near Flandreau, 
S. Dak. (MRO) 21-20 
Big Slough - Mayo Ditch, Ark. (MR+T) 42-57 
Big South Fork National River and Recreation Area, 
Ky. and Tenn. (ORN) 23-4, 23-9 
Big Spring, Tex. (SWF) 16-22 
Big Stone Lake and Whetstone River, Minn. and S. 
Dak. (NCS) 27-4, 27-19 
Big Stranger Creek, Kans. (MRK) 20-17 
Big Suamico River, Wis. (NCE) 31-2, 31-33, 
31-46 
Big Sunflower River, Miss. (LMK) (MR-T) 12-14, 
42-51 
Big Swan Drainage and Levee District, Ill. (LMS) 
14-14 
Big Thompson River, Johnstown (MRO) 21-20 
Big Timber Creek, N.J. (NAP) 3-21 
Big Walnut Lake, Ind. (ORL) 24-21, 24-28 
Big Wash, Milford, Utah (SPK) 35-31 
Big Wood River, Idaho (NPW) 39-14, 39-17 
Billings, Montana (MRO) 21-18 
Biloxi Harbor, Miss. (SAM) 10-4, 10-26, 10-33, 
10-45 
Biloxi Harbor, East Harrison County Canal, Miss. 
(SAM) 10-5, 10-26, 10-33 
Biloxi River at Lorraine Road, Harrison County, 
Miss. (SAM) 10-43 
Binghamton, N.Y. (NAB) 4-14, 4-25 
Birch, W. Va. (ORH) 25-20 
Birch Hill Dam, Mass. (NED) 1-13, 1-28, 1-48 
Birch Lake, Okla. (SWT) 19-3, 19-9, 19-13, 19-17 
Bird Rock Area, La Jolla, Calif. (SPL) 33-18 
Birds Point-New Madrid Floodway, Mo. (MR+T) 
42-53 
Biscayne Bay, Fla., Hurricane Protection (SAJ) 9-53 
Black Bayou-Pine Island Area, La. (LMN) 11-16 
Black Bayou Reservoir, La. (LMN) (LMK) 11-16, 
12-18, 12-19 
Black Bear and Miller Lakes, Minn. (NCS) 27-5, 
27-19 
Black Creek, Gadsden, Ala. (SAM) 10-43 
Black Fork at Hendricks, W. Va. (ORP) 26-22 
Black River, Ark. - Mo. (SWL) 18-16, 18-17 
Black River, Mich. (NCE) 31-61, 31-62 
Black River, N.C. (SAW) 6-25, 6-27 
Black River, Wis. (NCS) 27-23, 27-25 
Black River, Butler County Road 607, Mo. (SWL) 
18-4, 18-11 
Black River Harbor, Mich. (NCE) 31-3, 31-33, 
31-46, 31-63 
Black River Harbor, N.Y. (NCB) 32-35 
Black River Lake, Wis. (NCS) 27-25 
Black River (North Bend), Wis. (NCS) 27-27 
Black River, Poplar Bluff, Mo., to Knobel, Ark. 
(SWL) 18-17 
Black River (Port Huron), Mich. (NCE) 31-61, 
31-62 
Black Rock Channel and Tonawanda Harbor, N.Y. 
(NCB) 32-2, 32-18, 32-24, 32-39 
Black Rock Harbor, Conn. (NED) 1-3, 1-25, 1-33 
Black Rock Lake, Conn. (NED) 1-16, 1-29, 1-49 
Black Walnut Harbor, Md. (NAB) 4-33 
Black Walnut Point, Md. (NAB) 4-36 
Black Warrior and Tombigbee Rivers, Ala. (SAM) 
10-5, 10-26, 10-33, 10-47 
Blackberry Creek, Henry County, Va. (SAW) 6-31 
Blackbird Creek near Macy, Nebr. (MRO) 21-16 
Blackfoot Area, Snake River, Idaho (NPW) 39-14, 
39-16 
I-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Blackfoot Reservoir, Idaho (NPW) 39-14 
Blackfoot River, Idaho (NPW) 39-14, 39-16 
Blackfoot River, Mont. (NPS) 38-26 
Blackstone, Mass. (NED) 1-22 
Blackstone River Basin, Mass. and R.I. (NED) 1-10, 
1-23, 1-47 
Blackstone River, Millbury, Mass. (NED) 1-10, 
1-23, 1-27, 1-35, 1-48 
Blackwater Dam, N.H. (NED) 1-18, 1-30, 1-51 
Blackwater River, Fla. (SAM) 10-42, 10-45 
Blackwater River, Va. (NAO) 5-23 
Blaine, Maine (NED) 1-22 
Blaine Harbor, Wash. (NPS) 38-25, 38-31 
Blair and Sitcum Waterways, Tacoma Harbor, Wash. 
(NPS) 38-12 
Blakely Mountain Dam-Lake Ouachita, Ark. (LMK) 
12-16, 12-19 
Blind Slough Diking District, Oreg. (NPP) 37-40 
Block Island, Harbor of Refuge, RI (NED) 1-53 
Bloomington Lake, Md. and W. Va. (NAB) 4-11, 
4-24, 4-32 
Blue Marsh Lake, Pa. (NAP) 3-11, 3-17 
Blue Mountain Lake, Ark. (SWL) 18-4, 18-11, 
18-22 
Blue River Basin (Kansas City District) (MRK) 
20-17 
Blue River Channel, Kansas City, Mo. (MRK) 20-2, 
20-10, 20-13 
Blue River Lake, Oreg. (NPP) 37-11, 37-27, 
37-36, 37-47, 37-49 
Bluestone Lake, W. Va. (ORH) 25-3, 25-12, 25-16 
Bluff Creek, Miss. (SAM) 10-42 
Board of Engineers for Rivers and Harbors (BERH) 
41-1 
Bodega Bay, Calif. (SPN) 34-5 
Bodie Island, N.C. (SAW) 6-28 
Boeuf and Tensas Rivers and Bayou Macon, Ark. 
and La. (MR+T) 42-51 
Boeuf River, La. (LMN) 12-14 
Bogachiel River, Wash. (NPS) 38-26 
Boggy Creek, Tex. (SWF) 16-4, 16-15, 16-19 
Boise River, Idaho (NPW) 39-17 
Boise Valley, Idaho (NPW) 39-14, 39-16 
Boligee Canal, Boligee, Ala. (SAM) 10-13, 10-28, 
10-38 
Bolivar, N.Y. (ORP) 26-28 
Bolles Harbor, Mich. (NCE) 31-3, 31-33, 31-46 
Bon Secour River, Ala. (SAM) 10-6, 10-26, 10-34, 
10-42, 10-45 
Bonnes Coulee, Velva, N.D. (NCS) 27-24 
Bonnet Carre Spillway, La. (MR+T) 42-6, 42-56 
Bonneville Lock and Dam-Lake Bonneville, Oreg. 
and Wash. (NPP) 37-2, 37-17, 37-24, 37-28, 
37-31, 37-37, 37-51 
Bonpas Creek, Ill. (ORL) 24-22, 24-26 
Bonum Creek, Va. (NAB) 4-33 
Boone County, Ky. (ORL) 24-20 
Booneville Lake, Ky. (ORL) 24-21, 24-27 
Boothbay Harbor, Maine (NED) 1-38 
Boston Harbor, Mass. (NED) 1-38, 1-52, 1-53 
Boswell Lake, Okla. (SWT) 19-15 
Boulder Creek, Boulder, Colo. (MRO) 21-16 
Bound Brook, Scituate, Mass. (NED) 1-43 
Bowman, Leland, Lock, La. (formerly Vermilion 
Lock) (LMN) 11-2, 11-10, 11-12 
Bowman-Haley Lake, N. Dak. (MRO) 21-2, 21-10, 
21-13 
Brackenridge, Tarentum and Natrona, Pa. (ORP) 
26-22, 26-26 
Bradford, Pa. (ORP) 26-22, 26-28 
Bradford, Tenn. (LMM) 13-6 
Bradley Lake, Alaska (NPA) 40-14 
Bramwell, W. Va. (ORH) 25-22 
Brandon Road Lock and Dam, Ill. (NCC) 28-20, 
28-21 
Branford Harbor, Conn. (NED) 1-38 
Branson Cove, Va. (NAB) 4-33 
Brant Rock Beach, Marshfield, Mass. (NED) 1-45 
Braymer Lake, Mo. (MRK) 20-17 
Brazos Island Harbor, Tex. (SWG) 15-2, 15-13, 
15-16, 15-28, 15-29, 15-34 
Brazos River, Tex., Velasco to Old Washington 
(SWG) 15-27 
Brea Dam, Calif. (SPL) 33-24 
Breckenridge, Minn. (NCS) 27-27 
Breton Bay, Md. (NAB) 4-33 
Brevard County, Fla. (SAJ) 9-17, 9-29, 9-40 
Brevoort Levee, Ill. (ORL) 24-20, 24-29 
Bridge Alterations Authorized 
Chicago, Ill., District (NCC) 30-15 
Nashville, Tenn., District (ORN) 23-4 
New England Division (NED) 1-9 
Bridgeport Harbor, Conn. (NED) 1-22, 1-38, 
1-45, 1-53 
Bridges, Columbia River, Oreg. (NPP) 37-39 
Bridgewater, Va. (NAB) 4-36, 4-39 
Brilliant, Ohio (ORP) 26-23 
Bristol Harbor, R.I. (NED) 1-3, 1-25, 1-33, 1-38 
Broad Creek, Md. (NAB) 4-33 
Broad Creek, N.C. (SAW) 6-27 
Broad Creek, Va. (NAO) 5-3, 5-14, 5-18 
Broad Creek River, Del. (NAB) 4-33 
Broadkill River, Del. (NAP) 3-21 
Broadwater Creek, Md. (NAB) 4-37 
Broadway Lake, S.C. (SAS) 8-7, 8-11, 8-15 
Brockway, Pa. (ORP) 26-23 
Brockway Lake, Vt. (NED) 1-45 
Broken Bow, Nebr. (MRO) 21-20 
Broken Bow Lake, Okla. (SWT) 19-7, 19-12, 
19-14, 19-17 
Bromley, Ky. (ORL) 24-22, 24-25 
Bronx River, N.Y. (NAN) 2-2, 2-22, 2-27, 2-37 
I-4

INDEX 
Brookfield Lake, Mo. (MRK) 20-17 
Brooklyn, W. Va. (ORH) 25-21 
Brookport, Ill. (ORL) 24-20, 24-24, 24-29 
Brookville, Pa. (ORP) 26-22, 26-28 
Brookville Lake, Ind. (ORL) 24-5, 24-14, 24-27 
Broward County, Fla., Beach Erosion Control and 
Hillsboro Inlet, Fla., Navigation Project (SAJ) 
9-18, 9-29, 9-40 
Brown, Clarence J., Dam and Reservoir, Ohio (ORL) 
24-8, 24-15 
Browns Creek, N.Y. (NAN) 2-3, 2-22, 2-27, 2-33, 
2-37 
Brownwood Channel Improvement, Tex. (SWF) 
16-22 
Brunswick County Beaches, N.C. (Cape Fear to 
North Carolina-South Carolina 
State Line) (SAW) 6-27 
Brunswick Harbor, Ga. (SAS) 8-3, 8-6, 8-11, 
8-13 
Brush Creek, Kansas City, MO. (MRK) 20-9 
Buchanan Dam-H. V. Eastman Lake, Calif. (SPK) 
35-4, 35-23 
Buck Creek, N.C. and S.C. (SAN) 7-8, 7-16 
Buckhannon, W. Va. (ORP) 26-22, 26-28 
Buckhannon River, W. Va. (ORP) 26-21 
Buckhorn Lake, Ky. (ORL) 24-6,. 24-14, 24-27 
Bucks Harbor, Machiasport, Maine (NED) 1-38 
Bucksport Harbor, Maine (NED) 1-38 
Buena Vista, Ohio (ORH) 25-21 
Buena Vista, Va. (NAO) 5-24 
Buffalo, Wyo. (MRO) 21-16 
Buffalo Bayou and Tributaries, Tex. (SWG) 15-9, 
15-14, 15-25 
Buffalo Creek, Lee County, N.C. (SAW) 6-31 
Buffalo Creek, Meadow Grove, Nebr. (MRO) 21-16 
Buffalo Creek, Scranton, N. Dak. (MRO) 21-16 
Buffalo Fork, Ferry Location, Wyo. (NPW) 39-17 
Buffalo Harbor, N.Y. (NCB) 32-3, 32-18, 32-25 
Buffalo River, Miss. (LMK) 12-19 
Buffumville Lake, Mass. (NED) 1-21, 1-31, 1-52 
Buford Dam, Ga. (SAM) 10-22 
Bull Run, Pa. (NAB) 4-36 
Bull Shoals Lake, Ark. (SWL) 18-8, 18-13, 18-24 
Bullocks Point Cove, R.I. (NED) 1-38 
Bunker Harbor, Maine (NED) 1-38 
Burbank-Eastern System, Calif. (SPL) 33-22 
Burbank-Western System (Lower) Calif. (SPL) 
33-22 
Burbank-Western System (Upper) Calif. (SPL) 
33-22 
Burch Creek, Weber County, Utah (SPK) 35-31 
Burgettstown, Pa. (ORP) 26-22 
Burgettstown-Slovan, Pa. (ORP) 26-28 
Burial Hill Beach, Westport, Conn. (NED) 1-42 
Burketts Creek, Amory, Miss. (SAM) 10-43 
Burlington, Iowa (NCR) 28-16 
Burlington, Ohio (ORH) 25-20 
Burlington Dam, N. Dak. (NCS) 27-24 
Burlington Harbor, Vt. (NAN) 2-34 
Burns Small Boat Harbor, Ind. (NCC) 30-15 
Burns Waterway Harbor, Ind. (NCD) 30-2, 30-6, 
30-9, 30-11, 30-14, 30-15 
Burnsville Lake, W. Va. (ORH) 25-3, 25-12, 25-16 
Bush, Alvin R., Dam, Pa. (NAB) 4-18, 4-26 
Butler, Pa. (ORP) 26-22, 26-28 
Buttermilk Bay Channel, Mass. (NED) 1-38 
Buttermilk Channel, N.Y. (NAN) 2-3, 2-22, 2-27, 
2-33 
Byram River at Pemberwick, Conn. (NAN) 2-36 
C 
Cache Basin, Ark. (MR+T) 42-10, 42-18, 42-28, 
42-53 
Cache Creek Basin, Calif. (SPK) 35-21 
Cache La Poudre River, Ft. Collins, Colo. (MRO) 
21-20 
Cache La Poudre River, Windsor, Colo. (MRO) 
21-20 
Cache River Diversion, Ill. (LMS) 14-14 
Cache River Levee, Ill. (ORL) 24-29 
Caddo Lake, La. (LMK) 12-5, 12-9, 12-11, 12-17 
Cadet Bayou, Miss. (SAM) 10-42, 10-45 
Cadle Creek, Md. (NAB) 4-37 
Caesar Creek Lake, Ohio (ORL) 24-6, 24-15, 
24-27 
Cagles Mill Lake, Ind. (ORL) 24-6, 24-15, 24-27 
Cahaba River, Ala. (SAM) 10-42 
Cairo, W. Va. (ORH) 25-22 
Calabash Creek, N.C. (SAN) 7-15 
Calapooya River, Oreg. (NPP) 37-44 
Calaveras River and Little John Creek and 
Tributaries, including New Hogan Lake and 
Farmington Dam, Calif. (SPK) 35-5, 35-23 
Calcasieu River and Pass, La. (LMN) 11-14 
Calcasieu River at Coon Island, La. (LMN) 11-14 
Calcasieu River at Devil's Elbow, La. (LMN) 11-14 
Calcasieu River Salt Water Barrier, La. (LMN) 
11-14 
Caledonia, N.Y. (NCB) 32-37 
Calf Pasture Beach Park, Conn. (NED) 1-42 
California (Cincinnati) Ohio (ORL) 24-22, 24-26 
California Debris Commission (CDC) 44-1 
Calion, Ark. (LMK) 12-13, 12-16 
Calloway Branch, Hurst, Tex. (SWF) 16-22 
Calumet Harbor and River, Ill. and Indiana (NCC) 
30-2, 30-9, 30-11, 30-14, 30-15 
Calumet River Bridges, Ill. (NCC) 30-15 
Camas Creek, Idaho (NPW) 39-16 
Cambridge Harbor, Md. (NAB) 4-33 
Cambridgeport Lake, Vt. (NED) 1-45 
I-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Camden Harbor, Maine (NED) 1-38 
Camelsback Dam, Ariz. (SPL) 33-19 
Camp Ground Lake, Ky. (ORL) 24-21 
Camp Perry, Ohio (NCB) 32-37 
Campbells Island, Ill. (NCR) 28-16 
Campti-Clarence Area in Natchitoches Parish, La. 
(LMN) (LMK) 11-16, 12-17, 12-19 
Canal Point, Fla. (SAJ) 9-47 
Canapitsit Channel, Mass. (NED) 1-38 
Canaveral Harbor, Fla. (SAJ) 9-3, 9-25, 9-32, 9-42 
Candy Lake, Okla. (SWT) 19-3, 19-9, 19-13 
Cane River, La. (LMN) 11-14 
Caney Fork River, Tenn. (ORN) 23-13 
Canisteo, N.Y. (NAB) 4-14, 4-25 
Cannelton, Ind. (ORL) 24-20, 24-24, 24-29 
Cannelton Locks and Dam, Ind. (ORD) 22-3, 22-9 
Cannon, Clarence, Dam and Reservoir, Mo. (LMS) 
14-8, 14-10, 14-12 
Canoe Creek, Henderson, Ky. (ORL) 24-20 
Canton, Mass. (NED) 1-22, 1-43 
Canton, Mo. (NCR) 28-14, 28-16 
Canton Lake, Okla. (SWL) (SWT) 18-22, 19-3, 
19-9, 19-14, 19-17 
Canton (Nimishillen), Ohio (ORH) 25-22 
Canyon Lake, Tex. (SWF) 16-4, 16-15, 16-19 
Cape Charles City Harbor, Va. (NAO) 5-3, 5-14, 
5-18 
Cape Cod Canal, Mass. (NED) 1-3, 1-25, 1-33, 
1-53 
Cape Fear River, N.C., above Wilmington (SAW) 
6-5, 6-18 
Cape Fear River Basin, N.C. (SAW) 6-10, 6-30 
Cape Florida State Park, Fla. (SAJ) 9-47 
Cape Girardeau, Mo., No. 2 (LMS) 14-14 
Cape Girardeau, Mo., Reaches Nos. 1, 3 and 4 
(LMS) 14-14 
Cape Henry Channel, Va. (NAO) 5-2, 5-18 
Cape Lookout, N.C. (SAW) 6-28 
Cape May City, N.J. (NAP) 3-23 
Cape May Inlet, N.J. (NAP) 3-21 
Cape Porpoise Harbor, Maine (NED) 1-38 
Cape Vincent Harbor, N.Y. (NCB) 32-35 
Captain Anthony Meldahl Locks and Dam, Ky. 
(ORD) 22-3, 22-8 
Carbon Canyon Dam and Channel (SPL) 33-24 
Carden's Bottom Drainage District No. 2, Arkansas 
River, Ark. (SWL) 18-17 
Carl L. Estes Dam and Lake, Tex. (SWF) 16-22 
Carlyle Lake, Ill. (LMS) 14-14 
Carolina Beach and Vicinity, N.C. (SAW) 6-11, 
6-20, 6-31 
Carr Fork Lake, Ky. (ORL) 24-7, 24-15, 24-27 
Carrabelle Bar and Harbor, Fla. (SAM) 10-42 
Carrabelle, Fla. (SAM) 10-44, 10-45 
Carroll County Levee and Drainage District, Ill. 
(NCR) 28-16 
Carrollton, Ky. (ORL) 24-22, 24-25 
Carters Creek, Va. (NAO) 5-23 
Carters Lake, Ga. (SAM) 10-19, 10-29 
Caruthersville Harbor, Mo. (LMM) 13-5 
Carvers Harbor, Vinalhaven, Maine (NED) 1-38 
Carvins Creek, Roanoke, Va. (SAW) 6-31 
Cascadia Lake, Oreg. (NPP) 37-42, 37-49 
Caseville Harbor, Mich. (NCE) 31-61, 31-62 
Caseyville, Ky. (ORL) 24-21, 24-24 
Cashie River, N.C. (SAW) 6-25 
Cassville Harbor, Wis. (NCD) 29-7 
Castine, Maine (NED) 1-22 
Castle Rock, Wash. (NPP) 37-42 
Castlewood Lake, Colo. (MRO) 21-16 
Catching Inlet Drainage District, Oreg. (NPP) 37-42 
Cathance River, Maine (NED) 1-38 
Catherine Creek, Oreg. (NPW) 39-2, 39-9, 39-11, 
39-17 
Catherine Creek Lake, Oreg. (NPW) 39-14 
Cathlamet, Wash. (NPP) 37-39 
Cattaraugus Creek, N.Y. (NCB) 32-35 
Cattaraugus Harbor, N.Y. (NCB) 32-3, 32-18 
Cattlettsburg, Ky. (ORH) 25-20, 25-22 
Cave Run Lake, Ky. (ORL) 24-7, 24-15, 24-27 
Cave-In-Rock, Ill. (ORL) 24-22, 24-25 
Cayuga Creek, Cheektowaga, N.Y. (NCB) 32-37 
Cecil M. Harden Lake, Ind. (ORL) 24-7,24-15,24-27 
Cedar Bayou, Tex. (SWG) 15-27 
Cedar Canyon Dam, S. Dak. (MRO) 21-16 
Cedar Creek, Sussex City, Del. (NAP) 3-21 
Cedar Keys Harbor, Fla. (SAJ) 9-45, 9-46 
Cedar Point, Ga. (SAS) 8-16 
Cedar Point Lake, Kans. (SWT) 19-15 
Cedar River, Wash. (NPS) 38-26 
Cedar River Harbor, Mich. (NCE) 31-62 
Cedars Lock and Dam, Wis. (NCE) 31-60 
Celina Dam, Ky. (ORN) 23-14 
Center Hill Lake, Ohio River Basin, Tenn. (ORN) 
23-6, 23-9, 23-18 
Central and Southern Florida (SAJ) 9-21, 9-30, 
9-40, 9-47, 9-48, 9-49, 9-50, 9-51 
Central City Lake, Iowa (NCR) 28-16 
Ceredo-Kenova, W. Va. (ORH) 25-20, 25-22 
Chambersburg, Ohio (ORH) 25-21 
Channel between North and South Hero Island, 
Lake Champlain, Vt. (NAN) 2-34 
Channel Clearing and Snagging on Willamette River 
and Major Tributaries, (NPP) 37-49 
Channel Connecting Plain Dealing Creek and Oak 
Creek, Md. (NAB) 4-37 
Channel Connecting Thoroughfare Bay with Cedar 
Bay, N.C. (SAW) 6-25 
Channel Connecting York River, Va. with Back 
Creek to Slaights Wharf (NAO) 5-23 
Channel from Back Sound to Lookout Bight, N.C. 
(SAW) 6-5, 6-18 
I-6

INDEX 
Channel from Naples to Big Marco Pass, HFla. (SAJ) 
9-4, 9-25, 9-32 
Channel from Pamlico Sound to Rodanthe, N.C. 
(SAW) 6-25 
Channel from Phoebus, Va. to Deep Water in 
Hampton Roads (NAO) 5-23 
Channel Improvements for Flood Control and Major 
Drainage on 16 Streams Tributary to Willamette 
River (NPP) 37-49 
Channel Islands Harbor, Calif. (SPL) 33-18, 33-22 
Channel to Liberty, Tex. (SWG) 15-8 
Channel to Newport News, Va. (NAO) 5-23 
Channel to Port Bolivar, Tex. (SWG) 15-2, 15-13, 
15-16, 15-34 
Channels in the Straits of MacKinac (NCE) 31-62 
Chapel Hill, N.C. (SAW) 6-31 
Chaplin River, Perryville, Ky. (ORL) 24-20 
Charenton Drainage and Navigation Canal (MR+T) 
42-50 
Chariton River, Mo. (1944 Act) (MRK) 20-17 
Chariton- Little Chariton Basin, Mo. (1965 Act) 
(MRK) 20-17 
Charles River Dam, Mass. (NED) 1-22, 1-43 
Charles River (Natural Valley Storage Areas), Mass. 
(NED) 1-11, 1-27, 1-36 
Charleston Channel, Oreg. (NPP) 37-39 
Charleston Harbor, S.C. (SAN) 7-2, 7-9, 7-11, 
7-15, 7-17 
Charlestown, N.H. (NED) 1-22, 1-43, 1-49 
Charlevoix Harbor, Mich. (NCE) 31-3, 31-33, 
31-46 
Charlotte Harbor, HFla. (SAJ) 9-4, 9-25, 9-32 
Chartiers Creek, Pa. (ORP) 26-3, 26-13, 26-28 
Chaska, Minn. (NCS) 27-5, 27-19 
Chatfield Lake, Colo. (MRO) 21-2, 21-10, 21-13 
Chatham (Stage) Harbor, Mass. (NED) 1-38, 1-53 
Chattahoochee River, Eufaula, Ala. (SAM) 10-14, 
10-38 
Chattanooga, Tenn. and Rossville, Ga. (ORN) 23-13 
Chattooga Dams and Lakes, Ga. and S.C. (SAS) 
8-17 
Cheat River, W. Va. (ORP) 26-21 
Cheatham Lock and Dam, Tenn. (ORN) 23-14 
Cheboygan Harbor, Mich. (NCE) 31-4, 31-33, 
31-46 
Cheesequake Creek, N.J. (NAN) 2-33, 2-37 
Chefuncte River and Bogue Falia, La. (LMN) 11-14 
Chehalis River, Wash. (NPS) 38-12, 38-26 
Chelsea Street Highway Bridge, Mass. (NED) 1-9 
Chena River Lakes, Alaska (NPA) 40-5, 40-9, 
40-12 
Cheney Reservoir, Kans. (SWT) 19-18 
Cherry and Red Fork Creeks Channel Improvement, 
Okla. (SWT) 19-15, 19-17, 19-18 
Cherry Creek Lake, Colo. (MRO) 21-3, 21-10, 
21-13, 21-19 
Cherryfield, Maine (NED) 1-22, 1-43 
Chesapeake, Ohio (ORH) 25-20 
Chesconessex Creek, Va. (NAO) 5-23 
Cheshire, Ohio (ORH) 25-21 
Chester, Calif. (SPK) 35-31 
Chester River, Md. (NAB) 4-4, 4-22, 4-28 
Chester River, Pa. (NAP) 3-21 
Chester River at Chester, Pa. (NAP) 3-13 
Chetco River, Oreg. (NPP) 37-2, 37-24, 37-31 
Chewaucan River, Oreg. (NPP) 37-42 
Chicago Harbor, Ill. (NCC) 30-3, 30-9, 30-11, 
30-14, 30-15 
Chicago River, Ill. (NCC) 30-3, 30-9, 30-11,30-14 
Chicago River, Ill. (North Branch) (NCC) 30-6, 
30-10 
Chickamauga Lock and Dam, Tenn. (ORN) 23-17 
Chickasaw Bogue Creek, U.S. Highway 43 Bridge, 
Linden, Ala. (SAM) 10-43 
Chicopee, Mass. (NED) 1-22, 1-43, 1-45, 1-49 
Chicopee Falls, Mass. (NED) 1-43, 1-49 
Chief Joseph Dam-Rufus Woods Lake, Wash. (NPS) 
38-10, 38-17, 38-23 
Chignik, Alaska (NPA) 40-15 
Chillicothe, Ohio (ORH) 25-3, 25-12, 25-16, 
25-22 
Chilo, Ohio (ORH) 25-21 
Chincoteague Bay, Va. (NAO) 5-23 
Chincoteague Harbor of Refuge, Va. (NAO) 5-23 
Chincoteague Inlet, Va. (NAO) 5-4, 5-14, 5-18 
Chino Canyon Improvements, Palm Springs, Calif. 
(SPL) 33-24 
Chippewa Harbor, Isle Royale, Mich. (NCE) 31-62 
Chittenango Creek and Tributaries, N.Y. (NCB) 
32-37 
Choctaw Bayou and Tributaries, La. (LMN) 11-16 
Choctawhatchee Bay to Pensacola Bay, HFla. (SAM) 
10-35 
Choctawhatchee Bay to West Bay, HFla. (SAM) 
10-35 
Choctawhatchee River, HFla. and Ala. (SAM) 10-42 
Choptank River, Md. (NAB) 4-33 
Chouteau Lock and Dam, Okla. (SWL) (SWT) 
18-20, 19-16 
Chouteau, Nameoki, and Venice Drainage and Levee 
District, Ill. (LMS) 14-14 
Chowan River, N.C. (NAO) 5-23 
Chowan River, N.C. (SAW) 6-25 
Christiansted Harbor, V.I. (SAJ) 9-45, 9-46 
Cibolo Creek, Tex. (SWA) 17-7, 17-10 
Cincinnati, Ohio (ORL) 24-20, 24-22, 24-24, 
24-25, 24-29 
Cincinnatus, N.Y. (NAB) 4-39 
City Creek Levee, Calif. (SPL) 33-19 
City of Aurora, Colo. (MRO) 21-16 
Clackamas River at Dixon Farm Location, Oreg. 
(NPP) 37-42 
I-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Claiborne County Port, Miss. (LMK) 12-14 
Claiborne Harbor, Md. (NAB) 4-5, 4-22, 4-29 
Claiborne Lock and Dam, Ala. (SAM) 10-19, 10-30 
Clallam Bay, Wash. (NPS) 38-26 
Clallam River, Wash. (NPS) 38-26 
Clanton, Ala. (SAM) 10-43 
Claremont Lake, N.H. (NED) 1-45 
Clarence Cannon Dam and Reservoir, Mo. (LMS) 
14-8, 14-10, 14-12 
Clarence J. Brown Dam and Reservoir, Ohio (ORL) 
24-8, 24-15 
Clarendon to Laconia Circle, Ark. (LMM) 13-6 
Clarington, Ohio (ORP) 26-23 
Clark Fork River, Mont. (NPS) 38-26 
Clark Point Beach, New Bedford, Mass. (NED) 
1-42 
Clarks Hill Lake, Ga. and S.C. (SAS) 8-8, 8-11, 
8-15, 8-17 
Clarkson, Nebr. (MRO) 21-16, 21-20 
Clarksville, Ark. (SWL) 18-17 
Clatskanie Drainage District 1, Oreg. (NPP) 37-44, 
37-48 
Clatskanie River, Oreg. (NPP) 37-39 
Clatskanie River Area, Oreg. (NPP) 37-44, 37-48 
Clatsop County Diking District 3, Oreg. (NPP) 
37-44 
Clatsop County Diking District 4, Oreg. (NPP) 
37-44, 37-48 
Clatsop County Diking District 6, Oreg. (NPP) 
37-44, 37-48 
Clatsop County Drainage District 1, Oreg. (NPP) 
37-44, 37-48 
Clear and Burnt River, Oreg. (NPW) 39-2, 39-9, 
39-11 
Clear Creek, Tex. (SWG) 15-10, 15-14, 15-25 
Clear Creek and Clear Lake, Tex. (SWG) 15-27 
Clear Creek Drainage and Levee District, Ill. (LMS) 
14-14 
Clear River, Burrillville, R.I. (NED) 1-10, 1-23, 
1-27, 1-36, 1-48 
Clearwater Lake, Mo. (SWL) 18-4, 18-11, 18-24 
Clearwater Pass, Fla. (SAJ) 9-45, 9-46 
Clearwater River, Idaho (NPW) 39-17 
Clearwater River, Wash. (NPS) 38-26 
Clesson Brook, Buckland, Mass. (NED) 1-23 
Cleveland and Lakewood, Ohio (NCB) 32-36 
Cleveland Harbor, Ohio (NCB) 32-3, 32-18, 32-26 
Cleves, Ohio (ORL) 24-22, 24-25 
Clewiston, Fla. (SAJ) 9-47 
Cliff Walk, Newport, R.I. (NED) 1-42 
Clifton,-W. Va. (ORH) 25-21 
Clifty Creek Lake, Ind. (ORL) 24-22 
Clinch River, Tenn., and Va. (ORN) 23-13 
Clinton, Ind. (ORL) 24-22, 24-25 
Clinton, Iowa (NCR) 28-14, 28-16 
Clinton Harbor, Conn. (NED) 1-38, 1-53 
Clinton Harbor, Iowa (NCD) 29-7 
Clinton Lake, Kans. (MRK) 20-2, 20-10, 20-13 
Clinton River, Mich. (NCE) 31-4, 31-33, 31-46 
Cloverport, Ky. (ORL) 24-21, 24-24 
Clyde, R.I. (NED) 1-45 
Clyde Park, Mont. (MRO) 21-19 
Coal Creek and Tributaries (Lake City), Tenn. 
(ORN) 23-13 
Coal Creek Drainage and Levee District, Ill. (NCR) 
28-14, 28-16 
Coal Grove, Ohio (ORH) 25-20 
Coal River, W. Va. (ORH) 25-20 
Coan River, Va. (NAB) 4-37 
Coast of California, Point Mugu to San Pedro 
Breakwater, Calif. (SPL) 33-18 
Coastal Engineering Research Center (CERC) 45-1 
Coasters Island Harbor, R.I. (NED) 1-38 
Cobscook Bay, Maine (NED) 1-38 
Cocheco River, N.H. (NED) 1-38, 1-43 
Cochiti Lake, N. Mex. (SWA) 17-3, 17-8, 17-10 
Cochrane, Wis. (NCS) 27-27 
Cockrells Creek, Va. (NAO) 5-23 
Coeur D'Alene, Idaho (NPS) 38-26 
Cohansey River, N.J. (NAP) 3-2, 3-14, 3-15, 3-18 
Cohasset Harbor, Mass. (NED) 1-38 
Colchester, Conn. (NED) 1-22 
Cold Regions Research Engineering Laboratory 
(CRREL) 52-1 
Cold Spring Inlet, N.J. (NAP) 3-2, 3-15, 3-18, 
3-21 
Colebrook River Lake, Conn. (NED) 1-13, 1-28, 
1-48 
Colfax, Wash. (NPW) 39-2, 39-9, 39-11 
Colfax, Grant Parish, La. (LMN) (LMK) 11-16, 
12-18, 12-19 
Colliers, W. Va. (ORP) 26-28 
Collinsville, Ala. (SAM) 10-43 
Colonial Beach, Va. (NAB) 4-11, 4-24, 4-32 
Colorado River, Matagorda, Tex. (SWG) 15-11, 
15-27 
Colorado Springs, Colo. (Templeton Gap Floodway) 
(SWA) 17-7, 17-10 
Columbia, La. (LMK) 12-13, 12-16 
Columbia and Lower Willamette Rivers below 
Vancouver, Wash., and Portland, Oreg. (NPP) 
37-2, 37-24, 37-31, 37-45 
Columbia Drainage and Levee District No. 3, Ill. 
(LMS) 14-14 
Columbia Drainage District 1, Oreg. (NPP) 37-41, 
37-48 
Columbia River and Tributaries above Celilo Falls to 
Kennewick, Wash. (NPW) 39-14 
Columbia River at Baker Bay, Wash. (NPP) 37-4, 
37-24, 37-32 
Columbia River at the Mouth, Oreg. and Wash. 
(NPP) 37-4, 37-24, 37-32 
I-8

INDEX 
Columbia River Basin, Local Flood Protection 
Projects (NPW) 39-2, 39-11, 39-16 
Columbia River Basin, Local Protection Projects, 
Idaho, Mont., and Wash. (NPS) 38-26, 38-30 
Columbia River between Chinook, Wash., and Head 
of Sand Island (NPP) 37-4, 37-24, 37-32 
Columbia River between Vancouver, Wash., and The 
Dalles, Oreg. (NPP) 37-4, 37-24, 37-32 
Columbia River, Ilwaco, Wash. (NPP) 37-5, 37-24, 
37-33 
Columbia River Treaty Entities 49-2 
Columbia River Treaty Permanent Engineering 
Board 49-2 
Columbia River, Wenatchee to Kettle Falls, Wash. 
(NPS) 38-25 
Columbia Slough, Oreg. (NPP) 37-44 
Columbus, Nebr. (MRO) 21-20, 21-21 
Columbus, Ohio (ORH) 25-21 
Compo Beach, Westport, Conn. 1-42 
Conant Brook Dam, Mass. (NED) 1-13, 1-28, 1-48 
Conchas Lake, N. Mex. (SWA) 17-2, 17-8 
Concordia, Ky. (ORL) 24-21, 24-24 
Conemaugh River Lake, Pa. (ORP) 26-6, 26-14, 
26-18, 26-27 
Conesus Lake, Livonia, N.Y. (NCB) 32-16, 32-22 
Conetoe Creek, N.C. (SAW) 6-27 
Coney Island Channel, N.Y. (NAN) 2-33 
Coney Island Creek, N.Y. (NAN) 2-33, 2-37 
Coney Island Inlet, N.Y. (NAN) 2-34 
Conklin-Kirkwood, N.Y. (NAB) 4-19, 4-36, 4-39 
Conneaut Harbor, Ohio (NCB) 32-4, 32-18, 32-27 
Connecticut River (above Hartford), Conn. (NED) 
1-38 
Connecticut River Basin, Vt., N.H., Mass. and Conn. 
(NED) 1-11, 1-23, 1-48 
Connecticut River below Hartford, Conn. (NED) 
1-4, 1-25, 1-33, 1-45, 1-53 
Connecticut River, Comish, N.H. (NED) 1-23 
Connecticut River, North Stratford, N.H. (NED) 
1-23, 1-43 
Connecticut River, W. Stewartstown, N.H. (NED) 
1-43 
Connecticut River, Walpole, N.H. (NED) 1-23 
Connell, Wash. (NPW) 39-14 
Conoho Creek, N.C. (SAW) 6-28 
Consolidated Diking and Improvement District 1, 
Cowlitz County, Wash. (NPP) 37-40 
Construction Engineering Research Laboratory 
(CERL) 50-1 
Construction of Locks and Dams, Ohio River (ORD) 
22-1, 22-5, 22-6 
Contentnea Creek, N.C. (SAW) 6-25, 6-27, 6-28 
Conway County Drainage - Levee District No. 1, 
Arkansas River, Ark. (SWL) 18-17 
Conway County Levee District No. 6, Arkansas 
River, Ark. (SWL) 18-17 
Conway County Levee Districts Nos. 1, 2, - 8, 
Arkansas River, Ark. (SWL) 18-17 
Cook Inlet Shoals, Alaska (NPA) 40-13 
Cooper Lake and Channels, Tex. (LMN) (SWF) 
11-16, 16-5, 16-15, 16-19 
Cooper River, N.J. (NAP) 3-21 
Cooper River, Charleston Harbor, S.C. (SAN) 7-3, 
7-9, 7-12 
Cooper River, Pompion Hill Chapel, S.C. (SAN) 7-8, 
7-10, 7-14 
Cooper River Seismic Modification, S.C. (SAN) 7-4, 
7-9, 7-12 
Coordinating Committee on Great Lakes Basic 
Hydraulic and Hydrologic Data Board 31-30, 
49-2 
Coos and Millicoma Rivers, Oreg. (NPP) 37-6, 
37-25, 37-33 
Coos Bay, Oreg. (NPP) 37-5, 37-24, 37-33 
Coosa River Navigation, Ala. (SAM) 10-20, 10-30 
Copan Lake, Okla. (SWT) 19-3, 19-9, 19-14, 
19-17 
Copes Corner Lakes, New York (NAB) 4-37 
Coquille River, Oreg. (NPP) 37-6, 37-25, 37-33, 
37-44 
Coralville Lake, Iowa (NCR) 28-4, 28-8, 28-12 
Coraopolis, Pa. (ORP) 26-23 
Corbin, Ky. (ORN) 23-19 
Corbin (Lynn Camp Creek), Ky. (ORN) 23-13 
Cordell Hull Lock and Dam, Tenn. (ORN) 23-14 
Cordova Harbor, Alaska (NPA) 40-13 
Cordova Small Boat Harbor, Alaska (NPA) 40-2, 
40-8, 40-11 
Core Creek, N.C. (SAW) 6-27 
Corea Harbor, Maine (NED) 1-38 
Corning, N.Y. (NAB) 4-14, 4-25 
Corning-Monkey Run, N.Y. (NAB) 4-39 
Cornucopia Harbor, Wis. (NCE) 31-4, 31-33, 
31-46 
Corpus Christi, Tex., Channel to Navy Seaplane 
Base, Encinal Peninsula (SWG) 15-27 
Corpus Christi Beach, Tex. (Restoration Project) 
(SWG) 15-9, 15-14, 15-25 
Corpus Christi Ship Channel, Tex. (SWG) 15-3, 
15-13, 15-16, 15-28, 15-29, 15-34 
Corsica River, Md. (NAB) 4-33 
Corson Inlet and Ludlam Beach, N.J. (NAP) 3-23 
Corte Madera Creek, Calif. (SPK) (SPN) 34-3, 
35-6, 35-23, 35-28 
Cortland, N.Y. (NAB) 4-36, 4-39 
Cottage Grove Lake, Oreg. (NPP) 37-12, 37-27, 
37-36, 37-47, 37-49 
Cottonwood Creek, Calif. (SPK) 35-21, 35-27 
Cottonwood Creek Community Church, Idaho 
(NPW) 39-14 
Cottonwood Creek Dam, Boise, Idaho (NPW) 39-16 
Cottonwood River, Culdesac, Idaho (NPW) 39-17 
I-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Cottonwood Slough Pumping Plant, Ill. (LMN) 13-6 
Cotuit Harbor, Mass. (NED) 1-45 
Cougar Lake, Oreg. (NPP) 37-18, 37-28, 37-37, 
37-47, 37-49 
Council Bluffs, Iowa (MRO) 21-16, 21-19, 21-21 
Council Grove Lake, Kans. (SWT) 19-3, 19-9, 
19-14, 19-17 
County Road Bridge Over Leaf River, Miss. (SAM) 
10-14 
Courtenay Channel, Fla. (SAJ) 9-45, 9-46 
Cove Island, Stamford, Conn. (NED) 1-42 
Covered Bridge, Housatonic River, Sheffield, Mass. 
(NED) 1-17, 1-23, 1-30 
Covington, Ky. (ORL) 24-20, 24-24, 24-29 
Cow Castle Creek, S.C. (SAN) 7-8, 7-16 
Cow Creek Channel Improvement, Kans. (SWT) 
19-15 
Cowanesque Lake, Pa. (NAB) 4-17, 4-26 
Cowlitz County Consolidated Diking Improvement 
District 1, Wash. (NPP) 37-41, 37-44, 37-48 
Cowlitz County Diking Improvement Districts 2, 13, 
and 15, Wash. (NPP) 37-41, 37-48 
Cowlitz County Drainage Improvement District 1, 
Wash. (NPP) 37-41 
Cowlitz River, Wash. (NPP) 37-23, 37-39, 37-41 
Cowlitz River at Randle, Wash. (NPP) 37-44 
Cowpens Swamp, S.C. (SAN) 7-8, 7-16 
Coyote and Spencer Creeks, Oreg. (NPP) 37-44 
Coyote Creek, Calif. (SPK) 35-31 
Coyote Valley Dam (Lake Mendocino) and Channel 
Improvements, Calif. (SPK) 35-34, 35-35 
Crabtree Creek and Tributaries, Wake County, N.C. 
(SAW) 6-31 
Crabtree Swamp, S.C. (SAN) 7-8, 7-16 
Craig Harbor, Alaska (f ') 40-13, 40-15 
Crane Creek Drainage d Levee District (NCR) 
28-14, 28-16 
Crane Creek State Park, Ohio (NCB) 32-39 
Cranes Creek, Va. (NAO) 5-4, 5-14, 5-18 
Crawford County Levee District, Arkansas River, 
Ark. (SWL) 18-17 
Creede, Willow Creek, Colo. (Floodway) (SWA) 
17-7 
Crescent City Harbor, Calif. (SPN) 34-5 
Criehaven Harbor, Maine (NED) 1-38 
Crisfield Harbor, Md. (NAB) 4-33, 4-38 
Crooked Creek Lake, Pa. (ORP) 26-6, 26-14, 
26-18, 26-27 
Crooked Creek Lake - Levee, Ark. (SWL) 18-17 
Cross-Florida Barge Canal (SAJ) 9-4, 9-25, 9-32, 
9-42, 9-43 
Cross Rip Shoals Nantucket Sound, Mass. (NED) 
1-38 
Crutcho Creek Channel Improvement, Okla. (SWT) 
19-15 
Crystal River, Fla. (SAJ) 9-45, 9-46 
Cucamonga Creek, Calif. (SPL) 33-3, 33-10, 
33-15 
Cuckold Creek, Md. (NAB) 4-37 
Cuivre River, Mo. (LMS) 14-13 
Cumberland, Ky. (ORN) 23-18 
Cumberland, Md., and Ridgeley, W. Va. (NAB) 4-12, 
4-24, 4-32, 4-39 
Cumberland River, Tenn. and Ky. (ORN) 23-2, 
23-9, 23-11, 23-15 
Cummings Park, Stamford, Conn. (NED) 1-42 
Cunninghill Cove, Md. (NAB) 4-37 
Current River, Ark. - Mo. (SWL) 18-16 
Curry Creek Dam and Lake, Ga. (SAS) 8-16 
Curwensville Lake, Pa. (NAB) 4-18, 4-26 
Cushman-Mapleton Channels Oreg. (NPP) 37-39 
Cuttyhunk Harbor, Mass. (NED) 1-38, 1-53 
Cuyahoga River Basin, Ohio (NCB) 32-37 
Cypress Bayou and Waterway between Jefferson, 
Tex., and Shreveport, La. (LMN) (LMK) 11-14, 
12-14 
Cypress Creek, Ky. (ORL) 24-30 
Cypress Creek, Md. (NAB) 4-33 
D 
Dade County, Fla. (SAJ) 9-18, 9-29, 9-40 
Dade County, North of Haulover Beach, Fla. (SAJ) 
9-19, 9-29, 9-40 
Dale Hollow Lake, Ohio River Basin, Tenn. and Ky. 
(ORN) 23-7, 23-9, 23-18 
Dallas Floodway, Tex. (SWF) 16-22 
Dam "A" Lake, Tex. (SWF) 16-13, 16-19 
Dam Neck Disposal Area, Va. (NAO) 5-25 
Dam Safety Program, New York District (NAN) 
2-20 
Damariscotta River, Maine (NED) 1-38 
Dana Point Harbor, Calif. (SPL) 33-18, 33-22 
Danbury, Conn. (NED) 1-22, 1-43, 1-50 
Dansville and Vicinity, N.Y. (NCB) 32-37 
Danville, Va. (SAW) 6-31 
Dardanelle Lock - Dam, Ark. (SWL) 18-8, 18-13, 
18-20 
Darien Harbor, Ga. (SAS) 8-16 
Dashields Locks and Dam, Pa. (ORD) 22-3, 22-7 
Data Collection and Management Division, 53-1 
Dauphin Island Bay, Ala. (SAM) 10-6, 10-27, 
10-34, 10-45 
Davenport, Iowa (NCR) 28-4, 28-8, 28-12 
Davenport Center Lake, N.Y. (NAB) 4-37 
Davenport Harbor, Iowa (Lindsay Park) (NCD) 
29-7 
David D. Terry Lock - Dam, Ark. (SWL) 18-2, 18-19 
Davids Creek Lake, Iowa (MRO) 21-16 
Davis, N.C. (SAW) 6-28 
Davis Creek, Va. (NAO) 5-23 
I-10

INDEX 
Day, John, Lock and Dam-Lake Umatilla, Oreg. and 
Wash. (NPP) 37-20, 37-28, 37-38, 37-51 
Day, John, River, Oreg. (NPP) 37-14, 37-27, 
37-36, 37-40, 37-44 
Days Creek Lake, Oreg. (NPP) 37-42 
Dayton, Ky. (ORL) 24-3, 24-14, 24-24, 24-29 
Dayton, Wash. (NPW) 39-14 
Dayton, Wyo. (MRO) 21-18 
Daytona Beach Side Channel, Fla. (SAJ) 9-45 
De Kalb, Ill. (NCR) 28-16 
Deadman's Gulch, Sturgis, S.D. (MRO) 21-17 
Deep Creek, N.C. (SAW) 6-27 
Deep Creek, Accomack Co., Va. (NAO) 5-23 
Deep Creek, Newport News, Va. (NAO) 5-23 
Deep Fork River, Okla. (SWT) 19-17 
Deep River, Wash. (NPP) 37-39 
Deep River Area, Wash. (NPP) 37-40 
Deer Creek Lake, Ohio (ORH) 25-4, 25-12, 25-16 
Deer Creek Prairie Levee, Ind. (ORL) 24-22, 24-25 
Deer Island Area, Oreg. (NPP) 37-40 
Deer Island Drainage District, Oreg. (NPP) 37-41, 
37-48 
Deer Island Thoroughfare, Maine (NED) 1-38 
Degognia and Fountain Bluff Levee and Drainage 
District, Ill. (LMS) 14-14 
DeGray Lake, Ark. (LMK) 12-16, 12-19 
DeKalb, Ill. (NCR) 29-16 
Delaware Coast Protection, Del. (NAP) 3-11, 3-17 
Delaware Lake, Ohio (ORH) 25-4, 25-12, 25-16 
Delaware River, Pa., N.J. and Del., Philadelphia to 
the Sea (NAP) 3-4, 3-15, 3-18 
Delaware River at Camden, N.J. (NAP) 3-21 
Delaware; River at East Branch, N.Y. (NAP) 3-13 
Delaware River at Pennsville, N.J. (NAP) 3-21 
Delaware River between Philadelphia, Pa., and 
Trenton, N.J. (NAP) 3-3, 3-15, 3-18 
Deleware River, Mouth of Neversink (NAP) 3-24 
Delphi, Ind. (ORL) 24-20, 24-24, 24-29 
Denison Dam-Lake Texoma, Tex. and Okla. (SWT) 
19-13 
Dennis Creek, N.J. (NAP) 3-21 
Depere Lock and Dam, Wis. (NCE) 31-60 
Depoe Bay, Oreg. (NPP) 37-7, 37-25, 37-33, 
37-39, 37-42, 37-45 
Dequeen Lake, Ark. (SWL) 18-5, 18-11, 18-23 
Derby, Conn. (NED) 1-22, 1-43, 1-50 
Derby, Ind. (ORL) 24-22, 24-25 
Des Moines, Iowa (NCR) 28-14, 28-16 
Des Moines and Mississippi Levee District No. 1, 
Mo. (NCR) 28-14, 28-16 
Des Moines Recreational River and Greenbelt, Iowa 
(NCR) 28-4, 28-8, 28-12 
Deschutes River, Wash. (NPS) 38-26 
Detour Harbor, Mich. (NCE) 31-4, 31-34, 31-47 
Detroit Lake, Oreg. (NPP) 37-19, 37-28, 37-37, 
37-47, 37-49 
Detroit River, Mich. (NCE) 31-5, 31-34, 31-47, 
31-58, 31-63 
Devils Lake, N. Dak. (NCS) 27-5, 27-19 
Devil's Swamp, La. (MR+T) 42-5, 42-29 
Dewey Lake, Ky. (ORH) 25-4, 25-13, 25-16 
Dickey Lake, Maine (NED) 1-45 
Dickinson Bayou, Tex. (SWG) 15-27 
Dierks Lake, Little River Basin, Ark. (SWL) 18-5, 
18-12, 18-23 
Diking and Improvement District 4, Wahkiakum 
County, Wash. (NPP) 37-40 
Diking and Improvement District 5, Cowlitz County, 
Wash. (NPP) 37-40 
Diking and Improvement District 11, Cowlitz 
County, Wash. (NPP) 37-41 
Diking Districts 1 and 3 (Puget Island) and Little 
Island, Wash. (NPP) 37-40 
Diking Districts 2, 3, and 5, Clatsop County, Oreg. 
(NPP) 37-40 
Diking Improvement District 1, Pacific County, 
Wash. (NPP) 37-40 
Dilking Improvement Districts 2 and 13, Cowlitz 
County, Wash. (NPP) 37-41 
Dillingham Emergency Bank Stabilization, Alaska 
(NPA) 40-5, 40-9, 40-12 
Dillingham Harbor, Alaska (NPA) 40-2, 40-8, 
40-11, 40-15 
Dillon Lake, Ohio (ORH) 25-4, 25-13, 25-16 
Dillonvale, Ohio (Short Creek) (ORP) 26-23 
Dismal Swamp Canal (Deep Creek), Va. (NAO) 
5-22 
Dismal Swamp Canal (South Mills, N.C.) (NAO) 
5-22 
Dively Drainage - Levee District, Ill. (LMS) 14-14 
Dodge City, Kans. (SWT) 19-17 
Dog and Fowl Rivers, Ala. (SAM) 10-7, 10-27, 
10-34 
Doheny Beach State Park (Doheny State Beach), 
Calif. (SPL) 33-19 
Dorchester Bay and Neponset River, Mass. (NED) 
1-38 
Dorena Lake, Oreg. (NPP) 37-12, 37-27, 37-36, 
37-47, 37-49 
Double Bayou, Tex. (SWG) 15-27 
Double Creek, N.J. (NAP) 3-21 
Douglas Harbor, Alaska (NPA) 40-13 
Dover, Ky. (ORH) 25-20 
Downeyville Lake, Ind. (ORL) 24-21, 24-28 
Drainage District 1, Clatsop County, Oreg. (NPP) 
37-40 
Dresden Island Lock and Dam, Ill. (NCC) 28-20, 
28-21 
Drinkwater Sewer, Mo. (LMM) 13-6 
Drum Inlet, N.C. (SAW) 6-25 
Drury Drainage District, Ill. (NCR) 28-14, 28-16 
Dry Creek, Wash. (NPW) 39-14 
I-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Dry Creek, Hawarden, Iowa (MRO) 21-17 
Dry Creek (Warm Springs) Lake and Channel 
Improvements, Calif. (SPK) 35-24, 35-34, 35-35 
Dry Fork and East Fork Lakes, Mo. (MRK) 20-17 
Dry Pass, Alaska (NPA) 40-13, 40-15 
Dry Run, Iowa (NCS) 27-24 
Dubois, Pa. (ORP) 26-22, 26-28 
Dubuque, Iowa (NCR) 28-14, 28-16 
Dubuque Harbor, Iowa (NCD) 29-7 
Duck Creek, Calif. (SPK) 35-31 
Duck Creek Channel Improvement, Tex. (SWF) 16-22 
Duck Island Harbor, Conn. (NED) 1-38, 1-53 
Duck Point Cove, Md. (NAB) 4-34 
Duck River, Tenn. (ORN) 23-13 
Duluth-Superior Harbor, Minn. and Wis. (NCE) 
31-5, 31-34, 31-47 
Dune Road, Southampton, N.Y. (NAN) 2-40 
Dungeness River, Wash. (NPS) 38-8, 38-16, 
38-22, 38-26 
Dunkirk Harbor, N.Y. (NCB) 32-5, 32-19, 32-28 
Dunn Branch, Woodbine, Camden County, Ga. 
(SAS) 8-7, 8-16 
Duval County, Fla. (SAJ) 9-19, 9-29, 9-40 
Duxbury Harbor, Mass. (NED) 1-38 
Dworshak Dam and Reservoir, Idaho (NPW) 39-4, 
39-9, 39-12, 39-18 
Dyersburg, Tenn. (LMM) 13-6 
Dyersburg, Tenn. (Southwest) (LMM) 13-6 
Dymers Creek, Va. (NAO) 5-23 
E 
Eagle Bay and Fort Yates Highway Bridges, N. Dak. 
(MRO) 21-17 
Eagle Creek, S.C. (SAN) 7-7, 7-8, 7-10, 7-14 
Eagle Creek Lake, Ky. (ORL) 24-21 
Eagle Creek Reservoir, Ohio (ORP) 26-22, 26-27 
Eagle Harbor, Mich. (NCE) 31-62 
East Barre Dam, Vt. (NAN) 2-36 
East Bay (Hanna Reef), Tex. (SWG) 15-27 
East Bay Small Boat Basin, Olympia, Wash. (NPS) 
38-25 
East Boothbay Harbor, Maine (NED) 1-38 
East Branch, Clarion River Lake, Pa. (ORP) 26-6, 
26-14, 26-18, 26-27 
East Branch Dam, Conn. (NED) 1-22, 1-43, 1-49 
East Brimfield Lake, Mass. (NED) 1-21, 1-31,1-52 
East Canada Creek, Dolgeville, N.Y. (NAN) 2-39 
East Cape Girardeau and Clear Creek Drainage 
District, Ill. (LMS) 14-14 
East Chester Creek, N.Y. (NAN) 2-34 
East Fork, Tex. (SWF) 16-22 
East Fork of Boyer River, Near Vail, Iowa (MRO) 
21-21 
East Hartford, Conn. (NED) 1-22, 1-43, 1-49 
East Liverpool Drainage and Levee District (NCR) 
28-14, 28-16 
East Lynn Lake, W. Va. (ORH) 25-5, 25-13, 25-17 
East Moline, Ill. (NCR) 28-14, 28-16 
East Muddy and Lake Creek, Oreg. (NPP) 37-44 
East Muddy Creek, Mo. (MRK) 20-17 
East Nishnabotna River, Near Griswold, Iowa 
(MRO) 21-21 
East Nishnabotna River, Page Co. Bridge, Near 
Essex, Iowa (MRO) 21-21 
East Nishnabotna River, Red Oak, Iowa (MRO) 
21-3, 21-10, 21-13, 21-21 
East Pass Channel from Gulf of Mexico into 
Choctawhatchee Bay, Fla. (SAM) 10-7, 10-27, 
10-34 
East Peoria Drainage and Levee District (NCR) 
28-14, 28-16 
East Peoria Sanitary District, Ill. (NCR) 28-16 
East Point, La. (LMN) (LMK) 11-16, 12-19 
East Poplar Bluff - Poplar Bluff, Mo. (SWL) 18-17 
East Rainelle, W. Va. (ORH) 25-20, 25-22 
East River, N.Y. (NAN) 2-34 
East Rockaway (DEBS) Inlet, N.Y. (NAN) 2-37 
East Rockaway Inlet, N.Y. (NAN) 2-4, 2-22, 2-27 
East Rockaway Inlet to Rockaway Inlet and Jamaica 
Bay, N.Y. (Part I) (NAN) 2-16, 2-25, 2-31 
East Rockaway Inlet to Rockaway Inlet and Jamaica 
Bay, N.Y. (Part II) (NAN) 2-36 
East Sidney Lake, N.Y. (NAB) 4-15, 4-25 
East St. Louis and Vicinity, Ill. (LMS) 14-3, 14-9, 
14-11 
East Weaver Creek, Calif. (SPK) 35-31 
East, West and Duwamish Waterways, Seattle 
Harbor, Wash. (NPS) 38-12 
Eastchester Creek, N.Y. (NAN) 2-33 
Eastern Branch, Va. (NAO) 5-20 
Eastern Rapides and South-Central Avoyelles 
Parishes, La. (MR+T) 42-15, 42-28, 42-50, 
42-59 
Eastlake, Ohio (NCB) 32-37 
Eastman, H. V., Lake, Calif. (SPK) 35-4, 35-23 
Eastport Harbor, Maine (NED) 1-38 
Eau Galle River, Wis. (NCS) 27-6, 27-19 
Eau Gallie Harbor, Fla. (SAJ) 9-5, 9-25, 9-32 
Echo Bay Harbor, N.Y. (NAN) 2-34 
Edenton Harbor, N.C. (SAW) 6-25 
Edgar Jadwin, General, Dam and Reservoir, Pa. 
(NAP) 3-13, 3-17 
Edgartown Harbor, Mass. (NED) 1-38 
Edisto River, S.C. (SAN) 7-8, 7-15, 7-16 
Edisto River, North Fork, S.C. (SAN) 7-16 
Edisto River, Vicinity Canadays Landing, S.C. (SAN) 
7-16 
Ediz Hook, Wash. (NPS) 38-2, 38-14, 38-19 
Edmonds Harbor, Wash. (NPS) 38-2, 38-14, 
38-19 
1-12

INDEX 
Edward MacDowell Lake, N.H. (NED) 1-18, 1-30, 
1-51 
Eel River, Calif. (SPK) 35-31 
Eel River, Ind. (ORL) 24-30 
Egegik River, Alaska (NPA) 40-13 
Eight Mile Creek, Ark. (MR+T) 42-28 
Eighteen Mile Island, Ky. (ORL) 24-30 
El Dorado, Kans., W. Br., Walnut River, Channel 
Improvement (SWT) 19-15 
El Dorado Lake, Kans. (SWT) 19-4, 19-10, 19-14, 
19-17 
El Paso, Tex. (SWA) 17-2, 17-8, 17-9 
El Tuque Beach, P.R. (SAJ) 9-47 
Eldred, Pa. (ORP) 26-28 
Eldred and Spankey Drainage and Levee District, Ill. 
(LMS) 14-3, 14-9, 14-11 
Eldrid, Ill. (LMS) 14-14 
Elfin Cove, Alaska (NPA) 40-13 
Elizabeth, N.J. (NAN) 2-37 
Elizabeth River, Hillside, N.J. (NAN) 2-39 
Elizabethtown, Ill. (ORL) 24-22, 24-25 
Elk and Little Elk Rivers, Md. (NAB) 4-34 
Elk City Lake, Kans. (SWL) (SWT) 18-22, 19-4, 
19-10, 19-14, 19-16, 19-17 
Elk Creek, Clyde, Kans. (MRK) 20-17 
Elk Creek Harbor, Pa. (NCB) 32-35 
Elk Creek Lake, Oreg. (NPP) 37-12, 37-27, 37-36 
Elk River, Ala. and Tenn. (ORN) 23-13 
Elk River, Minn. (NCS) 27-24 
Elk River, W. Va. (ORH) 25-19 
Elkhorn River, Q Street Bridge, near Gretna, Nebr. 
(MRO) 21-20 
Elkhorn River, Ray Bridge, near Norfolk, Nebr. 
(MRO) 21-20 
Elkins, W. Va. (ORP) 26-4, 26-13, 26-18, 26-26 
Elkland, Pa. (NAB) 4-36, 4-39 
Elkport, Iowa (NCR) 28-14, 28-16 
Ellerbe Creek, Durham County, N.C. (SAW) 6-27 
Ellicott Creek, N.Y. (NCB) 32-14, 32-22 
Ellis Swamp, Gates County, N.C. (SAW) 6-27 
Elm Creek, Nebr. (MRO) 21-21 
Elm Fork Floodway, Tex. (SWF) 16-6, 16-15,16-19 
Elmira, N.Y. (NAB) 4-15, 4-25 
Elochoman Slough, Wash. (NPP) 37-39 
Elwha River, Wash. (NPS) 38-26 
Emergency Bank Protection Activities 
Alaska District (NPA) 40-6 
Albuquerque, N. Mex., District (SWA) 17-7 
Buffalo, N.Y., District (NCB) 32-38 
Chicago, Ill., District (NCC) 30-7 
Detroit, Mich., District (NCE) 31-25 
Huntington, W. Va., District (ORH) 25-11 
Kansas City, Mo., District (MRK) 20-7 
Little Rock, Ark., District (SWL) 18-5 
Los Angeles, Calif., District (SPL) 33-8 
Louisville, Ky., District (ORL) 24-13, 24-31 
Nashville, Tenn., District (ORN) 23-19 
New England Division (NED) 1-23 
Omaha, Neb., District (MRO) 21-7 
Philadelphia, Pa., District (NAP) 3-12 
Pittsburgh, Pa., District (ORP) 26-29 
Portland, Oreg., District (NPP) 37-13 
Rock Island, Ill., District (NCR) 28-18 
Sacramento, Calif., District (SPK) 35-19 
San Francisco, Calif., District (SPN) 34-4 
St. Louis, Mo., District (LMS) 14-8, 14-14 
St. Paul, Minn., District (NCS) 27-28 
Tulsa, Okla., District (SWT) 19-19 
Vicksburg, Miss., District (LMK) 12-8 
Walla Walla, Wash., District (NPW) 39-2 
Emergency Flood Control Activities 
Alaska District (NPA) 40-6 
Albuquerque, N. Mex., District (SWA) 17-7 
Baltimore, Md., District (NAB) 4-19 
Buffalo, N.Y., District (NCB) 32-38 
Charleston, S.C., District (SAN) 7-16 
Chicago, Ill., District (NCC) 30-7 
Detroit, Mich., District (NCE) 31-28 
Fort Worth, Tex., District (SWF) 16-12 
Galveston, Tex., District (SWG) 15-12 
Huntington, W. Va., District (ORH) 25-11 
Jacksonville, Fla., District (SAJ) 9-24 
Kansas City, Mo., District (MRK) 20-7 
Little Rock, Ark., District (SWL) 18-5 
Los Angeles, Calif., District (SPL) 33-8 
Louisville, Ky., District (ORL) 24-13 
Memphis, Tenn., District (LMM) 13-3 
Mobile, Ala., District (SAM) 10-18 
New England Division (NED) 1-23 
New Orleans District (LMN) 11-9 
New York District (NAN) 2-20 
Norfolk, Va., District (NAO) 5-12 
Omaha, Neb., District (MRO) 21-6 
Philadelphia, Pa., District (NAP) 3-12 
Portland, Oreg., District (NPP) 37-13 
Rock Island, Ill., District (NCR) 28-19 
Sacramento, Calif., District (SPK) 35-19 
San Francisco, Calif., District (SPN) 34-4 
Savannah, Ga., District (SAS) 8-7 
Seattle, Wash., District (NPS) 38-32 
St. Louis, Mo., District (LMS) 14-8 
St. Paul, Minn., District (NCS) 27-28 
Tulsa, Okla., District (SWT) 19-19 
Vicksburg, Miss., District (LMK) 12-8 
Walla Walla, Wash., District (NPW) 39-2 
Wilmington, N.C., District (SAW) 6-14 
Emergency protection for highway and railroad 
facilities at Chester, Ill., bridge (LMS) 14-14 
Emergency protection for Illinois approach, Chain 
of Rocks Bridge (LMS) 14-14 
Emergency repairs to levees on Mississippi, Illinois 
and Kaskaskia Rivers (LMS) 14-14 
1-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Emergency Streambank and Shoreline Protection 
Detroit, Mich., District (NCE) 31-25 
Jacksonville, Fla., District (SAJ) 9-24 
Little Rock, Ark., District (SWL) 18-5 
Mobile, Ala., District (SAM) 10-18 
New York, N.Y., District (NAN) 2-20 
Pittsburgh, Pa., District (ORP) 26-29 
Tulsa, Okla., District (SWT) 19-19 
Emerson, Indian Creek, Mills County, Iowa (MRO) 
21-21 
Empire-Stratton, Ohio (ORP) 26-22, 26-26 
Emsworth Locks and Dam, Pa. (ORD) 22-2, 22-7 
Enderlin, N. Dak. (NCS) 27-6, 27-19 
Endicott-Johnson City and Vestal, N.Y. (NAB) 
4-36, 4-39 
Engineer Topographic Laboratories (ETL) 51-1 
England Pond Levee, Ill. (ORL) 24-20, 24-24, 
24-29 
English, Ind. (ORL) 24-20, 24-30 
Enid, Okla. (SWT) 19-15, 19-17, 19-18 
Enid Lake, Miss. (MR+T) 42-20, 42-59 
Entiat River, Wash. (NPS) 38-26 
Ephraim Canyon Wash, Nogales, Ariz. (SPL) 33-25 
Erie Harbor, Pa. (NCB) 32-5, 32-19, 32-28, 
32-39 
Escambia and Conecuh Rivers, Fla. and Ala. (SAM) 
10-42, 10-45 
Esopus Creek, Ulster, N.Y. (NAN) 2-39 
Esquatzel Coulee, Wash. (NPW) 39-14, 39-16 
Essex River, Mass. (NED) 1-38 
Estes, Carl L., Dam and Lake, Tex. (SWF) 16-22 
Euclid Creek, Cleveland, Ohio (NCB) 32-17, 32-22 
Eufaula Lake, Okla. (SWL) (SWT) 18-22, 19-7, 
19-12, 19-14, 19-16, 19-17 
Evansdale, Iowa (NCR) 28-14, 28-16 
Evanston, Ill. (NCC) 30-15 
Evansville, Ind. (ORL) 24-3, 24-14, 24-24, 24-29 
Everett Harbor and Snohomish River, Wash. (NPS) 
38-3, 38-14, 38-19 
Everglades Harbor, Fla. (SAJ) 9-46 
Exeter River, N.H. (NED) 1-38 
Existing levees and extensions from Bastrop, La. to 
mouth of Boeuf River (LMK) 12-16 
F 
Fabius River Drainage District, Mo. (NCR) 28-14, 
28-16 
Factory Brook, Middlefield, Mass. (NED) 1-23 
Fair Haven Beach State Park, N.Y. (NCB) 32-36 
Fairbanks, Tanana River and Chena Slough, Alaska 
(NPA) 40-14 
Fairbury, Nebr. (MRK) 20-17 
Fairfield Vicinity Streams, Calif. (SPK) 35-7, 35-23 
Fairport Harbor, Ohio (NCB) 32-5, 32-19, 32-29 
Fajardo Harbor, P.R. (SAJ) 9-46 
Fall Brook Lake, Pa. (NAB) 4-37 
Fall Creek Lake, Oreg. (NPP) 37-13, 37-27, 37-36, 
37-47, 37-49 
Fall of the Ohio National Wildlife Conservation Area 
(ORD) 22-3 
Fall River Basin, S. Dak. (MRO) 21-3, 21-10, 
21-13 
Fall River Harbor, Mass. (NED) 1-38 
Fall River Lake, Kans. (SWL) (SWT) 18-22, 19-4, 
19-10, 19-14, 19-16, 19-17 
Falling Creek, Rockingham, N.C. (SAW) 6-31 
Falls Lake, N.C. (SAW) 6-12, 6-15, 6-20 
Falmouth Harbor, Mass. (NED) 1-38 
Falmouth Lake, Ky. (ORL) 24-21, 24-27 
Falulah Brook, Fitchburg, Mass. (NED) 1-23 
Fancy Bluff Creek, Ga. (SAS) 8-16 
Far Creek, N.C. (SAW) 6-25 
Fargo, N. Dak. (NCS) 27-27 
Farm Creek, Ill. (NCR) 28-5, 28-8, 28-12 
Farmers Levee and Drainage District (NCR) 28-14, 
28-15, 28-16 
Farmington, N.H. (NED) 1-22 
Faulkner County Levee District No. 1, Arkansas 
River, Ark. (SWL) 18-17 
Feather River, Calif. (SPK) 35-30 
Federal Energy Regulatory Commission (FERC) 
47-1 
Federal Energy Regulatory Commission Licenses at 
Locks and Dams, Ohio River (ORD) 22-6 
Federal Prison Creek, Ga. (SAS) 8-7 
Felsenthal, Ark. (LMK) 12-13 
Ferguson Creek, Oreg. (NPP) 37-44 
Fern Ridge Lake, Oreg. (NPP) 37-13, 37-27, 
37-36, 37-47, 37-49 
Fernandina Harbor, Fla. (SAJ) 9-5, 9-26, 9-32 
Ferrells Bridge Dam-Lake O' The Pines, Tex. 
(LMN) (SWF) 11-16, 16-6, 16-15, 16-19 
Filberts Creek, N.C. (SAW) 6-27 
Fire Island Inlet to Jones Inlet, N.Y. (NAN) 2-4, 
2-22, 2-27, 2-36 
Fire Island Inlet to Montauk Point, N.Y. (NAN) 
2-36 
Fisher, O. C., Dam and Lake, Tex. (SWF) 16-9, 
16-16, 16-20 
Fisherman's Wharf Area, San Francisco Harbor, 
Calif. (SPN) 34-1, 34-5, 34-8 
Fishing Bay, Md. (NAB) 4-34 
Fishing Creek, Md. (NAB) 4-5, 4-22, 4-29 
Fishing Creek, N.C. (SAW) 6-25 
Fishing Creek, Pine Grove, W. Va. (ORH) 25-22 
Fishtrap Lake, Ky. (ORH) 25-5, 25-13, 25-17 
Fitchburg, Mass. (NED) 1-22, 1-43 
Fivemile River Harbor, Conn. (NED) 1-38, 1-45 
Flannagan, John W., Dam and Reservoir, Va. (ORH) 
25-6, 25-13, 25-17 
1-14

INDEX 
Flat Creek, Oreg. (NPP) 37-44 
Flat Rock Creek Channel Improvement, Tulsa, Okla. 
(SWT) 19-15, 19-17, 19-18 
Flathead River, Mont. (NPS) 38-25, 38-26, 38-27 
Fletcher and Sunshine Gardens Levee, Ind. (ORL) 
24-22, 24-25 
Floating Breakwater Prototype Test Program, 
Seattle, Wash. (NPS) 38-25 
Flood Control and Coastal Emergency Activities 
Buffalo, N.Y., District (NCB) 32-38 
Huntington, W.Va., District (ORH) 25-11 
Pittsburgh, Pa., District (ORP) 26-12 
Tulsa, Okla., District (SWT) 19-19 
Flood Damage Prevention Studies, Tulsa, Okla., 
District (SWT) 19-20 
Flood Insurance Activities 
Detroit, Mich., District (NCE) 31-31 
Los Angeles, Calif., District (SPL) 33-8 
Sacramento, Calif., District (SPK) 35-19 
Flood Insurance Studies and Flood Hazard 
Information Reports, Mobile, Ala., District (SAM) 
10-49 
Floodwall and Levees at Portland, Oreg. (NPP) 
37-44 
Florence Levee, Kans. (SWT) 19-15, 19-17, 
19-18 
Floyd River, Sioux City, Iowa (MRO) 21-17 
Flushing Bay and Creek, N.Y. (NAN) 2-33, 2-34 
Fly Creek, Ala. (SAM) 10-7, 10-27, 10-35, 10-45 
Follansbee, W. Va. (ORP) 26-23 
Folly Brook, Wethersfield, Conn. (NED) 1-43, 
1-49 
Folly River, S.C. (SAN) 7-4, 7-9, 7-12 
Folsom Lake, Calif. (SPK) 35-31 
Forest Heights, Md. (NAB) 4-36, 4-39 
Forestville, Mich. (NCE) 31-62 
Forked Deer River, Tenn., including South Fork 
(LMM) 13-5 
Forsyth, Mont. (MRO) 21-17, 21-19 
Fort Chartres and Ivy Landing Drainage District No. 
5 and Stringtown Drainage and Levee District No. 
4, Ill. (LMS) 14-14 
Fort Cobb Reservoir, Okla. (SWT) 19-18 
Fort Fisher and Vicinity, N.C. (SAW) 6-17, 6-26 
Fort Gibson Lake, Okla. (SWL) (SWT) 18-22, 19-7, 
19-12, 19-14, 19-16, 19-17 
Fort Kent, Maine (NED) 1-22, 1-43 
Fort Leavenworth, Kans., Bridge Removal (MRK) 
20-16 
Fort Loudon Lock and Dam, Tenn. (ORN) 23-17 
Fort Macon State Park, N.C. (SAW) 6-26 
Fort Madison Harbor, Iowa (NCD) 29-7 
Fort Myers Beach, Fla. (SAJ) 9-5, 9-26, 9-33 
Fort Niagara State Park, N.Y. (NCB) 32-36 
Fort Peck Lake, Mont. (MRO) 21-7, 21-12, 21-15, 
21-19 
Fort Pierce, Fla. (SAJ) 9-20, 9-29, 9-40 
Fort Pierce Harbor, Fla. (SAJ) 9-6, 9-26, 9-33 
Fort Randall Dam-Lake Francis Case, S. Dak. 
(MRO) 21-8, 21-12, 21-16, 21-19 
Fort Scott Lake, Kans. (MRK) 20-17, 20-19 
Fort Smith, Arkansas River, Ark. (SWL) 18-17 
Fort Supply Lake, Okla. (SWT) 19-4, 19-10, 
19-14, 19-17 
Fort Trumbull Beach, Milford, Conn. (NED) 1-23 
Fort Worth Floodway (Clear Fork), Tex. (SWF) 
16-22 
Fort Worth Floodway (West Fork), Tex. (SWF) 
16-22 
Foss Reservoir, Okla. (SWT) 19-18 
Foster Creek Road, Wash. (NPS) 38-26 
Foster Joseph Sayers Dam, Pa. (NAB) 4-18, 4-26 
Foster Lake, Oreg. (NPP) 37-47 
Four Pole Creek, W. Va. (ORH) 25-22 
Four River Basins, Fla. (SAJ) 9-23, 9-30, 9-41, 
9-52 
Fourche Creek, Little Rock, Ark. (SWL) 18-17 
Fourmile Run, Va. (NAB) 4-36, 4-39 
Fowl River, Ala. (SAM) 10-45 
Fox Point Hurricane Barrier, R.I. (NED) 1-23, 
1-43 
Fox River, Wis. (NCE) 31-6, 31-34, 31-48 
Fox River Locks and Dams, Wis. (NCE) 31-60 
Francis E. Walter Dam, Pa. (NAP) (NAB) 3-12, 
3-17, 4-21 
Frankfort, Kans. (MRK) 20-17 
Frankfort, Ky. (ORL) 24-20, 24-21, 24-24, 24-29 
Frankfort Harbor, Mich. (NCE) 31-6, 31-34, 
31-48 
Franklin Falls Dam, N.H. (NED) 1-19, 1-30, 1-51 
Franklin, W. P., Lock and Dam, Fla. (SAM) 9-48 
Frazer-Wolf Point, Mont. (MRO) 21-17 
Frazeysburg, Ohio (ORH) 25-21 
Freeport, Ill. (NCR) 28-15 
Freeport, Pa. (ORP) 26-23 
Freeport and Vicinity, Tex. Hurricane-Flood 
Protection (SWG) 15-11, 15-27 
Freeport Harbor, Tex. (SWG) 15-3, 15-13, 15-18, 
15-28, 15-29, 15-34 
Fremont, Ohio (NCB) 32-37 
French Broad and Little Pigeon Rivers, Tenn. (ORN) 
23-13 
Frenchboro Harbor, Maine (NED) 1-38 
Freshwater Bayou, La. (LMN) 11-14 
Friday Harbor Marina, Wash. (NPS) 38-25 
Friendly, W. Va. (ORH) 25-21 
Friendsville, Md. (ORP) 26-22, 26-28 
From North Little Rock to Gillett, Ark. (Above Plum 
Bayou) (SWL) 18-17 
Fullerton, Ky. (ORH) 25-20 
Fullerton Dam, Calif. (SPL) 33-24 
Fulton, Ill. (NCR) 28-14, 28-16 
1-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY. 1987 
G 
Galax, Va. (ORH) 25-20, 25-22 
Galena, Ill. (NCR) 28-14, 28-17 
Galena Emergency Bank Stabilization, Alaska (NPA) 
40-6, 40-9, 40-12 
Galisteo Dam, N. Mex. (SWA) 17-4, 17-8 
Gallipolis Locks and Dam, W. Va. (ORD) 22-3, 
22-8 
Gallipolis, Ohio (ORH) 25-21 
Galveston Harbor and Channel, Tex. (SWG) 15-4, 
15-13, 15-19, 15-28, 15-29, 15-34 
Galveston Seawall Extension, Tex. (SWG) 15-11 
Gapway Swamp, N.C. and S.C. (SAN) (SAW) 6-27, 
7-8, 7-16 
Gardner, Mass. (NED) 1-22, 1-43, 1-49 
Gardners Creek, N.C. (SAW) 6-27 
Garland City, Ark. (LMN) (LMK) 11-16, 12-17, 
12-19 
Garnett Lake, Kans. (MRK) 20-18, 20-19 
Garrison Dam-Lake Sakakawea, N. Dak. (MRO) 
21-8, 21-12, 21-16, 21-19 
Gasconade River, Mo. (MRK) 20-16 
Gastineau Channel, Alaska (NPA) 40-13 
Gate Creek Lake, Oreg. (NPP) 37-42, 37-49 
Gathright Dam and Lake Moomaw, Va. (NAO) 5-10, 
5-16, 5-21 
Gauley River, W. Va. (ORH) 25-19 
Gavins Point Dam-Lewis and Clark Lake, Nebr. and 
S. Dak. (MRO) 21-8, 21-12, 21-16, 21-18, 
21-19 
Gaysville Lake, Vt. (NED) 1-45 
Genegantslet Lake, N.Y. (NAB) 4-37 
General Edgar Jadwin Dam and Reservoir, Pa. 
(NAP) 3-13, 3-17 
General Joe Wheeler Dam (ORN) 23-17 
Geneva-On-The-Lake, Ohio (NCB) 32-6, 32-19, 
32-35 
Genoa Sewer Facility, N.C. (SAW) 6-27 
Geographic Systems Laboratory 51-1 
George Street, Keene, N.H. (NED) 1-23 
George, Walter F., Lock and Dam, Ala. and Ga. 
(SAM) 10-24, 10-31, 10-41 
George W. Andrews Lock and Dam, Ala. and Ga. 
(SAM) 10-22, 10-30, 10-41 
Georges River, Maine (NED) 1-38 
Georgetown Harbor, S.C. (SAN) 7-4, 7-9, 7-12 
Gering Valley, Nebr. (MRO) 21-17, 21-20 
Gila River Basin, Ariz. (SPL) 33-4, 33-11, 33-19 
Giles Creek, Elkhorn, Nebr. (MRO) 21-18 
Gill Township Levee, Ind. (ORL) 24-20, 24-29 
Gillham Lake, Ark. (SWL) 18-5, 18-12, 18-23 
Gill's Creek, Lancaster, S.C. (SAN) 7 -17 
Girty's Run, Millvale, Pa. (ORP) 26-4, 26-13 
Glasgow, Mont. (MRO) 21-17, 21-19 
Gleason Creek, Nev. (SPK) 35-31 
Glen Cove Creek, N.Y. (NAN) 2-5, 2-22, 2-27 
Glen Cove Harbor, N.Y. (NAN) 2-37 
Gloucester Harbor and Annisquam River, Mass. 
(NED) 1-38, 1-46, 1-53 
Goat Island, Ga. and S.C. (SAS) 8-17 
Golconda, Ill. (ORL) 24-20, 24-24, 24-29 
Gold Creek, Alaska (NPA) 40-14 
Goldsboro, Neuse River, N.C. (SAW) 6-27 
Goleta, Calif., and Vicinity (SPL) 33-8, 33-20 
Goodfood Creek, Miss. (SAM) 10-14, 10-28, 
10-39 
Gooding Area, Idaho (NPW) 39-14 
Goose Creek, Md. (NAB) 4-34 
Gordons Creek, Hattiesburg, Miss. (SAM) 10-43 
Gordons Landing, Lake Champlain, Vt. (NAN) 2-34 
Goshen Creek, N.J. (NAP) 3-21 
Governor's Run, Md. (NAB) 4-37 
Gowanus Creek Channel, N.Y. (NAN) 2-34 
Grafton, N. Dak. (NCS) 27-24 
Grafton Small Boat Harbor, Ill. (LMS) 14-13 
Grahn, Ky. (ORH) 25-22 
Grand Bayou Pass, La. (LMN) 11-14 
Grand Calumet River Lock, Ind. (NCC) 28-21 
Grand Forks, N. Dak. (NCS) 27-27 
Grand Haven Harbor and Grand River, Mich. (NCE) 
31-7, 31-35, 31-48, 31-63 
Grand Isle and Vicinity, La. (LMN) 11-5, 11-10, 
11-12 
Grand Lake O' the Cherokees, Okla. (SWT) 19-7, 
19-12, 19-14, 19-16, 19-18 
Grand Marais Harbor, Mich. (NCE) 31-61, 31-62 
Grand Marais Harbor, Minn. (NCE) 31-7, 31-35, 
31-48 
Grand Prairie, Tex., Sanitary Landfill (SWF) 16-6, 
16-15, 16-19 
Grand Prairie, Tex., Streambank Erosion at Meyers 
Road (SWF) 16-6, 16-15, 16-19 
Grand Prairie-Bayou Meto, Ark., (MR+T) 42-16, 
42-28, 42-52 
Grand River, Grandville, Mich. (NCE) 31-63 
Grand River, Lansing, Mich. (NCE) 31-63 
Grand Tower Drainage and Levee District, Ill. (LMS) 
14-14 
Grand Traverse Bay Harbor, Mich. (NCE) 31-62 
Grande Ronde Lake, Oreg. (NPW) 39-14 
Grande Ronde Valley, Oreg. (NPW) 39-14, 39-16 
Grandview, Ind. (ORL) 24-22, 24-25 
Grandview Bay Harbor, N.Y. (NCB) 32-39 
Granger, Tex. (SWF) 16-17 
Grant Parish, Below Colfax, La. (LMN) (LMK) 
11-16, 12-18, 12-19 
Grant's Canal Lake Providence, La. (MR+T) 42-56 
Granville, Pa. (ORP) 26-22, 26-28 
Grapevine Lake, Tex. (SWF) 16-7, 16-16, 16-20 
Grasse River (Massena), N.Y. (NCB) 32-35 
I-16

INDEX 
Grassy Creek, Ind. (ORL) 24-20, 24-30 
Graves Creek, Idaho (NPW) 39-14 
Grays Creek Canal, Shelby Co., Tenn. (LMM) 13-6 
Grays Harbor and Chehalis River, Wash. (NPS) 
38-3, 38-12, 38-14, 38-19 
Grays Landing Lock and Dam, Pa. (ORP) 26-25 
Grays Reef Passage, Mich. (NCE) 31-61, 31-62 
Grays River, Wash. (NPP) 37-39 
Grayson Lake, Ky. (ORH) 25-5, 25-13, 25-17 
Great Chazy River, N.Y. (NAN) 2-34 
Great Coharie Creek, N.C. (SAW) 6-31 
Great Egg Harbor Inlet and Peck Beach, N.J. (NAP) 
3-23 
Great Falls, Mont. (MRO) 21-4, 21-10, 21-13 
Great Kills Harbor, N.Y. (NAN) 2-34 
Great Lakes Information Management 31-30 
Great Lakes to Hudson River Waterway, N.Y. (NAN) 
2-34 
Great Miami River, Ind. (ORL) 24-27, 24-30 
Great Pee Dee River, S.C. (SAN) 7-15 
Great Salt Plains Lake, Okla. (SWT) 19-4, 19-10, 
19-14, 19-17 
Great Salt Pond, R.I. (NED) 1-38, 1-53 
Great Sodus Bay Harbor, N.Y. (NCB) 32-6, 32-19, 
32-29, 32-39 
Great South Bay, N.Y. (NAN) 2-34 
Green and Barren Rivers, Ky. (ORL) 24-2, 24-14, 
24-18, 24-23, 24-27 
Green Bay Harbor, Wis. (NCE) 31-7, 31-35, 31-48 
Green Bay Levee and Drainage District No. 2, Iowa 
(NCR) 28-14, 28-17 
Green'Brook, Green Brook, N.J. (NAN) 2-40 
Green Harbor, Mass. (NED) 1-4, 1-25, 1-33, 
1-46, 1-53 
Green Island Levee and Drainage District, Iowa 
(NCR) 28-16 
Green Peter-Foster Lakes, Oreg. (NPP) 37-19, 
37-28, 37-38, 37-47, 37-49 
Green River, Ky. (ORL) 24-30 
Green River, Wash. (NPS) 38-27 
Green River Lake, Ky. (ORL) 24-8, 24-15, 24-27 
Green Valley Creek, Calif. (SPK) 35-31 
Greene, N.Y. (NAB) 4-36, 4-39 
Greenfield Bayou Levee, Ind. (ORL) 24-21, 24-24 
Greenport Harbor, N.Y. (NAN) 2-34 
Greenup, Ky. (ORH) 25-20 
Greenup Locks and Dam, Ky. (ORD) 22-3, 22-6, 
22-8 
Greenvale Creek, Va. (NAO) 5-4, 5-15, 5-18 
Greenville, Tex. (SWF) 16-22 
Greenville Harbor, Miss. (MR+T) 42-29, 42-56 
Greenwich Bay, R.I. (NED) 1-38 
Greenwich Harbor, Conn. (NED) 1-38 
Greenwich Point Beach, Conn. (NED) 1-45 
Greenwood Beach, Evanston, Ill. (NCC) 30-6 
Greers Ferry Lake, Ark. (SWL) 18-9, 18-13, 18-24 
Gregory Drainage District, Mo. (NCR) 28-14, 
28-17 
Greilickville Harbor, Mich. (Formerly Traverse City 
Harbor) (NCE) 31-61, 31-62 
Grenada Lake, Miss. (MR+T) 42-20, 42-59 
Greybull, Wyo. (MRO) 21-17, 21-19 
Griffithsville-Yawkey, W.Va. (ORH) 25-22 
Grifton, N.C. (SAW) 6-31 
Gros Ventre River, Wyo. (NPW) 39-17 
Grove Lake, Kans. (MRK) 20-17 
Guadalupe River, Calif. (SPK) 35- 21 
Guadalupe River (Remove Log Jams), Tex. (SWG) 
15-27 
Guayanes Harbor, P.R. (SAJ) 9-46 
Guilford Creek, Norfolk, Va., District (NAO) 5-25 
Guilford Harbor, Conn. (NED) 1-38 
Guilford Point Beach (Jacobs Beach), Guilford, 
Conn. (NED) 1-42 
Gulf Beach, Milford, Conn. (NED) 1-42 
Gulf Intracoastal Waterway between Apalachee Bay, 
Fla. and Mexican Border (Mobile District) (SAM) 
10-8, 10-27, 10-35 
Gulf Intracoastal Waterway between Apalachee Bay, 
Fla., and Mexican Border (New Orleans Dist.) 
(LMN) 11-14 
Gulf Intracoastal Waterway between Apalachee Bay, 
Fla., and Mexican Border (Galveston, Tex., 
District) (SWG) 15-5, 15-13, 15-19, 15-28, 
15-34, 15-32, 15-34 
Gulf Intracoastal Waterway St. Marks to Tampa Bay, 
Fla. (SAJ) 9-46 
Gulf Street and Trumbull Avenue, Milford, Conn. 
(NED) 1-18, 1-30, 1-36 
Gulfport Harbor, Miss. (SAM) 10-42 
Gull Lake Reservoir, Minn. (NCS) 27-26 
Guntersville Lock and Dam, Ala. (ORN) 23-17 
Guttenberg, Iowa (NCS) 27-24 
Guyandotte River, W. Va. (ORH) 25-19 
Gypsum, Kans. (MRK) 20-17 
H 
H. V. Eastman Lake, Calif. (SPK) 35-4, 35-23 
Hackleman Corners Lake, Mo. (MRK) 20-18 
Haines Harbor, Alaska (NPA) 40-13, 40-15 
Haleiwa Beach, Hawaii (POD) 36-10 
Haleiwa Small Boat Harbor, Hawaii (POD) 36-8 
Hall Meadow Brook Dam, Conn. (NED) 1-22, 
1-43, 1-49 
Hamburg L-575, Iowa (MRO) 21-21 
Hamlin Beach Harbor, N.Y. (NCB) 32-35 
Hamlin Beach State Park, N.Y. (NCB) 32-36 
Hammersley Inlet, Wash. (NPS) 38-25, 38-30 
Hammonassett Beach, Madison, Conn. (NED) 1-42 
I-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Hammond Bay Harbor, Mich. (NCE) 31-8, 31-35, 
31-49 
Hammond Small Boat Basin, Oreg. (NPP) 37-39 
Hammondsport, N.Y. (NCB) 32-39 
Hampton Beach, Hampton, N.H. (NED) 1-42 
Hampton Creek, Va. (NAO) 5-23 
Hampton Harbor, N.H. (NED) 1-5, 1-25, 1-53 
Hampton Institute, Va. (NAO) 5-24 
Hampton Roads and Harbors of Norfolk and 
Newport News, Va.-Collection and Removal of 
Drift (NAO) 5-4, 5-15, 5-18 
Hampton Roads Harbor, Supervision of (NAO) 5-8, 
5-16 
Hana Small Boat Harbor, Hawaii (POD) 36-12 
Hanalei Bay Small Boat Harbor, Hawaii (POD) 
36-12 
Hanapepe Bay, Hawaii (POD) 36-10 
Hanapepe River, Hawaii (POD) 36-11 
Hancock Brook Lake, Conn. (NED) 1-17, 1-29, 
1-49 
Hanging Rock, Ohio (ORH) 25-2 1 
Hannibal, Mo. (NCR) 28-9, 28-13 
Hannibal Harbor, Mo. (NCD) 29-8 
Hannibal Locks and Dam, W. Va. (ORD) 22-1, 
22-7 
Hanover, Minn. (NCS) 27-7, 27-19 
Hanson, Howard A., Dam, Wash. (NAS) 38-8, 
38-16, 38-22 
Harbor Beach Harbor, Mich. (NCE) 31-8, 31-35, 
31-49 
Harbor of Refuge, Block Island, R.I. (NED) 1-38 
Harbor of Refuge, Delaware Bay, Del. (NAP) 3-21 
Harbor of Refuge, N.C. (SAW) 6-28 
Harbor of Refuge and Pt. Judith Pond, R.I. (NED) 
1-7, 1-26, 1-35 
Harden, Cecil M., Lake, Ind. (ORL) 24-7, 24-15, 
24-27 
Harkers Island Harbor, N.C. (SAW) 6-29 
Harlan County Lake, Nebr. (MRK) 20-2, 20-10, 
20-13, 20-19 
Harlem River, N.Y. (NAN) 2-34 
Harpers Ferry, W. Va. (NAB) 4-37 
Harpswell, Maine (NED) 1-22 
Harraseeket River, Maine (NED) 1-38, 1-53 
Harriet Island Harbor, St. Paul, Minn. (NCD) 29-7 
Harris Fork Creek, Tenn. and Ky. (MR+T) 42-28, 
42-58 
Harrisburg, Ill. (ORL) 24-20, 24-24, 24-29 
Harrison County, Miss. (SAM) 10-42 
Harrisonville Levee and Drainage District, Ill. (LMS) 
14-14 
Harrisville Harbor, Mich. (NCE) 31-8, 31-36, 
31-49 
Harrodsburg, Ky. (ORL) 24-30 
Harry S. Truman Dam and Reservoir, Mo. (MRK) 
20-8, 20-12, 20-16, 20-19 
Harsha, William H., Lake, Ohio (ORL) 24-12, 
24-17, 24-27 
Hartford, Conn. (NED) 1-22, 1-43, 1-49 
Hartford, Vt. (NED) 1-43, 1-49 
Hartford, W. Va. (ORH) 25-21 
Hartland, Maine (NED) 1-22 
Hartwell Drainage and Levee District, Ill. (LMS) 
14-3, 14-9, 14-11 
Hartwell Lake, Ga. and S.C. (SAS) 8-8, 8-12, 8-15, 
8-17 
Harvey Canal, Bayou Barataria Levee, La. (LMN) 
11-16 
Hastings Harbor, Minn. (NCD) 29-7 
Hatchie River, Miss. (LMM) 13-1, 13-4 
Haverhill, Mass. (NED) 1-22 
Havre, Mont. (MRO) 21-17, 21-19 
Havre, Scott Coulee-Bull Hook Dam, Mont. (MRO) 
21-19 
Hawarden, Iowa (MRO) 21-21 
Hawesville, Ky. (ORL) 24-20, 24-24, 24-29 
Hay Creek, Birdsboro, Pa. (NAP) 3-23 
Hay (West Harbor), Fisher's Island, N.Y. (NED) 
1-38, 1-53 
Hayden Island, Oreg. (NPP) 37-41, 37-48 
Hays, Kans. (MRK) 20-18 
Haysi, Va. (ORH) 25-20 
Hayward Creek, Mass. (NED) 1-22, 1-43 
Hayward Creek, Quincy-Braintree, Mass. (NED) 
1-22, 1-43 
Heeia-Kea Small Boat Harbor, Hawaii (POD) 36-8 
Heise-Roberts Area, Idaho (NPW) 39-14, 39-19 
Heise-Roberts Extension, Idaho (NPW) 39-14, 
39-16 
Helena Harbor, Ark. (LMN) 13-5 
Hellens Creek, Md. (NAB) 4-37 
Helm Lake, Ill. (ORL) 24-22, 24-28 
Hempstead County Levee District No. 1, Ark. (LMN) 
(LMK) 11-16, 12-18, 12-19 
Hempstead Harbor, N.Y. (NAN) 2-34 
Henderson, W. Va. (ORH) 25-21 
Henderson Bay, Wash. (NPS) 38-27 
Henderson County Drainage Districts Nos. 1, 2 and 
3, Ill. (NCR) 28-14, 28-17 
Henderson River, Ill. (NCR) 28-16 
Hendrick's Harbor, Maine (NED) 1-38 
Hennepin Drainage and Levee District, Ill. (NCR) 
28-14, 28-17 
Henry, Robert F., Lock and Dam, Ala. (SAM) 10-20, 
10-30 
Henry T. Rainey Dam, Ill. (NCD) 29-6 
Hergot Drainage and Levee District (NCR) 28-17 
Herkimer, N.Y. (NAN) 2-36 
Herreid, Spring Creek, S. Dak. (MRO) 21-17, 21-20 
Herring Bay - Rockhold Creek, Md. (NAB) 4-5, 
4-22, 4-29 
Herring Creek, Md. (NAB) 4-5, 4-22, 4-29 
1-18

INDEX 
Heyburn Lake and Polecat Creek, Okla. (SWT) 
19-4, 19-10, 19-14, 19-17 
Hickman Harbor, Ky. (LMM) 13-5 
Hidden Dam-Hensley Lake, Fresno River, Calif. 
(SPK) 35-7, 35-23 
Higginsport, Ohio (ORH) 25-21 
Highland Bayou, Tex. (SWG) 15-27 
Highway 12, Colo. (SWA) 17-7, 17-10 
Highway 39 Bridge, Gainesville, Ala. (SAM) 10-14, 
10-29, 10-39 
Highway 101, Oreg. (NPP) 37-43 
Highway 362 Bridges, Prentiss County, Miss. (SAM) 
10-43 
Hildebrand Lock and Dam, W. Va. (ORP) 26-25 
Hills Creek Lake, Oreg. (NPP) 37-20, 37-28, 
37-38, 37-47, 37-49 
Hillsborough Bay, Fla. (SAJ) 9-53 
Hillsborough River, Fla. (SAJ) 9-38 
Hillsdale Lake, Kans. (MRK) 20-3, 20-10, 20-13, 
20-19 
Hillview Drainage and Levee District, Ill. (LMS) 
14-4, 14-9, 14-11 
Hilo Harbor, Hawaii (POD) 36-8 
Hingham Harbor, Mass. (NED) 1-38 
Hiwassee River, Tenn. (ORN) 23-13 
Hoback River, Wyo. (NPW) 39-17 
Hockingport, Ohio (ORH) 25-21 
Hodges Dam, Calif. (SPL) 33-21 
Hodges Village Dam, Mass. (NED) 1-21, 1-31, 
1-52 
Hoh River, Wash. (NPS) 38-27 
Hoko River, Wash. (NPS) 38-27 
Holbrook Levee, Ariz. (SPL) 33-8, 33-20 
Holland Harbor, Mich. (NCE) 31-9, 31-36, 31-49 
Holley Lake, Oreg. (NPP) 37-42, 37-49 
Holly, Colo. (SWA) 17-7 
Hollywood-Ardmore Beach along Lake Michigan, 
Ill. (NCC) 30-15 
Holmes Bay, Whiting, Maine (NED) 1-43 
Holmes Creek, Fla. (SAM) 10-42 
Holston River, Tenn. (ORN) 23-13 
Holyoke, Mass. (NED) 1-22, 1-43, 1-49 
Homer Harbor, Alaska (NPA) 40-3, 40-8, 40-11 
Hominy Swamp, N.C. (SAW) 6-28 
Homme Lake and Dam, N. Dak. (NCS) 27-7, 27-20 
Homochitto River, Miss. (LMK) 12-14, 12-19 
Homosassa River, Fla. (SAJ) 9-46, 9-47 
Honey Creek Levee, Ind. (ORL) 24-22, 24-25 
Honey Hill Lake, N.H. (NED) 1-45 
Honga River and Tar Bay, Md. (NAB) 4-34 
Honokohau Small Boat Harbor, Hawaii (POD) 36-8 
Honolulu Harbor, Hawaii (POD) 36-8 
Hood Canal, Wash. (NPS) 38-27 ' 
Hoonah Harbor, Alaska (NPA) 40-13, 40-15 
Hooper, Nebr. (MRO) 21-17, 21-20 
Hoosic Falls, Hoosic River Basin, N.Y. (NAN) 2-36 
Hop Brook Lake, Conn. (NED) 1-17, 1-29, 1-49 
Hopkinton-Everett Lakes, N.H. (NED) 1-19, 1-30, 
1-51 
Hoquiam River, Wash. (NPS) 38-25, 38-27 
Hords Creek Lake, Tex. (SWF) 16-7, 16-16, 16-20 
Horn Harbor, Va. (NAO) 5-23 
Hornell, N.Y. (NAB) 4-15, 4-25 
Horseshoe Cove, Fla. (SAJ) 9-46 
Hoskins Creek, Va. (NAO) 5-23 
Hot Springs, S. Dak. (MRO) 21-20 
Houlka Creek, Miss. (SAM) 10-43 
Houma Navigation Canal, La. (LMN) 11-14 
Housatonic River, Conn. (NED) 1-38, 1-45 
Housatonic River, Pittsfield, Mass. (NED) 1-17, 
1-29, 1-35, 1-43 
Housatonic River, Salisbury, Conn. (NED) 1-43 
Housatonic River, Sheffield, Mass. (NED) 1-43 
Housatonic River Basin, Conn. (NED) 1-16, 1-23, 
1-49 
Houston School Road Bridge, Miss. (SAM) 10-14, 
10-29, 10-39 
Houston Ship Channel, Tex. (SWG) 15-6, 15-14, 
15-21, 15-28, 15-30, 15-34 
Howard A. Hanson Dam, Wash. (NAS) 38-8, 38-16, 
38-22 
Howards Mill Lake, N.C. (SAW) 6-27 
Hudson River, Fla. (SAJ) 9-46 
Hudson River, N.Y. (NAN) 2-5, 2-23, 2-28, 2-32, 
2-33, 2-38 
Hudson River Channel, N.Y. (NAN) 2-33, 2-34 
Hugo Lake, Okla. (SWT) 19-4, 19-10, 19-14, 
19-17 
Hulah Lake, Okla. (SWT) 19-4, 19-10, 19-14, 
19-17 
Hull, Cordell, Lock and Dam, Tenn. (ORN) 23-14 
Humboldt, Tenn. (LMM) 13-2, 13-4 
Humboldt Bay, Calif. (SPN) 34-9 
Humboldt Harbor, Alaska (NPA) 40-13 
Humboldt Harbor and Bay, Calif. (SPN) 34-5 
Humboldt River and Tributaries, Nev. (SPK) 35-31 
Hunt Drainage District and Lima Lake Drainage 
District, Ill. (NCR) 28-14, 28-17 
Hunting Island Beach, S.C. (SAN) 7-15 
Huntingdon, Tenn. (LMM) 13-6 
Huntington, Mass. (NED) 1-22, 1-43, 1-49 
Huntington, W. Va. (ORH) 25-20, 25-22 
Huntington Avenue, Castle Rock, Wash. (NPP) 37-41 
Huntington Harbor, N.Y. (NAN) 2-38 
Huntington Lake, Ind. (ORL) 24-8, 24-15 
Huot, Minn. (NCS) 27-27 
Huron Harbor, Ohio (NCB) 32-6, 32-19, 32-30 
Hurricane Barrier Operations, New England Division 
(NED) 1-23 
Hutchins, Ky. (ORH) 25-22 
Hutchinson Levee and Channel, Kans. (SWT) 19-15, 
19-17, 19-18 
1-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Hyannis Harbor, Mass. (NED) 1-5, 1-25, 1-34 
Hyde County Dike, N.C. (SAW) 6-28 
Hydraulics and Hydrology of the Great Lakes 31-31 
Hydrologic Engineering Center (HEC) 53-2 
I 
lao Stream, Hawaii (POD) 36-11 
Ice Harbor at Marcus Hook, Pa. (NAP) 3-21 
Ice Harbor at New Castle, Del. (NAP) 3-21 
Ice Harbor Lock and Dam-Lake Sacajawea, Wash. 
(NPW) 39-4, 39-9, 39-12, 39-18, 39-22 
Ida Grove, Iowa (MRO) 21- 17, 21-21 
Iliuliuk Harbor, Alaska (NPA) 40-13, 40-15 
Illinois and Mississippi Canal, Ill. (NCR) 28-2, 
28-8 
Illinois River, Ill. (MR+T) 42-19 
Illinois Waterway, Ill. and Ind. (NCR) 28-2, 28-8, 
28-10, 28-16, 28-20, 28-21, 28-22 
Imperial Beach, Calif. (SPL) 33-3, 33-10, 33-15 
Indian Bend Wash, Ariz. (SPL) 33-19 
Indian Creek Area, Ill. (LMS) 14-14 
Indian Creek, Corydon, Ind. (ORL) 24-20, 24-30 
Indian Creek Lake, Emerson, Iowa (MRO) 21-4, 
21-10, 21-13, 21-18 
Indian Grave Drainage District, Ill. (NCR) 28-14, 
28-17 
Indian Island, Maine (NED) 1-22 
Indian Lake, Kans. (MRK) 20-17 
Indian River Inlet and Bay, Del. (NAP) 3-4, 3-15, 
3-19 
Indiana Dunes National Lakeshore Emergency Stone 
Repairs, Beverly Shores, Ind. (NCC) 30-6, 30-9, 
30-13 
Indiana Harbor, Ind. (NCC) 30-4, 30-9, 30-12, 
30-14, 30-15 
Indianapolis, Ind. (ORL) 24-21, 24-29 
Indianapolis, Ind. (Fall Creek Section) (ORL) 24-20 
Indianola, Nebr. (MRK) 20-17, 20-19 
Industry, Pa. (ORP) 26-23 
Inez, Ky. (ORH) 25-22 
Inland Route, Mich. (NCE) 31-9, 31-36, 31-49 
Inland Waterway from Chincoteague Bay, Va., to 
Delaware Bay, Del. (NAP) 3-21 
Inland Waterway from Delaware River to 
Chesapeake Bay, Del. and Md. (NAP) 3-6, 3-16, 
3-19 
Inland Waterway from Franklin to Mermentau River, 
La. (LMN) 11-14 
Inland Waterway, Rehoboth Bay to Delaware Bay, 
Del. (NAP) 3-5, 3-15, 3-19 
Institute for Water Resources 53-3 
Intercounty D. D., Little Sioux River, Iowa (MRO) 
21-21 
International Boundary Waters Boards, 49-1 
International Champlain-Richelieu Board 49-2 
International Great Lakes Diversions and 
Consumptive Uses Study Board 31-30, 49-2 
International Great Lakes Technical Information 
Network Board 31-30, 49-2 
International Joint Commission Board of Control 
(IJC) 49-1 
International Kootenay Lake Board of Control 49-1 
International Lake Champlain Board of Control 
49-1 
International Lake Memphremagog Board 49-2 
International Lake of the Woods Control Board 
49-1 
International Lake Superior Board of Control 
31-29, 49-1 
International Niagara Board of Control 31-30, 
49-1 
International Niagara Committee 49-2 
International Niagara Working Committee 31-30 
International Osoyoos Lake Board of Control 49-1 
International Rainy Lake Board of Control 49-1 
International Skagit River Board of Control 49-1 
International Souris River Board of Control 49-1 
International Souris-Red Rivers Engineering Board 
49-2 
International St. Croix River Board of Control 49-1 
International St. Lawrence River Board of Control 
31-30, 49-1 
Interstate Bridge, Portland, Oreg. (NPP) 37-39 
Interstate Highway Bridge (Barge Channel), Oreg. 
(NPP) 37-39 
Interstate 20 Bridges, Jackson, Miss. (SAM) 10-43 
Interstate 59 Bridges, Fosters, Ala. (SAM) 10-17, 
10-29, 10-40 
Intracoastal Waterway, Caloosahatchee River to 
Anclote River, Fla. (SAJ) 9-6, 9-26, 9-33 
Intracoastal Waterway, Jacksonville to Miami, Fla. 
(SAJ) 9-7, 9-26, 9-33, 9-46 
Intracoastal Waterway, Miami to Key West, Fla. 
(SAJ) 9-46, 9-47 
Intracoastal Waterway, Mississippi River to Bayou 
Teche, La. (LMN) 11-14 
Investigations of Projects Under the Federal Power 
Act 47-1 
Iola Levee, Kans. (SWT) 19-15, 19-17, 19-18 
Iowa River-Flint Creek Levee District No. 16, Iowa 
(NCR) 28-14, 28-17 
Ipswich Harbor, Mass. (NED) 1-39 
Irondequoit Bay, N.Y. (NCB) 32-7, 32-19 
Ironton, Ohio (ORH) 25-20, 25-22 
Irving Floodway, Tex. (SWF) 16-22 
Irving Township, Jackson Co., Wis. (NCS) 27-7, 
27-20, 27-24, 27-27 
Irvington Harbor, N.Y. (NAN) 2-38 
Isabella Lake, Kern River, Calif. (SPK) 35-8, 35-24 
Island Avenue, Quincy, Mass. (NED) 1-22, 1-43 
I-20

INDEX 
Island Creek, Md. (NAB) 4-34, 4-38 
Island Creek, St. Georges Island, Md. (NAB) 4-6, 
4-22, 4-29 
Island End River, Chelsea, Mass. (NED) 1-39 
Island Levee, Ind. (ORL) 24-21, 24-24 
Isle Au Haut Thoroughfare, Maine (NED) 1-39, 
1-53 
Isle of Shoals Harbor, Maine and N.H. (NED) 1-39 
Islesboro (The Narrows), Maine (NED) 1-18, 1-22, 
1-29, 1-36, 1-43 
Ithaca, N.Y., Cascadilla Creek (NCB) 32-39 
Ithaca, N.Y., Cayuga Inlet (NCB) 32-37 
Ithaca, N.Y., Fall Creek (NCB) 32-39 
J 
J. Percy Priest Dam and Reservoir, Ohio River 
Basin, Tenn. (ORN) 23-7, 23-9, 23-18 
Jackson, Ky. (ORL) 24-20, 24-24, 24-30 
Jackson and East Jackson, Miss. (SAM) 10-43 
Jackson Creek, Va. (NAO) 5-23 
Jackson Hole, Wyo. (NPW) 39-14 
Jacksonburg, Fishing Creek, W.Va. (ORH) 25-22 
Jacksonville Harbor, Fla. (SAJ) 9-7, 9-26, 9-34 
Jadwin, General Edgar, Dam and Reservoir, Pa. 
(NAP) 3-13, 3-17 
Jamaica Bay, N.Y. (NAN) 2-33, 2-34 
James River, Va. (NAO) 5-5, 5-15, 5-19, 5-25 
Jamestown Reservoir, N. Dak. (MRO) 21-17 
Janesville and Indian Ford Dams, Wis. (NCR) 28-16 
Jarvis Creek, Va. (NAO) 5-23 
Jefferson River, Bank Protection, near Waterloo, 
Mont. (MRO) 21-19 
Jefferson River, Willow Creek Bridge, near Three 
Forks, Mont. (MRO) 21-19 
Jeffersonville-Clarksville, Ind. (ORL) 24-20, 
24-24, 24-29 
Jemez Canyon Dam, N. Mex. (SWA) 17-4, 17-8, 
17-10 
Jenkins, Tom, Dam, Ohio (ORH) 25-15, 25-18 
Jenkins, Tom, Reservoir, Ohio (ORH) 25-10 
Jenks Levee, Okla. (SWT) 19-15, 19-17, 19-18 
Jennings Beach, Fairfield, Conn. (NED) 1-42 
Jeremy Creek, S.C. (SAN) 7-15 
Jim Woodruff Lock and Dam, Ga. and Fla. (SAM) 
10-23, 10-30, 10-41 
Joe Creek Channel Improvement, Okla. (SWT) 
19-17, 19-18 
Joe Pool Lake (Lakeville Lake), Tex. (SWF) 16-7, 
16-16, 16-20 
John Day Lock and Dam-Lake Umatilla, Oreg. and 
Wash. (NPP) 37-20, 37-28, 37-38, 37-51 
John Day River, Oreg. (NPP) 37-14, 37-27, 37-36, 
37-40, 37-44 
John Drainage District, Oreg. (NPP) 37-44, 37-48 
John H. Kerr Dam and Reservoir, Va. and N.C. 
(SAW) 6-14, 6-16, 6-20 
John Martin Reservoir, Colo. (SWA) 17-2, 17-8 
John Redmond Dam and Reservoir, Kans. (SWT) 
19-5, 19-10, 19-14, 19-17 
John W. Flannagan Dam and Reservoir, Va. (ORH) 
25-6, 25-13, 25-17 
Johns Pass, Fla. (SAJ) 9-8, 9-26, 9-34 
Johnson Bay, Lubec, Maine (NED) 1-43 
Johnson Bayou, La. (SWG) 15-27 
Johnson Creek, Vicinity of Portland, Oreg. (NPP) 
37-42, 37-49 
Johnsonburg, Pa. (ORP) 26-22, 26-26, 26-28 
Johnstown, Pa. (ORP) 26-4, 26-13, 26--18, 26-26 
Jones Inlet, N.Y. (NAN) 2-6, 2-23, 2-28, 2-33 
Jonesport Harbor, Maine (NED) 1-5, 1-26, 1-34 
Jonesville, La. (LMK) 12-13 
Jordan, B. Everett, Dam and Lake, N.C. (SAW) 
6-10, 6-15, 6-20 
Jordan Creek, Henry County, Va. (SAW) 6.. 31 
Josias River, Maine (NED) 1-39 
Joyce Creek, Camden County, N.C. (SAW) 6-27 
Julian, Nebr. (MRO) 21-20 
Juneau Harbor, Alaska (NPA) 40-13, 40-15 
K 
Kaaawa Beach, Hawaii (POD) 36-10 
Kahoma Stream, Hawaii (POD) 36-4, 36 6, 36-- 7 
Kahului Beach Road, Hawaii (POD)) 36-- 8 
Kahului Harbor, Hawaii (POD) 36-8 
Kailua Small Boat Harbor, Hawaii (POD) 36 - 8 
Kaimu Black Sand Beach, Hawaii (POD) 36-- 12 
Kake Harbor, Alaska (NPA) 40-3, 40-8, 40-i1l 
Kalama River (South Area) Levee, Wash. (NPP) 
37-44, 37-48 
Kalama Turning Basin, Wash. (NPP) 37--7, 37-25, 
37-35 
Kalamazoo River (Battle Creek), Mich. (NC(E) 
31-63 
Kalamazoo River (Kalamazoo), Mich. (N( E) 31-- 63 
Kalaupapa Harbor, Hawaii (POD) 36--8 
Kanawha River, W. Va. (ORH) 25-2, 25 --12, 25-- 16 
Kaneohe-Kailua Area, Hawaii (POD) 36- 11 
Kankakee River, Ill. and Ind. (NCC) 30--15 
Kanopolis Lake, Kans. (MRK) 20-3, 20-10, 20-13, 
20-19 
Kansas City, Kans. (1962 Mod.) (MRK) 20--17 
Kansas Citys on Mo. and Kansas Rivers, Mo. and 
Kans. (MRK) 20-17 
Kansas River and Minor Tributaries (MRK) 20-19 
Kansas River Navigation, Kans. (MRK) 20-16 
Kapaa Town, Hawaii (POD) 36-10 
Kapaakea Homestead Flood Control, Hawaii (POD) 
36-12 
1-21

REPORT OF THIE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Karlson Island, Oreg. (NPP) 37-40 
Kasilof Harbor, Alaska (NPA) 40-13 
Kaskaskia Island Drainage and Levee District, Ill. 
(LMS) 14-4, 14-9, 14-11, 14-14 
Kaskaskia River, Ill. (LMS) 14-2, 14-9, 14-11 
Kaukauna Dam, Wis. (NCE) 31-60 
Kaukauna Fifth Lock, Wis. (NCE) 31-60 
Kaukauna First Lock, Wis. (NCE) 31-60 
Kaukauna Fourth Lock, Wis. (NCE) 31-60 
Kaukauna Guard Lock, Wis. (NCE) 31-60 
Kaukauna Second Lock, Wis. (NCE) 31-60 
Kaukauna Third Lock, Wis. (NCE) 31-60 
Kaulana Bay Boat Harbor, Hawaii (POD) 36-2, 
36-6 
Kaunakakai Harbor, Hawaii (POD) 36-8 
Kaunakakai Stream, Hawaii (POD) 36-11l 
Kaw Lake, Okla. (SWT) 19-5, 19-11, 19-14, 19-17 
Kawaihae Harbor, Hawaii (POD) 36-8 
Kawainui Swamp, Hawaii (POD) 36-11 
Kaweah and Tule Rivers, including Terminus Dam 
and Success Lake, Calif. (SPK) 35-9, 35-24 
Kawkawlin River, Mich. (NCE) 31-26, 31-44,31-56 
Kays Creek, Utah (SPK) 35-31 
Keach Drainage and Levee District, Ill. (LMS) 
14-14 
Keehi Lagoon, Hawaii (POD) 36-8 
Keene, N.H. (NED) 1-22, 1-43, 1-49 
Kehoe Lake, Ky. (ORH) 25-20 
Keithsburg Drainage District, Ill. (NCR) 28-16 
Kekaha Beach, Hawaii (POD) 36-10 
Kelleys Island, Ohio (NCB) 32-35 
Kendrick, Idaho (NPW) 39-14, 39-16 
Kenmore Navigation Channel, Wash. (NPS) 38-4, 
38-15, 38-20, 38-31 
Kennebec River, Maine (NED) 1-6, 1-26, 1-34 
Kennebunk River, Maine (NED) 1-6, 1-25, 1-33, 
1-39 
Kenosha Harbor, Wis. (NCE) 31-10, 31-36, 31-49 
Kentucky Lock and Dam, Ky. (ORN) 23-17 
Kentucky River, Ky. (ORL) 24-2, 24-14, 24-23, 
24-27 
Keokuk Harbor, Iowa (NCD) 29-8 
Kern River-California Aqueduct Intertie, Calif. 
(SPK) 35-31 
Kerr, John H., Dam and Reservoir, Va. and N.C. 
(SAW) 6-14, 6-16, 6-20 
Kerr, Robert S., Lock and Dam, Okla. (SWL) (SWT) 
18-20, 19-8, 19-13, 19-15, 19-16 
Kerr, Robert S., Marine Terminal, Sallisaw, Okla. 
(SWT) 19-16 
Kerton Valley Drainage and Levee District, Ill. 
(NCC) 28-17 
Ketchikan Harbor, Alaska (NPA) 40-13, 40-14 
Kewalo Harbor, Hawaii (POD) 36-12 
Kewaunee Harbor, Wis. (NCE) 31-10, 31-36, 
31-50 
Kewaunee River, Wis. (NCE) 31-63 
Keweenaw Waterway, Mich. (NCE) 31-109 31-37, 
31-50 
Key West, Fla. (SAJ) 9-45, 9-47 
Key West Harbor, Fla. (SAJ) 9-46 
Keyport Harbor, N.J. (NAN) 2-34 
Keystone Lake, Okla. (SWL) (SWT) 18-22, 19-7, 
19-12, 19-15, 19-16, 19-17 
Kickapoo River, Gay Mills, Wis. (NCS) 27-7, 27-20 
Kihei Beach, Hawaii (POD) 36-10 
Kikiaola Small Boat Harbor, Hawaii (POD) 36-8 
Kill Van Kull-Newark Bay Channel, N.J. and N.Y. 
(NAN) 2-7, 2-23, 2-28 
King Cove Harbor, Alaska (NPA) 40-3, 40-8, 
40-11 
Kings Creek, Va. (NAO) 5-23 
Kingston Harbor, Wash. (NPS) 38-25 
Kingston Harbor (North Plymouth), Mass. (NED) 
1-39 
Kingston-Edwardsville, Pa. (NAB) 4-36, 4-39 
Kingstree Branch, S.C. (SAN) 7-8, 7-16 
Kinzua Dam and Allegheny Reservoir, Pa. and N.Y. 
(ORP) 26-7, 26-14, 26-18, 26-27 
Kirwan, Michael J., Dam and Reservoir, Ohio (ORP) 
26-8, 26-14, 26-19, 26-27 
Kishwaukee River at De Kalb, Ill. (NCR) 28-14 
Kissimmee River, Fla. (SAJ) 9-45, 9-46 
Kittanning, Pa. (ORP) 26-28 
Kittanning, Pa. Part I (ORP) 26-22, 26-26 
Kittanning, Pa. Part II (ORP) 26-23 
Kitzmiller, Md. (NAB) 4-36, 4-39 
Klamath River, Calif. (SPK) (SPN) 35-31 
Klutina River, Copper Center, Alaska (NPA) 40-14 
Knappa Area, Oreg. (NPP) 37-40 
Knapps Narrows, Md. (NAB) 4-34 
Knife River Harbor, Minn. (NCE) 31-11, 31-37, 
31-50 
Knights Valley Lake, Calif. (SPN) 34-9 
Knightville Dam, Mass. (NED) 1-13, 1-28, 1-48 
Knobb's Creek, N.C. (SAW) 6-25 
Kodiak Harbor, Alaska (NPA) 40-13, 40-15 
Konkapot River, North Canaan, Conn. (NED) 1-23 
Kootenai River, Idaho and Mont. (NPS) 38-25, 
38-27 
Kualoa Regional Park, Hawaii (POD) 36-10 
Kuliouou Stream, Hawaii (POD) 36-11 
Kuskokwim River, Bethel, Alaska (NPA) 40-6, 
40-9, 40-12 
L 
L'Anguille Basin, Ark. (MR+T) 42-28 
L'Anguille River, Ark. (MR+T) 42-18 
La Conner, Wash. (NPS) 38-27 
La Crosse, Wig. (NCS) 27-24 
1-22

INDEX 
La Farge Lake and Channel Improvement, Wis. 
(NCS) 27-8, 27-20 
La Grange Bayou, Fla. (SAM) 10-42, 10-45 
La Grange Lock and Dam, Ill. (NCC) 28-20 
La Pointe Harbor, Wis. (NCE) 31-11, 31-37, 
31-50 
La Trappe, Md. (NAB) 4-34 
Lac La Belle Harbor, Mich. (NCE) 31-61, 31-62 
Lac Qui Parle Lake, Minnesota River, Minn. (NCS) 
27-8, 27-20 
Lacey Drainage and Levee District, Ill. (NCC) 28-17 
Lacey, Langellier, West Mantanzas and Kerton Valley 
Drainage and Levee District, Ill. (NCR) 28-14 
Lackawanna, N.Y. (NCB) 32-37 
Lackawanna River Basin, Pa. (NAB) 4-12, 4-32 
Lafayette Lake, Ind. (ORL) 24-21 
Lafayette River, Va. (NAO) 5-23 
Lago De Cerrillos, P.R. (SAJ) 9-41 
Lago De Portugues, P.R. (SAJ) 9-41 
Lagoon Pond, Martha's Vineyard, Mass. (NED) 1-39 
Lahaina Small Boat Harbor, Hawaii (POD) 36-8 
Lake Ashtabula and Baldhill Dam, Sheyenne River, 
N. Dak. (NCS) 27-9, 27-20 
Lake Borgne and Chef Menteur-Bulkheads and 
Jetties (LMN) 11-14 
Lake Brownwood Modification, Tex. (SWF) 16-22 
Lake Bryan, Wash. (NPW) 39-5, 39-12 
Lake Camanche, Calif. (SPK) 35-31 
Lake Celilo, Wash. and Oreg. (NPP) 37-22, 37-29, 
37-38, 37-52 
Lake City, Tenn. (ORN) 23-19 
Lake Champlain, Plattsburgh, N.Y. (NAN) 2-39 
Lake Charles Deep Water Channel, La. (LMN) 
11-14 
Lake Chautauqua and Chadakoin River, N.Y. (ORP) 
26-23 
Lake City Harbor, Minn. (NCD) 29-7 
Lake Crescent and Dunns Creek, Fla. (SAJ) 9-46 
Lake Crockett, Wash. (NPS) 38-25, 38-31 
Lake Darling, N. Dak. (NCS) 27-9, 27-20 
Lake Douglas, Ga. (SAM) 10-43 
Lake Erie-Ohio Canal, Ohio and Pa. (ORP) 26-23 
Lake Fork Lake, Sabine River, Tex. (SWF) 16-22 
Lake Francis Case, S. Dak. (MRO) 21-8, 21-12, 
21-16 
Lake Georgetown, Tex. (SWF) 16-17 
Lake Greeson, Ark. (LMK) 12-16, 12-19 
Lake Harbor, Fla. (SAJ) 9-47 
Lake Hudson, Okla. (SWT) 19-16, 19-18 
Lake Kemp, Tex. (SWT) 19-5, 19-11, 19-14, 
19-17 
Lake Meredith, Okla. (SWT) 19-18 
Lake Michigan, Edgewater/Rogers Park 
Communities, Chicago, Ill. (NCC) 30-7, 30-10, 
30-13 
Lake Michigan-Lake Bluff, Ill. (NCC) 30-15 
Lake Michigan-Lake Forest, Ill. (NCC) 30-15 
Lake Montauk Harbor, N.Y. (NAN) 2-33, 2-34 
Lake Neatahwanta, Fulton, N.Y. (NCB) 32-11 
Lake Ocklawaha, Fla. (SAJ) 9-5 
Lake Ogleton, Md. (NAB) 4-37 
Lake Oroville, Calif. (SPK) 35-31 
Lake Pontchartrain, La. (MR+T) 42-15, 42-56 
Lake Pontchartrain, La. Project Levees (MR+T) 
42-45, 42-49 
Lake Pontchartrain and Vicinity, La., (Hurricane 
Protection) (LMN) 11-6, 11-10, 11-12 
Lake Providence Harbor, La. (LMK) 12-14 
Lake Pulaski, Minn. (NCS) 27-9, 27-20 
Lake River, Wash. (NPP) 37-39 
Lake River Delta Area, Wash. (NPP) 37-44, 37-48 
Lake Rousseau, Fla. (SAJ) 9-5 
Lake Sacajawea, Wash. (NPW) 39-4, 39-12 
Lake Sakakawea, N. Dak. (MRO) 21-8, 21-12 
Lake Sharpe, S. Dak (MRO) 21-7, 21-12 
Lake Shelbyville, Ill. (LMS) 14-14 
Lake Sidney Lanier, Ga. (SAM) 10-30, 10-41 
Lake St. Clair, Mich., Channels (NCE) 31-11, 
31-37, 31-50 
Lake Texoma, Tex. and Okla. (SWT) ,9-7, 19-13, 
19-15, 19-17 
Lake Traverse, Minn. and S. Dak. (NCS) 27-23 
Lake Traverse and Bois De Sioux River, S. Dak. and 
Minn. (NCS) 27-10, 27-20 
Lake Umatilla, Oreg. and Wash. (NPP) 37-20, 
37-28, 37-38, 37-51 
Lake Wallula, Wash. (NPW) 39-7, 39-10, 39-12 
Lake Washington Ship Canal, Wash. (NPS) 38-4, 
38-15, 38-20, 38-31 
Lakeport Lake, Calif. (SPK) 35-31 
Lakeshore Park, Ashtabula, Ohio (NCB) 32-14, 
32-22 
Lakeview Park, Lorain, Ohio (NCB) 32-12, 32-21 
Lamoille River, Vt. (NAN) 2-36, 2-38 
Lamprey River, N.H. (NED) 1-39 
Lancaster, Mass. (NED) 1-22 
Lancaster, N.Y. (NCB) 32-37 
Lancaster, Israel River, N.H. (NED) 1-43 
Langdon Park, Wilmette, Ill. (NCC) 30-6 
Langellier Drainage and Levee District, Ill. (NCC) 
28-17 
Lansing (Grand River), Mich. (NCE) 31-63 
Lansing Harbor, Iowa (NCD) 29-7 
LaPlatte River, Shelburne Bay, Vt. (NAN) 2-38 
Lapwai Creek, Culdesac, Idaho (NPW) 39-14 
Larchmont Harbor, N.Y. (NAN) 2-34 
Largo Sound Channel, Fla. (SAJ) 9-45, 9-46 
Lared, Kans. (SWT) 19-17 
Larose to Golden Meadow, La. (Hurricane 
Protection) (LMN) 11- 7, 11 - 10, 11-13 
Larson Bay Small Boat Harbor, Alaska (NPA) 40-15 
I-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Las Animas, Colo. (SWA) 17-7, 17-10 
Las Cruces, N. Mex. (SWA) 17-7, 17-10 
Las Tunas Beach, Calif. (SPL) 33-19 
Las Vegas Wash Tributaries, Nev. (SPL) 33-21 
Latrobe, Pa. (ORP) 26-22, 26-26, 26-28 
Latta Brook Road, N.Y. (NAB) 4-36 
Laurel River Lake, Ohio River Basin, Ky. (ORN) 
23-7, 23-9, 23-18 
Lava Hot Springs, Idaho (NPW) 39-14 
Lavaca-Navidad River, Tex. (SWG) 15-27 
Lavon Lake, Tex. (SWF) 16-8, 16-16, 16-20 
Lavon Lake Modification and East Fork Channel 
Improvement, Tex. (SWF) 16-8, 16-16, 16-20 
Lawrence, Kans. (MRK) 20-17, 20+-19 
Lawrenceburg, Ind. (ORL) 24-20, 24-24," 24-29 
Lawyers Creek, Kamiah, Idaho (NPW) 39-17 
Lead Bayou, Miss. (LMK) 12-5, 12-9, 12-11 
Leading Creek, W. Va. (ORH) 25-20 
Leaf and Bowie Rivers, Hattiesburg, Miss. (SAM) 
10-14, 10-29, 10-39 
Leaf and Chickasawhay River, Miss. (SAM) 10-42 
Leavenworth, Ind. (ORL) 24-22, 24-25 
Lebanon Junction, Ky. (ORL) 24-20, 24-29 
Le Claire Lock (Canal), Iowa (NCD) 29-5 
Lee County, Fla. (SAJ) 9-47 
Lee, Housatonic River, Mass. (NED) 1-22, 1-43 
Leech Lake Reservoir, Minn. (NCS) 27-26 
Leesville, Va., Roanoke River, Sec. 32, Demo. Project 
(SAW) 6-12, 6-20 
Leetonia, Ohio (ORP) 26-22 
Leetsdale, Pa. (ORP) 26-22, 26-26 
Lehigh River at Allentown, Pa. (NAP) 3-13 
Lehigh River at Bethlehem, Pa. (NAP) 3-13, 
3-24 
Leipsic River, Del. (NAP) 3-21 
Leith's Creek, N.C. (SAW) 6-27 
Leith's Creek, S.C. (SAN) 7-16 
Leland Bowman Lock, La. (formerly Vermilion Lock) 
(LMN) 11-2, 11-10, 11-12 
Leland Harbor, Mich. (NCE) 31-12, 31-37, 31-50 
Lemon Creek, N.Y. (NAN) 2-34 
Les Cheneaux Islands, Channels, Mich. (NCE) 
31-61, 31-62 
Letart, W. Va. (ORH) 25-21 
Letart Falls, Ohio (ORH) 25-21 
Levee Districts between Carlyle and New Athens, Ill. 
(LMS) 14-14 
Levee Districts between Cowden and Vandalia, Ill. 
(LMS) 14-14 
Levee Unit No. 1, Ill. (ORL) 24-21 
Levee Unit No. 5, Ind. (ORL) 24-4, 24-14, 24-29 
Levee Unit No. 8, Ind. (ORL) 24-20, 24-29 
Levees (LMK) (LMS) (MR+T) (ORL) 14-14, 24-22, 
24-25, 42-4, 42-10, 42-28, 42-44, 42-46, 
42-47, 42-54, 42-55, 42-57 
Levels of the Great Lakes 31-31 
Levisa and Tug Forks of the Big Sandy River and 
Cumberland River, W. Va., Va., and Ky. (ORH) 
25-6, 25-13, 25-17, 25-19 
Lewis and Clark Lake, Nebr. and S. Dak. (MRO) 
21-8, 21-12, 21-16 
Lewis and Clark River Area, Oreg. (NPP) 37-40 
Lewis River, Wash. (NPP) 37-39 
Lewis River Area, Wash. (NPP) 37-44, 37-48 
Lewisport, Ky. (ORL) 24-21, 24-24 
Lewiston-Clarkston Bridge, Idaho and Wash. 
(NPW) 39-5, 39-9, 39-12 
Lewisville Dam, Tex. (SWF) 16-8, 16-16, 16-20 
Lexington Harbor, Mich. (NCE) 31-12, 31-37, 
31-51 
Libby Dam-Lake Koocanusa, Mont. (NAS) 38-11, 
38-17, 38-23 
Liberty Local Protection Project, Tex. (SWG) 15-27 
Liberty State Park Levee and Seawall, N.J. (NAN) 
2-18, 2-25, 2-31 
Lick Run, Roanoke, Va. (SAW) 6-27 
Licking River, Ky. (ORL) 24-19, 24-27, 24-30 
Lido Key, Fla. (SAJ) 9-47 
Lighthouse Point Park, Conn. (NED) 1-42 
Lincoln, N.H. (NED) 1-22 
Lincoln, Nebr. (MRO) 21-20 
Lincoln Lake, Ind. (ORL) 24-22 
Lincoln School Lake, Me. (NED) 1-43 
Linton, N. Dak. (MRO) 21-17 
Lisle, N.Y. (NAB) 4-16, 4-26 
Little Bay, Tex. (SWG) 15-27 
Little Bay De Noc, Gladstone Harbor, Mich. (NCE) 
31-62 
Little Blue River Channel Improvement, Mo. (MRK) 
20-3, 20-11, 20-14 
Little Blue River Lakes, Mo. (MRK) 20-3, 20-11, 
20-14 
Little Caillou Bayou, La. (LMN) 11-14 
Little Calumet River, Ill. (NCC) 30-15 
Little Chute Combined Lock, Wis. (NCE) 31-60 
Little Chute Dam, Wis. (NCE) 31-60 
Little Chute First (Guard) Lock, Wis. (NCE) 31-60 
Little Chute Second Lock, Wis. (NCE) 31-60 
Little Cove Creek, Glencoe, Ala. (SAM) 10-43 
Little Creek, Kent Island, Md. (NAB) 4-34 
Little Dell Lake, Utah (SPK) 35-10, 35-24 
Little Egg Harbor, N.J. (NAP) 3-21 
Little Goose Lock and Dam-Lake Bryan, Wash. 
(NPW) 39-5, 39-9, 39-12, 39-19, 39-22 
Little Harbor, N.H. (NED) 1-39 
Little Harbor, Woods Hole, Mass. (NED) 1-39 
Little Kanawha River, W. Va. (ORH) 25-19 
Little Kaukauna Lock and Dam, Wis. (NCE) 31-60 
Little Lake Harbor, Mich. (NCE) 31-12, 31-38, 
31-51 
Little Machipongo River, Va. (NAO) 5-5, 5-15, 
5-19 
1-24

INDEX 
Little Manatee River, Fla. (SAJ) 9-46 
Little Massard Creek, Fort Smith, Ark. (SWL) 18-6, 
18-12 
Little Miami River, Ohio (ORL) 24-27, 24-30 
Little Missouri River, Ark. (LMK) 12-14, 12-16 
Little Neck Bay, N.Y. (NAN) 2-34 
Little Nemaha River, Nebr. (MRO) 21-17 
Little Papillion, Nebr. (MRO) 21-17, 21-20 
Little Pee Dee and Pee Dee Rivers, N.C. and S.C. 
(SAN) 7-17 
Little Red River and Tributaries, Clinton, Ark. (SWL) 
18-6, 18-12 
Little Red River, White County Road Bridge, 
Judsonia, Ark. (SWL) 18-17 
Little River, Del. (NAP) 3-21 
Little River, La. (LMK) 12-14 
Little River at Cayuga Island, N.Y. (NCB) 32-35 
Little River Basin (Little Rock District), Ark. (SWL) 
18-6, 18-12, 18-23 
Little River (Creek), Va. (NAO) 5-23 
Little River Dike, Westfield, Mass. (NED) 1-43 
Little River Diversion Channel, Mo. (MR+T) 42-19 
Little River Inlet, N.C. and S.C. (SAN) 7-5, 7-9, 
7-13 
Little River Project Levees (MR+T) 42-48, 42-49 
Little Rock Levee, Ark. (East End Fourche Bayou) 
(SWL) 18-17 
Little Rock Slackwater Harbor, Arkansas River, Ark. 
(SWL) 18-3, 18-11 
Little Rockfish Creek, Hope Mills, N.C. (SAW) 6-27 
Little Sioux River and Tributaries, Iowa (MRO) 
21-4, 21-11, 21-13 
Little Sodus Bay Harbor, N.Y. (NCB) 32-7, 32-20, 
32-30 
Little Sugar Creek, Charlotte, N.C. (SAW) 6-27 
Little Tallahatchie River, Miss. (LMK) 12-14 
Little Tennessee River, Tenn. (ORN) 23-13 
Little Valley Wash, Magna, Utah (SPK) 35-33 
Little Wicomico River, Va. (NAB) 4-6, 4-22, 
4-29 
Little Wood River, Idaho (NPW) 39-16 
Littleville Lake, Mass. (NED) 1-13, 1-28, 1-48 
Liverpool Drainage and Levee District, Ill. (NCR) 
28-14, 28-17 
Lloyd Park, Winnetka, Ill. (NCC) 30-6 
Lock and Dam No. 1, Minn. (NCD) 29-5, 29-9 
Lock and Dam No. 2, Allegheny River, Pa. (ORP) 
26-24 
Lock and Dam No. 2, Ark. (SWL) 18-3, 18-19 
Lock and Dam No. 2, Minn. (NCD) 29-5 
Lock and Dam No. 2, Monongahela River, Pa. (ORP) 
26-25 
Lock and Dam No. 3, Allegheny River, Pa. (ORP) 
26-24 
Lock and Dam No. 3, Ark. (SWL) 18-3, 18-18 
Lock and Dam No. 3, Minn. (NCD) 29-5 
Lock and Dam No. 3, Monongahela River, Pa. (ORP) 
26-25 
Lock and Dam No. 4, Allegheny River, Pa. (ORP) 
26-24 
Lock and Dam No. 4, Ark. (SWL) 18-3, 18-18 
Lock and Dam No. 4, Monongahela River, Pa. (ORP) 
26-25 
Lock and Dam No. 4, Wis. (NCD) 29-5 
Lock and Dam No. 5, Allegheny River, Pa. (ORP) 
26-24 
Lock and Dam No. 5, Ark. (SWL) 18-3, 18-18 
Lock and Dam No. 5, Minn. (NCD) 29-5 
Lock and Dam No. 5A, Minn. (NCD) 29-5 
Lock and Dam No. 6, Allegheny River, Pa. (ORP) 
26-24 
Lock and Dam No. 6, Wis. (NCD) 29-5 
Lock and Dam No. 7, Allegheny River, Pa. (ORP) 
26-24 
Lock and Dam No. 7, Minn. (NCD) 29-5 
Lock and Dam No. 7, Monongahela River, Pa. (ORP) 
26-25 
Lock and Dam No. 8, Allegheny River, Pa. (ORP) 
26-24 
Lock and Dam No. 8, Monongahela River, Pa. (ORP) 
26-25 
Lock and Dam No. 
Lock and Dam No. 
26-24 
Lock and Dam No. 
Lock and Dam No. 
Lock and Dam No. 
Lock and Dam No. 
Lock and Dam No. 
Lock and Dam No. 
Lock and Dam No. 
18-20, 19-16 
8, Wis. (NCD) 29-5 
9, Allegheny River, Pa. (ORP) 
9, Ark. (SWL) 18-3, 18-19 
9, Wis. (NCD) 29-5 
10, Iowa (NCD) 29-5 
11, Ark. (SWL) 18-20 
11, Iowa (NCD) 29-5 
12, Iowa (NCD) 29-5 
13, Ark. (SWL) (SWT) 18-3, 
Lock and Dam No. 13, Iowa (NCD) 29-5 
Lock and Dam No. 14, Iowa (NCD) 29-5 
Lock and Dam No. 15, Ill. (NCD) 29-5 
Lock and Dam No. 16, Iowa (NCD) 29-5 
Lock and Dam No. 17, Ill. (NCD) 29-6 
Lock and Dam No. 18, Iowa (NCD) 29-6 
Lock and Dam No. 19, Iowa (NCD) 29-6 
Lock and Dam No. 20, Mo. (NCD) 29-6 
Lock and Dam No. 21, Ill. (NCD) 29-6 
Lock and Dam No. 22, Mo. (NCD) 29-6 
Lock and Dam No. 24, Mo. (NCD) 29-6 
Lock and Dam No. 25, Mo. (NCD) 29-6 
Lock and Dam No. 26, Ill. (NCD) 29-6 
Lock and Dam No. 52, Ill. (ORD) 22-3, 22-10 
Lock and Dam No. 53, Ill. (ORD) 22-3, 22-10 
Lock S-53, Fla. (SAJ) 9-49 
Lock S-55, Fla. (SAJ) 9-49 
Lock S-57, Fla. (SAJ) 9-48 
Lock S-58, Fla. (SAJ) 9-48 
Lock S-59, Fla. (SAJ) 9-48 
1-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Lock S-60, Fla. (SAJ) 9-48 
Lock S-61, Fla. (SAJ) 9-48 
Lock S-62, Fla. (SAJ) 9-48 
Lock S-63, Fla. (SAJ) 9-48 
Lock S-63A, Fla. (SAJ) 9-48 
Lock S-65, Fla. (SAJ) 9-48 
Lock S-65A, Fla. (SAJ) 9-48 
Lock S-65B, Fla. (SAJ) 9-48 
Lock S-65C, Fla. (SAJ) 9-48 
Lock S-65D, Fla. (SAJ) 9-48 
Lock S-65E, Fla. (SAJ) 9-48 
Lock S-96, Fla. (SAJ) 9-48 
Lock S-96A, Fla. (SAJ) 9-48 
Lock S-157, Fla. (SAJ) 9-48 
Lock S-158, Fla. (SAJ) 9-48 
Lock S-193, Fla. (SAJ) 9-48 
Lock S-308B, Fla. (SAJ) 9-48 
Lock S-310, Fla. (SAJ) 9-48 
Lock Haven, Pa. (NAB) 4-20, 4-36 
Locklies Creek, Va. (NAO) 5-23 
Lockport Lock and Dam, Ill. (NCC) 28-20, 28-21 
Lockwoods Folly River, N.C. (SAW) 6-5, 6-18 
Logan, Ohio (ORH) 25-20 
Logan Creek, Bank Protection, near Bancroft, Nebr. 
(MRO) 21-20 
Lone Rock, Ark. (SWL) 18-18 
Long Beach Island, N.J. (NAP) 3-23 
Long Branch Lake, Mo. (MRK) 20-4, 20-11, 20-14 
Long Island Intracoastal Waterway, N.Y. (NAN) 2-7, 
2-23, 2-28, 2-33 
Long Lake Area, Helena, Ark. (LMM) 13-6 
Long Tom River, Oreg. (NPP) 37-39 
Longboat Pass, Fla. (SAJ) 9-8, 9-27, 9-34 
Lookout Point Lake, Oreg. (NPP) 37-21, 37-28, 
37-38, 37-47, 37-49 
Lopez Canyon Diversion, Los Angeles River Basin, 
Calif. (SPL) 33-22 
Lopez Dam, Los Angeles River Basin, Calif. (SPL) 
33-22 
Lorain Harbor, Ohio (NCB) 32-7, 32-20, 32-30 
Los Angeles and Long Beach Harbors, Calif. (SPL) 
33-2, 33-10, 33-14 
Los Angeles County Drainage Area, Calif. (SPL) 
33-5, 33-11, 33-16, 33-22, 33-23 
Los Coches Creek, Calif. (SPL) 33-6, 33-11, 33-16 
Lost Creek, Columbus, Nebr. (MRO) 21-4, 21-11, 
21-13 
Lost Creek Drainage and Levee District, Ill. (NCR) 
28-14, 28-17 
Lost Creek Lake, Oreg. (NPP) 37-21, 37-29, 
37-38, 37-47 
Lost River, Minn. (NCS) 27-24 
Louisville, Ky. (ORL) 24-20, 24-24, 24-29 
Louisville Lake, Ill. (ORL) 24-21, 24-28 
Loup River, Columbus, Nebr. (MRO) 21-17 
Loves Park, Ill. (NCR) 28-9 
Lowell, Mass. (NED) 1-22, 1-43, 1-51 
Lowell Creek, Alaska (NPA) 40-14 
Lower Arkansas River, Ark. (MR+T) 42-16, 42-28, 
42-54, 42-57 
Lower Arkansas River Basin, Ark. (MR+T) 42-7 
Lower Big Sioux River, Iowa and S. Dak. (MRO) 
21-17 
Lower Branch Rush River, N. Dak. (NCS) 27-24 
Lower Columbia River Basin, Oreg. and Wash. 
(NPP) 37-15, 37-36, 37-41, 37-48 
Lower Cowlitz River, Wash. (NPP) 37-40 
Lower Creek, Lenoir, N.C. (SAW) 6-31 
Lower Dry Creek, Lowden, Wash. (NPW) 39-14 
Lower Gila River Levee and Channel Improvements 
(Gila River and Tributaries) Downstream from 
Painted Rock Dam, Ariz. (SPL) 33-19 
Lower Grand River, Mo. (MRK) 20-17 
Lower Granite Lock and Dam, Wash. (NPW) 39-5, 
39-9, 39-12, 39-20, 39-22 
Lower Guyandotte River Basin, W. Va. (ORH) 25-20 
Lower Heart River, N. Dak. (MRO) 21-17 
Lower Machodoc Creek, Va. (NAB) 4-34 
Lower Monumental Lock and Dam, Wash. (NPW) 
39-6, 39-9, 39-12, 39-20, 39-22 
Lower Red River-South Bank, Red River Levees, 
La. (MR+T) 42-9, 42-15, 42-28, 42-46, 42-49, 
42-57 
Lower Red River Standard Revetments (MR+T) 
42-33, 42-37 
Lower San Francisco Bay, Calif. (SPN) 34-8 
Lower San Joaquin River, Calif. (SPK) 35-11, 
35-24, 35-33 
Lower San Joaquin River and Tributaries, including 
Tuolumne and Stanislaus Rivers, Calif. (SPK) 
35-25, 35-31 
Lower Snake River, Wash., Oreg., Idaho, Fish and 
Wildlife Compensation (NPW) 39-6, 39-10, 
39-12 
Lower Thorofare, Deal Island, Md. (NAB) 4-6, 
4-22, 4-29 
Lower Walla Walla River, Wash. (NPW) 39-14, 
39-16 
Lower White River and Basin, Ark. (MR+T) 42-9, 
42-17, 42-28, 42-53 
Lower White River Levees (MR+T) 42-9, 42-48, 
42-49, 42-57 
Lower Woonsocket, R.I. (NED) 1-43, 1-48 
Lowes Wharf, Md. (NAB) 4-6, 4-23, 4-29 
Loyalhanna Lake, Pa. (ORP) 26-7, 26-14, 26-19, 
26-27 
Loyalsock, Pa. (NAB) 4-39 
Lubec, Maine (NED) 1-22 
Lubec Channel, Maine (NED) 1-39 
Lucky Peak Lake, Idaho (NPW) 39-3, 39-9, 39-11 
Ludington Harbor, Mich. (NCE) 31-12, 31-38, 
31-51 
I-26

INDEX 
Ludlow, Ky. (ORL) 24-22, 24-25 
Ludlow Lake, Vt. (NED) 1-45 
Lukfata Lake, Okla. and Ark. (SWT) 19-15 
Lusk Creek, Ill. (ORL) 24-30 
Lutsen Harbor, Minn. (NCE) 31-62 
Lyford Levee, Ind. (ORL) 24-20, 24-29 
Lyman Creek, Idaho (NPW) 39-14 
Lynches River and Clark Creek, S.C. (SAN) 7-15 
Lynn Harbor, Mass. (NED) 1-39 
Lynn-Nahant Beach, Mass. (NED) 1-9, 1-27, 
1-35, 1-42 
Lynnhaven Inlet, Va. (NAO) 5-23 
Lytle and Cajun Creeks channel improvements, 
Calif. (SPL) 33-24 
Lytle and Warm Creeks, Calif. (SPL) 33-6, 33-12, 
33-16 
M 
Maalaea Small Boat Harbor, Hawaii (POD) 36-8 
MacDowell, Edward, Lake, N.H. (NED) 1-18, 1-30, 
1-51 
Machias River, Maine (NED) 1-23, 1-39 
Mackay Creek, N.C. (SAW) 6-25, 6-28 
Mackinac Island Harbor, Mich. (NCE) 31-13, 
31-38, 31-51 
Mackinaw City Harbor, Mich. (NCE) 31-13, 31-38, 
31-51 
Macon, Ga. (SAS) 8-7, 8-16 
Macy, Nebr. (MRO) 21-20 
Mad Creek, Muscatine, Iowa (NCR) 28-17 
Mad River, Conn. (NED) 1-22, 1-48 
Mad River Basin, Calif. (SPK) 35-31 
Mad River Lake, Conn. (NED) 1-43 
Madison, Ind. (ORL) 24-22, 24-25 
Madison, Nebr. (MRO) 21-17, 21-20 
Madison Bay, Md. (NAB) 4-34 
Madison Parish Port, La. (LMK) 12-14 
Magruder Drainage District, Oreg. (NPP) 37-40, 
37-44, 37-48 
Mahnomen, Minn. (NCS) 27-27 
Mahoning Creek Lake, Pa. (ORP) 26-7, 26-14, 
26-19, 26-27 
Maiden Creek Reservoir, Pa. (NAP) 3-23 
Maintenance and Repair Fleet and Marine 
Terminals, Ark. (SWL) 18-3, 18-21 
Malden River, Mass. (NED) 1-39 
Malheur Improvement District, Oreg. (NPW) 39-14 
Malheur River, Oreg. (NPW) 39-14, 39-16, 39-17 
Mamaroneck Harbor, N.Y. (NAN) 2-34 
Manasquan River, N.J. (NAP) 3-7, 3-16, 3-19 
Manatee County, Fla. (SAJ) 9-47 
Manatee River, Fla. (SAJ) 9-45, 9-46 
Manchester, Ohio (ORH) 25-21 
Manchester Harbor, Mass. (NED) 1-45 
Mandan, N. Dak. (MRO) 21-17, 21-19 
Manele Bay Small Boat Harbor, Hawaii (POD) 36-2 
Manhasset Bay, N.Y. (NAN) 2-34 
Manhattan, Kans. (MRK) 20-17, 20-19 
Maniece Bayou, Ark. (LMN) (LMK) 11-16, 12-17, 
12-19 
Manistee Harbor, Mich. (NCE) 31-13, 31-38, 
31-51 
Manistique Harbor, Mich. (NCE) 31-61, 31-62 
Manitowoc Harbor, Wis. (NCE) 31-14, 31-38, 
31-51 
Mankato and North Mankato, Minn. (NCS) 27-10, 
27-20 
Mann's Harbor, N.C. (SAW) 6-28 
Manokin River, Md. (NAB) 4-34 
Mansfield Hollow Lake, Conn. (NED) 1-21, 1-31, 
1-52 
Manteo (Shallowbag) Bay, N.C. (SAW) 6-6, 6-19 
Mantua Creek, N.J. (NAP) 3-21 
Maple River, N. Dak. (NCS) 27-25 
Mapleshade, Ohio (ORH) 25-21 
Marblehead Harbor, Mass. (NED) 1-45 
Marengo, Iowa (NCR) 28-14, 28-17 
Marginal Way, Ogunquit, Maine (NED) 1-20, 1-23, 
1-31, 1-37 
Markham Ferry, Okla. (SWL) 18-22 
Marietta, Ohio (ORH) 25-21 
Marina Del Rey, Calif. (SPL) 33-18, 33-22 
Marine Design Center 53-5 
Marion, Ind. (ORL) 24-21, 24-28 
Marion, Kans. (SWT) 19-5, 19-11, 19-14, 19-17, 
19-18 
Marion County Drainage District, Mo. (NCR) 28-14, 
28-17 
Marion Lake, Kans. (SWT) 19-5, 19-11, 19-14, 
19-17 
Markham Ferry Lake, Okla. (SWL) 18-22 
Markham Ferry Reservoir, Okla. (SWT) 19-18 
Markland Locks and Dam, Ind. (ORD) 22-3, 22-6, 
22-9 
Marmarth, N. Dak. (MRO) 21-17, 21-19 
Marquette Harbor, Mich. (NCE) 31-14, 31-39, 
31-52 
Marseilles Lock and Dam, Ill. (NCC) 28-20 
Marsh Creek, Geneva, N.Y. (NCB) 32-37 
Marshalltown, Iowa (NCR) 28-14, 28-17 
Marshland Drainage District, Oreg. (NPP) 37-40 
Martin, John, Reservoir, Colo. (SWA) 17-2, 17-8 
Martin, Ky. (ORH) 25-20 
Martin Creek, Miss. (SAM) 10-15, 10-29, 10-39 
Martins Ferry, Ohio (ORP) 26-22, 26-26 
Martins Fork Lake, Ky. (ORN) 23-5, 23-9, 23-18 
Martis Creek Lake, Martis Creek, Nev. and Calif. 
(SPK) 35-11, 35-24 
Marysville, Kans. (MRK) 20-18 
Marysville Lake, Calif. (SPK) 35-31 
1-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Mason, W. Va. (ORH) 25-21 
Mason and Menard Drainage District, Ill. (NCR) 
28-14, 28-17 
Mason J. Niblack Levee, Ind. (ORL) 24-4, 24-14, 
24-20, 24-24, 24-29 
Massillon, Ohio (ORH) 25-6, 25-13, 25-17 
Matafao Shoreline, American Samoa (POD), 36-10 
Matagorda Ship Channel, Tex. (SWG) 15-6, 15-14, 
15-22, 15-30, 15-35 
Matawan Creek, N.J. (NAN) 2-34 
Matinicus Harbor, Maine (NED) 1-39 
Mats Mats Bay, Wash. (NPS) 38-25, 38-31 
Mattapoisett Harbor, Mass. (NED) 1-45 
Mattituck Harbor, N.Y. (NAN) 2-33, 2-34 
Mauckport, Ind. (ORL) 24-22, 24-25 
Maumee Bay State Park, Ohio (NCB) 32-12 
Maumee River, above Toledo, Ohio (NCB) 32-39 
Maunalua Bay Small Boat Harbor, Hawaii (POD) 
36-8 
Maurice River, N.J. (NAP) 3-21, 3-24 
Mauvaise Terre Drainage and Levee District, Ill. 
(LMS) 14-4, 14-9, 14-11 
Maxwell Locks and Dam, Pa. (ORP) 26-25 
Mayaguez Harbor, P.R. (SAJ) 9-9, 9-27, 9-34 
Mayo, W. D., Lock and Dam, Okla. (SWL) (SWT) 
18-20, 19-16 
Mayse, Pat, Lake, Tex. (SWT) 19-5, 19-11, 19-14, 
19-17 
Maysville, Ky. (ORH) 25-'20, 25-22 
McAlpine Locks and Dam (ORD) 22-3, 22-6, 22-9 
McClellan-Kerr Arkansas River Navigation System 
(SWT') 19-2, 19-9, 19-13, 19-16 
McCook Lake, S. Dak. (MRO) 21-17 
McDonald Dike Road, Ore. (NPP) 37-42 
McGee Creek Drainage and Levee District, Ill. 
(LMS) 14-5, 14-9, 14-12 
McGinnis Levee, Ind. (ORL) 24-22, 24-25 
McKees Rocks, Pa. (ORP) 26-23 
McKenzie River near Walterville, Oreg. (NPP) 
37-42 
McKinney Bayou, Finn Bayou Segment, Ark. (LMN) 
(LMK) 11-16, 12-17, 12-19 
McLean Bottom Levee District No. 3, Arkansas 
River, Ark. (SWL) 18-17 
McNary Lock and Dam-Lake Wallula-Oreg. and 
Wash. (NPW) 39-7, 39-8, 39-10, 39-12, 39-21 
Meadow Grove, Nebr. (MRO) 21-20 
Medomak River, Maine (NED) 1-39 
Meherrin River, N.C. (NAO) 5-23 
Mekoryuk, Alaska (NPA) 40-3, 40-8, 40-11 
Melbourne Harbor, Fla. (SAJ) 9-9, 9-27, 9-34 
Meldahl, Captain Anthony, Locks and Dam, Ky. 
(ORD) 22-3, 22-8 
Melton Hill Lock and Dam, Tenn. (ORN) 23-17 
Melvern Lake, Kans. (MRK) 20-4, 20-11, 20-14, 
20-19 
Melvern Lake and Pomona Lake (Road 
Improvement), Kans. (MRK) 20-19 
Memphis Harbor, Tenn. (MR+T) 42-29 
Memphis Harbor Project Levees (MR+T) 42-48, 
42-49 
Memphis, Wolf River, and Nonconnah Creek, Tenn. 
(LMM) 13-6 
Menasha Lock and Dam (NCE) 31-60 
Menemsha Creek, Martha's Vineyard, Mass. (NED) 
1-39 
Menominee Harbor and River, Mich. and Wis. (NCE) 
31-15, 31-39, 31-52 
Meramec Park Lake, Mo. (LMS) 14-5, 14-9 
Meramec River Basin, Mo. (LMS) 14-4, 14-12, 
14-13 
Merced County Stream Group, Calif. (SPK) 35-12, 
35-24, 35-34 
Merced County Streams, Calif. (SPK) 35-11, 35-24 
Merced River, Calif. (SPK) 35-31 
Mercer Lake, Mo. (MRK) 20-17 
Meredosia, Ill., and Meredosia, Willow Creek, and 
Coon Run Drainage and Levee Districts, Ill. 
(LMS) 14-5, 14-9, 14-12 
Meredosia Lake and Willow Creek Drainage and 
Levee District, Ill. (LMS) 14-6, 14-10, 14-12, 
14-14 
Meredosia Levee and Drainage District, Ill. (NCR) 
28-14, 28-17 
Mermentau River, La. (LMN) 11-14 
Mermentau River, Bayou Nezpique, and Bay Des 
Cannes, La. (LMN) 11-14 
Merriam, Kans. (MRK) 20-18 
Merriconeag Sound, Harpswell, Maine (NED) 1-43 
Merrimack River, Mass. (NED) 1-39, 1-51 
Merrimack River Basin, N.H. and Mass. (NED) 
1-18, 1-23, 1-51 
Merrimack River, Concord, N.H. (NED) 1-23 
Metamora Lake, Ind. (ORL) 24-22, 24-27 
Methow River, Wash. (NAS) 38-27 
Metlakatla Harbor, Alaska (NPA) 40-4, 40-8, 
40-11 
Metropolis, Ill. (ORL) 24-21, 24-24 
Miami Harbor, Fla. (SAJ) 9-9, 9-27, 9-34 
Miami River, Fla. (SAJ) 9-45 
Miami River, Oreg. (NPP) 37-42 
Mianus River, Conn. (NED) 1-39 
Michael J. Kirwan Dam and Reservoir, Ohio (ORP) 
26-8, 26-14, 26-19, 26-27 
Michigan City Harbor, Ind. (NCC) 30-5, 30-9, 
30-12, 30-14, 30-15 
Middle Beach, Conn. (NED) 1-42 
Middle Creek, Calif. (SPK) 35-31 
Middle Fork Nooksack River, Deming, Wash. (NPS) 
38-9, 38--16, 38-22 
Middle Gila River Channel Improvements, Upper 
End of Safford Valley to Buttes Damsite 
1-28

INDEX 
(Camelsback Damsite to Salt River), Ariz. (SPL) 
33-19 
Middle Pebble Creek, Snyder, Nebr. (MRO) 21-21 
Middle River and Connecting Channels, Calif. (SPK) 
35-30 
Middle River and Dark Head Creek, Md. (NAB) 
4-34 
Middle River at Argyle, Minn. (NCS) 27-11, 27-20 
Middleport, Ohio (ORH) 25-21 
Middlesboro, Ky. (ORN) 23-5, 23-9 
Middlesboro, Ky. (Diversion Canal) (ORN) 23-19 
Middlesboro, Ky. (Yellow Creek) (ORN) 23-13, 
23-18, 23-19 
Middleton Shoals, Ga. and S.C. (SAS) 8-17 
Midland Drainage District, Oreg. (NPP) 37-40, 
37-41, 37-48 
Milan, Ill. (NCR) 28-5, 28-9, 28-12, 28-17 
Miles City, Mont. (MRO) 21-17 
Milford Harbor, Conn. (NED) 1-39, 1-53 
Milford Haven, Va. (NAO) 5-23 
Milford Lake, Kans. (MRK) 20-4, 20-11, 20-14, 
20-19 
Mill Brook, Brownsville, Vt. (NED) 1-14, 1-23, 
1-28 
Mill Creek, Ky. (ORL) 24-20, 24-27, 24-30 
Mill Creek, Md. (NAB) 4-37 
Mill Creek, N.C. (SAW) 6-28 
Mill Creek, Ohio (ORL) (ORH) 24-4, 24-14, 25-21 
Mill Creek, Tex. (SWG) 15-27 
Mill Creek, Va. (NAO) 5-23 
Mill Creek, Wash. (NPW) 39-16 
Mill Creek and South Slough at Milan, Ill. (NCR) 
28-3, 28-8, 28-11 
Mill Creek, Fort Smith, Ark. (SWL) 18-- 6, 18-12 
Mill Creek Lake, Wash. (NPW) 39-3, 39-9, 39-11 
Mill Creek levees, Calif. (SPL) 33-20 
Mill Four Drainage District, Oreg. (NPP) 37-42 
Mill Lake, Mo. (MRK) 20-17 
Miller, Ohio (ORH) 25-20 
Miller Pond Drainage District, Ill. (LMS) 14-14 
Millers Ferry Lock and Dam, Ala. (SAM) 10-20, 
10-30 
Millersburg, Ohio (ORH) 25-21 
Millican Lake, Tex. (SWF) 16-9, 16-16, 16-20 
Millwood, W. Va. (ORH) 25-21 
Millwood Lake, Little River Basin, Ark. (SWL) 18-6, 
18-12, 18-23 
Milton, Ky. (ORL) 24-22, 24-25 
Milton, Pa. (NAB) 4-39 
Milton-Freewater, Oreg. (NPW) 39-14 
Milton Harbor, N.Y. (NAN) 2-34 
Milwaukee Harbor, Wis. (NCE) 31-15, 31-39, 
31-52 
Mineral Creek, Wash. (NPS) 38-27 
Mingo Creek, S.C. (SAN) 7-15 
Mingo Junction, Ohio (ORP) 26-23 
Mining City Lake, Ky. (ORL) 24-21, 24-27 
Minneota, Minn. (NCS) 27-24 
Minnesota River, Minn. (NCS) 27-2, 27-19, 27-22 
Minnesota River at Le Sueur, Minn. (NCS) 27-11, 
27-20 
Minot, N. Dak. (NCS) 27-24, 27-27 
Mispillion River, Del. (NAP) 3-7, 3-14, 3-16, 3-19 
Misquamicut Beach, Westerly, R.I. (NED) 1-42 
Mission and Lapwai Creeks, Idaho (NPW) 39-15 
Mission Zanja Creek, Calif. (SPL) 33-25 
Missisquoi River at Richford, Vt. (NAN) 2-36, 2-39 
Mississinewa Lake, Ind. (ORL) 24-9, 24-16 
Mississippi and Leech Rivers, Minn. (NCS) 27-23 
Mississippi Delta Region, La. (MR+T) 42-28 
Mississippi River Agricultural Area No. 8, Mo. (LMS) 
14-6, 14-10, 14-12 
Mississippi River Agricultural Area No. 10, Mo. 
(LMS) 14-15 
Mississippi River Agricultural Area No. 12, Mo. 
(LMS) 14-15 
Mississippi River Alluvial Valley Mapping (MR+T) 
42-3 
Mississippi River, Alton to Gale, Ill., Underseepage 
Measures (LMS) 14-15 
Mississippi River and Alluvial Valley below Cape 
Girardeau, Mo. (MR+T) 42-2 
Mississippi River and Tributaries (MR+T) 42-1 to 
42-63 
Mississippi River and Tributaries-Channel 
Improvements (MR+T) 42-4 
Mississippi River and Tributaries-Levees (MR+T) 
42-4 
Mississippi River at Alton, Ill. (LMS) 14-13 
Mississippi River at St. Louis, Mo. (LMS) 14-15 
Mississippi River Bank Revetments and Dikes 
(MR+T) 42-30, 42-34, 42-39 
Mississippi River, Baton Rouge to Gulf of Mexico, 
La. (LMN) 11-2, 11-10, 11-12 
Mississippi River between Brainerd and Grand 
Rapids, Minn. (NCS) 27-23 
Mississippi River between Missouri River and 
Minneapolis, Minn. (NCS) (NCD) 27-2, 28-3, 
29-1, 29-4, 29-10 
Mississippi River between Ohio and Missouri Rivers, 
Mo. and Ill. (LMS) 14-2, 14-9, 14-11 
Mississippi River Channel Improvements (MR+T) 
42-29, 42-50, 42-51, 42-53 
Mississippi River Commission (MR+T) 42-1 
Mississippi River Delta at and below New Orleans, 
La., (New Orleans to Venice, La., Hurricane 
Protection) (LMN) 11-8, 11-11, 11-13 
Mississippi River Delta Region, La. (MR+T) 42-59 
Mississippi River-Gulf Outlet, La. (LMN) 11-3, 
11-10, 11-12 
Mississippi River-Gulf Outlet, Michoud Canal, La. 
(LMN) 11-15 
I-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Mississippi River Headwater Reservoirs, Minn. 
(NCS) 27-2, 27-19, 27-22, 27-26 
Mississippi River Improvements (MR+T) 42-11 
Mississippi River Levees (MR+T) 42-10, 42-28, 
42-44, 42-46, 42-47, 42-49 
Mississippi River Main Stem Channel Improvements 
(MR+T) 42-29 
Mississippi River near Aitkin, Minn. (NCS) 27-24 
Mississippi River Outlets, Venice, La. (LMN) 11-4, 
11-10, 11-12 
Mississippi River Project Levees (MR+T) 42-44, 
42-46, 42-47, 42-49 
Mississippi River Tributary and Outlet 
Improvements (MR+T) 42-13 
Mississippi River Tributary Dams and Lakes 
(MR+T) 42-20 
Missouri National Recreational River, Nebr. and S. 
Dak. (MRO) 21-4, 21-11, 21-13 
Missouri River, Mo. (MR+T) 42-19 
Missouri River at New Haven, Mo. (MRK) 20-17 
Missouri River, Aten, Nebr. (MRO) 21-17 
Missouri River, Bank Protection, Greenwood, S. 
Dak. (MRO) 21-20 
Missouri River, Bank Stabilization, Fort Benton, 
Mont. (MRO) 21-19 
Missouri River, Garrison Dam to Lake Oahe, N. Dak. 
(MRO) 21-5, 21-11, 21-14, 21-19 
Missouri River, Kenslers Bend, Nebr. to Sioux City, 
Iowa (MRO) 21-5, 21-11, 21-14 
Missouri River Levee System, Iowa, Nebr., Kans., 
and Mo. (Rulo, Nebr. to Mouth) (MRK) 20-5, 
20-11, 20-14, 20-18, 20-19, 20-21 
Missouri River Levee System, Iowa, Nebr., Kans., 
and Mo. (Sioux City, Iowa, to Rulo, Nebr.) (MRO) 
21-5, 21-11, 21-14, 21-18, 21-19, 21-21 
Missouri River Main Stem (MRK) 20-19 
Missouri River, Marina, Sioux City, Iowa (MRO) 
21-21 
Missouri River, Niobrara, Nebr. (MRO) 21-17 
Missouri River, Sioux City, Iowa, to Fort Benton, 
Mont. (MRO) 21-16 
Missouri River, Sioux City, Iowa, to Mouth (Rulo, 
Nebr., to Mouth) (MRK) 20-2, 20-10, 20-13 
Missouri River, Sioux City, Iowa, to Rulo, Nebr. 
(MRO) 21-2, 21-10, 21-13, 21-18 
Mitigation of Shore Damages, Detroit, Mich., District 
(NCE) 31-26 
Mobile Bay, Ala. to New Orleans, La. (SAM) 
10-35 
Mobile Harbor, Ala. (SAM) 10-9, 10-27, 10-36 
Mocassin Swamp, N.C. (SAW) 6-28 
Moccasin Springs, Mo. (LMS) 14-13 
Moclips River, Wash. (NPS) 38-27 
Mojave River Dam, Calif. (SPL) 33-6, 33-12, 
33-17 
Mokelumne River, Calif. (SPK) 35-30 
Molalla River at Milk Creek location, Oreg. (NPP) 
37-42 
Molalla River at Ressel location, Oreg. (NPP) 37-42 
Moline, Ill. (NCR) 28-9, 28-13 
Moline Harbor, Ill. (NCD) 29-7 
Monona-Harrison Ditch Control, Monona County, 
Iowa (MRO) 21-21 
Monongahela River, Pa. and W. Va. Locks and Dams 
(ORP) 26-2, 26-13, 26-17, 26-25, 26-26 
Monoosnoc Brook, Mass. (NED) 1-43, 1-51 
Monoosnoc Lake, Mass. (NED) 1-43, 1-51 
Monroe, La., floodwall extension (LMK) 12-16 
Monroe Bay and Creek, Va. (NAB) 4-34 
Monroe Floodwall, La. (LMK) 12-19 
Monroe Harbor, Mich. (NCE) 31-16, 31-39, 31-52 
Monroe Lake, Ind. (ORL) 24-9, 24-16, 24-27 
Montcalm, W. Va. (ORH) 25-22 
Monterey Harbor, Calif. (SPN) 34-8 
Montgomery Locks and Dam, Pa. (ORD) 22-2, 
22-7 
Montour Falls, N.Y. (NCB) 32-37 
Moore Haven Lock, Fla. (SAJ) 9-48 
Moorefield, W. Va. (NAB) 4-37 
Moores Ferry, Va. (ORH) 25-20 
Moorhead, Minn. (NCS) 27-25 
Mooring for Battleship Oregon, Oreg. (NPP) 37-39 
Moosabec Bar, Maine (NED) 1-39 
Morehead City Harbor, N.C. (SAW) 6-7, 6-19 
Morgan City and Vicinity, La. (LMN) 11-7, 11-10, 
11-13 
Morgantown Lock and Dam, W. Va. (ORP) 26-25 
Morganza Floodway, La. (MR+T) 42-50 
Moriches Inlet, N.Y. (NAN) 2-7, 2-23, 2-28 
Mormon Slough, Calif. (SPK) 35-31 
Morrison, Colo. (MRO) 21-18 
Morrison Creek Stream Group, Calif. (SPK) 35-20 
Morristown Harbor, N.Y. (NCB) 32-35 
Morro Bay Harbor, Calif. (SPL) 33-2, 33-10, 
33-15 
Moscow, Ohio (ORL) 24-22, 24-25 
Mosquito Creek Lake, Ohio River Basin, Ohio (ORP) 
26-8, 26-14, 26-19, 26-27 
Moss Bluff Lock, Fla. (SAJ) 9-52 
Moss Landing Harbor, Calif. (SPN) 34-5 
Mott, N. Dak. (MRO) 21-17 
Mound City Locks and Dam, Ill. (ORD) 22-1, 
22-10 
Mounds and Mound City, Ill. (LMM) 13-6 
Moundsville, W. Va. (ORP) 26-22, 26-26 
Mount Clemens, Clinton River, Mich. (NCE) 31-63 
Mount St. Helens and Vicinity, Wash. (NPP)37-15, 
37-27, 37-37 
Mount St. Helens Emergency Measures, Wash. 
(NPP) 37-13 
Mount St. Helens Sediment Control, Wash. (NPP) 
37-16, 37-27, 37-37 
1-30

INDEX 
Mountain Brook Dam, N.H. (NED) 1-45 
Mountain Park Reservoir (Tom Steed Lake), Okla. 
(SWT) 19-18 
Mouth of Yazoo River, Miss. (LMK) 12-14 
Moyock Creek, N.C. (SAW) 6-28 
Mt. Baldy, Indiana Dunes National Lakeshore, Ind. 
(NCC) 30-15 
Mt. Carmel, Ill. (ORL) 24-20, 24-29 
Mt. Holly, N.J. (NAP) 3-23 
Mt. Morris Lake, N.Y. (NCB) 32-15, 32-22 
Mud and Basket Slough, Rickreall Creek, Oreg. 
(NPP) 37-44 
Mud Creek, Broken Bow, Nebr. (MRO) 21-17, 
21-20 
Mud Lake, Idaho (NPW) 39-15, 39-16 
Mud Lake Pumping Station, Tenn. (MR+T) 42-28 
Mud Mountain Dam, Wash. (NAS) 38-9, 38-16, 
38-22 
Mud River, W. Va. (ORH) 25-21 
Muddy Creek Dam, Pa. (ORP) 26-22 
Muddy Creek near Syracuse, Nebr. (MRO) 21-20 
Muddy Hook and Tyler Coves, Md. (NAB) 4-34, 
4-38 
Mulberry Creek, Va. (NAO) 5-23 
Mullet Key, Fla. (SAJ) 9-47 
Multnomah Chaniel, Oreg. (NPP) 37-39 
Multnomah Drainage District 1, Oreg. (NPP) 37-40, 
37-41, 37-48 
Muncie, Ind. (ORL) 24-20, 24-29 
Munday Floodway, Tex. (SWF) 16-22 
Murder and Burnt Corn Creeks, Brewton, Ala. 
(SAM) 10-15, 10-29, 10-39, 10-43 
Murder Creek, East Brewton, Ala. (SAM) 10-14, 
10-29, 10-39 
Murderkill River, Del. (NAP) 3-7, 3-14, 3-16, 
3-19 
Murfreesboro Dam and Lake (LMK) 12-19 
Murray Lock - Dam, Ark. (SWL) 18-3, 18-19 
Murrells Inlet, S.C. (SAN) 7-5, 7-10, 7-13 
Muscatatuck River, Crothersville, Ind. (ORL) 24-30 
Muscatine, Iowa (Mad Creek) (NCR) 28-14 
Muscatine Harbor, Iowa (NCD) 29-7 
Muscatine Island L. and D. D., Louisa D. D. No. 13, 
Iowa (NCR) 28-14, 28-17 
Muscooten Bay, Ill. (NCR) 28-13 
Muskegon Harbor, Mich. (NCE) 31-16, 31-39, 
31-52 
Muskingum River, Ohio (ORH) 25-19 
Muskingum River Lakes, Ohio (ORH) 25-7, 25-14, 
25-17 
Mustinka River, Minn. (NCS) 27-27 
Myers Chuck Harbor, Alaska (NPA) 40-13 
Myrtle Beach, S.C. (SAN) 7-17 
Mystic, Conn. (NED) 1-45 
Mystic River, Conn. (NED) 1-39 
Mystic River, Mass. (NED) 1-6, 1-26, 1-34 
N 
Naches River, Naches, Wash. (NPS) 38-27 
Nagel Drainage District, Iowa (MRO) 21-21 
Nahunta Swamp, N.C. (SAW) 6-28 
Naknek River, Alaska (NPA) 40-13 
Namo River, Territory of Guam (POD) 36-11 
Nan Cove, Md. (NAB) 4-34 
Nandua Creek, Va. (NAO) 5-23 
Nanpil River Hydropower, Pohnpei, Trust Territory 
of the Pacific Islands (POD) 36-5, 36-6, 36-7 
Nansemond River, Va. (NAO) 5-23 
Nantasket Beach, Mass. (NED) 1-42 
Nanticoke River, Md. (NAB) 4-34 
Nanticoke River at Bivalve, Md. (NAB) 4-34 
Nanticoke River (including Northwest Fork), Del. 
and Md. (NAB) 4-34 
Nantucket (Harbor of Refuge), Mass. (NED) 1-39 
Napa River, Calif. (SPN) 34-5 
Napa River Basin, Calif. (SPK) 35-31 
Napatree Beach, R.I. (NED) 1-45 
Narragansett Pier, R.I. (NED) 1-45 
Narraguagus River, Maine (NED) 1-24, 1-39, 1-53 
Narrows Dam-Lake Greeson, Ark. (LMK) 12-16, 
12-19 
Narrows of Lake Champlain, N.Y. and Vt. (NAN) 
2-8, 2-23, 2-28, 2-33 
Nashua, N.H. (NED) 1-22, 1-43, 1-51 
Natchez Port Area, Miss. (LMK) 12-19 
Natchitoches Parish, La. (LMN) (LMK) 11-16, 
12-18, 12-19 
National Dredging Program 53-4 
National Emergency Management Activities, 
Huntington, W.Va., District (ORH) 25-11 
National Emergency Preparedness Activities, 3-14, 
21-9, 32-16, 48-1 
Natural Disaster Activities, New York District (NAN) 
2-20 
Natural Disaster Preparedness, Response and 
Recovery Activities, 43-1 
Navajo Reservoir, N. Mex. (SPK) 35-30 
Navarro Mills Lake, Tex. (SWF) 16-9, 16-16, 
16-20 
Navasota Lake, Tex. (SWF) 16-22 
Navigation Aids (U.S. Coast Guard), Ark. (SWL) 
18-21 
Navigation Locks and Dams, Ark. (SWL) 18-11 
Navigation Work under Special Authorization 
(Calcasieu Pass Channel in Old River Bend at 
Cameron, La.) (LMN) 11-15 
Nawiliwili Harbor, Hawaii (POD) 36-3, 36-6, 36-7 
Nawiliwili Small Boat Harbor, Hawaii (POD) 36-8 
NCD Master Plan for Water Control Data System 
31-30 
Neabsco Creek, Md. (NAB) 4-34 
Neah Bay, Wash. (NPS) 38-25 
1-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Neale Sound, Md. (NAB) 4-34 
Near Dardanelle, Arkansas River, Ark. (SWL) 18-17 
Near Springfield on Sangamon River, Ill. (NCR) 
28-14 
Neavitt Harbor, Md. (NAB) 4-34 
Neches River and Tributaries, Salt Water Barrier at 
Beaumont, Tex. (SWG) 15-27 
Needles, Calif. (SPL) 33-20, 33-31 
Nehalem Bay, Oreg. (NPP) 37-7, 37-25, 37-34 
Neodesha Lake, Kans. (SWL) (SWT) 18-22, 19-15, 
19-16 
Neon-Fleming, Ky. (ORL) 24-20, 24-30 
Neshaminy State Park Harbor, Pa. (NAP) 3-21 
Nestucca River, Oreg. (NPP) 37-39, 37-42 
Neuse River, N.C. (SAW) 6-25, 6-28 
Neuse River Barrier, N.C. (SAW) 6-28 
Neuse River Basin, N.C. (SAW) 6-12, 6-30 
Neuse River, 300 foot-wide channel in front of New 
Bern, N.C. (SAW) 6-28 
Neva and Olga Straits, Alaska (NPA) 40-13 
Neville Island, Pa. (ORP) 26-22, 26-26 
New Albany, Ind. (ORL) 24-20, 24-24, 24-29 
New Amsterdam, Ind. (ORL) 24-22, 24-25 
New Bedford and Fairhaven Harbors, Mass. (NED) 
1-39 
New Bedford, Fairhaven, and Acushnet, Mass. 
(NED) 1-19, 1-30, 1-36 
New Bedford-Fairhaven Hurricane Barrier, Mass. 
(NED) 1-23 
New Boston Harbor, Ill. (NCD) 29-7 
New Buffalo Harbor, Mich. (NCE) 31-16, 31-40, 
31-53 
New Bullards Bar, Calif. (SPK) 35-31 
New Cumberland, W. Va. (ORP) 26-23 
New Cumberland Locks and Dam, Stratton, Ohio 
(ORD) 22-7 
New Fairfield, Conn. (NED) 1-22 
New Harbor, Maine (NED) 1-39 
New Harmony, Ind. (ORL) 24-22, 24-25 
New Harmony Bridge, Ill. and Ind. (ORL) 24-20, 
24-21, 24-24 
New Haven Breakwater, Conn. (NED) 1-39 
New Haven Harbor, Conn. (NED) 1-6, 1-26, 1-34, 
1-38 
New Jersey Intracoastal Waterway (NAP) 3-8, 
3-16, 3-19 
New Kensington and Parnassus, Pa. (ORP) 26-22, 
26-26 
New Lock and Dam 26, Ill. (NCD) 29-6 
New London, Conn. (NED) 1-19, 1-22, 1-23, 
1-30, 1-37 
New London Harbor, Conn. (NED) 1-7, 1-26, 
1-34, 1-53 
New Madrid Harbor, Mo. (LMM) 13-5 
New Martinsville, W. Va. (ORH) 25-21 
New Matamoras, Ohio (ORH) 25-21 
New Melones Lake, Calif. (SPK) 35-19 
New Orleans to Venice, La., Hurricane Protection 
(LMN) 11-8, 11-11, 11-13 
New Pass, Sarasota, Fla. (SAJ) 9-10, 9-27, 9-35 
New Richmond, Ohio (ORL) 24-22, 24-25 
New River, Fla. (SAJ) 9-45, 9-46 
New River, N.C. (SAW) 6-27 
New River, Onslow County, N.C. (SAW) 6-27 
New River, Va. and W. Va. (ORH) 25-19 
New Rochelle Harbor, N.Y. (NAN) 2-34 
New York and New Jersey Channels, (NAN) 2-10, 
2-24, 2-29, 2-32, 2-33, 2-38 
New York Harbor, N.Y. (NAN) 2-33 
New York Harbor-Collection and Removal of Drift 
(NAN) 2-11, 2-24, 2-29 
New York Harbor-Entrance Channels and 
Anchorage Areas (NAN) 2-11, 2-24, 2-29 
New York Harbor, Supervisor of (NAN) 2-16, 2-25, 
2-32 
Newark, Ohio (ORH) 25-7, 25-14, 25-17, 25-20, 
25-22 
Newark Bay, Hackensack and Passaic Rivers, N.J. 
(NAN) 2-8, 2-23, 2-28, 2-33, 2-38 
Newaukum River, Wash. (NPS) 38-27 
Newbegun Creek, N.C. (SAW) 6-25 
Newburgh, Ind. (ORL) 24-20 
Newburgh Locks and Dam, Ind. (ORD) 22-3, 22-9 
Newburyport Harbor, Mass. (NED) 1-7, 1-26, 
1-34, 1-53 
Newhall Creek, Calif. (SPL) 33-25 
Newmarket Creek, Va. (NAO) 5-24 
Newport, Ark. (SWL) 18-17 
Newport, Ky. (ORL) 24-20, 24-21, 24-.24, 24-29 
Newport, Ohio (ORH) 25- 21 
Newport Bay Harbor, Calif. (SPL) 33-18 
Newport Harbor, R.I. (NED) 1-39 
Newport News, Va. (NAO) 5-24 
Newport News Creek, Va. (NAO) 5-23 
Newry-Old Pickens Dam and Lake, S.C. (SAS) 
8-17 
Newt Graham Lock and Dam, Okla. (SWL) (SWT) 
18-20, 19-16 
Newtown Creek, N.Y. (NAN) 2-9, 2-24, 2-29, 
2-33 
Niagara Remedial Works, N.Y. (NCB) 32-35 
Niagara River, N.Y. (NCB) 32-35, 32-39 
Niantic Bay and Harbor, Conn. (NED) 1-39 
Niblack, Mason J., Levee, Ind. (ORL) 24-4, 24-14, 
24-20, 24-24, 24-29 
Nicholasville, (Townfork) Vicinity, Ky. (ORL) 24-30 
Nichols, N.Y. (NAB) 4-36, 4-39 
Nickajack Lock and Dam, Tenn. (ORN) 23-17 
Nimrod Lake, Ark. (SWL) 18-7, 18-12, 18-22 
Ninilchik Harbor, Alaska (NPA) 40-4, 40-9, 40-12 
Nishnabotna River at Hamburg, Iowa (MRO) 21-17, 
21-21 
1-32

INDEX 
Nisqually River, Wash. (NPS) 38-27 
Nixon Creek, Tenn. (LMM) 13-6 
Nolin Lake, Ky. (ORL) 24-9, 24-16, 24-27 
Nome Harbor, Alaska (NPA) 40-4, 40-9, 40-12 
Nomini Bay and Creek, Va. (NAB) 4-34 
Nonconnah Blvd., Nonconnah Creek, Tenn. (LMM) 
13-6 
Nonconnah Creek, Interceptor Sewer, Memphis, 
Tenn. (LMM) 13-2, 13-4 
Nonewaug River, Conn. (NED) 1-43 
Nookagee Lake, Mass. (NED) 1-43, 1-51 
Nooksack River, Wash. (NPS) 38-27 
Norfolk, Nebr. (MRO) 21-17, 21-20 
Norfolk Floodwall, Va. (NAO) 5-24 
Norfolk Harbor, Va. (NAO) 5-6, 5-15, 5-19, 5-25 
Norfork Lake, Ark. (SWL) 18-9, 18-13, 18-24 
Normal, Ky. (ORH) 25-20 
Norman Reservoir (Lake Thunderbird), Okla. (SWT) 
19-18 
Norrell Lock - Dam (No. 1) - Entrance Channel, 
Ark. (SWL) 18-4, 18-18 
North Adams, Hoosic River Basin, Mass. (NAN) 
2-36 
North Alexander Drainage and Levee District, Ill. 
(LMS) 14-15 
North Andover and Lawrence, Mass. (NED) 1-45 
North Branch of Kokosing River Lake, Ohio (ORH) 
25-7, 25-14, 25-17 
North Canaan, Conn. (NED) 1-22, 1-43, 1-50 
North Ellenville, N.Y. (NAN) 2-36 
North Fork of Pound River Lake, Va. (ROH) 25-8, 
25-14, 25-17 
North Fork, Pit River at Alturas, Calif. (SPK) 35-31 
North Fork Skykomish River, Wash. (NPS) 38-27 
North Hampton Beach, North Hampton, N.H. (NED) 
1-45 
North Hartland Lake, Vt. (NED) 1-14, 1-28, 1-48 
North Little Rock, Arkansas River, Ark. (SWL) 
18-17 
North Nashua River, Fitchburg, Mass. (NED) 1-43 
North Nashua River, Lancaster, Mass. (NED) 1-43, 
1-51 
North River Dike, N.C. (SAW) 6-28 
North Scituate Beach, Scituate, Mass. (NED) 1-42 
North Second St., Memphis, Tenn. (Wolf River 
Bridge) (LMM) 13-6 ... 
North Shore of Long Island, Suffolk County, N.Y. 
(NAN) 2-36 
North Springfield Lake, Vt. (NED) 1-14, 1-28, 
1-48 
North Stratford, N.H. (NED) 1-22, 1-49 
North Wildwood, N.J. (NAP) 3-23 
Northampton, Mass. (NED) 1-22, 1-43, 1-49 
Northeast (Cape Fear) River, N.C. (SAW) 6-25, 
6-27 
Northeast Harbor, Maine (NED) i-39 
Northeast River, Md. (NAB) 4-34 
Northfield Brook Lake, Conn. (NED) 1-17, 1-29, 
1-49 
Northport Harbor, N.Y. (NAN) 2-34 
Northport Harbor, Wis. (NCE) 31-62 
Norwalk, Conn. (NED) 1-22, 1-43 
Norwalk Harbor, Conn. (NED) 1-39 
Norwalk-Wilton, Conn. (NED) 1-45 
Norwich, Conn. (NED) 1-43, 1-52 
Norwich, N.Y. (NAB) 4-36, 4-39 
Nottoway River, Va. (NAO) 5-7, 5-15, 5-20 
Noxubee River, Miss. (SAM) 10-15, 10-29, 10-39, 
10-42 
Noyo River and Harbor, Calif. (SPN) 34-5 
Nutwood Drainage and Levee District, Ill. (LMS) 
14-6, 14-10, 14-12 
O 
Oahe Dam-Lake Oahe, Missouri River Basin S. Dak. 
and N. Dak. (MRO) 21-9, 21-12, 21-16, 21-19 
Oak Bluffs Town Beach, Mass. (NED) 1-42 
Oak Orchard Harbor, N.Y. (NCB) 32-8, 32-20 
Oakdale, Pa. (ORP) 26-22 
Oakford Special Drainage District (NCR) 28-14, 
28-17 
Oakland Beach, Warwick, R.I. (NED) 1-42 
Oakland Harbor, Calif. (SPN) 34-5, 34-9 
Oates Creek, Ga. (SAS) 8-10, 8-16 
Obey River, Tenn. (ORN) 23-13 
Obion River, Tenn. (LMM) 13-5 
O'Brien, T.J., Lock and Dam, Ill. (NCC) 28-20, 
28-21 
Occohannock Creek, Va. (NAO) 5-23 
Occoquan Creek, Va. (NAB) 4-34 
Ocean Beach, Calif. (SPL) 33-19 
Ocean City, N.J. (NAP) 3-23 
Ocean City Harbor and Inlet and Sinepuxent Bay, 
Md. (NAB) 4-7, 4-23, 4-29 
Oceana, W. Va. (ORH) 25-20 
Oceanside, Calif. (SPL) 33-19 
Oceanside Harbor, Calif. (SPL) 33-2, 33-10, 33-15 
Ocholockonee (Ochlockney) River, Ga. and Fla. 
(SAM) 10-42 
Oconto Harbor, Wis. (NCE) 31-62 
Ocracoke Inlet, N.C. (SAW) 6-7, 6-19 
Ocracoke Island, N.C. (SAW) 6-27 
Ofu Airstrip, American Samoa (POD) 36-3, 36-6 
Ofu Small Boat Harbor, American Samoa (POD) 
36-8 
Ogdensburg Harbor, N.Y. (NCB) 32-9, 32-20, 
32-31 
Ohio National Wildlife Conservation Area (ORD) 
22-3 
Ohio River, Ill. and Ky. (MR+T) 42-19 
I-33

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Ohio River Basin (Huntington District) (ORH) 
25-8, 25-14 
Ohio River Basin (Louisville Dist.) (ORL) 24-10, 
24-16, 24-18, 24-24, 24-30 
Ohio River Basin (Nashville District) (ORN) 23-6, 
23-12, 23-18 
Ohio River Basin (Pittsburgh District) (ORP) 26-8, 
26-14, 26-19, 26-26, 26-27 
Ohio River, Locks and Dams (ORD) 22-1, 22-5, 
22-6 
Ohio River, Open Channel Work (ORD) 22-4, 22-5, 
22-6 
Oil City, Pa. (ORP) 26-22 
Okabena Creek at Worthington, Minn. (NCR) 28-14 
Okanogan and Pend Oreille Rivers (NPS) 38-25 
Okanogan River, Wash. (NPS) 38-28 
Okanogan River, Omak, Wash. (NPS) 38-28 
Okanogan River, Oroville, Wash. (NPS) 38-28 
Okatibbee Lake, Miss. (SAM) 10-12, 10-28, 
10-38 
Okeechobee Waterway, Fla. (SAJ) 9-10, 9-27, 
9-35, 9-44, 9-45, 9-47 
Oklahoma City Floodway, Okla. (SWT) 19-15, 
19-17, 19-18 
Oklawaha River, Fla. (SAJ) 9-11, 9-27, 9-35 
Olcott Harbor, N.Y. (NCB) 32-9, 32-20, 32-31 
Old Field Swamp, N.C. (SAW) 6-27 
Old Harbor, Kodiak Island, Alaska (NPA) 40-13 
Old Hickory Lock and Dam, Tenn. (ORN) 23-14 
Old Highway 82 Bridge, Columbus, Miss. (SAM) 
10-17, 10-29, 10-40 
Old River, Calif. (SPK) 35-30 
Old River, La. (MR+T) 42-6, 42-28, 42-50 
Old River, Standard Revetments (MR+T) 42-31 
Old Town Creek, Miss. (SAM) 10-42 
Oldmans Creek, N.J. (NAP) 3-21, 3-24 
Olean, N.Y. (ORP) 26-22, 26-26 
Olive Hill, Ky. (ORH) 25-22 
Olympia Harbor, Wash. (NPS) 38-5, 38-15, 38-21 
Omaha, Nebr. (MRO) 21-17, 21-19, 21-20 
Onaga Lake, Kans. (MRK) 20-17 
Onancock River, Va. (NAO) 5-23 
Oneonta, N.Y. (NAB) 4-39 
Onondaga Creek, Nedrow, N.Y. (NCB) 32-37 
Ontonagon Harbor, Mich. (NCE) 31-17, 31-40, 
31-53 
Oologah Lake, Okla. (SWL) (SWT) 18-22, 19-5, 
19-11, 19-14, 19-16, 19-17 
Oostanaula and Coosawatee River, Ga. (SAM) 
10-42 
Opekiska Lock and Dam, W. Va. (ORP) 26-25 
Open Channel Work, Ohio River (ORD) 22-4, 22-5, 
22-6 
Open River Lewiston to Johnson Bar Landing 
(NPW) 39-22 
Open River Pasco to Lewiston (NPW) 39-22 
Optima Lake, Okla. (SWT) 19-5, 19-11, 19-14, 
19-17 
Orange River, Fla. (SAJ) 9-45, 9-46 
Orchard Beach, Bronx, N.Y. (NAN) 2-39 
Oregon Slough (North Portland Harbor), Oreg. 
(NPP) 37-39 
Orleans, Ind. (ORL) 24-22 
Oro Grande Wash Channel Improvements, Calif. 
(SPL) 33-20, 33-31 
Orofino Creek and Clearwater River, Idaho (NPW) 
39-15 
Orowoc Creek, N.Y. (NAN) 2-34 
Orwell Reservoir (Otter Tail River) (NCS) 27-27 
Osage River, Kans. and Mo. (MRK) 20-19 
Osage River, Mo., Lock and Dam (MRK) 20-16 
Osawatomie, Kans. (MRK) 20-17, 20-19 
Osborne Creek, Highway 362 Bridge, Prentiss 
County, Miss. (SAM) 10-43 
Osceola Harbor, Ark. (LMM) 13-5 
Oslo, Minn. (NCS) 27-27 
Oswego Harbor, N.Y. (NCB) 32-11, 32-35, 32-39 
Ottawa, Kans. (MRK) 20-17, 20-19 
Ottawa, Ohio (NCB) 32-15 
Ottawa River Harbor, Mich. and Ohio (NCB) 
32-35 
Otter Brook Lake, N.H. (NED) 1-14, 1-28, 1-48 
Otter Creek, Vt. (NAN) 2-34 
Otter Creek and Tributaries, Shannon Hills, Ark. 
(SWL) 18-7, 18-12 
Otter Creek Park, Ky. (ORL) 24-31 
Otter Tail River, Minn. (NCS) 27-27 
Ottumwa, Iowa (NCR) 28-15 
Ouachita and Black Rivers, Ark. and La. (Felsenthal 
Canal) (LMK) 12-14 
Ouachita and Black Rivers, Ark. and La., Locks and 
Dams (LMK) 12-13 
Ouachita and Black Rivers below Camden, Ark. 
(LMK) 12-2, 12-9, 12-11 
Ouachita River and Tributaries, Ark. and La. (LMK) 
12-5, 12-12, 12-16 
Ouachita River Basin (LMK) 12-21 
Ouachita River Levees, La. (LMK) 12-5, 12-9, 
12-16 
Ouzinkie Small Boat Harbor, Alaska (NPA) 40-15 
Overton-Red River Waterway, La. (LMK) 12-14 
Owasco Inlet and Outlet, Montville and Dry Creek, 
State Ditch and Crane Brook, N.Y. (NCB) 32-37 
Owego, N.Y. (NAB) 4-39 
Owensboro, Ky. (ORL) 24-21, 24-24 
Owl's Head Harbor, Maine (NED) 1-39 
Owyhee River, Oreg. (NPW) 39-3, 39-9, 39-12 
Oxford, Md. (NAB) 4-35 
Oxford, N.Y. (NAB) 4-16, 4-26 
Oyster Channel, Va. (NAO) 5-23 
Oyster Creek, Tex. (SWG) 15-27 
Ozan Creek, Ark. (LMK) 12-16 
1-34

INDEX 
Ozark-Jeta Taylor Lock- Dam, Ark. (SWL) 18-9, 
18-13, 18-20 
Ozona, Fla. (SAJ) 9-46 
P 
Paauau Stream, Hawaii (POD) 36-11 
Paducah, Ky. (ORL) 24-20, 24-24, 24-29 
Pagan River, Va. (NAO) 5-23 
Pago Pago Airport, American Samoa (POD) 36-10 
Pago Pago to Nuuuli, American Samoa (POD) 
36-10 
Paint Creek at Chillicothe, Ohio (ORH) 25-22 
Paint Creek at Washington Court House, Ohio 
(ORH) 25-22 
Paint Creek Lake, Ohio (ORH) 25-8, 25-14, 25-18 
Paint Rock River, Ala. (ORN) 23-13, 23-19 
Painted Post, N.Y. (NAB) 4-36, 4-39 
Painted Rock Dam, Ariz. (SPL) 33-4, 33-11, 33-15 
Paintsville Lake, Ky. (ORH) 25-8, 25-14, 25-18 
Pajaro River Basin, Calif. (SPK) 35-22, 35-27 
Palm Beach, Fla. (SAJ) 9-46 
Palm Beach County, Fla., from Lake Worth Inlet to 
South Lake Worth Inlet (SAJ) 9-47 
Palm Beach County, Fla., from Martin County Line 
of Lake Worth Inlet and from South Lake Worth 
Inlet to Broward County Line (SAJ) 9-20, 9-29, 
9-40 
Palm Beach Harbor, Fla. (SAJ) 9-11, 9-27, 9-36 
Palouse River, Wash. (NPW) 39-15, 39-16 
Pamlico and Tar Rivers, N.C. (SAW) 6-7, 6-19 
Pamunkey River, Va. (NAO) 5-23 
Panacea Harbor, Fla. (SAM) 10-42, 10-45 
Panama City Harbor, Fla. (SAM) 10-9, 10-27, 
10-36, 10-45 
Pantego Creek and Cucklers Creek, N.C. (SAW) 
6-27 
Panther Creek, Curdsville, Ky. (ORL) 24-20, 24-30 
Panther Creek, W. Va. (ORH) 25-20 
Papillion Creek and Tributaries Lakes, Nebr. (MRO) 
21-5, 21-11, 21-14 
Parish Creek, Md. (NAB) 4-7, 4-23, 4-30 
Park City, Kans. (SWT) 19-17 
Park River, Hartford, Conn. (NED) 1-14, 1-28, 
1-36, 1-49 
Parker Creek, Va. (NAO) 5-7, 5-15, 5-20 
Parkersburg, W. Va. (ORH) 25-20, 25-22 
Parrotts Creek, Va. (NAO) 5-23 
Pascagoula Harbor, Miss. (SAM) 10-10, 10-28, 
10-36 
Pascagoula River, Miss. (SAM) 10-42, 10-45 
Pasquotank River, N.C. (SAW) 6-27 
Pass Christian, Miss. (SAM) 10-42, 10-45 
Pass Christian Harbor, Miss. (SAM) 10-42 
Pass Manchac, La. (LMN) 11-15 
Pass-a-Grille Pass, Fla. (SAJ) 9-45, 9-46 
Passaic River, N.J. (NAN) 2-39 
Passaic River Basin, N.J. and N.Y., Phase I (NAN) 
2-18, 2-31 
Passamaquoddy Tidal Power Project, Maine (NED) 
1-44 
Pat Mayse Lake, Tex. (SWT) 19-5, 19-11, 19-14, 
19-17 
Pataha Creek, Wash. (NPW) 39-15 
Patchogue River, Conn. (NED) 1-39 
Patman, Wright, Dam and Lake, Tex. (LMN) (SWF) 
11-17, 16-12, 16-17, 16-21 
Patoka Lake, Ind. (ORL) 24-10, 24-16, 24-27 
Patoka River at Jasper, Ind. (ORL) 24-30 
Patoka River, Winslow, Ind. (ORL) 24-30 
Patriot, Ind. (ORL) 24-22, 24-25 
Patten Bay, Maine (NED) 1-46 
Pattonsburg Lake, Mo. (MRK) 20-17 
Patuxent River, Md. (NAB) 4-34 
Pawcatuck, Conn. (NED) 1-22, 1-23, 1-43 
Pawcatuck River, R.I. and Conn. (NED) 1-39, 1-45 
Pawtucket, R.I. (NED) 1-45 
Pawtuxet Cove, R.I. (NED) 1-39 
Pawtuxet River, Cranston, R.I. (NED) 1-23 
Pawtuxet River, Warwick, R.I. (NED) 1-11, 1-27, 
1-36, 1-47, 1-48 
Pax, W. Va. (ORH) 25-22 
Payette River, Idaho (NPW) 39-15 
Payette Valley, Idaho (NPW) 39-16 
Peacock Creek, Liberty County, Ga. (SAS) 8-7, 
8-16 
Pearl River, Miss. and La. (LMK) 12-6, 12-9, 
12-12, 12-14, 12-21 
Pearl River Basin, Miss. and La. (LMK) 12-6, 
12-21 
Pearl River, Interstate 20 Bridges, Jackson, Miss. 
(SAM) 10-43 
Pearson-Skubitz Big Hill Lake, Kans. (SWT) 19-5, 
19-11, 19-14, 19-17 
Pebble Creek, Scribner, Nebr. (MRO) 21-22 
Pecan Bayou Lake, Pecan Bayou, Tex. (SWF) 16-22 
Pecatonica River at Darlington, Wis. (NCR) 28-16 
Peconic River, N.Y. (NAN) 2-34 
Pecos, Tex. (SWA) 17-7, 17-10 
Peekskill Harbor, N.Y. (NAN) 2-34 
Pekin-LaMarsh Drainage and Levee District, Ill. 
(NCR) 28-15, 28-17 
Pelican Harbor, Alaska (NPA) 40-13 
Pembina, N. Dak. (NCS) 27-27 
Pembina River, N. Dak. (NCS) 27-24 
Pembina River Lake, N. Dak. (NCS) 27-24 
Pembroke Creek, N.C. (SAW) 6-25 
Pendleton, Oreg. (NPP) 37-42 
Pendleton Levees, Oreg. (NPP) 37-42 
Peninsula Drainage District 1, Oreg. (NPP) 37-40, 
37-44, 37-48 
1-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Peninsula Drainage District 2, Oreg. (NPP) 37-40, 
37-41, 37-48 
Penny Slough, Ill. (NCR) 28-15, 28-17 
Penobscot River, Old Town, Maine (NED) 1-20, 
1-31, 1-37, 1-39 
Pensacola Bay, Fla. to Mobile Bay, Ala. (SAM) 
10-35 
Pensacola Harbor, Fla. (SAM) 10-10, 10-28, 
10-37, 10-45 
Pensacola Lake, Okla. (SWL) 18-22 
Pensaukee Harbor, Wis. (NCE) 31-17, 31-40, 
31-53 
Pentwater Harbor, Mich. (NCE) 31-17, 31-40, 
31-53, 31-63 
Peoria, Ill. (NCC) 28-15 
Peoria Lock and Dam, Ill. (NCC) 28-20 
Pepin Harbor, Wis. (NCD) 29-7 
Pepper Creek, Del. (NAP) 3-21 
Pepperell Cove, Maine (NED) 1-39, 1-45 
Perdido Pass Channel, Ala. (SAM) 10-11, 10-28, 
10-38 
Permanent International Association of Navigation 
Congresses (PIANC) 46-1 
Perquimans River, N.C. (SAW) 6-25, 6-27 
Perry County Drainage and Levee Districts Nos. 1, 
2, and 3, Mo. (LMS) 14-6, 14-10, 14-12 
Perry Lake, Kans. (MRK) 20-5, 20-11, 20-14, 
20-19 
Perry Lake Area (Road Improvements) Kans. (MRK) 
20-17 
Perth Amboy, N.J. (NAN) 2-36 
Petaluma River, Calif. (SPN) 34-6 
Peters Creek, Roanoke, Va. (SAW) 6-31 
Petersburg Harbor, Alaska (NPA) 40-13 
Petit Jean River, Ark. (SWL) 18-17 
Petite Anse, Tigre, and Carlin Bayous, La. (LMN) 
11-15 
Petoskey Harbor, Mich. (NCE) 31-18, 31-40, 
31-53 
Peyton Creek, Tex. (SWG) 15-27 
Phillippi Creek Basin, Fla. (SAJ) 9-53 
Phillips Lake, Mass. (NED) 1-43, 1-51 
Philpott Lake, Va. (SAW) 6-15, 6-16, 6-20 
Phoenix, Ariz., and Vicinity (including New River) 
(SPL) 33-4, 33-11, 33-16 
Pick-Sloan Missouri Basin Program (Kansas City 
Dist) (MRK) 20-5, 20-14 
Pick-Sloan Missouri Basin Program (Omaha Dist) 
(MRO) 21-5, 21-14, 21-19 
Pickwick Landing Lock and Dam, Tenn. (ORN) 
23-17 
Pierce, Nebr. (MRO) 21-17, 21-20 
Pig Island Gut, Maine (NED) 1-39 
Pike Island Locks and Dam, W. Va. (ORD) 22-1, 
22-7 
Pilchuck River, Wash. (NPS) 38-28 
Pilot Rock, Oreg. (NPP) 37-44 
Pinal Creek Channel Improvements (Globe), Ariz., 
(SPL) 33-19 
Pine and Mathews Canyons Dams, Nev. (SPL) 33-7, 
33-12, 33-17 
Pine Bluff, Ark. (LMK) 12-16 
Pine Creek, Angle Inlet, Minn. (NCS) 27-23 
Pine Creek Lake, Okla. (SWT) 19-6, 19-11, 19-14, 
19-18 
Pine Flat Lake and Kings River, Calif. (SPK) 35-12, 
35-24 
Pine Ford Lake, Mo. (LMS) 14-5, 14-9 
Pine Mountain Lake, Ark. (SWL) 18-17 
Pine River, Mich. (NCE) 31-61, 31-62 
Pine River Reservoir, Minn. (NCS) 27-26 
Pinellas County, Fla. (SAJ) 9-21, 9-30, 9-40 
Pineville, Ky. (ORN) 23-13, 23-19 
Pineville, La. (LMN) (LMK) 11-16, 12-18, 12-19 
Pinole Creek, Calif. (SPK) 35-31 
Pinon Canyon Dam, Trinidad, Colo. (SWA) 17-7, 
17-10 
Pioneer Lake, Kans. (MRK) 20-18 
Pipestem Lake, N. Dak. (MRO) 21-6, 21-11, 21-15 
Pithlachascotee River, Fla. (SAJ) 9-45, 9-46 
Pittsburgh, Pa. (Golden Triangle) (ORP) 26-23 
Pittsburgh, Pa. (North Side) (ORP) 26-23 
Pittsburgh, Pa. (The Strip) (ORP) 26-23 
Pittsburgh Harbor, Pa. (ORP) 26-21 
Pittsfield, Mass. (NED) 1-22, 1-50 
Placentia Canal, Ga. (SAS) 8-7 
Placer Creek, Idaho (NPS) 38-9, 38-17, 38-22 
Plainview Local Flood Protection Project (SWF) 
16-22 
Platoro Reservoir, Colo. (SWA) 17-6 
Platte River, Mo., Channel Improvement (MRK) 
20-17 
Platte River and Lost Creek, Schuyler, Nebr. (MRO) 
21-17 
Platte River and Tributaries, Nebr. (MRO) 21-17 
Platte River, Bank Protection, Louisville, Nebr. 
(MRO) 21-20 
Platte River Basin, Colo. (MRO) 21-21 
Platte River, M.U.D. Protection, Cedar Island, Nebr. 
(MRO) 21-20 
Platte River near Schuyler, Nebr. (MRO) 21-17, 
21-20 
Plattsburgh Harbor, N.Y. (NAN) 2-12, 2-24, 2-30 
Pleasant Bay, Mass. (NED) 1-39 
Pleasant Point, Perry, Maine (NED) 1-20, 1-24, 
1-31 
Pleasant River, Maine (NED) 1-39 
Pleasanton Floodway, Tex. (SWF) 16-22 
Plum Creek, Colo. (MRO) 21-20 
Plum Creek, Ky. (ORL) 24-30 
Plum Creek, Bank Stabilization, Aurora, Colo. 
(MRO) 21-20 
1-36

INDEX 
Plum Island, Mass. (NED) 1-42 
Plymouth, Pa. (NAB) 4-36, 4-39 
Plymouth Harbor, Mass. (NED) 1-39 
Poca, W. Va. (ORH) 25-21 
Pocomoke River, Md. (NAB) 4-34 
Pohoiki Bay, Hawaii (POD) 36-8 
Point Judith Pond and Harbor of Refuge, R.I. (NED) 
1-7, 1-26, 1-35, 1-45, 1-46, 1-53 
Point Lookout Harbor (Au Gres River), Mich. (NCE) 
31-18, 31-40, 31-53 
Point Place, Toledo, Ohio (NCB) 32-15, 32-22 
Point Pleasant, W. Va. (ORL) 25-20, 25-22 
Pokegama Reservoir, Minn. (NCS) 27-26 
Pollock Rip Shoals, Nantucket Sound, Mass. (NED) 
1-39 
Poloa Area, American Samoa (POD) 36-10 
Polson Bay, Flathead Lake, Mont. (NPS) 38-25 
Pomeroy, Ohio (ORL) 25-21 
Pomme De Terre Lake, Mo. (MRK) 20-5, 20-11, 
20-15, 20-19 
Pomona Lake, Kans. (MRK) 20-6, 20-11, 20-15, 
20-19 
Ponce, P.R. (SAJ) 9-41 
Ponce De Leon Inlet, Fla. (SAJ) 9-12, 9-28, 9-36 
Ponce Harbor, P.R. (SAJ) 9-12, 9-28, 9-36 
Pontiac Diversion, R.I. (NED) 1-45 
Pool, Joe, Lake (Lakeview Lake), Tex. (SWF) 16-7, 
16-16,.16-20 
Port Alexander, Alaska (NPA) 40-13, 40-14, 
40-15 
Port Allen Harbor, Hawaii (POD) 36-8 
Port Angeles Harbor, Wash. (NPS) 38-25, 38-30 
Port Arthur and Vicinity, Tex. Hurricane-Flood 
Protection (SWG) 15-10, 15-15, 15-25 
Port Austin Harbor, Mich. (NCE) 31-18, 31-41, 
31-53 
Port Bay, N.Y. (NCB) 32-35 
Port Chester Harbor, N.Y. (NAN) 2-34 
Port Clinton Harbor, Ohio (NCB) 32-11, 32-35 
Port Dickinson, N.Y. (NAB) 4-39 
Port Everglades Harbor, Fla. (SAJ) 9-13, 9-28, 
9-36 
Port 5 Facility, Bridgeport, Conn. (NED) 1-18, 
1-24, 1-30, 1-36 
Port Gamble Harbor, Wash. (NPS) 38-25, 38-30, 
38-31 
Port Henry Harbor, N.Y. (NAN) 2-34 
Port Hueneme, Calif. (SPL) 33-18 
Port Jefferson Harbor, N.Y. (NAN) 2-34 
Port Jervis, N.Y. (NAP) 3-13 
Port Lions Small Boat Harbor, Alaska (NPA) 40-5, 
40-9, 40-12, 40-15 
Port of Kalama, Wash. (NPP) 37-40 
Port Ontario Harbor, N.Y. (NCB) 32-9, 32-20 
Port Orchard Bay, Wash. (NPS) 38-25 
Port Orford, Oreg. (NPP) 37-7, 37-25, 37-34 
Port Royal Harbor, S.C. (SAN) 7-6, 7-10, 7-13 
Port San Luis, Calif. (SPL) 33-18 
Port Sanilac Harbor, Mich. (NCE) 31-19, 31-41, 
31-53 
Port St. Joe Harbor, Fla. (SAM) 10-42, 10-45 
Port Townsend, Wash. (NPS) 38-25, 38-31 
Port Washington Harbor, Wis. (NCE) 31-19, 31-41, 
31-53 
Port Wing Harbor, Wis. (NCE) 31-19, 31-41, 
31-53 
Portage, Pa. (ORP) 26-22 
Portage Lake Harbor, Mich. (NCE) 31-18, 31-41, 
31-53 
Portchester Harbor, N.Y. (NAN) 2-38 
Porter Bayou, Miss. (LMK) 12-6, 12-9, 12-12 
Portland, Ind. (ORL) 24-20, 24-30 
Portland, Ohio (ORH) 25-21 
Portland Harbor, Maine (NED) 1-39 
Portneuf River and Marsh Creek, Idaho (NPW) 
39-15, 39-16 
Portsmouth Harbor, Va. Channel to Nansemond 
Ordnance Depot (NAO) 5-23 
Portsmouth Harbor and Piscataqua River, Maine and 
N.H. (NED) 1-39 
Portsmouth-New Boston, Ohio (ORH) 25-20, 
25-22 
Portugues and Bucana Rivers, P.R. (SAJ) 9-23, 
9-30, 9-41 
Portville, N.Y. (ORP) 26-22, 26-26 
Posten Bayou, Ark. and La. (LMN) (LMK) 11-16, 
12-17, 12-19 
Poteau River Navigation, Ark. and Okla. (SWT) 
19-15 
Poteet Floodway, Tex. (SWF) 16-22 
Potomac and Anacostia Rivers, D.C., Collection and 
Removal of Drift (NAB) 4-7, 4-23, 4-30 
Potomac River and Tributaries at and below 
Washington, D.C., Elimination of Waterchestnut 
(NAB) 4-34 
Potomac River Aquatic Plant Control, Md., Va., D.C. 
(NAB) 4-8, 4-23, 4-30 
Potomac River at Alexandria, Va. (NAB) 4-34 
Potomac River at Lower Cedar Point, Md. (NAB) 
4-34 
Potomac River at Mount Vernon, Va. (NAB) 4-34 
Potomac River below Washington, D.C. (NAB) 4-34 
Potomac River North Side of Washington Channel, 
D.C. (NAB) 4-34 
Potowomut River, R.I. (NED) 1-39 
Pottstown, Pa. (NAP) 3-23 
Poverty Point, La. (LMN) 12-6, 12-10, 12-12 
Powell County High School, Mont. (NPS) 38-28 
Powhatan Point, Ohio (ORP) 26-22, 26-26 
Prado Dam, Calif. (SPL) 33-24 
Prairie Du Chien, Wis. (NCS) 27-11, 27-20 
Prairie Du Chien Harbor, Wis. (NCD) 29-7 
1-37

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Prairie du Pont Levee and Sanitary District, Ill. 
(LMS) 14-15 
Prairie du Rocher and Vicinity, Ill. (LMS) 14-15 
Prattville, Ala. (SAM) 10-43 
Pre-Authorization Studies for Beach Erosion 
Control Activities 
Baltimore, Md., District (NAB) 4-11 
Buffalo, N.Y., District (NCB) 32-14 
SChicago, Ill., District (NCC) 30-6 
Detroit, Mich., District (NCE) 31-26 
Galveston, Tex., District (SWG) 15-8 
Jacksonville, Fla., District (SAJ) 9-21 
Mobile, Ala., District (SAM) 10-12, 10-44 
New England Division (NED) 1-46 
New York, N.Y., District (NAN) 2-36 
Norfolk, Va., District (NAO) 5-10 
Pacific Ocean Division (POD) 36-3 
Philadelphia, Pa., District (NAP) 3-10 
Savannah, Ga., District (SAS) 8-6 
Seattle, Wash., District (NPS) 38-8 
Pre-Authorization Studies for Flood Control 
Activities 
Alaska District (NPA) 40-6 
Albuquerque, N. Mex., District (SWA) 17-7 
Baltimore, Md., District (NAB) 4-19 
Buffalo, N.Y., District (NCB) 32-38 
Charleston, S.C., District (SAN) 7-16 
Chicago, Ill., District (NCC) 30-7 
Detroit, Mich., District (NCR) 31-28 
Fort Worth, Tex., District (SWF) 16-12, 16-23 
Galveston, Tex., District (SWG) 15-12 
Huntington, W. Va., District (ORH) 25-11 
Jacksonville, Fla., District (SAJ) 9-53 
Kansas City, Mo., District (MRK) 20-7, 20-21 
Little Rock, Ark., District (SWL) 18-5, 18-25 
Los Angeles, Calif., District (SPL) 33-25 
Louisville, Ky., District (ORL) 24-13, 24-31 
Memphis, Tenn., District (LMM) 13-3 
Mobile, Ala., District (SAM) 10-44 
Nashville, Tenn., District (ORN) 23-6, 23-19 
New England Division (NED) 1-47 
New Orleans, La., District (LMN) 11-9 
New York, N.Y., District (NAN) 2-37 
Norfolk, Va., District (NAO) 5-12 
Omaha, Nebr., District (NRO) 21-6, 21-22 
Pacific Ocean Division (POD) 36-4 
Philadelphia, Pa., District (NAP) 3-12 
Pittsburgh, Pa., District (ORP) 26-29 
Portland, Oreg., District (NPP) 37-46 
Rock Island, Ill., District (NCR) 28-18 
Sacramento, Calif., District (SPK) 35-19 
San Francisco, Calif., District (SPN) 34-3 
Savannah, Ga., District (SAS) 8-7 - 
Seattle, Wash., District (NPS) 38-32 
St. Louis, Mo., District (LMS) 14-8 
St. Paul, Minn., District (NCS) 27-28 
Tulsa, Okla., District (SWT) 19-7, 19-19 
Vicksburg, Miss., District (LMK) 12-8 
Walla Walla, Wash., District (NPW) 39-2 
Wilmington, N.C., District (SAW) 6-31 
Pre-Authorization Studies for Navigation Activities 
Alaska District (NPA) 40-15 
Baltimore, Md., District (NAB) 4-11 
Buffalo, N.Y., District (NCB) 32-11, 32-36 
Charleston, S.C., District (SAN) 7-15 
Chicago, Ill., District (NCC) 30-6 
Detroit, Mich., District (NCE) 31-25 
Galveston, Tex., District (SWG) 15-9 
Jacksonville, Fla., District (SAJ) 9-17 
Little Rock, Ark., District (SWL) 18-4 
Memphis, Tenn., District (LMM) 13-1 
Mobile, Ala., District (SAM) 10-12, 10-44 
Nashville, Tenn., District (ORN) 23-4 
New England Division (NED) 1-46 
New Orleans, La., District (LMN) 11-5 
New York, N.Y., District (NAN) 2-37 
Norfolk, Va., District (NAO) 5-9 
Pacific Ocean Division (POD)'36-3 
Philadelphia, Pa., District (NAP) 3-8 
Portland, Oreg., District (NPP) 37-45 
San Francisco, Calif., District (SPN) 34-3 
Savannah, Ga., District (SAS) 8-6 
Seattle, Wash., District (NPS) 38-4 
St. Louis, Mo., District (LMS) 14-7 
Vicksburg, Miss., District (LMK) 12-3 
Walla Walla, Wash., District (NPW) 39-2 
Wilmington, N.C., District (SAW) 6-29 
Prescott Area, Oreg. (NPP) 37-44 
Presque Isle Harbor, Mich. (NCE) 31-61, 31-62 
Presque Isle Peninsula, Erie, Pa. (NCB) 32-13, 
32-21, 32-33 
Prestile Stream, Blaine, Maine (NED) 1-43 
Preston Drainage and Levee District, Ill. (LMS) 
14-15 
Prestonburg, Ky. (ORH) 25-22 
Prestonville, Ky. (ORL) 24-22, 24-25 
Priest, J. Percy, Dam and Reservoir, Tenn. (ORN) 
23-7, 23-9, 23-18 
Priest Rapids Dam, Wash. (NPS) 38-30 
Princeton, W. Va. (ORH) 25-20, 25-22 
Prineville Area, Oreg. (NPP) 37-44 
Proctor, Otter Creek Basin, Vt. (NAN) 2-38 
Proctor, W. Va. (ORP) 26-22, 26-26 
Proctor Lake, Tex. (SWF) 16-9, 16-16, 16-20 
Proctorville, Ohio (ORH) 25-20 
Prompton Lake, Pa. (NAP) 3-13, 3-17 
Prospect Beach, West Haven, Conn. (NED) 1-42, 
1-46 
Providence River and Harbor, R.I. (NED) 1-39 
Provincetown Beach (Herring Cove), Mass. (NED) 
1-45 
Provincetown Harbor, Mass. (NED) 1-39, 1--45 
1-38

INDEX 
Pudding River, Oreg. (NPP) 37-44 
Pueblo Arkansas River, Colo. (Floodway Levee 
Extension) (SWA) 17-7, 17-10 
Puget Sound and Its Tributary Waters, Wash. (NPS) 
38-5, 38-15, 38-21 
Pullman, Palouse, Wash. (NPW) 39-15 
Pultneyville Harbor, N.Y. (NCB) 32-35 
Pumpkinvine Creek, Emerson, Ga. (SAM) 10-43 
Pungo Creek, N.C. (SAW) 6-27 
Pungo River, N.C. (SAW) 6-27 
Punta Salinas, P.R. (SAJ) 9-47 
Punxsutawney, Pa. (ORP) 26-5, 26-13, 26-18, 
26-26 
Punxsutawney, Pa. (Allegheny River Basin) (ORP) 
26-26 
Put In Bay, Ohio (NCB) 32-35 
Pysht River, Wash. (NPS) 38-28 
Q 
Quail Wash Levee, Joshua Tree, Calif. (SPL) 33-20 
Queens Creek, Va. (NAO) 5-24 
Queenstown Harbor, Md. (NAB) 4-34 
Queets River, Wash. (NPS) 38-28 
Quillayute River, Wash. (NPS) 38-5, 38-15, 38-21, 
38-28 
Quinalt River, Wash. (NPS) 38-28 
Quinby Creek, Va. (NAO) 5-7, 5-16, 5-20 
Quincy, Ill., Harbor Access Channel (NCR) 28-13 
Quincy, Mass. (NED) 1-22 
Quincy Harbor, Ill. (NCD) 29-8 
Quincy Shore Beach, Quincy, Mass. (NED) 1-42 
Quinnipiac River, North Haven, Conn. (NED) 1-23 
R 
R. D. Bailey Lake, W. Va. (ORH) 25-9, 25-14, 
25-18 
Raccoon Creek, N.J. (NAP) 3-21 
Raccoon Levee, Ind. (ORL) 24-22, 24-25 
Racine, Ohio (ORH) 25-21 
Racine Harbor, Wis. (NCE) 31-19, 31-41, 31-54 
Racine Locks and Dam, Ohio (ORD) 22-3, 22-6, 
22-8 
Rahway, N.J. (NAN) 2-36 
Rahway, South Branch, N.J. (NAN) 2-36 
Rahway River, N.J. (NAN) 2-38 
Rainey, Henry T., Dam, Ill. (NCD) 29-6 
Rainier Drainage District, Oreg. (NPP) 37-40, 
37-41, 37-48 
Ramapo River, Monroe, N.Y. (NAN) 2-39 
Rancocas Creek at Mt. Holly, N.J. (NAP) 3-13 
Rancocas River, N.J. (NAP) 3-24 
Randleman Lake, N.C. (SAW) 6-10, 6-20 
Rapid City, Cedar Canyon Dam, S. Dak. (MRO) 
21-20 
Rapid Creek, Idaho (NPW) 39-15 
Rapid Creek, Rapid City, S. Dak. (MRO) 21-17, 
21-20 
Rapide Croche Lock and Dam, Wis. (NCE) 31-60 
Rappahannock River, Va. (NAO) 5-24 
Rappahannock River at Bowlers Wharf, Va. (NAO) 
5-24 
Rappahannock Shoal Channel, Va. (NAO) 5-2, 
5-18 
Raritan Bay and Sandy Hook Bay, N.J. (NAN) 2-36 
Raritan River, N.J. (NAN) 2-12, 2-24, 2-30, 2-33, 
2-38 
Raritan River to Arthur Kill Cutoff Channel, N.J. 
(NAN) 2-33, 2-34 
Rathbun Lake, Iowa (MRK) 20-6, 20-12, 20-17 
Rathbun Lake Fish Hatchery (MRK) 20-17 
Ravenswood, W. Va. (ORH) 25-20 
Ray Roberts Lake, Tex. (SWF) 16-10, 16-16, 
16-20 
Rayburn, Sam, Dam and Reservoir, Tex. (SWF) 
16-13, 16-17, 16-20 
Raystown Lake, Pa. (NAB) 4-12, 4-24, 4-32 
Red Brook Harbor, Bourne, Mass. (NED) 1-39 
Red Creek, N.Y. (NCB) 32-37 
Red Lake and Red Lake River, Minn. (NCS) 27-23 
Red Lake Falls, Minn. (NCS) 27-27 
Red Lake River, Minn., including Clearwater River, 
Minn. (NCS) 27-11, 27-20 
Red Lake River at Huot, Minn. (NCS) 27-24 
Red Lake River at Red Lake Falls, Minn. (NCS) 
27-24 
Red River, Tenn. (ORN) 23-13 
Red River at East Grand Forks, Minn. (NCS) 27-27 
Red River at Fargo, N. Dak. (NCS) 27-27 
Red River at Grand Forks, N. Dak. (NCS) 27-27 
Red River Backwater Levees (MR+T) 42-46, 
42-49, 42-52 
Red River below Denison Dam including Little River 
Basin, Okla. and Ark. (SWL) 18-15 
Red River below Denison Dam, Levees and Bank 
Stabilization (LMK) (SWT) 12-7, 12-10, 12-12, 
12-17, 19-15 
Red River below Denison Dam (Vicksburg District) 
(LMK) 12-7 
Red River below Fulton, Ark. (LMK) 12-14 
Red River Emergency Bank Protection (LMK) 12-2, 
12-9, 12-11 
Red River from Fulton, Ark., to Mouth of Washita 
River (SWT) 19-15 
Red River in Vicinity of Shreveport, La. (LMN) 
(LMK) 11-16, 12-18, 12-19 
Red River Lake, Ky. (ORL) 24-21 
Red River of the North, Minn. and N. Dak. (NCS) 
27-23 
1-39

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Red River of the North, Argusville, N. Dak. (NCS) 
27-12, 27-20 
Red River of the North at Breckenridge, Minn. 
(NCS) 27-24 
Red River of the North at Oslo, Minn. (NCS) 27-24 
Red River of the North at Pembina, N. Dak. (NCS) 
27-24 
Red River of the North Drainage Basin, Minn., S. 
Dak. and N. Dak. (NCS) 27-12, 27-21, 27-27 
Red River of the North, Halstad, Minn. (NCS) 
27-13, 27-21 
Red River Parish, La. (LMN) (LMK) 11-16, 12-18, 
12-19 
Red River Standard Revetments (MR+T) 42-37 
Red River Waterway, La., Ark., Okla., and Tex. 
(LMK) 12-14 
Red River Waterway-Mississippi River to 
Shreveport, La. (LMK) 12-2, 12-9, 12-11 
Red River Waterway, Shreveport, La., to 
Daingerfield, Tex. (LMK) 12-14 
Red River Waterway-Shreveport, La., to Index, Ark. 
(LMK) 12-7, 12-10, 12-12 
Red Rock Dam and Lake Red Rock, Iowa (NCR) 
28-5, 28-9, 28-12 
Red Run Drain-Lower Clinton River, Mich. (NCE) 
31-63 
Red Wing Harbor, Minn. (NCD) 29-7 
Redbank and Fancher Creeks, Calif. (SPK) 35-21 
Redbank Creek Lake, Pa. (ORP) 26-23 
Reddies River Lake, N.C. (SAN) (SAW) 6-27, 
7-16 
Redmond, John, Dam and Reservoir, Kans. (SWT) 
19-5, 19-10, 19-14, 19-17 
Redondo Beach Harbor (King Harbor), Calif. (SPL) 
33-18 
Redwater River and Hay Creek, S.D. (MRO) 21-18 
Redwood City Harbor, Calif. (SPN) 34-6 
Redwood Creek, Humboldt County, Calif. (SPK) 
35-31 
Redwood River at Marshall, Minn. (NCS) 27-13, 
27-21 
Redwood River below Marshall, Minn. (NCS) 27-24 
Reeds Bay Small Boat Harbor, Hawaii (POD) 36-8 
Reedsport Levees, Oreg. (NPP) 37-42 
Reedy River, S.C. (SAN) 7-16 
Reelfoot Lake-Lake No. 9, Tenn. and Ky. (MR+T) 
42-10, 42-18, 42-28 
Reese River, Battle Mountain, Nev. (SPK) 35-31 
Reevesville, Ill. (ORL) 24-20, 24-24, 24-29 
Regulation of Hydraulic Mining and Preparation of 
Plans {CDC) 44-1, 44-5, 44-6 
Regulatory, Sunken Vessel Removal and National 
Emergency Preparedness Activities 48-1 
Rehoboth Beach to Indian River Inlet, Del. (NAP) 
3-23 
Removal of Aquatic Growth, La. (LMN) 11-15 
Removal of Aquatic Growth from Navigable Waters 
in the State of Florida (SAJ) 9-13, 9-28, 9-37, 
9-45 
Removal of Sunken Vessels 48-1 
Removing Snags and Wrecks from Mississippi River 
below Mouth of Missouri River and from Old and 
Atchafalaya Rivers (LMK) (LMM) 12-14, 13-5 
Removing Water Hyacinths, Mobile District (SAM) 
10-42 
Rend Lake, Ill. (LMS) 14-7, 14-10, 14-12 
Reno Beach-Howard Farms Area, Ohio (NCB) 
32-15, 32-37 
Republican River, Neb. and Kan. (MRK) 20-19 
Reservoirs at Headwaters of Mississippi River, Minn. 
(NCS) 27-2, 27-19, 27-22, 27-26 
Restoration of Indian Fishing Grounds, B44neville, 
Oreg. (NPP) 37-44 
Revere Beach, Mass. (NED) 1-10, 1-27, 1-35 
Reynoldsville, Pa. (ORP) 26-22 
Rheem Creek, Calif. (SPK) 35-31 
Rhodes Point to Tylerton, Md. (NAB) 4-8, 4-23, 
4-30 
Rice Creek, Fla. (SAJ) 9-46 
Richard B. Russell Dam and Lake, Ga. and S.C. 
(Formerly Trotters Shoals Lake) (SAS) 8-9, 
8-12, 8-15 
Richland Creek, Ill. (LMS) 14-15 
Richland Lake, Mo. (MRK) 20-18 
Richmond, Va. (NAO) 5-10, 5-16, 5-21 
Richmond Filtration Plant, Va. (NAO) 5-24 
Richmond Harbor, Calif. (SPN) 34-2, 34-6 
Richmond Harbor, Maine (NED) 1-39 
Richmond's Island Harbor, Maine (NED) 1-39 
Richwood and Fenwick, W. Va. (ORH) 25-22 
Ridgecrest, Calif. (SPL) 33-20 
Ridgeley, W.Va. (NAB) 4-39 
Ridgway, Pa. (Allegheny River Basin) (ORP) 26-26 
Ridgway, Pa. (Elk Creek) (ORP) 26-22 
Ridgway and Vicinity, Pa. (On Clarion River) (ORP) 
26-22 
Right and Left Forks of Beaver Creek, Ky. (ORH) 
25-22 
Rio Grande Basin, N. Mex. (SWA) 17-3, 17-9, 
17-10 
Rio Grande Floodway, N. Mex. (SWA) 17-4, 17-9, 
17-10 
Ripley, Ohio (ORH) 25-21 
Ripley, W. Va. (ORH) 25-22 
Ririe Lake, Idaho (NPW) 39-15 
Rising Sun, Ind. (ORL) 24-22, 24-25 
River Rouge, Mich. (NCE) 31-63 
Riverdale, Mass. (NED) 1-43, 1-47, 1-49 
Riverland Levee District, Mo. (LMS) 14-15 
Riverside Area, Pasco, Wash. (NPW) 39-15 
Riverside levees, Santa Ana River Basin, Calif. (SPL) 
33-24 
1-40

INDEX 
Riverview, W. Va. (ORH) 25-21 
Roanoak Lake, Tex. (SWF) 16-22 
Roanoke River, N.C. (SAW) 6-25 
Roanoke River Basin, Va. and N.C. (SAW) 6-14, 
6-30 
Roaring River, N.C. (SAN) 7-16 
Roaring River Lake, N.C. (SAW) 6-27 
Robert F. Henry Lock and Dam, Ala. (SAM) 10-20, 
10-30 
Robert S. Kerr Lock and Dam, Okla. (SWL) (SWT) 
18-20, 19-8, 19-13, 19-15, 19-16 
Robert S. Kerr Marine Terminal, Sallisaw, Okla. 
(SWT) 19-16 
Roberts, Ray, Lake, Tex. (SWF) 16-10, 16-16, 
16-20 
Rochester and McCleary's Bluff Levee, Ill. (ORL) 
24-20, 24-24, 24-29 
Rochester, Minn. (NCS) 27-13, 27-21 
Rochester, Pa. (ORP) 26-22, 26-26 
Rochester Harbor, N.Y. (NCB) 32-10, 32-20, 
32-31 
Rochester Lake, Iowa (NCR) 28-16 
Rock Creek, Mont. (NPS) 38-28 
Rock Hall Harbor, Md. (NAB) 4-34 
Rock Island, Ill. (NCR) 28-15, 28-17 
Rock Island District (NCD) 29-2, 29-3, 29-4, 
29-7 
Rock Island Harbor, Ill. (NCD) 29-7 
Rock River Agricultural Levees, Ill. (NCR) 28-15 
Rockfish Creek, N.C. (SAW) 6-28 
Rockford, Ill. (NCR) 28-5, 28-9, 28-12 
Rockingham, Vt. (NED) 1-22 
Rockland Harbor, Maine (NED) 1-39 
Rockland Lake, Tex. (SWF) 16-13, 16-16, 16-20 
Rockport, Ind. (ORL) 24-22, 24-25 
Rockport and Old Harbors, Mass. 1-8, 1-26, 1-46 
Rockport Harbor, Maine (NED) 1-39, 1-53 
Rockport Harbor, Mass. (NED) 1-35, 1-39 
Rocky Ford Drainage and Levee District, Ill. (NCR) 
28-15 
Rocky Fork, Ohio (ORH) 25-21 
Rocky Pass, Alaska (NPA) 40-13 
Rocky River Harbor, Ohio (NCB) 32-10, 32-21, 
32-32 
Rodeo Creek, Calif. (SPK) 35-31 
Rogers City Harbor, Mich. (NCE) 31-63 
Rogue River, Oreg. (NPP) 37-42 
Rogue River Harbor at Gold Beach, Oreg. (NPP) 
37-8, 37-25, 37-34 
Roland Drainage District, Arkansas River, Ark. 
(SWL) 18-17 
Rolling Fork Road, Sevier County, Ark. (SWL) 
18-17 
Rollinson Channel, N.C. (SAW) 6-8, 6-19, 6-29 
Rome, Ga. (SAM) 10-43 
Rome, Ind. (ORL) 24-22, 24-25 
Rome Mohawk River, N.Y. (NAN) 2-38 
Rondout Harbor, N.Y. (NAN) 2-13, 2-25, 2-30 
Root Creek, Bolivar, N.Y. (ORP) 26-5, 26-13 
Rose Creek Channel Improvements, San Diego, 
Calif. (SPL) 33-20, 33-24 
Roseau River, Minn. (NCS) 27-14, 27-21 
Rosedale Harbor, Miss. (LMK) 12-14 
Rosendale, N.Y. (NAN) 2-36 
Roseville, Ohio (ORH) 25-9, 25-15, 25-18, 25-22 
Rosiclare, Ill. (ORL) 24-20, 24-29 
Rossview Reservoir, Ohio River Basin, Tenn. and Ky. 
(ORN) 23-13, 23-18 
Rota Harbor, Northern Marianas (POD) 36-8 
Rouge River, Mich. (NCE) 31-20, 31-42, 31-54, 
31-63 
Rough River, Ky. (ORL) 24-19, 24-24, 24-27, 
24-30 
Rough River Lake and Channel Improvements, Ky. 
(ORL) 24-10, 24-16 
Rouses Point, Lake Champlain, N.Y. (NAN) 2-34 
Rouseville, Pa. (ORP) 26-22 
Rowlesburg Lake, W. Va. (ORP) 26-22 
Royal River, Maine (NED) 1-8, 1-27, 1-35 
Ruby River, Wheatly Bridge, near Twin Bridges, 
Mont. (MRO) 21-19 
Rudee Inlet, Norfolk, Va., District (NAO) 5-25 
Ruffy Brook, Minn. (NCS) 27-25 
Rufus Woods Lake, Wash. (NPS) 38-10, 38-16, 
38-22 
Rush River, N. Dak. (NCS) 27-27 
Rushford, Minn. (NCS) 27-24 
Russell, Ky. (ORH) 25-20, 25-22 
Russell and Allison Levee, Ill. (ORL) 24-20, 24-24 
Russell, Richard B., Dam and Lake, Ga. and S.C. 
(SAS) 8-9, 8-12, 8-15 
Russian River Basin, Calif. (SPK) 35-14, 35-24, 
35-28, 35-34, 35-35 
Rutland, Otter Creek, Vt. (NAN) 2-36 
Rutledge Hollow Creek Channel Improvement, 
Poteet, Tex. (SWF) 16-22 
Rye Creek, Mont. (NPS) 38-28 
Rye Harbor, N.H. (NED) 1-39 
S 
Sabine-Neches Waterway, Tex. (SWG) 15-7, 
15-14, 15-22, 15-28, 15-30, 15-35 
Sabine River and Tributaries, Tex. (Echo to Morgan 
Bluff) (SWG) 15-27 
Sabula, Iowa (NCR) 28-15, 28-17 
Sackets Harbor, N.Y. (NCB) 32-35, 32-39 
Saco, Mont. (MRO) 21-17, 21-19 
Saco River, Maine (NED) 1-9, 1-27, 1-35, 1-45, 
1-53 
Sacramento River, Calif. (CDC) 44-3, 44-5, 44-6, 
44-7 
1-41

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Sacramento River, Calif. (SPK) 35-2, 35-23, 
35-28, 35-33 
Sacramento River and Tributaries, Calif. (CDC) 
44-2, 44-5 
Sacramento River and Tributaries, Calif., from 
Collinsville to Shasta Dam (SPK) 35-15, 35-25, 
35-28, 35-35, 35-36 
Sacramento River Deep Water Ship Channel, Calif. 
(SPK) 35-2, 35-23 
Sacred Heart Hospital, Yankton, S. Dak. (MRO) 
21-17, 21-20 
Sag Harbor, N.Y. (NAN) 2-34 
Saginaw River, Mich. (NCE) 31-20, 31-26, 31-42, 
31-49, 31-54, 31-56 
Saint John River Basin, Maine (NED) 1-20 
Saipan Small Boat Harbor, Northern Marianas 
(POD) 36-8 
Sakonnet Harbor, R.I. (NED) 1-39, 1-45 
Sakonnet River, R.I. (NED) 1-39 
Salamanca, N.Y. (ORP) 26-22 
Salamonie Lake, Ind. (ORL) 24-11, 24-16 
Salem Church Lake, Va. (NAO) 5-24 
Salem Harbor, Mass. (NED) 1-39 
Salem River, N.J. (NAP) 3-14, 3-21 
Salina, Kans. (MRK) 20-17, 20-19 
Salinas River, Calif. (SPK) 35-31 
Saline Point, La. (LMN) (LMK) 11-16, 12-18, 
12-19 
Saline River, Ark. (LMK) 12-14 
Saline River and Tributaries, Ill. (ORL) 24-20, 
24-30 
Salisbury, Conn. (NED) 1-22, 1-50 
Salkahatchie River, S.C. (SAN) 7-15 
Salmon Creek at Oakridge, Oreg. (NPP) 37-42 
Salmon Creek near Vancouver, Wash. (NPP) 37-42 
Salmon River, Alaska (N A) 40-14 
Salmon River, Idaho (NPW) 39-17 
Salmon River, Oreg. (NPP) 37-39 
Salmon River, Colchester, Conn. (NED) 1-43, 1-49 
Salt Creek, Ohio (ORH) 25-20 
Salt Creek and Tributaries, Nebr. (MRO) 21-6, 
21-11, 21-15 
Salt Lake City, Jordan River, Utah (SPK) 35-31 
Saluda River, S.C. (SAN) 7-16 
Salyersville, Ky. (ORL) 24-21 
Sam Rayburn Dam and Reservoir, Tex. (SWF) 
16-13, 16-17, 16-20 
Sammamish River, Wash. (NAS) 38-28 
San Antonio Channel Improvement, Tex. (SWF) 
16-10, 16-17, 16-20 
San Antonio and Chino Creeks Channel, Calif. (SPL) 
33-24 
San Antonio Dam, Calif. (SPL) 33-24 
San Antonio Floodway, Tex. (SWF) 16-22 
San Diego Creek, Alice, Tex. (SWG) 15-27 
San Diego Harbor, Calif. (SPL) 33-18 
San Diego River and Mission Bay, Calif. (SPL) 
33-18, 33-22 
San Diego River (Mission Valley), Calif. (SPL) 
33-20, 33-24 
San Diego (Sunset Cliffs), Calif. (SPL) 33-19 
San Francisco Bay and Delta Model, Calif. (SPN) 
34-2, 34-6 
San Francisco Bay to Stockton, Calif. (John F. 
Baldwin and Stockton Ship Channels) (SPK) 
(SPN) 34-2, 34-6, 35-3, 35-23 
San Francisco Harbor, Calif. (SPN) 34-6, 34-8 
San Francisco Harbor and Bay (Removal of Drift), 
Calif. (SPN) 34-6 
San Francisco Marina (Gas House Cove), Calif. 
(SPN) 34-8 
San Gabriel River, Tex. (SWF) 16-10, 16-17, 
16-20 
San Gabriel River to Newport Bay (Surfside-Sunset 
and Newport Beach), Calif. (SPL) 33-19 
San Jacinto River Levee and Bautista Creek 
Channel, Calif. (SPL) 33-24 
San Joaquin River, Calif. (SPK) 35-4, 35-23, 
35-33, 35-34 
San Juan, P.R. (SAJ) 9-47 
San Juan Dam, Calif. (SPL) 33-24 
San Juan Harbor, P.R. (SAJ) 9-15, 9-28, 9-37 
San Leandro Creek, Calif. (SPK) 35-31 
San Leandro Marina, Calif. (SPN) 34-6 
San Leandro Marina (Breakwater), Calif. (SPN) 
34-8 
San Lorenzo Creek, Calif. (SPK) (SPN) 34-9, 35-31 
San Lorenzo River, Calif. (SPK) 35-31 
San Luis Rey River, Calif. (SPL) 33-20 
San Pablo Bay and Mare Island Strait, Calif. (SPN) 
34-6, 34-9 
San Rafael Creek, Calif. (SPN) 34-6 
Sand Creek Channel Improvement, Kans. (SWT) 
19-15, 19-17, 19-18 
Sand Hill Cove Beach, R.I. (NED) 1-42 
Sand Hill River, Minn. (NCS) 27-27 
Sand Island, Hawaii (POD) 36-10 
Sand Lake, Okla. (SWT) 19-15 
Sand Point, Alaska (NPA) 40-16 
Sandburg Creek, Ellenville, N.Y. (NAN) 2-40 
Sandburg Creek, Spring Glen, N.Y. (NAN) 2-36 
Sandusky Harbor, Ohio (NCB) 32-10, 32-21, 
32-32 
Sandusky River, Ohio (NCB) 32-35 
Sandy Bay, Cape Ann, Mass. (NED) 1-39, 1-45 
Sandy Bay (Harbor of Refuge), Cape Ann, Mass. 
(NED) 1-39 
Sandy Creek, Jackson, Tenn. (LMM) 13-6 
Sandy Drainage District, Oreg. (NPP) 37-41, 37-48 
Sandy Hook Bay, N.J. (NAN) 2-34 
Sandy Hook Bay at Leonardo, N.J. (NAN) 2-33, 
2-34 
1-42

INDEX 
Sandy Lake Reservoir, Minn. (NCS) 27-26 
Sandy River and Sleepy Lake, Oreg. (NPP) 37-42 
Sangamon River (Mouth), Ill. (NCR) 28-15 
Sanitary District of Beardstown, Ill. (NCR) 28-17 
Sans Bois Navigation Channel, Okla. (SWT) 19-16 
Santa Ana River Basin (and Orange County), Calif. 
(SPL) 33-7, 33-12, 33-17, 33-20, 33-24 
Santa Ana River Basin, Calif.: Devil, East Twin, and 
Warm Creeks Channel Improvements (SPL) 
33-20 
Santa Ana River Main Stem, Calif. (SPL) 33-8 
Santa Barbara Harbor, Calif. (SPL) 33-2, 33-10, 
33-15 
Santa Clara River Levee Improvement, Calif. (SPL) 
33-20 
Santa Cruz County, Calif. (SPN) 34-8 
Santa Cruz Harbor, Calif. (SPN) 34-3, 34-7 
Santa Fe River and Arroyo Mascaras, N. Mex. 
(SWA) 17-7, 17-10 
Santa Maria Valley Levees, Calif. (SPL) 33-20 
Santa Paula Creek Channel and Debris Basins 
(including Mud Creek), Calif. (SPL) 33-20 
Santa Rosa Dam and Lake, N. Mex. (SWA) 17-5, 
17-8 
Santa Rosa Wash (at Momolikot Dam and Lake St. 
Clair), Ariz. (SPL) 33-19 
Santee River, N.C. and S.C. (SAN) 7-15 
Sapelo Harbor, Ga. (SAS) 8-16 
Sardis, Ohio (ORH) 25-21 
Sardis Lake, Miss. (MR+T) 42-20, 42-59 
Sardis Lake, Okla. (SWT) 19-6, 19-11, 19-14, 
19-18 
Sasanoa River, Maine (NED) 1-40 
Sasco Hill Beach, Fairfield, Conn. (NED) 1-42 
Satilla River, Ga. (SAS) 8-16 
Saugatuck Harbor and Kalamazoo River, Mich. 
(NCE) 31-23, 31-43, 31-55 
Saugerties Harbor, N.Y. (NAN) 2-34 
Sauk River, Wash. (NPS) 38-28 
Sauquoit Creek, Whitesboro, N.Y. (NAN) 2-39 
Sauvie Island Drainage District, Oreg. (NPP) 37-40, 
37-41, 37-48 
Savage, Md. (NAB) 4-39 
Savage River Dam, Md. (NAB) 4-36 
Savanna Harbor, Ill. (NCD) 29-7 
Savannah Harbor, Ga. (SAS) 8-4, 8-6, 8-10, 8-11, 
8-14 
Savannah River above Augusta, Ga. (SAS) 8-16 
Savannah River. at Augusta, Ga. (SAS) 8-16 
Savannah River Basin, Ga. and S.C. (SAS) 8-8, 
8-17 
Savannah River below Augusta, Ga. (SAS) 8-5, 
8-6, 8-11, 8-15 
Saw Mill River at Elmsford and Greenburgh, N.Y. 
(NAN) 2-19, 2-31 
Sawkill Creek, Kingston, N.Y. (NAN) 2-39 
Sawmill Branch, S.C. (SAN) 7-8, 7-16 
Saxis Island, Va. (NAO) 5-11, 5-17, 5-21 
Saxman, Alaska (NPA) 40-15 
Saxon Harbor, Wis. (NCE) 31-23, 31-43, 31-56 
Saxonville, Mass. (NED) 1-22, 1-43, 1-51 
Saxtons River, Rockingham, Vt. (NED) 1-24 
Sayers, Foster Joseph, Dam, Pa. (NAB) 4-18, 4-26 
Saylorville Lake, Iowa (NCR) 28-5, 28-9, 28-12 
Scajaquada Creek, N.Y. (NCB) 32-37 
Scappoose Drainage District, Oreg. (NPP) 37-40, 
37-48 
Scarboro River, Maine (NED) 1-40 
Schuyler, Nebr. (MRO) 21-20 
Schuylkldll River, Pa. (NAP) 3-9, 3-16, 3-20 
Schuylkill River above Fairmount Dam, Pa. (NAP) 
3-21 
Schuylkill River-Fairmount Park, Pa. 3-8 
Scioto River at Portsmouth, Ohio (ORH) 25-19 
Sciotoville, Ohio (ORH) 25- 21 
Scituate Harbor, Mass. (NED) 1-22, 1-40, 1-46, 
1-53 
Scott, W. Kerr, Dam and Reservoir, N.C. (SAW) 
6-13, 6-16, 6-20 
Scott County Drainage and Levee District, Ill. (LMS) 
14-15 
Scotts Creek, S.C. (SAW) 7-7, 7-10, 7-14 
Scotts Creek, Va. (NAO) 5-20, 5-25 
Scottsville, Va. (NAO) 5-12, 5-17, 5-21 
Scranton, Pa. (NAB) 4-36, 4-39 
Scranton, Buffalo, N. Dak. (MRO) 21-19 
Scuppernong River, N.C. (SAW) 6-13, 6-20, 6-25 
Sea Bright to Ocean Township, N.J. (NAN) 2-17, 
2-25, 2-31 
Seahorn Drainage and Levee District, Ill. (NCR) 
28-15, 28-17 
Searsport Harbor, Maine (NED) 1-40 
Seaside Park, Conn. (NED) 1-42 
Seattle Harbor, Wash. (NPS) 38-6, 38-15, 38-21 
Sebasticook River, Hartland, Maine (NED) 1-20, 
1-30, 1-36, 1-43 
Sebewaing, Sebewaing River, Mich. (NCE) 31-27, 
31-45, 31-56, 31-61 
Seekonk River, R.I. (NED) 1-40 
Seldovia Harbor, Alaska (NPA) 40-13 
Selkirk Shore State Park, N.Y. (NCB) 32-36 
Sergius Whitestone, Alaska (NPA) 40-13 
Sespe Creek at Fillmore, Calif. (SPL) 33-20 
Sesuit Harbor, Mass. (NED) 1-40, 1-53 
Sevier River near Redmond, Utah (SPK) 35-31 
Sewage Lagoons, Vale, Oreg. (NPW) 39-15 
Sewage Treatment Plant, Missoula, Mont. (NPS) 
38-28 
Seward, Nebr. (MRK) 20-17 
Seward Harbor, Alaska (NPA) 40-13, 40-15 
Sewerline Protection, Valley, Ala. (SAM) 10-16, 
10-29, 10-39 
1-43

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Shad Landing State Park, Md. (NAB) 4-34 
Shallotte River, N.C. (SAW) 6-25, 6-29 
Shark River, N.J. (NAN) 2-33, 2-34 
Shawneetown, Ill. (ORL) 24-20, 24-21, 24-24, 
24-29 
Sheboygan Harbor, Wis. (NCE) 31-23, 31-43, 
31-56 
Sheepshead Bay, N.Y. (NAN) 2-34, 2-38 
Sheffield, Mass. (NED) 1-22, 1-50 
Sheffield Lake Community Park, Ohio (NCB) 32-39 
Shelburne, N.H. (NED) 1-22, 1-43 
Shell Creek, Nebr. (MRO) 21-18, 21-21 
Shelley Area, Idaho (NPW) 39-15, 39-16 
Shelton Creek, Wash. (NAS) 38-28 
Shelton Ditch, Oreg. (NPP) 37-42 
Shenango River Lake, Pa. and Ohio (ORP) 26-9, 
26-14, 26-20, 26-27 
Shepard Road, St. Paul, Minn. (NCS) 27-24 
Sherburne, N.Y. (NAB) 4-39 
Sheridan, Wyo. (MRO) 21-17, 21-19 
Sherwood Island State Park, Conn. (NED) 1-42 
Sheyenne River, N. Dak. (NCS) 27-14, 27-21, 
27-25 
Shidler Lake, Okla. (SWT) 19-15 
Shields River, near Clyde Park, Mont. (MRO) 21-17, 
21-19 
Shilshole Bay, Seattle, Wash. (NPS) 38-25 
Shinnecock Inlet, N.Y. (NAN) 2-14, 2-25, 2-30 
Shipyard River, S.C. (SAN) 7-6, 7-10, 7-13 
Shoal Harbor and Comptori Creek, N.J. (NAN) 
2-33, 2-34 
Shoals, Ind. (ORL) 24-22 
Shobe Canyon, Oreg. (NPW) 39-15 
Shooters Island, N.Y. and N.J. (NAN) 2-34 
Shoreline Erosion Control Demonstration, 
Philadelphia, Pa. District (NAP) 3-10 
Shoreline Erosion Control Work Under Special 
Authorization 
Philadelphia, Pa., District (NAP) 3-10 
Pittsburgh, Pa., District (ORP) 26-29 
Short Beach, Conn. (NED) 1-42 
Shoshone River, Bank Protection, Lovell, Wyo. 
(MRO) 21-19 
Shoshone River, Lovell, Wyo. (MRO) 21-19 
Shot Pouch Creek, S.C. (SAN) 7-8, 7-16 
Shrewsbury River, N.J. (NAN) 2-14, 2-25, 2-30, 
2-33 
Shufflebarger Levee, Ind. (ORL) 24-22, 24-25 
Sid Simpson Project, Ill. (NCR) 28-15 
Siler City Streams, N.C. (SAW) 6-31 
Silver Beach to Cedar Beach, Conn. (NED) 1-42 
Silver LakeHarbor, N.C. (SAW) 6-8, 6-19, 6-23 
Simmons Bay, N.C. (SAW) 6-27 
Simpson Creek, S.C. (SAN) 7-8, 7-16 
Sioux City, Iowa (MRO) 21-21 
Sioux City Marina, Iowa (MRO) 21-2, 21-10 
Sioux Falls, S. Dak. (MRO) 21-17, 21-20 
Sistersville, Ohio (ORH) 25-21 
Sitka Harbor, Alaska (NPA) 40-13, 40-15 
Siuslaw River, Oreg. (NPP) 37-8, 37-25, 37-34, 
37-42 
Six Runs Creek, N.C. (SAW) 6-28 
Sixes Bridge Lake, Md. and Pa. (N) 4-37 
Skaggs Ferry, Black River, Ark. (SWL) 18-17 
Skagit Creek, Wash. (Avon By-Pass) (NPS) 38-28 
Skagit River, Wash. (NPS) 38-25, 38-28, 38-30 
Skagit River, Wash. (Levee and Channel 
Improvements) (NPS) 38-27 
Skagway Harbor, Alaska (NPA) 40-13, 40-15 
Skagway River, Alaska (NPA) 40-14 
Skamokawa Creek, Wash. (NPP) 37-9, 37-26, 
37-34, 37-45 
Skamokawa Creek Area, Wash. (NPP) 37-40 
Skamokawa (Steamboat Slough), Wash. (NPP) 
37-44 
Skiatook Lake, Okla. (SWT) 19-6, 19-12, 19-14, 
19-18 
Skipanon Channel, Oreg. (NPP) 37-9, 37-26, 
37-34 
Slaughter Creek, Md. (NAB) 4-9, 4-23, 4-30 
Slovan, Pa. (ORP) 26-22 
Small Boat Harbor Opposite Chester, Ill. (LMS) 
14-13 
Small Boat Harbor Opposite Hamburg, Ill. (LMS) 
14-13 
Small Navigation Project at Sioux City, Iowa (MRO) 
21-16 
Smelt Brook, Mass. (NED) 1-43 
Smith Creek, Colo. (SWA) 17-7, 17-10 
Smith Creek, Md. (NAB) 4-34, 4-38 
Smith Creek, Pamlico County, N.C. (SAW) 6-25 
Smith Ferry, Pa. (ORP) 26-23 
Smith River, Oreg. (NPP) 37-39 
Smithfield, W. Va. (ORH) 25-22 
Smithland, Ky. (ORL) 24-21, 24-24 
Smithland Locks and Dam, Ky. (ORD) 22-3, 22-9 
Smiths Creek (Wilmington), N.C. (SAW) 6-25 
Smithville Channel, Little Platte River, Mo. (MRK) 
20-17 
Smithville Lake, Little Platte River, Mo. (MRK) 
20-6, 20-12, 20-15 
Smoky Hill, Saline, and Solomon Rivers (MRK) 
20-19 
Smyrna River, Del. (NAP) 3-21, 3-24 
Snagging and Clearing Activities 
Buffalo, N.Y., District (NCB) 32-38 
Charleston, S.C., District (SAN) 7-7 
Huntington, W.Va., District (ORH) 25-11 
Louisville, Ky., District (ORL) 24-13, 24-31 
New England Division (NED) 1-23 
Rock Island, Ill., District (NCR) 28-18 
Sacramento, Calif., District (SPK) 35-19 
I-44

INDEX 
St. Paul, Minn., District (NCS) 27-28 
Tulsa, Okla., District (SWT) 19- 19 
Vicksburg, Miss., District (LMK) 12-8 
Walla Walla, Wash., District (NPW) 39-2 
Snake River, Idaho (NPW) 39-15, 39-17 
Snake River, Minn. (NCS) 27-28 
Snake River Downstream from Johnson Bar 
Landing, Oreg., Wash., and Idaho (NPW) 39-7, 
39-10, 39-12, 39-22 
Snettisham, Alaska (NPA) 40-6, 40-10, 40-12 
Snohomish River, Wash. (NPS) 38-28 
Snoqualmie River, Wash. (NPS) 38-28 
Sny Basin, Ill. (NCR) 28-15, 28-17 
Sny Island Levee Drainage District, Ill. (NCR) 
28-15, 28-17 
Soap Creek, Wash. (NPP) 37-44 
Socorro Diversion Channel, Tributaries of Rio 
Grande, N. Mex. (SWA) 17-7, 17-10 
Soleduck River Bridge, Wash. (NPS) 38-28 
Somerville Lake, Tex. (SWF) 16-11, 16-17, 16-20 
Sonoma Creek, Calif. (SPK) 35-31 
Sope Creek, Marietta, Ga. (SAM) 10-16, 10-29, 
10-39 
Soules Swamp, Whiteville, N.C. (SAW) 6-31 
Souris River, Velva, N. Dak. (NCS) 27-15, 27-21 
South Amsterdam, Mohawk River, N.Y. (NAN) 2-36 
South Bank Arkansas River, (Head Fourche Island 
to Pennington Bayou), Ark. (SWL) 18-17 
South Bank Arkansas River, Little Rock to Pine 
Bluff, Ark. Tucker Lakes (SWL) 18-17 
South Beardstown and Valley Drainage and Levee 
District, Ill. (NCR) 28-15 
South Beardstown Drainage and Levee District, Ill. 
(NCR) 28-15, 28-17 
South Beloit, Ill. (NCR) 28-15 
South Bristol Harbor, Maine (NED) 1-40 
South Channel, Government Island, Oreg. (NPP) 
37-39 
South Coventry Lake, Conn. (NED) 1-45 
South Creek, N.C. (SAW) 6-27 
South Deer Creek Levee, Okla. (SWT) 19-17 
South Ellenville, N.Y. (NAN) 2-36 
South Fork, Boise River, Idaho (NPW) 39-15 
South Fork, Clearwater River, Idaho (NPW) 39-15, 
39-16 
South Fork of Cumberland River, Ky. (ORN) 23-13 
South Fork of the Santa Clara River, Calif. (SPL) 
33-20 
South Haven Harbor, Mich. (NCE) 31-24, 31-43, 
31-56 
South Milwaukee Harbor, Wis. (NCE) 31-63 
South Orange, N.J. (NAN) 2-36 
South Platte River, Adams County, Colo. (MRO) 
21-20 
South Platte River, Bank Protection, Denver, Colo. 
(MRO) 21-20 
South Platte River Basin, Colo. (MRO) 21-6, 21-15 
South Platte River, Iliff, Colo. (MRO) 21-20 
South Platte River, Kersey, Colo. (MRO) 21-20 
South Platte River Levees and Channel 
Improvements, Chatfield Lake to Ft. Morgan, 
Colo. (MRO) 21-17 
South Platte River, Merino, Colo. (MRO) 21-20 
South Platte River, Platteville, Colo. (MRO) 21-20 
South Plymouth Lake, N.Y. (NAB) 4-38 
South Point, Ohio (ORH) 25-20 
South Portsmouth, Ky. (ORH) 25-20 
South Quincy Drainage and Levee District, Ill. 
(NCR) 28-9, 28-15, 28-17 
South River, N.C. (SAW) 6-25 
South River, Conway, Mass. (NED) 1-15, 1-24, 
1-29 
South River Drainage District, Mo. (NCR) 28-15, 
28-17 
South Slough (Charleston), Oreg. (NPP) 37-39 
South Tunbridge Lake, Vt. (NED) 1-45 
South Williamson, Ky. (ORH) 25-22 
South Williamsport, Pa. (NAB) 4-39 
Southern Branch, Va. (NAO) 5-19 
Southern New York Flood Control Projects (NAB) 
4-13, 4-32 
Southport Beach, Conn. (NED) 1-42 
Southport Harbor, Conn. (NED) 1-40 
Southwest Harbor, Maine (NED) 1-40 
Southwestern Jefferson County, Ky. (ORL) 24-5, 
24-14 
Sowashee Creek, Meridian, Miss. (SAM) 10-43 
Space Programs Laboratory 51-1 
Spanish Fork River, Utah (SPK) 35-33 
Spewrell Bluff Lake, Ga. (SAM) 10-23, 10-30, 
10-41 
Spirit Lake, Wash. (NPP) 37-14 
Spokane, Wash. (NAS) 38-28 
Spring City, Tenn. (ORN) 23-19 
Spring Lake Drainage and Levee District, Ill. (NCR) 
28-15, 28-17 
Springdale, Mass. (NED) 1-43, 1-49 
Springer, William L., Lake, Ill. (NCR) 28-16 
Springfield, Mass. (NED) 1-22, 1-44, 1-49 
Springfield, S.D., Water Intake (MRO) 21-18 
Springfield Canal, Ga. (SAS) 8-7 
Squantz Pond, New Fairfield, Conn. (NED) 1-22, 
1-44, 1-50 
Squaw Chute at Quincy, Ill. (NCR) 28-13 
St. Albans Harbor, Lake Champlain, Vt. (NAN) 2-34 
St. Anthony Falls, Lower Lock and Dam, Minn. 
(NCD) 29-5, 29-9 
St. Anthony Falls, Upper Lock, Minn. (NCD) 29-5 
St. Augustine Harbor, Fla. (SAJ) 9-14, 9-28, 9-37 
St. Catherines Sound, Md. (NAB) 4-34, 4-38 
St. Clair River, Mich. (NCE) 31-21, 31-42, 31-54, 
31-58, 31-63 
1-45

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
St. Croix River, Maine (NED) 1-39 
St. Croix River, Minn. and Wis. (NCS) 27-2, 27-19, 
27-22 
St. Francis and L'Anguille Rivers and Blackfish 
Bayou, Ark. (LMM) 13-5 
St. Francis Basin, Ark. and Mo. (MR+T) 42-9, 
42-28, 42-53 
St. Francis River and Basin, Ark. and Mo. (MR+T) 
42-9, 42-18 
St. Francis River, Highway 90, Ark. (LMM) 13-6 
St. Francis River Levees (MR+T) 42-48, 42-49 
St. Georges Creek, Md. (NAB) 4-34, 4-37 
St. James, Beaver Island, Mich. (NCE) 31-62 
St. James Harbor, Mich. (NCE) 31-61 
St. Jeromes Creek, Md. (NAB) 4-34, 4-38 
St. Johns River, Fla., Jacksonville to Lake Harney 
(SAJ) 9-14, 9-28, 9-37 
St. Johns River and Tributaries and Withlacoochee, 
Kissimmee and Crystal Rivers, Fla. (SAJ) 9-45 
St. Jones River, Del. (NAP) 3-21, 3-22 
St. Joseph Harbor, Mich. (NCE) 31-21, 31-42, 
31-54 
St. Joseph River, Mich. (NCE) 31-62 
St. Louis County Drainage and Levee District No. 1, 
Mo. (LMS) 14-15 
St. Louis District (NCD) 29-3, 29-4 
St. Lucie Inlet, Fla. (SAJ) 9-15, 9-28, 9-37 
St. Maries, Idaho (NAS) 38-28 
St. Marks River, Fla. (SAM) 10-42, 10-45 
St. Marys, Pa. (ORP) 26-23 
St. Marys, W. Va. (ORH) 25-21 
St. Marys River, Ga. and Fla., and North River, Ga. 
(SAS) 8-16 
St. Marys River, Mich. (NCE) 31-22, 31-43, 31-55, 
31-59, 31-63 
St. Michael Canal, Alaska (NPA)40-13 
St. Michaels Harbor, Md. (NAB) 4-34 
St. Patricks Creek, Md. (NAB) 4-8, 4-23, 4-30 
St. Paul, Minn. (NCS) 27-27 
St. Paul and South St. Paul, Minn. (NCS) 27-24 
St. Paul District (NCD) 29-3, 29-4 
St. Paul Harbor, Minn. (NCD) 29-7 
St. Peters Creek, Md. (NAB) 4-34 
St. Petersburg Harbor, Fla. (SAJ) 9-45, 9-46 
St. Thomas Harbor, V.I. (SAJ) 9-46 
Ste. Genevieve County Drainage and Levee District 
No. 1, Mo. (LMS) 14-15 
Stamford, Conn. (NED) 1-20, 1-22, 1-31, 1-37 
Stamford Barrier, Conn. (NED) 1-23 
Stamford Harbor, Conn. (NED) 1-40, 1-45 
Starlings Creek, Va. (NAO) 5-24 
Startup, Wash. (NAS) 38-28 
Starved Rock Lock and Dam, Ill. (NCC) 28-20 
State Highway 101 and 401, Wash. (NPP) 37-40 
State Road and Ebner Coulees, Wis. (NCS) 27-15, 
27-21 
Staten Island, N.Y. (NAN) 2-36 
Staten Island Rapid Transit Railway Co. Bridge 
Across Arthur Kill, N.Y. (NAN) 2-34 
Steinhatchee River, Fla. (SAJ) 9-46 
Stewart Canyon Debris Basin and Channel, Calif. 
(SPL) 33-20 
Stikine River, Alaska (NPA) 40-13 
Stillaguamish River, Wash. (NPS) 38-9, 38-17, 
38-22, 38-25, 38-29 
Stillhouse Hollow Dam, Tex. (SWF) 16-11, 16-17, 
16-21 
Stillwater and Whitefish Rivers, Mont. (NPS) 38-29 
Stillwater Lake, Pa. (NAB) 4-16, 4-26, 4-32 
Stillwater River, Mont. (NPS) 38-29 
Stillwell Drainage District, Oreg. (NPP) 37-42 
Stockton and Mormon Channels, Calif. (SPK) 35-30 
Stockton Harbor, Maine (NE) 1-40 
Stockton Lake, Mo. (MRK) 20-9, 20-12, 20-16, 
20-19 
Stone Harbor, N.J. (NAP) 3-23 
Stonehouse Creek, Kans. (MRK) 20-17 
Stoner Creek, Ky. (ORL) 24-30 
Stonewall Jackson Lake, W. Va. (ORP) 26--9, 
26-15, 26-20, 26-27 
Stonington Harbor, Conn. (NED) 1-40, 1-46 
Stonington Harbor, Maine (NED) 1-40, 1-45, 1-53 
Stony Brook, Wilton, N.H. (NED) 1-44 
Stony Creek, Branford, Conn. (NED) 1-40 
Stratford, Conn. (NED) 1-45 
Streambank Erosion Control Evaluation and 
Demonstration Project 
New England Division (NED) 1-23 
Omaha, Nebr., District (MRO) 21-9, 21-12, 
21-16 
Pittsburgh, Pa., District (ORP) 26-29 
Strington, Ft. Chartres and Ivy Landing, Ill. (LMS) 
14-15 
Strong Creek, Idaho (NPS) 38-29 
Strube Lake - Cougar Additional Unit, (South Fork 
McKenzie) (Modification to Cougar Lake) Oreg. 
37-49 
Stuart, Va. (SAW) 6-13, 6-20 
Stuart Gulch Dam, Boise, Idaho (NPW) 39-16 
Stumpy Point Bay, N.C. (SAW) 6-25 
Sturgeon Bay and Lake Michigan Ship Canal, Wis. 
(NCE) 31-24, 31-43, 31-56 
Sturgis, Ky. (ORL) 24-20, 24-24, 24-29 
Subdistrict No. 1 of Drainage Union No. 1 and Bay 
Island Drainage and Levee District No. 1, Ill. 
(NCR) 28-15, 28-17 
Sucker Brook Dam, Conn. (NED) 1-22, 1-44, 1-48 
Sugar Creek Basin, N.C. and S.C. (SAN) 7-17 
Sugar Creek Levee, Ind. (ORL) 24-22, 24-25 
Sugar Hill Reservoir, N.H. (NED) 1-45 
Suisun Bay Channel, Calif. (SPK) (SPN) 34-7, 
35-30 
1-46

INDEX 
Suisun Channel, Calif. (SPK) (SPN) 34-7, 35-30 
Suisun Point Channel, Calif. (SPK) 35-30 
Sullivan Falls Harbor, Maine (NED) 1-40 
Sulphur River, Ark. and Tex. (LMN) 11-15 
Sulphur River Levees, Tex. (SWF) 16-22 
Summersville Lake, W. Va. (ORH) 25-9, 25-15, 
25-18 
Sumner Parker Airport, Oreg. (NPP) 37-42 
Sumpawanus (Babylon Creek) Inlet, N.Y. (NAN) 
2-34 
Sun Creek, Miss. (SAM) 10-43 
Sunbury, Pa. (NAB) 4-36, 4-39 
Sunken Vessel Removal 48-1 
Supervision of the Harbor of Hampton Roads 
(Prevention of Obstructive and Injurious 
Deposits) (NAO) 5-8, 5-16 
Supervisor of New York Harbor (NAN) 2-16, 2-25, 
2-32 
Surry Mountain Lake, N.H. (NED) 1-15, 1-29, 
1-48 
Surveillance of Northern Boundary Waters (NCE) 
31-29, 31-45 
Susquehanna Basin at Harrisburg, Pa. (NAB) 4-20 
Susquehanna River above and below Havre De 
Grace, Md. (NAB) 4-34 
Susquehanna River at Williamsport, Pa. (NAB) 4-34 
Susquehanna River Flood Control Projects, N.Y. and 
Pa. (NAB) 4-17, 4-32 
Sutton Lake, W. Va. (ORH) 25-9, 25-15, 25-18 
Suwannee River, Fla. (SAJ) 9-45, 9-46 
Swan Creek Bank Stabilization, Taney County, Mo. 
(SWL) 18-7, 18-12 
Swanton Harbor, Vt. (NAN) 2-38 
Sweetwater Creek, N.C. (SAW) 6-28 
Sweetwater River, Calif. (SPL) 33-7, 33-12, 33-17 
Swift Creek, N.C. (SAW) 6-25 
Swift Creek, Pitt and Craven Counties, N.C. (SAW) 
6-27 
Swinomish Channel, Wash. (NPS) 38-6, 38-16, 
38-21 
Swoyersville, and Forty Fort, Pa. (NAB) 4-36, 4-39 
Sykesville, Pa. (ORP) 26-22 
Syracuse, N.Y. (NCB) 32-37 
Syracuse, Ohio (ORH) 25-21 
T 
Table Rock Lake, Mo. (SWL) 18-9, 18-13, 18-24 
Tacoma, Puyallup River, Wash. (NPS) 38-10, 
38-17, 38-23 
Tacoma Harbor, Wash. (NPS) 38-7, 38-16, 38-21, 
38-31 
Tahchevah Creek Detention Basin and Channel 
Improvements, Calif. (SPL) 33-21 
Tahola, Wash. (NPS) 38-29 
Tahquitz Creek, Calif. (SPL) 33-21 
Talkeetna River, Alaska (NPA) 40-14 
Tallabinella Creek, Miss. (SAM) 10-16, 10-29, 10-39 
Tallahala Creek Lake, Miss. (SAM) 10-13, 10-28, 
10-38 
Tallahatchie and Coldwater Rivers, Miss. (LMK) 
12-14 
Tallapoosa River, Ala. (SAM) 10-42 
Tallow Hill, Ga. (SAS) 8-17 
Talofofo Bay Shore Protection, Guam (POD) 36-12 
Tamaqua, Pa. (NAP) (NAB) 3-23, 4-21 
Tampa and Hillsborough Bays, Fla. (SAJ) 9-38 
Tampa Bay, Fla. (SAJ) 9-38 
Tampa Harbor, Fla. (SAJ) 9-16, 9-28, 9-38 
Tangeman, Nebr. (MRO) 21-20 
Tangier Channel, Va. (NAO) 5-8, 5-16, 5-20 
Tangipahoa River, La. (LMN) 11-15 
Tar River, N.C. (SAW) 6-27 
Tar River and Tributaries, N.C. (SAW) 6-27 
Tar River, Princeville, N.C. (SAW) 6-27 
Tarentum, Pa. (ORP) 26-22 
Tarrytown Harbor, N.Y. (NAN) 2-35 
Taskinas Creek, Va. (NAO) 5-24 
Tau Small Boat Harbor, American Samoa (POD) 
36-8 
Taunton River, Mass. (NED) 1-40 
Tawas Bay Harbor, Mich. (NCE) 31-24, 31-44, 
31-56 
Taylors Bayou, Tex. (SWG) 15-10, 15-15, 15-25 
Taylorsville, Ky. (ORL) 24-20, 24-24, 24-29 
Taylorsville Lake, Ky. (ORL) 24-11, 24-17 
Teche-Vermilion Basins, La. (Water Supply) 
(MR+T) 42-50, 42-59 
Telegraph Canyon Creek, Calif. (SPL) 33-20 
Tell City, Ind. (ORL) 24-20, 24-24, 24-29 
Tenants Harbor, Maine (NED) 1-40 
Tenasillahe Island, Oreg. (NPP) 37-40 
Tenkiller Ferry Lake, Okla. (SWL) (SWT) 18-22, 
19-8, 19-13, 19-15, 19-16, 19-18 
Tenmile Creek at Marianna, Pa. (ORP) 26-22 
Tennessee River, Tenn., Ala., and Ky. (ORN) 23-3, 
23-9, 23-11, 23-17, 23-18 
Tennessee-Tombigbee Waterway, Ala. and Miss. 
(ORN) (SAM) 10-48, 23-4, 23-9, 23-12 
Tensas Basin, Ark. and La. (MR+T) 42-6, 42-15, 
42-28 
Tensas River and Bayou Macon, La. (LMK) 12-15 
Tensas River National Wildlife Refuge (MR+T) 
42-28 
Terrain Analysis Center 51-1 
Terre Haute, Ind. (ORL) 24-22 
Terre Haute (Conover Levee), Ind. (ORL) 24-20, 
24-29 
Terre Noire Creek, Ark. (LMK) 12-16 
Terry, David D., Lock and Dam, Ark. (SWL) 18-2, 
18-19 
1-47

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Teton River, Idaho (NPW) 39-15, 39-16 
Texas City and Vicinity, Tex., Hurricane-Flood 
Protection (SWG) 15-11, 15-15, 15-25 
Texas City Channel, Tex. (SWG) 15-7, 15-14, 
15-24, 15-28 
Thames River, Conn. (NED) 1-40 
Thames River Basin, Conn., R.I., and Mass. (NED) 
1-21, 1-23, 1-52 
The Cascades Canal, Oreg. (NPP) 37-39 
The Dalles-Celilo Canal, Oreg. and Wash. (NPP) 
37-39 
The D)alles Lock and Dam-Lake Cello, Wash. and 
Oreg. (NPP) 37-22, 37-29, 37-38, 37-52 
The Island Lake, Vt. (NED) 1-45 
Thimble Shoal Channel, Va. (NAO) 5-24 
Thomaston Dam, Conn. (NED) 1-17, 1-30, 1-49 
Thoroughfare Swamp, N.C. (SAW) 6-28 
Three Forks, Mont. (MRO) 21-19 
Three Islands Reservoir, Tenn. (ORN) 23-14 
Three Rivers, Mass. (NED) 1-22, 1-44, 1-49 
Three Rivers, Tex. (SWG) (SWF) 15-27, 16-21 
Thumpertown Beach, Eastham, Mass. (NED) 1-45 
Tickfaw, Natalbany, Ponchatoula, and Blood Rivers, 
La. (LMN) 11-15 
Ticonderoga River, N.Y. (NAN) 2-38 
Tijuana River Basin, Calif. (SPL) 33-20 
Tilghman Island Harbor, Md. (NAB) 4-34 
Tillamook Bay and Bar, Oreg. (NPP) 37-9, 37-26, 
37-34, 37-45 
Tioga-Hammond Lakes, Pa. (NAB) 4-17, 4-26 
Tionesta Lake, Pa. (ORP) 26-10, 26-15, 26-20, 
26-27 
Toad Suck Ferry Lock - Dam, Ark. (SWL) 18-4, 
18-19 
Tocks Island Lake, Pa., N.J., and N.Y. (NAP) 3-24 
Tocks Island (Relocation of U.S. Route 209 Only) 
Pa. (NAP) 3-24 
Todd Swamp, S.C. (SAN) 7-8, 7-16 
Togiak Harbor, Alaska (NPA) 40-15 
Toledo Harbor, Ohio (NCB) 32-10, 32-21, 32-32 
Tolovana River, Alaska (NPA) 40-14 
Tolu, Ky. (ORL) 24-21, 24-24 
Tom Jenkins Dam, Ohio (ORH) 25-15, 25-18 
Tom Jenkins Reservoir, Ohio (ORH) 25-10 
Tomahawk Lake, Kans. (MRK) 20-17 
Tomanovich-Salmon City, Idaho (NPW) 39-15, 
39-19 
Tombigbee River, Miss. and Ala. (SAM) 10-17, 
10-29, 10-39 
Tombigbee River Tributaries, Miss. and Ala. (SAM) 
10-17, 10-29, 10-40 
Toms River, N.J. (NAP) 3-21, 3-24 
Tongue River Lake, N. Dak. (NCS) 27-24 
Topeka, Kans. (MRK) 20-17, 20-19 
Topographic Laboratory 51-1 
Topsail Beach and Surf City, N.C. (SAW) 6-28 
Toronto Lake, Kans. (SWL) (SWT) 18-22, 19-6, 
19-12, 19-14, 19-16, 19-18 
Torrington, East Branch, Conn. (NED) 1-22, 1-44, 
1-50 
Torrington, West Branch, Conn. (NED) 1-22, 1-44, 
1-50 
Totuskey Creek, Va. (NAO) 5-24 
Touchet River, Wash. (NPW) 39-15, 39-16 
Towanda Lake, Kans. (SWT) 19-15 
Town Beach, Plymouth, Mass. (NED) 1-42 
Town Bluff Dam-B. A. Steinhagen Lake, Tex. 
(SWF) 16-13, 16-17, 16-21 
Town Bluff Hydropower, Tex. (SWF) 16-13, 16-21 
Town Creek, Md. (NAB) 4-34, 4-38 
Town Creek, S.C. (SAN) 7-7, 7-10, 7-14 
Town Creek, Americus, Ga. (SAM) 10-43 
Town Creek, Harrodsburg, Ky. (ORL) 24-20 
Town Neck Beach, Sandwich, Mass. (NED) 1-42 
Townsend Inlet and Seven Mile Beach, N.J. (NAP) 
3-23 
Townshend Lake, Vt. (NED) 1-15, 1-29, 1-48 
Trabuco Dam, Calif. (SPL) 33-24 
Tradewater River, Ky. (ORL) 24-19 
Tranquitas Creek, Kingsville, Tex. (SWG) 15-27 
Tranters Creek, N.C. (SAW) 6-28 
Trask River, Oreg. (NPP) 37-43 
Traverse City Harbor, Mich. (NCE) 31-61, 31-62 
Treasure Island, Mo. (LMM) 13-6 
Treatment of Yuba River Debris Situation- 
Restraining Barriers, Calif. (CDC) 44-2, 44-5 
Tred Avon River, Md. (NAB) 4-9, 4-24, 4-31 
Trent River, N.C. (SAW) 6-25, 6-27, 6-28 
Trenton Lake, Mo. (MRK) 20-17 
Trexler Lake, Pa. (NAP) 3-23 
Trim Cane Creek, Miss. (SAM) 10-43 
Trinidad Lake, Colo. (SWA) 17-5, 17-8 
Trinity River and Tributaries, Tex. (SWG) 15-7, 
15-14, 15-24, 15-28, 15-35 
Trinity River Project, Tex. (SWF) 16-2, 16-15, 
16-21 
Triplett Creek, Morehead, Ky. (ORL) 24-20, 24-30 
Tri-Pond Levee, Ill. (ORL) 24-22, 24-25 
Trotters Shoals Lake (SAS) 8-9, 8-12, 8-15 
Troublesome Creek, Hindman, Ky. (ORL) 24-30 
Troy, Ind. (ORL) 24-22, 24-25 
Truckee River and Tributaries, Calif. and Nev. (SPK) 
35-31 
Truman, Harry S., Dam and Reservoir, Mo. (MRK) 
20-8, 20-12, 20-16, 20-19 
Trumbull Lake, Conn. (NED) 1-44 
Trussville, Ala. (SAM) 10-43 
Truth or Consequences (Hot Springs) Unit, N. Mex. 
(SWA) 17-5, 17-9 
Tualatin, Oreg. (NPP) 37-43 
Tucannon River, Camp Wooten, Wash. (NPW) 
39-15 
1-48

INDEX 
Tuckahoe River, Md. (NAB) 4-34 
Tuckerton Creek, N.J. (NAP) 3-9, 3-16, 3-20 
Tucson Diversion Channel, Ariz. (SPL) 33-5, 
33-11, 33-16 
Tug and Levisa Forks of the Big Sandy River and 
Cumberland River, W. Va., Va., and Ky. (ORN) 
23-5, 23-9 
Tully Lake, Mass. (NED) 1-16, 1-29, 1-48 
Tulsa and West Tulsa Levee, Okla. (SWT) 19-15, 
19-17, 19-18 
Turkey Creek, S.C. (SAN) 7-8, 7-16 
Turtle Creek, Pa. (ORP) 26-22 
Turtle Creek Channel Improvement, Yukon, Okla. 
(SWT) 19-16 
Tuskahoma Lake, Okla. (SWT) 19-16 
Tuttle Creek Lake, Kans. (MRK) 20-6, 20-12, 
20-15, 20-19 
Tuttle Creek Lake (Road Improvement), Kans. 
(MRK) 20-19 
Twelvemile Bayou, La. (LMN) (LMK) 11-17, 12-20 
Twin Valley Lake, Wild Rice River, Minn. (NCS) 
27-16, 27-21 
Twitch Cove and Big Thorofare, Md. (NAB) 4-9, 
4-24, 4-31 
Two Harbors, Minn. (NCE) 31-61, 31-62 
Two Rivers Dam, N. Mex. (SWA) 17-6, 17-8 
Two Rivers Harbor, Wis. (NCE) 31-24, 31-44, 
31-56 
Tyaskin Creek, Md. (NAB) 4-34 
Tybee Island, Ga. (SAS) 8-6, 8-11, 8-15 
Tygart Lake, W. Va. (ORP) 26-3, 26-13, 26-17 
Tylers Beach, Va. (NAO) 5-24 
Tyrone, Pa. (NAB) 4-36, 4-39 
U 
Umatilla Harbor, Oreg. (NPP) 37-39 
Umatilla River (Echo), Oreg. (NPP) (NPW) 37-43, 
37-44, 39-15 
Umpqua River, Oreg. (NPP) 37-9, 37-26, 37-35 
Umpqua River and Tributaries, Oreg. (NPP) 37-43 
Unadilla, N.Y. (NAB) 4-36, 4-39 
Union City Dam, Pa. (ORP) 26-10, 26-15, 26-20, 
26-27 
Union Lake, Mo. (LMS) 14-15 
Union River, Maine (NED) 1-40, 1-53 
Union Township Drainage District, Mo. (NCR) 
28-15 
Union Village Dam, Vt. (NED) 1-16, 1-29, 1-48 
Uniontown, Ky. (ORL) 24-20, 24-24, 24-29 
Uniontown, Pa. (ORP) 26-22, 26-26 
Uniontown Locks and Dam, Ky. (ORL) 22-3, 22-9 
University Wash and Spring Brook, Riverside, Calif. 
(SPL) 33-20 
Upper and Lower Woonsocket, R.I. (NED) 1-22 
Upper Chipola River, Fla., from Mariana to its 
mouth (SAM) 10-42 
Upper Grand River, Mo. (MRK) 20-17 
Upper Grays River Area, Wash. (NPP) 37-40 
Upper Iowa River, Iowa (NCS) 27-24 
Upper Machodoc Creek, Va. (NAB) 4-34 
Upper Marlboro, Md. (NAB) 4-36, 4-39 
Upper Mississippi River Environmental Management 
Program, Ill., Ia., Minn., Mo., Wis. (NCR) 28-3, 
28-8, 28-11 
Upper Puyallup River, Wash. (NAS) 38-29 
Upper River Road, Jefferson Co., Ky. (ORL) 24-30 
Upper River Rouge, Mich. (NCE) 31-63 
Upper Thorofare, Deal Island, Md. (NAB) 4-10, 
4-24, 4-31 
Upper White River, Ark. (SWL) 18-16 
Urban Areas at Alton, Ill. (LMS) 14-15 
Urbanna Creek, Va. (NAO) 5-24 
U.S. Highway 11 Bridge, Fosters, Ala. (SAM) 10-17, 
10-29, 10-40 
U.S. Highway 43 Bridge, Linden, Ala. (SAM) 10-43 
U.S. Highway 45 Bridge, Prentiss County, Miss. 
(SAM) 10-17, 10-29, 10-40 
U.S. Highway 51, Tenn. (LMM) 13-6 
Utica, Ind. (ORL) 24-22, 24-26 
Utica, Ohio (ORH) 25-20, 25-22 
V 
Valdez Harbor, Alaska (NPA) 40-13 
Valley City Drainage and Levee District, Ill. (LMS) 
14-15 
Valley Drainage and Levee District, Ill. (NCR) 
28-17 
Van Buren, Arkansas River, Ark. (SWL) 18-17 
Van Meter, Iowa (NCR) 28-15, 28-17 
Vanceburg, Ky. (ORH) 25-20 
Vancouver Lake Area, Wash. (NPP) 37-41 
Vatia Area, American Samoa (POD) 36-10 
Vaughn, Mont. (MRO) 21-17, 21-19 
Velva, N. Dak. (NCS) 27-24, 27-27 
Ventnor, Margate and Longport, N.J. (NAP) 3-23 
Ventura Marina (Ventura Harbor), Calif. (SPL) 
33-3, 33-10, 33-15 
Ventura-Pierpont Area, Calif. (SPL) 33-19 
Ventura River Basin, Calif. (SPL) 33-20 
Vermilion Harbor, Ohio (NCB) 32-11, 32-21, 
32-33 
Vermilion Lock, La. (Replacement of Lock) (LMN) 
11-2, 11-10, 11-12 
Vermillion River, S.D. (MRO) 21-18 
Vermillion River, Hastings, Minn. (NCS) 27-24 
Verona Lake, Va. (NAB) 4-36 
Veteran's Memorial Levee, Hastings, Minn. (NCS) 
27-24 
1-49

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Vevay, Ind. (ORL) 24-22, 24-25 
Vicinity of Nehalem, Oreg. (NPP) 37-43 
Vicksburg Harbor, Miss. (MR+T) 42-29 
Victory Lake, Vt. (NED) 1-45 
Villa Park Dam, Calif. (SPL) 33-21, 33-24 
Village Creek, S.C. (SAN) 7-15 
Village Creek, Jackson- Lawrence Counties, Ark. 
(SWL) 18-17 
Village Creek, White River, and Mayberry Levee 
District, Ark. (SWL) 18-17 
Village of New Athens, Ill. (LMS) 14-15 
Village of Saxtons, Vt. (NED) 1-44 
Vince and Little Vince Bayous, Tex. (SWG) 15-11, 
15-15, 15-25 
Vincennes, Ind. (ORL) 24-20, 24-21, 24-24, 
24-29 
Vineyard Haven, Mass. (NED) 1-40 
Vinton Waterway, La. (LMN) 11-15 
Virginia Beach, Va. (NAO) 5-9, 5-16, 5-21 
Virginia Beach Streams Canal Number 2, Va. (NAO) 
5-12, 5-17, 5-21 
Virginia Key and Key Biscayne, Fla. (SAJ) 9-47 
Volga, Iowa (NCR) 28-17
W 
Wabash Railroad Bridges, Illinois River, Meredosia, 
and Valley City, Ill. (LMS) 14-13 
Wabash River Basin, Ind., Ill., and Ohio (ORL) 
24-11, 24-19, 24-27, 24-28, 24-30 
Wabasha Harbor, Minn. (NCD) 29-7 
Waccamaw River, N.C. and S.C. (SAN) 7-7, 7-15 
Waccamaw River and Seven Creeks, N.C. and S.C. 
(SAN) 6-27 
Waco Lake, Tex. (SWF) 16-11, 16-17, 16-21 
Wahkiakum County Consolidated Diking District No. 
1, Wash. (NPP) 37-48 
Wahkiakum County Diking District 4, Wash. (NPP) 
37-41, 37-48 
Waianae Small Boat Harbor, Hawaii (POD) 36-8 
Waikiki Beach, Hawaii (POD) 36-10 
Wailoa Stream and Tributaries, Hawaii (POD) 
36-11 
Waimea Beach, Hawaii (POD) 36-10 
Waimea River, Hawaii (POD) 36-4, 36-6 
Wake Island Harbor, Wake Island (POD) 36-8 
Waldo Lake Tunnel and Reregulating Works, Oreg. 
(NPP) 37-44, 37-49 
Wallabout Channel, N.Y. (NAN) 2-35 
Wallace, W. Va. (ORP) 26-22 
Wallace Channel, Pamlico Sound, N.C. (SAW) 6-25 
Wallace Lake, La. (LMK) 12-16, 12-18, 12-20 
Wallis Sands State Beach, N.H. (NED) 1-42 
Wallisville Lake, Tex. (SWG) 15-8 
Wallkll River, N.Y. (NAN) 2-39 
Wallowa River, Oreg. (NPW) 39-15 
Walluski River, Oreg. (NPP) 37-41 
Walnut Creek, Calif. (SPK) 35-17, 35-25 
Walter, Francis E., Dam, Pa. (NAP) (NAB) 3-12, 
3-17, 4-21 
Walter F. George Lock and Dam, Ala. and Ga. 
(SAM) 10-24, 10-31, 10-41 
Walters Slough, N.C. (SAW) 6-29 
Wappapello Lake, Mo. (MR+T) 42-20, 42-59 
Wappinger Creek, N.Y. (NAN) 2-35, 2-36 
Wappinger Creek at Pleasant Valley, N.Y. (NAN) 
2-36 
Ware, Mass. (NED) 1-22, 1-23, 1-44, 1-49 
Wareham Harbor, Mass. (NED) 1-40, 1-53 
Wareham-Marion, Mass. (NED) 1-45 
Warner Road, Mississippi River, St. Paul, Minn. 
(NCS) 27-16, 27-21 
Warren River, R.I. (NED) 1-40 
Warrenton Diking Districts 1, 2, and 3, Oreg. (NPP) 
37-41 
Warroad Harbor and River, Minn. (NCS) 27-3, 
27-19, 27-22, 27-25 
Warroad River and Bull Dog Creek, Minn. (NCS) 
27-24 
Warsaw, N.Y. (NCB) 32-37 
Warsaw Harbor, Ill. (NCD) 29-8 
Warwick Cove, R.I. (NED) 1-40 
Warwick River, Md. (NAB) 4-34 
Warwood, W. Va. (OPR) 26-22, 26-26 
Washington, D.C. and Vicinity (NAB) 4-21, 4-36, 
4-39 
Washington, Pa. (ORP) 26-22 
Washington Aqueduct (NAB) 4-20 
Washington Canal and South River, N.J. (NAN) 
2-35 
Washington Harbor, D.C. (NAB) 4-10, 4-24, 4-31 
Washington Island, Wis. (NCE) 31-61, 31-62 
Washougal Area Levees, Wash. (NPP) 37-42 
Water Resources Support Center (WRSC) 53-1 
Water Valley, Ark. and Mo. (SWL) 18-18 
Waterborne Commerce Statistics Center 53-1 
Waterbury, Vt. (NAN) 2-38 
Waterbury Dam, N.Y. (NAN) 2-20 
Waterbury Reservoir, Vt. (NAN) 2-36 
Waterbury-Watertown, Conn. (NED) 1-22, 1-44, 
1-50 
Wateree River, S.C. (SAN) 7-15 
Waterford, N.Y. (NAN) 2-38 
Waterloo, Iowa (NCR) 28-6, 28-12, 28-17 
Waterloo, Nebr. (MRO) 21-17, 21-20 
Waterway Connecting Pamlico Sound and Beaufort 
Harbor, S.C. (SAW) 6-8, 6-19, 6-23, 6-29 
Waterway Connecting Port Townsend and Oak Bay, 
Wash. (NPS) 38-7, 38-16, 38-22, 38-31 
Waterway Connecting Swanquarter Bay with Deep 
Bay, N.C. (SAW) 6-25 
1-50

INDEX 
Waterway Connecting Tombigbee and Tennessee 
Rivers, Ala. and Miss. (SAM) 10-11, 10-28, 
10-38 
Waterway from Empire, La., to Gulf of Mexico 
(LMN) 11-15 
Waterway from Indian River Inlet to Rehoboth Bay, 
Del. (NAP) 3-21 
Waterway from Intracoastal Waterway to Bayou 
Dulac, La. (Bayous Grand Caillou and LeCarpe, 
La.) (LMN) 11-5, 11-10, 11-12 
Waterway from Little Choptank River to Choptank 
River, Md. (NAB) 4-38 
Waterway from White Lake to Pecan Island, La. 
(LMN) 11-15 
Waterway-Norfolk, Va. to Sounds of N.C. (SAW) 
6-25 
Waterway on the Coast of Virginia (NAO) 5-8, 
5-16, 5-21 
Waterways Experiment Station (WES) 45-1 
Watkins Glen, N.Y. (NCB) 32-39 
Watts Bar Lock and Dam, Tenn. (ORN) 23-17 
Waukegan Harbor, Ill. (NCC) 30-5, 30-9, 30-13, 
30-14 
Waurika Lake, Okla. (SWT) 19-6, 19-12, 19-14, 
19-18 
Waverly, W. Va. (ORH) 25-21 
Wax Lake Outlet, La. (MR+T) 42-50 
Waycake Creek, N.J. (NAN) 2-35 
Webb District Improvement Co., Oreg. (NPP) 37-41 
Webbers Falls Lock and Dam, Okla. (SWL) (SWT) 
18-20, 19-8, 19-13, 19-15, 19-16 
Weber River and Tributaries, Utah (SPK) 35-33 
Weiser River, Weiser Area, Idaho (NPW) 39-15, 
39-16, 39-17 
Welles Harbor, Midway Island (POD) 36-8 
Wellfleet Harbor, Mass. (NED) 1-40 
Wells Harbor, Maine (NED) 1-40 
Wellsburg, W. Va. (ORP) 26-23 
Wellsville, N.Y. (NCB) 32-37 
Wellsville, Ohio, Sec. I (ORP) 26-22, 26-26 
Wellsville, Ohio, Sec. II (ORP) 26-22, 26-26 
Wenatchee Canyons 1 and 2, Wash. (NPS) 38-29 
Wessagusset Beach, Weymouth, Mass. (NED) 1-42 
West Atchalafaya Floodway, La. (MR+T) 42-13 
West Branch Chisholm Creek Channel Improvement, 
Kans. (SWT) 19-16, 19-18 
West Branch of Susquehanna River, Pa. (NAB) 
4-18, 4-33 
West Branch, Westfield River, Mass. (NED) 1-44 
West Bridgewater, Pa. (ORP) 26-23 
West Brookfield Reservoir, Mass. (NED) 1-45 
West Canaan Lake, N.H. (NED) 1-45 
West Fork, W. Va. (ORH) 25-20 
West Fork, Foster Creek, Wash. (NPS) 38-29 
West Fork of Mill Creek Lake, Ohio (ORL) 24-12, 
24-17, 24-27 
West Glendive, Mont. (MRO) 21-19 
West Harbor, Ohio (NCB) 32-11, 32-35 
West Hickman Area, Hickman, Ky. (LMM) 13-6 
West Hill Dam, Mass. (NED) 1-11, 1-27, 1-47 
West Kentucky Tributaries, Ky. (MR+T) 42-10, 
42-19, 42-28, 42-53 
West Magnesia Canyon Channel, Calif. (SPL) 33-7, 
33-12, 33-17 
West Makinster Road, Wilson River, Oreg. (NPP) 
37-16, 37-27, 37-37 
West Matanzas Drainage and Levee District, Ill. 
(NCR) 28-17 
West Muddy Creek and Marys River, Oreg. (NPP) 
37-44 
West Nishnabotna River, Mills Co. Bridge, near 
Hastings, Iowa (MRO) 21-21 
West Nishnabotna River, Mills Co. Bridge, near 
Malvern, Iowa (MRO) 21-21 
West Nishnabotna River, near Hancock, Iowa (MRO) 
21-21 
West of Morrilton, Arkansas River, Ark. (SWL) 
18-17 
West Oneonta Lake, N.Y. (NAB) 4-38 
West Point, Ga. (SAM) 10-43 
West Point, Ky. (ORL) 24-21, 24-24 
West Point, Nebr. (MRO) 21-17, 21-20 
West Point Lake, Ga. and Ala. (SAM) (SAS) 8-9, 
10-24, 10-31, 10-41 
West Springfield, Mass. (NED) 1-16, 1- -2, 1-29, 
1-36, 1-44, 1-49 
West Stewartstown, N.H. (NED) 1-22 
West Tennessee Tributaries, Tenn. (MR+T) 42-10, 
42-18, 42-28, 42-53 
West Terre Haute, Ind. (ORL) 24-20, 24-24, 24-29 
West Thompson Lake, Conn. (NED) 1-22, 1-31, 
1-52 
West Union, W. Va. (ORH) 25-22 
West Warren, Mass. (NED) 1-22, 1-44. 1-49 
Westchester Creek, N.Y. (NAN) 2-15, 2-25, 2-31, 
2-38 
Westcott Cove, Conn. (NED) 1-40 
Westerly, R.I. (NED) 1-44 
Western Branch, Va. (NAO) 5-20 
Westfield, Mass. (NED) 1-45 
Westhaven Cove Small Boat Basin (Westport 
Marina), Wash. (NPS) 38-25 
Westland District Improvement Co., Oreg. (NPP) 
37-41 
Weston, Vt. (NED) 1-22, 1-44, 1-49 
Weston Mills, Olean, N.Y. (ORP) 26-22 
Weston Mills, Portville, N.Y. (ORP) 26-22 
Westport, Conn. (NED) 1-45 
Westport, Ky. (ORL) 24-22, 24-25 
Westport District, Oreg. (NPP) 37-41 
Westport Harbor and Saugatuck River, Conn. (NED) 
1-40, 1-45 
I-51

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Westport River, Mass. (NED) 1-40 
Westport Slough, Oreg. (NPP) 37-39, 37-44 
Westville Lake, Mass. (NED) 1-22, 1-32, 1-52 
Wethersfield, Conn. (NED) 1-22 
Weymouth Back River, Mass. (NED) 1-40 
Weymouth-Braintree, Mass. (NED) 1-22 
Weymouth-Fore - Town Rivers, Mass. (NED) 
1-40, 1-53 
Wheeler Creek, Tex. (SWF) 16-22 
Wheeler, General Joe, Lock and Dam, Ala. (ORN) 
23-17 
Wheeling; W. Va. (ORP) 26-22, 26-26 
Wheeling, W. Va. (North Wheeling) (ORP) 26-22, 
26-27 
Wheeling, W. Va. (Wheeling Island) (ORP) 26-22, 
26-27 
White Lake Harbor, Mich. (NCE) 31-25, 31-44, 
31-56 
White Oak Bayou, Tex. (SWG) 15-11 
White Oak Creek, Ohio (ORH) 25-21 
White Oak Dike, Bladen and Pender Counties, N.C. 
(SAW) 6-27 
White Oak River, N.C. (SAW) 6-29 
White River, Ark. (above Peach Orchard BluTf) 
(SWL) 18-16 
White River, Ark. (below Newport) (LMM) 13-5 
White River, Ind. (ORL) 24-19, 24-30 
White River at Highway 14, 1/4 mile east of Oil 
Trough, Ark. (SWL) 18-17 
White River Backwater Levees (MR+T) 42-9 
White River Bank Stabilization, Batesville, Ark. 
(SWL) 18-7, 18-13, 18-25 
White River Basin (Little Rock District), Ark. and 
Mo. (SWL) 18-7, 18-13, 18-15, 18-24 
White River, Jacksonport, Ark. (SWL) 18-8, 18-13 
Whitebird Creek, Idaho (NPW) 38-15, 39-16 
Whitefish Point, Mich. (NCE) 31-61, 31-62 
Whitesburg, Ky. (ORL) 24-30 
Whitewater River, Ind. (ORL) 24-30 
Whitewater River Basin, Calif. (SPL) 33-20 
Whiting, Maine (NED) 1-22 
Whitings Creek, Va. (NAO) 5-24 
Whitlow Ranch Dam, Ariz. (SPL) 33-5, 33-11, 
33-16 
Whitmanville Lake, Mass. (NED) 1-44, 1-51 
Whitney Lake, Tex. (SWF) 16-14, 16-17, 16-21 
Whitney Point Lake, N.Y. (NAB) 4-16, 4-26 
Whitney Point Village, N.Y. (NAB) 4-16, 4-26 
Whittier, Alaska (NPA) 40-15 
Wichita arid Valley Center Channel Improvement, 
Kans. (SWT) 19-16, 19-17, 19-18 
Wickford Harbor, R.I. (NED) 1-40 
Wicomico River, Md. (NAB) 4-10, 4-24, 4-31 
Wiedmer Chemical Drainage and Levee District, Mo. 
(LMS) 14-15 
Wilcox, Pa. (ORP) 26-23 
Wild Rice and Marsh Rivers, Minn. (NCS) 27-27 
Wild Rice River, Minn. (NCS) 27-28 
Wild Rice River, Mahnomen Co., Minn. (NCS) 
27-17, 27-21 
Wild Rice River, South Branch and Felton Ditch, 
Minn. 27-24 
Wildcat and San Pablo Creeks, Calif. (SPK) 35-17, 
35-25 
Wilders, Ky. (ORL) 24-24 
Wiley Creek Lake, Oreg. (NPP) 37-44 
Wilkes-Barre, Hanover Township, Pa. (NAB) 4-36, 
4-39 
Willamette Falls Fishladder, Oreg. (NPP) 37-44 
Willamette River above Portland and Yamhill River, 
Oreg. (NPP) 37-39 
Willamette River at Willamette Falls, Oreg. (NPP) 
37-10, 37-26, 37-35, 37-45 
Willamette River Basin, Oreg. (NPP) 37-16, 37-37, 
37-42, 37-49, 37-50 
Willamette River Basin, Oreg.-Bank Protection 
(NPP) 37-17, 37-27, 37-37, 37-50 
Willamette River Basin Channel Clearing and 
Snagging (NPP) 37-42 
Willapa River and Harbor and Naselle River, Wash. 
(NPS) 38-7, 38-16, 38-22 
Willapa River at Raymond, Wash. (NPS) 38-29 
Willard Beach, South Portland, Me. (NED) 1-42 
William H. Harsha Lake, Ohio (ORL) 24-12, 24-17, 
24-27 
William L. Springer Lake, Ill. (NCR) 28-16 
Williamson, W. Va. (ORH) 25-20, 25-22 
Williamsport, Pa. (NAB) 4-36, 4-39 
Williamstown, W. Va. (ORH) 25-21 
Williamsville Reservoir, Vt. (NED) 1-45 
Williston, N.D., Water Intake (MRO) 21-18 
Willoughby Channel, Va. (NAO) 5-24 
Willow Creek Lake, Heppner, Oreg. (NPP) 37-17, 
37-28, 37-37 
Willow Creek Lake, Heppner, Oreg. (NPW) 39-15 
Willow Island Locks and Dam, W. Va. (ORD) 22-3, 
22-7 
Wilmington Harbor, Del. (NAP) 3-8, 3-10, 3-16, 
3-20 
Wilmington Harbor, N.C. (SAW) 6-9, 6-19, 6-29 
Wilmore, Pa. (ORP) 26-22 
Wilson Branch, Cheraw, S.C. (SAN) 7-8 
Wilson Creek, Sumter County, S.C. (SAN) 7-16 
Wilson Harbor, N.Y. (NCB) 32-11, 32-21, 32-33 
Wilson Lake, Kans. (MRK) 20-7, 20-12, 20-16, 
20-19 
Wilson Lock and Dam, Ala. (ORN) 23-17 
Wilson Point Harbor, Conn. (NED) 1-40 
Wilson River, Oreg. (NPD) 37-43 
Wilton, N.H. (NED) 1-22 
Winchester Bay, Oreg. (NPP) 37-39 
Winfield Levee, Kans. (SWT) 19-16 
I-52

INDEX 
Winnibigoshish Reservoir, Minn. (NCS) 27-26 
Winnipesaukee Lake, N.H. (NED) 1-40 
Winona, Minn. (NCS) 27-17, 27-21 
Winona Harbor, Minn. (NCD) 29-7 
Winooski River, Vt. (NAN) 2-36 
Winslow (Tributaries of Little Colorado River), Ariz. 
(SPL) 33-21 
Winsted, Conn. (NED) 1-22, 1-44, 1-49 
Winter Harbor, Maine (NED) 1-40 
Winter Harbor, Va. (NAO) 5-24 
Winthrop Beach, Mass. (NED) 1-42 
Winthrop Harbor, Mass. (NED) 1-40, 1-46 
Wisconsin River, Wis. (NCS) 27-23 
Wishart Point Channel, Va. (NAO) 5-24 
Wister Lake, Okla. (SWL) (SWT) 18-22, 19-6, 
19-12, 19-14, 19-16, 19-18 
Withlacoochee River, Fla. (SAJ) 9-46 
Wolf and Jordan Rivers, Miss. (SAM) 10-42, 10-45 
Wolf-Coffee Lake, Kans. (MRK) 20-17 
Wolf Creek Dam-Lake Cumberland, Ohio River 
Basin, Ky. (ORN) 23-8, 23-10 
Wolf Creek, U.S. Highway 45 Bridge, Prentiss 
County, Miss. (SAM) 10-17, 10-29, 10-40 
Wolf Creek, Highway 362 Bridge, Prentiss County, 
Miss. (SAM) 10-43 
Wolf River (Memphis Harbor), Tenn. (LMM) 13-5 
Wood Island Harbor, Biddleford, Maine (NED) 1-40 
Wood River Drainage and Levee District, Ill. (LMS) 
14-7, 14-10, 14-12 
Woodbridge Creek, N.J. (NAN) 2-35 
Woodbury, Conn. (NED) 1-22 
Woodbury Creek, N.J. (NAP) 3-21 
Woodcock Creek Lake, Pa. (ORP) 26-11, 26-15, 
26-20, 26-27 
Woodland St. Bridge, Tenn. (ORN) 23-4 
Woodlands, W. Va. (ORP) 26-22, 26-27 
Woodmont Shore, Milford, Conn. (NED) 1-42 
Woodruff, Jim, Lock and Dam, Ga. and Fla. (SAM) 
10-23, 10-30, 10-41 
Woods Hole Channel, Mass. (NED) 1-40 
Woodson Drainage District, Oreg. (NPP) 37-41, 
37-42, 37-48 
Woonsocket, R.I. (NED) 1-22, 1-44, 1-48 
Worcester, Mass. (NED) 1-22, 1-48 
Worcester Diversion, Mass. (NED) 1-44 
Worthington, Minn. (NCR) 28-17 
Wrangell Harbor, Alaska (NPA) 40-13, 40-15 
Wrangell Narrows, Alaska (NPA) 40-13, 40-15 
Wright Patman Dam and Lake, Tex. (LMN) (SWF) 
11-17, 16-12, 16-17, 16-21 
Wright's Creek, N.C. (SAW) 6-25 
Wrightsville Beach, N.C. (SAW) 6-27 
Wrightsville Dam, Vt. (NAN) 2-36 
Wynoochee Lake, Wash. (NPS) 38-10, 38-17, 
38-23 
Wynoochee River, Wash. (NPS) 38-29 
Wyoming Valley, Pa. (NAB) 4-19, 4-20, 4-27, 
4-33 
Y 
Yadkin River Basin, N.C. - S.C. (SAW) 6-13, 6-30 
Yakima, Wash. (NPS) 38-29 
Yakima River at Union Gap, Wash. (NPS) 38-13 
Yakima River, Cle Elum, Wash. (NPS) 38-29 
Yakima River, West Richland, Wash. (NPS) (NPW) 
38-29, 39-15, 39-17 
Yakima River, Yakima, Wash. (NPS) 38-29 
Yalobusha River, Miss. (LMR) 12-15 
Yaquina Bay and Harbor, Oreg. (NPP) 37-10, 
37-26, 37-35 
Yaquina Bay and Harbor Small Boat Basin, Oreg. 
(NPP) 37-39 
Yaquina River, Oreg. (NPP) 37-39 
Yatesville Lake, Ky. (ORH) 25-10, 25-15, 25-18 
Yazoo River, Miss. (LMK) 12-3, 12-9, 12-11 
Yazoo River Backwater Area (MR+T) 42-51 
Yazoo River Basin, Miss. (MR+T) 42-7, 42-16, 
42-28, 42-46, 42-51 
Yazoo River Basin Project Levees (MR+T) 42-46, 
42-49 
Yellow Jacket Creek, Hogansville, Ga. (SAM) 10-43 
Yellowstone River, Bank Protection, Billings, Mont. 
(MRO) 21-19 
Yellowstone River, Greycliff Bridge, Mont. (MRO) 
21-19 
Yellowstone River, near Miles City, Mont., Water 
Intake and Sewage Lagoon (MRO) 21-19 
Yellowstone River, Reedpoint Bridge, Mont. (MRO) 
21-19 
Yellowstone River, Springdale Bridge, Mont. (MRO) 
21-19 
Yellowstone River, Voges Bridge, near Big Timber, 
Mont. (MRO) 21-19 
Yellowstone River, W. Glendive, Mont. (MRO) 
21-17, 21-19 
Yellowstone River, Water Plant, Livingston, Mont. 
(MRO) 21-19 
Yellowstone River, Yellowstone Co. Bridge, near 
Billings, Mont. (MRO) 21-19 
Yonkers, N.Y. (NAN) 2-36 
Yonkers, Nepera Park, N.Y. (NAN) 2-39 
York Harbor, Maine (NED) 1-40, 1-53 
York, Indian Rock Dam, Pa. (NAB) 4-19, 4-27, 
4-33 
York River, Va. (NAO) 5-9, 5-16, 5-21 
York Spit Channel, Va. (NAO) 5-2, 5-18 
Youghiogheny River, Pa. and Md. (ORP) 26-21 
Youghiogheny River Lake, Pa. and Md. (ORP) 
26-11, 26-15, 26-20, 26-27 
Youngs and Klaskanine River, Oreg. (NPP) 37-39 
I-53

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1987 
Youngs Bay and Youngs River, Oreg. (NPP) 37-39, 
37-45 
Youngs River Dikes, Oreg. (NPP) 37-41 
Youngstown, Ohio (ORP) 26-22 
Z 
Zacate Creek Channel Improvement, Tex. (SWF) 
16-22 
Zanesville, Ohio (ORH) 25-21 
Zintel Canyon Dam, Wash. (NPW) 39-8 
Zippel Bay, Lake of the Woods County, Minn. (NCS) 
27-3, 27-19 
Zippel Bay Harbor, Minn. (NCS) 27-23 
Zumbro River, Minn. (NCS) 27-24 
I-54 1-54S .GOVERNIMNT PRINTING OrrICEC g989g62o 634:OO953

APR 1
